Loading...
20201215 City Council Agenda Packet Agenda City of Vernon Regular City Council Meeting Tuesday, December 15, 2020, 09:00 AM City Hall, Council Chamber 4305 Santa Fe Avenue Vernon, California Leticia Lopez, Mayor Melissa Ybarra, Mayor Pro Tem William Davis, Council Member Carol Menke, Council Member Diana Gonzales, Council Member SPECIAL REMOTE PROTOCOLS In accordance with Governor Newsom's Executive Order N -29-20, this will be a teleconference meeting without a physical location to help stop the spread of COVID -19. This meeting will be conducted entirely by remote participation via Zoom Webinar. The public is encouraged to view the meeting at http://www.cityofvernon.org/webinar-cc or by calling (408) 638-0968, Meeting ID 967-0858-6946#. You may submit comments to PublicComment@ci.vernon.ca.us with the subject line “December 15, 2020 City Council Meeting Public Comment Item #__.” Comments received prior to 8 a.m., Tuesday, December 15, 2020, will be read into the record. CALL TO ORDER FLAG SALUTE ROLL CALL APPROVAL OF THE AGENDA PUBLIC COMMENT At this time the public is encouraged to address the City Council on any matter that is within the subject matter jurisdiction of the City Council. The public will also be given a chance to comment on matters which are on the posted agenda during City Coun cil deliberation on those specific matters. Regular City Council Meeting Agenda December 15, 2020 Page 2 of 5 CONSENT CALENDAR All matters listed on the Consent Calendar are to be approved with one motion. Items may be removed from the Consent Calendar by any member of the Council. Those items removed will be considered immediately after the Consent Calendar. 1. City Clerk Approval of Minutes Recommendation: Approve the December 1, 2020 Regular City Council meeting minutes. 1. 20201201 City Council Minutes 2. City Clerk Claims Against the City Recommendation: Receive and file the claim submitted by Christina Cicione on behalf of State Farm Mutual Insurance a/s/o Leydi Y. Sanchez in the amount of $3,617.68. 1. 20201203 Cicione, C. - State Farm 3. Finance/Treasury City Payroll Warrant Register Recommendation: Approve City Payroll Warrant Register No. 774, for the period of November 1 through November 30, 2020, which totals $4,014,048.08 and consists of ratification of direct deposits, checks and taxes totaling $3,061,210.91 and ratification of checks and electronic fund transfers (EFT) for payroll related disbursements totaling $952,837.17 paid through operating bank account. 1. City Payroll Account Warrant Register No. 774 4. Finance/Treasury Operating Account Warrant Register Recommendation: Approve Operating Account Warrant Register No. 58, for the period of November 15 through November 28, 2020, which totals $9,099,407.66 and consists of ratification of electronic payments totaling $8,952,303.19 and ratification of the issuan ce of early checks totaling $147,104.47. 1. Operating Account Warrant Register No. 58 5. Fire Department Fire Department Activity Report Recommendation: Receive and file the September 2020 Report. 1. Fire Department Activity Report - 09/01/20 to 09/30/20 Regular City Council Meeting Agenda December 15, 2020 Page 3 of 5 6. Police Department Police Department Activity Report Recommendation: Receive and file the October 2020 Report. 1. Police Department Activity Report – October 2020 7. Public Works Arbor Day Foundation Application for Tree City USA Recommendation: A. Find that the proposed action is not subject to the California Environmental Quality Act (CEQA) as this application is not considered a “project” under CEQA which i s defined as an action directly undertaken by a public agency which has the potential for resulting in either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment, Cal. Pub. Res. Code Section 21065. Under the proposed application, no such activity is being undertaken. Even if the application were to be considered a “project” under CEQA, which is not the case, CEQA Guidelines Section 15308 categorically exempts actions taken by regulatory agencies that assure the maintenance, restoration, enhancement, or protection of the environment. Here, the request for authorization to submit an application to the Arbor Day Foundation will have no impact on the environment whatsoever; and B. Approve and authorize the Public Works Department to submit an application to the Arbor Day Foundation for Vernon to be Certified a Tree City USA for 2020. 1. Arbor Day Foundation Tree City 2020 Application 8. City Administration Fiscal Year (FY) 2020/2021 Docket I Grants Awarded by Vernon CommUNITY Fund Grant Committee Recommendation: Receive and file the report, as it is being provided for informational purposes only, pursuant to Section 2.167(e) of the Vernon Municipal Code. 9. City Administration Report on Services Agreement with Engineering Partners, Inc. Consultant Engineers for the Re-Design and Preparation of Plans for the Atlantic Bridge Widening Project Recommendation: Receive and file the report, as it is being provided for informational purposes only pursuant to Section 2.17.12(B)(3) of the Vernon Municipal Code. Regular City Council Meeting Agenda December 15, 2020 Page 4 of 5 NEW BUSINESS 10. Public Works Americans with Disabilities (ADA), Title II, Self -Evaluation and Transition Plan Recommendation: Adopt Resolution No. 2020-43 adopting the 2020 City of Vernon Americans with Disabilities (ADA) Act, Title II, Self-Evaluation and Transition Plan. 1. Resolution 2020-43 2. City of Vernon ADA Self -Evaluation Report 3. City of Vernon ADA Transition Plan 4. ADA Presentation to City Council ORAL REPORTS City Administrator Reports on Activities and other Announcements. City Council Reports on Activities (including AB1234), Announcements, or Directives to Staff. CLOSED SESSION 11. PUBLIC EMPLOYEE EVALUATION Government Code Section 54957(b)(1) Position: City Administrator CLOSED SESSION REPORT ADJOURNMENT I hereby certify under penalty of perjury under the laws of the State of California, that the foregoing agenda was posted on the bulletin board at the main entrance of the City of Vernon City Hall, located at 4305 Santa Fe Avenue, Vernon, California, and on the City’s website, not less than 72 hours prior to the meeting set forth on this agenda. Dated this 10th day of December, 2020. By: __________________________________ Sandra Dolson, Administrative Secretary Regular City Council Meeting Agenda December 15, 2020 Page 5 of 5 Guide to City Council Proceedings Meetings of the City Council are held the first and third Tuesday of each month at 9:00 a.m. and are conducted in accordance with Rosenberg's Rules of Order (Vernon Municipal Code Section 2.1-1). Copies of all agenda items and back-up materials are available for review in the City Clerk Department, Vernon City Hall, 4305 Santa Fe Avenue, Vernon, California, and are available for public inspection during regular business hours, Monday through Thursday, 7:00 a.m. to 5:30 p.m. Agenda reports may be reviewed on the City's website at www.cityofvernon.org or copies may be purchased for $0.10 per page. Disability-related services are available to enable persons with a disability to participate in this meeting, consistent with the Americans with Disabilities Act (ADA). In compliance with ADA, if you need special assistance, please contact the City Clerk department at CityClerk@ci.vernon.ca.us or (323) 583-8811 at least 48 hours prior to the meeting to assure arrangements can be made. The Public Comment portion of the agenda is for members of the public to present items, which are not listed on the agenda but are within the subject matter jurisdiction of the City Council. The City Council cannot take action on any item that is not on the agenda but matters raised under Public Comment may be referred to staff or scheduled on a future agenda. Comments are limited to three minutes per speaker unless a different time limit is announced. Speaker slips are available at the entrance to the Council Chamber. Public Hearings are legally noticed hearings. For hearings involving zoning matters, the applicant and appellant will be given 15 minutes to present their position to the City Council. Time may be set aside for rebuttal. All other testimony shall follow the rules as set for under Public Comment. If you challenge any City action in court, you may be limited to raising only those issues you or someone else raised during the public hearing, or in written correspondence delivered to the City Clerk at or prior to the public hearing. Consent Calendar items may be approved by a single motion. If a Council Member or the public wishes to discuss an item, it may be removed from the calendar for individual consideration. Council Members may indicate a negative or abstaining vote on any individual item by so declaring prior to the vote on the motion to adopt the Consent Calendar. Items excluded from the Consent Calendar will be taken up following action on the Consent Calendar. P ublic speakers shall follow the guidelines as set forth under Public Comment. New Business items are matters appearing before the Council for the first time for formal action. Those wishing to address the Council on New Business items shall follow the guidelines for Public Comment. Closed Session allows the Council to discuss specific matters pursuant to the Brown Act, Government Code Section 54956.9. Based on the advice of the City Attorney, discussion of these matters in open session would prejudice the position of the City. Following Closed Session, the City Attorney will provide an oral report on any reportable matters discussed and actions taken. At the conclusion of Closed Session, the Council may continue any item listed on the Closed Session agenda to the Open Session agenda for discussion or to take formal action as it deems appropriate. City Council Agenda Item Report Agenda Item No. COV-397-2020 Submitted by: Sandra Dolson Submitting Department: City Clerk Meeting Date: December 15, 2020 SUBJECT Approval of Minutes Recommendation: Approve the December 1, 2020 Regular City Council meeting minutes. Background: Staff has prepared and hereby submits the minutes for approval. Fiscal Impact: There is no fiscal impact associated with this report. Attachments: 1. 20201201 City Council Minutes MINUTES VERNON CITY COUNCIL REGULAR MEETING TUESDAY, DECEMBER 1, 2020 COUNCIL CHAMBER, 4305 SANTA FE AVENUE CALL TO ORDER Mayor Lopez called the meeting to order at 9:01 a.m. FLAG SALUTE Mayor Lopez led the Flag Salute. ROLL CALL PRESENT:Leticia Lopez, Mayor (via remote access) Melissa Ybarra, Mayor Pro Tem (via remote access) William Davis, Council Member (via remote access) Carol Menke, Council Member (via remote access) Diana Gonzales, Council Member (via remote access) STAFF PRESENT: Carlos Fandino, City Administrator (via remote access) Arnold Alvarez-Glasman, Interim City Attorney (via remote access) Lisa Pope, City Clerk Scott Williams, Finance Director (via remote access) Abraham Alemu, Public Utilities General Manager (via remote access) Fredrick Agyin, Health and Environmental Control Director (via remote access) Michael Earl, Human Resources Director (via remote access) Anthony Miranda, Police Chief (via remote access) Dan Wall, Public Works Director (via remote access) Mike Shehata, Senior Information Technology Analyst APPROVAL OF THE AGENDA MOTION Mayor Pro Tem Ybarra moved and Mayor Lopezseconded a motion to approve the agenda. The question was called and the motion carried unanimously. PUBLIC COMMENT None. Regular City Council Meeting Minutes Page 2 of 5 December 1, 2020 PRESENTATIONS 1.California Highway Patrol (CHP) “10851” Grand Theft Auto Recovery Award Recommendation: This is a presentation only. No action required by City Council. Police Chief Miranda and Lt. March Santiago acknowledged Officer Patrick Cam for receiving the California Highway Patrol (CHP) “10851” Grand Theft Auto Recovery Award. 2.Increased Use of Ground Water Recommendation: This is a presentation only. No action is required by City Council. Assistant General Manager Todd Dusenberry provided an update on the City’s use of imported water. In response to Council questions, Assistant General Manager Dusenberry explained the various funding sources; water storage capacity; and use of the tank. 3.Coronavirus (COVID-19) Vaccine Clinical Trial Update from University of Southern California (USC) Keck School of Medicine Recommendation: This is a presentation only. No action required by City Council. Health and Environmental Control Director Agyin and Mary Dacuma, Keck Medicine of USC, presented an update on the clinical trial, Operation Warp Speed. In response to Council questions, Ms. Dacuma and Health and Environmental Control Director Agyin discussed the intent for 350 participants; media relations; and different methods of vaccines. CONSENT CALENDAR MOTION Mayor Pro Tem Ybarra moved and Council Member Gonzales seconded a motion to approve the Consent Calendar. The question was called and the motion carried unanimously. The Consent Calendar consisted of the following items: 4.Approval of the Minutes Recommendation: Approve the November 17, 2020 Regular City Council meeting minutes. 5.Claims Against the City Recommendation: Receive and file the claims submitted by Vernon Tire Inc., dba Commercial Tire Company, in the amount of $18,000; and Jason Felix, in the amount of $900. Regular City Council Meeting Minutes Page 3 of 5 December 1, 2020 6.Operating Account Warrant Register Recommendation: Approve Operating Account Warrant Register No. 57, for the period of November 1 through November 14, 2020, which totals $4,931,288.20 and consists of ratification of electronic payments totaling $4,714,541.49 and ratification of the issuance of early checks totaling $216,746.71. 7.Public Works Department Monthly Report Recommendation: Receive and file the October 2020 Building Report. 8.Sale of Surplus Vernon Fire Apparatus and Equipment to Local Municipalities Recommendation: A. Approve and authorize the City Administrator to execute the Purchase and Sale Agreement with the City of Compton, in substantially the same form as submitted, for the sale of: 1. One (1) 2002 Seagrave Engine with assigned hose complement and equipment; 2. One (1) 1998 Spartan/LTI Truck 7576; and B. Approve and authorize the City Administrator to execute the Purchase and Sale Agreement with the City of Montebello, in substantially the same form as submitted, for the sale of: 1. One (1) 2009 Seagrave Engine 7576; 2. One (1) 2009 Seagrave Engine 779; 3. One (1) 2017 Hurst E- Draulic Cutter, spreader, ram, batteries, battery charger, chains, tips, and accessories; and 4. One (1) 2014 Hurst Quad Power Unit, cutter, spreader, ram, hoses w/quick couplers, chains, tips and accessories. 9.Donation of Surplus Vernon Fire Apparatus to Local Fire Academies Recommendation: A. Approve and authorize the City Administrator to execute the Deed of Gift and Donation Agreement and Release with Rio Hondo Fire Academy, in substantially the same form as submitted, for the donation of one (1) 2002 Seagrave Engine with assigned hose complement and equipment; and B. Approve and authorize the City Administrator to execute the Deed of Gift and Donation Agreement and Release with Verdugo Fire Academy/Glendale Community College, in substantially the same form as submitted, for the donation of one (1) 1998 Seagrave Engine with assigned hose complement and equipment. NEW BUSINESS 10.Amendments to the Classification and Compensation Plan Recommendation: A. Approve new job descriptions for the positions of Code Enforcement Officer and Utilities Program Analyst; and B. Adopt Resolution No. 2020-42 amending Exhibit C of the Classification and Compensation Plan, adopted by Resolution No. 2020- 19 and as amended by Resolution Nos. 2020-28, 2020-29, and 2020-32 to add new classifications and associated salary ranges. Human Resources Director Earl presented the staff report. MOTION Council Member Menke moved and Mayor Pro Tem Ybarra seconded a motion to: A. Approve new job descriptions for the positions of Code Enforcement Officer and Utilities Program Analyst; and B. Adopt Resolution No. 2020-42 amending Exhibit C of the Classification and Compensation Plan, adopted by Resolution No. 2020-19 and as amended by Resolution Nos. 2020-28, 2020-29, and 2020-32 to add new classifications and associated salary ranges. The question was called and the motion carried unanimously. Regular City Council Meeting Minutes Page 4 of 5 December 1, 2020 11.Software as a Service Agreement with Tyler Technologies for a Citywide Enterprise Resource Planning (ERP) Software System, Hosting, Implementation, and Support (Continued from November 17, 2020) Recommendation: Approve the Software as a Service Agreement with Tyler Technologies, Inc., in substantially the same form as submitted, for the purpose of an upgrade from the current Tyler ERP system (Eden) to a comprehensive ERP software system, which would include modules for Munis, EnerGov, Digital Health Department (DHD), and the Munis Utility Billing Customer Information System (CIS), with funds reserved for a project management consultant in an amount not-to-exceed $3,439,726 for a three (3) year term. Finance Director Williams presented the staff report. In response to Council questions, Finance Director Williams explained the selection of Tyler Technologies, the RFP process, end of life of current system, and online payments. Senior Information Technology Analyst Shehata explained the security systems used by Tyler Technologies. City Clerk Pope provided an update on the City’s website upgrade. MOTION Mayor Por Tem Ybarra moved and Council Member Gonzales seconded a motion to approve the Software as a Service Agreement with Tyler Technologies, Inc., in substantially the same form as submitted, for the purpose of an upgrade from the current Tyler ERP system (Eden) to a comprehensive ERP software system, which would include modules for Munis, EnerGov, Digital Health Department (DHD), and the Munis Utility Billing Customer Information System (CIS), with funds reserved for a project management consultant in an amount not-to-exceed $3,439,726 for a three (3) year term. The question was called and the motion carried unanimously. ORAL REPORTS City Administrator Reports on Activities and other Announcements. City Administrator Fandino provided an update on recent Police activity. Police Chief Miranda provided an update on the holiday activities on December 16, 2020. City Administrator Fandino reported on the Bandini Island upgrade; public utility outages; Housing Commission meeting December 9,2020,6:00 p.m.; COVID-19; and the transition of fire services to Los Angeles County. City Clerk Pope andHuman Resources Director Earl stated the Book Drive and Food Drive were ongoing. City Council Reports on Activities (including AB1234), Announcements, or Directives to Staff. Council Member Menke reported on her attendance at the National League of Cities Summit, November 18-20, 2020, at a total cost to the City of $250. Regular City Council Meeting Minutes Page 5 of 5 December 1, 2020 RECESS Mayor Lopez recessed the meeting to Closed Session at 10:20 a.m. CLOSED SESSION 12.CONFERENCE WITH LEGAL COUNSEL - EXISTING LITIGATION Government Code Section 54956.9(d)(1) A. Bicent (California) Malburg LLC et al. v. City of Vernon et al., Los Angeles Superior Court Case No. 19STCV08859 and JAMS Reference No. 1100107175 B. City of Vernon v. Bicent (California) Malburg LLC Los Angeles Superior Court Case No. 19STCP02411 and JAMS Reference No.1220062657 RECONVENE At 11:01 a.m., Mayor Lopez adjourned Closed Session and reconvened the regular meeting. CLOSED SESSION REPORT Interim City Attorney Alvarez-Glasman reported that the Council, with all five members present, met in Closed Session, discussed the items on the agenda, and took no reportable action. ADJOURNMENT Mayor Lopez adjourned the meeting at 11:02 a.m. ______________________________ LETICIA LOPEZ, Mayor ATTEST: _____________________________________ LISA POPE, City Clerk (seal) City Council Agenda Item Report Agenda Item No. COV-437-2020 Submitted by: Sandra Dolson Submitting Department: City Clerk Meeting Date: December 15, 2020 SUBJECT Claims Against the City Recommendation: Receive and file the claim submitted by Christina Cicione on behalf of State Farm Mutual Insurance a/s/o Leydi Y. Sanchez in the amount of $3,617.68. Background: On December 2, 2020, the City received the following claim: Name of Claimant Amount Demanded State Farm Mutual Insurance a/s/o Leydi Sanchez $3,617.68 Pursuant to Municipal Code Section 2.11-1, the above information is listed on the City Council agenda as soon after filing of the claim with the City as practical. Fiscal Impact: There is no fiscal impact associated with this report. Attachments: 1. 20201203 Cicione, C. - State Farm CLAIM FOR DAMAGES TO PERSON OR PROPERTY INSTRUCTIONS 1 . Claims for death, injury to person or to personal property must be filed not later than six (6) months after the occurrence. (Gov. Code Sec. 91 12)2. Claims for damages to realproperty must be filed not later than one (1) year after the occurrence. (Gov. Code Sec.911.2)3. Read entire claim before flling.4 See page 2 for diagram upon which to locate place of accident 5 This claim form must be signed on page 2 at bottom. 6. Attach separate sheets, iI necessary, to give Iull details. SIGN EACH SHEET7. Claim must be filed with City Clerk. (Gov.Code Sec. 915a) RESERVE FOR FILING STAMP cLArM No. [J]UIIII_f,LERl(',5 0FFICE RECEIUES IlEf,3'20 PE2:32ttE TO: CITY OF VERNON CITY COUNCIL e of Claimant State Farm Mutual lnsurance a/s/o Leydi Y Sanchez N/A eo man n person Home rCSS Claimant an tate me e ep one UM PO BOX 106172 Atlanta, GA 30348 877-787-8276 Business Address of Claimant same as above City and State usiness Telephone Number Give address to which you desire notices or communications to be sent regarding this claim Benson Legal APC 8550 Balboa Blvd, Suite 290, Northridge, CA 91325 How did OAMAGE or INJURY occur? Give full particulars. Vernon City worker allowed manhole cover to roll into our insured's vehicle, causing property damage. Vehicle was a 2018 HONDA CR-V with Calilornia license plate When did DAMAGE or INJURY occur? Give full particulars, date, time of day, etc. 0610312020 at 6:00 PM Where did DAMAGE or INJURY occur? Describe fully, and locateon diagram on reverse side ofthis sheet, where approximate, give street names and address and measurements from landmarks 3017 Bandini Blvd, Vernon, CA What particularACT oTOMISSION doyouclaim causedthe injury ordamage? Givenamesof Cityemployees, causingthe injury or damage, if known: Failure to maintain manhole cover so as not to cause damage to the property of another What DAMAGE or INJURIES do you claim resulted? Give full extent of injuries or damages claim ed property damage to deck lid/trunk, door, fender, quarter panel and rear bumper What AMOUNTdo you claim of each item of injury ordamage as of date of presentation of thisclaim, giving basis of computation: $3,617.68 ($2,861 .84 repair cost + $255.84 rental + $500 deductible) Give ESTIMATED AMOUNT as faras known you claim on account of each item of prospective injury or damage, giving basisof computation: $3,617.68 ($2,861 .84 repair cost + $255.84 rental + $500 deductible) if any, ere you insured at the time of the incidenl? lf so, provide name of insurance company, policy numbers anO arnount of insurance payments received: N/A - claimant is an insurance company. State Farm lnsurance Company, PO BOX 106172, Atlanta, GA 30348 Expenditures made on accounl of accident or lnjury: (Date - ltem) N/A (Amount) Name and address of Witnesses, Doctors and Hospitals NiA READCAREFULLY For allaccident claims place on following diagram names of streets, including North, East. South, and West: indicate place of accident by "X" and by showing house numbers or distances to street @mers. lf City Vehicle was lnvolved, designate by letter"A" location of City vehicle when you flrsl saw it,and by "B" location of yourself or your vehicle when you first saw City vehicle; location of City vehicle at time of accident by'A-1"and location of yourself or your vehicle at the time of accident by "8 1" and the point of lmpact by "X.' NOTE:lf diagrams do not fit the situation, attach hereto a proper diagram signed by claimant. FOR OTHERACCIDENTS CUnBI that the , includin a attachments is true and correct. Date: SIOEWALK I declare CURg under enal of f u Typed/Printed Name: Christina Cicione, Esq. 12t1t20 NOTE:ALL CLAIMANTS MAY BE REQUESTED TO AE EXAMINEOAS TO THEIR CLAIM UNOER OATH, PRESENTATION OF A FALSE CLAIM IS A FELONY (CAL PEN. COOE SEC,72), CLAIMS MUSTBE FILED WITH CITY CLERK (GOVCOOE SEC, S15a), STATE LAW PROVIDES THAT IFYOUARE NOT NOTIFIED OFANY ACTION BY IHE CTTY OF THIS CLAIM WITHIN 45 OAYS OF FILING THEN THE CLAIM IS DEEMED DENIED (SEE GOV, CODE SEC. 911,6 & 912.4) PAR AY Claimant or person filing on his/her behalf, givingre n Attorney for State Farm Sign rel p FOR AUTOMOBILE ACCIDENTS 7A @, For Customer Support refer to the appropriate platform below:LexisN CXIS'OrderPoint 800-934-9698 Orderpoint.support@lexisnexis.com Accurint for lnsurance 86&2774407 Accudntsupport@lexisnexis.com Lexis.com Law Firm &counts 800-543-6862 PAGE COUNT: 6 CLIENT: 6625 DIVISION : ADJUSTER : A9LECLAIM: 7507P0915 TRANSACTION # : 7O4342576L DATE : 07 ll5l2020 DATE OF LOSS : 0610312020 TIME OF LOSS : 0:0:0STREET: 3017 BANDINI BLVDCITY: VERNONCOUNTY: LOS ANGELESSTATE: CA INVESTIGATING AGENCY : REPORT NUMBER : REPORT TYPE : PARTY ], : PARfi 2 : PARTY 3 : CAR : CRV VERNON PD cR20200873 Auto Accident LEYDI Y SANCHEZ i4AKE : HONDA TAG : YEAR:2018 DRIVER LICENSE : ADDITIONAL INFO : NOTE: Police Report THANK YOU FOR YOUR ORDERI Worldle ID: Partshare: 621dr3d7 SRwyzL fueral ID: Resale Number: state EPA: BAR: 9r-19.14951 SRAF 102642587 c4r000401441 4RD278920 RO Number: 6476 written By: oaniel Jimenez, 71112020 ltl6t29 ?M Mjuster: Express Team U, (855) 34f-8184 Buslness Insuredi Type of Loss: Pdnt of Impad SANCHZ, LEYDI Comprehensive 05 Right Rear Policy *: Date of L6 Oaim *: Crays to Repair: 7m7PG91501 0 Iniur.nce @mpany: STATE FARI4 INSURANCE COI'1PANIEs 6/3/2020 6:00 Pl4 Osm€r: SANOIEZ, IEYDI Inspedon Locadon: RB PAINT & BOOY 10850 No.walk Blvd. Sanb Fe Springs, CA 90670 Repair Facility (562) 901-1 100 Busness Vehlde Drop Off Date: Repalr Completion Date: 06/m/2020 061t012020 Promlse Dat€: Vehicle Pick Up/Retu.n Date: 0611612020 06/10/2020 Repair Start Date:0610812020 VEHICLE 2018 HONo CR-V LX 4D UTV 4-2.41Gasoline Gasoline Direct lhjection BURGANoY BURGANOY vlN: 9427 Inteiorcolor: Ucense: 127 B(Mr color: State: C Produdirt Dab Mileage In: Mileage Out: Conditon: vehicle out: 5/1712020 lob *: 6139 IRAI{S tllsto]{ Autofl ratic Traninission POWER Pa {er Steerirc Power Bl-al(es Po{er l-ods OEOOR Dual Minols TlnEd Glass Console/Storage OverlEad Console OOM'E IE]ICE Air Co.dit onirc tntermitrert wipers nlt Whed clutse Control Rear Oefogger Keyless EnEy Message CenEr Steering \|,/h€el Touch Conds Rear Wndorv Wiper T€iescopic l^thed Oimate contsol Badup camera RADIO AM Radio FM RdIo Stereo searcwSeek A.xaliary Audb ConrEction SAFETY Ddvers SUe Air 8ag PderE€r Air 8ag AnU-Lod Brdk€s (4) 4 WtEel Disc B6kes Tretion Control Sbbility Conuol Front Sde lmpact Air Bags Head/Curtain ar Bags Hands Free Device SE TS cloth Seats Budet Seats Redining/l-ourEe Saats wHEEl.lS Aluminum/Alloy wheels PAlT Clear @at Paint OTHER RearSpoiler Estimates 71712020 r:16:29 PM 311359 Page 1 RB PAINT & BODY REI,AX WE WILL TAKE IT FROM HERE ! 10850 Norwalk Blvd., Santa Fe Springs, CA 90670 Phone: (562) 903-1100 F/U(: (562) 903-1104 Supplement of Recod 2 with Summary Supplement of Record 2 with Summary RO Number: 6476 2018 HOND CR-V LX 4D UTV 4-2.41Gasollne Gasoline Direct Iniectioo BURGANDY Line Op€r Descdption Part l{umber Qtv Extended Price 3 Labor Paint so2 so2 ,AUTTIORIZANON TO PAY SEO,RED, OWI{ER PROVIOED WIIH A @gY OF ESTIMAIE / RNAL BILL Four wheel alignmenl O/H rear bumper Bumper cover RT Sire cover Add fo. Oear Co.t Lo,ver aover w/viible odEust RT slde rcbirEr 2*1 3 5 6 1 8 9 r0 l1 12 14 15 16 17 18 19 20 21 22 23 24 # s02 # s01 REAR BUT,TPER Subl 85.00 x s 85.00 60.38 2.0 0.4 0.5 1.0 0.2 2.4 1.0 Repl Repl 71501LA400 o4TI2IL,a,00ZZ u5l5 20116 71510T14400 71593T1AA01 r05.59 14.88 2.4 Incl. Ind. Ind. 0.1 Repl Repl REAR LAI.,IPS R&l REAR BODY & FLOOR ' Rpr REAR SUSPEI{SIOTI S01 Repl S01 Repl QUARTER. PAI{EL * subl t RPr RT Tail lamp assy RT Rail rernl rear (UHS) 20.00 0.3 0.3 0.2 0.4 L0 RT Hub assy RT Kn*kle 42200Tt8A51 52210r4A02 155.30 m 164.20 m Ind. 2.1 M Four whed alignment RT Tail lamp po*et Add for Oea. coat RT Qrra.ter panel d1f wheeb Add lor Oear @at RT Wr€elhouse liner dlf wheeb RT Wheel opng mldg RT Protector l|/o Indiana built RT Quarter glass Hoida w/o p.l'v<y RT Inner gltEelhouse Orerlap Mino. Panel G|-ASS r(IT* ROOF R&t EXHAUST SYSTEH r Rpr tr subl # RePl # Repl Mumer & pipe w/o AWD +r.r.ADD-ONS.r*rr Hazardorrs waste removal Cover ca. R6tore @rosion Potectbn Primer Rpr Repl Repl Repl subl Rpr 1 L0 8,0 0.3 26 27 28 74413TLA401 744l2TMETo1 74552TLA400 19.33 21.00 20.00 x 29 30 3l 32 33 34 35 36 37 38 39 _r.0 .l.o 0.1 {.2 1 RT onp molding I 1 1 1 5.00 6.00 15.00 7 l7 12020 li76:Zg Pl4 311359 Pag€ 2 1 I I I 1 1 1 Supplement of Record 2 with Summary RO Number: 6476 2018 HONo CR-V l-X 4D UTV 4-2.41 Gasoline Gasoljne Dired lnjectjon BURGANDY 40 4l 42 43 45 RepL Fex additive bnt coloa pre scan dip feider RR R€0ector Trunk fl@k 1 1 I I 1 I 8.00 0.5 0.5 1"1 501 501 s01 24.56 77.95 2.35 46 47 OIHER GIARGES To ing 375.00 SUBTOTALS r,636.35 22.1 7.6 Crtegory Basis Rate cost s Parts Parts Dscount Body tabot Paint lrbo. MedEnkal Labor Paint grpplies Misaellaneols Other Orarues -5.0 % $ 44.00 /tY t .14.00 /hr J 53.00 /h. t 34.00 /hr 1,176.35 -29.33 858.00 334.40 163.80 258.40 85.00 375.00 $ 586.54 19.5 h6 @ 7.6 hrs @ 2.6 hrs @ 7.6 h6 @ subtotal Sales Tax $ 1,33s.42 @ 10.5m0 % Grand Total Ded!cbble CUSTOI.TER PAY INSURANCE PAY Register online to dECk the sabrs of yoor daim and #y conneced wth sEte Fam@. To regi*er, go to htbr/www.statefarm.com/ and select ClEck Ule Status of a Oaim. lf you are alreidy regi$ered. thank yotl! 3,227.62 740.22 3,351.44 500.00 500.00 2,a61.84 71712020 r'.r6t29 PM 111359 Page 3 ESTIMATE TOTALS Supplement of Record 2 with Summary R.O umb€r: ff76 2018 HOND CR-v tx 4D Ury 4-2,41Gasoline Gaoline Direct Iniedion BURGANDY SUPPLEMENT SUMMARY Line Op€r Labor PaintDescriptionPart umb€r aW Extend€d Price * * 2 3 s02 s02 s02 .AUT}ORIZAIION TO PAY SEq,lRED, OWNER PROVIDED WITH A @PY OF ESTIMAIE / FIML BITI suaToTALs o.00 o.0 0.o TOTALS SUMMARY cat€gory Basis Rate cost $ Paats 0.00 Subtotal 0.00 CUMULATIVE EFFECTS OF SUPPLEMENT(S) ECimaE Supplement g)1 Supdern€nt S02 2,846.00 515.84 0.00 O6nal Jimenez Daniel Jimen€z Danrel larnenez JobTotal: CUSTOI,IER PAY: IHSURAT{CE PAY: 3,361.84 s00.00 2,861.84 t t $ 7 l7 12020 tt16:29 Pt4 311359 Page 4 Added Items I 1 1 Supplement of Record 2 with Summary RO Number: 6476 2018 HOND CR-V Lx 4D UTV 4-2.41Gasoline Gasolane Direct Inje.tion BURGANDY FOR YOUR PROTECnON CAUFORNIA LAW REQUIRES THE FOLLOWING TO APPEAR ON THIS FORM: ANY PERSON WHO KNOWINGLY PRESENTS FALSE OR FRAUDULENT CLAIM FOR THE PAYN4ENT OF A LOSS IS GUILW OF A CRIME AND MAY BE SUB]ECT TO FINES AND CONFINEI'4ENT IN STATE PRISON. THE FOLLOWING IS A UST OF ABBREVIANONS OR SYMBOLS THAT MAY BE USED TO DESCRIBE WORK TO BE DONE OR PARTS TO BE REPAIRED OR REPLACED: MOTOR ABBREVIATIONS/SYNIBOLS: D=DISCONTINUED PART, A=APPROXMATE PRICE. LABOR TYPES: B=BODY LABOR, D=DIAGNOfiC, E=ELECTRICAL, F=FRAME, G=GLASS, M=MECHANICAL, P=PAINT I-ABOR, S=STRUCTURAL, T=TAXED MISCELLANEOUS, X=NON TAXED MISCELLANEOUS. CCC ONE: ADJ=ADJACENT, ALGN=AUGN, Iy'M=AFTERMARKET, BLND=BLEND, CAPA=CERTIFIED AUTOMOTIVE PARTS ASSOCIATION, D&R=DISCONNECT AND RECONNECT, EST=ESTIIIATE, EXT, PRICE=UNIT PRICE MULTIPUED BY THE QUANITY, INCL=INCLUDED, MISC=MISCELLANEOUS, NAGS=NATIONAL AUTO GLASS SPECIFICATIONS, NON-ADJ=NON ADJACENT, O/H=OVERHAU! OP=OPERATION, NO=UNE NUMBER, QTY=QUANITI'/, RECOND=RECONDITION, REFN=REFINISH, REPL=REPLACET R&I=REMOVE AND INSTALL, R&R=REI'IOVE AND REPLACE, RPR=REPAIRI RT=RIGHTI SECT=SECTION' SUBL=SUBLET, LT=LEFT, WO=WITHOUT, W_=WTTH/_ SYMBOLS: #=NIANUAL LINE ENTRY, *=OTHER IIE..I4OTORs DATABASE INFORMATION WAS CHANGED], *I'=DATABASE LINE WITH AFTERMARKET, N=NOTES ATTACHED TO UNE. OPT OEIVI=ORIGINAL EQUIPMENT MANUFACTURER PARTS EITHER OPNONALLY SOURCED OR OTHERWISE PROVIDED WITH SOME UNIQUE PRICING OR DISCOUNT. ,CURE TIME' MEANS THE LENGTH OF TIME THAT, PER THE ADHESIVE MANUFACTURER, THE WNDSHIELD ADHESIVE NEEDS TO CURE UNTIL THE WINDSHIELD CAN PROPERLY FUNCTION A5 A SAFETY DEVICE PURSUANT TO THE FEDERAL MOTOR VEHICLE SAFETY STANDARDS AND THE VEHICLE MANUFACTURERS SPECIFICATIONS' 717/2020 1176t29 PM 311359 Page 5 Supplement of Record 2 with Summary RO Number: 6475 20rg HOND CR-v t)( 4D UTV +2.41Gasollne Gasoline oired Inie<tion BURGANDY Estmate based on MOTOR CRASH ESTIMATING GUIDE and potentially other third party sources of data. Unless otherwise noted, (a) all items are d€rived fmm the Guide ARG4464, CCC Data Date 0201/2020, and potentially other $ird party sources of data; and (b) the parb presented are OEM-parts. OEM parG are manufachrred by or for the vehicle's Original Equipment Manufacturer (OEM) according !o OEM'S specifications for U.S. distribuuon. OEM parts are available at Oryehicle dealeEhips or the specified supplier. OPf OEM (Optional OEM) or ALT OEM (Alternative oEM) parts are oEM parts that may be provided by or though alternate sources od|er than the oEM vehicle dealeEhips with discounted pricing. Asterisk (*) or Double Asterisk (**) indicates that the parts and/or labor data provided by third party sources of data may have been modified or may have come from an alternate data source. Tilde sign (-) items indicate MoToR Not-Included Labor operations. The symbol (<>) indicates the refinish opection WILL NOT be performed as a separdte procedure from the other panels in the estimate. Non-Original Equipment Manufacturer aftermarket parts are described as Non OEM, A/M or NAGS. used parts are described as LKe, RCy, or USED. Reconditioned parts are described as Recond. Recored parts are described as Recore. NAGS part Numbers and Benchmark Prices are provided by Nauonal Auto Glass Sp€cifications. Labor operauon times listed on the line with the NAGS information are MOTOR suggested labor operation times. NAGS labor operauon times are not included. Pound sign (#) items indicate manualentries. Some 2021 vehicles contain minor changes from the previous year. For those vehicles, prior to receiving updated data from the vehicle manufacturer, labor and parts data from the previous year may be used. The ccc oNE estimator has a list of applicable vehicles. Parts numbers and prices should be confirmed with the local dealeBhip. The folloy/ing is a list of additional abbreviations or symbols that may be used to describe work to be done or parts to be repaired or replaced: SYMBOE FOLLOWING PART PRICE: m=MOTOR Mechanical component. S=MOTOR Structural component. T=Ntiscellaneous Taxed charge category. x=Miscellaneous Non-Taxed charge category. SYT4BO6 FOLLOWING LABOR: D=Diagnostic labor category. E=Electrical labor category. F=Frame labor category. G=Glass labor category. M=Mechanical labor category. S=Structural tabor category. (numbers) 1 through 4= Ljser Defined Labor Categories. OTHER SYMBOLS AND ABBREVIATIONS: Adj.=Adjacent. Algn.=Align. ALU=Aluminum. A/M=Aftermarket part. Blnd=Blend. BoR=Boron steel' Clil=Certified eutomotive parts Association. D&R=oisconnect and Reconnect. Hss=High strength Steel. HYD=Hydroformed steel. Incl.=Included. LKQ=Like Kind and Quality. LT=left. MAG=Magnesium. Non-Adj'=Non nO.pceni. NSf=nSf tntemational Certified Part. O/H=Overhaul. Qty=Quantity. Refn=Refinish. Repl=Replace. R&I=Remove and Install. R&R=Remove and Replace. Rpr=Repair. RT=Right. sAs=sandwiched steel. sect=section. subl=sublet. uHs=ultra High Strength steel. N=Note(s) associated v{ith the estimate line. CCC ONE Estimating - A product of CCC Information Services Inc' The following is a list of abbreviations that may be used in ccc oNE Estimating that are not part of the MoToR CRASH ESTIMATING GUIDE: BAR=Bureau of Automotive Repair. EPA=Environmental Protection Agency. NHTSA= National Highway Transportation and safery Administration. PoR=Paintless Dent Repair. vIN=vehicle Identification Number' 7 17 IZO2O ltr6t29 PM 311359 Page 6 RB PAINT & BODY RELAX WE WILL TAKE 1T FROM HERE ! 10850 Norwalk Blvd., Santa Fe Sprinqs, CA 90670 Phone: (562) 903-1100 F/{(: (562) 903-U04 supplement of Record I with Summary F€der3llD: Resale Number: State EPA: &lR: 621d13d7 5Rwfzl 91-1944951 sRAP-102642587 cA1000401441 ARD278920 Workfile lD Partsshare RO Number; 6476 written By: Daniellimenez, 6/172020 2:51:36 th': Adjuster: Express Telm U, (855) 141-8184 Business Insured: SANCHEZ, tf/Dl Type of toss: comprehensive Point of lmpa.t 05 Right Rear Policy #: oate of toss Chim #i Days to Repair: 75-07P0-91S01 0 Insurance @mpany: SIATE FARM INSUMNCE COMPANIES 6/3/2020 6:00 Pl4 Ownel: SANCflZ. ISYDI Inspection Locaton: RB PAINT & EODY 10850 No alk Btud. S,anta Fe Springt Cl 90670 Repair Facility (562) 903-l 100 Business vehide Drop otf Date: 06/08/2020 Promise Date:0611612020 Repair Start oate:o6/08/2020 VEHICLE 2018 HONO CR-V LX 4D UTV 4-2.41 Gasoline Gasoline Direct Injedjon BURGANDY VIN: License state: 427 lnteriorColor: 27 Exterior Color: OA Prcducton Date: l4ileage ln: Iqileage Out: Condition: vehrcle out: 6/16/2020 lob *: 5139 BURGANDY TRAi{Sl.rrsslo Automatic Transmission POWER Power Steering Power Brakes DECOR Dual Mirrors Tinted 6lass Console/Storage Ovehead Console cot{vEirrEr{cE Air Cohdiuoning Intermrttent Wipers Tllt Wheel Cruise ConBol Rear Defogger Ke"yless Entry Message Center steenm Wheel Touch controls Rear Window Wiper Tdescop,c wheel Climate Control Backup camera RADIO Ar1 Radio Flrl Radio Stereo 5€arch/Seek Aoiliary Audio Connection SATETY Drivers Side Air 8ag Passenge. Air Bag AnU-Lock Brakes (4) 4 wheel Disc BEkes TEtron Control Stability contsol Front Side Impact Air Bags Head/Curtain Air Ba95 Hands Free Deviae SEATS Cloth Seats Eucket SeaE ReclinirE/Lounge Seats WHEEl.s Aluminum/Alloy Wh€els PAIt T Clear Coat Paint OTHER Rear Spoiler 6/1712020 2r51r36 PM 311359 Page I Supplement of Record 1 with Summary RO umber:6476 2018 HOND CR-V tX 4D UTV 4-2.41Gasotine Gasotine Direct Injedjon zuRGANDy Line Oper Description Part l{umber Qtv Price i Labor Paint L*g)1 Subl Four wheel alignment 85.00 x 1 I 2 3 5 6 7 I REAR AUMPER Repl Repl O/H rear bumper Bumper cover RT Side cover Md for Clear Coat lower cover w/vigble exhaust RT Side retairEr 71501T14400 M772ILAAWZZ 17515 20116 2.4 Incl. Incl. 71510T14400 71593I4A01 105.s9 14.88 2.0 0.4 Repl Repl Inci. 0.1 9 10 REAR I.A}TPS R&I RTTail lamp assy 0.3 11 t2 REAR BODY & FLOOR Rpr RT Rail reinf rear (UHS)!s 0.5 1l t4 15 REAR SUSPE]{SIOII SOI Repl RT Hub assy $1 Repl RT Knuckle 422mrBA51 52210TI-AA02 156.30 m 164.20 m Incl. 2.1 M I 1 16 t7 18 19 20 2l 22 23 24 25 26 27 28 QUARTER PANEL # subt* Rpr Four wheel alignment RT Tail lamp pocket Add for Clea. Coat RTQuarter panel V17' wheels Add for clear Coat RT Wheelhouse liner V17" RT Wheel opng mldg RT Protector Vo Indiana built RT Quarter glass Honda w/o RT Inner wheelhouse Overlap Minor Panel GLASS KJT 74413Tt4A01 744t2TMETo1 19.33 2r,00 20.00 x 85.00 60.38 20.00 1.0 o.2 1.0 Rpr Repl Repl Repl Subl Rpr al !.! 0.3 0.3 0.2 L0 1 1 I 74552TLAA00 -0.2 1 29 30 ROOF R&l RT orip molding 0.4 3l 32 33 34 35 36 37 38 39 40 EXHAUST SYSTEI,I * Rpr # Subl # Repl # Repl Muffler & pipe Vo AWD Hazardous waste removal Cover Car Restore Conosion Protection Primer tint color pre Scan clip fender 1n I 1 1 1 1 1 1 I Repl 5.00 6.00 16.00 s01 8.00 0.5 0.5 t4 6177ln21 2:57136 Pl4 311359 24.56 Page 2 1 s Supplement of Record I with Summary RO Number: 6476 2018 HON0 CR-V LX 4D UTV 4-2.41Gasoline G.soline orrect lnjection EURGANDY 41, 42 s01 s01 RR Reflector Trunk Hook OTHER C}IARCES Towinq 1 1 t7.95 2.35 43 1 375.00 SUBTOTALS 1,635,35 22.1 7.6 ESTIMATE TOTALS c.tegory Rate Cost $ Parts Parts Discount Body tabor Paint Labor I,lechanical Labor flaint Supplie,s Misceilaneous Other Charges -5.0 % I 44.00 /hr I ,H.00 /hr i 63.00 /hr 3 34.00 /hr $ 586.54 19.5 hrs @ 7.6 hls @ 2.6 hrs @ 7.6 h6 @ 1,176.3s -29.33 858.00 334.40 163.80 258.40 85.00 375.00 SubtoEl Sales Tax 11,335.42 @ r0.5m0 % Grand Total Dedudible CUSTOHER PAY INSURANCE PAY Register ontine to ch€ck O€ sbtus of your claim and stay conrlecH with State Fann@. To register, 90 to httpJ/wvYw.sGtefarm.com/ and selett Check he stabis of a Claim. If you are already registered, thank you! 3,22t.62 t40_22 3,361.84 500.00 500.00 2,46L,44 6lt7l2o20 2:Stt36 PM 111359 Page 3 Basis Supplement of Record I with Summary RO Number: 5476 2018 HoND cR-V Lx 4D UTV 4-2.41Gasoline Gasoline Direct Injection BURGANDY SUPPLEMENT SUMMARY Line Op€r Lahr PaintDescriptionPart l{umb€r aty Extended 36# Price Subl Foor wheel alignrEnt I {5.00 X NOTEi RIGHT REAR WHEEL IS rINCH OFF FROM WHEEL HOUSE. wItI SEND TO AUGNMENT TO CONFRIM DAMAGB l€ VISABTI S{ISPE{SIOI{ DAI'IAGE I l3 14 15 40 4L # S01 Subl RE R SUSPEI'SIOII S,01 Repl $1 RePl # 501 # sol # sol RT Hub assy RT Knuckle dip fender RR Refrector Trunk Hook Four wheel alignment 85.00 x 42200T[AA5l 52210TtAA02 156.30 m 164.20 m 24.56 17.95 2.35 I.d. 2.1 M I 1 8 I I SUATOTALS 365.36 2,L 0.0 TOTALS SUMMARY Cat€gory 83sis Rate cost $ Partt Parts oiscount Mechanical Labor I 365.36 2.1 hrs @ -5.0 95 t 63.00 /hr 365.36 -18.27 132.10 Sublotal 479.39 Sales Tax Addlboml Supple.nent Tarcs t 347.09 @ 10.5m0 %36.44 0.01 Total supplement lrnount 51s.84 '{ET COST OF SUPPLEHEI{T 515,84 CUMULATIVE EFFECTS OF SUPPLEME'{T(S) Estimate SupplerErt S01 2.846.00 Daniellii€nez 515.84 Daniellitnenez ,ob Total: CUSTO ER PAY: I'{SURANCE PAY: 3,361.84 500.00 2,861,84 $ I t 6/17/2020 2:51r36 m{311359 Page 4 Oeleted Items Added ltems Supplement of Record I with Summary RO l{umber: 5476 2018 HOID CR-v u 4D UTV +2.41Gasoline Geline Dne.t Inie(tion BT RGANDY FOR YOUR PROTECNON CAUFORNIA LAW REQUIRES THE FOLLOWNG TO APPEAR ON THIS FORM: ANY PERSON WHO KNOWINGLY PRESENTS FALSE OR FRAUDULENT CLAIM FOR THE PAYMEI.JT OF A LOSS IS GUILTY OF A CRIME AND MAY BE SUB]ECT TO FINES ANO CONFINEMENT IN STATE PRISON. THE FOLLOMNG IS A UST OF ABBREVIATIONS OR SYI,4BOLS THAT [4AY BE USED TO DESCRIBE WORK TO BE DONE OR PARTS TO BE REPAIRED OR REPI.ACED: N1OTOR ABBREVIATIONS/SYMEOLS: D=DISCONINUED PARI A=APPROKMATE PRICE. LABOR TYPES: B=8ODY LABOR, D=DIAGNOSTIC, E=ELECTRICAL, F=FRAI.4E, G=GLASS, M=MECHANICAL, P=PAINT LABO& S=STRUCTURAL, T=TAXED MISCELLANEOUS, X=NON TAXED MISCELLANEOUS. CCC ONE: ADJ=AOJACENT, ALGN=AUGN, A/M=AFIERMARKET, BLND=BLEND, CAPA=CERTIFIED AUTOMOTIVE PARTS ASSOCIATION, D&R=DISCONNECT AND RECONNECT, EST=EfiI4ATEI Efi. PRICE=UNTT PRICE MULTIPUED BY THE QUANflTY, INCL=INCLUDED, MISC=MISCELI,ANEOUS, NAGS=NATIONAL AUTO GLASS SPECIFICAIIONS, NON-ADJ=NON ADJACENT, O/H=OVERHAUL, OP=OPERATION, NO=LINE NUMBE& QTY=QUANTITY, RECOND=RECONDITION, REFN=REFINISH, REPL=REPLACE, R&I=REMOVE AND INSTAI.I, R&R=REMOVE AND REPLACE, RPR=REPAI& RT=RIGHT, SECT=SECTION, SUBL=SUBLET, LT=LEFT, WO=WITHOUT, W-=WITH/- SYMBOLS: #=MANUAL UNE ENTRY, *=OTHER [IE..NIOTORS DATABASE INFORI4ATION WAS CHANGED], **=DATABASE UNE WITH AFTERMARKET, N=NOTES ATTACHED TO UNE. OPT OEM=ORIGINAL EQUIPMENT MANUFACTURER PARTS EITHER OPTIONALLY SOURCED OR OTHERMSE PROVIOED WITH SOME UNIQUE PRIC]NG OR DISCOUNT, .CURE TIME' I4EANS THE LENGTH OF TIME THAT, PER THE ADHESIVE MANUFACTURER, THE WINDSHIELD ADHESIVE NEEDS TO CURE UNTIL THE WINDSHIELD CAN PROPERLY FUNCIION AS A SAFETY DEVICE PURSUANT TO THE FEDERAL MOTOR VEHICLE SAFETY STANDAROS AND THE VEHICLE MANUFACTURER'S SPECIFICATIONS. 61t712020 2ts1t36 Pt4 311359 Page 5 Supplement of Record I with Summary RO umber:6476 20rg HOND CR-V t)( 4D UTV 4-2.41Gasoline Gasoline oirect lniection BI,RGANDY Estimate based on MOTOR CRASH EfiMATlNG GUIDE and potentially other third party sources of data. Unless othenrise noted, (a) all items are derived from the Guide AR@464, CCC Data Date 06/16/2020, and potentially other third party sources of data; and (b) the parE presented are OEM-parts. OEM parts are manufactured by or for the vehicle's Original Equipment Manufacturer (OEM) according to OEM'5 specifications for U.S. distribution. OEM parts are available at OE/Vehicle dealerships or the specified supplier. OPT OEM (Optional OEM) or ALT OEM (Alternative OEM) parts are OEM parts that may be provided by or through alternate sources other than the OEM vehicle dealeEhips with discounted pricing. Asterisk (*) or Double Asterisk (**) indicates that the parts and/or labor data provided by third party sources of data may have been modified or may have come from an alternate data source. Tilde siqn (-) items indicate MOTOR Not-Included Labor operations. The symbol (<>) indicates the refinish operation WILL NOT be performed as a separate procedure ftom the other panels in the estimate. Non-Original Equipment Manufucturer aftermarket parts are described as Non OEM, ,y'14 or NAGS. Used parts are described as LKQ, RCY, or USED. Reconditioned parts are described as Recond. Recored parts are descrjbed as Recore. NAGS Part Numbers and Benchmark Prices are provided by National Auto Glass Speciflcations. Labor operation times listed on the line with the NAGS information are I4OTOR suggested labor operation times. NAGS labor operation times are not included. Pound sign (#) items indicate manual entries. Some 2020 vehicles contain minor changes from the previous year. For those vehicles, prior to receiving updated data from the vehicle manufachrrer, labor and parts data from the previous year may be used. The CCC ONE estimator has a list of applicable vehicles. Parts numbers and prices should be confirmed with the local dealechip. The following is a list of additional abbreviations or symbols that may be used to describe work to be done or parts to be repaired or replaced: SYMBOLS FOLLOWING PART PRICE: m=I'4OTOR Mechanical component. s=I'1OTOR Structural component. T=Miscellaneous Taxed charge category. X=Miscellaneous Non-Taxed charge category. SYMBOLS FOLLOWING LABOR: D=Diagnostic labor category. E=Electrical labor category. F=Frame labor category. G=Glass labor category. M=l'lechanical labor category. S=Structural labor category. (numbers) 1 through 4=User Deflned Labor Gtegories. OTHER SYMBOLS ANO ABBREVIATIONS: Adj.=Adjacent. Algn.=Align. ALu=Aluminum. A/I4=Aftermarket part. Blnd=Blend. BOR=Boron steel CAPA=Certified Automotive Parts Association. D&R=Disconnect and Reconnect. HSS=High Strength Steel. HYD=Hydroformed steel. Incl.=Included. u<Q=Uke Kind and Quality. LT=1eft. NIAc=f4agnesium. Non-Adj.=Non Adjacent. NSF=NSF International Certjfied Part. O/H=Overhaul. qy=quantitV. Refn=Refinish. Repl=Replace. R&J=Remove and Install. R&R=Remove and Replace. Rpr=Repair. RT=Right. SAs=sand',Yiched Steel. Sect=Section. Subl=Sublet. UHS=Ultra High Strength Steel. N=Note(s) associated with the estimate line. CCC ONE Enimating - A product of CCC Informauon Servic6 Inc. The following is a list of abbreviations that may be used in CCC ONE Estimating that are not part of the |.4OTOR CRASH ESNMATING GUIDE: BAR=Bureau of Automotive Repair. EPA=Environmental Protection Agency. NHTSA= National Highway Transportation and Safety Administration. PDR=Paintless Dent Repair. VIN=Vehicle Identification Number. 611112020 2)Stt36 PM 311359 Page 6 RB PAINT & BODY RELAX WE WILL TAKE IT FROM HERE ! 10850 Norwalk Blvd., Santa tu Springs, CA 90670 Phone: (562) 903-1100 FAX: (562) 903-1104 Estimate of Record Wo*file lD: Partsshare: 621d13d7 5RltyzL Federal ID: R€rale Number: state EPA: 8AR: 91,19.44951 SRAP-102642587 cAL000401,r41 ARD278920 WriEen Byr Daniel Jimenez. 6/9/2020 1155:49 PM Adjuster: Erpress Team U, (855) 341-8184 Busjness Insurcd: SAI,ICHA, IEYDI Type of Loss: Compreheflsive Polnt of lmpad: 05 Rjght Rear Policy #: Date of Loss: 6/3/2020 6:00 PM RO Number: 6476 vehid€ Drop Off Oater 061c8.12020 P.omls€ Date: Claim r: Days to Repairj 7H7P&91S01 0 lnsur.nce @mFany: SIA'IE FARM INSURANCE COMPANIES Ouncn SAI{ctIEz, EYDI lnsp€cdon Lo<adon! RB PAINT & SOOY 10850 Nomalk Blvd. Santa Fe Springt cA 9$70 Repair Faciliry (562) 903-1100 Busjness 0611612020 Repairst rt o.te:0610812020 VEHICLE 2018 HONO CR-V l.J( 40 UTv +2.41 G.soline G.soline oir€ct Iniedioo BURGAIoY vlN: 9427 lnterior Color: Uc€os€: 127 Eceriorcolor: BURGANDY Stater Cl PrDduction Oate: Mileage Inr Mileage Out: coodiUonl 6ll61m20 6139 Veh cle Out lob f TRANSHIS$ON Autoamtic Transmission POWER PorJer Steering Power Brdles DECOR Dual Mirro6 Tinted Glass Consol€y'Storaqe Overhead Congoh corvErtEt{cE ,rir Coriltihing Intarmitteot Wipers Iilt Wh€C Ouise Contsd Rear Defogger Keyless EnW Message Ct,lEr S&rilE lt4E€l Toudr Contsoh Telescopt Wheel OirnaE Contsd Backup Camera n Dto AM Radio Ft'l R.dio SEreo Seard/S€ek Auriliary Audio Coonection SAFETY Orivers Sirle Air 8ag Peng€r,fi Bag AnU-Lod Brak€s (4) ,t Wt|e€l Disc Brakes Tradion Cootsol SBbility Contol front Side Impact Ar Bags Head/Curtaln Ajr Bags Hands Fr€e Device SEATS Oo$ Seats Buckel Seats Redining/Lounge SeaE wlt;ELs AluminunvAtloy wheels PAlI{T Clear Coat Paint OTHER Rear Spdler 5/9/2020 1:55:a9 PM 311359 Page 1 Estimate of Record Ro Number: 6476 2018 HO10 CR-V LX 4D Uw 4-2.41Gasoline Gasoline Direc Iniedioo ELRGAi{DY Line Op€r D€scription Part Numb€r QtY Extend€d Pric€ t Labor Paint 1 2 3 4 5 6 7 I 9 l0 l1 t3 l4 l5 16 77 18 22 23 24 26 27 28 29 30 31 32 33 34 35 36 REAR. BUI,IPER REAR LAI,IPS 19 20 27 O/H rear bumper Eumper cover RT sid€ co\,,er Add for Oear coat Lovrer cov€r Vvidble exhau* RT Side rcbir|er Repl Repl 7l50lTLtAoo M7tzlt}rcoz u6-t5 20116 lnd. lncl. 7151oTlAAm 71593TLAA0r 105.59 14.88 lrd. 0.r Repl Repl 2.0 0.4 0.5 R&I RT Taillamp assy 0.3 l,o L0 8,0 0.3 REAR BODY E FLOOR ' Rpr QUARTER PAt{EL * Subl ' Rpr RT Rail reinf rear (UHS) RT Dnp molding 74413TLAAol 744t2TMETol 74552T14400 19.33 21.00 20,.@ x 0.3 0.2 Four wheel alilnment RT Tail lamp pocket Add for clear coat RT Quaner panel Vlf wheeb Add for Oear Coat RT wheelhouse ljner rU" RT Wred opng mldg RT Protector w/o Iodiana built RT Quarter glass Honda w/o priy&y RT Inner wheelhous€ Ovedap Minor Panel GLASS KIT ROOF R&l EXHAUST SYSTEX ' Rpr * * Subl * RePl # Repl Muffier & pipe Vo AWo *.*,rADD_oNS**1** Harardous waste rermval @v€Y Car tleatore Cono6ion ttotectbfl Primet Flex additive Unt color prc s@n Four whe€l alignrEnt Rpr Repl Repl Repl Subl Rpr 85.00 60.38 20.00 1.0 0.2 2.4 1.0 l.a 0t {.2 1 0.4 r.0 5.00 6.00 16.00 1 I I I s Repl Subl 8.00 85.00 x 0.5 0.5 M Not€: RIGHT REAR WHEEL Is llNcll OFF FROM WHEEL llOUSE. WIII SEND TO AUGNMENT TO CONFRIM OAMAGES NO VISAELE SUSPENSION DAMAGE OTHER C1IARGE5 Towinq 6/9/2020 r:55:49 PM 311359 375.00 Page 2 37 38 I 1 1 1 5 I I I I Estimate of Record RO Numb€r: 6476 2018 HONO CR-V LX 4D UTV 4-2.41Gasoline Gasoline Drrect lnjedion SURGANDY SUATOTAI.S 1,270.99 20,0 ESTIMATE TOTALS Category 8asi6 Rat€c.sr $ Parb Parts Discount Body t bor Paint Labor Mechanical Labor Paint Supplias Misaellaneous Other Orarges 1221.18 19.5 hrs 7.6 hrs 0.5 hrs 7.6 hrs -5.O % $ 44.00 /hr i 44.00 /hr $ 63.00 /hr $ 34,00 /hr @ @ @ @ 810.99 -11.06 858.00 334.40 31.50 258.40 85.00 375.00 subtotal 2,742.23 Sales Tax t 988.31 @ 10.5m0 %r03.17 2,846.00 5@.00 500.00 II{SURAIICE PAY 2,3,15.O0 Regaster online to check tlE sbtus of your daim and stay conneded with State FamO. To register, 90 !o httpj/lvyvw.statefarm.com/ .nd select Check the St tus of a Oaim. If you are alrendy registrred. thank you! FOR YOUR PROTECTION CAUFORNIA LAW REQUIRES THE FOLLOWING TO APPEAR ON THIS FORM: ANY PERSON WHO KNOWINGLY PRESENTS FALSE OR FRAUDULENT CLAIM FOR THE PAYI1ENT OF A LOSS IS GUILTY OF A CRIME AND T,IAY 8E SUBJECT TO FINES AND CONFINEI.4ENT IN STATE PRISON. THE FOLLOWING I5 A UST OF ABBREVIATIONS OR SYMBOLS THAT MAY 8E USED TO DESCRIBE WORK TO 8E DONE OR PARTS TO BE REPAIRED OR REPLACED: MOTOR ABBREVIATIONS/SYMBOLS: D=DISCONTINUED PART, A=APPROXIMATE PRICE. LABOR TYPES: B=BODY LABO( D=DIAGNOSTIC, E=EI"-ECTRICAL, F=FRAME, G=GLASS, I4=MECHANICAT P=PAINT LABOR, S=STRUCTURAI. T=TAXED MISCELLANEOUS, X=NON TAXED I'IISCELIANEOUS. CCC ONE: ADJ=ADJACENT, ALGN=AtlGN, A/M=AFTERI'1ARKET, BLND=BLEND, CAPA=CERTIFIED AUTOMOTIVE PARTS ASSOCIATION, D&R=DISCONNECT AND RECONNECT, EST=ESTIMATE, EXT. PNCE=UNIT PRICE MULTIPUED BY THE QUANTITY, INCL=INCLUDED, MISC=MISCEI.LANEOUS, NAGS=NATIONAL AUTO GLASS SPECFICATIONS, NON-ADJ=NON ADJACENT, O/H=OVERHAUI OP=OPERATION, NO=UNE NUMBE& QTY=QUANTITY, RECOND=RECONDiTION, REFN=REflNISH, REPL=REPLACE, R&I=REMOVE AND INSTAI.I, R&R=REMOVE AND REPLACE, RPR=REPAI& RT=RIGHT, SECT=SECTION, SUBL=SUBLET, LT=LEFT, WO=WITHOUT, W_=WrrH/_ SYMBOLS: #=MANUAL UNE ENTRY, *=OTHER IIE..MOTORS DATABASE INFORMAION wAS CHANGED], '*=DATABASE UNE WITH AFTERIUARKET, N=NOTES ATTACHED TO UNE, OPT OEM=ORIGINAL EQUIPMENT MANUFACTURER PARTS EITHER OPNONAI,I.Y SOURCED OR OTHERWISE PROVIDED WTTH SOI'4E UNIQUE PRICING OR DISCOUNT. "CURE TIME" MEANS THE LENGTH OF TIME THAT, PER THE ADHESIVE I4ANUFACTURER, THE WINDSHIELD ADHESIVE NEEDS TO CURE UNTIL THE WINDSHIELD CAN PROPERLY FUNCTION AS A SAFETY DEWCE PURSUANT TO THE FEDERAL MOTOR VEHICLE SAFETY STANDARDS AND THE VEHICLE MANUFACTURER'S SPECIFICATIONS. 6/9/2020 1:55:a9 PIa 111359 Page 3 7,6 Grand Total Huctible CUSTOi{ER PAY Estimate of Record RO Numb€r: 5476 2018 HOND CR-V Lx 40 UTV 4-2.41Gasoline Gasoline oirect Injection EURGANoY Estimate based on MOTOR CRASH ESTIMATING GUIDE and potentially other third party sources of data. Unless otherwise noted, (a) all items are derived from the Guide ARG4464, CCC Datn Date 06/0U2020, and potentially other third Frty sources of data; and (b) the parts presentd are OEM-parts. OEM parts are manufactured by or for the vehicle's Original Equipment Manufacturer (OEM) according to OEM'S spe{ifications for U.S. distribution. OEM parts are available at OE/Vehicle dealerships or the specified supplier. OPT OEM (Optional OEM) or ALT OEM (Alternative OEM) parts are OEM parts that may be provided by or throuqh alternate sources other than the OEM vehicle dealeBhips with discounted pricing. Asterisk (*) or Double Asterisk (**) indicates that the parts and/or labor data provided by third party sources of data may have been modified or may have come from an alternate data source, Tilde sign (-) items indicate MOTOR Not-Included Labor operations. The symbol (<>) indicates the refinlsh operation WILL NOT be performed as a separate procedure from the other panels in the estimate. Non-Original Equipment Manufacturer aftermarket parts are described as Non OEM, A,/M or NAGS. Used parts are described as LKQ, RC/, or USED. Reconditioned parts are described as Recond. Recored parts are described as Recore. NAGS Part Numbers and Benchmark Prices are provided by National Auto Glass Specifications. Labor operation times listed on the line with the NAGS information are MOTOR suggested labor operation times. NAGS labor operation times are not included. Pound sign (#) items indicate manualentries. Some 2020 vehicles contain minor changes from the previous year. For those vehicles, prior to receiving updated data from the vehicle manufacturer, labor and parts data from the previous year may be used. The CCC ONE estimator has a list of applicable vehicles. Parts numbers and prices should be confirmed with the local dealership. The following is a list of additional abbreviations or symbols that may be used to describe work to be done or parts to be repaired or replaced: SYMBOLS FOLLOWING PART PRICE: m=MOTOR Mechanical component. s=MOTOR Stsuctural component. T=Miscellaneous Taxed charge category. X=Miscellaneous Non-Taxed charge category. SYMBOLS rcLTOWlNG LABOR: D=Diagnostc labor category. E=Electical labor category. F=Frame labor category. G=Glass labor category. M=Mechanical labor category. S-Structural labor category. (numb€6) l through 4=User Defined Labor Gtegories. OTHER SYI,lBOLs AND ABEREVIATIONS: Adj.=46.1u."n,. Algn.=Align. ALu=Aluminum. Iy'M=Aftermarket part. Blnd=Blend. BOR=Boron steel. CAPA=Certified Automotive Parts Association. D&R=Disconnect and Reconnect. HSS=High Strength steel. HYD=Hydroformed Steel. Incl.=Included. U<Q=Like Kind and Qualiry. LT=1eft. MAc=Magnesium. Non-Adj.=Non Adiacent. NSF=NSF International Certified Part. O/H=Overhaul. Qty=Quantity. Refn=Refinish. Repl=Replace. R&I=Remove and Install. R&R=Remove and Replace. Rpr=Repair. RT=Right. SAS=Sandwiched Steel. Sect=Section. Subl=sublet. tlHs=Ultra Hiqh Strenqth Steel. N=Note(s) associated with the estimate line. CCC ONE Estimating - A product of CCC Information Services lnc. The following is a list of abbreviations that may be used in CCC ONE Estimating that are not part of the MOTOR CRASH ESTIMATING GUIDE: BAR=Bureau of Automotive Repair. EPA=Environmental Protection Agency. NHTSA= National Highway Transportation and Safety Administration. PDR=Paintless Dent Repair. VIN=Vehicle Idenuflcation Number. 6/9/2020 li55:a9 PIa 311359 Page 4 Photographs 1n ,l I ! t- - t 't I E I t E I .t t l I re=--4rc:---- L. I I \{ \1 \ I 7 I I 't q I \j I .4,e i I E- a I I 7 ) I q I I ar I I tIf I I I I , I , ; I { ]f -? N It ) :\, F..! G I!E .tI I ; +l E - I t I trt I Iii{ \ I T t t !l 7\ ',j ::-;..g = rEEr tu lEi.a I I I *t: i,.t I I / 't il '/ tr I lil ,'f ln 0r E ul IIl ot[ 0 '! q,rI son l\,i EIoIo 3mo'lr5o 8i Et6 I.i) b s .1B oloo3 T 6.Io. ! tn t4 g o E lP B ($ v o rc A II -- ,t.. 1$H To'4 (lt o :o N t-.t- ooa(-) --1m() TI rJ (.) s t.)$ :Q I Tm I o s <t,o $n(t o v g't frsag'riEIQ6'- o6g(! E2l,) d ta alt G3q f a E at) 0 mIm I J ta- II itn tlr E UI FI E l0 I[ t l I ., \EI Vt E F L i I bi , a { tn tlr E ul I IIltl t0 t0 I ffi s*:f\)O o0r 3 !Don t9 Pr6t,oTo 5m() 3(f, a Eg A6 6 oAi Es oE t tI OIoo,o tJ) g n s Eo $vI'.r9ag$ .o(tB; E8ood* oS ocl0eo a.o 6ro c0 3ol (\ c) r.t'1 ]U I ( J tn ^,\.t n i $ t r'f, tF it I / b<lo ln urt ul tlltt IE f[ I ;.\}o 6IIo,ooD n} F a-50o :Eo 3mo 3d xN =rp*h) (o B s, f,.lr t I $-i$o.,{lo E .,l&g Eli Eil*G IDIa -t- ol'gl EI6l tDtolnI{)to!3irD!5: siori { 1\( il m (I ilI I AG l b !) Dt) -- I {. o ln 0r E ul tllI l0 0 t b !_ 'r!NJd (o ao 'o.6)(, TI< P f-r rJoa() 5o 3(, EtPIN G) .) $ao iFf) o f' a1s o:0) o&te -ut et6o tD3ot s tD ^f 0 @ 6o 3o C\6 oo 6 c. at l I ) t l I 7 { I I I I F..--r 1/ / I t ,("@ t b .-i a')o oI(} ts (1a t.r F f$ C,oIc) 3mo 3o f;h}a{a6xtga 5 .r) $ I v <t ID5' n. rgao $ o rnrb rD TII 'lD ts.ttIo36IasE p q) n 5tttI E a ( f ox.(r,t rn!ailI \ , -':,: I \ I - I a f J, { II T / I t I A @G l I j I i i i l UI Br E rfl I Irl tT m E I b '.tit,c (o I 3o-olon lo P &ooIo g mo 3I xA) :(otl\)A <o 'D s ) 0-{B O E'.9a.r fn o {r;5 6 EH'f u i;3r!ji,^g, ? sii.,bdoato.-C}\.<O 6gtsoe$2o aEg (D 3,o) sc, <l 7/ \t rft \II J I I { f Z!G \\ I \. t_:\ ii "V fr lory lt I ,1 ,l I I !t I a I b.. I ljr.\ l' L: T7 .\ Iltt'fr 7. , I / l^ t t I N I EZ | ., .-_ t ;-4 t7.i |'I -.-\- ] .lL-)\,t I! ,/ t,'l I I .t a<' ,r_--, = \.-.... _. r- r..i'* t ) )l\ I I ) ? 5 ,*. 1 EBr I 7 .10 I mps qp mllea mlles 3 TRIPA I I I ../ I \ \I I r.! \ _1 E L.- I \E-- r-t I I a &EE 4 -_-\IE.I / l I ,- * : ,TI \I +. N E.r T t_ \-ru HI 3n .J \ \ It 1 I\ I If,, \f-.I tt \ I ll \: r.t 1 I -l r / !l I EB : E I ' '-)d t a I \\ B\* I II I I 2 .4, I-- z--/ ! \l I +/ lt ,7' = / , t a V q [' L. \' 1,/ ) / \ )t ll L I t lI 7-\ \1 I I t Tr { c I I t t t Ir\ trl { t \ t \ t .-L--I -<,, ) \1+L )t d A.I z1 t I t"l l i l -- \-rpt=* -- ,) IE D ,l I 1-' D =. I t t l. I \ s , E I ,, /4 I T =.ilE! t !I a =R{ r$, rt$ e! { { tt L \ { \ 11 /: L j ,4 'tl{ .\zI - \h--FT t, / ) I EI L ffi !t I j 71 tl II\'.{, A"l' , a,-4l?*t I, A 2 wI /I t t, T ,/ \ Il ,;l \!!!t11,,\ s I I rI (l,>..,hlr ! I N/ t \t I l'-rriJ.I / /I f1 ,), / /1, .r'_{.:'Jr'q Iv rlI/ It' --;-r.\-fl I ) ) , a.t a! tk --'.1--l-_ ILT tu W \ ',--r4 .,,/:r_ fr,t.it (lB til't rlri I tl I -], I E I J ffi,t a t\i\ \, \\\ \I! gil TI \ J dt 'lG lI \If, I rrr , \I ! '1, t \r 5 \ -t- F \,, i \ \ I ir l/v T t I t ')rt,, ET \ I ( F I t -.=\ &*, t. l. Il. I -1 t>-\ tr .J, rl I t )N ,\ t I I x L'-J I nr .} a I \ RBZOOOHK Stata Farm tlutual Automobile lnsurance Company Auto Claim File Print Financial lnformation StateFarm Route To &. BASIC CLAIM INFORMATION Clalm Numben 75-07P0-91S Dalo of Loss: 064$2020 Pollcy NumboE l{amod lrsured: SANCHEZ, LEYDI Y ' = Forced CoverageCoveragg in Force A 25150/50,D500.G500,H.R,l 25/600.u 25150,U1 Named lnsured(s) 390 - Comp-Misc Status PO - 0747-2020 lndomnlw Paid 12,861.8,1 A$islelLls CA Negotiation Attorney Rep Location T'rer: Tier Rgason: 89!@&ng.gl 0 S!b/salvaq. 10.00 Unit EXP u Assignment UnitExpress Team U (0016948232171) Covgl".oe Tvoo Primary ErDonse3 Paid 50.00 lratter: Larl Rsaetue 2.240 Nst lndemnltv s2.861.8.1 PJ ExP Shared Demand Ofllce Named lnsured(s) 501 - Rental Reimbursement sElcs PD - 06-21-2020 lndomnitv P.ld s255.84 A3sionod To CA Negotiation Attomey Rep: Location Tier: Tier Reason 8999!ro-A!!g!! 0 Subrsalvaoe s0.00 !E! EXP U Assignment UnilExpress Team U (0016948232171) coveraoe TvDo Primary Ero€ns6 Paid $0 00 atter Lalt Reservs 280 Iel lndemnitv $255.84 sg EXP Shared Oemand Offce CLAIM TOTALS lndsmnlw Paid $2.861.84 $255.84 Ded Rotund 10.00 50.00 Scllgrly3ic $0.00 $0.00 !9!!ggmnEt s2,861.E4 $25s.84 Exoense3 Paid $0.00 $0.00501 / Named S cOUParticipant 390 / Named lnsured(s) $0.00$3.1'17.68$0.00$0.00$3,117.68Totals: Proof of Payment STATE FARM CONFIOENTIAL INFORMATION Distribution on a Business Need to Know Basis Only Dale: 11-30-2020 Page 1 FINANCIAL SUMMARY AUTO Claim Numbe.: 7 ,7P0-91S RBZOOOHK PAYMENTS C denotes consolidated paymenl E denotes EFT payment P previously convened paymenl lrom CAT/CMR Pavment l{umber 123402630K E 123385547K E lssued Oate Paves 0747-2020 R,B. PAINTAND BODY 06-21-2020 HERTZ LOCAL EDITION Status Paid Paid Amount Auth IO $2,861.84 ECSAPY $255.84 ECSAPY s3,117.68Grand Total: Continued on Claim File P - File Hi lnformation re Date: 11-30-2020 STATE FARM CONFIDENTIAL INFOR[4ATION Distribution on a Business Need to Know Basis Only Page 2 City Council Agenda Item Report Agenda Item No. COV-438-2020 Submitted by: John Lau Submitting Department: Finance/Treasury Meeting Date: December 15, 2020 SUBJECT City Payroll Warrant Register Recommendation: Approve City Payroll Warrant Register No. 774, for the period of November 1 through November 30, 2020, which totals $4,014,048.08 and consists of ratification of direct deposits, checks and taxes totaling $3,061,210.91 and ratification of checks and electronic fund transfers (EFT) for payroll related disbursements totaling $952,837.17 paid through operating bank account. Background: Section 2.13 of the Vernon Municipal Code indicates the City Treasurer, or an authorized designee, shall prepare warrants covering claims or demands against the City which are to be presented to City Council for its audit and approval. Pursuant to the aforementioned code section, the City Treasurer has prepared City Payroll Account Warrant Register No. 774 covering claims and demands presented during the period of November 1 through November 30, 2020, drawn, or to be drawn, from East West Bank for City Council approval. Fiscal Impact: The fiscal impact of approving City Payroll Warrant Register No. 774, totals $4,014,048.08. The Finance Department has determined that sufficient funds to pay such claims/demands, are available in the respective accounts referenced on City Payroll Warrant Register No. 774. Attachments: 1. City Payroll Account Warrant Register No. 774 Raquel Franco | 12/7/2020 3:05 PMPAYROLL WARRANT REGISTERCity of VernonNo.774Month ofDecember 2020I hereby Certify: that claims or demands covered by the This is to certify that the claims or demandsabove listed warrants have been audited as to accuracycovered by the above listed warrants have beenand availability of funds for payments thereof; and that audited by the City Council of the City of Vernonsaid claims or demands are accurate and that funds are and that all of said warrants are approved for pay-available for payments thereof. mentsScott A. WilliamsDATEDirector of Finance/City TreasurerDATEDate:Page 1 of 1Payroll Warrant Register Memo (002) : Warrant12/08/2020 Payrolls reported for the month November: 10/11/20 - 10/24/20, Paydate 11/05/20 10/11/20 - 10/24/20, Paydate 11/05/20 10/25/20 - 11/07/20, Paydate 11/19/20 Payment Method Date Payment Description Amount CHECKS 11/05/20 Net payroll, checks 10,323.87$ ACH 11/05/20 Net payroll, direct deposits 706,923.21 ACH 11/05/20 Payroll taxes 187,616.24 ACH 11/05/20 Net payroll, direct deposits 969,437.94 ACH 11/05/20 Payroll taxes 445,129.48 CHECKS 11/19/20 Net payroll, checks 10,610.82 ACH 11/19/20 Net payroll, direct deposits 575,620.74 ACH 11/19/20 Payroll taxes 155,548.61 Total net payroll and payroll taxes 3,061,210.91 606477 11/05/20 Franchise Tax Board 242.31 10552 11/05/20 Vernon Police Officers Benefit Association 2,033.04 10553 11/05/20 IBEW Union Dues 3,169.67 10554 11/05/20 ICMA Retirement Trust 457 87,943.70 10514 11/24/20 Blue Shield of California 350,246.16 10515 11/24/20 MetLife - Group Benefits 29,387.86 10516 11/24/20 Mutual of Omaha 10,058.72 10566 11/12/20 Colonial 5,940.46 10567 11/13/20 AFLAC 11,677.04 10568 11/30/20 MES Vision 4,630.51 10557 12/03/20 CalPERS 238,303.00 10558 11/05/20 State Disbursement Unit 789.22 606553 11/19/20 Franchise Tax Board 242.31 10559 11/19/20 Vernon Police Officers Benefit Association 2,033.04 10560 11/19/20 Teamsters Local 911 2,196.00 10561 11/19/20 ICMA Retirement Trust 457 23,109.33 10564 12/07/20 CalPERS 180,724.04 10565 11/20/20 State Disbursement Unit 110.76 Payroll related disbursements, paid through Operating bank account 952,837.17 Total net payroll, taxes, and related disbursements 4,014,048.08$ Page 1 of 1 City Council Agenda Item Report Agenda Item No. COV-439-2020 Submitted by: John Lau Submitting Department: Finance/Treasury Meeting Date: December 15, 2020 SUBJECT Operating Account Warrant Register Recommendation: Approve Operating Account Warrant Register No. 58, for the period of November 15 through November 28, 2020, which totals $9,099,407.66 and consists of ratification of electronic payments totaling $8,952,303.19 and ratification of the issuance of early checks totaling $147,104.47. Background: Section 2.13 of the Vernon Municipal Code indicates the City Treasurer, or an authorized designee, shall prepare warrants covering claims or demands against the City which are to be presented to City Council for its audit and approval. Pursuant to the aforementioned code section, the City Treasurer has prepared Operating Account Warrant Register No. 58 covering claims and demands presented during the period of November 15 through November 28, 2020, drawn, or to be drawn, from East West Bank for City Council approval. Fiscal Impact: The fiscal impact of approving Operating Account Warrant Register No. 58, totals $9,099,407.66. The Finance Department has determined that sufficient funds to pay such claims/demands, are available in the respective accounts referenced on Operating Account Warrant Register No. 58. Attachments: 1. Operating Account Warrant Register No. 58 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020I hereby cerƟfy that claims and/or demands included in above listed warrantregister have been audited for accuracy and availability of funds for payments andthat said claims and/or demands are accurate and that the funds are available forpayments thereof.____________________________________________________________ScoƩ WilliamsDirector of Finance / City TreasurerDate: _______________________________________________________This is to cerƟfy that the claims or demands covered by the above listed warrantshave been audited by the City Council of the City of Vernon and that all of saidwarrants are approved for payments except Warrant Numbers:________________________________________________________________________________________________________________________Printed: 12/3/2020 11:06:33AM12/08/2020 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500150 $ ‐0.21 RecalculaƟon Charges 10/20 202011103147358677CALIFORNIA ISO002412 ‐ 055.9200.500150 $ 27.17 RecalculaƟon Charges 10/20 202011103147358677055.9200.500190 $ 21,621.45 IniƟal Charges 11/20 202011103147358743055.9200.500210 $ 9,253.86 IniƟal Charges 11/20 202011103147358743055.9200.500150 $ 979,367.18 IniƟal Charges 11/20 202011103147358743055.9200.500170 $ ‐3,211.03 IniƟal Charges 11/20 202011103147358743055.9200.500150 $ 25,234.04 RecalculaƟon Charges 10/20 202011103147358743055.9200.500170 $ 716.58 RecalculaƟon Charges 10/20 202011103147358743055.9200.500190 $ 196.36 RecalculaƟon Charges 10/20 202011103147358743055.9200.500210 $ 179.81 RecalculaƟon Charges 10/20 202011103147358743$ 1,033,385.2111/16/2020 10485011.9019.590110 $ 7,200.96 Peak Agenda Mgmt Annual SubscripƟon~ IN865234 011.0014559CARAHSOFT TECHNOLOGY CORPORATI006518 ‐ $ 7,200.9611/17/2020 10486Printed: 12/3/2020 11:06:33AMPage 1 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.596200 $ 1,250.00 OTC Commission Adjustment 1020001688088ICE US OTC COMMODITY MARKETS,004500 ‐ $ 1,250.0011/17/2020 10487055.9000.596200 $ 8,465.25 Env Compliance Support Services D3404500004JACOBS ENGINEERING GROUP, INC006886 ‐ $ 8,465.2511/17/2020 10488011.9019.860000 $ 9,120.00 Workforce Central SoŌware 11635770KRONOS INCORPORATED005034 ‐ 011.9019.860000 $ 1,560.00 Workforce Central SoŌware 11646824011.9019.590110 $ 832.19 Hardware & SoŌware Usage Fees 11670213$ 11,512.1911/17/2020 10489011.1049.590000 $ 3,582.00 Landscape Maintenance 10/20 90976MARIPOSA LANDSCAPES, INC006422 ‐ $ 3,582.0011/17/2020 10490020.1084.900000 $ 41,722.75 Technical Design Services 1783NORTHWEST ELECTRICAL SERVICES,005614 ‐ 020.1084.900000 $ 38,077.25 Technical Design Services 1783$ 79,800.0011/17/2020 10491011.1024.593200 $ 51.40 Re: Los Angeles MS4 Permit PeƟƟon 228982RICHARDS, WATSON & GERSHON003900 ‐ $ 51.4011/17/2020 10492011.1024.593200 $ 532.50 Re: Torres ArbitraƟon 880700RUTAN & TUCKER, LLP005433 ‐ $ 532.5011/17/2020 10493Printed: 12/3/2020 11:06:33AMPage 2 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1043.595200 $ 7,186.25 ADA Self EvaluaƟon & TransiƟon Plan 245726SALLY SWANSON ARCHITECTS, INC006702 ‐ $ 7,186.2511/17/2020 10494011.9019.590110 $ 1,122.50 Enterprise Vault Discovery Renewal~ 2200376703 011.0014607VERITAS TECHNOLOGIES, LLC006791 ‐ 011.9019.590110 $ 2,100.00 Enterprise Vault Email Renewal~ 2200376703 011.0014607011.9019.590110 $ 1,757.50 Enterprise Vault Archive Renewal~ 2200376703 011.0014607$ 4,980.0011/17/2020 10495011.1043.520000 $ 98.55 Paving Materials~ 72717471 011.0014469VULCAN MATERIALS CO001695 ‐ $ 98.5511/17/2020 10496011.1043.590000 $ 10,250.00 Street Sweeping Services 10/20 LB5568WEBCO LB, LLC005699 ‐ $ 10,250.0011/17/2020 10497011.1049.590000 $ 1,678.62 Air CondiƟoner Maintenance 627112WESTERN ALLIED CORPORATION006120 ‐ 011.1049.590000 $ 794.80 Air CondiƟoner Maintenance 627167$ 2,473.4211/17/2020 10498020.110010 $ 204.78 Ref. Temporary Hydrant~ 111620ZIM INDUSTRIES, INC006651 ‐ $ 204.7811/17/2020 10499Printed: 12/3/2020 11:06:33AMPage 3 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.9019.590110 $ 2,653.34 2 Collector SoŌware Maintenance & K16140020101 011.0014600ZONES, INC005784 ‐ 011.9019.590110 $ 2,532.60 DatAlert Suite SoŌware Maintenance & K16140020101 011.0014600011.9019.590110 $ 1,887.30 Data ClassificaƟon Framework for K16140020101 011.0014600011.9019.590110 $ 2,211.30 DatAdvantage for Windows SoŌware~ K16140020101 011.0014600011.9019.590110 $ 1,266.30 DatAdvantage for Directory Services K16140020101 011.0014600011.9019.520010 $ 4,120.94 SonicWall NSA 4600 PERP K16217460101 011.0014606011.9019.520010 $ 422.40 Sales Tax 10.25 K16217460101$ 15,094.1811/17/2020 10500011.1026.596200 $ 9,400.00 Medical Services 06/20 2861VITAL MEDICAL SERVICES, LLC006523 ‐ 011.1026.596200 $ 376.00 Medical Services 08/20 2941011.1026.596200 $ 6,204.00 Medical Services 07/20 2942$ 15,980.0011/17/2020 10501Printed: 12/3/2020 11:06:33AMPage 4 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.9019.520010 $ 6,235.63 Canon imageFORMULA DR‐G2140 USB~ 1954802011.0014569CDW GOVERNMENT, INC000447 ‐ 011.9019.520010 $ 592.38 Sales Tax 9.5% 1954802011.9019.520010 $ 154.00 StarTech.com Full MoƟon TV Wall Mount 2129187 011.0014558011.9019.520010 $ 800.74 APC Smart‐UPS X 120V External BaƩery 2129187 011.0014558011.9019.520010 $ 2,030.75 APC Smart‐UPS X 3000VA Rack/Tower LCD 2129187 011.0014558011.9019.520010 $ 164.92 StarTech.com USB 3.0 to Gigabit 2129187 011.0014558011.9019.520010 $ 169.65 TRENDnet TPE‐115GI Power over Ethernet 2129187 011.0014558011.9019.520010 $ 83.09 Belkin MIXIT. 2.0 USB‐A to USB‐C Charge 2129187 011.0014558011.9019.520010 $ 264.56 NETGEAR 8‐Port Gigabit Ethernet Smart 2129187 011.0014558011.9019.520010 $ 14.63 Sales Tax 9.5% 2129187011.9019.520010 $ 333.80 Sales Tax 9.5% 2129187011.9019.590110 $ 8,019.00 PFPT ESSENTIALS ADV SAAS 1~ 2159442 011.0014567$ 18,863.1511/19/2020 10502Printed: 12/3/2020 11:06:33AMPage 5 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1043.540000 $ 63.57 Uniforms 4058002491CINTAS CORPORATION005490 ‐ 011.1046.540000 $ 42.38 Uniforms 4058002491011.1047.540000 $ 42.38 Uniforms 4058002491011.1049.540000 $ 63.56 Uniforms 4058002491011.1043.540000 $ 79.48 Uniforms 4058631591011.1046.540000 $ 52.99 Uniforms 4058631591011.1047.540000 $ 52.99 Uniforms 4058631591011.1049.540000 $ 79.48 Uniforms 4058631591011.1043.540000 $ 67.09 Uniforms 4059293746011.1046.540000 $ 44.73 Uniforms 4059293746011.1047.540000 $ 44.73 Uniforms 4059293746011.1049.540000 $ 67.08 Uniforms 4059293746011.1043.540000 $ 68.35 Uniforms 4059967772011.1046.540000 $ 45.57 Uniforms 4059967772011.1047.540000 $ 45.57 Uniforms 4059967772011.1049.540000 $ 68.35 Uniforms 4059967772011.1043.540000 $ 64.50 Uniforms 4060579115011.1046.540000 $ 43.00 Uniforms 4060579115011.1047.540000 $ 43.00 Uniforms 4060579115011.1049.540000 $ 64.51 Uniforms 4060579115011.1043.540000 $ 64.81 Uniforms 4061158521011.1046.540000 $ 43.21 Uniforms 4061158521011.1047.540000 $ 43.21 Uniforms 4061158521Printed: 12/3/2020 11:06:33AMPage 6 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1049.540000 $ 64.80 Uniforms 4061158521CINTAS CORPORATION005490 ‐ 011.1043.540000 $ 64.50 Uniforms 4061891309011.1046.540000 $ 43.00 Uniforms 4061891309011.1047.540000 $ 43.00 Uniforms 4061891309011.1049.540000 $ 64.51 Uniforms 4061891309011.1043.540000 $ 64.50 Uniforms 4062467809011.1046.540000 $ 43.00 Uniforms 4062467809011.1047.540000 $ 43.00 Uniforms 4062467809011.1049.540000 $ 64.51 Uniforms 4062467809011.1043.540000 $ 64.50 Uniforms 4063127600011.1046.540000 $ 43.00 Uniforms 4063127600011.1047.540000 $ 43.00 Uniforms 4063127600011.1049.540000 $ 64.51 Uniforms 4063127600011.1043.540000 $ 68.74 Uniforms 4063846550011.1046.540000 $ 45.83 Uniforms 4063846550011.1047.540000 $ 45.83 Uniforms 4063846550011.1049.540000 $ 68.73 Uniforms 4063846550011.1046.540000 $ 43.00 Uniforms 4064507193011.1047.540000 $ 43.00 Uniforms 4064507193011.1049.540000 $ 64.50 Uniforms 4064507193011.1043.540000 $ 64.50 Uniforms 4064507193011.1043.540000 $ 64.50 Uniforms 4065139343011.1046.540000 $ 43.00 Uniforms 4065139343Printed: 12/3/2020 11:06:33AMPage 7 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1047.540000 $ 43.00 Uniforms 4065139343CINTAS CORPORATION005490 ‐ 011.1049.540000 $ 64.50 Uniforms 4065139343011.1043.540000 $ 64.50 Uniforms 4065818612011.1046.540000 $ 43.00 Uniforms 4065818612011.1047.540000 $ 43.00 Uniforms 4065818612011.1049.540000 $ 64.50 Uniforms 4065818612$ 2,878.5011/19/2020 10503011.1021.797000 $ 8,100.00 Professional Services~ SEP20JEMMOTT ROLLINS GROUP, INC005108 ‐ $ 8,100.0011/19/2020 10504020.1084.840000 $ 27,443.68 New/Unused 2020 Ford Escape (U0B)~ WF554 011.0014300NATIONAL AUTO FLEET GROUP005632 ‐ 020.1084.840000 $ 8.75 Tire Fee WF554 011.0014300020.1084.840000 $ 2,607.15 Sales Tax 9.5% WF554$ 30,059.5811/19/2020 10505056.5600.595200 $ 826.99 Clean, Test, & Recalibrate EZ Fuse 140234INP&F DISTRIBUTORS003332 ‐ 056.5600.596700 $ 1,500.00 Fusion CerƟficaƟon 140235IN056.5600.595200 $ 12.40 Finance Charge NOV0306FC056.5600.596700 $ 22.50 Finance Charge NOV0306FC056.5600.595200 $ 12.40 Finance Charge OCT0268FC056.5600.596700 $ 22.50 Finance Charge OCT0268FC$ 2,396.7911/19/2020 10506Printed: 12/3/2020 11:06:33AMPage 8 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9000.596200 $ 15,000.00 ConsultaƟon & Support Services VERNPVHPORT CANAVERAL PWR CONSULTANTS002459 ‐ $ 15,000.0011/20/2020 10507055.9200.500180 $ 1,000.00 Capacity Charges 10/20 111020ARIZONA ELECTRIC POWER COOPERA006877 ‐ $ 1,000.0011/20/2020 10508055.9200.500180 $ 55,800.00 Capacity Charges 10/20 257369CITY OF RIVERSIDE002581 ‐ $ 55,800.0011/20/2020 10509055.9200.500180 $ 12,750.00 North System 150PIONEER COMMUNITY ENERGY006802 ‐ $ 12,750.0011/20/2020 10510055.9200.500150 $ 373,470.43 Monthly Energy Related Payment 10202001BICENT (CALIFORNIA) MALBURG, L003336 ‐ 055.9200.500180 $ 3,657,717.61 Monthly Capacity Payment 10202001055.9200.500150 $ ‐406.77 Fuel Burden 10202001055.9200.500150 $ ‐104,683.00 HR Bonus Overpayment 10202001$ 3,926,098.2711/23/2020 10511Printed: 12/3/2020 11:06:33AMPage 9 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500150 $ 40,438.89 RecalculaƟon Charges 10/20 202011173147440880CALIFORNIA ISO002412 ‐ 055.9200.500170 $ 47,115.61 RecalculaƟon Charges 10/20 202011173147440880055.9200.500180 $ 189.95 RecalculaƟon Charges 10/20 202011173147440880055.9200.500190 $ 1,868.79 RecalculaƟon Charges 10/20 202011173147440880055.9200.500210 $ 262.70 RecalculaƟon Charges 10/20 202011173147440880055.9200.500240 $ 275.78 RecalculaƟon Charges 10/20 202011173147440880055.9200.500150 $ ‐113,026.94 RecalculaƟon Charges 08/20 202011173147440880055.9200.500170 $ ‐1,845.74 RecalculaƟon Charges 08/20 202011173147440880055.9200.500180 $ ‐108.80 RecalculaƟon Charges 08/20 202011173147440880055.9200.500190 $ ‐8,654.44 RecalculaƟon Charges 08/20 202011173147440880055.9200.500210 $ ‐7.05 RecalculaƟon Charges 08/20 202011173147440880055.9200.500150 $ 292,516.66 IniƟal Charges 11/20 202011173147440880055.9200.500210 $ 14,046.24 IniƟal Charges 11/20 202011173147440880055.9200.500170 $ ‐7,137.63 IniƟal Charges 11/20 202011173147440880Printed: 12/3/2020 11:06:33AMPage 10 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500190 $ ‐6,148.43 IniƟal Charges 11/20 202011173147440880CALIFORNIA ISO002412 ‐ 055.9200.500150 $ 2,116.80 RecalculaƟon Charges 11/20 202011173147440880055.9200.500170 $ 183.05 RecalculaƟon Charges 11/20 202011173147440880055.9200.500190 $ ‐61.05 RecalculaƟon Charges 11/20 202011173147440880055.9200.500210 $ ‐13.04 RecalculaƟon Charges 11/20 202011173147440880$ 262,011.3511/23/2020 10512011.1026.502031 $ 13,759.27 Medical ReƟrees~ 166623983ANTHEM BLUE CROSS005182 ‐ $ 13,759.2711/24/2020 10513055.9200.500160 $ 20,077.00 Biomethane RPS102020BIOFUEL GENERATION SERVICES, L005067 ‐ $ 20,077.0011/24/2020 10517055.9200.500160 $ 69,600.00 Natural Gas 10/20 66373CALPINE ENERGY SERVICES, LP002060 ‐ $ 69,600.0011/24/2020 10518055.9200.500160 $ 37,965.00 Natural Gas 10/20 1020107280CIMA ENERGY, LP006298 ‐ $ 37,965.0011/24/2020 10519055.9200.500160 $ 11,100.00 Natural Gas 10/20 147789CONOCOPHILLIPS COMPANY005388 ‐ $ 11,100.0011/24/2020 10520Printed: 12/3/2020 11:06:33AMPage 11 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.9200.500160 $ 151,977.50 Natural Gas 10/20 1106416EDF TRADING NORTH AMERICA, LLC004116 ‐ $ 151,977.5011/24/2020 10521055.9200.500162 $ 49,330.09 Biomethane Gas 10/20 RC4019ELEMENT MARKETS RENEWABLE NATU004665 ‐ 055.9200.500162 $ 71,624.02 Biomethane Gas 10/20 RC4020$ 120,954.1111/24/2020 10522055.9200.500160 $ 783,365.00 Natural Gas 10/20 GASI00146963MACQUARIE ENERGY, LLC006086 ‐ $ 783,365.0011/24/2020 10523055.9200.500160 $ 37,800.00 Natural Gas 10/20 230180PACIFIC SUMMIT ENERGY, LLC005908 ‐ $ 37,800.0011/24/2020 10524011.1048.590000 $ 4,975.00 Re‐joint, Sand and Paint Interior of 249ELEMENT PAINTING & DECOR006857 ‐ $ 4,975.0011/24/2020 10525011.9019.520010 $ 690.00 2MP HDCVI MOTOTRIZED BULLET CAMERA 2.719782177 011.0014591ETC DEPOT005460 ‐ 011.9019.520010 $ 500.00 8CH HDCVI/AHD/TVI/CVBS/IP~ 19782177 011.0014591011.9019.520010 $ 110.00 DC12V, 10amp, 9ch Power Supply 19782177 011.0014591011.9019.520010 $ 10.00 MALE PIGTAIL 19782177 011.0014591011.9019.520010 $ 40.00 Freight 19782177 011.0014591011.9019.520010 $ 124.45 Sales Tax 9.5% 19782177$ 1,474.4511/24/2020 10526Printed: 12/3/2020 11:06:33AMPage 12 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE020.1084.900000 $ 278,590.00 Well & Booster Pump Maintenance 28267GENERAL PUMP COMPANY, INC000147 ‐ $ 278,590.0011/24/2020 10527011.9019.590110 $ 2,900.00 1‐year Capture Advanced Threat 70464807 011.0014568GOVCONNECTION, INC001729 ‐ $ 2,900.0011/24/2020 10528055.8400.590000 $ 672.50 Quarterly InspecƟon 12/20 154387048KONECRANES, INC002169 ‐ $ 672.5011/24/2020 10529011.1049.590000 $ 2,392.00 Turf RenovaƟon 91042MARIPOSA LANDSCAPES, INC006422 ‐ 011.1049.590000 $ 677.00 IrrigaƟon Repairs 91175$ 3,069.0011/24/2020 10530011.1004.520000 $ 198.86 Postage 776343NDS006687 ‐ $ 198.8611/24/2020 10531055.9200.596200 $ 841.76 Electronic Tagging~ 159417 055.0002815OPEN ACCESS TECHNOLOGY INTL, I000629 ‐ $ 841.7611/24/2020 10532056.5600.590000 $ 193.47 Finance Charge MAY0075FCP&F DISTRIBUTORS003332 ‐ 056.5600.520000 $ 132.62 Finance Charge MAY0527056.5600.520000 $ 4.86 Finance Charge SEP0705FC$ 330.9511/24/2020 10533Printed: 12/3/2020 11:06:33AMPage 13 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE020.1084.900000 $ 19,515.00 Design Services 4413PACIFIC ADVANCED CIVIL ENGINEE006787 ‐ $ 19,515.0011/24/2020 10534055.9200.596200 $ 6,393.75 SoŌware Services Fee 12/20 VERN61POWER SETTLEMENTS CONSULTING &005658 ‐ $ 6,393.7511/24/2020 10535055.9000.596200 $ 2,419.20 ResoluƟon Billing 1120REVISEDSO CAL PUBLIC POWER AUTHORITY002517 ‐ 055.9200.596200 $ 8,051.84 ResoluƟon Billing 1120REVISED$ 10,471.0411/24/2020 10536011.1043.590000 $ 8,803.76 Traffic Signal Maintenance 5620031869SIEMENS MOBILITY, INC001079 ‐ 011.1043.590000 $ 1,246.50 Traffic Signal Maintenance 5620032256$ 10,050.2611/24/2020 10537055.9200.500170 $ 24,669.00 Laguna Bell 11/20 7501201262SO CAL EDISON000059 ‐ 055.9200.500170 $ 53,460.00 Victorville Lugo Vernon 11/20 7501201297055.9200.500170 $ 126,360.00 Mead Laguna Bell 11/20 7501201298$ 204,489.0011/24/2020 10538055.9200.500150 $ 15,473.79 Boulder Canyon Project Charges 10/20 GG1766W1020US DEPARTMENT OF ENERGY002227 ‐ 055.9200.500180 $ 29,212.33 Boulder Canyon Project Charges 10/20 GG1766W1020$ 44,686.1211/24/2020 10539Printed: 12/3/2020 11:06:33AMPage 14 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE020.1084.520000 $ 254.75 Paving Materials~ 72734708 011.0014444VULCAN MATERIALS CO001695 ‐ 020.1084.520000 $ 533.72 Paving Materials~ 72741978 011.0014444020.1084.520000 $ 246.08 Paving Materials~ 72744101 011.0014444020.1084.520000 $ 83.81 Paving Materials~ 72749171 011.0014444$ 1,118.3611/24/2020 10540020.272010 $ 34,883.72 Quarterly Payment No. 2~ 202002WATER REPLENISHMENT DISTRICT001658 ‐ $ 34,883.7211/24/2020 10541055.9000.900000 $ 1,180.00 Iridium 59569WIRELESS INNOVATION LIMITED004442 ‐ 055.9000.900000 $ 1,203.60 Iridium 60020055.9000.900000 $ 47.68 Iridium 60456$ 2,431.2811/24/2020 10542055.9200.500160 $ 57,000.00 Natural Gas 10/20 202010GS006THE GAS COMPANY001581 ‐ $ 57,000.0011/24/2020 10543055.9200.500170 $ 21,870.00 Electric Energy TransacƟons GA197707DEPARTMENT OF WATER & POWER002468 ‐ 055.9200.550022 $ 575.00 Electric Energy TransacƟons GA197707$ 22,445.0011/24/2020 10544055.9200.500160 $ 673,132.84 Natural Gas 10/20 3295277MERCURIA ENERGY AMERICA, LLC006262 ‐ $ 673,132.8411/24/2020 10545Printed: 12/3/2020 11:06:33AMPage 15 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.9019.590110 $ 16,799.34 Trend Micro Appliance Renewal~ IN000651637 011.0014490SOUTHERN COMPUTER WAREHOUSE, I006711 ‐ $ 16,799.3411/25/2020 10546011.1033.502020 $ 4.29 RBF: B. English 100000016195780CALPERS000714 ‐ $4.2911/17/2020 10547Printed: 12/3/2020 11:06:33AMPage 16 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1001.502020 $ 1,407.01 Monthly Expense of UAL~ 100000016223316CALPERS000714 ‐ 011.1002.502020 $ 9,185.37 Monthly Expense of UAL~ 100000016223316011.1003.502020 $ 5,282.91 Monthly Expense of UAL~ 100000016223316011.1004.502020 $ 19,485.72 Monthly Expense of UAL~ 100000016223316011.1024.502020 $ 4,672.32 Monthly Expense of UAL~ 100000016223316011.1026.502020 $ 9,557.03 Monthly Expense of UAL~ 100000016223316011.1031.502020 $ 16,485.87 Monthly Expense of UAL~ 100000016223316011.1033.502020 $ 3,743.17 Monthly Expense of UAL~ 100000016223316011.1040.502020 $ 6,636.83 Monthly Expense of UAL~ 100000016223316011.1041.502020 $ 8,787.16 Monthly Expense of UAL~ 100000016223316011.1043.502020 $ 27,025.15 Monthly Expense of UAL~ 100000016223316011.1046.502020 $ 5,123.63 Monthly Expense of UAL~ 100000016223316011.1047.502020 $ 4,884.70 Monthly Expense of UAL~ 100000016223316011.1048.502020 $ 2,468.90 Monthly Expense of UAL~ 100000016223316011.1049.502020 $ 5,309.46 Monthly Expense of UAL~ 100000016223316057.1057.502020 $ 1,035.34 Monthly Expense of UAL~ 100000016223316011.1060.502020 $ 11,415.34 Monthly Expense of UAL~ 100000016223316020.1084.502020 $ 21,954.62 Monthly Expense of UAL~ 100000016223316056.5600.502020 $ 9,875.60 Monthly Expense of UAL~ 100000016223316055.7100.502020 $ 5,070.53 Monthly Expense of UAL~ 100000016223316055.7200.502020 $ 584.04 Monthly Expense of UAL~ 100000016223316055.8000.502020 $ 8,972.99 Monthly Expense of UAL~ 100000016223316055.8100.502020 $ 23,096.15 Monthly Expense of UAL~ 100000016223316Printed: 12/3/2020 11:06:33AMPage 17 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE055.8400.502020 $ 929.16 Monthly Expense of UAL~ 100000016223316CALPERS000714 ‐ 055.9000.502020 $ 18,344.17 Monthly Expense of UAL~ 100000016223316011.9019.502020 $ 9,079.18 Monthly Expense of UAL~ 100000016223316055.9100.502020 $ 16,220.40 Monthly Expense of UAL~ 100000016223316055.9200.502020 $ 8,840.25 Monthly Expense of UAL~ 100000016223316011.1031.502020 $ 188,509.00 Monthly Expense of UAL~ 100000016223322011.1033.502020 $ 770.00 Monthly Expense of UAL~ 100000016223325011.1031.502020 $ 296.00 Monthly Expense of UAL~ 100000016223329011.1033.502020 $ 300,854.00 Monthly Expense of UAL~ 100000016223334011.1024.502020 $ 54.00 Monthly Expense of UAL~ 100000016223339$ 755,956.0011/25/2020 10548056.5600.520000 $ 549.39 Building Supplies ~ 091620_MULTIPLE 056.0000617HOME DEPOT CREDIT SERVICES001552 ‐ 055.9100.520000 $ 334.31 Hardware Supplies~ 092820_MULTIPLE 055.0002812055.8000.590000 $ 2,162.10 Small Tools, Plumbing & Hardware 092920_MULTIPLE 055.0002809055.8400.590000 $ 302.27 Small Tools, Plumbing & Hardware 092920_MULTIPLE 055.0002809011.1043.520000 $ 908.93 Small Tools & Plumbing Hardware~ 102920_MULTIPLE 011.0014456011.1048.520000 $ 5,570.96 Small Tools & Plumbing Hardware~ 102920_MULTIPLE 011.0014456011.1049.520000 $ 3,961.39 Small Tools & Plumbing Hardware~ 102920_MULTIPLE 011.0014456020.1084.520000 $ 128.88 Building Materials & Hardware~ 8360758 011.0014441$ 13,918.2311/25/2020 10549Printed: 12/3/2020 11:06:33AMPage 18 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020ELECTRONICVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTPAYMENTNUMBERPAYMENTDATE011.1048.560000 $ 31.17 Period: 10/07/20 ‐ 11/06/20 111020THE GAS COMPANY001581 ‐ 011.1049.560000 $ 662.58 Period: 10/08/20 ‐ 11/09/20 111220011.1043.560000 $ 331.29 Period: 10/08/20 ‐ 11/09/20 111220020.1084.560000 $ 331.29 Period: 10/08/20 ‐ 11/09/20 111220011.1049.560000 $ 780.06 Period: 10/08/20 ‐ 11/09/20 111220(2)$ 2,136.3911/25/2020 10550011.1033.520000 $ 18.24 Period: 10/20 933312420(2)UPS001617 ‐ 011.1041.520000 $ 31.00 Period: 10/20 933312420(2)011.1033.520000 $ 18.06 Period: 10/20 933312430(2)055.8000.590000 $ 15.98 Period: 10/20 933312430(2)011.1041.520000 $ 46.06 Period: 10/20 933312430(2)011.1041.520000 $ 88.50 Period: 10/20 933312440(2)$ 217.8411/27/2020 10551TOTAL ELECTRONIC$ 8,952,303.19Printed: 12/3/2020 11:06:33AMPage 19 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1043.520000 $ 640.00 85 Gallon Steel Opentop Drum 57511 011.0014560AMBERWICK CORP005204 ‐ 011.1043.520000 $ 78.00 15 Gallon Steel Opentop Drum 57511 011.0014560011.1043.520000 $ 54.00 55 Gallon Steel Opentop Drum 57511 011.0014560011.1043.520000 $ 79.00 1.0 Cubic Yard Box 57511 011.0014560011.1043.520000 $ 159.00 Freight 57511 011.0014560011.1043.520000 $ 80.85 Sales Tax 9.5% 57511$ 1,090.8511/17/2020 606511011.9019.590110 $ 700.00 Fire StaƟon InspecƟon Database System 18020ANGEL CITY DATA, INC000314 ‐ $ 700.0011/17/2020 606512055.9200.560010 $ 308.60 Period: 09/19/20 ‐ 10/18/20 3121379947AT&T001948 ‐ $ 308.6011/17/2020 606513011.9019.560010 $ 46.23 Period: 09/09/20 ‐ 10/08/20 832176480X10162020AT&T MOBILITY002889 ‐ $ 46.2311/17/2020 606514011.9019.520010 $ 3,405.45 Door Maintenance 5095550BEARCOM006054 ‐ $ 3,405.4511/17/2020 606515011.1026.596200 $ 11,776.66 ArbitraƟon Costs~ 111220STEPHEN M. BIERSMITH006624 ‐ $ 11,776.6611/17/2020 606516011.1043.560000 $ 44.81 Period: 09/22/20 ‐ 10/21/20 102220CALIFORNIA WATER SERVICE CO000778 ‐ $ 44.8111/17/2020 606517Printed: 12/3/2020 11:06:33AMPage 20 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.520000 $ 1,161.50 Concrete 94813551CALPORTLAND COMPANY000256 ‐ $ 1,161.5011/17/2020 606518011.1048.596200 $ 71.05 Background Check 135429CLEAR INVESTIGATIVE ADVANTAGE,004787 ‐ $ 71.0511/17/2020 606519011.1026.596200 $ 8,793.56 Court Reporter Costs~ 111220COALITION COURT REPORTERS006952 ‐ $ 8,793.5611/17/2020 606520011.1049.520000 $ 1,702.38 Overhead Doors Maintenance 19099COMMERCIAL DOOR OF LOS ANGELES000331 ‐ $ 1,702.3811/17/2020 606521011.1049.520000 $ 196.20 Electrical Supplies & Hardware~ 264974 011.0014462CURRENT WHOLESALE ELECTRIC SUP001336 ‐ 011.1049.520000 $ 281.12 Electrical Supplies & Hardware~ 264976 011.0014462011.1049.520000 $ 43.00 Electrical Supplies & Hardware~ 264977 011.0014462011.1049.520000 $ 11.51 Electrical Supplies & Hardware~ 264978 011.0014462011.1049.520000 $ 893.03 Electrical Supplies & Hardware~ 265153 011.0014462011.1048.520000 $ 74.40 Electrical Supplies & Hardware~ 265154 011.0014462011.1043.520000 $ 253.58 Electrical Supplies & Hardware~ 265155 011.0014462011.1043.520000 $ 23.75 Electrical Supplies & Hardware~ 265156 011.0014462$ 1,776.5911/17/2020 606522Printed: 12/3/2020 11:06:33AMPage 21 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.900000 $ 12,575.00 EATON SPX250A0‐4A2N1~ 6530002 011.0014556ELECTRICAL SALES, INC006918 ‐ 020.1084.900000 $ 12,575.00 EATON SPX250A0‐4A2N1~ 6530002 011.0014556020.1084.900000 $ 495.00 EATON OPTCQ~ 6530002 011.0014556020.1084.900000 $ 495.00 EATON OPTCQ~ 6530002 011.0014556020.1084.900000 $ 209.69 Freight 6530002020.1084.900000 $ 209.69 Freight 6530002020.1084.900000 $ 1,261.57 Sales Tax 9.5% 6530002020.1084.900000 $ 1,261.57 Sales Tax 9.5% 6530002$ 29,082.5211/17/2020 606523Printed: 12/3/2020 11:06:33AMPage 22 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.120010 $ 856.00 Toilet Paper~ S4214044001 011.0014500EMPIRE CLEANING SUPPLY001936 ‐ 011.120010 $ 1,308.00 GP White MulƟfold Towel~ S4214044001 011.0014500011.120010 $ 68.64 Bleach Germicidal~ S4214044001 011.0014500011.120010 $ 80.40 Glass Cleaner~ S4214044001 011.0014500011.120010 $ 121.00 Disinfectant Spray~ S4214044001 011.0014500011.120010 $ 39.60 Urinal Screens~ S4214044001 011.0014500011.120010 $ 234.99 Sales Tax 9.5% S4214044001011.120010 $ 447.36 Hand Soap~ S4214044002 011.0014500011.120010 $ 42.50 Sales Tax 9.5% S4214044002011.120010 $ 65.76 Mango Eco Clip~ S4214044003 011.0014500011.120010 $ 6.25 Sales Tax 9.5% S4214044003011.120010 $ 11.00 Disinfectant Spray~ S4214044004 011.0014500011.120010 $ 1.05 Sales Tax 9.5% S4214044004$ 3,282.5511/17/2020 606524011.120010 $ 1,483.28 10" Gate Valve~ 735414 011.0014589FERGUSON WATERWORKS000524 ‐ 011.120010 $ 1,866.72 8" Gate Valve~ 735414 011.0014589011.120010 $ 318.25 Sales Tax 9.5% 735414$ 3,668.2511/17/2020 606525011.1070.550000 $ 350.00 General All Around Event Coverage~ 28 011.0014579BRIAN FIGUEROA005980 ‐ $ 350.0011/17/2020 606526Printed: 12/3/2020 11:06:33AMPage 23 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE055.8400.596200 $ 142.00 Disposal & Recycling Services 09X00250HAUL AWAY RUBBISH SERVICE CO,005350 ‐ 055.8400.596200 $ 780.60 Disposal & Recycling Services 09X00251$ 922.6011/17/2020 606527011.9019.590110 $ 64.00 SBF Abstract 21ASRE070LA COUNTY ASSESSOR OFFICE001792 ‐ $ 64.0011/17/2020 606528011.1049.590000 $ 210.00 Pool Maintenance 6195LA POOL GUYS005340 ‐ $ 210.0011/17/2020 606529011.1031.596500 $ 54.58 DUI Checkpoint ‐ Planning & Mgmt 102820RAFAEL LANDA003701 ‐ $ 54.5811/17/2020 606530011.9019.520010 $ 215.00 Time Tracking System 52366ONEPOINT HUMAN CAPITAL MGMT006475 ‐ $ 215.0011/17/2020 606531011.1031.596500 $ 54.58 DUI Checkpoint ‐ Planning & Mgmt 102820DANIEL ONOPA003248 ‐ $ 54.5811/17/2020 606532056.5600.900000 $ 3,264.00 3M175 Meter~ 102999 056.0000627PFT‐ALEXANDER, INC005762 ‐ 056.5600.900000 $ 334.56 Sales Tax 10.25 102999$ 3,598.5611/17/2020 606533011.1049.520000 $ 58.64 Plumbing Supplies & Building Hardware S1236733001PLUMBING & INDUSTRIAL SUPPLY001943 ‐ $ 58.6411/17/2020 606534Printed: 12/3/2020 11:06:33AMPage 24 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE055.8400.596200 $ 718.90 Janitorial Services 10/20~ 71910PRIORITY BUILDING SERVICES, LL006416 ‐ 055.8300.596200 $ 595.63 Janitorial Services 10/20~ 71910056.5600.596200 $ 821.45 Janitorial Services 10/20~ 71910$ 2,135.9811/17/2020 606535011.1046.590000 $ 692.00 Car Wash Services 275924QUALIFIED MOBILE, INC006612 ‐ $ 692.0011/17/2020 606536055.9000.900000 $ 322.50 Meteorological Services 2009SIMON WIND, INC005790 ‐ 055.9000.900000 $ 1,000.00 Meteorological Services 2010$ 1,322.5011/17/2020 606537011.1031.520000 $ 16.20 Laundry Services~ 11957 011.0014447STATE STREET LAUNDRY000191 ‐ 011.1031.520000 $ 7.20 Laundry Services~ 11960 011.0014447011.1031.520000 $ 8.10 Laundry Services~ 11961 011.0014447$ 31.5011/17/2020 606538011.1049.590000 $ 2,090.95 Remove & Replace ATS Mechanism & 20580SWEINHART ELECTRIC CO005556 ‐ 011.1049.590000 $ 294.52 Minor Service on EPS 21386$ 2,385.4711/17/2020 606539Printed: 12/3/2020 11:06:33AMPage 25 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1046.520000 $ 810.00 245/55R18 Good Year Eagle RSA 17052522 011.0014613TIREHUB, LLC006371 ‐ 011.1046.520000 $ 387.00 265/60R17 Good Year Eagle RSA 17052522 011.0014613011.1046.590000 $ 15.75 CA Tire Fee 17052522 011.0014613011.1046.520000 $ 113.73 Sales Tax 9.5% 17052522$ 1,326.4811/17/2020 606540011.9019.560010 $ 836.16 Period: 09/11/20 ‐ 10/10/20 9864608138VERIZON WIRELESS001481 ‐ $ 836.1611/17/2020 606541020.1084.500140 $ 330.00 Water Quality TesƟng & ReporƟng W0J1961COVERNONWECK LABORATORIES, INC001628 ‐ $ 330.0011/17/2020 606542011.1043.520000 $ 343.94 Regulatory Signs & MounƟng Hardware~ 90130011.0014470ZUMAR INDUSTRIES, INC001153 ‐ 011.1043.520000 $ 1,570.98 Regulatory Signs & MounƟng Hardware~ 90213 011.0014470$ 1,914.9211/17/2020 606543Printed: 12/3/2020 11:06:33AMPage 26 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE055.8100.596200 $ 84.95 Portable Restrooms 646982A THRONE CO, INC000005 ‐ 055.8100.596200 $ 88.95 Portable Restrooms 646984055.8100.596200 $ 216.49 Portable Restrooms 651514055.8100.596200 $ 122.43 Portable Restrooms 656154055.8100.596200 $ 122.43 Portable Restrooms 656156055.8100.596200 $ 122.43 Portable Restrooms 660858055.8100.596200 $ 279.14 Portable Restrooms 660859055.8100.596200 $ 122.43 Portable Restrooms 660860020.1084.520000 $ 84.95 Portable Restrooms 662686055.8100.596200 $ 122.43 Portable Restrooms 665379055.8100.596200 $ 279.14 Portable Restrooms 665380055.8100.596200 $ 122.43 Portable Restrooms 665381020.1084.520000 $ 84.95 Portable Restrooms 667344$ 1,853.1511/24/2020 606544011.1049.520000 $ 855.12 Office Grade Surge Strip~ 3117 011.0014605AMERICAN SAFETY PRODUCTS006934 ‐ 011.1049.520000 $ 87.65 Sales Tax 10.25 3117$ 942.7711/24/2020 606545011.1046.520000 $ 105.00 Reflash Computer 33831 011.0014612ANAYA SERVICE CENTER006308 ‐ $ 105.0011/24/2020 606546011.1031.594200 $ 2,960.38 Inmate Housing 10/20 19721CITY OF HUNTINGTON PARK003846 ‐ $ 2,960.3811/24/2020 606547Printed: 12/3/2020 11:06:33AMPage 27 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.500140 $ 719.00 Water Quality TesƟng & ReporƟng 977361CLINICAL LAB OF SAN BERNARDINO003088 ‐ $ 719.0011/24/2020 606548011.1049.520000 $ 4,079.92 Overhead Doors Maintenance 19103COMMERCIAL DOOR OF LOS ANGELES000331 ‐ $ 4,079.9211/24/2020 606549011.1048.590000 $ 60.00 Pest Control Services 13858103DEWEY PEST CONTROL002566 ‐ 011.1048.590000 $ 100.00 Pest Control Services 13858108011.1048.590000 $ 95.00 Pest Control Services 13858109011.1048.590000 $ 135.00 Pest Control Services 13858110011.1048.590000 $ 75.00 Pest Control Services 13858111011.1049.590000 $ 62.00 Pest Control Services 13858112011.1049.590000 $ 67.00 Pest Control Services 13858113011.1049.590000 $ 42.00 Pest Control Services 13858114$ 636.0011/24/2020 606550011.1026.596200 $ 52.00 Reimb. Live Scan 111220THO DO006954 ‐ $ 52.0011/24/2020 606551Printed: 12/3/2020 11:06:33AMPage 28 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1049.520000 $ 462.72 Respirator N95~ 96055 011.0014400EXTREME SAFETY, INC004730 ‐ 011.1049.520000 $ 43.96 Sales Tax 9.5% 96055011.120010 $ 367.50 N‐DEX 8‐mil Blue Nitrile~ 98500 011.0014350011.120010 $ 300.00 N‐DEX 8‐mil Blue Nitrile ~ 98500 011.0014350011.120010 $ 712.80 Nitrile Palm Gloves Large~ 98500 011.0014350011.120010 $ 131.13 Sales Tax 9.5% 98500$ 2,018.1111/24/2020 606552011.1048.596200 $ 67.50 Disposal & Recycling Services 0AX00260HAUL AWAY RUBBISH SERVICE CO,005350 ‐ 011.1049.596200 $ 213.00 Disposal & Recycling Services 0AX00261011.1033.520000 $ 135.00 Disposal & Recycling Services 0AX00262011.1033.520000 $ 135.00 Disposal & Recycling Services 0AX00263011.1033.520000 $ 135.00 Disposal & Recycling Services 0AX00264011.1033.520000 $ 67.50 Disposal & Recycling Services 0AX00265055.8400.596200 $ 142.00 Disposal & Recycling Services 0AX00266055.8400.596200 $ 610.95 Disposal & Recycling Services 0AX00267011.1043.596200 $ 1,010.20 Disposal & Recycling Services 0AX00268$ 2,516.1511/24/2020 606554011.1046.520000 $ 175.00 DifferenƟal Pressure Switch 1246 011.0014616HP DPF CLEANING006740 ‐ 011.1046.590000 $ 1,150.00 Labor to remove & install DPF Filter 1246 011.0014616011.1046.520000 $ 17.94 Sales Tax 10.25 1246$ 1,342.9411/24/2020 606555Printed: 12/3/2020 11:06:33AMPage 29 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1026.594200 $ 75.00 ParƟcipaƟon Fee 225914IGOE & COMPANY, INC000686 ‐ $ 75.0011/24/2020 606556011.1046.520000 $ 273.87 Oil Coolant, O‐Rings, Oil Filter, & Oil 2650 011.0014615IMPACT TIRE AUTO & TRUCK REPAI005560 ‐ 011.1046.590000 $ 325.00 Labor to replace oil cooler & clean 2650 011.0014615011.1046.520000 $ 28.07 Sales Tax 10.25 2650$ 626.9411/24/2020 606557Printed: 12/3/2020 11:06:33AMPage 30 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.900000 $ 455.40 WE01‐DTD01‐D W.E. Anderson WE01 Ball IN576198 011.0014549INSTRUMART006075 ‐ 020.1084.900000 $ 447.95 B110‐750‐1/2 BlanceƩ 1100 Turbine IN576198 011.0014549020.1084.900000 $ 374.00 B220‐873 BlanceƩ Intelligent IN576198 011.0014549020.1084.900000 $ 9.35 B220056 BlanceƩ B220056 Reducer IN576198 011.0014549020.1084.900000 $ 26.48 Freight IN576198 011.0014549020.1084.900000 $ 122.24 Sales Tax 9.5% IN576198020.1084.900000 $ 455.40 W.E. Anderson WE01 Ball Valves~ IN576208 011.0014550020.1084.900000 $ 447.95 BlanceƩ 1100 Turbine Flow Meter~ IN576208 011.0014550020.1084.900000 $ 374.00 BlanceƩ Intelligent Frequency IN576208 011.0014550020.1084.900000 $ 9.35 BlanceƩ B220056 Reducer Bushing~ IN576208 011.0014550020.1084.900000 $ 26.48 Freight IN576208 011.0014550020.1084.900000 $ 122.24 Sales Tax 9.5% IN576208020.1084.900000 $ 455.40 W.E. Anderson WE01 Ball Valves~ IN576209 011.0014551020.1084.900000 $ 447.95 BlanceƩ 1100 Turbine Flow Meter~ IN576209 011.0014551020.1084.900000 $ 374.00 BlanceƩ Intelligent Frequency Converter IN576209 011.0014551020.1084.900000 $ 9.35 BlanceƩ B220056 Reducer Bushing~ IN576209 011.0014551020.1084.900000 $ 26.48 Freight IN576209 011.0014551020.1084.900000 $ 122.24 Sales Tax 9.5% IN576209$ 4,306.2611/24/2020 606558011.1031.596200 $ 225.00 Pre‐Employment Polygraph Exam 202011006JOE MAR POLYGRAPH & INV SVC, I006399 ‐ $ 225.0011/24/2020 606559Printed: 12/3/2020 11:06:33AMPage 31 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1031.594200 $ 6.48 InterpretaƟon Services 4901358LANGUAGE LINE SERVICES, INC003272 ‐ $6.4811/24/2020 606560055.8000.900000 $ 5,750.00 Centron w/ 4G Modem~ 161761 055.0002774MCAVOY & MARKHAM ENGINEERING A000304 ‐ 055.8000.900000 $ 546.25 Sales Tax 9.5% 161761055.8000.900000 $ 11,500.00 Centron w/ 4G Modem~ 16335 055.0002788055.8000.900000 $ 1,092.50 Sales Tax 9.5% 16335055.8000.900000 $ 960.00 CENTRON, C1SDR3, CL200, 240V W:3, FM2S, 16453 055.0002831055.8000.900000 $ 7,728.00 CENTRONPOLY, CP1STR3, CL200, 120‐480V, 16453 055.0002831055.8000.900000 $ 825.36 Sales Tax 9.5% 16453$ 28,402.1111/24/2020 606561011.1031.596200 $ 35.82 TranscripƟon Services NT219NET TRANSCRIPTS, INC005272 ‐ $ 35.8211/24/2020 606562056.5600.595200 $ 889.20 Financial Support & Business 10374NEWGEN STRATEGIES & SOLUTIONS,006185 ‐ 056.5600.596200 $ 280.80 Financial Support & Business 10374$ 1,170.0011/24/2020 606563Printed: 12/3/2020 11:06:33AMPage 32 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE011.1046.520000 $ 542.02 Def Sensor~ PC810899827 011.0014528QUINN COMPANY001457 ‐ 011.1046.590000 $ 10.64 Freight PC810899827 011.0014528011.1046.520000 $ 51.49 Sales Tax 9.5% PC810899827011.1046.590000 $ 1.01 Sales Tax 9.5% PC810899827011.1046.520000 $ 20.16 Hex Nut~ PC810900896 011.0014611011.1046.520000 $ 24.24 Wheel Stud~ PC810900896 011.0014611011.1046.520000 $ 72.72 Wheel Stud~ PC810900896 011.0014611011.1046.520000 $ 11.13 Sales Tax 9.5% PC810900896$ 733.4111/24/2020 606564011.120010 $ 1,656.00 (0560‐300) CoƩon Knit Rags ~ 226472IN 011.0014640SANDLER BROS000179 ‐ 011.120010 $ 157.32 Sales Tax 9.5% 226472IN$ 1,813.3211/24/2020 606565055.9100.596200 $ 717.11 OperaƟng Expense 10/20 20836SO CAL JOINT POLE COMMITTEE002079 ‐ $ 717.1111/24/2020 606566011.1031.596200 $ 200.00 Medical Services 521140532STACY MEDICAL CENTER000380 ‐ $ 200.0011/24/2020 606567056.5600.590000 $ 4,999.04 Repair Damaged Gear Box CVEC20033THE CAMPBELL VALVE & ENGINEERI004750 ‐ $ 4,999.0411/24/2020 606568Printed: 12/3/2020 11:06:33AMPage 33 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020EARLY CHECKSVENDOR NAME AND NUMBERACCOUNTNUMBERINVOICEAMOUNTDESCRIPTIONINVOICEP.O.