Loading...
2019-12-03 City Council Agenda Packet Page 1 of 8 California Public Records Act ("PRA"): In compliance with the PRA, the documents pertaining to agenda items, including attachments, which are presented to the City Council in open session are available for public inspection. They may be inspected during regular business hours in the Office of the City Clerk at Vernon City Hall, 4305 Santa Fe Avenue; Vernon, California 90058, no appointment necessary, and on the City’s website at www.cityofvernon.org. Americans with Disabilities Act (“ADA”): In compliance with the ADA, if you need special assistance to participate in the meeting, please contact the Office of the City Clerk at (323) 583-8811. Notification of at least 48 hours prior to the meeting or time when services are needed will assist the City staff in assuring that reasonable arrangements can be made to provide accessibility to the meeting or service. Agenda City of Vernon Regular City Council Meeting Tuesday, December 03, 2019, 09:00 AM City Hall, Council Chamber 4305 Santa Fe Avenue Vernon, California Melissa Ybarra, Mayor Leticia Lopez, Mayor Pro-Tem William Davis, Council Member Carol Menke, Council Member Diana Gonzales, Council Member CALL TO ORDER & FLAG SALUTE CHANGES TO THE AGENDA PUBLIC COMMENT At this time the public is encouraged to address the City Council on any matter that is within the subject matter jurisdiction of the City Council. The public will also be given a chance to comment on matters which are on the posted agenda during City Council deliberation on those specific matters. PRESENTATION 1. Human Resources Recognition of Retired Employee - Craig Peltier, Fire Battalion Chief Recommendation: A. Acknowledge and present a proclamation to retired employee Craig Peltier, Fire Battalion Chief, in recognition of his dedicated service to the City of Vernon. 1. Craig Peltier Proclamation Regular City Council Meeting Agenda December 03, 2019 Page 2 of 8 2. Human Resources Recognition of Retiring Employee - Ana E. Quinones, Police Officer Recommendation: A. Acknowledge and present a proclamation to retiring employee Ana E. Quinones, Police Officer, in recognition of her dedicated service to the City of Vernon. 1. Ana E. Quinones Proclamation CONSENT CALENDAR All matters listed on the Consent Calendar are to be approved with one motion. Items may be removed from the Consent Calendar by any member of the Council. Those items removed will be considered immediately after the Consent Calendar. 3. Police Department Vernon Police Department Activity Log and Statistical Summary for the period of October 16 through October 31, 2019 Recommendation: A. Receive and file. 1. Police Department Activity Report - 10/16/19 to 10/31/19 4. Public Works Public Works Department October 2019 Monthly Building Report Recommendation: A. Receive and file. 1. October 2019 Building Report 5. Public Works Acceptance of Electrical Easement at 4224 District Blvd. (APN 6304-027-025) Recommendation: A. Find that the acceptance of the Electrical Easement proposed in this staff report is not a “project” as that term is defined under the California Environmental Quality Act (CEQA) Guidelines Section 15378, and even if it were a project, it would be categorically exempt in accordance with CEQA Guidelines Sections 15301 (maintenance, repair or minor alteration of an existing facility and involves negligible or no expansion of an existing use) and 15061(b)(3) (general rule that CEQA only applies to projects that may have a significant effect on the environment); and B. Accept the Electrical Easement and authorize the Mayor to execute the Certificate of Acceptance. 1. Electrical Easement - 4224 District Blvd. 2. Certificate of Acceptance - EE 4224 District Regular City Council Meeting Agenda December 03, 2019 Page 3 of 8 6. Public Utilities Second Amendment to the Memorandum of Understanding for the Purposes of the National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit Requirements Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act ("CEQA") review, because it is an administrative and governmental fiscal activity which does not involve any commitment to any specific project and that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378. Furthermore, even if the proposed action were subject to CEQA review, the action is exempt in accordance with CEQA Guidelines § 15061(b)(3), the general rule that CEQA only applies to activities that may have a significant effect on the environment, for the reason that any construction that may occur in the future relying on this approval would be- and has been- subject to CEQA review at that time; B. Approve the Second Amendment to the Memorandum of Understanding (“MOU”) between the Los Angeles Gateway Regional Water Management Joint Powers Authority (“GWMA”) and the Cities of Bell, Bell Gardens, Commerce, Cudahy, Huntington Park, Maywood, Vernon and the Los Angeles County Flood Control District (“FCD”), (hereinafter collectively referred to as the “Watershed Permittees”) for an extension to the term of the MOU to update and continue implementing a Watershed Management Program (“WMP”) and Coordinated Integrated Monitoring Program (“CIMP”) as required by the Regional Water Quality Control Board, Los Angeles Region (“Regional Board”), National Pollutant Discharge Elimination System (“NPDES”) Municipal Separate Storm Sewer System (“MS4”) Permit Order No. R4-2012-0175 (hereinafter referred to as the “Second Amendment to the MOU”); and C. Authorize the City Administrator to execute the Second Amendment to the MOU with GWMA. 1. Second Amendment to the Memorandum of Understanding with GWMA 7. Public Utilities Amendment No. 1 to the Services Agreement with CH2M Hill Engineers, Inc., for Environmental Support Services Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act (“CEQA”) review, because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines section 15378; B. Approve Amendment No. 1 to the Services Agreement ("Agreement") with CH2M Hill Engineers, Inc., in substantially the same form as submitted, to amend Exhibit C of the Agreement to accurately reflect the amount and allocation of funding needed to support the City with its environmental compliance needs during the remaining phases of the contract, with no increase in the total not-to-exceed contract amount; and C. Authorize the City Administrator to execute the Amendment No. 1 to the Agreement with CH2M Hill Engineers, Inc. with an effective date of December 3, 2019. 1. Amendment No. 1 with CH2M Hill Engineers, Inc. Regular City Council Meeting Agenda December 03, 2019 Page 4 of 8 8. Fire Department Ratify the Execution of an Agreement to Accept Ownership of 12 Vehicles from Kia Motors America, Inc. for Vehicle Extrication Training Recommendation: A. Find that approval of the proposed donation is exempt under the California Environmental Quality Act (“CEQA”) review, because it is a government fiscal activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines section 15378; and B. Ratify execution of the Donation Acceptance Form and the Agreement, in substantially the same form as submitted, with Kia Motors America, Inc. for the donation of 12 new vehicles. 1. Kia Motors America, Inc. - Donation Acceptance Form and Agreement to Accept Ownership of Vehicles 9. City Attorney Approval of Amendment No. 1 to the Attorney Services Agreement (Litigation) Between the City of Vernon and Burke, Williams & Sorensen, LLP for Specialized Outside Legal Services Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act (“CEQA”) review, because it is a continuing administrative and fiscal activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines section 15378; B. Approve Amendment No. 1 to the Attorney Services Agreement (Litigation) with Burke, Williams & Sorensen, LLP (“Burke Williams”), in substantially the same form as submitted, to increase the total not-to-exceed amount by an additional $150,000.00; and C. Authorize the City Administrator to execute Amendment No. 1 to the Attorney Services Agreement (Litigation) with Burke Williams with an effective date of December 3, 2019. 1. Amendment No. 1 - Burke, Williams and Sorensen 10. Health and Environmental Control Department Award of a Services Agreement to Industrial Environmental Association (IEA) to provide Environmental Compliance, Outreach, Training, and Education Services Recommendation: A. Find that approval of the proposed action is exempt under the California Environmental Quality Act (CEQA), because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378; B. Approve the Services Agreement with Industrial Environmental Association (IEA), in substantially the same form as submitted, to provide environmental compliance outreach, training, and education services for a period of three years and an amount not-to-exceed $150,000; and C. Authorize the City Administrator to execute the proposed Services Agreement with IEA with an effective date of December 1, 2019. 1. Services Agreement with Industrial Environmental Association Regular City Council Meeting Agenda December 03, 2019 Page 5 of 8 11. City Administration Council Conference Attendance Report Recommendation: A. Find that receiving this Council Conference Attendance Report is exempt from California Environmental Quality Act ("CEQA") review, because it is an administrative activity of government that will not result in direct or indirect physical changes in the environment and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378; and B. Receive and file. 12. Finance/ Treasury Approval of RDA Obligation Retirement Account Warrant Register No. 56 Covering the Period of November 12 through November 25, 2019 Recommendation: A. Approve RDA Obligation Retirement Account Warrant Register No. 56 which totals $2,702.30 and consists of the following: 1) Ratification of electronic payments totaling $2,702.30. 1. RDA Obligation Retirement Account Warrant Register No. 56 13. Finance/ Treasury Approval of Operating Account Warrant Register No. 35 Covering the Period of November 12 through November 25, 2019 Recommendation: A. Approve Operating Account Warrant Register No. 35 which totals $11,102,930.59 and consists of the following: 1) Ratification of electronic payments totaling $10,715,256.02. 2) Ratification of the issuance of early checks totaling $344,781.87. 3) Authorization to issue pending checks totaling $42,892.70. 1. Operating Account Warrant Register No. 35 Regular City Council Meeting Agenda December 03, 2019 Page 6 of 8 NEW BUSINESS 14. City Clerk April 14, 2020 General Municipal Election Recommendation: A. Find that this action is exempt from the California Environmental Quality Act (CEQA) review, because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines Section 15378; B. Adopt a Resolution calling and giving notice of an all-mail ballot General Municipal Election to be held on Tuesday, April 14, 2020 for the election of a City Council Member as required by the provisions of the Charter of the City of Vernon and submitting a ballot measure to amend the Charter related to Mayoral rotation and a ballot measure levying a transactions and use tax to the voters at said election; C. Determine authors of arguments and rebuttals; D. Adopt a Resolution requesting the Board of Supervisors of the County of Los Angeles to render specified services to the City relating the conduct of the General Municipal Election to be held on Tuesday, April 14, 2020; and E. Direct the City Clerk to transmit a copy of the measures to the city attorney for preparation of impartial analyses. 1. Resolution Calling Election 2. Resolution No. 2014-64 regarding Candidate Statements 3. Resolution Requesting County Services 15. City Administration Resolution Appointing Tilahun (Abraham) Alemu to Serve as General Manager of Public Utilities and Approving and Authorizing the Execution of a Related At-Will Employment Agreement Recommendation: A. Find that approval of the proposed actions are exempt from California Environmental Quality Act (CEQA) review, because they are administrative activities that will not result in direct or indirect physical changes in the environment, and therefore do not constitute a "project" as defined by CEQA Guidelines section 15378; and B. Adopt a resolution appointing Tilahun Alemu to Serve as General Manager of Public Utilities for the City of Vernon effective December 3, 2019, and approving and authorizing the execution of a related at-will employment agreement. 1. Resolution Appointing Tilahun (Abraham) Alemu to Serve as General Manager of Public Utilities Regular City Council Meeting Agenda December 03, 2019 Page 7 of 8 16. Public Utilities Access and License Agreement with the Water Replenishment District of Southern California Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act (CEQA) review because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines § 15378. Furthermore, even if the proposed action were subject to CEQA review, the action is exempt in accordance with CEQA Guidelines § 15061(b)(3), the general rule that CEQA only applies to activities that may have a significant effect on the environment, for the reason that any construction that may occur in the future relying on this approval would be- and has been- subject to CEQA review at that time and the Department of Toxic Substances Control (DTSC) would be- and has been- the lead agency; B. Approve an Access and License Agreement with the Water Replenishment District of Southern California, in substantially the same form as submitted, in the amount of twenty-seven thousand dollars ($27,000) per year and adjusted annually based upon increases in the Consumer Price Index; and C. Authorize the City Administrator to execute the Access and License Agreement for an initial term of twenty years, with an option to extend the term for four additional five-year terms. 1. Access and License Agreement with Water Replenishment District ORAL REPORTS City Administrator Reports – brief reports on activities and other brief announcements by the City Administrator. City Council Reports – brief AB1234 reports, or report on: activities, announcements, or directives to staff. CLOSED SESSION 17. CONFERENCE WITH LEGAL COUNSEL – EXISTING LITIGATION (4 cases) Government Code Section 54956.9(d)(1) Bicent (California) Malburg LLC et al. v. City of Vernon et al., Los Angeles Superior Court Case No. 19STCV08859 and JAMS Reference No. 1100107175 City of Vernon v. Bicent (California) Malburg LLC Los Angeles Superior Court Case No. 19STCP02411 and JAMS Reference No. 1220062657 City of Vernon v. Dennis Roberts, et al., Los Angeles Superior Court Case No. 19NWUD02332 Torres et al. v. City of Vernon et al., Court of Appeal Case No. B288558; Los Angeles Superior Court Case No. BC620265 Regular City Council Meeting Agenda December 03, 2019 Page 8 of 8 18. CONFERENCE WITH LABOR NEGOTIATORS Government Code Section 54957.6 Agency Designated Representative: Carlos Fandino, City Administrator Employee Organizations: Vernon Professional Firefighters Association, and Vernon Fire Management Association 19. CONFERENCE WITH LEGAL COUNSEL – ANTICIPATED LITIGATION Significant Exposure to Litigation Government Code Section 54956.9(d)(2) Number of potential cases: 2 Facts and Circumstances: Pursuant to Government Code Section 54956.9(e)(3), the City has received notice that the Vernon Professional Firefighters Association has filed an Unfair Practice Charge related to the City’s decision to contract with the Los Angeles County Fire Protection District for fire protection and related coverage services during the transition period; the City has not yet received confirmation of this filing from the Public Employment Relations Board. Facts and Circumstances: Pursuant to Government Code Section 54956.9(e)(3), the City has received written communication threatening litigation on behalf of the Vernon Fire Management Association, which communication is made available for public inspection pursuant to Section 54957.5. ADJOURNMENT I hereby certify under penalty of perjury under the laws of the State of California, that the foregoing agenda was posted on the bulletin board at the main entrance of the City of Vernon City Hall, located at 4305 Santa Fe Avenue, Vernon, California, and on the City’s website, not less than 72 hours prior to the meeting set forth on this agenda. Dated this 27th day of November 2019. By: __________________________________ Lisa Pope, City Clerk. City Council Agenda Item Report Agenda Item No. COV-499-2019 Submitted by: Lisette Grizzelle Submitting Department: Human Resources Meeting Date: December 3, 2019 SUBJECT Recognition of Retired Employee - Craig Peltier, Fire Battalion Chief Recommendation: A. Acknowledge and present a proclamation to retired employee Craig Peltier, Fire Battalion Chief, in recognition of his dedicated service to the City of Vernon. Background: Historically, the City Council has issued proclamations in honor of retiring City employees. Craig Peltier, Fire Battalion Chief, retired from the City of Vernon on November 9, 2019 after providing over thirty-one (31) years of service to the City. During his career with the City of Vernon Craig Peltier held the following positions: Hired as a Firefighter effective October 24, 1988, promoted Fire Captain effective February 2, 2009, serving as the Administrative Captain and Training Captain and promoted to Fire Battalion Chief effective December 11, 2018. Battalion Chief Peltier completed Hazardous Materials and Urban Search & Rescue training to become a State Certified Hazardous Materials and US&R Specialist. Battalion Chief Peltier also completed the following State certifications: Company Officer, Chief Officer, Task Force Leader, and Strike Team Leader. Battalion Chief Peltier served within many critical areas that required diligent leadership skills. As a Battalion Chief, he managed B-Platoon personnel, State and Federal Grants, Communications, Personnel Protective Equipment, Wildland Training, Incident Command System Training, California Incident Command Certification System, and Facilities. During Battalion Chief Peltier’s career, he has been very involved with project management and leadership. Below are examples of the many activities he was involved in during his distinguished career. •Managed the transition of dispatch services from Vernon PD to the Downey Communications Center •Managed the Department's Personnel Protective Equipment and Clean Cab Air policy •Managed the Department's Fuels storage and consumption program •Managed the Department’s Civil Defense generator program •Member of the Department’s Apparatus Committee that researched and designed all front-line apparatus •Managed the transition of dispatch services from the Downey Communications Center to the Verdugo Fire Communications Center •Managed the transition of dispatch services from the Verdugo Fire Communications Center to the Los Angeles County Fire Communications Center •Member of the Area E/F CICCS Committee •Member of the Area E Communications Committee •Member of the Verdugo Task Force Committee •Member of the LA RICS RFP Selection Committee The above noted items are just a snapshot of Battalion Chief Peltier’s commitment of service to the City, the personnel of the Fire Department, and community in which he served. Fire Battalion Chief Peltier's work ethic and dedication to the City of Vernon, co-workers, supervisors, management and members of the public have made him a valued member to the Fire Department. Fire Battalion Chief Peltier was a dedicated employee to the City of Vernon and exemplified true public service to our community and he will truly be missed. Fire Battalion Chief Peltier was hired on October 24, 1988 and meets the eligibility requirements under CalPERS to retire from the City of Vernon effective November 9, 2019. Fiscal Impact: There is no additional fiscal impact on the current operating budget as a result of this recommended action. ATTACHMENTS 1. Craig Peltier Proclamation tl~ ~~ ~,~ ~ ~, •'`" 1 r ~ ~ ~~ ~ R F g` A PROCZ~IMATION OF THE MAYOR ANl~ THE CITY COUNCIL OF THE CITY OF VERNON COMMENDING CRAIG PELTIER FOR HIS M~91 NY YEARS OF SER VICE TO THE CITY OF VERNON WlH ~ ~~S, CrUig Peltier ha~~ been employed by the City of Tlernon ~~ince October 24, 7988, cznd has faithfully ~'erved the City of ~ Tlernon for over 3 7 years; and I~VHFRF~S, Craig Peltier has retired from the City of Vernon effective November 9, 2079, as a .Fire Battalion Chief,• ~zn~l 1.YIHF ~.~5, during the course of his employment with the City of Tlernon, Craig Peltier held the po~~ition~~ of Firefighter, .Fire Captain, administrative Captain, Training Captain and .Fire .Battalion Chief,• cznd I,VH..:RF..~S, Craig Peltier completed Hu~ardou~~ Materials and Urban- Search' ~' Rescue training to become a State Certified .Hatiardou~~ M~teri~l~~ cznd USSR Specialist, end obtained State certifications u~- Company O~cer, T. as1~ Force Leader, and Stri,~e T. eum Leader; ~znd I~HF :~S, during hip- tenure as Fire Battalion Chief, Craig Peltier managed B-Platoon per~~onnel, State and Federal Grants, Communication~~, Per~~onnel Protective F.guipment, I~ildland Truinin~ Incident Command System Trczinin~ Cczliforni~ Incident Command Certification Sy~~tem, and Faczlitie~~; and I~HERF.~.S, during hip' career, Craig Peltier managed the transition of ~di~patch ~~ervice~~, from the l~ernon Police Department to the Downey Communication~~ Center, managed the Department's 1'er~~onnel Protective Fguipment and Clean Cab fir policy, managed the Department's .Fuels storage and con~-umption program, managed the Department ~- Civil Defense generator program, managed the tran~'ition of di~putch ~-ervices from the Downey Communication~~ Center to the 1~erdugo .Fire Communication~~ Center, managed the transition of ~di~patch ~-err~ice~~ from the Tlerdu~o .Fire Communication~~ Center to the Lo~~.~ngele~~ County .Fire Communications Center, cznd ~~err~ed a~~ a member of the Department's ~pparcztus Committee that re~~earched and de~~igned all front-line app~ratuf, ~.rea F/.F CICCS Committee, area F Communicution~~ Committee, Verd~~o Ta~~1~ .Force Committee and the L,~ RICS RFI' Selection Committee; and I,YIHF:RE~S, durzna hi~~ long cznd di~~tinguished career with the City of Vernon, Craig Peltier has Avon the deepe~~t respect of~hi~~ colleagues through hi~~ leader~~hip and hi~~ many contribution~~ to the City; end I~HF REAS, it i~- czn honor to express our ~ppreczation to Craig Peltier for his exemplary service to the City of L'ernon Und ~vi~~h Craiggood health upon his retirement and for continued ~~ucces~~ in life ~~ pur~-uit~~; and ICI-.CF.R~:~S, the Mayor crud the City Council of the City of Tlernon, on behalf of'it~~ employee-, resident~~ and ~usines~~e~-, wish to commend c~nd thUnl~ Craig Peltier for hip- manyyears of ~~ervice to the City and invite recognition of his contribution~~ cznd achievement-. NO Imo, THE CFO ~, T1=I ~ MAYOR .AND T. I IF. CIT. Y CO UNCIL O.F T. HF CITY O.F ~RNON; ON B ~H~I~F OF IT. S FMPLOYFFS, KFSIDEIVT. S ~D .BUSZNFSS :S H : ~BY COMMEND CRAIG PFLTIFR .FOR I fIS ~~NY YF.~RS O.F S :RVICF_ TO TN ~ CITY. T. I CIS 1'ROCL.~~,?VI~TIOIV IS .B :ING 1' :SENTFD TO CRAIG PF_LT. IF.R BY THF..HO.N~OR~B ~ MAYOR M ~LISS~ YB~RK~ .FOR .AND ON BFN~L,.F O.F THE CIT. Y CO UIV ~CIL O.F TH : CITY O.~ ~RNON THIS 31~~' DAY O.F D ~C ~MBFR TI,Y~O TIHOUS~ND ~~ID NZi~FTF ~~V. • ~ s ~~/ City Council Agenda Item Report Agenda Item No. COV-14-2019 Submitted by: Lisette Grizzelle Submitting Department: Human Resources Meeting Date: December 3, 2019 SUBJECT Recognition of Retiring Employee - Ana E. Quinones, Police Officer Recommendation: A. Acknowledge and present a proclamation to retiring employee Ana E. Quinones, Police Officer, in recognition of her dedicated service to the City of Vernon. Background: Historically, the City Council has issued proclamations in honor of retiring City employees. Ana E. Quinones, Police Officer, will be retiring from the City of Vernon on December 20, 2019, after providing over twenty-one (21) years of service to the City. During her career with the City of Vernon, Police Officer Quinones held the following positions: Hired as a Vernon Service Officer on November 16, 1998 and promoted to Police Officer, effective July 19, 1999, Sworn as a Police Officer effective December 13, 1999. Police Officer Quinones completed the following training and courses: 2,668 hours including Arrest and Control, Tactical Communications, Advanced Firearms and Rifle Courses, Commercial Enforcement, Community Policing, Field Training Program, Criminal Investigations, and Interview and Interrogations. During her career Police Officer Quinones earned the following certifications: Basic POST, Intermediate POST, and Advanced POST. Officer Quinones served the Vernon Police department in various capacities including the following: -Patrol Officer -Field Training Officer -Industrial Relations -Honor Guard -Detective Bureau During her over 21 year career with the City of Vernon, Police Officer Quinones was a dedicated employee and is well respected by her co-workers. She served the community in an exemplary manner. Police Officer Quinones was hired on November 16, 1998, and meets the eligibility requirements under CalPERS to retire from the City of Vernon effective December 20, 2019. Fiscal Impact: There is no additional fiscal impact on the current operating budget as a result of this recommended action. ATTACHMENTS 1. Ana E. Quinones Proclamation ~. O _. r G 4 ~ ;k~~ ,S'' 4 A PROCZ~~MATION OF 7"HE MAYOR AND THE CI~"Y COUNCIL OF THE CITY OF VERNON COMMENDING ANA E. QUINONES FOR HER MANY YEARS OF SER VICE TO THE CITY OF VERNON I-YIHERE~S, Ana F.. ~uinone~~ (`~na ~uinonec') ha.~~ been employed by the City of T%rnon .+~ince November 7 6, 7 998, and hay f with f ully ~ erred the City of Vernon f or over 2 7 ye~zr~~ and I~HF.RF.~S, Ana ~uinones will retire from the City of Vernon effective December 20, 20 ~9, a.►- a Police Officer; and 1,YI.LHERFAS, during the tour.+~e of ~ h.er employment with the City of ~ Vernon, Ana ~uinone~~ h.eld the ~osition~~ of TJernon Service O f fiver and Police O fficer; end, . UCH ~1~E~S, Ana (~uinones completed 2,668 hour• of training throughout her career which included ~rre~~t and Control, T. actic•~zl Communication~~, ~dvanc:ed .Firearm~~ and Rifle Cour.~~es, Commercial Enforcement, Community 1'oliczng, .Field Training Program, Criminal Inve~~tigation~; and Interview ~znd Interrogations; and I,YIHE ~~5, during h.er career, ~n~z ~uinone~~, earned certification- in Ba~~ic• POST. , Intermediate 1'OS'T, and advanced POST; and I~HF JAS, Ana Ouinone~~ also ~~erved the Vernon Police Department in variou.►~ capacztie~- ~-uch as Patrol Officer, .Field T. raining Of fiver, Indu.+-trial Relation~~, Honor Guard and Detective .Bureau; and I~HE.RE.~.S, during h.er long and di~~tingui~•hed career with the City of ~ T/ernon, Ana ~uinone~~ ha.~~ zvon the deepej-t re.►pect of ~ h.er colleagues through h.er leadership and her many contribution~~ to the City; and I~IVHEKEAS, it i~~ an h.onor to ea~re~~~- our appreciation to ~n~ ~uinone.~~ f or h.er exemplary service to the City of Tlernon and ~i~~h Ana good health upon h.er retirement ~znd for continued .►~ucce.~-.~~ in life'.~~ pur.~~uit.+~; and I~HERF~S, the Mayor and the City Council of the City of Vernon, on be h.alf of its- employees, re.+~ident.+~ and bu~~ine.~~se~, u~i.~~h to commend and th. anl~ ~n~z~uinones for h.er manyyears of ~~~ervice to the City and invite recognition of her contribution.►- and achievement.+~. NO I-YI TFIERE.FOKE, TC IE ~YOR ~D TIHE CITY CO U~1 CIL O.F THE CITY O_F VF.RNON; ON .BE.H~.I~F O.~ ITS EMPLOYEES, KESIDENT. S ~1V~D BUSINESSES HEREBY COMMENDS ~1V~ E. ~UINONFS .FOR H ~R NINNY YEARS O.~ SEI~VICE T. O T.HE CIT. Y. THIS PROC'L.~~.,M~TION IS .BEING 1'R~SE~ITED TO ~1A E. ~UINONES BY THE .I CO~IOR~BL.~ MAYOR M ~LISS~ YB.~RR~ .FOR ~IVD OI~1 B J.H~LF O.~ THE CITY CO UNCIL O F THE CITY OF VFRNON THIS 3~ DAY O F DFCEMBF.R T IRO THOUSAND AND I~1IN : T ::N: CITY OF VEI~NON By: M ~ L.ISS~ YB~ ,1Vlayor City Council Agenda Item Report Agenda Item No. COV-494-2019 Submitted by: Danita Robertson Submitting Department: Police Department Meeting Date: December 3, 2019 SUBJECT Vernon Police Department Activity Log and Statistical Summary for the period of October 16 through October 31, 2019 Recommendation: A. Receive and file. Background: The Vernon Police Department's activity report consists of activity during the specified reporting period, including a summary of calls for service, and statistical information regarding arrests, traffic collisions, stored and impounded vehicles, recovered stolen vehicles, the number of citations issued, and the number of reports filed. Fiscal Impact: None. ATTACHMENTS 1. Police Department Activity Report - 10/16/19 to 10/31/19 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/16/201910/16/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191021575S ALAMEDA // 38TH, VERNONDPTAST01:28:2310/16/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191689 CA0197300VPDLUCAS,JASON*25W02:23:0101:28:23VPDLANDA,RAFAEL32E02:10:3201:31:07VPDHERRERA,GUSTAVOS602:12:3301:36:19201910216003200 E SLAUSON AV, VERNON901TPOPCORNOPOLIS08:23:2110/16/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191690 CA0197300VPDSTEVENSON,KENT,JR*4108:24:53 08:25:3208:55:4008:29:28201910216022322 E 37TH, VERNONGTARSWEETNER PRODUCTS08:54:2610/16/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191691 CA0197300VPDSWINFORD,PHILLIP/MADRIGAL,ALFONSO*43W08:57:0309:34:4409:02:3320191021605DOWNEY RD // VERNON, VERNON902TMARIA TEMORES09:39:4710/16/2019ASSTRPTDepartmentOCA NumberRMS JurisVPD CR20191694 CA0197300VPDZOZAYA,OSCAR/MANNINO,NICHOLAS*32E09:58:5309:42:57VPDRECORDS BUREAURECD16:52:5916:36:52201910216145610 ALCOA AV, VERNON45911:14:0110/16/20191015RPTDepartmentOCA NumberRMS JurisVPD CR20191692 CA0197300VPDSWINFORD,PHILLIP/MADRIGAL,ALFONSO*43W11:14:18 11:14:4313:08:2111:20:21VPDZOZAYA,OSCAR/MANNINO,NICHOLAS32E12:53:43 14:47:4411:22:00VPDDOCHERTY,MICHAEL/STEVENSON,KENT,JR4111:14:5112:52:4711:21:37VPDGAYTAN,LORENZO5D3113:18:4711:56:44VPDOURIQUE,CARLOSMET111:51:5712:52:5712:08:44VPDCHAVEZ,JERRY,JRS111:37:2412:31:0211:43:17VPDMARTINEZ,GABRIELS513:04:3211:21:581Page of 210/17/201905:15:35 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/16/201910/16/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910216175111 HAMPTON, VERNON484RPEREZ SEWING13:11:4010/16/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191693 CA0197300VPDSTEVENSON,KENT,JR*4113:13:0413:13:54VPDSWINFORD,PHILLIP/MADRIGAL,ALFONSO43W13:13:3813:53:0813:19:01201910216456326 PINE AVE, BELLWARRANTBELL PD22:42:4710/16/20191015RPTVPDLANDA,RAFAEL*32W22:44:47 22:44:4823:50:2423:10:44* Denotes Primary Unit2Page of 210/17/201905:15:35 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/17/201910/17/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910216634900 FRUITLAND AV, VERNON902TESCOBAR08:05:1810/17/2019RPTORDepartmentOCA NumberRMS JurisVPD CR20191695 CA0197300VPDDOCHERTY,MICHAEL*41E08:07:5508:08:23 09:21:5808:26:14VPDSWINFORD,PHILLIP/MADRIGAL,ALFONSO43W08:08:2009:21:5908:15:14201910216675610 ALCOA AV, VERNONPATCK09:06:3010/17/20191015RPTDepartmentOCA NumberRMS JurisVPD CR20191696 CA0197300VPDSTEVENSON,KENT,JR/VASQUEZ,LUIS*32E09:59:1909:06:30201910216734727 E 49TH, VERNON459VRENGINEERED APPLICATIONS10:41:3710/17/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191697 CA0197300VPDDOCHERTY,MICHAEL*41E10:43:39 10:44:0311:34:3710:48:48201910216761155 W TEMPLE ST, LOS ANGELESLOCATEVIERTEL`S TOWING11:55:5410/17/2019VRECVPDRECORDS BUREAU*RECD12:17:3511:56:41201910216772360 E 48TH, VERNON484RZANKOU ENTERPRISES12:11:1110/17/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191699 CA0197300VPDVALENZUELA,FERNANDO*31W12:13:3513:30:4712:16:29201910216794725 E 50TH, VERNONREPOLAW RECOVERY12:54:1710/17/2019REPODepartmentOCA NumberRMS JurisVPD CR20191698 CA0197300VPDRECORDS BUREAU*RECD14:06:0512:57:33201910216921Page of 210/22/201919:52:31 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/17/201910/17/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910216923225 E WASHINGTON BL, VERNON901TARCADIA INC16:43:1610/17/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191702 CA0197300VPDSTEVENSON,KENT,JR/VASQUEZ,LUIS*32E16:45:56 16:46:1117:45:2116:49:00VPDDOCHERTY,MICHAEL41E16:47:0217:01:5016:50:38201910216932406 E 28TH, VERNON901TREBECCA16:53:5710/17/2019RPTORDepartmentOCA NumberRMS JurisVPD CR20191701 CA0197300VPDVALENZUELA,FERNANDO*31W16:56:0217:57:2616:58:11VPDSWINFORD,PHILLIP/MADRIGAL,ALFONSO43W17:57:2717:16:43VPDMARTINEZ,GABRIELS517:57:2716:58:05201910216952150 E 25TH, VERNONMR6017:07:5610/17/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191700 CA0197300VPDSWINFORD,PHILLIP/MADRIGAL,ALFONSO*43W17:14:3017:07:56201910216963000 E 46TH, VERNON422RVIVION17:13:0510/17/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191703 CA0197300VPDDOCHERTY,MICHAEL*41E17:15:01 17:15:2318:18:2217:19:11201910217015401 S SOTO, VERNON415NYDJ19:21:5110/17/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191704 CA0197300VPDNEWTON,TODD*41W19:24:4019:54:40VPDOURIQUE,CARLOS32E21:08:5119:51:04VPDSWINFORD,PHILLIP/CERDA,PAUL,JR4319:53:1919:27:25* Denotes Primary Unit2Page of 210/22/201919:52:31 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/18/201910/18/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910217242955 LEONIS BL, VERNON901TVERIZON WIRELESS 1-800-451-524204:56:2110/18/2019VSRPTDepartmentOCA NumberRMS JurisVPD CR20191705 CA0197300VPDVASQUEZ,LUIS*32E05:00:5405:50:4905:03:00VPDNEWTON,TODD41W05:50:4905:08:16VPDCERDA,PAUL,JR4305:35:5905:03:37VPDSANTOS,DANIELS205:48:5305:36:15USTOWUS TOW05:17:29 05:18:0805:50:5005:49:41201910217262727 E VERNON AV, VERNONREPO05:33:1910/18/2019REPORPTDepartmentOCA NumberRMS JurisVPD CR20191706 CA0197300VPDSANTOS,DANIEL*S105:33:4305:33:4120191021760S ATLANTIC BL // BANDINI BL, VERNON902TLASO EAST LA16:00:0010/18/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191707 CA0197300VPDSWINFORD,PHILLIP/MADRIGAL,ALFONSO*4316:08:03 16:08:3817:32:0616:29:16VPDVASQUEZ,LUIS32E16:50:1118:20:2117:08:11201910217645107 S DISTRICT BL, VERNON925ALKHAM HOME FASHION18:07:1910/18/2019RPTVSDepartmentOCA NumberRMS JurisVPD CR20191708 CA0197300VPD*25E18:09:47 18:09:4819:15:5718:20:11VPDVASQUEZ,LUIS/MADRIGAL,ALFONSO32E18:34:0518:20:24MR C TOWMR C TO18:39:35 18:39:3519:15:5818:49:46201910217654717 E DISTRICT BL, VERNON459ANOVA DESIGN18:21:4910/18/2019VOIDDepartmentOCA NumberRMS JurisVPD CR20191709 CA0197300VPDDOCHERTY,MICHAEL*31W18:24:31 18:24:3219:20:3518:27:05VPDCAM,PATRICK17W18:54:4419:55:5718:55:27VPDGODOY,RAYMOND25E20:33:4419:16:01VPDVASQUEZ,LUIS/MADRIGAL,ALFONSO32E18:34:0519:13:2718:35:171Page of 210/19/201900:27:28 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/18/201910/18/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910217654717 E DISTRICT BL, VERNON459ANOVA DESIGN18:21:4910/18/2019VOIDDepartmentOCA NumberRMS JurisVPD CR20191709 CA0197300VPDNEWTON,TODD4320:33:4518:47:53VPDPEREZ,NICKL220:33:4618:44:28* Denotes Primary Unit2Page of 210/19/201900:27:28 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/19/201910/19/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191021792SANTA FE // OLYMPIC, VERNONTRAFFIC STOP01:54:2010/19/20191015RPTDepartmentOCA NumberRMS JurisVPD CR20191711 CA0197300VPDCAM,PATRICK*17W04:33:4001:54:20VPDGODOY,RAYMOND25E02:48:4002:48:4402:03:0820191021793PACIFIC BL // CHAMBERS, VERNONHBC01:54:3510/19/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191710 CA0197300VPDNEWTON,TODD*4302:51:2101:54:352019102179752D DR // HELIOTROPE, VERNONREC02:48:3710/19/2019VRECRPTVPDPEREZ,NICK*L203:02:0902:48:37VPDGODOY,RAYMOND25E02:48:4503:56:2302:54:06USTOWUS TOW02:56:39 02:56:4003:56:2303:22:53201910218025610 ALCOA AV, VERNONPATCK04:33:1010/19/20191015RPTDepartmentOCA NumberRMS JurisVPD CR20191712 CA0197300VPDNEWTON,TODD*4306:19:5104:33:29VPDCAM,PATRICK17W05:44:4404:33:44VPDGODOY,RAYMOND25E04:33:3806:19:5104:35:07201910218062526 S ALAMEDA, VERNON459AJERSEY MIKES05:43:1910/19/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191713 CA0197300VPDPEREZ,NICK*L205:43:47 05:43:4906:24:1605:45:18VPDCAM,PATRICK17W05:44:4507:42:3305:52:43VPD31E07:11:3307:11:36VPD32W07:06:2707:20:28VPDNEWTON,TODD4306:11:3905:51:441Page of 210/20/201901:30:35 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/19/201910/19/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910218244305 S SANTA FE AV, VERNON166R12:03:4810/19/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191714 CA0197300VPDVILLEGAS,RICHARD*32W12:04:3113:02:5812:19:25201910218306239 HOOD, VERNONDET15:23:0010/19/20191015RPTVPDESCOBEDO,ALEXY*5D3401:30:2315:23:00VPDRAMOS,JOSE5D3501:30:2315:29:4420191021832S ATLANTIC BL // 52, VERNON20002RZACH AUSTIN18:15:1510/19/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191715 CA0197300VPDCERDA,EUGENIO*31E18:19:05 18:19:2819:07:4218:24:37* Denotes Primary Unit2Page of 210/20/201901:30:35 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/201910/20/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191021861FRUITLAND // CARMELITA, VERNONVCK00:59:5010/20/2019RPTVSDepartmentOCA NumberRMS JurisVPD CR20191716 CA0197300VPDENCINAS,ANTHONY*4301:45:3800:59:56MR C TOWMR C TO01:04:49 01:04:5001:45:3801:21:22201910218654501 PACIFIC BL, VERNONTRAFFIC STOP01:54:1810/20/20191015RPTDepartmentOCA NumberRMS JurisVPD CR20191718 CA0197300VPDCAM,PATRICK*32W03:58:2201:54:18VPDGODOY,RAYMOND38E01:54:2002:26:4701:56:01201910218663677 BANDINI BL, VERNON901TSPRINT 866-398-328402:14:3010/20/2019RPTVI1015DepartmentOCA NumberRMS JurisVPD CR20191717 CA0197300VPDENCINAS,ANTHONY*4302:15:4706:36:4002:19:09VPDCERDA,PAUL,JR20E18:09:04VPDREDONA,BRYAN2505:14:1205:01:34VPDREDONA,BRYAN25E06:54:1318:09:0806:57:59VPDGODOY,RAYMOND38E02:26:4807:33:1402:29:52VPDESCOBEDO,ALEXY5D3402:27:5206:13:1402:34:25VPDRAMOS,JOSE5D3506:13:1602:27:55VPDHERRERA,GUSTAVOS602:19:1004:45:1202:21:25VPDONOPA,DANIELS712:38:5915:17:0612:57:23USTOWUS TOW05:07:30 05:08:0006:36:4305:21:57201910218694501 DOWNEY RD, VERNON459AGEE GEE LIQUOR03:52:0010/20/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191719 CA0197300VPDCAM,PATRICK*32W04:03:5906:12:5704:07:08VPDREDONA,BRYAN2504:15:4605:01:3304:17:31VPDRAMOS,JOSE5D3504:08:5105:46:4804:12:35VPDHERRERA,GUSTAVOS604:45:1205:44:4204:54:201Page of 210/21/201900:10:51 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/201910/20/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910218694501 DOWNEY RD, VERNON459AGEE GEE LIQUOR03:52:0010/20/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191719CA0197300VPDXS105:48:0904:12:44201910218893653 SIERRA PINE AV, VERNONREC10:52:2710/20/2019VRECVSRPTDepartmentOCA NumberRMS JurisVPDCR20191720CA0197300VPDVILLEGAS,RICHARD*31W10:54:36 10:54:5812:55:2910:56:47MR C TOWMR C TO11:00:02 11:00:0312:55:3011:12:20* Denotes Primary Unit2Page of 210/21/201900:10:51 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/21/201910/21/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910219174833 FRUITLAND AV, VERNONREPOUNK00:24:1010/21/2019REPORPTDepartmentOCA NumberRMS JurisVPDCR20191721CA0197300VPDESCOBEDO,ALEXY*5D3400:25:4700:25:35VPDRECORDS BUREAURECD00:41:1500:25:43201910219384950 S SANTA FE AV, VERNONREC07:23:2910/21/2019VSDepartmentOCA NumberRMS JurisVPDCR20191722CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*4308:05:2407:23:56201910219482485 E VERNON AV, VERNON902TUNK08:43:4210/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191723CA0197300VPDVILLEGAS,RICHARD*32E08:46:1509:08:4708:48:59VPDREDONA,BRYAN26W09:25:1709:02:45201910219492838 LEONIS BL, VERNON594RPRICE ZONE09:01:2910/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191724CA0197300VPDREDONA,BRYAN*26W09:25:30 09:25:4109:54:5209:31:48201910219515725 S DISTRICT BL, VERNON459RJOES PLASTICS09:12:0710/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191725CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*4309:26:06 09:26:0711:22:4709:38:1520191021956E 38TH // SANTA FE AV, VERNON901TVERIZON WIRELESS 1-800-451-524210:40:2710/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191726CA0197300VPDREDONA,BRYAN*26W10:41:23 10:42:0311:22:1010:42:38VPDVILLEGAS,RICHARD32E11:22:1010:49:16201910219571Page of 310/22/201904:56:00 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/21/201910/21/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910219574515 S SOTO, VERNON484RENGINE TREND10:51:0810/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191727CA0197300VPDREDONA,BRYAN*26W11:23:1311:23:53VPDVILLEGAS,RICHARD32E11:23:4912:08:1911:28:07201910219611950 E 25TH, VERNON484RNURI IMPORTS11:34:1010/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191728CA0197300VPDREDONA,BRYAN*26W11:41:49 11:42:1712:09:1112:03:38201910219625837 S DISTRICT BL, VERNON140GEORGE11:47:5910/21/2019SUPVPDFINO,MARCUS*20E12:53:3813:24:1813:21:31VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO4313:06:2113:11:32 13:24:3213:24:00201910219644727 E 49TH, VERNON140UNK11:59:1510/21/2019SUPVPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*4312:10:5412:01:59VPDVILLEGAS,RICHARD32E13:03:4812:49:54VPDVILLEGAS,RICHARDXS13:38:5613:06:17201910219664700 E DISTRICT BL, VERNON240RINTERNATIONAL DESIGN12:05:0010/21/2019NRDRPTDepartmentOCA NumberRMS JurisVPDCR20191729CA0197300VPDVILLEGAS,RICHARD*32E12:08:2612:49:5112:18:46VPDREDONA,BRYAN26W12:09:1712:49:4312:19:08VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO4312:10:5913:06:1012:17:30201910219671916 E 51ST, VERNON20002RPUNCH PRESS12:29:2710/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191730CA01973002Page of 310/22/201904:56:00 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/21/201910/21/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910219671916 E 51ST, VERNON20002RPUNCH PRESS12:29:2710/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191730CA0197300VPDREDONA,BRYAN*26W12:50:2514:21:2012:58:59201910219685725 S DISTRICT BL, VERNON140JOES PLASTICS13:09:5910/21/2019SUPVPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*4313:12:50 13:57:0213:11:38VPDFINO,MARCUS20E13:50:5613:24:20201910219692929 E 50TH, VERNONASSISTFDQUICKWAY TRUCKING13:48:3710/21/2019RPTASSTVPDFINO,MARCUS*20E13:51:3114:12:3213:55:23201910219754820 E 50TH, VERNON484BON APPETITE15:15:1710/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191731CA0197300VPDFINO,MARCUS*20E15:32:2515:50:33 16:39:5515:39:43201910219973278 E SLAUSON AV, VERNON459RAMPM23:14:4310/21/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191732CA0197300VPDCAM,PATRICK*26E23:16:01 23:16:0423:48:1623:27:26VPDLUCAS,JASON31W23:16:03 23:16:0723:44:0723:27:23201910219984525 DISTRICT, VERNON314GLEN ROSE MEAT23:56:1210/21/2019ASSTRPTDepartmentOCA NumberRMS JurisVPDCR20191733CA0197300VPDCAM,PATRICK*26E23:57:40 23:57:4300:31:3023:59:53VPDLUCAS,JASON31W23:57:41 23:57:4600:31:3123:59:56VPDLANDA,RAFAELXS00:31:3200:19:083Page of 310/22/201904:56:00 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/22/201910/22/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022004S BOYLE AV // LEONIS BL, VERNON242IGNACIO PADILLA06:29:2210/22/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191734 CA0197300VPDCERDA,EUGENIO*MET106:32:17 06:32:1809:35:4006:37:04VPDMACIEL,CYNTHIA2P806:51:16 06:51:1708:40:5807:00:18VPDENCINAS,ANTHONY4106:37:0607:24:3606:41:36VPDVILLEGAS,RICHARD4307:22:06 07:22:0709:35:3907:25:38201910220093305 BANDINI BL, VERNON902TFLYING FOOD GROUP07:55:1010/22/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191735 CA0197300VPDREDONA,BRYAN*26E07:57:08 07:57:0908:48:3308:04:42VPDSTEVENSON,KENT,JR/VASQUEZ,LUIS32W08:10:2908:48:3408:35:04VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO41E08:08:56 08:09:0108:10:35201910220305500 S BOYLE AV, VERNON20002UNK10:21:5210/22/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191736 CA0197300VPDSTEVENSON,KENT,JR/VASQUEZ,LUIS*32W10:24:03 10:24:0411:15:2210:32:58VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO41E10:29:1211:15:2310:31:52201910220383251 LEONIS BL, VERNONTRAFFIC STOP11:29:0010/22/2019RPTVPDSTEVENSON,KENT,JR/VASQUEZ,LUIS*32W11:53:1611:29:0020191022044PACIFIC BL // SANTA FE AV, VERNON902TVERIZON WIRELESS 1-800-451-524211:57:2710/22/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191737 CA0197300VPDFINO,MARCUS*20W12:00:08 12:00:0812:02:32 12:59:1112:03:39VPDVILLEGAS,RICHARD4312:04:1812:23:1012:07:54201910220821Page of 210/23/201900:35:17 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/22/201910/22/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910220824410 E DISTRICT BL, VERNONVCK17:43:4610/22/2019RPT1015DepartmentOCA NumberRMS JurisVPDCR20191738CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*41E19:02:2717:43:46* Denotes Primary Unit2Page of 210/23/201900:35:17 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/23/201910/23/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022108FRUITLAND AV // CUDAHY, VERNONVCK04:03:1010/23/2019RPTVRECDepartmentOCA NumberRMS JurisVPD CR20191739 CA0197300VPDLUCAS,JASON*31W04:59:3304:03:1020191022110BANDINI BL // ATLANTIC BL, VERNON901TCHP04:28:2310/23/2019RPTVSORDepartmentOCA NumberRMS JurisVPD CR20191740 CA0197300VPDLANDA,RAFAEL*41W04:28:52 04:28:5306:17:0004:34:11VPDCERDA,PAUL,JR32E04:31:2305:34:5904:37:2820191022115S DISTRICT BL // ATLANTIC BL, VERNONSRMET07:07:5610/23/2019METRPTDepartmentOCA NumberRMS JurisVPD CR20191741 CA0197300VPDOURIQUE,CARLOS*MET108:42:1507:07:56201910221182241 E 