20201215 City Council Agenda Packet
Agenda
City of Vernon
Regular City Council Meeting
Tuesday, December 15, 2020, 09:00 AM
City Hall, Council Chamber
4305 Santa Fe Avenue
Vernon, California
Leticia Lopez, Mayor
Melissa Ybarra, Mayor Pro Tem
William Davis, Council Member
Carol Menke, Council Member
Diana Gonzales, Council Member
SPECIAL REMOTE PROTOCOLS
In accordance with Governor Newsom's Executive Order N -29-20, this will be a teleconference
meeting without a physical location to help stop the spread of COVID -19. This meeting will be
conducted entirely by remote participation via Zoom Webinar.
The public is encouraged to view the meeting at http://www.cityofvernon.org/webinar-cc or by
calling (408) 638-0968, Meeting ID 967-0858-6946#.
You may submit comments to PublicComment@ci.vernon.ca.us with the subject line “December
15, 2020 City Council Meeting Public Comment Item #__.” Comments received prior to 8 a.m.,
Tuesday, December 15, 2020, will be read into the record.
CALL TO ORDER
FLAG SALUTE
ROLL CALL
APPROVAL OF THE AGENDA
PUBLIC COMMENT
At this time the public is encouraged to address the City Council on any matter that is within the
subject matter jurisdiction of the City Council. The public will also be given a chance to comment
on matters which are on the posted agenda during City Coun cil deliberation on those specific
matters.
Regular City Council Meeting Agenda
December 15, 2020
Page 2 of 5
CONSENT CALENDAR
All matters listed on the Consent Calendar are to be approved with one motion. Items may be
removed from the Consent Calendar by any member of the Council. Those items removed will be
considered immediately after the Consent Calendar.
1. City Clerk
Approval of Minutes
Recommendation:
Approve the December 1, 2020 Regular City Council meeting minutes.
1. 20201201 City Council Minutes
2. City Clerk
Claims Against the City
Recommendation:
Receive and file the claim submitted by Christina Cicione on behalf of State Farm
Mutual Insurance a/s/o Leydi Y. Sanchez in the amount of $3,617.68.
1. 20201203 Cicione, C. - State Farm
3. Finance/Treasury
City Payroll Warrant Register
Recommendation:
Approve City Payroll Warrant Register No. 774, for the period of November 1 through
November 30, 2020, which totals $4,014,048.08 and consists of ratification of direct
deposits, checks and taxes totaling $3,061,210.91 and ratification of checks and
electronic fund transfers (EFT) for payroll related disbursements totaling $952,837.17
paid through operating bank account.
1. City Payroll Account Warrant Register No. 774
4. Finance/Treasury
Operating Account Warrant Register
Recommendation:
Approve Operating Account Warrant Register No. 58, for the period of November 15
through November 28, 2020, which totals $9,099,407.66 and consists of ratification of
electronic payments totaling $8,952,303.19 and ratification of the issuan ce of early
checks totaling $147,104.47.
1. Operating Account Warrant Register No. 58
5. Fire Department
Fire Department Activity Report
Recommendation:
Receive and file the September 2020 Report.
1. Fire Department Activity Report - 09/01/20 to 09/30/20
Regular City Council Meeting Agenda
December 15, 2020
Page 3 of 5
6. Police Department
Police Department Activity Report
Recommendation:
Receive and file the October 2020 Report.
1. Police Department Activity Report – October 2020
7. Public Works
Arbor Day Foundation Application for Tree City USA
Recommendation:
A. Find that the proposed action is not subject to the California Environmental Quality
Act (CEQA) as this application is not considered a “project” under CEQA which i s
defined as an action directly undertaken by a public agency which has the potential for
resulting in either a direct physical change in the environment or a reasonably
foreseeable indirect physical change in the environment, Cal. Pub. Res. Code Section
21065. Under the proposed application, no such activity is being undertaken. Even if
the application were to be considered a “project” under CEQA, which is not the case,
CEQA Guidelines Section 15308 categorically exempts actions taken by regulatory
agencies that assure the maintenance, restoration, enhancement, or protection of the
environment. Here, the request for authorization to submit an application to the Arbor
Day Foundation will have no impact on the environment whatsoever; and
B. Approve and authorize the Public Works Department to submit an application to the
Arbor Day Foundation for Vernon to be Certified a Tree City USA for 2020.
1. Arbor Day Foundation Tree City 2020 Application
8. City Administration
Fiscal Year (FY) 2020/2021 Docket I Grants Awarded by Vernon CommUNITY Fund
Grant Committee
Recommendation:
Receive and file the report, as it is being provided for informational purposes only,
pursuant to Section 2.167(e) of the Vernon Municipal Code.
9. City Administration
Report on Services Agreement with Engineering Partners, Inc. Consultant Engineers
for the Re-Design and Preparation of Plans for the Atlantic Bridge Widening Project
Recommendation:
Receive and file the report, as it is being provided for informational purposes only
pursuant to Section 2.17.12(B)(3) of the Vernon Municipal Code.
Regular City Council Meeting Agenda
December 15, 2020
Page 4 of 5
NEW BUSINESS
10. Public Works
Americans with Disabilities (ADA), Title II, Self -Evaluation and Transition Plan
Recommendation:
Adopt Resolution No. 2020-43 adopting the 2020 City of Vernon Americans with
Disabilities (ADA) Act, Title II, Self-Evaluation and Transition Plan.
1. Resolution 2020-43
2. City of Vernon ADA Self -Evaluation Report
3. City of Vernon ADA Transition Plan
4. ADA Presentation to City Council
ORAL REPORTS
City Administrator Reports on Activities and other Announcements.
City Council Reports on Activities (including AB1234), Announcements, or Directives to Staff.
CLOSED SESSION
11. PUBLIC EMPLOYEE EVALUATION
Government Code Section 54957(b)(1)
Position: City Administrator
CLOSED SESSION REPORT
ADJOURNMENT
I hereby certify under penalty of perjury under the laws of the State of California, that the foregoing
agenda was posted on the bulletin board at the main entrance of the City of Vernon City Hall,
located at 4305 Santa Fe Avenue, Vernon, California, and on the City’s website, not less than 72
hours prior to the meeting set forth on this agenda.
Dated this 10th day of December, 2020.
By: __________________________________
Sandra Dolson, Administrative Secretary
Regular City Council Meeting Agenda
December 15, 2020
Page 5 of 5
Guide to City Council Proceedings
Meetings of the City Council are held the first and third Tuesday of each month at 9:00 a.m. and
are conducted in accordance with Rosenberg's Rules of Order (Vernon Municipal Code Section
2.1-1).
Copies of all agenda items and back-up materials are available for review in the City Clerk
Department, Vernon City Hall, 4305 Santa Fe Avenue, Vernon, California, and are available for
public inspection during regular business hours, Monday through Thursday, 7:00 a.m. to 5:30 p.m.
Agenda reports may be reviewed on the City's website at www.cityofvernon.org or copies may be
purchased for $0.10 per page.
Disability-related services are available to enable persons with a disability to participate in this
meeting, consistent with the Americans with Disabilities Act (ADA). In compliance with ADA, if you
need special assistance, please contact the City Clerk department at CityClerk@ci.vernon.ca.us
or (323) 583-8811 at least 48 hours prior to the meeting to assure arrangements can be made.
The Public Comment portion of the agenda is for members of the public to present items, which
are not listed on the agenda but are within the subject matter jurisdiction of the City Council. The
City Council cannot take action on any item that is not on the agenda but matters raised under
Public Comment may be referred to staff or scheduled on a future agenda. Comments are limited
to three minutes per speaker unless a different time limit is announced. Speaker slips are available
at the entrance to the Council Chamber.
Public Hearings are legally noticed hearings. For hearings involving zoning matters, the applicant
and appellant will be given 15 minutes to present their position to the City Council. Time may be
set aside for rebuttal. All other testimony shall follow the rules as set for under Public Comment. If
you challenge any City action in court, you may be limited to raising only those issues you or
someone else raised during the public hearing, or in written correspondence delivered to the City
Clerk at or prior to the public hearing.
Consent Calendar items may be approved by a single motion. If a Council Member or the public
wishes to discuss an item, it may be removed from the calendar for individual consideration.
Council Members may indicate a negative or abstaining vote on any individual item by so declaring
prior to the vote on the motion to adopt the Consent Calendar. Items excluded from the Consent
Calendar will be taken up following action on the Consent Calendar. P ublic speakers shall follow
the guidelines as set forth under Public Comment.
New Business items are matters appearing before the Council for the first time for formal action.
Those wishing to address the Council on New Business items shall follow the guidelines for Public
Comment.
Closed Session allows the Council to discuss specific matters pursuant to the Brown Act,
Government Code Section 54956.9. Based on the advice of the City Attorney, discussion of these
matters in open session would prejudice the position of the City. Following Closed Session, the
City Attorney will provide an oral report on any reportable matters discussed and actions taken. At
the conclusion of Closed Session, the Council may continue any item listed on the Closed Session
agenda to the Open Session agenda for discussion or to take formal action as it deems
appropriate.
City Council Agenda Item Report
Agenda Item No. COV-397-2020
Submitted by: Sandra Dolson
Submitting Department: City Clerk
Meeting Date: December 15, 2020
SUBJECT
Approval of Minutes
Recommendation:
Approve the December 1, 2020 Regular City Council meeting minutes.
Background:
Staff has prepared and hereby submits the minutes for approval.
Fiscal Impact:
There is no fiscal impact associated with this report.
Attachments:
1. 20201201 City Council Minutes
MINUTES
VERNON CITY COUNCIL
REGULAR MEETING
TUESDAY, DECEMBER 1, 2020
COUNCIL CHAMBER, 4305 SANTA FE AVENUE
CALL TO ORDER
Mayor Lopez called the meeting to order at 9:01 a.m.
FLAG SALUTE
Mayor Lopez led the Flag Salute.
ROLL CALL
PRESENT:Leticia Lopez, Mayor (via remote access)
Melissa Ybarra, Mayor Pro Tem (via remote access)
William Davis, Council Member (via remote access)
Carol Menke, Council Member (via remote access)
Diana Gonzales, Council Member (via remote access)
STAFF PRESENT:
Carlos Fandino, City Administrator (via remote access)
Arnold Alvarez-Glasman, Interim City Attorney (via remote access)
Lisa Pope, City Clerk
Scott Williams, Finance Director (via remote access)
Abraham Alemu, Public Utilities General Manager (via remote access)
Fredrick Agyin, Health and Environmental Control Director (via remote access)
Michael Earl, Human Resources Director (via remote access)
Anthony Miranda, Police Chief (via remote access)
Dan Wall, Public Works Director (via remote access)
Mike Shehata, Senior Information Technology Analyst
APPROVAL OF THE AGENDA
MOTION
Mayor Pro Tem Ybarra moved and Mayor Lopezseconded a motion to approve the agenda.
The question was called and the motion carried unanimously.
PUBLIC COMMENT
None.
Regular City Council Meeting Minutes Page 2 of 5
December 1, 2020
PRESENTATIONS
1.California Highway Patrol (CHP) “10851” Grand Theft Auto Recovery Award
Recommendation: This is a presentation only. No action required by City Council.
Police Chief Miranda and Lt. March Santiago acknowledged Officer Patrick Cam for
receiving the California Highway Patrol (CHP) “10851” Grand Theft Auto Recovery
Award.
2.Increased Use of Ground Water
Recommendation: This is a presentation only. No action is required by City Council.
Assistant General Manager Todd Dusenberry provided an update on the City’s use of
imported water.
In response to Council questions, Assistant General Manager Dusenberry explained the
various funding sources; water storage capacity; and use of the tank.
3.Coronavirus (COVID-19) Vaccine Clinical Trial Update from University of Southern
California (USC) Keck School of Medicine
Recommendation: This is a presentation only. No action required by City Council.
Health and Environmental Control Director Agyin and Mary Dacuma, Keck Medicine of
USC, presented an update on the clinical trial, Operation Warp Speed.
In response to Council questions, Ms. Dacuma and Health and Environmental Control
Director Agyin discussed the intent for 350 participants; media relations; and different
methods of vaccines.
CONSENT CALENDAR
MOTION
Mayor Pro Tem Ybarra moved and Council Member Gonzales seconded a motion to
approve the Consent Calendar. The question was called and the motion carried
unanimously.
The Consent Calendar consisted of the following items:
4.Approval of the Minutes
Recommendation: Approve the November 17, 2020 Regular City Council meeting
minutes.
5.Claims Against the City
Recommendation: Receive and file the claims submitted by Vernon Tire Inc., dba
Commercial Tire Company, in the amount of $18,000; and Jason Felix, in the amount of
$900.
Regular City Council Meeting Minutes Page 3 of 5
December 1, 2020
6.Operating Account Warrant Register
Recommendation: Approve Operating Account Warrant Register No. 57, for the period of
November 1 through November 14, 2020, which totals $4,931,288.20 and consists of
ratification of electronic payments totaling $4,714,541.49 and ratification of the issuance
of early checks totaling $216,746.71.
7.Public Works Department Monthly Report
Recommendation: Receive and file the October 2020 Building Report.
8.Sale of Surplus Vernon Fire Apparatus and Equipment to Local Municipalities
Recommendation: A. Approve and authorize the City Administrator to execute the
Purchase and Sale Agreement with the City of Compton, in substantially the same form as
submitted, for the sale of: 1. One (1) 2002 Seagrave Engine with assigned hose complement
and equipment; 2. One (1) 1998 Spartan/LTI Truck 7576; and B. Approve and authorize
the City Administrator to execute the Purchase and Sale Agreement with the City of
Montebello, in substantially the same form as submitted, for the sale of: 1. One (1) 2009
Seagrave Engine 7576; 2. One (1) 2009 Seagrave Engine 779; 3. One (1) 2017 Hurst E-
Draulic Cutter, spreader, ram, batteries, battery charger, chains, tips, and accessories; and
4. One (1) 2014 Hurst Quad Power Unit, cutter, spreader, ram, hoses w/quick couplers,
chains, tips and accessories.
9.Donation of Surplus Vernon Fire Apparatus to Local Fire Academies
Recommendation: A. Approve and authorize the City Administrator to execute the Deed
of Gift and Donation Agreement and Release with Rio Hondo Fire Academy, in
substantially the same form as submitted, for the donation of one (1) 2002 Seagrave Engine
with assigned hose complement and equipment; and B. Approve and authorize the City
Administrator to execute the Deed of Gift and Donation Agreement and Release with
Verdugo Fire Academy/Glendale Community College, in substantially the same form as
submitted, for the donation of one (1) 1998 Seagrave Engine with assigned hose
complement and equipment.
NEW BUSINESS
10.Amendments to the Classification and Compensation Plan
Recommendation: A. Approve new job descriptions for the positions of Code Enforcement
Officer and Utilities Program Analyst; and B. Adopt Resolution No. 2020-42 amending
Exhibit C of the Classification and Compensation Plan, adopted by Resolution No. 2020-
19 and as amended by Resolution Nos. 2020-28, 2020-29, and 2020-32 to add new
classifications and associated salary ranges.
Human Resources Director Earl presented the staff report.
MOTION
Council Member Menke moved and Mayor Pro Tem Ybarra seconded a motion to: A.
Approve new job descriptions for the positions of Code Enforcement Officer and Utilities
Program Analyst; and B. Adopt Resolution No. 2020-42 amending Exhibit C of the
Classification and Compensation Plan, adopted by Resolution No. 2020-19 and as
amended by Resolution Nos. 2020-28, 2020-29, and 2020-32 to add new classifications
and associated salary ranges. The question was called and the motion carried unanimously.
Regular City Council Meeting Minutes Page 4 of 5
December 1, 2020
11.Software as a Service Agreement with Tyler Technologies for a Citywide Enterprise
Resource Planning (ERP) Software System, Hosting, Implementation, and Support
(Continued from November 17, 2020)
Recommendation: Approve the Software as a Service Agreement with Tyler Technologies,
Inc., in substantially the same form as submitted, for the purpose of an upgrade from the
current Tyler ERP system (Eden) to a comprehensive ERP software system, which would
include modules for Munis, EnerGov, Digital Health Department (DHD), and the Munis
Utility Billing Customer Information System (CIS), with funds reserved for a project
management consultant in an amount not-to-exceed $3,439,726 for a three (3) year term.
Finance Director Williams presented the staff report.
In response to Council questions, Finance Director Williams explained the selection of
Tyler Technologies, the RFP process, end of life of current system, and online payments.
Senior Information Technology Analyst Shehata explained the security systems used by
Tyler Technologies. City Clerk Pope provided an update on the City’s website upgrade.
MOTION
Mayor Por Tem Ybarra moved and Council Member Gonzales seconded a motion to
approve the Software as a Service Agreement with Tyler Technologies, Inc., in
substantially the same form as submitted, for the purpose of an upgrade from the current
Tyler ERP system (Eden) to a comprehensive ERP software system, which would include
modules for Munis, EnerGov, Digital Health Department (DHD), and the Munis Utility
Billing Customer Information System (CIS), with funds reserved for a project management
consultant in an amount not-to-exceed $3,439,726 for a three (3) year term. The question
was called and the motion carried unanimously.
ORAL REPORTS
City Administrator Reports on Activities and other Announcements.
City Administrator Fandino provided an update on recent Police activity. Police Chief
Miranda provided an update on the holiday activities on December 16, 2020.
City Administrator Fandino reported on the Bandini Island upgrade; public utility outages;
Housing Commission meeting December 9,2020,6:00 p.m.; COVID-19; and the transition
of fire services to Los Angeles County.
City Clerk Pope andHuman Resources Director Earl stated the Book Drive and Food Drive
were ongoing.
City Council Reports on Activities (including AB1234), Announcements, or Directives to
Staff.
Council Member Menke reported on her attendance at the National League of Cities
Summit, November 18-20, 2020, at a total cost to the City of $250.
Regular City Council Meeting Minutes Page 5 of 5
December 1, 2020
RECESS
Mayor Lopez recessed the meeting to Closed Session at 10:20 a.m.
CLOSED SESSION
12.CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION
Government Code Section 54956.9(d)(1)
A. Bicent (California) Malburg LLC et al. v. City of Vernon et al.,
Los Angeles Superior Court Case No. 19STCV08859 and JAMS Reference No.
1100107175
B. City of Vernon v. Bicent (California) Malburg LLC
Los Angeles Superior Court Case No. 19STCP02411 and JAMS Reference
No.1220062657
RECONVENE
At 11:01 a.m., Mayor Lopez adjourned Closed Session and reconvened the regular
meeting.
CLOSED SESSION REPORT
Interim City Attorney Alvarez-Glasman reported that the Council, with all five members
present, met in Closed Session, discussed the items on the agenda, and took no reportable
action.
ADJOURNMENT
Mayor Lopez adjourned the meeting at 11:02 a.m.
______________________________
LETICIA LOPEZ, Mayor
ATTEST:
_____________________________________
LISA POPE, City Clerk
(seal)
City Council Agenda Item Report
Agenda Item No. COV-437-2020
Submitted by: Sandra Dolson
Submitting Department: City Clerk
Meeting Date: December 15, 2020
SUBJECT
Claims Against the City
Recommendation:
Receive and file the claim submitted by Christina Cicione on behalf of State Farm Mutual Insurance a/s/o
Leydi Y. Sanchez in the amount of $3,617.68.
Background:
On December 2, 2020, the City received the following claim:
Name of Claimant Amount Demanded
State Farm Mutual Insurance a/s/o Leydi Sanchez $3,617.68
Pursuant to Municipal Code Section 2.11-1, the above information is listed on the City Council agenda
as soon after filing of the claim with the City as practical.
Fiscal Impact:
There is no fiscal impact associated with this report.
Attachments:
1. 20201203 Cicione, C. - State Farm
CLAIM FOR DAMAGES
TO PERSON OR PROPERTY
INSTRUCTIONS
1 . Claims for death, injury to person or to personal property must be filed not later
than six (6) months after the occurrence. (Gov. Code Sec. 91 12)2. Claims for damages to realproperty must be filed not later than one (1) year
after the occurrence. (Gov. Code Sec.911.2)3. Read entire claim before flling.4 See page 2 for diagram upon which to locate place of accident
5 This claim form must be signed on page 2 at bottom.
6. Attach separate sheets, iI necessary, to give Iull details. SIGN EACH SHEET7. Claim must be filed with City Clerk. (Gov.Code Sec. 915a)
RESERVE FOR FILING STAMP
cLArM No. [J]UIIII_f,LERl(',5 0FFICE
RECEIUES
IlEf,3'20 PE2:32ttE
TO: CITY OF VERNON CITY COUNCIL
e of Claimant
State Farm Mutual lnsurance a/s/o Leydi Y Sanchez N/A
eo man n person
Home rCSS Claimant an tate me e ep one UM
PO BOX 106172 Atlanta, GA 30348 877-787-8276
Business Address of Claimant
same as above
City and State usiness Telephone Number
Give address to which you desire notices or communications to be sent regarding this claim
Benson Legal APC
8550 Balboa Blvd, Suite 290, Northridge, CA 91325
How did OAMAGE or INJURY occur? Give full particulars.
Vernon City worker allowed manhole cover to roll into our insured's vehicle, causing property
damage. Vehicle was a 2018 HONDA CR-V with Calilornia license plate
When did DAMAGE or INJURY occur? Give full particulars, date, time of day, etc.
0610312020 at 6:00 PM
Where did DAMAGE or INJURY occur? Describe fully, and locateon diagram on reverse side ofthis sheet, where
approximate, give street names and address and measurements from landmarks
3017 Bandini Blvd, Vernon, CA
What particularACT oTOMISSION doyouclaim causedthe injury ordamage? Givenamesof Cityemployees,
causingthe injury or damage, if known:
Failure to maintain manhole cover so as not to cause damage to the property of another
What DAMAGE or INJURIES do you claim resulted? Give full extent of injuries or damages claim ed
property damage to deck lid/trunk, door, fender, quarter panel and rear bumper
What AMOUNTdo you claim of each item of injury ordamage as of date of presentation of thisclaim, giving basis of
computation:
$3,617.68 ($2,861 .84 repair cost + $255.84 rental + $500 deductible)
Give ESTIMATED AMOUNT as faras known you claim on account of each item of prospective injury or damage, giving
basisof computation:
$3,617.68 ($2,861 .84 repair cost + $255.84 rental + $500 deductible)
if any,
ere you insured at the time of the incidenl? lf so, provide name of insurance company, policy numbers anO arnount of insurance
payments received:
N/A - claimant is an insurance company. State Farm lnsurance Company, PO BOX 106172,
Atlanta, GA 30348
Expenditures made on accounl of accident or lnjury: (Date - ltem)
N/A
(Amount)
Name and address of Witnesses, Doctors and Hospitals
NiA
READCAREFULLY
For allaccident claims place on following diagram names of streets, including North, East. South, and West: indicate place
of accident by "X" and by showing house numbers or distances to street @mers.
lf City Vehicle was lnvolved, designate by letter"A" location of City vehicle when you flrsl saw it,and by "B" location of yourself
or your vehicle when you first saw City vehicle; location of City vehicle at time of accident by'A-1"and location of yourself or your
vehicle at the time of accident by "8 1" and the point of lmpact by "X.'
NOTE:lf diagrams do not fit the situation, attach hereto a proper diagram signed by claimant.
FOR OTHERACCIDENTS
CUnBI
that the , includin a attachments is true and correct.
Date:
SIOEWALK
I declare
CURg
under enal of f u
Typed/Printed Name:
Christina Cicione, Esq.
12t1t20
NOTE:ALL CLAIMANTS MAY BE REQUESTED TO AE EXAMINEOAS TO THEIR CLAIM UNOER OATH, PRESENTATION OF A FALSE CLAIM IS A FELONY (CAL
PEN. COOE SEC,72), CLAIMS MUSTBE FILED WITH CITY CLERK (GOVCOOE SEC, S15a), STATE LAW PROVIDES THAT IFYOUARE NOT NOTIFIED OFANY
ACTION BY IHE CTTY OF THIS CLAIM WITHIN 45 OAYS OF FILING THEN THE CLAIM IS DEEMED DENIED (SEE GOV, CODE SEC. 911,6 & 912.4)
PAR AY
Claimant or person filing on his/her behalf, givingre
n
Attorney for State Farm
Sign
rel p
FOR AUTOMOBILE ACCIDENTS
7A
@,
For Customer Support refer to the
appropriate platform below:LexisN CXIS'OrderPoint
800-934-9698
Orderpoint.support@lexisnexis.com
Accurint for lnsurance
86&2774407
Accudntsupport@lexisnexis.com
Lexis.com
Law Firm &counts
800-543-6862
PAGE COUNT: 6
CLIENT: 6625
DIVISION :
ADJUSTER : A9LECLAIM: 7507P0915
TRANSACTION # : 7O4342576L
DATE : 07 ll5l2020
DATE OF LOSS : 0610312020 TIME OF LOSS : 0:0:0STREET: 3017 BANDINI BLVDCITY: VERNONCOUNTY: LOS ANGELESSTATE: CA
INVESTIGATING AGENCY :
REPORT NUMBER :
REPORT TYPE :
PARTY ], :
PARfi 2 :
PARTY 3 :
CAR : CRV
VERNON PD
cR20200873
Auto Accident
LEYDI Y SANCHEZ
i4AKE : HONDA
TAG :
YEAR:2018
DRIVER LICENSE :
ADDITIONAL INFO :
NOTE:
Police Report
THANK YOU FOR YOUR ORDERI
Worldle ID:
Partshare:
621dr3d7
SRwyzL
fueral ID:
Resale Number:
state EPA:
BAR:
9r-19.14951
SRAF 102642587
c4r000401441
4RD278920
RO Number: 6476
written By: oaniel Jimenez, 71112020 ltl6t29 ?M
Mjuster: Express Team U, (855) 34f-8184 Buslness
Insuredi
Type of Loss:
Pdnt of Impad
SANCHZ, LEYDI
Comprehensive
05 Right Rear
Policy *:
Date of L6
Oaim *:
Crays to Repair:
7m7PG91501
0
Iniur.nce @mpany:
STATE FARI4 INSURANCE COI'1PANIEs
6/3/2020 6:00 Pl4
Osm€r:
SANOIEZ, IEYDI
Inspedon Locadon:
RB PAINT & BOOY
10850 No.walk Blvd.
Sanb Fe Springs, CA 90670
Repair Facility
(562) 901-1 100 Busness
Vehlde Drop Off Date:
Repalr Completion Date:
06/m/2020
061t012020
Promlse Dat€:
Vehicle Pick Up/Retu.n
Date:
0611612020
06/10/2020
Repair Start Date:0610812020
VEHICLE
2018 HONo CR-V LX 4D UTV 4-2.41Gasoline Gasoline Direct lhjection BURGANoY
BURGANOY
vlN: 9427 Inteiorcolor:
Ucense: 127 B(Mr color:
State: C Produdirt Dab
Mileage In:
Mileage Out:
Conditon:
vehicle out: 5/1712020
lob *: 6139
IRAI{S tllsto]{
Autofl ratic Traninission
POWER
Pa {er Steerirc
Power Bl-al(es
Po{er l-ods
OEOOR
Dual Minols
TlnEd Glass
Console/Storage
OverlEad Console
OOM'E IE]ICE
Air Co.dit onirc
tntermitrert wipers
nlt Whed
clutse Control
Rear Oefogger
Keyless EnEy
Message CenEr
Steering \|,/h€el Touch Conds
Rear Wndorv Wiper
T€iescopic l^thed
Oimate contsol
Badup camera
RADIO
AM Radio
FM RdIo
Stereo
searcwSeek
A.xaliary Audb ConrEction
SAFETY
Ddvers SUe Air 8ag
PderE€r Air 8ag
AnU-Lod Brdk€s (4)
4 WtEel Disc B6kes
Tretion Control
Sbbility Conuol
Front Sde lmpact Air Bags
Head/Curtain ar Bags
Hands Free Device
SE TS
cloth Seats
Budet Seats
Redining/l-ourEe Saats
wHEEl.lS
Aluminum/Alloy wheels
PAlT
Clear @at Paint
OTHER
RearSpoiler
Estimates
71712020 r:16:29 PM 311359 Page 1
RB PAINT & BODY
REI,AX WE WILL TAKE IT FROM HERE !
10850 Norwalk Blvd., Santa Fe Springs, CA 90670
Phone: (562) 903-1100
F/U(: (562) 903-1104
Supplement of Recod 2 with Summary
Supplement of Record 2 with Summary
RO Number: 6476
2018 HOND CR-V LX 4D UTV 4-2.41Gasollne Gasoline Direct Iniectioo BURGANDY
Line Op€r Descdption Part l{umber Qtv Extended
Price 3
Labor Paint
so2
so2
,AUTTIORIZANON TO PAY
SEO,RED,
OWI{ER PROVIOED WIIH A @gY
OF
ESTIMAIE / RNAL BILL
Four wheel alignmenl
O/H rear bumper
Bumper cover
RT Sire cover
Add fo. Oear Co.t
Lo,ver aover w/viible odEust
RT slde rcbirEr
2*1
3
5
6
1
8
9
r0
l1
12
14
15
16
17
18
19
20
21
22
23
24
# s02
# s01
REAR BUT,TPER
Subl 85.00 x
s
85.00
60.38
2.0
0.4
0.5
1.0
0.2
2.4
1.0
Repl
Repl
71501LA400
o4TI2IL,a,00ZZ
u5l5
20116
71510T14400
71593T1AA01
r05.59
14.88
2.4
Incl.
Ind.
Ind.
0.1
Repl
Repl
REAR LAI.,IPS
R&l
REAR BODY & FLOOR
' Rpr
REAR SUSPEI{SIOTI
S01 Repl
S01 Repl
QUARTER. PAI{EL
* subl
t RPr
RT Tail lamp assy
RT Rail rernl rear (UHS)
20.00
0.3
0.3
0.2
0.4
L0
RT Hub assy
RT Kn*kle
42200Tt8A51
52210r4A02
155.30 m
164.20 m
Ind.
2.1 M
Four whed alignment
RT Tail lamp po*et
Add for Oea. coat
RT Qrra.ter panel d1f wheeb
Add lor Oear @at
RT Wr€elhouse liner dlf
wheeb
RT Wheel opng mldg
RT Protector l|/o Indiana built
RT Quarter glass Hoida w/o
p.l'v<y
RT Inner gltEelhouse
Orerlap Mino. Panel
G|-ASS r(IT*
ROOF
R&t
EXHAUST SYSTEH
r Rpr
tr subl
# RePl
# Repl
Mumer & pipe w/o AWD
+r.r.ADD-ONS.r*rr
Hazardorrs waste removal
Cover ca.
R6tore @rosion Potectbn
Primer
Rpr
Repl
Repl
Repl
subl
Rpr
1
L0
8,0
0.3
26
27
28
74413TLA401
744l2TMETo1
74552TLA400
19.33
21.00
20.00 x
29
30
3l
32
33
34
35
36
37
38
39
_r.0
.l.o
0.1
{.2
1
RT onp molding
I
1
1
1
5.00
6.00
15.00
7 l7 12020 li76:Zg Pl4 311359 Pag€ 2
1
I
I
I
1
1
1
Supplement of Record 2 with Summary
RO Number: 6476
2018 HONo CR-V l-X 4D UTV 4-2.41 Gasoline Gasoljne Dired lnjectjon BURGANDY
40
4l
42
43
45
RepL Fex additive
bnt coloa
pre scan
dip feider
RR R€0ector
Trunk fl@k
1
1
I
I
1
I
8.00
0.5
0.5 1"1
501
501
s01
24.56
77.95
2.35
46
47
OIHER GIARGES
To ing 375.00
SUBTOTALS r,636.35 22.1 7.6
Crtegory Basis Rate cost s
Parts
Parts Dscount
Body tabot
Paint lrbo.
MedEnkal Labor
Paint grpplies
Misaellaneols
Other Orarues
-5.0 %
$ 44.00 /tY
t .14.00 /hr
J 53.00 /h.
t 34.00 /hr
1,176.35
-29.33
858.00
334.40
163.80
258.40
85.00
375.00
$ 586.54
19.5 h6 @
7.6 hrs @
2.6 hrs @
7.6 h6 @
subtotal
Sales Tax $ 1,33s.42 @ 10.5m0 %
Grand Total
Ded!cbble
CUSTOI.TER PAY
INSURANCE PAY
Register online to dECk the sabrs of yoor daim and #y conneced wth sEte Fam@. To regi*er, go to htbr/www.statefarm.com/
and select ClEck Ule Status of a Oaim. lf you are alreidy regi$ered. thank yotl!
3,227.62
740.22
3,351.44
500.00
500.00
2,a61.84
71712020 r'.r6t29 PM 111359 Page 3
ESTIMATE TOTALS
Supplement of Record 2 with Summary
R.O umb€r: ff76
2018 HOND CR-v tx 4D Ury 4-2,41Gasoline Gaoline Direct Iniedion BURGANDY
SUPPLEMENT SUMMARY
Line Op€r Labor PaintDescriptionPart umb€r aW Extend€d
Price
*
*
2
3
s02
s02
s02
.AUT}ORIZAIION TO PAY
SEq,lRED,
OWNER PROVIDED WITH A @PY
OF
ESTIMAIE / FIML BITI
suaToTALs o.00 o.0 0.o
TOTALS SUMMARY
cat€gory Basis Rate cost $
Paats 0.00
Subtotal 0.00
CUMULATIVE EFFECTS OF SUPPLEMENT(S)
ECimaE
Supplement g)1
Supdern€nt S02
2,846.00
515.84
0.00
O6nal Jimenez
Daniel Jimen€z
Danrel larnenez
JobTotal:
CUSTOI,IER PAY:
IHSURAT{CE PAY:
3,361.84
s00.00
2,861.84
t
t
$
7 l7 12020 tt16:29 Pt4 311359 Page 4
Added Items
I
1
1
Supplement of Record 2 with Summary
RO Number: 6476
2018 HOND CR-V Lx 4D UTV 4-2.41Gasoline Gasolane Direct Inje.tion BURGANDY
FOR YOUR PROTECnON CAUFORNIA LAW REQUIRES THE FOLLOWING TO APPEAR ON THIS FORM: ANY PERSON
WHO KNOWINGLY PRESENTS FALSE OR FRAUDULENT CLAIM FOR THE PAYN4ENT OF A LOSS IS GUILW OF A CRIME
AND MAY BE SUB]ECT TO FINES AND CONFINEI'4ENT IN STATE PRISON.
THE FOLLOWING IS A UST OF ABBREVIANONS OR SYMBOLS THAT MAY BE USED TO DESCRIBE WORK TO BE
DONE OR PARTS TO BE REPAIRED OR REPLACED:
MOTOR ABBREVIATIONS/SYNIBOLS: D=DISCONTINUED PART, A=APPROXMATE PRICE. LABOR TYPES: B=BODY
LABOR, D=DIAGNOfiC, E=ELECTRICAL, F=FRAME, G=GLASS, M=MECHANICAL, P=PAINT I-ABOR,
S=STRUCTURAL, T=TAXED MISCELLANEOUS, X=NON TAXED MISCELLANEOUS. CCC ONE: ADJ=ADJACENT,
ALGN=AUGN, Iy'M=AFTERMARKET, BLND=BLEND, CAPA=CERTIFIED AUTOMOTIVE PARTS ASSOCIATION,
D&R=DISCONNECT AND RECONNECT, EST=ESTIIIATE, EXT, PRICE=UNIT PRICE MULTIPUED BY THE QUANITY,
INCL=INCLUDED, MISC=MISCELLANEOUS, NAGS=NATIONAL AUTO GLASS SPECIFICATIONS, NON-ADJ=NON
ADJACENT, O/H=OVERHAU! OP=OPERATION, NO=UNE NUMBER, QTY=QUANITI'/, RECOND=RECONDITION,
REFN=REFINISH, REPL=REPLACET R&I=REMOVE AND INSTALL, R&R=REI'IOVE AND REPLACE, RPR=REPAIRI
RT=RIGHTI SECT=SECTION' SUBL=SUBLET, LT=LEFT, WO=WITHOUT, W_=WTTH/_ SYMBOLS: #=NIANUAL LINE
ENTRY, *=OTHER IIE..I4OTORs DATABASE INFORMATION WAS CHANGED], *I'=DATABASE LINE WITH
AFTERMARKET, N=NOTES ATTACHED TO UNE. OPT OEIVI=ORIGINAL EQUIPMENT MANUFACTURER PARTS EITHER
OPNONALLY SOURCED OR OTHERWISE PROVIDED WITH SOME UNIQUE PRICING OR DISCOUNT.
,CURE TIME' MEANS THE LENGTH OF TIME THAT, PER THE ADHESIVE MANUFACTURER, THE WNDSHIELD
ADHESIVE NEEDS TO CURE UNTIL THE WINDSHIELD CAN PROPERLY FUNCTION A5 A SAFETY DEVICE PURSUANT
TO THE FEDERAL MOTOR VEHICLE SAFETY STANDARDS AND THE VEHICLE MANUFACTURERS SPECIFICATIONS'
717/2020 1176t29 PM 311359 Page 5
Supplement of Record 2 with Summary
RO Number: 6475
20rg HOND CR-v t)( 4D UTV +2.41Gasollne Gasoline oired Inie<tion BURGANDY
Estmate based on MOTOR CRASH ESTIMATING GUIDE and potentially other third party sources of data. Unless
otherwise noted, (a) all items are d€rived fmm the Guide ARG4464, CCC Data Date 0201/2020, and potentially other
$ird party sources of data; and (b) the parb presented are OEM-parts. OEM parG are manufachrred by or for the
vehicle's Original Equipment Manufacturer (OEM) according !o OEM'S specifications for U.S. distribuuon. OEM parts
are available at Oryehicle dealeEhips or the specified supplier. OPf OEM (Optional OEM) or ALT OEM (Alternative
oEM) parts are oEM parts that may be provided by or though alternate sources od|er than the oEM vehicle
dealeEhips with discounted pricing. Asterisk (*) or Double Asterisk (**) indicates that the parts and/or labor data
provided by third party sources of data may have been modified or may have come from an alternate data source.
Tilde sign (-) items indicate MoToR Not-Included Labor operations. The symbol (<>) indicates the refinish
opection WILL NOT be performed as a separdte procedure from the other panels in the estimate. Non-Original
Equipment Manufacturer aftermarket parts are described as Non OEM, A/M or NAGS. used parts are described as
LKe, RCy, or USED. Reconditioned parts are described as Recond. Recored parts are described as Recore. NAGS
part Numbers and Benchmark Prices are provided by Nauonal Auto Glass Sp€cifications. Labor operauon times listed
on the line with the NAGS information are MOTOR suggested labor operation times. NAGS labor operauon times are
not included. Pound sign (#) items indicate manualentries.
Some 2021 vehicles contain minor changes from the previous year. For those vehicles, prior to receiving updated
data from the vehicle manufacturer, labor and parts data from the previous year may be used. The ccc oNE
estimator has a list of applicable vehicles. Parts numbers and prices should be confirmed with the local dealeBhip.
The folloy/ing is a list of additional abbreviations or symbols that may be used to describe work to be done or parts to
be repaired or replaced:
SYMBOE FOLLOWING PART PRICE:
m=MOTOR Mechanical component. S=MOTOR Structural component. T=Ntiscellaneous Taxed charge category.
x=Miscellaneous Non-Taxed charge category.
SYT4BO6 FOLLOWING LABOR:
D=Diagnostic labor category. E=Electrical labor category. F=Frame labor category. G=Glass labor category.
M=Mechanical labor category. S=Structural tabor category. (numbers) 1 through 4= Ljser Defined Labor Categories.
OTHER SYMBOLS AND ABBREVIATIONS:
Adj.=Adjacent. Algn.=Align. ALU=Aluminum. A/M=Aftermarket part. Blnd=Blend. BoR=Boron steel'
Clil=Certified eutomotive parts Association. D&R=oisconnect and Reconnect. Hss=High strength Steel.
HYD=Hydroformed steel. Incl.=Included. LKQ=Like Kind and Quality. LT=left. MAG=Magnesium. Non-Adj'=Non
nO.pceni. NSf=nSf tntemational Certified Part. O/H=Overhaul. Qty=Quantity. Refn=Refinish. Repl=Replace.
R&I=Remove and Install. R&R=Remove and Replace. Rpr=Repair. RT=Right. sAs=sandwiched steel.
sect=section. subl=sublet. uHs=ultra High Strength steel. N=Note(s) associated v{ith the estimate line.
CCC ONE Estimating - A product of CCC Information Services Inc'
The following is a list of abbreviations that may be used in ccc oNE Estimating that are not part of the MoToR
CRASH ESTIMATING GUIDE:
BAR=Bureau of Automotive Repair. EPA=Environmental Protection Agency. NHTSA= National Highway
Transportation and safery Administration. PoR=Paintless Dent Repair. vIN=vehicle Identification Number'
7 17 IZO2O ltr6t29 PM 311359 Page 6
RB PAINT & BODY
RELAX WE WILL TAKE 1T FROM HERE !
10850 Norwalk Blvd., Santa Fe Sprinqs, CA 90670
Phone: (562) 903-1100
F/{(: (562) 903-U04
supplement of Record I with Summary
F€der3llD:
Resale Number:
State EPA:
&lR:
621d13d7
5Rwfzl
91-1944951
sRAP-102642587
cA1000401441
ARD278920
Workfile lD
Partsshare
RO Number; 6476
written By: Daniellimenez, 6/172020 2:51:36 th':
Adjuster: Express Telm U, (855) 141-8184 Business
Insured: SANCHEZ, tf/Dl
Type of toss: comprehensive
Point of lmpa.t 05 Right Rear
Policy #:
oate of toss
Chim #i
Days to Repair:
75-07P0-91S01
0
Insurance @mpany:
SIATE FARM INSUMNCE COMPANIES
6/3/2020 6:00 Pl4
Ownel:
SANCflZ. ISYDI
Inspection Locaton:
RB PAINT & EODY
10850 No alk Btud.
S,anta Fe Springt Cl 90670
Repair Facility
(562) 903-l 100 Business
vehide Drop otf Date: 06/08/2020 Promise Date:0611612020 Repair Start oate:o6/08/2020
VEHICLE
2018 HONO CR-V LX 4D UTV 4-2.41 Gasoline Gasoline Direct Injedjon BURGANDY
VIN:
License
state:
427 lnteriorColor:
27 Exterior Color:
OA Prcducton Date:
l4ileage ln:
Iqileage Out:
Condition:
vehrcle out: 6/16/2020
lob *: 5139
BURGANDY
TRAi{Sl.rrsslo
Automatic Transmission
POWER
Power Steering
Power Brakes
DECOR
Dual Mirrors
Tinted 6lass
Console/Storage
Ovehead Console
cot{vEirrEr{cE
Air Cohdiuoning
Intermrttent Wipers
Tllt Wheel
Cruise ConBol
Rear Defogger
Ke"yless Entry
Message Center
steenm Wheel Touch controls
Rear Window Wiper
Tdescop,c wheel
Climate Control
Backup camera
RADIO
Ar1 Radio
Flrl Radio
Stereo
5€arch/Seek
Aoiliary Audio Connection
SATETY
Drivers Side Air 8ag
Passenge. Air Bag
AnU-Lock Brakes (4)
4 wheel Disc BEkes
TEtron Control
Stability contsol
Front Side Impact Air Bags
Head/Curtain Air Ba95
Hands Free Deviae
SEATS
Cloth Seats
Eucket SeaE
ReclinirE/Lounge Seats
WHEEl.s
Aluminum/Alloy Wh€els
PAIt T
Clear Coat Paint
OTHER
Rear Spoiler
6/1712020 2r51r36 PM 311359 Page I
Supplement of Record 1 with Summary
RO umber:6476
2018 HOND CR-V tX 4D UTV 4-2.41Gasotine Gasotine Direct Injedjon zuRGANDy
Line Oper Description Part l{umber Qtv
Price i
Labor Paint
L*g)1 Subl Four wheel alignment 85.00 x
1
I
2
3
5
6
7
I
REAR AUMPER
Repl
Repl
O/H rear bumper
Bumper cover
RT Side cover
Md for Clear Coat
lower cover w/vigble exhaust
RT Side retairEr
71501T14400
M772ILAAWZZ
17515
20116
2.4
Incl.
Incl.
71510T14400
71593I4A01
105.s9
14.88
2.0
0.4
Repl
Repl
Inci.
0.1
9
10
REAR I.A}TPS
R&I RTTail lamp assy 0.3
11
t2
REAR BODY & FLOOR
Rpr RT Rail reinf rear (UHS)!s 0.5
1l
t4
15
REAR SUSPE]{SIOII
SOI Repl RT Hub assy
$1 Repl RT Knuckle
422mrBA51
52210TI-AA02
156.30 m
164.20 m
Incl.
2.1 M
I
1
16
t7
18
19
20
2l
22
23
24
25
26
27
28
QUARTER PANEL
# subt* Rpr
Four wheel alignment
RT Tail lamp pocket
Add for Clea. Coat
RTQuarter panel V17' wheels
Add for clear Coat
RT Wheelhouse liner V17"
RT Wheel opng mldg
RT Protector Vo Indiana built
RT Quarter glass Honda w/o
RT Inner wheelhouse
Overlap Minor Panel
GLASS KJT
74413Tt4A01
744t2TMETo1
19.33
2r,00
20.00 x
85.00
60.38
20.00
1.0
o.2
1.0
Rpr
Repl
Repl
Repl
Subl
Rpr al
!.!
0.3
0.3
0.2
L0
1
1
I
74552TLAA00
-0.2
1
29
30
ROOF
R&l RT orip molding 0.4
3l
32
33
34
35
36
37
38
39
40
EXHAUST SYSTEI,I
* Rpr
# Subl
# Repl
# Repl
Muffler & pipe Vo AWD
Hazardous waste removal
Cover Car
Restore Conosion Protection
Primer
tint color
pre Scan
clip fender
1n
I
1
1
1
1
1
1
I
Repl
5.00
6.00
16.00
s01
8.00
0.5
0.5 t4
6177ln21 2:57136 Pl4 311359
24.56
Page 2
1
s
Supplement of Record I with Summary
RO Number: 6476
2018 HON0 CR-V LX 4D UTV 4-2.41Gasoline G.soline orrect lnjection EURGANDY
41,
42
s01
s01
RR Reflector
Trunk Hook
OTHER C}IARCES
Towinq
1
1
t7.95
2.35
43
1 375.00
SUBTOTALS 1,635,35 22.1 7.6
ESTIMATE TOTALS
c.tegory Rate Cost $
Parts
Parts Discount
Body tabor
Paint Labor
I,lechanical Labor
flaint Supplie,s
Misceilaneous
Other Charges
-5.0 %
I 44.00 /hr
I ,H.00 /hr
i 63.00 /hr
3 34.00 /hr
$ 586.54
19.5 hrs @
7.6 hls @
2.6 hrs @
7.6 h6 @
1,176.3s
-29.33
858.00
334.40
163.80
258.40
85.00
375.00
SubtoEl
Sales Tax 11,335.42 @ r0.5m0 %
Grand Total
Dedudible
CUSTOHER PAY
INSURANCE PAY
Register ontine to ch€ck O€ sbtus of your claim and stay conrlecH with State Fann@. To register, 90 to httpJ/wvYw.sGtefarm.com/
and selett Check he stabis of a Claim. If you are already registered, thank you!
3,22t.62
t40_22
3,361.84
500.00
500.00
2,46L,44
6lt7l2o20 2:Stt36 PM 111359 Page 3
Basis
Supplement of Record I with Summary
RO Number: 5476
2018 HoND cR-V Lx 4D UTV 4-2.41Gasoline Gasoline Direct Injection BURGANDY
SUPPLEMENT SUMMARY
Line Op€r Lahr PaintDescriptionPart l{umb€r aty Extended
36#
Price
Subl Foor wheel alignrEnt I {5.00 X
NOTEi RIGHT REAR WHEEL IS rINCH OFF FROM WHEEL HOUSE. wItI SEND TO AUGNMENT TO CONFRIM
DAMAGB l€ VISABTI S{ISPE{SIOI{ DAI'IAGE
I
l3
14
15
40
4L
# S01 Subl
RE R SUSPEI'SIOII
S,01 Repl
$1 RePl
# 501
# sol
# sol
RT Hub assy
RT Knuckle
dip fender
RR Refrector
Trunk Hook
Four wheel alignment 85.00 x
42200T[AA5l
52210TtAA02
156.30 m
164.20 m
24.56
17.95
2.35
I.d.
2.1 M
I
1
8
I
I
SUATOTALS 365.36 2,L 0.0
TOTALS SUMMARY
Cat€gory 83sis Rate cost $
Partt
Parts oiscount
Mechanical Labor
I 365.36
2.1 hrs @
-5.0 95
t 63.00 /hr
365.36
-18.27
132.10
Sublotal 479.39
Sales Tax
Addlboml Supple.nent Tarcs
t 347.09 @ 10.5m0 %36.44
0.01
Total supplement lrnount 51s.84
'{ET
COST OF SUPPLEHEI{T 515,84
CUMULATIVE EFFECTS OF SUPPLEME'{T(S)
Estimate
SupplerErt S01
2.846.00 Daniellii€nez
515.84 Daniellitnenez
,ob Total:
CUSTO ER PAY:
I'{SURANCE PAY:
3,361.84
500.00
2,861,84
$
I
t
6/17/2020 2:51r36 m{311359 Page 4
Oeleted Items
Added ltems
Supplement of Record I with Summary
RO l{umber: 5476
2018 HOID CR-v u 4D UTV +2.41Gasoline Geline Dne.t Inie(tion BT RGANDY
FOR YOUR PROTECNON CAUFORNIA LAW REQUIRES THE FOLLOWNG TO APPEAR ON THIS FORM: ANY PERSON
WHO KNOWINGLY PRESENTS FALSE OR FRAUDULENT CLAIM FOR THE PAYMEI.JT OF A LOSS IS GUILTY OF A CRIME
AND MAY BE SUB]ECT TO FINES ANO CONFINEMENT IN STATE PRISON.
THE FOLLOMNG IS A UST OF ABBREVIATIONS OR SYI,4BOLS THAT [4AY BE USED TO DESCRIBE WORK TO BE
DONE OR PARTS TO BE REPAIRED OR REPI.ACED:
N1OTOR ABBREVIATIONS/SYMEOLS: D=DISCONINUED PARI A=APPROKMATE PRICE. LABOR TYPES: B=8ODY
LABOR, D=DIAGNOSTIC, E=ELECTRICAL, F=FRAI.4E, G=GLASS, M=MECHANICAL, P=PAINT LABO&
S=STRUCTURAL, T=TAXED MISCELLANEOUS, X=NON TAXED MISCELLANEOUS. CCC ONE: ADJ=AOJACENT,
ALGN=AUGN, A/M=AFIERMARKET, BLND=BLEND, CAPA=CERTIFIED AUTOMOTIVE PARTS ASSOCIATION,
D&R=DISCONNECT AND RECONNECT, EST=EfiI4ATEI Efi. PRICE=UNTT PRICE MULTIPUED BY THE QUANflTY,
INCL=INCLUDED, MISC=MISCELI,ANEOUS, NAGS=NATIONAL AUTO GLASS SPECIFICAIIONS, NON-ADJ=NON
ADJACENT, O/H=OVERHAUL, OP=OPERATION, NO=LINE NUMBE& QTY=QUANTITY, RECOND=RECONDITION,
REFN=REFINISH, REPL=REPLACE, R&I=REMOVE AND INSTAI.I, R&R=REMOVE AND REPLACE, RPR=REPAI&
RT=RIGHT, SECT=SECTION, SUBL=SUBLET, LT=LEFT, WO=WITHOUT, W-=WITH/- SYMBOLS: #=MANUAL UNE
ENTRY, *=OTHER [IE..NIOTORS DATABASE INFORI4ATION WAS CHANGED], **=DATABASE UNE WITH
AFTERMARKET, N=NOTES ATTACHED TO UNE. OPT OEM=ORIGINAL EQUIPMENT MANUFACTURER PARTS EITHER
OPTIONALLY SOURCED OR OTHERMSE PROVIOED WITH SOME UNIQUE PRIC]NG OR DISCOUNT,
.CURE TIME' I4EANS THE LENGTH OF TIME THAT, PER THE ADHESIVE MANUFACTURER, THE WINDSHIELD
ADHESIVE NEEDS TO CURE UNTIL THE WINDSHIELD CAN PROPERLY FUNCIION AS A SAFETY DEVICE PURSUANT
TO THE FEDERAL MOTOR VEHICLE SAFETY STANDAROS AND THE VEHICLE MANUFACTURER'S SPECIFICATIONS.
61t712020 2ts1t36 Pt4 311359 Page 5
Supplement of Record I with Summary
RO umber:6476
20rg HOND CR-V t)( 4D UTV 4-2.41Gasoline Gasoline oirect lniection BI,RGANDY
Estimate based on MOTOR CRASH EfiMATlNG GUIDE and potentially other third party sources of data. Unless
othenrise noted, (a) all items are derived from the Guide AR@464, CCC Data Date 06/16/2020, and potentially other
third party sources of data; and (b) the parE presented are OEM-parts. OEM parts are manufactured by or for the
vehicle's Original Equipment Manufacturer (OEM) according to OEM'5 specifications for U.S. distribution. OEM parts
are available at OE/Vehicle dealerships or the specified supplier. OPT OEM (Optional OEM) or ALT OEM (Alternative
OEM) parts are OEM parts that may be provided by or through alternate sources other than the OEM vehicle
dealeEhips with discounted pricing. Asterisk (*) or Double Asterisk (**) indicates that the parts and/or labor data
provided by third party sources of data may have been modified or may have come from an alternate data source.
Tilde siqn (-) items indicate MOTOR Not-Included Labor operations. The symbol (<>) indicates the refinish
operation WILL NOT be performed as a separate procedure ftom the other panels in the estimate. Non-Original
Equipment Manufucturer aftermarket parts are described as Non OEM, ,y'14 or NAGS. Used parts are described as
LKQ, RCY, or USED. Reconditioned parts are described as Recond. Recored parts are descrjbed as Recore. NAGS
Part Numbers and Benchmark Prices are provided by National Auto Glass Speciflcations. Labor operation times listed
on the line with the NAGS information are I4OTOR suggested labor operation times. NAGS labor operation times are
not included. Pound sign (#) items indicate manual entries.
Some 2020 vehicles contain minor changes from the previous year. For those vehicles, prior to receiving updated
data from the vehicle manufachrrer, labor and parts data from the previous year may be used. The CCC ONE
estimator has a list of applicable vehicles. Parts numbers and prices should be confirmed with the local dealechip.
The following is a list of additional abbreviations or symbols that may be used to describe work to be done or parts to
be repaired or replaced:
SYMBOLS FOLLOWING PART PRICE:
m=I'4OTOR Mechanical component. s=I'1OTOR Structural component. T=Miscellaneous Taxed charge category.
X=Miscellaneous Non-Taxed charge category.
SYMBOLS FOLLOWING LABOR:
D=Diagnostic labor category. E=Electrical labor category. F=Frame labor category. G=Glass labor category.
M=l'lechanical labor category. S=Structural labor category. (numbers) 1 through 4=User Deflned Labor Gtegories.
OTHER SYMBOLS ANO ABBREVIATIONS:
Adj.=Adjacent. Algn.=Align. ALu=Aluminum. A/I4=Aftermarket part. Blnd=Blend. BOR=Boron steel
CAPA=Certified Automotive Parts Association. D&R=Disconnect and Reconnect. HSS=High Strength Steel.
HYD=Hydroformed steel. Incl.=Included. u<Q=Uke Kind and Quality. LT=1eft. NIAc=f4agnesium. Non-Adj.=Non
Adjacent. NSF=NSF International Certjfied Part. O/H=Overhaul. qy=quantitV. Refn=Refinish. Repl=Replace.
R&J=Remove and Install. R&R=Remove and Replace. Rpr=Repair. RT=Right. SAs=sand',Yiched Steel.
Sect=Section. Subl=Sublet. UHS=Ultra High Strength Steel. N=Note(s) associated with the estimate line.
CCC ONE Enimating - A product of CCC Informauon Servic6 Inc.
The following is a list of abbreviations that may be used in CCC ONE Estimating that are not part of the |.4OTOR
CRASH ESNMATING GUIDE:
BAR=Bureau of Automotive Repair. EPA=Environmental Protection Agency. NHTSA= National Highway
Transportation and Safety Administration. PDR=Paintless Dent Repair. VIN=Vehicle Identification Number.
611112020 2)Stt36 PM 311359 Page 6
RB PAINT & BODY
RELAX WE WILL TAKE IT FROM HERE !
10850 Norwalk Blvd., Santa tu Springs, CA 90670
Phone: (562) 903-1100
FAX: (562) 903-1104
Estimate of Record
Wo*file lD:
Partsshare:
621d13d7
5RltyzL
Federal ID:
R€rale Number:
state EPA:
8AR:
91,19.44951
SRAP-102642587
cAL000401,r41
ARD278920
WriEen Byr Daniel Jimenez. 6/9/2020 1155:49 PM
Adjuster: Erpress Team U, (855) 341-8184 Busjness
Insurcd: SAI,ICHA, IEYDI
Type of Loss: Compreheflsive
Polnt of lmpad: 05 Rjght Rear
Policy #:
Date of Loss: 6/3/2020 6:00 PM
RO Number: 6476
vehid€ Drop Off Oater 061c8.12020 P.omls€ Date:
Claim r:
Days to Repairj
7H7P&91S01
0
lnsur.nce @mFany:
SIA'IE FARM INSURANCE COMPANIES
Ouncn
SAI{ctIEz, EYDI
lnsp€cdon Lo<adon!
RB PAINT & SOOY
10850 Nomalk Blvd.
Santa Fe Springt cA 9$70
Repair Faciliry
(562) 903-1100 Busjness
0611612020 Repairst rt o.te:0610812020
VEHICLE
2018 HONO CR-V l.J( 40 UTv +2.41 G.soline G.soline oir€ct Iniedioo BURGAIoY
vlN: 9427 lnterior Color:
Uc€os€: 127 Eceriorcolor: BURGANDY
Stater Cl PrDduction Oate:
Mileage Inr
Mileage Out:
coodiUonl
6ll61m20
6139
Veh cle Out
lob f
TRANSHIS$ON
Autoamtic Transmission
POWER
PorJer Steering
Power Brdles
DECOR
Dual Mirro6
Tinted Glass
Consol€y'Storaqe
Overhead Congoh
corvErtEt{cE
,rir Coriltihing
Intarmitteot Wipers
Iilt Wh€C
Ouise Contsd
Rear Defogger
Keyless EnW
Message Ct,lEr
S&rilE lt4E€l Toudr Contsoh
Telescopt Wheel
OirnaE Contsd
Backup Camera
n Dto
AM Radio
Ft'l R.dio
SEreo
Seard/S€ek
Auriliary Audio Coonection
SAFETY
Orivers Sirle Air 8ag
Peng€r,fi Bag
AnU-Lod Brak€s (4)
,t Wt|e€l Disc Brakes
Tradion Cootsol
SBbility Contol
front Side Impact Ar Bags
Head/Curtaln Ajr Bags
Hands Fr€e Device
SEATS
Oo$ Seats
Buckel Seats
Redining/Lounge SeaE
wlt;ELs
AluminunvAtloy wheels
PAlI{T
Clear Coat Paint
OTHER
Rear Spdler
5/9/2020 1:55:a9 PM 311359 Page 1
Estimate of Record
Ro Number: 6476
2018 HO10 CR-V LX 4D Uw 4-2.41Gasoline Gasoline Direc Iniedioo ELRGAi{DY
Line Op€r D€scription Part Numb€r QtY Extend€d
Pric€ t
Labor Paint
1
2
3
4
5
6
7
I
9
l0
l1
t3
l4
l5
16
77
18
22
23
24
26
27
28
29
30
31
32
33
34
35
36
REAR. BUI,IPER
REAR LAI,IPS
19
20
27
O/H rear bumper
Eumper cover
RT sid€ co\,,er
Add for Oear coat
Lovrer cov€r Vvidble exhau*
RT Side rcbir|er
Repl
Repl
7l50lTLtAoo
M7tzlt}rcoz
u6-t5
20116
lnd.
lncl.
7151oTlAAm
71593TLAA0r
105.59
14.88
lrd.
0.r
Repl
Repl
2.0
0.4
0.5
R&I RT Taillamp assy 0.3
l,o
L0
8,0
0.3
REAR BODY E FLOOR
' Rpr
QUARTER PAt{EL
* Subl
' Rpr
RT Rail reinf rear (UHS)
RT Dnp molding
74413TLAAol
744t2TMETol
74552T14400
19.33
21.00
20,.@ x
0.3
0.2
Four wheel alilnment
RT Tail lamp pocket
Add for clear coat
RT Quaner panel Vlf wheeb
Add for Oear Coat
RT wheelhouse ljner rU"
RT Wred opng mldg
RT Protector w/o Iodiana built
RT Quarter glass Honda w/o
priy&y
RT Inner wheelhous€
Ovedap Minor Panel
GLASS KIT
ROOF
R&l
EXHAUST SYSTEX
' Rpr
*
* Subl
* RePl
# Repl
Muffier & pipe Vo AWo
*.*,rADD_oNS**1**
Harardous waste rermval
@v€Y Car
tleatore Cono6ion ttotectbfl
Primet
Flex additive
Unt color
prc s@n
Four whe€l alignrEnt
Rpr
Repl
Repl
Repl
Subl
Rpr
85.00
60.38
20.00
1.0
0.2
2.4
1.0
l.a 0t
{.2
1
0.4
r.0
5.00
6.00
16.00
1
I
I
I
s
Repl
Subl
8.00
85.00 x
0.5
0.5 M
Not€: RIGHT REAR WHEEL Is llNcll OFF FROM WHEEL llOUSE. WIII SEND TO AUGNMENT TO CONFRIM
OAMAGES NO VISAELE SUSPENSION DAMAGE
OTHER C1IARGE5
Towinq
6/9/2020 r:55:49 PM 311359
375.00
Page 2
37
38
I
1
1
1
5
I
I
I
I
Estimate of Record
RO Numb€r: 6476
2018 HONO CR-V LX 4D UTV 4-2.41Gasoline Gasoline Drrect lnjedion SURGANDY
SUATOTAI.S 1,270.99 20,0
ESTIMATE TOTALS
Category 8asi6 Rat€c.sr $
Parb
Parts Discount
Body t bor
Paint Labor
Mechanical Labor
Paint Supplias
Misaellaneous
Other Orarges
1221.18
19.5 hrs
7.6 hrs
0.5 hrs
7.6 hrs
-5.O %
$ 44.00 /hr
i 44.00 /hr
$ 63.00 /hr
$ 34,00 /hr
@
@
@
@
810.99
-11.06
858.00
334.40
31.50
258.40
85.00
375.00
subtotal 2,742.23
Sales Tax t 988.31 @ 10.5m0 %r03.17
2,846.00
5@.00
500.00
II{SURAIICE PAY 2,3,15.O0
Regaster online to check tlE sbtus of your daim and stay conneded with State FamO. To register, 90 !o httpj/lvyvw.statefarm.com/
.nd select Check the St tus of a Oaim. If you are alrendy registrred. thank you!
FOR YOUR PROTECTION CAUFORNIA LAW REQUIRES THE FOLLOWING TO APPEAR ON THIS FORM: ANY PERSON
WHO KNOWINGLY PRESENTS FALSE OR FRAUDULENT CLAIM FOR THE PAYI1ENT OF A LOSS IS GUILTY OF A CRIME
AND T,IAY 8E SUBJECT TO FINES AND CONFINEI.4ENT IN STATE PRISON.
THE FOLLOWING I5 A UST OF ABBREVIATIONS OR SYMBOLS THAT MAY 8E USED TO DESCRIBE WORK TO 8E
DONE OR PARTS TO BE REPAIRED OR REPLACED:
MOTOR ABBREVIATIONS/SYMBOLS: D=DISCONTINUED PART, A=APPROXIMATE PRICE. LABOR TYPES: B=BODY
LABO( D=DIAGNOSTIC, E=EI"-ECTRICAL, F=FRAME, G=GLASS, I4=MECHANICAT P=PAINT LABOR,
S=STRUCTURAI. T=TAXED MISCELLANEOUS, X=NON TAXED I'IISCELIANEOUS. CCC ONE: ADJ=ADJACENT,
ALGN=AtlGN, A/M=AFTERI'1ARKET, BLND=BLEND, CAPA=CERTIFIED AUTOMOTIVE PARTS ASSOCIATION,
D&R=DISCONNECT AND RECONNECT, EST=ESTIMATE, EXT. PNCE=UNIT PRICE MULTIPUED BY THE QUANTITY,
INCL=INCLUDED, MISC=MISCEI.LANEOUS, NAGS=NATIONAL AUTO GLASS SPECFICATIONS, NON-ADJ=NON
ADJACENT, O/H=OVERHAUI OP=OPERATION, NO=UNE NUMBE& QTY=QUANTITY, RECOND=RECONDiTION,
REFN=REflNISH, REPL=REPLACE, R&I=REMOVE AND INSTAI.I, R&R=REMOVE AND REPLACE, RPR=REPAI&
RT=RIGHT, SECT=SECTION, SUBL=SUBLET, LT=LEFT, WO=WITHOUT, W_=WrrH/_ SYMBOLS: #=MANUAL UNE
ENTRY, *=OTHER IIE..MOTORS DATABASE INFORMAION wAS CHANGED], '*=DATABASE UNE WITH
AFTERIUARKET, N=NOTES ATTACHED TO UNE, OPT OEM=ORIGINAL EQUIPMENT MANUFACTURER PARTS EITHER
OPNONAI,I.Y SOURCED OR OTHERWISE PROVIDED WTTH SOI'4E UNIQUE PRICING OR DISCOUNT.
"CURE TIME" MEANS THE LENGTH OF TIME THAT, PER THE ADHESIVE I4ANUFACTURER, THE WINDSHIELD
ADHESIVE NEEDS TO CURE UNTIL THE WINDSHIELD CAN PROPERLY FUNCTION AS A SAFETY DEWCE PURSUANT
TO THE FEDERAL MOTOR VEHICLE SAFETY STANDARDS AND THE VEHICLE MANUFACTURER'S SPECIFICATIONS.
6/9/2020 1:55:a9 PIa 111359 Page 3
7,6
Grand Total
Huctible
CUSTOi{ER PAY
Estimate of Record
RO Numb€r: 5476
2018 HOND CR-V Lx 40 UTV 4-2.41Gasoline Gasoline oirect Injection EURGANoY
Estimate based on MOTOR CRASH ESTIMATING GUIDE and potentially other third party sources of data. Unless
otherwise noted, (a) all items are derived from the Guide ARG4464, CCC Datn Date 06/0U2020, and potentially other
third Frty sources of data; and (b) the parts presentd are OEM-parts. OEM parts are manufactured by or for the
vehicle's Original Equipment Manufacturer (OEM) according to OEM'S spe{ifications for U.S. distribution. OEM parts
are available at OE/Vehicle dealerships or the specified supplier. OPT OEM (Optional OEM) or ALT OEM (Alternative
OEM) parts are OEM parts that may be provided by or throuqh alternate sources other than the OEM vehicle
dealeBhips with discounted pricing. Asterisk (*) or Double Asterisk (**) indicates that the parts and/or labor data
provided by third party sources of data may have been modified or may have come from an alternate data source,
Tilde sign (-) items indicate MOTOR Not-Included Labor operations. The symbol (<>) indicates the refinlsh
operation WILL NOT be performed as a separate procedure from the other panels in the estimate. Non-Original
Equipment Manufacturer aftermarket parts are described as Non OEM, A,/M or NAGS. Used parts are described as
LKQ, RC/, or USED. Reconditioned parts are described as Recond. Recored parts are described as Recore. NAGS
Part Numbers and Benchmark Prices are provided by National Auto Glass Specifications. Labor operation times listed
on the line with the NAGS information are MOTOR suggested labor operation times. NAGS labor operation times are
not included. Pound sign (#) items indicate manualentries.
Some 2020 vehicles contain minor changes from the previous year. For those vehicles, prior to receiving updated
data from the vehicle manufacturer, labor and parts data from the previous year may be used. The CCC ONE
estimator has a list of applicable vehicles. Parts numbers and prices should be confirmed with the local dealership.
The following is a list of additional abbreviations or symbols that may be used to describe work to be done or parts to
be repaired or replaced:
SYMBOLS FOLLOWING PART PRICE:
m=MOTOR Mechanical component. s=MOTOR Stsuctural component. T=Miscellaneous Taxed charge category.
X=Miscellaneous Non-Taxed charge category.
SYMBOLS rcLTOWlNG LABOR:
D=Diagnostc labor category. E=Electical labor category. F=Frame labor category. G=Glass labor category.
M=Mechanical labor category. S-Structural labor category. (numb€6) l through 4=User Defined Labor Gtegories.
OTHER SYI,lBOLs AND ABEREVIATIONS:
Adj.=46.1u."n,. Algn.=Align. ALu=Aluminum. Iy'M=Aftermarket part. Blnd=Blend. BOR=Boron steel.
CAPA=Certified Automotive Parts Association. D&R=Disconnect and Reconnect. HSS=High Strength steel.
HYD=Hydroformed Steel. Incl.=Included. U<Q=Like Kind and Qualiry. LT=1eft. MAc=Magnesium. Non-Adj.=Non
Adiacent. NSF=NSF International Certified Part. O/H=Overhaul. Qty=Quantity. Refn=Refinish. Repl=Replace.
R&I=Remove and Install. R&R=Remove and Replace. Rpr=Repair. RT=Right. SAS=Sandwiched Steel.
Sect=Section. Subl=sublet. tlHs=Ultra Hiqh Strenqth Steel. N=Note(s) associated with the estimate line.
CCC ONE Estimating - A product of CCC Information Services lnc.
The following is a list of abbreviations that may be used in CCC ONE Estimating that are not part of the MOTOR
CRASH ESTIMATING GUIDE:
BAR=Bureau of Automotive Repair. EPA=Environmental Protection Agency. NHTSA= National Highway
Transportation and Safety Administration. PDR=Paintless Dent Repair. VIN=Vehicle Idenuflcation Number.
6/9/2020 li55:a9 PIa 311359 Page 4
Photographs
1n
,l I
!
t-
-
t
't
I
E
I
t
E
I
.t
t
l
I
re=--4rc:----
L.
I
I
\{
\1
\
I
7
I
I
't
q I
\j
I
.4,e
i I
E-
a
I
I
7
)
I q
I
I
ar
I
I
tIf
I
I
I I
,
I ,
;
I
{
]f
-?
N It
)
:\,
F..!
G
I!E
.tI
I
;
+l
E
-
I
t
I
trt
I
Iii{
\
I
T
t
t
!l
7\
',j ::-;..g
=
rEEr tu
lEi.a I
I
I
*t:
i,.t
I
I
/
't
il
'/
tr
I
lil
,'f
ln
0r
E
ul
IIl
ot[
0
'!
q,rI
son
l\,i
EIoIo
3mo'lr5o
8i
Et6
I.i)
b
s
.1B
oloo3
T
6.Io.
!
tn
t4
g
o
E
lP
B
($
v
o
rc
A
II
-- ,t.. 1$H
To'4
(lt
o
:o
N
t-.t-
ooa(-)
--1m()
TI
rJ
(.)
s
t.)$
:Q
I
Tm
I
o
s
<t,o
$n(t
o
v
g't
frsag'riEIQ6'- o6g(!
E2l,)
d
ta
alt
G3q
f
a
E
at)
0
mIm
I
J
ta-
II
itn
tlr
E
UI
FI
E
l0
I[
t
l
I
.,
\EI
Vt
E
F
L
i
I
bi
,
a
{
tn
tlr
E
ul
I
IIltl
t0
t0
I
ffi
s*:f\)O
o0r
3
!Don
t9
Pr6t,oTo
5m()
3(f,
a
Eg
A6
6
oAi
Es
oE
t
tI
OIoo,o
tJ)
g
n
s
Eo
$vI'.r9ag$
.o(tB;
E8ood*
oS
ocl0eo
a.o
6ro
c0
3ol
(\
c)
r.t'1
]U
I
(
J
tn
^,\.t
n
i
$
t r'f,
tF
it
I
/
b<lo
ln
urt
ul
tlltt
IE
f[
I
;.\}o
6IIo,ooD
n}
F
a-50o
:Eo
3mo
3d
xN
=rp*h)
(o
B
s,
f,.lr
t
I
$-i$o.,{lo
E .,l&g Eli
Eil*G IDIa -t- ol'gl
EI6l
tDtolnI{)to!3irD!5:
siori
{
1\(
il
m
(I
ilI
I
AG
l
b
!)
Dt)
--
I
{.
o
ln
0r
E
ul
tllI
l0
0
t
b
!_ 'r!NJd
(o
ao
'o.6)(,
TI<
P
f-r
rJoa()
5o
3(,
EtPIN
G)
.)
$ao
iFf)
o
f'
a1s
o:0)
o&te
-ut
et6o
tD3ot
s
tD
^f
0
@
6o
3o
C\6
oo
6
c.
at
l
I
)
t
l
I
7
{
I
I
I
I
F..--r
1/
/
I
t
,("@
t
b
.-i
a')o
oI(}
ts
(1a
t.r
F
f$
C,oIc)
3mo
3o
f;h}a{a6xtga
5
.r)
$
I
v
<t
ID5'
n.
rgao
$
o
rnrb
rD
TII
'lD
ts.ttIo36IasE
p
q)
n
5tttI
E
a
(
f
ox.(r,t
rn!ailI
\
,
-':,:
I
\
I
-
I
a
f
J,
{
II
T
/
I
t
I
A
@G
l
I
j
I
i
i
i
l
UI
Br
E
rfl
I
Irl
tT
m
E
I
b
'.tit,c
(o
I
3o-olon
lo
P
&ooIo
g
mo
3I
xA)
:(otl\)A
<o
'D
s
)
0-{B O E'.9a.r fn o {r;5 6 EH'f u i;3r!ji,^g, ? sii.,bdoato.-C}\.<O 6gtsoe$2o
aEg
(D
3,o)
sc,
<l
7/
\t
rft
\II
J
I
I
{
f
Z!G
\\
I
\.
t_:\
ii
"V
fr
lory lt
I
,1 ,l
I I
!t
I a
I b..
I
ljr.\
l'
L:
T7 .\
Iltt'fr 7.
,
I /
l^
t
t
I
N I EZ
| ., .-_
t
;-4
t7.i
|'I -.-\- ]
.lL-)\,t
I!
,/
t,'l I
I .t
a<'
,r_--,
=
\.-....
_. r- r..i'*
t )
)l\
I
I
)
?
5
,*.
1
EBr I
7
.10
I mps qp
mllea
mlles
3
TRIPA
I
I
I
../
I
\
\I
I
r.!
\
_1
E L.-
I
\E--
r-t I I a
&EE 4
-_-\IE.I /
l
I
,-
*
:
,TI \I +.
N
E.r
T
t_
\-ru
HI
3n .J
\
\
It
1
I\
I
If,,
\f-.I
tt
\
I
ll
\:
r.t
1
I
-l
r
/
!l
I
EB
:
E
I
'
'-)d t a
I \\
B\*
I
II I
I
2
.4,
I--
z--/
!
\l
I
+/
lt ,7'
=
/
,
t
a
V
q
['
L.
\'
1,/
)
/
\
)t
ll
L
I
t
lI
7-\
\1
I I t
Tr
{
c
I
I
t
t
t Ir\
trl
{
t \
t
\
t
.-L--I
-<,,
)
\1+L
)t
d
A.I
z1
t
I
t"l
l
i
l
-- \-rpt=*
--
,)
IE D
,l I
1-'
D
=.
I
t
t
l.
I
\
s
,
E I
,,
/4
I
T
=.ilE!
t !I
a
=R{
r$,
rt$
e!
{
{
tt L
\
{
\
11
/:
L
j
,4 'tl{
.\zI
-
\h--FT
t,
/
)
I
EI
L
ffi !t
I
j
71
tl
II\'.{,
A"l'
,
a,-4l?*t
I,
A
2
wI
/I
t t,
T
,/
\
Il
,;l
\!!!t11,,\
s
I
I
rI
(l,>..,hlr
!
I
N/
t
\t
I
l'-rriJ.I
/
/I
f1
,),
/
/1,
.r'_{.:'Jr'q
Iv
rlI/
It'
--;-r.\-fl
I
)
)
,
a.t
a!
tk --'.1--l-_
ILT tu
W
\
',--r4 .,,/:r_
fr,t.it
(lB
til't rlri
I
tl I
-],
I
E I
J
ffi,t
a
t\i\
\,
\\\
\I!
gil
TI
\
J
dt
'lG
lI
\If,
I
rrr ,
\I
!
'1,
t
\r
5
\
-t-
F
\,,
i
\
\
I ir
l/v T
t
I t ')rt,,
ET
\
I
(
F
I
t -.=\
&*,
t.
l. Il. I
-1
t>-\
tr
.J,
rl
I
t
)N
,\
t
I
I
x
L'-J
I
nr
.}
a
I \
RBZOOOHK
Stata Farm tlutual Automobile lnsurance Company
Auto Claim File Print
Financial lnformation
StateFarm
Route To
&.
BASIC CLAIM INFORMATION
Clalm Numben 75-07P0-91S
Dalo of Loss: 064$2020
Pollcy NumboE
l{amod lrsured: SANCHEZ, LEYDI Y
' = Forced CoverageCoveragg in Force
A 25150/50,D500.G500,H.R,l 25/600.u 25150,U1
Named lnsured(s)
390 - Comp-Misc
Status
PO - 0747-2020
lndomnlw Paid
12,861.8,1
A$islelLls
CA Negotiation
Attorney Rep
Location
T'rer: Tier Rgason:
89!@&ng.gl
0
S!b/salvaq.
10.00
Unit
EXP u Assignment UnitExpress Team U
(0016948232171)
Covgl".oe Tvoo
Primary
ErDonse3 Paid
50.00
lratter:
Larl Rsaetue
2.240
Nst lndemnltv
s2.861.8.1
PJ
ExP Shared Demand
Ofllce
Named lnsured(s)
501 - Rental Reimbursement
sElcs
PD - 06-21-2020
lndomnitv P.ld
s255.84
A3sionod To
CA Negotiation
Attomey Rep:
Location
Tier: Tier Reason
8999!ro-A!!g!!
0
Subrsalvaoe
s0.00
!E!
EXP U Assignment UnilExpress Team U
(0016948232171)
coveraoe TvDo
Primary
Ero€ns6 Paid
$0 00
atter
Lalt Reservs
280
Iel lndemnitv
$255.84
sg
EXP Shared Oemand
Offce
CLAIM TOTALS
lndsmnlw Paid
$2.861.84
$255.84
Ded Rotund
10.00
50.00
Scllgrly3ic
$0.00
$0.00
!9!!ggmnEt
s2,861.E4
$25s.84
Exoense3 Paid
$0.00
$0.00501 / Named S
cOUParticipant
390 / Named lnsured(s)
$0.00$3.1'17.68$0.00$0.00$3,117.68Totals:
Proof of Payment
STATE FARM CONFIOENTIAL INFORMATION
Distribution on a Business Need to Know Basis Only
Dale: 11-30-2020 Page 1
FINANCIAL SUMMARY
AUTO Claim Numbe.: 7 ,7P0-91S RBZOOOHK
PAYMENTS
C denotes consolidated paymenl
E denotes EFT payment
P previously convened paymenl lrom CAT/CMR
Pavment l{umber
123402630K E
123385547K E
lssued Oate Paves
0747-2020 R,B. PAINTAND BODY
06-21-2020 HERTZ LOCAL EDITION
Status
Paid
Paid
Amount Auth IO
$2,861.84 ECSAPY
$255.84 ECSAPY
s3,117.68Grand Total:
Continued on Claim File P - File Hi lnformation re
Date: 11-30-2020
STATE FARM CONFIDENTIAL INFOR[4ATION
Distribution on a Business Need to Know Basis Only
Page 2
City Council Agenda Item Report
Agenda Item No. COV-438-2020
Submitted by: John Lau
Submitting Department: Finance/Treasury
Meeting Date: December 15, 2020
SUBJECT
City Payroll Warrant Register
Recommendation:
Approve City Payroll Warrant Register No. 774, for the period of November 1 through November 30,
2020, which totals $4,014,048.08 and consists of ratification of direct deposits, checks and taxes totaling
$3,061,210.91 and ratification of checks and electronic fund transfers (EFT) for payroll related
disbursements totaling $952,837.17 paid through operating bank account.
Background:
Section 2.13 of the Vernon Municipal Code indicates the City Treasurer, or an authorized designee, shall
prepare warrants covering claims or demands against the City which are to be presented to City Council
for its audit and approval. Pursuant to the aforementioned code section, the City Treasurer has prepared
City Payroll Account Warrant Register No. 774 covering claims and demands presented during the
period of November 1 through November 30, 2020, drawn, or to be drawn, from East West Bank for City
Council approval.
Fiscal Impact:
The fiscal impact of approving City Payroll Warrant Register No. 774, totals $4,014,048.08. The Finance
Department has determined that sufficient funds to pay such claims/demands, are available in the
respective accounts referenced on City Payroll Warrant Register No. 774.
Attachments:
1. City Payroll Account Warrant Register No. 774
Raquel Franco | 12/7/2020 3:05 PMPAYROLL WARRANT REGISTERCity of VernonNo.774Month ofDecember 2020I hereby Certify: that claims or demands covered by the This is to certify that the claims or demandsabove listed warrants have been audited as to accuracycovered by the above listed warrants have beenand availability of funds for payments thereof; and that audited by the City Council of the City of Vernonsaid claims or demands are accurate and that funds are and that all of said warrants are approved for pay-available for payments thereof. mentsScott A. WilliamsDATEDirector of Finance/City TreasurerDATEDate:Page 1 of 1Payroll Warrant Register Memo (002) : Warrant12/08/2020
Payrolls reported for the month November:
10/11/20 - 10/24/20, Paydate 11/05/20
10/11/20 - 10/24/20, Paydate 11/05/20
10/25/20 - 11/07/20, Paydate 11/19/20
Payment
Method Date Payment Description Amount
CHECKS 11/05/20 Net payroll, checks 10,323.87$
ACH 11/05/20 Net payroll, direct deposits 706,923.21
ACH 11/05/20 Payroll taxes 187,616.24
ACH 11/05/20 Net payroll, direct deposits 969,437.94
ACH 11/05/20 Payroll taxes 445,129.48
CHECKS 11/19/20 Net payroll, checks 10,610.82
ACH 11/19/20 Net payroll, direct deposits 575,620.74
ACH 11/19/20 Payroll taxes 155,548.61
Total net payroll and payroll taxes 3,061,210.91
606477 11/05/20 Franchise Tax Board 242.31
10552 11/05/20 Vernon Police Officers Benefit Association 2,033.04
10553 11/05/20 IBEW Union Dues 3,169.67
10554 11/05/20 ICMA Retirement Trust 457 87,943.70
10514 11/24/20 Blue Shield of California 350,246.16
10515 11/24/20 MetLife - Group Benefits 29,387.86
10516 11/24/20 Mutual of Omaha 10,058.72
10566 11/12/20 Colonial 5,940.46
10567 11/13/20 AFLAC 11,677.04
10568 11/30/20 MES Vision 4,630.51
10557 12/03/20 CalPERS 238,303.00
10558 11/05/20 State Disbursement Unit 789.22
606553 11/19/20 Franchise Tax Board 242.31
10559 11/19/20 Vernon Police Officers Benefit Association 2,033.04
10560 11/19/20 Teamsters Local 911 2,196.00
10561 11/19/20 ICMA Retirement Trust 457 23,109.33
10564 12/07/20 CalPERS 180,724.04
10565 11/20/20 State Disbursement Unit 110.76
Payroll related disbursements, paid through
Operating bank account 952,837.17
Total net payroll, taxes, and related disbursements 4,014,048.08$
Page 1 of 1
City Council Agenda Item Report
Agenda Item No. COV-439-2020
Submitted by: John Lau
Submitting Department: Finance/Treasury
Meeting Date: December 15, 2020
SUBJECT
Operating Account Warrant Register
Recommendation:
Approve Operating Account Warrant Register No. 58, for the period of November 15 through November
28, 2020, which totals $9,099,407.66 and consists of ratification of electronic payments totaling
$8,952,303.19 and ratification of the issuance of early checks totaling $147,104.47.
Background:
Section 2.13 of the Vernon Municipal Code indicates the City Treasurer, or an authorized designee, shall
prepare warrants covering claims or demands against the City which are to be presented to City Council
for its audit and approval. Pursuant to the aforementioned code section, the City Treasurer has prepared
Operating Account Warrant Register No. 58 covering claims and demands presented during the period
of November 15 through November 28, 2020, drawn, or to be drawn, from East West Bank for City
Council approval.
Fiscal Impact:
The fiscal impact of approving Operating Account Warrant Register No. 58, totals $9,099,407.66. The
Finance Department has determined that sufficient funds to pay such claims/demands, are available in
the respective accounts referenced on Operating Account Warrant Register No. 58.
Attachments:
1. Operating Account Warrant Register No. 58
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020I hereby cerƟfy that claims and/or demands included in above listed warrantregister have been audited for accuracy and availability of funds for payments andthat said claims and/or demands are accurate and that the funds are available forpayments thereof.____________________________________________________________ScoƩ WilliamsDirector of Finance / City TreasurerDate: _______________________________________________________This is to cerƟfy that the claims or demands covered by the above listed warrantshave been audited by the City Council of the City of Vernon and that all of saidwarrants are approved for payments except Warrant Numbers:________________________________________________________________________________________________________________________Printed: 12/3/2020 11:06:33AM12/08/2020
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500150 $ ‐0.21 RecalculaƟon Charges 10/20 202011103147358677CALIFORNIA ISO002412 ‐ 055.9200.500150 $ 27.17 RecalculaƟon Charges 10/20 202011103147358677055.9200.500190 $ 21,621.45 IniƟal Charges 11/20 202011103147358743055.9200.500210 $ 9,253.86 IniƟal Charges 11/20 202011103147358743055.9200.500150 $ 979,367.18 IniƟal Charges 11/20 202011103147358743055.9200.500170 $ ‐3,211.03 IniƟal Charges 11/20 202011103147358743055.9200.500150 $ 25,234.04 RecalculaƟon Charges 10/20 202011103147358743055.9200.500170 $ 716.58 RecalculaƟon Charges 10/20 202011103147358743055.9200.500190 $ 196.36 RecalculaƟon Charges 10/20 202011103147358743055.9200.500210 $ 179.81 RecalculaƟon Charges 10/20 202011103147358743$ 1,033,385.2111/16/2020 10485011.9019.590110 $ 7,200.96 Peak Agenda Mgmt Annual SubscripƟon~ IN865234 011.0014559CARAHSOFT TECHNOLOGY CORPORATI006518 ‐ $ 7,200.9611/17/2020 10486Printed: 12/3/2020 11:06:33AMPage 1 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.596200 $ 1,250.00 OTC Commission Adjustment 1020001688088ICE US OTC COMMODITY MARKETS,004500 ‐ $ 1,250.0011/17/2020 10487055.9000.596200 $ 8,465.25 Env Compliance Support Services D3404500004JACOBS ENGINEERING GROUP, INC006886 ‐ $ 8,465.2511/17/2020 10488011.9019.860000 $ 9,120.00 Workforce Central SoŌware 11635770KRONOS INCORPORATED005034 ‐ 011.9019.860000 $ 1,560.00 Workforce Central SoŌware 11646824011.9019.590110 $ 832.19 Hardware & SoŌware Usage Fees 11670213$ 11,512.1911/17/2020 10489011.1049.590000 $ 3,582.00 Landscape Maintenance 10/20 90976MARIPOSA LANDSCAPES, INC006422 ‐ $ 3,582.0011/17/2020 10490020.1084.900000 $ 41,722.75 Technical Design Services 1783NORTHWEST ELECTRICAL SERVICES,005614 ‐ 020.1084.900000 $ 38,077.25 Technical Design Services 1783$ 79,800.0011/17/2020 10491011.1024.593200 $ 51.40 Re: Los Angeles MS4 Permit PeƟƟon 228982RICHARDS, WATSON & GERSHON003900 ‐ $ 51.4011/17/2020 10492011.1024.593200 $ 532.50 Re: Torres ArbitraƟon 880700RUTAN & TUCKER, LLP005433 ‐ $ 532.5011/17/2020 10493Printed: 12/3/2020 11:06:33AMPage 2 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1043.595200 $ 7,186.25 ADA Self EvaluaƟon & TransiƟon Plan 245726SALLY SWANSON ARCHITECTS, INC006702 ‐ $ 7,186.2511/17/2020 10494011.9019.590110 $ 1,122.50 Enterprise Vault Discovery Renewal~ 2200376703 011.0014607VERITAS TECHNOLOGIES, LLC006791 ‐ 011.9019.590110 $ 2,100.00 Enterprise Vault Email Renewal~ 2200376703 011.0014607011.9019.590110 $ 1,757.50 Enterprise Vault Archive Renewal~ 2200376703 011.0014607$ 4,980.0011/17/2020 10495011.1043.520000 $ 98.55 Paving Materials~ 72717471 011.0014469VULCAN MATERIALS CO001695 ‐ $ 98.5511/17/2020 10496011.1043.590000 $ 10,250.00 Street Sweeping Services 10/20 LB5568WEBCO LB, LLC005699 ‐ $ 10,250.0011/17/2020 10497011.1049.590000 $ 1,678.62 Air CondiƟoner Maintenance 627112WESTERN ALLIED CORPORATION006120 ‐ 011.1049.590000 $ 794.80 Air CondiƟoner Maintenance 627167$ 2,473.4211/17/2020 10498020.110010 $ 204.78 Ref. Temporary Hydrant~ 111620ZIM INDUSTRIES, INC006651 ‐ $ 204.7811/17/2020 10499Printed: 12/3/2020 11:06:33AMPage 3 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.9019.590110 $ 2,653.34 2 Collector SoŌware Maintenance & K16140020101 011.0014600ZONES, INC005784 ‐ 011.9019.590110 $ 2,532.60 DatAlert Suite SoŌware Maintenance & K16140020101 011.0014600011.9019.590110 $ 1,887.30 Data ClassificaƟon Framework for K16140020101 011.0014600011.9019.590110 $ 2,211.30 DatAdvantage for Windows SoŌware~ K16140020101 011.0014600011.9019.590110 $ 1,266.30 DatAdvantage for Directory Services K16140020101 011.0014600011.9019.520010 $ 4,120.94 SonicWall NSA 4600 PERP K16217460101 011.0014606011.9019.520010 $ 422.40 Sales Tax 10.25 K16217460101$ 15,094.1811/17/2020 10500011.1026.596200 $ 9,400.00 Medical Services 06/20 2861VITAL MEDICAL SERVICES, LLC006523 ‐ 011.1026.596200 $ 376.00 Medical Services 08/20 2941011.1026.596200 $ 6,204.00 Medical Services 07/20 2942$ 15,980.0011/17/2020 10501Printed: 12/3/2020 11:06:33AMPage 4 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.9019.520010 $ 6,235.63 Canon imageFORMULA DR‐G2140 USB~ 1954802011.0014569CDW GOVERNMENT, INC000447 ‐ 011.9019.520010 $ 592.38 Sales Tax 9.5% 1954802011.9019.520010 $ 154.00 StarTech.com Full MoƟon TV Wall Mount 2129187 011.0014558011.9019.520010 $ 800.74 APC Smart‐UPS X 120V External BaƩery 2129187 011.0014558011.9019.520010 $ 2,030.75 APC Smart‐UPS X 3000VA Rack/Tower LCD 2129187 011.0014558011.9019.520010 $ 164.92 StarTech.com USB 3.0 to Gigabit 2129187 011.0014558011.9019.520010 $ 169.65 TRENDnet TPE‐115GI Power over Ethernet 2129187 011.0014558011.9019.520010 $ 83.09 Belkin MIXIT. 2.0 USB‐A to USB‐C Charge 2129187 011.0014558011.9019.520010 $ 264.56 NETGEAR 8‐Port Gigabit Ethernet Smart 2129187 011.0014558011.9019.520010 $ 14.63 Sales Tax 9.5% 2129187011.9019.520010 $ 333.80 Sales Tax 9.5% 2129187011.9019.590110 $ 8,019.00 PFPT ESSENTIALS ADV SAAS 1~ 2159442 011.0014567$ 18,863.1511/19/2020 10502Printed: 12/3/2020 11:06:33AMPage 5 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1043.540000 $ 63.57 Uniforms 4058002491CINTAS CORPORATION005490 ‐ 011.1046.540000 $ 42.38 Uniforms 4058002491011.1047.540000 $ 42.38 Uniforms 4058002491011.1049.540000 $ 63.56 Uniforms 4058002491011.1043.540000 $ 79.48 Uniforms 4058631591011.1046.540000 $ 52.99 Uniforms 4058631591011.1047.540000 $ 52.99 Uniforms 4058631591011.1049.540000 $ 79.48 Uniforms 4058631591011.1043.540000 $ 67.09 Uniforms 4059293746011.1046.540000 $ 44.73 Uniforms 4059293746011.1047.540000 $ 44.73 Uniforms 4059293746011.1049.540000 $ 67.08 Uniforms 4059293746011.1043.540000 $ 68.35 Uniforms 4059967772011.1046.540000 $ 45.57 Uniforms 4059967772011.1047.540000 $ 45.57 Uniforms 4059967772011.1049.540000 $ 68.35 Uniforms 4059967772011.1043.540000 $ 64.50 Uniforms 4060579115011.1046.540000 $ 43.00 Uniforms 4060579115011.1047.540000 $ 43.00 Uniforms 4060579115011.1049.540000 $ 64.51 Uniforms 4060579115011.1043.540000 $ 64.81 Uniforms 4061158521011.1046.540000 $ 43.21 Uniforms 4061158521011.1047.540000 $ 43.21 Uniforms 4061158521Printed: 12/3/2020 11:06:33AMPage 6 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1049.540000 $ 64.80 Uniforms 4061158521CINTAS CORPORATION005490 ‐ 011.1043.540000 $ 64.50 Uniforms 4061891309011.1046.540000 $ 43.00 Uniforms 4061891309011.1047.540000 $ 43.00 Uniforms 4061891309011.1049.540000 $ 64.51 Uniforms 4061891309011.1043.540000 $ 64.50 Uniforms 4062467809011.1046.540000 $ 43.00 Uniforms 4062467809011.1047.540000 $ 43.00 Uniforms 4062467809011.1049.540000 $ 64.51 Uniforms 4062467809011.1043.540000 $ 64.50 Uniforms 4063127600011.1046.540000 $ 43.00 Uniforms 4063127600011.1047.540000 $ 43.00 Uniforms 4063127600011.1049.540000 $ 64.51 Uniforms 4063127600011.1043.540000 $ 68.74 Uniforms 4063846550011.1046.540000 $ 45.83 Uniforms 4063846550011.1047.540000 $ 45.83 Uniforms 4063846550011.1049.540000 $ 68.73 Uniforms 4063846550011.1046.540000 $ 43.00 Uniforms 4064507193011.1047.540000 $ 43.00 Uniforms 4064507193011.1049.540000 $ 64.50 Uniforms 4064507193011.1043.540000 $ 64.50 Uniforms 4064507193011.1043.540000 $ 64.50 Uniforms 4065139343011.1046.540000 $ 43.00 Uniforms 4065139343Printed: 12/3/2020 11:06:33AMPage 7 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1047.540000 $ 43.00 Uniforms 4065139343CINTAS CORPORATION005490 ‐ 011.1049.540000 $ 64.50 Uniforms 4065139343011.1043.540000 $ 64.50 Uniforms 4065818612011.1046.540000 $ 43.00 Uniforms 4065818612011.1047.540000 $ 43.00 Uniforms 4065818612011.1049.540000 $ 64.50 Uniforms 4065818612$ 2,878.5011/19/2020 10503011.1021.797000 $ 8,100.00 Professional Services~ SEP20JEMMOTT ROLLINS GROUP, INC005108 ‐ $ 8,100.0011/19/2020 10504020.1084.840000 $ 27,443.68 New/Unused 2020 Ford Escape (U0B)~ WF554 011.0014300NATIONAL AUTO FLEET GROUP005632 ‐ 020.1084.840000 $ 8.75 Tire Fee WF554 011.0014300020.1084.840000 $ 2,607.15 Sales Tax 9.5% WF554$ 30,059.5811/19/2020 10505056.5600.595200 $ 826.99 Clean, Test, & Recalibrate EZ Fuse 140234INP&F DISTRIBUTORS003332 ‐ 056.5600.596700 $ 1,500.00 Fusion CerƟficaƟon 140235IN056.5600.595200 $ 12.40 Finance Charge NOV0306FC056.5600.596700 $ 22.50 Finance Charge NOV0306FC056.5600.595200 $ 12.40 Finance Charge OCT0268FC056.5600.596700 $ 22.50 Finance Charge OCT0268FC$ 2,396.7911/19/2020 10506Printed: 12/3/2020 11:06:33AMPage 8 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9000.596200 $ 15,000.00 ConsultaƟon & Support Services VERNPVHPORT CANAVERAL PWR CONSULTANTS002459 ‐ $ 15,000.0011/20/2020 10507055.9200.500180 $ 1,000.00 Capacity Charges 10/20 111020ARIZONA ELECTRIC POWER COOPERA006877 ‐ $ 1,000.0011/20/2020 10508055.9200.500180 $ 55,800.00 Capacity Charges 10/20 257369CITY OF RIVERSIDE002581 ‐ $ 55,800.0011/20/2020 10509055.9200.500180 $ 12,750.00 North System 150PIONEER COMMUNITY ENERGY006802 ‐ $ 12,750.0011/20/2020 10510055.9200.500150 $ 373,470.43 Monthly Energy Related Payment 10202001BICENT (CALIFORNIA) MALBURG, L003336 ‐ 055.9200.500180 $ 3,657,717.61 Monthly Capacity Payment 10202001055.9200.500150 $ ‐406.77 Fuel Burden 10202001055.9200.500150 $ ‐104,683.00 HR Bonus Overpayment 10202001$ 3,926,098.2711/23/2020 10511Printed: 12/3/2020 11:06:33AMPage 9 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500150 $ 40,438.89 RecalculaƟon Charges 10/20 202011173147440880CALIFORNIA ISO002412 ‐ 055.9200.500170 $ 47,115.61 RecalculaƟon Charges 10/20 202011173147440880055.9200.500180 $ 189.95 RecalculaƟon Charges 10/20 202011173147440880055.9200.500190 $ 1,868.79 RecalculaƟon Charges 10/20 202011173147440880055.9200.500210 $ 262.70 RecalculaƟon Charges 10/20 202011173147440880055.9200.500240 $ 275.78 RecalculaƟon Charges 10/20 202011173147440880055.9200.500150 $ ‐113,026.94 RecalculaƟon Charges 08/20 202011173147440880055.9200.500170 $ ‐1,845.74 RecalculaƟon Charges 08/20 202011173147440880055.9200.500180 $ ‐108.80 RecalculaƟon Charges 08/20 202011173147440880055.9200.500190 $ ‐8,654.44 RecalculaƟon Charges 08/20 202011173147440880055.9200.500210 $ ‐7.05 RecalculaƟon Charges 08/20 202011173147440880055.9200.500150 $ 292,516.66 IniƟal Charges 11/20 202011173147440880055.9200.500210 $ 14,046.24 IniƟal Charges 11/20 202011173147440880055.9200.500170 $ ‐7,137.63 IniƟal Charges 11/20 202011173147440880Printed: 12/3/2020 11:06:33AMPage 10 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500190 $ ‐6,148.43 IniƟal Charges 11/20 202011173147440880CALIFORNIA ISO002412 ‐ 055.9200.500150 $ 2,116.80 RecalculaƟon Charges 11/20 202011173147440880055.9200.500170 $ 183.05 RecalculaƟon Charges 11/20 202011173147440880055.9200.500190 $ ‐61.05 RecalculaƟon Charges 11/20 202011173147440880055.9200.500210 $ ‐13.04 RecalculaƟon Charges 11/20 202011173147440880$ 262,011.3511/23/2020 10512011.1026.502031 $ 13,759.27 Medical ReƟrees~ 166623983ANTHEM BLUE CROSS005182 ‐ $ 13,759.2711/24/2020 10513055.9200.500160 $ 20,077.00 Biomethane RPS102020BIOFUEL GENERATION SERVICES, L005067 ‐ $ 20,077.0011/24/2020 10517055.9200.500160 $ 69,600.00 Natural Gas 10/20 66373CALPINE ENERGY SERVICES, LP002060 ‐ $ 69,600.0011/24/2020 10518055.9200.500160 $ 37,965.00 Natural Gas 10/20 1020107280CIMA ENERGY, LP006298 ‐ $ 37,965.0011/24/2020 10519055.9200.500160 $ 11,100.00 Natural Gas 10/20 147789CONOCOPHILLIPS COMPANY005388 ‐ $ 11,100.0011/24/2020 10520Printed: 12/3/2020 11:06:33AMPage 11 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500160 $ 151,977.50 Natural Gas 10/20 1106416EDF TRADING NORTH AMERICA, LLC004116 ‐ $ 151,977.5011/24/2020 10521055.9200.500162 $ 49,330.09 Biomethane Gas 10/20 RC4019ELEMENT MARKETS RENEWABLE NATU004665 ‐ 055.9200.500162 $ 71,624.02 Biomethane Gas 10/20 RC4020$ 120,954.1111/24/2020 10522055.9200.500160 $ 783,365.00 Natural Gas 10/20 GASI00146963MACQUARIE ENERGY, LLC006086 ‐ $ 783,365.0011/24/2020 10523055.9200.500160 $ 37,800.00 Natural Gas 10/20 230180PACIFIC SUMMIT ENERGY, LLC005908 ‐ $ 37,800.0011/24/2020 10524011.1048.590000 $ 4,975.00 Re‐joint, Sand and Paint Interior of 249ELEMENT PAINTING & DECOR006857 ‐ $ 4,975.0011/24/2020 10525011.9019.520010 $ 690.00 2MP HDCVI MOTOTRIZED BULLET CAMERA 2.719782177 011.0014591ETC DEPOT005460 ‐ 011.9019.520010 $ 500.00 8CH HDCVI/AHD/TVI/CVBS/IP~ 19782177 011.0014591011.9019.520010 $ 110.00 DC12V, 10amp, 9ch Power Supply 19782177 011.0014591011.9019.520010 $ 10.00 MALE PIGTAIL 19782177 011.0014591011.9019.520010 $ 40.00 Freight 19782177 011.0014591011.9019.520010 $ 124.45 Sales Tax 9.5% 19782177$ 1,474.4511/24/2020 10526Printed: 12/3/2020 11:06:33AMPage 12 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE020.1084.900000 $ 278,590.00 Well & Booster Pump Maintenance 28267GENERAL PUMP COMPANY, INC000147 ‐ $ 278,590.0011/24/2020 10527011.9019.590110 $ 2,900.00 1‐year Capture Advanced Threat 70464807 011.0014568GOVCONNECTION, INC001729 ‐ $ 2,900.0011/24/2020 10528055.8400.590000 $ 672.50 Quarterly InspecƟon 12/20 154387048KONECRANES, INC002169 ‐ $ 672.5011/24/2020 10529011.1049.590000 $ 2,392.00 Turf RenovaƟon 91042MARIPOSA LANDSCAPES, INC006422 ‐ 011.1049.590000 $ 677.00 IrrigaƟon Repairs 91175$ 3,069.0011/24/2020 10530011.1004.520000 $ 198.86 Postage 776343NDS006687 ‐ $ 198.8611/24/2020 10531055.9200.596200 $ 841.76 Electronic Tagging~ 159417 055.0002815OPEN ACCESS TECHNOLOGY INTL, I000629 ‐ $ 841.7611/24/2020 10532056.5600.590000 $ 193.47 Finance Charge MAY0075FCP&F DISTRIBUTORS003332 ‐ 056.5600.520000 $ 132.62 Finance Charge MAY0527056.5600.520000 $ 4.86 Finance Charge SEP0705FC$ 330.9511/24/2020 10533Printed: 12/3/2020 11:06:33AMPage 13 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE020.1084.900000 $ 19,515.00 Design Services 4413PACIFIC ADVANCED CIVIL ENGINEE006787 ‐ $ 19,515.0011/24/2020 10534055.9200.596200 $ 6,393.75 SoŌware Services Fee 12/20 VERN61POWER SETTLEMENTS CONSULTING &005658 ‐ $ 6,393.7511/24/2020 10535055.9000.596200 $ 2,419.20 ResoluƟon Billing 1120REVISEDSO CAL PUBLIC POWER AUTHORITY002517 ‐ 055.9200.596200 $ 8,051.84 ResoluƟon Billing 1120REVISED$ 10,471.0411/24/2020 10536011.1043.590000 $ 8,803.76 Traffic Signal Maintenance 5620031869SIEMENS MOBILITY, INC001079 ‐ 011.1043.590000 $ 1,246.50 Traffic Signal Maintenance 5620032256$ 10,050.2611/24/2020 10537055.9200.500170 $ 24,669.00 Laguna Bell 11/20 7501201262SO CAL EDISON000059 ‐ 055.9200.500170 $ 53,460.00 Victorville Lugo Vernon 11/20 7501201297055.9200.500170 $ 126,360.00 Mead Laguna Bell 11/20 7501201298$ 204,489.0011/24/2020 10538055.9200.500150 $ 15,473.79 Boulder Canyon Project Charges 10/20 GG1766W1020US DEPARTMENT OF ENERGY002227 ‐ 055.9200.500180 $ 29,212.33 Boulder Canyon Project Charges 10/20 GG1766W1020$ 44,686.1211/24/2020 10539Printed: 12/3/2020 11:06:33AMPage 14 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE020.1084.520000 $ 254.75 Paving Materials~ 72734708 011.0014444VULCAN MATERIALS CO001695 ‐ 020.1084.520000 $ 533.72 Paving Materials~ 72741978 011.0014444020.1084.520000 $ 246.08 Paving Materials~ 72744101 011.0014444020.1084.520000 $ 83.81 Paving Materials~ 72749171 011.0014444$ 1,118.3611/24/2020 10540020.272010 $ 34,883.72 Quarterly Payment No. 2~ 202002WATER REPLENISHMENT DISTRICT001658 ‐ $ 34,883.7211/24/2020 10541055.9000.900000 $ 1,180.00 Iridium 59569WIRELESS INNOVATION LIMITED004442 ‐ 055.9000.900000 $ 1,203.60 Iridium 60020055.9000.900000 $ 47.68 Iridium 60456$ 2,431.2811/24/2020 10542055.9200.500160 $ 57,000.00 Natural Gas 10/20 202010GS006THE GAS COMPANY001581 ‐ $ 57,000.0011/24/2020 10543055.9200.500170 $ 21,870.00 Electric Energy TransacƟons GA197707DEPARTMENT OF WATER & POWER002468 ‐ 055.9200.550022 $ 575.00 Electric Energy TransacƟons GA197707$ 22,445.0011/24/2020 10544055.9200.500160 $ 673,132.84 Natural Gas 10/20 3295277MERCURIA ENERGY AMERICA, LLC006262 ‐ $ 673,132.8411/24/2020 10545Printed: 12/3/2020 11:06:33AMPage 15 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.9019.590110 $ 16,799.34 Trend Micro Appliance Renewal~ IN000651637 011.0014490SOUTHERN COMPUTER WAREHOUSE, I006711 ‐ $ 16,799.3411/25/2020 10546011.1033.502020 $ 4.29 RBF: B. English 100000016195780CALPERS000714 ‐ $4.2911/17/2020 10547Printed: 12/3/2020 11:06:33AMPage 16 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1001.502020 $ 1,407.01 Monthly Expense of UAL~ 100000016223316CALPERS000714 ‐ 011.1002.502020 $ 9,185.37 Monthly Expense of UAL~ 100000016223316011.1003.502020 $ 5,282.91 Monthly Expense of UAL~ 100000016223316011.1004.502020 $ 19,485.72 Monthly Expense of UAL~ 100000016223316011.1024.502020 $ 4,672.32 Monthly Expense of UAL~ 100000016223316011.1026.502020 $ 9,557.03 Monthly Expense of UAL~ 100000016223316011.1031.502020 $ 16,485.87 Monthly Expense of UAL~ 100000016223316011.1033.502020 $ 3,743.17 Monthly Expense of UAL~ 100000016223316011.1040.502020 $ 6,636.83 Monthly Expense of UAL~ 100000016223316011.1041.502020 $ 8,787.16 Monthly Expense of UAL~ 100000016223316011.1043.502020 $ 27,025.15 Monthly Expense of UAL~ 100000016223316011.1046.502020 $ 5,123.63 Monthly Expense of UAL~ 100000016223316011.1047.502020 $ 4,884.70 Monthly Expense of UAL~ 100000016223316011.1048.502020 $ 2,468.90 Monthly Expense of UAL~ 100000016223316011.1049.502020 $ 5,309.46 Monthly Expense of UAL~ 100000016223316057.1057.502020 $ 1,035.34 Monthly Expense of UAL~ 100000016223316011.1060.502020 $ 11,415.34 Monthly Expense of UAL~ 100000016223316020.1084.502020 $ 21,954.62 Monthly Expense of UAL~ 100000016223316056.5600.502020 $ 9,875.60 Monthly Expense of UAL~ 100000016223316055.7100.502020 $ 5,070.53 Monthly Expense of UAL~ 100000016223316055.7200.502020 $ 584.04 Monthly Expense of UAL~ 100000016223316055.8000.502020 $ 8,972.99 Monthly Expense of UAL~ 100000016223316055.8100.502020 $ 23,096.15 Monthly Expense of UAL~ 100000016223316Printed: 12/3/2020 11:06:33AMPage 17 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.8400.502020 $ 929.16 Monthly Expense of UAL~ 100000016223316CALPERS000714 ‐ 055.9000.502020 $ 18,344.17 Monthly Expense of UAL~ 100000016223316011.9019.502020 $ 9,079.18 Monthly Expense of UAL~ 100000016223316055.9100.502020 $ 16,220.40 Monthly Expense of UAL~ 100000016223316055.9200.502020 $ 8,840.25 Monthly Expense of UAL~ 100000016223316011.1031.502020 $ 188,509.00 Monthly Expense of UAL~ 100000016223322011.1033.502020 $ 770.00 Monthly Expense of UAL~ 100000016223325011.1031.502020 $ 296.00 Monthly Expense of UAL~ 100000016223329011.1033.502020 $ 300,854.00 Monthly Expense of UAL~ 100000016223334011.1024.502020 $ 54.00 Monthly Expense of UAL~ 100000016223339$ 755,956.0011/25/2020 10548056.5600.520000 $ 549.39 Building Supplies ~ 091620_MULTIPLE 056.0000617HOME DEPOT CREDIT SERVICES001552 ‐ 055.9100.520000 $ 334.31 Hardware Supplies~ 092820_MULTIPLE 055.0002812055.8000.590000 $ 2,162.10 Small Tools, Plumbing & Hardware 092920_MULTIPLE 055.0002809055.8400.590000 $ 302.27 Small Tools, Plumbing & Hardware 092920_MULTIPLE 055.0002809011.1043.520000 $ 908.93 Small Tools & Plumbing Hardware~ 102920_MULTIPLE 011.0014456011.1048.520000 $ 5,570.96 Small Tools & Plumbing Hardware~ 102920_MULTIPLE 011.0014456011.1049.520000 $ 3,961.39 Small Tools & Plumbing Hardware~ 102920_MULTIPLE 011.0014456020.1084.520000 $ 128.88 Building Materials & Hardware~ 8360758 011.0014441$ 13,918.2311/25/2020 10549Printed: 12/3/2020 11:06:33AMPage 18 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1048.560000 $ 31.17 Period: 10/07/20 ‐ 11/06/20 111020THE GAS COMPANY001581 ‐ 011.1049.560000 $ 662.58 Period: 10/08/20 ‐ 11/09/20 111220011.1043.560000 $ 331.29 Period: 10/08/20 ‐ 11/09/20 111220020.1084.560000 $ 331.29 Period: 10/08/20 ‐ 11/09/20 111220011.1049.560000 $ 780.06 Period: 10/08/20 ‐ 11/09/20 111220(2)$ 2,136.3911/25/2020 10550011.1033.520000 $ 18.24 Period: 10/20 933312420(2)UPS001617 ‐ 011.1041.520000 $ 31.00 Period: 10/20 933312420(2)011.1033.520000 $ 18.06 Period: 10/20 933312430(2)055.8000.590000 $ 15.98 Period: 10/20 933312430(2)011.1041.520000 $ 46.06 Period: 10/20 933312430(2)011.1041.520000 $ 88.50 Period: 10/20 933312440(2)$ 217.8411/27/2020 10551TOTAL ELECTRONIC$ 8,952,303.19Printed: 12/3/2020 11:06:33AMPage 19 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1043.520000 $ 640.00 85 Gallon Steel Opentop Drum 57511 011.0014560AMBERWICK CORP005204 ‐ 011.1043.520000 $ 78.00 15 Gallon Steel Opentop Drum 57511 011.0014560011.1043.520000 $ 54.00 55 Gallon Steel Opentop Drum 57511 011.0014560011.1043.520000 $ 79.00 1.0 Cubic Yard Box 57511 011.0014560011.1043.520000 $ 159.00 Freight 57511 011.0014560011.1043.520000 $ 80.85 Sales Tax 9.5% 57511$ 1,090.8511/17/2020 606511011.9019.590110 $ 700.00 Fire StaƟon InspecƟon Database System 18020ANGEL CITY DATA, INC000314 ‐ $ 700.0011/17/2020 606512055.9200.560010 $ 308.60 Period: 09/19/20 ‐ 10/18/20 3121379947AT&T001948 ‐ $ 308.6011/17/2020 606513011.9019.560010 $ 46.23 Period: 09/09/20 ‐ 10/08/20 832176480X10162020AT&T MOBILITY002889 ‐ $ 46.2311/17/2020 606514011.9019.520010 $ 3,405.45 Door Maintenance 5095550BEARCOM006054 ‐ $ 3,405.4511/17/2020 606515011.1026.596200 $ 11,776.66 ArbitraƟon Costs~ 111220STEPHEN M. BIERSMITH006624 ‐ $ 11,776.6611/17/2020 606516011.1043.560000 $ 44.81 Period: 09/22/20 ‐ 10/21/20 102220CALIFORNIA WATER SERVICE CO000778 ‐ $ 44.8111/17/2020 606517Printed: 12/3/2020 11:06:33AMPage 20 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.520000 $ 1,161.50 Concrete 94813551CALPORTLAND COMPANY000256 ‐ $ 1,161.5011/17/2020 606518011.1048.596200 $ 71.05 Background Check 135429CLEAR INVESTIGATIVE ADVANTAGE,004787 ‐ $ 71.0511/17/2020 606519011.1026.596200 $ 8,793.56 Court Reporter Costs~ 111220COALITION COURT REPORTERS006952 ‐ $ 8,793.5611/17/2020 606520011.1049.520000 $ 1,702.38 Overhead Doors Maintenance 19099COMMERCIAL DOOR OF LOS ANGELES000331 ‐ $ 1,702.3811/17/2020 606521011.1049.520000 $ 196.20 Electrical Supplies & Hardware~ 264974 011.0014462CURRENT WHOLESALE ELECTRIC SUP001336 ‐ 011.1049.520000 $ 281.12 Electrical Supplies & Hardware~ 264976 011.0014462011.1049.520000 $ 43.00 Electrical Supplies & Hardware~ 264977 011.0014462011.1049.520000 $ 11.51 Electrical Supplies & Hardware~ 264978 011.0014462011.1049.520000 $ 893.03 Electrical Supplies & Hardware~ 265153 011.0014462011.1048.520000 $ 74.40 Electrical Supplies & Hardware~ 265154 011.0014462011.1043.520000 $ 253.58 Electrical Supplies & Hardware~ 265155 011.0014462011.1043.520000 $ 23.75 Electrical Supplies & Hardware~ 265156 011.0014462$ 1,776.5911/17/2020 606522Printed: 12/3/2020 11:06:33AMPage 21 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.900000 $ 12,575.00 EATON SPX250A0‐4A2N1~ 6530002 011.0014556ELECTRICAL SALES, INC006918 ‐ 020.1084.900000 $ 12,575.00 EATON SPX250A0‐4A2N1~ 6530002 011.0014556020.1084.900000 $ 495.00 EATON OPTCQ~ 6530002 011.0014556020.1084.900000 $ 495.00 EATON OPTCQ~ 6530002 011.0014556020.1084.900000 $ 209.69 Freight 6530002020.1084.900000 $ 209.69 Freight 6530002020.1084.900000 $ 1,261.57 Sales Tax 9.5% 6530002020.1084.900000 $ 1,261.57 Sales Tax 9.5% 6530002$ 29,082.5211/17/2020 606523Printed: 12/3/2020 11:06:33AMPage 22 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.120010 $ 856.00 Toilet Paper~ S4214044001 011.0014500EMPIRE CLEANING SUPPLY001936 ‐ 011.120010 $ 1,308.00 GP White MulƟfold Towel~ S4214044001 011.0014500011.120010 $ 68.64 Bleach Germicidal~ S4214044001 011.0014500011.120010 $ 80.40 Glass Cleaner~ S4214044001 011.0014500011.120010 $ 121.00 Disinfectant Spray~ S4214044001 011.0014500011.120010 $ 39.60 Urinal Screens~ S4214044001 011.0014500011.120010 $ 234.99 Sales Tax 9.5% S4214044001011.120010 $ 447.36 Hand Soap~ S4214044002 011.0014500011.120010 $ 42.50 Sales Tax 9.5% S4214044002011.120010 $ 65.76 Mango Eco Clip~ S4214044003 011.0014500011.120010 $ 6.25 Sales Tax 9.5% S4214044003011.120010 $ 11.00 Disinfectant Spray~ S4214044004 011.0014500011.120010 $ 1.05 Sales Tax 9.5% S4214044004$ 3,282.5511/17/2020 606524011.120010 $ 1,483.28 10" Gate Valve~ 735414 011.0014589FERGUSON WATERWORKS000524 ‐ 011.120010 $ 1,866.72 8" Gate Valve~ 735414 011.0014589011.120010 $ 318.25 Sales Tax 9.5% 735414$ 3,668.2511/17/2020 606525011.1070.550000 $ 350.00 General All Around Event Coverage~ 28 011.0014579BRIAN FIGUEROA005980 ‐ $ 350.0011/17/2020 606526Printed: 12/3/2020 11:06:33AMPage 23 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE055.8400.596200 $ 142.00 Disposal & Recycling Services 09X00250HAUL AWAY RUBBISH SERVICE CO,005350 ‐ 055.8400.596200 $ 780.60 Disposal & Recycling Services 09X00251$ 922.6011/17/2020 606527011.9019.590110 $ 64.00 SBF Abstract 21ASRE070LA COUNTY ASSESSOR OFFICE001792 ‐ $ 64.0011/17/2020 606528011.1049.590000 $ 210.00 Pool Maintenance 6195LA POOL GUYS005340 ‐ $ 210.0011/17/2020 606529011.1031.596500 $ 54.58 DUI Checkpoint ‐ Planning & Mgmt 102820RAFAEL LANDA003701 ‐ $ 54.5811/17/2020 606530011.9019.520010 $ 215.00 Time Tracking System 52366ONEPOINT HUMAN CAPITAL MGMT006475 ‐ $ 215.0011/17/2020 606531011.1031.596500 $ 54.58 DUI Checkpoint ‐ Planning & Mgmt 102820DANIEL ONOPA003248 ‐ $ 54.5811/17/2020 606532056.5600.900000 $ 3,264.00 3M175 Meter~ 102999 056.0000627PFT‐ALEXANDER, INC005762 ‐ 056.5600.900000 $ 334.56 Sales Tax 10.25 102999$ 3,598.5611/17/2020 606533011.1049.520000 $ 58.64 Plumbing Supplies & Building Hardware S1236733001PLUMBING & INDUSTRIAL SUPPLY001943 ‐ $ 58.6411/17/2020 606534Printed: 12/3/2020 11:06:33AMPage 24 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE055.8400.596200 $ 718.90 Janitorial Services 10/20~ 71910PRIORITY BUILDING SERVICES, LL006416 ‐ 055.8300.596200 $ 595.63 Janitorial Services 10/20~ 71910056.5600.596200 $ 821.45 Janitorial Services 10/20~ 71910$ 2,135.9811/17/2020 606535011.1046.590000 $ 692.00 Car Wash Services 275924QUALIFIED MOBILE, INC006612 ‐ $ 692.0011/17/2020 606536055.9000.900000 $ 322.50 Meteorological Services 2009SIMON WIND, INC005790 ‐ 055.9000.900000 $ 1,000.00 Meteorological Services 2010$ 1,322.5011/17/2020 606537011.1031.520000 $ 16.20 Laundry Services~ 11957 011.0014447STATE STREET LAUNDRY000191 ‐ 011.1031.520000 $ 7.20 Laundry Services~ 11960 011.0014447011.1031.520000 $ 8.10 Laundry Services~ 11961 011.0014447$ 31.5011/17/2020 606538011.1049.590000 $ 2,090.95 Remove & Replace ATS Mechanism & 20580SWEINHART ELECTRIC CO005556 ‐ 011.1049.590000 $ 294.52 Minor Service on EPS 21386$ 2,385.4711/17/2020 606539Printed: 12/3/2020 11:06:33AMPage 25 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1046.520000 $ 810.00 245/55R18 Good Year Eagle RSA 17052522 011.0014613TIREHUB, LLC006371 ‐ 011.1046.520000 $ 387.00 265/60R17 Good Year Eagle RSA 17052522 011.0014613011.1046.590000 $ 15.75 CA Tire Fee 17052522 011.0014613011.1046.520000 $ 113.73 Sales Tax 9.5% 17052522$ 1,326.4811/17/2020 606540011.9019.560010 $ 836.16 Period: 09/11/20 ‐ 10/10/20 9864608138VERIZON WIRELESS001481 ‐ $ 836.1611/17/2020 606541020.1084.500140 $ 330.00 Water Quality TesƟng & ReporƟng W0J1961COVERNONWECK LABORATORIES, INC001628 ‐ $ 330.0011/17/2020 606542011.1043.520000 $ 343.94 Regulatory Signs & MounƟng Hardware~ 90130011.0014470ZUMAR INDUSTRIES, INC001153 ‐ 011.1043.520000 $ 1,570.98 Regulatory Signs & MounƟng Hardware~ 90213 011.0014470$ 1,914.9211/17/2020 606543Printed: 12/3/2020 11:06:33AMPage 26 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE055.8100.596200 $ 84.95 Portable Restrooms 646982A THRONE CO, INC000005 ‐ 055.8100.596200 $ 88.95 Portable Restrooms 646984055.8100.596200 $ 216.49 Portable Restrooms 651514055.8100.596200 $ 122.43 Portable Restrooms 656154055.8100.596200 $ 122.43 Portable Restrooms 656156055.8100.596200 $ 122.43 Portable Restrooms 660858055.8100.596200 $ 279.14 Portable Restrooms 660859055.8100.596200 $ 122.43 Portable Restrooms 660860020.1084.520000 $ 84.95 Portable Restrooms 662686055.8100.596200 $ 122.43 Portable Restrooms 665379055.8100.596200 $ 279.14 Portable Restrooms 665380055.8100.596200 $ 122.43 Portable Restrooms 665381020.1084.520000 $ 84.95 Portable Restrooms 667344$ 1,853.1511/24/2020 606544011.1049.520000 $ 855.12 Office Grade Surge Strip~ 3117 011.0014605AMERICAN SAFETY PRODUCTS006934 ‐ 011.1049.520000 $ 87.65 Sales Tax 10.25 3117$ 942.7711/24/2020 606545011.1046.520000 $ 105.00 Reflash Computer 33831 011.0014612ANAYA SERVICE CENTER006308 ‐ $ 105.0011/24/2020 606546011.1031.594200 $ 2,960.38 Inmate Housing 10/20 19721CITY OF HUNTINGTON PARK003846 ‐ $ 2,960.3811/24/2020 606547Printed: 12/3/2020 11:06:33AMPage 27 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.500140 $ 719.00 Water Quality TesƟng & ReporƟng 977361CLINICAL LAB OF SAN BERNARDINO003088 ‐ $ 719.0011/24/2020 606548011.1049.520000 $ 4,079.92 Overhead Doors Maintenance 19103COMMERCIAL DOOR OF LOS ANGELES000331 ‐ $ 4,079.9211/24/2020 606549011.1048.590000 $ 60.00 Pest Control Services 13858103DEWEY PEST CONTROL002566 ‐ 011.1048.590000 $ 100.00 Pest Control Services 13858108011.1048.590000 $ 95.00 Pest Control Services 13858109011.1048.590000 $ 135.00 Pest Control Services 13858110011.1048.590000 $ 75.00 Pest Control Services 13858111011.1049.590000 $ 62.00 Pest Control Services 13858112011.1049.590000 $ 67.00 Pest Control Services 13858113011.1049.590000 $ 42.00 Pest Control Services 13858114$ 636.0011/24/2020 606550011.1026.596200 $ 52.00 Reimb. Live Scan 111220THO DO006954 ‐ $ 52.0011/24/2020 606551Printed: 12/3/2020 11:06:33AMPage 28 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1049.520000 $ 462.72 Respirator N95~ 96055 011.0014400EXTREME SAFETY, INC004730 ‐ 011.1049.520000 $ 43.96 Sales Tax 9.5% 96055011.120010 $ 367.50 N‐DEX 8‐mil Blue Nitrile~ 98500 011.0014350011.120010 $ 300.00 N‐DEX 8‐mil Blue Nitrile ~ 98500 011.0014350011.120010 $ 712.80 Nitrile Palm Gloves Large~ 98500 011.0014350011.120010 $ 131.13 Sales Tax 9.5% 98500$ 2,018.1111/24/2020 606552011.1048.596200 $ 67.50 Disposal & Recycling Services 0AX00260HAUL AWAY RUBBISH SERVICE CO,005350 ‐ 011.1049.596200 $ 213.00 Disposal & Recycling Services 0AX00261011.1033.520000 $ 135.00 Disposal & Recycling Services 0AX00262011.1033.520000 $ 135.00 Disposal & Recycling Services 0AX00263011.1033.520000 $ 135.00 Disposal & Recycling Services 0AX00264011.1033.520000 $ 67.50 Disposal & Recycling Services 0AX00265055.8400.596200 $ 142.00 Disposal & Recycling Services 0AX00266055.8400.596200 $ 610.95 Disposal & Recycling Services 0AX00267011.1043.596200 $ 1,010.20 Disposal & Recycling Services 0AX00268$ 2,516.1511/24/2020 606554011.1046.520000 $ 175.00 DifferenƟal Pressure Switch 1246 011.0014616HP DPF CLEANING006740 ‐ 011.1046.590000 $ 1,150.00 Labor to remove & install DPF Filter 1246 011.0014616011.1046.520000 $ 17.94 Sales Tax 10.25 1246$ 1,342.9411/24/2020 606555Printed: 12/3/2020 11:06:33AMPage 29 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1026.594200 $ 75.00 ParƟcipaƟon Fee 225914IGOE & COMPANY, INC000686 ‐ $ 75.0011/24/2020 606556011.1046.520000 $ 273.87 Oil Coolant, O‐Rings, Oil Filter, & Oil 2650 011.0014615IMPACT TIRE AUTO & TRUCK REPAI005560 ‐ 011.1046.590000 $ 325.00 Labor to replace oil cooler & clean 2650 011.0014615011.1046.520000 $ 28.07 Sales Tax 10.25 2650$ 626.9411/24/2020 606557Printed: 12/3/2020 11:06:33AMPage 30 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.900000 $ 455.40 WE01‐DTD01‐D W.E. Anderson WE01 Ball IN576198 011.0014549INSTRUMART006075 ‐ 020.1084.900000 $ 447.95 B110‐750‐1/2 BlanceƩ 1100 Turbine IN576198 011.0014549020.1084.900000 $ 374.00 B220‐873 BlanceƩ Intelligent IN576198 011.0014549020.1084.900000 $ 9.35 B220056 BlanceƩ B220056 Reducer IN576198 011.0014549020.1084.900000 $ 26.48 Freight IN576198 011.0014549020.1084.900000 $ 122.24 Sales Tax 9.5% IN576198020.1084.900000 $ 455.40 W.E. Anderson WE01 Ball Valves~ IN576208 011.0014550020.1084.900000 $ 447.95 BlanceƩ 1100 Turbine Flow Meter~ IN576208 011.0014550020.1084.900000 $ 374.00 BlanceƩ Intelligent Frequency IN576208 011.0014550020.1084.900000 $ 9.35 BlanceƩ B220056 Reducer Bushing~ IN576208 011.0014550020.1084.900000 $ 26.48 Freight IN576208 011.0014550020.1084.900000 $ 122.24 Sales Tax 9.5% IN576208020.1084.900000 $ 455.40 W.E. Anderson WE01 Ball Valves~ IN576209 011.0014551020.1084.900000 $ 447.95 BlanceƩ 1100 Turbine Flow Meter~ IN576209 011.0014551020.1084.900000 $ 374.00 BlanceƩ Intelligent Frequency Converter IN576209 011.0014551020.1084.900000 $ 9.35 BlanceƩ B220056 Reducer Bushing~ IN576209 011.0014551020.1084.900000 $ 26.48 Freight IN576209 011.0014551020.1084.900000 $ 122.24 Sales Tax 9.5% IN576209$ 4,306.2611/24/2020 606558011.1031.596200 $ 225.00 Pre‐Employment Polygraph Exam 202011006JOE MAR POLYGRAPH & INV SVC, I006399 ‐ $ 225.0011/24/2020 606559Printed: 12/3/2020 11:06:33AMPage 31 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1031.594200 $ 6.48 InterpretaƟon Services 4901358LANGUAGE LINE SERVICES, INC003272 ‐ $6.4811/24/2020 606560055.8000.900000 $ 5,750.00 Centron w/ 4G Modem~ 161761 055.0002774MCAVOY & MARKHAM ENGINEERING A000304 ‐ 055.8000.900000 $ 546.25 Sales Tax 9.5% 161761055.8000.900000 $ 11,500.00 Centron w/ 4G Modem~ 16335 055.0002788055.8000.900000 $ 1,092.50 Sales Tax 9.5% 16335055.8000.900000 $ 960.00 CENTRON, C1SDR3, CL200, 240V W:3, FM2S, 16453 055.0002831055.8000.900000 $ 7,728.00 CENTRONPOLY, CP1STR3, CL200, 120‐480V, 16453 055.0002831055.8000.900000 $ 825.36 Sales Tax 9.5% 16453$ 28,402.1111/24/2020 606561011.1031.596200 $ 35.82 TranscripƟon Services NT219NET TRANSCRIPTS, INC005272 ‐ $ 35.8211/24/2020 606562056.5600.595200 $ 889.20 Financial Support & Business 10374NEWGEN STRATEGIES & SOLUTIONS,006185 ‐ 056.5600.596200 $ 280.80 Financial Support & Business 10374$ 1,170.0011/24/2020 606563Printed: 12/3/2020 11:06:33AMPage 32 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1046.520000 $ 542.02 Def Sensor~ PC810899827 011.0014528QUINN COMPANY001457 ‐ 011.1046.590000 $ 10.64 Freight PC810899827 011.0014528011.1046.520000 $ 51.49 Sales Tax 9.5% PC810899827011.1046.590000 $ 1.01 Sales Tax 9.5% PC810899827011.1046.520000 $ 20.16 Hex Nut~ PC810900896 011.0014611011.1046.520000 $ 24.24 Wheel Stud~ PC810900896 011.0014611011.1046.520000 $ 72.72 Wheel Stud~ PC810900896 011.0014611011.1046.520000 $ 11.13 Sales Tax 9.5% PC810900896$ 733.4111/24/2020 606564011.120010 $ 1,656.00 (0560‐300) CoƩon Knit Rags ~ 226472IN 011.0014640SANDLER BROS000179 ‐ 011.120010 $ 157.32 Sales Tax 9.5% 226472IN$ 1,813.3211/24/2020 606565055.9100.596200 $ 717.11 OperaƟng Expense 10/20 20836SO CAL JOINT POLE COMMITTEE002079 ‐ $ 717.1111/24/2020 606566011.1031.596200 $ 200.00 Medical Services 521140532STACY MEDICAL CENTER000380 ‐ $ 200.0011/24/2020 606567056.5600.590000 $ 4,999.04 Repair Damaged Gear Box CVEC20033THE CAMPBELL VALVE & ENGINEERI004750 ‐ $ 4,999.0411/24/2020 606568Printed: 12/3/2020 11:06:33AMPage 33 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.596200 $ 120.55 New Ticket Charges 1020200792UNDERGROUND SERVICE ALERT000449 ‐ 055.8300.596200 $ 120.55 New Ticket Charges 920200789055.8300.596200 $ 65.43 CA State Fee for Regulatory Costs DSB20195660020.1084.596200 $ 65.43 CA State Fee for Regulatory Costs DSB20196293$ 371.9611/24/2020 606569011.120010 $ 99.18 (2990‐501) Acribond Flat White ‐ D Base 202071192300 011.0014639VISTA PAINT CORPORATION005480 ‐ 011.120010 $ 99.18 (2990‐502) Acribond Flat White ‐ A Base 202071192300 011.0014639011.120010 $ 181.92 (2991‐500) Coverall Ext Flat White ‐ P 202071192300 011.0014639011.120010 $ 60.64 (2991‐501) Coverall Ext Flat White ‐ D 202071192300 011.0014639011.120010 $ 60.64 (2991‐502) Coverall Ext Flat White ‐A 202071192300 011.0014639011.120010 $ 716.60 (2995‐500) Coverall Ext Flat White ‐ P 202071192300 011.0014639011.120010 $ 358.30 (2995‐501) Coverall Ext Flat White ‐ D 202071192300 011.0014639011.120010 $ 358.30 (2995‐502) Coverall Ext Flat White ‐ A 202071192300 011.0014639011.120010 $ 358.30 (2997‐300) Coverall Flat White ‐ P Base 202071192300 011.0014639011.120010 $ 67.60 Paint Care RECYCLE FEE 202071192300 011.0014639011.120010 $ 241.97 Sales Tax 10.25 202071192300$ 2,602.6311/24/2020 606570020.1084.500140 $ 180.00 Water Quality TesƟng & ReporƟng W0K0275COVERNONWECK LABORATORIES, INC001628 ‐ $ 180.0011/24/2020 606571TOTAL EARLY CHECKS$ 147,104.47Printed: 12/3/2020 11:06:33AMPage 34 of 35
CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020RECAP BY FUNDFUNDELECTRONIC TOTALEARLY CHECK TOTALWARRANT TOTALGRAND TOTALS$ 815,494.56$ 880,265.19$0.00$ 64,770.63011 ‐ GENERAL466,586.23502,721.390.0036,135.16020 ‐ WATER7,656,034.337,691,643.960.0035,609.63055 ‐ LIGHT & POWER13,152.7323,741.780.0010,589.05056 ‐ NATURAL GAS1,035.341,035.340.000.00057 ‐ FIBER OPTICGRAND TOTAL$9,099,407.66$0.00$147,104.47$8,952,303.19TOTAL CHECKS TO BE PRINTED 0Printed: 12/3/2020 11:06:33AMPage 35 of 35
City Council Agenda Item Report
Agenda Item No. COV-427-2020
Submitted by: Adriana Ramos
Submitting Department: Fire Department
Meeting Date: December 15, 2020
SUBJECT
Fire Department Activity Report
Recommendation:
Receive and file the September 2020 Report.
Background:
Attached is a copy of the Vernon Fire Department Activity Report which covers the period of September
1 through September 30, 2020. This report covers hours for Fire Prevention, Training, Pre-Incident,
Periodic Testing, Public Service Programs, Routine Maintenance, and an incident summary sheet
provided by LA County Fire (which is consistent with the new format). It is important to note that due to the
COVID-19 pandemic resulting in the temporary closure of non-essential businesses and in adherence to
the Los Angeles County Health Officer's Orders and guidelines for social distancing to minimize
COVID-19 exposure, Fire inspections ceased during the months of April and May, impacting the
year-to-date figures in the activity report. The Fire Department resumed inspections effective June 1,
2020.
Fiscal Impact:
There is no fiscal impact associated with this report.
Attachments:
1. Fire Department Activity Report - 09/01/20 to 09/30/20
ACTIVITY TYPE This Period Last Year This This Year
FIRE PREVENTION:Last Year To Date Period To Date
Regular Inspections (#): 143 1096 0 117
Re-Inspections (#): 8 156 0 4
Spec. Haz. Inspections (#): 4 27 0 5
Total Inspections: 155 1279 0 126
Total Staff Hours: 231 1859 0 191
PRE-INCIDENT (HOURS):
This Period Last Year This This Year
Last Year To Date Period To Date
Planning 204.5 1691.5 192 1647
District Familiarization 210.5 1686.5 180 1627
Total Hours: 415 3378 372 3274
PERIODIC TEST (HOURS):
This Period Last Year This This Year
Last Year To Date Period To Date
Hose Testing 0 4 0 14
Pump Testing 3 24 16 77
Total Hours: 3 28 16 91
VERNON FIRE DEPARTMENT
COMPANY ACTIVITIES
September 1, 2020 to September 30, 2020
*Reduction in activity due to transitioning to electronic inspection reporting system.
0
200
400
600
800
1000
1200
1400
Last Year To Date Period To Date
This Period Last Year This This Year
Annual Business Fire Inspections
Page 1
TRAINING (HOURS):
This Period Last Year This This Year
Last Year To Date Period To Date
Firefighting 238 2166 245 2360
Hazardous Materials 66 613 68 707
Safety 232 2197 214 2091
Apparatus Operations 251 2278 254 1318
Equipment Operations 251 2278 259 2205
CPR 12 84 4 132
First Aid 101 726 129 1109
Total Hours: 1151 10342 1173 9922
PUBLIC SERVICE PROGRAMS (HOURS):
This Period Last Year This This Year
Last Year To Date Period To Date
School Programs 8 36 0 6
Fire Brigades 0 16 0 12
Emergency Preparedness 41.5 245.5 49 416
Total Hours: 49.5 297.5 49 434
ROUTINE MAINTENANCE (HOURS):
This Period Last Year This This Year
Last Year To Date Period To Date
Station 251 2253 257 2257
Apparatus 258 2244 260 2281
Equipment 256 2278 264 2325
Total Hours: 765 6775 781 6863
Personnel Activity Total By Hours: 2614.5 22679.5 2391 20775
245
68
214
254
259
4
129
1173
Fire Training Hours
Firefighting
Hazardous Materials
Safety
Apparatus Operations
Equipment Operations
CPR
First Aid
Page 2
Los Angeles County Fire Department
CSL - Report City Details
Alarm Date
Time
Basic Incident Number
(FD1)
Cad Initial Cad Incident Type
Description
Incident Type Commercial/
Residential
Basic First Arrived At Scene
Apparatus ID
09/01/20 LAC20263869 LAW Commercial BC13
09/02/20 LAC20264278 INJA 321 - EMS call, excluding vehicle
accident with injury
Commercial S164
09/04/20 LAC20266540 STRC 100 - Fire, other Commercial E165
09/15/20 LAC20278925 SICKA 321 - EMS call, excluding vehicle
accident with injury
Residential S163
09/16/20 LAC20280153 GRS 143 - Grass fire Commercial E163
09/17/20 LAC20281361 EMS Commercial S164
09/17/20 LAC20281558 TCT 600 - Good intent call, other Commercial S163
09/17/20 LAC20281625 STRC Commercial BC13
09/25/20 LAC20290014 GASI Commercial BC13
09/25/20 LAC20290295 ALRWF Commercial E7579
City Council Agenda Item Report
Agenda Item No. COV-417-2020
Submitted by: Gregory Garcia
Submitting Department: Police Department
Meeting Date: December 15, 2020
SUBJECT
Police Department Activity Report
Recommendation:
Receive and file the October 2020 Report.
Background:
The Vernon Police Department's activity report consists of activity during the specified reporting period,
including a summary of calls for service, and statistical information regarding arrests, traffic collisions,
stored and impounded vehicles, recovered stolen vehicles, the number of citations issued, and the
number of reports filed.
Fiscal Impact:
There is no fiscal impact associated with this report.
Attachments:
1. Police Department Activity Report – October 2020
Type
VERNON POLICE DEPARTMENT
Department Activity Report
Jurisdiction:
First Date:
Last Date:
10/01/2020
10/31/2020
Department All Units Primary Unit
VERNON
Description
Complaint
VPD
10-6 OFFICER IS 10-6 C7,961,962,10-10, WASH, EQUIPM 231 224
10-96C 10-96 CHARLES (CITY HALL SECURITY CHECK)9 9
10-96H PICK UP THE JAIL PAPER WORK FROM HP JAIL 3 3
140 SUPPLEMENTAL REPORT 5 4
166R COURT ORDER VIOLATION REPORT 7 5
20001 INJURY HIT AND RUN 5 2
20001R INJURY HIT AND RUN REPORT 9 2
20002 NON-INJURY HIT AND RUN 13 6
20002R NON-INJURY HIT AND RUN REPORT 18 11
211 ROBBERY 3 1
211R ROBBERY REPORT 7 4
211S SILENT ROBBERY ALARM 5 1
242 BATTERY 3 2
242R BATTERY REPORT 3 2
314 INDECENT EXPOSURE 3 1
415 DISTURBING THE PEACE 51 16
422R TERRORIST THREATS REPORT 3 2
451R ARSON REPORT 4 2
459 BURGLARY 6 2
459A AUDIBLE BURGLARY ALARM 263 131
459R BURGLARY REPORT 16 10
459S SILENT BURGLARY ALARM 11 5
459V BURGLARY TO A VEHICLE 5 2
459VR BURGLARY TO A VEHICLE REPORT 10 6
476R FRAUD REPORT 1 1
484 PETTY THEFT 21 6
484R PETTY THEFT REPORT 21 15
487R GRAND THEFT REPORT 36 19
5150 SUBJECT WITH MENTAL DISABILITIES 5 1
586 PARKING PROBLEM 60 50
586E PARKING ENFORCEMENT 4 3
594 VANDALISM 28 9
594R VANDALISM REPORT 29 19
602 TRESPASS 71 33
602R TRESPASS REPORT 1 1
647F DRUNK IN PUBLIC 4 1
901 UNKNOWN INJURY TRAFFIC COLLISION 13 4
901T INJURY TRAFFIC COLLISION 28 7
901TR INJURY TRAFFIC COLLISION REPORT 3 1
902T NON-INJURY TRAFFIC COLLISION 108 59
902TR NON-INJURY TRAFFIC COLLISION REPORT 3 2
909E TRAFFIC ENFORCEMENT 8 4
909T TRAFFIC HAZARD 12 10
911 911 MISUSE / HANGUP 3 2
911A CONTACT THE REPORTING PARTY 23 16
911NR 911 CALL NO RESPONSE REQUIRED 2 1
917A ABANDONED VEHICLE 6 3
1Page of 311/03/2020 06:42:13
Type
VERNON POLICE DEPARTMENT
Department Activity Report
Jurisdiction:
First Date:
Last Date:
10/01/2020
10/31/2020
Department All Units Primary Unit
VERNON
Description
Complaint
VPD
925 SUSPICIOUS CIRCUMSTANCES 106 41
927 UNKNOWN TROUBLE 10 3
A459R ATTEMPT BURGLARY REPORT 5 1
A459VR ATTEMPT BURGLARY TO A VEHICLE REPORT 1 1
A487R ATTEMPT GRAND THEFT REPORT 3 1
ASSISTFD ASSIST FIRE DEPARTMENT 30 11
BOSIG BROKEN SIGNAL OR LIGHT 4 2
BOVEH BROKEN DOWN VEHICLE 16 13
CIVIL CIVIL MATTER 6 5
CODE5 SURVEILLANCE/STAKE-OUT 5 1
COP COP DETAIL 10 8
DEMOSTRA DEMONSTRATION 25 19
DET DETECTIVE INVESTIGATION 59 30
DETAIL DETAIL 3 3
DPTAST DEPARTMENTAL ASSIST 2 1
FILING OFFICER IS 10-6 REPORT WRITING 162 156
FOUND FOUND PROPERTY REPORT 2 2
FU FOLLOW UP 23 19
GTA GRAND THEFT AUTO 4 1
GTAR GRAND THEFT AUTO REPORT 32 24
HBC HAILED BY A CITIZEN 10 6
ID THEFT RPT IDENTITY THEFT REPORT 2 2
ILLDPG RPT ILLEGAL DUMPING REPORT 2 1
KTP KEEP THE PEACE 3 1
LOCATE LOCATED VERNON STOLEN VEHICLE / PLATES VI 4 4
LOJACK LOJACK HIT 5 5
LPR LICENSE PLATE READER 7 4
MISPLOCATE LOCATED MISSING PERSON REPORT 4 2
PANIC ALARM PANIC ALARM/DURESS ALARM 3 1
PAPD PUBLIC ASSIST-POLICE 24 13
PATCK PATROL CHECK 338 238
PEDCK PEDESTRIAN CHECK 76 37
PLATE LOST OR STOLEN PLATES REPORT 1 1
PRSTRAN PRISONER TRANSPORTED 2 2
REC RECOVERED STOLEN VEHICLE IN THE FIELD 43 19
RECKLESS DR RECKLESS DRIVING (23103)16 8
REPO REPOSSESSION 4 4
RR RAIL ROAD PROBLEM 1 1
SEAACA SEAACA ANIMAL CALLS 2 1
SHOTS SHOTS 6 1
SPEED SPEED CONTEST OR SPEEDING (23109)4 2
SRMET SRMET DETAIL 19 15
TRAFFIC STOP TRAFFIC STOP 166 90
UNATTACHED UNATTACHED TRAILER 2 2
VCK VEHICLE CHECK 161 107
VEH RELEASE VEHICLE RELEASE 3 3
VMCVIO VERNON MUNICIPAL CODE VIOLATION 1 1
2Page of 311/03/2020 06:42:13
Type
VERNON POLICE DEPARTMENT
Department Activity Report
Jurisdiction:
First Date:
Last Date:
10/01/2020
10/31/2020
Department All Units Primary Unit
VERNON
Description
Complaint
VPD
WARRANT WARRANT ARREST 4 2
WELCK WELFARE CHECK 32 15
Department: 2636 1650
Overall: 2636 1650
3Page of 311/03/2020 06:42:13
VERNON POLICE DEPARTMENT
Police Activity Report
Period Ending: 10/31/20
TRAFFIC COLLISIONS NO. PROPERTY RECOVERED
TOTAL 44 VEHICLES: $47,000.00
NON-INJURY 32
INJURY 12
Persons Injured 18
Pedestrian 1
Fatalities 0
City Property Damage 6
Hit & Run (Felony) 1
Hit & Run (Misdemeanor) 10
VEHICLES STORED PROPERTY RECOVERED FOR
Unlicensed Driver/Impounded Vehicle 7 OTHER DEPARTMENTS
Unattached Trailer 2 VEHICLES: $149,000.00
Abandoned/Stored Vehicle 8
Traffic Hazard 0
CITATIONS
Citations Iss (Prisoner Release) 71
Citations Iss (Other Violations) 0
Parking 88
Hazardous 12
Non-Hazardous 12
Citations Iss (Moving) 24
Citations Iss (Total) 112
CASES CLEARED BY ARREST
AR20-337 CR20-1668 594(B)(1) PC AR20-361 CR20-1815 594.2(A) PC
AR20-338 CR20-1679 11364(A) HS AR20-362 CR20-1816 10851(A) VC
AR20-339 CR20-1681 459 PC AR20-363 CR20-1818 381(B) PC
AR20-340 CR20-1691 459 PC
AR20-341 CR20-1706 11352 HS
AR20-343 CR20-1707 459 PC
AR20-346 CR20-1718 10851(A) VC
AR20-347 CR20-1720 10851(A) VC
AR20-348 CR20-1738 11364(A) HS
AR20-351 CR20-1744 10851(A) HS
AR20-352 CR20-1748 487(A) PC
AR20-354 CR20-1759 602(M) PC
AR20-357 CR20-1789 484(A) PC
AR20-359 CR20-1808 166(A)4 PC
AR20-360 CR20-1810 602 PC
MALE FEMALE TOTAL
BURGLARY (& ATTEMPTED)5 5
CARRY CONCEALED DIRK OR DAGGER 0
CRIMINAL THREATS 0
DOMESTIC VIOLENCE 0
GRAND THEFT: AUTO (& ATTEMPTED)314
GRAND THEFT: PROPERTY (& ATTEMPTED)22
TRANSPORT/SELL NARCOTICS 2 2
WARRANT (VERNON CASE)0
WARRANT (OUTSIDE AGENCY)0
TOTAL FELONY ARRESTS 12 1 13
MALE FEMALE TOTAL
COURT ORDER VIOLATION 1 1
CONTRIBUTE TO DELINQUENCY OF A MINOR 0
DRIVING W/SUSPENDED LICENSE 0
DRIVING UNDER THE INFLUENCE 1 1
PETTY THEFT 1 1
POSSESSION OF NARCOTICS 0
POSSESSION OF NITROUS OXIDE 1 1
POSSESSION OF PARAPHERNALIA 1 1 2
PUBLIC NUISANCE 0
RESISTING ARREST 0
TRESPASSING 4 4
VANDALISM 2 2
WARRANT (VERNON CASE) 3 3
WARRANT (OUTSIDE AGENCY)0
TOTAL MISD. ARRESTS 13 2 15
MALE FEMALE TOTAL
BURGLARY 0
CARRY LOADED FIREARM IN PUBLIC 0
ROBBERY 0
VANDALISM 0
WARRANT 0
TOTAL JUVENILES DET. 0 0 0
121
237
4
362
VERNON POLICE DEPARTMENT
REPORT FOR PERSONS ARRESTED
ADULT FELONY ARRESTS AND DISPOSITIONS
PERIOD ENDING: 10/31/2020
ADULT MISDEMEANOR ARRESTS AND DISPOSITIONS
JUVENILES DETAINED --- FELONY AND MISDEMEANOR
TOTAL FELONY ARRESTS (ADULT) TO DATE:
TOTAL MISDEMEANOR ARRESTS (ADULT) TO DATE:
TOTAL JUVENILES DETAINED (FELONY AND MISDEMEANOR) TO DATE:
TOTAL ARRESTS AND DETAINED JUVENILES (FELONY AND MISDEMEANOR) TO DATE:
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/01/202010/01/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010178965025 E SLAUSON AV, VERNONA487RSSS INVESTMENT06:42:5210/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201656 CA0197300VPDSALDANA,CARLOS*32E06:45:33 06:46:0406:48:32VPDNEWTON,TODD31E07:48:0708:37:5907:50:18VPDSWINFORD,PHILLIP4107:25:2507:41:51202010179033055 FRUITLAND AV, VERNON594RPOPULAR 2109:40:1810/01/2020RPTNRDDepartmentOCA NumberRMS JurisVPD CR20201657 CA0197300VPDNEWTON,TODD*31E10:07:16 10:07:1711:56:0210:16:27202010179043737 S SOTO, VERNON415MCDONALDS09:57:5110/01/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201658 CA0197300VPDCERDA,PAUL,JR*32W09:59:4311:51:0310:05:52VPDNEWTON,TODD31E10:58:2010:49:54VPDSWINFORD,PHILLIP4110:00:4611:25:3310:05:49VPDENCINAS,ANTHONY5D3110:49:5910:03:35VPDMARTINEZ,GABRIELS509:59:45 10:11:1610:57:5210:49:51202010179074501 DOWNEY RD, VERNON211RGEE GEE LIQUOR11:00:3110/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201659 CA0197300VPDMARTINEZ,GABRIEL*S511:40:3511:25:31VPDSWINFORD,PHILLIP4112:04:5611:43:27202010179222600 E 28TH, VERNON5150FEDEX19:20:3510/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201661 CA0197300VPD*4019:22:2920:27:5019:26:43VPD31E19:22:4823:18:0319:26:52VPD32W19:23:4619:25:12VPD41W19:25:1520:46:5419:26:451Page of 210/02/202004:31:45
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/01/202010/01/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010179222600 E 28TH, VERNON5150FEDEX19:20:3510/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201661 CA0197300VPDLANDA,RAFAELXS21:16:2519:34:21* Denotes Primary Unit2Page of 210/02/202004:31:45
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/02/202010/02/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201017952S SOTO // 46TH, VERNON902T10:59:5210/02/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201662 CA0197300VPDCERDA,EUGENIO*40W11:41:1610:59:52202010179562601 S SOTO, VERNON594RJOE K S RESTAURANT11:55:2710/02/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201663 CA0197300VPDCERDA,EUGENIO*40W12:05:47 12:06:2212:49:1412:06:23202010179673651 SIERRA PINE AV, VERNONRECGABRIEL MORALES15:38:5110/02/2020RPTVRECDepartmentOCA NumberRMS JurisVPD CR20201665 CA0197300VPDNEWTON,TODD*3215:41:4415:43:18VPDCERDA,PAUL,JR41E15:43:1716:44:24202010179684820 E 50TH, VERNONREPOBON APPETIT15:43:5210/02/2020RPTREPODepartmentOCA NumberRMS JurisVPD CR20201664 CA0197300VPDRECORDS BUREAU*RECD16:13:0115:44:44202010179922011 E 49TH, VERNON415GORILLA AUTO PRODUCTS22:20:3510/02/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201666 CA0197300VPDMADRIGAL,ALFONSO*40W22:22:06 22:22:1023:01:5022:24:09VPDGODOY,RAYMOND3122:22:07 22:22:1123:01:5022:23:40VPDMANNINO,NICHOLAS32E23:01:5022:23:14VPDCROSS,JEREMYS423:01:5122:23:22* Denotes Primary Unit1Page of 110/03/202005:08:15
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/03/202010/03/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010180022100 E 38TH, VERNONTRAFFIC STOP00:09:0210/03/20201015VIRPTDepartmentOCA NumberRMS JurisVPD CR20201667 CA0197300VPDMADRIGAL,ALFONSO*40W01:56:1400:09:02VPDGODOY,RAYMOND3101:56:16 02:54:4700:09:04VPDCAM,PATRICK41E00:31:3202:19:2800:33:39VPDREDONA,BRYAN43W01:56:2201:37:07VPDCROSS,JEREMYS400:10:03 00:10:0301:56:2300:31:28202010180113737 S SOTO, VERNON594MCDONALD`S RESTAURANTS03:14:5910/03/20201015CITERPTDepartmentOCA NumberRMS JurisVPD CR20201668 CA0197300VPDMANNINO,NICHOLAS*32E03:16:28 03:16:3104:14:3703:21:43VPDGODOY,RAYMOND3103:52:2803:22:08VPDMADRIGAL,ALFONSO40W03:16:29 03:16:3204:14:3703:19:11VPDREDONA,BRYAN43W04:14:3803:25:07VPDCROSS,JEREMYS404:14:3803:18:52202010180175993 MALBURG WY, VERNON S/A `484RTULLY WIHR07:06:4210/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201669 CA0197300VPDFLORES,TERESA*38E07:21:4808:25:1107:28:37202010180223851 S SOTO, VERNON594RCONCENTRA09:42:2510/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201670 CA0197300VPDDOCHERTY,MICHAEL*4309:44:53 09:45:3810:21:3709:52:40202010180414423 BANDINI BL, VERNON594RDOLLAR EMPIRE16:47:2410/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201672 CA0197300VPDFLORES,TERESA*38E16:57:41 16:58:0317:12:361Page of 310/04/202005:10:00
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/03/202010/03/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010180414423 BANDINI BL, VERNON594RDOLLAR EMPIRE16:47:2410/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201672 CA0197300VPDDOCHERTY,MICHAEL43W17:32:23 17:32:2418:14:5017:37:07VPDONOPA,DANIELS717:32:1617:32:1920201018042E 37TH // SOTO, VERNON901TANTONIO17:05:4010/03/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201671 CA0197300VPDNEWTON,TODD*32W17:06:38 17:07:0318:00:5117:11:50VPDFLORES,TERESA38E18:09:5317:12:43VPDCERDA,EUGENIO40E17:08:4818:09:5317:09:16VPDONOPA,DANIELS717:31:0117:08:4220201018045BANDINI BL // ATLANTIC BL, VERNON901TLASO18:12:4510/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201673 CA0197300VPDCERDA,EUGENIO*40E18:13:40 18:14:0919:07:4018:22:21VPDLUCAS,JASON2219:07:3419:02:19VPD32E18:45:5919:07:3518:53:51VPDFLORES,TERESA38E18:15:0319:07:3718:21:19VPDCAM,PATRICK41W18:47:2119:07:4118:51:34VPDDOCHERTY,MICHAEL43W18:15:0619:13:0118:16:36202010180462000 E 25TH, VERNON459V18:32:3310/03/2020VSDepartmentOCA NumberRMS JurisVPD CR20201674 CA0197300VPDNEWTON,TODD*32W19:05:3418:32:3320201018054E VERNON AV // SOTO ST, VERNONTRAFFIC STOP21:12:0610/03/2020CITEVSRPTDepartmentOCA NumberRMS JurisVPD CR20201675 CA0197300VPDCAM,PATRICK*41W21:50:3521:12:072Page of 310/04/202005:10:00
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/03/202010/03/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018054E VERNON AV // SOTO ST, VERNONTRAFFIC STOP21:12:0610/03/2020CITEVSRPTDepartmentOCA NumberRMS JurisVPD CR20201675 CA0197300VPDMADRIGAL,ALFONSO32E21:43:1421:13:09VPDREDONA,BRYAN43W21:12:10 21:12:1021:49:1821:13:15202010180552011 E 49TH, VERNONPATCKGORILLA AUTO PRODUCTS21:42:5410/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201676 CA0197300VPDMANNINO,NICHOLAS*40E21:43:09 21:43:1122:27:1421:48:47VPDLUCAS,JASON2221:43:10 21:43:1322:27:1321:49:26VPDMADRIGAL,ALFONSO32E21:43:1622:27:1321:45:33VPDCAM,PATRICK41W21:50:3822:27:1421:53:12VPDREDONA,BRYAN43W21:49:2222:27:1421:51:35* Denotes Primary Unit3Page of 310/04/202005:10:00
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/04/202010/04/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010180682501 E 27TH, VERNON594INERMODA02:00:3710/04/20201015RPTDepartmentOCA NumberRMS JurisVPD CR20201679 CA0197300VPDMANNINO,NICHOLAS*40E02:04:40 02:04:4004:14:0502:25:31VPDCAM,PATRICK41W03:09:5902:17:31VPDREDONA,BRYAN43W02:05:0303:09:3202:14:36VPDCROSS,JEREMYS402:32:0502:16:51202010180712011 E 49TH, VERNON902TGORILLA AUTO PRODUCTS02:07:1610/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201677 CA0197300VPDMADRIGAL,ALFONSO*32E02:33:3502:08:38VPDLUCAS,JASON2202:33:5202:28:1620201018073S ALAMEDA // 55TH, VERNON20002RLAPD #29102:12:2010/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201678 CA0197300VPDMADRIGAL,ALFONSO*32E02:34:0503:18:02 03:21:5302:34:09VPDLUCAS,JASON2202:34:0603:21:5202:34:07202010180922241 E 49TH, VERNON487RUNK11:46:5010/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201680 CA0197300VPDFINO,MARCUS*31W11:50:15 11:50:1613:16:5312:19:08202010181014310 MAYWOOD AV, VERNON459VRUNK15:14:1310/04/20201015RPTDepartmentOCA NumberRMS JurisVPD CR20201681 CA0197300VPDFLORES,TERESA*38E15:15:29 15:15:3017:21:2515:18:04VPDVILLEGAS,RICHARD4115:16:1117:08:2315:18:03VPDDOCHERTY,MICHAEL4317:21:2515:17:24202010181021Page of 210/05/202005:13:54
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/04/202010/04/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010181023049 E VERNON AV, VERNON242RFARMER JOHN16:33:1310/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201682 CA0197300VPDFINO,MARCUS*31W17:32:2316:38:32* Denotes Primary Unit2Page of 210/05/202005:13:54
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/05/202010/05/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010181322011 E 49TH, VERNONPATCKGORILLA AUTO PRODUCTS01:01:0210/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201683 CA0197300VPDCROSS,JEREMY*s403:55:2601:01:02VPDLUCAS,JASON2201:01:07 01:01:1003:18:1701:17:11VPDSALDANA,CARLOS32E01:01:05 01:01:0903:54:3401:07:24VPDCAM,PATRICK41W01:03:1503:18:1901:04:22VPDREDONA,BRYAN4303:54:3601:23:50202010181492263 E VERNON AV, VERNON459RREFORMATION07:04:2310/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201684 CA0197300VPDFLORES,TERESA*38W07:06:54 07:06:5507:57:4707:07:2120201018151S ATLANTIC BL // DISTRICT BL, VERNON902T08:24:2710/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201685 CA0197300VPDZOZAYA,OSCAR*40E09:54:2408:24:27VPDVALENZUELA,FERNANDO32E08:50:5408:42:20202010181543375 E SLAUSON AV, VERNONA459RWALTERS WHOLESALE ELECTRIC08:40:2610/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201688 CA0197300VPDVILLEGAS,RICHARD*4308:42:48 08:43:3309:41:5808:46:19VPDFINO,MARCUS31W08:42:49 08:43:3409:35:1508:46:47VPDVALENZUELA,FERNANDO32E08:50:5410:20:2808:54:33VPDFLORES,TERESA38W08:52:1309:35:1909:03:49VPDCHAVEZ,JERRY,JRS109:05:1109:37:4809:12:45202010181566200 MALBURG WY, VERNON594RLBA REALTY08:45:5610/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201686 CA0197300VPDFINO,MARCUS*31W09:35:1509:57:2009:37:43VPDFLORES,TERESA38W09:35:19 09:35:2009:43:0909:38:201Page of 310/06/202004:22:20
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/05/202010/05/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010181572425 E 30TH, VERNON487REVERLY09:31:1210/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201687 CA0197300VPDVILLEGAS,RICHARD*4309:41:5910:09:43 11:00:5809:50:04VPDFLORES,TERESA38W09:43:0910:07:1709:57:24VPDCHAVEZ,JERRY,JRS109:42:0010:02:2809:57:28202010181602425 E 30TH, VERNON487R11:01:2510/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201689 CA0197300VPDVILLEGAS,RICHARD*4311:11:4611:01:25202010181704423 E DISTRICT BL, VERNON459RA PLUS VEGETABLES12:49:3510/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201690 CA0197300VPDVALENZUELA,FERNANDO*32E12:52:19 12:52:1913:34:2113:00:16202010181833828 S SANTA FE AV, VERNON459VLUMI15:34:0210/05/20201015RPTDepartmentOCA NumberRMS JurisVPD CR20201691 CA0197300VPDFINO,MARCUS*31W15:35:5219:04:5115:36:35VPDVALENZUELA,FERNANDO32E15:37:2115:46:5115:38:25VPDFLORES,TERESA38W15:36:1716:23:3215:46:11VPDVILLEGAS,RICHARD4315:35:5516:23:3515:39:37202010181932328 E VERNON AV, VERNONID THEFT RPTVICTORIA DEAPEAU17:59:3710/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201692 CA0197300VPDVALENZUELA,FERNANDO*32E18:04:5418:54:5218:08:39202010182074151 BANDINI BL, VERNONVCK21:28:1410/05/2020DARPTDepartmentOCA NumberRMS JurisVPD CR20201693 CA01973002Page of 310/06/202004:22:20
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/05/202010/05/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010182074151 BANDINI BL, VERNONVCK21:28:1410/05/2020DARPTDepartmentOCA NumberRMS JurisVPD CR20201693 CA0197300VPDARANA,ANDRE*40W21:55:0421:28:14VPDSALDANA,CARLOS32E21:55:0421:28:17* Denotes Primary Unit3Page of 310/06/202004:22:20
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/06/202010/06/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010182362322 E 51ST, VERNON487RBARGAIN BANK08:32:1510/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201694 CA0197300VPDFINO,MARCUS*31W08:41:22 08:41:3509:05:0308:44:40202010182432110 E 51ST, VERNON925CALPLASTICS11:03:5510/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201695 CA0197300VPDVALENZUELA,FERNANDO*32E11:04:49 11:05:2411:49:3111:12:28VPDFINO,MARCUS31W11:05:3412:35:1211:08:27VPDZOZAYA,OSCAR41E11:05:5611:59:0011:15:49202010182444927 ALCOA AV, VERNON459RFLAMINGO CONSTRUCTION11:16:5310/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201696 CA0197300VPDVILLEGAS,RICHARD*43W12:59:1611:28:48202010182535151 ALCOA AV, VERNONGTARROSE AND SHORE13:41:2610/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201697 CA0197300VPDVALENZUELA,FERNANDO*32E13:44:1214:23:4913:47:31202010182602465 FRUITLAND AV, VERNON211RWANG GLOBAL NET15:41:4610/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201698 CA0197300VPDVALENZUELA,FERNANDO*32E15:43:2716:36:3415:47:15VPDFINO,MARCUS31W15:55:3615:44:03* Denotes Primary Unit1Page of 110/07/202003:45:33
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/07/202010/07/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010182854305 S SANTA FE AV, VERNON48400:13:3910/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201699CA0197300VPDESTRADA,IGNACIO*S302:06:3000:15:47VPDVASQUEZ,LUIS1STOF02:06:3001:05:05VPDLANDA,RAFAEL4300:16:3100:27:4900:16:51VPDSANTOS,DANIELS200:27:4000:16:50202010183102955 E VERNON AV, VERNON594RCALIFORNIA ALUMINUM09:12:3810/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201700CA0197300VPDSWINFORD,PHILLIP*43W09:30:1310:36:2409:41:10202010183184489 BANDINI BL, VERNON484RBAKERY DEPOT11:32:3610/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201701CA0197300VPDVALENZUELA,FERNANDO*32E11:33:41 11:35:3912:16:4411:46:43202010183274825 E DISTRICT BL, VERNONGTARSKY DENTAL13:33:4410/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201702CA0197300VPDSTEVENSON,KENT,JR*31E13:36:29 13:36:5613:37:21VPDVALENZUELA,FERNANDO32E14:39:4213:37:19202010183344767 E 49TH, VERNONA459VR16:22:3710/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201703CA0197300VPDVALENZUELA,FERNANDO*32E17:19:5916:22:3720201018336E SLAUSON AV // ALCOA AV, VERNON902TT-MOBILE USA16:26:3810/07/2020RPTORDepartmentOCA NumberRMS JurisVPDCR20201704CA0197300VPDSTEVENSON,KENT,JR*31E16:28:4017:20:2316:34:20VPDCERDA,PAUL,JR41W16:29:0717:52:3416:30:581Page of 110/08/202000:16:04
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/08/202010/08/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010183734310 MAYWOOD AV, VERNON459VRUNK07:27:4610/08/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201705 CA0197300VPDNEWTON,TODD*31E07:32:35 07:33:3508:15:1007:41:5320201018386GRAND // CALIFORNIA, VERNONTRAFFIC STOP12:37:5910/08/2020RPT1015VIDepartmentOCA NumberRMS JurisVPD CR20201706 CA0197300VPDSTEVENSON,KENT,JR*32E15:47:2812:37:59VPDCERDA,EUGENIO40W12:38:2714:09:3412:47:51VPDSWINFORD,PHILLIP4313:01:05 13:01:1614:09:31202010183922618 FRUITLAND AV, VERNON45914:44:3810/08/2020RPT1015DepartmentOCA NumberRMS JurisVPD CR20201707 CA0197300VPDCERDA,PAUL,JR*41W14:45:33 14:48:1516:40:1414:49:27VPDNEWTON,TODD31E14:45:38 14:48:1616:50:4814:49:25VPDCERDA,EUGENIO40W17:13:0815:08:5520201018394E 55TH // ALAMEDA, VERNON901TT-Mobile USA 888-662-4662 opt 416:55:2110/08/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201708 CA0197300VPDCERDA,PAUL,JR*41W16:55:46 16:55:5817:58:3517:16:05VPDNEWTON,TODD31E17:44:1717:06:08VPDSWINFORD,PHILLIP4316:56:3117:41:0717:01:04202010183974515 BANDINI BL, VERNONGTARGTS17:42:5110/08/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201709 CA0197300VPDNEWTON,TODD*31E17:44:20 17:45:0018:50:1817:58:19202010184021Page of 210/09/202001:05:06
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/08/202010/08/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018402E 46TH // SOTO, VERNONREC19:27:0910/08/2020VRECVSDepartmentOCA NumberRMS JurisVPDCR20201710CA0197300VPDMADRIGAL,ALFONSO*32W20:10:4819:27:09VPDGODOY,RAYMOND38W19:28:3820:08:3219:30:17202010184054305 S SANTA FE AV, VERNON166R20:23:5810/08/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201711CA0197300VPDMANNINO,NICHOLAS*31E20:24:5221:37:3820:29:36* Denotes Primary Unit2Page of 210/09/202001:05:06
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/09/202010/09/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018414SEVILLE AV // FRUITLAND AV, VERNONREC02:33:5710/09/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201712 CA0197300VPDMANNINO,NICHOLAS*31E02:34:3702:33:57VPDMADRIGAL,ALFONSO32W03:27:3402:34:36VPDGODOY,RAYMOND38W02:35:3803:27:3502:42:34202010184295335 S DISTRICT BL, VERNON487RCAL SDM08:26:1010/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201713 CA0197300VPDDOCHERTY,MICHAEL*43E08:27:39 08:42:5508:28:16 09:07:07202010184303340 LEONIS BL, VERNON20002RLUCKY BRAND JEANS08:46:5110/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201714 CA0197300VPDCERDA,PAUL,JR*4108:49:21 08:49:5408:51:18VPDNEWTON,TODD31W08:54:3509:18:3508:59:03202010184432939 S SUNOL DR, VERNON20002RGREENLAND FOODS12:50:0710/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201715 CA0197300VPDDOCHERTY,MICHAEL*43E12:53:50 12:54:1613:41:0813:05:21VPDCERDA,PAUL,JR4113:21:2613:21:33202010184464305 S SANTA FE AV, VERNON14013:49:3910/09/2020SUPVPDDOCHERTY,MICHAEL*43E13:49:39 13:54:2614:32:4013:54:2720201018457ALAMO AV // 52D PL, VERNONPATCK20:50:3510/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201716 CA0197300VPDMADRIGAL,ALFONSO*41E21:41:3220:50:35VPDGODOY,RAYMOND38E20:58:5221:41:3220:59:241Page of 210/10/202005:25:40
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/09/202010/09/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018465AYERS AV // 26TH, VERNONVCK22:34:5410/09/2020RPTFIDepartmentOCA NumberRMS JurisVPDCR20201717CA0197300VPDMADRIGAL,ALFONSO*41e23:22:5922:34:55VPDGODOY,RAYMOND38E22:35:3323:22:5922:38:57* Denotes Primary Unit2Page of 210/10/202005:25:40
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/10/202010/10/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018470ALCOA AV // LEONIS BL, VERNONREC00:02:3110/10/20201015VRECRPTCITEDepartmentOCA NumberRMS JurisVPDCR20201718CA0197300VPDMADRIGAL,ALFONSO*41E00:04:21 00:04:2203:13:4700:06:04VPDGODOY,RAYMOND38E02:07:0800:06:14VPDMANNINO,NICHOLAS40W03:13:4700:13:26VPDCAM,PATRICK43W03:13:4700:08:43202010184845837 S DISTRICT BL, VERNON902T08:09:5610/10/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201719CA0197300VPDCERDA,EUGENIO*3208:41:4808:10:03VPDFLORES,TERESA38E08:37:2408:15:36202010184943390 E SLAUSON AV, VERNONVCK12:37:1210/10/2020VRECRPT1015DepartmentOCA NumberRMS JurisVPDCR20201720CA0197300VPDFLORES,TERESA*38E14:48:3412:37:12VPDCERDA,EUGENIO3212:39:2013:43:5712:43:02VPDDOCHERTY,MICHAEL43W12:38:36 12:38:3613:44:1712:43:03VPDPEREZ,NICKL213:44:1612:43:04202010184985051 E DISTRICT BL, VERNONGTAR17:54:3410/10/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201721CA0197300VPDFLORES,TERESA*38E17:59:42 17:59:4218:05:4418:05:05VPDCERDA,EUGENIO3219:38:3918:05:42* Denotes Primary Unit1Page of 110/11/202006:36:53
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/11/202010/11/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010185133480 E 26TH, VERNON902TM TEXTILE03:28:0310/11/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201722CA0197300VPDGODOY,RAYMOND*38E03:30:32 03:30:3304:12:24 05:55:0903:39:25VPDCAM,PATRICK4303:50:45 03:50:4604:56:1703:56:57202010185163278 E SLAUSON AV, VERNON925AMPM04:50:3410/11/2020VSRPTDepartmentOCA NumberRMS JurisVPDCR20201723CA0197300VPDMADRIGAL,ALFONSO*41W04:52:46 04:52:4706:37:4004:56:12VPDGODOY,RAYMOND38E06:29:4605:57:43VPDCAM,PATRICK4304:56:2306:55:1105:01:10VPDCROSS,JEREMYS404:53:22 04:53:3004:56:3420201018532GRANDE VISTA AV // WASHINGTON BL, VERNONREC16:07:3410/11/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201724CA0197300VPDFINO,MARCUS*32W17:04:0916:07:34* Denotes Primary Unit1Page of 110/12/202004:52:57
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/12/202010/12/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010185772288 E 27TH, VERNON902TR06:33:3910/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201725 CA0197300VPDCAM,PATRICK*43W07:14:1506:33:39VPDSALDANA,CARLOS31E06:33:4307:13:3506:37:20202010185812800 E 50TH, VERNONGTARAMERICAN INTEGRATED SERVICES07:39:1410/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201727 CA0197300VPDFINO,MARCUS*32E07:40:30 07:40:3115:15:0707:51:2720201018583E 44TH // BOYLE AV, VERNON901TT-Mobile USA, Inc.07:51:4010/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201726 CA0197300VPDVILLEGAS,RICHARD*XS07:52:2808:14:1007:54:04VPDFLORES,TERESA38W07:54:5008:21:0507:57:29VPDZOZAYA,OSCAR4008:21:0507:56:48202010185882465 FRUITLAND AV, VERNON487RWANG GLOBAL NET09:52:2710/12/2020RPTRPTDepartmentOCA NumberRMS JurisVPD CR20201730 CA0197300VPD CR20201731 CA0197300VPDFLORES,TERESA*38W10:13:05 10:13:0611:23:2110:16:3820201018589SOTO//VERNON, VERNON211RNURSE VERONICA10:00:5910/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201729 CA0197300VPDFINO,MARCUS*32E10:09:18 10:09:1911:20:1510:14:15202010185904890 S ALAMEDA, VERNON459RW & W CONCEPTS10:14:3010/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201732 CA0197300VPDZOZAYA,OSCAR*4010:15:53 10:15:5310:21:11VPDFINO,MARCUS32E11:21:14 11:21:1412:01:3311:31:571Page of 310/13/202004:45:23
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/12/202010/12/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018591LEONIS BL // ALCOA AV, VERNON902TWALTER10:17:0110/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201728 CA0197300VPDPEREZ,NICK*L210:21:0010:21:03VPDZOZAYA,OSCAR4010:21:1211:20:5810:25:05202010185942770 LEONIS BL, VERNON S/A 100GTARBEALS.4.U11:32:2410/12/2020RPTVRECDepartmentOCA NumberRMS JurisVPD CR20201733 CA0197300VPDZOZAYA,OSCAR*4011:48:3312:40:3711:58:08202010185984341 E DISTRICT BL, VERNONGTAREPIC TEXTILES13:19:1710/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201734 CA0197300VPDFINO,MARCUS*32E13:20:49 13:20:4914:51:5813:27:49202010186065203 DOWNEY RD, VERNON459VRWEST PICO DISTRIBUTOR15:23:5410/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201735 CA0197300VPDZOZAYA,OSCAR*4015:27:23 15:27:2617:00:4015:49:43202010186092801 LEONIS BL, VERNONSRMETLA VILLA GRILL16:22:4610/12/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201736 CA0197300VPDFINO,MARCUS*32E16:24:47 16:25:0619:11:0316:28:03VPDFLORES,TERESA38W16:24:49 16:25:0817:34:5216:29:13VPDZOZAYA,OSCAR4018:14:5317:00:42202010186245981 MALBURG WY, VERNONVCK20:22:4310/12/2020VSDepartmentOCA NumberRMS JurisVPD CR20201737 CA0197300VPDSALDANA,CARLOS*20E21:13:5120:22:432Page of 310/13/202004:45:23
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/12/202010/12/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010186252916 S SANTA FE AV, VERNONVCK20:40:0310/12/20201015CITERPTDepartmentOCA NumberRMS JurisVPDCR20201738CA0197300VPDARANA,ANDRE*31W21:12:1720:40:03VPDLUCAS,JASON4120:41:2721:12:17VPDCAM,PATRICK4320:40:54 20:40:5521:12:1720:43:18* Denotes Primary Unit3Page of 310/13/202004:45:23
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/13/202010/13/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010186345383 ALCOA AV, VERNONGTART TILE00:16:2710/13/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201739 CA0197300VPDARANA,ANDRE*31W00:20:13 00:20:1301:21:1700:24:09VPDSALDANA,CARLOS20E00:36:0401:21:1700:38:44202010186572618 FRUITLAND AV, VERNON459RVACANT BUILDING08:47:3410/13/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201740 CA0197300VPDVILLEGAS,RICHARD*4309:21:1810:01:0709:25:40202010186632465 FRUITLAND AV, VERNON140WANG GLOBAL NET10:46:4910/13/2020SUPVPDVILLEGAS,RICHARD*4311:07:44 11:07:5511:08:58VPDVALENZUELA,FERNANDO32E11:08:5611:19:1211:13:08202010186725608 S SOTO, VERNON459R13:22:4710/13/2020VOIDDepartmentOCA NumberRMS JurisVPD CR20201741 CA0197300VPDRECORDS BUREAU*recd14:57:2613:34:37VPDFINO,MARCUS31W14:10:5214:10:59202010186753500 E WASHINGTON BL, VERNON92514:52:2610/13/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201742 CA0197300VPDVALENZUELA,FERNANDO*32E14:52:46 14:54:2116:04:2514:59:20VPDFINO,MARCUS31W14:53:00 14:54:2316:04:2515:00:48VPDVILLEGAS,RICHARD4314:54:3816:04:2515:00:46VPDZOZAYA,OSCARMET116:04:2615:24:17202010186774305 S SANTA FE AV, VERNONWARRANT16:14:2010/13/2020RPT10151Page of 210/14/202001:52:15
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/13/202010/13/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010186774305 S SANTA FE AV, VERNONWARRANT16:14:2010/13/2020RPT1015VPDHERNANDEZ,EDWARD*5D3216:54:4616:14:20VPDESCOBEDO,ALEXY5D3316:54:4716:20:01202010186924310 MAYWOOD AV, VERNON487RJOSE MONTOYA20:48:4110/13/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201743CA0197300VPDARANA,ANDRE*31E20:52:39 20:55:1221:24:1020:57:52* Denotes Primary Unit2Page of 210/14/202001:52:15
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/14/202010/14/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187085526 S SOTO, VERNONPEDCK02:34:5310/14/20201015RPTVPDSALDANA,CARLOS*20W04:29:0702:34:54VPDARANA,ANDRE31E03:09:3802:35:0120201018716S SOTO // 26TH, VERNONREC06:55:2110/14/2020VREC1015RPTDepartmentOCA NumberRMS JurisVPD CR20201744 CA0197300VPDCHAVEZ,JERRY,JR*S107:39:5006:57:36VPDSTEVENSON,KENT,JR22W06:59:2407:04:19VPDCERDA,PAUL,JR32E09:09:1907:55:26VPDARANA,ANDRE40E06:57:5707:21:5007:03:59VPDMADRIGAL,ALFONSO41W06:59:3108:04:0007:04:00202010187184333 MAYWOOD AV, VERNONRECFRESH PACKING07:15:0310/14/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201745 CA0197300VPDZOZAYA,OSCAR*40E07:21:5407:58:5307:26:3020201018720E 26TH // MINERVA, VERNONFOUNDELI ZEPEDA07:20:1410/14/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201747 CA0197300VPDSWINFORD,PHILLIP*31W08:28:2609:40:5008:35:1320201018722E 46TH // SOTO, VERNON901TRERIC07:57:2810/14/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201746 CA0197300VPDZOZAYA,OSCAR*40E07:58:45 07:59:1308:33:3408:01:47VPDFINO,MARCUS31W08:24:2608:04:12VPDCHAVEZ,JERRY,JRS108:01:5608:22:4608:03:20202010187241Page of 310/15/202003:45:25
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/14/202010/14/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187243333 DOWNEY RD, VERNON487RUPS09:09:4610/14/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201748 CA0197300VPDSTEVENSON,KENT,JR*22W09:59:4109:23:42202010187383333 DOWNEY RD, VERNONDET11:28:3510/14/20201015VSRPTVPDHERRERA,GUSTAVO*5D3022:28:5700:23:2511:28:35VPDREYNA,JOSE S5D2322:28:5723:12:16 22:28:0511:38:39VPDENCINAS,ANTHONY5D3122:28:5700:23:2611:38:37VPDHERNANDEZ,EDWARD5D3222:28:5800:23:2611:38:38VPDESCOBEDO,ALEXY5D3322:28:5800:23:2611:38:38VPDVELEZ,MARISSA5D3422:28:0711:38:39202010187513482 E 26TH, VERNON901TJULIO SERMAN16:31:0810/14/2020RPTORVSDepartmentOCA NumberRMS JurisVPD CR20201749 CA0197300VPDZOZAYA,OSCAR*40E16:31:34 16:32:2117:43:2016:34:37VPDSTEVENSON,KENT,JR22W17:39:5116:38:08VPDSWINFORD,PHILLIP31W16:32:5117:19:5616:35:18VPDCERDA,PAUL,JR32E16:39:3117:02:2316:41:54VPDCHAVEZ,JERRY,JRS117:08:2916:39:38202010187554901 BANDINI BL, VERNON602PREFERRED FREEZER18:07:3110/14/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201750 CA0197300VPDCERDA,PAUL,JR*32E18:08:49 18:09:0519:18:4818:17:34VPDSTEVENSON,KENT,JR22W19:08:5518:18:30VPDARANA,ANDRE31E18:58:2120:30:3119:05:47VPDSWINFORD,PHILLIP31W18:08:50 18:09:0618:58:1318:21:21VPDGODOY,RAYMOND38W19:09:4619:07:462Page of 310/15/202003:45:25
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/14/202010/14/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187554901 BANDINI BL, VERNON602PREFERRED FREEZER18:07:3110/14/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201750CA0197300VPDARANA,ANDRE40E19:07:2719:05:53* Denotes Primary Unit3Page of 310/15/202003:45:25
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/15/202010/15/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187804199 BANDINI BL, VERNONPLATEJose Aguilar00:25:1610/15/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201751 CA0197300VPDGODOY,RAYMOND*38W00:26:29 00:26:3001:05:0700:36:29202010187853220 E 26TH, VERNON594RSEVEN UP01:27:0510/15/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201752 CA0197300VPDARANA,ANDRE*31E01:41:33 01:41:3302:33:0601:47:052020101879548TH // SANTA FE, VERNONVCK07:46:3010/15/2020VSRPTDepartmentOCA NumberRMS JurisVPD CR20201753 CA0197300VPDNEWTON,TODD*32W08:41:1207:46:30202010187972820 LEONIS BL, VERNON902TMAYLAND08:12:4110/15/2020RPTCITYDepartmentOCA NumberRMS JurisVPD CR20201754 CA0197300VPDSWINFORD,PHILLIP*40E08:14:09 08:14:5408:57:3608:14:55202010187991875 E 27TH, VERNONREC08:51:5010/15/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201755 CA0197300VPDCERDA,PAUL,JR*43W08:55:41 08:56:4809:59:3608:59:43VPDSWINFORD,PHILLIP40E08:57:3709:48:0409:02:42202010188003300 BANDINI BL, VERNONGTARSILK & DOLLAR10:00:1810/15/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201756 CA0197300VPDSTEVENSON,KENT,JR*22E10:03:42 10:04:0311:19:2810:09:33202010188073883 S SOTO, VERNONRECFARMER JOHN12:46:1610/15/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201757 CA01973001Page of 210/16/202004:13:08
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/15/202010/15/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010188073883 S SOTO, VERNONRECFARMER JOHN12:46:1610/15/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201757CA0197300VPDNEWTON,TODD*32W12:51:22 12:51:5013:46:2113:19:02VPDSTEVENSON,KENT,JR22E12:53:0113:43:5712:58:0520201018812PACIFIC // FRUITLAND AV AVE., VERNON20001ATLAY15:03:0510/15/2020RPTVIORDepartmentOCA NumberRMS JurisVPDCR20201758CA0197300VPDNEWTON,TODD*32W15:04:45 15:05:1215:45:2815:07:38VPDSTEVENSON,KENT,JR22E15:44:5715:23:52VPDSWINFORD,PHILLIP40E15:44:5415:07:54202010188254305 S SANTA FE AV, VERNON10-96C19:35:4110/15/20201015VPDESTRADA,IGNACIO*S319:56:1719:35:41* Denotes Primary Unit2Page of 210/16/202004:13:08
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/16/202010/16/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010188514280 MAYWOOD AV, VERNONPEDCK01:24:1410/16/20201015RPTDepartmentOCA NumberRMS JurisVPDCR20201759CA0197300VPDMADRIGAL,ALFONSO*40E03:18:5001:24:14VPDMANNINO,NICHOLAS20W01:26:1403:39:3901:27:28VPDGODOY,RAYMOND38E01:24:3203:57:1401:27:22VPDLANDA,RAFAEL43W01:25:2703:39:4801:30:30VPDESTRADA,IGNACIOS303:18:5501:24:18202010188763226 E 44TH, VERNONREPOMOLA INC14:46:4610/16/2020RPTREPODepartmentOCA NumberRMS JurisVPDCR20201760CA0197300VPDRECORDS BUREAU*RECD15:27:3214:48:48202010188774300 E DISTRICT BL, VERNON459RCLASSIC SLIPCOVERS15:19:3510/16/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201761CA0197300VPDDOCHERTY,MICHAEL*43E15:22:01 15:22:3416:10:5215:32:54* Denotes Primary Unit1Page of 110/18/202005:53:02
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/17/202010/17/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010189043341 E 50TH, VERNONGTARMARTIN01:55:5010/17/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201762 CA0197300VPDMANNINO,NICHOLAS*38E01:59:11 02:00:0403:42:4302:02:35VPDGODOY,RAYMOND3202:03:5102:06:17 03:42:4302:07:4120201018915FRUITLAND AV // PACIFIC BL, VERNON415ANTONIO06:29:2410/17/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201763 CA0197300VPDMANNINO,NICHOLAS*38E06:32:0307:53:3106:34:31VPDFLORES,TERESA31E07:35:5208:39:2407:40:01VPDGODOY,RAYMOND3207:55:3806:34:29VPDNEWTON,TODD32W08:39:2506:50:34VPDMADRIGAL,ALFONSO40W07:58:3506:50:51VPDCAM,PATRICK4306:32:0607:47:1006:34:33VPDONOPA,DANIELS707:55:0107:11:15202010189213121 FRUITLAND AV, VERNONGTARJAVIER SHOP REPAIR08:00:4510/17/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201764 CA0197300VPDCERDA,EUGENIO*40E08:02:43 08:03:1309:07:1808:10:3820201018925ATLANTIC // DISTRICT, VERNON20002REZEQUIEL RIVERA09:54:1310/17/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201765 CA0197300VPDCERDA,EUGENIO*40E09:59:46 10:00:0510:52:0310:38:59VPDFLORES,TERESA31E10:47:0010:23:4420201018926E 37TH // SANTA FE AV, VERNON451R10:39:2510/17/2020RPTVIDepartmentOCA NumberRMS JurisVPD CR20201766 CA0197300VPDNEWTON,TODD*32W10:40:38 10:40:3912:07:4810:43:04VPDDOCHERTY,MICHAEL43W10:41:0211:29:231Page of 210/18/202005:51:38
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/17/202010/17/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018936S ALAMEDA // 25TH, VERNON901T16:32:3310/17/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201767CA0197300VPDDOCHERTY,MICHAEL*43W17:10:3516:32:33VPDCERDA,EUGENIO40E16:34:39 16:35:0917:10:3516:43:37202010189392011 E 49TH, VERNON415FEC STUDIOS17:37:0010/17/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201768CA0197300VPDNEWTON,TODD*32W17:38:02 17:38:2718:57:0817:40:24VPDMADRIGAL,ALFONSO2018:45:4818:48:4518:47:15VPD20W19:52:2718:47:45VPDFLORES,TERESA31E17:38:3018:55:5517:41:45VPDGODOY,RAYMOND3818:46:3818:48:21VPDMANNINO,NICHOLAS38E19:56:0118:47:56VPDMANNINO,NICHOLAS4019:56:0119:52:24VPDCERDA,EUGENIO40E17:38:3218:59:2217:41:48VPDDOCHERTY,MICHAEL43W19:56:0218:24:17VPDMANNINO,NICHOLAS4418:45:0818:55:4818:46:20VPDCROSS,JEREMYS419:56:0218:47:59VPDONOPA,DANIELS717:40:3819:53:0817:41:56* Denotes Primary Unit2Page of 210/18/202005:51:38
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/18/202010/18/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010189955502 ALCOA AV, VERNONREC13:07:3410/18/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201770CA0197300VPDFLORES,TERESA*38E13:46:1513:07:34VPDDOCHERTY,MICHAEL3113:07:3613:33:5813:11:1720201018996E 55TH // ALAMEDA, VERNON20002R13:34:1310/18/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201771CA0197300VPDDOCHERTY,MICHAEL*3114:05:0313:34:13202010190114309 FRUITLAND AV, VERNONGTARGENERAL MILLS19:05:1310/18/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201772CA0197300VPDCAM,PATRICK*3119:07:32 19:07:3319:14:36 20:10:4119:35:04VPDARANA,ANDRE26E19:43:59 19:43:5919:44:10* Denotes Primary Unit1Page of 110/19/202002:07:50
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/19/202010/19/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010190303463 E 26TH, VERNON902TNOE/UPS01:27:5810/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201773 CA0197300VPDSALDANA,CARLOS*38W01:29:49 01:30:1602:03:1601:33:29VPDCAM,PATRICK3101:29:50 01:30:1802:48:4201:33:40VPDCROSS,JEREMYS401:32:3202:48:4320201019046FRUITLAND AV // DOWNEY RD, VERNONVCK07:25:1410/19/2020VSRPTDepartmentOCA NumberRMS JurisVPD CR20201774 CA0197300VPDZOZAYA,OSCAR*4008:02:0507:25:20202010190533801 S SANTA FE AV, VERNON459RTHREE ANGELS SCREEN PRINTING08:23:3510/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201775 CA0197300VPDRAMOS,JOSE*1STOF08:36:2308:29:23VPDFLORES,TERESA38W08:35:4609:48:5108:41:49202010190755524 ALCOA AV, VERNON487RSTYLES ON DEMAND15:01:3910/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201776 CA0197300VPDFLORES,TERESA*38W15:03:16 15:03:1615:03:37VPDFINO,MARCUS31E15:03:30 15:03:3115:38:2315:08:35202010190852764 LEONIS BL, VERNON902TRHOME EXTRAS INC16:18:0010/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201777 CA0197300VPDFINO,MARCUS*31E16:20:0517:22:1416:28:04202010190862330 E 57TH, VERNONGTARJETRO CASH AND CARRY16:21:0510/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201778 CA0197300VPDFLORES,TERESA*38W16:31:09 16:31:0917:34:3616:49:561Page of 210/20/202001:09:09
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/19/202010/19/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019090E WASHINGTON BL // DOWNEY RD, VERNONREC17:46:3710/19/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201779CA0197300VPDZOZAYA,OSCAR*4018:10:0817:46:37VPDFLORES,TERESA38W17:54:0717:54:2520201019091E 55TH // SANTA FE AV, VERNON902TMIRIAM GONZALEZ17:53:0710/19/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201780CA0197300VPDFLORES,TERESA*38W17:54:2719:05:3618:00:24VPDZOZAYA,OSCAR4018:11:1618:25:0118:13:36202010191012223 INDIANA AVE, LOS ANGELESLOCATEABSOLUTE TOWING20:10:1210/19/2020VRECVPDRECORDS BUREAU*RECD21:19:1220:11:26* Denotes Primary Unit2Page of 210/20/202001:09:09
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/202010/20/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010191412099 E 27TH, VERNONGTARFOOD CASTLE08:58:3310/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201781 CA0197300VPDVALENZUELA,FERNANDO*32W09:37:3609:42:47 11:09:1009:45:45202010191462528 S SANTA FE AV, VERNONILLDPG RPTUNK10:46:5910/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201782 CA0197300VPDVILLEGAS,RICHARD*4010:53:31 10:54:0011:00:41 12:01:1311:01:05VPDFINO,MARCUS38E10:58:5212:01:1311:04:3120201019158E DISTRICT BL // LOMA VISTA AV, VERNONPEDCK13:31:3010/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201783 CA0197300VPDVILLEGAS,RICHARD*4014:39:3513:31:30VPDZOZAYA,OSCARMET113:31:5614:55:0513:44:20202010191602678 E 26TH, VERNON594RCOMMERCIAL SANDBLAST13:37:5010/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201785 CA0197300VPDVALENZUELA,FERNANDO*32W13:58:5014:00:57 14:39:2114:10:25202010191613275 E VERNON AV, VERNON917A13:54:1710/20/2020VIDepartmentOCA NumberRMS JurisVPD CR20201784 CA0197300VPDFINO,MARCUS*38E13:58:1914:01:02 14:36:3814:02:53USTOWUS TOW14:09:10 14:10:4814:36:3814:29:35202010191642929 LEONIS BL, VERNON211RBEST ORIENTAL PRODUCE14:48:3410/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201786 CA0197300VPDFINO,MARCUS*38E14:53:4117:04:0614:55:11VPDVELEZ,MARISSA5D3415:31:5215:26:041Page of 311/03/202006:51:24
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/202010/20/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene2020101917055TH // BANDERA, VERNONLOCATELAPD NEWTON16:24:3410/20/2020VREC202010191725527 S DISTRICT BL, VERNON902TUNK16:58:3110/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201787 CA0197300VPDVILLEGAS,RICHARD*4017:00:5118:10:3117:09:03VPDARANA,ANDRE32W17:11:0017:20:40VPDFINO,MARCUS38E17:04:1118:10:3117:13:39MR C TOWMR C TO17:34:09 17:34:2518:10:3217:56:56202010191745200 SAN GABRIEL PL, PICO RIVERALOCATELASO PICO17:54:5410/20/2020VREC20201019176S DISTRICT BL // ATLANTIC BL, VERNON902TPAM18:18:5710/20/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201788 CA0197300VPDFINO,MARCUS*38E18:19:1818:53:3018:20:21VPDSALDANA,CARLOS20E18:46:30 18:46:3118:51:46VPDVILLEGAS,RICHARD4019:09:3418:21:48USTOWUS TOW18:33:18 18:33:4719:09:3518:53:35202010191804305 S SANTA FE AV, VERNON48418:49:3410/20/2020RPT1015DepartmentOCA NumberRMS JurisVPD CR20201789 CA0197300VPDARANA,ANDRE*26W19:51:3018:50:05VPDSALDANA,CARLOS20E19:35:4119:13:15VPDSALDANA,CARLOS20W18:50:5519:13:1118:51:41VPDFINO,MARCUS38E18:54:0319:01:51VPDLANDA,RAFAEL4319:32:5218:51:552Page of 311/03/202006:51:24
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/202010/20/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010191904265 CHARTER AV, VERNONREC22:56:2410/20/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201790CA0197300VPDSALDANA,CARLOS*20E23:42:5522:56:25MR C TOWMR C TO23:10:05 23:11:2923:42:5623:16:07* Denotes Primary Unit3Page of 311/03/202006:51:24
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/21/202010/21/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019193S SOTO // VERNON AV, VERNON20002OSCAR PEREZ00:00:1310/21/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201791 CA0197300VPDARANA,ANDRE*26W00:01:24 00:01:2500:29:1300:02:51VPDSALDANA,CARLOS20E00:01:3300:13:1200:02:57VPDLANDA,RAFAEL4300:29:1300:05:2320201019210E 25TH // ALAMEDA, VERNONREC07:42:0810/21/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201792 CA0197300VPDSWINFORD,PHILLIP*4307:56:3709:18:4708:02:18202010192133094 E VERNON AV, VERNONREPO10:07:0410/21/2020REPODepartmentOCA NumberRMS JurisVPD CR20201793 CA0197300VPDRECORDS BUREAU*RECD10:58:4310:09:13202010192155500 S BOYLE AV, VERNON487RSTYLE MELODY INC10:16:1610/21/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201794 CA0197300VPDCERDA,PAUL,JR*40E10:25:24 10:27:2111:31:5610:57:04VPDVALENZUELA,FERNANDO32W10:54:0511:13:1310:56:52VPDSWINFORD,PHILLIP4310:53:4610:54:08202010192244305 S SANTA FE AV, VERNON166R12:31:2010/21/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201795 CA0197300VPDRECORDS BUREAU*RECD14:18:4713:14:36202010192293700 E 26TH, VERNON902TUNK14:42:5910/21/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201796 CA0197300VPDCERDA,PAUL,JR*40E14:44:45 14:44:5515:57:4414:51:37VPDVALENZUELA,FERNANDO32W15:03:4415:57:4415:11:101Page of 210/22/202004:46:29
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/21/202010/21/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010192293700 E 26TH, VERNON902TUNK14:42:5910/21/2020RPTORDepartmentOCA NumberRMS JurisVPDCR20201796CA0197300VPDZOZAYA,OSCAR3815:03:3415:03:46202010192322600 E 28TH, VERNONFOUNDFEDEX16:08:3410/21/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201797CA0197300VPDVALENZUELA,FERNANDO*32W16:11:4517:29:0316:23:14* Denotes Primary Unit2Page of 210/22/202004:46:29
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/22/202010/22/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010192655050 S SANTA FE AV, VERNON594RROGERS POULTRY03:37:5810/22/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201798 CA0197300VPDSALDANA,CARLOS*31W03:41:00 03:41:4104:30:2003:45:13VPDARANA,ANDRE26E04:23:3903:45:35202010192668800 WHITTER BLVD, PICO RIVERALOCATEMR C`S03:47:2010/22/2020VRECVPDRECORDS BUREAU*RECD04:26:5504:22:3920201019270111th // LORRIANE, LYNWOODLOCATEKRUGER TOW05:20:5010/22/2020VRECVPDRECORDS BUREAU*RECD05:30:4505:22:0720201019276E 50TH // BOYLE AV, VERNONVCK08:19:3510/22/2020VSVIRPTDepartmentOCA NumberRMS JurisVPD CR20201799 CA0197300VPDCERDA,PAUL,JR*32E10:02:2408:19:35VPDCERDA,EUGENIO31E11:27:0008:29:19202010192854305 S SANTA FE AV, VERNON166RVERNON POLICE DEPARTMENT12:12:5810/22/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201800 CA0197300VPDSWINFORD,PHILLIP*43W12:15:08 12:16:5412:18:55VPDREDONA,BRYAN2STOF13:09:3712:18:53202010192899500 ETIWANDA, RANCHO CUCAMONGAWARRANT14:16:1710/22/20201015VPDVELEZ,MARISSA*5D3415:49:1714:16:17VPDENCINAS,ANTHONY5D3115:49:1714:16:211Page of 210/23/202006:02:51
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/22/202010/22/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010192944950 S SANTA FE AV, VERNON484RCRYSTAL ART GALLERY15:39:5410/22/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201801CA0197300VPDREDONA,BRYAN*2STOF15:42:5416:12:1815:49:20* Denotes Primary Unit2Page of 210/23/202006:02:51
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/23/202010/23/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010193343843 S SOTO, VERNON594RVERNON & SOTO06:06:1810/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201802 CA0197300VPDMADRIGAL,ALFONSO*31E06:07:3506:35:4906:11:52VPDMANNINO,NICHOLAS20W06:08:5306:47:5506:35:50VPDGODOY,RAYMOND38E06:07:3706:37:4606:12:5220201019342HELIOTROPE ST // DISTRICT BL, VERNONGTART-Mobile USA 888-662-4662 opt 408:04:0310/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201803 CA0197300VPDCERDA,EUGENIO*31E08:05:58 08:07:0008:13:13 08:42:3208:13:3620201019351PACIFIC BL // SANTA FE AV, VERNON902TVERIZON WIRELESS 1-800-451-524212:22:5910/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201804 CA0197300VPDNEWTON,TODD*26W12:24:11 12:24:1413:12:2412:26:30VPDSTEVENSON,KENT,JR22W13:12:2412:26:07VPDCERDA,PAUL,JR32E12:55:1712:27:3820201019358S ATLANTIC BL // DISTRICT BL, VERNON20001RVERIZON WIRELESS 1-800-451-524213:40:3110/23/2020RPTCITYVRECDepartmentOCA NumberRMS JurisVPD CR20201805 CA0197300VPDCERDA,EUGENIO*31E13:44:1716:17:26 15:29:2814:13:09VPDSTEVENSON,KENT,JR22W13:55:3614:12:00VPDCERDA,PAUL,JR32E13:57:51 13:57:5215:03:1313:59:4320201019362S INDIANA // 26TH, VERNONGTARREHRIG PACIFIC15:36:3710/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201806 CA0197300VPDNEWTON,TODD*26W15:40:01 15:40:5116:27:1015:52:40202010193671Page of 210/24/202005:51:46
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/23/202010/23/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019367DOWNEY RD // EXCHANGE AV, VERNON902T17:46:4210/23/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201807CA0197300VPDCERDA,EUGENIO*31E17:49:14 17:49:1419:07:1317:54:41202010193875600 S ALAMEDA, VERNON S/A 100PATCK22:16:1410/23/2020RPT1015DepartmentOCA NumberRMS JurisVPDCR20201808CA0197300VPDMADRIGAL,ALFONSO*43W01:29:0522:16:14VPDGODOY,RAYMOND3222:17:2223:58:1022:30:25VPDMANNINO,NICHOLAS38E22:37:2023:41:3022:40:13VPDCROSS,JEREMYS422:37:2623:25:2123:14:33* Denotes Primary Unit2Page of 210/24/202005:51:46
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/24/202010/24/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010193954890 S ALAMEDA, VERNON594RW & W CONCEPTS01:54:5010/24/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201809 CA0197300VPDMADRIGAL,ALFONSO*43W01:56:3102:52:0601:59:45VPDGODOY,RAYMOND3201:57:4702:52:5401:59:43VPDMANNINO,NICHOLAS38E01:57:4503:00:3901:58:58VPDCROSS,JEREMYS402:58:5402:00:01202010194016TH // SAN JULIAN, VERNONLOCATELAPD CENTRAL06:06:5010/24/2020VRECVPDRECORDS BUREAU*RECD06:22:1706:22:06202010194044223 E DISTRICT BL, VERNON487RUNITED FRESH08:16:1910/24/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201811 CA0197300VPDFLORES,TERESA*20W08:18:15 08:18:4410:21:1508:26:20VPDCERDA,EUGENIO31E08:52:2708:46:51202010194055610 ALCOA AV, VERNONPEDCK08:46:4210/24/2020RPT1015CITEDepartmentOCA NumberRMS JurisVPD CR20201810 CA0197300VPDONOPA,DANIEL*S709:21:5908:46:44VPDNEWTON,TODD26W08:53:5409:23:5909:00:06VPDCERDA,EUGENIO31E08:52:3009:27:2708:53:58202010194074755 E 49TH, VERNON594RH&M09:41:1810/24/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201812 CA0197300VPDDOCHERTY,MICHAEL*32E09:43:46 09:44:4310:27:52202010194091Page of 210/25/202005:59:45
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/24/202010/24/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010194094623 MAYWOOD AV, VERNON487RWINIS AMERICA10:12:0610/24/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201813CA0197300VPDDOCHERTY,MICHAEL*32E10:42:2211:27:3810:54:39VPDFLORES,TERESA20W10:29:56 10:30:1210:31:18202010194324890 S ALAMEDA, VERNON459RW & W CONCEPT19:44:4810/24/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201814CA0197300VPDCAM,PATRICK*43E19:49:34 19:49:3420:30:4219:56:23VPDLUCAS,JASON2220:38:4220:05:20VPDMADRIGAL,ALFONSO3220:06:2621:01:0920:26:31VPDFLORES,TERESA38W20:12:5121:03:2520:26:2920201019433SEVILLE AV // VERNON AV, VERNONPEDCK20:38:1310/24/20201015CITERPTADVDepartmentOCA NumberRMS JurisVPDCR20201815CA0197300VPDCAM,PATRICK*43E21:39:5320:38:13VPDLUCAS,JASON2220:38:5021:39:5220:44:51VPDMADRIGAL,ALFONSO3221:31:1121:10:21* Denotes Primary Unit2Page of 210/25/202005:59:45
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/25/202010/25/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019456E DISTRICT BL // LOMA VISTA AV, VERNONREC02:42:4710/25/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201816CA0197300VPDMADRIGAL,ALFONSO*3206:25:4902:42:47VPDLUCAS,JASON2202:43:4406:13:39VPDMANNINO,NICHOLAS38W02:43:4304:05:1202:45:47VPDCAM,PATRICK43E02:43:02 02:43:0203:23:2502:43:53202010194603770 E WASHINGTON BL, VERNONREC04:54:3310/25/2020VSVRECRPTDepartmentOCA NumberRMS JurisVPDCR20201817CA0197300VPDCAM,PATRICK*43e06:40:3204:54:34VPDMANNINO,NICHOLAS38W04:54:35 04:54:3605:47:2905:00:14202010194714461 S SANTA FE AV, VERNON925CHERISH13:20:5010/25/20201015RPTDepartmentOCA NumberRMS JurisVPDCR20201818CA0197300VPDFLORES,TERESA*38W13:23:0014:33:4713:25:54VPDVILLEGAS,RICHARDXS13:23:0214:33:4713:41:1920201019480S ATLANTIC BL // BANDINI BL, VERNON20002ANA ORTIZ18:53:5510/25/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201819CA0197300VPD*31E18:55:46 18:55:4721:19:2319:03:24VPDLUCAS,JASON2219:51:3919:38:10VPDCAM,PATRICK43W19:45:3319:33:22* Denotes Primary Unit1Page of 110/26/202005:12:27
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/26/202010/26/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019507E 50TH // GIFFORD AV, VERNON2000205:02:0510/26/2020RPTCITYDepartmentOCA NumberRMS JurisVPD CR20201820 CA0197300VPDSALDANA,CARLOS*31E05:23:1205:02:0520201019508HELIOTROPE ST // DISTRICT BL, VERNON211T-Mobile USA 888-662-4662 opt 405:17:0710/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201821 CA0197300VPDLUCAS,JASON*2205:19:42 05:19:4606:10:3305:28:48VPDSALDANA,CARLOS31E05:23:1506:33:0705:26:19VPDCAM,PATRICK43W05:38:2106:04:0405:47:54202010195221844 E 27TH, VERNON484RVERNON SALES08:12:2810/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201822 CA0197300VPDFINO,MARCUS*32W08:13:56 08:14:1509:00:1608:20:03202010195273027 FRUITLAND AV, VERNON487RSAUL GAMBOA09:49:1710/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201824 CA0197300VPDFLORES,TERESA*38E09:52:41 09:52:4611:54:2010:02:09202010195312041 E 25TH, VERNON20002RUNIVERSAL10:44:5110/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201823 CA0197300VPDVILLEGAS,RICHARD*4310:51:2111:20:2011:02:26202010195362938 E 54TH, VERNON487RNEXT LEVEL APPAREL12:46:0410/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201825 CA0197300VPDFLORES,TERESA*38E12:48:28 12:49:0413:47:4912:57:25VPDVILLEGAS,RICHARD4313:47:4912:59:10202010195441Page of 210/27/202005:29:30
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/26/202010/26/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010195444440 E DISTRICT BL, VERNONGTARFRANCISCO GAMEZ STUDIOS14:49:0610/26/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201826CA0197300VPDFLORES,TERESA*38E14:52:4115:55:4315:02:09202010195564755 E DISTRICT BL, VERNON487RVERNON WELL SITE 2018:00:5810/26/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201827CA0197300VPDVILLEGAS,RICHARD*4318:02:32 18:03:3818:29:3618:07:37202010195674900 E 50TH, VERNON20002RSHOW ROOM INTERIOR19:40:5710/26/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201828CA0197300VPDSALDANA,CARLOS*26W19:43:49 19:43:5019:46:04VPDARANA,ANDRE31E19:44:4520:20:3819:52:45202010195762263 E VERNON AV, VERNONREPOTRUE RELIGION22:20:3510/26/2020REPODepartmentOCA NumberRMS JurisVPDCR20201829CA0197300VPDRECORDS BUREAU*RECD22:43:2222:21:04* Denotes Primary Unit2Page of 210/27/202005:29:30
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/27/202010/27/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010195793883 SOTO, VERNON484RFJ FOOD SERVICE00:13:4210/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201830 CA0197300VPDARANA,ANDRE*31E00:16:56 00:16:5600:48:0300:22:17202010195954433 EXCHANGE AV, VERNONGTARLA JUNCTION09:10:2610/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201832 CA0197300VPDGODOY,RAYMOND*38E09:12:0511:51:1309:16:46VPDFINO,MARCUS20W10:25:3910:26:35VPDVELEZ,MARISSA5D3409:26:5009:26:48202010195973636 E 26TH, VERNONMISPLOCATEUNK09:41:3710/27/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201831 CA0197300VPDGODOY,RAYMOND*38E09:43:2610:26:4109:45:41VPDZOZAYA,OSCARMET109:45:1011:32:3610:03:3020201019608DOWNEY RD // 26TH, VERNON902T14:32:0510/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201833 CA0197300VPDGODOY,RAYMOND*38E14:32:1714:58:0914:35:09VPDFINO,MARCUS20W14:32:5714:58:0914:36:07202010196114809 ALCOA AV, VERNON484RGOLDEN STAR IMPORTS16:55:0210/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201834 CA0197300VPDGODOY,RAYMOND*38E16:57:52 16:57:5417:03:24 17:16:4716:57:53VPDVILLEGAS,RICHARD3217:16:4616:59:5920201019614E 26TH // SOTO, VERNONSRMETRENE MALDONADO17:27:3610/27/2020METRPTDepartmentOCA NumberRMS JurisVPD CR20201835 CA0197300VPDFINO,MARCUS*20W17:28:5417:44:3817:30:211Page of 210/28/202005:04:17
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/27/202010/27/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019614E 26TH // SOTO, VERNONSRMETRENE MALDONADO17:27:3610/27/2020METRPTDepartmentOCA NumberRMS JurisVPDCR20201835CA0197300VPDGODOY,RAYMOND38E17:28:5617:44:2617:35:16VPDZOZAYA,OSCARMET117:29:2319:16:0417:31:10* Denotes Primary Unit2Page of 210/28/202005:04:17
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/28/202010/28/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019644CUDAHY // FRUITLAND AV, VERNON20002RLESTER ANDRADE00:39:0610/28/2020ASSTRPTDepartmentOCA NumberRMS JurisVPD CR20201836 CA0197300VPDSALDANA,CARLOS*20E00:42:0302:44:4000:43:5420201019651BANDINI BL // ATLANTIC BL, VERNON902TT-Mobile USA 888-662-4662 opt 404:55:0110/28/2020RPTVPDLANDA,RAFAEL*4104:55:5606:02:3705:01:10VPDSALDANA,CARLOS20E04:59:2406:02:3704:59:54VPDARANA,ANDRE31W04:57:0004:59:45 06:02:3705:47:48USTOWUS TOW05:12:02 05:12:5706:02:3805:43:38202010196664305 S SANTA FE AV, VERNON594RCLAUDIA ARRELLANO10:19:5710/28/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201837 CA0197300VPDSTEVENSON,KENT,JR*22W10:22:24 10:22:2810:51:0010:36:36202010196682959 E 50TH, VERNON242RCHARLIES PRIDE10:54:2810/28/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201838 CA0197300VPDZOZAYA,OSCAR*4311:01:21 11:06:3011:10:58VPDCERDA,PAUL,JR41E11:10:5511:57:3211:16:19202010196724305 S SANTA FE AV, VERNON166R12:22:3210/28/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201839 CA0197300VPDZOZAYA,OSCAR*4313:01:3013:04:21202010196843308 BANDINI BL, VERNON902TTRUCK TERMINAL18:19:2310/28/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201840 CA0197300VPDCERDA,PAUL,JR*41E18:22:08 18:22:1819:15:3418:27:05VPDSTEVENSON,KENT,JR22W19:02:0918:28:051Page of 210/29/202005:04:07
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/28/202010/28/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010196843308 BANDINI BL, VERNON902TTRUCK TERMINAL18:19:2310/28/2020RPTORDepartmentOCA NumberRMS JurisVPDCR20201840CA0197300VPDARANA,ANDRE31E18:56:5219:15:3318:58:51VPD38W18:58:4919:15:33VPDZOZAYA,OSCAR4318:22:2218:49:2818:28:03MR C TOWMR C TO18:41:4619:15:3419:03:20202010197003113 26TH ST, VERNONREC23:06:2110/28/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201841CA0197300VPDGODOY,RAYMOND*38W00:00:1223:06:21USTOWUS TOW23:26:42 23:27:1100:00:0823:48:56* Denotes Primary Unit2Page of 210/29/202005:04:07
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/29/202010/29/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197163049 E VERNON AV, VERNON484RFARMER JOHN08:26:2710/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201842 CA0197300VPDSTEVENSON,KENT,JR*22E08:27:0708:27:51VPDREDONA,BRYAN2STOF09:27:0608:29:5720201019719E 46TH // SOTO, VERNONUNATTACHEDTR09:49:2110/29/2020RPTVIDepartmentOCA NumberRMS JurisVPD CR20201843 CA0197300VPDCERDA,EUGENIO*31W11:14:1309:49:21USTOWUS TOW09:52:28 09:52:4811:24:4110:23:44202010197262660 E 37TH, VERNONGTARDUOCHI INC11:53:1510/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201844 CA0197300VPDOURIQUE,CARLOS*2STOF13:17:2912:40:25202010197272051 E 27TH, VERNONMISPLOCATEURGENT GEAR11:56:1310/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201846 CA0197300VPDCERDA,EUGENIO*31W11:57:57 11:58:2013:22:1211:58:24VPDSTEVENSON,KENT,JR22E11:59:01 11:59:0212:38:3612:03:07202010197294305 S SANTA FE AV, VERNON166R12:40:3210/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201845 CA0197300VPDCERDA,PAUL,JR*4113:01:18 13:01:1813:05:34VPDOURIQUE,CARLOS2STOF14:22:0913:17:35202010197331957 E VERNON AV, VERNON487RTRUST Y13:02:1910/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201847 CA0197300VPDCERDA,EUGENIO*31W13:22:18 13:22:4814:12:2813:23:401Page of 211/03/202006:53:11
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/29/202010/29/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197352910 S ALAMEDA, VERNONID THEFT RPTPROJECT ONE APPAREL13:46:5510/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201848CA0197300VPDCERDA,PAUL,JR*4113:49:32 13:49:3314:49:1814:00:3420201019738ROSS // 38TH, VERNON902TAPRIL14:47:3910/29/2020RPTORCITYDepartmentOCA NumberRMS JurisVPDCR20201849CA0197300VPDCERDA,EUGENIO*31W14:48:36 14:48:5915:39:3914:53:50VPDCERDA,PAUL,JR4116:25:0114:51:16MR C TOWMR C TO14:57:21 14:57:2215:59:5215:23:25202010197394717 E DISTRICT BL, VERNON487RVACANT14:46:5910/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201850CA0197300VPDSTEVENSON,KENT,JR*22E14:49:1215:58:2414:49:53202010197402627 S SOTO, VERNON451RJ AND K15:39:4310/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201851CA0197300VPDCERDA,EUGENIO*31W15:40:21 15:40:2216:24:4615:59:56VPDSTEVENSON,KENT,JR22E16:24:4516:00:53202010197474661 E DISTRICT BL, VERNON902TSLYVIA19:22:0010/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201852CA0197300VPDARANA,ANDRE*31E19:26:0920:19:3019:30:22VPD38W20:09:2219:31:28* Denotes Primary Unit2Page of 211/03/202006:53:11
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/30/202010/30/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197652301 E VERNON AV, VERNON484RARCADIA INC07:02:1810/30/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201853 CA0197300VPDCERDA,EUGENIO*43W07:15:5407:43:0707:19:50202010197675100 S DISTRICT BL, VERNON902TINDIO PRODUCTS08:08:5710/30/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201854 CA0197300VPDSTEVENSON,KENT,JR*22E08:11:28 08:11:3009:02:1708:18:29VPDCERDA,PAUL,JR4109:02:1708:18:0620201019770E 37TH // SEVILLE AV, VERNON902T08:46:2310/30/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201855 CA0197300VPDCERDA,EUGENIO*43W08:49:50 08:49:5409:25:1808:54:3020201019774S SOTO // 50TH, VERNON902T11:16:4210/30/2020RPT S7CITYORDepartmentOCA NumberRMS JurisVPD CR20201857 CA0197300VPDCERDA,EUGENIO*43W12:54:0011:17:06VPDONOPA,DANIELS711:52:0712:27:47202010197943560 E VERNON AV, VERNON415VERNON CITY HOUSING18:31:4710/30/2020ASSTRPTDepartmentOCA NumberRMS JurisVPD CR20201859 CA0197300VPDSTEVENSON,KENT,JR*22E18:35:57 18:36:0119:36:3418:36:36VPD31W18:41:27 18:41:2818:55:35 19:36:3419:26:30VPDCERDA,PAUL,JR4118:35:5919:30:5018:39:18VPDCERDA,EUGENIO43W19:33:5118:54:42VPDCROSS,JEREMYS418:46:55 18:47:0019:36:3518:52:37202010197951Page of 210/31/202005:25:33
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/30/202010/30/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197953113 26TH, VERNONGTAR18:42:5210/30/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201858CA0197300VPD*31W19:26:2718:55:37* Denotes Primary Unit2Page of 210/31/202005:25:33
VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/31/202010/31/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010198262600 45TH, VERNONREC11:36:5710/31/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201860CA0197300VPDNEWTON,TODD*32E12:31:3811:36:57VPDFLORES,TERESA26W12:49:3111:45:33USTOWUS TOW11:56:04 11:56:3712:27:3712:20:33202010198283200 E WASHINGTON BL, VERNON487RPREFFERRED FREEZER13:37:0510/31/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201861CA0197300VPDFLORES,TERESA*26W13:38:44 13:40:2713:41:15 14:19:3413:46:54* Denotes Primary Unit1Page of 111/03/202006:54:30
City Council Agenda Item Report
Agenda Item No. COV-418-2020
Submitted by: Jazmine Hooks
Submitting Department: Public Works
Meeting Date: December 15, 2020
SUBJECT
Arbor Day Foundation Application for Tree City USA
Recommendation:
A. Find that the proposed action is not subject to the California Environmental Quality Act (CEQA) as this
application is not considered a “project” under CEQA which is defined as an action directly undertaken
by a public agency which has the potential for resulting in either a direct physical change in the
environment or a reasonably foreseeable indirect physical change in the environment, Cal. Pub. Res.