#PAYMENTAMOUNTCHECKNUMBERPAYMENTDATE020.1084.596200 $ 120.55 New Ticket Charges 1020200792UNDERGROUND SERVICE ALERT000449 ‐ 055.8300.596200 $ 120.55 New Ticket Charges 920200789055.8300.596200 $ 65.43 CA State Fee for Regulatory Costs DSB20195660020.1084.596200 $ 65.43 CA State Fee for Regulatory Costs DSB20196293$ 371.9611/24/2020 606569011.120010 $ 99.18 (2990‐501) Acribond Flat White ‐ D Base 202071192300 011.0014639VISTA PAINT CORPORATION005480 ‐ 011.120010 $ 99.18 (2990‐502) Acribond Flat White ‐ A Base 202071192300 011.0014639011.120010 $ 181.92 (2991‐500) Coverall Ext Flat White ‐ P 202071192300 011.0014639011.120010 $ 60.64 (2991‐501) Coverall Ext Flat White ‐ D 202071192300 011.0014639011.120010 $ 60.64 (2991‐502) Coverall Ext Flat White ‐A 202071192300 011.0014639011.120010 $ 716.60 (2995‐500) Coverall Ext Flat White ‐ P 202071192300 011.0014639011.120010 $ 358.30 (2995‐501) Coverall Ext Flat White ‐ D 202071192300 011.0014639011.120010 $ 358.30 (2995‐502) Coverall Ext Flat White ‐ A 202071192300 011.0014639011.120010 $ 358.30 (2997‐300) Coverall Flat White ‐ P Base 202071192300 011.0014639011.120010 $ 67.60 Paint Care RECYCLE FEE 202071192300 011.0014639011.120010 $ 241.97 Sales Tax 10.25 202071192300$ 2,602.6311/24/2020 606570020.1084.500140 $ 180.00 Water Quality TesƟng & ReporƟng W0K0275COVERNONWECK LABORATORIES, INC001628 ‐ $ 180.0011/24/2020 606571TOTAL EARLY CHECKS$ 147,104.47Printed: 12/3/2020 11:06:33AMPage 34 of 35 CITY OF VERNONOPERATING ACCOUNTWARRANT REGISTER NO. 58DECEMBER 15, 2020RECAP BY FUNDFUNDELECTRONIC TOTALEARLY CHECK TOTALWARRANT TOTALGRAND TOTALS$ 815,494.56$ 880,265.19$0.00$ 64,770.63011 ‐ GENERAL466,586.23502,721.390.0036,135.16020 ‐ WATER7,656,034.337,691,643.960.0035,609.63055 ‐ LIGHT & POWER13,152.7323,741.780.0010,589.05056 ‐ NATURAL GAS1,035.341,035.340.000.00057 ‐ FIBER OPTICGRAND TOTAL$9,099,407.66$0.00$147,104.47$8,952,303.19TOTAL CHECKS TO BE PRINTED 0Printed: 12/3/2020 11:06:33AMPage 35 of 35 City Council Agenda Item Report Agenda Item No. COV-427-2020 Submitted by: Adriana Ramos Submitting Department: Fire Department Meeting Date: December 15, 2020 SUBJECT Fire Department Activity Report Recommendation: Receive and file the September 2020 Report. Background: Attached is a copy of the Vernon Fire Department Activity Report which covers the period of September 1 through September 30, 2020. This report covers hours for Fire Prevention, Training, Pre-Incident, Periodic Testing, Public Service Programs, Routine Maintenance, and an incident summary sheet provided by LA County Fire (which is consistent with the new format). It is important to note that due to the COVID-19 pandemic resulting in the temporary closure of non-essential businesses and in adherence to the Los Angeles County Health Officer's Orders and guidelines for social distancing to minimize COVID-19 exposure, Fire inspections ceased during the months of April and May, impacting the year-to-date figures in the activity report. The Fire Department resumed inspections effective June 1, 2020. Fiscal Impact: There is no fiscal impact associated with this report. Attachments: 1. Fire Department Activity Report - 09/01/20 to 09/30/20 ACTIVITY TYPE This Period Last Year This This Year FIRE PREVENTION:Last Year To Date Period To Date Regular Inspections (#): 143 1096 0 117 Re-Inspections (#): 8 156 0 4 Spec. Haz. Inspections (#): 4 27 0 5 Total Inspections: 155 1279 0 126 Total Staff Hours: 231 1859 0 191 PRE-INCIDENT (HOURS): This Period Last Year This This Year Last Year To Date Period To Date Planning 204.5 1691.5 192 1647 District Familiarization 210.5 1686.5 180 1627 Total Hours: 415 3378 372 3274 PERIODIC TEST (HOURS): This Period Last Year This This Year Last Year To Date Period To Date Hose Testing 0 4 0 14 Pump Testing 3 24 16 77 Total Hours: 3 28 16 91 VERNON FIRE DEPARTMENT COMPANY ACTIVITIES September 1, 2020 to September 30, 2020 *Reduction in activity due to transitioning to electronic inspection reporting system. 0 200 400 600 800 1000 1200 1400 Last Year To Date Period To Date This Period Last Year This This Year Annual Business Fire Inspections Page 1 TRAINING (HOURS): This Period Last Year This This Year Last Year To Date Period To Date Firefighting 238 2166 245 2360 Hazardous Materials 66 613 68 707 Safety 232 2197 214 2091 Apparatus Operations 251 2278 254 1318 Equipment Operations 251 2278 259 2205 CPR 12 84 4 132 First Aid 101 726 129 1109 Total Hours: 1151 10342 1173 9922 PUBLIC SERVICE PROGRAMS (HOURS): This Period Last Year This This Year Last Year To Date Period To Date School Programs 8 36 0 6 Fire Brigades 0 16 0 12 Emergency Preparedness 41.5 245.5 49 416 Total Hours: 49.5 297.5 49 434 ROUTINE MAINTENANCE (HOURS): This Period Last Year This This Year Last Year To Date Period To Date Station 251 2253 257 2257 Apparatus 258 2244 260 2281 Equipment 256 2278 264 2325 Total Hours: 765 6775 781 6863 Personnel Activity Total By Hours: 2614.5 22679.5 2391 20775 245 68 214 254 259 4 129 1173 Fire Training Hours Firefighting Hazardous Materials Safety Apparatus Operations Equipment Operations CPR First Aid Page 2 Los Angeles County Fire Department CSL - Report City Details Alarm Date Time Basic Incident Number (FD1) Cad Initial Cad Incident Type Description Incident Type Commercial/ Residential Basic First Arrived At Scene Apparatus ID 09/01/20 LAC20263869 LAW Commercial BC13 09/02/20 LAC20264278 INJA 321 - EMS call, excluding vehicle accident with injury Commercial S164 09/04/20 LAC20266540 STRC 100 - Fire, other Commercial E165 09/15/20 LAC20278925 SICKA 321 - EMS call, excluding vehicle accident with injury Residential S163 09/16/20 LAC20280153 GRS 143 - Grass fire Commercial E163 09/17/20 LAC20281361 EMS Commercial S164 09/17/20 LAC20281558 TCT 600 - Good intent call, other Commercial S163 09/17/20 LAC20281625 STRC Commercial BC13 09/25/20 LAC20290014 GASI Commercial BC13 09/25/20 LAC20290295 ALRWF Commercial E7579 City Council Agenda Item Report Agenda Item No. COV-417-2020 Submitted by: Gregory Garcia Submitting Department: Police Department Meeting Date: December 15, 2020 SUBJECT Police Department Activity Report Recommendation: Receive and file the October 2020 Report. Background: The Vernon Police Department's activity report consists of activity during the specified reporting period, including a summary of calls for service, and statistical information regarding arrests, traffic collisions, stored and impounded vehicles, recovered stolen vehicles, the number of citations issued, and the number of reports filed. Fiscal Impact: There is no fiscal impact associated with this report. Attachments: 1. Police Department Activity Report – October 2020 Type VERNON POLICE DEPARTMENT Department Activity Report Jurisdiction: First Date: Last Date: 10/01/2020 10/31/2020 Department All Units Primary Unit VERNON Description Complaint VPD 10-6 OFFICER IS 10-6 C7,961,962,10-10, WASH, EQUIPM 231 224 10-96C 10-96 CHARLES (CITY HALL SECURITY CHECK)9 9 10-96H PICK UP THE JAIL PAPER WORK FROM HP JAIL 3 3 140 SUPPLEMENTAL REPORT 5 4 166R COURT ORDER VIOLATION REPORT 7 5 20001 INJURY HIT AND RUN 5 2 20001R INJURY HIT AND RUN REPORT 9 2 20002 NON-INJURY HIT AND RUN 13 6 20002R NON-INJURY HIT AND RUN REPORT 18 11 211 ROBBERY 3 1 211R ROBBERY REPORT 7 4 211S SILENT ROBBERY ALARM 5 1 242 BATTERY 3 2 242R BATTERY REPORT 3 2 314 INDECENT EXPOSURE 3 1 415 DISTURBING THE PEACE 51 16 422R TERRORIST THREATS REPORT 3 2 451R ARSON REPORT 4 2 459 BURGLARY 6 2 459A AUDIBLE BURGLARY ALARM 263 131 459R BURGLARY REPORT 16 10 459S SILENT BURGLARY ALARM 11 5 459V BURGLARY TO A VEHICLE 5 2 459VR BURGLARY TO A VEHICLE REPORT 10 6 476R FRAUD REPORT 1 1 484 PETTY THEFT 21 6 484R PETTY THEFT REPORT 21 15 487R GRAND THEFT REPORT 36 19 5150 SUBJECT WITH MENTAL DISABILITIES 5 1 586 PARKING PROBLEM 60 50 586E PARKING ENFORCEMENT 4 3 594 VANDALISM 28 9 594R VANDALISM REPORT 29 19 602 TRESPASS 71 33 602R TRESPASS REPORT 1 1 647F DRUNK IN PUBLIC 4 1 901 UNKNOWN INJURY TRAFFIC COLLISION 13 4 901T INJURY TRAFFIC COLLISION 28 7 901TR INJURY TRAFFIC COLLISION REPORT 3 1 902T NON-INJURY TRAFFIC COLLISION 108 59 902TR NON-INJURY TRAFFIC COLLISION REPORT 3 2 909E TRAFFIC ENFORCEMENT 8 4 909T TRAFFIC HAZARD 12 10 911 911 MISUSE / HANGUP 3 2 911A CONTACT THE REPORTING PARTY 23 16 911NR 911 CALL NO RESPONSE REQUIRED 2 1 917A ABANDONED VEHICLE 6 3 1Page of 311/03/2020 06:42:13 Type VERNON POLICE DEPARTMENT Department Activity Report Jurisdiction: First Date: Last Date: 10/01/2020 10/31/2020 Department All Units Primary Unit VERNON Description Complaint VPD 925 SUSPICIOUS CIRCUMSTANCES 106 41 927 UNKNOWN TROUBLE 10 3 A459R ATTEMPT BURGLARY REPORT 5 1 A459VR ATTEMPT BURGLARY TO A VEHICLE REPORT 1 1 A487R ATTEMPT GRAND THEFT REPORT 3 1 ASSISTFD ASSIST FIRE DEPARTMENT 30 11 BOSIG BROKEN SIGNAL OR LIGHT 4 2 BOVEH BROKEN DOWN VEHICLE 16 13 CIVIL CIVIL MATTER 6 5 CODE5 SURVEILLANCE/STAKE-OUT 5 1 COP COP DETAIL 10 8 DEMOSTRA DEMONSTRATION 25 19 DET DETECTIVE INVESTIGATION 59 30 DETAIL DETAIL 3 3 DPTAST DEPARTMENTAL ASSIST 2 1 FILING OFFICER IS 10-6 REPORT WRITING 162 156 FOUND FOUND PROPERTY REPORT 2 2 FU FOLLOW UP 23 19 GTA GRAND THEFT AUTO 4 1 GTAR GRAND THEFT AUTO REPORT 32 24 HBC HAILED BY A CITIZEN 10 6 ID THEFT RPT IDENTITY THEFT REPORT 2 2 ILLDPG RPT ILLEGAL DUMPING REPORT 2 1 KTP KEEP THE PEACE 3 1 LOCATE LOCATED VERNON STOLEN VEHICLE / PLATES VI 4 4 LOJACK LOJACK HIT 5 5 LPR LICENSE PLATE READER 7 4 MISPLOCATE LOCATED MISSING PERSON REPORT 4 2 PANIC ALARM PANIC ALARM/DURESS ALARM 3 1 PAPD PUBLIC ASSIST-POLICE 24 13 PATCK PATROL CHECK 338 238 PEDCK PEDESTRIAN CHECK 76 37 PLATE LOST OR STOLEN PLATES REPORT 1 1 PRSTRAN PRISONER TRANSPORTED 2 2 REC RECOVERED STOLEN VEHICLE IN THE FIELD 43 19 RECKLESS DR RECKLESS DRIVING (23103)16 8 REPO REPOSSESSION 4 4 RR RAIL ROAD PROBLEM 1 1 SEAACA SEAACA ANIMAL CALLS 2 1 SHOTS SHOTS 6 1 SPEED SPEED CONTEST OR SPEEDING (23109)4 2 SRMET SRMET DETAIL 19 15 TRAFFIC STOP TRAFFIC STOP 166 90 UNATTACHED UNATTACHED TRAILER 2 2 VCK VEHICLE CHECK 161 107 VEH RELEASE VEHICLE RELEASE 3 3 VMCVIO VERNON MUNICIPAL CODE VIOLATION 1 1 2Page of 311/03/2020 06:42:13 Type VERNON POLICE DEPARTMENT Department Activity Report Jurisdiction: First Date: Last Date: 10/01/2020 10/31/2020 Department All Units Primary Unit VERNON Description Complaint VPD WARRANT WARRANT ARREST 4 2 WELCK WELFARE CHECK 32 15 Department: 2636 1650 Overall: 2636 1650 3Page of 311/03/2020 06:42:13 VERNON POLICE DEPARTMENT Police Activity Report Period Ending: 10/31/20 TRAFFIC COLLISIONS NO. PROPERTY RECOVERED TOTAL 44 VEHICLES: $47,000.00 NON-INJURY 32 INJURY 12 Persons Injured 18 Pedestrian 1 Fatalities 0 City Property Damage 6 Hit & Run (Felony) 1 Hit & Run (Misdemeanor) 10 VEHICLES STORED PROPERTY RECOVERED FOR Unlicensed Driver/Impounded Vehicle 7 OTHER DEPARTMENTS Unattached Trailer 2 VEHICLES: $149,000.00 Abandoned/Stored Vehicle 8 Traffic Hazard 0 CITATIONS Citations Iss (Prisoner Release) 71 Citations Iss (Other Violations) 0 Parking 88 Hazardous 12 Non-Hazardous 12 Citations Iss (Moving) 24 Citations Iss (Total) 112 CASES CLEARED BY ARREST AR20-337 CR20-1668 594(B)(1) PC AR20-361 CR20-1815 594.2(A) PC AR20-338 CR20-1679 11364(A) HS AR20-362 CR20-1816 10851(A) VC AR20-339 CR20-1681 459 PC AR20-363 CR20-1818 381(B) PC AR20-340 CR20-1691 459 PC AR20-341 CR20-1706 11352 HS AR20-343 CR20-1707 459 PC AR20-346 CR20-1718 10851(A) VC AR20-347 CR20-1720 10851(A) VC AR20-348 CR20-1738 11364(A) HS AR20-351 CR20-1744 10851(A) HS AR20-352 CR20-1748 487(A) PC AR20-354 CR20-1759 602(M) PC AR20-357 CR20-1789 484(A) PC AR20-359 CR20-1808 166(A)4 PC AR20-360 CR20-1810 602 PC MALE FEMALE TOTAL BURGLARY (& ATTEMPTED)5 5 CARRY CONCEALED DIRK OR DAGGER 0 CRIMINAL THREATS 0 DOMESTIC VIOLENCE 0 GRAND THEFT: AUTO (& ATTEMPTED)314 GRAND THEFT: PROPERTY (& ATTEMPTED)22 TRANSPORT/SELL NARCOTICS 2 2 WARRANT (VERNON CASE)0 WARRANT (OUTSIDE AGENCY)0 TOTAL FELONY ARRESTS 12 1 13 MALE FEMALE TOTAL COURT ORDER VIOLATION 1 1 CONTRIBUTE TO DELINQUENCY OF A MINOR 0 DRIVING W/SUSPENDED LICENSE 0 DRIVING UNDER THE INFLUENCE 1 1 PETTY THEFT 1 1 POSSESSION OF NARCOTICS 0 POSSESSION OF NITROUS OXIDE 1 1 POSSESSION OF PARAPHERNALIA 1 1 2 PUBLIC NUISANCE 0 RESISTING ARREST 0 TRESPASSING 4 4 VANDALISM 2 2 WARRANT (VERNON CASE) 3 3 WARRANT (OUTSIDE AGENCY)0 TOTAL MISD. ARRESTS 13 2 15 MALE FEMALE TOTAL BURGLARY 0 CARRY LOADED FIREARM IN PUBLIC 0 ROBBERY 0 VANDALISM 0 WARRANT 0 TOTAL JUVENILES DET. 0 0 0 121 237 4 362 VERNON POLICE DEPARTMENT REPORT FOR PERSONS ARRESTED ADULT FELONY ARRESTS AND DISPOSITIONS PERIOD ENDING: 10/31/2020 ADULT MISDEMEANOR ARRESTS AND DISPOSITIONS JUVENILES DETAINED --- FELONY AND MISDEMEANOR TOTAL FELONY ARRESTS (ADULT) TO DATE: TOTAL MISDEMEANOR ARRESTS (ADULT) TO DATE: TOTAL JUVENILES DETAINED (FELONY AND MISDEMEANOR) TO DATE: TOTAL ARRESTS AND DETAINED JUVENILES (FELONY AND MISDEMEANOR) TO DATE: VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/01/202010/01/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010178965025 E SLAUSON AV, VERNONA487RSSS INVESTMENT06:42:5210/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201656 CA0197300VPDSALDANA,CARLOS*32E06:45:33 06:46:0406:48:32VPDNEWTON,TODD31E07:48:0708:37:5907:50:18VPDSWINFORD,PHILLIP4107:25:2507:41:51202010179033055 FRUITLAND AV, VERNON594RPOPULAR 2109:40:1810/01/2020RPTNRDDepartmentOCA NumberRMS JurisVPD CR20201657 CA0197300VPDNEWTON,TODD*31E10:07:16 10:07:1711:56:0210:16:27202010179043737 S SOTO, VERNON415MCDONALDS09:57:5110/01/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201658 CA0197300VPDCERDA,PAUL,JR*32W09:59:4311:51:0310:05:52VPDNEWTON,TODD31E10:58:2010:49:54VPDSWINFORD,PHILLIP4110:00:4611:25:3310:05:49VPDENCINAS,ANTHONY5D3110:49:5910:03:35VPDMARTINEZ,GABRIELS509:59:45 10:11:1610:57:5210:49:51202010179074501 DOWNEY RD, VERNON211RGEE GEE LIQUOR11:00:3110/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201659 CA0197300VPDMARTINEZ,GABRIEL*S511:40:3511:25:31VPDSWINFORD,PHILLIP4112:04:5611:43:27202010179222600 E 28TH, VERNON5150FEDEX19:20:3510/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201661 CA0197300VPD*4019:22:2920:27:5019:26:43VPD31E19:22:4823:18:0319:26:52VPD32W19:23:4619:25:12VPD41W19:25:1520:46:5419:26:451Page of 210/02/202004:31:45 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/01/202010/01/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010179222600 E 28TH, VERNON5150FEDEX19:20:3510/01/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201661 CA0197300VPDLANDA,RAFAELXS21:16:2519:34:21* Denotes Primary Unit2Page of 210/02/202004:31:45 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/02/202010/02/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201017952S SOTO // 46TH, VERNON902T10:59:5210/02/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201662 CA0197300VPDCERDA,EUGENIO*40W11:41:1610:59:52202010179562601 S SOTO, VERNON594RJOE K S RESTAURANT11:55:2710/02/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201663 CA0197300VPDCERDA,EUGENIO*40W12:05:47 12:06:2212:49:1412:06:23202010179673651 SIERRA PINE AV, VERNONRECGABRIEL MORALES15:38:5110/02/2020RPTVRECDepartmentOCA NumberRMS JurisVPD CR20201665 CA0197300VPDNEWTON,TODD*3215:41:4415:43:18VPDCERDA,PAUL,JR41E15:43:1716:44:24202010179684820 E 50TH, VERNONREPOBON APPETIT15:43:5210/02/2020RPTREPODepartmentOCA NumberRMS JurisVPD CR20201664 CA0197300VPDRECORDS BUREAU*RECD16:13:0115:44:44202010179922011 E 49TH, VERNON415GORILLA AUTO PRODUCTS22:20:3510/02/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201666 CA0197300VPDMADRIGAL,ALFONSO*40W22:22:06 22:22:1023:01:5022:24:09VPDGODOY,RAYMOND3122:22:07 22:22:1123:01:5022:23:40VPDMANNINO,NICHOLAS32E23:01:5022:23:14VPDCROSS,JEREMYS423:01:5122:23:22* Denotes Primary Unit1Page of 110/03/202005:08:15 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/03/202010/03/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010180022100 E 38TH, VERNONTRAFFIC STOP00:09:0210/03/20201015VIRPTDepartmentOCA NumberRMS JurisVPD CR20201667 CA0197300VPDMADRIGAL,ALFONSO*40W01:56:1400:09:02VPDGODOY,RAYMOND3101:56:16 02:54:4700:09:04VPDCAM,PATRICK41E00:31:3202:19:2800:33:39VPDREDONA,BRYAN43W01:56:2201:37:07VPDCROSS,JEREMYS400:10:03 00:10:0301:56:2300:31:28202010180113737 S SOTO, VERNON594MCDONALD`S RESTAURANTS03:14:5910/03/20201015CITERPTDepartmentOCA NumberRMS JurisVPD CR20201668 CA0197300VPDMANNINO,NICHOLAS*32E03:16:28 03:16:3104:14:3703:21:43VPDGODOY,RAYMOND3103:52:2803:22:08VPDMADRIGAL,ALFONSO40W03:16:29 03:16:3204:14:3703:19:11VPDREDONA,BRYAN43W04:14:3803:25:07VPDCROSS,JEREMYS404:14:3803:18:52202010180175993 MALBURG WY, VERNON S/A `484RTULLY WIHR07:06:4210/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201669 CA0197300VPDFLORES,TERESA*38E07:21:4808:25:1107:28:37202010180223851 S SOTO, VERNON594RCONCENTRA09:42:2510/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201670 CA0197300VPDDOCHERTY,MICHAEL*4309:44:53 09:45:3810:21:3709:52:40202010180414423 BANDINI BL, VERNON594RDOLLAR EMPIRE16:47:2410/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201672 CA0197300VPDFLORES,TERESA*38E16:57:41 16:58:0317:12:361Page of 310/04/202005:10:00 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/03/202010/03/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010180414423 BANDINI BL, VERNON594RDOLLAR EMPIRE16:47:2410/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201672 CA0197300VPDDOCHERTY,MICHAEL43W17:32:23 17:32:2418:14:5017:37:07VPDONOPA,DANIELS717:32:1617:32:1920201018042E 37TH // SOTO, VERNON901TANTONIO17:05:4010/03/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201671 CA0197300VPDNEWTON,TODD*32W17:06:38 17:07:0318:00:5117:11:50VPDFLORES,TERESA38E18:09:5317:12:43VPDCERDA,EUGENIO40E17:08:4818:09:5317:09:16VPDONOPA,DANIELS717:31:0117:08:4220201018045BANDINI BL // ATLANTIC BL, VERNON901TLASO18:12:4510/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201673 CA0197300VPDCERDA,EUGENIO*40E18:13:40 18:14:0919:07:4018:22:21VPDLUCAS,JASON2219:07:3419:02:19VPD32E18:45:5919:07:3518:53:51VPDFLORES,TERESA38E18:15:0319:07:3718:21:19VPDCAM,PATRICK41W18:47:2119:07:4118:51:34VPDDOCHERTY,MICHAEL43W18:15:0619:13:0118:16:36202010180462000 E 25TH, VERNON459V18:32:3310/03/2020VSDepartmentOCA NumberRMS JurisVPD CR20201674 CA0197300VPDNEWTON,TODD*32W19:05:3418:32:3320201018054E VERNON AV // SOTO ST, VERNONTRAFFIC STOP21:12:0610/03/2020CITEVSRPTDepartmentOCA NumberRMS JurisVPD CR20201675 CA0197300VPDCAM,PATRICK*41W21:50:3521:12:072Page of 310/04/202005:10:00 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/03/202010/03/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018054E VERNON AV // SOTO ST, VERNONTRAFFIC STOP21:12:0610/03/2020CITEVSRPTDepartmentOCA NumberRMS JurisVPD CR20201675 CA0197300VPDMADRIGAL,ALFONSO32E21:43:1421:13:09VPDREDONA,BRYAN43W21:12:10 21:12:1021:49:1821:13:15202010180552011 E 49TH, VERNONPATCKGORILLA AUTO PRODUCTS21:42:5410/03/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201676 CA0197300VPDMANNINO,NICHOLAS*40E21:43:09 21:43:1122:27:1421:48:47VPDLUCAS,JASON2221:43:10 21:43:1322:27:1321:49:26VPDMADRIGAL,ALFONSO32E21:43:1622:27:1321:45:33VPDCAM,PATRICK41W21:50:3822:27:1421:53:12VPDREDONA,BRYAN43W21:49:2222:27:1421:51:35* Denotes Primary Unit3Page of 310/04/202005:10:00 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/04/202010/04/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010180682501 E 27TH, VERNON594INERMODA02:00:3710/04/20201015RPTDepartmentOCA NumberRMS JurisVPD CR20201679 CA0197300VPDMANNINO,NICHOLAS*40E02:04:40 02:04:4004:14:0502:25:31VPDCAM,PATRICK41W03:09:5902:17:31VPDREDONA,BRYAN43W02:05:0303:09:3202:14:36VPDCROSS,JEREMYS402:32:0502:16:51202010180712011 E 49TH, VERNON902TGORILLA AUTO PRODUCTS02:07:1610/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201677 CA0197300VPDMADRIGAL,ALFONSO*32E02:33:3502:08:38VPDLUCAS,JASON2202:33:5202:28:1620201018073S ALAMEDA // 55TH, VERNON20002RLAPD #29102:12:2010/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201678 CA0197300VPDMADRIGAL,ALFONSO*32E02:34:0503:18:02 03:21:5302:34:09VPDLUCAS,JASON2202:34:0603:21:5202:34:07202010180922241 E 49TH, VERNON487RUNK11:46:5010/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201680 CA0197300VPDFINO,MARCUS*31W11:50:15 11:50:1613:16:5312:19:08202010181014310 MAYWOOD AV, VERNON459VRUNK15:14:1310/04/20201015RPTDepartmentOCA NumberRMS JurisVPD CR20201681 CA0197300VPDFLORES,TERESA*38E15:15:29 15:15:3017:21:2515:18:04VPDVILLEGAS,RICHARD4115:16:1117:08:2315:18:03VPDDOCHERTY,MICHAEL4317:21:2515:17:24202010181021Page of 210/05/202005:13:54 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/04/202010/04/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010181023049 E VERNON AV, VERNON242RFARMER JOHN16:33:1310/04/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201682 CA0197300VPDFINO,MARCUS*31W17:32:2316:38:32* Denotes Primary Unit2Page of 210/05/202005:13:54 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/05/202010/05/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010181322011 E 49TH, VERNONPATCKGORILLA AUTO PRODUCTS01:01:0210/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201683 CA0197300VPDCROSS,JEREMY*s403:55:2601:01:02VPDLUCAS,JASON2201:01:07 01:01:1003:18:1701:17:11VPDSALDANA,CARLOS32E01:01:05 01:01:0903:54:3401:07:24VPDCAM,PATRICK41W01:03:1503:18:1901:04:22VPDREDONA,BRYAN4303:54:3601:23:50202010181492263 E VERNON AV, VERNON459RREFORMATION07:04:2310/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201684 CA0197300VPDFLORES,TERESA*38W07:06:54 07:06:5507:57:4707:07:2120201018151S ATLANTIC BL // DISTRICT BL, VERNON902T08:24:2710/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201685 CA0197300VPDZOZAYA,OSCAR*40E09:54:2408:24:27VPDVALENZUELA,FERNANDO32E08:50:5408:42:20202010181543375 E SLAUSON AV, VERNONA459RWALTERS WHOLESALE ELECTRIC08:40:2610/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201688 CA0197300VPDVILLEGAS,RICHARD*4308:42:48 08:43:3309:41:5808:46:19VPDFINO,MARCUS31W08:42:49 08:43:3409:35:1508:46:47VPDVALENZUELA,FERNANDO32E08:50:5410:20:2808:54:33VPDFLORES,TERESA38W08:52:1309:35:1909:03:49VPDCHAVEZ,JERRY,JRS109:05:1109:37:4809:12:45202010181566200 MALBURG WY, VERNON594RLBA REALTY08:45:5610/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201686 CA0197300VPDFINO,MARCUS*31W09:35:1509:57:2009:37:43VPDFLORES,TERESA38W09:35:19 09:35:2009:43:0909:38:201Page of 310/06/202004:22:20 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/05/202010/05/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010181572425 E 30TH, VERNON487REVERLY09:31:1210/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201687 CA0197300VPDVILLEGAS,RICHARD*4309:41:5910:09:43 11:00:5809:50:04VPDFLORES,TERESA38W09:43:0910:07:1709:57:24VPDCHAVEZ,JERRY,JRS109:42:0010:02:2809:57:28202010181602425 E 30TH, VERNON487R11:01:2510/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201689 CA0197300VPDVILLEGAS,RICHARD*4311:11:4611:01:25202010181704423 E DISTRICT BL, VERNON459RA PLUS VEGETABLES12:49:3510/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201690 CA0197300VPDVALENZUELA,FERNANDO*32E12:52:19 12:52:1913:34:2113:00:16202010181833828 S SANTA FE AV, VERNON459VLUMI15:34:0210/05/20201015RPTDepartmentOCA NumberRMS JurisVPD CR20201691 CA0197300VPDFINO,MARCUS*31W15:35:5219:04:5115:36:35VPDVALENZUELA,FERNANDO32E15:37:2115:46:5115:38:25VPDFLORES,TERESA38W15:36:1716:23:3215:46:11VPDVILLEGAS,RICHARD4315:35:5516:23:3515:39:37202010181932328 E VERNON AV, VERNONID THEFT RPTVICTORIA DEAPEAU17:59:3710/05/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201692 CA0197300VPDVALENZUELA,FERNANDO*32E18:04:5418:54:5218:08:39202010182074151 BANDINI BL, VERNONVCK21:28:1410/05/2020DARPTDepartmentOCA NumberRMS JurisVPD CR20201693 CA01973002Page of 310/06/202004:22:20 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/05/202010/05/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010182074151 BANDINI BL, VERNONVCK21:28:1410/05/2020DARPTDepartmentOCA NumberRMS JurisVPD CR20201693 CA0197300VPDARANA,ANDRE*40W21:55:0421:28:14VPDSALDANA,CARLOS32E21:55:0421:28:17* Denotes Primary Unit3Page of 310/06/202004:22:20 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/06/202010/06/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010182362322 E 51ST, VERNON487RBARGAIN BANK08:32:1510/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201694 CA0197300VPDFINO,MARCUS*31W08:41:22 08:41:3509:05:0308:44:40202010182432110 E 51ST, VERNON925CALPLASTICS11:03:5510/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201695 CA0197300VPDVALENZUELA,FERNANDO*32E11:04:49 11:05:2411:49:3111:12:28VPDFINO,MARCUS31W11:05:3412:35:1211:08:27VPDZOZAYA,OSCAR41E11:05:5611:59:0011:15:49202010182444927 ALCOA AV, VERNON459RFLAMINGO CONSTRUCTION11:16:5310/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201696 CA0197300VPDVILLEGAS,RICHARD*43W12:59:1611:28:48202010182535151 ALCOA AV, VERNONGTARROSE AND SHORE13:41:2610/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201697 CA0197300VPDVALENZUELA,FERNANDO*32E13:44:1214:23:4913:47:31202010182602465 FRUITLAND AV, VERNON211RWANG GLOBAL NET15:41:4610/06/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201698 CA0197300VPDVALENZUELA,FERNANDO*32E15:43:2716:36:3415:47:15VPDFINO,MARCUS31W15:55:3615:44:03* Denotes Primary Unit1Page of 110/07/202003:45:33 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/07/202010/07/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010182854305 S SANTA FE AV, VERNON48400:13:3910/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201699CA0197300VPDESTRADA,IGNACIO*S302:06:3000:15:47VPDVASQUEZ,LUIS1STOF02:06:3001:05:05VPDLANDA,RAFAEL4300:16:3100:27:4900:16:51VPDSANTOS,DANIELS200:27:4000:16:50202010183102955 E VERNON AV, VERNON594RCALIFORNIA ALUMINUM09:12:3810/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201700CA0197300VPDSWINFORD,PHILLIP*43W09:30:1310:36:2409:41:10202010183184489 BANDINI BL, VERNON484RBAKERY DEPOT11:32:3610/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201701CA0197300VPDVALENZUELA,FERNANDO*32E11:33:41 11:35:3912:16:4411:46:43202010183274825 E DISTRICT BL, VERNONGTARSKY DENTAL13:33:4410/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201702CA0197300VPDSTEVENSON,KENT,JR*31E13:36:29 13:36:5613:37:21VPDVALENZUELA,FERNANDO32E14:39:4213:37:19202010183344767 E 49TH, VERNONA459VR16:22:3710/07/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201703CA0197300VPDVALENZUELA,FERNANDO*32E17:19:5916:22:3720201018336E SLAUSON AV // ALCOA AV, VERNON902TT-MOBILE USA16:26:3810/07/2020RPTORDepartmentOCA NumberRMS JurisVPDCR20201704CA0197300VPDSTEVENSON,KENT,JR*31E16:28:4017:20:2316:34:20VPDCERDA,PAUL,JR41W16:29:0717:52:3416:30:581Page of 110/08/202000:16:04 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/08/202010/08/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010183734310 MAYWOOD AV, VERNON459VRUNK07:27:4610/08/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201705 CA0197300VPDNEWTON,TODD*31E07:32:35 07:33:3508:15:1007:41:5320201018386GRAND // CALIFORNIA, VERNONTRAFFIC STOP12:37:5910/08/2020RPT1015VIDepartmentOCA NumberRMS JurisVPD CR20201706 CA0197300VPDSTEVENSON,KENT,JR*32E15:47:2812:37:59VPDCERDA,EUGENIO40W12:38:2714:09:3412:47:51VPDSWINFORD,PHILLIP4313:01:05 13:01:1614:09:31202010183922618 FRUITLAND AV, VERNON45914:44:3810/08/2020RPT1015DepartmentOCA NumberRMS JurisVPD CR20201707 CA0197300VPDCERDA,PAUL,JR*41W14:45:33 14:48:1516:40:1414:49:27VPDNEWTON,TODD31E14:45:38 14:48:1616:50:4814:49:25VPDCERDA,EUGENIO40W17:13:0815:08:5520201018394E 55TH // ALAMEDA, VERNON901TT-Mobile USA 888-662-4662 opt 416:55:2110/08/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201708 CA0197300VPDCERDA,PAUL,JR*41W16:55:46 16:55:5817:58:3517:16:05VPDNEWTON,TODD31E17:44:1717:06:08VPDSWINFORD,PHILLIP4316:56:3117:41:0717:01:04202010183974515 BANDINI BL, VERNONGTARGTS17:42:5110/08/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201709 CA0197300VPDNEWTON,TODD*31E17:44:20 17:45:0018:50:1817:58:19202010184021Page of 210/09/202001:05:06 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/08/202010/08/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018402E 46TH // SOTO, VERNONREC19:27:0910/08/2020VRECVSDepartmentOCA NumberRMS JurisVPDCR20201710CA0197300VPDMADRIGAL,ALFONSO*32W20:10:4819:27:09VPDGODOY,RAYMOND38W19:28:3820:08:3219:30:17202010184054305 S SANTA FE AV, VERNON166R20:23:5810/08/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201711CA0197300VPDMANNINO,NICHOLAS*31E20:24:5221:37:3820:29:36* Denotes Primary Unit2Page of 210/09/202001:05:06 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/09/202010/09/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018414SEVILLE AV // FRUITLAND AV, VERNONREC02:33:5710/09/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201712 CA0197300VPDMANNINO,NICHOLAS*31E02:34:3702:33:57VPDMADRIGAL,ALFONSO32W03:27:3402:34:36VPDGODOY,RAYMOND38W02:35:3803:27:3502:42:34202010184295335 S DISTRICT BL, VERNON487RCAL SDM08:26:1010/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201713 CA0197300VPDDOCHERTY,MICHAEL*43E08:27:39 08:42:5508:28:16 09:07:07202010184303340 LEONIS BL, VERNON20002RLUCKY BRAND JEANS08:46:5110/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201714 CA0197300VPDCERDA,PAUL,JR*4108:49:21 08:49:5408:51:18VPDNEWTON,TODD31W08:54:3509:18:3508:59:03202010184432939 S SUNOL DR, VERNON20002RGREENLAND FOODS12:50:0710/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201715 CA0197300VPDDOCHERTY,MICHAEL*43E12:53:50 12:54:1613:41:0813:05:21VPDCERDA,PAUL,JR4113:21:2613:21:33202010184464305 S SANTA FE AV, VERNON14013:49:3910/09/2020SUPVPDDOCHERTY,MICHAEL*43E13:49:39 13:54:2614:32:4013:54:2720201018457ALAMO AV // 52D PL, VERNONPATCK20:50:3510/09/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201716 CA0197300VPDMADRIGAL,ALFONSO*41E21:41:3220:50:35VPDGODOY,RAYMOND38E20:58:5221:41:3220:59:241Page of 210/10/202005:25:40 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/09/202010/09/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018465AYERS AV // 26TH, VERNONVCK22:34:5410/09/2020RPTFIDepartmentOCA NumberRMS JurisVPDCR20201717CA0197300VPDMADRIGAL,ALFONSO*41e23:22:5922:34:55VPDGODOY,RAYMOND38E22:35:3323:22:5922:38:57* Denotes Primary Unit2Page of 210/10/202005:25:40 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/10/202010/10/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018470ALCOA AV // LEONIS BL, VERNONREC00:02:3110/10/20201015VRECRPTCITEDepartmentOCA NumberRMS JurisVPDCR20201718CA0197300VPDMADRIGAL,ALFONSO*41E00:04:21 00:04:2203:13:4700:06:04VPDGODOY,RAYMOND38E02:07:0800:06:14VPDMANNINO,NICHOLAS40W03:13:4700:13:26VPDCAM,PATRICK43W03:13:4700:08:43202010184845837 S DISTRICT BL, VERNON902T08:09:5610/10/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201719CA0197300VPDCERDA,EUGENIO*3208:41:4808:10:03VPDFLORES,TERESA38E08:37:2408:15:36202010184943390 E SLAUSON AV, VERNONVCK12:37:1210/10/2020VRECRPT1015DepartmentOCA NumberRMS JurisVPDCR20201720CA0197300VPDFLORES,TERESA*38E14:48:3412:37:12VPDCERDA,EUGENIO3212:39:2013:43:5712:43:02VPDDOCHERTY,MICHAEL43W12:38:36 12:38:3613:44:1712:43:03VPDPEREZ,NICKL213:44:1612:43:04202010184985051 E DISTRICT BL, VERNONGTAR17:54:3410/10/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201721CA0197300VPDFLORES,TERESA*38E17:59:42 17:59:4218:05:4418:05:05VPDCERDA,EUGENIO3219:38:3918:05:42* Denotes Primary Unit1Page of 110/11/202006:36:53 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/11/202010/11/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010185133480 E 26TH, VERNON902TM TEXTILE03:28:0310/11/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201722CA0197300VPDGODOY,RAYMOND*38E03:30:32 03:30:3304:12:24 05:55:0903:39:25VPDCAM,PATRICK4303:50:45 03:50:4604:56:1703:56:57202010185163278 E SLAUSON AV, VERNON925AMPM04:50:3410/11/2020VSRPTDepartmentOCA NumberRMS JurisVPDCR20201723CA0197300VPDMADRIGAL,ALFONSO*41W04:52:46 04:52:4706:37:4004:56:12VPDGODOY,RAYMOND38E06:29:4605:57:43VPDCAM,PATRICK4304:56:2306:55:1105:01:10VPDCROSS,JEREMYS404:53:22 04:53:3004:56:3420201018532GRANDE VISTA AV // WASHINGTON BL, VERNONREC16:07:3410/11/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201724CA0197300VPDFINO,MARCUS*32W17:04:0916:07:34* Denotes Primary Unit1Page of 110/12/202004:52:57 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/12/202010/12/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010185772288 E 27TH, VERNON902TR06:33:3910/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201725 CA0197300VPDCAM,PATRICK*43W07:14:1506:33:39VPDSALDANA,CARLOS31E06:33:4307:13:3506:37:20202010185812800 E 50TH, VERNONGTARAMERICAN INTEGRATED SERVICES07:39:1410/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201727 CA0197300VPDFINO,MARCUS*32E07:40:30 07:40:3115:15:0707:51:2720201018583E 44TH // BOYLE AV, VERNON901TT-Mobile USA, Inc.07:51:4010/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201726 CA0197300VPDVILLEGAS,RICHARD*XS07:52:2808:14:1007:54:04VPDFLORES,TERESA38W07:54:5008:21:0507:57:29VPDZOZAYA,OSCAR4008:21:0507:56:48202010185882465 FRUITLAND AV, VERNON487RWANG GLOBAL NET09:52:2710/12/2020RPTRPTDepartmentOCA NumberRMS JurisVPD CR20201730 CA0197300VPD CR20201731 CA0197300VPDFLORES,TERESA*38W10:13:05 10:13:0611:23:2110:16:3820201018589SOTO//VERNON, VERNON211RNURSE VERONICA10:00:5910/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201729 CA0197300VPDFINO,MARCUS*32E10:09:18 10:09:1911:20:1510:14:15202010185904890 S ALAMEDA, VERNON459RW & W CONCEPTS10:14:3010/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201732 CA0197300VPDZOZAYA,OSCAR*4010:15:53 10:15:5310:21:11VPDFINO,MARCUS32E11:21:14 11:21:1412:01:3311:31:571Page of 310/13/202004:45:23 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/12/202010/12/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018591LEONIS BL // ALCOA AV, VERNON902TWALTER10:17:0110/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201728 CA0197300VPDPEREZ,NICK*L210:21:0010:21:03VPDZOZAYA,OSCAR4010:21:1211:20:5810:25:05202010185942770 LEONIS BL, VERNON S/A 100GTARBEALS.4.U11:32:2410/12/2020RPTVRECDepartmentOCA NumberRMS JurisVPD CR20201733 CA0197300VPDZOZAYA,OSCAR*4011:48:3312:40:3711:58:08202010185984341 E DISTRICT BL, VERNONGTAREPIC TEXTILES13:19:1710/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201734 CA0197300VPDFINO,MARCUS*32E13:20:49 13:20:4914:51:5813:27:49202010186065203 DOWNEY RD, VERNON459VRWEST PICO DISTRIBUTOR15:23:5410/12/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201735 CA0197300VPDZOZAYA,OSCAR*4015:27:23 15:27:2617:00:4015:49:43202010186092801 LEONIS BL, VERNONSRMETLA VILLA GRILL16:22:4610/12/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201736 CA0197300VPDFINO,MARCUS*32E16:24:47 16:25:0619:11:0316:28:03VPDFLORES,TERESA38W16:24:49 16:25:0817:34:5216:29:13VPDZOZAYA,OSCAR4018:14:5317:00:42202010186245981 MALBURG WY, VERNONVCK20:22:4310/12/2020VSDepartmentOCA NumberRMS JurisVPD CR20201737 CA0197300VPDSALDANA,CARLOS*20E21:13:5120:22:432Page of 310/13/202004:45:23 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/12/202010/12/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010186252916 S SANTA FE AV, VERNONVCK20:40:0310/12/20201015CITERPTDepartmentOCA NumberRMS JurisVPDCR20201738CA0197300VPDARANA,ANDRE*31W21:12:1720:40:03VPDLUCAS,JASON4120:41:2721:12:17VPDCAM,PATRICK4320:40:54 20:40:5521:12:1720:43:18* Denotes Primary Unit3Page of 310/13/202004:45:23 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/13/202010/13/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010186345383 ALCOA AV, VERNONGTART TILE00:16:2710/13/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201739 CA0197300VPDARANA,ANDRE*31W00:20:13 00:20:1301:21:1700:24:09VPDSALDANA,CARLOS20E00:36:0401:21:1700:38:44202010186572618 FRUITLAND AV, VERNON459RVACANT BUILDING08:47:3410/13/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201740 CA0197300VPDVILLEGAS,RICHARD*4309:21:1810:01:0709:25:40202010186632465 FRUITLAND AV, VERNON140WANG GLOBAL NET10:46:4910/13/2020SUPVPDVILLEGAS,RICHARD*4311:07:44 11:07:5511:08:58VPDVALENZUELA,FERNANDO32E11:08:5611:19:1211:13:08202010186725608 S SOTO, VERNON459R13:22:4710/13/2020VOIDDepartmentOCA NumberRMS JurisVPD CR20201741 CA0197300VPDRECORDS BUREAU*recd14:57:2613:34:37VPDFINO,MARCUS31W14:10:5214:10:59202010186753500 E WASHINGTON BL, VERNON92514:52:2610/13/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201742 CA0197300VPDVALENZUELA,FERNANDO*32E14:52:46 14:54:2116:04:2514:59:20VPDFINO,MARCUS31W14:53:00 14:54:2316:04:2515:00:48VPDVILLEGAS,RICHARD4314:54:3816:04:2515:00:46VPDZOZAYA,OSCARMET116:04:2615:24:17202010186774305 S SANTA FE AV, VERNONWARRANT16:14:2010/13/2020RPT10151Page of 210/14/202001:52:15 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/13/202010/13/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010186774305 S SANTA FE AV, VERNONWARRANT16:14:2010/13/2020RPT1015VPDHERNANDEZ,EDWARD*5D3216:54:4616:14:20VPDESCOBEDO,ALEXY5D3316:54:4716:20:01202010186924310 MAYWOOD AV, VERNON487RJOSE MONTOYA20:48:4110/13/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201743CA0197300VPDARANA,ANDRE*31E20:52:39 20:55:1221:24:1020:57:52* Denotes Primary Unit2Page of 210/14/202001:52:15 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/14/202010/14/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187085526 S SOTO, VERNONPEDCK02:34:5310/14/20201015RPTVPDSALDANA,CARLOS*20W04:29:0702:34:54VPDARANA,ANDRE31E03:09:3802:35:0120201018716S SOTO // 26TH, VERNONREC06:55:2110/14/2020VREC1015RPTDepartmentOCA NumberRMS JurisVPD CR20201744 CA0197300VPDCHAVEZ,JERRY,JR*S107:39:5006:57:36VPDSTEVENSON,KENT,JR22W06:59:2407:04:19VPDCERDA,PAUL,JR32E09:09:1907:55:26VPDARANA,ANDRE40E06:57:5707:21:5007:03:59VPDMADRIGAL,ALFONSO41W06:59:3108:04:0007:04:00202010187184333 MAYWOOD AV, VERNONRECFRESH PACKING07:15:0310/14/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201745 CA0197300VPDZOZAYA,OSCAR*40E07:21:5407:58:5307:26:3020201018720E 26TH // MINERVA, VERNONFOUNDELI ZEPEDA07:20:1410/14/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201747 CA0197300VPDSWINFORD,PHILLIP*31W08:28:2609:40:5008:35:1320201018722E 46TH // SOTO, VERNON901TRERIC07:57:2810/14/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201746 CA0197300VPDZOZAYA,OSCAR*40E07:58:45 07:59:1308:33:3408:01:47VPDFINO,MARCUS31W08:24:2608:04:12VPDCHAVEZ,JERRY,JRS108:01:5608:22:4608:03:20202010187241Page of 310/15/202003:45:25 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/14/202010/14/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187243333 DOWNEY RD, VERNON487RUPS09:09:4610/14/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201748 CA0197300VPDSTEVENSON,KENT,JR*22W09:59:4109:23:42202010187383333 DOWNEY RD, VERNONDET11:28:3510/14/20201015VSRPTVPDHERRERA,GUSTAVO*5D3022:28:5700:23:2511:28:35VPDREYNA,JOSE S5D2322:28:5723:12:16 22:28:0511:38:39VPDENCINAS,ANTHONY5D3122:28:5700:23:2611:38:37VPDHERNANDEZ,EDWARD5D3222:28:5800:23:2611:38:38VPDESCOBEDO,ALEXY5D3322:28:5800:23:2611:38:38VPDVELEZ,MARISSA5D3422:28:0711:38:39202010187513482 E 26TH, VERNON901TJULIO SERMAN16:31:0810/14/2020RPTORVSDepartmentOCA NumberRMS JurisVPD CR20201749 CA0197300VPDZOZAYA,OSCAR*40E16:31:34 16:32:2117:43:2016:34:37VPDSTEVENSON,KENT,JR22W17:39:5116:38:08VPDSWINFORD,PHILLIP31W16:32:5117:19:5616:35:18VPDCERDA,PAUL,JR32E16:39:3117:02:2316:41:54VPDCHAVEZ,JERRY,JRS117:08:2916:39:38202010187554901 BANDINI BL, VERNON602PREFERRED FREEZER18:07:3110/14/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201750 CA0197300VPDCERDA,PAUL,JR*32E18:08:49 18:09:0519:18:4818:17:34VPDSTEVENSON,KENT,JR22W19:08:5518:18:30VPDARANA,ANDRE31E18:58:2120:30:3119:05:47VPDSWINFORD,PHILLIP31W18:08:50 18:09:0618:58:1318:21:21VPDGODOY,RAYMOND38W19:09:4619:07:462Page of 310/15/202003:45:25 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/14/202010/14/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187554901 BANDINI BL, VERNON602PREFERRED FREEZER18:07:3110/14/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201750CA0197300VPDARANA,ANDRE40E19:07:2719:05:53* Denotes Primary Unit3Page of 310/15/202003:45:25 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/15/202010/15/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010187804199 BANDINI BL, VERNONPLATEJose Aguilar00:25:1610/15/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201751 CA0197300VPDGODOY,RAYMOND*38W00:26:29 00:26:3001:05:0700:36:29202010187853220 E 26TH, VERNON594RSEVEN UP01:27:0510/15/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201752 CA0197300VPDARANA,ANDRE*31E01:41:33 01:41:3302:33:0601:47:052020101879548TH // SANTA FE, VERNONVCK07:46:3010/15/2020VSRPTDepartmentOCA NumberRMS JurisVPD CR20201753 CA0197300VPDNEWTON,TODD*32W08:41:1207:46:30202010187972820 LEONIS BL, VERNON902TMAYLAND08:12:4110/15/2020RPTCITYDepartmentOCA NumberRMS JurisVPD CR20201754 CA0197300VPDSWINFORD,PHILLIP*40E08:14:09 08:14:5408:57:3608:14:55202010187991875 E 27TH, VERNONREC08:51:5010/15/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201755 CA0197300VPDCERDA,PAUL,JR*43W08:55:41 08:56:4809:59:3608:59:43VPDSWINFORD,PHILLIP40E08:57:3709:48:0409:02:42202010188003300 BANDINI BL, VERNONGTARSILK & DOLLAR10:00:1810/15/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201756 CA0197300VPDSTEVENSON,KENT,JR*22E10:03:42 10:04:0311:19:2810:09:33202010188073883 S SOTO, VERNONRECFARMER JOHN12:46:1610/15/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201757 CA01973001Page of 210/16/202004:13:08 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/15/202010/15/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010188073883 S SOTO, VERNONRECFARMER JOHN12:46:1610/15/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201757CA0197300VPDNEWTON,TODD*32W12:51:22 12:51:5013:46:2113:19:02VPDSTEVENSON,KENT,JR22E12:53:0113:43:5712:58:0520201018812PACIFIC // FRUITLAND AV AVE., VERNON20001ATLAY15:03:0510/15/2020RPTVIORDepartmentOCA NumberRMS JurisVPDCR20201758CA0197300VPDNEWTON,TODD*32W15:04:45 15:05:1215:45:2815:07:38VPDSTEVENSON,KENT,JR22E15:44:5715:23:52VPDSWINFORD,PHILLIP40E15:44:5415:07:54202010188254305 S SANTA FE AV, VERNON10-96C19:35:4110/15/20201015VPDESTRADA,IGNACIO*S319:56:1719:35:41* Denotes Primary Unit2Page of 210/16/202004:13:08 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/16/202010/16/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010188514280 MAYWOOD AV, VERNONPEDCK01:24:1410/16/20201015RPTDepartmentOCA NumberRMS JurisVPDCR20201759CA0197300VPDMADRIGAL,ALFONSO*40E03:18:5001:24:14VPDMANNINO,NICHOLAS20W01:26:1403:39:3901:27:28VPDGODOY,RAYMOND38E01:24:3203:57:1401:27:22VPDLANDA,RAFAEL43W01:25:2703:39:4801:30:30VPDESTRADA,IGNACIOS303:18:5501:24:18202010188763226 E 44TH, VERNONREPOMOLA INC14:46:4610/16/2020RPTREPODepartmentOCA NumberRMS JurisVPDCR20201760CA0197300VPDRECORDS BUREAU*RECD15:27:3214:48:48202010188774300 E DISTRICT BL, VERNON459RCLASSIC SLIPCOVERS15:19:3510/16/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201761CA0197300VPDDOCHERTY,MICHAEL*43E15:22:01 15:22:3416:10:5215:32:54* Denotes Primary Unit1Page of 110/18/202005:53:02 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/17/202010/17/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010189043341 E 50TH, VERNONGTARMARTIN01:55:5010/17/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201762 CA0197300VPDMANNINO,NICHOLAS*38E01:59:11 02:00:0403:42:4302:02:35VPDGODOY,RAYMOND3202:03:5102:06:17 03:42:4302:07:4120201018915FRUITLAND AV // PACIFIC BL, VERNON415ANTONIO06:29:2410/17/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201763 CA0197300VPDMANNINO,NICHOLAS*38E06:32:0307:53:3106:34:31VPDFLORES,TERESA31E07:35:5208:39:2407:40:01VPDGODOY,RAYMOND3207:55:3806:34:29VPDNEWTON,TODD32W08:39:2506:50:34VPDMADRIGAL,ALFONSO40W07:58:3506:50:51VPDCAM,PATRICK4306:32:0607:47:1006:34:33VPDONOPA,DANIELS707:55:0107:11:15202010189213121 FRUITLAND AV, VERNONGTARJAVIER SHOP REPAIR08:00:4510/17/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201764 CA0197300VPDCERDA,EUGENIO*40E08:02:43 08:03:1309:07:1808:10:3820201018925ATLANTIC // DISTRICT, VERNON20002REZEQUIEL RIVERA09:54:1310/17/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201765 CA0197300VPDCERDA,EUGENIO*40E09:59:46 10:00:0510:52:0310:38:59VPDFLORES,TERESA31E10:47:0010:23:4420201018926E 37TH // SANTA FE AV, VERNON451R10:39:2510/17/2020RPTVIDepartmentOCA NumberRMS JurisVPD CR20201766 CA0197300VPDNEWTON,TODD*32W10:40:38 10:40:3912:07:4810:43:04VPDDOCHERTY,MICHAEL43W10:41:0211:29:231Page of 210/18/202005:51:38 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/17/202010/17/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201018936S ALAMEDA // 25TH, VERNON901T16:32:3310/17/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201767CA0197300VPDDOCHERTY,MICHAEL*43W17:10:3516:32:33VPDCERDA,EUGENIO40E16:34:39 16:35:0917:10:3516:43:37202010189392011 E 49TH, VERNON415FEC STUDIOS17:37:0010/17/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201768CA0197300VPDNEWTON,TODD*32W17:38:02 17:38:2718:57:0817:40:24VPDMADRIGAL,ALFONSO2018:45:4818:48:4518:47:15VPD20W19:52:2718:47:45VPDFLORES,TERESA31E17:38:3018:55:5517:41:45VPDGODOY,RAYMOND3818:46:3818:48:21VPDMANNINO,NICHOLAS38E19:56:0118:47:56VPDMANNINO,NICHOLAS4019:56:0119:52:24VPDCERDA,EUGENIO40E17:38:3218:59:2217:41:48VPDDOCHERTY,MICHAEL43W19:56:0218:24:17VPDMANNINO,NICHOLAS4418:45:0818:55:4818:46:20VPDCROSS,JEREMYS419:56:0218:47:59VPDONOPA,DANIELS717:40:3819:53:0817:41:56* Denotes Primary Unit2Page of 210/18/202005:51:38 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/18/202010/18/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010189955502 ALCOA AV, VERNONREC13:07:3410/18/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201770CA0197300VPDFLORES,TERESA*38E13:46:1513:07:34VPDDOCHERTY,MICHAEL3113:07:3613:33:5813:11:1720201018996E 55TH // ALAMEDA, VERNON20002R13:34:1310/18/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201771CA0197300VPDDOCHERTY,MICHAEL*3114:05:0313:34:13202010190114309 FRUITLAND AV, VERNONGTARGENERAL MILLS19:05:1310/18/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201772CA0197300VPDCAM,PATRICK*3119:07:32 19:07:3319:14:36 20:10:4119:35:04VPDARANA,ANDRE26E19:43:59 19:43:5919:44:10* Denotes Primary Unit1Page of 110/19/202002:07:50 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/19/202010/19/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010190303463 E 26TH, VERNON902TNOE/UPS01:27:5810/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201773 CA0197300VPDSALDANA,CARLOS*38W01:29:49 01:30:1602:03:1601:33:29VPDCAM,PATRICK3101:29:50 01:30:1802:48:4201:33:40VPDCROSS,JEREMYS401:32:3202:48:4320201019046FRUITLAND AV // DOWNEY RD, VERNONVCK07:25:1410/19/2020VSRPTDepartmentOCA NumberRMS JurisVPD CR20201774 CA0197300VPDZOZAYA,OSCAR*4008:02:0507:25:20202010190533801 S SANTA FE AV, VERNON459RTHREE ANGELS SCREEN PRINTING08:23:3510/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201775 CA0197300VPDRAMOS,JOSE*1STOF08:36:2308:29:23VPDFLORES,TERESA38W08:35:4609:48:5108:41:49202010190755524 ALCOA AV, VERNON487RSTYLES ON DEMAND15:01:3910/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201776 CA0197300VPDFLORES,TERESA*38W15:03:16 15:03:1615:03:37VPDFINO,MARCUS31E15:03:30 15:03:3115:38:2315:08:35202010190852764 LEONIS BL, VERNON902TRHOME EXTRAS INC16:18:0010/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201777 CA0197300VPDFINO,MARCUS*31E16:20:0517:22:1416:28:04202010190862330 E 57TH, VERNONGTARJETRO CASH AND CARRY16:21:0510/19/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201778 CA0197300VPDFLORES,TERESA*38W16:31:09 16:31:0917:34:3616:49:561Page of 210/20/202001:09:09 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/19/202010/19/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019090E WASHINGTON BL // DOWNEY RD, VERNONREC17:46:3710/19/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201779CA0197300VPDZOZAYA,OSCAR*4018:10:0817:46:37VPDFLORES,TERESA38W17:54:0717:54:2520201019091E 55TH // SANTA FE AV, VERNON902TMIRIAM GONZALEZ17:53:0710/19/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201780CA0197300VPDFLORES,TERESA*38W17:54:2719:05:3618:00:24VPDZOZAYA,OSCAR4018:11:1618:25:0118:13:36202010191012223 INDIANA AVE, LOS ANGELESLOCATEABSOLUTE TOWING20:10:1210/19/2020VRECVPDRECORDS BUREAU*RECD21:19:1220:11:26* Denotes Primary Unit2Page of 210/20/202001:09:09 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/202010/20/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010191412099 E 27TH, VERNONGTARFOOD CASTLE08:58:3310/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201781 CA0197300VPDVALENZUELA,FERNANDO*32W09:37:3609:42:47 11:09:1009:45:45202010191462528 S SANTA FE AV, VERNONILLDPG RPTUNK10:46:5910/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201782 CA0197300VPDVILLEGAS,RICHARD*4010:53:31 10:54:0011:00:41 12:01:1311:01:05VPDFINO,MARCUS38E10:58:5212:01:1311:04:3120201019158E DISTRICT BL // LOMA VISTA AV, VERNONPEDCK13:31:3010/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201783 CA0197300VPDVILLEGAS,RICHARD*4014:39:3513:31:30VPDZOZAYA,OSCARMET113:31:5614:55:0513:44:20202010191602678 E 26TH, VERNON594RCOMMERCIAL SANDBLAST13:37:5010/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201785 CA0197300VPDVALENZUELA,FERNANDO*32W13:58:5014:00:57 14:39:2114:10:25202010191613275 E VERNON AV, VERNON917A13:54:1710/20/2020VIDepartmentOCA NumberRMS JurisVPD CR20201784 CA0197300VPDFINO,MARCUS*38E13:58:1914:01:02 14:36:3814:02:53USTOWUS TOW14:09:10 14:10:4814:36:3814:29:35202010191642929 LEONIS BL, VERNON211RBEST ORIENTAL PRODUCE14:48:3410/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201786 CA0197300VPDFINO,MARCUS*38E14:53:4117:04:0614:55:11VPDVELEZ,MARISSA5D3415:31:5215:26:041Page of 311/03/202006:51:24 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/202010/20/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene2020101917055TH // BANDERA, VERNONLOCATELAPD NEWTON16:24:3410/20/2020VREC202010191725527 S DISTRICT BL, VERNON902TUNK16:58:3110/20/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201787 CA0197300VPDVILLEGAS,RICHARD*4017:00:5118:10:3117:09:03VPDARANA,ANDRE32W17:11:0017:20:40VPDFINO,MARCUS38E17:04:1118:10:3117:13:39MR C TOWMR C TO17:34:09 17:34:2518:10:3217:56:56202010191745200 SAN GABRIEL PL, PICO RIVERALOCATELASO PICO17:54:5410/20/2020VREC20201019176S DISTRICT BL // ATLANTIC BL, VERNON902TPAM18:18:5710/20/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201788 CA0197300VPDFINO,MARCUS*38E18:19:1818:53:3018:20:21VPDSALDANA,CARLOS20E18:46:30 18:46:3118:51:46VPDVILLEGAS,RICHARD4019:09:3418:21:48USTOWUS TOW18:33:18 18:33:4719:09:3518:53:35202010191804305 S SANTA FE AV, VERNON48418:49:3410/20/2020RPT1015DepartmentOCA NumberRMS JurisVPD CR20201789 CA0197300VPDARANA,ANDRE*26W19:51:3018:50:05VPDSALDANA,CARLOS20E19:35:4119:13:15VPDSALDANA,CARLOS20W18:50:5519:13:1118:51:41VPDFINO,MARCUS38E18:54:0319:01:51VPDLANDA,RAFAEL4319:32:5218:51:552Page of 311/03/202006:51:24 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/20/202010/20/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010191904265 CHARTER AV, VERNONREC22:56:2410/20/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201790CA0197300VPDSALDANA,CARLOS*20E23:42:5522:56:25MR C TOWMR C TO23:10:05 23:11:2923:42:5623:16:07* Denotes Primary Unit3Page of 311/03/202006:51:24 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/21/202010/21/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019193S SOTO // VERNON AV, VERNON20002OSCAR PEREZ00:00:1310/21/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201791 CA0197300VPDARANA,ANDRE*26W00:01:24 00:01:2500:29:1300:02:51VPDSALDANA,CARLOS20E00:01:3300:13:1200:02:57VPDLANDA,RAFAEL4300:29:1300:05:2320201019210E 25TH // ALAMEDA, VERNONREC07:42:0810/21/2020VRECDepartmentOCA NumberRMS JurisVPD CR20201792 CA0197300VPDSWINFORD,PHILLIP*4307:56:3709:18:4708:02:18202010192133094 E VERNON AV, VERNONREPO10:07:0410/21/2020REPODepartmentOCA NumberRMS JurisVPD CR20201793 CA0197300VPDRECORDS BUREAU*RECD10:58:4310:09:13202010192155500 S BOYLE AV, VERNON487RSTYLE MELODY INC10:16:1610/21/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201794 CA0197300VPDCERDA,PAUL,JR*40E10:25:24 10:27:2111:31:5610:57:04VPDVALENZUELA,FERNANDO32W10:54:0511:13:1310:56:52VPDSWINFORD,PHILLIP4310:53:4610:54:08202010192244305 S SANTA FE AV, VERNON166R12:31:2010/21/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201795 CA0197300VPDRECORDS BUREAU*RECD14:18:4713:14:36202010192293700 E 26TH, VERNON902TUNK14:42:5910/21/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201796 CA0197300VPDCERDA,PAUL,JR*40E14:44:45 14:44:5515:57:4414:51:37VPDVALENZUELA,FERNANDO32W15:03:4415:57:4415:11:101Page of 210/22/202004:46:29 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/21/202010/21/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010192293700 E 26TH, VERNON902TUNK14:42:5910/21/2020RPTORDepartmentOCA NumberRMS JurisVPDCR20201796CA0197300VPDZOZAYA,OSCAR3815:03:3415:03:46202010192322600 E 28TH, VERNONFOUNDFEDEX16:08:3410/21/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201797CA0197300VPDVALENZUELA,FERNANDO*32W16:11:4517:29:0316:23:14* Denotes Primary Unit2Page of 210/22/202004:46:29 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/22/202010/22/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010192655050 S SANTA FE AV, VERNON594RROGERS POULTRY03:37:5810/22/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201798 CA0197300VPDSALDANA,CARLOS*31W03:41:00 03:41:4104:30:2003:45:13VPDARANA,ANDRE26E04:23:3903:45:35202010192668800 WHITTER BLVD, PICO RIVERALOCATEMR C`S03:47:2010/22/2020VRECVPDRECORDS BUREAU*RECD04:26:5504:22:3920201019270111th // LORRIANE, LYNWOODLOCATEKRUGER TOW05:20:5010/22/2020VRECVPDRECORDS BUREAU*RECD05:30:4505:22:0720201019276E 50TH // BOYLE AV, VERNONVCK08:19:3510/22/2020VSVIRPTDepartmentOCA NumberRMS JurisVPD CR20201799 CA0197300VPDCERDA,PAUL,JR*32E10:02:2408:19:35VPDCERDA,EUGENIO31E11:27:0008:29:19202010192854305 S SANTA FE AV, VERNON166RVERNON POLICE DEPARTMENT12:12:5810/22/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201800 CA0197300VPDSWINFORD,PHILLIP*43W12:15:08 12:16:5412:18:55VPDREDONA,BRYAN2STOF13:09:3712:18:53202010192899500 ETIWANDA, RANCHO CUCAMONGAWARRANT14:16:1710/22/20201015VPDVELEZ,MARISSA*5D3415:49:1714:16:17VPDENCINAS,ANTHONY5D3115:49:1714:16:211Page of 210/23/202006:02:51 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/22/202010/22/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010192944950 S SANTA FE AV, VERNON484RCRYSTAL ART GALLERY15:39:5410/22/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201801CA0197300VPDREDONA,BRYAN*2STOF15:42:5416:12:1815:49:20* Denotes Primary Unit2Page of 210/23/202006:02:51 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/23/202010/23/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010193343843 S SOTO, VERNON594RVERNON & SOTO06:06:1810/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201802 CA0197300VPDMADRIGAL,ALFONSO*31E06:07:3506:35:4906:11:52VPDMANNINO,NICHOLAS20W06:08:5306:47:5506:35:50VPDGODOY,RAYMOND38E06:07:3706:37:4606:12:5220201019342HELIOTROPE ST // DISTRICT BL, VERNONGTART-Mobile USA 888-662-4662 opt 408:04:0310/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201803 CA0197300VPDCERDA,EUGENIO*31E08:05:58 08:07:0008:13:13 08:42:3208:13:3620201019351PACIFIC BL // SANTA FE AV, VERNON902TVERIZON WIRELESS 1-800-451-524212:22:5910/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201804 CA0197300VPDNEWTON,TODD*26W12:24:11 12:24:1413:12:2412:26:30VPDSTEVENSON,KENT,JR22W13:12:2412:26:07VPDCERDA,PAUL,JR32E12:55:1712:27:3820201019358S ATLANTIC BL // DISTRICT BL, VERNON20001RVERIZON WIRELESS 1-800-451-524213:40:3110/23/2020RPTCITYVRECDepartmentOCA NumberRMS JurisVPD CR20201805 CA0197300VPDCERDA,EUGENIO*31E13:44:1716:17:26 15:29:2814:13:09VPDSTEVENSON,KENT,JR22W13:55:3614:12:00VPDCERDA,PAUL,JR32E13:57:51 13:57:5215:03:1313:59:4320201019362S INDIANA // 26TH, VERNONGTARREHRIG PACIFIC15:36:3710/23/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201806 CA0197300VPDNEWTON,TODD*26W15:40:01 15:40:5116:27:1015:52:40202010193671Page of 210/24/202005:51:46 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/23/202010/23/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019367DOWNEY RD // EXCHANGE AV, VERNON902T17:46:4210/23/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201807CA0197300VPDCERDA,EUGENIO*31E17:49:14 17:49:1419:07:1317:54:41202010193875600 S ALAMEDA, VERNON S/A 100PATCK22:16:1410/23/2020RPT1015DepartmentOCA NumberRMS JurisVPDCR20201808CA0197300VPDMADRIGAL,ALFONSO*43W01:29:0522:16:14VPDGODOY,RAYMOND3222:17:2223:58:1022:30:25VPDMANNINO,NICHOLAS38E22:37:2023:41:3022:40:13VPDCROSS,JEREMYS422:37:2623:25:2123:14:33* Denotes Primary Unit2Page of 210/24/202005:51:46 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/24/202010/24/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010193954890 S ALAMEDA, VERNON594RW & W CONCEPTS01:54:5010/24/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201809 CA0197300VPDMADRIGAL,ALFONSO*43W01:56:3102:52:0601:59:45VPDGODOY,RAYMOND3201:57:4702:52:5401:59:43VPDMANNINO,NICHOLAS38E01:57:4503:00:3901:58:58VPDCROSS,JEREMYS402:58:5402:00:01202010194016TH // SAN JULIAN, VERNONLOCATELAPD CENTRAL06:06:5010/24/2020VRECVPDRECORDS BUREAU*RECD06:22:1706:22:06202010194044223 E DISTRICT BL, VERNON487RUNITED FRESH08:16:1910/24/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201811 CA0197300VPDFLORES,TERESA*20W08:18:15 08:18:4410:21:1508:26:20VPDCERDA,EUGENIO31E08:52:2708:46:51202010194055610 ALCOA AV, VERNONPEDCK08:46:4210/24/2020RPT1015CITEDepartmentOCA NumberRMS JurisVPD CR20201810 CA0197300VPDONOPA,DANIEL*S709:21:5908:46:44VPDNEWTON,TODD26W08:53:5409:23:5909:00:06VPDCERDA,EUGENIO31E08:52:3009:27:2708:53:58202010194074755 E 49TH, VERNON594RH&M09:41:1810/24/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201812 CA0197300VPDDOCHERTY,MICHAEL*32E09:43:46 09:44:4310:27:52202010194091Page of 210/25/202005:59:45 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/24/202010/24/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010194094623 MAYWOOD AV, VERNON487RWINIS AMERICA10:12:0610/24/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201813CA0197300VPDDOCHERTY,MICHAEL*32E10:42:2211:27:3810:54:39VPDFLORES,TERESA20W10:29:56 10:30:1210:31:18202010194324890 S ALAMEDA, VERNON459RW & W CONCEPT19:44:4810/24/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201814CA0197300VPDCAM,PATRICK*43E19:49:34 19:49:3420:30:4219:56:23VPDLUCAS,JASON2220:38:4220:05:20VPDMADRIGAL,ALFONSO3220:06:2621:01:0920:26:31VPDFLORES,TERESA38W20:12:5121:03:2520:26:2920201019433SEVILLE AV // VERNON AV, VERNONPEDCK20:38:1310/24/20201015CITERPTADVDepartmentOCA NumberRMS JurisVPDCR20201815CA0197300VPDCAM,PATRICK*43E21:39:5320:38:13VPDLUCAS,JASON2220:38:5021:39:5220:44:51VPDMADRIGAL,ALFONSO3221:31:1121:10:21* Denotes Primary Unit2Page of 210/25/202005:59:45 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/25/202010/25/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019456E DISTRICT BL // LOMA VISTA AV, VERNONREC02:42:4710/25/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201816CA0197300VPDMADRIGAL,ALFONSO*3206:25:4902:42:47VPDLUCAS,JASON2202:43:4406:13:39VPDMANNINO,NICHOLAS38W02:43:4304:05:1202:45:47VPDCAM,PATRICK43E02:43:02 02:43:0203:23:2502:43:53202010194603770 E WASHINGTON BL, VERNONREC04:54:3310/25/2020VSVRECRPTDepartmentOCA NumberRMS JurisVPDCR20201817CA0197300VPDCAM,PATRICK*43e06:40:3204:54:34VPDMANNINO,NICHOLAS38W04:54:35 04:54:3605:47:2905:00:14202010194714461 S SANTA FE AV, VERNON925CHERISH13:20:5010/25/20201015RPTDepartmentOCA NumberRMS JurisVPDCR20201818CA0197300VPDFLORES,TERESA*38W13:23:0014:33:4713:25:54VPDVILLEGAS,RICHARDXS13:23:0214:33:4713:41:1920201019480S ATLANTIC BL // BANDINI BL, VERNON20002ANA ORTIZ18:53:5510/25/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201819CA0197300VPD*31E18:55:46 18:55:4721:19:2319:03:24VPDLUCAS,JASON2219:51:3919:38:10VPDCAM,PATRICK43W19:45:3319:33:22* Denotes Primary Unit1Page of 110/26/202005:12:27 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/26/202010/26/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019507E 50TH // GIFFORD AV, VERNON2000205:02:0510/26/2020RPTCITYDepartmentOCA NumberRMS JurisVPD CR20201820 CA0197300VPDSALDANA,CARLOS*31E05:23:1205:02:0520201019508HELIOTROPE ST // DISTRICT BL, VERNON211T-Mobile USA 888-662-4662 opt 405:17:0710/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201821 CA0197300VPDLUCAS,JASON*2205:19:42 05:19:4606:10:3305:28:48VPDSALDANA,CARLOS31E05:23:1506:33:0705:26:19VPDCAM,PATRICK43W05:38:2106:04:0405:47:54202010195221844 E 27TH, VERNON484RVERNON SALES08:12:2810/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201822 CA0197300VPDFINO,MARCUS*32W08:13:56 08:14:1509:00:1608:20:03202010195273027 FRUITLAND AV, VERNON487RSAUL GAMBOA09:49:1710/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201824 CA0197300VPDFLORES,TERESA*38E09:52:41 09:52:4611:54:2010:02:09202010195312041 E 25TH, VERNON20002RUNIVERSAL10:44:5110/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201823 CA0197300VPDVILLEGAS,RICHARD*4310:51:2111:20:2011:02:26202010195362938 E 54TH, VERNON487RNEXT LEVEL APPAREL12:46:0410/26/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201825 CA0197300VPDFLORES,TERESA*38E12:48:28 12:49:0413:47:4912:57:25VPDVILLEGAS,RICHARD4313:47:4912:59:10202010195441Page of 210/27/202005:29:30 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/26/202010/26/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010195444440 E DISTRICT BL, VERNONGTARFRANCISCO GAMEZ STUDIOS14:49:0610/26/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201826CA0197300VPDFLORES,TERESA*38E14:52:4115:55:4315:02:09202010195564755 E DISTRICT BL, VERNON487RVERNON WELL SITE 2018:00:5810/26/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201827CA0197300VPDVILLEGAS,RICHARD*4318:02:32 18:03:3818:29:3618:07:37202010195674900 E 50TH, VERNON20002RSHOW ROOM INTERIOR19:40:5710/26/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201828CA0197300VPDSALDANA,CARLOS*26W19:43:49 19:43:5019:46:04VPDARANA,ANDRE31E19:44:4520:20:3819:52:45202010195762263 E VERNON AV, VERNONREPOTRUE RELIGION22:20:3510/26/2020REPODepartmentOCA NumberRMS JurisVPDCR20201829CA0197300VPDRECORDS BUREAU*RECD22:43:2222:21:04* Denotes Primary Unit2Page of 210/27/202005:29:30 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/27/202010/27/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010195793883 SOTO, VERNON484RFJ FOOD SERVICE00:13:4210/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201830 CA0197300VPDARANA,ANDRE*31E00:16:56 00:16:5600:48:0300:22:17202010195954433 EXCHANGE AV, VERNONGTARLA JUNCTION09:10:2610/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201832 CA0197300VPDGODOY,RAYMOND*38E09:12:0511:51:1309:16:46VPDFINO,MARCUS20W10:25:3910:26:35VPDVELEZ,MARISSA5D3409:26:5009:26:48202010195973636 E 26TH, VERNONMISPLOCATEUNK09:41:3710/27/2020RPTMETDepartmentOCA NumberRMS JurisVPD CR20201831 CA0197300VPDGODOY,RAYMOND*38E09:43:2610:26:4109:45:41VPDZOZAYA,OSCARMET109:45:1011:32:3610:03:3020201019608DOWNEY RD // 26TH, VERNON902T14:32:0510/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201833 CA0197300VPDGODOY,RAYMOND*38E14:32:1714:58:0914:35:09VPDFINO,MARCUS20W14:32:5714:58:0914:36:07202010196114809 ALCOA AV, VERNON484RGOLDEN STAR IMPORTS16:55:0210/27/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201834 CA0197300VPDGODOY,RAYMOND*38E16:57:52 16:57:5417:03:24 17:16:4716:57:53VPDVILLEGAS,RICHARD3217:16:4616:59:5920201019614E 26TH // SOTO, VERNONSRMETRENE MALDONADO17:27:3610/27/2020METRPTDepartmentOCA NumberRMS JurisVPD CR20201835 CA0197300VPDFINO,MARCUS*20W17:28:5417:44:3817:30:211Page of 210/28/202005:04:17 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/27/202010/27/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019614E 26TH // SOTO, VERNONSRMETRENE MALDONADO17:27:3610/27/2020METRPTDepartmentOCA NumberRMS JurisVPDCR20201835CA0197300VPDGODOY,RAYMOND38E17:28:5617:44:2617:35:16VPDZOZAYA,OSCARMET117:29:2319:16:0417:31:10* Denotes Primary Unit2Page of 210/28/202005:04:17 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/28/202010/28/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene20201019644CUDAHY // FRUITLAND AV, VERNON20002RLESTER ANDRADE00:39:0610/28/2020ASSTRPTDepartmentOCA NumberRMS JurisVPD CR20201836 CA0197300VPDSALDANA,CARLOS*20E00:42:0302:44:4000:43:5420201019651BANDINI BL // ATLANTIC BL, VERNON902TT-Mobile USA 888-662-4662 opt 404:55:0110/28/2020RPTVPDLANDA,RAFAEL*4104:55:5606:02:3705:01:10VPDSALDANA,CARLOS20E04:59:2406:02:3704:59:54VPDARANA,ANDRE31W04:57:0004:59:45 06:02:3705:47:48USTOWUS TOW05:12:02 05:12:5706:02:3805:43:38202010196664305 S SANTA FE AV, VERNON594RCLAUDIA ARRELLANO10:19:5710/28/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201837 CA0197300VPDSTEVENSON,KENT,JR*22W10:22:24 10:22:2810:51:0010:36:36202010196682959 E 50TH, VERNON242RCHARLIES PRIDE10:54:2810/28/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201838 CA0197300VPDZOZAYA,OSCAR*4311:01:21 11:06:3011:10:58VPDCERDA,PAUL,JR41E11:10:5511:57:3211:16:19202010196724305 S SANTA FE AV, VERNON166R12:22:3210/28/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201839 CA0197300VPDZOZAYA,OSCAR*4313:01:3013:04:21202010196843308 BANDINI BL, VERNON902TTRUCK TERMINAL18:19:2310/28/2020RPTORDepartmentOCA NumberRMS JurisVPD CR20201840 CA0197300VPDCERDA,PAUL,JR*41E18:22:08 18:22:1819:15:3418:27:05VPDSTEVENSON,KENT,JR22W19:02:0918:28:051Page of 210/29/202005:04:07 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/28/202010/28/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010196843308 BANDINI BL, VERNON902TTRUCK TERMINAL18:19:2310/28/2020RPTORDepartmentOCA NumberRMS JurisVPDCR20201840CA0197300VPDARANA,ANDRE31E18:56:5219:15:3318:58:51VPD38W18:58:4919:15:33VPDZOZAYA,OSCAR4318:22:2218:49:2818:28:03MR C TOWMR C TO18:41:4619:15:3419:03:20202010197003113 26TH ST, VERNONREC23:06:2110/28/2020VRECRPTDepartmentOCA NumberRMS JurisVPDCR20201841CA0197300VPDGODOY,RAYMOND*38W00:00:1223:06:21USTOWUS TOW23:26:42 23:27:1100:00:0823:48:56* Denotes Primary Unit2Page of 210/29/202005:04:07 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/29/202010/29/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197163049 E VERNON AV, VERNON484RFARMER JOHN08:26:2710/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201842 CA0197300VPDSTEVENSON,KENT,JR*22E08:27:0708:27:51VPDREDONA,BRYAN2STOF09:27:0608:29:5720201019719E 46TH // SOTO, VERNONUNATTACHEDTR09:49:2110/29/2020RPTVIDepartmentOCA NumberRMS JurisVPD CR20201843 CA0197300VPDCERDA,EUGENIO*31W11:14:1309:49:21USTOWUS TOW09:52:28 09:52:4811:24:4110:23:44202010197262660 E 37TH, VERNONGTARDUOCHI INC11:53:1510/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201844 CA0197300VPDOURIQUE,CARLOS*2STOF13:17:2912:40:25202010197272051 E 27TH, VERNONMISPLOCATEURGENT GEAR11:56:1310/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201846 CA0197300VPDCERDA,EUGENIO*31W11:57:57 11:58:2013:22:1211:58:24VPDSTEVENSON,KENT,JR22E11:59:01 11:59:0212:38:3612:03:07202010197294305 S SANTA FE AV, VERNON166R12:40:3210/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201845 CA0197300VPDCERDA,PAUL,JR*4113:01:18 13:01:1813:05:34VPDOURIQUE,CARLOS2STOF14:22:0913:17:35202010197331957 E VERNON AV, VERNON487RTRUST Y13:02:1910/29/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201847 CA0197300VPDCERDA,EUGENIO*31W13:22:18 13:22:4814:12:2813:23:401Page of 211/03/202006:53:11 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/29/202010/29/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197352910 S ALAMEDA, VERNONID THEFT RPTPROJECT ONE APPAREL13:46:5510/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201848CA0197300VPDCERDA,PAUL,JR*4113:49:32 13:49:3314:49:1814:00:3420201019738ROSS // 38TH, VERNON902TAPRIL14:47:3910/29/2020RPTORCITYDepartmentOCA NumberRMS JurisVPDCR20201849CA0197300VPDCERDA,EUGENIO*31W14:48:36 14:48:5915:39:3914:53:50VPDCERDA,PAUL,JR4116:25:0114:51:16MR C TOWMR C TO14:57:21 14:57:2215:59:5215:23:25202010197394717 E DISTRICT BL, VERNON487RVACANT14:46:5910/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201850CA0197300VPDSTEVENSON,KENT,JR*22E14:49:1215:58:2414:49:53202010197402627 S SOTO, VERNON451RJ AND K15:39:4310/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201851CA0197300VPDCERDA,EUGENIO*31W15:40:21 15:40:2216:24:4615:59:56VPDSTEVENSON,KENT,JR22E16:24:4516:00:53202010197474661 E DISTRICT BL, VERNON902TSLYVIA19:22:0010/29/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201852CA0197300VPDARANA,ANDRE*31E19:26:0920:19:3019:30:22VPD38W20:09:2219:31:28* Denotes Primary Unit2Page of 211/03/202006:53:11 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/30/202010/30/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197652301 E VERNON AV, VERNON484RARCADIA INC07:02:1810/30/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201853 CA0197300VPDCERDA,EUGENIO*43W07:15:5407:43:0707:19:50202010197675100 S DISTRICT BL, VERNON902TINDIO PRODUCTS08:08:5710/30/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201854 CA0197300VPDSTEVENSON,KENT,JR*22E08:11:28 08:11:3009:02:1708:18:29VPDCERDA,PAUL,JR4109:02:1708:18:0620201019770E 37TH // SEVILLE AV, VERNON902T08:46:2310/30/2020RPTDepartmentOCA NumberRMS JurisVPD CR20201855 CA0197300VPDCERDA,EUGENIO*43W08:49:50 08:49:5409:25:1808:54:3020201019774S SOTO // 50TH, VERNON902T11:16:4210/30/2020RPT S7CITYORDepartmentOCA NumberRMS JurisVPD CR20201857 CA0197300VPDCERDA,EUGENIO*43W12:54:0011:17:06VPDONOPA,DANIELS711:52:0712:27:47202010197943560 E VERNON AV, VERNON415VERNON CITY HOUSING18:31:4710/30/2020ASSTRPTDepartmentOCA NumberRMS JurisVPD CR20201859 CA0197300VPDSTEVENSON,KENT,JR*22E18:35:57 18:36:0119:36:3418:36:36VPD31W18:41:27 18:41:2818:55:35 19:36:3419:26:30VPDCERDA,PAUL,JR4118:35:5919:30:5018:39:18VPDCERDA,EUGENIO43W19:33:5118:54:42VPDCROSS,JEREMYS418:46:55 18:47:0019:36:3518:52:37202010197951Page of 210/31/202005:25:33 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/30/202010/30/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010197953113 26TH, VERNONGTAR18:42:5210/30/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201858CA0197300VPD*31W19:26:2718:55:37* Denotes Primary Unit2Page of 210/31/202005:25:33 VERNON POLICE DEPARTMENTCall Log Report Type All Unit Times and Location with OCA'sJurisdiction:First Date:Last Date:10/31/202010/31/2020Call Number DispTenCodeCaller AddressOfficerUnitDepUnit Time DispatchEnrouteDepartArriveRemoveCompVERNONReceivedComplaint OnScene202010198262600 45TH, VERNONREC11:36:5710/31/2020VRECDepartmentOCA NumberRMS JurisVPDCR20201860CA0197300VPDNEWTON,TODD*32E12:31:3811:36:57VPDFLORES,TERESA26W12:49:3111:45:33USTOWUS TOW11:56:04 11:56:3712:27:3712:20:33202010198283200 E WASHINGTON BL, VERNON487RPREFFERRED FREEZER13:37:0510/31/2020RPTDepartmentOCA NumberRMS JurisVPDCR20201861CA0197300VPDFLORES,TERESA*26W13:38:44 13:40:2713:41:15 14:19:3413:46:54* Denotes Primary Unit1Page of 111/03/202006:54:30 City Council Agenda Item Report Agenda Item No. COV-418-2020 Submitted by: Jazmine Hooks Submitting Department: Public Works Meeting Date: December 15, 2020 SUBJECT Arbor Day Foundation Application for Tree City USA Recommendation: A. Find that the proposed action is not subject to the California Environmental Quality Act (CEQA) as this application is not considered a “project” under CEQA which is defined as an action directly undertaken by a public agency which has the potential for resulting in either a direct physical change in the environment or a reasonably foreseeable indirect physical change in the environment, Cal. Pub. Res. Code Section 21065. Under the proposed application, no such activity is being undertaken. Even if the application were to be considered a “project” under CEQA, which is not the case, CEQA Guidelines Section 15308 categorically exempts actions taken by regulatory agencies that assure the maintenance, restoration, enhancement, or protection of the environment. Here, the request for authorization to submit an application to the Arbor Day Foundation will have no impact on the environment whatsoever; and B. Approve and authorize the Public Works Department to submit an application to the Arbor Day Foundation for Vernon to be Certified a Tree City USA for 2020. Background: The Arbor Day Foundation is a national non-profit organization dedicated to planting trees and improving the environment. The Arbor Day Foundation, in partnership with the U.S. Forest Services and National Association of State Foresters, recognizes cities throughout the nation under its Tree City USA program. The Tree City USA program provides direction, assistance, and national recognition to communities. Moreover, by becoming a Tree City USA, the City of Vernon is ensuring that its trees will benefit the community in many ways. For example, trees can reduce costs for energy, stormwater management, and erosion control; cut energy consumption by up to 25 percent; boost property values across the city; build strong ties to our community; educate our community about the value of trees and the importance of sustainable tree management, and increase community pride. To qualify for a Tree City USA designation, the City of Vernon must meet four standards established by the Arbor Day Foundation and the National Association of State Foresters: 1) Designate a responsible Tree Board/Department; 2) Adopt a Tree Ordinance; 3) Implement a Community Forestry Program with an annual budget of at least $2 per capita; and 4) Proclaim and Observe Arbor Day (not required for 2020 due to the COVID-19 pandemic). On November 19, 2019, the City adopted Ordinance No. 1263, the "Tree Ordinance." Furthermore, there were 125 trees planted and $100,000 (close to $500 per capita) was spent on tree maintenance. Vernon was designated as a Tree City USA in 2019. The proposed application would be submitted for Vernon to be certified a Tree City USA for 2020. The Department of Public Works’ efforts to maintain and expand the City’s urban forest continues and staff would like to ensure that the City’s efforts are recognized. As such, it is recommended that the Department of Public Works be authorized to submit an application to the Arbor Day Foundation for Vernon to be designated a Tree City USA. Fiscal Impact: There is no fiscal impact associated with this report. Attachments: 1. Arbor Day Foundation Tree City 2020 Application Dec 9, 2020 3:39 PM 2020 Tree City USA Application for Certification The Tree City USA award is in recognition of work completed by the community during the 2020 calendar year. Primary Contact Contact Name Daniel Wall Email Address:dwall@ci.vernon.ca.us Phone Number:(323) 583-8811 Address:4305 Santa Fe Avenue Vernon,CA 90058 City of Vernon, California Community Information Select Which Best Describes Your Community:Community has a Department Chair or City Manager Ordinance Date:Nov 19, 2019 Ordinance Uploaded Per Capita Expenditure:484.00 Arbor Day Date:Nov 19, 2019 Proclamation Uploaded As Mayor or Equivalent of the Community of City of Vernon ____________________________________________________________________________________________________ Mayor or Equivalent Signature Title Date Application Certification To Be Completed By The State Forester: City of Vernon The above named community has made formal application to this office. I am pleased to advise you that we reviewed the application and have concluded that, based on the information contained herein, said community is eligible to be certified as a Tree City USA community, for the 2020 calendar year, having in my opinion met the four standards required for recognition. ____________________________________________________________________________________________________ State Forester Signature Title Date ATTEST: ____________________________ Lisa Pope, City Clerk City Council Agenda Item Report Agenda Item No. COV-428-2020 Submitted by: Diana Figueroa Submitting Department: City Administration Meeting Date: December 15, 2020 SUBJECT Fiscal Year (FY) 2020/2021 Docket I Grants Awarded by Vernon CommUNITY Fund Grant Committee Recommendation: Receive and file the report, as it is being provided for informational purposes only, pursuant to Section 2.167(e) of the Vernon Municipal Code. Background: On November 18, 2020, the Vernon CommUNITY Fund Grant Committee (Grant Committee) held its first grant award meeting for the 2020/2021 Fiscal Year. There were eleven (11) Direct Service Grant applicants included on the first docket (listed below) and all were approved by the Grant Committee at the terms recommended: Direct Service Grantees 1) Alzheimer's Greater Los Angeles (Returning Grantee) - $17,475; 2) Camp TLC at East LA Rising - $48,850; 3) Center for Nonviolent Education & Parenting (Returning Grantee) - $40,000; 4) Chicas Rockeras South East Los Angeles - $25,000; 5) East LA Community Corporation (Returning Grantee) - $60,000; 6) Girl Scouts of Greater Los Angeles (Returning Grantee) - $30,000; 7) Girls on the Run of Los Angeles County (Returning Grantee) - $20,000; 8) Human Services Association (Returning Grantee) - $25,000; 9) Southeast Churches Service Center (Returning Grantee) - $50,000; 10) Woodcraft Rangers (Returning Grantee) - $30,000; and 11) YWCA Greater Los Angeles - $30,000. Section 2.167(e) of the Vernon Municipal Code requires the Grant Committee Executive Director (City Administrator) provide the City Council a report of the grant related actions taken by the Grant Committee within 30 days of any regular meeting and within 15 days of any special meeting at which grants are awarded. Fiscal Impact: The Fiscal Year 2020/2021 Docket I total grant award amount of $373,325 is included in the 2020/2021 City Budget and is within the fiscal year allocations for this type of grant award. Attachments: City Council Agenda Item Report Agenda Item No. COV-443-2020 Submitted by: Lilia Hernandez Submitting Department: City Administration Meeting Date: December 15, 2020 SUBJECT Report on Services Agreement with Engineering Partners, Inc. Consultant Engineers for the Re-Design and Preparation of Plans for the Atlantic Bridge Widening Project Recommendation: Receive and file the report, as it is being provided for informational purposes only pursuant to Section 2.17.12(B)(3) of the Vernon Municipal Code. Background: On October 14, 2020 the Public Utilities Department (VPU) requested approval of a Services Agreement with Engineering Partners, Inc. (EPI) pursuant to VMC Section 2.17.12 (B)(2) for the re-design and preparation of plans for the relocation of power poles related to the rehabilitation of the Atlantic Blvd. Bridge (Bridge) over the Los Angeles River, as part of the State’s Atlantic Bridge Widening Project. Being a contract for professional services, the proposed contract with EPI was exempt from competitive bidding pursuant to Section 2.17.12(A)(10) of the VMC. VPU's request for approval of the agreement sought an exemption from Competitive Selection requirements as allowed by VMC Section 2.17.12 (B)(2). After careful review of the request and information provided by VPU, the City Administrator approved a Services Agreement with EPI pursuant to VMC Section 2.17.12 (B)(3) which provides the City Administrator the authority to approve contracts up to $100,000 which are found to be in the best interest of the City. The total cost of the three-year agreement with EPI would not exceed $77,360. The approval of the Services Agreement with EPI was found to be in the best interest of the City as EPI possesses the necessary degree of expertise required to complete the re-design and preparation of plans, as well as extensive knowledge and background specific to the Atlantic Bridge design. The bridge is being widened as part of a State Cal Trans project to improve regional transportation in the area. When the Atlantic Bridge Widening Project began in 2012, the City entered into a consulting services agreement with EPI for the design and preparation of plans for the relocation of power poles related to the rehabilitation of the Atlantic Bridge. Since then, EPI coordinated closely with the City’s civil bridge consultant, CNS Engineers. Although a preliminary design was completed in 2018, the plans were rejected by LADWP this year, as clearances to their right of way adjacent to the bridge were not met. A re-design of electric facilities would be required to avoid the LADWP right-of-way, however, the original agreement with EPI had since expired, necessitating a new agreement. The new contract with EPI allows the company to complete the necessary re-design work and was the timeliest and most cost-efficient option for the City as EPI has access to pertinent details of the project and is already familiar with the existing Bridge design. The selection of a different firm would have resulted in significant delays and increased costs as any other firm would likely perform their own research, analysis, and design work from scratch. As with all agreements entered into by the City, the agreement with EPI was reviewed and approved as to form by the City Attorney’s office. Fiscal Impact: The fiscal impact associated with the Services Agreement with EPI is not to exceed $77,360 over the three-year term of the agreement. These costs will be eligible for reimbursement by Cal Trans at the conclusion of the project. Attachments: City Council Agenda Item Report Agenda Item No. COV-416-2020 Submitted by: Margarita Beltran Submitting Department: Public Works Meeting Date: December 15, 2020 SUBJECT Americans with Disabilities (ADA), Title II, Self-Evaluation and Transition Plan Recommendation: Adopt Resolution No. 2020-43 adopting the 2020 City of Vernon Americans with Disabilities (ADA) Act, Title II, Self-Evaluation and Transition Plan. Background: The Americans with Disabilities Act (ADA), enacted by the Federal Government in 1990, requires that each public agency evaluate its services, policies, and practices to determine whether they are accessible by those with disabilities. Each public agency is required to adopt a transition plan that documents current conditions and outlines planned future accessibility improvements. In order to comply with The Americans with Disabilities Act (ADA) Title II requirements, in 2019, the City of Vernon approved the Services Agreement with Sally Swanson Architects, Inc. to prepare a Citywide Accessibility Evaluation and Transition Plan. The Citywide ADA Self-Evaluation and Transition Plan is intended not to only to comply with federal and state laws with regards to access and disability, but also seeks to be a representation of accessibility and reasonable accommodations best practices. As the title suggests, this plan is organized in two separate reports; The ADA Self-Evaluation Report and the Transition Plan. These reports and supporting documents were prepared by the City’s consultant, Sally Swanson Architects, Inc., with input from the public and City of Vernon staff. The ADA Self-Evaluation identifies current City policies, procedures, and practices as they pertain to its programs, services and activities; and make the necessary modifications or recommendations to those policies and practices that do not meet the programmatic requirements of Title II of the ADA. This report is organized in two sections: 1.Findings and recommendations for City-wide implementation 2.Findings and recommendations on a Department by Department basis The Transition Plan evaluates the existing condition of City facilities and Public Rights-Of-Way and provides recommendations in order to meet ADA requirements. This Transition Plan report outlines the following: •Identifies physical obstacles in the public entity's facilities that limit the accessibility of its programs or activities to individuals with disabilities •Assesses the extent of architectural barriers to program accessibility in the public rights-of-way and within the buildings and other facilities operated by the City •Describes in detail the methods that will be used to make the facilities accessible •Estimates costs for mitigation solutions •Specifies the steps necessary to achieve compliance •Provides a schedule for barrier removal/mitigation •Sets priorities for barrier elimination •Indicates the Official responsible for implementation of the plan The purpose of this Citywide ADA Self-Evaluation and Transition Plan is to identify areas where changes are needed to ensure access is in place for people with disabilities. Fiscal Impact: Adoption of the City of Vernon's ADA, Title II, Self-Evaluation and Transition Plan has no fiscal impact. The mitigation of physical barriers will be budgeted in future fiscal years. Attachments: 1. Resolution 2020-43 2. City of Vernon ADA Self-Evaluation Report 3. City of Vernon ADA Transition Plan 4. ADA Presentation to City Council RESOLUTION NO. 2020-43 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON ADOPTING THE 2020 CITY OF VERNON AMERICANS WITH DISABILITIES ACT, TITLE II, SELF-EVALUATION AND TRANSITION PLAN SECTION 1. Recitals. A.The City of Vernon is committed to providing programs, services and activities in a nondiscriminatory manner for individuals with disabilities. B. Title II of the Americans with Disabilities Act (ADA), enacted by the Federal Government in 1990, requires that each public agency conduct a self-evaluation of its services, policies, and practices to determine whether they provide programmatic and physical accessibility to those with disabilities, and to develop a Transition Plan to guide reasonably necessary modifications to the City’s policies, practices, or procedures. C.On August 20, 2019, the City Council of the City of Vernon approved and authorized the execution of a services agreement with Sally Swanson Architects, Inc., to prepare a Citywide ADA Self-Evaluation and Transition Plan, in order to comply with the ADA Title II requirements. D.The Director of Public Works has recommended the adoption of the 2020 City of Vernon Americans with Disabilities Act, Title II, Self-Evaluation and Transition Plan. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 2. The City Council of the City of Vernon hereby finds and determines that the above recitals are true and correct. SECTION 3. The City Council hereby adopts the 2020 City of Vernon Americans with Disabilities Act, Title II, Self-Evaluation and Transition Plan which has been presented to the City Council concurrently with this resolution. / / / / / / / / / / / / / / / Resolution No. 2020-43 Page 2 of 2 _______________________ SECTION 4.The City Clerk shall certify the passage and adoption of this resolution and enter it into the book of original resolutions. APPROVED AND ADOPTED this 15 th day of December, 2020. ______________________ LETICIA LOPEZ, Mayor ATTEST: LISA POPE, City Clerk (seal) APPROVED AS TO FORM: _________________________________ ARNOLD M. ALVAREZ-GLASMAN, Interim City Attorney The Americans with Disabilities Act Self-Evaluation Report for the City of Vernon Report Prepared by: Sally Swanson Architects, Inc. 500 Sansome Street, Suite 410 San Francisco, CA 94111 Ian Blakey, Project Manager Joshua Klipp, ADA Policy Consultant Table of Contents City of Vernon 1 Table of Contents 2 I. PROJECT OVERVIEW 4 A. Acknowledgments 4 B. Introduction 4 C. Background Information Regarding the Americans with Disabilities Act and California State Law 5 1. Purpose of the Americans with Disabilities Act 5 2. Overview of Disability Civil Rights Laws Impacting the City 5 3. ADA Self-Evaluation Requirements 6 4. Who is a Qualified Person with a Disability? 