49TH, VERNON487RREPUBLIC FURNITURE07:16:1410/23/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191742 CA0197300VPD*41W07:21:5907:57:0807:25:52201910221706172 S BOYLE AV, VERNON20002RUNITED FOOD DISTRIBUTION14:14:0810/23/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191743 CA0197300VPDDOCHERTY,MICHAEL*32E14:18:1615:46:0114:19:08201910221784415 BANDINI BL, VERNON594RNEW CAL15:33:4910/23/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191744 CA0197300VPDVALENZUELA,FERNANDO*25E16:29:0715:48:43201910221851Page of 210/24/201900:40:46 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/23/201910/23/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910221855353 DOWNEY RD, VERNON594RJ AND J SNACK FOODS16:48:1410/23/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191745CA0197300VPDDOCHERTY,MICHAEL*32E16:51:0717:45:2516:51:27VPDVALENZUELA,FERNANDO25E16:51:1516:51:29201910221995526 S SOTO, VERNONPATCK21:19:5610/23/2019RPT1015DepartmentOCA NumberRMS JurisVPDCR20191746CA0197300VPDLUCAS,JASON*31E22:24:5921:19:56VPDCERDA,PAUL,JR32W21:26:19 21:26:1921:44:0621:28:58201910222005901 MAYWOOD AV, HUNTINGTON PARKWARRANTHPPD21:31:1510/23/20191015VPDCERDA,PAUL,JR*32W21:44:09 21:44:1422:35:4421:49:56VPDLANDA,RAFAEL4121:53:1822:14:0321:57:49* Denotes Primary Unit2Page of 210/24/201900:40:46 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/24/201910/24/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022214SEVILLE AV // VERNON AV, VERNON902TLT PEREZ08:10:4210/24/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191747 CA0197300VPDSWINFORD,PHILLIP*32W08:11:4608:51:5108:14:28VPDVALENZUELA,FERNANDO2508:51:5108:15:55201910222155705 ALCOA AV, VERNON459RSANDBERG FURNITURE08:10:2710/24/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191748 CA0197300VPDVASQUEZ,LUIS*26E08:12:5410:37:3708:18:06201910222222550 S ALAMEDA, VERNONRECJERSEY MIKE10:48:2810/24/2019VRECRPTDepartmentOCA NumberRMS JurisVPD CR20191749 CA0197300VPDSWINFORD,PHILLIP*32W10:51:22 10:52:2211:31:3411:02:53201910222242503 E VERNON AV, VERNON487RCR LAURENCE11:19:0810/24/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191750 CA0197300VPDSWINFORD,PHILLIP*32W11:31:3912:16:4811:37:04VPDVALENZUELA,FERNANDO2512:13:4511:48:43201910222414700 E DISTRICT BL, VERNON242RINTERNATIONAL PRIDE15:48:4410/24/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191751 CA0197300VPDVASQUEZ,LUIS*26E15:53:2016:32:5915:55:2320191022242S BOYLE AV // LEONIS BL, VERNON902TFRANCISCO GARCIA16:59:2010/24/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191752 CA0197300VPDVASQUEZ,LUIS*26E17:01:0517:01:42VPDVALENZUELA,FERNANDO2517:01:3918:23:5017:06:35VPDSWINFORD,PHILLIP32W17:01:4918:07:0517:10:151Page of 210/25/201905:54:40 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/24/201910/24/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022254E SLAUSON AV // DOWNEY RD, VERNONPEDCK21:36:5510/24/2019RPT1015DepartmentOCA NumberRMS JurisVPDCR20191753CA0197300VPDOURIQUE,CARLOS/MANNINO,NICHOLAS*4322:36:5921:36:55VPDHERNANDEZ,MIGUEL,JR31E22:06:4121:42:40201910222604201 ROSS ST, VERNON602SOSA CARLOS22:32:3810/24/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191754CA0197300VPDSANTOS,DANIEL*S222:35:3222:54:0722:43:21VPDOURIQUE,CARLOS/MANNINO,NICHOLAS4322:37:0300:22:3322:43:20* Denotes Primary Unit2Page of 210/25/201905:54:40 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/25/201910/25/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022271E DISTRICT BL // LOMA VISTA AV, VERNONTRAFFIC STOP02:39:2410/25/2019RPT1015DepartmentOCA NumberRMS JurisVPD CR20191755 CA0197300VPDHERNANDEZ,MIGUEL,JR*31E03:51:2602:39:24VPDCERDA,PAUL,JR41W02:59:0002:45:38VPDOURIQUE,CARLOS/MANNINO,NICHOLAS4304:24:5102:48:0720191022283E SLAUSON AV // ALCOA AV, VERNON901TLIZETTE08:32:2110/25/2019RPTORDepartmentOCA NumberRMS JurisVPD CR20191756 CA0197300VPDCERDA,EUGENIO*40E08:33:1210:13:0508:35:11VPDVASQUEZ,LUIS26E08:33:4510:13:0408:35:17VPDVALENZUELA,FERNANDO31W08:49:0708:35:43USTOWUS TOW09:02:19 09:02:4809:50:51 10:13:0509:23:06201910222862360 E VERNON AV, VERNON911AVERNON ELEMENTARY09:03:2910/25/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191757 CA0197300VPDVALENZUELA,FERNANDO*31W09:09:5310:50:1009:11:00VPDMARTINEZ,GABRIELS510:11:1409:26:51VPDONOPA,DANIELS710:11:2509:26:53201910222873031 E VERNON AV, VERNON925AM PM10:26:3010/25/20191015RPTDepartmentOCA NumberRMS JurisVPD CR20191758 CA0197300VPDSWINFORD,PHILLIP*43W10:26:55 10:27:1912:13:3110:31:23VPDVASQUEZ,LUIS26E10:56:5010:31:25VPDCERDA,EUGENIO40E10:26:59 10:27:2512:13:3110:29:57VPDMARTINEZ,GABRIELS510:29:3711:41:0910:31:29VPDONOPA,DANIELS710:29:3511:41:1410:31:54201910222895705 ALCOA AV, VERNON484RSANDBERG FURNITURE11:17:0810/25/2019SUP1Page of 210/26/201900:03:10 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/25/201910/25/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910222895705 ALCOA AV, VERNON484RSANDBERG FURNITURE11:17:0810/25/2019SUPVPDVASQUEZ,LUIS*26E11:25:5112:33:4511:34:33201910223103280 E 26TH, VERNON602SOEX20:51:3810/25/2019RPT1015DepartmentOCA NumberRMS JurisVPDCR20191759CA0197300VPDESTRADA,IGNACIO*S321:00:2221:45:56 21:01:2521:05:32VPDGODOY,RAYMOND25E21:00:3622:14:3221:05:25VPDSANTOS,DANIELS221:00:2621:46:01 21:01:2521:05:29201910223154461 S SANTA FE AV, VERNON902TLUIS21:32:1210/25/20191015RPTVIDepartmentOCA NumberRMS JurisVPDCR20191760CA0197300VPDNEWTON,TODD*40W21:33:57 21:34:5322:28:5021:35:16VPDOURIQUE,CARLOS/MANNINO,NICHOLAS4321:34:5223:28:2521:41:14MR C TOWMR C TO22:15:44 22:15:4523:05:1122:26:28* Denotes Primary Unit2Page of 210/26/201900:03:10 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/26/201910/26/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022336S DISTRICT BL // HELIOTROPE, VERNONPEDCK03:00:0910/26/20191015RPTDepartmentOCA NumberRMS JurisVPDCR20191761CA0197300VPDOURIQUE,CARLOS/MANNINO,NICHOLAS*4303:54:1903:00:09VPDNEWTON,TODD40W03:42:4103:04:49201910223453751 SEVILLE AV, VERNON594RLIONNEL06:30:3310/26/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191762CA0197300VPDNEWTON,TODD*40W06:34:39 06:35:2407:11:4206:37:35VPDGODOY,RAYMOND25E06:34:40 06:35:2607:11:4106:38:4120191022400RANDOLPH // BOYLE AV, VERNONPEDCK23:52:5210/26/20191015RPTDepartmentOCA NumberRMS JurisVPDCR20191763CA0197300VPDOURIQUE,CARLOS/MANNINO,NICHOLAS*4300:41:3523:52:52* Denotes Primary Unit1Page of 110/27/201900:45:53 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/27/201910/27/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022427RANDOLPH // BOYLE AV, VERNONPATCK08:58:1510/27/20191015RPTDepartmentOCA NumberRMS JurisVPDCR20191764CA0197300VPDREDONA,BRYAN*31E10:35:0808:58:15VPDCERDA,EUGENIO4108:58:43 08:58:4309:16:2609:05:11VPDVILLEGAS,RICHARD43W09:22:0409:04:48201910224624423 FRUITLAND AV, VERNON242RJR FRISCO INC22:29:3910/27/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191765CA0197300VPDHERNANDEZ,MIGUEL,JR*38E22:56:3623:48:4923:03:00VPD2522:32:29 22:32:3023:48:4722:40:28VPDENCINAS,ANTHONY32W22:33:26 22:33:2723:08:5522:38:55* Denotes Primary Unit1Page of 110/28/201900:02:01 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/28/201910/28/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022491E 49TH // SANTA FE AV, VERNON901TR06:48:2710/28/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191766 CA0197300VPDHERNANDEZ,MIGUEL,JR*38E07:11:4806:48:27VPDGODOY,RAYMOND2507:08:5906:49:25VPDENCINAS,ANTHONY32W07:34:2506:49:0720191022501S SANTA FE AV // 38TH, VERNON20002T-MOBILE (877) 653-791108:18:3710/28/2019VSRPTDepartmentOCA NumberRMS JurisVPD CR20191767 CA0197300VPDREDONA,BRYAN*38W08:20:45 08:20:4809:07:5708:22:45VPDFINO,MARCUS17W08:21:4508:56:3308:23:2820191022518S SANTA FE AV // 25TH, VERNON902T11:00:1810/28/2019RPT1015DepartmentOCA NumberRMS JurisVPD CR20191768 CA0197300VPDREDONA,BRYAN*38W12:17:3711:00:19201910225214950 S SANTA FE AV, VERNON476RCRYSTAL ART GALLERY11:47:0910/28/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191769 CA0197300VPDFINO,MARCUS*17W11:48:49 11:49:0612:14:0711:52:40VPDVILLEGAS,RICHARD31E12:14:0711:53:30201910225253007 BANDINI BL, VERNONPLATEASAMO12:45:0210/28/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191771 CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*43E12:48:18 12:48:4413:38:0513:00:27201910225275993 MALBURG WY, VERNON459VRCARGO CUBE13:02:0110/28/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191770 CA0197300VPDREDONA,BRYAN*38W13:04:07 13:04:1913:32:1713:12:581Page of 210/30/201902:45:49 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/28/201910/28/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910225514305 S SANTA FE AV, VERNON911A18:21:0510/28/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191779CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*43E18:50:4618:21:0520191022554E 37TH // ROSS, VERNON273.5BERNICE ANGUIANO19:18:4510/28/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191772CA0197300VPDOURIQUE,CARLOS*32W19:22:08 19:22:5219:49:5819:26:49VPDLANDA,RAFAEL40W19:25:5700:35:1319:30:5820191022555S DISTRICT BL // ATLANTIC BL, VERNON909TDEMETRIUS20:17:4710/28/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191773CA0197300VPDLUCAS,JASON*25E20:21:55 20:22:0022:14:4220:26:15VPDHERNANDEZ,MIGUEL,JR26E22:13:5721:45:09VPDHERRERA,GUSTAVOS620:36:5921:44:5120:42:54* Denotes Primary Unit2Page of 210/30/201902:45:49 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/29/201910/29/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910225734400 S SANTA FE AV, VERNONTRAFFIC STOP01:26:5410/29/2019RPTVI1015DepartmentOCA NumberRMS JurisVPD CR20191774 CA0197300VPDOURIQUE,CARLOS*32W03:24:0601:26:54VPDLUCAS,JASON25E01:29:58 01:30:0202:18:5201:36:27201910225905015 E DISTRICT BL, VERNON484RSTONE HARBOR07:33:3510/29/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191775 CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*40W07:37:57 07:38:2708:26:5408:08:13201910226102600 E 28TH, VERNON920PRFED EX GROUND10:24:2910/29/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191776 CA0197300VPDRECORDS BUREAU*RECD10:43:0210:26:32201910226255610 ALCOA AV, VERNON459MODERN PATTERN12:25:1810/29/2019RPT1015DepartmentOCA NumberRMS JurisVPD CR20191777 CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO*40W12:27:25 12:27:2814:12:0212:38:29VPDFINO,MARCUS20E12:27:4513:54:0212:30:41VPDSTEVENSON,KENT,JR/REDONA,BRYAN4312:27:3713:15:2512:38:27VPDCERDA,EUGENIOMET112:44:4312:31:08201910226335030 GIFFORD AV, VERNON459VRPREMIER MEAT CO16:00:4310/29/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191778 CA0197300VPDSTEVENSON,KENT,JR*31E16:02:36 16:02:3716:28:2816:08:2320191022643BANDINI BL // AYERS AV, VERNON901TELVIN17:27:2410/29/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191781 CA0197300VPDREDONA,BRYAN*4317:32:30 17:32:3018:50:5417:37:251Page of 210/30/201902:44:42 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/29/201910/29/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20191022643BANDINI BL // AYERS AV, VERNON901TELVIN17:27:2410/29/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191781CA0197300VPDZOZAYA,OSCAR/MADRIGAL,ALFONSO40W18:04:17 18:04:1818:50:5418:15:45201910226443390 E SLAUSON AV, VERNON484RICON SPORTS17:47:4010/29/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191780CA0197300VPDSTEVENSON,KENT,JR*31E17:56:02 17:56:0318:43:4417:59:3120191022645S SANTA FE AV // VERNON AV, VERNON920PRVICKY HARRIS18:42:4710/29/2019RPTVPDCERDA,PAUL,JR*32E19:04:4819:05:01* Denotes Primary Unit2Page of 210/30/201902:44:42 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/30/201910/30/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910226785500 S SOTO, VERNONSRMET08:48:0710/30/2019METRPTDepartmentOCA NumberRMS JurisVPD CR20191782 CA0197300VPDOURIQUE,CARLOS*MET111:03:3108:48:09201910226812145 E 49TH, VERNON902TJACOB FARM09:31:5410/30/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191783 CA0197300VPDDOCHERTY,MICHAEL*43W09:34:17 09:34:3310:44:2409:41:26201910226852435 E 37TH, VERNON459RMAAS HANSEN10:27:2510/30/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191784 CA0197300VPDDOCHERTY,MICHAEL*43W10:44:4410:45:01VPDZOZAYA,OSCAR3210:44:4711:25:5610:50:4620191022697S SANTA FE AV // FRUITLAND AV, VERNON901TRMILLY13:32:1710/30/2019RPTDepartmentOCA NumberRMS JurisVPD CR20191785 CA0197300VPDDOCHERTY,MICHAEL*43W13:33:1913:34:18 14:18:2313:39:53VPDVALENZUELA,FERNANDO26E14:18:2213:34:16VPDZOZAYA,OSCAR3213:38:1114:18:2213:45:38201910227002221 E 55TH, VERNON92514:47:2210/30/2019RPT1015VPDDOCHERTY,MICHAEL*43W14:48:2015:52:3615:23:54VPDCHAVEZ,JERRY,JRS115:15:5215:23:58201910227014305 S SANTA FE AV, VERNONDET15:05:1310/30/20191015VPDVELEZ,MARISSA*5D3416:31:2115:05:13VPDCROSS,JEREMY5D3016:31:2115:05:291Page of 210/31/201901:57:34 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/30/201910/30/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910227014305 S SANTA FE AV, VERNONDET15:05:1310/30/20191015VPDGAYTAN,LORENZO5D3116:31:2115:05:25VPDRAMOS,JOSE5D3516:31:2216:07:38201910227022660 E 37TH, VERNON901T-MOBILE (877) 653-791115:08:0610/30/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191786CA0197300VPDZOZAYA,OSCAR*3215:08:3816:20:3615:19:38VPDVALENZUELA,FERNANDO26E15:10:3116:20:3615:11:5920191022706FRUITLAND AV // BOYLE AV, VERNONTRAFFIC STOP16:24:5210/30/2019RPTVS1015DepartmentOCA NumberRMS JurisVPDCR20191787CA0197300VPDZOZAYA,OSCAR*3218:38:2816:24:54VPDVALENZUELA,FERNANDO26E16:27:2916:28:17VPDDOCHERTY,MICHAEL43W17:00:4216:28:15* Denotes Primary Unit2Page of 210/31/201901:57:34 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/31/201910/31/2019Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene201910227385001 S SOTO, VERNONFOUNDINDIEEV14:39:1510/31/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191789CA0197300VPDVASQUEZ,LUIS*25W14:44:15 14:44:2914:45:38VPDVALENZUELA,FERNANDO26E14:53:2116:03:5114:54:5020191022740ALCOA AV // LEONIS BL, VERNON902TTHOMAS14:44:4010/31/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191788CA0197300VPDVASQUEZ,LUIS*25W15:55:2314:45:52201910227432360 E VERNON AV, VERNON484RVERNON CITY SCHOOL15:40:0710/31/2019RPTDepartmentOCA NumberRMS JurisVPDCR20191791CA0197300VPDDOCHERTY,MICHAEL*4015:40:4516:07:48201910227556542 MILES, HUNTINGTON PARKWARRANT19:33:4610/31/20191015RPTVPDCERDA,PAUL,JR*41E20:56:4219:33:47* Denotes Primary Unit1Page of 111/01/201905:08:11 City Council Agenda Item Report Agenda Item No. COV-502-2019 Submitted by: Cynthia Cano Submitting Department: Public Works Meeting Date: December 3, 2019 SUBJECT Public Works Department October 2019 Monthly Building Report Recommendation: A. Receive and File. Background: The attached building report consists of total issued permits, major projects, demolition permits, new building permits and certificate of occupancy status reports for the month of October 2019. Fiscal Impact: None. ATTACHMENTS 1. October 2019 Building Report lanua.y February March April City of Vernon Buildint Oivision Monthly Report Summary Monthly t-a tt" a."" I2018 Construction value I20t9 Construction Value -2018 Numberof permrts-2019 N!mberot permts June ,u Autust September Odober 570,0o0,0o0 550,0O0,0o0 s50,000,000 940,000,000 s30,000,000 S20,ooo,mo Slo,ooo,ooo s sr20,000,000 Sloo,om,ooo Sm,ooo,ooo 560,000,000 s40,000,000 s20,000,000 s, r00 90 80 70 60 50 4A 30 20 10 0 .r9.8 aatt {tt r""t tt,s JJEL ..-t ."""' - 12018 Y€ar to Oate V.lue - 2019 year to Oere Vatue -2018 Yea. to Date Permits-2019 year to Dat€ permits "d ""d "" "c- +d ,"e o *"'_"C a 700 600 500 400 300 200 100 0 Year to Date Permit Difrerence Valuation oifference -13%78% 79% -6%38% -79%-52% -24%-29% r6./.-t6% 18%-18% -20%-19% 24%-20% -25%-78% Year to Date 2018 2019 Construction value Numbe, ol Permiti Year to Dale value Year to Date Permits Construction Value N!mber of Permits Year to Oate value Year to Oate PerftilsS 5,887,530 56 S s,887,s30 56 6,968,160 49 s 6.968.160 49; 4,L45,729 49 S 10.033.2s9 105 S 4,923,13s 53 S 11.891.29s 712 6,562,749 55 S 16.s96.048 770 S 10,949,664 47 s 22.840.960 159s s9,122,a7r 95 s 7s,718,919 265 s 13.285.075 56 5 36,126,03s 215 S 4.6s0.930 14 5 80,369,849 339 521.264.2a2 43 s s7,390,317 2s85 2.rss.720 50 S 82.s2s.s69 389 S12.186.470 61 5 69,s76,7a7 32s5 s.9s0.672 t1 S 88,476,24r 450 ;3,301,660 53 5 72,878,447 318S 5,473,427 64 S 93,949,668 574 S 3,283,700 4\5 76,162,t47 419s 2,674,832 69 s 96,624,s00 593 S 1.400.42G 29 5 i7,562,s73 4485 4,471,77L s8 S 101,096,271 651 ;5,478,852 43 s 83,041.425 491 Type Demolition Electrical lndustrial - Remodel Mechanical Miscellaneous Plumbing Roof City of Vernon Building Department Monthly Report from '10/'l12019 to 10/31/20'19 OCtObEr 2019 TOTALS PERMITS PREVIOUS MONTHS TOTAL YEAR TO DATE TOTAL October 2018 TOTALS PERMITS: PREVIOUS MONTHS TOTAL PRIOR YEAR TO OATE TOTAL Value $2,000.00 $573,933.62 $2,398,257.00 $ 1,404,228.00 $768,983.00 $ 171 ,000.00 $160,450.00 # of Permits 1 13 5 I 11 4 I 95,478,851.62 $77,562,573.38 43 448 $83,041,425.00 $4,47 1 ,77',1 .30 $96,624, s00.14 49'l 58 593 '$101,096,271.40 651 I iel Wall Director of Public Works Proiect Address City of Vernon Building Department Major Projects from 10/1/2019 to 1)l31t2l1g Valuations > 20,000 Tenant Description Job Electrical B-2019-3765 4820 sOTH ST APN 6304011006 521 5 BOYLE AVE APN 6310009021 4328 ALCOA AVE APN 6303010038 3152 BANDINI BLVD APN 630300702'l 2651 APN 4sTH ST 6308005021 2422 APN 28TH ST 6302005007 B-2018-2943 B-2019-3550 B-2019-3690 B-2019-3694 B-2019-3789 4 Record(s) lndustrial - Remodel 8-2019-3543 4328 ALCOA AVE APN 6303010038 B-2019-3742 B-2019-3692 51OO BOYLE AVEAPN 6303028014 Bhj 4 Miscellaneous B-2019-3674 Record(s) Prologis New freezer cooler 10,806 SF INTERIOR OFFICE T,I, . INSTALL LIGHT FIXTURES IN OFFICE SPACE AND CONDUITS TO TELEPHONE Tenant lmprovements to accomodate sugarfish, vovo and Fiscco in the building - Electrical Only Electncal for fuel system upgrades lndustrial remodel; Tl new metal frame walls, insulated panels, sloping floors & curbs. New men's and women's restroom new womens locker room, new otfice. New cooler, freezer, cold dock Build a small wood frame wall in the front otfice to divide units 2422 and 2424. Build steel frame demising wall (as it was before) warehouse. Condenser - queipment replacement New offlce Tl. HVAC, Type I & ll Hoods, Make-up air fans, exhaust fans lnstall 5 evaporalor coolers Refrigeration - new condenser.4 freezer coils and high pressure receiver. Deferred submittal - aluminum storefront Sugarfash CEG Baker Cold Storage CEG Superior Lithographi 200000 100000 175000 52000 $527,000.00 2000000 75000 286557 30700 $2,392,257 .00 179855 70000 1035473 $1,385,328.00 259977 Record(s) 4328 ALCOA AVE APN 6303010038 41OO BANDINI BLVD APN 6304005019 B-2019-3545 8-2019-3673 5215 BOYLE AVE Prologis Deferred submittal - aluminum 293506 Permit No. 2929 54TH STAPN 631000902.1 4567 LOMA VISTA AVE APN 6304022059 3055 BANDINI BLVD APN 6303002014 4 Mechanical B-2019-3808 B-2019-3724 100000 B-2019-3629 B-2019-3498 B-201S-3306 B-2019-3743 B-2019-3769 California Aluminum APN 6310009021 49OO SOTO ST APN 6303023008 53OO BOYLE AVE APN 6310008020 Record(s) 4328 ALCOA AVE APN 6303010038 4220 CHARTER ST APN 630402'1031 Record(s) 4722 EVERETT AVE APN 6304025005 Sprint Bandini Truck Stop Sprint OC Engineering storefront Pallet racks - storage height not to exceed 12 Feet. Sprint will remove (3) radios and swap (3) existing antennas with (3) new antennas and associated cabling. lnstall (1) 9212 cabinet and install (2) mMIMO BBU in 9712 cabinet. lnstall (1) mMIMO BBU in existinq MMBTS Cabinet. lnstallation of new 79'-9" x 20 -0" canopy, installation of new fuel island and replacement of existing dispensers Sprint will remove (3)radios and swap (3) existing antennas with (3) new antennas and associated cabling. !nstall (1) 9212 cabinet and install (2) mMiMo BBU in 9712 cabinet. lnstall (1) mMIMO BBU in existinq MMBTS cabinet. lnstall equipment inside existing cabinets; Remove (3) panel antennas and (3) RRU's from tower, install (3) new panel antennas; (3) new RRU'S, (1) 6x12 HCS cable and ('12)jumper cables on tower. Plumbing; new restroom, breakroom, sloping floor Wdrains, sinks 30000 24500 47000 24500 30000 38500 3152 BANDINI BLVD APN 6303007021 $747,983.00 150000 1 Roof B-2019-3774 $1s0,000.00 1 $160,450.00 22 Permit(s)Total $s,363,018.00 niel Wall Director of Public Works B-2019-3496 8 Plumbing B-2019-3544 2955 VERNON AVE APN 6302020051 41OO BANDINI BLVD APN 6304005019 Record(s) rPlanet Earth Footings, foundations, trenches and anchordesign for plan rekofit. Approximately 'l 10 cubic yards of concrete. Rerooflng and replacement of sky lights. 160450 I City of Vernon Certificate of Occupancy Applications Date From 101112019 to 1013112019 lssued Permit No. Proiect Address Tenant Description Fees Paid Squa re Feet c-2019-1 369 4433 PACIFIC BLVD Organic Generation lnc APN 6308006015 c-2019-1370 Wholesale clothing 385 00 88 5.00 3 85.00 Cutting Service 885.00 3851 SOTO ST APN 6302020059 2833 LEONIS BLVD APN 6303022004 5000 DISTRICT BLVD Cutisus lnc APN 630401 100s 5051 SANTA FE AVE APN 6308015012 American Current Care dba Concentra Urgent Care Urgent Care KKGM lnc Office usec-2019-1371 c-2019-1372 c-2019-1384 c-2019-1 385 c-2019-1 388 c-2019-1389 c-2019-1373 c-2019-1374 c-2019-1375 c-2019-1 376 c-2019-1377 c-201 9-'1378 3870 SEVILLE AVE APN 6302020047 5075 PACIFIC BLVD APN 6308010017 4425 SOTO ST APN 6308001020 2404 APN 28TH ST 6302005004 4401 DOWNEY RD APN 6303017022 4401 DOWNEY RD APN 6303017022 4401 DOWNEY RD APN 6303017022 Sean Sager Creative Dba Set + Stage Creative B ue Red Corp By Yakin lnc Danny's Transit LLC Visual Prop Company Warehousing and garment cutting Office use I dispatching 3300 6175 1620 10000 2100 16455 3000 1 1850 3900 Tirehub, LLC Warehousing of Tires c-2019-1 386 5999 MALBURG WAY AMD Pennsylvania LLC APN 6310027046 Medical supply distribution c-201 9-1387 385 00 88 5.00 Garmentwarehouse 385.00 385 00 88 5.00 385 00 385 00 38 5.00 38 5.00 38 5.00 385.00 STAR CIry BEVERAGE LLC DBA STAR CITY BEVERAGE BOWERY. LLC Office use Office use PERFECT HYDRATION, LLC Office use KOE I, LLC KOE. LLC Office use BOWERY II, LLC Offlce use 100 100 100 100 '100 100 4401 DOWNEY RD APN 6303017022 4401 DOWNEY RDAPN 6303017022 4401 DOWNEY RD APN 6303017022 4401 DOWNEY RDAPN 6303017022 c-2019-1 379 BOWERY I. LLC Olfice use 385.00 '100 51780 Office use 38 5.00 1 lssued Permit No. Project Address Tenant Oescription Fees Paid Sq uare Feet c-20'1 9-'1380 c-2019-1381 c-2019-1382 c-2019-1383 c-2019 1390 4401 DOWNEY RD APN 6303017022 4401 DOWNEY RD APN 6303017022 4401 DOWNEY RD APN 6303017022 4401 DOWNEY RD APN 6303017022 3113 APN 26TH ST 5169032008 PERFECT HYDRATION I, LLC Offlce use STRATUS GROUP DUO, LLC DBA STRATUS GROUP PERFECT HYDRATION II, LLC Office use Office use KOE II, LLC SEWING COLLECTION, INC 385.00 385.00 3 8 5.00 385.00 0.00 100 100 100 100 125000Manufacturing of elastics and cords and redesign of clothing hangers Total for Certificate of Occupancy:10,085.00 236,280.00 Total Fees Paid 10,085.0022 Permits(s) 2 Office use lssued Permit No. Project Address Tenant Oescription Fees Paid Square Feet 1012t2019 C-2019-1220 1930 APN 51ST ST 6308016005 REZEX CORPORATION DBA GELTI/IAN INDUSTRIES 1017t2019 C-2019-1359 2424 APN 26TH ST 630200401s 10t8t20't9 c-2019-1358 2424 APN 26TH ST 6302004015 GOLD & SNOW WORLDWIDE USA INC Office use Y JACK INC Office and warehousing of clothing POPULAR BASICS CORP Warehousing of DBA POPULAR 21 garments BW EQUITY, LLC, DBA BROCHU WALKER The Plaza Market Manufacturing (textile finishing) Warehousing & distribution of garments with garment design Warehousing of Frozen Foods/Freezer Warehouse of general merchandise 2.65 5.00 385.00 38 5.00 885.00 0 00 000 385 00 385.00 38 5.00 38 5.00 38 5.00 38 5.00 385 00 24000 1200 31506 22969 96968 22114 300 100 100 100 100 100 100 10t221201 C-2019-1279 3055 FRUITLAND AVE APN 6303029007 10t24120't c-2019-1325 2650 LEONTS BLVD APN 6308003009 10t241201 C-2018-1058 2825 APN 44TH ST 6303013042 10126t201 C-2019-1271 2445 APN 26TH ST 516802601 8 10130t201 c-2019-1334 3'1 '13 APN 26TH ST 5169032008 10t30t201 c-2019-1373 4401 DOWNEY RD APN 6303017022 't0t30t201 c-20'19-1375 440't DOWNEY RD APN 6303017022 10130t201 c-201 9-1378 4401 DOWNEY RD APN 6303017022 10t301201 c-2019-1381 4401 DOWNEY RD APN 6303017022 't0t30t201 c-20'19-1374 4401 DOWNEy RD APN 6303017022 10t30t201 c-2019-1376 4401 DOWNEY RDAPN 6303017022 10t30t201 c-2019:1377 440.1 DOWNEY RD APN 6303017022 10130t201 c-2019j1379 4401 DOWNEY RO APN 6303017022 T-Mobile USA Cell site STAR CITY BEVERAGE Offlce use LLC DBA STAR CITY BEVERAGE PERFECT HYDRATION, Offlce use LLC BOWERY II, LLC Office use STRATUS GROUP DUO. Office use LLC DBA STRATUS GROUP BOWERY, LLC Office use KOE I, LLC Office use KOE. LLC Office use BOWERY I, LLC Office use 38 5.00 City of Vernon Certificate of Occupancy lssued Date From l0/1/2019 to 1013112019 885 00 385.00 500 100 LINEAGE LOGISTICS 1 100 lssued Permit No. Project Address Tenant Description Fees Paid Square Feet 10t30t201 c-2019-1380 440'1 DOWNEY RD APN 63030'17022 10t30t20't c-2019-1382 4401 DOWNEY RD APN 6303017022 10t30t201 c-2019-1383 4401 DOWNEY RD APN 6303017022 10/31t201 C-2019-1209 5764 ALCOA AVE APN 6310005009 10t31t201 c-2019-1206 2622 ALAMEDA ST APN 6302009038 PERFECT HYDRATION I, Of'ice Use LLC 385.00 PERFECT HYDRATION ll, Office use LLC 385.00 KOE II, LLC Office use 385 00 ADS LOGISTICS CO LLC Warehousing steel 1,046.00 FLASH JK INC Office use 38 5.00 100 100 100 66600 150 1 1001 '1 '1058 475 319 10t311201 C-2018-1066 2211E 27TH ST APN 10t31t201 C-2019-1232 3007 BANDINI BLVD APN 6303002014 10t31t201 C-2018-1'130 4199 BAND|N| BLVD APN 5243020018 10131t201 C-2015-0109 2800 SOTO ST APN 6303004801 32 Permits(s) T- i,4obile West Tower LLC Cell site EL COWBOY DISTRIBUTOR T-MOBILE ASAI\,1O INC VEFD001 Fire Station (LA-RrCS) NINETY6 COLLECTIVE LLC Cell site Warehousing of general merchandise 885 00 385 00 885.00 300.00 300.00 300.00 300.00 300.00 0.00 385.00 0 10t31t201 C-2015-0100 3375 FRUITLAND AVE APN 6303027900 Communication tower site Manufacturing of elastics and cords and redesign of clothing hangers Office use 10t311201 C-2015-0310 5503 BOYLE AVE APN 6310011001 STC ONE LLC 10/311201 C-2017-0617 5107 DISTRICT BLVD T - Mobile West Tower, LL@ell tower site APN 6304010015 10t31t201 C-2015-0306 2555 APN 52ND ST 6309009802 10t31t201 C-2015-0309 4415 PACTFIC BLVD APN 6308006014 14t31t201 C-2019-1390 31 13 APN 26TH ST 5169032008 SEWING COLLECTION. tNc 586 0 100 VEFD003 Fire Station (LA-RrCS) Communication tower site 300.00 15,585.00 41s,946.00 2 Total for Certificate of Occupancy: Total Fees Paid 15.586 00 10t31t201 C-20',t9-1260 3013 BANDINI BLVD APN 6303002014 Warehousing and distribution of general merchandise NCWPCS IVIPL 19 Cell tower site Cell site '125000 City of Vernon Building Department New Buildings Report - October 2019 None Daniel Wall Director Public Works City of Vernon Building Department Demolition Report - October 2019 3308 Bandini Blvd. Vernon Truck Wash, lnc. 800 sq. ft. I Wall Director of Public Works City of Vernon Building Department Status of Certificates of Occupancy Requests Month of October 2019 Reguest for lnspection Approved Pending Temporary Occupancies 22 32 366 16 iel Wall Director of Public Works I City Council Agenda Item Report Agenda Item No. COV-497-2019 Submitted by: Lissette Melendez Submitting Department: Public Works Meeting Date: December 3, 2019 SUBJECT Acceptance of Electrical Easement at 4224 District Blvd. (APN 6304-027-025) Recommendation: A. Find that the acceptance of the Electrical Easement proposed in this staff report is not a “project” as that term is defined under the California Environmental Quality Act (CEQA) Guidelines Section 15378, and even if it were a project, it would be categorically exempt in accordance with CEQA Guidelines Sections 15301 (maintenance, repair or minor alteration of an existing facility and involves negligible or no expansion of an existing use) and 15061(b)(3) (general rule that CEQA only applies to projects that may have a significant effect on the environment); and B. Accept the Electrical Easement and authorize the Mayor to execute the Certificate of Acceptance. Background: The property located at 4224 District Blvd. is being developed and an easement is needed for the installation and maintenance of City owned electrical conduit and equipment serving the property. The Public Works Department has received a fully executed Electrical Easement by Bridge Point Vernon LLC, a California limited liability company, owners for the property at the above-mentioned location, Assessor’s Parcel No. 6304-027-025. The easement has been reviewed and approved by the Vernon Public Utilities Department and has been approved as to form by the City Attorney’s Office. Fiscal Impact: Acceptance of the proposed Electrical Easement has no fiscal impact. ATTACHMENTS 1. Electrical Easement - 4224 District Blvd. 2. Certificate of Acceptance - EE 4224 District RECORDING REQUESTED BY and WHEN RECORDED MAIL TO: City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Attn: City Clerk MAIL TAX STATEMENTS TO: Exempt SPACE ABOVE THIS LINE RESERVED FOR RECORDER'S USL EASEMENT (ELECTRICAL) APN: 6304-027-025 DOCUMENTARY TRANSFER TAX IS NONE —NOT REQUIRED SEC. 11922 REVENUE TAXATION CODE. FOR VALUABLE CONSIDERATION, RECEIPT OF WHICH IS HEREBY ACKNOWLEDGED, Bridge Point Vernon, LLC, a California limited liability company (the "Grantor") HEREBY GRANTS) TO: City of Vernon, a municipal corporation (the "Grantee") An easement for every purpose beneficial to the Vernon Public Utilities Department, including, but not limited to, the right to construct, lay, install, use, maintain, alter, add to, repair, replace, inspect and remove underground and overhead electric and other public utilities, consisting of pole, guys and anchors, crossarms, wires, cables, conduits, manholes, vaults, pull boxes, markers and other fixtures and appliances with the right of ingress and egress in, on, over, under, across and through that certain real property in the City of Vernon, County of Los Angeles, State of California, as described in Exhibit "A" attached hereto and incorporated herein by this reference, and as more particularly shown on the map attached hereto as Exhibit "B" and incorporated herein by this reference. This easement is on a portion of the property owned by the Grantor. The Grantee, and its employees shall have free access to said facilities and every part thereof, at all times, for the purpose of exercising the rights herein granted. Date: ~G~~ v 2 I , 2019 "Grantor" Bridge Point Vernon, LLC, a California limited liability company ~.~~~ W ~~~a ~r~~ti e, e ign tt~r Name, Title Signuhi~•e ~~.~~~i~K~lNLED~iVI~f~~ A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validit of that document. State of California County of Los Angeles ~ On ~G ~ ~~ Z ~ c 2~ ~ ~ before me, Kevin Thomas Finnegan, Notary Public (insert name and title of the officer) personally appeared Brian Wilson who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. 5~~~~'r KEVIN THOMAS FINNEGAN ""'~`, Notary Public -California ~ ~~ Z ~ zYs~ - los Angeles County > ~~,;' Commission ~ 2236120 ~~u _ ~`' Signature ~ My Comm. Expires Mar 29, 2022 (Seal) SHEET 1 OF 2 EXHIBIT "A" ELECTRICAL EASEMENT LEGAL DESCRIPTION THOSE PORTIONS OF LOT 7 OF CERTIFICATE OF COMPLIANCE FOR LOT LINE ADJUSTMENT, IN THE CfTY OF VERNON, COUNTY OF LOS ANGELES, STATE OF CALIFORNIA, RECORDED FEBRUARY 05, 2019 AS INSTRUMENT NO. 20190106372 OF OFFICIAL RECORDS, !N THE OFFICE OF THE COUNTY RECORDER OF SAID COUNTY, DESCRIBED AS FOLLOWS: STRIP NO. 7: (6.00 FEET WJDE) BEING A STRIP OF LAND, 6.00 FEET IN WIDTH, LYING 3.00 FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: COMMENCING AT THE MOST WESTERLY CORNER OF PARCEL 2 OF THE LAND DESCRIBED 1N GRANT DEED TO THE CITY OF VERNON, RECORDED MAY 20, 2079 AS INSTRUMENT NO. 20190457939 OF SAID OFFICIAL RECORDS; THENCE WESTERLY ALONG THE NORTHERLY LINE OF SAID LOT 7, NORTH 82° 54' 23" WEST 25.20 FEET TO THE POINT OF BEGINNING; THENCE SOUTH 22° 54' 23"EAST 73.14 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERLY AND HAVING A RADIUS OF 5.00 FEET; THENCE SOUTHERLY ALONG SAID TANGENT CURVE, THROUGH A CENTRAL ANGLE OF 30° 00' 00", AN ARC LENGTH OF 2.62 FEET,' THENCE SOUTH 07° 05' 37" WEST 248.76 FEET, THENCE NORTH 82° 54' 23" WEST 7.79 FEET TO A POINT HEREINAFTER REFERRED TO AS POINT "A", SAID POINT ALSO BEING THE END POINT OF SAID CENTERLJNE OF STRIP IVO. 7. THE SIDELINES OF SAID STRIP SHALL BE PROLONGED OR SHORTENED TO TERMINATE NORTHERLY IN SAID NORTHERLY LINE. SHEET 2 OF 2 EXHIBIT "A" ELECTRICAL EASEMENT LEGAL DESCRIPTION STRlP NO. 2: (22.00 FEET WIDE) BEING A STRlP OF LAND, 22.00 FEET IN WlD7H, LYING 9.00 FEET NORTHERLY AND 13.00 FEET SOUTHERLY OF THE FOLLOWING DESCRIBED LINE: BEGINNING AT HERElNABOVE MENTIONED POINT "A';' THENCE NORTH 82° 54' 23"WEST 24.00 FEET TO THE END POINT OF STRIP NO. 2. EXCEPTING THEREFROM THAT POR710N OF LAND LYING WlTHlfV THE ABOVE DESCRIBED STRJP NO. 1. STRIP NO. 7 AND STRIP NO. 2 CONTAINING: 2,475 SQUARE FEET OR 0.057 ACRES MORE OR LESS. EXH/B!T "B"ATTACHED HERETO AND BY THIS REFERENCE MADE A PART HEREOF. SUBJECT TO: COVENANTS, CONDITIONS, RESTRICTlOIVS, RESERVATIONS, EASEMENTS, AND RIGHTS-OF-WAY, IF ANY PREPARED UNDER THE DIRECTION OF: • ~~~~~I BR1 N . TNI DATE P.L.S. No. 5 750 REG. EXP. 12/31/79 ~~p,L LANp~ ~~S~P~ ~• T yid ~,~ o ~ Z -< ~~ rno ~ m v, ~ * N0. 5750 ~~ ~Q 9TF pF ~ A~\F~~ 0 N'LY LINE nor ~ N EXHIBIT "B" ELECTRICAL EASEMENT ~~S TR/C T BOUL'E VA IUD C1 3' 3' cv 3' z 6' L POINT "q" — StRIF~.SN0. 2 I ~ I ~ , ~~ I ~~ owl N ~ DOS I W~~ I U p QW N a~ I 0 z~ ~z 5' f I SHEET 7 OF 7 SCALE: 1" = 50' LINE TABLE LINE # BEARING LENGTH L1 N 82'54'23" W 25.20' L2 S 22'54'23" E 73.14' L3 S 07'05'37" W 248.16' L4 N 82'54'23" W 1.79' L5 N 82'54'23" W 24.00' CURVE TABLE # DELTA RADIUS LENGTH C 1 30'0000" 5.00' 2.62' LEGEND.• /ND/GATES ELECTR/CAL EASEMENT TO THE CITY OF I/ERNON. CONTAINS• 2, 475 SQ. fT. 0.057 AC. f O Q PREPARED BY.• 0 O Thieves Enginee~inq, Inc. Q Cll~lL ENGINEERING • L4ND SURI/EY/NG 14349 FIRESTONE BOULEI/.4R0 Q L4 M/RAOA, C.4L./FORN/A 90638 Q' PH. (714J521-4811 FAX(714J521-4173 suRVEroR• PREPARED R T D/R CT/ON OF.• ~~~O~P~ ~T~/SGT o~\Q~ F `G" 2 -~ ~~ rno a~ ~~ ~~/~ ~ J, N0. 5750 ~ I /AN THIS ES DATE ~9 \~~Q~ P.L.S. NO. 5750 ~OF ~ A~ REG. EXP. DEC. 31, 2019 CERTIFICATE OF ACCEPTANCE (California Government Code Section 27281) This is to certify that interests in real property conveyed to or created in favor of the City of Vernon by that certain Electrical Easement dated October 21, 2019, executed by Bridge Point Vernon, LLC, a California limited liability company, is hereby accepted by the undersigned officer on behalf of the City pursuant to the authority conferred by Minute Order by the City Council of the City on December 3, 2019, and the grantee consents to recordation thereof by its duly authorized officer. Dated: _______________, 2019 CITY OF VERNON ________________________________ MELISSA YBARRA, Mayor ATTEST: LISA POPE, City Clerk APPROVED AS TO FORM: HEMA PATEL, City Attorney City Council Agenda Item Report Agenda Item No. COV-520-2019 Submitted by: Jessica Balandran Submitting Department: Public Utilities Meeting Date: December 3, 2019 SUBJECT Second Amendment to the Memorandum of Understanding for the Purposes of the National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit Requirements Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act ("CEQA") review, because it is an administrative and governmental fiscal activity which does not involve any commitment to any specific project and that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378. Furthermore, even if the proposed action were subject to CEQA review, the action is exempt in accordance with CEQA Guidelines § 15061(b)(3), the general rule that CEQA only applies to activities that may have a significant effect on the environment, for the reason that any construction that may occur in the future relying on this approval would be- and has been- subject to CEQA review at that time; B. Approve the Second Amendment to the Memorandum of Understanding (“MOU”) between the Los Angeles Gateway Regional Water Management Joint Powers Authority (“GWMA”) and the Cities of Bell, Bell Gardens, Commerce, Cudahy, Huntington Park, Maywood, Vernon and the Los Angeles County Flood Control District (“FCD”), (hereinafter collectively referred to as the “Watershed Permittees”) for an extension to the term of the MOU to update and continue implementing a Watershed Management Program (“WMP”) and Coordinated Integrated Monitoring Program (“CIMP”) as required by the Regional Water Quality Control Board, Los Angeles Region (“Regional Board”), National Pollutant Discharge Elimination System (“NPDES”) Municipal Separate Storm Sewer System (“MS4”) Permit Order No. R4-2012-0175 (hereinafter referred to as the “Second Amendment to the MOU”); and C. Authorize the City Administrator to execute the Second Amendment to the MOU with GWMA. Background: On November 8, 2012, the Regional Board approved the NPDES Permit for Waste Discharge Requirements for MS4 Discharges within the Coastal Watersheds of Los Angeles County, except those discharges originating from the City of Long Beach (hereinafter referred to as the “Municipal NPDES Permit”). The Regional Board staff commenced workshops for the new iteration of the Municipal NPDES Permit and expect it to be fully developed by the Spring of 2020. The Municipal NPDES Permit places an emphasis on coordination of resources and efforts between the Watershed Permittees. On April 16, 2013, the Vernon City Council authorized staff to participate in a WMP Plan and CIMP Plan in cooperation with neighboring Watershed Permittees known as the Los Angeles River Upper Reach 2 Watershed Management Area Cities ("LAR UR2 WMA Cities"). On June 4, 2013, the Vernon City Council approved an MOU with GWMA for the administration and cost sharing related to the development of the WMP and CIMP Plans under Resolution No. 2013-53 for an estimated cost of $135,000. The GWMA issued a Request for Proposals for this project and a contract was issued to CWE Corporation. Public Works Department staff worked rigorously with CWE Corporation to develop the WMP and draft CIMP plans. On December 9, 2014, the Vernon City Council approved the First Amendment to the MOU for the required implementation of the WMP and CIMP Plans. The purpose of the First Amendment to the MOU was to cooperatively support and undertake preparation of the WMP and CIMP Plans and any additional services, except for design and construction of the regional structural best management practices (BMP) projects and studies to determine if regional structural BMP projects outlined in the WMP Plan are feasible. Most recently, a new revenue source is now in place to cover related stormwater compliance costs since the Los Angeles County (“L.A. County”) Measure W passed in November 2018. Measure W imposes a special tax on parcels located within the Los Angeles County Flood Control District. The Municipal Program estimates $940,000 in annual revenue allocated to the City of Vernon beginning in this fiscal year. L.A. County will submit a Fund Transfer Agreement to the municipalities for execution in the next few months in order to receive the first payment of Municipal Program funds by April 2020. The submittal of annual progress/expenditure reports to L.A. County for all project related expenses will be required. The Second Amendment to the MOU is an extension to the term to update and continue implementing the WMP and CIMP Plans as required by the Regional Board, Municipal NPDES Permit. All other terms and conditions of the MOU and First Amendment shall remain in full force and effect. The Second Amendment to the MOU will extend the term through December 31, 2024. The City Attorney’s Office has reviewed and approved as to form the Second Amendment to the MOU. Fiscal Impact: Based on the Second Amendment to the MOU, the City of Vernon’s proportional share of costs is for an annual not-to-exceed amount of $100,000 for a 5-year term expiring on December 31, 2024. The City of Vernon’s share of Municipal Program funds will offset the cost of updating and implementing the WMP and CIMP Plans. Staff is also working with L.A. County to determine if there are any other eligible expenses. ATTACHMENTS 1. Second Amendment to the Memorandum of Understanding with GWMA Page 1 12664/0004/1767965-1 SECOND AMENDMENT TO THE MEMORANDUM OF UNDERSTANDING BETWEEN THE LOS ANGELES GATEWAY REGION INTEGRATED REGIONAL WATER MANAGEMENT JOINT POWERS AUTHORITY AND THE CITIES OF BELL, BELL GARDENS, COMMERCE, CUDAHY, HUNTINGTON PARK, MAYWOOD, VERNON, AND THE LOS ANGELES COUNTY FLOOD CONTROL DISTRICT TO EXTEND THE MOU’S TERM IN ORDER TO UPDATE AND CONTINUE IMPLEMENTING A WATERSHED MANAGEMENT PROGRAM (“WMP”) and COORDINATED INTEGRATED MONITORING PROGRAM (“CIMP”) AS REQUIRED BY THE REGIONAL WATER QUALITY CONTROL BOARD, LOS ANGELES REGION, NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM MUNICIPAL SEPARATE STORM SEWER SYSTEM PERMIT ORDER NO. R4-2012-0175 MUNICIPAL SEPARATE STORM SEWER SYSTEM, AS AMENDED (“MS4 PERMIT”) This SECOND AMENDMENT to the memorandum of understanding (“MOU”) is made and entered into as of the date of the last signature set forth below, by and between the Los Angeles Gateway Region Integrated Regional Water Management Joint Powers Authority (“GWMA”), a California Joint Powers Authority, and the Cities of Bell, Bell Gardens, Commerce, Cudahy, Huntington Park, Maywood, Vernon (“Cities”), and the Los Angeles Flood Control District (“LACFCD”): 1. Recitals. This SECOND AMENDMENT is made with the respect to the following facts and purposes: A. For the purposes of this Second Amendment, the term “Watershed Permittees” shall mean the Cities of Bell, Bell Gardens, Commerce, Cudahy, Huntington Park, Maywood, Vernon, and the Los Angeles County Flood Control District; and B. The Watershed Permittees and GWMA are collectively referred to as the “PARTIES”; and C. On August 19, 2013, the PARTIES entered into a Memorandum of Understanding for Administration and Cost Sharing to Prepare a Watershed Management Program (“WMP”) and Coordinated Integrated Monitoring Program (“CIMP”), collectively the “Plans,” as required by the Regional Water Quality Control Board, Los Angeles Region, National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit, Order No. R4-2012-0175 Municipal Separate Storm Sewer System, as amended (“MOU”); and D. The Watershed Permittees prepared and submitted the Plans to the Regional Board in compliance with certain elements of the MS4 Permit; and Page 2 12664/0004/1767965-1 E. On November 17, 2014, the PARTIES approved a First Amendment to the MOU to: (1) add implementation of the Plans to the scope and purpose of the MOU; and (2) provide a separate cost-share formula for the implementation of the Plans, subject to annual budget approval, in accordance with each PARTY’S cost share allocation; and F. The GWMA, on behalf of the Parties, has hired a consultant to implement the Plans for the benefit of the Parties; and G. The MOU is currently scheduled to expire on December 31, 2019. H. The Parties wish to extend the MOU’s term in order to maintain their existing beneficial relationship and cooperatively implement the Plans to comply with the MS4 Permit requirements with the support of GWMA’s consultant, including the process of updating the WMP and CIMP through adaptive management. The PARTIES agree that the following provisions of the MOU shall be amended as follows: 1. Section 6 of the MOU entitled “Term” is hereby amended to read as follows: “Section 6. Term. This MOU shall remain and continue in effect until December 31, 2024, unless sooner terminated as provided herein.” 