Code Section 21065. Under the proposed application, no such activity is being undertaken. Even if the
application were to be considered a “project” under CEQA, which is not the case, CEQA Guidelines
Section 15308 categorically exempts actions taken by regulatory agencies that assure the maintenance,
restoration, enhancement, or protection of the environment. Here, the request for authorization to submit
an application to the Arbor Day Foundation will have no impact on the environment whatsoever; and
B. Approve and authorize the Public Works Department to submit an application to the Arbor Day
Foundation for Vernon to be Certified a Tree City USA for 2020.
Background:
The Arbor Day Foundation is a national non-profit organization dedicated to planting trees and improving
the environment. The Arbor Day Foundation, in partnership with the U.S. Forest Services and National
Association of State Foresters, recognizes cities throughout the nation under its Tree City USA program.
The Tree City USA program provides direction, assistance, and national recognition to communities.
Moreover, by becoming a Tree City USA, the City of Vernon is ensuring that its trees will benefit the
community in many ways. For example, trees can reduce costs for energy, stormwater management, and
erosion control; cut energy consumption by up to 25 percent; boost property values across the city; build
strong ties to our community; educate our community about the value of trees and the importance of
sustainable tree management, and increase community pride.
To qualify for a Tree City USA designation, the City of Vernon must meet four standards established by
the Arbor Day Foundation and the National Association of State Foresters:
1) Designate a responsible Tree Board/Department;
2) Adopt a Tree Ordinance;
3) Implement a Community Forestry Program with an annual budget of at least $2 per capita; and
4) Proclaim and Observe Arbor Day (not required for 2020 due to the COVID-19 pandemic).
On November 19, 2019, the City adopted Ordinance No. 1263, the "Tree Ordinance." Furthermore, there
were 125 trees planted and $100,000 (close to $500 per capita) was spent on tree maintenance.
Vernon was designated as a Tree City USA in 2019. The proposed application would be submitted for
Vernon to be certified a Tree City USA for 2020.
The Department of Public Works’ efforts to maintain and expand the City’s urban forest continues and
staff would like to ensure that the City’s efforts are recognized. As such, it is recommended that the
Department of Public Works be authorized to submit an application to the Arbor Day Foundation for
Vernon to be designated a Tree City USA.
Fiscal Impact:
There is no fiscal impact associated with this report.
Attachments:
1. Arbor Day Foundation Tree City 2020 Application
Dec 9, 2020 3:39 PM
2020 Tree City USA
Application for Certification
The Tree City USA award is in recognition of work completed by the community during the 2020 calendar year.
Primary Contact
Contact Name Daniel Wall
Email Address:dwall@ci.vernon.ca.us
Phone Number:(323) 583-8811
Address:4305 Santa Fe Avenue
Vernon,CA 90058
City of Vernon, California Community Information
Select Which Best Describes Your Community:Community has a Department Chair or City Manager
Ordinance Date:Nov 19, 2019
Ordinance Uploaded
Per Capita Expenditure:484.00
Arbor Day Date:Nov 19, 2019
Proclamation Uploaded
As Mayor or Equivalent of the Community of City of Vernon
____________________________________________________________________________________________________
Mayor or Equivalent Signature Title Date
Application Certification
To Be Completed By The State Forester:
City of Vernon
The above named community has made formal application to this office. I am pleased to advise you that we reviewed
the application and have concluded that, based on the information contained herein, said community is eligible to be
certified as a Tree City USA community, for the 2020 calendar year, having in my opinion met the four standards
required for recognition.
____________________________________________________________________________________________________
State Forester Signature Title Date
ATTEST:
____________________________
Lisa Pope, City Clerk
City Council Agenda Item Report
Agenda Item No. COV-428-2020
Submitted by: Diana Figueroa
Submitting Department: City Administration
Meeting Date: December 15, 2020
SUBJECT
Fiscal Year (FY) 2020/2021 Docket I Grants Awarded by Vernon CommUNITY Fund Grant Committee
Recommendation:
Receive and file the report, as it is being provided for informational purposes only, pursuant to Section
2.167(e) of the Vernon Municipal Code.
Background:
On November 18, 2020, the Vernon CommUNITY Fund Grant Committee (Grant Committee) held its first
grant award meeting for the 2020/2021 Fiscal Year. There were eleven (11) Direct Service Grant
applicants included on the first docket (listed below) and all were approved by the Grant Committee at
the terms recommended:
Direct Service Grantees
1) Alzheimer's Greater Los Angeles (Returning Grantee) - $17,475;
2) Camp TLC at East LA Rising - $48,850;
3) Center for Nonviolent Education & Parenting (Returning Grantee) - $40,000;
4) Chicas Rockeras South East Los Angeles - $25,000;
5) East LA Community Corporation (Returning Grantee) - $60,000;
6) Girl Scouts of Greater Los Angeles (Returning Grantee) - $30,000;
7) Girls on the Run of Los Angeles County (Returning Grantee) - $20,000;
8) Human Services Association (Returning Grantee) - $25,000;
9) Southeast Churches Service Center (Returning Grantee) - $50,000;
10) Woodcraft Rangers (Returning Grantee) - $30,000; and
11) YWCA Greater Los Angeles - $30,000.
Section 2.167(e) of the Vernon Municipal Code requires the Grant Committee Executive Director (City
Administrator) provide the City Council a report of the grant related actions taken by the Grant
Committee within 30 days of any regular meeting and within 15 days of any special meeting at which
grants are awarded.
Fiscal Impact:
The Fiscal Year 2020/2021 Docket I total grant award amount of $373,325 is included in the 2020/2021
City Budget and is within the fiscal year allocations for this type of grant award.
Attachments:
City Council Agenda Item Report
Agenda Item No. COV-443-2020
Submitted by: Lilia Hernandez
Submitting Department: City Administration
Meeting Date: December 15, 2020
SUBJECT
Report on Services Agreement with Engineering Partners, Inc. Consultant Engineers for the Re-Design
and Preparation of Plans for the Atlantic Bridge Widening Project
Recommendation:
Receive and file the report, as it is being provided for informational purposes only pursuant to Section
2.17.12(B)(3) of the Vernon Municipal Code.
Background:
On October 14, 2020 the Public Utilities Department (VPU) requested approval of a Services Agreement
with Engineering Partners, Inc. (EPI) pursuant to VMC Section 2.17.12 (B)(2) for the re-design and
preparation of plans for the relocation of power poles related to the rehabilitation of the Atlantic Blvd.
Bridge (Bridge) over the Los Angeles River, as part of the State’s Atlantic Bridge Widening Project.
Being a contract for professional services, the proposed contract with EPI was exempt from competitive
bidding pursuant to Section 2.17.12(A)(10) of the VMC. VPU's request for approval of the agreement
sought an exemption from Competitive Selection requirements as allowed by VMC Section 2.17.12
(B)(2). After careful review of the request and information provided by VPU, the City Administrator
approved a Services Agreement with EPI pursuant to VMC Section 2.17.12 (B)(3) which provides the
City Administrator the authority to approve contracts up to $100,000 which are found to be in the best
interest of the City. The total cost of the three-year agreement with EPI would not exceed $77,360.
The approval of the Services Agreement with EPI was found to be in the best interest of the City as EPI
possesses the necessary degree of expertise required to complete the re-design and preparation of
plans, as well as extensive knowledge and background specific to the Atlantic Bridge design. The bridge
is being widened as part of a State Cal Trans project to improve regional transportation in the area.
When the Atlantic Bridge Widening Project began in 2012, the City entered into a consulting services
agreement with EPI for the design and preparation of plans for the relocation of power poles related to
the rehabilitation of the Atlantic Bridge. Since then, EPI coordinated closely with the City’s civil bridge
consultant, CNS Engineers. Although a preliminary design was completed in 2018, the plans were
rejected by LADWP this year, as clearances to their right of way adjacent to the bridge were not met. A
re-design of electric facilities would be required to avoid the LADWP right-of-way, however, the original
agreement with EPI had since expired, necessitating a new agreement.
The new contract with EPI allows the company to complete the necessary re-design work and was the
timeliest and most cost-efficient option for the City as EPI has access to pertinent details of the project
and is already familiar with the existing Bridge design. The selection of a different firm would have
resulted in significant delays and increased costs as any other firm would likely perform their own
research, analysis, and design work from scratch. As with all agreements entered into by the City, the
agreement with EPI was reviewed and approved as to form by the City Attorney’s office.
Fiscal Impact:
The fiscal impact associated with the Services Agreement with EPI is not to exceed $77,360 over the
three-year term of the agreement. These costs will be eligible for reimbursement by Cal Trans at the
conclusion of the project.
Attachments:
City Council Agenda Item Report
Agenda Item No. COV-416-2020
Submitted by: Margarita Beltran
Submitting Department: Public Works
Meeting Date: December 15, 2020
SUBJECT
Americans with Disabilities (ADA), Title II, Self-Evaluation and Transition Plan
Recommendation:
Adopt Resolution No. 2020-43 adopting the 2020 City of Vernon Americans with Disabilities (ADA) Act,
Title II, Self-Evaluation and Transition Plan.
Background:
The Americans with Disabilities Act (ADA), enacted by the Federal Government in 1990, requires that
each public agency evaluate its services, policies, and practices to determine whether they are
accessible by those with disabilities. Each public agency is required to adopt a transition plan that
documents current conditions and outlines planned future accessibility improvements. In order to comply
with The Americans with Disabilities Act (ADA) Title II requirements, in 2019, the City of Vernon
approved the Services Agreement with Sally Swanson Architects, Inc. to prepare a Citywide
Accessibility Evaluation and Transition Plan.
The Citywide ADA Self-Evaluation and Transition Plan is intended not to only to comply with federal and
state laws with regards to access and disability, but also seeks to be a representation of accessibility
and reasonable accommodations best practices. As the title suggests, this plan is organized in two
separate reports; The ADA Self-Evaluation Report and the Transition Plan. These reports and supporting
documents were prepared by the City’s consultant, Sally Swanson Architects, Inc., with input from the
public and City of Vernon staff.
The ADA Self-Evaluation identifies current City policies, procedures, and practices as they pertain to its
programs, services and activities; and make the necessary modifications or recommendations to those
policies and practices that do not meet the programmatic requirements of Title II of the ADA. This report
is organized in two sections:
1.Findings and recommendations for City-wide implementation
2.Findings and recommendations on a Department by Department basis
The Transition Plan evaluates the existing condition of City facilities and Public Rights-Of-Way and
provides recommendations in order to meet ADA requirements. This Transition Plan report outlines the
following:
•Identifies physical obstacles in the public entity's facilities that limit the accessibility of its
programs or activities to individuals with disabilities
•Assesses the extent of architectural barriers to program accessibility in the public rights-of-way
and within the buildings and other facilities operated by the City
•Describes in detail the methods that will be used to make the facilities accessible
•Estimates costs for mitigation solutions
•Specifies the steps necessary to achieve compliance
•Provides a schedule for barrier removal/mitigation
•Sets priorities for barrier elimination
•Indicates the Official responsible for implementation of the plan
The purpose of this Citywide ADA Self-Evaluation and Transition Plan is to identify areas where changes
are needed to ensure access is in place for people with disabilities.
Fiscal Impact:
Adoption of the City of Vernon's ADA, Title II, Self-Evaluation and Transition Plan has no fiscal impact.
The mitigation of physical barriers will be budgeted in future fiscal years.
Attachments:
1. Resolution 2020-43
2. City of Vernon ADA Self-Evaluation Report
3. City of Vernon ADA Transition Plan
4. ADA Presentation to City Council
RESOLUTION NO. 2020-43
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON
ADOPTING THE 2020 CITY OF VERNON AMERICANS WITH
DISABILITIES ACT, TITLE II, SELF-EVALUATION AND TRANSITION
PLAN
SECTION 1. Recitals.
A.The City of Vernon is committed to providing programs, services and activities in
a nondiscriminatory manner for individuals with disabilities.
B. Title II of the Americans with Disabilities Act (ADA), enacted by the Federal
Government in 1990, requires that each public agency conduct a self-evaluation of its
services, policies, and practices to determine whether they provide programmatic and
physical accessibility to those with disabilities, and to develop a Transition Plan to guide
reasonably necessary modifications to the City’s policies, practices, or procedures.
C.On August 20, 2019, the City Council of the City of Vernon approved and
authorized the execution of a services agreement with Sally Swanson Architects, Inc., to
prepare a Citywide ADA Self-Evaluation and Transition Plan, in order to comply with the
ADA Title II requirements.
D.The Director of Public Works has recommended the adoption of the 2020 City of
Vernon Americans with Disabilities Act, Title II, Self-Evaluation and Transition Plan.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
VERNON AS FOLLOWS:
SECTION 2. The City Council of the City of Vernon hereby finds and determines
that the above recitals are true and correct.
SECTION 3. The City Council hereby adopts the 2020 City of Vernon Americans
with Disabilities Act, Title II, Self-Evaluation and Transition Plan which has been
presented to the City Council concurrently with this resolution.
/ / /
/ / /
/ / /
/ / /
/ / /
Resolution No. 2020-43
Page 2 of 2
_______________________
SECTION 4.The City Clerk shall certify the passage and adoption of this
resolution and enter it into the book of original resolutions.
APPROVED AND ADOPTED this 15
th day of December, 2020.
______________________
LETICIA LOPEZ, Mayor
ATTEST:
LISA POPE, City Clerk
(seal)
APPROVED AS TO FORM:
_________________________________
ARNOLD M. ALVAREZ-GLASMAN,
Interim City Attorney
The Americans with Disabilities Act
Self-Evaluation Report for the
City of Vernon
Report Prepared by:
Sally Swanson Architects, Inc.
500 Sansome Street, Suite 410
San Francisco, CA 94111
Ian Blakey, Project Manager
Joshua Klipp, ADA Policy Consultant
Table of Contents
City of Vernon 1
Table of Contents 2
I. PROJECT OVERVIEW 4
A. Acknowledgments 4
B. Introduction 4
C. Background Information Regarding the Americans with Disabilities Act and California
State Law 5
1. Purpose of the Americans with Disabilities Act 5
2. Overview of Disability Civil Rights Laws Impacting the City 5
3. ADA Self-Evaluation Requirements 6
4. Who is a Qualified Person with a Disability? 6
D. Scope of the Self-Evaluation 7
E. Self-Evaluation Method of Review 8
F. ADA Transition Plan Requirements 8
G. How This Report is Organized & To Be Utilized 9
II. SURVEY RESPONSES AND RECOMMENDATIONS 10
Printed Communications 10
Communication with People Who Are Deaf or Hard of Hearing 11
Software and Digital Communication 12
Staff & Employees 13
Americans with Disabilities Act 15
Purchasing, Contracts, Vendors 18
General Purchases 20
Construction & Remodels 20
Facilities & Real Estate Management 21
Planning, Construction & Buildings 21
Fleet Services 22
Public Meetings 23
Emergency Procedures 27
Records 28
General 28
1
Department-Specific Accessibility Survey Responses 31
Police 31
Information Technology 32
Requested Trainings 33
Vetting of Self-Evaluation Results 33
Staff Who Contributed to this ADA Self-Evaluation 34
Work Plan for the Self-Evaluation Implementation 35
APPENDICES 39
Appendix A 39
Appendix B 40
Appendix C 41
Appendix D 51
Appendix E 53
Appendix F 54
Appendix G 55
Appendix H 58
Appendix I - Surveys 59
Finance Treasury 59
Fire 72
Health 87
HR 102
IT 119
Police 132
Public Utilities 148
Public Works 164
Appendix J 181
Appendix K 182
2
I. PROJECT OVERVIEW
A. Acknowledgments
Sally Swanson Architects, Inc., (SSA), would like to thank all the Departmental
Survey Respondents, and especially Margarita Beltran, the City’s Project Manager for
this Self-Evaluation, and Assistant Engineer with the Public Works Department. Without
Ms. Beltran’s coordination and the individual Departmental contribution, this project
would not have been possible.
B. Introduction
The City of Vernon is an industrial city of 5.2 square miles located several miles
to the southeast of Downtown Los Angeles in Southern California. Founded in 1905 as
the first exclusively industrial city in the Southwestern United States, Vernon currently
houses more than 1,800 businesses that employ approximately 50,000 people, serving
as a vital economic engine in the region.
The Americans with Disabilities Act (ADA) Title II mandates that covered entities,
such as the City of Vernon, conduct a Self-Evaluation, create a Transition Plan, appoint
an ADA Coordinator, and develop a Grievance Procedure and an ADA Notice of
Compliance. To meet this obligation, and to create a path forward toward total
accessibility, the City has contracted with Sally Swanson Architects, Inc. (SSA) to assist
with meeting (ADA) Title II mandates.
3
This document presents only the ADA Self-Evaluation. This evaluation provides a
comprehensive report outlining a review of the City’s programs, services and activities.
Results of the survey and analysis identify programmatic and administrative barriers to
programs and are contained herein.
C. Background Information Regarding the Americans with
Disabilities Act and California State Law
1. Purpose of the Americans with Disabilities Act
Passed in 1990, the Americans with Disabilities Act (ADA) is one of the most
comprehensive civil rights laws in the nation. It provides protection to an estimated 57
million Americans in: employment (Title I); receipt of programs, services and activities
from State and local government (Title II); the receipt of goods and services from private
businesses (Title III); and telecommunications (Title IV). In 2008, the Americans with
Disabilities Amendment Act (ADAAA) was passed. The ADAAA gives guidance to the
courts regarding who has standing under ADA. The result has been an increasing
number of people who are now able to bring ADA claims in Federal Court.
2. Overview of Disability Civil Rights Laws Impacting the City
The City of Vernon is covered by the ADA Title II, ADAAA of 2008, the
Rehabilitation Act of 1973, and California Government Codes 11135 and 12926. All
contractual activities are also covered by California Government Code 4450.
Employment programs are covered by the ADA (Title I), the ADAAA and California
Government Code 12926. Construction activities are covered by California Code 4450.
4
When comparing State and Federal law 28 CFR 35.103, it is mandated that the most
stringent law be applied to create the maximum amount of access for people with
disabilities. Thus, the most stringent standards were applied to the evaluation reported
in this document.
3. ADA Self-Evaluation Requirements
Required by 28 CFR 35.105, the ADA Self-Evaluation is a complete examination
of all programs, services and activities provided by the City, to ensure that, when
viewed in their entirety, they are readily accessible to qualified people with disabilities.
The purpose of the ADA Self-Evaluation is to identify areas where changes are needed
to ensure access is in place for people with disabilities.
4. Who is a Qualified Person with a Disability?
To be qualified as a person with disabilities for the purposes of this Self -
Evaluation, an individual must have a disability as defined below and must be qualified
to participate in the programs, services or activities of the City.
Under California Government Code 11135, the ADA was incorporated into State
law and therefore the ADA issues raised in this Report are both State and Federal
issues. In California Government Code 12926, the definition of mental and physical
disability was broadened beyond the ADAAA. Summarized as follows:
1. A person having a physical or mental disability that limits a major life activity. This
person is considered as having unmitigated status (i.e., how the individual in
question would function without the use of medication or devices that may
mitigate the impact of the disability). If there is a limitation to a major life activity
in this statute, coverage is established;
2. A person with a history of a disability as described above;
5
3. A person is regarded as having a disability, such as described.
California State law also provides protection to cancer survivors, people who
have a genetic predisposition to illnesses or disabilities or people who have received
services within a special education program.
D. Scope of the Self-Evaluation
The Self-Evaluation is intended as a review of the programs, services and
activities provided by the City. The US Department of Justice (DOJ) within the ADA Title
II, Technical Assistance Manual (TAM) (Section II-8.2000) recommends a scope of
review for Self-Evaluations, which contains thirteen program areas which were
considered for use in the development of this report. Areas considered include:
● The Transition Plan (physical access to certain City facilities),
● Policies that may limit or exclude the participation of people with
disabilities;
● Communication systems used by the City;
● Provision of auxiliary aids and services to people who are engaged in the
City’s programs, services or activities;
● Access to emergency management for people with disabilities;
● Disability awareness among City staff;
● Policies addressing policy modification requests and the determination of
fundamental alteration of programs;
● Access to public meetings;
● Human Resources programs and policies;
● Construction policies;
● City staff training and support;
● ADA-related drug policies.
6
E. Self-Evaluation Method of Review
The ADA mandates that a Self-Evaluation review all programs, services and
activities of the covered entity. The Self-Evaluation of the City’s programs, services, and
activities required and involved the participation of every City Department. In
conjunction with the City’s internal Project Manager and Public Works Department, SSA
developed targeted accessibility surveys. Each Department was assigned relevant
surveys based on their programs, services and activities. Departments were instructed
to complete a survey for different divisions if they were sufficiently separate and unique.
Copies of the surveys are included in the Appendix to this report, and survey responses
and corresponding attachments are available upon request.
F. ADA Transition Plan Requirements
The ADA Transition Plan is required by 28 CFR 35.150 (d). An ADA Transition
Plan must include the following components:
1. A list of all physical barriers in sites at which the City provides programs, services
or activities;
2. A statement regarding the method to be used to mitigate the barriers;
3. A schedule for barrier mitigation;
4. The name of the official who is responsible for the ADA Transition Plan
administration.
The ADA Transition Plan will be contained in a separate report.
7
G. How This Report is Organized & To Be Utilized
The City of Vernon is committed not only to compliance with federal and state
laws regarding disability and access, but strives to be a model of accessibility and
reasonable accommodations best practices. Accordingly, this Report is organized into
two sections: (1) findings and recommendations for City-wide implementation; and (2)
findings and recommendations on a Department by Department basis. Depending on
survey responses, not all Department-specific sections will include recommendations.
This Report is intended to be a summary – not full recitation – of survey results.
Each section begins with an overview of recommendations indicated with square-
shaped box bullet points, and segues into a breakdown of survey summaries providing
the basis for those recommendations. Any recommendations provided by survey
respondents will also be indicated with box bullet points. Other lists, such as lists of
available accessibility resources, are generally indicated with round bullet points.
By organizing it this way, the City can easily access the information it needs and
use this Report to sharpen its focus on providing the best possible service to its
constituents with disabilities, and become a model of best practices.
8
II. SURVEY RESPONSES AND
RECOMMENDATIONS
Printed Communications
Recommendations
❏ Ensure that all City printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with
disabilities.
❏ Ensure that all City printed publications use a uniform, accessible font, and are
reviewed to ensure they do not portray people with disabilities in a demeaning or
offensive way.
❏ Develop and implement staff training to ensure that all publications and
correspondence use “person-first” language.
Survey Responses & Findings
More than half of the survey respondents indicated that readers are not informed
that publications are available in alternative formats, if needed, for persons with
disabilities. Of the remaining responses, respondents were either not sure, believed that
some publications informed readers, or did not respond to the question. Additionally,
more than half of survey respondents indicated that publications are not created using a
specific font, and that publications are not reviewed to determine whether they portray
persons with disabilities in a demeaning or offensive manner. Finally, two-thirds of
respondents indicated that there has been no staff training to ensure that all
publications and correspondence use “person first language”.
9
Communication with People Who Are Deaf or Hard of Hearing
Recommendations
❏ Update business cards and letterhead to indicate “711 the California Relay” and
check to ensure that phone lines are accessible to people who are Deaf or hard
of hearing.
❏ Ensure that there is an identified local resource that can provide auxiliary aids fo r
communication as needed.
❏ If videos are used (internally or for the public), ensure that all Departments are
informed of resources available to make certain that videos are captioned.
❏ Review to determine if there is a policy in place for securing Video Re mote
Interpreting (VRI) services and, if not, create this policy.
❏ For events utilizing a Public Information Officer (PIO), implement policy to ensure
that Departments have an American Sign Language interpreter visible and within
the screenshot if television cameras are in use, and that captioning services are
used as a matter of course.
❏ Check with the Government Building Division to ensure that all Public Address
systems are accessible to persons who are Deaf or hard of hearing.
Survey Responses & Findings
All survey respondents indicated that “711 the California Relay” is either not
listed on business cards and letterheads (or they are not sure if it is). Respondents
either did not know whether phone lines were accessible to people who are Deaf or
hard of hearing, or were certain that phones lin es were not. Of all survey respondents,
only Human Resources indicated that there is an identified local resource that can
provide auxiliary aids for communication as needed. Of all survey respondents, only the
Fire Department indicated that it uses captioned video for training. Another respondent
indicated that captioning is handled by IT; and one other respondent indicated that any
captioning would be handled by the City Administrator or the City Clerk.
Regarding Video Remote Interpreting (VRI) services, respondents indicated that
there is either no policy in place for securing these, or they were not sure if there was a
10
policy in place. For all respondents who indicate that their Department may utilize a
Public Information Officer (PIO), all responses noted that they currently do not have an
American Sign Language interpreter visible and within the screenshot if television
cameras are in use, and / or captioning services are not used as a matter of course.
With respect to captioning of videos in public spaces, survey responses indicated
that these are not typically used. And finally, with regard to Public Address systems,
only one response indicated this may be in use, but noted that it was maintained by the
Government Building Division.
Software and Digital Communication
Recommendations
❏ Establish and implement policy that all websites and electronic communications
comply with current Web Content Accessibility Guidelines (WCAG 2.1 AA).
❏ Establish how WCAG compliance will be maintained and communicate this
expectation across Departments.
❏ Establish and implement policy that all electronic documents (e.g. PDFs, Word
Documents and photographs) are accessible to people with disabilities and/or
are available in alternative, accessible formats.
Survey Responses & Findings
All survey responses indicated either that Departmental websites either are not
accessible to persons with disabilities1, or respondents were not sure if websites are
accessible (including the response from Information Technology “IT”). Five respondents
indicated that their Departments utilize web-based forms either internally or for the
public. Of these respondents, there was no clarity on whether forms are evaluated for
1 See Web Content Accessibility Guidelines (WCAG), e.g. https://www.w3.org/WAI/standards -guidelines/wcag/
11
accessibility, although some Departments indicated that this would be wit hin IT’s
purview. IT did not respond to this question. Two Departments indicated that they use
internally-developed software either internally or externally, and two indicated that they
were not sure if they did or not. One Department indicated that IT man aged software,
and IT did not indicate how it would ensure that this software would be accessible to
persons with disabilities. Most survey respondents indicated that their Department
utilizes third party software, but indicated that either IT or the vendor was responsible
for determining its accessibility to persons with disabilities.
With regard to touch screen information systems for the public, only one
respondent indicated they were not sure whether these were utilized, all other
respondents indicated they do not use such systems (or did not respond to the
question). If utilized, survey responses indicate that there are no independent operating
systems for people with visual impairments.
Two survey responses indicated that they offer some type of computer or digital
device for use by the public, but were not sure whether these had software that ma de
them accessible to persons with disabilities. No survey responses indicated that email
communications ( internal or external), including attachments, are checked for
accessibility. Generally, survey responses indicated a perception that IT is responsibl e
for ensuring web and digital accessibility, but responses to the IT survey were not clear
that this is IT’s responsibility.
Staff & Employees
Recommendations
12
❏ Consider partnering with local disability rights groups and organizations to
affirmatively notify and recruit persons with disabilities to available roles.
❏ Establish practices to ensure that all job listings are accessible.
❏ Ensure that all job listings contain a statement regarding non -discrimination
against persons with disabilities.
❏ Consider implementing methods to offer Staff and Employees an opportunity to
self-identify as a person with a disability.
❏ Create and implement a process to approve reasonable modifications (i.e.
modifications used to create access).
❏ Ensure that all facilities managers have a resource to determine the accessibility
of their facilities, and develop and implement regular processes for the ongoing
evaluation of facility accessibility.
❏ Ensure that all Departments have an easily ascertainable policy against disability
harassment, as well as a grievance system that offers assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance.
❏ Ensure that the City has a current and easily ascertainable policy regarding
service and/or support animals for its employees (and the public).
Survey Responses & Findings
Of all Departments surveyed, only Public Works indicated that it affirmatively
recruits persons with disabilities, and believed this was done through Human Resources
(HR); all other survey respondents either indicated “No” or “Not Sure”, including HR. Of
all Departments surveyed, only HR indicated that it’s job listings were accessible to
persons with disabilities, though it did not indicate how this was done; all other survey
respondents indicated “No” or “Not Sure” as to whether job listings were accessible. At
least one Department noted that job listings are managed by Human Resources.
The majority of survey responses indicated that all job listings contain a
statement regarding non-discrimination against persons with disabilities. Human
Resources indicated that this statement reads, specifically, “The City of Vernon is an
13
equal opportunity employer.”2 Almost all survey responses indicated that a candidate for
employment has the opportunity to request a reasonable accommodation for a
disability. A quick review of the City of Vernon’s website contained the following
information:
Americans with Disabilities Act
All applicants requiring reasonable accommodation throughout the application, testing and
selection process due to a qualified disability must notify the Personnel Department in advance
at (323) 583-8811 ext. 323.
Most survey respondents indicated they were not sure whether interview panel
members are trained regarding disability awareness and appropriate interactions with
people with disabilities, but HR indicated this is “Done as part of interview panel briefing
as part of general non-discrimination.” Nearly all survey responses stated that decisions
to hire are based upon which candidate is best qualified to perform the essential
functions of the job with or without reasonable accommodations (one response
indicated “N/A” and one indicated “Not Sure”).
With respect to how the essential functions of a position are determined, most
survey responses indicated this is done via an analysis of the positions requirements
and functions3, and that job descriptions and listings are managed by HR. With regard
to whether Departments offer Staff and Employees an opportunity to self -identify as a
person with a disability, responses were evenly split between “Yes” and “Not Sure”.
2 The City of Vernon’s website also contains the following statement, “The City of Vernon is an Equal
Employment Opportunity employer and does not discriminate on the basis of race, national origin, color,
sex, religion, ancestry, age, medical condition or physical disability, veteran status, or sexual orientation
in employment or the provision of services.” See http://www.cityofvernon.org/departments/human-
resources.
3 Including the “Police Officer Standards and Training” also known as (POST).
14
By and large, survey responses indicated the accessibility of employee events
such as holiday parties is the responsibility of HR. HR indicated that all employee
events were held at accessible locations. Additionally, all survey responses indicated
that all opportunities for advancement and education a re available and accessible to
Staff and Employees who may have a disability.4
Except for one response that indicated “N/A”, all survey responses confirmed that
there is a process for its staff and/or employees to request a reasonable
accommodation. Most responses referred this to HR, and HR provided a link to the
current procedures for requesting a reasonable accommodation for a disability.5 With
the exception of HR, most survey responses indicated “Not Sure” as to whether the
Department’s reasonable accommodation process includes a search for transfer into a
vacant, funded role as an accommodation of last resort. A review of the Reasonable
Accommodations policy provided by HR, however, (and linked below), includes the
following language in relevant part:
“Typical accommodations include . . . reallocating non-essential job duties, altering
work schedules, reassignment to a vacant position” [Emphasis added].6
Half of survey respondents were not sure whether reasonable modifications,
used to create access, were approved prior to being put in place. Several respondents
believed this was the responsibility of Human Resources, but HR was not sure whether
reasonable access was so approved. The Police Department indicated that this would
4 Except for IT, which indicated “N/A”.
5 See, http://www.cityofvernon.org/images/hr/personnel-policies-
procedures/Reasonable_Accommodation_for_Disabled_Applicants__Employees.pdf
6 See footnote 5, supra.
15
be done by the Captain or Division Commander, and the Fire Department indicated it
would be done by the Department Head.
With regard to accessible facilities, three respondents indicated that their facilities
are accessible at all times; three were not sure; two indicated “N/A ” - HR and Public
Utilities (who indicated that this would be done by Public Works). The Police
Department noticed that accessibility of its facilities was the responsibility of
Maintenance and Facilities.
Three survey respondents indicated they were not sure if their Department had a
policy against disability harassment. Four of eight responses were not sure if their
Department’s grievance system offers assistance to people with disabilities who, due to
their disability, are not able to independently comp lete the grievance. Nearly all survey
responses indicated their Department had not received any complaints or grievances
regarding failure to reasonably accommodate and/or lack of accessibility by candidates,
employees, or visitors to any of their offices. The one exception to this was HR, who
indicated they had at some point received one informal complaint from an employee
who believed a reasonable accommodation should have been provided.
With the exception of Public Works, all survey respondents indicated that their
Departments do not supervise maintenance staff. Public Works noted that maintenance
staff they supervise receive training on how to maintain an accessible environment.
Finally, all survey responses indicated either “No”, “Not Sure” or “N/A” when asked
whether their Department has a policy regarding service and/or support animals for its
employees.
16
Purchasing, Contracts, Vendors
Recommendations
❏ Create and implement City policy to ensure that accessibility is considered when
purchasing new equipment.
❏ Ensure that documents related to bidding and contracting are uniformly (i.e.
across Departments) accessible and available in alternative formats.
❏ Ensure that meetings related to bidding and contracting are uniformly (i.e. across
Departments) held in accessible locations.
❏ Ensure that contractual language is uniformly (i.e. across Departments) in place
holding contractors and vendors to applicable State and Federal disability civil
rights mandates.
❏ Create and implement City policy to ensure that all products and services offered
by third parties and vendors are fully accessible.
❏ Create and implement City policy to ensure that accessibility plan checks are
performed when vendors conduct tenant improvements in public service areas.
❏ Develop and offer guidance for staff and vendors regarding clear space and
furniture placement.
❏ Inform all Departments as to what steps an employee or member of the public
with a disability has available if they believe they have been discriminated
against by a County vendor or contractor.
Survey Responses & Findings
All survey respondents indicated that, when the purchase of new equipment is
made, ( including, but not limited to, communication and transportation equipment) they
are either not sure or it is not reviewed to ensure that it is accessible to users with
disabilities. With regard to the accessibility of documents related to bidding and
contracting, only the Police and Fire Departments indicated these were accessible
and/or available in alternative formats; remaining respondents indicated they were not
sure, or that accessibility of these materials was not consistent. With regard to the
accessibility of meetings related to bidding and contracting, only Public Works indicated
17
that these were always held in accessible locations, the remaining respondents were
not sure.
In response to the question as to whether all City contracts have language in
place holding contractors and vendors to applicable State and Federal disability civil
rights mandates, three responses indicated yes, three indicated “Not Sure” and one
response indicated not consistently.7 With regard to how City Departments ensure that
all products and services offered by third parties and vendors are fully accessible, a
range of responses were offered, e.g. that: this is enforced by contract;
accommodations would be made as needed; or that this is not applicable since these
products and services would apply internally to IT only.
Most survey respondents were not sure whether accessibility plan checks are
performed when vendors conduct tenant improvements in public service areas; and only
one response affirmatively indicated that guidance is in place for staff and vendors
regarding clear space and furniture placement. With regard to what steps an employee
or member of the public with a disability who believes they have been discriminated
against by a County vendor or contractor has available, survey responses varied:
internal complaints to HR/public response to website; City Attorney or City Clerk or HR;
or no responses (from HR or Health).
7 One response indicated that the City’s standard contracts all carry the following language, "Contractor
certifies and represents that, during the performance of this Contract, it and any other parties with whom it
may subcontract shall adhere to equal employment opportunity practices to assure that applicants,
employees and recipients of service are treated equally and are not discriminated against because of
their race, religion, color, national origin, ancestry, disability, sex, age, medical condition, s exual
orientation or marital status. Contractor further certifies that it will not maintain any segregated facilities.
Contractor further agrees to comply with The Equal Employment Opportunity Practices provisions as set
forth in Exhibit “E”."
18
General Purchases
Recommendations
❏ Establish a uniform process for ensuring accessibility of items - including
furniture and items with operational parts - purchased for installation.
Survey Responses & Findings
With regard to checks in place for items purchased for installation, two survey
responses indicated this would be the responsibility of the Maintenance Department,
and one survey indicated this would be done according to applicable building codes.
One survey indicated that items purchased by Departments are not for general use, and
would not need to be used by persons with disabilities. With regard to purchasing items
that contain operational parts, one Department indicated that it considered accessibility
when purchasing; remaining responses indicated either “Not Sure” or that items
purchased “are typically not subject for use by disabled persons.” Finally, with respect to
the accessibility of purchased furniture, two survey responses affirmatively stated that
this is a consideration, and remaining responses indicated either that it is not, or that
they were not sure.
Construction & Remodels
Recommendations
❏ Establish a uniform process to ensure that design contracts hold design
professionals to designs that use, at a minimum, the most stringent access
standards in effect at the time of the project.
❏ Review to see whether processes to ensure that persons with disabilities are
engaged by the City on major construction projects exist and, if not, develop and
implement these protocols.
19
Survey Responses & Findings
Survey responses were evenly split on whether design contracts hold design
professionals to designs that use, at a minimum, the most stringent access standards in
effect at the time of the project; or whether design professionals are encouraged to
exceed minimum requirements. Survey responses were also split on whether persons
with disabilities are engaged by the City on major construction projects, with one
response indicating this engagement was performed by Publ ic Works.
Facilities & Real Estate Management
Recommendations
❏ Review to determine whether there is a policy ensuring proper maintenance of
accessible features and, if not, establish and implement such a policy.
Survey Responses & Findings
Public Works indicated that it oversees the accessibility of public rights of way,
and that it: “ensures that any new improvements to all public right of way are following
the latest accessibility requirements. Plan review and inspections are performed to
certify that all requirements are followed. Maintenance is performed on a regular basis
and public/employee accessibility concerns are evaluated per request.” Public Works
maintains an accessibility checklist and performs inspections, though it is not clear
whether there is a policy ensuring proper maintenance of accessible features.
Planning, Construction & Buildings
20
Recommendations
❏ Review the City’s website to make sure that any complaint or grievance process
is readily ascertainable and accessible.
Survey Responses & Findings
Public Works indicated that it “evaluates reviews and provides comments to
applicants to ensure the latest accessibility requirements are implemented in
(construction) plans.” Additionally, “Inspection is performed during all phases of
construction and on a regular basis to certify that construction is being performed per
approved plans and per accessibility requirements.” Any complaints regarding a lack of
accessibility during construction may be submitted through the City’s website.8 Survey
responses either were unsure whether the City has staff or employees who evaluate
accessibility of built environments for persons with disabilities, or affirmatively indicated
that the City does not. With regard to Capital projects, Public Works indicated that it
does not consistently use an accessibility checklist.
Fleet Services
Recommendations
❏ Review any fleet services (not including the Police Department) to determine
whether such services are accessible, or can be made accessible, upon request
for a reasonable accommodation.
Survey Responses & Findings
Approximately half of survey respondents indicated that they provide some sort
of Fleet Services. The Police Department indicated that accessibility of these services -
8 A quick review of the City’s website did not make clear where complaints are to be submitted.
21
primarily the transport of prisoners - is achieved via State contractual requirements, and
that Service Animals are allowed on transportation. Public Works indicates that, with
respect to accessibility, it follows HR measures, but it was unsure whether Service
Animals are permitted. Public Utilities stated that transportation services are for
employees only.
Public Meetings
Recommendations
❏ Create and implement an events accessibility checklist for all Departments that
hold public meetings which addresses, at a minimum, the items included within
this portion of the Self-Evaluation survey.
Survey Responses & Findings
Five Departments indicated that they hold public meetings. Of these
Departments, three indicated that they do not have a checklist with regard to events
accessibility, and two Departments were not sure. Four Departments indicated that they
were not sure if, when security checks are required to attend any public function,
security personnel trained in best practices for conducting security checks for persons
with disabilities.
With regard to whether all meeting notices contain an announcement that
reasonable accommodations are available for persons with disabilities, one survey
response indicated “Yes”, two indicated “No”, and two were not sure. Two of five survey
responses indicated that persons who administer public meetings are not trained in how
22
to respond to requests for reasonable accommodations by members of the public, and
three responses indicated they were not sure if this was done.
All responding Department surveys indicated that steps are taken to ensure that
all meetings are held in buildings and rooms that are fully accessible. The Fire and
Police Department noted this was done by holding public meetings in Council
Chambers. Only Public Works indicated that staff is trained to set up meeting rooms to
provide maneuvering space for persons who use wheelchairs or service animals. Two
other survey respondents either indicated staff was not trained in this way, or they were
not sure.
All responding Departments indicated that indoor or outdoor surfaces where
persons with disabilities will travel (for events) are smooth, stable and slip resistant,
except for Human Resources, which indicated they were not sure. Three responding
Departments indicated that all public meetings are held on sites that are accessible by
public transportation, except for Human Resources and Public Utilities, which were not
sure. Almost all survey respondents indicated that they were unsure whether public
meeting notices contain language indicating that service animals are welcome.
Almost all survey respondents indicated that they were not sure whether service
animal relief areas identified before every public meeting. All responses indicated either
“No”, “Not Sure” or “Not consistently” when asked whether emergency exits were
identified before every public meeting. On the question of whether stages, speaking
platforms, microphones and other items to be used by persons with disabilities
accessible, survey results were as follows:
23
On the question of whether all public meetings have reserved seating for people
who use wheelchairs, results were as follows:
All surveys indicating “Yes” also noted that this reserved seating also includes
integrated companion seating. Four of five survey respondents indicated that they were
not sure whether presenters at public meetings trained are on best practices for
presenting content to persons with disabilities, and the remaining respondent indicated
this was not done. With regard to whether FM loop systems are available for persons
who are deaf or hard of hearing, survey results were as follows:
24
Four of five survey respondents indicated that they were not sure whether sign
language interpreters and/or real-time captioners were available for all public meetings,
and one response indicated that they are not. With regard to the question of what
processes are in place to ensure that people with disabilities are able to participate in
public speaking at all events, e.g. public comment, the responses were that would be
handled by: Human Resources, the City Clerk, City Admin Office, or the respondent
was unsure or answered “N/A”.
With regard to the question as to whether any public events utilize security
measures (e.g. magnometers, wands, bag checks), survey responses indicated either
“No” or “Not Sure” and were additionally not sure whether any security personnel were
trained in best practices for conducting security checks of persons with disabilities.
Two survey respondents, including HR, indicated that they were unsure what
processes are in place to ensure that exhibits, displays, and other materials offered to
the public are fully accessible. The remaining respondents indicated that this would be
the responsibility of HR or the City Clerk.
25
Emergency Procedures
Recommendations
❏ Ensure that all Departments have procedures in place regarding the evacuation
of persons with disabilities.
❏ Communicate with emergency partners to ensure that any evacuation facilities
are accessible to persons with disabilities.
Survey Responses & Findings
Of the five survey responses, four indicated “Not Sure” and one indicated “Yes”
to the question of whether their Department has procedures in place regarding the
evacuation of persons with disabilities. Four of five survey respondents indicated that
they do not utilize Department vehicles for transporting civilians in any instance,
including emergency evacuation incidents. Only one Department, the Police
Department, indicated that it does utilize vehicles in this way, that these vehicles are not
wheelchair accessible, and that they would accommodate any requests from persons
with disabilities.
Two survey respondents - the Fire Department and the Police Department - work
in partnership with other entities regarding the set up and administration of evacuation
shelters or centers. The Police Department survey response, indicated that those
partnerships would, “Depends on the circumstances. We could work with Red Cross or
transportation agencies in the event the Emergency Operation Center is activated. The
is also the local Bell Shelter. The Fire Department noted that “If and when required, (we
would) coordinate shelter operations with local emergency support personnel.”
26
Records
Recommendations
❏ Develop and implement protocols to ensure the uniform accessibility of City
records to persons with disabilities.
Survey Responses & Findings
Responding Departments indicated that records are kept both digitally and in
hard copies. With regard to how City Departments ensure that digital records are fully
accessible to persons with disabilities, survey responses noted that this was done,
essentially, in two ways: (1) via digital or Laserfiche access; or (2) upon reasonable
accommodation request. One response indicated there was no process for providing
access to records.
With regard to how Departments offer assistance to persons with disabilities with
regard to public records services, e.g. filing, requesting documents, reviewing
documents, one survey response indicated this was not done; remaining survey
responses indicated accommodations could be made on request, or would be referred
to the City Clerk.
General
Recommendations
❏ Ensure that all Departments have ADA Notices of Compliance posted.
❏ Ensure that all Departments have policies regarding service and/or emotional
support animals for its employees and/or the public.
❏ Ensure that all electronic informational kiosks are accessible to persons with
disabilities.
27
❏ Ensure that all Departments that offer printed informational brochures to the
public, and all Departments that issue any sort of fine or citation, have those
available in large print format, and are able to provide alternative formats upon
request.
❏ Ensure that IT is trained and able to determine whether any automation initiatives
(e.g. web and mobile applications) that interface with the public, meet current
digital accessibility guidelines.
❏ Ensure that all Departments have a policy in place that prohibits discrimination
against people who formerly used drugs illegally and have been through a
rehabilitation program.
Survey Responses & Findings
Three survey respondents stated that their Departments have ADA Notices of
Compliance posted, and specifically in: employee common areas, a break room, and in
records. The remaining respondents either indicated that notices were not posted, or did
not provide a response. With regard to whether Departments have any policies
regarding service and/or emotional support animals for its employees and/or the public,
the Police Department responded affirmatively, and all remaining responses indicated
either “No”, “N/A” or no response was provided.
Of all respondents, only the Fire Department indicated that it offers transportation
services, specifically 911 EMS. Of all respondents, only IT indicated that it has
electronic informational kiosks, and was not sure whether these were accessible. Six
survey responses stated that they offer printed informational brochures to the public. Of
these responses, Departments indicated that that these materials are: offered in large
print format upon request; or are not available in large print format.
Four survey respondents indicated that their Department issues warnings,
penalties and/or citations. Access to the information included on these documents is
achieved: on a case by case basis; by being read out loud, including saving the
28
document or recording the recording on a thumb drive or leaving the information on a
voice message; mailed, or hand delivered; or sent in the same manner as regular
invoices (i.e. it is not provided in an additional format). Two survey responses stat ed
that they are currently involved in automation initiatives (e.g. web and mobile
applications) that interface with the public, and that whether these were accessible is
either unsure or managed by IT. Five survey responses noted that, while they are not
currently involved in automation initiatives, they may be in the future and believed that
accessibility would be managed either by HR or IT.
With regard to how City Departments receive complaints of lack of accessibility
or requests for reasonable accommodation from the public, responses were:
● Any complaints can be provided verbally, in writing, or on the phone.
● If/when it may occur, most likely via phone call.
● Complaints can be received verbally, electronically, or in writing.
● It would be reported to a supervisor or HR.
● Online through (the) city's website and phone.
Six survey responses indicated that no complaints regarding accessibility have
been received, and one was unsure. Five survey responses, including HR, indicated
that their Department does not have a policy in place that prohibits discrimination
against people who formerly used drugs illegally and have been through a rehabilitation
program, and one Department was unsure. One survey response, the Police
Department, indicated that it did have this policy, which would be maintained by HR. All
responding surveys indicated that, based on Self-Evaluation questions, there are areas
where training of Department staff would be beneficial.
29
Department-Specific Accessibility Survey Responses
The following section addresses survey responses, not already addressed, on a
Department-by-Department basis.
Police
Recommendations
❏ With regard to animals of persons involved in arrests, update all policies -
including service and emotional support animal policies - to ensure that any
animals who may be temporarily sent to Animal Care and Control or any animal
shelter are not to be inadvertently euthanized.
Survey Responses & Findings
Police Department survey responses indicated that first responders have been
trained regarding State and Federal disability civil rights mandates. Additionally, holding,
booking and visitor areas have been reviewed for access. Further, where inmate phone
systems are provided, there is a phone system for inmates who are deaf or hard of
hearing.
With regard to how service animals are dealt with in arrests, the Police
Department stated that “It depends if the animal is required because of the disability. If
the animal exhibits vicious behavior or poses a direct threat to the health of others, or
reasonably disrupts or interferes with normal business operations, an officer may direct
the handler to remove the animal from the premise.” With regard to how medical
appliances are managed during arrests, the Department stated, “With reasonable
accommodations. Arrests with medical related concerns are sent to a nearby medical
facility for a pre-booking. The doctor will document the medical needs and the needs will
30
be accommodated in accordance with our jail housing facility's policy (either the
Huntington Park Jail or the Los Angeles Sheriff's Dept). Generally cases like this will be
released OR (on their own recognizance).”
With regard to how medication needs are managed in the event of arrest, the
Department stated, “The person is taken for a pre-booking and the Doctor will prescribe
the medication. All persons arrested with medical needs get transported to the county
jail, wherein their staffing nurses generally handle their medication intake.” And with
regard to how Miranda rights may be communicated to persons who are deaf or hard of
hearing, the Department stated, “TTY or we ask for assistance from personnel at the
Holy Angels Church of the Deaf, in Vernon.”
According to survey responses, 911 systems are tested for compatibility with
911, and there is a procedure in place for officers to obtain a sign language interpreter
when one is needed on an emergency basis.
Information Technology
Recommendations
❏ Develop and implement regular training on current Web Content Accessibility
Guidelines (WCAG).
❏ Assist City Departments with regular web and digital accessibility testing to
ensure the accessibility of websites, software, mobile applications, forms -
essentially all digital platforms and interfaces - that may be utilized by employees
and/or the public.
Survey Responses & Findings
Survey responses indicate that, in response to the question as to how IT ensures
that all Information & Communication Technology services within its purview, and
31
mobile applications, are fully accessible, currently it does not. Additionally the
Department does not offer and/or receive regular training regarding digital and web
accessibility.
Requested Trainings
Survey respondents indicated that they would find regular trainings regarding
disability issues to be helpful.
Vetting of Self-Evaluation Results
The City of Vernon is committed to the vetting of these results with stakeholders as
required by law and developing an implementation plan designed to implement
necessary changes and track good-faith compliance efforts.
Vetting Activity
Report Concerning the Self-Evaluation Vetting
● Date(s) and location(s) of vetting
● List of attendees
Input Received During Vetting
32
Response to Input during Vetting:
Persons Involved in Vetting:
Use of This Self-Evaluation as a Living Document
The ADA requires that a Self-Evaluation be conducted once. Many entities, including
the City of Vernon, recognize the value of using this document on an ongoing basis. As
such, it's available to incorporate new policies as needed in response to emerging
issues in case law, new regulations or the development of, and/or modification of the
City’s programs. Thus, an addendum to this report can be added as needed to
document the City’s good-faith effort to make the changes necessary to ensure
appropriate access for the public, employees and visitors to the City of Vernon.
Staff Who Contributed to this ADA Self-Evaluation
The following list shows the departments that completed Self-Evaluation surveys
originally sent to the points of contact below. Some of these departments, however,
completed the surveys as part of a group effort where other staff members within their
department provided input and contributed to the survey’s completion.
Department Point of Contact
Public Works Director of Public Works
Finance/Treasury Director of Finance
Fire Department Interim Fire Chief
Health Health Director
Human Resources Director of Human Resources
33
Public Utilities Interim General Manager of VPU
Police Department Chief of Police
Information Technology Information Technology Manager
Work Plan for the Self-Evaluation Implementation
The following is the City of Vernon’s ADA Self-Evaluation work plan. It is contained in a
spreadsheet designed to be modified as progress is made. It may also be modified
when work is necessary that is not identified within the body of this Report. Such
instances may occur pursuant to new regulations or case law developments.
The first column will contain a series of recommendations that come from interaction
with the City of Vernon officials. These are entitled "General Recommendations". The
second column is "Action Taken by the City”. This column is designed to record whether
the City has accepted the recommendation, modified or rejected it. If the
recommendation is rejected or modified it would be advisable to record the rationale for
this action in the "notes" section, which is the seventh column to the right. Columns
titled "Staff Assigned," “Due Dates,” "Reviewed by,” and “Date ” are designed to record
progress in the implementation of the ADA Self-Evaluation.
Many of the recommendations are clustered by subject and can be addressed with one
staff assignment. Occasionally, there will be one recommended action that addresses a
number of issues noted within the report. For example, disability awareness training
benefits the City’s operation in a number of areas which are noted by findings. The
provision of the training, therefore, addresses a wide variety of issues.
It is very important that the date on the work plan be updated each time an entry is
made.
34
NO.SUBJECT MATTER RECOMMENDATION(S)DATE ASSIGNED ASSIGNEE(S)MILESTONE(S)DUE DATE TRAINING (Y/N)CITY OF VERNON
NOTE(S)
1
Printed
Communications
Ensure that all City printed publications and notices inform
readers that the publications are available in alternative
formats, if needed, for persons with disabilities.
2
Printed
Communications
Ensure that all City printed publications use a uniform,
accessible font, and are reviewed to ensure they do not
portray people with disabilities in a demeaning or offensive
way.
3 Printed
Communications
Develop and implement staff training to ensure that all
publications and correspondence use “person-first” language
4 Communication with
People Who Are Deaf
or Hard of Hearing
Update business cards and letterhead to indicate “711 the
California Relay” and check to ensure that phone lines are
accessible to people who are Deaf or hard of hearing.
5 Communication with
People Who Are Deaf
or Hard of Hearing
Ensure that there is an identified local resource that can
provide auxiliary aids for communication as needed.
6 Communication with
People Who Are Deaf
or Hard of Hearing
If videos are used (internally or for the public), ensure that all
Departments are informed of resources available to make
certain that videos are captioned.
7 Communication with
People Who Are Deaf
or Hard of Hearing
Review to determine if there is a policy in place for securing
Video Remote Interpreting (VRI) services and, if not, create
this policy.
8
Communication with
People Who Are Deaf
or Hard of Hearing
For events utilizing a Public Information Officer (PIO),
implement policy to ensure that Departments have an
American Sign Language interpreter visible and within the
screenshot if television cameras are in use, and that captioning
services are used as a matter of course.
9 Communication with
People Who Are Deaf
or Hard of Hearing
Check with the Government Building Division to ensure that all
Public Address systems are accessible to persons who are Deaf
or hard of hearing.
10 Software and Digital
Communication
Establish and implement policy that all websites and electronic
communications comply with current Web Content
Accessibility Guidelines (WCAG 2.1 AA).
11 Software and Digital
Communication
Establish how WCAG compliance will be maintained and
communicate this expectation across Departments.
12
Software and Digital
Communication
Establish and implement policy that all electronic documents
(e.g. PDFs, Word Documents and photographs) are accessible
to people with disabilities and/or are available in alternative,
accessible formats.
City of Vernon - Self-Evaluation Work Plan
35
13
Staff & Employees
Consider partnering with local disability rights groups and
organizations to affirmatively notify and recruit persons with
disabilities to available roles.
14 Staff & Employees Establish practices to ensure that all job listings are accessible.
15
Staff & Employees
Ensure that all job listings contain a statement regarding non-
discrimination against persons with disabilities.
16
Staff & Employees
Consider implementing methods to offer Staff and Employees
an opportunity to self-identify as a person with a disability.
17 Staff & Employees Create and implement a process to approve reasonable
modifications (i.e. modifications used to create access).
18
Staff & Employees
Ensure that all facilities managers have a resource to
determine the accessibility of their facilities, and develop and
implement regular processes for the ongoing evaluation of
facility accessibility.
19
Staff & Employees
Ensure that all Departments have an easily ascertainable
policy against disability harassment, as well as a grievance
system that offers assistance to people with disabilities who,
due to their disability, are not able to independently complete
the grievance.
20
Staff & Employees
Ensure that the City has a current and easily ascertainable
policy regarding service and/or support animals for its
employees (and the public).
21 Purchasing, Contracts,
Vendors
Create and implement City policy to ensure that accessibility is
considered when purchasing new equipment.
22 Purchasing, Contracts,
Vendors
Ensure that documents related to bidding and contracting are
uniformly (i.e. across Departments) accessible and available in
alternative formats
23 Purchasing, Contracts,
Vendors
Ensure that meetings related to bidding and contracting are
uniformly (i.e. across Departments) held in accessible
locations.
24
Purchasing, Contracts,
Vendors
Ensure that contractual language is uniformly (i.e. across
Departments) in place holding contractors and vendors to
applicable State and Federal disability civil rights mandates.
25 Purchasing, Contracts,
Vendors
Create and implement City policy to ensure that all products
and services offered by third parties and vendors are fully
accessible.
26 Purchasing, Contracts,
Vendors
Create and implement City policy to ensure that accessibility
plan checks are performed when vendors conduct tenant
improvements in public service areas.
27 Purchasing, Contracts,
Vendors
Develop and offer guidance for staff and vendors regarding
clear space and furniture placement.
28
Purchasing, Contracts,
Vendors
Inform all Departments as to what steps an employee or
member of the public with a disability has available if they
believe they have been discriminated against by a County
vendor or contractor.
36
29
General Purchases
Establish a uniform process for ensuring accessibility of items -
including furniture and items with operational parts -
purchased for installation.
30
Construction &
Remodels
Establish a uniform process to ensure that design contracts
hold design professionals to designs that use, at a minimum,
the most stringent access standards in effect at the time of the
project.
31
Construction &
Remodels
Review to see whether processes to ensure that persons with
disabilities are engaged by the City on major construction
projects exist and, if not, develop and implement these
protocols
32 Facilities & Real Estate
Management
Review to determine whether there is a policy ensuring proper
maintenance of accessible features and, if not, establish and
implement such a policy
33
Planning, Construction
& Buildings
Review the City’s website to make sure that any complaint or
grievance process is readily ascertainable and accessible.
34
Fleet Services
Review any fleet services (not including the Police
Department) to determine whether such services are
accessible, or can be made accessible, upon request for a
reasonable accommodation.
35
Public Meetings
Create and implement an events accessibility checklist for all
Departments that hold public meetings which addresses, at a
minimum, the items included within this portion of the Self-
Evaluation survey.
36
Emergency Procedures
Ensure that all Departments have procedures in place
regarding the evacuation of persons with disabilities.
37
Emergency Procedures
Communicate with emergency partners to ensure that any
evacuation facilities are accessible to persons with disabilities.
38 Records Develop and implement protocols to ensure the uniform
accessibility of City records to persons with disabilities.
39 General Ensure that all Departments have ADA Notices of Compliance
posted.
40
General
Ensure that all Departments have policies regarding service
and/or emotional support animals for its employees and/or
the public.
41 General Ensure that all electronic informational kiosks are accessible to
persons with disabilities.
42
General
Ensure that all Departments that offer printed informational
brochures to the public, and all Departments that issue any
sort of fine or citation, have those available in large print
format, and are able to provide alternative formats upon
request.
43
General
Ensure that IT is trained and able to determine whether any
automation initiatives (e.g. web and mobile applications) that
interface with the public, meet current digital accessibility
guidelines.
44
General
Ensure that all Departments have a policy in place that
prohibits discrimination against people who formerly used
drugs illegally and have been through a rehabilitation
program.
37
45
Police
With regard to animals of persons involved in arrests, update
all policies - including service and emotional support animal
policies - to ensure that any animals who may be temporarily
sent to Animal Care and Control or any animal shelter are not
to be inadvertently euthanized.
46
Information Technology
Develop and implement regular training on current Web
Content Accessibility Guidelines (WCAG).
47
Information Technology
Assist City Departments with regular web and digital
accessibility testing to ensure the accessibility of websites,
software, mobile applications, forms - essentially all digital
platforms and interfaces - that may be utilized by employees
and/or the public
38
APPENDICES
Appendix A
28 CFR 35.105 Self-Evaluation.
● (a) A public entity shall, within one year of the effective date of this part,
evaluate its current services, policies, and practices, and the effects thereof,
that do not or may not meet the requirements of this part and, to the extent
modification of any such services, policies, and practices is required, the
public entity shall proceed to make the necessary modifications.
● (b) A public entity shall provide an opportunity to interested persons,
including individuals with disabilities or organizations representing
individuals with disabilities, to participate in the Self-Evaluation process by
submitting comments.
● (c) A public entity that employs 50 or more persons shall, for at least three
years following completion of the Self-Evaluation, maintain on file and make
available for public inspection:
o (1) A list of the interested persons consulted;
o (2) A description of areas examined and any problems identified;
and
o (3) A description of any modifications made.
● (d) If a public entity has already complied with the Self-Evaluation
requirement of a regulation implementing section 504 of the Rehabilitation
Act of 1973, then the requirements of this section shall apply only to those
policies and practices that were not included in the previous Self-Evaluation.
39
Appendix B
California Government code section 11135
11135. (a) No person in the State of California shall, on the basis
of race, national origin, ethnic group identification, religion,
age, sex, sexual orientation, color, genetic information, or
disability, be unlawfully denied full and equal access to the
benefits of, or be unlawfully subjected to discrimination under, any
program or activity that is conducted, operated, or administered by
the state or by any state agency, is funded directly by the state, or
receives any financial assistance from the state. Notwithstanding
Section 11000, this section applies to the California State
University.
(b) With respect to discrimination on the basis of disability,
programs and activities subject to subdivision (a) shall meet the
protections and prohibitions contained in Section 202 of the federal
Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and
the federal rules and regulations adopted in implementation thereof,
except that if the laws of this state prescribe stronger protectio ns
and prohibitions, the programs and activities subject to subdivision
(a) shall be subject to the stronger protections and prohibitions.
(c) (1) As used in this section, "disability" means any mental or
physical disability, as defined in Section 12926.
40
Appendix C
California Government Code Section 12926
Cal Gov Code § 12926 (2010)
§ 12926. Definitions regarding unlawful practices
As used in this part in connection with unlawful practices, unless a different meaning
clearly appears from the context:
(a) "Affirmative relief" or "prospective relief" includes the authority to order
reinstatement of an employee, awards of backpay, reimbursement of out-of-pocket
expenses, hiring, transfers, reassignments, grants of tenure, promotions, cease and
desist orders, posting of notices, training of personnel, testing, expunging of records,
reporting of records, and any other similar relief that is intended to correct unlawful
practices under this part.
(b) "Age" refers to the chronological age of any ind ividual who has reached his or
her 40th birthday.
(c) "Employee" does not include any individual employed by his or her parents,
spouse, or child, or any individual employed under a special license in a nonprofit
sheltered workshop or rehabilitation facility.
(d) "Employer" includes any person regularly employing five or more persons, or
any person acting as an agent of an employer, directly or indirectly, the state or any
political or civil subdivision of the state, and cities, except as follows:
"Employer" does not include a religious association or corporation not organized
for private profit.
(e) "Employment agency" includes any person undertaking for compensation to
procure employees or opportunities to work.
(f) "Essential functions" means the fundamenta l job duties of the employment
position the individual with a disability holds or desires. "Essential functions" does not
include the marginal functions of the position.
(1) A job function may be considered essential for any of several reasons,
including, but not limited to, any one or more of the following:
41
(A) The function may be essential because the reason the position exists is to
perform that function.
(B) The function may be essential because of the limited number of employees
available among whom the performance of that job function can be distributed.
(C) The function may be highly specialized, so that the incumbent in the position
is hired for his or her expertise or ability to perform the particular function.
(2) Evidence of whether a particular function is essential includes, but is not
limited to, the following:
(A) The employer's judgment as to which functions are essential.
(B) Written job descriptions prepared before advertising or interviewing applicants
for the job.
(C) The amount of time spent on the job performing the function.
(D) The consequences of not requiring the incumbent to perform the function.
(E) The terms of a collective bargaining agreement.
(F) The work experiences of past incumbents in the job.
(G) The current work experience of incumbents in similar jobs.
(g) "Labor organization" includes any organization that exists and is constitut ed for
the purpose, in whole or in part, of collective bargaining or of dealing with employers
concerning grievances, terms or conditions of employment, or of other mutual aid or
protection.
(h) "Medical condition" means either of the following:
(1) Any health impairment related to or associated with a diagnosis of
cancer or a record or history of cancer.
(2) Genetic characteristics. For purposes of this section, "genetic
characteristics" means either of the following:
(A) Any scientifically or medically identifiable gene or chromosome, or
combination or alteration thereof, that is known to be a cause of a disease or disorder in
a person or his or her offspring, or that is determined to be associated with a statistically
increased risk of development of a disease or disorder, and that is presently not
associated with any symptoms of any disease or disorder.
42
(B) Inherited characteristics that may derive from the individual or family member,
that are known to be a cause of a disease or disorder in a person or his or her offspring,
or that are determined to be associated with a statistically increased risk of development
of a disease or disorder, and that are presently not associated with any symptoms of
any disease or disorder.
(i) "Mental disability" includes, but is not limited to, all of the following:
(1) Having any mental or psychological disorder or condition, such as
mental retardation, organic brain syndrome, emotional or mental illness, or specific
learning disabilities, that limits a major life activity. For purposes of this section:
(A) "Limits" shall be determined without regard to mitigating measures, such as
medications, assistive devices, or reasonable accommodations, unless the mitigating
measure itself limits a major life activity.
(B) A mental or psychological disorder or condition limits a major life activity if it
makes the achievement of the major life activity difficult.
(C) "Major life activities" shall be broadly construed and shall include physical,
mental, and social activities and working.
(2) Any other mental or psychological disorder or condition not described
in paragraph (1) that requires special education or related services.
(3) Having a record or history of a mental or psychological disorder or
condition described in paragraph (1) or (2), which is known to the employer or other
entity covered by this part.
(4) Being regarded or treated by the employer or other entity covered by
this part as having, or having had, any mental condition that makes achievement of a
major life activity difficult.
(5) Being regarded or treated by the employer or other entity covered by
this part as having, or having had, a mental or psychological disorder or condition that
has no present disabling effect, but that may become a mental disability as described in
paragraph (1) or (2).
"Mental disability" does not include sexual behavior disorders, compulsive
gambling, kleptomania, pyromania, or psychoactive substance use disorders resulting
from the current unlawful use of controlled substances or other drugs.
(j) "On the bases enumerated in this part" means or refers to discrimination on the
basis of one or more of the following: race, religious creed, color, national origin,
43
ancestry, physical disability, mental disability, medical condition, marital status, sex,
age, or sexual orientation.
(k) "Physical disability" includes, but is not limited to, all of the following:
(1) Having any physiological disease, disorder, condition, cosmetic disfigurement,
or anatomical loss that does both of the following:
(A) Affects one or more of the following body systems: neurological,
immunological, musculoskeletal, special sense organs, respiratory, including speech
organs, cardiovascular, reproductive, digestive, genitourinary, hemic and lymphatic,
skin, and endocrine.
(B) Limits a major life activity. For purposes of this section:
(i) "Limits" shall be determined without regard to mitigating measures such as
medications, assistive devices, prosthetics, or reasonable accommodations, unless the
mitigating measure itself limits a major life activity.
(ii) A physiological disease, disorder, condition, cosmetic disfigurement, or
anatomical loss limits a major life activity if it makes the achievement of the major life
activity difficult.
(iii) "Major life activities" shall be broadly construed and includes physical,
mental, and social activities and working.
(2) Any other health impairment not described in paragraph (1) that
requires special education or related services.
(3) Having a record or history of a disease, disorder, condition, cosmetic
disfigurement, anatomical loss, or health impairment described in paragraph (1) or (2),
which is known to the employer or other entity covered by this part.
(4) Being regarded or treated by the employer or other entity covered by
this part as having, or having had, any physical condition that makes achievement of a
major life activity difficult.
(5) Being regarded or treated by the employer or other entity covered by
this part as having, or having had, a disease, disorder, condition, cosmetic
disfigurement, anatomical loss, or health impairment that has no present disabling effect
but may become a physical disability as described in paragraph (1) or (2).
(6) "Physical disability" does not include sexual behavior disorders,
compulsive gambling, kleptomania, pyromania, or psychoactive substance use
44
disorders resulting from the current unlawful use of controlled substances or other
drugs.
(l) Notwithstanding subdivisions (i) and (k), if the definition of "disability" used in the
Americans with Disabilities Act of 1990 (Public Law 101-336) would result in broader
protection of the civil rights of individuals with a mental disability or physical disability, as
defined in subdivision (i) or (k), or would include any medical condition not included
within those definitions, then that broader protection or coverage shall be deemed
incorporated by reference into, and shall prevail over conflicting provisions of, the
definitions in subdivisions (i) and (k).
(m) "Race, religious creed, color, national origin, ancestry, physical disability,
mental disability, medical condition, marital status, sex, age, or sexual orientation"
includes a perception that the person has any of those characteristics or that the person
is associated with a person who has, or is perceived to have, any of those
characteristics.
(n) "Reasonable accommodation" may include either of the following:
(1) Making existing facilities used by employees readily accessible to, and
usable by, individuals with disabilities.
(2) Job restructuring, part-time or modified work schedules, reassignment
to a vacant position, acquisition or modification of equipment or devices, adjustment or
modifications of examinations, training materials or policies, the provision of qualified
readers or interpreters, and other similar accommodations for individuals with
disabilities.
(o) "Religious creed," "religion," "religious observance," "religious belief," and
"creed" include all aspects of religious belief, observance, and practice.
(p) "Sex" includes, but is not limited to, pregnancy, childbirth, or medical conditions
related to pregnancy or childbirth. "Sex" also includes, but is not limited to, a person's
gender, as defined in Section 422.56 of the Penal Code.
(q) "Sexual orientation" means heterosexuality, homosexuality, and bisexuality.
(r) "Supervisor" means any individual having the authority, in the interest of the
employer, to hire, transfer, suspend, lay off, recall, promote, discharge, assign, reward,
or discipline other employees, or the responsibility to direct them, or to adjust the ir
grievances, or effectively to recommend that action, if, in connection with the foregoing,
the exercise of that authority is not of a merely routine or clerical nature, but requires the
use of independent judgment.
45
(s) "Undue hardship" means an action requiring significant difficulty or expense,
when considered in light of the following factors:
(1) The nature and cost of the accommodation needed.
(2) The overall financial resources of the facilities involved in the provision
of the reasonable accommodations, the number of persons employed at the facility, and
the effect on expenses and resources or the impact otherwise of these accommodations
upon the operation of the facility.
(3) The overall financial resources of the covered entity, the overall size of
the business of a covered entity with respect to the number of employees, and the
number, type, and location of its facilities.
(4) The type of operations, including the composition, structure, and
functions of the workforce of the entity.
(5) The geographic separateness, administrative, or fiscal relationship of
the facility or facilities.
HISTORY:
Added Stats 1980 ch 992 § 4. Amended Stats 1985 ch 1151 § 1; Stats 1990 ch 15 §
1 (SB 1027); Stats 1992 ch 911 § 3 (AB 311), ch 912 § 3 (AB 1286), ch 913 § 21.3 (AB
1077); Stats 1993 ch 1214 § 5 (AB 551); Stats 1998 ch 99 § 1 (SB 654); Stats 1999 ch
311 § 2 (SB 1185), ch 591 § 5.1 (AB 1670), ch 592 § 3.7 (AB 1001); Stats 2000 ch 1049
§ 5 (AB 2222); Stats 2003 ch 164 § 1 (AB 196); Stats 2004 ch 700 § 4 (SB 1234).
Amendments:
1985 Amendment:
Added (1) "or her" after "employed by his" in subd (b); and (2) subd (i).
1990 Amendment:
Added subd (j).
1992 Amendment:
(1) Added subd (a); (2) redesignated former subds (a)-(d) to be subds (b)-(e); (3)
amended the introductory clause of subd (d) by (a) deleting ", except as hereinafter
provided," before "includes"; and (b) substituting ", except as follows:" for a period; (4)
added subdivision designation (d)(1); (5) added subd (d)(2); (6) added subd (f); (7)
redesignated former subdivisions (e) and (f) to be subds (g) and (h); (8) substituted
"includes, but is not limited to," for "means" in subd (h); (9) added subd (i); (10)
46
redesignated former subd (g) to be subd (j); (11) substituted "disability, mental disability"
for "handicap" in subd (j); (12) substituted subd (k) for former subd (h) which read: "(h)
'Physical handicap' includes impairment of sight, hearing, or speech, or impairment of
physical ability because of amputation or loss of function or coordination, or any other
health impairment which requires special education or related services."; (13) added
subds (l) and (m); (14) redesignated former subds (i) and (j) to be subds (n) and (o); and
(15) added subd (p) and the last paragraph. (As amended 1992 ch 913, compared to
the section as it read prior to 1992. This section was also amended by two earlier
chapters, ch 911, ch 912. See Gov C § 9605.)
1993 Amendment:
(1) Substituted "functions" for "duties" after "Essential" both times it appears in subd
(f); (2) deleted ", but is not limited to," after "includes" in subd (h); (3) deleted former
subd (l) which read: "(l) 'Reasonable accommodation' may include either of the
following:
"(1) Making existing facilities used by employees readily accessible to, and usable
by, individuals with disabilities.
"(2) Job restructuring, part-time or modified work schedules, reassignment to a
vacant position, acquisition or modification of equipment or devices, adjustment or
modifications of examinations, training materials or policies, the provision of qualified
readers or interpreters, and other similar accommodations for individuals with
disabilities. It is the intent of the Legislature that the definition of 'physical disability' in
this subdivision shall have the same meaning as the term 'physical handicap' formerly
defined by this subdivision and construed in American National Ins. Co. v. Fair
Employment & Housing Com., 32 Cal. 3d 603. However, 'physical disability' does not
include conditions excluded from the federal definition of 'disability' pursuant to Section
511 of the Americans with Disabilities Act of 1990 (42 U.S.C., § 12211). Additionally, for
purposes of this part, the unlawful use of controlled substances or other drugs shall not
be deemed, in and of itself, to constitute a physical disability."; (4) designated the former
last paragraph in the section to be subd (l); and (5) substituted "of" for "or" after "size of
the business" in subd (p)(3).
1998 Amendment:
(1) Amended subd (d) by (a) substituting the comma after "indirectly" for the
semicolon; and (b) adding the comma after "thereof"; (2) substituted "that" for "which"
after "organization" in subd (g); (3) amended subd (h) by adding (a) "(1) genetic
characteristics, or (2)" after "include" in the first sentence; and (b) the second sentence;
and (4) added "and" before "(5) the geographic" in subd (p).
47
1999 Amendment:
(1) Amended subd (d) by (a) substituting "of the state" for "thereof" in the
introductory clause; (b) deleting subdivision designation (d)(1) at the beginning of the
second paragraph; and (c) deleting former subd (d)(2) which read: "(2) 'Employer,' for
purposes of provisions defining unlawful employment practices related to mental
disability, means any person regularly employing 15 or more persons, or any person
directly or indirectly acting as an agent of such an employer, and also includes the state
and municipalities and political subdivisions of the state ."; (2) substituted subd (h) for
former subd (h) which read: "(h) 'Medical condition' includes (1) genetic characteristics,
or (2) any health impairment related to or associated with a diagnosis of cancer, for
which a person has been rehabilitated or cured, based on competent medical evidence.
For purposes of this section, 'genetic characteristics' means any scientifically or
medically identifiable gene or chromosome, or combination or alteration thereof, that is
known to be a cause of a disease or disorder in a person or his or her offspring, or is
determined to be associated with a statistically increased risk of development of a
disease or disorder, or inherited characteristics that may derive from the individual or
family member, that is presently not associated with any symptoms of any disease or
order."; (3) substituted "or age" at the end of subd (j); (4) added subd (m); (5)
redesignated former subds (m)-(o) to be subds (n)-(p); (6) added subds (q) and (r); and
(7) redesignated former subd (p) to be subd (s). (As amended Stats 1999 ch 592,
compared to the section as it read prior to 1999. This section was also amended by two
earlier chapters, ch 311 and ch 591. See Gov C § 9605.)
2000 Amendment:
(1) Amended subd (h) by (a) adding "means" in the introductory clause; and (b)
substituting "cancer or a record or history of cancer" for ", for which a person has been
rehabilitated or cured, based on competent medical evidence" in subd (h)(1); (2)
substituted subd (i) for former subd (i) which read: "(i) 'Mental disability' includes any
mental or psychological disorder, such as mental retardation, organic brain syndrome,
emotional or mental illness, and specific learning disabilities. However, 'mental disability'
does not include conditions excluded from the federal definition of 'disability' pursuant to
Section 511 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12211).
Additionally, for purposes of this part, the unlawful use of controlled substances or other
drugs shall not be deemed, in and of itself, to constitute a mental disability."; and (3)
substituted subd (k) for former subd (k) which read: "(k) 'Physical disability' includes, but
is not limited to, all of the following:
"(1) Having any physiological disease, disorder, condition, cosmetic
disfigurement, or anatomical loss that does both of the following:
48
"(A) Affects one or more of the following body systems: neurological, immunological,
musculoskeletal, special sense organs, respiratory, including speech organs,
cardiovascular, reproductive, digestive, genitourinary, hemic and lymphatic, skin, and
endocrine.
"(B) Limits an individual's ability to participate in major life activities.
"(2) Any other healthy impairment not described in paragraph (1) that requires
special education or related services.
"(3) Being regarded as having or having had a disease, disorder, condition,
cosmetic disfigurement, anatomical loss, or health impairment described in
paragraph (1) and (2).
"(4) Being regarded as having, or having had, a disease, disorder, condition,
cosmetic disfigurement, anatomical loss, or health impairment that has no
present disabling effect but may become a physical disability as described in
paragraph (1) or (2).
"It is the intent of the Legislature that the definition of 'physical disability' in this
subdivision shall have the same meaning as the term 'physical handicap' formerly
defined by this subdivision and construed in American National Ins. Co. v. Fair
Employment & Housing Com. (1982) 32 Cal. 3d 603. However, 'physical disability' does
not include conditions excluded from the federal definition of 'disability' pursuant to
Section 511 of the Americans with Disabilities Act of 1990 (42 U.S.C., Sec 12211).
Additionally, for purposes of this part, the unlawful use of controlled substances or other
drugs shall not be deemed, in and of itself, to constitute a physical disability."
2003 Amendment:
(1) Added the second sentence of subd (p); and (2) amended subd (s) by
substituting (a) "The" for "the" at the beginning of subds (s)(1)-(s)(5); and (b) the period
for the comma at the end of subds (s)(1)-(s)(3) and the period for ", and" at the end of
subd (s)(4).
2004 Amendment:
Substituted "Section 422.56 of the Penal Code" for "Section 422.76 of the Penal
Code, except that, for purposes of this part, the reference in that definition to the "victim"
shall mean the employee or applicant and the reference in that definition to the
49
"defendant" shall mean the employer or other covered entity or person subject to
applicable prohibitions under this part" in subd (p).
50
Appendix D
The City of Vernon
Notice of Compliance Under ADA & California State Law
In accordance with the requirements of Title II of the Americans with Disabilities Act
(ADA) of 1990, the Americans with Disabilities Amendments Act of 2008, the Fair
Employment & Housing Act (FEHA), California Government Code Section 11135 and
other applicable codes, the City of Vernon does not discriminate against individuals on
the basis of disability in its services, programs or activities.
Employment: the City of Vernon does not discriminate on the basis of disability in its
hiring or employment practices and will comply with the Fair Employment and Housing
Act, as well as Title I of the ADA, including the regulations promulgated by the U.S.
Equal Employment Opportunity Commission (EEOC), including the requirement to
provide reasonable accommodations.
Effective Communication: the City of Vernon will generally, upon request, provide
appropriate aids and services leading to effective communication for qu alified persons
with disabilities, including sign language interpreters, documents in Braille and other
alternate formats to ensure information and communication is accessible to people who
have speech, hearing, vision, or cognitive impairments so they can participate equally in
the programs, services and activities.
Modification to Policies and Procedures: the City of Vernon will make reasonable
modifications to policies and programs to ensure that people with disabilities have an
equal opportunity to participate in all of its programs, services and activities. For
example, individuals with service animals behaving within applicable standards are
welcome in offices and City facilities, even when pets are generally prohibited.
Anyone who requires auxiliary aids and services for effective communication, or a
modification of policies or procedures to participate in a program, service or activity in
the City of Vernon should communicate with the Disability Manager contact as soon as
possible, but no later than 72 hours before the scheduled event.
Neither the ADA, nor state law requires the City of Vernon to take action that would
51
fundamentally alter the nature of its programs, activities or services or impose an undue
financial or administrative burden. Complaints that a program, activity or service of the
City of Vernon is not accessible should be directed to:
Director of Human Resources
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
(323) 583-8811
The City of Vernon will not place a surcharge on a particular individual with a disability
or a group of individuals with disabilities to cover the cost of providing auxiliary aids and
services or making a reasonable modification to a policy to create access.
52
Appendix E
The City of Vernon
ADA Notice Dissemination Plan
Title II of the ADA, 28 CFR 35.1069 requires that the City of Vernon produce and disseminate a
notice of their ADA compliance.
The notice should be written clearly without undue complication. It should discuss what ADA
requirements the entity is held to, the name of the ADA Coordinator, and provide current contact
information enabling an individual to contact the ADA Coordinator. The notice should cover
areas regarding:
-Employment;
-Effective Communication;
-Making reasonable modification to policies and programs;
-An explanation of the non-surcharge requirement concerning the provision of auxiliary
aids and services; and
-Information regarding the grievance process.
In considering how to disseminate this document, the City should identify the impacted parties
who would have an interest in the notice. The notice dissemination plan should address the
frequency of notice dissemination. Methods of dissemination may include:
-The City’s website;
- Local Newspaper(s);
-City Publications;
-Posters on City facilities;
-Inclusion of notice for special activities;
-Within transportation systems provided by the City;
-Within City Programs and Services meetings and materials; and
-Other forms in which impacted stakeholders might be present.
Not all of the above notice dissemination methodologies may be necessary to effectively
disseminate the notice.
928 CFR 35.106 Notice: A public entity shall make available to applicants, participants, beneficiaries,
and other interested persons information regarding the provisions of this part and its applicability to
the services, programs, or activities of the public entity, and make such information available to them
in such manner as the head of the entity finds necessary to apprise such persons of the protections
against discrimination assured them by the Act and this part.
53
Appendix F
Grievance Procedure under ADA or
California State Disability Civil Rights Laws
This grievance procedure is established to meet the requirements of the Americans with
Disabilities Act of 1990 (“ADA”), the Americans with Disabilities Amendments Act
(ADAAA) and California State law. It may be used by anyone wishing to file a complaint
alleging discrimination on the basis of disability in the provision of services, activities,
programs or benefits by the City of Vernon. The City’s Disability Discrimination Policy
governs employment-related complaints of disability discrimination.
The complaint should be in writing and contain information about the alleged
discrimination such as name, address, phone number of the complainant and location,
date and a description of the problem(s). The City currently does not have an ADA
Grievance Form. In Appendix G, there is a sample ADA Grievance Form that the City
will adopt after the December 15, 2020 City Council Meeting. Alternative means of filing
a complaint, such as personal interviews or a tape recording of the complaint, are
available to persons with disabilities upon request.
The complaint should be submitted by the grievant and/or his/her d esignee as soon as
possible, but no later than 60 calendar days after the alleged violation to:
54
Director of Human Resources
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
(323) 583-8811
Appendix G
ADA Grievance Form (Sample)
ADA Title II Grievance Form
Instructions: Please fill out as much of this form as you can in black ink or type. If you need
assistance, tell us and we would be happy to provide assistance with filling out this form. Sign
and return (mail, fax or e-mail) to the following information listed below.
Name:
Address:
City:
State:
Zip Code:
Telephone (Home):
Telephone (Business):
Telephone (Mobile):
E-Mail:
Person (if other than the grievant) alleging Violation of Title II of the Americans with Disabilities
Act:
Address:
City:
State:
Zip Code:
Telephone (Home):
Telephone (Business):
Telephone (Mobile):
COMPLAINT
55
Access issues generally fall into one of three categories, please indicate which category
best describes your issue.
Physical/Architectural Access – Is the issue related to a physical barrier, for
example, a wheelchair ramp is needed, counters are too high for wheelchair users,
missing braille signage, etc.
Programmatic Access – Is the issue related to being able to participate in a
program, service or activity. For example, is there a City policy, practice, and/or
procedure that you allege does not provide an equally effective opportunity for persons
with disabilities to participate in or benefit from the City’s programs and services.
Communication Access – Is the issue related to communication, for example do
you need auxiliary aids and services, a sign language interpreter, Communication
Access Real-Time Translation (CART) materials in alternative formats in order to have
equal access to information and communication with a City Department’s programs,
services or activities.
City Department, Bureau or Service:
Address:
City:
State:
Zip Code:
Telephone:
When did the alleged violation occur?
Describe the alleged act(s) of discrimination, providing name(s) where possible of the
individuals who allegedly violated Title II:
Has this complaint been filed with the Department of Justice or any other Federal, State,
or local civil rights agency or court?
If yes, please complete the following information below.
Agency or Court:
Contact Person:
56
Address:
City:
State:
Zip Code:
Telephone:
Date Filed:
Additional space for description of alleged act of violation:
Strict confidentiality of all complaint information will be maintained. Sharing of
information will be done only as needed to resolve the complaint.
Signature:
Date:
57
Appendix H
Contact Information for the City of Vernon Risk Management/Disability Manager:
Director of Human Resources
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
(323) 583-8811
58
Appendix I - Surveys
Finance Treasury
Printed Communications
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
59
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
3. Has your Department identified local resources that can p rovide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is captioned,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after they have been
released?
5. Does your Department have a policy in place for securing video remote interpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
6. If your Department has a Public Information Officer that communicates with the press
and releases critical information, is an American Sign Language interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
60
Is there anything else you'd like to add regarding your Department's communication with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
61
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding your Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to you r Project Manager.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non -discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to request
reasonable accommodation?
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how often it is offered, and ho w
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manager.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of the job with
or without reasonable accommodations?
62
7. How are the essential functions of a position determined?
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the ADA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or emp loyees to request a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this process is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
63
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
14. If reasonable modifications are used to create access, are they approved before
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documented to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
64
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training regarding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Project Manager.
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installation
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you c onsider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
3. When furniture is purchased, does the Department consider accessibility fa ctors such
as is knee clearance for tables and clear space within a room?
65
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not placed
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Public Meetings
1. Does the Department hold or sponsor events that are available to the public? (If yes,
please complete this section. If no, please skip to the next section).
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this checklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with disabilities?
3a. If yes, please provide a copy of this training to your Project Manager.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and recorded.
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to respond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and public telephones; and
seating) is evaluated and implemented.
66
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals are
welcome?
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck microphone
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people who use wheelchairs?
13a. Does this reserved seating also include integrated companion seating?
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
67
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for person s needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that peop le with disabilities are able to
participate in public speaking at all events, e.g. public comment?
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
18b. If training is provided, please provide a copy of that training to your Project
Manager.
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
68
19a. If events include displays, are the displays accessible and on an accessible route?
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
Emergency Procedures
1. Does your Department have procedures in place regarding the evacuation of persons
with disabilities?
1a. If yes, please provide a copy of those procedures to your Project Manager.
1b. If yes, how often are relevant Department staff trained on those procedures, and
how is this training tracked and recorded?
1c. If staff are trained on these procedures, how often is this training updated and/or
reviewed?
2. Does your Department utilize Department vehicles for transporting civilians in any
instance, including emergency evacuation incidents?
2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please
describe in detail, if applicable).
2b. If yes, are relevant Department staff trained in how to transport persons with
disabilities? (Please describe in detail, if applicable).
3. Does your Department work in partnership with other entities regarding the set up
and administration of evacuation shelters or centers?
3a. If yes, please describe the Department’s role in this partnership.
3b. If yes, does the Department have a checklist regarding accessibility at evacuation
shelters or centers?
3c. Please provide a copy of this checklist, if applicable, to your Project Manager.
Records
1. In what format does your Department maintain records that are available to the
public? (e.g. hard copy, digital).
69
2. How does your Department ensure that digital records are fully accessible to persons
with disabilities?
3. Does your Department permit members of the public to visit your facility or facilities to
physically examine hard copies (printed) records?
3a. If yes, how does your Department ensure that public records’ examination areas are
accessible to persons with disabilities?
4. Does your Department offer assistance to persons with disabilities with regard to
public records services, e.g. filing, requesting documents, reviewing documents?
4a. If so, please describe the assistance you offer, including how this assistance is
publicized and how the public may make a request for assistance.
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these services are fully accessible.
4. Does your Department offer transportation services?
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
5a. If yes, are they accessible to people with disabilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
70
7a. If yes, how do you ensure that people with disabilities are able to access the
information included on these documents (e.g. persons who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessib ility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
11a. If yes, please describe how these were resolved.
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a re habilitation
program?
12a. If yes, when was it last updated?
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Does your Department purchase software for use by employees or the public?
13a. If so, how does your Department ensure that this software is accessible?
14. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
14a. If yes, please list any areas where you think training may be beneficial.
71
Fire
Printed Communications
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
72
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
3. Has your Department identified local resources that can provide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is caption ed,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after they have been
released?
5. Does your Department have a policy in place for securing video remote interpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
6. If your Department has a Public Information Officer that communicates with the pre ss
and releases critical information, is an American Sign Language interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
Is there anything else you'd like to add regarding your Department's communication with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
73
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
74
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding your Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to your Project Manager.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non -discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to request
reasonable accommodation?
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how o ften it is offered, and how
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manager.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of the job with
or without reasonable accommodations?
7. How are the essential functions of a position determined?
75
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the ADA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or employees to request a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this process is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
76
14. If reasonable modifications are used to create access, are they approved before
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documented to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
77
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training regarding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Project Manager.
Purchasing, Contracts, Vendors
1. When the purchase of new equipment is made, (purchases including, but not limite d
to, communication and transportation equipment) is it reviewed to ensure the equipment
is accessible to users with disabilities?
1a. If yes, please describe how accessibility reviews of new equipment are performed.
2. Are all public documents related to bidding and contracting available to persons with
disabilities in alternative format if needed?
3. Are meetings related to bidding and contracting held in accessible locations?
4. Do all City contracts have language in place holding contractors and vendors to
applicable State and Federal disability civil rights mandates?
4a. If yes, how is this enforced?
5. How does the Department ensure that all products and services offered by third
parties and vendors are fully accessible?
6. Is an accessibility plan check done when vendors are conducting tenant
improvements in public service areas?
7. Is guidance in place for staff and vendors regarding clear space and furniture
placement?
7a. If yes, when was it last updated?
7b. If yes, please provide a copy of the guidance documentation to your Project
Manager.
78
8. If an employee or member of the public with a disability believes they have been
discriminated against by a County vendor or contractor, what steps are available to
them to remedy their concerns?
Construction and Remodels
1. Do all design contracts hold design professionals to designs that use, at minimum,
the most stringent access standards in effect at the time of the project?
2. Do design contracts encourage design professionals to exceed the maximum access
standards when possible to ensure that construction tolerances are built into the
project? Please describe.
3. Is a policy in place that mandates Certified Access Specialist (CASp) inspections at
key points of construction and at completion, before final payment is made?
3a. If yes, please provide a copy of the policy documentation to your Project Manager.
4. Are major public projects reviewed by stakeholders with disabilities during the
planning stage?
4a. If yes, please describe how these reviews are con ducted.
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installation
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you consider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
79
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
3. When furniture is purchased, does the Department consider accessibility factors such
as is knee clearance for tables and clear space within a room?
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not placed
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Facilities and Real Estate Management
1. Does your Department ensure accessibility of any public rights of way (PRoW)?
1a. If yes, please describe how your Department achieves this, including accessibility
requirements of sidewalks, parking lots, paths of travel to and from Department
facilities.
1b. If yes, please provide a copy of any policies and/or Department procedures to your
Project Manager, and include information on when these were last updated.
1c. If yes, please describe how the Department monitors PRoW for accessibility issues,
including but not limited to broken sidewalks, PRoW obstructions (including temporary
obstructions), and overhangs into the PRoW that interfere with clear head space.
1d. If yes, does your Department receive complaints from the public regarding
inaccessible PRoW? How does the Department ensure that methods for receiving these
complaints (e.g. via telephone, web-based forms, email) are accessible to people with
disabilities?
2. Does your Department have an accessibility construction inspection checklist for use
by building code officials/building inspectors as a reference guide to assist with on -site
inspection of accessibility features and construction elements affecting acce ssibility
compliance to your facilities?
2a. If yes, when was it last updated?
2b. If yes, please provide a copy of the checklist to your Project Manager.
3. Is there a policy and/or procedure in place ensuring proper maintenance of
accessible features?
3a. If yes, when was this last updated?
80
3b. If yes, how are the relevant staff made aware of these policies and procedures?
3c. If yes, how are these policies and/or procedures enforced?
3d. If yes, please provide a copy of the policy and procedure to your Project Manager.
Fleet Services
1. Does your Department utilize vehicles for transportation? (If yes, continue with this
section; if no, please skip this section.)
2. When procuring and maintaining vehicles for transportation uses, what procedures
and/or guidelines does your Department follow or implement to ensure that these
vehicles are accessible to persons with disabilities?
3. Does your Department offer training to transportation providers regarding disability
awareness and how to ensure access and safety to riders with disabilities (including the
use of tie-downs)?
3a. If yes, please describe the training.
3b. If yes, please provide a copy of the training to your Project Manager.
3c. If yes, please describe how often this training is offered, tracked and recorded.
3d. If no, is there another Department within the City that offers this training?
4. Are service animals allowed on transportation systems?
5. Have there been any complaints regarding inaccessible transportation services?
5a. If yes, how were those resolved?
Public Meetings
1. Does the Department hold or sponsor events that are available to the public? (If yes,
please complete this section. If no, please skip to the next section).
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this checklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with disabilities?
81
3a. If yes, please provide a copy of this training to your Project Manager.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and recorded.
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to respond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and public telephones; and
seating) is evaluated and implemented.
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals are
welcome?
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck microphone
82
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people who use wheelchairs?
13a. Does this reserved seating also include integrated companion seating?
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for persons needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that people with disabilities are able to
participate in public speaking at all events, e.g. public comment?
83
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
18b. If training is provided, please provide a copy of that training to your Project
Manager.
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
19a. If events include displays, are the displays accessible and on an accessible route?
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
Emergency Procedures
1. Does your Department have procedures in place regarding the evacuation of persons
with disabilities?
1a. If yes, please provide a copy of those procedures to your Project Manager.
1b. If yes, how often are relevant Department staff trained on those procedures, and
how is this training tracked and recorded?
1c. If staff are trained on these procedures, how often is this training updated and/or
reviewed?
84
2. Does your Department utilize Department vehicles for transporting civilians in any
instance, including emergency evacuation incidents?
2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please
describe in detail, if applicable).
2b. If yes, are relevant Department staff trained in how to transport persons with
disabilities? (Please describe in detail, if applicable).
3. Does your Department work in partnership with other entities regarding the set up
and administration of evacuation shelters or centers?
3a. If yes, please describe the Department’s role in this partnership.
3b. If yes, does the Department have a checklist regarding accessibility at evacuation
shelters or centers?
3c. Please provide a copy of this checklist, if applicable, to your Project Manager.
Records
1. In what format does your Department maintain records that are available to the
public? (e.g. hard copy, digital).
2. How does your Department ensure that digital records are fully accessible to persons
with disabilities?
3. Does your Department permit members of the public to visit your facility or facilities to
physically examine hard copies (printed) records?
3a. If yes, how does your Department ensure that public records’ examination areas are
accessible to persons with disabilities?
4. Does your Department offer assistance to persons with disabilities with regard to
public records services, e.g. filing, requesting documents, reviewing documents?
4a. If so, please describe the assistance you offer, including how this assistance is
publicized and how the public may make a request for assistance.
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
85
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these services are fully accessible.
4. Does your Department offer transportation services?
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
5a. If yes, are they accessible to people with disab ilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
7a. If yes, how do you ensure that people with disabilities are able to access the
information included on these documents (e.g. person s who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessibility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
86
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
11a. If yes, please describe how these were resolved.
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a rehabilitation
program?
12a. If yes, when was it last updated?
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
13a. If yes, please list any areas where you think training may be beneficial.
Health
Printed Communications
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
87
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
3. Has your Department identified local resources that can provide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is captioned,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after they have been
released?
5. Does your Department have a policy in place for securing video remote interpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
88
6. If your Department has a Public Information Officer that communicates with the press
and releases critical information, is an American Sign Language interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
Is there anything else you'd like to add regarding your Department's communication with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
89
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding you r Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to your Project Manager.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non-discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to r equest
reasonable accommodation?
90
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how often it is offered, and how
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manager.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of the job with
or without reasonable accommodations?
7. How are the essential functions of a position determined?
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the ADA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or employees to request a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
91
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this process is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
14. If reasonable modifications are used to create access, are they approved before
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documented to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
92
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training rega rding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Project Manager.
Purchasing, Contracts, Vendors
1. When the purchase of new equipment is made, (purchases including, but not limited
to, communication and transportation equipment) is it reviewed to ensure the equipment
is accessible to users with disabilities?
1a. If yes, please describe how accessibility reviews of new equipment are performed.
2. Are all public documents related to bidding and contracting available to persons with
disabilities in alternative format if needed?
3. Are meetings related to bidding and contracting held in accessible locations?
93
4. Do all City contracts have language in place holding contractors and vendors to
applicable State and Federal disability civil rights mandates?
4a. If yes, how is this enforced?
5. How does the Department ensure that all products and services offered by third
parties and vendors are fully accessible?
6. Is an accessibility plan check done when vendors are conducting tenant
improvements in public service areas?
7. Is guidance in place for staff and vendors regarding clear space and furniture
placement?
7a. If yes, when was it last updated?
7b. If yes, please provide a copy of the guidance documentation to your Project
Manager.
8. If an employee or member of the public with a disability believes they have been
discriminated against by a County vendor or contractor, what steps are available to
them to remedy their concerns?
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installation
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you con sider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
94
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
3. When furniture is purchased, does the Department consider accessibility fact ors such
as is knee clearance for tables and clear space within a room?
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not placed
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Facilities and Real Estate Management
1. Does your Department ensure accessibility of any public rights of way (PRoW)?
1a. If yes, please describe how your Department achieves this, including accessibility
requirements of sidewalks, parking lots, paths of travel to and from Department
facilities.
1b. If yes, please provide a copy of any policies and/or Department procedures to your
Project Manager, and include information on when these were last updated.
1c. If yes, please describe how the Department monitors PRoW for accessibility issues,
including but not limited to broken sidewalks, PRoW obstructions (including temporary
obstructions), and overhangs into the PRoW that interfere with clear head space.
1d. If yes, does your Department receive complaints from the public regarding
inaccessible PRoW? How does the Department ensure that methods for receiving these
complaints (e.g. via telephone, web-based forms, email) are accessible to people with
disabilities?
2. Does your Department have an accessibility construction inspection checklist for use
by building code officials/building inspectors as a reference guide to assist with on -site
inspection of accessibility features and construction elements affecting accessibility
compliance to your facilities?
2a. If yes, when was it last updated?
2b. If yes, please provide a copy of the checklist to your Project Manager.
3. Is there a policy and/or procedure in place ensuring proper maintenance of
accessible features?
3a. If yes, when was this last updated?
95
3b. If yes, how are the relevant staff made aware of these policies and procedures?
3c. If yes, how are these policies and/or procedures enforced?
3d. If yes, please provide a copy of the policy and procedure to your Project Manager.
Health
1. Is the Department responsible for ensuring access to necessary medical care for
persons with special needs, i.e. disabilities?
1a. If yes, please describe how Department achieves this, and include copies of any
relevant policies, procedures, and guidelines.
2. How does the Department protect the environment and ensuring the health and
safety of its residents, workers, visitors and neighboring communities?
3. For any emergency preparedness programs administered by the Department, do
these programs include special considerations or guidance for persons with disabilities?
3a. If yes, please describe these emergency preparedness programs.
3b. If yes, please provide any programmatic documentation to your Project Manager.
Fleet Services
1. Does your Department utilize vehicles for transportation? (If yes, continue with this
section; if no, please skip this section.)
2. When procuring and maintaining vehicles for transportation uses, what procedures
and/or guidelines does your Department follow or implement to ensure that these
vehicles are accessible to persons with disabilities?
3. Does your Department offer training to transportation providers regarding disability
awareness and how to ensure access and safety to riders with disabilities (including the
use of tie-downs)?
3a. If yes, please describe the training.
3b. If yes, please provide a copy of the training to your Project Manager.
3c. If yes, please describe how often this training is offered, tracked and recorded.
3d. If no, is there another Department within the City that offers this training?
4. Are service animals allowed on transportation systems?
96
5. Have there been any complaints regarding inaccessible transportation services?
5a. If yes, how were those resolved?
Public Meetings
1. Does the Department hold or sponsor events that are available to the public? (If yes,
please complete this section. If no, please skip to the next section).
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this che cklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with disabilities?
3a. If yes, please provide a copy of this training to your Project Mana ger.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and recorded.
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to respond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and public telephones; and
seating) is evaluated and implemented.
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
97
7. Are the indoor or outdoor surfaces where persons with d isabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals a re
welcome?
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck microphone
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people who use wheelchairs?
13a. Does this reserved seating also include integrated companion seating?
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
98
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for persons needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that people with disabilities are able to
participate in public speaking at all events, e.g. public comment?
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
18b. If training is provided, please provide a copy of that training to your Project
Manager.
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
19a. If events include displays, are the displays accessible and on an accessible route?
99
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
Emergency Procedures
1. Does your Department have procedures in place regarding the evacuation of persons
with disabilities?
1a. If yes, please provide a copy of those procedures to your Project Manager.
1b. If yes, how often are relevant Department staff trained on those procedures, and
how is this training tracked and recorded?
1c. If staff are trained on these procedures, how often is this training updated and/or
reviewed?
2. Does your Department utilize Department vehicles for transporting civilians in any
instance, including emergency evacuation incidents?
2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please
describe in detail, if applicable).
2b. If yes, are relevant Department staff trained in how to transport persons with
disabilities? (Please describe in detail, if applicable).
3. Does your Department work in partnership with other entities regarding the set up
and administration of evacuation shelters or centers?
3a. If yes, please describe the Department’s role in this partnership.
3b. If yes, does the Department have a checklist rega rding accessibility at evacuation
shelters or centers?
3c. Please provide a copy of this checklist, if applicable, to your Project Manager.
Records
1. In what format does your Department maintain records that are available to the
public? (e.g. hard copy, digital).
2. How does your Department ensure that digital records are fully accessible to persons
with disabilities?
100
3. Does your Department permit members of the public to visit your facility or facilities to
physically examine hard copies (printed) records?
3a. If yes, how does your Department ensure that public records’ examination areas are
accessible to persons with disabilities?
4. Does your Department offer assistance to persons with disabilities with regard to
public records services, e.g. filing, requesting documents, reviewing documents?
4a. If so, please describe the assistance you offer, including how this assistance is
publicized and how the public may make a request for assistance.
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these services are fully accessible.
4. Does your Department offer transportation services?
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
5a. If yes, are they accessible to people with disabilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
101
7a. If yes, how do you ensure that people with disabilities are able to access the
information included on these documents (e.g. persons who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessibility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
11a. If yes, please describe how these were resolved.
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a rehabilitation
program?
12a. If yes, when was it last updated?
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
13a. If yes, please list any areas where you think training m ay be beneficial.
HR
Printed Communications
102
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
103
3. Has your Department identified local resources that can provide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is captioned,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after they have been
released?
5. Does your Department have a policy in place for securing video remote inte rpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
6. If your Department has a Public Information Officer that communicate s with the press
and releases critical information, is an American Sign Language interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiti ng rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
Is there anything else you'd like to add regarding your Department's communication with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
104
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
105
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding your Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to your Project Manager.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non -discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to request
reasonable accommodation?
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how often it is offered, and how
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manager.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of the job with
or without reasonable accommodations?
7. How are the essential functions of a position determined?
106
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the A DA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or employees to request a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this proce ss is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
107
14. If reasonable modifications are used to create access, are they approved before
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documente d to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
108
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training regarding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Pr oject Manager.
Purchasing, Contracts, Vendors
1. When the purchase of new equipment is made, (purchases including, but not limited
to, communication and transportation equipment) is it reviewed to ensure the equipment
is accessible to users with disabilities?
1a. If yes, please describe how accessibility reviews of new equipment are performed.
2. Are all public documents related to bidding and contracting available to persons with
disabilities in alternative format if needed?
3. Are meetings related to bidding and contracting held in accessible locations?
4. Do all City contracts have language in place holding contractors and vendors to
applicable State and Federal disability civil rights mandates?
4a. If yes, how is this enforced?
5. How does the Department ensure that all products and services offered by third
parties and vendors are fully accessible?
6. Is an accessibility plan check done when vendors are conducting tenant
improvements in public service areas?
7. Is guidance in place for staff and vendors regarding clear space and furniture
placement?
7a. If yes, when was it last updated?
7b. If yes, please provide a copy of the guidance documentation to your Project
Manager.
109
8. If an employee or member of the public with a disability believes they have bee n
discriminated against by a County vendor or contractor, what steps are available to
them to remedy their concerns?
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installation
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you consider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
3. When furniture is purchased, does the Department consider accessibility factors such
as is knee clearance for tables and clear space within a room?
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not placed
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Facilities and Real Estate Management
1. Does your Department ensure accessibility of any public rights of way (PRoW)?
1a. If yes, please describe how your Department achieves this, including accessibility
requirements of sidewalks, parking lots, paths of travel to and from Department
facilities.
110
1b. If yes, please provide a copy of any policies and/o r Department procedures to your
Project Manager, and include information on when these were last updated.
1c. If yes, please describe how the Department monitors PRoW for accessibility issues,
including but not limited to broken sidewalks, PRoW obstruction s (including temporary
obstructions), and overhangs into the PRoW that interfere with clear head space.
1d. If yes, does your Department receive complaints from the public regarding
inaccessible PRoW? How does the Department ensure that methods for receivi ng these
complaints (e.g. via telephone, web-based forms, email) are accessible to people with
disabilities?
2. Does your Department have an accessibility construction inspection checklist for use
by building code officials/building inspectors as a reference guide to assist with on-site
inspection of accessibility features and construction elements affecting accessibility
compliance to your facilities?
2a. If yes, when was it last updated?
2b. If yes, please provide a copy of the checklist to your Project Manager.
3. Is there a policy and/or procedure in place ensuring proper maintenance of
accessible features?
3a. If yes, when was this last updated?
3b. If yes, how are the relevant staff made aware of these policies and procedures?
3c. If yes, how are these policies and/or procedures enforced?
3d. If yes, please provide a copy of the policy and procedure to your Project Manager.
Planning, Construction, Buildings
1. When examining plans, does the Department evaluate accessibility requirements?
1a. If yes, please describe how the Department does this, and please attach any
relevant Departmental documentation (e.g. guidelines, checklists, procedures).
2. During construction, does the Department evaluate construction sites for accessible
paths of travel along public rights of way for persons with disabilities?
2a. If yes, please describe how the Department does this.
2b. If yes, please send any relevant Departmental documentation (e.g. guidelines,
checklists, procedures) to your Project Manager.
111
3. Does the Department receive public complaints regarding building accessibility for
persons with disabilities?
3a. If yes, please describe how these are submitted to the Department by the public.
3b. If yes, please provide examples of complaints, including how those were resolved.
3c. If yes, please provide any relevant Departmental documentation, including intake
forms, internal processes, etc.) to your Project Manager.
4. Does the Department have any staff or employees who evaluate accessibility of built
environments for persons with disabilities?
4a. If yes, please provide supplemental information, e.g. # of FTEs, certifications
required, job description(s).
Public Meetings
1. Does the Department hold or sponsor events that are available to the public? (I f yes,
please complete this section. If no, please skip to the next section).
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this checklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with di sabilities?
3a. If yes, please provide a copy of this training to your Project Manager.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and recorded.
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to respond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
112
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and public telephones; and
seating) is evaluated and implemented.
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals are
welcome?
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck microphone
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people who use wheelchairs?
13a. Does this reserved seating also include integrated companion seating?
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
113
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for persons needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that people with disabilities are able to
participate in public speaking at all events, e.g. public comment?
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
114
18b. If training is provided, please provide a cop y of that training to your Project
Manager.
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
19a. If events include displays, are the displays accessible and on an accessible route?
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
Emergency Procedures
1. Does your Department have procedures in place regarding the evacuation of persons
with disabilities?
1a. If yes, please provide a copy of those procedures to your Project Manager.
1b. If yes, how often are relevant Department staff trained on those procedures, and
how is this training tracked and recorded?
1c. If staff are trained on these procedures, how often is this training updated and/or
reviewed?
2. Does your Department utilize Department vehicles for transporting civilians in any
instance, including emergency evacuation incidents?
2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please
describe in detail, if applicable).
2b. If yes, are relevant Department staff trained in how to transport persons with
disabilities? (Please describe in detail, if applicable).
3. Does your Department work in partnership with other entities regarding the set up
and administration of evacuation shelters or centers?
3a. If yes, please describe the Department’s role in this partnership.
115
3b. If yes, does the Department have a checklist regarding accessibility at evacuation
shelters or centers?
3c. Please provide a copy of this checklist, if applicable, to your Project Manager.
Records
1. In what format does your Department maintain records that are available to the
public? (e.g. hard copy, digital).
2. How does your Department ensure that digital records are fully accessible to persons
with disabilities?
3. Does your Department permit members of the public to visit your facility or facilities to
physically examine hard copies (printed) records?
3a. If yes, how does your Department ensure that public records’ examination areas are
accessible to persons with disabilities?
4. Does your Department offer assistance to persons with disabilities with regard to
public records services, e.g. filing, requesting documents, reviewing documents?
4a. If so, please describe the assistance you offer, including how this assistance is
publicized and how the public may make a request for assistance.
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these services are fully accessible.
4. Does your Department offer transportation services?
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
116
5a. If yes, are they accessible to people with disabilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
7a. If yes, how do you ensure that people with disabilities a re able to access the
information included on these documents (e.g. persons who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessibility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
11a. If yes, please describe how these were resolved.
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a rehabilitation
program?
12a. If yes, when was it last updated?
117
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Does your Department purchase software for use by employees or the public?
13a. If so, how does your Department ensure that this software is accessible?
14. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
14a. If yes, please list any areas where you think training may be beneficial.
118
IT
Printed Communications
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
119
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
3. Has your Department identified local resources that can provide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is captioned,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after they have been
released?
5. Does your Department have a policy in place for securing video remote interpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
6. If your Department has a Public Information Officer that communicates with the p ress
and releases critical information, is an American Sign Language interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
Is there anything else you'd like to add regarding your Department's communication with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
120
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
121
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding your Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to your Project Manager.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non-discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to request
reasonable accommodation?
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how often it is offered, and how
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manager.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of the job with
or without reasonable accommodations?
7. How are the essential functions of a position determined?
122
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the ADA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or employees to request a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this process is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
123
14. If reasonable modifications are used to create access, are they approved before
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documented to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
124
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training regarding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Project Manager.
Information Technology (IT)
1. How does IT ensure that all Information & Communication Technology services within
its purview are fully accessible?
2. How does IT ensure that all mobile applications developed on your behalf are fully
accessible?
3. What version of the Web Content Accessibility Guidelines (WCAG) does IT apply in
software development?
4. Have you ever received any complaints regarding a lack of digital / web accessibility
by any of your employees, volunteers, users?
4a. If yes, please describe, and include how these complaints were resolved.
5. How and how often does IT conduct accessibility checks, and how encompassing are
these checks?
6. Does the IT Department offer and/or receive regular training regarding digital and
web accessibility?
6a. If yes, please describe the training, provide copies of any relevant documents, and
describe how training is tracked and recorded.
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installati on
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
125
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you consider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
3. When furniture is purchased, does the Department consider accessibility factors such
as is knee clearance for tables and clear space within a room?
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not placed
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Public Meetings
1. Does the Department hold or sponsor events that are availab le to the public? (If yes,
please complete this section. If no, please skip to the next section).
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this checklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with disabilities?
3a. If yes, please provide a copy of this training to your Project Manager.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and record ed.
126
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to respond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and public telephones; and
seating) is evaluated and implemented.
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals are
welcome?
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck microphone
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people wh o use wheelchairs?
127
13a. Does this reserved seating also include integrated companion seating?
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for persons needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that people with disabilities are able to
participate in public speaking at all events, e.g. public comment?
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
128
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
18b. If training is provided, please provide a copy of that training to your Project
Manager.
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
19a. If events include displays, are the displays accessible and on an accessible route?
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these services are fully accessible.
4. Does your Department offer transportation services?
129
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
5a. If yes, are they accessible to people with disabilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
7a. If yes, how do you ensure that people with disabilities a re able to access the
information included on these documents (e.g. persons who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessibility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
11a. If yes, please describe how these were resolved.
130
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a rehabilitation
program?
12a. If yes, when was it last updated?
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
13a. If yes, please list any areas where you think training may be beneficial.
131
Police
Printed Communications
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
132
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
3. Has your Department identified local resources that can provide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is captioned,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after the y have been
released?
5. Does your Department have a policy in place for securing video remote interpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
6. If your Department has a Public Information Officer that communicates with the press
and releases critical information, is an American Sign Language interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
Is there anything else you'd like to add regarding your Department's communication with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
133
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
134
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding your Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to your Project Manager.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non -discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to request
reasonable accommodation?
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how often it is offered, and how
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manage r.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of the job with
or without reasonable accommodations?
7. How are the essential functions of a position determined?
135
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the ADA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or employees to request a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this process is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
136
14. If reasonable modifications are used to create access, are they approved before
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documented to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
137
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training regarding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Project Manager.
Purchasing, Contracts, Vendors
1. When the purchase of new equipment is made, (purchases including, but not limited
to, communication and transportation equipment) is it reviewed to ensure the equipment
is accessible to users with disabilities?
1a. If yes, please describe how accessibility reviews of new equipment are performed.
2. Are all public documents related to bidding and contracting available to persons with
disabilities in alternative format if needed?
3. Are meetings related to bidding and contracting held in accessible locations?
4. Do all City contracts have language in place holding contractors and vendors to
applicable State and Federal disability civil rights mandates?
4a. If yes, how is this enforced?
5. How does the Department ensure that all products and services offered by third
parties and vendors are fully accessible?
6. Is an accessibility plan check done when vendors are conducting tenant
improvements in public service areas?
7. Is guidance in place for staff and vendors regarding clear space and furniture
placement?
7a. If yes, when was it last updated?
7b. If yes, please provide a copy of the guidance documentation to your Project
Manager.
138
8. If an employee or member of the public with a disability believes they have been
discriminated against by a County vendor or contractor, what steps are available to
them to remedy their concerns?
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installation
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you consider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
3. When furniture is purchased, does the Department consider accessibility factors such
as is knee clearance for tables and clear space within a room?
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not pl aced
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Facilities and Real Estate Management
1. Does your Department ensure accessibility of any public rights of way (PRoW)?
1a. If yes, please describe how your Department achieves this, including accessibility
requirements of sidewalks, parking lots, paths of travel to and from Department
facilities.
139
1b. If yes, please provide a copy of any policies and/or Department procedures to your
Project Manager, and include information on when these were last updated.
1c. If yes, please describe how the Department monitors PRoW for accessibility issues,
including but not limited to broken sidewalks, PRoW obstructions (including temporary
obstructions), and overhangs into the PRoW that interfere with clear head space.
1d. If yes, does your Department receive complaints from the public regarding
inaccessible PRoW? How does the Department ensure that methods for receiving these
complaints (e.g. via telephone, web-based forms, email) are accessible to people with
disabilities?
2. Does your Department have an accessibility construction inspection checklist for use
by building code officials/building inspectors as a reference guide to assist with on-site
inspection of accessibility features and construction elements affecting accessibility
compliance to your facilities?
2a. If yes, when was it last updated?
2b. If yes, please provide a copy of the checklist to your Project Manager.
3. Is there a policy and/or procedure in place ensuring proper maintenance of
accessible features?
3a. If yes, when was this last updated?
3b. If yes, how are the relevant staff made aware of these policies and procedures?
3c. If yes, how are these policies and/or procedures enforced?
3d. If yes, please provide a copy of the policy and procedure to your Project Manager.
Fleet Services
1. Does your Department utilize vehicles for transportation? (If yes, continue with this
section; if no, please skip this section.)
2. When procuring and maintaining vehicles for transportation uses, what procedures
and/or guidelines does your Department follow or implement to ensure that these
vehicles are accessible to persons with disabilities?
3. Does your Department offer training to transportation providers regarding disability
awareness and how to ensure access and safety to riders with disabilities (including the
use of tie-downs)?
3a. If yes, please describe the training.
140
3b. If yes, please provide a copy of the training to your Project Manager.
3c. If yes, please describe how often this training is offered, tracked and recorded.
3d. If no, is there another Department within the City that offers this training?
4. Are service animals allowed on transportation systems?
5. Have there been any complaints regarding inaccessible transportation services?
5a. If yes, how were those resolved?
Public Meetings
1. Does the Department hold or sponsor events that are available to the public? (If yes,
please complete this section. If no, please skip to the next section).
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this checklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with disabilities?
3a. If yes, please provide a copy of this training to your Project Manager.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and recorded.
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to re spond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
141
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and public telephones; and
seating) is evaluated and implemented.
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals are
welcome?
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck micro phone
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people who use wheelchairs?
13a. Does this reserved seating also include integrated companion seating?
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
142
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for persons needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that people with disabilities are able to
participate in public speaking at all events, e.g. public comment?
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
18b. If training is provided, please provide a copy of that training to your Project
Manager.
143
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
19a. If events include displays, are the displays accessible and on an accessible route?
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
Emergency Procedures
1. Does your Department have procedures in place regarding the evacuation of persons
with disabilities?
1a. If yes, please provide a copy of those procedures to your Project Manager.
1b. If yes, how often are relevant Department staff trained on those procedures, and
how is this training tracked and recorded?
1c. If staff are trained on these procedures, how often is this training updated and/or
reviewed?
2. Does your Department utilize Department vehicles for transporting civilians in any
instance, including emergency evacuation incidents?
2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please
describe in detail, if applicable).
2b. If yes, are relevant Department staff trained in how to transport persons with
disabilities? (Please describe in detail, if applicable).
3. Does your Department work in partnership with other entities regarding the set up
and administration of evacuation shelters or centers?
3a. If yes, please describe the Department’s role in this partnership.
3b. If yes, does the Department have a checklist regarding accessibility at evacuation
shelters or centers?
3c. Please provide a copy of this checklist, if applicable, to your Project Manager.
144
Custody
1. Have the Department’s first responders been trained regarding the disability civil
rights mandates that the County is held to under State and Federal laws?
2. Have holding and booking areas been reviewed for access since the 2010 ADA
Standards for Accessible Design became effective?
2a. If visitor areas are offered, are they accessible?
3. If inmate phone systems are provided, is there a phone system for inmates who are
deaf or hard of hearing?
4a. When arrests are made how are service animals dealt with?
4b. When arrests are made, how are medical appliances (canes, walkers, hearing aids,
oxygen tanks, etc.) addressed?
4c. When arrests are made, how are power wheelchairs, scooters and other large
mobility devices transported after an arrest?
4d. When arrests are made, how are medication needs handled?
5. When an officer is giving information (direction or Miranda Rights) to a person with a
communication related limitation, how is it determined that the person understands the
information being communicated?
6. How do officers communicate with persons who are deaf?
7. Does the 911 system have TTY?
7a. If yes, how often is it tested and does training occur regarding its use?
8. Is there a procedure in place for officers to obtain a sign language interpreter when
one is needed on an emergency basis?
9 Have officers been trained regarding the best techniques for communication with
persons with disabilities and officer safety?
10. Are there other issues you feel should be addressed in dealing with disability civil
rights and your role within the City of Vernon? If yes, please explain.
Records
1. In what format does your Department maintain records that are available to the
public? (e.g. hard copy, digital).
145
2. How does your Department ensure that digital records are fully accessible to persons
with disabilities?
3. Does your Department permit members of the public to visit your facility or facilities to
physically examine hard copies (printed) records?
3a. If yes, how does your Department ensure that public records’ examination areas are
accessible to persons with disabilities?
4. Does your Department offer assistance to persons with disabilities with regard to
public records services, e.g. filing, requesting documents, reviewing documents?
4a. If so, please describe the assistance you offer, including how this assistance is
publicized and how the public may make a request for assistance.
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these services are fully accessible.
4. Does your Department offer transportation services?
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
5a. If yes, are they accessible to people with disabilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
146
7a. If yes, how do you ensure that people with disabilities are able to access the
information included on these documents (e.g. persons who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessibility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
11a. If yes, please describe how these were resolved.
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a rehabilitation
program?
12a. If yes, when was it last updated?
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
13a. If yes, please list any areas where you think training may be beneficial.
147
Public Utilities
Printed Communications
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
148
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
3. Has your Department identified local resources that can provide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is captioned,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after they have been
released?
5. Does your Department have a policy in place for securing video remote interpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
6. If your Department has a Public Information Officer that communicates with the press
and releases critical information, is an American Sign Language interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
Is there anything else you'd like to add regarding your Department's communication with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
149
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
150
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding your Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to your Project Man ager.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non -discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to request
reasonable accommodation?
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how often it is offered, and how
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manager.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of t he job with
or without reasonable accommodations?
7. How are the essential functions of a position determined?
151
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the ADA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or employees to reque st a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this process is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
152
14. If reasonable modifications are used to create access, are they approved befo re
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documented to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
153
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training regarding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Project Manager.
Purchasing, Contracts, Vendors
1. When the purchase of new equipment is made, (purchases including, but not limited
to, communication and transportation equipment) is it reviewed to ensure the equipment
is accessible to users with disabilities?
1a. If yes, please describe how accessibility reviews of new equipment are performed.
2. Are all public documents related to bidding and contracting available to persons w ith
disabilities in alternative format if needed?
3. Are meetings related to bidding and contracting held in accessible locations?
4. Do all City contracts have language in place holding contractors and vendors to
applicable State and Federal disability civil rights mandates?
4a. If yes, how is this enforced?
5. How does the Department ensure that all products and services offered by third
parties and vendors are fully accessible?
6. Is an accessibility plan check done when vendors are conducting tenant
improvements in public service areas?
7. Is guidance in place for staff and vendors regarding clear space and furniture
placement?
7a. If yes, when was it last updated?
7b. If yes, please provide a copy of the guidance documentation to your Project
Manager.
154
8. If an employee or member of the public with a disability believes they have been
discriminated against by a County vendor or contractor, what steps are available to
them to remedy their concerns?
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installation
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you consider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
3. When furniture is purchased, does the Department consider accessibility factors such
as is knee clearance for tables and clear space within a room?
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not placed
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Facilities and Real Estate Management
1. Does your Department ensure accessibility of any public rights of way (PRoW)?
1a. If yes, please describe how your Department achieves this, including accessibility
requirements of sidewalks, parking lots, paths of travel to and from Department
facilities.
155
1b. If yes, please provide a copy of any policies and/or Department procedures to your
Project Manager, and include information on when these were last updated.
1c. If yes, please describe how the Department monitors PRoW for accessibility issues,
including but not limited to broken sidewalks, PRoW obstructions (including temporary
obstructions), and overhangs into the PRoW that interfere with clear head space.
1d. If yes, does your Department receive complaints from the public regarding
inaccessible PRoW? How does the Department ensure that methods for receiving these
complaints (e.g. via telephone, web-based forms, email) are accessible to people with
disabilities?
2. Does your Department have an accessibility construction inspection checklist for use
by building code officials/building inspectors as a reference guide to assist with on -site
inspection of accessibility features and construction elements affecting a ccessibility
compliance to your facilities?
2a. If yes, when was it last updated?
2b. If yes, please provide a copy of the checklist to your Project Manager.
3. Is there a policy and/or procedure in place ensuring proper maintenance of
accessible features?
3a. If yes, when was this last updated?
3b. If yes, how are the relevant staff made aware of these policies and procedures?
3c. If yes, how are these policies and/or procedures enforced?
3d. If yes, please provide a copy of the policy and procedure to your Project Manager.
Planning, Construction, Buildings
1. When examining plans, does the Department evaluate accessibility requirements?
1a. If yes, please describe how the Department does this, and please attach any
relevant Departmental documentation (e.g. guidelines, checklists, procedures).
2. During construction, does the Department evaluate construction sites for accessible
paths of travel along public rights of way for persons with disabilities?
2a. If yes, please describe how the Department does this.
2b. If yes, please send any relevant Departmental documentation (e.g. guidelines,
checklists, procedures) to your Project Manager.
156
3. Does the Department receive public complaints regarding building accessibility for
persons with disabilities?
3a. If yes, please describe how these are submitted to the Department by the public.
3b. If yes, please provide examples of complaints, including how those were resolved.
3c. If yes, please provide any relevant Departmental documentation, including in take
forms, internal processes, etc.) to your Project Manager.
4. Does the Department have any staff or employees who evaluate accessibility of built
environments for persons with disabilities?
4a. If yes, please provide supplemental information, e.g. # of FTEs, certifications
required, job description(s).
Fleet Services
1. Does your Department utilize vehicles for transportation? (If yes, continue with this
section; if no, please skip this section.)
2. When procuring and maintaining vehicles for transportation uses, what procedures
and/or guidelines does your Department follow or implement to ensure that these
vehicles are accessible to persons with disabilities?
3. Does your Department offer training to transportation providers regarding disability
awareness and how to ensure access and safety to riders with disabilities (including the
use of tie-downs)?
3a. If yes, please describe the training.
3b. If yes, please provide a copy of the training to your Project Manager.
3c. If yes, please describe how often this training is offered, tracked and recorded.
3d. If no, is there another Department within the City that offers this training?
4. Are service animals allowed on transportation systems?
5. Have there been any complaints regarding inaccessible transportation services?
5a. If yes, how were those resolved?
Public Meetings
1. Does the Department hold or sponsor events that are available to the public? (If yes,
please complete this section. If no, please skip to the next section).
157
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this checklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with disabilities?
3a. If yes, please provide a copy of this training to your Project Manager.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and recorded.
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to respond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and pub lic telephones; and
seating) is evaluated and implemented.
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals are
welcome?
158
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck microphone
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people who use wheelchairs?
13a. Does this reserved seating also include integrated companion seating?
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for persons needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
159
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that people with disabilities are able to
participate in public speaking at all events, e.g. public comment?
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
18b. If training is provided, please provide a copy of that training to your Project
Manager.
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
19a. If events include displays, are the displays accessible and on an accessible route?
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
Records
160
1. In what format does your Department maintain records that are available to the
public? (e.g. hard copy, digital).
2. How does your Department ensure that digital records are fully accessible to persons
with disabilities?
3. Does your Department permit members of the public to visit your facility or facilities to
physically examine hard copies (printed) records?
3a. If yes, how does your Department ensure that public records’ examination areas are
accessible to persons with disabilities?
4. Does your Department offer assistance to persons with disabilities with regard to
public records services, e.g. filing, requesting documents, reviewing documents?
4a. If so, please describe the assistance you offer, including how this assistance is
publicized and how the public may make a request for assistance.
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these service s are fully accessible.
4. Does your Department offer transportation services?
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
5a. If yes, are they accessible to people with disabilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
161
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
7a. If yes, how do you ensure that people with disabilities are able to access the
information included on these documents (e.g. persons who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessibility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
11a. If yes, please describe how these were resolved.
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a rehabilitation
program?
12a. If yes, when was it last updated?
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
162
13a. If yes, please list any areas where you think training may be beneficial.
163
Public Works
Printed Communications
1. Do all of your Department’s printed publications and notices inform readers that the
publications are available in alternative formats, if needed, for persons with disabilities?
1a. If yes, is this mandated by the City or specific to your Department?
1b. If yes, is the notification language standard to the City or created by your
Department?
1c. If yes, please provide a copy of the text offering alternative formats.
2. Do all of your Department’s printed publications and notices use a certain font type
and size for City published documents?
2a. If yes, what font type and size is used?
2b. If yes, is this mandated by the City or specific to your Department?
3. Has your Department reviewed all publications and notices to determine whether they
portray persons with disabilities in a demeaning or offensive manner?
3a. If yes, when was this review last performed?
3b. If yes, how regularly is this review performed?
4. Has your Department trained its staff to ensure that all publications and
correspondence use “person first language”?
4a. If yes, is this training provided by the City or the Department?
4b. If yes, how often are staff provided this training, and how is this training tracked and
recorded? (type "N/A" if not applicable)
Is there anything else you'd like to add regarding your Department's printed
communication?
Communication With People Who are Deaf or Hard of Hearing (DHH)
1. Does your Department list “711 the California Relay” on business cards and
letterheads?
2. Are your Department’s telephone lines accessible to persons who are DHH?
2a. If yes, please describe how the Department ensures this accessibility.
164
2b. If yes, how often are your Department’s telephone lines tested to ensure
accessibility?
3. Has your Department identified local resources that can provide auxiliary aids for
communication as needed?
3a. If yes, please describe.
3b. If yes, please describe how the public is informed of these resources, and how they
are informed on how to request them.
4. If your Department uses video for any reason or in any forum (e.g. internal employee
training, public outreach via the web on social media, YouTube, etc.) is that video
captioned?
4a. If yes, please describe how the Department ensures that video is captioned,
including any processes or vendors utilized to caption videos.
4b. If yes, are videos captioned before use, or at some later date after they have been
released?
5. Does your Department have a policy in place for securing video remote interpreting
services (VRI)?
5a. If yes, please provide a copy of the policy to your Project Manager.
5b. If yes, (but there is no written policy to be uploaded) please describe in detail.
6. If your Department has a Public Information Officer that communicates with the press
and releases critical information, is an American Sign Lang uage interpreter visible and
within the screenshot if television cameras are in use or is a captioning service used?
7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for
the public?
7a. If so, are these videos captioned?
8. Does the Department use any public address systems?
8a. If so, how does the Department ensure that information broadcast by these systems
is available to people who may be DHH?
Is there anything else you'd like to add regarding your Department's communi cation with
people who are Deaf or Hard of Hearing?
Software & Digital Communication
165
1. Does the Department ensure that its webpage is accessible to persons with
disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g.
https://www.w3.org/WAI/standards-guidelines/wcag/)
1a. If yes, is this mandated by the City?
1b. If yes, how does the Department make sure its webpage meets the WCAG?
1c. If yes, what version of the WCAG does the Department apply to its webpage access
requirements?
2. Does the Department use any web-based forms for use internally or by the public?
2a. If yes, how does the Department ensure that these meet WCAG?
3. Does the Department use any internally-developed software, including mobile
applications and payment systems, either internally or externally?
3a. If yes, how does the Department ensure that these meet WCAG?
4. Does the Department use any third party software, including mobile applications and
payment systems, either internally or externally?
4a. If yes, how does the Department ensure that these meet WCAG?
5. Does the Department use any touch screen information systems for public
interaction?
5a. If yes, is there an independent operating system for persons with visual
impairments?
6. Does the Department offer any type of computer or digital device for use by the
public?
6a. If yes, are they equipped with software that makes them accessible to persons with
visual impairments?
6b. If yes, how does the Department ensure that these devices and the software on
them is accessible?
7. In email communications (both internal and external), does the Department ensure
that all communications – including attachments – comply with WCAG?
7a. Are PDFs checked for accessibility?
7b. Are PDFs also sent out as Word documents?
166
7c. Are all photos captioned with descriptive text?
Is there anything else you'd like to add regarding your Department's software and digital
communication?
Staff & Employees
1. Does the Department affirmatively recruit persons with disabilities for available
positions?
1a. If yes, please describe these efforts and outreach.
2. Does the Department ensure that all of its job listings are accessible to persons with
disabilities?
2a. If yes, please send any pertinent documents to your Project Manage r.
2b. If yes but there are no pertinent documents, please describe how this is done.
3. Do Department job listings contain a statement of non -discrimination against persons
with disabilities?
3a. If yes, please provide a the text of this statement and reference to policy or
supporting documents.
4. Does the Department offer candidates for employment the opportunity to request
reasonable accommodation?
4a. If yes, please send any pertinent documents to your Project Manager.
4b. If you attached documents, please describe those.
5. Are interview panel members trained regarding disability awareness and appropriate
interactions with people with disabilities?
5a. If yes, please describe the training, including how often it is offered, and how
attendance is tracked and recorded.
5b. If yes, please send any pertinent documents to your Project Manager.
6. When your department conducts employment interviews, is the decision to hire based
upon which candidate is best qualified to perform the essential functions of the job with
or without reasonable accommodations?
7. How are the essential functions of a position determined?
167
8. Does the Department offer Staff and Employees an opportunity to self-identify as a
person with a disability?
9. How does the Department ensure that all employee events (e.g. holiday parties), are
fully accessible?
10. Does the Department offer training on accessibility best practices and/or the ADA to
staff, employees and/or volunteers?
10a. If so, how often is this training offered?
10b. If so, is this training optional or mandatory?
10c. If so, how is attendance tracked and recorded?
10d. Please provide a copy of all training(s) to your Project Manager.
11. Does the Department ensure that all opportunities for advancement and education
are available and accessible to Staff and Employees who may have a disability? This
includes, but is not limited to certifications, workshops, trainings, conferences, meetings,
etc.
12. Does the Department have a process for its staff and/or employees to request a
reasonable accommodation?
12a. Please describe and/or attach copies (below) of any pertinent policies or
procedures.
12a continued (please send any pertinent policies or procedures to your Project
Manager)
12b. Please also fully describe the interactive process, as well as how documentation
regarding these processes are maintained.
13. Does the Department’s reasonable accommodation process include a search for
transfer into a vacant, funded role as an accommodation of last resort?
13a. If yes, please provide all Departmental documentation and guidance regarding this
process to your Project Manager.
13b. If yes, please describe in detail how this process is implemented, including how
long a search is conducted, and what criteria are utilized to determine whether a
transfer is appropriate and can be achieved.
13c. If yes, does the Department require persons seeking this reasonable
accommodation to compete for the vacant role?
168
14. If reasonable modifications are used to create access, are they appr oved before
they are put in place?
14a. If yes, by whom? Please include name and position.
15. When reasonable modifications are put in place, are they documented to ensure
staff implements them appropriately?
15a. If yes, how is the reasonable modification(s) documented? What information is
included in the documentation?
16. Does the Department ensure that it’s facilities and offices are fully accessible?
16a. If yes, please describe.
17. Is there an anti-disability harassment policy?
17a. If your Department has a written anti-disability harassment policy, please provide a
copy of that to your Project Manager.
17b. If yes, is it based upon zero tolerance or the legal definition of disability
harassment?
17c. If yes, how often is it disseminated to all staff?
18. Does your Department’s grievance system offer assistance to people with
disabilities who, due to their disability, are not able to independently complete the
grievance?
18a. Does your Department’s grievance system provide timelines when a complainant
can expect a result?
18b. Does your Department’s grievance system have a second level of review?
18b continued. If yes, please state the position responsible for a second level of review.
18c. Does your Department’s grievance system contain a notice regarding availability of
the grievance system in alternative formats: braille, large print, audio?
18d. Does your Department’s grievance system contain the name and contact
information of the ADA Coordinator?
19. Has your Department received any complaints or grievances regarding failure to
reasonably accommodate and/or lack of accessibility by candidates, employees, or
visitors to any of your offices?
169
19a. Please explain your answer to Question 19, above, including the resolution to any
complaints.
20. Does your Department supervise any maintenance staff?
20a. If yes, do maintenance staff receive training regarding maintaining an accessible
built environment?
21. Does the Department have a policy regarding service and/or support animals for its
employees?
21a. If yes, please provide a copy of the relevant policies to your Project Manager.
Purchasing, Contracts, Vendors
1. When the purchase of new equipment is made, (purchases including, but not limited
to, communication and transportation equipment) is it reviewed to ensure the equipment
is accessible to users with disabilities?
1a. If yes, please describe how accessibility reviews of new equipment are performed.
2. Are all public documents related to bidding and contracting available to persons with
disabilities in alternative format if needed?
3. Are meetings related to bidding and contracting held in accessible locations?
4. Do all City contracts have language in place holding contractors and vendors to
applicable State and Federal disability civil rights mandates?
4a. If yes, how is this enforced?
5. How does the Department ensure that all products and services offered by third
parties and vendors are fully accessible?
6. Is an accessibility plan check done when vendors are conducting tenant
improvements in public service areas?
7. Is guidance in place for staff and vendors regarding clear space and furniture
placement?
7a. If yes, when was it last updated?
7b. If yes, please provide a copy of the guidance documentation to your Project
Manager.
170
8. If an employee or member of the public with a disability believes they have been
discriminated against by a County vendor or contractor, what steps are available to
them to remedy their concerns?
Construction and Remodels
1. Do all design contracts hold design professionals to designs that use, at minimum,
the most stringent access standards in effect at the time of the project?
2. Do design contracts encourage design professionals to exceed the maximum access
standards when possible to ensure that construction tolerances are built into the
project? Please describe.
3. Is a policy in place that mandates Certified Access Specialist (CASp) inspections at
key points of construction and at completion, before final payment is made?
3a. If yes, please provide a copy of the policy documentation to your Project Manager.
4. Are major public projects reviewed by stakeholders with disabilities during the
planning stage?
General Purchases
1. When purchasing items for installation, what checks are in place to ensure installatio n
will be compliant with current building standards? (e.g. toilet paper dispensers must be
located below the grab bar; items may not protrude more than 4” from the wall in a path
of travel if they are placed at an elevation above 27” or below 80”; clear space available
for a wheelchair user to approach the item for use; an item must not require a person to
reach higher than 48” or lower than 15” to operate unless the user must reach over
other items to operate, etc.)
1b. Please describe how you ensure that purchased and installed items are maintained
so as to ensure current building standards (e.g. waste baskets are not kept in required
maneuvering clearances; subsequently installed items do not obstruct clear spaces and
reach ranges, etc.)
2. When purchasing an item that contains an operational part, do you consider
accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs
operational pressure; no grasping, pinching, and twisting; etc.)?
2a. If yes, please describe how these considerations are made and implemented.
2b. If yes, how does the Department ensure that any operable part is maintained to
remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part
accessibility requirements)?
171
3. When furniture is purchased, does the Department consider accessibility factors such
as is knee clearance for tables and clear space within a room?
3a. If yes, please describe how these considerations are made and implemented.
3b. If yes, please describe how these features are maintained (e.g. items are not placed
beneath tables which may obstruct knee clearances, or additional furniture is added to a
room which may obstruct clear space).
Facilities and Real Estate Management
1. Does your Department ensure accessibility of any public rights of way (PRoW)?
1a. If yes, please describe how your Department achieves this, including accessibility
requirements of sidewalks, parking lots, paths of travel to and from Department
facilities.
1b. If yes, please provide a copy of any policies and/or Department procedures to your
Project Manager, and include information on when these were last updated.
1c. If yes, please describe how the Department monitors PRoW for accessibility issues,
including but not limited to broken sidewalks, PRoW obstructions (including temporary
obstructions), and overhangs into the PRoW that interfere with clear head space.
1d. If yes, does your Department receive complaints from the public regarding
inaccessible PRoW? How does the Department ensure that methods for receiving these
complaints (e.g. via telephone, web-based forms, email) are accessible to people with
disabilities?
2. Does your Department have an accessibility construction inspection checklist for use
by building code officials/building inspectors as a reference guide to assist with on-site
inspection of accessibility features and construction elements affecting accessibility
compliance to your facilities?
2a. If yes, when was it last updated?
2b. If yes, please provide a copy of the checklist to your Project Manager.
3. Is there a policy and/or procedure in place ensuring proper maintenance of
accessible features?
3a. If yes, when was this last updated?
3b. If yes, how are the relevant staff made aware of these policies and procedures?
3c. If yes, how are these policies and/or procedures enforced?
172
3d. If yes, please provide a copy of the policy and procedure to your Project Manager.
Planning, Construction, Buildings
1. When examining plans, does the Department evaluate accessibility requirements?
1a. If yes, please describe how the Department does this, and please attach any
relevant Departmental documentation (e.g. guidelines, checklists, procedures).
2. During construction, does the Department evaluate construction sites for accessib le
paths of travel along public rights of way for persons with disabilities?
2a. If yes, please describe how the Department does this.
2b. If yes, please send any relevant Departmental documentation (e.g. guidelines,
checklists, procedures) to your Project Manager.
3. Does the Department receive public complaints regarding building accessibility for
persons with disabilities?
3a. If yes, please describe how these are submitted to the Department by the public.
3b. If yes, please provide examples of complaint s, including how those were resolved.
3c. If yes, please provide any relevant Departmental documentation, including intake
forms, internal processes, etc.) to your Project Manager.
4. Does the Department have any staff or employees who evaluate accessibility of built
environments for persons with disabilities?
4a. If yes, please provide supplemental information, e.g. # of FTEs, certifications
required, job description(s).
Capital Projects
1. Does your department have an accessibility checklist that it uses for all Capital
projects?
1a. If yes, please provide a copy of this checklist and/or any pertinent documentation to
your Project Manager.
1b. If yes, when was this last updated?
1c. If yes, how does your Department ensure that accessibility is implemented in all
Capital projects?
Fleet Services
173
1. Does your Department utilize vehicles for transportation? (If yes, continue with this
section; if no, please skip this section.)
2. When procuring and maintaining vehicles for transportation uses, what procedures
and/or guidelines does your Department follow or implement to ensure that these
vehicles are accessible to persons with disabilities?
3. Does your Department offer training to transportation providers regarding disabili ty
awareness and how to ensure access and safety to riders with disabilities (including the
use of tie-downs)?
3a. If yes, please describe the training.
3b. If yes, please provide a copy of the training to your Project Manager.
3c. If yes, please describe how often this training is offered, tracked and recorded.
3d. If no, is there another Department within the City that offers this training?
4. Are service animals allowed on transportation systems?
5. Have there been any complaints regarding inaccessible transportation services?
5a. If yes, how were those resolved?
Public Meetings
1. Does the Department hold or sponsor events that are available to the public? (If yes,
please complete this section. If no, please skip to the next section).
2. Does the Department have an event planning accessibility checklist to ensure that all
public meetings and events are fully accessible?
2a. If yes, please provide a copy of this checklist to your Project Manager.
2b. If yes, who maintains and updates this checklist?
3. If security checks are required to attend any public function, are security personnel
trained in best practices for conducting security checks for persons with disabilities?
3a. If yes, please provide a copy of this training to your Project Manager.
3b. If yes, please describe this training (if not uploaded), including how often it is
updated and offered, and how attendance is tracked and recorded.
4. Do all meeting notices contain an announcement that reasonable accommodations
are available for persons with disabilities as needed and/or upon request?
174
4a. If yes, please provide the text that is included in all notices of public meetings.
5. Are all persons who administer public meetings trained in how to respond to requests
for reasonable accommodations by members of the public?
5a. If yes, please describe what training is provided, including how often it is provided
and how attendance is tracked and recorded.
6. Does the Department take steps to ensure that all meetings are held in buildings and
rooms that are fully accessible?
6a. If so, please describe how the physical accessibility of public meeting spaces
(including: paths of travel; entrances; circulation routes; registration counters or tables;
building amenities such as water fountains, restrooms and public telephones; and
seating) is evaluated and implemented.
6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons
who use wheelchairs or service animals?
7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth,
stable and slip resistant?
8. Are public meetings held on sites that are accessible by public transportation?
8a. If no, please explain why not.
9. Do public meeting notices contain language indicating that service animals are
welcome?
9a. If yes, please provide the text of this notification.
10. Are service animal relief areas identified before every public meeting?
11. Are emergency exits identified before every public meeting?
12. Are stages, speaking platforms, microphones and other items to be used by persons
with disabilities accessible? (Note: When considering microphone access please take
into account podium elevations, touch screen control systems, gooseneck microphone
attached to the center of tables without knee clearance for wheelchair users, and
persons who will not be able to hand hold any equipment.)
13. Do all public meetings have reserved seating for people who use wheelchairs?
13a. Does this reserved seating also include integrated companion seating?
175
14. Are all presenters at public meetings trained on best practices for presenting content
to persons with disabilities, eg. reading powerpoints aloud?
14a. If yes, how and how often are these trainings offered, and how is attendance
tracked and recorded?
15. Are FM Loop systems (Assistive Listening Devices) available for persons who are
hard of hearing?
15a. If FM Loop systems are being used, do meeting hosts ensure that all comments
made during the meeting go through the PA system?
15b. If FM Loop systems are used, are all meeting hosts trained on how to operate
these?
15c. If FM Loop systems are used, are all meeting hosts trained on how to operate
these? How often, and how is this training tracked and recorded?
16. Are sign language interpreters and/or real-time captioners available for all public
meetings?
16a. If yes, please indicate how these resources are made known and available to the
public.
16b. If yes, is there reserved seating at the front of the room for persons needing these
accommodations?
16c. If yes, are sign language interpreters positioned beneath adequate lighting, and
close to the speaker?
16d. If yes, are two sign language interpreters retained for meetings or events lasting
more than two hours?
16e. If yes, are sign language interpreters and real time captioners provided information
before the meeting/event regarding any unusual terms or difficult to spell names that will
be part of the program?
17. What processes are in place to ensure that people with disabilities are able to
participate in public speaking at all events, e.g. public comment?
17a. If speaker cards are used, is staff available to assist persons with disabilities, as
needed, in completing the cards?
17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g.
lowered podiums, adjustable microphones, etc.)
176
17c. If public comment time is limited, is the time increased for persons who have
speech impairments?
18. Do any public events utilize security measures (e.g. magnometers, wands, bag
checks)?
18a. If yes, are Security personnel trained in best practices for conducting security
checks of persons with disabilities?
18b. If training is provided, please provide a copy of that training to your Project
Manager.
18c. If training is provided, please describe or provide a copy of that training, including
how and how often it is offered, and how attendance is tracked and recorded.
19. What processes are in place to ensure that exhibits, displays, and other materials
offered to the public are fully accessible?
19a. If events include displays, are the displays accessible and on an accessible route?
19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with
captioning used to display the exhibit?
19c. Are all brochure racks, holders and literature displays accessible to people with
disabilities, including, e.g. all materials on an accessible route, with appropriate reach
ranges and clear floor space?
Emergency Procedures
1. Does your Department have procedures in place regarding the evacuation of persons
with disabilities?
1a. If yes, please provide a copy of those procedures to your Project Manager.
1b. If yes, how often are relevant Department staff trained on those procedures, and
how is this training tracked and recorded?
1c. If staff are trained on these procedures, how often is this training updated and/or
reviewed?
2. Does your Department utilize Department vehicles for transporting civilians in any
instance, including emergency evacuation incidents?
2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please
describe in detail, if applicable).
177
2b. If yes, are relevant Department staff trained in how to transport persons with
disabilities? (Please describe in detail, if applicable).
3. Does your Department work in partnership with other entities regarding the set up
and administration of evacuation shelters or centers?
3a. If yes, please describe the Department’s role in this partnership.
3b. If yes, does the Department have a checklist regarding accessibility at evacuation
shelters or centers?
3c. Please provide a copy of this checklist, if applicable, to your Project Manager.
Records
1. In what format does your Department maintain records that are available to the
public? (e.g. hard copy, digital).
2. How does your Department ensure that digital records are fully accessible to persons
with disabilities?
3. Does your Department permit members of the public to visit your facility or facilities to
physically examine hard copies (printed) records?
3a. If yes, how does your Department ensure that public records’ examination areas are
accessible to persons with disabilities?
4. Does your Department offer assistance to persons with disabilities with regard to
public records services, e.g. filing, requesting documents, reviewing documents?
4a. If so, please describe the assistance you offer, including how this assistance is
publicized and how the public may make a request for assistance.
General
1. Does your Department have an ADA Notice of Compliance posted?
1a. If yes, please describe where this notice is posted.
2. Does your Department have any policies regarding service and/or emotional support
animals for its employees and/or the public?
2a. If yes, please provide a copy of any pertinent documentation to your Project
Manager.
3. If your Department offers public services on site, e.g. intake and counseling, please
describe how your Department ensures that these services are fully accessible.
178
4. Does your Department offer transportation services?
4a. If yes, please describe how the Department ensures that these services are fully
accessible to persons with disabilities.
5. Does your Department have electronic informational kiosks?
5a. If yes, are they accessible to people with disabilities?
6. Does your Department offer printed informational brochures to the public?
6a. If yes, are these offered in large print formats?
6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear
floor space and within reach ranges for persons who use mobility devices)?
7. Does your Department issue any warnings, penalties and/or citations?
7a. If yes, how do you ensure that people with disabilities are able to access the
information included on these documents (e.g. persons who may be blind or visually
impaired)?
8. Does your Department offer or host any trainings, meetings, or other events available
to the public?
8a. If yes, does your Department have a checklist to ensure accessibility?
8a (part two) please provide any checklist used to ensure accessibility at public events
to your Project Manager.
8b. If yes, are these events in accessible facilities?
8c. If yes, are these event facilities on public transportation routes?
9. Is your Department is involved in automation initiatives (e.g. web and mobile
applications) that interface with the public?
9a. If yes, how do you ensure that these are fully accessible to persons with disabilities?
10. How does your Department receive complaints of lack of accessibility or requests
for reasonable accommodation from the public?
10a. Please provide any pertinent policies and/or procedures to your Project Manager.
11. Has your Department received any complaints regarding a failure to reasonably
accommodate or lack of accessibility?
179
11a. If yes, please describe how these were resolved.
12. Does your Department have a policy in place that prohibits discrimination against
people who formerly used drugs illegally and have been through a rehabilitation
program?
12a. If yes, when was it last updated?
12b. If yes, please provide a copy of this policy to your Project Manager.
13. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
13a. If yes, please list any areas where you think training may be beneficial.
14. Based on all of the above question, are there areas where you feel training of
Department staff would be beneficial?
14a. If yes, please list any areas where you think training may be beneficial.
180
Appendix J
Documents appended to survey responses
181
Appendix K
Glossary of Terms and Basic information
The following glossary of terms is designed to give a basic overview of common
elements of access within the Americans with Disabilities Act, Title II, and California
State law. For more specific information concerning the terms described below please
review 28 CFR 35 and the California Government Code 12926.
Definition of Disability:
Under California State law, Government Code Section 12926, a person with a disability
is: 1) A person having a physical or mental impairment that limits a major life activity.
This limitation must be considered in the unmitigated status. This means that the
determination of whether the limitation exists would be considered in terms of how the
individual would function without the use of medication, personal devices or habits that
have been formed to mitigate the disability. 2). or, A person who has a record of a
disability, such as described in number one. 3). or, A person who is regarded as having
a disability, such as described in number one.
Note: This is an abridged definition of disability under California State law. For further
information, please see California Government Code 12926. The California definition of
disability is being used, as it is more stringent then the definition found under the
Americans with Disabilities Act of 1990 or the Americans with Disabilities Amendments
Act of 2008.
Qualified Person with a Disability
A qualified person with a disability has a disability as described above and is qualified to
receive the programs, services or activities of the entity in question.
Self-Evaluation
A comprehensive evaluation of all programs, services and activities to ensure that
access for qualified persons with disabilities is in place. The Self-Evaluation must be
vetted with interested stakeholders. The Self-Evaluation was due in 1993.
Transition Plan
A physical access evaluation of all sites from which programs, services and activities
are provided. The Transition Plan contains four parts: 1. A list of physical barriers; 2. A
statement of method to be utilized for mitigation of barriers; 3. A statement regarding the
schedule of barrier mitigation; and, 4. The designation an official who is responsible for
the administration of the Transition Plan. The Transition Plan was due in 1992. The
Transition Plan must be vetted with interested stakeholders.
Note: The intent was to create access within facilities that were online in 1992 and that
new construction or remodels would be accessible.
182
Program Access
A designated alternative manner in providing programs, services and activities in order
to ensure that appropriate access is in place. For example, accessible meeting space
may be secured on the ground floor of the building to hold meetings with people who
have mobility impairments, who are not able to go to the second floor because of the
absence of an elevator.
ADA Grievance Procedure
A grievance process that is published and capable of addressing issues that may arise
from access policies that impact the delivery of programs, services and activities. The
grievance procedure must be widely disseminated, offer a second level review, notify
the grievant of the outcome, state the ADA Coordinator's name and contact information
and offer assistance to a person with a disability who may not be able to complete the
grievance document independently due to their disability.
Notice of ADA Compliance
Notice of ADA Compliance is a widely disseminated notice that provides information
concerning the elements of ADA compliance that the entity has in place. It is
recommended that the Notice of ADA compliance be accompanied by a dissemination
plan.
ADA Coordinator
This position is required for state and local government entities that have 50 or more
employees. Initially, the position was envisioned to coordinate the grievance process.
The national trend is that this position is now used to coordinate a variety of matters
relative to ADA implementation and administration. Caution must be exercised
concerning an appropriate separation of duties. It is inappropriate to have the ADA
Coordinator engaged in both providing reasonable accommodations through the
interactive process, and investigating issues concerning the accommodations that have
been provided or denied.
Direct Threat
Direct threat is a significant risk of substantial harm that cannot be mitigated through
policy modification or reasonable accommodation. The danger must be rea l and not
speculative or remote.
Policy Modification Request and Fundamental Alteration
A qualified person with a disability may request that an entity modify its policies to
create an appropriate level of access. A system must be in place for entertainin g these
requests and determining whether said request would result in a fundamental alteration
of the programs, services and activities impacted. Should there be an inability to grant
the initial request, other measures must be considered if available, to address the
access issue in question. Should it be determined that the request results in the
183
fundamental alteration, a senior official should expeditiously sign off on the
determination.
Auxiliary Aids and Services
These are measures provided to ensure that appropriate access to programs and
services and activities is in place upon request. Auxiliary aids and services include, but
are not limited to providing documents in an alternative format such as Braille, providing
sign language interpreting services, note takers, real-time captioning services or
assistive listening devices.
Video Remote Interpreting (VRI)
VRI is permitted in the 2010 Title II ADA regulations. It provides a system in which sign
language interpreting can be conducted via video with the interpreter offsite. Caution
needs to be exercised to ensure that the technical quality of the system is sufficient to
appropriately transmit the information being communicated.
California Relay Service
The California Relay Service was created by ADA, Title IV. It is a free service to
facilitate effective telephone communication between persons who are Deaf and Hard of
Hearing and persons who are hearing. This is done via a relay operator who uses both
a teletype device and a telephone. The California Relay service may be reached at 711.
Note: Some entities have chosen to include “California Relay Service 711” on business
cards and letterheads to facilitate communication.
Reasonable Accommodation
Reasonable accommodation technically refers to the employment relationship. It is an
adjustment that provides the employee or applicant an opportunity to participate in: the
performance of essential functions of the job, the selection process or to receive
benefits and privileges offered to other employees in the work situation. Reasonable
accommodation solutions often vary widely. Accommodation requests must be handled
through an "interactive process".
Interactive Process:
The interactive process is required in the state law and federal case law, yet neither
defines it clearly. Problems have occurred when disputes have arisen and the employer
has not clearly documented the interactive process. For that reason, the following steps
are recommended:
1. The employer becomes aware that there is a disability that impacts elements of the
employment relationship.
2. The employer and employee/applicant meet to discuss the barrier in question and
potential resolutions. In this stage needed data is gathered from medic al providers,
consultants or the Jobs Accommodation Network.
3. After giving primary consideration to what the employee/applicant is requesting, the
employer makes a prompt decision regarding what effective accommodation will be
provided. Or, if the accommodation in question would result in an undue hardship the
employer is not obligated to provide said accommodation.
184
4. The employer promptly implements the reasonable accommodation.
5. The employer initiates follow-up discussions with the recipient of reasonable
accommodation to ensure that the accommodation was, in fact, effective.
Note: The reasonable accommodation process is ongoing and may need to be revisited
at any point in the employment relationship, as disabilities and technology may change.
Medical Inquiry
Medical inquiry is the acquisition of pertinent medical information to determine whether
a bona fide legal disability exists and what limitations it may present that necessitates a
reasonable accommodation. Medical inquiry should be limited in scope. Data related to
genetic characteristics should not be solicited, obtained or retained. Medical
information may not be lawfully stored in an employee's personnel file.
Undue Hardship
An undue hardship would be the provision of a reasonable accommodation that is
extensive, disruptive, fundamentally alters the nature of the program or is unduly
expensive. It is important to note that the expense issue is extremely difficult for a state
or local government entity to use as a defense . In doing so, one would need to consider
the total budget of the entity in question.
Service Animal
A service animal is a dog or miniature horse that has specifically been trained to
perform tasks for a person with a disability that they are not able to perform for
themselves due to their disability.
Note: This is a subject that generates the highest number of complaints received by the
US Department of Justice.
Maintenance of Accessible Features Policy
This relates to the requirement set by 28 CFR 35.133 in which an entity must maintain
accessible features. Policy and procedure in this area is designed to give staff
guidance unifying, repairing or reporting issues within access elements on sites where
programs, services and activities are conducted.
185
City of Vernon
Americans with Disabilities Act
Transition Plan
Report Prepared by:
Sally Swanson Architects, Inc.
2600 West Olive Avenue, 5th Floor
Burbank, CA 91505
Ian Blakey, Project Manager
Josh Klipp, Program Access Specialist
City of Vernon 2020 ADA Transition Plan
ACKNOWLEDGEMENT
Sally Swanson Architects, Inc. (SSA) would like to thank the City of Vernon staff that
were very generous with their time and knowledge, without which, this project would not
have been possible.
1
City of Vernon 2020 ADA Transition Plan
TABLE OF CONTENTS
Acknowledgement ................................................................................................ 1
TABLE OF CONTENTS .................................................................................................. 2
SECTION I: EXECUTIVE SUMMARY ..............................................................................5
INTRODUCTION: DEVELOPMENT OF ADA TRANSITION PLAN ...................... 5
OVERVIEW: SELF-EVALUATION OF POLICIES, PROCEDURES AND
PRACTICES ......................................................................................................... 7
OVERVIEW: ACCESS COMPLIANCE SURVEYS OF FACILITIES ..................... 8
Report Production ................................................................................................. 9
Prioritization Criteria for Barrier Mitigation – Facilities ........................................ 10
OVERVIEW: ACCESS COMPLIANCE SURVEYS OF THE PUBLIC RIGHTS-OF-
WAY ................................................................................................................... 12
Prioritization Criteria for Barrier Mitigation – Public Rights-of-Way ..................... 13
OFFICIAL(S) RESPONSIBLE ............................................................................ 16
PUBLIC INPUT ....................................................................................................18
TRANSITION PLAN IMPLEMENTATION ............................................................19
Maintenance of Accessible Features ...................................................................19
Implementation Policies .......................................................................................20
NOTICE OF COMPLIANCE UNDER ADA & CALIFORNIA STATE LAW ...........22
ADA GRIEVANCE PROCEDURE .......................................................................24
SECTION II: APPENDIX ................................................................................................26
Appendix A: Access Compliance Survey Report of Facilities ............................. 27
Table of Contents ............................................................................................... 28
Navigation & Legend .......................................................................................... 29
Facilities List ....................................................................................................... 32
Cost Summary .................................................................................................... 34
Survey Data ........................................................................................................ 36
Appendix B: Access Compliance Survey Report of Sidewalk ............................368
2
City of Vernon 2020 ADA Transition Plan
Table of Contents ..............................................................................................369
Navigation & Legend .........................................................................................370
Master Street List ..............................................................................................373
Cost Summary ...................................................................................................376
Survey Data .......................................................................................................390
Appendix C: Access Compliance Survey Report of Curb Ramps ....................1928
Table of Contents ............................................................................................1929
Navigation & Legend .......................................................................................1930
Cost Summary .................................................................................................1934
Survey Data .....................................................................................................1957
Appendix D: Access Compliance Survey Report of Pedestrian Signals ..........2268
Table of Contents ............................................................................................2269
Navigation & Legend .......................................................................................2270
Cost Summary .................................................................................................2273
Survey Data .....................................................................................................2282
Appendix E: Access Compliance Survey Report of Bus Stops ........................2433
Table of Contents ............................................................................................2434
Navigation & Legend .......................................................................................2435
Cost Summary .................................................................................................2438
Survey Data .....................................................................................................2443
Appendix F: Prioritization Criteria for Barrier Mitigation – PROW................... .2517
Table of Contents ............................................................................................2518
Definitions ........................................................................................................2519
Activity Score ...................................................................................................2521
Barrier Score ...................................................................................................2522
Priority Score ...................................................................................................2541
Appendix G: Prioritization Criteria for Barrier Mitigation – Facilities .................2542
Table of Contents .............................................................................................2543
Definitions .........................................................................................................2544
3
City of Vernon 2020 ADA Transition Plan
Priority Score ...................................................................................................2545
Severity Score .................................................................................................2546
Appendix H: Public Input .................................................................................2547
Flyer ................................................................................................................2549
4
City of Vernon 2020 ADA Transition Plan
SECTION I: EXECUTIVE SUMMARY
INTRODUCTION: DEVELOPMENT OF ADA TRANSITION PLAN
The Americans with Disabilities Act (ADA) of 1990 provides comprehensive civil
rights protections to qualified individuals with disabilities in the areas of employment,
public accommodations, State and local government services, and
telecommunications. A primary goal of the ADA is to ensure equal participation in
public life for all Americans with disabilities. Title II of the Act covers programs,
services and activities of public entities, such as the City of Vernon.
The ADA defines “disability” as:
a. a physical or mental impairment that substantially limits one or more major life
activities;
b. having a record of such an impairment; or
c. being regarded as having such an impairment.
If an individual meets any one of these tests, they are considered to be an individual
with a disability for purposes of the ADA.
Under Title II, a public entity may not deny the benefits of its programs, services,
and/or activities to individuals with disabilities by maintaining inaccessible facilities,
which house these programs, services and activities. The City's programs, services,
and activities, when viewed in their entirety, must be made accessible to and usable
by individuals with disabilities, except where to do so would result in a fundamental
alteration in the nature of the program; result in undue financial and administrative
burdens or threaten or destroy the historic significance of a historic property.
Section §35.150 requires that each program, service or activity conducted by a City,
when viewed in its entirety, be readily accessible to and usable by individuals with
disabilities. The regulation makes clear, however, that a City is not required to make
each of its existing facilities accessible (§35.150(a)(1)). Unlike Title III of the ADA,
which requires public accommodations to remove architectural barriers where such
removal is "readily achievable," or to provide goods and services through alternative
methods, where those methods are "readily achievable," Title II requires a City to
make its programs accessible in all cases, except where to do so would result in a
fundamental alteration in the nature of the program or in undue financial and
administrative burdens. The US Congress intended the "undue burden" standard in
Title II to be significantly higher than the "readily achievable" standard in Title III.
Thus, although Title II may not require removal of barriers in some cases where
removal would be required under Title III, the program access requirement of Title II
5
City of Vernon 2020 ADA Transition Plan
should enable individuals with disabilities to participate in and benefit from the
programs, services or activities of cities in all but the most unusual cases.
To comply with the Title II requirements for accessibility to City programs, services
and activities, this Transition Plan:
• Evaluates existing policies, procedures and practices as they pertain to the
City’s programs, services and activities;
• Provides findings and recommendations with regard to policies, procedures
and practices;
• Identifies physical obstacles in the public entity's facilities that limit the
accessibility of its programs or activities to individuals with disabilities;
• Assesses the extent of architectural barriers to program accessibility in the
public rights-of-way and within the buildings, parks and other facilities
operated by the City;
• Describes in detail the methods that will be used to make the facilities
accessible;
• Estimates costs for mitigation solutions;
• Specifies the steps necessary to achieve compliance;
• Provides a schedule for barrier removal/mitigation;
• Sets priorities for barrier elimination; and
• Indicates the official responsible for implementation of the plan.
These are the four components of a Transition Plan, along with where they are located
within this document:
• Identify all physical barriers to access……………….…………………...……8
• Provide solutions to the barrier identified…………….………………………..8
• Create a mitigation schedule………………………………………………….19
• Designate an official responsible………………………………….………….16
6
City of Vernon 2020 ADA Transition Plan
OVERVIEW: SELF-EVALUATION OF POLICIES, PROCEDURES AND
PRACTICES
In addition to identifying and modifying physical barriers, Title 28 CFR Part 35, Non-
Discrimination on the Basis of Disability in State and Local Government
Services, requires that a public entity evaluate its policies, procedures and
practices. The following outlines the City’s Self-Evaluation:
• Evaluate City policies, procedures, and practices as they pertain to its
programs, services and activities; and make the necessary modifications to
those policies and practices that do not meet the programmatic requirements
of Title II of the ADA
• Provide an opportunity to interested persons, including individuals with
disabilities or organizations representing individuals with disabilities, to
participate in the Self-Evaluation process by submitting comments
• Maintain, file and make available for public inspection a list of interested
persons consulted, a description of areas examined, and any problems
identified, and a description of any modifications made
It is recommended that the City periodically evaluate such policies, procedures and
practices pertaining to communication, auxiliary aids and services, emergency
response, publications, determination for undue burden, public activities, employment,
and new construction of facilities, in addition to physical accessibility to City facilities.
It is also recommended that for program barrier mitigation, a detailed outline of
administrative requirements and detailed requirements of needed policies be included.
The policy outline would serve as a guideline upon which the City's future policies may
be built.
An ADA Self-Evaluation Plan of City services, policies, and practices was
completed in 2020. Please contact the City ADA Coordinator for further
information regarding the “2020 City of Vernon ADA Self-Evaluation Plan”.
7
City of Vernon 2020 ADA Transition Plan
OVERVIEW: ACCESS COMPLIANCE SURVEYS OF FACILITIES
The ADA Transition Plan is used to document physical accessibility barriers to the City’s
programs, services, and activities and to outline a schedule / plan (or the basis to
produce one) for which the City shall follow to transition from a state of noncompliance
to compliance.
The access compliance surveys of City owned and leased facilities fulfill a portion of the
first two requirements of an ADA Transition Plan by identifying existing building
conditions that deviate from current State and Federal standards for new construction
and providing detailed description of proposed solutions for barrier mitigation. For each
barrier, the surveys outline the code deviations and requirements from the Americans
with Disabilities Act Accessibility Guidelines (ADAAG), ADA Standards for Accessible
Design (ADAS) and the Accessibility Standards in the California Building Standards
Code (CBC).
The access compliance surveys of City facilities cover approximately 7 owned and
leased facilities maintained by the City. The surveys identified approximately 614
different accessibility related barriers within the City facilities and that the financial cost
to mitigate all barriers identified in the surveys to be approximately $3.5 million.
Number of Facilities
Surveyed
Number of
Accessibility
Barriers
Total Cost
Estimated ($)
7 614
$3,533,451
The City facilities that were surveyed are shown in the table below:
Facility
Number
Facility Name Address City, State, Zip
00001 City Hall 4305 S Santa Fe Ave Vernon, CA 90058
00006 City Yard -
Maintenance Building 1
4305 S Santa Fe Ave Vernon, CA 90058
00007 City Yard -
Maintenance Building 2
4305 S Santa Fe Ave Vernon, CA 90058
00008 Power Plant Building Corner of 50th and
Seville
Vernon, CA 90058
00009 O.E. Clark Building 2716 Leonis Blvd Vernon, CA 90058
8
City of Vernon 2020 ADA Transition Plan
00010 Apartment Complex 3380 E 50th St Vernon, CA 90058
00011 City Parking Structure 4305 S Santa Fe Ave Vernon, CA 90058
Report Production
The following information contains the minimum data included in the Transition Plan –
Access Compliance Survey Reports:
• Item number of barrier and/or room numbers, corresponding to schematic site
and floor plans
• Area/location of the barrier; for example, room name or number
• Description of the barrier (as-built situation)
• As-is measurement/dimension
• Method of mitigation (e.g. physical alteration, purchase, program modification,
equivalent facilitation, etc.)
• Detailed description of proposed solution and, if applicable, an alternative or
interim solution
• Code citations, specifying the applicable sections in the State accessibility
regulations, and in the Federal standards
• Severity of individual barriers (four levels: 1=severe, 2=moderate, 3=mild
4=minor)
• Unit and estimated unit price
• Total estimated cost for barrier removal
• Special site conditions (if applicable)
The information obtained from the surveys of the City facilities is maintained on a
Microsoft Excel spreadsheet database.
Access Compliance Survey Reports are contained in Section II: Appendix.
SEE Appendix A: Access Compliance Survey Report of Facilities
9
City of Vernon 2020 ADA Transition Plan
Prioritization Criteria for Barrier Mitigation – Facilities
The third requirement of an ADA Transition Plan is to create a schedule that the City
shall follow which addresses the order in which barriers shall be mitigated. This
schedule shall be a public document and shall be made available for public inspection,
maintained, and updated for the duration of the Transition Planning period. The
maintaining and updating of this document shall mark the City’s good-faith efforts in
transitioning from a state of noncompliance to compliance regarding the ADA.
The difficulty and complexity of creating a schedule is recognized. Therefore, to provide
a methodology for creating a schedule, a prioritization criterion was formed to rank
barriers in order of most important to mitigate first to least important. The prioritization
criteria rates each barrier based on two factors, its Priority Score, and its Severity
Score. The Priority Score ranks the relative importance of addressing the barrier based
on its locational impact on the disabled population, and the Severity Score ranks the
barrier based on the degree of deviation exhibited compared to applicable access
standards.
Overall Prioritization Criteria according to programmatic functions:
▪ Importance of the program function
▪ Frequency of Use
▪ Program location and relation to other programmatic functions
▪ Future Projects
Since persons with disabilities utilize certain facilities with greater frequency than other
facilities, the impact of barriers identified at those facilities was deemed to be greater.
Upon compilation of the survey results, prioritization criteria were determined for barriers
identified in the survey and additional information was obtained to determine a final level
of prioritization.
Prioritization Criteria according to barrier location:
Priority can be further divided within any one facility depending on the function of the area
within the facility being surveyed. Typically, these areas are divided into 4 general
priorities.
The prioritization criteria can be used to sort the access barriers identified in the surveys
and create a schedule that order barrier mitigation work starting from barriers of highest
importance to barriers of least importance.
10
City of Vernon 2020 ADA Transition Plan
SEE Appendix G: Prioritization Criteria for Barrier Mitigation – Facilities
Additional Consideration: Age of the Facility
The age of the facility can also determine the City’s obligations to meet ADA compliance.
Facilities built before September 15, 2010 are obligated to be in compliance with the 1991
ADAAG, barring that the building has not gone through major reconstruction or alteration
henceforth that date. The facility will also be required to comply with the applicable
California Building Codes (CBC) at the time of construction.
If a facility was constructed or altered between the transition period of September 15,
2010 through March 15, 2012, an option of choosing either the 1991 ADA or 2010 ADA
Standards were allowed.
Facilities built after March 15, 2012 are required to meet the updated 2010 ADA
Standards as well as the California Building Code (CBC) at time of construction.
The caveat being that crucial program functions and services must be provided in
accessible locations.
Compliance Date for New
Construction or Alterations Applicable Standards
Before September 15, 2010 1991 Standards or UFAS
On or after September 15, 2010, and before March
15, 2012 1991 Standards, UFAS, or 2010 Standards
On or after March 15, 2012 2010 Standards
11
City of Vernon 2020 ADA Transition Plan
OVERVIEW: ACCESS COMPLIANCE SURVEYS OF THE PUBLIC
RIGHTS-OF-WAY
Barden v. City of Sacramento, 292 F. 3d 1073 established that sidewalks and
intersections constitute a service, program, or activity provided by a City, therefore they
are subject to accessibility regulations and should be addressed as part of the City’s
ADA Transition Plan.
Four different features provided in the PROW were surveyed, including sidewalks, curb
ramps, pedestrian signals and bus stops. Curb ramps, pedestrian signals and bus stops
were surveyed using a data collection checklist, based on Accessibility Standards in the
California Building Standards Code (CBC), Americans with Disability Act (ADA), Manual
on Uniform Traffic Control Devices (MUTCD) and US Department of Transportation
(USDOT) requirements as well as Public Rights-of-Way Accessibility Guidelines
(PROWAG) recommendations. Traditional measuring and smart-level equipment were
used to collect measurements for these surveys. Sidewalks were surveyed using
sidewalk profilers that were developed for the Federal Highway Administration (FHWA)
and adapted for sidewalk ADA surveys. The device captures information on slopes, and
surface variations and identifies deviations from the required ADA standards and other
applicable requirements.
The access compliance surveys of the Public Rights-of-Way (PROW), along with the
surveys of City owned and leased facilities, completely fulfill the first two requirements
for an ADA Transition Plan. As a part of this effort, approximately 77 miles of sidewalk,
551 curb ramps, 260 pedestrian signals and 81 bus stops were surveyed for access
compliance and that the financial cost to mitigate all barriers identified in the surveys to
be approximately $181.5 million.
Features Total Number
Surveyed
Number ADA
Compliant
Total Cost
Estimate ($)
Sidewalks 76.6 miles 39.7 miles $176,074,664
Curb Ramps 551 curb ramps 5 curb ramps $3,379,000
Pedestrian Signals 260 pedestrian
signals
0 pedestrian signals $1,931,250
Bus Stops 81 bus stops 15 bus stops $168,500
TOTAL $181,553,414
The information obtained from the surveys of the PROW is maintained on a geographic
information system (GIS) database and MS Excel database.
12
City of Vernon 2020 ADA Transition Plan
Access Compliance Survey Reports are contained in Section II: Appendix.
SEE Appendix B: Access Compliance Survey Report of Sidewalks
SEE Appendix C: Access Compliance Survey Report of Curb Ramps
SEE Appendix D: Access Compliance Survey Report of Pedestrian Signals
SEE Appendix E: Access Compliance Survey Report of Bus Stops
Prioritization Criteria for Barrier Mitigation – Public Rights-of-Way
The third requirement of an ADA Transition Plan is to create a schedule that the City
shall follow which addresses the order in which barriers within each feature shall be
mitigated. This schedule shall be a public document and shall be made available for
public inspection, maintained, and updated for the duration of the Transition Planning
period. The maintaining and updating of this document shall mark the City’s good-faith
efforts in transitioning from a state of noncompliance to compliance regarding
accessibility.
The difficulty and complexity of creating a schedule is recognized. Therefore, to provide
a methodology for creating a schedule, like City owned and leased facilities, a
prioritization criterion was formed, catered to the in-depth information that is provided
utilizing GIS.
The relative importance of each barrier, according to its impact upon the disabled
population was taken into account when developing the prioritization criteria for barrier
mitigation.
Overall Prioritization Criteria according to programmatic functions:
▪Importance of the program function
▪Frequency of Use
▪Program location and relation to other programmatic functions
Since persons with disabilities utilize certain facilities with greater frequency than other
facilities, the impact of barriers identified at those facilities was deemed to be greater.
Upon compilation of the survey results, prioritization criteria was determined for barriers
identified in the survey and additional information was obtained to determine a final level
of prioritization.
The general policy includes the continuous effort of providing connection to existing
pedestrian facilities where sidewalk segments are missing.
13
City of Vernon 2020 ADA Transition Plan
Prioritization Criteria for PROW according to barrier location:
▪Government Services
▪City Attractors (City Owned/Leased Facilities)
▪Schools
▪Parks
▪Transit Stops/Centers
▪Population Density
▪Streets (Arterials, Collectors)
The prioritization criteria developed for the PROW rates the relative importance of each
barrier based on a combination of rating the activity occurring at the barrier’s location, or
“Activity Score”, as well as rating the severity from which each feature deviates from
current State and Federal standards, or “Barrier Score”. Each score is rated on a scale
of 0 to 100, with 0 being the lowest, and 100 being the highest.
The combination of both the “Activity Score” and “Barrier Score” creates an overall
“Priority Score” that can be used to sort features identified in the surveys and create a
schedule that orders barrier mitigation work starting from features of highest priority to
features of lowest priority. The “Priority Score” is rated on a scale of 0 to 200, with 0
being the lowest priority, and 200 being the highest priority.
SEE Appendix F: Prioritization Criteria for Barrier Mitigation – Public Rights-of-
Way
Additional Consideration: Age of PROW
The age of the PROW element (i.e. sidewalk, curb ramp, pedestrian signal, or bus stop)
can also determine the City’s obligations to meet ADA compliance. PROW elements built
before September 15, 2010 are obligated to be in compliance with the 1991 ADAAG,
barring that the element has not gone through major reconstruction or alteration
henceforth that date. The element will also be required to comply with the applicable
California Building Codes (CBC) at the time of construction.
If a PROW element was constructed or altered between the transition period of
September 15, 2010 through March 15, 2012, an option of choosing either the 1991
ADA or 2010 ADA Standards were allowed.
PROW elements built after March 15, 2012 are required to meet the updated 2010 ADA
Standards as well as the California Building Code (CBC) at time of construction.
14
City of Vernon 2020 ADA Transition Plan
The caveat being that crucial program functions and services must be provided in
accessible locations.
Compliance Date for New
Construction or Alterations Applicable Standards
Before September 15, 2010 1991 Standards or UFAS
On or after September 15, 2010, and before March
15, 2012 1991 Standards, UFAS, or 2010 Standards
On or after March 15, 2012 2010 Standards
15
City of Vernon 2020 ADA Transition Plan
OFFICIAL(S) RESPONSIBLE
The ADA requires that an official be identified as responsible for the implementation of
the Entity’s plan.
It is the US DOJ's view that compliance with 28 CFR 35.150(a), like compliance with the
corresponding provisions of the section 504 regulations for public programs, would in
most cases not result in undue financial and administrative burdens on a typical City. In
determining undue financial and administrative burdens, all City resources available for
use in the funding and operation of City services, programs and activities would need to
be considered.
The burden of proving that compliance with paragraph (a) of 28 CFR 35.150 would
either fundamentally alter the nature of a service, program, or activity OR would result in
undue financial and administrative burdens rests with the City. The decision that
compliance would result in such alteration and/or burden must be made by the head of
the public entity or their designee and must be accompanied by a written statement of
the reasons for reaching that conclusion.
While the US DOJ has acknowledged the difficulty/complexity of not only making such a
determination, but also identifying the official responsible to make this
decision/determination, the department's intention is clear in that the determination must
be made by a high level official, no lower than a Department head, having budgetary
authority and responsibility for making spending decisions.
The Official Responsible for the implementation should be able to seek/acquire funding
for ADA barrier removal work over the City’s Transition Planning period. In most cities,
it is the Department Head who can effectively control the City’s budget line item – “ADA
Transition Planning budget”. As such, the City of Vernon will designate the Department
Head as the Official Responsible for the implementation of its ADA Transition Plan who
can be contacted as follows:
For Facilities and Public Rights-of-Way:
Director of Public Works
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
(323) 583-8811
California Relay, 711
16
Typically, the responsibility of making any particular City program, service or activity
accessible to all persons, regardless of ability, rests with the official who controls the
operating funds for that particular program, service or activity. To this end, the task of
seeking/getting approval for funds from the governing body to make the said program
accessible lies with the official responsible for the program.
Indication of the official(s) responsible for implementation of the plan fulfills the final
requirement of a Transition Plan.
17
City of Vernon 2020 ADA Transition Plan
PUBLIC INPUT
Per 28 Code of Federal Regulations, Part 35; Subpart D – Program Accessibility;
§35.150 – Existing Facilities; (d) Transition Plan (1): The City shall provide an
opportunity to interested persons, including individuals with disabilities or organizations
representing individuals with disabilities, to participate in the development of the ADA
Self-Evaluation and Transition Plan by submitting comments.
In order to satisfy this requirement and to gain the perspective of persons with
disabilities, the City sent out flyers between September 14, 2020 and September 21,
2020, where members of the public were invited to comment on and participate in the
City’s Draft ADA Self-Evaluation & Transition Plan. Public comments were due October
1, 2020.
SEE Appendix H: Public Input
18
City of Vernon 2020 ADA Transition Plan
TRANSITION PLAN IMPLEMENTATION
The document should be maintained and updated for the duration of the Transition
Planning period and a copy of the Transition Plan shall be made available upon request.
The final product is a working document to be modified as barriers are removed or
alterations are made, open to modification throughout the transition period. The
Official(s) responsible and project managers overseeing the barrier-removal projects will
document all such ADA improvements/upgrades. Also as part of this process, technical
infeasibility, if any, to meet necessary accessibility compliance will be documented and
filed for the City’s records by the Engineer-of-Record on the said project. It is also
recommended to provide accessibility site audits (inspections) of on-going projects as
part of the project close-out/certification. This documentation and verification of barrier-
mitigation will be integrated into the City’s ADA Transition Plan on a regular basis to
ensure that barriers are “checked-off” and the Plan is current with a record of barrier-
mitigation work. Annual reports of barrier-mitigation work may also be provided to the
City’s Board of Supervisors.
Maintenance of Accessible Features
The Maintenance of accessible features is mandated by State and Federal Regulations
and is an integral part of the City’s plan to transition into a more accessible destination.
Both, Chapter 28 Code of Federal Regulation, Part 35, Section 35.133 as well as the
California Building Code section 1101B.3 – Maintenance of accessible features, state:
1.A public accommodation shall maintain in operable working condition those
features of facilities and equipment that are required to be accessible to and
usable by persons with disabilities.
2.This section does not prohibit isolated or temporary interruptions in service or
access due to maintenance or repairs.
Both these sections provide that a public entity shall maintain in operable working
condition those features of facilities and equipment that are required to be accessible to
and usable by persons with disabilities. They require that, to the maximum extent
feasible, facilities must be accessible to, and usable by, individuals with disabilities.
These sections recognize that it is not sufficient to provide features such as accessible
routes, ramps, or elevators, if those features are not maintained in a manner that
enables individuals with disabilities to use them. Inoperable elevators, are neither
"accessible to" nor "usable by" individuals with disabilities.
It is, of course, impossible to guarantee that mechanical devices will never fail to
operate. As such, the 2nd paragraph provides that this section does not prohibit isolated
19
City of Vernon 2020 ADA Transition Plan
or temporary interruptions in service or access due to maintenance or repairs. This
paragraph is intended to clarify that temporary obstructions or isolated instances of
mechanical failure would not be considered violations of the ADA or this part. However,
allowing obstructions or "out of service" equipment to persist beyond a reasonable
period of time would violate this part, as would repeated mechanical failures due to
improper or inadequate maintenance. Failure of the public entity to arrange prompt
repair of inoperable elevators or other equipment intended to provide access would also
violate this part.
A City-wide formal policy specifically addressing the legal requirements (28CFR Part
35.133 & CBC1101B.3) of maintaining accessible features would be of long-term benefit
to the City. When, over time, an accessible feature fails, institutionalizing organizational
commitments towards protocols and maintenance ensures an appropriate action is
taken.
Implementation Policies
The City of Vernon proposes the following implementation policies for transition of its
facilities and public rights-of-way into compliance with the ADA.
1)The City will continue to seek out sources of funding, including funds associated
with the City’s Capital Improvement Project funds, and other Tenant
Improvement projects.
2)The City will continue to seek out a variety of grants to assist in ADA mitigation
each year.
3)Where projects in the City’s pipeline are identified whose scope of work overlaps
with the location of access barriers identified in the Access Compliance Survey,
the City shall ensure that the project incorporate the mitigation of the
corresponding barriers. The project and completion of mitigation work shall be
appropriately documented in the corresponding inventory.
4)In addition to the improvements to facilities, curb ramps and traffic signals, the
City will continue to perform work on an ongoing, routine basis related to
maintaining the ramps, sidewalks, bridges, etc. so they are in good condition.
Many of these maintenance tasks are beneficial to the disabled population, for
example, by reducing trip hazards and keeping sufficient accessible space along
sidewalks. Examples of work undertaken include trimming shrubbery; repairing or
grinding sidewalks; ramping raised sidewalks; filling holes; weeding and cleanup
20
City of Vernon 2020 ADA Transition Plan
of debris; sweeping; repairing tree grates; inspections for needed sidewalk
repairs.
Existing Policies and/or Standards:
1)The City prioritizes complaints from the public about barriers and moves to
mitigate them in a timely manner.
2)The City ensures all construction, in the public rights-of-way, is built according to
the standards the City has identified. The following are the City’s current
standards:
a.2018 Standard Plan A88A - Curb Ramp Details
b.Standard Plan PV 693 - Standard Driveway
c.Standard Plan PV 582 - Standard Sidewalk, Curb, and Gutter
d.Standard Plan PV 2133 - Standard Offset Requirements
21
City of Vernon 2020 ADA Transition Plan
NOTICE OF COMPLIANCE UNDER ADA & CALIFORNIA STATE LAW
In accordance with the requirements of Title II of the Americans with Disabilities Act
(ADA) of 1990, the Americans with Disabilities Amendments Act of 2008, the Fair
Employment & Housing Act (FEHA), California Government Code Section 11135 and
other applicable codes, the City does not discriminate against individuals on the basis of
disability in its services, programs or activities.
Employment: The City does not discriminate on the basis of disability in its hiring or
employment practices and will comply with the Fair Employment and Housing Act, as
well as Title I of the ADA, including the regulations promulgated by the U.S. Equal
Employment Opportunity Commission (EEOC), including the requirement to provide
reasonable accommodations.
Effective Communication: The City will generally, upon request, provide appropriate
aids and services leading to effective communication for qualified person(s) with
disabilities, including sign language interpreters, documents in Braille and other
alternate formats to ensure information and communication is accessible to people who
have speech, hearing, vision, or cognitive impairments so they can participate equally in
the programs, services and activities.
Modification to Policies and Procedures: The City will make reasonable
modifications to policies and programs to ensure that people with disabilities have an
equal opportunity to participate in all of its programs, services and activities. For
example, individuals with service animals behaving within applicable standards are
welcome in offices and City facilities, even when pets are generally prohibited.
Anyone who requires auxiliary aids and services for effective communication, or a
modification of policies or procedures to participate in a program, service or activity in
the City should communicate with the responsible Department contact as soon as
possible, but no later than 48 hours before the scheduled event.
Neither the ADA, nor State law requires the City to take action that would fundamentally
alter the nature of its programs, activities or services or impose an undue financial or
administrative burden. Complaints that a program, activity or service of the City is not
accessible should be directed to the ADA Coordinator:
Director of Human Resources
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
(323) 583-8811
22
City of Vernon 2020 ADA Transition Plan
California Relay, 711
The City does not place a surcharge on a particular individual with a disability or a group
of individuals with disabilities to cover the cost of providing auxiliary aids and services or
making a reasonable modification to a policy to create access.
23
City of Vernon 2020 ADA Transition Plan
ADA GRIEVANCE PROCEDURE
City of Vernon ADA Grievance Procedure
Grievance Procedure under ADA and California State Disability Rights Laws
This grievance procedure is established to meet the requirements of the Americans with
Disabilities Act of 1990 (“ADA”), the Americans with Disabilities Amendments Act
(ADAAA) and California State law. It may be used by anyone wishing to file a complaint
alleging discrimination on the basis of disability in the provision of services, activities,
programs or benefits by the City of Vernon. The City’s Disability Discrimination Policy
and grievance procedures govern employment-related complaints of disability
discrimination.
The complaint should be in writing and contain information about the alleged
discrimination such as name, address, phone number of the complainant and location,
date and a description of the problem(s). Alternative means of filing a complaint, such
as personal interviews or tape recording the complaint, are available to people with
disabilities upon request.
The complaint should be submitted by the grievant and/or their designee as soon as
possible, but no later than 60 calendar days after the alleged violation to:
Director of Human Resources
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
(323) 583-8811
California Relay, 711
Within 15 calendar days after receipt of the complaint, the ADA Coordinator or his/her
designee will schedule a meeting with the complainant to discuss the complaint and
possible resolutions. After an investigation and review the ADA Coordinator will respond
in writing, and, where appropriate, in a format accessible to the complainant. The
response will explain the City position on the issue and offer options for substantive
resolution of the complaint.
If the response by the ADA Coordinator does not satisfactorily resolve the issue, the
complainant and/or their designee may appeal the decision within 15 calendar days
after receipt of the response to the City Administrator or their designee.
24
City of Vernon 2020 ADA Transition Plan
After receiving the appeal, the City Administrator or their designee will review the appeal
and the ADA Coordinator finding. Within a reasonable period, after a review, the City
Administrator or their designee will respond in writing, and, where appropriate in a
format that is accessible to the complainant, with a final resolution to the complaint.
All written complaints received by the ADA Coordinator or their designee, appeals to the
City Administrator or their designee, and responses from these two offices will be
retained by the City for at least three years.