6 D. Scope of the Self-Evaluation 7 E. Self-Evaluation Method of Review 8 F. ADA Transition Plan Requirements 8 G. How This Report is Organized & To Be Utilized 9 II. SURVEY RESPONSES AND RECOMMENDATIONS 10 Printed Communications 10 Communication with People Who Are Deaf or Hard of Hearing 11 Software and Digital Communication 12 Staff & Employees 13 Americans with Disabilities Act 15 Purchasing, Contracts, Vendors 18 General Purchases 20 Construction & Remodels 20 Facilities & Real Estate Management 21 Planning, Construction & Buildings 21 Fleet Services 22 Public Meetings 23 Emergency Procedures 27 Records 28 General 28 1 Department-Specific Accessibility Survey Responses 31 Police 31 Information Technology 32 Requested Trainings 33 Vetting of Self-Evaluation Results 33 Staff Who Contributed to this ADA Self-Evaluation 34 Work Plan for the Self-Evaluation Implementation 35 APPENDICES 39 Appendix A 39 Appendix B 40 Appendix C 41 Appendix D 51 Appendix E 53 Appendix F 54 Appendix G 55 Appendix H 58 Appendix I - Surveys 59 Finance Treasury 59 Fire 72 Health 87 HR 102 IT 119 Police 132 Public Utilities 148 Public Works 164 Appendix J 181 Appendix K 182 2 I. PROJECT OVERVIEW A. Acknowledgments Sally Swanson Architects, Inc., (SSA), would like to thank all the Departmental Survey Respondents, and especially Margarita Beltran, the City’s Project Manager for this Self-Evaluation, and Assistant Engineer with the Public Works Department. Without Ms. Beltran’s coordination and the individual Departmental contribution, this project would not have been possible. B. Introduction The City of Vernon is an industrial city of 5.2 square miles located several miles to the southeast of Downtown Los Angeles in Southern California. Founded in 1905 as the first exclusively industrial city in the Southwestern United States, Vernon currently houses more than 1,800 businesses that employ approximately 50,000 people, serving as a vital economic engine in the region. The Americans with Disabilities Act (ADA) Title II mandates that covered entities, such as the City of Vernon, conduct a Self-Evaluation, create a Transition Plan, appoint an ADA Coordinator, and develop a Grievance Procedure and an ADA Notice of Compliance. To meet this obligation, and to create a path forward toward total accessibility, the City has contracted with Sally Swanson Architects, Inc. (SSA) to assist with meeting (ADA) Title II mandates. 3 This document presents only the ADA Self-Evaluation. This evaluation provides a comprehensive report outlining a review of the City’s programs, services and activities. Results of the survey and analysis identify programmatic and administrative barriers to programs and are contained herein. C. Background Information Regarding the Americans with Disabilities Act and California State Law 1. Purpose of the Americans with Disabilities Act Passed in 1990, the Americans with Disabilities Act (ADA) is one of the most comprehensive civil rights laws in the nation. It provides protection to an estimated 57 million Americans in: employment (Title I); receipt of programs, services and activities from State and local government (Title II); the receipt of goods and services from private businesses (Title III); and telecommunications (Title IV). In 2008, the Americans with Disabilities Amendment Act (ADAAA) was passed. The ADAAA gives guidance to the courts regarding who has standing under ADA. The result has been an increasing number of people who are now able to bring ADA claims in Federal Court. 2. Overview of Disability Civil Rights Laws Impacting the City The City of Vernon is covered by the ADA Title II, ADAAA of 2008, the Rehabilitation Act of 1973, and California Government Codes 11135 and 12926. All contractual activities are also covered by California Government Code 4450. Employment programs are covered by the ADA (Title I), the ADAAA and California Government Code 12926. Construction activities are covered by California Code 4450. 4 When comparing State and Federal law 28 CFR 35.103, it is mandated that the most stringent law be applied to create the maximum amount of access for people with disabilities. Thus, the most stringent standards were applied to the evaluation reported in this document. 3. ADA Self-Evaluation Requirements Required by 28 CFR 35.105, the ADA Self-Evaluation is a complete examination of all programs, services and activities provided by the City, to ensure that, when viewed in their entirety, they are readily accessible to qualified people with disabilities. The purpose of the ADA Self-Evaluation is to identify areas where changes are needed to ensure access is in place for people with disabilities. 4. Who is a Qualified Person with a Disability? To be qualified as a person with disabilities for the purposes of this Self - Evaluation, an individual must have a disability as defined below and must be qualified to participate in the programs, services or activities of the City. Under California Government Code 11135, the ADA was incorporated into State law and therefore the ADA issues raised in this Report are both State and Federal issues. In California Government Code 12926, the definition of mental and physical disability was broadened beyond the ADAAA. Summarized as follows: 1. A person having a physical or mental disability that limits a major life activity. This person is considered as having unmitigated status (i.e., how the individual in question would function without the use of medication or devices that may mitigate the impact of the disability). If there is a limitation to a major life activity in this statute, coverage is established; 2. A person with a history of a disability as described above; 5 3. A person is regarded as having a disability, such as described. California State law also provides protection to cancer survivors, people who have a genetic predisposition to illnesses or disabilities or people who have received services within a special education program. D. Scope of the Self-Evaluation The Self-Evaluation is intended as a review of the programs, services and activities provided by the City. The US Department of Justice (DOJ) within the ADA Title II, Technical Assistance Manual (TAM) (Section II-8.2000) recommends a scope of review for Self-Evaluations, which contains thirteen program areas which were considered for use in the development of this report. Areas considered include: ● The Transition Plan (physical access to certain City facilities), ● Policies that may limit or exclude the participation of people with disabilities; ● Communication systems used by the City; ● Provision of auxiliary aids and services to people who are engaged in the City’s programs, services or activities; ● Access to emergency management for people with disabilities; ● Disability awareness among City staff; ● Policies addressing policy modification requests and the determination of fundamental alteration of programs; ● Access to public meetings; ● Human Resources programs and policies; ● Construction policies; ● City staff training and support; ● ADA-related drug policies. 6 E. Self-Evaluation Method of Review The ADA mandates that a Self-Evaluation review all programs, services and activities of the covered entity. The Self-Evaluation of the City’s programs, services, and activities required and involved the participation of every City Department. In conjunction with the City’s internal Project Manager and Public Works Department, SSA developed targeted accessibility surveys. Each Department was assigned relevant surveys based on their programs, services and activities. Departments were instructed to complete a survey for different divisions if they were sufficiently separate and unique. Copies of the surveys are included in the Appendix to this report, and survey responses and corresponding attachments are available upon request. F. ADA Transition Plan Requirements The ADA Transition Plan is required by 28 CFR 35.150 (d). An ADA Transition Plan must include the following components: 1. A list of all physical barriers in sites at which the City provides programs, services or activities; 2. A statement regarding the method to be used to mitigate the barriers; 3. A schedule for barrier mitigation; 4. The name of the official who is responsible for the ADA Transition Plan administration. The ADA Transition Plan will be contained in a separate report. 7 G. How This Report is Organized & To Be Utilized The City of Vernon is committed not only to compliance with federal and state laws regarding disability and access, but strives to be a model of accessibility and reasonable accommodations best practices. Accordingly, this Report is organized into two sections: (1) findings and recommendations for City-wide implementation; and (2) findings and recommendations on a Department by Department basis. Depending on survey responses, not all Department-specific sections will include recommendations. This Report is intended to be a summary – not full recitation – of survey results. Each section begins with an overview of recommendations indicated with square- shaped box bullet points, and segues into a breakdown of survey summaries providing the basis for those recommendations. Any recommendations provided by survey respondents will also be indicated with box bullet points. Other lists, such as lists of available accessibility resources, are generally indicated with round bullet points. By organizing it this way, the City can easily access the information it needs and use this Report to sharpen its focus on providing the best possible service to its constituents with disabilities, and become a model of best practices. 8 II. SURVEY RESPONSES AND RECOMMENDATIONS Printed Communications Recommendations ❏ Ensure that all City printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities. ❏ Ensure that all City printed publications use a uniform, accessible font, and are reviewed to ensure they do not portray people with disabilities in a demeaning or offensive way. ❏ Develop and implement staff training to ensure that all publications and correspondence use “person-first” language. Survey Responses & Findings More than half of the survey respondents indicated that readers are not informed that publications are available in alternative formats, if needed, for persons with disabilities. Of the remaining responses, respondents were either not sure, believed that some publications informed readers, or did not respond to the question. Additionally, more than half of survey respondents indicated that publications are not created using a specific font, and that publications are not reviewed to determine whether they portray persons with disabilities in a demeaning or offensive manner. Finally, two-thirds of respondents indicated that there has been no staff training to ensure that all publications and correspondence use “person first language”. 9 Communication with People Who Are Deaf or Hard of Hearing Recommendations ❏ Update business cards and letterhead to indicate “711 the California Relay” and check to ensure that phone lines are accessible to people who are Deaf or hard of hearing. ❏ Ensure that there is an identified local resource that can provide auxiliary aids fo r communication as needed. ❏ If videos are used (internally or for the public), ensure that all Departments are informed of resources available to make certain that videos are captioned. ❏ Review to determine if there is a policy in place for securing Video Re mote Interpreting (VRI) services and, if not, create this policy. ❏ For events utilizing a Public Information Officer (PIO), implement policy to ensure that Departments have an American Sign Language interpreter visible and within the screenshot if television cameras are in use, and that captioning services are used as a matter of course. ❏ Check with the Government Building Division to ensure that all Public Address systems are accessible to persons who are Deaf or hard of hearing. Survey Responses & Findings All survey respondents indicated that “711 the California Relay” is either not listed on business cards and letterheads (or they are not sure if it is). Respondents either did not know whether phone lines were accessible to people who are Deaf or hard of hearing, or were certain that phones lin es were not. Of all survey respondents, only Human Resources indicated that there is an identified local resource that can provide auxiliary aids for communication as needed. Of all survey respondents, only the Fire Department indicated that it uses captioned video for training. Another respondent indicated that captioning is handled by IT; and one other respondent indicated that any captioning would be handled by the City Administrator or the City Clerk. Regarding Video Remote Interpreting (VRI) services, respondents indicated that there is either no policy in place for securing these, or they were not sure if there was a 10 policy in place. For all respondents who indicate that their Department may utilize a Public Information Officer (PIO), all responses noted that they currently do not have an American Sign Language interpreter visible and within the screenshot if television cameras are in use, and / or captioning services are not used as a matter of course. With respect to captioning of videos in public spaces, survey responses indicated that these are not typically used. And finally, with regard to Public Address systems, only one response indicated this may be in use, but noted that it was maintained by the Government Building Division. Software and Digital Communication Recommendations ❏ Establish and implement policy that all websites and electronic communications comply with current Web Content Accessibility Guidelines (WCAG 2.1 AA). ❏ Establish how WCAG compliance will be maintained and communicate this expectation across Departments. ❏ Establish and implement policy that all electronic documents (e.g. PDFs, Word Documents and photographs) are accessible to people with disabilities and/or are available in alternative, accessible formats. Survey Responses & Findings All survey responses indicated either that Departmental websites either are not accessible to persons with disabilities1, or respondents were not sure if websites are accessible (including the response from Information Technology “IT”). Five respondents indicated that their Departments utilize web-based forms either internally or for the public. Of these respondents, there was no clarity on whether forms are evaluated for 1 See Web Content Accessibility Guidelines (WCAG), e.g. https://www.w3.org/WAI/standards -guidelines/wcag/ 11 accessibility, although some Departments indicated that this would be wit hin IT’s purview. IT did not respond to this question. Two Departments indicated that they use internally-developed software either internally or externally, and two indicated that they were not sure if they did or not. One Department indicated that IT man aged software, and IT did not indicate how it would ensure that this software would be accessible to persons with disabilities. Most survey respondents indicated that their Department utilizes third party software, but indicated that either IT or the vendor was responsible for determining its accessibility to persons with disabilities. With regard to touch screen information systems for the public, only one respondent indicated they were not sure whether these were utilized, all other respondents indicated they do not use such systems (or did not respond to the question). If utilized, survey responses indicate that there are no independent operating systems for people with visual impairments. Two survey responses indicated that they offer some type of computer or digital device for use by the public, but were not sure whether these had software that ma de them accessible to persons with disabilities. No survey responses indicated that email communications ( internal or external), including attachments, are checked for accessibility. Generally, survey responses indicated a perception that IT is responsibl e for ensuring web and digital accessibility, but responses to the IT survey were not clear that this is IT’s responsibility. Staff & Employees Recommendations 12 ❏ Consider partnering with local disability rights groups and organizations to affirmatively notify and recruit persons with disabilities to available roles. ❏ Establish practices to ensure that all job listings are accessible. ❏ Ensure that all job listings contain a statement regarding non -discrimination against persons with disabilities. ❏ Consider implementing methods to offer Staff and Employees an opportunity to self-identify as a person with a disability. ❏ Create and implement a process to approve reasonable modifications (i.e. modifications used to create access). ❏ Ensure that all facilities managers have a resource to determine the accessibility of their facilities, and develop and implement regular processes for the ongoing evaluation of facility accessibility. ❏ Ensure that all Departments have an easily ascertainable policy against disability harassment, as well as a grievance system that offers assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance. ❏ Ensure that the City has a current and easily ascertainable policy regarding service and/or support animals for its employees (and the public). Survey Responses & Findings Of all Departments surveyed, only Public Works indicated that it affirmatively recruits persons with disabilities, and believed this was done through Human Resources (HR); all other survey respondents either indicated “No” or “Not Sure”, including HR. Of all Departments surveyed, only HR indicated that it’s job listings were accessible to persons with disabilities, though it did not indicate how this was done; all other survey respondents indicated “No” or “Not Sure” as to whether job listings were accessible. At least one Department noted that job listings are managed by Human Resources. The majority of survey responses indicated that all job listings contain a statement regarding non-discrimination against persons with disabilities. Human Resources indicated that this statement reads, specifically, “The City of Vernon is an 13 equal opportunity employer.”2 Almost all survey responses indicated that a candidate for employment has the opportunity to request a reasonable accommodation for a disability. A quick review of the City of Vernon’s website contained the following information: Americans with Disabilities Act All applicants requiring reasonable accommodation throughout the application, testing and selection process due to a qualified disability must notify the Personnel Department in advance at (323) 583-8811 ext. 323. Most survey respondents indicated they were not sure whether interview panel members are trained regarding disability awareness and appropriate interactions with people with disabilities, but HR indicated this is “Done as part of interview panel briefing as part of general non-discrimination.” Nearly all survey responses stated that decisions to hire are based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations (one response indicated “N/A” and one indicated “Not Sure”). With respect to how the essential functions of a position are determined, most survey responses indicated this is done via an analysis of the positions requirements and functions3, and that job descriptions and listings are managed by HR. With regard to whether Departments offer Staff and Employees an opportunity to self -identify as a person with a disability, responses were evenly split between “Yes” and “Not Sure”. 2 The City of Vernon’s website also contains the following statement, “The City of Vernon is an Equal Employment Opportunity employer and does not discriminate on the basis of race, national origin, color, sex, religion, ancestry, age, medical condition or physical disability, veteran status, or sexual orientation in employment or the provision of services.” See http://www.cityofvernon.org/departments/human- resources. 3 Including the “Police Officer Standards and Training” also known as (POST). 14 By and large, survey responses indicated the accessibility of employee events such as holiday parties is the responsibility of HR. HR indicated that all employee events were held at accessible locations. Additionally, all survey responses indicated that all opportunities for advancement and education a re available and accessible to Staff and Employees who may have a disability.4 Except for one response that indicated “N/A”, all survey responses confirmed that there is a process for its staff and/or employees to request a reasonable accommodation. Most responses referred this to HR, and HR provided a link to the current procedures for requesting a reasonable accommodation for a disability.5 With the exception of HR, most survey responses indicated “Not Sure” as to whether the Department’s reasonable accommodation process includes a search for transfer into a vacant, funded role as an accommodation of last resort. A review of the Reasonable Accommodations policy provided by HR, however, (and linked below), includes the following language in relevant part: “Typical accommodations include . . . reallocating non-essential job duties, altering work schedules, reassignment to a vacant position” [Emphasis added].6 Half of survey respondents were not sure whether reasonable modifications, used to create access, were approved prior to being put in place. Several respondents believed this was the responsibility of Human Resources, but HR was not sure whether reasonable access was so approved. The Police Department indicated that this would 4 Except for IT, which indicated “N/A”. 5 See, http://www.cityofvernon.org/images/hr/personnel-policies- procedures/Reasonable_Accommodation_for_Disabled_Applicants__Employees.pdf 6 See footnote 5, supra. 15 be done by the Captain or Division Commander, and the Fire Department indicated it would be done by the Department Head. With regard to accessible facilities, three respondents indicated that their facilities are accessible at all times; three were not sure; two indicated “N/A ” - HR and Public Utilities (who indicated that this would be done by Public Works). The Police Department noticed that accessibility of its facilities was the responsibility of Maintenance and Facilities. Three survey respondents indicated they were not sure if their Department had a policy against disability harassment. Four of eight responses were not sure if their Department’s grievance system offers assistance to people with disabilities who, due to their disability, are not able to independently comp lete the grievance. Nearly all survey responses indicated their Department had not received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of their offices. The one exception to this was HR, who indicated they had at some point received one informal complaint from an employee who believed a reasonable accommodation should have been provided. With the exception of Public Works, all survey respondents indicated that their Departments do not supervise maintenance staff. Public Works noted that maintenance staff they supervise receive training on how to maintain an accessible environment. Finally, all survey responses indicated either “No”, “Not Sure” or “N/A” when asked whether their Department has a policy regarding service and/or support animals for its employees. 16 Purchasing, Contracts, Vendors Recommendations ❏ Create and implement City policy to ensure that accessibility is considered when purchasing new equipment. ❏ Ensure that documents related to bidding and contracting are uniformly (i.e. across Departments) accessible and available in alternative formats. ❏ Ensure that meetings related to bidding and contracting are uniformly (i.e. across Departments) held in accessible locations. ❏ Ensure that contractual language is uniformly (i.e. across Departments) in place holding contractors and vendors to applicable State and Federal disability civil rights mandates. ❏ Create and implement City policy to ensure that all products and services offered by third parties and vendors are fully accessible. ❏ Create and implement City policy to ensure that accessibility plan checks are performed when vendors conduct tenant improvements in public service areas. ❏ Develop and offer guidance for staff and vendors regarding clear space and furniture placement. ❏ Inform all Departments as to what steps an employee or member of the public with a disability has available if they believe they have been discriminated against by a County vendor or contractor. Survey Responses & Findings All survey respondents indicated that, when the purchase of new equipment is made, ( including, but not limited to, communication and transportation equipment) they are either not sure or it is not reviewed to ensure that it is accessible to users with disabilities. With regard to the accessibility of documents related to bidding and contracting, only the Police and Fire Departments indicated these were accessible and/or available in alternative formats; remaining respondents indicated they were not sure, or that accessibility of these materials was not consistent. With regard to the accessibility of meetings related to bidding and contracting, only Public Works indicated 17 that these were always held in accessible locations, the remaining respondents were not sure. In response to the question as to whether all City contracts have language in place holding contractors and vendors to applicable State and Federal disability civil rights mandates, three responses indicated yes, three indicated “Not Sure” and one response indicated not consistently.7 With regard to how City Departments ensure that all products and services offered by third parties and vendors are fully accessible, a range of responses were offered, e.g. that: this is enforced by contract; accommodations would be made as needed; or that this is not applicable since these products and services would apply internally to IT only. Most survey respondents were not sure whether accessibility plan checks are performed when vendors conduct tenant improvements in public service areas; and only one response affirmatively indicated that guidance is in place for staff and vendors regarding clear space and furniture placement. With regard to what steps an employee or member of the public with a disability who believes they have been discriminated against by a County vendor or contractor has available, survey responses varied: internal complaints to HR/public response to website; City Attorney or City Clerk or HR; or no responses (from HR or Health). 7 One response indicated that the City’s standard contracts all carry the following language, "Contractor certifies and represents that, during the performance of this Contract, it and any other parties with whom it may subcontract shall adhere to equal employment opportunity practices to assure that applicants, employees and recipients of service are treated equally and are not discriminated against because of their race, religion, color, national origin, ancestry, disability, sex, age, medical condition, s exual orientation or marital status. Contractor further certifies that it will not maintain any segregated facilities. Contractor further agrees to comply with The Equal Employment Opportunity Practices provisions as set forth in Exhibit “E”." 18 General Purchases Recommendations ❏ Establish a uniform process for ensuring accessibility of items - including furniture and items with operational parts - purchased for installation. Survey Responses & Findings With regard to checks in place for items purchased for installation, two survey responses indicated this would be the responsibility of the Maintenance Department, and one survey indicated this would be done according to applicable building codes. One survey indicated that items purchased by Departments are not for general use, and would not need to be used by persons with disabilities. With regard to purchasing items that contain operational parts, one Department indicated that it considered accessibility when purchasing; remaining responses indicated either “Not Sure” or that items purchased “are typically not subject for use by disabled persons.” Finally, with respect to the accessibility of purchased furniture, two survey responses affirmatively stated that this is a consideration, and remaining responses indicated either that it is not, or that they were not sure. Construction & Remodels Recommendations ❏ Establish a uniform process to ensure that design contracts hold design professionals to designs that use, at a minimum, the most stringent access standards in effect at the time of the project. ❏ Review to see whether processes to ensure that persons with disabilities are engaged by the City on major construction projects exist and, if not, develop and implement these protocols. 19 Survey Responses & Findings Survey responses were evenly split on whether design contracts hold design professionals to designs that use, at a minimum, the most stringent access standards in effect at the time of the project; or whether design professionals are encouraged to exceed minimum requirements. Survey responses were also split on whether persons with disabilities are engaged by the City on major construction projects, with one response indicating this engagement was performed by Publ ic Works. Facilities & Real Estate Management Recommendations ❏ Review to determine whether there is a policy ensuring proper maintenance of accessible features and, if not, establish and implement such a policy. Survey Responses & Findings Public Works indicated that it oversees the accessibility of public rights of way, and that it: “ensures that any new improvements to all public right of way are following the latest accessibility requirements. Plan review and inspections are performed to certify that all requirements are followed. Maintenance is performed on a regular basis and public/employee accessibility concerns are evaluated per request.” Public Works maintains an accessibility checklist and performs inspections, though it is not clear whether there is a policy ensuring proper maintenance of accessible features. Planning, Construction & Buildings 20 Recommendations ❏ Review the City’s website to make sure that any complaint or grievance process is readily ascertainable and accessible. Survey Responses & Findings Public Works indicated that it “evaluates reviews and provides comments to applicants to ensure the latest accessibility requirements are implemented in (construction) plans.” Additionally, “Inspection is performed during all phases of construction and on a regular basis to certify that construction is being performed per approved plans and per accessibility requirements.” Any complaints regarding a lack of accessibility during construction may be submitted through the City’s website.8 Survey responses either were unsure whether the City has staff or employees who evaluate accessibility of built environments for persons with disabilities, or affirmatively indicated that the City does not. With regard to Capital projects, Public Works indicated that it does not consistently use an accessibility checklist. Fleet Services Recommendations ❏ Review any fleet services (not including the Police Department) to determine whether such services are accessible, or can be made accessible, upon request for a reasonable accommodation. Survey Responses & Findings Approximately half of survey respondents indicated that they provide some sort of Fleet Services. The Police Department indicated that accessibility of these services - 8 A quick review of the City’s website did not make clear where complaints are to be submitted. 21 primarily the transport of prisoners - is achieved via State contractual requirements, and that Service Animals are allowed on transportation. Public Works indicates that, with respect to accessibility, it follows HR measures, but it was unsure whether Service Animals are permitted. Public Utilities stated that transportation services are for employees only. Public Meetings Recommendations ❏ Create and implement an events accessibility checklist for all Departments that hold public meetings which addresses, at a minimum, the items included within this portion of the Self-Evaluation survey. Survey Responses & Findings Five Departments indicated that they hold public meetings. Of these Departments, three indicated that they do not have a checklist with regard to events accessibility, and two Departments were not sure. Four Departments indicated that they were not sure if, when security checks are required to attend any public function, security personnel trained in best practices for conducting security checks for persons with disabilities. With regard to whether all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities, one survey response indicated “Yes”, two indicated “No”, and two were not sure. Two of five survey responses indicated that persons who administer public meetings are not trained in how 22 to respond to requests for reasonable accommodations by members of the public, and three responses indicated they were not sure if this was done. All responding Department surveys indicated that steps are taken to ensure that all meetings are held in buildings and rooms that are fully accessible. The Fire and Police Department noted this was done by holding public meetings in Council Chambers. Only Public Works indicated that staff is trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals. Two other survey respondents either indicated staff was not trained in this way, or they were not sure. All responding Departments indicated that indoor or outdoor surfaces where persons with disabilities will travel (for events) are smooth, stable and slip resistant, except for Human Resources, which indicated they were not sure. Three responding Departments indicated that all public meetings are held on sites that are accessible by public transportation, except for Human Resources and Public Utilities, which were not sure. Almost all survey respondents indicated that they were unsure whether public meeting notices contain language indicating that service animals are welcome. Almost all survey respondents indicated that they were not sure whether service animal relief areas identified before every public meeting. All responses indicated either “No”, “Not Sure” or “Not consistently” when asked whether emergency exits were identified before every public meeting. On the question of whether stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible, survey results were as follows: 23 On the question of whether all public meetings have reserved seating for people who use wheelchairs, results were as follows: All surveys indicating “Yes” also noted that this reserved seating also includes integrated companion seating. Four of five survey respondents indicated that they were not sure whether presenters at public meetings trained are on best practices for presenting content to persons with disabilities, and the remaining respondent indicated this was not done. With regard to whether FM loop systems are available for persons who are deaf or hard of hearing, survey results were as follows: 24 Four of five survey respondents indicated that they were not sure whether sign language interpreters and/or real-time captioners were available for all public meetings, and one response indicated that they are not. With regard to the question of what processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment, the responses were that would be handled by: Human Resources, the City Clerk, City Admin Office, or the respondent was unsure or answered “N/A”. With regard to the question as to whether any public events utilize security measures (e.g. magnometers, wands, bag checks), survey responses indicated either “No” or “Not Sure” and were additionally not sure whether any security personnel were trained in best practices for conducting security checks of persons with disabilities. Two survey respondents, including HR, indicated that they were unsure what processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible. The remaining respondents indicated that this would be the responsibility of HR or the City Clerk. 25 Emergency Procedures Recommendations ❏ Ensure that all Departments have procedures in place regarding the evacuation of persons with disabilities. ❏ Communicate with emergency partners to ensure that any evacuation facilities are accessible to persons with disabilities. Survey Responses & Findings Of the five survey responses, four indicated “Not Sure” and one indicated “Yes” to the question of whether their Department has procedures in place regarding the evacuation of persons with disabilities. Four of five survey respondents indicated that they do not utilize Department vehicles for transporting civilians in any instance, including emergency evacuation incidents. Only one Department, the Police Department, indicated that it does utilize vehicles in this way, that these vehicles are not wheelchair accessible, and that they would accommodate any requests from persons with disabilities. Two survey respondents - the Fire Department and the Police Department - work in partnership with other entities regarding the set up and administration of evacuation shelters or centers. The Police Department survey response, indicated that those partnerships would, “Depends on the circumstances. We could work with Red Cross or transportation agencies in the event the Emergency Operation Center is activated. The is also the local Bell Shelter. The Fire Department noted that “If and when required, (we would) coordinate shelter operations with local emergency support personnel.” 26 Records Recommendations ❏ Develop and implement protocols to ensure the uniform accessibility of City records to persons with disabilities. Survey Responses & Findings Responding Departments indicated that records are kept both digitally and in hard copies. With regard to how City Departments ensure that digital records are fully accessible to persons with disabilities, survey responses noted that this was done, essentially, in two ways: (1) via digital or Laserfiche access; or (2) upon reasonable accommodation request. One response indicated there was no process for providing access to records. With regard to how Departments offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents, one survey response indicated this was not done; remaining survey responses indicated accommodations could be made on request, or would be referred to the City Clerk. General Recommendations ❏ Ensure that all Departments have ADA Notices of Compliance posted. ❏ Ensure that all Departments have policies regarding service and/or emotional support animals for its employees and/or the public. ❏ Ensure that all electronic informational kiosks are accessible to persons with disabilities. 27 ❏ Ensure that all Departments that offer printed informational brochures to the public, and all Departments that issue any sort of fine or citation, have those available in large print format, and are able to provide alternative formats upon request. ❏ Ensure that IT is trained and able to determine whether any automation initiatives (e.g. web and mobile applications) that interface with the public, meet current digital accessibility guidelines. ❏ Ensure that all Departments have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program. Survey Responses & Findings Three survey respondents stated that their Departments have ADA Notices of Compliance posted, and specifically in: employee common areas, a break room, and in records. The remaining respondents either indicated that notices were not posted, or did not provide a response. With regard to whether Departments have any policies regarding service and/or emotional support animals for its employees and/or the public, the Police Department responded affirmatively, and all remaining responses indicated either “No”, “N/A” or no response was provided. Of all respondents, only the Fire Department indicated that it offers transportation services, specifically 911 EMS. Of all respondents, only IT indicated that it has electronic informational kiosks, and was not sure whether these were accessible. Six survey responses stated that they offer printed informational brochures to the public. Of these responses, Departments indicated that that these materials are: offered in large print format upon request; or are not available in large print format. Four survey respondents indicated that their Department issues warnings, penalties and/or citations. Access to the information included on these documents is achieved: on a case by case basis; by being read out loud, including saving the 28 document or recording the recording on a thumb drive or leaving the information on a voice message; mailed, or hand delivered; or sent in the same manner as regular invoices (i.e. it is not provided in an additional format). Two survey responses stat ed that they are currently involved in automation initiatives (e.g. web and mobile applications) that interface with the public, and that whether these were accessible is either unsure or managed by IT. Five survey responses noted that, while they are not currently involved in automation initiatives, they may be in the future and believed that accessibility would be managed either by HR or IT. With regard to how City Departments receive complaints of lack of accessibility or requests for reasonable accommodation from the public, responses were: ● Any complaints can be provided verbally, in writing, or on the phone. ● If/when it may occur, most likely via phone call. ● Complaints can be received verbally, electronically, or in writing. ● It would be reported to a supervisor or HR. ● Online through (the) city's website and phone. Six survey responses indicated that no complaints regarding accessibility have been received, and one was unsure. Five survey responses, including HR, indicated that their Department does not have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program, and one Department was unsure. One survey response, the Police Department, indicated that it did have this policy, which would be maintained by HR. All responding surveys indicated that, based on Self-Evaluation questions, there are areas where training of Department staff would be beneficial. 29 Department-Specific Accessibility Survey Responses The following section addresses survey responses, not already addressed, on a Department-by-Department basis. Police Recommendations ❏ With regard to animals of persons involved in arrests, update all policies - including service and emotional support animal policies - to ensure that any animals who may be temporarily sent to Animal Care and Control or any animal shelter are not to be inadvertently euthanized. Survey Responses & Findings Police Department survey responses indicated that first responders have been trained regarding State and Federal disability civil rights mandates. Additionally, holding, booking and visitor areas have been reviewed for access. Further, where inmate phone systems are provided, there is a phone system for inmates who are deaf or hard of hearing. With regard to how service animals are dealt with in arrests, the Police Department stated that “It depends if the animal is required because of the disability. If the animal exhibits vicious behavior or poses a direct threat to the health of others, or reasonably disrupts or interferes with normal business operations, an officer may direct the handler to remove the animal from the premise.” With regard to how medical appliances are managed during arrests, the Department stated, “With reasonable accommodations. Arrests with medical related concerns are sent to a nearby medical facility for a pre-booking. The doctor will document the medical needs and the needs will 30 be accommodated in accordance with our jail housing facility's policy (either the Huntington Park Jail or the Los Angeles Sheriff's Dept). Generally cases like this will be released OR (on their own recognizance).” With regard to how medication needs are managed in the event of arrest, the Department stated, “The person is taken for a pre-booking and the Doctor will prescribe the medication. All persons arrested with medical needs get transported to the county jail, wherein their staffing nurses generally handle their medication intake.” And with regard to how Miranda rights may be communicated to persons who are deaf or hard of hearing, the Department stated, “TTY or we ask for assistance from personnel at the Holy Angels Church of the Deaf, in Vernon.” According to survey responses, 911 systems are tested for compatibility with 911, and there is a procedure in place for officers to obtain a sign language interpreter when one is needed on an emergency basis. Information Technology Recommendations ❏ Develop and implement regular training on current Web Content Accessibility Guidelines (WCAG). ❏ Assist City Departments with regular web and digital accessibility testing to ensure the accessibility of websites, software, mobile applications, forms - essentially all digital platforms and interfaces - that may be utilized by employees and/or the public. Survey Responses & Findings Survey responses indicate that, in response to the question as to how IT ensures that all Information & Communication Technology services within its purview, and 31 mobile applications, are fully accessible, currently it does not. Additionally the Department does not offer and/or receive regular training regarding digital and web accessibility. Requested Trainings Survey respondents indicated that they would find regular trainings regarding disability issues to be helpful. Vetting of Self-Evaluation Results The City of Vernon is committed to the vetting of these results with stakeholders as required by law and developing an implementation plan designed to implement necessary changes and track good-faith compliance efforts. Vetting Activity Report Concerning the Self-Evaluation Vetting ● Date(s) and location(s) of vetting ● List of attendees Input Received During Vetting 32 Response to Input during Vetting: Persons Involved in Vetting: Use of This Self-Evaluation as a Living Document The ADA requires that a Self-Evaluation be conducted once. Many entities, including the City of Vernon, recognize the value of using this document on an ongoing basis. As such, it's available to incorporate new policies as needed in response to emerging issues in case law, new regulations or the development of, and/or modification of the City’s programs. Thus, an addendum to this report can be added as needed to document the City’s good-faith effort to make the changes necessary to ensure appropriate access for the public, employees and visitors to the City of Vernon. Staff Who Contributed to this ADA Self-Evaluation The following list shows the departments that completed Self-Evaluation surveys originally sent to the points of contact below. Some of these departments, however, completed the surveys as part of a group effort where other staff members within their department provided input and contributed to the survey’s completion. Department Point of Contact Public Works Director of Public Works Finance/Treasury Director of Finance Fire Department Interim Fire Chief Health Health Director Human Resources Director of Human Resources 33 Public Utilities Interim General Manager of VPU Police Department Chief of Police Information Technology Information Technology Manager Work Plan for the Self-Evaluation Implementation The following is the City of Vernon’s ADA Self-Evaluation work plan. It is contained in a spreadsheet designed to be modified as progress is made. It may also be modified when work is necessary that is not identified within the body of this Report. Such instances may occur pursuant to new regulations or case law developments. The first column will contain a series of recommendations that come from interaction with the City of Vernon officials. These are entitled "General Recommendations". The second column is "Action Taken by the City”. This column is designed to record whether the City has accepted the recommendation, modified or rejected it. If the recommendation is rejected or modified it would be advisable to record the rationale for this action in the "notes" section, which is the seventh column to the right. Columns titled "Staff Assigned," “Due Dates,” "Reviewed by,” and “Date ” are designed to record progress in the implementation of the ADA Self-Evaluation. Many of the recommendations are clustered by subject and can be addressed with one staff assignment. Occasionally, there will be one recommended action that addresses a number of issues noted within the report. For example, disability awareness training benefits the City’s operation in a number of areas which are noted by findings. The provision of the training, therefore, addresses a wide variety of issues. It is very important that the date on the work plan be updated each time an entry is made. 34 NO.SUBJECT MATTER RECOMMENDATION(S)DATE ASSIGNED ASSIGNEE(S)MILESTONE(S)DUE DATE TRAINING (Y/N)CITY OF VERNON NOTE(S) 1 Printed Communications Ensure that all City printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities. 2 Printed Communications Ensure that all City printed publications use a uniform, accessible font, and are reviewed to ensure they do not portray people with disabilities in a demeaning or offensive way. 3 Printed Communications Develop and implement staff training to ensure that all publications and correspondence use “person-first” language 4 Communication with People Who Are Deaf or Hard of Hearing Update business cards and letterhead to indicate “711 the California Relay” and check to ensure that phone lines are accessible to people who are Deaf or hard of hearing. 5 Communication with People Who Are Deaf or Hard of Hearing Ensure that there is an identified local resource that can provide auxiliary aids for communication as needed. 6 Communication with People Who Are Deaf or Hard of Hearing If videos are used (internally or for the public), ensure that all Departments are informed of resources available to make certain that videos are captioned. 7 Communication with People Who Are Deaf or Hard of Hearing Review to determine if there is a policy in place for securing Video Remote Interpreting (VRI) services and, if not, create this policy. 8 Communication with People Who Are Deaf or Hard of Hearing For events utilizing a Public Information Officer (PIO), implement policy to ensure that Departments have an American Sign Language interpreter visible and within the screenshot if television cameras are in use, and that captioning services are used as a matter of course. 9 Communication with People Who Are Deaf or Hard of Hearing Check with the Government Building Division to ensure that all Public Address systems are accessible to persons who are Deaf or hard of hearing. 10 Software and Digital Communication Establish and implement policy that all websites and electronic communications comply with current Web Content Accessibility Guidelines (WCAG 2.1 AA). 11 Software and Digital Communication Establish how WCAG compliance will be maintained and communicate this expectation across Departments. 12 Software and Digital Communication Establish and implement policy that all electronic documents (e.g. PDFs, Word Documents and photographs) are accessible to people with disabilities and/or are available in alternative, accessible formats. City of Vernon - Self-Evaluation Work Plan 35 13 Staff & Employees Consider partnering with local disability rights groups and organizations to affirmatively notify and recruit persons with disabilities to available roles. 14 Staff & Employees Establish practices to ensure that all job listings are accessible. 15 Staff & Employees Ensure that all job listings contain a statement regarding non- discrimination against persons with disabilities. 16 Staff & Employees Consider implementing methods to offer Staff and Employees an opportunity to self-identify as a person with a disability. 17 Staff & Employees Create and implement a process to approve reasonable modifications (i.e. modifications used to create access). 18 Staff & Employees Ensure that all facilities managers have a resource to determine the accessibility of their facilities, and develop and implement regular processes for the ongoing evaluation of facility accessibility. 19 Staff & Employees Ensure that all Departments have an easily ascertainable policy against disability harassment, as well as a grievance system that offers assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance. 20 Staff & Employees Ensure that the City has a current and easily ascertainable policy regarding service and/or support animals for its employees (and the public). 21 Purchasing, Contracts, Vendors Create and implement City policy to ensure that accessibility is considered when purchasing new equipment. 22 Purchasing, Contracts, Vendors Ensure that documents related to bidding and contracting are uniformly (i.e. across Departments) accessible and available in alternative formats 23 Purchasing, Contracts, Vendors Ensure that meetings related to bidding and contracting are uniformly (i.e. across Departments) held in accessible locations. 24 Purchasing, Contracts, Vendors Ensure that contractual language is uniformly (i.e. across Departments) in place holding contractors and vendors to applicable State and Federal disability civil rights mandates. 25 Purchasing, Contracts, Vendors Create and implement City policy to ensure that all products and services offered by third parties and vendors are fully accessible. 26 Purchasing, Contracts, Vendors Create and implement City policy to ensure that accessibility plan checks are performed when vendors conduct tenant improvements in public service areas. 27 Purchasing, Contracts, Vendors Develop and offer guidance for staff and vendors regarding clear space and furniture placement. 28 Purchasing, Contracts, Vendors Inform all Departments as to what steps an employee or member of the public with a disability has available if they believe they have been discriminated against by a County vendor or contractor. 36 29 General Purchases Establish a uniform process for ensuring accessibility of items - including furniture and items with operational parts - purchased for installation. 30 Construction & Remodels Establish a uniform process to ensure that design contracts hold design professionals to designs that use, at a minimum, the most stringent access standards in effect at the time of the project. 31 Construction & Remodels Review to see whether processes to ensure that persons with disabilities are engaged by the City on major construction projects exist and, if not, develop and implement these protocols 32 Facilities & Real Estate Management Review to determine whether there is a policy ensuring proper maintenance of accessible features and, if not, establish and implement such a policy 33 Planning, Construction & Buildings Review the City’s website to make sure that any complaint or grievance process is readily ascertainable and accessible. 34 Fleet Services Review any fleet services (not including the Police Department) to determine whether such services are accessible, or can be made accessible, upon request for a reasonable accommodation. 35 Public Meetings Create and implement an events accessibility checklist for all Departments that hold public meetings which addresses, at a minimum, the items included within this portion of the Self- Evaluation survey. 36 Emergency Procedures Ensure that all Departments have procedures in place regarding the evacuation of persons with disabilities. 37 Emergency Procedures Communicate with emergency partners to ensure that any evacuation facilities are accessible to persons with disabilities. 38 Records Develop and implement protocols to ensure the uniform accessibility of City records to persons with disabilities. 39 General Ensure that all Departments have ADA Notices of Compliance posted. 40 General Ensure that all Departments have policies regarding service and/or emotional support animals for its employees and/or the public. 41 General Ensure that all electronic informational kiosks are accessible to persons with disabilities. 42 General Ensure that all Departments that offer printed informational brochures to the public, and all Departments that issue any sort of fine or citation, have those available in large print format, and are able to provide alternative formats upon request. 43 General Ensure that IT is trained and able to determine whether any automation initiatives (e.g. web and mobile applications) that interface with the public, meet current digital accessibility guidelines. 44 General Ensure that all Departments have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program. 37 45 Police With regard to animals of persons involved in arrests, update all policies - including service and emotional support animal policies - to ensure that any animals who may be temporarily sent to Animal Care and Control or any animal shelter are not to be inadvertently euthanized. 46 Information Technology Develop and implement regular training on current Web Content Accessibility Guidelines (WCAG). 47 Information Technology Assist City Departments with regular web and digital accessibility testing to ensure the accessibility of websites, software, mobile applications, forms - essentially all digital platforms and interfaces - that may be utilized by employees and/or the public 38 APPENDICES Appendix A 28 CFR 35.105 Self-Evaluation. ● (a) A public entity shall, within one year of the effective date of this part, evaluate its current services, policies, and practices, and the effects thereof, that do not or may not meet the requirements of this part and, to the extent modification of any such services, policies, and practices is required, the public entity shall proceed to make the necessary modifications. ● (b) A public entity shall provide an opportunity to interested persons, including individuals with disabilities or organizations representing individuals with disabilities, to participate in the Self-Evaluation process by submitting comments. ● (c) A public entity that employs 50 or more persons shall, for at least three years following completion of the Self-Evaluation, maintain on file and make available for public inspection: o (1) A list of the interested persons consulted; o (2) A description of areas examined and any problems identified; and o (3) A description of any modifications made. ● (d) If a public entity has already complied with the Self-Evaluation requirement of a regulation implementing section 504 of the Rehabilitation Act of 1973, then the requirements of this section shall apply only to those policies and practices that were not included in the previous Self-Evaluation. 39 Appendix B California Government code section 11135 11135. (a) No person in the State of California shall, on the basis of race, national origin, ethnic group identification, religion, age, sex, sexual orientation, color, genetic information, or disability, be unlawfully denied full and equal access to the benefits of, or be unlawfully subjected to discrimination under, any program or activity that is conducted, operated, or administered by the state or by any state agency, is funded directly by the state, or receives any financial assistance from the state. Notwithstanding Section 11000, this section applies to the California State University. (b) With respect to discrimination on the basis of disability, programs and activities subject to subdivision (a) shall meet the protections and prohibitions contained in Section 202 of the federal Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12132), and the federal rules and regulations adopted in implementation thereof, except that if the laws of this state prescribe stronger protectio ns and prohibitions, the programs and activities subject to subdivision (a) shall be subject to the stronger protections and prohibitions. (c) (1) As used in this section, "disability" means any mental or physical disability, as defined in Section 12926. 40 Appendix C California Government Code Section 12926 Cal Gov Code § 12926 (2010) § 12926. Definitions regarding unlawful practices As used in this part in connection with unlawful practices, unless a different meaning clearly appears from the context: (a) "Affirmative relief" or "prospective relief" includes the authority to order reinstatement of an employee, awards of backpay, reimbursement of out-of-pocket expenses, hiring, transfers, reassignments, grants of tenure, promotions, cease and desist orders, posting of notices, training of personnel, testing, expunging of records, reporting of records, and any other similar relief that is intended to correct unlawful practices under this part. (b) "Age" refers to the chronological age of any ind ividual who has reached his or her 40th birthday. (c) "Employee" does not include any individual employed by his or her parents, spouse, or child, or any individual employed under a special license in a nonprofit sheltered workshop or rehabilitation facility. (d) "Employer" includes any person regularly employing five or more persons, or any person acting as an agent of an employer, directly or indirectly, the state or any political or civil subdivision of the state, and cities, except as follows: "Employer" does not include a religious association or corporation not organized for private profit. (e) "Employment agency" includes any person undertaking for compensation to procure employees or opportunities to work. (f) "Essential functions" means the fundamenta l job duties of the employment position the individual with a disability holds or desires. "Essential functions" does not include the marginal functions of the position. (1) A job function may be considered essential for any of several reasons, including, but not limited to, any one or more of the following: 41 (A) The function may be essential because the reason the position exists is to perform that function. (B) The function may be essential because of the limited number of employees available among whom the performance of that job function can be distributed. (C) The function may be highly specialized, so that the incumbent in the position is hired for his or her expertise or ability to perform the particular function. (2) Evidence of whether a particular function is essential includes, but is not limited to, the following: (A) The employer's judgment as to which functions are essential. (B) Written job descriptions prepared before advertising or interviewing applicants for the job. (C) The amount of time spent on the job performing the function. (D) The consequences of not requiring the incumbent to perform the function. (E) The terms of a collective bargaining agreement. (F) The work experiences of past incumbents in the job. (G) The current work experience of incumbents in similar jobs. (g) "Labor organization" includes any organization that exists and is constitut ed for the purpose, in whole or in part, of collective bargaining or of dealing with employers concerning grievances, terms or conditions of employment, or of other mutual aid or protection. (h) "Medical condition" means either of the following: (1) Any health impairment related to or associated with a diagnosis of cancer or a record or history of cancer. (2) Genetic characteristics. For purposes of this section, "genetic characteristics" means either of the following: (A) Any scientifically or medically identifiable gene or chromosome, or combination or alteration thereof, that is known to be a cause of a disease or disorder in a person or his or her offspring, or that is determined to be associated with a statistically increased risk of development of a disease or disorder, and that is presently not associated with any symptoms of any disease or disorder. 42 (B) Inherited characteristics that may derive from the individual or family member, that are known to be a cause of a disease or disorder in a person or his or her offspring, or that are determined to be associated with a statistically increased risk of development of a disease or disorder, and that are presently not associated with any symptoms of any disease or disorder. (i) "Mental disability" includes, but is not limited to, all of the following: (1) Having any mental or psychological disorder or condition, such as mental retardation, organic brain syndrome, emotional or mental illness, or specific learning disabilities, that limits a major life activity. For purposes of this section: (A) "Limits" shall be determined without regard to mitigating measures, such as medications, assistive devices, or reasonable accommodations, unless the mitigating measure itself limits a major life activity. (B) A mental or psychological disorder or condition limits a major life activity if it makes the achievement of the major life activity difficult. (C) "Major life activities" shall be broadly construed and shall include physical, mental, and social activities and working. (2) Any other mental or psychological disorder or condition not described in paragraph (1) that requires special education or related services. (3) Having a record or history of a mental or psychological disorder or condition described in paragraph (1) or (2), which is known to the employer or other entity covered by this part. (4) Being regarded or treated by the employer or other entity covered by this part as having, or having had, any mental condition that makes achievement of a major life activity difficult. (5) Being regarded or treated by the employer or other entity covered by this part as having, or having had, a mental or psychological disorder or condition that has no present disabling effect, but that may become a mental disability as described in paragraph (1) or (2). "Mental disability" does not include sexual behavior disorders, compulsive gambling, kleptomania, pyromania, or psychoactive substance use disorders resulting from the current unlawful use of controlled substances or other drugs. (j) "On the bases enumerated in this part" means or refers to discrimination on the basis of one or more of the following: race, religious creed, color, national origin, 43 ancestry, physical disability, mental disability, medical condition, marital status, sex, age, or sexual orientation. (k) "Physical disability" includes, but is not limited to, all of the following: (1) Having any physiological disease, disorder, condition, cosmetic disfigurement, or anatomical loss that does both of the following: (A) Affects one or more of the following body systems: neurological, immunological, musculoskeletal, special sense organs, respiratory, including speech organs, cardiovascular, reproductive, digestive, genitourinary, hemic and lymphatic, skin, and endocrine. (B) Limits a major life activity. For purposes of this section: (i) "Limits" shall be determined without regard to mitigating measures such as medications, assistive devices, prosthetics, or reasonable accommodations, unless the mitigating measure itself limits a major life activity. (ii) A physiological disease, disorder, condition, cosmetic disfigurement, or anatomical loss limits a major life activity if it makes the achievement of the major life activity difficult. (iii) "Major life activities" shall be broadly construed and includes physical, mental, and social activities and working. (2) Any other health impairment not described in paragraph (1) that requires special education or related services. (3) Having a record or history of a disease, disorder, condition, cosmetic disfigurement, anatomical loss, or health impairment described in paragraph (1) or (2), which is known to the employer or other entity covered by this part. (4) Being regarded or treated by the employer or other entity covered by this part as having, or having had, any physical condition that makes achievement of a major life activity difficult. (5) Being regarded or treated by the employer or other entity covered by this part as having, or having had, a disease, disorder, condition, cosmetic disfigurement, anatomical loss, or health impairment that has no present disabling effect but may become a physical disability as described in paragraph (1) or (2). (6) "Physical disability" does not include sexual behavior disorders, compulsive gambling, kleptomania, pyromania, or psychoactive substance use 44 disorders resulting from the current unlawful use of controlled substances or other drugs. (l) Notwithstanding subdivisions (i) and (k), if the definition of "disability" used in the Americans with Disabilities Act of 1990 (Public Law 101-336) would result in broader protection of the civil rights of individuals with a mental disability or physical disability, as defined in subdivision (i) or (k), or would include any medical condition not included within those definitions, then that broader protection or coverage shall be deemed incorporated by reference into, and shall prevail over conflicting provisions of, the definitions in subdivisions (i) and (k). (m) "Race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, marital status, sex, age, or sexual orientation" includes a perception that the person has any of those characteristics or that the person is associated with a person who has, or is perceived to have, any of those characteristics. (n) "Reasonable accommodation" may include either of the following: (1) Making existing facilities used by employees readily accessible to, and usable by, individuals with disabilities. (2) Job restructuring, part-time or modified work schedules, reassignment to a vacant position, acquisition or modification of equipment or devices, adjustment or modifications of examinations, training materials or policies, the provision of qualified readers or interpreters, and other similar accommodations for individuals with disabilities. (o) "Religious creed," "religion," "religious observance," "religious belief," and "creed" include all aspects of religious belief, observance, and practice. (p) "Sex" includes, but is not limited to, pregnancy, childbirth, or medical conditions related to pregnancy or childbirth. "Sex" also includes, but is not limited to, a person's gender, as defined in Section 422.56 of the Penal Code. (q) "Sexual orientation" means heterosexuality, homosexuality, and bisexuality. (r) "Supervisor" means any individual having the authority, in the interest of the employer, to hire, transfer, suspend, lay off, recall, promote, discharge, assign, reward, or discipline other employees, or the responsibility to direct them, or to adjust the ir grievances, or effectively to recommend that action, if, in connection with the foregoing, the exercise of that authority is not of a merely routine or clerical nature, but requires the use of independent judgment. 45 (s) "Undue hardship" means an action requiring significant difficulty or expense, when considered in light of the following factors: (1) The nature and cost of the accommodation needed. (2) The overall financial resources of the facilities involved in the provision of the reasonable accommodations, the number of persons employed at the facility, and the effect on expenses and resources or the impact otherwise of these accommodations upon the operation of the facility. (3) The overall financial resources of the covered entity, the overall size of the business of a covered entity with respect to the number of employees, and the number, type, and location of its facilities. (4) The type of operations, including the composition, structure, and functions of the workforce of the entity. (5) The geographic separateness, administrative, or fiscal relationship of the facility or facilities. HISTORY: Added Stats 1980 ch 992 § 4. Amended Stats 1985 ch 1151 § 1; Stats 1990 ch 15 § 1 (SB 1027); Stats 1992 ch 911 § 3 (AB 311), ch 912 § 3 (AB 1286), ch 913 § 21.3 (AB 1077); Stats 1993 ch 1214 § 5 (AB 551); Stats 1998 ch 99 § 1 (SB 654); Stats 1999 ch 311 § 2 (SB 1185), ch 591 § 5.1 (AB 1670), ch 592 § 3.7 (AB 1001); Stats 2000 ch 1049 § 5 (AB 2222); Stats 2003 ch 164 § 1 (AB 196); Stats 2004 ch 700 § 4 (SB 1234). Amendments: 1985 Amendment: Added (1) "or her" after "employed by his" in subd (b); and (2) subd (i). 1990 Amendment: Added subd (j). 1992 Amendment: (1) Added subd (a); (2) redesignated former subds (a)-(d) to be subds (b)-(e); (3) amended the introductory clause of subd (d) by (a) deleting ", except as hereinafter provided," before "includes"; and (b) substituting ", except as follows:" for a period; (4) added subdivision designation (d)(1); (5) added subd (d)(2); (6) added subd (f); (7) redesignated former subdivisions (e) and (f) to be subds (g) and (h); (8) substituted "includes, but is not limited to," for "means" in subd (h); (9) added subd (i); (10) 46 redesignated former subd (g) to be subd (j); (11) substituted "disability, mental disability" for "handicap" in subd (j); (12) substituted subd (k) for former subd (h) which read: "(h) 'Physical handicap' includes impairment of sight, hearing, or speech, or impairment of physical ability because of amputation or loss of function or coordination, or any other health impairment which requires special education or related services."; (13) added subds (l) and (m); (14) redesignated former subds (i) and (j) to be subds (n) and (o); and (15) added subd (p) and the last paragraph. (As amended 1992 ch 913, compared to the section as it read prior to 1992. This section was also amended by two earlier chapters, ch 911, ch 912. See Gov C § 9605.) 1993 Amendment: (1) Substituted "functions" for "duties" after "Essential" both times it appears in subd (f); (2) deleted ", but is not limited to," after "includes" in subd (h); (3) deleted former subd (l) which read: "(l) 'Reasonable accommodation' may include either of the following: "(1) Making existing facilities used by employees readily accessible to, and usable by, individuals with disabilities. "(2) Job restructuring, part-time or modified work schedules, reassignment to a vacant position, acquisition or modification of equipment or devices, adjustment or modifications of examinations, training materials or policies, the provision of qualified readers or interpreters, and other similar accommodations for individuals with disabilities. It is the intent of the Legislature that the definition of 'physical disability' in this subdivision shall have the same meaning as the term 'physical handicap' formerly defined by this subdivision and construed in American National Ins. Co. v. Fair Employment & Housing Com., 32 Cal. 3d 603. However, 'physical disability' does not include conditions excluded from the federal definition of 'disability' pursuant to Section 511 of the Americans with Disabilities Act of 1990 (42 U.S.C., § 12211). Additionally, for purposes of this part, the unlawful use of controlled substances or other drugs shall not be deemed, in and of itself, to constitute a physical disability."; (4) designated the former last paragraph in the section to be subd (l); and (5) substituted "of" for "or" after "size of the business" in subd (p)(3). 1998 Amendment: (1) Amended subd (d) by (a) substituting the comma after "indirectly" for the semicolon; and (b) adding the comma after "thereof"; (2) substituted "that" for "which" after "organization" in subd (g); (3) amended subd (h) by adding (a) "(1) genetic characteristics, or (2)" after "include" in the first sentence; and (b) the second sentence; and (4) added "and" before "(5) the geographic" in subd (p). 47 1999 Amendment: (1) Amended subd (d) by (a) substituting "of the state" for "thereof" in the introductory clause; (b) deleting subdivision designation (d)(1) at the beginning of the second paragraph; and (c) deleting former subd (d)(2) which read: "(2) 'Employer,' for purposes of provisions defining unlawful employment practices related to mental disability, means any person regularly employing 15 or more persons, or any person directly or indirectly acting as an agent of such an employer, and also includes the state and municipalities and political subdivisions of the state ."; (2) substituted subd (h) for former subd (h) which read: "(h) 'Medical condition' includes (1) genetic characteristics, or (2) any health impairment related to or associated with a diagnosis of cancer, for which a person has been rehabilitated or cured, based on competent medical evidence. For purposes of this section, 'genetic characteristics' means any scientifically or medically identifiable gene or chromosome, or combination or alteration thereof, that is known to be a cause of a disease or disorder in a person or his or her offspring, or is determined to be associated with a statistically increased risk of development of a disease or disorder, or inherited characteristics that may derive from the individual or family member, that is presently not associated with any symptoms of any disease or order."; (3) substituted "or age" at the end of subd (j); (4) added subd (m); (5) redesignated former subds (m)-(o) to be subds (n)-(p); (6) added subds (q) and (r); and (7) redesignated former subd (p) to be subd (s). (As amended Stats 1999 ch 592, compared to the section as it read prior to 1999. This section was also amended by two earlier chapters, ch 311 and ch 591. See Gov C § 9605.) 2000 Amendment: (1) Amended subd (h) by (a) adding "means" in the introductory clause; and (b) substituting "cancer or a record or history of cancer" for ", for which a person has been rehabilitated or cured, based on competent medical evidence" in subd (h)(1); (2) substituted subd (i) for former subd (i) which read: "(i) 'Mental disability' includes any mental or psychological disorder, such as mental retardation, organic brain syndrome, emotional or mental illness, and specific learning disabilities. However, 'mental disability' does not include conditions excluded from the federal definition of 'disability' pursuant to Section 511 of the Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12211). Additionally, for purposes of this part, the unlawful use of controlled substances or other drugs shall not be deemed, in and of itself, to constitute a mental disability."; and (3) substituted subd (k) for former subd (k) which read: "(k) 'Physical disability' includes, but is not limited to, all of the following: "(1) Having any physiological disease, disorder, condition, cosmetic disfigurement, or anatomical loss that does both of the following: 48 "(A) Affects one or more of the following body systems: neurological, immunological, musculoskeletal, special sense organs, respiratory, including speech organs, cardiovascular, reproductive, digestive, genitourinary, hemic and lymphatic, skin, and endocrine. "(B) Limits an individual's ability to participate in major life activities. "(2) Any other healthy impairment not described in paragraph (1) that requires special education or related services. "(3) Being regarded as having or having had a disease, disorder, condition, cosmetic disfigurement, anatomical loss, or health impairment described in paragraph (1) and (2). "(4) Being regarded as having, or having had, a disease, disorder, condition, cosmetic disfigurement, anatomical loss, or health impairment that has no present disabling effect but may become a physical disability as described in paragraph (1) or (2). "It is the intent of the Legislature that the definition of 'physical disability' in this subdivision shall have the same meaning as the term 'physical handicap' formerly defined by this subdivision and construed in American National Ins. Co. v. Fair Employment & Housing Com. (1982) 32 Cal. 3d 603. However, 'physical disability' does not include conditions excluded from the federal definition of 'disability' pursuant to Section 511 of the Americans with Disabilities Act of 1990 (42 U.S.C., Sec 12211). Additionally, for purposes of this part, the unlawful use of controlled substances or other drugs shall not be deemed, in and of itself, to constitute a physical disability." 2003 Amendment: (1) Added the second sentence of subd (p); and (2) amended subd (s) by substituting (a) "The" for "the" at the beginning of subds (s)(1)-(s)(5); and (b) the period for the comma at the end of subds (s)(1)-(s)(3) and the period for ", and" at the end of subd (s)(4). 2004 Amendment: Substituted "Section 422.56 of the Penal Code" for "Section 422.76 of the Penal Code, except that, for purposes of this part, the reference in that definition to the "victim" shall mean the employee or applicant and the reference in that definition to the 49 "defendant" shall mean the employer or other covered entity or person subject to applicable prohibitions under this part" in subd (p). 50 Appendix D The City of Vernon Notice of Compliance Under ADA & California State Law In accordance with the requirements of Title II of the Americans with Disabilities Act (ADA) of 1990, the Americans with Disabilities Amendments Act of 2008, the Fair Employment & Housing Act (FEHA), California Government Code Section 11135 and other applicable codes, the City of Vernon does not discriminate against individuals on the basis of disability in its services, programs or activities. Employment: the City of Vernon does not discriminate on the basis of disability in its hiring or employment practices and will comply with the Fair Employment and Housing Act, as well as Title I of the ADA, including the regulations promulgated by the U.S. Equal Employment Opportunity Commission (EEOC), including the requirement to provide reasonable accommodations. Effective Communication: the City of Vernon will generally, upon request, provide appropriate aids and services leading to effective communication for qu alified persons with disabilities, including sign language interpreters, documents in Braille and other alternate formats to ensure information and communication is accessible to people who have speech, hearing, vision, or cognitive impairments so they can participate equally in the programs, services and activities. Modification to Policies and Procedures: the City of Vernon will make reasonable modifications to policies and programs to ensure that people with disabilities have an equal opportunity to participate in all of its programs, services and activities. For example, individuals with service animals behaving within applicable standards are welcome in offices and City facilities, even when pets are generally prohibited. Anyone who requires auxiliary aids and services for effective communication, or a modification of policies or procedures to participate in a program, service or activity in the City of Vernon should communicate with the Disability Manager contact as soon as possible, but no later than 72 hours before the scheduled event. Neither the ADA, nor state law requires the City of Vernon to take action that would 51 fundamentally alter the nature of its programs, activities or services or impose an undue financial or administrative burden. Complaints that a program, activity or service of the City of Vernon is not accessible should be directed to: Director of Human Resources City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323) 583-8811 The City of Vernon will not place a surcharge on a particular individual with a disability or a group of individuals with disabilities to cover the cost of providing auxiliary aids and services or making a reasonable modification to a policy to create access. 52 Appendix E The City of Vernon ADA Notice Dissemination Plan Title II of the ADA, 28 CFR 35.1069 requires that the City of Vernon produce and disseminate a notice of their ADA compliance. The notice should be written clearly without undue complication. It should discuss what ADA requirements the entity is held to, the name of the ADA Coordinator, and provide current contact information enabling an individual to contact the ADA Coordinator. The notice should cover areas regarding: -Employment; -Effective Communication; -Making reasonable modification to policies and programs; -An explanation of the non-surcharge requirement concerning the provision of auxiliary aids and services; and -Information regarding the grievance process. In considering how to disseminate this document, the City should identify the impacted parties who would have an interest in the notice. The notice dissemination plan should address the frequency of notice dissemination. Methods of dissemination may include: -The City’s website; - Local Newspaper(s); -City Publications; -Posters on City facilities; -Inclusion of notice for special activities; -Within transportation systems provided by the City; -Within City Programs and Services meetings and materials; and -Other forms in which impacted stakeholders might be present. Not all of the above notice dissemination methodologies may be necessary to effectively disseminate the notice. 928 CFR 35.106 Notice: A public entity shall make available to applicants, participants, beneficiaries, and other interested persons information regarding the provisions of this part and its applicability to the services, programs, or activities of the public entity, and make such information available to them in such manner as the head of the entity finds necessary to apprise such persons of the protections against discrimination assured them by the Act and this part. 53 Appendix F Grievance Procedure under ADA or California State Disability Civil Rights Laws This grievance procedure is established to meet the requirements of the Americans with Disabilities Act of 1990 (“ADA”), the Americans with Disabilities Amendments Act (ADAAA) and California State law. It may be used by anyone wishing to file a complaint alleging discrimination on the basis of disability in the provision of services, activities, programs or benefits by the City of Vernon. The City’s Disability Discrimination Policy governs employment-related complaints of disability discrimination. The complaint should be in writing and contain information about the alleged discrimination such as name, address, phone number of the complainant and location, date and a description of the problem(s). The City currently does not have an ADA Grievance Form. In Appendix G, there is a sample ADA Grievance Form that the City will adopt after the December 15, 2020 City Council Meeting. Alternative means of filing a complaint, such as personal interviews or a tape recording of the complaint, are available to persons with disabilities upon request. The complaint should be submitted by the grievant and/or his/her d esignee as soon as possible, but no later than 60 calendar days after the alleged violation to: 54 Director of Human Resources City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323) 583-8811 Appendix G ADA Grievance Form (Sample) ADA Title II Grievance Form Instructions: Please fill out as much of this form as you can in black ink or type. If you need assistance, tell us and we would be happy to provide assistance with filling out this form. Sign and return (mail, fax or e-mail) to the following information listed below. Name: Address: City: State: Zip Code: Telephone (Home): Telephone (Business): Telephone (Mobile): E-Mail: Person (if other than the grievant) alleging Violation of Title II of the Americans with Disabilities Act: Address: City: State: Zip Code: Telephone (Home): Telephone (Business): Telephone (Mobile): COMPLAINT 55 Access issues generally fall into one of three categories, please indicate which category best describes your issue. Physical/Architectural Access – Is the issue related to a physical barrier, for example, a wheelchair ramp is needed, counters are too high for wheelchair users, missing braille signage, etc. Programmatic Access – Is the issue related to being able to participate in a program, service or activity. For example, is there a City policy, practice, and/or procedure that you allege does not provide an equally effective opportunity for persons with disabilities to participate in or benefit from the City’s programs and services. Communication Access – Is the issue related to communication, for example do you need auxiliary aids and services, a sign language interpreter, Communication Access Real-Time Translation (CART) materials in alternative formats in order to have equal access to information and communication with a City Department’s programs, services or activities. City Department, Bureau or Service: Address: City: State: Zip Code: Telephone: When did the alleged violation occur? Describe the alleged act(s) of discrimination, providing name(s) where possible of the individuals who allegedly violated Title II: Has this complaint been filed with the Department of Justice or any other Federal, State, or local civil rights agency or court? If yes, please complete the following information below. Agency or Court: Contact Person: 56 Address: City: State: Zip Code: Telephone: Date Filed: Additional space for description of alleged act of violation: Strict confidentiality of all complaint information will be maintained. Sharing of information will be done only as needed to resolve the complaint. Signature: Date: 57 Appendix H Contact Information for the City of Vernon Risk Management/Disability Manager: Director of Human Resources City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323) 583-8811 58 Appendix I - Surveys Finance Treasury Printed Communications 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 59 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 3. Has your Department identified local resources that can p rovide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is captioned, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after they have been released? 5. Does your Department have a policy in place for securing video remote interpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 6. If your Department has a Public Information Officer that communicates with the press and releases critical information, is an American Sign Language interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? 60 Is there anything else you'd like to add regarding your Department's communication with people who are Deaf or Hard of Hearing? Software & Digital Communication 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 61 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding your Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to you r Project Manager. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non -discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to request reasonable accommodation? 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how often it is offered, and ho w attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manager. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations? 62 7. How are the essential functions of a position determined? 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the ADA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or emp loyees to request a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this process is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 63 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 14. If reasonable modifications are used to create access, are they approved before they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documented to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 64 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training regarding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Project Manager. General Purchases 1. When purchasing items for installation, what checks are in place to ensure installation will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you c onsider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 3. When furniture is purchased, does the Department consider accessibility fa ctors such as is knee clearance for tables and clear space within a room? 65 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not placed beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Public Meetings 1. Does the Department hold or sponsor events that are available to the public? (If yes, please complete this section. If no, please skip to the next section). 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this checklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with disabilities? 3a. If yes, please provide a copy of this training to your Project Manager. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and recorded. 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to respond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and public telephones; and seating) is evaluated and implemented. 66 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals are welcome? 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck microphone attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people who use wheelchairs? 13a. Does this reserved seating also include integrated companion seating? 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 67 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for person s needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that peop le with disabilities are able to participate in public speaking at all events, e.g. public comment? 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 18b. If training is provided, please provide a copy of that training to your Project Manager. 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 68 19a. If events include displays, are the displays accessible and on an accessible route? 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? Emergency Procedures 1. Does your Department have procedures in place regarding the evacuation of persons with disabilities? 1a. If yes, please provide a copy of those procedures to your Project Manager. 