2. Except for the changes specifically set forth herein, all other terms and conditions of the MOU and First Amendment shall remain in full force and effect. IN WITNESS WHEREOF, the Parties hereto have caused this SECOND AMENDMENT to be executed on their behalf, respectively, as follows: DATE: _____________________ LOS ANGELES GATEWAY REGION INTEGRATED REGIONAL WATER MANAGEMENT JOINT POWERS AUTHORITY _______________________________________ Lisa Rapp GWMA Chair Page 9 12664/0004/1767965-1 IN WITNESS WHEREOF, the Parties hereto have caused this SECOND AMENDMENT to be executed on their behalf, respectively, as follows: DATE: ____________________ CITY OF VERNON Mr. Carlos R. Fandino City Administrator 4305 Santa Fe Avenue Vernon, CA 90058 __________________________________________ Carlos R. Fandino, City Administrator ATTEST: APPROVED AS TO FORM: ____________________________ ______________________________________ ____________________________ ______________________________________ City Clerk City Attorney City Council Agenda Item Report Agenda Item No. COV-523-2019 Submitted by: Lisa Umeda Submitting Department: Public Utilities Meeting Date: December 3, 2019 SUBJECT Amendment No. 1 to the Services Agreement with CH2M Hill Engineers, Inc., for Environmental Support Services Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act (“CEQA”) review, because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines section 15378; B. Approve Amendment No. 1 to the Services Agreement ("Agreement") with CH2M Hill Engineers, Inc., in substantially the same form as submitted, to amend Exhibit C of the Agreement to accurately reflect the amount and allocation of funding needed to support the City with its environmental compliance needs during the remaining phases of the contract, with no increase in the total not-to-exceed contract amount; and C. Authorize the City Administrator to execute the Amendment No. 1 to the Agreement with CH2M Hill Engineers, Inc. with an effective date of December 3, 2019. Background: On May 11, 2017, Vernon Public Utilities (VPU) staff issued a Request for Proposals (RFP) for Environmental Support Services. On July 19, 2017, the City of Vernon entered into an agreement with CH2M Hill Engineers, Inc. (CH2M) for a three-year term in an amount not-to-exceed $1,777,462, expiring June 30, 2020. The original proposed total yielded a conservative budget, with consideration for rounding errors. The contracted services are divided into separate "Tasks" (labeled Task A, Task B, and Task C): •Task A - Environmental Compliance Support at $88,389 per year for three-year term contract with a three percent escalation after the first year. •Task B - Bright Star Canyon Wind Project Support $1,504,260 for services on as needed basis upon the written request of the City staff. •Task C - Calls for the Project Management of Task A and B. The costs have been accounted within Task A and B above, since the Project Management of Task A includes a three percent escalation after the first year which Project Management of Task B does not. There were a number of unforeseen costs for services rendered in association to Environmental Compliance Support (labeled as Task A) that require VPU to amend the contract allocation for the defined tasks. Firstly, there were administrative changes and updates needed to VPU's regulatory registration. CH2M assisted in coordinating the updates, which requires appropriate registration with compliance, engineering, and administrative departments of various regulatory bodies. Secondly and most importantly, the South Coast Air Quality Management District (SCAQMD) adopted their revised Air Quality Management Plan in March 2017 in order reduce NOx emissions five tons per day as soon as feasible but no later than 2025. The plan phases out the current market-based emissions reduction program, Regional Clean Air Incentives Market (RECLAIM) to a new command-and-control structure rule requiring Best Available Retrofit Control Technology (BARCT) level controls. VPU assets that the plan affects are two natural gas generators, RECLAIM Trading Credits (RTCs), and Emission Reduction Credits (ERCs). The generating units provide capacity to meet the California Independent System Operator (CAISO) local capacity requirements and offsetting costs of over $100,000 a year, and RTCs and ERCs are valued at over $1M on the City’s General Ledger. In order to ensure that VPU operations were not hindered by the changes, VPU staff, along with the support of CH2M, actively engaged with SCAQMD. CH2M assisted VPU staff in exempting the generators for the BARCT rule due to low use, and in devising a strategy to manage the RTCs in the changing market. California Air Resources Board (CARB) is currently revising its rules related to greenhouse gas (GHG) with high global warming potential. CH2M assisted in the analysis of the new rules in relation to VPU inventory, and assisted in strategizing future use to limit the impact of the new rule to VPU operations. The development of the new rule put additional scrutiny on the state’s current GHG inventory, and as a result CARB conducted an audit of VPU’s GHG inventory. The audit revealed that VPU reporting categories and inventory deviated from CARB’s current regulations. With the assistance of CH2M, VPU revised its reporting matrix and management procedures. The Vernon Water Department transferred into VPU in May 2017. Additionally, the California State Water Resources Control Board (Water Board) began implementation of an annual Water Loss Audit in October 2017. CH2M has assisted in preparing the Water Loss Audit, and per Water Board requirements is further validated by a certified CH2M auditor. Finally, SCAQMD performed an unannounced inspection of the Vernon-owned natural gas generators and requested information in connection with VPU’s original permits and the generators’ current configuration. CH2M assisted VPU staff in formulating responses to SCAQMD. The cost of services rendered to date for Task B remains significantly below the originally contracted amount. Section 9.10.3 of the agreement allows for a change, "to be made by a written amendment signed by Contractor and the City Administrator or other authorized representative of the City, subject to any requisite authorization by the City Council." The proposed Amendment No. 1 specifically revises the Schedule of Cost and Terms in Exhibit C of the Agreement. The revised cost allocation for the services of CH2M through June 30, 2020 (through the remaining term of the Agreement) is as follows: •Task A - Environmental Compliance Support (October 2019 - June 2020): $151,998 •Task B - Bright Star Canyon Wind Project Support (October 2019 - June 2020): $1,329,153 •Task C - Project Management (October 2019 - June 2020): $44,299 •Task A - Previously Paid Invoices (July 2017 - September 2020): $201,085 •Task B - Previously Paid Invoices (July 2017 - September 2020): $13,410 •Task C - Previously Paid Invoices (July 2017 - September 2020): $37,508 The proposed Amendment No. 1 has been approved as to form by the City Attorney's Office. VPU recommends that the City Council approve and authorize the City Administrator to execute Amendment No. 1 to the Services Agreement with CH2M Hill Engineers, Inc., for Environmental Support Services. Fiscal Impact: Although Amendment No. 1 calls for revisions to Exhibit C: Schedule, the total cost of services amounts to $1,777,453. Thus, there is no overall change to the not-to-exceed amount of $ 1,777,462.00 of the original Agreement. ATTACHMENTS 1. Amendment No. 1 with CH2M Hill Engineers, Inc. - 1 - AMENDMENT NO. 1 TO THE SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND CH2M HILL ENGINEERS, INC., FOR ENVIRONMENTAL SUPPORT SERVICES This Amendment (“Amendment No. 1”) to that certain Agreement for environmental support services dated July 1, 2017, (the “Agreement”), is made as of December 3, 2019, by and between the City of Vernon, a California charter city and municipal corporation (the “City”), and CH2M Hill Engineers, Inc., (“Contractor”), a Delaware corporation. WHEREAS, the City and Contractor are parties to a written Agreement, dated July 1, 2017, under which Contractor provides environmental support services to Vernon Public Utilities (“the Agreement”); and WHEREAS, the City and Contractor desire to amend the Agreement to amend Exhibit C of the Agreement to accurately reflect the amount and allocation of funding needed to support the City with its environmental compliance needs during the remaining phases of the contract. NOW, THEREFORE, the parties to this Amendment No. 1 agree as follows: 1. Effective as of December 3, 2019, Exhibit C of the Agreement, a copy which is attached hereto and fully incorporated herein by reference, is hereby amended. 2. Except as expressly modified by this Amendment No. 1, all provisions of the Agreement shall remain in full force and effect. 3. The provisions of this Amendment No. 1 shall constitute the entire agreement of the parties with respect to the subject matter included in this Amendment No. 1 and shall supersede any other agreement, understanding, or arrangement, whether written or oral, between the parties with respect to the subject matter of this Amendment No. 1. 4. The person or persons executing this Amendment No. 1 on behalf of each of the parties warrants and represents that he or she has the authority to execute this Amendment No. 1 on behalf of that party and has the authority to bind that party to the performance of its obligations hereunder. IN WITNESS WHEREOF, the parties have signed this Amendment No. 1 as of the date stated in the introductory clause. [SIGNATURES FOLLOW ON NEXT PAGE] - 2 - CITY OF VERNON a California charter city and municipal corporation By: ____________________________ Carlos Fandino, City Administrator CH2M Hill Engineers Inc., a Delaware corporation By: Name: Title: ATTEST: __________________________________ Lisa Pope, City Clerk By: Name: Title: APPROVED AS TO FORM: __________________________________ Zaynah Moussa, Senior Deputy City Attorney CH2M 1737 N. 1st Street, Suite 300 San Jose, CA 95112-4524 Tel 669.800.1012 www.ch2m.com SL0519171621SJC November 18, 2019 Ms. Lisa Umeda, Utilities Compliance Administrator City of Vernon Vernon Public Utilities 4305 Santa Fe Avenue Vernon, CA 90058 RE: Amended Costs and Terms for the Environmental Support Services Project Contract LP-0350 Dear Ms. Umeda: As requested, attached please find a revised Costs and Terms Sheet. This sheet has been extracted from the agreement between CH2M HILL Engineers, Inc. (CH2M) and the City of Vernon (City), Contract No. LP-0350, and revised to more accurately depict the amount of funding needed to support the City with its environmental compliance needs during the remainder of our contract.1 Funding has been reserved to provide as-needed permitting support for development of the Bright Star Canyon Wind Project (BSCWP), but has been reduced from what was originally proposed in 2017 to accommodate the increased funding needed for environmental compliance. As shown, the revised budget demonstrates that the total funding will not exceed $1,777,462, which is the amount previously authorized by the City. If you have any questions about this information, please contact me at (669) 800-1012 or Elyse.Engel@jacobs.com. Sincerely, CH2M HILL Engineers, Inc. Elyse Engel Patrick Kalita Project Manager Manager of Projects 1 The current contract between CH2M and the City is set to expire on June 30, 2020. SL0519171621SJC 2 CH2M will perform this work on a time-and-expenses not-to-exceed basis, under the terms and conditions of the contract between the City and CH2M. The cost estimate is based on the Scope of Work identified in the City’s RFP, assumptions stated in the proposal submitted to the City by CH2M, and based on increased compliance obligations in 2019 due to recent regulatory activity, which are expected to continue through the remainder of this contract period. If conditions change, the budget will be revised accordingly and resubmitted to the City. Actual costs to complete this work can be influenced by a variety of factors outside our control and may be more or less than estimated here. Our billing and expense rates for the 3-year term of this contract, which began in July 2017, are shown in Exhibit 1. Exhibit 2 provides CH2M’s budget for the project by task. These budgets will not be exceeded without prior written approval of the City. Exhibit 1. Labor Rate Schedule Labor Classification Hourly Billing Rate ($/Hour) 2017 2018 2019 2020 Principal 213 213 219 226 Senior Consultant/Scientist 202 202 208 214 Senior Engineer/Scientist 184 184 190 195 Lead Engineer/Scientist 167 167 172 177 Project Engineer/Scientist 139 139 143 147 Associate Engineer/Scientist 121 121 125 128 Staff Engineer/Scientist 104 104 107 110 Junior Engineer/Scientist 92 92 95 98 Senior Technician/Graphics/Drafting 104 104 107 110 Technician/Graphics/Drafting 92 92 95 98 Office/Clerical/Accounting 75 75 77 80 2017 rates are the same as those used under CH2M’s previous contract with the City, and were held constant through 2018. Rates have been subject to a 3 percent escalation per year, beginning in 2019. Exhibit 2. Proposed Budget Task Description Hours Labor Expense a Subs a Travel a Subtotal Task A – Environmental Compliance Support (October 2019 – June 2020) b A.1 Air Quality 839 $115,529 $0 $0 $1,000 $116,529 A.2 Potable/Recycled Water 1 $72 $0 $0 $0 $72 A.3 Hazardous Materials 7 $845 $0 $0 $0 $845 A.4 Greenhouse Gas 300 $34,552 $0 $0 $0 $34,552 Subtotal 1,147 $150,998 $0 $0 $1,000 $151,998 ENVIRONMENTAL SUPPORT SERVICES, CITY OF VERNON PUBLIC UTILITIES SL0519171621SJC 3 Task Description Hours Labor Expense a Subs a Travel a Subtotal Task B – BSCWP Support (October 2019 – June 2020) c B.1 Project Definition 208 $35,044 $28 $0 $471 $35,543 B.2 Pre-Application Agency & Data Coordination 244 $39,176 $2,046 $0 $850 $42,072 B.3.1a GOEA Nest & Aerial Raptor Surveys 164 $23,384 $1,028 $68,250 $1,450 $94,112 B.3.1b Focused Eagle Use Surveys 1,855 $175,355 $18,054 $1,260 $64,100 $258,769 B.3.2 Riparian Birds 300 $42,668 $92 $0 $1,900 $44,660 B.3.3 Condor Risk Assessment 264 $39,360 $83 $0 $0 $39,443 B.3.4 Desert Tortoise, Badger & Burrowing Owl Surveys 1,610 $175,500 $2,306 $0 $30,380 $208,186 B.3.5 Botanical Surveys 1,672 $206,617 $16,368 $0 $41,660 $264,645 B.3.6 Wetland Delineation 384 $56,734 $20,138 $0 $0 $76,872 B.3.7 Habitat Characterization 112 $16,120 $28 $0 $0 $16,148 B.4 Data Collection to Support Permitting 276 $45,622 $119 $0 $0 $45,741 B.5 Permit Planning & Support 483 $78,473 $83 $0 $0 $78,556 B.6 Environmental Review Process 60 $11,040 $0 $0 $0 $11,040 B.7 ESA Compliance 150 $23,640 $0 $0 $0 $23,640 B.8 GOEA Permitting/Bird & Bat Conservation 572 $80,276 $0 $9,450 $0 $89,726 Subtotal 8,354 $1,049,009 $60,373 $78,960 $140,811 $1,329,153 Task C – Project Management (October 2019 – June 2020) C.1 Compliance Management b 116 $18,055 $0 $0 $0 $18,055 C.2 BSCWP Management c 100 $26,225 $19 $0 $0 $26,244 Subtotal 216 $44,280 $19 $0 $0 $44,299 Invoices Previously Paid (July 2017 – September 2019) d 1,908 $250,448 $1,117 $0 $438 $252,003 Grand Total e 11,625 $1,494,735 $61,509 $78,960 $142,249 $1,777,453 Not-to-Exceed Contract Amount $1,777,462 a Expenses and travel will be billed at cost, except for automobile mileage, which will be billed at $0.54 per mile, or the established federal rate for that year. Subcontractor costs include a 5 percent mark-up. b Per the City’s request, these budgets reflect the amount of funding needed to deliver known tasks during the remainder of the contract period with contingency for compliance issues that may arise over time. These budgets are conservatively based on the 2020 labor rates shown in Exhibit 1. ENVIRONMENTAL SUPPORT SERVICES, CITY OF VERNON PUBLIC UTILITIES SL0519171621SJC 4 Task Description Hours Labor Expense a Subs a Travel a Subtotal c Per the City’s request, budget has been reserved for tasks associated with the BSCWP should questions or needs arise during the remainder of the contract period. However, these budgets have been reduced from what was originally proposed to account for charges already billed and to accommodate additional funding needed for tasks associated with ongoing environmental compliance. d This line item presents labor hours and labor, travel, and other expenses previously billed to and paid by the City for the period of July 2017 through September 2019. e The grand total presented here is slightly lower than that authorized by the City, and will not exceed that authorized by the City under any circumstance. City Council Agenda Item Report Agenda Item No. COV-506-2019 Submitted by: Adriana Ramos Submitting Department: Fire Department Meeting Date: December 3, 2019 SUBJECT Ratify the Execution of an Agreement to Accept Ownership of 12 Vehicles from Kia Motors America, Inc. for Vehicle Extrication Training Recommendation: A. Find that approval of the proposed donation is exempt under the California Environmental Quality Act (“CEQA”) review, because it is a government fiscal activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines section 15378; and B. Ratify execution of the Donation Acceptance Form and the Agreement, in substantially the same form as submitted, with Kia Motors America, Inc. for the donation of 12 new vehicles. Background: Over the past few years, Kia Motors America, Inc. (KMA) has donated vehicles to the Fire Department through the Rio Hondo Fire Academy for the department to use for vehicle extrication training. This year KMA would like to donate 12 brand new vehicles directly to the Fire Department for vehicle extrication training purposes. After the vehicles are dismantled, the parts will be picked up for recycling at no cost to the City. Acceptance of the proposed donation is a great opportunity for fire personnel to continue with their ongoing efforts to provide great service to the community. The Department will include in this training local Los Angeles County Battalions to provide a cohesive approach to the Department’s operations. In order to move forward with the donation, KMA requested for their agreement to be executed by the City before November 14th. City Council approval of the donation is required since the estimated value of the donation is over $100,000. To ensure the deadline was met, the City Administrator executed the Donation Acceptance Form and the Agreement on behalf of the City. Staff is now seeking to ratify the agreement with KMA for the donation of 12 new vehicles. The City Attorney’s office has reviewed and approved the agreement as to form. Fiscal Impact: None. ATTACHMENTS 1. Kia Motors America, Inc. - Donation Acceptance Form and Agreement to Accept Ownership of Vehicles CITY OF VERNON DONATION ACCEPTANCE FORM Name of Donor: Kia Motors America. Inc. Address: I I l Peters Canyon Rd City: Irvine State: CA Zip: 92606 Description of donation: 12 new vehicles Donor's estimate of current value: $1 50,000 Potential immediate or initial acquisition or installation cost,any on-going maintenance or replacement cost: None Intended use: Vehicle extrication training Conditions of acceptance or donor designation: None Remarks: New vehicles will be solely used for extrication training purposes only. City Department receiving donation: Fire Department APPROVED/DISAPPROVED Amod. 7 Lu Date partment He Sign ure 7 - / Ai),"! G Date City Ator Signature (if re.41 d) Date Submitted to City Council (if required) Date Approved by City Council(if required) Date Mayor Signature(if required) The original signed version of this form shall be retained by the City Clerk. A copy shall be submitted to(1)the City Administrator; (2) Finance Department;and (3)the affected department, if any. CID KIA MOTORS AMERICA, INC. AGREEMENT TO ACCEPT OWNERSHIP OF VEHICLE FEIN:33-0539850 Organization: Vernon Fire Department Address: 4305 Santa Fe Avenue Vernon,CA 90058 FEIN: 95-60008008 Description of vehicles: Kia Motors America Prototype Vehicles VIN: VIN MY TYPE KNDCB3LC4H5016618 2017 Niro HEV LX P2 KNDCC3LD2H5047470 2017 Niro PHEV KNDCC3LD3H5047476 2017 Niro PHEV P2 KNDCC3LD5H5047477 2017 Niro PHEV P2 KNDME5C14J6397621 2018 SEDONA KNDMC5C17J6397635 2018 SEDONA KNAE55LC7J6000406 2018 Stinger KNAE55LC0J6000408 2018 Stinger 3KPF24AD7JE000146 2018 Forte LX 5XXGT4L34KG255996 2019 Optima LX LP2 5XXGT4L38KG255998 2019 Optima S LP2 SXXGT4L30KG256000 2019 Optima S LP2 Terms of Agreement relating to use and disposition ofabove identified vehicle("Vehicle"). Said organization hereby agrees to accept ownership of the Vehicle listed above without payment of any goods or services in consideration,and limit use of such vehicle to training purposes only for its organization. The organization further agrees that no attempt will be made to register the Vehicle with the Department of Motor Vehicles,drive said Vehicle on public roads,salvage any parts,or sell the Vehicle except as set forth below. The organization has been informed and it acknowledges that such use may be a violation of state and federal laws,regulations,or prohibitions. The organization acknowledges that the Vehicle is equipped with a full set of airbags,seat belt pre-tensioners,and an electric vehicle battery, and the organization agrees to properly dispose of such items,along with any other part of the Vehicle,in accordance with any applicable laws and regulations. The organization understands that said vehicle is considered a prototype, is no longer in use,and has been retired by Kia Motors America, Inc.("KMA"). The estimated time period said organization will utilize this vehicle will be no longer than six months from the date indicated below. To the fullest extent allowed by law,the organization agrees to WAIVE, DISCHARGE CLAIMS,AND RELEASE FROM LIABILITY KMA,its officers,directors,employees,agents,and leaders from any and all liability on account of, or in any way resulting from injuries and damages in any way connected with,related to,or arising from the transfer of ownership of the Vehicle,and the use and disposal of the Vehicle. The organization expressly waives any obligations and claims,whether known or unknown,and specifically and expressly waives those obligations and claims that are reserved pursuant to California Civil Code Section 1542: 1 A general release does not extend to claims which the creditor does not know or suspect to exist in his or her favor at the time of executing the release,which if known by him or her must have materially affected his or his/her settlement with the debtor. It is further agreed and understood that the organization will protect,indemnify and save harmless KMA from any valid claims or liens arising from the failure of the organization to keep the vehicle from being driven or related in any way to the organizations failure to meet its obligations as required by this agreement The organization hereby agrees to limit any subsequent transfer of the Vehicle solely to parties who agree to either crush or otherwise destroy said Vehicle,and to specifically exclude the transfer to parties who the organization can reasonably assume would attempt to salvage any parts. The organization will notify the person named below once it destroys or transfers the Vehicle and will have the Vehicle Identification Number Plate removed from said Vehicle and returned to KMA. Kia Motors America. Inc. I I I Peters canyon Road Irvine,CA 92606 949)468-4640 I have read this document in its entirety and freely and voluntarily agree to all conditions of this transfer. I agree to accept the Vehicle. Signature of organizations representative: d C, Title: City Administrator Date: 1/-, ATTEST: Lisa Pope,City Cle APPROVED AS TO FORM: Za oussa,Senior Deputy City Attorney City Council Agenda Item Report Agenda Item No. COV-524-2019 Submitted by: Eva Muro Submitting Department: City Attorney Meeting Date: December 3, 2019 SUBJECT Approval of Amendment No. 1 to the Attorney Services Agreement (Litigation) Between the City of Vernon and Burke, Williams & Sorensen, LLP for Specialized Outside Legal Services Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act (“CEQA”) review, because it is a continuing administrative and fiscal activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines section 15378; B. Approve Amendment No. 1 to the Attorney Services Agreement (Litigation) with Burke, Williams & Sorensen, LLP (“Burke Williams”), in substantially the same form as submitted, to increase the total not-to-exceed amount by an additional $150,000.00; and C. Authorize the City Administrator to execute Amendment No. 1 to the Attorney Services Agreement (Litigation) with Burke Williams with an effective date of December 3, 2019. Background: On May 21, 2019, the City Administrator approved an Attorney Services Agreement (Litigation) for specialized outside legal services with Burke Williams for a three-year term beginning May 20, 2019 through May 19, 2022, and a total not-to-exceed amount of $100,000. Burke Williams was selected after a comprehensive competitive selection process, in accordance with City procedures and good governance contracting principles. On or about February 13, 2019, the City Attorney’s Office issued a Request for Proposals for Specialized Outside Legal Services. After scoring highly in the screening and ranking process, which included positive past performance on City matters, Burke Williams was selected for specialized litigation and/or advisory matters. In light of the ongoing litigation of several matters assigned to Burke Williams, including multiple dangerous condition of public property lawsuits currently alleged against the City which require extensive discovery and motion practice, staff is requesting authority to enter into Amendment No. 1, which maintains all existing terms under the current Agreement and increases the total not-to-exceed amount by $150,000.00, bringing the total three-year contract amount to $250,000.00. Fiscal Impact: The maximum fiscal impact to the City under the existing contract term, including the proposed Amendment No. 1, is $250,000.00. This amount has been included in the budget for the City Attorney’s Office for fiscal year 2019-2020 and will be budgeted accordingly in subsequent years. ATTACHMENTS 1. Amendment No. 1 - Burke, Williams and Sorensen - 1 - AMENDMENT NO. 1 TO THE ATTORNEY SERVICES AGREEMENT (LITIGATION) BETWEEN THE CITY OF VERNON AND BURKE, WILLIAMS & SORENSEN, LLP FOR SPECIALIZED OUTSIDE LEGAL SERVICES This Amendment (“Amendment No. 1”) to that certain Agreement for specialized legal services dated May 20, 2019, (the “Agreement”), is made as of December 3, 2019, by and between the City of Vernon, a California charter city and municipal corporation (the “City”), and Burke, Williams & Sorensen, LLP (“Associate Counsel”), a limited liability partnership. WHEREAS, the City and Associate Counsel are parties to a written Agreement dated May 20, 2019, under which Associate Counsel assist the City Attorney’s Office in various specialized litigation and/or advisory matters from time to time on an as needed basis; and WHEREAS, the City and Associate Counsel desire to amend the Agreement to increase the total not to exceed amount by an additional $150,000.00. NOW, THEREFORE, the parties to this Amendment No. 1 agree as follows: 1. Effective as of December 3, 2019, the total amount not to exceed for the period of May 20, 2019 through May 19, 2022 shall not exceed a total amount of $250,000.00. 2. Except as expressly modified by this Amendment No. 1, all provisions of the Agreement shall remain in full force and effect. 3. The provisions of this Amendment No. 1 shall constitute the entire agreement of the parties with respect to the subject matter included in this Amendment No. 1 and shall supersede any other agreement, understanding, or arrangement, whether written or oral, between the parties with respect to the subject matter of this Amendment No. 1, with the exception of joint representation and/or conflict waiver agreements related to matters handled by Associate Counsel. 4. The person or persons executing this Amendment No. 1 on behalf of each of the parties warrants and represents that he or she has the authority to execute this Amendment No. 1 on behalf of that party and has the authority to bind that party to the performance of its obligations hereunder. IN WITNESS WHEREOF, the parties have signed this Amendment No. 1 as of the date stated in the introductory clause. [SIGNATURES FOLLOW ON NEXT PAGE] - 2 - CITY OF VERNON, a California charter city and municipal corporation By: ____________________________ Carlos Fandino, City Administrator Burke, Williams & Sorensen, LLP, a limited liability partnership By: Name: Title: ATTEST: __________________________________ Lisa Pope, City Clerk By: Name: Title: APPROVED AS TO FORM: __________________________________ Zaynah Moussa, Senior Deputy City Attorney City Council Agenda Item Report Agenda Item No. COV-495-2019 Submitted by: Veronica Petrosyan Submitting Department: Health and Environmental Control Department Meeting Date: December 3, 2019 SUBJECT Award of a Services Agreement to Industrial Environmental Association (IEA) to provide Environmental Compliance, Outreach, Training, and Education Services Recommendation: A. Find that approval of the proposed action is exempt under the California Environmental Quality Act (CEQA), because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378; B. Approve the Services Agreement with Industrial Environmental Association (IEA), in substantially the same form as submitted, to provide environmental compliance outreach, training, and education services for a period of three years and an amount not-to-exceed $150,000; and C. Authorize the City Administrator to execute the proposed Services Agreement with IEA with an effective date of December 1, 2019. Background: The Department of Health and Environmental Control (DHEC) has identified a continued need to provide environmental compliance, outreach, training and education services to augment the City’s many “service offerings” to companies opting to conduct business within City limits. The DHEC has determined that hiring an environmental consulting firm with the subject matter expertise is a cost effective means to provide these important services. On May 17, 2018, the City contracted with Industrial Environmental Association (IEA) to perform these services; however, the contract has since expired after being in place for one year. Pursuant to Vernon Municipal Codes Section 2.17.12, the DHEC publicized the Request for Proposal (RFP) for Environmental Compliance, Outreach, Training, and Education Services as the cost for the service over a three year period was anticipated to exceed $50,000. The DHEC received three (3) proposals from qualified firms which were rated on their experience, overall cost, feedback from references, and responsiveness to the RFP. After thorough consideration, IEA was selected as the most qualified firm based upon the collective rating calculated by Department staff. Therefore, the DHEC recommends that the City execute a Services Agreement with IEA to provide environmental compliance, outreach, training and education services for a three (3) year term. The contract has been reviewed and approved as to form by the Office of the City Attorney. Fiscal Impact: The proposed amount for the Services Agreement with IEA is not-to-exceed $50,000 per year, with a grand total amount not-to-exceed of $150,000 over the three (3) year term of the agreement. DHEC has budgeted $50,000 for professional services for fiscal year 2019-2020 and will budget for this expense accordingly in the subsequent two fiscal years. ATTACHMENTS 1. Services Agreement with Industrial Environmental Association 1 SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND INDUSTRIAL ENVIRONMENTAL ASSOCIATION FOR ENVIRONMENTAL COMPLIANCE, OUTREACH, TRAINING AND EDUCATION SERVICES COVER PAGE Contractor: Industrial Environmental Association (IEA) Responsible Principal of Contractor: Jack Monger, Chief Executive Officer (CEO) Notice Information - Contractor: IEA 1330 Orange Avenue, Suite 100 Coronado, CA 92118 Attention: Jack Monger, CEO Phone: 619-522-9000 Notice Information - City: City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Attention: Freddie Agyin, Director of Health & Environmental Control Telephone: (323) 583-8811 ext. 840 Commencement Date: December 1, 2019 Termination Date: November 30, 2022 Consideration: Total not to exceed $150,000.00 (includes all applicable sales tax); and more particularly described in Exhibit C Records Retention Period Three (3) years, pursuant to Section 11.20 2 SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND INDUSTRIAL ENVIRONMENTAL ASSOCIATION FOR ENVIRONMENTAL COMPLIANCE, OUTREACH, TRAINING AND EDUCATION SERVICES This Contract is made between the City of Vernon ("City"), a California charter City and California municipal corporation (“City”), and Industrial Environmental Association, a California corporation (“Contractor”). The City and Contractor agree as follows: 1.0 EMPLOYMENT OF CONTRACTOR. City agrees to engage Contractor to perform the services as hereinafter set forth as authorized by the City Council on December 3, 2019. 2.0 SCOPE OF SERVICES. 2.1 Contractor shall perform all work necessary to complete the services set forth in the Request for Proposals issued on or before September 26, 2019, Exhibit “A”, and Contractor's proposal to the City ("Proposal") dated October 7, 2019, Exhibit “B”, both of which are attached to and incorporated into this Contract, by reference. 2.2 All services shall be performed to the satisfaction of City. 2.3 All services shall be performed in a competent, professional, and satisfactory manner in accordance with the prevailing industry standards for such services. 3.0 PERSONNEL. 3.1 Contractor represents that it employs, or will employ, at its own expense, all personnel required to perform the services under this Contract. 3.2 Contractor shall not subcontract any services to be performed by it under this Contract without prior written approval of City. 3.3 All of the services required hereunder will be performed by Contractor or by City-approved subcontractors. Contractor, and all personnel engaged in the work, shall be fully qualified and authorized or permitted under State and local law to perform such services and shall be subject to approval by the City. 3 4.0 TERM. The Contractor shall commence the delivery of services on receipt of a written notice to proceed and shall complete the services on the schedule set forth in Exhibit “C”. 5.0 COMPENSATION AND FEES. 5.1 Contractor has established rates for the City of Vernon which are comparable to and do not exceed the best rates offered to other governmental entities in and around Los Angeles County for the same services. For satisfactory and timely performance of the services, the City will pay Contractor in accordance with the payment schedule set forth in Exhibit “C” attached hereto and incorporated herein by reference. 5.2 Contractor's grand total compensation for the entire term of this Contract, shall not exceed $150,000.00 without the prior authorization of the City, as appropriate, and written amendment of this Contract. 5.3 Contractor shall, at its sole cost and expense, furnish all necessary and incidental labor, material, supplies, facilities, equipment, and transportation which may be required for furnishing services pursuant to this Contract. Materials shall be of the highest quality. The above Contract fee shall include all staff time and all clerical, administrative, overhead, insurance, reproduction, telephone, air travel, auto rental, subsistence, and all related costs and expenses. 5.4 City shall reimburse Contractor only for those costs or expenses specifically approved in this Agreement, or specifically approved in writing in advance by City. Unless otherwise approved, such costs shall be limited and include nothing more than the following costs incurred by Contractor: 5.4.1 The actual costs of subcontractors for performance of any of the services that Contractor agrees to render pursuant to this Agreement, which have been approved in advance by City and awarded in accordance with this Agreement. 5.4.2 Approved reproduction charges. 4 5.4.3 Actual costs and/or other costs and/or payments specifically authorized in advance in writing and incurred by Contractor in the performance of this Agreement. 5.5 Contractor shall not receive any compensation for extra work performed without the prior written authorization of City. As used herein, “extra work” means any work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did not reasonably anticipate would be necessary at the time of execution of this Agreement. Compensation for any authorized extra work shall be paid in accordance with the payment schedule as set forth in Exhibit “C,” if the extra work has been approved by the City. 5.6 Licenses, Permits, Fees, and Assessments. Contractor shall obtain, at Contractor’s sole cost and expense, such licenses, permits, and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and which arise from or are necessary for the performance of the Services by this Agreement. 6.0 PAYMENT. 6.1 As scheduled services are completed, Contractor shall submit to the City an invoice for the services completed, authorized expenses, and authorized extra work actually performed or incurred according to said schedule. 6.2 Each such invoice shall state the basis for the amount invoiced, including a detailed description of the services completed, the number of hours spent, reimbursable expenses incurred and any extra work performed. 6.3 Contractor shall also submit a progress report with each invoice that describes in reasonable detail the services and the extra work, if any, performed in the immediately preceding calendar month. 5 6.4 Contractor understands and agrees that invoices which lack sufficient detail to measure performance will be returned and not processed for payment. 6.5 City will pay Contractor the amount invoiced within thirty (30) days after the City approves the invoice. 6.6 Payment of such invoices shall be payment in full for all services, authorized costs, and authorized extra work covered by that invoice. 7.0 CITY'S RESPONSIBILITY. City shall cooperate with Contractor as may be reasonably necessary for Contractor to perform its services; and will give any required decisions as promptly as practicable so as to avoid unreasonable delay in the progress of Contractor's services. 8.0 COORDINATION OF SERVICES. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City’s staff, consultants, and other staff at all reasonable times. 9.0 INDEMNITY. Contractor agrees to indemnify City, its officers, elected officials, employees and agents against, and will hold and save each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities (herein “claims or liabilities”), including but not limited to professional negligence, that may be asserted or claimed by any person, firm or entity arising out of or in connection with the work, operations or activities of Contractor, its agents, employees, subcontractors, or invitees, provided for herein, or arising from the acts or omissions of Contractor hereunder, or arising from Contractor’s performance of or failure to perform any term, provision, covenant or condition of this Agreement, except to the extent such claims or liabilities arise from the gross negligence or willful misconduct of City, its officers, elected officials, agents or employees. 10.0 INSURANCE. Contractor shall, at its own expense, procure and maintain policies of insurance of the types and in the amounts set forth below, for the duration of the Contract, including any extensions thereto. The policies shall state that they afford primary 6 coverage. i. Automobile Liability with minimum limits of at least $1,000,000 combined single limit, including owned, hired, and non-owned liability coverage. ii. Contractor agrees to subrogate automobile liability resulting from performance under this agreement by agreeing to defend, indemnify and hold harmless, the City, and its respective employees, agents, and City Council from and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney’s fees (“Claims”), which are attributable to any act or omission by the City under the performance of the services. iii. General Liability with minimum limits of at least $1,000,000 per occurrence and $2,000,000 aggregate written on an Insurance Services Office (ISO) Comprehensive General Liability "occurrence" form or its equivalent for coverage on an occurrence basis. Premises/Operations and Personal Injury coverage is required. The City of Vernon, its directors, commissioners, officers, employees, agents, and volunteers must be endorsed on the policy as additional insureds as respects liability arising out of the Contractor's performance of this Contract. (1) If Contractor employs other contractors as part of the services rendered, Contractor's Protective Coverage is required. Contractor may include all subcontractors as insureds under its own policy or shall furnish separate insurance for each subcontractor, meeting the requirements set forth herein. (2) Contractor agrees to subrogate General Liability resulting from performance under this agreement by agreeing to defend, indemnify and hold harmless, the City, and its respective employees, agents, and City Council from and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney’s fees (“Claims”), which are attributable to any act or omission by the City under 7 the performance of the services. iv. Professional Errors and Omissions coverage in a sum of at least $1,000,000, where such risk is applicable. Applicable aggregates must be identified and claims history provided to determine amounts remaining under the aggregate. Contractor shall maintain such coverage for at least one (1) year after the termination of this Agreement. v. Contractor shall comply with the applicable sections of the California Labor Code concerning workers' compensation for injuries on the job. In addition, Contractor shall require each subcontractor to similarly maintain workers’ compensation insurance in accordance with the laws for California for all of the subcontractor’s employees. Compliance is accomplished in one of the following manners: (1) Provide copy of permissive self-insurance certificate approved by the State of California; or (2) Secure and maintain in force a policy of workers' compensation insurance with statutory limits and Employer's Liability Insurance with a minimal limit of $1,000,000 per accident. The policy shall be endorsed to waive all rights of subrogation against City, its directors, commissioners, officers, employees, and volunteers for losses arising from performance of this Contract; or (3) Provide a "waiver" form certifying that no employees subject to the Labor Code's Workers' Compensation provision will be used in performance of this Contract. vi. Each insurance policy included in this clause shall be endorsed to state that coverage shall not be cancelled except after thirty (30) days' prior written notice to City. vii. Insurance shall be placed with insurers with a Best's rating of no less than A-VIII. viii. Prior to commencement of performance, Contractor shall furnish City with a certificate of insurance for each policy. Each certificate is to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificate(s) must be in a form approved by 8 City. City may require complete, certified copies of any or all policies at any time. ix. Failure to maintain required insurance at all times shall constitute a default and material breach. In such event, Contractor shall immediately notify City and cease all performance under this Contract until further directed by the City. In the absence of satisfactory insurance coverage, City may, at its option: (a) procure insurance with collection rights for premiums, attorney's fees and costs against Contractor by way of set-off or recoupment from sums due to Contractor, at City's option; (b) immediately terminate this Contract and seek damages from the Contract resulting from said breach; or (c) self-insure the risk, with all damages and costs incurred, by judgment, settlement or otherwise, including attorney's fees and costs, being collectible from Contractor, by way of set-off or recoupment from any sums due to Contractor. 11.0 GENERAL TERMS AND CONDITIONS. 11.1 INDEPENDENT CONTRACTOR. 11.1.1 It is understood that in the performance of the services herein provided for, Contractor shall be, and is, an independent contractor, and is not an agent, officer or employee of City and shall furnish such services in its own manner and method except as required by this Contract, or any applicable statute, rule, or regulation. Further, Contractor has and shall retain the right to exercise full control over the employment, direction, compensation and discharge of all persons employed by Contractor in the performance of the services hereunder. City assumes no liability for Contractor’s actions and performance, nor assumes responsibility for taxes, bonds, payments, or other commitments, implied or explicit, by or for Contractor. Contractor shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment of its employees, subcontractors and independent contractors, including compliance with social security, withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever. 11.1.2 Contractor acknowledges that Contractor and any subcontractors, 9 agents or employees employed by Contractor shall not, under any circumstances, be considered employees of the City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits. 11.2 CONTRACTOR NOT AGENT. Except as the City may authorize in writing, Contractor and its subcontractors shall have no authority, express or implied, to act on behalf of or bind the City in any capacity whatsoever as agents or otherwise. 11.3 OWNERSHIP OF WORK. All documents and materials furnished by the City to Contractor shall remain the property of the City and shall be returned to the City upon termination of this Agreement. All reports, drawings, plans, specifications, computer tapes, floppy disks and printouts, studies, memoranda, computation sheets, and other documents prepared by Contractor in furtherance of the work shall be the sole property of City and shall be delivered to City whenever requested at no additional cost to the City. Contractor shall keep such documents and materials on file and available for audit by the City for at least three (3) years after completion or earlier termination of this Contract. Contractor may make duplicate copies of such materials and documents for its own files or for such other purposes as may be authorized in writing by the City. 11.4 CORRECTION OF WORK. Contractor shall promptly correct any defective, inaccurate or incomplete tasks, deliverables, goods, services and other work, without additional cost to the City. The performance or acceptance of services furnished by Contractor shall not relieve the Contractor from the obligation to correct subsequently discovered defects, inaccuracy, or incompleteness. 