25
City of Vernon 2020 ADA Transition Plan
SECTION II: APPENDIX
A. Access Compliance Survey Report of Facilities………………….27
B. Access Compliance Survey Report of Sidewalks……………….368
C. Access Compliance Survey Report of Curb Ramps……………1928
D. Access Compliance Survey Report of Pedestrian Signals……2268
E. Access Compliance Survey Report of Bus Stops………………2433
F. Prioritization Criteria for Barrier Mitigation – Public Rights-of-
Way……………………………………………………………………………2517
G. Prioritization Criteria for Barrier Mitigation – Facilities………2542
H. Public Input……………………………………………………………2547
26
Access Compliance Survey Report
Appendix A: Facilities
City of Vernon
City of Vernon - Facilities
October 2020
SSA Project # 19033
27
October 2020
SSA Project # 19033
City of Vernon - Facilities - ACS Report
TABLE OF CONTENTS
I. Cover & Table of Contents
i. Report Navigation and Legend Abbreviations
ii. Cost Summary
II. Facilities List
III. Survey Data for Facilities
28
October 2020
SSA Project # 19033
City of Vernon - Facilities - ACS Report
NAVIGATION & LEGEND
29
October 2020
SSA Project # 19033
City of Vernon - Facilities - ACS Report
NAVIGATION
1. Item Number: Number corresponding to the number on the Barrier Location Map which identifies the general location of
the identified barriers.
2. Item Name: Describes the barrier location / item title (e.g.: parking lot, room name).
3. As-Built
Description: Description of identified barrier based on applicable accessibility codes.
4. As-Built: Existing conditions / dimensions.
5. Proposed Solution: Description of steps necessary to remove barrier and, if applicable, an interim or alternative solution.
6. Notes: Additional notes pertaining to barrier.
7. Codes / Info: - PCODE: specifies the relevant SSA database code. Database code plus suffix:
- REF: data shown for reference only [scope of work related to or covered by other item].
- NT: non-typical problem or solution.
- ADAAG, ADA 2010, PRoW and CBC 2019: The Federal Standard for accessibility adopted by the
Department of Justice.
8. Qty: Number of units required.
9. Type: Unit of measurement used to compute conceptual cost estimate. LF=linear feet; SF=square feet; JOB=lump
sum.
10. Cost: Estimated conceptual cost of specific solution per one unit.
11. Total: Total estimated conceptual cost for removing identified barrier (multiplied Qty by Cost).
12. ID No: Specifies Facility Number, Area Number: 1=Interior / 0=Exterior, and Part / Floor Number.
7653 921 11 124810
30
October 2020
SSA Project # 19033
City of Vernon - Facilities - ACS Report
ABA Architectural Barriers Act
ADA Americans with Disability Act
ADAAG ADA Accessibility Guidelines
ADACO ADA-Coordinator
AED Automated External Defibrillators
AFF Above finished floor
BCS Baby Changing Station
CA State of California
CSAS CA State Accessibility Standards
ANSI American National Standards Institute
C.T.P. Contact third party
cl Center Line
D.A. Designated accessible
DCS Diaper changing station
DF Drinking fountain
Dir. Director
E.F. Equivalent facilitation
EHD Electric Hand Drier
FC Fire Chief
FD Finance Director
FDC Facilities Design & Construction
FHAAG Fair Housing Act Accessibility Guidelines
Fig. Figure
FM&O Facilities, Maintenance & Operations
FND Feminine napkin disposal
FTD Feminine Tissue Dispenser
Gov. Government
HQ Headquarters
HWB Hazardous waste bin
IBC International Building Code
ICC International Code Council
ISA International Symbol of Accessibility
JOB per one job (lump sum)
Lav Lavatory
lbs Pounds
LF Linear foot
Lib Library
MOD Modernization project
MoM Method of mitigation
MP Master priority
MRR Men’s restroom
N.A.R. No action required
NT Non-typical
o.c. On center
O/R Official responsible
P.A. Physical alteration
P.M. Program modification
POM Plant Operations & Maintenance
POT Path of travel
PROW Public Right-of-Way
PTD Paper towel dispenser
PW Public Works
Qty Quantity
REF Reference
RGB Rear grab bar
SCD Seat cover dispenser
SD Soap dispenser
sec. Second
SF Square foot
SGB Side grab bar
tbd To be determined
TPD Toilet paper dispenser
UFAS Uniform Federal Accessibility Standards
WC Water closet
WRR Women’s restroom
WT Water treatment facility
WWT Waste water treatment facility
ABBREVIATIONS
31
October 2020
SSA Project # 19033
City of Vernon - Facilities - ACS Report
FACILITIES LIST
32
Facility#:Facility:Address:
Access Compliance Survey Report Facility ListCity of Vernon
1 City Hall 4305 S Santa Fe Ave
6 City Yard - Maintenance Building 1 4305 S Santa Fe
7 City Yard - Maintenance Building 2 4305 S Santa Fe
8 Power Plant Building Corner of 50th and Seville
9 O.E. Clark Building 2716 Leonis Blvd
10 Apartment Complex 3380 E 50th St
11 City Parking Structure 4305 S Santa Fe Ave
October 2020 S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #19033.00
33
October 2020
SSA Project # 19033
City of Vernon - Facilities - ACS Report
COST SUMMARY
34
Facility # & Name
Access Compliance Survey Report Cost Summary (By Fac/Floor)City of Vernon
Interior/Exterior Floor CostID
$1,808,676.00City Hall1
On-site $68,100.00Exterior1-0-1
Basement $356,805.00Interior1-1-0
First Floor $887,835.00Interior1-1-1
Second Floor $423,441.00Interior1-1-2
Third Floor $72,495.00Interior1-1-3
$96,600.00City Yard - Maintenance Building 16
On-site $4,200.00Exterior6-0-1
First Floor $92,400.00Interior6-1-1
$190,185.00City Yard - Maintenance Building 27
First Floor $190,185.00Interior7-1-1
$496,176.00Power Plant Building8
On-site $30,951.00Exterior8-0-1
Basement $23,520.00Interior8-1-0
First Floor $441,705.00Interior8-1-1
$526,341.00O.E. Clark Building9
On-site $23,850.00Exterior9-0-1
First Floor $502,491.00Interior9-1-1
$110,523.00Apartment Complex10
On-site $110,523.00Exterior10-0-1
$155,115.00City Parking Structure11
On-site $117,915.00Exterior11-0-1
On-site $37,200.00Interior11-1-1
Grand Total for $3,383,616.00City of Vernon
October 2020 S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #19033.00
35
October 2020
SSA Project # 19033
City of Vernon - Facilities - ACS Report
SURVEY DATA
36
City Hall
4305 S Santa Fe Ave
Access Compliance Survey Report
City of Vernon
October 2020
SSA Project #:19033.00
1Facility #:
37
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
Sally Swanson
Architects
San Francisco, CA
Item Number
19040
8-27-2020
1-0-1
4305 S. SANTA FE
AVE
VERNON, CA
90058
CITY HALL
1-0-1 City Hall
Exterior- On-Site
4
1 3
5
2
38
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 1-1-0
Interior- Basement
4305 S. SANTA FE
AVE
VERNON, CA
90058
CITY HALL
City Hall1-1-0
6
1
2
3
7
4
5
39
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 1-1-1
Interior- First Floor
4305 S. SANTA FE
AVE
VERNON, CA
90058
CITY HALL
City Hall1-1-1
8
3
11
14
10
9
15
2
6
1
16
17
13
17 7
4
5
40
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 1-1-2
Interior- Second Floor
4305 S. SANTA FE
AVE
VERNON, CA
90058
CITY HALL
City Hall1-1-2
9
1
13
14
12
16
15
16
11
10
8
20
19
3
2
18
17
7
6
5
4
41
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 1-1-2E
Interior- Second Floor Floor
4305 S. SANTA FE
AVE
VERNON, CA
90058
CITY HALL
City Hall- East Wing1-1-2E
7
2
1
6
15
8
14
12
11
5
4
13
9
10
3
42
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 1-1-3
Interior- Third Floor
4305 S. SANTA FE
AVE
VERNON, CA
90058
CITY HALL
City Hall1-1-3
8
6
7
10
5
11
3
9
1
2
4
43
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Police Entrance1 Staff Only
Door Swing
$15,0001 $15,000JOB
57" from face of door to sloped area
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
515
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Door Swing
REF
Door width plus 21" to wall
ID23CREFPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
516
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
44
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Reach Range
$3001 $300JOB
57" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
517
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Walk
$75100 $7,500SF
7.2% direction of travel
EF01PCODE
4.3.7ADAAG 91
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.
Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
514
403.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
45
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
General Path of Travel2 Staff Only
Accessible Route
$7530 $2,250SF
3.0%
EF07PCODE
4.3.7ADAAG 91
Cross slope more than 1":48" (2.083%).
Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
520
403.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Fixed Bench
$1,5001 $1,500JOB
16" high seat.
NO06APCODE
4.37.5ADAAG 91
Seat front edge height is not between 17" min. to
19" max. above ground of floor space.
Provide new compliant bench with accessible
dimensions.
• As-Built Description:
• Proposed Solution:
• As-Built:
518
903.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
46
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Fixed Bench
$1,5001 $1,500JOB
No clear space adjacent to bench.
NO07PCODE
4.32.2ADAAG 91
Clear and level floor or ground space (30" x 48")
not overlapping with other clear space
requirements, is not provided at at least one end of
the bench.
Provide and position a clear and level floor or
ground space to allow wheelchair users to be seated
shoulder-to-shoulder with an individual seated on
the bench.
• As-Built Description:
• Proposed Solution:
• As-Built:
519
903.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Vertical Clearance
$1,5001 $1,500JOB
72" high
EG01PCODE
4.4.2ADAAG 91
Overhead clearance less than 80" above finished
floor.
Modify overhead clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
521
307.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
47
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Ramp to Entrance3 Staff Only
Curb or Barrier
$5150 $2,550LF
No wheel guide
EB14PCODE
4.8.7ADAAG 91
No curb (2" minimum height) or wheel guide
(barrier shall be provided
that prevents the passage of a 4" diameter sphere) at
sides of ramp.
Provide 2" minimum curb or wheel guide.
• As-Built Description:
• Proposed Solution:
• As-Built:
524
405.9.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Height
$22550 $11,250LF
32" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
523
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
48
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Top and Bottom Extension at
Ramps 4 REF
8" parallel to ground.
ED05REFPCODE
4.8.5(2)ADAAG 91
Ramp handrail does not extend horizontally 12"
past top and / or bottom of ramp.
Provide ramp handrail extension (cost for each
extension piece).
• As-Built Description:
• Proposed Solution:
• As-Built:
522
505.10.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
49
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Stairs to Entrance4 Staff Only
Height
$22530 $6,750LF
33" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
526
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Top & Bottom Extension at Stairs
6 REFED06REFPCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
525
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
50
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Tread Surface
$27100 $2,700LFEC02PCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
527
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
51
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Employee Entrance5 Staff Only
Door
$3001 $300JOBID06PCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Provide 10" min. "kick plate" covering width of
door when altering area.
• As-Built Description:
• Proposed Solution:
530
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Swing
$15,0001 $15,000JOB
Door width plus 14" to rocks
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
529
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
On-site $68,100.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
52
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-0-1
City Hall Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Exterior $68,100.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
53
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Men's Restroom1 Staff Only
Corridor
$1501 $150JOB
31" wide to locker
IH03APCODE
4.3.3ADAAG 91
Corridor, for occupant load less than 10, less than
36" wide.
Remove or relocate furniture and storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
207
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Door Clearance
$7,8001 $7,800JOB
29" wide
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
206
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
54
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Door Swing
$15,0001 $15,000JOB
7" strike
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
205
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Fixed Bench
$1,5001 $1,500JOBNO07PCODE
4.32.2ADAAG 91
Clear and level floor or ground space (30" x 48")
not overlapping with other clear space
requirements, is not provided at at least one end of
the bench.
Provide and position a clear and level floor or
ground space to allow wheelchair users to be seated
shoulder-to-shoulder with an individual seated on
the bench.
• As-Built Description:
• Proposed Solution:
21
903.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Reach Range
$3001 $300JOB
52" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
208
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
55
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Reach Range
$3001 $300JOB
67" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
450
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Restroom
?1 $105,000JOBWA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
209
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
204
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
56
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Women's Locker Room2 Staff Only
Accessories
$2251 $225JOB
Behind water closet
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
16
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Fixed Bench
$1,5001 $1,500JOBNO02PCODE
16.12.1ADAAG 91
Single fixed bench provided is not accessible.
Provide additional accessible bench or replace.
• As-Built Description:
• Proposed Solution:
210
903.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
57
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Grab Bars
$1,0201 $1,020JOB
Extends 21" from center line of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
214
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Lavatory
$4,5001 $4,500JOB
Knee space: 28" high
WD04APCODE
Fig. 31ADAAG 91
Knee clearance 27" min. high starting 8" back from
the front edge of the lavatory towards the wall is
not provided.
Remount compliant fixture to accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
211
306.3.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Shower
$12,0001 $12,000JOBWF01PCODE
4.21ADAAG 91
Shower not accessible; multiple compliance
violations.
Provide accessible shower.
• As-Built Description:
• Proposed Solution:
212
608.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
58
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Toilet Stall
$4,5001 $4,500JOB
51" long to door 69" in front of stall
WB03PCODE
4.17.3ADAAG 91
Less than 59" from back wall to front wall or door
swing of toilet stall, or less than 56" if water closet
is wall-hung.
Provide new enclosure at existing water closet
fixture.
• As-Built Description:
• Proposed Solution:
• As-Built:
213
604.8.1.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
59
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Supervisor's Men's Restroom3 Staff Only
Door Hardware
$7501 $750JOBID07PCODE
4.13.9ADAAG 91
Door does not have accessible operating hardware.
Provide lever handle or other accessible hardware.
• As-Built Description:
• Proposed Solution:
215
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Drinking Fountain
$6,0001 $6,000JOBIA01APCODE
4.1.3(10)(a)ADAAG 91
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.
Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
221
211.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
60
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Drinking Fountain
$1,5001 $1,500JOBIA05CPCODE
4.4.1ADAAG 91
Drinking fountain lacks protection for visually
impaired persons.
Provide cane-detectable rails.
• As-Built Description:
• Proposed Solution:
10
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Grab Bars
$1,0201 $1,020JOB
Extends 21"
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
219
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Shower
$12,0001 $12,000JOBWF01PCODE
4.21ADAAG 91
Shower not accessible; multiple compliance
violations.
Provide accessible shower.
• As-Built Description:
• Proposed Solution:
217
608.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
61
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Toilet Stall
$4,5001 $4,500JOB
48" long partition, 63" in front of
toilet
WB03PCODE
4.17.3ADAAG 91
Less than 59" from back wall to front wall or door
swing of toilet stall, or less than 56" if water closet
is wall-hung.
Provide new enclosure at existing water closet
fixture.
• As-Built Description:
• Proposed Solution:
• As-Built:
218
604.8.1.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
62
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Briefing Room4 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
223
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Non-Fixed Desk
$4,8001 $4,800JOB
Knee space: 14" deep
IN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
• As-Built:
222
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
63
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Vertical Clearance
$1,5001 $1,500JOB
46" high
EG01PCODE
4.4.2ADAAG 91
Overhead clearance less than 80" above finished
floor.
Modify overhead clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
224
307.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
64
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Break Room5 Staff Only
Cooktops
$1,9501 $1,950JOBKF15PCODE
13.3.4(6)ADAAG 91
Cooktop controls require reaching across the
burners.
Provide cooktop with accessible controls.
• As-Built Description:
• Proposed Solution:
226
804.6.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Non-Fixed Desk
$4,8001 $4,800JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
228
306.1ADA 2010
Due to base.
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
65
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Reach Range
$3001 $300JOB
65" high
IE02PCODE
4.2.6ADAAG 91
Reach height to control or access point, where side
approach is available, exceeds 48" or is less than
15" in height, or exceeds 10" in depth.
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
227
308.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Reach Range
$3001 $300JOB
PTD: 57" high
IE02PCODE
4.2.6ADAAG 91
Reach height to control or access point, where side
approach is available, exceeds 48" or is less than
15" in height, or exceeds 10" in depth.
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
229
308.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Sink
$5,2501 $5,250JOB
Top: 36" high
IN06PCODE
4.24.2ADAAG 91
Sink rim higher than 34" above floor.
Remodel sink cabinet to lower sink.
• As-Built Description:
• Proposed Solution:
• As-Built:
11
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
66
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Sink
$5,2501 $5,250JOB
Knee space: none
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
225
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
67
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Tactical Locker6 Staff Only
Door
$9001 $900JOB
46" high
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
235
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Door Clearance
$7,8002 $15,600JOB
27" wide
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
232
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
68
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Door Swing
$15,0001 $15,000JOB
44" deep
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
231
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Drinking Fountain
$6,0001 $6,000JOBIA01APCODE
4.1.3(10)(a)ADAAG 91
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.
Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
237
211.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Drinking Fountain
$1,5001 $1,500JOBIA05CPCODE
4.4.1ADAAG 91
Drinking fountain lacks protection for visually
impaired persons.
Provide cane-detectable rails.
• As-Built Description:
• Proposed Solution:
12
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
69
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Fixed Bench
$1,5001 $1,500JOBNO07PCODE
4.32.2ADAAG 91
Clear and level floor or ground space (30" x 48")
not overlapping with other clear space
requirements, is not provided at at least one end of
the bench.
Provide and position a clear and level floor or
ground space to allow wheelchair users to be seated
shoulder-to-shoulder with an individual seated on
the bench.
• As-Built Description:
• Proposed Solution:
236
903.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Height
$22530 $6,750LF
31" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
239
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Reach Range
$3001 $300JOB
53" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
234
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
70
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Restroom
?1 $105,000JOBWA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
233
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
230
Mitigated:
YES
NO
SeverityPriority
3 3
Top & Bottom Extension at Stairs
2 REFED06REFPCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
238
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
71
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-0
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Basement
Basement $356,805.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
72
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
General0 Staff Only
Electrical
$9001 $900JOB
All switches 53" high
IC01PCODE
4.2.5 & 6ADAAG 91
Electric switch or control mounted less than 15"
measured to the bottom of the outlet box or greater
than 48 inches measured to the top of the outlet
box.
Relocate light switches or control to between 15"
and 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
4
308.2.1 & 308.2.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Electrical
$9001 $900JOB
9" high to bottom
IC01PCODE
4.2.5 & 6ADAAG 91
Electric switch or control mounted less than 15"
measured to the bottom of the outlet box or greater
than 48 inches measured to the top of the outlet
box.
Relocate light switches or control to between 15"
and 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
5
308.2.1 & 308.2.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
73
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Lobby1 Staff Only
Door
$1205 $600SF
2.8%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
10
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Door Closer
$1,1251 $1,125JOB
3 seconds
ID03APCODE
4.13.10 &11ADAAG 91
Excessive force required to open door and/or door
closing time of less than 5 seconds.
Provide new door closer adjusted to accessible
standards.
• As-Built Description:
• Proposed Solution:
• As-Built:
7
404.2.8 & 404.2.9ADA 2010
Main entrance
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
74
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Door Threshold
$7501 $750JOB
0.5" high vertical
ID02PCODE
4.1.6(3)(d)(ii)ADAAG 91
Existing threshold at door is 1/2" high or less but
without a beveled edge on both sides.
Modify threshold to have beveled edge on each
side.
• As-Built Description:
• Proposed Solution:
• As-Built:
8
404.2.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Doormat
$1,5002 $3,000JOBID05PCODE
4.5.3ADAAG 91
Doormat hinders access to disabled persons.
Provide new doormat; recess or attach at edges.
• As-Built Description:
• Proposed Solution:
6
302.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Drinking Fountain
$9,6001 $9,600JOB
Knee space: 26.5" high
IA02PCODE
4.15.5(1)ADAAG 91
Wall- and post-mounted cantilevered units: Knee
space not provided at drinking fountain (27" high,
8" deep, 30" wide from front of drinking fountain).
Provide new, accessible fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
15
602.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
75
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Drinking Fountain
$1,5001 $1,500JOBIA05CPCODE
4.4.1ADAAG 91
Drinking fountain lacks protection for visually
impaired persons.
Provide cane-detectable rails.
• As-Built Description:
• Proposed Solution:
16
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Fire Alarm
$8252 $1,650JOB
49"-51" high
IC03PCODE
4.2.5ADAAG 91
Fire alarm pull stations not 42"-48" from floor to
center. Note: Required only at new construction,
or where mounting location was or is to be
remodeled.
Remount fire alarm station to be 42" min., and 48"
max. from floor to center.
• As-Built Description:
• Proposed Solution:
• As-Built:
3
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Public Counter
$6,0001 $6,000JOB
Lowered counter 34" high by 32" long
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
13
904.4ADA 2010
No pass through within reach range
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
76
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Reach Range
$3001 $300JOB
56" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
9
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Reach Range
$3001 $300JOB
50" high, 16" deep reach
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
14
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Reach Range
$3001 $300JOBIE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
30
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
77
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Reach Range
$3001 $300JOB
57" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
31
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Signage
$2701 $270JOBSA10APCODE
4.1.3(16)ADAAG 91
At final exit door to exterior: Where required exit
signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT" sign at door.
• As-Built Description:
• Proposed Solution:
2
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Vertical Clearance
$3007 $2,100LF
28.5" high
EG01APCODE
4.4.2ADAAG 91
Overhead clearance less than 80" above finished
floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
11
307.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
78
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Vertical Clearance
$3005 $1,500LF
56" high
EG01APCODE
4.4.2ADAAG 91
Overhead clearance less than 80" above finished
floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
12
307.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
79
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Men's Restroom2 Staff Only
Accessible Route
$7525 $1,875SF
3.1%
EF07PCODE
4.3.7ADAAG 91
Cross slope more than 1":48" (2.083%).
Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
42
403.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Accessories
$2251 $225JOB
12" o.c. and 18.5" high
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
43
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
80
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Accessories
$4501 $450JOB
41.5" high
WG03PCODE
4.19.6ADAAG 91
Bottom of mirror located above lavatories or
countertops more than 40" above floor.
Relocate or provide new accessible mirror.
• As-Built Description:
• Proposed Solution:
• As-Built:
19
603.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Door
$9001 $900JOB
45.5" o.c.
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
44
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Door Clearance
$7,8001 $7,800JOB
29" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
17
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
81
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Door Swing
$15,0001 $15,000JOB
52" from face of door
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
18
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Grab Bars
$1,0201 $1,020JOB
Extends 20" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
41
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Water Closet
$1,5001 $1,500JOB
19" o.c.
WB02CPCODE
Fig. 28ADAAG 91
Water closet not 16"-18" (CA: 17"-18") from near
side wall to center line of water closet (2010
ADAAG: 16"-18").
Relocate existing water closet and plumbing,
remount with offset closet flange to provide 18"
max. from side wall.
• As-Built Description:
• Proposed Solution:
• As-Built:
40
604.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
82
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Women's Restroom3 Staff Only
Accessible Route
$7525 $1,875SF
2.7%
EF07PCODE
4.3.7ADAAG 91
Cross slope more than 1":48" (2.083%).
Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
22
403.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Accessories
$2251 $225JOB
12" o.c. and 18.5" high
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
23
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
83
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Door
$9001 $900JOB
45" o.c.
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
45
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Door Clearance
$7,8001 $7,800JOB
27" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
20
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Grab Bars
$1,0201 $1,020JOB
Extends 21" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
21
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
84
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Lobby Stairs4 Staff Only
Handrail
$36030 $10,800LF
Guards: 32" high
ED08APCODEGuards (42" high) not provided at side of ramp or
landing where drop-off to adjacent grade or floor
exceeds 30" height (California building code
requirement only).
Provide new guards, including handrail at ramp.
• As-Built Description:
• Proposed Solution:
• As-Built:
26
Mitigated:
YES
NO
SeverityPriority
1 3
Height
$22540 $9,000LF
30" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
25
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
85
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Top & Bottom Extension at Stairs
REFED06REFPCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
24
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
86
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
City Council Chamber5 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
38
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
37
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
87
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Disabled Seating
$1,3501 $1,350JOBGB01APCODE
4.1.3(19)(a)ADAAG 91
Wheelchair space (33"x48") not provided at fixed
seating with forward or rear approach. (NOTE:
Space must be adjacent to regular seating; can
provide easily removable fixed seat).
Remove fixed seating and provide wheelchair space
plus necessary maneuvering clearance.
• As-Built Description:
• Proposed Solution:
33
221.2ADA 2010
51 seats, 6 accessible, including 4 companion
• Notes:
Mitigated:
YES
NO
SeverityPriority
2 3
Door Clearance
$7,8001 $7,800JOB
19" clear opening width, leaf
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
35
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 1
Elevator
?1 $360,000JOB
44" deep 48" to door, 78" wide
IK04APCODE
Fig. 22ADAAG 91
In an elevator cab with 36” wide side slide opening
doors, cab-size is not 68” min wide and/or 54” min
deep between the back wall and the elevator door,
and 51” min deep between the back wall and the
return panel.
Provide new elevator.
• As-Built Description:
• Proposed Solution:
• As-Built:
29
407.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
88
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Elevator
$3602 $720JOBIK11CPCODE
4.10.5ADAAG 91
Braille and raised floor numbers on entrance jambs
located more or less than 5' above floor.
Relocate Braille and raised floor numbers on
entrance jambs to 5' above floor.
• As-Built Description:
• Proposed Solution:
27
703.4.1ADA 2010
No star
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 3
Elevator
$1506 $900SETIK11NTPCODEBraille symbols on floor indicators of each elevator
entrance jamb not compliant.
Provide compliant floor numbering on elevator
door jambs.
• As-Built Description:
• Proposed Solution:
28
407.2.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Handrails
$2855 $1,425LFED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
36
505.2ADA 2010
No handrails to staff area
• Notes:
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
89
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Public Participation Counter
$6,0001 $6,000JOB
43" high
GB02APCODE
4.32.3ADAAG 91
Speaker podium is not accessible. Upper edge of
podium is more than 34" above the finished floor,
and knee space is less than 27" high, 30" wide, and
19" deep.
Provide additional, integrated, and accessible
speaker podium.
• As-Built Description:
• Proposed Solution:
• As-Built:
34
902.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Signage
$2701 $270JOBSA10DPCODE
4.1.3(16)ADAAG 91
At door leading into exit corridor: Where required
exit signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT ROUTE" sign at
door.
• As-Built Description:
• Proposed Solution:
32
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Stages
$75,0001 $75,000JOBGC01APCODE
4.33.5ADAAG 91
Stage, enclosed and unenclosed platform, backstage
areas or orchestra pit not accessible.
Chair lift to raised platform.
• As-Built Description:
• Proposed Solution:
39
206.7.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
90
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
All Gender Restroom7 Staff Only
Accessories
$2251 $225JOB
4" o.c.
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
173
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Door Swing
$15,0001 $15,000JOB
Door width plus 12" to wall
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
174
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
91
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Grab Bars
$1,0201 $1,020JOB
Extends 20" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
172
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Signage
$1501 $150JOB
64" high
SA07PCODE
4.30.6ADAAG 91
Sign not located on latch side of door and/or not
located at 48" min. above to baseline of the lowest
Braille cells and 60" max. to baseline of the highest
line of raised characters.
Provide compliant signage including tactile
characters and Grade II Braille on latch side of door
located at compliant height.
• As-Built Description:
• Proposed Solution:
• As-Built:
175
703.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
170
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
92
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Toilet Stall
$6,0001 $6,000JOB
43" to side wall
WB01APCODE60" min. clearance around a water closet
measured perpendicular from the side wall not
provided (Fixtures are not allowed to overlap this
clearance).
Remove adjacent fixture and provide new enclosure
at accessible water closet.
• As-Built Description:
• Proposed Solution:
• As-Built:
171
604.3.1; 604.3.2ADA 2010
19" between water closet and lavatory.
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
93
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Detective8 Staff Only
Door
$7,5001 $7,500JOB
44" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
179
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
Door Swing
$1501 $150JOB
Door width plus 4" to desk
ID24APCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
180
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
94
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Height
$22550 $11,250LF
32" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
446
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
95
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Interview Room9 Staff Only
General Note
REF
Storage currently
GN01PCODERefer to notes for observation and recommendation.
• As-Built Description:
• Proposed Solution:
• As-Built:
176
If used must provide accessible
• Notes:
Mitigated:
YES
NO
Priority
2
0
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
96
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Kitchen10 Staff Only
Door Swing
$1501 $150JOB
Door width plus 16.5" to cabinet.
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
177
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
97
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Locker Room11 Staff Only
Turning Space
$1,5001 $1,500JOBIH05PCODEThe area does not provide a minimum 60" diameter
turning space within to allow maneuvering through
the space.
Modify area to provide sufficient maneuvering
space.
• As-Built Description:
• Proposed Solution:
178
304.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
98
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Men's Restroom12 Staff Only
Accessories
$3001 $300JOB
PTD: 48" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
186
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Door
$9001 $900JOB
46" high
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
187
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
99
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Door Clearance
$7,8001 $7,800JOB
26" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
182
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Door Swing
$15,0001 $15,000JOB
Door width plus 7" to wall
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
183
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Restroom
?1 $105,000JOB
No accessible stall
WA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
• As-Built:
185
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
100
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
181
Mitigated:
YES
NO
SeverityPriority
3 3
Urinal
$4,5001 $4,500JOB
24" wide clear floor space
WE04PCODE
4.18.3ADAAG 91
30" x 48" clear floor space in front of accessible
urinal not provided.
Provide clear floor space in front of accessible
urinal. Remodel restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
184
605.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
101
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Conference Room13 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
188
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Reach Range
$3001 $300JOB
58" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
189
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
102
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Sally Port14 Staff Only
Ramps
$30030 $9,000SF
Step into jail Room
EB01APCODE
4.1.1ADAAG 91
Ramp needed to provide disabled access at steps or
change of level along path of travel.
Provide new concrete ramp with handrails [slope
more than 1:20 (5.0%) needed].
• As-Built Description:
• Proposed Solution:
• As-Built:
190
303.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
103
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
General Jail Area15 Staff Only
Door Pair
$4,5001 $4,500JOB
29" clear opening width
ID08APCODE
4.13.4ADAAG 91
Pair of doors on accessible route has less than 32"
clear opening width with one leaf open 90°.
Provide new door leaves, unequal in width, to
existing frame for pair of doors.
• As-Built Description:
• Proposed Solution:
• As-Built:
191
404.2.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Fixed Bench
$1,5001 $1,500JOB
16" high, 17" deep
NO06APCODE
4.37.5ADAAG 91
Seat front edge height is not between 17" min. to
19" max. above ground of floor space.
Provide new compliant bench with accessible
dimensions.
• As-Built Description:
• Proposed Solution:
• As-Built:
192
903.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
104
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Fixed Bench
$1,5001 $1,500JOBNO07PCODE
4.32.2ADAAG 91
Clear and level floor or ground space (30" x 48")
not overlapping with other clear space
requirements, is not provided at at least one end of
the bench.
Provide and position a clear and level floor or
ground space to allow wheelchair users to be seated
shoulder-to-shoulder with an individual seated on
the bench.
• As-Built Description:
• Proposed Solution:
19
903.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
General Note
REFGN01PCODERefer to notes for observation and recommendation.
• As-Built Description:
• Proposed Solution:
195
Rest of jail was not being used. If jail becomes
active, access elements must be provided during
that time.
• Notes:Mitigated:
YES
NO
Priority
2
0
Public Counter
$6,0001 $6,000JOB
Counter 42" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
193
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
105
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Public Counter
$6,0001 $6,000JOB
38" high to top of finger printing
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
194
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
Vertical Clearance
$1,5001 $1,500JOB
75" high
EG01PCODE
4.4.2ADAAG 91
Overhead clearance less than 80" above finished
floor.
Modify overhead clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
18
307.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
106
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Women's Restroom16 Staff Only
Accessories
$3001 $300JOB
PTD: 48" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
199
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Door Clearance
$7,8001 $7,800JOB
27" clear width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
198
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
107
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Door Swing
$1501 $150JOB
12" strike
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
202
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Door Swing
$15,0001 $15,000JOB
39" deep
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
197
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Drinking Fountain
$6,0001 $6,000JOB
No high low
IA01APCODE
4.1.3(10)(a)ADAAG 91
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.
Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
• As-Built:
203
211.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
108
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Lavatory
$3601 $360JOBWD05PCODE
4.19.4ADAAG 91
Hot or sharp-surfaced water/drain pipe not insulated
or covered.
Insulate or cover water/drain pipe.
• As-Built Description:
• Proposed Solution:
200
606.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Restroom
?1 $105,000JOBWA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
201
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
Signage
$2701 $270JOBSA11APCODE
4.1.3(16)(a)ADAAG 91
Entrance to toilet or bathing facility not identified
with ADAAG compliant signage.
Provide ADA compliant sign mounted at 48" min.
above to baseline of the lowest Braille cells and 60"
max. to baseline of the highest line of raised
characters on nearest adjacent wall, on latch side of
a single door (located not to cause a Braille reader
to stand within the door swing).
• As-Built Description:
• Proposed Solution:
196
216.8; 703.6.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
109
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
20
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
110
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-1
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:First Floor
Typical Office17 Staff Only
Door Swing
$1501 $150JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
240
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
First Floor $887,835.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
111
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Lobby1 Staff Only
Brochure Bins
$3001 $300JOB
55" high
IN08PCODE
4.2.5 & 6ADAAG 91
Information brochure bins mounted above
accessible height of 48".
Relocate/remount bins at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
122
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Desk
$7,5001 $7,500JOB
42" high
IN02PCODE
4.32.3 & .4ADAAG 91
Accessible fixed table or desk (top 28" to 34" high;
knee space at least 27" high x 19" deep x 30" wide)
not provided.
Provide new fixed accessible table or desk.
• As-Built Description:
• Proposed Solution:
• As-Built:
123
306.1 & 902.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
112
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Door
$7,5001 $7,500JOB
48" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
127
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Door
$9001 $900JOB
48" high
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
46
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Closer
$1,1251 $1,125JOB
12 lbs.
2 seconds
ID03APCODE
4.13.10 &11ADAAG 91
Excessive force required to open door and/or door
closing time of less than 5 seconds.
Provide new door closer adjusted to accessible
standards.
• As-Built Description:
• Proposed Solution:
• As-Built:
48
404.2.8 & 404.2.9ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
113
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Door Hardware
$7501 $750JOB
1" deep
ID07PCODE
4.13.9ADAAG 91
Door does not have accessible operating hardware.
Provide lever handle or other accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
72
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Swing
$15,0001 $15,000JOBID24CPCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Provide door operator.
• As-Built Description:
• Proposed Solution:
47
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Doormat
$1,5001 $1,500JOBID05PCODE
4.5.3ADAAG 91
Doormat hinders access to disabled persons.
Provide new doormat; recess or attach at edges.
• As-Built Description:
• Proposed Solution:
49
302.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
114
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Fire Alarm
$8251 $825JOB
49" high
IC03PCODE
4.2.5ADAAG 91
Fire alarm pull stations not 42"-48" from floor to
center. Note: Required only at new construction,
or where mounting location was or is to be
remodeled.
Remount fire alarm station to be 42" min., and 48"
max. from floor to center.
• As-Built Description:
• Proposed Solution:
• As-Built:
53
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Protrusion Limits
$3002 $600LF
Protrudes 7.5" at 45" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
52
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Reach Range
$3001 $300JOB
52" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
51
308.2.1ADA 2010
Remove chairs
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
115
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Signage
$1501 $150JOB
62" to tactile
SA07PCODE
4.30.6ADAAG 91
Sign not located on latch side of door and/or not
located at 48" min. above to baseline of the lowest
Braille cells and 60" max. to baseline of the highest
line of raised characters.
Provide compliant signage including tactile
characters and Grade II Braille on latch side of door
located at compliant height.
• As-Built Description:
• Proposed Solution:
• As-Built:
126
703.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Signage
$2701 $270JOBSA10APCODE
4.1.3(16)ADAAG 91
At final exit door to exterior: Where required exit
signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT" sign at door.
• As-Built Description:
• Proposed Solution:
50
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Vending Machine
2 REF
55" high
IL02PCODE
4.2.5ADAAG 91
Vending machine coin slot or dispensing outlet,
more than 48" above the floor.
Advise vendor/leasing company to provide
accessible vending machine with highest operable
part at 48" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
121
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
116
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Conference Room 22 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
125
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
124
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
117
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Height
$22520 $4,500LF
33.5" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
55
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Stairway
$4216 $672LFII02BPCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide 2" min., 4" max. wide contrasting color
strip 1" max. from nosing on top & bottom treads
when altering area.
• As-Built Description:
• Proposed Solution:
54
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
118
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Conference Room 13 Staff Only
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
57
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Door
$3001 $300JOBID06PCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Provide 10" min. "kick plate" covering width of
door when altering area.
• As-Built Description:
• Proposed Solution:
131
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
119
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Door
$7,5003 $22,500JOB
48" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
129
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Drinking Fountain
$9,0001 $9,000JOB
6" deep
IA04PCODECA only: Drinking fountain not located in an alcove
(min. 32" wide x 18" deep) or otherwise encroaches
into pedestrian way.
Provide new alcove for drinking fountain, or, if
unreasonable hardship is determined, provide wing
walls or cane-detectable railings on each side of the
drinking fountain. The wings must project out from
the supporting wall at least as far as the drinking
fountain to within 6” of the surface of the
circulation path, but cannot reduce the required
• As-Built Description:
• Proposed Solution:
• As-Built:
144
Mitigated:
YES
NO
SeverityPriority
3 2
Drinking Fountain
$1,5001 $1,500JOBIA05CPCODE
4.4.1ADAAG 91
Drinking fountain lacks protection for visually
impaired persons.
Provide cane-detectable rails.
• As-Built Description:
• Proposed Solution:
130
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
120
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Signage
$1501 $150JOB
Located on door
SA07PCODE
4.30.6ADAAG 91
Sign not located on latch side of door and/or not
located at 48" min. above to baseline of the lowest
Braille cells and 60" max. to baseline of the highest
line of raised characters.
Provide compliant signage including tactile
characters and Grade II Braille on latch side of door
located at compliant height.
• As-Built Description:
• Proposed Solution:
• As-Built:
56
703.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Signage
$1501 $150JOB
60.5"-62" to bottom of tactile
SA07PCODE
4.30.6ADAAG 91
Sign not located on latch side of door and/or not
located at 48" min. above to baseline of the lowest
Braille cells and 60" max. to baseline of the highest
line of raised characters.
Provide compliant signage including tactile
characters and Grade II Braille on latch side of door
located at compliant height.
• As-Built Description:
• Proposed Solution:
• As-Built:
128
703.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
121
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
All Gender Restrooms4 Staff Only
Accessories
$2251 $225JOB
18" high and 12" o.c.
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
135
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Cooktops
$1,9501 $1,950JOBKF15PCODE
13.3.4(6)ADAAG 91
Cooktop controls require reaching across the
burners.
Provide cooktop with accessible controls.
• As-Built Description:
• Proposed Solution:
61
804.6.2ADA 2010
Range not front controls
• Notes:Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
122
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Door
$7,5001 $7,500JOB
49" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
58
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Swing
$15,0001 $15,000JOB
57" from face of door
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
137
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Grab Bars
$1,0201 $1,020JOB
Extends 21" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
133
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
123
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Grab Bars
$2251 $225JOBWB07IPCODE
4.26.2ADAAG 91
Accessories/dispensers in accessible stall located
closer than 1-1/2" below or 12" above grab bar
impedes its use.
Relocate accessories/dispensers to be no closer than
1-1/2" below and 12" above grab bars (except if
accessories are recessed, flush with wall, and have
no sharp edges).
• As-Built Description:
• Proposed Solution:
134
609.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Protrusion Limits
$3003 $900LF
TV protrudes 6" at 60" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
65
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Public Counter
$6,0001 $6,000JOB
36" high
IN03APCODE
4.32.3 & 4ADAAG 91
Sales and service counter: Accessible section not
provided (knee space min. 27" high x 19" deep x
30" wide)
Retrofit existing counter to provide accessible
seating section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
60
306.3; 904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
124
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Reach Range
$3001 $300JOB
68" high
IE02PCODE
4.2.6ADAAG 91
Reach height to control or access point, where side
approach is available, exceeds 48" or is less than
15" in height, or exceeds 10" in depth.
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
62
308.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Signage
$2701 $270JOB
Exit sign should say exit route
SA10DPCODE
4.1.3(16)ADAAG 91
At door leading into exit corridor: Where required
exit signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT ROUTE" sign at
door.
• As-Built Description:
• Proposed Solution:
• As-Built:
59
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Sink
$5,2501 $5,250JOB
Top: 36" high
IN06PCODE
4.24.2ADAAG 91
Sink rim higher than 34" above floor.
Remodel sink cabinet to lower sink.
• As-Built Description:
• Proposed Solution:
• As-Built:
64
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
125
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Sink
$5,2501 $5,250JOB
Knee space: none
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
63
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Toilet Stall
$6,0001 $6,000JOB
24" between water closet and lavatory,
45" side wall
WB01PCODELess than 32" from side of water closet to far side
of stall wall or 28" to adjacent fixture.
Relocate water closet. Remodel restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
132
Mitigated:
YES
NO
SeverityPriority
3 3
Water Closet
$15,0001 $15,000JOB
46" in front of water closet
WB03APCODECA only: In single-accommodation restroom less
than 48" in front of water closet provided.
Remodel restroom to provide at least 48" in front of
water closet.
• As-Built Description:
• Proposed Solution:
• As-Built:
136
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
126
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
All Gender Restrooms5 Staff Only
Accessories
$2251 $225JOB
16" o.c.
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
142
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Door Swing
$15,0001 $15,000JOB
57" from face of door
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
138
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
127
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Grab Bars
$1,0201 $1,020JOB
Extends 21" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
140
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Grab Bars
$2251 $225JOBWB07IPCODE
4.26.2ADAAG 91
Accessories/dispensers in accessible stall located
closer than 1-1/2" below or 12" above grab bar
impedes its use.
Relocate accessories/dispensers to be no closer than
1-1/2" below and 12" above grab bars (except if
accessories are recessed, flush with wall, and have
no sharp edges).
• As-Built Description:
• Proposed Solution:
141
609.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Public Counter
$6,0001 $6,000JOB
36" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
66
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
128
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Toilet Stall
$6,0001 $6,000JOB
52" wide
WB01PCODELess than 32" from side of water closet to far side
of stall wall or 28" to adjacent fixture.
Relocate water closet. Remodel restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
139
25" between water closet and lavatory.
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 3
Water Closet
$15,0001 $15,000JOB
45" in front of water closet
WB03APCODECA only: In single-accommodation restroom less
than 48" in front of water closet provided.
Remodel restroom to provide at least 48" in front of
water closet.
• As-Built Description:
• Proposed Solution:
• As-Built:
143
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
129
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
All Gender Restroom6 Staff Only
Accessories
$3001 $300JOB
SD: 42" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
70
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Accessories
$2251 $225JOB
TPD: 17" high
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
71
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
130
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Door
$7,5001 $7,500JOB
48" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
145
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Door Swing
$1501 $150JOB
46" from face of door to cabinet.
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
68
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Lavatory
$2,7001 $2,700JOB
Top: 35" high
WD02APCODE
4.19.2ADAAG 91
Lavatory: Fixture rim or counter height more than
34" above floor.
Remount compliant fixture at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
9
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
131
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Lavatory
$10,2001 $10,200JOB
Knee space: 27" high
WD04PCODE
Fig. 31ADAAG 91
Knee clearance 27" min. high starting 8" back from
the front edge of the lavatory towards the wall is
not provided.
Provide new accessible lavatory. Remodel restroom
as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
69
306.3.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Public Counter
$6,0001 $6,000JOB
36" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
146
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Signage
$2701 $270JOB
Does not contrast with door
SA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
• As-Built:
67
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
132
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Women's Restroom7 Staff Only
Accessories
$2251 $225JOB
Behind water closet
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
156
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
Door Swing
$1501 $150JOB
52" from face of door
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
149
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
133
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Grab Bars
$1,0201 $1,020JOB
Extends 22" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
154
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Grab Bars
$2251 $225JOBWB07IPCODE
4.26.2ADAAG 91
Accessories/dispensers in accessible stall located
closer than 1-1/2" below or 12" above grab bar
impedes its use.
Relocate accessories/dispensers to be no closer than
1-1/2" below and 12" above grab bars (except if
accessories are recessed, flush with wall, and have
no sharp edges).
• As-Built Description:
• Proposed Solution:
155
609.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Protrusion Limits
$3001 $300JOB
Shelf protrudes 8" at 34" high
EG04PCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
147
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
134
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Ramp
$13510 $1,350SF
52" long
EB07APCODETop landing less than 60" long. (CA only: 60" x
60").
Modify ramp top landing to 60" in length and 60"
wide.
• As-Built Description:
• Proposed Solution:
• As-Built:
74
405.7.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Slope
$30030 $9,000SF
9.5%
EB02PCODE
4.8.2ADAAG 91
Slope greater than 1:12 (8.3%).
Demolish existing and provide new ramp with
handrails.
• As-Built Description:
• Proposed Solution:
• As-Built:
73
405.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Stairway
$4212 $504LFII02BPCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide 2" min., 4" max. wide contrasting color
strip 1" max. from nosing on top & bottom treads
when altering area.
• As-Built Description:
• Proposed Solution:
75
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
135
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Toilet Stall
$4,5001 $4,500JOB
58" wide, 31" side
WB06PCODE
4.17.3ADAAG 91
Toilet stall less than 60" wide.
Provide new accessible stall.
• As-Built Description:
• Proposed Solution:
• As-Built:
153
604.8.1.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Turning Space
$1,5001 $1,500JOBIH05PCODEThe area does not provide a minimum 60" diameter
turning space within to allow maneuvering through
the space.
Modify area to provide sufficient maneuvering
space.
• As-Built Description:
• Proposed Solution:
148
304.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Water Closet
$1,5001 $1,500JOB
18.5" o.c.
WB02CPCODE
Fig. 28ADAAG 91
Water closet not 16"-18" (CA: 17"-18") from near
side wall to center line of water closet (2010
ADAAG: 16"-18").
Relocate existing water closet and plumbing,
remount with offset closet flange to provide 18"
max. from side wall.
• As-Built Description:
• Proposed Solution:
• As-Built:
150
604.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
136
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Water Closet
$15,0001 $15,000JOB
47" in front of water closet
WB03APCODECA only: In single-accommodation restroom less
than 48" in front of water closet provided.
Remodel restroom to provide at least 48" in front of
water closet.
• As-Built Description:
• Proposed Solution:
• As-Built:
151
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
137
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Men's Restroom8 Staff Only
Accessories
$2251 $225JOB
Behind water closet
WG02PCODE
4.16.6ADAAG 91
Toilet paper dispenser less than 15" (CA: 19") or
more than 48" above floor or not within 7" to 9"
from front of water closet (Note: CA pre-2010 is
allowed within 12" from front of water closet).
Relocate or provide new toilet paper dispenser.
• As-Built Description:
• Proposed Solution:
• As-Built:
162
604.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
Door
$7,5002 $15,000JOB
53" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
91
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
138
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Door
$9001 $900JOB
48" high o.c.
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
76
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Swing
$1501 $150JOB
52" from face of door
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
157
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Doormat
$1,5001 $1,500JOBID05PCODE
4.5.3ADAAG 91
Doormat hinders access to disabled persons.
Provide new doormat; recess or attach at edges.
• As-Built Description:
• Proposed Solution:
77
302.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
139
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Drinking Fountain
$6,0001 $6,000JOBIA01APCODE
4.1.3(10)(a)ADAAG 91
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.
Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
78
211.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Grab Bars
$1,0201 $1,020JOB
Extends 21" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
160
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Grab Bars
$2251 $225JOBWB07IPCODE
4.26.2ADAAG 91
Accessories/dispensers in accessible stall located
closer than 1-1/2" below or 12" above grab bar
impedes its use.
Relocate accessories/dispensers to be no closer than
1-1/2" below and 12" above grab bars (except if
accessories are recessed, flush with wall, and have
no sharp edges).
• As-Built Description:
• Proposed Solution:
161
609.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
140
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Signage
$1506 $900JOBSA07PCODE
4.30.6ADAAG 91
Sign not located on latch side of door and/or not
located at 48" min. above to baseline of the lowest
Braille cells and 60" max. to baseline of the highest
line of raised characters.
Provide compliant signage including tactile
characters and Grade II Braille on latch side of door
located at compliant height.
• As-Built Description:
• Proposed Solution:
92
703.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Toilet Stall
$4,5001 $4,500JOB
58" wide
WB06PCODE
4.17.3ADAAG 91
Toilet stall less than 60" wide.
Provide new accessible stall.
• As-Built Description:
• Proposed Solution:
• As-Built:
158
604.8.1.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Water Closet
$15,0001 $15,000JOB
47" in front of water closet
WB03APCODECA only: In single-accommodation restroom less
than 48" in front of water closet provided.
Remodel restroom to provide at least 48" in front of
water closet.
• As-Built Description:
• Proposed Solution:
• As-Built:
159
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
141
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Men's Restroom9 Staff Only
Accessories
$4501 $450JOB
42" high
WG03PCODE
4.19.6ADAAG 91
Bottom of mirror located above lavatories or
countertops more than 40" above floor.
Relocate or provide new accessible mirror.
• As-Built Description:
• Proposed Solution:
• As-Built:
81
603.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Cooktops
$1,9501 $1,950JOB
Controls over burner
KF15PCODE
13.3.4(6)ADAAG 91
Cooktop controls require reaching across the
burners.
Provide cooktop with accessible controls.
• As-Built Description:
• Proposed Solution:
• As-Built:
164
804.6.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
142
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Door Swing
$1,5001 $1,500JOB
Door width plus 4" to partition.
ID23PCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Change door swing.
• As-Built Description:
• Proposed Solution:
• As-Built:
83
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Electrical
$9001 $900JOB
50" high
IC01PCODE
4.2.5 & 6ADAAG 91
Electric switch or control mounted less than 15"
measured to the bottom of the outlet box or greater
than 48 inches measured to the top of the outlet
box.
Relocate light switches or control to between 15"
and 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
167
308.2.1 & 308.2.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Grab Bars
$1,0201 $1,020JOB
Extends 20" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
86
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
143
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Non-Fixed Desk
$4,8001 $4,800JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
163
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Protrusion Limits
$3004 $1,200LF
Shelf protrudes 12" at 42" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
80
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
Reach Range
$3001 $300JOB
50" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
166
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
144
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Sink
$5,2501 $5,250JOB
Knee space: none
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
165
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Urinal
$4,5001 $4,500JOB
29" wide
WE04PCODE
4.18.3ADAAG 91
30" x 48" clear floor space in front of accessible
urinal not provided.
Provide clear floor space in front of accessible
urinal. Remodel restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
82
605.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Water Closet
$1,5001 $1,500JOB
19.5" o.c.
WB02CPCODE
Fig. 28ADAAG 91
Water closet not 16"-18" (CA: 17"-18") from near
side wall to center line of water closet (2010
ADAAG: 16"-18").
Relocate existing water closet and plumbing,
remount with offset closet flange to provide 18"
max. from side wall.
• As-Built Description:
• Proposed Solution:
• As-Built:
85
604.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
145
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Wheelchair Clearance
$5102 $1,020LF
42.5" wide
WC02APCODE
4.3.3ADAAG 91
Clear passage width (except doorways) from rest
room entry to accessible water closet compartment
less than 36" (CA only: 44" wide).
Modify facility passage to be min. 44" wide.
Demolish existing partition and replace.
• As-Built Description:
• Proposed Solution:
• As-Built:
79
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
146
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Women's Restroom10 Staff Only
Accessories
$4501 $450JOB
40.5" high
WG03PCODE
4.19.6ADAAG 91
Bottom of mirror located above lavatories or
countertops more than 40" above floor.
Relocate or provide new accessible mirror.
• As-Built Description:
• Proposed Solution:
• As-Built:
106
603.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Door Swing
$1,5001 $1,500JOB
Door width plus 8" to partition
ID23PCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Change door swing.
• As-Built Description:
• Proposed Solution:
• As-Built:
107
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
147
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Door Swing
$1501 $150JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
104
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Grab Bars
$1,0201 $1,020JOB
Extends 21" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
108
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Height
$22570 $15,750LF
33" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
168
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
148
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Reach Range
$3001 $300JOB
62" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
105
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Signage
$2701 $270JOBSA10APCODE
4.1.3(16)ADAAG 91
At final exit door to exterior: Where required exit
signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT" sign at door.
• As-Built Description:
• Proposed Solution:
169
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
149
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Employee Break Room11 Staff Only
Cooktops
$1,9501 $1,950JOBKF15PCODE
13.3.4(6)ADAAG 91
Cooktop controls require reaching across the
burners.
Provide cooktop with accessible controls.
• As-Built Description:
• Proposed Solution:
87
804.6.2ADA 2010
Stove requires reach over burner
• Notes:Mitigated:
YES
NO
SeverityPriority
4 2
Door Swing
$1501 $150JOB
Door width plus 12" to boxes
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
241
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
150
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Door Swing
$1501 $150JOB
Door width plus 13" to boxes
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
243
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Non-Fixed Desk
$4,8001 $4,800JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
90
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Reach Range
$3001 $300JOB
44" high and 23" reach depth
IE02PCODE
4.2.6ADAAG 91
Reach height to control or access point, where side
approach is available, exceeds 48" or is less than
15" in height, or exceeds 10" in depth.
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
89
308.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
151
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Sink
$5,2501 $5,250JOB
Remove cabinets
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
88
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
152
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Typical Office12 Staff Only
Door Swing
$1505 $750JOB
48" from face of door
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
244
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Reach Range
$3001 $300JOB
50" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
93
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
153
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Signage
$1501 $150JOBSA07PCODE
4.30.6ADAAG 91
Sign not located on latch side of door and/or not
located at 48" min. above to baseline of the lowest
Braille cells and 60" max. to baseline of the highest
line of raised characters.
Provide compliant signage including tactile
characters and Grade II Braille on latch side of door
located at compliant height.
• As-Built Description:
• Proposed Solution:
246
703.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
154
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Conference Room13 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
95
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
94
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
155
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Door Swing
$1503 $450JOB
44" from face of door
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
248
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Non-Fixed Desk
$4,8001 $4,800JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
97
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
Protrusion Limits
$3004 $1,200LF
Protrudes 4.5" at 33" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
96
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
156
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Public Counter
$6,0001 $6,000JOB
42" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
247
904.4ADA 2010
Staff Only
• Notes:
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
157
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Employee Area14 Staff Only
Corridor
$1501 $150JOB
35" wide
IH03APCODE
4.3.3ADAAG 91
Corridor, for occupant load less than 10, less than
36" wide.
Remove or relocate furniture and storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
100
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Door Swing
$1501 $150JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
99
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
158
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Door Swing
$1503 $450JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
252
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Non-Fixed Desk
$4,8001 $4,800JOB
Knee space: 13" deep
IN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
• As-Built:
98
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Non-Fixed Desk
$4,8001 $4,800JOB
Knee space: 15" wide
IN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
• As-Built:
101
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
159
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Protrusion Limits
$3006 $1,800LF
Protrudes 4.5" at 30" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
102
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Protrusion Limits
$3004 $1,200LF
Protrudes 6" at 42" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
251
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Public Counter
$6,0001 $6,000JOB
43" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
250
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
160
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Signage
$2701 $270JOBSA10DPCODE
4.1.3(16)ADAAG 91
At door leading into exit corridor: Where required
exit signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT ROUTE" sign at
door.
• As-Built Description:
• Proposed Solution:
249
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
161
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
East
Conference Room15 Staff Only
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
255
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Protrusion Limits
$3004 $1,200LF
Protrudes 6" at 42" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
103
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
162
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Public Health and Safety Office16 Staff Only
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
109
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Door Swing
$1,5001 $1,500JOB
12" pull depth
ID23PCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Change door swing.
• As-Built Description:
• Proposed Solution:
• As-Built:
110
404.2.4ADA 2010
Make swing both ways
• Notes:
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
163
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Door Swing
$15,0001 $15,000JOB
Counter in pull strike landing
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
119
404.2.4ADA 2010
Staff door
• Notes:
Mitigated:
YES
NO
SeverityPriority
2 4
General Note
REFGN01PCODERefer to notes for observation and recommendation.
• As-Built Description:
• Proposed Solution:
120
Relocate chairs outside of lowered counter clear
space.
• Notes:Mitigated:
YES
NO
Priority
2
0
Non-Fixed Desk
$4,8001 $4,800JOB
Knee space: 13" deep
IN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
• As-Built:
112
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
164
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Protrusion Limits
$3001 $300LF
Protrudes 7" at 37" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
111
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
165
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Break Room17 Staff Only
Reach Range
$3001 $300JOB
48" high over obstruction
IE02PCODE
4.2.6ADAAG 91
Reach height to control or access point, where side
approach is available, exceeds 48" or is less than
15" in height, or exceeds 10" in depth.
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
114
308.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Sink
$5,2501 $5,250JOB
Knee space: 26.5" high at bowl
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
113
606.2ADA 2010
Remove cabinets
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
166
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Conference Room18 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
116
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
117
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
167
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Non-Fixed Desk
$4,8001 $4,800JOB
Knee space: 13" wide
IN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
• As-Built:
115
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
Protrusion Limits
$3005 $1,500LF
Protrudes 4.5" at 35" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
118
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
168
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Fire Department19 Staff Only
Assistive Listening
REF
ASL
GI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
• As-Built:
296
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Door Swing
$1501 $150JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
297
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
169
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-2
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Second Floor
Fire Department Employee Space20 Staff Only
Non-Fixed Desk
$4,8001 $4,800JOB
Knee space: 13" wide
IN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
• As-Built:
298
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Second Floor $423,441.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
170
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Public Utilities1 Staff Only
Protrusion Limits
$3004 $1,200LF
Protrudes 6" at 42" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
257
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Public Counter
$6,0001 $6,000JOB
43" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
256
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
171
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Sink
$5,2501 $5,250JOB
Top: 39" high
IN06PCODE
4.24.2ADAAG 91
Sink rim higher than 34" above floor.
Remodel sink cabinet to lower sink.
• As-Built Description:
• Proposed Solution:
• As-Built:
258
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
Sink
$1501 $150JOB
9" o.c.
IN06EPCODE
4.24.5ADAAG 91
No min. 30" x 48" clear floor or ground space for
forward or parallel approach.
Relocate object to provide path to sink
• As-Built Description:
• Proposed Solution:
• As-Built:
259
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
172
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Admin Office2 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
261
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Door Swing
$1501 $150JOB
Door width plus 9" to cabinet
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
262
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
173
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Non-Fixed Desk
$4,8001 $4,800JOB
Knee space: 13" wide
IN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
• As-Built:
260
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
174
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Assistant Manager Office3 Staff Only
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
264
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Non-Fixed Desk
$4,8001 $4,800JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
263
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
175
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Utilities Compliance4 Staff Only
Door Swing
$1,5001 $1,500JOB
Door width plus 7" to wall
ID23PCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Change door swing.
• As-Built Description:
• Proposed Solution:
• As-Built:
265
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
176
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Conference Room 45 Staff Only
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
266
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
177
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Women's Restroom6 Staff Only
Door Swing
REF
51" from face of door
ID23CREFPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
269
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Door Swing
$15,0001 $15,000JOB
Door width plus 24" to drinking
fountain
ID24CPCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Provide door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
267
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
178
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Door Threshold
$7501 $750JOB
0.5" high
ID02PCODE
4.1.6(3)(d)(ii)ADAAG 91
Existing threshold at door is 1/2" high or less but
without a beveled edge on both sides.
Modify threshold to have beveled edge on each
side.
• As-Built Description:
• Proposed Solution:
• As-Built:
283
404.2.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Lavatory
$2,7001 $2,700JOB
Top: 34.5" high
WD02APCODE
4.19.2ADAAG 91
Lavatory: Fixture rim or counter height more than
34" above floor.
Remount compliant fixture at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
270
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Signage
$2701 $270JOBSA11APCODE
4.1.3(16)(a)ADAAG 91
Entrance to toilet or bathing facility not identified
with ADAAG compliant signage.
Provide ADA compliant sign mounted at 48" min.
above to baseline of the lowest Braille cells and 60"
max. to baseline of the highest line of raised
characters on nearest adjacent wall, on latch side of
a single door (located not to cause a Braille reader
to stand within the door swing).
• As-Built Description:
• Proposed Solution:
268
216.8; 703.6.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
179
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Stall Door
$751 $75JOBWB05BPCODE
4.22.4ADAAG 91
Stall door to accessible compartment not self
closing.
Adjust closer.
• As-Built Description:
• Proposed Solution:
272
604.8.1.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Stall Door
$3001 $300JOBWB05CPCODE
4.17.5ADAAG 91
Stall door does not have accessible operating
hardware (U-pulls on both sides, flip-over or sliding
lock).
Provide new accessible locking hardware that does
not require grasping, pinching, or twisting and U-
pulls on both sides.
• As-Built Description:
• Proposed Solution:
273
604.8.1.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Water Closet
$1,5001 $1,500JOB
19" o.c.
WB02CPCODE
Fig. 28ADAAG 91
Water closet not 16"-18" (CA: 17"-18") from near
side wall to center line of water closet (2010
ADAAG: 16"-18").
Relocate existing water closet and plumbing,
remount with offset closet flange to provide 18"
max. from side wall.
• As-Built Description:
• Proposed Solution:
• As-Built:
271
604.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
180
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Men's Restroom7 Staff Only
Coat Hook
$1501 $150JOB
70" high
WG03APCODE
4.2.5ADAAG 91
Accessible coat hook not within reach range.
Adjust existing or provide new coat hook at
maximum 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
282
603.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
Door Threshold
$7501 $750JOB
0.5" vertical
ID02PCODE
4.1.6(3)(d)(ii)ADAAG 91
Existing threshold at door is 1/2" high or less but
without a beveled edge on both sides.
Modify threshold to have beveled edge on each
side.
• As-Built Description:
• Proposed Solution:
• As-Built:
275
404.2.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
181
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Lavatory
$2,7001 $2,700JOB
Top: 34.5" high
WD02APCODE
4.19.2ADAAG 91
Lavatory: Fixture rim or counter height more than
34" above floor.
Remount compliant fixture at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
276
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Lavatory
$3601 $360JOBWD05PCODE
4.19.4ADAAG 91
Hot or sharp-surfaced water/drain pipe not insulated
or covered.
Insulate or cover water/drain pipe.
• As-Built Description:
• Proposed Solution:
277
606.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Protrusion Limits
$3004 $1,200LF
Shelf protrudes 12" at 48" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
278
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
182
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Signage
$2701 $270JOBSA11APCODE
4.1.3(16)(a)ADAAG 91
Entrance to toilet or bathing facility not identified
with ADAAG compliant signage.
Provide ADA compliant sign mounted at 48" min.
above to baseline of the lowest Braille cells and 60"
max. to baseline of the highest line of raised
characters on nearest adjacent wall, on latch side of
a single door (located not to cause a Braille reader
to stand within the door swing).
• As-Built Description:
• Proposed Solution:
274
216.8; 703.6.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Stall Door
$751 $75JOBWB05BPCODE
4.22.4ADAAG 91
Stall door to accessible compartment not self
closing.
Adjust closer.
• As-Built Description:
• Proposed Solution:
279
604.8.1.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Stall Door
$3001 $300JOBWB05CPCODE
4.17.5ADAAG 91
Stall door does not have accessible operating
hardware (U-pulls on both sides, flip-over or sliding
lock).
Provide new accessible locking hardware that does
not require grasping, pinching, or twisting and U-
pulls on both sides.
• As-Built Description:
• Proposed Solution:
280
604.8.1.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
183
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Water Closet
$1,5001 $1,500JOB
19.5" o.c.
WB02CPCODE
Fig. 28ADAAG 91
Water closet not 16"-18" (CA: 17"-18") from near
side wall to center line of water closet (2010
ADAAG: 16"-18").
Relocate existing water closet and plumbing,
remount with offset closet flange to provide 18"
max. from side wall.
• As-Built Description:
• Proposed Solution:
• As-Built:
281
604.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
184
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Break Room8 Staff Only
Reach Range
$3001 $300JOB
60" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
286
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Reach Range
$3001 $300JOB
50" high over obstruction
IE02PCODE
4.2.6ADAAG 91
Reach height to control or access point, where side
approach is available, exceeds 48" or is less than
15" in height, or exceeds 10" in depth.
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
285
308.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
185
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Sink
$5,2501 $5,250JOB
Knee space: 24" high
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
284
606.2ADA 2010
Remove cabinets
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
186
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Hallway9 Staff Only
Door
$7,5001 $7,500JOB
59" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
290
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 1
Fire Alarm
$8251 $825JOB
53" high
IC03PCODE
4.2.5ADAAG 91
Fire alarm pull stations not 42"-48" from floor to
center. Note: Required only at new construction,
or where mounting location was or is to be
remodeled.
Remount fire alarm station to be 42" min., and 48"
max. from floor to center.
• As-Built Description:
• Proposed Solution:
• As-Built:
288
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
187
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Signage
$2701 $270JOBSA10BPCODE
4.1.3(16)ADAAG 91
At door leading into exit stairway: Where required
exit signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT STAIR
UP/DOWN" sign at door.
• As-Built Description:
• Proposed Solution:
287
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
188
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Engineering10 Staff Only
Assistive Listening
REF
ASL
GI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
• As-Built:
292
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Door Swing
$1504 $600JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
291
404.2.4ADA 2010
Door landing obstructed
• Notes:
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
189
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Resource Management11 Staff Only
Door Swing
$1501 $150JOB
54" from face of door
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
293
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
Door Swing
$1501 $150JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
294
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
190
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Non-Fixed Desk
$4,8001 $4,800JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
295
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
Third Floor $72,495.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
191
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
Interior $1,740,576.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
192
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
1-1-3
City Hall Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Third Floor
City Hall $1,808,676.00Facility:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
193
City Yard - Maintenance Building 1
4305 S Santa Fe
Access Compliance Survey Report
City of Vernon
October 2020
SSA Project #:19033.00
6Facility #:
194
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 6-0-1
Exterior- On-Site
City Yard - Maintenance Building 1
4305 S SANTA FE
AVE
VERNON, CA
90058
CITY YARD -
MAINENANCE
BUILDING 1
6-0-1
1
2
195
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 6-1-1
Interior- First Floor
City Yard - Maintenance Building 1
4305 S SANTA FE
AVE
VERNON, CA
90058
CITY YARD -
MAINTENANCE
BUILDING 1
6-1-1 NO FLOOR PLANS PROVIDED 196
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-0-1
City Yard - Maintenance Building 1 Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:On-site
General Warehouse Exterior1 Staff Only
Accessible Route
$7540 $3,000SF
4.5% cross slope
EF07PCODE
4.3.7ADAAG 91
Cross slope more than 1":48" (2.083%).
Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
368
403.3ADA 2010
Path of travel between buildings
• Notes:Mitigated:
YES
NO
SeverityPriority
1 3
Minimum Number
$9001 $900JOB
No accessible parking.
EA01APCODE
4.1.2(5)ADAAG 91
At parking lot with 1-25 spaces, the number of
accessible spaces is less than required by code; 1
space required
Provide required accessible parking space with sign
including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
• As-Built:
367
208.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
197
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-0-1
City Yard - Maintenance Building 1 Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:On-site
Main Warehouse2 Staff Only
Reach Range
$3001 $300JOB
16" reach depth
IE02PCODE
4.2.6ADAAG 91
Reach height to control or access point, where side
approach is available, exceeds 48" or is less than
15" in height, or exceeds 10" in depth.
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
366
308.3.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
On-site $4,200.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
198
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-0-1
City Yard - Maintenance Building 1 Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:On-site
Exterior $4,200.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
199
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Office Building Entrance1 Staff Only
Door
$12020 $2,400SF
3.3%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
369
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Doormat
$1,5001 $1,500JOBID05PCODE
4.5.3ADAAG 91
Doormat hinders access to disabled persons.
Provide new doormat; recess or attach at edges.
• As-Built Description:
• Proposed Solution:
370
302.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
200
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Lobby2 Staff Only
Electrical
$9001 $900JOB
50" to top
IC01PCODE
4.2.5 & 6ADAAG 91
Electric switch or control mounted less than 15"
measured to the bottom of the outlet box or greater
than 48 inches measured to the top of the outlet
box.
Relocate light switches or control to between 15"
and 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
373
308.2.1 & 308.2.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Signage
$2701 $270JOBSA10APCODE
4.1.3(16)ADAAG 91
At final exit door to exterior: Where required exit
signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT" sign at door.
• As-Built Description:
• Proposed Solution:
371
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
201
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Vending Machine
2 REF
49"-52" high
IL02PCODE
4.2.5ADAAG 91
Vending machine coin slot or dispensing outlet,
more than 48" above the floor.
Advise vendor/leasing company to provide
accessible vending machine with highest operable
part at 48" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
372
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
202
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Men's Restroom3 Staff Only
Accessories
$3001 $300JOB
PTD: 55" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
376
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Door Swing
$15,0001 $15,000JOB
57" from face of door
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
374
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
203
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Grab Bars
$1,0201 $1,020JOB
Extends 21" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
378
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Grab Bars
$2251 $225JOBWB07IPCODE
4.26.2ADAAG 91
Accessories/dispensers in accessible stall located
closer than 1-1/2" below or 12" above grab bar
impedes its use.
Relocate accessories/dispensers to be no closer than
1-1/2" below and 12" above grab bars (except if
accessories are recessed, flush with wall, and have
no sharp edges).
• As-Built Description:
• Proposed Solution:
379
609.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Lavatory
$10,2001 $10,200JOB
Apron: 28" high
WD03PCODE
4.19.2ADAAG 91
Wheelchair clearance under lavatory apron or
lavatory counter front edge less than 29" high.
Provide new accessible lavatory. Remodel
restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
375
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
204
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Locker Facilities
$2,2501 $2,250JOB
12" wide bench no back
GG03PCODE
4.35.4ADAAG 91
No section of bench provided adjacent to
designated accessible locker, measuring minimum
20-24” deep, 48” wide, and 17-19” high, and fixed
to a wall along the longer dimension.
Provide a new bench, fixed to a wall along the
longer dimension, close to the accessible locker.
• As-Built Description:
• Proposed Solution:
• As-Built:
380
803.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Semi-Ambulant Stall
$5,7001 $5,700JOBWB06APCODE
4.22.4ADAAG 91
Semi-Ambulant stall with 35-37" width, minimum
60" depth, parallel grab bars, and out-swinging door
not provided (one required where 6 or more exist).
Provide 36" wide stall with out-swinging door and
two side grab bars. Remodel restroom as needed.
• As-Built Description:
• Proposed Solution:
377
213.3.1 & 604.8.2ADA 2010
6 units, no semi-ambulant
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 2
Shower
$1,5001 $1,500JOB
18" o.c.
WF05BPCODEMounting height of shower spray bracket exceeds
48" max. height or is not 19" - 27" from rear edge
of folding seat.
Provide or remount shower spray bracket within
27" from rear edge of seat and at 48" max. height.
• As-Built Description:
• Proposed Solution:
• As-Built:
381
608.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
205
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Shower
$1,5001 $1,500JOB
2.6%
WF06APCODEFloor surface sloped greater than 2.0% (1:48) due
to drain.
Remodel floor surface to compliance.
• As-Built Description:
• Proposed Solution:
• As-Built:
383
608.9ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
206
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Women's Restroom4 Staff Only
Accessories
$4501 $450JOB
41" high
WG03PCODE
4.19.6ADAAG 91
Bottom of mirror located above lavatories or
countertops more than 40" above floor.
Relocate or provide new accessible mirror.
• As-Built Description:
• Proposed Solution:
• As-Built:
386
603.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Coat Hook
$1501 $150JOB
64" high
WG03APCODE
4.2.5ADAAG 91
Accessible coat hook not within reach range.
Adjust existing or provide new coat hook at
maximum 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
390
603.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
207
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Cooktops
$1,9501 $1,950JOBKF15PCODE
13.3.4(6)ADAAG 91
Cooktop controls require reaching across the
burners.
Provide cooktop with accessible controls.
• As-Built Description:
• Proposed Solution:
33
804.6.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Swing
$1501 $150JOB
Door width plus 13" to bins
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
37
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Door Swing
$15,0001 $15,000JOB
57" from face of door
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
384
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
208
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Grab Bars
$1,0201 $1,020JOB
Extends 21" from centerline of water
closet
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
388
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Grab Bars
$2251 $225JOBWB07IPCODE
4.26.2ADAAG 91
Accessories/dispensers in accessible stall located
closer than 1-1/2" below or 12" above grab bar
impedes its use.
Relocate accessories/dispensers to be no closer than
1-1/2" below and 12" above grab bars (except if
accessories are recessed, flush with wall, and have
no sharp edges).
• As-Built Description:
• Proposed Solution:
389
609.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 4
Lavatory
$10,2001 $10,200JOB
Apron: 28.5" high
WD03PCODE
4.19.2ADAAG 91
Wheelchair clearance under lavatory apron or
lavatory counter front edge less than 29" high.
Provide new accessible lavatory. Remodel
restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
385
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
209
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Reach Range
$3001 $300JOB
64" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
34
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Reach Range
$3001 $300JOB
70" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
35
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Reach Range
$3001 $300JOB
50" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
36
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
210
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Sink
$5,2501 $5,250JOBIN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
32
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Wheelchair Clearance
$5104 $2,040LF
42" wide
WC02APCODE
4.3.3ADAAG 91
Clear passage width (except doorways) from rest
room entry to accessible water closet compartment
less than 36" (CA only: 44" wide).
Modify facility passage to be min. 44" wide.
Demolish existing partition and replace.
• As-Built Description:
• Proposed Solution:
• As-Built:
387
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
211
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Staff Area5 Staff Only
Door Swing
$1501 $150JOB
36" from face of door to cabinet
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
38
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Public Counter
$6,0001 $6,000JOB
Top: 44" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
39
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
212
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Office Near Break Room6 Staff Only
Door Swing
$1501 $150JOB
36" from the face of door to desk
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
40
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
213
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Office Space Near Garage Side7 Staff Only
Brochure Bins
$3001 $300JOB
60" high
IN08PCODE
4.2.5 & 6ADAAG 91
Information brochure bins mounted above
accessible height of 48".
Relocate/remount bins at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
41
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Corridor
$1501 $150JOB
31" wide
IH03APCODE
4.3.3ADAAG 91
Corridor, for occupant load less than 10, less than
36" wide.
Remove or relocate furniture and storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
44
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
214
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Protrusion Limits
$3007 $2,100LF
Shelf protrudes 4.5" at 42" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
43
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
215
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Inventory Garage8 Staff Only
Door
$12020 $2,400SF
3.1%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
46
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
45
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
216
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Reach Range
$3001 $300JOB
52" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
47
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
First Floor $92,400.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
217
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Interior $92,400.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
218
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
6-1-1
City Yard - Maintenance Building 1 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
City Yard - Maintenance Building 1 $96,600.00Facility:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
219
City Yard - Maintenance Building 2
4305 S Santa Fe
Access Compliance Survey Report
City of Vernon
October 2020
SSA Project #:19033.00
7Facility #:
220
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 7-0-1
Exterior- On-Site
City Yard - Maintenance Building 2
4305 S SANTA FE
AVE
VERNON, CA
90058
CITY YARD -
MAINTENANCE
BUILDING 2
7-0-1
221
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 7-1-1
Interior- First Floor
City Yard - Maintenance Building 2
4305 S SANTA FE
AVE
VERNON, CA
90058
CITY YARD -
MAINTENANCE
BUILDING 2
7-1-1 NO FLOOR PLANS PROVIDED 222
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
General0 Staff Only
Door Closer
$1,1251 $1,125JOB
10 lbs.
ID03APCODE
4.13.10 &11ADAAG 91
Excessive force required to open door and/or door
closing time of less than 5 seconds.
Provide new door closer adjusted to accessible
standards.
• As-Built Description:
• Proposed Solution:
• As-Built:
67
404.2.8 & 404.2.9ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
223
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Hallway1 Staff Only
Door
$12020 $2,400SF
3.3%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
49
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Door
$12015 $1,800SF
2.9%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
55
404.2.4.4ADA 2010
Southern entrance
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
224
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Door
$12020 $2,400SF
3.9%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
57
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Door Swing
$15,0001 $15,000JOB
Door width plus 10" to wall
ID24CPCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Provide door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
51
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Door Threshold
$7501 $750JOB
0.75" high
ID02PCODE
4.1.6(3)(d)(ii)ADAAG 91
Existing threshold at door is 1/2" high or less but
without a beveled edge on both sides.
Modify threshold to have beveled edge on each
side.
• As-Built Description:
• Proposed Solution:
• As-Built:
50
404.2.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
225
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Drinking Fountain
$6,0001 $6,000JOBIA01APCODE
4.1.3(10)(a)ADAAG 91
Where only one drinking fountain is provided per
floor: Fountain is not accessible to individuals who
use wheelchairs, or to those who have difficulty
bending or stooping.
Provide additional fountain or hi-lo combination
fountain.
• As-Built Description:
• Proposed Solution:
53
211.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Drinking Fountain
$1,5001 $1,500JOBIA05CPCODE
4.4.1ADAAG 91
Drinking fountain lacks protection for visually
impaired persons.
Provide cane-detectable rails.
• As-Built Description:
• Proposed Solution:
54
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Electrical
$9001 $900JOB
55" high
IC01PCODE
4.2.5 & 6ADAAG 91
Electric switch or control mounted less than 15"
measured to the bottom of the outlet box or greater
than 48 inches measured to the top of the outlet
box.
Relocate light switches or control to between 15"
and 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
52
308.2.1 & 308.2.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
226
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Protrusion Limits
$3001 $300JOB
Protrudes 6" at 54" high
EG04PCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
59
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Reach Range
$3001 $300JOB
58" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
56
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Reach Range
$3001 $300JOB
54"-57" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
58
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
227
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Wood Shop2 Staff Only
General Note
REFGN01PCODERefer to notes for observation and recommendation.
• As-Built Description:
• Proposed Solution:
60
No issues
• Notes:Mitigated:
YES
NO
Priority
4
0
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
228
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Plumbing Office3 Staff Only
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
61
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Sink
$5,2501 $5,250JOB
Knee space: 24" high
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
62
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
229
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Gym4 Staff Only
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
63
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Threshold
$7501 $750JOB
0.5" high
ID02PCODE
4.1.6(3)(d)(ii)ADAAG 91
Existing threshold at door is 1/2" high or less but
without a beveled edge on both sides.
Modify threshold to have beveled edge on each
side.
• As-Built Description:
• Proposed Solution:
• As-Built:
66
404.2.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
230
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Reach Range
$3002 $600JOB
50" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
64
308.2.1ADA 2010
Fist aid and towels
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
231
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Men's Bathroom5 Staff Only
Accessories
$3001 $300JOB
54" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
72
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Accessories
$4501 $450JOB
53" high
WG03PCODE
4.19.6ADAAG 91
Bottom of mirror located above lavatories or
countertops more than 40" above floor.
Relocate or provide new accessible mirror.
• As-Built Description:
• Proposed Solution:
• As-Built:
71
603.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
232
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Lavatory
$10,2001 $10,200JOB
Apron: 27.5" high
WD03PCODE
4.19.2ADAAG 91
Wheelchair clearance under lavatory apron or
lavatory counter front edge less than 29" high.
Provide new accessible lavatory. Remodel
restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
68
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Lavatory
$3601 $360JOBWD05PCODE
4.19.4ADAAG 91
Hot or sharp-surfaced water/drain pipe not insulated
or covered.
Insulate or cover water/drain pipe.
• As-Built Description:
• Proposed Solution:
69
606.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 3
Restroom
?1 $105,000JOBWA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
74
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
233
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Urinal
$7,2001 $7,200JOB
29" high
WE02PCODE
4.18.2ADAAG 91
Fixture mounted with rim more than 17" above
floor.
Provide accessible urinal. Remodel restroom as
needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
73
605.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
234
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Yard Maintenance Storage6 Staff Only
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
75
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Swing
$1501 $150JOB
Door width plus 13" to cabinet
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
76
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
235
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Mechanic Area7 Staff Only
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
77
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Lab
$5,4001 $5,400JOB
Eye wash: 42" high
LB01BPCODEMinimum of at least one of each type of sink and
other specialized equipment such as fume hoods,
microscopes, emergency eyewash and showers, etc,
associated with the special use activity is not
accessible. (CA Only)
Remodel existing cabinet/counter to make
specialized equipment accessible to disabled
persons.
• As-Built Description:
• Proposed Solution:
• As-Built:
83
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
236
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Protrusion Limits
$30010 $3,000LFEG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
78
307.2ADA 2010
Multiple protrusions through area
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 3
Public Counter
$6,0001 $6,000JOB
Top: 43" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
79
904.4ADA 2010
Lower if used by other staff to sign documents.
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
237
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Public Works Office8 Staff Only
Door Swing
$1501 $150JOB
Door width plus 3" to printer
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
80
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Non-Fixed Desk
$4,8002 $9,600JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
81
306.1ADA 2010
Table inaccessible due to base.
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 2
First Floor $190,185.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
238
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
Interior $190,185.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
239
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
7-1-1
City Yard - Maintenance Building 2 Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa FeAddress:Year Built:TBD
Floor:First Floor
City Yard - Maintenance Building 2 $190,185.00Facility:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
240
Power Plant Building
Corner of 50th and Seville
Access Compliance Survey Report
City of Vernon
October 2020
SSA Project #:19033.00
8Facility #:
241
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 8-0-1
Exterior- On-Site
Power Plant Building
E 50TH ST AND
SEVILLE AVE
VERNON, CA
90058
POWER PLANT
BUILDING
8-0-1
1
242
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 8-1-1
Interior- First Floor
Power Plant Building
E 50TH ST AND
SEVILLE AVE
VERNON, CA
90058
POWER PLANT
BUILDING
8-1-1 NO FLOOR PLANS PROVIDED 243
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-0-1
Power Plant Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:On-site
Exterior Path of Travel1 Staff Only
Accessible Route
$7525 $1,875SF
3.6%
EF07PCODE
4.3.7ADAAG 91
Cross slope more than 1":48" (2.083%).
Modify cross slope.
• As-Built Description:
• Proposed Solution:
• As-Built:
470
403.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Curb Ramp
$7,5001 $7,500JOBEH01PCODE
4.7.1ADAAG 91
No curb ramp available where an accessible route
crosses a curb.
Provide new curb ramp.
• As-Built Description:
• Proposed Solution:
479
303.4ADA 2010
No curb ramp access from parking
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
244
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-0-1
Power Plant Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:On-site
Door
$3001 $300JOBID06PCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Provide 10" min. "kick plate" covering width of
door when altering area.
• As-Built Description:
• Proposed Solution:
469
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Hardware
$7501 $750JOB
54" high
ID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
• As-Built:
471
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Swing
$1,5001 $1,500JOBID23PCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Change door swing.
• As-Built Description:
• Proposed Solution:
472
404.2.4ADA 2010
Pave Area and relocate box
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
245
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-0-1
Power Plant Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:On-site
Handrails
$28510 $2,850LF
Not on both sides of stairs.
ED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
• As-Built:
467
505.2ADA 2010
Employee Entrance
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 2
Height
$22512 $2,700LF
43" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
474
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Minimum Number
$9001 $900JOBEA01APCODE
4.1.2(5)ADAAG 91
At parking lot with 1-25 spaces, the number of
accessible spaces is less than required by code; 1
space required
Provide required accessible parking space with sign
including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
478
208.2ADA 2010
7 visitor spaces total, no accessible
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
246
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-0-1
Power Plant Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:On-site
Open Risers
$10812 $1,296LFEC03PCODE
4.9.2ADAAG 91
Stair does not have closed risers.
Modify stair to have closed risers
• As-Built Description:
• Proposed Solution:
473
504.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Ramps
$30030 $9,000SF
No ramp
EB01APCODE
4.1.1ADAAG 91
Ramp needed to provide disabled access at steps or
change of level along path of travel.
Provide new concrete ramp with handrails [slope
more than 1:20 (5.0%) needed].
• As-Built Description:
• Proposed Solution:
• As-Built:
476
303.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Reach Range
$3001 $300JOB
60" high and not located on accessible
level.
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
477
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
247
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-0-1
Power Plant Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:On-site
Reach Range
$3001 $300JOB
62" high call box
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
480
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Stairway
$4240 $1,680LFII02BPCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide 2" min., 4" max. wide contrasting color
strip 1" max. from nosing on top & bottom treads
when altering area.
• As-Built Description:
• Proposed Solution:
468
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Top & Bottom Extension at Stairs
REFED06REFPCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
475
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
248
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-0-1
Power Plant Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:On-site
On-site $30,951.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
249
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-0-1
Power Plant Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:On-site
Exterior $30,951.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
250
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-0
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:Basement
Training Room1 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
449
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Swing
$1501 $150JOBID24APCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
454
404.2.4ADA 2010
Closer and latch
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
251
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-0
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:Basement
Doormat
$1,5001 $1,500JOBID05PCODE
4.5.3ADAAG 91
Doormat hinders access to disabled persons.
Provide new doormat; recess or attach at edges.
• As-Built Description:
• Proposed Solution:
453
302.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Protrusion Limits
$3001 $300JOB
4.5"-6"
EG04PCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
451
307.2ADA 2010
Several protrusions
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 4
Public Counter
$6,0001 $6,000JOB
Top: 36" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
452
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
252
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-0
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:Basement
Typical Office2 Staff Only
Door
$7,5001 $7,500JOB
49" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
457
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Hardware
$7502 $1,500JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
455
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
253
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-0
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:Basement
Door Swing
$1504 $600JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
456
404.2.4ADA 2010
General offices
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
254
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-0
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:Basement
Common Space3 Staff Only
Lab
$5,4001 $5,400JOB
59" high to eyewash
LB01BPCODEMinimum of at least one of each type of sink and
other specialized equipment such as fume hoods,
microscopes, emergency eyewash and showers, etc,
associated with the special use activity is not
accessible. (CA Only)
Remodel existing cabinet/counter to make
specialized equipment accessible to disabled
persons.
• As-Built Description:
• Proposed Solution:
• As-Built:
460
Mitigated:
YES
NO
SeverityPriority
4 3
Protrusion Limits
$3001 $300JOBEG04PCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
459
307.2ADA 2010
Eye wash protrusion
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
255
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-0
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:Basement
Signage
$2701 $270JOBSA10APCODE
4.1.3(16)ADAAG 91
At final exit door to exterior: Where required exit
signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT" sign at door.
• As-Built Description:
• Proposed Solution:
458
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Basement $23,520.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
256
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Control Room1 Staff Only
Door
$3001 $300JOBID06PCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Provide 10" min. "kick plate" covering width of
door when altering area.
• As-Built Description:
• Proposed Solution:
415
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Clearance
$7,8001 $7,800JOB
31" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
423
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
257
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Door Hardware
$7502 $1,500JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
421
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Swing
$1501 $150JOB
46" from face of door
ID24APCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Remove or relocate furniture or storage items or
remove closer and latch.
• As-Built Description:
• Proposed Solution:
• As-Built:
417
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Door Swing
$15,0001 $15,000JOB
Closer and latch no push
ID24CPCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Provide door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
422
404.2.4ADA 2010
East side
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
258
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Public Counter
$6,0001 $6,000JOB
42" high
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
416
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Public Counter
$6,0001 $6,000JOB
36" high counter
IN03PCODE
7.2(2)ADAAG 91
Service counter (stand-up): Accessible section min.
36" length and 36" max. height (in CA: 28" to 34"
high) not provided.
Retrofit existing counter to provide accessible
section.
Interim solution: Provide auxiliary counter, table, or
clipboard.
• As-Built Description:
• Proposed Solution:
• As-Built:
420
904.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Reach Range
$3001 $300JOB
55" high first aid
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
418
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
259
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Reach Range
$3001 $300JOB
53" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
419
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Signage
$2701 $270JOBSA10BPCODE
4.1.3(16)ADAAG 91
At door leading into exit stairway: Where required
exit signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT STAIR
UP/DOWN" sign at door.
• As-Built Description:
• Proposed Solution:
391
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
260
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Restroom and Locker Room2 Staff Only
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
393
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Stopper
$751 $75JOBID06APCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Remove door stopper when altering area. Provide
rubber wedge.
• As-Built Description:
• Proposed Solution:
3
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
261
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Restroom
?1 $105,000JOB
No accessible stall provided.
WA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
• As-Built:
395
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Signage
$2701 $270JOBSA11APCODE
4.1.3(16)(a)ADAAG 91
Entrance to toilet or bathing facility not identified
with ADAAG compliant signage.
Provide ADA compliant sign mounted at 48" min.
above to baseline of the lowest Braille cells and 60"
max. to baseline of the highest line of raised
characters on nearest adjacent wall, on latch side of
a single door (located not to cause a Braille reader
to stand within the door swing).
• As-Built Description:
• Proposed Solution:
392
216.8; 703.6.1ADA 2010
No signage
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 3
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
2
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
262
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Urinal
$7,2001 $7,200JOB
25" high
WE02PCODE
4.18.2ADAAG 91
Fixture mounted with rim more than 17" above
floor.
Provide accessible urinal. Remodel restroom as
needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
394
605.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Urinal
$4,5001 $4,500JOB
25" wide urinal alcove
WE04PCODE
4.18.3ADAAG 91
30" x 48" clear floor space in front of accessible
urinal not provided.
Provide clear floor space in front of accessible
urinal. Remodel restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
4
605.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
263
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Locker Room3 Staff Only
Accessories
$3002 $600JOB
SD: 65" high
PTD: 65" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
402
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Accessories
$4501 $450JOB
65" high
WG03PCODE
4.19.6ADAAG 91
Bottom of mirror located above lavatories or
countertops more than 40" above floor.
Relocate or provide new accessible mirror.
• As-Built Description:
• Proposed Solution:
• As-Built:
401
603.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
264
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Corridor
$1501 $150JOB
25" wide at fixed bench
IH03APCODE
4.3.3ADAAG 91
Corridor, for occupant load less than 10, less than
36" wide.
Remove or relocate furniture and storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
398
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Hardware
$7501 $750JOBID07PCODE
4.13.9ADAAG 91
Door does not have accessible operating hardware.
Provide lever handle or other accessible hardware.
• As-Built Description:
• Proposed Solution:
404
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
397
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
265
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
5
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Swing
$1501 $150JOB
31" from face of door.
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
406
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Swing
$15,0001 $15,000JOB
Door width plus 7" to wall
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
396
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
266
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Door Swing
$15,0001 $15,000JOB
Door width plus 7" to wall
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
403
404.2.4ADA 2010
Door to hallway.
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 3
Lavatory
$10,2001 $10,200JOB
Knee space: 23" high
WD03PCODE
4.19.2ADAAG 91
Wheelchair clearance under lavatory apron or
lavatory counter front edge less than 29" high.
Provide new accessible lavatory. Remodel
restroom as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
400
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Locker Facilities
$2,2501 $2,250JOB
12" deep
GG03PCODE
4.35.4ADAAG 91
No section of bench provided adjacent to
designated accessible locker, measuring minimum
20-24” deep, 48” wide, and 17-19” high, and fixed
to a wall along the longer dimension.
Provide a new bench, fixed to a wall along the
longer dimension, close to the accessible locker.
• As-Built Description:
• Proposed Solution:
• As-Built:
399
803.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
267
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Restroom
$90,0001 $90,000JOBWA01PCODE
4.22ADAAG 91
Single accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide single-occupant accessible
restroom.
• As-Built Description:
• Proposed Solution:
407
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Shower
$12,0001 $12,000JOBWF01PCODE
4.21ADAAG 91
Shower not accessible; multiple compliance
violations.
Provide accessible shower.
• As-Built Description:
• Proposed Solution:
405
608.1ADA 2010
Shower room not accessible.
• Notes:Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
268
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Exterior Stairs Near Restroom4 Staff Only
Door
$7,5001 $7,500JOB
48" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
6
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Handrails
$28512 $3,420LFED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
410
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
269
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Open Risers
$10812 $1,296LFEC03PCODE
4.9.2ADAAG 91
Stair does not have closed risers.
Modify stair to have closed risers
• As-Built Description:
• Proposed Solution:
8
504.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Signage
$2701 $270JOBSA10BPCODE
4.1.3(16)ADAAG 91
At door leading into exit stairway: Where required
exit signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT STAIR
UP/DOWN" sign at door.
• As-Built Description:
• Proposed Solution:
408
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Tread Surface
$2712 $324LFEC02PCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
7
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
270
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Typical Office5 Staff Only
Door
$7,5005 $37,500JOB
52" high
ID06CPCODEVision Light at door that permits viewing, does not
have bottom of at least one glazed panel located 43
inches maximum above the finish floor. (Exception:
More than 66" above finished floor.)
Provide new door with vision panel at 43" max.
• As-Built Description:
• Proposed Solution:
• As-Built:
413
404.2.11ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Hardware
$7505 $3,750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
411
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
271
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Door Swing
$1501 $150JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
412
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
272
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Restroom6 Staff Only
Accessories
$3001 $300JOB
PTD: 61" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
433
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Accessories
$3001 $300JOB
SCD: 65" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
438
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
273
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Coat Hook
$1501 $150JOB
PTD: 51" high
WG03APCODE
4.2.5ADAAG 91
Accessible coat hook not within reach range.
Adjust existing or provide new coat hook at
maximum 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
432
603.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door
$9001 $900JOB
48" lock
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
428
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door
$9001 $900JOB
58" hook
ID17PCODE
4.13.9ADAAG 91
Door lock, handle or latch less than 34" or more
than 48" above the floor (CA only: 34" to 44").
Relocate or replace existing hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
429
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
274
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Door Clearance
$7,8001 $7,800JOB
27" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
426
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
425
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Swing
$7,8001 $7,800JOB
Door width plus 9" to wall, 13" deep
alcove
ID23BPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide relocated new door and frame; remodel
walls as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
427
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
275
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Grab Bars
$7801 $780JOB
Extends 51" from rear wall
SGB: 15" from wall
WB07APCODE
Fig. 29(b)ADAAG 91
Side grab bar less than 42" long, or located more
than 12 inches max. from the rear wall, or
extending less than 54" from rear wall (CA only:
front end min. 24" in front of water closet).
Provide or relocate accessible side grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
436
604.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Grab Bars
$1,0201 $1,020JOB
RGB: none
WB07BPCODE
4.17.6ADAAG 91
The rear wall grab is less than 36" min. or does not
extend from the centerline of the water closet 12"
min. on one side and 24" min. on the other side.
Provide or relocate accessible rear grab bar.
• As-Built Description:
• Proposed Solution:
• As-Built:
437
604.5.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
Lavatory
$2,7001 $2,700JOB
Top: 35" high
WD02APCODE
4.19.2ADAAG 91
Lavatory: Fixture rim or counter height more than
34" above floor.
Remount compliant fixture at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
430
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
276
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Lavatory
$10,2001 $10,200JOB
12" o.c.
WD01PCODE
4.19.3ADAAG 91
Clear floor space, 30" x 48" in front of fixture,
extending 19" max. under the lavatory, not
provided (CA only: Less than 18" from side wall to
centerline of lavatory).
Provide new accessible lavatory. Remodel restroom
as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
13
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Lavatory
$3601 $360JOBWD05PCODE
4.19.4ADAAG 91
Hot or sharp-surfaced water/drain pipe not insulated
or covered.
Insulate or cover water/drain pipe.
• As-Built Description:
• Proposed Solution:
431
606.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Protrusion Limits
$3004.5 $1,350LF
Protrudes 11" at 53" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
434
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
277
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
424
Mitigated:
YES
NO
SeverityPriority
4 3
Water Closet
$1,5001 $1,500JOBWB10PCODE
4.16.5ADAAG 91
Flush Control: Operating handle not mounted
toward wide side of stall.
Replace flush control with properly mounted
accessible type, or install sensor flush.
• As-Built Description:
• Proposed Solution:
435
604.6ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
278
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Break Room7 Staff Only
Cooktops
$1,9501 $1,950JOB
Reach over burner
KF15PCODE
13.3.4(6)ADAAG 91
Cooktop controls require reaching across the
burners.
Provide cooktop with accessible controls.
• As-Built Description:
• Proposed Solution:
• As-Built:
442
804.6.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Non-Fixed Desk
$4,8001 $4,800JOBIN02APCODE
4.32.3 & .4ADAAG 91
Accessible non-fixed table or desk (top 28" to 34"
high; knee space at least 27" high x 19" deep x 30"
wide) not provided.
Provide table or desk with accessible dimensions
when purchasing new furniture.
• As-Built Description:
• Proposed Solution:
444
306.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
279
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Reach Range
$3001 $300JOB
65" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
443
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Reach Range
$3004 $1,200JOB
>48" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
445
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Sink
$5,2501 $5,250JOB
Top: 36" high
IN06PCODE
4.24.2ADAAG 91
Sink rim higher than 34" above floor.
Remodel sink cabinet to lower sink.
• As-Built Description:
• Proposed Solution:
• As-Built:
441
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
280
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Sink
$5,2501 $5,250JOB
Knee space: none
IN06APCODE
4.24.3ADAAG 91
Sink does not have knee space min. 27" high x 19"
deep x 30" wide.
Remodel sink cabinet.
• As-Built Description:
• Proposed Solution:
• As-Built:
439
606.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
281
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Rear Office Entrance8 Staff Only
Door
$12020 $2,400SF
3.2% direction of travel
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
461
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Doormat
$1,5001 $1,500JOBID05PCODE
4.5.3ADAAG 91
Doormat hinders access to disabled persons.
Provide new doormat; recess or attach at edges.
• As-Built Description:
• Proposed Solution:
462
302.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
282
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Handrails
$28510 $2,850LF
Handrails non-compliant
ED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not compliant at stairs or ramp, required
on both sides (not required at curb ramps or
adjacent to seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
• As-Built:
448
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Signage
$2701 $270JOBSA10BPCODE
4.1.3(16)ADAAG 91
At door leading into exit stairway: Where required
exit signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT STAIR
UP/DOWN" sign at door.
• As-Built Description:
• Proposed Solution:
22
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Top & Bottom Extension at Stairs
REFED06REFPCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
447
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
283
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Pipe Room9 Staff Only
Handrail
$36040 $14,400LFED08APCODEGuards (42" high) not provided at side of ramp or
landing where drop-off to adjacent grade or floor
exceeds 30" height (California building code
requirement only).
Provide new guards, including handrail at ramp.
• As-Built Description:
• Proposed Solution:
14
Mitigated:
YES
NO
SeverityPriority
4 4
Handrail
REF
20" gaps
ED08CREFPCODEOpen guards does not have balusters or ornamental
patterns such that a 4-inch-diameter (102 mm)
sphere cannot pass through any opening.
Provide new guards which do not allow passage of
an 4 inch sphere at any opening.
• As-Built Description:
• Proposed Solution:
• As-Built:
15
405.9.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
284
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Height
$22520 $4,500LF
32" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
465
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Top & Bottom Extension at Stairs
$5101 $510JOBED06PCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
464
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Vertical Clearance
$1,5001 $1,500JOB
Under stair overhead clearance
EG01PCODE
4.4.2ADAAG 91
Overhead clearance less than 80" above finished
floor.
Modify overhead clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
463
307.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
285
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
First Floor $441,705.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
286
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Interior $465,225.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
287
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
8-1-1
Power Plant Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
Corner of 50th and SevilleAddress:Year Built:TBD
Floor:First Floor
Power Plant Building $496,176.00Facility:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
288
O.E. Clark Building
2716 Leonis Blvd
Access Compliance Survey Report
City of Vernon
October 2020
SSA Project #:19033.00
9Facility #:
289
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 9-0-1
Exterior- On-Site
O.E. Clark Building
2716 LEONIS
BLVD
VERNON, CA
90058
O.E. CLARK
BUILDING
9-0-1
2
1
290
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 9-1-1
Interior- First Floor
O.E. Clark Building
2716 LEONIS
BLVD
VERNON, CA
90058
O.E. CLARK
BUILDING
9-1-1 NO FLOOR PLANS PROVIDED 291
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-0-1
O.E. Clark Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:On-site
Secondary Employee Entrance1 Staff Only
Height
$22520 $4,500LF
32" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
305
505.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Tread Surface
$27100 $2,700LF
Employee entrance
EC02PCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
• As-Built:
304
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
292
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-0-1
O.E. Clark Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:On-site
Treads and Risers
$22570 $15,750LF
5"-6" high
EC07PCODEStair riser height less than 4" or more than 7".
Remodel stairs as needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
306
504.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
293
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-0-1
O.E. Clark Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:On-site
Parking2 Staff Only
Minimum Number
$9001 $900JOBEA01APCODE
4.1.2(5)ADAAG 91
At parking lot with 1-25 spaces, the number of
accessible spaces is less than required by code; 1
space required
Provide required accessible parking space with sign
including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
303
208.2ADA 2010
7 spaces total, no accessible
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 2
On-site $23,850.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
294
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-0-1
O.E. Clark Building Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:On-site
Exterior $23,850.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
295
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Main Employee Entrance1 Staff Only
Door
$3001 $300JOBID06PCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Provide 10" min. "kick plate" covering width of
door when altering area.
• As-Built Description:
• Proposed Solution:
300
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Doormat
$1,5001 $1,500JOBID05PCODE
4.5.3ADAAG 91
Doormat hinders access to disabled persons.
Provide new doormat; recess or attach at edges.
• As-Built Description:
• Proposed Solution:
302
302.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
296
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Ramps
$30030 $9,000SF
5" step up to office level
EB01APCODE
4.1.1ADAAG 91
Ramp needed to provide disabled access at steps or
change of level along path of travel.
Provide new concrete ramp with handrails [slope
more than 1:20 (5.0%) needed].
• As-Built Description:
• Proposed Solution:
• As-Built:
299
303.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Reach Range
$3001 $300JOB
57" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
301
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
297
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Interior Office Space2 Staff Only
Electrical
$9001 $900JOB
10" high
IC01PCODE
4.2.5 & 6ADAAG 91
Electric switch or control mounted less than 15"
measured to the bottom of the outlet box or greater
than 48 inches measured to the top of the outlet
box.
Relocate light switches or control to between 15"
and 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
308
308.2.1 & 308.2.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Handrails
$2854 $1,140LFED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
309
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
298
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Signage
$2701 $270JOBSA10APCODE
4.1.3(16)ADAAG 91
At final exit door to exterior: Where required exit
signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT" sign at door.
• As-Built Description:
• Proposed Solution:
307
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Stairway
$428 $336LFII02BPCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide 2" min., 4" max. wide contrasting color
strip 1" max. from nosing on top & bottom treads
when altering area.
• As-Built Description:
• Proposed Solution:
310
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
299
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Office/Break Room3 Staff Only
Corridor
$1501 $150JOB
25" wide
IH03APCODE
4.3.3ADAAG 91
Corridor, for occupant load less than 10, less than
36" wide.
Remove or relocate furniture and storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
312
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Swing
$1501 $150JOBID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
311
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
300
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Office4 Staff Only
Door Clearance
$7,8001 $7,800JOB
27" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
313
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
314
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
301
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Conference Room5 Staff Only
Assistive Listening
REFGI01EPCODE
4.1.3(19)(b) &
4.33.7
ADAAG 91
No portable assistive listening system provided for
small meeting room.
Share existing portable assistive listening system
from other facility.
• As-Built Description:
• Proposed Solution:
318
219.1 & 706.1
ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Assistive Listening
$3001 $300JOBGI02PCODE
4.1.3(19)(b)ADAAG 91
No signs at the building or assembly area entrance
to notify patrons that an assistive listening system is
available.
Provide assistive listening signage.
• As-Built Description:
• Proposed Solution:
319
703.7.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
302
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Door Clearance
$7,8001 $7,800JOB
27" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
315
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 2
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
316
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
Door Swing
$15,0001 $15,000JOB
41" from face of door
ID24CPCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Provide door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
317
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
303
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Protrusion Limits
$3005 $1,500LF
TV protrudes 4.5" at 56" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
320
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
2 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
304
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Men's Restroom6 Staff Only
Door Clearance
$7,8001 $7,800JOB
27" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
321
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Restroom
$90,0001 $90,000JOBWA01PCODE
4.22ADAAG 91
Single accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide single-occupant accessible
restroom.
• As-Built Description:
• Proposed Solution:
325
603.1ADA 2010
30" in front of toilet, 16" oc, no turning space, no
accessories
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
305
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Signage
$2701 $270JOBSA11APCODE
4.1.3(16)(a)ADAAG 91
Entrance to toilet or bathing facility not identified
with ADAAG compliant signage.
Provide ADA compliant sign mounted at 48" min.
above to baseline of the lowest Braille cells and 60"
max. to baseline of the highest line of raised
characters on nearest adjacent wall, on latch side of
a single door (located not to cause a Braille reader
to stand within the door swing).
• As-Built Description:
• Proposed Solution:
322
216.8; 703.6.1ADA 2010
Must be unisex
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 3
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
323
Must be unisex
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
306
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Women's Restroom7 Staff Only
Restroom
$90,0001 $90,000JOBWA01PCODE
4.22ADAAG 91
Single accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide single-occupant accessible
restroom.
• As-Built Description:
• Proposed Solution:
328
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
3 2
Signage
$2701 $270JOBSA11APCODE
4.1.3(16)(a)ADAAG 91
Entrance to toilet or bathing facility not identified
with ADAAG compliant signage.
Provide ADA compliant sign mounted at 48" min.
above to baseline of the lowest Braille cells and 60"
max. to baseline of the highest line of raised
characters on nearest adjacent wall, on latch side of
a single door (located not to cause a Braille reader
to stand within the door swing).
• As-Built Description:
• Proposed Solution:
326
216.8; 703.6.1ADA 2010
Must be unisex
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
307
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
327
Must be unisex
• Notes:
Mitigated:
YES
NO
SeverityPriority
3 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
308
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Stairs to Upper Warehouse8 Staff Only
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
334
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Door Stopper
$751 $75JOBID06APCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Remove door stopper when altering area. Provide
rubber wedge.
• As-Built Description:
• Proposed Solution:
335
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
309
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Handrails
$2856 $1,710LFED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
330
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Reach Range
$3001 $300JOB
55" high to doorbell
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
336
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Stairway
$428 $336LFII02BPCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide 2" min., 4" max. wide contrasting color
strip 1" max. from nosing on top & bottom treads
when altering area.
• As-Built Description:
• Proposed Solution:
333
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
310
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Top & Bottom Extension at Stairs
$5102 $1,020JOBED06PCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
332
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
311
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Warehouse Restroom9 Staff Only
Accessories
$3002 $600JOB
SD: 41" high
PTD: 53" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
340
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Accessories
$4501 $450JOB
48" high
WG03PCODE
4.19.6ADAAG 91
Bottom of mirror located above lavatories or
countertops more than 40" above floor.
Relocate or provide new accessible mirror.
• As-Built Description:
• Proposed Solution:
• As-Built:
341
603.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
312
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Coat Hook
$1501 $150JOB
65" high
WG03APCODE
4.2.5ADAAG 91
Accessible coat hook not within reach range.
Adjust existing or provide new coat hook at
maximum 48" height.
• As-Built Description:
• Proposed Solution:
• As-Built:
343
603.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Clearance
$7,8001 $7,800JOB
27" clear opening width
ID01PCODE
4.13.5ADAAG 91
Door on accessible route has less than 32" clear and
80" (78" min. to closer if provided) opening width
when 90° open.
Provide new, larger door and frame with new
accessible hardware.
• As-Built Description:
• Proposed Solution:
• As-Built:
337
404.2.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Door Hardware
$7501 $750JOBID07CPCODE
4.13.9ADAAG 91
Non-common use areas within this facility, such as
offices, do not have accessible door hardware.
Provide lever handle or other accessible hardware
when a specific need is identified in the future or
when altering area.
• As-Built Description:
• Proposed Solution:
338
404.2.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
313
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Fixed Bench
$1,5001 $1,500JOB
Bench and locker not accessible.
NO02PCODE
16.12.1ADAAG 91
Single fixed bench provided is not accessible.
Provide additional accessible bench or replace.
• As-Built Description:
• Proposed Solution:
• As-Built:
345
903.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Lavatory
$3601 $360JOBWD05PCODE
4.19.4ADAAG 91
Hot or sharp-surfaced water/drain pipe not insulated
or covered.
Insulate or cover water/drain pipe.
• As-Built Description:
• Proposed Solution:
339
606.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Restroom
?1 $105,000JOBWA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
344
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
314
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Shower
$12,0001 $12,000JOBWF01PCODE
4.21ADAAG 91
Shower not accessible; multiple compliance
violations.
Provide accessible shower.
• As-Built Description:
• Proposed Solution:
342
608.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Signage
$2701 $270JOBSA11APCODE
4.1.3(16)(a)ADAAG 91
Entrance to toilet or bathing facility not identified
with ADAAG compliant signage.
Provide ADA compliant sign mounted at 48" min.
above to baseline of the lowest Braille cells and 60"
max. to baseline of the highest line of raised
characters on nearest adjacent wall, on latch side of
a single door (located not to cause a Braille reader
to stand within the door swing).
• As-Built Description:
• Proposed Solution:
347
216.8; 703.6.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Signage
$2701 $270JOBSA15PCODERequired in CA only: identification symbol
centered 58" to 60" high on sanitary facility door
that contrasts with the door not provided (women:
12" ø circle, men: 12" triangle, unisex: combined
symbol).
Provide properly mounted sanitary facility symbol
when altering area. If wheelchair accessible,
include International Symbol of Accessibility on
sign.
• As-Built Description:
• Proposed Solution:
348
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
315
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Warehouse Restroom10 Staff Only
Accessories
$3002 $600JOB
PTD: 48"-57" high
WG01APCODE
4.23.7ADAAG 91
Dispensers in sanitary facilities, such as for towels,
soap, sanitary napkins, seat covers, etc., and waste
receptacles more than 48" (CA only: 40") from
floor to highest operating slot or control.
Relocate existing restroom accessories.
• As-Built Description:
• Proposed Solution:
• As-Built:
350
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Lavatory
$2,7001 $2,700JOB
Top: 36" high
WD02APCODE
4.19.2ADAAG 91
Lavatory: Fixture rim or counter height more than
34" above floor.
Remount compliant fixture at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
351
606.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
316
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Lavatory
$3601 $360JOBWD05PCODE
4.19.4ADAAG 91
Hot or sharp-surfaced water/drain pipe not insulated
or covered.
Insulate or cover water/drain pipe.
• As-Built Description:
• Proposed Solution:
352
606.5ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Restroom
?1 $105,000JOBWA01APCODE
4.22ADAAG 91
Multiple accommodation restroom not accessible;
multiple compliance violations.
Remodel area to provide accessible restroom with
one accessible stall, lavatory (and one urinal at
Mens).
• As-Built Description:
• Proposed Solution:
349
603.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 1
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
317
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Main Warehouse11 Staff Only
Handrail
$36010 $3,600LFED08APCODEGuards (42" high) not provided at side of ramp or
landing where drop-off to adjacent grade or floor
exceeds 30" height (California building code
requirement only).
Provide new guards, including handrail at ramp.
• As-Built Description:
• Proposed Solution:
360
Mitigated:
YES
NO
SeverityPriority
4 2
Handrails
$28510 $2,850LFED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
358
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
318
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Handrails
$28510 $2,850LFED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
363
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Handrails
$28510 $2,850LFED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
365
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 2
Minimum Number
$9001 $900JOB
Warehouse employee parking
EA01APCODE
4.1.2(5)ADAAG 91
At parking lot with 1-25 spaces, the number of
accessible spaces is less than required by code; 1
space required
Provide required accessible parking space with sign
including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
• As-Built:
355
208.2ADA 2010
No accessible spaces
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
319
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Protrusion Limits
$3001 $300JOB
General protrusions throughout
EG04PCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Remove/relocate protruding object. Patch existing
surface.
• As-Built Description:
• Proposed Solution:
• As-Built:
361
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Reach Range
$3001 $300JOB
56" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
354
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Signage
$2701 $270JOBSA10APCODE
4.1.3(16)ADAAG 91
At final exit door to exterior: Where required exit
signs are installed, signs to provide exiting
information for people with vision impairment are
not provided.
Provide raised letter/Braille "EXIT" sign at door.
• As-Built Description:
• Proposed Solution:
357
216.4.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
320
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Stairway
$4210 $420LFII02BPCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide 2" min., 4" max. wide contrasting color
strip 1" max. from nosing on top & bottom treads
when altering area.
• As-Built Description:
• Proposed Solution:
364
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 3
Tread Surface
$2712 $324LFEC02PCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
359
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
4 4
Walk
$75100 $7,500SF
11.9%
EF01PCODE
4.3.7ADAAG 91
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.
Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
353
403.3ADA 2010
Only route to upper ware house via vehicles
ramp.
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
321
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Walk
$7520 $1,500SF
6.6% direction of travel
EF01PCODE
4.3.7ADAAG 91
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.
Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
362
403.3ADA 2010
Path of travel to storage "office"
• Notes:
Mitigated:
YES
NO
SeverityPriority
4 4
First Floor $502,491.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
322
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
Interior $502,491.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
323
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
9-1-1
O.E. Clark Building Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
2716 Leonis BlvdAddress:Year Built:TBD
Floor:First Floor
O.E. Clark Building $526,341.00Facility:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
324
Apartment Complex
3380 E 50th St
Access Compliance Survey Report
City of Vernon
October 2020
SSA Project #:19033.00
10Facility #:
325
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number 10-0-1
Exterior- On-Site
Apartment Complex
3380 E 50TH ST
VERNON, CA
90058
APARTMENT
COMPLEX
10-0-1
5
6
3
1
2
4
7
326
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Guest Parking1 Staff Only
Floor or Ground Surfaces
$36150 $5,400SF
3.0%
EA05PCODE
4.6.3ADAAG 91
Accessible parking space has slope greater than
1/4":12" (2%).
Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
• As-Built:
7
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$6001 $600JOB
8'10" wide
EA02APCODE
4.6.3ADAAG 91
Accessible parking space smaller than 8' wide (CA
only: 9' x 18').
Modify parking space(s) to create accessible space.
• As-Built Description:
• Proposed Solution:
• As-Built:
3
502.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
327
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Parking
$3001 $300JOB
Faded
EA04DPCODEThe words "NO PARKING" not painted on the
ground within loading and unloading access aisle
(12" min high white letters), located so that it is
visible to traffic enforcement officials (required in
CA only).
Provide the words “NO PARKING” in each access
aisle, painted in 12” high letters, when altering area.
• As-Built Description:
• Proposed Solution:
• As-Built:
4
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$1351 $135JOB