1b. If yes, how often are relevant Department staff trained on those procedures, and how is this training tracked and recorded? 1c. If staff are trained on these procedures, how often is this training updated and/or reviewed? 2. Does your Department utilize Department vehicles for transporting civilians in any instance, including emergency evacuation incidents? 2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please describe in detail, if applicable). 2b. If yes, are relevant Department staff trained in how to transport persons with disabilities? (Please describe in detail, if applicable). 3. Does your Department work in partnership with other entities regarding the set up and administration of evacuation shelters or centers? 3a. If yes, please describe the Department’s role in this partnership. 3b. If yes, does the Department have a checklist regarding accessibility at evacuation shelters or centers? 3c. Please provide a copy of this checklist, if applicable, to your Project Manager. Records 1. In what format does your Department maintain records that are available to the public? (e.g. hard copy, digital). 69 2. How does your Department ensure that digital records are fully accessible to persons with disabilities? 3. Does your Department permit members of the public to visit your facility or facilities to physically examine hard copies (printed) records? 3a. If yes, how does your Department ensure that public records’ examination areas are accessible to persons with disabilities? 4. Does your Department offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents? 4a. If so, please describe the assistance you offer, including how this assistance is publicized and how the public may make a request for assistance. General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these services are fully accessible. 4. Does your Department offer transportation services? 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 5a. If yes, are they accessible to people with disabilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 70 7a. If yes, how do you ensure that people with disabilities are able to access the information included on these documents (e.g. persons who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessib ility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 11a. If yes, please describe how these were resolved. 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a re habilitation program? 12a. If yes, when was it last updated? 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Does your Department purchase software for use by employees or the public? 13a. If so, how does your Department ensure that this software is accessible? 14. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 14a. If yes, please list any areas where you think training may be beneficial. 71 Fire Printed Communications 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 72 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 3. Has your Department identified local resources that can provide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is caption ed, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after they have been released? 5. Does your Department have a policy in place for securing video remote interpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 6. If your Department has a Public Information Officer that communicates with the pre ss and releases critical information, is an American Sign Language interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? Is there anything else you'd like to add regarding your Department's communication with people who are Deaf or Hard of Hearing? Software & Digital Communication 73 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 74 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding your Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to your Project Manager. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non -discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to request reasonable accommodation? 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how o ften it is offered, and how attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manager. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations? 7. How are the essential functions of a position determined? 75 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the ADA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or employees to request a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this process is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 76 14. If reasonable modifications are used to create access, are they approved before they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documented to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 77 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training regarding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Project Manager. Purchasing, Contracts, Vendors 1. When the purchase of new equipment is made, (purchases including, but not limite d to, communication and transportation equipment) is it reviewed to ensure the equipment is accessible to users with disabilities? 1a. If yes, please describe how accessibility reviews of new equipment are performed. 2. Are all public documents related to bidding and contracting available to persons with disabilities in alternative format if needed? 3. Are meetings related to bidding and contracting held in accessible locations? 4. Do all City contracts have language in place holding contractors and vendors to applicable State and Federal disability civil rights mandates? 4a. If yes, how is this enforced? 5. How does the Department ensure that all products and services offered by third parties and vendors are fully accessible? 6. Is an accessibility plan check done when vendors are conducting tenant improvements in public service areas? 7. Is guidance in place for staff and vendors regarding clear space and furniture placement? 7a. If yes, when was it last updated? 7b. If yes, please provide a copy of the guidance documentation to your Project Manager. 78 8. If an employee or member of the public with a disability believes they have been discriminated against by a County vendor or contractor, what steps are available to them to remedy their concerns? Construction and Remodels 1. Do all design contracts hold design professionals to designs that use, at minimum, the most stringent access standards in effect at the time of the project? 2. Do design contracts encourage design professionals to exceed the maximum access standards when possible to ensure that construction tolerances are built into the project? Please describe. 3. Is a policy in place that mandates Certified Access Specialist (CASp) inspections at key points of construction and at completion, before final payment is made? 3a. If yes, please provide a copy of the policy documentation to your Project Manager. 4. Are major public projects reviewed by stakeholders with disabilities during the planning stage? 4a. If yes, please describe how these reviews are con ducted. General Purchases 1. When purchasing items for installation, what checks are in place to ensure installation will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you consider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 79 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 3. When furniture is purchased, does the Department consider accessibility factors such as is knee clearance for tables and clear space within a room? 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not placed beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Facilities and Real Estate Management 1. Does your Department ensure accessibility of any public rights of way (PRoW)? 1a. If yes, please describe how your Department achieves this, including accessibility requirements of sidewalks, parking lots, paths of travel to and from Department facilities. 1b. If yes, please provide a copy of any policies and/or Department procedures to your Project Manager, and include information on when these were last updated. 1c. If yes, please describe how the Department monitors PRoW for accessibility issues, including but not limited to broken sidewalks, PRoW obstructions (including temporary obstructions), and overhangs into the PRoW that interfere with clear head space. 1d. If yes, does your Department receive complaints from the public regarding inaccessible PRoW? How does the Department ensure that methods for receiving these complaints (e.g. via telephone, web-based forms, email) are accessible to people with disabilities? 2. Does your Department have an accessibility construction inspection checklist for use by building code officials/building inspectors as a reference guide to assist with on -site inspection of accessibility features and construction elements affecting acce ssibility compliance to your facilities? 2a. If yes, when was it last updated? 2b. If yes, please provide a copy of the checklist to your Project Manager. 3. Is there a policy and/or procedure in place ensuring proper maintenance of accessible features? 3a. If yes, when was this last updated? 80 3b. If yes, how are the relevant staff made aware of these policies and procedures? 3c. If yes, how are these policies and/or procedures enforced? 3d. If yes, please provide a copy of the policy and procedure to your Project Manager. Fleet Services 1. Does your Department utilize vehicles for transportation? (If yes, continue with this section; if no, please skip this section.) 2. When procuring and maintaining vehicles for transportation uses, what procedures and/or guidelines does your Department follow or implement to ensure that these vehicles are accessible to persons with disabilities? 3. Does your Department offer training to transportation providers regarding disability awareness and how to ensure access and safety to riders with disabilities (including the use of tie-downs)? 3a. If yes, please describe the training. 3b. If yes, please provide a copy of the training to your Project Manager. 3c. If yes, please describe how often this training is offered, tracked and recorded. 3d. If no, is there another Department within the City that offers this training? 4. Are service animals allowed on transportation systems? 5. Have there been any complaints regarding inaccessible transportation services? 5a. If yes, how were those resolved? Public Meetings 1. Does the Department hold or sponsor events that are available to the public? (If yes, please complete this section. If no, please skip to the next section). 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this checklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with disabilities? 81 3a. If yes, please provide a copy of this training to your Project Manager. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and recorded. 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to respond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and public telephones; and seating) is evaluated and implemented. 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals are welcome? 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck microphone 82 attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people who use wheelchairs? 13a. Does this reserved seating also include integrated companion seating? 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for persons needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment? 83 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 18b. If training is provided, please provide a copy of that training to your Project Manager. 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 19a. If events include displays, are the displays accessible and on an accessible route? 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? Emergency Procedures 1. Does your Department have procedures in place regarding the evacuation of persons with disabilities? 1a. If yes, please provide a copy of those procedures to your Project Manager. 1b. If yes, how often are relevant Department staff trained on those procedures, and how is this training tracked and recorded? 1c. If staff are trained on these procedures, how often is this training updated and/or reviewed? 84 2. Does your Department utilize Department vehicles for transporting civilians in any instance, including emergency evacuation incidents? 2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please describe in detail, if applicable). 2b. If yes, are relevant Department staff trained in how to transport persons with disabilities? (Please describe in detail, if applicable). 3. Does your Department work in partnership with other entities regarding the set up and administration of evacuation shelters or centers? 3a. If yes, please describe the Department’s role in this partnership. 3b. If yes, does the Department have a checklist regarding accessibility at evacuation shelters or centers? 3c. Please provide a copy of this checklist, if applicable, to your Project Manager. Records 1. In what format does your Department maintain records that are available to the public? (e.g. hard copy, digital). 2. How does your Department ensure that digital records are fully accessible to persons with disabilities? 3. Does your Department permit members of the public to visit your facility or facilities to physically examine hard copies (printed) records? 3a. If yes, how does your Department ensure that public records’ examination areas are accessible to persons with disabilities? 4. Does your Department offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents? 4a. If so, please describe the assistance you offer, including how this assistance is publicized and how the public may make a request for assistance. General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 85 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these services are fully accessible. 4. Does your Department offer transportation services? 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 5a. If yes, are they accessible to people with disab ilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 7a. If yes, how do you ensure that people with disabilities are able to access the information included on these documents (e.g. person s who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessibility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 86 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 11a. If yes, please describe how these were resolved. 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program? 12a. If yes, when was it last updated? 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 13a. If yes, please list any areas where you think training may be beneficial. Health Printed Communications 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 87 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 3. Has your Department identified local resources that can provide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is captioned, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after they have been released? 5. Does your Department have a policy in place for securing video remote interpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 88 6. If your Department has a Public Information Officer that communicates with the press and releases critical information, is an American Sign Language interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? Is there anything else you'd like to add regarding your Department's communication with people who are Deaf or Hard of Hearing? Software & Digital Communication 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 89 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding you r Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to your Project Manager. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non-discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to r equest reasonable accommodation? 90 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how often it is offered, and how attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manager. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations? 7. How are the essential functions of a position determined? 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the ADA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or employees to request a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 91 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this process is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 14. If reasonable modifications are used to create access, are they approved before they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documented to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 92 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training rega rding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Project Manager. Purchasing, Contracts, Vendors 1. When the purchase of new equipment is made, (purchases including, but not limited to, communication and transportation equipment) is it reviewed to ensure the equipment is accessible to users with disabilities? 1a. If yes, please describe how accessibility reviews of new equipment are performed. 2. Are all public documents related to bidding and contracting available to persons with disabilities in alternative format if needed? 3. Are meetings related to bidding and contracting held in accessible locations? 93 4. Do all City contracts have language in place holding contractors and vendors to applicable State and Federal disability civil rights mandates? 4a. If yes, how is this enforced? 5. How does the Department ensure that all products and services offered by third parties and vendors are fully accessible? 6. Is an accessibility plan check done when vendors are conducting tenant improvements in public service areas? 7. Is guidance in place for staff and vendors regarding clear space and furniture placement? 7a. If yes, when was it last updated? 7b. If yes, please provide a copy of the guidance documentation to your Project Manager. 8. If an employee or member of the public with a disability believes they have been discriminated against by a County vendor or contractor, what steps are available to them to remedy their concerns? General Purchases 1. When purchasing items for installation, what checks are in place to ensure installation will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you con sider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 94 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 3. When furniture is purchased, does the Department consider accessibility fact ors such as is knee clearance for tables and clear space within a room? 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not placed beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Facilities and Real Estate Management 1. Does your Department ensure accessibility of any public rights of way (PRoW)? 1a. If yes, please describe how your Department achieves this, including accessibility requirements of sidewalks, parking lots, paths of travel to and from Department facilities. 1b. If yes, please provide a copy of any policies and/or Department procedures to your Project Manager, and include information on when these were last updated. 1c. If yes, please describe how the Department monitors PRoW for accessibility issues, including but not limited to broken sidewalks, PRoW obstructions (including temporary obstructions), and overhangs into the PRoW that interfere with clear head space. 1d. If yes, does your Department receive complaints from the public regarding inaccessible PRoW? How does the Department ensure that methods for receiving these complaints (e.g. via telephone, web-based forms, email) are accessible to people with disabilities? 2. Does your Department have an accessibility construction inspection checklist for use by building code officials/building inspectors as a reference guide to assist with on -site inspection of accessibility features and construction elements affecting accessibility compliance to your facilities? 2a. If yes, when was it last updated? 2b. If yes, please provide a copy of the checklist to your Project Manager. 3. Is there a policy and/or procedure in place ensuring proper maintenance of accessible features? 3a. If yes, when was this last updated? 95 3b. If yes, how are the relevant staff made aware of these policies and procedures? 3c. If yes, how are these policies and/or procedures enforced? 3d. If yes, please provide a copy of the policy and procedure to your Project Manager. Health 1. Is the Department responsible for ensuring access to necessary medical care for persons with special needs, i.e. disabilities? 1a. If yes, please describe how Department achieves this, and include copies of any relevant policies, procedures, and guidelines. 2. How does the Department protect the environment and ensuring the health and safety of its residents, workers, visitors and neighboring communities? 3. For any emergency preparedness programs administered by the Department, do these programs include special considerations or guidance for persons with disabilities? 3a. If yes, please describe these emergency preparedness programs. 3b. If yes, please provide any programmatic documentation to your Project Manager. Fleet Services 1. Does your Department utilize vehicles for transportation? (If yes, continue with this section; if no, please skip this section.) 2. When procuring and maintaining vehicles for transportation uses, what procedures and/or guidelines does your Department follow or implement to ensure that these vehicles are accessible to persons with disabilities? 3. Does your Department offer training to transportation providers regarding disability awareness and how to ensure access and safety to riders with disabilities (including the use of tie-downs)? 3a. If yes, please describe the training. 3b. If yes, please provide a copy of the training to your Project Manager. 3c. If yes, please describe how often this training is offered, tracked and recorded. 3d. If no, is there another Department within the City that offers this training? 4. Are service animals allowed on transportation systems? 96 5. Have there been any complaints regarding inaccessible transportation services? 5a. If yes, how were those resolved? Public Meetings 1. Does the Department hold or sponsor events that are available to the public? (If yes, please complete this section. If no, please skip to the next section). 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this che cklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with disabilities? 3a. If yes, please provide a copy of this training to your Project Mana ger. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and recorded. 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to respond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and public telephones; and seating) is evaluated and implemented. 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 97 7. Are the indoor or outdoor surfaces where persons with d isabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals a re welcome? 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck microphone attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people who use wheelchairs? 13a. Does this reserved seating also include integrated companion seating? 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 98 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for persons needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment? 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 18b. If training is provided, please provide a copy of that training to your Project Manager. 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 19a. If events include displays, are the displays accessible and on an accessible route? 99 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? Emergency Procedures 1. Does your Department have procedures in place regarding the evacuation of persons with disabilities? 1a. If yes, please provide a copy of those procedures to your Project Manager. 1b. If yes, how often are relevant Department staff trained on those procedures, and how is this training tracked and recorded? 1c. If staff are trained on these procedures, how often is this training updated and/or reviewed? 2. Does your Department utilize Department vehicles for transporting civilians in any instance, including emergency evacuation incidents? 2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please describe in detail, if applicable). 2b. If yes, are relevant Department staff trained in how to transport persons with disabilities? (Please describe in detail, if applicable). 3. Does your Department work in partnership with other entities regarding the set up and administration of evacuation shelters or centers? 3a. If yes, please describe the Department’s role in this partnership. 3b. If yes, does the Department have a checklist rega rding accessibility at evacuation shelters or centers? 3c. Please provide a copy of this checklist, if applicable, to your Project Manager. Records 1. In what format does your Department maintain records that are available to the public? (e.g. hard copy, digital). 2. How does your Department ensure that digital records are fully accessible to persons with disabilities? 100 3. Does your Department permit members of the public to visit your facility or facilities to physically examine hard copies (printed) records? 3a. If yes, how does your Department ensure that public records’ examination areas are accessible to persons with disabilities? 4. Does your Department offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents? 4a. If so, please describe the assistance you offer, including how this assistance is publicized and how the public may make a request for assistance. General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these services are fully accessible. 4. Does your Department offer transportation services? 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 5a. If yes, are they accessible to people with disabilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 101 7a. If yes, how do you ensure that people with disabilities are able to access the information included on these documents (e.g. persons who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessibility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 11a. If yes, please describe how these were resolved. 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program? 12a. If yes, when was it last updated? 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 13a. If yes, please list any areas where you think training m ay be beneficial. HR Printed Communications 102 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 103 3. Has your Department identified local resources that can provide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is captioned, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after they have been released? 5. Does your Department have a policy in place for securing video remote inte rpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 6. If your Department has a Public Information Officer that communicate s with the press and releases critical information, is an American Sign Language interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiti ng rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? Is there anything else you'd like to add regarding your Department's communication with people who are Deaf or Hard of Hearing? Software & Digital Communication 104 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 105 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding your Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to your Project Manager. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non -discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to request reasonable accommodation? 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how often it is offered, and how attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manager. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations? 7. How are the essential functions of a position determined? 106 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the A DA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or employees to request a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this proce ss is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 107 14. If reasonable modifications are used to create access, are they approved before they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documente d to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 108 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training regarding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Pr oject Manager. Purchasing, Contracts, Vendors 1. When the purchase of new equipment is made, (purchases including, but not limited to, communication and transportation equipment) is it reviewed to ensure the equipment is accessible to users with disabilities? 1a. If yes, please describe how accessibility reviews of new equipment are performed. 2. Are all public documents related to bidding and contracting available to persons with disabilities in alternative format if needed? 3. Are meetings related to bidding and contracting held in accessible locations? 4. Do all City contracts have language in place holding contractors and vendors to applicable State and Federal disability civil rights mandates? 4a. If yes, how is this enforced? 5. How does the Department ensure that all products and services offered by third parties and vendors are fully accessible? 6. Is an accessibility plan check done when vendors are conducting tenant improvements in public service areas? 7. Is guidance in place for staff and vendors regarding clear space and furniture placement? 7a. If yes, when was it last updated? 7b. If yes, please provide a copy of the guidance documentation to your Project Manager. 109 8. If an employee or member of the public with a disability believes they have bee n discriminated against by a County vendor or contractor, what steps are available to them to remedy their concerns? General Purchases 1. When purchasing items for installation, what checks are in place to ensure installation will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you consider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 3. When furniture is purchased, does the Department consider accessibility factors such as is knee clearance for tables and clear space within a room? 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not placed beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Facilities and Real Estate Management 1. Does your Department ensure accessibility of any public rights of way (PRoW)? 1a. If yes, please describe how your Department achieves this, including accessibility requirements of sidewalks, parking lots, paths of travel to and from Department facilities. 110 1b. If yes, please provide a copy of any policies and/o r Department procedures to your Project Manager, and include information on when these were last updated. 1c. If yes, please describe how the Department monitors PRoW for accessibility issues, including but not limited to broken sidewalks, PRoW obstruction s (including temporary obstructions), and overhangs into the PRoW that interfere with clear head space. 1d. If yes, does your Department receive complaints from the public regarding inaccessible PRoW? How does the Department ensure that methods for receivi ng these complaints (e.g. via telephone, web-based forms, email) are accessible to people with disabilities? 2. Does your Department have an accessibility construction inspection checklist for use by building code officials/building inspectors as a reference guide to assist with on-site inspection of accessibility features and construction elements affecting accessibility compliance to your facilities? 2a. If yes, when was it last updated? 2b. If yes, please provide a copy of the checklist to your Project Manager. 3. Is there a policy and/or procedure in place ensuring proper maintenance of accessible features? 3a. If yes, when was this last updated? 3b. If yes, how are the relevant staff made aware of these policies and procedures? 3c. If yes, how are these policies and/or procedures enforced? 3d. If yes, please provide a copy of the policy and procedure to your Project Manager. Planning, Construction, Buildings 1. When examining plans, does the Department evaluate accessibility requirements? 1a. If yes, please describe how the Department does this, and please attach any relevant Departmental documentation (e.g. guidelines, checklists, procedures). 2. During construction, does the Department evaluate construction sites for accessible paths of travel along public rights of way for persons with disabilities? 2a. If yes, please describe how the Department does this. 2b. If yes, please send any relevant Departmental documentation (e.g. guidelines, checklists, procedures) to your Project Manager. 111 3. Does the Department receive public complaints regarding building accessibility for persons with disabilities? 3a. If yes, please describe how these are submitted to the Department by the public. 3b. If yes, please provide examples of complaints, including how those were resolved. 3c. If yes, please provide any relevant Departmental documentation, including intake forms, internal processes, etc.) to your Project Manager. 4. Does the Department have any staff or employees who evaluate accessibility of built environments for persons with disabilities? 4a. If yes, please provide supplemental information, e.g. # of FTEs, certifications required, job description(s). Public Meetings 1. Does the Department hold or sponsor events that are available to the public? (I f yes, please complete this section. If no, please skip to the next section). 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this checklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with di sabilities? 3a. If yes, please provide a copy of this training to your Project Manager. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and recorded. 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to respond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 112 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and public telephones; and seating) is evaluated and implemented. 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals are welcome? 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck microphone attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people who use wheelchairs? 13a. Does this reserved seating also include integrated companion seating? 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 113 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for persons needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment? 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 114 18b. If training is provided, please provide a cop y of that training to your Project Manager. 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 19a. If events include displays, are the displays accessible and on an accessible route? 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? Emergency Procedures 1. Does your Department have procedures in place regarding the evacuation of persons with disabilities? 1a. If yes, please provide a copy of those procedures to your Project Manager. 1b. If yes, how often are relevant Department staff trained on those procedures, and how is this training tracked and recorded? 1c. If staff are trained on these procedures, how often is this training updated and/or reviewed? 2. Does your Department utilize Department vehicles for transporting civilians in any instance, including emergency evacuation incidents? 2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please describe in detail, if applicable). 2b. If yes, are relevant Department staff trained in how to transport persons with disabilities? (Please describe in detail, if applicable). 3. Does your Department work in partnership with other entities regarding the set up and administration of evacuation shelters or centers? 3a. If yes, please describe the Department’s role in this partnership. 115 3b. If yes, does the Department have a checklist regarding accessibility at evacuation shelters or centers? 3c. Please provide a copy of this checklist, if applicable, to your Project Manager. Records 1. In what format does your Department maintain records that are available to the public? (e.g. hard copy, digital). 2. How does your Department ensure that digital records are fully accessible to persons with disabilities? 3. Does your Department permit members of the public to visit your facility or facilities to physically examine hard copies (printed) records? 3a. If yes, how does your Department ensure that public records’ examination areas are accessible to persons with disabilities? 4. Does your Department offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents? 4a. If so, please describe the assistance you offer, including how this assistance is publicized and how the public may make a request for assistance. General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these services are fully accessible. 4. Does your Department offer transportation services? 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 116 5a. If yes, are they accessible to people with disabilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 7a. If yes, how do you ensure that people with disabilities a re able to access the information included on these documents (e.g. persons who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessibility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 11a. If yes, please describe how these were resolved. 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program? 12a. If yes, when was it last updated? 117 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Does your Department purchase software for use by employees or the public? 13a. If so, how does your Department ensure that this software is accessible? 14. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 14a. If yes, please list any areas where you think training may be beneficial. 118 IT Printed Communications 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 119 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 3. Has your Department identified local resources that can provide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is captioned, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after they have been released? 5. Does your Department have a policy in place for securing video remote interpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 6. If your Department has a Public Information Officer that communicates with the p ress and releases critical information, is an American Sign Language interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? Is there anything else you'd like to add regarding your Department's communication with people who are Deaf or Hard of Hearing? Software & Digital Communication 120 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 121 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding your Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to your Project Manager. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non-discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to request reasonable accommodation? 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how often it is offered, and how attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manager. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations? 7. How are the essential functions of a position determined? 122 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the ADA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or employees to request a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this process is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 123 14. If reasonable modifications are used to create access, are they approved before they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documented to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 124 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training regarding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Project Manager. Information Technology (IT) 1. How does IT ensure that all Information & Communication Technology services within its purview are fully accessible? 2. How does IT ensure that all mobile applications developed on your behalf are fully accessible? 3. What version of the Web Content Accessibility Guidelines (WCAG) does IT apply in software development? 4. Have you ever received any complaints regarding a lack of digital / web accessibility by any of your employees, volunteers, users? 4a. If yes, please describe, and include how these complaints were resolved. 5. How and how often does IT conduct accessibility checks, and how encompassing are these checks? 6. Does the IT Department offer and/or receive regular training regarding digital and web accessibility? 6a. If yes, please describe the training, provide copies of any relevant documents, and describe how training is tracked and recorded. General Purchases 1. When purchasing items for installation, what checks are in place to ensure installati on will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to 125 reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you consider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 3. When furniture is purchased, does the Department consider accessibility factors such as is knee clearance for tables and clear space within a room? 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not placed beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Public Meetings 1. Does the Department hold or sponsor events that are availab le to the public? (If yes, please complete this section. If no, please skip to the next section). 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this checklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with disabilities? 3a. If yes, please provide a copy of this training to your Project Manager. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and record ed. 126 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to respond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and public telephones; and seating) is evaluated and implemented. 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals are welcome? 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck microphone attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people wh o use wheelchairs? 127 13a. Does this reserved seating also include integrated companion seating? 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for persons needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment? 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 128 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 18b. If training is provided, please provide a copy of that training to your Project Manager. 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 19a. If events include displays, are the displays accessible and on an accessible route? 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these services are fully accessible. 4. Does your Department offer transportation services? 129 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 5a. If yes, are they accessible to people with disabilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 7a. If yes, how do you ensure that people with disabilities a re able to access the information included on these documents (e.g. persons who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessibility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 11a. If yes, please describe how these were resolved. 130 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program? 12a. If yes, when was it last updated? 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 13a. If yes, please list any areas where you think training may be beneficial. 131 Police Printed Communications 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 132 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 3. Has your Department identified local resources that can provide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is captioned, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after the y have been released? 5. Does your Department have a policy in place for securing video remote interpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 6. If your Department has a Public Information Officer that communicates with the press and releases critical information, is an American Sign Language interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? Is there anything else you'd like to add regarding your Department's communication with people who are Deaf or Hard of Hearing? Software & Digital Communication 133 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 134 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding your Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to your Project Manager. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non -discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to request reasonable accommodation? 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how often it is offered, and how attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manage r. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations? 7. How are the essential functions of a position determined? 135 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the ADA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or employees to request a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this process is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 136 14. If reasonable modifications are used to create access, are they approved before they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documented to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 137 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training regarding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Project Manager. Purchasing, Contracts, Vendors 1. When the purchase of new equipment is made, (purchases including, but not limited to, communication and transportation equipment) is it reviewed to ensure the equipment is accessible to users with disabilities? 1a. If yes, please describe how accessibility reviews of new equipment are performed. 2. Are all public documents related to bidding and contracting available to persons with disabilities in alternative format if needed? 3. Are meetings related to bidding and contracting held in accessible locations? 4. Do all City contracts have language in place holding contractors and vendors to applicable State and Federal disability civil rights mandates? 4a. If yes, how is this enforced? 5. How does the Department ensure that all products and services offered by third parties and vendors are fully accessible? 6. Is an accessibility plan check done when vendors are conducting tenant improvements in public service areas? 7. Is guidance in place for staff and vendors regarding clear space and furniture placement? 7a. If yes, when was it last updated? 7b. If yes, please provide a copy of the guidance documentation to your Project Manager. 138 8. If an employee or member of the public with a disability believes they have been discriminated against by a County vendor or contractor, what steps are available to them to remedy their concerns? General Purchases 1. When purchasing items for installation, what checks are in place to ensure installation will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you consider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 3. When furniture is purchased, does the Department consider accessibility factors such as is knee clearance for tables and clear space within a room? 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not pl aced beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Facilities and Real Estate Management 1. Does your Department ensure accessibility of any public rights of way (PRoW)? 1a. If yes, please describe how your Department achieves this, including accessibility requirements of sidewalks, parking lots, paths of travel to and from Department facilities. 139 1b. If yes, please provide a copy of any policies and/or Department procedures to your Project Manager, and include information on when these were last updated. 1c. If yes, please describe how the Department monitors PRoW for accessibility issues, including but not limited to broken sidewalks, PRoW obstructions (including temporary obstructions), and overhangs into the PRoW that interfere with clear head space. 1d. If yes, does your Department receive complaints from the public regarding inaccessible PRoW? How does the Department ensure that methods for receiving these complaints (e.g. via telephone, web-based forms, email) are accessible to people with disabilities? 2. Does your Department have an accessibility construction inspection checklist for use by building code officials/building inspectors as a reference guide to assist with on-site inspection of accessibility features and construction elements affecting accessibility compliance to your facilities? 2a. If yes, when was it last updated? 2b. If yes, please provide a copy of the checklist to your Project Manager. 3. Is there a policy and/or procedure in place ensuring proper maintenance of accessible features? 3a. If yes, when was this last updated? 3b. If yes, how are the relevant staff made aware of these policies and procedures? 3c. If yes, how are these policies and/or procedures enforced? 3d. If yes, please provide a copy of the policy and procedure to your Project Manager. Fleet Services 1. Does your Department utilize vehicles for transportation? (If yes, continue with this section; if no, please skip this section.) 2. When procuring and maintaining vehicles for transportation uses, what procedures and/or guidelines does your Department follow or implement to ensure that these vehicles are accessible to persons with disabilities? 3. Does your Department offer training to transportation providers regarding disability awareness and how to ensure access and safety to riders with disabilities (including the use of tie-downs)? 3a. If yes, please describe the training. 140 3b. If yes, please provide a copy of the training to your Project Manager. 3c. If yes, please describe how often this training is offered, tracked and recorded. 3d. If no, is there another Department within the City that offers this training? 4. Are service animals allowed on transportation systems? 5. Have there been any complaints regarding inaccessible transportation services? 5a. If yes, how were those resolved? Public Meetings 1. Does the Department hold or sponsor events that are available to the public? (If yes, please complete this section. If no, please skip to the next section). 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this checklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with disabilities? 3a. If yes, please provide a copy of this training to your Project Manager. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and recorded. 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to re spond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 141 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and public telephones; and seating) is evaluated and implemented. 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals are welcome? 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck micro phone attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people who use wheelchairs? 13a. Does this reserved seating also include integrated companion seating? 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 142 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for persons needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment? 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 18b. If training is provided, please provide a copy of that training to your Project Manager. 143 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 19a. If events include displays, are the displays accessible and on an accessible route? 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? Emergency Procedures 1. Does your Department have procedures in place regarding the evacuation of persons with disabilities? 1a. If yes, please provide a copy of those procedures to your Project Manager. 1b. If yes, how often are relevant Department staff trained on those procedures, and how is this training tracked and recorded? 1c. If staff are trained on these procedures, how often is this training updated and/or reviewed? 2. Does your Department utilize Department vehicles for transporting civilians in any instance, including emergency evacuation incidents? 2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please describe in detail, if applicable). 2b. If yes, are relevant Department staff trained in how to transport persons with disabilities? (Please describe in detail, if applicable). 3. Does your Department work in partnership with other entities regarding the set up and administration of evacuation shelters or centers? 3a. If yes, please describe the Department’s role in this partnership. 3b. If yes, does the Department have a checklist regarding accessibility at evacuation shelters or centers? 3c. Please provide a copy of this checklist, if applicable, to your Project Manager. 144 Custody 1. Have the Department’s first responders been trained regarding the disability civil rights mandates that the County is held to under State and Federal laws? 2. Have holding and booking areas been reviewed for access since the 2010 ADA Standards for Accessible Design became effective? 2a. If visitor areas are offered, are they accessible? 3. If inmate phone systems are provided, is there a phone system for inmates who are deaf or hard of hearing? 4a. When arrests are made how are service animals dealt with? 4b. When arrests are made, how are medical appliances (canes, walkers, hearing aids, oxygen tanks, etc.) addressed? 4c. When arrests are made, how are power wheelchairs, scooters and other large mobility devices transported after an arrest? 4d. When arrests are made, how are medication needs handled? 5. When an officer is giving information (direction or Miranda Rights) to a person with a communication related limitation, how is it determined that the person understands the information being communicated? 6. How do officers communicate with persons who are deaf? 7. Does the 911 system have TTY? 7a. If yes, how often is it tested and does training occur regarding its use? 8. Is there a procedure in place for officers to obtain a sign language interpreter when one is needed on an emergency basis? 9 Have officers been trained regarding the best techniques for communication with persons with disabilities and officer safety? 10. Are there other issues you feel should be addressed in dealing with disability civil rights and your role within the City of Vernon? If yes, please explain. Records 1. In what format does your Department maintain records that are available to the public? (e.g. hard copy, digital). 145 2. How does your Department ensure that digital records are fully accessible to persons with disabilities? 3. Does your Department permit members of the public to visit your facility or facilities to physically examine hard copies (printed) records? 3a. If yes, how does your Department ensure that public records’ examination areas are accessible to persons with disabilities? 4. Does your Department offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents? 4a. If so, please describe the assistance you offer, including how this assistance is publicized and how the public may make a request for assistance. General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these services are fully accessible. 4. Does your Department offer transportation services? 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 5a. If yes, are they accessible to people with disabilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 146 7a. If yes, how do you ensure that people with disabilities are able to access the information included on these documents (e.g. persons who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessibility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 11a. If yes, please describe how these were resolved. 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program? 12a. If yes, when was it last updated? 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 13a. If yes, please list any areas where you think training may be beneficial. 147 Public Utilities Printed Communications 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 148 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 3. Has your Department identified local resources that can provide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is captioned, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after they have been released? 5. Does your Department have a policy in place for securing video remote interpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 6. If your Department has a Public Information Officer that communicates with the press and releases critical information, is an American Sign Language interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? Is there anything else you'd like to add regarding your Department's communication with people who are Deaf or Hard of Hearing? Software & Digital Communication 149 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 150 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding your Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to your Project Man ager. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non -discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to request reasonable accommodation? 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how often it is offered, and how attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manager. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of t he job with or without reasonable accommodations? 7. How are the essential functions of a position determined? 151 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the ADA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or employees to reque st a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this process is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 152 14. If reasonable modifications are used to create access, are they approved befo re they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documented to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 153 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training regarding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Project Manager. Purchasing, Contracts, Vendors 1. When the purchase of new equipment is made, (purchases including, but not limited to, communication and transportation equipment) is it reviewed to ensure the equipment is accessible to users with disabilities? 1a. If yes, please describe how accessibility reviews of new equipment are performed. 2. Are all public documents related to bidding and contracting available to persons w ith disabilities in alternative format if needed? 3. Are meetings related to bidding and contracting held in accessible locations? 4. Do all City contracts have language in place holding contractors and vendors to applicable State and Federal disability civil rights mandates? 4a. If yes, how is this enforced? 5. How does the Department ensure that all products and services offered by third parties and vendors are fully accessible? 6. Is an accessibility plan check done when vendors are conducting tenant improvements in public service areas? 7. Is guidance in place for staff and vendors regarding clear space and furniture placement? 7a. If yes, when was it last updated? 7b. If yes, please provide a copy of the guidance documentation to your Project Manager. 154 8. If an employee or member of the public with a disability believes they have been discriminated against by a County vendor or contractor, what steps are available to them to remedy their concerns? General Purchases 1. When purchasing items for installation, what checks are in place to ensure installation will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you consider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 3. When furniture is purchased, does the Department consider accessibility factors such as is knee clearance for tables and clear space within a room? 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not placed beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Facilities and Real Estate Management 1. Does your Department ensure accessibility of any public rights of way (PRoW)? 1a. If yes, please describe how your Department achieves this, including accessibility requirements of sidewalks, parking lots, paths of travel to and from Department facilities. 155 1b. If yes, please provide a copy of any policies and/or Department procedures to your Project Manager, and include information on when these were last updated. 1c. If yes, please describe how the Department monitors PRoW for accessibility issues, including but not limited to broken sidewalks, PRoW obstructions (including temporary obstructions), and overhangs into the PRoW that interfere with clear head space. 1d. If yes, does your Department receive complaints from the public regarding inaccessible PRoW? How does the Department ensure that methods for receiving these complaints (e.g. via telephone, web-based forms, email) are accessible to people with disabilities? 2. Does your Department have an accessibility construction inspection checklist for use by building code officials/building inspectors as a reference guide to assist with on -site inspection of accessibility features and construction elements affecting a ccessibility compliance to your facilities? 2a. If yes, when was it last updated? 2b. If yes, please provide a copy of the checklist to your Project Manager. 3. Is there a policy and/or procedure in place ensuring proper maintenance of accessible features? 3a. If yes, when was this last updated? 3b. If yes, how are the relevant staff made aware of these policies and procedures? 3c. If yes, how are these policies and/or procedures enforced? 3d. If yes, please provide a copy of the policy and procedure to your Project Manager. Planning, Construction, Buildings 1. When examining plans, does the Department evaluate accessibility requirements? 1a. If yes, please describe how the Department does this, and please attach any relevant Departmental documentation (e.g. guidelines, checklists, procedures). 2. During construction, does the Department evaluate construction sites for accessible paths of travel along public rights of way for persons with disabilities? 2a. If yes, please describe how the Department does this. 2b. If yes, please send any relevant Departmental documentation (e.g. guidelines, checklists, procedures) to your Project Manager. 156 3. Does the Department receive public complaints regarding building accessibility for persons with disabilities? 3a. If yes, please describe how these are submitted to the Department by the public. 3b. If yes, please provide examples of complaints, including how those were resolved. 3c. If yes, please provide any relevant Departmental documentation, including in take forms, internal processes, etc.) to your Project Manager. 4. Does the Department have any staff or employees who evaluate accessibility of built environments for persons with disabilities? 4a. If yes, please provide supplemental information, e.g. # of FTEs, certifications required, job description(s). Fleet Services 1. Does your Department utilize vehicles for transportation? (If yes, continue with this section; if no, please skip this section.) 2. When procuring and maintaining vehicles for transportation uses, what procedures and/or guidelines does your Department follow or implement to ensure that these vehicles are accessible to persons with disabilities? 3. Does your Department offer training to transportation providers regarding disability awareness and how to ensure access and safety to riders with disabilities (including the use of tie-downs)? 3a. If yes, please describe the training. 3b. If yes, please provide a copy of the training to your Project Manager. 3c. If yes, please describe how often this training is offered, tracked and recorded. 3d. If no, is there another Department within the City that offers this training? 4. Are service animals allowed on transportation systems? 5. Have there been any complaints regarding inaccessible transportation services? 5a. If yes, how were those resolved? Public Meetings 1. Does the Department hold or sponsor events that are available to the public? (If yes, please complete this section. If no, please skip to the next section). 157 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this checklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with disabilities? 3a. If yes, please provide a copy of this training to your Project Manager. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and recorded. 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to respond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and pub lic telephones; and seating) is evaluated and implemented. 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals are welcome? 158 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck microphone attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people who use wheelchairs? 13a. Does this reserved seating also include integrated companion seating? 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for persons needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 159 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment? 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 18b. If training is provided, please provide a copy of that training to your Project Manager. 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 19a. If events include displays, are the displays accessible and on an accessible route? 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? Records 160 1. In what format does your Department maintain records that are available to the public? (e.g. hard copy, digital). 2. How does your Department ensure that digital records are fully accessible to persons with disabilities? 3. Does your Department permit members of the public to visit your facility or facilities to physically examine hard copies (printed) records? 3a. If yes, how does your Department ensure that public records’ examination areas are accessible to persons with disabilities? 4. Does your Department offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents? 4a. If so, please describe the assistance you offer, including how this assistance is publicized and how the public may make a request for assistance. General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these service s are fully accessible. 4. Does your Department offer transportation services? 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 5a. If yes, are they accessible to people with disabilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 161 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 7a. If yes, how do you ensure that people with disabilities are able to access the information included on these documents (e.g. persons who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessibility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 11a. If yes, please describe how these were resolved. 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program? 12a. If yes, when was it last updated? 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 162 13a. If yes, please list any areas where you think training may be beneficial. 163 Public Works Printed Communications 1. Do all of your Department’s printed publications and notices inform readers that the publications are available in alternative formats, if needed, for persons with disabilities? 1a. If yes, is this mandated by the City or specific to your Department? 1b. If yes, is the notification language standard to the City or created by your Department? 1c. If yes, please provide a copy of the text offering alternative formats. 2. Do all of your Department’s printed publications and notices use a certain font type and size for City published documents? 2a. If yes, what font type and size is used? 2b. If yes, is this mandated by the City or specific to your Department? 3. Has your Department reviewed all publications and notices to determine whether they portray persons with disabilities in a demeaning or offensive manner? 3a. If yes, when was this review last performed? 3b. If yes, how regularly is this review performed? 4. Has your Department trained its staff to ensure that all publications and correspondence use “person first language”? 4a. If yes, is this training provided by the City or the Department? 4b. If yes, how often are staff provided this training, and how is this training tracked and recorded? (type "N/A" if not applicable) Is there anything else you'd like to add regarding your Department's printed communication? Communication With People Who are Deaf or Hard of Hearing (DHH) 1. Does your Department list “711 the California Relay” on business cards and letterheads? 2. Are your Department’s telephone lines accessible to persons who are DHH? 2a. If yes, please describe how the Department ensures this accessibility. 164 2b. If yes, how often are your Department’s telephone lines tested to ensure accessibility? 3. Has your Department identified local resources that can provide auxiliary aids for communication as needed? 3a. If yes, please describe. 3b. If yes, please describe how the public is informed of these resources, and how they are informed on how to request them. 4. If your Department uses video for any reason or in any forum (e.g. internal employee training, public outreach via the web on social media, YouTube, etc.) is that video captioned? 4a. If yes, please describe how the Department ensures that video is captioned, including any processes or vendors utilized to caption videos. 4b. If yes, are videos captioned before use, or at some later date after they have been released? 5. Does your Department have a policy in place for securing video remote interpreting services (VRI)? 5a. If yes, please provide a copy of the policy to your Project Manager. 5b. If yes, (but there is no written policy to be uploaded) please describe in detail. 6. If your Department has a Public Information Officer that communicates with the press and releases critical information, is an American Sign Lang uage interpreter visible and within the screenshot if television cameras are in use or is a captioning service used? 7. Does the Department play videos in public spaces, e.g. waiting rooms or lobbies, for the public? 7a. If so, are these videos captioned? 8. Does the Department use any public address systems? 8a. If so, how does the Department ensure that information broadcast by these systems is available to people who may be DHH? Is there anything else you'd like to add regarding your Department's communi cation with people who are Deaf or Hard of Hearing? Software & Digital Communication 165 1. Does the Department ensure that its webpage is accessible to persons with disabilities by applying Web Content Accessibility Guidelines (WCAG)? (See, e.g. https://www.w3.org/WAI/standards-guidelines/wcag/) 1a. If yes, is this mandated by the City? 1b. If yes, how does the Department make sure its webpage meets the WCAG? 1c. If yes, what version of the WCAG does the Department apply to its webpage access requirements? 2. Does the Department use any web-based forms for use internally or by the public? 2a. If yes, how does the Department ensure that these meet WCAG? 3. Does the Department use any internally-developed software, including mobile applications and payment systems, either internally or externally? 3a. If yes, how does the Department ensure that these meet WCAG? 4. Does the Department use any third party software, including mobile applications and payment systems, either internally or externally? 4a. If yes, how does the Department ensure that these meet WCAG? 5. Does the Department use any touch screen information systems for public interaction? 5a. If yes, is there an independent operating system for persons with visual impairments? 6. Does the Department offer any type of computer or digital device for use by the public? 6a. If yes, are they equipped with software that makes them accessible to persons with visual impairments? 6b. If yes, how does the Department ensure that these devices and the software on them is accessible? 7. In email communications (both internal and external), does the Department ensure that all communications – including attachments – comply with WCAG? 7a. Are PDFs checked for accessibility? 7b. Are PDFs also sent out as Word documents? 166 7c. Are all photos captioned with descriptive text? Is there anything else you'd like to add regarding your Department's software and digital communication? Staff & Employees 1. Does the Department affirmatively recruit persons with disabilities for available positions? 1a. If yes, please describe these efforts and outreach. 2. Does the Department ensure that all of its job listings are accessible to persons with disabilities? 2a. If yes, please send any pertinent documents to your Project Manage r. 2b. If yes but there are no pertinent documents, please describe how this is done. 3. Do Department job listings contain a statement of non -discrimination against persons with disabilities? 3a. If yes, please provide a the text of this statement and reference to policy or supporting documents. 4. Does the Department offer candidates for employment the opportunity to request reasonable accommodation? 4a. If yes, please send any pertinent documents to your Project Manager. 4b. If you attached documents, please describe those. 5. Are interview panel members trained regarding disability awareness and appropriate interactions with people with disabilities? 5a. If yes, please describe the training, including how often it is offered, and how attendance is tracked and recorded. 5b. If yes, please send any pertinent documents to your Project Manager. 6. When your department conducts employment interviews, is the decision to hire based upon which candidate is best qualified to perform the essential functions of the job with or without reasonable accommodations? 7. How are the essential functions of a position determined? 167 8. Does the Department offer Staff and Employees an opportunity to self-identify as a person with a disability? 9. How does the Department ensure that all employee events (e.g. holiday parties), are fully accessible? 10. Does the Department offer training on accessibility best practices and/or the ADA to staff, employees and/or volunteers? 10a. If so, how often is this training offered? 10b. If so, is this training optional or mandatory? 10c. If so, how is attendance tracked and recorded? 10d. Please provide a copy of all training(s) to your Project Manager. 11. Does the Department ensure that all opportunities for advancement and education are available and accessible to Staff and Employees who may have a disability? This includes, but is not limited to certifications, workshops, trainings, conferences, meetings, etc. 12. Does the Department have a process for its staff and/or employees to request a reasonable accommodation? 12a. Please describe and/or attach copies (below) of any pertinent policies or procedures. 12a continued (please send any pertinent policies or procedures to your Project Manager) 12b. Please also fully describe the interactive process, as well as how documentation regarding these processes are maintained. 13. Does the Department’s reasonable accommodation process include a search for transfer into a vacant, funded role as an accommodation of last resort? 13a. If yes, please provide all Departmental documentation and guidance regarding this process to your Project Manager. 13b. If yes, please describe in detail how this process is implemented, including how long a search is conducted, and what criteria are utilized to determine whether a transfer is appropriate and can be achieved. 13c. If yes, does the Department require persons seeking this reasonable accommodation to compete for the vacant role? 168 14. If reasonable modifications are used to create access, are they appr oved before they are put in place? 14a. If yes, by whom? Please include name and position. 15. When reasonable modifications are put in place, are they documented to ensure staff implements them appropriately? 15a. If yes, how is the reasonable modification(s) documented? What information is included in the documentation? 16. Does the Department ensure that it’s facilities and offices are fully accessible? 16a. If yes, please describe. 17. Is there an anti-disability harassment policy? 17a. If your Department has a written anti-disability harassment policy, please provide a copy of that to your Project Manager. 17b. If yes, is it based upon zero tolerance or the legal definition of disability harassment? 17c. If yes, how often is it disseminated to all staff? 18. Does your Department’s grievance system offer assistance to people with disabilities who, due to their disability, are not able to independently complete the grievance? 18a. Does your Department’s grievance system provide timelines when a complainant can expect a result? 18b. Does your Department’s grievance system have a second level of review? 18b continued. If yes, please state the position responsible for a second level of review. 18c. Does your Department’s grievance system contain a notice regarding availability of the grievance system in alternative formats: braille, large print, audio? 18d. Does your Department’s grievance system contain the name and contact information of the ADA Coordinator? 19. Has your Department received any complaints or grievances regarding failure to reasonably accommodate and/or lack of accessibility by candidates, employees, or visitors to any of your offices? 169 19a. Please explain your answer to Question 19, above, including the resolution to any complaints. 20. Does your Department supervise any maintenance staff? 20a. If yes, do maintenance staff receive training regarding maintaining an accessible built environment? 21. Does the Department have a policy regarding service and/or support animals for its employees? 21a. If yes, please provide a copy of the relevant policies to your Project Manager. Purchasing, Contracts, Vendors 1. When the purchase of new equipment is made, (purchases including, but not limited to, communication and transportation equipment) is it reviewed to ensure the equipment is accessible to users with disabilities? 1a. If yes, please describe how accessibility reviews of new equipment are performed. 2. Are all public documents related to bidding and contracting available to persons with disabilities in alternative format if needed? 3. Are meetings related to bidding and contracting held in accessible locations? 4. Do all City contracts have language in place holding contractors and vendors to applicable State and Federal disability civil rights mandates? 4a. If yes, how is this enforced? 5. How does the Department ensure that all products and services offered by third parties and vendors are fully accessible? 6. Is an accessibility plan check done when vendors are conducting tenant improvements in public service areas? 7. Is guidance in place for staff and vendors regarding clear space and furniture placement? 7a. If yes, when was it last updated? 7b. If yes, please provide a copy of the guidance documentation to your Project Manager. 170 8. If an employee or member of the public with a disability believes they have been discriminated against by a County vendor or contractor, what steps are available to them to remedy their concerns? Construction and Remodels 1. Do all design contracts hold design professionals to designs that use, at minimum, the most stringent access standards in effect at the time of the project? 2. Do design contracts encourage design professionals to exceed the maximum access standards when possible to ensure that construction tolerances are built into the project? Please describe. 3. Is a policy in place that mandates Certified Access Specialist (CASp) inspections at key points of construction and at completion, before final payment is made? 3a. If yes, please provide a copy of the policy documentation to your Project Manager. 4. Are major public projects reviewed by stakeholders with disabilities during the planning stage? General Purchases 1. When purchasing items for installation, what checks are in place to ensure installatio n will be compliant with current building standards? (e.g. toilet paper dispensers must be located below the grab bar; items may not protrude more than 4” from the wall in a path of travel if they are placed at an elevation above 27” or below 80”; clear space available for a wheelchair user to approach the item for use; an item must not require a person to reach higher than 48” or lower than 15” to operate unless the user must reach over other items to operate, etc.) 1b. Please describe how you ensure that purchased and installed items are maintained so as to ensure current building standards (e.g. waste baskets are not kept in required maneuvering clearances; subsequently installed items do not obstruct clear spaces and reach ranges, etc.) 2. When purchasing an item that contains an operational part, do you consider accessibility requirements, e.g. ability to operate with one hand; maximum 5lbs operational pressure; no grasping, pinching, and twisting; etc.)? 2a. If yes, please describe how these considerations are made and implemented. 2b. If yes, how does the Department ensure that any operable part is maintained to remain accessible (e.g. parts do not get rusty, stuck, or otherwise outside operable part accessibility requirements)? 171 3. When furniture is purchased, does the Department consider accessibility factors such as is knee clearance for tables and clear space within a room? 3a. If yes, please describe how these considerations are made and implemented. 3b. If yes, please describe how these features are maintained (e.g. items are not placed beneath tables which may obstruct knee clearances, or additional furniture is added to a room which may obstruct clear space). Facilities and Real Estate Management 1. Does your Department ensure accessibility of any public rights of way (PRoW)? 1a. If yes, please describe how your Department achieves this, including accessibility requirements of sidewalks, parking lots, paths of travel to and from Department facilities. 1b. If yes, please provide a copy of any policies and/or Department procedures to your Project Manager, and include information on when these were last updated. 1c. If yes, please describe how the Department monitors PRoW for accessibility issues, including but not limited to broken sidewalks, PRoW obstructions (including temporary obstructions), and overhangs into the PRoW that interfere with clear head space. 1d. If yes, does your Department receive complaints from the public regarding inaccessible PRoW? How does the Department ensure that methods for receiving these complaints (e.g. via telephone, web-based forms, email) are accessible to people with disabilities? 2. Does your Department have an accessibility construction inspection checklist for use by building code officials/building inspectors as a reference guide to assist with on-site inspection of accessibility features and construction elements affecting accessibility compliance to your facilities? 2a. If yes, when was it last updated? 2b. If yes, please provide a copy of the checklist to your Project Manager. 3. Is there a policy and/or procedure in place ensuring proper maintenance of accessible features? 3a. If yes, when was this last updated? 3b. If yes, how are the relevant staff made aware of these policies and procedures? 3c. If yes, how are these policies and/or procedures enforced? 172 3d. If yes, please provide a copy of the policy and procedure to your Project Manager. Planning, Construction, Buildings 1. When examining plans, does the Department evaluate accessibility requirements? 1a. If yes, please describe how the Department does this, and please attach any relevant Departmental documentation (e.g. guidelines, checklists, procedures). 2. During construction, does the Department evaluate construction sites for accessib le paths of travel along public rights of way for persons with disabilities? 2a. If yes, please describe how the Department does this. 2b. If yes, please send any relevant Departmental documentation (e.g. guidelines, checklists, procedures) to your Project Manager. 3. Does the Department receive public complaints regarding building accessibility for persons with disabilities? 3a. If yes, please describe how these are submitted to the Department by the public. 3b. If yes, please provide examples of complaint s, including how those were resolved. 3c. If yes, please provide any relevant Departmental documentation, including intake forms, internal processes, etc.) to your Project Manager. 4. Does the Department have any staff or employees who evaluate accessibility of built environments for persons with disabilities? 4a. If yes, please provide supplemental information, e.g. # of FTEs, certifications required, job description(s). Capital Projects 1. Does your department have an accessibility checklist that it uses for all Capital projects? 1a. If yes, please provide a copy of this checklist and/or any pertinent documentation to your Project Manager. 1b. If yes, when was this last updated? 1c. If yes, how does your Department ensure that accessibility is implemented in all Capital projects? Fleet Services 173 1. Does your Department utilize vehicles for transportation? (If yes, continue with this section; if no, please skip this section.) 2. When procuring and maintaining vehicles for transportation uses, what procedures and/or guidelines does your Department follow or implement to ensure that these vehicles are accessible to persons with disabilities? 3. Does your Department offer training to transportation providers regarding disabili ty awareness and how to ensure access and safety to riders with disabilities (including the use of tie-downs)? 3a. If yes, please describe the training. 3b. If yes, please provide a copy of the training to your Project Manager. 3c. If yes, please describe how often this training is offered, tracked and recorded. 3d. If no, is there another Department within the City that offers this training? 4. Are service animals allowed on transportation systems? 5. Have there been any complaints regarding inaccessible transportation services? 5a. If yes, how were those resolved? Public Meetings 1. Does the Department hold or sponsor events that are available to the public? (If yes, please complete this section. If no, please skip to the next section). 2. Does the Department have an event planning accessibility checklist to ensure that all public meetings and events are fully accessible? 2a. If yes, please provide a copy of this checklist to your Project Manager. 2b. If yes, who maintains and updates this checklist? 3. If security checks are required to attend any public function, are security personnel trained in best practices for conducting security checks for persons with disabilities? 3a. If yes, please provide a copy of this training to your Project Manager. 3b. If yes, please describe this training (if not uploaded), including how often it is updated and offered, and how attendance is tracked and recorded. 4. Do all meeting notices contain an announcement that reasonable accommodations are available for persons with disabilities as needed and/or upon request? 174 4a. If yes, please provide the text that is included in all notices of public meetings. 5. Are all persons who administer public meetings trained in how to respond to requests for reasonable accommodations by members of the public? 5a. If yes, please describe what training is provided, including how often it is provided and how attendance is tracked and recorded. 6. Does the Department take steps to ensure that all meetings are held in buildings and rooms that are fully accessible? 6a. If so, please describe how the physical accessibility of public meeting spaces (including: paths of travel; entrances; circulation routes; registration counters or tables; building amenities such as water fountains, restrooms and public telephones; and seating) is evaluated and implemented. 6b. Is staff trained to set up meeting rooms to provide maneuvering space for persons who use wheelchairs or service animals? 7. Are the indoor or outdoor surfaces where persons with disabilities will travel smooth, stable and slip resistant? 8. Are public meetings held on sites that are accessible by public transportation? 8a. If no, please explain why not. 9. Do public meeting notices contain language indicating that service animals are welcome? 9a. If yes, please provide the text of this notification. 10. Are service animal relief areas identified before every public meeting? 11. Are emergency exits identified before every public meeting? 12. Are stages, speaking platforms, microphones and other items to be used by persons with disabilities accessible? (Note: When considering microphone access please take into account podium elevations, touch screen control systems, gooseneck microphone attached to the center of tables without knee clearance for wheelchair users, and persons who will not be able to hand hold any equipment.) 13. Do all public meetings have reserved seating for people who use wheelchairs? 13a. Does this reserved seating also include integrated companion seating? 175 14. Are all presenters at public meetings trained on best practices for presenting content to persons with disabilities, eg. reading powerpoints aloud? 14a. If yes, how and how often are these trainings offered, and how is attendance tracked and recorded? 15. Are FM Loop systems (Assistive Listening Devices) available for persons who are hard of hearing? 15a. If FM Loop systems are being used, do meeting hosts ensure that all comments made during the meeting go through the PA system? 15b. If FM Loop systems are used, are all meeting hosts trained on how to operate these? 15c. If FM Loop systems are used, are all meeting hosts trained on how to operate these? How often, and how is this training tracked and recorded? 16. Are sign language interpreters and/or real-time captioners available for all public meetings? 16a. If yes, please indicate how these resources are made known and available to the public. 16b. If yes, is there reserved seating at the front of the room for persons needing these accommodations? 16c. If yes, are sign language interpreters positioned beneath adequate lighting, and close to the speaker? 16d. If yes, are two sign language interpreters retained for meetings or events lasting more than two hours? 16e. If yes, are sign language interpreters and real time captioners provided information before the meeting/event regarding any unusual terms or difficult to spell names that will be part of the program? 17. What processes are in place to ensure that people with disabilities are able to participate in public speaking at all events, e.g. public comment? 17a. If speaker cards are used, is staff available to assist persons with disabilities, as needed, in completing the cards? 17b. Are podiums or dais’ used for public speaking or public comment accessible (e.g. lowered podiums, adjustable microphones, etc.) 176 17c. If public comment time is limited, is the time increased for persons who have speech impairments? 18. Do any public events utilize security measures (e.g. magnometers, wands, bag checks)? 18a. If yes, are Security personnel trained in best practices for conducting security checks of persons with disabilities? 18b. If training is provided, please provide a copy of that training to your Project Manager. 18c. If training is provided, please describe or provide a copy of that training, including how and how often it is offered, and how attendance is tracked and recorded. 19. What processes are in place to ensure that exhibits, displays, and other materials offered to the public are fully accessible? 19a. If events include displays, are the displays accessible and on an accessible route? 19b. If parts of an exhibit are inaccessible due to technical infeasibility, is video with captioning used to display the exhibit? 19c. Are all brochure racks, holders and literature displays accessible to people with disabilities, including, e.g. all materials on an accessible route, with appropriate reach ranges and clear floor space? Emergency Procedures 1. Does your Department have procedures in place regarding the evacuation of persons with disabilities? 1a. If yes, please provide a copy of those procedures to your Project Manager. 1b. If yes, how often are relevant Department staff trained on those procedures, and how is this training tracked and recorded? 1c. If staff are trained on these procedures, how often is this training updated and/or reviewed? 2. Does your Department utilize Department vehicles for transporting civilians in any instance, including emergency evacuation incidents? 2a. If yes, are transport vehicles equipped to transport persons with disabilities? (Please describe in detail, if applicable). 177 2b. If yes, are relevant Department staff trained in how to transport persons with disabilities? (Please describe in detail, if applicable). 3. Does your Department work in partnership with other entities regarding the set up and administration of evacuation shelters or centers? 3a. If yes, please describe the Department’s role in this partnership. 3b. If yes, does the Department have a checklist regarding accessibility at evacuation shelters or centers? 3c. Please provide a copy of this checklist, if applicable, to your Project Manager. Records 1. In what format does your Department maintain records that are available to the public? (e.g. hard copy, digital). 