11.5 RESPONSIBILITY FOR ERRORS. Contractor shall be responsible for its work and results under this Agreement. Contractor, when requested, shall furnish clarification and/or explanation as may be required by the City, regarding any services rendered under this Agreement at no additional cost to City. In the event that an error or omission attributable to 10 Contractor occurs, then Contractor shall, at no cost to City, provide all necessary design drawings, estimates and other Contractor professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction. 11.6 WAIVER. The City's waiver of any term, condition, breach, or default of this Contract shall not be considered to be a waiver of any other term, condition, default or breach, nor of a subsequent breach of the one waived. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought. 11.7 SUCCESSORS. This Contract shall inure to the benefit of, and shall be binding upon, the parties hereto and their respective heirs, successors, and/or assigns. 11.8 NO ASSIGNMENT. Contractor shall not assign or transfer this Contract or any rights hereunder without the prior written consent of the City and approval by the City Attorney, which may be withheld in the City's sole discretion. Any unauthorized assignment or transfer shall be null and void and shall constitute a material breach by the Contractor of its obligations under this Contract. No assignment shall release the original parties from their obligations or otherwise constitute a novation. 11.9 COMPLIANCE WITH LAWS. Contractor shall comply with all Federal, State, County and City laws, ordinances, rules and regulations, which are, as amended from time to time, incorporated herein and applicable to the performance hereof, including but without limitation, the Vernon Living Wage Ordinance. Violation of any law material to performance of this Contract shall entitle the City to terminate the Contract and otherwise pursue its remedies. Further, if the Contractor performs any work knowing it to be contrary to such laws, rules, and regulations Contractor shall be solely responsible for all costs arising therefrom. 11 11.10 ATTORNEY'S FEES. If any action at law or in equity is brought to enforce or interpret the terms of this Contract, the prevailing party shall be entitled to reasonable attorney's fees, costs, and necessary disbursements in addition to any other relief to which such party may be entitled. 11.11 INTERPRETATION. 11.11.1 Applicable Law. This Contract shall be deemed a contract and shall be governed by and construed in accordance with the laws of the State of California. Contractor agrees that the State and Federal courts which sit in the State of California shall have exclusive jurisdiction over all controversies and disputes arising hereunder, and submits to the jurisdiction thereof. 11.11.2 Entire Agreement. This Contract, including any exhibits attached hereto, constitutes the entire agreement and understanding between the parties regarding its subject matter and supersedes all prior or contemporaneous negotiations, representations, understandings, correspondence, documentation, and agreements (written or oral). 11.11.3 Written Amendment. This Contract may only be changed by written amendment signed by Contractor and the City Administrator or other authorized representative of the City, subject to any requisite authorization by the City Council. Any oral representations or modifications concerning this Contract shall be of no force or effect. 11.11.4 Severability. If any provision in this Contract is held by any court of competent jurisdiction to be invalid, illegal, void, or unenforceable, such portion shall be deemed severed from this Contract, and the remaining provisions shall nevertheless continue in full force and effect as fully as though such invalid, illegal, or unenforceable portion had never been part of this Contract. 11.11.5 Order of Precedence. In case of conflict between the terms of this Contract and the terms contained in any document attached as an Exhibit or otherwise 12 incorporated by reference, the terms of this Contract shall strictly prevail. The terms of the City’s Request for Proposals shall control over the Contractor’s Proposal. 11.11.6 Duplicate Originals. There shall be two (2) fully signed copies of this Contract, each of which shall be deemed an original. 11.11.7 Construction. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement. 11.12 TIME OF ESSENCE. Time is strictly of the essence of this contract and each and every covenant, term, and provision hereof. 11.13 AUTHORITY OF CONTRACTOR. The Contractor hereby represents and warrants to the City that the Contractor has the right, power, legal capacity, and authority to enter into and perform its obligations under this Contract, and its execution of this Contract has been duly authorized. 11.14 ARBITRATION OF DISPUTES. Any dispute for under $25,000 arising out of or relating to the negotiation, construction, performance, non-performance, breach, or any other aspect of this Contract, shall be settled by binding arbitration in accordance with the Commercial Rules of the American Arbitration Association at Los Angeles, California and judgment upon the award rendered by the Arbitrators may be entered in any court having jurisdiction thereof. The City does not waive its right to object to the timeliness or sufficiency of any claim filed or required to be filed against the City and reserves the right to conduct full discovery. 11.15 NOTICES. Any notice or demand to be given by one party to the other must be given in writing and by personal delivery or prepaid first-class, registered or certified mail, addressed as follows. Notice simply to the City of Vernon or any other City department is not adequate notice. 13 If to the City: City of Vernon Attention: Freddie Agyin, Director of Health & Environmental Control 4305 Santa Fe Avenue Vernon, CA 90058 If to the Contractor: Industrial Environmental Association Attention: Jack Monger, CEO 1330 Orange Avenue, Suite 100 Coronado, CA 92118 Any such notice shall be deemed to have been given upon delivery, if personally delivered, or, if mailed, upon receipt, or upon expiration of three (3) business days from the date of posting, whichever is earlier. Either party may change the address at which it desires to receive notice upon giving written notice of such request to the other party. 11.16 NO THIRD PARTY RIGHTS. This Agreement is entered into for the sole benefit of City and Contractor and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right or remedy in, under, or to this Agreement. 11.17 TERMINATION FOR CONVENIENCE (Without Cause). City may terminate this Contract in whole or in part at any time, for any cause or without cause, upon fifteen (15) calendar days' written notice to Contractor. If the Contract is thus terminated by City for reasons other than Contractor's failure to perform its obligations, City shall pay Contractor a prorated amount based on the services satisfactorily completed and accepted prior to the effective date of termination. Such payment shall be Contractor's exclusive remedy for termination without cause. 11.18 DEFAULT. In the event either party materially defaults in its obligations hereunder, the other party may declare a default and terminate this Contract by written notice to 14 the defaulting party. The notice shall specify the basis for the default. The Contract shall terminate unless such default is cured before the effective date of termination stated in such notice, which date shall be no sooner than ten (10) days after the date of the notice. In case of default by Contractor, the City reserves the right to procure the goods or services from other sources and to hold the Contractor responsible for any excess costs occasioned to the City thereby. Contractor shall not be held accountable for additional costs incurred due to delay or default as a result of Force Majeure. Contractor must notify the City immediately upon knowing that non-performance or delay will apply to this Contract as a result of Force Majeure. At that time Contractor is to submit in writing a Recovery Plan for this Contract. If the Recovery Plan is not acceptable to the City or not received within 10 days of the necessary notification of Force Majeure default, then the city may cancel this order in its entirety at no cost to the City, owing only for goods and services completed to that point. 11.19 TERMINATION FOR CAUSE. Termination for cause shall relieve the terminating party of further liability or responsibility under this Contract, including the payment of money, except for payment for services satisfactorily and timely performed prior to the service of the notice of termination, and except for reimbursement of (1) any payments made by the City for service not subsequently performed in a timely and satisfactory manner, and (2) costs incurred by the City in obtaining substitute performance. If this Agreement is terminated as provided herein, City may require, at no additional cost to City, that Contractor provide all finished or unfinished documents, data, and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request. 11.19.1 Additional Services. In the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. 11.20 MAINTENANCE AND INSPECTION OF RECORDS. 15 The City, or its authorized auditors or representatives, shall have access to and the right to audit and reproduce any of the Contractor's records to the extent the City deems necessary to insure it is receiving all money to which it is entitled under the Contract and/or is paying only the amounts to which Contractor is properly entitled under the Contract or for other purposes relating to the Contract. The Contractor shall maintain and preserve all such records for a period of at least three (3) years after termination of the Contract. The Contractor shall maintain all such records in the City of Vernon. If not, the Contractor shall, upon request, promptly deliver the records to the City of Vernon or reimburse the City for all reasonable and extra costs incurred in conducting the audit at a location other than the City of Vernon, including, but not limited to, such additional (out of the City) expenses for personnel, salaries, private auditors, travel, lodging, meals, and overhead. 11.21 CONFLICT. Contractor hereby represents, warrants, and certifies that no member, officer, or employee of the Contractor is a director, officer, or employee of the City of Vernon, or a member of any of its boards, commissions, or committees, except to the extent permitted by law. 11.22 HEADINGS. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement. 11.23 ENFORCEMENT OF WAGE AND HOUR LAWS. Eight hours labor constitutes a legal day's work. The Contractor, or subcontractor, if any, shall forfeit twenty-five dollars ($25) for each worker employed in the execution of this Agreement by the respective Contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Sections 1810 through 1815 of the California Labor Code as a penalty paid to the City; provided, however, work performed by employees of contractors in 16 excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon compensation for all hours worked in excess of 8 hours per day at not less than 1½ times the basic rate of pay. 11.24 LIVING WAGES Contractor, and any Subcontractor(s), shall comply with the City’s Living Wage Ordinance. The current Living Wage Standards are set forth in Exhibit “D”. Upon the City’s request, certified payroll records shall promptly be provided to the City. 11.25 EQUAL EMPLOYMENT OPPORTUNITY PRACTICES. Contractor certifies and represents that, during the performance of this Contract, it and any other parties with whom it may subcontract shall adhere to equal employment opportunity practices to assure that applicants, employees and recipients of service are treated equally and are not discriminated against because of their race, religion, color, national origin, ancestry, disability, sex, age, medical condition, sexual orientation or marital status. Contractor further certifies that it will not maintain any segregated facilities. Contractor further agrees to comply with The Equal Employment Opportunity Practices provisions as set forth in Exhibit “E”. [Signatures Begin on Next Page]. 17 IN WITNESS WHEREOF, the Parties have signed this Agreement as of the Commencement Date stated on the cover page. City of Vernon, a California charter City and California municipal corporation By: ____________________________ Carlos R. Fandino Jr., City Administrator Industrial Environmental Association, a California corporation By: Name: Title: ATTEST: _______________________________ Lisa Pope, City Clerk By: Name: Title: APPROVED AS TO FORM: _______________________________ Brian Byun, Senior Deputy City Attorney 18 EXHIBIT A REQUEST FOR PROPOSALS City of Vernon Request for Proposals (RFP) Environmental Compliance, Outreach, Training and Education Services City of Vernon Department of Health and Environmental Control 4305 Santa Fe Avenue, Vernon, CA 90058 Phone: (323) 826-1448 t, 0. 1I t '!.i aa { f [Y TT{ City of Vernon Environmental Compliance, Outreach. Training, and Education Services Request for Proposals 1. INTRODUCTION AND PROJECT The City of Vernon is requesting proposals for Environmental Consultants to provide Environmental Compliance, Outreach, Training, and Education Services for the business sector. The City will select one firm, based on demonstrated competence and a cost effective approach to design, conduct, and assist in the City's many "service otferings" to companies opting to conduct business within City limits. 2. BACKGROUND The City of Vernon was founded in 1905, is approximately 5.2 square miles in size and is located approximately 5 miles southeast of downtown Los Angeles California. Over its long history, Vernon has been developed as an industrial community. At the turn of the 20th century the lands that make up Vernon were comprised largely of farmlands. The presence of three major rail lines in the area led influential business and propefty owners to encourage the railroad companies to run spur lines onto the farmlands. These rail extensions enabled the creation of an "exclusively industrial" city. By the 1920's, Vernon was attracting large stockyards and meatpacking facilities. ln the 1930's, Vernon became the location of choice for many heavy industrial plants. As economic conditions changed over the decades, these large scale industrial operations have relocated out of Southern California and Vernon has attracted smaller, lighter industrial facilities. The City's business friendly environment, low cost utilities and key location for trucking and rail transport continue to position Vernon as an ideal location for industrial uses. City Government: The City Council consists of five members, elected at-large, who serve five-year staggered terms. The City Council annually appoints a Mayor and a Mayor Pro Tem from its own membership to serve one-year terms. Labor Force: Vernon has approximately 280 employees, and its departments include a Fire Department, Police Department, Finance Department, Public Works Department, Public Utilities Department and Health and Environmental Control Department. Present bargaining units recognized include the Vernon Police Officers Benefit Association, Vernon Police Management Association, Vernon Firemen's Association, the Vernon Fire Management Association, lnternational Brotherhood of Electrical Workers Local 47, and Teamsters Local 911. 3. ENV!RONMENTALCOMPLIANCE ISSUES With growing number of environmental regulation arising in California, it is a challenge for businesses to keep abreast and allocate resources to ensure compliance. lnadequate representation on behalf of business at the local, state and federal level hinders collaborative relationships with regulatory bodies. Additionally, businesses may lack proactive educational and training activities that facilitate compliance. Page 2 of 9 City of Vernon Environmental Compliance, Outreach, Training, and Education Services Request for Proposals 4. SCOPE OF SERVICES REQUIRED The City of Vernon is seeking the services of a highly qualified consulting firm to assist in:. Comprehensive, customizable, in-house environmental compliance training for various categories of businesses from our location at Vernon City Hall;. Focus on Air, Hazmat, Sustainability and Water issues - preferably with offerings for Qualified lndustrial Storm Water Practitioner (OISP) Training, Stormwater Education, IGP TMDL Amendment Training, Hazardous Materials Training, and Air Permit Training;. Provide opportunities for environmental managers at Vernon businesses to meet regularly, remain current on regulations, exchange experiences and knowledge with their peers, and chances to remain in contact with regulatory statf for constructive conversations;. Work with Vernon businesses and regional regulators to identify key regulatory issues for Vernon industries; and. Develop workshops to address those key issues, including recruiting appropriate subject matter experts and regulatory staff to conduct and/or participate in training sessions along with scheduling and promoting such workshops among area businesses. 5. QUAL!FICATIONS & CRITERIA A. Qualifications: The City of Vernon will select one firm for all of the outlined Scope of Service on the basis of qualifications, experience, and cost. The following are the minimum qualifications to be used to evaluate responses to this Request for Proposals: Working knowledge of the environmental and regulatory issues facing manufacturing companies in the Los Angeles area; Familiarity with, and ability to monitor State and local legislation on environmental justice or environmental quality-of-life issues affecting Vernon area residents or businesses; Demonstrated experience in providing environmental training programs and workshops for industry on topics including air permitting and emission reporting, hazmat issues, sustainability, and storm water regulations including Total Maximum Daily Loads (TMDLS); The ability to develop a data base of Vernon businesses and Environmental Health & Safety (EH&S) contacts at those businesses in order to market and advertise scheduled programing to prospective attendees; and Demonstrated experience working with LA area regulatory agencies, including facilitating participation from regulatory agency staff members' in workshops and training sessions with industry. B. Selection Criteria: The City will conduct a comprehensive, fair, and impartial evaluation of proposals received in response to this RFP. All proposals received will be reviewed and evaluated by a committee of qualified personnel. The name, information, or experience of the individual members will not be made available to any proposer. The Evaluation Committee willfirst review and screen all proposals submitted, except for the cost proposals, according to the minimum qualifications a a a a a Page 3 of9 City of Vernon Environmental Compliance, Outreach, Training, and Education Services Request for Proposals set forth above. The following criteria will be used in reviewing and comparing the proposals and in determining the highest scoring bid: 40% Qualifications, background and prior experience of the firm in the Service Area(s) being proposed, experience of key staff assigned to oversee services provided to Vernon, evaluation of size and scope of similar work performed and success on that work. 30% Cost and fees to the City for handling matters. Cost is not the sole determining factor but will be taken into consideration. Proposer must offer services at a rate comparable to the rate proposer offers to other governmental entities for similar work. Offering a higher rate to the City than the comparable rate is grounds for disqualification of the Proposer. lf rates differ for different types or levels of service, or for different Service Areas, the Proposer should so state. 10% Responsiveness to the RFP, and quality and responsiveness of the proposal. 2Oo/" References including past performance of proposer. 6. FORMAT AND DELIVERY OF RESPONSE Respondents are asked to submit one (1) unbound original, six (6) hard copies and one (1) electronic copy (via email to vpetrosyan@ci.vernon.ca.us) of their proposals in sufficient detailto allow for a thorough evaluation and comparative analysis. The proposal should include, at a minimum, the following information in sectionalized format addressing all phases of the work in the RFP. A.Format: Limit your proposal to 20 typed 8.5" X 11" pages, or fewer, on white bond paper of at least 2O-pound weight single sided (excluding cover letter and attachments. You may attach a firm brochure if you wish, but it must be as a separate attachment and independent from the required elements noted above. 1 . Use a conventional typeface with a minimum font size of 12 points. Use a l" margin on all boarders. 2. Organize your submittal in the order described above 3. Prominently label the package: "Environmental Compliance, Outreach, Training, and Education Services" and include the name of the primary contact for the respondent. Deliver the response to: City of Vernon Department of Health & Environmental Control Attention: Veronica Petrosyan, EH Program Administrator 4305 Santa Fe Avenue Vernon, CA 90058 4. Responses are due on or before 5:00 p.m. on October 7,2019 Late response will not be accepted. 1 2 3 4 Page 4 of 9 B City of Vernon Environmental Compliance, Outreach, Training, and Education Services Request for Proposals 5. lf you have any questions about this RFP, please contact Veronica Petrosyan, Environmental Health Program Administrator at (323) 826- 1448. Please note that any questions asked and any response provided by Vernon will be sent to every person who will be submitting a proposal, to the extent the City is aware of them. Cover Letter: All proposals shall include a cover letter which states that the proposal shall remain valid for a period of not less than ninety (90) days from the date of submittal. lf the proposal contemplates the use of sub-contractors, the sub- contractors shall be identified in the cover letter. lf the proposal is submitted by a business entity, the cover letter shall be signed by an officer authorized to contractually bind the business entity. With respect to the business entity, the cover letter shall also include. the identification of the business entity, including the name, address and telephone number of the business entity; and the name, title, address and telephone number of a contact person during the proposal evaluation period. lntroduction: Present an introduction of the proposal and your understanding of the assignment and significant steps, methods and procedures to be employed by the proposer to ensure quality deliverables that can be delivered within the required time frames and your identified budget. General Scope of Work: Briefly summarize the scope of work as the proposer perceives or envisions it for each Service Area proposed. Work Plan: Present concepts for conducting the work plan and interrelationship of all projects. Define the scope of each task including the depth and scope of analysis or research proposed. Fees and costs: Although an important aspect of consideration, the financial cost estimate will not be the sole justification for consideration. Negotiations may or may not be conducted with the proposer; therefore, the proposal submitted should contain the proposer's most favorable terms and conditions, since selection and award may be made without discussion with any firm. All prices should reflect "not to exceed" amounts per item. Proposer must offer services at a rate comparable to the rate proposer offers to other governmental entities for similar work. Offering a higher rate to the City than the comparable rate is grounds for disqualification of the Proposer. Ability of the Proposer to Perform: Provide a detailed description of the proposer and his/her/its qualifications, including names, titles, detailed professional resumes and past experience in similar work efforts/products of key personnel who will be working on the assignment. Provide a list of specific related work projects that have been completed by the proposer which are directly related to the assignment described in this RFP. Note the specific individuals who completed such project(s). ldentify role and responsibility of each member of the project team. lnclude the amount of time key personnel will be involved in the respective portions of the assignment. Respondents are encouraged to supply relevant examples of their professional product. Provide a list of references. C D E F G Page 5 of9 H City of Vernon Environmental Compliance, Outreach, Training, and Education Services Request for Proposals The selected firm shall not subcontract any work under the RFP nor assign any work without the prior written consent of the City. Affidavit of Non-Collusion. Proposer must submit a completed and signed, "Affidavit of Non-Collusion." (Copy attached as Exhibit A). 7 ADDENDA. CHANGES. AND AM DMENTS TO THIS SOLICITATION At any time prior to the due date for responses, the City may make changes, amendments, and addenda to this solicitation, including changing the date due to allow respondents time to address such changes. Addenda, changes, and amendments, if made, will be posted on the City's website (www.cityofvernon.org), which is deemed adequate notice. A proposer may make a request to the City's project coordinator to be placed on a list of persons to receive notice of any such addenda, changes, or amendments. The preferred manner of communications is via e-mail due to its timeliness. 8. CONDITIONS FOR RESPONSES TO RFP The following conditions apply to this RFP process: Nothing contained in this RFP shall create any contractual relationship between the respondent and the City. This RFP does not obligate the City to establish a list of service providers qualified as prime contractors, or award a contract to any respondent. The City reserves the right to amend or cancel this RFP without prior notice, at any time, at its sole discretion. The City shall not be liable for any expenses incurred by any individual or organization in connection with this RFP. No conversations or agreements with any officer, agent, or employee of the City shall affect or modify any terms of this RFP. Oral communications or any written/e-mail materials provided by any person other than designated contact staff of City shall not be considered binding. The City reserves the right, in its sole discretion, to accept or reject any or all Proposals without prior notice and to waive any minor irregularities or defects in a Proposal. The City reserves the right to seek clarification on a Proposal with any source. The dates, times, and sequence of events related to this RFP shall ultimately be determined by the City. The schedule shown above is subject to change, at the sole discretion of the City, although the City will attempt to follow it and, if it must be altered, will attempt to provide reasonable notice of the changes. G. Respondents shall not issue any news release pertaining to this A. B. C D E F Page 6 of9 City of Vernon Environmental Compliance, Outreach, Training, and Education Services Request for Proposals H RFP, or the City without prior written approval of the City. All submitted proposals and information included therein or attached thereto shall become public record upon delivery to the City. 9.RIGHT BY THE CIry TO DRAW THIS REQUEST The City may, at its sole discretion and for any reason whatsoever, withdraw this solicitation at any time. 10. LIVING WAGE ORDINANCE IAND PREVAILING WAGE WHERE APPLICABLEI !F PREVA!LING WAGES DOES NOT APPLY MAKE SURE TO REMOVE HIGHLIGHTED LANGUAGE BELOW PRIOR TO SUBMITTING RFP FOR APPROVAL. The selected consultant shall pay qualifying employees a wage of not less than $10.30 per hour with health benefits, or $1 1.55 per hour without health benefits. The consultant shall also provide qualifying employees at least twelve days off per year for sick leave, vacation or personnel necessity, and an additional ten days a year of uncompensated time for sick leave. There shall be a prohibition on an employer retaliation against an employee's complaining to the City with regard to the employer's compliance with the living wage ordinance. Contractor, and any Subcontracto(s), shall comply with the City's Living Wage Ordinance. The current Living Wage Standards are set forth in Exhibit "D" of the standard form contract, attached hereto as Exhibit B. Upon the City's request, certified payroll records shall promptly be provided to the City. 11. STANDARD TERMS AND CONDITIONS Prior to the award of any work hereunder, City and proposer shall enter into the written contract for services attached hereto as Exhibit B. Proposers responding to this RFP are strongly advised to review all the terms and conditions of the Contract. The term of the Contract shall not exceed three (3) years. Page 7 of9 City of Vernon Environmental Compliance, Outreach, Training, and Education Services Request for Proposals EXHIBIT A AFFI DAVIT OF NON-COLLUSION Page 8 of9 AFFIDAVIT OF NON-COLLUSION BY CONTRACTOR STATE OF CALIFORNIA ) )sscouNTY oF LOS A|IGELES ) being first duly sworn deposes and says that he/she is (lnsert "Sole Owner". "Partner", "President. "Secretary". or other proper title) of (lnsen narne ofbidder) who submits herewith to the City of Vemon a bid/proposal; That all statements of fact in such bid/proposal are true; That such bid/proposal was not made in the interest ofor on behalfofany undisclosed person, partnership, company, association, organization or corporation; That such bid/proposal is genuine and not collusive or sham; That said bidder has not, directly or indirectly by agreement, communication or conference with anyone attempted to induce action prejudicial to the interest of the City of Vemon, or of any other bidder or anyone else interested in the proposed contract; and further That prior to the public opening and reading ofbids/proposals, said bidder: a. Did not directly or indirectly. induce or solicit anyone else to submit a false or sham bid/proposal; b.Did not directly or indirectly. collude, conspire, connive or agree with anyone else that said bidder or anyone else would submit a false or sham bid/proposal, or that anyone should refrain from bidding or withdraw his/her bid/proposal; Did not, in any manner, directly or indirectly seek by agreement, communication or conference with anyone to raise or fix the bid/proposal price of said bidder or of anyone else, or to raise or fix any overhead, profit or cost element of hisAer bid/proposal price, or of that of anyone else; Did not, directly or indirectly, submit his/her bid/proposal price or any breakdown thereof, or the contents thereof, or divulge information or data relative thereto. to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, or to any individual or group of individuals, except the City of Vemon, or to any person or persons who have a partnership or other financial interest with said bidder in his,&er business. I certifo under penalty of perjury that the above information is correct c. d. Date Title: March 20ll City of Vernon Environmental Compliance, Outreach, Training, and Education Services Request for Proposals EXHIBIT B STANDARD FORM CONTRACT Page 9 of9 SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND ICONTRACTOR'S NAME] FOR ENVIRONMENTAL COMPLIANCE, OUTREACH, TRAINING AND EDUCATION SERVICES COVER PAGE Contractor: Responsible Principal of Contractor: Notice lnformation - Contractor. Notice lnformation - City Commencement Date: Termination Date: Consideration: Records Retention Period [insert name of contractor] [insert name, title] [insert name of contractor] [insert street address] [insert city, state, zip code] Attention: [insert name, title] Phone: [insert phone number] Facsimile: [insert fax number] City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Attention: [insert department head] [insert department head title] Telephone: (323) 583-8811 ext. [insert] Facsimile: [insert fax number] [insert commencement date] [insert termination date] Total not to exceed $[insert amount] (includes all applicable sales tax); and more particularly described in Exhibit C Three (3) years, pursuant to Section 1 1.20 December 20171 SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND [CONTRACTOR'S NAME] FOR ENVIRONIVIENTAL COMPLIANCE, OUTREACH, TRAINING AND EDUCATION SERVICES This Contract is made between the City of Vernon ("City"), a California charter City and California municipal corporation ("City"), and [Contractor's Name], a [State incorporated in] corporation ("Contractor"). The City and Contractor agree as follows: 1.0 EMPLOYMENT OF CONTRACTOR. City agrees to engage Contractor to perform the services as hereinafter set forth as authorized by the City Council on 2.0 SCOPE OF SERVICES 2.1 Contractor shall perform all work necessary to complete the services set forth in the Request for Proposals dated , Exhibit "A", and Contractor's proposal to the City ("Proposal") dated Exhibit "B", both of which are attached to and incorporated into this Contract, by reference. 2.2 All services shall be performed to the satisfaction of City. 2.3 All services shall be performed in a competent, professional, and satisfactory manner in accordance with the prevailing industry standards for such services. 3.0 PERSONNEL. 3.1 Contractor represents that it employs, or will employ, at its own expense, all personnel required to perform the services under this Contract. 3.2 Contractor shall not subcontract any services to be performed by it under this Contract without prior written approval of City. 3.3 All of the services required hereunder will be performed by Contractor or by City-approved subcontractors. Contractor, and all personnel engaged in the work, shall be fully qualified and authorized or permitted under State and local law to perform such services and shall be subject to approval by the City. 2 December 2017 4.0 TERM. The Contractor shall commence the delivery of services on receipt of a written notice to proceed and shall complete the services on the schedule set forth in Exhibit "c". 5.0 COMPENSATION AND FEES. 5.1 Contractor has established rates for the City of Vernon which are comparable to and do not exceed the best rates offered to other governmental entities in and around Los Angeles County for the same services. For satisfactory and timely performance of the services, the City will pay Contractor in accordance with the payment schedule set forth in Exhibit "C" attached hereto and incorporated herein by reference. 5.2 Contractor's grand total compensation for the entire term of this Contract, shall not exceed [state amount] without the prior authorization of the City, as appropriate, and written amendment of this Contract. 5.3 Contractor shall, at its sole cost and expense, furnish all necessary and incidental labor, material, supplies, facilities, equipment, and transportation which may be required for furnishing services pursuant to this Contract. Materials shall be of the highest quality. The above Contract fee shall include all staff time and all clerlcal, administrative, overhead, insurance, reproduction, telephone, air travel, auto rental, subsistence, and all related costs and expenses. 5.4 City shall reimburse Contractor only for those costs or expenses specifically approved in this Agreement, or specifically approved in writing in advance by City. Unless otheruvise approved, such costs shall be limited and include nothing more than the following costs incurred by Contractor: 5.4.1 The actual costs of subcontractors for performance of any of the services that Contractor agrees to render pursuant to this Agreement, which have been approved in advance by City and awarded in accordance with this Agreement. 5.4.2 Approved reproduction charges. 3 December 2017 5.4.3 Actual costs and/or other costs and/or payments specifically authorized in advance in writing and incurred by Contractor in the performance of this Agreement. 5.5 Contractor shall not receive any compensation for extra work performed without the prior written authorization of City. As used herein, "extra work" means any work that is determined by City to be necessary for the proper completion of the Project, but which is not included within the Scope of Services and which the parties did not reasonably anticipate would be necessary at the time of execution of this Agreement. Compensation for any authorized extra work shall be paid in accordance with the payment schedule as set forth in Exhibit "C,' if the extra work has been approved by the City. 5.6 Licenses, Permits, Fees. and Assessments. Contractor shall obtain, at Contractor's sole cost and expense, such licenses, permits, and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and which arise from or are necessary for the performance of the Services by this Agreement. 6.0 PAYMENT. 6.1 As scheduled services are completed, Contractor shall submit to the City an invoice for the services completed, authorized expenses, and authorized extra work actually performed or incurred according to said schedule. 6.2 Each such invoice shall state the basis for the amount invoiced, including a detailed description of the services completed, the number of hours spent, reimbursable expenses incurred and any extra work performed. 6.3 Contractor shall also submit a progress report with each invoice that describes in reasonable detail the services and the extra work, if any, performed in the immediately preceding calendar month. 4 December 2017 6.4 Contractor understands and agrees that invoices which lack sufficient detail to measure performance will be returned and not processed for payment. 6.5 City will pay Contractor the amount invoiced within thirty (30) days after the City approves the invoice. 6.6 Payment of such invoices shall be payment in fullfor all services, authorized costs, and authorized extra work covered by that invoice. 7.0 CITY'S RESPONSIBILITY. City shall cooperate with Contractor as may be reasonably necessary for Contractorto perform its services; and will give any required decisions as promptly as practicable so as to avoid unreasonable delay in the progress of Contractor's services. 8.0 COORDINATION OF SERVICES. Contractor agrees to work closely with City staff in the performance of Services and shall be available to City's staff, consultants, and other staff at all reasonable times. 9.0 INDEMNITY. Contractor agrees to indemnify City, its officers, elected officials, employees and agents against, and will hold and save each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities (herein "claims or liabilities"), including but not limited to professional negligence, that may be asserted or claimed by any person, firm or entity arising out of or in connection with the work, operations or activities of Contractor, its agents, employees, subcontractors, or invitees, provided for herein, or arising from the acts or omissions of Contractor hereunder, or arising from Contractor's performance of or failure to perform any term, provision, covenant or condition of this Agreement, except to the extent such claims or liabilities arise from the gross negligence or willful misconduct of City, its officers, elected officials, agents or employees. 10.0 INSURANCE. Contractor shall, at its own expense, procure and maintain policies of insurance of the types and in the amounts set forth below, for the duration of the Contract, including any extensions thereto. The policies shall state that they afford primary 5 December 2017 coverage. i. Automobile Liability with minimum limits of at least $1,000,000 combined single limit, including owned, hired, and non-owned liability coverage. ii. Contractor agrees to subrogate automobile liability resulting from performance under this agreement by agreeing to defend, indemnify and hold harmless, the City, and its respective employees, agents, and City Councilfrom and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney's fees ("Claims"), which are attributable to any act or omission by the City under the performance of the services. iii. General Liability with minimum limits of at least $1,000,000 per occurrence and $2,000,000 aggregate written on an lnsurance Services Office (lSO) Comprehensive General Liability "occurrence" form or its equivalent for coverage on an occurrence basis. Premises/Operations and Personal lnjury coverage is required. The City of Vernon, its directors, commissioners, officers, employees, agents, and volunteers must be endorsed on the policy as additional insureds as respects liability arising out of the Contractor's performance of this Contract. (1) lf Contractor employs other contractors as part of the services rendered, Contractor's Protective Coverage is required. Contractor may include all subcontractors as insureds under its own policy or shall furnish separate insurance for each subcontractor, meeting the requirements set forth herein. (2) Contractor agrees to subrogate General Liability resulting from performance under this agreement by agreeing to defend, indemnify and hold harmless, the City, and its respective employees, agents, and City Councilfrom and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney's fees ("Claims"), which are attributable to any act or omission by the City under 6 December 20'17 the performance of the services. iv. Professional Errors and Omissions coverage in a sum of at least $1,000,000, where such risk is applicable. Applicable aggregates must be identified and claims history provided to determine amounts remaining under the aggregate. Contractor shall maintain such coverage for at least one (1) year after the termination of this Agreement. v. Contractor shall comply with the applicable sections of the California Labor Code concerning workers' compensation for injuries on the job. ln addition, Contractor shall require each subcontractor to similarly maintain workers' compensation insurance in accordance with the laws for California for all of the subcontractor's employees. Compliance is accomplished in one of the following manners: (1) Provide copy of permissive self-insurance certificate approved by the State of California; or (2) Secure and maintain in force a policy of workers' compensation insurance with statutory limits and Employer's Liability lnsurance with a minimal limit of $1,000,000 per accident. The policy shall be endorsed to waive all rights of subrogation against City, its directors, commissioners, officers, employees, and volunteers for losses arising from performance of this Contract; or (3) Provide a "waiver" form certifying that no employees subject to the Labor Code's Workers' Compensation provision will be used in performance of this Contract. vi. Each insurance policy included in this clause shall be endorsed to state that coverage shall not be cancelled except after thirty (30) days' prior written notice to City. vii. lnsurance shall be placed with insurers with a Best's rating of no less than A-Vlll. viii. Prior to commencement of performance, Contractor shallfurnish City with a certificate of insurance for each policy. Each certificate is to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificate(s) must be in a form approved by 7 December 20,l7 City. City may require complete, certified copies of any or all policies at any time. ix. Failure to maintain required insurance at all times shall constitute a default and material breach. ln such event, Contractor shall immediately notify City and cease all performance under this Contract until further directed by the City. ln the absence of satisfactory insurance coverage, City may, at its option: (a) procure insurance with collection rights for premiums, attorney's fees and costs against Contractor by way of set-off or recoupment from sums due to Contractor, at City's option; (b) immediately terminate this Contract and seek damages from the Contract resulting from said breach; or (c) self-insure the risk, with all damages and costs incurred, by judgment, settlement or otheruvise, including attorney's fees and costs, being collectible from Contractor, by way of set-off or recoupment from any sums due to Contractor. 11.0 GENERAL TERMS AND CONDITIONS. 11.1 INDEPENDENT CONTRACTOR 11.1.1 lt is understood that in the performance of the services herein provided for, Contractor shall be, and is, an independent contractor, and is not an agent, officer or employee of City and shallfurnish such services in its own manner and method except as required by this Contract, or any applicable statute, rule, or regulation. Further, Contractor has and shall retain the right to exercise full control over the employment, direction, compensation and discharge of all persons employed by Contractor in the performance of the services hereunder. City assumes no liability for Contractor's actions and performance, nor assumes responsibility for taxes, bonds, payments, or other commitments, implied or explicit, by or for Contractor. Contractor shall be solely responsible for, and shall indemnify, defend and save City harmless from all matters relating to the payment of its employees, subcontractors and independent contractors, including compliance with social security, withholding and all other wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever. 11.1.2 Contractor acknowledges that Contractor and any subcontractors, 8 December 2017 agents or employees employed by Contractor shall not, under any circumstances, be considered employees of the City, and that they shall not be entitled to any of the benefits or rights afforded employees of City, including, but not limited to, sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term disability or workers' compensation insurance benefits. 