48" high
EA04HPCODE
4.6.4ADAAG 91
Parking sign is not located between 60" and 80"
above the finish floor or ground surface measured
to the bottom of the sign.
Remount existing sign at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
6
502.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking Signage
$9751 $975JOB
Language incorrect
EA04CPCODENo "Tow Away" sign at parking lot entrance
(required in CA only).
Provide "Tow Away" sign at parking lot entrance
when altering area.
• As-Built Description:
• Proposed Solution:
• As-Built:
2
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
328
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Parking Signage
$3001 $300JOBEA04GPCODECA only: Additional Sign or additional language
below the symbol of accessibility stating
“Minimum Fine $250” not provided.
Provide compliant parking signage that includes
fine information.
• As-Built Description:
• Proposed Solution:
5
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
329
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Entrance2 Staff Only
Door
$3001 $300JOBID06PCODEAt push side of door on accessible route, bottom
10" does not have a smooth, uninterrupted surface.
Provide 10" min. "kick plate" covering width of
door when altering area.
• As-Built Description:
• Proposed Solution:
10
404.2.10ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Swing
$15,0001 $15,000JOB
Door width plus 16" to wall
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
9
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
330
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Private Accessible Parking3 Staff Only
Clear Width
$3001 $300JOB
30" wide between fence and parking
stall
EG03PCODE
4.2.1ADAAG 91
Obstacle reduces width of path of travel to less than
36"clearance.
Provide 36" width between obstacles. Relocate
obstacles; patch existing surface if needed.
• As-Built Description:
• Proposed Solution:
• As-Built:
14
403.5.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Floor or Ground Surfaces
$3650 $1,800SF
3.0%
EA05BPCODE
4.6.3ADAAG 91
Access aisle at accessible parking space has slope
greater than 1/4":12" (2%).
Modify slope at accessible parking space aisle.
• As-Built Description:
• Proposed Solution:
• As-Built:
13
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
331
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Parking
$1351 $135JOB
48" high
EA04HPCODE
4.6.4ADAAG 91
Parking sign is not located between 60" and 80"
above the finish floor or ground surface measured
to the bottom of the sign.
Remount existing sign at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
12
502.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking Signage
$3001 $300JOBEA04GPCODECA only: Additional Sign or additional language
below the symbol of accessibility stating
“Minimum Fine $250” not provided.
Provide compliant parking signage that includes
fine information.
• As-Built Description:
• Proposed Solution:
11
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
332
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Path of Travel Near Laundry Room4 Staff Only
Walk
$7535 $2,625SF
7.4%
EF01PCODE
4.3.7ADAAG 91
Walk: Slope greater than 1:20 (5.0%), and walk
does not comply with requirements for ramps.
Modify walk/sidewalk slope to 1:20 or less.
• As-Built Description:
• Proposed Solution:
• As-Built:
15
403.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
333
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Courtyard and 50th Gate5 Staff Only
Changes in Level
$631 $63SF
1" high
EF03PCODE
4.3.8ADAAG 91
Walk: Pavement dislocation creates abrupt change
in level exceeding 1/2" in accessible route.
Remove, replace or repair area of pavement
sufficient to correct abrupt change in level.
• As-Built Description:
• Proposed Solution:
• As-Built:
17
403.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Door
$12025 $3,000SF
3.7%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
18
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
334
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Door
$12012 $1,440SF
4.2%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
20
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Door Swing
$1501 $150JOB
24" from face of door to mail box
ID23APCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Remove or relocate furniture or storage items.
• As-Built Description:
• Proposed Solution:
• As-Built:
23
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Door Swing
$7,8001 $7,800JOB
Unpaved
ID24BPCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Pave 12" strike landing at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
19
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
335
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Protrusion Limits
$3003 $900LF
Mail box protrudes 12" at 30" high
EG04APCODE
4.4.1ADAAG 91
Protruding objects more than 4" from wall, when
bottom of object more than 27" or less than 80"
above finished floor.
Provide cane-detectable railing to mark area of low
clearance.
• As-Built Description:
• Proposed Solution:
• As-Built:
22
307.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 1
Reach Range
$3001 $300JOB
52" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
16
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Reach Range
$3001 $300JOB
57" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
21
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
336
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Reach Range
$3001 $300JOB
56" high
IE01PCODE
4.2.5ADAAG 91
Reach height to control or access point, exceeds 48"
or is less than 15".
Modify equipment or mounting.
• As-Built Description:
• Proposed Solution:
• As-Built:
29
308.2.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
337
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Typical Stairs6 Staff Only
Handrails
$28512 $3,420LF
One side only
ED01PCODE
4.8.5 & 4.9.4ADAAG 91
Handrail not provided at stairs or ramp, required on
both sides (not required at curb ramps or adjacent to
seating areas).
Provide new handrail for each side including
extensions.
• As-Built Description:
• Proposed Solution:
• As-Built:
27
505.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Open Risers
$108400 $43,200LFEC03PCODE
4.9.2ADAAG 91
Stair does not have closed risers.
Modify stair to have closed risers
• As-Built Description:
• Proposed Solution:
24
504.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
338
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Top & Bottom Extension at Stairs
$5108 $4,080JOBED06PCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
26
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Tread Surface
$27300 $8,100LFEC02PCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
25
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
339
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Trash Enclosure7 Staff Only
Door Swing
$7,8001 $7,800JOBID24BPCODE
Fig. 25(a)ADAAG 91
Front approach: At push side, door does not have
clear and level maneuvering space measuring door
width x 48" (door width plus 12" if door has both,
latch and closer).
Provide relocated new door and frame; remodel
walls as needed.
• As-Built Description:
• Proposed Solution:
30
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Turning Space
$1,5001 $1,500JOB
58" wide, no turn space
IH05PCODEThe area does not provide a minimum 60" diameter
turning space within to allow maneuvering through
the space.
Modify area to provide sufficient maneuvering
space.
• As-Built Description:
• Proposed Solution:
• As-Built:
31
304.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
On-site $110,523.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
340
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Exterior $110,523.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
341
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
10-0-1
Apartment Complex Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
3380 E 50th StAddress:Year Built:TBD
Floor:On-site
Apartment Complex $110,523.00Facility:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
342
City Parking Structure
4305 S Santa Fe Ave
Access Compliance Survey Report
City of Vernon
October 2020
SSA Project #:19033.00
11Facility #:
343
Location:
Facility:
BARRIER
LOCATION
MAP
1
Prepared By:
Project #:
Date:
Sheet:
REF NORTH
N.T.S.
19033
10-21-2020
Sally Swanson
Architects
San Francisco, CA
Item Number
CITY HALL
PARKING
STRUCTURE
4305 S. SANTA FE
AVE
VERNON, CA
90058
Exterior- On-site
City Hall Parking Structure11-0-1
66
4
5
2
3
6
344
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Accessible Parking2 Staff Only
Floor or Ground Surfaces
$36100 $3,600SF
3.1%
EA05PCODE
4.6.3ADAAG 91
Accessible parking space has slope greater than
1/4":12" (2%).
Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
• As-Built:
482
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Floor or Ground Surfaces
$36100 $3,600SF
3.2%
EA05BPCODE
4.6.3ADAAG 91
Access aisle at accessible parking space has slope
greater than 1/4":12" (2%).
Modify slope at accessible parking space aisle.
• As-Built Description:
• Proposed Solution:
• As-Built:
483
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
345
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking
$6001 $600JOB
8' wide
EA02APCODE
4.6.3ADAAG 91
Accessible parking space smaller than 8' wide (CA
only: 9' x 18').
Modify parking space(s) to create accessible space.
• As-Built Description:
• Proposed Solution:
• As-Built:
484
502.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$6001 $600JOB
17' long
EA02APCODE
4.6.3ADAAG 91
Accessible parking space smaller than 8' wide (CA
only: 9' x 18').
Modify parking space(s) to create accessible space.
• As-Built Description:
• Proposed Solution:
• As-Built:
485
502.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the
ground within loading and unloading access aisle
(12" min high white letters), located so that it is
visible to traffic enforcement officials (required in
CA only).
Provide the words “NO PARKING” in each access
aisle, painted in 12” high letters, when altering area.
• As-Built Description:
• Proposed Solution:
486
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
346
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking
$1351 $135JOB
13" high
EA04HPCODE
4.6.4ADAAG 91
Parking sign is not located between 60" and 80"
above the finish floor or ground surface measured
to the bottom of the sign.
Remount existing sign at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
487
502.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking Signage
$3001 $300JOBEA04GPCODECA only: Additional Sign or additional language
below the symbol of accessibility stating
“Minimum Fine $250” not provided.
Provide compliant parking signage that includes
fine information.
• As-Built Description:
• Proposed Solution:
488
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
347
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Accessible Parking3 Staff Only
Floor or Ground Surfaces
$36200 $7,200SF
2.7%- 3.2%
EA05PCODE
4.6.3ADAAG 91
Accessible parking space has slope greater than
1/4":12" (2%).
Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
• As-Built:
489
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Floor or Ground Surfaces
$36200 $7,200SF
3.2%
EA05PCODE
4.6.3ADAAG 91
Accessible parking space has slope greater than
1/4":12" (2%).
Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
• As-Built:
491
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
348
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Floor or Ground Surfaces
$36250 $9,000SF
3.0%
EA05BPCODE
4.6.3ADAAG 91
Access aisle at accessible parking space has slope
greater than 1/4":12" (2%).
Modify slope at accessible parking space aisle.
• As-Built Description:
• Proposed Solution:
• As-Built:
490
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
General Note
REF
Remove Van sign
GN01PCODERefer to notes for observation and recommendation.
• As-Built Description:
• Proposed Solution:
• As-Built:
496
Mitigated:
YES
NO
Priority
1
0
Parking
$6002 $1,200JOB
17'6" long
EA02APCODE
4.6.3ADAAG 91
Accessible parking space smaller than 8' wide (CA
only: 9' x 18').
Modify parking space(s) to create accessible space.
• As-Built Description:
• Proposed Solution:
• As-Built:
493
502.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
349
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking
$6001 $600JOB
4'8" wide
EA02BPCODE
4.6.3ADAAG 91
Accessible parking space does not have 5' wide
access aisle; 8' wide for van accessible aisle.
Modify parking aisle(s) to create accessible space
by restriping.
• As-Built Description:
• Proposed Solution:
• As-Built:
492
502.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$2,1901 $2,190JOBEA03PCODE
Fig.9ADAAG 91
Disabled persons must wheel or walk behind
parked car(s) other than their own.
Relocate parking and provide curb ramp to
accessible route.
• As-Built Description:
• Proposed Solution:
498
502.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Parking
$3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the
ground within loading and unloading access aisle
(12" min high white letters), located so that it is
visible to traffic enforcement officials (required in
CA only).
Provide the words “NO PARKING” in each access
aisle, painted in 12” high letters, when altering area.
• As-Built Description:
• Proposed Solution:
497
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
350
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking
$1351 $135JOB
14" high
EA04HPCODE
4.6.4ADAAG 91
Parking sign is not located between 60" and 80"
above the finish floor or ground surface measured
to the bottom of the sign.
Remount existing sign at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
495
502.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking Signage
$3002 $600JOBEA04GPCODECA only: Additional Sign or additional language
below the symbol of accessibility stating
“Minimum Fine $250” not provided.
Provide compliant parking signage that includes
fine information.
• As-Built Description:
• Proposed Solution:
494
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
351
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Accessible Parking4 Staff Only
Floor or Ground Surfaces
$36300 $10,800SF
5.7%
EA05PCODE
4.6.3ADAAG 91
Accessible parking space has slope greater than
1/4":12" (2%).
Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
• As-Built:
499
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
Floor or Ground Surfaces
$36200 $7,200SF
3.2%
EA05BPCODE
4.6.3ADAAG 91
Access aisle at accessible parking space has slope
greater than 1/4":12" (2%).
Modify slope at accessible parking space aisle.
• As-Built Description:
• Proposed Solution:
• As-Built:
500
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
352
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking
$6001 $600JOB
7' wide
EA02BPCODE
4.6.3ADAAG 91
Accessible parking space does not have 5' wide
access aisle; 8' wide for van accessible aisle.
Modify parking aisle(s) to create accessible space
by restriping.
• As-Built Description:
• Proposed Solution:
• As-Built:
501
502.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$1351 $135JOB
15" high
EA04HPCODE
4.6.4ADAAG 91
Parking sign is not located between 60" and 80"
above the finish floor or ground surface measured
to the bottom of the sign.
Remount existing sign at accessible height.
• As-Built Description:
• Proposed Solution:
• As-Built:
502
502.7ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
353
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Accessible Parking5 Staff Only
Floor or Ground Surfaces
$36100 $3,600SF
2.7% - 3.0%
EA05PCODE
4.6.3ADAAG 91
Accessible parking space has slope greater than
1/4":12" (2%).
Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
• As-Built:
503
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Floor or Ground Surfaces
$36250 $9,000SF
3.0%
EA05BPCODE
4.6.3ADAAG 91
Access aisle at accessible parking space has slope
greater than 1/4":12" (2%).
Modify slope at accessible parking space aisle.
• As-Built Description:
• Proposed Solution:
• As-Built:
504
502.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
354
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking
$6001 $600JOB
17' long
EA02APCODE
4.6.3ADAAG 91
Accessible parking space smaller than 8' wide (CA
only: 9' x 18').
Modify parking space(s) to create accessible space.
• As-Built Description:
• Proposed Solution:
• As-Built:
505
502.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the
ground within loading and unloading access aisle
(12" min high white letters), located so that it is
visible to traffic enforcement officials (required in
CA only).
Provide the words “NO PARKING” in each access
aisle, painted in 12” high letters, when altering area.
• As-Built Description:
• Proposed Solution:
507
Mitigated:
YES
NO
SeverityPriority
1 4
Parking Signage
$3001 $300JOBEA04GPCODECA only: Additional Sign or additional language
below the symbol of accessibility stating
“Minimum Fine $250” not provided.
Provide compliant parking signage that includes
fine information.
• As-Built Description:
• Proposed Solution:
506
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
355
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
EV Charging6 Staff Only
General Note
REFGN01PCODERefer to notes for observation and recommendation.
• As-Built Description:
• Proposed Solution:
508
6 total, no accessible EV Charging
• Notes:Mitigated:
YES
NO
Priority
1
0
Handrail
$36030 $10,800LF
41.5" high guardrail
ED08APCODEGuards (42" high) not provided at side of ramp or
landing where drop-off to adjacent grade or floor
exceeds 30" height (California building code
requirement only).
Provide new guards, including handrail at ramp.
• As-Built Description:
• Proposed Solution:
• As-Built:
511
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
356
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Height
$225120 $27,000LF
31.5" - 32" high
ED02PCODE
4.9.4(5)ADAAG 91
Handrail gripping surface top not mounted between
34" and 38" above ramp surface or stair nosings.
Remove existing and provide new handrail.
• As-Built Description:
• Proposed Solution:
• As-Built:
512
505.4ADA 2010
3 Total Stairs
• Notes:
Mitigated:
YES
NO
SeverityPriority
1 3
Top & Bottom Extension at Stairs
$5108 $4,080JOBED06PCODE
4.9.4(2)ADAAG 91
Stair handrail does not extend horizontally 12"
minimum beyond top nosing, and one tread width
sloped, plus 12" minimum horizontally beyond the
bottom nosing.
Extend stair handrail at top and bottom (cost for
each extension piece).
• As-Built Description:
• Proposed Solution:
510
505.10.2; 505.10.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Tread Surface
$27220 $5,940LFEC02PCODEThe leading 2" of the tread does not have visual
contrast of dark–on–light or light–on–dark from the
remainder of the tread.
Provide contrasting color strips at all exterior stair
treads.
• As-Built Description:
• Proposed Solution:
509
504.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
357
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
On-site $117,915.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
358
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-0-1
City Parking Structure Part:Exterior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Exterior $117,915.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
359
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:Ground Floor
Lower Parking1 Staff Only
Minimum Number
$9001 $900JOB
106 total spaces, no accessible
EA01DPCODE
4.1.2(5)*ADAAG 91
At parking lot with 76-100 spaces, the number of
accessible spaces is less than required by code; 4
spaces required.
Provide required accessible parking spaces with
signs including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
• As-Built:
513
208.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
360
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
EntryXx Staff Only
Door
$12025 $3,000SF
7.5%
ID11PCODE
4.13.6ADAAG 91
Surface of required maneuvering clearance at door
slopes more than 1/4":12" (2.0%).
Modify surface slope at door.
• As-Built Description:
• Proposed Solution:
• As-Built:
92
404.2.4.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Door Swing
$15,0001 $15,000JOB
53" from face of door
ID23CPCODE
Fig. 25(a)ADAAG 91
Front approach: At pull side, door does not have
clear and level maneuvering space measuring door
width plus 18" x 60". (24" x 60" at exterior doors).
Provide power door operator.
• As-Built Description:
• Proposed Solution:
• As-Built:
94
404.2.4ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
361
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Floor or Ground Surfaces
$36100 $3,600SFEA05PCODE
4.6.3ADAAG 91
Accessible parking space has slope greater than
1/4":12" (2%).
Modify slope at accessible parking space.
• As-Built Description:
• Proposed Solution:
90
502.4ADA 2010
Curb ramp within access aisle.
• Notes:Mitigated:
YES
NO
SeverityPriority
1 2
Minimum Number
$9001 $900JOB
4 EV charging stations, No Accessible
EA01APCODE
4.1.2(5)ADAAG 91
At parking lot with 1-25 spaces, the number of
accessible spaces is less than required by code; 1
space required
Provide required accessible parking space with sign
including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
• As-Built:
91
208.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 2
Minimum Number
REFEA01BREFPCODE
4.1.2(5)*ADAAG 91
At parking lot with 26-50 spaces, the number of
accessible spaces is less than required by code; 2
spaces required.
Provide required accessible parking spaces with
signs including a minimum of one van space.
• As-Built Description:
• Proposed Solution:
85
208.2ADA 2010
39 spaces, 2 accessible
• Notes:
Mitigated:
YES
NO
Priority
1
0
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
362
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking
$6001 $600JOB
8' wide
EA02APCODE
4.6.3ADAAG 91
Accessible parking space smaller than 8' wide (CA
only: 9' x 18').
Modify parking space(s) to create accessible space.
• As-Built Description:
• Proposed Solution:
• As-Built:
87
502.2ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$6001 $600JOB
7'4" wide
EA02BPCODE
4.6.3ADAAG 91
Accessible parking space does not have 5' wide
access aisle; 8' wide for van accessible aisle.
Modify parking aisle(s) to create accessible space
by restriping.
• As-Built Description:
• Proposed Solution:
• As-Built:
88
502.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Parking
$3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the
ground within loading and unloading access aisle
(12" min high white letters), located so that it is
visible to traffic enforcement officials (required in
CA only).
Provide the words “NO PARKING” in each access
aisle, painted in 12” high letters, when altering area.
• As-Built Description:
• Proposed Solution:
89
Mitigated:
YES
NO
SeverityPriority
1 4
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
363
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Parking Signage
$3002 $600JOBEA04GPCODECA only: Additional Sign or additional language
below the symbol of accessibility stating
“Minimum Fine $250” not provided.
Provide compliant parking signage that includes
fine information.
• As-Built Description:
• Proposed Solution:
86
Mitigated:
YES
NO
SeverityPriority
1 4
Ramp
$22530 $6,750LF
6.2%
EB03PCODE
4.8.1ADAAG 91
Slope not steep but greater than 1:20 (5.0 %)
without handrails.
Provide handrails for ramp.
• As-Built Description:
• Proposed Solution:
• As-Built:
95
405.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
Ramp
$13510 $1,350SF
4.2%
EB07APCODETop landing less than 60" long. (CA only: 60" x
60").
Modify ramp top landing to 60" in length and 60"
wide.
• As-Built Description:
• Proposed Solution:
• As-Built:
97
405.7.3ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 3
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
364
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Slope
$30012 $3,600SF
2.7%
EB05APCODE
4.8.4ADAAG 91
Level 2% max. landing for ramp not provided.
Rebuild ramp to provide landings for each ramp run
with slopes no greater than 2%
• As-Built Description:
• Proposed Solution:
• As-Built:
96
405.7.1ADA 2010
Mitigated:
YES
NO
SeverityPriority
1 4
On-site $37,200.00Floor:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
365
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
Interior $37,200.00Area:Conceptual Costs for
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
366
Qty TotalUnit CostCodes / Mitigation Info
Access Compliance Survey Report
Facility:
11-1-1
City Parking Structure Part:Interior
City of Vernon
Item no., Rm no.
and Name
Existing Architectural Barrier
and Proposed Solution
4305 S Santa Fe AveAddress:Year Built:TBD
Floor:On-site
City Parking Structure $155,115.00Facility:Conceptual Costs for
$3,383,616.00Conceptual Costs for City of Vernon
October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #
367
City of Vernon- Sidewalks
October 2020
SSA Project # 19033
Access Compliance Survey Report
Appendix B: Sidewalks
City of Vernon
368
SSA Project # 19033
City of Vernon - Sidewalks - ACS Report
October 2020
TABLE OF CONTENTS
I. Access Compliance Survey Report
i. Report Navigation and Legend, Abbreviations
ii. Master Street List
iii. Cost Summary
II. Survey Data for Sidewalks
i. Survey Data
369
SSA Project # 19033
City of Vernon - Sidewalks - ACS Report
October 2020
NAVIGATION & LEGEND
370
1. Street Side: Corresponds to the side of the street surveyed: - N, S, E and W.
2. Dist. from Corner: The location of the identified barrier, measured in feet from the intersection/starting street.
3. Survey Street: Name of arterial/primary Street for which barriers are being surveyed.
4. Barrier Type: Type of Barrier recorded.
5. Starting Street: Name of the intersecting starting street from which barrier locations are being measured.
6. Measurement: Existing condition/dimension.
7. Sidewalk Width: Width of the sidewalk measured in feet.
8. Qty: Number of solutions required. 9. End Street: Name of the intersecting ending street from which barrier locations are being measured.
10. Unit: Unit of measurement used to compute estimate. LF=linear feet; SF=square feet; JOB=lump sum; REF=reference
11. Cost Estimated cost of specific solution per one unit (The final cost of barrier removal may exceed this estimate based on the year of mitigation, design approach, and chosen method of mitigation.12. Total: Total estimated cost for removing identified barrier (multiplied Qty by Cost).
13. Priority: Priority number assigned to specific barrier based on priorization criteria which include: expected frequency of use and severity of the barrier. Measureed on a scale of 0 to 200, with 200 being the highest priority and 0 being the least.
SSA Project # 19033
City of Vernon - Sidewalks - ACS Report
October 2020
43 521 126711
NAVIGATION
8 9 10 13
371
SSA Project # 19033
City of Vernon - Sidewalks - ACS Report
October 2020
ADA Americans with Disabilities Act
ADAAG ADA Accessibility Guidelines
E East
Fig. Figure
JOB per one job (lump sum)
lbs. Pounds
LF Linear foot
MUTCD Manual on Uniform Traffic Control Devices
N North
NE Northeast
NW Northwest
POT Path of travel
PROW Public Right-of-Way
PROWAG Public Right-of-Way Accesible Guidelines
Qty Quantity
REF Reference; Provided in locations with
overlapping issue; indicates no addition cost
required for mitigation
S South
SE Southeast
SF Square foot
SW Southwest
TBD To be determined
W West
LEGEND ABBREVIATIONS
372
SSA Project # 19033
City of Vernon - Sidewalks - ACS Report
October 2020
MASTER STREET LIST
373
Access Compliance Survey Report - SidewalksCity of Vernon Master Street List
Total Cost for Street:
ALCOA AVE $7,134,075.38Street:
AYERS AVE $1,980,089.25Street:
BANDINI BLVD $11,059,109.25Street:
BICKETT ST $677,168.50Street:
CHAMBERS ST $222,112.50Street:
CHARTER ST $882,693.00Street:
CORONA AVE $1,057,397.25Street:
DISTRICT BLVD $6,630,610.50Street:
E 25TH ST $2,796,331.00Street:
E 26TH ST $6,697,996.00Street:
E 27TH ST $2,675,616.50Street:
E 28TH ST $1,571,602.75Street:
E 30TH ST $146,825.25Street:
E 37TH ST $5,042,928.75Street:
E 38TH ST $3,329,577.50Street:
E 44TH ST $3,249,993.00Street:
E 45TH ST $1,758,858.75Street:
E 46TH ST $3,765,860.00Street:
E 48TH ST $2,910,073.25Street:
E 49TH ST $5,810,840.13Street:
E 50TH ST $5,241,455.63Street:
E 51ST ST $1,115,504.00Street:
E 52ND DR $759,786.00Street:
E 52ND PL $309,400.00Street:
E 52ND ST $2,877,855.75Street:
E 53RD ST $119,956.50Street:
E 54TH ST $1,344,381.25Street:
E 55TH ST $2,133,931.25Street:
E 56TH ST $74,166.50Street:
E 57TH ST $2,383,138.75Street:
E ANDERSON ST $598,021.00Street:
E SLAUSON AVE $3,058,467.00Street:
E VERNON AVE $8,728,279.50Street:
E WASHINGTON BLVD $2,996,297.63Street:
EVERETT AVE $981,801.00Street:
EVERETT CT $598,101.00Street:
EXCHANGE AVE $1,277,289.88Street:
FRUITLAND AVE $10,686,738.63Street:
FWY 710 RAMP $54,960.00Street:
GIFFORD AVE $457,820.25Street:
HAMPTON ST $1,061,405.00Street:
HARRIET ST $330,011.25Street:
HAWTHORNE AVE $706,958.25Street:
HELIOTROPE AVE $521,496.00Street:
IRVING ST $350,375.25Street:
LEONIS BLVD $5,621,552.63Street:
LOMA VISTA AVE $1,789,049.75Street:
MALABAR ST $164,317.00Street:
MALBURG WY $1,150,021.00Street:
MINERVA ST $224,544.00Street:
PACIFIC BLVD $3,475,434.51Street:
PACKERS AVE $47,610.00Street:
PENNINGTON WY $1,104,717.50Street:
ROSS ST $1,901,406.25Street:
S 1ST ST $637,188.75Street:
S 2ND ST $767,715.50Street:
S ALAMEDA ST $5,982,593.63Street:
S ATLANTIC BLVD $1,885,699.50Street:
S BONNIE BEACH PL $484,186.50Street:
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
374
Access Compliance Survey Report - SidewalksCity of Vernon Master Street List
Total Cost for Street:
S BOYLE AVE $5,427,737.25Street:
S DOWNEY RD $3,777,524.00Street:
S INDIANA ST $776,846.25Street:
S MAYWOOD AVE $1,130,957.50Street:
S SANTA FE AVE $7,780,965.00Street:
S SOTO ST $8,478,721.75Street:
S SUNOL DR $527,738.50Street:
SACO ST $614,102.25Street:
SAINT CHARLES ST $470,863.75Street:
SEVILLE AVE $2,144,382.75Street:
SIERRA PINE AVE $755,289.00Street:
STATE ST $786,144.00Street:
Total Cost for City Sidewalks:$176,074,664.30
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
375
SSA Project # 19033
City of Vernon - Sidewalks - ACS Report
October 2020
COST SUMMARY
376
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
Total Cost for Street:ALCOA AVE $7,134,075.38
Survey Street OrientationStart Street End Street Cost
FRUITLAND AVE5232 ALCOA AVEALCOA AVE $132,151.50E
TRAIN CROSSING5563 ALCOA AVEALCOA AVE $211,598.25W
MALBURG WY6118 ALCOA AVE (OPP SIDE
OF ST)
ALCOA AVE $472,230.00W
E SLAUSON AVE6140 ALCOA AVEALCOA AVE $830,610.13E
6140 ALCOA AVE6199 MALBURG WYALCOA AVE $325,356.00S / E
E 46TH STE 44TH STALCOA AVE $540,532.50W
TRAIN CROSSINGE 46TH STALCOA AVE $365,131.00W
FRUITLAND AVEE 50TH STALCOA AVE $309,264.00W
ALCOA AVEE SLAUSON AVEALCOA AVE $994,236.50W
TRAIN CROSSINGE VERNON AVEALCOA AVE $121,320.00W
5563 ALCOA AVEFRUITLAND AVEALCOA AVE $917,194.00W
TRAIN CROSSINGLEONIS BLVDALCOA AVE $299,354.25W
E 44TH STTRAIN CROSSINGALCOA AVE $1,581,082.50W
E 50TH STTRAIN CROSSING (4927
ALCOA AVE)
ALCOA AVE $34,014.75W
Total Cost for Street:AYERS AVE $1,980,089.25
Survey Street OrientationStart Street End Street Cost
S SUNOL DR4395 AYERS AVEAYERS AVE $178,266.25N / E
BANDINI BLVD4398 AYERS AVEAYERS AVE $380,600.25S
4395 AYERS AVEBANDINI BLVDAYERS AVE $690,588.25W /
NTRAIN CROSSINGE 26TH STAYERS AVE $143,532.00NE
4398 AYERS AVES SUNOL DRAYERS AVE $238,204.00S
E 26TH STTRAIN CROSSINGAYERS AVE $348,898.50SW
Total Cost for Street:BANDINI BLVD $11,059,109.25
Survey Street OrientationStart Street End Street Cost
S SOTO ST2939 BANDINI BLVDBANDINI BLVD $453,390.00N
CITY BOUNDARY3308 BANDINI BLVDBANDINI BLVD $160,458.75S
S INDIANA ST3768 BANDINI BLVDBANDINI BLVD $1,204,704.50S
FWY 710 RAMPAYERS AVEBANDINI BLVD $745,136.50S
S DOWNEY RDBANDINI BLVDBANDINI BLVD $348,659.50N
S SUNOL DRBONNIE BEACH PLBANDINI BLVD $611,220.50S
PENNINGTON WYCITY BOUNDARYBANDINI BLVD $627,699.00N
SIERRA PINE AVEEAST SIDE OF LA RIVERBANDINI BLVD $387,772.50S
S ATLANTIC BLVDFWY 710 RAMPBANDINI BLVD $303,411.00S
5276 BANDINI BLVDPENNINGTON WYBANDINI BLVD $683,125.50S
PENNINGTON WYS ATLANTIC BLVDBANDINI BLVD $881,820.50S
TRAIN CROSSINGS INDIANA STBANDINI BLVD $973,170.50S
EAST SIDE OF LA RIVERS SOTO STBANDINI BLVD $521,550.00S
AYERS AVES SUNOL DRBANDINI BLVD $845,709.00S
3768 BANDINI BLVDSIDEWALK BEGINSBANDINI BLVD $708,728.50S
3308 BANDINI BLVDSIERRA PINE AVEBANDINI BLVD $464,671.50S
BONNIE BEACH PLTRAIN CROSSINGBANDINI BLVD $1,117,247.50S
TRAIN CROSSINGTRAIN CROSSING BEFORE S
DOWNEY RD
BANDINI BLVD $20,634.00N
Total Cost for Street:BICKETT ST $677,168.50
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGCITY BOUNDARYBICKETT ST $208,012.50E
TRAIN CROSSINGE 54TH STBICKETT ST $118,920.00W
5715 BICKETT STTRAIN CROSSINGBICKETT ST $350,236.00W
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
377
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
Total Cost for Street:CHAMBERS ST $222,112.50
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSHAMPTON STCHAMBERS ST $81,420.00S
HAMPTON STPACIFIC BLVDCHAMBERS ST $140,692.50N
Total Cost for Street:CHARTER ST $882,693.00
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSING4200 CHARTER STCHARTER ST $250,101.00S
S DOWNEY RD4295 CHARTER STCHARTER ST $321,745.50NE
SIDEWALK ENDSDRIVEWAYCHARTER ST $47,817.00E
ROAD BLOCKEDEXCHANGE AVECHARTER ST $59,521.50E
ROAD BLOCKEDS DOWNEY RDCHARTER ST $19,615.50S
S DOWNEY RDS MAYWOOD AVECHARTER ST $64,138.50N
EXCHANGE AVETRAIN CROSSINGCHARTER ST $119,754.00W
Total Cost for Street:CORONA AVE $1,057,397.25
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGDISTRICT BLVDCORONA AVE $70,312.50W
E 49TH STE 48TH STCORONA AVE $209,070.00W
E 50TH STE 49TH STCORONA AVE $204,697.50W
TRAIN CROSSINGE 50TH STCORONA AVE $212,242.50W
TRAIN CROSSINGFRUITLAND AVECORONA AVE $76,410.00E
E 48TH STTRAIN CROSSINGCORONA AVE $284,664.75W
Total Cost for Street:DISTRICT BLVD $6,630,610.50
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGCORONA AVEDISTRICT BLVD $837,284.50S /
SWTRAIN CROSSINGE 49TH STDISTRICT BLVD $109,736.25SW
TRAIN CROSSINGE 50TH STDISTRICT BLVD $104,832.00SW
LOMA VISTA AVEEVERETT AVEDISTRICT BLVD $724,576.75S
S ATLANTIC BLVDFRUITLAND AVEDISTRICT BLVD $118,957.50SW
TRAIN CROSSINGGIFFORD AVEDISTRICT BLVD $83,918.25SW
SIDEWALK ENDSHELIOTROPE AVEDISTRICT BLVD $22,884.00S
CORONA AVELOMA VISTA AVEDISTRICT BLVD $922,494.00S
SIDEWALK ENDSS ATLANTIC BLVDDISTRICT BLVD $683,723.00S
SIDEWALK CONSTRUCTIONS DOWNEY RDDISTRICT BLVD $108,314.25S
EVERETT AVES MAYWOOD AVEDISTRICT BLVD $584,107.50S
HELIOTROPE AVESIDEWALK BEGINSDISTRICT BLVD $608,043.00S
FRUITLAND AVETRAIN CROSSINGDISTRICT BLVD $579,170.25SW
CORONA AVETRAIN CROSSING (4735
DISTRICT BLVD)
DISTRICT BLVD $320,226.00NE /
NTRAIN CROSSINGTRAIN CROSSING (4825
DISTRICT BLVD)
DISTRICT BLVD $247,779.00NE
TRAIN CROSSING (4825 DISTRICT
BLVD)
TRAIN CROSSING (4949
DISTRICT BLVD)
DISTRICT BLVD $443,612.00NE
TRAIN CROSSINGTRAIN CROSSING (AFTER
DISTRICT BLVD)
DISTRICT BLVD $130,952.25SW
Total Cost for Street:E 25TH ST $2,796,331.00
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVE2120 E 25TH STE 25TH ST $499,070.00S
TRAIN CROSSINGS ALAMEDA STE 25TH ST $284,800.50S
TRAIN CROSSINGS SANTA FE AVEE 25TH ST $908,884.00N
2120 E 25TH STTRAIN CROSSINGE 25TH ST $1,103,576.50S
Total Cost for Street:E 26TH ST $6,697,996.00
Survey Street OrientationStart Street End Street Cost
S SOTO ST2640 E 26TH STE 26TH ST $172,395.00S
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
378
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
HARRIET ST2677 E 26TH STE 26TH ST $267,090.00N
S INDIANA ST3770 E 26TH STE 26TH ST $490,702.50S
AYERS AVE4366 E 26TH STE 26TH ST $335,886.75S
SIDEWALK ENDSAYERS AVEE 26TH ST $420,015.00S
S BONNIE BEACH PLE 26TH STE 26TH ST $389,160.00S
2640 E 26TH STHARRIET STE 26TH ST $404,767.00S
TRAIN CROSSINGMINERVA STE 26TH ST $259,772.25N
4366 E 26TH STS BONNIE BEACH PLE 26TH ST $377,730.00S
SIDEWALK ENDSS DOWNEY RDE 26TH ST $205,440.00SW
E 26TH STS INDIANA STE 26TH ST $343,477.50S
TRAIN CROSSINGS SANTA FE AVEE 26TH ST $80,259.00S
TRAIN CROSSINGS SOTO STE 26TH ST $513,781.75S
3770 E 26TH STSIDEWALK BEGINSE 26TH ST $767,277.50S
TRAIN CROSSINGSIERRA PINE AVEE 26TH ST $126,390.00S
SIERRA PINE AVETRAIN CROSSINGE 26TH ST $717,744.00S
TRAIN CROSSINGTRAIN CROSSING (3211 E
26TH ST)
E 26TH ST $486,780.00S
TRAIN CROSSING (3211 E 26TH
ST)
TRAIN CROSSING (3305 E
26TH ST)
E 26TH ST $297,291.00NE
S DOWNEY RDTRAIN CROSSING BEFORE S
DOWNEY RD
E 26TH ST $42,036.75SW
Total Cost for Street:E 27TH ST $2,675,616.50
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVE2200 E 27TH STE 27TH ST $581,436.50S
SIDEWALK ENDS2375 E 27TH STE 27TH ST $533,200.00N
S SANTA FE AVE2443 E 27TH STE 27TH ST $122,284.00N
TRAIN CROSSINGS SANTA FE AVEE 27TH ST $518,725.50S
2455 E 27TH STTRAIN CROSSINGE 27TH ST $919,970.50N
Total Cost for Street:E 28TH ST $1,571,602.75
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSS SANTA FE AVEE 28TH ST $694,379.00S
S SANTA FE AVESIDEWALK BEGINSE 28TH ST $877,223.75N
Total Cost for Street:E 30TH ST $146,825.25
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSS SANTA FE AVEE 30TH ST $146,825.25S
Total Cost for Street:E 37TH ST $5,042,928.75
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVE2350 E 37TH STE 37TH ST $85,995.00S
JEWEL AVE2522 E 37TH STE 37TH ST $1,052,761.00S
2350 E 37TH STIRVING STE 37TH ST $290,403.75S
2522 E 37TH STJEWEL AVEE 37TH ST $579,797.00N
S ALAMEDA STROSS STE 37TH ST $852,264.00N
E 38TH STS SANTA FE AVEE 37TH ST $760,253.25S
JEWEL AVES SOTO STE 37TH ST $450,060.00N
ROSS STSACO STE 37TH ST $554,492.25N
S SOTO STSEVILLE AVEE 37TH ST $416,902.50S
Total Cost for Street:E 38TH ST $3,329,577.50
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVEE 37TH STE 38TH ST $198,562.50N
SIDEWALK ENDSIRVING STE 38TH ST $762,223.50S
IRVING STROSS STE 38TH ST $1,132,344.50S
ROSS STS ALAMEDA STE 38TH ST $328,348.50S
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
379
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
2522 E 37TH STS SANTA FE AVEE 38TH ST $753,892.50S
S SANTA FE AVESIDEWALK BEGINSE 38TH ST $154,206.00S
Total Cost for Street:E 44TH ST $3,249,993.00
Survey Street OrientationStart Street End Street Cost
S BOYLE AVE4404 S STATE STE 44TH ST $33,231.00S
S BOYLE AVEALCOA AVEE 44TH ST $816,654.75N
ALCOA AVES BOYLE AVEE 44TH ST $1,020,726.25S
TRAIN CROSSINGS SOTO STE 44TH ST $437,987.25S
3060 E 44TH STTRAIN CROSSINGE 44TH ST $941,393.75S
Total Cost for Street:E 45TH ST $1,758,858.75
Survey Street OrientationStart Street End Street Cost
SEVILLE AVEPACIFIC BLVDE 45TH ST $616,500.00S
SIDEWALK ENDSS DOWNEY RDE 45TH ST $70,020.00N
HAWTHORNE AVESAINT CHARLES STE 45TH ST $353,163.75N
SIDEWALK ENDSSEVILLE AVEE 45TH ST $574,702.50S
S DOWNEY RDSIDEWALK BEGINSE 45TH ST $144,472.50S
Total Cost for Street:E 46TH ST $3,765,860.00
Survey Street OrientationStart Street End Street Cost
S SOTO ST2957 E 46TH STE 46TH ST $298,957.50N
ALCOA AVE3018 E 46TH STE 46TH ST $132,214.25S
S BOYLE AVEALCOA AVEE 46TH ST $608,175.00N
2650 E 46TH STPACIFIC BLVDE 46TH ST $146,850.00S
ALCOA AVES BOYLE AVEE 46TH ST $368,769.50S
SIDEWALK ENDSS SOTO STE 46TH ST $225,926.50S
SAINT CHARLES STSAINT CHARLES STE 46TH ST $493,686.50W
PACIFIC BLVDSEVILLE AVEE 46TH ST $200,800.00N
3018 E 46TH STSIDEWALK BEGINSE 46TH ST $1,290,480.75S
Total Cost for Street:E 48TH ST $2,910,073.25
Survey Street OrientationStart Street End Street Cost
S ALAMEDA ST2025 E 48TH STE 48TH ST $224,850.75N
S SANTA FE AVE2034 E 48TH STE 48TH ST $438,624.00S
SIDEWALK ENDSCORONA AVEE 48TH ST $574,354.50S
SIDEWALK ENDSDISTRICT BLVDE 48TH ST $195,382.50N
2025 E 48TH STEND OF SIDEWALK AT
DRIVEWAY
E 48TH ST $178,884.00N
DISTRICT BLVDGIFFORD AVEE 48TH ST $16,051.50S
CORONA AVELOMA VISTA AVEE 48TH ST $506,156.00S
2034 E 48TH STS ALAMEDA STE 48TH ST $520,008.00S
SIDEWALK ENDSS SANTA FE AVEE 48TH ST $182,340.00N
GIFFORD AVESIDEWALK BEGINSE 48TH ST $73,422.00S
Total Cost for Street:E 49TH ST $5,810,840.13
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVE2100 E 49TH STE 49TH ST $471,436.00S
S ALAMEDA ST2145 E 49TH STE 49TH ST $561,944.75N
GIFFORD AVECORONA AVEE 49TH ST $925,832.00S
GIFFORD AVEDISTRICT BLVDE 49TH ST $149,413.50N
EVERETT AVEDRIVEWAYE 49TH ST $14,272.50N
TRAIN CROSSINGEVERETT AVEE 49TH ST $115,276.50S
TRAIN CROSSINGEVERETT CTE 49TH ST $58,305.00S
SIDEWALK ENDSGIFFORD AVEE 49TH ST $300,939.00S
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
380
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
PACIFIC BLVDHAMPTON STE 49TH ST $472,601.00S
CORONA AVELOMA VISTA AVEE 49TH ST $894,316.13S
HAMPTON STPACIFIC BLVDE 49TH ST $264,041.25N
2100 E 49TH STS ALAMEDA STE 49TH ST $327,427.00S
HAMPTON STS SANTA FE AVEE 49TH ST $872,811.25S
DISTRICT BLVDSIDEWALK BEGINSE 49TH ST $100,439.50S
LOMA VISTA AVETRAIN CROSSINGE 49TH ST $281,784.75S
Total Cost for Street:E 50TH ST $5,241,455.63
Survey Street OrientationStart Street End Street Cost
S SOTO ST2905 E 50TH STE 50TH ST $182,133.00N
S BOYLE AVE3022 E 50TH STE 50TH ST $150,176.25S
ALCOA AVE3228 E 50TH STE 50TH ST $89,223.75S
S SOTO ST5001 S SOTO STE 50TH ST $20,760.00S
S BOYLE AVEALCOA AVEE 50TH ST $440,333.25S
GIFFORD AVECORONA AVEE 50TH ST $952,002.50S
GIFFORD AVEDISTRICT BLVDE 50TH ST $571,845.00N
DISTRICT BLVDGIFFORD AVEE 50TH ST $1,043,001.00S
CORONA AVELOMA VISTA AVEE 50TH ST $591,520.00S
3228 E 50TH STS BOYLE AVEE 50TH ST $780,496.50S
S BOYLE AVES SOTO STE 50TH ST $120,360.00S
3022 E 50TH STSIDEWALK BEGINSE 50TH ST $299,604.38S
Total Cost for Street:E 51ST ST $1,115,504.00
Survey Street OrientationStart Street End Street Cost
S ALAMEDA ST2131 E 51ST STE 51ST ST $316,575.00N
2380 E 51ST ST2140 E 51ST STE 51ST ST $220,410.00S
S SANTA FE AVE2380 E 51ST STE 51ST ST $15,282.00S
2140 E 51ST STS ALAMEDA STE 51ST ST $293,822.00S
2131 E 51ST STS SANTA FE AVEE 51ST ST $269,415.00N
Total Cost for Street:E 52ND DR $759,786.00
Survey Street OrientationStart Street End Street Cost
4905 E 52ND DRALAMO AVEE 52ND DR $73,530.00N
KING AVEHELIOTROPE AVEE 52ND DR $470,256.00N
S ATLANTIC BLVDKING AVEE 52ND DR $216,000.00N
Total Cost for Street:E 52ND PL $309,400.00
Survey Street OrientationStart Street End Street Cost
HELIOTROPE AVE4905 E 52ND PLE 52ND PL $309,400.00NE
Total Cost for Street:E 52ND ST $2,877,855.75
Survey Street OrientationStart Street End Street Cost
S ALAMEDA ST2139 E 52ND STE 52ND ST $414,153.00N
S SANTA FE AVE2200 E 52ND STE 52ND ST $723,301.50S
S SANTA FE AVEMALABAR STE 52ND ST $464,979.00N
MALABAR STPACIFIC BLVDE 52ND ST $475,857.00N
2200 E 52ND STS ALAMEDA STE 52ND ST $405,868.50S
ALLEY - ADJACENT SANTA FE
BLVD
S SANTA FE AVEE 52ND ST $393,696.75S
Total Cost for Street:E 53RD ST $119,956.50
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVECITY BOUNDARYE 53RD ST $52,668.00N
CITY BOUNDARYS SANTA FE AVEE 53RD ST $67,288.50S
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
381
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
Total Cost for Street:E 54TH ST $1,344,381.25
Survey Street OrientationStart Street End Street Cost
S SOTO ST2825 E 54TH STE 54TH ST $159,170.00N
S BOYLE AVEBICKETT STE 54TH ST $324,892.25S
S SANTA FE AVECITY BOUNDARYE 54TH ST $62,928.00N
E 54TH STS BOYLE AVEE 54TH ST $353,005.00N
CITY BOUNDARYS SANTA FE AVEE 54TH ST $44,511.00S
BICKETT STS SOTO STE 54TH ST $399,875.00S
Total Cost for Street:E 55TH ST $2,133,931.25
Survey Street OrientationStart Street End Street Cost
S ALAMEDA ST2051 E 55TH STE 55TH ST $345,581.50N
S SANTA FE AVE2100 E 55TH STE 55TH ST $399,675.25S
2100 E 55TH STS ALAMEDA STE 55TH ST $759,780.00S
ALLEY - ADJACENT SANTA FE
BLVD
S SANTA FE AVEE 55TH ST $628,894.50S
Total Cost for Street:E 56TH ST $74,166.50
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVECITY BOUNDARYE 56TH ST $30,580.50N
CITY BOUNDARYS SANTA FE AVEE 56TH ST $43,586.00S
Total Cost for Street:E 57TH ST $2,383,138.75
Survey Street OrientationStart Street End Street Cost
S 2ND ST5700 S 1ST STE 57TH ST $78,166.50S
S SANTA FE AVECITY BOUNDARYE 57TH ST $42,664.50N
S SANTA FE AVEE ANDERSON STE 57TH ST $656,370.00S
ASPHALT DRIVEWAYS 1ST STE 57TH ST $218,139.00S
E ANDERSON STS 2ND STE 57TH ST $689,187.75S
S 1ST STS ALAMEDA STE 57TH ST $164,350.00S
CITY BOUNDARYS SANTA FE AVEE 57TH ST $534,261.00S
Total Cost for Street:E ANDERSON ST $598,021.00
Survey Street OrientationStart Street End Street Cost
E 57TH ST2202 E ANDERSON STE ANDERSON ST $177,661.00E
S 2ND STE 57TH STE ANDERSON ST $349,308.00W /
N2198 E ANDERSON STS 2ND STE ANDERSON ST $71,052.00S
Total Cost for Street:E SLAUSON AVE $3,058,467.00
Survey Street OrientationStart Street End Street Cost
MALBURG WYALCOA AVEE SLAUSON AVE $974,234.50S
ALCOA AVEMALBURG WYE SLAUSON AVE $730,322.00N
TRAIN CROSSINGS BOYLE AVEE SLAUSON AVE $517,076.25S
SIDEWALK ENDSS SANTA FE AVEE SLAUSON AVE $222,271.50S
MALBURG WYTRAIN CROSSINGE SLAUSON AVE $614,562.75S
Total Cost for Street:E VERNON AVE $8,728,279.50
Survey Street OrientationStart Street End Street Cost
S SANTA FE AVE2503 E VERNON AVEE VERNON AVE $317,820.00N
SEVILLE AVE2620 E VERNON AVEE VERNON AVE $268,620.00S
S SOTO ST3163 E VERNON AVEE VERNON AVE $289,897.50N
S BOYLE AVE3275 E VERNON AVEE VERNON AVE $411,901.50S
S DOWNEY RDALCOA AVEE VERNON AVE $1,223,185.25S
S ALAMEDA STFURLONG PLE VERNON AVE $854,244.00N
SAINT CHARLES STHAWTHORNE AVEE VERNON AVE $166,099.50S
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
382
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
HAWTHORNE AVES ALAMEDA STE VERNON AVE $425,714.00S
ALCOA AVES BOYLE AVEE VERNON AVE $893,360.25S
ALCOA AVES DOWNEY RDE VERNON AVE $550,344.50N
2620 E VERNON AVES SANTA FE AVEE VERNON AVE $843,814.00S
3275 E VERNON AVES SOTO STE VERNON AVE $490,701.50S
S SANTA FE AVESAINT CHARLES STE VERNON AVE $750,165.00S
S SOTO STSEVILLE AVEE VERNON AVE $1,242,412.50S
Total Cost for Street:E WASHINGTON BLVD $2,996,297.63
Survey Street OrientationStart Street End Street Cost
3888 E WASHINGTON BLVD3770 E WASHINGTON BLVDE WASHINGTON BLVD $679,008.00S
SHEILA ST3888 E WASHINGTON BLVDE WASHINGTON BLVD $272,376.00S
S DOWNEY RDCITY BOUNDARYE WASHINGTON BLVD $346,777.50SW
CITY BOUNDARYS DOWNEY RDE WASHINGTON BLVD $201,376.13NE
3770 E WASHINGTON BLVDSIDEWALK BEGINSE WASHINGTON BLVD $1,496,760.00S
Total Cost for Street:EVERETT AVE $981,801.00
Survey Street OrientationStart Street End Street Cost
E 49TH ST4803 EVERETT AVEEVERETT AVE $38,299.50W
TRAIN CROSSINGDISTRICT BLVDEVERETT AVE $311,962.50W
FRUITLAND AVEE 49TH STEVERETT AVE $252,001.50W
DISTRICT BLVDEXCHANGE AVEEVERETT AVE $209,137.50W
E 49TH STSIDEWALK BEGINSEVERETT AVE $170,400.00W
Total Cost for Street:EVERETT CT $598,101.00
Survey Street OrientationStart Street End Street Cost
FRUITLAND AVEE 49TH STEVERETT CT $322,431.00W
E 49TH STFRUITLAND AVEEVERETT CT $275,670.00E
Total Cost for Street:EXCHANGE AVE $1,277,289.88
Survey Street OrientationStart Street End Street Cost
CHARTER ST4353 EXCHANGE AVEEXCHANGE AVE $96,517.50N
S DOWNEY RDCHARTER STEXCHANGE AVE $295,996.50N
4353 EXCHANGE AVELOMA VISTA AVEEXCHANGE AVE $163,393.38N
S MAYWOOD AVES DOWNEY RDEXCHANGE AVE $599,744.50S
SIDEWALK ENDSS MAYWOOD AVEEXCHANGE AVE $121,638.00S
Total Cost for Street:FRUITLAND AVE $10,686,738.63
Survey Street OrientationStart Street End Street Cost
S SOTO ST2901 FRUITLAND AVEFRUITLAND AVE $469,614.00N
S BOYLE AVE2929 FRUITLAND AVEFRUITLAND AVE $651,870.00S
GIFFORD AVE4901 FRUITLAND AVEFRUITLAND AVE $213,290.50N
S DOWNEY RDALCOA AVEFRUITLAND AVE $1,405,673.25S
CORONA AVECARMELITA AVEFRUITLAND AVE $49,096.00S
LOMA VISTA AVECORONA AVEFRUITLAND AVE $367,942.50N
4901 FRUITLAND AVEDISTRICT BLVDFRUITLAND AVE $227,672.50N
S MAYWOOD AVEEVERETT AVEFRUITLAND AVE $197,190.00N
LOMA VISTA AVEEVERETT CTFRUITLAND AVE $200,547.00S
CORONA AVEGIFFORD AVEFRUITLAND AVE $251,397.00N
S SANTA FE AVEHAMPTON STFRUITLAND AVE $619,347.63N
CARMELITA AVELOMA VISTA AVEFRUITLAND AVE $267,363.00S
PACIFIC BLVDMALABAR STFRUITLAND AVE $484,394.75S
EVERETT CTMAYWOOD AVEFRUITLAND AVE $200,839.50S
S SOTO STPACIFIC BLVDFRUITLAND AVE $1,007,261.75S
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
383
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
ALCOA AVES BOYLE AVEFRUITLAND AVE $1,359,393.25S
MAYWOOD AVES DOWNEY RDFRUITLAND AVE $785,898.00S
S DOWNEY RDS MAYWOOD AVEFRUITLAND AVE $169,736.50N
MALABAR STS SANTA FE AVEFRUITLAND AVE $351,500.00S
2929 FRUITLAND AVES SOTO STFRUITLAND AVE $1,103,231.50S
PACIFIC BLVDSEVILLE AVEFRUITLAND AVE $303,480.00N
Total Cost for Street:FWY 710 RAMP $54,960.00
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSSIDEWALK BEGINSFWY 710 RAMP $54,960.00W
Total Cost for Street:GIFFORD AVE $457,820.25
Survey Street OrientationStart Street End Street Cost
E 49TH STDRIVEWAYGIFFORD AVE $50,940.00E
TRAIN CROSSINGE 48TH STGIFFORD AVE $24,462.00W
TRAIN CROSSINGE 49TH STGIFFORD AVE $69,680.25W
TRAIN CROSSINGE 50TH STGIFFORD AVE $96,690.00W
TRAIN CROSSINGFRUITLAND AVEGIFFORD AVE $84,735.00E
E 48TH STSIDEWALK BEGINSGIFFORD AVE $17,779.50E
E 49TH STTRAIN CROSSINGGIFFORD AVE $113,533.50W
Total Cost for Street:HAMPTON ST $1,061,405.00
Survey Street OrientationStart Street End Street Cost
E 49TH ST5034 HAMPTON STHAMPTON ST $188,275.00E
E 49TH STCHAMBERS STHAMPTON ST $232,780.00W
FRUITLAND AVEE 49TH STHAMPTON ST $640,350.00W
Total Cost for Street:HARRIET ST $330,011.25
Survey Street OrientationStart Street End Street Cost
E 26TH STE 25TH STHARRIET ST $178,368.00W
E 25TH STE 26TH STHARRIET ST $151,643.25E
Total Cost for Street:HAWTHORNE AVE $706,958.25
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSE 45TH STHAWTHORNE AVE $38,321.25E
E 45TH STE VERNON AVEHAWTHORNE AVE $632,187.00S
E VERNON AVESIDEWALK BEGINSHAWTHORNE AVE $36,450.00E
Total Cost for Street:HELIOTROPE AVE $521,496.00
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSING52ND PLHELIOTROPE AVE $319,440.00E
RAILROAD CROSSINGDISTRICT BLVDHELIOTROPE AVE $106,464.00W
E 52ND DRRAILROAD TRACKSHELIOTROPE AVE $69,120.00W
DISTRICT BLVDTRAIN CROSSINGHELIOTROPE AVE $26,472.00SE
Total Cost for Street:IRVING ST $350,375.25
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGE 37TH STIRVING ST $49,599.00W
E 38TH STE 38TH STIRVING ST $223,785.75S
E 38TH STTRAIN CROSSINGIRVING ST $76,990.50W
Total Cost for Street:LEONIS BLVD $5,621,552.63
Survey Street OrientationStart Street End Street Cost
S BOYLE AVE2906 LEONIS BLVDLEONIS BLVD $336,950.00S
S SOTO ST2909 LEONIS BLVDLEONIS BLVD $512,394.00N
S DOWNEY RDALCOA AVELEONIS BLVD $1,349,646.13S
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
384
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
SEVILLE AVEPACIFIC BLVDLEONIS BLVD $275,448.00S
ALCOA AVES BOYLE AVELEONIS BLVD $1,092,397.50S
ALCOA AVES DOWNEY RDLEONIS BLVD $684,060.00N
2906 LEONIS BLVDS SOTO STLEONIS BLVD $726,202.75S
S SOTO STSEVILLE AVELEONIS BLVD $644,454.25S
Total Cost for Street:LOMA VISTA AVE $1,789,049.75
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGDISTRICT BLVDLOMA VISTA AVE $408,373.25W
DISTRICT BLVDE 48TH STLOMA VISTA AVE $96,840.00E
FRUITLAND AVEE 49TH STLOMA VISTA AVE $451,715.00W
E 49TH STE 50TH STLOMA VISTA AVE $125,334.00E
DISTRICT BLVDEXCHANGE AVELOMA VISTA AVE $375,250.00W
E 50TH STFRUITLAND AVELOMA VISTA AVE $111,862.50E
E 49TH STTRAIN CROSSINGLOMA VISTA AVE $219,675.00W
Total Cost for Street:MALABAR ST $164,317.00
Survey Street OrientationStart Street End Street Cost
FRUITLAND AVEE 52ND STMALABAR ST $79,365.00E
E 52ND STFRUITLAND AVEMALABAR ST $84,952.00W
Total Cost for Street:MALBURG WY $1,150,021.00
Survey Street OrientationStart Street End Street Cost
6199 MALBURG WY6065 MALBURG WYMALBURG WY $196,008.00W
E SLAUSON AVE6074 MALBURG WYMALBURG WY $304,513.00E
6074 MALBURG WYALCOA AVEMALBURG WY $250,776.00E
6065 MALBURG WYE SLAUSON AVEMALBURG WY $398,724.00W
Total Cost for Street:MINERVA ST $224,544.00
Survey Street OrientationStart Street End Street Cost
E 26TH STE 25TH STMINERVA ST $76,209.00W
E 25TH STE 26TH STMINERVA ST $148,335.00E
Total Cost for Street:PACIFIC BLVD $3,475,434.51
Survey Street OrientationStart Street End Street Cost
E 49TH STCHAMBERS STPACIFIC BLVD $364,144.75W
FRUITLAND AVECITY BOUNDARYPACIFIC BLVD $55,278.00E
CHAMBERS STE 45TH STPACIFIC BLVD $853,738.01W
E 45TH STE 46TH STPACIFIC BLVD $256,077.00E
FRUITLAND AVEE 49TH STPACIFIC BLVD $403,059.50W
E 52ND STFRUITLAND AVEPACIFIC BLVD $798,876.25W
E 46TH STLEONIS BLVDPACIFIC BLVD $175,861.00E
E 45TH STS SANTA FE AVEPACIFIC BLVD $568,400.00S
Total Cost for Street:PACKERS AVE $47,610.00
Survey Street OrientationStart Street End Street Cost
S DOWNEY RDSIDEWALK BEGINSPACKERS AVE $47,610.00S
Total Cost for Street:PENNINGTON WY $1,104,717.50
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSBANDINI BLVDPENNINGTON WY $373,302.50NE
BANDINI BLVDSIDEWALK BEGINSPENNINGTON WY $731,415.00S /
W
Total Cost for Street:ROSS ST $1,901,406.25
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGE 37TH STROSS ST $419,332.00W
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
385
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
SIDEWALK ENDSE 38TH STROSS ST $438,399.00W
E 37TH STS ALAMEDA STROSS ST $581,273.25S /
WE 38TH STSIDEWALK BEGINSROSS ST $318,285.00E
E 38TH STTRAIN CROSSINGROSS ST $144,117.00W
Total Cost for Street:S 1ST ST $637,188.75
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSE 57TH STS 1ST ST $294,648.00W
E 57TH STSIDEWALK BEGINSS 1ST ST $342,540.75E
Total Cost for Street:S 2ND ST $767,715.50
Survey Street OrientationStart Street End Street Cost
E SLAUSON AVEE 57TH STS 2ND ST $413,811.50W
E 57TH STE ANDERSON STS 2ND ST $233,064.00E
E ANDERSON STE SLAUSON AVES 2ND ST $120,840.00E
Total Cost for Street:S ALAMEDA ST $5,982,593.63
Survey Street OrientationStart Street End Street Cost
E 25TH STE 27TH STS ALAMEDA ST $369,944.50E
ROSS STE 37TH STS ALAMEDA ST $691,560.25S
E 37TH STE 38TH STS ALAMEDA ST $100,439.63E
E VERNON AVEE 48TH STS ALAMEDA ST $882,765.00E
E 48TH STE 49TH STS ALAMEDA ST $535,080.75E
E 49TH STE 51ST STS ALAMEDA ST $427,110.00E
E 51ST STE 52ND STS ALAMEDA ST $326,155.00E
E 52ND STE 55TH STS ALAMEDA ST $504,300.00E
E 55TH STE 57TH STS ALAMEDA ST $307,192.50E
E 57TH STE SLAUSON AVES ALAMEDA ST $472,592.25W
E 38TH STE VERNON AVES ALAMEDA ST $851,559.75E
E 27TH STROSS STS ALAMEDA ST $513,894.00E
Total Cost for Street:S ATLANTIC BLVD $1,885,699.50
Survey Street OrientationStart Street End Street Cost
S ATLANTIC BLVD (NEXT TO
OVERPASS)
BANDINI BLVDS ATLANTIC BLVD $215,430.00E
BANDINI BLVDCITY BOUNDARYS ATLANTIC BLVD $270,840.00W
E 52ND DRDISTRICT BLVDS ATLANTIC BLVD $378,492.00SW
DISTRICT BLVDE 52ND DRS ATLANTIC BLVD $113,016.00SE
CITY BOUNDARYS ATLANTIC BLVDS ATLANTIC BLVD $100,105.50E
DISTRICT BLVDSIDEWALK BEGINSS ATLANTIC BLVD $807,816.00W
Total Cost for Street:S BONNIE BEACH PL $484,186.50
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGBANDINI BLVDS BONNIE BEACH PL $120,441.00SE
TRAIN CROSSINGE 26TH STS BONNIE BEACH PL $143,184.00NW
E 26TH STTRAIN CROSSINGS BONNIE BEACH PL $220,561.50SE
Total Cost for Street:S BOYLE AVE $5,427,737.25
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGE 44TH STS BOYLE AVE $122,098.25W
TRAIN CROSSINGE 46TH STS BOYLE AVE $79,062.75E
FRUITLAND AVEE 50TH STS BOYLE AVE $468,579.00W
TRAIN CROSSINGE 54TH STS BOYLE AVE $104,230.25W
TRAIN CROSSINGE SLAUSON AVES BOYLE AVE $903,888.50E
TRAIN CROSSINGE VERNON AVES BOYLE AVE $102,918.75E
SIDEWALK CLOSEDFRUITLAND AVES BOYLE AVE $525,037.00W
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
386
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
TRAIN CROSSINGLEONIS BLVDS BOYLE AVE $118,990.50W
6170 STATE STRANDOLPH STS BOYLE AVE $868,900.75E
E 54TH STSIDEWALK BEGINSS BOYLE AVE $161,045.50W
E 46TH STTRAIN CROSSINGS BOYLE AVE $1,585,551.00W
FRUITLAND AVETRAIN CROSSING (5370 S
BOYLE AVE)
S BOYLE AVE $387,435.00E
Total Cost for Street:S DOWNEY RD $3,777,524.00
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSING5401 S DOWNEY RDS DOWNEY RD $544,986.50W
E WASHINGTON BLVDCITY BOUNDARYS DOWNEY RD $190,642.50W
PACKERS AVEE 45TH STS DOWNEY RD $42,788.00W
FRUITLAND AVEE 50TH STS DOWNEY RD $321,033.50W
E 45TH STE VERNON AVES DOWNEY RD $251,170.50W
5401 S DOWNEY RDFRUITLAND AVES DOWNEY RD $898,491.00W
E 50TH STLEONIS BLVDS DOWNEY RD $408,915.00W
LEONIS BLVDPACKERS AVES DOWNEY RD $368,927.50W
BANDINI BLVDSIDEWALK BEGINSS DOWNEY RD $457,385.50SW
E SLAUSON AVETRAIN CROSSINGS DOWNEY RD $293,184.00W
Total Cost for Street:S INDIANA ST $776,846.25
Survey Street OrientationStart Street End Street Cost
TRAIN CROSSINGBANDINI BLVDS INDIANA ST $135,135.00SW
TRAIN CROSSINGE 26TH STS INDIANA ST $253,507.50NW
E 26TH STTRAIN CROSSINGS INDIANA ST $388,203.75SW
Total Cost for Street:S MAYWOOD AVE $1,130,957.50
Survey Street OrientationStart Street End Street Cost
CONSTRUCTIONCHARTER STS MAYWOOD AVE $16,254.00NE
TRAIN CROSSINGCONSTRUCTIONS MAYWOOD AVE $42,511.50NE
TRAIN CROSSINGDISTRICT BLVDS MAYWOOD AVE $129,361.50E
TRAIN CROSSINGEXCHANGE AVES MAYWOOD AVE $253,298.50W
FRUITLAND AVESIDEWALK BEGINSS MAYWOOD AVE $325,444.50W
DISTRICT BLVDTRAIN CROSSINGS MAYWOOD AVE $364,087.50W
Total Cost for Street:S SANTA FE AVE $7,780,965.00
Survey Street OrientationStart Street End Street Cost
PACIFIC BLVD4600 S SANTA FE AVES SANTA FE AVE $237,690.00E
E 57TH STCITY BOUNDARYS SANTA FE AVE $70,434.00W
E 25TH STE 25TH STS SANTA FE AVE $245,040.50W
E 25TH STE 26TH STS SANTA FE AVE $143,858.75E
E 37TH STE 27TH STS SANTA FE AVE $785,272.50W
E 27TH STE 28TH STS SANTA FE AVE $156,205.00E
E 28TH STE 30TH STS SANTA FE AVE $295,990.75E
E 38TH STE 37TH STS SANTA FE AVE $282,689.25W
E VERNON AVEE 38TH STS SANTA FE AVE $850,546.75W
E 49TH STE 48TH STS SANTA FE AVE $413,905.50W
E 51ST STE 49TH STS SANTA FE AVE $647,320.50W
E 52ND STE 51ST STS SANTA FE AVE $218,538.00W
E 55TH STE 52ND STS SANTA FE AVE $370,928.25W
E 52ND STE 53RD STS SANTA FE AVE $86,782.50E
E 53RD STE 54TH STS SANTA FE AVE $150,081.00E
E 56TH STE 55TH STS SANTA FE AVE $473,356.50W
E 55TH STE 56TH STS SANTA FE AVE $196,209.00E
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
387
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
TRAIN CROSSINGE 57TH STS SANTA FE AVE $374,904.25W
E 48TH STE VERNON AVES SANTA FE AVE $952,080.25W
E 49TH STFRUITLAND AVES SANTA FE AVE $671,872.50E
E VERNON AVEPACIFIC BLVDS SANTA FE AVE $157,259.25E
Total Cost for Street:S SOTO ST $8,478,721.75
Survey Street OrientationStart Street End Street Cost
E 26TH ST2800 S SOTO STS SOTO ST $256,340.00E
E VERNON AVE3855 S SOTO STS SOTO ST $176,175.50W
E 26TH STCITY BOUNDARYS SOTO ST $203,670.00W
E 37TH STE 26TH STS SOTO ST $1,399,346.00W
3851 S SOTO STE 37TH STS SOTO ST $618,598.00W
E VERNON AVEE 44TH STS SOTO ST $359,835.00E
LEONIS BLVDE 46TH STS SOTO ST $754,083.75W
FRUITLAND AVEE 50TH STS SOTO ST $831,358.00W
SEARS STE 54TH STS SOTO ST $1,339,291.75W
E 46TH STE VERNON AVES SOTO ST $973,178.00W
E 54TH STFRUITLAND AVES SOTO ST $607,964.25W
E 50TH STLEONIS BLVDS SOTO ST $721,924.00W
E 54TH STSEARS STS SOTO ST $236,957.50E
Total Cost for Street:S SUNOL DR $527,738.50
Survey Street OrientationStart Street End Street Cost
BANDINI BLVDAYERS AVES SUNOL DR $134,495.50E
AYERS AVEBANDINI BLVDS SUNOL DR $393,243.00W
Total Cost for Street:SACO ST $614,102.25
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSE 37TH STSACO ST $381,842.50E
E 37TH STSIDEWALK BEGINSSACO ST $232,259.75W
Total Cost for Street:SAINT CHARLES ST $470,863.75
Survey Street OrientationStart Street End Street Cost
SIDEWALK ENDSE 45TH STSAINT CHARLES ST $13,140.00W
E VERNON AVEE 46TH STSAINT CHARLES ST $361,042.50E
E 45TH STE VERNON AVESAINT CHARLES ST $96,681.25W
Total Cost for Street:SEVILLE AVE $2,144,382.75
Survey Street OrientationStart Street End Street Cost
E VERNON AVEE 37TH STSEVILLE AVE $639,525.00W
E 46TH STE 45TH STSEVILLE AVE $644,332.50W
SIDEWALK ENDSE 46TH STSEVILLE AVE $252,612.75W
E 45TH STE VERNON AVESEVILLE AVE $222,225.00W
SIDEWALK ENDSFRUITLAND AVESEVILLE AVE $213,390.00E
E 46TH STLEONIS BLVDSEVILLE AVE $154,117.50E
LEONIS BLVDSIDEWALK BEGINSSEVILLE AVE $18,180.00E
Total Cost for Street:SIERRA PINE AVE $755,289.00
Survey Street OrientationStart Street End Street Cost
E 26TH STBANDINI BLVDSIERRA PINE AVE $392,814.00E
BANDINI BLVDE 26TH STSIERRA PINE AVE $362,475.00W
Total Cost for Street:STATE ST $786,144.00
Survey Street OrientationStart Street End Street Cost
E SLAUSON AVE6170 STATE STSTATE ST $775,614.00E
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
388
City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks
RANDOLPH ST (ISLAND END)RANDOLPH ST (ISLAND
START)
STATE ST $10,530.00W
Total Cost for City Sidewalks:$176,074,664.30
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
389
SSA Project # 19033
City of Vernon - Sidewalks - ACS Report
October 2020
SURVEY DATA
390
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
5232 ALCOA AVE
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912121553
Run ID
Alcoa Ave
88.75
ID Sidewalk Width
Priority
feet8.9 Driveway29.3to164955
feet -.2927.4 Vertical Change REF528.4to134882 5 ft
feet36.3 Driveway61.4to164956
feet70.4 Continuous Width SF571.4to $120 $5401674495ft
feet79.9 Driveway101.7to164957
feet .3280.5 Vertical Change REF581.5to134883 5 ft
feet .34101.1 Vertical Change REF5102.1to134884 5 ft
feet 2.0-3.0102.8 Cross Slope (PAR)SF56115.3to $120 $6,7501457005ft
feet 4.0-5.0115.3 Cross Slope (PAR)SF36123.2to $120 $4,2661457015ft
feet 2.0-3.0123.2 Cross Slope (PAR)SF99145.3to $120 $11,9341457025ft
feet137.8 Continuous Width SF5138.8to $120 $5401674505ft
feet -.35143.6 Vertical Change REF5144.6to134885 5 ft
feet -.27146.8 Vertical Change LF5147.8to $75 $3381348865ft
feet 2.0-3.0157.6 Cross Slope (PAR)SF36165.7to $120 $4,3741457035ft
feet 4.0-5.0166.2 Cross Slope (PAR)SF85185.0to $120 $10,1521457045ft
feet170.9 Continuous Width REF5171.9to166864 5 ft
feet .32173.4 Vertical Change REF5174.4to134887 5 ft
feet 6.0-7.0186.2 Cross Slope (PAR)SF12188.8to $120 $1,4041457055ft
feet 5.0-6.0189.7 Cross Slope (PAR)SF36197.7to $120 $4,3201457065ft
feet .28197.1 Vertical Change REF5198.1to134888 5 ft
feet 3.0-4.0197.7 Cross Slope (PAR)SF40206.5to $120 $4,7521457075ft
feet -.27205.6 Vertical Change REF12208.3to134889 5 ft
feet 5.0-6.0206.5 Cross Slope (PAR)SF56219.0to $120 $6,7501457085ft
feet 6.0-7.0220.1 Cross Slope (PAR)SF8221.8to $120 $9181457095ft
feet 5.0-6.0222.2 Cross Slope (PAR)SF7223.8to $120 $8641457105ft
feet 4.0-5.0226.7 Cross Slope (PAR)SF38235.1to $120 $4,5361457115ft
feet -.28228.1 Vertical Change REF5229.1to134890 5 ft
feet 2.0-3.0235.4 Cross Slope (PAR)SF28241.7to $120 $3,4021457125ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
391
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
5232 ALCOA AVE
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912121553
Run ID
Alcoa Ave
88.75
ID Sidewalk Width
Priority
feet238.6 Continuous Width SF5239.6to $120 $5401674515ft
feet 4.0-5.0241.7 Cross Slope (PAR)SF41250.7to $120 $4,8601457135ft
feet 2.0-3.0261.8 Cross Slope (PAR)SF6263.2to $120 $7561457145ft
feet 4.0-5.0263.7 Cross Slope (PAR)SF50274.9to $120 $6,0481457155ft
feet .29273.3 Vertical Change REF5274.3to134891 5 ft
feet 2.0-3.0278.1 Cross Slope (PAR)SF9280.1to $120 $1,0801457165ft
feet 3.0-4.0283.4 Cross Slope (PAR)SF29289.9to $120 $3,5101457175ft
feet -.48284.3 Vertical Change REF5285.3to134892 5 ft
feet289.7 Continuous Width SF5290.7to $120 $5401674525ft
feet 2.0-3.0289.9 Cross Slope (PAR)SF122317.1to $120 $14,6881457185ft
feet -.29295.0 Vertical Change REF5296.0to134893 5 ft
feet -.33316.5 Vertical Change REF5317.5to134894 5 ft
feet318.3 Driveway338.2to164958
feet -.44338.0 Vertical Change REF5339.0to134895 5 ft
feet 4.0-5.0338.8 Cross Slope (PAR)SF72354.8to $120 $8,6401457195ft
feet -.26346.8 Vertical Change REF5347.8to134896 5 ft
feet 2.0-3.0355.3 Cross Slope (PAR)SF6356.7to $120 $7561457205ft
feet366.4 Continuous Width SF5367.4to $120 $5401675005ft
feet 2.0-3.0372.9 Cross Slope (PAR)SF19377.1to $120 $2,2681457215ft
feet383.5 Continuous Width SF5384.5to $120 $5401669245ft
feet 2.0-3.0398.5 Cross Slope (PAR)SF27404.4to $120 $3,1861457225ft
feet .26400.8 Vertical Change REF5401.8to134897 5 ft
feet 4.0-5.0404.6 Cross Slope (PAR)SF23409.8to $120 $2,8081457235ft
feet 3.0-4.0413.3 Cross Slope (PAR)SF10415.6to $120 $1,2421457245ft
feet 6.0-7.0419.1 Cross Slope (PAR)SF28425.4to $120 $3,4021457255ft
feet421.0 Continuous Width REF5422.0to167002 5 ft
feet425.3 Continuous Width SF5426.3to $120 $5401674535ft
feet 5.0-6.0426.4 Cross Slope (PAR)SF5427.4to $120 $5401457265ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
392
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
5232 ALCOA AVE
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912121553
Run ID
Alcoa Ave
88.75
ID Sidewalk Width
Priority
feet 3.0-4.0427.9 Cross Slope (PAR)SF5429.0to $120 $5941457275ft
feet -.68430.7 Vertical Change SF5431.7to $75 $3381348985ft
feet .44432.6 Vertical Change LF5433.6to $75 $3381348995ft
feet 6.0-7.0433.9 Running Slope SF5434.9to $120 $5401664525ft
feet 5.0-6.0434.9 Running Slope SF5436.0to $120 $5941664535ft
feet 3.0-4.0437.3 Cross Slope (PAR)SF5438.3to $120 $5401457285ft
feet .32451.2 Vertical Change LF5452.2to $75 $3381349005ft
feet 3.0-4.0471.8 Cross Slope (PAR)SF5472.8to $120 $5401457295ft
feet 2.0-3.0472.8 Cross Slope (PAR)SF7474.3to $120 $8101457305ft
feet 2.0-3.0476.8 Cross Slope (PAR)SF22481.7to $120 $2,6461457315ft
feet 8.0-9.0489.2 Running Slope SF10491.4to $120 $1,1881664545ft
feet .53493.9 Vertical Change SF5494.9to $75 $3381349015ft
feet 2.0-3.0495.1 Cross Slope (PAR)SF9497.0to $120 $1,0261457325ft
$132,151.50TOTAL COST FOR:ALCOA AVEEside of Starting at:5232 ALCOA AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
393
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
5563 ALCOA AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912121609
Run ID
Alcoa Ave
45.5
ID Sidewalk Width
Priority
feet 3.0-4.01.3 Cross Slope (PAR)SF112.7to $120 $1,3021456278ft
feet 2.0-3.02.7 Cross Slope (PAR)SF24934.8to $120 $29,8531456288ft
feet 2.0-3.037.9 Cross Slope (PAR)SF1139.3to $120 $1,3021456298ft
feet 2.0-3.043.3 Cross Slope (PAR)SF17866.3to $120 $21,3901456308ft
feet -.2652.4 Vertical Change REF853.4to134836 8 ft
feet 2.0-3.070.5 Cross Slope (PAR)SF2073.1to $120 $2,4181456318ft
feet 2.0-3.075.4 Cross Slope (PAR)SF1577.3to $120 $1,7671456328ft
feet 4.0-5.077.8 Cross Slope (PAR)SF3982.8to $120 $4,6501456338ft
feet 2.0-3.082.8 Cross Slope (PAR)SF153102.6to $120 $18,4141456348ft
feet 4.0-5.0103.3 Cross Slope (PAR)SF74112.8to $120 $8,8351456358ft
feet -.26113.2 Vertical Change LF8114.2to $75 $5811348378ft
feet 4.0-5.0115.8 Cross Slope (PAR)SF612194.8to $120 $73,4701456368ft
feet -.27181.1 Vertical Change REF8182.1to134838 8 ft
feet 2.0-3.0194.8 Cross Slope (PAR)SF40199.9to $120 $4,7431456378ft
feet 4.0-5.0200.3 Cross Slope (PAR)SF26203.6to $120 $3,0691456388ft
feet .27201.8 Vertical Change REF8202.8to134839 8 ft
feet 6.0-7.0207.6 Cross Slope (PAR)SF16209.6to $120 $1,8601456398ft
feet 5.0-6.0209.6 Cross Slope (PAR)SF27213.1to $120 $3,2551456408ft
feet 6.0-7.0213.3 Cross Slope (PAR)SF11214.7to $120 $1,3021456418ft
feet 4.0-5.0219.3 Cross Slope (PAR)SF175241.9to $120 $21,0181456428ft
feet -.32229.4 Vertical Change REF8230.4to134840 8 ft
feet 2.0-3.0241.9 Cross Slope (PAR)SF32246.0to $120 $3,8131456438ft
feet 4.0-5.0246.8 Cross Slope (PAR)SF43252.3to $120 $5,1151456448ft
feet 2.0-3.0252.3 Cross Slope (PAR)SF29256.0to $120 $3,4411456458ft
feet256.1 Driveway293.8to164948
$211,598.25TOTAL COST FOR:ALCOA AVEWside of Starting at:5563 ALCOA AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
394
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
6118 ALCOA AVE (OPP
SIDE OF ST)
Survey Street Name Starting Street Name
MALBURG WY
End Street Name
1912121316
Run ID
Alcoa Ave
106.5
ID Sidewalk Width
Priority
feet 11.0-12.04.7 Cross Slope (PAR)SF247.9to $120 $2,8801460898ft
feet 9.0-10.08.9 Cross Slope (PAR)SF3213.2to $120 $3,8701460908ft
feet 2.2613.3 Vertical Change REF814.3to135217 8 ft
feet 11.0-12.014.2 Cross Slope (PAR)SF2317.3to $120 $2,7901460918ft
feet 4.0-5.020.9 Cross Slope (PAR)SF1122.3to $120 $1,2601460928ft
feet 3.0-4.024.6 Cross Slope (PAR)SF4630.7to $120 $5,4901460938ft
feet 2.0-3.030.9 Cross Slope (PAR)SF19857.3to $120 $23,7601460948ft
feet .3436.2 Vertical Change REF837.2to135218 8 ft
feet 4.0-5.057.3 Cross Slope (PAR)SF2660.8to $120 $3,1501460958ft
feet 2.0-3.060.8 Cross Slope (PAR)SF7971.3to $120 $9,4501460968ft
feet72.7 Driveway99.0to164991
feet 2.0-3.0104.5 Cross Slope (PAR)SF40109.8to $120 $4,7701460978ft
feet 4.0-5.0111.0 Cross Slope (PAR)SF49117.5to $120 $5,8501460988ft
feet 3.0-4.0119.7 Cross Slope (PAR)SF77129.9to $120 $9,1801460998ft
feet130.3 Driveway155.2to164992
feet .3130.4 Vertical Change REF8131.4to135219 8 ft
feet 2.0-3.0155.8 Cross Slope (PAR)SF82166.8to $120 $9,9001461008ft
feet 4.0-5.0167.8 Cross Slope (PAR)SF68176.8to $120 $8,1001461018ft
feet 2.0-3.0176.8 Cross Slope (PAR)SF59184.7to $120 $7,1101461028ft
feet 4.0-5.0184.9 Cross Slope (PAR)SF35189.5to $120 $4,1401461038ft
feet 3.0-4.0192.3 Cross Slope (PAR)SF16194.4to $120 $1,8901461048ft
feet 2.0-3.0198.5 Cross Slope (PAR)SF14200.3to $120 $1,6201461058ft
feet 2.0-3.0202.4 Cross Slope (PAR)SF29206.2to $120 $3,4201461068ft
feet 3.0-4.0208.8 Cross Slope (PAR)SF11210.2to $120 $1,2601461078ft
feet 4.0-5.0212.9 Cross Slope (PAR)SF187237.8to $120 $22,4101461088ft
feet -.27226.1 Vertical Change REF8227.1to135220 8 ft
feet -.27229.7 Vertical Change REF8230.7to135221 8 ft
feet 2.0-3.0237.8 Cross Slope (PAR)SF246270.6to $120 $29,5201461098ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
395
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
6118 ALCOA AVE (OPP
SIDE OF ST)
Survey Street Name Starting Street Name
MALBURG WY
End Street Name
1912121316
Run ID
Alcoa Ave
106.5
ID Sidewalk Width
Priority
feet .32244.4 Vertical Change REF8245.4to135222 8 ft
feet 2.0-3.0273.0 Cross Slope (PAR)SF126289.8to $120 $15,1201461108ft
feet -.28277.8 Vertical Change REF8278.8to135223 8 ft
feet 4.0-5.0289.8 Cross Slope (PAR)SF64298.3to $120 $7,6501461118ft
feet 2.0-3.0298.3 Cross Slope (PAR)SF105312.3to $120 $12,6001461128ft
feet 2.0-3.0315.8 Cross Slope (PAR)SF146335.2to $120 $17,4601461138ft
feet 4.0-5.0335.2 Cross Slope (PAR)SF8336.2to $120 $9001461148ft
feet 4.0-5.0338.3 Cross Slope (PAR)SF20340.9to $120 $2,3401461158ft
feet 5.0-6.0344.2 Cross Slope (PAR)SF31348.3to $120 $3,6901461168ft
feet 3.0-4.0348.3 Cross Slope (PAR)SF10349.6to $120 $1,1701461178ft
feet 2.0-3.0349.8 Cross Slope (PAR)SF131367.3to $120 $15,7501461188ft
feet .31359.4 Vertical Change REF8360.4to135224 8 ft
feet 4.0-5.0367.3 Cross Slope (PAR)SF113382.3to $120 $13,5001461198ft
feet 2.0-3.0382.3 Cross Slope (PAR)SF94394.8to $120 $11,2501461208ft
feet 4.0-5.0396.1 Cross Slope (PAR)SF183420.5to $120 $21,9601461218ft
feet 2.0-3.0420.5 Cross Slope (PAR)SF119436.4to $120 $14,3101461228ft
feet .54422.5 Vertical Change REF8423.5to135225 8 ft
feet 4.0-5.0437.1 Cross Slope (PAR)SF24440.3to $120 $2,8801461238ft
feet 2.0-3.0440.3 Cross Slope (PAR)SF302480.6to $120 $36,2701461248ft
feet 4.0-5.0480.8 Cross Slope (PAR)SF320523.5to $120 $38,4301461258ft
feet 2.0-3.0523.5 Cross Slope (PAR)SF10524.8to $120 $1,1701461268ft
feet525.0 Driveway540.4to164993
feet 4.0-5.0541.8 Cross Slope (PAR)SF178565.5to $120 $21,3301461278ft
feet .33564.0 Vertical Change REF8565.0to135226 8 ft
feet 3.0-4.0567.7 Cross Slope (PAR)SF13569.4to $120 $1,5301461288ft
feet 2.0-3.0569.4 Cross Slope (PAR)SF17571.6to $120 $1,9801461298ft
feet572.6 Continuous Width SF8573.6to $120 $9001676158ft
feet573.7 Driveway611.7to164994
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
396
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
6118 ALCOA AVE (OPP
SIDE OF ST)
Survey Street Name Starting Street Name
MALBURG WY
End Street Name
1912121316
Run ID
Alcoa Ave
106.5
ID Sidewalk Width
Priority
feet -.28583.0 Vertical Change REF8584.0to135227 8 ft
feet 4.0-5.0611.7 Cross Slope (Driveway)SF234642.9to $40 $9,3601461308ft
feet620.4 Continuous Width SF8621.4to $120 $9001667998ft
feet 2.84624.1 Vertical Change REF8625.1to135228 8 ft
feet .58628.1 Vertical Change REF8629.1to135229 8 ft
feet 2.0-3.0642.9 Cross Slope (PAR)SF64651.4to $120 $7,6501461318ft
feet648.8 Continuous Width SF8649.8to $120 $9001664088ft
feet 2.0-3.0655.3 Cross Slope (PAR)SF178679.0to $120 $21,3301461328ft
feet 4.0-5.0680.9 Cross Slope (PAR)SF184705.4to $120 $22,0501461338ft
feet 2.94682.6 Vertical Change REF8683.6to135231 8 ft
feet689.7 Continuous Width SF8690.7to $120 $9001670298ft
feet -.26698.5 Vertical Change REF8699.5to135232 8 ft
feet 6.0-7.0710.5 Cross Slope (PAR)SF9711.7to $120 $1,0801461348ft
feet 5.0-6.0711.7 Cross Slope (PAR)SF17714.0to $120 $2,0701461358ft
feet 6.0-7.0718.3 Cross Slope (PAR)SF17720.5to $120 $1,9801461368ft
$472,230.00TOTAL COST FOR:ALCOA AVEWside of Starting at:6118 ALCOA AVE (OPP SIDE OF
ST)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
397
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
6140 ALCOA AVE
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121045
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet 3.0-4.00.5 Cross Slope (PAR)SF142.3to $120 $1,6741465118ft
feet 2.0-3.02.3 Cross Slope (PAR)SF478.3to $120 $5,5801465128ft
feet 4.0-5.08.3 Cross Slope (PAR)SF3312.6to $120 $3,9991465138ft
feet13.9 Driveway39.3to165025
feet 3.0-4.041.1 Cross Slope (PAR)SF942.2to $120 $1,0231465148ft
feet .3343.0 Vertical Change LF844.0to $75 $5811353518ft
feet 3.0-4.050.5 Cross Slope (PAR)SF6659.0to $120 $7,9051465158ft
feet 5.0-6.059.4 Cross Slope (PAR)SF16780.9to $120 $19,9951465168ft
feet -.2765.5 Vertical Change REF866.5to135352 8 ft
feet 3.0-4.080.9 Cross Slope (PAR)SF184104.6to $120 $22,0411465178ft
feet 5.0-6.0104.6 Cross Slope (PAR)SF42110.0to $120 $5,0221465188ft
feet 3.0-4.0110.9 Cross Slope (PAR)SF627191.8to $120 $75,2371465198ft
feet .28158.8 Vertical Change REF8159.8to135353 8 ft
feet -.26180.8 Vertical Change REF8181.8to135354 8 ft
feet 3.0-4.0194.8 Cross Slope (PAR)SF22197.6to $120 $2,6041465208ft
feet 5.0-6.0198.6 Cross Slope (PAR)SF16200.6to $120 $1,8601465218ft
feet 2.0-3.0203.1 Cross Slope (PAR)SF31207.1to $120 $3,7201465228ft
feet 4.0-5.0207.1 Cross Slope (PAR)SF29210.8to $120 $3,4411465238ft
feet 2.0-3.0210.8 Cross Slope (PAR)SF19213.2to $120 $2,2321465248ft
feet213.2 Driveway252.6to165026
feet 2.0-3.0252.8 Cross Slope (Driveway)SF29256.5to $40 $1,1471465258ft
feet 2.0-3.0258.9 Cross Slope (PAR)SF38263.8to $120 $4,5571465268ft
feet 1.02259.0 Vertical Change REF8260.0to135355 8 ft
feet -.29264.4 Vertical Change LF26267.7to $75 $1,9181353568ft
feet 3.0-4.0265.9 Cross Slope (PAR)SF61273.8to $120 $7,3471465278ft
feet .38269.0 Vertical Change REF8270.0to135357 8 ft
feet 2.0-3.0273.8 Cross Slope (PAR)SF12275.3to $120 $1,3951465288ft
feet -.27276.0 Vertical Change LF8277.0to $75 $5811353588ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
398
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
6140 ALCOA AVE
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121045
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet276.1 Driveway314.8to165027
feet 2.0-3.0316.5 Cross Slope (PAR)SF37321.3to $120 $4,4641465298ft
feet -.31319.6 Vertical Change REF8320.6to135360 8 ft
feet 4.0-5.0321.3 Cross Slope (PAR)SF871433.7to $120 $104,5321465308ft
feet .35376.4 Vertical Change REF8377.4to135361 8 ft
feet -.29394.5 Vertical Change REF8395.5to135363 8 ft
feet .52428.6 Vertical Change REF8429.6to135364 8 ft
feet 4.0-5.0436.0 Cross Slope (PAR)SF189460.4to $120 $22,6921465318ft
feet .3448.0 Vertical Change REF8449.0to135365 8 ft
feet .59458.7 Vertical Change REF8459.7to135366 8 ft
feet 7.0-8.0461.3 Cross Slope (PAR)SF31465.3to $120 $3,7201465328ft
feet -.54463.6 Vertical Change REF8464.6to135367 8 ft
feet 5.0-6.0465.3 Cross Slope (PAR)SF50471.8to $120 $6,0451465338ft
feet .75471.0 Vertical Change REF8472.0to135369 8 ft
feet 3.0-4.0471.8 Cross Slope (PAR)SF8472.8to $120 $9301465348ft
feet 2.0-3.0472.8 Cross Slope (PAR)SF9473.9to $120 $1,0231465358ft
feet 2.0-3.0476.3 Cross Slope (PAR)SF42481.7to $120 $5,0221465368ft
feet 4.0-5.0481.7 Cross Slope (PAR)SF94493.8to $120 $11,2531465378ft
feet 4.0-5.0496.1 Cross Slope (PAR)SF25499.3to $120 $2,9761465388ft
feet -.31497.8 Vertical Change REF8498.8to135370 8 ft
feet 5.0-6.0501.8 Cross Slope (PAR)SF85512.8to $120 $10,2301465398ft
feet .4510.4 Vertical Change REF22513.3to135371 8 ft
feet 5.0-6.0515.6 Cross Slope (PAR)SF87526.8to $120 $10,4161465408ft
feet 3.0-4.0526.8 Cross Slope (PAR)SF120542.3to $120 $14,4151465418ft
feet -.26527.6 Vertical Change REF8528.6to135372 8 ft
feet .62532.0 Vertical Change REF8533.0to135373 8 ft
feet -.34538.2 Vertical Change REF8539.2to135374 8 ft
feet 5.0-6.0542.8 Cross Slope (PAR)SF370590.5to $120 $44,3611465428ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
399
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
6140 ALCOA AVE
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121045
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet -.3548.9 Vertical Change REF8549.9to135375 8 ft
feet .62551.8 Vertical Change REF8552.8to135376 8 ft
feet -.42581.0 Vertical Change REF8582.0to135377 8 ft
feet .41585.4 Vertical Change REF8586.4to135378 8 ft
feet 6.0-7.0591.7 Cross Slope (PAR)SF16593.8to $120 $1,9531465438ft
feet 7.0-8.0596.3 Cross Slope (PAR)SF81606.8to $120 $9,7651465448ft
feet -.35598.2 Vertical Change REF8599.2to135379 8 ft
feet 5.0-6.0606.8 Cross Slope (PAR)SF21609.5to $120 $2,5111465458ft
feet 6.0-7.0610.0 Cross Slope (PAR)SF12611.5to $120 $1,3951465468ft
feet 5.0-6.0611.7 Cross Slope (PAR)SF36616.3to $120 $4,2781465478ft
feet 1.91616.5 Vertical Change SF8617.5to $75 $5811353808ft
feet617.3 Driveway649.7to165028
feet 2.0-3.0649.7 Cross Slope (Driveway)SF13651.4to $40 $5271465488ft
feet 4.0-5.0652.3 Cross Slope (PAR)SF126668.6to $120 $15,1591465498ft
feet 2.31652.8 Vertical Change REF8653.8to135381 8 ft
feet 2.95657.3 Vertical Change REF8658.3to135382 8 ft
feet 3.51659.6 Vertical Change REF8660.6to135383 8 ft
feet -.51661.7 Vertical Change REF8662.7to135384 8 ft
feet 2.0-3.0669.1 Cross Slope (PAR)SF26672.4to $120 $3,0691465508ft
feet 3.46673.2 Vertical Change REF26676.5to135385 8 ft
feet 4.0-5.0673.2 Cross Slope (PAR)SF35677.7to $120 $4,1851465518ft
feet678.4 Driveway711.3to165029
feet 3.57680.0 Vertical Change REF8681.0to135386 8 ft
feet 3.0-4.0711.8 Cross Slope (PAR)SF81722.3to $120 $9,7651465528ft
feet 2.0-3.0723.2 Cross Slope (PAR)SF24726.3to $120 $2,8831465538ft
feet 4.0-5.0726.3 Cross Slope (PAR)SF150745.6to $120 $17,9491465548ft
feet 3.0-4.0748.2 Cross Slope (PAR)SF145766.9to $120 $17,3911465558ft
feet 2.0-3.0766.9 Cross Slope (PAR)SF9768.1to $120 $1,1161465568ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
400
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
6140 ALCOA AVE
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121045
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet 2.0-3.0772.8 Cross Slope (PAR)SF12774.3to $120 $1,3951465578ft
feet 2.0-3.0780.0 Cross Slope (PAR)SF157800.3to $120 $18,8791465588ft
feet 4.0-5.0800.6 Cross Slope (PAR)SF584875.9to $120 $70,0291465598ft
feet 2.0-3.0876.9 Cross Slope (PAR)SF19879.3to $120 $2,2321465608ft
feet880.1 Driveway913.3to165030
feet .36901.3 Vertical Change REF8902.3to135387 8 ft
feet 3.0-4.0913.9 Cross Slope (PAR)SF29917.6to $120 $3,4411465618ft
feet 5.0-6.0918.5 Cross Slope (PAR)SF45924.3to $120 $5,3941465628ft
feet -.26918.6 Vertical Change REF8919.6to135388 8 ft
feet 3.0-4.0924.3 Cross Slope (PAR)SF8925.3to $120 $9301465638ft
feet 3.0-4.0928.2 Cross Slope (PAR)SF30932.1to $120 $3,6271465648ft
feet 2.0-3.0932.1 Cross Slope (PAR)SF79942.3to $120 $9,4861465658ft
feet 4.0-5.0942.3 Cross Slope (PAR)SF65950.7to $120 $7,8121465668ft
feet 3.0-4.0952.8 Cross Slope (PAR)SF225981.8to $120 $26,9701465678ft
feet -.31984.0 Vertical Change LF8985.0to $75 $5811353898ft
feet 5.0-6.0986.3 Cross Slope (PAR)SF56993.5to $120 $6,6961465688ft
feet 3.0-4.0993.8 Cross Slope (PAR)SF781003.8to $120 $9,3001465698ft
feet 3.0-4.01006.2 Cross Slope (PAR)SF1061019.9to $120 $12,7411465708ft
feet 2.0-3.01019.9 Cross Slope (PAR)SF1741042.4to $120 $20,9251465718ft
feet 4.0-5.01042.8 Cross Slope (PAR)SF1541062.7to $120 $18,5071465728ft
feet 2.0-3.01062.7 Cross Slope (PAR)SF691071.6to $120 $8,2771465738ft
feet 2.0-3.01073.8 Cross Slope (PAR)SF1121088.3to $120 $13,4851465748ft
feet 4.0-5.01088.7 Cross Slope (PAR)SF431094.3to $120 $5,2081465758ft
feet 2.0-3.01095.1 Cross Slope (PAR)SF1061108.8to $120 $12,7411465768ft
feet 4.0-5.01109.4 Cross Slope (PAR)SF301113.3to $120 $3,6271465778ft
feet1114.5 Driveway1148.6to165031
feet .41125.1 Vertical Change REF81126.1to135390 8 ft
feet 2.0-3.01148.6 Cross Slope (Driveway)SF131150.3to $40 $5271465788ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
401
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
6140 ALCOA AVE
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121045
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet 4.0-5.01152.3 Cross Slope (PAR)SF531159.1to $120 $6,3241465798ft
feet 4.0-5.01161.2 Cross Slope (PAR)SF4421218.2to $120 $53,0101465808ft
$830,610.13TOTAL COST FOR:ALCOA AVEEside of Starting at:6140 ALCOA AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
402
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S / E ALCOA AVE
Street Side
6199 MALBURG WY
Survey Street Name Starting Street Name
6140 ALCOA AVE
End Street Name
1912121012
Run ID
Alcoa Ave
78.25
ID Sidewalk Width
Priority
feet .352.3 Vertical Change LF43.3to $75 $3001353914ft
feet 5.0-6.04.5 Running Slope SF55.8to $120 $6241664574ft
feet -.265.6 Vertical Change LF46.6to $75 $3001353924ft
feet 2.0-3.06.8 Cross Slope (PAR)SF6222.4to $120 $7,4881465814ft
feet .289.5 Vertical Change REF410.5to135393 4 ft
feet 1.0312.7 Vertical Change REF413.7to135394 4 ft
feet 1.8315.1 Vertical Change REF416.1to135395 4 ft
feet22.4 Cold Patch 1425.8to140301 4 ft
feet 2.0-3.026.2 Cross Slope (PAR)SF12256.7to $120 $14,6401465824ft
feet .2754.5 Vertical Change REF455.5to135396 4 ft
feet 4.0-5.056.7 Cross Slope (PAR)SF3565.4to $120 $4,1761465834ft
feet 2.0-3.065.4 Cross Slope (PAR)SF666.9to $120 $7201465844ft
feet -.5966.3 Vertical Change REF467.3to135398 4 ft
feet .5770.9 Vertical Change SF471.9to $75 $3001353994ft
feet .5174.1 Vertical Change SF1176.8to $75 $8101354004ft
feet100.1 Cold Patch 12103.0to140302 4 ft
feet -.27107.5 Vertical Change LF4108.5to $75 $3001354014ft
feet 2.0-3.0109.3 Cross Slope (PAR)SF10111.7to $120 $1,1521465854ft
feet .59113.7 Vertical Change SF4114.7to $75 $3001354034ft
feet -.38115.4 Vertical Change LF4116.4to $75 $3001354044ft
feet .29117.2 Vertical Change LF4118.2to $75 $3001354054ft
feet .27120.6 Vertical Change LF4121.6to $75 $3001354064ft
feet -.39122.9 Vertical Change LF4123.9to $75 $3001354074ft
feet .79125.0 Vertical Change SF4126.0to $75 $3001354084ft
feet .44126.8 Vertical Change LF17131.1to $75 $1,2901354094ft
feet .37133.9 Vertical Change LF4134.9to $75 $3001354104ft
feet146.0 Cold Patch 14149.5to140303 4 ft
feet -.28148.3 Vertical Change LF4149.3to $75 $3001354114ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
403
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S / E ALCOA AVE
Street Side
6199 MALBURG WY
Survey Street Name Starting Street Name
6140 ALCOA AVE
End Street Name
1912121012
Run ID
Alcoa Ave
78.25
ID Sidewalk Width
Priority
feet 2.0-3.0150.1 Cross Slope (PAR)SF79169.8to $120 $9,4561465864ft
feet 2.91168.0 Vertical Change REF4169.0to135412 4 ft
feet .67175.9 Vertical Change REF4176.9to135413 4 ft
feet 2.0-3.0176.0 Cross Slope (PAR)SF23181.7to $120 $2,7361465874ft
feet 4.0-5.0181.7 Cross Slope (PAR)SF15185.4to $120 $1,7761465884ft
feet 2.0-3.0185.4 Cross Slope (PAR)SF8187.5to $120 $1,0081465894ft
feet187.5 Driveway213.9to165032
feet 2.87189.2 Vertical Change REF4190.2to135414 4 ft
feet -.28210.6 Vertical Change REF4211.6to135415 4 ft
feet .74212.4 Vertical Change REF4213.4to135416 4 ft
feet 3.0-4.0213.9 Cross Slope (Driveway)SF62229.5to $40 $2,4961465904ft
feet -.37221.0 Vertical Change REF12223.9to135417 4 ft
feet 2.0-3.0230.3 Cross Slope (PAR)SF75249.1to $120 $9,0241465914ft
feet 4.0-5.0249.1 Cross Slope (PAR)SF160289.1to $120 $19,2001465924ft
feet -.46284.3 Vertical Change REF4285.3to135419 4 ft
feet .51290.4 Vertical Change SF4291.4to $75 $3001354204ft
feet 4.0-5.0292.7 Cross Slope (PAR)SF33301.0to $120 $3,9841465934ft
feet 2.0-3.0301.0 Cross Slope (PAR)SF67317.8to $120 $8,0641465944ft
feet -.49312.6 Vertical Change REF4313.6to135421 4 ft
feet 2.14316.7 Vertical Change REF4317.7to135422 4 ft
feet317.9 Driveway348.9to165033
feet 2.0-3.0349.8 Cross Slope (PAR)SF196398.7to $120 $23,4721465954ft
feet 3.0-4.0405.8 Cross Slope (PAR)SF46417.3to $120 $5,5201465964ft
feet 2.0-3.0417.3 Cross Slope (PAR)SF53430.6to $120 $6,3841465974ft
feet 4.0-5.0431.7 Cross Slope (PAR)SF34440.1to $120 $4,0321465984ft
feet 2.0-3.0440.1 Cross Slope (PAR)SF70457.6to $120 $8,4001465994ft
feet 3.0-4.0460.3 Cross Slope (PAR)SF20465.2to $120 $2,3521466004ft
feet 3.0-4.0468.8 Cross Slope (PAR)SF67485.5to $120 $8,0161466014ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
404
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S / E ALCOA AVE
Street Side
6199 MALBURG WY
Survey Street Name Starting Street Name
6140 ALCOA AVE
End Street Name
1912121012
Run ID
Alcoa Ave
78.25
ID Sidewalk Width
Priority
feet 3.0-4.0487.7 Cross Slope (PAR)SF144523.8to $120 $17,3281466024ft
feet 2.0-3.0523.8 Cross Slope (PAR)SF15527.5to $120 $1,7761466034ft
feet 4.0-5.0527.5 Cross Slope (PAR)SF197576.8to $120 $23,6641466044ft
feet -.31549.1 Vertical Change REF4550.1to135423 4 ft
feet .48573.2 Vertical Change REF4574.2to135424 4 ft
feet 2.0-3.0577.8 Cross Slope (PAR)SF36586.9to $120 $4,3681466054ft
feet 4.0-5.0586.9 Cross Slope (PAR)SF61602.1to $120 $7,2961466064ft
feet .62601.4 Vertical Change REF4602.4to135425 4 ft
feet 2.0-3.0603.2 Cross Slope (PAR)SF50615.8to $120 $6,0481466074ft
feet 5.0-6.0618.3 Cross Slope (PAR)SF169660.6to $120 $20,3041466084ft
feet 3.0-4.0661.0 Cross Slope (PAR)SF9663.2to $120 $1,0561466094ft
feet665.4 Driveway698.4to165034
feet .31680.9 Vertical Change REF4681.9to135426 4 ft
feet 2.0-3.0698.8 Cross Slope (PAR)SF52711.9to $120 $6,2881466104ft
feet 4.0-5.0711.9 Cross Slope (PAR)SF52724.9to $120 $6,2401466114ft
feet 2.0-3.0726.0 Cross Slope (PAR)SF50738.6to $120 $6,0481466124ft
feet 4.0-5.0740.9 Cross Slope (PAR)SF4742.0to $120 $5281466134ft
feet742.5 Driveway773.5to165035
feet .32742.8 Vertical Change REF4743.8to135427 4 ft
feet .26757.9 Vertical Change REF4758.9to135428 4 ft
feet 2.0-3.0775.3 Cross Slope (PAR)SF30782.9to $120 $3,6481466144ft
feet 4.0-5.0782.9 Cross Slope (PAR)SF20787.9to $120 $2,4001466154ft
feet 2.0-3.0787.9 Cross Slope (PAR)SF51800.6to $120 $6,0961466164ft
feet 4.0-5.0800.6 Cross Slope (PAR)SF22806.0to $120 $2,5921466174ft
feet .26800.7 Vertical Change REF4801.7to135429 4 ft
feet .32807.3 Vertical Change LF4808.3to $75 $3001354304ft
feet809.8 Driveway846.6to165036
feet .27838.9 Vertical Change REF4839.9to135431 4 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
405
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S / E ALCOA AVE
Street Side
6199 MALBURG WY
Survey Street Name Starting Street Name
6140 ALCOA AVE
End Street Name
1912121012
Run ID
Alcoa Ave
78.25
ID Sidewalk Width
Priority
feet 3.0-4.0847.0 Cross Slope (Driveway)SF6848.5to $40 $2401466184ft
feet 6.0-7.0849.7 Cross Slope (PAR)SF20854.7to $120 $2,4001466194ft
feet 5.0-6.0854.7 Cross Slope (PAR)SF47866.4to $120 $5,6161466204ft
feet -.33863.5 Vertical Change REF4864.5to135432 4 ft
feet 3.0-4.0866.4 Cross Slope (PAR)SF64882.3to $120 $7,6321466214ft
feet 3.0-4.0884.5 Cross Slope (PAR)SF218938.9to $120 $26,1121466224ft
feet -.27938.5 Vertical Change REF4939.5to135433 4 ft
feet 2.0-3.0938.9 Cross Slope (PAR)SF73957.2to $120 $8,7841466234ft
feet .28943.1 Vertical Change REF4944.1to135434 4 ft
feet -.27949.4 Vertical Change REF4950.4to135435 4 ft
feet 3.0-4.0960.3 Cross Slope (PAR)SF19965.1to $120 $2,3041466244ft
feet 2.0-3.0965.7 Cross Slope (PAR)SF46977.3to $120 $5,5681466254ft
$325,356.00TOTAL COST FOR:ALCOA AVES / E side of Starting at:6199 MALBURG WY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
406
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E 44TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001141543
Run ID
Alcoa Ave
54
ID Sidewalk Width
Priority
feet 2.0-3.04.8 Cross Slope (PAR)SF4510.8to $120 $5,4001532078ft
feet -1.57.4 Vertical Change REF88.4to137208 8 ft
feet 4.0-5.012.3 Cross Slope (PAR)SF2916.1to $120 $3,4201532088ft
feet 2.0-3.017.3 Cross Slope (PAR)SF1419.1to $120 $1,6201532098ft
feet .2917.7 Vertical Change REF818.7to137209 8 ft
feet 4.0-5.020.4 Cross Slope (PAR)SF10534.4to $120 $12,6001532108ft
feet 3.0-4.037.3 Cross Slope (PAR)SF4042.6to $120 $4,7701532118ft
feet 3.0-4.045.7 Cross Slope (PAR)SF5753.3to $120 $6,8401532128ft
feet 3.0-4.058.8 Cross Slope (PAR)SF347105.1to $120 $41,6701532138ft
feet .3696.7 Vertical Change REF897.7to137210 8 ft
feet 2.0-3.0105.3 Cross Slope (PAR)SF18107.7to $120 $2,1601532148ft
feet 1.11106.5 Vertical Change REF8107.5to137211 8 ft
feet 2.0-3.0119.7 Cross Slope (PAR)SF12121.3to $120 $1,4401532158ft
feet123.5 Driveway145.3to165603
feet 3.0-4.0145.3 Cross Slope (Driveway)SF68154.4to $40 $2,7301532168ft
feet 4.0-5.0156.6 Cross Slope (PAR)SF202183.5to $120 $24,2101532178ft
feet158.8 Continuous Width SF8159.8to $120 $9001673878ft
feet177.8 Continuous Width SF8178.8to $120 $9001673748ft
feet 2.0-3.0183.5 Cross Slope (PAR)SF72193.1to $120 $8,6401532188ft
feet 4.0-5.0194.3 Cross Slope (PAR)SF10195.6to $120 $1,1701532198ft
feet 3.0-4.0200.3 Cross Slope (PAR)SF20202.9to $120 $2,3401532208ft
feet 2.0-3.0203.2 Cross Slope (PAR)SF17205.4to $120 $1,9801532218ft
feet205.3 Continuous Width SF8206.3to $120 $9001668028ft
feet 2.0-3.0209.7 Cross Slope (PAR)SF9210.9to $120 $1,0801532228ft
feet 2.0-3.0216.9 Cross Slope (PAR)SF23219.9to $120 $2,7001532238ft
feet 4.0-5.0219.9 Cross Slope (PAR)SF33224.3to $120 $3,9601532248ft
feet221.5 Continuous Width SF8222.5to $120 $9001672788ft
feet224.8 Driveway251.7to165604
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
407
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E 44TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001141543
Run ID
Alcoa Ave
54
ID Sidewalk Width
Priority
feet -.26231.9 Vertical Change REF8232.9to137213 8 ft
$132,330.00TOTAL COST FOR:ALCOA AVEEside of Starting at:E 44TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
408
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 44TH ST
Survey Street Name Starting Street Name
E 46TH ST
End Street Name
2001141509
Run ID
Alcoa Ave
58
ID Sidewalk Width
Priority
feet 3.0-4.01.3 Cross Slope (PAR)SF20323.2to $120 $24,3091533589ft
feet .7923.6 Vertical Change REF924.6to137240 9 ft
feet 2.0-3.023.8 Cross Slope (PAR)SF20846.3to $120 $24,9751533599ft
feet -1.0850.5 Vertical Change SF951.5to $75 $6941372419ft
feet 2.0-3.052.1 Cross Slope (PAR)SF2454.7to $120 $2,8861533609ft
feet 2.0-3.059.9 Cross Slope (PAR)SF5265.5to $120 $6,2161533619ft
feet -.3568.4 Vertical Change LF969.4to $75 $6941372429ft
feet 3.0-4.070.3 Cross Slope (PAR)SF1271.6to $120 $1,4431533629ft
feet -.4272.0 Vertical Change REF973.0to137243 9 ft
feet 2.0-3.072.4 Cross Slope (PAR)SF1874.3to $120 $2,1091533639ft
feet -.3476.4 Vertical Change REF977.4to137244 9 ft
feet 2.0-3.077.0 Cross Slope (PAR)SF12090.0to $120 $14,4301533649ft
feet .5889.2 Vertical Change REF990.2to137245 9 ft
feet92.1 Continuous Width SF993.1to $120 $1,1101676449ft
feet 2.0-3.092.9 Cross Slope (PAR)SF155109.7to $120 $18,6481533659ft
feet105.3 Continuous Width REF9106.3to167757 9 ft
feet 4.0-5.0109.7 Cross Slope (PAR)SF148125.7to $120 $17,7601533669ft
feet 2.0-3.0126.0 Cross Slope (PAR)SF260154.1to $120 $31,1911533679ft
feet 2.0-3.0169.3 Cross Slope (PAR)SF148185.3to $120 $17,7601533689ft
feet 2.0-3.0190.0 Cross Slope (PAR)SF24192.6to $120 $2,8861533699ft
feet 4.0-5.0192.6 Cross Slope (PAR)SF47197.7to $120 $5,6611533709ft
feet197.6 Continuous Width REF9198.6to167758 9 ft
feet 2.0-3.0197.7 Cross Slope (PAR)SF20199.9to $120 $2,4421533719ft
feet 3.0-4.0205.0 Cross Slope (PAR)SF25207.7to $120 $2,9971533729ft
feet 2.0-3.0207.7 Cross Slope (PAR)SF84216.8to $120 $10,1011533739ft
feet 4.0-5.0216.8 Cross Slope (PAR)SF176235.8to $120 $21,0901533749ft
feet236.3 Driveway253.6to165614
feet 3.0-4.0256.3 Cross Slope (PAR)SF53262.0to $120 $6,3271533759ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
409
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 44TH ST
Survey Street Name Starting Street Name
E 46TH ST
End Street Name
2001141509
Run ID
Alcoa Ave
58
ID Sidewalk Width
Priority
feet258.5 Continuous Width SF9259.5to $120 $1,1101668109ft
feet 4.0-5.0264.3 Cross Slope (PAR)SF19266.4to $120 $2,3311533769ft
feet 2.0-3.0269.9 Cross Slope (PAR)SF12271.2to $120 $1,4431533779ft
feet 3.0-4.0274.1 Cross Slope (PAR)SF43278.8to $120 $5,2171533789ft
feet 2.0-3.0279.2 Cross Slope (PAR)SF157296.2to $120 $18,8701533799ft
feet288.3 Continuous Width SF9289.3to $120 $1,1101669219ft
feet -.26293.0 Vertical Change REF9294.0to137246 9 ft
feet294.3 Continuous Width SF9295.3to $120 $1,1101674619ft
feet 4.0-5.0302.3 Cross Slope (PAR)SF180321.8to $120 $21,6451533809ft
feet 3.0-4.0324.2 Cross Slope (PAR)SF15325.8to $120 $1,7761533819ft
feet 2.0-3.0327.3 Cross Slope (PAR)SF106338.8to $120 $12,7651533829ft
feet 3.0-4.0341.3 Cross Slope (PAR)SF18343.2to $120 $2,1091533839ft
feet 2.0-3.0344.4 Cross Slope (PAR)SF115356.8to $120 $13,7641533849ft
feet 4.0-5.0358.5 Cross Slope (PAR)SF141373.7to $120 $16,8721533859ft
feet 2.0-3.0373.7 Cross Slope (PAR)SF325408.8to $120 $38,9611533869ft
feet 2.0-3.0413.1 Cross Slope (PAR)SF76421.3to $120 $9,1021533879ft
feet 3.0-4.0424.0 Cross Slope (PAR)SF30427.2to $120 $3,5521533889ft
feet 2.0-3.0428.3 Cross Slope (PAR)SF31431.7to $120 $3,7741533899ft
feet433.8 Continuous Width SF9434.8to $120 $1,1101673379ft
feet 2.0-3.0436.3 Cross Slope (PAR)SF97446.8to $120 $11,6551533909ft
feet .38441.5 Vertical Change REF9442.5to137247 9 ft
feet 2.0-3.0449.5 Cross Slope (PAR)SF21451.8to $120 $2,5531533919ft
feet 4.0-5.0451.8 Cross Slope (PAR)SF171470.3to $120 $20,5351533929ft
feet .36454.1 Vertical Change REF9455.1to137248 9 ft
feet462.3 Continuous Width SF9463.3to $120 $1,1101671679ft
$408,202.50TOTAL COST FOR:ALCOA AVEWside of Starting at:E 44TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
410
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 46TH ST
Survey Street Name Starting Street Name
LEONIS BLVD
End Street Name
1912201152
Run ID
Alcoa Ave
68
ID Sidewalk Width
Priority
feet 3.0-4.01.3 Cross Slope (PAR)SF538.8to $120 $6,3001474577ft
feet 2.0-3.08.8 Cross Slope (PAR)SF1010.3to $120 $1,2601474587ft
feet 2.0-3.014.5 Cross Slope (PAR)SF2518.1to $120 $3,0241474597ft
feet -.2718.5 Vertical Change LF719.5to $75 $5251357217ft
feet18.5 Driveway41.0to165117
feet 2.0-3.042.5 Cross Slope (PAR)SF2045.3to $120 $2,3521474607ft
feet 2.0-3.047.8 Cross Slope (PAR)SF3853.2to $120 $4,5361474617ft
feet 2.0-3.056.2 Cross Slope (PAR)SF2259.3to $120 $2,6041474627ft
feet72.7 Driveway95.3to165118
feet .2874.8 Vertical Change REF775.8to135722 7 ft
feet 3.0-4.0100.0 Cross Slope (PAR)SF34104.8to $120 $4,0321474637ft
feet 2.0-3.0104.8 Cross Slope (PAR)SF12106.5to $120 $1,4281474647ft
feet 2.0-3.0108.7 Cross Slope (PAR)SF22111.8to $120 $2,6041474657ft
feet -.34119.7 Vertical Change REF7120.7to135723 7 ft
feet 2.0-3.0120.4 Cross Slope (PAR)SF139140.3to $120 $16,7161474667ft
feet .27122.0 Vertical Change REF7123.0to135724 7 ft
feet 3.0-4.0142.8 Cross Slope (PAR)SF35147.8to $120 $4,2001474677ft
feet 2.0-3.0148.1 Cross Slope (PAR)SF31152.5to $120 $3,6961474687ft
feet153.3 Driveway176.1to165119
feet .36156.0 Vertical Change REF7157.0to135725 7 ft
feet 2.0-3.0177.4 Cross Slope (PAR)SF69187.3to $120 $8,3161474697ft
feet 4.0-5.0187.3 Cross Slope (PAR)SF20190.1to $120 $2,3521474707ft
feet 3.0-4.0194.1 Cross Slope (PAR)SF64203.3to $120 $7,7281474717ft
feet 2.0-3.0203.3 Cross Slope (PAR)SF14205.3to $120 $1,6801474727ft
feet206.3 Driveway229.8to165120
feet 3.0-4.0230.2 Cross Slope (Driveway)SF41236.0to $40 $1,6241474737ft
feet 5.0-6.0236.0 Cross Slope (PAR)SF11237.6to $120 $1,3441474747ft
feet 6.0-7.0237.6 Cross Slope (PAR)SF15239.8to $120 $1,8481474757ft
feet 5.0-6.0239.8 Cross Slope (PAR)SF31244.2to $120 $3,6961474767ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
411
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 46TH ST
Survey Street Name Starting Street Name
LEONIS BLVD
End Street Name
1912201152
Run ID
Alcoa Ave
68
ID Sidewalk Width
Priority
feet 6.0-7.0244.7 Cross Slope (PAR)SF14246.7to $120 $1,6801474777ft
feet245.0 Continuous Width REF7246.0to167336 7 ft
feet 5.0-6.0248.9 Cross Slope (PAR)SF50256.0to $120 $5,9641474787ft
feet .3252.1 Vertical Change REF7253.1to135726 7 ft
feet 3.0-4.0256.0 Cross Slope (PAR)SF128274.3to $120 $15,3721474797ft
feet 5.0-6.0275.6 Cross Slope (PAR)SF29279.7to $120 $3,4441474807ft
feet286.6 Driveway313.3to165121
feet 3.0-4.0313.7 Cross Slope (PAR)SF9315.0to $120 $1,0921474817ft
feet 2.0-3.0315.0 Cross Slope (PAR)SF78326.1to $120 $9,3241474827ft
feet 2.0-3.0329.9 Cross Slope (PAR)SF13331.8to $120 $1,5961474837ft
feet 2.0-3.0336.8 Cross Slope (PAR)SF34341.6to $120 $4,0321474847ft
feet 3.23339.3 Vertical Change REF7340.3to135727 7 ft
feet 5.0-6.0342.1 Cross Slope (PAR)SF20345.0to $120 $2,4361474857ft
feet 3.0-4.0346.1 Cross Slope (PAR)SF106361.3to $120 $12,7681474867ft
feet .3358.2 Vertical Change REF7359.2to135728 7 ft
feet 2.0-3.0361.8 Cross Slope (PAR)SF35366.8to $120 $4,2001474877ft
feet 2.0-3.0373.6 Cross Slope (PAR)SF23376.9to $120 $2,7721474887ft
feet 2.0-3.0389.2 Cross Slope (PAR)SF16391.5to $120 $1,9321474897ft
feet 4.0-5.0392.2 Cross Slope (PAR)SF74402.7to $120 $8,8201474907ft
feet -.35399.2 Vertical Change REF7400.2to135729 7 ft
feet .35401.4 Vertical Change REF7402.4to135730 7 ft
feet 3.0-4.0405.1 Cross Slope (PAR)SF8406.2to $120 $9241474917ft
feet 2.0-3.0409.4 Cross Slope (PAR)SF10410.8to $120 $1,1761474927ft
feet 4.0-5.0414.4 Cross Slope (PAR)SF28418.4to $120 $3,3601474937ft
feet 6.0-7.0419.4 Cross Slope (PAR)SF14421.4to $120 $1,6801474947ft
feet 5.0-6.0421.4 Cross Slope (PAR)SF35426.4to $120 $4,2001474957ft
feet 3.0-4.0426.4 Cross Slope (PAR)SF62435.2to $120 $7,3921474967ft
feet 5.0-6.0435.2 Cross Slope (PAR)SF25438.8to $120 $3,0241474977ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
412
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 46TH ST
Survey Street Name Starting Street Name
LEONIS BLVD
End Street Name
1912201152
Run ID
Alcoa Ave
68
ID Sidewalk Width
Priority
feet 3.0-4.0438.8 Cross Slope (PAR)SF17441.2to $120 $2,0161474987ft
feet 4.0-5.0443.9 Cross Slope (PAR)SF52451.3to $120 $6,2161474997ft
feet .29452.3 Vertical Change REF7453.3to135731 7 ft
feet 2.0-3.0453.0 Cross Slope (PAR)SF14455.0to $120 $1,6801475007ft
feet 2.0-3.0474.3 Cross Slope (PAR)SF11475.8to $120 $1,2601475017ft
feet 4.0-5.0476.7 Cross Slope (PAR)SF82488.4to $120 $9,8281475027ft
feet 2.0-3.0488.9 Cross Slope (PAR)SF8490.0to $120 $9241475037ft
feet 3.0-4.0493.0 Cross Slope (PAR)SF47499.7to $120 $5,6281475047ft
feet 2.0-3.0500.0 Cross Slope (PAR)SF17502.4to $120 $2,0161475057ft
$208,621.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E 46TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
413
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 46TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001141514
Run ID
Alcoa Ave
74.25
ID Sidewalk Width
Priority
feet 6.0-7.01.8 Cross Slope (PAR)SF102.9to $120 $1,2211533259ft
feet 5.0-6.02.9 Cross Slope (PAR)SF235.4to $120 $2,7751533269ft
feet 6.0-7.06.2 Cross Slope (PAR)SF269.0to $120 $3,1081533279ft
feet 4.0-5.012.4 Cross Slope (PAR)SF4116.8to $120 $4,8841533289ft
feet 3.0-4.021.4 Cross Slope (PAR)SF1923.5to $120 $2,3311533299ft
feet 3.0-4.028.8 Cross Slope (PAR)SF1029.9to $120 $1,2211533309ft
feet 2.0-3.032.2 Cross Slope (PAR)SF1934.3to $120 $2,3311533319ft
feet 3.0-4.041.0 Cross Slope (PAR)SF1142.2to $120 $1,3321533329ft
feet 2.0-3.043.8 Cross Slope (PAR)SF7551.9to $120 $8,9911533339ft
feet 4.0-5.054.6 Cross Slope (PAR)SF4859.8to $120 $5,7721533349ft
feet 4.0-5.071.0 Cross Slope (PAR)SF7979.5to $120 $9,4351533359ft
feet 2.0-3.080.2 Cross Slope (PAR)SF4084.5to $120 $4,7731533369ft
feet 4.0-5.084.9 Cross Slope (PAR)SF309118.3to $120 $37,0741533379ft
feet 3.0-4.0121.1 Cross Slope (PAR)SF20123.3to $120 $2,4421533389ft
feet 2.0-3.0137.5 Cross Slope (PAR)SF21139.8to $120 $2,5531533399ft
feet 4.0-5.0139.9 Cross Slope (PAR)SF32143.4to $120 $3,8851533409ft
feet 2.0-3.0143.6 Cross Slope (PAR)SF34147.3to $120 $4,1071533419ft
feet 2.0-3.0149.6 Cross Slope (PAR)SF46154.6to $120 $5,5501533429ft
feet 3.0-4.0158.6 Cross Slope (PAR)SF105169.9to $120 $12,5431533439ft
feet 2.0-3.0170.5 Cross Slope (PAR)SF16172.2to $120 $1,8871533449ft
feet 4.0-5.0173.1 Cross Slope (PAR)SF11174.3to $120 $1,3321533459ft
feet175.1 Driveway226.3to165612
feet175.1 Driveway349.6to165613
feet 5.0-6.0226.9 Cross Slope (Driveway)SF55232.8to $40 $2,1831533469ft
feet 3.0-4.0233.8 Cross Slope (Driveway)SF38237.9to $40 $1,5171533479ft
feet 3.0-4.0240.7 Cross Slope (Driveway)SF49246.0to $40 $1,9611533489ft
feet 5.0-6.0247.8 Cross Slope (Driveway)SF19249.9to $40 $7771533499ft
feet 3.0-4.0251.8 Cross Slope (Driveway)SF82260.7to $40 $3,2931533509ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
414
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 46TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001141514
Run ID
Alcoa Ave
74.25
ID Sidewalk Width
Priority
feet259.8 Continuous Width SF9260.8to $120 $1,1101674229ft
feet 4.0-5.0265.3 Cross Slope (Driveway)SF15266.9to $40 $5921533519ft
feet 7.0-8.0268.2 Cross Slope (Driveway)SF22270.6to $40 $8881533529ft
feet 4.0-5.0275.6 Cross Slope (Driveway)SF56281.6to $40 $2,2201533539ft
feet 3.0-4.0284.0 Cross Slope (Driveway)SF240309.9to $40 $9,5831533549ft
feet 2.0-3.0310.1 Cross Slope (Driveway)SF56316.1to $40 $2,2201533559ft
feet 3.0-4.0320.0 Cross Slope (Driveway)SF249346.9to $40 $9,9531533569ft
feet 2.0-3.0347.8 Cross Slope (Driveway)SF17349.6to $40 $6661533579ft
feet 5.0-6.0347.8 Running Slope REF13349.2to166488 9 ft
feet -.26348.4 Vertical Change REF9349.4to137239 9 ft
$156,510.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E 46TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
415
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E 50TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912200952
Run ID
Alcoa Ave
66
ID Sidewalk Width
Priority
feet2.3 Continuous Width SF53.3to $120 $5701674095ft
feet 2.0-3.05.4 Cross Slope (PAR)SF19446.3to $120 $23,3131479485ft
feet22.6 Continuous Width REF523.6to167214 5 ft
feet -.335.4 Vertical Change REF536.4to135855 5 ft
feet 4.0-5.046.3 Cross Slope (PAR)SF4154.9to $120 $4,9021479495ft
feet 2.0-3.054.9 Cross Slope (PAR)SF9274.3to $120 $11,0581479505ft
feet57.9 Continuous Width REF558.9to167715 5 ft
feet 2.0-3.076.9 Cross Slope (PAR)SF2882.8to $120 $3,3631479515ft
feet 4.0-5.082.8 Cross Slope (PAR)SF86101.0to $120 $10,3741479525ft
feet96.7 Continuous Width REF597.7to167282 5 ft
feet100.1 Continuous Width SF5101.1to $120 $5701675935ft
feet 2.0-3.0101.0 Cross Slope (PAR)SF8102.6to $120 $9121479535ft
feet112.8 Cold Patch 43121.8to140329 5 ft
feet121.8 Driveway148.4to165170
feet -.43134.3 Vertical Change REF5135.3to135856 5 ft
feet 4.0-5.0148.8 Cross Slope (PAR)SF20153.1to $120 $2,4511479545ft
feet 2.0-3.0153.8 Cross Slope (PAR)SF5154.9to $120 $6271479555ft
feet 2.0-3.0159.8 Cross Slope (PAR)SF8161.5to $120 $9691479565ft
feet 2.0-3.0175.3 Cross Slope (PAR)SF20179.5to $120 $2,3941479575ft
feet 2.0-3.0182.5 Cross Slope (PAR)SF29188.5to $120 $3,4201479585ft
feet 2.0-3.0191.3 Cross Slope (PAR)SF14194.3to $120 $1,7101479595ft
feet194.3 Driveway232.4to165171
feet -.28226.7 Vertical Change REF5227.7to135857 5 ft
feet 2.0-3.0235.3 Cross Slope (PAR)SF41244.0to $120 $4,9591479605ft
feet 2.0-3.0248.3 Cross Slope (PAR)SF150279.8to $120 $17,9551479615ft
feet 4.0-5.0279.8 Cross Slope (PAR)SF16283.1to $120 $1,8811479625ft
feet 2.0-3.0283.1 Cross Slope (PAR)SF68297.4to $120 $8,1511479635ft
feet 2.0-3.0303.6 Cross Slope (PAR)SF56315.4to $120 $6,7261479645ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
416
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E 50TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912200952
Run ID
Alcoa Ave
66
ID Sidewalk Width
Priority
feet .29306.8 Vertical Change REF17310.3to135858 5 ft
feet315.8 Driveway368.7to165172
feet -.29316.1 Vertical Change REF5317.1to135859 5 ft
$106,305.00TOTAL COST FOR:ALCOA AVEEside of Starting at:E 50TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
417
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 50TH ST
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912161215
Run ID
Alcoa Ave
83.5
ID Sidewalk Width
Priority
feet 3.0-4.00.5 Cross Slope (PAR)SF5212.0to $120 $6,2101522375ft
feet5.8 Continuous Width REF56.8to167270 5 ft
feet 2.0-3.012.0 Cross Slope (PAR)SF1314.9to $120 $1,5661522385ft
feet14.5 Continuous Width SF515.5to $120 $5401678295ft
feet 3.0-4.017.2 Cross Slope (PAR)SF818.9to $120 $9181522395ft
feet -.4620.4 Vertical Change LF521.4to $75 $3381369865ft
feet 3.0-4.022.3 Cross Slope (PAR)SF523.3to $120 $5401522405ft
feet 2.0-3.023.3 Cross Slope (PAR)SF3029.9to $120 $3,5641522415ft
feet 2.0-3.034.4 Cross Slope (PAR)SF1237.0to $120 $1,4041522425ft
feet 4.0-5.037.6 Cross Slope (PAR)SF7854.9to $120 $9,3421522435ft
feet48.7 Continuous Width SF549.7to $120 $5401664105ft
feet 2.0-3.054.9 Cross Slope (PAR)SF3663.0to $120 $4,3741522445ft
feet 2.0-3.070.6 Cross Slope (PAR)SF2375.6to $120 $2,7001522455ft
feet 6.0-7.077.3 Cross Slope (PAR)SF578.3to $120 $5401522465ft
feet 5.0-6.078.3 Cross Slope (PAR)SF579.3to $120 $5401522475ft
feet -.3880.4 Vertical Change REF581.4to136987 5 ft
feet 3.0-4.080.8 Cross Slope (PAR)SF582.0to $120 $6481522485ft
feet 2.0-3.082.0 Cross Slope (PAR)SF783.5to $120 $8101522495ft
feet 2.0-3.088.7 Cross Slope (PAR)SF90108.7to $120 $10,8001522505ft
feet88.8 Continuous Width SF589.8to $120 $5401678315ft
feet105.9 Continuous Width SF5106.9to $120 $5401672695ft
feet114.7 Continuous Width SF5115.7to $120 $5401678305ft
feet 2.0-3.0130.3 Cross Slope (PAR)SF303197.6to $120 $36,3421522515ft
feet -.76179.8 Vertical Change SF5180.8to $75 $3381369885ft
feet .37191.0 Vertical Change REF5192.0to136989 5 ft
feet 2.0-3.0200.9 Cross Slope (PAR)SF30207.6to $120 $3,6181522525ft
feet201.4 Continuous Width SF5202.4to $120 $5401669685ft
feet 2.0-3.0219.2 Cross Slope (PAR)SF19223.4to $120 $2,2681522535ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
418
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 50TH ST
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912161215
Run ID
Alcoa Ave
83.5
ID Sidewalk Width
Priority
feet .3220.1 Vertical Change REF5221.1to136990 5 ft
feet 2.0-3.0226.0 Cross Slope (PAR)SF31232.8to $120 $3,6721522545ft
feet 5.0-6.0233.5 Cross Slope (PAR)SF5234.6to $120 $5941522555ft
feet -.27235.2 Vertical Change LF5236.2to $75 $3381369915ft
feet 3.0-4.0237.3 Cross Slope (PAR)SF39246.0to $120 $4,6981522565ft
feet -.32241.7 Vertical Change REF16245.3to136992 5 ft
feet .27247.2 Vertical Change LF5248.2to $75 $3381369935ft
feet247.3 Cold Patch 41256.3to140470 5 ft
feet257.4 Driveway274.7to165544
feet -.34258.1 Vertical Change REF5259.1to136994 5 ft
feet .28271.1 Vertical Change REF5272.1to136995 5 ft
feet 2.0-3.0276.2 Cross Slope (PAR)SF85295.0to $120 $10,1521522575ft
feet 2.0-3.0297.3 Cross Slope (PAR)SF12300.0to $120 $1,4581522585ft
feet 4.0-5.0300.4 Cross Slope (PAR)SF16304.0to $120 $1,9441522595ft
feet .38300.5 Vertical Change REF5301.5to136996 5 ft
feet -.3303.8 Vertical Change REF5304.8to136997 5 ft
feet 2.0-3.0305.0 Cross Slope (PAR)SF32312.1to $120 $3,8341522605ft
feet -.78308.9 Vertical Change REF5309.9to136998 5 ft
feet319.3 Continuous Width SF5320.3to $120 $5401678325ft
feet 2.0-3.0320.7 Cross Slope (PAR)SF22325.5to $120 $2,5921522615ft
feet .26321.6 Vertical Change REF5322.6to136999 5 ft
feet 3.0-4.0330.2 Cross Slope (PAR)SF36338.3to $120 $4,3741522625ft
feet 2.0-3.0339.4 Cross Slope (PAR)SF42348.8to $120 $5,0761522635ft
feet 4.0-5.0348.9 Cross Slope (PAR)SF26354.7to $120 $3,1321522645ft
feet 2.0-3.0354.7 Cross Slope (PAR)SF7356.3to $120 $8641522655ft
feet 2.0-3.0358.5 Cross Slope (PAR)SF6359.8to $120 $7021522665ft
feet -.27359.4 Vertical Change REF5360.4to137000 5 ft
feet 2.0-3.0362.6 Cross Slope (PAR)SF73378.8to $120 $8,7481522675ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
419
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E 50TH ST
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912161215
Run ID
Alcoa Ave
83.5
ID Sidewalk Width
Priority
feet370.4 Continuous Width SF5371.4to $120 $5401673445ft
feet 4.0-5.0378.8 Cross Slope (PAR)SF191421.3to $120 $22,9501522685ft
feet -.28393.8 Vertical Change REF5394.8to137001 5 ft
feet 2.0-3.0421.3 Cross Slope (PAR)SF118447.5to $120 $14,1481522695ft
feet435.8 Continuous Width SF5436.8to $120 $5401678335ft
feet .26442.2 Vertical Change REF5443.2to137002 5 ft
feet -.29446.0 Vertical Change REF5447.0to137003 5 ft
feet 4.0-5.0447.5 Cross Slope (PAR)SF104470.5to $120 $12,4201522705ft
feet -.28458.9 Vertical Change LF5459.9to $75 $3381370045ft
feet459.3 Continuous Width REF5460.3to166969 5 ft
feet .26461.9 Vertical Change REF5462.9to137005 5 ft
feet 3.0-4.0473.1 Cross Slope (PAR)SF23478.2to $120 $2,7541522715ft
feet 4.0-5.0480.3 Cross Slope (PAR)SF26486.0to $120 $3,0781522725ft
feet 2.0-3.0490.1 Cross Slope (PAR)SF5491.3to $120 $6481522735ft
feet 3.0-4.0494.6 Cross Slope (PAR)SF13497.4to $120 $1,5121522745ft
feet499.4 Continuous Width REF5500.4to167834 5 ft
feet502.3 Continuous Width SF5503.3to $120 $5401669945ft
feet -.31503.3 Vertical Change LF5504.3to $75 $3381370065ft
$202,959.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E 50TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
420
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912121524
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet 6.0-7.00.0 Cross Slope (PAR)SF81.0to $120 $9601457988ft
feet 5.0-6.01.0 Cross Slope (PAR)SF568.0to $120 $6,7201457998ft
feet 6.0-7.08.0 Cross Slope (PAR)SF3612.5to $120 $4,3201458008ft
feet 5.0-6.012.5 Cross Slope (PAR)SF23842.3to $120 $28,6081458018ft
feet .3223.2 Vertical Change REF824.2to134936 8 ft
feet 3.0-4.042.3 Cross Slope (PAR)SF1644.3to $120 $1,9201458028ft
feet 2.0-3.044.3 Cross Slope (PAR)SF9055.6to $120 $10,8481458038ft
feet 4.0-5.055.8 Cross Slope (PAR)SF27189.7to $120 $32,5441458048ft
feet .6691.2 Vertical Change SF892.2to $75 $6001349388ft
feet 4.0-5.093.2 Cross Slope (PAR)SF117107.8to $120 $14,0161458058ft
feet109.5 Driveway154.2to164971
feet .27153.6 Vertical Change REF8154.6to134940 8 ft
feet 4.0-5.0155.4 Cross Slope (PAR)SF245186.0to $120 $29,3761458068ft
feet 3.0-4.0188.1 Cross Slope (PAR)SF332229.6to $120 $39,8401458078ft
feet -.29190.8 Vertical Change REF8191.8to134941 8 ft
feet229.6 Driveway281.8to164972
feet -.28263.9 Vertical Change REF8264.9to134942 8 ft
feet 2.0-3.0285.1 Cross Slope (PAR)SF102297.8to $120 $12,1921458088ft
feet 2.0-3.0314.7 Cross Slope (PAR)SF19317.1to $120 $2,3041458098ft
feet .91318.0 Vertical Change SF8319.0to $75 $6001349438ft
feet 2.0-3.0330.7 Cross Slope (PAR)SF97342.8to $120 $11,6161458108ft
feet344.1 Driveway380.2to164973
feet 3.0-4.0381.0 Cross Slope (PAR)SF26384.3to $120 $3,1681458118ft
feet 2.0-3.0384.3 Cross Slope (PAR)SF56391.3to $120 $6,7201458128ft
feet 2.0-3.0394.7 Cross Slope (PAR)SF11396.1to $120 $1,3441458138ft
feet 2.0-3.0412.3 Cross Slope (PAR)SF12413.8to $120 $1,4401458148ft
feet 2.0-3.0417.5 Cross Slope (PAR)SF14419.2to $120 $1,6321458158ft
feet .37424.0 Vertical Change LF8425.0to $75 $6001349448ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
421
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912121524
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet .3434.1 Vertical Change LF8435.1to $75 $6001349458ft
feet 2.0-3.0443.8 Cross Slope (PAR)SF154463.1to $120 $18,5281458168ft
feet .33450.3 Vertical Change REF8451.3to134946 8 ft
feet -.38465.6 Vertical Change REF8466.6to134947 8 ft
feet 2.0-3.0466.0 Cross Slope (PAR)SF103478.9to $120 $12,3841458178ft
feet485.8 Driveway510.9to164974
feet .26489.9 Vertical Change REF8490.9to134948 8 ft
feet -.27494.1 Vertical Change REF8495.1to134949 8 ft
feet 2.0-3.0512.3 Cross Slope (PAR)SF8513.3to $120 $9601458188ft
feet 2.0-3.0520.4 Cross Slope (PAR)SF49526.5to $120 $5,8561458198ft
feet527.8 Driveway562.1to164975
feet .45535.9 Vertical Change REF8536.9to134950 8 ft
feet 3.0-4.0563.2 Cross Slope (PAR)SF14565.0to $120 $1,7281458208ft
feet 2.0-3.0565.0 Cross Slope (PAR)SF66573.3to $120 $7,9681458218ft
feet571.6 Continuous Width SF8572.6to $120 $9601672688ft
feet .26572.4 Vertical Change REF8573.4to134951 8 ft
feet -.31575.1 Vertical Change LF8576.1to $75 $6001349528ft
feet 2.0-3.0576.6 Cross Slope (PAR)SF14578.3to $120 $1,6321458228ft
feet 2.0-3.0581.5 Cross Slope (PAR)SF66589.7to $120 $7,8721458238ft
feet 4.0-5.0590.0 Cross Slope (PAR)SF47595.9to $120 $5,6641458248ft
feet -.44593.9 Vertical Change REF8594.9to134953 8 ft
feet596.2 Continuous Width SF8597.2to $120 $9601678608ft
feet .33596.5 Vertical Change LF8597.5to $75 $6001349548ft
feet 3.0-4.0599.0 Cross Slope (PAR)SF10600.3to $120 $1,2481458258ft
feet 2.0-3.0600.3 Cross Slope (PAR)SF64608.3to $120 $7,6801458268ft
feet 4.0-5.0608.8 Cross Slope (PAR)SF64616.8to $120 $7,6801458278ft
feet616.8 Driveway635.2to164976
feet 4.0-5.0635.2 Cross Slope (Driveway)SF237664.8to $40 $9,4721458288ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
422
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912121524
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet 2.0-3.0664.8 Cross Slope (PAR)SF158684.5to $120 $18,9121458298ft
feet .3666.7 Vertical Change REF8667.7to134955 8 ft
feet671.3 Continuous Width REF8672.3to167172 8 ft
feet .32676.3 Vertical Change REF8677.3to134956 8 ft
feet 3.0-4.0692.3 Cross Slope (PAR)SF87703.2to $120 $10,4641458308ft
feet -.73702.9 Vertical Change REF8703.9to134957 8 ft
feet704.9 Driveway726.8to164433
feet704.9 Driveway834.8to164434
feet .32725.2 Vertical Change REF8726.2to134959 8 ft
feet 4.0-5.0728.2 Cross Slope (Driveway)SF17730.3to $40 $6721458318ft
feet 3.0-4.0732.4 Cross Slope (Driveway)SF129748.5to $40 $5,1521458328ft
feet734.5 Continuous Width SF8735.5to $120 $9601678598ft
feet 3.0-4.0750.6 Cross Slope (Driveway)SF55757.5to $40 $2,2081458338ft
feet 4.0-5.0759.6 Cross Slope (Driveway)SF23762.5to $40 $9281458348ft
feet 2.0-3.0763.9 Cross Slope (Driveway)SF35768.3to $40 $1,4081458358ft
feet768.1 Continuous Width SF8769.1to $120 $9601671248ft
feet 4.0-5.0768.8 Cross Slope (Driveway)SF36773.3to $40 $1,4401458368ft
feet 4.0-5.0775.6 Cross Slope (Driveway)SF15777.5to $40 $6081458378ft
feet 5.0-6.0779.6 Cross Slope (Driveway)SF22782.3to $40 $8641458388ft
feet 6.0-7.0783.1 Cross Slope (Driveway)SF14784.9to $40 $5761458398ft
feet -.4786.3 Vertical Change REF8787.3to134960 8 ft
feet 4.0-5.0788.0 Cross Slope (Driveway)SF8789.0to $40 $3201458408ft
feet 2.7788.7 Vertical Change REF8789.7to134961 8 ft
feet 4.0-5.0791.8 Cross Slope (Driveway)SF54798.5to $40 $2,1441458418ft
feet 5.0-6.0801.8 Cross Slope (Driveway)SF27805.2to $40 $1,0881458428ft
feet805.0 Continuous Width SF8806.0to $120 $9601672808ft
feet .36813.2 Vertical Change REF8814.2to134962 8 ft
feet 3.0-4.0813.5 Cross Slope (Driveway)SF10814.8to $40 $4161458438ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
423
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912121524
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet .44818.3 Vertical Change REF8819.3to134963 8 ft
feet 2.0-3.0819.6 Cross Slope (Driveway)SF14821.3to $40 $5441458448ft
feet .33821.6 Vertical Change REF8822.6to134964 8 ft
feet -.29824.8 Vertical Change REF8825.8to134965 8 ft
feet -.29828.8 Vertical Change REF8829.8to134966 8 ft
feet 5.0-6.0830.2 Cross Slope (Driveway)SF8831.2to $40 $3201458458ft
feet .8832.1 Vertical Change REF8833.1to134967 8 ft
$354,704.00TOTAL COST FOR:ALCOA AVEEside of Starting at:E SLAUSON AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
424
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
ALCOA AVE
End Street Name
1912121305
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet 5.0-6.01.3 Cross Slope (PAR)SF82.4to $120 $9901461378ft
feet 6.0-7.03.1 Cross Slope (PAR)SF144.9to $120 $1,6201461388ft
feet 5.0-6.05.3 Cross Slope (PAR)SF3810.3to $120 $4,5001461398ft
feet 3.0-4.010.8 Cross Slope (PAR)SF12827.9to $120 $15,3901461408ft
feet 2.0-3.029.2 Cross Slope (PAR)SF4935.8to $120 $5,9401461418ft
feet 4.0-5.035.8 Cross Slope (PAR)SF3240.0to $120 $3,7801461428ft
feet 2.0-3.040.0 Cross Slope (PAR)SF6748.9to $120 $8,0101461438ft
feet50.0 Driveway75.4to164995
feet 4.0-5.075.4 Cross Slope (Driveway)SF1978.0to $40 $7801461448ft
feet 2.0-3.078.0 Cross Slope (PAR)SF9290.3to $120 $11,0701461458ft
feet 2.0-3.092.9 Cross Slope (PAR)SF4799.2to $120 $5,6701461468ft
feet 3.0-4.0101.3 Cross Slope (PAR)SF105115.3to $120 $12,6001461478ft
feet 2.0-3.0115.3 Cross Slope (PAR)SF11116.8to $120 $1,3501461488ft
feet118.2 Driveway171.3to164996
feet 3.16131.2 Vertical Change REF8132.2to135233 8 ft
feet -.29152.1 Vertical Change REF8153.1to135234 8 ft
feet 2.0-3.0173.6 Cross Slope (PAR)SF59181.4to $120 $7,0201461498ft
feet 3.0-4.0183.7 Cross Slope (PAR)SF29187.6to $120 $3,5101461508ft
feet 2.0-3.0187.6 Cross Slope (PAR)SF312229.2to $120 $37,4401461518ft
feet 4.0-5.0230.1 Cross Slope (PAR)SF109244.6to $120 $13,0501461528ft
feet244.6 Driveway296.6to164997
feet 3.0-4.0298.0 Cross Slope (PAR)SF74307.8to $120 $8,8201461538ft
feet .31304.4 Vertical Change REF8305.4to135235 8 ft
feet 3.0-4.0310.8 Cross Slope (PAR)SF23313.9to $120 $2,7901461548ft
feet .5311.5 Vertical Change REF8312.5to135236 8 ft
feet 2.0-3.0314.4 Cross Slope (PAR)SF45320.4to $120 $5,4001461558ft
feet 4.0-5.0320.8 Cross Slope (PAR)SF370370.1to $120 $44,3701461568ft
feet 2.0-3.0370.1 Cross Slope (PAR)SF74379.9to $120 $8,8201461578ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
425
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
ALCOA AVE
End Street Name
1912121305
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet 3.0-4.0382.5 Cross Slope (PAR)SF17384.8to $120 $2,0701461588ft
feet .26383.9 Vertical Change REF8384.9to135238 8 ft
feet 4.0-5.0387.3 Cross Slope (PAR)SF19389.8to $120 $2,2501461598ft
feet 2.0-3.0390.1 Cross Slope (PAR)SF44395.9to $120 $5,2201461608ft
feet 2.0-3.0400.4 Cross Slope (PAR)SF38405.5to $120 $4,5901461618ft
feet 3.0-4.0407.7 Cross Slope (PAR)SF26411.2to $120 $3,1501461628ft
feet 2.0-3.0411.2 Cross Slope (PAR)SF148430.9to $120 $17,7301461638ft
feet 4.0-5.0432.9 Cross Slope (PAR)SF329476.7to $120 $39,4201461648ft
feet 2.0-3.0476.7 Cross Slope (PAR)SF104490.5to $120 $12,4201461658ft
feet 4.0-5.0490.5 Cross Slope (PAR)SF121506.6to $120 $14,4901461668ft
feet 3.48502.0 Vertical Change REF8503.0to135239 8 ft
feet 2.0-3.0507.1 Cross Slope (PAR)SF133524.8to $120 $15,9301461678ft
feet 4.0-5.0524.8 Cross Slope (PAR)SF72534.4to $120 $8,6401461688ft
feet 2.0-3.0535.4 Cross Slope (PAR)SF78545.8to $120 $9,3601461698ft
feet 4.0-5.0545.8 Cross Slope (PAR)SF26549.2to $120 $3,0601461708ft
feet 2.0-3.0549.7 Cross Slope (PAR)SF52556.6to $120 $6,2101461718ft
feet 4.0-5.0556.6 Cross Slope (PAR)SF58564.3to $120 $6,9301461728ft
feet 5.0-6.0566.9 Cross Slope (PAR)SF10568.3to $120 $1,2601461738ft
feet 3.0-4.0571.3 Cross Slope (PAR)SF126588.1to $120 $15,1201461748ft
feet 2.67575.2 Vertical Change REF8576.2to135240 8 ft
feet .37584.4 Vertical Change REF8585.4to135241 8 ft
feet588.1 Driveway611.8to164998
feet -.37598.3 Vertical Change REF8599.3to135242 8 ft
feet 2.0-3.0613.8 Cross Slope (PAR)SF68622.9to $120 $8,1901461758ft
feet628.1 Driveway647.1to164999
feet 5.0-6.0648.8 Cross Slope (PAR)SF50655.4to $120 $5,9401461768ft
feet -.37654.0 Vertical Change REF8655.0to135243 8 ft
feet 3.0-4.0655.4 Cross Slope (PAR)SF11656.8to $120 $1,2601461778ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
426
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
ALCOA AVE
End Street Name
1912121305
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet 2.0-3.0656.8 Cross Slope (PAR)SF8657.8to $120 $9001461788ft
feet 2.0-3.0664.5 Cross Slope (PAR)SF33668.9to $120 $3,9601461798ft
feet 4.0-5.0668.9 Cross Slope (PAR)SF50675.6to $120 $6,0301461808ft
feet 2.0-3.0675.9 Cross Slope (PAR)SF234707.1to $120 $28,0801461818ft
feet 4.0-5.0707.1 Cross Slope (PAR)SF96719.9to $120 $11,5201461828ft
feet 2.0-3.0719.9 Cross Slope (PAR)SF176743.4to $120 $21,1501461838ft
feet 2.0-3.0746.8 Cross Slope (PAR)SF237778.4to $120 $28,4401461848ft
feet 2.0-3.0780.9 Cross Slope (PAR)SF14782.8to $120 $1,7101461858ft
feet 3.0-4.0786.5 Cross Slope (PAR)SF32790.8to $120 $3,8701461868ft
feet 2.0-3.0791.8 Cross Slope (PAR)SF118807.5to $120 $14,1301461878ft
feet 4.0-5.0807.5 Cross Slope (PAR)SF53814.6to $120 $6,3901461888ft
feet 4.0-5.0818.7 Cross Slope (PAR)SF143837.8to $120 $17,1901461898ft
feet 4.0-5.0840.5 Cross Slope (PAR)SF80851.1to $120 $9,5401461908ft
feet -.38851.8 Vertical Change LF8852.8to $75 $5631352448ft
feet 2.0-3.0853.3 Cross Slope (PAR)SF36858.1to $120 $4,3201461918ft
feet 4.0-5.0858.6 Cross Slope (PAR)SF60866.6to $120 $7,2001461928ft
feet -.4865.4 Vertical Change REF8866.4to135245 8 ft
feet 2.0-3.0868.7 Cross Slope (PAR)SF16870.8to $120 $1,8901461938ft
feet 2.0-3.0875.3 Cross Slope (PAR)SF67884.2to $120 $8,0101461948ft
feet 4.0-5.0884.3 Cross Slope (PAR)SF110899.0to $120 $13,2301461958ft
feet 2.0-3.0899.4 Cross Slope (PAR)SF153919.8to $120 $18,3601461968ft
feet 4.0-5.0919.8 Cross Slope (PAR)SF26923.3to $120 $3,1501461978ft
feet 3.0-4.0926.8 Cross Slope (PAR)SF54934.0to $120 $6,4801461988ft
feet 2.0-3.0934.0 Cross Slope (PAR)SF40939.3to $120 $4,7701461998ft
feet 3.0-4.0941.8 Cross Slope (PAR)SF10943.1to $120 $1,1701462008ft
feet 2.0-3.0943.1 Cross Slope (PAR)SF22946.0to $120 $2,6101462018ft
feet 2.0-3.0949.8 Cross Slope (PAR)SF185974.5to $120 $22,2301462028ft
feet 4.0-5.0975.2 Cross Slope (PAR)SF20977.8to $120 $2,3401462038ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
427
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E SLAUSON AVE
Survey Street Name Starting Street Name
ALCOA AVE
End Street Name
1912121305
Run ID
Alcoa Ave
94
ID Sidewalk Width
Priority
feet 2.0-3.0978.1 Cross Slope (PAR)SF35982.7to $120 $4,1401462048ft
$639,532.50TOTAL COST FOR:ALCOA AVEWside of Starting at:E SLAUSON AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
428
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
E VERNON AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001141655
Run ID
Alcoa Ave
33.25
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF364.8to $120 $4,3201528858ft
feet 3.0-4.07.7 Cross Slope (PAR)SF14026.3to $120 $16,7401528868ft
feet 2.0-3.026.8 Cross Slope (PAR)SF2630.2to $120 $3,0601528878ft
feet 4.0-5.030.2 Cross Slope (PAR)SF831.2to $120 $9001528888ft
feet 4.0-5.034.3 Cross Slope (PAR)SF2036.9to $120 $2,3401528898ft
feet 2.0-3.037.8 Cross Slope (PAR)SF1139.3to $120 $1,3501528908ft
feet 2.0-3.043.7 Cross Slope (PAR)SF844.8to $120 $9901528918ft
feet 2.0-3.047.6 Cross Slope (PAR)SF1850.0to $120 $2,1601528928ft
feet 2.0-3.052.3 Cross Slope (PAR)SF2054.9to $120 $2,3401528938ft
feet 2.0-3.059.3 Cross Slope (PAR)SF3864.4to $120 $4,5901528948ft
feet 2.0-3.077.9 Cross Slope (PAR)SF4283.5to $120 $5,0401528958ft
feet 2.0-3.089.4 Cross Slope (PAR)SF2993.3to $120 $3,5101528968ft
feet 2.0-3.0102.4 Cross Slope (PAR)SF67111.3to $120 $8,0101528978ft
feet 3.0-4.0113.7 Cross Slope (PAR)SF53120.8to $120 $6,3901528988ft
feet 2.0-3.0121.6 Cross Slope (PAR)SF43127.3to $120 $5,1301528998ft
feet 2.0-3.0129.7 Cross Slope (PAR)SF18132.1to $120 $2,1601529008ft
feet 2.0-3.0134.4 Cross Slope (PAR)SF395187.0to $120 $47,3401529018ft
feet 2.0-3.0195.2 Cross Slope (PAR)SF41200.7to $120 $4,9501529028ft
feet 7.0-8.0198.8 Running Slope REF8199.8to166486 8 ft
$121,320.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E VERNON AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
429
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
E 50TH ST
End Street Name
1912161227
Run ID
Alcoa Ave
91
ID Sidewalk Width
Priority
feet 2.0-3.01.3 Cross Slope (PAR)SF62.6to $120 $7021521945ft
feet 5.0-6.04.1 Cross Slope (PAR)SF7520.8to $120 $9,0181521955ft
feet 3.0-4.020.8 Cross Slope (PAR)SF2927.3to $120 $3,5101521965ft
feet 5.0-6.027.3 Cross Slope (PAR)SF2933.8to $120 $3,5101521975ft
feet -.2828.6 Vertical Change REF529.6to136967 5 ft
feet -.2632.9 Vertical Change REF533.9to136968 5 ft
feet 6.0-7.033.8 Cross Slope (PAR)SF3441.4to $120 $4,1041521985ft
feet .2637.2 Vertical Change REF538.2to136969 5 ft
feet -.2641.5 Vertical Change REF542.5to136970 5 ft
feet 5.0-6.042.3 Cross Slope (PAR)SF5454.3to $120 $6,4801521995ft
feet 6.0-7.054.3 Cross Slope (PAR)SF3562.1to $120 $4,2121522005ft
feet59.1 Continuous Width SF560.1to $120 $5401671275ft
feet 5.0-6.062.1 Cross Slope (PAR)SF563.3to $120 $6481522015ft
feet62.9 Continuous Width SF563.9to $120 $5401674175ft
feet 2.0-3.064.8 Cross Slope (PAR)SF565.9to $120 $5941522025ft
feet 4.0-5.067.1 Cross Slope (PAR)SF1971.3to $120 $2,2681522035ft
feet71.8 Driveway114.9to165543
feet .4372.1 Vertical Change REF573.1to136972 5 ft
feet -.3884.9 Vertical Change REF585.9to136973 5 ft
feet -.38114.9 Vertical Change REF5115.9to136974 5 ft
feet 3.0-4.0115.8 Cross Slope (PAR)SF20120.3to $120 $2,4301522045ft
feet 5.0-6.0120.3 Cross Slope (PAR)SF18124.4to $120 $2,2141522055ft
feet 3.0-4.0124.4 Cross Slope (PAR)SF114149.8to $120 $13,7161522065ft
feet127.2 Continuous Width SF4128.2to $120 $5401673965ft
feet 5.0-6.0150.0 Cross Slope (PAR)SF15153.3to $120 $1,7821522075ft
feet 3.0-4.0154.2 Cross Slope (PAR)SF107177.9to $120 $12,7981522085ft
feet163.1 Continuous Width REF5164.1to167228 5 ft
feet 2.0-3.0177.9 Cross Slope (PAR)SF67192.8to $120 $8,0461522095ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
430
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
E 50TH ST
End Street Name
1912161227
Run ID
Alcoa Ave
91
ID Sidewalk Width
Priority
feet185.3 Continuous Width REF5186.3to167725 5 ft
feet 4.0-5.0193.0 Cross Slope (PAR)SF68208.2to $120 $8,2081522105ft
feet 2.0-3.0208.2 Cross Slope (PAR)SF44218.0to $120 $5,2921522115ft
feet .37215.3 Vertical Change REF5216.3to136975 5 ft
feet 5.0-6.0219.3 Cross Slope (PAR)SF7220.8to $120 $8101522125ft
feet 6.0-7.0220.8 Cross Slope (PAR)SF20225.2to $120 $2,3761522135ft
feet .99221.1 Vertical Change REF5222.1to136976 5 ft
feet 5.0-6.0225.3 Cross Slope (PAR)SF28231.5to $120 $3,3481522145ft
feet -.38225.8 Vertical Change REF5226.8to136977 5 ft
feet 3.0-4.0231.5 Cross Slope (PAR)SF8233.2to $120 $9181522155ft
feet231.7 Continuous Width REF5232.7to167285 5 ft
feet 2.0-3.0233.2 Cross Slope (PAR)SF17236.9to $120 $1,9981522165ft
feet239.6 Cold Patch 41248.7to140469 5 ft
feet .32243.6 Vertical Change LF5244.6to $75 $3381369785ft
feet -.33245.9 Vertical Change LF23251.0to $75 $1,7211369795ft
feet 4.0-5.0249.7 Cross Slope (PAR)SF50260.9to $120 $6,0481522175ft
feet255.4 Continuous Width SF4256.4to $120 $5401668055ft
feet 6.0-7.0260.9 Cross Slope (PAR)SF88280.5to $120 $10,5841522185ft
feet .27265.8 Vertical Change REF5266.8to136980 5 ft
feet -.31279.7 Vertical Change REF5280.7to136981 5 ft
feet 5.0-6.0280.5 Cross Slope (PAR)SF40289.3to $120 $4,7521522195ft
feet 3.0-4.0289.3 Cross Slope (PAR)SF112314.2to $120 $13,4461522205ft
feet 5.0-6.0317.0 Cross Slope (PAR)SF24322.4to $120 $2,9161522215ft
feet 3.0-4.0322.4 Cross Slope (PAR)SF18326.5to $120 $2,2141522225ft
feet 5.0-6.0326.5 Cross Slope (PAR)SF74343.0to $120 $8,9101522235ft
feet334.4 Continuous Width SF5335.4to $120 $5401675785ft
feet 3.0-4.0343.0 Cross Slope (PAR)SF72359.1to $120 $8,6941522245ft
feet 2.0-3.0359.1 Cross Slope (PAR)SF17362.8to $120 $1,9981522255ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
431
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
E 50TH ST
End Street Name
1912161227
Run ID
Alcoa Ave
91
ID Sidewalk Width
Priority
feet -.34363.1 Vertical Change LF5364.1to $75 $3381369825ft
feet -.27367.6 Vertical Change REF5368.6to136983 5 ft
feet 4.0-5.0367.8 Cross Slope (PAR)SF187409.3to $120 $22,4101522265ft
feet 6.0-7.0409.3 Cross Slope (PAR)SF10411.5to $120 $1,1881522275ft
feet 5.0-6.0411.5 Cross Slope (PAR)SF103434.3to $120 $12,3121522285ft
feet -.27411.6 Vertical Change REF5412.6to136985 5 ft
feet 6.0-7.0434.3 Cross Slope (PAR)SF18438.3to $120 $2,1601522295ft
feet 5.0-6.0438.3 Cross Slope (PAR)SF66452.9to $120 $7,8841522305ft
feet 3.0-4.0452.9 Cross Slope (PAR)SF51464.3to $120 $6,1561522315ft
feet459.6 Continuous Width REF5460.6to166953 5 ft
feet 5.0-6.0464.3 Cross Slope (PAR)SF17468.1to $120 $2,0521522325ft
feet 3.0-4.0468.1 Cross Slope (PAR)SF16471.7to $120 $1,9441522335ft
feet 5.0-6.0472.2 Cross Slope (PAR)SF29478.7to $120 $3,5101522345ft
feet 3.0-4.0478.7 Cross Slope (PAR)SF19482.9to $120 $2,2681522355ft
feet482.8 Continuous Width SF5483.8to $120 $5401674835ft
feet 4.0-5.0485.7 Cross Slope (PAR)SF65500.1to $120 $7,7761522365ft
feet497.6 Continuous Width SF5498.6to $120 $5401671625ft
$234,380.25TOTAL COST FOR:ALCOA AVEEside of Starting at:FRUITLAND AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
432
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
5563 ALCOA AVE
End Street Name
1912121604
Run ID
Alcoa Ave
81
ID Sidewalk Width
Priority
feet 5.0-6.00.0 Cross Slope (PAR)SF21227.3to $120 $25,3891456468ft
feet -.283.8 Vertical Change REF84.8to134841 8 ft
feet -.5210.8 Vertical Change REF811.8to134842 8 ft
feet -.5217.9 Vertical Change REF818.9to134843 8 ft
feet -.5324.7 Vertical Change REF825.7to134844 8 ft
feet 3.0-4.028.8 Cross Slope (PAR)SF13245.8to $120 $15,8101456478ft
feet -.2636.1 Vertical Change REF837.1to134845 8 ft
feet -.3746.3 Vertical Change REF847.3to134846 8 ft
feet 2.0-3.046.3 Cross Slope (PAR)SF947.4to $120 $1,0231456488ft
feet .2950.7 Vertical Change LF851.7to $75 $5811348478ft
feet 2.0-3.052.3 Cross Slope (PAR)SF2355.3to $120 $2,7901456498ft
feet 4.0-5.055.3 Cross Slope (PAR)SF9467.4to $120 $11,2531456508ft
feet -.5359.4 Vertical Change REF860.4to134848 8 ft
feet 2.0-3.068.2 Cross Slope (PAR)SF5975.8to $120 $7,0681456518ft
feet -.4168.8 Vertical Change REF869.8to134849 8 ft
feet 4.0-5.075.8 Cross Slope (PAR)SF2779.3to $120 $3,2551456528ft
feet -.3378.5 Vertical Change REF879.5to134850 8 ft
feet 2.0-3.090.3 Cross Slope (PAR)SF78100.3to $120 $9,3001456538ft
feet 4.0-5.0101.0 Cross Slope (PAR)SF105114.6to $120 $12,6481456548ft
feet .56109.9 Vertical Change REF8110.9to134851 8 ft
feet 2.0-3.0114.6 Cross Slope (PAR)SF184138.4to $120 $22,1341456558ft
feet -.43124.7 Vertical Change REF8125.7to134852 8 ft
feet -.4136.9 Vertical Change REF8137.9to134853 8 ft
feet 2.0-3.0142.4 Cross Slope (PAR)SF70151.4to $120 $8,3701456568ft
feet -.52143.5 Vertical Change REF8144.5to134854 8 ft
feet .51152.2 Vertical Change SF8153.2to $75 $5811348558ft
feet -.53156.5 Vertical Change SF8157.5to $75 $5811348568ft
feet 2.0-3.0158.1 Cross Slope (PAR)SF90169.7to $120 $10,7881456578ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
433
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
5563 ALCOA AVE
End Street Name
1912121604
Run ID
Alcoa Ave
81
ID Sidewalk Width
Priority
feet 3.0-4.0171.8 Cross Slope (PAR)SF60179.6to $120 $7,2541456588ft
feet 2.0-3.0179.6 Cross Slope (PAR)SF40184.8to $120 $4,8361456598ft
feet .31184.1 Vertical Change REF8185.1to134857 8 ft
feet 2.0-3.0191.2 Cross Slope (PAR)SF86202.3to $120 $10,3231456608ft
feet -.38196.6 Vertical Change REF8197.6to134858 8 ft
feet 2.0-3.0208.0 Cross Slope (PAR)SF60215.7to $120 $7,1611456618ft
feet -.35210.1 Vertical Change REF8211.1to134859 8 ft
feet215.7 Driveway259.3to164949
feet -.32225.7 Vertical Change REF8226.7to134860 8 ft
feet .46247.4 Vertical Change REF8248.4to134861 8 ft
feet 4.0-5.0260.1 Cross Slope (PAR)SF192284.9to $120 $23,0641456628ft
feet -.38266.5 Vertical Change REF8267.5to134862 8 ft
feet286.3 Driveway331.1to164950
feet -.36319.2 Vertical Change REF8320.2to134863 8 ft
feet -.36329.5 Vertical Change REF8330.5to134864 8 ft
feet 3.0-4.0331.1 Cross Slope (Driveway)SF79341.3to $40 $3,1621456638ft
feet .79342.6 Vertical Change REF8343.6to134865 8 ft
feet 5.0-6.0342.8 Cross Slope (PAR)SF10344.1to $120 $1,2091456648ft
feet 7.0-8.0346.5 Cross Slope (PAR)SF13348.2to $120 $1,5811456658ft
feet 2.0-3.0353.5 Cross Slope (PAR)SF379402.4to $120 $45,4771456668ft
feet 4.0-5.0402.4 Cross Slope (PAR)SF33406.7to $120 $3,9991456678ft
feet 2.0-3.0406.7 Cross Slope (PAR)SF239437.5to $120 $28,6441456688ft
feet 2.0-3.0440.8 Cross Slope (PAR)SF53447.6to $120 $6,3241456698ft
feet 4.0-5.0447.6 Cross Slope (PAR)SF447505.3to $120 $53,6611456708ft
feet .31448.4 Vertical Change REF8449.4to134866 8 ft
feet 2.0-3.0505.3 Cross Slope (PAR)SF67513.9to $120 $7,9981456718ft
feet 4.0-5.0514.3 Cross Slope (PAR)SF253546.9to $120 $30,3181456728ft
feet .72539.6 Vertical Change REF8540.6to134867 8 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
434
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
5563 ALCOA AVE
End Street Name
1912121604
Run ID
Alcoa Ave
81
ID Sidewalk Width
Priority
feet 2.0-3.0547.3 Cross Slope (PAR)SF40552.4to $120 $4,7431456738ft
feet 4.0-5.0552.4 Cross Slope (PAR)SF198577.9to $120 $23,7151456748ft
feet580.0 Driveway613.4to164951
feet 2.0-3.0613.8 Cross Slope (PAR)SF89625.3to $120 $10,6951456758ft
feet -.26622.3 Vertical Change REF8623.3to134869 8 ft
feet626.3 Driveway669.4to164952
feet -.39635.8 Vertical Change REF8636.8to134870 8 ft
feet -.26646.6 Vertical Change REF8647.6to134871 8 ft
feet .32657.6 Vertical Change REF8658.6to134872 8 ft
feet 3.0-4.0670.7 Cross Slope (PAR)SF166692.1to $120 $19,9021456768ft
feet .31678.7 Vertical Change REF8679.7to134873 8 ft
feet 2.0-3.0692.1 Cross Slope (PAR)SF133709.3to $120 $15,9961456778ft
feet .39696.9 Vertical Change REF8697.9to134874 8 ft
feet -.7713.5 Vertical Change REF8714.5to134875 8 ft
feet 5.0-6.0714.3 Cross Slope (PAR)SF12715.9to $120 $1,4881456788ft
feet 5.0-6.0718.5 Cross Slope (PAR)SF78728.5to $120 $9,3001456798ft
feet 4.0-5.0732.4 Cross Slope (PAR)SF19734.9to $120 $2,3251456808ft
feet 3.0-4.0737.9 Cross Slope (PAR)SF139755.8to $120 $16,6471456818ft
feet 5.0-6.0755.8 Cross Slope (PAR)SF33760.1to $120 $3,9991456828ft
feet 3.0-4.0760.6 Cross Slope (PAR)SF368808.1to $120 $44,1751456838ft
feet 5.0-6.0808.8 Cross Slope (PAR)SF84819.7to $120 $10,1371456848ft
feet 6.0-7.0820.1 Cross Slope (PAR)SF13821.8to $120 $1,5811456858ft
feet -.31821.4 Vertical Change REF8822.4to134876 8 ft
feet 5.0-6.0821.8 Cross Slope (PAR)SF127838.2to $120 $15,2521456868ft
feet 3.0-4.0838.5 Cross Slope (PAR)SF42843.9to $120 $5,0221456878ft
feet 5.0-6.0845.3 Cross Slope (PAR)SF29849.0to $120 $3,4411456888ft
feet 3.0-4.0849.5 Cross Slope (PAR)SF82860.1to $120 $9,8581456898ft
feet 5.0-6.0860.1 Cross Slope (PAR)SF25863.3to $120 $2,9761456908ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
435
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
5563 ALCOA AVE
End Street Name
1912121604
Run ID
Alcoa Ave
81
ID Sidewalk Width
Priority
feet 3.0-4.0864.8 Cross Slope (PAR)SF74874.3to $120 $8,8351456918ft
feet 5.0-6.0875.4 Cross Slope (PAR)SF187899.5to $120 $22,4131456928ft
feet 4.0-5.0901.8 Cross Slope (PAR)SF47907.8to $120 $5,5801456938ft
feet 2.0-3.0907.8 Cross Slope (PAR)SF115922.6to $120 $13,7641456948ft
feet -.29916.4 Vertical Change REF8917.4to134877 8 ft
feet 4.0-5.0922.6 Cross Slope (PAR)SF270957.5to $120 $32,4571456958ft
feet -.5933.6 Vertical Change REF8934.6to134878 8 ft
feet 2.0-3.0958.1 Cross Slope (PAR)SF140976.2to $120 $16,8331456968ft
feet .27959.1 Vertical Change REF8960.1to134879 8 ft
feet976.2 Driveway1010.1to164953
feet -.34997.7 Vertical Change REF8998.7to134880 8 ft
feet 3.0-4.01011.4 Cross Slope (PAR)SF881022.8to $120 $10,6021456978ft
feet 2.0-3.01022.8 Cross Slope (PAR)SF131024.5to $120 $1,5811456988ft
feet1025.0 Driveway1068.8to164954
feet -.371042.9 Vertical Change REF81043.9to134881 8 ft
feet 4.0-5.01068.8 Cross Slope (Driveway)SF731078.2to $40 $2,9141456998ft
$682,813.75TOTAL COST FOR:ALCOA AVEWside of Starting at:FRUITLAND AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
436
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
LEONIS BLVD
Survey Street Name Starting Street Name
E 46TH ST
End Street Name
1912201215
Run ID
Alcoa Ave
69
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF479.8to $120 $5,5861474195ft
feet4.9 Continuous Width SF55.9to $120 $5701669925ft
feet 2.0-3.09.8 Cross Slope (PAR)SF711.3to $120 $8551474205ft
feet 2.0-3.015.7 Cross Slope (PAR)SF2921.9to $120 $3,5341474215ft
feet -.2924.0 Vertical Change LF525.0to $75 $3561357165ft
feet 2.0-3.030.3 Cross Slope (PAR)SF2234.9to $120 $2,6221474225ft
feet31.2 Continuous Width REF532.2to166937 5 ft
feet43.3 Continuous Width SF544.3to $120 $5701671115ft
feet 2.0-3.043.8 Cross Slope (PAR)SF7459.3to $120 $8,8351474235ft
feet50.7 Continuous Width REF551.7to167294 5 ft
feet52.8 Continuous Width REF553.8to167676 5 ft
feet 2.0-3.061.5 Cross Slope (PAR)SF763.0to $120 $8551474245ft
feet 2.0-3.066.8 Cross Slope (PAR)SF10388.5to $120 $12,3691474255ft
feet 2.0-3.090.8 Cross Slope (PAR)SF1493.8to $120 $1,7101474265ft
feet102.8 Continuous Width SF5103.8to $120 $5701671125ft
feet 3.0-4.0104.4 Cross Slope (PAR)SF28110.3to $120 $3,3631474275ft
feet 2.0-3.0111.5 Cross Slope (PAR)SF22116.1to $120 $2,6221474285ft
feet 2.0-3.0120.3 Cross Slope (PAR)SF59132.7to $120 $7,0681474295ft
feet .32132.5 Vertical Change REF5133.5to135717 5 ft
feet133.3 Driveway161.3to165115
feet 2.0-3.0162.4 Cross Slope (PAR)SF8164.0to $120 $9121474305ft
feet 6.0-7.0169.3 Cross Slope (PAR)SF11171.6to $120 $1,3111474315ft
feet 5.0-6.0171.6 Cross Slope (PAR)SF10173.6to $120 $1,1401474325ft
feet172.3 Continuous Width SF5173.3to $120 $5701674075ft
feet 6.0-7.0173.6 Cross Slope (PAR)SF27179.3to $120 $3,2491474335ft
feet 5.0-6.0180.1 Cross Slope (PAR)SF13182.8to $120 $1,5391474345ft
feet 3.0-4.0182.8 Cross Slope (PAR)SF6184.1to $120 $7411474355ft
feet .29184.2 Vertical Change LF5185.2to $75 $3561357185ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
437
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
LEONIS BLVD
Survey Street Name Starting Street Name
E 46TH ST
End Street Name
1912201215
Run ID
Alcoa Ave
69
ID Sidewalk Width
Priority
feet184.6 Driveway221.9to165116
feet 2.0-3.0222.2 Cross Slope (Driveway)SF14225.2to $40 $5701474365ft
feet 4.0-5.0225.2 Cross Slope (PAR)SF22229.8to $120 $2,6221474375ft
feet 2.0-3.0229.8 Cross Slope (PAR)SF31236.4to $120 $3,7621474385ft
feet230.8 Continuous Width SF5231.8to $120 $5701667945ft
feet 2.0-3.0246.6 Cross Slope (PAR)SF15249.8to $120 $1,8241474395ft
feet 2.0-3.0251.9 Cross Slope (PAR)SF29258.0to $120 $3,4771474405ft
feet 3.0-4.0261.8 Cross Slope (PAR)SF221308.3to $120 $26,5051474415ft
feet298.8 Continuous Width SF5299.8to $120 $5701664125ft
feet 5.0-6.0308.3 Cross Slope (PAR)SF211352.7to $120 $25,3081474425ft
feet313.4 Continuous Width SF5314.4to $120 $5701669085ft
feet330.2 Continuous Width SF5331.2to $120 $5701674365ft
feet332.4 Continuous Width SF5333.4to $120 $5701664145ft
feet 1.19336.3 Vertical Change REF5337.3to135719 5 ft
feet348.8 Continuous Width SF5349.8to $120 $5701664135ft
feet 3.0-4.0352.7 Cross Slope (PAR)SF39360.9to $120 $4,6741474435ft
feet 2.0-3.0362.3 Cross Slope (PAR)SF27367.9to $120 $3,1921474445ft
feet 4.0-5.0367.9 Cross Slope (PAR)SF228415.8to $120 $27,3031474455ft
feet 2.0-3.0415.8 Cross Slope (PAR)SF78432.2to $120 $9,3481474465ft
feet421.8 Continuous Width SF5422.8to $120 $5701667935ft
feet 4.0-5.0432.2 Cross Slope (PAR)SF9434.0to $120 $1,0261474475ft
feet 2.0-3.0436.3 Cross Slope (PAR)SF37444.1to $120 $4,4461474485ft
feet 4.0-5.0444.1 Cross Slope (PAR)SF72459.3to $120 $8,6641474495ft
feet448.3 Continuous Width SF5449.3to $120 $5701664115ft
feet 2.0-3.0460.6 Cross Slope (PAR)SF51471.3to $120 $6,0991474505ft
feet 2.0-3.0478.9 Cross Slope (PAR)SF16482.3to $120 $1,9381474515ft
feet 6.0-7.0485.3 Cross Slope (PAR)SF15488.4to $120 $1,7671474525ft
feet489.3 Continuous Width SF5490.3to $120 $5701673555ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
438
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
LEONIS BLVD
Survey Street Name Starting Street Name
E 46TH ST
End Street Name
1912201215
Run ID
Alcoa Ave
69
ID Sidewalk Width
Priority
feet 5.0-6.0489.9 Cross Slope (PAR)SF20494.1to $120 $2,3941474535ft
feet493.6 Continuous Width REF5494.6to166847 5 ft
feet 3.0-4.0494.1 Cross Slope (PAR)SF11496.5to $120 $1,3681474545ft
feet 2.0-3.0496.8 Cross Slope (PAR)SF6498.0to $120 $6841474555ft
feet .33500.0 Vertical Change LF5501.0to $75 $3561357205ft
feet500.6 Continuous Width SF5501.6to $120 $5701671535ft
feet 2.0-3.0503.4 Cross Slope (PAR)SF47513.3to $120 $5,6431474565ft
$209,973.75TOTAL COST FOR:ALCOA AVEEside of Starting at:LEONIS BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
439
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
LEONIS BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001141526
Run ID
Alcoa Ave
89
ID Sidewalk Width
Priority
feet 5.0-6.05.0 Cross Slope (PAR)SF5316.8to $120 $6,3721532915ft
feet13.0 Continuous Width SF514.0to $120 $5401669935ft
feet 3.0-4.018.2 Cross Slope (PAR)SF819.9to $120 $9181532925ft
feet 5.0-6.021.8 Cross Slope (PAR)SF522.9to $120 $5941532935ft
feet 6.0-7.022.9 Cross Slope (PAR)SF624.2to $120 $7021532945ft
feet 5.0-6.024.2 Cross Slope (PAR)SF2329.2to $120 $2,7001532955ft
feet -.4730.0 Vertical Change LF531.0to $75 $3381372345ft
feet 3.0-4.031.3 Cross Slope (PAR)SF5242.8to $120 $6,2101532965ft
feet37.6 Continuous Width SF538.6to $120 $5401673755ft
feet 4.0-5.045.3 Cross Slope (PAR)SF1348.1to $120 $1,5121532975ft
feet 6.0-7.048.3 Cross Slope (PAR)SF950.2to $120 $1,0261532985ft
feet 5.0-6.050.7 Cross Slope (PAR)SF952.8to $120 $1,1341532995ft
feet 6.0-7.053.4 Cross Slope (PAR)SF1456.6to $120 $1,7281533005ft
feet 5.0-6.056.9 Cross Slope (PAR)SF12283.9to $120 $14,5801533015ft
feet77.6 Continuous Width SF578.6to $120 $5401671665ft
feet 6.0-7.084.3 Cross Slope (PAR)SF886.0to $120 $9181533025ft
feet 185.7 Vertical Change REF586.7to137235 5 ft
feet 5.0-6.086.3 Cross Slope (PAR)SF2792.4to $120 $3,2941533035ft
feet 3.0-4.092.4 Cross Slope (PAR)SF894.1to $120 $9181533045ft
feet 4.0-5.096.3 Cross Slope (PAR)SF91116.5to $120 $10,9081533055ft
feet 2.0-3.0117.8 Cross Slope (PAR)SF36125.8to $120 $4,3201533065ft
feet 4.0-5.0126.3 Cross Slope (PAR)SF9128.2to $120 $1,0261533075ft
feet 4.0-5.0135.3 Cross Slope (PAR)SF16138.8to $120 $1,8901533085ft
feet136.3 Continuous Width SF5137.3to $120 $5401673805ft
feet139.3 Driveway156.2to165611
$63,247.50TOTAL COST FOR:ALCOA AVEEside of Starting at:LEONIS BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
440
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
LEONIS BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912200934
Run ID
Alcoa Ave
55
ID Sidewalk Width
Priority
feet 3.0-4.00.5 Cross Slope (PAR)SF10013.4to $120 $11,9971479878ft
feet 2.0-3.015.8 Cross Slope (PAR)SF1918.2to $120 $2,2321479888ft
feet20.5 Driveway72.3to165175
feet 2.0-3.073.3 Cross Slope (PAR)SF4779.4to $120 $5,6731479898ft
feet 2.0-3.086.4 Cross Slope (PAR)SF5293.1to $120 $6,2311479908ft
feet93.1 Driveway105.8to165176
$26,133.00TOTAL COST FOR:ALCOA AVEWside of Starting at:LEONIS BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
441
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
5232 ALCOA AVE
End Street Name
1912121539
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet 2.0-3.02.8 Cross Slope (PAR)SF54.0to $120 $6481457335ft
feet4.3 Driveway49.9to164959
feet -.2826.8 Vertical Change REF527.8to134902 5 ft
feet 2.0-3.053.3 Cross Slope (PAR)SF4863.9to $120 $5,7241457345ft
feet 2.0-3.066.6 Cross Slope (PAR)SF7182.3to $120 $8,4781457355ft
feet .2667.9 Vertical Change REF568.9to134904 5 ft
feet .4172.8 Vertical Change REF573.8to134905 5 ft
feet 4.0-5.082.3 Cross Slope (PAR)SF6195.8to $120 $7,2901457365ft
feet 2.0-3.096.9 Cross Slope (PAR)SF798.4to $120 $8101457375ft
feet 2.0-3.0114.0 Cross Slope (PAR)SF105137.4to $120 $12,6361457385ft
feet 3.0-4.0139.7 Cross Slope (PAR)SF5140.8to $120 $5941457395ft
feet .47142.8 Vertical Change LF5143.8to $75 $3381349065ft
feet 4.0-5.0151.1 Cross Slope (PAR)SF10153.3to $120 $1,1881457405ft
feet 1.01152.7 Vertical Change REF5153.7to134907 5 ft
feet153.3 Driveway171.5to164960
feet .72155.2 Vertical Change REF12157.9to134908 5 ft
feet .41159.9 Vertical Change REF12162.6to134909 5 ft
feet .86163.3 Vertical Change REF4164.3to134910 5 ft
feet 5.0-6.0171.9 Cross Slope (Driveway)SF17175.6to $40 $6661457415ft
feet 3.63172.1 Vertical Change REF5173.1to134911 5 ft
feet 3.0-4.0175.6 Cross Slope (PAR)SF72191.5to $120 $8,5861457425ft
feet 2.0-3.0194.3 Cross Slope (PAR)SF38202.8to $120 $4,5901457435ft
feet .28196.6 Vertical Change REF5197.6to134913 5 ft
feet 2.0-3.0208.7 Cross Slope (PAR)SF64222.9to $120 $7,6681457445ft
feet .33208.9 Vertical Change REF5209.9to134914 5 ft
feet 4.0-5.0222.9 Cross Slope (PAR)SF5223.9to $120 $5401457455ft
feet 3.0-4.0226.0 Cross Slope (PAR)SF5227.0to $120 $5401457465ft
feet 2.0-3.0227.0 Cross Slope (PAR)SF5228.2to $120 $6481457475ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
442
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
5232 ALCOA AVE
End Street Name
1912121539
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet 3.0-4.0230.7 Cross Slope (PAR)SF14233.8to $120 $1,6741457485ft
feet 2.0-3.0234.2 Cross Slope (PAR)SF67249.0to $120 $7,9921457495ft
feet 4.0-5.0249.8 Cross Slope (PAR)SF9251.9to $120 $1,1341457505ft
feet 4.0-5.0254.1 Cross Slope (PAR)SF35261.8to $120 $4,1581457515ft
feet -.3258.1 Vertical Change REF5259.1to134915 5 ft
feet267.1 Driveway295.2to164961
feet 3.0-4.0295.2 Cross Slope (Driveway)SF92315.6to $40 $3,6721457525ft
feet -.38310.0 Vertical Change REF5311.0to134916 5 ft
feet 2.0-3.0315.9 Cross Slope (PAR)SF22320.8to $120 $2,6461457535ft
feet320.8 Driveway348.1to164962
feet 2.0-3.0348.8 Cross Slope (PAR)SF7350.3to $120 $8101457545ft
feet 2.0-3.0354.9 Cross Slope (PAR)SF14358.0to $120 $1,6741457555ft
feet 4.0-5.0358.0 Cross Slope (PAR)SF126385.9to $120 $15,0661457565ft
feet 2.0-3.0387.3 Cross Slope (PAR)SF6388.6to $120 $7021457575ft
feet -.32389.6 Vertical Change LF5390.6to $75 $3381349175ft
feet 2.0-3.0391.3 Cross Slope (PAR)SF10393.5to $120 $1,1881457585ft
feet394.5 Driveway428.9to164963
feet -.27428.3 Vertical Change REF5429.3to134918 5 ft
feet 4.0-5.0430.2 Cross Slope (PAR)SF17434.0to $120 $2,0521457595ft
feet 2.0-3.0434.0 Cross Slope (PAR)SF18438.0to $120 $2,1601457605ft
feet 3.0-4.0441.3 Cross Slope (PAR)SF108465.2to $120 $12,9061457615ft
feet -.31452.0 Vertical Change REF5453.0to134919 5 ft
feet 2.0-3.0466.0 Cross Slope (PAR)SF61479.5to $120 $7,2901457625ft
feet481.7 Driveway521.2to164964
feet -.27481.9 Vertical Change REF5482.9to134920 5 ft
feet .42498.5 Vertical Change REF5499.5to134921 5 ft
feet519.4 Continuous Width SF5520.4to $120 $5401675715ft
feet 4.0-5.0521.2 Cross Slope (Driveway)SF14524.2to $40 $5401457635ft
feet 2.0-3.0525.9 Cross Slope (PAR)SF48536.5to $120 $5,7241457645ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
443
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
5232 ALCOA AVE
End Street Name
1912121539
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet 4.0-5.0537.0 Cross Slope (PAR)SF62550.7to $120 $7,3981457655ft
feet 2.0-3.0550.7 Cross Slope (PAR)SF19554.9to $120 $2,2681457665ft
feet 4.0-5.0554.9 Cross Slope (PAR)SF7556.4to $120 $8101457675ft
feet 3.0-4.0559.1 Cross Slope (PAR)SF26564.9to $120 $3,1321457685ft
feet 4.0-5.0567.8 Cross Slope (PAR)SF67582.6to $120 $7,9921457695ft
feet 2.0-3.0585.6 Cross Slope (PAR)SF33592.9to $120 $3,9421457705ft
feet 4.0-5.0593.5 Cross Slope (PAR)SF29599.9to $120 $3,4561457715ft
feet 3.0-4.0602.8 Cross Slope (PAR)SF76619.7to $120 $9,1261457725ft
feet604.9 Continuous Width SF5605.9to $120 $5401668375ft
feet619.7 Driveway650.8to164965
feet -.26632.7 Vertical Change REF5633.7to134922 5 ft
feet .29640.3 Vertical Change REF5641.3to134923 5 ft
feet .95643.4 Vertical Change REF5644.4to134924 5 ft
feet .31650.1 Vertical Change REF5651.1to134925 5 ft
feet 6.0-7.0651.0 Cross Slope (Driveway)SF5652.1to $40 $1981457735ft
feet -.28653.1 Vertical Change LF5654.1to $75 $3381349265ft
feet .33654.9 Vertical Change LF5655.9to $75 $3381349275ft
feet 3.0-4.0658.0 Cross Slope (PAR)SF5659.0to $120 $5401457745ft
feet 2.0-3.0659.0 Cross Slope (PAR)SF23664.2to $120 $2,8081457755ft
feet 3.0-4.0668.4 Cross Slope (PAR)SF11670.9to $120 $1,3501457765ft
feet 2.0-3.0673.0 Cross Slope (PAR)SF7674.5to $120 $8101457775ft
feet 4.0-5.0675.5 Cross Slope (PAR)SF8677.2to $120 $9181457785ft
feet678.5 Driveway717.2to164966
feet 4.0-5.0717.2 Cross Slope (Driveway)SF78734.6to $40 $3,1321457795ft
feet 5.0-6.0738.9 Cross Slope (PAR)SF19743.1to $120 $2,2681457805ft
feet -.27742.8 Vertical Change REF5743.8to134928 5 ft
feet743.1 Driveway767.2to164967
feet 5.0-6.0768.3 Cross Slope (PAR)SF5769.4to $120 $5941457815ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
444
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
5232 ALCOA AVE
End Street Name
1912121539
Run ID
Alcoa Ave
92
ID Sidewalk Width
Priority
feet 6.0-7.0769.4 Cross Slope (PAR)SF10771.6to $120 $1,1881457825ft
feet 2.0-3.0772.9 Cross Slope (PAR)SF9775.0to $120 $1,1341457835ft
feet 2.0-3.0784.6 Cross Slope (PAR)SF24789.9to $120 $2,8621457845ft
feet -.38792.0 Vertical Change REF5793.0to134929 5 ft
feet 4.0-5.0792.3 Cross Slope (PAR)SF68807.3to $120 $8,1001457855ft
feet 6.0-7.0807.3 Cross Slope (PAR)SF18811.2to $120 $2,1061457865ft
feet 5.0-6.0812.2 Cross Slope (PAR)SF16815.7to $120 $1,8901457875ft
feet 3.0-4.0815.7 Cross Slope (PAR)SF30822.3to $120 $3,5641457885ft
feet 5.0-6.0823.1 Cross Slope (PAR)SF51834.4to $120 $6,1021457895ft
feet835.1 Driveway853.0to164968
feet 6.0-7.0853.0 Cross Slope (Driveway)SF8854.8to $40 $3241457905ft
feet 5.0-6.0855.2 Cross Slope (PAR)SF15858.5to $120 $1,7821457915ft
feet858.5 Driveway881.3to164969
feet 2.0-3.0881.4 Cross Slope (Driveway)SF6882.7to $40 $2341457925ft
feet .28883.3 Vertical Change LF5884.3to $75 $3381349305ft
feet .41893.9 Vertical Change LF5894.9to $75 $3381349315ft
feet 2.0-3.0903.9 Cross Slope (PAR)SF16907.4to $120 $1,8901457935ft
feet 2.0-3.0909.6 Cross Slope (PAR)SF18913.5to $120 $2,1061457945ft
feet -.26919.7 Vertical Change REF5920.7to134932 5 ft
feet 2.0-3.0920.4 Cross Slope (PAR)SF27926.3to $120 $3,1861457955ft
feet 4.0-5.0926.3 Cross Slope (PAR)SF62940.1to $120 $7,4521457965ft
feet -.34934.2 Vertical Change LF5935.2to $75 $3381349335ft
feet942.8 Driveway965.8to164970
feet -.41956.2 Vertical Change REF5957.2to134934 5 ft
feet 2.0-3.0967.2 Cross Slope (PAR)SF5968.3to $120 $5941457975ft
feet .29968.0 Vertical Change REF5969.0to134935 5 ft
$230,692.50TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
445
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
LEONIS BLVD
End Street Name
1912200956
Run ID
Alcoa Ave
71
ID Sidewalk Width
Priority
feet 2.0-3.03.8 Cross Slope (PAR)SF4513.2to $120 $5,3581479425ft
feet10.0 Continuous Width SF511.0to $120 $5701674085ft
feet 4.0-5.013.2 Cross Slope (PAR)SF1917.2to $120 $2,2801479435ft
feet 2.0-3.017.2 Cross Slope (PAR)SF2522.4to $120 $2,9641479445ft
feet 2.0-3.030.6 Cross Slope (PAR)SF3638.1to $120 $4,2751479455ft
feet 3.4932.5 Vertical Change REF533.5to135854 5 ft
feet 4.0-5.038.1 Cross Slope (PAR)SF329107.3to $120 $39,4441479465ft
feet 2.0-3.0107.6 Cross Slope (PAR)SF47117.4to $120 $5,5861479475ft
feet117.1 Continuous Width REF5118.1to167677 5 ft
feet118.0 Continuous Width SF5119.0to $120 $5701669975ft
$61,047.00TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
446
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 44TH ST
End Street Name
2001141537
Run ID
Alcoa Ave
93.5
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF628.3to $120 $7,4701532258ft
feet -.32.1 Vertical Change REF83.1to137214 8 ft
feet 2.0-3.012.6 Cross Slope (PAR)SF1314.3to $120 $1,5301532268ft
feet14.3 Driveway62.3to165605
feet -.3320.7 Vertical Change REF821.7to137215 8 ft
feet .2829.3 Vertical Change REF830.3to137216 8 ft
feet 2.0-3.067.9 Cross Slope (PAR)SF8979.8to $120 $10,7101532278ft
feet .584.6 Vertical Change SF885.6to $75 $5631372188ft
feet 2.0-3.089.8 Cross Slope (PAR)SF890.8to $120 $9001532288ft
feet 2.0-3.095.4 Cross Slope (PAR)SF127112.3to $120 $15,2101532298ft
feet 2.0-3.0116.6 Cross Slope (PAR)SF32120.8to $120 $3,7801532308ft
feet 2.0-3.0124.8 Cross Slope (PAR)SF14126.6to $120 $1,6201532318ft
feet 2.0-3.0137.1 Cross Slope (PAR)SF17139.3to $120 $1,9801532328ft
feet 2.0-3.0142.3 Cross Slope (PAR)SF26145.8to $120 $3,1501532338ft
feet 2.0-3.0150.3 Cross Slope (PAR)SF8151.4to $120 $9901532348ft
feet .27155.0 Vertical Change LF8156.0to $75 $5631372198ft
feet 2.0-3.0158.8 Cross Slope (PAR)SF13160.5to $120 $1,5301532358ft
feet .67159.5 Vertical Change REF8160.5to137220 8 ft
feet 2.0-3.0170.7 Cross Slope (PAR)SF26174.2to $120 $3,1501532368ft
feet .3179.6 Vertical Change LF8180.6to $75 $5631372218ft
feet 2.0-3.0191.7 Cross Slope (PAR)SF31195.8to $120 $3,6901532378ft
feet 2.0-3.0199.3 Cross Slope (PAR)SF43205.0to $120 $5,1301532388ft
feet 2.0-3.0210.0 Cross Slope (PAR)SF40215.3to $120 $4,7701532398ft
feet 4.0-5.0215.3 Cross Slope (PAR)SF100228.6to $120 $11,9701532408ft
feet228.3 Continuous Width REF8229.3to167229 8 ft
feet 2.0-3.0233.1 Cross Slope (PAR)SF8234.1to $120 $9001532418ft
feet 4.0-5.0234.8 Cross Slope (PAR)SF10236.1to $120 $1,1701532428ft
feet238.6 Continuous Width SF8239.6to $120 $9001674188ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
447
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 44TH ST
End Street Name
2001141537
Run ID
Alcoa Ave
93.5
ID Sidewalk Width
Priority
feet 5.0-6.0240.3 Cross Slope (PAR)SF19242.8to $120 $2,2501532438ft
feet 3.0-4.0242.8 Cross Slope (PAR)SF47249.0to $120 $5,5801532448ft
feet 2.0-3.0249.8 Cross Slope (PAR)SF9251.0to $120 $1,0801532458ft
feet 3.0-4.0253.4 Cross Slope (PAR)SF34257.9to $120 $4,0501532468ft
feet 4.0-5.0260.8 Cross Slope (PAR)SF8261.9to $120 $9901532478ft
feet266.1 Driveway295.2to165606
feet .39266.2 Vertical Change REF8267.2to137222 8 ft
feet .34289.0 Vertical Change REF8290.0to137223 8 ft
feet 1.2292.4 Vertical Change REF8293.4to137224 8 ft
feet 2.0-3.0296.7 Cross Slope (PAR)SF8297.8to $120 $9901532488ft
feet 3.0-4.0301.8 Cross Slope (PAR)SF34306.4to $120 $4,1401532498ft
feet307.7 Driveway334.0to165607
feet 3.0-4.0334.1 Cross Slope (Driveway)SF53341.1to $40 $2,1001532508ft
feet 2.0-3.0341.9 Cross Slope (PAR)SF194367.8to $120 $23,3101532518ft
feet359.9 Continuous Width REF8360.9to167183 8 ft
feet 1.36362.6 Vertical Change REF8363.6to137225 8 ft
feet364.9 Continuous Width SF8365.9to $120 $9001674198ft
feet .27367.6 Vertical Change REF8368.6to137226 8 ft
feet369.3 Driveway424.3to165608
feet -.26375.0 Vertical Change REF8376.0to137227 8 ft
feet 3.0-4.0425.1 Cross Slope (PAR)SF8426.2to $120 $9901532528ft
feet 2.0-3.0427.6 Cross Slope (PAR)SF28431.3to $120 $3,3301532538ft
feet 2.0-3.0435.8 Cross Slope (PAR)SF138454.2to $120 $16,5601532548ft
feet .3455.0 Vertical Change LF8456.0to $75 $5631372288ft
feet 2.0-3.0456.3 Cross Slope (PAR)SF230486.9to $120 $27,5401532558ft
feet .27461.9 Vertical Change REF8462.9to137229 8 ft
feet .3466.2 Vertical Change REF8467.2to137230 8 ft
feet 2.0-3.0491.0 Cross Slope (PAR)SF8492.0to $120 $9001532568ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
448
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 44TH ST
End Street Name
2001141537
Run ID
Alcoa Ave
93.5
ID Sidewalk Width
Priority
feet 3.0-4.0495.3 Cross Slope (PAR)SF23498.3to $120 $2,7001532578ft
feet 2.0-3.0499.3 Cross Slope (PAR)SF14501.1to $120 $1,6201532588ft
feet 2.0-3.0507.7 Cross Slope (PAR)SF56515.2to $120 $6,7501532598ft
feet 2.0-3.0526.3 Cross Slope (PAR)SF74536.2to $120 $8,9101532608ft
feet -.27536.1 Vertical Change REF8537.1to137231 8 ft
feet 4.0-5.0536.2 Cross Slope (PAR)SF49542.7to $120 $5,8501532618ft
feet 6.0-7.0542.8 Cross Slope (PAR)SF13544.5to $120 $1,5301532628ft
feet 5.0-6.0544.5 Cross Slope (PAR)SF23547.5to $120 $2,7001532638ft
feet 3.0-4.0548.3 Cross Slope (PAR)SF21551.1to $120 $2,5201532648ft
feet 2.0-3.0551.1 Cross Slope (PAR)SF89562.9to $120 $10,6201532658ft
feet 4.0-5.0563.5 Cross Slope (PAR)SF17565.7to $120 $1,9801532668ft
feet 2.0-3.0566.6 Cross Slope (PAR)SF88578.3to $120 $10,5301532678ft
feet 2.0-3.0582.4 Cross Slope (PAR)SF22585.3to $120 $2,6101532688ft
feet 2.0-3.0589.2 Cross Slope (PAR)SF17591.5to $120 $2,0701532698ft
feet 2.0-3.0597.3 Cross Slope (PAR)SF26600.8to $120 $3,1501532708ft
feet 2.0-3.0617.0 Cross Slope (PAR)SF93629.4to $120 $11,1601532718ft
feet 4.0-5.0629.4 Cross Slope (PAR)SF75639.4to $120 $9,0001532728ft
feet 2.0-3.0641.1 Cross Slope (PAR)SF65649.8to $120 $7,8301532738ft
feet 4.0-5.0650.2 Cross Slope (PAR)SF145669.6to $120 $17,4601532748ft
feet 2.0-3.0671.0 Cross Slope (PAR)SF109685.5to $120 $13,0501532758ft
feet 4.0-5.0686.6 Cross Slope (PAR)SF65695.2to $120 $7,7401532768ft
feet695.7 Driveway748.8to165609
feet 2.0-3.0750.2 Cross Slope (PAR)SF83761.3to $120 $9,9901532778ft
feet 2.0-3.0766.2 Cross Slope (PAR)SF220795.5to $120 $26,3701532788ft
feet 2.0-3.0797.8 Cross Slope (PAR)SF8798.9to $120 $9901532798ft
feet 2.0-3.0811.6 Cross Slope (PAR)SF42817.2to $120 $5,0401532808ft
feet 2.0-3.0824.7 Cross Slope (PAR)SF8825.8to $120 $9901532818ft
feet 4.0-5.0826.9 Cross Slope (PAR)SF65835.6to $120 $7,8301532828ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
449
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 44TH ST
End Street Name
2001141537
Run ID
Alcoa Ave
93.5
ID Sidewalk Width
Priority
feet 2.0-3.0835.6 Cross Slope (PAR)SF13837.3to $120 $1,5301532838ft
feet 2.0-3.0843.8 Cross Slope (PAR)SF195869.8to $120 $23,4001532848ft
feet 2.0-3.0872.9 Cross Slope (PAR)SF17875.1to $120 $1,9801532858ft
feet 2.0-3.0877.8 Cross Slope (PAR)SF44883.7to $120 $5,3101532868ft
feet 2.0-3.0886.5 Cross Slope (PAR)SF87898.1to $120 $10,4401532878ft
feet .34897.7 Vertical Change REF8898.7to137232 8 ft
feet 9.0-10.0901.3 Cross Slope (PAR)SF10902.6to $120 $1,1701532888ft
feet911.7 Driveway938.5to165610
feet .55912.2 Vertical Change REF8913.2to137233 8 ft
feet 2.0-3.0939.5 Cross Slope (PAR)SF17941.8to $120 $2,0701532898ft
feet 2.0-3.0951.8 Cross Slope (PAR)SF58959.5to $120 $6,9301532908ft
$411,330.00TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
450
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E VERNON AVE
End Street Name
2001141546
Run ID
Alcoa Ave
58.5
ID Sidewalk Width
Priority
feet -.280.4 Vertical Change REF81.4to137206 8 ft
feet 8.0-9.00.8 Cross Slope (PAR)SF213.5to $120 $2,5111531878ft
feet 3.0-4.05.3 Cross Slope (PAR)SF86.3to $120 $9301531888ft
feet 2.0-3.06.3 Cross Slope (PAR)SF7315.7to $120 $8,7421531898ft
feet 3.417.0 Vertical Change SF818.0to $75 $5811372078ft
feet 2.0-3.018.9 Cross Slope (PAR)SF3623.6to $120 $4,3711531908ft
feet 2.0-3.033.3 Cross Slope (PAR)SF1535.2to $120 $1,7671531918ft
feet 2.0-3.048.5 Cross Slope (PAR)SF849.5to $120 $9301531928ft
feet 4.0-5.050.7 Cross Slope (PAR)SF2954.4to $120 $3,4411531938ft
feet 2.0-3.061.6 Cross Slope (PAR)SF3466.0to $120 $4,0921531948ft
feet 2.0-3.069.6 Cross Slope (PAR)SF11584.4to $120 $13,7641531958ft
feet 3.0-4.086.7 Cross Slope (PAR)SF987.8to $120 $1,0231531968ft
feet 2.0-3.087.9 Cross Slope (PAR)SF7096.9to $120 $8,3701531978ft
feet 3.0-4.099.4 Cross Slope (PAR)SF13101.1to $120 $1,5811531988ft
feet 3.0-4.0106.1 Cross Slope (PAR)SF9107.3to $120 $1,1161531998ft
feet 2.0-3.0107.3 Cross Slope (PAR)SF61115.2to $120 $7,3471532008ft
feet 3.0-4.0118.5 Cross Slope (PAR)SF157138.7to $120 $18,7861532018ft
feet 4.0-5.0142.8 Cross Slope (PAR)SF42148.2to $120 $5,0221532028ft
feet 2.0-3.0157.3 Cross Slope (PAR)SF13159.0to $120 $1,5811532038ft
feet 3.0-4.0163.2 Cross Slope (PAR)SF76173.0to $120 $9,1141532048ft
feet 3.0-4.0178.3 Cross Slope (PAR)SF23181.3to $120 $2,7901532058ft
feet 4.0-5.0184.6 Cross Slope (PAR)SF147203.6to $120 $17,6701532068ft
$115,529.25TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
451
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121631
Run ID
Alcoa Ave
99
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF131.8to $120 $1,5661455747ft
feet1.8 Driveway44.8to164941
feet 4.0-5.046.3 Cross Slope (PAR)SF15467.6to $120 $18,5311455757ft
feet -.2849.8 Vertical Change REF750.8to134804 7 ft
feet 2.0-3.068.0 Cross Slope (PAR)SF18994.0to $120 $22,6201455767ft
feet -.2874.7 Vertical Change REF775.7to134805 7 ft
feet .3476.8 Vertical Change REF777.8to134806 7 ft
feet 4.0-5.094.3 Cross Slope (PAR)SF145114.3to $120 $17,4001455777ft
feet 2.0-3.0114.3 Cross Slope (PAR)SF183139.5to $120 $21,9241455787ft
feet .26137.2 Vertical Change REF7138.2to134807 7 ft
feet 4.0-5.0140.0 Cross Slope (PAR)SF42145.8to $120 $5,0461455797ft
feet 2.0-3.0145.8 Cross Slope (PAR)SF66154.9to $120 $7,9171455807ft
feet 4.0-5.0154.9 Cross Slope (PAR)SF123171.8to $120 $14,7031455817ft
feet .33164.5 Vertical Change REF7165.5to134808 7 ft
feet 2.0-3.0171.8 Cross Slope (PAR)SF120188.3to $120 $14,3551455827ft
feet -.27180.6 Vertical Change REF7181.6to134809 7 ft
feet -.27189.0 Vertical Change LF7190.0to $75 $5441348107ft
feet189.0 Driveway231.4to164942
feet .27230.1 Vertical Change REF7231.1to134811 7 ft
feet 4.0-5.0231.8 Cross Slope (PAR)SF17234.1to $120 $2,0011455837ft
feet 2.0-3.0234.1 Cross Slope (PAR)SF59242.3to $120 $7,1341455847ft
feet 2.0-3.0246.0 Cross Slope (PAR)SF9247.3to $120 $1,1311455857ft
feet246.5 Continuous Width SF7247.5to $120 $8701675707ft
feet248.0 Driveway314.5to164943
feet .32260.2 Vertical Change REF7261.2to134812 7 ft
feet .4269.0 Vertical Change REF7270.0to134813 7 ft
feet .4281.6 Vertical Change REF20284.3to134814 7 ft
feet .39303.9 Vertical Change REF7304.9to134815 7 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