2. How does your Department ensure that digital records are fully accessible to persons with disabilities? 3. Does your Department permit members of the public to visit your facility or facilities to physically examine hard copies (printed) records? 3a. If yes, how does your Department ensure that public records’ examination areas are accessible to persons with disabilities? 4. Does your Department offer assistance to persons with disabilities with regard to public records services, e.g. filing, requesting documents, reviewing documents? 4a. If so, please describe the assistance you offer, including how this assistance is publicized and how the public may make a request for assistance. General 1. Does your Department have an ADA Notice of Compliance posted? 1a. If yes, please describe where this notice is posted. 2. Does your Department have any policies regarding service and/or emotional support animals for its employees and/or the public? 2a. If yes, please provide a copy of any pertinent documentation to your Project Manager. 3. If your Department offers public services on site, e.g. intake and counseling, please describe how your Department ensures that these services are fully accessible. 178 4. Does your Department offer transportation services? 4a. If yes, please describe how the Department ensures that these services are fully accessible to persons with disabilities. 5. Does your Department have electronic informational kiosks? 5a. If yes, are they accessible to people with disabilities? 6. Does your Department offer printed informational brochures to the public? 6a. If yes, are these offered in large print formats? 6b. If yes, are these brochures offered in accessible locations (e.g. with adequate clear floor space and within reach ranges for persons who use mobility devices)? 7. Does your Department issue any warnings, penalties and/or citations? 7a. If yes, how do you ensure that people with disabilities are able to access the information included on these documents (e.g. persons who may be blind or visually impaired)? 8. Does your Department offer or host any trainings, meetings, or other events available to the public? 8a. If yes, does your Department have a checklist to ensure accessibility? 8a (part two) please provide any checklist used to ensure accessibility at public events to your Project Manager. 8b. If yes, are these events in accessible facilities? 8c. If yes, are these event facilities on public transportation routes? 9. Is your Department is involved in automation initiatives (e.g. web and mobile applications) that interface with the public? 9a. If yes, how do you ensure that these are fully accessible to persons with disabilities? 10. How does your Department receive complaints of lack of accessibility or requests for reasonable accommodation from the public? 10a. Please provide any pertinent policies and/or procedures to your Project Manager. 11. Has your Department received any complaints regarding a failure to reasonably accommodate or lack of accessibility? 179 11a. If yes, please describe how these were resolved. 12. Does your Department have a policy in place that prohibits discrimination against people who formerly used drugs illegally and have been through a rehabilitation program? 12a. If yes, when was it last updated? 12b. If yes, please provide a copy of this policy to your Project Manager. 13. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 13a. If yes, please list any areas where you think training may be beneficial. 14. Based on all of the above question, are there areas where you feel training of Department staff would be beneficial? 14a. If yes, please list any areas where you think training may be beneficial. 180 Appendix J Documents appended to survey responses 181 Appendix K Glossary of Terms and Basic information The following glossary of terms is designed to give a basic overview of common elements of access within the Americans with Disabilities Act, Title II, and California State law. For more specific information concerning the terms described below please review 28 CFR 35 and the California Government Code 12926. Definition of Disability: Under California State law, Government Code Section 12926, a person with a disability is: 1) A person having a physical or mental impairment that limits a major life activity. This limitation must be considered in the unmitigated status. This means that the determination of whether the limitation exists would be considered in terms of how the individual would function without the use of medication, personal devices or habits that have been formed to mitigate the disability. 2). or, A person who has a record of a disability, such as described in number one. 3). or, A person who is regarded as having a disability, such as described in number one. Note: This is an abridged definition of disability under California State law. For further information, please see California Government Code 12926. The California definition of disability is being used, as it is more stringent then the definition found under the Americans with Disabilities Act of 1990 or the Americans with Disabilities Amendments Act of 2008. Qualified Person with a Disability A qualified person with a disability has a disability as described above and is qualified to receive the programs, services or activities of the entity in question. Self-Evaluation A comprehensive evaluation of all programs, services and activities to ensure that access for qualified persons with disabilities is in place. The Self-Evaluation must be vetted with interested stakeholders. The Self-Evaluation was due in 1993. Transition Plan A physical access evaluation of all sites from which programs, services and activities are provided. The Transition Plan contains four parts: 1. A list of physical barriers; 2. A statement of method to be utilized for mitigation of barriers; 3. A statement regarding the schedule of barrier mitigation; and, 4. The designation an official who is responsible for the administration of the Transition Plan. The Transition Plan was due in 1992. The Transition Plan must be vetted with interested stakeholders. Note: The intent was to create access within facilities that were online in 1992 and that new construction or remodels would be accessible. 182 Program Access A designated alternative manner in providing programs, services and activities in order to ensure that appropriate access is in place. For example, accessible meeting space may be secured on the ground floor of the building to hold meetings with people who have mobility impairments, who are not able to go to the second floor because of the absence of an elevator. ADA Grievance Procedure A grievance process that is published and capable of addressing issues that may arise from access policies that impact the delivery of programs, services and activities. The grievance procedure must be widely disseminated, offer a second level review, notify the grievant of the outcome, state the ADA Coordinator's name and contact information and offer assistance to a person with a disability who may not be able to complete the grievance document independently due to their disability. Notice of ADA Compliance Notice of ADA Compliance is a widely disseminated notice that provides information concerning the elements of ADA compliance that the entity has in place. It is recommended that the Notice of ADA compliance be accompanied by a dissemination plan. ADA Coordinator This position is required for state and local government entities that have 50 or more employees. Initially, the position was envisioned to coordinate the grievance process. The national trend is that this position is now used to coordinate a variety of matters relative to ADA implementation and administration. Caution must be exercised concerning an appropriate separation of duties. It is inappropriate to have the ADA Coordinator engaged in both providing reasonable accommodations through the interactive process, and investigating issues concerning the accommodations that have been provided or denied. Direct Threat Direct threat is a significant risk of substantial harm that cannot be mitigated through policy modification or reasonable accommodation. The danger must be rea l and not speculative or remote. Policy Modification Request and Fundamental Alteration A qualified person with a disability may request that an entity modify its policies to create an appropriate level of access. A system must be in place for entertainin g these requests and determining whether said request would result in a fundamental alteration of the programs, services and activities impacted. Should there be an inability to grant the initial request, other measures must be considered if available, to address the access issue in question. Should it be determined that the request results in the 183 fundamental alteration, a senior official should expeditiously sign off on the determination. Auxiliary Aids and Services These are measures provided to ensure that appropriate access to programs and services and activities is in place upon request. Auxiliary aids and services include, but are not limited to providing documents in an alternative format such as Braille, providing sign language interpreting services, note takers, real-time captioning services or assistive listening devices. Video Remote Interpreting (VRI) VRI is permitted in the 2010 Title II ADA regulations. It provides a system in which sign language interpreting can be conducted via video with the interpreter offsite. Caution needs to be exercised to ensure that the technical quality of the system is sufficient to appropriately transmit the information being communicated. California Relay Service The California Relay Service was created by ADA, Title IV. It is a free service to facilitate effective telephone communication between persons who are Deaf and Hard of Hearing and persons who are hearing. This is done via a relay operator who uses both a teletype device and a telephone. The California Relay service may be reached at 711. Note: Some entities have chosen to include “California Relay Service 711” on business cards and letterheads to facilitate communication. Reasonable Accommodation Reasonable accommodation technically refers to the employment relationship. It is an adjustment that provides the employee or applicant an opportunity to participate in: the performance of essential functions of the job, the selection process or to receive benefits and privileges offered to other employees in the work situation. Reasonable accommodation solutions often vary widely. Accommodation requests must be handled through an "interactive process". Interactive Process: The interactive process is required in the state law and federal case law, yet neither defines it clearly. Problems have occurred when disputes have arisen and the employer has not clearly documented the interactive process. For that reason, the following steps are recommended: 1. The employer becomes aware that there is a disability that impacts elements of the employment relationship. 2. The employer and employee/applicant meet to discuss the barrier in question and potential resolutions. In this stage needed data is gathered from medic al providers, consultants or the Jobs Accommodation Network. 3. After giving primary consideration to what the employee/applicant is requesting, the employer makes a prompt decision regarding what effective accommodation will be provided. Or, if the accommodation in question would result in an undue hardship the employer is not obligated to provide said accommodation. 184 4. The employer promptly implements the reasonable accommodation. 5. The employer initiates follow-up discussions with the recipient of reasonable accommodation to ensure that the accommodation was, in fact, effective. Note: The reasonable accommodation process is ongoing and may need to be revisited at any point in the employment relationship, as disabilities and technology may change. Medical Inquiry Medical inquiry is the acquisition of pertinent medical information to determine whether a bona fide legal disability exists and what limitations it may present that necessitates a reasonable accommodation. Medical inquiry should be limited in scope. Data related to genetic characteristics should not be solicited, obtained or retained. Medical information may not be lawfully stored in an employee's personnel file. Undue Hardship An undue hardship would be the provision of a reasonable accommodation that is extensive, disruptive, fundamentally alters the nature of the program or is unduly expensive. It is important to note that the expense issue is extremely difficult for a state or local government entity to use as a defense . In doing so, one would need to consider the total budget of the entity in question. Service Animal A service animal is a dog or miniature horse that has specifically been trained to perform tasks for a person with a disability that they are not able to perform for themselves due to their disability. Note: This is a subject that generates the highest number of complaints received by the US Department of Justice. Maintenance of Accessible Features Policy This relates to the requirement set by 28 CFR 35.133 in which an entity must maintain accessible features. Policy and procedure in this area is designed to give staff guidance unifying, repairing or reporting issues within access elements on sites where programs, services and activities are conducted. 185 City of Vernon Americans with Disabilities Act Transition Plan Report Prepared by: Sally Swanson Architects, Inc. 2600 West Olive Avenue, 5th Floor Burbank, CA 91505 Ian Blakey, Project Manager Josh Klipp, Program Access Specialist City of Vernon 2020 ADA Transition Plan ACKNOWLEDGEMENT Sally Swanson Architects, Inc. (SSA) would like to thank the City of Vernon staff that were very generous with their time and knowledge, without which, this project would not have been possible. 1 City of Vernon 2020 ADA Transition Plan TABLE OF CONTENTS Acknowledgement ................................................................................................ 1 TABLE OF CONTENTS .................................................................................................. 2 SECTION I: EXECUTIVE SUMMARY ..............................................................................5 INTRODUCTION: DEVELOPMENT OF ADA TRANSITION PLAN ...................... 5 OVERVIEW: SELF-EVALUATION OF POLICIES, PROCEDURES AND PRACTICES ......................................................................................................... 7 OVERVIEW: ACCESS COMPLIANCE SURVEYS OF FACILITIES ..................... 8 Report Production ................................................................................................. 9 Prioritization Criteria for Barrier Mitigation – Facilities ........................................ 10 OVERVIEW: ACCESS COMPLIANCE SURVEYS OF THE PUBLIC RIGHTS-OF- WAY ................................................................................................................... 12 Prioritization Criteria for Barrier Mitigation – Public Rights-of-Way ..................... 13 OFFICIAL(S) RESPONSIBLE ............................................................................ 16 PUBLIC INPUT ....................................................................................................18 TRANSITION PLAN IMPLEMENTATION ............................................................19 Maintenance of Accessible Features ...................................................................19 Implementation Policies .......................................................................................20 NOTICE OF COMPLIANCE UNDER ADA & CALIFORNIA STATE LAW ...........22 ADA GRIEVANCE PROCEDURE .......................................................................24 SECTION II: APPENDIX ................................................................................................26 Appendix A: Access Compliance Survey Report of Facilities ............................. 27 Table of Contents ............................................................................................... 28 Navigation & Legend .......................................................................................... 29 Facilities List ....................................................................................................... 32 Cost Summary .................................................................................................... 34 Survey Data ........................................................................................................ 36 Appendix B: Access Compliance Survey Report of Sidewalk ............................368 2 City of Vernon 2020 ADA Transition Plan Table of Contents ..............................................................................................369 Navigation & Legend .........................................................................................370 Master Street List ..............................................................................................373 Cost Summary ...................................................................................................376 Survey Data .......................................................................................................390 Appendix C: Access Compliance Survey Report of Curb Ramps ....................1928 Table of Contents ............................................................................................1929 Navigation & Legend .......................................................................................1930 Cost Summary .................................................................................................1934 Survey Data .....................................................................................................1957 Appendix D: Access Compliance Survey Report of Pedestrian Signals ..........2268 Table of Contents ............................................................................................2269 Navigation & Legend .......................................................................................2270 Cost Summary .................................................................................................2273 Survey Data .....................................................................................................2282 Appendix E: Access Compliance Survey Report of Bus Stops ........................2433 Table of Contents ............................................................................................2434 Navigation & Legend .......................................................................................2435 Cost Summary .................................................................................................2438 Survey Data .....................................................................................................2443 Appendix F: Prioritization Criteria for Barrier Mitigation – PROW................... .2517 Table of Contents ............................................................................................2518 Definitions ........................................................................................................2519 Activity Score ...................................................................................................2521 Barrier Score ...................................................................................................2522 Priority Score ...................................................................................................2541 Appendix G: Prioritization Criteria for Barrier Mitigation – Facilities .................2542 Table of Contents .............................................................................................2543 Definitions .........................................................................................................2544 3 City of Vernon 2020 ADA Transition Plan Priority Score ...................................................................................................2545 Severity Score .................................................................................................2546 Appendix H: Public Input .................................................................................2547 Flyer ................................................................................................................2549 4 City of Vernon 2020 ADA Transition Plan SECTION I: EXECUTIVE SUMMARY INTRODUCTION: DEVELOPMENT OF ADA TRANSITION PLAN The Americans with Disabilities Act (ADA) of 1990 provides comprehensive civil rights protections to qualified individuals with disabilities in the areas of employment, public accommodations, State and local government services, and telecommunications. A primary goal of the ADA is to ensure equal participation in public life for all Americans with disabilities. Title II of the Act covers programs, services and activities of public entities, such as the City of Vernon. The ADA defines “disability” as: a. a physical or mental impairment that substantially limits one or more major life activities; b. having a record of such an impairment; or c. being regarded as having such an impairment. If an individual meets any one of these tests, they are considered to be an individual with a disability for purposes of the ADA. Under Title II, a public entity may not deny the benefits of its programs, services, and/or activities to individuals with disabilities by maintaining inaccessible facilities, which house these programs, services and activities. The City's programs, services, and activities, when viewed in their entirety, must be made accessible to and usable by individuals with disabilities, except where to do so would result in a fundamental alteration in the nature of the program; result in undue financial and administrative burdens or threaten or destroy the historic significance of a historic property. Section §35.150 requires that each program, service or activity conducted by a City, when viewed in its entirety, be readily accessible to and usable by individuals with disabilities. The regulation makes clear, however, that a City is not required to make each of its existing facilities accessible (§35.150(a)(1)). Unlike Title III of the ADA, which requires public accommodations to remove architectural barriers where such removal is "readily achievable," or to provide goods and services through alternative methods, where those methods are "readily achievable," Title II requires a City to make its programs accessible in all cases, except where to do so would result in a fundamental alteration in the nature of the program or in undue financial and administrative burdens. The US Congress intended the "undue burden" standard in Title II to be significantly higher than the "readily achievable" standard in Title III. Thus, although Title II may not require removal of barriers in some cases where removal would be required under Title III, the program access requirement of Title II 5 City of Vernon 2020 ADA Transition Plan should enable individuals with disabilities to participate in and benefit from the programs, services or activities of cities in all but the most unusual cases. To comply with the Title II requirements for accessibility to City programs, services and activities, this Transition Plan: • Evaluates existing policies, procedures and practices as they pertain to the City’s programs, services and activities; • Provides findings and recommendations with regard to policies, procedures and practices; • Identifies physical obstacles in the public entity's facilities that limit the accessibility of its programs or activities to individuals with disabilities; • Assesses the extent of architectural barriers to program accessibility in the public rights-of-way and within the buildings, parks and other facilities operated by the City; • Describes in detail the methods that will be used to make the facilities accessible; • Estimates costs for mitigation solutions; • Specifies the steps necessary to achieve compliance; • Provides a schedule for barrier removal/mitigation; • Sets priorities for barrier elimination; and • Indicates the official responsible for implementation of the plan. These are the four components of a Transition Plan, along with where they are located within this document: • Identify all physical barriers to access……………….…………………...……8 • Provide solutions to the barrier identified…………….………………………..8 • Create a mitigation schedule………………………………………………….19 • Designate an official responsible………………………………….………….16 6 City of Vernon 2020 ADA Transition Plan OVERVIEW: SELF-EVALUATION OF POLICIES, PROCEDURES AND PRACTICES In addition to identifying and modifying physical barriers, Title 28 CFR Part 35, Non- Discrimination on the Basis of Disability in State and Local Government Services, requires that a public entity evaluate its policies, procedures and practices. The following outlines the City’s Self-Evaluation: • Evaluate City policies, procedures, and practices as they pertain to its programs, services and activities; and make the necessary modifications to those policies and practices that do not meet the programmatic requirements of Title II of the ADA • Provide an opportunity to interested persons, including individuals with disabilities or organizations representing individuals with disabilities, to participate in the Self-Evaluation process by submitting comments • Maintain, file and make available for public inspection a list of interested persons consulted, a description of areas examined, and any problems identified, and a description of any modifications made It is recommended that the City periodically evaluate such policies, procedures and practices pertaining to communication, auxiliary aids and services, emergency response, publications, determination for undue burden, public activities, employment, and new construction of facilities, in addition to physical accessibility to City facilities. It is also recommended that for program barrier mitigation, a detailed outline of administrative requirements and detailed requirements of needed policies be included. The policy outline would serve as a guideline upon which the City's future policies may be built. An ADA Self-Evaluation Plan of City services, policies, and practices was completed in 2020. Please contact the City ADA Coordinator for further information regarding the “2020 City of Vernon ADA Self-Evaluation Plan”. 7 City of Vernon 2020 ADA Transition Plan OVERVIEW: ACCESS COMPLIANCE SURVEYS OF FACILITIES The ADA Transition Plan is used to document physical accessibility barriers to the City’s programs, services, and activities and to outline a schedule / plan (or the basis to produce one) for which the City shall follow to transition from a state of noncompliance to compliance. The access compliance surveys of City owned and leased facilities fulfill a portion of the first two requirements of an ADA Transition Plan by identifying existing building conditions that deviate from current State and Federal standards for new construction and providing detailed description of proposed solutions for barrier mitigation. For each barrier, the surveys outline the code deviations and requirements from the Americans with Disabilities Act Accessibility Guidelines (ADAAG), ADA Standards for Accessible Design (ADAS) and the Accessibility Standards in the California Building Standards Code (CBC). The access compliance surveys of City facilities cover approximately 7 owned and leased facilities maintained by the City. The surveys identified approximately 614 different accessibility related barriers within the City facilities and that the financial cost to mitigate all barriers identified in the surveys to be approximately $3.5 million. Number of Facilities Surveyed Number of Accessibility Barriers Total Cost Estimated ($) 7 614 $3,533,451 The City facilities that were surveyed are shown in the table below: Facility Number Facility Name Address City, State, Zip 00001 City Hall 4305 S Santa Fe Ave Vernon, CA 90058 00006 City Yard - Maintenance Building 1 4305 S Santa Fe Ave Vernon, CA 90058 00007 City Yard - Maintenance Building 2 4305 S Santa Fe Ave Vernon, CA 90058 00008 Power Plant Building Corner of 50th and Seville Vernon, CA 90058 00009 O.E. Clark Building 2716 Leonis Blvd Vernon, CA 90058 8 City of Vernon 2020 ADA Transition Plan 00010 Apartment Complex 3380 E 50th St Vernon, CA 90058 00011 City Parking Structure 4305 S Santa Fe Ave Vernon, CA 90058 Report Production The following information contains the minimum data included in the Transition Plan – Access Compliance Survey Reports: • Item number of barrier and/or room numbers, corresponding to schematic site and floor plans • Area/location of the barrier; for example, room name or number • Description of the barrier (as-built situation) • As-is measurement/dimension • Method of mitigation (e.g. physical alteration, purchase, program modification, equivalent facilitation, etc.) • Detailed description of proposed solution and, if applicable, an alternative or interim solution • Code citations, specifying the applicable sections in the State accessibility regulations, and in the Federal standards • Severity of individual barriers (four levels: 1=severe, 2=moderate, 3=mild 4=minor) • Unit and estimated unit price • Total estimated cost for barrier removal • Special site conditions (if applicable) The information obtained from the surveys of the City facilities is maintained on a Microsoft Excel spreadsheet database. Access Compliance Survey Reports are contained in Section II: Appendix. SEE Appendix A: Access Compliance Survey Report of Facilities 9 City of Vernon 2020 ADA Transition Plan Prioritization Criteria for Barrier Mitigation – Facilities The third requirement of an ADA Transition Plan is to create a schedule that the City shall follow which addresses the order in which barriers shall be mitigated. This schedule shall be a public document and shall be made available for public inspection, maintained, and updated for the duration of the Transition Planning period. The maintaining and updating of this document shall mark the City’s good-faith efforts in transitioning from a state of noncompliance to compliance regarding the ADA. The difficulty and complexity of creating a schedule is recognized. Therefore, to provide a methodology for creating a schedule, a prioritization criterion was formed to rank barriers in order of most important to mitigate first to least important. The prioritization criteria rates each barrier based on two factors, its Priority Score, and its Severity Score. The Priority Score ranks the relative importance of addressing the barrier based on its locational impact on the disabled population, and the Severity Score ranks the barrier based on the degree of deviation exhibited compared to applicable access standards. Overall Prioritization Criteria according to programmatic functions: ▪ Importance of the program function ▪ Frequency of Use ▪ Program location and relation to other programmatic functions ▪ Future Projects Since persons with disabilities utilize certain facilities with greater frequency than other facilities, the impact of barriers identified at those facilities was deemed to be greater. Upon compilation of the survey results, prioritization criteria were determined for barriers identified in the survey and additional information was obtained to determine a final level of prioritization. Prioritization Criteria according to barrier location: Priority can be further divided within any one facility depending on the function of the area within the facility being surveyed. Typically, these areas are divided into 4 general priorities. The prioritization criteria can be used to sort the access barriers identified in the surveys and create a schedule that order barrier mitigation work starting from barriers of highest importance to barriers of least importance. 10 City of Vernon 2020 ADA Transition Plan SEE Appendix G: Prioritization Criteria for Barrier Mitigation – Facilities Additional Consideration: Age of the Facility The age of the facility can also determine the City’s obligations to meet ADA compliance. Facilities built before September 15, 2010 are obligated to be in compliance with the 1991 ADAAG, barring that the building has not gone through major reconstruction or alteration henceforth that date. The facility will also be required to comply with the applicable California Building Codes (CBC) at the time of construction. If a facility was constructed or altered between the transition period of September 15, 2010 through March 15, 2012, an option of choosing either the 1991 ADA or 2010 ADA Standards were allowed. Facilities built after March 15, 2012 are required to meet the updated 2010 ADA Standards as well as the California Building Code (CBC) at time of construction. The caveat being that crucial program functions and services must be provided in accessible locations. Compliance Date for New Construction or Alterations Applicable Standards Before September 15, 2010 1991 Standards or UFAS On or after September 15, 2010, and before March 15, 2012 1991 Standards, UFAS, or 2010 Standards On or after March 15, 2012 2010 Standards 11 City of Vernon 2020 ADA Transition Plan OVERVIEW: ACCESS COMPLIANCE SURVEYS OF THE PUBLIC RIGHTS-OF-WAY Barden v. City of Sacramento, 292 F. 3d 1073 established that sidewalks and intersections constitute a service, program, or activity provided by a City, therefore they are subject to accessibility regulations and should be addressed as part of the City’s ADA Transition Plan. Four different features provided in the PROW were surveyed, including sidewalks, curb ramps, pedestrian signals and bus stops. Curb ramps, pedestrian signals and bus stops were surveyed using a data collection checklist, based on Accessibility Standards in the California Building Standards Code (CBC), Americans with Disability Act (ADA), Manual on Uniform Traffic Control Devices (MUTCD) and US Department of Transportation (USDOT) requirements as well as Public Rights-of-Way Accessibility Guidelines (PROWAG) recommendations. Traditional measuring and smart-level equipment were used to collect measurements for these surveys. Sidewalks were surveyed using sidewalk profilers that were developed for the Federal Highway Administration (FHWA) and adapted for sidewalk ADA surveys. The device captures information on slopes, and surface variations and identifies deviations from the required ADA standards and other applicable requirements. The access compliance surveys of the Public Rights-of-Way (PROW), along with the surveys of City owned and leased facilities, completely fulfill the first two requirements for an ADA Transition Plan. As a part of this effort, approximately 77 miles of sidewalk, 551 curb ramps, 260 pedestrian signals and 81 bus stops were surveyed for access compliance and that the financial cost to mitigate all barriers identified in the surveys to be approximately $181.5 million. Features Total Number Surveyed Number ADA Compliant Total Cost Estimate ($) Sidewalks 76.6 miles 39.7 miles $176,074,664 Curb Ramps 551 curb ramps 5 curb ramps $3,379,000 Pedestrian Signals 260 pedestrian signals 0 pedestrian signals $1,931,250 Bus Stops 81 bus stops 15 bus stops $168,500 TOTAL $181,553,414 The information obtained from the surveys of the PROW is maintained on a geographic information system (GIS) database and MS Excel database. 12 City of Vernon 2020 ADA Transition Plan Access Compliance Survey Reports are contained in Section II: Appendix. SEE Appendix B: Access Compliance Survey Report of Sidewalks SEE Appendix C: Access Compliance Survey Report of Curb Ramps SEE Appendix D: Access Compliance Survey Report of Pedestrian Signals SEE Appendix E: Access Compliance Survey Report of Bus Stops Prioritization Criteria for Barrier Mitigation – Public Rights-of-Way The third requirement of an ADA Transition Plan is to create a schedule that the City shall follow which addresses the order in which barriers within each feature shall be mitigated. This schedule shall be a public document and shall be made available for public inspection, maintained, and updated for the duration of the Transition Planning period. The maintaining and updating of this document shall mark the City’s good-faith efforts in transitioning from a state of noncompliance to compliance regarding accessibility. The difficulty and complexity of creating a schedule is recognized. Therefore, to provide a methodology for creating a schedule, like City owned and leased facilities, a prioritization criterion was formed, catered to the in-depth information that is provided utilizing GIS. The relative importance of each barrier, according to its impact upon the disabled population was taken into account when developing the prioritization criteria for barrier mitigation. Overall Prioritization Criteria according to programmatic functions: ▪Importance of the program function ▪Frequency of Use ▪Program location and relation to other programmatic functions Since persons with disabilities utilize certain facilities with greater frequency than other facilities, the impact of barriers identified at those facilities was deemed to be greater. Upon compilation of the survey results, prioritization criteria was determined for barriers identified in the survey and additional information was obtained to determine a final level of prioritization. The general policy includes the continuous effort of providing connection to existing pedestrian facilities where sidewalk segments are missing. 13 City of Vernon 2020 ADA Transition Plan Prioritization Criteria for PROW according to barrier location: ▪Government Services ▪City Attractors (City Owned/Leased Facilities) ▪Schools ▪Parks ▪Transit Stops/Centers ▪Population Density ▪Streets (Arterials, Collectors) The prioritization criteria developed for the PROW rates the relative importance of each barrier based on a combination of rating the activity occurring at the barrier’s location, or “Activity Score”, as well as rating the severity from which each feature deviates from current State and Federal standards, or “Barrier Score”. Each score is rated on a scale of 0 to 100, with 0 being the lowest, and 100 being the highest. The combination of both the “Activity Score” and “Barrier Score” creates an overall “Priority Score” that can be used to sort features identified in the surveys and create a schedule that orders barrier mitigation work starting from features of highest priority to features of lowest priority. The “Priority Score” is rated on a scale of 0 to 200, with 0 being the lowest priority, and 200 being the highest priority. SEE Appendix F: Prioritization Criteria for Barrier Mitigation – Public Rights-of- Way Additional Consideration: Age of PROW The age of the PROW element (i.e. sidewalk, curb ramp, pedestrian signal, or bus stop) can also determine the City’s obligations to meet ADA compliance. PROW elements built before September 15, 2010 are obligated to be in compliance with the 1991 ADAAG, barring that the element has not gone through major reconstruction or alteration henceforth that date. The element will also be required to comply with the applicable California Building Codes (CBC) at the time of construction. If a PROW element was constructed or altered between the transition period of September 15, 2010 through March 15, 2012, an option of choosing either the 1991 ADA or 2010 ADA Standards were allowed. PROW elements built after March 15, 2012 are required to meet the updated 2010 ADA Standards as well as the California Building Code (CBC) at time of construction. 14 City of Vernon 2020 ADA Transition Plan The caveat being that crucial program functions and services must be provided in accessible locations. Compliance Date for New Construction or Alterations Applicable Standards Before September 15, 2010 1991 Standards or UFAS On or after September 15, 2010, and before March 15, 2012 1991 Standards, UFAS, or 2010 Standards On or after March 15, 2012 2010 Standards 15 City of Vernon 2020 ADA Transition Plan OFFICIAL(S) RESPONSIBLE The ADA requires that an official be identified as responsible for the implementation of the Entity’s plan. It is the US DOJ's view that compliance with 28 CFR 35.150(a), like compliance with the corresponding provisions of the section 504 regulations for public programs, would in most cases not result in undue financial and administrative burdens on a typical City. In determining undue financial and administrative burdens, all City resources available for use in the funding and operation of City services, programs and activities would need to be considered. The burden of proving that compliance with paragraph (a) of 28 CFR 35.150 would either fundamentally alter the nature of a service, program, or activity OR would result in undue financial and administrative burdens rests with the City. The decision that compliance would result in such alteration and/or burden must be made by the head of the public entity or their designee and must be accompanied by a written statement of the reasons for reaching that conclusion. While the US DOJ has acknowledged the difficulty/complexity of not only making such a determination, but also identifying the official responsible to make this decision/determination, the department's intention is clear in that the determination must be made by a high level official, no lower than a Department head, having budgetary authority and responsibility for making spending decisions. The Official Responsible for the implementation should be able to seek/acquire funding for ADA barrier removal work over the City’s Transition Planning period. In most cities, it is the Department Head who can effectively control the City’s budget line item – “ADA Transition Planning budget”. As such, the City of Vernon will designate the Department Head as the Official Responsible for the implementation of its ADA Transition Plan who can be contacted as follows: For Facilities and Public Rights-of-Way: Director of Public Works City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323) 583-8811 California Relay, 711 16 Typically, the responsibility of making any particular City program, service or activity accessible to all persons, regardless of ability, rests with the official who controls the operating funds for that particular program, service or activity. To this end, the task of seeking/getting approval for funds from the governing body to make the said program accessible lies with the official responsible for the program. Indication of the official(s) responsible for implementation of the plan fulfills the final requirement of a Transition Plan. 17 City of Vernon 2020 ADA Transition Plan PUBLIC INPUT Per 28 Code of Federal Regulations, Part 35; Subpart D – Program Accessibility; §35.150 – Existing Facilities; (d) Transition Plan (1): The City shall provide an opportunity to interested persons, including individuals with disabilities or organizations representing individuals with disabilities, to participate in the development of the ADA Self-Evaluation and Transition Plan by submitting comments. In order to satisfy this requirement and to gain the perspective of persons with disabilities, the City sent out flyers between September 14, 2020 and September 21, 2020, where members of the public were invited to comment on and participate in the City’s Draft ADA Self-Evaluation & Transition Plan. Public comments were due October 1, 2020. SEE Appendix H: Public Input 18 City of Vernon 2020 ADA Transition Plan TRANSITION PLAN IMPLEMENTATION The document should be maintained and updated for the duration of the Transition Planning period and a copy of the Transition Plan shall be made available upon request. The final product is a working document to be modified as barriers are removed or alterations are made, open to modification throughout the transition period. The Official(s) responsible and project managers overseeing the barrier-removal projects will document all such ADA improvements/upgrades. Also as part of this process, technical infeasibility, if any, to meet necessary accessibility compliance will be documented and filed for the City’s records by the Engineer-of-Record on the said project. It is also recommended to provide accessibility site audits (inspections) of on-going projects as part of the project close-out/certification. This documentation and verification of barrier- mitigation will be integrated into the City’s ADA Transition Plan on a regular basis to ensure that barriers are “checked-off” and the Plan is current with a record of barrier- mitigation work. Annual reports of barrier-mitigation work may also be provided to the City’s Board of Supervisors. Maintenance of Accessible Features The Maintenance of accessible features is mandated by State and Federal Regulations and is an integral part of the City’s plan to transition into a more accessible destination. Both, Chapter 28 Code of Federal Regulation, Part 35, Section 35.133 as well as the California Building Code section 1101B.3 – Maintenance of accessible features, state: 1.A public accommodation shall maintain in operable working condition those features of facilities and equipment that are required to be accessible to and usable by persons with disabilities. 2.This section does not prohibit isolated or temporary interruptions in service or access due to maintenance or repairs. Both these sections provide that a public entity shall maintain in operable working condition those features of facilities and equipment that are required to be accessible to and usable by persons with disabilities. They require that, to the maximum extent feasible, facilities must be accessible to, and usable by, individuals with disabilities. These sections recognize that it is not sufficient to provide features such as accessible routes, ramps, or elevators, if those features are not maintained in a manner that enables individuals with disabilities to use them. Inoperable elevators, are neither "accessible to" nor "usable by" individuals with disabilities. It is, of course, impossible to guarantee that mechanical devices will never fail to operate. As such, the 2nd paragraph provides that this section does not prohibit isolated 19 City of Vernon 2020 ADA Transition Plan or temporary interruptions in service or access due to maintenance or repairs. This paragraph is intended to clarify that temporary obstructions or isolated instances of mechanical failure would not be considered violations of the ADA or this part. However, allowing obstructions or "out of service" equipment to persist beyond a reasonable period of time would violate this part, as would repeated mechanical failures due to improper or inadequate maintenance. Failure of the public entity to arrange prompt repair of inoperable elevators or other equipment intended to provide access would also violate this part. A City-wide formal policy specifically addressing the legal requirements (28CFR Part 35.133 & CBC1101B.3) of maintaining accessible features would be of long-term benefit to the City. When, over time, an accessible feature fails, institutionalizing organizational commitments towards protocols and maintenance ensures an appropriate action is taken. Implementation Policies The City of Vernon proposes the following implementation policies for transition of its facilities and public rights-of-way into compliance with the ADA. 1)The City will continue to seek out sources of funding, including funds associated with the City’s Capital Improvement Project funds, and other Tenant Improvement projects. 2)The City will continue to seek out a variety of grants to assist in ADA mitigation each year. 3)Where projects in the City’s pipeline are identified whose scope of work overlaps with the location of access barriers identified in the Access Compliance Survey, the City shall ensure that the project incorporate the mitigation of the corresponding barriers. The project and completion of mitigation work shall be appropriately documented in the corresponding inventory. 4)In addition to the improvements to facilities, curb ramps and traffic signals, the City will continue to perform work on an ongoing, routine basis related to maintaining the ramps, sidewalks, bridges, etc. so they are in good condition. Many of these maintenance tasks are beneficial to the disabled population, for example, by reducing trip hazards and keeping sufficient accessible space along sidewalks. Examples of work undertaken include trimming shrubbery; repairing or grinding sidewalks; ramping raised sidewalks; filling holes; weeding and cleanup 20 City of Vernon 2020 ADA Transition Plan of debris; sweeping; repairing tree grates; inspections for needed sidewalk repairs. Existing Policies and/or Standards: 1)The City prioritizes complaints from the public about barriers and moves to mitigate them in a timely manner. 2)The City ensures all construction, in the public rights-of-way, is built according to the standards the City has identified. The following are the City’s current standards: a.2018 Standard Plan A88A - Curb Ramp Details b.Standard Plan PV 693 - Standard Driveway c.Standard Plan PV 582 - Standard Sidewalk, Curb, and Gutter d.Standard Plan PV 2133 - Standard Offset Requirements 21 City of Vernon 2020 ADA Transition Plan NOTICE OF COMPLIANCE UNDER ADA & CALIFORNIA STATE LAW In accordance with the requirements of Title II of the Americans with Disabilities Act (ADA) of 1990, the Americans with Disabilities Amendments Act of 2008, the Fair Employment & Housing Act (FEHA), California Government Code Section 11135 and other applicable codes, the City does not discriminate against individuals on the basis of disability in its services, programs or activities. Employment: The City does not discriminate on the basis of disability in its hiring or employment practices and will comply with the Fair Employment and Housing Act, as well as Title I of the ADA, including the regulations promulgated by the U.S. Equal Employment Opportunity Commission (EEOC), including the requirement to provide reasonable accommodations. Effective Communication: The City will generally, upon request, provide appropriate aids and services leading to effective communication for qualified person(s) with disabilities, including sign language interpreters, documents in Braille and other alternate formats to ensure information and communication is accessible to people who have speech, hearing, vision, or cognitive impairments so they can participate equally in the programs, services and activities. Modification to Policies and Procedures: The City will make reasonable modifications to policies and programs to ensure that people with disabilities have an equal opportunity to participate in all of its programs, services and activities. For example, individuals with service animals behaving within applicable standards are welcome in offices and City facilities, even when pets are generally prohibited. Anyone who requires auxiliary aids and services for effective communication, or a modification of policies or procedures to participate in a program, service or activity in the City should communicate with the responsible Department contact as soon as possible, but no later than 48 hours before the scheduled event. Neither the ADA, nor State law requires the City to take action that would fundamentally alter the nature of its programs, activities or services or impose an undue financial or administrative burden. Complaints that a program, activity or service of the City is not accessible should be directed to the ADA Coordinator: Director of Human Resources City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323) 583-8811 22 City of Vernon 2020 ADA Transition Plan California Relay, 711 The City does not place a surcharge on a particular individual with a disability or a group of individuals with disabilities to cover the cost of providing auxiliary aids and services or making a reasonable modification to a policy to create access. 23 City of Vernon 2020 ADA Transition Plan ADA GRIEVANCE PROCEDURE City of Vernon ADA Grievance Procedure Grievance Procedure under ADA and California State Disability Rights Laws This grievance procedure is established to meet the requirements of the Americans with Disabilities Act of 1990 (“ADA”), the Americans with Disabilities Amendments Act (ADAAA) and California State law. It may be used by anyone wishing to file a complaint alleging discrimination on the basis of disability in the provision of services, activities, programs or benefits by the City of Vernon. The City’s Disability Discrimination Policy and grievance procedures govern employment-related complaints of disability discrimination. The complaint should be in writing and contain information about the alleged discrimination such as name, address, phone number of the complainant and location, date and a description of the problem(s). Alternative means of filing a complaint, such as personal interviews or tape recording the complaint, are available to people with disabilities upon request. The complaint should be submitted by the grievant and/or their designee as soon as possible, but no later than 60 calendar days after the alleged violation to: Director of Human Resources City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323) 583-8811 California Relay, 711 Within 15 calendar days after receipt of the complaint, the ADA Coordinator or his/her designee will schedule a meeting with the complainant to discuss the complaint and possible resolutions. After an investigation and review the ADA Coordinator will respond in writing, and, where appropriate, in a format accessible to the complainant. The response will explain the City position on the issue and offer options for substantive resolution of the complaint. If the response by the ADA Coordinator does not satisfactorily resolve the issue, the complainant and/or their designee may appeal the decision within 15 calendar days after receipt of the response to the City Administrator or their designee. 24 City of Vernon 2020 ADA Transition Plan After receiving the appeal, the City Administrator or their designee will review the appeal and the ADA Coordinator finding. Within a reasonable period, after a review, the City Administrator or their designee will respond in writing, and, where appropriate in a format that is accessible to the complainant, with a final resolution to the complaint. All written complaints received by the ADA Coordinator or their designee, appeals to the City Administrator or their designee, and responses from these two offices will be retained by the City for at least three years. 25 City of Vernon 2020 ADA Transition Plan SECTION II: APPENDIX A. Access Compliance Survey Report of Facilities………………….27 B. Access Compliance Survey Report of Sidewalks……………….368 C. Access Compliance Survey Report of Curb Ramps……………1928 D. Access Compliance Survey Report of Pedestrian Signals……2268 E. Access Compliance Survey Report of Bus Stops………………2433 F. Prioritization Criteria for Barrier Mitigation – Public Rights-of- Way……………………………………………………………………………2517 G. Prioritization Criteria for Barrier Mitigation – Facilities………2542 H. Public Input……………………………………………………………2547 26 Access Compliance Survey Report Appendix A: Facilities City of Vernon City of Vernon - Facilities October 2020 SSA Project # 19033 27 October 2020 SSA Project # 19033 City of Vernon - Facilities - ACS Report TABLE OF CONTENTS I. Cover & Table of Contents i. Report Navigation and Legend Abbreviations ii. Cost Summary II. Facilities List III. Survey Data for Facilities 28 October 2020 SSA Project # 19033 City of Vernon - Facilities - ACS Report NAVIGATION & LEGEND 29 October 2020 SSA Project # 19033 City of Vernon - Facilities - ACS Report NAVIGATION 1. Item Number: Number corresponding to the number on the Barrier Location Map which identifies the general location of the identified barriers. 2. Item Name: Describes the barrier location / item title (e.g.: parking lot, room name). 3. As-Built Description: Description of identified barrier based on applicable accessibility codes. 4. As-Built: Existing conditions / dimensions. 5. Proposed Solution: Description of steps necessary to remove barrier and, if applicable, an interim or alternative solution. 6. Notes: Additional notes pertaining to barrier. 7. Codes / Info: - PCODE: specifies the relevant SSA database code. Database code plus suffix: - REF: data shown for reference only [scope of work related to or covered by other item]. - NT: non-typical problem or solution. - ADAAG, ADA 2010, PRoW and CBC 2019: The Federal Standard for accessibility adopted by the Department of Justice. 8. Qty: Number of units required. 9. Type: Unit of measurement used to compute conceptual cost estimate. LF=linear feet; SF=square feet; JOB=lump sum. 10. Cost: Estimated conceptual cost of specific solution per one unit. 11. Total: Total estimated conceptual cost for removing identified barrier (multiplied Qty by Cost). 12. ID No: Specifies Facility Number, Area Number: 1=Interior / 0=Exterior, and Part / Floor Number. 7653 921 11 124810 30 October 2020 SSA Project # 19033 City of Vernon - Facilities - ACS Report ABA Architectural Barriers Act ADA Americans with Disability Act ADAAG ADA Accessibility Guidelines ADACO ADA-Coordinator AED Automated External Defibrillators AFF Above finished floor BCS Baby Changing Station CA State of California CSAS CA State Accessibility Standards ANSI American National Standards Institute C.T.P. Contact third party cl Center Line D.A. Designated accessible DCS Diaper changing station DF Drinking fountain Dir. Director E.F. Equivalent facilitation EHD Electric Hand Drier FC Fire Chief FD Finance Director FDC Facilities Design & Construction FHAAG Fair Housing Act Accessibility Guidelines Fig. Figure FM&O Facilities, Maintenance & Operations FND Feminine napkin disposal FTD Feminine Tissue Dispenser Gov. Government HQ Headquarters HWB Hazardous waste bin IBC International Building Code ICC International Code Council ISA International Symbol of Accessibility JOB per one job (lump sum) Lav Lavatory lbs Pounds LF Linear foot Lib Library MOD Modernization project MoM Method of mitigation MP Master priority MRR Men’s restroom N.A.R. No action required NT Non-typical o.c. On center O/R Official responsible P.A. Physical alteration P.M. Program modification POM Plant Operations & Maintenance POT Path of travel PROW Public Right-of-Way PTD Paper towel dispenser PW Public Works Qty Quantity REF Reference RGB Rear grab bar SCD Seat cover dispenser SD Soap dispenser sec. Second SF Square foot SGB Side grab bar tbd To be determined TPD Toilet paper dispenser UFAS Uniform Federal Accessibility Standards WC Water closet WRR Women’s restroom WT Water treatment facility WWT Waste water treatment facility ABBREVIATIONS 31 October 2020 SSA Project # 19033 City of Vernon - Facilities - ACS Report FACILITIES LIST 32 Facility#:Facility:Address: Access Compliance Survey Report Facility ListCity of Vernon 1 City Hall 4305 S Santa Fe Ave 6 City Yard - Maintenance Building 1 4305 S Santa Fe 7 City Yard - Maintenance Building 2 4305 S Santa Fe 8 Power Plant Building Corner of 50th and Seville 9 O.E. Clark Building 2716 Leonis Blvd 10 Apartment Complex 3380 E 50th St 11 City Parking Structure 4305 S Santa Fe Ave October 2020 S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #19033.00 33 October 2020 SSA Project # 19033 City of Vernon - Facilities - ACS Report COST SUMMARY 34 Facility # & Name Access Compliance Survey Report Cost Summary (By Fac/Floor)City of Vernon Interior/Exterior Floor CostID $1,808,676.00City Hall1 On-site $68,100.00Exterior1-0-1 Basement $356,805.00Interior1-1-0 First Floor $887,835.00Interior1-1-1 Second Floor $423,441.00Interior1-1-2 Third Floor $72,495.00Interior1-1-3 $96,600.00City Yard - Maintenance Building 16 On-site $4,200.00Exterior6-0-1 First Floor $92,400.00Interior6-1-1 $190,185.00City Yard - Maintenance Building 27 First Floor $190,185.00Interior7-1-1 $496,176.00Power Plant Building8 On-site $30,951.00Exterior8-0-1 Basement $23,520.00Interior8-1-0 First Floor $441,705.00Interior8-1-1 $526,341.00O.E. Clark Building9 On-site $23,850.00Exterior9-0-1 First Floor $502,491.00Interior9-1-1 $110,523.00Apartment Complex10 On-site $110,523.00Exterior10-0-1 $155,115.00City Parking Structure11 On-site $117,915.00Exterior11-0-1 On-site $37,200.00Interior11-1-1 Grand Total for $3,383,616.00City of Vernon October 2020 S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t #19033.00 35 October 2020 SSA Project # 19033 City of Vernon - Facilities - ACS Report SURVEY DATA 36 City Hall 4305 S Santa Fe Ave Access Compliance Survey Report City of Vernon October 2020 SSA Project #:19033.00 1Facility #: 37 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. Sally Swanson Architects San Francisco, CA Item Number 19040 8-27-2020 1-0-1 4305 S. SANTA FE AVE VERNON, CA 90058 CITY HALL 1-0-1 City Hall Exterior- On-Site 4 1 3 5 2 38 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 1-1-0 Interior- Basement 4305 S. SANTA FE AVE VERNON, CA 90058 CITY HALL City Hall1-1-0 6 1 2 3 7 4 5 39 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 1-1-1 Interior- First Floor 4305 S. SANTA FE AVE VERNON, CA 90058 CITY HALL City Hall1-1-1 8 3 11 14 10 9 15 2 6 1 16 17 13 17 7 4 5 40 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 1-1-2 Interior- Second Floor 4305 S. SANTA FE AVE VERNON, CA 90058 CITY HALL City Hall1-1-2 9 1 13 14 12 16 15 16 11 10 8 20 19 3 2 18 17 7 6 5 4 41 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 1-1-2E Interior- Second Floor Floor 4305 S. SANTA FE AVE VERNON, CA 90058 CITY HALL City Hall- East Wing1-1-2E 7 2 1 6 15 8 14 12 11 5 4 13 9 10 3 42 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 1-1-3 Interior- Third Floor 4305 S. SANTA FE AVE VERNON, CA 90058 CITY HALL City Hall1-1-3 8 6 7 10 5 11 3 9 1 2 4 43 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Police Entrance1 Staff Only Door Swing $15,0001 $15,000JOB 57" from face of door to sloped area ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 515 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Door Swing REF Door width plus 21" to wall ID23CREFPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 516 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 44 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Reach Range $3001 $300JOB 57" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 517 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Walk $75100 $7,500SF 7.2% direction of travel EF01PCODE 4.3.7ADAAG 91 Walk: Slope greater than 1:20 (5.0%), and walk does not comply with requirements for ramps. Modify walk/sidewalk slope to 1:20 or less. • As-Built Description: • Proposed Solution: • As-Built: 514 403.3ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 45 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site General Path of Travel2 Staff Only Accessible Route $7530 $2,250SF 3.0% EF07PCODE 4.3.7ADAAG 91 Cross slope more than 1":48" (2.083%). Modify cross slope. • As-Built Description: • Proposed Solution: • As-Built: 520 403.3ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Fixed Bench $1,5001 $1,500JOB 16" high seat. NO06APCODE 4.37.5ADAAG 91 Seat front edge height is not between 17" min. to 19" max. above ground of floor space. Provide new compliant bench with accessible dimensions. • As-Built Description: • Proposed Solution: • As-Built: 518 903.5ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 46 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Fixed Bench $1,5001 $1,500JOB No clear space adjacent to bench. NO07PCODE 4.32.2ADAAG 91 Clear and level floor or ground space (30" x 48") not overlapping with other clear space requirements, is not provided at at least one end of the bench. Provide and position a clear and level floor or ground space to allow wheelchair users to be seated shoulder-to-shoulder with an individual seated on the bench. • As-Built Description: • Proposed Solution: • As-Built: 519 903.2ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Vertical Clearance $1,5001 $1,500JOB 72" high EG01PCODE 4.4.2ADAAG 91 Overhead clearance less than 80" above finished floor. Modify overhead clearance. • As-Built Description: • Proposed Solution: • As-Built: 521 307.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 47 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Ramp to Entrance3 Staff Only Curb or Barrier $5150 $2,550LF No wheel guide EB14PCODE 4.8.7ADAAG 91 No curb (2" minimum height) or wheel guide (barrier shall be provided that prevents the passage of a 4" diameter sphere) at sides of ramp. Provide 2" minimum curb or wheel guide. • As-Built Description: • Proposed Solution: • As-Built: 524 405.9.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Height $22550 $11,250LF 32" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 523 505.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 48 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Top and Bottom Extension at Ramps 4 REF 8" parallel to ground. ED05REFPCODE 4.8.5(2)ADAAG 91 Ramp handrail does not extend horizontally 12" past top and / or bottom of ramp. Provide ramp handrail extension (cost for each extension piece). • As-Built Description: • Proposed Solution: • As-Built: 522 505.10.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 49 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Stairs to Entrance4 Staff Only Height $22530 $6,750LF 33" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 526 505.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Top & Bottom Extension at Stairs 6 REFED06REFPCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 525 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 50 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Tread Surface $27100 $2,700LFEC02PCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide contrasting color strips at all exterior stair treads. • As-Built Description: • Proposed Solution: 527 504.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 51 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Employee Entrance5 Staff Only Door $3001 $300JOBID06PCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Provide 10" min. "kick plate" covering width of door when altering area. • As-Built Description: • Proposed Solution: 530 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Swing $15,0001 $15,000JOB Door width plus 14" to rocks ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 529 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 On-site $68,100.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 52 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-0-1 City Hall Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Exterior $68,100.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 53 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Men's Restroom1 Staff Only Corridor $1501 $150JOB 31" wide to locker IH03APCODE 4.3.3ADAAG 91 Corridor, for occupant load less than 10, less than 36" wide. Remove or relocate furniture and storage items. • As-Built Description: • Proposed Solution: • As-Built: 207 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Door Clearance $7,8001 $7,800JOB 29" wide ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 206 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 54 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Door Swing $15,0001 $15,000JOB 7" strike ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 205 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Fixed Bench $1,5001 $1,500JOBNO07PCODE 4.32.2ADAAG 91 Clear and level floor or ground space (30" x 48") not overlapping with other clear space requirements, is not provided at at least one end of the bench. Provide and position a clear and level floor or ground space to allow wheelchair users to be seated shoulder-to-shoulder with an individual seated on the bench. • As-Built Description: • Proposed Solution: 21 903.2ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Reach Range $3001 $300JOB 52" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 208 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 55 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Reach Range $3001 $300JOB 67" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 450 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Restroom ?1 $105,000JOBWA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: 209 603.1ADA 2010 Mitigated: YES NO SeverityPriority 3 1 Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 204 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 56 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Women's Locker Room2 Staff Only Accessories $2251 $225JOB Behind water closet WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 16 604.7ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Fixed Bench $1,5001 $1,500JOBNO02PCODE 16.12.1ADAAG 91 Single fixed bench provided is not accessible. Provide additional accessible bench or replace. • As-Built Description: • Proposed Solution: 210 903.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 57 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Grab Bars $1,0201 $1,020JOB Extends 21" from center line of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 214 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Lavatory $4,5001 $4,500JOB Knee space: 28" high WD04APCODE Fig. 31ADAAG 91 Knee clearance 27" min. high starting 8" back from the front edge of the lavatory towards the wall is not provided. Remount compliant fixture to accessible height. • As-Built Description: • Proposed Solution: • As-Built: 211 306.3.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Shower $12,0001 $12,000JOBWF01PCODE 4.21ADAAG 91 Shower not accessible; multiple compliance violations. Provide accessible shower. • As-Built Description: • Proposed Solution: 212 608.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 58 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Toilet Stall $4,5001 $4,500JOB 51" long to door 69" in front of stall WB03PCODE 4.17.3ADAAG 91 Less than 59" from back wall to front wall or door swing of toilet stall, or less than 56" if water closet is wall-hung. Provide new enclosure at existing water closet fixture. • As-Built Description: • Proposed Solution: • As-Built: 213 604.8.1.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 59 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Supervisor's Men's Restroom3 Staff Only Door Hardware $7501 $750JOBID07PCODE 4.13.9ADAAG 91 Door does not have accessible operating hardware. Provide lever handle or other accessible hardware. • As-Built Description: • Proposed Solution: 215 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Drinking Fountain $6,0001 $6,000JOBIA01APCODE 4.1.3(10)(a)ADAAG 91 Where only one drinking fountain is provided per floor: Fountain is not accessible to individuals who use wheelchairs, or to those who have difficulty bending or stooping. Provide additional fountain or hi-lo combination fountain. • As-Built Description: • Proposed Solution: 221 211.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 60 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Drinking Fountain $1,5001 $1,500JOBIA05CPCODE 4.4.1ADAAG 91 Drinking fountain lacks protection for visually impaired persons. Provide cane-detectable rails. • As-Built Description: • Proposed Solution: 10 307.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Grab Bars $1,0201 $1,020JOB Extends 21" WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 219 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Shower $12,0001 $12,000JOBWF01PCODE 4.21ADAAG 91 Shower not accessible; multiple compliance violations. Provide accessible shower. • As-Built Description: • Proposed Solution: 217 608.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 61 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Toilet Stall $4,5001 $4,500JOB 48" long partition, 63" in front of toilet WB03PCODE 4.17.3ADAAG 91 Less than 59" from back wall to front wall or door swing of toilet stall, or less than 56" if water closet is wall-hung. Provide new enclosure at existing water closet fixture. • As-Built Description: • Proposed Solution: • As-Built: 218 604.8.1.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 62 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Briefing Room4 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 223 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Non-Fixed Desk $4,8001 $4,800JOB Knee space: 14" deep IN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: • As-Built: 222 306.1ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 63 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Vertical Clearance $1,5001 $1,500JOB 46" high EG01PCODE 4.4.2ADAAG 91 Overhead clearance less than 80" above finished floor. Modify overhead clearance. • As-Built Description: • Proposed Solution: • As-Built: 224 307.4ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 64 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Break Room5 Staff Only Cooktops $1,9501 $1,950JOBKF15PCODE 13.3.4(6)ADAAG 91 Cooktop controls require reaching across the burners. Provide cooktop with accessible controls. • As-Built Description: • Proposed Solution: 226 804.6.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Non-Fixed Desk $4,8001 $4,800JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 228 306.1ADA 2010 Due to base. • Notes: Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 65 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Reach Range $3001 $300JOB 65" high IE02PCODE 4.2.6ADAAG 91 Reach height to control or access point, where side approach is available, exceeds 48" or is less than 15" in height, or exceeds 10" in depth. Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 227 308.3.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Reach Range $3001 $300JOB PTD: 57" high IE02PCODE 4.2.6ADAAG 91 Reach height to control or access point, where side approach is available, exceeds 48" or is less than 15" in height, or exceeds 10" in depth. Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 229 308.3.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Sink $5,2501 $5,250JOB Top: 36" high IN06PCODE 4.24.2ADAAG 91 Sink rim higher than 34" above floor. Remodel sink cabinet to lower sink. • As-Built Description: • Proposed Solution: • As-Built: 11 606.3ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 66 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Sink $5,2501 $5,250JOB Knee space: none IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 225 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 67 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Tactical Locker6 Staff Only Door $9001 $900JOB 46" high ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 235 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Door Clearance $7,8002 $15,600JOB 27" wide ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 232 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 68 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Door Swing $15,0001 $15,000JOB 44" deep ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 231 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Drinking Fountain $6,0001 $6,000JOBIA01APCODE 4.1.3(10)(a)ADAAG 91 Where only one drinking fountain is provided per floor: Fountain is not accessible to individuals who use wheelchairs, or to those who have difficulty bending or stooping. Provide additional fountain or hi-lo combination fountain. • As-Built Description: • Proposed Solution: 237 211.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Drinking Fountain $1,5001 $1,500JOBIA05CPCODE 4.4.1ADAAG 91 Drinking fountain lacks protection for visually impaired persons. Provide cane-detectable rails. • As-Built Description: • Proposed Solution: 12 307.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 69 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Fixed Bench $1,5001 $1,500JOBNO07PCODE 4.32.2ADAAG 91 Clear and level floor or ground space (30" x 48") not overlapping with other clear space requirements, is not provided at at least one end of the bench. Provide and position a clear and level floor or ground space to allow wheelchair users to be seated shoulder-to-shoulder with an individual seated on the bench. • As-Built Description: • Proposed Solution: 236 903.2ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Height $22530 $6,750LF 31" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 239 505.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Reach Range $3001 $300JOB 53" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 234 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 70 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Restroom ?1 $105,000JOBWA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: 233 603.1ADA 2010 Mitigated: YES NO SeverityPriority 3 1 Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 230 Mitigated: YES NO SeverityPriority 3 3 Top & Bottom Extension at Stairs 2 REFED06REFPCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 238 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 71 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-0 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Basement Basement $356,805.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 72 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor General0 Staff Only Electrical $9001 $900JOB All switches 53" high IC01PCODE 4.2.5 & 6ADAAG 91 Electric switch or control mounted less than 15" measured to the bottom of the outlet box or greater than 48 inches measured to the top of the outlet box. Relocate light switches or control to between 15" and 48" height. • As-Built Description: • Proposed Solution: • As-Built: 4 308.2.1 & 308.2.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Electrical $9001 $900JOB 9" high to bottom IC01PCODE 4.2.5 & 6ADAAG 91 Electric switch or control mounted less than 15" measured to the bottom of the outlet box or greater than 48 inches measured to the top of the outlet box. Relocate light switches or control to between 15" and 48" height. • As-Built Description: • Proposed Solution: • As-Built: 5 308.2.1 & 308.2.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 73 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Lobby1 Staff Only Door $1205 $600SF 2.8% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 10 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Door Closer $1,1251 $1,125JOB 3 seconds ID03APCODE 4.13.10 &11ADAAG 91 Excessive force required to open door and/or door closing time of less than 5 seconds. Provide new door closer adjusted to accessible standards. • As-Built Description: • Proposed Solution: • As-Built: 7 404.2.8 & 404.2.9ADA 2010 Main entrance • Notes: Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 74 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Door Threshold $7501 $750JOB 0.5" high vertical ID02PCODE 4.1.6(3)(d)(ii)ADAAG 91 Existing threshold at door is 1/2" high or less but without a beveled edge on both sides. Modify threshold to have beveled edge on each side. • As-Built Description: • Proposed Solution: • As-Built: 8 404.2.5ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Doormat $1,5002 $3,000JOBID05PCODE 4.5.3ADAAG 91 Doormat hinders access to disabled persons. Provide new doormat; recess or attach at edges. • As-Built Description: • Proposed Solution: 6 302.2ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Drinking Fountain $9,6001 $9,600JOB Knee space: 26.5" high IA02PCODE 4.15.5(1)ADAAG 91 Wall- and post-mounted cantilevered units: Knee space not provided at drinking fountain (27" high, 8" deep, 30" wide from front of drinking fountain). Provide new, accessible fountain. • As-Built Description: • Proposed Solution: • As-Built: 15 602.2ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 75 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Drinking Fountain $1,5001 $1,500JOBIA05CPCODE 4.4.1ADAAG 91 Drinking fountain lacks protection for visually impaired persons. Provide cane-detectable rails. • As-Built Description: • Proposed Solution: 16 307.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Fire Alarm $8252 $1,650JOB 49"-51" high IC03PCODE 4.2.5ADAAG 91 Fire alarm pull stations not 42"-48" from floor to center. Note: Required only at new construction, or where mounting location was or is to be remodeled. Remount fire alarm station to be 42" min., and 48" max. from floor to center. • As-Built Description: • Proposed Solution: • As-Built: 3 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Public Counter $6,0001 $6,000JOB Lowered counter 34" high by 32" long IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 13 904.4ADA 2010 No pass through within reach range • Notes: Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 76 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Reach Range $3001 $300JOB 56" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 9 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Reach Range $3001 $300JOB 50" high, 16" deep reach IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 14 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Reach Range $3001 $300JOBIE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: 30 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 77 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Reach Range $3001 $300JOB 57" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 31 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Signage $2701 $270JOBSA10APCODE 4.1.3(16)ADAAG 91 At final exit door to exterior: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT" sign at door. • As-Built Description: • Proposed Solution: 2 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Vertical Clearance $3007 $2,100LF 28.5" high EG01APCODE 4.4.2ADAAG 91 Overhead clearance less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 11 307.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 78 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Vertical Clearance $3005 $1,500LF 56" high EG01APCODE 4.4.2ADAAG 91 Overhead clearance less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 12 307.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 79 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Men's Restroom2 Staff Only Accessible Route $7525 $1,875SF 3.1% EF07PCODE 4.3.7ADAAG 91 Cross slope more than 1":48" (2.083%). Modify cross slope. • As-Built Description: • Proposed Solution: • As-Built: 42 403.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Accessories $2251 $225JOB 12" o.c. and 18.5" high WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 43 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 80 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Accessories $4501 $450JOB 41.5" high WG03PCODE 4.19.6ADAAG 91 Bottom of mirror located above lavatories or countertops more than 40" above floor. Relocate or provide new accessible mirror. • As-Built Description: • Proposed Solution: • As-Built: 19 603.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Door $9001 $900JOB 45.5" o.c. ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 44 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Door Clearance $7,8001 $7,800JOB 29" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 17 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 81 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Door Swing $15,0001 $15,000JOB 52" from face of door ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 18 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Grab Bars $1,0201 $1,020JOB Extends 20" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 41 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Water Closet $1,5001 $1,500JOB 19" o.c. WB02CPCODE Fig. 28ADAAG 91 Water closet not 16"-18" (CA: 17"-18") from near side wall to center line of water closet (2010 ADAAG: 16"-18"). Relocate existing water closet and plumbing, remount with offset closet flange to provide 18" max. from side wall. • As-Built Description: • Proposed Solution: • As-Built: 40 604.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 82 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Women's Restroom3 Staff Only Accessible Route $7525 $1,875SF 2.7% EF07PCODE 4.3.7ADAAG 91 Cross slope more than 1":48" (2.083%). Modify cross slope. • As-Built Description: • Proposed Solution: • As-Built: 22 403.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Accessories $2251 $225JOB 12" o.c. and 18.5" high WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 23 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 83 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Door $9001 $900JOB 45" o.c. ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 45 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Door Clearance $7,8001 $7,800JOB 27" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 20 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Grab Bars $1,0201 $1,020JOB Extends 21" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 21 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 84 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Lobby Stairs4 Staff Only Handrail $36030 $10,800LF Guards: 32" high ED08APCODEGuards (42" high) not provided at side of ramp or landing where drop-off to adjacent grade or floor exceeds 30" height (California building code requirement only). Provide new guards, including handrail at ramp. • As-Built Description: • Proposed Solution: • As-Built: 26 Mitigated: YES NO SeverityPriority 1 3 Height $22540 $9,000LF 30" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 25 505.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 85 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Top & Bottom Extension at Stairs REFED06REFPCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 24 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 86 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor City Council Chamber5 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 38 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 37 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 87 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Disabled Seating $1,3501 $1,350JOBGB01APCODE 4.1.3(19)(a)ADAAG 91 Wheelchair space (33"x48") not provided at fixed seating with forward or rear approach. (NOTE: Space must be adjacent to regular seating; can provide easily removable fixed seat). Remove fixed seating and provide wheelchair space plus necessary maneuvering clearance. • As-Built Description: • Proposed Solution: 33 221.2ADA 2010 51 seats, 6 accessible, including 4 companion • Notes: Mitigated: YES NO SeverityPriority 2 3 Door Clearance $7,8001 $7,800JOB 19" clear opening width, leaf ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 35 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 2 1 Elevator ?1 $360,000JOB 44" deep 48" to door, 78" wide IK04APCODE Fig. 22ADAAG 91 In an elevator cab with 36” wide side slide opening doors, cab-size is not 68” min wide and/or 54” min deep between the back wall and the elevator door, and 51” min deep between the back wall and the return panel. Provide new elevator. • As-Built Description: • Proposed Solution: • As-Built: 29 407.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 88 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Elevator $3602 $720JOBIK11CPCODE 4.10.5ADAAG 91 Braille and raised floor numbers on entrance jambs located more or less than 5' above floor. Relocate Braille and raised floor numbers on entrance jambs to 5' above floor. • As-Built Description: • Proposed Solution: 27 703.4.1ADA 2010 No star • Notes: Mitigated: YES NO SeverityPriority 1 3 Elevator $1506 $900SETIK11NTPCODEBraille symbols on floor indicators of each elevator entrance jamb not compliant. Provide compliant floor numbering on elevator door jambs. • As-Built Description: • Proposed Solution: 28 407.2.3.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Handrails $2855 $1,425LFED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: 36 505.2ADA 2010 No handrails to staff area • Notes: Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 89 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Public Participation Counter $6,0001 $6,000JOB 43" high GB02APCODE 4.32.3ADAAG 91 Speaker podium is not accessible. Upper edge of podium is more than 34" above the finished floor, and knee space is less than 27" high, 30" wide, and 19" deep. Provide additional, integrated, and accessible speaker podium. • As-Built Description: • Proposed Solution: • As-Built: 34 902.3ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Signage $2701 $270JOBSA10DPCODE 4.1.3(16)ADAAG 91 At door leading into exit corridor: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT ROUTE" sign at door. • As-Built Description: • Proposed Solution: 32 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Stages $75,0001 $75,000JOBGC01APCODE 4.33.5ADAAG 91 Stage, enclosed and unenclosed platform, backstage areas or orchestra pit not accessible. Chair lift to raised platform. • As-Built Description: • Proposed Solution: 39 206.7.2ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 90 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor All Gender Restroom7 Staff Only Accessories $2251 $225JOB 4" o.c. WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 173 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Door Swing $15,0001 $15,000JOB Door width plus 12" to wall ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 174 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 91 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Grab Bars $1,0201 $1,020JOB Extends 20" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 172 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Signage $1501 $150JOB 64" high SA07PCODE 4.30.6ADAAG 91 Sign not located on latch side of door and/or not located at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters. Provide compliant signage including tactile characters and Grade II Braille on latch side of door located at compliant height. • As-Built Description: • Proposed Solution: • As-Built: 175 703.4.1ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 170 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 92 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Toilet Stall $6,0001 $6,000JOB 43" to side wall WB01APCODE60" min. clearance around a water closet measured perpendicular from the side wall not provided (Fixtures are not allowed to overlap this clearance). Remove adjacent fixture and provide new enclosure at accessible water closet. • As-Built Description: • Proposed Solution: • As-Built: 171 604.3.1; 604.3.2ADA 2010 19" between water closet and lavatory. • Notes: Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 93 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Detective8 Staff Only Door $7,5001 $7,500JOB 44" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 179 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 2 4 Door Swing $1501 $150JOB Door width plus 4" to desk ID24APCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 180 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 94 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Height $22550 $11,250LF 32" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 446 505.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 95 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Interview Room9 Staff Only General Note REF Storage currently GN01PCODERefer to notes for observation and recommendation. • As-Built Description: • Proposed Solution: • As-Built: 176 If used must provide accessible • Notes: Mitigated: YES NO Priority 2 0 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 96 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Kitchen10 Staff Only Door Swing $1501 $150JOB Door width plus 16.5" to cabinet. ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 177 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 97 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Locker Room11 Staff Only Turning Space $1,5001 $1,500JOBIH05PCODEThe area does not provide a minimum 60" diameter turning space within to allow maneuvering through the space. Modify area to provide sufficient maneuvering space. • As-Built Description: • Proposed Solution: 178 304.3ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 98 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Men's Restroom12 Staff Only Accessories $3001 $300JOB PTD: 48" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 186 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Door $9001 $900JOB 46" high ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 187 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 99 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Door Clearance $7,8001 $7,800JOB 26" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 182 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Door Swing $15,0001 $15,000JOB Door width plus 7" to wall ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 183 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Restroom ?1 $105,000JOB No accessible stall WA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: • As-Built: 185 603.1ADA 2010 Mitigated: YES NO SeverityPriority 3 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 100 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 181 Mitigated: YES NO SeverityPriority 3 3 Urinal $4,5001 $4,500JOB 24" wide clear floor space WE04PCODE 4.18.3ADAAG 91 30" x 48" clear floor space in front of accessible urinal not provided. Provide clear floor space in front of accessible urinal. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 184 605.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 101 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Conference Room13 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 188 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Reach Range $3001 $300JOB 58" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 189 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 102 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Sally Port14 Staff Only Ramps $30030 $9,000SF Step into jail Room EB01APCODE 4.1.1ADAAG 91 Ramp needed to provide disabled access at steps or change of level along path of travel. Provide new concrete ramp with handrails [slope more than 1:20 (5.0%) needed]. • As-Built Description: • Proposed Solution: • As-Built: 190 303.