11.2 CONTRACTOR NOT AGENT. Except as the City may authorize in writing, Contractor and its subcontractors shall have no authority, express or implied, to act on behalf of or bind the City in any capacity whatsoever as agents or otherwise. 11.3 OWNERSHIP OF WORK. All documents and materials furnished by the City to Contractor shall remain the property of the City and shall be returned to the City upon termination of this Agreement. All reports, drawings, plans, specifications, computer tapes, floppy disks and printouts, studies, memoranda, computation sheets, and other documents prepared by Contractor in furtherance of the work shall be the sole property of City and shall be delivered to City whenever requested at no additional cost to the City. Contractor shall keep such documents and materials on file and available for audit by the City for at least three (3) years after completion or earlier termination of this Contract. Contractor may make duplicate copies of such materials and documents for its own files or for such other purposes as may be authorized in writing by the City. 11.4 CORRECTION OF WORK. Contractor shall promptly correct any defective, inaccurate or incomplete tasks, deliverables, goods, services and other work, without additional cost to the City. The performance or acceptance of services furnished by Contractor shall not relieve the Contractor from the obligation to correct subsequently discovered defects, inaccuracy, or incompleteness. 11.5 Contractor shall be responsible for its work and results under this Agreement. Contractor, when requested, shall furnish clarification and/or explanation as may be required by the City, regarding any services rendered under this Agreement at no additional cost to City. ln the event that an error or omission attributable to I December 2017 Contractor occurs, then Contractor shall, at no cost to City, provide all necessary design drawings, estimates and other Contractor professional services necessary to rectify and correct the matter to the sole satisfaction of City and to participate in any meeting required with regard to the correction. 1 1.6 WAIVER. The City's waiver of any term, condition, breach, or default of this Contract shall not be considered to be a waiver of any other term, condition, default or breach, nor of a subsequent breach of the one waived. The delay or failure of either party at any time to require performance or compliance by the other of any of its obligations or agreements shall in no way be deemed a waiver of those rights to require such performance or compliance. No waiver of any provision of this Agreement shall be effective unless in writing and signed by a duly authorized representative of the party against whom enforcement of a waiver is sought. 11.7 SUCCESSORS. This Contract shall inure to the benefit of, and shall be binding upon, the parties hereto and their respective heirs, successors, and/or assigns. 11.8 NO ASSIGNMENT. Contractor shall not assign or transfer this Contract or any rights hereunder without the prior written consent of the City and approval by the City Attorney, which may be withheld in the City's sole discretion. Any unauthorized assignment or transfer shall be null and void and shall constitute a material breach by the Contractor of its obligations under this Contract. No assignment shall release the original parties from their obligations or otherwise constitute a novation. 11.9 COMPLIANCE WITH LAWS. Contractor shall comply with all Federal, State, County and City laws, ordinances, rules and regulations, which are, as amended from time to time, incorporated herein and applicable to the performance hereof, including but without limitation, the Vernon Living Wage Ordinance. Violation of any law materialto performance of this Contract shall entitle the City to terminate the Contract and otherwise pursue its remedies. Further, if the Contractor performs any work knowing it to be contrary to such laws, rules, and regulations Contractor shall be solely responsible for all costs arising therefrom. 1 1 .10 ATTORNEY'S FEES. lf any action at law or in equity is brought to 10 December 2017 enforce or interpret the terms of this Contract, the prevailing party shall be entitled to reasonable attorney's fees, costs, and necessary disbursements in addition to any other relief to which such party may be entitled. 11.11 INTERPRETATION. 11.11.1 Applicable Law. This Contract shall be deemed a contract and shall be governed by and construed in accordance with the laws of the State of California. Contractor agrees that the State and Federal courts which sit in the State of California shall have exclusive jurisdiction over all controversies and disputes arising hereunder, and submits to the jurisdiction thereof. 11.11.2 Entire Aqreement. This Contract, including any exhibits attached hereto, constitutes the entire agreement and understanding between the parties regarding its subject matter and supersedes all prior or contemporaneous negotiations, representations, understandings, correspondence, documentation, and agreements (written or oral). 11.11.3 Written Amendment. This Contract may only be changed by written amendment signed by Contractor and the City Administrator or other authorized representative of the City, subject to any requisite authorization by the City Council. Any oral representations or modifications concerning this Contract shall be of no force or effect. 11.11.4 Severabilitv. lf any provision in this Contract is held by any courtof competent jurisdiction to be invalid, illegal, void, orunenforceable, such portion shall be deemed severed from this Contract, and the remaining provisions shall nevertheless continue in full force and effect as fully as though such invalid, illegal, or unenforceable portion had never been part of this Contract. 11.11.5 Order of Precedence. ln case of conflict between the terms of this Contract and the terms contained in any document attached as an Exhibit or otherwise incorporated by reference, the terms of this Contract shall strictly prevail. The terms of the City's Request for Proposals shall control over the Contractor's Proposal. 11 December 20"17 11.11.6 Duplicate Orioinals. There shall be two (2) fully signed copies of this Contract, each of which shall be deemed an original. 11.11.7 Construction. In the event an ambiguity or question of intent or interpretation arises with respect to this Agreement, this Agreement shall be construed as if drafted jointly by the parties and in accordance with its fair meaning. There shall be no presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of any of the provisions of this Agreement. 11.'12 TIME OF ESSENCE. Time is strictly of the essence of this contract and each and every covenant, term, and provision hereof. 11.13 AUTHORITY OF CONTRACTOR. The Contractor hereby represents and warrants to the City that the Contractor has the right, power, legal capacity, and authority to enter into and perform its obligations under this Contract, and its execution of this Contract has been duly authorized. 11.14 ARBITRATION OF DISPUTES. Any dispute for under $25,000 arising out of or relating to the negotiation, construction, performance, non-performance, breach, or any other aspect of this Contract, shall be settled by binding arbitration in accordance with the Commercial Rules of the American Arbitration Association at Los Angeles, California and judgment upon the award rendered by the Arbitrators may be entered in any court having jurisdiction thereof. The City does not waive its right to object to the timeliness or sufficiency of any claim filed or required to be filed against the City and reserves the right to conduct full discovery. 1 1.15 NOTICES. Any notice or demand to be given by one party to the other must be given in writing and by personal delivery or prepaid first-class, registered or certified mail, addressed as follows. Notice simply to the City of Vernon or any other City department is not adequate notice. 12 December 2017 lf to the City: City of Vernon Attention: 4305 Santa Fe Avenue Vernon, CA 90058 lf to the Contractor Any such notice shall be deemed to have been given upon delivery, if personally delivered, or, if mailed, upon receipt, or upon expiration of three (3) business days from the date of posting, whichever is earlier. Either party may change the address at which it desires to receive notice upon giving written notice of such request to the other party. 11.16 NOTHIRD PARTY RIGHTS. ThisAgreement isentered intoforthesole benefit of City and Contractor and no other parties are intended to be direct or incidental beneficiaries of this Agreement and no third party shall have any right or remedy in, under, or to this Agreement. 1 1.17 TERMINATION FOR CONVENIENCE (Without Cause). City may terminate this Contract in whole or in part at any time, for any cause or without cause, upon fifteen (15) calendar days' written notice to Contractor. lf the Contract is thus terminated by City for reasons other than Contractor's failure to perform its obligations, City shall pay Contractor a prorated amount based on the services satisfactorily completed and accepted prior to the effective date of termination. Such payment shall be Contractor's exclusive remedy for termination without cause. 11.18 DEFA LT ln the event either party materially defaults in its obligations hereunder, the other party may declare a default and terminate this Contract by written notice to the defaulting party. The notice shall specify the basis for the default. The Contract shall terminate unless such default is cured before the effective date of termination stated in such 13 December 2017 notice, which date shall be no soonerthan ten (10) days afterthe date of the notice. ln case of default by Contractor, the City reserves the right to procure the goods or services from other sources and to hold the Contractor responsible for any excess costs occasioned to the City thereby. Contractor shall not be held accountable for additional costs incurred due to delay or default as a result of Force Majeure. Contractor must notify the City immediately upon knowing that non-performance or delay will apply to this Contract as a result of Force Majeure. At that time Contractor is to submit in writing a Recovery Plan for this Contract. lf the Recovery Plan is not acceptable to the City or not received within 10 days of the necessary notification of Force Majeure default, then the city may cancel this order in its entirety at no cost to the City, owing only for goods and services completed to that point. 1 1.19 TERMINATION FOR CAUSE. Termination for cause shall relieve the terminating party of further liability or responsibility under this Contract, including the payment of money, except for payment for services satisfactorily and timely performed prior to the service of the notice of termination, and except for reimbursement of (1) any payments made by the City for service not subsequently performed in a timely and satisfactory manner, and (2) costs incurred by the City in obtaining substitute performance. lf this Agreement is terminated as provided herein, City may require, at no additional cost to City, that Contractor provide all finished or unfinished documents, data, and other information of any kind prepared by Contractor in connection with the performance of Services under this Agreement. Contractor shall be required to provide such document and other information within fifteen (15) days of the request. 11.19.1 Additional Services. ln the event this Agreement is terminated in whole or in part as provided herein, City may procure, upon such terms and in such manner as it may determine appropriate, services similar to those terminated. 11.20 MAINTENANCE AND INSPECTION OF RECORDS. The City, or its authorized auditors or representatives, shall have access 14 December 2017 to and the right to audit and reproduce any of the Contractor's records to the extent the City deems necessary to insure it is receiving all money to which it is entitled under the Contract and/or is paying only the amounts to which Contractor is properly entitled under the Contract or for other purposes relating to the Contract. The Contractor shall maintain and preserve all such records for a period of at least three (3) years after termination of the Contract. The Contractor shall maintain all such records in the City of Vernon. lf not, the Contractor shall, upon request, promptly deliver the records to the City of Vernon or reimburse the City for all reasonable and extra costs incurred in conducting the audit at a location otherthan the City of Vernon, including, but not limited to, such additional (out of the City) expenses for personnel, salaries, private auditors, travel, lodging, meals, and overhead. 11.21 CONFLICT. Contractor hereby represents, warrants, and certifies that no member, officer, or employee of the Contractor is a director, officer, or employee of the City of Vernon, or a member of any of its boards, commissions, or committees, except to the extent permitted by law. 11.22 HEADINGS. Paragraphs and subparagraph headings contained in this Agreement are included solely for convenience and are not intended to modify, explain or to be a full or accurate description of the content thereof and shall not in any way affect the meaning or interpretation of this Agreement. 11.23 ENFORCEMENT OF WAGE AND HOUR LAWS Eight hours labor constitutes a legal day's work. The Contractor, or subcontractor, if any, shall forfeit twenty-five dollars ($25) for each worker employed in the execution of this Agreement by the respective Contractor or subcontractor for each calendar day during which the worker is required or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar week in violation of the provisions of Sections 1810 through 1815 of the California Labor Code as a penalty paid to the City; provided, however, work performed by employees of contractors in excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon 15 December 2017 compensation for all hours worked in excess of 8 hours per day at not less than 1% times the basic rate of pay. 1 1.24 LIVING WAGES Contractor, and any Subcontractor(s), shall comply with the City's Living Wage Ordinance. The current Living Wage Standards are set forth in Exhibit "D". Upon the City's request, certified payroll records shall promptly be provided to the City. 1'1.25 EQUAL EMPLOYMENT OPPORTUNITY PRACTICES. Contractor certifies and represents that, during the performance of this Contract, it and any other parties with whom it may subcontract shall adhere to equal employment opportunity practices to assure that applicants, employees and recipients of service are treated equally and are not discriminated against because of their race, religion, color, national origin, ancestry, disability, sex, age, medical condition, sexual orientation or marital status. Contractor further certifies that it will not maintain any segregated facilities. Contractor further agrees to comply with The Equal Employment Opportunity Practices provisions as set forth in Exhibit "E". [Signatures Begin on Next Page]. '16 December 2017 lN WITNESS WHEREOF, the Parties have signed this Agreement as of the Commencement Date stated on the cover page. City of Vernon, a California charter City and California municipal corporation By: Insert Name and Title] ATTEST: Deborah Harrington, lnterim City Clerk APPROVED AS TO FORM: Hema Patel, City Attorney ICONTRACTOR'S NAME, a [State incorporated inl corporation By: Name: Title: By: Name. Title: 17 December 2017 EXHIBIT A REQUEST FOR PROPOSALS 18 December 20 1 7 EXHIBIT B PROPOSAL 19 December 2017 EXHIBIT C SCHEDULE 20 December 2017 EXHIBIT D LIVING WAGE PROVISIONS Minimum Livinq Waqes: A requirement that Employers pay qualifying employees a wage of no less than $10.30 per hour with health benefits, or $11.55 per hour without health benefits. Paid and Unpaid Davs Off: Employers provide qualifying employees at least twelve compensated days off per year for sick leave, vacation, or personal necessity, and an additional ten days ayeat of uncompensated time for sick leave. No Retaliation A prohibition on employer retaliation against employees complaining to the City with regard to the employer's compliance with the living wage ordinance. Employees may bring an action in Superior Court against an employer for back pay, treble damages for willful violations, and attorney's fees, or to compel City officials to terminate the service contract of violating employers. 21 December 2017 EXHIBIT E EQUAL EMPLOYMENT OPPORTUNITY PRACTICES PROVISIONS A. Contractor certifies and represents that, during the performance of this Agreement, the contractor and each subcontractor shall adhere to equal opportunity employment practices to assure that applicants and employees are treated equally and are not discriminated against because of their race, religious creed, color, national origin, ancestry, handicap, sex, or age. Contractor further certifies that it will not maintain any segregated facilities. B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for employment placed by or on behalf of Contractor, state that it is an "Equal Opportunity Employer" or that all qualified applicants will receive consideration for employment without regard to their race, religious creed, color, national origin, ancestry, handicap, sex or age. C. Contractor agrees that it shall, if requested to do so by the City, certify that it has not, in the performance of this Agreement, discriminated against applicants or employees because of their membership in a protected class. D. Contractor agrees to provide the City with access to, and, if requested to do so by City, through its awarding authority, provide copies of all of its records pertaining or relating to its employment practices, except to the extent such records or portions of such records are confidential or privileged under state or federal law. E. Nothing contained in this Agreement shall be construed in any manner as to require or permit any act which is prohibited by law. 22 December 2017 19 EXHIBIT B PROPOSAL \ October 7, 2019 City of Vernon Department of Health and Environmental Control Attention: Veronica Petrosyan, EH Program Administrator 4305 Santa Fe Avenue Vernon, CA 90058 Dear Ms. Petrosyan, Thank you for the opportunity to submit this Proposal for the Industrial Environmental Association (IEA) to provide Environmental Compliance – Outreach, Training and Education Services for businesses in the City of Vernon. This proposal shall remain valid for a period of not less than ninety (90) days from the date of submittal. IEA has had the pleasure of providing training and education services to businesses in the City of Vernon for over three years – the last 15 months of which was under contract with the City. This past July, with the City’s support, IEA coordinated the 1st Annual Vernon Environmental Conference at Bishop Salesian High School. The all-day Conference included presentations on AB 617, Air Emission Reporting, Health and Safety, and Sustainable Practices. For a first-year event, our goal was to attract 50 attendees. As an indication of Vernon’s growing reputation for supporting outreach and compliance, and interest within the Vernon business community for this programming, approximately 135 people registered and attended the Conference. IEA has enjoyed the opportunity to bring our 35-year old, time-tested model for supporting collaboration and communication between regulators and the regulated community to the City of Vernon. We look forward to the opportunity to continue supporting the City and the standard it has set in the LA area for fostering sustainable environmental compliance. Sustainable and measurable compliance can only be achieved through a program of ongoing outreach and education, and that is what this proposal will continue to deliver for the City of Vernon. IEA looks forward to working in partnership with the City to carry out the program outlined in this proposal. Thank you for your consideration. Sincerely, Jack Monger Chief Executive Officer PROPOSAL FOR SERICES TO THE CITY OF VERNON Environmental Compliance, Outreach, Training and Educational Services: A sustainable pathway to environmental compliance and improved quality of life SUBMITTED BY: THE INDUSTRIAL ENVIRONMENTAL ASSOCIATION October 7, 2019 INDUSTRIAL ENVIRONMENTAL ASSOCIATION 1330 ORANGE AVE, SUITE 100 CORONADO, CA 92118 Phone Number: 619-522-9000 Contacts: Jack Monger CEO jack.monger@ieaca.org Claire Stuhr Marketing and Events Assistant Claire.stuhr@ieaca.org INTRODUCTION TO THE INDUSTRIAL ENVIRONMENTAL ASSOCIATION The Industrial Environmental Association (IEA) has served as the “voice of industry” in the Greater San Diego Region for 36 years. IEA is a 501(c)6 non-profit California Corporation. The mission of IEA is two-fold: to serve as an advocate for manufacturing during the development of environmental regulations affecting business. Once the legislation is codified or new regulations have been approved, IEA’s role is to provide outreach and education to industry to help achieve overall compliance. IEA believes that sustainable environmental compliance by businesses, both small and large, is best achieved through outreach and education. This is accomplished through workshops, seminars, and focused presentations that bring together both regulators and representatives from regulated industry. IEA training programs have been recognized by EPA through federal grants awarded to IEA for environmental outreach to businesses operating in Tijuana, Mexico. The hallmark of IEA’s education efforts has been the creation and sponsorship of the West Coast’s largest environmental conference, which currently attracts nearly 600 compliance professionals to the San Diego Convention Center each year. The 35th Annual Environmental Conference was this past week and included compliance professionals representing hundreds of companies, as well as legislative and regulatory leaders from state and local agencies along with environmental professionals from the US Navy, Ports of LA, Long Beach and San Diego, the San Diego Airport Authority, UCSD, San Diego State University, and the San Diego County Water Authority. The Conference emphasizes environmental education and compliance and brings together regulators and the regulated community in a collaborative environment that is essential to promoting the highest levels of environmental standards and compliance. THE PROPOSAL IEA is responding to the City’s request for proposals to assist the City of Vernon in addressing one of the major challenges facing industrial communities in California – improving environmental compliance among industrial businesses to enhance the quality of life in the community. The challenge is exasperated because each year in California, all variety of industries are challenged by a cascade of new and complex environmental regulations. Staying current with new requirements is an ongoing challenge for many businesses, as evidenced by the extent of the growing number of violations issued each year by regulatory agencies. According to the South Coast Air Quality Management District, at least 700 companies in Vernon received a Notice of Violation within the past 4 years, and many of these companies received multiple Notices of Violation. In addition, a significant number of violations were also issued by the Los Angeles Regional Water Board. It is clear that a large percentage of violations occur because compliance professionals are not well informed about regulatory changes or are unclear about their responsibilities. As a result, environmental compliance is compromised, affecting environmental quality for both workers and residents in Vernon and surrounding communities. Meanwhile, there is a severe shortage of state and local resources to support outreach to the regulated community and build awareness of new regulatory requirements. Regulatory compliance is only achievable and sustainable if accompanied by an effective education and outreach effort. IEA is submitting this proposal to build on the progress of the past 15 months and deliver a program of workshops and seminars in Vernon that will continue to enhance awareness among Vernon businesses and lead to better compliance practices and a better environmental quality of life for the City and its neighboring communities. PREVIOUS IEA INVESTMENT AND OUTREACH IN VERNON In 2016, IEA was invited by several Vernon companies to explore the development of an IEA affiliate in Vernon and specifically to introduce IEA’s time-tested model for collaboration and communication between regulators and the regulated community. That effort began in January 2017. The first step was establishing relationships with the Vernon Chamber of Commerce as well as State and Local regulatory agencies in the Los Angeles area. Following that, IEA began a series of workshops in Vernon on topics such as the Qualified Industrial Storm Water Practitioner (QISP) Training, Stormwater Education, the IGP TMDL Amendment, Hazardous Materials Training, and Air Permit Training. Most of these workshops involved attendance and presentations by regulatory staff from the above mentioned organizations. Both the City of Vernon and the Vernon Chamber of Commerce were helpful in disseminating workshop announcements, and the City also assisted by providing meeting space. Beginning in May of 2018, IEA came under contract with the City of Vernon to provide outreach, training and education services. From May of 2018 through August of 2019, IEA organized 15 workshops covering a wide variety of environmental issues relevant to Los Angeles area businesses. Through our relationships with California regulatory agencies in Los Angeles and Sacramento, IEA was able to provide speakers from South Coast AQMD, LA Regional Water Quality Control Board, Department of Toxic Substances Control (DTSC), CARB, California CUPA, the County of Los Angeles and City of Vernon, as well as several consulting firms with significant experience in the LA area. In July of 2019, IEA conducted the 1st Annual Vernon Environmental Conference which drew approximately 130 attendees from companies in the Vernon area. The all-day Conference included presentations on AB 617, Air Emission Reporting, Health and Safety, Sustainable Practices, and Environmental Justice policies emanating from Sacramento. We believe the success of this first Conference resulted from growing awareness and involvement by Vernon businesses resulting from IEA’s activities over the previous three years. IEA’s investment in the City of Vernon and the reputation we have established over the past three years working with businesses, local regulators, and City staff puts us in a unique position to effectively execute the City’s goals outlined in this RFP. GENERAL SCOPE OF WORK We envision that our scope of work under this contract is to continue applying our collaborative model for education and outreach in the City of Vernon and build on what we accomplished from 2017 through 2019. Those efforts would include: • Continuing our outreach to regulatory agencies in the Los Angeles area through dedicated meetings with their leadership, involving regulatory staff in our training programs, and communicating the City’s commitment to environmental compliance • Installing the regulatory committee structure from the IEA model that focuses on issues regarding air quality, Hazmat, sustainability, water quality, and storm water. This will provide opportunities for environmental managers at Vernon businesses to meet regularly, stay current on regulations, share experience with their peers, and offer opportunity for contact with regulatory staff in an environment often more constructive than what occurs during the inspection process • Working with Vernon businesses and regional regulators to identify key regulatory issues for Vernon industries • Developing workshops to address those key issues, including recruiting appropriate subject matter experts and regulatory staff to conduct training, scheduling and promoting workshops among area businesses, preparing workshop materials and handouts, and surveying attendees for feedback to insure continuous program improvement • Continuing the development of a reliable data base of environmental managers from Vernon area companies for better outreach and communication and to increase attendance at workshops and meetings • Providing an opportunity during workshops and meetings for environmental managers to share their challenges and experiences and discuss any concerns with their peers • Continue providing legislative updates from Sacramento to Vernon businesses. IEA meets in Sacramento at least monthly with representatives and lobbyists for California businesses to monitor legislation and regulatory developments that affect manufacturing and business. • Providing refreshments and/or food to help encourage attendance at workshops • Submitting reports to the City detailing workshop schedule, speakers, attendees and survey feedback • Plan and coordinate the 2nd Annual Environmental Conference for the Summer of 2020 in the Vernon area CONTRACTING ENTITY AND PROGRAM MANAGEMENT The Contracting Entity for these services will be IEA, a 501(c)6 California corporation. Program management will be provided by CEO Jack Monger. Mr. Monger will have overall responsibility for managing all facets of this program and for all communications with the City of Vernon. He will be assisted by Claire Stuhr, IEA’s Marketing and Events Assistant. WORK PLAN 1. Monthly workshops Plan and conduct monthly workshops addressing priority issues of concern for Vernon businesses. Topics will include: • AB 617 • Air Quality • Air Permitting • Hazardous Materials • Waste diversion • Emission reporting • Stormwater • TMDL Amendment to IGP • Sustainable Practices • Hazardous Materials Business Plans and chemicals of concern • Water savings techniques for industry • Case studies for environmental compliance Speakers will include experts in innovative technology, as well as regulatory staff from the Regional Water Control Board, DTSC, the City of Vernon, California Air Resources Board, California Water Resources Control Board, South Coast Air Quality Management District, and Vernon CUPA. 2. Facility Tours When possible, monthly meetings will be held on site at local businesses and include facility tours by the host company. The August meeting in Vernon took place at R Planet Earth and was attended by nearly 20 business representatives along with City Councilwoman Carol Menke. This was an excellent opportunity for interaction between Vernon’s elected leadership and the environmental managers from area companies, and something we would work to continue for future workshops. 3. Regulatory Outreach To support our programs, IEA will personally maintain frequent contacts with regulatory representatives to participate in our workshops, but just as I important, to keep regulators updated on efforts by the City of Vernon to enhance environmental awareness and compliance. At least quarterly, IEA will meet personally with appropriate representatives from California regulatory representatives in Los Angeles or Sacramento. 4. 2nd Annual Vernon Environmental Conference IEA will also plan and coordinate the 2nd Annual Vernon Environmental Conference at an appropriate facility in or near Vernon. The Conference will build off the success of its predecessor event and will be supported by fees from attendees, exhibitors and sponsors. While the City will be listed as our Conference Co-sponsor as it was in 2019, the City will have no financial responsibility or liability for the Conference. However, while it is not required, we would hope that when the time comes, the City will consider joining other sponsors of the event with a small contribution of $500 - $1,000. To help spotlight the City’s initiative and commitment to enhancing the environmental quality of life in Vernon and in surrounding communities, IEA will include attribution to the City on all flyers, presentation slides, printed items, and marketing materials. This will occur at al workshops and at the Conference, both of which are attended by numerous regulatory staff members. This is a good way to constantly remind them of Vernon’s commitment to enhancing environmental compliance. 5. Evaluation To measure our progress in expanding outreach and growing awareness, IEA will conduct follow up surveys of workshop attendees on a quarterly basis. We will also reach out by telephone for elaboration on comments, should they be particularly insightful. This will help us garner an understanding of how to better communicate with businesses in Vernon and specifically address their needs and concerns. In help measure the extent to which this program improves the quality of life, IEA will rely on communications with local regulatory agencies. The Air Quality Management District, and the Local Regional Water Board, among others, will be monitoring compliance and violation activity and will be able to inform us of changes to the number of violation notices issued annually. Open communication with regulatory agencies is a critical part of IEA’s collaborative efforts in the Greater San Diego Region and we hope to continue this practice in Vernon. Conference performance will be measured by the number of attendees, the number of exhibitors, and the post Conference surveys. FEES AND COSTS Item 1: Workshop Budget Cost estimates for Workshops and Facility Tours: • Travel expenses for staff, speakers, lodging, meals, etc. $ 675 • Costs for meeting rooms (when applicable) $ 60 • IEA staff costs and overhead for rent, internet, telephone, event promotion, outreach to businesses, coordination of speakers, RSVP collection, post event surveys and follow up report to City $1,700 • Lunches/refreshments provided at workshops and $ 320 committee meetings • Printing and Miscellaneous $ 75 • E&O Insurance $ 130 Not-to-exceed cost per workshop: $2,960.00 Total Annual Cost of for 11 workshops $32,560.00 Item 2: Regulatory Outreach Meetings Cost estimates for meetings with LA and Sacramento regulators • Travel expenses, lodging, meals, etc $575 • IEA overhead for rent, internet, telephone $900 • IEA staff support costs $400 • E&O Insurance $130 Not-to-exceed cost per Regulatory Outreach Meeting $2,005.00 Total Annual Cost for Five Regulatory Outreach Meetings $10,025.00 Total Annual Program Cost $42,585.00 IEA reserves the right to adjust these costs by up to 4% after each 12-month period to reflect increased costs for labor, travel and services. IEA is, and will remain in compliance with the City’s living wage ordinance. ABILITY OF THE PROPOSER TO PERFORM Program management will be provided by CEO Jack Monger. Mr. Monger will have overall responsibility for managing all facets of this program and for all communications with the City of Vernon. He will be assisted by Claire Stuhr, IEA’s Marketing and Events Assistant. Mr. Monger’s resume is included in Attachment 1. He has been the CEO of IEA since 2012. He negotiated and managed the previous Outreach, Training and Education Services Contract with the City of Vernon. Mr. Monger currently manages all aspects if IEA’s activities in San Diego and is the organization’s advocate in Sacramento. In San Diego, Mr. Monger oversees the four workshops monthly covering issues of air quality, water, hazardous materials, and sustainability. He also has lead responsibility for IEA’s Annual Environmental Conference which draws 550 – 600 attendees and is now in its 36th Year. As CEO, Mr. Monger is responsible for the financial performance of the organization and is the lead advocate for manufacturing interests in the San Diego area. Mr. Monger will be assisted by Claire Stuhr, IEA’s Vernon Programs and Conference Coordinator. Ms. Stuhr joined IEA in April 2019 to assist in marketing and coordinating workshops in Vernon and to manage the 1st Annual Environmental Conference. In addition to helping pull off a successful Conference, she played a major role and devoted many hours to expanding the data base of companies and individuals in Vernon that were prospects for the workshops and for the Conference. Here efforts contributed significantly to the high turnout at the Conference. Ms. Stuhr will dedicate approximately 50% of her time to supporting this contract. CONCLUSION The only sustainable path to environmental compliance is through outreach and education. The IEA Model of outreach and education will help the City increase regulatory awareness among hundreds of industrial residents, raise the level of environmental compliance among those businesses, and positively enhance the quality of life for workers and residents in Vernon and surrounding communities. ATTACHMENT 1 ATTACHMENT 2 Chief Executive Officer: Jack Monger Jack Monger was appointed as the CEO of the Industrial Environmental Association in June 2012. He is only the 4th person to hold that position in the past 36 years. Prior to joining the IEA, Jack worked as a lobbyist and government / public relations professional in San Diego for 23 years. Jack’s clients included companies and organizations in the fields of healthcare, real estate development, airport and maritime operations, travel and tourism, and the U. S. Navy. Jack played a role in some of San Diego’s most controversial public policy issues such as San Diego’s switch to the Strong Mayor form of government, the development of Petco Park, and the establishment of the region’s clean syringe exchange program. Mr. Monger was a Naval Officer for six years prior to returning to San Diego in 1981. Jack moved to the public sector in 1983 when he joined the staff of San Diego City Councilmember Gloria McColl, where he was responsible for media and community relations. During this time Jack also ran McColl’s successful election campaign against challenger Bob Filner. In 1985, Jack was tapped to serve as the first San Diego County Executive Director for the City of Hope Cancer Research Hospital and direct that organization’s operations in San Diego region. In 1987, Mr. Monger became the Executive Director of the Hall of Champions Sports Museum in Balboa Park. In 1990, Jack joined The Corky McMillin Companies where he directed business and community relations. This position led to his involvement with numerous public and private organizations and his work with business and political leaders from San Diego to Washington, D.C. Jack is a past-President of the San Diego County Taxpayers Association and remains active in a variety of San Diego organizations, including, San Diego Regional Chamber of Commerce, Community Health Improvement Partners, San Diego Port Tenants Association, and the San Diego Downtown Partnership. Jack is a graduate of the U.S. Naval Academy. Jack and Darby Monger have three daughters and have resided in Coronado since 1981. Programs and Conference Coordinator: Claire Stuhr. Ms. Stuhr joined IEA in April 2019 as the Programs and Conference Coordinator for Vernon. Originally from Portland, Oregon, she graduated from the University of Redlands with a B.A.in English and Environmental Science. She moved to San Diego in early 2019 and currently resides in Imperial Beach. In addition to her activities in support of the Vernon contract this past year, Ms. Stuhr assists with the coordination of IEA’s four monthly committee meetings and with the Annual San Diego Environmental Conference. She also handles all social media for IEA. ATTACHMENT 3 References are attached to the email submitted on October 4, 2019, and include: • Antonia Gunner, Republic Services • Hector Garcia, Bachem (Community Member) • Steve Shanklin, Sweetener Products Co. • Robert Gutterman, Crown Poly • Andy Thoummaraj, Evonik Corporation • Hector Morfin, Sweetener Products Co. 20 EXHIBIT C SCHEDULE FEES AND COSTS Item 1: Workshop Budget Cost estimates for Workshops and Facility Tours: • Travel expenses for staff, speakers, lodging, meals, etc. $ 675 • Costs for meeting rooms (when applicable) $ 60 • IEA staff costs and overhead for rent, internet, telephone, event promotion, outreach to businesses, coordination of speakers, RSVP collection, post event surveys and follow up report to City $1,700 • Lunches/refreshments provided at workshops and $ 320 committee meetings • Printing and Miscellaneous $ 75 • E&O Insurance $ 130 Not-to-exceed cost per workshop: $2,960.00 Total Annual Cost of for 11 workshops $32,560.00 Item 2: Regulatory Outreach Meetings Cost estimates for meetings with LA and Sacramento regulators • Travel expenses, lodging, meals, etc $575 • IEA overhead for rent, internet, telephone $900 • IEA staff support costs $400 • E&O Insurance $130 Not-to-exceed cost per Regulatory Outreach Meeting $2,005.00 Total Annual Cost for Five Regulatory Outreach Meetings $10,025.00 Total Annual Program Cost $42,585.00 IEA reserves the right to adjust these costs by up to 4% after each 12-month period to reflect increased costs for labor, travel and services. IEA is, and will remain in compliance with the City’s living wage ordinance. 21 EXHIBIT D LIVING WAGE PROVISIONS Minimum Living Wages: A requirement that Employers pay qualifying employees a wage of no less than $10.30 per hour with health benefits, or $11.55 per hour without health benefits. Paid and Unpaid Days Off: Employers provide qualifying employees at least twelve compensated days off per year for sick leave, vacation, or personal necessity, and an additional ten days a year of uncompensated time for sick leave. No Retaliation: A prohibition on employer retaliation against employees complaining to the City with regard to the employer’s compliance with the living wage ordinance. Employees may bring an action in Superior Court against an employer for back pay, treble damages for willful violations, and attorney’s fees, or to compel City officials to terminate the service contract of violating employers. 22 EXHIBIT E EQUAL EMPLOYMENT OPPORTUNITY PRACTICES PROVISIONS A. Contractor certifies and represents that, during the performance of this Agreement, the contractor and each subcontractor shall adhere to equal opportunity employment practices to assure that applicants and employees are treated equally and are not discriminated against because of their race, religious creed, color, national origin, ancestry, handicap, sex, or age. Contractor further certifies that it will not maintain any segregated facilities. B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for employment placed by or on behalf of Contractor, state that it is an "Equal Opportunity Employer" or that all qualified applicants will receive consideration for employment without regard to their race, religious creed, color, national origin, ancestry, handicap, sex or age. C. Contractor agrees that it shall, if requested to do so by the City, certify that it has not, in the performance of this Agreement, discriminated against applicants or employees because of their membership in a protected class. D. Contractor agrees to provide the City with access to, and, if requested to do so by City, through its awarding authority, provide copies of all of its records pertaining or relating to its employment practices, except to the extent such records or portions of such records are confidential or privileged under state or federal law. E. Nothing contained in this Agreement shall be construed in any manner as to require or permit any act which is prohibited by law. City Council Agenda Item Report Agenda Item No. COV-187-2018 Submitted by: Lilia Hernandez Submitting Department: City Administration Meeting Date: December 3, 2019 SUBJECT Council Conference Attendance Report Recommendation: A. Find that receiving this Council Conference Attendance Report is exempt from California Environmental Quality Act ("CEQA") review, because it is an administrative activity of government that will not result in direct or indirect physical changes in the environment and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378; and B. Receive and file Background: Pursuant to Government Code Section 53232.3(d), members of legislative bodies are required to report on meetings attended at the expense of the agency or for which there has been expense reimbursement. The following report on a recent conference attended by a member of the Vernon City Council is submitted in compliance with the aforementioned requirement. 