452
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121631
Run ID
Alcoa Ave
99
ID Sidewalk Width
Priority
feet -.26307.6 Vertical Change REF7308.6to134816 7 ft
feet .42314.4 Vertical Change REF7315.4to134817 7 ft
feet 3.0-4.0314.9 Cross Slope (PAR)SF43320.8to $120 $5,1331455867ft
feet 5.0-6.0321.8 Cross Slope (PAR)SF30325.9to $120 $3,5671455877ft
feet 3.0-4.0325.9 Cross Slope (PAR)SF47332.4to $120 $5,6551455887ft
feet 5.0-6.0332.4 Cross Slope (PAR)SF119348.8to $120 $14,2681455897ft
feet -.36340.1 Vertical Change REF7341.1to134818 7 ft
feet340.8 Continuous Width REF7341.8to166947 7 ft
feet 6.0-7.0348.8 Cross Slope (PAR)SF33353.3to $120 $3,9151455907ft
feet 1354.6 Vertical Change REF7355.6to134819 7 ft
feet 5.0-6.0354.6 Cross Slope (PAR)SF28358.5to $120 $3,3931455917ft
feet357.6 Continuous Width SF7358.6to $120 $8701676037ft
feet359.4 Driveway392.7to164944
feet .29392.0 Vertical Change REF7393.0to134821 7 ft
feet 2.0-3.0394.4 Cross Slope (PAR)SF116410.4to $120 $13,9201455927ft
feet395.2 Continuous Width SF7396.2to $120 $8701674997ft
feet .32407.4 Vertical Change REF7408.4to134822 7 ft
feet 4.0-5.0410.4 Cross Slope (PAR)SF111425.7to $120 $13,3111455937ft
feet -.27422.5 Vertical Change REF7423.5to134823 7 ft
feet425.8 Driveway469.3to164945
feet 2.0-3.0471.9 Cross Slope (PAR)SF38477.1to $120 $4,5241455947ft
feet 2.0-3.0484.9 Cross Slope (PAR)SF25488.4to $120 $3,0451455957ft
feet 4.0-5.0488.4 Cross Slope (PAR)SF40493.9to $120 $4,7851455967ft
feet 3.0-4.0497.3 Cross Slope (PAR)SF61505.7to $120 $7,3081455977ft
feet 2.0-3.0507.0 Cross Slope (PAR)SF89519.3to $120 $10,7011455987ft
feet521.1 Driveway551.2to164946
feet -.27521.7 Vertical Change REF7522.7to134825 7 ft
feet .94536.7 Vertical Change REF7537.7to134826 7 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
453
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121631
Run ID
Alcoa Ave
99
ID Sidewalk Width
Priority
feet 5.0-6.0551.8 Cross Slope (PAR)SF38557.0to $120 $4,5241455997ft
feet 3.0-4.0557.0 Cross Slope (PAR)SF9558.2to $120 $1,0441456007ft
feet 2.0-3.0558.2 Cross Slope (PAR)SF15560.3to $120 $1,8271456017ft
feet560.5 Driveway597.8to164947
feet 1.78574.5 Vertical Change REF7575.5to134827 7 ft
feet 2.0-3.0601.9 Cross Slope (PAR)SF28605.7to $120 $3,3061456027ft
feet 4.0-5.0607.9 Cross Slope (PAR)SF123624.8to $120 $14,7031456037ft
feet612.4 Continuous Width SF7613.4to $120 $8701674687ft
feet -.33613.8 Vertical Change REF7614.8to134829 7 ft
feet 6.0-7.0625.1 Cross Slope (PAR)SF17627.5to $120 $2,0881456047ft
feet 5.0-6.0627.5 Cross Slope (PAR)SF8628.6to $120 $9571456057ft
feet 3.0-4.0636.8 Cross Slope (PAR)SF105651.3to $120 $12,6151456067ft
feet 4.0-5.0653.7 Cross Slope (PAR)SF18656.2to $120 $2,1751456077ft
feet 4.0-5.0658.3 Cross Slope (PAR)SF135676.9to $120 $16,1821456087ft
feet666.9 Continuous Width REF7667.9to166852 7 ft
feet -.5669.5 Vertical Change REF7670.5to134830 7 ft
feet676.6 Continuous Width SF7677.6to $120 $8701674487ft
feet 2.0-3.0676.9 Cross Slope (PAR)SF117693.1to $120 $14,0941456097ft
feet 2.62678.9 Vertical Change REF7679.9to134831 7 ft
feet691.8 Continuous Width REF7692.8to167241 7 ft
feet 2.0-3.0697.6 Cross Slope (PAR)SF54705.0to $120 $6,4381456107ft
feet 4.0-5.0705.0 Cross Slope (PAR)SF63713.7to $120 $7,5691456117ft
feet 2.0-3.0715.2 Cross Slope (PAR)SF31719.5to $120 $3,7411456127ft
feet -.35718.3 Vertical Change REF7719.3to134832 7 ft
feet 4.0-5.0720.3 Cross Slope (PAR)SF25723.8to $120 $3,0451456137ft
feet 2.0-3.0726.3 Cross Slope (PAR)SF20729.1to $120 $2,4361456147ft
feet 4.0-5.0729.1 Cross Slope (PAR)SF31733.4to $120 $3,7411456157ft
feet 2.0-3.0734.6 Cross Slope (PAR)SF107749.3to $120 $12,7891456167ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
454
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E SLAUSON AVE
End Street Name
1912121631
Run ID
Alcoa Ave
99
ID Sidewalk Width
Priority
feet735.8 Continuous Width SF7736.8to $120 $8701675927ft
feet 2.0-3.0752.7 Cross Slope (PAR)SF95765.8to $120 $11,3971456177ft
feet 2.0-3.0772.0 Cross Slope (PAR)SF131790.0to $120 $15,6601456187ft
feet784.3 Continuous Width REF7785.3to167264 7 ft
feet 4.0-5.0791.1 Cross Slope (PAR)SF136809.8to $120 $16,2691456197ft
feet -.46806.4 Vertical Change REF7807.4to134834 7 ft
feet 2.0-3.0810.5 Cross Slope (PAR)SF170833.9to $120 $20,3581456207ft
feet812.7 Continuous Width REF7813.7to167734 7 ft
feet 6.0-7.0833.7 Running Slope REF8834.8to166447 7 ft
feet 8.0-9.0834.9 Running Slope SF43840.8to $120 $5,1331664487ft
feet -.85842.9 Vertical Change SF7843.9to $75 $5441348357ft
feet 4.0-5.0846.8 Cross Slope (PAR)SF78857.5to $120 $9,3091456217ft
feet 7.0-8.0848.8 Running Slope REF27852.5to166449 7 ft
feet 2.0-3.0857.5 Cross Slope (PAR)SF60865.8to $120 $7,2211456227ft
feet 2.0-3.0893.6 Cross Slope (PAR)SF49900.4to $120 $5,9161456237ft
feet 5.0-6.0897.4 Running Slope REF28901.3to166450 7 ft
feet 6.0-7.0901.3 Running Slope REF9902.6to166451 7 ft
feet 4.0-5.0901.4 Cross Slope (PAR)SF20904.2to $120 $2,4361456247ft
feet 2.0-3.0911.6 Cross Slope (PAR)SF12913.3to $120 $1,4791456257ft
feet 3.0-4.0916.3 Cross Slope (PAR)SF13918.1to $120 $1,5661456267ft
feet918.3 Continuous Width SF7919.3to $120 $8701669967ft
$445,048.50TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
455
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING (4927 ALCOA
AVE)
End Street Name
1912200937
Run ID
Alcoa Ave
60
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF506.5to $120 $6,0451479758ft
feet 2.0-3.011.5 Cross Slope (PAR)SF19837.0to $120 $23,7151479768ft
feet -.4624.9 Vertical Change REF825.9to135864 8 ft
feet -.329.1 Vertical Change REF830.1to135865 8 ft
feet 4.0-5.037.0 Cross Slope (PAR)SF5544.1to $120 $6,6031479778ft
feet 2.0-3.044.8 Cross Slope (PAR)SF10958.9to $120 $13,1131479788ft
feet 2.0-3.068.1 Cross Slope (PAR)SF3072.0to $120 $3,6271479798ft
feet 2.0-3.076.3 Cross Slope (PAR)SF3680.9to $120 $4,2781479808ft
feet 2.0-3.086.5 Cross Slope (PAR)SF3691.1to $120 $4,2781479818ft
feet 2.0-3.099.5 Cross Slope (PAR)SF40104.7to $120 $4,8361479828ft
feet 2.0-3.0108.6 Cross Slope (PAR)SF403160.6to $120 $48,3601479838ft
feet -.34113.1 Vertical Change REF8114.1to135866 8 ft
feet .36119.1 Vertical Change REF8120.1to135867 8 ft
feet .32162.6 Vertical Change REF8163.6to135868 8 ft
feet 4.0-5.0163.0 Cross Slope (PAR)SF10164.3to $120 $1,2091479848ft
feet 3.0-4.0167.9 Cross Slope (PAR)SF50174.3to $120 $5,9521479858ft
feet 2.0-3.0175.0 Cross Slope (PAR)SF9176.2to $120 $1,1161479868ft
feet -.3181.1 Vertical Change LF8182.1to $75 $5811358698ft
feet185.5 Driveway241.2to165174
feet -.36199.1 Vertical Change REF8200.1to135870 8 ft
feet -.27237.7 Vertical Change REF8238.7to135871 8 ft
$123,713.25TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
456
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
LEONIS BLVD
End Street Name
2001141521
Run ID
Alcoa Ave
71
ID Sidewalk Width
Priority
feet 2.0-3.06.7 Cross Slope (PAR)SF5418.6to $120 $6,4261533095ft
feet20.3 Continuous Width SF521.3to $120 $5401674205ft
feet 2.0-3.021.8 Cross Slope (PAR)SF2226.7to $120 $2,6461533105ft
feet 2.0-3.031.3 Cross Slope (PAR)SF3238.5to $120 $3,8881533115ft
feet33.3 Continuous Width SF534.3to $120 $5401674215ft
feet .5135.9 Vertical Change REF536.9to137236 5 ft
feet 4.0-5.038.7 Cross Slope (PAR)SF2544.3to $120 $3,0241533125ft
feet 2.0-3.045.2 Cross Slope (PAR)SF3553.0to $120 $4,2121533135ft
feet 4.0-5.053.3 Cross Slope (PAR)SF7870.7to $120 $9,3961533145ft
feet .2655.6 Vertical Change REF556.6to137237 5 ft
feet 2.0-3.071.7 Cross Slope (PAR)SF973.8to $120 $1,1341533155ft
feet 2.0-3.077.0 Cross Slope (PAR)SF1981.3to $120 $2,3221533165ft
feet85.2 Continuous Width SF586.2to $120 $5401669205ft
feet 2.0-3.086.7 Cross Slope (PAR)SF2391.8to $120 $2,7541533175ft
feet 2.0-3.094.7 Cross Slope (PAR)SF86113.8to $120 $10,3141533185ft
feet113.6 Continuous Width SF5114.6to $120 $5401674605ft
feet 4.0-5.0115.3 Cross Slope (PAR)SF60128.7to $120 $7,2361533195ft
feet -.26126.4 Vertical Change REF5127.4to137238 5 ft
feet128.0 Continuous Width REF5129.0to166954 5 ft
feet 2.0-3.0128.7 Cross Slope (PAR)SF14131.9to $120 $1,7281533205ft
feet 3.0-4.0136.8 Cross Slope (PAR)SF9138.8to $120 $1,0801533215ft
feet 2.0-3.0138.8 Cross Slope (PAR)SF23143.9to $120 $2,7541533225ft
feet 4.0-5.0144.8 Cross Slope (PAR)SF29151.2to $120 $3,4561533235ft
feet146.0 Continuous Width SF5147.0to $120 $5401669955ft
feet 2.0-3.0151.8 Cross Slope (PAR)SF28158.1to $120 $3,4021533245ft
feet152.4 Continuous Width SF5153.4to $120 $5401668095ft
$69,012.00TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
457
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 44TH ST
End Street Name
2001141659
Run ID
Alcoa Ave
38
ID Sidewalk Width
Priority
feet 3.0-4.00.3 Cross Slope (PAR)SF203.0to $120 $2,4301528678ft
feet3.0 Driveway14.8to165582
feet 2.0-3.014.8 Cross Slope (Driveway)SF2618.3to $40 $1,0501528688ft
feet 2.0-3.021.3 Cross Slope (PAR)SF22150.8to $120 $26,5501528698ft
feet .5927.4 Vertical Change REF2630.9to137140 8 ft
feet .333.1 Vertical Change REF834.1to137141 8 ft
feet -.4336.3 Vertical Change REF837.3to137142 8 ft
feet 2.0-3.060.8 Cross Slope (PAR)SF2864.6to $120 $3,4201528708ft
feet 2.0-3.066.9 Cross Slope (PAR)SF4873.3to $120 $5,7601528718ft
feet 2.0-3.076.3 Cross Slope (PAR)SF1177.8to $120 $1,3501528728ft
feet 3.0-4.080.1 Cross Slope (PAR)SF4786.4to $120 $5,6701528738ft
feet 2.0-3.086.6 Cross Slope (PAR)SF123103.0to $120 $14,7601528748ft
feet 3.0-4.0105.6 Cross Slope (PAR)SF23108.7to $120 $2,7901528758ft
feet 2.0-3.0109.2 Cross Slope (PAR)SF82120.1to $120 $9,8101528768ft
feet 2.0-3.0123.4 Cross Slope (PAR)SF72133.0to $120 $8,6401528778ft
feet 2.0-3.0147.1 Cross Slope (PAR)SF80157.8to $120 $9,6301528788ft
feet 2.0-3.0170.7 Cross Slope (PAR)SF24173.9to $120 $2,8801528798ft
feet 2.0-3.0177.3 Cross Slope (PAR)SF11178.7to $120 $1,2601528808ft
feet 2.0-3.0182.8 Cross Slope (PAR)SF81193.6to $120 $9,7201528818ft
feet 4.0-5.0193.6 Cross Slope (PAR)SF71203.0to $120 $8,4601528828ft
feet 4.0-5.0205.1 Cross Slope (PAR)SF8206.2to $120 $9901528838ft
feet 2.0-3.0207.9 Cross Slope (PAR)SF80218.5to $120 $9,5401528848ft
$124,710.00TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
458
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W ALCOA AVE
Street Side
TRAIN CROSSING (4927
ALCOA AVE)
Survey Street Name Starting Street Name
E 50TH ST
End Street Name
1912200943
Run ID
Alcoa Ave
104
ID Sidewalk Width
Priority
feet 5.0-6.00.2 Cross Slope (PAR)SF7215.3to $120 $8,6071479655ft
feet 6.0-7.018.5 Cross Slope (PAR)SF619.8to $120 $7411479665ft
feet 11.0-12.022.8 Cross Slope (PAR)SF1626.1to $120 $1,8811479675ft
feet 13.0-14.028.3 Cross Slope (PAR)SF2132.7to $120 $2,5081479685ft
feet 12.0-13.036.3 Cross Slope (PAR)SF1940.2to $120 $2,2231479695ft
feet 14.0-15.040.2 Cross Slope (PAR)SF1844.0to $120 $2,1661479705ft
feet -.2846.2 Vertical Change LF547.2to $75 $3561358605ft
feet50.7 Continuous Width SF551.7to $120 $5701674105ft
feet 2.0-3.051.5 Cross Slope (PAR)SF2156.0to $120 $2,5651479715ft
feet 3.3256.3 Vertical Change SF557.3to $75 $3561358615ft
feet 2.0-3.060.2 Cross Slope (PAR)SF7976.8to $120 $9,4621479725ft
feet68.3 Continuous Width SF569.3to $120 $5701671545ft
feet -.2672.8 Vertical Change REF573.8to135862 5 ft
feet76.8 Driveway102.2to165173
feet 4.0-5.0103.3 Cross Slope (PAR)SF5104.3to $120 $5701479735ft
feet 2.0-3.0104.8 Cross Slope (PAR)SF9106.7to $120 $1,0831479745ft
feet 2.77109.4 Vertical Change SF5110.4to $75 $3561358635ft
feet111.8 Continuous Width REF5112.8to166870 5 ft
$34,014.75TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING (4927 ALCOA
AVE)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
459
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N / E AYERS AVE
Street Side
4395 AYERS AVE
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001171008
Run ID
Ayers Ave
55
ID Sidewalk Width
Priority
feet 3.0-4.00.8 Cross Slope (PAR)SF304.3to $120 $3,5701586759ft
feet7.1 Driveway56.9to165993
feet .3457.1 Vertical Change REF958.1to138288 9 ft
feet 3.0-4.060.6 Cross Slope (PAR)SF1161.9to $120 $1,3261586769ft
feet 2.0-3.062.1 Cross Slope (PAR)SF963.1to $120 $1,0201586779ft
feet 2.2866.2 Vertical Change SF967.2to $75 $6381382899ft
feet -.4372.2 Vertical Change LF973.2to $75 $6381382919ft
feet .2873.9 Vertical Change LF974.9to $75 $6381382929ft
feet -.3176.1 Vertical Change LF977.1to $75 $6381382939ft
feet .3978.1 Vertical Change LF2480.9to $75 $1,7851382949ft
feet 5.0-6.079.9 Cross Slope (PAR)SF2683.0to $120 $3,1621586789ft
feet -.2881.8 Vertical Change REF982.8to138295 9 ft
feet 2.0-3.083.9 Cross Slope (PAR)SF2586.8to $120 $2,9581586799ft
feet88.7 Driveway111.3to165994
feet 3.0-4.0112.4 Cross Slope (PAR)SF97123.8to $120 $11,6281586809ft
feet .31119.7 Vertical Change REF9120.7to138296 9 ft
feet 2.0-3.0124.1 Cross Slope (PAR)SF62131.4to $120 $7,4461586819ft
feet 4.0-5.0134.3 Cross Slope (PAR)SF52140.4to $120 $6,2221586829ft
feet143.6 Driveway167.5to165995
feet 3.0-4.0168.3 Cross Slope (Driveway)SF19170.5to $40 $7481586839ft
feet171.4 Cold Patch 14173.0to140561 9 ft
feet 3.0-4.0174.4 Cross Slope (PAR)SF24177.2to $120 $2,8561586849ft
feet .29176.5 Vertical Change REF9177.5to138297 9 ft
feet 2.0-3.0181.6 Cross Slope (PAR)SF19183.8to $120 $2,2441586859ft
feet .26182.7 Vertical Change REF9183.7to138298 9 ft
feet .3187.1 Vertical Change LF9188.1to $75 $6381382999ft
feet .26191.1 Vertical Change LF48196.7to $75 $3,5701383009ft
feet 5.0-6.0196.7 Cross Slope (PAR)SF31200.3to $120 $3,6721586869ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
460
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N / E AYERS AVE
Street Side
4395 AYERS AVE
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001171008
Run ID
Ayers Ave
55
ID Sidewalk Width
Priority
feet 1.87199.2 Vertical Change REF9200.2to138301 9 ft
feet 2.0-3.0200.8 Cross Slope (PAR)SF9201.8to $120 $1,0201586879ft
feet .29203.3 Vertical Change LF40208.0to $75 $2,9961383029ft
feet 4.0-5.0206.1 Cross Slope (PAR)SF31209.7to $120 $3,6721586889ft
feet 2.0-3.0209.7 Cross Slope (PAR)SF49215.5to $120 $5,9161586899ft
feet 2.0-3.0218.7 Cross Slope (PAR)SF224245.1to $120 $26,9281586909ft
feet 3.49220.6 Vertical Change REF9221.6to138303 9 ft
feet .4225.2 Vertical Change REF9226.2to138304 9 ft
feet .26231.9 Vertical Change REF9232.9to138305 9 ft
feet 4.0-5.0247.3 Cross Slope (PAR)SF33251.2to $120 $3,9781586919ft
feet 3.0-4.0254.0 Cross Slope (PAR)SF11255.3to $120 $1,3261586929ft
feet 2.0-3.0256.3 Cross Slope (PAR)SF26259.3to $120 $3,0601586939ft
feet 3.0-4.0262.0 Cross Slope (PAR)SF75270.8to $120 $8,9761586949ft
feet 3.0-4.0274.2 Cross Slope (PAR)SF9275.3to $120 $1,1221586959ft
feet 2.0-3.0277.9 Cross Slope (PAR)SF11279.2to $120 $1,3261586969ft
feet 3.0-4.0282.2 Cross Slope (PAR)SF148299.6to $120 $17,7481586979ft
feet 5.0-6.0299.6 Cross Slope (PAR)SF87309.8to $120 $10,4041586989ft
feet 3.0-4.0311.6 Cross Slope (PAR)SF60318.7to $120 $7,2421586999ft
feet320.4 Driveway340.3to165996
feet 3.0-4.0344.2 Cross Slope (PAR)SF50350.1to $120 $6,0181587009ft
feet 2.0-3.0350.3 Cross Slope (PAR)SF97361.7to $120 $11,6281587019ft
feet 2.0-3.0367.9 Cross Slope (PAR)SF24370.7to $120 $2,8561587029ft
feet 2.0-3.0374.0 Cross Slope (PAR)SF23376.7to $120 $2,7541587039ft
feet376.7 Cold Patch 25379.6to140562 9 ft
feet376.7 Cold Patch 66384.5to140563 9 ft
feet -.47377.4 Vertical Change LF9378.4to $75 $6381383079ft
feet 2.0-3.0381.3 Cross Slope (PAR)SF27384.5to $120 $3,2641587049ft
$178,266.25TOTAL COST FOR:AYERS AVEN / E side of Starting at:4395 AYERS AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
461
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S AYERS AVE
Street Side
4398 AYERS AVE
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001170946
Run ID
Ayers Ave
88.25
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF546.4to $120 $6,5281588519ft
feet 3.0-4.08.5 Cross Slope (PAR)SF15827.1to $120 $18,9721588529ft
feet 2.0-3.027.1 Cross Slope (PAR)SF8737.3to $120 $10,4041588539ft
feet 3.0-4.041.3 Cross Slope (PAR)SF4947.1to $120 $5,9161588549ft
feet 2.0-3.047.9 Cross Slope (PAR)SF19570.8to $120 $23,3581588559ft
feet 2.0-3.073.4 Cross Slope (PAR)SF974.5to $120 $1,1221588569ft
feet 4.0-5.075.1 Cross Slope (PAR)SF10687.6to $120 $12,7501588579ft
feet 3.0-4.091.0 Cross Slope (PAR)SF5497.4to $120 $6,5281588589ft
feet 5.0-6.095.6 Running Slope REF2097.9to166632 9 ft
feet98.3 Driveway149.0to166004
feet .81135.5 Vertical Change REF9136.5to138356 9 ft
feet 5.0-6.0149.1 Cross Slope (Driveway)SF14150.8to $40 $5781588599ft
feet 3.0-4.0152.2 Cross Slope (PAR)SF9153.3to $120 $1,1221588609ft
feet 2.0-3.0155.0 Cross Slope (PAR)SF14156.6to $120 $1,6321588619ft
feet167.0 Driveway217.3to166005
feet .26225.9 Vertical Change REF9226.9to138357 9 ft
feet 2.0-3.0226.8 Cross Slope (PAR)SF14228.4to $120 $1,6321588629ft
feet 2.0-3.0232.8 Cross Slope (PAR)SF81242.3to $120 $9,6901588639ft
feet 2.0-3.0244.5 Cross Slope (PAR)SF11245.8to $120 $1,3261588649ft
feet245.8 Driveway275.7to166006
feet .28276.7 Vertical Change LF9277.7to $75 $6381383589ft
feet -.28279.5 Vertical Change LF9280.5to $75 $6381383599ft
feet .34282.4 Vertical Change LF25285.3to $75 $1,8491383609ft
feet -.26286.9 Vertical Change LF9287.9to $75 $6381383619ft
feet 2.0-3.0291.3 Cross Slope (PAR)SF10292.5to $120 $1,2241588659ft
feet -.26292.2 Vertical Change REF9293.2to138363 9 ft
feet 2.0-3.0297.4 Cross Slope (PAR)SF9298.5to $120 $1,1221588669ft
feet303.1 Driveway332.3to166007
feet 3.0-4.0334.1 Cross Slope (PAR)SF84344.0to $120 $10,0981588679ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
462
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S AYERS AVE
Street Side
4398 AYERS AVE
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001170946
Run ID
Ayers Ave
88.25
ID Sidewalk Width
Priority
feet 4.0-5.0347.5 Cross Slope (PAR)SF31351.2to $120 $3,7741588689ft
feet 2.0-3.0355.2 Cross Slope (PAR)SF46360.6to $120 $5,5081588699ft
feet 4.0-5.0361.0 Cross Slope (PAR)SF43366.1to $120 $5,2021588709ft
feet 2.0-3.0366.8 Cross Slope (PAR)SF153384.8to $120 $18,3601588719ft
feet 2.0-3.0388.6 Cross Slope (PAR)SF11389.9to $120 $1,3261588729ft
feet 2.0-3.0394.9 Cross Slope (PAR)SF17396.9to $120 $2,0401588739ft
feet404.2 Driveway433.5to166008
feet 2.0-3.0440.1 Cross Slope (PAR)SF17442.1to $120 $2,0401588749ft
feet445.0 Driveway474.1to166009
feet 2.0-3.0474.2 Cross Slope (Driveway)SF33478.1to $40 $1,3261588759ft
feet 4.0-5.0484.3 Cross Slope (PAR)SF40489.0to $120 $4,7941588769ft
feet 2.0-3.0489.0 Cross Slope (PAR)SF55495.5to $120 $6,6301588779ft
feet 2.0-3.0500.0 Cross Slope (PAR)SF115513.5to $120 $13,7701588789ft
feet513.5 Driveway537.8to166010
feet540.2 Driveway570.8to166011
feet 2.0-3.0570.8 Cross Slope (Driveway)SF9571.8to $40 $3401588799ft
feet 3.0-4.0576.8 Cross Slope (PAR)SF60583.9to $120 $7,2421588809ft
feet 1.1579.9 Vertical Change REF9580.9to138364 9 ft
feet 2.0-3.0583.9 Cross Slope (PAR)SF49589.7to $120 $5,9161588819ft
feet -.32584.7 Vertical Change REF9585.7to138365 9 ft
feet 2.0-3.0600.3 Cross Slope (PAR)SF38604.8to $120 $4,5901588829ft
feet -.51607.2 Vertical Change SF9608.2to $75 $6381383669ft
feet 3.0-4.0608.5 Cross Slope (PAR)SF35612.6to $120 $4,1821588839ft
feet 5.0-6.0612.6 Cross Slope (PAR)SF24615.4to $120 $2,8561588849ft
feet 3.0-4.0615.6 Cross Slope (PAR)SF26618.6to $120 $3,0601588859ft
feet618.6 Driveway670.5to166012
feet .26622.6 Vertical Change REF25625.5to138367 9 ft
feet .28630.6 Vertical Change REF9631.6to138368 9 ft
feet .3660.0 Vertical Change REF9661.0to138369 9 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
463
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S AYERS AVE
Street Side
4398 AYERS AVE
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001170946
Run ID
Ayers Ave
88.25
ID Sidewalk Width
Priority
feet -.37690.6 Vertical Change LF9691.6to $75 $6381383709ft
feet 2.0-3.0696.9 Cross Slope (PAR)SF26699.9to $120 $3,0601588869ft
feet 2.0-3.0709.5 Cross Slope (PAR)SF35713.6to $120 $4,1821588879ft
feet 2.0-3.0718.5 Cross Slope (PAR)SF9719.6to $120 $1,1221588889ft
feet 2.0-3.0732.3 Cross Slope (PAR)SF24735.1to $120 $2,8561588899ft
feet 2.0-3.0747.8 Cross Slope (PAR)SF114761.2to $120 $13,6681588909ft
feet765.6 Driveway809.3to166013
feet 2.0-3.0809.3 Cross Slope (Driveway)SF9810.4to $40 $3741588919ft
feet 2.0-3.0817.9 Cross Slope (PAR)SF9819.0to $120 $1,1221588929ft
feet 2.0-3.0827.7 Cross Slope (PAR)SF71836.1to $120 $8,5681588939ft
feet 2.0-3.0842.1 Cross Slope (PAR)SF10843.3to $120 $1,2241588949ft
feet 2.0-3.0847.0 Cross Slope (PAR)SF45852.3to $120 $5,4061588959ft
feet 2.0-3.0854.7 Cross Slope (PAR)SF29858.1to $120 $3,4681588969ft
feet 2.0-3.0863.5 Cross Slope (PAR)SF9864.6to $120 $1,1221588979ft
feet 2.0-3.0867.9 Cross Slope (PAR)SF167887.5to $120 $19,9921588989ft
feet 3.0-4.0889.7 Cross Slope (PAR)SF15891.5to $120 $1,8361588999ft
feet 2.0-3.0892.8 Cross Slope (PAR)SF335932.2to $120 $40,1881589009ft
feet .29914.4 Vertical Change REF9915.4to138371 9 ft
feet 2.0-3.0945.2 Cross Slope (PAR)SF26948.3to $120 $3,1621589019ft
feet948.3 Driveway988.8to166014
feet948.3 Driveway1253.0to166015
feet -.44985.3 Vertical Change REF9986.3to138372 9 ft
feet 3.0-4.0988.8 Cross Slope (Driveway)SF17990.8to $40 $6801589029ft
feet 2.0-3.0990.8 Cross Slope (Driveway)SF19993.0to $40 $7481589039ft
feet -.28991.7 Vertical Change REF9992.7to138373 9 ft
feet .28998.9 Vertical Change REF9999.9to138374 9 ft
feet .381002.9 Vertical Change REF91003.9to138375 9 ft
feet 2.0-3.01004.7 Cross Slope (Driveway)SF331008.6to $40 $1,3261589049ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
464
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S AYERS AVE
Street Side
4398 AYERS AVE
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001170946
Run ID
Ayers Ave
88.25
ID Sidewalk Width
Priority
feet 5.0-6.01010.6 Cross Slope (Driveway)SF261013.6to $40 $1,0201589059ft
feet 2.0-3.01015.3 Cross Slope (Driveway)SF391019.9to $40 $1,5641589069ft
feet 3.0-4.01022.1 Cross Slope (Driveway)SF131023.6to $40 $5101589079ft
feet 2.0-3.01044.5 Cross Slope (Driveway)SF371048.9to $40 $1,4961589089ft
feet 4.0-5.01053.3 Cross Slope (Driveway)SF91054.3to $40 $3401589099ft
feet 3.0-4.01057.0 Cross Slope (Driveway)SF451062.3to $40 $1,8021589109ft
feet 3.0-4.01067.3 Cross Slope (Driveway)SF1841089.0to $40 $7,3781589119ft
feet 4.0-5.01091.5 Cross Slope (Driveway)SF651099.1to $40 $2,5841589129ft
feet .291095.6 Vertical Change REF91096.6to138376 9 ft
feet 4.0-5.01101.3 Cross Slope (Driveway)SF191103.5to $40 $7481589139ft
feet 3.0-4.01105.8 Cross Slope (Driveway)SF291109.2to $40 $1,1561589149ft
feet 2.0-3.01111.3 Cross Slope (Driveway)SF891121.8to $40 $3,5701589159ft
feet .331115.4 Vertical Change REF301118.9to138377 9 ft
feet -.471120.1 Vertical Change REF91121.1to138378 9 ft
feet .281122.0 Vertical Change REF291125.4to138379 9 ft
feet 2.971126.7 Vertical Change REF91127.7to138380 9 ft
feet 4.0-5.01129.9 Cross Slope (Driveway)SF751138.7to $40 $2,9921589169ft
feet 5.0-6.01141.9 Cross Slope (Driveway)SF1151155.4to $40 $4,5901589179ft
feet 2.0-3.01155.8 Cross Slope (Driveway)SF1051168.1to $40 $4,1821589189ft
feet 3.0-4.01170.5 Cross Slope (Driveway)SF671178.4to $40 $2,6861589199ft
feet .281175.8 Vertical Change REF91176.8to138381 9 ft
feet 2.0-3.01180.3 Cross Slope (Driveway)SF821190.0to $40 $3,2981589209ft
feet 2.0-3.01192.7 Cross Slope (Driveway)SF481198.4to $40 $1,9381589219ft
feet 2.0-3.01204.7 Cross Slope (Driveway)SF361208.9to $40 $1,4281589229ft
feet 3.0-4.01211.6 Cross Slope (Driveway)SF1751232.2to $40 $7,0041589239ft
feet 4.0-5.01238.6 Cross Slope (Driveway)SF211241.1to $40 $8501589249ft
feet 6.0-7.01241.1 Cross Slope (Driveway)SF331245.0to $40 $1,3261589259ft
feet 5.0-6.01245.0 Cross Slope (Driveway)SF101246.2to $40 $4081589269ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
465
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S AYERS AVE
Street Side
4398 AYERS AVE
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001170946
Run ID
Ayers Ave
88.25
ID Sidewalk Width
Priority
feet 3.0-4.01247.2 Cross Slope (Driveway)SF411252.0to $40 $1,6321589279ft
feet 5.0-6.01250.0 Running Slope REF201252.3to166633 9 ft
$380,600.25TOTAL COST FOR:AYERS AVESside of Starting at:4398 AYERS AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
466
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161015
Run ID
Ayers Ave
88.25
ID Sidewalk Width
Priority
feet 5.0-6.00.1 Cross Slope (PAR)SF163.6to $120 $1,8901576865ft
feet 6.0-7.04.0 Cross Slope (PAR)SF228.8to $120 $2,5921576875ft
feet 4.0-5.011.7 Cross Slope (PAR)SF813.5to $120 $9721576885ft
feet 6.0-7.015.4 Cross Slope (PAR)SF3322.8to $120 $3,9961576895ft
feet 5.0-6.022.8 Cross Slope (PAR)SF3330.2to $120 $3,9961576905ft
feet 3.0-4.031.0 Cross Slope (PAR)SF1835.1to $120 $2,2141576915ft
feet 2.0-3.038.5 Cross Slope (PAR)SF1241.1to $120 $1,4041576925ft
feet43.8 Continuous Width REF544.8to167236 5 ft
feet 3.0-4.045.2 Cross Slope (PAR)SF1849.2to $120 $2,1601576935ft
feet -.4645.7 Vertical Change REF546.7to138073 5 ft
feet .3247.9 Vertical Change REF548.9to138074 5 ft
feet 2.0-3.053.3 Cross Slope (PAR)SF2458.6to $120 $2,8621576945ft
feet 2.0-3.062.7 Cross Slope (Driveway)SF1967.0to $40 $7741576955ft
feet 3.0-4.074.4 Cross Slope (Driveway)SF1878.3to $40 $7021576965ft
feet 2.0-3.085.3 Cross Slope (Driveway)SF2691.1to $40 $1,0441576975ft
feet 4.0-5.091.1 Cross Slope (Driveway)SF60104.4to $40 $2,3941576985ft
feet 2.0-3.0107.2 Cross Slope (PAR)SF43116.7to $120 $5,1301576995ft
feet 3.0-4.0124.7 Cross Slope (PAR)SF19129.0to $120 $2,3221577005ft
feet 2.0-3.0131.1 Cross Slope (PAR)SF35138.8to $120 $4,1581577015ft
feet 1.9139.9 Vertical Change SF5140.9to $75 $3381380765ft
feet 3.0-4.0143.5 Cross Slope (PAR)SF20147.9to $120 $2,3761577025ft
feet 4.0-5.0150.3 Cross Slope (PAR)SF47160.7to $120 $5,6161577035ft
feet153.3 Continuous Width REF5154.3to167237 5 ft
feet 2.0-3.0160.7 Cross Slope (PAR)SF35168.4to $120 $4,1581577045ft
feet 3.0-4.0171.0 Cross Slope (PAR)SF10173.3to $120 $1,2421577055ft
feet 3.0-4.0178.8 Cross Slope (PAR)SF14181.8to $120 $1,6201577065ft
feet 2.0-3.0182.7 Cross Slope (PAR)SF48193.3to $120 $5,7241577075ft
feet 3.0-4.0199.0 Cross Slope (PAR)SF9200.9to $120 $1,0261577085ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
467
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161015
Run ID
Ayers Ave
88.25
ID Sidewalk Width
Priority
feet 3.0-4.0204.8 Cross Slope (PAR)SF11207.2to $120 $1,2961577095ft
feet 2.0-3.0208.2 Cross Slope (PAR)SF123235.5to $120 $14,7421577105ft
feet 4.0-5.0236.4 Cross Slope (PAR)SF25242.0to $120 $3,0241577115ft
feet242.3 Continuous Width SF5243.3to $120 $5401668245ft
feet 4.0-5.0246.1 Cross Slope (PAR)SF75262.7to $120 $8,9641577125ft
feet 4.0-5.0264.8 Cross Slope (PAR)SF16268.4to $120 $1,9441577135ft
feet 3.0-4.0271.3 Cross Slope (PAR)SF12273.9to $120 $1,4041577145ft
feet 5.0-6.0274.1 Cross Slope (PAR)SF5275.3to $120 $6481577155ft
feet 6.0-7.0275.3 Cross Slope (PAR)SF6276.6to $120 $7021577165ft
feet 5.0-6.0277.6 Cross Slope (PAR)SF25283.1to $120 $2,9701577175ft
feet 3.0-4.0284.8 Cross Slope (PAR)SF11287.2to $120 $1,2961577185ft
feet 2.0-3.0289.0 Cross Slope (PAR)SF81307.0to $120 $9,7201577195ft
feet 4.0-5.0307.6 Cross Slope (PAR)SF6308.9to $120 $7021577205ft
feet .32311.9 Vertical Change LF5312.9to $75 $3381380775ft
feet 3.0-4.0314.3 Cross Slope (PAR)SF6315.7to $120 $7561577215ft
feet 3.0-4.0318.9 Cross Slope (PAR)SF5319.9to $120 $5401577225ft
feet 4.0-5.0322.3 Cross Slope (PAR)SF42331.6to $120 $5,0221577235ft
feet 5.0-6.0329.0 Running Slope REF5330.1to166609 5 ft
feet331.6 Cold Patch 7333.2to140557 5 ft
feet 7.0-8.0334.0 Cross Slope (PAR)SF24339.3to $120 $2,8621577245ft
feet 5.0-6.0339.8 Cross Slope (PAR)SF9341.7to $120 $1,0261577255ft
feet 3.0-4.0343.3 Cross Slope (PAR)SF6344.6to $120 $7021577265ft
feet 2.0-3.0344.6 Cross Slope (PAR)SF26350.4to $120 $3,1321577275ft
feet 2.73347.2 Vertical Change REF5348.2to138078 5 ft
$123,039.00TOTAL COST FOR:AYERS AVESWside of Starting at:BANDINI BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
468
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W / N AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
4395 AYERS AVE
End Street Name
2001171001
Run ID
Ayers Ave
81
ID Sidewalk Width
Priority
feet 4.0-5.00.3 Cross Slope (PAR)SF11113.3to $120 $13,2601587059ft
feet 3.0-4.016.3 Cross Slope (PAR)SF6824.3to $120 $8,1601587069ft
feet 2.0-3.027.2 Cross Slope (PAR)SF6935.3to $120 $8,2621587079ft
feet 3.0-4.042.0 Cross Slope (PAR)SF1543.8to $120 $1,8361587089ft
feet 2.0-3.044.6 Cross Slope (PAR)SF1045.8to $120 $1,2241587099ft
feet 2.0-3.048.8 Cross Slope (PAR)SF16267.9to $120 $19,4821587109ft
feet 2.0-3.070.8 Cross Slope (PAR)SF4275.7to $120 $4,9981587119ft
feet 3.0-4.077.8 Cross Slope (PAR)SF16697.3to $120 $19,8901587129ft
feet 2.0-3.0102.6 Cross Slope (PAR)SF14104.2to $120 $1,6321587139ft
feet 3.0-4.0106.9 Cross Slope (PAR)SF56113.5to $120 $6,7321587149ft
feet 2.0-3.0113.5 Cross Slope (PAR)SF79122.8to $120 $9,4861587159ft
feet 2.0-3.0127.3 Cross Slope (PAR)SF13128.8to $120 $1,5301587169ft
feet 4.0-5.0131.8 Cross Slope (PAR)SF13133.3to $120 $1,5301587179ft
feet 2.0-3.0133.8 Cross Slope (PAR)SF9134.8to $120 $1,0201587189ft
feet 2.0-3.0141.7 Cross Slope (PAR)SF43146.8to $120 $5,2021587199ft
feet 3.0-4.0152.1 Cross Slope (PAR)SF10153.3to $120 $1,2241587209ft
feet 5.0-6.0154.4 Cross Slope (PAR)SF82164.0to $120 $9,7921587219ft
feet 2.0-3.0165.1 Cross Slope (PAR)SF65172.7to $120 $7,7521587229ft
feet 4.0-5.0172.7 Cross Slope (PAR)SF118186.6to $120 $14,1781587239ft
feet -.3187.3 Vertical Change LF9188.3to $75 $6381383089ft
feet 5.0-6.0188.8 Cross Slope (PAR)SF22191.4to $120 $2,6521587249ft
feet 5.0-6.0197.5 Cross Slope (PAR)SF20199.9to $120 $2,4481587259ft
feet -.26199.5 Vertical Change REF48205.2to138309 9 ft
feet 3.0-4.0200.5 Cross Slope (PAR)SF10201.7to $120 $1,2241587269ft
feet 2.0-3.0205.8 Cross Slope (PAR)SF47211.3to $120 $5,6101587279ft
feet .26206.1 Vertical Change REF62213.4to138310 9 ft
feet -.33216.9 Vertical Change LF9217.9to $75 $6381383119ft
feet 4.0-5.0218.7 Cross Slope (PAR)SF22221.3to $120 $2,6521587289ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
469
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W / N AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
4395 AYERS AVE
End Street Name
2001171001
Run ID
Ayers Ave
81
ID Sidewalk Width
Priority
feet -.26220.5 Vertical Change REF9221.5to138312 9 ft
feet 2.0-3.0221.7 Cross Slope (PAR)SF18223.8to $120 $2,1421587299ft
feet -.5224.9 Vertical Change SF9225.9to $75 $6381383139ft
feet 3.0-4.0229.3 Cross Slope (PAR)SF34233.3to $120 $4,0801587309ft
feet 2.0-3.0233.9 Cross Slope (PAR)SF63241.3to $120 $7,5481587319ft
feet 2.0-3.0243.7 Cross Slope (PAR)SF31247.3to $120 $3,6721587329ft
feet 2.0-3.0252.3 Cross Slope (PAR)SF9253.4to $120 $1,1221587339ft
feet 2.0-3.0256.3 Cross Slope (PAR)SF115269.8to $120 $13,7701587349ft
feet -.46264.8 Vertical Change REF9265.8to138314 9 ft
feet 3.0-4.0272.5 Cross Slope (PAR)SF11273.8to $120 $1,3261587359ft
feet 2.0-3.0274.5 Cross Slope (PAR)SF11275.8to $120 $1,3261587369ft
feet 2.0-3.0281.9 Cross Slope (PAR)SF17283.9to $120 $2,0401587379ft
feet 2.0-3.0288.9 Cross Slope (PAR)SF246317.8to $120 $29,4781587389ft
feet318.2 Driveway359.3to165997
feet .39365.4 Vertical Change LF9366.4to $75 $6381383159ft
feet -.26367.7 Vertical Change LF9368.7to $75 $6381383169ft
feet 2.0-3.0369.4 Cross Slope (PAR)SF31373.0to $120 $3,6721587399ft
feet .27369.6 Vertical Change REF24372.4to138317 9 ft
feet -.28373.4 Vertical Change LF9374.4to $75 $6381383189ft
feet .26375.6 Vertical Change REF79384.9to138319 9 ft
feet 2.0-3.0376.4 Cross Slope (PAR)SF10377.6to $120 $1,2241587409ft
feet 4.0-5.0379.4 Cross Slope (PAR)SF88389.8to $120 $10,6081587419ft
feet 2.0-3.0390.9 Cross Slope (PAR)SF27394.1to $120 $3,2641587429ft
feet 4.0-5.0394.5 Cross Slope (PAR)SF100406.3to $120 $12,0361587439ft
feet 4.0-5.0409.2 Cross Slope (PAR)SF77418.2to $120 $9,1801587449ft
feet 6.0-7.0419.9 Cross Slope (PAR)SF18422.0to $120 $2,1421587459ft
feet 5.0-6.0423.0 Cross Slope (PAR)SF22425.6to $120 $2,6521587469ft
feet 3.0-4.0425.8 Cross Slope (PAR)SF21428.3to $120 $2,5501587479ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
470
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W / N AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
4395 AYERS AVE
End Street Name
2001171001
Run ID
Ayers Ave
81
ID Sidewalk Width
Priority
feet 2.0-3.0428.5 Cross Slope (PAR)SF13430.0to $120 $1,5301587489ft
feet 5.0-6.0432.5 Cross Slope (PAR)SF50438.4to $120 $6,0181587499ft
feet 3.0-4.0438.4 Cross Slope (PAR)SF20440.7to $120 $2,3461587509ft
feet 4.0-5.0444.3 Cross Slope (PAR)SF31448.0to $120 $3,7741587519ft
feet 2.0-3.0448.0 Cross Slope (PAR)SF133463.6to $120 $15,9121587529ft
feet .48464.5 Vertical Change LF27467.7to $75 $2,0401383209ft
feet 4.0-5.0465.8 Cross Slope (PAR)SF26468.9to $120 $3,1621587539ft
feet .3470.5 Vertical Change LF9471.5to $75 $6381383219ft
feet 3.0-4.0475.1 Cross Slope (PAR)SF78484.3to $120 $9,3841587549ft
feet 2.0-3.0485.8 Cross Slope (PAR)SF82495.4to $120 $9,7921587559ft
feet 2.0-3.0497.6 Cross Slope (PAR)SF129512.8to $120 $15,5041587569ft
feet 1.26501.5 Vertical Change REF9502.5to138322 9 ft
feet 4.0-5.0516.7 Cross Slope (PAR)SF56523.3to $120 $6,7321587579ft
feet 4.0-5.0526.0 Cross Slope (PAR)SF11527.3to $120 $1,3261587589ft
feet528.3 Cold Patch 37532.7to140564 9 ft
feet .33529.2 Vertical Change LF23531.9to $75 $1,7211383239ft
feet 5.0-6.0533.9 Cross Slope (PAR)SF128548.9to $120 $15,3001587599ft
feet 3.0-4.0550.5 Cross Slope (PAR)SF45555.8to $120 $5,4061587609ft
feet .38551.1 Vertical Change REF9552.1to138324 9 ft
feet558.3 Cold Patch 50564.2to140565 9 ft
feet 3.0-4.0566.0 Cross Slope (PAR)SF9567.0to $120 $1,0201587619ft
feet 7.0-8.0568.9 Cross Slope (PAR)SF20571.2to $120 $2,3461587629ft
feet 5.0-6.0574.8 Cross Slope (PAR)SF26577.9to $120 $3,1621587639ft
feet 3.0-4.0578.3 Cross Slope (PAR)SF9579.3to $120 $1,0201587649ft
feet 2.0-3.0583.5 Cross Slope (PAR)SF31587.2to $120 $3,7741587659ft
feet .28587.3 Vertical Change LF9588.3to $75 $6381383259ft
feet 3.0-4.0591.8 Cross Slope (PAR)SF11593.1to $120 $1,3261587669ft
feet .28593.7 Vertical Change REF9594.7to138326 9 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
471
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W / N AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
4395 AYERS AVE
End Street Name
2001171001
Run ID
Ayers Ave
81
ID Sidewalk Width
Priority
feet 2.0-3.0594.3 Cross Slope (PAR)SF10595.5to $120 $1,2241587679ft
feet -.27596.7 Vertical Change LF9597.7to $75 $6381383279ft
feet .73600.4 Vertical Change REF9601.4to138328 9 ft
feet 3.0-4.0600.9 Cross Slope (PAR)SF13602.4to $120 $1,5301587689ft
feet 2.0-3.0629.7 Cross Slope (PAR)SF19631.9to $120 $2,2441587699ft
feet -.36633.4 Vertical Change LF9634.4to $75 $6381383299ft
feet 3.0-4.0639.2 Cross Slope (PAR)SF33643.1to $120 $3,9781587709ft
feet 2.0-3.0644.3 Cross Slope (PAR)SF31647.9to $120 $3,6721587719ft
feet 2.0-3.0658.4 Cross Slope (PAR)SF59665.3to $120 $7,0381587729ft
feet 2.0-3.0675.4 Cross Slope (PAR)SF136691.4to $120 $16,3201587739ft
feet 4.0-5.0691.4 Cross Slope (PAR)SF129706.6to $120 $15,5041587749ft
feet 2.0-3.0706.6 Cross Slope (PAR)SF109719.4to $120 $13,0561587759ft
feet 2.0-3.0735.0 Cross Slope (PAR)SF61742.2to $120 $7,3441587769ft
feet 4.0-5.0743.3 Cross Slope (PAR)SF71751.6to $120 $8,4661587779ft
feet 2.0-3.0751.6 Cross Slope (PAR)SF29755.0to $120 $3,4681587789ft
feet 3.11754.0 Vertical Change REF9755.0to138330 9 ft
feet 4.0-5.0756.3 Cross Slope (PAR)SF10757.5to $120 $1,2241587799ft
feet -.28758.9 Vertical Change REF9759.9to138331 9 ft
feet 2.0-3.0759.1 Cross Slope (PAR)SF14760.8to $120 $1,7341587809ft
feet .27760.8 Vertical Change REF9761.8to138332 9 ft
feet -.33763.4 Vertical Change LF9764.4to $75 $6381383339ft
feet .32765.7 Vertical Change LF9766.7to $75 $6381383349ft
feet .27770.0 Vertical Change LF9771.0to $75 $6381383369ft
feet 2.0-3.0781.8 Cross Slope (PAR)SF48787.4to $120 $5,7121587819ft
feet 3.0-4.0792.3 Cross Slope (PAR)SF110805.2to $120 $13,1581587829ft
feet 2.0-3.0807.9 Cross Slope (PAR)SF12809.3to $120 $1,4281587839ft
feet 4.0-5.0810.3 Cross Slope (PAR)SF26813.3to $120 $3,0601587849ft
feet 2.0-3.0813.4 Cross Slope (PAR)SF47818.9to $120 $5,6101587859ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
472
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W / N AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
4395 AYERS AVE
End Street Name
2001171001
Run ID
Ayers Ave
81
ID Sidewalk Width
Priority
feet 2.0-3.0821.5 Cross Slope (PAR)SF45826.8to $120 $5,4061587869ft
feet 2.0-3.0831.3 Cross Slope (PAR)SF30834.8to $120 $3,5701587879ft
feet -.32849.1 Vertical Change LF9850.1to $75 $6381383379ft
feet .28851.3 Vertical Change LF24854.1to $75 $1,7851383389ft
feet -.29856.7 Vertical Change LF9857.7to $75 $6381383399ft
feet .28858.9 Vertical Change LF9859.9to $75 $6381383409ft
feet -.26861.6 Vertical Change LF9862.6to $75 $6381383419ft
feet 2.0-3.0863.2 Cross Slope (PAR)SF128878.3to $120 $15,4021587889ft
feet .26863.7 Vertical Change REF30867.2to138342 9 ft
feet -.27869.6 Vertical Change REF9870.6to138343 9 ft
feet .46879.9 Vertical Change LF9880.9to $75 $6381383449ft
feet880.8 Driveway919.3to165998
feet 2.0-3.0924.4 Cross Slope (PAR)SF21926.9to $120 $2,5501587899ft
feet930.7 Driveway958.5to165999
feet930.7 Driveway1116.6to166000
feet 2.0-3.0961.5 Cross Slope (Driveway)SF11962.8to $40 $4421587909ft
feet 3.0-4.0966.6 Cross Slope (Driveway)SF10967.8to $40 $4081587919ft
feet 2.0-3.0968.3 Cross Slope (Driveway)SF34972.3to $40 $1,3601587929ft
feet 2.0-3.0978.6 Cross Slope (Driveway)SF43983.7to $40 $1,7341587939ft
feet 2.0-3.0987.3 Cross Slope (Driveway)SF64994.8to $40 $2,5501587949ft
feet 2.0-3.0996.9 Cross Slope (Driveway)SF1281012.0to $40 $5,1341587959ft
feet 3.0-4.01015.9 Cross Slope (Driveway)SF191018.1to $40 $7481587969ft
feet 2.0-3.01018.4 Cross Slope (Driveway)SF961029.7to $40 $3,8421587979ft
feet .321026.8 Vertical Change REF91027.8to138345 9 ft
feet .381030.8 Vertical Change REF91031.8to138346 9 ft
feet .271033.9 Vertical Change REF531040.1to138347 9 ft
feet 3.0-4.01038.5 Cross Slope (Driveway)SF91039.6to $40 $3741587989ft
feet 5.0-6.01040.5 Cross Slope (Driveway)SF561047.1to $40 $2,2441587999ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
473
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W / N AYERS AVE
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
4395 AYERS AVE
End Street Name
2001171001
Run ID
Ayers Ave
81
ID Sidewalk Width
Priority
feet 3.0-4.01048.7 Cross Slope (Driveway)SF521054.8to $40 $2,0741588009ft
feet 4.0-5.01057.3 Cross Slope (Driveway)SF291060.7to $40 $1,1561588019ft
feet 2.0-3.01066.1 Cross Slope (Driveway)SF91067.2to $40 $3741588029ft
feet 2.0-3.01069.8 Cross Slope (Driveway)SF101071.0to $40 $4081588039ft
feet 2.0-3.01073.2 Cross Slope (Driveway)SF1391089.5to $40 $5,5421588049ft
feet 4.0-5.01090.3 Cross Slope (Driveway)SF91091.3to $40 $3401588059ft
feet 2.0-3.01092.3 Cross Slope (Driveway)SF91093.3to $40 $3401588069ft
feet 5.0-6.01103.1 Cross Slope (Driveway)SF481108.8to $40 $1,9381588079ft
feet 3.0-4.01109.3 Cross Slope (Driveway)SF601116.3to $40 $2,3801588089ft
$567,549.25TOTAL COST FOR:AYERS AVEW / N side of Starting at:BANDINI BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
474
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE AYERS AVE
Street Side
E 26TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161001
Run ID
Ayers Ave
72.25
ID Sidewalk Width
Priority
feet 6.0-7.01.1 Cross Slope (PAR)SF103.3to $120 $1,1881577655ft
feet 7.0-8.06.5 Cross Slope (PAR)SF2912.9to $120 $3,4561577665ft
feet 7.0-8.015.7 Cross Slope (PAR)SF917.8to $120 $1,1341577675ft
feet 5.0-6.018.8 Cross Slope (PAR)SF520.0to $120 $6481577685ft
feet 2.0-3.021.3 Cross Slope (PAR)SF9542.3to $120 $11,3401577695ft
feet21.4 Continuous Width SF522.4to $120 $5401669235ft
feet -.2732.3 Vertical Change REF533.3to138085 5 ft
feet38.8 Continuous Width SF539.8to $120 $5401674315ft
feet -.2740.9 Vertical Change REF541.9to138086 5 ft
feet 4.0-5.042.3 Cross Slope (PAR)SF1645.8to $120 $1,8901577705ft
feet 2.0-3.045.8 Cross Slope (PAR)SF2451.2to $120 $2,9161577715ft
feet 4.0-5.051.9 Cross Slope (PAR)SF1555.2to $120 $1,7821577725ft
feet58.9 Driveway100.4to165924
feet -.2790.3 Vertical Change REF591.3to138087 5 ft
feet 2.0-3.0101.3 Cross Slope (PAR)SF74117.7to $120 $8,8561577735ft
feet -.33108.2 Vertical Change REF5109.2to138088 5 ft
feet108.8 Continuous Width SF5109.8to $120 $5401670965ft
feet 3.0-4.0121.1 Cross Slope (PAR)SF5122.2to $120 $5941577745ft
feet 2.0-3.0122.2 Cross Slope (PAR)SF37130.4to $120 $4,4281577755ft
feet 4.0-5.0131.6 Cross Slope (PAR)SF28137.8to $120 $3,3481577765ft
feet 2.0-3.0137.8 Cross Slope (PAR)SF7139.4to $120 $8641577775ft
feet 4.0-5.0140.6 Cross Slope (PAR)SF19144.8to $120 $2,2681577785ft
feet144.3 Continuous Width SF5145.3to $120 $5401670975ft
feet 2.0-3.0144.8 Cross Slope (PAR)SF9146.9to $120 $1,1341577795ft
feet 2.0-3.0149.1 Cross Slope (PAR)SF5150.2to $120 $5941577805ft
feet 4.0-5.0152.2 Cross Slope (PAR)SF35159.9to $120 $4,1581577815ft
feet 2.0-3.0160.8 Cross Slope (PAR)SF14164.0to $120 $1,7281577825ft
feet165.4 Continuous Width SF5166.4to $120 $5401674325ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
475
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE AYERS AVE
Street Side
E 26TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161001
Run ID
Ayers Ave
72.25
ID Sidewalk Width
Priority
feet 3.0-4.0166.8 Cross Slope (PAR)SF61180.3to $120 $7,2901577835ft
feet .28167.0 Vertical Change REF5168.0to138089 5 ft
feet -.3170.2 Vertical Change REF5171.2to138090 5 ft
feet .49177.2 Vertical Change REF5178.2to138091 5 ft
feet 5.0-6.0180.3 Cross Slope (PAR)SF61193.9to $120 $7,3441577845ft
feet 4.0-5.0196.4 Cross Slope (PAR)SF21201.0to $120 $2,4841577855ft
feet 4.0-5.0204.8 Cross Slope (PAR)SF25210.3to $120 $2,9701577865ft
feet 5.0-6.0213.1 Cross Slope (PAR)SF56225.5to $120 $6,6961577875ft
feet -.27221.0 Vertical Change REF5222.0to138092 5 ft
feet 3.0-4.0227.4 Cross Slope (PAR)SF38235.9to $120 $4,5901577885ft
feet 5.0-6.0236.6 Cross Slope (PAR)SF5237.7to $120 $5941577895ft
feet 6.0-7.0238.0 Cross Slope (PAR)SF15241.4to $120 $1,8361577905ft
feet 5.0-6.0241.4 Cross Slope (PAR)SF20245.9to $120 $2,4301577915ft
feet 6.0-7.0246.3 Cross Slope (PAR)SF10248.5to $120 $1,1881577925ft
feet 4.0-5.0249.6 Cross Slope (PAR)SF87269.0to $120 $10,4761577935ft
feet -.26263.9 Vertical Change REF5264.9to138093 5 ft
feet 4.0-5.0271.9 Cross Slope (PAR)SF124299.5to $120 $14,9041577945ft
feet .31294.8 Vertical Change REF5295.8to138094 5 ft
feet 2.0-3.0302.3 Cross Slope (PAR)SF9304.4to $120 $1,1341577955ft
feet307.3 Continuous Width SF5308.3to $120 $5401674875ft
feet 4.0-5.0309.0 Cross Slope (PAR)SF5310.0to $120 $5401577965ft
feet 5.0-6.0312.0 Running Slope SF6313.3to $120 $7021666115ft
feet 3.0-4.0315.9 Cross Slope (PAR)SF6317.3to $120 $7561577975ft
feet .27321.6 Vertical Change REF5322.6to138095 5 ft
feet 4.0-5.0322.2 Cross Slope (PAR)SF9324.3to $120 $1,1341577985ft
feet 3.0-4.0327.2 Cross Slope (PAR)SF55339.5to $120 $6,6421577995ft
feet 5.0-6.0339.5 Cross Slope (PAR)SF47350.0to $120 $5,6701578005ft
feet 3.0-4.0350.0 Cross Slope (PAR)SF5351.0to $120 $5401578015ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
476
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE AYERS AVE
Street Side
E 26TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161001
Run ID
Ayers Ave
72.25
ID Sidewalk Width
Priority
feet 2.0-3.0352.1 Cross Slope (PAR)SF12354.8to $120 $1,4581578025ft
feet 2.0-3.0357.3 Cross Slope (PAR)SF55369.5to $120 $6,5881578035ft
feet 5.0-6.0368.3 Running Slope REF5369.3to166612 5 ft
$143,532.00TOTAL COST FOR:AYERS AVENEside of Starting at:E 26TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
477
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S AYERS AVE
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
4398 AYERS AVE
End Street Name
2001171123
Run ID
Ayers Ave
42.75
ID Sidewalk Width
Priority
feet .31.4 Vertical Change REF92.4to138176 9 ft
feet 3.0-4.01.5 Cross Slope (PAR)SF92.6to $120 $1,1221582439ft
feet 2.0-3.09.1 Cross Slope (PAR)SF4414.3to $120 $5,3041582449ft
feet18.6 Driveway42.8to165963
feet .3124.3 Vertical Change REF925.3to138177 9 ft
feet 3.0-4.043.0 Cross Slope (Driveway)SF2145.5to $40 $8501582459ft
feet 2.0-3.046.4 Cross Slope (PAR)SF29080.5to $120 $34,7821582469ft
feet .2766.5 Vertical Change REF967.5to138178 9 ft
feet 4.0-5.080.5 Cross Slope (PAR)SF4585.8to $120 $5,4061582479ft
feet 5.0-6.084.3 Running Slope REF1485.9to166624 9 ft
feet86.6 Driveway134.2to165964
feet .37121.7 Vertical Change REF9122.7to138179 9 ft
feet 3.0-4.0135.4 Cross Slope (PAR)SF37139.7to $120 $4,3861582489ft
feet 2.0-3.0145.2 Cross Slope (PAR)SF13146.7to $120 $1,5301582499ft
feet 4.0-5.0147.3 Cross Slope (PAR)SF15149.1to $120 $1,8361582509ft
feet 3.0-4.0152.3 Cross Slope (PAR)SF20154.6to $120 $2,3461582519ft
feet 3.0-4.0156.9 Cross Slope (PAR)SF63164.3to $120 $7,5481582529ft
feet 2.0-3.0164.3 Cross Slope (PAR)SF82173.9to $120 $9,7921582539ft
feet 2.0-3.0176.0 Cross Slope (PAR)SF10177.2to $120 $1,2241582549ft
feet 2.0-3.0180.2 Cross Slope (PAR)SF17182.2to $120 $2,0401582559ft
feet 2.0-3.0188.1 Cross Slope (PAR)SF215213.4to $120 $25,8061582569ft
feet 2.0-3.0219.1 Cross Slope (PAR)SF165238.5to $120 $19,7881582579ft
feet 3.0-4.0241.3 Cross Slope (PAR)SF85251.3to $120 $10,2001582589ft
feet 2.49250.3 Vertical Change REF9251.3to138180 9 ft
feet 2.0-3.0252.9 Cross Slope (PAR)SF241281.2to $120 $28,8661582599ft
feet 2.0-3.0284.8 Cross Slope (PAR)SF9285.8to $120 $1,0201582609ft
feet 2.0-3.0289.3 Cross Slope (PAR)SF82298.9to $120 $9,7921582619ft
feet 3.0-4.0304.3 Cross Slope (PAR)SF97315.7to $120 $11,6281582629ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
478
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S AYERS AVE
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
4398 AYERS AVE
End Street Name
2001171123
Run ID
Ayers Ave
42.75
ID Sidewalk Width
Priority
feet 4.0-5.0318.1 Cross Slope (PAR)SF151335.9to $120 $18,1561582639ft
feet -.35335.1 Vertical Change REF9336.1to138181 9 ft
feet 5.0-6.0338.0 Cross Slope (PAR)SF24340.8to $120 $2,8561582649ft
feet .26339.4 Vertical Change REF9340.4to138182 9 ft
feet 3.0-4.0342.8 Cross Slope (PAR)SF11344.1to $120 $1,3261582659ft
feet 2.0-3.0344.1 Cross Slope (PAR)SF255374.1to $120 $30,6001582669ft
feet 5.0-6.0371.7 Running Slope REF20374.1to166625 9 ft
$238,204.00TOTAL COST FOR:AYERS AVESside of Starting at:S SUNOL DR
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
479
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE AYERS AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161006
Run ID
Ayers Ave
98.25
ID Sidewalk Width
Priority
feet 4.0-5.01.6 Cross Slope (PAR)SF7618.5to $120 $9,1261577285ft
feet 2.0-3.018.5 Cross Slope (PAR)SF1922.8to $120 $2,3221577295ft
feet 4.0-5.023.8 Cross Slope (PAR)SF1026.1to $120 $1,2421577305ft
feet 4.0-5.028.8 Cross Slope (PAR)SF7545.4to $120 $8,9641577315ft
feet31.3 Continuous Width SF432.3to $120 $5401671695ft
feet 5.0-6.049.6 Cross Slope (PAR)SF3056.3to $120 $3,6181577325ft
feet 5.0-6.058.6 Cross Slope (PAR)SF3165.4to $120 $3,6721577335ft
feet63.8 Continuous Width SF564.8to $120 $5401674455ft
feet 3.0-4.065.4 Cross Slope (PAR)SF3072.0to $120 $3,5641577345ft
feet 3.0-4.076.2 Cross Slope (PAR)SF3283.3to $120 $3,8341577355ft
feet 2.0-3.086.8 Cross Slope (PAR)SF1991.1to $120 $2,3221577365ft
feet 4.0-5.092.3 Cross Slope (PAR)SF102115.0to $120 $12,2581577375ft
feet 3.0-4.0117.3 Cross Slope (PAR)SF50128.3to $120 $5,9401577385ft
feet 3.0-4.0136.5 Cross Slope (PAR)SF31143.4to $120 $3,7261577395ft
feet 2.0-3.0150.8 Cross Slope (PAR)SF6152.1to $120 $7021577405ft
feet 4.0-5.0153.8 Cross Slope (PAR)SF61167.3to $120 $7,2901577415ft
feet 1.16154.5 Vertical Change REF5155.5to138079 5 ft
feet .36160.9 Vertical Change REF5161.9to138080 5 ft
feet 2.0-3.0168.3 Cross Slope (PAR)SF18172.4to $120 $2,2141577425ft
feet 4.0-5.0174.6 Cross Slope (PAR)SF36182.5to $120 $4,2661577435ft
feet 2.0-3.0183.0 Cross Slope (PAR)SF33190.3to $120 $3,9421577445ft
feet 3.0-4.0194.1 Cross Slope (PAR)SF31200.9to $120 $3,6721577455ft
feet -.3200.1 Vertical Change REF5201.1to138081 5 ft
feet 5.0-6.0202.6 Cross Slope (PAR)SF34210.1to $120 $4,0501577465ft
feet 3.0-4.0210.3 Cross Slope (PAR)SF8212.1to $120 $9721577475ft
feet 5.0-6.0214.0 Cross Slope (PAR)SF7215.5to $120 $8101577485ft
feet 6.0-7.0215.5 Cross Slope (PAR)SF14218.6to $120 $1,6741577495ft
feet 5.0-6.0218.8 Cross Slope (PAR)SF22223.7to $120 $2,6461577505ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
480
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE AYERS AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161006
Run ID
Ayers Ave
98.25
ID Sidewalk Width
Priority
feet 5.0-6.0227.9 Cross Slope (PAR)SF5229.0to $120 $5941577515ft
feet 6.0-7.0230.1 Cross Slope (PAR)SF5231.3to $120 $6481577525ft
feet 5.0-6.0231.3 Cross Slope (PAR)SF18235.2to $120 $2,1061577535ft
feet 4.0-5.0239.3 Cross Slope (PAR)SF92259.8to $120 $11,0701577545ft
feet 4.0-5.0263.3 Cross Slope (PAR)SF86282.5to $120 $10,3681577555ft
feet271.3 Continuous Width SF5272.3to $120 $5401671295ft
feet278.8 Continuous Width SF5279.8to $120 $5401674855ft
feet 8.0-9.0284.9 Cross Slope (PAR)SF13287.8to $120 $1,5661577565ft
feet 4.0-5.0288.7 Cross Slope (PAR)SF14291.8to $120 $1,6741577575ft
feet291.3 Continuous Width SF5292.3to $120 $5401674305ft
feet 2.0-3.0295.0 Cross Slope (PAR)SF17298.8to $120 $2,0521577585ft
feet 4.0-5.0298.9 Cross Slope (PAR)SF31305.7to $120 $3,6721577595ft
feet .51306.2 Vertical Change SF5307.2to $75 $3381380835ft
feet 5.0-6.0308.8 Cross Slope (PAR)SF73325.0to $120 $8,7481577605ft
feet 5.0-6.0327.6 Cross Slope (PAR)SF24332.9to $120 $2,8621577615ft
feet 5.0-6.0331.1 Running Slope REF5332.3to166610 5 ft
feet 3.0-4.0333.4 Cross Slope (PAR)SF43342.9to $120 $5,1301577625ft
feet333.4 Continuous Width SF5334.4to $120 $5401670955ft
feet337.7 Continuous Width SF5338.7to $120 $5401674865ft
feet .28341.4 Vertical Change REF5342.4to138084 5 ft
feet 2.0-3.0343.3 Cross Slope (PAR)SF11345.8to $120 $1,3501577635ft
feet 6.0-7.0347.3 Cross Slope (PAR)SF7348.8to $120 $8101577645ft
$149,593.50TOTAL COST FOR:AYERS AVENEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
481
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW AYERS AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 26TH ST
End Street Name
2001161020
Run ID
Ayers Ave
67.25
ID Sidewalk Width
Priority
feet 5.0-6.04.6 Running Slope SF85.7to $120 $9901666068ft
feet 3.0-4.013.3 Cross Slope (PAR)SF9225.5to $120 $10,9801576558ft
feet 2.0-3.026.0 Cross Slope (PAR)SF3330.4to $120 $3,9601576568ft
feet 4.0-5.030.8 Cross Slope (PAR)SF3235.0to $120 $3,7801576578ft
feet 3.0-4.037.1 Cross Slope (PAR)SF2039.8to $120 $2,4301576588ft
feet 2.0-3.039.8 Cross Slope (PAR)SF8150.6to $120 $9,7201576598ft
feet 4.0-5.052.1 Cross Slope (PAR)SF6160.2to $120 $7,2901576608ft
feet 3.0-4.063.1 Cross Slope (PAR)SF4368.8to $120 $5,1301576618ft
feet 2.0-3.070.3 Cross Slope (PAR)SF8281.2to $120 $9,8101576628ft
feet 2.0-3.086.1 Cross Slope (PAR)SF5393.2to $120 $6,3901576638ft
feet 2.0-3.097.0 Cross Slope (PAR)SF53104.0to $120 $6,3001576648ft
feet 2.0-3.0106.8 Cross Slope (PAR)SF10108.1to $120 $1,1701576658ft
feet 3.0-4.0110.8 Cross Slope (PAR)SF8111.9to $120 $9901576668ft
feet 2.0-3.0122.3 Cross Slope (PAR)SF74132.2to $120 $8,9101576678ft
feet139.6 Cold Patch 26143.1to140556 8 ft
feet145.3 Driveway191.6to165923
feet .32147.5 Vertical Change REF8148.5to138064 8 ft
feet 2.0-3.0197.0 Cross Slope (PAR)SF14198.8to $120 $1,6201576688ft
feet 3.23201.4 Vertical Change SF8202.4to $75 $5631380658ft
feet 2.0-3.0202.8 Cross Slope (PAR)SF11204.2to $120 $1,2601576698ft
feet 2.0-3.0208.3 Cross Slope (PAR)SF323251.3to $120 $38,7001576708ft
feet .37243.2 Vertical Change REF8244.2to138066 8 ft
feet .55250.6 Vertical Change REF8251.6to138067 8 ft
feet .98252.7 Vertical Change REF23255.8to138068 8 ft
feet 2.0-3.0253.5 Cross Slope (PAR)SF16255.6to $120 $1,8901576718ft
feet .58256.6 Vertical Change SF24259.8to $75 $1,8001380698ft
feet 2.0-3.0259.8 Cross Slope (PAR)SF52266.7to $120 $6,2101576728ft
feet .29263.3 Vertical Change REF8264.3to138070 8 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
482
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW AYERS AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 26TH ST
End Street Name
2001161020
Run ID
Ayers Ave
67.25
ID Sidewalk Width
Priority
feet 2.0-3.0271.6 Cross Slope (PAR)SF61279.8to $120 $7,3801576738ft
feet -.62274.5 Vertical Change REF8275.5to138071 8 ft
feet 2.0-3.0282.8 Cross Slope (PAR)SF18285.2to $120 $2,1601576748ft
feet 2.0-3.0288.3 Cross Slope (PAR)SF17290.6to $120 $2,0701576758ft
feet 2.0-3.0294.0 Cross Slope (PAR)SF44299.8to $120 $5,2201576768ft
feet 2.0-3.0308.3 Cross Slope (PAR)SF98321.4to $120 $11,7901576778ft
feet .31324.3 Vertical Change LF8325.3to $75 $5631380728ft
feet 3.0-4.0327.8 Cross Slope (PAR)SF32332.1to $120 $3,8701576788ft
feet 2.0-3.0332.5 Cross Slope (PAR)SF87344.1to $120 $10,4401576798ft
feet 3.0-4.0346.5 Cross Slope (PAR)SF36351.3to $120 $4,3201576808ft
feet 2.0-3.0352.6 Cross Slope (PAR)SF103366.3to $120 $12,3301576818ft
feet 4.0-5.0366.3 Cross Slope (PAR)SF33370.7to $120 $3,9601576828ft
feet 2.0-3.0371.5 Cross Slope (PAR)SF9372.7to $120 $1,0801576838ft
feet 2.0-3.0377.1 Cross Slope (PAR)SF24380.3to $120 $2,8801576848ft
feet 5.0-6.0379.9 Running Slope REF8381.0to166607 8 ft
feet 4.0-5.0380.3 Cross Slope (PAR)SF11381.8to $120 $1,3501576858ft
feet 6.0-7.0381.0 Running Slope REF11382.4to166608 8 ft
$199,305.00TOTAL COST FOR:AYERS AVESWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
483
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
2939 BANDINI BLVD
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151601
Run ID
Bandini Blvd
93.75
ID Sidewalk Width
Priority
feet 2.0-3.06.5 Cross Slope (PAR)SF118.0to $120 $1,2601540137ft
feet 2.0-3.018.2 Cross Slope (PAR)SF2221.4to $120 $2,6881540147ft
feet 2.0-3.023.7 Cross Slope (PAR)SF1025.1to $120 $1,1761540157ft
feet .3724.5 Vertical Change REF725.5to137429 7 ft
feet 2.0-3.038.0 Cross Slope (PAR)SF1139.5to $120 $1,2601540167ft
feet57.6 Driveway98.5to165715
feet 3.0-4.0100.8 Cross Slope (PAR)SF43107.0to $120 $5,2081540177ft
feet 4.0-5.0110.9 Cross Slope (PAR)SF60119.5to $120 $7,2241540187ft
feet 3.0-4.0121.8 Cross Slope (PAR)SF14123.8to $120 $1,6801540197ft
feet -.26126.8 Vertical Change REF7127.8to137430 7 ft
feet 5.0-6.0127.3 Cross Slope (PAR)SF7128.3to $120 $8401540207ft
feet 3.0-4.0129.8 Cross Slope (PAR)SF7130.8to $120 $8401540217ft
feet 3.0-4.0133.5 Cross Slope (PAR)SF36138.7to $120 $4,3681540227ft
feet 4.0-5.0142.6 Cross Slope (PAR)SF9143.9to $120 $1,0921540237ft
feet 2.0-3.0148.8 Cross Slope (PAR)SF8150.0to $120 $1,0081540247ft
feet 3.0-4.0152.7 Cross Slope (PAR)SF8153.9to $120 $1,0081540257ft
feet 3.0-4.0156.6 Cross Slope (PAR)SF19159.3to $120 $2,2681540267ft
feet 3.0-4.0174.0 Cross Slope (PAR)SF15176.1to $120 $1,7641540277ft
feet176.1 Driveway194.5to165716
feet195.4 Cold Patch 73205.8to140505 7 ft
feet 2.0-3.0216.2 Cross Slope (PAR)SF43222.3to $120 $5,1241540287ft
feet 2.0-3.0224.5 Cross Slope (PAR)SF36229.7to $120 $4,3681540297ft
feet 2.0-3.0232.6 Cross Slope (PAR)SF74243.2to $120 $8,9041540307ft
feet 3.0-4.0247.3 Cross Slope (PAR)SF53254.8to $120 $6,3001540317ft
feet 2.0-3.0254.8 Cross Slope (PAR)SF72265.1to $120 $8,6521540327ft
feet 2.0-3.0268.7 Cross Slope (PAR)SF137288.3to $120 $16,4641540337ft
feet 3.0-4.0291.0 Cross Slope (PAR)SF9292.3to $120 $1,0921540347ft
feet 2.0-3.0292.6 Cross Slope (PAR)SF50299.8to $120 $6,0481540357ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
484
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
2939 BANDINI BLVD
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151601
Run ID
Bandini Blvd
93.75
ID Sidewalk Width
Priority
feet 2.0-3.0306.7 Cross Slope (PAR)SF21309.7to $120 $2,5201540367ft
feet 2.0-3.0313.0 Cross Slope (PAR)SF46319.5to $120 $5,4601540377ft
feet 2.0-3.0321.8 Cross Slope (PAR)SF49328.8to $120 $5,8801540387ft
feet 2.0-3.0331.2 Cross Slope (PAR)SF53338.8to $120 $6,3841540397ft
feet 2.0-3.0342.0 Cross Slope (PAR)SF57350.1to $120 $6,8041540407ft
feet 2.0-3.0352.3 Cross Slope (PAR)SF91365.3to $120 $10,9201540417ft
feet 3.0-4.0367.7 Cross Slope (PAR)SF12369.4to $120 $1,4281540427ft
feet 3.0-4.0373.5 Cross Slope (PAR)SF20376.3to $120 $2,3521540437ft
feet 3.0-4.0378.8 Cross Slope (PAR)SF8380.0to $120 $1,0081540447ft
feet 2.0-3.0380.2 Cross Slope (PAR)SF81391.8to $120 $9,7441540457ft
feet 2.0-3.0396.1 Cross Slope (PAR)SF11397.7to $120 $1,3441540467ft
feet 2.0-3.0401.8 Cross Slope (PAR)SF15404.0to $120 $1,8481540477ft
feet 2.0-3.0408.5 Cross Slope (PAR)SF15410.7to $120 $1,8481540487ft
feet 2.0-3.0413.5 Cross Slope (PAR)SF275452.8to $120 $33,0121540497ft
feet 2.0-3.0455.8 Cross Slope (PAR)SF56463.8to $120 $6,7201540507ft
feet 2.0-3.0466.8 Cross Slope (PAR)SF26470.5to $120 $3,1081540517ft
feet 2.0-3.0476.8 Cross Slope (PAR)SF37482.1to $120 $4,4521540527ft
feet 2.0-3.0486.2 Cross Slope (PAR)SF9487.5to $120 $1,0921540537ft
feet -.32494.3 Vertical Change REF7495.3to137431 7 ft
feet 2.0-3.0495.2 Cross Slope (PAR)SF71505.3to $120 $8,4841540547ft
feet 2.0-3.0512.9 Cross Slope (PAR)SF36518.1to $120 $4,3681540557ft
feet 2.0-3.0521.9 Cross Slope (PAR)SF17524.3to $120 $2,0161540567ft
feet 3.0-4.0529.7 Cross Slope (PAR)SF42535.7to $120 $5,0401540577ft
feet 2.0-3.0535.7 Cross Slope (PAR)SF50542.8to $120 $5,9641540587ft
feet 4.0-5.0546.1 Cross Slope (PAR)SF15548.3to $120 $1,8481540597ft
feet 2.0-3.0551.3 Cross Slope (PAR)SF26555.0to $120 $3,1081540607ft
feet 2.0-3.0558.9 Cross Slope (PAR)SF45565.3to $120 $5,3761540617ft
feet 4.0-5.0565.3 Cross Slope (PAR)SF19568.0to $120 $2,2681540627ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
485
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
2939 BANDINI BLVD
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151601
Run ID
Bandini Blvd
93.75
ID Sidewalk Width
Priority
feet 2.0-3.0568.9 Cross Slope (PAR)SF38574.3to $120 $4,5361540637ft
feet 4.0-5.0574.3 Cross Slope (PAR)SF41580.2to $120 $4,9561540647ft
feet 2.0-3.0580.2 Cross Slope (PAR)SF10581.6to $120 $1,1761540657ft
feet 2.0-3.0586.9 Cross Slope (PAR)SF55594.7to $120 $6,5521540667ft
feet 2.0-3.0598.5 Cross Slope (PAR)SF99612.6to $120 $11,8441540677ft
feet 2.0-3.0617.6 Cross Slope (PAR)SF24621.0to $120 $2,8561540687ft
feet 2.0-3.0625.0 Cross Slope (PAR)SF53632.5to $120 $6,3001540697ft
feet 6.0-7.0626.3 Running Slope REF8627.4to166508 7 ft
feet 2.0-3.0635.8 Cross Slope (PAR)SF42641.8to $120 $5,0401540707ft
feet 4.0-5.0644.0 Cross Slope (PAR)SF26647.7to $120 $3,1081540717ft
feet 2.0-3.0661.5 Cross Slope (PAR)SF49668.5to $120 $5,8801540727ft
feet 2.0-3.0674.3 Cross Slope (PAR)SF17676.7to $120 $2,0161540737ft
feet 2.0-3.0680.1 Cross Slope (PAR)SF12681.8to $120 $1,4281540747ft
feet 3.0-4.0693.1 Cross Slope (PAR)SF11694.6to $120 $1,2601540757ft
feet 2.0-3.0695.5 Cross Slope (PAR)SF9696.8to $120 $1,0921540767ft
feet 2.0-3.0701.7 Cross Slope (PAR)SF25705.3to $120 $3,0241540777ft
feet 2.0-3.0708.0 Cross Slope (PAR)SF16710.3to $120 $1,9321540787ft
feet 3.0-4.0713.5 Cross Slope (PAR)SF26717.2to $120 $3,1081540797ft
feet 2.0-3.0717.2 Cross Slope (PAR)SF8718.4to $120 $1,0081540807ft
feet 2.0-3.0727.7 Cross Slope (PAR)SF74738.2to $120 $8,8201540817ft
feet 2.0-3.0746.6 Cross Slope (PAR)SF25750.2to $120 $3,0241540827ft
feet 2.0-3.0752.3 Cross Slope (PAR)SF98766.3to $120 $11,7601540837ft
feet 3.0-4.0769.2 Cross Slope (PAR)SF7770.2to $120 $8401540847ft
feet 3.0-4.0775.3 Cross Slope (PAR)SF15777.4to $120 $1,7641540857ft
feet 2.0-3.0778.3 Cross Slope (PAR)SF7779.3to $120 $8401540867ft
feet 2.0-3.0786.3 Cross Slope (PAR)SF21789.3to $120 $2,5201540877ft
feet 2.0-3.0792.6 Cross Slope (PAR)SF11794.2to $120 $1,3441540887ft
feet 2.0-3.0798.2 Cross Slope (PAR)SF39803.8to $120 $4,7041540897ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
486
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
2939 BANDINI BLVD
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151601
Run ID
Bandini Blvd
93.75
ID Sidewalk Width
Priority
feet 2.0-3.0814.4 Cross Slope (PAR)SF7815.4to $120 $8401540907ft
feet -.42823.3 Vertical Change LF7824.3to $75 $5251374327ft
feet823.9 Cold Patch 12825.6to140506 7 ft
feet 3.0-4.0825.6 Cross Slope (PAR)SF10827.0to $120 $1,1761540917ft
feet 3.0-4.0844.1 Cross Slope (PAR)SF99858.3to $120 $11,9281540927ft
feet .32858.2 Vertical Change REF7859.2to137433 7 ft
feet .29861.3 Vertical Change REF7862.3to137434 7 ft
feet 2.0-3.0862.1 Cross Slope (PAR)SF106877.3to $120 $12,7681540937ft
feet -.3880.9 Vertical Change REF7881.9to137435 7 ft
feet 2.0-3.0881.3 Cross Slope (PAR)SF22884.5to $120 $2,6881540947ft
feet884.8 Driveway920.7to165717
feet 3.0-4.0926.7 Cross Slope (PAR)SF15928.8to $120 $1,7641540957ft
feet 2.0-3.0932.7 Cross Slope (PAR)SF50939.8to $120 $5,9641540967ft
feet 3.0-4.0944.3 Cross Slope (PAR)SF14946.3to $120 $1,6801540977ft
feet 2.0-3.0951.8 Cross Slope (PAR)SF57959.9to $120 $6,8041540987ft
feet 2.0-3.0969.3 Cross Slope (PAR)SF29973.4to $120 $3,4441540997ft
feet 4.0-5.0977.3 Cross Slope (PAR)SF144997.8to $120 $17,2201541007ft
feet 3.0-4.01000.1 Cross Slope (PAR)SF81001.3to $120 $1,0081541017ft
feet 2.0-3.01002.3 Cross Slope (PAR)SF621011.2to $120 $7,4761541027ft
feet 3.0-4.01018.9 Cross Slope (PAR)SF81020.1to $120 $1,0081541037ft
feet 3.0-4.01023.2 Cross Slope (PAR)SF121024.9to $120 $1,4281541047ft
feet 2.0-3.01024.9 Cross Slope (PAR)SF301029.2to $120 $3,6121541057ft
feet 2.0-3.01033.0 Cross Slope (PAR)SF361038.2to $120 $4,3681541067ft
feet 2.0-3.01044.3 Cross Slope (PAR)SF381049.7to $120 $4,5361541077ft
feet 2.0-3.01053.3 Cross Slope (PAR)SF111054.8to $120 $1,2601541087ft
feet 3.0-4.01059.3 Cross Slope (PAR)SF91060.6to $120 $1,0921541097ft
feet 2.0-3.01060.9 Cross Slope (PAR)SF1481082.1to $120 $17,8081541107ft
feet 3.0-4.01084.3 Cross Slope (PAR)SF391089.9to $120 $4,7041541117ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
487
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
2939 BANDINI BLVD
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151601
Run ID
Bandini Blvd
93.75
ID Sidewalk Width
Priority
feet .31095.6 Vertical Change LF71096.6to $75 $5251374377ft
$453,390.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:2939 BANDINI BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
488
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
3308 BANDINI BLVD
Survey Street Name Starting Street Name
CITY BOUNDARY
End Street Name
2001151251
Run ID
Bandini Blvd
92
ID Sidewalk Width
Priority
feet 3.0-4.00.8 Cross Slope (PAR)SF14319.9to $120 $17,1901550628ft
feet 3.418.6 Vertical Change REF89.6to137599 8 ft
feet 2.0-3.019.9 Cross Slope (PAR)SF3724.8to $120 $4,4101550638ft
feet 4.0-5.024.8 Cross Slope (PAR)SF4831.2to $120 $5,7601550648ft
feet 2.0-3.031.2 Cross Slope (PAR)SF19256.8to $120 $23,0401550658ft
feet 4.0-5.058.2 Cross Slope (PAR)SF6566.9to $120 $7,8301550668ft
feet 2.0-3.072.3 Cross Slope (PAR)SF873.3to $120 $9001550678ft
feet 2.0-3.077.1 Cross Slope (PAR)SF878.2to $120 $9901550688ft
feet78.2 Driveway120.8to165788
feet 3.53112.0 Vertical Change REF8113.0to137600 8 ft
feet 3.35116.5 Vertical Change REF25119.8to137601 8 ft
feet 2.0-3.0121.8 Cross Slope (PAR)SF116137.3to $120 $13,9501550698ft
feet 3.41125.6 Vertical Change REF41131.1to137602 8 ft
feet .31138.2 Vertical Change LF8139.2to $75 $5631376038ft
feet138.4 Driveway191.7to165789
feet 3.59157.3 Vertical Change REF8158.3to137604 8 ft
feet .28159.8 Vertical Change REF8160.8to137605 8 ft
feet .26201.9 Vertical Change LF8202.9to $75 $5631376068ft
feet208.6 Driveway226.5to165790
feet -.28216.0 Vertical Change REF8217.0to137607 8 ft
feet 2.0-3.0228.9 Cross Slope (PAR)SF32233.2to $120 $3,8701550708ft
feet 4.0-5.0235.7 Cross Slope (PAR)SF68244.7to $120 $8,1001550718ft
feet 2.0-3.0244.9 Cross Slope (PAR)SF110259.6to $120 $13,2301550728ft
feet 3.0-4.0263.0 Cross Slope (PAR)SF24266.2to $120 $2,8801550738ft
feet 2.0-3.0266.2 Cross Slope (PAR)SF8267.3to $120 $9901550748ft
feet 2.0-3.0270.5 Cross Slope (PAR)SF71280.0to $120 $8,5501550758ft
feet .6277.9 Vertical Change REF8278.9to137608 8 ft
feet 2.0-3.0282.3 Cross Slope (PAR)SF37287.2to $120 $4,4101550768ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
489
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
3308 BANDINI BLVD
Survey Street Name Starting Street Name
CITY BOUNDARY
End Street Name
2001151251
Run ID
Bandini Blvd
92
ID Sidewalk Width
Priority
feet 4.0-5.0288.3 Cross Slope (PAR)SF49294.8to $120 $5,8501550778ft
feet .58293.7 Vertical Change REF8294.7to137609 8 ft
feet 2.0-3.0296.2 Cross Slope (PAR)SF18298.6to $120 $2,1601550788ft
feet 2.0-3.0302.2 Cross Slope (PAR)SF8303.3to $120 $9901550798ft
feet 3.0-4.0306.1 Cross Slope (PAR)SF38311.1to $120 $4,5001550808ft
feet 9.0-10.0319.7 Cross Slope (PAR)SF105333.7to $120 $12,6001550818ft
feet333.9 Driveway343.8to165791
feet 3.0-4.0345.9 Cross Slope (PAR)SF19348.4to $120 $2,2501550828ft
feet 2.0-3.0348.8 Cross Slope (PAR)SF15350.8to $120 $1,8001550838ft
feet 1.37356.8 Vertical Change SF8357.8to $75 $5631376108ft
feet 2.0-3.0372.5 Cross Slope (PAR)SF16374.6to $120 $1,8901550848ft
feet .27372.6 Vertical Change REF8373.6to137611 8 ft
feet -.28386.4 Vertical Change REF8387.4to137612 8 ft
feet 2.0-3.0387.4 Cross Slope (PAR)SF71396.9to $120 $8,5501550858ft
feet .44398.5 Vertical Change LF28402.2to $75 $2,0811376138ft
$160,458.75TOTAL COST FOR:BANDINI BLVDSside of Starting at:3308 BANDINI BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
490
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161608
Run ID
Bandini Blvd
94
ID Sidewalk Width
Priority
feet .451.6 Vertical Change LF102.6to $75 $71313779110ft
feet 2.0-3.05.3 Cross Slope (PAR)SF177.1to $120 $2,05215607110ft
feet 2.0-3.015.1 Cross Slope (PAR)SF5821.2to $120 $6,95415607210ft
feet 2.0-3.024.6 Cross Slope (PAR)SF8033.0to $120 $9,57615607310ft
feet 2.0-3.047.3 Cross Slope (PAR)SF2449.8to $120 $2,85015607410ft
feet 3.0-4.052.0 Cross Slope (PAR)SF1653.7to $120 $1,93815607510ft
feet 3.0-4.059.3 Cross Slope (PAR)SF2061.4to $120 $2,39415607610ft
feet 2.0-3.061.4 Cross Slope (PAR)SF9971.8to $120 $11,85615607710ft
feet .2769.2 Vertical Change REF1070.2to137792 10 ft
feet 2.0-3.084.3 Cross Slope (PAR)SF1285.6to $120 $1,48215607810ft
feet .2793.5 Vertical Change LF1094.5to $75 $71313779310ft
feet 2.0-3.097.0 Cross Slope (PAR)SF2199.2to $120 $2,50815607910ft
feet 2.0-3.0106.0 Cross Slope (PAR)SF19108.0to $120 $2,28015608010ft
feet -.28107.4 Vertical Change REF10108.4to137794 10 ft
feet 2.0-3.0110.7 Cross Slope (PAR)SF130124.4to $120 $15,61815608110ft
feet 2.0-3.0131.8 Cross Slope (PAR)SF48136.8to $120 $5,70015608210ft
feet 2.0-3.0139.0 Cross Slope (PAR)SF31142.3to $120 $3,76215608310ft
feet 2.0-3.0170.8 Cross Slope (PAR)SF21173.0to $120 $2,50815608410ft
feet .86187.0 Vertical Change SF10188.0to $75 $71313779510ft
feet 4.0-5.0199.8 Cross Slope (PAR)SF133213.8to $120 $15,96015608510ft
feet 2.0-3.0213.9 Cross Slope (PAR)SF86222.9to $120 $10,26015608610ft
feet 4.0-5.0223.8 Cross Slope (PAR)SF223247.3to $120 $26,79015608710ft
feet -.26231.7 Vertical Change REF10232.7to137796 10 ft
feet 4.0-5.0252.4 Cross Slope (PAR)SF82261.0to $120 $9,80415608810ft
feet 3.0-4.0263.1 Cross Slope (PAR)SF44267.7to $120 $5,24415608910ft
feet 2.0-3.0267.7 Cross Slope (PAR)SF22270.0to $120 $2,62215609010ft
feet 2.0-3.0274.0 Cross Slope (PAR)SF31277.3to $120 $3,76215609110ft
feet 2.0-3.0279.8 Cross Slope (PAR)SF14281.3to $120 $1,71015609210ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
491
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161608
Run ID
Bandini Blvd
94
ID Sidewalk Width
Priority
feet .29284.3 Vertical Change REF10285.3to137797 10 ft
feet 2.0-3.0284.8 Cross Slope (PAR)SF14286.3to $120 $1,71015609310ft
feet 3.0-4.0299.0 Cross Slope (PAR)SF130312.7to $120 $15,61815609410ft
feet 2.0-3.0312.7 Cross Slope (PAR)SF10313.7to $120 $1,14015609510ft
feet 2.0-3.0317.9 Cross Slope (PAR)SF21320.1to $120 $2,50815609610ft
feet 1.74325.1 Vertical Change SF10326.1to $75 $71313779810ft
feet 2.0-3.0374.4 Cross Slope (PAR)SF23376.8to $120 $2,73615609710ft
feet 2.0-3.0384.5 Cross Slope (PAR)SF73392.2to $120 $8,77815609810ft
feet .5394.8 Vertical Change SF10395.8to $75 $71313779910ft
feet 2.0-3.0406.0 Cross Slope (PAR)SF29409.0to $120 $3,42015609910ft
feet .28411.8 Vertical Change REF10412.8to137800 10 ft
feet 2.0-3.0411.9 Cross Slope (PAR)SF19413.9to $120 $2,28015610010ft
feet 2.0-3.0416.2 Cross Slope (PAR)SF143431.3to $120 $17,21415610110ft
feet 2.0-3.0439.7 Cross Slope (PAR)SF108451.1to $120 $12,99615610210ft
feet 2.0-3.0473.6 Cross Slope (PAR)SF15475.2to $120 $1,82415610310ft
feet .49480.5 Vertical Change LF10481.5to $75 $71313780110ft
feet 3.0-4.0483.4 Cross Slope (PAR)SF12484.7to $120 $1,48215610410ft
feet -.29485.9 Vertical Change REF10486.9to137802 10 ft
feet 2.0-3.0486.0 Cross Slope (PAR)SF11487.2to $120 $1,36815610510ft
feet 2.0-3.0497.5 Cross Slope (PAR)SF61503.9to $120 $7,29615610610ft
feet .3506.4 Vertical Change LF10507.4to $75 $71313780310ft
feet 2.0-3.0513.3 Cross Slope (PAR)SF157529.8to $120 $18,81015610710ft
feet 2.0-3.0548.7 Cross Slope (PAR)SF10549.8to $120 $1,25415610810ft
feet553.7 Driveway603.1to165856
feet 3.0-4.0603.1 Cross Slope (Driveway)SF34606.7to $40 $1,36815610910ft
feet 2.0-3.0607.3 Cross Slope (PAR)SF35611.0to $120 $4,21815611010ft
feet .49621.4 Vertical Change REF10622.4to137804 10 ft
feet 5.0-6.0621.5 Cross Slope (PAR)SF27624.3to $120 $3,19215611110ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
492
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161608
Run ID
Bandini Blvd
94
ID Sidewalk Width
Priority
feet 3.0-4.0626.7 Cross Slope (PAR)SF15628.3to $120 $1,82415611210ft
feet 3.0-4.0630.8 Cross Slope (PAR)SF58636.9to $120 $6,95415611310ft
feet 3.0-4.0639.3 Cross Slope (PAR)SF105650.4to $120 $12,65415611410ft
feet 3.0-4.0652.9 Cross Slope (PAR)SF105664.0to $120 $12,65415611510ft
feet .36665.0 Vertical Change LF10666.0to $75 $71313780510ft
feet 3.0-4.0666.3 Cross Slope (PAR)SF15667.9to $120 $1,82415611610ft
feet 2.0-3.0670.5 Cross Slope (PAR)SF112682.3to $120 $13,45215611710ft
feet 3.0-4.0686.6 Cross Slope (PAR)SF15688.2to $120 $1,82415611810ft
feet 2.0-3.0691.3 Cross Slope (PAR)SF10692.3to $120 $1,14015611910ft
feet703.3 Cold Patch 28706.2to140535 10 ft
feet -.48707.1 Vertical Change LF10708.1to $75 $71313780610ft
feet 6.0-7.0711.5 Cross Slope (PAR)SF11712.7to $120 $1,36815612010ft
feet 5.0-6.0712.7 Cross Slope (PAR)SF20714.8to $120 $2,39415612110ft
feet 7.0-8.0722.4 Cross Slope (PAR)SF29725.5to $120 $3,53415612210ft
feet 5.0-6.0727.1 Cross Slope (PAR)SF11728.3to $120 $1,36815612310ft
feet728.5 Cold Patch 58734.6to140536 10 ft
feet 4.0-5.0734.8 Cross Slope (PAR)SF112746.6to $120 $13,45215612410ft
feet 3.0-4.0749.4 Cross Slope (PAR)SF26752.1to $120 $3,07815612510ft
feet 2.0-3.0752.6 Cross Slope (PAR)SF16754.3to $120 $1,93815612610ft
feet 2.0-3.0758.2 Cross Slope (PAR)SF11759.4to $120 $1,36815612710ft
feet 4.0-5.0760.3 Cross Slope (PAR)SF156776.7to $120 $18,69615612810ft
feet 2.0-3.0776.8 Cross Slope (PAR)SF11778.0to $120 $1,36815612910ft
feet 2.0-3.0783.8 Cross Slope (PAR)SF137798.2to $120 $16,41615613010ft
feet 3.0-4.0800.4 Cross Slope (PAR)SF95810.4to $120 $11,40015613110ft
feet 2.0-3.0810.9 Cross Slope (PAR)SF32814.3to $120 $3,87615613210ft
feet 3.17812.8 Vertical Change REF10813.8to137808 10 ft
feet 4.0-5.0814.8 Cross Slope (PAR)SF128828.3to $120 $15,39015613310ft
feet 2.0-3.0828.3 Cross Slope (PAR)SF58834.4to $120 $6,95415613410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
493
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161608
Run ID
Bandini Blvd
94
ID Sidewalk Width
Priority
feet 3.0-4.0839.3 Cross Slope (PAR)SF56845.2to $120 $6,72615613510ft
feet 3.0-4.0850.3 Cross Slope (PAR)SF14851.8to $120 $1,71015613610ft
feet 3.0-4.0857.8 Cross Slope (PAR)SF48862.9to $120 $5,81415613710ft
feet 2.0-3.0862.9 Cross Slope (PAR)SF11864.1to $120 $1,36815613810ft
feet864.8 Cold Patch 40869.0to140537 10 ft
feet -.31866.1 Vertical Change LF10867.1to $75 $71313780910ft
feet 5.0-6.0872.1 Cross Slope (PAR)SF21874.3to $120 $2,50815613910ft
feet .3875.2 Vertical Change LF10876.2to $75 $71313781010ft
feet 5.0-6.0877.2 Cross Slope (PAR)SF10878.2to $120 $1,14015614010ft
feet 4.0-5.0880.7 Cross Slope (PAR)SF105891.8to $120 $12,65415614110ft
feet 2.0-3.0892.0 Cross Slope (PAR)SF27894.8to $120 $3,19215614210ft
feet902.2 Driveway944.1to165857
feet 4.0-5.0944.1 Cross Slope (Driveway)SF46948.9to $40 $1,82415614310ft
feet 2.0-3.0950.9 Cross Slope (PAR)SF13952.3to $120 $1,59615614410ft
feet 2.0-3.0968.3 Cross Slope (PAR)SF13969.7to $120 $1,59615614510ft
feet 2.0-3.0973.5 Cross Slope (PAR)SF12974.8to $120 $1,48215614610ft
feet .3985.4 Vertical Change REF10986.4to137811 10 ft
feet 2.0-3.0985.4 Cross Slope (PAR)SF26988.1to $120 $3,07815614710ft
feet 2.0-3.0991.8 Cross Slope (PAR)SF10992.8to $120 $1,14015614810ft
feet 2.0-3.0995.8 Cross Slope (PAR)SF10996.8to $120 $1,14015614910ft
feet1000.7 Driveway1019.7to165858
feet .341018.7 Vertical Change REF101019.7to137812 10 ft
feet 3.0-4.01020.2 Cross Slope (Driveway)SF141021.7to $40 $57015615010ft
feet 2.0-3.01021.7 Cross Slope (PAR)SF1861041.3to $120 $22,34415615110ft
feet .271033.0 Vertical Change REF101034.0to137813 10 ft
feet 2.0-3.01043.7 Cross Slope (PAR)SF1351057.9to $120 $16,18815615210ft
feet 2.0-3.01060.8 Cross Slope (PAR)SF591067.0to $120 $7,06815615310ft
feet .841065.7 Vertical Change REF101066.7to137814 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
494
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161608
Run ID
Bandini Blvd
94
ID Sidewalk Width
Priority
feet -.431073.2 Vertical Change REF101074.2to137815 10 ft
feet 2.0-3.01073.5 Cross Slope (PAR)SF101074.5to $120 $1,14015615410ft
feet 3.0-4.01089.7 Cross Slope (PAR)SF321093.1to $120 $3,87615615510ft
feet 2.0-3.01093.3 Cross Slope (PAR)SF151094.9to $120 $1,82415615610ft
feet1093.3 Continuous Width REF101094.3to167808 10 ft
feet 4.0-5.01095.7 Cross Slope (PAR)SF341099.3to $120 $4,10415615710ft
feet 2.0-3.01101.6 Cross Slope (PAR)SF101102.7to $120 $1,25415615810ft
feet 2.0-3.01104.9 Cross Slope (PAR)SF141106.4to $120 $1,71015615910ft
feet 4.0-5.01107.1 Cross Slope (PAR)SF461111.9to $120 $5,47215616010ft
feet 2.0-3.01122.7 Cross Slope (PAR)SF841131.5to $120 $10,03215616110ft
feet 4.0-5.01132.3 Cross Slope (PAR)SF871141.5to $120 $10,48815616210ft
feet 2.0-3.01142.3 Cross Slope (PAR)SF2471168.3to $120 $29,64015616310ft
feet .411147.1 Vertical Change REF101148.1to137816 10 ft
feet 4.0-5.01170.4 Cross Slope (PAR)SF1801189.3to $120 $21,54615616410ft
feet 2.0-3.01190.0 Cross Slope (PAR)SF541195.7to $120 $6,49815616510ft
feet1195.7 Cold Patch 391199.8to140538 10 ft
feet 3.0-4.01202.8 Cross Slope (PAR)SF571208.8to $120 $6,84015616610ft
feet1209.1 Cold Patch 391213.2to140539 10 ft
feet1209.1 Cold Patch 4771259.3to140540 10 ft
feet .551210.9 Vertical Change SF101211.9to $75 $71313781710ft
feet .31213.2 Vertical Change LF101214.2to $75 $71313781810ft
feet1213.7 Continuous Width SF101214.7to $120 $1,14016760010ft
feet 5.0-6.01219.3 Cross Slope (PAR)SF421223.7to $120 $5,01615616710ft
feet 3.0-4.01223.7 Cross Slope (PAR)SF111224.9to $120 $1,36815616810ft
feet 2.0-3.01225.5 Cross Slope (PAR)SF791233.8to $120 $9,46215616910ft
feet 2.0-3.01241.3 Cross Slope (PAR)SF121242.6to $120 $1,48215617010ft
feet .511246.1 Vertical Change SF101247.1to $75 $71313781910ft
feet 2.0-3.01253.9 Cross Slope (PAR)SF231256.3to $120 $2,73615617110ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
495
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
BANDINI BLVD
End Street Name
2001161608
Run ID
Bandini Blvd
94
ID Sidewalk Width
Priority
$640,509.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:3768 BANDINI BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
496
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161652
Run ID
Bandini Blvd
73
ID Sidewalk Width
Priority
feet 6.0-7.01.4 Cross Slope (PAR)SF132.8to $120 $1,59615582510ft
feet 5.0-6.04.1 Cross Slope (PAR)SF105.2to $120 $1,25415582610ft
feet 6.0-7.08.4 Cross Slope (PAR)SF1510.0to $120 $1,82415582710ft
feet 5.0-6.010.3 Cross Slope (PAR)SF1712.1to $120 $2,05215582810ft
feet 4.0-5.014.8 Cross Slope (PAR)SF1216.1to $120 $1,48215582910ft
feet 6.0-7.019.5 Cross Slope (PAR)SF4524.2to $120 $5,35815583010ft
feet .9221.3 Vertical Change REF1022.3to137747 10 ft
feet 4.0-5.026.2 Cross Slope (PAR)SF7033.6to $120 $8,43615583110ft
feet 4.0-5.039.4 Cross Slope (PAR)SF12652.7to $120 $15,16215583210ft
feet 2.0-3.053.8 Cross Slope (PAR)SF8763.0to $120 $10,48815583310ft
feet 2.0-3.066.2 Cross Slope (PAR)SF3870.2to $120 $4,56015583410ft
feet70.2 Driveway90.7to165845
feet 4.0-5.093.9 Cross Slope (PAR)SF195114.4to $120 $23,37015583510ft
feet 4.0-5.0117.3 Cross Slope (PAR)SF97127.5to $120 $11,62815583610ft
feet 3.0-4.0130.2 Cross Slope (PAR)SF28133.1to $120 $3,30615583710ft
feet 2.0-3.0133.1 Cross Slope (PAR)SF10134.2to $120 $1,25415583810ft
feet 3.0-4.0141.7 Cross Slope (PAR)SF54147.4to $120 $6,49815583910ft
feet 2.0-3.0156.9 Cross Slope (PAR)SF22159.2to $120 $2,62215584010ft
feet 3.0-4.0166.7 Cross Slope (PAR)SF15168.3to $120 $1,82415584110ft
feet 2.0-3.0169.0 Cross Slope (PAR)SF126182.3to $120 $15,16215584210ft
feet 4.0-5.0182.8 Cross Slope (PAR)SF86191.8to $120 $10,26015584310ft
feet .8191.4 Vertical Change REF10192.4to137748 10 ft
feet 2.0-3.0192.2 Cross Slope (PAR)SF39196.3to $120 $4,67415584410ft
feet 4.0-5.0197.5 Cross Slope (PAR)SF183216.8to $120 $22,00215584510ft
feet 2.76199.7 Vertical Change REF10200.7to137749 10 ft
feet 2.41203.5 Vertical Change REF10204.5to137750 10 ft
feet 2.07207.7 Vertical Change REF10208.7to137751 10 ft
feet 3.0-4.0219.2 Cross Slope (PAR)SF49224.4to $120 $5,92815584610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
497
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161652
Run ID
Bandini Blvd
73
ID Sidewalk Width
Priority
feet 2.0-3.0224.4 Cross Slope (PAR)SF56230.3to $120 $6,72615584710ft
feet .32228.1 Vertical Change REF10229.1to137752 10 ft
feet 3.0-4.0236.3 Cross Slope (PAR)SF106247.5to $120 $12,76815584810ft
feet 3.2237.6 Vertical Change REF10238.6to137753 10 ft
feet 2.0-3.0253.4 Cross Slope (PAR)SF138267.9to $120 $16,53015584910ft
feet 3.68256.1 Vertical Change REF10257.1to137754 10 ft
feet -.3272.8 Vertical Change REF10273.8to137755 10 ft
feet 2.0-3.0273.7 Cross Slope (PAR)SF11274.9to $120 $1,36815585010ft
feet .26280.1 Vertical Change LF10281.1to $75 $71313775610ft
feet 3.0-4.0282.8 Cross Slope (PAR)SF10283.9to $120 $1,25415585110ft
feet 2.0-3.0286.5 Cross Slope (PAR)SF174304.8to $120 $20,86215585210ft
feet 2.0-3.0314.2 Cross Slope (PAR)SF29317.3to $120 $3,53415585310ft
feet .32316.8 Vertical Change REF10317.8to137757 10 ft
feet -.26321.5 Vertical Change LF10322.5to $75 $71313775810ft
feet 3.0-4.0325.0 Cross Slope (PAR)SF14326.5to $120 $1,71015585410ft
feet 2.0-3.0327.4 Cross Slope (PAR)SF17329.2to $120 $2,05215585510ft
feet 2.0-3.0339.3 Cross Slope (PAR)SF97349.5to $120 $11,62815585610ft
feet 4.0-5.0352.5 Cross Slope (PAR)SF12353.8to $120 $1,48215585710ft
feet 2.0-3.0354.3 Cross Slope (PAR)SF15355.9to $120 $1,82415585810ft
feet 2.0-3.0362.3 Cross Slope (PAR)SF136376.6to $120 $16,30215585910ft
feet 2.0-3.0379.8 Cross Slope (PAR)SF10380.8to $120 $1,14015586010ft
feet 2.0-3.0386.3 Cross Slope (PAR)SF26389.0to $120 $3,07815586110ft
feet .51388.8 Vertical Change REF10389.8to137759 10 ft
feet 2.0-3.0391.5 Cross Slope (PAR)SF19393.5to $120 $2,28015586210ft
feet 3.0-4.0402.1 Cross Slope (PAR)SF114414.1to $120 $13,68015586310ft
feet415.3 Driveway436.0to165846
feet .54424.0 Vertical Change REF10425.0to137760 10 ft
feet 3.0-4.0436.0 Cross Slope (Driveway)SF21438.2to $40 $83615586410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
498
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161652
Run ID
Bandini Blvd
73
ID Sidewalk Width
Priority
feet 2.0-3.0438.3 Cross Slope (PAR)SF108449.7to $120 $12,99615586510ft
feet 2.0-3.0452.6 Cross Slope (PAR)SF41456.9to $120 $4,90215586610ft
feet 2.0-3.0467.8 Cross Slope (PAR)SF93477.6to $120 $11,17215586710ft
feet 3.0-4.0479.9 Cross Slope (PAR)SF39484.0to $120 $4,67415586810ft
feet 2.0-3.0484.3 Cross Slope (PAR)SF252510.8to $120 $30,21015586910ft
feet 2.0-3.0517.1 Cross Slope (PAR)SF58523.2to $120 $6,95415587010ft
feet 2.0-3.0528.6 Cross Slope (PAR)SF38532.6to $120 $4,56015587110ft
feet 4.0-5.0542.6 Cross Slope (PAR)SF67549.6to $120 $7,98015587210ft
feet 4.0-5.0552.8 Cross Slope (PAR)SF66559.7to $120 $7,86615587310ft
feet 2.0-3.0561.3 Cross Slope (PAR)SF49566.5to $120 $5,92815587410ft
feet 4.0-5.0566.8 Cross Slope (PAR)SF49572.0to $120 $5,92815587510ft
feet 3.0-4.0575.3 Cross Slope (PAR)SF67582.4to $120 $8,09415587610ft
feet 5.0-6.0583.8 Cross Slope (PAR)SF14585.3to $120 $1,71015587710ft
feet .72585.8 Vertical Change REF10586.8to137761 10 ft
feet 3.0-4.0586.8 Cross Slope (PAR)SF31590.1to $120 $3,76215587810ft
feet 4.0-5.0592.9 Cross Slope (PAR)SF134607.0to $120 $16,07415587910ft
feet 6.0-7.0607.8 Cross Slope (PAR)SF12609.1to $120 $1,48215588010ft
feet 5.0-6.0609.6 Cross Slope (PAR)SF65616.4to $120 $7,75215588110ft
feet 3.0-4.0619.4 Cross Slope (PAR)SF10620.4to $120 $1,14015588210ft
feet 2.0-3.0620.4 Cross Slope (PAR)SF23622.8to $120 $2,73615588310ft
feet 3.0-4.0630.0 Cross Slope (PAR)SF35633.7to $120 $4,21815588410ft
feet 2.0-3.0634.0 Cross Slope (PAR)SF12635.3to $120 $1,48215588510ft
feet .41635.9 Vertical Change LF10636.9to $75 $71313776210ft
feet 2.0-3.0650.8 Cross Slope (PAR)SF88660.1to $120 $10,60215588610ft
feet 2.0-3.0665.4 Cross Slope (PAR)SF33668.9to $120 $3,99015588710ft
feet 2.0-3.0672.0 Cross Slope (PAR)SF62678.5to $120 $7,41015588810ft
feet 2.0-3.0693.3 Cross Slope (PAR)SF62699.8to $120 $7,41015588910ft
feet 2.0-3.0707.4 Cross Slope (PAR)SF11708.6to $120 $1,36815589010ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
499
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
3768 BANDINI BLVD
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161652
Run ID
Bandini Blvd
73
ID Sidewalk Width
Priority
feet 2.0-3.0711.5 Cross Slope (PAR)SF54717.2to $120 $6,49815589110ft
feet 2.0-3.0736.5 Cross Slope (PAR)SF79744.8to $120 $9,46215589210ft
feet 2.0-3.0752.9 Cross Slope (PAR)SF31756.2to $120 $3,76215589310ft
feet 4.0-5.0756.2 Cross Slope (PAR)SF11757.4to $120 $1,36815589410ft
feet 2.0-3.0759.3 Cross Slope (PAR)SF10760.4to $120 $1,25415589510ft
feet 2.0-3.0772.8 Cross Slope (PAR)SF23775.2to $120 $2,73615589610ft
feet 2.0-3.0784.2 Cross Slope (PAR)SF36788.0to $120 $4,33215589710ft
feet 2.0-3.0790.1 Cross Slope (PAR)SF20792.2to $120 $2,39415589810ft
feet 3.0-4.0801.4 Cross Slope (PAR)SF10802.5to $120 $1,25415589910ft
feet 2.0-3.0803.1 Cross Slope (PAR)SF11804.3to $120 $1,36815590010ft
feet 2.0-3.0812.9 Cross Slope (PAR)SF16814.6to $120 $1,93815590110ft
feet 2.0-3.0818.4 Cross Slope (PAR)SF124831.4to $120 $14,82015590210ft
feet 2.0-3.0833.8 Cross Slope (PAR)SF11835.0to $120 $1,36815590310ft
feet 2.0-3.0838.4 Cross Slope (PAR)SF42842.8to $120 $5,01615590410ft
feet 2.0-3.0845.6 Cross Slope (PAR)SF93855.4to $120 $11,17215590510ft
feet 3.0-4.0858.2 Cross Slope (PAR)SF11859.4to $120 $1,36815590610ft
feet 2.0-3.0863.0 Cross Slope (PAR)SF54868.7to $120 $6,49815590710ft
feet 4.0-5.0868.7 Cross Slope (PAR)SF39872.8to $120 $4,67415590810ft
feet872.8 Cold Patch 29875.8to140530 10 ft
feet872.8 Cold Patch 561931.8to140531 10 ft
feet 2.0-3.0875.8 Cross Slope (PAR)SF31879.1to $120 $3,76215590910ft
feet 4.0-5.0879.1 Cross Slope (PAR)SF66886.0to $120 $7,86615591010ft
feet 2.0-3.0886.0 Cross Slope (PAR)SF31889.3to $120 $3,76215591110ft
feet 2.0-3.0905.6 Cross Slope (PAR)SF10906.6to $120 $1,14015591210ft
feet 2.0-3.0930.0 Cross Slope (PAR)SF17931.8to $120 $2,05215591310ft
$564,195.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:3768 BANDINI BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
500
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
AYERS AVE
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001161259
Run ID
Bandini Blvd
91
ID Sidewalk Width
Priority
feet 5.0-6.00.6 Cross Slope (PAR)SF233.0to $120 $2,73615675010ft
feet 6.0-7.03.3 Cross Slope (PAR)SF225.6to $120 $2,62215675110ft
feet 5.0-6.07.0 Cross Slope (PAR)SF10017.5to $120 $11,97015675210ft
feet 2.0-3.018.6 Cross Slope (PAR)SF1119.8to $120 $1,36815675310ft
feet 4.0-5.020.5 Cross Slope (PAR)SF7528.4to $120 $9,00615675410ft
feet 2.0-3.030.8 Cross Slope (PAR)SF5736.8to $120 $6,84015675510ft
feet 3.0-4.040.0 Cross Slope (PAR)SF5445.7to $120 $6,49815675610ft
feet 2.0-3.045.7 Cross Slope (PAR)SF9455.6to $120 $11,28615675710ft
feet 3.0-4.058.2 Cross Slope (PAR)SF1159.4to $120 $1,36815675810ft
feet 2.0-3.059.4 Cross Slope (PAR)SF2161.6to $120 $2,50815675910ft
feet 4.0-5.062.3 Cross Slope (PAR)SF13376.3to $120 $15,96015676010ft
feet 6.0-7.076.3 Cross Slope (PAR)SF1978.3to $120 $2,28015676110ft
feet 5.0-6.079.2 Cross Slope (PAR)SF11591.3to $120 $13,79415676210ft
feet 2.0-3.093.9 Cross Slope (PAR)SF75101.8to $120 $9,00615676310ft
feet102.3 Driveway139.0to165899
feet 2.0-3.0141.5 Cross Slope (PAR)SF48146.6to $120 $5,81415676410ft
feet 2.0-3.0151.2 Cross Slope (PAR)SF224174.8to $120 $26,90415676510ft
feet 3.0-4.0183.0 Cross Slope (PAR)SF28185.9to $120 $3,30615676610ft
feet 2.0-3.0187.7 Cross Slope (PAR)SF47192.6to $120 $5,58615676710ft
feet 4.0-5.0193.7 Cross Slope (PAR)SF12195.0to $120 $1,48215676810ft
feet 6.0-7.0195.4 Cross Slope (PAR)SF32198.8to $120 $3,87615676910ft
feet 5.0-6.0199.3 Cross Slope (PAR)SF13200.7to $120 $1,59615677010ft
feet200.7 Driveway226.1to165900
feet 2.0-3.0226.9 Cross Slope (PAR)SF123239.8to $120 $14,70615677110ft
feet 2.0-3.0243.1 Cross Slope (PAR)SF78251.3to $120 $9,34815677210ft
feet 4.0-5.0251.9 Cross Slope (PAR)SF99262.3to $120 $11,85615677310ft
feet 2.0-3.0263.0 Cross Slope (PAR)SF206284.7to $120 $24,73815677410ft
feet 3.0-4.0289.7 Cross Slope (PAR)SF35293.4to $120 $4,21815677510ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
501
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
AYERS AVE
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001161259
Run ID
Bandini Blvd
91
ID Sidewalk Width
Priority
feet 2.0-3.0300.7 Cross Slope (PAR)SF86309.8to $120 $10,37415677610ft
feet 3.0-4.0312.2 Cross Slope (PAR)SF14313.7to $120 $1,71015677710ft
feet 2.0-3.0318.8 Cross Slope (PAR)SF109330.3to $120 $13,11015677810ft
feet 3.0-4.0333.6 Cross Slope (PAR)SF10334.6to $120 $1,14015677910ft
feet 2.0-3.0334.6 Cross Slope (PAR)SF16336.3to $120 $1,93815678010ft
feet 3.0-4.0339.9 Cross Slope (PAR)SF51345.3to $120 $6,15615678110ft
feet 2.0-3.0346.8 Cross Slope (PAR)SF339382.5to $120 $40,69815678210ft
feet 2.0-3.0386.4 Cross Slope (PAR)SF10387.5to $120 $1,25415678310ft
feet -.31396.9 Vertical Change LF10397.9to $75 $71313792610ft
feet 2.0-3.0398.1 Cross Slope (PAR)SF154414.3to $120 $18,46815678410ft
feet416.2 Driveway451.3to165901
feet 5.0-6.0452.3 Cross Slope (PAR)SF22454.6to $120 $2,62215678510ft
feet 3.0-4.0455.7 Cross Slope (PAR)SF12457.0to $120 $1,48215678610ft
feet 2.0-3.0457.7 Cross Slope (PAR)SF20459.8to $120 $2,39415678710ft
feet 3.0-4.0464.4 Cross Slope (PAR)SF24466.9to $120 $2,85015678810ft
feet467.3 Cold Patch 35471.0to140548 10 ft
feet 2.0-3.0471.8 Cross Slope (PAR)SF10472.8to $120 $1,14015678910ft
feet 3.0-4.0475.3 Cross Slope (PAR)SF14476.8to $120 $1,71015679010ft
feet 2.0-3.0477.7 Cross Slope (PAR)SF91487.3to $120 $10,94415679110ft
feet 3.0-4.0489.8 Cross Slope (PAR)SF247515.8to $120 $29,64015679210ft
feet .51519.9 Vertical Change SF10520.9to $75 $71313792810ft
feet -.39524.2 Vertical Change LF10525.2to $75 $71313792910ft
feet 3.0-4.0525.9 Cross Slope (PAR)SF37529.8to $120 $4,44615679310ft
feet 2.0-3.0529.8 Cross Slope (PAR)SF14531.3to $120 $1,71015679410ft
feet 3.0-4.0536.8 Cross Slope (PAR)SF131550.6to $120 $15,73215679510ft
feet 2.0-3.0553.3 Cross Slope (PAR)SF10554.4to $120 $1,25415679610ft
feet 3.0-4.0557.9 Cross Slope (PAR)SF91567.5to $120 $10,94415679710ft
feet 2.0-3.0568.9 Cross Slope (PAR)SF12570.2to $120 $1,48215679810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
502
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
AYERS AVE
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001161259
Run ID
Bandini Blvd
91
ID Sidewalk Width
Priority
feet 3.0-4.0573.9 Cross Slope (PAR)SF10575.0to $120 $1,25415679910ft
feet 2.0-3.0575.3 Cross Slope (PAR)SF87584.5to $120 $10,48815680010ft
feet 3.0-4.0586.8 Cross Slope (PAR)SF15588.4to $120 $1,82415680110ft
feet 2.0-3.0592.8 Cross Slope (PAR)SF39596.9to $120 $4,67415680210ft
feet599.8 Driveway647.1to165902
feet599.8 Driveway1199.0to165903
feet .29603.4 Vertical Change REF10604.4to137930 10 ft
feet 2.0-3.0648.2 Cross Slope (Driveway)SF52653.7to $40 $2,09015680310ft
feet 2.0-3.0663.4 Cross Slope (Driveway)SF26666.1to $40 $1,02615680410ft
feet 2.0-3.0682.8 Cross Slope (Driveway)SF48687.9to $40 $1,93815680510ft
feet 2.0-3.0690.8 Cross Slope (Driveway)SF56696.7to $40 $2,24215680610ft
feet 2.19692.0 Vertical Change REF10693.0to137931 10 ft
feet 2.0-3.0699.7 Cross Slope (Driveway)SF10700.8to $40 $41815680710ft
feet 2.0-3.0704.1 Cross Slope (Driveway)SF85713.0to $40 $3,38215680810ft
feet 2.0-3.0716.6 Cross Slope (Driveway)SF357754.2to $40 $14,28815680910ft
feet 2.0-3.0756.3 Cross Slope (Driveway)SF52761.8to $40 $2,09015681010ft
feet 2.0-3.0764.6 Cross Slope (Driveway)SF67771.6to $40 $2,66015681110ft
feet 2.0-3.0774.4 Cross Slope (Driveway)SF279803.8to $40 $11,17215681210ft
feet 2.0-3.0812.5 Cross Slope (Driveway)SF12813.8to $40 $49415681310ft
feet 2.0-3.0818.6 Cross Slope (Driveway)SF29821.7to $40 $1,17815681410ft
feet .26822.2 Vertical Change REF10823.2to137932 10 ft
feet 2.0-3.0827.8 Cross Slope (Driveway)SF190847.8to $40 $7,60015681510ft
feet 2.0-3.0868.2 Cross Slope (Driveway)SF39872.3to $40 $1,55815681610ft
feet 2.0-3.0881.7 Cross Slope (Driveway)SF29884.7to $40 $1,14015681710ft
feet 2.0-3.0887.0 Cross Slope (Driveway)SF179905.8to $40 $7,14415681810ft
feet 2.0-3.0909.7 Cross Slope (Driveway)SF19911.7to $40 $76015681910ft
feet 2.0-3.0918.2 Cross Slope (Driveway)SF37922.1to $40 $1,48215682010ft
feet 2.0-3.0925.3 Cross Slope (Driveway)SF175943.7to $40 $6,99215682110ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
503
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
AYERS AVE
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001161259
Run ID
Bandini Blvd
91
ID Sidewalk Width
Priority
feet 2.0-3.0947.3 Cross Slope (Driveway)SF157963.8to $40 $6,27015682210ft
feet 2.0-3.0967.8 Cross Slope (Driveway)SF31971.1to $40 $1,25415682310ft
feet 2.0-3.0973.8 Cross Slope (Driveway)SF158990.4to $40 $6,30815682410ft
feet 2.0-3.0993.2 Cross Slope (Driveway)SF44997.8to $40 $1,74815682510ft
feet .26998.5 Vertical Change REF10999.5to137933 10 ft
feet 2.0-3.0999.9 Cross Slope (Driveway)SF2041021.4to $40 $8,17015682610ft
feet .281011.3 Vertical Change REF101012.3to137934 10 ft
feet 2.0-3.01036.3 Cross Slope (Driveway)SF1601053.1to $40 $6,38415682710ft
feet 2.0-3.01056.2 Cross Slope (Driveway)SF101057.3to $40 $41815682810ft
feet 2.0-3.01061.0 Cross Slope (Driveway)SF971071.2to $40 $3,87615682910ft
feet 2.0-3.01075.3 Cross Slope (Driveway)SF511080.7to $40 $2,05215683010ft
feet 2.0-3.01086.5 Cross Slope (Driveway)SF1501102.3to $40 $6,00415683110ft
feet 2.0-3.01109.2 Cross Slope (Driveway)SF951119.2to $40 $3,80015683210ft
feet 2.0-3.01122.2 Cross Slope (Driveway)SF2231145.7to $40 $8,93015683310ft
feet 2.0-3.01149.6 Cross Slope (Driveway)SF341153.2to $40 $1,36815683410ft
feet 2.0-3.01158.3 Cross Slope (Driveway)SF1501174.1to $40 $6,00415683510ft
feet 2.0-3.01180.1 Cross Slope (Driveway)SF341183.7to $40 $1,36815683610ft
feet 2.0-3.01185.8 Cross Slope (Driveway)SF671192.8to $40 $2,66015683710ft
feet 2.0-3.01195.0 Cross Slope (Driveway)SF131196.4to $40 $53215683810ft
$551,047.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:AYERS AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
504
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
AYERS AVE
Survey Street Name Starting Street Name
FWY 710 RAMP
End Street Name
2001170951
Run ID
Bandini Blvd
92.25
ID Sidewalk Width
Priority
feet -.581.1 Vertical Change SF82.1to $75 $6381383489ft
feet 4.0-5.06.8 Cross Slope (PAR)SF12221.2to $120 $14,6881588099ft
feet 2.0-3.023.0 Cross Slope (PAR)SF2225.6to $120 $2,6521588109ft
feet 2.0-3.030.6 Cross Slope (PAR)SF6838.6to $120 $8,1601588119ft
feet 4.0-5.038.6 Cross Slope (PAR)SF11652.3to $120 $13,9741588129ft
feet 4.0-5.054.5 Cross Slope (PAR)SF1456.2to $120 $1,7341588139ft
feet 3.0-4.059.9 Cross Slope (PAR)SF1862.0to $120 $2,1421588149ft
feet 2.0-3.062.3 Cross Slope (PAR)SF2665.4to $120 $3,1621588159ft
feet 4.0-5.066.8 Cross Slope (PAR)SF4772.3to $120 $5,6101588169ft
feet 4.0-5.078.8 Cross Slope (PAR)SF5485.2to $120 $6,5281588179ft
feet 6.0-7.085.2 Cross Slope (PAR)SF2588.1to $120 $2,9581588189ft
feet 3.0-4.090.2 Cross Slope (PAR)SF991.3to $120 $1,1221588199ft
feet 2.0-3.091.3 Cross Slope (PAR)SF80100.7to $120 $9,5881588209ft
feet 2.0-3.0102.8 Cross Slope (PAR)SF10104.0to $120 $1,2241588219ft
feet 4.0-5.0104.9 Cross Slope (PAR)SF82114.6to $120 $9,8941588229ft
feet 2.0-3.0116.5 Cross Slope (PAR)SF15118.3to $120 $1,8361588239ft
feet 2.0-3.0121.8 Cross Slope (PAR)SF12123.2to $120 $1,4281588249ft
feet 3.0-4.0128.4 Cross Slope (PAR)SF80137.8to $120 $9,5881588259ft
feet 2.0-3.0139.2 Cross Slope (PAR)SF79148.5to $120 $9,4861588269ft
feet 3.0-4.0154.5 Cross Slope (PAR)SF22157.1to $120 $2,6521588279ft
feet 2.0-3.0157.4 Cross Slope (PAR)SF43162.4to $120 $5,1001588289ft
feet 2.0-3.0165.9 Cross Slope (PAR)SF36170.1to $120 $4,2841588299ft
feet 3.0-4.0174.0 Cross Slope (PAR)SF75182.8to $120 $8,9761588309ft
feet185.8 Driveway258.7to166001
feet -.29257.6 Vertical Change REF9258.6to138349 9 ft
feet 4.0-5.0261.2 Cross Slope (PAR)SF80270.6to $120 $9,5881588319ft
feet 4.0-5.0274.3 Cross Slope (PAR)SF72282.8to $120 $8,6701588329ft
feet 5.0-6.0285.9 Cross Slope (PAR)SF9286.9to $120 $1,0201588339ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
505
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
AYERS AVE
Survey Street Name Starting Street Name
FWY 710 RAMP
End Street Name
2001170951
Run ID
Bandini Blvd
92.25
ID Sidewalk Width
Priority
feet 7.0-8.0290.3 Cross Slope (PAR)SF19292.5to $120 $2,2441588349ft
feet 4.0-5.0293.5 Cross Slope (PAR)SF28296.8to $120 $3,3661588359ft
feet 4.0-5.0299.3 Cross Slope (PAR)SF16301.2to $120 $1,9381588369ft
feet 4.0-5.0304.0 Cross Slope (PAR)SF13305.5to $120 $1,5301588379ft
feet 4.0-5.0309.1 Cross Slope (PAR)SF23311.8to $120 $2,7541588389ft
feet 2.0-3.0314.0 Cross Slope (PAR)SF86324.1to $120 $10,3021588399ft
feet 1.04324.8 Vertical Change SF9325.8to $75 $6381383509ft
feet 2.0-3.0327.7 Cross Slope (PAR)SF11329.0to $120 $1,3261588409ft
feet 5.0-6.0327.8 Running Slope REF10329.0to166631 9 ft
feet329.0 Driveway354.4to166002
feet .52340.6 Vertical Change REF9341.6to138351 9 ft
feet 3.0-4.0357.1 Cross Slope (PAR)SF18359.2to $120 $2,1421588419ft
feet 3.0-4.0361.8 Cross Slope (PAR)SF9362.9to $120 $1,1221588429ft
feet 3.0-4.0365.6 Cross Slope (PAR)SF52371.7to $120 $6,2221588439ft
feet -.31370.3 Vertical Change REF9371.3to138352 9 ft
feet 3.0-4.0378.0 Cross Slope (PAR)SF11379.3to $120 $1,3261588449ft
feet 2.0-3.0381.6 Cross Slope (PAR)SF9382.7to $120 $1,1221588459ft
feet 6.0-7.0389.6 Cross Slope (PAR)SF24392.4to $120 $2,8561588469ft
feet 5.0-6.0393.7 Cross Slope (PAR)SF17395.7to $120 $2,0401588479ft
feet 3.0-4.0398.4 Cross Slope (PAR)SF24401.2to $120 $2,8561588489ft
feet 2.0-3.0402.3 Cross Slope (PAR)SF13403.8to $120 $1,5301588499ft
feet404.5 Driveway447.9to166003
feet .45437.2 Vertical Change REF9438.2to138353 9 ft
feet 3.0-4.0447.9 Cross Slope (Driveway)SF52454.0to $40 $2,0741588509ft
feet -.29449.9 Vertical Change REF9450.9to138355 9 ft
$194,089.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:AYERS AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
506
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
2001161615
Run ID
Bandini Blvd
88
ID Sidewalk Width
Priority
feet 2.0-3.013.0 Cross Slope (PAR)SF1614.7to $120 $1,93815601410ft
feet 2.0-3.018.2 Cross Slope (PAR)SF3321.7to $120 $3,99015601510ft
feet 2.0-3.032.4 Cross Slope (PAR)SF1433.9to $120 $1,71015601610ft
feet 3.0-4.041.8 Cross Slope (PAR)SF1243.1to $120 $1,48215601710ft
feet 2.0-3.043.1 Cross Slope (PAR)SF21365.5to $120 $25,53615601810ft
feet65.5 Cold Patch 3369.0to140532 10 ft
feet69.4 Continuous Width REF1070.4to167360 10 ft
feet 3.0-4.070.9 Cross Slope (PAR)SF3274.3to $120 $3,87615601910ft
feet 2.0-3.074.8 Cross Slope (PAR)SF1075.9to $120 $1,25415602010ft
feet 2.0-3.078.0 Cross Slope (PAR)SF18597.5to $120 $22,23015602110ft
feet 2.0-3.099.6 Cross Slope (PAR)SF66106.5to $120 $7,86615602210ft
feet 3.0-4.0114.0 Cross Slope (PAR)SF283143.8to $120 $33,97215602310ft
feet 2.0-3.0144.6 Cross Slope (PAR)SF13146.0to $120 $1,59615602410ft
feet 2.0-3.0148.3 Cross Slope (PAR)SF159165.0to $120 $19,03815602510ft
feet 4.0-5.0166.6 Cross Slope (PAR)SF114178.6to $120 $13,68015602610ft
feet 2.0-3.0178.6 Cross Slope (PAR)SF17180.4to $120 $2,05215602710ft
feet180.7 Cold Patch 52186.2to140533 10 ft
feet 1.89181.3 Vertical Change SF10182.3to $75 $71313777910ft
feet 1.37183.0 Vertical Change SF10184.0to $75 $71313778010ft
feet .31184.9 Vertical Change LF10185.9to $75 $71313778110ft
feet187.5 Driveway238.6to165853
feet 3.0-4.0241.5 Cross Slope (PAR)SF92251.2to $120 $11,05815602810ft
feet 3.0-4.0256.2 Cross Slope (PAR)SF13257.6to $120 $1,59615602910ft
feet 2.0-3.0263.8 Cross Slope (PAR)SF20265.9to $120 $2,39415603010ft
feet 2.0-3.0273.7 Cross Slope (PAR)SF31277.0to $120 $3,76215603110ft
feet 2.0-3.0280.3 Cross Slope (PAR)SF20282.4to $120 $2,39415603210ft
feet 2.0-3.0286.2 Cross Slope (PAR)SF29289.2to $120 $3,42015603310ft
feet 2.0-3.0291.6 Cross Slope (PAR)SF124304.6to $120 $14,82015603410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
507
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
2001161615
Run ID
Bandini Blvd
88
ID Sidewalk Width
Priority
feet 3.0-4.0306.8 Cross Slope (PAR)SF10307.9to $120 $1,25415603510ft
feet 2.0-3.0308.7 Cross Slope (PAR)SF27311.5to $120 $3,19215603610ft
feet 3.0-4.0315.3 Cross Slope (PAR)SF14316.8to $120 $1,71015603710ft
feet 3.0-4.0325.3 Cross Slope (PAR)SF29328.4to $120 $3,53415603810ft
feet329.6 Driveway373.0to165854
feet 3.0-4.0374.8 Cross Slope (PAR)SF88384.1to $120 $10,60215603910ft
feet .35385.8 Vertical Change LF10386.8to $75 $71313778210ft
feet 2.0-3.0389.5 Cross Slope (PAR)SF12390.8to $120 $1,48215604010ft
feet 2.0-3.0394.2 Cross Slope (PAR)SF10395.3to $120 $1,25415604110ft
feet 3.0-4.0407.7 Cross Slope (PAR)SF23410.1to $120 $2,73615604210ft
feet 3.0-4.0414.4 Cross Slope (PAR)SF15416.0to $120 $1,82415604310ft
feet 2.0-3.0416.0 Cross Slope (PAR)SF20418.1to $120 $2,39415604410ft
feet 3.0-4.0421.5 Cross Slope (PAR)SF29424.6to $120 $3,53415604510ft
feet 3.0-4.0428.1 Cross Slope (PAR)SF19430.1to $120 $2,28015604610ft
feet 3.0-4.0433.8 Cross Slope (PAR)SF55439.6to $120 $6,61215604710ft
feet 5.0-6.0447.8 Cross Slope (PAR)SF29450.9to $120 $3,53415604810ft
feet -.47449.5 Vertical Change REF10450.5to137783 10 ft
feet 3.0-4.0451.3 Cross Slope (PAR)SF33454.8to $120 $3,99015604910ft
feet455.6 Driveway499.8to165855
feet 3.0-4.0500.4 Cross Slope (Driveway)SF87509.6to $40 $3,49615605010ft
feet 5.0-6.0509.8 Cross Slope (PAR)SF81518.3to $120 $9,69015605110ft
feet 2.0-3.0522.8 Cross Slope (PAR)SF102533.5to $120 $12,19815605210ft
feet .57536.1 Vertical Change SF10537.1to $75 $71313778410ft
feet 2.0-3.0538.8 Cross Slope (PAR)SF28541.7to $120 $3,30615605310ft
feet -.35540.0 Vertical Change REF10541.0to137785 10 ft
feet 3.0-4.0546.7 Cross Slope (PAR)SF16548.4to $120 $1,93815605410ft
feet 2.0-3.0548.4 Cross Slope (PAR)SF42552.8to $120 $5,01615605510ft
feet 4.0-5.0553.5 Cross Slope (PAR)SF13554.9to $120 $1,59615605610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
508
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
BANDINI BLVD
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
2001161615
Run ID
Bandini Blvd
88
ID Sidewalk Width
Priority
feet557.8 Cold Patch 84566.6to140534 10 ft
feet -.37559.1 Vertical Change LF10560.1to $75 $71313778610ft
feet 3.0-4.0569.8 Cross Slope (PAR)SF25572.4to $120 $2,96415605710ft
feet 3.0-4.0574.8 Cross Slope (PAR)SF14576.3to $120 $1,71015605810ft
feet 2.0-3.0576.3 Cross Slope (PAR)SF17578.1to $120 $2,05215605910ft
feet 2.0-3.0583.6 Cross Slope (PAR)SF126596.9to $120 $15,16215606010ft
feet 2.0-3.0599.0 Cross Slope (PAR)SF20601.1to $120 $2,39415606110ft
feet 3.0-4.0605.3 Cross Slope (PAR)SF60611.6to $120 $7,18215606210ft
feet 2.0-3.0612.5 Cross Slope (PAR)SF46617.3to $120 $5,47215606310ft
feet 3.0-4.0620.1 Cross Slope (PAR)SF194640.5to $120 $23,25615606410ft
feet .69632.1 Vertical Change REF10633.1to137787 10 ft
feet 5.0-6.0643.2 Cross Slope (PAR)SF33646.7to $120 $3,99015606510ft
feet 2.0-3.0648.6 Cross Slope (PAR)SF10649.7to $120 $1,25415606610ft
feet 2.0-3.0653.0 Cross Slope (PAR)SF20655.1to $120 $2,39415606710ft
feet .28663.6 Vertical Change LF10664.6to $75 $71313778810ft
feet 2.0-3.0666.5 Cross Slope (PAR)SF15668.1to $120 $1,82415606810ft
feet -.67668.1 Vertical Change REF10669.1to137789 10 ft
feet 4.0-5.0672.0 Cross Slope (PAR)SF22674.3to $120 $2,62215606910ft
feet 2.0-3.0677.3 Cross Slope (PAR)SF38681.3to $120 $4,56015607010ft
feet -.32677.9 Vertical Change REF10678.9to137790 10 ft
$348,659.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:BANDINI BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
509
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
BONNIE BEACH PL
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161319
Run ID
Bandini Blvd
66.25
ID Sidewalk Width
Priority
feet 3.0-4.00.4 Cross Slope (PAR)SF859.3to $120 $10,14615665910ft
feet 3.0-4.011.8 Cross Slope (PAR)SF9221.5to $120 $11,05815666010ft
feet 2.0-3.022.5 Cross Slope (PAR)SF2725.3to $120 $3,19215666110ft
feet 4.0-5.028.1 Cross Slope (PAR)SF1229.4to $120 $1,48215666210ft
feet 4.0-5.031.8 Cross Slope (PAR)SF8340.5to $120 $9,91815666310ft
feet 2.0-3.040.8 Cross Slope (PAR)SF1342.2to $120 $1,59615666410ft
feet 3.0-4.066.8 Cross Slope (PAR)SF2269.1to $120 $2,62215666510ft
feet 3.0-4.072.9 Cross Slope (PAR)SF2475.4to $120 $2,85015666610ft
feet 2.0-3.076.0 Cross Slope (PAR)SF3880.0to $120 $4,56015666710ft
feet 2.0-3.082.7 Cross Slope (PAR)SF1384.1to $120 $1,59615666810ft
feet 2.0-3.090.4 Cross Slope (PAR)SF4294.8to $120 $5,01615666910ft
feet 2.0-3.097.7 Cross Slope (PAR)SF48102.7to $120 $5,70015667010ft
feet 4.0-5.0103.8 Cross Slope (PAR)SF58109.9to $120 $6,95415667110ft
feet 2.0-3.0109.9 Cross Slope (PAR)SF44114.5to $120 $5,24415667210ft
feet 2.0-3.0117.6 Cross Slope (PAR)SF19119.6to $120 $2,28015667310ft
feet 2.0-3.0122.7 Cross Slope (PAR)SF65129.5to $120 $7,75215667410ft
feet 2.0-3.0134.9 Cross Slope (PAR)SF56140.8to $120 $6,72615667510ft
feet 4.0-5.0143.0 Cross Slope (PAR)SF11144.2to $120 $1,36815667610ft
feet147.5 Driveway200.2to165889
feet 4.0-5.0200.2 Cross Slope (Driveway)SF12201.5to $40 $49415667710ft
feet 2.0-3.0204.2 Cross Slope (PAR)SF54209.9to $120 $6,49815667810ft
feet209.9 Cold Patch 29212.9to140546 10 ft
feet 3.0-4.0213.1 Cross Slope (PAR)SF16214.8to $120 $1,93815667910ft
feet -.34214.3 Vertical Change REF10215.3to137913 10 ft
feet 2.0-3.0216.3 Cross Slope (PAR)SF19218.3to $120 $2,28015668010ft
feet 2.0-3.0224.4 Cross Slope (PAR)SF83233.1to $120 $9,91815668110ft
feet 2.0-3.0235.8 Cross Slope (PAR)SF24238.3to $120 $2,85015668210ft
feet 3.0-4.0242.5 Cross Slope (PAR)SF24245.0to $120 $2,85015668310ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
510
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
BONNIE BEACH PL
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161319
Run ID
Bandini Blvd
66.25
ID Sidewalk Width
Priority
feet 2.0-3.0245.8 Cross Slope (PAR)SF123258.7to $120 $14,70615668410ft
feet 4.0-5.0258.7 Cross Slope (PAR)SF30261.9to $120 $3,64815668510ft
feet 2.0-3.0266.3 Cross Slope (PAR)SF235291.0to $120 $28,15815668610ft
feet .47295.8 Vertical Change REF10296.8to137914 10 ft
feet 2.0-3.0296.8 Cross Slope (PAR)SF77304.9to $120 $9,23415668710ft
feet 2.0-3.0311.3 Cross Slope (PAR)SF43315.8to $120 $5,13015668810ft
feet 3.39317.4 Vertical Change SF10318.4to $75 $71313791510ft
feet318.8 Driveway341.6to165890
feet 3.0-4.0342.7 Cross Slope (PAR)SF26345.4to $120 $3,07815668910ft
feet 5.0-6.0348.4 Cross Slope (PAR)SF42352.8to $120 $5,01615669010ft
feet .29350.2 Vertical Change LF10351.2to $75 $71313791610ft
feet 3.0-4.0354.3 Cross Slope (PAR)SF158370.9to $120 $18,92415669110ft
feet 2.0-3.0387.0 Cross Slope (PAR)SF292417.7to $120 $34,99815669210ft
feet 3.0-4.0419.8 Cross Slope (PAR)SF86428.8to $120 $10,26015669310ft
feet .27432.2 Vertical Change REF10433.2to137917 10 ft
feet 2.0-3.0432.9 Cross Slope (PAR)SF25435.5to $120 $2,96415669410ft
feet 3.0-4.0444.3 Cross Slope (PAR)SF88453.6to $120 $10,60215669510ft
feet 2.0-3.0453.8 Cross Slope (PAR)SF164471.1to $120 $19,72215669610ft
feet 1.53461.7 Vertical Change REF10462.7to137918 10 ft
feet476.1 Driveway515.4to165891
feet .3512.8 Vertical Change REF10513.8to137919 10 ft
feet 2.0-3.0519.5 Cross Slope (PAR)SF40523.7to $120 $4,78815669710ft
feet525.3 Driveway563.3to165892
feet 5.0-6.0563.3 Cross Slope (Driveway)SF119575.8to $40 $4,75015669810ft
feet 4.0-5.0578.3 Cross Slope (PAR)SF223601.8to $120 $26,79015669910ft
feet 2.0-3.0602.3 Cross Slope (PAR)SF11603.5to $120 $1,36815670010ft
feet 2.0-3.0606.2 Cross Slope (PAR)SF44610.8to $120 $5,24415670110ft
feet611.5 Driveway683.8to165893
feet .32634.4 Vertical Change REF10635.4to137920 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
511
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
BONNIE BEACH PL
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161319
Run ID
Bandini Blvd
66.25
ID Sidewalk Width
Priority
feet 4.0-5.0683.8 Cross Slope (Driveway)SF176702.3to $40 $7,03015670210ft
feet 2.0-3.0702.3 Cross Slope (PAR)SF74710.1to $120 $8,89215670310ft
feet 4.0-5.0711.5 Cross Slope (PAR)SF148727.1to $120 $17,78415670410ft
feet 2.0-3.0727.1 Cross Slope (PAR)SF49732.3to $120 $5,92815670510ft
feet 5.0-6.0733.8 Running Slope SF10734.8to $120 $1,14016656110ft
feet736.5 Cold Patch 26739.2to140547 10 ft
feet .26737.8 Vertical Change LF25740.4to $75 $1,85313792110ft
feet 5.0-6.0741.7 Cross Slope (PAR)SF10742.8to $120 $1,25415670610ft
feet 5.0-6.0745.0 Cross Slope (PAR)SF23747.4to $120 $2,73615670710ft
feet748.6 Driveway775.0to165894
feet748.6 Driveway876.9to165895
feet 2.0-3.0779.5 Cross Slope (Driveway)SF26782.2to $40 $1,02615670810ft
feet 4.0-5.0783.3 Cross Slope (Driveway)SF143798.3to $40 $5,70015670910ft
feet 3.0-4.0804.4 Cross Slope (Driveway)SF162821.5to $40 $6,49815671010ft
feet .67809.1 Vertical Change REF10810.1to137922 10 ft
feet 2.0-3.0823.3 Cross Slope (Driveway)SF10824.3to $40 $38015671110ft
feet 2.0-3.0831.7 Cross Slope (Driveway)SF36835.5to $40 $1,44415671210ft
feet 5.0-6.0836.4 Cross Slope (Driveway)SF13837.8to $40 $53215671310ft
feet 2.0-3.0843.1 Cross Slope (Driveway)SF195863.6to $40 $7,79015671410ft
feet 1.26864.6 Vertical Change REF10865.6to137923 10 ft
$397,679.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:BONNIE BEACH PL
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
512
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
BONNIE BEACH PL
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001171114
Run ID
Bandini Blvd
36
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF656.8to $120 $7,75215830610ft
feet 4.0-5.013.3 Cross Slope (PAR)SF5819.4to $120 $6,95415830710ft
feet 2.0-3.021.2 Cross Slope (PAR)SF9130.8to $120 $10,94415830810ft
feet .8931.8 Vertical Change SF932.8to $75 $71313819810ft
feet32.3 Driveway66.9to165966
feet 3.0-4.068.8 Cross Slope (PAR)SF1570.4to $120 $1,82415830910ft
feet72.8 Driveway104.0to165967
feet 3.0-4.0105.2 Cross Slope (PAR)SF66112.1to $120 $7,86615831010ft
feet 2.0-3.0112.1 Cross Slope (PAR)SF156128.5to $120 $18,69615831110ft
feet 2.0-3.0130.8 Cross Slope (PAR)SF14132.3to $120 $1,71015831210ft
feet 4.0-5.0133.6 Cross Slope (PAR)SF36137.4to $120 $4,33215831310ft
feet 3.0-4.0139.9 Cross Slope (PAR)SF86148.9to $120 $10,26015831410ft
feet .5150.0 Vertical Change SF10151.0to $75 $71313819910ft
feet 4.0-5.0151.9 Cross Slope (PAR)SF23154.3to $120 $2,73615831510ft
feet 2.0-3.0155.8 Cross Slope (PAR)SF19157.8to $120 $2,28015831610ft
feet 2.0-3.0166.2 Cross Slope (PAR)SF32169.6to $120 $3,87615831710ft
feet 4.0-5.0174.0 Cross Slope (PAR)SF48179.1to $120 $5,81415831810ft
feet 2.0-3.0180.8 Cross Slope (PAR)SF48185.8to $120 $5,70015831910ft
feet 4.0-5.0186.3 Cross Slope (PAR)SF32189.7to $120 $3,87615832010ft
feet 2.0-3.0191.3 Cross Slope (PAR)SF33194.8to $120 $3,99015832110ft
feet 3.0-4.0197.7 Cross Slope (PAR)SF55203.5to $120 $6,61215832210ft
feet 3.0-4.0214.4 Cross Slope (PAR)SF58220.5to $120 $6,95415832310ft
feet 2.0-3.0221.5 Cross Slope (PAR)SF53227.1to $120 $6,38415832410ft
feet 3.0-4.0231.8 Cross Slope (PAR)SF10232.8to $120 $1,14015832510ft
feet 2.0-3.0232.8 Cross Slope (PAR)SF43237.3to $120 $5,13015832610ft
feet 2.0-3.0240.8 Cross Slope (PAR)SF12242.1to $120 $1,48215832710ft
feet 2.0-3.0245.2 Cross Slope (PAR)SF103256.0to $120 $12,31215832810ft
feet 2.0-3.0258.1 Cross Slope (PAR)SF67265.2to $120 $8,09415832910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
513
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
BONNIE BEACH PL
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001171114
Run ID
Bandini Blvd
36
ID Sidewalk Width
Priority
feet 2.0-3.0287.6 Cross Slope (PAR)SF48292.7to $120 $5,81415833010ft
feet 2.0-3.0302.2 Cross Slope (PAR)SF23304.6to $120 $2,73615833110ft
feet 3.0-4.0307.0 Cross Slope (PAR)SF36310.8to $120 $4,33215833210ft
feet324.3 Driveway358.5to165968
feet 2.65350.0 Vertical Change REF10351.0to138200 10 ft
feet 2.0-3.0358.8 Cross Slope (PAR)SF50364.1to $120 $6,04215833310ft
feet 4.0-5.0368.0 Cross Slope (PAR)SF26370.7to $120 $3,07815833410ft
feet 2.0-3.0375.1 Cross Slope (PAR)SF35378.8to $120 $4,21815833510ft
feet380.3 Driveway400.7to165969
feet380.3 Driveway587.4to165970
feet 3.53387.5 Vertical Change REF10388.5to138201 10 ft
feet 2.0-3.0403.0 Cross Slope (Driveway)SF89412.4to $40 $3,57215833610ft
feet 3.0-4.0416.6 Cross Slope (Driveway)SF17418.4to $40 $68415833710ft
feet 2.0-3.0419.2 Cross Slope (Driveway)SF50424.5to $40 $2,01415833810ft
feet 4.0-5.0430.0 Cross Slope (Driveway)SF29433.0to $40 $1,14015833910ft
feet 2.0-3.0434.0 Cross Slope (Driveway)SF43438.5to $40 $1,71015834010ft
feet 2.0-3.0440.6 Cross Slope (Driveway)SF45445.3to $40 $1,78615834110ft
feet -.28445.0 Vertical Change REF10446.0to138202 10 ft
feet 2.0-3.0457.7 Cross Slope (Driveway)SF10458.8to $40 $41815834210ft
feet .41462.4 Vertical Change REF10463.4to138203 10 ft
feet 2.0-3.0462.4 Cross Slope (Driveway)SF38466.4to $40 $1,52015834310ft
feet 3.0-4.0468.8 Cross Slope (Driveway)SF65475.6to $40 $2,58415834410ft
feet 2.0-3.0480.9 Cross Slope (Driveway)SF81489.4to $40 $3,23015834510ft
feet 2.0-3.0492.6 Cross Slope (Driveway)SF117504.9to $40 $4,67415834610ft
feet 2.0-3.0507.1 Cross Slope (Driveway)SF57513.1to $40 $2,28015834710ft
feet 4.0-5.0513.1 Cross Slope (Driveway)SF24515.6to $40 $95015834810ft
feet 2.0-3.0515.6 Cross Slope (Driveway)SF39519.7to $40 $1,55815834910ft
feet 3.0-4.0524.0 Cross Slope (Driveway)SF42528.4to $40 $1,67215835010ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
514
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
BONNIE BEACH PL
Survey Street Name Starting Street Name
S SUNOL DR
End Street Name
2001171114
Run ID
Bandini Blvd
36
ID Sidewalk Width
Priority
feet 2.0-3.0530.7 Cross Slope (Driveway)SF15532.3to $40 $60815835110ft
feet .28535.3 Vertical Change REF10536.3to138204 10 ft
feet 3.0-4.0538.8 Cross Slope (Driveway)SF19540.8to $40 $76015835210ft
feet 2.0-3.0540.8 Cross Slope (Driveway)SF10541.9to $40 $41815835310ft
feet 2.0-3.0552.8 Cross Slope (Driveway)SF14554.3to $40 $57015835410ft
feet 3.0-4.0564.9 Cross Slope (Driveway)SF45569.6to $40 $1,78615835510ft
feet 2.0-3.0569.6 Cross Slope (Driveway)SF83578.3to $40 $3,30615835610ft
feet 4.0-5.0580.0 Cross Slope (Driveway)SF39584.1to $40 $1,55815835710ft
feet 2.0-3.0585.5 Cross Slope (Driveway)SF10586.5to $40 $38015835810ft
$213,541.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:BONNIE BEACH PL
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
515
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
CITY BOUNDARY
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151306
Run ID
Bandini Blvd
68.25
ID Sidewalk Width
Priority
feet 3.0-4.01.6 Cross Slope (PAR)SF548.8to $120 $6,4801549788ft
feet 2.0-3.08.8 Cross Slope (PAR)SF6417.3to $120 $7,6501549798ft
feet 2.0-3.022.8 Cross Slope (PAR)SF1024.1to $120 $1,1701549808ft
feet 3.0-4.026.5 Cross Slope (PAR)SF1027.8to $120 $1,1701549818ft
feet 5.0-6.027.9 Running Slope SF1029.2to $120 $1,1701665278ft
feet29.2 Driveway46.9to165783
feet 3.0-4.048.8 Cross Slope (PAR)SF6056.8to $120 $7,2001549828ft
feet 5.0-6.058.3 Cross Slope (PAR)SF2061.0to $120 $2,4301549838ft
feet 3.0-4.078.5 Cross Slope (PAR)SF1981.1to $120 $2,3401549848ft
feet 2.0-3.087.3 Cross Slope (PAR)SF2390.4to $120 $2,7901549858ft
feet .27102.3 Vertical Change LF8103.3to $75 $5631375898ft
feet 2.0-3.0106.8 Cross Slope (PAR)SF26110.3to $120 $3,1501549868ft
feet .53109.1 Vertical Change REF8110.1to137590 8 ft
feet 2.0-3.0138.8 Cross Slope (PAR)SF43144.6to $120 $5,2201549878ft
feet 3.0-4.0148.6 Cross Slope (PAR)SF40153.9to $120 $4,7701549888ft
feet 2.0-3.0153.9 Cross Slope (PAR)SF8154.9to $120 $9001549898ft
feet 2.0-3.0157.2 Cross Slope (PAR)SF26160.6to $120 $3,0601549908ft
feet 2.0-3.0167.1 Cross Slope (PAR)SF207194.7to $120 $24,8401549918ft
feet 2.0-3.0201.8 Cross Slope (PAR)SF42207.4to $120 $5,0401549928ft
feet 2.0-3.0210.1 Cross Slope (PAR)SF20212.8to $120 $2,4301549938ft
feet 2.0-3.0232.8 Cross Slope (PAR)SF25236.1to $120 $2,9701549948ft
feet 2.0-3.0239.3 Cross Slope (PAR)SF71248.8to $120 $8,5501549958ft
feet 3.0-4.0253.4 Cross Slope (PAR)SF11254.8to $120 $1,2601549968ft
feet 5.0-6.0256.1 Cross Slope (PAR)SF20258.8to $120 $2,4301549978ft
feet 6.0-7.0259.8 Cross Slope (PAR)SF11261.3to $120 $1,3501549988ft
feet 2.0-3.0267.1 Cross Slope (PAR)SF27270.7to $120 $3,2401549998ft
feet 2.0-3.0282.9 Cross Slope (PAR)SF52289.8to $120 $6,2101550008ft
feet 2.0-3.0293.8 Cross Slope (PAR)SF120309.8to $120 $14,4001550018ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
516
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
CITY BOUNDARY
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151306
Run ID
Bandini Blvd
68.25
ID Sidewalk Width
Priority
feet 2.0-3.0314.8 Cross Slope (PAR)SF47321.0to $120 $5,5801550028ft
feet 4.0-5.0321.0 Cross Slope (PAR)SF30325.0to $120 $3,6001550038ft
feet 2.0-3.0328.8 Cross Slope (PAR)SF15330.8to $120 $1,8001550048ft
feet 3.0-4.0337.0 Cross Slope (PAR)SF17339.2to $120 $1,9801550058ft
feet 2.0-3.0339.3 Cross Slope (PAR)SF20341.9to $120 $2,3401550068ft
feet 2.0-3.0345.7 Cross Slope (PAR)SF246378.5to $120 $29,5201550078ft
feet 2.0-3.0382.3 Cross Slope (PAR)SF11383.7to $120 $1,2601550088ft
feet 2.0-3.0391.3 Cross Slope (PAR)SF10392.6to $120 $1,1701550098ft
feet 2.0-3.0397.5 Cross Slope (PAR)SF96410.3to $120 $11,5201550108ft
feet 2.0-3.0418.0 Cross Slope (PAR)SF9419.2to $120 $1,0801550118ft
feet 2.0-3.0448.9 Cross Slope (PAR)SF16451.0to $120 $1,8901550128ft
feet 2.0-3.0455.9 Cross Slope (PAR)SF17458.1to $120 $1,9801550138ft
feet478.3 Driveway533.1to165784
feet .3484.7 Vertical Change REF8485.7to137591 8 ft
feet .27491.3 Vertical Change REF8492.3to137592 8 ft
feet .29497.6 Vertical Change REF8498.6to137593 8 ft
feet .4512.3 Vertical Change REF8513.3to137594 8 ft
feet .36520.8 Vertical Change REF8521.8to137595 8 ft
feet 3.0-4.0534.3 Cross Slope (PAR)SF62542.6to $120 $7,4701550148ft
feet 3.0-4.0545.8 Cross Slope (PAR)SF67554.7to $120 $8,0101550158ft
feet 2.0-3.0554.7 Cross Slope (PAR)SF22557.6to $120 $2,6101550168ft
feet 2.0-3.0559.8 Cross Slope (PAR)SF68568.9to $120 $8,1901550178ft
feet 4.0-5.0570.8 Cross Slope (PAR)SF30574.8to $120 $3,6001550188ft
feet 2.0-3.0575.1 Cross Slope (PAR)SF39580.3to $120 $4,6801550198ft
feet 3.0-4.0584.6 Cross Slope (PAR)SF18587.0to $120 $2,1601550208ft
feet 2.0-3.0588.1 Cross Slope (PAR)SF43593.8to $120 $5,1301550218ft
feet 3.0-4.0596.3 Cross Slope (PAR)SF35600.9to $120 $4,1401550228ft
feet 3.0-4.0603.2 Cross Slope (PAR)SF56610.7to $120 $6,7501550238ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
517
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
CITY BOUNDARY
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151306
Run ID
Bandini Blvd
68.25
ID Sidewalk Width
Priority
feet 2.0-3.0611.8 Cross Slope (PAR)SF24615.0to $120 $2,8801550248ft
feet 2.0-3.0621.2 Cross Slope (PAR)SF132638.8to $120 $15,8401550258ft
feet .31637.9 Vertical Change REF8638.9to137596 8 ft
feet 4.0-5.0638.8 Cross Slope (PAR)SF64647.3to $120 $7,6501550268ft
feet 2.0-3.0647.4 Cross Slope (PAR)SF37652.3to $120 $4,4101550278ft
feet 2.0-3.0658.0 Cross Slope (PAR)SF33662.4to $120 $3,9601550288ft
feet 3.0-4.0664.7 Cross Slope (PAR)SF56672.2to $120 $6,7501550298ft
feet 2.0-3.0672.2 Cross Slope (PAR)SF86683.7to $120 $10,3501550308ft
feet 3.0-4.0686.2 Cross Slope (PAR)SF51693.0to $120 $6,1201550318ft
feet 2.0-3.0693.7 Cross Slope (PAR)SF10695.0to $120 $1,1701550328ft
feet 4.0-5.0697.4 Cross Slope (PAR)SF236728.8to $120 $28,2601550338ft
feet 2.0-3.0729.4 Cross Slope (PAR)SF28733.1to $120 $3,3301550348ft
feet 4.0-5.0733.1 Cross Slope (PAR)SF38738.1to $120 $4,5001550358ft
feet 2.0-3.0738.3 Cross Slope (PAR)SF32742.6to $120 $3,8701550368ft
feet749.5 Driveway782.6to165785
feet -.27749.7 Vertical Change REF8750.7to137597 8 ft
feet 3.0-4.0782.8 Cross Slope (Driveway)SF65791.5to $40 $2,6101550378ft
feet 3.0-4.0793.8 Cross Slope (PAR)SF23796.8to $120 $2,7001550388ft
feet 2.0-3.0797.8 Cross Slope (PAR)SF110812.4to $120 $13,1401550398ft
feet 2.0-3.0816.1 Cross Slope (PAR)SF23819.1to $120 $2,7001550408ft
feet 3.0-4.0822.4 Cross Slope (PAR)SF8823.4to $120 $9001550418ft
feet 2.0-3.0828.2 Cross Slope (PAR)SF8829.3to $120 $9901550428ft
feet 2.0-3.0834.6 Cross Slope (PAR)SF47840.8to $120 $5,5801550438ft
feet 2.0-3.0845.1 Cross Slope (PAR)SF97858.0to $120 $11,6101550448ft
feet 4.0-5.0858.8 Cross Slope (PAR)SF247891.7to $120 $29,6101550458ft
feet -.26895.7 Vertical Change LF8896.7to $75 $5631375988ft
feet895.7 Driveway931.1to165786
feet895.7 Driveway1106.1to165787
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
518
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
CITY BOUNDARY
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151306
Run ID
Bandini Blvd
68.25
ID Sidewalk Width
Priority
feet 4.0-5.0932.2 Cross Slope (Driveway)SF90944.2to $40 $3,6001550468ft
feet 2.0-3.0944.2 Cross Slope (Driveway)SF14946.1to $40 $5701550478ft
feet 3.0-4.0954.3 Cross Slope (Driveway)SF10955.6to $40 $3901550488ft
feet 3.0-4.0957.9 Cross Slope (Driveway)SF32962.1to $40 $1,2601550498ft
feet 2.0-3.0962.1 Cross Slope (Driveway)SF134980.0to $40 $5,3701550508ft
feet 2.0-3.0982.5 Cross Slope (Driveway)SF1531002.9to $40 $6,1201550518ft
feet 4.0-5.01003.1 Cross Slope (Driveway)SF611011.2to $40 $2,4301550528ft
feet 2.0-3.01011.2 Cross Slope (Driveway)SF441017.0to $40 $1,7401550538ft
feet 4.0-5.01017.9 Cross Slope (Driveway)SF221020.8to $40 $8701550548ft
feet 2.0-3.01021.5 Cross Slope (Driveway)SF481027.9to $40 $1,9201550558ft
feet 3.0-4.01030.4 Cross Slope (Driveway)SF491037.0to $40 $1,9801550568ft
feet 2.0-3.01039.0 Cross Slope (Driveway)SF1341056.8to $40 $5,3401550578ft
feet 3.0-4.01060.1 Cross Slope (Driveway)SF1911085.6to $40 $7,6501550588ft
feet 5.0-6.01085.6 Cross Slope (Driveway)SF781096.0to $40 $3,1201550598ft
feet 3.0-4.01096.0 Cross Slope (Driveway)SF171098.3to $40 $6901550608ft
feet 5.0-6.01099.6 Cross Slope (Driveway)SF491106.1to $40 $1,9501550618ft
$453,735.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:CITY BOUNDARY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
519
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
CITY BOUNDARY
Survey Street Name Starting Street Name
PENNINGTON WY
End Street Name
2001161130
Run ID
Bandini Blvd
41.25
ID Sidewalk Width
Priority
feet 4.0-5.00.7 Cross Slope (PAR)SF13414.8to $120 $16,07415734710ft
feet 2.0-3.016.6 Cross Slope (PAR)SF1318.0to $120 $1,59615734810ft
feet 2.0-3.020.5 Cross Slope (PAR)SF1021.5to $120 $1,14015734910ft
feet 3.0-4.025.3 Cross Slope (PAR)SF3929.4to $120 $4,67415735010ft
feet 2.0-3.029.7 Cross Slope (PAR)SF1531.3to $120 $1,82415735110ft
feet 3.0-4.033.6 Cross Slope (PAR)SF1735.4to $120 $2,05215735210ft
feet .3233.8 Vertical Change REF1034.8to138001 10 ft
feet 2.0-3.036.3 Cross Slope (PAR)SF10547.3to $120 $12,54015735310ft
feet 2.0-3.050.9 Cross Slope (PAR)SF4655.7to $120 $5,47215735410ft
feet 2.0-3.058.5 Cross Slope (PAR)SF19178.6to $120 $22,91415735510ft
feet 4.0-5.080.0 Cross Slope (PAR)SF9189.6to $120 $10,94415735610ft
feet 2.0-3.090.5 Cross Slope (PAR)SF6096.8to $120 $7,18215735710ft
feet 2.0-3.0101.8 Cross Slope (PAR)SF170119.7to $120 $20,40615735810ft
feet 2.0-3.0122.0 Cross Slope (PAR)SF276151.0to $120 $33,06015735910ft
feet 3.0-4.0156.8 Cross Slope (PAR)SF66163.7to $120 $7,86615736010ft
feet 2.0-3.0163.9 Cross Slope (PAR)SF12165.2to $120 $1,48215736110ft
feet 4.0-5.0174.2 Cross Slope (PAR)SF39178.3to $120 $4,67415736210ft
feet 2.0-3.0178.5 Cross Slope (PAR)SF131192.3to $120 $15,73215736310ft
feet 5.0-6.0195.4 Running Slope SF36199.2to $120 $4,33216660310ft
$173,964.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:CITY BOUNDARY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
520
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
EAST SIDE OF LA RIVER
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151239
Run ID
Bandini Blvd
83
ID Sidewalk Width
Priority
feet 4.0-5.00.4 Cross Slope (PAR)SF81.4to $120 $9001551388ft
feet 4.0-5.03.9 Cross Slope (PAR)SF13321.6to $120 $15,9301551398ft
feet -.2610.8 Vertical Change REF811.8to137627 8 ft
feet 5.0-6.025.5 Cross Slope (PAR)SF9838.5to $120 $11,7001551408ft
feet 3.0-4.038.9 Cross Slope (PAR)SF11053.6to $120 $13,2301551418ft
feet .4742.0 Vertical Change REF843.0to137628 8 ft
feet 2.0-3.054.8 Cross Slope (PAR)SF855.9to $120 $9901551428ft
feet 2.0-3.058.0 Cross Slope (PAR)SF3562.6to $120 $4,1401551438ft
feet62.6 Driveway80.5to165802
feet 3.0-4.081.9 Cross Slope (PAR)SF2585.3to $120 $3,0601551448ft
feet 4.0-5.087.8 Cross Slope (PAR)SF126104.6to $120 $15,1201551458ft
feet 2.0-3.0104.8 Cross Slope (PAR)SF9106.0to $120 $1,0801551468ft
feet 3.0-4.0108.5 Cross Slope (PAR)SF8109.6to $120 $9901551478ft
feet 2.0-3.0109.6 Cross Slope (PAR)SF102123.2to $120 $12,2401551488ft
feet 2.0-3.0126.0 Cross Slope (PAR)SF8127.1to $120 $9901551498ft
feet 4.0-5.0130.3 Cross Slope (PAR)SF89142.2to $120 $10,7101551508ft
feet142.2 Driveway169.5to165803
feet 2.0-3.0169.5 Cross Slope (Driveway)SF14171.4to $40 $5701551518ft
feet 5.0-6.0174.8 Cross Slope (PAR)SF27178.4to $120 $3,2401551528ft
feet 3.0-4.0178.8 Cross Slope (PAR)SF41184.3to $120 $4,9501551538ft
feet 2.0-3.0185.1 Cross Slope (PAR)SF32189.3to $120 $3,7801551548ft
feet 3.0-4.0191.4 Cross Slope (PAR)SF145210.7to $120 $17,3701551558ft
feet 2.0-3.0211.5 Cross Slope (PAR)SF56218.9to $120 $6,6601551568ft
feet 4.0-5.0218.9 Cross Slope (PAR)SF46225.0to $120 $5,4901551578ft
feet 2.0-3.0225.3 Cross Slope (PAR)SF13227.0to $120 $1,5301551588ft
feet 3.0-4.0229.3 Cross Slope (PAR)SF11230.7to $120 $1,2601551598ft
feet 2.0-3.0233.9 Cross Slope (PAR)SF23237.0to $120 $2,7901551608ft
feet 2.8234.3 Vertical Change REF8235.3to137629 8 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
521
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
EAST SIDE OF LA RIVER
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151239
Run ID
Bandini Blvd
83
ID Sidewalk Width
Priority
feet 2.0-3.0243.1 Cross Slope (PAR)SF50249.8to $120 $6,0301551618ft
feet 3.0-4.0252.4 Cross Slope (PAR)SF8253.5to $120 $9901551628ft
feet 2.0-3.0253.5 Cross Slope (PAR)SF111268.3to $120 $13,3201551638ft
feet 2.0-3.0276.7 Cross Slope (PAR)SF16278.8to $120 $1,8901551648ft
feet 8.0-9.0287.8 Running Slope SF11289.3to $120 $1,3501665318ft
feet 2.0-3.0292.0 Cross Slope (PAR)SF14293.9to $120 $1,7101551658ft
feet 2.0-3.0313.4 Cross Slope (PAR)SF220342.7to $120 $26,3701551668ft
feet 2.0-3.0359.8 Cross Slope (PAR)SF30363.8to $120 $3,6001551678ft
feet 2.0-3.0367.2 Cross Slope (PAR)SF47373.5to $120 $5,6701551688ft
feet 2.0-3.0377.2 Cross Slope (PAR)SF44383.0to $120 $5,2201551698ft
feet383.0 Driveway409.7to165804
feet 3.0-4.0411.0 Cross Slope (PAR)SF29414.8to $120 $3,4201551708ft
feet 2.0-3.0414.8 Cross Slope (PAR)SF20417.4to $120 $2,3401551718ft
feet 4.0-5.0422.7 Cross Slope (PAR)SF14424.6to $120 $1,7101551728ft
feet 5.0-6.0426.0 Running Slope SF9427.2to $120 $1,0801665328ft
feet427.2 Driveway456.5to165805
feet 2.0-3.0463.3 Cross Slope (PAR)SF26466.8to $120 $3,1501551738ft
feet 3.0-4.0469.8 Cross Slope (PAR)SF116485.2to $120 $13,8601551748ft
feet 5.0-6.0485.4 Cross Slope (PAR)SF14487.3to $120 $1,7101551758ft
feet 3.0-4.0488.8 Cross Slope (PAR)SF8489.9to $120 $9901551768ft
feet 4.0-5.0492.2 Cross Slope (PAR)SF38497.3to $120 $4,5901551778ft
feet .33496.0 Vertical Change REF8497.0to137630 8 ft
feet 2.0-3.0501.3 Cross Slope (PAR)SF16503.4to $120 $1,8901551788ft
feet 3.0-4.0508.0 Cross Slope (PAR)SF23511.1to $120 $2,7901551798ft
feet 2.0-3.0511.1 Cross Slope (PAR)SF40516.4to $120 $4,7701551808ft
feet 3.0-4.0522.3 Cross Slope (PAR)SF30526.3to $120 $3,6001551818ft
feet 2.0-3.0526.5 Cross Slope (PAR)SF35531.2to $120 $4,2301551828ft
feet 2.0-3.0535.3 Cross Slope (PAR)SF108549.7to $120 $12,9601551838ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
522
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
EAST SIDE OF LA RIVER
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151239
Run ID
Bandini Blvd
83
ID Sidewalk Width
Priority
feet 2.0-3.0554.5 Cross Slope (PAR)SF32558.8to $120 $3,8701551848ft
feet 2.0-3.0561.4 Cross Slope (PAR)SF51568.2to $120 $6,1201551858ft
feet 5.0-6.0578.4 Running Slope SF14580.3to $120 $1,7101665338ft
feet580.3 Driveway605.7to165806
feet 2.0-3.0605.7 Cross Slope (Driveway)SF39610.9to $40 $1,5601551868ft
feet 2.0-3.0614.3 Cross Slope (PAR)SF22617.2to $120 $2,6101551878ft
feet618.5 Driveway645.2to165807
feet .31632.5 Vertical Change REF8633.5to137631 8 ft
feet 2.0-3.0645.5 Cross Slope (PAR)SF10646.8to $120 $1,1701551888ft
feet 2.0-3.0661.8 Cross Slope (PAR)SF266697.3to $120 $31,9501551898ft
feet .6675.0 Vertical Change REF8676.0to137632 8 ft
feet 2.0-3.0699.4 Cross Slope (PAR)SF66708.2to $120 $7,9201551908ft
feet 2.0-3.0714.2 Cross Slope (PAR)SF8715.3to $120 $9901551918ft
feet 4.0-5.0716.6 Cross Slope (PAR)SF29720.5to $120 $3,5101551928ft
feet 2.0-3.0720.5 Cross Slope (PAR)SF31724.6to $120 $3,6901551938ft
feet728.6 Driveway753.7to165808
feet 6.0-7.0753.8 Cross Slope (Driveway)SF8754.9to $40 $3301551948ft
feet 5.0-6.0755.1 Cross Slope (PAR)SF32759.3to $120 $3,7801551958ft
feet 6.0-7.0760.5 Cross Slope (PAR)SF17762.8to $120 $2,0701551968ft
feet 5.0-6.0765.0 Cross Slope (PAR)SF83776.1to $120 $9,9901551978ft
feet 3.0-4.0777.8 Cross Slope (PAR)SF14779.7to $120 $1,7101551988ft
feet .39790.1 Vertical Change LF8791.1to $75 $5631376338ft
feet 3.0-4.0792.7 Cross Slope (PAR)SF77802.9to $120 $9,1801551998ft
feet 5.0-6.0801.6 Running Slope REF11803.0to166534 8 ft
feet803.7 Driveway847.6to165809
feet803.7 Driveway983.2to165810
feet -.39817.1 Vertical Change REF8818.1to137634 8 ft
feet 5.0-6.0847.6 Cross Slope (Driveway)SF11849.0to $40 $4201552008ft
feet 3.0-4.0849.9 Cross Slope (Driveway)SF95862.6to $40 $3,8101552018ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
523
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
EAST SIDE OF LA RIVER
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151239
Run ID
Bandini Blvd
83
ID Sidewalk Width
Priority
feet 2.0-3.0862.6 Cross Slope (Driveway)SF73872.3to $40 $2,9101552028ft
feet 4.0-5.0872.3 Cross Slope (Driveway)SF184896.8to $40 $7,3501552038ft
feet 5.0-6.0900.3 Cross Slope (Driveway)SF11901.8to $40 $4501552048ft
feet 5.0-6.0905.3 Cross Slope (Driveway)SF23908.3to $40 $9001552058ft
feet 3.0-4.0908.3 Cross Slope (Driveway)SF35912.9to $40 $1,3801552068ft
feet 3.0-4.0919.2 Cross Slope (Driveway)SF46925.3to $40 $1,8301552078ft
feet 6.0-7.0928.0 Cross Slope (Driveway)SF9929.2to $40 $3601552088ft
feet 5.0-6.0929.6 Cross Slope (Driveway)SF11931.1to $40 $4501552098ft
feet 5.0-6.0932.9 Running Slope REF22935.8to166535 8 ft
feet 4.0-5.0934.6 Cross Slope (Driveway)SF65943.3to $40 $2,6101552108ft
feet938.4 Continuous Width REF8939.4to167342 8 ft
feet 2.0-3.0949.0 Cross Slope (Driveway)SF24952.2to $40 $9601552118ft
feet 2.0-3.0959.3 Cross Slope (Driveway)SF21962.1to $40 $8401552128ft
feet 2.0-3.0966.8 Cross Slope (Driveway)SF10968.1to $40 $3901552138ft
feet 2.0-3.0971.5 Cross Slope (Driveway)SF61979.6to $40 $2,4301552148ft
feet 5.0-6.0980.4 Running Slope REF21983.2to166536 8 ft
$387,772.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:EAST SIDE OF LA RIVER
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
524
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
FWY 710 RAMP
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
2001161108
Run ID
Bandini Blvd
77
ID Sidewalk Width
Priority
feet 3.0-4.00.3 Cross Slope (PAR)SF394.4to $120 $4,67415751510ft
feet 3.0-4.06.8 Cross Slope (PAR)SF118.0to $120 $1,36815751610ft
feet 2.0-3.010.1 Cross Slope (PAR)SF1111.3to $120 $1,36815751710ft
feet 2.0-3.013.7 Cross Slope (PAR)SF8522.6to $120 $10,14615751810ft
feet 2.0-3.025.3 Cross Slope (PAR)SF1126.5to $120 $1,36815751910ft
feet 2.0-3.030.1 Cross Slope (PAR)SF3033.3to $120 $3,64815752010ft
feet 4.0-5.034.3 Cross Slope (PAR)SF1435.8to $120 $1,71015752110ft
feet 2.0-3.039.2 Cross Slope (PAR)SF2341.6to $120 $2,73615752210ft
feet 4.0-5.041.6 Cross Slope (PAR)SF4045.8to $120 $4,78815752310ft
feet 2.0-3.045.8 Cross Slope (PAR)SF4250.2to $120 $5,01615752410ft
feet 2.0-3.053.7 Cross Slope (PAR)SF10364.5to $120 $12,31215752510ft
feet 3.0-4.066.9 Cross Slope (PAR)SF4371.4to $120 $5,13015752610ft
feet 2.0-3.071.6 Cross Slope (PAR)SF11283.4to $120 $13,45215752710ft
feet 2.0-3.085.9 Cross Slope (PAR)SF1687.6to $120 $1,93815752810ft
feet 2.0-3.090.9 Cross Slope (PAR)SF5296.4to $120 $6,27015752910ft
feet 3.0-4.099.1 Cross Slope (PAR)SF29102.2to $120 $3,53415753010ft
feet 2.0-3.0103.3 Cross Slope (PAR)SF71110.8to $120 $8,55015753110ft
feet 4.0-5.0111.8 Cross Slope (PAR)SF62118.3to $120 $7,41015753210ft
feet .36113.1 Vertical Change REF10114.1to138028 10 ft
feet 2.0-3.0119.6 Cross Slope (PAR)SF11120.8to $120 $1,36815753310ft
feet 3.0-4.0125.4 Cross Slope (PAR)SF140140.1to $120 $16,75815753410ft
feet .61129.8 Vertical Change REF10130.8to138029 10 ft
feet 2.0-3.0141.3 Cross Slope (PAR)SF26144.0to $120 $3,07815753510ft
feet 4.0-5.0146.5 Cross Slope (PAR)SF41150.8to $120 $4,90215753610ft
feet 2.0-3.0151.6 Cross Slope (PAR)SF27154.4to $120 $3,19215753710ft
feet 2.0-3.0174.8 Cross Slope (PAR)SF76182.8to $120 $9,12015753810ft
feet 3.0-4.0186.2 Cross Slope (PAR)SF20188.3to $120 $2,39415753910ft
feet 2.0-3.0193.4 Cross Slope (PAR)SF99203.8to $120 $11,85615754010ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
525
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
FWY 710 RAMP
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
2001161108
Run ID
Bandini Blvd
77
ID Sidewalk Width
Priority
feet 4.0-5.0204.7 Cross Slope (PAR)SF223228.2to $120 $26,79015754110ft
feet -.43224.8 Vertical Change REF10225.8to138030 10 ft
feet 3.0-4.0231.3 Cross Slope (PAR)SF52236.8to $120 $6,27015754210ft
feet 2.0-3.0238.1 Cross Slope (PAR)SF109249.6to $120 $13,11015754310ft
feet 2.0-3.0251.9 Cross Slope (PAR)SF28254.8to $120 $3,30615754410ft
feet 4.0-5.0254.9 Cross Slope (PAR)SF13256.3to $120 $1,59615754510ft
feet 3.0-4.0267.3 Cross Slope (PAR)SF115279.4to $120 $13,79415754610ft
feet276.1 Continuous Width REF10277.1to167034 10 ft
feet 2.0-3.0280.5 Cross Slope (PAR)SF122293.3to $120 $14,59215754710ft
feet 4.0-5.0293.3 Cross Slope (PAR)SF10294.3to $120 $1,14015754810ft
feet 2.0-3.0298.8 Cross Slope (PAR)SF17300.6to $120 $2,05215754910ft
feet 2.0-3.0303.4 Cross Slope (PAR)SF44308.0to $120 $5,24415755010ft
feet 2.0-3.0314.3 Cross Slope (PAR)SF49319.5to $120 $5,92815755110ft
feet 2.0-3.0321.6 Cross Slope (PAR)SF48326.7to $120 $5,81415755210ft
feet 2.0-3.0347.8 Cross Slope (PAR)SF57353.8to $120 $6,84015755310ft
feet 2.0-3.0357.7 Cross Slope (PAR)SF74365.5to $120 $8,89215755410ft
feet 2.0-3.0375.8 Cross Slope (PAR)SF12377.1to $120 $1,48215755510ft
feet 2.0-3.0410.0 Cross Slope (PAR)SF11411.2to $120 $1,36815755610ft
feet .57434.0 Vertical Change SF10435.0to $75 $71313803110ft
feet 2.0-3.0436.6 Cross Slope (PAR)SF26439.3to $120 $3,07815755710ft
feet 2.0-3.0443.8 Cross Slope (PAR)SF20445.9to $120 $2,39415755810ft
feet 3.44455.9 Vertical Change SF10456.9to $75 $71313803210ft
feet 2.0-3.0479.5 Cross Slope (PAR)SF114491.5to $120 $13,68015755910ft
feet 4.0-5.0491.5 Cross Slope (PAR)SF55497.3to $120 $6,61215756010ft
feet 2.0-3.0498.3 Cross Slope (PAR)SF14499.8to $120 $1,71015756110ft
feet499.8 Cold Patch 52505.3to140247 10 ft
feet 2.0-3.0505.9 Cross Slope (PAR)SF12507.2to $120 $1,48215756210ft
feet 2.0-3.0510.3 Cross Slope (PAR)SF10511.3to $120 $1,14015756310ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
526
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
FWY 710 RAMP
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
2001161108
Run ID
Bandini Blvd
77
ID Sidewalk Width
Priority
feet 2.0-3.0517.6 Cross Slope (PAR)SF47522.5to $120 $5,58615756410ft
$303,411.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:FWY 710 RAMP
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
527
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
PENNINGTON WY
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
2001161204
Run ID
Bandini Blvd
81
ID Sidewalk Width
Priority
feet 2.0-3.02.2 Cross Slope (PAR)SF6811.3to $120 $8,1901571488ft
feet 3.0-4.014.2 Cross Slope (PAR)SF1215.8to $120 $1,4401571498ft
feet 3.0-4.019.8 Cross Slope (PAR)SF1321.5to $120 $1,5301571508ft
feet 3.0-4.026.3 Cross Slope (PAR)SF1027.6to $120 $1,1701571518ft
feet 2.0-3.028.6 Cross Slope (PAR)SF3833.6to $120 $4,5001571528ft
feet 2.0-3.035.8 Cross Slope (PAR)SF3640.6to $120 $4,3201571538ft
feet41.3 Cold Patch 1543.3to140550 8 ft
feet 2.0-3.043.3 Cross Slope (PAR)SF1445.1to $120 $1,6201571548ft
feet 2.0-3.053.0 Cross Slope (PAR)SF1855.4to $120 $2,1601571558ft
feet 2.0-3.062.9 Cross Slope (PAR)SF6771.8to $120 $8,0101571568ft
feet 4.0-5.071.8 Cross Slope (PAR)SF2675.3to $120 $3,1501571578ft
feet 2.0-3.075.5 Cross Slope (PAR)SF11590.8to $120 $13,7701571588ft
feet 2.0-3.093.7 Cross Slope (PAR)SF113108.8to $120 $13,5901571598ft
feet 2.0-3.0116.3 Cross Slope (PAR)SF58124.0to $120 $6,9301571608ft
feet 2.0-3.0126.8 Cross Slope (PAR)SF73136.5to $120 $8,7301571618ft
feet 2.0-3.0138.9 Cross Slope (PAR)SF56146.3to $120 $6,6601571628ft
feet 2.0-3.0150.4 Cross Slope (PAR)SF140169.0to $120 $16,7401571638ft
feet 2.0-3.0172.5 Cross Slope (PAR)SF26175.9to $120 $3,0601571648ft
feet 3.0-4.0178.8 Cross Slope (PAR)SF15180.8to $120 $1,8001571658ft
feet 2.0-3.0180.8 Cross Slope (PAR)SF161202.3to $120 $19,3501571668ft
feet203.7 Cold Patch 27207.3to140551 8 ft
feet 2.0-3.0207.3 Cross Slope (PAR)SF50213.9to $120 $5,9401571678ft
feet 3.0-4.0216.6 Cross Slope (PAR)SF20219.3to $120 $2,4301571688ft
feet 2.0-3.0221.0 Cross Slope (PAR)SF59228.9to $120 $7,1101571698ft
feet 3.0-4.0232.4 Cross Slope (PAR)SF38237.4to $120 $4,5001571708ft
feet 2.0-3.0237.4 Cross Slope (PAR)SF44243.3to $120 $5,3101571718ft
feet 2.0-3.0247.8 Cross Slope (PAR)SF191273.3to $120 $22,9501571728ft
feet 4.0-5.0274.3 Cross Slope (PAR)SF31278.4to $120 $3,6901571738ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
528
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
PENNINGTON WY
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
2001161204
Run ID
Bandini Blvd
81
ID Sidewalk Width
Priority
feet 2.0-3.0282.7 Cross Slope (PAR)SF46288.8to $120 $5,4901571748ft
feet .31283.2 Vertical Change REF8284.2to137968 8 ft
feet 2.0-3.0305.8 Cross Slope (PAR)SF37310.7to $120 $4,4101571758ft
feet 2.0-3.0321.8 Cross Slope (PAR)SF30325.8to $120 $3,6001571768ft
feet .26326.3 Vertical Change LF8327.3to $75 $5631379698ft
feet 2.0-3.0329.2 Cross Slope (PAR)SF65337.8to $120 $7,7401571778ft
feet 2.0-3.0341.8 Cross Slope (PAR)SF113356.8to $120 $13,5001571788ft
feet 2.0-3.0358.9 Cross Slope (PAR)SF26362.3to $120 $3,0601571798ft
feet 2.0-3.0373.8 Cross Slope (PAR)SF29377.6to $120 $3,4201571808ft
feet 2.0-3.0385.0 Cross Slope (PAR)SF12386.6to $120 $1,4401571818ft
feet 2.0-3.0389.0 Cross Slope (PAR)SF32393.2to $120 $3,7801571828ft
feet 2.0-3.0407.3 Cross Slope (PAR)SF94419.8to $120 $11,2501571838ft
feet 3.0-4.0424.9 Cross Slope (PAR)SF35429.5to $120 $4,1401571848ft
feet 2.0-3.0430.8 Cross Slope (PAR)SF87442.4to $120 $10,4401571858ft
feet 2.0-3.0453.3 Cross Slope (PAR)SF41458.8to $120 $4,9501571868ft
feet455.4 Protruding Object JOB8456.4to $99 $991673108ft
feet 2.0-3.0462.2 Cross Slope (PAR)SF41467.6to $120 $4,8601571878ft
feet 2.0-3.0471.2 Cross Slope (PAR)SF89483.0to $120 $10,6201571888ft
feet 2.0-3.0485.7 Cross Slope (PAR)SF9486.9to $120 $1,0801571898ft
feet 2.0-3.0491.5 Cross Slope (PAR)SF45497.5to $120 $5,4001571908ft
feet .37493.0 Vertical Change REF8494.0to137970 8 ft
feet 2.0-3.0501.3 Cross Slope (PAR)SF67510.2to $120 $8,0101571918ft
feet 2.0-3.0516.6 Cross Slope (PAR)SF129533.8to $120 $15,4801571928ft
feet -.34521.4 Vertical Change REF8522.4to137971 8 ft
feet 2.0-3.0537.1 Cross Slope (PAR)SF11538.5to $120 $1,2601571938ft
feet 2.0-3.0540.6 Cross Slope (PAR)SF149560.4to $120 $17,8201571948ft
feet 5.0-6.0563.3 Cross Slope (PAR)SF23566.3to $120 $2,7001571958ft
feet 6.0-7.0566.3 Cross Slope (PAR)SF29570.2to $120 $3,5101571968ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
529
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
PENNINGTON WY
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
2001161204
Run ID
Bandini Blvd
81
ID Sidewalk Width
Priority
feet 5.0-6.0570.2 Cross Slope (PAR)SF92582.5to $120 $11,0701571978ft
feet 6.0-7.0582.7 Cross Slope (PAR)SF54589.9to $120 $6,4801571988ft
feet 6.0-7.0592.1 Cross Slope (PAR)SF91604.3to $120 $10,9801571998ft
feet 5.0-6.0606.0 Cross Slope (PAR)SF83617.1to $120 $9,9901572008ft
feet 3.0-4.0617.3 Cross Slope (PAR)SF27620.9to $120 $3,2401572018ft
feet 5.0-6.0620.9 Cross Slope (PAR)SF25624.3to $120 $3,0601572028ft
feet 6.0-7.0625.8 Cross Slope (PAR)SF11627.3to $120 $1,3501572038ft
feet 5.0-6.0627.4 Cross Slope (PAR)SF13629.1to $120 $1,5301572048ft
feet 3.0-4.0629.8 Cross Slope (PAR)SF9631.0to $120 $1,0801572058ft
feet 2.0-3.0631.5 Cross Slope (PAR)SF12633.1to $120 $1,4401572068ft
$377,491.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:PENNINGTON WY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
530
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
PENNINGTON WY
Survey Street Name Starting Street Name
5276 BANDINI BLVD
End Street Name
2001161124
Run ID
Bandini Blvd
69
ID Sidewalk Width
Priority
feet1.0 Continuous Width REF102.0to167005 10 ft
feet 3.0-4.01.2 Cross Slope (PAR)SF102.2to $120 $1,14015736410ft
feet .294.4 Vertical Change REF95.4to138002 10 ft
feet 6.0-7.05.4 Cross Slope (PAR)SF13219.3to $120 $15,84615736510ft
feet 3.298.4 Vertical Change REF109.4to138003 10 ft
feet 5.0-6.019.3 Cross Slope (PAR)SF7327.0to $120 $8,77815736610ft
feet 6.0-7.027.2 Cross Slope (PAR)SF2529.8to $120 $2,96415736710ft
feet 5.0-6.030.5 Cross Slope (PAR)SF6337.1to $120 $7,52415736810ft
feet 5.0-6.039.2 Cross Slope (PAR)SF1040.3to $120 $1,25415736910ft
feet 4.0-5.045.4 Cross Slope (PAR)SF2948.5to $120 $3,53415737010ft
feet 7.0-8.050.1 Cross Slope (PAR)SF3954.2to $120 $4,67415737110ft
feet 5.0-6.054.4 Cross Slope (PAR)SF1055.5to $120 $1,25415737210ft
feet 6.0-7.056.0 Cross Slope (PAR)SF8665.1to $120 $10,37415737310ft
feet 6.0-7.067.2 Cross Slope (PAR)SF3470.8to $120 $4,10415737410ft
feet 5.0-6.071.3 Cross Slope (PAR)SF1172.5to $120 $1,36815737510ft
feet 6.0-7.072.8 Cross Slope (PAR)SF1474.3to $120 $1,71015737610ft
feet 5.0-6.076.8 Cross Slope (PAR)SF10587.8to $120 $12,54015737710ft
feet 6.0-7.087.9 Cross Slope (PAR)SF134102.0to $120 $16,07415737810ft
feet 5.0-6.0102.3 Cross Slope (PAR)SF68109.5to $120 $8,20815737910ft
feet 4.0-5.0113.0 Cross Slope (PAR)SF226136.8to $120 $27,13215738010ft
feet 4.0-5.0141.5 Cross Slope (PAR)SF26144.2to $120 $3,07815738110ft
feet 6.0-7.0145.7 Cross Slope (PAR)SF23148.1to $120 $2,73615738210ft
feet 5.0-6.0148.4 Cross Slope (PAR)SF35152.1to $120 $4,21815738310ft
feet 5.0-6.0154.2 Cross Slope (PAR)SF11155.4to $120 $1,36815738410ft
feet 3.0-4.0156.8 Cross Slope (PAR)SF35160.5to $120 $4,21815738510ft
feet 6.0-7.0162.1 Cross Slope (PAR)SF26164.8to $120 $3,07815738610ft
feet 5.0-6.0164.8 Cross Slope (PAR)SF24167.3to $120 $2,85015738710ft
feet 3.0-4.0167.3 Cross Slope (PAR)SF24169.8to $120 $2,85015738810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
531
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
PENNINGTON WY
Survey Street Name Starting Street Name
5276 BANDINI BLVD
End Street Name
2001161124
Run ID
Bandini Blvd
69
ID Sidewalk Width
Priority
feet 3.0-4.0172.8 Cross Slope (PAR)SF87182.0to $120 $10,48815738910ft
feet 6.0-7.0184.3 Cross Slope (PAR)SF23186.7to $120 $2,73615739010ft
feet 3.0-4.0189.6 Cross Slope (PAR)SF39193.7to $120 $4,67415739110ft
feet 5.0-6.0193.7 Cross Slope (PAR)SF104204.6to $120 $12,42615739210ft
feet 5.0-6.0207.1 Cross Slope (PAR)SF12208.4to $120 $1,48215739310ft
feet 5.0-6.0210.6 Cross Slope (PAR)SF119223.1to $120 $14,25015739410ft
feet 6.0-7.0223.5 Cross Slope (PAR)SF47228.4to $120 $5,58615739510ft
feet 5.0-6.0228.4 Cross Slope (PAR)SF15230.0to $120 $1,82415739610ft
feet 4.0-5.0234.8 Cross Slope (PAR)SF21237.0to $120 $2,50815739710ft
feet 5.0-6.0239.8 Cross Slope (PAR)SF14241.3to $120 $1,71015739810ft
feet 6.0-7.0242.8 Cross Slope (PAR)SF11244.0to $120 $1,36815739910ft
feet 6.0-7.0246.2 Cross Slope (PAR)SF64252.9to $120 $7,63815740010ft
feet 5.0-6.0252.9 Cross Slope (PAR)SF30256.1to $120 $3,64815740110ft
feet 6.0-7.0256.8 Cross Slope (PAR)SF33260.3to $120 $3,99015740210ft
feet 5.0-6.0261.9 Cross Slope (PAR)SF89271.3to $120 $10,71615740310ft
feet 6.0-7.0271.5 Cross Slope (PAR)SF29274.6to $120 $3,53415740410ft
feet 6.0-7.0277.7 Cross Slope (PAR)SF82286.3to $120 $9,80415740510ft
feet 5.0-6.0286.3 Cross Slope (PAR)SF126299.6to $120 $15,16215740610ft
feet .39299.4 Vertical Change REF10300.4to138004 10 ft
feet 6.0-7.0299.9 Cross Slope (PAR)SF24302.4to $120 $2,85015740710ft
feet .3304.5 Vertical Change REF10305.5to138005 10 ft
feet 5.0-6.0305.3 Cross Slope (PAR)SF46310.1to $120 $5,47215740810ft
feet 4.0-5.0314.0 Cross Slope (PAR)SF27316.8to $120 $3,19215740910ft
feet 6.0-7.0318.0 Cross Slope (PAR)SF26320.7to $120 $3,07815741010ft
feet 5.0-6.0320.8 Cross Slope (PAR)SF95330.8to $120 $11,40015741110ft
feet 6.0-7.0330.8 Cross Slope (PAR)SF110342.4to $120 $13,22415741210ft
$305,634.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:PENNINGTON WY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
532
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001161250
Run ID
Bandini Blvd
88.5
ID Sidewalk Width
Priority
feet 3.0-4.07.2 Cross Slope (PAR)SF139.8to $120 $1,5601568395ft
feet 2.0-3.011.5 Cross Slope (PAR)SF1414.3to $120 $1,6801568405ft
feet 2.0-3.018.1 Cross Slope (PAR)SF3825.7to $120 $4,5601568415ft
feet 3.0-4.031.4 Cross Slope (PAR)SF832.9to $120 $9001568425ft
feet .3135.6 Vertical Change REF536.6to137935 5 ft
feet 2.0-3.035.8 Cross Slope (PAR)SF1137.9to $120 $1,2601568435ft
feet 2.0-3.040.8 Cross Slope (PAR)SF4349.4to $120 $5,1601568445ft
feet 2.0-3.053.9 Cross Slope (PAR)SF1456.7to $120 $1,6801568455ft
feet 2.0-3.062.5 Cross Slope (PAR)SF2868.1to $120 $3,3601568465ft
feet 4.0-5.070.3 Cross Slope (PAR)SF2575.3to $120 $3,0001568475ft
feet .2680.7 Vertical Change LF581.7to $75 $3751379365ft
feet 3.0-4.084.0 Cross Slope (PAR)SF785.3to $120 $7801568485ft
feet 2.0-3.086.3 Cross Slope (PAR)SF2691.4to $120 $3,0601568495ft
feet .2891.6 Vertical Change LF592.6to $75 $3751379375ft
feet 3.5194.9 Vertical Change SF595.9to $75 $3751379385ft
feet 2.0-3.0124.1 Cross Slope (PAR)SF6125.3to $120 $7201568505ft
feet 2.0-3.0129.7 Cross Slope (PAR)SF26134.8to $120 $3,0601568515ft
feet 4.0-5.0134.8 Cross Slope (PAR)SF25139.8to $120 $3,0001568525ft
feet 3.0-4.0143.0 Cross Slope (PAR)SF8144.7to $120 $1,0201568535ft
feet .27145.7 Vertical Change LF5146.7to $75 $3751379395ft
feet 3.0-4.0149.5 Cross Slope (PAR)SF20153.5to $120 $2,4001568545ft
feet 2.0-3.0156.7 Cross Slope (PAR)SF6157.9to $120 $7201568555ft
feet 2.0-3.0163.7 Cross Slope (PAR)SF6164.8to $120 $6601568565ft
feet 2.0-3.0169.4 Cross Slope (PAR)SF7170.8to $120 $8401568575ft
feet 2.0-3.0178.8 Cross Slope (PAR)SF5179.8to $120 $6001568585ft
feet 2.0-3.0185.8 Cross Slope (PAR)SF13188.3to $120 $1,5001568595ft
feet 2.0-3.0243.8 Cross Slope (PAR)SF68257.4to $120 $8,1601568605ft
feet 5.0-6.0258.9 Cross Slope (PAR)SF10260.8to $120 $1,1401568615ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
533
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001161250
Run ID
Bandini Blvd
88.5
ID Sidewalk Width
Priority
feet 3.0-4.0264.0 Cross Slope (PAR)SF17267.3to $120 $1,9801568625ft
feet 2.0-3.0268.0 Cross Slope (PAR)SF83284.6to $120 $9,9601568635ft
feet288.8 Continuous Width SF5289.8to $120 $6001671215ft
feet 4.0-5.0289.4 Cross Slope (PAR)SF7290.7to $120 $7801568645ft
feet 2.0-3.0292.5 Cross Slope (PAR)SF16295.7to $120 $1,9201568655ft
feet 2.0-3.0309.8 Cross Slope (PAR)SF25314.8to $120 $3,0001568665ft
feet 2.0-3.0359.5 Cross Slope (PAR)SF14362.3to $120 $1,6801568675ft
feet 2.0-3.0387.0 Cross Slope (PAR)SF6388.1to $120 $6601568685ft
feet 2.0-3.0393.4 Cross Slope (PAR)SF26398.5to $120 $3,0601568695ft
feet 4.0-5.0398.7 Cross Slope (PAR)SF9400.5to $120 $1,0801568705ft
feet 3.0-4.0402.6 Cross Slope (PAR)SF28408.2to $120 $3,3601568715ft
feet 2.0-3.0408.9 Cross Slope (PAR)SF36416.0to $120 $4,2601568725ft
feet 2.0-3.0432.5 Cross Slope (PAR)SF26437.7to $120 $3,1201568735ft
feet 3.0-4.0440.8 Cross Slope (PAR)SF7442.1to $120 $7801568745ft
feet 2.0-3.0443.3 Cross Slope (PAR)SF78458.9to $120 $9,3601568755ft
feet 2.0-3.0462.4 Cross Slope (PAR)SF22466.8to $120 $2,6401568765ft
feet 3.0-4.0469.3 Cross Slope (PAR)SF38476.8to $120 $4,5001568775ft
feet 2.0-3.0477.9 Cross Slope (PAR)SF10479.9to $120 $1,2001568785ft
feet 3.0-4.0483.4 Cross Slope (PAR)SF7484.7to $120 $7801568795ft
feet 5.0-6.0486.1 Cross Slope (PAR)SF16489.3to $120 $1,9201568805ft
feet 3.0-4.0489.3 Cross Slope (PAR)SF19493.1to $120 $2,2801568815ft
feet 2.0-3.0493.8 Cross Slope (PAR)SF18497.3to $120 $2,1001568825ft
feet 4.0-5.0500.4 Cross Slope (PAR)SF47509.7to $120 $5,5801568835ft
feet 4.0-5.0514.3 Cross Slope (PAR)SF27519.7to $120 $3,2401568845ft
feet 2.0-3.0519.7 Cross Slope (PAR)SF13522.2to $120 $1,5001568855ft
feet 2.0-3.0524.3 Cross Slope (PAR)SF52534.7to $120 $6,2401568865ft
feet 3.0-4.0538.7 Cross Slope (PAR)SF9540.6to $120 $1,1401568875ft
feet 3.0-4.0543.1 Cross Slope (PAR)SF8544.7to $120 $9601568885ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
534
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001161250
Run ID
Bandini Blvd
88.5
ID Sidewalk Width
Priority
feet 2.0-3.0545.9 Cross Slope (PAR)SF22550.3to $120 $2,6401568895ft
feet 2.0-3.0556.2 Cross Slope (PAR)SF69570.1to $120 $8,3401568905ft
feet576.4 Driveway617.7to165904
feet .43590.6 Vertical Change REF5591.6to137940 5 ft
feet .38608.5 Vertical Change REF5609.5to137941 5 ft
feet -.38617.0 Vertical Change REF5618.0to137942 5 ft
feet 4.0-5.0618.5 Cross Slope (Driveway)SF5619.5to $40 $2001568915ft
feet 2.0-3.0620.3 Cross Slope (PAR)SF97639.6to $120 $11,5801568925ft
feet 2.0-3.0644.3 Cross Slope (PAR)SF10646.2to $120 $1,1401568935ft
feet 2.0-3.0648.4 Cross Slope (PAR)SF24653.3to $120 $2,9401568945ft
feet 2.0-3.0658.0 Cross Slope (PAR)SF7659.4to $120 $8401568955ft
feet 3.0-4.0661.9 Cross Slope (PAR)SF21666.0to $120 $2,4601568965ft
feet 2.0-3.0666.0 Cross Slope (PAR)SF50675.9to $120 $5,9401568975ft
feet 2.0-3.0678.4 Cross Slope (PAR)SF12680.7to $120 $1,3801568985ft
feet 2.0-3.0684.4 Cross Slope (PAR)SF12686.8to $120 $1,4401568995ft
feet 2.0-3.0691.0 Cross Slope (PAR)SF8692.6to $120 $9601569005ft
feet707.5 Driveway758.9to165905
feet .36732.8 Vertical Change REF5733.8to137943 5 ft
feet 3.0-4.0772.7 Cross Slope (PAR)SF6773.9to $120 $7201569015ft
feet 2.0-3.0774.3 Cross Slope (PAR)SF8775.8to $120 $9001569025ft
feet 2.0-3.0779.7 Cross Slope (PAR)SF16782.8to $120 $1,8601569035ft
feet 2.0-3.0787.6 Cross Slope (PAR)SF10789.5to $120 $1,1401569045ft
feet 2.0-3.0791.8 Cross Slope (PAR)SF33798.4to $120 $3,9601569055ft
feet 2.0-3.0801.3 Cross Slope (PAR)SF8802.8to $120 $9001569065ft
feet 2.0-3.0811.5 Cross Slope (PAR)SF18815.1to $120 $2,1601569075ft
feet 3.0-4.0817.2 Cross Slope (PAR)SF20821.2to $120 $2,4001569085ft
feet 2.0-3.0825.1 Cross Slope (PAR)SF21829.3to $120 $2,5201569095ft
feet 2.0-3.0836.2 Cross Slope (PAR)SF6837.3to $120 $6601569105ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
535
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001161250
Run ID
Bandini Blvd
88.5
ID Sidewalk Width
Priority
feet 3.0-4.0839.4 Cross Slope (PAR)SF7840.7to $120 $7801569115ft
feet 2.0-3.0840.7 Cross Slope (PAR)SF9842.5to $120 $1,0801569125ft
feet 2.0-3.0846.7 Cross Slope (PAR)SF5847.7to $120 $6001569135ft
feet 2.0-3.0900.1 Cross Slope (PAR)SF16903.3to $120 $1,9201569145ft
feet 2.0-3.0905.8 Cross Slope (PAR)SF19909.5to $120 $2,2201569155ft
feet 2.0-3.0914.8 Cross Slope (PAR)SF83931.4to $120 $9,9601569165ft
feet 2.0-3.0934.0 Cross Slope (PAR)SF35941.0to $120 $4,2001569175ft
feet948.3 Driveway966.9to165906
feet -.43948.5 Vertical Change REF5949.5to137944 5 ft
feet 3.0-4.0975.8 Cross Slope (PAR)SF9977.6to $120 $1,0801569185ft
feet 2.0-3.0978.1 Cross Slope (PAR)SF9979.8to $120 $1,0201569195ft
feet 2.0-3.0982.8 Cross Slope (PAR)SF24987.5to $120 $2,8201569205ft
feet 4.0-5.0988.8 Cross Slope (PAR)SF1461017.9to $120 $17,4601569215ft
$232,220.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:S ATLANTIC BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
536
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
PENNINGTON WY
End Street Name
2001161118
Run ID
Bandini Blvd
118.25
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF485.0to $120 $5,70015741310ft
feet 3.0-4.010.3 Cross Slope (PAR)SF7718.4to $120 $9,23415741410ft
feet 3.0-4.021.8 Cross Slope (PAR)SF2924.8to $120 $3,42015741510ft
feet 4.0-5.026.9 Cross Slope (PAR)SF8335.6to $120 $9,91815741610ft
feet 3.0-4.038.5 Cross Slope (PAR)SF3041.7to $120 $3,64815741710ft
feet 2.0-3.043.0 Cross Slope (PAR)SF1244.3to $120 $1,48215741810ft
feet 8.0-9.047.5 Cross Slope (PAR)SF3150.8to $120 $3,76215741910ft
feet 6.0-7.051.2 Cross Slope (PAR)SF1452.7to $120 $1,71015742010ft
feet 5.0-6.053.3 Cross Slope (PAR)SF10364.1to $120 $12,31215742110ft
feet 3.0-4.064.8 Cross Slope (PAR)SF5570.6to $120 $6,61215742210ft
feet 5.0-6.070.6 Cross Slope (PAR)SF5075.9to $120 $6,04215742310ft
feet 5.0-6.079.4 Cross Slope (PAR)SF7587.3to $120 $9,00615742410ft
feet 6.0-7.087.4 Cross Slope (PAR)SF4391.9to $120 $5,13015742510ft
feet 5.0-6.092.3 Cross Slope (PAR)SF1293.6to $120 $1,48215742610ft
feet 6.0-7.093.6 Cross Slope (PAR)SF3597.3to $120 $4,21815742710ft
feet 5.0-6.098.3 Cross Slope (PAR)SF164115.6to $120 $19,72215742810ft
feet 5.0-6.0118.1 Cross Slope (PAR)SF219141.2to $120 $26,33415742910ft
feet 6.0-7.0141.6 Cross Slope (PAR)SF66148.5to $120 $7,86615743010ft
feet 6.0-7.0152.9 Cross Slope (PAR)SF13154.3to $120 $1,59615743110ft
feet 5.0-6.0155.8 Cross Slope (PAR)SF17157.6to $120 $2,05215743210ft
feet 6.0-7.0161.3 Cross Slope (PAR)SF17163.1to $120 $2,05215743310ft
feet 6.0-7.0167.2 Cross Slope (PAR)SF30170.4to $120 $3,64815743410ft
feet 6.0-7.0175.4 Cross Slope (PAR)SF14176.9to $120 $1,71015743510ft
feet 5.0-6.0176.9 Cross Slope (PAR)SF42181.3to $120 $5,01615743610ft
feet 6.0-7.0181.6 Cross Slope (PAR)SF20183.7to $120 $2,39415743710ft
feet 5.0-6.0183.9 Cross Slope (PAR)SF66190.8to $120 $7,86615743810ft
feet 6.0-7.0192.0 Cross Slope (PAR)SF16193.7to $120 $1,93815743910ft
feet 5.0-6.0193.7 Cross Slope (PAR)SF46198.5to $120 $5,47215744010ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
537
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
PENNINGTON WY
End Street Name
2001161118
Run ID
Bandini Blvd
118.25
ID Sidewalk Width
Priority
feet .78196.8 Vertical Change REF10197.8to138006 10 ft
feet 6.0-7.0198.5 Cross Slope (PAR)SF37202.4to $120 $4,44615744110ft
feet -.33201.8 Vertical Change REF10202.8to138007 10 ft
feet 5.0-6.0202.4 Cross Slope (PAR)SF37206.3to $120 $4,44615744210ft
feet .58206.7 Vertical Change REF10207.7to138008 10 ft
feet 6.0-7.0207.3 Cross Slope (PAR)SF26210.0to $120 $3,07815744310ft
feet 4.0-5.0211.3 Cross Slope (PAR)SF12212.6to $120 $1,48215744410ft
feet 4.0-5.0215.2 Cross Slope (PAR)SF10216.3to $120 $1,25415744510ft
feet 4.0-5.0218.9 Cross Slope (PAR)SF52224.4to $120 $6,27015744610ft
feet 2.0-3.0226.3 Cross Slope (PAR)SF136240.6to $120 $16,30215744710ft
feet235.3 Continuous Width REF10236.3to166981 10 ft
feet 5.0-6.0244.8 Cross Slope (PAR)SF17246.6to $120 $2,05215744810ft
feet 5.0-6.0255.9 Cross Slope (PAR)SF42260.3to $120 $5,01615744910ft
feet 5.0-6.0262.7 Cross Slope (PAR)SF81271.2to $120 $9,69015745010ft
feet .31264.7 Vertical Change REF10265.7to138009 10 ft
feet271.8 Driveway307.5to165919
feet .27275.3 Vertical Change REF10276.3to138010 10 ft
feet 1.07284.2 Vertical Change REF10285.2to138011 10 ft
feet .46307.1 Vertical Change REF10308.1to138012 10 ft
feet 5.0-6.0308.8 Cross Slope (PAR)SF29311.8to $120 $3,42015745110ft
feet 6.0-7.0311.8 Cross Slope (PAR)SF25314.4to $120 $2,96415745210ft
feet 8.0-9.0315.2 Cross Slope (PAR)SF10316.3to $120 $1,25415745310ft
feet 12.0-13.0318.0 Cross Slope (PAR)SF140332.7to $120 $16,75815745410ft
feet 2.16320.7 Vertical Change REF10321.7to138013 10 ft
feet 14.0-15.0334.5 Cross Slope (PAR)SF23336.9to $120 $2,73615745510ft
feet 7.0-8.0340.3 Cross Slope (PAR)SF200361.3to $120 $23,94015745610ft
feet .26342.7 Vertical Change REF10343.7to138014 10 ft
feet 5.0-6.0361.8 Cross Slope (PAR)SF83370.5to $120 $9,91815745710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
538
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
PENNINGTON WY
End Street Name
2001161118
Run ID
Bandini Blvd
118.25
ID Sidewalk Width
Priority
feet 6.0-7.0370.5 Cross Slope (PAR)SF10371.5to $120 $1,14015745810ft
feet 5.0-6.0372.0 Cross Slope (PAR)SF203393.4to $120 $24,39615745910ft
feet 5.0-6.0395.9 Cross Slope (PAR)SF27398.7to $120 $3,19215746010ft
feet 6.0-7.0401.4 Cross Slope (PAR)SF43405.9to $120 $5,13015746110ft
feet 5.0-6.0406.5 Cross Slope (PAR)SF15408.1to $120 $1,82415746210ft
feet 6.0-7.0409.4 Cross Slope (PAR)SF42413.8to $120 $5,01615746310ft
feet 6.0-7.0416.3 Cross Slope (PAR)SF13417.7to $120 $1,59615746410ft
feet 5.0-6.0417.7 Cross Slope (PAR)SF13419.1to $120 $1,59615746510ft
feet 6.0-7.0419.3 Cross Slope (PAR)SF10420.4to $120 $1,25415746610ft
feet 5.0-6.0421.6 Cross Slope (PAR)SF14423.1to $120 $1,71015746710ft
feet 6.0-7.0423.6 Cross Slope (PAR)SF29426.6to $120 $3,42015746810ft
feet 5.0-6.0426.6 Cross Slope (PAR)SF105437.7to $120 $12,65415746910ft
feet 6.0-7.0438.4 Cross Slope (PAR)SF45443.1to $120 $5,35815747010ft
feet 4.0-5.0447.3 Cross Slope (PAR)SF67454.4to $120 $8,09415747110ft
feet 5.0-6.0459.3 Cross Slope (PAR)SF60465.6to $120 $7,18215747210ft
feet 4.0-5.0467.8 Cross Slope (PAR)SF52473.3to $120 $6,27015747310ft
feet 5.0-6.0476.2 Cross Slope (PAR)SF166493.7to $120 $19,95015747410ft
feet 6.0-7.0494.8 Cross Slope (PAR)SF29497.8to $120 $3,42015747510ft
feet 5.0-6.0499.2 Cross Slope (PAR)SF151515.1to $120 $18,12615747610ft
feet .49515.8 Vertical Change LF10516.8to $75 $71313801510ft
feet 4.0-5.0518.6 Cross Slope (PAR)SF33522.1to $120 $3,99015747710ft
feet 6.0-7.0522.1 Cross Slope (PAR)SF74529.9to $120 $8,89215747810ft
feet 5.0-6.0529.9 Cross Slope (PAR)SF77538.0to $120 $9,23415747910ft
feet 6.0-7.0538.3 Cross Slope (PAR)SF34541.9to $120 $4,10415748010ft
feet 5.0-6.0541.9 Cross Slope (PAR)SF41546.2to $120 $4,90215748110ft
feet 6.0-7.0546.2 Cross Slope (PAR)SF61552.6to $120 $7,29615748210ft
feet 5.0-6.0550.9 Running Slope REF17552.7to166604 10 ft
feet553.8 Cold Patch 32557.2to140555 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
539
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
PENNINGTON WY
End Street Name
2001161118
Run ID
Bandini Blvd
118.25
ID Sidewalk Width
Priority
feet 4.0-5.0562.7 Cross Slope (PAR)SF14564.2to $120 $1,71015748310ft
feet 6.0-7.0564.9 Cross Slope (PAR)SF41569.2to $120 $4,90215748410ft
feet 5.0-6.0571.0 Cross Slope (PAR)SF46575.8to $120 $5,47215748510ft
feet 5.0-6.0578.7 Cross Slope (PAR)SF20580.8to $120 $2,39415748610ft
feet 6.0-7.0581.4 Cross Slope (PAR)SF27584.2to $120 $3,19215748710ft
feet .88583.0 Vertical Change REF10584.0to138016 10 ft
feet 5.0-6.0584.3 Cross Slope (PAR)SF31587.6to $120 $3,76215748810ft
feet .52588.3 Vertical Change SF10589.3to $75 $71313801710ft
feet 5.0-6.0592.4 Cross Slope (PAR)SF18594.3to $120 $2,16615748910ft
feet 6.0-7.0595.1 Cross Slope (PAR)SF28598.0to $120 $3,30615749010ft
feet 5.0-6.0598.0 Cross Slope (PAR)SF37601.9to $120 $4,44615749110ft
feet .32604.5 Vertical Change LF10605.5to $75 $71313801810ft
feet 6.0-7.0605.8 Cross Slope (PAR)SF30609.0to $120 $3,64815749210ft
feet .75608.1 Vertical Change REF10609.1to138019 10 ft
feet 4.0-5.0610.8 Cross Slope (PAR)SF147626.3to $120 $17,67015749310ft
feet -.45611.4 Vertical Change REF10612.4to138020 10 ft
feet 6.0-7.0626.3 Cross Slope (PAR)SF73634.0to $120 $8,77815749410ft
feet 4.0-5.0636.8 Cross Slope (PAR)SF144652.0to $120 $17,32815749510ft
feet 6.0-7.0654.1 Cross Slope (PAR)SF32657.5to $120 $3,87615749610ft
feet 5.0-6.0657.5 Cross Slope (PAR)SF172675.6to $120 $20,63415749710ft
feet 6.0-7.0676.2 Cross Slope (PAR)SF46681.0to $120 $5,47215749810ft
feet 5.0-6.0684.5 Cross Slope (PAR)SF10685.5to $120 $1,14015749910ft
feet 6.0-7.0685.5 Cross Slope (PAR)SF29688.6to $120 $3,53415750010ft
feet .37688.7 Vertical Change REF10689.7to138021 10 ft
feet 5.0-6.0689.4 Cross Slope (PAR)SF64696.1to $120 $7,63815750110ft
feet 6.0-7.0696.1 Cross Slope (PAR)SF61702.5to $120 $7,29615750210ft
feet 5.0-6.0702.5 Cross Slope (PAR)SF40706.7to $120 $4,78815750310ft
feet 6.0-7.0707.8 Cross Slope (PAR)SF92717.5to $120 $11,05815750410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
540
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
PENNINGTON WY
End Street Name
2001161118
Run ID
Bandini Blvd
118.25
ID Sidewalk Width
Priority
feet 5.0-6.0718.3 Cross Slope (PAR)SF70725.7to $120 $8,43615750510ft
feet 3.0-4.0726.3 Cross Slope (PAR)SF17728.1to $120 $2,05215750610ft
feet .44727.4 Vertical Change REF10728.4to138022 10 ft
feet 6.0-7.0730.4 Cross Slope (PAR)SF17732.2to $120 $2,05215750710ft
feet 5.0-6.0732.2 Cross Slope (PAR)SF32735.6to $120 $3,87615750810ft
feet .26736.9 Vertical Change REF28739.8to138023 10 ft
feet 7.0-8.0737.8 Cross Slope (PAR)SF10738.8to $120 $1,14015750910ft
feet 6.0-7.0742.3 Cross Slope (PAR)SF96752.4to $120 $11,51415751010ft
feet 5.0-6.0753.0 Cross Slope (PAR)SF41757.3to $120 $4,90215751110ft
feet .35762.8 Vertical Change LF10763.8to $75 $71313802410ft
feet .3773.0 Vertical Change LF10774.0to $75 $71313802510ft
feet 14.0-15.0776.8 Cross Slope (PAR)SF43781.3to $120 $5,13015751210ft
feet 11.0-12.0782.6 Cross Slope (PAR)SF10783.7to $120 $1,25415751310ft
feet .3782.7 Vertical Change REF10783.7to138026 10 ft
feet 7.0-8.0786.3 Cross Slope (PAR)SF45791.0to $120 $5,35815751410ft
feet -.43786.8 Vertical Change REF10787.8to138027 10 ft
feet 5.0-6.0789.8 Running Slope REF14791.3to166605 10 ft
$649,600.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:S ATLANTIC BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
541
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161600
Run ID
Bandini Blvd
60.25
ID Sidewalk Width
Priority
feet 2.0-3.02.0 Cross Slope (PAR)SF588.1to $120 $6,95415617210ft
feet 4.0-5.09.1 Cross Slope (PAR)SF4013.3to $120 $4,78815617310ft
feet 2.0-3.013.8 Cross Slope (PAR)SF1115.0to $120 $1,36815617410ft
feet 2.0-3.017.8 Cross Slope (PAR)SF3521.5to $120 $4,21815617510ft
feet 2.0-3.030.8 Cross Slope (PAR)SF1232.1to $120 $1,48215617610ft
feet 4.0-5.032.8 Cross Slope (PAR)SF10443.7to $120 $12,42615617710ft
feet 2.0-3.052.9 Cross Slope (PAR)SF3556.6to $120 $4,21815617810ft
feet .3457.7 Vertical Change LF1058.7to $75 $71313782010ft
feet 2.0-3.071.4 Cross Slope (PAR)SF1272.7to $120 $1,48215617910ft
feet 2.0-3.090.3 Cross Slope (PAR)SF2893.2to $120 $3,30615618010ft
feet 2.0-3.098.9 Cross Slope (PAR)SF127112.3to $120 $15,27615618110ft
feet 5.0-6.0113.3 Cross Slope (PAR)SF14114.8to $120 $1,71015618210ft
feet 3.0-4.0116.2 Cross Slope (PAR)SF10117.3to $120 $1,25415618310ft
feet 2.0-3.0117.3 Cross Slope (PAR)SF36121.1to $120 $4,33215618410ft
feet 4.0-5.0122.5 Cross Slope (PAR)SF111134.2to $120 $13,33815618510ft
feet 4.0-5.0138.3 Cross Slope (PAR)SF126151.6to $120 $15,16215618610ft
feet 2.0-3.0152.3 Cross Slope (PAR)SF10153.3to $120 $1,14015618710ft
feet 2.0-3.0156.2 Cross Slope (PAR)SF10157.3to $120 $1,25415618810ft
feet 5.0-6.0158.5 Cross Slope (PAR)SF13159.9to $120 $1,59615618910ft
feet 4.0-5.0162.0 Cross Slope (PAR)SF87171.2to $120 $10,48815619010ft
feet .32163.2 Vertical Change REF10164.2to137821 10 ft
feet 2.0-3.0174.8 Cross Slope (PAR)SF122187.6to $120 $14,59215619110ft
feet -.3181.3 Vertical Change REF10182.3to137822 10 ft
feet 4.0-5.0189.6 Cross Slope (PAR)SF33193.1to $120 $3,99015619210ft
feet 2.0-3.0194.5 Cross Slope (PAR)SF12195.8to $120 $1,48215619310ft
feet 3.0-4.0199.3 Cross Slope (PAR)SF18201.2to $120 $2,16615619410ft
feet 5.0-6.0202.9 Cross Slope (PAR)SF14204.4to $120 $1,71015619510ft
feet 6.0-7.0204.4 Cross Slope (PAR)SF42208.8to $120 $5,01615619610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
542
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161600
Run ID
Bandini Blvd
60.25
ID Sidewalk Width
Priority
feet208.8 Cold Patch 40213.0to140541 10 ft
feet .32211.4 Vertical Change LF10212.4to $75 $71313782310ft
feet 5.0-6.0217.1 Cross Slope (PAR)SF16218.8to $120 $1,93815619710ft
feet 5.0-6.0220.9 Cross Slope (PAR)SF28223.8to $120 $3,30615619810ft
feet .42227.5 Vertical Change LF10228.5to $75 $71313782410ft
feet 3.0-4.0229.1 Cross Slope (PAR)SF12230.4to $120 $1,48215619910ft