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 103 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor General Jail Area15 Staff Only Door Pair $4,5001 $4,500JOB 29" clear opening width ID08APCODE 4.13.4ADAAG 91 Pair of doors on accessible route has less than 32" clear opening width with one leaf open 90°. Provide new door leaves, unequal in width, to existing frame for pair of doors. • As-Built Description: • Proposed Solution: • As-Built: 191 404.2.2ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Fixed Bench $1,5001 $1,500JOB 16" high, 17" deep NO06APCODE 4.37.5ADAAG 91 Seat front edge height is not between 17" min. to 19" max. above ground of floor space. Provide new compliant bench with accessible dimensions. • As-Built Description: • Proposed Solution: • As-Built: 192 903.5ADA 2010 Mitigated: YES NO SeverityPriority 2 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 104 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Fixed Bench $1,5001 $1,500JOBNO07PCODE 4.32.2ADAAG 91 Clear and level floor or ground space (30" x 48") not overlapping with other clear space requirements, is not provided at at least one end of the bench. Provide and position a clear and level floor or ground space to allow wheelchair users to be seated shoulder-to-shoulder with an individual seated on the bench. • As-Built Description: • Proposed Solution: 19 903.2ADA 2010 Mitigated: YES NO SeverityPriority 2 2 General Note REFGN01PCODERefer to notes for observation and recommendation. • As-Built Description: • Proposed Solution: 195 Rest of jail was not being used. If jail becomes active, access elements must be provided during that time. • Notes:Mitigated: YES NO Priority 2 0 Public Counter $6,0001 $6,000JOB Counter 42" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 193 904.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 105 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Public Counter $6,0001 $6,000JOB 38" high to top of finger printing IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 194 904.4ADA 2010 Mitigated: YES NO SeverityPriority 2 4 Vertical Clearance $1,5001 $1,500JOB 75" high EG01PCODE 4.4.2ADAAG 91 Overhead clearance less than 80" above finished floor. Modify overhead clearance. • As-Built Description: • Proposed Solution: • As-Built: 18 307.4ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 106 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Women's Restroom16 Staff Only Accessories $3001 $300JOB PTD: 48" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 199 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Door Clearance $7,8001 $7,800JOB 27" clear width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 198 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 107 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Door Swing $1501 $150JOB 12" strike ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 202 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Door Swing $15,0001 $15,000JOB 39" deep ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 197 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Drinking Fountain $6,0001 $6,000JOB No high low IA01APCODE 4.1.3(10)(a)ADAAG 91 Where only one drinking fountain is provided per floor: Fountain is not accessible to individuals who use wheelchairs, or to those who have difficulty bending or stooping. Provide additional fountain or hi-lo combination fountain. • As-Built Description: • Proposed Solution: • As-Built: 203 211.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 108 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Lavatory $3601 $360JOBWD05PCODE 4.19.4ADAAG 91 Hot or sharp-surfaced water/drain pipe not insulated or covered. Insulate or cover water/drain pipe. • As-Built Description: • Proposed Solution: 200 606.5ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Restroom ?1 $105,000JOBWA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: 201 603.1ADA 2010 Mitigated: YES NO SeverityPriority 3 1 Signage $2701 $270JOBSA11APCODE 4.1.3(16)(a)ADAAG 91 Entrance to toilet or bathing facility not identified with ADAAG compliant signage. Provide ADA compliant sign mounted at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters on nearest adjacent wall, on latch side of a single door (located not to cause a Braille reader to stand within the door swing). • As-Built Description: • Proposed Solution: 196 216.8; 703.6.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 109 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 20 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 110 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-1 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:First Floor Typical Office17 Staff Only Door Swing $1501 $150JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 240 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 First Floor $887,835.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 111 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Lobby1 Staff Only Brochure Bins $3001 $300JOB 55" high IN08PCODE 4.2.5 & 6ADAAG 91 Information brochure bins mounted above accessible height of 48". Relocate/remount bins at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 122 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Desk $7,5001 $7,500JOB 42" high IN02PCODE 4.32.3 & .4ADAAG 91 Accessible fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide new fixed accessible table or desk. • As-Built Description: • Proposed Solution: • As-Built: 123 306.1 & 902.3ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 112 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Door $7,5001 $7,500JOB 48" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 127 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Door $9001 $900JOB 48" high ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 46 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Closer $1,1251 $1,125JOB 12 lbs. 2 seconds ID03APCODE 4.13.10 &11ADAAG 91 Excessive force required to open door and/or door closing time of less than 5 seconds. Provide new door closer adjusted to accessible standards. • As-Built Description: • Proposed Solution: • As-Built: 48 404.2.8 & 404.2.9ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 113 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Door Hardware $7501 $750JOB 1" deep ID07PCODE 4.13.9ADAAG 91 Door does not have accessible operating hardware. Provide lever handle or other accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 72 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Swing $15,0001 $15,000JOBID24CPCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Provide door operator. • As-Built Description: • Proposed Solution: 47 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Doormat $1,5001 $1,500JOBID05PCODE 4.5.3ADAAG 91 Doormat hinders access to disabled persons. Provide new doormat; recess or attach at edges. • As-Built Description: • Proposed Solution: 49 302.2ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 114 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Fire Alarm $8251 $825JOB 49" high IC03PCODE 4.2.5ADAAG 91 Fire alarm pull stations not 42"-48" from floor to center. Note: Required only at new construction, or where mounting location was or is to be remodeled. Remount fire alarm station to be 42" min., and 48" max. from floor to center. • As-Built Description: • Proposed Solution: • As-Built: 53 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Protrusion Limits $3002 $600LF Protrudes 7.5" at 45" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 52 307.2ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Reach Range $3001 $300JOB 52" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 51 308.2.1ADA 2010 Remove chairs • Notes: Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 115 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Signage $1501 $150JOB 62" to tactile SA07PCODE 4.30.6ADAAG 91 Sign not located on latch side of door and/or not located at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters. Provide compliant signage including tactile characters and Grade II Braille on latch side of door located at compliant height. • As-Built Description: • Proposed Solution: • As-Built: 126 703.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Signage $2701 $270JOBSA10APCODE 4.1.3(16)ADAAG 91 At final exit door to exterior: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT" sign at door. • As-Built Description: • Proposed Solution: 50 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Vending Machine 2 REF 55" high IL02PCODE 4.2.5ADAAG 91 Vending machine coin slot or dispensing outlet, more than 48" above the floor. Advise vendor/leasing company to provide accessible vending machine with highest operable part at 48" max. • As-Built Description: • Proposed Solution: • As-Built: 121 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 116 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Conference Room 22 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 125 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 124 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 117 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Height $22520 $4,500LF 33.5" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 55 505.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Stairway $4216 $672LFII02BPCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide 2" min., 4" max. wide contrasting color strip 1" max. from nosing on top & bottom treads when altering area. • As-Built Description: • Proposed Solution: 54 504.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 118 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Conference Room 13 Staff Only Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 57 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Door $3001 $300JOBID06PCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Provide 10" min. "kick plate" covering width of door when altering area. • As-Built Description: • Proposed Solution: 131 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 119 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Door $7,5003 $22,500JOB 48" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 129 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Drinking Fountain $9,0001 $9,000JOB 6" deep IA04PCODECA only: Drinking fountain not located in an alcove (min. 32" wide x 18" deep) or otherwise encroaches into pedestrian way. Provide new alcove for drinking fountain, or, if unreasonable hardship is determined, provide wing walls or cane-detectable railings on each side of the drinking fountain. The wings must project out from the supporting wall at least as far as the drinking fountain to within 6” of the surface of the circulation path, but cannot reduce the required • As-Built Description: • Proposed Solution: • As-Built: 144 Mitigated: YES NO SeverityPriority 3 2 Drinking Fountain $1,5001 $1,500JOBIA05CPCODE 4.4.1ADAAG 91 Drinking fountain lacks protection for visually impaired persons. Provide cane-detectable rails. • As-Built Description: • Proposed Solution: 130 307.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 120 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Signage $1501 $150JOB Located on door SA07PCODE 4.30.6ADAAG 91 Sign not located on latch side of door and/or not located at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters. Provide compliant signage including tactile characters and Grade II Braille on latch side of door located at compliant height. • As-Built Description: • Proposed Solution: • As-Built: 56 703.4.1ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Signage $1501 $150JOB 60.5"-62" to bottom of tactile SA07PCODE 4.30.6ADAAG 91 Sign not located on latch side of door and/or not located at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters. Provide compliant signage including tactile characters and Grade II Braille on latch side of door located at compliant height. • As-Built Description: • Proposed Solution: • As-Built: 128 703.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 121 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East All Gender Restrooms4 Staff Only Accessories $2251 $225JOB 18" high and 12" o.c. WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 135 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Cooktops $1,9501 $1,950JOBKF15PCODE 13.3.4(6)ADAAG 91 Cooktop controls require reaching across the burners. Provide cooktop with accessible controls. • As-Built Description: • Proposed Solution: 61 804.6.2ADA 2010 Range not front controls • Notes:Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 122 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Door $7,5001 $7,500JOB 49" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 58 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Swing $15,0001 $15,000JOB 57" from face of door ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 137 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Grab Bars $1,0201 $1,020JOB Extends 21" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 133 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 123 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Grab Bars $2251 $225JOBWB07IPCODE 4.26.2ADAAG 91 Accessories/dispensers in accessible stall located closer than 1-1/2" below or 12" above grab bar impedes its use. Relocate accessories/dispensers to be no closer than 1-1/2" below and 12" above grab bars (except if accessories are recessed, flush with wall, and have no sharp edges). • As-Built Description: • Proposed Solution: 134 609.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Protrusion Limits $3003 $900LF TV protrudes 6" at 60" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 65 307.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Public Counter $6,0001 $6,000JOB 36" high IN03APCODE 4.32.3 & 4ADAAG 91 Sales and service counter: Accessible section not provided (knee space min. 27" high x 19" deep x 30" wide) Retrofit existing counter to provide accessible seating section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 60 306.3; 904.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 124 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Reach Range $3001 $300JOB 68" high IE02PCODE 4.2.6ADAAG 91 Reach height to control or access point, where side approach is available, exceeds 48" or is less than 15" in height, or exceeds 10" in depth. Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 62 308.3.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Signage $2701 $270JOB Exit sign should say exit route SA10DPCODE 4.1.3(16)ADAAG 91 At door leading into exit corridor: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT ROUTE" sign at door. • As-Built Description: • Proposed Solution: • As-Built: 59 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Sink $5,2501 $5,250JOB Top: 36" high IN06PCODE 4.24.2ADAAG 91 Sink rim higher than 34" above floor. Remodel sink cabinet to lower sink. • As-Built Description: • Proposed Solution: • As-Built: 64 606.3ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 125 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Sink $5,2501 $5,250JOB Knee space: none IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 63 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Toilet Stall $6,0001 $6,000JOB 24" between water closet and lavatory, 45" side wall WB01PCODELess than 32" from side of water closet to far side of stall wall or 28" to adjacent fixture. Relocate water closet. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 132 Mitigated: YES NO SeverityPriority 3 3 Water Closet $15,0001 $15,000JOB 46" in front of water closet WB03APCODECA only: In single-accommodation restroom less than 48" in front of water closet provided. Remodel restroom to provide at least 48" in front of water closet. • As-Built Description: • Proposed Solution: • As-Built: 136 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 126 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East All Gender Restrooms5 Staff Only Accessories $2251 $225JOB 16" o.c. WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 142 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Door Swing $15,0001 $15,000JOB 57" from face of door ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 138 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 127 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Grab Bars $1,0201 $1,020JOB Extends 21" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 140 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Grab Bars $2251 $225JOBWB07IPCODE 4.26.2ADAAG 91 Accessories/dispensers in accessible stall located closer than 1-1/2" below or 12" above grab bar impedes its use. Relocate accessories/dispensers to be no closer than 1-1/2" below and 12" above grab bars (except if accessories are recessed, flush with wall, and have no sharp edges). • As-Built Description: • Proposed Solution: 141 609.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Public Counter $6,0001 $6,000JOB 36" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 66 904.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 128 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Toilet Stall $6,0001 $6,000JOB 52" wide WB01PCODELess than 32" from side of water closet to far side of stall wall or 28" to adjacent fixture. Relocate water closet. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 139 25" between water closet and lavatory. • Notes: Mitigated: YES NO SeverityPriority 3 3 Water Closet $15,0001 $15,000JOB 45" in front of water closet WB03APCODECA only: In single-accommodation restroom less than 48" in front of water closet provided. Remodel restroom to provide at least 48" in front of water closet. • As-Built Description: • Proposed Solution: • As-Built: 143 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 129 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor All Gender Restroom6 Staff Only Accessories $3001 $300JOB SD: 42" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 70 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Accessories $2251 $225JOB TPD: 17" high WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 71 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 130 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Door $7,5001 $7,500JOB 48" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 145 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Door Swing $1501 $150JOB 46" from face of door to cabinet. ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 68 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Lavatory $2,7001 $2,700JOB Top: 35" high WD02APCODE 4.19.2ADAAG 91 Lavatory: Fixture rim or counter height more than 34" above floor. Remount compliant fixture at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 9 606.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 131 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Lavatory $10,2001 $10,200JOB Knee space: 27" high WD04PCODE Fig. 31ADAAG 91 Knee clearance 27" min. high starting 8" back from the front edge of the lavatory towards the wall is not provided. Provide new accessible lavatory. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 69 306.3.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Public Counter $6,0001 $6,000JOB 36" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 146 904.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Signage $2701 $270JOB Does not contrast with door SA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: • As-Built: 67 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 132 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Women's Restroom7 Staff Only Accessories $2251 $225JOB Behind water closet WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 156 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 1 Door Swing $1501 $150JOB 52" from face of door ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 149 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 133 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Grab Bars $1,0201 $1,020JOB Extends 22" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 154 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Grab Bars $2251 $225JOBWB07IPCODE 4.26.2ADAAG 91 Accessories/dispensers in accessible stall located closer than 1-1/2" below or 12" above grab bar impedes its use. Relocate accessories/dispensers to be no closer than 1-1/2" below and 12" above grab bars (except if accessories are recessed, flush with wall, and have no sharp edges). • As-Built Description: • Proposed Solution: 155 609.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Protrusion Limits $3001 $300JOB Shelf protrudes 8" at 34" high EG04PCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Remove/relocate protruding object. Patch existing surface. • As-Built Description: • Proposed Solution: • As-Built: 147 307.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 134 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Ramp $13510 $1,350SF 52" long EB07APCODETop landing less than 60" long. (CA only: 60" x 60"). Modify ramp top landing to 60" in length and 60" wide. • As-Built Description: • Proposed Solution: • As-Built: 74 405.7.3ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Slope $30030 $9,000SF 9.5% EB02PCODE 4.8.2ADAAG 91 Slope greater than 1:12 (8.3%). Demolish existing and provide new ramp with handrails. • As-Built Description: • Proposed Solution: • As-Built: 73 405.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Stairway $4212 $504LFII02BPCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide 2" min., 4" max. wide contrasting color strip 1" max. from nosing on top & bottom treads when altering area. • As-Built Description: • Proposed Solution: 75 504.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 135 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Toilet Stall $4,5001 $4,500JOB 58" wide, 31" side WB06PCODE 4.17.3ADAAG 91 Toilet stall less than 60" wide. Provide new accessible stall. • As-Built Description: • Proposed Solution: • As-Built: 153 604.8.1.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Turning Space $1,5001 $1,500JOBIH05PCODEThe area does not provide a minimum 60" diameter turning space within to allow maneuvering through the space. Modify area to provide sufficient maneuvering space. • As-Built Description: • Proposed Solution: 148 304.3ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Water Closet $1,5001 $1,500JOB 18.5" o.c. WB02CPCODE Fig. 28ADAAG 91 Water closet not 16"-18" (CA: 17"-18") from near side wall to center line of water closet (2010 ADAAG: 16"-18"). Relocate existing water closet and plumbing, remount with offset closet flange to provide 18" max. from side wall. • As-Built Description: • Proposed Solution: • As-Built: 150 604.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 136 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Water Closet $15,0001 $15,000JOB 47" in front of water closet WB03APCODECA only: In single-accommodation restroom less than 48" in front of water closet provided. Remodel restroom to provide at least 48" in front of water closet. • As-Built Description: • Proposed Solution: • As-Built: 151 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 137 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Men's Restroom8 Staff Only Accessories $2251 $225JOB Behind water closet WG02PCODE 4.16.6ADAAG 91 Toilet paper dispenser less than 15" (CA: 19") or more than 48" above floor or not within 7" to 9" from front of water closet (Note: CA pre-2010 is allowed within 12" from front of water closet). Relocate or provide new toilet paper dispenser. • As-Built Description: • Proposed Solution: • As-Built: 162 604.7ADA 2010 Mitigated: YES NO SeverityPriority 3 1 Door $7,5002 $15,000JOB 53" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 91 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 138 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Door $9001 $900JOB 48" high o.c. ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 76 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Swing $1501 $150JOB 52" from face of door ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 157 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Doormat $1,5001 $1,500JOBID05PCODE 4.5.3ADAAG 91 Doormat hinders access to disabled persons. Provide new doormat; recess or attach at edges. • As-Built Description: • Proposed Solution: 77 302.2ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 139 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Drinking Fountain $6,0001 $6,000JOBIA01APCODE 4.1.3(10)(a)ADAAG 91 Where only one drinking fountain is provided per floor: Fountain is not accessible to individuals who use wheelchairs, or to those who have difficulty bending or stooping. Provide additional fountain or hi-lo combination fountain. • As-Built Description: • Proposed Solution: 78 211.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Grab Bars $1,0201 $1,020JOB Extends 21" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 160 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Grab Bars $2251 $225JOBWB07IPCODE 4.26.2ADAAG 91 Accessories/dispensers in accessible stall located closer than 1-1/2" below or 12" above grab bar impedes its use. Relocate accessories/dispensers to be no closer than 1-1/2" below and 12" above grab bars (except if accessories are recessed, flush with wall, and have no sharp edges). • As-Built Description: • Proposed Solution: 161 609.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 140 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Signage $1506 $900JOBSA07PCODE 4.30.6ADAAG 91 Sign not located on latch side of door and/or not located at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters. Provide compliant signage including tactile characters and Grade II Braille on latch side of door located at compliant height. • As-Built Description: • Proposed Solution: 92 703.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Toilet Stall $4,5001 $4,500JOB 58" wide WB06PCODE 4.17.3ADAAG 91 Toilet stall less than 60" wide. Provide new accessible stall. • As-Built Description: • Proposed Solution: • As-Built: 158 604.8.1.1ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Water Closet $15,0001 $15,000JOB 47" in front of water closet WB03APCODECA only: In single-accommodation restroom less than 48" in front of water closet provided. Remodel restroom to provide at least 48" in front of water closet. • As-Built Description: • Proposed Solution: • As-Built: 159 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 141 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Men's Restroom9 Staff Only Accessories $4501 $450JOB 42" high WG03PCODE 4.19.6ADAAG 91 Bottom of mirror located above lavatories or countertops more than 40" above floor. Relocate or provide new accessible mirror. • As-Built Description: • Proposed Solution: • As-Built: 81 603.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Cooktops $1,9501 $1,950JOB Controls over burner KF15PCODE 13.3.4(6)ADAAG 91 Cooktop controls require reaching across the burners. Provide cooktop with accessible controls. • As-Built Description: • Proposed Solution: • As-Built: 164 804.6.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 142 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Door Swing $1,5001 $1,500JOB Door width plus 4" to partition. ID23PCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Change door swing. • As-Built Description: • Proposed Solution: • As-Built: 83 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Electrical $9001 $900JOB 50" high IC01PCODE 4.2.5 & 6ADAAG 91 Electric switch or control mounted less than 15" measured to the bottom of the outlet box or greater than 48 inches measured to the top of the outlet box. Relocate light switches or control to between 15" and 48" height. • As-Built Description: • Proposed Solution: • As-Built: 167 308.2.1 & 308.2.2ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Grab Bars $1,0201 $1,020JOB Extends 20" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 86 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 143 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Non-Fixed Desk $4,8001 $4,800JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 163 306.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Protrusion Limits $3004 $1,200LF Shelf protrudes 12" at 42" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 80 307.2ADA 2010 Mitigated: YES NO SeverityPriority 3 1 Reach Range $3001 $300JOB 50" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 166 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 144 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Sink $5,2501 $5,250JOB Knee space: none IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 165 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Urinal $4,5001 $4,500JOB 29" wide WE04PCODE 4.18.3ADAAG 91 30" x 48" clear floor space in front of accessible urinal not provided. Provide clear floor space in front of accessible urinal. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 82 605.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Water Closet $1,5001 $1,500JOB 19.5" o.c. WB02CPCODE Fig. 28ADAAG 91 Water closet not 16"-18" (CA: 17"-18") from near side wall to center line of water closet (2010 ADAAG: 16"-18"). Relocate existing water closet and plumbing, remount with offset closet flange to provide 18" max. from side wall. • As-Built Description: • Proposed Solution: • As-Built: 85 604.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 145 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Wheelchair Clearance $5102 $1,020LF 42.5" wide WC02APCODE 4.3.3ADAAG 91 Clear passage width (except doorways) from rest room entry to accessible water closet compartment less than 36" (CA only: 44" wide). Modify facility passage to be min. 44" wide. Demolish existing partition and replace. • As-Built Description: • Proposed Solution: • As-Built: 79 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 146 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Women's Restroom10 Staff Only Accessories $4501 $450JOB 40.5" high WG03PCODE 4.19.6ADAAG 91 Bottom of mirror located above lavatories or countertops more than 40" above floor. Relocate or provide new accessible mirror. • As-Built Description: • Proposed Solution: • As-Built: 106 603.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Door Swing $1,5001 $1,500JOB Door width plus 8" to partition ID23PCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Change door swing. • As-Built Description: • Proposed Solution: • As-Built: 107 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 147 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Door Swing $1501 $150JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 104 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Grab Bars $1,0201 $1,020JOB Extends 21" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 108 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Height $22570 $15,750LF 33" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 168 505.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 148 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Reach Range $3001 $300JOB 62" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 105 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Signage $2701 $270JOBSA10APCODE 4.1.3(16)ADAAG 91 At final exit door to exterior: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT" sign at door. • As-Built Description: • Proposed Solution: 169 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 149 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Employee Break Room11 Staff Only Cooktops $1,9501 $1,950JOBKF15PCODE 13.3.4(6)ADAAG 91 Cooktop controls require reaching across the burners. Provide cooktop with accessible controls. • As-Built Description: • Proposed Solution: 87 804.6.2ADA 2010 Stove requires reach over burner • Notes:Mitigated: YES NO SeverityPriority 4 2 Door Swing $1501 $150JOB Door width plus 12" to boxes ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 241 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 150 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Door Swing $1501 $150JOB Door width plus 13" to boxes ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 243 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Non-Fixed Desk $4,8001 $4,800JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 90 306.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Reach Range $3001 $300JOB 44" high and 23" reach depth IE02PCODE 4.2.6ADAAG 91 Reach height to control or access point, where side approach is available, exceeds 48" or is less than 15" in height, or exceeds 10" in depth. Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 89 308.3.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 151 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Sink $5,2501 $5,250JOB Remove cabinets IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 88 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 152 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Typical Office12 Staff Only Door Swing $1505 $750JOB 48" from face of door ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 244 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Reach Range $3001 $300JOB 50" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 93 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 2 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 153 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Signage $1501 $150JOBSA07PCODE 4.30.6ADAAG 91 Sign not located on latch side of door and/or not located at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters. Provide compliant signage including tactile characters and Grade II Braille on latch side of door located at compliant height. • As-Built Description: • Proposed Solution: 246 703.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 154 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Conference Room13 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 95 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 94 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 155 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Door Swing $1503 $450JOB 44" from face of door ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 248 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Non-Fixed Desk $4,8001 $4,800JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 97 306.1ADA 2010 Mitigated: YES NO SeverityPriority 2 2 Protrusion Limits $3004 $1,200LF Protrudes 4.5" at 33" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 96 307.2ADA 2010 Mitigated: YES NO SeverityPriority 2 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 156 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Public Counter $6,0001 $6,000JOB 42" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 247 904.4ADA 2010 Staff Only • Notes: Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 157 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Employee Area14 Staff Only Corridor $1501 $150JOB 35" wide IH03APCODE 4.3.3ADAAG 91 Corridor, for occupant load less than 10, less than 36" wide. Remove or relocate furniture and storage items. • As-Built Description: • Proposed Solution: • As-Built: 100 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Door Swing $1501 $150JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 99 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 158 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Door Swing $1503 $450JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 252 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Non-Fixed Desk $4,8001 $4,800JOB Knee space: 13" deep IN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: • As-Built: 98 306.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Non-Fixed Desk $4,8001 $4,800JOB Knee space: 15" wide IN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: • As-Built: 101 306.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 159 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Protrusion Limits $3006 $1,800LF Protrudes 4.5" at 30" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 102 307.2ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Protrusion Limits $3004 $1,200LF Protrudes 6" at 42" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 251 307.2ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Public Counter $6,0001 $6,000JOB 43" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 250 904.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 160 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Signage $2701 $270JOBSA10DPCODE 4.1.3(16)ADAAG 91 At door leading into exit corridor: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT ROUTE" sign at door. • As-Built Description: • Proposed Solution: 249 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 161 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor East Conference Room15 Staff Only Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 255 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Protrusion Limits $3004 $1,200LF Protrudes 6" at 42" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 103 307.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 162 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Public Health and Safety Office16 Staff Only Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 109 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Door Swing $1,5001 $1,500JOB 12" pull depth ID23PCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Change door swing. • As-Built Description: • Proposed Solution: • As-Built: 110 404.2.4ADA 2010 Make swing both ways • Notes: Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 163 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Door Swing $15,0001 $15,000JOB Counter in pull strike landing ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 119 404.2.4ADA 2010 Staff door • Notes: Mitigated: YES NO SeverityPriority 2 4 General Note REFGN01PCODERefer to notes for observation and recommendation. • As-Built Description: • Proposed Solution: 120 Relocate chairs outside of lowered counter clear space. • Notes:Mitigated: YES NO Priority 2 0 Non-Fixed Desk $4,8001 $4,800JOB Knee space: 13" deep IN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: • As-Built: 112 306.1ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 164 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Protrusion Limits $3001 $300LF Protrudes 7" at 37" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 111 307.2ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 165 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Break Room17 Staff Only Reach Range $3001 $300JOB 48" high over obstruction IE02PCODE 4.2.6ADAAG 91 Reach height to control or access point, where side approach is available, exceeds 48" or is less than 15" in height, or exceeds 10" in depth. Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 114 308.3.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Sink $5,2501 $5,250JOB Knee space: 26.5" high at bowl IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 113 606.2ADA 2010 Remove cabinets • Notes: Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 166 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Conference Room18 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 116 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 117 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 167 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Non-Fixed Desk $4,8001 $4,800JOB Knee space: 13" wide IN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: • As-Built: 115 306.1ADA 2010 Mitigated: YES NO SeverityPriority 2 2 Protrusion Limits $3005 $1,500LF Protrudes 4.5" at 35" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 118 307.2ADA 2010 Mitigated: YES NO SeverityPriority 2 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 168 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Fire Department19 Staff Only Assistive Listening REF ASL GI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: • As-Built: 296 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Door Swing $1501 $150JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 297 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 169 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-2 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Second Floor Fire Department Employee Space20 Staff Only Non-Fixed Desk $4,8001 $4,800JOB Knee space: 13" wide IN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: • As-Built: 298 306.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Second Floor $423,441.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 170 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Public Utilities1 Staff Only Protrusion Limits $3004 $1,200LF Protrudes 6" at 42" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 257 307.2ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Public Counter $6,0001 $6,000JOB 43" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 256 904.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 171 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Sink $5,2501 $5,250JOB Top: 39" high IN06PCODE 4.24.2ADAAG 91 Sink rim higher than 34" above floor. Remodel sink cabinet to lower sink. • As-Built Description: • Proposed Solution: • As-Built: 258 606.3ADA 2010 Mitigated: YES NO SeverityPriority 2 4 Sink $1501 $150JOB 9" o.c. IN06EPCODE 4.24.5ADAAG 91 No min. 30" x 48" clear floor or ground space for forward or parallel approach. Relocate object to provide path to sink • As-Built Description: • Proposed Solution: • As-Built: 259 606.2ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 172 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Admin Office2 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 261 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Door Swing $1501 $150JOB Door width plus 9" to cabinet ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 262 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 173 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Non-Fixed Desk $4,8001 $4,800JOB Knee space: 13" wide IN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: • As-Built: 260 306.1ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 174 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Assistant Manager Office3 Staff Only Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 264 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Non-Fixed Desk $4,8001 $4,800JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 263 306.1ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 175 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Utilities Compliance4 Staff Only Door Swing $1,5001 $1,500JOB Door width plus 7" to wall ID23PCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Change door swing. • As-Built Description: • Proposed Solution: • As-Built: 265 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 176 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Conference Room 45 Staff Only Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 266 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 177 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Women's Restroom6 Staff Only Door Swing REF 51" from face of door ID23CREFPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 269 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Door Swing $15,0001 $15,000JOB Door width plus 24" to drinking fountain ID24CPCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Provide door operator. • As-Built Description: • Proposed Solution: • As-Built: 267 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 178 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Door Threshold $7501 $750JOB 0.5" high ID02PCODE 4.1.6(3)(d)(ii)ADAAG 91 Existing threshold at door is 1/2" high or less but without a beveled edge on both sides. Modify threshold to have beveled edge on each side. • As-Built Description: • Proposed Solution: • As-Built: 283 404.2.5ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Lavatory $2,7001 $2,700JOB Top: 34.5" high WD02APCODE 4.19.2ADAAG 91 Lavatory: Fixture rim or counter height more than 34" above floor. Remount compliant fixture at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 270 606.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Signage $2701 $270JOBSA11APCODE 4.1.3(16)(a)ADAAG 91 Entrance to toilet or bathing facility not identified with ADAAG compliant signage. Provide ADA compliant sign mounted at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters on nearest adjacent wall, on latch side of a single door (located not to cause a Braille reader to stand within the door swing). • As-Built Description: • Proposed Solution: 268 216.8; 703.6.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 179 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Stall Door $751 $75JOBWB05BPCODE 4.22.4ADAAG 91 Stall door to accessible compartment not self closing. Adjust closer. • As-Built Description: • Proposed Solution: 272 604.8.1.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Stall Door $3001 $300JOBWB05CPCODE 4.17.5ADAAG 91 Stall door does not have accessible operating hardware (U-pulls on both sides, flip-over or sliding lock). Provide new accessible locking hardware that does not require grasping, pinching, or twisting and U- pulls on both sides. • As-Built Description: • Proposed Solution: 273 604.8.1.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Water Closet $1,5001 $1,500JOB 19" o.c. WB02CPCODE Fig. 28ADAAG 91 Water closet not 16"-18" (CA: 17"-18") from near side wall to center line of water closet (2010 ADAAG: 16"-18"). Relocate existing water closet and plumbing, remount with offset closet flange to provide 18" max. from side wall. • As-Built Description: • Proposed Solution: • As-Built: 271 604.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 180 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Men's Restroom7 Staff Only Coat Hook $1501 $150JOB 70" high WG03APCODE 4.2.5ADAAG 91 Accessible coat hook not within reach range. Adjust existing or provide new coat hook at maximum 48" height. • As-Built Description: • Proposed Solution: • As-Built: 282 603.4ADA 2010 Mitigated: YES NO SeverityPriority 3 1 Door Threshold $7501 $750JOB 0.5" vertical ID02PCODE 4.1.6(3)(d)(ii)ADAAG 91 Existing threshold at door is 1/2" high or less but without a beveled edge on both sides. Modify threshold to have beveled edge on each side. • As-Built Description: • Proposed Solution: • As-Built: 275 404.2.5ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 181 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Lavatory $2,7001 $2,700JOB Top: 34.5" high WD02APCODE 4.19.2ADAAG 91 Lavatory: Fixture rim or counter height more than 34" above floor. Remount compliant fixture at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 276 606.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Lavatory $3601 $360JOBWD05PCODE 4.19.4ADAAG 91 Hot or sharp-surfaced water/drain pipe not insulated or covered. Insulate or cover water/drain pipe. • As-Built Description: • Proposed Solution: 277 606.5ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Protrusion Limits $3004 $1,200LF Shelf protrudes 12" at 48" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 278 307.2ADA 2010 Mitigated: YES NO SeverityPriority 3 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 182 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Signage $2701 $270JOBSA11APCODE 4.1.3(16)(a)ADAAG 91 Entrance to toilet or bathing facility not identified with ADAAG compliant signage. Provide ADA compliant sign mounted at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters on nearest adjacent wall, on latch side of a single door (located not to cause a Braille reader to stand within the door swing). • As-Built Description: • Proposed Solution: 274 216.8; 703.6.1ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Stall Door $751 $75JOBWB05BPCODE 4.22.4ADAAG 91 Stall door to accessible compartment not self closing. Adjust closer. • As-Built Description: • Proposed Solution: 279 604.8.1.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Stall Door $3001 $300JOBWB05CPCODE 4.17.5ADAAG 91 Stall door does not have accessible operating hardware (U-pulls on both sides, flip-over or sliding lock). Provide new accessible locking hardware that does not require grasping, pinching, or twisting and U- pulls on both sides. • As-Built Description: • Proposed Solution: 280 604.8.1.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 183 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Water Closet $1,5001 $1,500JOB 19.5" o.c. WB02CPCODE Fig. 28ADAAG 91 Water closet not 16"-18" (CA: 17"-18") from near side wall to center line of water closet (2010 ADAAG: 16"-18"). Relocate existing water closet and plumbing, remount with offset closet flange to provide 18" max. from side wall. • As-Built Description: • Proposed Solution: • As-Built: 281 604.2ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 184 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Break Room8 Staff Only Reach Range $3001 $300JOB 60" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 286 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Reach Range $3001 $300JOB 50" high over obstruction IE02PCODE 4.2.6ADAAG 91 Reach height to control or access point, where side approach is available, exceeds 48" or is less than 15" in height, or exceeds 10" in depth. Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 285 308.3.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 185 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Sink $5,2501 $5,250JOB Knee space: 24" high IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 284 606.2ADA 2010 Remove cabinets • Notes: Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 186 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Hallway9 Staff Only Door $7,5001 $7,500JOB 59" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 290 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 1 1 Fire Alarm $8251 $825JOB 53" high IC03PCODE 4.2.5ADAAG 91 Fire alarm pull stations not 42"-48" from floor to center. Note: Required only at new construction, or where mounting location was or is to be remodeled. Remount fire alarm station to be 42" min., and 48" max. from floor to center. • As-Built Description: • Proposed Solution: • As-Built: 288 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 187 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Signage $2701 $270JOBSA10BPCODE 4.1.3(16)ADAAG 91 At door leading into exit stairway: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT STAIR UP/DOWN" sign at door. • As-Built Description: • Proposed Solution: 287 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 188 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Engineering10 Staff Only Assistive Listening REF ASL GI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: • As-Built: 292 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Door Swing $1504 $600JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 291 404.2.4ADA 2010 Door landing obstructed • Notes: Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 189 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Resource Management11 Staff Only Door Swing $1501 $150JOB 54" from face of door ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 293 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 4 Door Swing $1501 $150JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 294 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 190 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Non-Fixed Desk $4,8001 $4,800JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 295 306.1ADA 2010 Mitigated: YES NO SeverityPriority 2 2 Third Floor $72,495.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 191 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor Interior $1,740,576.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 192 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 1-1-3 City Hall Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Third Floor City Hall $1,808,676.00Facility:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 193 City Yard - Maintenance Building 1 4305 S Santa Fe Access Compliance Survey Report City of Vernon October 2020 SSA Project #:19033.00 6Facility #: 194 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 6-0-1 Exterior- On-Site City Yard - Maintenance Building 1 4305 S SANTA FE AVE VERNON, CA 90058 CITY YARD - MAINENANCE BUILDING 1 6-0-1 1 2 195 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 6-1-1 Interior- First Floor City Yard - Maintenance Building 1 4305 S SANTA FE AVE VERNON, CA 90058 CITY YARD - MAINTENANCE BUILDING 1 6-1-1 NO FLOOR PLANS PROVIDED 196 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-0-1 City Yard - Maintenance Building 1 Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:On-site General Warehouse Exterior1 Staff Only Accessible Route $7540 $3,000SF 4.5% cross slope EF07PCODE 4.3.7ADAAG 91 Cross slope more than 1":48" (2.083%). Modify cross slope. • As-Built Description: • Proposed Solution: • As-Built: 368 403.3ADA 2010 Path of travel between buildings • Notes:Mitigated: YES NO SeverityPriority 1 3 Minimum Number $9001 $900JOB No accessible parking. EA01APCODE 4.1.2(5)ADAAG 91 At parking lot with 1-25 spaces, the number of accessible spaces is less than required by code; 1 space required Provide required accessible parking space with sign including a minimum of one van space. • As-Built Description: • Proposed Solution: • As-Built: 367 208.2ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 197 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-0-1 City Yard - Maintenance Building 1 Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:On-site Main Warehouse2 Staff Only Reach Range $3001 $300JOB 16" reach depth IE02PCODE 4.2.6ADAAG 91 Reach height to control or access point, where side approach is available, exceeds 48" or is less than 15" in height, or exceeds 10" in depth. Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 366 308.3.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 On-site $4,200.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 198 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-0-1 City Yard - Maintenance Building 1 Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:On-site Exterior $4,200.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 199 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Office Building Entrance1 Staff Only Door $12020 $2,400SF 3.3% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 369 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Doormat $1,5001 $1,500JOBID05PCODE 4.5.3ADAAG 91 Doormat hinders access to disabled persons. Provide new doormat; recess or attach at edges. • As-Built Description: • Proposed Solution: 370 302.2ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 200 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Lobby2 Staff Only Electrical $9001 $900JOB 50" to top IC01PCODE 4.2.5 & 6ADAAG 91 Electric switch or control mounted less than 15" measured to the bottom of the outlet box or greater than 48 inches measured to the top of the outlet box. Relocate light switches or control to between 15" and 48" height. • As-Built Description: • Proposed Solution: • As-Built: 373 308.2.1 & 308.2.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Signage $2701 $270JOBSA10APCODE 4.1.3(16)ADAAG 91 At final exit door to exterior: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT" sign at door. • As-Built Description: • Proposed Solution: 371 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 201 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Vending Machine 2 REF 49"-52" high IL02PCODE 4.2.5ADAAG 91 Vending machine coin slot or dispensing outlet, more than 48" above the floor. Advise vendor/leasing company to provide accessible vending machine with highest operable part at 48" max. • As-Built Description: • Proposed Solution: • As-Built: 372 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 202 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Men's Restroom3 Staff Only Accessories $3001 $300JOB PTD: 55" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 376 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Door Swing $15,0001 $15,000JOB 57" from face of door ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 374 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 203 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Grab Bars $1,0201 $1,020JOB Extends 21" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 378 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Grab Bars $2251 $225JOBWB07IPCODE 4.26.2ADAAG 91 Accessories/dispensers in accessible stall located closer than 1-1/2" below or 12" above grab bar impedes its use. Relocate accessories/dispensers to be no closer than 1-1/2" below and 12" above grab bars (except if accessories are recessed, flush with wall, and have no sharp edges). • As-Built Description: • Proposed Solution: 379 609.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Lavatory $10,2001 $10,200JOB Apron: 28" high WD03PCODE 4.19.2ADAAG 91 Wheelchair clearance under lavatory apron or lavatory counter front edge less than 29" high. Provide new accessible lavatory. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 375 606.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 204 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Locker Facilities $2,2501 $2,250JOB 12" wide bench no back GG03PCODE 4.35.4ADAAG 91 No section of bench provided adjacent to designated accessible locker, measuring minimum 20-24” deep, 48” wide, and 17-19” high, and fixed to a wall along the longer dimension. Provide a new bench, fixed to a wall along the longer dimension, close to the accessible locker. • As-Built Description: • Proposed Solution: • As-Built: 380 803.4ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Semi-Ambulant Stall $5,7001 $5,700JOBWB06APCODE 4.22.4ADAAG 91 Semi-Ambulant stall with 35-37" width, minimum 60" depth, parallel grab bars, and out-swinging door not provided (one required where 6 or more exist). Provide 36" wide stall with out-swinging door and two side grab bars. Remodel restroom as needed. • As-Built Description: • Proposed Solution: 377 213.3.1 & 604.8.2ADA 2010 6 units, no semi-ambulant • Notes: Mitigated: YES NO SeverityPriority 3 2 Shower $1,5001 $1,500JOB 18" o.c. WF05BPCODEMounting height of shower spray bracket exceeds 48" max. height or is not 19" - 27" from rear edge of folding seat. Provide or remount shower spray bracket within 27" from rear edge of seat and at 48" max. height. • As-Built Description: • Proposed Solution: • As-Built: 381 608.5ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 205 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Shower $1,5001 $1,500JOB 2.6% WF06APCODEFloor surface sloped greater than 2.0% (1:48) due to drain. Remodel floor surface to compliance. • As-Built Description: • Proposed Solution: • As-Built: 383 608.9ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 206 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Women's Restroom4 Staff Only Accessories $4501 $450JOB 41" high WG03PCODE 4.19.6ADAAG 91 Bottom of mirror located above lavatories or countertops more than 40" above floor. Relocate or provide new accessible mirror. • As-Built Description: • Proposed Solution: • As-Built: 386 603.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Coat Hook $1501 $150JOB 64" high WG03APCODE 4.2.5ADAAG 91 Accessible coat hook not within reach range. Adjust existing or provide new coat hook at maximum 48" height. • As-Built Description: • Proposed Solution: • As-Built: 390 603.4ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 207 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Cooktops $1,9501 $1,950JOBKF15PCODE 13.3.4(6)ADAAG 91 Cooktop controls require reaching across the burners. Provide cooktop with accessible controls. • As-Built Description: • Proposed Solution: 33 804.6.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Swing $1501 $150JOB Door width plus 13" to bins ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 37 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Door Swing $15,0001 $15,000JOB 57" from face of door ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 384 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 3 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 208 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Grab Bars $1,0201 $1,020JOB Extends 21" from centerline of water closet WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 388 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Grab Bars $2251 $225JOBWB07IPCODE 4.26.2ADAAG 91 Accessories/dispensers in accessible stall located closer than 1-1/2" below or 12" above grab bar impedes its use. Relocate accessories/dispensers to be no closer than 1-1/2" below and 12" above grab bars (except if accessories are recessed, flush with wall, and have no sharp edges). • As-Built Description: • Proposed Solution: 389 609.3ADA 2010 Mitigated: YES NO SeverityPriority 3 4 Lavatory $10,2001 $10,200JOB Apron: 28.5" high WD03PCODE 4.19.2ADAAG 91 Wheelchair clearance under lavatory apron or lavatory counter front edge less than 29" high. Provide new accessible lavatory. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 385 606.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 209 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Reach Range $3001 $300JOB 64" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 34 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Reach Range $3001 $300JOB 70" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 35 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Reach Range $3001 $300JOB 50" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 36 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 210 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Sink $5,2501 $5,250JOBIN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: 32 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Wheelchair Clearance $5104 $2,040LF 42" wide WC02APCODE 4.3.3ADAAG 91 Clear passage width (except doorways) from rest room entry to accessible water closet compartment less than 36" (CA only: 44" wide). Modify facility passage to be min. 44" wide. Demolish existing partition and replace. • As-Built Description: • Proposed Solution: • As-Built: 387 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 211 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Staff Area5 Staff Only Door Swing $1501 $150JOB 36" from face of door to cabinet ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 38 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Public Counter $6,0001 $6,000JOB Top: 44" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 39 904.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 212 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Office Near Break Room6 Staff Only Door Swing $1501 $150JOB 36" from the face of door to desk ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 40 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 213 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Office Space Near Garage Side7 Staff Only Brochure Bins $3001 $300JOB 60" high IN08PCODE 4.2.5 & 6ADAAG 91 Information brochure bins mounted above accessible height of 48". Relocate/remount bins at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 41 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Corridor $1501 $150JOB 31" wide IH03APCODE 4.3.3ADAAG 91 Corridor, for occupant load less than 10, less than 36" wide. Remove or relocate furniture and storage items. • As-Built Description: • Proposed Solution: • As-Built: 44 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 214 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Protrusion Limits $3007 $2,100LF Shelf protrudes 4.5" at 42" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 43 307.2ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 215 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Inventory Garage8 Staff Only Door $12020 $2,400SF 3.1% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 46 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 45 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 216 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Reach Range $3001 $300JOB 52" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 47 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 First Floor $92,400.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 217 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Interior $92,400.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 218 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 6-1-1 City Yard - Maintenance Building 1 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor City Yard - Maintenance Building 1 $96,600.00Facility:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 219 City Yard - Maintenance Building 2 4305 S Santa Fe Access Compliance Survey Report City of Vernon October 2020 SSA Project #:19033.00 7Facility #: 220 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 7-0-1 Exterior- On-Site City Yard - Maintenance Building 2 4305 S SANTA FE AVE VERNON, CA 90058 CITY YARD - MAINTENANCE BUILDING 2 7-0-1 221 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 7-1-1 Interior- First Floor City Yard - Maintenance Building 2 4305 S SANTA FE AVE VERNON, CA 90058 CITY YARD - MAINTENANCE BUILDING 2 7-1-1 NO FLOOR PLANS PROVIDED 222 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor General0 Staff Only Door Closer $1,1251 $1,125JOB 10 lbs. ID03APCODE 4.13.10 &11ADAAG 91 Excessive force required to open door and/or door closing time of less than 5 seconds. Provide new door closer adjusted to accessible standards. • As-Built Description: • Proposed Solution: • As-Built: 67 404.2.8 & 404.2.9ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 223 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Hallway1 Staff Only Door $12020 $2,400SF 3.3% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 49 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Door $12015 $1,800SF 2.9% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 55 404.2.4.4ADA 2010 Southern entrance • Notes: Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 224 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Door $12020 $2,400SF 3.9% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 57 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Door Swing $15,0001 $15,000JOB Door width plus 10" to wall ID24CPCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Provide door operator. • As-Built Description: • Proposed Solution: • As-Built: 51 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Door Threshold $7501 $750JOB 0.75" high ID02PCODE 4.1.6(3)(d)(ii)ADAAG 91 Existing threshold at door is 1/2" high or less but without a beveled edge on both sides. Modify threshold to have beveled edge on each side. • As-Built Description: • Proposed Solution: • As-Built: 50 404.2.5ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 225 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Drinking Fountain $6,0001 $6,000JOBIA01APCODE 4.1.3(10)(a)ADAAG 91 Where only one drinking fountain is provided per floor: Fountain is not accessible to individuals who use wheelchairs, or to those who have difficulty bending or stooping. Provide additional fountain or hi-lo combination fountain. • As-Built Description: • Proposed Solution: 53 211.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Drinking Fountain $1,5001 $1,500JOBIA05CPCODE 4.4.1ADAAG 91 Drinking fountain lacks protection for visually impaired persons. Provide cane-detectable rails. • As-Built Description: • Proposed Solution: 54 307.2ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Electrical $9001 $900JOB 55" high IC01PCODE 4.2.5 & 6ADAAG 91 Electric switch or control mounted less than 15" measured to the bottom of the outlet box or greater than 48 inches measured to the top of the outlet box. Relocate light switches or control to between 15" and 48" height. • As-Built Description: • Proposed Solution: • As-Built: 52 308.2.1 & 308.2.2ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 226 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Protrusion Limits $3001 $300JOB Protrudes 6" at 54" high EG04PCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Remove/relocate protruding object. Patch existing surface. • As-Built Description: • Proposed Solution: • As-Built: 59 307.2ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Reach Range $3001 $300JOB 58" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 56 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Reach Range $3001 $300JOB 54"-57" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 58 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 227 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Wood Shop2 Staff Only General Note REFGN01PCODERefer to notes for observation and recommendation. • As-Built Description: • Proposed Solution: 60 No issues • Notes:Mitigated: YES NO Priority 4 0 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 228 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Plumbing Office3 Staff Only Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 61 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Sink $5,2501 $5,250JOB Knee space: 24" high IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 62 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 229 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Gym4 Staff Only Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 63 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Threshold $7501 $750JOB 0.5" high ID02PCODE 4.1.6(3)(d)(ii)ADAAG 91 Existing threshold at door is 1/2" high or less but without a beveled edge on both sides. Modify threshold to have beveled edge on each side. • As-Built Description: • Proposed Solution: • As-Built: 66 404.2.5ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 230 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Reach Range $3002 $600JOB 50" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 64 308.2.1ADA 2010 Fist aid and towels • Notes: Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 231 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Men's Bathroom5 Staff Only Accessories $3001 $300JOB 54" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 72 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Accessories $4501 $450JOB 53" high WG03PCODE 4.19.6ADAAG 91 Bottom of mirror located above lavatories or countertops more than 40" above floor. Relocate or provide new accessible mirror. • As-Built Description: • Proposed Solution: • As-Built: 71 603.3ADA 2010 Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 232 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Lavatory $10,2001 $10,200JOB Apron: 27.5" high WD03PCODE 4.19.2ADAAG 91 Wheelchair clearance under lavatory apron or lavatory counter front edge less than 29" high. Provide new accessible lavatory. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 68 606.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Lavatory $3601 $360JOBWD05PCODE 4.19.4ADAAG 91 Hot or sharp-surfaced water/drain pipe not insulated or covered. Insulate or cover water/drain pipe. • As-Built Description: • Proposed Solution: 69 606.5ADA 2010 Mitigated: YES NO SeverityPriority 3 3 Restroom ?1 $105,000JOBWA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: 74 603.1ADA 2010 Mitigated: YES NO SeverityPriority 3 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 233 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Urinal $7,2001 $7,200JOB 29" high WE02PCODE 4.18.2ADAAG 91 Fixture mounted with rim more than 17" above floor. Provide accessible urinal. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 73 605.2ADA 2010 Mitigated: YES NO SeverityPriority 3 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 234 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Yard Maintenance Storage6 Staff Only Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 75 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Swing $1501 $150JOB Door width plus 13" to cabinet ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 76 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 235 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Mechanic Area7 Staff Only Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 77 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Lab $5,4001 $5,400JOB Eye wash: 42" high LB01BPCODEMinimum of at least one of each type of sink and other specialized equipment such as fume hoods, microscopes, emergency eyewash and showers, etc, associated with the special use activity is not accessible. (CA Only) Remodel existing cabinet/counter to make specialized equipment accessible to disabled persons. • As-Built Description: • Proposed Solution: • As-Built: 83 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 236 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Protrusion Limits $30010 $3,000LFEG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: 78 307.2ADA 2010 Multiple protrusions through area • Notes: Mitigated: YES NO SeverityPriority 4 3 Public Counter $6,0001 $6,000JOB Top: 43" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 79 904.4ADA 2010 Lower if used by other staff to sign documents. • Notes: Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 237 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Public Works Office8 Staff Only Door Swing $1501 $150JOB Door width plus 3" to printer ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 80 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Non-Fixed Desk $4,8002 $9,600JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 81 306.1ADA 2010 Table inaccessible due to base. • Notes: Mitigated: YES NO SeverityPriority 4 2 First Floor $190,185.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 238 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor Interior $190,185.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 239 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 7-1-1 City Yard - Maintenance Building 2 Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa FeAddress:Year Built:TBD Floor:First Floor City Yard - Maintenance Building 2 $190,185.00Facility:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 240 Power Plant Building Corner of 50th and Seville Access Compliance Survey Report City of Vernon October 2020 SSA Project #:19033.00 8Facility #: 241 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 8-0-1 Exterior- On-Site Power Plant Building E 50TH ST AND SEVILLE AVE VERNON, CA 90058 POWER PLANT BUILDING 8-0-1 1 242 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 8-1-1 Interior- First Floor Power Plant Building E 50TH ST AND SEVILLE AVE VERNON, CA 90058 POWER PLANT BUILDING 8-1-1 NO FLOOR PLANS PROVIDED 243 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-0-1 Power Plant Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:On-site Exterior Path of Travel1 Staff Only Accessible Route $7525 $1,875SF 3.6% EF07PCODE 4.3.7ADAAG 91 Cross slope more than 1":48" (2.083%). Modify cross slope. • As-Built Description: • Proposed Solution: • As-Built: 470 403.3ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Curb Ramp $7,5001 $7,500JOBEH01PCODE 4.7.1ADAAG 91 No curb ramp available where an accessible route crosses a curb. Provide new curb ramp. • As-Built Description: • Proposed Solution: 479 303.4ADA 2010 No curb ramp access from parking • Notes: Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 244 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-0-1 Power Plant Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:On-site Door $3001 $300JOBID06PCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Provide 10" min. "kick plate" covering width of door when altering area. • As-Built Description: • Proposed Solution: 469 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Hardware $7501 $750JOB 54" high ID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: • As-Built: 471 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Swing $1,5001 $1,500JOBID23PCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Change door swing. • As-Built Description: • Proposed Solution: 472 404.2.4ADA 2010 Pave Area and relocate box • Notes: Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 245 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-0-1 Power Plant Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:On-site Handrails $28510 $2,850LF Not on both sides of stairs. ED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: • As-Built: 467 505.2ADA 2010 Employee Entrance • Notes: Mitigated: YES NO SeverityPriority 1 2 Height $22512 $2,700LF 43" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 474 505.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Minimum Number $9001 $900JOBEA01APCODE 4.1.2(5)ADAAG 91 At parking lot with 1-25 spaces, the number of accessible spaces is less than required by code; 1 space required Provide required accessible parking space with sign including a minimum of one van space. • As-Built Description: • Proposed Solution: 478 208.2ADA 2010 7 visitor spaces total, no accessible • Notes: Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 246 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-0-1 Power Plant Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:On-site Open Risers $10812 $1,296LFEC03PCODE 4.9.2ADAAG 91 Stair does not have closed risers. Modify stair to have closed risers • As-Built Description: • Proposed Solution: 473 504.3ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Ramps $30030 $9,000SF No ramp EB01APCODE 4.1.1ADAAG 91 Ramp needed to provide disabled access at steps or change of level along path of travel. Provide new concrete ramp with handrails [slope more than 1:20 (5.0%) needed]. • As-Built Description: • Proposed Solution: • As-Built: 476 303.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Reach Range $3001 $300JOB 60" high and not located on accessible level. IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 477 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 247 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-0-1 Power Plant Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:On-site Reach Range $3001 $300JOB 62" high call box IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 480 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Stairway $4240 $1,680LFII02BPCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide 2" min., 4" max. wide contrasting color strip 1" max. from nosing on top & bottom treads when altering area. • As-Built Description: • Proposed Solution: 468 504.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Top & Bottom Extension at Stairs REFED06REFPCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 475 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 248 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-0-1 Power Plant Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:On-site On-site $30,951.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 249 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-0-1 Power Plant Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:On-site Exterior $30,951.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 250 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-0 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:Basement Training Room1 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 449 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Swing $1501 $150JOBID24APCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 454 404.2.4ADA 2010 Closer and latch • Notes: Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 251 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-0 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:Basement Doormat $1,5001 $1,500JOBID05PCODE 4.5.3ADAAG 91 Doormat hinders access to disabled persons. Provide new doormat; recess or attach at edges. • As-Built Description: • Proposed Solution: 453 302.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Protrusion Limits $3001 $300JOB 4.5"-6" EG04PCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Remove/relocate protruding object. Patch existing surface. • As-Built Description: • Proposed Solution: • As-Built: 451 307.2ADA 2010 Several protrusions • Notes: Mitigated: YES NO SeverityPriority 4 4 Public Counter $6,0001 $6,000JOB Top: 36" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 452 904.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 252 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-0 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:Basement Typical Office2 Staff Only Door $7,5001 $7,500JOB 49" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 457 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Hardware $7502 $1,500JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 455 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 253 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-0 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:Basement Door Swing $1504 $600JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 456 404.2.4ADA 2010 General offices • Notes: Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 254 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-0 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:Basement Common Space3 Staff Only Lab $5,4001 $5,400JOB 59" high to eyewash LB01BPCODEMinimum of at least one of each type of sink and other specialized equipment such as fume hoods, microscopes, emergency eyewash and showers, etc, associated with the special use activity is not accessible. (CA Only) Remodel existing cabinet/counter to make specialized equipment accessible to disabled persons. • As-Built Description: • Proposed Solution: • As-Built: 460 Mitigated: YES NO SeverityPriority 4 3 Protrusion Limits $3001 $300JOBEG04PCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Remove/relocate protruding object. Patch existing surface. • As-Built Description: • Proposed Solution: 459 307.2ADA 2010 Eye wash protrusion • Notes: Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 255 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-0 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:Basement Signage $2701 $270JOBSA10APCODE 4.1.3(16)ADAAG 91 At final exit door to exterior: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT" sign at door. • As-Built Description: • Proposed Solution: 458 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Basement $23,520.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 256 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Control Room1 Staff Only Door $3001 $300JOBID06PCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Provide 10" min. "kick plate" covering width of door when altering area. • As-Built Description: • Proposed Solution: 415 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Clearance $7,8001 $7,800JOB 31" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 423 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 257 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Door Hardware $7502 $1,500JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 421 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Swing $1501 $150JOB 46" from face of door ID24APCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Remove or relocate furniture or storage items or remove closer and latch. • As-Built Description: • Proposed Solution: • As-Built: 417 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Door Swing $15,0001 $15,000JOB Closer and latch no push ID24CPCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Provide door operator. • As-Built Description: • Proposed Solution: • As-Built: 422 404.2.4ADA 2010 East side • Notes: Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 258 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Public Counter $6,0001 $6,000JOB 42" high IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 416 904.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Public Counter $6,0001 $6,000JOB 36" high counter IN03PCODE 7.2(2)ADAAG 91 Service counter (stand-up): Accessible section min. 36" length and 36" max. height (in CA: 28" to 34" high) not provided. Retrofit existing counter to provide accessible section. Interim solution: Provide auxiliary counter, table, or clipboard. • As-Built Description: • Proposed Solution: • As-Built: 420 904.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Reach Range $3001 $300JOB 55" high first aid IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 418 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 259 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Reach Range $3001 $300JOB 53" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 419 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Signage $2701 $270JOBSA10BPCODE 4.1.3(16)ADAAG 91 At door leading into exit stairway: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT STAIR UP/DOWN" sign at door. • As-Built Description: • Proposed Solution: 391 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 260 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Restroom and Locker Room2 Staff Only Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 393 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Stopper $751 $75JOBID06APCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Remove door stopper when altering area. Provide rubber wedge. • As-Built Description: • Proposed Solution: 3 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 261 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Restroom ?1 $105,000JOB No accessible stall provided. WA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: • As-Built: 395 603.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Signage $2701 $270JOBSA11APCODE 4.1.3(16)(a)ADAAG 91 Entrance to toilet or bathing facility not identified with ADAAG compliant signage. Provide ADA compliant sign mounted at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters on nearest adjacent wall, on latch side of a single door (located not to cause a Braille reader to stand within the door swing). • As-Built Description: • Proposed Solution: 392 216.8; 703.6.1ADA 2010 No signage • Notes: Mitigated: YES NO SeverityPriority 4 3 Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 2 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 262 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Urinal $7,2001 $7,200JOB 25" high WE02PCODE 4.18.2ADAAG 91 Fixture mounted with rim more than 17" above floor. Provide accessible urinal. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 394 605.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Urinal $4,5001 $4,500JOB 25" wide urinal alcove WE04PCODE 4.18.3ADAAG 91 30" x 48" clear floor space in front of accessible urinal not provided. Provide clear floor space in front of accessible urinal. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 4 605.3ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 263 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Locker Room3 Staff Only Accessories $3002 $600JOB SD: 65" high PTD: 65" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 402 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Accessories $4501 $450JOB 65" high WG03PCODE 4.19.6ADAAG 91 Bottom of mirror located above lavatories or countertops more than 40" above floor. Relocate or provide new accessible mirror. • As-Built Description: • Proposed Solution: • As-Built: 401 603.3ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 264 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Corridor $1501 $150JOB 25" wide at fixed bench IH03APCODE 4.3.3ADAAG 91 Corridor, for occupant load less than 10, less than 36" wide. Remove or relocate furniture and storage items. • As-Built Description: • Proposed Solution: • As-Built: 398 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Hardware $7501 $750JOBID07PCODE 4.13.9ADAAG 91 Door does not have accessible operating hardware. Provide lever handle or other accessible hardware. • As-Built Description: • Proposed Solution: 404 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 397 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 265 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 5 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Swing $1501 $150JOB 31" from face of door. ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 406 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Swing $15,0001 $15,000JOB Door width plus 7" to wall ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 396 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 266 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Door Swing $15,0001 $15,000JOB Door width plus 7" to wall ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 403 404.2.4ADA 2010 Door to hallway. • Notes: Mitigated: YES NO SeverityPriority 4 3 Lavatory $10,2001 $10,200JOB Knee space: 23" high WD03PCODE 4.19.2ADAAG 91 Wheelchair clearance under lavatory apron or lavatory counter front edge less than 29" high. Provide new accessible lavatory. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 400 606.3ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Locker Facilities $2,2501 $2,250JOB 12" deep GG03PCODE 4.35.4ADAAG 91 No section of bench provided adjacent to designated accessible locker, measuring minimum 20-24” deep, 48” wide, and 17-19” high, and fixed to a wall along the longer dimension. Provide a new bench, fixed to a wall along the longer dimension, close to the accessible locker. • As-Built Description: • Proposed Solution: • As-Built: 399 803.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 267 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Restroom $90,0001 $90,000JOBWA01PCODE 4.22ADAAG 91 Single accommodation restroom not accessible; multiple compliance violations. Remodel area to provide single-occupant accessible restroom. • As-Built Description: • Proposed Solution: 407 603.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Shower $12,0001 $12,000JOBWF01PCODE 4.21ADAAG 91 Shower not accessible; multiple compliance violations. Provide accessible shower. • As-Built Description: • Proposed Solution: 405 608.1ADA 2010 Shower room not accessible. • Notes:Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 268 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Exterior Stairs Near Restroom4 Staff Only Door $7,5001 $7,500JOB 48" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 6 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Handrails $28512 $3,420LFED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: 410 505.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 269 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Open Risers $10812 $1,296LFEC03PCODE 4.9.2ADAAG 91 Stair does not have closed risers. Modify stair to have closed risers • As-Built Description: • Proposed Solution: 8 504.3ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Signage $2701 $270JOBSA10BPCODE 4.1.3(16)ADAAG 91 At door leading into exit stairway: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT STAIR UP/DOWN" sign at door. • As-Built Description: • Proposed Solution: 408 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Tread Surface $2712 $324LFEC02PCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide contrasting color strips at all exterior stair treads. • As-Built Description: • Proposed Solution: 7 504.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 270 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Typical Office5 Staff Only Door $7,5005 $37,500JOB 52" high ID06CPCODEVision Light at door that permits viewing, does not have bottom of at least one glazed panel located 43 inches maximum above the finish floor. (Exception: More than 66" above finished floor.) Provide new door with vision panel at 43" max. • As-Built Description: • Proposed Solution: • As-Built: 413 404.2.11ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Hardware $7505 $3,750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 411 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 271 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Door Swing $1501 $150JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 412 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 272 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Restroom6 Staff Only Accessories $3001 $300JOB PTD: 61" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 433 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Accessories $3001 $300JOB SCD: 65" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 438 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 273 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Coat Hook $1501 $150JOB PTD: 51" high WG03APCODE 4.2.5ADAAG 91 Accessible coat hook not within reach range. Adjust existing or provide new coat hook at maximum 48" height. • As-Built Description: • Proposed Solution: • As-Built: 432 603.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door $9001 $900JOB 48" lock ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 428 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door $9001 $900JOB 58" hook ID17PCODE 4.13.9ADAAG 91 Door lock, handle or latch less than 34" or more than 48" above the floor (CA only: 34" to 44"). Relocate or replace existing hardware. • As-Built Description: • Proposed Solution: • As-Built: 429 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 274 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Door Clearance $7,8001 $7,800JOB 27" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 426 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 425 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Swing $7,8001 $7,800JOB Door width plus 9" to wall, 13" deep alcove ID23BPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide relocated new door and frame; remodel walls as needed. • As-Built Description: • Proposed Solution: • As-Built: 427 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 275 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Grab Bars $7801 $780JOB Extends 51" from rear wall SGB: 15" from wall WB07APCODE Fig. 29(b)ADAAG 91 Side grab bar less than 42" long, or located more than 12 inches max. from the rear wall, or extending less than 54" from rear wall (CA only: front end min. 24" in front of water closet). Provide or relocate accessible side grab bar. • As-Built Description: • Proposed Solution: • As-Built: 436 604.5.