2019 League of California Cities Annual Conference & Expo Council Member Carol Menke attended the League of California Cities Annual Conference & Expo in Long Beach, CA from October 16-18, 2019. Mayor Melissa Ybarra was also scheduled to attend the Conference. The League’s Annual Conference & Expo is an opportunity for city officials to learn and collaborate on solutions for the common challenges facing California cities. Session topics included: Safety & Communications at Large Events, Leveraging Technology to Optimize Government Outcomes, Best Practices for 2020 Census, Sustainability, Public Banking Movement, and Housing & Homelessness. Fiscal Impact: The cost incurred by the City for City Council attendance of the conference noted above is approximately $1,322. This amount is in line with the amount included in the 2019-20 fiscal year City Council budget. ATTACHMENTS  City Council Agenda Item Report Agenda Item No. COV-534-2019 Submitted by: John Lau Submitting Department: Finance/ Treasury Meeting Date: December 3, 2019 SUBJECT Approval of RDA Obligation Retirement Account Warrant Register No. 56 Covering the Period of November 12 through November 25, 2019 Recommendation: A. Approve RDA Obligation Retirement Account Warrant Register No. 56 which totals $2,702.30 and consists of the following: 1) Ratification of electronic payments totaling $2,702.30. Background: Section 2.13 of the Vernon Municipal Code indicates the City Treasurer, or an authorized designee, shall prepare warrants covering claims or demands against the City which are to be presented to City Council for its audit and approval. Pursuant to the aforementioned code section, the City Treasurer has prepared RDA Obligation Retirement Account Warrant Register No. 56 covering claims and demands presented during the period of November 12 through November 25, 2019, drawn, or to be drawn, from East West Bank for City Council approval. Fiscal Impact: None. ATTACHMENTS 1. RDA Obligation Retirement Account Warrant Register No. 56 CITYOFVERNON RDA OBTIGATION RETIREMENT ACCOUNT WARRANT REGISTER NO.56 DECEMBER 3,2019 I hereby certify that claims and/or demands included in above listed warrant register have been audited for accuracy and availability of funds for payments and that said claims and/or demands are accurate and that the funds are available for payments thereof. Director of Finance / City Treasurer oate, 1l/zc/zor1 This is to certify that the claims or demands covered by the above listed warrants have been audited by the City Council of the City of Vernon and that all of said warrants are approved for payments except Warrant Numbers: Scott Williams Ptified: Lt/25/2019 12:39:19PM CITY OF VERNON RDA OBLIGATION RETIREMENT ACCOUNT WARRANT REGISTER NO.56 DECEMBER 3,2019 ETECTRONIC AC@U I TXVOIGE PAYMEI|T PAIltEl.T PAYMEIIT vE oonl{! EAxo t{uMaEf, I|UMBER AMOUin DESCnImOt'l nVOrcE P.O.l DArE I{UM'ER ,.:AiiOUm 002533 - BAN( or NEw YoRK MELLoN 022.1022.592010 S 2,702.30 adminirtGtion & Audit confrrmation Fees 2s22217125 1712012019 37 s 2,702-30 TOTAT ETECTRONTC s 2,7O23O Ptnnedi ltl26lzol9 12:39:19PM Paee 1 of 2 C]TY OF VERNON RDA OBLIGATION RETIREMENT ACCOUNT WARRAI{T REGIST€R NO. 56 DECEMBER 3, 2019 RECAP BY FUND ELECTRONIC TOTAI. EARLY CHECI( TOTAL WARRANT TOTAL GRAND TOTATS 022 . VERNON REDEVELOPMENT AGENCY S 2,702.30 S O.OO S o.0o s 0.00 s 2,t02.30 s 2,702.30 s 0.m 5 2,7O2.3OGRAND TOTAL TOTAI. CHECKS TO BE PRINTED O Printed; 112612019 12:39:19PM ,fu 2 ol2 City Council Agenda Item Report Agenda Item No. COV-536-2019 Submitted by: John Lau Submitting Department: Finance/ Treasury Meeting Date: December 3, 2019 SUBJECT Approval of Operating Account Warrant Register No. 35 Covering the Period of November 12 through November 25, 2019 Recommendation: A. Approve Operating Account Warrant Register No. 35 which totals $11,102,930.59 and consists of the following: 1) Ratification of electronic payments totaling $10,715,256.02. 2) Ratification of the issuance of early checks totaling $344,781.87. 3) Authorization to issue pending checks totaling $42,892.70. Background: Section 2.13 of the Vernon Municipal Code indicates the City Treasurer, or an authorized designee, shall prepare warrants covering claims or demands against the City which are to be presented to City Council for its audit and approval. Pursuant to the aforementioned code section, the City Treasurer has prepared Operating Account Warrant Register No. 35 covering claims and demands presented during the period of November 12 through November 25, 2019, drawn, or to be drawn, from East West Bank for City Council approval. Fiscal Impact: None. ATTACHMENTS 1. Operating Account Warrant Register No. 35 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 I hereby certify that claims and/or demands included in above listed warrant register have been audited for accuracy and availability of funds for payments and that said claims and/or demands are accurate and that the funds are available for payments thereof. D'%^ Scott Williams Director of Finance / City Treasurer o^t", l(/ua(z.ntl This is to certify that the claims or demands covered by the above listed warrants have been audited by the city council of the city of Vernon and that all of said warrants are approved for payments except Warrant Numbers: Printed: 11/2612019 2:49 :26PM CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2OT9 0s7.1057.500173 s 4,139.00 lnternet Access Services 1115192003744000267. BROADBAND LLC ttl14l2ot9 9021 s 4,139.00 002143. CITY OF PASADENA 055.9200.500154 s 76,500.00 Natural Gas 10/19 30009364 17/t4/2Ot9 9022 5 76,500.00 OO51O8 - JEMMOTT ROLLINS GROUP, tNc 011.1021.797000 s 23,250.00 Professional Services 10/19-OCT19 771L412079 9023 s 23,250.00 OOO2O9. MERRIMAC ENERGY GROUP 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 011.120030 s s S s s S s s s s s s s 7,953.53 DIESEL FUEL 14.61 AB32 Fee 5.78 Federal Oil SPill Tax 1,747.20 State Diesel Tax 3.17 Lust Fee 7,216.67 Clear Diesel Sales Tax 13,346.56 UNLEADED FUEL 17.47 ca Enviro/Fed Oil SPill Tax 7.42 Ca Childhood lead Free 19.19 AB32 Fee 2,338.99 State Gasoline Excise Tax 4.95 Lust Fee 708.02 Fuel SalesTax 4.50% 27936t7 27936t7 2L93677 2793677 27936L7 27936t7 2193618 2193618 2193618 2193518 2193618 2193518 2193618 011.0014107 011.0014107 01.1.0014107 011.0014107 011.0014107 011.0014107 011.0014107 011.0014107 011.0014107 011.0014107 011.0014107 26,778.50 P rinted: lll 261 2Ol9 2i49'.26PM r7l14l2oL9 9024 s Page 1 of 38 CIW OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3, 2019 ETECTRONICffi tilrotct 'PAyMEir pAyitE {r f yitEt{Twooiiiffi4ronur,[ri xuiirB ;:.'::,:,,' ruourr oqi&iinqi. '..i':::. rrworct p.o.i ,': ort luued .' . ^r.oum 005614- l{oRTHwEsT ELECIRICIL 020-1084.9011000 i 316.00 re.hni.llDetign setui@s 1755 SERVICES, 020.1084.900000 S 32,712.00 Technical Design Services 055.8200.596200 S 4,751.10 Technical Design Services 020.1084.520000 5 240.00 Technical Design Services 055.9000.595200 S 2,844.00 Technical Design Services 1755 1755 1755 1755 LuL4l2019 902s s 40,853.10 005433- RUTAN&TUCKER,LLP 011.1024.593200 S 9,551.50 Re:Torres/OngLitiSation 850361 77/1412Ot9 9026 s 9,ss1.s0 OOL47O - SHAHRAM SHARIFZADEH 055.9200.596500 S 36.89 SCPPA Renewable Working Group 1028L9 ]-LlLAlzOLg 9027 s 36.89 002517 - SO CAL PUBLIC POWER 055.9200.500154 S 272,746.@ Astoria 2 Solar Project AUTHORITY ATSP1119 7ut4l2019 9028 s 212/^46.09 001695 - VULCAN MATERIALS CO 020.1084.520000 S 360.26 Paving Materials- 020.1084.520000 S 358.68 Paving Materials- 020.1084.520000 S 442.99 Paving Materials- 72384454 011.0013886 7238761"6 011.0013886 72389773 011.0013886 Ltlt4l2OL9 9029 s 1,161.93 004442- WIRELESS INNOVATION 055.9000.900000 S 1,180.00 lridium LIMITED 77h4/2O19 eo3o s 1,180.00 P rinted: ll/ 26 / 2ol9 2'.49 :26P M 54729 Page 2 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 002472 - CALIFORNIA ISO 055.9200.500150 s 055.9200.500150 s 055.9200.500150 s 055.9200.500190 s 055.9200.s00210 s 0s5.9200.5001s1 s 0ss.9200.s00170 s 0ss.9200.s00190 s 0ss.9200.s00210 s 055.9200.s00150 s 055.9200.500151 s 055.9200.500170 s 33.40 lnitial Charges 11119 -9.00 Recalculation Charges 10/19 882,616.07 lnitial Charges 11/19 4,866.75 lnitial Charges 11/19 9,779.77 lnitial Charges 11/19 -1.37 lnitial Charges 11/19 -33,735.14 lnitial Charges 11119 88.06 Recalculation Charges 10/19 22.80 Recalculation Charges 10/19 -6,261.62 Recalculation Charges 10/19 -4.72 Recalculation Charges 10/19 -5,229.11 Recalculation Charges 10/19 201911723743722 662 20t977723t43722 662 201977723143722 877 207977723t43722 817 207977723t43722 877 201977L23743722 877 201977723t43722 8\7 207917L23143722 877 20791tt23743722 877 20L9tLt23743722 8L7 20r9rtl23743722 8L7 2019t1123743722 8L7 8s2,165.23 P tint dt lll 26 I 2ol9 2:49 :26P M 7Llt8/2OL9 9031 s Page 3 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 001617 - UPS 0s5.8000.590000 011.1043.520000 011.1041.520000 89.74 Period:10/19 84.10 Period:10/19 28.0O Period:10/19 s s s 933312439 933312439 933312439 LLlt2/2079 eo32 s 20r.84 OO37O5. CYBERNETICS 011.9019.590110 s 1,132.00 Annual extended maintenance with 803176 011.0014096 rtl20l2oL9 9033 s 1,132.00 002384- POWER ENGINEERS, INC 0s5.9100.900000 s 359.55 Professional Services 310350 ttl20/2oL9 9034 s OO1O79. SIEMENS MOBILITY, INC 011.1043.590000 011.1043.590000 011.1043.590000 s s s 3,239.00 Traffic Signal Maintenance 1,953.00 Traffic Signal Maintenance 3,436.37 Traffic Signal Maintenance 56LOL8L272 5620019484 s620026836 ttl20l20L9 903s s 8,628.37 003584. WILLIAMS DATA MANAGEMENT 011.1003.s95200 s 375.00 Storage Services 4847t8 7712o/2O79 9036 s 375.00 003584. WILLIAMS DATA MANAGEMENT 011.1003.595200 s 7,475.5L Storage Services 485795 ttl20/2079 9037 s t,475.57 OO3O49. PETRELLI ELECTRIC, INC 9038 s 1,643,3s3.4s Printed : 11/2612019 2:49:26PM 055.200400 S 1,643,353.45 Electric Service Maintenance Ltl2ol20t9 Page 4 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 002468. DEPARTMENT OF WATER & POWER 055.9200.500170 055.9200.500250 s s 27,87 O.O0 Electric Energy Transactions 575.00 Electric Energy Transactions GA195208 GA195208 003158 - AETNA HEALTH OF CALIFORNIA 011.1026.502031 S 1t,227.15 Medicare PPO Retirees 011.1026.502031 S 2,486.99 Medicare HMO Retirees t!2,l2o1s jg4-l- -!lyz! 31295454 31296304 Printedi 1112612019 2:49:26PM Page 5 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 005172 - BLUESHIELDOFCALIFORNIA 011.1026.502031 otL.21022L 020.270227 055.210221 056.2tO227 07L.2LO221 020.27022t 055.210221 07L.270221 o20.270221 oss.2to22t 056.270221 orL.270221 020.210227 055.210221 057.2LO22t 0L1.210227 020.270221 otl.27022L o17.210227 071.210221 020.21022L 071.2tO227 Plnted: LLl26l2O79 2:49:26PM ( s s s s s s s s s s s s s s s s s s 5 s s s s 1,115.58 COBRA 93,566.00 Medical High HMO: Payment 8,159.26 Medical High HMO: Payment 22,77O.OO Medical High HMO: Payment 5,871.90 Medical High HMO: Payment 20,289.80 Medical High PPO: PaYment 260.12 Medical High PPO: Payment 1.,474.O4 Medical High PPO: PaYment 48,L2L.46 Medical HSA PPO: Payment 4,248.30 Medical HSA PPO: Payment 4,736.36 Medical HSA PPO: Payment 606.90 Medical HSA PPO: Payment 68,985.80 Medical Low HMO: Payment 4,70t.3O Medical Low HMO: PaYment 77,392.82 Medical Low HMO: Payment 252.12 Medical Low HMO: Payment -606.90 EE0235 Credit Received 1,339.03 8E0359 Retired, Credit Due 1,957.30 EE0920 Retired, Credit Due 1,888.12 EE1076 Retired, Credit Due -7,307.32 EE1064 Plan Change, Adjusted 551.84 EE0389 Plan Change, Adjusted -1,776.24 EE1140 New hire, must be billed 192900005720 192900007473 792900007473 792900007473 192900007473 192900007473 192900007473 L92900007473 192900007473 192900007473 192900007473 792900007473 192900007473 192900007473 192900007473 792900007473 792900007473 L92900007473 192900007473 792900007473 192900007473 192900007473 t92900007473 Page 6 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 OO5L72. BLUE SHIELD OF CALIFORNIA 055.2T0221 011.1004.530034 011.1026.502031 1,957.30 EE0130 Unpaid Leave 0.79 Rounding adjustment 84,855.31 Early Retirees S s s 192900007473 L92900007473 192900007846 Lr/27/2019 9041 s 391,4s1.99 Printed: 11/2612019 2:49 :26PM Page 7 of 38 ETECTRONIC CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2OI9 OO3O8O - METLIFE GROUP BENEFITS 0rr.270222 020.2LO222 055.270222 056.270222 }LL.210222 020.2to222 05s.270222 os6.270222 057.210222 ,LL.210222 0rr.270222 o20.2to222 055.270222 o77.2t0222 0r7.2to222 055.2LO222 011.1004.530034 011.1026.502031 KM059s6024 0001 KM05956024 0001 KM05956024 0001 KM0s956024 0001 KM05956024 0001 KM05956024 0001 KM059s6024 0001 KM05956024 0001 KM05955024 0001 KM05956024 0001 KM05956024 0001 KM05956024 0001 KM05956024 0001 KM05956024 0001 KM059s5024 0001 KM05956024 0001 KM05956024 0001 KM05956024 0001 s S s s s s S s S s s s s s s s S s L6,847.42 Dental PPO lnsurance: Payment 909.17 Dental PPO lnsurance: Payment 3,033.61 Dental PPO lnsurance: Payment 362.48 Dental PPO lnsurance: Payment L,167.98 Dental HMO lnsurance: Payment 167.56 Dental HMO lnsurance: Payment 419.68 Dental HMO lnsurance: Payment 47.52 Dental HMO lnsurance: Payment 6.34 Dental HMO lnsurance: PaYment -51.09 EE0235 Resigned, Credited 38.80 EE1064 Plan Change, Adiusted 49.59 EEO389 Plan Change, Adjusted 51.09 EE1073 Resigned, Credit Due -188.10 EE1139 New Hire,To Be Billed -188.10 EE1140 New Hire,To Be Billed 15.58 EE0130 UnPaid Leave 0.98 RoundingAdjustment 6,436.11 Dental Premiums - Retirees and COBRA ttl2t/2O19 9042 s 29,727.72 005067 . BIOFUEL GENERATION SERVICES, L 15,860.50 P intedi lll 2612019 2:49:26PM 05s.920O.s00162 s 15,860.50 Biomethane RPS102019 tL/27/2019 9043 s Page 8 of 38 ETECTRONIC VENDOR NAME AND NUMEER : PAYMENT P.O.S DATE CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 OOO147 - GENERAL PUMP COMPANY, rNc 020.1084.s90000 020.1084.900000 s s 719,432.10 Well 11 Pump & Motor Project 2,480.62 Well & Booster Pump Repairs 27370 27377 1t127/2079 eo44 s Lzt,912.72 001649 - PIC ENVIRONMENTAL SERVICE CORP 011.1060.595200 s 500.00 Consulfing Services 15751 tLl27/2019 904s s 003336 - BTCENT (CALIFORNIA) MALBURG, L 055.9200.500150 055.9200.500150 055.9200.500180 055.9200.500150 5 364,L77.64 S 31,23s.68 s 3,s95,131.20 s -2,236.31 Monthly Energy Related Payment Monthly Heat Rate Monthly Capacity Payment Fuel Burden 10201901 10201901 10201901 10201901 Ltl20/2Or9 9046 $ 3,989,308.21 006262 - MERCURIA ENERGY AMERICA, INC 055.9200.500160 S 561,159.97 Natural Gas 10/19 2975353 LLl2tl2Ot9 9047 s 561,159.97 0025t7 - so cAL PUBLIC PowER AUTHORIW 055.9200.500180 s 256,109.00 Minimum cost 11119 0s5.920O.500150 s 45,213.00 Variable cost 10/19 055.122100 s 10,000.00 PSF cost 11/19 PV1119 PV1119 PV1119 7u2u2Ot9 9048 s 311,322.00 005388 - CONOCO PHILLIPs COMPANY 055.9200.500160 s 48,507.50 P rinled: 77 I 26 I 2O79 2'.49:26PM 48,507.50 Natural Gas 10/19 129168 Ltl2tl2079 904e s Page 9 of 38 CIW OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2Ot9 ELECTRONIC P Yi,rq{r PAYi4fr{r ,!,l uEt{r vE Dor AUEA diruirlEn 'i' rdr,frER ':' liiiifurr otsoirmon :!i:::i ' NtolcE P.o.l :' D Ii ItuMBEi 'Ailou l_"-_.::::::::: 006086 - MACQUARIE ENERGY, LLC 055.9200.500150 s 953,135.00 Natural Gas 10/19 GASt00126511 rLl2u2Ot9 9050 s 953,135.00 006318 - MTECO, INC 055.9200.500150 s 13,250.00 Natural Gas 10/19 263861 L7l2rl2079 90s1 s 13,250.00 002577 - SO CAL PUBLIC POWER AUTHORITY 055.9200.s00154 s 184,555.08 Antelope DSR 1 Solar Project DSR11119 tLl2u20L9 eos2 s 184,655.08 002517. SO CAL PUBLIC POWER AUTHORITY 055.9200.500154 s 219,630.46 Puente Hills Landfill Gas Project PHL1119 tL/2u2079 90s3 s 2t9,630.46 OO2227 - US DEPARTMENTOF ENER6Y 055.9200.500150 055.9200.500180 29,647.96 Boulder Canyon Project Charges 10/19 15,209.60 Boulder Canyon Project Charges 10/19 s s GG1766W1019 GG1766W1019 7u2Ll2O79 eos4 s M,857.56 002060 - CALPTNE ENERGY SERVICES, 055.9200.500160 s 53,993.82 Natural Gas 10/19 002459. PORT CANAVERAL PWR 0ss.9000.595200 5 4,750.00 Consulting Services VERNPVHOCTOBER 2019CONSULTANTS P tinte d: 7 1 / 26 / 2079 2:49 i26P M Page 10 of 38 goss s 53,993.82 4,750.00eos6 s CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3, 2019 OO24T2 - CALIFORNIA ISO 0s5.9200.500150 s 055.9200.5001s1 s 055.9200.500210 s 055.9200.500170 s 055.9200.500190 s oss.9200.5001s1 s 055.9200.500210 s 0ss.9200.s001s0 s oss.92oo.s0017o s 05s.920O.500190 s oss.9200.s00170 s 055.9200.500180 s 055.9200.500190 s 055.920O.500240 s lnltial Charges 11/19 lnitial Charges 1U19 lnitial Charges 1V19 lnitial Charges 11/19 lnitial Charges 1V19 Recalculation Charges 11119 Recalculation Charges 11/19 Recalculation Charges 11/19 Recalculation Charges 11/19 Recalculation Charges 11/19 Recalculation Charges 10/19 Recalculation Charges 10/19 Recalculation Charges 10/19 Recalculation Charges 10/19 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 185,972.55 1.59 15,333.43 -7,359.98 -12,410.53 4.33 23.83 -2,393.47 -100.47 -34.81 15,717.75 45.18 415.51 94.40 P rinled: 7U 26 I 2079 2i49 :26P M Page 11 of 38 ETECTRONIC VENDOR NAME AND NUMBER AMOUNT DESCRIPTION CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 oo24L2- CALIFORNIA lso 055.9200.500150 s 055.9200.500151 s 0ss.920o.500210 s 055.9200.500151 s 055.9200.500170 s oss.920o.soo190 5 055.9200.500210 s oss.9200.soo1so 5 oss.9200.s00180 s Recalculation Charges 10/19 Recalculation Charges 10/19 Recalculation Charges 10/19 Recalculation Charges 08/19 Recalculation Charges 08/19 Recalculation Charges 08/19 Recalculation Charges 08/19 Recalculation Charges 08/19 Recalculation Charges 08/19 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 201911193143818 380 20191119314381.8 380 201911193143818 380 201911193143818 380 -10,592.85 -119.08 -91.65 L.27 335.27 7,L77.96 0.07 -192.80 -2.56 011.1049.s20000 s 82.16 Small Tools & Plumbing Hardware-1044345 011.0013892001552 - HOME DEPOT CREDIT SERVICES 7u2Ll2O79 90s8 s 82.16 006298 - CIMA ENERGY, LP LO1982L24842729 3 75,697.97 P rinted: 77 / 26 I 2O79 2i49 t26P M 05s.9200.s00160 s 75,697.97 Natural Gas 10/19 71l2sl2Or9 9os9 s Page 12 of 38 ETECTRONIC CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 - ixvotaE ME[r ? YUEm ? lllEl{I vEr{Dor xalr! at{o I{UMIIR I{uiilER lfot l{T QEscflPrxr lllllolcE P,o.I D tE tluMaEE aiaouE::i:::i=:-:=::-i ..........- ::--:=-:- - ETECTRONIC 000059 - so cAL EDlsoN 055.8100.560010 S 24.96 Period:10/19 103019 7712r/2019 9060 s 24.96 000059 - so cAL EDISON 011.1043.560000 S 34.39 Period:10/19 011.1042.560000 S 244.66 Period:10/19 103019(2) 11021e(2) tt/22/2OL9 9061 s 279.Os 001617 - UPS 011.1033.520000 s 40.55 Period:10/19 011.1041.520000 S 41.19 Period:10/19 933312449 933312449 77/2212079 9062 s 8r.74 OO34O7 - VERNON pOLtCE OFFTCERS 011.210250 5 2,078.58 Police Association Member Dues: Payment 8en220436 BENEFIT ru27/20t9 9063 s 2,O78.s8 005392 - TEAMSIEiS lOC L 911 011.210250 I 1,8OO.OO Teamst.rs Local 911 Dues: PaYment Ben22o422l o2O21O25O , 432.@ TEmsters Local9ll DuB: Favment B€n220424 055.210250 S 172.80 Team3teE to.algu Dues: P.Ym.nt 0en220424 05t.210250 I 7.20 T€amsteR tdal911 Dues: Payment 8.n22o424 a 27l20r9 9064 S 2A12.@ 003141 - VERNON FIREMENS 011.210250 S 2,668.00 Fire House Fund: Payment ASSOCIATION 8en220438 1112712OL9 9065 s 2,668.00 Printed: 11/2612019 2:49:26PM Page 13 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 003168 . ICMA RETIREMENT TRUST 457 S 22,885.50 Deferred Compensation: Payment S 1,993.55 Deferred Compensation: Payment S 5,945.45 Deferred Compensation: Payment S 1,350.18 Deferred Compensaton: Payment S 20.00 Deferred Compensation: Payment oLL.270220 020.270220 055.210220 055.210220 057.270220 8en220428 Ben22O428 Ben22O428 Ben220428 Ben22O428 tL/2712Or9 9066 s 33,794.79 OO4O75. THE DEPARTMENT OF THE TREASURY 011.210210 020.21o2Lo 055.210210 056.210210 057.210210 011.210210 020.210210 055.210210 056.210210 057.270270 011.210210 011.210210 011.210210 S 101,919.54 Federal Withholding: Payment S 5,918.13 Federal Withholding: Payment S 23,787.84 Federal Withholding: PaYment 5 2,775.39 Federal Withholding: Payment S 69.09 Federal Withholding: Payment S 25,286.97 Medicare: Payment S 1,619.18 Medicare: Payment S 5,911.50 Medicare: Payment S 619.90 Medicare: Payment S fS.S4 Medicare: PaYment 5 7,529.70 Social SecurityTax: Payment S 35,815.96 SP656: FWT s 6,155.17 SP654: MEDI 8en220432 Ben220432 Ben22O432 Ben22O432 8en220432 Ben22O432 8en220432 8en220432 Ben22O432 8en220432 8en220432 8en220432 Ben22O432 P tinte d: lU 26 I 20 19 2:49 :26P M Page 14 of 38 ELECTRONIC VENDOR NAME AND NUMBER CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 001635 - EMPLOYMENT DEVELOPMENT DEPT 011.210210 020.2to270 055.210210 056.210210 0s7.2ro270 011.210210 S 41,095.40 State withholding: Payment 5 2,277.77 StateWithholding:Payment 5 9,947.35 StateWithholding:Payment 5 1,097.72 Statewithholding:Payment 5 23.23 State Withholding: Payment s 10,745.08 SP655 8en220434 Ben22O434 Ben220434 Ben220434 8en220434 9068 s Printed: 11/2512019 2149 i26PM Page 15 of 38 7u2212079 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO. 35 DECEMBER 3, 2019 EAII.EITI IAYMEI{T PAIITEI{T vEI{t oRit llrE AltolluirlEi NUMIER al/loul{I ogicllPT(lll |II!/OICE P.O.I OAIE ltuilllB Alrot ifl ........................:.j ELECTRON]C OOO714- CALPERS 071.210240 s 195,459.24 PERS Contributions: Payment O2O.2LO24} $ 9,617.19 PERS Contributions: Payment 055.210240 S 31,088.30 PERS Contributons: Payment 056.210240 S 3,674.51 PERS Contributions: Payment 057.270240 S 90.31 PERSContribufions: Payment 17L.27O24O 5 4,279.76 PERS 1% Cost-Sharing: Payment O2O.2tO24o S 354.56 PERS 1%Cost-Sharing: Payment o55.27o24o S 1,559.43 PERS 1% Cost-sharing: Payment 056.210240 S 205.72 PERS 1%Cost-Sharing: Payment 011.210240 S 170.19 PERS Survivor's Benefit: Payment O2O.21.O24} S 14.34 PERS Survivor's Benefit: Payment 055.210240 S 31.04 PERS Survivor's Benefit: Payment 056.210240 S 3.72 PERS Survivor's Benefit: Payment 057.270240 S 0.19 PERS Survivor's Benefit: Payment 011.210240 S SOS.85 PERS Buy-back: Payment 011.1004.530034 S -0.25 RoundingAdjustment 8en220430 Ben220430 8en220430 Ben220430 8en220430 Ben220430 8en220430 8en220430 8en220430 Ben220430 8en220430 8en220430 Ben220430 8en220430 8en220430 Ben220430 ttl22/2079 9069 s 246,866.49 OO4O74. STATE DISBURSEMENT UNIT 077.270260 011.210260 011.210250 011.210260 959.23 Child Support: Payment 1,4O2.L5 Child Support: Payment 69.23 Child Support: Payment 41.53 child Support: Payment s s 5 s Ben220440 Ben220440 Ben220440 8en220440 9070 s 2,482.74 Printed: 11/2612O19 2:49:26PM 7u22/2019 Page 16 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 ETECTRONIC I }AYMEIIT P^YMEf,T BN'EiII vE aDoR |{At{EAt{DruMlli XUlllEi ArrouE DESCilPllo . liflglcE P.O'l . l'AlE l{uMaEi all/lot l{I 006485 - MEDTCAL EYE SERVICES, INC 011.210230 s 020.210230 s 055.210230 s 056.210230 s 0s7.210230 s 020.210230 s 055.210230 s 011.210230 s 020.210230 s 011.210230 s 0ss.210230 s 011.210230 s 011.210230 s 011.1025.502031 s 011.1004.530034 s 3,738.46 Vision lnsurance: Payment 282.61 Vision lnsurance: Payment 543.15 Vision lnsurance: Payment 82.95 Vision lnsurance: Payment 4.18 Vision lnsurance: Payment 20.87 EE0359 Re6red, Credit Due 11.59 EE1073 Separed, Credit Due -18.56 EE1064 Plan Change, Credited -9.28 EE0389 Planfiier Change, Credited -11.59 EE0235 Separed, Credited 29.90 E80130 Unpaid Leave -29.90 EE1139 New Hire, To Be Billed -29.90 EE1140 New Hire, To Be Billed 62.36 COBRA Employees 1.31 Rounding Adjustment 192794L7900r 792794179001 t92794779001 \92794L7900L t92794t79001 192794179001 192794779001 192794L7900L L92794779007 792794L7900L 192194L79001 t92794779007 792794t79007 792794L7900r L92794779007 7u2slzOLs 9071 s 4,778.t6 TOTAL ELECTRONIC s 10,715,256.02 P rinted: 1! 261 2Ol9 2:49:26PM Page 17 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3, 2019 OOO529. EPIC LAND SOLUTIONS, INC 011.1004.59s200 s 4,856.25 lnfrastructure Valuation Services 7190581 17h2l2OL9 504362 s _ 4,856.25 011.1031.596s00 s 108.80 Firearms / Tactical Rifle Operator's 110619006598 - MARCUS FINO OOO121 - LU,S LIGHTHOUSE, INC 011.1045.s20000 011.1M6.520000 25.19 Supplies- 25.19 Supplies" 11s2253 1152364 011.0013909 011.0013909 s s 7tl72l2or9 604364 s 50.38 011.1048.530015 s 602.68 Reimb. Possessory lnterest Tax-092619OO5O74. HECTOR MORENO t].lL2l2019 60436s s 602.68 00327 6 - NATIONAL TRAI N ING 011.1031.596700 s 274.00 Registrafion / M. Fino 110619 001158. SOUTH COAST AQMD 011.1049.596200 s 011.1049.596200 s 011.1049.595200 s 011.1049.596200 s 421.02 Annual Renewal Fees" 421.02 Annual Renewal Fees- 135.40 Emissions Fees 136.40 Emissions Fees 3519448 35794/.9 3522788 3522789 t],lL2l2Ot9 504367 s 1,LL4.84 P tinted i L7 I 26 I 2079 2'.49 :26P M Page 18 of 38 EARTY CHECKS CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 000005 - ATHRONE CO, INC 05s.8100.s96200 0s5.8100.596200 055.8100.596200 011.1043.520000 055.8100.596200 055.8100.596200 05s.8100.596200 84.95 Portable Restroom 309.14 Portable Restroom 88.95 Portable Restroom 111.33 Portable Restroom 84.95 Portable Restroom 279.74 Portable Restroom 88.95 Portable Restroom s s s s s s s 602685 602686 602687 607764 507155 607766 607167 7]^1L4/2079 604368 s 7,047.47 OOL723. AFC HYDRAULIC SEA6 & REPAIR 011.2033.850000 011.2033.850000 011.2033.850000 685.00 ITEM#OI4HOSEASSEMBL- 228.00 ITEM#O14HOSEASSEMBL- 86.74 Sales Tax 9.5% 28969 28959 28969 011.0014108 011.0014108s 5 7u14l2079 604359 s 999.74 OOO345. AIRGAS USA, LLC 011.120010 011.120010 011.120010 011.120010 s s s s 5O2.OO (0623-110) Safety Glasses Elite 318.40 (2999-100) Alcohol ISO 99% Gal. UN1219 72.95 Freight 9093624382 9093624382 9093624382 9093624382 011.0014104 011.0014104 o11.0014104 77.94 Sales Tax 9.5% 604370 s 7,979.40001948 - AT&T Printed: 11/2512019 2i49i26PM 011.9019.590110 s 7,979.40 Period: 09/19/19 - TOlLghg 8218111502 trll4l2}Lg 604371 s Page 19 of 38 EARTY CHECKS CITY OF VERNON OPERATTNG ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2OT9 001948 - AT&T 011.9019.560010 011.9019.550010 5 s 842.48 Period: 09120179 - 7o/t9lr9 215.52 Period: 09/201L9 - r0179119 102019 102019(2) t7lL4/2OL9 604372 s 1,058.00 002889 - AT&T MOBILITY 011.9019.550010 s 47.23 Period'. O9l 09 I 79 - 70/O8l t9 832175480X10162 019 ],ut412079 604373 s 47.23 004448 - BATTERY SYSTEMS, INC 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 95.18 Vehicle Batteries- 266.20 Vehicle Batteries- 256.85 Vehicle Batteries- 95.18 Vehicle Batteries" s s s s 5135939 5148582 5150415 5150895 011.0013870 011.0013870 011.0013870 011.0013870 7uL412079 604374 s 723.47 001973 - CALIFORNIA FMME & AXLE 011.1046.520000 011.1046.520000 011.1046.520000 011.1045.520000 140.00 Front End RePairs" 634.30 Front End RePairs- 508.98 Front End RePairs- 1,259.72 Front End Repairs- s s s s 46369 56354 56577 56755 011.0013871 011.0013871 011.0013871 011.0013871 77lt4l2Ot9 60437s s 2,543.00 ooo778- CALIFORNIAWATERSERVICE 011.1043.550000 s 42.45 Period:10/19 L02219 P tinled : ll I 26 I 2019 2:49 :26P M tr/14/2Or9 504376 s PaEe 20 of 38 CITY OF VERNON OPERATTNG ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 004163. CENTRAL FORD 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1.045.520000 011.1046.s20000 011.1046.520000 011.1046.520000 011.1046.520000 245.43 Auto Parts- 58.95 Auto Parts- 76.07 Auto Parts- 152.47 Auto Parts- 44.72 Auto Parts- 142.77 Auto Parts- 142.73 Auto Parts- 5.54 Auto Parts - 53.21 Auto Parts- 20.09 Auto Parts- 255.31 Auto Parts- 287.37 Auto Parts- 19.66 Auto Parts- s S s s s 5 s s s s 5 S 5 343802 343809 343820 344722 344452 344480 344801 345154 345196 345L97 345203 345242 345323 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 011.0013873 LLl74l2Ot9 604377 5 1,505.32 OO3O88. CLINICAL LAB OF SAN BERNARDINO 020.1084.500140 s 619.00 Lab Services 971308 ltlL4l2oL9 604378 s 619.00 000970 - DANGELO CO 011.1047.520000 011.1047.520000 942.29 Water Parts- 4,090.26 Water Parts- s1379801002 s1382444001 011.0013890 011.0013890 s S 1111412019 604379 s 5,032.55 002556 - DEWEY PEST CONTROL 477.OO P tintedt ll/2612079 2:49:26PM 0s5.8400.s90000 s 417.00 Pest Control Services 456082 LLl74l2O79 504380 s PaSe 2l of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO. 35 DECEMBER 3,2019 .-;"PAYMEI{ICIIBCIPrvilEl{I vExDor ^ME^xDriuMrri '':i::: rulldti Alroiim DEsdi'mox ':'' - l l/olci e.ol IrAIE l{uMaEl : aMouirf EARTY CHECKS 005825. FRONTIER 011.9019.560010 S 55.01 Period: tolt9lT9-tL/15/79 101619 Lt/L412019 604381 5 55.01 006622 - FULLER ENG|NEER|NG, INC 020.1084.500140 S 354.58 Sodium Hypochlorite 020.1084.520000 S 730.64 Sodium Hypochlorite 020.1084.500140 S 274.85 Sodium Hypochlorite 020.1084.520000 S 875.05 Sodium Hypochlorite 139975 139975 140090 140090 tut4l207s 604382 s 2,23s.73 000399-GARVEYEQUIPMENT 011.1046.520000 S 739.05 Parts&Services- COMPANY 011.1046.520000 S 262.80 Parts&Services- 011.1045.520000 S 112.16 Parts & Services- 011.1046.520000 S 378.73 Parts & Services- L23378 0L1.0013874 123381 011.0013874 723849 011.0013874 123938 011.0013874 77/t412O79 604383 s r,492.75 003342-L|BERTYMANUFACTUR|NG, 011.1031.590000 S 351.00 RangeMaintenance tNc 1785 71/t412O19 604384 s 3s1.oo P r inled : 7U 26 I 2079 2 i49 :26P M Page 22 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISIER NO.35 DECEMBER 3,2Ot9 OO39O8. LOPEZ & LOPEZTIRE SERVICE 011.1046.520000 011.1046.520000 011.1045.520000 011.1046.520000 011.1046.520000 01.1.1046.520000 011.1046.520000 011.1046.520000 011.1045.520000 011.1045.520000 s s S s s s s s s s 18.00 Tires, Accessories & Repairs- 875.12 Tires, Accessories & Repairs- 310.10 Tires, Accessories & Repairs- 25.00 Tires, Accessories & Repairs- 1,023.60 Tires, Accessories & Repairs- 35.42 Tires, Accessories & Repairs- 875.12 Tires, Accessories & Repairs- 419.60 Tires, Accessories & Repairs- 20.00 Tires, Accessories & Repairs- 598.30 Tires, Accessories & Repairs- 22672 22748 22801 22876 22825 22833 22873 22878 22888 22892 011.0013875 011.0013875 011.0013875 011.0013875 011.0013875 011.0013875 011.0013875 011.0013875 011.0013875 011.0013875 7ut4l2019 60438s s 4,207.26 OOO3O9- NAPAAUTO PARTS 011.1046.520000 s 852.98 Auto Parts & Accessories-102919_MULTIPLE 011.0013875 tu]4l2079 604385 s 852.98 00527 2. NET TRANSCRIPTS, INC.011.1031.s96200 s 13.50 Transcrip6on Services 28186rN 1uL4/2Ot9 604387 5 13.50 006586 . OCCUPATIONAL HEALTH CENTERS OF 011.1025.597000 s 201.00 Medical Services 6s785014 201.00 Printed: 11/2612019 2:49:26PM LL|7412079 604388 s Page 23 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 005934 - O,REILLY AUTO PARTS 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1045.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1045.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 011.1046.520000 3049247773 304924L8L7 3049242457 3049242452 304924246t 3049242558 30/19243586 3049243587 3049243646 3049244563 3049244709 3049244773 3049245639 3049245645 3049245775 011.0013877 011.OO13877 011.0013877 011.0013877 011.0013877 011.0013877 011.0013877 011.0013877 011.0013877 011.0013877 011.0013877 011.0013877 0L1.0013877 011.0013877 011.0013877 s s s s s S S s s s s s s s s 9.79 Auto Parts & Accessories- 29.54 Auto Parts & Accessories" 118.76 Auto Parts & Accessories- 99.62 Auto Parts & Accessories" 14.55 Auto Parts & Accessories- 114.96 Auto Parts & Accessories" -123.53 Auto Parts & Accessories- -114.96 Auto Parts & Accessories- 43.78 Auto Parts & Accessories- 75.88 Auto Parts & Accessories- 17.09 Auto Parts & Accessories- 17.09 Auto Parts & Accessories- 510.17 Auto Parts & Accessories" 170.75 Auto Parts & Accessories- 49.35 Auto Parts & Accessories- LLlL4l2079 504389 s L,O32.84 003271- ROBERTSON'S 020.1084.520000 020.1084.520000 011.1043.520000 011.1043.520000 7,576.84 Concrete 1,501.45 Concrete 766.28 Concrete 555.15 Concrete s s s s 521960 s29106 561176 s66774 4,499.72 Printed : 11/2612019 2:49 :26P M rr/L412079 604390 s Page 24 of 38 EARLY CHECKS I'AYMEN I AMOUNT ACCOUNT INVOICE VENDOR NAME AND NUMBER NUMBER AMOUITT DESCHPnON CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2OL9 EARTY CHECKS 003775 - SILVA's PRINTING NETWORK 056.5500.520000 S 89.00 Business Cards to read: - 056.5600.520000 S 8.46 SalesTax 9.5% 011.1033.520000 S 79.00 Business Cards to read: - 011.1033.520000 S 7.51 SalesTax9.5% 27044 056.0000591 27044 27057 011.0014113 2705t 71,/L4120L9 604391 s 183.97 005998 - SOUTHEAST POLICE CHIEFS 011.1031.596550 S SoO.o0 Annual Dues 2019-2020 GROUP Lrh4/2O79 604392 s 500.00 0oo758- USA BLUE 6OOX O1!.12(o1O s 119.95 Poly Gren S.mplinS Endosur€ r/ Hasp 43618 011.0014120 011.12@10 J 55.45 (1820'230) Double F€male Hoseswlv.l 43618 011.11014120 011.120010 $ 16.65 SrlesTarg.sr 43514 011.120010 S 359.85 PoV G€en Sampliry En.loruE w/ Hasp 14220 011.014120 011.12@10 s 149.70 (182G880) Hos€ Shutofi 3/4'GHT Hewv 44220 011.@14120 011.12(,010 $ 199.20 13051-ool) BBss Hvdrant AdaPts 2'V2' 44220 011.0014120 011.120010 $ 86.31 FreiSm 44220 01r'00!1120 O11.12ooto S 75.53 salesTarg.5f 44220 11t7412079 604393 3 1.062.6s 19SEC010 001481 - VERIZON WIRELESS 011.9019.560010 S 832.96 Period: 05/19 011.9019.560010 S 828.02 Period:09/19 9831819350 9839802398 LLl74l2O79 604394 s 1,650.98 001481 - VERIZON BUSINESS SERVICES 011'9019.550010 S 624.95 Period:09/19 ru]^4l21tg 604395 s 624.95 Printed: 1112612019 2:49:26PM 7t269959 Page 25 of 38 CIW OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 EARLY CHECKS .I: ' PAYMEI'T CHE'[ PAY EtT WxDoR MttE At{D I{UM!ff ruiilEn AMOUiIT irE$flmox vOrcE P.o!a IrArE I{UillEl AIUOI f,T 001399 - VERNON SANITARY SUPPLY co 011.120010 011.120010 011.120010 011.120010 011.120010 011.120010 s s s s s s 21.84 (051.5-400) AJAX CLEANSER 24 - 21oz CANS 30712300 87.96 (0515-560) Stirrup Quick Change Mop 30712300 150.32 (0578-200) 45114Joy Liquid Dish Soap 30712300 697.32 (0578-400) 13878T|DE Liquid Laundry 30712300 201.16 (0578-590) AJAX Pro Liquid & 3O7L23OO 110.07 SalesTax9.S% 30712300 011.0014106 011.0014106 011.0014106 011.0014105 011.0014106 7u14/2o7s 604396 s r,268.67 000743 - xEROX FTNANCIALSERVICES, 011.9019.590110 s LLC 3,219.30 Lease Payment 1820349 ttl14l20t9 604397 s 3,219.30 004318 - A.BEST INDUSTRIAL, INC 056.5500.900000 s 0s6.s600.900000 s 0s6.s500.900000 s os6.s6oo.9ooo0o s 056.s500.590000 s 056.5600.s90000 s 0s6.s600.s90000 s 056.5600.s90000 $ 056.s600.590000 s 0s6.5600.s90000 5 3,848.83 AB-FS6400-7.5PSlMON" 600.00 Fisher Factory Expedite Fee 53.16 Freight 355.64 SalesTax9.S% 692.10 ltem No. AB-GAUW-4.5'04BT100SSA- 692.10 ltem No. AB-GAUW-4.S'08BT1KSSA- 806.40 ltem No. AB-GAUW-4.5'08BT1.5KSSA- 2,O7 6.30 ltem No. A8-GAUW-4.5'088T800SSA- 96.74 Freight 405.36 Sales Tax 9.5% tN12585 rN12585 rN12585 rN12585 tN12586 tN12586 rN12586 tN12586 tN12586 tN12586 055.0000s88 056.0000588 055.0000588 056.0000583 055.0000583 056.0000583 056.0000583 0s6.0000583 9,546.63 P rinted: 7l/261 2Ol9 2'.49'.26P M L7/19/2Ot9 604398 s Page 26 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER ?,2Ot9 005554 - AMBIENT ENVIRONMENTAL, 011.1049.900000 s rNC 800.00 Abatement Specification r7lL9l2079 604399 s 800.00 011.9019.520010 s 3,500.00 PEAC-WEB Tier ll Facility Worst-Case 2019093002 011.00L4100006303 - ARISTATEK, INC t1.lL9l2oL9 504400 s 3,500.00 OO44L2. CORE & MAIN LP 020.1084.900000 020.1084.900000 020.1084.900000 s s s 4,770.59 AUMA ACTUATOR. SEQ# 10- 598.83 ADAPT ASSY TO MATE SQ1O.2 TO- 510.L0 SalesTax 9.5% 1072835 1072835 1072835 011.0014003 0L1.0014003 LL/t9l2Ot9 604401 s s,879.52 006649 - D&H WATER SYSTEMS, INC 020.1084.840000 020.1084.840000 020.1084.840000 020.1084.840000 020.1084.840000 020.1084.840000 s s s s s s 52,657.18 PAX Mixer Wet AssemblY 8,566.71 Control Center Dry Assembly 1,733.35 130' Conductor Cable 2,910.32 Bond 800.00 Freight 5,990.44 SalesTax9.5% t20t91248 t2019t248 t20191248 t20L9L248 t20191248 r20191248 011.0014055 011.0014055 011.0014055 011.0014055 011.0014055 tut9l2079 604402 s 72,758.OO 001955 - IGNACIO ESTRADA lll 011.1031.595500 s 80.50 EVOC Update 093019 80.50 P tinte4 17 I 26 I 2019 2:49 :26P M 7ut9l2079 604403 s Page 27 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 EARLY CHECKS -- - . rocolrltlr {rtvt taE g YMErt cHEq( PAYllrEl{r vEllDOi l{/llf,E AtlD itu'vtlEn I{UM!Ei Allouitr DEsc mofl fil/olcE t.o.t DAI! IluiaBEn A[ou r ooo524- FTRGUSONWATERWORKs 020.1084.520000 s 3,544.93 18 2508 aLG X 125 FLG EPDM BFV- 691268 011,0014091 020.1084.5200110 I 336.77 SalesTarg.s% 691268 020.1084.52d)00 s 90.51 182N I5OTOBLS|DE LUG BFV BLT SEr- 691318 011.0O1/m91 020.1084.520000 5 8.59 SalesTax9.5%691318 LL/L9/2OL9 604404 s 3,980.80 003248. DANIEL ONOPA 011.L031.596500 S AO.S0 EVOC Update 093019 t]^ltsl2otg 60440s s 80.s0 004451- eUAuTyJETROOTER,tNC 011.1049.590000 S 139.00 PlumblngMaintenance 25827 7u1912O79 604406 s 139.00 006485 - QUENCH USA, INC 011.1049.520000 S 2,329.07 water Filtration Units rNv02059579 LL/7912OL9 604407 s 2,329.07 000074- JosE RAMOS 011.1031.596500 S 20.88 Firearms/Tactical Rifle Adv 111119 711L912019 604408 s 20.88 m4229- SMAADAN SUPPLY CO 055.56m.590001, 5 -367.71 CEdit S14t1,647001 056.5600.590000 $ 721-20 Tc 503727 PaiN krron, tough coat, 53427892001 056.m589 056.5600.s9ln00 S 68.51 Sales T.x 9.sx S3427E920o1 ila9l2o\9 601409 S 422.00 P tinte d: ll / 26 I 2079 2:49 :26P M Page 28 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO. 35 DECEMBER 3,2019 OOO545. VERNON CHAMBER OF COMMERCE 011.1023.5s0000 s 011.1023.550000 s 011.1023.ss0000 s 011.1023.550000 s 011.1002.s50000 s 10,000.00 59th Annual Board lnstallation 15,000.00 42nd Annual Golf Tournament 5,0OO.OO Economic Forecast & lndustry Update 1,000.00 Directory Ads 14,000.00 Directory Ads 9472A 94L28 9472C 9412D 9472D ltlLg/2c.tg 60rt410 S 4s,000.00 011.9019.520010 s 450.00 Data lmport and Data Cleanup 13808331 011.0014102006566 . WATTS REGULATOR COMPANY tLl79l2O7s 504411 s 450.00 011.9019.s90110 s 415.00 Disaster Recovery Services 100996005348. AGILITY RECOVERY SOLUTIONS 11l2Ll2OL9 604412 s 005174 - ALL AMERICAN TROPHY & ENGRAVIN 011.1026.596900 s 2,1tO.07 2019 EE Service Awards 109654 tLl2u2019 604413 s 2,7tO.O7 001948- AT&T 0s5.9000.560010 5 056.5600.560010 s 0s6.5600.560010 s 232.59 Period: 09 I tol t9 - tol09 I 79 610.43 Period: o9/7O179 - 10/O9lt9 2L.22 Period'. 09 I 70 I 19 - tO I 09 I 79 t3727069 73727072 t3727771 Printed: U/25l2019 2:49:26PM Fage 29 of 38 EARTY CHECKS DESCR!PTlON CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 001948 - AT&T 055.9200.s60010 0s5.9200.560010 S S 346.55 Period: 10/79119 - 7tlt8/rg 152.00 Period: o9lt9lt9 - L0/18/19 3772926376 4105041504 7tl2t/2079 604415 s 498.55 000778 - CALTFORNIA WATER SERVICE 011.1033.560000 s 155.88 Period:10/19 to227el2l LLl21l2079 504416 s 1s5.88 011.1046.590000 s 145.00 Labor only to reconnect left front cs1710 011.0014077004163. CENTRAL FORD L!12112O79 6O44t7 s 003856 . COMMERCIAL TIRE COMPANY 011.1046.520000 011.1046.520000 011.1046.590000 011.1046.590000 011.1046.590000 011.1046.520000 s s s s s s 7,027.5O 385/65R22.5 goodyear 296 msa 18 ply 2.04 Tape on weights 3.50 State tire fee 50.00 Labor to dismount and mount front 6res 50.00 Labor to balance front tires 97.81 Sales Tax 9.5% lGS15s931 1GS155931 1GS155931 1GS155931 1GS155931 1GS155931 011.0014075 011,0014075 011.0014075 011.0014075 011.0014075 tt/2712Ot9 604418 5 1,230.85 007444. COUNTY OF LOS ANGELES 011.1033.s96200 s 75,000.00 Partial Reimbursement-041419 7u27lz0te 604419 s 75,000.00 005874. DOUBLETREE BY HILTON 1,200.00 P rinte d, 17 | 26 I 2019 2:49 i26P M 011.1025.s96900 s 1,200.00 3rd Dep. EE Recognition Holiday Event 1.12019 r7l2Ll2Or9 604420 s Page 30 of 38 CIW OF VERNON OPERATING ACCOUNT WARRANT REGTSTER NO.35 DECEMBER 3,2019 001145. EMERSON'S LOCKSMITH CO, tNc 020.1084.520000 020.1084.s20000 020.1084.520000 020.1084.520000 2,57O.4O Yale Padlocks - 24.00 Engravine (COV-W) 25.00 Freight 244.19 Sales Tax 9.5% s s s S 240740 240740 240740 240740 011.0013864 011.0013864 011.0013854 ttl2tl2o79 504421 s 2,863.59 004181 - FRANCHISETAx BOARD 011.210260 011.210260 020.2LO260 055.210260 s s s s 964.00 Garnishment: Payment 242.31 Garnishment: Payment 148.41 Garnishment: Payment 841.00 Garnishment: Payment 8en220412 Ben22O472 Ben22O472 Ben22M12 17l2u2}re 604422 5 2,L95.72 005660 - GRAFIX SYSTEMS 011.1031.570000 s 559.93 Unit 44 Graphics Design & lnstallation 27455 lu2L12079 604423 s 559.93 OOI772. GRAINGER, CO 055.8400.590000 s 1,665.14 Materials & Tools-9284675890 055.0002741 tu2u2019 604424 5 7,665.74 OO4O35. GTO AUTO GLASS 011.1046.590000 s 75.00 Labor only to repair chip on windshield r0492859 011.0014079 Lt/2t/2o7e 60442s s 75.00 OOO445. JOBS AVAILABLE, INC 011.1026.550000 s 390.00 Job Ads-7923026 77/2t12079 604426 s OO18OO. JSB FIRE PROTECTION, LLC 1,788.10 Printed : 11/2612019 2149:26P M 011.1033.595200 s 1,788.10 Plan Check Services 19209 Lu2Ll2079 604427 s Page 31 of 38 EARLY CHECKS ACCOUNT INVOICE NUMBER AMOUT{T DESCRIPTION tNvotc€ I'AY|YIENI AMOUNT CIW OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 EARTY CHECKS ::::tt:|.. _. gaYMEt{, cHEaI DAYMEITaI VEI{I'Of,MT'EAI{DIIUMIE8 M'flEi AMOUI{I DESC PNOI NVOIG P.O' DATE I{UMIET AM'I'I{I 003272- LANGUAGE LINE SERVICES, 011.1031.594200 S 125.59 lnterpretation Services INC 4669551 rtl2Tlz1Ls 604428 s 12s.s9 006422- MARIPoSA LANDSCAPES, INC 011.1049.590000 S 3,582.00 Landscape Maintenance 86646 7u2L/2O19 604429 s 3,s82.00 006203 - MRC SMART TECHNOLOGY 011.9019.590L10 S 12,363.88 Managed Print Services SOLUTIONS rN1245336 LLl2t/2O79 604430 s 12,363.88 005586-OCCUPATIONALHEALTH 011.1026.502095 S 152.97 MedicalServices CENTERS OF 100119 tu2ll2079 604431 s rs2.97 000629-OPENACCESSTECHNOLOGY 055.9200.596200 S 817.25 ElectronicTagging- rNTt- | 151082 055.0002734 71l2u20r9 504432 s 817.2s 005612 - QUALIFIED MOBIIE, INC 011.1046.590000 S 374.00 Car Wash Services 263399 LL/2L/2O79 504433 s 374.00 001457 - QUINN COMPANY 011.1046.520000 5 347.79 388-3718 front rim / wheel 011.1045.520000 S Sr.Z3 Freight 011.1046.520000 S 37.90 SalesTax9.5% PC810867743 011.0014076 PC8LO867743 011.0014075 PC810867743 77l2ll20t9 60M34 s 436.92 P(inted: lU25/2O19 2:49:26PM Page 32 of 38 --- , altouiYl [motcE , Ylrlm CHECI( PAYMET{I vE ooetarrE^l{DxuMaEt uMlEi Aliou!.r oEscdmof, N!/(,cl P.o, DAIE lluilSER auouffi CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 EARLY CHECKS 003149- RICHARDC.SLADE& 020.1084.900000 S 1,758.42 GroundwaterServices ASSOCIATES LL/2u2Ot9 504435 s 1,758.42 oo39oo- nEHAnDS, WATSOI{ & 011.1024.593200 S 94.32 Re: Los AngEles M9l P€rm't P€'tition 223941 GERSHON 7tn+019 604€5 S .32 005044- RONSMAINTENANCE,INC 011.1043.590000 S 13,872.00 CatchBasinCleaning L7/2L12079 604437 s 73,872.OO 003456- RIJSHTRUCI(CENTEROF 011.1046-52()0(D S 335,00 8-9801&7518 egrv.lve 3017080197 011.