feet 6.0-7.0231.5 Cross Slope (PAR)SF11232.7to $120 $1,36815620010ft
feet -.28237.0 Vertical Change LF10238.0to $75 $71313782510ft
feet 2.0-3.0238.5 Cross Slope (PAR)SF15240.1to $120 $1,82415620110ft
feet 2.0-3.0265.3 Cross Slope (PAR)SF43269.8to $120 $5,13015620210ft
feet 2.0-3.0274.0 Cross Slope (PAR)SF28276.9to $120 $3,30615620310ft
feet 2.0-3.0285.6 Cross Slope (PAR)SF40289.8to $120 $4,78815620410ft
feet .55285.7 Vertical Change REF10286.7to137826 10 ft
feet 2.0-3.0292.3 Cross Slope (PAR)SF97302.5to $120 $11,62815620510ft
feet .69294.6 Vertical Change REF10295.6to137827 10 ft
feet -.26301.4 Vertical Change REF10302.4to137828 10 ft
feet 2.0-3.0304.8 Cross Slope (PAR)SF43309.3to $120 $5,13015620610ft
feet .29307.4 Vertical Change REF10308.4to137829 10 ft
feet .39313.6 Vertical Change LF10314.6to $75 $71313783010ft
feet 3.0-4.0315.3 Cross Slope (PAR)SF17317.1to $120 $2,05215620710ft
feet .26319.5 Vertical Change REF10320.5to137831 10 ft
feet 2.0-3.0320.5 Cross Slope (PAR)SF19322.5to $120 $2,28015620810ft
feet 2.0-3.0327.3 Cross Slope (PAR)SF29330.3to $120 $3,42015620910ft
feet 2.0-3.0335.2 Cross Slope (PAR)SF71342.7to $120 $8,55015621010ft
feet 2.0-3.0351.2 Cross Slope (PAR)SF44355.8to $120 $5,24415621110ft
feet 2.0-3.0364.8 Cross Slope (PAR)SF60371.1to $120 $7,18215621210ft
feet 3.0-4.0374.7 Cross Slope (PAR)SF12376.0to $120 $1,48215621310ft
feet 2.0-3.0376.5 Cross Slope (PAR)SF15378.1to $120 $1,82415621410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
543
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161600
Run ID
Bandini Blvd
60.25
ID Sidewalk Width
Priority
feet 3.0-4.0380.2 Cross Slope (PAR)SF22382.5to $120 $2,62215621510ft
feet 2.0-3.0382.5 Cross Slope (PAR)SF50387.8to $120 $6,04215621610ft
feet .3385.3 Vertical Change REF35389.0to137832 10 ft
feet 2.0-3.0393.3 Cross Slope (PAR)SF10394.3to $120 $1,14015621710ft
feet .42398.6 Vertical Change LF10399.6to $75 $71313783310ft
feet -.3400.9 Vertical Change REF10401.9to137834 10 ft
feet 2.0-3.0401.9 Cross Slope (PAR)SF54407.6to $120 $6,49815621810ft
feet 4.0-5.0411.2 Cross Slope (PAR)SF72418.8to $120 $8,66415621910ft
feet 2.0-3.0419.3 Cross Slope (PAR)SF146434.7to $120 $17,55615622010ft
feet 3.0-4.0438.0 Cross Slope (PAR)SF12439.3to $120 $1,48215622110ft
feet 3.0-4.0443.0 Cross Slope (PAR)SF10444.1to $120 $1,25415622210ft
feet 2.0-3.0444.6 Cross Slope (PAR)SF55450.4to $120 $6,61215622310ft
feet 2.0-3.0475.3 Cross Slope (PAR)SF14476.8to $120 $1,71015622410ft
feet .27492.2 Vertical Change LF10493.2to $75 $71313783510ft
feet -.34494.9 Vertical Change LF10495.9to $75 $71313783610ft
feet 3.0-4.0500.7 Cross Slope (PAR)SF45505.4to $120 $5,35815622510ft
feet 2.0-3.0508.8 Cross Slope (PAR)SF113520.7to $120 $13,56615622610ft
feet 2.0-3.0523.1 Cross Slope (PAR)SF86532.2to $120 $10,37415622710ft
feet 2.0-3.0535.8 Cross Slope (PAR)SF12537.1to $120 $1,48215622810ft
feet 2.0-3.0541.2 Cross Slope (PAR)SF33544.7to $120 $3,99015622910ft
feet 2.0-3.0547.3 Cross Slope (PAR)SF11548.5to $120 $1,36815623010ft
feet 2.0-3.0550.7 Cross Slope (PAR)SF37554.6to $120 $4,44615623110ft
feet 4.0-5.0554.8 Cross Slope (PAR)SF32558.2to $120 $3,87615623210ft
feet 3.0-4.0582.6 Cross Slope (PAR)SF35586.3to $120 $4,21815623310ft
feet 2.0-3.0595.3 Cross Slope (PAR)SF18597.2to $120 $2,16615623410ft
feet 2.0-3.0599.8 Cross Slope (PAR)SF97610.0to $120 $11,62815623510ft
feet 2.0-3.0612.8 Cross Slope (PAR)SF19614.8to $120 $2,28015623610ft
feet .33632.0 Vertical Change LF10633.0to $75 $71313783810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
544
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161600
Run ID
Bandini Blvd
60.25
ID Sidewalk Width
Priority
feet .28639.9 Vertical Change LF10640.9to $75 $71313783910ft
feet -.32645.8 Vertical Change LF10646.8to $75 $71313784010ft
feet 3.0-4.0658.4 Cross Slope (PAR)SF25661.0to $120 $2,96415623710ft
feet .29661.0 Vertical Change REF10662.0to137841 10 ft
feet 5.0-6.0661.3 Cross Slope (PAR)SF46666.1to $120 $5,47215623810ft
feet 3.0-4.0666.4 Cross Slope (PAR)SF14667.9to $120 $1,71015623910ft
feet 3.0-4.0671.5 Cross Slope (PAR)SF14673.0to $120 $1,71015624010ft
feet 2.0-3.0676.5 Cross Slope (PAR)SF31679.8to $120 $3,76215624110ft
feet 4.0-5.0682.1 Cross Slope (PAR)SF11683.3to $120 $1,36815624210ft
feet .29683.3 Vertical Change REF10684.3to137842 10 ft
feet 2.0-3.0684.4 Cross Slope (PAR)SF10685.4to $120 $1,14015624310ft
feet 2.0-3.0689.7 Cross Slope (PAR)SF28692.6to $120 $3,30615624410ft
feet -.28691.7 Vertical Change REF10692.7to137843 10 ft
feet 3.0-4.0711.4 Cross Slope (PAR)SF105722.4to $120 $12,54015624510ft
feet 4.0-5.0725.3 Cross Slope (PAR)SF80733.7to $120 $9,57615624610ft
feet 3.0-4.0739.3 Cross Slope (PAR)SF10740.4to $120 $1,25415624710ft
feet 4.0-5.0747.1 Cross Slope (PAR)SF137761.5to $120 $16,41615624810ft
feet 2.0-3.0762.0 Cross Slope (PAR)SF150777.8to $120 $18,01215624910ft
feet 4.0-5.0779.8 Cross Slope (PAR)SF36783.6to $120 $4,33215625010ft
feet 2.0-3.0783.8 Cross Slope (PAR)SF109795.3to $120 $13,11015625110ft
feet 2.0-3.0802.1 Cross Slope (PAR)SF10803.1to $120 $1,14015625210ft
feet 2.0-3.0806.0 Cross Slope (PAR)SF10807.0to $120 $1,14015625310ft
feet 2.0-3.0813.5 Cross Slope (PAR)SF75821.4to $120 $9,00615625410ft
feet 2.0-3.0838.6 Cross Slope (PAR)SF11839.8to $120 $1,36815625510ft
feet 2.0-3.0844.0 Cross Slope (PAR)SF26846.7to $120 $3,07815625610ft
feet 2.0-3.0852.7 Cross Slope (PAR)SF36856.5to $120 $4,33215625710ft
feet .28853.7 Vertical Change REF10854.7to137844 10 ft
feet 2.0-3.0860.8 Cross Slope (PAR)SF20862.9to $120 $2,39415625810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
545
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161600
Run ID
Bandini Blvd
60.25
ID Sidewalk Width
Priority
feet .28861.5 Vertical Change REF10862.5to137845 10 ft
feet862.9 Driveway899.7to165859
feet 2.0-3.0901.4 Cross Slope (PAR)SF47906.3to $120 $5,58615625910ft
feet 2.0-3.0910.5 Cross Slope (PAR)SF32913.9to $120 $3,87615626010ft
feet 2.0-3.0921.8 Cross Slope (PAR)SF18923.7to $120 $2,16615626110ft
feet924.5 Driveway969.8to165860
feet924.5 Driveway1033.3to165861
feet .75938.2 Vertical Change REF10939.2to137846 10 ft
feet 2.0-3.0980.8 Cross Slope (Driveway)SF25983.4to $40 $98815626210ft
feet 2.0-3.0991.4 Cross Slope (Driveway)SF14992.9to $40 $57015626310ft
feet -.26993.0 Vertical Change REF10994.0to137847 10 ft
feet 2.0-3.01002.8 Cross Slope (Driveway)SF481007.8to $40 $1,90015626410ft
feet 3.0-4.01010.8 Cross Slope (Driveway)SF331014.3to $40 $1,33015626510ft
feet 5.0-6.01018.1 Running Slope REF111019.3to166551 10 ft
feet 3.0-4.01020.5 Cross Slope (Driveway)SF251023.1to $40 $98815626610ft
feet 6.0-7.01030.8 Running Slope REF221033.1to166552 10 ft
$469,385.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:S INDIANA ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
546
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001171104
Run ID
Bandini Blvd
45.25
ID Sidewalk Width
Priority
feet 2.0-3.010.2 Cross Slope (PAR)SF1912.2to $120 $2,28015844310ft
feet .2713.7 Vertical Change LF1014.7to $75 $71313821910ft
feet .2825.2 Vertical Change LF1026.2to $75 $71313822010ft
feet 2.0-3.043.1 Cross Slope (PAR)SF11655.3to $120 $13,90815844410ft
feet .7448.4 Vertical Change REF1049.4to138221 10 ft
feet 2.0-3.060.6 Cross Slope (PAR)SF10271.3to $120 $12,19815844510ft
feet -.2871.5 Vertical Change LF1072.5to $75 $71313822210ft
feet 2.0-3.075.2 Cross Slope (PAR)SF3578.9to $120 $4,21815844610ft
feet 3.0-4.081.3 Cross Slope (PAR)SF2383.7to $120 $2,73615844710ft
feet 2.0-3.083.7 Cross Slope (PAR)SF1685.4to $120 $1,93815844810ft
feet 2.0-3.094.9 Cross Slope (PAR)SF2897.8to $120 $3,30615844910ft
feet -.3396.6 Vertical Change REF1097.6to138223 10 ft
feet .47104.7 Vertical Change LF10105.7to $75 $71313822410ft
feet 2.0-3.0113.8 Cross Slope (PAR)SF43118.3to $120 $5,13015845010ft
feet 2.0-3.0136.9 Cross Slope (PAR)SF13138.3to $120 $1,59615845110ft
feet 3.0-4.0142.8 Cross Slope (PAR)SF33146.3to $120 $3,99015845210ft
feet .31146.8 Vertical Change LF10147.8to $75 $71313822510ft
feet 2.0-3.0160.8 Cross Slope (PAR)SF25163.4to $120 $2,96415845310ft
feet 2.0-3.0168.9 Cross Slope (PAR)SF10169.9to $120 $1,14015845410ft
feet 4.0-5.0172.3 Cross Slope (PAR)SF15173.9to $120 $1,82415845510ft
feet 2.0-3.0174.7 Cross Slope (PAR)SF15176.3to $120 $1,82415845610ft
feet176.3 Driveway204.6to165976
feet 3.0-4.0204.6 Cross Slope (Driveway)SF24207.1to $40 $95015845710ft
feet 2.0-3.0209.4 Cross Slope (PAR)SF25212.0to $120 $2,96415845810ft
feet 4.0-5.0212.2 Cross Slope (PAR)SF10213.2to $120 $1,14015845910ft
feet 4.0-5.0217.6 Cross Slope (PAR)SF29220.6to $120 $3,42015846010ft
feet .29220.4 Vertical Change REF10221.4to138226 10 ft
feet .32233.0 Vertical Change LF10234.0to $75 $71313822710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
547
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001171104
Run ID
Bandini Blvd
45.25
ID Sidewalk Width
Priority
feet 2.0-3.0235.0 Cross Slope (PAR)SF32238.4to $120 $3,87615846110ft
feet 2.0-3.0242.0 Cross Slope (PAR)SF22244.3to $120 $2,62215846210ft
feet 4.0-5.0246.3 Cross Slope (PAR)SF35250.0to $120 $4,21815846310ft
feet 3.0-4.0253.4 Cross Slope (PAR)SF12254.7to $120 $1,48215846410ft
feet 2.0-3.0254.7 Cross Slope (PAR)SF12256.0to $120 $1,48215846510ft
feet 2.0-3.0258.4 Cross Slope (PAR)SF12259.7to $120 $1,48215846610ft
feet 2.0-3.0266.0 Cross Slope (PAR)SF26268.7to $120 $3,07815846710ft
feet .35266.6 Vertical Change REF10267.6to138228 10 ft
feet 3.0-4.0293.5 Cross Slope (PAR)SF177312.1to $120 $21,20415846810ft
feet 2.0-3.0312.1 Cross Slope (PAR)SF21314.3to $120 $2,50815846910ft
feet .38313.9 Vertical Change REF36317.7to138230 10 ft
feet 3.0-4.0317.7 Cross Slope (PAR)SF21319.9to $120 $2,50815847010ft
feet 2.0-3.0323.0 Cross Slope (PAR)SF15324.6to $120 $1,82415847110ft
feet 2.0-3.0327.4 Cross Slope (PAR)SF15329.0to $120 $1,82415847210ft
feet 2.0-3.0331.8 Cross Slope (PAR)SF128345.3to $120 $15,39015847310ft
feet 2.0-3.0349.7 Cross Slope (PAR)SF41354.0to $120 $4,90215847410ft
feet 2.0-3.0360.3 Cross Slope (PAR)SF16362.0to $120 $1,93815847510ft
feet -.27365.7 Vertical Change LF10366.7to $75 $71313823110ft
feet 3.0-4.0368.6 Cross Slope (PAR)SF13370.0to $120 $1,59615847610ft
feet 2.0-3.0370.3 Cross Slope (PAR)SF64377.0to $120 $7,63815847710ft
feet 2.0-3.0384.3 Cross Slope (PAR)SF10385.3to $120 $1,14015847810ft
feet 4.0-5.0386.6 Cross Slope (PAR)SF35390.3to $120 $4,21815847910ft
feet 2.0-3.0391.3 Cross Slope (PAR)SF104402.2to $120 $12,42615848010ft
feet .72402.9 Vertical Change SF10403.9to $75 $71313823210ft
feet -.33406.1 Vertical Change LF10407.1to $75 $71313823310ft
feet 3.0-4.0407.5 Cross Slope (PAR)SF23409.9to $120 $2,73615848110ft
feet 2.0-3.0412.7 Cross Slope (PAR)SF25415.3to $120 $2,96415848210ft
feet 5.0-6.0413.1 Running Slope REF11414.3to166627 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
548
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001171104
Run ID
Bandini Blvd
45.25
ID Sidewalk Width
Priority
feet415.3 Driveway464.3to165977
feet 2.0-3.0469.6 Cross Slope (PAR)SF10470.6to $120 $1,14015848310ft
feet 2.0-3.0485.1 Cross Slope (PAR)SF59491.3to $120 $7,06815848410ft
feet 2.0-3.0493.4 Cross Slope (PAR)SF19495.4to $120 $2,28015848510ft
feet 2.0-3.0499.5 Cross Slope (PAR)SF36503.3to $120 $4,33215848610ft
feet 3.0-4.0507.8 Cross Slope (PAR)SF54513.5to $120 $6,49815848710ft
feet 2.0-3.0514.2 Cross Slope (PAR)SF23516.6to $120 $2,73615848810ft
feet 2.0-3.0526.3 Cross Slope (PAR)SF180545.2to $120 $21,54615848910ft
feet 4.0-5.0545.2 Cross Slope (PAR)SF10546.2to $120 $1,14015849010ft
feet 3.0-4.0549.1 Cross Slope (PAR)SF11550.3to $120 $1,36815849110ft
feet 3.0-4.0553.9 Cross Slope (PAR)SF10554.9to $120 $1,14015849210ft
feet 3.0-4.0557.4 Cross Slope (PAR)SF34561.0to $120 $4,10415849310ft
feet 2.0-3.0562.9 Cross Slope (PAR)SF12564.2to $120 $1,48215849410ft
feet 2.0-3.0567.3 Cross Slope (PAR)SF45572.0to $120 $5,35815849510ft
feet 2.0-3.0575.3 Cross Slope (PAR)SF12576.6to $120 $1,48215849610ft
feet 4.0-5.0581.9 Cross Slope (PAR)SF24584.4to $120 $2,85015849710ft
feet 2.0-3.0585.8 Cross Slope (PAR)SF54591.5to $120 $6,49815849810ft
feet .5594.5 Vertical Change REF10595.5to138234 10 ft
feet 2.0-3.0595.3 Cross Slope (PAR)SF67602.4to $120 $8,09415849910ft
feet 2.0-3.0609.3 Cross Slope (PAR)SF60615.6to $120 $7,18215850010ft
feet 2.0-3.0618.3 Cross Slope (PAR)SF216641.0to $120 $25,87815850110ft
feet 3.0-4.0643.5 Cross Slope (PAR)SF67650.6to $120 $8,09415850210ft
feet 2.0-3.0651.2 Cross Slope (PAR)SF10652.2to $120 $1,14015850310ft
feet 2.0-3.0654.3 Cross Slope (PAR)SF15655.9to $120 $1,82415850410ft
feet 2.0-3.0658.8 Cross Slope (PAR)SF105669.9to $120 $12,65415850510ft
feet 2.0-3.0690.1 Cross Slope (PAR)SF49695.3to $120 $5,92815850610ft
feet 2.0-3.0700.3 Cross Slope (PAR)SF100710.8to $120 $11,97015850710ft
feet 2.0-3.0716.0 Cross Slope (PAR)SF12717.3to $120 $1,48215850810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
549
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001171104
Run ID
Bandini Blvd
45.25
ID Sidewalk Width
Priority
feet 3.0-4.0719.8 Cross Slope (PAR)SF124732.9to $120 $14,93415850910ft
feet 2.0-3.0735.8 Cross Slope (PAR)SF24738.3to $120 $2,85015851010ft
feet 2.0-3.0740.5 Cross Slope (PAR)SF105751.6to $120 $12,65415851110ft
feet 3.0-4.0757.3 Cross Slope (PAR)SF25759.9to $120 $2,96415851210ft
feet 2.0-3.0761.8 Cross Slope (PAR)SF10762.9to $120 $1,25415851310ft
feet764.0 Driveway807.7to165978
feet 3.0-4.0809.4 Cross Slope (PAR)SF36813.2to $120 $4,33215851410ft
feet 2.0-3.0814.3 Cross Slope (PAR)SF18816.2to $120 $2,16615851510ft
feet -.54816.6 Vertical Change SF10817.6to $75 $71313823510ft
feet 4.0-5.0829.3 Cross Slope (PAR)SF57835.3to $120 $6,84015851610ft
feet 2.0-3.0835.3 Cross Slope (PAR)SF249861.5to $120 $29,86815851710ft
feet 4.0-5.0866.8 Cross Slope (PAR)SF14868.3to $120 $1,71015851810ft
feet 2.0-3.0874.7 Cross Slope (PAR)SF10875.7to $120 $1,14015851910ft
feet876.9 Driveway912.8to165979
feet 2.0-3.0916.2 Cross Slope (PAR)SF225939.9to $120 $27,01815852010ft
feet 4.0-5.0941.2 Cross Slope (PAR)SF225964.9to $120 $27,01815852110ft
feet965.6 Driveway998.1to165980
feet 3.0-4.0998.1 Cross Slope (Driveway)SF681005.3to $40 $2,73615852210ft
feet 2.0-3.01005.4 Cross Slope (PAR)SF101006.4to $120 $1,14015852310ft
feet 2.0-3.01023.6 Cross Slope (PAR)SF591029.8to $120 $7,06815852410ft
feet 2.0-3.01046.3 Cross Slope (PAR)SF331049.8to $120 $3,99015852510ft
feet 2.91047.4 Vertical Change REF101048.4to138236 10 ft
feet 4.0-5.01050.6 Cross Slope (PAR)SF171052.4to $120 $2,05215852610ft
feet1052.4 Driveway1084.3to165981
feet1052.4 Driveway1191.8to165982
feet 3.0-4.01084.3 Cross Slope (Driveway)SF381088.3to $40 $1,52015852710ft
feet 4.0-5.01091.9 Cross Slope (Driveway)SF621098.4to $40 $2,47015852810ft
feet .341101.7 Vertical Change REF101102.7to138237 10 ft
feet 2.0-3.01108.3 Cross Slope (Driveway)SF121109.6to $40 $49415852910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
550
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001171104
Run ID
Bandini Blvd
45.25
ID Sidewalk Width
Priority
feet 2.0-3.01112.3 Cross Slope (Driveway)SF1251125.5to $40 $5,01615853010ft
feet 3.011131.1 Vertical Change REF101132.1to138238 10 ft
feet 2.0-3.01135.4 Cross Slope (Driveway)SF151137.0to $40 $60815853110ft
feet 2.0-3.01142.6 Cross Slope (Driveway)SF191144.6to $40 $76015853210ft
feet 3.0-4.01149.2 Cross Slope (Driveway)SF151150.8to $40 $60815853310ft
feet 2.0-3.01151.1 Cross Slope (Driveway)SF991161.5to $40 $3,95215853410ft
feet 2.0-3.01167.5 Cross Slope (Driveway)SF161169.2to $40 $64615853510ft
feet 3.0-4.01171.6 Cross Slope (Driveway)SF121172.9to $40 $49415853610ft
feet 4.0-5.01180.7 Cross Slope (Driveway)SF171182.5to $40 $68415853710ft
feet 2.0-3.01184.5 Cross Slope (Driveway)SF461189.3to $40 $1,82415853810ft
$503,785.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:S INDIANA ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
551
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SOTO ST
Survey Street Name Starting Street Name
EAST SIDE OF LA RIVER
End Street Name
2001151231
Run ID
Bandini Blvd
105.75
ID Sidewalk Width
Priority
feet 4.0-5.03.6 Cross Slope (PAR)SF469.7to $120 $5,4901552158ft
feet 6.0-7.09.8 Cross Slope (PAR)SF1611.9to $120 $1,8901552168ft
feet 3.0-4.013.3 Cross Slope (PAR)SF1515.3to $120 $1,8001552178ft
feet 2.0-3.015.3 Cross Slope (PAR)SF14134.1to $120 $16,9201552188ft
feet -.2821.9 Vertical Change REF822.9to137635 8 ft
feet 4.0-5.034.6 Cross Slope (PAR)SF8345.7to $120 $9,9901552198ft
feet 2.0-3.046.0 Cross Slope (PAR)SF9658.8to $120 $11,5201552208ft
feet 1.0849.5 Vertical Change REF850.5to137636 8 ft
feet 2.0-3.062.8 Cross Slope (PAR)SF4568.8to $120 $5,4001552218ft
feet 4.0-5.068.8 Cross Slope (PAR)SF3773.7to $120 $4,4101552228ft
feet 3.0-4.091.6 Cross Slope (PAR)SF892.7to $120 $9901552238ft
feet .6591.9 Vertical Change REF892.9to137637 8 ft
feet .5796.4 Vertical Change REF897.4to137638 8 ft
feet 2.0-3.096.8 Cross Slope (PAR)SF1198.2to $120 $1,2601552248ft
feet 2.0-3.0101.7 Cross Slope (PAR)SF8102.8to $120 $9901552258ft
feet 2.0-3.0109.8 Cross Slope (PAR)SF92122.0to $120 $10,9801552268ft
feet 2.0-3.0125.7 Cross Slope (PAR)SF86137.1to $120 $10,2601552278ft
feet 4.0-5.0137.1 Cross Slope (PAR)SF9138.3to $120 $1,0801552288ft
feet 3.0-4.0141.3 Cross Slope (PAR)SF34145.8to $120 $4,0501552298ft
feet 3.0-4.0148.5 Cross Slope (PAR)SF54155.7to $120 $6,4801552308ft
feet .47154.2 Vertical Change REF8155.2to137639 8 ft
feet 2.0-3.0157.3 Cross Slope (PAR)SF15159.3to $120 $1,8001552318ft
feet 3.0-4.0162.0 Cross Slope (PAR)SF129179.2to $120 $15,4801552328ft
feet 2.0-3.0179.2 Cross Slope (PAR)SF8180.2to $120 $9001552338ft
feet 2.0-3.0183.1 Cross Slope (PAR)SF64191.6to $120 $7,6501552348ft
feet 4.0-5.0192.4 Cross Slope (PAR)SF50199.0to $120 $5,9401552358ft
feet 2.0-3.0201.2 Cross Slope (PAR)SF45207.2to $120 $5,4001552368ft
feet 2.48204.9 Vertical Change SF8205.9to $75 $5631376408ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
552
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SOTO ST
Survey Street Name Starting Street Name
EAST SIDE OF LA RIVER
End Street Name
2001151231
Run ID
Bandini Blvd
105.75
ID Sidewalk Width
Priority
feet 3.0-4.0209.8 Cross Slope (PAR)SF11211.3to $120 $1,3501552378ft
feet 2.0-3.0211.3 Cross Slope (PAR)SF32215.5to $120 $3,7801552388ft
feet 4.0-5.0217.0 Cross Slope (PAR)SF14218.8to $120 $1,6201552398ft
feet 4.0-5.0221.0 Cross Slope (PAR)SF92233.3to $120 $11,0701552408ft
feet 3.0-4.0236.8 Cross Slope (PAR)SF25240.1to $120 $2,9701552418ft
feet -.26242.9 Vertical Change LF8243.9to $75 $5631376418ft
feet 2.0-3.0245.7 Cross Slope (PAR)SF71255.2to $120 $8,5501552428ft
feet .26249.5 Vertical Change REF8250.5to137642 8 ft
feet 2.0-3.0265.9 Cross Slope (PAR)SF14267.8to $120 $1,7101552438ft
feet 2.0-3.0270.4 Cross Slope (PAR)SF112285.3to $120 $13,4101552448ft
feet 3.0-4.0288.0 Cross Slope (PAR)SF8289.1to $120 $9901552458ft
feet 2.0-3.0289.1 Cross Slope (PAR)SF15291.1to $120 $1,8001552468ft
feet 4.0-5.0296.8 Cross Slope (PAR)SF64305.4to $120 $7,7401552478ft
feet 2.0-3.0305.4 Cross Slope (PAR)SF54312.6to $120 $6,4801552488ft
feet 1.65310.4 Vertical Change REF8311.4to137643 8 ft
feet 4.0-5.0313.0 Cross Slope (PAR)SF347359.2to $120 $41,5801552498ft
feet 1.23321.0 Vertical Change REF8322.0to137644 8 ft
feet 2.0-3.0359.2 Cross Slope (PAR)SF11360.6to $120 $1,2601552508ft
feet .32363.8 Vertical Change LF8364.8to $75 $5631376458ft
feet 4.0-5.0366.2 Cross Slope (PAR)SF20368.9to $120 $2,4301552518ft
feet 2.0-3.0370.3 Cross Slope (PAR)SF38375.3to $120 $4,5001552528ft
feet 2.0-3.0378.2 Cross Slope (PAR)SF41383.6to $120 $4,8601552538ft
feet 2.0-3.0392.3 Cross Slope (PAR)SF30396.3to $120 $3,6001552548ft
feet 2.0-3.0398.9 Cross Slope (PAR)SF100412.2to $120 $11,9701552558ft
feet 2.0-3.0419.5 Cross Slope (PAR)SF14421.3to $120 $1,6201552568ft
feet .26430.3 Vertical Change LF8431.3to $75 $5631376468ft
feet 2.0-3.0447.4 Cross Slope (PAR)SF59455.2to $120 $7,0201552578ft
feet 2.0-3.0469.8 Cross Slope (PAR)SF27473.4to $120 $3,2401552588ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
553
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SOTO ST
Survey Street Name Starting Street Name
EAST SIDE OF LA RIVER
End Street Name
2001151231
Run ID
Bandini Blvd
105.75
ID Sidewalk Width
Priority
feet 2.0-3.0482.2 Cross Slope (PAR)SF23485.3to $120 $2,7901552598ft
feet 2.0-3.0488.3 Cross Slope (PAR)SF59496.2to $120 $7,1101552608ft
feet 2.0-3.0502.0 Cross Slope (PAR)SF8503.1to $120 $9901552618ft
feet 2.0-3.0510.4 Cross Slope (PAR)SF17512.7to $120 $2,0701552628ft
feet 2.0-3.0518.0 Cross Slope (PAR)SF163539.8to $120 $19,6201552638ft
feet 2.0-3.0543.0 Cross Slope (PAR)SF28546.8to $120 $3,4201552648ft
feet 2.0-3.0555.6 Cross Slope (PAR)SF161577.0to $120 $19,2601552658ft
feet 2.0-3.0590.8 Cross Slope (PAR)SF47597.1to $120 $5,6701552668ft
feet 3.0-4.0599.5 Cross Slope (PAR)SF11601.0to $120 $1,3501552678ft
feet 2.0-3.0601.0 Cross Slope (PAR)SF38606.0to $120 $4,5001552688ft
feet 2.0-3.0618.6 Cross Slope (PAR)SF57626.2to $120 $6,8401552698ft
feet 2.0-3.0628.9 Cross Slope (PAR)SF30632.9to $120 $3,6001552708ft
feet 2.0-3.0641.2 Cross Slope (PAR)SF38646.3to $120 $4,5901552718ft
feet 2.0-3.0650.8 Cross Slope (PAR)SF71660.3to $120 $8,5501552728ft
feet 2.0-3.0665.3 Cross Slope (PAR)SF31669.4to $120 $3,6901552738ft
feet 2.0-3.0676.3 Cross Slope (PAR)SF43682.0to $120 $5,1301552748ft
feet 2.0-3.0689.4 Cross Slope (PAR)SF96702.2to $120 $11,5201552758ft
feet .52691.7 Vertical Change REF8692.7to137647 8 ft
feet 3.0-4.0704.3 Cross Slope (PAR)SF12705.9to $120 $1,4401552768ft
feet 2.0-3.0707.6 Cross Slope (PAR)SF36712.4to $120 $4,3201552778ft
feet 2.0-3.0716.4 Cross Slope (PAR)SF15718.4to $120 $1,8001552788ft
feet 3.0-4.0722.8 Cross Slope (PAR)SF23725.9to $120 $2,7901552798ft
feet 2.0-3.0725.9 Cross Slope (PAR)SF43731.6to $120 $5,1301552808ft
feet 2.0-3.0736.2 Cross Slope (PAR)SF117751.8to $120 $14,0401552818ft
feet 2.0-3.0764.8 Cross Slope (PAR)SF38769.9to $120 $4,5901552828ft
feet 2.0-3.0776.5 Cross Slope (PAR)SF137794.8to $120 $16,4701552838ft
feet .96782.6 Vertical Change REF8783.6to137648 8 ft
feet 2.0-3.0805.3 Cross Slope (PAR)SF94817.8to $120 $11,2501552848ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
554
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SOTO ST
Survey Street Name Starting Street Name
EAST SIDE OF LA RIVER
End Street Name
2001151231
Run ID
Bandini Blvd
105.75
ID Sidewalk Width
Priority
feet 2.0-3.0822.5 Cross Slope (PAR)SF61830.6to $120 $7,2901552858ft
feet 2.0-3.0855.9 Cross Slope (PAR)SF59863.8to $120 $7,1101552868ft
feet 2.0-3.0880.2 Cross Slope (PAR)SF128897.2to $120 $15,3001552878ft
feet 3.0-4.0905.8 Cross Slope (PAR)SF27909.4to $120 $3,2401552888ft
feet 2.0-3.0910.5 Cross Slope (PAR)SF14912.3to $120 $1,6201552898ft
feet 2.0-3.0916.9 Cross Slope (PAR)SF26920.3to $120 $3,0601552908ft
feet 2.0-3.0939.0 Cross Slope (PAR)SF29942.8to $120 $3,4201552918ft
feet 2.0-3.0952.5 Cross Slope (PAR)SF46958.6to $120 $5,4901552928ft
feet 2.0-3.0961.5 Cross Slope (PAR)SF40966.8to $120 $4,7701552938ft
feet 2.0-3.0970.5 Cross Slope (PAR)SF14972.3to $120 $1,6201552948ft
feet 2.0-3.0978.1 Cross Slope (PAR)SF59986.0to $120 $7,1101552958ft
feet 2.0-3.0991.9 Cross Slope (PAR)SF10993.2to $120 $1,1701552968ft
feet 2.0-3.0997.8 Cross Slope (PAR)SF201000.4to $120 $2,3401552978ft
feet 2.0-3.01006.2 Cross Slope (PAR)SF551013.5to $120 $6,5701552988ft
feet 5.0-6.01020.6 Running Slope REF261024.1to166537 8 ft
feet 6.0-7.01021.3 Cross Slope (PAR)SF201024.0to $120 $2,4301552998ft
$521,550.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:S SOTO ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
555
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
BONNIE BEACH PL
End Street Name
2001161309
Run ID
Bandini Blvd
46
ID Sidewalk Width
Priority
feet 2.0-3.00.1 Cross Slope (PAR)SF333.6to $120 $3,99015671510ft
feet 2.0-3.07.0 Cross Slope (PAR)SF279.8to $120 $3,19215671610ft
feet 2.0-3.032.3 Cross Slope (PAR)SF13746.7to $120 $16,41615671710ft
feet 2.0-3.050.2 Cross Slope (PAR)SF1051.2to $120 $1,14015671810ft
feet -.2760.8 Vertical Change LF1061.8to $75 $71313792410ft
feet 2.0-3.069.0 Cross Slope (PAR)SF8878.3to $120 $10,60215671910ft
feet 2.0-3.084.7 Cross Slope (PAR)SF6091.0to $120 $7,18215672010ft
feet 2.0-3.095.3 Cross Slope (PAR)SF85104.2to $120 $10,14615672110ft
feet 2.0-3.0108.0 Cross Slope (PAR)SF118120.4to $120 $14,13615672210ft
feet 2.0-3.0129.3 Cross Slope (PAR)SF25131.9to $120 $2,96415672310ft
feet 2.0-3.0135.4 Cross Slope (PAR)SF18137.3to $120 $2,16615672410ft
feet 2.0-3.0142.2 Cross Slope (PAR)SF86151.3to $120 $10,37415672510ft
feet 2.0-3.0158.9 Cross Slope (PAR)SF22161.2to $120 $2,62215672610ft
feet 2.0-3.0166.8 Cross Slope (PAR)SF14168.3to $120 $1,71015672710ft
feet 2.0-3.0175.0 Cross Slope (PAR)SF107186.3to $120 $12,88215672810ft
feet 2.0-3.0206.0 Cross Slope (PAR)SF25208.6to $120 $2,96415672910ft
feet209.0 Driveway260.7to165896
feet 2.0-3.0263.2 Cross Slope (PAR)SF29266.2to $120 $3,42015673010ft
feet 2.0-3.0272.8 Cross Slope (PAR)SF29275.9to $120 $3,53415673110ft
feet 2.0-3.0281.8 Cross Slope (PAR)SF76289.8to $120 $9,12015673210ft
feet 2.0-3.0293.8 Cross Slope (PAR)SF181312.8to $120 $21,66015673310ft
feet 2.0-3.0315.2 Cross Slope (PAR)SF478365.5to $120 $57,34215673410ft
feet 2.0-3.0369.7 Cross Slope (PAR)SF11370.9to $120 $1,36815673510ft
feet371.8 Driveway416.6to165897
feet 2.0-3.0420.5 Cross Slope (PAR)SF103431.3to $120 $12,31215673610ft
feet440.9 Driveway471.9to165898
feet 2.0-3.0473.8 Cross Slope (PAR)SF76481.8to $120 $9,12015673710ft
feet 4.0-5.0481.8 Cross Slope (PAR)SF90491.3to $120 $10,83015673810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
556
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
BONNIE BEACH PL
End Street Name
2001161309
Run ID
Bandini Blvd
46
ID Sidewalk Width
Priority
feet 2.0-3.0491.3 Cross Slope (PAR)SF28494.2to $120 $3,30615673910ft
feet 4.0-5.0495.9 Cross Slope (PAR)SF35499.6to $120 $4,21815674010ft
feet 2.0-3.0500.5 Cross Slope (PAR)SF107511.8to $120 $12,88215674110ft
feet 2.0-3.0526.3 Cross Slope (PAR)SF30529.5to $120 $3,64815674210ft
feet 4.0-5.0530.8 Cross Slope (PAR)SF107542.1to $120 $12,88215674310ft
feet 6.0-7.0544.1 Cross Slope (PAR)SF121556.8to $120 $14,47815674410ft
feet .44549.2 Vertical Change REF10550.2to137925 10 ft
feet 5.0-6.0556.8 Cross Slope (PAR)SF24559.3to $120 $2,85015674510ft
feet 3.0-4.0559.3 Cross Slope (PAR)SF62565.8to $120 $7,41015674610ft
feet 2.0-3.0565.8 Cross Slope (PAR)SF16567.5to $120 $1,93815674710ft
feet 3.0-4.0571.6 Cross Slope (PAR)SF23574.0to $120 $2,73615674810ft
feet 2.0-3.0574.0 Cross Slope (PAR)SF67581.1to $120 $8,09415674910ft
$306,346.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:S SUNOL DR
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
557
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001171034
Run ID
Bandini Blvd
106.25
ID Sidewalk Width
Priority
feet .262.2 Vertical Change LF93.2to $75 $71313823910ft
feet 2.0-3.06.8 Cross Slope (PAR)SF10517.8to $120 $12,54015853910ft
feet 1.2922.8 Vertical Change REF1023.8to138240 10 ft
feet 2.0-3.023.4 Cross Slope (PAR)SF1424.9to $120 $1,71015854010ft
feet 2.0-3.029.7 Cross Slope (PAR)SF1231.0to $120 $1,48215854110ft
feet 2.0-3.033.3 Cross Slope (PAR)SF6440.0to $120 $7,63815854210ft
feet .6247.8 Vertical Change SF1048.8to $75 $71313824110ft
feet 2.0-3.056.5 Cross Slope (PAR)SF3860.5to $120 $4,56015854310ft
feet 2.0-3.063.0 Cross Slope (PAR)SF6069.3to $120 $7,18215854410ft
feet 5.0-6.067.6 Running Slope REF1168.8to166628 10 ft
feet69.3 Driveway90.8to165983
feet 3.0-4.090.8 Cross Slope (Driveway)SF4095.0to $40 $1,59615854510ft
feet 5.0-6.095.0 Cross Slope (PAR)SF3698.8to $120 $4,33215854610ft
feet 3.0-4.098.8 Cross Slope (PAR)SF18100.7to $120 $2,16615854710ft
feet 2.0-3.0100.9 Cross Slope (PAR)SF106112.1to $120 $12,76815854810ft
feet 4.0-5.0112.7 Cross Slope (PAR)SF78120.9to $120 $9,34815854910ft
feet 2.0-3.0121.9 Cross Slope (PAR)SF25124.5to $120 $2,96415855010ft
feet 4.0-5.0131.8 Cross Slope (PAR)SF14133.3to $120 $1,71015855110ft
feet 2.0-3.0138.3 Cross Slope (PAR)SF12139.6to $120 $1,48215855210ft
feet 2.0-3.0142.3 Cross Slope (PAR)SF10143.4to $120 $1,25415855310ft
feet 4.0-5.0146.0 Cross Slope (PAR)SF28148.9to $120 $3,30615855410ft
feet .43146.7 Vertical Change REF10147.7to138242 10 ft
feet 2.0-3.0149.8 Cross Slope (PAR)SF237174.8to $120 $28,50015855510ft
feet 4.0-5.0174.8 Cross Slope (PAR)SF12176.1to $120 $1,48215855610ft
feet 2.0-3.0178.2 Cross Slope (PAR)SF10179.3to $120 $1,25415855710ft
feet 3.0-4.0181.7 Cross Slope (PAR)SF10182.8to $120 $1,25415855810ft
feet 2.34183.5 Vertical Change SF10184.5to $75 $71313824310ft
feet 2.0-3.0185.3 Cross Slope (PAR)SF89194.7to $120 $10,71615855910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
558
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001171034
Run ID
Bandini Blvd
106.25
ID Sidewalk Width
Priority
feet197.3 Driveway227.7to165984
feet .31227.3 Vertical Change REF10228.3to138244 10 ft
feet 4.0-5.0227.8 Cross Slope (Driveway)SF19229.8to $40 $76015856010ft
feet 2.0-3.0230.5 Cross Slope (PAR)SF73238.2to $120 $8,77815856110ft
feet 3.0-4.0242.2 Cross Slope (PAR)SF50247.5to $120 $6,04215856210ft
feet 2.0-3.0247.5 Cross Slope (PAR)SF16249.2to $120 $1,93815856310ft
feet 5.0-6.0248.0 Running Slope REF20250.1to166629 10 ft
feet250.3 Driveway283.8to165985
feet 2.0-3.0285.9 Cross Slope (PAR)SF64292.6to $120 $7,63815856410ft
feet 4.0-5.0292.6 Cross Slope (PAR)SF10293.7to $120 $1,25415856510ft
feet .37299.4 Vertical Change LF10300.4to $75 $71313824510ft
feet 2.0-3.0302.5 Cross Slope (PAR)SF108313.9to $120 $12,99615856610ft
feet 2.0-3.0319.2 Cross Slope (PAR)SF26321.9to $120 $3,07815856710ft
feet 4.0-5.0321.9 Cross Slope (PAR)SF21324.1to $120 $2,50815856810ft
feet 2.0-3.0326.4 Cross Slope (PAR)SF46331.2to $120 $5,47215856910ft
feet 5.0-6.0332.8 Cross Slope (PAR)SF21335.0to $120 $2,50815857010ft
feet 2.0-3.0336.8 Cross Slope (PAR)SF33340.3to $120 $3,99015857110ft
feet 2.0-3.0344.8 Cross Slope (PAR)SF100355.3to $120 $11,97015857210ft
feet 3.45352.4 Vertical Change REF10353.4to138246 10 ft
feet 2.0-3.0361.8 Cross Slope (PAR)SF47366.7to $120 $5,58615857310ft
feet 4.0-5.0367.0 Cross Slope (PAR)SF24369.5to $120 $2,85015857410ft
feet 3.0-4.0371.9 Cross Slope (PAR)SF21374.1to $120 $2,50815857510ft
feet374.3 Driveway406.5to165986
feet -.28385.9 Vertical Change REF10386.9to138247 10 ft
feet 2.0-3.0408.3 Cross Slope (PAR)SF34411.9to $120 $4,10415857610ft
feet413.5 Driveway436.3to165987
feet 2.0-3.0439.7 Cross Slope (PAR)SF79448.0to $120 $9,46215857710ft
feet 4.0-5.0448.4 Cross Slope (PAR)SF42452.8to $120 $5,01615857810ft
feet -.28455.6 Vertical Change LF10456.6to $75 $71313824810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
559
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001171034
Run ID
Bandini Blvd
106.25
ID Sidewalk Width
Priority
feet 3.0-4.0457.6 Cross Slope (PAR)SF18459.5to $120 $2,16615857910ft
feet 2.0-3.0461.8 Cross Slope (PAR)SF24464.3to $120 $2,85015858010ft
feet 3.0-4.0468.2 Cross Slope (PAR)SF76476.2to $120 $9,12015858110ft
feet .28474.8 Vertical Change REF10475.8to138249 10 ft
feet 2.0-3.0476.9 Cross Slope (PAR)SF37480.8to $120 $4,44615858210ft
feet 2.0-3.0484.8 Cross Slope (PAR)SF14486.3to $120 $1,71015858310ft
feet .35490.3 Vertical Change LF10491.3to $75 $71313825010ft
feet .28495.4 Vertical Change LF10496.4to $75 $71313825110ft
feet 2.0-3.0498.6 Cross Slope (PAR)SF26501.3to $120 $3,07815858410ft
feet 4.0-5.0504.7 Cross Slope (PAR)SF78512.9to $120 $9,34815858510ft
feet .89512.0 Vertical Change REF10513.0to138252 10 ft
feet 4.0-5.0516.5 Cross Slope (PAR)SF27519.3to $120 $3,19215858610ft
feet -.36519.3 Vertical Change REF10520.3to138253 10 ft
feet519.3 Driveway554.7to165988
feet 1.01554.7 Vertical Change REF10555.7to138254 10 ft
feet 4.0-5.0554.7 Cross Slope (Driveway)SF15556.3to $40 $60815858710ft
feet 4.0-5.0558.8 Cross Slope (PAR)SF79567.1to $120 $9,46215858810ft
feet 6.0-7.0568.1 Cross Slope (PAR)SF32571.5to $120 $3,87615858910ft
feet 4.0-5.0573.2 Cross Slope (PAR)SF35576.9to $120 $4,21815859010ft
feet 2.0-3.0579.1 Cross Slope (PAR)SF13580.5to $120 $1,59615859110ft
feet 4.0-5.0581.8 Cross Slope (PAR)SF49587.0to $120 $5,92815859210ft
feet .3584.1 Vertical Change REF10585.1to138255 10 ft
feet 2.0-3.0598.8 Cross Slope (PAR)SF40603.0to $120 $4,78815859310ft
feet 3.0-4.0605.2 Cross Slope (PAR)SF64611.9to $120 $7,63815859410ft
feet 2.0-3.0619.2 Cross Slope (PAR)SF17621.0to $120 $2,05215859510ft
feet 4.0-5.0621.4 Cross Slope (PAR)SF35625.1to $120 $4,21815859610ft
feet 2.0-3.0626.4 Cross Slope (PAR)SF10627.5to $120 $1,25415859710ft
feet 3.0-4.0629.8 Cross Slope (PAR)SF32633.2to $120 $3,87615859810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
560
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001171034
Run ID
Bandini Blvd
106.25
ID Sidewalk Width
Priority
feet 4.0-5.0636.0 Cross Slope (PAR)SF60642.3to $120 $7,18215859910ft
feet 3.0-4.0645.5 Cross Slope (PAR)SF18647.4to $120 $2,16615860010ft
feet 3.0-4.0653.5 Cross Slope (PAR)SF24656.0to $120 $2,85015860110ft
feet 2.0-3.0659.5 Cross Slope (PAR)SF23661.9to $120 $2,73615860210ft
feet 3.0-4.0680.1 Cross Slope (PAR)SF11681.3to $120 $1,36815860310ft
feet 2.0-3.0686.2 Cross Slope (PAR)SF10687.2to $120 $1,14015860410ft
feet 3.0-4.0702.5 Cross Slope (PAR)SF80710.9to $120 $9,57615860510ft
feet 2.0-3.0711.5 Cross Slope (PAR)SF18713.4to $120 $2,16615860610ft
feet 2.0-3.0715.8 Cross Slope (PAR)SF17717.6to $120 $2,05215860710ft
feet .75724.4 Vertical Change SF10725.4to $75 $71313825610ft
feet 2.0-3.0728.0 Cross Slope (PAR)SF51733.4to $120 $6,15615860810ft
feet 3.0-4.0735.6 Cross Slope (PAR)SF17737.4to $120 $2,05215860910ft
feet 4.0-5.0739.8 Cross Slope (PAR)SF10740.9to $120 $1,25415861010ft
feet 3.0-4.0743.1 Cross Slope (PAR)SF26745.8to $120 $3,07815861110ft
feet 2.0-3.0757.3 Cross Slope (PAR)SF34760.9to $120 $4,10415861210ft
feet 2.0-3.0766.2 Cross Slope (PAR)SF13767.6to $120 $1,59615861310ft
feet 2.0-3.0771.5 Cross Slope (PAR)SF11772.7to $120 $1,36815861410ft
feet 3.0-4.0774.8 Cross Slope (PAR)SF13776.2to $120 $1,59615861510ft
feet 2.0-3.0789.3 Cross Slope (PAR)SF47794.2to $120 $5,58615861610ft
feet 3.0-4.0798.8 Cross Slope (PAR)SF10799.8to $120 $1,14015861710ft
feet 2.0-3.0799.8 Cross Slope (PAR)SF10800.8to $120 $1,14015861810ft
feet 2.0-3.0803.7 Cross Slope (PAR)SF82812.3to $120 $9,80415861910ft
feet 2.0-3.0815.6 Cross Slope (PAR)SF20817.7to $120 $2,39415862010ft
feet 2.0-3.0826.2 Cross Slope (PAR)SF67833.3to $120 $8,09415862110ft
feet .65845.3 Vertical Change SF10846.3to $75 $71313825710ft
feet 4.0-5.0849.7 Cross Slope (PAR)SF10850.8to $120 $1,25415862210ft
feet 5.0-6.0853.1 Cross Slope (PAR)SF29856.2to $120 $3,53415862310ft
feet 3.0-4.0860.9 Cross Slope (PAR)SF31864.2to $120 $3,76215862410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
561
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
S SUNOL DR
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001171034
Run ID
Bandini Blvd
106.25
ID Sidewalk Width
Priority
feet 2.0-3.0865.8 Cross Slope (PAR)SF14867.3to $120 $1,71015862510ft
feet 3.0-4.0870.9 Cross Slope (PAR)SF151886.8to $120 $18,12615862610ft
feet 6.0-7.0888.8 Cross Slope (PAR)SF17890.6to $120 $2,05215862710ft
feet -.37890.0 Vertical Change REF10891.0to138258 10 ft
feet 4.0-5.0892.8 Cross Slope (PAR)SF39896.9to $120 $4,67415862810ft
feet 2.0-3.0899.2 Cross Slope (PAR)SF50904.5to $120 $6,04215862910ft
feet 4.0-5.0905.4 Cross Slope (PAR)SF67912.5to $120 $8,09415863010ft
feet 2.0-3.0914.6 Cross Slope (PAR)SF30917.8to $120 $3,64815863110ft
feet 4.0-5.0918.7 Cross Slope (PAR)SF93928.5to $120 $11,17215863210ft
feet 3.0-4.0936.8 Cross Slope (PAR)SF30940.0to $120 $3,64815863310ft
feet 5.0-6.0949.5 Cross Slope (PAR)SF11950.7to $120 $1,36815863410ft
feet 2.0-3.0959.3 Cross Slope (PAR)SF18961.2to $120 $2,16615863510ft
feet 2.0-3.0971.3 Cross Slope (PAR)SF266999.3to $120 $31,92015863610ft
feet 3.0-4.01002.7 Cross Slope (PAR)SF171004.5to $120 $2,05215863710ft
feet 2.0-3.01005.0 Cross Slope (PAR)SF481010.1to $120 $5,81415863810ft
feet 3.0-4.01015.8 Cross Slope (PAR)SF681023.0to $120 $8,20815863910ft
feet 4.0-5.01026.9 Cross Slope (PAR)SF511032.3to $120 $6,15615864010ft
feet 3.0-4.01035.4 Cross Slope (PAR)SF101036.5to $120 $1,25415864110ft
feet 2.0-3.01038.4 Cross Slope (PAR)SF371042.3to $120 $4,44615864210ft
feet 4.0-5.01043.8 Cross Slope (PAR)SF101044.9to $120 $1,25415864310ft
feet 2.0-3.01046.0 Cross Slope (PAR)SF1411060.8to $120 $16,87215864410ft
feet 5.0-6.01058.8 Running Slope REF141060.3to166630 10 ft
$539,362.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:S SUNOL DR
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
562
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001161625
Run ID
Bandini Blvd
74.5
ID Sidewalk Width
Priority
feet 7.0-8.00.3 Cross Slope (PAR)SF121.6to $120 $1,48215600010ft
feet 9.0-10.02.3 Cross Slope (PAR)SF10913.8to $120 $13,11015600110ft
feet 7.0-8.015.6 Cross Slope (PAR)SF1016.6to $120 $1,14015600210ft
feet 9.0-10.018.1 Cross Slope (PAR)SF2620.8to $120 $3,07815600310ft
feet 2.0-3.028.3 Cross Slope (PAR)SF2530.9to $120 $2,96415600410ft
feet 2.0-3.038.3 Cross Slope (PAR)SF1740.1to $120 $2,05215600510ft
feet 2.0-3.044.1 Cross Slope (PAR)SF1045.1to $120 $1,14015600610ft
feet 2.0-3.051.9 Cross Slope (PAR)SF1653.6to $120 $1,93815600710ft
feet 3.0-4.060.3 Cross Slope (PAR)SF1361.7to $120 $1,59615600810ft
feet62.2 Driveway88.8to165852
$28,500.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
563
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161642
Run ID
Bandini Blvd
96.25
ID Sidewalk Width
Priority
feet 8.0-9.01.7 Cross Slope (PAR)SF10512.8to $120 $12,65415591410ft
feet 3.0-4.016.9 Cross Slope (PAR)SF9827.2to $120 $11,74215591510ft
feet 3.0-4.029.3 Cross Slope (PAR)SF3633.1to $120 $4,33215591610ft
feet 1.8332.0 Vertical Change REF1033.0to137763 10 ft
feet 2.0-3.033.1 Cross Slope (PAR)SF1434.6to $120 $1,71015591710ft
feet 1.2936.3 Vertical Change SF1037.3to $75 $71313776410ft
feet 2.0-3.038.3 Cross Slope (PAR)SF5343.9to $120 $6,38415591810ft
feet 3.0-4.047.7 Cross Slope (PAR)SF1549.3to $120 $1,82415591910ft
feet 2.0-3.050.0 Cross Slope (PAR)SF2252.3to $120 $2,62215592010ft
feet 2.0-3.054.5 Cross Slope (PAR)SF1756.3to $120 $2,05215592110ft
feet 4.0-5.057.1 Cross Slope (PAR)SF15473.3to $120 $18,46815592210ft
feet 2.0-3.074.4 Cross Slope (PAR)SF6581.2to $120 $7,75215592310ft
feet 4.0-5.081.6 Cross Slope (PAR)SF3885.6to $120 $4,56015592410ft
feet 2.0-3.085.6 Cross Slope (PAR)SF1186.8to $120 $1,36815592510ft
feet 4.0-5.090.9 Cross Slope (PAR)SF2993.9to $120 $3,42015592610ft
feet 4.0-5.097.0 Cross Slope (PAR)SF31100.3to $120 $3,76215592710ft
feet 2.0-3.0106.0 Cross Slope (PAR)SF78114.2to $120 $9,34815592810ft
feet 3.0-4.0116.8 Cross Slope (PAR)SF43121.3to $120 $5,13015592910ft
feet 2.0-3.0121.9 Cross Slope (PAR)SF105133.0to $120 $12,65415593010ft
feet 2.0-3.0136.6 Cross Slope (PAR)SF97146.8to $120 $11,62815593110ft
feet 6.0-7.0138.5 Running Slope SF12139.8to $120 $1,48216654810ft
feet 2.0-3.0156.9 Cross Slope (PAR)SF23159.3to $120 $2,73615593210ft
feet 3.0-4.0161.4 Cross Slope (PAR)SF40165.6to $120 $4,78815593310ft
feet 2.0-3.0167.6 Cross Slope (PAR)SF125180.8to $120 $15,04815593410ft
feet 3.0-4.0183.8 Cross Slope (PAR)SF23186.2to $120 $2,73615593510ft
feet 2.0-3.0186.2 Cross Slope (PAR)SF29189.3to $120 $3,53415593610ft
feet190.4 Driveway208.8to165847
feet 2.0-3.0209.1 Cross Slope (Driveway)SF16210.8to $40 $64615593710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
564
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161642
Run ID
Bandini Blvd
96.25
ID Sidewalk Width
Priority
feet 4.0-5.0211.4 Cross Slope (PAR)SF97221.6to $120 $11,62815593810ft
feet 4.0-5.0223.8 Cross Slope (PAR)SF53229.4to $120 $6,38415593910ft
feet 2.0-3.0229.6 Cross Slope (PAR)SF78237.8to $120 $9,34815594010ft
feet 2.0-3.0248.8 Cross Slope (PAR)SF10249.9to $120 $1,25415594110ft
feet 2.0-3.0254.3 Cross Slope (PAR)SF67261.3to $120 $7,98015594210ft
feet 3.0-4.0266.8 Cross Slope (PAR)SF57272.8to $120 $6,84015594310ft
feet 2.0-3.0272.8 Cross Slope (PAR)SF200293.9to $120 $24,05415594410ft
feet -.26276.4 Vertical Change REF10277.4to137765 10 ft
feet 2.0-3.0302.7 Cross Slope (PAR)SF89312.1to $120 $10,71615594510ft
feet 2.0-3.0317.8 Cross Slope (PAR)SF10318.8to $120 $1,14015594610ft
feet 4.0-5.0320.4 Cross Slope (PAR)SF105331.5to $120 $12,65415594710ft
feet 2.0-3.0331.5 Cross Slope (PAR)SF10332.6to $120 $1,25415594810ft
feet 2.0-3.0339.1 Cross Slope (PAR)SF39343.2to $120 $4,67415594910ft
feet .28340.6 Vertical Change REF50345.9to137766 10 ft
feet 2.0-3.0346.5 Cross Slope (PAR)SF116358.7to $120 $13,90815595010ft
feet .61358.8 Vertical Change SF10359.8to $75 $71313776710ft
feet 3.0-4.0366.0 Cross Slope (PAR)SF38370.0to $120 $4,56015595110ft
feet 2.0-3.0370.0 Cross Slope (PAR)SF46374.8to $120 $5,47215595210ft
feet 2.0-3.0377.2 Cross Slope (PAR)SF22379.5to $120 $2,62215595310ft
feet 3.0-4.0383.8 Cross Slope (PAR)SF99394.2to $120 $11,85615595410ft
feet 2.0-3.0395.4 Cross Slope (PAR)SF10396.4to $120 $1,14015595510ft
feet .26397.2 Vertical Change LF10398.2to $75 $71313776810ft
feet 2.0-3.0402.4 Cross Slope (PAR)SF120415.0to $120 $14,36415595610ft
feet 2.0-3.0422.8 Cross Slope (PAR)SF45427.5to $120 $5,35815595710ft
feet 1.41427.2 Vertical Change REF10428.2to137769 10 ft
feet .42429.6 Vertical Change LF10430.6to $75 $71313777010ft
feet 2.0-3.0432.0 Cross Slope (PAR)SF22434.3to $120 $2,62215595810ft
feet -.28433.2 Vertical Change REF10434.2to137771 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
565
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161642
Run ID
Bandini Blvd
96.25
ID Sidewalk Width
Priority
feet 2.0-3.0442.3 Cross Slope (PAR)SF45447.0to $120 $5,35815595910ft
feet 3.0-4.0449.3 Cross Slope (PAR)SF170467.2to $120 $20,40615596010ft
feet 4.0-5.0471.3 Cross Slope (PAR)SF37475.2to $120 $4,44615596110ft
feet 3.0-4.0477.7 Cross Slope (PAR)SF70485.1to $120 $8,43615596210ft
feet 1.2484.1 Vertical Change REF10485.1to137772 10 ft
feet 5.0-6.0486.8 Cross Slope (PAR)SF102497.5to $120 $12,19815596310ft
feet 2.0-3.0498.4 Cross Slope (PAR)SF14499.9to $120 $1,71015596410ft
feet 2.0-3.0504.1 Cross Slope (PAR)SF143519.2to $120 $17,21415596510ft
feet 2.0-3.0523.0 Cross Slope (PAR)SF10524.1to $120 $1,25415596610ft
feet -.3526.6 Vertical Change REF10527.6to137773 10 ft
feet 2.0-3.0527.2 Cross Slope (PAR)SF21529.4to $120 $2,50815596710ft
feet 6.0-7.0527.4 Running Slope REF10528.4to166549 10 ft
feet 2.0-3.0537.3 Cross Slope (PAR)SF22539.6to $120 $2,62215596810ft
feet 2.0-3.0542.6 Cross Slope (PAR)SF58548.7to $120 $6,95415596910ft
feet 2.0-3.0550.8 Cross Slope (PAR)SF29553.8to $120 $3,42015597010ft
feet 2.0-3.0559.3 Cross Slope (PAR)SF67566.4to $120 $8,09415597110ft
feet 3.0-4.0569.3 Cross Slope (PAR)SF187589.0to $120 $22,45815597210ft
feet 2.0-3.0589.3 Cross Slope (PAR)SF104600.2to $120 $12,42615597310ft
feet 2.0-3.0604.8 Cross Slope (PAR)SF95614.8to $120 $11,40015597410ft
feet 2.0-3.0617.5 Cross Slope (PAR)SF12618.8to $120 $1,48215597510ft
feet621.2 Driveway640.8to165848
feet 5.0-6.0640.8 Cross Slope (Driveway)SF38644.8to $40 $1,52015597610ft
feet 4.0-5.0648.9 Cross Slope (PAR)SF132662.8to $120 $15,84615597710ft
feet 3.0-4.0665.3 Cross Slope (PAR)SF74673.1to $120 $8,89215597810ft
feet 3.0-4.0676.9 Cross Slope (PAR)SF42681.3to $120 $5,01615597910ft
feet 3.0-4.0684.5 Cross Slope (PAR)SF68691.7to $120 $8,20815598010ft
feet 2.0-3.0693.2 Cross Slope (PAR)SF166710.7to $120 $19,95015598110ft
feet 4.0-5.0712.3 Cross Slope (PAR)SF29715.3to $120 $3,42015598210ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
566
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3768 BANDINI BLVD
End Street Name
2001161642
Run ID
Bandini Blvd
96.25
ID Sidewalk Width
Priority
feet 2.0-3.0725.6 Cross Slope (PAR)SF43730.1to $120 $5,13015598310ft
feet 4.0-5.0731.5 Cross Slope (PAR)SF81740.0to $120 $9,69015598410ft
feet 2.0-3.0741.1 Cross Slope (PAR)SF187760.8to $120 $22,45815598510ft
feet -.34760.3 Vertical Change REF10761.3to137776 10 ft
feet 4.0-5.0761.3 Cross Slope (PAR)SF421805.6to $120 $50,50215598610ft
feet806.4 Driveway827.2to165849
feet 4.0-5.0827.2 Cross Slope (Driveway)SF76835.2to $40 $3,04015598710ft
feet 4.0-5.0840.8 Cross Slope (PAR)SF38844.8to $120 $4,56015598810ft
feet 4.0-5.0848.5 Cross Slope (PAR)SF11849.7to $120 $1,36815598910ft
feet 4.0-5.0857.2 Cross Slope (PAR)SF39861.3to $120 $4,67415599010ft
feet 5.0-6.0864.9 Cross Slope (PAR)SF12866.2to $120 $1,48215599110ft
feet 4.0-5.0869.0 Cross Slope (PAR)SF98879.3to $120 $11,74215599210ft
feet .38879.8 Vertical Change LF10880.8to $75 $71313777710ft
feet880.7 Driveway897.9to165850
feet 4.0-5.0897.9 Cross Slope (Driveway)SF171915.9to $40 $6,84015599310ft
feet -.3906.6 Vertical Change REF10907.6to137778 10 ft
feet 5.0-6.0918.8 Cross Slope (PAR)SF30922.0to $120 $3,64815599410ft
feet 3.0-4.0922.2 Cross Slope (PAR)SF147937.7to $120 $17,67015599510ft
feet 5.0-6.0938.3 Cross Slope (PAR)SF44942.9to $120 $5,24415599610ft
feet946.5 Driveway970.4to165851
feet 3.0-4.0970.4 Cross Slope (Driveway)SF197991.1to $40 $7,86615599710ft
feet 5.0-6.0991.1 Cross Slope (PAR)SF11992.3to $120 $1,36815599810ft
feet 6.0-7.0992.3 Cross Slope (PAR)SF16994.0to $120 $1,93815599910ft
$680,228.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
567
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
2939 BANDINI BLVD
End Street Name
2001151554
Run ID
Bandini Blvd
68
ID Sidewalk Width
Priority
feet 5.0-6.00.7 Cross Slope (PAR)SF82.5to $120 $9721541125ft
feet2.8 Continuous Width REF53.8to167319 5 ft
feet 3.0-4.05.5 Cross Slope (PAR)SF209.9to $120 $2,3761541135ft
feet14.0 Continuous Width SF515.0to $120 $5401669995ft
feet 3.0-4.015.3 Cross Slope (PAR)SF516.3to $120 $5401541145ft
feet 2.0-3.017.6 Cross Slope (PAR)SF1520.9to $120 $1,7821541155ft
feet42.5 Driveway77.0to165718
feet 3.0-4.079.0 Cross Slope (PAR)SF680.3to $120 $7021541165ft
feet 2.0-3.080.3 Cross Slope (PAR)SF1082.6to $120 $1,2421541175ft
feet 2.0-3.087.4 Cross Slope (PAR)SF1189.9to $120 $1,3501541185ft
feet 4.0-5.091.2 Cross Slope (PAR)SF53103.0to $120 $6,3721541195ft
feet .2791.4 Vertical Change REF592.4to137438 5 ft
feet 3.0-4.0109.5 Cross Slope (PAR)SF7111.1to $120 $8641541205ft
feet 2.0-3.0114.3 Cross Slope (PAR)SF26120.1to $120 $3,1321541215ft
feet 3.0-4.0122.4 Cross Slope (PAR)SF15125.7to $120 $1,7821541225ft
feet128.3 Driveway146.4to165719
feet163.9 Driveway197.1to165720
feet 4.0-5.0198.0 Cross Slope (PAR)SF14201.1to $120 $1,6741541235ft
feet 2.0-3.0207.3 Cross Slope (PAR)SF15210.7to $120 $1,8361541245ft
feet 3.0-4.0213.5 Cross Slope (PAR)SF42222.8to $120 $5,0221541255ft
feet 5.0-6.0224.4 Cross Slope (PAR)SF16227.9to $120 $1,8901541265ft
feet 2.0-3.0230.7 Cross Slope (PAR)SF11233.1to $120 $1,2961541275ft
feet 4.0-5.0233.1 Cross Slope (PAR)SF14236.3to $120 $1,7281541285ft
feet236.3 Driveway269.8to165721
feet 4.0-5.0271.6 Cross Slope (PAR)SF26277.3to $120 $3,0781541295ft
feet 4.0-5.0288.1 Cross Slope (PAR)SF25293.6to $120 $2,9701541305ft
feet 2.0-3.0301.3 Cross Slope (PAR)SF9303.3to $120 $1,0801541315ft
feet 2.0-3.0308.3 Cross Slope (PAR)SF18312.3to $120 $2,1601541325ft
feet 2.0-3.0316.0 Cross Slope (PAR)SF17319.8to $120 $2,0521541335ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
568
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
2939 BANDINI BLVD
End Street Name
2001151554
Run ID
Bandini Blvd
68
ID Sidewalk Width
Priority
feet 2.0-3.0325.2 Cross Slope (PAR)SF29331.6to $120 $3,4561541345ft
feet 4.0-5.0334.0 Cross Slope (PAR)SF49344.9to $120 $5,8861541355ft
feet -.58354.0 Vertical Change SF5355.0to $75 $3381374395ft
feet 3.0-4.0374.5 Cross Slope (PAR)SF45384.5to $120 $5,4001541365ft
feet 2.0-3.0385.3 Cross Slope (PAR)SF11387.8to $120 $1,3501541375ft
feet 3.0-4.0391.6 Cross Slope (PAR)SF18395.5to $120 $2,1061541385ft
feet 2.0-3.0396.4 Cross Slope (PAR)SF32403.6to $120 $3,8881541395ft
feet 2.0-3.0414.4 Cross Slope (PAR)SF6415.8to $120 $7561541405ft
feet 2.0-3.0418.9 Cross Slope (PAR)SF84437.5to $120 $10,0441541415ft
feet 4.0-5.0438.3 Cross Slope (PAR)SF45448.3to $120 $5,4001541425ft
feet 2.0-3.0453.6 Cross Slope (PAR)SF5454.6to $120 $5401541435ft
feet 3.0-4.0463.7 Cross Slope (PAR)SF16467.3to $120 $1,9441541445ft
feet 3.0-4.0469.6 Cross Slope (PAR)SF39478.2to $120 $4,6441541455ft
feet 2.0-3.0480.3 Cross Slope (PAR)SF9482.2to $120 $1,0261541465ft
feet 2.0-3.0485.8 Cross Slope (PAR)SF9487.8to $120 $1,0801541475ft
feet 2.0-3.0490.3 Cross Slope (PAR)SF17494.0to $120 $1,9981541485ft
feet 3.0-4.0497.2 Cross Slope (PAR)SF50508.3to $120 $5,9941541495ft
feet508.7 Driveway550.8to165722
feet 2.0-3.0550.9 Cross Slope (Driveway)SF66565.5to $40 $2,6281541505ft
feet 3.0-4.0568.2 Cross Slope (PAR)SF6569.6to $120 $7561541515ft
feet 2.0-3.0571.3 Cross Slope (PAR)SF5572.3to $120 $5401541525ft
feet 4.0-5.0577.3 Cross Slope (PAR)SF7578.8to $120 $8101541535ft
feet 3.0-4.0581.8 Cross Slope (PAR)SF9583.8to $120 $1,0801541545ft
feet 3.0-4.0586.5 Cross Slope (PAR)SF17590.3to $120 $2,0521541555ft
feet 2.0-3.0591.8 Cross Slope (PAR)SF17595.5to $120 $1,9981541565ft
feet 3.0-4.0598.0 Cross Slope (PAR)SF29604.4to $120 $3,4561541575ft
feet 5.0-6.0605.5 Cross Slope (PAR)SF35613.2to $120 $4,1581541585ft
feet 3.0-4.0614.0 Cross Slope (PAR)SF18617.9to $120 $2,1061541595ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
569
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
2939 BANDINI BLVD
End Street Name
2001151554
Run ID
Bandini Blvd
68
ID Sidewalk Width
Priority
feet 2.0-3.0625.1 Cross Slope (PAR)SF20629.6to $120 $2,4301541605ft
feet 3.0-4.0632.1 Cross Slope (PAR)SF36640.0to $120 $4,2661541615ft
feet 4.0-5.0645.5 Cross Slope (PAR)SF18649.6to $120 $2,2141541625ft
feet 2.0-3.0650.8 Cross Slope (PAR)SF7652.3to $120 $8101541635ft
feet 5.0-6.0654.8 Cross Slope (PAR)SF23660.0to $120 $2,8081541645ft
feet 3.0-4.0660.8 Cross Slope (PAR)SF5662.0to $120 $6481541655ft
feet 2.0-3.0662.0 Cross Slope (PAR)SF31668.9to $120 $3,7261541665ft
feet 4.0-5.0669.9 Cross Slope (PAR)SF38678.3to $120 $4,5361541675ft
feet 2.0-3.0681.9 Cross Slope (PAR)SF10684.2to $120 $1,2421541685ft
feet 5.0-6.0688.3 Cross Slope (PAR)SF28694.5to $120 $3,3481541695ft
feet 3.0-4.0695.6 Cross Slope (PAR)SF16699.2to $120 $1,9441541705ft
feet 2.0-3.0700.2 Cross Slope (PAR)SF7701.8to $120 $8641541715ft
feet 2.0-3.0726.0 Cross Slope (PAR)SF121752.8to $120 $14,4721541725ft
feet 3.0-4.0755.2 Cross Slope (PAR)SF8756.9to $120 $9181541735ft
feet 4.0-5.0761.9 Cross Slope (PAR)SF13764.7to $120 $1,5121541745ft
feet 4.0-5.0772.9 Cross Slope (PAR)SF78790.3to $120 $9,3961541755ft
feet790.3 Driveway815.8to165723
feet 3.0-4.0816.3 Cross Slope (Driveway)SF5817.3to $40 $1801541765ft
feet .31818.2 Vertical Change LF5819.2to $75 $3381374405ft
feet 2.0-3.0844.7 Cross Slope (PAR)SF16848.3to $120 $1,9441541775ft
feet 2.0-3.0858.3 Cross Slope (PAR)SF11860.8to $120 $1,3501541785ft
$180,819.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:SIERRA PINE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
570
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
3308 BANDINI BLVD
End Street Name
2001151246
Run ID
Bandini Blvd
85.25
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF334.4to $120 $3,9601550868ft
feet1.5 Continuous Width REF82.5to167001 8 ft
feet 2.0-3.05.3 Cross Slope (PAR)SF16727.6to $120 $20,0701550878ft
feet 1.3211.0 Vertical Change REF812.0to137614 8 ft
feet 2.0-3.033.3 Cross Slope (PAR)SF6842.3to $120 $8,1001550888ft
feet 5.0-6.045.8 Running Slope SF947.0to $120 $1,0801665288ft
feet48.3 Driveway92.6to165792
feet -.3480.2 Vertical Change REF881.2to137615 8 ft
feet 3.0-4.092.6 Cross Slope (Driveway)SF3997.8to $40 $1,5601550898ft
feet 2.0-3.097.8 Cross Slope (PAR)SF999.0to $120 $1,0801550908ft
feet 2.0-3.0106.8 Cross Slope (PAR)SF8107.8to $120 $9001550918ft
feet 4.0-5.0110.2 Cross Slope (PAR)SF56117.6to $120 $6,6601550928ft
feet .74119.7 Vertical Change SF8120.7to $75 $5631376168ft
feet 3.0-4.0123.4 Cross Slope (PAR)SF21126.2to $120 $2,5201550938ft
feet 2.0-3.0126.2 Cross Slope (PAR)SF42131.8to $120 $5,0401550948ft
feet 2.0-3.0138.6 Cross Slope (PAR)SF35143.3to $120 $4,2301550958ft
feet -1.41142.0 Vertical Change REF8143.0to137617 8 ft
feet143.6 Driveway165.0to165793
feet 2.0-3.0173.7 Cross Slope (PAR)SF105187.7to $120 $12,6001550968ft
feet 2.0-3.0189.9 Cross Slope (PAR)SF67198.8to $120 $8,0101550978ft
feet201.3 Driveway238.2to165794
feet 2.0-3.0242.6 Cross Slope (PAR)SF17244.9to $120 $2,0701550988ft
feet245.7 Driveway270.7to165795
feet 3.0-4.0271.0 Cross Slope (Driveway)SF8272.0to $40 $3001550998ft
feet 2.0-3.0273.1 Cross Slope (PAR)SF95285.8to $120 $11,4301551008ft
feet 2.0-3.0289.3 Cross Slope (PAR)SF32293.5to $120 $3,7801551018ft
feet 2.0-3.0300.8 Cross Slope (PAR)SF19303.3to $120 $2,2501551028ft
feet -.38305.8 Vertical Change LF8306.8to $75 $5631376188ft
feet 5.0-6.0316.9 Running Slope SF18319.3to $120 $2,1601665298ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
571
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
3308 BANDINI BLVD
End Street Name
2001151246
Run ID
Bandini Blvd
85.25
ID Sidewalk Width
Priority
feet319.6 Driveway361.8to165796
feet 3.0-4.0362.1 Cross Slope (Driveway)SF58369.8to $40 $2,3101551038ft
feet369.8 Driveway398.8to165797
feet 5.0-6.0405.3 Cross Slope (PAR)SF30409.3to $120 $3,6001551048ft
feet 6.0-7.0409.3 Cross Slope (PAR)SF22412.2to $120 $2,6101551058ft
feet 5.0-6.0412.2 Cross Slope (PAR)SF37417.1to $120 $4,4101551068ft
feet 4.0-5.0424.7 Cross Slope (PAR)SF44430.6to $120 $5,3101551078ft
feet 3.0-4.0442.9 Cross Slope (PAR)SF13444.6to $120 $1,5301551088ft
feet 2.0-3.0444.6 Cross Slope (PAR)SF9445.8to $120 $1,0801551098ft
feet 2.0-3.0448.3 Cross Slope (PAR)SF11449.7to $120 $1,2601551108ft
feet 2.0-3.0454.3 Cross Slope (PAR)SF20457.0to $120 $2,4301551118ft
feet457.0 Driveway487.7to165798
feet 2.0-3.0489.1 Cross Slope (PAR)SF17491.3to $120 $1,9801551128ft
feet 2.0-3.0495.2 Cross Slope (PAR)SF53502.3to $120 $6,3901551138ft
feet 4.0-5.0505.0 Cross Slope (PAR)SF72514.6to $120 $8,6401551148ft
feet 2.0-3.0515.3 Cross Slope (PAR)SF143534.3to $120 $17,1001551158ft
feet 3.0-4.0537.5 Cross Slope (PAR)SF97550.4to $120 $11,6101551168ft
feet 3.0-4.0552.7 Cross Slope (PAR)SF8553.8to $120 $9901551178ft
feet 2.0-3.0553.8 Cross Slope (PAR)SF69563.0to $120 $8,2801551188ft
feet 2.0-3.0567.9 Cross Slope (PAR)SF19570.4to $120 $2,2501551198ft
feet 2.0-3.0573.5 Cross Slope (PAR)SF8574.6to $120 $9901551208ft
feet575.3 Driveway600.8to165799
feet 3.0-4.0615.7 Cross Slope (PAR)SF8616.8to $120 $9901551218ft
feet 2.0-3.0617.2 Cross Slope (PAR)SF70626.6to $120 $8,4601551228ft
feet 4.0-5.0627.8 Cross Slope (PAR)SF53634.9to $120 $6,3901551238ft
feet 2.0-3.0636.8 Cross Slope (PAR)SF208664.5to $120 $24,9301551248ft
feet 4.0-5.0664.5 Cross Slope (PAR)SF46670.6to $120 $5,4901551258ft
feet .38671.7 Vertical Change LF8672.7to $75 $5631376198ft
feet 3.0-4.0673.4 Cross Slope (PAR)SF22676.3to $120 $2,6101551268ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
572
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
3308 BANDINI BLVD
End Street Name
2001151246
Run ID
Bandini Blvd
85.25
ID Sidewalk Width
Priority
feet 2.0-3.0676.3 Cross Slope (PAR)SF163698.0to $120 $19,5301551278ft
feet .33689.2 Vertical Change REF8690.2to137620 8 ft
feet 2.0-3.0700.9 Cross Slope (PAR)SF41706.3to $120 $4,8601551288ft
feet 2.0-3.0708.6 Cross Slope (PAR)SF12710.2to $120 $1,4401551298ft
feet 2.0-3.0718.0 Cross Slope (PAR)SF69727.2to $120 $8,2801551308ft
feet 4.0-5.0727.7 Cross Slope (PAR)SF38732.8to $120 $4,5901551318ft
feet 2.0-3.0734.7 Cross Slope (PAR)SF32739.0to $120 $3,8701551328ft
feet -.43741.2 Vertical Change LF8742.2to $75 $5631376218ft
feet 4.0-5.0742.8 Cross Slope (PAR)SF18745.2to $120 $2,1601551338ft
feet 5.0-6.0748.5 Running Slope SF25751.8to $120 $2,9701665308ft
feet751.8 Driveway787.0to165800
feet 2.0-3.0787.2 Cross Slope (Driveway)SF23790.3to $40 $9301551348ft
feet 4.0-5.0799.3 Cross Slope (PAR)SF9800.5to $120 $1,0801551358ft
feet .58800.6 Vertical Change SF8801.6to $75 $5631376228ft
feet 2.0-3.0802.4 Cross Slope (PAR)SF8803.4to $120 $9001551368ft
feet809.8 Driveway852.3to165801
feet -.37824.4 Vertical Change REF8825.4to137623 8 ft
feet .31828.8 Vertical Change REF8829.8to137624 8 ft
feet -.31835.2 Vertical Change REF8836.2to137625 8 ft
feet 2.74837.4 Vertical Change REF8838.4to137626 8 ft
feet 3.0-4.0853.7 Cross Slope (PAR)SF8854.8to $120 $9901551378ft
$283,852.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:SIERRA PINE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
573
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161330
Run ID
Bandini Blvd
89.25
ID Sidewalk Width
Priority
feet 3.0-4.00.6 Cross Slope (PAR)SF354.3to $120 $4,21815654910ft
feet 5.0-6.04.3 Cross Slope (PAR)SF135.7to $120 $1,59615655010ft
feet 6.0-7.05.7 Cross Slope (PAR)SF7713.8to $120 $9,23415655110ft
feet 8.0-9.016.0 Cross Slope (PAR)SF5321.6to $120 $6,38415655210ft
feet 3.0-4.028.9 Cross Slope (PAR)SF1330.3to $120 $1,59615655310ft
feet 2.0-3.030.3 Cross Slope (PAR)SF2032.4to $120 $2,39415655410ft
feet 3.0-4.036.8 Cross Slope (PAR)SF2839.7to $120 $3,30615655510ft
feet 2.0-3.039.7 Cross Slope (PAR)SF8849.0to $120 $10,60215655610ft
feet 2.0-3.051.3 Cross Slope (PAR)SF10462.2to $120 $12,42615655710ft
feet 2.0-3.071.8 Cross Slope (PAR)SF2974.8to $120 $3,42015655810ft
feet 2.0-3.080.8 Cross Slope (PAR)SF198101.6to $120 $23,71215655910ft
feet 3.0-4.0104.4 Cross Slope (PAR)SF13105.8to $120 $1,59615656010ft
feet 2.0-3.0106.1 Cross Slope (PAR)SF20108.2to $120 $2,39415656110ft
feet 2.0-3.0115.3 Cross Slope (PAR)SF32118.7to $120 $3,87615656210ft
feet 3.0-4.0124.1 Cross Slope (PAR)SF40128.3to $120 $4,78815656310ft
feet 2.0-3.0128.7 Cross Slope (PAR)SF28131.6to $120 $3,30615656410ft
feet 2.0-3.0134.8 Cross Slope (PAR)SF23137.2to $120 $2,73615656510ft
feet 3.0-4.0143.5 Cross Slope (PAR)SF12144.8to $120 $1,48215656610ft
feet 3.0-4.0148.5 Cross Slope (PAR)SF29151.6to $120 $3,53415656710ft
feet 2.0-3.0152.2 Cross Slope (PAR)SF22154.5to $120 $2,62215656810ft
feet160.7 Driveway188.4to165879
feet 2.0-3.0188.4 Cross Slope (Driveway)SF54194.1to $40 $2,16615656910ft
feet 4.0-5.0194.1 Cross Slope (PAR)SF40198.3to $120 $4,78815657010ft
feet .33198.4 Vertical Change LF10199.4to $75 $71313787910ft
feet 2.0-3.0205.3 Cross Slope (PAR)SF46210.1to $120 $5,47215657110ft
feet -.35207.1 Vertical Change REF10208.1to137880 10 ft
feet 3.0-4.0215.3 Cross Slope (PAR)SF13216.7to $120 $1,59615657210ft
feet 2.0-3.0216.7 Cross Slope (PAR)SF30219.9to $120 $3,64815657310ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
574
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161330
Run ID
Bandini Blvd
89.25
ID Sidewalk Width
Priority
feet 3.0-4.0222.0 Cross Slope (PAR)SF104232.9to $120 $12,42615657410ft
feet 2.0-3.0234.6 Cross Slope (PAR)SF22236.9to $120 $2,62215657510ft
feet 3.0-4.0239.3 Cross Slope (PAR)SF24241.8to $120 $2,85015657610ft
feet 2.0-3.0242.8 Cross Slope (PAR)SF228266.8to $120 $27,36015657710ft
feet 4.0-5.0266.8 Cross Slope (PAR)SF62273.3to $120 $7,41015657810ft
feet 4.0-5.0275.6 Cross Slope (PAR)SF116287.8to $120 $13,90815657910ft
feet288.6 Driveway349.4to165880
feet 2.0-3.0350.1 Cross Slope (PAR)SF20352.2to $120 $2,39415658010ft
feet .26353.9 Vertical Change LF10354.9to $75 $71313788110ft
feet 3.0-4.0356.3 Cross Slope (PAR)SF10357.3to $120 $1,14015658110ft
feet 2.0-3.0361.5 Cross Slope (PAR)SF48366.6to $120 $5,81415658210ft
feet 5.0-6.0367.5 Cross Slope (PAR)SF10368.5to $120 $1,14015658310ft
feet .64370.9 Vertical Change SF10371.9to $75 $71313788210ft
feet 2.0-3.0378.1 Cross Slope (PAR)SF136392.4to $120 $16,30215658410ft
feet .76383.9 Vertical Change REF10384.9to137883 10 ft
feet 2.31388.8 Vertical Change REF10389.8to137884 10 ft
feet 4.0-5.0393.7 Cross Slope (PAR)SF10394.8to $120 $1,25415658510ft
feet 3.0-4.0397.6 Cross Slope (PAR)SF76405.6to $120 $9,12015658610ft
feet 2.0-3.0407.3 Cross Slope (PAR)SF19409.3to $120 $2,28015658710ft
feet 2.0-3.0414.1 Cross Slope (PAR)SF29417.2to $120 $3,53415658810ft
feet 1.88415.4 Vertical Change REF10416.4to137885 10 ft
feet 4.0-5.0422.8 Cross Slope (PAR)SF10423.8to $120 $1,14015658910ft
feet 2.0-3.0429.2 Cross Slope (PAR)SF10430.2to $120 $1,14015659010ft
feet -.28439.4 Vertical Change LF10440.4to $75 $71313788610ft
feet 2.0-3.0443.0 Cross Slope (PAR)SF14444.5to $120 $1,71015659110ft
feet 2.0-3.0448.8 Cross Slope (PAR)SF126462.1to $120 $15,16215659210ft
feet 3.0-4.0464.4 Cross Slope (PAR)SF47469.3to $120 $5,58615659310ft
feet 3.0-4.0471.4 Cross Slope (PAR)SF36475.2to $120 $4,33215659410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
575
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161330
Run ID
Bandini Blvd
89.25
ID Sidewalk Width
Priority
feet 4.0-5.0479.0 Cross Slope (PAR)SF19481.0to $120 $2,28015659510ft
feet 2.0-3.0481.9 Cross Slope (PAR)SF57487.9to $120 $6,84015659610ft
feet .77489.6 Vertical Change SF10490.6to $75 $71313788710ft
feet 2.0-3.0492.0 Cross Slope (PAR)SF41496.3to $120 $4,90215659710ft
feet 5.0-6.0496.3 Running Slope REF13497.7to166560 10 ft
feet498.2 Driveway523.4to165881
feet 3.0-4.0523.4 Cross Slope (Driveway)SF83532.1to $40 $3,30615659810ft
feet .34531.9 Vertical Change REF32535.3to137890 10 ft
feet 8.0-9.0533.6 Cross Slope (PAR)SF10534.7to $120 $1,25415659910ft
feet 2.0-3.0538.8 Cross Slope (PAR)SF30542.0to $120 $3,64815660010ft
feet 2.0-3.0548.5 Cross Slope (PAR)SF10549.6to $120 $1,25415660110ft
feet .46560.2 Vertical Change LF10561.2to $75 $71313789110ft
feet569.3 Cold Patch 31572.6to140545 10 ft
feet .26570.2 Vertical Change LF10571.2to $75 $71313789210ft
feet 3.0-4.0572.6 Cross Slope (PAR)SF11573.8to $120 $1,36815660210ft
feet 2.0-3.0575.5 Cross Slope (PAR)SF17577.3to $120 $2,05215660310ft
feet 2.0-3.0579.5 Cross Slope (PAR)SF65586.3to $120 $7,75215660410ft
feet587.0 Driveway614.4to165882
feet -.27593.0 Vertical Change REF10594.0to137893 10 ft
feet615.3 Continuous Width SF10616.3to $120 $1,14016690310ft
feet 2.0-3.0617.1 Cross Slope (PAR)SF67624.1to $120 $7,98015660510ft
feet 4.0-5.0624.8 Cross Slope (PAR)SF22627.1to $120 $2,62215660610ft
feet 8.0-9.0629.5 Cross Slope (PAR)SF17631.3to $120 $2,05215660710ft
feet 4.0-5.0634.0 Cross Slope (PAR)SF10635.0to $120 $1,14015660810ft
feet638.8 Driveway661.3to165883
feet 8.0-9.0661.3 Cross Slope (Driveway)SF38665.3to $40 $1,52015660910ft
feet 3.0-4.0666.9 Cross Slope (PAR)SF19668.9to $120 $2,28015661010ft
feet 2.0-3.0669.1 Cross Slope (PAR)SF30672.3to $120 $3,64815661110ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
576
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161330
Run ID
Bandini Blvd
89.25
ID Sidewalk Width
Priority
feet 4.0-5.0675.6 Cross Slope (PAR)SF54681.3to $120 $6,49815661210ft
feet681.5 Continuous Width SF10682.5to $120 $1,14016690410ft
feet 6.0-7.0682.6 Cross Slope (PAR)SF21684.8to $120 $2,50815661310ft
feet 2.0-3.0687.0 Cross Slope (PAR)SF47691.9to $120 $5,58615661410ft
feet 2.0-3.0696.6 Cross Slope (PAR)SF54702.3to $120 $6,49815661510ft
feet 3.0-4.0705.2 Cross Slope (PAR)SF16706.9to $120 $1,93815661610ft
feet 2.0-3.0706.9 Cross Slope (PAR)SF79715.2to $120 $9,46215661710ft
feet 3.0-4.0718.1 Cross Slope (PAR)SF21720.3to $120 $2,50815661810ft
feet 3.0-4.0726.0 Cross Slope (PAR)SF36729.8to $120 $4,33215661910ft
feet730.5 Driveway771.1to165884
feet 2.0-3.0773.8 Cross Slope (PAR)SF29776.8to $120 $3,42015662010ft
feet 4.0-5.0777.7 Cross Slope (PAR)SF29780.8to $120 $3,53415662110ft
feet 2.0-3.0782.9 Cross Slope (PAR)SF18784.8to $120 $2,16615662210ft
feet 2.0-3.0786.9 Cross Slope (PAR)SF10788.0to $120 $1,25415662310ft
feet 2.0-3.0792.8 Cross Slope (PAR)SF41797.1to $120 $4,90215662410ft
feet 4.0-5.0798.3 Cross Slope (PAR)SF24800.8to $120 $2,85015662510ft
feet .35802.9 Vertical Change LF10803.9to $75 $71313789410ft
feet 2.0-3.0804.0 Cross Slope (PAR)SF18805.9to $120 $2,16615662610ft
feet -.45808.8 Vertical Change LF10809.8to $75 $71313789510ft
feet -.3815.4 Vertical Change LF10816.4to $75 $71313789710ft
feet .28819.7 Vertical Change REF10820.7to137898 10 ft
feet 2.0-3.0820.7 Cross Slope (PAR)SF13822.1to $120 $1,59615662710ft
feet 2.0-3.0824.9 Cross Slope (PAR)SF87834.1to $120 $10,48815662810ft
feet -.28828.6 Vertical Change REF10829.6to137899 10 ft
feet 3.0-4.0838.8 Cross Slope (PAR)SF29841.9to $120 $3,53415662910ft
feet842.9 Driveway869.7to165885
feet 3.0-4.0870.4 Cross Slope (Driveway)SF36874.2to $40 $1,44415663010ft
feet 2.0-3.0874.2 Cross Slope (PAR)SF115886.3to $120 $13,79415663110ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
577
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161330
Run ID
Bandini Blvd
89.25
ID Sidewalk Width
Priority
feet 4.0-5.0886.3 Cross Slope (PAR)SF28889.2to $120 $3,30615663210ft
feet 3.0-4.0892.2 Cross Slope (PAR)SF17894.0to $120 $2,05215663310ft
feet 2.0-3.0894.3 Cross Slope (PAR)SF45899.0to $120 $5,35815663410ft
feet .48897.7 Vertical Change REF10898.7to137900 10 ft
feet 4.0-5.0899.9 Cross Slope (PAR)SF71907.4to $120 $8,55015663510ft
feet907.6 Driveway931.0to165886
feet 3.0-4.0931.5 Cross Slope (PAR)SF74939.3to $120 $8,89215663610ft
feet 3.52937.2 Vertical Change REF10938.2to137901 10 ft
feet 3.0-4.0942.9 Cross Slope (PAR)SF121955.6to $120 $14,47815663710ft
feet .27952.4 Vertical Change REF10953.4to137902 10 ft
feet 2.0-3.0955.9 Cross Slope (PAR)SF89965.3to $120 $10,71615663810ft
feet 3.49965.4 Vertical Change REF10966.4to137903 10 ft
feet 4.0-5.0965.5 Cross Slope (PAR)SF40969.7to $120 $4,78815663910ft
feet970.5 Driveway996.1to165887
feet 1.07994.8 Vertical Change REF10995.8to137904 10 ft
feet 3.0-4.0998.2 Cross Slope (PAR)SF301001.4to $120 $3,64815664010ft
feet 6.0-7.01003.7 Cross Slope (PAR)SF271006.5to $120 $3,19215664110ft
feet 5.0-6.01006.5 Cross Slope (PAR)SF441011.1to $120 $5,24415664210ft
feet 3.0-4.01013.9 Cross Slope (PAR)SF2881044.2to $120 $34,54215664310ft
feet .531035.2 Vertical Change REF101036.2to137905 10 ft
feet 5.0-6.01044.2 Cross Slope (PAR)SF401048.4to $120 $4,78815664410ft
feet .441047.2 Vertical Change REF101048.2to137906 10 ft
feet 6.0-7.01051.1 Cross Slope (PAR)SF291054.1to $120 $3,42015664510ft
feet -.331051.7 Vertical Change REF101052.7to137907 10 ft
feet 9.0-10.01055.4 Cross Slope (PAR)SF101056.4to $120 $1,14015664610ft
feet 4.0-5.01063.6 Cross Slope (PAR)SF471068.5to $120 $5,58615664710ft
feet1068.8 Driveway1086.5to165888
feet 5.0-6.01086.5 Cross Slope (Driveway)SF2781115.8to $40 $11,13415664810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
578
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161330
Run ID
Bandini Blvd
89.25
ID Sidewalk Width
Priority
feet -.561104.0 Vertical Change REF101105.0to137908 10 ft
feet 3.0-4.01120.0 Cross Slope (PAR)SF341123.6to $120 $4,10415664910ft
feet 4.0-5.01125.7 Cross Slope (PAR)SF361129.5to $120 $4,33215665010ft
feet .361130.0 Vertical Change LF101131.0to $75 $71313790910ft
feet 2.0-3.01131.7 Cross Slope (PAR)SF481136.7to $120 $5,70015665110ft
feet 4.0-5.01136.7 Cross Slope (PAR)SF691144.0to $120 $8,32215665210ft
feet 3.0-4.01148.1 Cross Slope (PAR)SF721155.7to $120 $8,66415665310ft
feet 2.0-3.01158.7 Cross Slope (PAR)SF101159.8to $120 $1,25415665410ft
feet 2.0-3.01164.3 Cross Slope (PAR)SF1401179.0to $120 $16,75815665510ft
feet 3.221167.5 Vertical Change REF101168.5to137910 10 ft
feet 3.481181.3 Vertical Change SF101182.3to $75 $71313791110ft
feet 2.0-3.01183.5 Cross Slope (PAR)SF541189.2to $120 $6,49815665610ft
feet 3.0-4.01191.5 Cross Slope (PAR)SF121192.8to $120 $1,48215665710ft
feet 2.0-3.01192.8 Cross Slope (PAR)SF131194.2to $120 $1,59615665810ft
$608,266.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
579
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
2001161618
Run ID
Bandini Blvd
42
ID Sidewalk Width
Priority
feet 2.0-3.00.9 Cross Slope (PAR)SF101.9to $120 $1,14015600910ft
feet 2.0-3.04.2 Cross Slope (PAR)SF206.3to $120 $2,39415601010ft
$3,534.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
580
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
BONNIE BEACH PL
End Street Name
2001171110
Run ID
Bandini Blvd
66.25
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF828.6to $120 $9,80415835910ft
feet 6.0-7.09.4 Cross Slope (PAR)SF3212.8to $120 $3,87615836010ft
feet 5.0-6.013.0 Cross Slope (PAR)SF3716.9to $120 $4,44615836110ft
feet 3.0-4.017.8 Cross Slope (PAR)SF1419.3to $120 $1,71015836210ft
feet 2.0-3.024.9 Cross Slope (PAR)SF24650.8to $120 $29,52615836310ft
feet 3.0-4.056.9 Cross Slope (PAR)SF1858.8to $120 $2,16615836410ft
feet 2.0-3.060.3 Cross Slope (PAR)SF1061.4to $120 $1,25415836510ft
feet 2.0-3.069.0 Cross Slope (PAR)SF1971.0to $120 $2,28015836610ft
feet72.2 Driveway105.1to165971
feet 4.0-5.0111.1 Cross Slope (PAR)SF10112.2to $120 $1,25415836710ft
feet 2.0-3.0113.1 Cross Slope (PAR)SF54118.8to $120 $6,49815836810ft
feet .65113.7 Vertical Change REF10114.7to138205 10 ft
feet 4.0-5.0119.8 Cross Slope (PAR)SF12121.1to $120 $1,48215836910ft
feet 2.0-3.0127.4 Cross Slope (PAR)SF183146.7to $120 $22,00215837010ft
feet 2.0-3.0150.6 Cross Slope (PAR)SF24153.1to $120 $2,85015837110ft
feet 3.0-4.0155.6 Cross Slope (PAR)SF10156.7to $120 $1,25415837210ft
feet 2.0-3.0157.0 Cross Slope (PAR)SF122169.8to $120 $14,59215837310ft
feet 2.0-3.0172.6 Cross Slope (PAR)SF11173.8to $120 $1,36815837410ft
feet 2.0-3.0180.6 Cross Slope (PAR)SF107191.9to $120 $12,88215837510ft
feet 2.0-3.0196.3 Cross Slope (PAR)SF11197.5to $120 $1,36815837610ft
feet 2.0-3.0203.1 Cross Slope (PAR)SF80211.5to $120 $9,57615837710ft
feet 1.14220.5 Vertical Change SF10221.5to $75 $71313820610ft
feet .39222.6 Vertical Change LF10223.6to $75 $71313820710ft
feet 2.0-3.0229.4 Cross Slope (PAR)SF44234.0to $120 $5,24415837810ft
feet 2.0-3.0242.3 Cross Slope (PAR)SF159259.0to $120 $19,03815837910ft
feet 2.0-3.0271.8 Cross Slope (PAR)SF74279.6to $120 $8,89215838010ft
feet 3.0-4.0282.8 Cross Slope (PAR)SF23285.2to $120 $2,73615838110ft
feet 3.55294.2 Vertical Change SF10295.2to $75 $71313820810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
581
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
BONNIE BEACH PL
End Street Name
2001171110
Run ID
Bandini Blvd
66.25
ID Sidewalk Width
Priority
feet 2.0-3.0301.8 Cross Slope (PAR)SF251328.2to $120 $30,09615838210ft
feet .65319.0 Vertical Change REF10320.0to138209 10 ft
feet 2.0-3.0331.6 Cross Slope (PAR)SF10332.6to $120 $1,14015838310ft
feet 2.0-3.0341.4 Cross Slope (PAR)SF13342.8to $120 $1,59615838410ft
feet 4.0-5.0345.4 Cross Slope (PAR)SF53351.0to $120 $6,38415838510ft
feet 5.0-6.0349.1 Running Slope REF16350.8to166626 10 ft
feet 2.0-3.0353.0 Cross Slope (PAR)SF147368.5to $120 $17,67015838610ft
feet 3.0-4.0375.6 Cross Slope (PAR)SF16377.3to $120 $1,93815838710ft
feet 2.0-3.0383.4 Cross Slope (PAR)SF40387.6to $120 $4,78815838810ft
feet .44396.1 Vertical Change LF10397.1to $75 $71313821010ft
feet 4.0-5.0402.9 Cross Slope (PAR)SF36406.7to $120 $4,33215838910ft
feet 4.0-5.0408.8 Cross Slope (PAR)SF10409.8to $120 $1,14015839010ft
feet 2.0-3.0414.4 Cross Slope (PAR)SF16416.1to $120 $1,93815839110ft
feet 2.0-3.0423.8 Cross Slope (PAR)SF29426.8to $120 $3,42015839210ft
feet 2.0-3.0432.3 Cross Slope (PAR)SF112444.1to $120 $13,45215839310ft
feet 4.0-5.0451.1 Cross Slope (PAR)SF108462.5to $120 $12,99615839410ft
feet 1.03452.0 Vertical Change REF10453.0to138211 10 ft
feet 2.0-3.0463.3 Cross Slope (PAR)SF10464.4to $120 $1,25415839510ft
feet 4.0-5.0468.3 Cross Slope (PAR)SF74476.1to $120 $8,89215839610ft
feet 3.0-4.0478.3 Cross Slope (PAR)SF19480.3to $120 $2,28015839710ft
feet 2.0-3.0481.5 Cross Slope (PAR)SF67488.5to $120 $7,98015839810ft
feet 2.0-3.0491.2 Cross Slope (PAR)SF11492.4to $120 $1,36815839910ft
feet 3.0-4.0509.0 Cross Slope (PAR)SF24511.5to $120 $2,85015840010ft
feet 2.0-3.0514.3 Cross Slope (PAR)SF98524.6to $120 $11,74215840110ft
feet 4.0-5.0524.9 Cross Slope (PAR)SF38528.9to $120 $4,56015840210ft
feet 2.0-3.0529.1 Cross Slope (PAR)SF10530.1to $120 $1,14015840310ft
feet 3.0-4.0535.7 Cross Slope (PAR)SF10536.8to $120 $1,25415840410ft
feet 2.0-3.0537.8 Cross Slope (PAR)SF87547.0to $120 $10,48815840510ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
582
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
BONNIE BEACH PL
End Street Name
2001171110
Run ID
Bandini Blvd
66.25
ID Sidewalk Width
Priority
feet 4.0-5.0547.0 Cross Slope (PAR)SF74554.8to $120 $8,89215840610ft
feet 2.0-3.0555.1 Cross Slope (PAR)SF46559.9to $120 $5,47215840710ft
feet 2.0-3.0565.4 Cross Slope (PAR)SF12566.7to $120 $1,48215840810ft
feet 4.0-5.0572.8 Cross Slope (PAR)SF71580.3to $120 $8,55015840910ft
feet580.3 Driveway628.4to165972
feet .44590.4 Vertical Change REF10591.4to138212 10 ft
feet -.31604.0 Vertical Change REF10605.0to138213 10 ft
feet 3.0-4.0631.0 Cross Slope (PAR)SF55636.8to $120 $6,61215841010ft
feet 2.0-3.0636.8 Cross Slope (PAR)SF14638.3to $120 $1,71015841110ft
feet 3.0-4.0640.6 Cross Slope (PAR)SF57646.6to $120 $6,84015841210ft
feet 2.0-3.0648.5 Cross Slope (PAR)SF39652.6to $120 $4,67415841310ft
feet657.1 Cold Patch 29660.1to140560 10 ft
feet .47661.1 Vertical Change LF10662.1to $75 $71313821410ft
feet 2.0-3.0667.0 Cross Slope (PAR)SF58673.1to $120 $6,95415841410ft
feet 2.0-3.0689.6 Cross Slope (PAR)SF125702.8to $120 $15,04815841510ft
feet 3.0-4.0708.8 Cross Slope (PAR)SF11710.0to $120 $1,36815841610ft
feet 2.0-3.0710.0 Cross Slope (PAR)SF13711.4to $120 $1,59615841710ft
feet 2.0-3.0713.9 Cross Slope (PAR)SF23716.3to $120 $2,73615841810ft
feet 5.0-6.0728.9 Cross Slope (PAR)SF10730.0to $120 $1,25415841910ft
feet 3.0-4.0733.3 Cross Slope (PAR)SF19735.3to $120 $2,28015842010ft
feet 2.0-3.0736.6 Cross Slope (PAR)SF74744.4to $120 $8,89215842110ft
feet 3.0-4.0749.0 Cross Slope (PAR)SF16750.7to $120 $1,93815842210ft
feet 2.0-3.0751.2 Cross Slope (PAR)SF59757.4to $120 $7,06815842310ft
feet .3758.3 Vertical Change LF10759.3to $75 $71313821510ft
feet 2.0-3.0759.6 Cross Slope (PAR)SF29762.6to $120 $3,42015842410ft
feet 3.3765.0 Vertical Change SF10766.0to $75 $71313821610ft
feet 2.0-3.0767.3 Cross Slope (PAR)SF57773.3to $120 $6,84015842510ft
feet 3.0-4.0780.8 Cross Slope (PAR)SF32784.2to $120 $3,87615842610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
583
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S BANDINI BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
BONNIE BEACH PL
End Street Name
2001171110
Run ID
Bandini Blvd
66.25
ID Sidewalk Width
Priority
feet 2.0-3.0785.0 Cross Slope (PAR)SF17786.8to $120 $2,05215842710ft
feet 4.0-5.0796.8 Cross Slope (PAR)SF71804.3to $120 $8,55015842810ft
feet 2.0-3.0804.5 Cross Slope (PAR)SF45809.2to $120 $5,35815842910ft
feet 3.0-4.0816.9 Cross Slope (PAR)SF18818.8to $120 $2,16615843010ft
feet 2.0-3.0819.3 Cross Slope (PAR)SF145834.6to $120 $17,44215843110ft
feet 5.0-6.0837.2 Cross Slope (PAR)SF12838.5to $120 $1,48215843210ft
feet 3.0-4.0840.2 Cross Slope (PAR)SF82848.8to $120 $9,80415843310ft
feet 5.0-6.0849.0 Cross Slope (PAR)SF46853.8to $120 $5,47215843410ft
feet 4.0-5.0857.7 Cross Slope (PAR)SF12859.0to $120 $1,48215843510ft
feet 3.0-4.0861.3 Cross Slope (PAR)SF22863.6to $120 $2,62215843610ft
feet 2.0-3.0868.9 Cross Slope (PAR)SF43873.4to $120 $5,13015843710ft
feet 2.0-3.0877.3 Cross Slope (PAR)SF44881.9to $120 $5,24415843810ft
feet882.9 Driveway924.8to165973
feet 2.99918.8 Vertical Change REF10919.8to138217 10 ft
feet 4.0-5.0924.8 Cross Slope (Driveway)SF41929.1to $40 $1,63415843910ft
feet 2.0-3.0929.4 Cross Slope (PAR)SF13930.8to $120 $1,59615844010ft
feet 3.0-4.0933.1 Cross Slope (PAR)SF11934.3to $120 $1,36815844110ft
feet936.7 Driveway975.1to165974
feet936.7 Driveway977.8to165975
feet 2.0-3.0975.8 Cross Slope (Driveway)SF19977.8to $40 $76015844210ft
feet -.3976.0 Vertical Change REF10977.0to138218 10 ft
$505,447.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
584
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N BANDINI BLVD
Street Side
TRAIN CROSSING BEFORE
S DOWNEY RD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001161617
Run ID
Bandini Blvd
53.25
ID Sidewalk Width
Priority
feet 3.0-4.00.2 Cross Slope (PAR)SF485.3to $120 $5,81415601110ft
feet 5.0-6.01.4 Running Slope REF173.2to166550 10 ft
feet 2.0-3.06.3 Cross Slope (PAR)SF299.4to $120 $3,53415601210ft
feet 2.0-3.012.9 Cross Slope (PAR)SF9422.8to $120 $11,28615601310ft
$20,634.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:TRAIN CROSSING BEFORE S
DOWNEY RD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
585
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E BICKETT ST
Street Side
CITY BOUNDARY
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912131019
Run ID
Bickett St
54
ID Sidewalk Width
Priority
feet .490.5 Vertical Change REF81.5to135646 8 ft
feet 3.0-4.01.4 Cross Slope (PAR)SF467.5to $120 $5,4901471408ft
feet 2.0-3.07.5 Cross Slope (PAR)SF2911.4to $120 $3,5101471418ft
feet 4.0-5.011.4 Cross Slope (PAR)SF6820.5to $120 $8,1901471428ft
feet -.2712.1 Vertical Change REF813.1to135648 8 ft
feet 1.0116.0 Vertical Change REF817.0to135649 8 ft
feet 2.0-3.020.7 Cross Slope (PAR)SF10034.0to $120 $11,9701471438ft
feet 2.0-3.040.0 Cross Slope (PAR)SF6348.4to $120 $7,5601471448ft
feet -.2746.6 Vertical Change REF847.6to135650 8 ft
feet 3.0-4.050.8 Cross Slope (PAR)SF1652.9to $120 $1,8901471458ft
feet 2.0-3.054.0 Cross Slope (PAR)SF13471.8to $120 $16,0201471468ft
feet 1.0255.4 Vertical Change REF856.4to135651 8 ft
feet .3166.1 Vertical Change REF867.1to135652 8 ft
feet .5570.8 Vertical Change REF871.8to135653 8 ft
feet 4.0-5.071.8 Cross Slope (PAR)SF4577.8to $120 $5,4001471478ft
feet .2975.2 Vertical Change REF876.2to135654 8 ft
feet 2.0-3.077.8 Cross Slope (PAR)SF2781.4to $120 $3,2401471488ft
feet .6477.9 Vertical Change REF4283.5to135655 8 ft
feet 4.0-5.081.9 Cross Slope (PAR)SF10295.5to $120 $12,2401471498ft
feet 1.0984.2 Vertical Change SF885.2to $75 $5631356568ft
feet .6486.7 Vertical Change REF887.7to135657 8 ft
feet -.6389.8 Vertical Change REF2092.5to135658 8 ft
feet .5694.7 Vertical Change REF2397.8to135659 8 ft
feet 2.0-3.095.5 Cross Slope (PAR)SF195121.5to $120 $23,4001471508ft
feet 1.31113.8 Vertical Change REF8114.8to135660 8 ft
feet .6118.3 Vertical Change REF8119.3to135661 8 ft
feet 4.0-5.0122.1 Cross Slope (PAR)SF11123.6to $120 $1,3501471518ft
feet 3.0-4.0127.2 Cross Slope (PAR)SF15129.2to $120 $1,8001471528ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
586
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E BICKETT ST
Street Side
CITY BOUNDARY
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912131019
Run ID
Bickett St
54
ID Sidewalk Width
Priority
feet 2.0-3.0129.8 Cross Slope (PAR)SF106144.0to $120 $12,7801471538ft
feet 4.0-5.0144.6 Cross Slope (PAR)SF23147.7to $120 $2,7901471548ft
feet 2.0-3.0148.2 Cross Slope (PAR)SF116163.7to $120 $13,9501471558ft
feet165.8 Driveway207.1to165080
feet 4.0-5.0208.6 Cross Slope (PAR)SF43214.3to $120 $5,1301471568ft
feet214.3 Driveway258.5to165081
feet 2.0-3.0259.3 Cross Slope (PAR)SF60267.3to $120 $7,2001471578ft
feet 4.0-5.0267.8 Cross Slope (PAR)SF60275.8to $120 $7,2001471588ft
feet 3.0-4.0277.9 Cross Slope (PAR)SF35282.5to $120 $4,1401471598ft
feet 2.0-3.0283.3 Cross Slope (PAR)SF77293.6to $120 $9,2701471608ft
feet 3.0-4.0296.5 Cross Slope (PAR)SF9297.7to $120 $1,0801471618ft
feet 2.0-3.0297.9 Cross Slope (PAR)SF39303.1to $120 $4,6801471628ft
feet 2.68299.4 Vertical Change REF8300.4to135662 8 ft
feet 4.0-5.0303.6 Cross Slope (PAR)SF31307.7to $120 $3,6901471638ft
feet 2.0-3.0308.1 Cross Slope (PAR)SF39313.3to $120 $4,6801471648ft
feet 2.0-3.0317.7 Cross Slope (PAR)SF64326.2to $120 $7,6501471658ft
feet 3.0-4.0329.3 Cross Slope (PAR)SF72338.9to $120 $8,6401471668ft
feet 2.0-3.0338.9 Cross Slope (PAR)SF104352.8to $120 $12,5101471678ft
feet352.8 Driveway377.0to165082
feet352.8 Driveway385.3to165083
feet .96371.3 Vertical Change REF8372.3to135663 8 ft
feet .75379.0 Vertical Change REF8380.0to135664 8 ft
$208,012.50TOTAL COST FOR:BICKETT STEside of Starting at:CITY BOUNDARY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
587
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W BICKETT ST
Street Side
E 54TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912131403
Run ID
Bickett St
52.5
ID Sidewalk Width
Priority
feet 7.0-8.00.0 Cross Slope (PAR)SF173.3to $120 $1,9801466875ft
feet 5.0-6.04.2 Cross Slope (PAR)SF3010.1to $120 $3,5401466885ft
feet 3.0-4.010.8 Cross Slope (PAR)SF465103.8to $120 $55,8001466895ft
feet14.1 Continuous Width REF515.1to167191 5 ft
feet59.8 Continuous Width SF560.8to $120 $6001671505ft
feet104.6 Continuous Width SF5105.6to $120 $6001671515ft
feet 4.0-5.0108.5 Cross Slope (PAR)SF29114.3to $120 $3,4801466905ft
feet 2.0-3.0117.3 Cross Slope (PAR)SF10119.3to $120 $1,2001466915ft
feet121.9 Driveway149.6to165042
feet .37125.5 Vertical Change REF5126.5to135495 5 ft
feet -.27138.2 Vertical Change REF5139.2to135496 5 ft
feet 4.0-5.0151.1 Cross Slope (PAR)SF44159.9to $120 $5,2801466925ft
feet 4.0-5.0163.1 Cross Slope (PAR)SF180199.1to $120 $21,6001466935ft
feet 2.0-3.0200.4 Cross Slope (PAR)SF87217.8to $120 $10,4401466945ft
feet 2.0-3.0221.3 Cross Slope (PAR)SF25226.3to $120 $3,0001466955ft
feet225.3 Continuous Width SF5226.3to $120 $6001671525ft
feet 2.0-3.0228.8 Cross Slope (PAR)SF22233.1to $120 $2,5801466965ft
feet230.3 Continuous Width SF5231.3to $120 $6001673785ft
feet 4.0-5.0234.2 Cross Slope (PAR)SF55245.2to $120 $6,6001466975ft
feet 2.0-3.0245.3 Cross Slope (PAR)SF9247.0to $120 $1,0201466985ft
$118,920.00TOTAL COST FOR:BICKETT STWside of Starting at:E 54TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
588
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E BICKETT ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 54TH ST
End Street Name
1912131030
Run ID
Bickett St
63
ID Sidewalk Width
Priority
feet 3.0-4.00.7 Cross Slope (PAR)SF215.4to $120 $2,5381471155ft
feet 5.0-6.08.8 Cross Slope (PAR)SF59.8to $120 $5401471165ft
feet 6.0-7.09.8 Cross Slope (PAR)SF611.1to $120 $7021471175ft
feet 5.0-6.012.0 Cross Slope (PAR)SF1515.4to $120 $1,8361471185ft
feet14.6 Continuous Width SF515.6to $120 $5401674695ft
feet16.0 Cold Patch 1419.0to140325 5 ft
feet .2616.7 Vertical Change LF517.7to $75 $3381356415ft
feet 4.0-5.019.4 Cross Slope (PAR)SF3627.3to $120 $4,2661471195ft
feet 2.0-3.028.8 Cross Slope (PAR)SF2033.2to $120 $2,3761471205ft
feet31.8 Continuous Width REF432.8to167213 5 ft
feet 4.0-5.034.4 Cross Slope (PAR)SF9956.3to $120 $11,8261471215ft
feet 2.0-3.056.3 Cross Slope (PAR)SF3564.1to $120 $4,2121471225ft
feet60.2 Continuous Width SF561.2to $120 $5401668275ft
feet -.3465.9 Vertical Change LF566.9to $75 $3381356425ft
feet 2.0-3.071.0 Cross Slope (PAR)SF2576.5to $120 $2,9701471235ft
feet79.6 Continuous Width SF580.6to $120 $5401669195ft
feet 2.0-3.081.8 Cross Slope (PAR)SF1685.3to $120 $1,8901471245ft
feet 4.0-5.086.3 Cross Slope (PAR)SF1589.7to $120 $1,8361471255ft
feet90.0 Cold Patch 1893.9to140326 5 ft
feet 6.0-7.095.0 Cross Slope (PAR)SF696.4to $120 $7561471265ft
feet 5.0-6.097.1 Cross Slope (PAR)SF46107.3to $120 $5,5081471275ft
feet 4.0-5.0109.9 Cross Slope (PAR)SF94130.8to $120 $11,2861471285ft
feet117.3 Continuous Width REF5118.3to167242 5 ft
feet 4.0-5.0135.4 Cross Slope (PAR)SF95156.4to $120 $11,3401471295ft
feet .39157.3 Vertical Change LF5158.3to $75 $3381356445ft
feet 5.0-6.0158.5 Cross Slope (PAR)SF37166.7to $120 $4,4281471305ft
feet 3.0-4.0166.8 Cross Slope (PAR)SF31173.6to $120 $3,6721471315ft
feet 5.0-6.0173.9 Cross Slope (PAR)SF68188.9to $120 $8,1001471325ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
589
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E BICKETT ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 54TH ST
End Street Name
1912131030
Run ID
Bickett St
63
ID Sidewalk Width
Priority
feet 3.0-4.0188.9 Cross Slope (PAR)SF58201.7to $120 $6,9121471335ft
feet 4.0-5.0203.9 Cross Slope (PAR)SF42213.3to $120 $5,0761471345ft
feet209.3 Continuous Width REF5210.3to167192 5 ft
feet 2.0-3.0214.3 Cross Slope (PAR)SF54226.2to $120 $6,4261471355ft
feet218.8 Continuous Width REF5219.8to167735 5 ft
feet 4.0-5.0226.2 Cross Slope (PAR)SF18230.3to $120 $2,2141471365ft
feet230.3 Cold Patch 12232.9to140327 5 ft
feet232.3 Continuous Width SF5233.3to $120 $5401669255ft
feet .28232.4 Vertical Change LF5233.4to $75 $3381356455ft
feet 3.0-4.0233.9 Cross Slope (PAR)SF6235.3to $120 $7561471375ft
feet234.6 Continuous Width SF5235.6to $120 $5401669265ft
feet 6.0-7.0237.6 Cross Slope (PAR)SF32244.6to $120 $3,7801471385ft
feet 5.0-6.0244.8 Cross Slope (PAR)SF5245.8to $120 $5401471395ft
$109,836.00TOTAL COST FOR:BICKETT STEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
590
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W BICKETT ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
5715 BICKETT ST
End Street Name
1912131409
Run ID
Bickett St
35.25
ID Sidewalk Width
Priority
feet1.0 Driveway24.9to165040
feet 2.0-3.025.0 Cross Slope (Driveway)SF4030.0to $40 $1,6001466738ft
feet34.2 Driveway75.0to165041
feet .2837.0 Vertical Change REF838.0to135486 8 ft
feet .2862.2 Vertical Change REF863.2to135487 8 ft
feet 2.0-3.089.0 Cross Slope (PAR)SF8799.9to $120 $10,4641466748ft
feet 2.0-3.0103.7 Cross Slope (PAR)SF48109.7to $120 $5,7601466758ft
feet -.3112.1 Vertical Change LF8113.1to $75 $6001354888ft
feet 2.0-3.0116.9 Cross Slope (PAR)SF518181.7to $120 $62,2081466768ft
feet 2.0-3.0185.4 Cross Slope (PAR)SF311224.3to $120 $37,3441466778ft
feet 2.0-3.0229.3 Cross Slope (PAR)SF356273.8to $120 $42,7201466788ft
feet 2.0-3.0276.2 Cross Slope (PAR)SF28279.7to $120 $3,3601466798ft
feet 2.0-3.0287.2 Cross Slope (PAR)SF342329.9to $120 $40,9921466808ft
feet .26328.3 Vertical Change REF8329.3to135489 8 ft
feet 3.0-4.0338.6 Cross Slope (PAR)SF16340.6to $120 $1,9201466818ft
feet 2.0-3.0340.6 Cross Slope (PAR)SF10341.9to $120 $1,2481466828ft
feet 2.0-3.0347.4 Cross Slope (PAR)SF22350.1to $120 $2,5921466838ft
feet 2.0-3.0353.5 Cross Slope (PAR)SF9354.6to $120 $1,0561466848ft
feet 2.0-3.0357.8 Cross Slope (PAR)SF127373.7to $120 $15,2641466858ft
feet .26364.3 Vertical Change REF23367.2to135490 8 ft
feet 5.0-6.0369.4 Running Slope REF29373.0to166458 8 ft
feet .54370.1 Vertical Change REF8371.1to135491 8 ft
feet .47373.4 Vertical Change REF28376.9to135492 8 ft
feet 2.0-3.0377.4 Cross Slope (PAR)SF106390.6to $120 $12,6721466868ft
feet .29380.7 Vertical Change REF8381.7to135493 8 ft
feet -.32394.1 Vertical Change LF8395.1to $75 $6001354948ft
$240,400.00TOTAL COST FOR:BICKETT STWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
591
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S CHAMBERS ST
Street Side
HAMPTON ST
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912051057
Run ID
Chambers St
71.75
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF7910.5to $120 $9,4501622378ft
feet 2.0-3.012.3 Cross Slope (PAR)SF2515.6to $120 $2,9701622388ft
feet .2712.9 Vertical Change REF813.9to139594 8 ft
feet 4.0-5.015.6 Cross Slope (PAR)SF13433.4to $120 $16,0201622398ft
feet 2.0-3.033.4 Cross Slope (PAR)SF30273.7to $120 $36,2701622408ft
feet .3141.1 Vertical Change REF842.1to139595 8 ft
feet 2.0-3.082.3 Cross Slope (PAR)SF8793.9to $120 $10,4401622418ft
feet93.9 Driveway116.8to166276
feet93.9 Driveway147.4to166277
feet 3.0-4.0117.4 Cross Slope (Driveway)SF54124.6to $40 $2,1601622428ft
feet 5.0-6.0124.6 Cross Slope (Driveway)SF37129.5to $40 $1,4701622438ft
feet 3.0-4.0130.4 Cross Slope (Driveway)SF52137.3to $40 $2,0701622448ft
feet -.57131.2 Vertical Change REF8132.2to139596 8 ft
feet 2.0-3.0137.3 Cross Slope (Driveway)SF14139.2to $40 $5701622458ft
feet 5.0-6.0145.9 Running Slope REF11147.3to166649 8 ft
$81,420.00TOTAL COST FOR:CHAMBERS STSside of Starting at:HAMPTON ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
592
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N CHAMBERS ST
Street Side
PACIFIC BLVD
Survey Street Name Starting Street Name
HAMPTON ST
End Street Name
1912050930
Run ID
Chambers St
88.5
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF233.0to $120 $2,7001625358ft
feet 2.0-3.06.4 Cross Slope (PAR)SF2910.3to $120 $3,5101625368ft
feet 4.0-5.010.3 Cross Slope (PAR)SF12827.3to $120 $15,3001625378ft
feet 4.0-5.031.2 Cross Slope (PAR)SF4336.9to $120 $5,1301625388ft
feet 2.0-3.038.3 Cross Slope (PAR)SF5545.6to $120 $6,5701625398ft
feet .6848.8 Vertical Change REF849.8to139736 8 ft
feet 2.0-3.049.7 Cross Slope (PAR)SF3254.0to $120 $3,8701625408ft
feet 4.0-5.055.7 Cross Slope (PAR)SF2158.5to $120 $2,5201625418ft
feet 2.0-3.058.5 Cross Slope (PAR)SF5265.4to $120 $6,2101625428ft
feet 2.0-3.068.1 Cross Slope (PAR)SF3372.5to $120 $3,9601625438ft
feet 4.0-5.072.5 Cross Slope (PAR)SF873.5to $120 $9001625448ft
feet 4.0-5.076.3 Cross Slope (PAR)SF2479.5to $120 $2,8801625458ft
feet 2.0-3.083.7 Cross Slope (PAR)SF282121.3to $120 $33,8401625468ft
feet -.394.1 Vertical Change REF895.1to139738 8 ft
feet 3.0-4.0124.5 Cross Slope (PAR)SF45130.5to $120 $5,4001625478ft
feet 2.0-3.0131.8 Cross Slope (PAR)SF10133.2to $120 $1,2601625488ft
feet 4.0-5.0135.5 Cross Slope (PAR)SF29139.3to $120 $3,4201625498ft
feet 2.0-3.0139.3 Cross Slope (PAR)SF9140.5to $120 $1,0801625508ft
feet .26141.7 Vertical Change LF8142.7to $75 $5631397398ft
feet 2.0-3.0152.3 Cross Slope (PAR)SF49158.9to $120 $5,9401625518ft
feet .3156.7 Vertical Change REF8157.7to139740 8 ft
feet 5.0-6.0160.3 Cross Slope (PAR)SF31164.5to $120 $3,7801625528ft
feet -.4161.3 Vertical Change REF8162.3to139741 8 ft
feet .37163.2 Vertical Change REF8164.2to139742 8 ft
feet166.1 Driveway200.8to166309
feet .4167.0 Vertical Change REF8168.0to139743 8 ft
feet -.27188.9 Vertical Change REF8189.9to139744 8 ft
feet202.3 Driveway255.9to166310
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
593
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N CHAMBERS ST
Street Side
PACIFIC BLVD
Survey Street Name Starting Street Name
HAMPTON ST
End Street Name
1912050930
Run ID
Chambers St
88.5
ID Sidewalk Width
Priority
feet202.3 Driveway402.1to166311
feet .81214.9 Vertical Change REF8215.9to139745 8 ft
feet -.41222.2 Vertical Change REF8223.2to139746 8 ft
feet 2.0-3.0256.0 Cross Slope (Driveway)SF115271.3to $40 $4,5901625538ft
feet 4.0-5.0271.3 Cross Slope (Driveway)SF23274.3to $40 $9001625548ft
feet .26280.8 Vertical Change REF8281.8to139747 8 ft
feet 2.0-3.0281.9 Cross Slope (Driveway)SF80292.6to $40 $3,2101625558ft
feet 3.0-4.0296.5 Cross Slope (Driveway)SF43302.2to $40 $1,7101625568ft
feet 3.0-4.0305.2 Cross Slope (Driveway)SF68314.3to $40 $2,7301625578ft
feet 2.0-3.0314.5 Cross Slope (Driveway)SF17316.7to $40 $6601625588ft
feet 2.0-3.0323.2 Cross Slope (Driveway)SF14325.1to $40 $5701625598ft
feet 4.0-5.0325.8 Cross Slope (Driveway)SF20328.5to $40 $8101625608ft
feet 2.0-3.0330.7 Cross Slope (Driveway)SF53337.8to $40 $2,1301625618ft
feet 2.0-3.0343.8 Cross Slope (Driveway)SF11345.3to $40 $4501625628ft
feet 4.0-5.0346.4 Cross Slope (Driveway)SF22349.3to $40 $8701625638ft
feet 2.0-3.0350.1 Cross Slope (Driveway)SF246382.9to $40 $9,8401625648ft
feet .92387.7 Vertical Change REF8388.7to139749 8 ft
feet 2.0-3.0390.8 Cross Slope (Driveway)SF85402.1to $40 $3,3901625658ft
feet .71393.2 Vertical Change REF8394.2to139750 8 ft
$140,692.50TOTAL COST FOR:CHAMBERS STNside of Starting at:PACIFIC BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
594
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S CHARTER ST
Street Side
4200 CHARTER ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191504
Run ID
Charter St
73
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF398.7to $120 $4,6981483765ft
feet 4.0-5.08.7 Cross Slope (PAR)SF11333.8to $120 $13,5541483775ft
feet17.8 Continuous Width SF518.8to $120 $5401676165ft
feet .2719.3 Vertical Change REF520.3to135960 5 ft
feet35.5 Driveway100.8to165220
feet .4189.5 Vertical Change REF590.5to135961 5 ft
feet 3.0-4.0103.8 Cross Slope (PAR)SF18107.7to $120 $2,1061483785ft
feet 2.0-3.0107.7 Cross Slope (PAR)SF42117.0to $120 $5,0221483795ft
feet -.28119.2 Vertical Change REF5120.2to135962 5 ft
feet 3.0-4.0119.3 Cross Slope (PAR)SF23124.5to $120 $2,8081483805ft
feet120.6 Continuous Width REF5121.6to167331 5 ft
feet 5.0-6.0124.5 Cross Slope (PAR)SF19128.8to $120 $2,3221483815ft
feet 3.0-4.0129.6 Cross Slope (PAR)SF14132.8to $120 $1,7281483825ft
feet133.2 Driveway154.3to165221
feet 5.0-6.0155.3 Cross Slope (PAR)SF27161.3to $120 $3,2401483835ft
feet 3.0-4.0161.3 Cross Slope (PAR)SF32168.4to $120 $3,8341483845ft
feet 5.0-6.0171.0 Cross Slope (PAR)SF25176.6to $120 $3,0241483855ft
feet 3.0-4.0176.6 Cross Slope (PAR)SF57189.2to $120 $6,8041483865ft
feet184.8 Continuous Width REF5185.8to166871 5 ft
feet 2.0-3.0189.2 Cross Slope (PAR)SF70204.8to $120 $8,4241483875ft
feet 4.0-5.0204.8 Cross Slope (PAR)SF53216.6to $120 $6,3721483885ft
feet210.8 Continuous Width SF5211.8to $120 $5401671575ft
feet215.9 Continuous Width REF5216.9to167678 5 ft
feet 4.0-5.0218.8 Cross Slope (PAR)SF37227.0to $120 $4,4281483895ft
feet 2.0-3.0227.3 Cross Slope (PAR)SF14230.4to $120 $1,6741483905ft
feet 1.1230.7 Vertical Change REF5231.7to135964 5 ft
feet 5.0-6.0231.3 Cross Slope (PAR)SF27237.4to $120 $3,2941483915ft
feet 3.0-4.0237.4 Cross Slope (PAR)SF42246.7to $120 $5,0221483925ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
595
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S CHARTER ST
Street Side
4200 CHARTER ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191504
Run ID
Charter St
73
ID Sidewalk Width
Priority
feet 2.0-3.0246.7 Cross Slope (PAR)SF99268.7to $120 $11,8801483935ft
feet 4.0-5.0268.8 Cross Slope (PAR)SF14271.8to $120 $1,6201483945ft
feet 2.0-3.0271.8 Cross Slope (PAR)SF102294.5to $120 $12,2581483955ft
feet .28287.8 Vertical Change REF5288.8to135965 5 ft
feet -.51290.2 Vertical Change REF5291.2to135966 5 ft
feet 4.0-5.0294.8 Cross Slope (PAR)SF15298.1to $120 $1,7821483965ft
feet 2.0-3.0298.1 Cross Slope (PAR)SF7299.7to $120 $8641483975ft
feet 2.0-3.0302.3 Cross Slope (PAR)SF31309.1to $120 $3,6721483985ft
feet 2.0-3.0311.5 Cross Slope (PAR)SF7313.0to $120 $8101483995ft
feet 2.0-3.0315.6 Cross Slope (PAR)SF41324.6to $120 $4,8601484005ft
feet 4.0-5.0325.3 Cross Slope (PAR)SF43334.8to $120 $5,1301484015ft
feet336.0 Continuous Width REF5337.0to167679 5 ft
feet 2.0-3.0336.3 Cross Slope (PAR)SF14339.5to $120 $1,7281484025ft
feet -.27341.7 Vertical Change LF5342.7to $75 $3381359675ft
feet341.7 Driveway372.1to165222
feet .34354.5 Vertical Change REF5355.5to135968 5 ft
feet 5.0-6.0373.1 Cross Slope (PAR)SF32380.3to $120 $3,8881484035ft
feet .29373.5 Vertical Change REF5374.5to135969 5 ft
feet 3.0-4.0381.0 Cross Slope (PAR)SF5382.2to $120 $6481484045ft
feet 2.0-3.0382.3 Cross Slope (PAR)SF24387.6to $120 $2,8621484055ft
feet394.8 Driveway457.3to165223
feet .42411.7 Vertical Change REF5412.7to135970 5 ft
feet -.37415.6 Vertical Change REF5416.6to135971 5 ft
feet -.32423.5 Vertical Change REF5424.5to135972 5 ft
feet -.46432.6 Vertical Change REF5433.6to135973 5 ft
feet .3435.3 Vertical Change REF5436.3to135974 5 ft
feet 2.0-3.0458.0 Cross Slope (PAR)SF23463.0to $120 $2,7001484065ft
feet461.7 Continuous Width SF5462.7to $120 $5401668295ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
596
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S CHARTER ST
Street Side
4200 CHARTER ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191504
Run ID
Charter St
73
ID Sidewalk Width
Priority
feet 4.0-5.0463.4 Cross Slope (PAR)SF5464.4to $120 $5401484075ft
feet465.4 Driveway502.2to165224
feet .7474.5 Vertical Change REF5475.5to135975 5 ft
feet 2.0-3.0511.7 Cross Slope (PAR)SF86530.9to $120 $10,3681484085ft
feet 4.0-5.0532.8 Cross Slope (PAR)SF20537.2to $120 $2,3761484095ft
feet 3.0-4.0539.4 Cross Slope (PAR)SF50550.6to $120 $6,0481484105ft
feet 5.0-6.0550.6 Cross Slope (PAR)SF18554.7to $120 $2,2141484115ft
feet 2.0-3.0556.8 Cross Slope (PAR)SF18560.8to $120 $2,1601484125ft
feet 4.0-5.0562.1 Cross Slope (PAR)SF10564.4to $120 $1,2421484135ft
feet -.28564.4 Vertical Change REF5565.4to135976 5 ft
feet564.4 Driveway586.3to165225
feet 6.0-7.0587.7 Cross Slope (PAR)SF61601.2to $120 $7,2901484145ft
feet 5.0-6.0601.2 Cross Slope (PAR)SF50612.2to $120 $5,9401484155ft
feet 3.0-4.0612.2 Cross Slope (PAR)SF56624.7to $120 $6,7501484165ft
feet 5.0-6.0625.0 Cross Slope (PAR)SF29631.4to $120 $3,4561484175ft
feet 3.0-4.0632.2 Cross Slope (PAR)SF63646.3to $120 $7,6141484185ft
feet636.8 Continuous Width SF5637.8to $120 $5401671325ft
feet 5.0-6.0647.0 Cross Slope (PAR)SF22651.8to $120 $2,5921484195ft
feet653.7 Continuous Width SF5654.7to $120 $5401673245ft
feet 4.0-5.0653.9 Cross Slope (PAR)SF128682.4to $120 $15,3901484205ft
feet .27655.0 Vertical Change REF5656.0to135978 5 ft
feet 2.0-3.0682.4 Cross Slope (PAR)SF18686.3to $120 $2,1061484215ft
feet 4.0-5.0686.3 Cross Slope (PAR)SF17690.1to $120 $2,0521484225ft
feet .27691.0 Vertical Change LF5692.0to $75 $3381359795ft
feet691.0 Driveway712.5to165226
feet 3.0-4.0713.4 Cross Slope (PAR)SF18717.3to $120 $2,1061484235ft
feet 5.0-6.0717.3 Cross Slope (PAR)SF121744.1to $120 $14,4721484245ft
feet733.3 Continuous Width SF5734.3to $120 $5401676175ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
597
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S CHARTER ST
Street Side
4200 CHARTER ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191504
Run ID
Charter St
73
ID Sidewalk Width
Priority
feet742.1 Continuous Width REF5743.1to166963 5 ft
feet 3.0-4.0744.1 Cross Slope (PAR)SF25749.6to $120 $2,9701484255ft
feet745.6 Continuous Width REF5746.6to166872 5 ft
feet750.8 Driveway772.8to165227
feet .29771.8 Vertical Change REF5772.8to135980 5 ft
feet 3.0-4.0773.3 Cross Slope (Driveway)SF82791.6to $40 $3,2941484265ft
feet 5.0-6.0791.8 Cross Slope (PAR)SF36799.8to $120 $4,3201484275ft
feet -.31799.4 Vertical Change REF5800.4to135981 5 ft
feet799.8 Driveway820.6to165228
feet799.8 Driveway865.8to165229
feet .29820.0 Vertical Change REF5821.0to135982 5 ft
feet 5.0-6.0821.8 Cross Slope (Driveway)SF27827.7to $40 $1,0621484285ft
feet 4.0-5.0829.8 Cross Slope (Driveway)SF79847.3to $40 $3,1501484295ft
feet 2.0-3.0847.3 Cross Slope (Driveway)SF23852.5to $40 $9361484305ft
feet 4.0-5.0852.5 Cross Slope (Driveway)SF48863.1to $40 $1,9081484315ft
feet864.2 Continuous Width SF5865.2to $120 $5401672795ft
feet 2.0-3.0864.5 Cross Slope (Driveway)SF6865.8to $40 $2341484325ft
$250,101.00TOTAL COST FOR:CHARTER STSside of Starting at:4200 CHARTER ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
598
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE CHARTER ST
Street Side
4295 CHARTER ST
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912191425
Run ID
Charter St
74.25
ID Sidewalk Width
Priority
feet 3.0-4.01.3 Cross Slope (PAR)SF6816.3to $120 $8,1001484755ft
feet -.435.9 Vertical Change REF56.9to136001 5 ft
feet9.2 Continuous Width REF410.2to166948 5 ft
feet 2.0-3.016.3 Cross Slope (PAR)SF918.3to $120 $1,0801484765ft
feet 2.0-3.030.4 Cross Slope (PAR)SF12558.2to $120 $15,0121484775ft
feet -.3146.9 Vertical Change REF547.9to136002 5 ft
feet .8550.0 Vertical Change REF551.0to136003 5 ft
feet -.2659.4 Vertical Change LF560.4to $75 $3381360045ft
feet 3.0-4.060.9 Cross Slope (PAR)SF862.6to $120 $9181484785ft
feet .3161.7 Vertical Change REF562.7to136005 5 ft
feet 2.0-3.062.8 Cross Slope (PAR)SF664.2to $120 $7561484795ft
feet 4.0-5.065.6 Cross Slope (PAR)SF3673.7to $120 $4,3741484805ft
feet 2.0-3.073.7 Cross Slope (PAR)SF3080.3to $120 $3,5641484815ft
feet 2.0-3.099.3 Cross Slope (PAR)SF5100.5to $120 $6481484825ft
feet 2.0-3.0103.9 Cross Slope (PAR)SF6105.2to $120 $7021484835ft
feet 2.0-3.0110.3 Cross Slope (PAR)SF26116.1to $120 $3,1321484845ft
feet -.29113.2 Vertical Change REF5114.2to136006 5 ft
feet 3.0-4.0118.2 Cross Slope (PAR)SF33125.5to $120 $3,9421484855ft
feet 3.0-4.0127.8 Cross Slope (PAR)SF21132.5to $120 $2,5381484865ft
feet 2.0-3.0132.5 Cross Slope (PAR)SF9134.4to $120 $1,0261484875ft
feet 2.0-3.0136.8 Cross Slope (PAR)SF51148.1to $120 $6,1021484885ft
feet 2.0-3.0151.4 Cross Slope (PAR)SF50162.6to $120 $6,0481484895ft
feet 2.0-3.0197.5 Cross Slope (PAR)SF13200.3to $120 $1,5121484905ft
feet 4.0-5.0200.3 Cross Slope (PAR)SF43209.8to $120 $5,1301484915ft
feet -.26206.9 Vertical Change REF5207.9to136007 5 ft
feet 2.0-3.0220.0 Cross Slope (PAR)SF10222.3to $120 $1,2421484925ft
feet 2.0-3.0226.0 Cross Slope (PAR)SF110250.4to $120 $13,1761484935ft
feet 2.0-3.0253.1 Cross Slope (PAR)SF110277.6to $120 $13,2301484945ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
599
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE CHARTER ST
Street Side
4295 CHARTER ST
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912191425
Run ID
Charter St
74.25
ID Sidewalk Width
Priority
feet 2.0-3.0280.8 Cross Slope (PAR)SF17284.5to $120 $1,9981484955ft
feet 4.0-5.0284.5 Cross Slope (PAR)SF55296.8to $120 $6,6421484965ft
feet -.3291.9 Vertical Change REF5292.9to136008 5 ft
feet 2.0-3.0297.1 Cross Slope (PAR)SF20301.6to $120 $2,4301484975ft
feet 4.0-5.0302.3 Cross Slope (PAR)SF16305.8to $120 $1,8901484985ft
feet 2.0-3.0306.7 Cross Slope (PAR)SF54318.7to $120 $6,4801484995ft
feet 4.0-5.0319.8 Cross Slope (PAR)SF6321.2to $120 $7561485005ft
feet 2.0-3.0322.4 Cross Slope (PAR)SF8324.2to $120 $9721485015ft
feet 3.0-4.0326.4 Cross Slope (PAR)SF153360.3to $120 $18,3061485025ft
feet 2.0-3.0361.3 Cross Slope (PAR)SF18365.3to $120 $2,1601485035ft
feet 4.0-5.0365.4 Cross Slope (PAR)SF35373.1to $120 $4,1581485045ft
feet 2.0-3.0374.2 Cross Slope (PAR)SF14377.3to $120 $1,6741485055ft
feet 2.0-3.0379.9 Cross Slope (PAR)SF95401.1to $120 $11,4481485065ft
feet401.6 Driveway427.9to165235
feet -.28412.9 Vertical Change REF5413.9to136009 5 ft
feet 2.0-3.0430.3 Cross Slope (PAR)SF61443.8to $120 $7,2901485075ft
feet433.9 Continuous Width SF5434.9to $120 $5401676185ft
feet 4.0-5.0444.0 Cross Slope (PAR)SF32451.1to $120 $3,8341485085ft
feet 2.0-3.0451.8 Cross Slope (PAR)SF25457.3to $120 $2,9701485095ft
feet 2.0-3.0465.6 Cross Slope (PAR)SF39474.3to $120 $4,6981485105ft
feet 2.0-3.0483.3 Cross Slope (PAR)SF41492.3to $120 $4,8601485115ft
feet .39496.9 Vertical Change REF5497.9to136010 5 ft
feet 2.0-3.0497.3 Cross Slope (PAR)SF60510.7to $120 $7,2361485125ft
feet 4.0-5.0511.1 Cross Slope (PAR)SF47521.6to $120 $5,6701485135ft
feet519.0 Continuous Width SF5520.0to $120 $5401675725ft
feet 2.0-3.0521.9 Cross Slope (PAR)SF21526.6to $120 $2,5381485145ft
feet 4.0-5.0526.6 Cross Slope (PAR)SF32533.7to $120 $3,8341485155ft
feet534.6 Driveway587.8to165236
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
600
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE CHARTER ST
Street Side
4295 CHARTER ST
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912191425
Run ID
Charter St
74.25
ID Sidewalk Width
Priority
feet .32549.6 Vertical Change REF5550.6to136011 5 ft
feet -.42561.8 Vertical Change REF5562.8to136012 5 ft
feet 1.24570.8 Vertical Change REF5571.8to136013 5 ft
feet 4.0-5.0587.8 Cross Slope (Driveway)SF41596.8to $40 $1,6201485165ft
feet 3.0-4.0600.8 Cross Slope (PAR)SF48611.4to $120 $5,7241485175ft
feet -.28601.6 Vertical Change REF5602.6to136014 5 ft
feet 5.0-6.0611.4 Cross Slope (PAR)SF18615.3to $120 $2,1061485185ft
feet 3.0-4.0615.3 Cross Slope (PAR)SF14618.4to $120 $1,6741485195ft
feet620.9 Continuous Width SF5621.9to $120 $5401676195ft
feet 3.0-4.0622.0 Cross Slope (PAR)SF49632.8to $120 $5,8321485205ft
feet 5.0-6.0632.8 Cross Slope (PAR)SF23637.9to $120 $2,7541485215ft
feet 6.0-7.0637.9 Cross Slope (PAR)SF14641.0to $120 $1,6741485225ft
feet 5.0-6.0641.0 Cross Slope (PAR)SF10643.3to $120 $1,2421485235ft
feet 3.0-4.0643.3 Cross Slope (PAR)SF19647.5to $120 $2,2681485245ft
feet 2.0-3.0648.3 Cross Slope (PAR)SF47658.8to $120 $5,6701485255ft
feet .49651.7 Vertical Change REF5652.7to136015 5 ft
feet 4.0-5.0659.0 Cross Slope (PAR)SF18662.9to $120 $2,1061485265ft
feet 2.0-3.0663.4 Cross Slope (PAR)SF15666.8to $120 $1,8361485275ft
feet 4.0-5.0667.7 Cross Slope (PAR)SF20672.1to $120 $2,3761485285ft
feet 3.0-4.0675.0 Cross Slope (PAR)SF157709.8to $120 $18,7921485295ft
feet 2.0-3.0710.3 Cross Slope (PAR)SF23715.4to $120 $2,7541485305ft
feet 5.0-6.0717.0 Running Slope SF5718.2to $120 $6481664665ft
feet718.5 Driveway734.5to165237
feet734.5 Continuous Width SF5735.5to $120 $5401674395ft
feet 4.0-5.0734.7 Cross Slope (PAR)SF60748.1to $120 $7,2361485315ft
feet .52747.8 Vertical Change REF5748.8to136017 5 ft
feet748.5 Driveway772.3to165238
feet -.26771.9 Vertical Change REF5772.9to136018 5 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
601
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE CHARTER ST
Street Side
4295 CHARTER ST
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912191425
Run ID
Charter St
74.25
ID Sidewalk Width
Priority
feet 3.0-4.0773.8 Cross Slope (PAR)SF18777.8to $120 $2,1601485325ft
feet 2.0-3.0778.2 Cross Slope (PAR)SF52789.7to $120 $6,2101485335ft
feet 4.0-5.0789.9 Cross Slope (PAR)SF72805.8to $120 $8,5861485345ft
feet 2.0-3.0805.8 Cross Slope (PAR)SF167842.8to $120 $19,9801485355ft
feet .31838.8 Vertical Change REF5839.8to136019 5 ft
feet841.8 Continuous Width SF5842.8to $120 $5401675945ft
feet 4.0-5.0842.8 Cross Slope (PAR)SF65857.3to $120 $7,8301485365ft
feet .35848.6 Vertical Change REF5849.6to136020 5 ft
feet .27854.4 Vertical Change REF5855.4to136021 5 ft
feet 2.0-3.0857.6 Cross Slope (PAR)SF7859.1to $120 $8101485375ft
feet -.27858.4 Vertical Change REF5859.4to136022 5 ft
feet 2.0-3.0861.9 Cross Slope (PAR)SF38870.4to $120 $4,5901485385ft
feet 4.0-5.0870.8 Cross Slope (PAR)SF68885.9to $120 $8,1541485395ft
feet -.33883.7 Vertical Change REF5884.7to136023 5 ft
$321,745.50TOTAL COST FOR:CHARTER STNEside of Starting at:4295 CHARTER ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
602
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CHARTER ST
Street Side
DRIVEWAY
Survey Street Name Starting Street Name
ROAD BLOCKED
End Street Name
1912191404
Run ID
Charter St
40
ID Sidewalk Width
Priority
feet -.421.3 Vertical Change LF42.3to $75 $3381360255ft
feet 2.0-3.02.9 Cross Slope (PAR)SF146.0to $120 $1,6741485465ft
feet .617.7 Vertical Change SF48.7to $75 $3381360265ft
feet8.7 Driveway36.3to165239
feet 3.0-4.037.3 Cross Slope (PAR)SF2242.1to $120 $2,5921485475ft
feet40.5 Continuous Width SF541.5to $120 $5401675135ft
feet 2.0-3.042.7 Cross Slope (PAR)SF2448.0to $120 $2,8621485485ft
feet 4.0-5.049.3 Cross Slope (PAR)SF3456.9to $120 $4,1041485495ft
feet57.8 Driveway85.7to165240
$12,447.00TOTAL COST FOR:CHARTER STEside of Starting at:DRIVEWAY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
603
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CHARTER ST
Street Side
DRIVEWAY
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912191406
Run ID
Charter St
60
ID Sidewalk Width
Priority
feet 13.0-14.00.1 Cross Slope (PAR)SF6815.1to $120 $8,1001485405ft
feet -.3412.1 Vertical Change REF513.1to136024 5 ft
feet 1515.3 Cross Slope (PAR)SF1217.9to $120 $1,4041485415ft
feet 13.0-14.017.9 Cross Slope (PAR)SF5029.1to $120 $6,0481485425ft
feet 3.0-4.033.6 Cross Slope (PAR)SF835.3to $120 $9181485435ft
feet 2.0-3.037.3 Cross Slope (PAR)SF14168.6to $120 $16,9021485445ft
feet38.2 Continuous Width SF539.2to $120 $5401674735ft
feet66.3 Continuous Width SF567.3to $120 $5401671225ft
feet 4.0-5.068.6 Cross Slope (PAR)SF870.3to $120 $9181485455ft
$35,370.00TOTAL COST FOR:CHARTER STEside of Starting at:DRIVEWAY
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
604
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CHARTER ST
Street Side
EXCHANGE AVE
Survey Street Name Starting Street Name
ROAD BLOCKED
End Street Name
1912191402
Run ID
Charter St
52.5
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF61.3to $120 $7021485505ft
feet 2.0-3.03.3 Cross Slope (PAR)SF4212.6to $120 $5,0221485515ft
feet9.0 Continuous Width REF510.0to166940 5 ft
feet 4.0-5.012.8 Cross Slope (PAR)SF11237.8to $120 $13,5001485525ft
feet31.2 Continuous Width SF532.2to $120 $5401674115ft
feet 2.0-3.037.8 Cross Slope (PAR)SF1541.2to $120 $1,8361485535ft
feet 4.0-5.041.2 Cross Slope (PAR)SF1243.8to $120 $1,4041485545ft
feet 2.0-3.044.3 Cross Slope (PAR)SF3251.5to $120 $3,8881485555ft
feet 4.0-5.051.7 Cross Slope (PAR)SF3659.8to $120 $4,3741485565ft
feet51.8 Continuous Width SF552.8to $120 $5401671165ft
feet60.7 Driveway91.8to165241
feet -.3292.9 Vertical Change LF593.9to $75 $3381360275ft
feet 3.0-4.094.9 Cross Slope (PAR)SF89114.7to $120 $10,6921485575ft
feet115.4 Continuous Width SF5116.4to $120 $5401671175ft
feet 5.0-6.0115.8 Cross Slope (PAR)SF19120.1to $120 $2,3221485585ft
feet 3.0-4.0120.1 Cross Slope (PAR)SF43129.7to $120 $5,1841485595ft
feet125.8 Continuous Width SF5126.8to $120 $5401674575ft
feet 2.0-3.0129.7 Cross Slope (PAR)SF43139.3to $120 $5,1841485605ft
feet 4.0-5.0139.3 Cross Slope (PAR)SF14142.4to $120 $1,6741485615ft
feet 2.0-3.0142.4 Cross Slope (PAR)SF10144.7to $120 $1,2421485625ft
feet145.3 Driveway168.8to165242
feet .28163.3 Vertical Change REF4164.3to136028 5 ft
$59,521.50TOTAL COST FOR:CHARTER STEside of Starting at:EXCHANGE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
605
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S CHARTER ST
Street Side
S DOWNEY RD
Survey Street Name Starting Street Name
ROAD BLOCKED
End Street Name
1912191447
Run ID
Charter St
58
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF194.2to $120 $2,2681484335ft
feet -.285.4 Vertical Change LF56.4to $75 $3381359835ft
feet5.8 Driveway20.3to165230
feet 4.0-5.022.4 Cross Slope (PAR)SF4532.4to $120 $5,4001484345ft
feet26.6 Continuous Width SF527.6to $120 $5401678515ft
feet32.4 Continuous Width SF533.4to $120 $5401670145ft
feet 2.0-3.032.6 Cross Slope (PAR)SF3740.9to $120 $4,4821484355ft
feet50.7 Continuous Width SF551.7to $120 $5401668215ft
feet 2.0-3.053.3 Cross Slope (PAR)SF554.3to $120 $5401484365ft
feet55.0 Driveway94.6to165231
feet -.2786.4 Vertical Change REF587.4to135984 5 ft
feet 4.0-5.096.9 Cross Slope (PAR)SF41106.1to $120 $4,9681484375ft
feet107.1 Driveway127.5to165232
feet -.42114.0 Vertical Change REF5115.0to135985 5 ft
$19,615.50TOTAL COST FOR:CHARTER STSside of Starting at:S DOWNEY RD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
606
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N CHARTER ST
Street Side
S MAYWOOD AVE
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912191441
Run ID
Charter St
67
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF194.2to $120 $2,2681484385ft
feet 4.0-5.04.2 Cross Slope (PAR)SF198.4to $120 $2,2681484395ft
feet 2.0-3.08.4 Cross Slope (PAR)SF6522.8to $120 $7,7761484405ft
feet18.6 Continuous Width SF519.6to $120 $5401671095ft
feet22.8 Cold Patch 1626.4to140336 5 ft
feet 4.0-5.027.4 Cross Slope (PAR)SF1430.5to $120 $1,6741484415ft
feet -.4231.3 Vertical Change LF432.3to $75 $3381359865ft
feet31.9 Cold Patch 1034.2to140337 5 ft
feet .2633.3 Vertical Change LF534.3to $75 $3381359875ft
feet34.7 Continuous Width SF535.7to $120 $5401674375ft
feet 5.0-6.036.2 Cross Slope (PAR)SF10058.4to $120 $11,9881484425ft
feet .2655.3 Vertical Change REF556.3to135988 5 ft
feet 3.0-4.058.4 Cross Slope (PAR)SF4568.5to $120 $5,4541484435ft
feet -.3763.9 Vertical Change REF564.9to135989 5 ft
feet 2.0-3.068.5 Cross Slope (PAR)SF4678.7to $120 $5,5081484445ft
feet 3.0-4.080.9 Cross Slope (PAR)SF7697.9to $120 $9,1801484455ft
feet102.6 Continuous Width SF5103.6to $120 $5401674715ft
feet .26103.6 Vertical Change LF5104.6to $75 $3381359905ft
feet 2.0-3.0114.8 Cross Slope (PAR)SF109139.1to $120 $13,1221484465ft
feet122.5 Continuous Width REF5123.5to167181 5 ft
feet126.7 Continuous Width SF5127.7to $120 $5401675025ft
feet 4.0-5.0139.9 Cross Slope (PAR)SF9142.0to $120 $1,1341484475ft
feet 2.0-3.0148.4 Cross Slope (PAR)SF5149.5to $120 $5941484485ft
feet .49148.6 Vertical Change REF5149.6to135991 5 ft
$64,138.50TOTAL COST FOR:CHARTER STNside of Starting at:S MAYWOOD AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
607
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CHARTER ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
EXCHANGE AVE
End Street Name
1912191517
Run ID
Charter St
60
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF8619.1to $120 $10,3141483475ft
feet 2.0-3.019.1 Cross Slope (PAR)SF1522.4to $120 $1,7821483485ft
feet 4.0-5.022.4 Cross Slope (PAR)SF3630.5to $120 $4,3741483495ft
feet 2.0-3.031.2 Cross Slope (PAR)SF933.1to $120 $1,0261483505ft
feet35.8 Driveway73.8to165217
feet 6.0-7.074.4 Cross Slope (Driveway)SF1778.2to $40 $6841483515ft
feet79.4 Continuous Width SF580.4to $120 $5401668285ft
feet 5.0-6.079.5 Cross Slope (PAR)SF2083.9to $120 $2,3761483525ft
feet 6.0-7.083.9 Cross Slope (PAR)SF1487.1to $120 $1,7281483535ft
feet -.2785.2 Vertical Change REF586.2to135958 5 ft
feet 5.0-6.087.1 Cross Slope (PAR)SF1189.5to $120 $1,2961483545ft
feet89.5 Driveway118.7to165218
feet 3.0-4.0119.9 Cross Slope (PAR)SF23125.0to $120 $2,7541483555ft
feet125.0 Driveway142.2to165219
feet 2.0-3.0148.1 Cross Slope (PAR)SF37156.3to $120 $4,4281483565ft
feet 2.0-3.0163.3 Cross Slope (PAR)SF4164.3to $120 $5401483575ft
feet 3.0-4.0167.5 Cross Slope (PAR)SF38176.0to $120 $4,5901483585ft
feet 2.0-3.0176.2 Cross Slope (PAR)SF57188.8to $120 $6,8041483595ft
feet187.7 Continuous Width REF5188.7to167329 5 ft
feet 3.0-4.0191.4 Cross Slope (PAR)SF102214.0to $120 $12,2041483605ft
feet 3.0-4.0217.5 Cross Slope (PAR)SF5218.7to $120 $6481483615ft
feet 2.0-3.0218.9 Cross Slope (PAR)SF54230.8to $120 $6,4261483625ft
feet219.7 Continuous Width SF5220.7to $120 $5401674705ft
feet 3.0-4.0237.3 Cross Slope (PAR)SF13240.2to $120 $1,5661483635ft
feet 2.0-3.0240.4 Cross Slope (PAR)SF33247.8to $120 $3,9961483645ft
feet 4.0-5.0248.1 Cross Slope (PAR)SF47258.5to $120 $5,6161483655ft
feet 2.0-3.0258.5 Cross Slope (PAR)SF35266.3to $120 $4,2121483665ft
feet 4.0-5.0266.3 Cross Slope (PAR)SF65280.8to $120 $7,8301483675ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
608
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CHARTER ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
EXCHANGE AVE
End Street Name
1912191517
Run ID
Charter St
60
ID Sidewalk Width
Priority
feet 2.0-3.0281.7 Cross Slope (PAR)SF102304.3to $120 $12,2041483685ft
feet 4.0-5.0305.4 Cross Slope (PAR)SF9307.3to $120 $1,0261483695ft
feet 2.0-3.0308.2 Cross Slope (PAR)SF5309.2to $120 $5401483705ft
feet 4.0-5.0314.1 Cross Slope (PAR)SF12316.7to $120 $1,4041483715ft
feet 2.0-3.0316.7 Cross Slope (PAR)SF40325.5to $120 $4,7521483725ft
feet 5.0-6.0327.0 Cross Slope (PAR)SF36334.9to $120 $4,2661483735ft
feet 3.0-4.0335.9 Cross Slope (PAR)SF36344.0to $120 $4,3741483745ft
feet 2.0-3.0344.0 Cross Slope (PAR)SF36352.1to $120 $4,3741483755ft
feet346.8 Continuous Width SF5347.8to $120 $5401671145ft
$119,754.00TOTAL COST FOR:CHARTER STWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
609
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CORONA AVE
Street Side
DISTRICT BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912181320
Run ID
Corona Ave
61.25
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF405.3to $120 $4,7701499528ft
feet 4.0-5.05.8 Cross Slope (PAR)SF309.8to $120 $3,6001499538ft
feet 2.0-3.010.8 Cross Slope (PAR)SF20838.5to $120 $24,9301499548ft
feet 4.0-5.039.3 Cross Slope (PAR)SF3043.3to $120 $3,6001499558ft
feet 3.0-4.046.2 Cross Slope (PAR)SF1948.7to $120 $2,2501499568ft
feet 2.0-3.049.0 Cross Slope (PAR)SF3553.7to $120 $4,2301499578ft
feet 6.0-7.054.5 Running Slope SF1456.4to $120 $1,7101664738ft
feet 8.0-9.058.0 Cross Slope (PAR)SF2961.8to $120 $3,4201499588ft
feet 10.0-11.062.2 Cross Slope (PAR)SF1964.7to $120 $2,2501499598ft
feet 7.0-8.065.0 Cross Slope (PAR)SF14083.7to $120 $16,8301499608ft
feet 7.0-8.084.3 Running Slope SF1085.6to $120 $1,1701664748ft
feet -.3286.4 Vertical Change LF887.4to $75 $5631363628ft
feet 5.0-6.093.3 Running Slope REF1194.8to166475 8 ft
feet 2.0-3.093.6 Cross Slope (Driveway)SF2596.9to $40 $9901499618ft
$70,312.50TOTAL COST FOR:CORONA AVEWside of Starting at:DISTRICT BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
610
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CORONA AVE
Street Side
E 48TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912181315
Run ID
Corona Ave
35
ID Sidewalk Width
Priority
feet 2.0-3.07.9 Cross Slope (PAR)SF10822.3to $120 $12,9601499748ft
feet 4.0-5.023.3 Cross Slope (PAR)SF2626.7to $120 $3,0601499758ft
feet 2.0-3.027.3 Cross Slope (PAR)SF2330.4to $120 $2,7901499768ft
feet 2.0-3.034.3 Cross Slope (PAR)SF2637.7to $120 $3,0601499778ft
feet 4.0-5.040.6 Cross Slope (PAR)SF1943.1to $120 $2,2501499788ft
feet 2.0-3.044.5 Cross Slope (PAR)SF5351.5to $120 $6,3001499798ft
feet .2949.5 Vertical Change REF850.5to136365 8 ft
feet 2.0-3.054.5 Cross Slope (PAR)SF4160.0to $120 $4,9501499808ft
feet 4.0-5.060.0 Cross Slope (PAR)SF1962.5to $120 $2,2501499818ft
feet 2.0-3.062.5 Cross Slope (PAR)SF863.5to $120 $9001499828ft
feet 2.0-3.065.6 Cross Slope (PAR)SF966.8to $120 $1,0801499838ft
feet 4.0-5.069.0 Cross Slope (PAR)SF2972.9to $120 $3,5101499848ft
feet 2.0-3.074.2 Cross Slope (PAR)SF9286.5to $120 $11,0701499858ft
feet 3.0-4.088.6 Cross Slope (PAR)SF2792.2to $120 $3,2401499868ft
feet92.6 Driveway109.8to164442
$57,420.00TOTAL COST FOR:CORONA AVEEside of Starting at:E 48TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
611
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CORONA AVE
Street Side
E 48TH ST
Survey Street Name Starting Street Name
E 49TH ST
End Street Name
1912171528
Run ID
Corona Ave
45.5
ID Sidewalk Width
Priority
feet 2.0-3.00.4 Cross Slope (PAR)SF263.9to $120 $3,1501505688ft
feet 3.0-4.08.0 Cross Slope (PAR)SF9220.2to $120 $10,9801505698ft
feet -.7218.7 Vertical Change REF819.7to136530 8 ft
feet 3.0-4.022.5 Cross Slope (PAR)SF6731.4to $120 $8,0101505708ft
feet 2.0-3.032.6 Cross Slope (PAR)SF5339.6to $120 $6,3001505718ft
feet 4.0-5.041.0 Cross Slope (PAR)SF26676.4to $120 $31,8601505728ft
feet 2.0-3.077.2 Cross Slope (PAR)SF2480.4to $120 $2,8801505738ft
feet 4.0-5.080.4 Cross Slope (PAR)SF339125.6to $120 $40,6801505748ft
feet .29112.2 Vertical Change REF8113.2to136531 8 ft
feet 4.0-5.0127.8 Cross Slope (PAR)SF55135.2to $120 $6,6601505758ft
feet 6.0-7.0135.2 Cross Slope (PAR)SF20137.8to $120 $2,3401505768ft
feet 4.0-5.0139.2 Cross Slope (PAR)SF148158.9to $120 $17,7301505778ft
feet 4.0-5.0161.7 Cross Slope (PAR)SF38166.7to $120 $4,5001505788ft
feet 2.0-3.0167.2 Cross Slope (PAR)SF16169.3to $120 $1,8901505798ft
feet .43167.8 Vertical Change REF8168.8to136532 8 ft
feet 4.0-5.0172.0 Cross Slope (PAR)SF122188.3to $120 $14,6701505808ft
$151,650.00TOTAL COST FOR:CORONA AVEWside of Starting at:E 48TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
612
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CORONA AVE
Street Side
E 49TH ST
Survey Street Name Starting Street Name
E 48TH ST
End Street Name
1912171525
Run ID
Corona Ave
45.5
ID Sidewalk Width
Priority
feet 2.0-3.013.9 Cross Slope (PAR)SF4219.5to $120 $5,0401505818ft
feet 3.0-4.029.2 Cross Slope (PAR)SF2232.1to $120 $2,6101505828ft
feet 2.0-3.032.8 Cross Slope (PAR)SF6040.8to $120 $7,2001505838ft
feet .3441.2 Vertical Change LF842.2to $75 $5631365338ft
feet 2.0-3.045.7 Cross Slope (PAR)SF2749.3to $120 $3,2401505848ft
feet 2.0-3.054.6 Cross Slope (PAR)SF4660.7to $120 $5,4901505858ft
feet 2.0-3.066.3 Cross Slope (PAR)SF12282.5to $120 $14,5801505868ft
feet .2866.9 Vertical Change REF867.9to136534 8 ft
feet 2.0-3.085.8 Cross Slope (PAR)SF3590.5to $120 $4,2301505878ft
feet 4.0-5.090.8 Cross Slope (PAR)SF4196.3to $120 $4,9501505888ft
feet .2892.6 Vertical Change REF893.6to136535 8 ft
feet 2.0-3.096.3 Cross Slope (PAR)SF1197.8to $120 $1,3501505898ft
feet 5.0-6.0103.8 Cross Slope (PAR)SF26107.3to $120 $3,1501505908ft
feet -.26106.6 Vertical Change REF8107.6to136536 8 ft
feet 3.0-4.0107.9 Cross Slope (PAR)SF11109.3to $120 $1,2601505918ft
feet 2.0-3.0114.6 Cross Slope (PAR)SF13116.3to $120 $1,5301505928ft
feet .47118.7 Vertical Change LF8119.7to $75 $5631365378ft
feet 2.0-3.0123.7 Cross Slope (PAR)SF76133.8to $120 $9,0901505938ft
feet 4.0-5.0133.8 Cross Slope (PAR)SF37138.7to $120 $4,4101505948ft
feet 2.0-3.0138.8 Cross Slope (PAR)SF10140.2to $120 $1,2601505958ft
feet 2.0-3.0144.2 Cross Slope (PAR)SF325187.5to $120 $38,9701505968ft
feet 2.0-3.0189.8 Cross Slope (PAR)SF58197.5to $120 $6,9301505978ft
feet 2.0-3.0212.6 Cross Slope (PAR)SF9213.8to $120 $1,0801505988ft
feet 4.0-5.0214.4 Cross Slope (PAR)SF29218.3to $120 $3,5101505998ft
feet 4.0-5.0220.4 Cross Slope (PAR)SF26223.8to $120 $3,0601506008ft
$124,065.00TOTAL COST FOR:CORONA AVEEside of Starting at:E 49TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
613
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CORONA AVE
Street Side
E 49TH ST
Survey Street Name Starting Street Name
E 50TH ST
End Street Name
1912171222
Run ID
Corona Ave
44
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF10113.4to $120 $12,0601510448ft
feet 2.0-3.015.2 Cross Slope (PAR)SF14334.2to $120 $17,1001510458ft
feet 2.0-3.041.4 Cross Slope (PAR)SF5648.8to $120 $6,6601510468ft
feet57.9 Driveway136.8to164440
feet .890.0 Vertical Change REF891.0to136645 8 ft
feet .2996.4 Vertical Change REF897.4to136646 8 ft
feet -.39112.8 Vertical Change REF8113.8to136647 8 ft
feet .28125.6 Vertical Change REF8126.6to136648 8 ft
feet 2.0-3.0136.9 Cross Slope (Driveway)SF60144.9to $40 $2,4001510478ft
feet 4.0-5.0144.9 Cross Slope (PAR)SF86156.4to $120 $10,3501510488ft
feet 2.0-3.0156.6 Cross Slope (PAR)SF36161.4to $120 $4,3201510498ft
feet 4.0-5.0161.6 Cross Slope (PAR)SF32165.9to $120 $3,8701510508ft
feet 2.0-3.0165.9 Cross Slope (PAR)SF38170.9to $120 $4,5001510518ft
feet 4.0-5.0171.2 Cross Slope (PAR)SF31175.3to $120 $3,6901510528ft
feet 2.0-3.0175.3 Cross Slope (PAR)SF126192.1to $120 $15,1201510538ft
feet 1.41192.6 Vertical Change SF8193.6to $75 $5631366498ft
$80,632.50TOTAL COST FOR:CORONA AVEWside of Starting at:E 49TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
614
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CORONA AVE
Street Side
E 50TH ST
Survey Street Name Starting Street Name
E 49TH ST
End Street Name
1912171218
Run ID
Corona Ave
45.25
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF405.3to $120 $4,7701510548ft
feet 4.0-5.05.3 Cross Slope (PAR)SF31447.2to $120 $37,7101510558ft
feet 2.0-3.048.8 Cross Slope (PAR)SF6357.2to $120 $7,5601510568ft
feet57.2 Driveway111.9to164441
feet -.2657.4 Vertical Change REF858.4to136650 8 ft
feet 6.0-7.0112.3 Running Slope REF17114.6to166477 8 ft
feet .78113.0 Vertical Change SF8114.0to $75 $5631366518ft
feet 4.0-5.0115.5 Cross Slope (PAR)SF21118.3to $120 $2,5201510578ft
feet -.43118.3 Vertical Change REF8119.3to136652 8 ft
feet 2.0-3.0122.2 Cross Slope (PAR)SF99135.4to $120 $11,8801510588ft
feet .31126.3 Vertical Change REF8127.3to136653 8 ft
feet139.0 Driveway161.8to165441
feet 2.0-3.0162.8 Cross Slope (PAR)SF298202.6to $120 $35,8201510598ft
feet .29175.9 Vertical Change REF8176.9to136654 8 ft
feet .28189.9 Vertical Change REF8190.9to136655 8 ft
$100,822.50TOTAL COST FOR:CORONA AVEEside of Starting at:E 50TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
615
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CORONA AVE
Street Side
E 50TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912171205
Run ID
Corona Ave
32
ID Sidewalk Width
Priority
feet 3.0-4.02.0 Cross Slope (PAR)SF194.6to $120 $2,3401510898ft
feet 2.0-3.04.8 Cross Slope (PAR)SF5311.8to $120 $6,3001510908ft
feet 2.0-3.016.9 Cross Slope (PAR)SF19743.1to $120 $23,5801510918ft
feet 2.0-3.049.6 Cross Slope (PAR)SF14268.5to $120 $17,0101510928ft
feet 2.0-3.072.8 Cross Slope (PAR)SF7983.3to $120 $9,4501510938ft
feet 2.0-3.089.4 Cross Slope (PAR)SF890.4to $120 $9001510948ft
feet 2.0-3.094.7 Cross Slope (PAR)SF296134.1to $120 $35,4601510958ft
feet 2.0-3.0139.3 Cross Slope (PAR)SF136157.5to $120 $16,3801510968ft
$111,420.00TOTAL COST FOR:CORONA AVEWside of Starting at:E 50TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
616
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CORONA AVE
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912171210
Run ID
Corona Ave
35
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF374.9to $120 $4,4101510758ft
feet -.264.1 Vertical Change REF85.1to136664 8 ft
feet 2.0-3.05.3 Cross Slope (PAR)SF28743.5to $120 $34,3801510768ft
feet44.4 Cold Patch 3248.7to140439 8 ft
feet 2.0-3.056.3 Cross Slope (PAR)SF1958.8to $120 $2,2501510778ft
feet 2.0-3.067.8 Cross Slope (PAR)SF18592.5to $120 $22,2301510788ft
feet 2.0-3.094.8 Cross Slope (PAR)SF110109.4to $120 $13,1401510798ft
$76,410.00TOTAL COST FOR:CORONA AVEEside of Starting at:FRUITLAND AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
617
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CORONA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 50TH ST
End Street Name
1912171215
Run ID
Corona Ave
47
ID Sidewalk Width
Priority
feet 2.0-3.00.1 Cross Slope (PAR)SF10313.8to $120 $12,3301510608ft
feet 2.0-3.016.0 Cross Slope (PAR)SF1818.4to $120 $2,1601510618ft
feet19.0 Cold Patch 2021.6to140438 8 ft
feet .4620.6 Vertical Change LF2523.9to $75 $1,8561366568ft
feet22.6 Continuous Width SF823.6to $120 $9001667958ft
feet 3.0-4.026.8 Cross Slope (PAR)SF3831.9to $120 $4,5901510628ft
feet 2.0-3.031.9 Cross Slope (PAR)SF6640.7to $120 $7,9201510638ft
feet 3.0-4.043.9 Cross Slope (PAR)SF7954.4to $120 $9,4501510648ft
feet .2950.2 Vertical Change REF851.2to136657 8 ft
feet 2.0-3.055.4 Cross Slope (PAR)SF12672.2to $120 $15,1201510658ft
feet -.4371.2 Vertical Change REF872.2to136658 8 ft
feet 4.0-5.075.0 Cross Slope (PAR)SF3079.0to $120 $3,6001510668ft
feet 2.0-3.079.3 Cross Slope (PAR)SF7589.3to $120 $9,0001510678ft
feet 4.0-5.089.3 Cross Slope (PAR)SF6898.3to $120 $8,1001510688ft
feet -.396.1 Vertical Change REF897.1to136659 8 ft
feet 3.0-4.0100.8 Cross Slope (PAR)SF11102.3to $120 $1,3501510698ft
feet -.29105.8 Vertical Change REF8106.8to136660 8 ft
feet 2.0-3.0105.8 Cross Slope (PAR)SF179129.7to $120 $21,5101510708ft
feet -.26127.2 Vertical Change REF7128.2to136661 8 ft
feet 4.0-5.0131.2 Cross Slope (PAR)SF94143.7to $120 $11,2501510718ft
feet .37134.1 Vertical Change REF8135.1to136662 8 ft
feet -.55140.7 Vertical Change REF8141.7to136663 8 ft
feet 2.0-3.0145.0 Cross Slope (PAR)SF22147.9to $120 $2,6101510728ft
feet 4.0-5.0148.6 Cross Slope (PAR)SF13150.3to $120 $1,5301510738ft
feet 2.0-3.0150.9 Cross Slope (PAR)SF76161.0to $120 $9,0901510748ft
$122,366.25TOTAL COST FOR:CORONA AVEEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
618
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E CORONA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
DISTRICT BLVD
End Street Name
1912181317
Run ID
Corona Ave
50
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF658.7to $120 $7,8301499628ft
feet 5.0-6.08.7 Cross Slope (PAR)SF89.8to $120 $9901499638ft
feet 6.0-7.09.8 Cross Slope (PAR)SF1612.0to $120 $1,9801499648ft
feet 5.0-6.012.0 Cross Slope (PAR)SF6821.0to $120 $8,1001499658ft
feet 3.0-4.022.3 Cross Slope (PAR)SF1524.3to $120 $1,8001499668ft
feet 2.0-3.024.3 Cross Slope (PAR)SF4430.2to $120 $5,3101499678ft
feet -.2628.4 Vertical Change REF829.4to136363 8 ft
feet 2.0-3.037.9 Cross Slope (PAR)SF2641.3to $120 $3,0601499688ft
feet 3.0-4.047.2 Cross Slope (PAR)SF3852.3to $120 $4,5901499698ft
feet 2.0-3.067.7 Cross Slope (PAR)SF7477.5to $120 $8,8201499708ft
feet 2.0-3.087.3 Cross Slope (PAR)SF888.4to $120 $9901499718ft
feet93.5 Cold Patch 2696.9to140398 8 ft
feet .5196.7 Vertical Change SF897.7to $75 $5631363648ft
feet 2.0-3.099.3 Cross Slope (PAR)SF23102.3to $120 $2,7001499728ft
feet 3.0-4.0106.7 Cross Slope (PAR)SF22109.6to $120 $2,6101499738ft
$49,342.50TOTAL COST FOR:CORONA AVEEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
619
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CORONA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912171207
Run ID
Corona Ave
35
ID Sidewalk Width
Priority
feet 2.0-3.02.4 Cross Slope (PAR)SF144.0to $120 $1,6321510809ft
feet 4.0-5.06.4 Cross Slope (PAR)SF4411.6to $120 $5,3041510819ft
feet 2.0-3.012.5 Cross Slope (PAR)SF1914.7to $120 $2,2441510829ft
feet 2.0-3.021.9 Cross Slope (PAR)SF24150.3to $120 $28,9681510839ft
feet 4.0-5.050.5 Cross Slope (PAR)SF3154.1to $120 $3,6721510849ft
feet 2.0-3.056.0 Cross Slope (PAR)SF4661.4to $120 $5,5081510859ft
feet -.2659.2 Vertical Change REF3263.0to136665 9 ft
feet 4.0-5.061.8 Cross Slope (PAR)SF3065.3to $120 $3,5701510869ft
feet 2.0-3.065.9 Cross Slope (PAR)SF3570.0to $120 $4,1821510879ft
feet 2.0-3.073.1 Cross Slope (PAR)SF16892.9to $120 $20,1961510889ft
$75,276.00TOTAL COST FOR:CORONA AVEWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
620
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
W CORONA AVE
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 48TH ST
End Street Name
1912181321
Run ID
Corona Ave
32
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF618.1to $120 $7,2901499468ft
feet 2.0-3.010.2 Cross Slope (PAR)SF9322.6to $120 $11,1601499478ft
feet22.6 Driveway45.5to165354
feet 3.0-4.046.4 Cross Slope (Driveway)SF16868.8to $40 $6,7201499488ft
feet 2.0-3.068.8 Cross Slope (PAR)SF2772.4to $120 $3,2401499498ft
feet 3.0-4.075.9 Cross Slope (PAR)SF4882.3to $120 $5,7601499508ft
feet 4.0-5.086.4 Cross Slope (PAR)SF2990.3to $120 $3,5101499518ft
$37,680.00TOTAL COST FOR:CORONA AVEWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
621
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
CORONA AVE
Survey Street Name Starting Street Name
LOMA VISTA AVE
End Street Name
1912191128
Run ID
District Blvd
79
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF16517.4to $120 $19,83614877310ft
feet 2.0-3.024.1 Cross Slope (PAR)SF3227.5to $120 $3,87614877410ft
feet 2.0-3.034.8 Cross Slope (PAR)SF7843.0to $120 $9,34814877510ft
feet 3.0-4.045.1 Cross Slope (PAR)SF7853.3to $120 $9,34814877610ft
feet -.2645.6 Vertical Change REF1046.6to136096 10 ft
feet 3.0-4.056.3 Cross Slope (PAR)SF4360.8to $120 $5,13014877710ft
feet61.9 Driveway106.8to165269
feet 4.0-5.0106.8 Cross Slope (Driveway)SF13108.2to $40 $53214877810ft
feet 2.0-3.0109.7 Cross Slope (PAR)SF29112.8to $120 $3,53414877910ft
feet 4.0-5.0112.9 Cross Slope (PAR)SF13114.3to $120 $1,59614878010ft
feet114.3 Driveway136.8to165270
feet 3.0-4.0137.6 Cross Slope (PAR)SF105148.7to $120 $12,65414878110ft
feet 2.0-3.0149.4 Cross Slope (PAR)SF32152.8to $120 $3,87614878210ft
feet 4.0-5.0153.4 Cross Slope (PAR)SF257180.5to $120 $30,89414878310ft
feet 3.0-4.0183.1 Cross Slope (PAR)SF22185.4to $120 $2,62214878410ft
feet 3.0-4.0195.1 Cross Slope (PAR)SF102205.8to $120 $12,19814878510ft
feet 5.0-6.0206.1 Cross Slope (PAR)SF34209.7to $120 $4,10414878610ft
feet 3.0-4.0211.3 Cross Slope (PAR)SF23213.7to $120 $2,73614878710ft
feet 2.0-3.0216.0 Cross Slope (PAR)SF104226.9to $120 $12,42614878810ft
feet .78229.2 Vertical Change SF10230.2to $75 $71313609710ft
feet 2.0-3.0230.8 Cross Slope (PAR)SF19232.8to $120 $2,28014878910ft
feet 4.0-5.0234.5 Cross Slope (PAR)SF148250.1to $120 $17,78414879010ft
feet 2.55247.9 Vertical Change REF10248.9to136098 10 ft
feet 2.0-3.0250.1 Cross Slope (PAR)SF71257.6to $120 $8,55014879110ft
feet257.6 Driveway306.6to165271
feet 3.0-4.0308.3 Cross Slope (PAR)SF35312.0to $120 $4,21814879210ft
feet 2.0-3.0312.0 Cross Slope (PAR)SF22314.3to $120 $2,62214879310ft
feet314.8 Driveway362.7to165272
feet 2.0-3.0363.9 Cross Slope (PAR)SF26366.6to $120 $3,07814879410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
622
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
CORONA AVE
Survey Street Name Starting Street Name
LOMA VISTA AVE
End Street Name
1912191128
Run ID
District Blvd
79
ID Sidewalk Width
Priority
feet 3.0-4.0369.2 Cross Slope (PAR)SF54374.9to $120 $6,49814879510ft
feet 5.0-6.0375.5 Cross Slope (PAR)SF41379.8to $120 $4,90214879610ft
feet 4.0-5.0383.9 Cross Slope (PAR)SF99394.3to $120 $11,85614879710ft
feet 2.0-3.0394.3 Cross Slope (PAR)SF99404.7to $120 $11,85614879810ft
feet .33399.5 Vertical Change REF10400.5to136099 10 ft
feet -.44401.4 Vertical Change REF10402.4to136100 10 ft
feet402.1 Protruding Object JOB10403.1to $99 $9916731710ft
feet 4.0-5.0405.9 Cross Slope (PAR)SF29408.9to $120 $3,42014879910ft
feet 2.0-3.0409.6 Cross Slope (PAR)SF159426.3to $120 $19,03814880010ft
feet 4.0-5.0427.7 Cross Slope (PAR)SF48432.7to $120 $5,70014880110ft
feet 2.0-3.0433.5 Cross Slope (PAR)SF15435.1to $120 $1,82414880210ft
feet 2.0-3.0437.3 Cross Slope (PAR)SF22439.6to $120 $2,62214880310ft
feet 4.0-5.0439.6 Cross Slope (PAR)SF24442.1to $120 $2,85014880410ft
feet 5.0-6.0444.3 Cross Slope (PAR)SF79452.6to $120 $9,46214880510ft
feet .33446.4 Vertical Change REF10447.4to136101 10 ft
feet 6.0-7.0454.4 Cross Slope (PAR)SF17456.2to $120 $2,05214880610ft
feet 6.0-7.0460.3 Cross Slope (PAR)SF10461.3to $120 $1,14014880710ft
feet 5.0-6.0462.3 Cross Slope (PAR)SF26465.0to $120 $3,07814880810ft
feet 4.0-5.0467.3 Cross Slope (PAR)SF108478.7to $120 $12,99614880910ft
feet 6.0-7.0479.5 Cross Slope (PAR)SF27482.3to $120 $3,19214881010ft
feet 5.0-6.0482.3 Cross Slope (PAR)SF11483.5to $120 $1,36814881110ft
feet 3.0-4.0484.6 Cross Slope (PAR)SF88493.9to $120 $10,60214881210ft
feet 2.0-3.0494.5 Cross Slope (PAR)SF17496.3to $120 $2,05214881310ft
feet 2.0-3.0500.2 Cross Slope (PAR)SF25502.8to $120 $2,96414881410ft
feet 2.0-3.0505.3 Cross Slope (PAR)SF49510.5to $120 $5,92814881510ft
feet 3.0-4.0513.2 Cross Slope (PAR)SF48518.3to $120 $5,81414881610ft
feet518.3 Driveway571.3to165273
feet 3.0-4.0572.7 Cross Slope (PAR)SF57578.7to $120 $6,84014881710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
623
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
CORONA AVE
Survey Street Name Starting Street Name
LOMA VISTA AVE
End Street Name
1912191128
Run ID
District Blvd
79
ID Sidewalk Width
Priority
feet 2.0-3.0580.4 Cross Slope (PAR)SF100590.9to $120 $11,97014881810ft
feet 2.0-3.0593.7 Cross Slope (PAR)SF69601.0to $120 $8,32214881910ft
feet -.31597.5 Vertical Change REF10598.5to136103 10 ft
feet 2.0-3.0605.7 Cross Slope (PAR)SF17607.5to $120 $2,05214882010ft
feet 2.0-3.0610.1 Cross Slope (PAR)SF214632.6to $120 $25,65014882110ft
feet 2.0-3.0636.8 Cross Slope (PAR)SF11638.0to $120 $1,36814882210ft
feet 2.0-3.0645.7 Cross Slope (PAR)SF224669.3to $120 $26,90414882310ft
feet 2.0-3.0680.3 Cross Slope (PAR)SF179699.1to $120 $21,43214882410ft
feet 1.69683.0 Vertical Change REF10684.0to136104 10 ft
feet 2.0-3.0720.8 Cross Slope (PAR)SF37724.7to $120 $4,44614882510ft
feet 2.0-3.0734.8 Cross Slope (PAR)SF39738.9to $120 $4,67414882610ft
feet 2.37735.3 Vertical Change REF10736.3to136105 10 ft
feet 2.0-3.0780.6 Cross Slope (PAR)SF11781.8to $120 $1,36814882710ft
feet 2.0-3.0789.8 Cross Slope (PAR)SF59796.0to $120 $7,06814882810ft
feet801.5 Driveway824.1to165274
feet -.28804.0 Vertical Change REF10805.0to136106 10 ft
feet .26812.8 Vertical Change REF10813.8to136107 10 ft
feet 4.0-5.0825.3 Cross Slope (PAR)SF62831.8to $120 $7,41014882910ft
feet -.26833.0 Vertical Change REF10834.0to136108 10 ft
feet 3.0-4.0834.0 Cross Slope (PAR)SF17835.8to $120 $2,05214883010ft
feet 2.0-3.0836.7 Cross Slope (PAR)SF131850.5to $120 $15,73214883110ft
feet 2.0-3.0855.8 Cross Slope (PAR)SF166873.3to $120 $19,95014883210ft
feet 4.0-5.0873.6 Cross Slope (PAR)SF10874.6to $120 $1,14014883310ft
feet 6.0-7.0874.8 Cross Slope (PAR)SF30878.0to $120 $3,64814883410ft
feet 3.0-4.0879.6 Cross Slope (PAR)SF26882.3to $120 $3,07814883510ft
feet 2.0-3.0882.3 Cross Slope (PAR)SF118894.7to $120 $14,13614883610ft
feet 4.0-5.0894.7 Cross Slope (PAR)SF112906.5to $120 $13,45214883710ft
feet 2.0-3.0906.5 Cross Slope (PAR)SF51911.9to $120 $6,15614883810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
624
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
CORONA AVE
Survey Street Name Starting Street Name
LOMA VISTA AVE
End Street Name
1912191128
Run ID
District Blvd
79
ID Sidewalk Width
Priority
feet 2.0-3.0941.2 Cross Slope (PAR)SF259968.5to $120 $31,12214883910ft
feet 4.0-5.0968.8 Cross Slope (PAR)SF76976.8to $120 $9,12014884010ft
feet 2.0-3.0978.9 Cross Slope (PAR)SF26981.6to $120 $3,07814884110ft
feet -.3997.9 Vertical Change LF10998.9to $75 $71313610910ft
feet 3.0-4.01001.6 Cross Slope (PAR)SF261004.3to $120 $3,07814884210ft
feet 2.0-3.01004.3 Cross Slope (PAR)SF171006.1to $120 $2,05214884310ft
feet 3.0-4.01012.9 Cross Slope (PAR)SF351016.6to $120 $4,21814884410ft
feet 2.0-3.01018.5 Cross Slope (PAR)SF261021.2to $120 $3,07814884510ft
$570,574.00TOTAL COST FOR:DISTRICT BLVDNside of Starting at:CORONA AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
625
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S / SW DISTRICT BLVD
Street Side
CORONA AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912190855
Run ID
District Blvd
70
ID Sidewalk Width
Priority
feet 3.0-4.00.8 Cross Slope (PAR)SF121.9to $120 $1,38614937511ft
feet2.8 Cold Patch 346.0to140373 11 ft
feet .284.2 Vertical Change LF115.2to $75 $78813623311ft
feet11.2 Cold Patch 4015.0to140374 11 ft
feet 3.0-4.016.9 Cross Slope (PAR)SF14630.8to $120 $17,51414937611ft
feet 2.0-3.030.8 Cross Slope (PAR)SF3333.9to $120 $3,90614937711ft
feet 4.0-5.034.3 Cross Slope (PAR)SF5739.7to $120 $6,80414937811ft
feet 2.0-3.040.6 Cross Slope (PAR)SF1341.8to $120 $1,51214937911ft
feet 2.0-3.051.4 Cross Slope (PAR)SF5756.8to $120 $6,80414938011ft
feet 3.4953.4 Vertical Change REF1154.4to136234 11 ft
feet 3.0-4.059.0 Cross Slope (PAR)SF5063.8to $120 $6,04814938111ft
feet 2.0-3.063.8 Cross Slope (PAR)SF1164.8to $120 $1,26014938211ft
feet 2.0-3.068.4 Cross Slope (PAR)SF23190.4to $120 $27,72014938311ft
feet92.3 Driveway110.2to165314
feet 4.0-5.0110.3 Cross Slope (Driveway)SF82118.1to $40 $3,27614938411ft
feet 1.79113.5 Vertical Change REF11114.5to136235 11 ft
feet 2.0-3.0118.1 Cross Slope (PAR)SF122129.7to $120 $14,61614938511ft
feet 4.0-5.0129.7 Cross Slope (PAR)SF70136.4to $120 $8,44214938611ft
feet 2.0-3.0136.4 Cross Slope (PAR)SF12137.5to $120 $1,38614938711ft
feet138.1 Driveway161.6to165315
feet 3.12161.9 Vertical Change REF11162.9to136236 11 ft
feet 3.0-4.0162.3 Cross Slope (Driveway)SF51167.2to $40 $2,05814938811ft
feet 2.0-3.0167.4 Cross Slope (PAR)SF13168.6to $120 $1,51214938911ft
feet 2.0-3.0175.3 Cross Slope (PAR)SF37178.8to $120 $4,41014939011ft
feet 2.0-3.0187.3 Cross Slope (PAR)SF16188.8to $120 $1,89014939111ft
feet -.28189.1 Vertical Change LF11190.1to $75 $78813623711ft
feet 4.0-5.0194.6 Cross Slope (PAR)SF34197.8to $120 $4,03214939211ft
feet 3.0-4.0201.8 Cross Slope (PAR)SF34205.0to $120 $4,03214939311ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
626
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S / SW DISTRICT BLVD
Street Side
CORONA AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912190855
Run ID
District Blvd
70
ID Sidewalk Width
Priority
feet 5.0-6.0205.0 Cross Slope (PAR)SF24207.3to $120 $2,89814939411ft
feet 6.0-7.0210.3 Cross Slope (PAR)SF16211.8to $120 $1,89014939511ft
feet 4.0-5.0213.8 Cross Slope (PAR)SF63219.8to $120 $7,56014939611ft
feet 2.0-3.0222.8 Cross Slope (PAR)SF27225.4to $120 $3,27614939711ft
feet 4.0-5.0226.0 Cross Slope (PAR)SF23228.2to $120 $2,77214939811ft
feet 5.0-6.0230.7 Cross Slope (PAR)SF43234.8to $120 $5,16614939911ft
feet 3.0-4.0235.1 Cross Slope (PAR)SF106245.2to $120 $12,72614940011ft
feet 2.0-3.0247.1 Cross Slope (PAR)SF21249.1to $120 $2,52014940111ft
feet 5.0-6.0251.1 Cross Slope (PAR)SF20253.0to $120 $2,39414940211ft
feet 2.0-3.0254.9 Cross Slope (PAR)SF23257.1to $120 $2,77214940311ft
feet 2.0-3.0265.2 Cross Slope (PAR)SF83273.1to $120 $9,95414940411ft
feet 4.0-5.0277.0 Cross Slope (PAR)SF109287.4to $120 $13,10414940511ft
feet287.7 Driveway313.0to165316
feet .71302.7 Vertical Change REF11303.7to136238 11 ft
feet 3.0-4.0313.2 Cross Slope (Driveway)SF70319.9to $40 $2,81414940611ft
feet 2.0-3.0319.9 Cross Slope (PAR)SF193338.3to $120 $23,18414940711ft
feet 4.0-5.0340.1 Cross Slope (PAR)SF29342.9to $120 $3,52814940811ft
feet .29343.9 Vertical Change LF11344.9to $75 $78813623911ft
feet 5.0-6.0347.4 Cross Slope (PAR)SF20349.3to $120 $2,39414940911ft
feet 3.0-4.0350.5 Cross Slope (PAR)SF11351.5to $120 $1,26014941011ft
feet 3.0-4.0354.0 Cross Slope (PAR)SF87362.3to $120 $10,45814941111ft
feet 2.0-3.0362.3 Cross Slope (PAR)SF194380.8to $120 $23,31014941211ft
feet381.4 Driveway409.8to165317
feet381.4 Driveway466.4to165318
feet 3.0-4.0409.8 Cross Slope (Driveway)SF77417.1to $40 $3,06614941311ft
feet 5.0-6.0417.1 Cross Slope (Driveway)SF39420.8to $40 $1,55414941411ft
feet .42417.4 Vertical Change REF11418.4to136240 11 ft
feet 2.0-3.0422.6 Cross Slope (Driveway)SF86430.8to $40 $3,44414941511ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
627
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S / SW DISTRICT BLVD
Street Side
CORONA AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912190855
Run ID
District Blvd
70
ID Sidewalk Width
Priority
feet 1.01424.8 Vertical Change REF11425.8to136241 11 ft
feet 4.0-5.0431.1 Cross Slope (Driveway)SF76438.3to $40 $3,02414941611ft
feet 2.0-3.0442.8 Cross Slope (Driveway)SF17444.4to $40 $67214941711ft
$266,710.50TOTAL COST FOR:DISTRICT BLVDS /
SW
side of Starting at:CORONA AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
628
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
E 49TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912190910
Run ID
District Blvd
49
ID Sidewalk Width
Priority
feet 2.0-3.00.1 Cross Slope (PAR)SF414.3to $120 $4,91414931110ft
feet 2.0-3.06.4 Cross Slope (PAR)SF137.7to $120 $1,52114931210ft
feet 3.159.6 Vertical Change REF1010.6to136220 10 ft
feet 2.0-3.010.3 Cross Slope (PAR)SF5115.5to $120 $6,08414931310ft
feet29.5 Cold Patch 2031.5to140372 10 ft
feet .2731.0 Vertical Change LF1032.0to $75 $73113622110ft
feet 2.0-3.032.6 Cross Slope (PAR)SF3536.2to $120 $4,21214931410ft
feet -.4435.2 Vertical Change REF1036.2to136222 10 ft
feet 2.0-3.042.3 Cross Slope (PAR)SF27070.0to $120 $32,40914931510ft
feet70.4 Driveway96.5to165307
feet -.2680.9 Vertical Change REF1081.9to136223 10 ft
feet 3.0-4.098.8 Cross Slope (PAR)SF1099.8to $120 $1,17014931610ft
feet 3.0-4.0102.3 Cross Slope (PAR)SF11103.4to $120 $1,28714931710ft
feet 2.0-3.0110.8 Cross Slope (PAR)SF74118.4to $120 $8,89214931810ft
feet 2.0-3.0122.5 Cross Slope (PAR)SF40126.6to $120 $4,79714931910ft
feet 2.0-3.0129.4 Cross Slope (PAR)SF293159.5to $120 $35,21714932010ft
feet160.3 Driveway185.8to165308
feet160.3 Driveway232.7to165309
feet 2.0-3.0186.8 Cross Slope (Driveway)SF41191.0to $40 $1,63814932110ft
feet 4.0-5.0191.0 Cross Slope (Driveway)SF23193.4to $40 $93614932210ft
feet 2.0-3.0194.3 Cross Slope (Driveway)SF113205.9to $40 $4,52414932310ft
feet 2.0-3.0226.9 Cross Slope (Driveway)SF35230.5to $40 $1,40414932410ft
$109,736.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:E 49TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
629
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
E 50TH ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912190918
Run ID
District Blvd
78
ID Sidewalk Width
Priority
feet 3.0-4.00.6 Cross Slope (PAR)SF192.5to $120 $2,22314926910ft
feet 3.0-4.06.8 Cross Slope (PAR)SF7014.0to $120 $8,42414927010ft
feet12.2 Continuous Width REF1013.2to167803 10 ft
feet 2.0-3.014.5 Cross Slope (PAR)SF4018.6to $120 $4,79714927110ft
feet 4.0-5.019.5 Cross Slope (PAR)SF8528.2to $120 $10,17914927210ft
feet 2.0-3.030.1 Cross Slope (PAR)SF2132.3to $120 $2,57414927310ft
feet 4.0-5.032.3 Cross Slope (PAR)SF11744.3to $120 $14,04014927410ft
feet 2.0-3.044.4 Cross Slope (PAR)SF4448.9to $120 $5,26514927510ft
feet 4.0-5.048.9 Cross Slope (PAR)SF6255.3to $120 $7,48814927610ft
feet 2.0-3.058.1 Cross Slope (PAR)SF1159.2to $120 $1,28714927710ft
feet 2.0-3.080.5 Cross Slope (PAR)SF2683.2to $120 $3,15914927810ft
feet 2.0-3.0111.8 Cross Slope (PAR)SF73119.3to $120 $8,77514927910ft
feet 2.0-3.0122.8 Cross Slope (PAR)SF14124.2to $120 $1,63814928010ft
feet 4.0-5.0136.5 Cross Slope (PAR)SF11137.6to $120 $1,28714928110ft
feet182.3 Driveway211.3to165306
feet .38210.2 Vertical Change REF10211.2to136214 10 ft
feet 5.0-6.0212.3 Cross Slope (PAR)SF100222.6to $120 $12,05114928210ft
feet .3213.9 Vertical Change REF10214.9to136215 10 ft
feet 1.01216.3 Vertical Change REF10217.3to136216 10 ft
feet 3.0-4.0222.6 Cross Slope (PAR)SF11223.7to $120 $1,28714928310ft
feet 2.0-3.0224.5 Cross Slope (PAR)SF72231.9to $120 $8,65814928410ft
feet 3.0-4.0234.3 Cross Slope (PAR)SF63240.8to $120 $7,60514928510ft
feet 2.0-3.0240.8 Cross Slope (PAR)SF16242.4to $120 $1,87214928610ft
feet 2.0-3.0246.3 Cross Slope (PAR)SF19248.2to $120 $2,22314928710ft
$104,832.00TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:E 50TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
630
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
EVERETT AVE
Survey Street Name Starting Street Name
S MAYWOOD AVE
End Street Name
1912181635
Run ID
District Blvd
62
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF252.6to $120 $2,96414954710ft
feet 2.0-3.03.8 Cross Slope (PAR)SF9513.8to $120 $11,40014954810ft
feet 3.0-4.017.7 Cross Slope (PAR)SF5323.3to $120 $6,38414954910ft
feet 2.0-3.024.0 Cross Slope (PAR)SF1525.6to $120 $1,82414955010ft
feet 2.0-3.035.8 Cross Slope (PAR)SF1036.8to $120 $1,14014955110ft
feet 2.0-3.048.6 Cross Slope (PAR)SF6355.2to $120 $7,52414955210ft
feet 2.0-3.060.6 Cross Slope (PAR)SF2663.3to $120 $3,07814955310ft
feet 2.0-3.0106.3 Cross Slope (PAR)SF81114.8to $120 $9,69014955410ft
feet 2.0-3.0137.3 Cross Slope (PAR)SF76145.3to $120 $9,12014955510ft
feet 2.0-3.0149.0 Cross Slope (PAR)SF10150.0to $120 $1,14014955610ft
feet 2.0-3.0153.7 Cross Slope (PAR)SF28156.6to $120 $3,30614955710ft
feet 2.0-3.0162.7 Cross Slope (PAR)SF51168.1to $120 $6,15614955810ft
feet 2.0-3.0181.8 Cross Slope (PAR)SF112193.6to $120 $13,45214955910ft
feet195.6 Driveway214.5to165328
feet 3.0-4.0214.5 Cross Slope (Driveway)SF45219.2to $40 $1,78614956010ft
feet 5.0-6.0219.2 Cross Slope (PAR)SF43223.7to $120 $5,13014956110ft
feet 2.0-3.0224.4 Cross Slope (PAR)SF13225.8to $120 $1,59614956210ft
feet 3.0-4.0231.3 Cross Slope (PAR)SF35235.0to $120 $4,21814956310ft
feet 2.0-3.0235.0 Cross Slope (PAR)SF205256.6to $120 $24,62414956410ft
feet -.33236.8 Vertical Change REF10237.8to136261 10 ft
feet 4.0-5.0259.6 Cross Slope (PAR)SF40263.8to $120 $4,78814956510ft
feet 2.0-3.0263.8 Cross Slope (PAR)SF199284.7to $120 $23,82614956610ft
feet 3.0-4.0291.2 Cross Slope (PAR)SF56297.1to $120 $6,72614956710ft
feet 2.0-3.0297.1 Cross Slope (PAR)SF14298.6to $120 $1,71014956810ft
feet 2.0-3.0301.2 Cross Slope (PAR)SF48306.3to $120 $5,81414956910ft
feet 2.0-3.0309.7 Cross Slope (PAR)SF148325.3to $120 $17,78414957010ft
feet326.0 Driveway350.1to165329
feet 2.0-3.0357.0 Cross Slope (PAR)SF25359.6to $120 $2,96414957110ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
631
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
EVERETT AVE
Survey Street Name Starting Street Name
S MAYWOOD AVE
End Street Name
1912181635
Run ID
District Blvd
62
ID Sidewalk Width
Priority
feet .33362.1 Vertical Change LF10363.1to $75 $71313626210ft
feet 2.0-3.0363.6 Cross Slope (PAR)SF35367.3to $120 $4,21814957210ft
feet368.0 Driveway394.4to165330
feet -.3397.0 Vertical Change REF10398.0to136263 10 ft
feet 3.0-4.0397.9 Cross Slope (PAR)SF16399.6to $120 $1,93814957310ft
feet 2.0-3.0399.8 Cross Slope (PAR)SF21402.0to $120 $2,50814957410ft
feet .43403.2 Vertical Change LF10404.2to $75 $71313626410ft
feet 2.0-3.0410.3 Cross Slope (PAR)SF13411.7to $120 $1,59614957510ft
feet -.29413.1 Vertical Change LF10414.1to $75 $71313626510ft
feet 3.0-4.0418.4 Cross Slope (PAR)SF37422.3to $120 $4,44614957610ft
feet 2.0-3.0428.2 Cross Slope (PAR)SF67435.3to $120 $8,09414957710ft
feet 4.0-5.0436.9 Cross Slope (PAR)SF47441.8to $120 $5,58614957810ft
feet 2.0-3.0447.6 Cross Slope (PAR)SF21449.8to $120 $2,50814957910ft
feet 5.0-6.0451.2 Cross Slope (PAR)SF39455.3to $120 $4,67414958010ft
feet -.29456.2 Vertical Change LF10457.2to $75 $71313626610ft
feet 5.0-6.0459.2 Cross Slope (PAR)SF61465.6to $120 $7,29614958110ft
feet 3.0-4.0465.8 Cross Slope (PAR)SF42470.2to $120 $5,01614958210ft
feet 2.0-3.0473.5 Cross Slope (PAR)SF11474.7to $120 $1,36814958310ft
feet .31477.0 Vertical Change LF10478.0to $75 $71313626710ft
feet 2.0-3.0483.3 Cross Slope (PAR)SF51488.7to $120 $6,15614958410ft
feet 3.0-4.0494.3 Cross Slope (PAR)SF19496.3to $120 $2,28014958510ft
feet 4.0-5.0498.7 Cross Slope (PAR)SF13500.1to $120 $1,59614958610ft
feet 2.0-3.0502.6 Cross Slope (PAR)SF33506.1to $120 $3,99014958710ft
feet 2.0-3.0508.5 Cross Slope (PAR)SF13509.9to $120 $1,59614958810ft
feet 2.0-3.0515.6 Cross Slope (PAR)SF10516.7to $120 $1,25414958910ft
feet 2.0-3.0518.9 Cross Slope (PAR)SF12520.2to $120 $1,48214959010ft
feet 3.0-4.0524.3 Cross Slope (PAR)SF19526.3to $120 $2,28014959110ft
feet 2.0-3.0526.6 Cross Slope (PAR)SF10527.7to $120 $1,25414959210ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
632
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
EVERETT AVE
Survey Street Name Starting Street Name
S MAYWOOD AVE
End Street Name
1912181635
Run ID
District Blvd
62
ID Sidewalk Width
Priority
$252,842.50TOTAL COST FOR:DISTRICT BLVDNside of Starting at:EVERETT AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
633
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
EVERETT AVE
Survey Street Name Starting Street Name
LOMA VISTA AVE
End Street Name
1912181615
Run ID
District Blvd
59.5
ID Sidewalk Width
Priority
feet 2.0-3.03.8 Cross Slope (PAR)SF10514.6to $120 $12,63614964210ft
feet 3.0523.3 Vertical Change SF1024.3to $75 $73113627810ft
feet 2.0-3.033.8 Cross Slope (PAR)SF3837.7to $120 $4,56314964310ft
feet 4.0-5.037.7 Cross Slope (PAR)SF5042.8to $120 $5,96714964410ft
feet42.8 Cold Patch 3546.4to140377 10 ft
feet 3.0-4.046.4 Cross Slope (PAR)SF2749.2to $120 $3,27614964510ft
feet 2.0-3.050.1 Cross Slope (PAR)SF1151.2to $120 $1,28714964610ft
feet 2.0-3.053.3 Cross Slope (PAR)SF18572.3to $120 $22,23014964710ft
feet 2.0-3.074.6 Cross Slope (PAR)SF4879.5to $120 $5,73314964810ft
feet 3.0-4.084.3 Cross Slope (PAR)SF1585.8to $120 $1,75514964910ft
feet 2.0-3.087.5 Cross Slope (PAR)SF203108.3to $120 $24,33614965010ft
feet 2.0-3.0113.4 Cross Slope (PAR)SF198133.7to $120 $23,75114965110ft
feet136.4 Cold Patch 43140.8to140378 10 ft
feet 3.0-4.0143.3 Cross Slope (PAR)SF15144.8to $120 $1,75514965210ft
feet 2.0-3.0144.8 Cross Slope (PAR)SF58150.7to $120 $6,90314965310ft
feet151.2 Cold Patch 22153.5to140379 10 ft
feet 2.0-3.0163.8 Cross Slope (PAR)SF104174.5to $120 $12,51914965410ft
feet 4.0-5.0174.5 Cross Slope (PAR)SF245199.6to $120 $29,36714965510ft
feet 2.0-3.0201.9 Cross Slope (PAR)SF253227.8to $120 $30,30314965610ft
feet228.4 Driveway274.3to165333
feet 3.0-4.0275.6 Cross Slope (PAR)SF36279.3to $120 $4,32914965710ft
feet 5.0-6.0281.2 Cross Slope (PAR)SF40285.3to $120 $4,79714965810ft
feet 3.0-4.0285.3 Cross Slope (PAR)SF10286.3to $120 $1,17014965910ft
feet 2.0-3.0287.1 Cross Slope (PAR)SF10288.1to $120 $1,17014966010ft
feet 2.0-3.0291.1 Cross Slope (PAR)SF41295.3to $120 $4,91414966110ft
feet295.3 Driveway330.3to165334
feet 2.0-3.0331.1 Cross Slope (PAR)SF74338.7to $120 $8,89214966210ft
feet 3.0-4.0345.2 Cross Slope (PAR)SF37349.0to $120 $4,44614966310ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
634
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
EVERETT AVE
Survey Street Name Starting Street Name
LOMA VISTA AVE
End Street Name
1912181615
Run ID
District Blvd
59.5
ID Sidewalk Width
Priority
feet 3.0-4.0353.3 Cross Slope (PAR)SF91362.6to $120 $10,88114966410ft
feet 2.0-3.0362.6 Cross Slope (PAR)SF13363.9to $120 $1,52114966510ft
feet 2.0-3.0366.0 Cross Slope (PAR)SF25368.6to $120 $3,04214966610ft
feet 4.0-5.0369.3 Cross Slope (PAR)SF27372.1to $120 $3,27614966710ft
feet 2.0-3.0373.0 Cross Slope (PAR)SF186392.1to $120 $22,34714966810ft
feet 3.0-4.0394.2 Cross Slope (PAR)SF37398.0to $120 $4,44614966910ft
feet398.9 Driveway429.7to165335
feet 3.0-4.0429.9 Cross Slope (Driveway)SF198450.2to $40 $7,91714967010ft
feet 2.0-3.0451.0 Cross Slope (PAR)SF15452.5to $120 $1,75514967110ft
feet 3.0-4.0464.3 Cross Slope (PAR)SF141478.8to $120 $16,96514967210ft
feet 2.0-3.0478.8 Cross Slope (PAR)SF12480.0to $120 $1,40414967310ft
feet 3.0-4.0483.7 Cross Slope (PAR)SF84492.3to $120 $10,06214967410ft
feet 2.0-3.0502.3 Cross Slope (PAR)SF146517.3to $120 $17,55014967510ft
feet 2.0-3.0520.6 Cross Slope (PAR)SF23523.0to $120 $2,80814967610ft
feet529.9 Driveway558.6to165336
feet .29533.9 Vertical Change REF10534.9to136280 10 ft
feet 2.0-3.0564.0 Cross Slope (PAR)SF62570.4to $120 $7,48814967710ft
feet 2.0-3.0574.8 Cross Slope (PAR)SF30577.9to $120 $3,62714967810ft
feet 2.0-3.0581.4 Cross Slope (PAR)SF38585.3to $120 $4,56314967910ft
feet 2.0-3.0587.8 Cross Slope (PAR)SF149603.1to $120 $17,90114968010ft
feet 2.0-3.0614.4 Cross Slope (PAR)SF92623.8to $120 $10,99814968110ft
feet 2.0-3.0625.9 Cross Slope (PAR)SF15627.4to $120 $1,75514968210ft
feet 3.0-4.0630.6 Cross Slope (PAR)SF104641.3to $120 $12,51914968310ft
feet643.2 Driveway693.1to165337
feet 2.0-3.0693.1 Cross Slope (Driveway)SF50698.2to $40 $1,98914968410ft
feet 1.24718.6 Vertical Change REF10719.6to136281 10 ft
feet 3.0-4.0719.4 Cross Slope (PAR)SF34722.9to $120 $4,09514968510ft
feet 2.0-3.0726.7 Cross Slope (PAR)SF144741.5to $120 $17,31614968610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
635
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
EVERETT AVE
Survey Street Name Starting Street Name
LOMA VISTA AVE
End Street Name
1912181615
Run ID
District Blvd
59.5
ID Sidewalk Width
Priority
feet .32734.0 Vertical Change REF10735.0to136282 10 ft
feet 4.0-5.0741.5 Cross Slope (PAR)SF127754.5to $120 $15,21014968710ft
feet 2.0-3.0754.5 Cross Slope (PAR)SF17756.2to $120 $1,98914968810ft
feet 2.0-3.0760.9 Cross Slope (PAR)SF37764.7to $120 $4,44614968910ft
feet 4.0-5.0764.7 Cross Slope (PAR)SF40768.8to $120 $4,79714969010ft
feet 2.0-3.0768.8 Cross Slope (PAR)SF62775.2to $120 $7,48814969110ft
feet 4.0-5.0775.2 Cross Slope (PAR)SF26777.9to $120 $3,15914969210ft
feet 2.0-3.0777.9 Cross Slope (PAR)SF15779.4to $120 $1,75514969310ft
feet 2.0-3.0781.8 Cross Slope (PAR)SF28784.7to $120 $3,39314969410ft
feet 2.65782.0 Vertical Change REF10783.0to136283 10 ft
feet 3.0-4.0793.0 Cross Slope (PAR)SF139807.3to $120 $16,73114969510ft
feet 2.0-3.0808.3 Cross Slope (PAR)SF25810.9to $120 $3,04214969610ft
feet 2.0-3.0814.9 Cross Slope (PAR)SF56820.6to $120 $6,66914969710ft
$471,734.25TOTAL COST FOR:DISTRICT BLVDSside of Starting at:EVERETT AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
636
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
1912191033
Run ID
District Blvd
67
ID Sidewalk Width
Priority
feet 4.0-5.01.4 Cross Slope (PAR)SF7719.5to $120 $9,2311490674ft
feet13.4 Continuous Width REF414.4to167244 4 ft
feet 2.0-3.019.8 Cross Slope (PAR)SF3628.3to $120 $4,3351490684ft
feet20.7 Continuous Width REF421.7to167775 4 ft
feet .3229.9 Vertical Change REF430.9to136156 4 ft
feet 4.0-5.030.1 Cross Slope (PAR)SF6645.7to $120 $7,9561490694ft
feet 2.0-3.047.1 Cross Slope (PAR)SF2252.2to $120 $2,6011490704ft
feet49.1 Continuous Width REF450.1to167245 4 ft
feet .453.5 Vertical Change REF454.5to136157 4 ft
feet 4.0-5.053.8 Cross Slope (PAR)SF655.3to $120 $7651490714ft
feet 2.0-3.056.7 Cross Slope (PAR)SF658.1to $120 $7141490724ft
feet57.3 Continuous Width SF458.3to $120 $5101676214ft
feet -.3557.6 Vertical Change REF458.6to136158 4 ft
feet58.1 Cold Patch 1160.6to140361 4 ft
feet 3.0-4.063.3 Cross Slope (PAR)SF10287.3to $120 $12,2401490734ft
feet 4.0-5.090.5 Cross Slope (PAR)SF68106.5to $120 $8,1601490744ft
feet95.7 Continuous Width SF496.7to $120 $5101675214ft
feet 2.0-3.0107.3 Cross Slope (PAR)SF13110.4to $120 $1,5811490754ft
feet 3.0-4.0116.5 Cross Slope (PAR)SF102140.5to $120 $12,2401490764ft
feet130.8 Continuous Width SF4131.8to $120 $5101671184ft
feet 3.0-4.0145.2 Cross Slope (PAR)SF12148.0to $120 $1,4281490774ft
feet 2.0-3.0151.1 Cross Slope (PAR)SF27157.4to $120 $3,2131490784ft
feet 4.0-5.0157.4 Cross Slope (PAR)SF20162.0to $120 $2,3461490794ft
feet 3.0-4.0164.2 Cross Slope (PAR)SF200211.3to $120 $24,0211490804ft
feet181.0 Continuous Width SF4182.0to $120 $5101671194ft
feet 3.29211.7 Vertical Change SF4212.7to $75 $3191361594ft
feet 2.0-3.0213.6 Cross Slope (PAR)SF43223.6to $120 $5,1001490814ft
feet 2.0-3.0225.8 Cross Slope (PAR)SF34233.9to $120 $4,1311490824ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
637
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
FRUITLAND AVE
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
1912191033
Run ID
District Blvd
67
ID Sidewalk Width
Priority
feet 2.0-3.0240.3 Cross Slope (PAR)SF6241.7to $120 $7141490834ft
feet 4.0-5.0243.8 Cross Slope (PAR)SF14247.1to $120 $1,6831490844ft
feet244.9 Continuous Width SF4245.9to $120 $5101678354ft
feet 2.0-3.0250.6 Cross Slope (PAR)SF15254.1to $120 $1,7851490854ft
feet 2.0-3.0256.3 Cross Slope (PAR)SF6257.6to $120 $6631490864ft
feet 4.0-5.0258.6 Cross Slope (PAR)SF5259.8to $120 $6121490874ft
feet 4.0-5.0263.4 Cross Slope (PAR)SF34271.3to $120 $4,0291490884ft
feet .42265.8 Vertical Change REF4266.8to136160 4 ft
feet 2.0-3.0273.4 Cross Slope (PAR)SF31280.6to $120 $3,6721490894ft
feet276.9 Continuous Width REF4277.9to167215 4 ft
feet287.1 Cold Patch 433389.0to140362 4 ft
feet .27308.8 Vertical Change LF4309.8to $75 $3191361624ft
feet -.27330.8 Vertical Change LF4331.8to $75 $3191361634ft
feet .36332.7 Vertical Change LF4333.7to $75 $3191361644ft
feet .28339.9 Vertical Change LF4340.9to $75 $3191361664ft
feet -.29342.8 Vertical Change LF4343.8to $75 $3191361674ft
feet .53359.2 Vertical Change SF4360.2to $75 $3191361684ft
feet 1.37365.2 Vertical Change SF4366.2to $75 $3191361694ft
feet .31372.5 Vertical Change LF4373.5to $75 $3191361704ft
feet .29385.0 Vertical Change LF4386.0to $75 $3191361714ft
$118,957.50TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:FRUITLAND AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
638
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
GIFFORD AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912190903
Run ID
District Blvd
46
ID Sidewalk Width
Priority
feet 2.0-3.00.6 Cross Slope (PAR)SF131.9to $120 $1,52114934010ft
feet 2.0-3.04.4 Cross Slope (PAR)SF267.1to $120 $3,15914934110ft
feet 2.0-3.013.8 Cross Slope (PAR)SF1815.6to $120 $2,10614934210ft
feet 2.0-3.043.8 Cross Slope (PAR)SF3147.0to $120 $3,74414934310ft
feet 4.0-5.047.0 Cross Slope (PAR)SF8155.3to $120 $9,71114934410ft
feet 2.0-3.055.6 Cross Slope (PAR)SF1256.8to $120 $1,40414934510ft
feet 2.0-3.058.9 Cross Slope (PAR)SF6966.0to $120 $8,30714934610ft
feet 2.0-3.071.6 Cross Slope (PAR)SF4576.2to $120 $5,38214934710ft
feet .4986.5 Vertical Change REF1087.5to136228 10 ft
feet 2.0-3.087.0 Cross Slope (PAR)SF2089.0to $120 $2,34014934810ft
feet 2.0-3.099.4 Cross Slope (PAR)SF87108.3to $120 $10,41314934910ft
feet 2.0-3.0114.7 Cross Slope (PAR)SF16116.3to $120 $1,87214935010ft
feet 2.0-3.0118.5 Cross Slope (PAR)SF45123.1to $120 $5,38214935110ft
feet 2.0-3.0130.9 Cross Slope (PAR)SF52136.2to $120 $6,20114935210ft
feet .32137.5 Vertical Change LF10138.5to $75 $73113622910ft
feet 3.0-4.0140.5 Cross Slope (PAR)SF36144.2to $120 $4,32914935310ft
feet 2.0-3.0146.8 Cross Slope (PAR)SF63153.3to $120 $7,60514935410ft
feet 3.0-4.0168.8 Cross Slope (PAR)SF27171.6to $120 $3,27614935510ft
feet171.6 Driveway201.5to165311
feet171.6 Driveway228.6to165312
feet 3.2175.1 Vertical Change REF10176.1to136230 10 ft
feet 4.0-5.0201.5 Cross Slope (Driveway)SF31204.7to $40 $1,24814935610ft
feet 2.0-3.0206.1 Cross Slope (Driveway)SF21208.3to $40 $85814935710ft
feet 2.0-3.0210.8 Cross Slope (Driveway)SF24213.3to $40 $97514935810ft
feet 3.43217.9 Vertical Change REF10218.9to136231 10 ft
feet 2.0-3.0219.4 Cross Slope (Driveway)SF84228.0to $40 $3,35414935910ft
$83,918.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:GIFFORD AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
639
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
HELIOTROPE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001280948
Run ID
District Blvd
41.5
ID Sidewalk Width
Priority
feet 3.0-4.00.5 Cross Slope (PAR)SF164.5to $120 $1,9201636564ft
feet 2.0-3.04.5 Cross Slope (PAR)SF2711.3to $120 $3,2641636574ft
feet -.2813.4 Vertical Change LF414.4to $75 $3001399854ft
feet 2.0-3.019.6 Cross Slope (PAR)SF5733.8to $120 $6,8161636584ft
feet34.8 Driveway93.6to166359
feet .2894.6 Vertical Change LF495.6to $75 $3001399864ft
feet 4.0-5.097.8 Cross Slope (PAR)SF17102.1to $120 $2,0641636594ft
feet 6.0-7.0104.8 Cross Slope (PAR)SF5106.0to $120 $5761636604ft
feet 5.0-6.0106.0 Cross Slope (PAR)SF6107.6to $120 $7681636614ft
feet .54109.8 Vertical Change SF4110.8to $75 $3001399874ft
feet 2.0-3.0111.1 Cross Slope (PAR)SF18115.7to $120 $2,2081636624ft
feet 4.0-5.0115.7 Cross Slope (PAR)SF36124.8to $120 $4,3681636634ft
feet124.8 Driveway158.9to166360
feet -.29146.5 Vertical Change REF4147.5to139988 4 ft
$22,884.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:HELIOTROPE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
640
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
LOMA VISTA AVE
Survey Street Name Starting Street Name
EVERETT AVE
End Street Name
1912181624
Run ID
District Blvd
75
ID Sidewalk Width
Priority
feet 2.0-3.00.5 Cross Slope (PAR)SF222.8to $120 $2,62214959310ft
feet .355.0 Vertical Change LF106.0to $75 $71313626810ft
feet 2.0-3.06.3 Cross Slope (PAR)SF4911.5to $120 $5,92814959410ft
feet 3.0-4.025.7 Cross Slope (PAR)SF3729.6to $120 $4,44614959510ft
feet 2.0-3.029.6 Cross Slope (PAR)SF29660.8to $120 $35,56814959610ft
feet 2.0-3.067.3 Cross Slope (PAR)SF18787.0to $120 $22,45814959710ft
feet 2.0869.2 Vertical Change REF1070.2to136270 10 ft
feet .6285.8 Vertical Change REF1086.8to136271 10 ft
feet 4.0-5.087.0 Cross Slope (PAR)SF3891.0to $120 $4,56014959810ft
feet 3.3390.4 Vertical Change REF1091.4to136272 10 ft
feet 2.0-3.091.0 Cross Slope (PAR)SF3094.2to $120 $3,64814959910ft
feet 3.5594.5 Vertical Change SF1095.5to $75 $71313627310ft
feet 2.0-3.097.9 Cross Slope (PAR)SF1099.0to $120 $1,25414960010ft
feet 2.0-3.0103.1 Cross Slope (PAR)SF29106.2to $120 $3,53414960110ft
feet 4.0-5.0107.5 Cross Slope (PAR)SF17109.3to $120 $2,05214960210ft
feet 3.0-4.0111.4 Cross Slope (PAR)SF13112.8to $120 $1,59614960310ft
feet 2.0-3.0112.8 Cross Slope (PAR)SF12114.1to $120 $1,48214960410ft
feet 2.0-3.0121.4 Cross Slope (PAR)SF28124.3to $120 $3,30614960510ft
feet 2.0-3.0129.4 Cross Slope (PAR)SF140144.1to $120 $16,75814960610ft
feet 3.0-4.0146.4 Cross Slope (PAR)SF18148.3to $120 $2,16614960710ft
feet 3.0-4.0150.6 Cross Slope (PAR)SF12151.9to $120 $1,48214960810ft
feet 2.0-3.0151.9 Cross Slope (PAR)SF55157.7to $120 $6,61214960910ft