@11b7E WHfIIICR 011.1046.520000 S 14-74 &9803F507{ e8r valve Sasket 301704)197 011.0014078 011.1046.520000 S 11.74 &97305-&rE eer valE gasl€t 3017040197 011.0014078 011.1046.52(xx)o S 34.35 Sal€sTax9.5* 3017080197 Dta7t2or9 604438 I 39s.a3 5t97 785 003672 - SC FUELS 020.1084.520000 s 2,705.00cH253025981D055 30- 020.1084.s20000 s -45.00 MSRTNDRMCoo1 30- 020.1084.520000 s 75.00 DRUMDEPOSITC0o1 30- 020.1084.520000 S 9.92 Fuel Surcharge 020.1084.52mO0 S 12.95 RegulatoryComplianceFee 020.1084.520000 5 259.24 SalesTax9.5% 1529030rN 011.0014125 1529030tN 011.0014125 1529030rN 011.0014125 1529030rN 011.0014125 1529030tN 011.0014125 1529030rN rr/2L/2O79 504439 s 3,018.11 Printld: 1V26l2019 2:49:26PM Page 33 of 38 CITY OF VERNON OPERATTNG ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 005790 - slMoN wlND, INC 0s5.9000.900000 s 3,487.50 Meteorological Services ttl2L/2Or9 604440 s 3,487.50 001960. SNAP.ON INDUSTRIAL 011.1045.520000 011.1045.S20000 011.1046.520000 s s s 936.75 EESP341V14|N 19.4 modis edge usd 9.94 Freight 89.93 SalesTax9.5% 150ARV41673650 011.0014072 150ARV41673650 011.0014072 150ARV41573650 77l2tl2or9 604441 s 1,036.62 OO2O79 - SO CAL JOINT POLE OOO38O. STACY MEDICAL CENTER 055.9100.s96200 s 784.76 Operating Expense 10/19 011.1031.s96200 011.1031.596200 s s 145.00 Medical Services 800.00 Medical Services 521134602 521135106 tu2rl2079 604443 s 945.00 oo34oo- STATECONTROLLER'SOFFICE 011.1004.595200 s 150.00 Audit Confirmation Listing Fee L11919 Ltl27l2Ot9 504,444 s 150.00 OOO952 - STATE OF CALIFORNIA 011.1049.590000 s 225.00 lnspection Fee E1691576MR 7112L12079 60444s s 225.00 OOO287. STATE WATER RESOURCES CONTROL 2,625.OO P tinte d: 77 / 26 I 2079 2'.49:26PM 020.1084.s96200 s 2,625.00 Annual Permit Fee wD0164154 Lt/2r/2o79 604446 s Page 34 of 38 CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 EARTY CHECKS OOO282 - TRI-CITY MUTUAL WATER COMPANY 011.1033.560000 s 225.00 Hydrant 110119 LLl2tl20t9 604447 5 225.00 007447 . TYTER TECHNOLOGIES, INC 011.9019.s95210 s 320.00 Remote Training Hours - Multiple Modules 45278840 011.0012952 1u2r/2079 604rt48 s 004441. U.S. DEPTOF EDUCATION 011.210260 408.74 Garnishment: Payment 8en220410 t7l2t/2oLs 604449 s 408.74 OOO449 . UNDERGROUND SERVICE ALERT 020.1084.596200 020.1084.595200 s s 156.85 NewTicketCharges 72.58 CA State Fee for Regulatory Costs 1020190781 18DSBFE6059 77l2tl2OL9 6044s0 5 229.53 OO5O3O. UNITED STEEL FENCE COMPANY oss.8000.9ooooo s 3,410.00 Fence Repair 18804 1t/2u2079 6044s1 s 3,410.00 005599. WEBCO LB, LLC 011.1043.590000 s 10,250.00 Street Sweeping Services 10/19 ttl21/2oL9 6044s2 s 10,250.00 TOTAL EARLY CHECKS S 344,78L.a7 P r inted'. ll I 26 I 20 79 2:49 :26P M Page 35 of 38 ridoor urr ^l{o ruriim iJxtsER arioul{r DEiihmo ']l' llll/olcE t.o.I r',::rd5E tttrlgEi Aluouirr CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2OL9 005529. BRIAN BYUN 011.1024.596500 s 102.57 NAPABA Annual Convention 111219 72103/2Ot9 6044s3 s 702.57 003846 - C|TY OF HUNTINGTON PARK 011.1031.594200 s 8,774.24 Prisoner Booking Log 19681 t2l03l2079 6044s4 s 8,Lt4.24 OOO947 . DAILY JOURNAL CORPORATION 011.1003.s50000 011.1003.550000 011.1003.550000 011.1003.550000 011.1003.550000 s s s s s 680.40 Publication Services 621.50 Publication Services 105.00 Publication Services 71.40 Publication Services 71.40 Publication Services 83309358 83309361 83312829 83312835 83312843 7210312019 6044s5 s 1,549.80 OOO452 . EDWARD HERNANDEZ 011.1031.550000 s 31.44 Reimb. Community Outreach Event-7tt2L9 L2/03/2079 604456 s 3r.44 000686 - IGOE & COMPANY, INC 011.1026.594200 s 75.00 Participation Fee 204632 72lO3l2ot9 604457 s 75.00 OOO999 . INTERSTATE GAS SERVICES, tNc 020.1084.595200 s 7,000.00 Consulting Services 702L520 L2l03l20t9 60'1458 S 7,000.00 003660. JACK MEGORDEN 116.00 Prinled: 1112612079 2:49:26PM 055.910O.596600 s 115.0O Reimb. Certificate Renewal-111919 7210312079 6044s9 s Page 36 of 38 WARRANTS VENDOR NAME AND NUMBER PAYMENT CHECK I'AYMtN t P.O.T DATE NUMBER AMOUNT CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO.35 DECEMBER 3,2019 000186. MSW CONSULTANTS 011.1060.59s200 s 2L,328.75 Consulting Services 10/19 284 L2/03/2o1e 604460 s 2L,328.L5 011.1045.590000 s 144.00 Car Wash Services 1005006613- NCM CARWASH t2l03l2o7e 504461 s 144.00 006586 - OCCUPATIONAL HEALTH CENTERS OF 011.1026.597000 s 3,768.50 Medical Services 66028181. t2l03l2oL9 604462 s 3,768.50 005612. QUALIFIED MOBILE, INC 011.1046.590000 s 011.1046.590000 s 425.00 Car Wash Services 238.00 Car Wash Services 263664 263974 r2lo3l2079 604453 s 663.00 TOTATWARRANTS $ 42,892.70 Printed: 1l/2612019 2:49:26PM Page 37 of 38 WARRANTS DESCRIPTION CITY OF VERNON OPERATING ACCOUNT WARRANT REGISTER NO. 35 DECEMBER 3,2019 RECAP BY FUND ELECTRONIC TOTAL EARTY CHECK TOTAL WARRANTTOTAL GRAND TOTATSFUND 011. GENERAL O2O. WATER 055. LIGHT & POWER 055 - NATURAL GAs 057. FIBER OPTIC 6RANDTOTAL TOTAL CHECXS TO 8E PRINTED 11 885,511.87 s 799,349.74 9,609,068.81 16,598.90 4,627.30 $ 10,715,256.02 s 227,700.46 s 99,193.80 13,089.87 70,797.74 0.00 35,775.70 s 7,000.00 116.OO 0.00 0.00 1,142,989.03 305,542.94 9,622,274.68 27,496.64 4,627.30 ?44,781,.87 s 42,892.70 s 11,102,930.59 ,/> Page 38 of 38 P rinled: ll/26 I 2019 2i49t26PM City Council Agenda Item Report Agenda Item No. COV-522-2019 Submitted by: Lisa Pope Submitting Department: City Clerk Meeting Date: December 3, 2019 SUBJECT April 14, 2020 General Municipal Election Recommendation: A. Find that this action is exempt from the California Environmental Quality Act (CEQA) review, because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines Section 15378; B. Adopt a Resolution calling and giving notice of an all-mail ballot General Municipal Election to be held on Tuesday, April 14, 2020 for the election of a City Council Member as required by the provisions of the Charter of the City of Vernon and submitting a ballot measure to amend the Charter related to Mayoral rotation and a ballot measure levying a transactions and use tax to the voters at said election; C. Determine authors of arguments and rebuttals; D. Adopt a Resolution requesting the Board of Supervisors of the County of Los Angeles to render specified services to the City relating the conduct of the General Municipal Election to be held on Tuesday, April 14, 2020; and E. Direct the City Clerk to transmit a copy of the measures to the city attorney for preparation of impartial analyses. Background: Pursuant to Vernon Charter Section 5.1 and Municipal Code Section 2.118, the City of Vernon conducts all-mail ballot General Municipal Elections on the second Tuesday of April each year. The City Council is required to adopt various resolutions to begin the election process. Resolution Calling the Election The first resolution (Attachment 1) calls the election on Tuesday, April 14, 2020, for the election of one member of the City Council for a full five (5) year term and submits two ballot measures to the voters. Charter Amendment Ballot Measure Currently, the Charter dictates that the Mayor and Mayor Pro Tem are selected from the City Council following a regular municipal election. Charter Chapters 3.5 and 3.6 read as follows: Chapter 3.5 - At the Council meeting at which any Council Member is installed following a regular municipal election, and at any time when there is a vacancy in the office of the Mayor, the City Council shall meet and shall elect one of its members as Mayor." Chapter 3.6 - At the time that a Mayor is selected, the City Council shall also designate on of its members as Mayor Pro Tempore." The proposed ballot measure would establish rotation of the Mayor and Mayor Pro Tem positions, rather than having the Council Members vote to elect these positions. A rotational process as prescribed by the proposed ballot measure affords equal opportunities for each Council Member to serve as the City's Mayor and Mayor Pro Tem at some point in their tenure on the City Council. Similar ballot measures were on the April 2019 ballot but were withdrawn due to a technical error on the ballot. Transaction and Use Tax Ballot Measure The City has historically operated with a deficit in its General Fund that was partially alleviated via a transfer of funds from the electric utility each fiscal year, in order to provide essential services to its residents and businesses. While this is common practice among public agencies with their own utilities, it is not viewed as a best practice by rating agencies and regulatory bodies. The City continues to be confronted with its traditional challenges to provide the core services to its residents and businesses of public safety and infrastructure, and to address deferred maintenance projects throughout the City, as well as two additional obstacles in recent years: unfunded pension and Other Post-Employment Benefits (OPEB) liabilities. Although the City adopted a 6% utility users' tax (Measure R) on April 10, 2018, and entered into an agreement with the Fire Protection District of Los Angeles County for fire protection on August 6, 2019, the City still faces financial challenges. The City of Vernon, like municipal jurisdictions throughout the state, receives a 1% Sales and Use Tax pursuant to the Bradley-Burns Uniform Local Sales Tax and Use Law. California state law sets a cap for sales and use tax at 10.25% with a few exceptions as allowed by state legislation. The total sales tax assessed in the City is currently 9.5%, comprised of the following: 6.25% California State Rate 1% County Transportation 1% County Metro Transportation 1% City of Vernon .25% County of Los Angeles Rate (County Homeless Services) The City remains committed to its Good Governance reforms, including fiscal accountability and transparency, financial stability, as well as securing additional sources of revenue that are necessary to retain the City's current levels of service. One option to address budget deficits and build future reserves is the consideration of three-quarter cent (0.75%) local sales tax (technically, a "Transactions and Use Tax"). Proceeds from the tax would be locally protected funds that could be used for maintaining and improving City services including safety, infrastructure, streets and housing. An increase to the City's sales tax would increase the City's revenue by approximately $6 million per year. Arguments and Rebuttals Elections Code Sections 9282 and 9285 allow for submittal of written arguments and rebuttal arguments. At its December 18, 2018 meeting, the Council authorized the Mayor to prepare and file arguments in favor of the proposed ballot measure related to Mayoral rotation. The Council may wish to do the same for these ballot measures. Elections Code Section 9286 requires the elections official to fix the date 14 days from the calling of the election as the deadline for submittal of arguments and Elections Code Section 9285 indicates rebuttal arguments shall be submitted no later than 10 days after the final filing date for primary arguments. Therefore, arguments would be due no later than December 17, 2019, and rebuttals must be submitted by December 30, 2019, since City Hall is closed on Friday, December 27, 2019. Impartial Analysis Elections Code Section 9280 provides for preparation of impartial analyses, showing the effect of the measures, by the City Attorney. The impartial analyses are due at the same as the initial arguments. Candidate Statement Regulations Elections Code Section 13307 allows candidates to prepare a candidate statement for inclusion in the voter's pamphlet. On October 21, 2014, the Council adopted Resolution No. 2014-64 (Attachment 2) adopting regulations regarding candidate statements submitted to voters in a general municipal or special municipal election. This resolution applies to the April 2020 election. Resolution Requesting County Services The second resolution (Attachment 3) requests the services of the Los Angeles County Election Department to provide appropriate forms, and signature verification services, and prepare, print and mail official ballots and ballot materials. Ballot Drop-Off Locations In prior elections, the City has offered an additional ballot drop-off location on election day. No ballots were dropped of at the Vernon Fire Station in the October 2019 Special Municipal Election and only one was dropped of in April 2019 because the resident " was interested in seeing the process". Staff will consider options for providing the best value for voters and will inform voters of such. Nomination Period The nomination period for the April 14, 2020 Election begins December 23, 2019, at which time candidates may obtain nomination papers and required filing materials from the City Clerk Department. The last day to file nomination papers is January 21, 2020 (since City Hall is closed January 17 and 20, 2020). If an incumbent fails to file, the period is extended to January 27, 2020. Fiscal Impact: The proposed Transaction and Use Tax ballot measure is anticipated to generate approximately $6 million annually. Account No. 011.1003.596300 has $21,346 which is expected to be sufficient to cover the cost of the election. ATTACHMENTS 1. Resolution Calling Election 2. Resolution No. 2014-64 regarding Candidate Statements 3. Resolution Requesting County Services RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON, CALIFORNIA, CALLING AND GIVING NOTICE OF AN ALL-MAIL BALLOT GENERAL MUNICIPAL ELECTION TO BE HELD ON TUESDAY, APRIL 14, 2020, FOR THE ELECTION OF A CITY COUNCIL MEMBER AS REQUIRED BY THE PROVISIONS OF THE CHARTER OF THE CITY OF VERNON AND SUBMITTING A BALLOT MEASURE TO AMEND CHAPTERS 3.5 AND 3.6 OF ARTICLE III OF THE CITY CHARTER RELATED TO THE SELECTION OF MAYOR AND MAYOR PRO TEM TO THE VOTERS AND A BALLOT MEASURE LEVYING A TRANSACTION AND USE TAX TO THE VOTERS AT SAID ELECTION WHEREAS, in April 2020, the term of one Vernon City Council Member will expire; and WHEREAS, under the provisions of the Charter of the City of Vernon, a General Municipal Election shall be held on April 14, 2020, for the election of one Municipal Officer; WHEREAS, the City Council also desires to submit to the voters of the City, a ballot measure to amend Chapters 3.5 and 3.6 of Article III of the City Charter; and WHEREAS, Revenue and Taxation Code Section 7285.9 authorizes the City Council to levy a transactions and use tax for general purposes if the ordinance proposing that tax is approved by a two- thirds vote of all members of the City Council and the tax is approved by a majority vote of the qualified voters, therefore, the City Council also desires to submit to the voters of the City, a ballot measure implementing a transaction and use tax. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the above recitals are true and correct. - 2 - SECTION 2: The City Council of the City of Vernon finds that adoption of this resolution is exempt under the California Environmental Quality Act (CEQA), because it is an administrative activity of government that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines Section 15378. SECTION 3: Pursuant to the requirements of the State of California, and the Vernon Charter and Municipal Code, there is called and ordered to be held in the City of Vernon, California, on Tuesday, April 14, 2020, a General Municipal Election conducted by all-mail ballot for the purpose of electing one (1) Member of the City Council for the full term of five (5) years and submitting two ballot measures to the voters. SECTION 4: The City Council, pursuant to its right and authority, does order submitted to the voters at the General Municipal Election the following question: Shall Chapters 3.5 and 3.6 of Article III of the Vernon City Charter be amended to change the process for selecting the Mayor and Mayor Pro Tempore from one by which the other Council Members vote to one by which Council Members are appointed according to an automatic rotation schedule based on year of election? YES NO SECTION 5: The proposed complete text of the measure is as follows: - 3 - The People of the City of Vernon do hereby amend the Charter of the City of Vernon as follows: Chapter 3.5 of Article III of the Charter of the City of Vernon is amended to read as follows: At the Council meeting at which any Council member is installed following a regular municipal election, and at any time when there is a vacancy in the office of Mayor, the position of Mayor shall be filled by the Council Member whose election immediately followed the election of the prior Mayor. For the first year after passage of the Charter Amendment establishing this automatic rotation appointment process, the position of Mayor shall be filled by the Council Member who has served on the City Council for the longest period of time within their respective current terms. In the event any Council Member scheduled to be Mayor is unable or desires not to be Mayor, the position of Mayor shall be filled by the Council Member who was elected to the City Council in the year immediately following that person. The Mayor shall be the presiding officer of the City Council. The Mayor shall be a member of the City Council for all purposes and shall have all the rights, powers and duties of a member of the City Council in addition to those powers and duties conferred upon the Mayor by virtue of his or her office. The Mayor shall be the official head of the City for all ceremonial purposes. The Mayor shall perform such other duties consistent with the office of mayor as may be prescribed by this Charter or as may be provided by the City Council. The Mayor shall serve in his or her capacity at the pleasure of the City Council and may be removed by a majority vote of the members of the City Council. Chapter 3.6 of Article III of the Charter of the City of Vernon is amended in its entirety to read as follows: At the time that a mayor is appointed, the position of Mayor Pro Tempore shall be filled by the Council Member whose election immediately followed that of the newly appointed Mayor. For the first year after passage of the Charter Amendment establishing this automatic rotation appointment process, the position of Mayor Pro Tempore shall be filled by the Council Member who has served on the City Council for the next-to-longest period of time within their respective current terms. In the event any Council Member scheduled to be Mayor Pro Tempore is unable or desires not to be Mayor Pro Tempore, the position of Mayor Pro - 4 - Tempore shall be filled by the Council Member who was elected to the City Council in the year immediately following that person. The Mayor Pro Tempore shall serve in such capacity at the pleasure of the City Council and may be removed by a majority vote of the members of the Council. The Mayor Pro Tempore shall perform the duties of the Mayor during the Mayor's absence or disability. SECTION 6: The vote requirement for the Charter Amendment measure to pass is a majority (50%+1) of the votes cast. SECTION 7: The City Council, pursuant to its right and authority, does order submitted to the voters at the General Municipal Election the following question: To maintain and improve city services including safety, infrastructure, streets and housing, shall the ordinance to increase the sales tax by three-quarter of one percent, providing up to $6 million annually, be adopted? YES NO SECTION 8: The full text of the ordinance authorizing the transactions and use tax to be approved by the voters, entitled “The City of Vernon Transactions and Use Tax Ordinance” is attached as Exhibit A to this resolution. The full text of the ordinance shall be printed in the Voter Information Pamphlet. SECTION 9: The vote requirement for the measure to pass is a majority (50%+1) of the votes cast. SECTION 10: The ballots to be used at the election shall be in form and content as required by law. SECTION 11: The City Clerk is authorized, instructed and - 5 - directed to procure and furnish any and all official ballots, notices, printed matter and all supplies, equipment and paraphernalia that may be necessary in order to properly and lawfully conduct the election by all mail ballot. SECTION 12: Pursuant to the City of Vernon Municipal Code, and other applicable provisions of the Charter of the City of Vernon and Ordinances of the City of Vernon, the Election shall be conducted by all-mail ballot, and shall be conducted pursuant to Chapter 2 of Division 4 (commencing with Section 4100) of the California Elections Code only insofar as required by law, and only where not inconsistent with the Charter and Ordinances of the City of Vernon. Notwithstanding Elections Code Section 4103, ballots cast in this Election shall be returned to the Office of the City Clerk no later than 8:00 p.m. on election day in order to be counted. Ballots that are postmarked on election day and received no later than three (3) days following the day of the election will also be counted. SECTION 13: In the event of a tie vote (if any two or more persons receive an equal and the highest number of votes for an office) as certified by the Election Official, the City Council, in accordance with Election Code Section 15651(b), shall conduct a special runoff election to resolve the tie vote and such special runoff election is to be held on a Tuesday not less than 40 days nor more than 125 days after the administrative or judicial certification of the election which resulted in a tie vote. SECTION 14: In all particulars not recited in this resolution, the Election shall be held and conducted as provided by law for holding municipal elections. SECTION 15: Notice of the time and place of holding the - 6 - Election is given and the City Clerk is authorized, instructed and directed to give further or additional notice of the election, in time, form and manner as required by law. SECTION 16: The City Council of the City of Vernon authorizes the City Clerk to administer said Election and all reasonable and actual election expenses shall be paid by the City upon presentation of a properly submitted bill. SECTION 17: The City Clerk of the City of Vernon shall certify to the passage, approval and adoption of this resolution, and the City Clerk of the City of Vernon shall cause this resolution and the City Clerk’s certification to be entered in the File of Resolutions of the Council of this City. APPROVED AND ADOPTED this 3rd day of December, 2019. Name: Title: Mayor / Mayor Pro-Tem ATTEST: Lisa Pope, City Clerk APPROVED AS TO FORM: Zaynah Moussa, Senior Deputy City Attorney - 7 - STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, Lisa Pope, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. , was duly passed, approved and adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Tuesday, December 3, 2019, and thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. Executed this day of December, 2019 at Vernon, California. Lisa Pope, City Clerk (SEAL) EXHIBIT A ORDINANCE NO. AN ORDINANCE OF THE CITY OF VERNON ADDING CHAPTER 20A OF THE VERNON MUNICIPAL CODE TO ENACT A TRANSACTIONS AND USE TAX TO BE ADMINISTERED BY THE STATE BOARD OF EQUALIZATION, UPON ADOPTION BY THE VOTERS THE PEOPLE OF THE CITY OF VERNON DO HEREBY ORDAIN: SECTION 1: Chapter 20A, which shall be titled “TRANSACTIONS AND USE TAX,” is hereby added to the Vernon Municipal Code, as follows: CHAPTER 20A TRANSACTIONS AND USE TAX Section 20A.1. Transactions and Use Tax. (a) Purpose. This Section is adopted to achieve the following, among other purposes, and directs that the provisions hereof be interpreted in order to accomplish those purposes: (1) To impose a retail transactions and use tax to be applied throughout the entire territory of the City to the fullest extent permitted by law and in accordance with the provisions of Part 1.6 (commencing with Section 7251) of Division 2 of the Revenue and Taxation Code and Section 7285.9 of Part 1.7 of Division 2, which authorizes the City to adopt this ordinance if a majority of the electors voting on the measure vote to approve the imposition of the tax at an election called for that purpose. (2) To adopt a retail transactions and use tax ordinance that incorporates provisions identical to those of the Sales and Use Tax Law of the State of California insofar as those provisions are not inconsistent with the requirements and limitations contained in Part 1.6 of Division 2 of the Revenue and Taxation Code. (3) To adopt a retail transactions and use tax ordinance that imposes a tax and provides a measure therefore that can be administered and collected by the California Department of Tax and Fee Administration in a manner that adapts itself as fully as practicable to, and requires the least possible deviation from, the existing statutory and administrative procedures followed by the California Department of Tax and Fee Administration in administering and collecting the California State Sales and Use Taxes. - 2 - (4) To adopt a retail transactions and use tax ordinance that can be administered in a manner that will be, to the greatest degree possible, consistent with the provisions of Part 1.6 of Division 2 of the Revenue and Taxation Code, minimize the cost of collecting the transactions and use taxes, and at the same time, minimize the burden of record keeping upon persons subject to taxation under the provisions of this ordinance. (5) To provide transactions and use tax revenue to the City to be used for general purposes. (b) Contract with State. Prior to the operative date, the City shall contract with the California Department of Tax and Fee Administration to perform all functions incident to the administration and operation of this transactions and use tax ordinance; provided, that if the City shall not have contracted with the California Department of Tax and Fee Administration prior to the operative date, it shall nevertheless so contract and in such a case the operative date shall be the first day of the first calendar quarter following the execution of such a contract. (c) Transactions Tax Rate. For the privilege of selling tangible personal property at retail, a tax is hereby imposed upon all retailers in the incorporated territory of the City at the rate of three-quarters of one percent (0.75%) of the gross receipts of any retailer from the sale of all tangible personal property sold at retail in said territory on and after the operative date of this Chapter. (d) Place of Sale. For the purposes of this Chapter, all retail sales are consummated at the place of business of the retailer unless the tangible personal property sold is delivered by the retailer or his agent to an out-of- state destination or to a common carrier for delivery to an out-of-state destination. The gross receipts from such sales shall include delivery charges, when such charges are subject to the state sales and use tax, regardless of the place to which delivery is made. In the event a retailer has no permanent place of business in the State or has more than one place of business, the place or places at which the retail sales are consummated shall be determined under rules and regulations to be prescribed and adopted by the California Department of Tax and Fee Administration. - 3 - (e) Use Tax Rate. An excise tax is hereby imposed on the storage, use or other consumption in the City of tangible personal property purchased from any retailer on and after the operative date of this Chapter for storage, use or other consumption in said territory at the rate of three-quarters of one percent (0.75%) of the sales price of the property. The sales price shall include delivery charges when such charges are subject to state sales or use tax regardless of the place to which delivery is made. (f) Adoption of Provisions of State Law. Except as otherwise provided in this Chapter and except insofar as they are inconsistent with the provisions of Part 1.6 of Division 2 of the Revenue and Taxation Code, all of the provisions of Part 1 (commencing with Section 6001) of Division 2 of the Revenue and Taxation Code are hereby adopted and made a part of this Chapter as though fully set forth herein. (g) Limitations on Adoption of State Law and Collection of Use Taxes. In adopting the provisions of Part 1 of Division 2 of the Revenue and Taxation Code: (1) Wherever the State of California is named or referred to as the taxing agency, the name of this City shall be substituted therefor. However, the substitution shall not be made when: (A) The word "State" is used as a part of the title of the State Controller, State Treasurer, State Board of Control, California Department of Tax and Fee Administration, State Treasury, or the Constitution of the State of California. (B) The result of that substitution would require action to be taken by or against this City or any agency, officer, or employee thereof rather than by or against the California Department of Tax and Fee Administration, in performing the functions incident to the administration or operation of this Chapter. (C) In those sections, including, but not necessarily limited to sections referring to the exterior boundaries of the State of California, where the result of the substitution would be to: (i) Provide an exemption from this tax with respect to certain sales, storage, use or other consumption of tangible - 4 - personal property which would not otherwise be exempt from this tax while such sales, storage, use or other consumption remain subject to tax by the State under the provisions of Part 1 of Division 2 of the Revenue and Taxation Code, or; (ii) Impose this tax with respect to certain sales, storage, use or other consumption of tangible personal property which would not be subject to tax by the state under the said provision of that code. (D) In Sections 6701, 6702 (except in the last sentence thereof), 6711, 6715, 6737, 6797 or 6828 of the Revenue and Taxation Code. (2) The word "City" shall be substituted for the word "State" in the phrase "retailer engaged in business in this State" in Section 6203 and in the definition of that phrase in Section 6203. (h) Permit not required. If a seller's permit has been issued to a retailer under Section 6067 of the Revenue and Taxation Code, an additional transactor's permit shall not be required by this Chapter. (i) Exemptions and Exclusions. (1) There shall be excluded from the measure of the transactions tax and the use tax the amount of any sales tax or use tax imposed by the State of California or by any city, city and county, or county pursuant to the Bradley-Burns Uniform Local Sales and Use Tax Law or the amount of any state-administered transactions or use tax. (2) There are exempted from the computation of the amount of transactions tax the gross receipts from: (A) Sales of tangible personal property, other than fuel or petroleum products, to operators of aircraft to be used or consumed principally outside the county in which the sale is made and directly and exclusively in the use of such aircraft as common carriers of persons or property under the authority of the laws of this State, the United States, or any foreign government. (B) Sales of property to be used outside the City which is shipped to a point outside the City, pursuant to the contract of sale, by delivery to such point by the retailer or his agent, or by delivery by the retailer to a carrier for shipment to a consignee at such point. For the purposes of this paragraph, delivery to a point outside the City shall be satisfied: - 5 - (i) With respect to vehicles (other than commercial vehicles) subject to registration pursuant to Chapter 1 (commencing with Section 4000) of Division 3 of the Vehicle Code, aircraft licensed in compliance with Section 21411 of the Public Utilities Code, and undocumented vessels registered under Division 3.5 (commencing with Section 9840) of the Vehicle Code by registration to an out-of-City address and by a declaration under penalty of perjury, signed by the buyer, stating that such address is, in fact, his or her principal place of residence; and (ii) With respect to commercial vehicles, by registration to a place of business out-of-City and declaration under penalty of perjury, signed by the buyer, that the vehicle will be operated from that address. (C) The sale of tangible personal property if the seller is obligated to furnish the property for a fixed price pursuant to a contract entered into prior to the operative date of this Chapter. (D) A lease of tangible personal property which is a continuing sale of such property, for any period of time for which the lessor is obligated to lease the property for an amount fixed by the lease prior to the operative date of this Chapter. (E) For the purposes of subparagraphs (3) and (4) of this section, the sale or lease of tangible personal property shall be deemed not to be obligated pursuant to a contract or lease for any period of time for which any party to the contract or lease has the unconditional right to terminate the contract or lease upon notice, whether or not such right is exercised. (3) There are exempted from the use tax imposed by this Chapter, the storage, use or other consumption in this City of tangible personal property: (A) The gross receipts from the sale of which have been subject to a transactions tax under any state-administered transactions and use tax ordinance. (B) Other than fuel or petroleum products purchased by operators of aircraft and used or consumed by such operators directly and exclusively in the use of such aircraft as common carriers of persons or property for hire or compensation under a certificate of public convenience and necessity issued pursuant to the laws of this State, the United States, or any foreign government. This exemption is in addition to the exemptions provided in Sections 6366 and 6366.1 of the Revenue and Taxation Code of the State of California. - 6 - (C) If the purchaser is obligated to purchase the property for a fixed price pursuant to a contract entered into prior to the operative date of this Chapter. (D) If the possession of, or the exercise of any right or power over, the tangible personal property arises under a lease which is a continuing purchase of such property for any period of time for which the lessee is obligated to lease the property for an amount fixed by a lease prior to the operative date of this Chapter. (E) For the purposes of subparagraphs (3) and (4) of this section, storage, use, or other consumption, or possession of, or exercise of any right or power over, tangible personal property shall be deemed not to be obligated pursuant to a contract or lease for any period of time for which any party to the contract or lease has the unconditional right to terminate the contract or lease upon notice, whether or not such right is exercised. (F) Except as provided in subparagraph (7), a retailer engaged in business in the City shall not be required to collect use tax from the purchaser of tangible personal property, unless the retailer ships or delivers the property into the City or participates within the City in making the sale of the property, including, but not limited to, soliciting or receiving the order, either directly or indirectly, at a place of business of the retailer in the City or through any representative, agent, canvasser, solicitor, subsidiary, or person in the City under the authority of the retailer. (G) "A retailer engaged in business in the City" shall also include any retailer of any of the following: vehicles subject to registration pursuant to Chapter 1 (commencing with Section 4000) of Division 3 of the Vehicle Code, aircraft licensed in compliance with Section 21411 of the Public Utilities Code, or undocumented vessels registered under Division 3.5 (commencing with Section 9840) of the Vehicle Code. That retailer shall be required to collect use tax from any purchaser who registers or licenses the vehicle, vessel, or aircraft at an address in the City. (4) Any person subject to use tax under this Chapter may credit against that tax any transactions tax or reimbursement for transactions tax paid to a district imposing, or retailer liable for a transactions tax pursuant to Part 1.6 of Division 2 of the Revenue and Taxation Code with respect to the sale to the person of the property the storage, use or other consumption of which is subject to the use tax. (j) Amendment or Repeal. - 7 - (1) All amendments subsequent to the effective date of this Chapter to Part 1 of Division 2 of the Revenue and Taxation Code relating to sales and use taxes and which are not inconsistent with Part 1.6 and Part 1.7 of Division 2 of the Revenue and Taxation Code, and all amendments to Part 1.6 and Part 1.7 of Division 2 of the Revenue and Taxation Code, shall automatically become a part of this Chapter, provided however, that no such amendment shall operate so as to affect the rate of tax imposed by this Chapter. (2) The City Council may amend this Chapter without voter approval only to make minor technical adjustments consistent with the purposes set forth in this Chapter and applicable laws or as necessary to comply with the law. (k) Enjoining Collection Forbidden. No injunction or writ of mandate or other legal or equitable process shall issue in any suit, action or proceeding in any court against the State or the City, or against any officer of the State or the City, to prevent or enjoin the collection under this Chapter, or Part 1.6 of Division 2 of the Revenue and Taxation Code, of any tax or any amount of tax required to be collected. (l) Severability. If any provision of this Chapter or the application thereof to any person or circumstance is held invalid, the remainder of the Chapter and the application of such provision to other persons or circumstances shall not be affected thereby. (m) Use of Proceeds. The proceeds from the transactions and use tax imposed by this Chapter shall be deposited in the general fund of the City and available for any lawful governmental purpose. (n) Annual Audit. The amount generated by this new general purpose revenue source shall be included in the annual audit of the City’s financial operations by an independent certified public accountant. SECTION 2: Any ordinance or parts of ordinances in conflict with this Ordinance are hereby repealed. - 8 - SECTION 3: Severability. If any chapter, article, section, subsection, subdivision, paragraph, sentence, clause, phrase, or word in this Ordinance or any part thereof is for any reason held to be unconstitutional or invalid or ineffective by any court of competent jurisdiction, such decision shall not affect the validity or effectiveness of the remaining portions of this Ordinance or any part thereof. The City Council hereby declares that it would have adopted this Ordinance and each chapter, article, section, subsection, subdivision, paragraph, sentence, clause or phrase thereof, irrespective of the fact that any one or more chapters, articles, sections, subsections, subdivisions, paragraphs, sentences, clauses, phrases or words be declared unconstitutional, or invalid, or ineffective. SECTION 4: Book of Ordinances. The City Clerk shall attest and certify to the adoption of this Ordinance and shall cause this Ordinance and the City Clerk’s certification to be entered in the Book of Ordinances of the Council of this City. The City Clerk shall cause this ordinance to be published or posted as required by law. /// /// /// /// /// /// /// /// /// - 9 - SECTION 5: Effective Date. This Ordinance shall go into effect if approved by a majority of the voters of the City of Vernon at the general municipal election to be held on April 14, 2020, and shall be executed by the Mayor upon certification by the City Council of the results of the election approving this ordinance. APPROVED AND ADOPTED this ____ day of ___________ 20__. Name: Title: Mayor / Mayor Pro-Tem ATTEST: Lisa Pope, City Clerk APPROVED AS TO FORM: Brian Byun, Senior Deputy City Attorney - 4 - STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, Lisa Pope, City Clerk of the City of Vernon, do hereby certify that the foregoing Ordinance, being Ordinance No. was approved by the voters of the City of Vernon, at the general municipal election held in the City of Vernon on Tuesday, April 14, 2020, and thereafter adopted at a meeting of said City Council held on Tuesday, , by the following vote: AYES: Councilmembers: NOES: Councilmembers: ABSENT: Councilmembers: And thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. Executed this ___ day of ___________, 20__, at Vernon, California. Lisa Pope, City Clerk (SEAL) RESOLUTION NO. 2014-64 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON REPEALING RESOLUTION NO. 2012-209 AND ADOPTING REGULATIONS REGARDING CANDIDATE STATEMENTS SUBMITTED TO VOTERS IN ANY GENERAL MUNICIPAL OR SPECIAL MUNICIPAL ELECTION WHEREAS, Section 13307 of the Elections Code of the State of California provides that the governing body of any local agency shall adopt regulations pertaining to materials prepared by any candidate for a municipal election, including costs of the candidate's statement; and WHEREAS, on November 6, 2012, the City Council of the City of Vernon adopted Resolution No. 2012-209 adopting regulations for candidates for elective office pertaining to candidate statements submitted to the voters at any general municipal or special municipal election; and WHEREAS, the City Council desires to repeal Resolution No. 2012-209 and adopt regulations regarding candidates statements submitted to the voters in any general or special municipal election. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the above recitals are true and correct. SECTION 2: The City Council of the City of Vernon finds that this action is exempt under the California Environmental Quality Act (CEQA), in accordance with Section 15061(b)(3), the general rule that CEQA only applies to projects that may have an effect on the environment. SECTION 3: GENERAL PROVISIONS. Pursuant to Section 13307 of the Elections Code of the State of California, each candidate for ATTACHMENT 2 elective office to be voted for in any general municipal or special municipal election, may prepare a candidate's statement on an appropriate form provided by the City Clerk. The statement may include the name, age and occupation of the candidate, and a brief description of no more than 200 words of the candidate's education and qualifications expressed by the candidate himself or herself. The statement shall not include party affiliation of the candidate, nor membership or activity in partisan political organizations. The statement shall be filed in typewritten form in the office of the City Clerk at the time the candidate's nomination papers are filed. An electronic copy of the candidate statement should also be submitted to the office of the City Clerk when filing. The statement may be withdrawn, but not changed, during the period for filing nomination papers and until 5:00 p.m. of the next working day after the close of the nomination period. SECTION 4: FOREIGN LANGUAGE POLICY. a. Pursuant to the Federal Voting Rights Act, the City is required to translate candidate statements into the following languages: Spanish. b. Pursuant to state law, the candidate may elect to have their candidate statement translated into any other additional foreign language(s). C. The City Clerk shall have all candidate statements translated into the languages required by the Federal Voting Rights Act and those additional languages requested by the candidate(s). SECTION 5: PAYMENT. The City Clerk shall print an English and Spanish voter information pamphlet to be mailed to all voters which shall include any additional translations of candidates who so 2 - request printing in the voter information pamphlet. All translations will be made available upon request in the City Clerk's Office. a. The candidate shall be required to pay for the cost of translating the candidates statement into any required foreign language and any other language(s) he or she has elected. The City Clerk shall select the person who provides the foreign language translation pursuant to the criteria set forth in Elections Code Section 13307(b). b. The candidate shall be required to pay the cost of printing, handling and mailing the candidate statement in English and Spanish in the voter information pamphlet, and be required to pay for said costs associated with their selection to include any other foreign language(s) in the voter information pamphlet. C. The City Clerk shall estimate the total cost of printing, handling, translating, and mailing the candidate's statements filed pursuant to the Elections Code, and require each candidate filing a statement to pay in advance to the local agency his or her estimated pro rata share as a condition of having his or her statement included in the voter information pamphlet. Actual costs vary from one election to another. The actual candidate statement filing cost for a given election may be significantly more or less than the estimate, depending on the actual number of candidates who file statements. Accordingly, the City Clerk is not bound by the estimate and may, on a pro rata basis, bill the candidate for the additional actual expense or refund any excess amount paid, depending on the final actual cost. In the event of underpayment, the City Clerk may require the candidate to pay the balance of the cost incurred. In the event of overpayment, the City Clerk shall prorate 3 - the excess amount among the candidates and refund the excess amount paid within 30 days of the election. d. The City Clerk shall comply with all applicable State statutes, regulations, standards and guidelines published by the Secretary of State regarding candidates' statements, ballot designations and other procedural items. SECTION 6: ADDITIONAL MATERIALS. No candidate will be permitted to include additional materials in the sample ballot package. SECTION 7: The City Clerk shall provide each candidate or the candidate's representative a copy of this Resolution at the time nomination documents are issued. SECTION 8: All previous resolutions establishing Council policy on payment for candidates' statements, specifically Resolution No. 2012-20,9, are hereby repealed. SECTION 9: This resolution shall apply at the next ensuing general municipal or special municipal election and at each general municipal or special municipal election until repealed. 4 - SECTION 10: The City Clerk, or Deputy City Clerk, of the City of Vernon shall certify to the passage, approval and adoption of this resolution, and the City Clerk, or Deputy City Clerk, of the City of Vernon shall cause this resolution and the City Clerk's, or Deputy City Clerk's, certification to be entered in the File of Resolutions of the Council of this City. APPROVED AND ADOPTED this 21st day of October, 2014. ATTEST: L/ Ana BUC" Cei-t—y-tx]s. / Deputy City Clerk 010, a r , ms i r Name: W. Michael MCCOrmick Title: Mayor 5 - STATE OF CALIFORNIA ) ss COUNTY OF LOS ANGELES ) I, Aria Barcia , / Deputy City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 2014-64, was duly passed, approved and adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Tuesday, October 21, 2014, and thereafter was duly signed by the Mayor or Mayor Pro -Tem of the City of Vernon. Executed this 23 day of October, 2014 at Vernon, California. SEAL) 6 - A`sa Bar yam'/ Deputy City Clerk RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON, CALIFORNIA, REQUESTING THE BOARD OF SUPERVISORS OF THE COUNTY OF LOS ANGELES TO RENDER SPECIFIED SERVICES TO THE CITY RELATING TO THE CONDUCT OF A GENERAL MUNICIPAL ELECTION TO BE HELD ON TUESDAY, APRIL 14, 2020 WHEREAS, a General Municipal Election will be held in the City of Vernon on April 14, 2020; and WHEREAS, in the course of conducting the election it is necessary for the City to request services of the County of Los Angeles; and WHEREAS, all necessary expenses in performing these services shall be paid by the City of Vernon. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the above recitals are true and correct. SECTION 2: The City Council of the City of Vernon finds that adoption of this resolution is exempt under the California Environmental Quality Act (CEQA), because it is an administrative activity of government that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines Section 15378. SECTION 3: Pursuant to the provisions of Elections Code Section 10002, the Vernon City Council requests that the Los Angeles County Board of Supervisors permit the County Election Department to provide the following services for use in conducting its election: - 2 - 1. Provide appropriate forms for candidate statements, arguments and rebuttals and other forms required by the County; 2. Provide signature verification services as needed; 3. Print and mail official ballots and sample ballot booklet; and 4. Prepare and mail multilingual ballot materials in accordance with the Voting Rights Act. SECTION 4: The City shall reimburse the County for services performed when the work is completed and upon presentation to the City of a properly approved bill. SECTION 5: The City Clerk of the City of Vernon shall certify to the passage, approval and adoption of this resolution, and the City Clerk of the City of Vernon shall cause this resolution and the City Clerk’s certification to be entered in the File of Resolutions of the Council of this City. APPROVED AND ADOPTED this 3rd day of December, 2019. Name: Title: Mayor / Mayor Pro-Tem ATTEST: Lisa Pope, City Clerk APPROVED AS TO FORM: Zaynah Moussa, Senior Deputy City Attorney - 3 - STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, Lisa Pope, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. , was duly passed, approved and adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Tuesday, December 3, 2019, and thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. Executed this day of December, 2019 at Vernon, California. Lisa Pope, City Clerk (SEAL) City Council Agenda Item Report Agenda Item No. COV-533-2019 Submitted by: Michael Earl Submitting Department: City Administration Meeting Date: December 3, 2019 SUBJECT Resolution Appointing Tilahun (Abraham) Alemu to Serve as General Manager of Public Utilities and Approving and Authorizing the Execution of a Related At-Will Employment Agreement Recommendation: A. Find that approval of the proposed actions are exempt from California Environmental Quality Act (CEQA) review, because they are administrative activities that will not result in direct or indirect physical changes in the environment, and therefore do not constitute a "project" as defined by CEQA Guidelines section 15378; and B. Adopt a resolution appointing Tilahun Alemu to Serve as General Manager of Public Utilities for the City of Vernon effective December 3, 2019, and approving and authorizing the execution of a related at-will employment agreement. Background: The General Manager position became vacant effective April 4, 2019 upon the resignation of the previous General Manager. Effective May 7, 2019, Tilahun (Abraham) Alemu was appointed as Interim General Manager of Public Utilities in order to ensure that the Public Utilities Department was not without leadership and to maintain continuity and efficient operations until a recruitment for a permanent appointment could be conducted. The recruitment period to find a permanent replacement began October 10, 2019 and ran through November 10, 2019. The City received forty-five applications and resumes. Of those applications received, twenty-six met or exceeded the minimum qualifications for the position. Following an in depth review of the application materials submitted, nine candidates were determined to be the most highly qualified and were invited to participate in the interview process which was conducted on November 20, 2019. Three final candidates were recommended by the external interview panel for final consideration. Final interviews with the three candidates were conducted on November 26, 2019. The City Administrator is recommending the appointment of Tilahun (Abraham) Alemu to serve as General Manager of Public Utilities for the City of Vernon. CANDIDATE BACKGROUND Prior to his appointment as Interim General Manager, Mr. Alemu served in a leadership and management role in the Public Utilities Department as the Integrated Resources Manager. Mr. Alemu has over 26 years of experience in the Public Utilities Department at the City of Vernon and has served in several capacities during his professional career, progressing from Electrical Engineering Assistant, Assistant Power Engineer, Associate Engineer, Resource Engineer, Electric Resources Planning and Development Manager, and presently Integrated Resources Manager. As such, he is familiar with the intricacies of the City's infrastructure, internal staff and departmental needs. In his role as Interim General Manager, Mr. Alemu has provided valuable leadership during this transitional period in the department. Mr. Alemu possesses a Bachelor's degree in Electrical Engineering, and is registered as a Professional Engineer in Electrical Engineering which add to his qualifications to serve as General Manager and his ability to effectively plan, design, implement, and maintain solutions within the Public Utilities Department that directly impact the residents and businesses of Vernon. Mr. Alemu competed among a pool of very highly qualified applicants from other public utilities throughout California and nationally. Given Mr. Alemu's qualifications, education, work experience, training and familiarity with the Public Utilities Department's programs, services, policies and procedures, and projects, he is well suited to serve as the City’s next General Manager of Public Utilities and his appointment is recommended by the City Administrator. Mr. Alemu is to be appointed at step 4 ($23,088) of the established salary range for the General Manager of Public Utilities position as listed on the City’s publicly available salary schedule and will receive benefits consistent with other executive management classifications as set forth in the City’s Fringe Benefits and Salary Resolution. Salary placement at this step in the salary range is due to his salary as Integrated Resource Manager which includes base salary and longevity pay not available for executive positions. Fiscal Impact: There is no additional cost to fill this position due to the current vacancy in the Public Utilities Department. ATTACHMENTS 1. Resolution Appointing Tilahun (Abraham) Alemu to Serve as General Manager of Public Utilities RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPOINTING TILAHUN (ABRAHAM) Y. ALEMU TO SERVE AS THE GENERAL MANAGER OF PUBLIC UTILITIES OF THE CITY OF VERNON AND APPROVING AND AUTHORIZING THE EXECUTION OF A RELATED AT-WILL EMPLOYMENT AGREEMENT WHEREAS, on October 10, 2019, the Human Resources Department initiated the recruitment process to fill the vacancy of the General Manager of Public Utilities; and WHEREAS, the Human Resources Department created an executive recruitment brochure for the position (attached hereto as Exhibit A) and conducted a broad and extensive recruitment that included multiple screenings and interviews of numerous applicants by internal and external raters; and WHEREAS, on November 26, 2019, the City Administrator conducted final interviews of the highest ranking candidates; and WHEREAS, by memorandum dated December 3, 2019, the City Administrator has recommended Tilahun (Abraham) Y. Alemu (“Alemu”) to the City Council of the City of Vernon as the most qualified candidate and initiated the pursuit of the employment of Alemu as the General Manager of Public Utilities of the City of Vernon, subject to City Council’s approval; and WHEREAS, the City Council of the City of Vernon desires to appoint Alemu to serve as the General Manager of Public Utilities, effective December 3, 2019. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby - 2 - finds and determines that the above recitals are true and correct. SECTION 2: The City Council of the City of Vernon finds that this action is exempt from California Environmental Quality Act (CEQA) review, because it is a general administrative activity that will not result in direct or indirect physical changes in the environment and therefore does not constitute a “project” as defined by CEQA Guidelines Section 15378. SECTION 3: The City Council of the City of Vernon hereby appoints Tilahun (Abraham) Y. Alemu to serve as the General Manager of Public Utilities of the City of Vernon, effective December 3, 2019. SECTION 4: The City Council of the City of Vernon hereby approves and authorizes the execution of the At-Will Employment Agreement with Alemu to serve as General Manager of Public Utilities of the City of Vernon, in substantially the same form as the copy which is attached hereto as Exhibit B. SECTION 5: The City Clerk, or any authorized officer, shall administer the Oath of Office prescribed in the Constitution of the State of California to Alemu and shall have him subscribe to it and file it with the Human Resources Department. SECTION 6: The City Council of the City of Vernon hereby directs the City Clerk, or the City Clerk’s designee, to give a fully executed Agreement to Alemu. / / / / / / / / / / / / / / / - 3 - SECTION 7: The City Clerk of the City of Vernon shall certify to the passage, approval and adoption of this resolution, and the City Clerk of the City of Vernon shall cause this resolution and the City Clerk’s certification to be entered in the File of Resolutions of the Council of this City. APPROVED AND ADOPTED this 3rd day of December, 2019. Name: Title: Mayor / Mayor Pro-Tem ATTEST: Lisa M. Pope, City Clerk APPROVED AS TO FORM: __ Zaynah Moussa, Senior Deputy City Attorney - 4 - STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, Lisa M. Pope, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. , was duly passed, approved and adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Tuesday, December 3, 2019, and thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. Executed this day of December, 2019, at Vernon, California. Lisa M. Pope, City Clerk (SEAL) EXHIBIT A Invites your interest for the position of GENERAL MANAGER OF PUBLIC UTILITIES CITY OF VERNON THE COMMUNITY The City of Vernon is an industrial city of 5.2 square miles located about five miles southeast of downtown Los Angeles. Founded in 1905 as the first exclusively industrial city in the Southwestern United States, Vernon remains largely industrial with an approximate residential population of 250. THE ORGANIZATION The five members of the Vernon City Council are elected at large, on a non-partisan basis, for five year staggered terms and, as a result of 2011 Charter amendments, no person may serve more than two full terms of office. The Mayor is selected by the Council. The City’s total budget for FY 2019-20 is a little over $329 million (the General Fund budget is approximately $59 million) with a little over 260 employees. Vernon continues on the path towards creating greater accountability and transparency with the goal to create a model government. THE PUBLIC UTILITIES DEPARTMENT The City of Vernon Public Utilities Department serves as an essential resource to the city’s residents and business community, providing dependable, high-quality utility services at very competitive rates. VPU provides water, electricity, natural gas and fiber optic services to Vernon based businesses and its residents, often at a cost savings compared to neighboring utility providers. The City-owned water, electric, natural gas and fiber optic distribution systems have a strong, established history of reliability, capable of efficiently and successfully serving the needs of the City’s unique community. The Vernon Public Utilities Department is made up of the following divisions: The City of Vernon offers a challenging opportunity to a highly knowledgeable and experienced manager to lead the City of Vernon’s Public Utilities (VPU) Department. If you are interested in this unique and rewarding opportunity, please apply online at www.cityofvernon.org no later than Sunday, November 10, 2019. Administration Natural Gas Compliance Resource Management/Planning Customer Service Operations Engineering Water Fiber Optics THE POSITION Under administrative direction, the General Manager provides leadership and direction over the activities of the City’s Public Utilities Department. The General Manager of Public Utilities plans, directs, and coordi- nates through subordinate staff, the Department’s work plan; assigns projects and program areas of responsibility; reviews and evaluates work methods and procedures; meets with key staff to identify and resolve problems. The General Manager also determines the overall Departmental organizational structure, mission, core services and allocation of financial, human, and capital resources; develops and administers annual capital and operating budgets; and serves as a technical advisor to the City Administrator and the City Council regarding the City’s public utilities. A complete description of the duties and responsibilities of this position can be found on the City’s website. THE IDEAL CANDIDATE The ideal candidate is someone who has the ability to lead others in carrying out the mission, vision and goals of the City and the Public Utilities Department. He/She must possess the organizational and time management skills to manage multiple divisions and responsibilities. The ideal candidate should be an experienced leader with extensive knowledge in the electric field of Public Utilities. He/She must have excellent listening and communication skills to build professional and collaborative working relationships. He/She must be decisive and be able to clearly communicate their decisions and vision to others. REQUIRED TRAINING, EDUCATION AND EXPERIENCE Bachelor’s Degree in Business, Civil or Electrical Engineering or a closely related field; AND ten years of utility operations experience, including five years of supervisory or management experience. (Supervisory/management experience in Public Utilities electric field is highly desirable.) CERTIFICATE AND LICENSE REQUIREMENTS A valid California State Driver’s License is required. A valid State of California Grade II Water Distribution License is desirable. COMPENSATION The monthly salary range for this position is $19,945 - $24,243. Salary placement within the established salary range depends upon qualifications. A comprehensive benefits package is also available. The City has a 4/10 work schedule. HOW TO APPLY For an opportunity to work for an outstanding, dynamic, and progressive City committed to establishing itself as a model for good governance, please visit our website at www.cityofvernon.org and apply online. The City of Vernon is an Equal Opportunity Employer. REQUIRED APPLICATION MATERIALS INCLUDE A resume and completed City of Vernon online application. Filing Deadline: Application materials must be submitted online no later than 11:59 p.m., Sunday, November 10, 2019. If you have any questions, please contact Michael Earl, Director of Human Resources at (323) 583-8811 ext.239 or via email at: mearl@ci.vernon.ca.us EXHIBIT B December 2019 AT-WILL EMPLOYMENT AGREEMENT (NON-SAFETY) BETWEEN THE CITY OF VERNON AND TILAHUN Y.ALEMU This Agreement is between the City of Vernon (“City”) and Tilahun Y. Alemu (“Employee”). Recitals City desires to employ Employee as an at-will employee in the position of General Manager of Public Utilities. Employee desires to be the General Manager of Public Utilities and acknowledges that such employment is at-will. The City Administrator, pursuant to the authority granted by the City of Vernon Charter and City Council, agrees to hire Employee, as an at-will employee, subject to the terms and conditions identified below. AGREEMENT Section 1: TERM The effective date of this Agreement shall be December 3, 2019. Either party may terminate this Agreement pursuant to the provisions set forth below. Employee is an at-will employee and may be terminated, with or without cause, upon thirty (30) days written notice. Employee may resign with thirty (30) days advance notice as set forth in Section 8 below. Section 2: DUTIES A. City engages Employee as the General Manager of Public Utilities to perform the functions and duties specified in the job description for the position (Attachment “A”, incorporated herein by this reference), as the same may be modified by the City Administrator, from time to time, and to perform such other legally permissible and proper duties and functions as the City Administrator shall, from time to time, assign. B. Employee agrees that to the best of his ability and experience that he will at all times conscientiously perform the duties and obligations required, either express or implied, by the terms of this Agreement, the ordinances, resolutions and adopted policies of the City of Vernon and the laws and regulations of the State of California and the United States. C. As a public employee, Employee is required to work a full and complete work week pursuant to the established work schedule as determined by the City Administrator, and devote whatever time is necessary to fulfill the employment responsibilities and duties as identified in this Agreement. D. During the term of this Agreement, Employee is required to have and maintain a valid California Driver’s license. E. Employee acknowledges that in connection with the performance of his duties, he will obtain information from City employees and third parties that is of a confidential nature. Employee agrees that he will not disclose such confidential information other than to officers - 2 - December 2019 and employees of the City who have been authorized to have access to such information. Employee further agrees that if he has a question as to the confidentiality of information obtained in the course of his employment, he will contact the City Attorney for advice. Section 3: EXCLUSIVE EMPLOYMENT Employee agrees to focus his professional time, ability and attention to City business during the term of this Agreement. Consequently, Employee agrees not to engage in any other business pursuits, whatsoever, directly or indirectly, render any services of a business, commercial, or professional nature to any other person or organization, for compensation, without the prior written consent of the City Administrator. This does not preclude Employee from volunteering his services to other entities or individuals as long as such volunteer services are not in conflict with the services to be provided by Employee under this Agreement. Section 4: COMPENSATION As compensation for the services to be rendered by Employee, City agrees to pay Employee a base starting salary of no less than $23,088, per month, payable in twenty-six (26) biweekly installments at the same time as other employees of the City are paid and subject to customary withholding. Salary adjustments (merit increases), if any, in Employee’s salary during the term of this Agreement shall be at the sole discretion of the City Administrator based upon the City Administrator’s evaluation of Employee’s job performance and within the base salary range established by the City Council or as otherwise approved by the City Council. Any and all adjustments shall be in accordance with City personnel policies and procedures. Employee’s salary shall be reflected in the City’s publicly available salary schedule. Section 5: BENEFITS A. Retirement As an employee of the City of Vernon, Employee will be enrolled in the California Public Employees Retirement System (PERS) retirement plan, as such plan may be amended by the City Council. As of the date of this employment agreement, such plan includes the 2.7% at 55 benefit formula for “classic” miscellaneous employees or the 2.0% at 62 benefit formula for “new” miscellaneous employees. The Employee pays for the employee contribution to PERS and any additional amounts as specified in the City’s Fringe Benefits and Salary Resolution. B. Other Executive Management Benefits Employee shall receive all benefits specified by the then current Resolutions of the City Council of Vernon for Executive Management Staff, including, without limitation, those related to Vacation, Administrative Leave, Holidays, Sick Leave, Medical and Dental Insurance, Life Insurance, Flexible Benefits Plans, Vision Care, Other Leaves, and Deferred Compensation, and other types of leave in accordance with the Personnel Policies and Procedures Manual. Section 6: TERMINATION AND SEVERANCE PAY A. Employee is an at-will employee and serves at the will and pleasure of the City Administrator and may be terminated at any time, without cause, subject to the conditions of paragraphs B and C of this section. - 3 - December 2019 B. In the event that Employee is terminated by the City Administrator for reasons other than physical or mental incapacity, and other than those reasons noted in paragraph E, below, the City agrees to pay the employee a severance amount equal to six (6) months of base salary. C. To be eligible for severance pay, as identified in paragraph B, of this section, Employee shall fulfill all of his obligations under this Agreement and shall sign a severance agreement and release of all claims against the City. D. All severance payments shall be paid within thirty (30) calendar days of the date Employee executes the severance agreement and release of claims against the City. E. Notwithstanding paragraphs A, B and C, above, if Employee resigns or retires, or is terminated due to insubordination, incapacity, dereliction of duty, violation of the City’s Alcohol and Drug-Free Workplace Policy III-1, conviction of a crime involving moral turpitude or involving personal gain to him or abuse of his office or position or any felony or for a breach of this Agreement, City shall have no obligation to pay any severance provided in this section. Furthermore, Employee agrees that any severance provided shall be fully reimbursed to the City if the Employee is convicted of a crime involving an abuse of his office or position. F. Upon termination, Employee shall be paid for all earned, but unused, vacation time. Section 7: ABUSE OF OFFICE OR POSITION If Employee is paid leave salary during a pending investigation, any salary provided for that purpose shall be fully reimbursed to the City if Employee is convicted of a crime involving an abuse of his office or position. If Employee is provided funds for any legal criminal defense during his employment with the City, any funds provided for that purpose shall be fully reimbursed to the City if the Employee is convicted of a crime involving an abuse of his office or position. If this Agreement is terminated, any cash settlement related to the termination that Employee may receive from the City shall be fully reimbursed to the City if Employee is convicted of a crime involving an abuse of his office or position. Section 8: RESIGNATION / RETIREMENT Employee may resign at any time. Employee may retire, provided he/she is eligible for retirement, at any time. Employee agrees to provide thirty (30) calendar days advance written notice of the effective date of his resignation or retirement. In the event Employee retires or resigns, Employee shall be entitled to payment for earned, but unused, vacation time, but not to severance pay as delineated in Section 6, paragraph B, above. Section 9: DISABILITY If Employee is permanently disabled or otherwise unable to perform his duties because of sickness, accident, injury, mental incapacity or health for a period of thirty (30) calendar days beyond any earned sick leave, City shall have the option to terminate this Agreement; however, the City’s option to terminate under this Section shall be limited by its obligation to engage in the interactive process for reasonable accommodations and to provide reasonable accommodations as required by law. Nothing in this Section shall be construed to limit or restrict Employee’s - 4 - December 2019 benefits or rights under workers’ compensation or the Public Employees Retirement System (“PERS”). However, an employee terminated under this section is not eligible for severance pay, as delineated in Section 6 of this Agreement. In cases of disability, Employee shall be compensated for any earned, but unused, vacation leave. Section 10: GENERAL PROVISIONS A. Notice Any notices required by this Agreement shall be in writing and either delivered in person or by first class, certified, return receipt requested US Mail with postage prepaid. Such notice shall be addressed as follows: TO CITY: City Administrator City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 TO EMPLOYEE: Tilahun Y. Alemu [Deliver to last updated address in personnel file] B Entire Agreement The text of this Agreement shall constitute the entire and exclusive agreement between the parties. All prior oral or written communications understanding or agreements between the parties, not set forth herein, shall be superseded in total by this Agreement. No Amendment or modification to this Agreement may be made except by a written agreement signed by the Employee and the City Administrator and approved as to form by the City Attorney. C Assignment This Agreement is not assignable by either the City or Employee. D Severability In the event that any provision of this Agreement is finally held or determined to be illegal or void by a court having jurisdiction over the parties, the remainder of this Agreement shall remain in full force and effect unless the parts found to be void are wholly inseparable from the remaining portions of this Agreement. E. Effect of Waiver The failure of either party to insist on strict compliance with any of the terms, covenants, or conditions in this Agreement by the other party shall not be deemed a waiver of that term, covenant or condition, nor shall any waiver or relinquishment of any right or power at any one time or times be deemed a waiver or relinquishment of that right or power for all or any other time or times. - 5 - December 2019 F. Jurisdiction Any action to interpret or enforce the terms of this Agreement shall be held exclusively in a state court in Los Angeles County, California. Employee expressly waives any right to remove any such action from Los Angeles County. G. Effective Date This Agreement shall take effect on December 3, 2019. [Signatures Begin on Next Page]. - 6 - December 2019 IN WITNESS WHEREOF, the City of Vernon has caused this Agreement to be signed and executed on its behalf by its City Administrator, and executed by the Employee. City of Vernon, a California charter City and California municipal corporation Dated: By: Carlos R. Fandino Jr., City Administrator ATTEST: Lisa M. Pope, City Clerk Approved as to form: Hema Patel, City Attorney - 7 - December 2019 In signing this Agreement, Employee understands and agrees that his employment status is that of an at-will employee and that his rights to employment with the City are governed by the terms and conditions of this Agreement rather than the ordinances, resolutions, and policies of the City of Vernon which might otherwise apply to employees of the City. Employee further acknowledges that he was given the opportunity to consult with an attorney prior to signing this Agreement. Signed: Dated: Employee - 8 - December 2019 ATTACHMENT A Job Description City Council Agenda Item Report Agenda Item No. COV-521-2019 Submitted by: Todd Dusenberry Submitting Department: Public Utilities Meeting Date: December 3, 2019 SUBJECT Access and License Agreement with the Water Replenishment District of Southern California Recommendation: A. Find that approval of the proposed action is exempt from California Environmental Quality Act (CEQA) review because it is an administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a “project” as defined by CEQA Guidelines § 15378. Furthermore, even if the proposed action were subject to CEQA review, the action is exempt in accordance with CEQA Guidelines § 15061(b)(3), the general rule that CEQA only applies to activities that may have a significant effect on the environment, for the reason that any construction that may occur in the future relying on this approval would be- and has been- subject to CEQA review at that time and the Department of Toxic Substances Control (DTSC) would be- and has been- the lead agency; B. Approve an Access and License Agreement with the Water Replenishment District of Southern California, in substantially the same form as submitted, in the amount of twenty-seven thousand dollars ($27,000) per year and adjusted annually based upon increases in the Consumer Price Index; and C. Authorize the City Administrator to execute the Access and License Agreement for an initial term of twenty years, with an option to extend the term for four additional five-year terms. Background: As a member of the Los Angeles Forebay Groundwater Taskforce (“Taskforce”), the City of Vernon (“City”) has been working with the Water Replenishment District of Southern California (“WRD”) since 2012 to address regional groundwater contamination. One of the contaminated sites of concern is located at 2306 East 38th Street. The site was previously occupied by an AAD Distribution/Dry Cleaning Facility (“AAD”). AAD managed hazardous waste from various dry cleaning facilities. The site was abandoned in the year 2000 along with 1,600 drums of hazardous waste materials which were later removed by the Environmental Protection Agency (EPA) under a superfund emergency response action. City staff supports this project as it utilizes State funding secured by WRD in order to help maintain a high quality water supply within the City. In the absence of this project, it is possible for the contaminant to migrate into City sources of water supply. Since then, volatile organic compounds (VOC) and perchlorate were detected in nearby monitoring wells. The perchlorate detections in the area of concern are among some of the highest in the state. WRD received a grant from the State Water Resources Control Board (SWRCB) to remediate the perchlorate contamination plume. WRD’s grant agreement has a work completion date (i.e., project duration) of February 28, 2023. In the near future, WRD will begin the first phase of the remediation, which consists of drilling three extraction wells and ten monitoring wells at various locations throughout the City. In accordance with the Remedial Investigation Work Plan approved by DTSC, the monitoring wells will help WRD define the span of the plume and the extraction wells will remediate the perchlorate contamination along with other comingled constituents (e.g., VOCs). Once the thirteen wells are drilled and a Remedial Design Report is finalized, WRD will install a groundwater treatment system on the City’s property identified by Assessor Identification Number 6302-013-900, which is located on the northwest corner of Irving Street and 38th Street. The property is currently being utilized for storage and temporary parking purposes. The licensing of the property does not interfere with any future development plans for the property. The City does have the ability to terminate the License at any time upon 30 days prior written notice if, in the City’s reasonable determination, the License materially interferes with City’s or its lessees’ ability to use or develop the Site. The Access and License Agreement with the Water Replenishment District of Southern California has been reviewed and approved as to form by the City Attorney's Office. Fiscal Impact: If approved, WRD shall pay the City an annual lease and site access fee of twenty-seven thousand dollars ($27,000.00) per year, payable each year on July 1st, and adjusted annually based upon increases in the Consumer Price Index. WRD shall pay the City a prorated amount of thirteen thousand five hundred dollars ($13,500.00) for the period of January 1, 2020 through June 30, 2020. The initial term of the agreement is twenty years, with an option to extend the term for four additional five-year terms. ATTACHMENTS 1. Access and License Agreement with Water Replenishment District 1 ACCESS AND LICENSE AGREEMENT This Access and License Agreement (“License”) is made and entered into on __________________ _____, 2019, by and between the City of Vernon (“Licensor” or “City”), a California charter City and California municipal corporation and the Water Replenishment District of Southern California (“WRD or Licensee”) together referred to as the (“Parties”) with respect to the following: WHEREAS, Licensor is the owner of real property (Assessor Identification Number 6302-013-900) having an area of 6,419 square feet (“SF”) and located at the northwest corner of Irving Street and 38th Street in Vernon, CA 90058 (hereinafter referred to as “Site”); and WHEREAS, WRD is responsible for managing the groundwater supplies for 43 cities in south Los Angeles County; and WHEREAS, WRD uses monitoring wells to provide the information needed to track regional groundwater quality trends, groundwater levels and flow directions in the potable aquifers of the Central Basin; and WHEREAS, WRD will use the groundwater treatment system to remediate impacted groundwater in the general vicinity of the Site and protect and restore the potable aquifers of the Central Basin; and WHEREAS, Licensor receives much of its water supply from local wells, and therefore it is very important to ensure plentiful and high-quality water in the City and southern Los Angeles County; and WHEREAS, WRD will hire, at its sole cost and expense, a contractor and consultant (hereinafter referred to as “Subcontractors”) to perform the work contemplated under the Scope of Work; and WHEREAS, WRD requests permission and access from Licensor to install and operate a groundwater treatment system in conjunction with its Subcontractors at the Site; and WHEREAS, Licensor wishes to grant WRD access to the Site pursuant to the terms and conditions of this License so WRD and its subcontractors can conduct the Scope of Work attached hereto as Exhibit “A”, incorporated herein by this reference, and to provide access for continual operation of the groundwater treatment system by WRD. NOW, THEREFORE, it is mutually agreed by and between the undersigned Parties as follows: 1. Recitals The above recitals are true and correct and are incorporated herein by this reference. 2 2. License Licensor grants to WRD and subcontractors a revocable and non-transferable license to enter the Site to conduct the work defined in the Scope of Work, which will or may include the following: Location: northwest corner of Irving Street and 38th Street in Vernon, CA 90058, as defined in the Scope of Work. Staging Area: Upon the execution of this License, Licensor and WRD shall agree upon a location for the work area for activities necessary or prudent to complete work at the Site. If needed, WRD, at its sole expense, shall install a temporary fence and gates around the perimeter of the work area to maintain work area security, safety and reduce interference with the work. Scope of Work: WRD in cooperation with its subcontractors shall conduct all work necessary to complete the Scope of Work. All sampling and installation activities shall be conducted in compliance with the Scope of Work. The License is only valid with respect to the activities described in the Scope of Work and for continual operation and maintenance of the groundwater treatment system until termination of the License pursuant to the paragraph below. This License contemplates any and all actions deemed necessary by WRD and its subcontractors in preparation for or termination of those activities. Licensor does not grant permission for the performance of any other activities not previously agreed upon in a signed writing by both parties. Duration: It is intended by the Parties that this License shall continue for a period of twenty (20) years. Licensee shall have the right to extend this term for four (4) additional five (5) year terms. Each five-year term is referred to as a renewal term on the same terms and conditions set forth herein, provided Licensee is not in default of this License. This License shall be binding on all successors and assigns. Notwithstanding the foregoing term, Licensor may terminate this License at any time upon 30 days prior written notice if, in the Licensor’s reasonable determination, this License materially interferes with CITY OF VERNON’s or its lessees’ ability to use or develop the Site. WRD may terminate this License at any time and for any reason upon 30 days prior written notice to Licensor. Should Licensor terminate this License prior to expiration of its term, Licensor shall refund the WRD the pro-rata share of the access fee with its notice of termination. Fees: WRD shall pay the Licensor an annual lease / Site access fee of twenty-seven thousand dollars ($27,000.00) per year, payable each year on July 1st, and adjusted annually based upon increases in the Consumer Price Index for All Urban Consumers (CPI-U), All Items Index, Los Angeles-Anaheim-Riverside Area (1982-84=100) (as may be amended from time to time, the “CPI”) for the twelve-month period ending March 31 of each year Upon execution and approval, WRD shall pay Licensor a prorated amount of thirteen thousand- five hundred dollars ($13,500.00) for the period of January 1, 2020 thru June 30, 2020. 3. Manner of Work Prior to the start of any work contemplated under this License, WRD agrees to coordinate with Licensor. 3 WRD agrees to utilize its best efforts to minimize noise, fumes, dust, fluids and other similar effects in conducting the Scope of Work and shall not otherwise interfere with the operations of the Site and/or businesses operating within Licensor’s borders adjacent to the Site. 4. Insurance WRD shall provide, prior to commencement of the Scope of Work, to Licensor evidence of the following insurance procured by WRD for WRD liability: Commercial General Liability: $1,000,000 per occurrence and $2,000,000 aggregate for bodily injury and property damage. The following coverage shall also be included: premises/operations; products completed operations; contractual, independent contractors; broad form property damage and personal injury. The City of Vernon, its directors, commissioners, officers, employees, agents, and volunteers must be endorsed on the policy as additional insureds as respects liability arising out of the WRD performance of this agreement. WRD agrees to subrogate General Liability resulting from performance under this agreement by agreeing to defend, indemnify and hold harmless, the City, and its respective employees, agents, and City Council from and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney’s fees (“Claims”). Contractors Pollution Liability: The Parties to this License acknowledge that WRD does not carry a stand-alone pollution liability policy. WRD agrees to have each contractor on Site carry pollution liability coverage in the amount indicated. Licensor shall be named as the certificate holder. Policy limit shall provide coverage of no less than $1,000,000 per claim and in the aggregate. Coverage shall apply to bodily injury; property damage, including loss of use of damaged property or of property that has not been physically inured; cleanup costs; and costs of defense, including costs and expenses incurred in the investigation, defense, or settlement of claims. Comprehensive Automobile Liability Insurance: $1,000,000 combined single- limit per accident for bodily injury or property damage. The following coverage shall be included: owned automobiles, hired automobiles, not-owned automobiles. WRD agrees to subrogate automobile liability resulting from performance under this agreement by agreeing to defend, indemnify and hold harmless, the City, and its respective employees, agents, and City Council from and against all claims, liabilities, suits, losses, damages, injuries and expenses, including all costs and reasonable attorney’s fees (“Claims”), which are attributable to any act or omission by the City under the performance of the services. Workers’ Compensation and Employer Liability: Workers’ Compensation limits as required by the Labor Code of the State of California and employer liability limits of $2,000,000 per accident. Each insurance policy included in this clause shall be endorsed to state that coverage shall not be cancelled except after thirty (30) days' prior written notice to City. Insurance shall be placed with insurers with an AM Best rating of no less than A-VIII. Prior to commencement of performance, Contractor shall furnish City with a certificate of insurance for 4 each policy. Each certificate is to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificate(s) must be in a form approved by City. City may require complete, certified copies of any or all policies at any time. 5. Indemnification WRD shall indemnify Licensor its officers, elected officials, employees and agents against, and will hold and save each of them harmless from, any and all actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities (herein “claims or liabilities”), including but not limited to professional negligence, that may be asserted or claimed by any person, firm or entity arising out of or in connection with the work, operations or activities of WRD, its agents, employees, subcontractors, or invitees, provided for herein, or arising from the acts or omissions of WRD hereunder, or arising from WRD’s performance of or failure to perform any term, provision, covenant or condition of this Agreement, except to the extent such claims or liabilities arise from the negligence or willful misconduct of City, its officers, elected officials, agents or employees. 6. Restoration of Property Promptly after performing the Scope of Work, WRD shall restore the Site to the condition that existed prior to the execution of this License. Said groundwater treatment system shall be terminated in accordance with all applicable regulations. 7. Monitoring Activities WRD intends to conduct sampling at the Site on an on-going and continuing basis in accordance with the attached Scope of Work. 8. Maintenance of Groundwater Treatment System WRD is solely responsible for the maintenance and operation of the groundwater treatment system installed as outlined in the Scope of Work. 9. Compliance with Applicable Laws WRD agrees that all activities performed pursuant to this License shall comply with all applicable local, state and federal laws, including, but not limited to, resolutions, statutes, regulations, codes, rules and ordinances. 10. Governing Law This License shall be governed by and interpreted pursuant to California law, without regard to its conflict of laws principles. 5 11. Entire Agreement The terms and conditions set forth herein constitute the entire understanding of the Parties relating to the subject matter of this License. This License may be amended only by written instrument signed by both Parties. 12. Waste Disposal All soils and other wastes generated at the Site during completion of the Scope of Work shall be timely and properly disposed of by WRD and its Subcontractors in accordance with all federal, state and local laws. WRD shall be designated as the ‘generator’ on any and all non- hazardous or hazardous waste manifests required to be prepared as part of the work authorized by this License. 13. Relationship of the Parties The Parties expressly disavow any intent or desire to create a partnership, joint venture, joint enterprise, principal and agent, or any or other business relationship by entering into this License other than that of licensor and licensee. 14. Counterparts This License may be executed in counterparts, each of which shall be deemed an original, but all of which, taken together, shall constitute one and the same instrument. 15. Notices If to the Licensor: City of Vernon 4305 South Santa Fe Avenue Vernon, CA 90058 ATTN: Abraham Alemu, Interim General Manager of Public Utilities Tel: (323) 583-8811 If to WRD: Water Replenishment District of Southern California 4040 Paramount Boulevard Lakewood, CA 90712 ATTN: Brian Partington, Manager of Hydrogeology Email: bpartington@wrd.org Tel: 562-921-5521 Fax: 562-921-6101 [SIGNATURES FOLLOW ON NEXT PAGE] 6 IN WITNESS WHEREOF, Licensor and WRD have caused this License to be executed by their respective duly authorized representatives as of the dates set forth below. CITY OF VERNON, a California charter City and California municipal corporation By: _______________________________________ Name and Title: Carlos Fandino, City Administrator Date: ATTEST: _______________________________ Lisa Pope, City Clerk APPROVED AS TO FORM: _______________________________ Brian Byun, Senior Deputy City Attorney WATER REPLENISHMENT DISTRICT OF SOUTHERN CALIFORNIA By: Name and Title: Robb Whitaker, General Manager Date: APPROVED AS TO FORM Leal ▪ Trejo APC, Attorney for the Water Replenishment District of Southern California EXHIBIT A SCOPE OF WORK 1 WRD with the assistance of the Department of Toxic Substances Control (DTSC) is conducting a groundwater investigation to further characterize and cleanup a perchlorate ‘hot spot” generally located at the intersection of Saco Street and 37th Street in Vernon, CA. A groundwater treatment system will be installed to treat perchlorate and other constituents required to discharge water to the local stormwater system under the National Pollution Discharge Elimination System (NPDES) permit. The treatment system components are currently being designed and will be documented in an agency-approved Remedial Design Report. WRD in coordination with its subcontractors will operate the treatment system and will need continuous access to the Site. The groundwater treatment system installation will take approximately four months to complete with subcontractors generally working between the hours of 7:00 a.m. to 7:00 p.m. The Owner will be provided with regular updates and all work will be conducted under the direct supervision of a full-time construction manager hired by WRD. A more detailed description of the work and project schedule will be provided in the Remedial Design Report. Upon request, all data collected will be provided at no expense to Licensor.