feet 3.0-4.0162.0 Cross Slope (PAR)SF84170.8to $120 $10,03214961010ft
feet 2.0-3.0170.8 Cross Slope (PAR)SF10171.8to $120 $1,14014961110ft
feet176.4 Driveway200.8to165331
feet 2.0-3.0201.8 Cross Slope (PAR)SF17203.6to $120 $2,05214961210ft
feet 3.0-4.0209.1 Cross Slope (PAR)SF36212.9to $120 $4,33214961310ft
feet 2.0-3.0213.3 Cross Slope (PAR)SF90222.8to $120 $10,83014961410ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
641
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
LOMA VISTA AVE
Survey Street Name Starting Street Name
EVERETT AVE
End Street Name
1912181624
Run ID
District Blvd
75
ID Sidewalk Width
Priority
feet 2.0-3.0230.6 Cross Slope (PAR)SF49235.8to $120 $5,92814961510ft
feet 2.0-3.0240.8 Cross Slope (PAR)SF194261.2to $120 $23,25614961610ft
feet255.8 Continuous Width SF10256.8to $120 $1,14016729610ft
feet 4.0-5.0261.2 Cross Slope (PAR)SF12262.5to $120 $1,48214961710ft
feet -.38272.6 Vertical Change LF10273.6to $75 $71313627410ft
feet .39300.4 Vertical Change LF10301.4to $75 $71313627510ft
feet301.4 Continuous Width SF10302.4to $120 $1,14016729710ft
feet 2.0-3.0311.8 Cross Slope (PAR)SF36315.6to $120 $4,33214961810ft
feet 3.0-4.0327.2 Cross Slope (PAR)SF13328.6to $120 $1,59614961910ft
feet 2.0-3.0329.3 Cross Slope (PAR)SF129342.9to $120 $15,50414962010ft
feet 4.0-5.0342.9 Cross Slope (PAR)SF88352.2to $120 $10,60214962110ft
feet 2.0-3.0352.3 Cross Slope (PAR)SF60358.6to $120 $7,18214962210ft
feet 1.35357.8 Vertical Change REF10358.8to136276 10 ft
feet 4.0-5.0358.6 Cross Slope (PAR)SF290389.1to $120 $34,77014962310ft
feet 3.0-4.0391.3 Cross Slope (PAR)SF67398.3to $120 $7,98014962410ft
feet 2.0-3.0399.2 Cross Slope (PAR)SF53404.8to $120 $6,38414962510ft
feet 2.0-3.0407.9 Cross Slope (PAR)SF57413.9to $120 $6,84014962610ft
feet 3.0-4.0416.1 Cross Slope (PAR)SF20418.2to $120 $2,39414962710ft
feet 2.0-3.0418.2 Cross Slope (PAR)SF74426.0to $120 $8,89214962810ft
feet426.8 Driveway447.7to165332
feet 5.0-6.0448.7 Cross Slope (PAR)SF67455.7to $120 $7,98014962910ft
feet 3.0-4.0455.7 Cross Slope (PAR)SF17457.5to $120 $2,05214963010ft
feet 7.0-8.0459.5 Cross Slope (PAR)SF29462.5to $120 $3,42014963110ft
feet 6.0-7.0464.8 Cross Slope (PAR)SF14466.3to $120 $1,71014963210ft
feet 5.0-6.0466.3 Cross Slope (PAR)SF29469.3to $120 $3,42014963310ft
feet 3.0-4.0469.3 Cross Slope (PAR)SF63475.9to $120 $7,52414963410ft
feet 5.0-6.0475.9 Cross Slope (PAR)SF32479.3to $120 $3,87614963510ft
feet 3.0-4.0479.3 Cross Slope (PAR)SF57485.3to $120 $6,84014963610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
642
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
LOMA VISTA AVE
Survey Street Name Starting Street Name
EVERETT AVE
End Street Name
1912181624
Run ID
District Blvd
75
ID Sidewalk Width
Priority
feet 5.0-6.0485.3 Cross Slope (PAR)SF47490.2to $120 $5,58614963710ft
feet 4.0-5.0494.2 Cross Slope (PAR)SF88503.5to $120 $10,60214963810ft
feet 2.0-3.0505.3 Cross Slope (PAR)SF18507.2to $120 $2,16614963910ft
feet .36513.1 Vertical Change REF10514.1to136277 10 ft
feet 4.0-5.0513.4 Cross Slope (PAR)SF13514.8to $120 $1,59614964010ft
feet 5.0-6.0517.3 Cross Slope (PAR)SF89526.7to $120 $10,71614964110ft
$357,618.00TOTAL COST FOR:DISTRICT BLVDNside of Starting at:LOMA VISTA AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
643
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
LOMA VISTA AVE
Survey Street Name Starting Street Name
CORONA AVE
End Street Name
1912190848
Run ID
District Blvd
74
ID Sidewalk Width
Priority
feet 2.0-3.03.3 Cross Slope (PAR)SF21124.9to $120 $25,27214941810ft
feet 2.0-3.028.8 Cross Slope (PAR)SF9738.8to $120 $11,70014941910ft
feet 2.0-3.058.3 Cross Slope (PAR)SF1159.4to $120 $1,28714942010ft
feet 3.0-4.078.1 Cross Slope (PAR)SF3081.2to $120 $3,62714942110ft
feet 2.0-3.084.0 Cross Slope (PAR)SF183102.8to $120 $21,99614942210ft
feet 3.4987.8 Vertical Change REF1088.8to136242 10 ft
feet 4.0-5.0102.8 Cross Slope (PAR)SF29105.8to $120 $3,51014942310ft
feet 2.0-3.0106.2 Cross Slope (PAR)SF34109.7to $120 $4,09514942410ft
feet 4.0-5.0109.7 Cross Slope (PAR)SF140124.1to $120 $16,84814942510ft
feet 2.0-3.0125.3 Cross Slope (PAR)SF11126.4to $120 $1,28714942610ft
feet132.0 Driveway181.8to165319
feet 2.0-3.0181.8 Cross Slope (Driveway)SF20183.8to $40 $78014942710ft
feet 4.0-5.0184.7 Cross Slope (PAR)SF123197.3to $120 $14,74214942810ft
feet 3.63192.3 Vertical Change REF10193.3to136243 10 ft
feet 3.0-4.0201.3 Cross Slope (PAR)SF29204.3to $120 $3,51014942910ft
feet 3.0-4.0210.4 Cross Slope (PAR)SF184229.3to $120 $22,11314943010ft
feet 2.0-3.0229.3 Cross Slope (PAR)SF12230.5to $120 $1,40414943110ft
feet 4.0-5.0233.6 Cross Slope (PAR)SF18235.4to $120 $2,10614943210ft
feet 2.0-3.0236.8 Cross Slope (PAR)SF53242.2to $120 $6,31814943310ft
feet 2.0-3.0254.5 Cross Slope (PAR)SF14255.9to $120 $1,63814943410ft
feet 4.0-5.0257.7 Cross Slope (PAR)SF53263.1to $120 $6,31814943510ft
feet .65259.3 Vertical Change SF10260.3to $75 $73113624510ft
feet 2.0-3.0264.1 Cross Slope (PAR)SF36267.8to $120 $4,32914943610ft
feet268.5 Cold Patch 33271.9to140375 10 ft
feet -.36269.9 Vertical Change LF10270.9to $75 $73113624610ft
feet 2.0-3.0271.9 Cross Slope (PAR)SF10272.9to $120 $1,17014943710ft
feet 3.0-4.0275.6 Cross Slope (PAR)SF94285.2to $120 $11,23214943810ft
feet 3.0-4.0289.7 Cross Slope (PAR)SF12290.9to $120 $1,40414943910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
644
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
LOMA VISTA AVE
Survey Street Name Starting Street Name
CORONA AVE
End Street Name
1912190848
Run ID
District Blvd
74
ID Sidewalk Width
Priority
feet -.31297.0 Vertical Change LF10298.0to $75 $73113624710ft
feet 3.0-4.0302.8 Cross Slope (PAR)SF64309.4to $120 $7,72214944010ft
feet 2.0-3.0310.1 Cross Slope (PAR)SF53315.5to $120 $6,31814944110ft
feet -.33310.4 Vertical Change REF10311.4to136248 10 ft
feet 2.0-3.0318.8 Cross Slope (PAR)SF47323.6to $120 $5,61614944210ft
feet 3.0-4.0326.4 Cross Slope (PAR)SF78334.4to $120 $9,36014944310ft
feet 3.0-4.0337.0 Cross Slope (PAR)SF34340.5to $120 $4,09514944410ft
feet 2.0-3.0341.8 Cross Slope (PAR)SF18343.6to $120 $2,10614944510ft
feet 2.0-3.0348.3 Cross Slope (PAR)SF159364.6to $120 $19,07114944610ft
feet 4.0-5.0374.7 Cross Slope (PAR)SF17376.4to $120 $1,98914944710ft
feet 3.0-4.0378.9 Cross Slope (PAR)SF29381.9to $120 $3,51014944810ft
feet 2.0-3.0385.8 Cross Slope (PAR)SF15387.3to $120 $1,75514944910ft
feet 3.0-4.0389.8 Cross Slope (PAR)SF14391.2to $120 $1,63814945010ft
feet 2.0-3.0391.8 Cross Slope (PAR)SF54397.3to $120 $6,43514945110ft
feet 2.0-3.0399.4 Cross Slope (PAR)SF16401.0to $120 $1,87214945210ft
feet 2.0-3.0403.5 Cross Slope (PAR)SF137417.6to $120 $16,49714945310ft
feet419.0 Driveway447.8to165320
feet 4.0-5.0448.3 Cross Slope (Driveway)SF34451.8to $40 $1,36514945410ft
feet 2.0-3.0452.3 Cross Slope (PAR)SF142466.9to $120 $17,08214945510ft
feet 4.0-5.0466.9 Cross Slope (PAR)SF31470.1to $120 $3,74414945610ft
feet 2.0-3.0471.5 Cross Slope (PAR)SF61477.8to $120 $7,37114945710ft
feet 3.0-4.0483.5 Cross Slope (PAR)SF13484.8to $120 $1,52114945810ft
feet 2.0-3.0484.8 Cross Slope (PAR)SF98494.8to $120 $11,70014945910ft
feet494.8 Driveway521.6to165321
feet .48520.1 Vertical Change REF10521.1to136249 10 ft
feet 3.0-4.0522.4 Cross Slope (Driveway)SF37526.2to $40 $1,48214946010ft
feet 2.0-3.0529.8 Cross Slope (PAR)SF15531.3to $120 $1,75514946110ft
feet 2.0-3.0540.3 Cross Slope (PAR)SF71547.6to $120 $8,54114946210ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
645
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
LOMA VISTA AVE
Survey Street Name Starting Street Name
CORONA AVE
End Street Name
1912190848
Run ID
District Blvd
74
ID Sidewalk Width
Priority
feet552.4 Driveway584.5to165322
feet 3.0-4.0586.4 Cross Slope (PAR)SF93595.9to $120 $11,11514946310ft
feet 3.0-4.0600.2 Cross Slope (PAR)SF56605.9to $120 $6,66914946410ft
feet .28602.6 Vertical Change LF10603.6to $75 $73113625010ft
feet 2.0-3.0607.5 Cross Slope (PAR)SF15609.0to $120 $1,75514946510ft
feet 2.0-3.0611.3 Cross Slope (PAR)SF131624.7to $120 $15,67814946610ft
feet 2.0-3.0627.9 Cross Slope (PAR)SF15629.4to $120 $1,75514946710ft
feet 2.0-3.0633.1 Cross Slope (PAR)SF75640.8to $120 $9,00914946810ft
feet 3.0-4.0648.1 Cross Slope (PAR)SF27650.9to $120 $3,27614946910ft
feet 5.0-6.0650.9 Cross Slope (PAR)SF22653.2to $120 $2,69114947010ft
feet 3.0-4.0653.2 Cross Slope (PAR)SF69660.3to $120 $8,30714947110ft
feet 2.0-3.0660.3 Cross Slope (PAR)SF12661.5to $120 $1,40414947210ft
feet 2.0-3.0664.1 Cross Slope (PAR)SF14665.5to $120 $1,63814947310ft
feet 2.0-3.0682.1 Cross Slope (PAR)SF83690.6to $120 $9,94514947410ft
feet 2.0-3.0692.7 Cross Slope (PAR)SF33696.1to $120 $3,97814947510ft
feet 2.0-3.0698.9 Cross Slope (PAR)SF129712.1to $120 $15,44414947610ft
feet 2.0-3.0715.9 Cross Slope (PAR)SF14717.3to $120 $1,63814947710ft
feet 3.0-4.0727.9 Cross Slope (PAR)SF16729.5to $120 $1,87214947810ft
feet 2.0-3.0734.2 Cross Slope (PAR)SF113745.8to $120 $13,57214947910ft
feet 2.0-3.0748.1 Cross Slope (PAR)SF78756.1to $120 $9,36014948010ft
feet 3.0-4.0758.3 Cross Slope (PAR)SF59764.4to $120 $7,13714948110ft
feet 2.0-3.0764.4 Cross Slope (PAR)SF28767.3to $120 $3,39314948210ft
feet 4.0-5.0767.3 Cross Slope (PAR)SF30770.4to $120 $3,62714948310ft
feet 2.0-3.0770.9 Cross Slope (PAR)SF12772.1to $120 $1,40414948410ft
feet 2.0-3.0774.7 Cross Slope (PAR)SF154790.5to $120 $18,48614948510ft
feet 2.0-3.0797.4 Cross Slope (PAR)SF98807.4to $120 $11,70014948610ft
feet 3.0-4.0815.3 Cross Slope (PAR)SF32818.6to $120 $3,86114948710ft
feet 2.0-3.0818.6 Cross Slope (PAR)SF24821.1to $120 $2,92514948810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
646
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
LOMA VISTA AVE
Survey Street Name Starting Street Name
CORONA AVE
End Street Name
1912190848
Run ID
District Blvd
74
ID Sidewalk Width
Priority
feet 2.0-3.0823.3 Cross Slope (PAR)SF78831.3to $120 $9,36014948910ft
feet832.9 Cold Patch 46837.6to140376 10 ft
feet 3.0-4.0838.7 Cross Slope (PAR)SF24841.2to $120 $2,92514949010ft
feet 2.0-3.0843.7 Cross Slope (PAR)SF17845.4to $120 $1,98914949110ft
feet 2.0-3.0848.2 Cross Slope (PAR)SF24850.7to $120 $2,92514949210ft
feet 2.0-3.0861.1 Cross Slope (PAR)SF98871.2to $120 $11,81714949310ft
feet 2.0-3.0877.2 Cross Slope (PAR)SF53882.6to $120 $6,31814949410ft
feet 2.0-3.0886.9 Cross Slope (PAR)SF101897.3to $120 $12,16814949510ft
feet 2.21895.3 Vertical Change REF10896.3to136251 10 ft
feet 5.0-6.0898.0 Cross Slope (PAR)SF85906.7to $120 $10,17914949610ft
feet 2.0-3.0907.3 Cross Slope (PAR)SF106918.2to $120 $12,75314949710ft
feet 4.0-5.0918.8 Cross Slope (PAR)SF48923.7to $120 $5,73314949810ft
feet 2.0-3.0924.6 Cross Slope (PAR)SF41928.8to $120 $4,91414949910ft
$564,876.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:LOMA VISTA AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
647
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191045
Run ID
District Blvd
83.5
ID Sidewalk Width
Priority
feet 2.0-3.00.9 Cross Slope (PAR)SF458.1to $120 $5,4001490186ft
feet 4.0-5.08.6 Cross Slope (PAR)SF20942.0to $120 $25,0501490196ft
feet 2.0-3.042.0 Cross Slope (PAR)SF2445.8to $120 $2,8501490206ft
feet 4.0-5.045.8 Cross Slope (PAR)SF2449.6to $120 $2,8501490216ft
feet 2.0-3.049.6 Cross Slope (PAR)SF850.9to $120 $9751490226ft
feet 2.0-3.054.1 Cross Slope (PAR)SF655.1to $120 $7501490236ft
feet 3.0-4.058.8 Cross Slope (PAR)SF1661.4to $120 $1,9501490246ft
feet 2.0-3.061.4 Cross Slope (PAR)SF6071.0to $120 $7,2001490256ft
feet 3.0-4.082.8 Cross Slope (PAR)SF984.2to $120 $1,0501490266ft
feet 3.0-4.088.7 Cross Slope (PAR)SF1991.8to $120 $2,3251490276ft
feet 2.0-3.091.8 Cross Slope (PAR)SF3296.9to $120 $3,8251490286ft
feet 4.0-5.097.5 Cross Slope (PAR)SF25101.5to $120 $3,0001490296ft
feet 2.0-3.0102.3 Cross Slope (PAR)SF47109.8to $120 $5,6251490306ft
feet 5.0-6.0112.5 Cross Slope (PAR)SF16115.1to $120 $1,9501490316ft
feet115.3 Protruding Object JOB6116.3to $99 $991673126ft
feet 3.0-4.0116.7 Cross Slope (PAR)SF35122.3to $120 $4,2001490326ft
feet 2.0-3.0122.3 Cross Slope (PAR)SF55131.1to $120 $6,6001490336ft
feet 3.0-4.0137.6 Cross Slope (PAR)SF13139.6to $120 $1,5001490346ft
feet140.7 Driveway176.3to165291
feet 3.0-4.0176.4 Cross Slope (Driveway)SF13178.4to $40 $5001490356ft
feet 2.0-3.0179.3 Cross Slope (PAR)SF8180.6to $120 $9751490366ft
feet 3.0-4.0187.8 Cross Slope (PAR)SF25191.8to $120 $3,0001490376ft
feet 2.0-3.0191.9 Cross Slope (PAR)SF11193.7to $120 $1,3501490386ft
feet 2.0-3.0198.8 Cross Slope (PAR)SF154223.5to $120 $18,5251490396ft
feet 2.0-3.0227.0 Cross Slope (PAR)SF18229.9to $120 $2,1751490406ft
feet 2.0-3.0233.7 Cross Slope (PAR)SF66244.2to $120 $7,8751490416ft
feet 2.0-3.0247.3 Cross Slope (PAR)SF33252.6to $120 $3,9751490426ft
feet 2.0-3.0259.3 Cross Slope (PAR)SF80272.1to $120 $9,6001490436ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
648
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191045
Run ID
District Blvd
83.5
ID Sidewalk Width
Priority
feet 2.0-3.0279.4 Cross Slope (PAR)SF12281.3to $120 $1,4251490446ft
feet 2.0-3.0286.8 Cross Slope (PAR)SF6287.8to $120 $7501490456ft
feet 3.0-4.0292.9 Cross Slope (PAR)SF8294.2to $120 $9751490466ft
feet 2.0-3.0294.4 Cross Slope (PAR)SF21297.8to $120 $2,5501490476ft
feet 2.0-3.0307.8 Cross Slope (PAR)SF61317.6to $120 $7,3501490486ft
feet 2.0-3.0320.8 Cross Slope (PAR)SF143343.6to $120 $17,1001490496ft
feet 2.0-3.0345.7 Cross Slope (PAR)SF135367.3to $120 $16,2001490506ft
feet -.51357.9 Vertical Change REF6358.9to136146 6 ft
feet 3.0-4.0371.3 Cross Slope (PAR)SF19374.3to $120 $2,2501490516ft
feet -.34374.5 Vertical Change LF6375.5to $75 $4691361476ft
feet 2.0-3.0379.3 Cross Slope (PAR)SF50387.3to $120 $6,0001490526ft
feet 4.0-5.0387.3 Cross Slope (PAR)SF30392.1to $120 $3,6001490536ft
feet 2.0-3.0392.1 Cross Slope (PAR)SF7393.2to $120 $8251490546ft
feet 3.0-4.0399.3 Cross Slope (PAR)SF22402.8to $120 $2,6251490556ft
feet 4.0-5.0404.9 Cross Slope (PAR)SF105421.7to $120 $12,6001490566ft
feet 2.0-3.0421.7 Cross Slope (PAR)SF10423.3to $120 $1,2001490576ft
feet -.5427.0 Vertical Change REF6428.0to136148 6 ft
feet 2.0-3.0427.9 Cross Slope (PAR)SF40434.3to $120 $4,8001490586ft
feet -.35432.6 Vertical Change REF6433.6to136149 6 ft
feet 2.0-3.0436.8 Cross Slope (PAR)SF139459.0to $120 $16,6501490596ft
feet459.3 Driveway503.3to165292
feet .32481.2 Vertical Change REF6482.2to136150 6 ft
feet -.41487.5 Vertical Change REF6488.5to136151 6 ft
feet 3.0-4.0503.8 Cross Slope (PAR)SF13505.9to $120 $1,5751490606ft
feet 2.0-3.0506.3 Cross Slope (PAR)SF9507.8to $120 $1,1251490616ft
feet .91510.1 Vertical Change SF6511.1to $75 $4691361526ft
feet 3.0-4.0519.1 Cross Slope (PAR)SF22522.6to $120 $2,6251490626ft
feet .37519.8 Vertical Change REF6520.8to136153 6 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
649
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191045
Run ID
District Blvd
83.5
ID Sidewalk Width
Priority
feet 2.0-3.0523.0 Cross Slope (PAR)SF41529.6to $120 $4,9501490636ft
feet .79532.0 Vertical Change SF6533.0to $75 $4691361546ft
feet 2.0-3.0533.1 Cross Slope (PAR)SF25537.1to $120 $3,0001490646ft
feet 2.0-3.0541.5 Cross Slope (PAR)SF118560.4to $120 $14,1751490656ft
feet 3.09567.7 Vertical Change SF6568.7to $75 $4691361556ft
feet 2.0-3.0573.8 Cross Slope (PAR)SF13575.8to $120 $1,5001490666ft
$252,899.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:S ATLANTIC BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
650
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001281111
Run ID
District Blvd
64
ID Sidewalk Width
Priority
feet 2.0-3.01.0 Cross Slope (PAR)SF547.8to $120 $6,5281642778ft
feet 2.0-3.014.3 Cross Slope (PAR)SF20539.9to $120 $24,5761642788ft
feet .3138.6 Vertical Change REF839.6to140175 8 ft
feet 2.0-3.053.2 Cross Slope (PAR)SF3457.4to $120 $4,0321642798ft
feet 2.0-3.061.3 Cross Slope (PAR)SF1463.0to $120 $1,6321642808ft
feet 2.0-3.075.8 Cross Slope (PAR)SF5482.5to $120 $6,4321642818ft
feet 2.0-3.086.6 Cross Slope (PAR)SF4892.6to $120 $5,7601642828ft
feet 2.0-3.095.9 Cross Slope (PAR)SF2999.5to $120 $3,4561642838ft
feet 2.0-3.0105.4 Cross Slope (PAR)SF18107.6to $120 $2,1121642848ft
feet 2.0-3.0117.3 Cross Slope (PAR)SF52123.8to $120 $6,2401642858ft
feet -.26141.8 Vertical Change REF8142.8to140176 8 ft
feet 2.0-3.0142.3 Cross Slope (PAR)SF46148.0to $120 $5,4721642868ft
feet 2.0-3.0163.3 Cross Slope (PAR)SF28166.8to $120 $3,3601642878ft
feet 4.0-5.0168.6 Cross Slope (PAR)SF50174.8to $120 $5,9521642888ft
feet 2.0-3.0174.9 Cross Slope (PAR)SF11176.3to $120 $1,3441642898ft
feet179.0 Driveway221.4to166394
feet .27179.9 Vertical Change REF8180.9to140177 8 ft
feet 2.0-3.0227.1 Cross Slope (PAR)SF152246.1to $120 $18,2401642908ft
feet 2.0-3.0248.3 Cross Slope (PAR)SF74257.5to $120 $8,8321642918ft
feet 2.0-3.0261.4 Cross Slope (PAR)SF22264.2to $120 $2,6881642928ft
feet .29269.0 Vertical Change LF8270.0to $75 $6001401788ft
feet 2.0-3.0270.3 Cross Slope (PAR)SF30274.1to $120 $3,6481642938ft
feet 2.0-3.0276.4 Cross Slope (PAR)SF193300.5to $120 $23,1361642948ft
feet300.5 Driveway343.5to166395
feet .37324.1 Vertical Change REF8325.1to140179 8 ft
feet 3.0-4.0344.7 Cross Slope (PAR)SF49350.8to $120 $5,8561642958ft
feet 2.0-3.0350.8 Cross Slope (PAR)SF305388.9to $120 $36,5761642968ft
feet 2.0-3.0393.5 Cross Slope (PAR)SF22396.3to $120 $2,6881642978ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
651
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001281111
Run ID
District Blvd
64
ID Sidewalk Width
Priority
feet 2.0-3.0400.7 Cross Slope (PAR)SF143418.6to $120 $17,1841642988ft
feet 2.0-3.0422.8 Cross Slope (PAR)SF21425.4to $120 $2,4961642998ft
feet 2.0-3.0428.4 Cross Slope (PAR)SF15430.3to $120 $1,8241643008ft
feet 2.0-3.0462.3 Cross Slope (PAR)SF18464.6to $120 $2,2081643018ft
feet 4.0-5.0465.5 Cross Slope (PAR)SF54472.3to $120 $6,5281643028ft
feet .29465.7 Vertical Change REF8466.7to140180 8 ft
feet 2.0-3.0472.5 Cross Slope (PAR)SF20475.0to $120 $2,4001643038ft
feet 2.0-3.0484.4 Cross Slope (PAR)SF27487.8to $120 $3,2641643048ft
feet -.3485.1 Vertical Change REF8486.1to140181 8 ft
feet490.7 Driveway545.3to166396
feet .28515.1 Vertical Change REF8516.1to140182 8 ft
feet 2.0-3.0554.0 Cross Slope (PAR)SF18556.3to $120 $2,2081643058ft
feet 2.0-3.0559.8 Cross Slope (PAR)SF54566.5to $120 $6,4321643068ft
feet 3.0-4.0568.9 Cross Slope (PAR)SF10570.1to $120 $1,1521643078ft
feet 2.0-3.0570.1 Cross Slope (PAR)SF13571.7to $120 $1,5361643088ft
feet .36571.0 Vertical Change REF8572.0to140184 8 ft
feet 2.0-3.0574.1 Cross Slope (PAR)SF85584.7to $120 $10,1761643098ft
feet 2.0-3.0588.3 Cross Slope (PAR)SF62596.0to $120 $7,3921643108ft
feet .42591.4 Vertical Change REF8592.4to140185 8 ft
feet 2.0-3.0603.1 Cross Slope (PAR)SF124618.6to $120 $14,8801643118ft
feet 2.0-3.0621.6 Cross Slope (PAR)SF125637.2to $120 $14,9761643128ft
feet 2.0-3.0646.3 Cross Slope (PAR)SF83656.7to $120 $9,9841643138ft
feet 2.0-3.0673.9 Cross Slope (PAR)SF34678.1to $120 $4,0321643148ft
feet 2.0-3.0686.2 Cross Slope (PAR)SF49692.3to $120 $5,8561643158ft
feet 2.0-3.0694.6 Cross Slope (PAR)SF58701.8to $120 $6,9121643168ft
feet 2.0-3.0706.6 Cross Slope (PAR)SF31710.5to $120 $3,7441643178ft
feet 2.0-3.0712.8 Cross Slope (PAR)SF159732.7to $120 $19,1041643188ft
feet 2.0-3.0735.1 Cross Slope (PAR)SF46740.8to $120 $5,4721643198ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
652
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S ATLANTIC BLVD
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001281111
Run ID
District Blvd
64
ID Sidewalk Width
Priority
feet 2.0-3.0763.0 Cross Slope (PAR)SF28766.5to $120 $3,3601643208ft
feet 2.0-3.0769.3 Cross Slope (PAR)SF38774.1to $120 $4,6081643218ft
feet779.1 Driveway828.3to166397
feet 2.0-3.0828.5 Cross Slope (Driveway)SF14830.3to $40 $5761643228ft
feet .35835.9 Vertical Change LF8836.9to $75 $6001401868ft
feet .26848.9 Vertical Change LF8849.9to $75 $6001401878ft
feet856.3 Driveway912.8to166398
feet -.27894.9 Vertical Change REF8895.9to140188 8 ft
feet 2.0-3.0922.1 Cross Slope (PAR)SF30925.9to $120 $3,6481643238ft
feet 2.0-3.0933.3 Cross Slope (PAR)SF34937.6to $120 $4,1281643248ft
feet 2.0-3.0941.0 Cross Slope (PAR)SF66949.3to $120 $7,9681643258ft
feet -.31941.8 Vertical Change REF8942.8to140189 8 ft
feet 2.0-3.0957.4 Cross Slope (PAR)SF27960.8to $120 $3,2641643268ft
feet 2.0-3.0980.8 Cross Slope (PAR)SF62988.6to $120 $7,4881643278ft
feet 2.0-3.0992.3 Cross Slope (PAR)SF32996.3to $120 $3,8401643288ft
feet 2.0-3.0999.8 Cross Slope (PAR)SF681008.3to $120 $8,1601643298ft
feet 2.0-3.01014.1 Cross Slope (PAR)SF101015.4to $120 $1,2481643308ft
feet 2.0-3.01025.9 Cross Slope (PAR)SF1351042.8to $120 $16,2241643318ft
feet 2.0-3.01052.6 Cross Slope (PAR)SF431058.0to $120 $5,1841643328ft
feet 2.0-3.01061.5 Cross Slope (PAR)SF751070.9to $120 $9,0241643338ft
feet 2.0-3.01073.0 Cross Slope (PAR)SF131074.6to $120 $1,5361643348ft
feet 2.0-3.01076.9 Cross Slope (PAR)SF821087.2to $120 $9,8881643358ft
feet 2.0-3.01091.0 Cross Slope (PAR)SF241094.0to $120 $2,8801643368ft
feet 2.0-3.01097.8 Cross Slope (PAR)SF141099.5to $120 $1,6321643378ft
feet 2.0-3.01108.8 Cross Slope (PAR)SF81109.8to $120 $9601643388ft
feet 2.0-3.01120.3 Cross Slope (PAR)SF421125.6to $120 $5,0881643398ft
$430,824.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:S ATLANTIC BLVD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
653
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S DOWNEY RD
Survey Street Name Starting Street Name
SIDEWALK CONSTRUCTION
End Street Name
1912181548
Run ID
District Blvd
110.75
ID Sidewalk Width
Priority
feet 6.0-7.00.1 Running Slope SF101.9to $120 $1,1881664716ft
feet3.6 Continuous Width SF54.6to $120 $6601676236ft
feet 5.0-6.09.7 Running Slope SF1412.2to $120 $1,6501664726ft
feet12.0 Continuous Width SF613.0to $120 $6601678496ft
feet 4.0-5.016.8 Cross Slope (PAR)SF4725.3to $120 $5,6101497566ft
feet 2.0-3.025.3 Cross Slope (PAR)SF826.8to $120 $9901497576ft
feet .3925.9 Vertical Change REF626.9to136300 6 ft
feet 3.0-4.030.4 Cross Slope (PAR)SF4338.3to $120 $5,2141497586ft
feet39.2 Cold Patch 1742.3to140381 6 ft
feet 2.9140.8 Vertical Change SF641.8to $75 $4131363016ft
feet 3.0-4.043.2 Cross Slope (PAR)SF644.3to $120 $7261497596ft
feet 2.0-3.045.9 Cross Slope (PAR)SF1949.3to $120 $2,2441497606ft
feet 2.0-3.052.7 Cross Slope (PAR)SF954.3to $120 $1,0561497616ft
feet .2756.3 Vertical Change LF657.3to $75 $4131363026ft
feet -.6361.5 Vertical Change SF662.5to $75 $4131363036ft
feet 2.0-3.063.8 Cross Slope (PAR)SF3770.6to $120 $4,4881497626ft
feet 2.0-3.074.8 Cross Slope (PAR)SF1377.1to $120 $1,5181497636ft
feet .5775.1 Vertical Change REF676.1to136304 6 ft
feet 3.0-4.079.7 Cross Slope (PAR)SF680.7to $120 $6601497646ft
feet .3382.1 Vertical Change LF683.1to $75 $4131363056ft
feet82.3 Cold Patch 1184.3to140382 6 ft
feet 2.0-3.089.9 Cross Slope (PAR)SF690.9to $120 $6601497656ft
feet100.0 Cold Patch 20103.6to140383 6 ft
feet 2.67101.9 Vertical Change SF6102.9to $75 $4131363066ft
feet 4.0-5.0107.6 Cross Slope (PAR)SF6108.6to $120 $6601497666ft
feet 3.0-4.0114.3 Cross Slope (PAR)SF14116.9to $120 $1,7161497676ft
feet118.6 Cold Patch 18121.8to140384 6 ft
feet -.34119.3 Vertical Change LF6120.3to $75 $4131363076ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
654
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S DOWNEY RD
Survey Street Name Starting Street Name
SIDEWALK CONSTRUCTION
End Street Name
1912181548
Run ID
District Blvd
110.75
ID Sidewalk Width
Priority
feet125.1 Cold Patch 17128.1to140385 6 ft
feet 5.0-6.0132.7 Cross Slope (PAR)SF6133.8to $120 $7261497686ft
feet .34138.5 Vertical Change LF6139.5to $75 $4131363086ft
feet139.3 Cold Patch 23143.4to140253 6 ft
feet -.88141.6 Vertical Change SF6142.6to $75 $4131363096ft
feet .26143.5 Vertical Change LF6144.5to $75 $4131363106ft
feet -.29147.7 Vertical Change LF6148.7to $75 $4131363116ft
feet 2.0-3.0152.9 Cross Slope (PAR)SF11154.9to $120 $1,3201497696ft
feet 2.0-3.0158.2 Cross Slope (PAR)SF76172.0to $120 $9,1081497706ft
feet 3.0-4.0174.6 Cross Slope (PAR)SF10176.4to $120 $1,1881497716ft
feet 2.0-3.0177.1 Cross Slope (PAR)SF10178.9to $120 $1,1881497726ft
feet 2.0-3.0182.9 Cross Slope (PAR)SF53192.5to $120 $6,3361497736ft
feet 2.0-3.0195.3 Cross Slope (PAR)SF34201.5to $120 $4,0921497746ft
feet -.27202.1 Vertical Change LF6203.1to $75 $4131363126ft
feet 3.0-4.0205.9 Cross Slope (PAR)SF14208.4to $120 $1,6501497756ft
feet .35209.8 Vertical Change LF6210.8to $75 $4131363136ft
feet .73226.3 Vertical Change SF16229.2to $75 $1,1961363146ft
feet228.6 Driveway282.9to165339
feet -.3237.3 Vertical Change REF6238.3to136315 6 ft
feet .26267.6 Vertical Change REF6268.6to136316 6 ft
feet 4.0-5.0283.6 Cross Slope (PAR)SF19287.1to $120 $2,3101497766ft
feet 2.0-3.0288.1 Cross Slope (PAR)SF7289.4to $120 $8581497776ft
feet 4.0-5.0293.8 Cross Slope (PAR)SF7295.1to $120 $8581497786ft
feet 2.0-3.0297.2 Cross Slope (PAR)SF61308.3to $120 $7,3261497796ft
feet 4.0-5.0311.4 Cross Slope (PAR)SF21315.3to $120 $2,5741497806ft
feet 2.0-3.0320.6 Cross Slope (PAR)SF52330.1to $120 $6,2701497816ft
feet 4.0-5.0334.2 Cross Slope (PAR)SF9335.8to $120 $1,0561497826ft
feet 3.0-4.0338.9 Cross Slope (PAR)SF10340.8to $120 $1,2541497836ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
655
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S DOWNEY RD
Survey Street Name Starting Street Name
SIDEWALK CONSTRUCTION
End Street Name
1912181548
Run ID
District Blvd
110.75
ID Sidewalk Width
Priority
feet 2.0-3.0340.8 Cross Slope (PAR)SF42348.4to $120 $5,0161497846ft
feet348.4 Cold Patch 19351.9to140386 6 ft
feet .47350.5 Vertical Change LF6351.5to $75 $4131363186ft
feet 4.0-5.0351.9 Cross Slope (PAR)SF31357.5to $120 $3,6961497856ft
feet .31357.2 Vertical Change REF6358.2to136319 6 ft
feet -.65363.5 Vertical Change SF6364.5to $75 $4131363206ft
feet .29366.6 Vertical Change LF6367.6to $75 $4131363216ft
feet 2.0-3.0373.7 Cross Slope (PAR)SF8375.1to $120 $9241497866ft
feet 3.0-4.0377.3 Cross Slope (PAR)SF6378.3to $120 $6601497876ft
feet 2.0-3.0378.3 Cross Slope (PAR)SF11380.3to $120 $1,3201497886ft
feet 2.0-3.0383.0 Cross Slope (PAR)SF30388.5to $120 $3,6301497896ft
feet 2.0-3.0393.4 Cross Slope (PAR)SF12395.5to $120 $1,3861497906ft
feet395.6 Driveway439.0to165340
feet -.42402.3 Vertical Change REF6403.3to136322 6 ft
feet -.4420.8 Vertical Change REF6421.8to136324 6 ft
feet .6426.2 Vertical Change REF6427.2to136325 6 ft
feet .38439.4 Vertical Change REF20443.0to136326 6 ft
feet 9.0-10.0439.5 Cross Slope (PAR)SF6440.5to $120 $6601497916ft
feet440.5 Cold Patch 18443.8to140387 6 ft
feet 2.0-3.0445.7 Cross Slope (PAR)SF12447.8to $120 $1,3861497926ft
feet .67450.0 Vertical Change SF6451.0to $75 $4131363276ft
feet 2.0-3.0461.8 Cross Slope (PAR)SF6462.8to $120 $6601497936ft
feet463.8 Cold Patch 23467.9to140388 6 ft
feet463.8 Cold Patch 88479.8to140389 6 ft
feet 5.0-6.0467.9 Cross Slope (PAR)SF28473.0to $120 $3,3661497946ft
$108,314.25TOTAL COST FOR:DISTRICT BLVDSside of Starting at:S DOWNEY RD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
656
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
S MAYWOOD AVE
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912181641
Run ID
District Blvd
87.25
ID Sidewalk Width
Priority
feet 3.0-4.01.6 Cross Slope (PAR)SF597.8to $120 $7,06814950010ft
feet 2.0-3.08.0 Cross Slope (PAR)SF9317.8to $120 $11,17214950110ft
feet 4.0-5.018.6 Cross Slope (PAR)SF15434.8to $120 $18,46814950210ft
feet 2.0-3.036.5 Cross Slope (PAR)SF6743.6to $120 $8,09414950310ft
feet 2.0-3.050.3 Cross Slope (PAR)SF8158.8to $120 $9,69014950410ft
feet 4.0-5.058.8 Cross Slope (PAR)SF1059.8to $120 $1,14014950510ft
feet 2.0-3.061.1 Cross Slope (PAR)SF1162.3to $120 $1,36814950610ft
feet 2.0-3.068.0 Cross Slope (PAR)SF12280.8to $120 $14,59214950710ft
feet -.3180.3 Vertical Change REF1081.3to136252 10 ft
feet 2.0-3.086.6 Cross Slope (PAR)SF4991.8to $120 $5,92814950810ft
feet 2.0-3.095.1 Cross Slope (PAR)SF79103.4to $120 $9,46214950910ft
feet 2.0-3.0108.9 Cross Slope (PAR)SF36112.7to $120 $4,33214951010ft
feet 2.0-3.0124.3 Cross Slope (PAR)SF52129.8to $120 $6,27014951110ft
feet 3.0-4.0134.9 Cross Slope (PAR)SF110146.5to $120 $13,22414951210ft
feet 3.0-4.0149.8 Cross Slope (PAR)SF29152.8to $120 $3,42014951310ft
feet 2.0-3.0152.8 Cross Slope (PAR)SF48157.8to $120 $5,70014951410ft
feet 2.0-3.0160.0 Cross Slope (PAR)SF88169.3to $120 $10,60214951510ft
feet 4.0-5.0169.8 Cross Slope (PAR)SF143184.9to $120 $17,21414951610ft
feet 2.0-3.0185.1 Cross Slope (PAR)SF13186.5to $120 $1,59614951710ft
feet 4.0-5.0188.7 Cross Slope (PAR)SF63195.3to $120 $7,52414951810ft
feet 2.0-3.0200.0 Cross Slope (PAR)SF55205.8to $120 $6,61214951910ft
feet 2.0-3.0208.8 Cross Slope (PAR)SF108220.2to $120 $12,99614952010ft
feet 2.0-3.0223.8 Cross Slope (PAR)SF139238.4to $120 $16,64414952110ft
feet 6.0-7.0242.0 Cross Slope (PAR)SF37245.9to $120 $4,44614952210ft
feet 6.0-7.0248.8 Cross Slope (PAR)SF48253.8to $120 $5,70014952310ft
feet -.27254.5 Vertical Change REF10255.5to136253 10 ft
feet 4.0-5.0255.4 Cross Slope (PAR)SF11256.6to $120 $1,36814952410ft
feet 2.0-3.0257.1 Cross Slope (PAR)SF11258.3to $120 $1,36814952510ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
657
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
S MAYWOOD AVE
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912181641
Run ID
District Blvd
87.25
ID Sidewalk Width
Priority
feet259.5 Driveway284.3to165323
feet 3.0-4.0289.0 Cross Slope (PAR)SF55294.8to $120 $6,61214952610ft
feet 2.0-3.0295.6 Cross Slope (PAR)SF107306.9to $120 $12,88214952710ft
feet307.8 Driveway331.6to165324
feet .27327.3 Vertical Change REF10328.3to136254 10 ft
feet 3.0-4.0332.8 Cross Slope (PAR)SF72340.4to $120 $8,66414952810ft
feet 2.0-3.0340.4 Cross Slope (PAR)SF10341.5to $120 $1,25414952910ft
feet 3.0-4.0344.3 Cross Slope (PAR)SF141359.1to $120 $16,87214953010ft
feet 2.0-3.0360.4 Cross Slope (PAR)SF31363.7to $120 $3,76214953110ft
feet363.7 Driveway396.8to165325
feet 3.0-4.0396.8 Cross Slope (Driveway)SF28399.7to $40 $1,10214953210ft
feet 3.0-4.0401.8 Cross Slope (PAR)SF47406.7to $120 $5,58614953310ft
feet .28407.0 Vertical Change REF10408.0to136255 10 ft
feet 2.0-3.0407.5 Cross Slope (PAR)SF11408.7to $120 $1,36814953410ft
feet -.73411.3 Vertical Change REF10412.3to136256 10 ft
feet 2.0-3.0412.3 Cross Slope (PAR)SF57418.3to $120 $6,84014953510ft
feet 4.0-5.0418.7 Cross Slope (PAR)SF323452.7to $120 $38,76014953610ft
feet -.35450.7 Vertical Change REF10451.7to136257 10 ft
feet 6.0-7.0452.7 Cross Slope (PAR)SF15454.3to $120 $1,82414953710ft
feet 5.0-6.0455.6 Cross Slope (PAR)SF62462.1to $120 $7,41014953810ft
feet .88463.8 Vertical Change SF10464.8to $75 $71313625810ft
feet 3.0-4.0465.2 Cross Slope (PAR)SF10466.3to $120 $1,25414953910ft
feet468.1 Driveway510.1to165326
feet468.1 Driveway575.5to165327
feet 3.0-4.0510.9 Cross Slope (Driveway)SF11512.1to $40 $45614954010ft
feet 2.0-3.0512.8 Cross Slope (Driveway)SF14514.3to $40 $57014954110ft
feet 5.0-6.0514.6 Running Slope REF18516.5to166469 10 ft
feet 3.0-4.0516.4 Cross Slope (Driveway)SF32519.8to $40 $1,29214954210ft
feet 2.0-3.0519.8 Cross Slope (Driveway)SF19521.8to $40 $76014954310ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
658
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
S MAYWOOD AVE
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
1912181641
Run ID
District Blvd
87.25
ID Sidewalk Width
Priority
feet .27528.8 Vertical Change REF10529.8to136259 10 ft
feet 5.0-6.0546.3 Running Slope REF33549.8to166470 10 ft
feet .28547.0 Vertical Change REF10548.0to136260 10 ft
feet 2.0-3.0547.5 Cross Slope (Driveway)SF11548.7to $40 $45614954410ft
feet 3.0-4.0561.3 Cross Slope (Driveway)SF35565.0to $40 $1,40614954510ft
feet 2.0-3.0565.5 Cross Slope (Driveway)SF68572.7to $40 $2,73614954610ft
$328,576.50TOTAL COST FOR:DISTRICT BLVDNside of Starting at:S MAYWOOD AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
659
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S MAYWOOD AVE
Survey Street Name Starting Street Name
EVERETT AVE
End Street Name
1912181606
Run ID
District Blvd
62.5
ID Sidewalk Width
Priority
feet 3.0-4.00.5 Cross Slope (PAR)SF313.8to $120 $3,76214969810ft
feet 5.0-6.03.8 Cross Slope (PAR)SF125.1to $120 $1,48214969910ft
feet 3.0-4.07.2 Cross Slope (PAR)SF138.6to $120 $1,59614970010ft
feet 2.0-3.014.1 Cross Slope (PAR)SF7522.0to $120 $9,00614970110ft
feet .3517.3 Vertical Change REF1018.3to136284 10 ft
feet 4.0-5.022.9 Cross Slope (PAR)SF4828.0to $120 $5,81414970210ft
feet 2.0-3.033.5 Cross Slope (PAR)SF35170.4to $120 $42,06614970310ft
feet 2.8847.9 Vertical Change REF1048.9to136285 10 ft
feet 4.0-5.070.8 Cross Slope (PAR)SF7578.7to $120 $9,00614970410ft
feet 3.0-4.080.8 Cross Slope (PAR)SF1382.2to $120 $1,59614970510ft
feet 2.0-3.082.4 Cross Slope (PAR)SF7290.0to $120 $8,66414970610ft
feet -.2783.1 Vertical Change REF1084.1to136286 10 ft
feet 3.0-4.092.6 Cross Slope (PAR)SF1794.4to $120 $2,05214970710ft
feet 2.0-3.094.4 Cross Slope (PAR)SF2997.4to $120 $3,42014970810ft
feet 2.0-3.0107.1 Cross Slope (PAR)SF106118.3to $120 $12,76814970910ft
feet 2.0-3.0123.5 Cross Slope (PAR)SF117135.8to $120 $14,02214971010ft
feet 4.0-5.0147.8 Cross Slope (PAR)SF165165.2to $120 $19,83614971110ft
feet165.2 Driveway198.1to165338
feet 2.0-3.0199.0 Cross Slope (PAR)SF106210.2to $120 $12,76814971210ft
feet .42212.3 Vertical Change LF10213.3to $75 $71313628710ft
feet 2.0-3.0214.2 Cross Slope (PAR)SF50219.5to $120 $6,04214971310ft
feet 3.44214.6 Vertical Change REF10215.6to136288 10 ft
feet .35217.4 Vertical Change REF28220.3to136289 10 ft
feet 2.0-3.0227.9 Cross Slope (PAR)SF23230.3to $120 $2,73614971410ft
feet .48240.5 Vertical Change LF10241.5to $75 $71313629010ft
feet 7.0-8.0241.9 Cross Slope (PAR)SF17243.7to $120 $2,05214971510ft
feet 3.0-4.0246.0 Cross Slope (PAR)SF33249.5to $120 $3,99014971610ft
feet 2.0-3.0249.5 Cross Slope (PAR)SF23251.9to $120 $2,73614971710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
660
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
S MAYWOOD AVE
Survey Street Name Starting Street Name
EVERETT AVE
End Street Name
1912181606
Run ID
District Blvd
62.5
ID Sidewalk Width
Priority
feet 2.0-3.0254.2 Cross Slope (PAR)SF151270.1to $120 $18,12614971810ft
feet 3.5266.6 Vertical Change REF10267.6to136291 10 ft
feet 4.0-5.0270.1 Cross Slope (PAR)SF21272.3to $120 $2,50814971910ft
feet 3.0-4.0282.3 Cross Slope (PAR)SF19284.3to $120 $2,28014972010ft
feet 2.0-3.0284.4 Cross Slope (PAR)SF175302.8to $120 $20,97614972110ft
feet 3.0-4.0307.5 Cross Slope (PAR)SF18309.4to $120 $2,16614972210ft
feet 2.0-3.0309.4 Cross Slope (PAR)SF19311.4to $120 $2,28014972310ft
feet 2.0-3.0323.2 Cross Slope (PAR)SF29326.2to $120 $3,42014972410ft
feet 3.0-4.0328.7 Cross Slope (PAR)SF162345.7to $120 $19,38014972510ft
feet 2.0-3.0345.7 Cross Slope (PAR)SF29348.7to $120 $3,42014972610ft
feet 2.0-3.0352.4 Cross Slope (PAR)SF25355.0to $120 $2,96414972710ft
feet 2.0-3.0359.3 Cross Slope (PAR)SF14360.8to $120 $1,71014972810ft
feet 4.0-5.0361.1 Cross Slope (PAR)SF57367.1to $120 $6,84014972910ft
feet 2.0-3.0367.1 Cross Slope (PAR)SF22369.4to $120 $2,62214973010ft
$255,531.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:S MAYWOOD AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
661
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
S ATLANTIC BLVD
End Street Name
2001281028
Run ID
District Blvd
63
ID Sidewalk Width
Priority
feet 4.0-5.00.2 Cross Slope (PAR)SF11013.9to $120 $13,1521639468ft
feet 3.0-4.020.1 Cross Slope (PAR)SF6227.9to $120 $7,4881639478ft
feet 2.3824.1 Vertical Change REF825.1to140078 8 ft
feet 2.0-3.028.3 Cross Slope (PAR)SF18150.9to $120 $21,6961639488ft
feet .2637.2 Vertical Change REF838.2to140079 8 ft
feet 4.0-5.050.9 Cross Slope (PAR)SF4957.0to $120 $5,8561639498ft
feet 3.0-4.061.8 Cross Slope (PAR)SF19586.2to $120 $23,4241639508ft
feet86.7 Driveway116.3to166389
feet 4.0-5.0117.4 Cross Slope (PAR)SF8118.4to $120 $9601639518ft
feet 2.0-3.0121.7 Cross Slope (PAR)SF253153.3to $120 $30,3361639528ft
feet .53145.4 Vertical Change REF8146.4to140081 8 ft
feet 4.0-5.0154.5 Cross Slope (PAR)SF293191.1to $120 $35,1361639538ft
feet 4.0-5.0193.3 Cross Slope (PAR)SF118208.1to $120 $14,2081639548ft
$152,256.00TOTAL COST FOR:DISTRICT BLVDNside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
662
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001280952
Run ID
District Blvd
54.25
ID Sidewalk Width
Priority
feet 4.0-5.00.2 Cross Slope (PAR)SF236.0to $120 $2,7841636644ft
feet -.279.6 Vertical Change LF410.6to $75 $3001399894ft
feet10.2 Driveway84.8to166361
feet -.4425.3 Vertical Change REF426.3to139990 4 ft
feet .2664.2 Vertical Change REF465.2to139991 4 ft
feet 2.0-3.087.9 Cross Slope (PAR)SF4097.8to $120 $4,7521636654ft
feet 4.0-5.098.9 Cross Slope (PAR)SF58113.5to $120 $7,0081636664ft
feet 2.0-3.0115.9 Cross Slope (PAR)SF15119.6to $120 $1,7761636674ft
feet 2.0-3.0131.1 Cross Slope (PAR)SF14134.7to $120 $1,7281636684ft
feet 3.0-4.0138.8 Cross Slope (PAR)SF44149.9to $120 $5,3281636694ft
feet 2.0-3.0150.5 Cross Slope (PAR)SF28157.6to $120 $3,4081636704ft
feet 3.0-4.0160.0 Cross Slope (PAR)SF5161.3to $120 $6241636714ft
feet 2.0-3.0161.3 Cross Slope (PAR)SF6162.8to $120 $7201636724ft
feet 5.0-6.0165.3 Cross Slope (PAR)SF16169.4to $120 $1,9681636734ft
feet 3.0-4.0171.4 Cross Slope (PAR)SF15175.2to $120 $1,8241636744ft
feet 2.0-3.0177.9 Cross Slope (PAR)SF38187.3to $120 $4,5121636754ft
feet .26184.5 Vertical Change REF4185.5to139992 4 ft
feet 4.0-5.0189.8 Cross Slope (PAR)SF165231.0to $120 $19,7761636764ft
feet 2.0-3.0231.0 Cross Slope (PAR)SF40240.9to $120 $4,7521636774ft
feet 2.0-3.0243.4 Cross Slope (PAR)SF80263.3to $120 $9,5521636784ft
feet -.29260.5 Vertical Change LF4261.5to $75 $3001399934ft
feet 4.0-5.0269.7 Cross Slope (PAR)SF37279.0to $120 $4,4641636794ft
feet 5.0-6.0281.3 Cross Slope (PAR)SF6282.7to $120 $6721636804ft
feet282.7 Driveway307.2to166362
feet 3.0-4.0308.2 Cross Slope (PAR)SF69325.4to $120 $8,2561636814ft
feet 3.0-4.0327.8 Cross Slope (PAR)SF45339.1to $120 $5,4241636824ft
feet 5.0-6.0339.4 Cross Slope (PAR)SF12342.3to $120 $1,3921636834ft
feet343.9 Driveway361.2to166363
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
663
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001280952
Run ID
District Blvd
54.25
ID Sidewalk Width
Priority
feet 3.0-4.0362.8 Cross Slope (PAR)SF49375.0to $120 $5,8561636844ft
feet -.32373.8 Vertical Change REF4374.8to139994 4 ft
feet 3.0-4.0377.5 Cross Slope (PAR)SF4378.5to $120 $4801636854ft
feet 2.0-3.0378.8 Cross Slope (PAR)SF6380.2to $120 $6721636864ft
feet 3.0-4.0384.9 Cross Slope (PAR)SF52398.0to $120 $6,2881636874ft
feet 5.0-6.0398.0 Cross Slope (PAR)SF10400.6to $120 $1,2481636884ft
feet 3.0-4.0400.9 Cross Slope (PAR)SF5402.1to $120 $5761636894ft
feet402.1 Driveway420.1to166364
feet 4.0-5.0421.3 Cross Slope (PAR)SF5422.6to $120 $6241636904ft
feet 4.0-5.0424.8 Cross Slope (PAR)SF4425.8to $120 $4801636914ft
feet 2.0-3.0426.9 Cross Slope (PAR)SF7428.6to $120 $8161636924ft
feet 5.0-6.0430.2 Running Slope SF4431.3to $120 $5281667524ft
$108,888.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
664
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
ALAMO AVE
End Street Name
2001281000
Run ID
District Blvd
61.5
ID Sidewalk Width
Priority
feet 4.0-5.00.0 Cross Slope (PAR)SF699.8to $120 $8,2321636937ft
feet 2.0-3.09.8 Cross Slope (PAR)SF1011.2to $120 $1,1761636947ft
feet15.2 Driveway49.7to166365
feet 2.0-3.051.8 Cross Slope (PAR)SF5259.2to $120 $6,2161636957ft
feet 2.0-3.062.3 Cross Slope (PAR)SF7172.4to $120 $8,4841636967ft
feet82.3 Driveway126.6to166366
feet 2.0-3.0126.7 Cross Slope (Driveway)SF13128.5to $40 $5041636977ft
feet -.37127.0 Vertical Change REF7128.0to139996 7 ft
feet 2.0-3.0130.6 Cross Slope (PAR)SF179156.1to $120 $21,4201636987ft
feet -.29135.8 Vertical Change REF7136.8to139997 7 ft
feet .56144.4 Vertical Change REF7145.4to139998 7 ft
feet 2.0-3.0160.8 Cross Slope (PAR)SF66170.3to $120 $7,9801636997ft
feet 4.0-5.0170.8 Cross Slope (PAR)SF78181.9to $120 $9,3241637007ft
feet 2.0-3.0183.1 Cross Slope (PAR)SF50190.3to $120 $6,0481637017ft
feet .41191.7 Vertical Change REF7192.7to139999 7 ft
feet 4.0-5.0192.1 Cross Slope (PAR)SF8193.3to $120 $1,0081637027ft
feet -.69195.1 Vertical Change REF7196.1to140000 7 ft
feet 4.0-5.0196.0 Cross Slope (PAR)SF109211.5to $120 $13,0201637037ft
feet .27203.3 Vertical Change REF7204.3to140001 7 ft
feet 2.0-3.0212.0 Cross Slope (PAR)SF51219.3to $120 $6,1321637047ft
feet219.9 Driveway246.3to166367
feet 2.0-3.0247.9 Cross Slope (PAR)SF93261.2to $120 $11,1721637057ft
feet261.4 Driveway304.5to166368
feet 2.0-3.0306.3 Cross Slope (PAR)SF7307.3to $120 $8401637067ft
feet 2.0-3.0309.5 Cross Slope (PAR)SF36314.6to $120 $4,2841637077ft
feet 2.0-3.0327.7 Cross Slope (PAR)SF101342.1to $120 $12,0961637087ft
feet 6.0-7.0339.6 Running Slope REF10341.0to166753 7 ft
feet 2.0-3.0349.6 Cross Slope (PAR)SF69359.4to $120 $8,2321637097ft
feet 3.0-4.0365.0 Cross Slope (PAR)SF92378.2to $120 $11,0881637107ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
665
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
ALAMO AVE
End Street Name
2001281000
Run ID
District Blvd
61.5
ID Sidewalk Width
Priority
feet 2.0-3.0378.6 Cross Slope (PAR)SF59387.0to $120 $7,0561637117ft
feet 2.0-3.0390.3 Cross Slope (PAR)SF29394.4to $120 $3,4441637127ft
feet 4.0-5.0394.4 Cross Slope (PAR)SF20397.2to $120 $2,3521637137ft
feet 2.0-3.0398.7 Cross Slope (PAR)SF63407.7to $120 $7,5601637147ft
feet 5.0-6.0409.0 Cross Slope (PAR)SF97422.9to $120 $11,6761637157ft
feet 5.0-6.0426.2 Cross Slope (PAR)SF29430.3to $120 $3,4441637167ft
feet 3.0-4.0432.8 Cross Slope (PAR)SF16435.1to $120 $1,9321637177ft
feet 2.0-3.0439.4 Cross Slope (PAR)SF228472.0to $120 $27,3841637187ft
feet 3.0-4.0476.6 Cross Slope (PAR)SF11478.1to $120 $1,2601637197ft
feet 2.0-3.0478.9 Cross Slope (PAR)SF241513.3to $120 $28,8961637207ft
feet 2.0-3.0515.8 Cross Slope (PAR)SF50522.9to $120 $5,9641637217ft
feet 3.0-4.0525.0 Cross Slope (PAR)SF29529.2to $120 $3,5281637227ft
feet 2.0-3.0529.3 Cross Slope (PAR)SF23532.6to $120 $2,7721637237ft
feet532.6 Driveway555.6to166369
feet 3.0-4.0555.6 Cross Slope (Driveway)SF23558.9to $40 $9241637247ft
feet -.81560.7 Vertical Change SF7561.7to $75 $5251400027ft
feet 2.0-3.0565.3 Cross Slope (PAR)SF11566.8to $120 $1,2601637257ft
feet 2.0-3.0587.3 Cross Slope (PAR)SF8588.4to $120 $9241637267ft
feet617.8 Driveway649.5to166370
feet .35618.4 Vertical Change REF7619.4to140003 7 ft
feet 3.0-4.0650.9 Cross Slope (PAR)SF8652.0to $120 $9241637277ft
feet 2.0-3.0652.0 Cross Slope (PAR)SF8653.2to $120 $1,0081637287ft
feet 5.0-6.0662.8 Running Slope SF14664.8to $120 $1,6801667547ft
feet668.9 Driveway691.3to166371
feet668.9 Driveway792.7to166372
feet 2.0-3.0697.9 Cross Slope (Driveway)SF12699.6to $40 $4761637297ft
feet 5.0-6.0702.8 Running Slope REF34707.6to166755 7 ft
feet 6.0-7.0708.8 Running Slope REF7709.8to166756 7 ft
feet 5.0-6.0710.6 Running Slope REF7711.6to166757 7 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
666
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
ALAMO AVE
End Street Name
2001281000
Run ID
District Blvd
61.5
ID Sidewalk Width
Priority
feet 6.0-7.0712.2 Running Slope REF11713.7to166758 7 ft
feet .29713.9 Vertical Change REF7714.9to140004 7 ft
feet 5.0-6.0718.1 Running Slope REF43724.3to166759 7 ft
feet 4.0-5.0718.8 Cross Slope (Driveway)SF60727.3to $40 $2,3801637307ft
feet 5.0-6.0728.8 Running Slope REF20731.7to166760 7 ft
feet 3.0-4.0731.8 Cross Slope (Driveway)SF15734.0to $40 $6161637317ft
feet 3.0-4.0736.4 Cross Slope (Driveway)SF19739.1to $40 $7561637327ft
feet 2.0-3.0739.1 Cross Slope (Driveway)SF8740.3to $40 $3361637337ft
feet 2.0-3.0753.1 Cross Slope (Driveway)SF22756.3to $40 $8961637347ft
feet 2.0-3.0759.5 Cross Slope (Driveway)SF7760.5to $40 $2801637357ft
feet 3.0-4.0765.6 Cross Slope (Driveway)SF13767.5to $40 $5321637367ft
feet 3.0-4.0770.1 Cross Slope (Driveway)SF7771.1to $40 $2801637377ft
feet 2.0-3.0772.5 Cross Slope (Driveway)SF48779.3to $40 $1,9041637387ft
feet 4.0-5.0785.2 Cross Slope (Driveway)SF29789.3to $40 $1,1481637397ft
feet 2.0-3.0791.1 Cross Slope (Driveway)SF8792.2to $40 $3081637407ft
$261,681.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
667
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001281112
Run ID
District Blvd
32.25
ID Sidewalk Width
Priority
feet 5.0-6.01.3 Running Slope SF153.2to $120 $1,8241667888ft
feet .372.7 Vertical Change LF83.7to $75 $6001401908ft
feet 9.0-10.05.0 Cross Slope (PAR)SF7214.0to $120 $8,6401643408ft
feet 7.0-8.012.3 Running Slope REF813.3to166789 8 ft
$11,064.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
668
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001281113
Run ID
District Blvd
31
ID Sidewalk Width
Priority
feet 2.0-3.00.9 Cross Slope (PAR)SF608.4to $120 $7,2001643418ft
feet 2.0-3.021.4 Cross Slope (PAR)SF16542.0to $120 $19,7761643428ft
feet42.0 Driveway92.5to166399
feet -.2678.4 Vertical Change REF879.4to140191 8 ft
feet -.3488.5 Vertical Change REF889.5to140192 8 ft
$26,976.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
669
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001281115
Run ID
District Blvd
55
ID Sidewalk Width
Priority
feet 6.0-7.02.7 Cross Slope (PAR)SF54.2to $120 $5401643433ft
feet 5.0-6.04.6 Cross Slope (PAR)SF76.8to $120 $7921643443ft
feet 6.0-7.013.3 Cross Slope (PAR)SF615.2to $120 $6841643453ft
feet .3916.4 Vertical Change LF317.4to $75 $2251401933ft
feet 6.0-7.020.9 Cross Slope (PAR)SF3031.0to $120 $3,6361643463ft
feet .3127.5 Vertical Change REF328.5to140194 3 ft
feet 5.0-6.032.4 Cross Slope (PAR)SF634.5to $120 $7561643473ft
feet .3335.8 Vertical Change REF336.8to140195 3 ft
feet 6.0-7.035.9 Cross Slope (PAR)SF1340.2to $120 $1,5481643483ft
feet 4.0-5.041.8 Cross Slope (Driveway)SF1546.8to $40 $6001643493ft
feet 7.0-8.049.1 Cross Slope (Driveway)SF751.5to $40 $2881643503ft
feet 3.0-4.053.7 Cross Slope (Driveway)SF354.8to $40 $1321643513ft
feet 2.0-3.060.8 Cross Slope (Driveway)SF361.9to $40 $1321643523ft
feet 5.0-6.064.3 Cross Slope (Driveway)SF1268.4to $40 $4921643533ft
feet -.6470.8 Vertical Change REF371.8to140196 3 ft
feet 3.0-4.071.4 Cross Slope (Driveway)SF874.1to $40 $3241643543ft
feet 4.0-5.076.2 Cross Slope (Driveway)SF3487.5to $40 $1,3561643553ft
feet 2.0-3.088.6 Cross Slope (Driveway)SF389.7to $40 $1321643563ft
feet .3492.7 Vertical Change REF393.7to140197 3 ft
feet 4.0-5.092.7 Cross Slope (PAR)SF794.9to $120 $7921643573ft
feet 2.0-3.095.7 Cross Slope (PAR)SF15100.8to $120 $1,8361643583ft
feet 1.298.1 Vertical Change REF399.1to140198 3 ft
feet 4.0-5.0102.5 Cross Slope (PAR)SF9105.5to $120 $1,0801643593ft
feet 3.0-4.0109.0 Cross Slope (PAR)SF5110.5to $120 $5401643603ft
$15,885.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
670
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S DISTRICT BLVD
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
HELIOTROPE AVE
End Street Name
2001281117
Run ID
District Blvd
55
ID Sidewalk Width
Priority
feet 2.0-3.07.0 Cross Slope (PAR)SF79.3to $120 $8281643613ft
feet 3.0-4.013.4 Cross Slope (PAR)SF2220.7to $120 $2,6281643623ft
feet .3213.7 Vertical Change REF314.7to140199 3 ft
feet 5.0-6.020.7 Cross Slope (PAR)SF3733.1to $120 $4,4641643633ft
feet 4.0-5.036.1 Cross Slope (PAR)SF537.8to $120 $6121643643ft
feet 5.0-6.040.4 Cross Slope (PAR)SF542.0to $120 $5761643653ft
feet 3.0-4.042.4 Cross Slope (PAR)SF1547.5to $120 $1,8361643663ft
feet 2.0-3.047.9 Cross Slope (PAR)SF11084.7to $120 $13,2481643673ft
feet 1.2948.6 Vertical Change REF349.6to140200 3 ft
feet .3465.6 Vertical Change REF366.6to140201 3 ft
feet 4.0-5.084.8 Cross Slope (PAR)SF2994.5to $120 $3,4921643683ft
feet 4.0-5.096.8 Cross Slope (PAR)SF698.8to $120 $7201643693ft
feet .54102.3 Vertical Change SF3103.3to $75 $2251402033ft
feet 4.0-5.0107.0 Cross Slope (PAR)SF12110.9to $120 $1,4041643703ft
feet 2.0-3.0110.9 Cross Slope (PAR)SF11114.4to $120 $1,2601643713ft
$31,293.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
671
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191048
Run ID
District Blvd
56.5
ID Sidewalk Width
Priority
feet0.0 Driveway19.0to165289
feet0.0 Driveway147.5to165290
feet 2.0-3.019.4 Cross Slope (Driveway)SF19339.7to $40 $7,71414900610ft
feet 4.0-5.040.6 Cross Slope (Driveway)SF1342.0to $40 $53214900710ft
feet 6.0-7.043.4 Cross Slope (Driveway)SF1044.5to $40 $41814900810ft
feet 3.0-4.047.7 Cross Slope (Driveway)SF1148.9to $40 $45614900910ft
feet 2.0-3.051.3 Cross Slope (Driveway)SF5056.6to $40 $2,01414901010ft
feet 2.0-3.062.5 Cross Slope (Driveway)SF5268.0to $40 $2,09014901110ft
feet 3.0-4.077.2 Cross Slope (Driveway)SF2980.3to $40 $1,17814901210ft
feet 2.0-3.080.8 Cross Slope (Driveway)SF1081.8to $40 $38014901310ft
feet 2.0-3.095.5 Cross Slope (Driveway)SF135109.7to $40 $5,39614901410ft
feet 3.0-4.0114.0 Cross Slope (Driveway)SF30117.2to $40 $1,21614901510ft
feet 2.0-3.0118.9 Cross Slope (Driveway)SF25121.5to $40 $98814901610ft
feet 2.0-3.0126.0 Cross Slope (Driveway)SF13127.4to $40 $53214901710ft
$22,914.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
672
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING (4949 DISTRICT
BLVD)
End Street Name
1912191054
Run ID
District Blvd
68.5
ID Sidewalk Width
Priority
feet 2.0-3.00.4 Cross Slope (PAR)SF404.6to $120 $4,78814897110ft
feet 2.0-3.07.8 Cross Slope (PAR)SF11820.2to $120 $14,13614897210ft
feet 2.0-3.022.8 Cross Slope (PAR)SF1624.5to $120 $1,93814897310ft
feet28.8 Driveway55.6to165285
feet 2.0-3.056.8 Cross Slope (PAR)SF8365.5to $120 $9,91814897410ft
feet 2.0-3.072.0 Cross Slope (PAR)SF1773.8to $120 $2,05214897510ft
feet73.8 Driveway107.3to165286
feet -.31107.7 Vertical Change LF10108.7to $75 $71313614110ft
feet .32110.0 Vertical Change REF10111.0to136142 10 ft
feet 5.0-6.0110.6 Cross Slope (PAR)SF11111.8to $120 $1,36814897610ft
feet 3.0-4.0112.2 Cross Slope (PAR)SF65119.0to $120 $7,75214897710ft
feet 2.0-3.0119.0 Cross Slope (PAR)SF48124.0to $120 $5,70014897810ft
feet 2.0-3.0131.3 Cross Slope (PAR)SF80139.7to $120 $9,57614897910ft
feet 2.0-3.0145.7 Cross Slope (PAR)SF46150.5to $120 $5,47214898010ft
feet 2.0-3.0155.6 Cross Slope (PAR)SF45160.3to $120 $5,35814898110ft
feet 2.0-3.0167.2 Cross Slope (PAR)SF39171.3to $120 $4,67414898210ft
feet 2.0-3.0179.8 Cross Slope (PAR)SF92189.5to $120 $11,05814898310ft
feet 2.0-3.0243.9 Cross Slope (PAR)SF35247.6to $120 $4,21814898410ft
feet 2.0-3.0251.9 Cross Slope (PAR)SF65258.7to $120 $7,75214898510ft
feet 2.0-3.0261.8 Cross Slope (PAR)SF100272.3to $120 $11,97014898610ft
feet 1.36273.6 Vertical Change SF10274.6to $75 $71313614310ft
feet 2.0-3.0275.3 Cross Slope (PAR)SF15276.9to $120 $1,82414898710ft
feet 2.0-3.0286.5 Cross Slope (PAR)SF126299.8to $120 $15,16214898810ft
feet -.55290.4 Vertical Change REF10291.4to136144 10 ft
feet 3.0-4.0337.9 Cross Slope (PAR)SF33341.4to $120 $3,99014898910ft
feet 2.0-3.0342.4 Cross Slope (PAR)SF14343.9to $120 $1,71014899010ft
feet 2.0-3.0359.3 Cross Slope (PAR)SF16361.0to $120 $1,93814899110ft
feet 2.0-3.0364.3 Cross Slope (PAR)SF38368.3to $120 $4,56014899210ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
673
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING (4949 DISTRICT
BLVD)
End Street Name
1912191054
Run ID
District Blvd
68.5
ID Sidewalk Width
Priority
feet 2.0-3.0371.3 Cross Slope (PAR)SF36375.1to $120 $4,33214899310ft
feet 2.0-3.0385.8 Cross Slope (PAR)SF43390.3to $120 $5,13014899410ft
feet 2.0-3.0393.8 Cross Slope (PAR)SF29396.8to $120 $3,42014899510ft
feet406.2 Driveway430.0to165287
feet406.2 Driveway558.2to165288
feet 3.0-4.0430.3 Cross Slope (Driveway)SF26433.0to $40 $1,02614899610ft
feet 2.0-3.0433.6 Cross Slope (Driveway)SF10434.6to $40 $38014899710ft
feet 3.0-4.0438.8 Cross Slope (Driveway)SF29441.8to $40 $1,14014899810ft
feet .27441.7 Vertical Change REF10442.7to136145 10 ft
feet 2.0-3.0443.6 Cross Slope (Driveway)SF46448.4to $40 $1,82414899910ft
feet 2.0-3.0451.3 Cross Slope (Driveway)SF11452.5to $40 $45614900010ft
feet 2.0-3.0455.3 Cross Slope (Driveway)SF28458.2to $40 $1,10214900110ft
feet 2.0-3.0488.9 Cross Slope (Driveway)SF51494.3to $40 $2,05214900210ft
feet 2.0-3.0500.3 Cross Slope (Driveway)SF52505.8to $40 $2,09014900310ft
feet 2.0-3.0516.2 Cross Slope (Driveway)SF27519.0to $40 $1,06414900410ft
feet 2.0-3.0536.3 Cross Slope (Driveway)SF15537.9to $40 $60814900510ft
$162,963.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
674
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
GIFFORD AVE
End Street Name
1912190859
Run ID
District Blvd
40
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF282.9to $120 $3,39314936010ft
feet 2.0-3.05.8 Cross Slope (PAR)SF248.3to $120 $2,92514936110ft
feet 2.0-3.037.2 Cross Slope (PAR)SF3640.9to $120 $4,32914936210ft
feet 2.0-3.053.8 Cross Slope (PAR)SF8862.8to $120 $10,53014936310ft
feet 2.0-3.068.3 Cross Slope (PAR)SF6775.2to $120 $8,07314936410ft
feet 2.0-3.077.5 Cross Slope (PAR)SF10888.6to $120 $12,98714936510ft
feet94.2 Driveway118.8to165313
feet .37122.3 Vertical Change LF10123.3to $75 $73113623210ft
feet 2.0-3.0123.4 Cross Slope (PAR)SF164140.2to $120 $19,65614936610ft
feet 3.0-4.0145.3 Cross Slope (PAR)SF14146.7to $120 $1,63814936710ft
feet 2.0-3.0147.8 Cross Slope (PAR)SF47152.6to $120 $5,61614936810ft
feet 2.0-3.0155.0 Cross Slope (PAR)SF16156.6to $120 $1,87214936910ft
feet 2.0-3.0158.8 Cross Slope (PAR)SF83167.3to $120 $9,94514937010ft
feet 4.0-5.0167.3 Cross Slope (PAR)SF21169.5to $120 $2,57414937110ft
feet 2.0-3.0181.6 Cross Slope (PAR)SF70188.8to $120 $8,42414937210ft
feet 3.0-4.0192.1 Cross Slope (PAR)SF82200.5to $120 $9,82814937310ft
feet 2.0-3.0200.5 Cross Slope (PAR)SF19202.4to $120 $2,22314937410ft
$104,744.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
675
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 49TH ST
End Street Name
1912190907
Run ID
District Blvd
49
ID Sidewalk Width
Priority
feet 2.0-3.010.4 Cross Slope (PAR)SF2412.9to $120 $2,92514932510ft
feet 2.0-3.016.5 Cross Slope (PAR)SF16233.1to $120 $19,42214932610ft
feet 3.0-4.047.9 Cross Slope (PAR)SF2250.2to $120 $2,69114932710ft
feet 2.0-3.051.3 Cross Slope (PAR)SF2053.4to $120 $2,45714932810ft
feet -.2957.9 Vertical Change LF1058.9to $75 $73113622410ft
feet 1.7460.2 Vertical Change SF1061.2to $75 $73113622510ft
feet 2.0-3.063.6 Cross Slope (PAR)SF1665.2to $120 $1,87214932910ft
feet .3765.0 Vertical Change REF1066.0to136226 10 ft
feet 2.0-3.070.1 Cross Slope (PAR)SF1471.5to $120 $1,63814933010ft
feet 2.0-3.074.5 Cross Slope (PAR)SF3277.8to $120 $3,86114933110ft
feet 2.0-3.080.3 Cross Slope (PAR)SF1882.1to $120 $2,10614933210ft
feet84.5 Driveway109.3to165310
feet .3686.4 Vertical Change REF1087.4to136227 10 ft
feet 2.0-3.0112.0 Cross Slope (PAR)SF61118.3to $120 $7,37114933310ft
feet 2.0-3.0120.8 Cross Slope (PAR)SF37124.6to $120 $4,44614933410ft
feet 2.0-3.0129.6 Cross Slope (PAR)SF88138.6to $120 $10,53014933510ft
feet 2.0-3.0146.8 Cross Slope (PAR)SF24149.3to $120 $2,92514933610ft
feet 2.0-3.0153.0 Cross Slope (PAR)SF27155.8to $120 $3,27614933710ft
feet 3.0-4.0177.1 Cross Slope (PAR)SF12178.3to $120 $1,40414933810ft
feet 4.0-5.0183.7 Cross Slope (PAR)SF98193.8to $120 $11,81714933910ft
$80,203.50TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
676
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
E 50TH ST
End Street Name
1912190913
Run ID
District Blvd
50.5
ID Sidewalk Width
Priority
feet 2.0-3.02.1 Cross Slope (PAR)SF325.4to $120 $3,86114928810ft
feet 2.0-3.08.4 Cross Slope (PAR)SF4813.3to $120 $5,73314928910ft
feet 2.0-3.018.0 Cross Slope (PAR)SF4222.3to $120 $5,03114929010ft
feet 2.0-3.025.3 Cross Slope (PAR)SF11437.0to $120 $13,68914929110ft
feet 3.0-4.039.3 Cross Slope (PAR)SF2441.8to $120 $2,92514929210ft
feet 2.0-3.042.0 Cross Slope (PAR)SF1343.3to $120 $1,52114929310ft
feet 2.0-3.047.1 Cross Slope (PAR)SF12960.3to $120 $15,44414929410ft
feet 2.0-3.072.5 Cross Slope (PAR)SF5678.2to $120 $6,66914929510ft
feet 2.0-3.080.7 Cross Slope (PAR)SF6487.3to $120 $7,72214929610ft
feet 2.0-3.091.9 Cross Slope (PAR)SF1293.1to $120 $1,40414929710ft
feet 3.0-4.095.8 Cross Slope (PAR)SF53101.2to $120 $6,31814929810ft
feet 5.0-6.0101.2 Cross Slope (PAR)SF16102.8to $120 $1,87214929910ft
feet 3.0-4.0104.3 Cross Slope (PAR)SF11105.4to $120 $1,28714930010ft
feet 2.0-3.0105.4 Cross Slope (PAR)SF23107.8to $120 $2,80814930110ft
feet 2.0-3.0110.0 Cross Slope (PAR)SF115121.8to $120 $13,80614930210ft
feet .26126.3 Vertical Change LF10127.3to $75 $73113621710ft
feet -.41128.9 Vertical Change LF10129.9to $75 $73113621810ft
feet 3.0-4.0133.8 Cross Slope (PAR)SF20135.9to $120 $2,45714930310ft
feet 2.0-3.0139.5 Cross Slope (PAR)SF110150.8to $120 $13,22114930410ft
feet -.29140.4 Vertical Change REF10141.4to136219 10 ft
feet 3.0-4.0163.1 Cross Slope (PAR)SF13164.4to $120 $1,52114930510ft
feet 2.0-3.0166.0 Cross Slope (PAR)SF31169.2to $120 $3,74414930610ft
feet 2.0-3.0173.3 Cross Slope (PAR)SF10174.3to $120 $1,17014930710ft
feet 3.0-4.0176.8 Cross Slope (PAR)SF99187.0to $120 $11,93414930810ft
feet 5.0-6.0187.0 Cross Slope (PAR)SF29190.0to $120 $3,51014930910ft
feet 4.0-5.0192.8 Cross Slope (PAR)SF59198.8to $120 $7,02014931010ft
$136,129.50TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
677
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
FRUITLAND AVE
End Street Name
1912190927
Run ID
District Blvd
69.5
ID Sidewalk Width
Priority
feet 2.0-3.00.4 Cross Slope (PAR)SF14534.6to $120 $17,4421492274ft
feet9.8 Continuous Width REF410.8to167197 4 ft
feet31.0 Continuous Width REF432.0to167198 4 ft
feet33.9 Continuous Width SF434.9to $120 $5101672914ft
feet 5.0-6.035.3 Cross Slope (PAR)SF1538.8to $120 $1,7851492284ft
feet 3.0-4.038.8 Cross Slope (PAR)SF2043.4to $120 $2,3461492294ft
feet 2.0-3.044.6 Cross Slope (PAR)SF3753.2to $120 $4,3861492304ft
feet 4.0-5.053.8 Cross Slope (PAR)SF1356.8to $120 $1,5301492314ft
feet 2.0-3.056.8 Cross Slope (PAR)SF1660.5to $120 $1,8871492324ft
feet 2.0-3.062.7 Cross Slope (PAR)SF563.9to $120 $6121492334ft
feet 4.0-5.065.3 Cross Slope (PAR)SF9687.9to $120 $11,5261492344ft
feet70.4 Continuous Width SF471.4to $120 $5101675774ft
feet 3.0-4.091.3 Cross Slope (PAR)SF592.5to $120 $6121492354ft
feet 5.0-6.094.3 Cross Slope (PAR)SF1196.8to $120 $1,2751492364ft
feet 3.0-4.097.8 Cross Slope (PAR)SF57111.3to $120 $6,8851492374ft
feet -.31108.9 Vertical Change REF4109.9to136211 4 ft
feet 3.0-4.0116.3 Cross Slope (PAR)SF4117.3to $120 $5101492384ft
feet 2.0-3.0117.3 Cross Slope (PAR)SF75135.0to $120 $9,0271492394ft
feet 3.0-4.0140.6 Cross Slope (PAR)SF10143.0to $120 $1,2241492404ft
feet 2.0-3.0143.0 Cross Slope (PAR)SF6144.3to $120 $6631492414ft
feet145.8 Continuous Width REF4146.8to167217 4 ft
feet 2.0-3.0149.2 Cross Slope (PAR)SF5150.3to $120 $5611492424ft
feet 3.0-4.0153.0 Cross Slope (PAR)SF23158.3to $120 $2,7031492434ft
feet -.31153.7 Vertical Change REF4154.7to136212 4 ft
feet 5.0-6.0159.9 Cross Slope (PAR)SF9162.0to $120 $1,0711492444ft
feet 4.0-5.0168.2 Cross Slope (PAR)SF37176.8to $120 $4,3861492454ft
feet 5.0-6.0180.3 Cross Slope (PAR)SF6181.8to $120 $7651492464ft
$72,216.00TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
678
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE / N DISTRICT BLVD
Street Side
TRAIN CROSSING (4735
DISTRICT BLVD)
Survey Street Name Starting Street Name
CORONA AVE
End Street Name
1912191116
Run ID
District Blvd
52
ID Sidewalk Width
Priority
feet2.7 Driveway59.5to165275
feet 2.0-3.059.5 Cross Slope (Driveway)SF9369.3to $40 $3,72414884610ft
feet 3.0-4.073.8 Cross Slope (PAR)SF5079.1to $120 $6,04214884710ft
feet 4.0-5.081.3 Cross Slope (PAR)SF4485.9to $120 $5,24414884810ft
feet 2.0-3.087.3 Cross Slope (PAR)SF133101.3to $120 $15,96014884910ft
feet105.4 Driveway125.6to165276
feet 2.0-3.0150.7 Cross Slope (PAR)SF10151.8to $120 $1,25414885010ft
feet 2.0-3.0166.2 Cross Slope (PAR)SF28169.1to $120 $3,30614885110ft
feet 2.0-3.0173.2 Cross Slope (PAR)SF10174.3to $120 $1,25414885210ft
feet 2.0-3.0182.2 Cross Slope (PAR)SF21184.4to $120 $2,50814885310ft
feet 2.0-3.0208.4 Cross Slope (PAR)SF40212.6to $120 $4,78814885410ft
feet 2.0-3.0229.5 Cross Slope (PAR)SF74237.3to $120 $8,89214885510ft
feet 2.0-3.0254.1 Cross Slope (PAR)SF29257.1to $120 $3,42014885610ft
feet270.0 Cold Patch 37273.9to140359 10 ft
feet 3.0-4.0275.8 Cross Slope (PAR)SF15277.4to $120 $1,82414885710ft
feet 2.0-3.0286.0 Cross Slope (PAR)SF22288.3to $120 $2,62214885810ft
feet 4.0-5.0289.9 Cross Slope (PAR)SF36293.7to $120 $4,33214885910ft
feet 2.0-3.0294.3 Cross Slope (PAR)SF76302.3to $120 $9,12014886010ft
feet 2.0-3.0310.3 Cross Slope (PAR)SF26313.0to $120 $3,07814886110ft
feet 4.0-5.0313.5 Cross Slope (PAR)SF64320.2to $120 $7,63814886210ft
feet 2.0-3.0320.4 Cross Slope (PAR)SF67327.5to $120 $8,09414886310ft
feet .39331.5 Vertical Change REF10332.5to136111 10 ft
feet 2.0-3.0331.9 Cross Slope (PAR)SF16333.6to $120 $1,93814886410ft
feet 2.0-3.0341.5 Cross Slope (PAR)SF39345.6to $120 $4,67414886510ft
feet 2.0-3.0351.8 Cross Slope (PAR)SF34355.4to $120 $4,10414886610ft
feet 4.0-5.0355.4 Cross Slope (PAR)SF101366.0to $120 $12,08414886710ft
feet .82356.9 Vertical Change REF10357.9to136112 10 ft
feet 1.39363.9 Vertical Change REF10364.9to136113 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
679
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE / N DISTRICT BLVD
Street Side
TRAIN CROSSING (4735
DISTRICT BLVD)
Survey Street Name Starting Street Name
CORONA AVE
End Street Name
1912191116
Run ID
District Blvd
52
ID Sidewalk Width
Priority
feet 2.0-3.0366.0 Cross Slope (PAR)SF56371.9to $120 $6,72614886810ft
feet 2.0-3.0379.7 Cross Slope (PAR)SF37383.6to $120 $4,44614886910ft
feet383.6 Driveway397.4to165277
feet 2.83399.8 Vertical Change REF10400.8to136114 10 ft
feet 2.0-3.0400.3 Cross Slope (PAR)SF149416.0to $120 $17,89814887010ft
feet 4.0-5.0416.8 Cross Slope (PAR)SF35420.5to $120 $4,21814887110ft
feet 2.0-3.0421.2 Cross Slope (PAR)SF37425.1to $120 $4,44614887210ft
feet 4.0-5.0425.3 Cross Slope (PAR)SF28428.2to $120 $3,30614887310ft
feet429.5 Driveway456.5to165278
feet -.38443.5 Vertical Change REF10444.5to136115 10 ft
feet 2.0-3.0458.4 Cross Slope (PAR)SF10459.4to $120 $1,14014887410ft
feet 2.0-3.0461.8 Cross Slope (PAR)SF46466.6to $120 $5,47214887510ft
feet 2.0-3.0469.8 Cross Slope (PAR)SF55475.6to $120 $6,61214887610ft
feet 3.0-4.0477.9 Cross Slope (PAR)SF16479.6to $120 $1,93814887710ft
feet 2.0-3.0480.5 Cross Slope (PAR)SF50485.8to $120 $6,04214887810ft
feet 3.0-4.0488.5 Cross Slope (PAR)SF454536.3to $120 $54,49214887910ft
feet 2.0-3.0537.3 Cross Slope (PAR)SF68544.5to $120 $8,20814888010ft
feet 4.0-5.0545.8 Cross Slope (PAR)SF96555.9to $120 $11,51414888110ft
feet 2.0-3.0556.3 Cross Slope (PAR)SF104567.2to $120 $12,42614888210ft
feet 2.0-3.0569.7 Cross Slope (PAR)SF99580.1to $120 $11,85614888310ft
feet580.1 Cold Patch 39584.2to140360 10 ft
feet 4.0-5.0586.7 Cross Slope (PAR)SF48591.8to $120 $5,81414888410ft
feet 2.0-3.0592.3 Cross Slope (PAR)SF57598.3to $120 $6,84014888510ft
feet598.5 Driveway642.3to165279
feet 3.0-4.0644.8 Cross Slope (PAR)SF10645.8to $120 $1,14014888610ft
feet 3.0-4.0648.8 Cross Slope (PAR)SF50654.1to $120 $6,04214888710ft
feet 2.0-3.0654.6 Cross Slope (PAR)SF108666.0to $120 $12,99614888810ft
feet 3.0-4.0668.8 Cross Slope (PAR)SF15670.4to $120 $1,82414888910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
680
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE / N DISTRICT BLVD
Street Side
TRAIN CROSSING (4735
DISTRICT BLVD)
Survey Street Name Starting Street Name
CORONA AVE
End Street Name
1912191116
Run ID
District Blvd
52
ID Sidewalk Width
Priority
feet 2.0-3.0671.3 Cross Slope (PAR)SF46676.1to $120 $5,47214889010ft
feet677.7 Driveway721.8to165280
feet677.7 Driveway735.3to165281
feet 2.0-3.0722.3 Cross Slope (Driveway)SF29725.3to $40 $1,14014889110ft
feet 3.0-4.0728.9 Cross Slope (Driveway)SF58735.0to $40 $2,31814889210ft
$320,226.00TOTAL COST FOR:DISTRICT BLVDNE / N side of Starting at:TRAIN CROSSING (4735
DISTRICT BLVD)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
681
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING (4825
DISTRICT BLVD)
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191107
Run ID
District Blvd
67.75
ID Sidewalk Width
Priority
feet 2.0-3.01.4 Cross Slope (PAR)SF20222.7to $120 $24,28214889310ft
feet 7.0-8.011.3 Running Slope REF2914.3to166467 10 ft
feet 2.0-3.025.3 Cross Slope (PAR)SF8334.0to $120 $9,91814889410ft
feet .2630.9 Vertical Change REF1031.9to136116 10 ft
feet 4.0-5.037.4 Cross Slope (PAR)SF4742.3to $120 $5,58614889510ft
feet 2.0-3.042.3 Cross Slope (PAR)SF1143.5to $120 $1,36814889610ft
feet 3.0-4.051.4 Cross Slope (PAR)SF1452.9to $120 $1,71014889710ft
feet 2.0-3.054.4 Cross Slope (PAR)SF2857.3to $120 $3,30614889810ft
feet 3.0-4.059.5 Cross Slope (PAR)SF5865.6to $120 $6,95414889910ft
feet 5.0-6.065.6 Cross Slope (PAR)SF2267.9to $120 $2,62214890010ft
feet 2.0-3.069.3 Cross Slope (PAR)SF5875.4to $120 $6,95414890110ft
feet 2.0-3.083.6 Cross Slope (PAR)SF4087.8to $120 $4,78814890210ft
feet 2.0-3.090.2 Cross Slope (PAR)SF5395.8to $120 $6,38414890310ft
feet 2.0-3.0100.5 Cross Slope (PAR)SF57106.5to $120 $6,84014890410ft
feet 4.0-5.0106.5 Cross Slope (PAR)SF50111.8to $120 $6,04214890510ft
feet 2.0-3.0114.3 Cross Slope (PAR)SF22116.6to $120 $2,62214890610ft
feet .44114.6 Vertical Change REF10115.6to136117 10 ft
feet .87127.4 Vertical Change SF10128.4to $75 $71313611810ft
feet 2.0-3.0131.9 Cross Slope (PAR)SF51137.3to $120 $6,15614890710ft
feet 2.0-3.0143.1 Cross Slope (PAR)SF64149.8to $120 $7,63814890810ft
feet 4.0-5.0149.8 Cross Slope (PAR)SF13151.2to $120 $1,59614890910ft
feet 3.0-4.0153.3 Cross Slope (PAR)SF20155.4to $120 $2,39414891010ft
feet 2.0-3.0155.8 Cross Slope (PAR)SF222179.2to $120 $26,67614891110ft
feet 4.0-5.0179.2 Cross Slope (PAR)SF32182.6to $120 $3,87614891210ft
feet183.4 Driveway232.7to165282
feet -.26188.8 Vertical Change REF10189.8to136119 10 ft
feet .81221.5 Vertical Change REF10222.5to136120 10 ft
feet 2.68227.7 Vertical Change REF10228.7to136121 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
682
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING (4825
DISTRICT BLVD)
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912191107
Run ID
District Blvd
67.75
ID Sidewalk Width
Priority
feet 3.0-4.0233.8 Cross Slope (PAR)SF61240.2to $120 $7,29614891310ft
feet 2.0-3.0240.8 Cross Slope (PAR)SF12242.1to $120 $1,48214891410ft
feet 2.0-3.0255.3 Cross Slope (PAR)SF17257.1to $120 $2,05214891510ft
feet .48261.8 Vertical Change LF10262.8to $75 $71313612210ft
feet .75318.8 Vertical Change SF10319.8to $75 $71313612310ft
feet 1.18390.3 Vertical Change SF10391.3to $75 $71313612410ft
feet -.33420.3 Vertical Change LF10421.3to $75 $71313612510ft
feet 2.0-3.0431.5 Cross Slope (PAR)SF119444.0to $120 $14,25014891610ft
feet 2.0-3.0446.4 Cross Slope (PAR)SF71453.9to $120 $8,55014891710ft
feet 3.0-4.0456.9 Cross Slope (PAR)SF80465.3to $120 $9,57614891810ft
feet 2.0-3.0467.7 Cross Slope (PAR)SF18469.6to $120 $2,16614891910ft
feet 3.0-4.0471.8 Cross Slope (PAR)SF131485.6to $120 $15,73214892010ft
feet485.7 Driveway514.0to165283
feet 2.0-3.0516.8 Cross Slope (PAR)SF304548.8to $120 $36,48014892110ft
feet 2.0-3.0559.4 Cross Slope (PAR)SF68566.6to $120 $8,20814892210ft
feet .28568.8 Vertical Change LF10569.8to $75 $71313612610ft
$247,779.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING (4825
DISTRICT BLVD)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
683
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING (4949
DISTRICT BLVD)
Survey Street Name Starting Street Name
TRAIN CROSSING (4825 DISTRICT
BLVD)
End Street Name
1912191101
Run ID
District Blvd
61.75
ID Sidewalk Width
Priority
feet 3.0-4.01.3 Cross Slope (PAR)SF14316.3to $120 $17,10014892310ft
feet 5.0-6.016.3 Cross Slope (PAR)SF3820.3to $120 $4,56014892410ft
feet 2.917.5 Vertical Change SF1018.5to $75 $71313612710ft
feet 3.0-4.020.7 Cross Slope (PAR)SF1121.9to $120 $1,36814892510ft
feet 3.0-4.024.2 Cross Slope (PAR)SF5630.1to $120 $6,72614892610ft
feet 2.0-3.030.9 Cross Slope (PAR)SF13745.3to $120 $16,41614892710ft
feet .6648.2 Vertical Change SF1049.2to $75 $71313612810ft
feet 3.0-4.050.3 Cross Slope (PAR)SF9059.8to $120 $10,83014892810ft
feet 2.0-3.059.8 Cross Slope (PAR)SF1060.8to $120 $1,14014892910ft
feet 2.0-3.063.3 Cross Slope (PAR)SF5969.5to $120 $7,06814893010ft
feet 4.0-5.072.2 Cross Slope (PAR)SF4877.2to $120 $5,70014893110ft
feet 2.0-3.077.7 Cross Slope (PAR)SF215100.3to $120 $25,76414893210ft
feet 3.0-4.0102.5 Cross Slope (PAR)SF46107.3to $120 $5,47214893310ft
feet 2.0-3.0107.3 Cross Slope (PAR)SF238132.4to $120 $28,61414893410ft
feet 4.0-5.0132.4 Cross Slope (PAR)SF26135.1to $120 $3,07814893510ft
feet .26134.0 Vertical Change REF10135.0to136129 10 ft
feet 3.0-4.0139.1 Cross Slope (PAR)SF128152.6to $120 $15,39014893610ft
feet 2.0-3.0153.3 Cross Slope (PAR)SF157169.8to $120 $18,81014893710ft
feet 4.0-5.0171.2 Cross Slope (PAR)SF49176.4to $120 $5,92814893810ft
feet .27180.2 Vertical Change LF10181.2to $75 $71313613010ft
feet 2.0-3.0183.8 Cross Slope (PAR)SF70191.2to $120 $8,43614893910ft
feet 2.0-3.0194.9 Cross Slope (PAR)SF143210.0to $120 $17,21414894010ft
feet 3.0-4.0214.4 Cross Slope (PAR)SF68221.6to $120 $8,20814894110ft
feet 2.0-3.0222.0 Cross Slope (PAR)SF16223.7to $120 $1,93814894210ft
feet 3.0-4.0230.3 Cross Slope (PAR)SF41234.6to $120 $4,90214894310ft
feet -.48233.3 Vertical Change REF10234.3to136131 10 ft
feet 5.0-6.0234.6 Cross Slope (PAR)SF53240.2to $120 $6,38414894410ft
feet .28242.5 Vertical Change REF10243.5to136132 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
684
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING (4949
DISTRICT BLVD)
Survey Street Name Starting Street Name
TRAIN CROSSING (4825 DISTRICT
BLVD)
End Street Name
1912191101
Run ID
District Blvd
61.75
ID Sidewalk Width
Priority
feet 4.0-5.0242.9 Cross Slope (PAR)SF82251.5to $120 $9,80414894510ft
feet 2.0-3.0251.5 Cross Slope (PAR)SF189271.4to $120 $22,68614894610ft
feet .64254.8 Vertical Change REF10255.8to136133 10 ft
feet 2.0-3.0275.3 Cross Slope (PAR)SF41279.6to $120 $4,90214894710ft
feet 2.0-3.0282.2 Cross Slope (PAR)SF16283.9to $120 $1,93814894810ft
feet -.28283.3 Vertical Change REF10284.3to136135 10 ft
feet 2.0-3.0286.1 Cross Slope (PAR)SF144301.3to $120 $17,32814894910ft
feet 2.0-3.0305.8 Cross Slope (PAR)SF62312.3to $120 $7,41014895010ft
feet 2.0-3.0315.0 Cross Slope (PAR)SF48320.1to $120 $5,81414895110ft
feet 4.0-5.0321.4 Cross Slope (PAR)SF231345.7to $120 $27,70214895210ft
feet -.28331.4 Vertical Change REF10332.4to136136 10 ft
feet -.31340.9 Vertical Change REF10341.9to136137 10 ft
feet 2.0-3.0346.8 Cross Slope (PAR)SF28349.7to $120 $3,30614895310ft
feet .48350.5 Vertical Change LF10351.5to $75 $71313613810ft
feet 2.0-3.0353.8 Cross Slope (PAR)SF21356.0to $120 $2,50814895410ft
feet 3.0-4.0373.8 Cross Slope (PAR)SF14375.3to $120 $1,71014895510ft
feet 2.0-3.0376.8 Cross Slope (PAR)SF22379.1to $120 $2,62214895610ft
feet 2.0-3.0383.3 Cross Slope (PAR)SF40387.5to $120 $4,78814895710ft
feet390.9 Driveway424.8to165284
feet 4.0-5.0425.3 Cross Slope (Driveway)SF106436.5to $40 $4,25614895810ft
feet -.31427.0 Vertical Change REF10428.0to136139 10 ft
feet 2.0-3.0437.0 Cross Slope (PAR)SF48442.1to $120 $5,81414895910ft
feet 4.0-5.0442.1 Cross Slope (PAR)SF26444.8to $120 $3,07814896010ft
feet 2.0-3.0446.1 Cross Slope (PAR)SF275475.0to $120 $32,94614896110ft
feet 2.0-3.0477.1 Cross Slope (PAR)SF74484.9to $120 $8,89214896210ft
feet 2.0-3.0487.0 Cross Slope (PAR)SF123499.9to $120 $14,70614896310ft
feet 3.0-4.0502.1 Cross Slope (PAR)SF22504.4to $120 $2,62214896410ft
feet 2.0-3.0504.4 Cross Slope (PAR)SF67511.5to $120 $8,09414896510ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
685
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE DISTRICT BLVD
Street Side
TRAIN CROSSING (4949
DISTRICT BLVD)
Survey Street Name Starting Street Name
TRAIN CROSSING (4825 DISTRICT
BLVD)
End Street Name
1912191101
Run ID
District Blvd
61.75
ID Sidewalk Width
Priority
feet .38505.8 Vertical Change REF10506.8to136140 10 ft
feet 4.0-5.0511.5 Cross Slope (PAR)SF55517.3to $120 $6,61214896610ft
feet 2.0-3.0517.3 Cross Slope (PAR)SF10518.4to $120 $1,25414896710ft
feet 4.0-5.0520.3 Cross Slope (PAR)SF52525.8to $120 $6,27014896810ft
feet 2.0-3.0531.4 Cross Slope (PAR)SF13532.8to $120 $1,59614896910ft
feet 5.0-6.0537.8 Running Slope SF10538.8to $120 $1,14016646810ft
feet 3.0-4.0540.3 Cross Slope (PAR)SF83549.0to $120 $9,91814897010ft
$443,612.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING (4949
DISTRICT BLVD)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
686
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW DISTRICT BLVD
Street Side
TRAIN CROSSING (AFTER
DISTRICT BLVD)
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1912190922
Run ID
District Blvd
55
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF111.1to $120 $1,28714924710ft
feet 2.0-3.01.1 Cross Slope (PAR)SF253.7to $120 $3,04214924810ft
feet .975.9 Vertical Change SF106.9to $75 $73113621310ft
feet 4.0-5.09.0 Cross Slope (PAR)SF7716.9to $120 $9,24314924910ft
feet 2.0-3.016.9 Cross Slope (PAR)SF4821.8to $120 $5,73314925010ft
feet 2.0-3.031.0 Cross Slope (PAR)SF1332.3to $120 $1,52114925110ft
feet 2.0-3.045.3 Cross Slope (PAR)SF11557.1to $120 $13,80614925210ft
feet 2.0-3.063.3 Cross Slope (PAR)SF1364.6to $120 $1,52114925310ft
feet 2.0-3.077.7 Cross Slope (PAR)SF1579.2to $120 $1,75514925410ft
feet 2.0-3.096.0 Cross Slope (PAR)SF1997.9to $120 $2,22314925510ft
feet 2.0-3.0115.4 Cross Slope (PAR)SF364152.7to $120 $43,64114925610ft
feet 2.0-3.0155.0 Cross Slope (PAR)SF33158.4to $120 $3,97814925710ft
feet 3.0-4.0163.5 Cross Slope (PAR)SF11164.6to $120 $1,28714925810ft
feet 2.0-3.0166.6 Cross Slope (PAR)SF99176.8to $120 $11,93414925910ft
feet 4.0-5.0178.2 Cross Slope (PAR)SF20180.2to $120 $2,34014926010ft
feet 3.0-4.0183.0 Cross Slope (Driveway)SF10184.0to $40 $39014926110ft
feet 3.0-4.0186.3 Cross Slope (Driveway)SF20188.4to $40 $81914926210ft
feet 2.0-3.0188.4 Cross Slope (Driveway)SF82196.8to $40 $3,27614926310ft
feet 4.0-5.0197.3 Cross Slope (Driveway)SF124210.0to $40 $4,95314926410ft
feet 2.0-3.0210.0 Cross Slope (Driveway)SF62216.4to $40 $2,49614926510ft
feet 4.0-5.0218.1 Cross Slope (PAR)SF26220.8to $120 $3,15914926610ft
feet 2.0-3.0223.3 Cross Slope (PAR)SF85232.0to $120 $10,17914926710ft
feet 2.0-3.0237.5 Cross Slope (PAR)SF14238.9to $120 $1,63814926810ft
$130,952.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING (AFTER
DISTRICT BLVD)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
687
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
2120 E 25TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911221105
Run ID
E 25Th St
61.5
ID Sidewalk Width
Priority
feet 3.0-4.01.1 Cross Slope (PAR)SF13514.6to $120 $16,20014262110ft
feet 2.0-3.016.4 Cross Slope (PAR)SF13830.2to $120 $16,56014262210ft
feet 2.0-3.033.4 Cross Slope (PAR)SF9943.3to $120 $11,88014262310ft
feet 2.0-3.046.3 Cross Slope (PAR)SF19565.8to $120 $23,40014262410ft
feet 4.0-5.069.6 Cross Slope (PAR)SF8678.2to $120 $10,32014262510ft
feet79.0 Driveway95.1to164684
feet 3.0-4.096.7 Cross Slope (PAR)SF1798.4to $120 $2,04014262610ft
feet -.5497.4 Vertical Change REF1098.4to133798 10 ft
feet 2.0-3.098.4 Cross Slope (PAR)SF87107.1to $120 $10,44014262710ft
feet 2.0-3.0111.3 Cross Slope (PAR)SF30114.3to $120 $3,60014262810ft
feet .66114.9 Vertical Change SF10115.9to $75 $75013379910ft
feet 2.0-3.0121.0 Cross Slope (PAR)SF68127.8to $120 $8,16014262910ft
feet 2.0-3.0132.4 Cross Slope (PAR)SF19134.3to $120 $2,28014263010ft
feet 4.0-5.0138.0 Cross Slope (PAR)SF33141.3to $120 $3,96014263110ft
feet -.87141.8 Vertical Change REF10142.8to133800 10 ft
feet 6.0-7.0141.8 Cross Slope (PAR)SF22144.0to $120 $2,64014263210ft
feet 5.0-6.0144.0 Cross Slope (PAR)SF47148.7to $120 $5,64014263310ft
feet 3.0-4.0148.7 Cross Slope (PAR)SF29151.6to $120 $3,48014263410ft
feet 2.0-3.0152.3 Cross Slope (PAR)SF43156.6to $120 $5,16014263510ft
feet 4.0-5.0156.8 Cross Slope (PAR)SF84165.2to $120 $10,08014263610ft
feet 2.0-3.0165.2 Cross Slope (PAR)SF17166.9to $120 $2,04014263710ft
feet .67166.1 Vertical Change REF10167.1to133801 10 ft
feet 2.0-3.0176.9 Cross Slope (PAR)SF204197.3to $120 $24,48014263810ft
feet 2.0-3.0201.2 Cross Slope (PAR)SF150216.2to $120 $18,00014263910ft
feet217.8 Driveway235.5to164685
feet 2.89230.2 Vertical Change REF10231.2to133802 10 ft
feet 1.63234.5 Vertical Change REF10235.5to133803 10 ft
feet 4.0-5.0235.5 Cross Slope (Driveway)SF43239.8to $40 $1,72014264010ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
688
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
2120 E 25TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911221105
Run ID
E 25Th St
61.5
ID Sidewalk Width
Priority
feet239.8 Driveway282.6to164686
feet -.27267.9 Vertical Change REF10268.9to133804 10 ft
feet 4.0-5.0282.8 Cross Slope (Driveway)SF284311.2to $40 $11,36014264110ft
feet 2.0-3.0311.2 Cross Slope (PAR)SF164327.6to $120 $19,68014264210ft
feet 2.0-3.0329.7 Cross Slope (PAR)SF261355.8to $120 $31,32014264310ft
feet 2.0-3.0359.8 Cross Slope (PAR)SF70366.8to $120 $8,40014264410ft
feet 4.0-5.0366.8 Cross Slope (PAR)SF46371.4to $120 $5,52014264510ft
feet 2.95371.1 Vertical Change REF10372.1to133805 10 ft
feet 2.0-3.0371.7 Cross Slope (PAR)SF314403.1to $120 $37,68014264610ft
feet 2.0-3.0415.5 Cross Slope (PAR)SF52420.7to $120 $6,24014264710ft
feet 2.0-3.0428.1 Cross Slope (PAR)SF222450.3to $120 $26,64014264810ft
feet .34432.7 Vertical Change REF10433.7to133806 10 ft
feet .77446.9 Vertical Change REF10447.9to133807 10 ft
feet 2.0-3.0453.2 Cross Slope (PAR)SF161469.3to $120 $19,32014264910ft
feet472.3 Driveway569.5to164687
feet -.3504.0 Vertical Change REF10505.0to133808 10 ft
feet .26506.4 Vertical Change REF10507.4to133809 10 ft
feet .26512.3 Vertical Change REF10513.3to133810 10 ft
feet .31535.5 Vertical Change REF10536.5to133811 10 ft
feet 2.0-3.0569.7 Cross Slope (Driveway)SF116581.3to $40 $4,64014265010ft
feet581.3 Driveway626.4to164688
feet -.27594.9 Vertical Change REF10595.9to133812 10 ft
feet -.33622.4 Vertical Change REF10623.4to133814 10 ft
feet 3.0-4.0626.4 Cross Slope (Driveway)SF12627.6to $40 $48014265110ft
feet 2.0-3.0627.6 Cross Slope (PAR)SF145642.1to $120 $17,40014265210ft
feet 2.0-3.0646.0 Cross Slope (PAR)SF46650.6to $120 $5,52014265310ft
feet 3.0-4.0652.8 Cross Slope (PAR)SF12654.0to $120 $1,44014265410ft
feet 2.0-3.0654.0 Cross Slope (PAR)SF189672.9to $120 $22,68014265510ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
689
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
2120 E 25TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911221105
Run ID
E 25Th St
61.5
ID Sidewalk Width
Priority
feet 4.0-5.0672.9 Cross Slope (PAR)SF32676.1to $120 $3,84014265610ft
feet 2.0-3.0676.7 Cross Slope (PAR)SF60682.7to $120 $7,20014265710ft
feet 4.0-5.0682.7 Cross Slope (PAR)SF724755.1to $120 $86,88014265810ft
feet -.54737.6 Vertical Change REF10738.6to133815 10 ft
$499,070.00TOTAL COST FOR:E 25TH STSside of Starting at:2120 E 25TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
690
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
S ALAMEDA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221043
Run ID
E 25Th St
57.75
ID Sidewalk Width
Priority
feet 3.0-4.00.2 Cross Slope (PAR)SF14415.4to $120 $17,32814272010ft
feet -.311.5 Vertical Change REF102.5to133851 10 ft
feet 2.139.6 Vertical Change REF1010.6to133852 10 ft
feet 5.0-6.017.0 Cross Slope (PAR)SF7324.7to $120 $8,77814272110ft
feet 3.0-4.024.7 Cross Slope (PAR)SF18143.7to $120 $21,66014272210ft
feet .3242.4 Vertical Change REF1043.4to133853 10 ft
feet 3.0-4.046.3 Cross Slope (PAR)SF25673.2to $120 $30,66614272310ft
feet .4464.6 Vertical Change REF1065.6to133854 10 ft
feet .4573.9 Vertical Change LF1074.9to $75 $71313385510ft
feet 4.0-5.075.4 Cross Slope (PAR)SF12388.4to $120 $14,82014272410ft
feet -.4184.2 Vertical Change REF1085.2to133856 10 ft
feet 6.0-7.088.9 Cross Slope (PAR)SF1390.3to $120 $1,59614272510ft
feet 5.0-6.090.3 Cross Slope (PAR)SF5496.0to $120 $6,49814272610ft
feet .3492.6 Vertical Change REF1093.6to133857 10 ft
feet 3.0-4.096.0 Cross Slope (PAR)SF2198.2to $120 $2,50814272710ft
feet 3.0-4.0101.4 Cross Slope (PAR)SF10102.4to $120 $1,14014272810ft
feet 2.0-3.0102.7 Cross Slope (PAR)SF27105.5to $120 $3,19214272910ft
feet 3.0-4.0116.3 Cross Slope (PAR)SF16118.0to $120 $1,93814273010ft
feet 2.0-3.0118.0 Cross Slope (PAR)SF14119.5to $120 $1,71014273110ft
feet 2.0-3.0123.5 Cross Slope (PAR)SF91133.1to $120 $10,94414273210ft
feet .28132.8 Vertical Change REF10133.8to133858 10 ft
feet 4.0-5.0133.1 Cross Slope (PAR)SF163150.3to $120 $19,60814273310ft
feet -.28141.9 Vertical Change REF10142.9to133859 10 ft
feet 2.0-3.0151.0 Cross Slope (PAR)SF11152.2to $120 $1,36814273410ft
feet155.7 Driveway199.6to164700
feet -.32159.8 Vertical Change REF10160.8to133860 10 ft
feet 2.0-3.0205.9 Cross Slope (PAR)SF74213.7to $120 $8,89214273510ft
feet .27212.6 Vertical Change REF10213.6to133862 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
691
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
S ALAMEDA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221043
Run ID
E 25Th St
57.75
ID Sidewalk Width
Priority
feet 3.0-4.0215.8 Cross Slope (PAR)SF17217.6to $120 $2,05214273610ft
feet 2.0-3.0218.8 Cross Slope (PAR)SF54224.5to $120 $6,49814273710ft
feet 4.0-5.0224.5 Cross Slope (PAR)SF107235.8to $120 $12,88214273810ft
feet -.31233.6 Vertical Change REF10234.6to133863 10 ft
feet 2.0-3.0235.9 Cross Slope (PAR)SF38239.9to $120 $4,56014273910ft
feet 2.0-3.0264.3 Cross Slope (PAR)SF19266.3to $120 $2,28014274010ft
feet 2.0-3.0297.5 Cross Slope (PAR)SF37301.4to $120 $4,44614274110ft
feet 3.0-4.0324.2 Cross Slope (PAR)SF17326.0to $120 $2,05214274210ft
feet 2.0-3.0332.3 Cross Slope (PAR)SF29335.3to $120 $3,42014274310ft
feet 2.0-3.0339.2 Cross Slope (PAR)SF39343.3to $120 $4,67414274410ft
feet 4.0-5.0343.3 Cross Slope (PAR)SF147358.8to $120 $17,67014274510ft
feet 2.0-3.0359.7 Cross Slope (PAR)SF14361.2to $120 $1,71014274610ft
feet -.3360.5 Vertical Change REF10361.5to133864 10 ft
feet 2.0-3.0367.0 Cross Slope (PAR)SF121379.7to $120 $14,47814274710ft
feet 4.0-5.0379.7 Cross Slope (PAR)SF320413.4to $120 $38,41814274810ft
feet397.5 Continuous Width SF10398.5to $120 $1,14016703110ft
feet .34402.8 Vertical Change REF10403.8to133865 10 ft
feet 2.0-3.0413.4 Cross Slope (PAR)SF20415.5to $120 $2,39414274910ft
feet 7.0-8.0414.9 Running Slope REF22417.2to166425 10 ft
feet 5.0-6.0418.5 Running Slope SF10419.5to $120 $1,14016642610ft
feet420.8 Driveway466.8to164701
feet420.8 Driveway506.9to164702
feet 3.0-4.0467.4 Cross Slope (Driveway)SF270495.8to $40 $10,79214275010ft
feet .37467.9 Vertical Change REF10468.9to133866 10 ft
feet .35473.4 Vertical Change REF10474.4to133867 10 ft
feet -.32485.7 Vertical Change REF10486.7to133868 10 ft
feet .45492.5 Vertical Change REF10493.5to133869 10 ft
feet -.38496.8 Vertical Change REF10497.8to133870 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
692
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
S ALAMEDA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221043
Run ID
E 25Th St
57.75
ID Sidewalk Width
Priority
feet 2.0-3.0497.0 Cross Slope (Driveway)SF11498.2to $40 $45614275110ft
feet 5.0-6.0500.9 Running Slope REF14502.4to166427 10 ft
feet 6.0-7.0502.9 Running Slope REF13504.3to166428 10 ft
feet 8.0-9.0505.0 Running Slope REF10506.0to166429 10 ft
feet 6.0-7.0505.3 Cross Slope (Driveway)SF10506.3to $40 $38014275210ft
$284,800.50TOTAL COST FOR:E 25TH STSside of Starting at:S ALAMEDA ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
693
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221222
Run ID
E 25Th St
103.25
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF687.2to $120 $8,20814241110ft
feet 2.0-3.017.2 Cross Slope (PAR)SF1719.0to $120 $2,05214241210ft
feet .2722.2 Vertical Change LF1023.2to $75 $71313371110ft
feet 2.0-3.028.4 Cross Slope (PAR)SF2931.5to $120 $3,53414241310ft
feet 2.0-3.044.2 Cross Slope (PAR)SF7752.3to $120 $9,23414241410ft
feet 2.0-3.055.3 Cross Slope (PAR)SF5761.3to $120 $6,84014241510ft
feet 2.0-3.071.4 Cross Slope (PAR)SF6277.9to $120 $7,41014241610ft
feet 2.0-3.093.1 Cross Slope (PAR)SF6199.5to $120 $7,29614241710ft
feet101.0 Driveway160.1to164640
feet .35126.8 Vertical Change REF10127.8to133712 10 ft
feet161.8 Driveway183.0to164641
feet .28171.5 Vertical Change REF10172.5to133713 10 ft
feet 3.0-4.0183.0 Cross Slope (Driveway)SF11184.2to $40 $45614241810ft
feet 2.0-3.0184.2 Cross Slope (PAR)SF25186.8to $120 $2,96414241910ft
feet 2.0-3.0191.4 Cross Slope (PAR)SF284221.3to $120 $34,08614242010ft
feet 2.0-3.0229.7 Cross Slope (PAR)SF28232.6to $120 $3,30614242110ft
feet235.4 Driveway256.3to164642
feet 2.0-3.0268.3 Cross Slope (PAR)SF58274.4to $120 $6,95414242210ft
feet 2.0-3.0276.7 Cross Slope (PAR)SF32280.1to $120 $3,87614242310ft
feet280.1 Driveway296.7to164643
feet .36283.3 Vertical Change REF10284.3to133714 10 ft
feet -.72293.5 Vertical Change REF10294.5to133715 10 ft
feet 2.0-3.0297.3 Cross Slope (Driveway)SF60303.6to $40 $2,39414242410ft
feet 2.0-3.0309.4 Cross Slope (PAR)SF98319.7to $120 $11,74214242510ft
feet 4.0-5.0319.7 Cross Slope (PAR)SF148335.3to $120 $17,78414242610ft
feet 2.0-3.0335.3 Cross Slope (PAR)SF34338.9to $120 $4,10414242710ft
feet 2.0-3.0342.8 Cross Slope (PAR)SF62349.3to $120 $7,41014242810ft
feet 4.0-5.0349.3 Cross Slope (PAR)SF258376.5to $120 $31,00814242910ft
feet .52377.5 Vertical Change SF10378.5to $75 $71313371610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
694
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221222
Run ID
E 25Th St
103.25
ID Sidewalk Width
Priority
feet 2.0-3.0380.1 Cross Slope (PAR)SF10381.2to $120 $1,25414243010ft
feet 3.0-4.0385.2 Cross Slope (PAR)SF10386.3to $120 $1,25414243110ft
feet 5.0-6.0386.6 Cross Slope (PAR)SF12387.9to $120 $1,48214243210ft
feet 6.0-7.0387.9 Cross Slope (PAR)SF42392.3to $120 $5,01614243310ft
feet .27388.1 Vertical Change REF10389.1to133717 10 ft
feet 5.0-6.0393.2 Cross Slope (PAR)SF18395.1to $120 $2,16614243410ft
feet 5.0-6.0397.5 Cross Slope (PAR)SF25400.1to $120 $2,96414243510ft
feet 3.0-4.0403.3 Cross Slope (PAR)SF10404.3to $120 $1,14014243610ft
feet 2.0-3.0407.5 Cross Slope (PAR)SF62414.0to $120 $7,41014243710ft
feet .58409.8 Vertical Change REF10410.8to133718 10 ft
feet 4.0-5.0414.0 Cross Slope (PAR)SF42418.4to $120 $5,01614243810ft
feet418.4 Driveway496.3to164644
feet -.33467.9 Vertical Change REF10468.9to133719 10 ft
feet 2.24476.3 Vertical Change REF10477.3to133720 10 ft
feet .29491.3 Vertical Change REF10492.3to133721 10 ft
feet 2.0-3.0496.3 Cross Slope (Driveway)SF14497.8to $40 $57014243910ft
feet 2.0-3.0510.8 Cross Slope (PAR)SF101521.4to $120 $12,08414244010ft
feet .54524.7 Vertical Change REF10525.7to133722 10 ft
feet 3.0-4.0524.8 Cross Slope (PAR)SF187544.5to $120 $22,45814244110ft
feet 5.0-6.0545.6 Cross Slope (PAR)SF22547.9to $120 $2,62214244210ft
feet 3.0-4.0550.6 Cross Slope (PAR)SF55556.4to $120 $6,61214244310ft
feet 2.0-3.0556.9 Cross Slope (PAR)SF14558.4to $120 $1,71014244410ft
feet 4.0-5.0559.8 Cross Slope (PAR)SF82568.4to $120 $9,80414244510ft
feet 2.0-3.0568.4 Cross Slope (PAR)SF12569.7to $120 $1,48214244610ft
feet 2.0-3.0575.3 Cross Slope (PAR)SF66582.2to $120 $7,86614244710ft
feet588.9 Driveway616.8to164645
feet .34594.9 Vertical Change REF10595.9to133723 10 ft
feet 2.86603.4 Vertical Change REF10604.4to133724 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
695
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221222
Run ID
E 25Th St
103.25
ID Sidewalk Width
Priority
feet 2.0-3.0620.8 Cross Slope (PAR)SF131634.6to $120 $15,73214244810ft
feet .69633.6 Vertical Change REF10634.6to133725 10 ft
feet 3.0-4.0637.6 Cross Slope (PAR)SF37641.5to $120 $4,44614244910ft
feet 2.0-3.0641.5 Cross Slope (PAR)SF44646.1to $120 $5,24414245010ft
feet646.8 Driveway691.1to164646
feet .7655.2 Vertical Change REF9656.2to133726 10 ft
feet 2.47685.9 Vertical Change REF10686.9to133727 10 ft
feet 4.0-5.0691.1 Cross Slope (Driveway)SF29694.2to $40 $1,17814245110ft
feet 2.0-3.0694.2 Cross Slope (PAR)SF69701.5to $120 $8,32214245210ft
feet 5.0-6.0700.3 Running Slope REF10701.3to166423 10 ft
feet702.3 Driveway732.5to164647
feet .33719.7 Vertical Change REF10720.7to133728 10 ft
feet 3.0-4.0732.5 Cross Slope (Driveway)SF98742.8to $40 $3,91414245310ft
feet 2.0-3.0743.2 Cross Slope (PAR)SF19745.2to $120 $2,28014245410ft
feet 2.0-3.0756.5 Cross Slope (PAR)SF41760.8to $120 $4,90214245510ft
feet 2.0-3.0763.8 Cross Slope (PAR)SF166781.3to $120 $19,95014245610ft
feet 4.0-5.0782.0 Cross Slope (PAR)SF30785.2to $120 $3,64814245710ft
feet786.8 Driveway840.8to164648
feet 3.31817.2 Vertical Change REF10818.2to133730 10 ft
feet 2.76818.9 Vertical Change REF10819.9to133731 10 ft
feet842.1 Driveway857.1to164649
feet -.55850.6 Vertical Change REF10851.6to133732 10 ft
feet 3.0-4.0857.1 Cross Slope (Driveway)SF47862.0to $40 $1,86214245810ft
feet 1.04859.6 Vertical Change REF10860.6to133733 10 ft
feet 2.0-3.0862.0 Cross Slope (PAR)SF68869.2to $120 $8,20814245910ft
feet 4.0-5.0869.2 Cross Slope (PAR)SF380909.2to $120 $45,60014246010ft
feet .31878.3 Vertical Change REF10879.3to133734 10 ft
feet .44903.8 Vertical Change REF10904.8to133735 10 ft
feet 2.0-3.0918.0 Cross Slope (PAR)SF55923.8to $120 $6,61214246110ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
696
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221222
Run ID
E 25Th St
103.25
ID Sidewalk Width
Priority
feet925.3 Driveway957.5to164650
feet 6.0-7.0957.6 Cross Slope (Driveway)SF11958.8to $40 $45614246210ft
feet 4.0-5.0960.8 Cross Slope (PAR)SF114972.8to $120 $13,68014246310ft
feet 2.0-3.0972.8 Cross Slope (PAR)SF60979.1to $120 $7,18214246410ft
feet 4.0-5.0979.1 Cross Slope (PAR)SF34982.7to $120 $4,10414246510ft
feet 2.0-3.0983.0 Cross Slope (PAR)SF130996.7to $120 $15,61814246610ft
feet 4.0-5.0996.7 Cross Slope (PAR)SF1071008.0to $120 $12,88214246710ft
feet -.341009.0 Vertical Change LF101010.0to $75 $71313373610ft
feet 2.0-3.01016.8 Cross Slope (PAR)SF1761035.3to $120 $21,09014246810ft
feet 3.0-4.01037.4 Cross Slope (PAR)SF2131059.8to $120 $25,53614246910ft
feet1061.0 Driveway1106.3to164651
feet .471072.5 Vertical Change REF101073.5to133737 10 ft
feet .451092.6 Vertical Change REF101093.6to133738 10 ft
feet 14.0-15.01110.5 Cross Slope (PAR)SF811119.0to $120 $9,69014247010ft
feet .331111.6 Vertical Change REF101112.6to133740 10 ft
feet -.291118.5 Vertical Change REF101119.5to133741 10 ft
feet 5.0-6.01126.3 Cross Slope (PAR)SF601132.6to $120 $7,18214247110ft
feet 6.0-7.01132.8 Cross Slope (PAR)SF181134.7to $120 $2,16614247210ft
feet 8.0-9.01135.5 Cross Slope (PAR)SF451140.2to $120 $5,35814247310ft
feet 6.0-7.01141.4 Cross Slope (PAR)SF101142.5to $120 $1,25414247410ft
feet 2.0-3.01144.3 Cross Slope (PAR)SF141145.8to $120 $1,71014247510ft
feet1147.2 Driveway1149.3to164652
feet 4.0-5.01149.7 Cross Slope (PAR)SF1151161.8to $120 $13,79414247610ft
feet 1.191158.9 Vertical Change REF101159.9to133742 10 ft
feet 2.0-3.01161.8 Cross Slope (PAR)SF981172.1to $120 $11,74214247710ft
feet1172.5 Driveway1204.8to164653
feet -.331190.9 Vertical Change REF101191.9to133743 10 ft
feet 5.0-6.01204.8 Cross Slope (Driveway)SF481209.8to $40 $1,90014247810ft
feet 3.0-4.01212.0 Cross Slope (PAR)SF791220.3to $120 $9,46214247910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
697
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221222
Run ID
E 25Th St
103.25
ID Sidewalk Width
Priority
feet 3.0-4.01222.9 Cross Slope (PAR)SF271225.7to $120 $3,19214248010ft
feet 3.0-4.01227.8 Cross Slope (PAR)SF1531243.9to $120 $18,35414248110ft
feet 5.0-6.01245.4 Cross Slope (PAR)SF1221258.2to $120 $14,59214248210ft
feet -.831253.0 Vertical Change REF101254.0to133744 10 ft
feet1258.2 Driveway1282.2to164654
feet 6.0-7.01282.9 Cross Slope (PAR)SF131284.3to $120 $1,59614248310ft
feet 5.0-6.01284.8 Cross Slope (PAR)SF951294.8to $120 $11,40014248410ft
feet 3.0-4.01294.8 Cross Slope (PAR)SF361298.6to $120 $4,33214248510ft
feet .261296.9 Vertical Change REF101297.9to133745 10 ft
feet 2.0-3.01298.8 Cross Slope (PAR)SF1581315.4to $120 $18,92414248610ft
feet .311301.1 Vertical Change REF101302.1to133746 10 ft
feet .311317.7 Vertical Change LF101318.7to $75 $71313374710ft
feet 5.0-6.01319.4 Cross Slope (PAR)SF661326.3to $120 $7,86614248710ft
feet1326.3 Driveway1350.2to164655
feet 2.0-3.01351.2 Cross Slope (PAR)SF241353.7to $120 $2,85014248810ft
feet 4.0-5.01354.6 Cross Slope (PAR)SF1181367.0to $120 $14,13614248910ft
feet 3.0-4.01369.9 Cross Slope (PAR)SF141371.4to $120 $1,71014249010ft
feet 2.0-3.01371.4 Cross Slope (PAR)SF511376.8to $120 $6,15614249110ft
feet1376.8 Driveway1403.3to164656
feet 1.421386.1 Vertical Change REF101387.1to133748 10 ft
feet 2.0-3.01405.5 Cross Slope (PAR)SF141407.0to $120 $1,71014249210ft
feet 2.0-3.01409.3 Cross Slope (PAR)SF1441424.5to $120 $17,32814249310ft
feet .271415.1 Vertical Change REF101416.1to133749 10 ft
feet 4.0-5.01424.8 Cross Slope (PAR)SF641431.5to $120 $7,63814249410ft
feet 3.0-4.01433.9 Cross Slope (PAR)SF371437.8to $120 $4,44614249510ft
feet1437.8 Driveway1458.4to164657
feet .271438.1 Vertical Change REF101439.1to133750 10 ft
feet 2.0-3.01459.5 Cross Slope (PAR)SF691466.8to $120 $8,32214249610ft
feet 4.0-5.01467.1 Cross Slope (PAR)SF641473.8to $120 $7,63814249710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
698
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221222
Run ID
E 25Th St
103.25
ID Sidewalk Width
Priority
feet 2.0-3.01473.9 Cross Slope (PAR)SF561479.8to $120 $6,72614249810ft
feet 2.0-3.01483.5 Cross Slope (PAR)SF2351508.2to $120 $28,15814249910ft
feet 2.0-3.01511.5 Cross Slope (PAR)SF2551538.3to $120 $30,55214250010ft
feet 4.0-5.01541.3 Cross Slope (PAR)SF391545.4to $120 $4,67414250110ft
feet 2.0-3.01545.7 Cross Slope (PAR)SF1051556.7to $120 $12,54014250210ft
feet 4.0-5.01556.7 Cross Slope (PAR)SF1051567.7to $120 $12,54014250310ft
feet1567.7 Driveway1578.5to164658
feet 2.0-3.01579.4 Cross Slope (PAR)SF1881599.2to $120 $22,57214250410ft
feet 2.291594.6 Vertical Change REF101595.6to133752 10 ft
feet 10.0-11.01604.8 Cross Slope (PAR)SF1531620.9to $120 $18,35414250510ft
feet1620.9 Driveway1629.8to164659
feet 2.0-3.01633.8 Cross Slope (PAR)SF1451649.1to $120 $17,44214250610ft
feet 2.0-3.01653.3 Cross Slope (PAR)SF231655.7to $120 $2,73614250710ft
feet 2.0-3.01669.3 Cross Slope (PAR)SF1831688.6to $120 $22,00214250810ft
feet 4.0-5.01688.6 Cross Slope (PAR)SF491693.8to $120 $5,92814250910ft
feet1689.3 Continuous Width REF101690.3to166987 10 ft
feet 2.0-3.01693.8 Cross Slope (PAR)SF781702.0to $120 $9,34814251010ft
$908,884.00TOTAL COST FOR:E 25TH STNside of Starting at:S SANTA FE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
699
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S ALAMEDA ST
End Street Name
1911221232
Run ID
E 25Th St
54
ID Sidewalk Width
Priority
feet 2.0-3.01.1 Cross Slope (PAR)SF8710.3to $120 $10,48814237310ft
feet 4.0-5.010.3 Cross Slope (PAR)SF9420.2to $120 $11,28614237410ft
feet 2.0-3.020.2 Cross Slope (PAR)SF2823.1to $120 $3,30614237510ft
feet 4.0-5.024.3 Cross Slope (PAR)SF4228.7to $120 $5,01614237610ft
feet 4.0-5.031.8 Cross Slope (PAR)SF11844.2to $120 $14,13614237710ft
feet 2.0-3.045.3 Cross Slope (PAR)SF8854.6to $120 $10,60214237810ft
feet 2.0646.1 Vertical Change REF1047.1to133701 10 ft
feet 1.2153.8 Vertical Change REF1054.8to133702 10 ft
feet 2.0-3.057.1 Cross Slope (PAR)SF4261.5to $120 $5,01614237910ft
feet 2.0-3.065.3 Cross Slope (PAR)SF1466.8to $120 $1,71014238010ft
feet 2.0-3.075.0 Cross Slope (PAR)SF8984.4to $120 $10,71614238110ft
feet 3.486.7 Vertical Change SF1087.7to $75 $71313370310ft
feet 2.0-3.088.1 Cross Slope (PAR)SF155104.4to $120 $18,58214238210ft
feet 1.4994.9 Vertical Change REF1095.9to133704 10 ft
feet 4.0-5.0104.7 Cross Slope (PAR)SF62111.2to $120 $7,41014238310ft
feet 2.0-3.0111.3 Cross Slope (PAR)SF84120.1to $120 $10,03214238410ft
feet 4.0-5.0120.1 Cross Slope (PAR)SF37124.0to $120 $4,44614238510ft
feet 2.0-3.0124.0 Cross Slope (PAR)SF212146.3to $120 $25,42214238610ft
feet .36126.9 Vertical Change REF10127.9to133705 10 ft
feet 4.0-5.0147.3 Cross Slope (PAR)SF76155.3to $120 $9,12014238710ft
feet 1.01153.0 Vertical Change REF10154.0to133706 10 ft
feet 2.0-3.0156.2 Cross Slope (PAR)SF14157.7to $120 $1,71014238810ft
feet .39159.6 Vertical Change REF10160.6to133707 10 ft
feet 2.0-3.0160.4 Cross Slope (PAR)SF88169.7to $120 $10,60214238910ft
feet 2.0-3.0172.8 Cross Slope (PAR)SF390213.8to $120 $46,74014239010ft
feet 3.0-4.0217.3 Cross Slope (PAR)SF180236.2to $120 $21,54614239110ft
feet .36217.8 Vertical Change REF10218.8to133708 10 ft
feet236.2 Driveway256.1to164638
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
700
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 25TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S ALAMEDA ST
End Street Name
1911221232
Run ID
E 25Th St
54
ID Sidewalk Width
Priority
feet 4.0-5.0257.8 Cross Slope (PAR)SF112269.6to $120 $13,45214239210ft
feet261.3 Continuous Width REF10262.3to167793 10 ft
feet 2.0-3.0269.6 Cross Slope (PAR)SF86278.7to $120 $10,37414239310ft
feet 2.0-3.0286.8 Cross Slope (PAR)SF98297.1to $120 $11,74214239410ft
feet 2.0-3.0300.8 Cross Slope (PAR)SF326335.1to $120 $39,10214239510ft
feet 3.0-4.0337.3 Cross Slope (PAR)SF57343.3to $120 $6,84014239610ft
feet 2.0-3.0343.4 Cross Slope (PAR)SF15345.0to $120 $1,82414239710ft
feet 2.0-3.0347.8 Cross Slope (PAR)SF22350.1to $120 $2,62214239810ft
feet 4.0-5.0350.1 Cross Slope (PAR)SF47355.0to $120 $5,58614239910ft
feet 2.0-3.0356.8 Cross Slope (PAR)SF67363.8to $120 $7,98014240010ft
feet370.3 Continuous Width REF10371.3to167818 10 ft
feet 3.0-4.0371.3 Cross Slope (PAR)SF32374.7to $120 $3,87614240110ft
feet -.32372.9 Vertical Change REF10373.9to133709 10 ft
feet 2.0-3.0375.2 Cross Slope (PAR)SF185394.7to $120 $22,23014240210ft
feet 2.0-3.0401.5 Cross Slope (PAR)SF126414.8to $120 $15,16214240310ft
feet 1.09414.0 Vertical Change REF10415.0to133710 10 ft
feet415.9 Driveway456.6to164639
feet 3.0-4.0457.3 Cross Slope (Driveway)SF22459.6to $40 $87414240410ft
feet 2.0-3.0459.6 Cross Slope (PAR)SF429504.8to $120 $51,52814240510ft
feet479.6 Continuous Width REF10480.6to167811 10 ft
feet 2.0-3.0508.8 Cross Slope (PAR)SF98519.1to $120 $11,74214240610ft
feet 3.0-4.0521.7 Cross Slope (PAR)SF124534.8to $120 $14,93414240710ft
feet 2.0-3.0535.1 Cross Slope (PAR)SF188554.9to $120 $22,57214240810ft
feet 2.0-3.0558.2 Cross Slope (PAR)SF27561.0to $120 $3,19214240910ft
feet 4.0-5.0566.1 Cross Slope (PAR)SF37570.0to $120 $4,44614241010ft
$478,676.50TOTAL COST FOR:E 25TH STNside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
701
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
2120 E 25TH ST
End Street Name
1911221057
Run ID
E 25Th St
77
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF141.4to $120 $1,68014265910ft
feet 2.0-3.012.3 Cross Slope (PAR)SF6919.2to $120 $8,28014266010ft
feet -.4213.7 Vertical Change REF1014.7to133816 10 ft
feet19.3 Cold Patch 12331.6to140267 10 ft
feet 3.5520.4 Vertical Change SF1021.4to $75 $75013381710ft
feet .3527.2 Vertical Change LF1028.2to $75 $75013381810ft
feet 2.0-3.032.3 Cross Slope (PAR)SF3135.4to $120 $3,72014266110ft
feet35.4 Cold Patch 8644.0to140268 10 ft
feet 3.0-4.044.0 Cross Slope (PAR)SF6850.8to $120 $8,16014266210ft
feet .4847.1 Vertical Change REF1048.1to133819 10 ft
feet 2.0-3.050.8 Cross Slope (PAR)SF1452.2to $120 $1,68014266310ft
feet 5.0-6.054.6 Cross Slope (PAR)SF2056.6to $120 $2,40014266410ft
feet 2.0-3.058.2 Cross Slope (PAR)SF1659.8to $120 $1,92014266510ft
feet -.3562.4 Vertical Change REF1063.4to133820 10 ft
feet 2.0-3.062.8 Cross Slope (PAR)SF4967.7to $120 $5,88014266610ft
feet 2.0-3.070.7 Cross Slope (PAR)SF3974.6to $120 $4,68014266710ft
feet 2.0-3.077.1 Cross Slope (PAR)SF1178.2to $120 $1,32014266810ft
feet 4.0-5.079.4 Cross Slope (PAR)SF10790.1to $120 $12,84014266910ft
feet .4385.4 Vertical Change REF1086.4to133821 10 ft
feet 2.0-3.090.1 Cross Slope (PAR)SF3793.8to $120 $4,44014267010ft
feet 3.0-4.096.0 Cross Slope (PAR)SF59101.9to $120 $7,08014267110ft
feet .3897.6 Vertical Change REF1098.6to133822 10 ft
feet .47101.8 Vertical Change REF10102.8to133823 10 ft
feet 2.0-3.0101.9 Cross Slope (PAR)SF198121.7to $120 $23,76014267210ft
feet121.9 Driveway163.9to164689
feet -.26138.2 Vertical Change REF10139.2to133824 10 ft
feet -.39163.4 Vertical Change REF10164.4to133825 10 ft
feet 4.0-5.0165.7 Cross Slope (PAR)SF181183.8to $120 $21,72014267310ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
702
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
2120 E 25TH ST
End Street Name
1911221057
Run ID
E 25Th St
77
ID Sidewalk Width
Priority
feet -.3180.5 Vertical Change REF10181.5to133826 10 ft
feet 2.0-3.0183.8 Cross Slope (PAR)SF135197.3to $120 $16,20014267410ft
feet -.27191.2 Vertical Change REF10192.2to133827 10 ft
feet197.3 Driveway221.8to164690
feet .28197.8 Vertical Change REF10198.8to133828 10 ft
feet 4.0-5.0224.6 Cross Slope (PAR)SF37228.3to $120 $4,44014267510ft
feet -.27228.3 Vertical Change REF10229.3to133829 10 ft
feet 2.0-3.0229.3 Cross Slope (PAR)SF190248.3to $120 $22,80014267610ft
feet .35230.9 Vertical Change REF10231.9to133830 10 ft
feet 4.0-5.0248.6 Cross Slope (PAR)SF31251.7to $120 $3,72014267710ft
feet 2.18252.0 Vertical Change SF10253.0to $75 $75013383110ft
feet253.0 Driveway284.9to164691
feet -.26268.4 Vertical Change REF10269.4to133832 10 ft
feet 4.0-5.0285.2 Cross Slope (Driveway)SF23287.5to $40 $92014267810ft
feet .26285.8 Vertical Change REF10286.8to133833 10 ft
feet 2.0-3.0287.5 Cross Slope (PAR)SF118299.3to $120 $14,16014267910ft
feet .51299.8 Vertical Change SF10300.8to $75 $75013383410ft
feet -.54305.0 Vertical Change SF10306.0to $75 $75013383510ft
feet 3.0-4.0306.3 Cross Slope (PAR)SF10307.3to $120 $1,20014268010ft
feet 3.0-4.0310.2 Cross Slope (PAR)SF144324.6to $120 $17,28014268110ft
feet .76317.5 Vertical Change REF10318.5to133836 10 ft
feet 3.0-4.0327.0 Cross Slope (PAR)SF58332.8to $120 $6,96014268210ft
feet 5.0-6.0332.8 Cross Slope (PAR)SF77340.5to $120 $9,24014268310ft
feet340.7 Driveway369.7to164692
feet -.31355.7 Vertical Change REF10356.7to133837 10 ft
feet 4.0-5.0371.3 Cross Slope (PAR)SF15372.8to $120 $1,80014268410ft
feet 2.0-3.0377.4 Cross Slope (PAR)SF89386.3to $120 $10,68014268510ft
feet 4.0-5.0387.2 Cross Slope (PAR)SF74394.6to $120 $8,88014268610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
703
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
2120 E 25TH ST
End Street Name
1911221057
Run ID
E 25Th St
77
ID Sidewalk Width
Priority
feet 3.0-4.0396.8 Cross Slope (PAR)SF25399.3to $120 $3,00014268710ft
feet 2.0-3.0399.3 Cross Slope (PAR)SF35402.8to $120 $4,20014268810ft
feet 4.0-5.0403.6 Cross Slope (PAR)SF142417.8to $120 $17,04014268910ft
feet 4.0-5.0420.0 Cross Slope (PAR)SF12421.2to $120 $1,44014269010ft
feet .42421.0 Vertical Change REF10422.0to133838 10 ft
feet421.3 Driveway454.1to164693
feet .3429.7 Vertical Change REF10430.7to133839 10 ft
feet .36436.3 Vertical Change REF10437.3to133840 10 ft
feet 3.0-4.0455.8 Cross Slope (PAR)SF323488.1to $120 $38,76014269110ft
feet 2.0-3.0488.1 Cross Slope (PAR)SF54493.5to $120 $6,48014269210ft
feet 4.0-5.0493.8 Cross Slope (PAR)SF295523.3to $120 $35,40014269310ft
feet .36506.0 Vertical Change REF10507.0to133841 10 ft
feet523.3 Driveway556.4to164694
feet .39534.5 Vertical Change REF10535.5to133842 10 ft
feet -.27545.3 Vertical Change REF10546.3to133843 10 ft
feet 4.0-5.0557.2 Cross Slope (PAR)SF224579.6to $120 $26,88014269410ft
feet 4.0-5.0584.3 Cross Slope (PAR)SF58590.1to $120 $6,96014269510ft
feet 2.7586.7 Vertical Change REF10587.7to133844 10 ft
feet591.4 Driveway615.5to164695
feet .37594.0 Vertical Change REF10595.0to133845 10 ft
feet -.34600.5 Vertical Change REF10601.5to133846 10 ft
feet 3.0-4.0616.1 Cross Slope (Driveway)SF37619.8to $40 $1,48014269610ft
feet 4.0-5.0622.0 Cross Slope (PAR)SF79629.9to $120 $9,48014269710ft
feet 2.0-3.0629.9 Cross Slope (PAR)SF88638.7to $120 $10,56014269810ft
feet -.27635.2 Vertical Change REF10636.2to133847 10 ft
feet 4.0-5.0638.8 Cross Slope (PAR)SF65645.3to $120 $7,80014269910ft
feet 2.64641.0 Vertical Change REF10642.0to133848 10 ft
feet 2.0-3.0646.5 Cross Slope (PAR)SF52651.7to $120 $6,24014270010ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
704
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 25TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
2120 E 25TH ST
End Street Name
1911221057
Run ID
E 25Th St
77
ID Sidewalk Width
Priority
feet 4.0-5.0652.0 Cross Slope (PAR)SF51657.1to $120 $6,12014270110ft
feet657.6 Driveway681.7to164696
feet 2.0-3.0686.8 Cross Slope (PAR)SF126699.4to $120 $15,12014270210ft
feet699.9 Driveway742.8to164697
feet -.31713.2 Vertical Change REF10714.2to133849 10 ft
feet 5.0-6.0743.8 Cross Slope (PAR)SF18745.6to $120 $2,16014270310ft
feet 3.0-4.0748.8 Cross Slope (PAR)SF306779.4to $120 $36,72014270410ft
feet 2.0-3.0781.3 Cross Slope (PAR)SF45785.8to $120 $5,40014270510ft
feet 3.0-4.0788.3 Cross Slope (PAR)SF53793.6to $120 $6,36014270610ft
feet 2.0-3.0795.2 Cross Slope (PAR)SF21797.3to $120 $2,52014270710ft
feet 3.48799.1 Vertical Change SF10800.1to $75 $75013385010ft
feet 2.0-3.0801.3 Cross Slope (PAR)SF16802.9to $120 $1,92014270810ft
feet 3.0-4.0806.7 Cross Slope (PAR)SF56812.3to $120 $6,72014270910ft
feet 2.0-3.0812.3 Cross Slope (PAR)SF245836.8to $120 $29,40014271010ft
feet 3.0-4.0840.1 Cross Slope (PAR)SF124852.5to $120 $14,88014271110ft
feet 2.0-3.0852.5 Cross Slope (PAR)SF37856.2to $120 $4,44014271210ft
feet 4.0-5.0856.5 Cross Slope (PAR)SF107867.2to $120 $12,84014271310ft
feet 2.0-3.0869.7 Cross Slope (PAR)SF249894.6to $120 $29,88014271410ft
feet 4.0-5.0894.6 Cross Slope (PAR)SF61900.7to $120 $7,32014271510ft
feet 2.0-3.0900.7 Cross Slope (PAR)SF181918.8to $120 $21,72014271610ft
feet919.7 Driveway961.5to164698
feet 2.0-3.0961.5 Cross Slope (Driveway)SF21963.6to $40 $84014271710ft
feet 4.0-5.0965.8 Cross Slope (PAR)SF40969.8to $120 $4,80014271810ft
feet 2.0-3.0969.8 Cross Slope (PAR)SF64976.2to $120 $7,68014271910ft
feet976.3 Driveway1029.5to164699
$624,900.00TOTAL COST FOR:E 25TH STSside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
705
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
2640 E 26TH ST
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
1912041344
Run ID
E 26Th St
97.25
ID Sidewalk Width
Priority
feet1.1 Cold Patch 19640.4to140578 5 ft
feet 1541.4 Running Slope SF943.2to $120 $1,0801666445ft
feet44.7 Continuous Width REF545.7to167032 5 ft
feet .472.6 Vertical Change LF573.6to $75 $3751391235ft
feet -.2796.7 Vertical Change LF597.7to $75 $3751391245ft
feet -.28165.6 Vertical Change LF5166.6to $75 $3751391255ft
feet -.77182.8 Vertical Change SF5183.8to $75 $3751391265ft
feet 2.0-3.0236.1 Cross Slope (PAR)SF9237.8to $120 $1,0201612295ft
feet -.27251.7 Vertical Change LF5252.7to $75 $3751391275ft
feet 2.0-3.0291.3 Cross Slope (PAR)SF48300.8to $120 $5,7001612305ft
feet 2.0-3.0304.3 Cross Slope (PAR)SF95323.2to $120 $11,3401612315ft
feet 5.0-6.0304.3 Running Slope SF12306.6to $120 $1,3801666455ft
feet 6.0-7.0307.0 Running Slope SF68320.6to $120 $8,1601666465ft
feet321.1 Continuous Width REF5322.1to167033 5 ft
feet 2.0-3.0325.6 Cross Slope (PAR)SF8327.1to $120 $9001612325ft
feet 2.0-3.0329.2 Cross Slope (PAR)SF29334.9to $120 $3,4201612335ft
feet 2.0-3.0341.3 Cross Slope (PAR)SF14344.1to $120 $1,6801612345ft
feet 2.0-3.0347.9 Cross Slope (PAR)SF61360.1to $120 $7,3201612355ft
feet 3.0-4.0362.3 Cross Slope (PAR)SF49372.1to $120 $5,8801612365ft
feet 2.0-3.0372.3 Cross Slope (PAR)SF34379.1to $120 $4,0801612375ft
feet 4.0-5.0379.5 Cross Slope (PAR)SF229425.3to $120 $27,4801612385ft
feet 2.0-3.0425.3 Cross Slope (PAR)SF64438.0to $120 $7,6201612395ft
feet438.3 Driveway484.0to166192
feet .28462.7 Vertical Change REF5463.7to139128 5 ft
feet -.29471.3 Vertical Change REF5472.3to139129 5 ft
feet .33482.9 Vertical Change REF5483.9to139130 5 ft
feet 4.0-5.0485.0 Cross Slope (PAR)SF216528.3to $120 $25,9801612405ft
feet 2.0-3.0528.8 Cross Slope (PAR)SF20532.7to $120 $2,3401612415ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
706
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
2640 E 26TH ST
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
1912041344
Run ID
E 26Th St
97.25
ID Sidewalk Width
Priority
feet -.55530.4 Vertical Change REF14533.3to139131 5 ft
feet 4.0-5.0533.2 Cross Slope (PAR)SF38540.9to $120 $4,6201612425ft
feet542.4 Driveway615.3to166193
feet -.32544.3 Vertical Change REF5545.3to139132 5 ft
feet 5.0-6.0615.9 Cross Slope (PAR)SF8617.4to $120 $9001612435ft
feet 6.0-7.0617.4 Cross Slope (PAR)SF9619.2to $120 $1,0801612445ft
feet 5.0-6.0619.3 Cross Slope (PAR)SF43627.8to $120 $5,1001612455ft
feet628.6 Driveway662.6to166194
feet 4.0-5.0663.8 Cross Slope (PAR)SF49673.6to $120 $5,8801612465ft
feet 3.0-4.0676.0 Cross Slope (PAR)SF7677.3to $120 $7801612475ft
feet 2.0-3.0679.9 Cross Slope (PAR)SF7681.2to $120 $7801612485ft
feet 4.0-5.0682.7 Cross Slope (PAR)SF31688.9to $120 $3,7201612495ft
feet692.9 Driveway719.1to166195
feet .27696.6 Vertical Change REF5697.6to139133 5 ft
feet 5.0-6.0720.3 Cross Slope (PAR)SF13722.8to $120 $1,5001612505ft
feet 3.0-4.0725.4 Cross Slope (PAR)SF51735.6to $120 $6,1201612515ft
feet -.59727.9 Vertical Change REF5728.9to139134 5 ft
feet 5.0-6.0735.6 Cross Slope (PAR)SF5736.6to $120 $6001612525ft
feet 6.0-7.0736.6 Cross Slope (PAR)SF19740.3to $120 $2,2201612535ft
feet 4.0-5.0741.5 Cross Slope (PAR)SF37748.9to $120 $4,4401612545ft
feet 2.0-3.0748.9 Cross Slope (PAR)SF25753.8to $120 $2,9401612555ft
feet 4.0-5.0755.7 Cross Slope (PAR)SF73770.2to $120 $8,7001612565ft
feet 5.0-6.0773.1 Cross Slope (PAR)SF43781.7to $120 $5,1601612575ft
feet778.0 Continuous Width SF5779.0to $120 $6001669835ft
$172,395.00TOTAL COST FOR:E 26TH STSside of Starting at:2640 E 26TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
707
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
2677 E 26TH ST
Survey Street Name Starting Street Name
HARRIET ST
End Street Name
1912041614
Run ID
E 26Th St
49
ID Sidewalk Width
Priority
feet 2.0-3.017.8 Cross Slope (PAR)SF5022.8to $120 $6,00016059810ft
feet 2.0-3.028.3 Cross Slope (PAR)SF1029.3to $120 $1,20016059910ft
feet 2.0-3.036.1 Cross Slope (PAR)SF1938.0to $120 $2,28016060010ft
feet 2.0-3.059.8 Cross Slope (PAR)SF5365.1to $120 $6,36016060110ft
feet 2.0-3.087.0 Cross Slope (PAR)SF2189.1to $120 $2,52016060210ft
feet 2.0-3.096.7 Cross Slope (PAR)SF1097.7to $120 $1,20016060310ft
feet 2.0-3.0100.9 Cross Slope (PAR)SF10101.9to $120 $1,20016060410ft
feet 2.0-3.0117.3 Cross Slope (PAR)SF75124.8to $120 $9,00016060510ft
feet120.2 Continuous Width REF10121.2to167799 10 ft
feet124.8 Driveway164.3to166157
feet165.1 Cold Patch 168181.9to140573 10 ft
feet .29179.0 Vertical Change LF10180.0to $75 $75013897310ft
feet182.0 Driveway214.1to166158
feet 2.0-3.0225.0 Cross Slope (PAR)SF35228.5to $120 $4,20016060610ft
feet 2.0-3.0236.6 Cross Slope (PAR)SF54242.0to $120 $6,48016060710ft
feet 2.0-3.0251.4 Cross Slope (PAR)SF14252.8to $120 $1,68016060810ft
feet 2.0-3.0255.9 Cross Slope (PAR)SF79263.8to $120 $9,48016060910ft
feet 2.0-3.0271.8 Cross Slope (PAR)SF56277.4to $120 $6,72016061010ft
feet 2.0-3.0292.3 Cross Slope (PAR)SF82300.5to $120 $9,84016061110ft
feet 3.0-4.0305.5 Cross Slope (PAR)SF34308.9to $120 $4,08016061210ft
feet 2.0-3.0309.9 Cross Slope (PAR)SF14311.3to $120 $1,68016061310ft
feet 2.0-3.0313.5 Cross Slope (PAR)SF12314.7to $120 $1,44016061410ft
feet 2.0-3.0330.7 Cross Slope (PAR)SF39334.6to $120 $4,68016061510ft
feet 2.0-3.0385.3 Cross Slope (PAR)SF27388.0to $120 $3,24016061610ft
feet 2.0-3.0393.5 Cross Slope (PAR)SF33396.8to $120 $3,96016061710ft
feet -.78400.2 Vertical Change SF10401.2to $75 $75013897410ft
feet 2.0-3.0407.4 Cross Slope (PAR)SF14408.8to $120 $1,68016061810ft
feet 2.0-3.0411.2 Cross Slope (PAR)SF26413.8to $120 $3,12016061910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
708
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
2677 E 26TH ST
Survey Street Name Starting Street Name
HARRIET ST
End Street Name
1912041614
Run ID
E 26Th St
49
ID Sidewalk Width
Priority
feet 2.0-3.0420.3 Cross Slope (PAR)SF35423.8to $120 $4,20016062010ft
feet 2.0-3.0430.4 Cross Slope (PAR)SF23432.7to $120 $2,76016062110ft
feet432.7 Driveway458.9to166159
feet 3.0-4.0459.3 Cross Slope (Driveway)SF48464.1to $40 $1,92016062210ft
feet 3.0-4.0466.3 Cross Slope (PAR)SF103476.6to $120 $12,36016062310ft
feet 2.0-3.0477.8 Cross Slope (PAR)SF20479.8to $120 $2,40016062410ft
feet .27482.8 Vertical Change LF10483.8to $75 $75013897510ft
feet 2.0-3.0486.8 Cross Slope (PAR)SF10487.8to $120 $1,20016062510ft
feet 2.0-3.0495.3 Cross Slope (PAR)SF35498.8to $120 $4,20016062610ft
feet 2.0-3.0501.0 Cross Slope (PAR)SF136514.6to $120 $16,32016062710ft
feet 3.0-4.0520.1 Cross Slope (PAR)SF61526.2to $120 $7,32016062810ft
feet 2.0-3.0532.5 Cross Slope (PAR)SF140546.5to $120 $16,80016062910ft
feet 4.0-5.0546.5 Cross Slope (PAR)SF91555.6to $120 $10,92016063010ft
feet 2.0-3.0555.6 Cross Slope (PAR)SF119567.5to $120 $14,28016063110ft
feet 2.0-3.0572.1 Cross Slope (PAR)SF29575.0to $120 $3,48016063210ft
feet .28573.3 Vertical Change REF10574.3to138976 10 ft
feet 2.0-3.0581.0 Cross Slope (PAR)SF235604.5to $120 $28,20016063310ft
feet 2.0-3.0606.8 Cross Slope (PAR)SF26609.4to $120 $3,12016063410ft
feet 2.0-3.0613.4 Cross Slope (PAR)SF75620.9to $120 $9,00016063510ft
feet 2.0-3.0627.8 Cross Slope (PAR)SF222650.0to $120 $26,64016063610ft
feet -.4629.3 Vertical Change REF10630.3to138977 10 ft
feet 2.0-3.0654.7 Cross Slope (PAR)SF64661.1to $120 $7,68016063710ft
$267,090.00TOTAL COST FOR:E 26TH STNside of Starting at:2677 E 26TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
709
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
3770 E 26TH ST
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161545
Run ID
E 26Th St
35.75
ID Sidewalk Width
Priority
feet 2.0-3.02.3 Cross Slope (PAR)SF438.0to $120 $5,1301563278ft
feet 2.0-3.010.3 Cross Slope (PAR)SF1312.0to $120 $1,5301563288ft
feet 2.0-3.014.1 Cross Slope (PAR)SF1215.7to $120 $1,4401563298ft
feet 2.0-3.019.9 Cross Slope (PAR)SF3424.4to $120 $4,0501563308ft
feet 2.0-3.028.2 Cross Slope (PAR)SF5735.8to $120 $6,8401563318ft
feet 4.0-5.037.9 Cross Slope (PAR)SF19664.1to $120 $23,5801563328ft
feet 2.0-3.065.3 Cross Slope (PAR)SF8076.0to $120 $9,6301563338ft
feet 3.0-4.078.6 Cross Slope (PAR)SF1180.1to $120 $1,3501563348ft
feet80.1 Driveway109.8to165864
feet 4.0-5.0111.8 Cross Slope (PAR)SF84123.0to $120 $10,0801563358ft
feet123.0 Driveway150.4to165865
feet 3.0-4.0150.7 Cross Slope (PAR)SF8151.7to $120 $9001563368ft
feet 2.0-3.0151.8 Cross Slope (PAR)SF86163.3to $120 $10,3501563378ft
feet 2.0-3.0165.8 Cross Slope (PAR)SF12167.4to $120 $1,4401563388ft
feet 2.0-3.0172.5 Cross Slope (PAR)SF29176.3to $120 $3,4201563398ft
feet 4.0-5.0177.3 Cross Slope (PAR)SF11178.8to $120 $1,3501563408ft
feet 2.0-3.0179.9 Cross Slope (PAR)SF18182.3to $120 $2,1601563418ft
feet 4.0-5.0184.6 Cross Slope (PAR)SF30188.6to $120 $3,6001563428ft
feet 3.0-4.0193.2 Cross Slope (PAR)SF12194.8to $120 $1,4401563438ft
feet 2.0-3.0194.8 Cross Slope (PAR)SF9196.0to $120 $1,0801563448ft
feet 4.0-5.0201.3 Cross Slope (PAR)SF8202.4to $120 $9901563458ft
feet 3.0-4.0204.9 Cross Slope (PAR)SF269240.8to $120 $32,3101563468ft
feet 3.59221.1 Vertical Change REF8222.1to137854 8 ft
feet 2.0-3.0243.5 Cross Slope (PAR)SF17245.8to $120 $2,0701563478ft
feet 4.0-5.0246.4 Cross Slope (PAR)SF77256.7to $120 $9,2701563488ft
feet 2.0-3.0256.7 Cross Slope (PAR)SF24259.9to $120 $2,8801563498ft
feet 3.0-4.0262.5 Cross Slope (PAR)SF77272.8to $120 $9,2701563508ft
feet 2.0-3.0272.8 Cross Slope (PAR)SF184297.4to $120 $22,1401563518ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
710
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
3770 E 26TH ST
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161545
Run ID
E 26Th St
35.75
ID Sidewalk Width
Priority
feet 2.0-3.0299.9 Cross Slope (PAR)SF128317.0to $120 $15,3901563528ft
feet 4.0-5.0317.5 Cross Slope (PAR)SF82328.4to $120 $9,8101563538ft
feet 2.0-3.0328.7 Cross Slope (PAR)SF12330.3to $120 $1,4401563548ft
feet 2.0-3.0340.9 Cross Slope (PAR)SF509408.8to $120 $61,1101563558ft
feet 2.0-3.0418.8 Cross Slope (PAR)SF11420.3to $120 $1,3501563568ft
feet 2.0-3.0428.7 Cross Slope (PAR)SF74438.6to $120 $8,9101563578ft
feet 2.0-3.0446.1 Cross Slope (PAR)SF122462.4to $120 $14,6701563588ft
feet .59463.2 Vertical Change SF8464.2to $75 $5631378558ft
feet 3.0-4.0473.8 Cross Slope (PAR)SF56481.3to $120 $6,7501563598ft
feet 2.0-3.0485.8 Cross Slope (PAR)SF11487.3to $120 $1,3501563608ft
feet 3.0-4.0491.3 Cross Slope (PAR)SF24494.5to $120 $2,8801563618ft
feet 2.0-3.0497.1 Cross Slope (PAR)SF20499.8to $120 $2,4301563628ft
feet 2.0-3.0502.6 Cross Slope (PAR)SF25505.9to $120 $2,9701563638ft
feet505.9 Driveway561.4to165866
feet 2.0-3.0571.5 Cross Slope (PAR)SF54578.7to $120 $6,4801563648ft
feet 5.0-6.0576.4 Running Slope REF10577.7to166553 8 ft
feet581.3 Driveway628.7to165867
feet 2.0-3.0635.1 Cross Slope (PAR)SF9636.3to $120 $1,0801563658ft
feet 2.0-3.0645.3 Cross Slope (PAR)SF44651.2to $120 $5,3101563668ft
feet 2.0-3.0656.3 Cross Slope (PAR)SF38661.3to $120 $4,5001563678ft
feet 2.0-3.0664.8 Cross Slope (PAR)SF11666.2to $120 $1,2601563688ft
feet 2.0-3.0670.1 Cross Slope (PAR)SF10671.4to $120 $1,1701563698ft
feet 2.0-3.0686.3 Cross Slope (PAR)SF43692.0to $120 $5,1301563708ft
feet 3.0-4.0694.9 Cross Slope (PAR)SF15696.9to $120 $1,8001563718ft
feet 5.0-6.0697.4 Cross Slope (PAR)SF8698.4to $120 $9001563728ft
feet 6.0-7.0699.7 Cross Slope (PAR)SF11701.1to $120 $1,2601563738ft
feet 3.0-4.0706.8 Cross Slope (PAR)SF51713.6to $120 $6,1201563748ft
feet 2.0-3.0717.8 Cross Slope (PAR)SF29721.6to $120 $3,4201563758ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
711
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
3770 E 26TH ST
Survey Street Name Starting Street Name
S INDIANA ST
End Street Name
2001161545
Run ID
E 26Th St
35.75
ID Sidewalk Width
Priority
feet 2.0-3.0748.6 Cross Slope (PAR)SF347794.9to $120 $41,6701563768ft
feet 2.0-3.0800.4 Cross Slope (PAR)SF31804.5to $120 $3,6901563778ft
feet 2.0-3.0807.0 Cross Slope (PAR)SF105821.0to $120 $12,6001563788ft
feet 3.0-4.0826.8 Cross Slope (PAR)SF11828.3to $120 $1,3501563798ft
feet 3.0-4.0831.5 Cross Slope (PAR)SF134849.3to $120 $16,0201563808ft
feet 2.0-3.0850.7 Cross Slope (PAR)SF34855.2to $120 $4,0501563818ft
feet 3.0-4.0857.6 Cross Slope (PAR)SF38862.6to $120 $4,5001563828ft
feet 2.0-3.0862.8 Cross Slope (PAR)SF44868.7to $120 $5,3101563838ft
feet 3.0-4.0875.2 Cross Slope (PAR)SF76885.3to $120 $9,0901563848ft
feet 2.0-3.0885.8 Cross Slope (PAR)SF143904.8to $120 $17,1001563858ft
feet 2.0-3.0907.5 Cross Slope (PAR)SF70916.8to $120 $8,3701563868ft
feet 3.0-4.0920.4 Cross Slope (PAR)SF89932.3to $120 $10,7101563878ft
feet 2.0-3.0932.7 Cross Slope (PAR)SF114947.9to $120 $13,6801563888ft
feet 4.0-5.0947.9 Cross Slope (PAR)SF24951.1to $120 $2,8801563898ft
feet -.28949.1 Vertical Change REF8950.1to137856 8 ft
feet 2.0-3.0954.1 Cross Slope (PAR)SF28957.8to $120 $3,3301563908ft
feet 5.0-6.0956.7 Running Slope REF18959.1to166554 8 ft
$490,702.50TOTAL COST FOR:E 26TH STSside of Starting at:3770 E 26TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
712
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
4366 E 26TH ST
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001160953
Run ID
E 26Th St
73.25
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF314.6to $120 $3,7261578047ft
feet 4.0-5.05.8 Cross Slope (PAR)SF3010.3to $120 $3,6451578057ft
feet 2.0-3.010.3 Cross Slope (PAR)SF911.7to $120 $1,1341578067ft
feet 3.0-4.014.7 Cross Slope (PAR)SF1416.8to $120 $1,7011578077ft
feet 2.0-3.016.8 Cross Slope (PAR)SF11834.3to $120 $14,1751578087ft
feet 2.0-3.036.9 Cross Slope (PAR)SF8048.8to $120 $9,6391578097ft
feet 4.0-5.050.6 Cross Slope (PAR)SF2053.6to $120 $2,4301578107ft
feet 4.0-5.055.9 Cross Slope (PAR)SF3661.3to $120 $4,3741578117ft
feet 2.0-3.067.9 Cross Slope (PAR)SF7278.6to $120 $8,6671578127ft
feet 2.0-3.082.7 Cross Slope (PAR)SF4489.2to $120 $5,2651578137ft
feet -.2782.8 Vertical Change REF783.8to138096 7 ft
feet89.2 Driveway115.9to165925
feet .3102.0 Vertical Change REF7103.0to138097 7 ft
feet 3.0-4.0118.3 Cross Slope (PAR)SF51125.8to $120 $6,0751578147ft
feet 2.0-3.0127.7 Cross Slope (PAR)SF106143.4to $120 $12,7171578157ft
feet 2.0-3.0147.8 Cross Slope (PAR)SF58156.4to $120 $6,9661578167ft
feet 3.0-4.0160.3 Cross Slope (PAR)SF22163.5to $120 $2,5921578177ft
feet 2.0-3.0163.5 Cross Slope (PAR)SF12165.3to $120 $1,4581578187ft
feet 2.0-3.0167.4 Cross Slope (PAR)SF33172.3to $120 $3,9691578197ft
feet .29173.1 Vertical Change LF7174.1to $75 $5061380987ft
feet 3.0-4.0175.0 Cross Slope (PAR)SF8176.2to $120 $9721578207ft
feet .41180.1 Vertical Change REF7181.1to138099 7 ft
feet 3.0-4.0180.6 Cross Slope (PAR)SF15182.8to $120 $1,7821578217ft
feet 2.0-3.0194.8 Cross Slope (PAR)SF61203.8to $120 $7,2901578227ft
feet 2.0-3.0213.2 Cross Slope (PAR)SF22216.5to $120 $2,6731578237ft
feet 3.0-4.0219.0 Cross Slope (PAR)SF39224.8to $120 $4,6981578247ft
feet 2.0-3.0224.8 Cross Slope (PAR)SF197254.0to $120 $23,6521578257ft
feet .32261.5 Vertical Change LF7262.5to $75 $5061381017ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
713
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
4366 E 26TH ST
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001160953
Run ID
E 26Th St
73.25
ID Sidewalk Width
Priority
feet264.2 Cold Patch 24267.8to140558 7 ft
feet 7.0-8.0270.6 Cross Slope (PAR)SF12272.4to $120 $1,4581578267ft
feet .29274.4 Vertical Change LF7275.4to $75 $5061381027ft
feet 2.0-3.0276.0 Cross Slope (PAR)SF10277.5to $120 $1,2151578277ft
feet 2.0-3.0280.4 Cross Slope (PAR)SF13282.3to $120 $1,5391578287ft
feet 3.0-4.0284.5 Cross Slope (PAR)SF16286.8to $120 $1,8631578297ft
feet 3.0-4.0288.9 Cross Slope (PAR)SF30293.3to $120 $3,5641578307ft
feet 2.0-3.0293.3 Cross Slope (PAR)SF30297.7to $120 $3,5641578317ft
feet 2.0-3.0300.4 Cross Slope (PAR)SF133320.1to $120 $15,9571578327ft
feet 3.0-4.0325.3 Cross Slope (PAR)SF10326.8to $120 $1,2151578337ft
feet 2.0-3.0326.8 Cross Slope (PAR)SF43333.1to $120 $5,1031578347ft
feet 4.0-5.0337.6 Cross Slope (PAR)SF8338.8to $120 $9721578357ft
feet 2.0-3.0339.3 Cross Slope (PAR)SF7340.3to $120 $8101578367ft
feet 2.0-3.0343.7 Cross Slope (PAR)SF7344.7to $120 $8101578377ft
feet 2.0-3.0346.8 Cross Slope (PAR)SF60355.7to $120 $7,2091578387ft
feet 1.95354.6 Vertical Change REF7355.6to138103 7 ft
feet 5.0-6.0363.7 Cross Slope (PAR)SF7364.8to $120 $8911578397ft
feet 6.0-7.0365.1 Cross Slope (PAR)SF44371.6to $120 $5,2651578407ft
feet371.6 Driveway421.2to165926
feet 4.0-5.0423.4 Cross Slope (PAR)SF9424.8to $120 $1,1341578417ft
feet 3.0-4.0427.0 Cross Slope (PAR)SF39432.8to $120 $4,6981578427ft
feet 3.0-4.0435.1 Cross Slope (PAR)SF14437.1to $120 $1,6201578437ft
feet 3.0-4.0443.8 Cross Slope (PAR)SF10445.3to $120 $1,2151578447ft
feet 2.0-3.0445.8 Cross Slope (PAR)SF28449.9to $120 $3,3211578457ft
feet 4.0-5.0449.9 Cross Slope (PAR)SF14451.9to $120 $1,6201578467ft
feet 2.0-3.0455.0 Cross Slope (PAR)SF7456.0to $120 $8101578477ft
feet468.3 Driveway495.3to165927
feet 2.0-3.0495.5 Cross Slope (PAR)SF49502.8to $120 $5,9131578487ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
714
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
4366 E 26TH ST
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001160953
Run ID
E 26Th St
73.25
ID Sidewalk Width
Priority
feet 2.0-3.0506.6 Cross Slope (PAR)SF8507.8to $120 $9721578497ft
feet 2.0-3.0518.6 Cross Slope (PAR)SF35523.8to $120 $4,2121578507ft
feet526.3 Driveway555.9to165928
feet .26542.2 Vertical Change REF7543.2to138104 7 ft
feet 3.0-4.0556.7 Cross Slope (PAR)SF9558.0to $120 $1,0531578517ft
feet 2.0-3.0559.1 Cross Slope (PAR)SF86571.8to $120 $10,2871578527ft
feet 5.0-6.0568.8 Running Slope REF11570.4to166613 7 ft
feet572.8 Driveway589.8to165929
feet .42578.4 Vertical Change REF7579.4to138105 7 ft
feet 2.0-3.0590.3 Cross Slope (Driveway)SF8591.5to $40 $3241578537ft
feet 3.0-4.0600.8 Cross Slope (PAR)SF17603.3to $120 $2,0251578547ft
feet 3.0-4.0607.9 Cross Slope (PAR)SF38613.6to $120 $4,6171578557ft
feet 2.0-3.0619.1 Cross Slope (PAR)SF45625.7to $120 $5,3461578567ft
feet625.8 Driveway668.3to165930
feet 2.0-3.0673.3 Cross Slope (PAR)SF19676.1to $120 $2,2681578577ft
feet 4.0-5.0676.1 Cross Slope (PAR)SF34681.2to $120 $4,1311578587ft
feet 3.0-4.0683.7 Cross Slope (PAR)SF45690.4to $120 $5,4271578597ft
feet 2.0-3.0691.0 Cross Slope (PAR)SF49698.3to $120 $5,9131578607ft
feet -.29694.5 Vertical Change REF7695.5to138106 7 ft
feet 2.0-3.0704.3 Cross Slope (PAR)SF84716.7to $120 $10,0441578617ft
feet 4.0-5.0716.7 Cross Slope (PAR)SF26720.6to $120 $3,1591578627ft
feet 2.0-3.0720.6 Cross Slope (PAR)SF12722.4to $120 $1,4581578637ft
feet 2.0-3.0725.1 Cross Slope (PAR)SF35730.3to $120 $4,2121578647ft
feet .26728.5 Vertical Change REF7729.5to138107 7 ft
feet 4.0-5.0730.4 Cross Slope (PAR)SF57738.8to $120 $6,8041578657ft
feet 2.0-3.0745.5 Cross Slope (PAR)SF51753.0to $120 $6,0751578667ft
feet 2.0-3.0755.7 Cross Slope (PAR)SF32760.5to $120 $3,8881578677ft
feet -.31758.6 Vertical Change REF7759.6to138108 7 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
715
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
4366 E 26TH ST
Survey Street Name Starting Street Name
AYERS AVE
End Street Name
2001160953
Run ID
E 26Th St
73.25
ID Sidewalk Width
Priority
feet 2.0-3.0763.4 Cross Slope (PAR)SF182790.4to $120 $21,8701578687ft
feet776.1 Continuous Width REF7777.1to167761 7 ft
feet 3.0-4.0794.1 Cross Slope (PAR)SF49801.3to $120 $5,8321578697ft
feet .33799.6 Vertical Change REF7800.6to138109 7 ft
feet 2.0-3.0802.0 Cross Slope (PAR)SF24805.6to $120 $2,9161578707ft
feet -.26806.6 Vertical Change REF7807.6to138110 7 ft
feet 4.0-5.0807.2 Cross Slope (PAR)SF118824.7to $120 $14,1751578717ft
feet -.27814.1 Vertical Change REF7815.1to138111 7 ft
feet815.9 Continuous Width SF7816.9to $120 $8101668167ft
feet .39817.3 Vertical Change REF7818.3to138112 7 ft
feet 7.0-8.0827.3 Cross Slope (PAR)SF12829.1to $120 $1,4581578727ft
feet 5.0-6.0832.8 Cross Slope (PAR)SF10834.3to $120 $1,2151578737ft
feet 3.0-4.0835.0 Cross Slope (PAR)SF10836.5to $120 $1,2151578747ft
feet 2.0-3.0836.5 Cross Slope (PAR)SF11838.1to $120 $1,2961578757ft
$335,886.75TOTAL COST FOR:E 26TH STSside of Starting at:4366 E 26TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
716
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
AYERS AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001161030
Run ID
E 26Th St
115
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF101.3to $120 $1,1701575658ft
feet 5.0-6.04.4 Cross Slope (PAR)SF197.0to $120 $2,3401575668ft
feet 6.0-7.07.0 Cross Slope (PAR)SF88.1to $120 $9901575678ft
feet 6.0-7.011.3 Cross Slope (PAR)SF812.3to $120 $9001575688ft
feet 5.0-6.014.3 Cross Slope (PAR)SF1616.4to $120 $1,8901575698ft
feet 3.0-4.016.9 Cross Slope (PAR)SF1418.8to $120 $1,7101575708ft
feet 5.0-6.020.8 Cross Slope (PAR)SF1422.7to $120 $1,7101575718ft
feet 2.0-3.025.6 Cross Slope (PAR)SF4431.5to $120 $5,3101575728ft
feet 2.0-3.034.3 Cross Slope (PAR)SF935.5to $120 $1,0801575738ft
feet 3.0-4.045.1 Cross Slope (PAR)SF1046.4to $120 $1,1701575748ft
feet 2.0-3.046.4 Cross Slope (PAR)SF1047.7to $120 $1,1701575758ft
feet 3.0-4.052.9 Cross Slope (PAR)SF2956.7to $120 $3,4201575768ft
feet 2.0-3.071.0 Cross Slope (PAR)SF6679.8to $120 $7,9201575778ft
feet 3.0-4.083.8 Cross Slope (PAR)SF884.8to $120 $9001575788ft
feet 5.0-6.085.5 Cross Slope (PAR)SF2488.7to $120 $2,8801575798ft
feet 2.0-3.089.4 Cross Slope (PAR)SF890.4to $120 $9001575808ft
feet .3198.5 Vertical Change LF899.5to $75 $5631380338ft
feet 2.0-3.0101.1 Cross Slope (PAR)SF52108.0to $120 $6,2101575818ft
feet 6.0-7.0110.8 Cross Slope (PAR)SF8111.9to $120 $9901575828ft
feet 2.0-3.0115.7 Cross Slope (PAR)SF48122.1to $120 $5,7601575838ft
feet .43127.1 Vertical Change LF8128.1to $75 $5631380348ft
feet 2.0-3.0129.7 Cross Slope (PAR)SF12131.3to $120 $1,4401575848ft
feet 2.0-3.0135.8 Cross Slope (PAR)SF54143.0to $120 $6,4801575858ft
feet 2.0-3.0146.3 Cross Slope (PAR)SF28150.0to $120 $3,3301575868ft
feet 2.22149.5 Vertical Change REF8150.5to138035 8 ft
feet149.8 Continuous Width REF8150.8to167837 8 ft
feet 4.0-5.0152.7 Cross Slope (PAR)SF22155.6to $120 $2,6101575878ft
feet 2.0-3.0155.6 Cross Slope (PAR)SF8156.7to $120 $9901575888ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
717
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
AYERS AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001161030
Run ID
E 26Th St
115
ID Sidewalk Width
Priority
feet 3.0-4.0159.8 Cross Slope (PAR)SF20162.5to $120 $2,4301575898ft
feet 2.0-3.0162.7 Cross Slope (PAR)SF54169.9to $120 $6,4801575908ft
feet .37164.1 Vertical Change REF8165.1to138036 8 ft
feet 2.0-3.0173.0 Cross Slope (PAR)SF44178.9to $120 $5,3101575918ft
feet 4.0-5.0178.9 Cross Slope (PAR)SF92191.1to $120 $10,9801575928ft
feet .7181.8 Vertical Change REF8182.8to138037 8 ft
feet 2.0-3.0192.9 Cross Slope (PAR)SF11194.4to $120 $1,3501575938ft
feet 2.0-3.0196.6 Cross Slope (PAR)SF58204.3to $120 $6,9301575948ft
feet 2.0-3.0210.3 Cross Slope (PAR)SF12211.9to $120 $1,4401575958ft
feet 5.0-6.0215.0 Cross Slope (PAR)SF26218.5to $120 $3,1501575968ft
feet 2.0-3.0218.9 Cross Slope (PAR)SF11220.3to $120 $1,2601575978ft
feet .26220.5 Vertical Change LF8221.5to $75 $5631380388ft
feet225.3 Continuous Width SF8226.3to $120 $9001672998ft
feet .4226.1 Vertical Change LF8227.1to $75 $5631380398ft
feet .5229.9 Vertical Change REF22232.8to138040 8 ft
feet 2.0-3.0230.3 Cross Slope (PAR)SF17232.6to $120 $2,0701575988ft
feet -.53235.3 Vertical Change SF24238.5to $75 $1,8001380418ft
feet 2.0-3.0237.1 Cross Slope (PAR)SF216265.9to $120 $25,9201575998ft
feet -.3243.9 Vertical Change REF8244.9to138042 8 ft
feet .56252.8 Vertical Change REF8253.8to138043 8 ft
feet .29255.9 Vertical Change REF7256.9to138044 8 ft
feet .43264.3 Vertical Change REF8265.3to138045 8 ft
feet 4.0-5.0265.9 Cross Slope (PAR)SF28269.6to $120 $3,3301576008ft
feet 2.0-3.0272.1 Cross Slope (PAR)SF25275.4to $120 $2,9701576018ft
feet 3.0-4.0279.7 Cross Slope (PAR)SF29283.6to $120 $3,5101576028ft
feet 2.0-3.0284.4 Cross Slope (PAR)SF62292.7to $120 $7,4701576038ft
feet 3.22292.9 Vertical Change REF8293.9to138046 8 ft
feet 4.0-5.0293.4 Cross Slope (PAR)SF80304.1to $120 $9,6301576048ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
718
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
AYERS AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001161030
Run ID
E 26Th St
115
ID Sidewalk Width
Priority
feet .47303.9 Vertical Change REF8304.9to138047 8 ft
feet .5308.1 Vertical Change SF27311.7to $75 $2,0251380488ft
feet 2.0-3.0309.8 Cross Slope (PAR)SF8310.8to $120 $9001576058ft
feet .28314.1 Vertical Change LF8315.1to $75 $5631380498ft
feet .9315.7 Vertical Change SF8316.7to $75 $5631380508ft
feet 3.0-4.0317.8 Cross Slope (PAR)SF58325.5to $120 $6,9301576068ft
feet .32320.7 Vertical Change REF8321.7to138051 8 ft
feet .79323.2 Vertical Change REF8324.2to138052 8 ft
feet 2.0-3.0326.3 Cross Slope (PAR)SF128343.3to $120 $15,3001576078ft
feet 2.0-3.0345.5 Cross Slope (PAR)SF49352.0to $120 $5,8501576088ft
feet .8353.9 Vertical Change REF8354.9to138053 8 ft
feet 3.0-4.0354.4 Cross Slope (PAR)SF47360.6to $120 $5,5801576098ft
feet .33359.3 Vertical Change REF8360.3to138054 8 ft
feet 2.0-3.0360.6 Cross Slope (PAR)SF10361.9to $120 $1,1701576108ft
feet 2.0-3.0364.8 Cross Slope (PAR)SF62373.0to $120 $7,3801576118ft
feet 4.0-5.0374.2 Cross Slope (PAR)SF20376.9to $120 $2,4301576128ft
feet .46374.7 Vertical Change REF8375.7to138055 8 ft
feet 2.0-3.0378.5 Cross Slope (PAR)SF35383.2to $120 $4,2301576138ft
feet .52379.6 Vertical Change REF8380.6to138056 8 ft
feet 2.0-3.0386.1 Cross Slope (PAR)SF10387.4to $120 $1,1701576148ft
feet 2.0-3.0390.4 Cross Slope (PAR)SF39395.6to $120 $4,6801576158ft
feet394.9 Continuous Width SF8395.9to $120 $9001673008ft
feet -.4395.4 Vertical Change REF8396.4to138057 8 ft
feet .26397.9 Vertical Change LF8398.9to $75 $5631380588ft
feet 4.0-5.0400.8 Cross Slope (PAR)SF60408.8to $120 $7,2001576168ft
feet 3.0-4.0412.2 Cross Slope (PAR)SF8413.3to $120 $9901576178ft
feet 2.0-3.0413.3 Cross Slope (PAR)SF14415.1to $120 $1,6201576188ft
feet 3.0-4.0417.5 Cross Slope (PAR)SF44423.3to $120 $5,2201576198ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
719
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
AYERS AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001161030
Run ID
E 26Th St
115
ID Sidewalk Width
Priority
feet 2.0-3.0424.1 Cross Slope (PAR)SF13425.8to $120 $1,5301576208ft
feet 3.0-4.0427.9 Cross Slope (PAR)SF8428.9to $120 $9001576218ft
feet 2.0-3.0431.5 Cross Slope (PAR)SF182455.8to $120 $21,8701576228ft
feet -.3437.1 Vertical Change REF8438.1to138059 8 ft
feet 2.0-3.0462.1 Cross Slope (PAR)SF74471.9to $120 $8,8201576238ft
feet 2.0-3.0475.7 Cross Slope (PAR)SF162497.3to $120 $19,4401576248ft
feet .82476.8 Vertical Change REF8477.8to138060 8 ft
feet502.3 Driveway531.5to165920
feet 2.0-3.0531.5 Cross Slope (Driveway)SF13533.2to $40 $5101576258ft
feet 4.0-5.0537.3 Cross Slope (PAR)SF17539.6to $120 $2,0701576268ft
feet 2.0-3.0539.6 Cross Slope (PAR)SF26543.0to $120 $3,0601576278ft
feet 2.0-3.0548.9 Cross Slope (PAR)SF51555.7to $120 $6,1201576288ft
feet 2.0-3.0558.7 Cross Slope (PAR)SF91570.9to $120 $10,9801576298ft
feet 4.0-5.0570.9 Cross Slope (PAR)SF32575.1to $120 $3,7801576308ft
feet 2.0-3.0575.1 Cross Slope (PAR)SF20577.7to $120 $2,3401576318ft
feet 4.0-5.0579.1 Cross Slope (PAR)SF20581.8to $120 $2,4301576328ft
feet 2.0-3.0586.1 Cross Slope (PAR)SF14587.9to $120 $1,6201576338ft
feet 3.0-4.0592.3 Cross Slope (PAR)SF25595.6to $120 $2,9701576348ft
feet .99601.0 Vertical Change REF8602.0to138061 8 ft
feet 3.0-4.0601.9 Cross Slope (PAR)SF8602.9to $120 $9001576358ft
feet 2.0-3.0604.3 Cross Slope (PAR)SF8605.3to $120 $9001576368ft
feet 2.0-3.0607.5 Cross Slope (PAR)SF10608.8to $120 $1,1701576378ft
feet 2.0-3.0614.1 Cross Slope (PAR)SF36618.9to $120 $4,3201576388ft
feet -.3622.0 Vertical Change LF8623.0to $75 $5631380628ft
feet 3.0-4.0626.8 Cross Slope (PAR)SF11628.2to $120 $1,2601576398ft
feet 2.0-3.0628.2 Cross Slope (PAR)SF113643.2to $120 $13,5001576408ft
feet 2.0-3.0650.7 Cross Slope (PAR)SF8651.8to $120 $9901576418ft
feet 2.0-3.0655.3 Cross Slope (PAR)SF186680.1to $120 $22,3201576428ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
720
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
AYERS AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001161030
Run ID
E 26Th St
115
ID Sidewalk Width
Priority
feet 4.0-5.0680.1 Cross Slope (PAR)SF26683.5to $120 $3,0601576438ft
feet 2.0-3.0684.1 Cross Slope (PAR)SF58691.8to $120 $6,9301576448ft
feet 4.0-5.0692.6 Cross Slope (PAR)SF33697.0to $120 $3,9601576458ft
feet 2.0-3.0698.3 Cross Slope (PAR)SF11699.8to $120 $1,3501576468ft
feet 2.0-3.0702.9 Cross Slope (PAR)SF12704.5to $120 $1,4401576478ft
feet 2.0-3.0706.6 Cross Slope (PAR)SF174729.8to $120 $20,8801576488ft
feet 5.0-6.0731.4 Cross Slope (PAR)SF14733.3to $120 $1,7101576498ft
feet 3.0-4.0733.9 Cross Slope (PAR)SF14735.7to $120 $1,6201576508ft
feet 2.0-3.0735.8 Cross Slope (PAR)SF11737.2to $120 $1,2601576518ft
feet 3.0-4.0741.4 Cross Slope (PAR)SF14743.2to $120 $1,6201576528ft
feet .29742.3 Vertical Change REF8743.3to138063 8 ft
feet 2.0-3.0743.2 Cross Slope (PAR)SF11744.7to $120 $1,3501576538ft
feet749.1 Driveway801.8to165921
feet749.1 Driveway825.3to165922
feet 2.0-3.0802.6 Cross Slope (Driveway)SF69811.8to $40 $2,7601576548ft
$420,015.00TOTAL COST FOR:E 26TH STSside of Starting at:AYERS AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
721
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
E 26TH ST
Survey Street Name Starting Street Name
S BONNIE BEACH PL
End Street Name
2001160900
Run ID
E 26Th St
52.75
ID Sidewalk Width
Priority
feet 3.0-4.00.5 Cross Slope (PAR)SF132.2to $120 $1,5301580718ft
feet 2.0-3.02.4 Cross Slope (PAR)SF154.4to $120 $1,8001580728ft
feet 2.0-3.07.6 Cross Slope (PAR)SF6115.7to $120 $7,2901580738ft
feet17.8 Driveway55.3to165948
feet 1.8649.4 Vertical Change REF850.4to138156 8 ft
feet 3.0-4.058.4 Cross Slope (PAR)SF1960.9to $120 $2,2501580748ft
feet 3.0-4.063.3 Cross Slope (PAR)SF2266.2to $120 $2,6101580758ft
feet 3.0-4.069.4 Cross Slope (PAR)SF1971.9to $120 $2,2501580768ft
feet 2.0-3.073.1 Cross Slope (PAR)SF3978.3to $120 $4,6801580778ft
feet 2.0-3.082.2 Cross Slope (PAR)SF8092.9to $120 $9,6301580788ft
feet 2.0-3.095.9 Cross Slope (PAR)SF44101.8to $120 $5,3101580798ft
feet 3.0-4.0105.8 Cross Slope (PAR)SF38110.8to $120 $4,5001580808ft
feet 2.0-3.0112.5 Cross Slope (PAR)SF52119.4to $120 $6,2101580818ft
feet 3.0-4.0122.2 Cross Slope (PAR)SF12123.8to $120 $1,4401580828ft
feet 2.0-3.0126.2 Cross Slope (PAR)SF8127.3to $120 $9901580838ft
feet 3.0-4.0130.1 Cross Slope (PAR)SF66138.9to $120 $7,9201580848ft
feet 2.0-3.0138.9 Cross Slope (PAR)SF58146.7to $120 $7,0201580858ft
feet 4.0-5.0148.2 Cross Slope (PAR)SF91160.3to $120 $10,8901580868ft
feet 4.0-5.0162.8 Cross Slope (PAR)SF10164.1to $120 $1,1701580878ft
feet166.5 Driveway189.9to165949
feet 2.0-3.0191.0 Cross Slope (PAR)SF95203.6to $120 $11,3401580888ft
feet 4.0-5.0203.6 Cross Slope (PAR)SF41209.0to $120 $4,8601580898ft
feet 2.0-3.0214.8 Cross Slope (PAR)SF25218.1to $120 $2,9701580908ft
feet218.1 Driveway256.3to165950
feet .36218.8 Vertical Change REF8219.8to138157 8 ft
feet 4.0-5.0257.6 Cross Slope (PAR)SF91269.7to $120 $10,8901580918ft
feet 5.0-6.0267.3 Running Slope REF10268.6to166620 8 ft
feet270.4 Driveway296.2to165951
feet 3.0-4.0297.5 Cross Slope (PAR)SF73307.2to $120 $8,7301580928ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
722
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
E 26TH ST
Survey Street Name Starting Street Name
S BONNIE BEACH PL
End Street Name
2001160900
Run ID
E 26Th St
52.75
ID Sidewalk Width
Priority
feet 2.0-3.0307.2 Cross Slope (PAR)SF250340.5to $120 $29,9701580938ft
feet 3.0-4.0343.0 Cross Slope (PAR)SF9344.2to $120 $1,0801580948ft
feet 2.0-3.0350.2 Cross Slope (PAR)SF35354.9to $120 $4,2301580958ft
feet 2.0-3.0357.7 Cross Slope (PAR)SF144376.9to $120 $17,2801580968ft
feet 3.0-4.0379.3 Cross Slope (PAR)SF40384.6to $120 $4,7701580978ft
feet 3.0-4.0389.1 Cross Slope (PAR)SF10390.4to $120 $1,1701580988ft
feet 3.0-4.0394.1 Cross Slope (PAR)SF53401.2to $120 $6,3901580998ft
feet .35398.6 Vertical Change REF8399.6to138158 8 ft
feet 3.0-4.0405.9 Cross Slope (PAR)SF77416.2to $120 $9,2701581008ft
feet 2.0-3.0416.2 Cross Slope (PAR)SF101429.6to $120 $12,0601581018ft
feet 2.0-3.0435.9 Cross Slope (PAR)SF131453.3to $120 $15,6601581028ft
feet 2.0-3.0456.1 Cross Slope (PAR)SF9457.3to $120 $1,0801581038ft
feet 4.0-5.0458.3 Cross Slope (PAR)SF53465.3to $120 $6,3001581048ft
feet 2.0-3.0466.1 Cross Slope (PAR)SF148485.8to $120 $17,7301581058ft
feet .69470.2 Vertical Change REF8471.2to138159 8 ft
feet487.5 Driveway586.6to165952
feet 1.44522.2 Vertical Change REF8523.2to138160 8 ft
feet .28565.0 Vertical Change REF8566.0to138161 8 ft
feet 5.0-6.0586.6 Cross Slope (Driveway)SF37591.5to $40 $1,4701581068ft
feet 3.0-4.0591.7 Cross Slope (PAR)SF8592.8to $120 $9901581078ft
feet 3.0-4.0603.9 Cross Slope (PAR)SF35608.5to $120 $4,1401581088ft
feet610.6 Driveway635.2to165953
feet 3.04620.1 Vertical Change REF8621.1to138162 8 ft
feet 4.0-5.0635.9 Cross Slope (PAR)SF25639.2to $120 $2,9701581098ft
feet 4.0-5.0642.7 Cross Slope (PAR)SF8643.8to $120 $9901581108ft
feet 2.0-3.0646.8 Cross Slope (PAR)SF10648.1to $120 $1,1701581118ft
feet 2.0-3.0657.1 Cross Slope (PAR)SF62665.3to $120 $7,3801581128ft
feet666.8 Driveway690.5to165954
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
723
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
E 26TH ST
Survey Street Name Starting Street Name
S BONNIE BEACH PL
End Street Name
2001160900
Run ID
E 26Th St
52.75
ID Sidewalk Width
Priority
feet 4.0-5.0691.0 Cross Slope (PAR)SF51697.8to $120 $6,1201581138ft
feet 3.0-4.0700.3 Cross Slope (PAR)SF9701.5to $120 $1,0801581148ft
feet 3.0-4.0705.0 Cross Slope (PAR)SF92717.2to $120 $10,9801581158ft
feet 3.0-4.0719.6 Cross Slope (PAR)SF123736.0to $120 $14,7601581168ft
feet 2.0-3.0737.5 Cross Slope (PAR)SF11738.9to $120 $1,2601581178ft
feet 2.0-3.0746.3 Cross Slope (PAR)SF8747.4to $120 $9901581188ft
feet 3.0-4.0752.2 Cross Slope (PAR)SF11753.7to $120 $1,3501581198ft
feet 2.0-3.0756.8 Cross Slope (PAR)SF20759.4to $120 $2,3401581208ft
feet 2.0-3.0765.9 Cross Slope (PAR)SF13767.6to $120 $1,5301581218ft
feet 2.0-3.0777.9 Cross Slope (PAR)SF9779.1to $120 $1,0801581228ft
feet 2.0-3.0785.9 Cross Slope (PAR)SF14787.8to $120 $1,7101581238ft
feet 2.0-3.0792.9 Cross Slope (PAR)SF50799.5to $120 $5,9401581248ft
feet804.5 Driveway850.2to165955
feet .91822.6 Vertical Change REF8823.6to138163 8 ft
feet 2.0-3.0855.0 Cross Slope (PAR)SF30859.0to $120 $3,6001581258ft
feet 2.0-3.0864.5 Cross Slope (PAR)SF45870.5to $120 $5,4001581268ft
feet 3.0-4.0872.7 Cross Slope (PAR)SF14874.5to $120 $1,6201581278ft
feet 2.0-3.0877.3 Cross Slope (PAR)SF8878.3to $120 $9001581288ft
feet 2.0-3.0884.7 Cross Slope (PAR)SF12886.3to $120 $1,4401581298ft
feet 3.0-4.0893.8 Cross Slope (PAR)SF29897.7to $120 $3,5101581308ft
feet 2.0-3.0898.0 Cross Slope (PAR)SF13899.7to $120 $1,5301581318ft
feet 2.0-3.0902.4 Cross Slope (PAR)SF8903.5to $120 $9901581328ft
feet 2.0-3.0907.8 Cross Slope (PAR)SF98920.8to $120 $11,7001581338ft
feet 2.0-3.0925.3 Cross Slope (PAR)SF117940.9to $120 $14,0401581348ft
feet 4.0-5.0941.4 Cross Slope (PAR)SF26944.9to $120 $3,1501581358ft
feet 2.0-3.0947.6 Cross Slope (PAR)SF77957.9to $120 $9,2701581368ft
feet 2.0-3.0960.6 Cross Slope (PAR)SF64969.1to $120 $7,6501581378ft
feet 3.0-4.0972.3 Cross Slope (PAR)SF20974.9to $120 $2,3401581388ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
724
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
E 26TH ST
Survey Street Name Starting Street Name
S BONNIE BEACH PL
End Street Name
2001160900
Run ID
E 26Th St
52.75
ID Sidewalk Width
Priority
feet 3.26972.8 Vertical Change REF8973.8to138164 8 ft
feet 3.0-4.0980.8 Cross Slope (PAR)SF22983.7to $120 $2,6101581398ft
feet990.1 Driveway1036.8to165956
feet990.1 Driveway1114.2to165957
feet 2.0-3.01036.8 Cross Slope (Driveway)SF111038.2to $40 $4201581408ft
feet 2.0-3.01056.6 Cross Slope (Driveway)SF181059.0to $40 $7201581418ft
feet 2.321062.5 Vertical Change REF81063.5to138165 8 ft
feet 5.0-6.01075.4 Cross Slope (Driveway)SF251078.8to $40 $1,0201581428ft
feet 2.0-3.01079.8 Cross Slope (Driveway)SF111081.2to $40 $4201581438ft
feet 4.0-5.01083.7 Cross Slope (Driveway)SF741093.6to $40 $2,9701581448ft
feet 3.111088.8 Vertical Change REF81089.8to138166 8 ft
feet 4.0-5.01096.4 Cross Slope (Driveway)SF81097.5to $40 $3301581458ft
feet 3.0-4.01102.6 Cross Slope (Driveway)SF81103.6to $40 $3001581468ft
feet 2.0-3.01104.7 Cross Slope (Driveway)SF251108.0to $40 $9901581478ft
feet 4.0-5.01111.2 Cross Slope (Driveway)SF181113.6to $40 $7201581488ft
$389,160.00TOTAL COST FOR:E 26TH STSside of Starting at:E 26TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
725
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
HARRIET ST
Survey Street Name Starting Street Name
MINERVA ST
End Street Name
1911211600
Run ID
E 26Th St
55.5
ID Sidewalk Width
Priority
feet 2.0-3.01.3 Cross Slope (PAR)SF22028.8to $120 $26,4001416538ft
feet 2.0-3.032.7 Cross Slope (PAR)SF12548.3to $120 $14,9761416548ft
feet 2.0-3.051.4 Cross Slope (PAR)SF8762.3to $120 $10,4641416558ft
feet 2.0-3.070.8 Cross Slope (PAR)SF3475.1to $120 $4,1281416568ft
feet 2.0-3.078.4 Cross Slope (PAR)SF3182.3to $120 $3,7441416578ft
feet 2.0-3.088.4 Cross Slope (PAR)SF1189.8to $120 $1,3441416588ft
feet97.6 Cold Patch 36102.1to140261 8 ft
feet -.2797.7 Vertical Change LF898.7to $75 $6001334248ft
feet .2799.6 Vertical Change LF8100.6to $75 $6001334258ft
feet 2.0-3.0103.2 Cross Slope (PAR)SF262136.0to $120 $31,4881416598ft
feet .34110.3 Vertical Change REF8111.3to133426 8 ft
feet .27136.3 Vertical Change LF8137.3to $75 $6001334278ft
feet 2.0-3.0139.7 Cross Slope (PAR)SF86150.4to $120 $10,2721416608ft
feet -.27144.8 Vertical Change REF8145.8to133428 8 ft
feet .33151.8 Vertical Change LF8152.8to $75 $6001334298ft
feet -.31153.5 Vertical Change LF8154.5to $75 $6001334308ft
feet 2.0-3.0156.3 Cross Slope (PAR)SF49162.4to $120 $5,8561416618ft
feet162.9 Driveway207.8to164557
feet -.26166.8 Vertical Change REF8167.8to133431 8 ft
feet -.37184.8 Vertical Change REF8185.8to133432 8 ft
feet .28193.8 Vertical Change REF8194.8to133433 8 ft
feet .27207.6 Vertical Change REF8208.6to133434 8 ft
feet 2.0-3.0208.5 Cross Slope (Driveway)SF22211.2to $40 $8641416628ft
feet 2.0-3.0214.8 Cross Slope (PAR)SF44220.3to $120 $5,2801416638ft
feet .79216.5 Vertical Change REF8217.5to133435 8 ft
feet 2.0-3.0223.3 Cross Slope (PAR)SF26226.6to $120 $3,1681416648ft
feet 3.0-4.0229.6 Cross Slope (PAR)SF10230.9to $120 $1,2481416658ft
feet239.0 Driveway282.3to164558
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
726
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
HARRIET ST
Survey Street Name Starting Street Name
MINERVA ST
End Street Name
1911211600
Run ID
E 26Th St
55.5
ID Sidewalk Width
Priority
feet -.33260.3 Vertical Change REF8261.3to133436 8 ft
feet 5.0-6.0282.7 Cross Slope (PAR)SF20285.2to $120 $2,4001416668ft
feet 3.0-4.0285.2 Cross Slope (PAR)SF24288.2to $120 $2,8801416678ft
feet 5.0-6.0288.2 Cross Slope (PAR)SF49294.3to $120 $5,8561416688ft
feet 3.0-4.0294.3 Cross Slope (PAR)SF158314.1to $120 $19,0081416698ft
feet 2.0-3.0314.1 Cross Slope (PAR)SF124329.6to $120 $14,8801416708ft
feet 2.0-3.0331.9 Cross Slope (PAR)SF158351.7to $120 $19,0081416718ft
feet 1.83332.3 Vertical Change REF8333.3to133437 8 ft
feet 2.0-3.0355.6 Cross Slope (PAR)SF254387.3to $120 $30,4321416728ft
feet 2.0-3.0389.4 Cross Slope (PAR)SF68397.9to $120 $8,1601416738ft
feet 2.0-3.0400.0 Cross Slope (PAR)SF190423.7to $120 $22,7521416748ft
feet 2.0-3.0429.3 Cross Slope (PAR)SF11430.7to $120 $1,3441416758ft
feet 2.0-3.0432.8 Cross Slope (PAR)SF106446.0to $120 $12,6721416768ft
feet 2.0-3.0448.7 Cross Slope (PAR)SF12450.2to $120 $1,4401416778ft
feet 2.0-3.0457.3 Cross Slope (PAR)SF32461.3to $120 $3,8401416788ft
feet 2.0-3.0465.1 Cross Slope (PAR)SF48471.1to $120 $5,7601416798ft
feet 3.0-4.0474.0 Cross Slope (PAR)SF34478.2to $120 $4,0321416808ft
feet 2.0-3.0478.2 Cross Slope (PAR)SF26481.5to $120 $3,1681416818ft
feet .27486.2 Vertical Change REF8487.2to133438 8 ft
feet 3.0-4.0487.2 Cross Slope (PAR)SF42492.4to $120 $4,9921416828ft
feet 2.0-3.0492.8 Cross Slope (PAR)SF56499.8to $120 $6,7201416838ft
feet 4.0-5.0500.2 Cross Slope (PAR)SF9501.3to $120 $1,0561416848ft
$292,632.00TOTAL COST FOR:E 26TH STNside of Starting at:HARRIET ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
727
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
HARRIET ST
Survey Street Name Starting Street Name
2640 E 26TH ST
End Street Name
1912041332
Run ID
E 26Th St
68
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF91.7to $120 $1,0201612585ft
feet1.9 Driveway33.5to166196
feet3.8 Continuous Width REF54.8to167013 5 ft
feet 2.0-3.034.3 Cross Slope (Driveway)SF2839.9to $40 $1,1201612595ft
feet -.6838.1 Vertical Change REF539.1to139135 5 ft
feet 2.0-3.045.4 Cross Slope (PAR)SF846.9to $120 $9001612605ft
feet 4.0-5.049.5 Cross Slope (PAR)SF851.1to $120 $9601612615ft
feet 3.0-4.053.3 Cross Slope (PAR)SF22898.8to $120 $27,3001612625ft
feet -.3397.5 Vertical Change REF598.5to139136 5 ft
feet 5.0-6.099.6 Cross Slope (PAR)SF6100.7to $120 $6601612635ft
feet 6.0-7.0100.8 Cross Slope (PAR)SF7102.1to $120 $7801612645ft
feet 5.0-6.0103.5 Cross Slope (PAR)SF17106.9to $120 $2,0401612655ft
feet 3.0-4.0106.9 Cross Slope (PAR)SF68120.4to $120 $8,1001612665ft
feet 3.0-4.0122.8 Cross Slope (PAR)SF13125.3to $120 $1,5001612675ft
feet 4.0-5.0127.4 Cross Slope (PAR)SF36134.7to $120 $4,3801612685ft
feet 2.0-3.0134.7 Cross Slope (PAR)SF28140.3to $120 $3,3601612695ft
feet 3.0-4.0142.5 Cross Slope (PAR)SF22146.8to $120 $2,5801612705ft
feet 2.0-3.0146.8 Cross Slope (PAR)SF8148.3to $120 $9001612715ft
feet -.58149.8 Vertical Change SF5150.8to $75 $3751391375ft
feet 3.0-4.0151.4 Cross Slope (PAR)SF6152.7to $120 $7801612725ft
feet 2.0-3.0154.4 Cross Slope (PAR)SF88172.0to $120 $10,5601612735ft
feet -.36167.0 Vertical Change REF5168.0to139138 5 ft
feet179.1 Driveway219.9to166197
feet 2.0-3.0222.0 Cross Slope (PAR)SF54232.7to $120 $6,4201612745ft
feet 2.0-3.0238.9 Cross Slope (PAR)SF18242.4to $120 $2,1001612755ft
feet255.5 Driveway292.3to166198
feet .33282.2 Vertical Change REF5283.2to139139 5 ft
feet 2.0-3.0364.9 Cross Slope (PAR)SF11367.0to $120 $1,2601612765ft
feet377.5 Driveway472.1to166199
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
728
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
HARRIET ST
Survey Street Name Starting Street Name
2640 E 26TH ST
End Street Name
1912041332
Run ID
E 26Th St
68
ID Sidewalk Width
Priority
feet377.5 Driveway694.4to166200
feet .27396.4 Vertical Change REF5397.4to139140 5 ft
feet -.28423.2 Vertical Change REF5424.2to139141 5 ft
feet -.49445.0 Vertical Change REF5446.0to139142 5 ft
feet .28453.4 Vertical Change REF5454.4to139143 5 ft
feet 3.0-4.0472.7 Cross Slope (Driveway)SF5473.7to $40 $2001612775ft
feet 2.0-3.0474.3 Cross Slope (Driveway)SF9476.1to $40 $3601612785ft
feet 2.0-3.0479.6 Cross Slope (Driveway)SF31485.8to $40 $1,2401612795ft
feet .45487.2 Vertical Change REF5488.2to139144 5 ft
feet -.88489.5 Vertical Change REF5490.5to139145 5 ft
feet 5.0-6.0490.8 Cross Slope (Driveway)SF27496.2to $40 $1,0801612805ft
feet .41492.0 Vertical Change REF5493.0to139146 5 ft
feet 2.0-3.0497.8 Cross Slope (Driveway)SF110519.8to $40 $4,4001612815ft
feet 5.0-6.0521.6 Cross Slope (Driveway)SF5522.6to $40 $2001612825ft
feet 4.0-5.0525.9 Cross Slope (Driveway)SF42534.3to $40 $1,6801612835ft
feet 2.0-3.0535.8 Cross Slope (Driveway)SF65548.8to $40 $2,6001612845ft
feet 4.0-5.0550.5 Cross Slope (Driveway)SF18554.0to $40 $7001612855ft
feet 2.0-3.0557.8 Cross Slope (Driveway)SF19561.5to $40 $7401612865ft
feet 3.0-4.0564.2 Cross Slope (Driveway)SF70578.3to $40 $2,8201612875ft
feet 5.0-6.0579.8 Cross Slope (Driveway)SF10581.8to $40 $4001612885ft
feet 4.0-5.0584.8 Cross Slope (Driveway)SF33591.4to $40 $1,3201612895ft
feet 6.0-7.0591.9 Cross Slope (Driveway)SF6593.1to $40 $2401612905ft
feet 5.0-6.0595.6 Cross Slope (Driveway)SF178631.1to $40 $7,1001612915ft
feet 6.0-7.0632.0 Cross Slope (Driveway)SF16635.2to $40 $6401612925ft
feet 7.0-8.0638.0 Cross Slope (Driveway)SF7639.4to $40 $2801612935ft
feet 5.0-6.0641.8 Cross Slope (Driveway)SF32648.1to $40 $1,2601612945ft
feet 3.0-4.0649.2 Cross Slope (Driveway)SF15652.3to $40 $6201612955ft
feet 2.0-3.0653.6 Cross Slope (Driveway)SF61665.7to $40 $2,4201612965ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
729
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
HARRIET ST
Survey Street Name Starting Street Name
2640 E 26TH ST
End Street Name
1912041332
Run ID
E 26Th St
68
ID Sidewalk Width
Priority
feet 2.0-3.0670.7 Cross Slope (Driveway)SF119694.4to $40 $4,7401612975ft
$112,135.00TOTAL COST FOR:E 26TH STSside of Starting at:HARRIET ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
730
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
MINERVA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911211616
Run ID
E 26Th St
63
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF648.2to $120 $7,6261415898ft
feet 4.0-5.08.2 Cross Slope (PAR)SF4714.3to $120 $5,6731415908ft
feet 3.0-4.016.8 Cross Slope (PAR)SF1618.8to $120 $1,8601415918ft
feet 2.0-3.018.8 Cross Slope (PAR)SF3723.6to $120 $4,4641415928ft
feet 1.4320.5 Vertical Change REF821.5to133409 8 ft
feet 4.0-5.023.6 Cross Slope (PAR)SF5130.2to $120 $6,1381415938ft
feet 5.0-6.032.4 Cross Slope (PAR)SF1233.9to $120 $1,3951415948ft
feet 4.0-5.037.2 Cross Slope (PAR)SF12252.9to $120 $14,6011415958ft
feet 5.0-6.057.2 Cross Slope (PAR)SF958.3to $120 $1,0231415968ft
feet 6.0-7.058.6 Cross Slope (PAR)SF959.7to $120 $1,0231415978ft
feet 5.0-6.059.7 Cross Slope (PAR)SF960.9to $120 $1,1161415988ft
feet 6.0-7.060.9 Cross Slope (PAR)SF5067.3to $120 $5,9521415998ft
feet .3665.6 Vertical Change REF866.6to133410 8 ft
feet 6.0-7.069.8 Cross Slope (PAR)SF1271.3to $120 $1,3951416008ft
feet 5.0-6.071.3 Cross Slope (PAR)SF2174.0to $120 $2,5111416018ft
feet 3.0-4.074.4 Cross Slope (PAR)SF7183.6to $120 $8,5561416028ft
feet 5.0-6.083.6 Cross Slope (PAR)SF1285.2to $120 $1,4881416038ft
feet .5987.0 Vertical Change SF888.0to $75 $5811334118ft
feet 3.0-4.088.4 Cross Slope (PAR)SF1490.2to $120 $1,6741416048ft
feet 3.0-4.097.5 Cross Slope (PAR)SF33101.7to $120 $3,9061416058ft
feet 2.0-3.0103.3 Cross Slope (PAR)SF116118.3to $120 $13,9501416068ft
feet 2.0-3.0121.4 Cross Slope (PAR)SF23124.4to $120 $2,7901416078ft
feet 2.0-3.0128.4 Cross Slope (PAR)SF33132.6to $120 $3,9061416088ft
feet 2.0-3.0136.1 Cross Slope (PAR)SF192160.9to $120 $23,0641416098ft
feet .5157.6 Vertical Change REF8158.6to133412 8 ft
feet 2.0-3.0164.3 Cross Slope (PAR)SF9165.5to $120 $1,1161416108ft
feet 2.0-3.0171.0 Cross Slope (PAR)SF294208.9to $120 $35,2471416118ft
feet .32183.4 Vertical Change REF8184.4to133413 8 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
731
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
MINERVA ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911211616
Run ID
E 26Th St
63
ID Sidewalk Width
Priority
feet 4.0-5.0211.2 Cross Slope (PAR)SF26214.5to $120 $3,0691416128ft
feet 2.0-3.0223.3 Cross Slope (PAR)SF52230.0to $120 $6,2311416138ft
feet 4.0-5.0230.3 Cross Slope (PAR)SF25233.5to $120 $2,9761416148ft
feet233.5 Driveway249.5to164552
feet 6.0-7.0251.7 Cross Slope (PAR)SF12253.3to $120 $1,4881416158ft
feet 5.0-6.0253.3 Cross Slope (PAR)SF43258.9to $120 $5,2081416168ft
feet 4.0-5.0261.2 Cross Slope (PAR)SF29265.0to $120 $3,5341416178ft
feet 6.0-7.0265.0 Cross Slope (PAR)SF42270.4to $120 $5,0221416188ft
feet 5.0-6.0270.8 Cross Slope (PAR)SF33275.0to $120 $3,9061416198ft
feet 3.0-4.0275.0 Cross Slope (PAR)SF19277.5to $120 $2,3251416208ft
feet 2.0-3.0277.5 Cross Slope (PAR)SF29281.2to $120 $3,4411416218ft
feet 4.0-5.0282.0 Cross Slope (PAR)SF227311.3to $120 $27,2491416228ft
feet 2.29297.5 Vertical Change REF8298.5to133414 8 ft
feet 2.0-3.0311.3 Cross Slope (PAR)SF59318.9to $120 $7,0681416238ft
feet 4.0-5.0320.0 Cross Slope (PAR)SF22322.9to $120 $2,6971416248ft
feet 4.0-5.0326.2 Cross Slope (PAR)SF288363.3to $120 $34,5031416258ft
feet .44352.3 Vertical Change REF8353.3to133415 8 ft
feet363.3 Driveway391.3to164553
feet .31372.6 Vertical Change REF8373.6to133416 8 ft
feet .44377.1 Vertical Change REF8378.1to133417 8 ft
$259,772.25TOTAL COST FOR:E 26TH STNside of Starting at:MINERVA ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
732
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S BONNIE BEACH PL
Survey Street Name Starting Street Name
4366 E 26TH ST
End Street Name
2001160944
Run ID
E 26Th St
66.25
ID Sidewalk Width
Priority
feet 4.0-5.00.8 Cross Slope (PAR)SF315.4to $120 $3,7261578767ft
feet 5.0-6.08.0 Cross Slope (PAR)SF79.1to $120 $8911578777ft
feet 2.0-3.012.5 Cross Slope (PAR)SF2616.4to $120 $3,1591578787ft
feet16.5 Continuous Width REF717.5to167003 7 ft
feet 4.0-5.016.6 Cross Slope (PAR)SF3621.9to $120 $4,2931578797ft
feet 2.0-3.026.0 Cross Slope (PAR)SF4532.7to $120 $5,4271578807ft
feet28.4 Continuous Width REF729.4to167330 7 ft
feet 4.0-5.034.1 Cross Slope (PAR)SF1736.6to $120 $2,0251578817ft
feet 2.0-3.039.0 Cross Slope (PAR)SF1641.4to $120 $1,9441578827ft
feet 2.0-3.053.3 Cross Slope (PAR)SF6563.0to $120 $7,8571578837ft
feet 4.0-5.063.0 Cross Slope (PAR)SF1765.5to $120 $2,0251578847ft
feet 2.0-3.066.3 Cross Slope (PAR)SF1168.0to $120 $1,3771578857ft
feet 2.0-3.070.7 Cross Slope (PAR)SF771.7to $120 $8101578867ft
feet 3.0-4.073.8 Cross Slope (PAR)SF1676.1to $120 $1,8631578877ft
feet 2.0-3.082.0 Cross Slope (PAR)SF8194.0to $120 $9,7201578887ft
feet 4.0-5.096.4 Cross Slope (PAR)SF113113.1to $120 $13,5271578897ft
feet 4.0-5.0115.8 Cross Slope (PAR)SF13117.7to $120 $1,5391578907ft
feet 7.0-8.0119.4 Cross Slope (PAR)SF52127.1to $120 $6,2371578917ft
feet 2.0-3.0129.7 Cross Slope (PAR)SF78141.3to $120 $9,3961578927ft
feet 2.0-3.0144.2 Cross Slope (PAR)SF20147.2to $120 $2,4301578937ft
feet147.2 Driveway182.9to165931
feet 3.0-4.0185.1 Cross Slope (PAR)SF70195.4to $120 $8,3431578947ft
feet 2.0-3.0195.4 Cross Slope (PAR)SF47202.4to $120 $5,6701578957ft
feet 3.31202.1 Vertical Change REF7203.1to138113 7 ft
feet 2.0-3.0208.3 Cross Slope (PAR)SF61217.4to $120 $7,3711578967ft
feet 5.0-6.0215.0 Running Slope REF11216.6to166614 7 ft
feet217.4 Driveway252.3to165932
feet 2.0-3.0253.4 Cross Slope (PAR)SF28257.6to $120 $3,4021578977ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
733
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S BONNIE BEACH PL
Survey Street Name Starting Street Name
4366 E 26TH ST
End Street Name
2001160944
Run ID
E 26Th St
66.25
ID Sidewalk Width
Priority
feet 4.0-5.0261.0 Cross Slope (PAR)SF81273.0to $120 $9,7201578987ft
feet270.6 Continuous Width SF7271.6to $120 $8101678627ft
feet 6.0-7.0273.0 Cross Slope (PAR)SF12274.8to $120 $1,4581578997ft
feet 5.0-6.0274.8 Cross Slope (PAR)SF14276.8to $120 $1,6201579007ft
feet 3.0-4.0277.2 Cross Slope (PAR)SF18279.9to $120 $2,1871579017ft
feet283.2 Continuous Width SF7284.2to $120 $8101678617ft
feet 3.0-4.0284.7 Cross Slope (PAR)SF53292.5to $120 $6,3181579027ft
feet .87290.6 Vertical Change REF7291.6to138114 7 ft
feet 2.0-3.0292.8 Cross Slope (PAR)SF146314.4to $120 $17,4961579037ft
feet 2.0-3.0327.8 Cross Slope (PAR)SF98342.3to $120 $11,7451579047ft
feet343.0 Driveway368.2to165933
feet .68367.5 Vertical Change REF7368.5to138115 7 ft
feet 3.0-4.0370.2 Cross Slope (PAR)SF71380.7to $120 $8,5051579057ft
feet374.8 Continuous Width REF7375.8to167762 7 ft
feet 3.0-4.0383.3 Cross Slope (PAR)SF9384.6to $120 $1,0531579067ft
feet 2.0-3.0384.6 Cross Slope (PAR)SF70395.0to $120 $8,4241579077ft
feet 3.0-4.0402.3 Cross Slope (PAR)SF22405.6to $120 $2,6731579087ft
feet 2.0-3.0407.3 Cross Slope (PAR)SF15409.5to $120 $1,7821579097ft
feet 2.0-3.0415.6 Cross Slope (PAR)SF74426.6to $120 $8,9101579107ft
feet 3420.5 Vertical Change REF7421.5to138116 7 ft
feet 4.0-5.0427.5 Cross Slope (PAR)SF15429.7to $120 $1,7821579117ft
feet 2.0-3.0431.1 Cross Slope (PAR)SF69441.3to $120 $8,2621579127ft
feet .31435.7 Vertical Change REF7436.7to138117 7 ft
feet 2.0-3.0449.3 Cross Slope (PAR)SF51456.8to $120 $6,0751579137ft
feet 3.0-4.0459.3 Cross Slope (PAR)SF73470.1to $120 $8,7481579147ft
feet 5.0-6.0470.5 Cross Slope (PAR)SF32475.2to $120 $3,8071579157ft
feet 2.0-3.0482.0 Cross Slope (PAR)SF7483.0to $120 $8101579167ft
feet 2.0-3.0488.9 Cross Slope (PAR)SF8490.1to $120 $9721579177ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
734
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S BONNIE BEACH PL
Survey Street Name Starting Street Name
4366 E 26TH ST
End Street Name
2001160944
Run ID
E 26Th St
66.25
ID Sidewalk Width
Priority
feet 2.0-3.0494.3 Cross Slope (PAR)SF15496.5to $120 $1,7821579187ft
feet 3.0-4.0501.0 Cross Slope (PAR)SF20504.0to $120 $2,4301579197ft
feet 5.0-6.0506.9 Cross Slope (PAR)SF25510.6to $120 $2,9971579207ft
feet 4.0-5.0514.0 Cross Slope (PAR)SF17516.5to $120 $2,0251579217ft
feet 4.0-5.0519.7 Cross Slope (PAR)SF196548.7to $120 $23,4901579227ft
feet 1.9539.1 Vertical Change REF7540.1to138118 7 ft
feet 2.0-3.0550.8 Cross Slope (PAR)SF34555.9to $120 $4,1311579237ft
feet 3.0-4.0561.4 Cross Slope (PAR)SF21564.5to $120 $2,5111579247ft
feet 2.0-3.0565.3 Cross Slope (PAR)SF39571.1to $120 $4,6981579257ft
feet 5.0-6.0568.5 Running Slope REF8569.7to166615 7 ft
feet571.3 Driveway604.7to165934
feet 2.0-3.0620.2 Cross Slope (PAR)SF26624.1to $120 $3,1591579267ft
feet 2.0-3.0629.6 Cross Slope (PAR)SF17632.1to $120 $2,0251579277ft
feet 2.0-3.0634.3 Cross Slope (PAR)SF47641.2to $120 $5,5891579287ft
feet 2.0-3.0653.8 Cross Slope (PAR)SF11655.4to $120 $1,2961579297ft
feet655.1 Continuous Width REF7656.1to167763 7 ft
feet656.7 Driveway688.6to165935
feet 3.0-4.0690.8 Cross Slope (PAR)SF11692.5to $120 $1,3771579307ft
feet 2.0-3.0692.5 Cross Slope (PAR)SF93706.3to $120 $11,1781579317ft
feet -.27700.9 Vertical Change REF7701.9to138119 7 ft
feet 2.0-3.0711.4 Cross Slope (PAR)SF28715.5to $120 $3,3211579327ft
feet .3712.3 Vertical Change REF7713.3to138120 7 ft
feet 2.0-3.0720.4 Cross Slope (PAR)SF134740.2to $120 $16,0381579337ft
feet 2.0-3.0744.1 Cross Slope (PAR)SF11745.8to $120 $1,3771579347ft
feet 2.0-3.0752.3 Cross Slope (PAR)SF10753.8to $120 $1,2151579357ft
feet757.7 Driveway796.1to165936
feet 4.0-5.0796.1 Cross Slope (Driveway)SF15798.3to $40 $5941579367ft
feet 3.0-4.0805.6 Cross Slope (PAR)SF27809.6to $120 $3,2401579377ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
735
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S BONNIE BEACH PL
Survey Street Name Starting Street Name
4366 E 26TH ST
End Street Name
2001160944
Run ID
E 26Th St
66.25
ID Sidewalk Width
Priority
feet 3.0-4.0812.4 Cross Slope (PAR)SF36817.8to $120 $4,3741579387ft
feet 3.0-4.0820.2 Cross Slope (PAR)SF38825.9to $120 $4,6171579397ft
feet 3.0-4.0828.9 Cross Slope (PAR)SF84841.3to $120 $10,0441579407ft
feet 2.0-3.0842.3 Cross Slope (PAR)SF111858.8to $120 $13,3651579417ft
feet 2.42844.0 Vertical Change REF7845.0to138121 7 ft
feet 4.0-5.0859.1 Cross Slope (PAR)SF28863.2to $120 $3,3211579427ft
feet 3.0-4.0865.5 Cross Slope (PAR)SF32870.3to $120 $3,8881579437ft
feet 4.0-5.0872.8 Cross Slope (PAR)SF155895.8to $120 $18,6301579447ft
feet .44875.8 Vertical Change REF7876.8to138122 7 ft
feet .37880.8 Vertical Change REF7881.8to138123 7 ft
feet 2.0-3.0896.3 Cross Slope (PAR)SF67906.2to $120 $8,0191579457ft
feet -.28896.8 Vertical Change REF7897.8to138124 7 ft
feet909.1 Driveway959.3to165937
$377,730.00TOTAL COST FOR:E 26TH STSside of Starting at:S BONNIE BEACH PL
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
736
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW E 26TH ST
Street Side
S DOWNEY RD
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
2001171218
Run ID
E 26Th St
50.75
ID Sidewalk Width
Priority
feet 3.0-4.00.2 Cross Slope (PAR)SF232.5to $120 $2,76015822310ft
feet 4.0-5.05.1 Cross Slope (PAR)SF136.4to $120 $1,56015822410ft
feet 2.0-3.07.8 Cross Slope (PAR)SF15022.8to $120 $18,00015822510ft
feet 4.0-5.023.3 Cross Slope (PAR)SF9232.5to $120 $11,04015822610ft
feet 2.0-3.033.9 Cross Slope (PAR)SF25459.3to $120 $30,48015822710ft
feet 5.0-6.039.3 Running Slope REF1440.7to166623 10 ft
feet 2.0-3.062.1 Cross Slope (PAR)SF6068.1to $120 $7,20015822810ft
feet 2.0-3.083.0 Cross Slope (PAR)SF1184.1to $120 $1,32015822910ft
feet 5.0-6.085.8 Cross Slope (PAR)SF3989.7to $120 $4,68015823010ft
feet 3.0-4.089.9 Cross Slope (PAR)SF5995.8to $120 $7,08015823110ft
feet 2.0-3.096.8 Cross Slope (PAR)SF3099.8to $120 $3,60015823210ft
feet 4.0-5.0100.8 Cross Slope (PAR)SF458146.6to $120 $54,96015823310ft
feet 2.0-3.0149.6 Cross Slope (PAR)SF74157.0to $120 $8,88015823410ft
feet 2.0-3.0160.2 Cross Slope (PAR)SF39164.1to $120 $4,68015823510ft
feet 2.0-3.0169.4 Cross Slope (PAR)SF81177.5to $120 $9,72015823610ft
feet 3.0-4.0182.7 Cross Slope (PAR)SF11183.8to $120 $1,32015823710ft
feet184.8 Driveway220.7to165962
feet 2.0-3.0220.9 Cross Slope (Driveway)SF24223.3to $40 $96015823810ft
feet 2.0-3.0225.6 Cross Slope (PAR)SF18227.4to $120 $2,16015823910ft
feet 4.0-5.0228.7 Cross Slope (PAR)SF138242.5to $120 $16,56015824010ft
feet 2.0-3.0242.5 Cross Slope (PAR)SF144256.9to $120 $17,28015824110ft
feet 2.0-3.0260.4 Cross Slope (PAR)SF10261.4to $120 $1,20015824210ft
$205,440.00TOTAL COST FOR:E 26TH STSWside of Starting at:S DOWNEY RD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
737
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
E 26TH ST
End Street Name
2001160852
Run ID
E 26Th St
42.75
ID Sidewalk Width
Priority
feet 5.0-6.00.0 Cross Slope (PAR)SF233.1to $120 $2,7901581498ft
feet10.3 Cold Patch 2012.9to140559 8 ft
feet -.5311.1 Vertical Change SF812.1to $75 $5631381678ft
feet 3.0-4.012.9 Cross Slope (PAR)SF2716.5to $120 $3,2401581508ft
feet 2.0-3.017.5 Cross Slope (PAR)SF17240.4to $120 $20,6101581518ft
feet 4.0-5.040.4 Cross Slope (PAR)SF5647.9to $120 $6,7501581528ft
feet 2.0-3.047.9 Cross Slope (PAR)SF15468.4to $120 $18,4501581538ft
feet 2.0-3.071.8 Cross Slope (PAR)SF4277.4to $120 $5,0401581548ft
feet 2.0-3.086.8 Cross Slope (PAR)SF2590.1to $120 $2,9701581558ft
feet 2.0-3.092.3 Cross Slope (PAR)SF2295.2to $120 $2,6101581568ft
feet 2.0-3.097.3 Cross Slope (PAR)SF90109.3to $120 $10,8001581578ft
feet 4.0-5.0110.3 Cross Slope (PAR)SF8111.3to $120 $9001581588ft
feet 2.0-3.0112.7 Cross Slope (PAR)SF30116.7to $120 $3,6001581598ft
feet 4.0-5.0116.9 Cross Slope (PAR)SF29120.7to $120 $3,4201581608ft
feet 2.0-3.0120.7 Cross Slope (PAR)SF129137.9to $120 $15,4801581618ft
feet 2.0-3.0142.3 Cross Slope (PAR)SF118158.1to $120 $14,2201581628ft
feet -.32158.4 Vertical Change LF8159.4to $75 $5631381688ft
feet 2.0-3.0160.3 Cross Slope (PAR)SF10161.6to $120 $1,1701581638ft
feet .46160.6 Vertical Change REF8161.6to138169 8 ft
feet 4.0-5.0162.0 Cross Slope (PAR)SF16164.1to $120 $1,8901581648ft
feet165.4 Driveway195.3to165958
feet 2.0-3.0195.3 Cross Slope (Driveway)SF10196.6to $40 $3901581658ft
feet 2.0-3.0204.3 Cross Slope (PAR)SF131221.8to $120 $15,7501581668ft
feet221.8 Driveway256.2to165959
feet -.4254.7 Vertical Change REF8255.7to138170 8 ft
feet 3.0-4.0256.2 Cross Slope (Driveway)SF11257.6to $40 $4201581678ft
feet 2.0-3.0257.6 Cross Slope (PAR)SF21260.4to $120 $2,5201581688ft
feet 2.0-3.0267.3 Cross Slope (PAR)SF36272.1to $120 $4,3201581698ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
738
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
E 26TH ST
End Street Name
2001160852
Run ID
E 26Th St
42.75
ID Sidewalk Width
Priority
feet 2.0-3.0275.9 Cross Slope (PAR)SF8276.9to $120 $9001581708ft
feet 2.0-3.0279.8 Cross Slope (PAR)SF68288.8to $120 $8,1001581718ft
feet 2.0-3.0306.3 Cross Slope (PAR)SF94318.8to $120 $11,2501581728ft
feet 2.0-3.0330.4 Cross Slope (PAR)SF53337.4to $120 $6,3001581738ft
feet 2.0-3.0344.8 Cross Slope (PAR)SF49351.3to $120 $5,8501581748ft
feet 5.0-6.0345.3 Running Slope REF18347.7to166621 8 ft
feet 2.0-3.0355.3 Cross Slope (PAR)SF38360.3to $120 $4,5001581758ft
feet 2.0-3.0363.2 Cross Slope (PAR)SF43368.9to $120 $5,1301581768ft
feet 4.0-5.0368.9 Cross Slope (PAR)SF16371.0to $120 $1,8901581778ft
feet 3.0-4.0373.8 Cross Slope (PAR)SF8374.8to $120 $9001581788ft
feet 2.0-3.0375.9 Cross Slope (PAR)SF71385.3to $120 $8,4601581798ft
feet 6.0-7.0381.3 Running Slope REF18383.7to166622 8 ft
feet 3.0-4.0390.1 Cross Slope (PAR)SF43395.8to $120 $5,1301581808ft
feet 2.0-3.0395.8 Cross Slope (PAR)SF164417.7to $120 $19,7101581818ft
feet 2.0-3.0441.6 Cross Slope (PAR)SF59449.4to $120 $7,0201581828ft
feet 3.0-4.0459.6 Cross Slope (PAR)SF8460.6to $120 $9001581838ft
feet 2.0-3.0461.3 Cross Slope (PAR)SF8462.3to $120 $9001581848ft
feet 3.0-4.0465.7 Cross Slope (PAR)SF9466.9to $120 $1,0801581858ft
feet 5.0-6.0473.3 Cross Slope (PAR)SF21476.1to $120 $2,5201581868ft
feet 2.0-3.0477.3 Cross Slope (PAR)SF49483.8to $120 $5,8501581878ft
feet 3.0-4.0486.8 Cross Slope (PAR)SF32491.0to $120 $3,7801581888ft
feet 4.0-5.0501.3 Cross Slope (PAR)SF29505.2to $120 $3,5101581898ft
feet 2.0-3.0505.2 Cross Slope (PAR)SF32509.5to $120 $3,8701581908ft
feet510.1 Driveway542.3to165960
feet 3.0-4.0544.4 Cross Slope (PAR)SF10545.7to $120 $1,1701581918ft
feet 2.0-3.0545.9 Cross Slope (PAR)SF13547.6to $120 $1,5301581928ft
feet 4.0-5.0550.3 Cross Slope (PAR)SF9551.5to $120 $1,0801581938ft
feet 3.0-4.0554.5 Cross Slope (PAR)SF11556.0to $120 $1,3501581948ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
739
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
E 26TH ST
End Street Name
2001160852
Run ID
E 26Th St
42.75
ID Sidewalk Width
Priority
feet 2.0-3.0560.9 Cross Slope (PAR)SF62569.2to $120 $7,4701581958ft
feet 2.0-3.0575.3 Cross Slope (PAR)SF73585.0to $120 $8,7301581968ft
feet 2.0-3.0590.9 Cross Slope (PAR)SF47597.1to $120 $5,5801581978ft
feet 2.0-3.0609.5 Cross Slope (PAR)SF25612.8to $120 $2,9701581988ft
feet 2.0-3.0616.5 Cross Slope (PAR)SF41621.9to $120 $4,8601581998ft
feet 2.0-3.0635.4 Cross Slope (PAR)SF44641.2to $120 $5,2201582008ft
feet644.3 Driveway680.3to165961
feet 3.06644.4 Vertical Change REF8645.4to138171 8 ft
feet .43662.0 Vertical Change REF8663.0to138172 8 ft
feet 2.0-3.0680.3 Cross Slope (Driveway)SF15682.3to $40 $6001582018ft
feet 3.0-4.0684.9 Cross Slope (PAR)SF8685.9to $120 $9001582028ft
feet 2.0-3.0687.1 Cross Slope (PAR)SF9688.3to $120 $1,0801582038ft
feet 2.0-3.0691.3 Cross Slope (PAR)SF11692.8to $120 $1,3501582048ft
feet .46702.1 Vertical Change LF8703.1to $75 $5631381738ft
feet 2.0-3.0704.0 Cross Slope (PAR)SF29707.8to $120 $3,4201582058ft
feet 4.0-5.0709.0 Cross Slope (PAR)SF29712.8to $120 $3,4201582068ft
feet 2.0-3.0715.1 Cross Slope (PAR)SF11716.6to $120 $1,3501582078ft
feet 2.0-3.0723.8 Cross Slope (PAR)SF8724.8to $120 $9001582088ft
feet 2.0-3.0730.3 Cross Slope (PAR)SF11731.8to $120 $1,3501582098ft
feet 2.0-3.0736.4 Cross Slope (PAR)SF65745.1to $120 $7,8301582108ft
feet 2.0-3.0773.1 Cross Slope (PAR)SF16775.2to $120 $1,8901582118ft
feet 2.0-3.0787.4 Cross Slope (PAR)SF23790.5to $120 $2,7901582128ft
feet 2.0-3.0794.3 Cross Slope (PAR)SF23797.3to $120 $2,7001582138ft
feet .55795.0 Vertical Change REF8796.0to138174 8 ft
feet 2.0-3.0800.6 Cross Slope (PAR)SF15802.6to $120 $1,8001582148ft
feet 2.0-3.0807.2 Cross Slope (PAR)SF31811.3to $120 $3,6901582158ft
feet 2.0-3.0859.9 Cross Slope (PAR)SF29863.8to $120 $3,5101582168ft
feet -.27866.7 Vertical Change REF8867.7to138175 8 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
740
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S INDIANA ST
Survey Street Name Starting Street Name
E 26TH ST
End Street Name
2001160852
Run ID
E 26Th St
42.75
ID Sidewalk Width
Priority
feet 2.0-3.0867.5 Cross Slope (PAR)SF10868.8to $120 $1,1701582178ft
feet 2.0-3.0875.8 Cross Slope (PAR)SF32880.1to $120 $3,8701582188ft
feet 2.0-3.0950.6 Cross Slope (PAR)SF41956.1to $120 $4,9501582198ft
feet 2.0-3.0962.3 Cross Slope (PAR)SF9963.5to $120 $1,0801582208ft
feet 3.0-4.0992.4 Cross Slope (PAR)SF17994.6to $120 $1,9801582218ft
feet 2.0-3.0995.6 Cross Slope (PAR)SF441001.5to $120 $5,3101582228ft
$343,477.50TOTAL COST FOR:E 26TH STSside of Starting at:S INDIANA ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
741
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911211524
Run ID
E 26Th St
45.5
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF344.4to $120 $4,0921417688ft
feet 4.0-5.04.4 Cross Slope (PAR)SF20931.4to $120 $25,1101417698ft
feet 2.0-3.033.3 Cross Slope (PAR)SF6641.8to $120 $7,9051417708ft
feet 2.0-3.044.2 Cross Slope (PAR)SF5351.1to $120 $6,4171417718ft
feet 3.0-4.057.5 Cross Slope (PAR)SF10871.4to $120 $12,9271417728ft
feet 2.0-3.072.1 Cross Slope (PAR)SF7882.2to $120 $9,3931417738ft
feet 6.0-7.084.4 Cross Slope (PAR)SF885.4to $120 $9301417748ft
feet 4.0-5.087.8 Cross Slope (PAR)SF1089.1to $120 $1,2091417758ft
feet .8688.6 Vertical Change REF889.6to133475 8 ft
feet 3.0-4.091.4 Cross Slope (PAR)SF1092.7to $120 $1,2091417768ft
feet 4.0-5.095.3 Cross Slope (PAR)SF53102.1to $120 $6,3241417778ft
feet 296.7 Vertical Change REF897.7to133476 8 ft
feet 2.0-3.0102.1 Cross Slope (PAR)SF40107.2to $120 $4,7431417788ft
$80,259.00TOTAL COST FOR:E 26TH STSside of Starting at:S SANTA FE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
742
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
2677 E 26TH ST
End Street Name
1912041602
Run ID
E 26Th St
89.5
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF244.7to $120 $2,8201606385ft
feet 3.482.3 Vertical Change SF53.3to $75 $3751389785ft
feet 4.0-5.04.7 Cross Slope (PAR)SF2710.2to $120 $3,3001606395ft
feet9.4 Continuous Width SF510.4to $120 $6001669845ft
feet 6.0-7.011.2 Cross Slope (PAR)SF1113.3to $120 $1,2601606405ft
feet 3.0-4.015.8 Cross Slope (PAR)SF817.3to $120 $9001606415ft
feet 2.0-3.026.8 Cross Slope (PAR)SF9746.1to $120 $11,5801606425ft
feet37.4 Continuous Width SF538.4to $120 $6001675825ft
feet 2.0-3.048.4 Cross Slope (PAR)SF6962.1to $120 $8,2201606435ft
feet50.6 Continuous Width SF551.6to $120 $6001676065ft
feet 3.0-4.064.8 Cross Slope (PAR)SF665.9to $120 $6601606445ft
feet 2.0-3.065.9 Cross Slope (PAR)SF1468.7to $120 $1,6801606455ft
feet 4.0-5.070.8 Cross Slope (PAR)SF1373.4to $120 $1,5601606465ft
feet 2.0-3.075.3 Cross Slope (PAR)SF3181.4to $120 $3,6601606475ft
feet 2.0-3.085.8 Cross Slope (PAR)SF2390.3to $120 $2,7001606485ft
feet 4.0-5.091.1 Cross Slope (PAR)SF115114.1to $120 $13,8001606495ft
feet97.9 Continuous Width REF598.9to167768 5 ft
feet 2.0-3.0114.1 Cross Slope (PAR)SF9115.8to $120 $1,0201606505ft
feet 2.0-3.0118.4 Cross Slope (PAR)SF6119.5to $120 $6601606515ft
feet 2.0-3.0123.3 Cross Slope (PAR)SF64136.0to $120 $7,6201606525ft
feet 3.0-4.0140.9 Cross Slope (PAR)SF7142.3to $120 $8401606535ft
feet145.8 Continuous Width REF5146.8to167769 5 ft
feet 2.0-3.0146.9 Cross Slope (PAR)SF44155.7to $120 $5,2801606545ft
feet155.7 Driveway186.4to166160
feet .39170.3 Vertical Change REF5171.3to138979 5 ft
feet 2.0-3.0186.4 Cross Slope (Driveway)SF51196.6to $40 $2,0401606555ft
feet197.9 Driveway226.7to166161
feet -.27215.9 Vertical Change REF5216.9to138980 5 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
743
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
2677 E 26TH ST
End Street Name
1912041602
Run ID
E 26Th St
89.5
ID Sidewalk Width
Priority
feet 6.0-7.0226.8 Cross Slope (Driveway)SF8228.3to $40 $3001606565ft
feet 5.0-6.0228.3 Cross Slope (PAR)SF32234.7to $120 $3,8401606575ft
feet 3.0-4.0235.3 Cross Slope (PAR)SF11237.5to $120 $1,3201606585ft
feet 3.0-4.0241.9 Cross Slope (PAR)SF12244.3to $120 $1,4401606595ft
feet 2.0-3.0244.3 Cross Slope (PAR)SF11246.4to $120 $1,2601606605ft
feet246.9 Continuous Width SF5247.9to $120 $6001670385ft
feet 2.0-3.0250.8 Cross Slope (PAR)SF83267.3to $120 $9,9001606615ft
feet264.8 Continuous Width SF5265.8to $120 $6001675475ft
feet 2.0-3.0269.9 Cross Slope (PAR)SF43278.5to $120 $5,1601606625ft
feet .37327.2 Vertical Change LF5328.2to $75 $3751389815ft
feet 2.0-3.0331.4 Cross Slope (PAR)SF11333.5to $120 $1,2601606635ft
feet 4.0-5.0334.1 Cross Slope (PAR)SF6335.3to $120 $7201606645ft
feet 2.0-3.0335.8 Cross Slope (PAR)SF7337.1to $120 $7801606655ft
feet 2.0-3.0352.8 Cross Slope (PAR)SF18356.3to $120 $2,1001606665ft
feet 2.0-3.0359.0 Cross Slope (PAR)SF138386.5to $120 $16,5001606675ft
feet371.0 Continuous Width SF5372.0to $120 $6001673775ft
feet 2.0-3.0389.6 Cross Slope (PAR)SF49399.4to $120 $5,8801606685ft
feet397.7 Continuous Width SF5398.7to $120 $6001670425ft
feet403.5 Driveway446.7to166162
feet 2.0-3.0446.7 Cross Slope (Driveway)SF6447.8to $40 $2201606695ft
feet455.1 Cold Patch 19458.8to140574 5 ft
feet .76457.5 Vertical Change SF5458.5to $75 $3751389825ft
feet458.8 Continuous Width REF5459.8to166905 5 ft
feet -.29528.2 Vertical Change LF5529.2to $75 $3751389835ft
feet 2.0-3.0542.8 Cross Slope (PAR)SF6544.0to $120 $7201606705ft
feet -.78545.4 Vertical Change SF5546.4to $75 $3751389845ft
feet .26579.9 Vertical Change LF5580.9to $75 $3751389855ft
feet -.36597.1 Vertical Change LF5598.1to $75 $3751389865ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
744
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
2677 E 26TH ST
End Street Name
1912041602
Run ID
E 26Th St
89.5
ID Sidewalk Width
Priority
feet 2.0-3.0683.8 Cross Slope (PAR)SF9685.5to $120 $1,0201606715ft
feet 2.0-3.0705.0 Cross Slope (PAR)SF79720.7to $120 $9,4201606725ft
feet 2.0-3.0731.4 Cross Slope (PAR)SF12733.7to $120 $1,3801606735ft
feet734.8 Cold Patch 47744.1to140575 5 ft
feet -.26735.4 Vertical Change LF5736.4to $75 $3751389875ft
feet 2.0-3.0744.1 Cross Slope (PAR)SF9745.9to $120 $1,0801606745ft
$141,100.00TOTAL COST FOR:E 26TH STNside of Starting at:S SOTO ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
745
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151510
Run ID
E 26Th St
80.75
ID Sidewalk Width
Priority
feet 2.0-3.01.5 Cross Slope (PAR)SF7515.8to $120 $9,0091543445ft
feet 4.0-5.017.1 Cross Slope (PAR)SF2021.0to $120 $2,4571543455ft
feet 2.0-3.023.3 Cross Slope (PAR)SF8439.3to $120 $10,0801543465ft
feet 2.0-3.041.7 Cross Slope (PAR)SF6954.8to $120 $8,2531543475ft
feet 2.0-3.061.8 Cross Slope (PAR)SF1564.6to $120 $1,7641543485ft
feet 3.0-4.076.0 Cross Slope (PAR)SF877.6to $120 $1,0081543495ft
feet 2.0-3.078.0 Cross Slope (PAR)SF3885.2to $120 $4,5361543505ft
feet 2.0-3.089.9 Cross Slope (PAR)SF1893.3to $120 $2,1421543515ft
feet 3.0-4.096.0 Cross Slope (PAR)SF597.0to $120 $6301543525ft
feet 2.0-3.097.3 Cross Slope (PAR)SF64109.4to $120 $7,6231543535ft
feet 2.0-3.0111.8 Cross Slope (PAR)SF7113.2to $120 $8821543545ft
feet 2.0-3.0115.4 Cross Slope (PAR)SF9117.1to $120 $1,0711543555ft
feet 2.0-3.0121.3 Cross Slope (PAR)SF12123.6to $120 $1,4491543565ft
feet 2.0-3.0127.6 Cross Slope (PAR)SF91145.0to $120 $10,9621543575ft
feet 7.0-8.0138.9 Running Slope REF9140.7to166513 5 ft
feet 4.0-5.0145.0 Cross Slope (PAR)SF6146.1to $120 $6931543585ft
feet146.3 Driveway201.2to165735
feet 4.0-5.0201.2 Cross Slope (Driveway)SF78216.0to $40 $3,1081543595ft
feet 2.0-3.0217.3 Cross Slope (PAR)SF8218.8to $120 $9451543605ft
feet 2.0-3.0221.2 Cross Slope (PAR)SF64233.3to $120 $7,6231543615ft
feet 3.0-4.0238.7 Cross Slope (PAR)SF6239.9to $120 $7561543625ft
feet 2.0-3.0240.9 Cross Slope (PAR)SF161271.5to $120 $19,2781543635ft
feet 2.0-3.0273.7 Cross Slope (PAR)SF37280.8to $120 $4,4731543645ft
feet 5.0-6.0285.2 Running Slope SF15288.0to $120 $1,7641665145ft
feet288.0 Driveway322.0to165736
feet 2.0-3.0322.0 Cross Slope (Driveway)SF7323.4to $40 $2941543655ft
feet 4.0-5.0333.3 Cross Slope (PAR)SF26338.2to $120 $3,0871543665ft
feet 2.0-3.0339.8 Cross Slope (PAR)SF123363.3to $120 $14,8051543675ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
746
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151510
Run ID
E 26Th St
80.75
ID Sidewalk Width
Priority
feet 4.0-5.0365.8 Cross Slope (PAR)SF20369.7to $120 $2,4571543685ft
feet 2.0-3.0370.1 Cross Slope (PAR)SF57381.0to $120 $6,8671543695ft
feet 4.0-5.0388.2 Cross Slope (PAR)SF7389.6to $120 $8821543705ft
feet 3.0-4.0394.6 Cross Slope (PAR)SF41402.5to $120 $4,9771543715ft
feet 2.0-3.0403.3 Cross Slope (PAR)SF26408.3to $120 $3,1501543725ft
feet 2.0-3.0411.7 Cross Slope (PAR)SF6412.9to $120 $7561543735ft
feet 2.0-3.0416.4 Cross Slope (PAR)SF54426.6to $120 $6,4261543745ft
feet 2.0-3.0429.8 Cross Slope (PAR)SF40437.4to $120 $4,7881543755ft
feet 4.0-5.0437.4 Cross Slope (PAR)SF15440.3to $120 $1,8271543765ft
feet 2.0-3.0443.0 Cross Slope (PAR)SF6444.2to $120 $7561543775ft
feet 4.0-5.0448.0 Cross Slope (PAR)SF14450.7to $120 $1,7011543785ft
feet450.7 Cold Patch 14453.3to140507 5 ft
feet 4.0-5.0453.3 Cross Slope (PAR)SF32459.4to $120 $3,8431543795ft
feet 3.0-4.0462.4 Cross Slope (PAR)SF8464.0to $120 $1,0081543805ft
feet 2.0-3.0468.8 Cross Slope (PAR)SF44477.1to $120 $5,2291543815ft
feet 5.0-6.0479.1 Cross Slope (PAR)SF17482.3to $120 $2,0161543825ft
feet 3.0-4.0482.9 Cross Slope (PAR)SF88499.6to $120 $10,5211543835ft
feet 3.0-4.0501.8 Cross Slope (PAR)SF45510.4to $120 $5,4181543845ft
feet 4.0-5.0515.6 Cross Slope (PAR)SF65528.0to $120 $7,8121543855ft
feet 2.0-3.0529.3 Cross Slope (PAR)SF9531.0to $120 $1,0711543865ft
feet 3.0-4.0533.1 Cross Slope (PAR)SF9534.8to $120 $1,0711543875ft
feet 2.0-3.0535.3 Cross Slope (PAR)SF5536.3to $120 $6301543885ft
feet .41538.7 Vertical Change LF5539.7to $75 $3941374705ft
feet 4.0-5.0540.1 Cross Slope (PAR)SF31546.0to $120 $3,7171543895ft
feet547.8 Driveway644.1to165737
feet .39603.2 Vertical Change REF5604.2to137471 5 ft
feet -.28604.9 Vertical Change REF5605.9to137472 5 ft
feet .3621.3 Vertical Change REF5622.3to137473 5 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
747
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151510
Run ID
E 26Th St
80.75
ID Sidewalk Width
Priority
feet 4.0-5.0644.1 Cross Slope (Driveway)SF98662.8to $40 $3,9271543905ft
feet647.0 Continuous Width SF5648.0to $120 $6301675435ft
feet658.2 Continuous Width REF5659.2to167332 5 ft
feet 2.0-3.0664.3 Cross Slope (PAR)SF8665.8to $120 $9451543915ft
feet 4.0-5.0667.4 Cross Slope (PAR)SF28672.8to $120 $3,4021543925ft
feet 2.0-3.0673.7 Cross Slope (PAR)SF8675.3to $120 $1,0081543935ft
feet676.3 Continuous Width REF5677.3to166855 5 ft
feet 2.0-3.0678.8 Cross Slope (PAR)SF13681.2to $120 $1,5121543945ft
feet 4.0-5.0681.3 Cross Slope (PAR)SF53691.3to $120 $6,3001543955ft
feet684.4 Continuous Width SF5685.4to $120 $6301675995ft
feet 2.0-3.0693.3 Cross Slope (PAR)SF35700.0to $120 $4,2211543965ft
feet 2.0-3.0705.1 Cross Slope (PAR)SF17708.4to $120 $2,0791543975ft
feet 2.0-3.0719.2 Cross Slope (PAR)SF28724.6to $120 $3,4021543985ft
feet 4.0-5.0726.3 Cross Slope (PAR)SF27731.5to $120 $3,2761543995ft
feet 2.0-3.0732.7 Cross Slope (PAR)SF19736.3to $120 $2,2681544005ft
feet 2.0-3.0738.8 Cross Slope (PAR)SF60750.3to $120 $7,2451544015ft
feet 3.0-4.0755.7 Cross Slope (PAR)SF23760.0to $120 $2,7091544025ft
feet 2.0-3.0760.0 Cross Slope (PAR)SF23764.3to $120 $2,7091544035ft
feet 3.0-4.0767.3 Cross Slope (PAR)SF34773.7to $120 $4,0321544045ft
feet 3.0-4.0777.7 Cross Slope (PAR)SF31783.6to $120 $3,7171544055ft
feet 2.0-3.0783.8 Cross Slope (PAR)SF69796.9to $120 $8,2531544065ft
feet790.8 Continuous Width SF5791.8to $120 $6301676575ft
feet 3.0-4.0799.0 Cross Slope (PAR)SF35805.6to $120 $4,1581544075ft
feet 2.0-3.0806.6 Cross Slope (PAR)SF32812.7to $120 $3,8431544085ft
feet 3.0-4.0816.3 Cross Slope (PAR)SF16819.4to $120 $1,9531544095ft
feet 2.0-3.0820.8 Cross Slope (PAR)SF59832.1to $120 $7,1191544105ft
feet 2.0-3.0834.3 Cross Slope (PAR)SF247881.4to $120 $29,6731544115ft
feet 4.0-5.0882.3 Cross Slope (PAR)SF23886.7to $120 $2,7721544125ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
748
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151510
Run ID
E 26Th St
80.75
ID Sidewalk Width
Priority
feet 2.0-3.0888.1 Cross Slope (PAR)SF38895.3to $120 $4,5361544135ft
feet890.1 Continuous Width SF5891.1to $120 $6301676585ft
feet 4.0-5.0896.2 Cross Slope (PAR)SF27901.4to $120 $3,2761544145ft
feet 3.0-4.0903.8 Cross Slope (PAR)SF11905.9to $120 $1,3231544155ft
feet906.8 Driveway941.8to165738
feet .3911.0 Vertical Change REF5912.0to137474 5 ft
feet 3.0-4.0942.8 Cross Slope (PAR)SF8944.4to $120 $1,0081544165ft
feet 2.0-3.0945.6 Cross Slope (PAR)SF29951.2to $120 $3,5281544175ft
feet946.8 Continuous Width REF5947.8to166883 5 ft
feet952.0 Driveway988.3to165739
feet 3.0-4.0988.3 Cross Slope (Driveway)SF11990.4to $40 $4411544185ft
feet 3.3991.1 Vertical Change REF5992.1to137475 5 ft
feet 2.0-3.0991.6 Cross Slope (PAR)SF14994.2to $120 $1,6381544195ft
feet 2.0-3.01003.4 Cross Slope (PAR)SF351010.1to $120 $4,2211544205ft
feet1008.3 Continuous Width REF51009.3to167340 5 ft
feet 2.0-3.01021.7 Cross Slope (PAR)SF221025.9to $120 $2,6461544215ft
feet 2.0-3.01030.8 Cross Slope (PAR)SF61032.0to $120 $7561544225ft
feet 2.0-3.01041.9 Cross Slope (PAR)SF111044.0to $120 $1,3231544235ft
feet 2.0-3.01049.1 Cross Slope (PAR)SF121051.3to $120 $1,3861544245ft
feet 4.0-5.01051.3 Cross Slope (PAR)SF591062.6to $120 $7,1191544255ft
feet 3.0-4.01064.8 Cross Slope (PAR)SF201068.7to $120 $2,4571544265ft
feet 2.0-3.01070.8 Cross Slope (PAR)SF561081.4to $120 $6,6781544275ft
feet 4.0-5.01082.6 Cross Slope (PAR)SF161085.7to $120 $1,9531544285ft
feet 2.0-3.01090.0 Cross Slope (PAR)SF161093.0to $120 $1,8901544295ft
feet 2.0-3.01106.6 Cross Slope (PAR)SF61107.7to $120 $6931544305ft
feet 3.0-4.01110.3 Cross Slope (PAR)SF91112.1to $120 $1,1341544315ft
feet 2.0-3.01117.0 Cross Slope (PAR)SF131119.4to $120 $1,5121544325ft
feet 2.0-3.01122.2 Cross Slope (PAR)SF191125.8to $120 $2,2681544335ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
749
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
S SOTO ST
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151510
Run ID
E 26Th St
80.75
ID Sidewalk Width
Priority
feet 3.0-4.01127.9 Cross Slope (PAR)SF271133.1to $120 $3,2761544345ft
feet 2.0-3.01133.4 Cross Slope (PAR)SF151136.3to $120 $1,8271544355ft
feet 3.0-4.01138.9 Cross Slope (PAR)SF561149.6to $120 $6,7411544365ft
feet 5.0-6.01147.6 Running Slope REF91149.3to166515 5 ft
$372,681.75TOTAL COST FOR:E 26TH STSside of Starting at:S SOTO ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
750
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151423
Run ID
E 26Th St
79
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF102.4to $120 $1,1521546704ft
feet 2.0-3.03.1 Cross Slope (PAR)SF5416.6to $120 $6,4801546714ft
feet 2.0-3.018.8 Cross Slope (PAR)SF6234.3to $120 $7,4401546724ft
feet 2.0-3.038.2 Cross Slope (PAR)SF1140.9to $120 $1,2961546734ft
feet 2.0-3.043.4 Cross Slope (PAR)SF6258.9to $120 $7,4401546744ft
feet 2.0-3.079.8 Cross Slope (PAR)SF1683.7to $120 $1,8721546754ft
feet 2.0-3.094.0 Cross Slope (PAR)SF41104.3to $120 $4,9441546764ft
feet111.9 Cold Patch 15115.7to140511 4 ft
feet 4.0-5.0122.6 Cross Slope (PAR)SF10125.1to $120 $1,2001546774ft
feet 4.0-5.0128.9 Cross Slope (PAR)SF39138.7to $120 $4,7041546784ft
feet134.3 Continuous Width SF4135.3to $120 $4801670844ft
feet .27136.0 Vertical Change LF4137.0to $75 $3001375314ft
feet -.3139.5 Vertical Change LF4140.5to $75 $3001375324ft
feet140.7 Cold Patch 5142.0to140512 4 ft
feet140.7 Cold Patch 665306.9to140513 4 ft
feet142.1 Continuous Width SF4143.1to $120 $4801673824ft
feet 2.0-3.0143.8 Cross Slope (PAR)SF28150.8to $120 $3,3601546794ft
feet 4.0-5.0152.7 Cross Slope (PAR)SF14156.3to $120 $1,7281546804ft
feet 2.0-3.0156.7 Cross Slope (PAR)SF4157.8to $120 $5281546814ft
feet 2.0-3.0163.7 Cross Slope (PAR)SF33172.0to $120 $3,9841546824ft
feet 3.0-4.0174.9 Cross Slope (PAR)SF10177.4to $120 $1,2001546834ft
feet 2.15177.9 Vertical Change SF4178.9to $75 $3001375334ft
feet 3.0-4.0180.3 Cross Slope (PAR)SF28187.3to $120 $3,3601546844ft
feet 2.0-3.0188.3 Cross Slope (PAR)SF5189.6to $120 $6241546854ft
feet 3.0-4.0191.9 Cross Slope (PAR)SF8193.8to $120 $9121546864ft
feet 3.0-4.0196.0 Cross Slope (PAR)SF15199.8to $120 $1,8241546874ft
feet 5.0-6.0204.9 Cross Slope (PAR)SF5206.2to $120 $6241546884ft
feet -.39209.7 Vertical Change LF4210.7to $75 $3001375344ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
751
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151423
Run ID
E 26Th St
79
ID Sidewalk Width
Priority
feet 3.0-4.0212.8 Cross Slope (PAR)SF14216.4to $120 $1,7281546894ft
feet 5.0-6.0216.4 Cross Slope (PAR)SF4217.5to $120 $5281546904ft
feet 6.0-7.0217.5 Cross Slope (PAR)SF17221.8to $120 $2,0641546914ft
feet .29217.9 Vertical Change REF4218.9to137535 4 ft
feet 5.0-6.0222.8 Cross Slope (PAR)SF4223.8to $120 $4801546924ft
feet 6.0-7.0224.0 Cross Slope (PAR)SF19228.7to $120 $2,2561546934ft
feet 5.0-6.0232.4 Cross Slope (PAR)SF4233.5to $120 $5281546944ft
feet 5.0-6.0237.7 Cross Slope (PAR)SF18242.3to $120 $2,2081546954ft
feet 4.0-5.0244.6 Cross Slope (PAR)SF49256.8to $120 $5,8561546964ft
feet245.4 Continuous Width SF4246.4to $120 $4801674274ft
feet -.37249.4 Vertical Change REF4250.4to137536 4 ft
feet 3.0-4.0260.2 Cross Slope (PAR)SF28267.3to $120 $3,4081546974ft
feet 4.0-5.0270.3 Cross Slope (PAR)SF16274.4to $120 $1,9681546984ft
feet 3.0-4.0278.5 Cross Slope (PAR)SF10280.9to $120 $1,1521546994ft
feet280.1 Continuous Width SF4281.1to $120 $4801669334ft
feet 4.0-5.0285.3 Cross Slope (PAR)SF4286.4to $120 $5281547004ft
feet 3.0-4.0290.0 Cross Slope (PAR)SF4291.0to $120 $4801547014ft
$80,976.00TOTAL COST FOR:E 26TH STNEside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
752
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
HARRIET ST
End Street Name
1911211543
Run ID
E 26Th St
71.25
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF71.5to $120 $8551417045ft
feet35.3 Continuous Width REF536.3to166867 5 ft
feet 2.0-3.044.3 Cross Slope (PAR)SF1246.9to $120 $1,4821417055ft
feet 3.0-4.049.2 Cross Slope (PAR)SF1051.2to $120 $1,1401417065ft
feet 2.0-3.058.7 Cross Slope (PAR)SF1261.3to $120 $1,4821417075ft
feet 3.0-4.063.8 Cross Slope (PAR)SF665.1to $120 $7411417085ft
feet 2.0-3.065.4 Cross Slope (PAR)SF566.4to $120 $5701417095ft
feet .9265.7 Vertical Change REF566.7to133447 5 ft
feet 2.0-3.084.2 Cross Slope (PAR)SF112107.8to $120 $13,4521417105ft
feet 4.0-5.0107.8 Cross Slope (PAR)SF19111.8to $120 $2,2801417115ft
feet 2.0-3.0111.8 Cross Slope (PAR)SF19115.8to $120 $2,2801417125ft
feet 4.0-5.0115.8 Cross Slope (PAR)SF39124.0to $120 $4,6741417135ft
feet 2.0-3.0124.0 Cross Slope (PAR)SF44133.2to $120 $5,2441417145ft
feet 2129.2 Vertical Change REF5130.2to133448 5 ft
feet 4.0-5.0135.8 Cross Slope (PAR)SF109158.8to $120 $13,1101417155ft
feet 2.0-3.0159.2 Cross Slope (PAR)SF83176.6to $120 $9,9181417165ft
feet 3.19162.5 Vertical Change REF5163.5to133449 5 ft
feet 3.05168.6 Vertical Change REF5169.6to133450 5 ft
feet 4.0-5.0179.6 Cross Slope (PAR)SF10181.8to $120 $1,2541417175ft
feet 2.0-3.0182.7 Cross Slope (PAR)SF101204.0to $120 $12,1411417185ft
feet 2.0-3.0206.1 Cross Slope (PAR)SF65219.8to $120 $7,8091417195ft
feet 4.0-5.0220.5 Cross Slope (PAR)SF78237.0to $120 $9,4051417205ft
feet 2.0-3.0237.0 Cross Slope (PAR)SF23241.9to $120 $2,7931417215ft
feet 4.0-5.0241.9 Cross Slope (PAR)SF29248.1to $120 $3,5341417225ft
feet248.1 Driveway279.8to164560
feet 2.0-3.0281.3 Cross Slope (PAR)SF18285.1to $120 $2,1661417235ft
feet 2.0-3.0288.8 Cross Slope (PAR)SF39297.1to $120 $4,7311417245ft
feet 2.0-3.0299.7 Cross Slope (PAR)SF19303.7to $120 $2,2801417255ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
753
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
HARRIET ST
End Street Name
1911211543
Run ID
E 26Th St
71.25
ID Sidewalk Width
Priority
feet 2.0-3.0308.3 Cross Slope (PAR)SF64321.8to $120 $7,6951417265ft
feet 4.0-5.0321.8 Cross Slope (PAR)SF31328.4to $120 $3,7621417275ft
feet -.33328.0 Vertical Change REF5329.0to133452 5 ft
feet 2.0-3.0328.7 Cross Slope (PAR)SF41337.3to $120 $4,9021417285ft
feet 2.0-3.0339.9 Cross Slope (PAR)SF184378.7to $120 $22,1161417295ft
feet .78361.5 Vertical Change REF5362.5to133453 5 ft
feet 2.0-3.0382.6 Cross Slope (PAR)SF167417.7to $120 $20,0071417305ft
feet .28397.4 Vertical Change REF5398.4to133454 5 ft
feet 2.0-3.0433.7 Cross Slope (PAR)SF45443.2to $120 $5,4151417315ft
feet .76445.3 Vertical Change REF5446.3to133455 5 ft
feet 3.0-4.0446.0 Cross Slope (PAR)SF9447.8to $120 $1,0261417325ft
feet 3.0-4.0451.5 Cross Slope (PAR)SF24456.6to $120 $2,9071417335ft
feet 2.0-3.0456.6 Cross Slope (PAR)SF5457.7to $120 $6271417345ft
feet 2.0-3.0465.1 Cross Slope (PAR)SF114489.0to $120 $13,6231417355ft
feet .88480.3 Vertical Change REF5481.3to133456 5 ft
feet 2.0-3.0493.8 Cross Slope (PAR)SF9495.6to $120 $1,0261417365ft
feet 3.0-4.0498.3 Cross Slope (PAR)SF7499.7to $120 $7981417375ft
feet 5.0-6.0500.0 Running Slope SF14503.0to $120 $1,7101664195ft
feet 14.0-15.0504.2 Cross Slope (PAR)SF33511.2to $120 $3,9901417385ft
feet511.5 Driveway529.0to164561
feet511.5 Driveway539.2to164562
feet 3.21530.0 Vertical Change REF5531.0to133457 5 ft
feet 4.0-5.0531.2 Cross Slope (Driveway)SF17534.8to $40 $6841417395ft
feet 2.0-3.0535.7 Cross Slope (Driveway)SF17539.2to $40 $6651417405ft
$194,294.00TOTAL COST FOR:E 26TH STSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
754
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3770 E 26TH ST
End Street Name
2001161539
Run ID
E 26Th St
65.25
ID Sidewalk Width
Priority
feet 3.0-4.00.5 Cross Slope (PAR)SF172.7to $120 $1,9801563918ft
feet 4.0-5.07.3 Cross Slope (PAR)SF149.1to $120 $1,6201563928ft
feet 2.0-3.023.8 Cross Slope (PAR)SF2126.6to $120 $2,5201563938ft
feet 4.0-5.029.3 Cross Slope (PAR)SF2732.9to $120 $3,2401563948ft
feet 2.0-3.033.1 Cross Slope (PAR)SF1134.5to $120 $1,2601563958ft
feet 7.0-8.034.7 Running Slope SF1536.7to $120 $1,8001665558ft
feet 3.0-4.039.4 Cross Slope (PAR)SF2242.3to $120 $2,6101563968ft
feet 2.0-3.044.6 Cross Slope (PAR)SF2047.2to $120 $2,3401563978ft
feet 4.0-5.048.5 Cross Slope (PAR)SF2952.3to $120 $3,4201563988ft
feet 2.0-3.052.5 Cross Slope (PAR)SF4057.8to $120 $4,7701563998ft
feet 4.0-5.058.3 Cross Slope (PAR)SF6266.6to $120 $7,4701564008ft
feet 2.0-3.066.9 Cross Slope (PAR)SF1568.9to $120 $1,8001564018ft
feet 2.0-3.075.7 Cross Slope (PAR)SF876.8to $120 $9901564028ft
feet 4.0-5.078.2 Cross Slope (PAR)SF5986.1to $120 $7,1101564038ft
feet 2.0-3.088.4 Cross Slope (PAR)SF1390.1to $120 $1,5301564048ft
feet 2.0-3.097.6 Cross Slope (PAR)SF29101.5to $120 $3,5101564058ft
feet 3.0-4.0104.0 Cross Slope (PAR)SF13105.7to $120 $1,5301564068ft
feet 5.0-6.0104.2 Running Slope REF11105.6to166556 8 ft
feet 2.0-3.0105.7 Cross Slope (PAR)SF33110.1to $120 $3,9601564078ft
feet107.9 Continuous Width REF8108.9to167809 8 ft
feet 2.0-3.0113.3 Cross Slope (PAR)SF20115.9to $120 $2,3401564088ft
feet 2.0-3.0119.3 Cross Slope (PAR)SF70128.7to $120 $8,4601564098ft
feet 3.0-4.0134.8 Cross Slope (PAR)SF15136.8to $120 $1,8001564108ft
feet 4.0-5.0142.8 Cross Slope (PAR)SF30146.8to $120 $3,6001564118ft
feet 2.0-3.0147.6 Cross Slope (PAR)SF59155.5to $120 $7,1101564128ft
feet 4.0-5.0155.5 Cross Slope (PAR)SF9156.7to $120 $1,0801564138ft
feet 3.0-4.0161.6 Cross Slope (PAR)SF47167.8to $120 $5,5801564148ft
feet 4.0-5.0171.6 Cross Slope (PAR)SF50178.3to $120 $6,0301564158ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
755
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3770 E 26TH ST
End Street Name
2001161539
Run ID
E 26Th St
65.25
ID Sidewalk Width
Priority
feet 3.0-4.0180.4 Cross Slope (PAR)SF18182.8to $120 $2,1601564168ft
feet 3.0-4.0186.0 Cross Slope (PAR)SF15188.0to $120 $1,8001564178ft
feet 4.0-5.0191.6 Cross Slope (PAR)SF75201.6to $120 $9,0001564188ft
feet 2.0-3.0201.6 Cross Slope (PAR)SF61209.7to $120 $7,2901564198ft
feet 4.0-5.0213.2 Cross Slope (PAR)SF37218.1to $120 $4,4101564208ft
feet 4.0-5.0220.7 Cross Slope (PAR)SF23223.8to $120 $2,7901564218ft
feet 2.0-3.0224.3 Cross Slope (PAR)SF20227.0to $120 $2,4301564228ft
feet 3.0-4.0233.2 Cross Slope (PAR)SF167255.5to $120 $20,0701564238ft
feet -.4255.0 Vertical Change REF8256.0to137857 8 ft
feet 3.0-4.0257.8 Cross Slope (PAR)SF204285.0to $120 $24,4801564248ft
feet 3.0-4.0288.6 Cross Slope (PAR)SF120304.6to $120 $14,4001564258ft
feet 4.0-5.0307.7 Cross Slope (PAR)SF43313.4to $120 $5,1301564268ft
feet 2.0-3.0313.7 Cross Slope (PAR)SF44319.6to $120 $5,3101564278ft
feet 3.0-4.0322.3 Cross Slope (PAR)SF11323.8to $120 $1,3501564288ft
feet 2.0-3.0324.1 Cross Slope (PAR)SF43329.8to $120 $5,1301564298ft
feet 4.0-5.0331.3 Cross Slope (PAR)SF9332.5to $120 $1,0801564308ft
feet 4.0-5.0335.3 Cross Slope (PAR)SF31339.4to $120 $3,6901564318ft
feet 4.0-5.0341.8 Cross Slope (PAR)SF88353.5to $120 $10,5301564328ft
feet 2.0-3.0353.5 Cross Slope (PAR)SF29357.4to $120 $3,5101564338ft
feet 4.0-5.0359.3 Cross Slope (PAR)SF42364.9to $120 $5,0401564348ft
feet 3.0-4.0370.3 Cross Slope (PAR)SF11371.8to $120 $1,3501564358ft
feet 5.0-6.0373.4 Cross Slope (PAR)SF29377.2to $120 $3,4201564368ft
feet 3.36377.6 Vertical Change SF8378.6to $75 $5631378588ft
feet 4.0-5.0379.3 Cross Slope (PAR)SF67388.2to $120 $8,0101564378ft
feet 2.0-3.0389.8 Cross Slope (PAR)SF17392.1to $120 $2,0701564388ft
feet 4.0-5.0393.6 Cross Slope (PAR)SF60401.6to $120 $7,2001564398ft
feet 2.0-3.0401.6 Cross Slope (PAR)SF34406.1to $120 $4,0501564408ft
feet406.6 Driveway458.4to165868
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
756
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3770 E 26TH ST
End Street Name
2001161539
Run ID
E 26Th St
65.25
ID Sidewalk Width
Priority
feet .26440.8 Vertical Change REF8441.8to137859 8 ft
feet 3.0-4.0459.7 Cross Slope (PAR)SF11461.2to $120 $1,3501564418ft
feet 2.0-3.0462.4 Cross Slope (PAR)SF32466.7to $120 $3,8701564428ft
feet468.2 Driveway495.4to165869
feet -.41486.3 Vertical Change REF8487.3to137860 8 ft
feet 3.0-4.0499.3 Cross Slope (PAR)SF124515.8to $120 $14,8501564438ft
feet 3.0-4.0522.8 Cross Slope (PAR)SF36527.6to $120 $4,3201564448ft
feet 2.0-3.0531.2 Cross Slope (PAR)SF16533.3to $120 $1,8901564458ft
feet 4.0-5.0534.8 Cross Slope (PAR)SF32539.1to $120 $3,8701564468ft
feet 2.0-3.0540.2 Cross Slope (PAR)SF44546.1to $120 $5,3101564478ft
feet .42542.6 Vertical Change REF8543.6to137861 8 ft
feet 2.0-3.0548.3 Cross Slope (PAR)SF32552.6to $120 $3,8701564488ft
feet 3.0-4.0555.2 Cross Slope (PAR)SF14557.1to $120 $1,7101564498ft
feet 2.0-3.0557.1 Cross Slope (PAR)SF43562.8to $120 $5,1301564508ft
feet 2.0-3.0569.7 Cross Slope (PAR)SF95582.4to $120 $11,4301564518ft
feet 4.0-5.0582.6 Cross Slope (PAR)SF65591.3to $120 $7,8301564528ft
feet 2.0-3.0591.3 Cross Slope (PAR)SF53598.3to $120 $6,3001564538ft
feet .34599.1 Vertical Change LF8600.1to $75 $5631378628ft
feet 2.0-3.0602.4 Cross Slope (PAR)SF143621.4to $120 $17,1001564548ft
feet -.34616.3 Vertical Change REF8617.3to137863 8 ft
feet 2.0-3.0632.8 Cross Slope (PAR)SF43638.5to $120 $5,1301564558ft
feet640.3 Driveway663.9to165870
feet 3.0-4.0671.2 Cross Slope (PAR)SF12672.8to $120 $1,4401564568ft
feet 2.0-3.0673.2 Cross Slope (PAR)SF10674.5to $120 $1,1701564578ft
feet 3.0-4.0679.3 Cross Slope (PAR)SF12680.9to $120 $1,4401564588ft
feet 2.0-3.0680.9 Cross Slope (PAR)SF33685.3to $120 $3,9601564598ft
feet685.3 Driveway703.7to165871
feet 3.0-4.0704.9 Cross Slope (PAR)SF62713.2to $120 $7,4701564608ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
757
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3770 E 26TH ST
End Street Name
2001161539
Run ID
E 26Th St
65.25
ID Sidewalk Width
Priority
feet 5.0-6.0713.2 Cross Slope (PAR)SF16715.3to $120 $1,8901564618ft
feet 6.0-7.0716.0 Cross Slope (PAR)SF10717.3to $120 $1,1701564628ft
feet 5.0-6.0717.5 Cross Slope (PAR)SF76727.6to $120 $9,0901564638ft
feet 5.0-6.0727.2 Running Slope REF8728.3to166557 8 ft
feet 6.0-7.0728.1 Cross Slope (PAR)SF17730.3to $120 $1,9801564648ft
feet730.8 Driveway773.8to165872
feet -.27735.2 Vertical Change REF8736.2to137864 8 ft
feet -.29773.1 Vertical Change REF8774.1to137865 8 ft
feet 2.0-3.0777.0 Cross Slope (PAR)SF74786.9to $120 $8,9101564658ft
feet 2.0-3.0790.0 Cross Slope (PAR)SF16792.1to $120 $1,8901564668ft
feet 3.0-4.0794.3 Cross Slope (PAR)SF21797.1to $120 $2,5201564678ft
feet 2.0-3.0797.1 Cross Slope (PAR)SF275833.8to $120 $33,0301564688ft
feet .3803.2 Vertical Change REF8804.2to137866 8 ft
feet 4.0-5.0836.2 Cross Slope (PAR)SF21839.0to $120 $2,5201564698ft
feet 2.0-3.0839.6 Cross Slope (PAR)SF59847.5to $120 $7,1101564708ft
feet 3.0-4.0849.7 Cross Slope (PAR)SF132867.3to $120 $15,8401564718ft
feet 5.0-6.0867.3 Cross Slope (PAR)SF42872.9to $120 $5,0401564728ft
feet 4.0-5.0875.3 Cross Slope (PAR)SF71884.8to $120 $8,5501564738ft
feet 2.0-3.0884.8 Cross Slope (PAR)SF19887.3to $120 $2,2501564748ft
feet 4.0-5.0888.2 Cross Slope (PAR)SF8889.2to $120 $9001564758ft
feet889.6 Driveway940.1to165873
feet 2.0-3.0942.0 Cross Slope (PAR)SF38947.0to $120 $4,5001564768ft
feet 3.0-4.0950.4 Cross Slope (PAR)SF76960.5to $120 $9,0901564778ft
feet 2.0-3.0968.1 Cross Slope (PAR)SF31972.2to $120 $3,6901564788ft
feet 2.0-3.0974.3 Cross Slope (PAR)SF23977.4to $120 $2,7901564798ft
feet 3.0-4.0986.0 Cross Slope (PAR)SF18988.4to $120 $2,1601564808ft
feet990.2 Driveway1018.6to165874
feet 3.0-4.01019.3 Cross Slope (Driveway)SF1501039.3to $40 $6,0001564818ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
758
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
3770 E 26TH ST
End Street Name
2001161539
Run ID
E 26Th St
65.25
ID Sidewalk Width
Priority
feet .551027.0 Vertical Change REF81028.0to137868 8 ft
feet -.391042.8 Vertical Change LF81043.8to $75 $5631378698ft
feet1042.8 Driveway1071.5to165875
feet1042.8 Driveway1093.2to165876
feet -.261070.3 Vertical Change REF81071.3to137870 8 ft
feet 2.0-3.01072.8 Cross Slope (Driveway)SF411078.2to $40 $1,6201564828ft
feet 3.0-4.01081.7 Cross Slope (Driveway)SF461087.8to $40 $1,8301564838ft
feet 2.0-3.01087.8 Cross Slope (Driveway)SF341092.3to $40 $1,3501564848ft
feet 5.0-6.01091.4 Running Slope REF81092.4to166558 8 ft
$492,007.50TOTAL COST FOR:E 26TH STSside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
759
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151330
Run ID
E 26Th St
88.25
ID Sidewalk Width
Priority
feet .60.3 Vertical Change REF51.3to137561 5 ft
feet 3.0-4.00.5 Cross Slope (PAR)SF235.0to $120 $2,7001548515ft
feet5.6 Continuous Width SF56.6to $120 $6001676595ft
feet 2.0-3.06.0 Cross Slope (PAR)SF2511.0to $120 $3,0001548525ft
feet 2.0-3.014.7 Cross Slope (PAR)SF8932.4to $120 $10,6201548535ft
feet .9727.5 Vertical Change REF528.5to137562 5 ft
feet .2631.7 Vertical Change REF532.7to137563 5 ft
feet 4.0-5.032.4 Cross Slope (PAR)SF833.9to $120 $9001548545ft
feet 3.0-4.036.3 Cross Slope (PAR)SF3543.2to $120 $4,1401548555ft
feet 1.3441.8 Vertical Change REF542.8to137564 5 ft
feet 3.0-4.046.0 Cross Slope (PAR)SF1148.1to $120 $1,2601548565ft
feet 2.0-3.049.0 Cross Slope (PAR)SF12072.9to $120 $14,3401548575ft
feet56.7 Continuous Width REF557.7to167233 5 ft
feet .4261.4 Vertical Change REF562.4to137565 5 ft
feet73.6 Cold Patch 6085.5to140524 5 ft
feet 1.6579.8 Vertical Change SF580.8to $75 $3751375665ft
feet 2.0-3.087.9 Cross Slope (PAR)SF3995.7to $120 $4,6801548585ft
feet 3.295.5 Vertical Change REF596.5to137567 5 ft
feet96.5 Continuous Width REF597.5to167709 5 ft
feet 2.0-3.0101.1 Cross Slope (PAR)SF5102.1to $120 $6001548595ft
feet 2.02101.6 Vertical Change REF5102.6to137568 5 ft
feet 4.0-5.0103.0 Cross Slope (PAR)SF20107.0to $120 $2,4001548605ft
feet 2.0-3.0108.8 Cross Slope (PAR)SF9110.5to $120 $1,0201548615ft
feet 4.0-5.0112.8 Cross Slope (PAR)SF6113.9to $120 $6601548625ft
feet 2.0-3.0116.4 Cross Slope (PAR)SF42124.8to $120 $5,0401548635ft
feet 4.0-5.0125.1 Cross Slope (PAR)SF20129.1to $120 $2,4001548645ft
feet 3.0-4.0132.8 Cross Slope (PAR)SF8134.3to $120 $9001548655ft
feet 2.0-3.0135.0 Cross Slope (PAR)SF33141.5to $120 $3,9001548665ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
760
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151330
Run ID
E 26Th St
88.25
ID Sidewalk Width
Priority
feet 4.0-5.0141.5 Cross Slope (PAR)SF16144.7to $120 $1,9201548675ft
feet 6.0-7.0144.7 Cross Slope (PAR)SF5145.7to $120 $6001548685ft
feet 5.0-6.0145.7 Cross Slope (PAR)SF61157.8to $120 $7,2601548695ft
feet 3.0-4.0158.8 Cross Slope (PAR)SF11161.1to $120 $1,3801548705ft
feet 2.0-3.0161.8 Cross Slope (PAR)SF15164.8to $120 $1,8001548715ft
feet 3.0-4.0166.9 Cross Slope (PAR)SF61179.1to $120 $7,3201548725ft
feet 5.0-6.0179.3 Cross Slope (PAR)SF8180.8to $120 $9001548735ft
feet 3.0-4.0184.5 Cross Slope (PAR)SF7185.8to $120 $7801548745ft
feet 2.0-3.0185.8 Cross Slope (PAR)SF32192.1to $120 $3,7801548755ft
feet 4.0-5.0192.6 Cross Slope (PAR)SF56203.8to $120 $6,7201548765ft
feet 1.29193.4 Vertical Change REF5194.4to137569 5 ft
feet 2.0-3.0208.4 Cross Slope (PAR)SF11210.5to $120 $1,2601548775ft
feet 5.0-6.0210.6 Running Slope SF6211.7to $120 $6601665225ft
feet213.7 Continuous Width SF5214.7to $120 $6001676605ft
feet .54216.8 Vertical Change SF5217.8to $75 $3751375705ft
feet217.3 Driveway240.7to165775
feet 2.0-3.0240.7 Cross Slope (Driveway)SF24245.5to $40 $9601548785ft
feet 5.0-6.0265.9 Cross Slope (PAR)SF12268.2to $120 $1,3801548795ft
feet268.7 Driveway303.6to165776
feet268.7 Driveway491.4to165777
feet .28291.2 Vertical Change REF5292.2to137571 5 ft
feet .31294.6 Vertical Change REF5295.6to137572 5 ft
feet 5.0-6.0306.3 Cross Slope (Driveway)SF26311.5to $40 $1,0401548805ft
feet 5.0-6.0316.8 Cross Slope (Driveway)SF5317.9to $40 $2201548815ft
feet 6.0-7.0317.9 Cross Slope (Driveway)SF6319.0to $40 $2201548825ft
feet 4.0-5.0320.1 Cross Slope (Driveway)SF6321.4to $40 $2601548835ft
feet 3.0-4.0325.1 Cross Slope (Driveway)SF52335.6to $40 $2,1001548845ft
feet 4.0-5.0337.8 Cross Slope (Driveway)SF22342.1to $40 $8601548855ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
761
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
SIERRA PINE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151330
Run ID
E 26Th St
88.25
ID Sidewalk Width
Priority
feet 6.0-7.0342.1 Cross Slope (Driveway)SF12344.4to $40 $4601548865ft
feet 5.0-6.0344.4 Cross Slope (Driveway)SF22348.7to $40 $8601548875ft
feet .27345.6 Vertical Change REF5346.6to137573 5 ft
feet 5.0-6.0351.5 Cross Slope (Driveway)SF24356.3to $40 $9601548885ft
feet 3.0-4.0356.9 Cross Slope (Driveway)SF14359.6to $40 $5401548895ft
feet 2.0-3.0359.6 Cross Slope (Driveway)SF49369.3to $40 $1,9401548905ft
feet 3.0-4.0373.5 Cross Slope (Driveway)SF6374.7to $40 $2401548915ft
feet 2.0-3.0375.3 Cross Slope (Driveway)SF76390.5to $40 $3,0401548925ft
feet 4.0-5.0390.5 Cross Slope (Driveway)SF49400.3to $40 $1,9601548935ft
feet 2.0-3.0407.0 Cross Slope (Driveway)SF225451.9to $40 $8,9801548945ft
feet 2.0-3.0455.8 Cross Slope (Driveway)SF18459.3to $40 $7001548955ft
feet 3.0-4.0462.0 Cross Slope (Driveway)SF21466.2to $40 $8401548965ft
feet 4.0-5.0468.6 Cross Slope (Driveway)SF49478.3to $40 $1,9401548975ft
feet 2.0-3.0478.4 Cross Slope (Driveway)SF25483.3to $40 $9801548985ft
feet 2.0-3.0486.3 Cross Slope (Driveway)SF26491.4to $40 $1,0201548995ft
feet 6.0-7.0489.5 Running Slope REF10491.4to166523 5 ft
$126,390.00TOTAL COST FOR:E 26TH STSside of Starting at:SIERRA PINE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
762
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911211621
Run ID
E 26Th St
32
ID Sidewalk Width
Priority
feet 2.0-3.07.0 Cross Slope (PAR)SF5013.6to $120 $5,9401415838ft
feet 4.0-5.014.4 Cross Slope (PAR)SF3318.8to $120 $3,9601415848ft
feet18.8 Driveway43.6to164550
feet 2.0-3.044.3 Cross Slope (Driveway)SF9056.3to $40 $3,6001415858ft
feet 4.0-5.060.2 Cross Slope (PAR)SF1762.5to $120 $2,0701415868ft
feet 2.0-3.062.9 Cross Slope (PAR)SF10877.3to $120 $12,9601415878ft
feet77.8 Driveway100.8to164551
feet 2.0-3.0103.9 Cross Slope (PAR)SF180127.9to $120 $21,6001415888ft
$50,130.00TOTAL COST FOR:E 26TH STNside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
763
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151430
Run ID
E 26Th St
74.25
ID Sidewalk Width
Priority
feet 2.0-3.010.9 Cross Slope (PAR)SF1313.3to $120 $1,5121546365ft
feet 4.0-5.013.3 Cross Slope (PAR)SF3319.5to $120 $3,9061546375ft
feet 2.0-3.020.3 Cross Slope (PAR)SF9638.6to $120 $11,5291546385ft
feet 4.0-5.038.6 Cross Slope (PAR)SF6450.7to $120 $7,6231546395ft
feet 2.0-3.053.0 Cross Slope (PAR)SF954.7to $120 $1,0711546405ft
feet 4.0-5.055.6 Cross Slope (PAR)SF1859.0to $120 $2,1421546415ft
feet 3.0-4.061.4 Cross Slope (PAR)SF2967.0to $120 $3,5281546425ft
feet67.5 Continuous Width REF568.5to167204 5 ft
feet 5.0-6.068.6 Cross Slope (PAR)SF1872.0to $120 $2,1421546435ft
feet 3.0-4.072.0 Cross Slope (PAR)SF8287.7to $120 $9,8911546445ft
feet 2.0-3.087.7 Cross Slope (PAR)SF1289.9to $120 $1,3861546455ft
feet90.7 Driveway107.3to165758
feet -.3491.5 Vertical Change REF592.5to137521 5 ft
feet 2.0-3.0107.5 Cross Slope (PAR)SF27112.7to $120 $3,2761546465ft
feet 3.0-4.0119.4 Cross Slope (PAR)SF14122.1to $120 $1,7011546475ft
feet .59124.3 Vertical Change SF5125.3to $75 $3941375225ft
feet 3.0-4.0126.4 Cross Slope (PAR)SF35133.0to $120 $4,1581546485ft
feet133.0 Driveway149.2to165759
feet 2.0-3.0152.8 Cross Slope (PAR)SF23157.1to $120 $2,7091546495ft
feet -.28161.0 Vertical Change LF5162.0to $75 $3941375235ft
feet 5.0-6.0169.8 Cross Slope (PAR)SF9171.6to $120 $1,1341546505ft
feet172.3 Driveway187.6to165760
feet202.2 Driveway226.1to165761
feet .32214.3 Vertical Change REF5215.3to137524 5 ft
feet 5.0-6.0228.4 Cross Slope (PAR)SF7229.8to $120 $8821546515ft
feet 5.0-6.0232.7 Cross Slope (PAR)SF28238.0to $120 $3,3391546525ft
feet 3.0-4.0241.9 Cross Slope (PAR)SF7243.2to $120 $8191546535ft
feet 3.0-4.0245.8 Cross Slope (PAR)SF26250.8to $120 $3,1501546545ft
feet .38248.1 Vertical Change REF5249.1to137525 5 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
764
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151430
Run ID
E 26Th St
74.25
ID Sidewalk Width
Priority
feet 5.0-6.0255.4 Cross Slope (PAR)SF7256.8to $120 $8821546555ft
feet 3.0-4.0258.7 Cross Slope (PAR)SF24263.3to $120 $2,8981546565ft
feet .31261.4 Vertical Change REF5262.4to137526 5 ft
feet 3.0-4.0266.1 Cross Slope (PAR)SF27271.3to $120 $3,2761546575ft
feet 2.0-3.0283.7 Cross Slope (PAR)SF5284.7to $120 $6301546585ft
feet 2.0-3.0289.5 Cross Slope (PAR)SF102308.9to $120 $12,2221546595ft
feet 1.01311.2 Vertical Change REF5312.2to137527 5 ft
feet 3.0-4.0311.4 Cross Slope (PAR)SF25316.2to $120 $3,0241546605ft
feet314.4 Continuous Width SF5315.4to $120 $6301671375ft
feet 2.0-3.0316.8 Cross Slope (PAR)SF64328.9to $120 $7,6231546615ft
feet 2.0-3.0333.0 Cross Slope (PAR)SF36339.8to $120 $4,2841546625ft
feet 4.0-5.0343.7 Cross Slope (PAR)SF121366.8to $120 $14,5531546635ft
feet 2.0-3.0369.4 Cross Slope (PAR)SF7370.7to $120 $8191546645ft
feet 2.0-3.0373.1 Cross Slope (PAR)SF10375.0to $120 $1,1971546655ft
feet378.1 Driveway405.1to165762
feet .33393.9 Vertical Change REF5394.9to137528 5 ft
feet .27421.4 Vertical Change LF5422.4to $75 $3941375295ft
feet433.6 Continuous Width REF5434.6to167728 5 ft
feet 2.0-3.0433.9 Cross Slope (PAR)SF28439.2to $120 $3,3391546665ft
feet 4.0-5.0441.7 Cross Slope (PAR)SF6442.8to $120 $6931546675ft
feet444.2 Driveway468.7to165763
feet .29471.1 Vertical Change REF5472.1to137530 5 ft
feet 3.0-4.0471.5 Cross Slope (PAR)SF7472.8to $120 $8191546685ft
feet 2.0-3.0472.8 Cross Slope (PAR)SF23477.2to $120 $2,7721546695ft
feet 5.0-6.0475.6 Running Slope REF7476.9to166519 5 ft
$126,740.25TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
765
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING (3305 E 26TH ST)
End Street Name
2001151440
Run ID
E 26Th St
98.25
ID Sidewalk Width
Priority
feet0.6 Driveway13.8to165752
feet 4.0-5.013.8 Cross Slope (Driveway)SF1115.9to $40 $4411545775ft
feet 2.0-3.016.2 Cross Slope (PAR)SF3422.6to $120 $4,0321545785ft
feet 2.0819.2 Vertical Change REF520.2to137486 5 ft
feet 4.0-5.023.4 Cross Slope (PAR)SF4031.1to $120 $4,8511545795ft
feet -.3830.0 Vertical Change REF531.0to137487 5 ft
feet .2833.3 Vertical Change LF534.3to $75 $3941374885ft
feet 2.0-3.034.8 Cross Slope (PAR)SF1637.8to $120 $1,8901545805ft
feet 3.0-4.041.2 Cross Slope (PAR)SF742.5to $120 $8191545815ft
feet 4.0-5.046.5 Cross Slope (PAR)SF3352.7to $120 $3,9061545825ft
feet -.3549.7 Vertical Change REF550.7to137489 5 ft
feet 2.0-3.053.8 Cross Slope (PAR)SF9872.4to $120 $11,7181545835ft
feet .3169.2 Vertical Change REF570.2to137490 5 ft
feet 2.0-3.076.1 Cross Slope (PAR)SF1579.0to $120 $1,8271545845ft
feet -.3277.4 Vertical Change REF578.4to137491 5 ft
feet 4.0-5.079.9 Cross Slope (PAR)SF2183.9to $120 $2,5201545855ft
feet 2.0-3.084.4 Cross Slope (PAR)SF2088.3to $120 $2,4571545865ft
feet 2.0-3.091.5 Cross Slope (PAR)SF792.8to $120 $8191545875ft
feet 2.0-3.096.3 Cross Slope (PAR)SF1599.1to $120 $1,7641545885ft
feet101.1 Driveway130.9to165753
feet .26101.3 Vertical Change REF5102.3to137492 5 ft
feet -.26112.8 Vertical Change REF5113.8to137493 5 ft
feet 2.0-3.0136.5 Cross Slope (PAR)SF7137.8to $120 $8191545895ft
feet 2.0-3.0147.1 Cross Slope (PAR)SF13149.5to $120 $1,5121545905ft
feet 3.0-4.0152.2 Cross Slope (PAR)SF15155.1to $120 $1,8271545915ft
feet 3.0-4.0166.8 Cross Slope (PAR)SF5167.8to $120 $6301545925ft
feet 2.0-3.0172.3 Cross Slope (PAR)SF20176.1to $120 $2,3941545935ft
feet .29190.5 Vertical Change LF5191.5to $75 $3941374945ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
766
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING (3305 E 26TH ST)
End Street Name
2001151440
Run ID
E 26Th St
98.25
ID Sidewalk Width
Priority
feet 3.0-4.0197.1 Cross Slope (PAR)SF19200.8to $120 $2,3311545945ft
feet 2.0-3.0202.3 Cross Slope (PAR)SF9204.1to $120 $1,1341545955ft
feet 3.0-4.0206.3 Cross Slope (PAR)SF72220.1to $120 $8,6941545965ft
feet 1.4215.4 Vertical Change REF5216.4to137495 5 ft
feet226.8 Driveway349.3to165754
feet -.31256.9 Vertical Change REF5257.9to137497 5 ft
feet .26304.7 Vertical Change REF5305.7to137498 5 ft
feet -.27346.3 Vertical Change REF5347.3to137499 5 ft
feet 2.0-3.0350.0 Cross Slope (PAR)SF15352.9to $120 $1,8271545975ft
feet 3.0-4.0357.9 Cross Slope (PAR)SF6359.1to $120 $7561545985ft
feet 2.0-3.0362.8 Cross Slope (PAR)SF5363.8to $120 $6301545995ft
feet 4.0-5.0366.0 Cross Slope (PAR)SF17369.3to $120 $2,0791546005ft
feet .31373.7 Vertical Change LF5374.7to $75 $3941375005ft
feet373.9 Cold Patch 76388.3to140510 5 ft
feet 1.26375.6 Vertical Change SF5376.6to $75 $3941375015ft
feet .5386.7 Vertical Change SF5387.7to $75 $3941375025ft
feet 5.0-6.0390.1 Running Slope SF6391.2to $120 $6931665185ft
feet 2.0-3.0393.0 Cross Slope (PAR)SF84409.0to $120 $10,0801546015ft
feet 2.0-3.0418.2 Cross Slope (PAR)SF22422.4to $120 $2,6461546025ft
feet .31425.8 Vertical Change LF5426.8to $75 $3941375035ft
feet -.59427.7 Vertical Change SF5428.7to $75 $3941375045ft
feet 3.0-4.0432.9 Cross Slope (PAR)SF15435.7to $120 $1,7641546035ft
feet 2.0-3.0435.7 Cross Slope (PAR)SF50445.2to $120 $5,9851546045ft
feet 2.0-3.0447.3 Cross Slope (PAR)SF38454.5to $120 $4,5361546055ft
feet 4.0-5.0456.4 Cross Slope (PAR)SF41464.2to $120 $4,9141546065ft
feet464.2 Driveway500.1to165755
feet .35473.5 Vertical Change REF5474.5to137505 5 ft
feet 4.0-5.0500.1 Cross Slope (Driveway)SF14502.7to $40 $5461546075ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
767
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING (3305 E 26TH ST)
End Street Name
2001151440
Run ID
E 26Th St
98.25
ID Sidewalk Width
Priority
feet 1.53502.4 Vertical Change REF5503.4to137506 5 ft
feet 4.0-5.0505.2 Cross Slope (PAR)SF61516.9to $120 $7,3711546085ft
feet 4.0-5.0519.1 Cross Slope (PAR)SF6520.2to $120 $6931546095ft
feet 4.0-5.0523.3 Cross Slope (PAR)SF80538.6to $120 $9,6391546105ft
feet 3.0-4.0541.8 Cross Slope (PAR)SF15544.7to $120 $1,8271546115ft
feet 5.0-6.0544.9 Cross Slope (PAR)SF8546.4to $120 $9451546125ft
feet 5.0-6.0553.8 Cross Slope (PAR)SF6555.0to $120 $7561546135ft
feet 3.0-4.0556.1 Cross Slope (PAR)SF13558.5to $120 $1,5121546145ft
feet 2.0-3.0558.5 Cross Slope (PAR)SF28563.9to $120 $3,4021546155ft
feet .62559.3 Vertical Change REF5560.3to137507 5 ft
feet .89561.8 Vertical Change REF5562.8to137508 5 ft
feet 4.0-5.0564.7 Cross Slope (PAR)SF80579.9to $120 $9,5761546165ft
feet 2.46566.7 Vertical Change REF5567.7to137509 5 ft
feet 5.0-6.0582.7 Cross Slope (PAR)SF16585.8to $120 $1,9531546175ft
feet 2.74592.9 Vertical Change SF5593.9to $75 $3941375105ft
feet 5.0-6.0598.4 Cross Slope (PAR)SF6599.5to $120 $6931546185ft
feet 2.0-3.0601.3 Cross Slope (PAR)SF5602.3to $120 $6301546195ft
feet 4.0-5.0603.4 Cross Slope (PAR)SF6604.5to $120 $6931546205ft
feet .8608.0 Vertical Change SF5609.0to $75 $3941375115ft
feet 4.0-5.0609.1 Cross Slope (PAR)SF56619.8to $120 $6,7411546215ft
feet .3618.6 Vertical Change REF5619.6to137512 5 ft
feet 3.0-4.0625.8 Cross Slope (PAR)SF5626.8to $120 $6301546225ft
feet 3.0-4.0631.1 Cross Slope (PAR)SF22635.3to $120 $2,6461546235ft
feet 2.0-3.0635.3 Cross Slope (PAR)SF24639.9to $120 $2,8981546245ft
feet 4.14635.5 Vertical Change REF5636.5to137513 5 ft
feet641.7 Driveway676.6to165756
feet 2.18679.3 Vertical Change REF5680.3to137514 5 ft
feet 3.0-4.0680.3 Cross Slope (PAR)SF11682.4to $120 $1,3231546255ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
768
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING (3305 E 26TH ST)
End Street Name
2001151440
Run ID
E 26Th St
98.25
ID Sidewalk Width
Priority
feet -.28682.7 Vertical Change LF5683.7to $75 $3941375155ft
feet 3.0-4.0687.9 Cross Slope (PAR)SF13690.3to $120 $1,5121546265ft
feet .27692.9 Vertical Change REF5693.9to137516 5 ft
feet 2.0-3.0693.3 Cross Slope (PAR)SF8694.8to $120 $9451546275ft
feet 4.0-5.0696.8 Cross Slope (PAR)SF88713.6to $120 $10,5841546285ft
feet 3.0-4.0715.8 Cross Slope (PAR)SF79730.8to $120 $9,4501546295ft
feet 2.0-3.0732.0 Cross Slope (PAR)SF16735.1to $120 $1,9531546305ft
feet 4.0-5.0735.1 Cross Slope (PAR)SF75749.3to $120 $8,9461546315ft
feet .92749.9 Vertical Change SF5750.9to $75 $3941375175ft
feet750.1 Driveway767.4to165757
feet 5.0-6.0767.4 Cross Slope (Driveway)SF27772.6to $40 $1,0921546325ft
feet 4.0-5.0779.6 Cross Slope (PAR)SF8781.2to $120 $1,0081546335ft
feet 4.0-5.0783.3 Cross Slope (PAR)SF127807.4to $120 $15,1831546345ft
feet .57793.2 Vertical Change REF5794.2to137518 5 ft
feet -.35811.1 Vertical Change REF5812.1to137519 5 ft
feet 13.0-14.0811.4 Cross Slope (PAR)SF124835.1to $120 $14,9311546355ft
feet841.5 Driveway870.0to164438
feet .36892.1 Vertical Change LF5893.1to $75 $3941375205ft
$217,098.00TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
769
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
MINERVA ST
End Street Name
1911211533
Run ID
E 26Th St
67
ID Sidewalk Width
Priority
feet 2.0-3.00.7 Cross Slope (PAR)SF5611.3to $120 $6,6781417415ft
feet .542.0 Vertical Change REF53.0to133458 5 ft
feet .814.1 Vertical Change REF55.1to133459 5 ft
feet .528.9 Vertical Change REF59.9to133460 5 ft
feet 4.0-5.014.4 Cross Slope (PAR)SF4523.0to $120 $5,4181417425ft
feet .5319.2 Vertical Change REF520.2to133461 5 ft
feet -.2923.6 Vertical Change LF524.6to $75 $3941334625ft
feet 2.0-3.028.0 Cross Slope (PAR)SF1430.6to $120 $1,6381417435ft
feet 2.0-3.035.0 Cross Slope (PAR)SF936.8to $120 $1,1341417445ft
feet 2.0-3.042.6 Cross Slope (PAR)SF15972.8to $120 $19,0261417455ft
feet 2.0-3.075.5 Cross Slope (PAR)SF977.2to $120 $1,0711417465ft
feet77.9 Cold Patch 3183.9to140262 5 ft
feet .3681.0 Vertical Change LF582.0to $75 $3941334635ft
feet 2.0-3.089.2 Cross Slope (PAR)SF1091.1to $120 $1,1971417475ft
feet 2.6391.4 Vertical Change SF592.4to $75 $3941334645ft
feet 2.0-3.094.0 Cross Slope (PAR)SF2899.3to $120 $3,3391417485ft
feet 2.0-3.0101.8 Cross Slope (PAR)SF65114.2to $120 $7,8121417495ft
feet 4.0-5.0114.7 Cross Slope (PAR)SF45123.2to $120 $5,3551417505ft
feet 2.0-3.0126.2 Cross Slope (PAR)SF53136.3to $120 $6,3631417515ft
feet 1.19129.8 Vertical Change REF5130.8to133465 5 ft
feet 2.0-3.0138.8 Cross Slope (PAR)SF15141.7to $120 $1,8271417525ft
feet 3.0-4.0154.4 Cross Slope (PAR)SF7155.8to $120 $8821417535ft
feet 2.0-3.0164.8 Cross Slope (PAR)SF69177.9to $120 $8,2531417545ft
feet177.9 Driveway221.1to164563
feet -.26194.3 Vertical Change REF5195.3to133466 5 ft
feet .27211.7 Vertical Change REF5212.7to133467 5 ft
feet 4.0-5.0222.0 Cross Slope (PAR)SF53232.0to $120 $6,3001417555ft
feet 2.0-3.0232.9 Cross Slope (PAR)SF36239.8to $120 $4,3471417565ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
770
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
MINERVA ST
End Street Name
1911211533
Run ID
E 26Th St
67
ID Sidewalk Width
Priority
feet 3.35243.1 Vertical Change REF5244.1to133468 5 ft
feet 2.0-3.0243.9 Cross Slope (PAR)SF23248.2to $120 $2,7091417575ft
feet -.26246.4 Vertical Change REF5247.4to133469 5 ft
feet 3.0-4.0250.3 Cross Slope (PAR)SF23254.7to $120 $2,7721417585ft
feet252.4 Continuous Width SF5253.4to $120 $6301671105ft
feet 2.0-3.0254.7 Cross Slope (PAR)SF144282.1to $120 $17,2621417595ft
feet 3.46259.0 Vertical Change REF5260.0to133470 5 ft
feet .31261.0 Vertical Change REF5262.0to133471 5 ft
feet .43271.6 Vertical Change REF5272.6to133472 5 ft
feet275.6 Continuous Width SF5276.6to $120 $6301670905ft
feet282.5 Driveway309.3to164564
feet 2.0-3.0310.8 Cross Slope (PAR)SF16313.8to $120 $1,8901417605ft
feet313.8 Driveway378.5to164565
feet 2.0-3.0379.0 Cross Slope (PAR)SF104398.8to $120 $12,4741417615ft
feet 2.0-3.0401.5 Cross Slope (PAR)SF30407.2to $120 $3,5911417625ft
feet 2.0-3.0411.9 Cross Slope (PAR)SF23416.3to $120 $2,7721417635ft
feet 4.0-5.0421.8 Cross Slope (PAR)SF8423.3to $120 $9451417645ft
feet 2.0-3.0423.9 Cross Slope (PAR)SF5424.9to $120 $6301417655ft
feet 3.0-4.0432.5 Cross Slope (PAR)SF11434.6to $120 $1,3231417665ft
feet 2.0-3.0434.6 Cross Slope (PAR)SF19438.3to $120 $2,3311417675ft
feet439.3 Driveway455.4to164566
feet 2.88439.9 Vertical Change REF5440.9to133473 5 ft
feet .26458.1 Vertical Change LF5459.1to $75 $3941334745ft
$132,174.00TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
771
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING BEFORE S
DOWNEY RD
End Street Name
2001151335
Run ID
E 26Th St
55.5
ID Sidewalk Width
Priority
feet 2.0-3.00.5 Cross Slope (PAR)SF121.7to $120 $1,47615480910ft
feet 4.0-5.04.1 Cross Slope (PAR)SF155.6to $120 $1,84515481010ft
feet 2.0-3.07.5 Cross Slope (PAR)SF229.6to $120 $2,58315481110ft
feet 4.0-5.026.2 Cross Slope (PAR)SF5531.6to $120 $6,64215481210ft
feet 3.0-4.034.8 Cross Slope (PAR)SF2136.8to $120 $2,46015481310ft
feet 2.0-3.036.9 Cross Slope (PAR)SF1638.5to $120 $1,96815481410ft
feet 5.0-6.040.1 Cross Slope (PAR)SF1041.1to $120 $1,23015481510ft
feet 6.0-7.041.3 Cross Slope (PAR)SF1042.3to $120 $1,23015481610ft
feet 3.0-4.045.3 Cross Slope (PAR)SF3148.3to $120 $3,69015481710ft
feet 2.0-3.057.3 Cross Slope (PAR)SF1158.4to $120 $1,35315481810ft
feet60.1 Driveway117.8to165770
feet 2.0-3.0135.8 Cross Slope (PAR)SF59141.6to $120 $7,13415481910ft
feet 2.0-3.0152.5 Cross Slope (PAR)SF32155.6to $120 $3,81315482010ft
feet 2.0-3.0158.3 Cross Slope (PAR)SF23160.5to $120 $2,70615482110ft
feet 2.0-3.0170.8 Cross Slope (PAR)SF56176.3to $120 $6,76515482210ft
feet 2.0-3.0183.0 Cross Slope (PAR)SF59188.8to $120 $7,13415482310ft
feet 2.0-3.0192.7 Cross Slope (PAR)SF68199.3to $120 $8,11815482410ft
feet 2.0-3.0204.5 Cross Slope (PAR)SF12205.7to $120 $1,47615482510ft
feet 2.0-3.0207.8 Cross Slope (PAR)SF50212.7to $120 $6,02715482610ft
feet 2.0-3.0215.8 Cross Slope (PAR)SF15217.3to $120 $1,84515482710ft
feet .63218.4 Vertical Change SF10219.4to $75 $76913755410ft
feet 2.0-3.0225.8 Cross Slope (PAR)SF16227.4to $120 $1,96815482810ft
feet 2.0-3.0230.2 Cross Slope (PAR)SF25232.6to $120 $2,95215482910ft
feet240.1 Driveway283.7to165771
feet 3.0-4.0290.3 Cross Slope (PAR)SF10291.3to $120 $1,23015483010ft
feet 2.0-3.0291.8 Cross Slope (PAR)SF17293.5to $120 $2,09115483110ft
feet 4.0-5.0304.8 Cross Slope (PAR)SF13306.1to $120 $1,59915483210ft
feet306.1 Driveway342.2to165772
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
772
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING BEFORE S
DOWNEY RD
End Street Name
2001151335
Run ID
E 26Th St
55.5
ID Sidewalk Width
Priority
feet -.31313.0 Vertical Change REF10314.0to137555 10 ft
feet .27329.1 Vertical Change REF10330.1to137556 10 ft
feet 5.0-6.0343.1 Cross Slope (PAR)SF45347.5to $120 $5,41215483310ft
feet 2.0-3.0354.1 Cross Slope (PAR)SF23356.3to $120 $2,70615483410ft
feet 2.0-3.0367.8 Cross Slope (PAR)SF13369.1to $120 $1,59915483510ft
feet 2.0-3.0372.7 Cross Slope (PAR)SF15374.2to $120 $1,84515483610ft
feet 2.0-3.0380.8 Cross Slope (PAR)SF16382.4to $120 $1,96815483710ft
feet 2.0-3.0385.5 Cross Slope (PAR)SF18387.3to $120 $2,21415483810ft
feet 2.0-3.0390.2 Cross Slope (PAR)SF256415.2to $120 $30,75015483910ft
feet 2.0-3.0417.8 Cross Slope (PAR)SF118429.3to $120 $14,14515484010ft
feet 4.0-5.0430.1 Cross Slope (PAR)SF21432.1to $120 $2,46015484110ft
feet432.1 Driveway464.3to165773
feet432.1 Driveway530.5to165774
feet -.28441.0 Vertical Change REF29443.8to137557 10 ft
feet 4.0-5.0467.3 Cross Slope (Driveway)SF64473.5to $40 $2,54215484210ft
feet -.27470.1 Vertical Change REF10471.1to137558 10 ft
feet 3.0-4.0479.7 Cross Slope (Driveway)SF11480.8to $40 $45115484310ft
feet 2.0-3.0480.8 Cross Slope (Driveway)SF33484.0to $40 $1,31215484410ft
feet 4.0-5.0484.2 Cross Slope (Driveway)SF10485.2to $40 $41015484510ft
feet 4.0-5.0487.8 Cross Slope (Driveway)SF17489.5to $40 $69715484610ft
feet 5.0-6.0493.0 Cross Slope (Driveway)SF23495.2to $40 $90215484710ft
feet .38496.8 Vertical Change REF10497.8to137559 10 ft
feet 2.0-3.0500.2 Cross Slope (Driveway)SF160515.8to $40 $6,39615484810ft
feet 4.0-5.0516.3 Cross Slope (Driveway)SF19518.2to $40 $77915484910ft
feet 3.47520.2 Vertical Change REF10521.2to137560 10 ft
feet 3.0-4.0522.7 Cross Slope (Driveway)SF36526.2to $40 $1,43515485010ft
$158,126.75TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
773
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151531
Run ID
E 26Th St
42.75
ID Sidewalk Width
Priority
feet 4.0-5.00.5 Cross Slope (PAR)SF112.6to $120 $1,2601542655ft
feet0.5 Continuous Width SF51.5to $120 $6001675985ft
feet3.3 Driveway47.0to165729
feet .7310.6 Vertical Change REF511.6to137454 5 ft
feet .5135.9 Vertical Change REF536.9to137455 5 ft
feet 4.0-5.048.7 Cross Slope (PAR)SF750.1to $120 $8401542665ft
feet 2.0-3.072.0 Cross Slope (PAR)SF873.5to $120 $9001542675ft
feet 5.0-6.082.0 Cross Slope (PAR)SF1284.3to $120 $1,3801542685ft
feet83.9 Continuous Width SF584.9to $120 $6001668335ft
feet 3.0-4.085.6 Cross Slope (PAR)SF887.2to $120 $9601542695ft
feet 2.0-3.090.8 Cross Slope (PAR)SF591.8to $120 $6001542705ft
feet 2.0-3.095.5 Cross Slope (PAR)SF596.5to $120 $6001542715ft
feet .26103.9 Vertical Change LF5104.9to $75 $3751374565ft
feet 3.0-4.0108.6 Cross Slope (PAR)SF5109.6to $120 $6001542725ft
feet123.3 Continuous Width SF5124.3to $120 $6001676505ft
feet 2.0-3.0125.0 Cross Slope (PAR)SF10126.9to $120 $1,1401542735ft
feet127.8 Driveway145.7to165730
feet 3.0-4.0145.7 Cross Slope (Driveway)SF14148.5to $40 $5601542745ft
feet 2.0-3.0183.3 Cross Slope (PAR)SF8184.9to $120 $9601542755ft
feet 2.0-3.0188.3 Cross Slope (PAR)SF82204.6to $120 $9,7801542765ft
feet198.8 Continuous Width REF5199.8to167708 5 ft
feet206.3 Driveway258.6to165731
feet 2.0-3.0260.9 Cross Slope (PAR)SF14263.6to $120 $1,6201542775ft
feet262.9 Continuous Width REF5263.9to167691 5 ft
feet 2.0-3.0267.0 Cross Slope (PAR)SF8268.6to $120 $9601542785ft
feet 5.0-6.0270.3 Cross Slope (PAR)SF8271.8to $120 $9001542795ft
feet 3.0-4.0272.9 Cross Slope (PAR)SF20276.8to $120 $2,3401542805ft
feet278.8 Continuous Width SF5279.8to $120 $6001673235ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
774
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
SIERRA PINE AVE
End Street Name
2001151531
Run ID
E 26Th St
42.75
ID Sidewalk Width
Priority
feet 6.0-7.0282.7 Cross Slope (PAR)SF6283.8to $120 $6601542815ft
feet 4.0-5.0290.1 Cross Slope (PAR)SF9291.9to $120 $1,0801542825ft
feet290.3 Continuous Width REF5291.3to167692 5 ft
feet293.3 Driveway318.8to165732
feet293.3 Driveway360.7to165733
feet -.48304.6 Vertical Change REF5305.6to137457 5 ft
feet 3.0-4.0323.8 Cross Slope (Driveway)SF13326.4to $40 $5201542835ft
feet 2.0-3.0326.8 Cross Slope (Driveway)SF8328.3to $40 $3001542845ft
feet 3.0-4.0331.8 Cross Slope (Driveway)SF5332.8to $40 $2001542855ft
feet 5.0-6.0333.3 Cross Slope (Driveway)SF18336.8to $40 $7001542865ft
feet333.8 Continuous Width REF5334.8to166879 5 ft
feet 3.0-4.0338.4 Cross Slope (Driveway)SF26343.6to $40 $1,0401542875ft
feet 2.0-3.0344.4 Cross Slope (Driveway)SF10346.4to $40 $4001542885ft
feet344.8 Continuous Width REF5345.8to167693 5 ft
feet 4.0-5.0353.3 Cross Slope (Driveway)SF10355.3to $40 $4001542895ft
feet 5.0-6.0358.4 Running Slope REF7359.8to166511 5 ft
$33,475.00TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
775
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151456
Run ID
E 26Th St
87.25
ID Sidewalk Width
Priority
feet 2.0-3.00.8 Cross Slope (PAR)SF235.1to $120 $2,7091544375ft
feet 2.0-3.07.8 Cross Slope (PAR)SF99.5to $120 $1,0711544385ft
feet 5.0-6.010.5 Cross Slope (PAR)SF3817.8to $120 $4,5991544395ft
feet 3.0-4.020.3 Cross Slope (PAR)SF2825.7to $120 $3,4021544405ft
feet -.3526.1 Vertical Change LF527.1to $75 $3941374765ft
feet 2.0-3.027.4 Cross Slope (PAR)SF3534.1to $120 $4,2211544415ft
feet 2.0-3.039.1 Cross Slope (PAR)SF640.3to $120 $7561544425ft
feet 2.0-3.044.7 Cross Slope (PAR)SF1647.8to $120 $1,9531544435ft
feet 4.0-5.049.3 Cross Slope (PAR)SF7062.6to $120 $8,3791544445ft
feet .3649.9 Vertical Change REF550.9to137477 5 ft
feet 2.0-3.063.7 Cross Slope (PAR)SF865.2to $120 $9451544455ft
feet 3.0-4.067.8 Cross Slope (PAR)SF3975.3to $120 $4,7251544465ft
feet 4.0-5.079.1 Cross Slope (PAR)SF2884.4to $120 $3,3391544475ft
feet 2.0-3.086.3 Cross Slope (PAR)SF587.3to $120 $6301544485ft
feet 2.0-3.090.2 Cross Slope (PAR)SF1693.3to $120 $1,9531544495ft
feet 4.0-5.096.0 Cross Slope (PAR)SF1398.5to $120 $1,5751544505ft
feet 4.0-5.0101.3 Cross Slope (PAR)SF25106.0to $120 $2,9611544515ft
feet 3.0-4.0108.2 Cross Slope (PAR)SF47117.1to $120 $5,6071544525ft
feet 4.0-5.0124.8 Cross Slope (PAR)SF44133.1to $120 $5,2291544535ft
feet 5.0-6.0130.8 Running Slope REF7132.1to166516 5 ft
feet133.3 Driveway197.2to165740
feet .51182.8 Vertical Change REF5183.8to137478 5 ft
feet 4.0-5.0198.8 Cross Slope (PAR)SF18202.2to $120 $2,1421544545ft
feet 4.0-5.0206.7 Cross Slope (PAR)SF16209.8to $120 $1,9531544555ft
feet 3.0-4.0214.3 Cross Slope (PAR)SF92231.9to $120 $11,0881544565ft
feet232.0 Driveway276.5to165741
feet 3.0-4.0276.8 Cross Slope (PAR)SF49286.2to $120 $5,9221544575ft
feet 5.0-6.0287.3 Cross Slope (PAR)SF16290.3to $120 $1,8901544585ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
776
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151456
Run ID
E 26Th St
87.25
ID Sidewalk Width
Priority
feet 3.0-4.0290.3 Cross Slope (PAR)SF23294.7to $120 $2,7721544595ft
feet 2.0-3.0296.3 Cross Slope (PAR)SF6297.5to $120 $7561544605ft
feet 2.0-3.0302.3 Cross Slope (PAR)SF22306.4to $120 $2,5831544615ft
feet 3.0-4.0309.3 Cross Slope (PAR)SF33315.5to $120 $3,9061544625ft
feet 5.0-6.0315.2 Running Slope REF8316.8to166517 5 ft
feet318.3 Driveway366.2to165742
feet 2.0-3.0368.4 Cross Slope (PAR)SF30374.1to $120 $3,5911544635ft
feet 3.0-4.0377.9 Cross Slope (PAR)SF44386.3to $120 $5,2921544645ft
feet 3.0-4.0390.9 Cross Slope (PAR)SF9392.7to $120 $1,1341544655ft
feet 4.0-5.0395.3 Cross Slope (PAR)SF25400.0to $120 $2,9611544665ft
feet 2.0-3.0408.1 Cross Slope (PAR)SF59419.3to $120 $7,0561544675ft
feet -.26417.5 Vertical Change REF5418.5to137479 5 ft
feet 2.0-3.0424.6 Cross Slope (PAR)SF9426.4to $120 $1,1341544685ft
feet429.6 Driveway464.9to165743
feet 3.0-4.0467.2 Cross Slope (PAR)SF8468.7to $120 $9451544695ft
feet 3.0-4.0471.4 Cross Slope (PAR)SF13473.8to $120 $1,5121544705ft
feet 2.0-3.0474.1 Cross Slope (PAR)SF81489.6to $120 $9,7651544715ft
feet 3.0-4.0492.4 Cross Slope (PAR)SF25497.2to $120 $3,0241544725ft
feet 2.0-3.0497.9 Cross Slope (PAR)SF55508.3to $120 $6,5521544735ft
feet .31511.5 Vertical Change LF5512.5to $75 $3941374805ft
feet 2.0-3.0517.3 Cross Slope (PAR)SF16520.3to $120 $1,8901544745ft
feet 3.0-4.0522.4 Cross Slope (PAR)SF14525.1to $120 $1,7011544755ft
feet 2.0-3.0525.1 Cross Slope (PAR)SF6526.3to $120 $7561544765ft
feet 2.0-3.0530.3 Cross Slope (PAR)SF9532.0to $120 $1,0711544775ft
feet -.39533.7 Vertical Change LF5534.7to $75 $3941374815ft
feet534.5 Driveway563.0to165744
feet 3.0-4.0563.7 Cross Slope (PAR)SF54573.9to $120 $6,4261544785ft
feet 5.0-6.0575.8 Cross Slope (PAR)SF16578.8to $120 $1,8901544795ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
777
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151456
Run ID
E 26Th St
87.25
ID Sidewalk Width
Priority
feet 3.0-4.0583.3 Cross Slope (PAR)SF11585.4to $120 $1,3231544805ft
feet 5.0-6.0585.4 Cross Slope (PAR)SF5586.4to $120 $6301544815ft
feet 6.0-7.0586.9 Cross Slope (PAR)SF8588.5to $120 $1,0081544825ft
feet 5.0-6.0591.8 Cross Slope (PAR)SF28597.1to $120 $3,3391544835ft
feet 3.0-4.0597.8 Cross Slope (PAR)SF24602.3to $120 $2,8351544845ft
feet 5.0-6.0602.3 Cross Slope (PAR)SF19605.9to $120 $2,2681544855ft
feet606.7 Driveway642.0to165745
feet 2.0-3.0643.3 Cross Slope (PAR)SF46652.0to $120 $5,4811544865ft
feet 2.0-3.0655.4 Cross Slope (PAR)SF17658.7to $120 $2,0791544875ft
feet658.8 Driveway697.7to165746
feet 2.0-3.0729.1 Cross Slope (PAR)SF33735.3to $120 $3,9061544885ft
feet 2.0-3.0739.4 Cross Slope (PAR)SF57750.3to $120 $6,8671544895ft
feet 2.0-3.0759.3 Cross Slope (PAR)SF36766.2to $120 $4,3471544905ft
feet 4.0-5.0770.7 Cross Slope (PAR)SF30776.4to $120 $3,5911544915ft
feet 4.0-5.0779.7 Cross Slope (PAR)SF8781.2to $120 $9451544925ft
feet 4.0-5.0783.9 Cross Slope (PAR)SF13786.3to $120 $1,5121544935ft
feet 4.0-5.0788.5 Cross Slope (PAR)SF42796.5to $120 $5,0401544945ft
feet 4.0-5.0801.8 Cross Slope (PAR)SF6802.9to $120 $6931544955ft
feet 4.0-5.0805.2 Cross Slope (PAR)SF32811.2to $120 $3,7801544965ft
feet 2.0-3.0812.8 Cross Slope (PAR)SF5813.8to $120 $6301544975ft
feet814.8 Driveway856.2to165747
feet 4.0-5.0856.2 Cross Slope (Driveway)SF19859.9to $40 $7771544985ft
feet 3.0-4.0862.9 Cross Slope (PAR)SF8864.4to $120 $9451544995ft
feet 2.0-3.0865.0 Cross Slope (PAR)SF88881.8to $120 $10,5841545005ft
feet 1.82876.2 Vertical Change REF5877.2to137482 5 ft
feet 5.0-6.0883.4 Cross Slope (PAR)SF29889.0to $120 $3,5281545015ft
feet 3.0-4.0890.1 Cross Slope (PAR)SF13892.5to $120 $1,5121545025ft
feet 2.0-3.0892.9 Cross Slope (PAR)SF52902.8to $120 $6,2371545035ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
778
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151456
Run ID
E 26Th St
87.25
ID Sidewalk Width
Priority
feet 2.0-3.0907.3 Cross Slope (PAR)SF7908.6to $120 $8191545045ft
feet 4.0-5.0910.5 Cross Slope (PAR)SF7911.8to $120 $8191545055ft
feet .37913.9 Vertical Change LF5914.9to $75 $3941374835ft
feet 3.0-4.0915.1 Cross Slope (PAR)SF26920.1to $120 $3,1501545065ft
feet 2.0-3.0920.8 Cross Slope (PAR)SF24925.3to $120 $2,8351545075ft
feet 4.0-5.0927.6 Cross Slope (PAR)SF22931.7to $120 $2,5831545085ft
feet 2.0-3.0932.5 Cross Slope (PAR)SF26937.5to $120 $3,1501545095ft
feet 3.0-4.0944.7 Cross Slope (PAR)SF15947.6to $120 $1,8271545105ft
feet 2.0-3.0949.0 Cross Slope (PAR)SF46957.8to $120 $5,5441545115ft
feet 2.0-3.0965.0 Cross Slope (PAR)SF57975.9to $120 $6,8671545125ft
feet 3.0-4.0978.2 Cross Slope (PAR)SF1551007.8to $120 $18,6481545135ft
feet 2.0-3.01008.8 Cross Slope (PAR)SF181012.3to $120 $2,2051545145ft
feet 4.0-5.01013.8 Cross Slope (PAR)SF61014.9to $120 $6931545155ft
feet 2.0-3.01016.3 Cross Slope (PAR)SF291021.9to $120 $3,5281545165ft
feet 4.0-5.01022.3 Cross Slope (PAR)SF321028.4to $120 $3,8431545175ft
feet 3.0-4.01030.9 Cross Slope (PAR)SF201034.8to $120 $2,4571545185ft
feet 2.0-3.01042.7 Cross Slope (PAR)SF291048.3to $120 $3,5281545195ft
feet1048.9 Continuous Width REF51049.9to167203 5 ft
feet 2.0-3.01052.8 Cross Slope (PAR)SF451061.3to $120 $5,3551545205ft
feet1062.1 Cold Patch 181065.6to140508 5 ft
feet 3.0-4.01068.7 Cross Slope (PAR)SF71070.0to $120 $8191545215ft
feet1074.3 Cold Patch 181077.8to140509 5 ft
feet 2.0-3.01081.9 Cross Slope (PAR)SF291087.4to $120 $3,4651545225ft
feet 3.0-4.01091.9 Cross Slope (PAR)SF681104.8to $120 $8,1271545235ft
feet 4.0-5.01107.6 Cross Slope (PAR)SF211111.6to $120 $2,5201545245ft
feet 2.0-3.01111.8 Cross Slope (PAR)SF321117.9to $120 $3,8431545255ft
feet 4.0-5.01119.3 Cross Slope (PAR)SF181122.8to $120 $2,2051545265ft
feet 2.0-3.01123.8 Cross Slope (PAR)SF131126.2to $120 $1,5121545275ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
779
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
S SOTO ST
End Street Name
2001151456
Run ID
E 26Th St
87.25
ID Sidewalk Width
Priority
feet 4.0-5.01132.0 Cross Slope (PAR)SF71133.4to $120 $8821545285ft
feet 4.0-5.01136.3 Cross Slope (PAR)SF221140.5to $120 $2,6461545295ft
feet 4.0-5.01142.9 Cross Slope (PAR)SF301148.7to $120 $3,6541545305ft
feet 3.0-4.01161.7 Cross Slope (PAR)SF61162.9to $120 $7561545315ft
feet 3.0-4.01168.8 Cross Slope (PAR)SF51169.8to $120 $6301545325ft
feet 3.0-4.01172.5 Cross Slope (PAR)SF51173.5to $120 $6301545335ft
feet1173.0 Continuous Width SF51174.0to $120 $6301669985ft
feet 2.0-3.01173.5 Cross Slope (PAR)SF51174.5to $120 $6301545345ft
feet 2.0-3.01177.1 Cross Slope (PAR)SF71178.5to $120 $8821545355ft
$320,880.00TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING (3211 E 26TH
ST)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
780
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151523
Run ID
E 26Th St
74.25
ID Sidewalk Width
Priority
feet 2.0-3.013.3 Cross Slope (PAR)SF7227.6to $120 $8,5801542905ft
feet14.0 Continuous Width REF515.0to166861 5 ft
feet19.5 Continuous Width SF520.5to $120 $6001676515ft
feet 3.0-4.034.9 Cross Slope (PAR)SF1437.7to $120 $1,6801542915ft
feet 3.0-4.042.4 Cross Slope (PAR)SF843.9to $120 $9001542925ft
feet 3.0-4.048.8 Cross Slope (PAR)SF950.6to $120 $1,0801542935ft
feet 4.0-5.053.3 Cross Slope (PAR)SF854.8to $120 $9001542945ft
feet 4.0-5.062.7 Cross Slope (PAR)SF663.8to $120 $6601542955ft
feet 2.0-3.067.1 Cross Slope (PAR)SF1369.7to $120 $1,5601542965ft
feet 3.0-4.078.3 Cross Slope (PAR)SF1380.8to $120 $1,5001542975ft
feet80.8 Continuous Width SF581.8to $120 $6001676525ft
feet 2.0-3.081.0 Cross Slope (PAR)SF682.1to $120 $6601542985ft
feet 1.3985.0 Vertical Change SF586.0to $75 $3751374585ft
feet 2.0-3.086.6 Cross Slope (PAR)SF687.8to $120 $7201542995ft
feet 2.0-3.096.9 Cross Slope (PAR)SF18100.4to $120 $2,1001543005ft
feet 3.0-4.0111.0 Cross Slope (PAR)SF38118.6to $120 $4,5601543015ft
feet 2.0-3.0118.6 Cross Slope (PAR)SF8120.2to $120 $9601543025ft
feet 2.0-3.0123.8 Cross Slope (PAR)SF5124.8to $120 $6001543035ft
feet 3.0-4.0137.5 Cross Slope (PAR)SF6138.7to $120 $7201543045ft
feet .27138.3 Vertical Change REF5139.3to137459 5 ft
feet 5.0-6.0141.1 Cross Slope (PAR)SF8142.6to $120 $9001543055ft
feet 3.49142.7 Vertical Change SF5143.7to $75 $3751374605ft
feet 2.0-3.0144.0 Cross Slope (PAR)SF83160.6to $120 $9,9601543065ft
feet145.5 Continuous Width SF5146.5to $120 $6001676535ft
feet .31145.6 Vertical Change REF5146.6to137461 5 ft
feet158.4 Continuous Width REF5159.4to167257 5 ft
feet 2.0-3.0169.8 Cross Slope (PAR)SF33176.3to $120 $3,9001543075ft
feet183.6 Continuous Width REF5184.6to167807 5 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
781
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151523
Run ID
E 26Th St
74.25
ID Sidewalk Width
Priority
feet 2.0-3.0190.3 Cross Slope (PAR)SF79206.0to $120 $9,4201543085ft
feet 1.35195.0 Vertical Change REF5196.0to137462 5 ft
feet 3.0-4.0212.4 Cross Slope (PAR)SF34219.1to $120 $4,0201543095ft
feet 4.0-5.0221.5 Cross Slope (PAR)SF14224.3to $120 $1,6801543105ft
feet 2.0-3.0225.4 Cross Slope (PAR)SF10227.3to $120 $1,1401543115ft
feet 4.0-5.0229.2 Cross Slope (PAR)SF9230.9to $120 $1,0201543125ft
feet 3.0-4.0234.0 Cross Slope (PAR)SF9235.8to $120 $1,0801543135ft
feet 2.37254.4 Vertical Change REF5255.4to137463 5 ft
feet 2.0-3.0254.8 Cross Slope (PAR)SF24259.5to $120 $2,8201543145ft
feet256.8 Continuous Width SF5257.8to $120 $6001676545ft
feet -.27257.1 Vertical Change REF5258.1to137464 5 ft
feet 2.64260.6 Vertical Change SF5261.6to $75 $3751374655ft
feet 3.0-4.0263.3 Cross Slope (PAR)SF9265.0to $120 $1,0201543155ft
feet 2.0-3.0265.0 Cross Slope (PAR)SF13267.5to $120 $1,5001543165ft
feet 3.0-4.0273.8 Cross Slope (PAR)SF15276.8to $120 $1,8001543175ft
feet 2.0-3.0277.5 Cross Slope (PAR)SF5278.5to $120 $6001543185ft
feet279.9 Driveway342.5to165734
feet 4.0-5.0343.7 Cross Slope (PAR)SF16346.8to $120 $1,8601543195ft
feet 2.0-3.0346.8 Cross Slope (PAR)SF35353.7to $120 $4,1401543205ft
feet348.8 Continuous Width REF5349.8to166862 5 ft
feet 2.88357.7 Vertical Change REF5358.7to137466 5 ft
feet 3.0-4.0358.0 Cross Slope (PAR)SF14360.8to $120 $1,6801543215ft
feet 4.0-5.0363.3 Cross Slope (PAR)SF8364.9to $120 $9601543225ft
feet 2.0-3.0366.3 Cross Slope (PAR)SF17369.7to $120 $2,0401543235ft
feet 4.0-5.0370.7 Cross Slope (PAR)SF36377.8to $120 $4,2601543245ft
feet 2.0-3.0377.8 Cross Slope (PAR)SF26382.9to $120 $3,0601543255ft
feet 4.0-5.0383.6 Cross Slope (PAR)SF11385.8to $120 $1,3201543265ft
feet 2.0-3.0388.9 Cross Slope (PAR)SF5389.9to $120 $6001543275ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
782
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 26TH ST
Street Side
TRAIN CROSSING (3211 E
26TH ST)
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
2001151523
Run ID
E 26Th St
74.25
ID Sidewalk Width
Priority
feet 5.0-6.0391.3 Cross Slope (PAR)SF23395.8to $120 $2,7001543285ft
feet 3.0-4.0396.0 Cross Slope (PAR)SF16399.2to $120 $1,9201543295ft
feet 3.0-4.0401.3 Cross Slope (PAR)SF7402.7to $120 $8401543305ft
feet 2.0-3.0402.7 Cross Slope (PAR)SF126427.8to $120 $15,0601543315ft
feet415.2 Continuous Width SF5416.2to $120 $6001676555ft
feet 4.0-5.0429.3 Cross Slope (PAR)SF135456.3to $120 $16,2001543325ft
feet 3.0-4.0461.8 Cross Slope (PAR)SF11463.9to $120 $1,2601543335ft
feet 2.0-3.0467.8 Cross Slope (PAR)SF20471.7to $120 $2,3401543345ft
feet 4.0-5.0472.6 Cross Slope (PAR)SF79488.3to $120 $9,4201543355ft
feet479.6 Continuous Width SF5480.6to $120 $6001676565ft
feet .5491.6 Vertical Change REF5492.6to137467 5 ft
feet 4.0-5.0491.6 Cross Slope (PAR)SF20495.5to $120 $2,3401543365ft
feet 5.0-6.0497.8 Cross Slope (PAR)SF30503.8to $120 $3,6001543375ft
feet -.41500.3 Vertical Change REF5501.3to137468 5 ft
feet 3.0-4.0504.7 Cross Slope (PAR)SF6505.8to $120 $6601543385ft
feet 2.0-3.0505.9 Cross Slope (PAR)SF21510.0to $120 $2,4601543395ft
feet 5.0-6.0510.5 Cross Slope (PAR)SF6511.6to $120 $6601543405ft
feet -.3522.8 Vertical Change LF5523.8to $75 $3751374695ft
feet 3.0-4.0530.1 Cross Slope (PAR)SF46539.3to $120 $5,5201543415ft
feet 2.0-3.0545.4 Cross Slope (PAR)SF54556.1to $120 $6,4201543425ft
feet 2.0-3.0559.4 Cross Slope (PAR)SF12561.8to $120 $1,4401543435ft
feet 6.0-7.0559.8 Running Slope REF10561.7to166512 5 ft
$165,900.00TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING (3211 E 26TH
ST)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
783
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING (3305 E
26TH ST)
Survey Street Name Starting Street Name
TRAIN CROSSING (3211 E 26TH ST)
End Street Name
2001151447
Run ID
E 26Th St
42
ID Sidewalk Width
Priority
feet 3.0-4.01.2 Cross Slope (PAR)SF162.8to $120 $1,96815453610ft
feet 2.0-3.05.3 Cross Slope (PAR)SF7812.9to $120 $9,34815453710ft
feet 3.0-4.015.5 Cross Slope (PAR)SF10625.8to $120 $12,66915453810ft
feet 5.0-6.032.3 Cross Slope (PAR)SF5637.8to $120 $6,76515453910ft
feet 5.0-6.044.5 Cross Slope (PAR)SF2747.1to $120 $3,19815454010ft
feet 2.0-3.048.8 Cross Slope (PAR)SF8657.2to $120 $10,33215454110ft
feet 3.0-4.061.0 Cross Slope (PAR)SF11772.4to $120 $14,02215454210ft
feet 2.0-3.072.9 Cross Slope (PAR)SF8080.7to $120 $9,59415454310ft
feet 3.0-4.083.8 Cross Slope (PAR)SF1685.4to $120 $1,96815454410ft
feet 2.0-3.090.4 Cross Slope (PAR)SF5996.2to $120 $7,13415454510ft
feet 4.0-5.096.3 Cross Slope (PAR)SF149110.8to $120 $17,83515454610ft
feet 2.0-3.0110.8 Cross Slope (PAR)SF18112.6to $120 $2,21415454710ft
feet 4.0-5.0113.6 Cross Slope (PAR)SF12114.8to $120 $1,47615454810ft
feet 2.0-3.0118.4 Cross Slope (PAR)SF16120.0to $120 $1,96815454910ft
feet .32119.3 Vertical Change REF10120.3to137484 10 ft
feet124.8 Driveway149.4to165748
feet 2.0-3.0164.3 Cross Slope (PAR)SF10165.3to $120 $1,23015455010ft
feet166.5 Driveway217.8to165749
feet 2.39219.5 Vertical Change REF10220.5to137485 10 ft
feet 2.0-3.0220.0 Cross Slope (PAR)SF38223.7to $120 $4,55115455110ft
feet 3.0-4.0229.5 Cross Slope (PAR)SF75236.8to $120 $8,97915455210ft
feet 2.0-3.0239.6 Cross Slope (PAR)SF15241.1to $120 $1,84515455310ft
feet 3.0-4.0243.4 Cross Slope (PAR)SF19245.3to $120 $2,33715455410ft
feet 2.0-3.0245.3 Cross Slope (PAR)SF135258.5to $120 $16,23615455510ft
feet 4.0-5.0259.8 Cross Slope (PAR)SF123271.8to $120 $14,76015455610ft
feet 4.0-5.0277.4 Cross Slope (PAR)SF110288.1to $120 $13,16115455710ft
feet 4.0-5.0294.1 Cross Slope (PAR)SF127306.5to $120 $15,25215455810ft
feet 3.0-4.0311.3 Cross Slope (PAR)SF33314.5to $120 $3,93615455910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
784
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
NE E 26TH ST
Street Side
TRAIN CROSSING (3305 E
26TH ST)
Survey Street Name Starting Street Name
TRAIN CROSSING (3211 E 26TH ST)
End Street Name
2001151447
Run ID
E 26Th St
42
ID Sidewalk Width
Priority
feet 3.0-4.0318.4 Cross Slope (PAR)SF47323.0to $120 $5,65815456010ft
feet 2.0-3.0323.5 Cross Slope (PAR)SF107333.9to $120 $12,79215456110ft
feet 4.0-5.0338.5 Cross Slope (PAR)SF45342.9to $120 $5,41215456210ft
feet 4.0-5.0345.0 Cross Slope (PAR)SF10346.0to $120 $1,23015456310ft
feet 4.0-5.0348.6 Cross Slope (PAR)SF103358.6to $120 $12,30015456410ft
feet 2.0-3.0359.8 Cross Slope (PAR)SF26362.3to $120 $3,07515456510ft
feet362.9 Driveway401.4to165750
feet 2.0-3.0402.2 Cross Slope (PAR)SF97411.7to $120 $11,68515456610ft
feet 6.0-7.0422.3 Cross Slope (PAR)SF25424.7to $120 $2,95215456710ft
feet 2.0-3.0428.3 Cross Slope (PAR)SF97437.8to $120 $11,68515456810ft
feet 2.0-3.0443.8 Cross Slope (PAR)SF96453.2to $120 $11,56215456910ft
feet 2.0-3.0456.1 Cross Slope (PAR)SF64462.3to $120 $7,62615457010ft
feet 4.0-5.0463.5 Cross Slope (PAR)SF36467.0to $120 $4,30515457110ft
feet 2.0-3.0468.7 Cross Slope (PAR)SF91477.6to $120 $10,94715457210ft
feet 2.0-3.0481.8 Cross Slope (PAR)SF33485.0to $120 $3,93615457310ft
feet 2.0-3.0492.6 Cross Slope (PAR)SF36496.1to $120 $4,30515457410ft
feet 2.0-3.0498.9 Cross Slope (PAR)SF30501.8to $120 $3,56715457510ft
feet 4.0-5.0508.8 Cross Slope (PAR)SF12510.0to $120 $1,47615457610ft
feet513.3 Driveway573.8to165751
$297,291.00TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING (3305 E 26TH
ST)
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
785
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW E 26TH ST
Street Side
TRAIN CROSSING BEFORE
S DOWNEY RD
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
2001151340
Run ID
E 26Th St
73
ID Sidewalk Width
Priority
feet 3.0-4.02.2 Cross Slope (PAR)SF53.3to $120 $5611547844ft
feet 2.0-3.03.6 Cross Slope (PAR)SF3912.7to $120 $4,6411547854ft
feet 3.0-4.017.6 Cross Slope (PAR)SF2323.1to $120 $2,8051547864ft
feet 5.0-6.024.3 Cross Slope (PAR)SF725.9to $120 $8161547874ft
feet .4124.5 Vertical Change REF425.5to137546 4 ft
feet 6.0-7.026.3 Cross Slope (PAR)SF627.8to $120 $7651547884ft
feet 4.0-5.028.3 Cross Slope (PAR)SF529.5to $120 $6121547894ft
feet 3.0-4.032.1 Cross Slope (PAR)SF2638.3to $120 $3,1621547904ft
feet -.8736.8 Vertical Change REF437.8to137547 4 ft
feet39.3 Driveway102.1to165768
feet -.3657.3 Vertical Change REF458.3to137548 4 ft
feet .2988.4 Vertical Change REF489.4to137549 4 ft
feet 5.0-6.0103.7 Cross Slope (PAR)SF4104.7to $120 $5101547914ft
feet 6.0-7.0112.9 Cross Slope (PAR)SF6114.3to $120 $7141547924ft
feet 5.0-6.0114.3 Cross Slope (PAR)SF20118.9to $120 $2,3461547934ft
feet 4.0-5.0121.1 Cross Slope (PAR)SF15124.7to $120 $1,8361547944ft
feet 5.0-6.0129.3 Cross Slope (PAR)SF11131.8to $120 $1,2751547954ft
feet 3.0-4.0135.1 Cross Slope (PAR)SF6136.4to $120 $6631547964ft
feet 2.0-3.0136.6 Cross Slope (PAR)SF61151.0to $120 $7,3441547974ft
feet158.8 Driveway177.1to165769
feet 3.0-4.0178.1 Cross Slope (PAR)SF4179.1to $120 $5101547984ft
feet 3.0-4.0181.8 Cross Slope (PAR)SF9183.8to $120 $1,0201547994ft
feet185.2 Cold Patch 14188.6to140523 4 ft
feet .34186.4 Vertical Change LF4187.4to $75 $3191375504ft
feet 2.0-3.0210.4 Cross Slope (PAR)SF8212.3to $120 $9691548004ft
feet 2.0-3.0224.1 Cross Slope (PAR)SF10226.4to $120 $1,1731548014ft
feet 2.0-3.0242.3 Cross Slope (PAR)SF14245.6to $120 $1,6831548024ft
feet -.42243.9 Vertical Change REF4244.9to137551 4 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
786
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
SW E 26TH ST
Street Side
TRAIN CROSSING BEFORE
S DOWNEY RD
Survey Street Name Starting Street Name
S DOWNEY RD
End Street Name
2001151340
Run ID
E 26Th St
73
ID Sidewalk Width
Priority
feet 2.0-3.0250.4 Cross Slope (PAR)SF34258.3to $120 $4,0291548034ft
feet .28310.4 Vertical Change REF4311.4to137553 4 ft
feet 2.0-3.0310.5 Cross Slope (PAR)SF5311.7to $120 $6121548044ft
feet 3.0-4.0314.8 Cross Slope (PAR)SF9316.8to $120 $1,0201548054ft
feet 2.0-3.0317.8 Cross Slope (PAR)SF6319.3to $120 $7651548064ft
feet 3.0-4.0321.7 Cross Slope (PAR)SF5322.8to $120 $5611548074ft
feet 2.0-3.0326.2 Cross Slope (PAR)SF11328.8to $120 $1,3261548084ft
$42,036.75TOTAL COST FOR:E 26TH STSWside of Starting at:TRAIN CROSSING BEFORE S
DOWNEY RD
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
787
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 27TH ST
Street Side
2200 E 27TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911211513
Run ID
E 27Th St
79.5
ID Sidewalk Width
Priority
feet 3.0-4.00.3 Cross Slope (PAR)SF151.9to $120 $1,7761417949ft
feet1.9 Driveway45.8to164569
feet 2.0-3.046.4 Cross Slope (Driveway)SF1648.1to $40 $6291417959ft
feet 3.0-4.050.2 Cross Slope (PAR)SF1051.3to $120 $1,2211417969ft
feet 2.0-3.051.8 Cross Slope (PAR)SF11664.3to $120 $13,8751417979ft
feet 4.0-5.064.3 Cross Slope (PAR)SF5169.8to $120 $6,1051417989ft
feet .5565.0 Vertical Change REF966.0to133480 9 ft
feet 3.0-4.072.0 Cross Slope (PAR)SF973.0to $120 $1,1101417999ft
feet 2.0-3.073.0 Cross Slope (PAR)SF1074.1to $120 $1,2211418009ft
feet 2.0-3.076.2 Cross Slope (PAR)SF3179.5to $120 $3,6631418019ft
feet 4.0-5.079.8 Cross Slope (PAR)SF14094.9to $120 $16,7611418029ft
feet 2.0-3.094.9 Cross Slope (PAR)SF204117.0to $120 $24,5311418039ft
feet 2.0-3.0120.4 Cross Slope (PAR)SF138135.3to $120 $16,5391418049ft
feet -.31127.9 Vertical Change REF9128.9to133481 9 ft
feet 4.0-5.0135.3 Cross Slope (PAR)SF27138.2to $120 $3,2191418059ft
feet 2.0-3.0143.8 Cross Slope (PAR)SF43148.5to $120 $5,2171418069ft
feet 4.0-5.0148.5 Cross Slope (PAR)SF17150.3to $120 $1,9981418079ft
feet 3.0-4.0152.4 Cross Slope (PAR)SF100163.2to $120 $11,9881418089ft
feet 2.0-3.0163.2 Cross Slope (PAR)SF37167.2to $120 $4,4401418099ft
feet 4.0-5.0167.2 Cross Slope (PAR)SF10168.3to $120 $1,2211418109ft
feet168.3 Driveway201.2to164570
feet -.69183.6 Vertical Change REF9184.6to133482 9 ft
feet .27196.5 Vertical Change REF9197.5to133483 9 ft
feet 2.0-3.0201.2 Cross Slope (Driveway)SF61207.8to $40 $2,4421418119ft
feet 4.0-5.0207.8 Cross Slope (PAR)SF166225.7to $120 $19,8691418129ft
feet 2.0-3.0226.5 Cross Slope (PAR)SF12227.8to $120 $1,4431418139ft
feet 2.0-3.0231.0 Cross Slope (PAR)SF22233.4to $120 $2,6641418149ft
feet 2.0-3.0241.3 Cross Slope (PAR)SF262269.6to $120 $31,4131418159ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
788
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 27TH ST
Street Side
2200 E 27TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911211513
Run ID
E 27Th St
79.5
ID Sidewalk Width
Priority
feet .32267.8 Vertical Change REF9268.8to133484 9 ft
feet 4.0-5.0269.8 Cross Slope (PAR)SF302302.4to $120 $36,1861418169ft
feet 2.0-3.0302.4 Cross Slope (PAR)SF46307.4to $120 $5,5501418179ft
feet 2.0-3.0312.5 Cross Slope (PAR)SF308345.8to $120 $36,9631418189ft
feet 3.0-4.0348.0 Cross Slope (PAR)SF40352.3to $120 $4,7731418199ft
feet 2.0-3.0352.3 Cross Slope (PAR)SF164370.0to $120 $19,6471418209ft
feet 2.0-3.0374.2 Cross Slope (PAR)SF44379.0to $120 $5,3281418219ft
feet .54376.2 Vertical Change REF9377.2to133485 9 ft
feet379.0 Driveway423.0to164571
feet -.32390.5 Vertical Change REF9391.5to133486 9 ft
feet -.29418.0 Vertical Change REF9419.0to133487 9 ft
feet 2.0-3.0427.3 Cross Slope (PAR)SF49432.6to $120 $5,8831418229ft
feet 1.13430.5 Vertical Change REF9431.5to133488 9 ft
feet 2.0-3.0435.7 Cross Slope (PAR)SF146451.5to $120 $17,5381418239ft
feet .75442.0 Vertical Change REF9443.0to133489 9 ft
feet 3.44451.1 Vertical Change REF9452.1to133490 9 ft
feet 2.0-3.0454.3 Cross Slope (PAR)SF46459.3to $120 $5,5501418249ft
feet .47460.3 Vertical Change LF9461.3to $75 $6941334919ft
feet 2.0-3.0466.1 Cross Slope (PAR)SF27469.0to $120 $3,2191418259ft
feet 2.0-3.0480.3 Cross Slope (PAR)SF106491.8to $120 $12,7651418269ft
feet491.8 Driveway543.0to164572
feet -.27500.8 Vertical Change REF9501.8to133492 9 ft
feet .33511.3 Vertical Change REF9512.3to133493 9 ft
feet 3.0-4.0543.5 Cross Slope (PAR)SF14545.0to $120 $1,6651418279ft
feet 3.11544.9 Vertical Change REF9545.9to133494 9 ft
feet 2.0-3.0545.2 Cross Slope (PAR)SF86554.5to $120 $10,3231418289ft
feet 4.0-5.0554.5 Cross Slope (PAR)SF66561.6to $120 $7,8811418299ft
feet 2.0-3.0561.6 Cross Slope (PAR)SF316595.8to $120 $37,9621418309ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
789
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 27TH ST
Street Side
2200 E 27TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911211513
Run ID
E 27Th St
79.5
ID Sidewalk Width
Priority
feet .48562.3 Vertical Change REF9563.3to133495 9 ft
feet 2.0-3.0601.8 Cross Slope (PAR)SF59608.2to $120 $7,1041418319ft
feet 4.0-5.0608.2 Cross Slope (PAR)SF71615.9to $120 $8,5471418329ft
feet 2.0-3.0615.9 Cross Slope (PAR)SF310649.4to $120 $37,1851418339ft
feet 4.0-5.0650.2 Cross Slope (PAR)SF234675.5to $120 $28,0831418349ft
feet 2.0-3.0675.5 Cross Slope (PAR)SF209698.1to $120 $25,0861418359ft
feet .78679.7 Vertical Change REF9680.7to133497 9 ft
feet 4.0-5.0698.1 Cross Slope (PAR)SF38702.2to $120 $4,5511418369ft
feet 2.0-3.0702.7 Cross Slope (PAR)SF181722.3to $120 $21,7561418379ft
feet .81703.2 Vertical Change REF9704.2to133498 9 ft
feet 3.14714.4 Vertical Change REF9715.4to133499 9 ft
feet 4.0-5.0722.3 Cross Slope (PAR)SF64729.2to $120 $7,6591418389ft
feet .37730.7 Vertical Change LF9731.7to $75 $6941335009ft
feet 2.0-3.0734.1 Cross Slope (PAR)SF33737.7to $120 $3,9961418399ft
feet .27736.4 Vertical Change REF9737.4to133501 9 ft
feet 6.0-7.0739.8 Cross Slope (PAR)SF16741.5to $120 $1,8871418409ft
feet 3.0-4.0743.7 Cross Slope (PAR)SF15745.3to $120 $1,7761418419ft
feet 3.0-4.0748.1 Cross Slope (PAR)SF84757.2to $120 $10,1011418429ft
feet 2.0-3.0758.6 Cross Slope (PAR)SF230783.5to $120 $27,6391418439ft
feet 4.0-5.0783.5 Cross Slope (PAR)SF43788.1to $120 $5,1061418449ft
feet 2.0-3.0788.3 Cross Slope (PAR)SF42792.8to $120 $4,9951418459ft
$581,436.50TOTAL COST FOR:E 27TH STSside of Starting at:2200 E 27TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
790
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 27TH ST
Street Side
2375 E 27TH ST
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1911211647
Run ID
E 27Th St
73
ID Sidewalk Width
Priority
feet 2.0-3.00.5 Cross Slope (PAR)SF374.2to $120 $4,44014148110ft
feet 4.0-5.04.2 Cross Slope (PAR)SF6610.8to $120 $7,92014148210ft
feet 3.0-4.013.4 Cross Slope (PAR)SF14027.4to $120 $16,80014148310ft
feet 2.0-3.027.4 Cross Slope (PAR)SF21148.5to $120 $25,32014148410ft
feet 2.0-3.050.8 Cross Slope (PAR)SF2152.9to $120 $2,52014148510ft
feet52.9 Driveway77.9to164541
feet 5.0-6.078.0 Cross Slope (Driveway)SF4882.8to $40 $1,92014148610ft
feet 3.0-4.083.1 Cross Slope (PAR)SF3186.2to $120 $3,72014148710ft
feet 5.0-6.086.2 Cross Slope (PAR)SF3489.6to $120 $4,08014148810ft
feet 3.0-4.089.6 Cross Slope (PAR)SF4594.1to $120 $5,40014148910ft
feet 5.0-6.094.1 Cross Slope (PAR)SF156109.7to $120 $18,72014149010ft
feet 3.0-4.0109.9 Cross Slope (PAR)SF101120.0to $120 $12,12014149110ft
feet 2.0-3.0120.0 Cross Slope (PAR)SF407160.7to $120 $48,84014149210ft
feet162.3 Driveway194.4to164542
feet 4.0-5.0194.7 Cross Slope (PAR)SF25197.2to $120 $3,00014149310ft
feet 2.0-3.0197.2 Cross Slope (PAR)SF292226.4to $120 $35,04014149410ft
feet227.1 Driveway252.6to164543
feet 5.0-6.0253.2 Cross Slope (Driveway)SF22255.4to $40 $88014149510ft
feet 3.0-4.0256.4 Cross Slope (PAR)SF184274.8to $120 $22,08014149610ft
feet 2.0-3.0274.8 Cross Slope (PAR)SF10275.8to $120 $1,20014149710ft
feet 2.0-3.0279.4 Cross Slope (PAR)SF15280.9to $120 $1,80014149810ft
feet282.3 Driveway314.6to164544
feet .26282.8 Vertical Change REF10283.8to133384 10 ft
feet -.43295.6 Vertical Change REF10296.6to133385 10 ft
feet 4.0-5.0314.8 Cross Slope (Driveway)SF105325.3to $40 $4,20014149910ft
feet 6.0-7.0327.3 Cross Slope (PAR)SF19329.2to $120 $2,28014150010ft
feet 5.0-6.0329.6 Cross Slope (PAR)SF28332.4to $120 $3,36014150110ft
feet 3.0-4.0333.2 Cross Slope (PAR)SF237356.9to $120 $28,44014150210ft
feet 2.0-3.0356.9 Cross Slope (PAR)SF173374.2to $120 $20,76014150310ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
791
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 27TH ST
Street Side
2375 E 27TH ST
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1911211647
Run ID
E 27Th St
73
ID Sidewalk Width
Priority
feet 2.0-3.0376.8 Cross Slope (PAR)SF30379.8to $120 $3,60014150410ft
feet 3.0-4.0382.8 Cross Slope (PAR)SF86391.4to $120 $10,32014150510ft
feet 2.9384.5 Vertical Change REF10385.5to133386 10 ft
feet 2.0-3.0391.4 Cross Slope (PAR)SF351426.5to $120 $42,12014150610ft
feet 3.0-4.0429.0 Cross Slope (PAR)SF71436.1to $120 $8,52014150710ft
feet 3.0-4.0438.9 Cross Slope (PAR)SF80446.9to $120 $9,60014150810ft
feet 2.0-3.0446.9 Cross Slope (PAR)SF162463.1to $120 $19,44014150910ft
feet 2.0-3.0466.0 Cross Slope (PAR)SF68472.8to $120 $8,16014151010ft
feet473.3 Driveway494.6to164545
feet .3492.0 Vertical Change REF10493.0to133387 10 ft
feet 3.0-4.0495.7 Cross Slope (PAR)SF34499.1to $120 $4,08014151110ft
feet 3.0-4.0501.5 Cross Slope (PAR)SF211522.6to $120 $25,32014151210ft
feet522.8 Driveway549.1to164546
feet -.28535.8 Vertical Change REF10536.8to133388 10 ft
feet 4.0-5.0549.6 Cross Slope (PAR)SF51554.7to $120 $6,12014151310ft
feet 2.0-3.0554.7 Cross Slope (PAR)SF338588.5to $120 $40,56014151410ft
feet 3.0-4.0590.7 Cross Slope (PAR)SF14592.1to $120 $1,68014151510ft
feet 2.0-3.0592.1 Cross Slope (PAR)SF329625.0to $120 $39,48014151610ft
feet 3.0-4.0628.2 Cross Slope (PAR)SF111639.3to $120 $13,32014151710ft
feet -.36629.0 Vertical Change REF10630.0to133390 10 ft
feet -.36634.5 Vertical Change REF10635.5to133391 10 ft
feet 5.0-6.0639.8 Cross Slope (PAR)SF40643.8to $120 $4,80014151810ft
feet 3.0-4.0645.6 Cross Slope (PAR)SF126658.2to $120 $15,12014151910ft
feet 2.0-3.0658.2 Cross Slope (PAR)SF51663.3to $120 $6,12014152010ft
$533,200.00TOTAL COST FOR:E 27TH STNside of Starting at:2375 E 27TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
792
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 27TH ST
Street Side
2443 E 27TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911221147
Run ID
E 27Th St
55.5
ID Sidewalk Width
Priority
feet 3.0-4.01.2 Cross Slope (PAR)SF223.5to $120 $2,62214251410ft
feet 2.0-3.03.5 Cross Slope (PAR)SF6510.3to $120 $7,75214251510ft
feet 4.0-5.010.3 Cross Slope (PAR)SF12123.0to $120 $14,47814251610ft
feet 2.0-3.023.0 Cross Slope (PAR)SF2325.4to $120 $2,73614251710ft
feet25.4 Driveway65.1to164660
feet 3.0-4.065.1 Cross Slope (Driveway)SF33099.8to $40 $13,18614251810ft
feet .3382.0 Vertical Change REF1083.0to133753 10 ft
feet 3.0-4.0102.6 Cross Slope (PAR)SF61109.0to $120 $7,29614251910ft
feet 5.0-6.0109.3 Cross Slope (PAR)SF53114.9to $120 $6,38414252010ft
feet 6.0-7.0115.3 Cross Slope (PAR)SF10116.3to $120 $1,14014252110ft
feet .29116.3 Vertical Change REF10117.3to133754 10 ft
feet 5.0-6.0116.3 Cross Slope (PAR)SF28119.2to $120 $3,30614252210ft
feet 3.0-4.0119.2 Cross Slope (PAR)SF19121.2to $120 $2,28014252310ft
feet 4.0-5.0125.3 Cross Slope (PAR)SF238150.3to $120 $28,50014252410ft
feet 2.0-3.0150.3 Cross Slope (PAR)SF69157.6to $120 $8,32214252510ft
feet 4.0-5.0157.6 Cross Slope (PAR)SF202178.9to $120 $24,28214252610ft
feet -.41172.2 Vertical Change REF10173.2to133755 10 ft
$122,284.00TOTAL COST FOR:E 27TH STNside of Starting at:2443 E 27TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
793
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 27TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1911211638
Run ID
E 27Th St
53
ID Sidewalk Width
Priority
feet 3.0-4.00.8 Cross Slope (PAR)SF947.3to $120 $11,31014152115ft
feet 2.0-3.07.3 Cross Slope (PAR)SF208.7to $120 $2,43614152215ft
feet 3.0-4.011.1 Cross Slope (PAR)SF12519.7to $120 $14,96414152315ft
feet 2.0-3.025.3 Cross Slope (PAR)SF3627.8to $120 $4,35014152415ft
feet 2.0-3.030.7 Cross Slope (PAR)SF4533.8to $120 $5,39414152515ft
feet 2.0-3.036.3 Cross Slope (PAR)SF5139.8to $120 $6,09014152615ft
feet 2.0-3.050.3 Cross Slope (PAR)SF37175.9to $120 $44,54414152715ft
feet .2666.1 Vertical Change LF1567.1to $75 $1,08813339215ft
feet 4.0-5.075.9 Cross Slope (PAR)SF13585.2to $120 $16,18214152815ft
feet -.3981.7 Vertical Change REF1582.7to133393 15 ft
feet 6.0-7.086.0 Cross Slope (PAR)SF1987.3to $120 $2,26214152915ft
feet 5.0-6.087.3 Cross Slope (PAR)SF13896.8to $120 $16,53014153015ft
feet -.2692.5 Vertical Change REF1593.5to133395 15 ft
feet 3.0-4.096.8 Cross Slope (PAR)SF318118.7to $120 $38,10614153115ft
$163,255.50TOTAL COST FOR:E 27TH STNside of Starting at:S SANTA FE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
794
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 27TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221119
Run ID
E 27Th St
49.5
ID Sidewalk Width
Priority
feet 2.0-3.02.2 Cross Slope (PAR)SF8910.9to $120 $10,70114259010ft
feet 3.0-4.013.2 Cross Slope (PAR)SF2215.3to $120 $2,58314259110ft
feet 2.0-3.015.3 Cross Slope (PAR)SF41355.6to $120 $49,56914259210ft
feet 2.0-3.060.8 Cross Slope (PAR)SF3063.7to $120 $3,56714259310ft
feet 4.0-5.063.7 Cross Slope (PAR)SF2966.5to $120 $3,44414259410ft
feet 2.0-3.066.5 Cross Slope (PAR)SF3369.7to $120 $3,93614259510ft
feet 4.0-5.070.3 Cross Slope (PAR)SF3173.3to $120 $3,69014259610ft
feet 2.0-3.073.8 Cross Slope (PAR)SF22795.9to $120 $27,18314259710ft
feet 4.0-5.096.7 Cross Slope (PAR)SF52101.8to $120 $6,27314259810ft
feet 2.0-3.0101.8 Cross Slope (PAR)SF68108.4to $120 $8,11814259910ft
feet 5.0-6.0111.5 Cross Slope (PAR)SF26114.0to $120 $3,07514260010ft
feet 3.0-4.0114.0 Cross Slope (PAR)SF13115.3to $120 $1,59914260110ft
feet 2.0-3.0115.3 Cross Slope (PAR)SF21117.3to $120 $2,46014260210ft
feet121.3 Driveway131.9to164675
feet .26122.2 Vertical Change REF10123.2to133784 10 ft
feet132.4 Driveway136.4to164676
feet 4.0-5.0136.8 Cross Slope (PAR)SF117148.2to $120 $14,02214260310ft
feet148.2 Driveway173.1to164677
feet 3.0-4.0174.0 Cross Slope (PAR)SF285201.8to $120 $34,19414260410ft
feet 2.0-3.0202.8 Cross Slope (PAR)SF273229.4to $120 $32,71814260510ft
feet .45203.0 Vertical Change REF10204.0to133785 10 ft
feet 4.0-5.0229.4 Cross Slope (PAR)SF10230.4to $120 $1,23014260610ft
feet231.8 Driveway258.5to164678
feet -.29248.2 Vertical Change REF10249.2to133786 10 ft
feet 3.0-4.0263.4 Cross Slope (PAR)SF92272.4to $120 $11,07014260710ft
feet -.31267.2 Vertical Change REF10268.2to133787 10 ft
feet .31271.6 Vertical Change REF10272.6to133788 10 ft
feet 2.0-3.0272.4 Cross Slope (PAR)SF89281.1to $120 $10,70114260810ft
feet 4.0-5.0281.5 Cross Slope (PAR)SF54286.8to $120 $6,51914260910ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
795
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 27TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221119
Run ID
E 27Th St
49.5
ID Sidewalk Width
Priority
feet287.6 Driveway306.7to164679
feet -.29305.9 Vertical Change REF10306.9to133790 10 ft
feet 2.0-3.0316.8 Cross Slope (PAR)SF36320.3to $120 $4,30514261010ft
feet321.3 Driveway366.7to164680
feet .27366.2 Vertical Change REF10367.2to133791 10 ft
feet 2.0-3.0367.5 Cross Slope (PAR)SF190386.0to $120 $22,75514261110ft
feet -.27383.7 Vertical Change REF10384.7to133792 10 ft
feet 4.0-5.0387.4 Cross Slope (PAR)SF165403.5to $120 $19,80314261210ft
feet -.37400.6 Vertical Change REF10401.6to133793 10 ft
feet 2.0-3.0404.1 Cross Slope (PAR)SF89412.8to $120 $10,70114261310ft
feet 4.0-5.0412.8 Cross Slope (PAR)SF160428.4to $120 $19,18814261410ft
feet428.4 Driveway449.9to164681
feet -.32436.0 Vertical Change REF10437.0to133794 10 ft
feet -.31449.4 Vertical Change REF10450.4to133795 10 ft
feet 3.0-4.0451.5 Cross Slope (PAR)SF39455.3to $120 $4,67414261510ft
feet 2.0-3.0455.7 Cross Slope (PAR)SF33458.9to $120 $3,93614261610ft
feet458.9 Driveway518.5to164682
feet 2.0-3.0519.3 Cross Slope (PAR)SF98528.9to $120 $11,80814261710ft
feet 2.0-3.0531.3 Cross Slope (PAR)SF152546.1to $120 $18,20414261810ft
feet 3.0-4.0549.7 Cross Slope (PAR)SF12550.9to $120 $1,47614261910ft
feet 4.0-5.0553.5 Cross Slope (PAR)SF16555.1to $120 $1,96814262010ft
feet556.5 Driveway580.8to164683
feet .38569.0 Vertical Change REF10570.0to133796 10 ft
feet -.26580.0 Vertical Change REF10581.0to133797 10 ft
$355,470.00TOTAL COST FOR:E 27TH STSside of Starting at:S SANTA FE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
796
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E E 27TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221137
Run ID
E 27Th St
72.75
ID Sidewalk Width
Priority
feet 2.0-3.012.8 Cross Slope (PAR)SF30945.3to $120 $37,05014253510ft
feet .2630.9 Vertical Change REF1031.9to133759 10 ft
feet 4.0-5.045.8 Cross Slope (PAR)SF4450.4to $120 $5,24414253610ft
feet 3.0-4.052.6 Cross Slope (PAR)SF11865.0to $120 $14,13614253710ft
feet 2.0-3.065.0 Cross Slope (PAR)SF20086.1to $120 $24,05414253810ft
feet86.1 Driveway111.8to164664
feet 3.0-4.0112.6 Cross Slope (PAR)SF41116.9to $120 $4,90214253910ft
feet 2.0-3.0116.9 Cross Slope (PAR)SF787199.7to $120 $94,39214254010ft
feet 4.0-5.0199.8 Cross Slope (PAR)SF216222.5to $120 $25,87814254110ft
feet 3.09204.0 Vertical Change REF10205.0to133760 10 ft
feet 2.0-3.0222.8 Cross Slope (PAR)SF45227.5to $120 $5,35814254210ft
feet227.6 Driveway250.6to164665
feet 2.0-3.0250.6 Cross Slope (Driveway)SF121263.3to $40 $4,82614254310ft
feet 2.0-3.0268.5 Cross Slope (PAR)SF138283.0to $120 $16,53014254410ft
feet 2.0-3.0287.3 Cross Slope (PAR)SF45292.0to $120 $5,35814254510ft
feet 4.0-5.0292.0 Cross Slope (PAR)SF621357.4to $120 $74,55614254610ft
feet .44317.1 Vertical Change REF10318.1to133761 10 ft
feet 2.0-3.0357.4 Cross Slope (PAR)SF182376.6to $120 $21,88814254710ft
feet .35375.9 Vertical Change REF10376.9to133762 10 ft
feet 4.0-5.0376.6 Cross Slope (PAR)SF22378.9to $120 $2,62214254810ft
feet 3.0-4.0381.2 Cross Slope (PAR)SF13382.6to $120 $1,59614254910ft
feet 3.0-4.0388.6 Cross Slope (PAR)SF111400.3to $120 $13,33814255010ft
feet 2.0-3.0408.2 Cross Slope (PAR)SF48413.2to $120 $5,70014255110ft
feet 4.0-5.0413.2 Cross Slope (PAR)SF165430.6to $120 $19,83614255210ft
feet 2.0-3.0430.6 Cross Slope (PAR)SF102441.3to $120 $12,19814255310ft
feet 2.0-3.0444.2 Cross Slope (PAR)SF24446.7to $120 $2,85014255410ft
feet 2.0-3.0449.2 Cross Slope (PAR)SF13450.6to $120 $1,59614255510ft
feet 2.0-3.0453.0 Cross Slope (PAR)SF36456.8to $120 $4,33214255610ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
797
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E E 27TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221137
Run ID
E 27Th St
72.75
ID Sidewalk Width
Priority
feet 4.0-5.0457.4 Cross Slope (PAR)SF156473.8to $120 $18,69614255710ft
feet 5.0-6.0466.2 Running Slope REF10467.3to166424 10 ft
feet473.8 Driveway501.5to164666
feet 3.0-4.0502.6 Cross Slope (PAR)SF54508.3to $120 $6,49814255810ft
feet .42504.1 Vertical Change REF10505.1to133763 10 ft
feet 2.0-3.0508.5 Cross Slope (PAR)SF70515.9to $120 $8,43614255910ft
feet 4.0-5.0516.6 Cross Slope (PAR)SF125529.8to $120 $15,04814256010ft
feet 2.0-3.0529.8 Cross Slope (PAR)SF214552.3to $120 $25,65014256110ft
feet 4.0-5.0553.0 Cross Slope (PAR)SF281582.6to $120 $33,74414256210ft
feet 2.86558.0 Vertical Change REF10559.0to133764 10 ft
feet586.4 Continuous Width SF10587.4to $120 $1,14016679610ft
feet 3.0-4.0588.4 Cross Slope (PAR)SF118600.8to $120 $14,13614256310ft
feet .3598.7 Vertical Change REF10599.7to133766 10 ft
feet601.1 Continuous Width REF10602.1to166868 10 ft
feet 4.0-5.0604.1 Cross Slope (PAR)SF37608.0to $120 $4,44614256410ft
feet608.0 Driveway652.6to164667
feet 4.0-5.0652.6 Cross Slope (Driveway)SF334687.8to $40 $13,37614256510ft
feet658.0 Continuous Width REF10659.0to166798 10 ft
feet -.28663.4 Vertical Change LF10664.4to $75 $71313376710ft
feet669.9 Continuous Width SF10670.9to $120 $1,14016679710ft
feet 2.12674.9 Vertical Change REF10675.9to133768 10 ft
feet 2.0-3.0687.8 Cross Slope (PAR)SF113699.7to $120 $13,56614256610ft
feet 3.0-4.0702.3 Cross Slope (PAR)SF88711.6to $120 $10,60214256710ft
feet 2.0-3.0711.6 Cross Slope (PAR)SF75719.5to $120 $9,00614256810ft
feet -.43718.7 Vertical Change REF10719.7to133769 10 ft
feet 5.0-6.0720.4 Cross Slope (PAR)SF13721.8to $120 $1,59614256910ft
feet .73721.0 Vertical Change REF10722.0to133770 10 ft
feet 4.0-5.0724.3 Cross Slope (PAR)SF84733.1to $120 $10,03214257010ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
798
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E E 27TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221137
Run ID
E 27Th St
72.75
ID Sidewalk Width
Priority
feet 2.0-3.0741.3 Cross Slope (PAR)SF61747.7to $120 $7,29614257110ft
feet 4.0-5.0753.0 Cross Slope (PAR)SF10754.0to $120 $1,14014257210ft
feet 4.0-5.0756.1 Cross Slope (PAR)SF48761.1to $120 $5,70014257310ft
feet 2.0-3.0766.2 Cross Slope (PAR)SF91775.8to $120 $10,94414257410ft
feet 3.0-4.0779.3 Cross Slope (PAR)SF85788.2to $120 $10,14614257510ft
feet 2.0-3.0788.2 Cross Slope (PAR)SF320821.9to $120 $38,41814257610ft
feet 4.0-5.0821.9 Cross Slope (PAR)SF78830.1to $120 $9,34814257710ft
feet 2.0-3.0830.1 Cross Slope (PAR)SF99840.5to $120 $11,85614257810ft
feet840.5 Driveway867.5to164668
feet 4.0-5.0867.8 Cross Slope (Driveway)SF174886.1to $40 $6,95414257910ft
feet -.27871.3 Vertical Change REF10872.3to133771 10 ft
feet .28878.0 Vertical Change REF10879.0to133772 10 ft
feet 2.0-3.0886.1 Cross Slope (PAR)SF333921.2to $120 $40,01414258010ft
feet -.5906.3 Vertical Change REF10907.3to133773 10 ft
feet 4.0-5.0921.2 Cross Slope (PAR)SF320954.9to $120 $38,41814258110ft
feet -.35923.9 Vertical Change REF10924.9to133774 10 ft
feet957.3 Driveway1035.4to164669
feet -.27968.7 Vertical Change REF10969.7to133775 10 ft
feet 4.0-5.01035.4 Cross Slope (Driveway)SF671042.5to $40 $2,69814258210ft
feet 4.0-5.01047.7 Cross Slope (PAR)SF601054.0to $120 $7,18214258310ft
feet 2.0-3.01054.0 Cross Slope (PAR)SF1021064.7to $120 $12,19814258410ft
feet .261056.4 Vertical Change REF101057.4to133776 10 ft
feet1064.7 Cold Patch 351068.4to140266 10 ft
feet1068.9 Driveway1089.8to164670
feet .331088.3 Vertical Change REF101089.3to133777 10 ft
feet .921090.0 Vertical Change REF101091.0to133778 10 ft
feet 4.0-5.01092.8 Cross Slope (PAR)SF1421107.7to $120 $16,98614258510ft
feet1107.8 Driveway1189.1to164671
feet -.471136.0 Vertical Change REF101137.0to133779 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
799
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
E E 27TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
TRAIN CROSSING
End Street Name
1911221137
Run ID
E 27Th St
72.75
ID Sidewalk Width
Priority
feet .271148.7 Vertical Change REF101149.7to133780 10 ft
feet .281179.4 Vertical Change REF101180.4to133781 10 ft
feet 3.0-4.01189.7 Cross Slope (PAR)SF331193.2to $120 $3,99014258610ft
feet 5.0-6.01193.2 Cross Slope (PAR)SF221195.5to $120 $2,62214258710ft
feet1195.5 Driveway1214.7to164672
feet .451206.3 Vertical Change REF101207.3to133782 10 ft
feet -.521215.5 Vertical Change REF101216.5to133783 10 ft
feet 4.0-5.01216.3 Cross Slope (PAR)SF1001226.8to $120 $11,97014258810ft
feet1226.8 Driveway1242.9to164673
feet1226.8 Driveway1246.1to164674
feet 3.0-4.01244.8 Cross Slope (Driveway)SF101245.9to $40 $41814258910ft
$824,362.50TOTAL COST FOR:E 27TH STEside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
800
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 27TH ST
Street Side
TRAIN CROSSING
Survey Street Name Starting Street Name
2455 E 27TH ST
End Street Name
1911221142
Run ID
E 27Th St
51
ID Sidewalk Width
Priority
feet 2.0-3.05.2 Cross Slope (PAR)SF18624.8to $120 $22,34414252710ft
feet -.2812.9 Vertical Change REF1013.9to133756 10 ft
feet 2.0-3.027.8 Cross Slope (PAR)SF16044.6to $120 $19,15214252810ft
feet .2940.2 Vertical Change REF941.2to133757 10 ft
feet44.6 Driveway81.9to164661
feet 2.0-3.081.9 Cross Slope (Driveway)SF5687.8to $40 $2,24214252910ft
feet 4.0-5.087.8 Cross Slope (PAR)SF8997.2to $120 $10,71614253010ft
feet 2.0-3.097.8 Cross Slope (PAR)SF158114.4to $120 $18,92414253110ft
feet114.4 Driveway144.9to164662
feet 3.0-4.0145.5 Cross Slope (PAR)SF105156.6to $120 $12,65414253210ft
feet 1.43156.3 Vertical Change REF10157.3to133758 10 ft
feet 3.0-4.0159.0 Cross Slope (PAR)SF18160.9to $120 $2,16614253310ft
feet 2.0-3.0161.7 Cross Slope (PAR)SF62168.2to $120 $7,41014253410ft
feet168.3 Driveway214.5to164663
$95,608.00TOTAL COST FOR:E 27TH STNside of Starting at:TRAIN CROSSING
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
801
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 28TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912021443
Run ID
E 28Th St
55.5
ID Sidewalk Width
Priority
feet -.321.9 Vertical Change LF92.9to $75 $6941383829ft
feet 2.0-3.08.9 Cross Slope (PAR)SF10119.8to $120 $12,0991589289ft
feet20.2 Driveway48.0to166016
feet -.2636.8 Vertical Change REF937.8to138383 9 ft
feet 2.0-3.069.5 Cross Slope (PAR)SF1370.9to $120 $1,5541589299ft
feet 2.0-3.073.9 Cross Slope (PAR)SF4578.8to $120 $5,4391589309ft
feet 2.0-3.0104.2 Cross Slope (PAR)SF13105.6to $120 $1,5541589319ft
feet 2.0-3.0109.8 Cross Slope (PAR)SF128123.6to $120 $15,3181589329ft
feet124.6 Driveway145.1to166017
feet -.27133.4 Vertical Change REF9134.4to138384 9 ft
feet 2.0-3.0160.7 Cross Slope (PAR)SF14162.2to $120 $1,6651589339ft
feet 2.0-3.0166.8 Cross Slope (PAR)SF46171.8to $120 $5,5501589349ft
feet -.31170.8 Vertical Change REF9171.8to138385 9 ft
feet 2.0-3.0177.8 Cross Slope (PAR)SF62184.5to $120 $7,4371589359ft
feet 3.0-4.0188.7 Cross Slope (PAR)SF17190.5to $120 $1,9981589369ft
feet190.5 Driveway226.8to166018
feet -.48202.8 Vertical Change REF9203.8to138386 9 ft
feet 3.0-4.0226.8 Cross Slope (Driveway)SF189247.2to $40 $7,5481589379ft
feet -.36244.0 Vertical Change REF9245.0to138387 9 ft
feet 2.0-3.0247.4 Cross Slope (PAR)SF91257.2to $120 $10,8781589389ft
feet259.0 Driveway288.2to166019
feet -.41259.2 Vertical Change REF9260.2to138388 9 ft
feet -.35287.5 Vertical Change REF9288.5to138389 9 ft
feet 2.0-3.0288.6 Cross Slope (PAR)SF57294.8to $120 $6,8821589399ft
feet 2.0-3.0298.0 Cross Slope (PAR)SF13299.4to $120 $1,5541589409ft
feet 2.0-3.0308.4 Cross Slope (PAR)SF13309.8to $120 $1,5541589419ft
feet 2.0-3.0312.3 Cross Slope (PAR)SF111324.3to $120 $13,3201589429ft
feet325.3 Driveway360.8to166020
feet 2.0-3.0365.1 Cross Slope (PAR)SF9366.1to $120 $1,1101589439ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
802
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 28TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912021443
Run ID
E 28Th St
55.5
ID Sidewalk Width
Priority
feet 2.0-3.0371.3 Cross Slope (PAR)SF41375.7to $120 $4,8841589449ft
feet376.8 Driveway407.3to166021
feet .46377.5 Vertical Change REF9378.5to138390 9 ft
feet .27397.7 Vertical Change REF9398.7to138391 9 ft
feet 2.0-3.0408.8 Cross Slope (PAR)SF97419.3to $120 $11,6551589459ft
feet -.48416.5 Vertical Change REF9417.5to138392 9 ft
feet 4.0-5.0422.2 Cross Slope (PAR)SF185442.2to $120 $22,2001589469ft
feet 2.0-3.0442.5 Cross Slope (PAR)SF181462.1to $120 $21,7561589479ft
feet .28455.7 Vertical Change REF9456.7to138393 9 ft
feet 4.0-5.0462.9 Cross Slope (PAR)SF55468.8to $120 $6,5491589489ft
feet 2.0-3.0469.7 Cross Slope (PAR)SF91479.5to $120 $10,8781589499ft
feet 4.0-5.0479.8 Cross Slope (PAR)SF32483.3to $120 $3,8851589509ft
feet 2.0-3.0483.3 Cross Slope (PAR)SF25486.0to $120 $2,9971589519ft
feet 2.0-3.0489.3 Cross Slope (PAR)SF76497.5to $120 $9,1021589529ft
feet 3.0-4.0501.3 Cross Slope (PAR)SF12502.6to $120 $1,4431589539ft
feet503.0 Driveway535.1to166022
feet .27510.3 Vertical Change REF9511.3to138394 9 ft
feet 2.0-3.0535.2 Cross Slope (Driveway)SF100546.0to $40 $3,9961589549ft
feet .7544.4 Vertical Change REF9545.4to138395 9 ft
feet .36549.0 Vertical Change LF9550.0to $75 $6941383969ft
feet 2.0-3.0550.7 Cross Slope (PAR)SF76558.9to $120 $9,1021589559ft
feet 2.0-3.0564.8 Cross Slope (PAR)SF29567.9to $120 $3,4411589569ft
feet 2.0-3.0570.5 Cross Slope (PAR)SF15572.1to $120 $1,7761589579ft
feet576.0 Cold Patch 241602.0to140566 9 ft
feet .7576.7 Vertical Change SF9577.7to $75 $6941383979ft
feet -.39600.4 Vertical Change LF9601.4to $75 $6941383989ft
feet 3.0-4.0602.0 Cross Slope (PAR)SF13603.4to $120 $1,5541589589ft
feet 2.0-3.0603.4 Cross Slope (PAR)SF162620.9to $120 $19,4251589599ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
803
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 28TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912021443
Run ID
E 28Th St
55.5
ID Sidewalk Width
Priority
feet 4.0-5.0621.2 Cross Slope (PAR)SF243647.5to $120 $29,1931589609ft
feet .3642.5 Vertical Change REF9643.5to138399 9 ft
feet647.5 Driveway680.3to166023
feet 3.0-4.0681.1 Cross Slope (PAR)SF48686.3to $120 $5,7721589619ft
feet .29690.2 Vertical Change REF9691.2to138400 9 ft
feet 3.0-4.0690.3 Cross Slope (PAR)SF19692.3to $120 $2,2201589629ft
feet 2.0-3.0692.3 Cross Slope (PAR)SF145708.0to $120 $17,4271589639ft
feet .29703.1 Vertical Change REF9704.1to138401 9 ft
feet 4.0-5.0708.0 Cross Slope (PAR)SF30711.2to $120 $3,5521589649ft
feet 2.0-3.0711.2 Cross Slope (PAR)SF10712.3to $120 $1,2211589659ft
feet 3.0-4.0714.6 Cross Slope (PAR)SF265743.3to $120 $31,8571589669ft
feet744.5 Driveway783.4to166024
feet 2.0-3.0784.8 Cross Slope (PAR)SF63791.6to $120 $7,5481589679ft
feet 4.0-5.0791.6 Cross Slope (PAR)SF34795.3to $120 $4,1071589689ft
feet 2.0-3.0795.6 Cross Slope (PAR)SF43800.3to $120 $5,2171589699ft
feet 2.0-3.0802.7 Cross Slope (PAR)SF765885.4to $120 $91,7971589709ft
feet 4.0-5.0885.4 Cross Slope (PAR)SF95895.7to $120 $11,4331589719ft
feet 2.0-3.0897.0 Cross Slope (PAR)SF21899.3to $120 $2,5531589729ft
feet 2.0-3.0901.7 Cross Slope (PAR)SF51907.2to $120 $6,1051589739ft
feet 3.0-4.0911.9 Cross Slope (PAR)SF33915.5to $120 $3,9961589749ft
feet .32913.1 Vertical Change REF9914.1to138402 9 ft
feet 2.0-3.0915.5 Cross Slope (PAR)SF293947.2to $120 $35,1871589759ft
feet947.2 Driveway985.7to166025
feet 3.0-4.0986.1 Cross Slope (Driveway)SF2601014.2to $40 $10,3971589769ft
feet 2.0-3.01014.2 Cross Slope (PAR)SF151015.8to $120 $1,7761589779ft
feet 2.0-3.01026.5 Cross Slope (PAR)SF1511042.8to $120 $18,0931589789ft
feet 3.0-4.01047.2 Cross Slope (PAR)SF421051.7to $120 $4,9951589799ft
feet 5.0-6.01052.8 Cross Slope (PAR)SF651059.8to $120 $7,7701589809ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
804
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 28TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912021443
Run ID
E 28Th St
55.5
ID Sidewalk Width
Priority
feet 3.0-4.01059.8 Cross Slope (PAR)SF1241073.2to $120 $14,8741589819ft
feet 2.0-3.01074.0 Cross Slope (PAR)SF1091085.8to $120 $13,0981589829ft
feet .261075.4 Vertical Change REF91076.4to138403 9 ft
feet .821079.1 Vertical Change REF91080.1to138404 9 ft
feet .411081.6 Vertical Change REF91082.6to138405 9 ft
feet 4.0-5.01086.6 Cross Slope (PAR)SF481091.8to $120 $5,7721589839ft
feet 2.0-3.01091.8 Cross Slope (PAR)SF431096.4to $120 $5,1061589849ft
feet 4.0-5.01097.9 Cross Slope (PAR)SF2101120.6to $120 $25,1971589859ft
feet .351117.6 Vertical Change REF91118.6to138406 9 ft
feet 4.0-5.01123.1 Cross Slope (PAR)SF3921165.5to $120 $47,0641589869ft
feet 2.0-3.01165.7 Cross Slope (PAR)SF891175.3to $120 $10,6561589879ft
feet 4.0-5.01176.3 Cross Slope (PAR)SF651183.3to $120 $7,7701589889ft
feet 2.0-3.01186.4 Cross Slope (PAR)SF291189.5to $120 $3,4411589899ft
feet .931187.6 Vertical Change REF91188.6to138408 9 ft
feet 3.0-4.01191.8 Cross Slope (PAR)SF141193.3to $120 $1,6651589909ft
feet 2.0-3.01193.6 Cross Slope (PAR)SF671200.8to $120 $7,9921589919ft
feet1200.8 Driveway1242.9to166026
feet 2.0-3.01243.8 Cross Slope (PAR)SF1391258.8to $120 $16,6501589929ft
$694,379.00TOTAL COST FOR:E 28TH STSside of Starting at:S SANTA FE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
805
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 28TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912021334
Run ID
E 28Th St
62.75
ID Sidewalk Width
Priority
feet 2.0-3.00.0 Cross Slope (PAR)SF586.3to $120 $6,9931591519ft
feet 2.0-3.08.8 Cross Slope (PAR)SF38750.6to $120 $46,3981591529ft
feet .434.3 Vertical Change REF935.3to138466 9 ft
feet .3141.9 Vertical Change REF942.9to138467 9 ft
feet50.6 Driveway84.8to166040
feet .369.8 Vertical Change REF970.8to138468 9 ft
feet 3.0-4.085.4 Cross Slope (Driveway)SF3188.7to $40 $1,2211591539ft
feet 2.0-3.089.4 Cross Slope (PAR)SF5995.8to $120 $7,1041591549ft
feet 4.0-5.095.8 Cross Slope (PAR)SF100106.6to $120 $11,9881591559ft
feet 2.0-3.0106.6 Cross Slope (PAR)SF80115.2to $120 $9,5461591569ft
feet 4.0-5.0115.2 Cross Slope (PAR)SF526172.1to $120 $63,1591591579ft
feet172.6 Driveway195.8to166041
feet .33182.4 Vertical Change REF9183.4to138469 9 ft
feet 3.0-4.0195.8 Cross Slope (Driveway)SF427242.0to $40 $17,0941591589ft
feet .92201.7 Vertical Change REF9202.7to138470 9 ft
feet .27223.5 Vertical Change REF9224.5to138471 9 ft
feet242.0 Driveway270.3to166042
feet 3.0-4.0270.3 Cross Slope (Driveway)SF145286.0to $40 $5,8091591599ft
feet 2.0-3.0286.0 Cross Slope (PAR)SF17287.8to $120 $1,9981591609ft
feet 2.0-3.0290.0 Cross Slope (PAR)SF216313.4to $120 $25,9741591619ft
feet 3.11308.3 Vertical Change SF9309.3to $75 $6941384729ft
feet 2.0-3.0315.8 Cross Slope (PAR)SF32319.3to $120 $3,8851591629ft
feet319.3 Driveway346.9to166043
feet 2.0-3.0347.9 Cross Slope (PAR)SF170366.3to $120 $20,4241591639ft
feet366.3 Driveway386.8to166044
feet 4.0-5.0386.8 Cross Slope (Driveway)SF59393.2to $40 $2,3681591649ft
feet -.28394.8 Vertical Change LF9395.8to $75 $6941384739ft
feet 5.0-6.0396.1 Cross Slope (PAR)SF37400.1to $120 $4,4401591659ft
feet .37396.9 Vertical Change REF9397.9to138474 9 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
806
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 28TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912021334
Run ID
E 28Th St
62.75
ID Sidewalk Width
Priority
feet 3.0-4.0400.3 Cross Slope (PAR)SF26403.1to $120 $3,1081591669ft
feet 2.0-3.0403.3 Cross Slope (PAR)SF28406.3to $120 $3,3301591679ft
feet 4.0-5.0406.9 Cross Slope (PAR)SF28409.9to $120 $3,3301591689ft
feet 2.0-3.0409.9 Cross Slope (PAR)SF48415.1to $120 $5,7721591699ft
feet 4.0-5.0415.1 Cross Slope (PAR)SF35418.9to $120 $4,2181591709ft
feet 2.0-3.0420.7 Cross Slope (PAR)SF266449.5to $120 $31,9681591719ft
feet -.4437.7 Vertical Change REF9438.7to138475 9 ft
feet 4.0-5.0449.5 Cross Slope (PAR)SF45454.4to $120 $5,4391591729ft
feet 2.0-3.0454.4 Cross Slope (PAR)SF27457.3to $120 $3,2191591739ft
feet 4.0-5.0459.1 Cross Slope (PAR)SF49464.4to $120 $5,8831591749ft
feet 2.0-3.0464.4 Cross Slope (PAR)SF97474.9to $120 $11,6551591759ft
feet 4.0-5.0475.3 Cross Slope (PAR)SF45480.2to $120 $5,4391591769ft
feet 2.0-3.0480.5 Cross Slope (PAR)SF53486.2to $120 $6,3271591779ft
feet 4.0-5.0489.9 Cross Slope (PAR)SF84499.0to $120 $10,1011591789ft
feet -.34498.0 Vertical Change REF9499.0to138476 9 ft
feet 2.0-3.0512.6 Cross Slope (PAR)SF20514.8to $120 $2,4421591799ft
feet 2.02519.0 Vertical Change SF9520.0to $75 $6941384779ft
feet 2.0-3.0531.0 Cross Slope (PAR)SF187551.2to $120 $22,4221591809ft
feet 2.0-3.0553.5 Cross Slope (PAR)SF132567.8to $120 $15,8731591819ft
feet .27558.2 Vertical Change REF9559.2to138478 9 ft
feet 4.0-5.0567.8 Cross Slope (PAR)SF163585.4to $120 $19,5361591829ft
feet 4.0-5.0587.6 Cross Slope (PAR)SF191608.3to $120 $22,9771591839ft
feet 2.0-3.0608.3 Cross Slope (PAR)SF14609.8to $120 $1,6651591849ft
feet609.8 Driveway627.6to166045
feet -.46611.2 Vertical Change REF9612.2to138479 9 ft
feet 2.0-3.0629.2 Cross Slope (PAR)SF19631.3to $120 $2,3311591859ft
feet 3.0-4.0634.1 Cross Slope (PAR)SF82643.0to $120 $9,8791591869ft
feet 2.0-3.0643.7 Cross Slope (PAR)SF23646.2to $120 $2,7751591879ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
807
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 28TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912021334
Run ID
E 28Th St
62.75
ID Sidewalk Width
Priority
feet .33648.2 Vertical Change LF9649.2to $75 $6941384809ft
feet 2.0-3.0651.5 Cross Slope (PAR)SF12652.8to $120 $1,4431591889ft
feet662.8 Cold Patch 0662.8to140568 9 ft
feet 2.0-3.0663.9 Cross Slope (PAR)SF23666.4to $120 $2,7751591899ft
feet .26674.9 Vertical Change LF9675.9to $75 $6941384819ft
feet 2.0-3.0680.3 Cross Slope (PAR)SF13681.7to $120 $1,5541591909ft
feet 2.0-3.0686.2 Cross Slope (PAR)SF29689.3to $120 $3,4411591919ft
feet 7.0-8.0687.4 Running Slope REF16689.1to166635 9 ft
feet -.35688.5 Vertical Change REF9689.5to138482 9 ft
feet690.1 Driveway710.8to166046
feet -.46717.9 Vertical Change REF9718.9to138483 9 ft
feet 4.0-5.0717.9 Cross Slope (PAR)SF45722.8to $120 $5,4391591929ft
feet 2.0-3.0722.8 Cross Slope (PAR)SF23725.3to $120 $2,7751591939ft
feet 2.0-3.0731.6 Cross Slope (PAR)SF413776.3to $120 $49,6171591949ft
feet 2.0-3.0779.8 Cross Slope (PAR)SF16781.5to $120 $1,8871591959ft
feet 3.0-4.0786.6 Cross Slope (PAR)SF15788.2to $120 $1,7761591969ft
feet 2.0-3.0788.2 Cross Slope (PAR)SF99798.9to $120 $11,8771591979ft
feet 2.0-3.0801.1 Cross Slope (PAR)SF215824.3to $120 $25,7521591989ft
feet 2.0-3.0826.6 Cross Slope (PAR)SF140841.7to $120 $16,7611591999ft
feet 3.0-4.0843.8 Cross Slope (PAR)SF37847.8to $120 $4,4401592009ft
feet 2.0-3.0847.8 Cross Slope (PAR)SF116860.3to $120 $13,8751592019ft
feet 3.0-4.0862.8 Cross Slope (PAR)SF56868.8to $120 $6,6601592029ft
feet 2.0-3.0869.0 Cross Slope (PAR)SF120882.0to $120 $14,4301592039ft
feet 2.0-3.0885.8 Cross Slope (PAR)SF228910.5to $120 $27,4171592049ft
feet -.31894.1 Vertical Change REF9895.1to138484 9 ft
feet 2.0-3.0913.3 Cross Slope (PAR)SF72921.1to $120 $8,6581592059ft
feet 2.0-3.0925.0 Cross Slope (PAR)SF343962.1to $120 $41,1811592069ft
feet .26952.0 Vertical Change REF9953.0to138485 9 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
808
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 28TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912021334
Run ID
E 28Th St
62.75
ID Sidewalk Width
Priority
feet 3.0-4.0964.7 Cross Slope (PAR)SF11965.9to $120 $1,3321592079ft
feet 2.0-3.0966.4 Cross Slope (PAR)SF89976.0to $120 $10,6561592089ft
feet 4.0-5.0976.0 Cross Slope (PAR)SF35979.8to $120 $4,2181592099ft
feet 4.0-5.0982.1 Cross Slope (PAR)SF2491009.0to $120 $29,8591592109ft
feet -.31005.0 Vertical Change REF91006.0to138486 9 ft
feet 2.0-3.01009.0 Cross Slope (PAR)SF2411035.0to $120 $28,8601592119ft
feet 4.0-5.01035.0 Cross Slope (PAR)SF1881055.3to $120 $22,5331592129ft
feet .261038.3 Vertical Change REF91039.3to138487 9 ft
feet -.431054.5 Vertical Change REF91055.5to138488 9 ft
feet 2.0-3.01055.6 Cross Slope (PAR)SF111056.8to $120 $1,3321592139ft
feet .361056.7 Vertical Change REF91057.7to138489 9 ft
feet 2.0-3.01066.3 Cross Slope (PAR)SF581072.6to $120 $6,9931592149ft
feet 4.0-5.01072.6 Cross Slope (PAR)SF431077.2to $120 $5,1061592159ft
feet 2.0-3.01077.2 Cross Slope (PAR)SF2951109.1to $120 $35,4091592169ft
feet -.321078.1 Vertical Change REF91079.1to138490 9 ft
feet -.351095.3 Vertical Change REF91096.3to138491 9 ft
feet 3.0-4.01111.6 Cross Slope (PAR)SF251114.3to $120 $2,9971592179ft
feet 3.0-4.01118.3 Cross Slope (PAR)SF221120.7to $120 $2,6641592189ft
feet 2.0-3.01120.7 Cross Slope (PAR)SF691128.2to $120 $8,3251592199ft
feet1128.8 Driveway1145.1to166047
feet 2.0-3.01148.8 Cross Slope (PAR)SF1341163.3to $120 $16,0951592209ft
feet 2.0-3.01166.0 Cross Slope (PAR)SF1041177.2to $120 $12,4321592219ft
feet 2.0-3.01180.2 Cross Slope (PAR)SF151181.8to $120 $1,7761592229ft
feet 2.0-3.01205.6 Cross Slope (PAR)SF271208.5to $120 $3,2191592239ft
feet 2.0-3.01213.0 Cross Slope (PAR)SF301216.2to $120 $3,5521592249ft
feet 2.0-3.01222.9 Cross Slope (PAR)SF131224.3to $120 $1,5541592259ft
feet 2.0-3.01232.8 Cross Slope (PAR)SF191234.8to $120 $2,2201592269ft
feet 2.0-3.01248.3 Cross Slope (PAR)SF101249.4to $120 $1,2211592279ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
809
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 28TH ST
Street Side
SIDEWALK BEGINS
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912021334
Run ID
E 28Th St
62.75
ID Sidewalk Width
Priority
feet 2.0-3.01254.3 Cross Slope (PAR)SF131255.7to $120 $1,5541592289ft
$877,223.75TOTAL COST FOR:E 28TH STNside of Starting at:SIDEWALK BEGINS
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
810
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 30TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912021414
Run ID
E 30Th St
55.75
ID Sidewalk Width
Priority
feet 2.0-3.010.0 Cross Slope (PAR)SF2813.0to $120 $3,3301590359ft
feet 2.0-3.017.1 Cross Slope (PAR)SF10027.9to $120 $11,9881590369ft
feet -.327.9 Vertical Change REF928.9to138422 9 ft
feet 3.0-4.030.6 Cross Slope (PAR)SF12243.8to $120 $14,6521590379ft
feet 2.0-3.044.3 Cross Slope (PAR)SF6351.1to $120 $7,5481590389ft
feet 2.0-3.055.1 Cross Slope (PAR)SF2057.3to $120 $2,4421590399ft
feet 2.0-3.060.2 Cross Slope (PAR)SF5065.6to $120 $5,9941590409ft
feet 2.0-3.068.8 Cross Slope (PAR)SF3772.8to $120 $4,4401590419ft
feet -.3969.0 Vertical Change REF970.0to138423 9 ft
feet 2.0-3.088.8 Cross Slope (PAR)SF106100.3to $120 $12,7651590429ft
feet .2891.7 Vertical Change REF3195.0to138424 9 ft
feet 2.0-3.0102.8 Cross Slope (PAR)SF38106.9to $120 $4,5511590439ft
feet 8.0-9.0106.0 Running Slope REF12107.3to166634 9 ft
feet 2.0-3.0112.2 Cross Slope (PAR)SF13113.6to $120 $1,5541590449ft
feet 2.0-3.0117.3 Cross Slope (PAR)SF60123.8to $120 $7,2151590459ft
feet124.8 Cold Patch 0124.8to140567 9 ft
feet .27127.6 Vertical Change LF9128.6to $75 $6941384259ft
feet .26131.4 Vertical Change LF9132.4to $75 $6941384269ft
feet 2.0-3.0133.4 Cross Slope (PAR)SF13134.8to $120 $1,5541590469ft
feet .59135.6 Vertical Change SF9136.6to $75 $6941384279ft
feet141.3 Driveway232.5to166030
feet -.27175.4 Vertical Change REF9176.4to138428 9 ft
feet .36178.3 Vertical Change REF9179.3to138429 9 ft
feet -.26186.2 Vertical Change REF9187.2to138430 9 ft
feet -.28191.6 Vertical Change REF9192.6to138431 9 ft
feet -.29202.2 Vertical Change REF9203.2to138432 9 ft
feet .29231.6 Vertical Change REF9232.6to138433 9 ft
feet 3.0-4.0232.6 Cross Slope (PAR)SF11233.8to $120 $1,3321590479ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
811
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 30TH ST
Street Side
S SANTA FE AVE
Survey Street Name Starting Street Name
SIDEWALK ENDS
End Street Name
1912021414
Run ID
E 30Th St
55.75
ID Sidewalk Width
Priority
feet 2.0-3.0233.8 Cross Slope (PAR)SF447282.1to $120 $53,6131590489ft
feet 2.0-3.0286.8 Cross Slope (PAR)SF77295.1to $120 $9,2131590499ft
feet 4.0-5.0295.3 Cross Slope (PAR)SF21297.6to $120 $2,5531590509ft
feet -.45295.8 Vertical Change REF30299.0to138434 9 ft
feet298.6 Driveway385.2to166031
feet -.3304.8 Vertical Change REF9305.8to138435 9 ft
feet -.38357.3 Vertical Change REF9358.3to138436 9 ft
feet .3362.4 Vertical Change REF9363.4to138437 9 ft
feet .3376.6 Vertical Change REF9377.6to138439 9 ft
$146,825.25TOTAL COST FOR:E 30TH STSside of Starting at:S SANTA FE AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
812
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 37TH ST
Street Side
2350 E 37TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1911211055
Run ID
E 37Th St
53
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF868.8to $120 $10,29614226710ft
feet .31.0 Vertical Change REF102.0to133659 10 ft
feet 2.0-3.08.8 Cross Slope (PAR)SF4113.0to $120 $4,91414226810ft
feet13.2 Driveway32.1to164618
feet 2.0-3.032.9 Cross Slope (PAR)SF11044.2to $120 $13,22114226910ft
feet44.3 Driveway58.2to164619
feet 3.0-4.059.3 Cross Slope (PAR)SF2061.4to $120 $2,45714227010ft
feet 2.0-3.061.4 Cross Slope (PAR)SF17579.3to $120 $20,94314227110ft
feet 2.0-3.081.8 Cross Slope (PAR)SF6988.9to $120 $8,30714227210ft
feet 3.0-4.091.6 Cross Slope (PAR)SF90100.8to $120 $10,76414227310ft
feet 2.0-3.0101.2 Cross Slope (PAR)SF11102.3to $120 $1,28714227410ft
feet 2.0-3.0106.1 Cross Slope (PAR)SF50111.2to $120 $5,96714227510ft
feet 4.0-5.0111.8 Cross Slope (PAR)SF65118.5to $120 $7,83914227610ft
$85,995.00TOTAL COST FOR:E 37TH STSside of Starting at:2350 E 37TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
813
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912030948
Run ID
E 37Th St
96
ID Sidewalk Width
Priority
feet 2.0-3.016.3 Cross Slope (PAR)SF2519.8to $120 $3,0451604667ft
feet 4.0-5.019.8 Cross Slope (PAR)SF7029.4to $120 $8,3521604677ft
feet 2.0-3.029.4 Cross Slope (PAR)SF6738.6to $120 $8,0041604687ft
feet 4.0-5.040.7 Cross Slope (PAR)SF10955.8to $120 $13,1371604697ft
feet 2.0-3.055.8 Cross Slope (PAR)SF1958.4to $120 $2,2621604707ft
feet 2.0-3.065.9 Cross Slope (PAR)SF6875.3to $120 $8,1781604717ft
feet 2.0-3.077.5 Cross Slope (PAR)SF8989.8to $120 $10,7011604727ft
feet 2.0-3.092.7 Cross Slope (PAR)SF140112.0to $120 $16,7911604737ft
feet 2.0-3.0115.7 Cross Slope (PAR)SF71125.5to $120 $8,5261604747ft
feet 4.0-5.0125.5 Cross Slope (PAR)SF71135.3to $120 $8,5261604757ft
feet 2.0-3.0137.4 Cross Slope (PAR)SF28141.3to $120 $3,3931604767ft
feet 2.0-3.0145.6 Cross Slope (PAR)SF107160.3to $120 $12,7891604777ft
feet161.3 Driveway210.7to166147
feet .32201.2 Vertical Change REF7202.2to138940 7 ft
feet 3.41210.2 Vertical Change REF7211.2to138941 7 ft
feet 3.0-4.0210.8 Cross Slope (Driveway)SF17213.1to $40 $6671604787ft
feet 2.0-3.0213.3 Cross Slope (PAR)SF14215.2to $120 $1,6531604797ft
feet 4.0-5.0215.5 Cross Slope (PAR)SF9216.8to $120 $1,1311604807ft
feet 3.0-4.0219.7 Cross Slope (PAR)SF15221.8to $120 $1,8271604817ft
feet 2.0-3.0221.8 Cross Slope (PAR)SF104236.1to $120 $12,4411604827ft
feet 4.0-5.0237.2 Cross Slope (PAR)SF25240.6to $120 $2,9581604837ft
feet 2.0-3.0241.4 Cross Slope (PAR)SF26245.0to $120 $3,1321604847ft
feet245.9 Continuous Width SF7246.9to $120 $8701670187ft
feet250.3 Cold Patch 186275.9to140228 7 ft
feet .44250.8 Vertical Change LF7251.8to $75 $5441389427ft
feet -.5261.1 Vertical Change SF7262.1to $75 $5441389437ft
feet276.0 Driveway302.9to166148
feet .3292.8 Vertical Change REF7293.8to138944 7 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
814
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912030948
Run ID
E 37Th St
96
ID Sidewalk Width
Priority
feet 5.0-6.0302.9 Cross Slope (Driveway)SF32307.3to $40 $1,2761604857ft
feet 3.18304.2 Vertical Change REF7305.2to138945 7 ft
feet 3.0-4.0307.7 Cross Slope (PAR)SF15309.8to $120 $1,8271604867ft
feet309.8 Driveway366.3to166149
feet .58325.0 Vertical Change REF7326.0to138946 7 ft
feet -.33360.6 Vertical Change REF7361.6to138947 7 ft
feet 2.0-3.0366.3 Cross Slope (Driveway)SF44372.3to $40 $1,7401604877ft
feet 2.0-3.0376.0 Cross Slope (PAR)SF19378.6to $120 $2,2621604887ft
feet 2.0-3.0381.5 Cross Slope (PAR)SF15383.6to $120 $1,8271604897ft
feet 2.0-3.0386.5 Cross Slope (PAR)SF78397.3to $120 $9,3961604907ft
feet 2.0-3.0409.0 Cross Slope (PAR)SF12410.7to $120 $1,4791604917ft
feet411.3 Driveway437.8to166150
feet 5.0-6.0438.7 Cross Slope (PAR)SF35443.5to $120 $4,1761604927ft
feet 3.0-4.0445.8 Cross Slope (PAR)SF57453.6to $120 $6,7861604937ft
feet 5.0-6.0453.6 Cross Slope (PAR)SF34458.3to $120 $4,0891604947ft
feet 3.0-4.0458.3 Cross Slope (PAR)SF8459.4to $120 $9571604957ft
feet 2.0-3.0461.9 Cross Slope (PAR)SF21464.8to $120 $2,5231604967ft
feet 3.0-4.0469.6 Cross Slope (PAR)SF9470.8to $120 $1,0441604977ft
feet 3.0-4.0475.4 Cross Slope (PAR)SF26479.0to $120 $3,1321604987ft
feet 3.0-4.0483.8 Cross Slope (PAR)SF9485.0to $120 $1,0441604997ft
feet 2.0-3.0485.0 Cross Slope (PAR)SF20487.8to $120 $2,4361605007ft
feet488.7 Driveway518.0to166151
feet -.28489.3 Vertical Change REF7490.3to138948 7 ft
feet 3.0-4.0519.9 Cross Slope (PAR)SF33524.5to $120 $4,0021605017ft
feet 5.0-6.0524.9 Cross Slope (PAR)SF28528.8to $120 $3,3931605027ft
feet 3.0-4.0529.8 Cross Slope (PAR)SF26533.4to $120 $3,1321605037ft
feet 5.0-6.0536.2 Cross Slope (PAR)SF12537.8to $120 $1,3921605047ft
feet 3.0-4.0538.9 Cross Slope (PAR)SF8540.0to $120 $9571605057ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
815
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912030948
Run ID
E 37Th St
96
ID Sidewalk Width
Priority
feet 4.0-5.0542.1 Cross Slope (PAR)SF28546.0to $120 $3,3931605067ft
feet 4.0-5.0548.5 Cross Slope (PAR)SF90560.9to $120 $10,7881605077ft
feet560.9 Driveway589.4to166152
feet .28581.5 Vertical Change REF7582.5to138950 7 ft
feet 3.0-4.0589.4 Cross Slope (Driveway)SF62597.9to $40 $2,4651605087ft
feet 2.0-3.0598.7 Cross Slope (PAR)SF9600.0to $120 $1,1311605097ft
feet 5.0-6.0608.8 Cross Slope (PAR)SF11610.3to $120 $1,3051605107ft
feet 2.0-3.0614.1 Cross Slope (PAR)SF42619.9to $120 $5,0461605117ft
feet .27614.6 Vertical Change REF7615.6to138951 7 ft
feet 2.0-3.0624.0 Cross Slope (PAR)SF117640.1to $120 $14,0071605127ft
feet 4.0-5.0641.7 Cross Slope (PAR)SF73651.8to $120 $8,7871605137ft
feet 2.0-3.0651.8 Cross Slope (PAR)SF30655.9to $120 $3,5671605147ft
feet 4.0-5.0656.3 Cross Slope (PAR)SF40661.8to $120 $4,7851605157ft
feet .29658.8 Vertical Change REF7659.8to138952 7 ft
feet .36665.4 Vertical Change REF7666.4to138953 7 ft
feet 4.0-5.0665.4 Cross Slope (PAR)SF299706.7to $120 $35,9311605167ft
feet -.31671.9 Vertical Change REF7672.9to138954 7 ft
feet .32693.4 Vertical Change REF7694.4to138955 7 ft
feet .27702.7 Vertical Change REF7703.7to138956 7 ft
feet -.3706.3 Vertical Change REF20709.1to138957 7 ft
feet708.4 Driveway730.8to166153
feet .26727.1 Vertical Change REF7728.1to138958 7 ft
feet 4.0-5.0731.8 Cross Slope (PAR)SF12733.5to $120 $1,4791605177ft
feet 2.0-3.0734.3 Cross Slope (PAR)SF22737.3to $120 $2,6101605187ft
feet 4.0-5.0738.2 Cross Slope (PAR)SF166761.1to $120 $19,9231605197ft
feet 2.0-3.0761.8 Cross Slope (PAR)SF18764.3to $120 $2,1751605207ft
feet 4.0-5.0765.3 Cross Slope (PAR)SF199792.8to $120 $23,9251605217ft
feet .38778.5 Vertical Change REF7779.5to138959 7 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
816
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
S SANTA FE AVE
End Street Name
1912030948
Run ID
E 37Th St
96
ID Sidewalk Width
Priority
feet 2.0-3.0793.5 Cross Slope (PAR)SF92806.2to $120 $11,0491605227ft
feet 5.0-6.0806.9 Cross Slope (PAR)SF10808.3to $120 $1,2181605237ft
feet 6.0-7.0808.3 Cross Slope (PAR)SF23811.5to $120 $2,7841605247ft
feet 5.0-6.0811.5 Cross Slope (PAR)SF34816.2to $120 $4,0891605257ft
feet 3.0-4.0816.8 Cross Slope (PAR)SF141836.2to $120 $16,8781605267ft
feet 5.0-6.0836.2 Cross Slope (PAR)SF41841.8to $120 $4,8721605277ft
feet 3.0-4.0841.8 Cross Slope (PAR)SF15843.8to $120 $1,7401605287ft
feet 2.0-3.0843.8 Cross Slope (PAR)SF15845.8to $120 $1,7401605297ft
$374,027.50TOTAL COST FOR:E 37TH STNside of Starting at:2522 E 37TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
817
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
JEWEL AVE
End Street Name
1912031056
Run ID
E 37Th St
88
ID Sidewalk Width
Priority
feet 2.0-3.00.3 Cross Slope (PAR)SF212.8to $120 $2,5501602749ft
feet 2.0-3.06.3 Cross Slope (PAR)SF9817.8to $120 $11,7301602759ft
feet 2.0-3.024.1 Cross Slope (PAR)SF5931.0to $120 $7,0381602769ft
feet 2.0-3.040.8 Cross Slope (PAR)SF6448.3to $120 $7,6501602779ft
feet 2.0-3.055.8 Cross Slope (PAR)SF10768.4to $120 $12,8521602789ft
feet 4.0-5.070.8 Cross Slope (PAR)SF4476.0to $120 $5,3041602799ft
feet 2.0-3.076.0 Cross Slope (PAR)SF977.0to $120 $1,0201602809ft
feet 3.0-4.096.0 Cross Slope (PAR)SF2999.4to $120 $3,4681602819ft
feet 2.0-3.099.8 Cross Slope (PAR)SF514160.3to $120 $61,7101602829ft
feet 2.0-3.0163.7 Cross Slope (PAR)SF38168.2to $120 $4,5901602839ft
feet 4.0-5.0168.7 Cross Slope (PAR)SF88179.0to $120 $10,5061602849ft
feet 5.0-6.0181.3 Cross Slope (PAR)SF40186.0to $120 $4,7941602859ft
feet 3.0-4.0186.3 Cross Slope (PAR)SF41191.1to $120 $4,8961602869ft
feet 4.0-5.0194.7 Cross Slope (PAR)SF35198.8to $120 $4,1821602879ft
feet 6.0-7.0199.8 Cross Slope (PAR)SF11201.1to $120 $1,3261602889ft
feet 6.0-7.0206.3 Cross Slope (PAR)SF62213.6to $120 $7,4461602899ft
feet 5.0-6.0213.6 Cross Slope (PAR)SF43218.6to $120 $5,1001602909ft
feet 3.0-4.0219.2 Cross Slope (PAR)SF28222.5to $120 $3,3661602919ft
feet 4.0-5.0225.4 Cross Slope (PAR)SF101237.3to $120 $12,1381602929ft
feet 2.0-3.0237.3 Cross Slope (PAR)SF76246.2to $120 $9,0781602939ft
feet 4.0-5.0246.2 Cross Slope (PAR)SF24249.0to $120 $2,8561602949ft
feet 6.0-7.0249.0 Cross Slope (PAR)SF23251.7to $120 $2,7541602959ft
feet 5.0-6.0251.7 Cross Slope (PAR)SF16253.6to $120 $1,9381602969ft
feet 3.0-4.0254.3 Cross Slope (PAR)SF41259.1to $120 $4,8961602979ft
feet 5.0-6.0259.4 Cross Slope (PAR)SF25262.3to $120 $2,9581602989ft
feet 3.0-4.0263.0 Cross Slope (PAR)SF153281.0to $120 $18,3601602999ft
feet -.26275.2 Vertical Change REF9276.2to138870 9 ft
feet 5.0-6.0281.7 Cross Slope (PAR)SF81291.2to $120 $9,6901603009ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
818
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
JEWEL AVE
End Street Name
1912031056
Run ID
E 37Th St
88
ID Sidewalk Width
Priority
feet 3.0-4.0293.6 Cross Slope (PAR)SF12295.0to $120 $1,4281603019ft
feet 2.0-3.0297.2 Cross Slope (PAR)SF208321.7to $120 $24,9901603029ft
feet .26314.9 Vertical Change REF9315.9to138871 9 ft
feet 4.0-5.0321.7 Cross Slope (PAR)SF277354.3to $120 $33,2521603039ft
feet 2.0-3.0355.2 Cross Slope (PAR)SF23357.9to $120 $2,7541603049ft
feet 4.0-5.0359.5 Cross Slope (PAR)SF116373.1to $120 $13,8721603059ft
feet 6.0-7.0374.0 Cross Slope (PAR)SF9375.0to $120 $1,0201603069ft
feet 5.0-6.0375.0 Cross Slope (PAR)SF28378.3to $120 $3,3661603079ft
feet 3.0-4.0379.0 Cross Slope (PAR)SF63386.4to $120 $7,5481603089ft
feet 4.0-5.0389.9 Cross Slope (PAR)SF164409.2to $120 $19,6861603099ft
feet .35400.3 Vertical Change REF9401.3to138872 9 ft
feet 4.0-5.0412.0 Cross Slope (PAR)SF151429.8to $120 $18,1561603109ft
feet430.0 Driveway466.3to166131
feet 5.0-6.0466.9 Cross Slope (PAR)SF50472.8to $120 $6,0181603119ft
feet 3.0-4.0475.0 Cross Slope (PAR)SF150492.6to $120 $17,9521603129ft
feet 1.44497.0 Vertical Change REF9498.0to138873 9 ft
feet 3.0-4.0497.0 Cross Slope (PAR)SF235524.7to $120 $28,2541603139ft
feet -.27505.3 Vertical Change REF9506.3to138874 9 ft
feet 5.0-6.0524.7 Cross Slope (PAR)SF22527.3to $120 $2,6521603149ft
feet 3.0-4.0527.3 Cross Slope (PAR)SF10528.5to $120 $1,2241603159ft
feet 2.0-3.0528.5 Cross Slope (PAR)SF45533.8to $120 $5,4061603169ft
feet 4.0-5.0533.8 Cross Slope (PAR)SF136549.8to $120 $16,3201603179ft
feet -.34541.1 Vertical Change REF9542.1to138875 9 ft
feet .35548.6 Vertical Change REF9549.6to138876 9 ft
feet 2.0-3.0549.8 Cross Slope (PAR)SF33553.7to $120 $3,9781603189ft
feet 4.0-5.0553.7 Cross Slope (PAR)SF145570.8to $120 $17,4421603199ft
feet .42568.6 Vertical Change REF9569.6to138877 9 ft
feet571.9 Driveway601.6to166132
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
819
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
JEWEL AVE
End Street Name
1912031056
Run ID
E 37Th St
88
ID Sidewalk Width
Priority
feet 4.0-5.0601.7 Cross Slope (Driveway)SF264632.8to $40 $10,5741603209ft
feet 4.0-5.0635.6 Cross Slope (PAR)SF125650.3to $120 $14,9941603219ft
feet 2.0-3.0650.5 Cross Slope (PAR)SF20652.8to $120 $2,3461603229ft
feet 2.0-3.0655.5 Cross Slope (PAR)SF93666.4to $120 $11,1181603239ft
feet 4.0-5.0666.4 Cross Slope (PAR)SF63673.8to $120 $7,5481603249ft
feet674.1 Driveway703.2to166133
feet -.36693.0 Vertical Change REF9694.0to138878 9 ft
feet 4.0-5.0703.3 Cross Slope (Driveway)SF111716.3to $40 $4,4201603259ft
feet 2.0-3.0716.3 Cross Slope (PAR)SF13717.8to $120 $1,5301603269ft
feet 3.0-4.0721.5 Cross Slope (PAR)SF69729.6to $120 $8,2621603279ft
feet .3729.3 Vertical Change REF9730.3to138879 9 ft
feet 2.0-3.0729.6 Cross Slope (PAR)SF12731.0to $120 $1,4281603289ft
feet 2.0-3.0733.3 Cross Slope (PAR)SF115746.8to $120 $13,7701603299ft
feet 4.0-5.0747.8 Cross Slope (PAR)SF114761.2to $120 $13,6681603309ft
feet762.0 Driveway798.5to166134
feet .26766.4 Vertical Change REF9767.4to138880 9 ft
feet 4.0-5.0798.6 Cross Slope (PAR)SF144815.5to $120 $17,2381603319ft
feet -.29812.5 Vertical Change LF9813.5to $75 $6381388819ft
feet .29817.4 Vertical Change REF9818.4to138882 9 ft
feet 3.0-4.0817.6 Cross Slope (PAR)SF24820.4to $120 $2,8561603329ft
feet 2.0-3.0820.4 Cross Slope (PAR)SF17822.4to $120 $2,0401603339ft
feet 4.0-5.0825.2 Cross Slope (PAR)SF86835.3to $120 $10,3021603349ft
feet .26825.8 Vertical Change REF9826.8to138883 9 ft
feet 2.0-3.0837.0 Cross Slope (PAR)SF70845.2to $120 $8,3641603359ft
feet 4.0-5.0845.9 Cross Slope (PAR)SF315882.9to $120 $37,7401603369ft
feet .31872.9 Vertical Change REF9873.9to138884 9 ft
feet883.9 Driveway913.2to166135
feet 4.0-5.0913.5 Cross Slope (PAR)SF82923.2to $120 $9,8941603379ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
820
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 37TH ST
Street Side
2522 E 37TH ST
Survey Street Name Starting Street Name
JEWEL AVE
End Street Name
1912031056
Run ID
E 37Th St
88
ID Sidewalk Width
Priority
feet 2.0-3.0923.2 Cross Slope (PAR)SF60930.3to $120 $7,2421603389ft
feet 4.0-5.0930.9 Cross Slope (PAR)SF85940.9to $120 $10,2001603399ft
feet 5.0-6.0944.2 Cross Slope (PAR)SF77953.3to $120 $9,2821603409ft
feet 3.0-4.0953.3 Cross Slope (PAR)SF43958.4to $120 $5,2021603419ft
feet 2.0-3.0965.7 Cross Slope (PAR)SF47971.2to $120 $5,6101603429ft
feet 2.0-3.0973.6 Cross Slope (PAR)SF30977.1to $120 $3,5701603439ft
feet .51979.4 Vertical Change REF9980.4to138885 9 ft
feet 4.0-5.0980.2 Cross Slope (PAR)SF59987.1to $120 $7,0381603449ft
feet 3.0-4.0990.1 Cross Slope (PAR)SF20992.4to $120 $2,3461603459ft
feet .43990.2 Vertical Change REF9991.2to138886 9 ft
$678,733.50TOTAL COST FOR:E 37TH STSside of Starting at:2522 E 37TH ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
821
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 37TH ST
Street Side
IRVING ST
Survey Street Name Starting Street Name
2350 E 37TH ST
End Street Name
1911211050
Run ID
E 37Th St
73
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF46647.8to $120 $55,92614227710ft
feet 2.0-3.047.8 Cross Slope (PAR)SF10458.5to $120 $12,51914227810ft
feet 4.0-5.058.5 Cross Slope (PAR)SF12271.0to $120 $14,62514227910ft
feet 2.0-3.071.0 Cross Slope (PAR)SF5376.4to $120 $6,31814228010ft
feet .777.8 Vertical Change SF1078.8to $75 $73113366010ft
feet 2.8990.3 Vertical Change SF1091.3to $75 $73113366110ft
feet 1.6395.7 Vertical Change SF1096.7to $75 $73113366210ft
feet 2.0-3.0101.0 Cross Slope (PAR)SF62107.4to $120 $7,48814228110ft
feet 4.0-5.0107.4 Cross Slope (PAR)SF99117.6to $120 $11,93414228210ft
feet119.1 Driveway140.8to164620
feet 3.38120.3 Vertical Change REF10121.3to133663 10 ft
feet 4.0-5.0140.9 Cross Slope (Driveway)SF232164.7to $40 $9,28214228310ft
feet 2.0-3.0164.7 Cross Slope (PAR)SF15166.2to $120 $1,75514228410ft
feet 2.0-3.0173.2 Cross Slope (PAR)SF74180.8to $120 $8,89214228510ft
feet 2.0-3.0184.8 Cross Slope (PAR)SF400225.8to $120 $47,97014228610ft
feet 2.0-3.0228.9 Cross Slope (PAR)SF74236.5to $120 $8,89214228710ft
feet236.5 Driveway293.3to164621
feet 2.0-3.0294.6 Cross Slope (PAR)SF200315.1to $120 $23,98514228810ft
feet315.5 Driveway364.6to164622
feet 2.0-3.0365.8 Cross Slope (PAR)SF31369.0to $120 $3,74414228910ft
feet369.0 Driveway395.9to164623
feet 4.0-5.0396.5 Cross Slope (Driveway)SF38400.4to $40 $1,52114229010ft
feet 2.0-3.0400.4 Cross Slope (PAR)SF216422.6to $120 $25,97414229110ft
feet 2.34412.1 Vertical Change REF10413.1to133664 10 ft
feet 2.0-3.0425.5 Cross Slope (PAR)SF96435.3to $120 $11,46614229210ft
feet 1.19428.4 Vertical Change REF10429.4to133665 10 ft
feet 2.0-3.0439.7 Cross Slope (PAR)SF98449.8to $120 $11,81714229310ft
feet 2.0-3.0455.0 Cross Slope (PAR)SF53460.4to $120 $6,31814229410ft
feet 2.0-3.0464.9 Cross Slope (PAR)SF28467.8to $120 $3,39314229510ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
822
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
S E 37TH ST
Street Side
IRVING ST
Survey Street Name Starting Street Name
2350 E 37TH ST
End Street Name
1911211050
Run ID
E 37Th St
73
ID Sidewalk Width
Priority
feet 4.0-5.0467.8 Cross Slope (PAR)SF78475.8to $120 $9,36014229610ft
feet 1.17474.1 Vertical Change REF10475.1to133666 10 ft
feet 2.0-3.0475.8 Cross Slope (PAR)SF42480.1to $120 $5,03114229710ft
$290,403.75TOTAL COST FOR:E 37TH STSside of Starting at:IRVING ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
823
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
JEWEL AVE
Survey Street Name Starting Street Name
2522 E 37TH ST
End Street Name
1912030935
Run ID
E 37Th St
80.5
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF202.7to $120 $2,3491605307ft
feet 2.0-3.03.3 Cross Slope (PAR)SF418.9to $120 $4,8721605317ft
feet 1.817.9 Vertical Change REF78.9to138961 7 ft
feet 4.0-5.08.9 Cross Slope (PAR)SF2512.4to $120 $3,0451605327ft
feet 2.0-3.012.8 Cross Slope (PAR)SF2516.3to $120 $3,0451605337ft
feet16.5 Driveway59.3to166154
feet 2.0-3.059.3 Cross Slope (Driveway)SF8370.8to $40 $3,3351605347ft
feet 4.0-5.070.8 Cross Slope (PAR)SF3575.6to $120 $4,1761605357ft
feet 2.0-3.077.1 Cross Slope (PAR)SF10892.0to $120 $12,9631605367ft
feet 4.0-5.092.7 Cross Slope (PAR)SF505162.4to $120 $60,6391605377ft
feet .6393.8 Vertical Change REF794.8to138962 7 ft
feet 2.0-3.0163.2 Cross Slope (PAR)SF75173.6to $120 $9,0481605387ft
feet 4.0-5.0175.3 Cross Slope (PAR)SF99189.0to $120 $11,9191605397ft
feet 2.0-3.0189.0 Cross Slope (PAR)SF20191.7to $120 $2,3491605407ft
feet 3.0-4.0194.4 Cross Slope (PAR)SF188220.3to $120 $22,5331605417ft
feet 2.0-3.0221.5 Cross Slope (PAR)SF65230.4to $120 $7,7431605427ft
feet 2.0-3.0236.1 Cross Slope (PAR)SF24239.4to $120 $2,8711605437ft
feet 4.0-5.0240.8 Cross Slope (PAR)SF114256.5to $120 $13,6591605447ft
feet 6.0-7.0256.5 Cross Slope (PAR)SF17258.9to $120 $2,0881605457ft
feet 4.0-5.0259.8 Cross Slope (PAR)SF12261.5to $120 $1,4791605467ft
feet 4.0-5.0263.8 Cross Slope (PAR)SF491331.5to $120 $58,8991605477ft
feet -.34283.4 Vertical Change REF7284.4to138963 7 ft
feet .27304.2 Vertical Change REF7305.2to138964 7 ft
feet 6.0-7.0334.4 Cross Slope (PAR)SF16336.6to $120 $1,9141605487ft
feet 2.0-3.0339.2 Cross Slope (PAR)SF22342.2to $120 $2,6101605497ft
feet 2.0-3.0347.0 Cross Slope (PAR)SF24350.3to $120 $2,8711605507ft
feet 2.0-3.0361.2 Cross Slope (PAR)SF26364.8to $120 $3,1321605517ft
feet 2.0-3.0368.5 Cross Slope (PAR)SF9369.7to $120 $1,0441605527ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
824
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
JEWEL AVE
Survey Street Name Starting Street Name
2522 E 37TH ST
End Street Name
1912030935
Run ID
E 37Th St
80.5
ID Sidewalk Width
Priority
feet 2.0-3.0377.1 Cross Slope (PAR)SF9378.3to $120 $1,0441605537ft
feet 2.0-3.0380.6 Cross Slope (PAR)SF189406.7to $120 $22,7071605547ft
feet -.28387.9 Vertical Change REF7388.9to138966 7 ft
feet -.26415.4 Vertical Change REF7416.4to138967 7 ft
feet 2.0-3.0416.2 Cross Slope (PAR)SF27419.9to $120 $3,2191605557ft
feet 2.0-3.0458.3 Cross Slope (PAR)SF32462.7to $120 $3,8281605567ft
feet 2.0-3.0467.6 Cross Slope (PAR)SF20470.3to $120 $2,3491605577ft
feet 2.0-3.0472.4 Cross Slope (PAR)SF10473.8to $120 $1,2181605587ft
feet 2.0-3.0478.0 Cross Slope (PAR)SF106492.6to $120 $12,7021605597ft
feet 3.0-4.0494.8 Cross Slope (PAR)SF21497.7to $120 $2,5231605607ft
feet 2.0-3.0497.7 Cross Slope (PAR)SF29501.7to $120 $3,4801605617ft
feet 4.0-5.0503.3 Cross Slope (PAR)SF117519.5to $120 $14,0941605627ft
feet 2.0-3.0520.8 Cross Slope (PAR)SF73530.9to $120 $8,7871605637ft
feet 3.0-4.0537.4 Cross Slope (PAR)SF16539.6to $120 $1,9141605647ft
feet 2.0-3.0539.6 Cross Slope (PAR)SF9540.8to $120 $1,0441605657ft
feet 2.0-3.0544.5 Cross Slope (PAR)SF120561.1to $120 $14,4421605667ft
feet -.28551.1 Vertical Change REF7552.1to138968 7 ft
feet 2.0-3.0563.3 Cross Slope (PAR)SF28567.1to $120 $3,3061605677ft
feet 2.0-3.0571.6 Cross Slope (PAR)SF19574.2to $120 $2,2621605687ft
feet 2.0-3.0576.3 Cross Slope (PAR)SF188602.2to $120 $22,5331605697ft
feet 4.0-5.0602.2 Cross Slope (PAR)SF30606.3to $120 $3,5671605707ft
feet .66604.2 Vertical Change REF7605.2to138969 7 ft
feet 2.0-3.0608.3 Cross Slope (PAR)SF11609.8to $120 $1,3051605717ft
feet 3.0-4.0619.3 Cross Slope (PAR)SF29623.3to $120 $3,4801605727ft
feet 2.0-3.0623.3 Cross Slope (PAR)SF40628.8to $120 $4,7851605737ft
feet -.33628.6 Vertical Change REF7629.6to138970 7 ft
feet 2.0-3.0630.9 Cross Slope (PAR)SF94643.9to $120 $11,3101605747ft
feet .26637.1 Vertical Change REF7638.1to138971 7 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
825
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
JEWEL AVE
Survey Street Name Starting Street Name
2522 E 37TH ST
End Street Name
1912030935
Run ID
E 37Th St
80.5
ID Sidewalk Width
Priority
feet 2.0-3.0646.4 Cross Slope (PAR)SF54653.8to $120 $6,4381605757ft
feet 2.0-3.0662.8 Cross Slope (PAR)SF117679.0to $120 $14,0941605767ft
feet 4.0-5.0679.0 Cross Slope (PAR)SF91691.6to $120 $10,9621605777ft
feet693.8 Driveway719.0to166155
feet 2.0-3.0720.3 Cross Slope (PAR)SF22723.4to $120 $2,6971605787ft
feet 2.0-3.0727.9 Cross Slope (PAR)SF50734.8to $120 $6,0031605797ft
feet 4.0-5.0735.4 Cross Slope (PAR)SF50742.3to $120 $6,0031605807ft
feet 2.0-3.0746.2 Cross Slope (PAR)SF109761.3to $120 $13,1371605817ft
feet 4.0-5.0761.3 Cross Slope (PAR)SF108776.2to $120 $12,9631605827ft
feet 2.0-3.0776.6 Cross Slope (PAR)SF102790.7to $120 $12,2671605837ft
feet 4.0-5.0790.7 Cross Slope (PAR)SF26794.3to $120 $3,1321605847ft
feet 2.0-3.0794.3 Cross Slope (PAR)SF159816.2to $120 $19,0531605857ft
feet 3.0-4.0818.3 Cross Slope (PAR)SF27822.0to $120 $3,2191605867ft
feet 2.0-3.0824.1 Cross Slope (PAR)SF87836.1to $120 $10,4401605877ft
feet 4.0-5.0836.1 Cross Slope (PAR)SF118852.4to $120 $14,1811605887ft
feet 2.0-3.0853.5 Cross Slope (PAR)SF68862.9to $120 $8,1781605897ft
feet 2.0-3.0868.0 Cross Slope (PAR)SF84879.6to $120 $10,0921605907ft
feet 2.0-3.0887.8 Cross Slope (PAR)SF91900.3to $120 $10,8751605917ft
feet 2.0-3.0904.2 Cross Slope (PAR)SF9905.5to $120 $1,1311605927ft
feet907.3 Driveway948.5to166156
feet 2.0-3.0948.5 Cross Slope (Driveway)SF122965.3to $40 $4,8721605937ft
feet .27966.9 Vertical Change REF7967.9to138972 7 ft
feet 2.0-3.0967.7 Cross Slope (PAR)SF12969.4to $120 $1,4791605947ft
feet 4.0-5.0970.3 Cross Slope (PAR)SF87982.3to $120 $10,4401605957ft
feet 2.0-3.0984.1 Cross Slope (PAR)SF79995.0to $120 $9,4831605967ft
feet 2.0-3.0997.3 Cross Slope (PAR)SF351002.1to $120 $4,1761605977ft
$579,797.00TOTAL COST FOR:E 37TH STNside of Starting at:JEWEL AVE
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
826
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
ROSS ST
Survey Street Name Starting Street Name
IRVING ST
End Street Name
1911211029
Run ID
E 37Th St
69.5
ID Sidewalk Width
Priority
feet 3.0-4.00.0 Cross Slope (PAR)SF464.8to $120 $5,47214230910ft
feet 2.0-3.04.8 Cross Slope (PAR)SF8714.0to $120 $10,48814231010ft
feet 2.0-3.016.1 Cross Slope (PAR)SF11528.2to $120 $13,79414231110ft
feet .3527.6 Vertical Change REF1028.6to133673 10 ft
feet 3.0-4.030.8 Cross Slope (PAR)SF10541.8to $120 $12,54014231210ft
feet 3.0-4.044.8 Cross Slope (PAR)SF12457.8to $120 $14,82014231310ft
feet58.8 Driveway72.3to164625
feet 3.0-4.072.3 Cross Slope (Driveway)SF2975.3to $40 $1,14014231410ft
feet 3.4475.2 Vertical Change REF1076.2to133674 10 ft
feet 2.0-3.075.3 Cross Slope (PAR)SF8083.7to $120 $9,57614231510ft
feet 3.0-4.087.5 Cross Slope (PAR)SF2189.7to $120 $2,50814231610ft
feet 2.0-3.091.3 Cross Slope (PAR)SF202112.6to $120 $24,28214231710ft
feet 3.0-4.0115.5 Cross Slope (PAR)SF49120.7to $120 $5,92814231810ft
feet 3.0-4.0124.1 Cross Slope (PAR)SF16125.8to $120 $1,93814231910ft
feet 2.0-3.0126.6 Cross Slope (PAR)SF92136.3to $120 $11,05814232010ft
feet137.7 Driveway169.8to164626
feet 2.0-3.0171.4 Cross Slope (PAR)SF89180.8to $120 $10,71614232110ft
feet 3.0-4.0184.7 Cross Slope (PAR)SF19186.7to $120 $2,28014232210ft
feet .28186.6 Vertical Change REF10187.6to133675 10 ft
feet186.7 Driveway210.2to164627
feet 4.0-5.0210.8 Cross Slope (PAR)SF62217.3to $120 $7,41014232310ft
feet 2.0-3.0219.8 Cross Slope (PAR)SF352256.9to $120 $42,29414232410ft
feet .4252.7 Vertical Change REF10253.7to133676 10 ft
feet 2.0-3.0259.0 Cross Slope (PAR)SF293289.8to $120 $35,11214232510ft
feet 3.0-4.0292.5 Cross Slope (PAR)SF101303.1to $120 $12,08414232610ft
feet 2.0-3.0304.1 Cross Slope (PAR)SF12305.4to $120 $1,48214232710ft
feet306.4 Driveway373.8to164628
feet -.37327.3 Vertical Change REF35331.0to133677 10 ft
feet 4.0-5.0375.4 Cross Slope (PAR)SF85384.3to $120 $10,14614232810ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
827
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
ROSS ST
Survey Street Name Starting Street Name
IRVING ST
End Street Name
1911211029
Run ID
E 37Th St
69.5
ID Sidewalk Width
Priority
feet 2.0-3.0385.8 Cross Slope (PAR)SF22388.1to $120 $2,62214232910ft
feet 2.0-3.0392.8 Cross Slope (PAR)SF201414.0to $120 $24,16814233010ft
feet 2.0-3.0417.8 Cross Slope (PAR)SF333452.9to $120 $40,01414233110ft
feet .39423.8 Vertical Change REF10424.8to133678 10 ft
feet .35452.6 Vertical Change REF10453.6to133679 10 ft
feet 2.0-3.0455.7 Cross Slope (PAR)SF91465.3to $120 $10,94414233210ft
feet465.3 Cold Patch 19467.3to140218 10 ft
feet 2.0-3.0469.4 Cross Slope (PAR)SF66476.3to $120 $7,86614233310ft
feet .26477.8 Vertical Change REF10478.8to133680 10 ft
feet 2.0-3.0478.8 Cross Slope (PAR)SF12480.1to $120 $1,48214233410ft
feet 4.0-5.0480.9 Cross Slope (PAR)SF61487.3to $120 $7,29614233510ft
feet 3.0-4.0489.5 Cross Slope (PAR)SF65496.3to $120 $7,75214233610ft
feet497.1 Driveway524.8to164629
feet 2.0-3.0525.3 Cross Slope (Driveway)SF29528.4to $40 $1,17814233710ft
feet528.4 Cold Patch 22530.7to140219 10 ft
feet -.29529.8 Vertical Change LF10530.8to $75 $71313368110ft
feet 2.0-3.0531.7 Cross Slope (PAR)SF100542.2to $120 $11,97014233810ft
feet .36532.9 Vertical Change REF10533.9to133682 10 ft
feet 2.0-3.0546.4 Cross Slope (PAR)SF57552.4to $120 $6,84014233910ft
feet 2.0-3.0556.1 Cross Slope (PAR)SF145571.4to $120 $17,44214234010ft
feet571.7 Driveway602.9to164630
feet 2.0-3.0609.6 Cross Slope (PAR)SF83618.3to $120 $9,91814234110ft
feet618.3 Cold Patch 22620.6to140220 10 ft
feet 2.0-3.0621.3 Cross Slope (PAR)SF12622.6to $120 $1,48214234210ft
feet 2.0-3.0625.8 Cross Slope (PAR)SF238650.8to $120 $28,50014234310ft
feet 2.0-3.0657.7 Cross Slope (PAR)SF46662.5to $120 $5,47214234410ft
feet662.5 Driveway694.5to164631
feet695.0 Cold Patch 15696.6to140221 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
828
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
ROSS ST
Survey Street Name Starting Street Name
IRVING ST
End Street Name
1911211029
Run ID
E 37Th St
69.5
ID Sidewalk Width
Priority
feet 3.0-4.0696.6 Cross Slope (PAR)SF17698.4to $120 $2,05214234510ft
feet 2.0-3.0698.4 Cross Slope (PAR)SF23700.8to $120 $2,73614234610ft
feet710.1 Driveway774.1to164632
feet .32714.7 Vertical Change REF10715.7to133683 10 ft
feet .34754.2 Vertical Change REF10755.2to133684 10 ft
feet .5775.9 Vertical Change REF10776.9to133685 10 ft
feet 7.0-8.0776.8 Cross Slope (PAR)SF10777.8to $120 $1,14014234710ft
feet778.3 Driveway794.8to164633
feet .26795.7 Vertical Change LF10796.7to $75 $71313368610ft
feet 2.0-3.0797.3 Cross Slope (PAR)SF24799.8to $120 $2,85014234810ft
feet 4.0-5.0799.8 Cross Slope (PAR)SF125813.0to $120 $15,04814234910ft
feet 2.0-3.0816.9 Cross Slope (PAR)SF13818.3to $120 $1,59614235010ft
feet 3.0-4.0821.5 Cross Slope (PAR)SF60827.8to $120 $7,18214235110ft
feet828.3 Driveway841.5to164634
feet 4.0-5.0841.5 Cross Slope (Driveway)SF86850.6to $40 $3,45814235210ft
feet 3.38842.1 Vertical Change REF10843.1to133687 10 ft
feet .68844.7 Vertical Change REF10845.7to133688 10 ft
feet 3.37850.3 Vertical Change REF10851.3to133689 10 ft
feet 2.0-3.0854.3 Cross Slope (PAR)SF364892.6to $120 $43,66214235310ft
feet .27867.6 Vertical Change REF10868.6to133690 10 ft
feet 3.06878.5 Vertical Change REF10879.5to133691 10 ft
feet .67891.5 Vertical Change REF10892.5to133692 10 ft
feet893.5 Driveway910.7to164635
feet 3.48897.9 Vertical Change REF10898.9to133693 10 ft
feet 1.35905.3 Vertical Change REF10906.3to133694 10 ft
feet 3.0-4.0911.4 Cross Slope (Driveway)SF70918.8to $40 $2,81214235410ft
feet 2.0-3.0918.8 Cross Slope (PAR)SF57924.8to $120 $6,84014235510ft
feet 4.0-5.0925.3 Cross Slope (PAR)SF58931.4to $120 $6,95414235610ft
feet 2.0-3.0931.4 Cross Slope (PAR)SF112943.2to $120 $13,45214235710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
829
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
ROSS ST
Survey Street Name Starting Street Name
IRVING ST
End Street Name
1911211029
Run ID
E 37Th St
69.5
ID Sidewalk Width
Priority
feet .3932.3 Vertical Change REF10933.3to133695 10 ft
feet943.2 Driveway1007.1to164636
feet .41951.4 Vertical Change REF10952.4to133696 10 ft
feet .28994.3 Vertical Change REF10995.3to133697 10 ft
feet .321007.1 Vertical Change REF101008.1to133698 10 ft
$531,221.00TOTAL COST FOR:E 37TH STNside of Starting at:ROSS ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
830
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
ROSS ST
Survey Street Name Starting Street Name
S ALAMEDA ST
End Street Name
1911211240
Run ID
E 37Th St
55.5
ID Sidewalk Width
Priority
feet 2.0-3.00.3 Cross Slope (PAR)SF162.0to $120 $1,93814194710ft
feet 2.0-3.04.8 Cross Slope (PAR)SF9514.8to $120 $11,40014194810ft
feet 4.0-5.015.1 Cross Slope (PAR)SF4519.8to $120 $5,35814194910ft
feet 4.0-5.022.4 Cross Slope (PAR)SF13736.8to $120 $16,41614195010ft
feet -.2728.1 Vertical Change REF1029.1to133524 10 ft
feet 2.0-3.036.8 Cross Slope (PAR)SF2539.4to $120 $2,96414195110ft
feet 1.5837.5 Vertical Change REF1038.5to133525 10 ft
feet39.4 Driveway55.3to164581
feet .7146.1 Vertical Change REF1047.1to133526 10 ft
feet 2.0-3.055.3 Cross Slope (Driveway)SF1957.3to $40 $76014195210ft
feet 2.0-3.060.5 Cross Slope (PAR)SF8969.9to $120 $10,71614195310ft
feet 2.0-3.073.2 Cross Slope (PAR)SF9583.2to $120 $11,40014195410ft
feet83.2 Driveway101.3to164582
feet115.9 Driveway155.9to164583
feet -.38156.4 Vertical Change REF10157.4to133527 10 ft
feet 3.0-4.0157.3 Cross Slope (PAR)SF125170.5to $120 $15,04814195510ft
feet 4.0-5.0174.3 Cross Slope (PAR)SF152190.3to $120 $18,24014195610ft
feet 2.0-3.0192.4 Cross Slope (PAR)SF124205.5to $120 $14,93414195710ft
feet .87200.0 Vertical Change SF10201.0to $75 $71313352810ft
feet205.8 Driveway232.6to164584
feet 2.0-3.0234.2 Cross Slope (PAR)SF10235.3to $120 $1,25414195810ft
feet 4.0-5.0236.8 Cross Slope (PAR)SF86245.9to $120 $10,37414195910ft
feet 2.9241.5 Vertical Change REF10242.5to133529 10 ft
feet 2.0-3.0245.9 Cross Slope (PAR)SF53251.5to $120 $6,38414196010ft
feet 4.0-5.0252.2 Cross Slope (PAR)SF82260.8to $120 $9,80414196110ft
feet -.33254.2 Vertical Change REF10255.2to133530 10 ft
feet 2.0-3.0264.3 Cross Slope (PAR)SF10265.4to $120 $1,25414196210ft
feet266.5 Driveway280.6to164585
feet .33268.3 Vertical Change REF10269.3to133531 10 ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
831
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
ROSS ST
Survey Street Name Starting Street Name
S ALAMEDA ST
End Street Name
1911211240
Run ID
E 37Th St
55.5
ID Sidewalk Width
Priority
feet 4.0-5.0281.5 Cross Slope (PAR)SF319315.1to $120 $38,30414196310ft
feet -.3300.2 Vertical Change REF10301.2to133532 10 ft
feet -.32312.6 Vertical Change REF10313.6to133533 10 ft
feet 3.0-4.0317.6 Cross Slope (PAR)SF83326.3to $120 $9,91814196410ft
feet -.55318.5 Vertical Change REF10319.5to133534 10 ft
feet326.3 Driveway349.4to164586
feet 5.0-6.0349.5 Cross Slope (PAR)SF29352.6to $120 $3,53414196510ft
feet 3.0-4.0352.6 Cross Slope (PAR)SF17354.4to $120 $2,05214196610ft
feet 2.0-3.0354.4 Cross Slope (PAR)SF19356.4to $120 $2,28014196710ft
feet 2.0-3.0361.3 Cross Slope (PAR)SF102372.0to $120 $12,19814196810ft
feet372.8 Driveway404.8to164587
feet .33394.5 Vertical Change REF10395.5to133535 10 ft
feet .36406.9 Vertical Change REF10407.9to133536 10 ft
feet 4.0-5.0407.0 Cross Slope (PAR)SF43411.5to $120 $5,13014196910ft
feet 2.0-3.0412.8 Cross Slope (PAR)SF59419.0to $120 $7,06814197010ft
feet 2.1416.5 Vertical Change REF10417.5to133537 10 ft
feet 4.0-5.0419.0 Cross Slope (PAR)SF216441.7to $120 $25,87814197110ft
feet 1.07428.4 Vertical Change REF10429.4to133538 10 ft
feet 2.0-3.0441.7 Cross Slope (PAR)SF257468.8to $120 $30,89414197210ft
feet .3458.4 Vertical Change REF10459.4to133539 10 ft
feet 4.0-5.0468.8 Cross Slope (PAR)SF42473.2to $120 $5,01614197310ft
feet 3.0-4.0475.3 Cross Slope (PAR)SF48480.4to $120 $5,81414197410ft
feet480.8 Driveway522.3to164588
feet -.26503.1 Vertical Change REF10504.1to133540 10 ft
feet 3.0-4.0522.3 Cross Slope (Driveway)SF66529.2to $40 $2,62214197510ft
feet .34530.2 Vertical Change LF10531.2to $75 $71313354110ft
feet 3.0-4.0531.8 Cross Slope (PAR)SF13533.2to $120 $1,59614197610ft
feet 2.0-3.0534.2 Cross Slope (PAR)SF95544.2to $120 $11,40014197710ft
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
832
Access Compliance Survey Report - SidewalksCity of Vernon
Year to be Completed TBDFunding Source:TBD
Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes
N E 37TH ST
Street Side
ROSS ST
Survey Street Name Starting Street Name
S ALAMEDA ST
End Street Name
1911211240
Run ID
E 37Th St
55.5
ID Sidewalk Width
Priority
feet 2.03548.4 Vertical Change REF10549.4to133542 10 ft
feet 2.0-3.0548.8 Cross Slope (PAR)SF81557.3to $120 $9,69014197810ft
feet 4.0-5.0557.3 Cross Slope (PAR)SF67564.3to $120 $7,98014197910ft
$321,043.00TOTAL COST FOR:E 37TH STNside of Starting at:ROSS ST
October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00
833