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Grab Bars $1,0201 $1,020JOB RGB: none WB07BPCODE 4.17.6ADAAG 91 The rear wall grab is less than 36" min. or does not extend from the centerline of the water closet 12" min. on one side and 24" min. on the other side. Provide or relocate accessible rear grab bar. • As-Built Description: • Proposed Solution: • As-Built: 437 604.5.2ADA 2010 Mitigated: YES NO SeverityPriority 4 1 Lavatory $2,7001 $2,700JOB Top: 35" high WD02APCODE 4.19.2ADAAG 91 Lavatory: Fixture rim or counter height more than 34" above floor. Remount compliant fixture at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 430 606.3ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 276 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Lavatory $10,2001 $10,200JOB 12" o.c. WD01PCODE 4.19.3ADAAG 91 Clear floor space, 30" x 48" in front of fixture, extending 19" max. under the lavatory, not provided (CA only: Less than 18" from side wall to centerline of lavatory). Provide new accessible lavatory. Remodel restroom as needed. • As-Built Description: • Proposed Solution: • As-Built: 13 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Lavatory $3601 $360JOBWD05PCODE 4.19.4ADAAG 91 Hot or sharp-surfaced water/drain pipe not insulated or covered. Insulate or cover water/drain pipe. • As-Built Description: • Proposed Solution: 431 606.5ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Protrusion Limits $3004.5 $1,350LF Protrudes 11" at 53" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 434 307.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 277 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 424 Mitigated: YES NO SeverityPriority 4 3 Water Closet $1,5001 $1,500JOBWB10PCODE 4.16.5ADAAG 91 Flush Control: Operating handle not mounted toward wide side of stall. Replace flush control with properly mounted accessible type, or install sensor flush. • As-Built Description: • Proposed Solution: 435 604.6ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 278 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Break Room7 Staff Only Cooktops $1,9501 $1,950JOB Reach over burner KF15PCODE 13.3.4(6)ADAAG 91 Cooktop controls require reaching across the burners. Provide cooktop with accessible controls. • As-Built Description: • Proposed Solution: • As-Built: 442 804.6.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Non-Fixed Desk $4,8001 $4,800JOBIN02APCODE 4.32.3 & .4ADAAG 91 Accessible non-fixed table or desk (top 28" to 34" high; knee space at least 27" high x 19" deep x 30" wide) not provided. Provide table or desk with accessible dimensions when purchasing new furniture. • As-Built Description: • Proposed Solution: 444 306.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 279 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Reach Range $3001 $300JOB 65" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 443 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Reach Range $3004 $1,200JOB >48" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: 445 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Sink $5,2501 $5,250JOB Top: 36" high IN06PCODE 4.24.2ADAAG 91 Sink rim higher than 34" above floor. Remodel sink cabinet to lower sink. • As-Built Description: • Proposed Solution: • As-Built: 441 606.3ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 280 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Sink $5,2501 $5,250JOB Knee space: none IN06APCODE 4.24.3ADAAG 91 Sink does not have knee space min. 27" high x 19" deep x 30" wide. Remodel sink cabinet. • As-Built Description: • Proposed Solution: • As-Built: 439 606.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 281 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Rear Office Entrance8 Staff Only Door $12020 $2,400SF 3.2% direction of travel ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 461 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Doormat $1,5001 $1,500JOBID05PCODE 4.5.3ADAAG 91 Doormat hinders access to disabled persons. Provide new doormat; recess or attach at edges. • As-Built Description: • Proposed Solution: 462 302.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 282 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Handrails $28510 $2,850LF Handrails non-compliant ED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not compliant at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: • As-Built: 448 505.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Signage $2701 $270JOBSA10BPCODE 4.1.3(16)ADAAG 91 At door leading into exit stairway: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT STAIR UP/DOWN" sign at door. • As-Built Description: • Proposed Solution: 22 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Top & Bottom Extension at Stairs REFED06REFPCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 447 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 283 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Pipe Room9 Staff Only Handrail $36040 $14,400LFED08APCODEGuards (42" high) not provided at side of ramp or landing where drop-off to adjacent grade or floor exceeds 30" height (California building code requirement only). Provide new guards, including handrail at ramp. • As-Built Description: • Proposed Solution: 14 Mitigated: YES NO SeverityPriority 4 4 Handrail REF 20" gaps ED08CREFPCODEOpen guards does not have balusters or ornamental patterns such that a 4-inch-diameter (102 mm) sphere cannot pass through any opening. Provide new guards which do not allow passage of an 4 inch sphere at any opening. • As-Built Description: • Proposed Solution: • As-Built: 15 405.9.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 284 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Height $22520 $4,500LF 32" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 465 505.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Top & Bottom Extension at Stairs $5101 $510JOBED06PCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 464 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Vertical Clearance $1,5001 $1,500JOB Under stair overhead clearance EG01PCODE 4.4.2ADAAG 91 Overhead clearance less than 80" above finished floor. Modify overhead clearance. • As-Built Description: • Proposed Solution: • As-Built: 463 307.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 285 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor First Floor $441,705.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 286 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Interior $465,225.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 287 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 8-1-1 Power Plant Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution Corner of 50th and SevilleAddress:Year Built:TBD Floor:First Floor Power Plant Building $496,176.00Facility:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 288 O.E. Clark Building 2716 Leonis Blvd Access Compliance Survey Report City of Vernon October 2020 SSA Project #:19033.00 9Facility #: 289 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 9-0-1 Exterior- On-Site O.E. Clark Building 2716 LEONIS BLVD VERNON, CA 90058 O.E. CLARK BUILDING 9-0-1 2 1 290 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 9-1-1 Interior- First Floor O.E. Clark Building 2716 LEONIS BLVD VERNON, CA 90058 O.E. CLARK BUILDING 9-1-1 NO FLOOR PLANS PROVIDED 291 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-0-1 O.E. Clark Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:On-site Secondary Employee Entrance1 Staff Only Height $22520 $4,500LF 32" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 305 505.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Tread Surface $27100 $2,700LF Employee entrance EC02PCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide contrasting color strips at all exterior stair treads. • As-Built Description: • Proposed Solution: • As-Built: 304 504.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 292 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-0-1 O.E. Clark Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:On-site Treads and Risers $22570 $15,750LF 5"-6" high EC07PCODEStair riser height less than 4" or more than 7". Remodel stairs as needed. • As-Built Description: • Proposed Solution: • As-Built: 306 504.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 293 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-0-1 O.E. Clark Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:On-site Parking2 Staff Only Minimum Number $9001 $900JOBEA01APCODE 4.1.2(5)ADAAG 91 At parking lot with 1-25 spaces, the number of accessible spaces is less than required by code; 1 space required Provide required accessible parking space with sign including a minimum of one van space. • As-Built Description: • Proposed Solution: 303 208.2ADA 2010 7 spaces total, no accessible • Notes: Mitigated: YES NO SeverityPriority 1 2 On-site $23,850.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 294 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-0-1 O.E. Clark Building Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:On-site Exterior $23,850.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 295 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Main Employee Entrance1 Staff Only Door $3001 $300JOBID06PCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Provide 10" min. "kick plate" covering width of door when altering area. • As-Built Description: • Proposed Solution: 300 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Doormat $1,5001 $1,500JOBID05PCODE 4.5.3ADAAG 91 Doormat hinders access to disabled persons. Provide new doormat; recess or attach at edges. • As-Built Description: • Proposed Solution: 302 302.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 296 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Ramps $30030 $9,000SF 5" step up to office level EB01APCODE 4.1.1ADAAG 91 Ramp needed to provide disabled access at steps or change of level along path of travel. Provide new concrete ramp with handrails [slope more than 1:20 (5.0%) needed]. • As-Built Description: • Proposed Solution: • As-Built: 299 303.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Reach Range $3001 $300JOB 57" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 301 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 297 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Interior Office Space2 Staff Only Electrical $9001 $900JOB 10" high IC01PCODE 4.2.5 & 6ADAAG 91 Electric switch or control mounted less than 15" measured to the bottom of the outlet box or greater than 48 inches measured to the top of the outlet box. Relocate light switches or control to between 15" and 48" height. • As-Built Description: • Proposed Solution: • As-Built: 308 308.2.1 & 308.2.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Handrails $2854 $1,140LFED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: 309 505.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 298 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Signage $2701 $270JOBSA10APCODE 4.1.3(16)ADAAG 91 At final exit door to exterior: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT" sign at door. • As-Built Description: • Proposed Solution: 307 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Stairway $428 $336LFII02BPCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide 2" min., 4" max. wide contrasting color strip 1" max. from nosing on top & bottom treads when altering area. • As-Built Description: • Proposed Solution: 310 504.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 299 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Office/Break Room3 Staff Only Corridor $1501 $150JOB 25" wide IH03APCODE 4.3.3ADAAG 91 Corridor, for occupant load less than 10, less than 36" wide. Remove or relocate furniture and storage items. • As-Built Description: • Proposed Solution: • As-Built: 312 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Swing $1501 $150JOBID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: 311 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 300 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Office4 Staff Only Door Clearance $7,8001 $7,800JOB 27" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 313 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 314 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 301 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Conference Room5 Staff Only Assistive Listening REFGI01EPCODE 4.1.3(19)(b) & 4.33.7 ADAAG 91 No portable assistive listening system provided for small meeting room. Share existing portable assistive listening system from other facility. • As-Built Description: • Proposed Solution: 318 219.1 & 706.1 ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Assistive Listening $3001 $300JOBGI02PCODE 4.1.3(19)(b)ADAAG 91 No signs at the building or assembly area entrance to notify patrons that an assistive listening system is available. Provide assistive listening signage. • As-Built Description: • Proposed Solution: 319 703.7.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 302 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Door Clearance $7,8001 $7,800JOB 27" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 315 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 2 2 Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 316 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 2 3 Door Swing $15,0001 $15,000JOB 41" from face of door ID24CPCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Provide door operator. • As-Built Description: • Proposed Solution: • As-Built: 317 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 2 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 303 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Protrusion Limits $3005 $1,500LF TV protrudes 4.5" at 56" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 320 307.2ADA 2010 Mitigated: YES NO SeverityPriority 2 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 304 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Men's Restroom6 Staff Only Door Clearance $7,8001 $7,800JOB 27" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 321 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Restroom $90,0001 $90,000JOBWA01PCODE 4.22ADAAG 91 Single accommodation restroom not accessible; multiple compliance violations. Remodel area to provide single-occupant accessible restroom. • As-Built Description: • Proposed Solution: 325 603.1ADA 2010 30" in front of toilet, 16" oc, no turning space, no accessories • Notes: Mitigated: YES NO SeverityPriority 3 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 305 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Signage $2701 $270JOBSA11APCODE 4.1.3(16)(a)ADAAG 91 Entrance to toilet or bathing facility not identified with ADAAG compliant signage. Provide ADA compliant sign mounted at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters on nearest adjacent wall, on latch side of a single door (located not to cause a Braille reader to stand within the door swing). • As-Built Description: • Proposed Solution: 322 216.8; 703.6.1ADA 2010 Must be unisex • Notes: Mitigated: YES NO SeverityPriority 3 3 Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 323 Must be unisex • Notes: Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 306 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Women's Restroom7 Staff Only Restroom $90,0001 $90,000JOBWA01PCODE 4.22ADAAG 91 Single accommodation restroom not accessible; multiple compliance violations. Remodel area to provide single-occupant accessible restroom. • As-Built Description: • Proposed Solution: 328 603.1ADA 2010 Mitigated: YES NO SeverityPriority 3 2 Signage $2701 $270JOBSA11APCODE 4.1.3(16)(a)ADAAG 91 Entrance to toilet or bathing facility not identified with ADAAG compliant signage. Provide ADA compliant sign mounted at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters on nearest adjacent wall, on latch side of a single door (located not to cause a Braille reader to stand within the door swing). • As-Built Description: • Proposed Solution: 326 216.8; 703.6.1ADA 2010 Must be unisex • Notes: Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 307 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 327 Must be unisex • Notes: Mitigated: YES NO SeverityPriority 3 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 308 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Stairs to Upper Warehouse8 Staff Only Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 334 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Door Stopper $751 $75JOBID06APCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Remove door stopper when altering area. Provide rubber wedge. • As-Built Description: • Proposed Solution: 335 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 309 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Handrails $2856 $1,710LFED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: 330 505.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Reach Range $3001 $300JOB 55" high to doorbell IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 336 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Stairway $428 $336LFII02BPCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide 2" min., 4" max. wide contrasting color strip 1" max. from nosing on top & bottom treads when altering area. • As-Built Description: • Proposed Solution: 333 504.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 310 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Top & Bottom Extension at Stairs $5102 $1,020JOBED06PCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 332 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 311 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Warehouse Restroom9 Staff Only Accessories $3002 $600JOB SD: 41" high PTD: 53" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 340 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Accessories $4501 $450JOB 48" high WG03PCODE 4.19.6ADAAG 91 Bottom of mirror located above lavatories or countertops more than 40" above floor. Relocate or provide new accessible mirror. • As-Built Description: • Proposed Solution: • As-Built: 341 603.3ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 312 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Coat Hook $1501 $150JOB 65" high WG03APCODE 4.2.5ADAAG 91 Accessible coat hook not within reach range. Adjust existing or provide new coat hook at maximum 48" height. • As-Built Description: • Proposed Solution: • As-Built: 343 603.4ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Clearance $7,8001 $7,800JOB 27" clear opening width ID01PCODE 4.13.5ADAAG 91 Door on accessible route has less than 32" clear and 80" (78" min. to closer if provided) opening width when 90° open. Provide new, larger door and frame with new accessible hardware. • As-Built Description: • Proposed Solution: • As-Built: 337 404.2.3ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Door Hardware $7501 $750JOBID07CPCODE 4.13.9ADAAG 91 Non-common use areas within this facility, such as offices, do not have accessible door hardware. Provide lever handle or other accessible hardware when a specific need is identified in the future or when altering area. • As-Built Description: • Proposed Solution: 338 404.2.7ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 313 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Fixed Bench $1,5001 $1,500JOB Bench and locker not accessible. NO02PCODE 16.12.1ADAAG 91 Single fixed bench provided is not accessible. Provide additional accessible bench or replace. • As-Built Description: • Proposed Solution: • As-Built: 345 903.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Lavatory $3601 $360JOBWD05PCODE 4.19.4ADAAG 91 Hot or sharp-surfaced water/drain pipe not insulated or covered. Insulate or cover water/drain pipe. • As-Built Description: • Proposed Solution: 339 606.5ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Restroom ?1 $105,000JOBWA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: 344 603.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 314 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Shower $12,0001 $12,000JOBWF01PCODE 4.21ADAAG 91 Shower not accessible; multiple compliance violations. Provide accessible shower. • As-Built Description: • Proposed Solution: 342 608.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Signage $2701 $270JOBSA11APCODE 4.1.3(16)(a)ADAAG 91 Entrance to toilet or bathing facility not identified with ADAAG compliant signage. Provide ADA compliant sign mounted at 48" min. above to baseline of the lowest Braille cells and 60" max. to baseline of the highest line of raised characters on nearest adjacent wall, on latch side of a single door (located not to cause a Braille reader to stand within the door swing). • As-Built Description: • Proposed Solution: 347 216.8; 703.6.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Signage $2701 $270JOBSA15PCODERequired in CA only: identification symbol centered 58" to 60" high on sanitary facility door that contrasts with the door not provided (women: 12" ø circle, men: 12" triangle, unisex: combined symbol). Provide properly mounted sanitary facility symbol when altering area. If wheelchair accessible, include International Symbol of Accessibility on sign. • As-Built Description: • Proposed Solution: 348 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 315 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Warehouse Restroom10 Staff Only Accessories $3002 $600JOB PTD: 48"-57" high WG01APCODE 4.23.7ADAAG 91 Dispensers in sanitary facilities, such as for towels, soap, sanitary napkins, seat covers, etc., and waste receptacles more than 48" (CA only: 40") from floor to highest operating slot or control. Relocate existing restroom accessories. • As-Built Description: • Proposed Solution: • As-Built: 350 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Lavatory $2,7001 $2,700JOB Top: 36" high WD02APCODE 4.19.2ADAAG 91 Lavatory: Fixture rim or counter height more than 34" above floor. Remount compliant fixture at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 351 606.3ADA 2010 Mitigated: YES NO SeverityPriority 4 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 316 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Lavatory $3601 $360JOBWD05PCODE 4.19.4ADAAG 91 Hot or sharp-surfaced water/drain pipe not insulated or covered. Insulate or cover water/drain pipe. • As-Built Description: • Proposed Solution: 352 606.5ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Restroom ?1 $105,000JOBWA01APCODE 4.22ADAAG 91 Multiple accommodation restroom not accessible; multiple compliance violations. Remodel area to provide accessible restroom with one accessible stall, lavatory (and one urinal at Mens). • As-Built Description: • Proposed Solution: 349 603.1ADA 2010 Mitigated: YES NO SeverityPriority 4 1 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 317 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Main Warehouse11 Staff Only Handrail $36010 $3,600LFED08APCODEGuards (42" high) not provided at side of ramp or landing where drop-off to adjacent grade or floor exceeds 30" height (California building code requirement only). Provide new guards, including handrail at ramp. • As-Built Description: • Proposed Solution: 360 Mitigated: YES NO SeverityPriority 4 2 Handrails $28510 $2,850LFED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: 358 505.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 318 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Handrails $28510 $2,850LFED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: 363 505.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Handrails $28510 $2,850LFED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: 365 505.2ADA 2010 Mitigated: YES NO SeverityPriority 4 2 Minimum Number $9001 $900JOB Warehouse employee parking EA01APCODE 4.1.2(5)ADAAG 91 At parking lot with 1-25 spaces, the number of accessible spaces is less than required by code; 1 space required Provide required accessible parking space with sign including a minimum of one van space. • As-Built Description: • Proposed Solution: • As-Built: 355 208.2ADA 2010 No accessible spaces • Notes: Mitigated: YES NO SeverityPriority 4 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 319 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Protrusion Limits $3001 $300JOB General protrusions throughout EG04PCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Remove/relocate protruding object. Patch existing surface. • As-Built Description: • Proposed Solution: • As-Built: 361 307.2ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Reach Range $3001 $300JOB 56" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 354 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Signage $2701 $270JOBSA10APCODE 4.1.3(16)ADAAG 91 At final exit door to exterior: Where required exit signs are installed, signs to provide exiting information for people with vision impairment are not provided. Provide raised letter/Braille "EXIT" sign at door. • As-Built Description: • Proposed Solution: 357 216.4.1ADA 2010 Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 320 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Stairway $4210 $420LFII02BPCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide 2" min., 4" max. wide contrasting color strip 1" max. from nosing on top & bottom treads when altering area. • As-Built Description: • Proposed Solution: 364 504.4ADA 2010 Mitigated: YES NO SeverityPriority 4 3 Tread Surface $2712 $324LFEC02PCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide contrasting color strips at all exterior stair treads. • As-Built Description: • Proposed Solution: 359 504.4ADA 2010 Mitigated: YES NO SeverityPriority 4 4 Walk $75100 $7,500SF 11.9% EF01PCODE 4.3.7ADAAG 91 Walk: Slope greater than 1:20 (5.0%), and walk does not comply with requirements for ramps. Modify walk/sidewalk slope to 1:20 or less. • As-Built Description: • Proposed Solution: • As-Built: 353 403.3ADA 2010 Only route to upper ware house via vehicles ramp. • Notes: Mitigated: YES NO SeverityPriority 4 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 321 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Walk $7520 $1,500SF 6.6% direction of travel EF01PCODE 4.3.7ADAAG 91 Walk: Slope greater than 1:20 (5.0%), and walk does not comply with requirements for ramps. Modify walk/sidewalk slope to 1:20 or less. • As-Built Description: • Proposed Solution: • As-Built: 362 403.3ADA 2010 Path of travel to storage "office" • Notes: Mitigated: YES NO SeverityPriority 4 4 First Floor $502,491.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 322 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor Interior $502,491.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 323 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 9-1-1 O.E. Clark Building Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 2716 Leonis BlvdAddress:Year Built:TBD Floor:First Floor O.E. Clark Building $526,341.00Facility:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 324 Apartment Complex 3380 E 50th St Access Compliance Survey Report City of Vernon October 2020 SSA Project #:19033.00 10Facility #: 325 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number 10-0-1 Exterior- On-Site Apartment Complex 3380 E 50TH ST VERNON, CA 90058 APARTMENT COMPLEX 10-0-1 5 6 3 1 2 4 7 326 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Guest Parking1 Staff Only Floor or Ground Surfaces $36150 $5,400SF 3.0% EA05PCODE 4.6.3ADAAG 91 Accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space. • As-Built Description: • Proposed Solution: • As-Built: 7 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $6001 $600JOB 8'10" wide EA02APCODE 4.6.3ADAAG 91 Accessible parking space smaller than 8' wide (CA only: 9' x 18'). Modify parking space(s) to create accessible space. • As-Built Description: • Proposed Solution: • As-Built: 3 502.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 327 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Parking $3001 $300JOB Faded EA04DPCODEThe words "NO PARKING" not painted on the ground within loading and unloading access aisle (12" min high white letters), located so that it is visible to traffic enforcement officials (required in CA only). Provide the words “NO PARKING” in each access aisle, painted in 12” high letters, when altering area. • As-Built Description: • Proposed Solution: • As-Built: 4 Mitigated: YES NO SeverityPriority 1 4 Parking $1351 $135JOB 48" high EA04HPCODE 4.6.4ADAAG 91 Parking sign is not located between 60" and 80" above the finish floor or ground surface measured to the bottom of the sign. Remount existing sign at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 6 502.7ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking Signage $9751 $975JOB Language incorrect EA04CPCODENo "Tow Away" sign at parking lot entrance (required in CA only). Provide "Tow Away" sign at parking lot entrance when altering area. • As-Built Description: • Proposed Solution: • As-Built: 2 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 328 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Parking Signage $3001 $300JOBEA04GPCODECA only: Additional Sign or additional language below the symbol of accessibility stating “Minimum Fine $250” not provided. Provide compliant parking signage that includes fine information. • As-Built Description: • Proposed Solution: 5 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 329 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Entrance2 Staff Only Door $3001 $300JOBID06PCODEAt push side of door on accessible route, bottom 10" does not have a smooth, uninterrupted surface. Provide 10" min. "kick plate" covering width of door when altering area. • As-Built Description: • Proposed Solution: 10 404.2.10ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Swing $15,0001 $15,000JOB Door width plus 16" to wall ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 9 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 330 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Private Accessible Parking3 Staff Only Clear Width $3001 $300JOB 30" wide between fence and parking stall EG03PCODE 4.2.1ADAAG 91 Obstacle reduces width of path of travel to less than 36"clearance. Provide 36" width between obstacles. Relocate obstacles; patch existing surface if needed. • As-Built Description: • Proposed Solution: • As-Built: 14 403.5.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Floor or Ground Surfaces $3650 $1,800SF 3.0% EA05BPCODE 4.6.3ADAAG 91 Access aisle at accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space aisle. • As-Built Description: • Proposed Solution: • As-Built: 13 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 331 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Parking $1351 $135JOB 48" high EA04HPCODE 4.6.4ADAAG 91 Parking sign is not located between 60" and 80" above the finish floor or ground surface measured to the bottom of the sign. Remount existing sign at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 12 502.7ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking Signage $3001 $300JOBEA04GPCODECA only: Additional Sign or additional language below the symbol of accessibility stating “Minimum Fine $250” not provided. Provide compliant parking signage that includes fine information. • As-Built Description: • Proposed Solution: 11 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 332 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Path of Travel Near Laundry Room4 Staff Only Walk $7535 $2,625SF 7.4% EF01PCODE 4.3.7ADAAG 91 Walk: Slope greater than 1:20 (5.0%), and walk does not comply with requirements for ramps. Modify walk/sidewalk slope to 1:20 or less. • As-Built Description: • Proposed Solution: • As-Built: 15 403.3ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 333 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Courtyard and 50th Gate5 Staff Only Changes in Level $631 $63SF 1" high EF03PCODE 4.3.8ADAAG 91 Walk: Pavement dislocation creates abrupt change in level exceeding 1/2" in accessible route. Remove, replace or repair area of pavement sufficient to correct abrupt change in level. • As-Built Description: • Proposed Solution: • As-Built: 17 403.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Door $12025 $3,000SF 3.7% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 18 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 334 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Door $12012 $1,440SF 4.2% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 20 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Door Swing $1501 $150JOB 24" from face of door to mail box ID23APCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Remove or relocate furniture or storage items. • As-Built Description: • Proposed Solution: • As-Built: 23 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Door Swing $7,8001 $7,800JOB Unpaved ID24BPCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Pave 12" strike landing at door. • As-Built Description: • Proposed Solution: • As-Built: 19 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 335 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Protrusion Limits $3003 $900LF Mail box protrudes 12" at 30" high EG04APCODE 4.4.1ADAAG 91 Protruding objects more than 4" from wall, when bottom of object more than 27" or less than 80" above finished floor. Provide cane-detectable railing to mark area of low clearance. • As-Built Description: • Proposed Solution: • As-Built: 22 307.2ADA 2010 Mitigated: YES NO SeverityPriority 1 1 Reach Range $3001 $300JOB 52" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 16 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Reach Range $3001 $300JOB 57" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 21 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 336 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Reach Range $3001 $300JOB 56" high IE01PCODE 4.2.5ADAAG 91 Reach height to control or access point, exceeds 48" or is less than 15". Modify equipment or mounting. • As-Built Description: • Proposed Solution: • As-Built: 29 308.2.1ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 337 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Typical Stairs6 Staff Only Handrails $28512 $3,420LF One side only ED01PCODE 4.8.5 & 4.9.4ADAAG 91 Handrail not provided at stairs or ramp, required on both sides (not required at curb ramps or adjacent to seating areas). Provide new handrail for each side including extensions. • As-Built Description: • Proposed Solution: • As-Built: 27 505.2ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Open Risers $108400 $43,200LFEC03PCODE 4.9.2ADAAG 91 Stair does not have closed risers. Modify stair to have closed risers • As-Built Description: • Proposed Solution: 24 504.3ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 338 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Top & Bottom Extension at Stairs $5108 $4,080JOBED06PCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 26 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Tread Surface $27300 $8,100LFEC02PCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide contrasting color strips at all exterior stair treads. • As-Built Description: • Proposed Solution: 25 504.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 339 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Trash Enclosure7 Staff Only Door Swing $7,8001 $7,800JOBID24BPCODE Fig. 25(a)ADAAG 91 Front approach: At push side, door does not have clear and level maneuvering space measuring door width x 48" (door width plus 12" if door has both, latch and closer). Provide relocated new door and frame; remodel walls as needed. • As-Built Description: • Proposed Solution: 30 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Turning Space $1,5001 $1,500JOB 58" wide, no turn space IH05PCODEThe area does not provide a minimum 60" diameter turning space within to allow maneuvering through the space. Modify area to provide sufficient maneuvering space. • As-Built Description: • Proposed Solution: • As-Built: 31 304.3ADA 2010 Mitigated: YES NO SeverityPriority 1 3 On-site $110,523.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 340 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Exterior $110,523.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 341 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 10-0-1 Apartment Complex Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 3380 E 50th StAddress:Year Built:TBD Floor:On-site Apartment Complex $110,523.00Facility:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 342 City Parking Structure 4305 S Santa Fe Ave Access Compliance Survey Report City of Vernon October 2020 SSA Project #:19033.00 11Facility #: 343 Location: Facility: BARRIER LOCATION MAP 1 Prepared By: Project #: Date: Sheet: REF NORTH N.T.S. 19033 10-21-2020 Sally Swanson Architects San Francisco, CA Item Number CITY HALL PARKING STRUCTURE 4305 S. SANTA FE AVE VERNON, CA 90058 Exterior- On-site City Hall Parking Structure11-0-1 66 4 5 2 3 6 344 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Accessible Parking2 Staff Only Floor or Ground Surfaces $36100 $3,600SF 3.1% EA05PCODE 4.6.3ADAAG 91 Accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space. • As-Built Description: • Proposed Solution: • As-Built: 482 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Floor or Ground Surfaces $36100 $3,600SF 3.2% EA05BPCODE 4.6.3ADAAG 91 Access aisle at accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space aisle. • As-Built Description: • Proposed Solution: • As-Built: 483 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 345 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking $6001 $600JOB 8' wide EA02APCODE 4.6.3ADAAG 91 Accessible parking space smaller than 8' wide (CA only: 9' x 18'). Modify parking space(s) to create accessible space. • As-Built Description: • Proposed Solution: • As-Built: 484 502.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $6001 $600JOB 17' long EA02APCODE 4.6.3ADAAG 91 Accessible parking space smaller than 8' wide (CA only: 9' x 18'). Modify parking space(s) to create accessible space. • As-Built Description: • Proposed Solution: • As-Built: 485 502.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the ground within loading and unloading access aisle (12" min high white letters), located so that it is visible to traffic enforcement officials (required in CA only). Provide the words “NO PARKING” in each access aisle, painted in 12” high letters, when altering area. • As-Built Description: • Proposed Solution: 486 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 346 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking $1351 $135JOB 13" high EA04HPCODE 4.6.4ADAAG 91 Parking sign is not located between 60" and 80" above the finish floor or ground surface measured to the bottom of the sign. Remount existing sign at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 487 502.7ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking Signage $3001 $300JOBEA04GPCODECA only: Additional Sign or additional language below the symbol of accessibility stating “Minimum Fine $250” not provided. Provide compliant parking signage that includes fine information. • As-Built Description: • Proposed Solution: 488 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 347 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Accessible Parking3 Staff Only Floor or Ground Surfaces $36200 $7,200SF 2.7%- 3.2% EA05PCODE 4.6.3ADAAG 91 Accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space. • As-Built Description: • Proposed Solution: • As-Built: 489 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Floor or Ground Surfaces $36200 $7,200SF 3.2% EA05PCODE 4.6.3ADAAG 91 Accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space. • As-Built Description: • Proposed Solution: • As-Built: 491 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 348 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Floor or Ground Surfaces $36250 $9,000SF 3.0% EA05BPCODE 4.6.3ADAAG 91 Access aisle at accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space aisle. • As-Built Description: • Proposed Solution: • As-Built: 490 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 General Note REF Remove Van sign GN01PCODERefer to notes for observation and recommendation. • As-Built Description: • Proposed Solution: • As-Built: 496 Mitigated: YES NO Priority 1 0 Parking $6002 $1,200JOB 17'6" long EA02APCODE 4.6.3ADAAG 91 Accessible parking space smaller than 8' wide (CA only: 9' x 18'). Modify parking space(s) to create accessible space. • As-Built Description: • Proposed Solution: • As-Built: 493 502.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 349 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking $6001 $600JOB 4'8" wide EA02BPCODE 4.6.3ADAAG 91 Accessible parking space does not have 5' wide access aisle; 8' wide for van accessible aisle. Modify parking aisle(s) to create accessible space by restriping. • As-Built Description: • Proposed Solution: • As-Built: 492 502.3ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $2,1901 $2,190JOBEA03PCODE Fig.9ADAAG 91 Disabled persons must wheel or walk behind parked car(s) other than their own. Relocate parking and provide curb ramp to accessible route. • As-Built Description: • Proposed Solution: 498 502.3ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Parking $3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the ground within loading and unloading access aisle (12" min high white letters), located so that it is visible to traffic enforcement officials (required in CA only). Provide the words “NO PARKING” in each access aisle, painted in 12” high letters, when altering area. • As-Built Description: • Proposed Solution: 497 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 350 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking $1351 $135JOB 14" high EA04HPCODE 4.6.4ADAAG 91 Parking sign is not located between 60" and 80" above the finish floor or ground surface measured to the bottom of the sign. Remount existing sign at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 495 502.7ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking Signage $3002 $600JOBEA04GPCODECA only: Additional Sign or additional language below the symbol of accessibility stating “Minimum Fine $250” not provided. Provide compliant parking signage that includes fine information. • As-Built Description: • Proposed Solution: 494 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 351 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Accessible Parking4 Staff Only Floor or Ground Surfaces $36300 $10,800SF 5.7% EA05PCODE 4.6.3ADAAG 91 Accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space. • As-Built Description: • Proposed Solution: • As-Built: 499 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 Floor or Ground Surfaces $36200 $7,200SF 3.2% EA05BPCODE 4.6.3ADAAG 91 Access aisle at accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space aisle. • As-Built Description: • Proposed Solution: • As-Built: 500 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 352 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking $6001 $600JOB 7' wide EA02BPCODE 4.6.3ADAAG 91 Accessible parking space does not have 5' wide access aisle; 8' wide for van accessible aisle. Modify parking aisle(s) to create accessible space by restriping. • As-Built Description: • Proposed Solution: • As-Built: 501 502.3ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $1351 $135JOB 15" high EA04HPCODE 4.6.4ADAAG 91 Parking sign is not located between 60" and 80" above the finish floor or ground surface measured to the bottom of the sign. Remount existing sign at accessible height. • As-Built Description: • Proposed Solution: • As-Built: 502 502.7ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 353 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Accessible Parking5 Staff Only Floor or Ground Surfaces $36100 $3,600SF 2.7% - 3.0% EA05PCODE 4.6.3ADAAG 91 Accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space. • As-Built Description: • Proposed Solution: • As-Built: 503 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Floor or Ground Surfaces $36250 $9,000SF 3.0% EA05BPCODE 4.6.3ADAAG 91 Access aisle at accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space aisle. • As-Built Description: • Proposed Solution: • As-Built: 504 502.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 354 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking $6001 $600JOB 17' long EA02APCODE 4.6.3ADAAG 91 Accessible parking space smaller than 8' wide (CA only: 9' x 18'). Modify parking space(s) to create accessible space. • As-Built Description: • Proposed Solution: • As-Built: 505 502.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the ground within loading and unloading access aisle (12" min high white letters), located so that it is visible to traffic enforcement officials (required in CA only). Provide the words “NO PARKING” in each access aisle, painted in 12” high letters, when altering area. • As-Built Description: • Proposed Solution: 507 Mitigated: YES NO SeverityPriority 1 4 Parking Signage $3001 $300JOBEA04GPCODECA only: Additional Sign or additional language below the symbol of accessibility stating “Minimum Fine $250” not provided. Provide compliant parking signage that includes fine information. • As-Built Description: • Proposed Solution: 506 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 355 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site EV Charging6 Staff Only General Note REFGN01PCODERefer to notes for observation and recommendation. • As-Built Description: • Proposed Solution: 508 6 total, no accessible EV Charging • Notes:Mitigated: YES NO Priority 1 0 Handrail $36030 $10,800LF 41.5" high guardrail ED08APCODEGuards (42" high) not provided at side of ramp or landing where drop-off to adjacent grade or floor exceeds 30" height (California building code requirement only). Provide new guards, including handrail at ramp. • As-Built Description: • Proposed Solution: • As-Built: 511 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 356 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Height $225120 $27,000LF 31.5" - 32" high ED02PCODE 4.9.4(5)ADAAG 91 Handrail gripping surface top not mounted between 34" and 38" above ramp surface or stair nosings. Remove existing and provide new handrail. • As-Built Description: • Proposed Solution: • As-Built: 512 505.4ADA 2010 3 Total Stairs • Notes: Mitigated: YES NO SeverityPriority 1 3 Top & Bottom Extension at Stairs $5108 $4,080JOBED06PCODE 4.9.4(2)ADAAG 91 Stair handrail does not extend horizontally 12" minimum beyond top nosing, and one tread width sloped, plus 12" minimum horizontally beyond the bottom nosing. Extend stair handrail at top and bottom (cost for each extension piece). • As-Built Description: • Proposed Solution: 510 505.10.2; 505.10.3ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Tread Surface $27220 $5,940LFEC02PCODEThe leading 2" of the tread does not have visual contrast of dark–on–light or light–on–dark from the remainder of the tread. Provide contrasting color strips at all exterior stair treads. • As-Built Description: • Proposed Solution: 509 504.4ADA 2010 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 357 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site On-site $117,915.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 358 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-0-1 City Parking Structure Part:Exterior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Exterior $117,915.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 359 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:Ground Floor Lower Parking1 Staff Only Minimum Number $9001 $900JOB 106 total spaces, no accessible EA01DPCODE 4.1.2(5)*ADAAG 91 At parking lot with 76-100 spaces, the number of accessible spaces is less than required by code; 4 spaces required. Provide required accessible parking spaces with signs including a minimum of one van space. • As-Built Description: • Proposed Solution: • As-Built: 513 208.2ADA 2010 Mitigated: YES NO SeverityPriority 1 2 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 360 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site EntryXx Staff Only Door $12025 $3,000SF 7.5% ID11PCODE 4.13.6ADAAG 91 Surface of required maneuvering clearance at door slopes more than 1/4":12" (2.0%). Modify surface slope at door. • As-Built Description: • Proposed Solution: • As-Built: 92 404.2.4.4ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Door Swing $15,0001 $15,000JOB 53" from face of door ID23CPCODE Fig. 25(a)ADAAG 91 Front approach: At pull side, door does not have clear and level maneuvering space measuring door width plus 18" x 60". (24" x 60" at exterior doors). Provide power door operator. • As-Built Description: • Proposed Solution: • As-Built: 94 404.2.4ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 361 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Floor or Ground Surfaces $36100 $3,600SFEA05PCODE 4.6.3ADAAG 91 Accessible parking space has slope greater than 1/4":12" (2%). Modify slope at accessible parking space. • As-Built Description: • Proposed Solution: 90 502.4ADA 2010 Curb ramp within access aisle. • Notes:Mitigated: YES NO SeverityPriority 1 2 Minimum Number $9001 $900JOB 4 EV charging stations, No Accessible EA01APCODE 4.1.2(5)ADAAG 91 At parking lot with 1-25 spaces, the number of accessible spaces is less than required by code; 1 space required Provide required accessible parking space with sign including a minimum of one van space. • As-Built Description: • Proposed Solution: • As-Built: 91 208.2ADA 2010 Mitigated: YES NO SeverityPriority 1 2 Minimum Number REFEA01BREFPCODE 4.1.2(5)*ADAAG 91 At parking lot with 26-50 spaces, the number of accessible spaces is less than required by code; 2 spaces required. Provide required accessible parking spaces with signs including a minimum of one van space. • As-Built Description: • Proposed Solution: 85 208.2ADA 2010 39 spaces, 2 accessible • Notes: Mitigated: YES NO Priority 1 0 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 362 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking $6001 $600JOB 8' wide EA02APCODE 4.6.3ADAAG 91 Accessible parking space smaller than 8' wide (CA only: 9' x 18'). Modify parking space(s) to create accessible space. • As-Built Description: • Proposed Solution: • As-Built: 87 502.2ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $6001 $600JOB 7'4" wide EA02BPCODE 4.6.3ADAAG 91 Accessible parking space does not have 5' wide access aisle; 8' wide for van accessible aisle. Modify parking aisle(s) to create accessible space by restriping. • As-Built Description: • Proposed Solution: • As-Built: 88 502.3ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Parking $3001 $300JOBEA04DPCODEThe words "NO PARKING" not painted on the ground within loading and unloading access aisle (12" min high white letters), located so that it is visible to traffic enforcement officials (required in CA only). Provide the words “NO PARKING” in each access aisle, painted in 12” high letters, when altering area. • As-Built Description: • Proposed Solution: 89 Mitigated: YES NO SeverityPriority 1 4 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 363 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Parking Signage $3002 $600JOBEA04GPCODECA only: Additional Sign or additional language below the symbol of accessibility stating “Minimum Fine $250” not provided. Provide compliant parking signage that includes fine information. • As-Built Description: • Proposed Solution: 86 Mitigated: YES NO SeverityPriority 1 4 Ramp $22530 $6,750LF 6.2% EB03PCODE 4.8.1ADAAG 91 Slope not steep but greater than 1:20 (5.0 %) without handrails. Provide handrails for ramp. • As-Built Description: • Proposed Solution: • As-Built: 95 405.1ADA 2010 Mitigated: YES NO SeverityPriority 1 4 Ramp $13510 $1,350SF 4.2% EB07APCODETop landing less than 60" long. (CA only: 60" x 60"). Modify ramp top landing to 60" in length and 60" wide. • As-Built Description: • Proposed Solution: • As-Built: 97 405.7.3ADA 2010 Mitigated: YES NO SeverityPriority 1 3 October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 364 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Slope $30012 $3,600SF 2.7% EB05APCODE 4.8.4ADAAG 91 Level 2% max. landing for ramp not provided. Rebuild ramp to provide landings for each ramp run with slopes no greater than 2% • As-Built Description: • Proposed Solution: • As-Built: 96 405.7.1ADA 2010 Mitigated: YES NO SeverityPriority 1 4 On-site $37,200.00Floor:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 365 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site Interior $37,200.00Area:Conceptual Costs for October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 366 Qty TotalUnit CostCodes / Mitigation Info Access Compliance Survey Report Facility: 11-1-1 City Parking Structure Part:Interior City of Vernon Item no., Rm no. and Name Existing Architectural Barrier and Proposed Solution 4305 S Santa Fe AveAddress:Year Built:TBD Floor:On-site City Parking Structure $155,115.00Facility:Conceptual Costs for $3,383,616.00Conceptual Costs for City of Vernon October 2020 19033.00S a l l y S w a n s o n A r c h i t e c t s , I n c . P r o j e c t # 367 City of Vernon- Sidewalks October 2020 SSA Project # 19033 Access Compliance Survey Report Appendix B: Sidewalks City of Vernon 368 SSA Project # 19033 City of Vernon - Sidewalks - ACS Report October 2020 TABLE OF CONTENTS I. Access Compliance Survey Report i. Report Navigation and Legend, Abbreviations ii. Master Street List iii. Cost Summary II. Survey Data for Sidewalks i. Survey Data 369 SSA Project # 19033 City of Vernon - Sidewalks - ACS Report October 2020 NAVIGATION & LEGEND 370 1. Street Side: Corresponds to the side of the street surveyed: - N, S, E and W. 2. Dist. from Corner: The location of the identified barrier, measured in feet from the intersection/starting street. 3. Survey Street: Name of arterial/primary Street for which barriers are being surveyed. 4. Barrier Type: Type of Barrier recorded. 5. Starting Street: Name of the intersecting starting street from which barrier locations are being measured. 6. Measurement: Existing condition/dimension. 7. Sidewalk Width: Width of the sidewalk measured in feet. 8. Qty: Number of solutions required. 9. End Street: Name of the intersecting ending street from which barrier locations are being measured. 10. Unit: Unit of measurement used to compute estimate. LF=linear feet; SF=square feet; JOB=lump sum; REF=reference 11. Cost Estimated cost of specific solution per one unit (The final cost of barrier removal may exceed this estimate based on the year of mitigation, design approach, and chosen method of mitigation.12. Total: Total estimated cost for removing identified barrier (multiplied Qty by Cost). 13. Priority: Priority number assigned to specific barrier based on priorization criteria which include: expected frequency of use and severity of the barrier. Measureed on a scale of 0 to 200, with 200 being the highest priority and 0 being the least. SSA Project # 19033 City of Vernon - Sidewalks - ACS Report October 2020 43 521 126711 NAVIGATION 8 9 10 13 371 SSA Project # 19033 City of Vernon - Sidewalks - ACS Report October 2020 ADA Americans with Disabilities Act ADAAG ADA Accessibility Guidelines E East Fig. Figure JOB per one job (lump sum) lbs. Pounds LF Linear foot MUTCD Manual on Uniform Traffic Control Devices N North NE Northeast NW Northwest POT Path of travel PROW Public Right-of-Way PROWAG Public Right-of-Way Accesible Guidelines Qty Quantity REF Reference; Provided in locations with overlapping issue; indicates no addition cost required for mitigation S South SE Southeast SF Square foot SW Southwest TBD To be determined W West LEGEND ABBREVIATIONS 372 SSA Project # 19033 City of Vernon - Sidewalks - ACS Report October 2020 MASTER STREET LIST 373 Access Compliance Survey Report - SidewalksCity of Vernon Master Street List Total Cost for Street: ALCOA AVE $7,134,075.38Street: AYERS AVE $1,980,089.25Street: BANDINI BLVD $11,059,109.25Street: BICKETT ST $677,168.50Street: CHAMBERS ST $222,112.50Street: CHARTER ST $882,693.00Street: CORONA AVE $1,057,397.25Street: DISTRICT BLVD $6,630,610.50Street: E 25TH ST $2,796,331.00Street: E 26TH ST $6,697,996.00Street: E 27TH ST $2,675,616.50Street: E 28TH ST $1,571,602.75Street: E 30TH ST $146,825.25Street: E 37TH ST $5,042,928.75Street: E 38TH ST $3,329,577.50Street: E 44TH ST $3,249,993.00Street: E 45TH ST $1,758,858.75Street: E 46TH ST $3,765,860.00Street: E 48TH ST $2,910,073.25Street: E 49TH ST $5,810,840.13Street: E 50TH ST $5,241,455.63Street: E 51ST ST $1,115,504.00Street: E 52ND DR $759,786.00Street: E 52ND PL $309,400.00Street: E 52ND ST $2,877,855.75Street: E 53RD ST $119,956.50Street: E 54TH ST $1,344,381.25Street: E 55TH ST $2,133,931.25Street: E 56TH ST $74,166.50Street: E 57TH ST $2,383,138.75Street: E ANDERSON ST $598,021.00Street: E SLAUSON AVE $3,058,467.00Street: E VERNON AVE $8,728,279.50Street: E WASHINGTON BLVD $2,996,297.63Street: EVERETT AVE $981,801.00Street: EVERETT CT $598,101.00Street: EXCHANGE AVE $1,277,289.88Street: FRUITLAND AVE $10,686,738.63Street: FWY 710 RAMP $54,960.00Street: GIFFORD AVE $457,820.25Street: HAMPTON ST $1,061,405.00Street: HARRIET ST $330,011.25Street: HAWTHORNE AVE $706,958.25Street: HELIOTROPE AVE $521,496.00Street: IRVING ST $350,375.25Street: LEONIS BLVD $5,621,552.63Street: LOMA VISTA AVE $1,789,049.75Street: MALABAR ST $164,317.00Street: MALBURG WY $1,150,021.00Street: MINERVA ST $224,544.00Street: PACIFIC BLVD $3,475,434.51Street: PACKERS AVE $47,610.00Street: PENNINGTON WY $1,104,717.50Street: ROSS ST $1,901,406.25Street: S 1ST ST $637,188.75Street: S 2ND ST $767,715.50Street: S ALAMEDA ST $5,982,593.63Street: S ATLANTIC BLVD $1,885,699.50Street: S BONNIE BEACH PL $484,186.50Street: October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 374 Access Compliance Survey Report - SidewalksCity of Vernon Master Street List Total Cost for Street: S BOYLE AVE $5,427,737.25Street: S DOWNEY RD $3,777,524.00Street: S INDIANA ST $776,846.25Street: S MAYWOOD AVE $1,130,957.50Street: S SANTA FE AVE $7,780,965.00Street: S SOTO ST $8,478,721.75Street: S SUNOL DR $527,738.50Street: SACO ST $614,102.25Street: SAINT CHARLES ST $470,863.75Street: SEVILLE AVE $2,144,382.75Street: SIERRA PINE AVE $755,289.00Street: STATE ST $786,144.00Street: Total Cost for City Sidewalks:$176,074,664.30 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 375 SSA Project # 19033 City of Vernon - Sidewalks - ACS Report October 2020 COST SUMMARY 376 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks Total Cost for Street:ALCOA AVE $7,134,075.38 Survey Street OrientationStart Street End Street Cost FRUITLAND AVE5232 ALCOA AVEALCOA AVE $132,151.50E TRAIN CROSSING5563 ALCOA AVEALCOA AVE $211,598.25W MALBURG WY6118 ALCOA AVE (OPP SIDE OF ST) ALCOA AVE $472,230.00W E SLAUSON AVE6140 ALCOA AVEALCOA AVE $830,610.13E 6140 ALCOA AVE6199 MALBURG WYALCOA AVE $325,356.00S / E E 46TH STE 44TH STALCOA AVE $540,532.50W TRAIN CROSSINGE 46TH STALCOA AVE $365,131.00W FRUITLAND AVEE 50TH STALCOA AVE $309,264.00W ALCOA AVEE SLAUSON AVEALCOA AVE $994,236.50W TRAIN CROSSINGE VERNON AVEALCOA AVE $121,320.00W 5563 ALCOA AVEFRUITLAND AVEALCOA AVE $917,194.00W TRAIN CROSSINGLEONIS BLVDALCOA AVE $299,354.25W E 44TH STTRAIN CROSSINGALCOA AVE $1,581,082.50W E 50TH STTRAIN CROSSING (4927 ALCOA AVE) ALCOA AVE $34,014.75W Total Cost for Street:AYERS AVE $1,980,089.25 Survey Street OrientationStart Street End Street Cost S SUNOL DR4395 AYERS AVEAYERS AVE $178,266.25N / E BANDINI BLVD4398 AYERS AVEAYERS AVE $380,600.25S 4395 AYERS AVEBANDINI BLVDAYERS AVE $690,588.25W / NTRAIN CROSSINGE 26TH STAYERS AVE $143,532.00NE 4398 AYERS AVES SUNOL DRAYERS AVE $238,204.00S E 26TH STTRAIN CROSSINGAYERS AVE $348,898.50SW Total Cost for Street:BANDINI BLVD $11,059,109.25 Survey Street OrientationStart Street End Street Cost S SOTO ST2939 BANDINI BLVDBANDINI BLVD $453,390.00N CITY BOUNDARY3308 BANDINI BLVDBANDINI BLVD $160,458.75S S INDIANA ST3768 BANDINI BLVDBANDINI BLVD $1,204,704.50S FWY 710 RAMPAYERS AVEBANDINI BLVD $745,136.50S S DOWNEY RDBANDINI BLVDBANDINI BLVD $348,659.50N S SUNOL DRBONNIE BEACH PLBANDINI BLVD $611,220.50S PENNINGTON WYCITY BOUNDARYBANDINI BLVD $627,699.00N SIERRA PINE AVEEAST SIDE OF LA RIVERBANDINI BLVD $387,772.50S S ATLANTIC BLVDFWY 710 RAMPBANDINI BLVD $303,411.00S 5276 BANDINI BLVDPENNINGTON WYBANDINI BLVD $683,125.50S PENNINGTON WYS ATLANTIC BLVDBANDINI BLVD $881,820.50S TRAIN CROSSINGS INDIANA STBANDINI BLVD $973,170.50S EAST SIDE OF LA RIVERS SOTO STBANDINI BLVD $521,550.00S AYERS AVES SUNOL DRBANDINI BLVD $845,709.00S 3768 BANDINI BLVDSIDEWALK BEGINSBANDINI BLVD $708,728.50S 3308 BANDINI BLVDSIERRA PINE AVEBANDINI BLVD $464,671.50S BONNIE BEACH PLTRAIN CROSSINGBANDINI BLVD $1,117,247.50S TRAIN CROSSINGTRAIN CROSSING BEFORE S DOWNEY RD BANDINI BLVD $20,634.00N Total Cost for Street:BICKETT ST $677,168.50 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGCITY BOUNDARYBICKETT ST $208,012.50E TRAIN CROSSINGE 54TH STBICKETT ST $118,920.00W 5715 BICKETT STTRAIN CROSSINGBICKETT ST $350,236.00W October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 377 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks Total Cost for Street:CHAMBERS ST $222,112.50 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSHAMPTON STCHAMBERS ST $81,420.00S HAMPTON STPACIFIC BLVDCHAMBERS ST $140,692.50N Total Cost for Street:CHARTER ST $882,693.00 Survey Street OrientationStart Street End Street Cost TRAIN CROSSING4200 CHARTER STCHARTER ST $250,101.00S S DOWNEY RD4295 CHARTER STCHARTER ST $321,745.50NE SIDEWALK ENDSDRIVEWAYCHARTER ST $47,817.00E ROAD BLOCKEDEXCHANGE AVECHARTER ST $59,521.50E ROAD BLOCKEDS DOWNEY RDCHARTER ST $19,615.50S S DOWNEY RDS MAYWOOD AVECHARTER ST $64,138.50N EXCHANGE AVETRAIN CROSSINGCHARTER ST $119,754.00W Total Cost for Street:CORONA AVE $1,057,397.25 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGDISTRICT BLVDCORONA AVE $70,312.50W E 49TH STE 48TH STCORONA AVE $209,070.00W E 50TH STE 49TH STCORONA AVE $204,697.50W TRAIN CROSSINGE 50TH STCORONA AVE $212,242.50W TRAIN CROSSINGFRUITLAND AVECORONA AVE $76,410.00E E 48TH STTRAIN CROSSINGCORONA AVE $284,664.75W Total Cost for Street:DISTRICT BLVD $6,630,610.50 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGCORONA AVEDISTRICT BLVD $837,284.50S / SWTRAIN CROSSINGE 49TH STDISTRICT BLVD $109,736.25SW TRAIN CROSSINGE 50TH STDISTRICT BLVD $104,832.00SW LOMA VISTA AVEEVERETT AVEDISTRICT BLVD $724,576.75S S ATLANTIC BLVDFRUITLAND AVEDISTRICT BLVD $118,957.50SW TRAIN CROSSINGGIFFORD AVEDISTRICT BLVD $83,918.25SW SIDEWALK ENDSHELIOTROPE AVEDISTRICT BLVD $22,884.00S CORONA AVELOMA VISTA AVEDISTRICT BLVD $922,494.00S SIDEWALK ENDSS ATLANTIC BLVDDISTRICT BLVD $683,723.00S SIDEWALK CONSTRUCTIONS DOWNEY RDDISTRICT BLVD $108,314.25S EVERETT AVES MAYWOOD AVEDISTRICT BLVD $584,107.50S HELIOTROPE AVESIDEWALK BEGINSDISTRICT BLVD $608,043.00S FRUITLAND AVETRAIN CROSSINGDISTRICT BLVD $579,170.25SW CORONA AVETRAIN CROSSING (4735 DISTRICT BLVD) DISTRICT BLVD $320,226.00NE / NTRAIN CROSSINGTRAIN CROSSING (4825 DISTRICT BLVD) DISTRICT BLVD $247,779.00NE TRAIN CROSSING (4825 DISTRICT BLVD) TRAIN CROSSING (4949 DISTRICT BLVD) DISTRICT BLVD $443,612.00NE TRAIN CROSSINGTRAIN CROSSING (AFTER DISTRICT BLVD) DISTRICT BLVD $130,952.25SW Total Cost for Street:E 25TH ST $2,796,331.00 Survey Street OrientationStart Street End Street Cost S SANTA FE AVE2120 E 25TH STE 25TH ST $499,070.00S TRAIN CROSSINGS ALAMEDA STE 25TH ST $284,800.50S TRAIN CROSSINGS SANTA FE AVEE 25TH ST $908,884.00N 2120 E 25TH STTRAIN CROSSINGE 25TH ST $1,103,576.50S Total Cost for Street:E 26TH ST $6,697,996.00 Survey Street OrientationStart Street End Street Cost S SOTO ST2640 E 26TH STE 26TH ST $172,395.00S October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 378 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks HARRIET ST2677 E 26TH STE 26TH ST $267,090.00N S INDIANA ST3770 E 26TH STE 26TH ST $490,702.50S AYERS AVE4366 E 26TH STE 26TH ST $335,886.75S SIDEWALK ENDSAYERS AVEE 26TH ST $420,015.00S S BONNIE BEACH PLE 26TH STE 26TH ST $389,160.00S 2640 E 26TH STHARRIET STE 26TH ST $404,767.00S TRAIN CROSSINGMINERVA STE 26TH ST $259,772.25N 4366 E 26TH STS BONNIE BEACH PLE 26TH ST $377,730.00S SIDEWALK ENDSS DOWNEY RDE 26TH ST $205,440.00SW E 26TH STS INDIANA STE 26TH ST $343,477.50S TRAIN CROSSINGS SANTA FE AVEE 26TH ST $80,259.00S TRAIN CROSSINGS SOTO STE 26TH ST $513,781.75S 3770 E 26TH STSIDEWALK BEGINSE 26TH ST $767,277.50S TRAIN CROSSINGSIERRA PINE AVEE 26TH ST $126,390.00S SIERRA PINE AVETRAIN CROSSINGE 26TH ST $717,744.00S TRAIN CROSSINGTRAIN CROSSING (3211 E 26TH ST) E 26TH ST $486,780.00S TRAIN CROSSING (3211 E 26TH ST) TRAIN CROSSING (3305 E 26TH ST) E 26TH ST $297,291.00NE S DOWNEY RDTRAIN CROSSING BEFORE S DOWNEY RD E 26TH ST $42,036.75SW Total Cost for Street:E 27TH ST $2,675,616.50 Survey Street OrientationStart Street End Street Cost S SANTA FE AVE2200 E 27TH STE 27TH ST $581,436.50S SIDEWALK ENDS2375 E 27TH STE 27TH ST $533,200.00N S SANTA FE AVE2443 E 27TH STE 27TH ST $122,284.00N TRAIN CROSSINGS SANTA FE AVEE 27TH ST $518,725.50S 2455 E 27TH STTRAIN CROSSINGE 27TH ST $919,970.50N Total Cost for Street:E 28TH ST $1,571,602.75 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSS SANTA FE AVEE 28TH ST $694,379.00S S SANTA FE AVESIDEWALK BEGINSE 28TH ST $877,223.75N Total Cost for Street:E 30TH ST $146,825.25 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSS SANTA FE AVEE 30TH ST $146,825.25S Total Cost for Street:E 37TH ST $5,042,928.75 Survey Street OrientationStart Street End Street Cost S SANTA FE AVE2350 E 37TH STE 37TH ST $85,995.00S JEWEL AVE2522 E 37TH STE 37TH ST $1,052,761.00S 2350 E 37TH STIRVING STE 37TH ST $290,403.75S 2522 E 37TH STJEWEL AVEE 37TH ST $579,797.00N S ALAMEDA STROSS STE 37TH ST $852,264.00N E 38TH STS SANTA FE AVEE 37TH ST $760,253.25S JEWEL AVES SOTO STE 37TH ST $450,060.00N ROSS STSACO STE 37TH ST $554,492.25N S SOTO STSEVILLE AVEE 37TH ST $416,902.50S Total Cost for Street:E 38TH ST $3,329,577.50 Survey Street OrientationStart Street End Street Cost S SANTA FE AVEE 37TH STE 38TH ST $198,562.50N SIDEWALK ENDSIRVING STE 38TH ST $762,223.50S IRVING STROSS STE 38TH ST $1,132,344.50S ROSS STS ALAMEDA STE 38TH ST $328,348.50S October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 379 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks 2522 E 37TH STS SANTA FE AVEE 38TH ST $753,892.50S S SANTA FE AVESIDEWALK BEGINSE 38TH ST $154,206.00S Total Cost for Street:E 44TH ST $3,249,993.00 Survey Street OrientationStart Street End Street Cost S BOYLE AVE4404 S STATE STE 44TH ST $33,231.00S S BOYLE AVEALCOA AVEE 44TH ST $816,654.75N ALCOA AVES BOYLE AVEE 44TH ST $1,020,726.25S TRAIN CROSSINGS SOTO STE 44TH ST $437,987.25S 3060 E 44TH STTRAIN CROSSINGE 44TH ST $941,393.75S Total Cost for Street:E 45TH ST $1,758,858.75 Survey Street OrientationStart Street End Street Cost SEVILLE AVEPACIFIC BLVDE 45TH ST $616,500.00S SIDEWALK ENDSS DOWNEY RDE 45TH ST $70,020.00N HAWTHORNE AVESAINT CHARLES STE 45TH ST $353,163.75N SIDEWALK ENDSSEVILLE AVEE 45TH ST $574,702.50S S DOWNEY RDSIDEWALK BEGINSE 45TH ST $144,472.50S Total Cost for Street:E 46TH ST $3,765,860.00 Survey Street OrientationStart Street End Street Cost S SOTO ST2957 E 46TH STE 46TH ST $298,957.50N ALCOA AVE3018 E 46TH STE 46TH ST $132,214.25S S BOYLE AVEALCOA AVEE 46TH ST $608,175.00N 2650 E 46TH STPACIFIC BLVDE 46TH ST $146,850.00S ALCOA AVES BOYLE AVEE 46TH ST $368,769.50S SIDEWALK ENDSS SOTO STE 46TH ST $225,926.50S SAINT CHARLES STSAINT CHARLES STE 46TH ST $493,686.50W PACIFIC BLVDSEVILLE AVEE 46TH ST $200,800.00N 3018 E 46TH STSIDEWALK BEGINSE 46TH ST $1,290,480.75S Total Cost for Street:E 48TH ST $2,910,073.25 Survey Street OrientationStart Street End Street Cost S ALAMEDA ST2025 E 48TH STE 48TH ST $224,850.75N S SANTA FE AVE2034 E 48TH STE 48TH ST $438,624.00S SIDEWALK ENDSCORONA AVEE 48TH ST $574,354.50S SIDEWALK ENDSDISTRICT BLVDE 48TH ST $195,382.50N 2025 E 48TH STEND OF SIDEWALK AT DRIVEWAY E 48TH ST $178,884.00N DISTRICT BLVDGIFFORD AVEE 48TH ST $16,051.50S CORONA AVELOMA VISTA AVEE 48TH ST $506,156.00S 2034 E 48TH STS ALAMEDA STE 48TH ST $520,008.00S SIDEWALK ENDSS SANTA FE AVEE 48TH ST $182,340.00N GIFFORD AVESIDEWALK BEGINSE 48TH ST $73,422.00S Total Cost for Street:E 49TH ST $5,810,840.13 Survey Street OrientationStart Street End Street Cost S SANTA FE AVE2100 E 49TH STE 49TH ST $471,436.00S S ALAMEDA ST2145 E 49TH STE 49TH ST $561,944.75N GIFFORD AVECORONA AVEE 49TH ST $925,832.00S GIFFORD AVEDISTRICT BLVDE 49TH ST $149,413.50N EVERETT AVEDRIVEWAYE 49TH ST $14,272.50N TRAIN CROSSINGEVERETT AVEE 49TH ST $115,276.50S TRAIN CROSSINGEVERETT CTE 49TH ST $58,305.00S SIDEWALK ENDSGIFFORD AVEE 49TH ST $300,939.00S October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 380 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks PACIFIC BLVDHAMPTON STE 49TH ST $472,601.00S CORONA AVELOMA VISTA AVEE 49TH ST $894,316.13S HAMPTON STPACIFIC BLVDE 49TH ST $264,041.25N 2100 E 49TH STS ALAMEDA STE 49TH ST $327,427.00S HAMPTON STS SANTA FE AVEE 49TH ST $872,811.25S DISTRICT BLVDSIDEWALK BEGINSE 49TH ST $100,439.50S LOMA VISTA AVETRAIN CROSSINGE 49TH ST $281,784.75S Total Cost for Street:E 50TH ST $5,241,455.63 Survey Street OrientationStart Street End Street Cost S SOTO ST2905 E 50TH STE 50TH ST $182,133.00N S BOYLE AVE3022 E 50TH STE 50TH ST $150,176.25S ALCOA AVE3228 E 50TH STE 50TH ST $89,223.75S S SOTO ST5001 S SOTO STE 50TH ST $20,760.00S S BOYLE AVEALCOA AVEE 50TH ST $440,333.25S GIFFORD AVECORONA AVEE 50TH ST $952,002.50S GIFFORD AVEDISTRICT BLVDE 50TH ST $571,845.00N DISTRICT BLVDGIFFORD AVEE 50TH ST $1,043,001.00S CORONA AVELOMA VISTA AVEE 50TH ST $591,520.00S 3228 E 50TH STS BOYLE AVEE 50TH ST $780,496.50S S BOYLE AVES SOTO STE 50TH ST $120,360.00S 3022 E 50TH STSIDEWALK BEGINSE 50TH ST $299,604.38S Total Cost for Street:E 51ST ST $1,115,504.00 Survey Street OrientationStart Street End Street Cost S ALAMEDA ST2131 E 51ST STE 51ST ST $316,575.00N 2380 E 51ST ST2140 E 51ST STE 51ST ST $220,410.00S S SANTA FE AVE2380 E 51ST STE 51ST ST $15,282.00S 2140 E 51ST STS ALAMEDA STE 51ST ST $293,822.00S 2131 E 51ST STS SANTA FE AVEE 51ST ST $269,415.00N Total Cost for Street:E 52ND DR $759,786.00 Survey Street OrientationStart Street End Street Cost 4905 E 52ND DRALAMO AVEE 52ND DR $73,530.00N KING AVEHELIOTROPE AVEE 52ND DR $470,256.00N S ATLANTIC BLVDKING AVEE 52ND DR $216,000.00N Total Cost for Street:E 52ND PL $309,400.00 Survey Street OrientationStart Street End Street Cost HELIOTROPE AVE4905 E 52ND PLE 52ND PL $309,400.00NE Total Cost for Street:E 52ND ST $2,877,855.75 Survey Street OrientationStart Street End Street Cost S ALAMEDA ST2139 E 52ND STE 52ND ST $414,153.00N S SANTA FE AVE2200 E 52ND STE 52ND ST $723,301.50S S SANTA FE AVEMALABAR STE 52ND ST $464,979.00N MALABAR STPACIFIC BLVDE 52ND ST $475,857.00N 2200 E 52ND STS ALAMEDA STE 52ND ST $405,868.50S ALLEY - ADJACENT SANTA FE BLVD S SANTA FE AVEE 52ND ST $393,696.75S Total Cost for Street:E 53RD ST $119,956.50 Survey Street OrientationStart Street End Street Cost S SANTA FE AVECITY BOUNDARYE 53RD ST $52,668.00N CITY BOUNDARYS SANTA FE AVEE 53RD ST $67,288.50S October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 381 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks Total Cost for Street:E 54TH ST $1,344,381.25 Survey Street OrientationStart Street End Street Cost S SOTO ST2825 E 54TH STE 54TH ST $159,170.00N S BOYLE AVEBICKETT STE 54TH ST $324,892.25S S SANTA FE AVECITY BOUNDARYE 54TH ST $62,928.00N E 54TH STS BOYLE AVEE 54TH ST $353,005.00N CITY BOUNDARYS SANTA FE AVEE 54TH ST $44,511.00S BICKETT STS SOTO STE 54TH ST $399,875.00S Total Cost for Street:E 55TH ST $2,133,931.25 Survey Street OrientationStart Street End Street Cost S ALAMEDA ST2051 E 55TH STE 55TH ST $345,581.50N S SANTA FE AVE2100 E 55TH STE 55TH ST $399,675.25S 2100 E 55TH STS ALAMEDA STE 55TH ST $759,780.00S ALLEY - ADJACENT SANTA FE BLVD S SANTA FE AVEE 55TH ST $628,894.50S Total Cost for Street:E 56TH ST $74,166.50 Survey Street OrientationStart Street End Street Cost S SANTA FE AVECITY BOUNDARYE 56TH ST $30,580.50N CITY BOUNDARYS SANTA FE AVEE 56TH ST $43,586.00S Total Cost for Street:E 57TH ST $2,383,138.75 Survey Street OrientationStart Street End Street Cost S 2ND ST5700 S 1ST STE 57TH ST $78,166.50S S SANTA FE AVECITY BOUNDARYE 57TH ST $42,664.50N S SANTA FE AVEE ANDERSON STE 57TH ST $656,370.00S ASPHALT DRIVEWAYS 1ST STE 57TH ST $218,139.00S E ANDERSON STS 2ND STE 57TH ST $689,187.75S S 1ST STS ALAMEDA STE 57TH ST $164,350.00S CITY BOUNDARYS SANTA FE AVEE 57TH ST $534,261.00S Total Cost for Street:E ANDERSON ST $598,021.00 Survey Street OrientationStart Street End Street Cost E 57TH ST2202 E ANDERSON STE ANDERSON ST $177,661.00E S 2ND STE 57TH STE ANDERSON ST $349,308.00W / N2198 E ANDERSON STS 2ND STE ANDERSON ST $71,052.00S Total Cost for Street:E SLAUSON AVE $3,058,467.00 Survey Street OrientationStart Street End Street Cost MALBURG WYALCOA AVEE SLAUSON AVE $974,234.50S ALCOA AVEMALBURG WYE SLAUSON AVE $730,322.00N TRAIN CROSSINGS BOYLE AVEE SLAUSON AVE $517,076.25S SIDEWALK ENDSS SANTA FE AVEE SLAUSON AVE $222,271.50S MALBURG WYTRAIN CROSSINGE SLAUSON AVE $614,562.75S Total Cost for Street:E VERNON AVE $8,728,279.50 Survey Street OrientationStart Street End Street Cost S SANTA FE AVE2503 E VERNON AVEE VERNON AVE $317,820.00N SEVILLE AVE2620 E VERNON AVEE VERNON AVE $268,620.00S S SOTO ST3163 E VERNON AVEE VERNON AVE $289,897.50N S BOYLE AVE3275 E VERNON AVEE VERNON AVE $411,901.50S S DOWNEY RDALCOA AVEE VERNON AVE $1,223,185.25S S ALAMEDA STFURLONG PLE VERNON AVE $854,244.00N SAINT CHARLES STHAWTHORNE AVEE VERNON AVE $166,099.50S October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 382 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks HAWTHORNE AVES ALAMEDA STE VERNON AVE $425,714.00S ALCOA AVES BOYLE AVEE VERNON AVE $893,360.25S ALCOA AVES DOWNEY RDE VERNON AVE $550,344.50N 2620 E VERNON AVES SANTA FE AVEE VERNON AVE $843,814.00S 3275 E VERNON AVES SOTO STE VERNON AVE $490,701.50S S SANTA FE AVESAINT CHARLES STE VERNON AVE $750,165.00S S SOTO STSEVILLE AVEE VERNON AVE $1,242,412.50S Total Cost for Street:E WASHINGTON BLVD $2,996,297.63 Survey Street OrientationStart Street End Street Cost 3888 E WASHINGTON BLVD3770 E WASHINGTON BLVDE WASHINGTON BLVD $679,008.00S SHEILA ST3888 E WASHINGTON BLVDE WASHINGTON BLVD $272,376.00S S DOWNEY RDCITY BOUNDARYE WASHINGTON BLVD $346,777.50SW CITY BOUNDARYS DOWNEY RDE WASHINGTON BLVD $201,376.13NE 3770 E WASHINGTON BLVDSIDEWALK BEGINSE WASHINGTON BLVD $1,496,760.00S Total Cost for Street:EVERETT AVE $981,801.00 Survey Street OrientationStart Street End Street Cost E 49TH ST4803 EVERETT AVEEVERETT AVE $38,299.50W TRAIN CROSSINGDISTRICT BLVDEVERETT AVE $311,962.50W FRUITLAND AVEE 49TH STEVERETT AVE $252,001.50W DISTRICT BLVDEXCHANGE AVEEVERETT AVE $209,137.50W E 49TH STSIDEWALK BEGINSEVERETT AVE $170,400.00W Total Cost for Street:EVERETT CT $598,101.00 Survey Street OrientationStart Street End Street Cost FRUITLAND AVEE 49TH STEVERETT CT $322,431.00W E 49TH STFRUITLAND AVEEVERETT CT $275,670.00E Total Cost for Street:EXCHANGE AVE $1,277,289.88 Survey Street OrientationStart Street End Street Cost CHARTER ST4353 EXCHANGE AVEEXCHANGE AVE $96,517.50N S DOWNEY RDCHARTER STEXCHANGE AVE $295,996.50N 4353 EXCHANGE AVELOMA VISTA AVEEXCHANGE AVE $163,393.38N S MAYWOOD AVES DOWNEY RDEXCHANGE AVE $599,744.50S SIDEWALK ENDSS MAYWOOD AVEEXCHANGE AVE $121,638.00S Total Cost for Street:FRUITLAND AVE $10,686,738.63 Survey Street OrientationStart Street End Street Cost S SOTO ST2901 FRUITLAND AVEFRUITLAND AVE $469,614.00N S BOYLE AVE2929 FRUITLAND AVEFRUITLAND AVE $651,870.00S GIFFORD AVE4901 FRUITLAND AVEFRUITLAND AVE $213,290.50N S DOWNEY RDALCOA AVEFRUITLAND AVE $1,405,673.25S CORONA AVECARMELITA AVEFRUITLAND AVE $49,096.00S LOMA VISTA AVECORONA AVEFRUITLAND AVE $367,942.50N 4901 FRUITLAND AVEDISTRICT BLVDFRUITLAND AVE $227,672.50N S MAYWOOD AVEEVERETT AVEFRUITLAND AVE $197,190.00N LOMA VISTA AVEEVERETT CTFRUITLAND AVE $200,547.00S CORONA AVEGIFFORD AVEFRUITLAND AVE $251,397.00N S SANTA FE AVEHAMPTON STFRUITLAND AVE $619,347.63N CARMELITA AVELOMA VISTA AVEFRUITLAND AVE $267,363.00S PACIFIC BLVDMALABAR STFRUITLAND AVE $484,394.75S EVERETT CTMAYWOOD AVEFRUITLAND AVE $200,839.50S S SOTO STPACIFIC BLVDFRUITLAND AVE $1,007,261.75S October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 383 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks ALCOA AVES BOYLE AVEFRUITLAND AVE $1,359,393.25S MAYWOOD AVES DOWNEY RDFRUITLAND AVE $785,898.00S S DOWNEY RDS MAYWOOD AVEFRUITLAND AVE $169,736.50N MALABAR STS SANTA FE AVEFRUITLAND AVE $351,500.00S 2929 FRUITLAND AVES SOTO STFRUITLAND AVE $1,103,231.50S PACIFIC BLVDSEVILLE AVEFRUITLAND AVE $303,480.00N Total Cost for Street:FWY 710 RAMP $54,960.00 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSSIDEWALK BEGINSFWY 710 RAMP $54,960.00W Total Cost for Street:GIFFORD AVE $457,820.25 Survey Street OrientationStart Street End Street Cost E 49TH STDRIVEWAYGIFFORD AVE $50,940.00E TRAIN CROSSINGE 48TH STGIFFORD AVE $24,462.00W TRAIN CROSSINGE 49TH STGIFFORD AVE $69,680.25W TRAIN CROSSINGE 50TH STGIFFORD AVE $96,690.00W TRAIN CROSSINGFRUITLAND AVEGIFFORD AVE $84,735.00E E 48TH STSIDEWALK BEGINSGIFFORD AVE $17,779.50E E 49TH STTRAIN CROSSINGGIFFORD AVE $113,533.50W Total Cost for Street:HAMPTON ST $1,061,405.00 Survey Street OrientationStart Street End Street Cost E 49TH ST5034 HAMPTON STHAMPTON ST $188,275.00E E 49TH STCHAMBERS STHAMPTON ST $232,780.00W FRUITLAND AVEE 49TH STHAMPTON ST $640,350.00W Total Cost for Street:HARRIET ST $330,011.25 Survey Street OrientationStart Street End Street Cost E 26TH STE 25TH STHARRIET ST $178,368.00W E 25TH STE 26TH STHARRIET ST $151,643.25E Total Cost for Street:HAWTHORNE AVE $706,958.25 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSE 45TH STHAWTHORNE AVE $38,321.25E E 45TH STE VERNON AVEHAWTHORNE AVE $632,187.00S E VERNON AVESIDEWALK BEGINSHAWTHORNE AVE $36,450.00E Total Cost for Street:HELIOTROPE AVE $521,496.00 Survey Street OrientationStart Street End Street Cost TRAIN CROSSING52ND PLHELIOTROPE AVE $319,440.00E RAILROAD CROSSINGDISTRICT BLVDHELIOTROPE AVE $106,464.00W E 52ND DRRAILROAD TRACKSHELIOTROPE AVE $69,120.00W DISTRICT BLVDTRAIN CROSSINGHELIOTROPE AVE $26,472.00SE Total Cost for Street:IRVING ST $350,375.25 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGE 37TH STIRVING ST $49,599.00W E 38TH STE 38TH STIRVING ST $223,785.75S E 38TH STTRAIN CROSSINGIRVING ST $76,990.50W Total Cost for Street:LEONIS BLVD $5,621,552.63 Survey Street OrientationStart Street End Street Cost S BOYLE AVE2906 LEONIS BLVDLEONIS BLVD $336,950.00S S SOTO ST2909 LEONIS BLVDLEONIS BLVD $512,394.00N S DOWNEY RDALCOA AVELEONIS BLVD $1,349,646.13S October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 384 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks SEVILLE AVEPACIFIC BLVDLEONIS BLVD $275,448.00S ALCOA AVES BOYLE AVELEONIS BLVD $1,092,397.50S ALCOA AVES DOWNEY RDLEONIS BLVD $684,060.00N 2906 LEONIS BLVDS SOTO STLEONIS BLVD $726,202.75S S SOTO STSEVILLE AVELEONIS BLVD $644,454.25S Total Cost for Street:LOMA VISTA AVE $1,789,049.75 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGDISTRICT BLVDLOMA VISTA AVE $408,373.25W DISTRICT BLVDE 48TH STLOMA VISTA AVE $96,840.00E FRUITLAND AVEE 49TH STLOMA VISTA AVE $451,715.00W E 49TH STE 50TH STLOMA VISTA AVE $125,334.00E DISTRICT BLVDEXCHANGE AVELOMA VISTA AVE $375,250.00W E 50TH STFRUITLAND AVELOMA VISTA AVE $111,862.50E E 49TH STTRAIN CROSSINGLOMA VISTA AVE $219,675.00W Total Cost for Street:MALABAR ST $164,317.00 Survey Street OrientationStart Street End Street Cost FRUITLAND AVEE 52ND STMALABAR ST $79,365.00E E 52ND STFRUITLAND AVEMALABAR ST $84,952.00W Total Cost for Street:MALBURG WY $1,150,021.00 Survey Street OrientationStart Street End Street Cost 6199 MALBURG WY6065 MALBURG WYMALBURG WY $196,008.00W E SLAUSON AVE6074 MALBURG WYMALBURG WY $304,513.00E 6074 MALBURG WYALCOA AVEMALBURG WY $250,776.00E 6065 MALBURG WYE SLAUSON AVEMALBURG WY $398,724.00W Total Cost for Street:MINERVA ST $224,544.00 Survey Street OrientationStart Street End Street Cost E 26TH STE 25TH STMINERVA ST $76,209.00W E 25TH STE 26TH STMINERVA ST $148,335.00E Total Cost for Street:PACIFIC BLVD $3,475,434.51 Survey Street OrientationStart Street End Street Cost E 49TH STCHAMBERS STPACIFIC BLVD $364,144.75W FRUITLAND AVECITY BOUNDARYPACIFIC BLVD $55,278.00E CHAMBERS STE 45TH STPACIFIC BLVD $853,738.01W E 45TH STE 46TH STPACIFIC BLVD $256,077.00E FRUITLAND AVEE 49TH STPACIFIC BLVD $403,059.50W E 52ND STFRUITLAND AVEPACIFIC BLVD $798,876.25W E 46TH STLEONIS BLVDPACIFIC BLVD $175,861.00E E 45TH STS SANTA FE AVEPACIFIC BLVD $568,400.00S Total Cost for Street:PACKERS AVE $47,610.00 Survey Street OrientationStart Street End Street Cost S DOWNEY RDSIDEWALK BEGINSPACKERS AVE $47,610.00S Total Cost for Street:PENNINGTON WY $1,104,717.50 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSBANDINI BLVDPENNINGTON WY $373,302.50NE BANDINI BLVDSIDEWALK BEGINSPENNINGTON WY $731,415.00S / W Total Cost for Street:ROSS ST $1,901,406.25 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGE 37TH STROSS ST $419,332.00W October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 385 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks SIDEWALK ENDSE 38TH STROSS ST $438,399.00W E 37TH STS ALAMEDA STROSS ST $581,273.25S / WE 38TH STSIDEWALK BEGINSROSS ST $318,285.00E E 38TH STTRAIN CROSSINGROSS ST $144,117.00W Total Cost for Street:S 1ST ST $637,188.75 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSE 57TH STS 1ST ST $294,648.00W E 57TH STSIDEWALK BEGINSS 1ST ST $342,540.75E Total Cost for Street:S 2ND ST $767,715.50 Survey Street OrientationStart Street End Street Cost E SLAUSON AVEE 57TH STS 2ND ST $413,811.50W E 57TH STE ANDERSON STS 2ND ST $233,064.00E E ANDERSON STE SLAUSON AVES 2ND ST $120,840.00E Total Cost for Street:S ALAMEDA ST $5,982,593.63 Survey Street OrientationStart Street End Street Cost E 25TH STE 27TH STS ALAMEDA ST $369,944.50E ROSS STE 37TH STS ALAMEDA ST $691,560.25S E 37TH STE 38TH STS ALAMEDA ST $100,439.63E E VERNON AVEE 48TH STS ALAMEDA ST $882,765.00E E 48TH STE 49TH STS ALAMEDA ST $535,080.75E E 49TH STE 51ST STS ALAMEDA ST $427,110.00E E 51ST STE 52ND STS ALAMEDA ST $326,155.00E E 52ND STE 55TH STS ALAMEDA ST $504,300.00E E 55TH STE 57TH STS ALAMEDA ST $307,192.50E E 57TH STE SLAUSON AVES ALAMEDA ST $472,592.25W E 38TH STE VERNON AVES ALAMEDA ST $851,559.75E E 27TH STROSS STS ALAMEDA ST $513,894.00E Total Cost for Street:S ATLANTIC BLVD $1,885,699.50 Survey Street OrientationStart Street End Street Cost S ATLANTIC BLVD (NEXT TO OVERPASS) BANDINI BLVDS ATLANTIC BLVD $215,430.00E BANDINI BLVDCITY BOUNDARYS ATLANTIC BLVD $270,840.00W E 52ND DRDISTRICT BLVDS ATLANTIC BLVD $378,492.00SW DISTRICT BLVDE 52ND DRS ATLANTIC BLVD $113,016.00SE CITY BOUNDARYS ATLANTIC BLVDS ATLANTIC BLVD $100,105.50E DISTRICT BLVDSIDEWALK BEGINSS ATLANTIC BLVD $807,816.00W Total Cost for Street:S BONNIE BEACH PL $484,186.50 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGBANDINI BLVDS BONNIE BEACH PL $120,441.00SE TRAIN CROSSINGE 26TH STS BONNIE BEACH PL $143,184.00NW E 26TH STTRAIN CROSSINGS BONNIE BEACH PL $220,561.50SE Total Cost for Street:S BOYLE AVE $5,427,737.25 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGE 44TH STS BOYLE AVE $122,098.25W TRAIN CROSSINGE 46TH STS BOYLE AVE $79,062.75E FRUITLAND AVEE 50TH STS BOYLE AVE $468,579.00W TRAIN CROSSINGE 54TH STS BOYLE AVE $104,230.25W TRAIN CROSSINGE SLAUSON AVES BOYLE AVE $903,888.50E TRAIN CROSSINGE VERNON AVES BOYLE AVE $102,918.75E SIDEWALK CLOSEDFRUITLAND AVES BOYLE AVE $525,037.00W October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 386 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks TRAIN CROSSINGLEONIS BLVDS BOYLE AVE $118,990.50W 6170 STATE STRANDOLPH STS BOYLE AVE $868,900.75E E 54TH STSIDEWALK BEGINSS BOYLE AVE $161,045.50W E 46TH STTRAIN CROSSINGS BOYLE AVE $1,585,551.00W FRUITLAND AVETRAIN CROSSING (5370 S BOYLE AVE) S BOYLE AVE $387,435.00E Total Cost for Street:S DOWNEY RD $3,777,524.00 Survey Street OrientationStart Street End Street Cost TRAIN CROSSING5401 S DOWNEY RDS DOWNEY RD $544,986.50W E WASHINGTON BLVDCITY BOUNDARYS DOWNEY RD $190,642.50W PACKERS AVEE 45TH STS DOWNEY RD $42,788.00W FRUITLAND AVEE 50TH STS DOWNEY RD $321,033.50W E 45TH STE VERNON AVES DOWNEY RD $251,170.50W 5401 S DOWNEY RDFRUITLAND AVES DOWNEY RD $898,491.00W E 50TH STLEONIS BLVDS DOWNEY RD $408,915.00W LEONIS BLVDPACKERS AVES DOWNEY RD $368,927.50W BANDINI BLVDSIDEWALK BEGINSS DOWNEY RD $457,385.50SW E SLAUSON AVETRAIN CROSSINGS DOWNEY RD $293,184.00W Total Cost for Street:S INDIANA ST $776,846.25 Survey Street OrientationStart Street End Street Cost TRAIN CROSSINGBANDINI BLVDS INDIANA ST $135,135.00SW TRAIN CROSSINGE 26TH STS INDIANA ST $253,507.50NW E 26TH STTRAIN CROSSINGS INDIANA ST $388,203.75SW Total Cost for Street:S MAYWOOD AVE $1,130,957.50 Survey Street OrientationStart Street End Street Cost CONSTRUCTIONCHARTER STS MAYWOOD AVE $16,254.00NE TRAIN CROSSINGCONSTRUCTIONS MAYWOOD AVE $42,511.50NE TRAIN CROSSINGDISTRICT BLVDS MAYWOOD AVE $129,361.50E TRAIN CROSSINGEXCHANGE AVES MAYWOOD AVE $253,298.50W FRUITLAND AVESIDEWALK BEGINSS MAYWOOD AVE $325,444.50W DISTRICT BLVDTRAIN CROSSINGS MAYWOOD AVE $364,087.50W Total Cost for Street:S SANTA FE AVE $7,780,965.00 Survey Street OrientationStart Street End Street Cost PACIFIC BLVD4600 S SANTA FE AVES SANTA FE AVE $237,690.00E E 57TH STCITY BOUNDARYS SANTA FE AVE $70,434.00W E 25TH STE 25TH STS SANTA FE AVE $245,040.50W E 25TH STE 26TH STS SANTA FE AVE $143,858.75E E 37TH STE 27TH STS SANTA FE AVE $785,272.50W E 27TH STE 28TH STS SANTA FE AVE $156,205.00E E 28TH STE 30TH STS SANTA FE AVE $295,990.75E E 38TH STE 37TH STS SANTA FE AVE $282,689.25W E VERNON AVEE 38TH STS SANTA FE AVE $850,546.75W E 49TH STE 48TH STS SANTA FE AVE $413,905.50W E 51ST STE 49TH STS SANTA FE AVE $647,320.50W E 52ND STE 51ST STS SANTA FE AVE $218,538.00W E 55TH STE 52ND STS SANTA FE AVE $370,928.25W E 52ND STE 53RD STS SANTA FE AVE $86,782.50E E 53RD STE 54TH STS SANTA FE AVE $150,081.00E E 56TH STE 55TH STS SANTA FE AVE $473,356.50W E 55TH STE 56TH STS SANTA FE AVE $196,209.00E October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 387 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks TRAIN CROSSINGE 57TH STS SANTA FE AVE $374,904.25W E 48TH STE VERNON AVES SANTA FE AVE $952,080.25W E 49TH STFRUITLAND AVES SANTA FE AVE $671,872.50E E VERNON AVEPACIFIC BLVDS SANTA FE AVE $157,259.25E Total Cost for Street:S SOTO ST $8,478,721.75 Survey Street OrientationStart Street End Street Cost E 26TH ST2800 S SOTO STS SOTO ST $256,340.00E E VERNON AVE3855 S SOTO STS SOTO ST $176,175.50W E 26TH STCITY BOUNDARYS SOTO ST $203,670.00W E 37TH STE 26TH STS SOTO ST $1,399,346.00W 3851 S SOTO STE 37TH STS SOTO ST $618,598.00W E VERNON AVEE 44TH STS SOTO ST $359,835.00E LEONIS BLVDE 46TH STS SOTO ST $754,083.75W FRUITLAND AVEE 50TH STS SOTO ST $831,358.00W SEARS STE 54TH STS SOTO ST $1,339,291.75W E 46TH STE VERNON AVES SOTO ST $973,178.00W E 54TH STFRUITLAND AVES SOTO ST $607,964.25W E 50TH STLEONIS BLVDS SOTO ST $721,924.00W E 54TH STSEARS STS SOTO ST $236,957.50E Total Cost for Street:S SUNOL DR $527,738.50 Survey Street OrientationStart Street End Street Cost BANDINI BLVDAYERS AVES SUNOL DR $134,495.50E AYERS AVEBANDINI BLVDS SUNOL DR $393,243.00W Total Cost for Street:SACO ST $614,102.25 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSE 37TH STSACO ST $381,842.50E E 37TH STSIDEWALK BEGINSSACO ST $232,259.75W Total Cost for Street:SAINT CHARLES ST $470,863.75 Survey Street OrientationStart Street End Street Cost SIDEWALK ENDSE 45TH STSAINT CHARLES ST $13,140.00W E VERNON AVEE 46TH STSAINT CHARLES ST $361,042.50E E 45TH STE VERNON AVESAINT CHARLES ST $96,681.25W Total Cost for Street:SEVILLE AVE $2,144,382.75 Survey Street OrientationStart Street End Street Cost E VERNON AVEE 37TH STSEVILLE AVE $639,525.00W E 46TH STE 45TH STSEVILLE AVE $644,332.50W SIDEWALK ENDSE 46TH STSEVILLE AVE $252,612.75W E 45TH STE VERNON AVESEVILLE AVE $222,225.00W SIDEWALK ENDSFRUITLAND AVESEVILLE AVE $213,390.00E E 46TH STLEONIS BLVDSEVILLE AVE $154,117.50E LEONIS BLVDSIDEWALK BEGINSSEVILLE AVE $18,180.00E Total Cost for Street:SIERRA PINE AVE $755,289.00 Survey Street OrientationStart Street End Street Cost E 26TH STBANDINI BLVDSIERRA PINE AVE $392,814.00E BANDINI BLVDE 26TH STSIERRA PINE AVE $362,475.00W Total Cost for Street:STATE ST $786,144.00 Survey Street OrientationStart Street End Street Cost E SLAUSON AVE6170 STATE STSTATE ST $775,614.00E October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 388 City of Vernon Cost SummaryAccess Compliance Survey Report - Sidewalks RANDOLPH ST (ISLAND END)RANDOLPH ST (ISLAND START) STATE ST $10,530.00W Total Cost for City Sidewalks:$176,074,664.30 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 389 SSA Project # 19033 City of Vernon - Sidewalks - ACS Report October 2020 SURVEY DATA 390 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 5232 ALCOA AVE Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912121553 Run ID Alcoa Ave 88.75 ID Sidewalk Width Priority feet8.9 Driveway29.3to164955 feet -.2927.4 Vertical Change REF528.4to134882 5 ft feet36.3 Driveway61.4to164956 feet70.4 Continuous Width SF571.4to $120 $5401674495ft feet79.9 Driveway101.7to164957 feet .3280.5 Vertical Change REF581.5to134883 5 ft feet .34101.1 Vertical Change REF5102.1to134884 5 ft feet 2.0-3.0102.8 Cross Slope (PAR)SF56115.3to $120 $6,7501457005ft feet 4.0-5.0115.3 Cross Slope (PAR)SF36123.2to $120 $4,2661457015ft feet 2.0-3.0123.2 Cross Slope (PAR)SF99145.3to $120 $11,9341457025ft feet137.8 Continuous Width SF5138.8to $120 $5401674505ft feet -.35143.6 Vertical Change REF5144.6to134885 5 ft feet -.27146.8 Vertical Change LF5147.8to $75 $3381348865ft feet 2.0-3.0157.6 Cross Slope (PAR)SF36165.7to $120 $4,3741457035ft feet 4.0-5.0166.2 Cross Slope (PAR)SF85185.0to $120 $10,1521457045ft feet170.9 Continuous Width REF5171.9to166864 5 ft feet .32173.4 Vertical Change REF5174.4to134887 5 ft feet 6.0-7.0186.2 Cross Slope (PAR)SF12188.8to $120 $1,4041457055ft feet 5.0-6.0189.7 Cross Slope (PAR)SF36197.7to $120 $4,3201457065ft feet .28197.1 Vertical Change REF5198.1to134888 5 ft feet 3.0-4.0197.7 Cross Slope (PAR)SF40206.5to $120 $4,7521457075ft feet -.27205.6 Vertical Change REF12208.3to134889 5 ft feet 5.0-6.0206.5 Cross Slope (PAR)SF56219.0to $120 $6,7501457085ft feet 6.0-7.0220.1 Cross Slope (PAR)SF8221.8to $120 $9181457095ft feet 5.0-6.0222.2 Cross Slope (PAR)SF7223.8to $120 $8641457105ft feet 4.0-5.0226.7 Cross Slope (PAR)SF38235.1to $120 $4,5361457115ft feet -.28228.1 Vertical Change REF5229.1to134890 5 ft feet 2.0-3.0235.4 Cross Slope (PAR)SF28241.7to $120 $3,4021457125ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 391 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 5232 ALCOA AVE Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912121553 Run ID Alcoa Ave 88.75 ID Sidewalk Width Priority feet238.6 Continuous Width SF5239.6to $120 $5401674515ft feet 4.0-5.0241.7 Cross Slope (PAR)SF41250.7to $120 $4,8601457135ft feet 2.0-3.0261.8 Cross Slope (PAR)SF6263.2to $120 $7561457145ft feet 4.0-5.0263.7 Cross Slope (PAR)SF50274.9to $120 $6,0481457155ft feet .29273.3 Vertical Change REF5274.3to134891 5 ft feet 2.0-3.0278.1 Cross Slope (PAR)SF9280.1to $120 $1,0801457165ft feet 3.0-4.0283.4 Cross Slope (PAR)SF29289.9to $120 $3,5101457175ft feet -.48284.3 Vertical Change REF5285.3to134892 5 ft feet289.7 Continuous Width SF5290.7to $120 $5401674525ft feet 2.0-3.0289.9 Cross Slope (PAR)SF122317.1to $120 $14,6881457185ft feet -.29295.0 Vertical Change REF5296.0to134893 5 ft feet -.33316.5 Vertical Change REF5317.5to134894 5 ft feet318.3 Driveway338.2to164958 feet -.44338.0 Vertical Change REF5339.0to134895 5 ft feet 4.0-5.0338.8 Cross Slope (PAR)SF72354.8to $120 $8,6401457195ft feet -.26346.8 Vertical Change REF5347.8to134896 5 ft feet 2.0-3.0355.3 Cross Slope (PAR)SF6356.7to $120 $7561457205ft feet366.4 Continuous Width SF5367.4to $120 $5401675005ft feet 2.0-3.0372.9 Cross Slope (PAR)SF19377.1to $120 $2,2681457215ft feet383.5 Continuous Width SF5384.5to $120 $5401669245ft feet 2.0-3.0398.5 Cross Slope (PAR)SF27404.4to $120 $3,1861457225ft feet .26400.8 Vertical Change REF5401.8to134897 5 ft feet 4.0-5.0404.6 Cross Slope (PAR)SF23409.8to $120 $2,8081457235ft feet 3.0-4.0413.3 Cross Slope (PAR)SF10415.6to $120 $1,2421457245ft feet 6.0-7.0419.1 Cross Slope (PAR)SF28425.4to $120 $3,4021457255ft feet421.0 Continuous Width REF5422.0to167002 5 ft feet425.3 Continuous Width SF5426.3to $120 $5401674535ft feet 5.0-6.0426.4 Cross Slope (PAR)SF5427.4to $120 $5401457265ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 392 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 5232 ALCOA AVE Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912121553 Run ID Alcoa Ave 88.75 ID Sidewalk Width Priority feet 3.0-4.0427.9 Cross Slope (PAR)SF5429.0to $120 $5941457275ft feet -.68430.7 Vertical Change SF5431.7to $75 $3381348985ft feet .44432.6 Vertical Change LF5433.6to $75 $3381348995ft feet 6.0-7.0433.9 Running Slope SF5434.9to $120 $5401664525ft feet 5.0-6.0434.9 Running Slope SF5436.0to $120 $5941664535ft feet 3.0-4.0437.3 Cross Slope (PAR)SF5438.3to $120 $5401457285ft feet .32451.2 Vertical Change LF5452.2to $75 $3381349005ft feet 3.0-4.0471.8 Cross Slope (PAR)SF5472.8to $120 $5401457295ft feet 2.0-3.0472.8 Cross Slope (PAR)SF7474.3to $120 $8101457305ft feet 2.0-3.0476.8 Cross Slope (PAR)SF22481.7to $120 $2,6461457315ft feet 8.0-9.0489.2 Running Slope SF10491.4to $120 $1,1881664545ft feet .53493.9 Vertical Change SF5494.9to $75 $3381349015ft feet 2.0-3.0495.1 Cross Slope (PAR)SF9497.0to $120 $1,0261457325ft $132,151.50TOTAL COST FOR:ALCOA AVEEside of Starting at:5232 ALCOA AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 393 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side 5563 ALCOA AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912121609 Run ID Alcoa Ave 45.5 ID Sidewalk Width Priority feet 3.0-4.01.3 Cross Slope (PAR)SF112.7to $120 $1,3021456278ft feet 2.0-3.02.7 Cross Slope (PAR)SF24934.8to $120 $29,8531456288ft feet 2.0-3.037.9 Cross Slope (PAR)SF1139.3to $120 $1,3021456298ft feet 2.0-3.043.3 Cross Slope (PAR)SF17866.3to $120 $21,3901456308ft feet -.2652.4 Vertical Change REF853.4to134836 8 ft feet 2.0-3.070.5 Cross Slope (PAR)SF2073.1to $120 $2,4181456318ft feet 2.0-3.075.4 Cross Slope (PAR)SF1577.3to $120 $1,7671456328ft feet 4.0-5.077.8 Cross Slope (PAR)SF3982.8to $120 $4,6501456338ft feet 2.0-3.082.8 Cross Slope (PAR)SF153102.6to $120 $18,4141456348ft feet 4.0-5.0103.3 Cross Slope (PAR)SF74112.8to $120 $8,8351456358ft feet -.26113.2 Vertical Change LF8114.2to $75 $5811348378ft feet 4.0-5.0115.8 Cross Slope (PAR)SF612194.8to $120 $73,4701456368ft feet -.27181.1 Vertical Change REF8182.1to134838 8 ft feet 2.0-3.0194.8 Cross Slope (PAR)SF40199.9to $120 $4,7431456378ft feet 4.0-5.0200.3 Cross Slope (PAR)SF26203.6to $120 $3,0691456388ft feet .27201.8 Vertical Change REF8202.8to134839 8 ft feet 6.0-7.0207.6 Cross Slope (PAR)SF16209.6to $120 $1,8601456398ft feet 5.0-6.0209.6 Cross Slope (PAR)SF27213.1to $120 $3,2551456408ft feet 6.0-7.0213.3 Cross Slope (PAR)SF11214.7to $120 $1,3021456418ft feet 4.0-5.0219.3 Cross Slope (PAR)SF175241.9to $120 $21,0181456428ft feet -.32229.4 Vertical Change REF8230.4to134840 8 ft feet 2.0-3.0241.9 Cross Slope (PAR)SF32246.0to $120 $3,8131456438ft feet 4.0-5.0246.8 Cross Slope (PAR)SF43252.3to $120 $5,1151456448ft feet 2.0-3.0252.3 Cross Slope (PAR)SF29256.0to $120 $3,4411456458ft feet256.1 Driveway293.8to164948 $211,598.25TOTAL COST FOR:ALCOA AVEWside of Starting at:5563 ALCOA AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 394 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side 6118 ALCOA AVE (OPP SIDE OF ST) Survey Street Name Starting Street Name MALBURG WY End Street Name 1912121316 Run ID Alcoa Ave 106.5 ID Sidewalk Width Priority feet 11.0-12.04.7 Cross Slope (PAR)SF247.9to $120 $2,8801460898ft feet 9.0-10.08.9 Cross Slope (PAR)SF3213.2to $120 $3,8701460908ft feet 2.2613.3 Vertical Change REF814.3to135217 8 ft feet 11.0-12.014.2 Cross Slope (PAR)SF2317.3to $120 $2,7901460918ft feet 4.0-5.020.9 Cross Slope (PAR)SF1122.3to $120 $1,2601460928ft feet 3.0-4.024.6 Cross Slope (PAR)SF4630.7to $120 $5,4901460938ft feet 2.0-3.030.9 Cross Slope (PAR)SF19857.3to $120 $23,7601460948ft feet .3436.2 Vertical Change REF837.2to135218 8 ft feet 4.0-5.057.3 Cross Slope (PAR)SF2660.8to $120 $3,1501460958ft feet 2.0-3.060.8 Cross Slope (PAR)SF7971.3to $120 $9,4501460968ft feet72.7 Driveway99.0to164991 feet 2.0-3.0104.5 Cross Slope (PAR)SF40109.8to $120 $4,7701460978ft feet 4.0-5.0111.0 Cross Slope (PAR)SF49117.5to $120 $5,8501460988ft feet 3.0-4.0119.7 Cross Slope (PAR)SF77129.9to $120 $9,1801460998ft feet130.3 Driveway155.2to164992 feet .3130.4 Vertical Change REF8131.4to135219 8 ft feet 2.0-3.0155.8 Cross Slope (PAR)SF82166.8to $120 $9,9001461008ft feet 4.0-5.0167.8 Cross Slope (PAR)SF68176.8to $120 $8,1001461018ft feet 2.0-3.0176.8 Cross Slope (PAR)SF59184.7to $120 $7,1101461028ft feet 4.0-5.0184.9 Cross Slope (PAR)SF35189.5to $120 $4,1401461038ft feet 3.0-4.0192.3 Cross Slope (PAR)SF16194.4to $120 $1,8901461048ft feet 2.0-3.0198.5 Cross Slope (PAR)SF14200.3to $120 $1,6201461058ft feet 2.0-3.0202.4 Cross Slope (PAR)SF29206.2to $120 $3,4201461068ft feet 3.0-4.0208.8 Cross Slope (PAR)SF11210.2to $120 $1,2601461078ft feet 4.0-5.0212.9 Cross Slope (PAR)SF187237.8to $120 $22,4101461088ft feet -.27226.1 Vertical Change REF8227.1to135220 8 ft feet -.27229.7 Vertical Change REF8230.7to135221 8 ft feet 2.0-3.0237.8 Cross Slope (PAR)SF246270.6to $120 $29,5201461098ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 395 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side 6118 ALCOA AVE (OPP SIDE OF ST) Survey Street Name Starting Street Name MALBURG WY End Street Name 1912121316 Run ID Alcoa Ave 106.5 ID Sidewalk Width Priority feet .32244.4 Vertical Change REF8245.4to135222 8 ft feet 2.0-3.0273.0 Cross Slope (PAR)SF126289.8to $120 $15,1201461108ft feet -.28277.8 Vertical Change REF8278.8to135223 8 ft feet 4.0-5.0289.8 Cross Slope (PAR)SF64298.3to $120 $7,6501461118ft feet 2.0-3.0298.3 Cross Slope (PAR)SF105312.3to $120 $12,6001461128ft feet 2.0-3.0315.8 Cross Slope (PAR)SF146335.2to $120 $17,4601461138ft feet 4.0-5.0335.2 Cross Slope (PAR)SF8336.2to $120 $9001461148ft feet 4.0-5.0338.3 Cross Slope (PAR)SF20340.9to $120 $2,3401461158ft feet 5.0-6.0344.2 Cross Slope (PAR)SF31348.3to $120 $3,6901461168ft feet 3.0-4.0348.3 Cross Slope (PAR)SF10349.6to $120 $1,1701461178ft feet 2.0-3.0349.8 Cross Slope (PAR)SF131367.3to $120 $15,7501461188ft feet .31359.4 Vertical Change REF8360.4to135224 8 ft feet 4.0-5.0367.3 Cross Slope (PAR)SF113382.3to $120 $13,5001461198ft feet 2.0-3.0382.3 Cross Slope (PAR)SF94394.8to $120 $11,2501461208ft feet 4.0-5.0396.1 Cross Slope (PAR)SF183420.5to $120 $21,9601461218ft feet 2.0-3.0420.5 Cross Slope (PAR)SF119436.4to $120 $14,3101461228ft feet .54422.5 Vertical Change REF8423.5to135225 8 ft feet 4.0-5.0437.1 Cross Slope (PAR)SF24440.3to $120 $2,8801461238ft feet 2.0-3.0440.3 Cross Slope (PAR)SF302480.6to $120 $36,2701461248ft feet 4.0-5.0480.8 Cross Slope (PAR)SF320523.5to $120 $38,4301461258ft feet 2.0-3.0523.5 Cross Slope (PAR)SF10524.8to $120 $1,1701461268ft feet525.0 Driveway540.4to164993 feet 4.0-5.0541.8 Cross Slope (PAR)SF178565.5to $120 $21,3301461278ft feet .33564.0 Vertical Change REF8565.0to135226 8 ft feet 3.0-4.0567.7 Cross Slope (PAR)SF13569.4to $120 $1,5301461288ft feet 2.0-3.0569.4 Cross Slope (PAR)SF17571.6to $120 $1,9801461298ft feet572.6 Continuous Width SF8573.6to $120 $9001676158ft feet573.7 Driveway611.7to164994 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 396 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side 6118 ALCOA AVE (OPP SIDE OF ST) Survey Street Name Starting Street Name MALBURG WY End Street Name 1912121316 Run ID Alcoa Ave 106.5 ID Sidewalk Width Priority feet -.28583.0 Vertical Change REF8584.0to135227 8 ft feet 4.0-5.0611.7 Cross Slope (Driveway)SF234642.9to $40 $9,3601461308ft feet620.4 Continuous Width SF8621.4to $120 $9001667998ft feet 2.84624.1 Vertical Change REF8625.1to135228 8 ft feet .58628.1 Vertical Change REF8629.1to135229 8 ft feet 2.0-3.0642.9 Cross Slope (PAR)SF64651.4to $120 $7,6501461318ft feet648.8 Continuous Width SF8649.8to $120 $9001664088ft feet 2.0-3.0655.3 Cross Slope (PAR)SF178679.0to $120 $21,3301461328ft feet 4.0-5.0680.9 Cross Slope (PAR)SF184705.4to $120 $22,0501461338ft feet 2.94682.6 Vertical Change REF8683.6to135231 8 ft feet689.7 Continuous Width SF8690.7to $120 $9001670298ft feet -.26698.5 Vertical Change REF8699.5to135232 8 ft feet 6.0-7.0710.5 Cross Slope (PAR)SF9711.7to $120 $1,0801461348ft feet 5.0-6.0711.7 Cross Slope (PAR)SF17714.0to $120 $2,0701461358ft feet 6.0-7.0718.3 Cross Slope (PAR)SF17720.5to $120 $1,9801461368ft $472,230.00TOTAL COST FOR:ALCOA AVEWside of Starting at:6118 ALCOA AVE (OPP SIDE OF ST) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 397 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 6140 ALCOA AVE Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121045 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet 3.0-4.00.5 Cross Slope (PAR)SF142.3to $120 $1,6741465118ft feet 2.0-3.02.3 Cross Slope (PAR)SF478.3to $120 $5,5801465128ft feet 4.0-5.08.3 Cross Slope (PAR)SF3312.6to $120 $3,9991465138ft feet13.9 Driveway39.3to165025 feet 3.0-4.041.1 Cross Slope (PAR)SF942.2to $120 $1,0231465148ft feet .3343.0 Vertical Change LF844.0to $75 $5811353518ft feet 3.0-4.050.5 Cross Slope (PAR)SF6659.0to $120 $7,9051465158ft feet 5.0-6.059.4 Cross Slope (PAR)SF16780.9to $120 $19,9951465168ft feet -.2765.5 Vertical Change REF866.5to135352 8 ft feet 3.0-4.080.9 Cross Slope (PAR)SF184104.6to $120 $22,0411465178ft feet 5.0-6.0104.6 Cross Slope (PAR)SF42110.0to $120 $5,0221465188ft feet 3.0-4.0110.9 Cross Slope (PAR)SF627191.8to $120 $75,2371465198ft feet .28158.8 Vertical Change REF8159.8to135353 8 ft feet -.26180.8 Vertical Change REF8181.8to135354 8 ft feet 3.0-4.0194.8 Cross Slope (PAR)SF22197.6to $120 $2,6041465208ft feet 5.0-6.0198.6 Cross Slope (PAR)SF16200.6to $120 $1,8601465218ft feet 2.0-3.0203.1 Cross Slope (PAR)SF31207.1to $120 $3,7201465228ft feet 4.0-5.0207.1 Cross Slope (PAR)SF29210.8to $120 $3,4411465238ft feet 2.0-3.0210.8 Cross Slope (PAR)SF19213.2to $120 $2,2321465248ft feet213.2 Driveway252.6to165026 feet 2.0-3.0252.8 Cross Slope (Driveway)SF29256.5to $40 $1,1471465258ft feet 2.0-3.0258.9 Cross Slope (PAR)SF38263.8to $120 $4,5571465268ft feet 1.02259.0 Vertical Change REF8260.0to135355 8 ft feet -.29264.4 Vertical Change LF26267.7to $75 $1,9181353568ft feet 3.0-4.0265.9 Cross Slope (PAR)SF61273.8to $120 $7,3471465278ft feet .38269.0 Vertical Change REF8270.0to135357 8 ft feet 2.0-3.0273.8 Cross Slope (PAR)SF12275.3to $120 $1,3951465288ft feet -.27276.0 Vertical Change LF8277.0to $75 $5811353588ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 398 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 6140 ALCOA AVE Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121045 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet276.1 Driveway314.8to165027 feet 2.0-3.0316.5 Cross Slope (PAR)SF37321.3to $120 $4,4641465298ft feet -.31319.6 Vertical Change REF8320.6to135360 8 ft feet 4.0-5.0321.3 Cross Slope (PAR)SF871433.7to $120 $104,5321465308ft feet .35376.4 Vertical Change REF8377.4to135361 8 ft feet -.29394.5 Vertical Change REF8395.5to135363 8 ft feet .52428.6 Vertical Change REF8429.6to135364 8 ft feet 4.0-5.0436.0 Cross Slope (PAR)SF189460.4to $120 $22,6921465318ft feet .3448.0 Vertical Change REF8449.0to135365 8 ft feet .59458.7 Vertical Change REF8459.7to135366 8 ft feet 7.0-8.0461.3 Cross Slope (PAR)SF31465.3to $120 $3,7201465328ft feet -.54463.6 Vertical Change REF8464.6to135367 8 ft feet 5.0-6.0465.3 Cross Slope (PAR)SF50471.8to $120 $6,0451465338ft feet .75471.0 Vertical Change REF8472.0to135369 8 ft feet 3.0-4.0471.8 Cross Slope (PAR)SF8472.8to $120 $9301465348ft feet 2.0-3.0472.8 Cross Slope (PAR)SF9473.9to $120 $1,0231465358ft feet 2.0-3.0476.3 Cross Slope (PAR)SF42481.7to $120 $5,0221465368ft feet 4.0-5.0481.7 Cross Slope (PAR)SF94493.8to $120 $11,2531465378ft feet 4.0-5.0496.1 Cross Slope (PAR)SF25499.3to $120 $2,9761465388ft feet -.31497.8 Vertical Change REF8498.8to135370 8 ft feet 5.0-6.0501.8 Cross Slope (PAR)SF85512.8to $120 $10,2301465398ft feet .4510.4 Vertical Change REF22513.3to135371 8 ft feet 5.0-6.0515.6 Cross Slope (PAR)SF87526.8to $120 $10,4161465408ft feet 3.0-4.0526.8 Cross Slope (PAR)SF120542.3to $120 $14,4151465418ft feet -.26527.6 Vertical Change REF8528.6to135372 8 ft feet .62532.0 Vertical Change REF8533.0to135373 8 ft feet -.34538.2 Vertical Change REF8539.2to135374 8 ft feet 5.0-6.0542.8 Cross Slope (PAR)SF370590.5to $120 $44,3611465428ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 399 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 6140 ALCOA AVE Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121045 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet -.3548.9 Vertical Change REF8549.9to135375 8 ft feet .62551.8 Vertical Change REF8552.8to135376 8 ft feet -.42581.0 Vertical Change REF8582.0to135377 8 ft feet .41585.4 Vertical Change REF8586.4to135378 8 ft feet 6.0-7.0591.7 Cross Slope (PAR)SF16593.8to $120 $1,9531465438ft feet 7.0-8.0596.3 Cross Slope (PAR)SF81606.8to $120 $9,7651465448ft feet -.35598.2 Vertical Change REF8599.2to135379 8 ft feet 5.0-6.0606.8 Cross Slope (PAR)SF21609.5to $120 $2,5111465458ft feet 6.0-7.0610.0 Cross Slope (PAR)SF12611.5to $120 $1,3951465468ft feet 5.0-6.0611.7 Cross Slope (PAR)SF36616.3to $120 $4,2781465478ft feet 1.91616.5 Vertical Change SF8617.5to $75 $5811353808ft feet617.3 Driveway649.7to165028 feet 2.0-3.0649.7 Cross Slope (Driveway)SF13651.4to $40 $5271465488ft feet 4.0-5.0652.3 Cross Slope (PAR)SF126668.6to $120 $15,1591465498ft feet 2.31652.8 Vertical Change REF8653.8to135381 8 ft feet 2.95657.3 Vertical Change REF8658.3to135382 8 ft feet 3.51659.6 Vertical Change REF8660.6to135383 8 ft feet -.51661.7 Vertical Change REF8662.7to135384 8 ft feet 2.0-3.0669.1 Cross Slope (PAR)SF26672.4to $120 $3,0691465508ft feet 3.46673.2 Vertical Change REF26676.5to135385 8 ft feet 4.0-5.0673.2 Cross Slope (PAR)SF35677.7to $120 $4,1851465518ft feet678.4 Driveway711.3to165029 feet 3.57680.0 Vertical Change REF8681.0to135386 8 ft feet 3.0-4.0711.8 Cross Slope (PAR)SF81722.3to $120 $9,7651465528ft feet 2.0-3.0723.2 Cross Slope (PAR)SF24726.3to $120 $2,8831465538ft feet 4.0-5.0726.3 Cross Slope (PAR)SF150745.6to $120 $17,9491465548ft feet 3.0-4.0748.2 Cross Slope (PAR)SF145766.9to $120 $17,3911465558ft feet 2.0-3.0766.9 Cross Slope (PAR)SF9768.1to $120 $1,1161465568ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 400 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 6140 ALCOA AVE Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121045 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet 2.0-3.0772.8 Cross Slope (PAR)SF12774.3to $120 $1,3951465578ft feet 2.0-3.0780.0 Cross Slope (PAR)SF157800.3to $120 $18,8791465588ft feet 4.0-5.0800.6 Cross Slope (PAR)SF584875.9to $120 $70,0291465598ft feet 2.0-3.0876.9 Cross Slope (PAR)SF19879.3to $120 $2,2321465608ft feet880.1 Driveway913.3to165030 feet .36901.3 Vertical Change REF8902.3to135387 8 ft feet 3.0-4.0913.9 Cross Slope (PAR)SF29917.6to $120 $3,4411465618ft feet 5.0-6.0918.5 Cross Slope (PAR)SF45924.3to $120 $5,3941465628ft feet -.26918.6 Vertical Change REF8919.6to135388 8 ft feet 3.0-4.0924.3 Cross Slope (PAR)SF8925.3to $120 $9301465638ft feet 3.0-4.0928.2 Cross Slope (PAR)SF30932.1to $120 $3,6271465648ft feet 2.0-3.0932.1 Cross Slope (PAR)SF79942.3to $120 $9,4861465658ft feet 4.0-5.0942.3 Cross Slope (PAR)SF65950.7to $120 $7,8121465668ft feet 3.0-4.0952.8 Cross Slope (PAR)SF225981.8to $120 $26,9701465678ft feet -.31984.0 Vertical Change LF8985.0to $75 $5811353898ft feet 5.0-6.0986.3 Cross Slope (PAR)SF56993.5to $120 $6,6961465688ft feet 3.0-4.0993.8 Cross Slope (PAR)SF781003.8to $120 $9,3001465698ft feet 3.0-4.01006.2 Cross Slope (PAR)SF1061019.9to $120 $12,7411465708ft feet 2.0-3.01019.9 Cross Slope (PAR)SF1741042.4to $120 $20,9251465718ft feet 4.0-5.01042.8 Cross Slope (PAR)SF1541062.7to $120 $18,5071465728ft feet 2.0-3.01062.7 Cross Slope (PAR)SF691071.6to $120 $8,2771465738ft feet 2.0-3.01073.8 Cross Slope (PAR)SF1121088.3to $120 $13,4851465748ft feet 4.0-5.01088.7 Cross Slope (PAR)SF431094.3to $120 $5,2081465758ft feet 2.0-3.01095.1 Cross Slope (PAR)SF1061108.8to $120 $12,7411465768ft feet 4.0-5.01109.4 Cross Slope (PAR)SF301113.3to $120 $3,6271465778ft feet1114.5 Driveway1148.6to165031 feet .41125.1 Vertical Change REF81126.1to135390 8 ft feet 2.0-3.01148.6 Cross Slope (Driveway)SF131150.3to $40 $5271465788ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 401 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side 6140 ALCOA AVE Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121045 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet 4.0-5.01152.3 Cross Slope (PAR)SF531159.1to $120 $6,3241465798ft feet 4.0-5.01161.2 Cross Slope (PAR)SF4421218.2to $120 $53,0101465808ft $830,610.13TOTAL COST FOR:ALCOA AVEEside of Starting at:6140 ALCOA AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 402 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S / E ALCOA AVE Street Side 6199 MALBURG WY Survey Street Name Starting Street Name 6140 ALCOA AVE End Street Name 1912121012 Run ID Alcoa Ave 78.25 ID Sidewalk Width Priority feet .352.3 Vertical Change LF43.3to $75 $3001353914ft feet 5.0-6.04.5 Running Slope SF55.8to $120 $6241664574ft feet -.265.6 Vertical Change LF46.6to $75 $3001353924ft feet 2.0-3.06.8 Cross Slope (PAR)SF6222.4to $120 $7,4881465814ft feet .289.5 Vertical Change REF410.5to135393 4 ft feet 1.0312.7 Vertical Change REF413.7to135394 4 ft feet 1.8315.1 Vertical Change REF416.1to135395 4 ft feet22.4 Cold Patch 1425.8to140301 4 ft feet 2.0-3.026.2 Cross Slope (PAR)SF12256.7to $120 $14,6401465824ft feet .2754.5 Vertical Change REF455.5to135396 4 ft feet 4.0-5.056.7 Cross Slope (PAR)SF3565.4to $120 $4,1761465834ft feet 2.0-3.065.4 Cross Slope (PAR)SF666.9to $120 $7201465844ft feet -.5966.3 Vertical Change REF467.3to135398 4 ft feet .5770.9 Vertical Change SF471.9to $75 $3001353994ft feet .5174.1 Vertical Change SF1176.8to $75 $8101354004ft feet100.1 Cold Patch 12103.0to140302 4 ft feet -.27107.5 Vertical Change LF4108.5to $75 $3001354014ft feet 2.0-3.0109.3 Cross Slope (PAR)SF10111.7to $120 $1,1521465854ft feet .59113.7 Vertical Change SF4114.7to $75 $3001354034ft feet -.38115.4 Vertical Change LF4116.4to $75 $3001354044ft feet .29117.2 Vertical Change LF4118.2to $75 $3001354054ft feet .27120.6 Vertical Change LF4121.6to $75 $3001354064ft feet -.39122.9 Vertical Change LF4123.9to $75 $3001354074ft feet .79125.0 Vertical Change SF4126.0to $75 $3001354084ft feet .44126.8 Vertical Change LF17131.1to $75 $1,2901354094ft feet .37133.9 Vertical Change LF4134.9to $75 $3001354104ft feet146.0 Cold Patch 14149.5to140303 4 ft feet -.28148.3 Vertical Change LF4149.3to $75 $3001354114ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 403 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S / E ALCOA AVE Street Side 6199 MALBURG WY Survey Street Name Starting Street Name 6140 ALCOA AVE End Street Name 1912121012 Run ID Alcoa Ave 78.25 ID Sidewalk Width Priority feet 2.0-3.0150.1 Cross Slope (PAR)SF79169.8to $120 $9,4561465864ft feet 2.91168.0 Vertical Change REF4169.0to135412 4 ft feet .67175.9 Vertical Change REF4176.9to135413 4 ft feet 2.0-3.0176.0 Cross Slope (PAR)SF23181.7to $120 $2,7361465874ft feet 4.0-5.0181.7 Cross Slope (PAR)SF15185.4to $120 $1,7761465884ft feet 2.0-3.0185.4 Cross Slope (PAR)SF8187.5to $120 $1,0081465894ft feet187.5 Driveway213.9to165032 feet 2.87189.2 Vertical Change REF4190.2to135414 4 ft feet -.28210.6 Vertical Change REF4211.6to135415 4 ft feet .74212.4 Vertical Change REF4213.4to135416 4 ft feet 3.0-4.0213.9 Cross Slope (Driveway)SF62229.5to $40 $2,4961465904ft feet -.37221.0 Vertical Change REF12223.9to135417 4 ft feet 2.0-3.0230.3 Cross Slope (PAR)SF75249.1to $120 $9,0241465914ft feet 4.0-5.0249.1 Cross Slope (PAR)SF160289.1to $120 $19,2001465924ft feet -.46284.3 Vertical Change REF4285.3to135419 4 ft feet .51290.4 Vertical Change SF4291.4to $75 $3001354204ft feet 4.0-5.0292.7 Cross Slope (PAR)SF33301.0to $120 $3,9841465934ft feet 2.0-3.0301.0 Cross Slope (PAR)SF67317.8to $120 $8,0641465944ft feet -.49312.6 Vertical Change REF4313.6to135421 4 ft feet 2.14316.7 Vertical Change REF4317.7to135422 4 ft feet317.9 Driveway348.9to165033 feet 2.0-3.0349.8 Cross Slope (PAR)SF196398.7to $120 $23,4721465954ft feet 3.0-4.0405.8 Cross Slope (PAR)SF46417.3to $120 $5,5201465964ft feet 2.0-3.0417.3 Cross Slope (PAR)SF53430.6to $120 $6,3841465974ft feet 4.0-5.0431.7 Cross Slope (PAR)SF34440.1to $120 $4,0321465984ft feet 2.0-3.0440.1 Cross Slope (PAR)SF70457.6to $120 $8,4001465994ft feet 3.0-4.0460.3 Cross Slope (PAR)SF20465.2to $120 $2,3521466004ft feet 3.0-4.0468.8 Cross Slope (PAR)SF67485.5to $120 $8,0161466014ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 404 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S / E ALCOA AVE Street Side 6199 MALBURG WY Survey Street Name Starting Street Name 6140 ALCOA AVE End Street Name 1912121012 Run ID Alcoa Ave 78.25 ID Sidewalk Width Priority feet 3.0-4.0487.7 Cross Slope (PAR)SF144523.8to $120 $17,3281466024ft feet 2.0-3.0523.8 Cross Slope (PAR)SF15527.5to $120 $1,7761466034ft feet 4.0-5.0527.5 Cross Slope (PAR)SF197576.8to $120 $23,6641466044ft feet -.31549.1 Vertical Change REF4550.1to135423 4 ft feet .48573.2 Vertical Change REF4574.2to135424 4 ft feet 2.0-3.0577.8 Cross Slope (PAR)SF36586.9to $120 $4,3681466054ft feet 4.0-5.0586.9 Cross Slope (PAR)SF61602.1to $120 $7,2961466064ft feet .62601.4 Vertical Change REF4602.4to135425 4 ft feet 2.0-3.0603.2 Cross Slope (PAR)SF50615.8to $120 $6,0481466074ft feet 5.0-6.0618.3 Cross Slope (PAR)SF169660.6to $120 $20,3041466084ft feet 3.0-4.0661.0 Cross Slope (PAR)SF9663.2to $120 $1,0561466094ft feet665.4 Driveway698.4to165034 feet .31680.9 Vertical Change REF4681.9to135426 4 ft feet 2.0-3.0698.8 Cross Slope (PAR)SF52711.9to $120 $6,2881466104ft feet 4.0-5.0711.9 Cross Slope (PAR)SF52724.9to $120 $6,2401466114ft feet 2.0-3.0726.0 Cross Slope (PAR)SF50738.6to $120 $6,0481466124ft feet 4.0-5.0740.9 Cross Slope (PAR)SF4742.0to $120 $5281466134ft feet742.5 Driveway773.5to165035 feet .32742.8 Vertical Change REF4743.8to135427 4 ft feet .26757.9 Vertical Change REF4758.9to135428 4 ft feet 2.0-3.0775.3 Cross Slope (PAR)SF30782.9to $120 $3,6481466144ft feet 4.0-5.0782.9 Cross Slope (PAR)SF20787.9to $120 $2,4001466154ft feet 2.0-3.0787.9 Cross Slope (PAR)SF51800.6to $120 $6,0961466164ft feet 4.0-5.0800.6 Cross Slope (PAR)SF22806.0to $120 $2,5921466174ft feet .26800.7 Vertical Change REF4801.7to135429 4 ft feet .32807.3 Vertical Change LF4808.3to $75 $3001354304ft feet809.8 Driveway846.6to165036 feet .27838.9 Vertical Change REF4839.9to135431 4 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 405 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S / E ALCOA AVE Street Side 6199 MALBURG WY Survey Street Name Starting Street Name 6140 ALCOA AVE End Street Name 1912121012 Run ID Alcoa Ave 78.25 ID Sidewalk Width Priority feet 3.0-4.0847.0 Cross Slope (Driveway)SF6848.5to $40 $2401466184ft feet 6.0-7.0849.7 Cross Slope (PAR)SF20854.7to $120 $2,4001466194ft feet 5.0-6.0854.7 Cross Slope (PAR)SF47866.4to $120 $5,6161466204ft feet -.33863.5 Vertical Change REF4864.5to135432 4 ft feet 3.0-4.0866.4 Cross Slope (PAR)SF64882.3to $120 $7,6321466214ft feet 3.0-4.0884.5 Cross Slope (PAR)SF218938.9to $120 $26,1121466224ft feet -.27938.5 Vertical Change REF4939.5to135433 4 ft feet 2.0-3.0938.9 Cross Slope (PAR)SF73957.2to $120 $8,7841466234ft feet .28943.1 Vertical Change REF4944.1to135434 4 ft feet -.27949.4 Vertical Change REF4950.4to135435 4 ft feet 3.0-4.0960.3 Cross Slope (PAR)SF19965.1to $120 $2,3041466244ft feet 2.0-3.0965.7 Cross Slope (PAR)SF46977.3to $120 $5,5681466254ft $325,356.00TOTAL COST FOR:ALCOA AVES / E side of Starting at:6199 MALBURG WY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 406 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E 44TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001141543 Run ID Alcoa Ave 54 ID Sidewalk Width Priority feet 2.0-3.04.8 Cross Slope (PAR)SF4510.8to $120 $5,4001532078ft feet -1.57.4 Vertical Change REF88.4to137208 8 ft feet 4.0-5.012.3 Cross Slope (PAR)SF2916.1to $120 $3,4201532088ft feet 2.0-3.017.3 Cross Slope (PAR)SF1419.1to $120 $1,6201532098ft feet .2917.7 Vertical Change REF818.7to137209 8 ft feet 4.0-5.020.4 Cross Slope (PAR)SF10534.4to $120 $12,6001532108ft feet 3.0-4.037.3 Cross Slope (PAR)SF4042.6to $120 $4,7701532118ft feet 3.0-4.045.7 Cross Slope (PAR)SF5753.3to $120 $6,8401532128ft feet 3.0-4.058.8 Cross Slope (PAR)SF347105.1to $120 $41,6701532138ft feet .3696.7 Vertical Change REF897.7to137210 8 ft feet 2.0-3.0105.3 Cross Slope (PAR)SF18107.7to $120 $2,1601532148ft feet 1.11106.5 Vertical Change REF8107.5to137211 8 ft feet 2.0-3.0119.7 Cross Slope (PAR)SF12121.3to $120 $1,4401532158ft feet123.5 Driveway145.3to165603 feet 3.0-4.0145.3 Cross Slope (Driveway)SF68154.4to $40 $2,7301532168ft feet 4.0-5.0156.6 Cross Slope (PAR)SF202183.5to $120 $24,2101532178ft feet158.8 Continuous Width SF8159.8to $120 $9001673878ft feet177.8 Continuous Width SF8178.8to $120 $9001673748ft feet 2.0-3.0183.5 Cross Slope (PAR)SF72193.1to $120 $8,6401532188ft feet 4.0-5.0194.3 Cross Slope (PAR)SF10195.6to $120 $1,1701532198ft feet 3.0-4.0200.3 Cross Slope (PAR)SF20202.9to $120 $2,3401532208ft feet 2.0-3.0203.2 Cross Slope (PAR)SF17205.4to $120 $1,9801532218ft feet205.3 Continuous Width SF8206.3to $120 $9001668028ft feet 2.0-3.0209.7 Cross Slope (PAR)SF9210.9to $120 $1,0801532228ft feet 2.0-3.0216.9 Cross Slope (PAR)SF23219.9to $120 $2,7001532238ft feet 4.0-5.0219.9 Cross Slope (PAR)SF33224.3to $120 $3,9601532248ft feet221.5 Continuous Width SF8222.5to $120 $9001672788ft feet224.8 Driveway251.7to165604 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 407 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E 44TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001141543 Run ID Alcoa Ave 54 ID Sidewalk Width Priority feet -.26231.9 Vertical Change REF8232.9to137213 8 ft $132,330.00TOTAL COST FOR:ALCOA AVEEside of Starting at:E 44TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 408 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 44TH ST Survey Street Name Starting Street Name E 46TH ST End Street Name 2001141509 Run ID Alcoa Ave 58 ID Sidewalk Width Priority feet 3.0-4.01.3 Cross Slope (PAR)SF20323.2to $120 $24,3091533589ft feet .7923.6 Vertical Change REF924.6to137240 9 ft feet 2.0-3.023.8 Cross Slope (PAR)SF20846.3to $120 $24,9751533599ft feet -1.0850.5 Vertical Change SF951.5to $75 $6941372419ft feet 2.0-3.052.1 Cross Slope (PAR)SF2454.7to $120 $2,8861533609ft feet 2.0-3.059.9 Cross Slope (PAR)SF5265.5to $120 $6,2161533619ft feet -.3568.4 Vertical Change LF969.4to $75 $6941372429ft feet 3.0-4.070.3 Cross Slope (PAR)SF1271.6to $120 $1,4431533629ft feet -.4272.0 Vertical Change REF973.0to137243 9 ft feet 2.0-3.072.4 Cross Slope (PAR)SF1874.3to $120 $2,1091533639ft feet -.3476.4 Vertical Change REF977.4to137244 9 ft feet 2.0-3.077.0 Cross Slope (PAR)SF12090.0to $120 $14,4301533649ft feet .5889.2 Vertical Change REF990.2to137245 9 ft feet92.1 Continuous Width SF993.1to $120 $1,1101676449ft feet 2.0-3.092.9 Cross Slope (PAR)SF155109.7to $120 $18,6481533659ft feet105.3 Continuous Width REF9106.3to167757 9 ft feet 4.0-5.0109.7 Cross Slope (PAR)SF148125.7to $120 $17,7601533669ft feet 2.0-3.0126.0 Cross Slope (PAR)SF260154.1to $120 $31,1911533679ft feet 2.0-3.0169.3 Cross Slope (PAR)SF148185.3to $120 $17,7601533689ft feet 2.0-3.0190.0 Cross Slope (PAR)SF24192.6to $120 $2,8861533699ft feet 4.0-5.0192.6 Cross Slope (PAR)SF47197.7to $120 $5,6611533709ft feet197.6 Continuous Width REF9198.6to167758 9 ft feet 2.0-3.0197.7 Cross Slope (PAR)SF20199.9to $120 $2,4421533719ft feet 3.0-4.0205.0 Cross Slope (PAR)SF25207.7to $120 $2,9971533729ft feet 2.0-3.0207.7 Cross Slope (PAR)SF84216.8to $120 $10,1011533739ft feet 4.0-5.0216.8 Cross Slope (PAR)SF176235.8to $120 $21,0901533749ft feet236.3 Driveway253.6to165614 feet 3.0-4.0256.3 Cross Slope (PAR)SF53262.0to $120 $6,3271533759ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 409 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 44TH ST Survey Street Name Starting Street Name E 46TH ST End Street Name 2001141509 Run ID Alcoa Ave 58 ID Sidewalk Width Priority feet258.5 Continuous Width SF9259.5to $120 $1,1101668109ft feet 4.0-5.0264.3 Cross Slope (PAR)SF19266.4to $120 $2,3311533769ft feet 2.0-3.0269.9 Cross Slope (PAR)SF12271.2to $120 $1,4431533779ft feet 3.0-4.0274.1 Cross Slope (PAR)SF43278.8to $120 $5,2171533789ft feet 2.0-3.0279.2 Cross Slope (PAR)SF157296.2to $120 $18,8701533799ft feet288.3 Continuous Width SF9289.3to $120 $1,1101669219ft feet -.26293.0 Vertical Change REF9294.0to137246 9 ft feet294.3 Continuous Width SF9295.3to $120 $1,1101674619ft feet 4.0-5.0302.3 Cross Slope (PAR)SF180321.8to $120 $21,6451533809ft feet 3.0-4.0324.2 Cross Slope (PAR)SF15325.8to $120 $1,7761533819ft feet 2.0-3.0327.3 Cross Slope (PAR)SF106338.8to $120 $12,7651533829ft feet 3.0-4.0341.3 Cross Slope (PAR)SF18343.2to $120 $2,1091533839ft feet 2.0-3.0344.4 Cross Slope (PAR)SF115356.8to $120 $13,7641533849ft feet 4.0-5.0358.5 Cross Slope (PAR)SF141373.7to $120 $16,8721533859ft feet 2.0-3.0373.7 Cross Slope (PAR)SF325408.8to $120 $38,9611533869ft feet 2.0-3.0413.1 Cross Slope (PAR)SF76421.3to $120 $9,1021533879ft feet 3.0-4.0424.0 Cross Slope (PAR)SF30427.2to $120 $3,5521533889ft feet 2.0-3.0428.3 Cross Slope (PAR)SF31431.7to $120 $3,7741533899ft feet433.8 Continuous Width SF9434.8to $120 $1,1101673379ft feet 2.0-3.0436.3 Cross Slope (PAR)SF97446.8to $120 $11,6551533909ft feet .38441.5 Vertical Change REF9442.5to137247 9 ft feet 2.0-3.0449.5 Cross Slope (PAR)SF21451.8to $120 $2,5531533919ft feet 4.0-5.0451.8 Cross Slope (PAR)SF171470.3to $120 $20,5351533929ft feet .36454.1 Vertical Change REF9455.1to137248 9 ft feet462.3 Continuous Width SF9463.3to $120 $1,1101671679ft $408,202.50TOTAL COST FOR:ALCOA AVEWside of Starting at:E 44TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 410 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 46TH ST Survey Street Name Starting Street Name LEONIS BLVD End Street Name 1912201152 Run ID Alcoa Ave 68 ID Sidewalk Width Priority feet 3.0-4.01.3 Cross Slope (PAR)SF538.8to $120 $6,3001474577ft feet 2.0-3.08.8 Cross Slope (PAR)SF1010.3to $120 $1,2601474587ft feet 2.0-3.014.5 Cross Slope (PAR)SF2518.1to $120 $3,0241474597ft feet -.2718.5 Vertical Change LF719.5to $75 $5251357217ft feet18.5 Driveway41.0to165117 feet 2.0-3.042.5 Cross Slope (PAR)SF2045.3to $120 $2,3521474607ft feet 2.0-3.047.8 Cross Slope (PAR)SF3853.2to $120 $4,5361474617ft feet 2.0-3.056.2 Cross Slope (PAR)SF2259.3to $120 $2,6041474627ft feet72.7 Driveway95.3to165118 feet .2874.8 Vertical Change REF775.8to135722 7 ft feet 3.0-4.0100.0 Cross Slope (PAR)SF34104.8to $120 $4,0321474637ft feet 2.0-3.0104.8 Cross Slope (PAR)SF12106.5to $120 $1,4281474647ft feet 2.0-3.0108.7 Cross Slope (PAR)SF22111.8to $120 $2,6041474657ft feet -.34119.7 Vertical Change REF7120.7to135723 7 ft feet 2.0-3.0120.4 Cross Slope (PAR)SF139140.3to $120 $16,7161474667ft feet .27122.0 Vertical Change REF7123.0to135724 7 ft feet 3.0-4.0142.8 Cross Slope (PAR)SF35147.8to $120 $4,2001474677ft feet 2.0-3.0148.1 Cross Slope (PAR)SF31152.5to $120 $3,6961474687ft feet153.3 Driveway176.1to165119 feet .36156.0 Vertical Change REF7157.0to135725 7 ft feet 2.0-3.0177.4 Cross Slope (PAR)SF69187.3to $120 $8,3161474697ft feet 4.0-5.0187.3 Cross Slope (PAR)SF20190.1to $120 $2,3521474707ft feet 3.0-4.0194.1 Cross Slope (PAR)SF64203.3to $120 $7,7281474717ft feet 2.0-3.0203.3 Cross Slope (PAR)SF14205.3to $120 $1,6801474727ft feet206.3 Driveway229.8to165120 feet 3.0-4.0230.2 Cross Slope (Driveway)SF41236.0to $40 $1,6241474737ft feet 5.0-6.0236.0 Cross Slope (PAR)SF11237.6to $120 $1,3441474747ft feet 6.0-7.0237.6 Cross Slope (PAR)SF15239.8to $120 $1,8481474757ft feet 5.0-6.0239.8 Cross Slope (PAR)SF31244.2to $120 $3,6961474767ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 411 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 46TH ST Survey Street Name Starting Street Name LEONIS BLVD End Street Name 1912201152 Run ID Alcoa Ave 68 ID Sidewalk Width Priority feet 6.0-7.0244.7 Cross Slope (PAR)SF14246.7to $120 $1,6801474777ft feet245.0 Continuous Width REF7246.0to167336 7 ft feet 5.0-6.0248.9 Cross Slope (PAR)SF50256.0to $120 $5,9641474787ft feet .3252.1 Vertical Change REF7253.1to135726 7 ft feet 3.0-4.0256.0 Cross Slope (PAR)SF128274.3to $120 $15,3721474797ft feet 5.0-6.0275.6 Cross Slope (PAR)SF29279.7to $120 $3,4441474807ft feet286.6 Driveway313.3to165121 feet 3.0-4.0313.7 Cross Slope (PAR)SF9315.0to $120 $1,0921474817ft feet 2.0-3.0315.0 Cross Slope (PAR)SF78326.1to $120 $9,3241474827ft feet 2.0-3.0329.9 Cross Slope (PAR)SF13331.8to $120 $1,5961474837ft feet 2.0-3.0336.8 Cross Slope (PAR)SF34341.6to $120 $4,0321474847ft feet 3.23339.3 Vertical Change REF7340.3to135727 7 ft feet 5.0-6.0342.1 Cross Slope (PAR)SF20345.0to $120 $2,4361474857ft feet 3.0-4.0346.1 Cross Slope (PAR)SF106361.3to $120 $12,7681474867ft feet .3358.2 Vertical Change REF7359.2to135728 7 ft feet 2.0-3.0361.8 Cross Slope (PAR)SF35366.8to $120 $4,2001474877ft feet 2.0-3.0373.6 Cross Slope (PAR)SF23376.9to $120 $2,7721474887ft feet 2.0-3.0389.2 Cross Slope (PAR)SF16391.5to $120 $1,9321474897ft feet 4.0-5.0392.2 Cross Slope (PAR)SF74402.7to $120 $8,8201474907ft feet -.35399.2 Vertical Change REF7400.2to135729 7 ft feet .35401.4 Vertical Change REF7402.4to135730 7 ft feet 3.0-4.0405.1 Cross Slope (PAR)SF8406.2to $120 $9241474917ft feet 2.0-3.0409.4 Cross Slope (PAR)SF10410.8to $120 $1,1761474927ft feet 4.0-5.0414.4 Cross Slope (PAR)SF28418.4to $120 $3,3601474937ft feet 6.0-7.0419.4 Cross Slope (PAR)SF14421.4to $120 $1,6801474947ft feet 5.0-6.0421.4 Cross Slope (PAR)SF35426.4to $120 $4,2001474957ft feet 3.0-4.0426.4 Cross Slope (PAR)SF62435.2to $120 $7,3921474967ft feet 5.0-6.0435.2 Cross Slope (PAR)SF25438.8to $120 $3,0241474977ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 412 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 46TH ST Survey Street Name Starting Street Name LEONIS BLVD End Street Name 1912201152 Run ID Alcoa Ave 68 ID Sidewalk Width Priority feet 3.0-4.0438.8 Cross Slope (PAR)SF17441.2to $120 $2,0161474987ft feet 4.0-5.0443.9 Cross Slope (PAR)SF52451.3to $120 $6,2161474997ft feet .29452.3 Vertical Change REF7453.3to135731 7 ft feet 2.0-3.0453.0 Cross Slope (PAR)SF14455.0to $120 $1,6801475007ft feet 2.0-3.0474.3 Cross Slope (PAR)SF11475.8to $120 $1,2601475017ft feet 4.0-5.0476.7 Cross Slope (PAR)SF82488.4to $120 $9,8281475027ft feet 2.0-3.0488.9 Cross Slope (PAR)SF8490.0to $120 $9241475037ft feet 3.0-4.0493.0 Cross Slope (PAR)SF47499.7to $120 $5,6281475047ft feet 2.0-3.0500.0 Cross Slope (PAR)SF17502.4to $120 $2,0161475057ft $208,621.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E 46TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 413 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 46TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001141514 Run ID Alcoa Ave 74.25 ID Sidewalk Width Priority feet 6.0-7.01.8 Cross Slope (PAR)SF102.9to $120 $1,2211533259ft feet 5.0-6.02.9 Cross Slope (PAR)SF235.4to $120 $2,7751533269ft feet 6.0-7.06.2 Cross Slope (PAR)SF269.0to $120 $3,1081533279ft feet 4.0-5.012.4 Cross Slope (PAR)SF4116.8to $120 $4,8841533289ft feet 3.0-4.021.4 Cross Slope (PAR)SF1923.5to $120 $2,3311533299ft feet 3.0-4.028.8 Cross Slope (PAR)SF1029.9to $120 $1,2211533309ft feet 2.0-3.032.2 Cross Slope (PAR)SF1934.3to $120 $2,3311533319ft feet 3.0-4.041.0 Cross Slope (PAR)SF1142.2to $120 $1,3321533329ft feet 2.0-3.043.8 Cross Slope (PAR)SF7551.9to $120 $8,9911533339ft feet 4.0-5.054.6 Cross Slope (PAR)SF4859.8to $120 $5,7721533349ft feet 4.0-5.071.0 Cross Slope (PAR)SF7979.5to $120 $9,4351533359ft feet 2.0-3.080.2 Cross Slope (PAR)SF4084.5to $120 $4,7731533369ft feet 4.0-5.084.9 Cross Slope (PAR)SF309118.3to $120 $37,0741533379ft feet 3.0-4.0121.1 Cross Slope (PAR)SF20123.3to $120 $2,4421533389ft feet 2.0-3.0137.5 Cross Slope (PAR)SF21139.8to $120 $2,5531533399ft feet 4.0-5.0139.9 Cross Slope (PAR)SF32143.4to $120 $3,8851533409ft feet 2.0-3.0143.6 Cross Slope (PAR)SF34147.3to $120 $4,1071533419ft feet 2.0-3.0149.6 Cross Slope (PAR)SF46154.6to $120 $5,5501533429ft feet 3.0-4.0158.6 Cross Slope (PAR)SF105169.9to $120 $12,5431533439ft feet 2.0-3.0170.5 Cross Slope (PAR)SF16172.2to $120 $1,8871533449ft feet 4.0-5.0173.1 Cross Slope (PAR)SF11174.3to $120 $1,3321533459ft feet175.1 Driveway226.3to165612 feet175.1 Driveway349.6to165613 feet 5.0-6.0226.9 Cross Slope (Driveway)SF55232.8to $40 $2,1831533469ft feet 3.0-4.0233.8 Cross Slope (Driveway)SF38237.9to $40 $1,5171533479ft feet 3.0-4.0240.7 Cross Slope (Driveway)SF49246.0to $40 $1,9611533489ft feet 5.0-6.0247.8 Cross Slope (Driveway)SF19249.9to $40 $7771533499ft feet 3.0-4.0251.8 Cross Slope (Driveway)SF82260.7to $40 $3,2931533509ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 414 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 46TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001141514 Run ID Alcoa Ave 74.25 ID Sidewalk Width Priority feet259.8 Continuous Width SF9260.8to $120 $1,1101674229ft feet 4.0-5.0265.3 Cross Slope (Driveway)SF15266.9to $40 $5921533519ft feet 7.0-8.0268.2 Cross Slope (Driveway)SF22270.6to $40 $8881533529ft feet 4.0-5.0275.6 Cross Slope (Driveway)SF56281.6to $40 $2,2201533539ft feet 3.0-4.0284.0 Cross Slope (Driveway)SF240309.9to $40 $9,5831533549ft feet 2.0-3.0310.1 Cross Slope (Driveway)SF56316.1to $40 $2,2201533559ft feet 3.0-4.0320.0 Cross Slope (Driveway)SF249346.9to $40 $9,9531533569ft feet 2.0-3.0347.8 Cross Slope (Driveway)SF17349.6to $40 $6661533579ft feet 5.0-6.0347.8 Running Slope REF13349.2to166488 9 ft feet -.26348.4 Vertical Change REF9349.4to137239 9 ft $156,510.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E 46TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 415 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E 50TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912200952 Run ID Alcoa Ave 66 ID Sidewalk Width Priority feet2.3 Continuous Width SF53.3to $120 $5701674095ft feet 2.0-3.05.4 Cross Slope (PAR)SF19446.3to $120 $23,3131479485ft feet22.6 Continuous Width REF523.6to167214 5 ft feet -.335.4 Vertical Change REF536.4to135855 5 ft feet 4.0-5.046.3 Cross Slope (PAR)SF4154.9to $120 $4,9021479495ft feet 2.0-3.054.9 Cross Slope (PAR)SF9274.3to $120 $11,0581479505ft feet57.9 Continuous Width REF558.9to167715 5 ft feet 2.0-3.076.9 Cross Slope (PAR)SF2882.8to $120 $3,3631479515ft feet 4.0-5.082.8 Cross Slope (PAR)SF86101.0to $120 $10,3741479525ft feet96.7 Continuous Width REF597.7to167282 5 ft feet100.1 Continuous Width SF5101.1to $120 $5701675935ft feet 2.0-3.0101.0 Cross Slope (PAR)SF8102.6to $120 $9121479535ft feet112.8 Cold Patch 43121.8to140329 5 ft feet121.8 Driveway148.4to165170 feet -.43134.3 Vertical Change REF5135.3to135856 5 ft feet 4.0-5.0148.8 Cross Slope (PAR)SF20153.1to $120 $2,4511479545ft feet 2.0-3.0153.8 Cross Slope (PAR)SF5154.9to $120 $6271479555ft feet 2.0-3.0159.8 Cross Slope (PAR)SF8161.5to $120 $9691479565ft feet 2.0-3.0175.3 Cross Slope (PAR)SF20179.5to $120 $2,3941479575ft feet 2.0-3.0182.5 Cross Slope (PAR)SF29188.5to $120 $3,4201479585ft feet 2.0-3.0191.3 Cross Slope (PAR)SF14194.3to $120 $1,7101479595ft feet194.3 Driveway232.4to165171 feet -.28226.7 Vertical Change REF5227.7to135857 5 ft feet 2.0-3.0235.3 Cross Slope (PAR)SF41244.0to $120 $4,9591479605ft feet 2.0-3.0248.3 Cross Slope (PAR)SF150279.8to $120 $17,9551479615ft feet 4.0-5.0279.8 Cross Slope (PAR)SF16283.1to $120 $1,8811479625ft feet 2.0-3.0283.1 Cross Slope (PAR)SF68297.4to $120 $8,1511479635ft feet 2.0-3.0303.6 Cross Slope (PAR)SF56315.4to $120 $6,7261479645ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 416 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E 50TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912200952 Run ID Alcoa Ave 66 ID Sidewalk Width Priority feet .29306.8 Vertical Change REF17310.3to135858 5 ft feet315.8 Driveway368.7to165172 feet -.29316.1 Vertical Change REF5317.1to135859 5 ft $106,305.00TOTAL COST FOR:ALCOA AVEEside of Starting at:E 50TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 417 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 50TH ST Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912161215 Run ID Alcoa Ave 83.5 ID Sidewalk Width Priority feet 3.0-4.00.5 Cross Slope (PAR)SF5212.0to $120 $6,2101522375ft feet5.8 Continuous Width REF56.8to167270 5 ft feet 2.0-3.012.0 Cross Slope (PAR)SF1314.9to $120 $1,5661522385ft feet14.5 Continuous Width SF515.5to $120 $5401678295ft feet 3.0-4.017.2 Cross Slope (PAR)SF818.9to $120 $9181522395ft feet -.4620.4 Vertical Change LF521.4to $75 $3381369865ft feet 3.0-4.022.3 Cross Slope (PAR)SF523.3to $120 $5401522405ft feet 2.0-3.023.3 Cross Slope (PAR)SF3029.9to $120 $3,5641522415ft feet 2.0-3.034.4 Cross Slope (PAR)SF1237.0to $120 $1,4041522425ft feet 4.0-5.037.6 Cross Slope (PAR)SF7854.9to $120 $9,3421522435ft feet48.7 Continuous Width SF549.7to $120 $5401664105ft feet 2.0-3.054.9 Cross Slope (PAR)SF3663.0to $120 $4,3741522445ft feet 2.0-3.070.6 Cross Slope (PAR)SF2375.6to $120 $2,7001522455ft feet 6.0-7.077.3 Cross Slope (PAR)SF578.3to $120 $5401522465ft feet 5.0-6.078.3 Cross Slope (PAR)SF579.3to $120 $5401522475ft feet -.3880.4 Vertical Change REF581.4to136987 5 ft feet 3.0-4.080.8 Cross Slope (PAR)SF582.0to $120 $6481522485ft feet 2.0-3.082.0 Cross Slope (PAR)SF783.5to $120 $8101522495ft feet 2.0-3.088.7 Cross Slope (PAR)SF90108.7to $120 $10,8001522505ft feet88.8 Continuous Width SF589.8to $120 $5401678315ft feet105.9 Continuous Width SF5106.9to $120 $5401672695ft feet114.7 Continuous Width SF5115.7to $120 $5401678305ft feet 2.0-3.0130.3 Cross Slope (PAR)SF303197.6to $120 $36,3421522515ft feet -.76179.8 Vertical Change SF5180.8to $75 $3381369885ft feet .37191.0 Vertical Change REF5192.0to136989 5 ft feet 2.0-3.0200.9 Cross Slope (PAR)SF30207.6to $120 $3,6181522525ft feet201.4 Continuous Width SF5202.4to $120 $5401669685ft feet 2.0-3.0219.2 Cross Slope (PAR)SF19223.4to $120 $2,2681522535ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 418 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 50TH ST Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912161215 Run ID Alcoa Ave 83.5 ID Sidewalk Width Priority feet .3220.1 Vertical Change REF5221.1to136990 5 ft feet 2.0-3.0226.0 Cross Slope (PAR)SF31232.8to $120 $3,6721522545ft feet 5.0-6.0233.5 Cross Slope (PAR)SF5234.6to $120 $5941522555ft feet -.27235.2 Vertical Change LF5236.2to $75 $3381369915ft feet 3.0-4.0237.3 Cross Slope (PAR)SF39246.0to $120 $4,6981522565ft feet -.32241.7 Vertical Change REF16245.3to136992 5 ft feet .27247.2 Vertical Change LF5248.2to $75 $3381369935ft feet247.3 Cold Patch 41256.3to140470 5 ft feet257.4 Driveway274.7to165544 feet -.34258.1 Vertical Change REF5259.1to136994 5 ft feet .28271.1 Vertical Change REF5272.1to136995 5 ft feet 2.0-3.0276.2 Cross Slope (PAR)SF85295.0to $120 $10,1521522575ft feet 2.0-3.0297.3 Cross Slope (PAR)SF12300.0to $120 $1,4581522585ft feet 4.0-5.0300.4 Cross Slope (PAR)SF16304.0to $120 $1,9441522595ft feet .38300.5 Vertical Change REF5301.5to136996 5 ft feet -.3303.8 Vertical Change REF5304.8to136997 5 ft feet 2.0-3.0305.0 Cross Slope (PAR)SF32312.1to $120 $3,8341522605ft feet -.78308.9 Vertical Change REF5309.9to136998 5 ft feet319.3 Continuous Width SF5320.3to $120 $5401678325ft feet 2.0-3.0320.7 Cross Slope (PAR)SF22325.5to $120 $2,5921522615ft feet .26321.6 Vertical Change REF5322.6to136999 5 ft feet 3.0-4.0330.2 Cross Slope (PAR)SF36338.3to $120 $4,3741522625ft feet 2.0-3.0339.4 Cross Slope (PAR)SF42348.8to $120 $5,0761522635ft feet 4.0-5.0348.9 Cross Slope (PAR)SF26354.7to $120 $3,1321522645ft feet 2.0-3.0354.7 Cross Slope (PAR)SF7356.3to $120 $8641522655ft feet 2.0-3.0358.5 Cross Slope (PAR)SF6359.8to $120 $7021522665ft feet -.27359.4 Vertical Change REF5360.4to137000 5 ft feet 2.0-3.0362.6 Cross Slope (PAR)SF73378.8to $120 $8,7481522675ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 419 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E 50TH ST Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912161215 Run ID Alcoa Ave 83.5 ID Sidewalk Width Priority feet370.4 Continuous Width SF5371.4to $120 $5401673445ft feet 4.0-5.0378.8 Cross Slope (PAR)SF191421.3to $120 $22,9501522685ft feet -.28393.8 Vertical Change REF5394.8to137001 5 ft feet 2.0-3.0421.3 Cross Slope (PAR)SF118447.5to $120 $14,1481522695ft feet435.8 Continuous Width SF5436.8to $120 $5401678335ft feet .26442.2 Vertical Change REF5443.2to137002 5 ft feet -.29446.0 Vertical Change REF5447.0to137003 5 ft feet 4.0-5.0447.5 Cross Slope (PAR)SF104470.5to $120 $12,4201522705ft feet -.28458.9 Vertical Change LF5459.9to $75 $3381370045ft feet459.3 Continuous Width REF5460.3to166969 5 ft feet .26461.9 Vertical Change REF5462.9to137005 5 ft feet 3.0-4.0473.1 Cross Slope (PAR)SF23478.2to $120 $2,7541522715ft feet 4.0-5.0480.3 Cross Slope (PAR)SF26486.0to $120 $3,0781522725ft feet 2.0-3.0490.1 Cross Slope (PAR)SF5491.3to $120 $6481522735ft feet 3.0-4.0494.6 Cross Slope (PAR)SF13497.4to $120 $1,5121522745ft feet499.4 Continuous Width REF5500.4to167834 5 ft feet502.3 Continuous Width SF5503.3to $120 $5401669945ft feet -.31503.3 Vertical Change LF5504.3to $75 $3381370065ft $202,959.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E 50TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 420 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912121524 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet 6.0-7.00.0 Cross Slope (PAR)SF81.0to $120 $9601457988ft feet 5.0-6.01.0 Cross Slope (PAR)SF568.0to $120 $6,7201457998ft feet 6.0-7.08.0 Cross Slope (PAR)SF3612.5to $120 $4,3201458008ft feet 5.0-6.012.5 Cross Slope (PAR)SF23842.3to $120 $28,6081458018ft feet .3223.2 Vertical Change REF824.2to134936 8 ft feet 3.0-4.042.3 Cross Slope (PAR)SF1644.3to $120 $1,9201458028ft feet 2.0-3.044.3 Cross Slope (PAR)SF9055.6to $120 $10,8481458038ft feet 4.0-5.055.8 Cross Slope (PAR)SF27189.7to $120 $32,5441458048ft feet .6691.2 Vertical Change SF892.2to $75 $6001349388ft feet 4.0-5.093.2 Cross Slope (PAR)SF117107.8to $120 $14,0161458058ft feet109.5 Driveway154.2to164971 feet .27153.6 Vertical Change REF8154.6to134940 8 ft feet 4.0-5.0155.4 Cross Slope (PAR)SF245186.0to $120 $29,3761458068ft feet 3.0-4.0188.1 Cross Slope (PAR)SF332229.6to $120 $39,8401458078ft feet -.29190.8 Vertical Change REF8191.8to134941 8 ft feet229.6 Driveway281.8to164972 feet -.28263.9 Vertical Change REF8264.9to134942 8 ft feet 2.0-3.0285.1 Cross Slope (PAR)SF102297.8to $120 $12,1921458088ft feet 2.0-3.0314.7 Cross Slope (PAR)SF19317.1to $120 $2,3041458098ft feet .91318.0 Vertical Change SF8319.0to $75 $6001349438ft feet 2.0-3.0330.7 Cross Slope (PAR)SF97342.8to $120 $11,6161458108ft feet344.1 Driveway380.2to164973 feet 3.0-4.0381.0 Cross Slope (PAR)SF26384.3to $120 $3,1681458118ft feet 2.0-3.0384.3 Cross Slope (PAR)SF56391.3to $120 $6,7201458128ft feet 2.0-3.0394.7 Cross Slope (PAR)SF11396.1to $120 $1,3441458138ft feet 2.0-3.0412.3 Cross Slope (PAR)SF12413.8to $120 $1,4401458148ft feet 2.0-3.0417.5 Cross Slope (PAR)SF14419.2to $120 $1,6321458158ft feet .37424.0 Vertical Change LF8425.0to $75 $6001349448ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 421 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912121524 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet .3434.1 Vertical Change LF8435.1to $75 $6001349458ft feet 2.0-3.0443.8 Cross Slope (PAR)SF154463.1to $120 $18,5281458168ft feet .33450.3 Vertical Change REF8451.3to134946 8 ft feet -.38465.6 Vertical Change REF8466.6to134947 8 ft feet 2.0-3.0466.0 Cross Slope (PAR)SF103478.9to $120 $12,3841458178ft feet485.8 Driveway510.9to164974 feet .26489.9 Vertical Change REF8490.9to134948 8 ft feet -.27494.1 Vertical Change REF8495.1to134949 8 ft feet 2.0-3.0512.3 Cross Slope (PAR)SF8513.3to $120 $9601458188ft feet 2.0-3.0520.4 Cross Slope (PAR)SF49526.5to $120 $5,8561458198ft feet527.8 Driveway562.1to164975 feet .45535.9 Vertical Change REF8536.9to134950 8 ft feet 3.0-4.0563.2 Cross Slope (PAR)SF14565.0to $120 $1,7281458208ft feet 2.0-3.0565.0 Cross Slope (PAR)SF66573.3to $120 $7,9681458218ft feet571.6 Continuous Width SF8572.6to $120 $9601672688ft feet .26572.4 Vertical Change REF8573.4to134951 8 ft feet -.31575.1 Vertical Change LF8576.1to $75 $6001349528ft feet 2.0-3.0576.6 Cross Slope (PAR)SF14578.3to $120 $1,6321458228ft feet 2.0-3.0581.5 Cross Slope (PAR)SF66589.7to $120 $7,8721458238ft feet 4.0-5.0590.0 Cross Slope (PAR)SF47595.9to $120 $5,6641458248ft feet -.44593.9 Vertical Change REF8594.9to134953 8 ft feet596.2 Continuous Width SF8597.2to $120 $9601678608ft feet .33596.5 Vertical Change LF8597.5to $75 $6001349548ft feet 3.0-4.0599.0 Cross Slope (PAR)SF10600.3to $120 $1,2481458258ft feet 2.0-3.0600.3 Cross Slope (PAR)SF64608.3to $120 $7,6801458268ft feet 4.0-5.0608.8 Cross Slope (PAR)SF64616.8to $120 $7,6801458278ft feet616.8 Driveway635.2to164976 feet 4.0-5.0635.2 Cross Slope (Driveway)SF237664.8to $40 $9,4721458288ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 422 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912121524 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet 2.0-3.0664.8 Cross Slope (PAR)SF158684.5to $120 $18,9121458298ft feet .3666.7 Vertical Change REF8667.7to134955 8 ft feet671.3 Continuous Width REF8672.3to167172 8 ft feet .32676.3 Vertical Change REF8677.3to134956 8 ft feet 3.0-4.0692.3 Cross Slope (PAR)SF87703.2to $120 $10,4641458308ft feet -.73702.9 Vertical Change REF8703.9to134957 8 ft feet704.9 Driveway726.8to164433 feet704.9 Driveway834.8to164434 feet .32725.2 Vertical Change REF8726.2to134959 8 ft feet 4.0-5.0728.2 Cross Slope (Driveway)SF17730.3to $40 $6721458318ft feet 3.0-4.0732.4 Cross Slope (Driveway)SF129748.5to $40 $5,1521458328ft feet734.5 Continuous Width SF8735.5to $120 $9601678598ft feet 3.0-4.0750.6 Cross Slope (Driveway)SF55757.5to $40 $2,2081458338ft feet 4.0-5.0759.6 Cross Slope (Driveway)SF23762.5to $40 $9281458348ft feet 2.0-3.0763.9 Cross Slope (Driveway)SF35768.3to $40 $1,4081458358ft feet768.1 Continuous Width SF8769.1to $120 $9601671248ft feet 4.0-5.0768.8 Cross Slope (Driveway)SF36773.3to $40 $1,4401458368ft feet 4.0-5.0775.6 Cross Slope (Driveway)SF15777.5to $40 $6081458378ft feet 5.0-6.0779.6 Cross Slope (Driveway)SF22782.3to $40 $8641458388ft feet 6.0-7.0783.1 Cross Slope (Driveway)SF14784.9to $40 $5761458398ft feet -.4786.3 Vertical Change REF8787.3to134960 8 ft feet 4.0-5.0788.0 Cross Slope (Driveway)SF8789.0to $40 $3201458408ft feet 2.7788.7 Vertical Change REF8789.7to134961 8 ft feet 4.0-5.0791.8 Cross Slope (Driveway)SF54798.5to $40 $2,1441458418ft feet 5.0-6.0801.8 Cross Slope (Driveway)SF27805.2to $40 $1,0881458428ft feet805.0 Continuous Width SF8806.0to $120 $9601672808ft feet .36813.2 Vertical Change REF8814.2to134962 8 ft feet 3.0-4.0813.5 Cross Slope (Driveway)SF10814.8to $40 $4161458438ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 423 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912121524 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet .44818.3 Vertical Change REF8819.3to134963 8 ft feet 2.0-3.0819.6 Cross Slope (Driveway)SF14821.3to $40 $5441458448ft feet .33821.6 Vertical Change REF8822.6to134964 8 ft feet -.29824.8 Vertical Change REF8825.8to134965 8 ft feet -.29828.8 Vertical Change REF8829.8to134966 8 ft feet 5.0-6.0830.2 Cross Slope (Driveway)SF8831.2to $40 $3201458458ft feet .8832.1 Vertical Change REF8833.1to134967 8 ft $354,704.00TOTAL COST FOR:ALCOA AVEEside of Starting at:E SLAUSON AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 424 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name ALCOA AVE End Street Name 1912121305 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet 5.0-6.01.3 Cross Slope (PAR)SF82.4to $120 $9901461378ft feet 6.0-7.03.1 Cross Slope (PAR)SF144.9to $120 $1,6201461388ft feet 5.0-6.05.3 Cross Slope (PAR)SF3810.3to $120 $4,5001461398ft feet 3.0-4.010.8 Cross Slope (PAR)SF12827.9to $120 $15,3901461408ft feet 2.0-3.029.2 Cross Slope (PAR)SF4935.8to $120 $5,9401461418ft feet 4.0-5.035.8 Cross Slope (PAR)SF3240.0to $120 $3,7801461428ft feet 2.0-3.040.0 Cross Slope (PAR)SF6748.9to $120 $8,0101461438ft feet50.0 Driveway75.4to164995 feet 4.0-5.075.4 Cross Slope (Driveway)SF1978.0to $40 $7801461448ft feet 2.0-3.078.0 Cross Slope (PAR)SF9290.3to $120 $11,0701461458ft feet 2.0-3.092.9 Cross Slope (PAR)SF4799.2to $120 $5,6701461468ft feet 3.0-4.0101.3 Cross Slope (PAR)SF105115.3to $120 $12,6001461478ft feet 2.0-3.0115.3 Cross Slope (PAR)SF11116.8to $120 $1,3501461488ft feet118.2 Driveway171.3to164996 feet 3.16131.2 Vertical Change REF8132.2to135233 8 ft feet -.29152.1 Vertical Change REF8153.1to135234 8 ft feet 2.0-3.0173.6 Cross Slope (PAR)SF59181.4to $120 $7,0201461498ft feet 3.0-4.0183.7 Cross Slope (PAR)SF29187.6to $120 $3,5101461508ft feet 2.0-3.0187.6 Cross Slope (PAR)SF312229.2to $120 $37,4401461518ft feet 4.0-5.0230.1 Cross Slope (PAR)SF109244.6to $120 $13,0501461528ft feet244.6 Driveway296.6to164997 feet 3.0-4.0298.0 Cross Slope (PAR)SF74307.8to $120 $8,8201461538ft feet .31304.4 Vertical Change REF8305.4to135235 8 ft feet 3.0-4.0310.8 Cross Slope (PAR)SF23313.9to $120 $2,7901461548ft feet .5311.5 Vertical Change REF8312.5to135236 8 ft feet 2.0-3.0314.4 Cross Slope (PAR)SF45320.4to $120 $5,4001461558ft feet 4.0-5.0320.8 Cross Slope (PAR)SF370370.1to $120 $44,3701461568ft feet 2.0-3.0370.1 Cross Slope (PAR)SF74379.9to $120 $8,8201461578ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 425 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name ALCOA AVE End Street Name 1912121305 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet 3.0-4.0382.5 Cross Slope (PAR)SF17384.8to $120 $2,0701461588ft feet .26383.9 Vertical Change REF8384.9to135238 8 ft feet 4.0-5.0387.3 Cross Slope (PAR)SF19389.8to $120 $2,2501461598ft feet 2.0-3.0390.1 Cross Slope (PAR)SF44395.9to $120 $5,2201461608ft feet 2.0-3.0400.4 Cross Slope (PAR)SF38405.5to $120 $4,5901461618ft feet 3.0-4.0407.7 Cross Slope (PAR)SF26411.2to $120 $3,1501461628ft feet 2.0-3.0411.2 Cross Slope (PAR)SF148430.9to $120 $17,7301461638ft feet 4.0-5.0432.9 Cross Slope (PAR)SF329476.7to $120 $39,4201461648ft feet 2.0-3.0476.7 Cross Slope (PAR)SF104490.5to $120 $12,4201461658ft feet 4.0-5.0490.5 Cross Slope (PAR)SF121506.6to $120 $14,4901461668ft feet 3.48502.0 Vertical Change REF8503.0to135239 8 ft feet 2.0-3.0507.1 Cross Slope (PAR)SF133524.8to $120 $15,9301461678ft feet 4.0-5.0524.8 Cross Slope (PAR)SF72534.4to $120 $8,6401461688ft feet 2.0-3.0535.4 Cross Slope (PAR)SF78545.8to $120 $9,3601461698ft feet 4.0-5.0545.8 Cross Slope (PAR)SF26549.2to $120 $3,0601461708ft feet 2.0-3.0549.7 Cross Slope (PAR)SF52556.6to $120 $6,2101461718ft feet 4.0-5.0556.6 Cross Slope (PAR)SF58564.3to $120 $6,9301461728ft feet 5.0-6.0566.9 Cross Slope (PAR)SF10568.3to $120 $1,2601461738ft feet 3.0-4.0571.3 Cross Slope (PAR)SF126588.1to $120 $15,1201461748ft feet 2.67575.2 Vertical Change REF8576.2to135240 8 ft feet .37584.4 Vertical Change REF8585.4to135241 8 ft feet588.1 Driveway611.8to164998 feet -.37598.3 Vertical Change REF8599.3to135242 8 ft feet 2.0-3.0613.8 Cross Slope (PAR)SF68622.9to $120 $8,1901461758ft feet628.1 Driveway647.1to164999 feet 5.0-6.0648.8 Cross Slope (PAR)SF50655.4to $120 $5,9401461768ft feet -.37654.0 Vertical Change REF8655.0to135243 8 ft feet 3.0-4.0655.4 Cross Slope (PAR)SF11656.8to $120 $1,2601461778ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 426 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name ALCOA AVE End Street Name 1912121305 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet 2.0-3.0656.8 Cross Slope (PAR)SF8657.8to $120 $9001461788ft feet 2.0-3.0664.5 Cross Slope (PAR)SF33668.9to $120 $3,9601461798ft feet 4.0-5.0668.9 Cross Slope (PAR)SF50675.6to $120 $6,0301461808ft feet 2.0-3.0675.9 Cross Slope (PAR)SF234707.1to $120 $28,0801461818ft feet 4.0-5.0707.1 Cross Slope (PAR)SF96719.9to $120 $11,5201461828ft feet 2.0-3.0719.9 Cross Slope (PAR)SF176743.4to $120 $21,1501461838ft feet 2.0-3.0746.8 Cross Slope (PAR)SF237778.4to $120 $28,4401461848ft feet 2.0-3.0780.9 Cross Slope (PAR)SF14782.8to $120 $1,7101461858ft feet 3.0-4.0786.5 Cross Slope (PAR)SF32790.8to $120 $3,8701461868ft feet 2.0-3.0791.8 Cross Slope (PAR)SF118807.5to $120 $14,1301461878ft feet 4.0-5.0807.5 Cross Slope (PAR)SF53814.6to $120 $6,3901461888ft feet 4.0-5.0818.7 Cross Slope (PAR)SF143837.8to $120 $17,1901461898ft feet 4.0-5.0840.5 Cross Slope (PAR)SF80851.1to $120 $9,5401461908ft feet -.38851.8 Vertical Change LF8852.8to $75 $5631352448ft feet 2.0-3.0853.3 Cross Slope (PAR)SF36858.1to $120 $4,3201461918ft feet 4.0-5.0858.6 Cross Slope (PAR)SF60866.6to $120 $7,2001461928ft feet -.4865.4 Vertical Change REF8866.4to135245 8 ft feet 2.0-3.0868.7 Cross Slope (PAR)SF16870.8to $120 $1,8901461938ft feet 2.0-3.0875.3 Cross Slope (PAR)SF67884.2to $120 $8,0101461948ft feet 4.0-5.0884.3 Cross Slope (PAR)SF110899.0to $120 $13,2301461958ft feet 2.0-3.0899.4 Cross Slope (PAR)SF153919.8to $120 $18,3601461968ft feet 4.0-5.0919.8 Cross Slope (PAR)SF26923.3to $120 $3,1501461978ft feet 3.0-4.0926.8 Cross Slope (PAR)SF54934.0to $120 $6,4801461988ft feet 2.0-3.0934.0 Cross Slope (PAR)SF40939.3to $120 $4,7701461998ft feet 3.0-4.0941.8 Cross Slope (PAR)SF10943.1to $120 $1,1701462008ft feet 2.0-3.0943.1 Cross Slope (PAR)SF22946.0to $120 $2,6101462018ft feet 2.0-3.0949.8 Cross Slope (PAR)SF185974.5to $120 $22,2301462028ft feet 4.0-5.0975.2 Cross Slope (PAR)SF20977.8to $120 $2,3401462038ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 427 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E SLAUSON AVE Survey Street Name Starting Street Name ALCOA AVE End Street Name 1912121305 Run ID Alcoa Ave 94 ID Sidewalk Width Priority feet 2.0-3.0978.1 Cross Slope (PAR)SF35982.7to $120 $4,1401462048ft $639,532.50TOTAL COST FOR:ALCOA AVEWside of Starting at:E SLAUSON AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 428 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side E VERNON AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001141655 Run ID Alcoa Ave 33.25 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF364.8to $120 $4,3201528858ft feet 3.0-4.07.7 Cross Slope (PAR)SF14026.3to $120 $16,7401528868ft feet 2.0-3.026.8 Cross Slope (PAR)SF2630.2to $120 $3,0601528878ft feet 4.0-5.030.2 Cross Slope (PAR)SF831.2to $120 $9001528888ft feet 4.0-5.034.3 Cross Slope (PAR)SF2036.9to $120 $2,3401528898ft feet 2.0-3.037.8 Cross Slope (PAR)SF1139.3to $120 $1,3501528908ft feet 2.0-3.043.7 Cross Slope (PAR)SF844.8to $120 $9901528918ft feet 2.0-3.047.6 Cross Slope (PAR)SF1850.0to $120 $2,1601528928ft feet 2.0-3.052.3 Cross Slope (PAR)SF2054.9to $120 $2,3401528938ft feet 2.0-3.059.3 Cross Slope (PAR)SF3864.4to $120 $4,5901528948ft feet 2.0-3.077.9 Cross Slope (PAR)SF4283.5to $120 $5,0401528958ft feet 2.0-3.089.4 Cross Slope (PAR)SF2993.3to $120 $3,5101528968ft feet 2.0-3.0102.4 Cross Slope (PAR)SF67111.3to $120 $8,0101528978ft feet 3.0-4.0113.7 Cross Slope (PAR)SF53120.8to $120 $6,3901528988ft feet 2.0-3.0121.6 Cross Slope (PAR)SF43127.3to $120 $5,1301528998ft feet 2.0-3.0129.7 Cross Slope (PAR)SF18132.1to $120 $2,1601529008ft feet 2.0-3.0134.4 Cross Slope (PAR)SF395187.0to $120 $47,3401529018ft feet 2.0-3.0195.2 Cross Slope (PAR)SF41200.7to $120 $4,9501529028ft feet 7.0-8.0198.8 Running Slope REF8199.8to166486 8 ft $121,320.00TOTAL COST FOR:ALCOA AVEWside of Starting at:E VERNON AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 429 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name E 50TH ST End Street Name 1912161227 Run ID Alcoa Ave 91 ID Sidewalk Width Priority feet 2.0-3.01.3 Cross Slope (PAR)SF62.6to $120 $7021521945ft feet 5.0-6.04.1 Cross Slope (PAR)SF7520.8to $120 $9,0181521955ft feet 3.0-4.020.8 Cross Slope (PAR)SF2927.3to $120 $3,5101521965ft feet 5.0-6.027.3 Cross Slope (PAR)SF2933.8to $120 $3,5101521975ft feet -.2828.6 Vertical Change REF529.6to136967 5 ft feet -.2632.9 Vertical Change REF533.9to136968 5 ft feet 6.0-7.033.8 Cross Slope (PAR)SF3441.4to $120 $4,1041521985ft feet .2637.2 Vertical Change REF538.2to136969 5 ft feet -.2641.5 Vertical Change REF542.5to136970 5 ft feet 5.0-6.042.3 Cross Slope (PAR)SF5454.3to $120 $6,4801521995ft feet 6.0-7.054.3 Cross Slope (PAR)SF3562.1to $120 $4,2121522005ft feet59.1 Continuous Width SF560.1to $120 $5401671275ft feet 5.0-6.062.1 Cross Slope (PAR)SF563.3to $120 $6481522015ft feet62.9 Continuous Width SF563.9to $120 $5401674175ft feet 2.0-3.064.8 Cross Slope (PAR)SF565.9to $120 $5941522025ft feet 4.0-5.067.1 Cross Slope (PAR)SF1971.3to $120 $2,2681522035ft feet71.8 Driveway114.9to165543 feet .4372.1 Vertical Change REF573.1to136972 5 ft feet -.3884.9 Vertical Change REF585.9to136973 5 ft feet -.38114.9 Vertical Change REF5115.9to136974 5 ft feet 3.0-4.0115.8 Cross Slope (PAR)SF20120.3to $120 $2,4301522045ft feet 5.0-6.0120.3 Cross Slope (PAR)SF18124.4to $120 $2,2141522055ft feet 3.0-4.0124.4 Cross Slope (PAR)SF114149.8to $120 $13,7161522065ft feet127.2 Continuous Width SF4128.2to $120 $5401673965ft feet 5.0-6.0150.0 Cross Slope (PAR)SF15153.3to $120 $1,7821522075ft feet 3.0-4.0154.2 Cross Slope (PAR)SF107177.9to $120 $12,7981522085ft feet163.1 Continuous Width REF5164.1to167228 5 ft feet 2.0-3.0177.9 Cross Slope (PAR)SF67192.8to $120 $8,0461522095ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 430 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name E 50TH ST End Street Name 1912161227 Run ID Alcoa Ave 91 ID Sidewalk Width Priority feet185.3 Continuous Width REF5186.3to167725 5 ft feet 4.0-5.0193.0 Cross Slope (PAR)SF68208.2to $120 $8,2081522105ft feet 2.0-3.0208.2 Cross Slope (PAR)SF44218.0to $120 $5,2921522115ft feet .37215.3 Vertical Change REF5216.3to136975 5 ft feet 5.0-6.0219.3 Cross Slope (PAR)SF7220.8to $120 $8101522125ft feet 6.0-7.0220.8 Cross Slope (PAR)SF20225.2to $120 $2,3761522135ft feet .99221.1 Vertical Change REF5222.1to136976 5 ft feet 5.0-6.0225.3 Cross Slope (PAR)SF28231.5to $120 $3,3481522145ft feet -.38225.8 Vertical Change REF5226.8to136977 5 ft feet 3.0-4.0231.5 Cross Slope (PAR)SF8233.2to $120 $9181522155ft feet231.7 Continuous Width REF5232.7to167285 5 ft feet 2.0-3.0233.2 Cross Slope (PAR)SF17236.9to $120 $1,9981522165ft feet239.6 Cold Patch 41248.7to140469 5 ft feet .32243.6 Vertical Change LF5244.6to $75 $3381369785ft feet -.33245.9 Vertical Change LF23251.0to $75 $1,7211369795ft feet 4.0-5.0249.7 Cross Slope (PAR)SF50260.9to $120 $6,0481522175ft feet255.4 Continuous Width SF4256.4to $120 $5401668055ft feet 6.0-7.0260.9 Cross Slope (PAR)SF88280.5to $120 $10,5841522185ft feet .27265.8 Vertical Change REF5266.8to136980 5 ft feet -.31279.7 Vertical Change REF5280.7to136981 5 ft feet 5.0-6.0280.5 Cross Slope (PAR)SF40289.3to $120 $4,7521522195ft feet 3.0-4.0289.3 Cross Slope (PAR)SF112314.2to $120 $13,4461522205ft feet 5.0-6.0317.0 Cross Slope (PAR)SF24322.4to $120 $2,9161522215ft feet 3.0-4.0322.4 Cross Slope (PAR)SF18326.5to $120 $2,2141522225ft feet 5.0-6.0326.5 Cross Slope (PAR)SF74343.0to $120 $8,9101522235ft feet334.4 Continuous Width SF5335.4to $120 $5401675785ft feet 3.0-4.0343.0 Cross Slope (PAR)SF72359.1to $120 $8,6941522245ft feet 2.0-3.0359.1 Cross Slope (PAR)SF17362.8to $120 $1,9981522255ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 431 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name E 50TH ST End Street Name 1912161227 Run ID Alcoa Ave 91 ID Sidewalk Width Priority feet -.34363.1 Vertical Change LF5364.1to $75 $3381369825ft feet -.27367.6 Vertical Change REF5368.6to136983 5 ft feet 4.0-5.0367.8 Cross Slope (PAR)SF187409.3to $120 $22,4101522265ft feet 6.0-7.0409.3 Cross Slope (PAR)SF10411.5to $120 $1,1881522275ft feet 5.0-6.0411.5 Cross Slope (PAR)SF103434.3to $120 $12,3121522285ft feet -.27411.6 Vertical Change REF5412.6to136985 5 ft feet 6.0-7.0434.3 Cross Slope (PAR)SF18438.3to $120 $2,1601522295ft feet 5.0-6.0438.3 Cross Slope (PAR)SF66452.9to $120 $7,8841522305ft feet 3.0-4.0452.9 Cross Slope (PAR)SF51464.3to $120 $6,1561522315ft feet459.6 Continuous Width REF5460.6to166953 5 ft feet 5.0-6.0464.3 Cross Slope (PAR)SF17468.1to $120 $2,0521522325ft feet 3.0-4.0468.1 Cross Slope (PAR)SF16471.7to $120 $1,9441522335ft feet 5.0-6.0472.2 Cross Slope (PAR)SF29478.7to $120 $3,5101522345ft feet 3.0-4.0478.7 Cross Slope (PAR)SF19482.9to $120 $2,2681522355ft feet482.8 Continuous Width SF5483.8to $120 $5401674835ft feet 4.0-5.0485.7 Cross Slope (PAR)SF65500.1to $120 $7,7761522365ft feet497.6 Continuous Width SF5498.6to $120 $5401671625ft $234,380.25TOTAL COST FOR:ALCOA AVEEside of Starting at:FRUITLAND AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 432 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name 5563 ALCOA AVE End Street Name 1912121604 Run ID Alcoa Ave 81 ID Sidewalk Width Priority feet 5.0-6.00.0 Cross Slope (PAR)SF21227.3to $120 $25,3891456468ft feet -.283.8 Vertical Change REF84.8to134841 8 ft feet -.5210.8 Vertical Change REF811.8to134842 8 ft feet -.5217.9 Vertical Change REF818.9to134843 8 ft feet -.5324.7 Vertical Change REF825.7to134844 8 ft feet 3.0-4.028.8 Cross Slope (PAR)SF13245.8to $120 $15,8101456478ft feet -.2636.1 Vertical Change REF837.1to134845 8 ft feet -.3746.3 Vertical Change REF847.3to134846 8 ft feet 2.0-3.046.3 Cross Slope (PAR)SF947.4to $120 $1,0231456488ft feet .2950.7 Vertical Change LF851.7to $75 $5811348478ft feet 2.0-3.052.3 Cross Slope (PAR)SF2355.3to $120 $2,7901456498ft feet 4.0-5.055.3 Cross Slope (PAR)SF9467.4to $120 $11,2531456508ft feet -.5359.4 Vertical Change REF860.4to134848 8 ft feet 2.0-3.068.2 Cross Slope (PAR)SF5975.8to $120 $7,0681456518ft feet -.4168.8 Vertical Change REF869.8to134849 8 ft feet 4.0-5.075.8 Cross Slope (PAR)SF2779.3to $120 $3,2551456528ft feet -.3378.5 Vertical Change REF879.5to134850 8 ft feet 2.0-3.090.3 Cross Slope (PAR)SF78100.3to $120 $9,3001456538ft feet 4.0-5.0101.0 Cross Slope (PAR)SF105114.6to $120 $12,6481456548ft feet .56109.9 Vertical Change REF8110.9to134851 8 ft feet 2.0-3.0114.6 Cross Slope (PAR)SF184138.4to $120 $22,1341456558ft feet -.43124.7 Vertical Change REF8125.7to134852 8 ft feet -.4136.9 Vertical Change REF8137.9to134853 8 ft feet 2.0-3.0142.4 Cross Slope (PAR)SF70151.4to $120 $8,3701456568ft feet -.52143.5 Vertical Change REF8144.5to134854 8 ft feet .51152.2 Vertical Change SF8153.2to $75 $5811348558ft feet -.53156.5 Vertical Change SF8157.5to $75 $5811348568ft feet 2.0-3.0158.1 Cross Slope (PAR)SF90169.7to $120 $10,7881456578ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 433 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name 5563 ALCOA AVE End Street Name 1912121604 Run ID Alcoa Ave 81 ID Sidewalk Width Priority feet 3.0-4.0171.8 Cross Slope (PAR)SF60179.6to $120 $7,2541456588ft feet 2.0-3.0179.6 Cross Slope (PAR)SF40184.8to $120 $4,8361456598ft feet .31184.1 Vertical Change REF8185.1to134857 8 ft feet 2.0-3.0191.2 Cross Slope (PAR)SF86202.3to $120 $10,3231456608ft feet -.38196.6 Vertical Change REF8197.6to134858 8 ft feet 2.0-3.0208.0 Cross Slope (PAR)SF60215.7to $120 $7,1611456618ft feet -.35210.1 Vertical Change REF8211.1to134859 8 ft feet215.7 Driveway259.3to164949 feet -.32225.7 Vertical Change REF8226.7to134860 8 ft feet .46247.4 Vertical Change REF8248.4to134861 8 ft feet 4.0-5.0260.1 Cross Slope (PAR)SF192284.9to $120 $23,0641456628ft feet -.38266.5 Vertical Change REF8267.5to134862 8 ft feet286.3 Driveway331.1to164950 feet -.36319.2 Vertical Change REF8320.2to134863 8 ft feet -.36329.5 Vertical Change REF8330.5to134864 8 ft feet 3.0-4.0331.1 Cross Slope (Driveway)SF79341.3to $40 $3,1621456638ft feet .79342.6 Vertical Change REF8343.6to134865 8 ft feet 5.0-6.0342.8 Cross Slope (PAR)SF10344.1to $120 $1,2091456648ft feet 7.0-8.0346.5 Cross Slope (PAR)SF13348.2to $120 $1,5811456658ft feet 2.0-3.0353.5 Cross Slope (PAR)SF379402.4to $120 $45,4771456668ft feet 4.0-5.0402.4 Cross Slope (PAR)SF33406.7to $120 $3,9991456678ft feet 2.0-3.0406.7 Cross Slope (PAR)SF239437.5to $120 $28,6441456688ft feet 2.0-3.0440.8 Cross Slope (PAR)SF53447.6to $120 $6,3241456698ft feet 4.0-5.0447.6 Cross Slope (PAR)SF447505.3to $120 $53,6611456708ft feet .31448.4 Vertical Change REF8449.4to134866 8 ft feet 2.0-3.0505.3 Cross Slope (PAR)SF67513.9to $120 $7,9981456718ft feet 4.0-5.0514.3 Cross Slope (PAR)SF253546.9to $120 $30,3181456728ft feet .72539.6 Vertical Change REF8540.6to134867 8 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 434 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name 5563 ALCOA AVE End Street Name 1912121604 Run ID Alcoa Ave 81 ID Sidewalk Width Priority feet 2.0-3.0547.3 Cross Slope (PAR)SF40552.4to $120 $4,7431456738ft feet 4.0-5.0552.4 Cross Slope (PAR)SF198577.9to $120 $23,7151456748ft feet580.0 Driveway613.4to164951 feet 2.0-3.0613.8 Cross Slope (PAR)SF89625.3to $120 $10,6951456758ft feet -.26622.3 Vertical Change REF8623.3to134869 8 ft feet626.3 Driveway669.4to164952 feet -.39635.8 Vertical Change REF8636.8to134870 8 ft feet -.26646.6 Vertical Change REF8647.6to134871 8 ft feet .32657.6 Vertical Change REF8658.6to134872 8 ft feet 3.0-4.0670.7 Cross Slope (PAR)SF166692.1to $120 $19,9021456768ft feet .31678.7 Vertical Change REF8679.7to134873 8 ft feet 2.0-3.0692.1 Cross Slope (PAR)SF133709.3to $120 $15,9961456778ft feet .39696.9 Vertical Change REF8697.9to134874 8 ft feet -.7713.5 Vertical Change REF8714.5to134875 8 ft feet 5.0-6.0714.3 Cross Slope (PAR)SF12715.9to $120 $1,4881456788ft feet 5.0-6.0718.5 Cross Slope (PAR)SF78728.5to $120 $9,3001456798ft feet 4.0-5.0732.4 Cross Slope (PAR)SF19734.9to $120 $2,3251456808ft feet 3.0-4.0737.9 Cross Slope (PAR)SF139755.8to $120 $16,6471456818ft feet 5.0-6.0755.8 Cross Slope (PAR)SF33760.1to $120 $3,9991456828ft feet 3.0-4.0760.6 Cross Slope (PAR)SF368808.1to $120 $44,1751456838ft feet 5.0-6.0808.8 Cross Slope (PAR)SF84819.7to $120 $10,1371456848ft feet 6.0-7.0820.1 Cross Slope (PAR)SF13821.8to $120 $1,5811456858ft feet -.31821.4 Vertical Change REF8822.4to134876 8 ft feet 5.0-6.0821.8 Cross Slope (PAR)SF127838.2to $120 $15,2521456868ft feet 3.0-4.0838.5 Cross Slope (PAR)SF42843.9to $120 $5,0221456878ft feet 5.0-6.0845.3 Cross Slope (PAR)SF29849.0to $120 $3,4411456888ft feet 3.0-4.0849.5 Cross Slope (PAR)SF82860.1to $120 $9,8581456898ft feet 5.0-6.0860.1 Cross Slope (PAR)SF25863.3to $120 $2,9761456908ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 435 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name 5563 ALCOA AVE End Street Name 1912121604 Run ID Alcoa Ave 81 ID Sidewalk Width Priority feet 3.0-4.0864.8 Cross Slope (PAR)SF74874.3to $120 $8,8351456918ft feet 5.0-6.0875.4 Cross Slope (PAR)SF187899.5to $120 $22,4131456928ft feet 4.0-5.0901.8 Cross Slope (PAR)SF47907.8to $120 $5,5801456938ft feet 2.0-3.0907.8 Cross Slope (PAR)SF115922.6to $120 $13,7641456948ft feet -.29916.4 Vertical Change REF8917.4to134877 8 ft feet 4.0-5.0922.6 Cross Slope (PAR)SF270957.5to $120 $32,4571456958ft feet -.5933.6 Vertical Change REF8934.6to134878 8 ft feet 2.0-3.0958.1 Cross Slope (PAR)SF140976.2to $120 $16,8331456968ft feet .27959.1 Vertical Change REF8960.1to134879 8 ft feet976.2 Driveway1010.1to164953 feet -.34997.7 Vertical Change REF8998.7to134880 8 ft feet 3.0-4.01011.4 Cross Slope (PAR)SF881022.8to $120 $10,6021456978ft feet 2.0-3.01022.8 Cross Slope (PAR)SF131024.5to $120 $1,5811456988ft feet1025.0 Driveway1068.8to164954 feet -.371042.9 Vertical Change REF81043.9to134881 8 ft feet 4.0-5.01068.8 Cross Slope (Driveway)SF731078.2to $40 $2,9141456998ft $682,813.75TOTAL COST FOR:ALCOA AVEWside of Starting at:FRUITLAND AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 436 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side LEONIS BLVD Survey Street Name Starting Street Name E 46TH ST End Street Name 1912201215 Run ID Alcoa Ave 69 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF479.8to $120 $5,5861474195ft feet4.9 Continuous Width SF55.9to $120 $5701669925ft feet 2.0-3.09.8 Cross Slope (PAR)SF711.3to $120 $8551474205ft feet 2.0-3.015.7 Cross Slope (PAR)SF2921.9to $120 $3,5341474215ft feet -.2924.0 Vertical Change LF525.0to $75 $3561357165ft feet 2.0-3.030.3 Cross Slope (PAR)SF2234.9to $120 $2,6221474225ft feet31.2 Continuous Width REF532.2to166937 5 ft feet43.3 Continuous Width SF544.3to $120 $5701671115ft feet 2.0-3.043.8 Cross Slope (PAR)SF7459.3to $120 $8,8351474235ft feet50.7 Continuous Width REF551.7to167294 5 ft feet52.8 Continuous Width REF553.8to167676 5 ft feet 2.0-3.061.5 Cross Slope (PAR)SF763.0to $120 $8551474245ft feet 2.0-3.066.8 Cross Slope (PAR)SF10388.5to $120 $12,3691474255ft feet 2.0-3.090.8 Cross Slope (PAR)SF1493.8to $120 $1,7101474265ft feet102.8 Continuous Width SF5103.8to $120 $5701671125ft feet 3.0-4.0104.4 Cross Slope (PAR)SF28110.3to $120 $3,3631474275ft feet 2.0-3.0111.5 Cross Slope (PAR)SF22116.1to $120 $2,6221474285ft feet 2.0-3.0120.3 Cross Slope (PAR)SF59132.7to $120 $7,0681474295ft feet .32132.5 Vertical Change REF5133.5to135717 5 ft feet133.3 Driveway161.3to165115 feet 2.0-3.0162.4 Cross Slope (PAR)SF8164.0to $120 $9121474305ft feet 6.0-7.0169.3 Cross Slope (PAR)SF11171.6to $120 $1,3111474315ft feet 5.0-6.0171.6 Cross Slope (PAR)SF10173.6to $120 $1,1401474325ft feet172.3 Continuous Width SF5173.3to $120 $5701674075ft feet 6.0-7.0173.6 Cross Slope (PAR)SF27179.3to $120 $3,2491474335ft feet 5.0-6.0180.1 Cross Slope (PAR)SF13182.8to $120 $1,5391474345ft feet 3.0-4.0182.8 Cross Slope (PAR)SF6184.1to $120 $7411474355ft feet .29184.2 Vertical Change LF5185.2to $75 $3561357185ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 437 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side LEONIS BLVD Survey Street Name Starting Street Name E 46TH ST End Street Name 1912201215 Run ID Alcoa Ave 69 ID Sidewalk Width Priority feet184.6 Driveway221.9to165116 feet 2.0-3.0222.2 Cross Slope (Driveway)SF14225.2to $40 $5701474365ft feet 4.0-5.0225.2 Cross Slope (PAR)SF22229.8to $120 $2,6221474375ft feet 2.0-3.0229.8 Cross Slope (PAR)SF31236.4to $120 $3,7621474385ft feet230.8 Continuous Width SF5231.8to $120 $5701667945ft feet 2.0-3.0246.6 Cross Slope (PAR)SF15249.8to $120 $1,8241474395ft feet 2.0-3.0251.9 Cross Slope (PAR)SF29258.0to $120 $3,4771474405ft feet 3.0-4.0261.8 Cross Slope (PAR)SF221308.3to $120 $26,5051474415ft feet298.8 Continuous Width SF5299.8to $120 $5701664125ft feet 5.0-6.0308.3 Cross Slope (PAR)SF211352.7to $120 $25,3081474425ft feet313.4 Continuous Width SF5314.4to $120 $5701669085ft feet330.2 Continuous Width SF5331.2to $120 $5701674365ft feet332.4 Continuous Width SF5333.4to $120 $5701664145ft feet 1.19336.3 Vertical Change REF5337.3to135719 5 ft feet348.8 Continuous Width SF5349.8to $120 $5701664135ft feet 3.0-4.0352.7 Cross Slope (PAR)SF39360.9to $120 $4,6741474435ft feet 2.0-3.0362.3 Cross Slope (PAR)SF27367.9to $120 $3,1921474445ft feet 4.0-5.0367.9 Cross Slope (PAR)SF228415.8to $120 $27,3031474455ft feet 2.0-3.0415.8 Cross Slope (PAR)SF78432.2to $120 $9,3481474465ft feet421.8 Continuous Width SF5422.8to $120 $5701667935ft feet 4.0-5.0432.2 Cross Slope (PAR)SF9434.0to $120 $1,0261474475ft feet 2.0-3.0436.3 Cross Slope (PAR)SF37444.1to $120 $4,4461474485ft feet 4.0-5.0444.1 Cross Slope (PAR)SF72459.3to $120 $8,6641474495ft feet448.3 Continuous Width SF5449.3to $120 $5701664115ft feet 2.0-3.0460.6 Cross Slope (PAR)SF51471.3to $120 $6,0991474505ft feet 2.0-3.0478.9 Cross Slope (PAR)SF16482.3to $120 $1,9381474515ft feet 6.0-7.0485.3 Cross Slope (PAR)SF15488.4to $120 $1,7671474525ft feet489.3 Continuous Width SF5490.3to $120 $5701673555ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 438 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side LEONIS BLVD Survey Street Name Starting Street Name E 46TH ST End Street Name 1912201215 Run ID Alcoa Ave 69 ID Sidewalk Width Priority feet 5.0-6.0489.9 Cross Slope (PAR)SF20494.1to $120 $2,3941474535ft feet493.6 Continuous Width REF5494.6to166847 5 ft feet 3.0-4.0494.1 Cross Slope (PAR)SF11496.5to $120 $1,3681474545ft feet 2.0-3.0496.8 Cross Slope (PAR)SF6498.0to $120 $6841474555ft feet .33500.0 Vertical Change LF5501.0to $75 $3561357205ft feet500.6 Continuous Width SF5501.6to $120 $5701671535ft feet 2.0-3.0503.4 Cross Slope (PAR)SF47513.3to $120 $5,6431474565ft $209,973.75TOTAL COST FOR:ALCOA AVEEside of Starting at:LEONIS BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 439 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side LEONIS BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001141526 Run ID Alcoa Ave 89 ID Sidewalk Width Priority feet 5.0-6.05.0 Cross Slope (PAR)SF5316.8to $120 $6,3721532915ft feet13.0 Continuous Width SF514.0to $120 $5401669935ft feet 3.0-4.018.2 Cross Slope (PAR)SF819.9to $120 $9181532925ft feet 5.0-6.021.8 Cross Slope (PAR)SF522.9to $120 $5941532935ft feet 6.0-7.022.9 Cross Slope (PAR)SF624.2to $120 $7021532945ft feet 5.0-6.024.2 Cross Slope (PAR)SF2329.2to $120 $2,7001532955ft feet -.4730.0 Vertical Change LF531.0to $75 $3381372345ft feet 3.0-4.031.3 Cross Slope (PAR)SF5242.8to $120 $6,2101532965ft feet37.6 Continuous Width SF538.6to $120 $5401673755ft feet 4.0-5.045.3 Cross Slope (PAR)SF1348.1to $120 $1,5121532975ft feet 6.0-7.048.3 Cross Slope (PAR)SF950.2to $120 $1,0261532985ft feet 5.0-6.050.7 Cross Slope (PAR)SF952.8to $120 $1,1341532995ft feet 6.0-7.053.4 Cross Slope (PAR)SF1456.6to $120 $1,7281533005ft feet 5.0-6.056.9 Cross Slope (PAR)SF12283.9to $120 $14,5801533015ft feet77.6 Continuous Width SF578.6to $120 $5401671665ft feet 6.0-7.084.3 Cross Slope (PAR)SF886.0to $120 $9181533025ft feet 185.7 Vertical Change REF586.7to137235 5 ft feet 5.0-6.086.3 Cross Slope (PAR)SF2792.4to $120 $3,2941533035ft feet 3.0-4.092.4 Cross Slope (PAR)SF894.1to $120 $9181533045ft feet 4.0-5.096.3 Cross Slope (PAR)SF91116.5to $120 $10,9081533055ft feet 2.0-3.0117.8 Cross Slope (PAR)SF36125.8to $120 $4,3201533065ft feet 4.0-5.0126.3 Cross Slope (PAR)SF9128.2to $120 $1,0261533075ft feet 4.0-5.0135.3 Cross Slope (PAR)SF16138.8to $120 $1,8901533085ft feet136.3 Continuous Width SF5137.3to $120 $5401673805ft feet139.3 Driveway156.2to165611 $63,247.50TOTAL COST FOR:ALCOA AVEEside of Starting at:LEONIS BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 440 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side LEONIS BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912200934 Run ID Alcoa Ave 55 ID Sidewalk Width Priority feet 3.0-4.00.5 Cross Slope (PAR)SF10013.4to $120 $11,9971479878ft feet 2.0-3.015.8 Cross Slope (PAR)SF1918.2to $120 $2,2321479888ft feet20.5 Driveway72.3to165175 feet 2.0-3.073.3 Cross Slope (PAR)SF4779.4to $120 $5,6731479898ft feet 2.0-3.086.4 Cross Slope (PAR)SF5293.1to $120 $6,2311479908ft feet93.1 Driveway105.8to165176 $26,133.00TOTAL COST FOR:ALCOA AVEWside of Starting at:LEONIS BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 441 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name 5232 ALCOA AVE End Street Name 1912121539 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet 2.0-3.02.8 Cross Slope (PAR)SF54.0to $120 $6481457335ft feet4.3 Driveway49.9to164959 feet -.2826.8 Vertical Change REF527.8to134902 5 ft feet 2.0-3.053.3 Cross Slope (PAR)SF4863.9to $120 $5,7241457345ft feet 2.0-3.066.6 Cross Slope (PAR)SF7182.3to $120 $8,4781457355ft feet .2667.9 Vertical Change REF568.9to134904 5 ft feet .4172.8 Vertical Change REF573.8to134905 5 ft feet 4.0-5.082.3 Cross Slope (PAR)SF6195.8to $120 $7,2901457365ft feet 2.0-3.096.9 Cross Slope (PAR)SF798.4to $120 $8101457375ft feet 2.0-3.0114.0 Cross Slope (PAR)SF105137.4to $120 $12,6361457385ft feet 3.0-4.0139.7 Cross Slope (PAR)SF5140.8to $120 $5941457395ft feet .47142.8 Vertical Change LF5143.8to $75 $3381349065ft feet 4.0-5.0151.1 Cross Slope (PAR)SF10153.3to $120 $1,1881457405ft feet 1.01152.7 Vertical Change REF5153.7to134907 5 ft feet153.3 Driveway171.5to164960 feet .72155.2 Vertical Change REF12157.9to134908 5 ft feet .41159.9 Vertical Change REF12162.6to134909 5 ft feet .86163.3 Vertical Change REF4164.3to134910 5 ft feet 5.0-6.0171.9 Cross Slope (Driveway)SF17175.6to $40 $6661457415ft feet 3.63172.1 Vertical Change REF5173.1to134911 5 ft feet 3.0-4.0175.6 Cross Slope (PAR)SF72191.5to $120 $8,5861457425ft feet 2.0-3.0194.3 Cross Slope (PAR)SF38202.8to $120 $4,5901457435ft feet .28196.6 Vertical Change REF5197.6to134913 5 ft feet 2.0-3.0208.7 Cross Slope (PAR)SF64222.9to $120 $7,6681457445ft feet .33208.9 Vertical Change REF5209.9to134914 5 ft feet 4.0-5.0222.9 Cross Slope (PAR)SF5223.9to $120 $5401457455ft feet 3.0-4.0226.0 Cross Slope (PAR)SF5227.0to $120 $5401457465ft feet 2.0-3.0227.0 Cross Slope (PAR)SF5228.2to $120 $6481457475ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 442 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name 5232 ALCOA AVE End Street Name 1912121539 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet 3.0-4.0230.7 Cross Slope (PAR)SF14233.8to $120 $1,6741457485ft feet 2.0-3.0234.2 Cross Slope (PAR)SF67249.0to $120 $7,9921457495ft feet 4.0-5.0249.8 Cross Slope (PAR)SF9251.9to $120 $1,1341457505ft feet 4.0-5.0254.1 Cross Slope (PAR)SF35261.8to $120 $4,1581457515ft feet -.3258.1 Vertical Change REF5259.1to134915 5 ft feet267.1 Driveway295.2to164961 feet 3.0-4.0295.2 Cross Slope (Driveway)SF92315.6to $40 $3,6721457525ft feet -.38310.0 Vertical Change REF5311.0to134916 5 ft feet 2.0-3.0315.9 Cross Slope (PAR)SF22320.8to $120 $2,6461457535ft feet320.8 Driveway348.1to164962 feet 2.0-3.0348.8 Cross Slope (PAR)SF7350.3to $120 $8101457545ft feet 2.0-3.0354.9 Cross Slope (PAR)SF14358.0to $120 $1,6741457555ft feet 4.0-5.0358.0 Cross Slope (PAR)SF126385.9to $120 $15,0661457565ft feet 2.0-3.0387.3 Cross Slope (PAR)SF6388.6to $120 $7021457575ft feet -.32389.6 Vertical Change LF5390.6to $75 $3381349175ft feet 2.0-3.0391.3 Cross Slope (PAR)SF10393.5to $120 $1,1881457585ft feet394.5 Driveway428.9to164963 feet -.27428.3 Vertical Change REF5429.3to134918 5 ft feet 4.0-5.0430.2 Cross Slope (PAR)SF17434.0to $120 $2,0521457595ft feet 2.0-3.0434.0 Cross Slope (PAR)SF18438.0to $120 $2,1601457605ft feet 3.0-4.0441.3 Cross Slope (PAR)SF108465.2to $120 $12,9061457615ft feet -.31452.0 Vertical Change REF5453.0to134919 5 ft feet 2.0-3.0466.0 Cross Slope (PAR)SF61479.5to $120 $7,2901457625ft feet481.7 Driveway521.2to164964 feet -.27481.9 Vertical Change REF5482.9to134920 5 ft feet .42498.5 Vertical Change REF5499.5to134921 5 ft feet519.4 Continuous Width SF5520.4to $120 $5401675715ft feet 4.0-5.0521.2 Cross Slope (Driveway)SF14524.2to $40 $5401457635ft feet 2.0-3.0525.9 Cross Slope (PAR)SF48536.5to $120 $5,7241457645ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 443 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name 5232 ALCOA AVE End Street Name 1912121539 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet 4.0-5.0537.0 Cross Slope (PAR)SF62550.7to $120 $7,3981457655ft feet 2.0-3.0550.7 Cross Slope (PAR)SF19554.9to $120 $2,2681457665ft feet 4.0-5.0554.9 Cross Slope (PAR)SF7556.4to $120 $8101457675ft feet 3.0-4.0559.1 Cross Slope (PAR)SF26564.9to $120 $3,1321457685ft feet 4.0-5.0567.8 Cross Slope (PAR)SF67582.6to $120 $7,9921457695ft feet 2.0-3.0585.6 Cross Slope (PAR)SF33592.9to $120 $3,9421457705ft feet 4.0-5.0593.5 Cross Slope (PAR)SF29599.9to $120 $3,4561457715ft feet 3.0-4.0602.8 Cross Slope (PAR)SF76619.7to $120 $9,1261457725ft feet604.9 Continuous Width SF5605.9to $120 $5401668375ft feet619.7 Driveway650.8to164965 feet -.26632.7 Vertical Change REF5633.7to134922 5 ft feet .29640.3 Vertical Change REF5641.3to134923 5 ft feet .95643.4 Vertical Change REF5644.4to134924 5 ft feet .31650.1 Vertical Change REF5651.1to134925 5 ft feet 6.0-7.0651.0 Cross Slope (Driveway)SF5652.1to $40 $1981457735ft feet -.28653.1 Vertical Change LF5654.1to $75 $3381349265ft feet .33654.9 Vertical Change LF5655.9to $75 $3381349275ft feet 3.0-4.0658.0 Cross Slope (PAR)SF5659.0to $120 $5401457745ft feet 2.0-3.0659.0 Cross Slope (PAR)SF23664.2to $120 $2,8081457755ft feet 3.0-4.0668.4 Cross Slope (PAR)SF11670.9to $120 $1,3501457765ft feet 2.0-3.0673.0 Cross Slope (PAR)SF7674.5to $120 $8101457775ft feet 4.0-5.0675.5 Cross Slope (PAR)SF8677.2to $120 $9181457785ft feet678.5 Driveway717.2to164966 feet 4.0-5.0717.2 Cross Slope (Driveway)SF78734.6to $40 $3,1321457795ft feet 5.0-6.0738.9 Cross Slope (PAR)SF19743.1to $120 $2,2681457805ft feet -.27742.8 Vertical Change REF5743.8to134928 5 ft feet743.1 Driveway767.2to164967 feet 5.0-6.0768.3 Cross Slope (PAR)SF5769.4to $120 $5941457815ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 444 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name 5232 ALCOA AVE End Street Name 1912121539 Run ID Alcoa Ave 92 ID Sidewalk Width Priority feet 6.0-7.0769.4 Cross Slope (PAR)SF10771.6to $120 $1,1881457825ft feet 2.0-3.0772.9 Cross Slope (PAR)SF9775.0to $120 $1,1341457835ft feet 2.0-3.0784.6 Cross Slope (PAR)SF24789.9to $120 $2,8621457845ft feet -.38792.0 Vertical Change REF5793.0to134929 5 ft feet 4.0-5.0792.3 Cross Slope (PAR)SF68807.3to $120 $8,1001457855ft feet 6.0-7.0807.3 Cross Slope (PAR)SF18811.2to $120 $2,1061457865ft feet 5.0-6.0812.2 Cross Slope (PAR)SF16815.7to $120 $1,8901457875ft feet 3.0-4.0815.7 Cross Slope (PAR)SF30822.3to $120 $3,5641457885ft feet 5.0-6.0823.1 Cross Slope (PAR)SF51834.4to $120 $6,1021457895ft feet835.1 Driveway853.0to164968 feet 6.0-7.0853.0 Cross Slope (Driveway)SF8854.8to $40 $3241457905ft feet 5.0-6.0855.2 Cross Slope (PAR)SF15858.5to $120 $1,7821457915ft feet858.5 Driveway881.3to164969 feet 2.0-3.0881.4 Cross Slope (Driveway)SF6882.7to $40 $2341457925ft feet .28883.3 Vertical Change LF5884.3to $75 $3381349305ft feet .41893.9 Vertical Change LF5894.9to $75 $3381349315ft feet 2.0-3.0903.9 Cross Slope (PAR)SF16907.4to $120 $1,8901457935ft feet 2.0-3.0909.6 Cross Slope (PAR)SF18913.5to $120 $2,1061457945ft feet -.26919.7 Vertical Change REF5920.7to134932 5 ft feet 2.0-3.0920.4 Cross Slope (PAR)SF27926.3to $120 $3,1861457955ft feet 4.0-5.0926.3 Cross Slope (PAR)SF62940.1to $120 $7,4521457965ft feet -.34934.2 Vertical Change LF5935.2to $75 $3381349335ft feet942.8 Driveway965.8to164970 feet -.41956.2 Vertical Change REF5957.2to134934 5 ft feet 2.0-3.0967.2 Cross Slope (PAR)SF5968.3to $120 $5941457975ft feet .29968.0 Vertical Change REF5969.0to134935 5 ft $230,692.50TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 445 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name LEONIS BLVD End Street Name 1912200956 Run ID Alcoa Ave 71 ID Sidewalk Width Priority feet 2.0-3.03.8 Cross Slope (PAR)SF4513.2to $120 $5,3581479425ft feet10.0 Continuous Width SF511.0to $120 $5701674085ft feet 4.0-5.013.2 Cross Slope (PAR)SF1917.2to $120 $2,2801479435ft feet 2.0-3.017.2 Cross Slope (PAR)SF2522.4to $120 $2,9641479445ft feet 2.0-3.030.6 Cross Slope (PAR)SF3638.1to $120 $4,2751479455ft feet 3.4932.5 Vertical Change REF533.5to135854 5 ft feet 4.0-5.038.1 Cross Slope (PAR)SF329107.3to $120 $39,4441479465ft feet 2.0-3.0107.6 Cross Slope (PAR)SF47117.4to $120 $5,5861479475ft feet117.1 Continuous Width REF5118.1to167677 5 ft feet118.0 Continuous Width SF5119.0to $120 $5701669975ft $61,047.00TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 446 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 44TH ST End Street Name 2001141537 Run ID Alcoa Ave 93.5 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF628.3to $120 $7,4701532258ft feet -.32.1 Vertical Change REF83.1to137214 8 ft feet 2.0-3.012.6 Cross Slope (PAR)SF1314.3to $120 $1,5301532268ft feet14.3 Driveway62.3to165605 feet -.3320.7 Vertical Change REF821.7to137215 8 ft feet .2829.3 Vertical Change REF830.3to137216 8 ft feet 2.0-3.067.9 Cross Slope (PAR)SF8979.8to $120 $10,7101532278ft feet .584.6 Vertical Change SF885.6to $75 $5631372188ft feet 2.0-3.089.8 Cross Slope (PAR)SF890.8to $120 $9001532288ft feet 2.0-3.095.4 Cross Slope (PAR)SF127112.3to $120 $15,2101532298ft feet 2.0-3.0116.6 Cross Slope (PAR)SF32120.8to $120 $3,7801532308ft feet 2.0-3.0124.8 Cross Slope (PAR)SF14126.6to $120 $1,6201532318ft feet 2.0-3.0137.1 Cross Slope (PAR)SF17139.3to $120 $1,9801532328ft feet 2.0-3.0142.3 Cross Slope (PAR)SF26145.8to $120 $3,1501532338ft feet 2.0-3.0150.3 Cross Slope (PAR)SF8151.4to $120 $9901532348ft feet .27155.0 Vertical Change LF8156.0to $75 $5631372198ft feet 2.0-3.0158.8 Cross Slope (PAR)SF13160.5to $120 $1,5301532358ft feet .67159.5 Vertical Change REF8160.5to137220 8 ft feet 2.0-3.0170.7 Cross Slope (PAR)SF26174.2to $120 $3,1501532368ft feet .3179.6 Vertical Change LF8180.6to $75 $5631372218ft feet 2.0-3.0191.7 Cross Slope (PAR)SF31195.8to $120 $3,6901532378ft feet 2.0-3.0199.3 Cross Slope (PAR)SF43205.0to $120 $5,1301532388ft feet 2.0-3.0210.0 Cross Slope (PAR)SF40215.3to $120 $4,7701532398ft feet 4.0-5.0215.3 Cross Slope (PAR)SF100228.6to $120 $11,9701532408ft feet228.3 Continuous Width REF8229.3to167229 8 ft feet 2.0-3.0233.1 Cross Slope (PAR)SF8234.1to $120 $9001532418ft feet 4.0-5.0234.8 Cross Slope (PAR)SF10236.1to $120 $1,1701532428ft feet238.6 Continuous Width SF8239.6to $120 $9001674188ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 447 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 44TH ST End Street Name 2001141537 Run ID Alcoa Ave 93.5 ID Sidewalk Width Priority feet 5.0-6.0240.3 Cross Slope (PAR)SF19242.8to $120 $2,2501532438ft feet 3.0-4.0242.8 Cross Slope (PAR)SF47249.0to $120 $5,5801532448ft feet 2.0-3.0249.8 Cross Slope (PAR)SF9251.0to $120 $1,0801532458ft feet 3.0-4.0253.4 Cross Slope (PAR)SF34257.9to $120 $4,0501532468ft feet 4.0-5.0260.8 Cross Slope (PAR)SF8261.9to $120 $9901532478ft feet266.1 Driveway295.2to165606 feet .39266.2 Vertical Change REF8267.2to137222 8 ft feet .34289.0 Vertical Change REF8290.0to137223 8 ft feet 1.2292.4 Vertical Change REF8293.4to137224 8 ft feet 2.0-3.0296.7 Cross Slope (PAR)SF8297.8to $120 $9901532488ft feet 3.0-4.0301.8 Cross Slope (PAR)SF34306.4to $120 $4,1401532498ft feet307.7 Driveway334.0to165607 feet 3.0-4.0334.1 Cross Slope (Driveway)SF53341.1to $40 $2,1001532508ft feet 2.0-3.0341.9 Cross Slope (PAR)SF194367.8to $120 $23,3101532518ft feet359.9 Continuous Width REF8360.9to167183 8 ft feet 1.36362.6 Vertical Change REF8363.6to137225 8 ft feet364.9 Continuous Width SF8365.9to $120 $9001674198ft feet .27367.6 Vertical Change REF8368.6to137226 8 ft feet369.3 Driveway424.3to165608 feet -.26375.0 Vertical Change REF8376.0to137227 8 ft feet 3.0-4.0425.1 Cross Slope (PAR)SF8426.2to $120 $9901532528ft feet 2.0-3.0427.6 Cross Slope (PAR)SF28431.3to $120 $3,3301532538ft feet 2.0-3.0435.8 Cross Slope (PAR)SF138454.2to $120 $16,5601532548ft feet .3455.0 Vertical Change LF8456.0to $75 $5631372288ft feet 2.0-3.0456.3 Cross Slope (PAR)SF230486.9to $120 $27,5401532558ft feet .27461.9 Vertical Change REF8462.9to137229 8 ft feet .3466.2 Vertical Change REF8467.2to137230 8 ft feet 2.0-3.0491.0 Cross Slope (PAR)SF8492.0to $120 $9001532568ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 448 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 44TH ST End Street Name 2001141537 Run ID Alcoa Ave 93.5 ID Sidewalk Width Priority feet 3.0-4.0495.3 Cross Slope (PAR)SF23498.3to $120 $2,7001532578ft feet 2.0-3.0499.3 Cross Slope (PAR)SF14501.1to $120 $1,6201532588ft feet 2.0-3.0507.7 Cross Slope (PAR)SF56515.2to $120 $6,7501532598ft feet 2.0-3.0526.3 Cross Slope (PAR)SF74536.2to $120 $8,9101532608ft feet -.27536.1 Vertical Change REF8537.1to137231 8 ft feet 4.0-5.0536.2 Cross Slope (PAR)SF49542.7to $120 $5,8501532618ft feet 6.0-7.0542.8 Cross Slope (PAR)SF13544.5to $120 $1,5301532628ft feet 5.0-6.0544.5 Cross Slope (PAR)SF23547.5to $120 $2,7001532638ft feet 3.0-4.0548.3 Cross Slope (PAR)SF21551.1to $120 $2,5201532648ft feet 2.0-3.0551.1 Cross Slope (PAR)SF89562.9to $120 $10,6201532658ft feet 4.0-5.0563.5 Cross Slope (PAR)SF17565.7to $120 $1,9801532668ft feet 2.0-3.0566.6 Cross Slope (PAR)SF88578.3to $120 $10,5301532678ft feet 2.0-3.0582.4 Cross Slope (PAR)SF22585.3to $120 $2,6101532688ft feet 2.0-3.0589.2 Cross Slope (PAR)SF17591.5to $120 $2,0701532698ft feet 2.0-3.0597.3 Cross Slope (PAR)SF26600.8to $120 $3,1501532708ft feet 2.0-3.0617.0 Cross Slope (PAR)SF93629.4to $120 $11,1601532718ft feet 4.0-5.0629.4 Cross Slope (PAR)SF75639.4to $120 $9,0001532728ft feet 2.0-3.0641.1 Cross Slope (PAR)SF65649.8to $120 $7,8301532738ft feet 4.0-5.0650.2 Cross Slope (PAR)SF145669.6to $120 $17,4601532748ft feet 2.0-3.0671.0 Cross Slope (PAR)SF109685.5to $120 $13,0501532758ft feet 4.0-5.0686.6 Cross Slope (PAR)SF65695.2to $120 $7,7401532768ft feet695.7 Driveway748.8to165609 feet 2.0-3.0750.2 Cross Slope (PAR)SF83761.3to $120 $9,9901532778ft feet 2.0-3.0766.2 Cross Slope (PAR)SF220795.5to $120 $26,3701532788ft feet 2.0-3.0797.8 Cross Slope (PAR)SF8798.9to $120 $9901532798ft feet 2.0-3.0811.6 Cross Slope (PAR)SF42817.2to $120 $5,0401532808ft feet 2.0-3.0824.7 Cross Slope (PAR)SF8825.8to $120 $9901532818ft feet 4.0-5.0826.9 Cross Slope (PAR)SF65835.6to $120 $7,8301532828ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 449 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 44TH ST End Street Name 2001141537 Run ID Alcoa Ave 93.5 ID Sidewalk Width Priority feet 2.0-3.0835.6 Cross Slope (PAR)SF13837.3to $120 $1,5301532838ft feet 2.0-3.0843.8 Cross Slope (PAR)SF195869.8to $120 $23,4001532848ft feet 2.0-3.0872.9 Cross Slope (PAR)SF17875.1to $120 $1,9801532858ft feet 2.0-3.0877.8 Cross Slope (PAR)SF44883.7to $120 $5,3101532868ft feet 2.0-3.0886.5 Cross Slope (PAR)SF87898.1to $120 $10,4401532878ft feet .34897.7 Vertical Change REF8898.7to137232 8 ft feet 9.0-10.0901.3 Cross Slope (PAR)SF10902.6to $120 $1,1701532888ft feet911.7 Driveway938.5to165610 feet .55912.2 Vertical Change REF8913.2to137233 8 ft feet 2.0-3.0939.5 Cross Slope (PAR)SF17941.8to $120 $2,0701532898ft feet 2.0-3.0951.8 Cross Slope (PAR)SF58959.5to $120 $6,9301532908ft $411,330.00TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 450 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E VERNON AVE End Street Name 2001141546 Run ID Alcoa Ave 58.5 ID Sidewalk Width Priority feet -.280.4 Vertical Change REF81.4to137206 8 ft feet 8.0-9.00.8 Cross Slope (PAR)SF213.5to $120 $2,5111531878ft feet 3.0-4.05.3 Cross Slope (PAR)SF86.3to $120 $9301531888ft feet 2.0-3.06.3 Cross Slope (PAR)SF7315.7to $120 $8,7421531898ft feet 3.417.0 Vertical Change SF818.0to $75 $5811372078ft feet 2.0-3.018.9 Cross Slope (PAR)SF3623.6to $120 $4,3711531908ft feet 2.0-3.033.3 Cross Slope (PAR)SF1535.2to $120 $1,7671531918ft feet 2.0-3.048.5 Cross Slope (PAR)SF849.5to $120 $9301531928ft feet 4.0-5.050.7 Cross Slope (PAR)SF2954.4to $120 $3,4411531938ft feet 2.0-3.061.6 Cross Slope (PAR)SF3466.0to $120 $4,0921531948ft feet 2.0-3.069.6 Cross Slope (PAR)SF11584.4to $120 $13,7641531958ft feet 3.0-4.086.7 Cross Slope (PAR)SF987.8to $120 $1,0231531968ft feet 2.0-3.087.9 Cross Slope (PAR)SF7096.9to $120 $8,3701531978ft feet 3.0-4.099.4 Cross Slope (PAR)SF13101.1to $120 $1,5811531988ft feet 3.0-4.0106.1 Cross Slope (PAR)SF9107.3to $120 $1,1161531998ft feet 2.0-3.0107.3 Cross Slope (PAR)SF61115.2to $120 $7,3471532008ft feet 3.0-4.0118.5 Cross Slope (PAR)SF157138.7to $120 $18,7861532018ft feet 4.0-5.0142.8 Cross Slope (PAR)SF42148.2to $120 $5,0221532028ft feet 2.0-3.0157.3 Cross Slope (PAR)SF13159.0to $120 $1,5811532038ft feet 3.0-4.0163.2 Cross Slope (PAR)SF76173.0to $120 $9,1141532048ft feet 3.0-4.0178.3 Cross Slope (PAR)SF23181.3to $120 $2,7901532058ft feet 4.0-5.0184.6 Cross Slope (PAR)SF147203.6to $120 $17,6701532068ft $115,529.25TOTAL COST FOR:ALCOA AVEEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 451 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121631 Run ID Alcoa Ave 99 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF131.8to $120 $1,5661455747ft feet1.8 Driveway44.8to164941 feet 4.0-5.046.3 Cross Slope (PAR)SF15467.6to $120 $18,5311455757ft feet -.2849.8 Vertical Change REF750.8to134804 7 ft feet 2.0-3.068.0 Cross Slope (PAR)SF18994.0to $120 $22,6201455767ft feet -.2874.7 Vertical Change REF775.7to134805 7 ft feet .3476.8 Vertical Change REF777.8to134806 7 ft feet 4.0-5.094.3 Cross Slope (PAR)SF145114.3to $120 $17,4001455777ft feet 2.0-3.0114.3 Cross Slope (PAR)SF183139.5to $120 $21,9241455787ft feet .26137.2 Vertical Change REF7138.2to134807 7 ft feet 4.0-5.0140.0 Cross Slope (PAR)SF42145.8to $120 $5,0461455797ft feet 2.0-3.0145.8 Cross Slope (PAR)SF66154.9to $120 $7,9171455807ft feet 4.0-5.0154.9 Cross Slope (PAR)SF123171.8to $120 $14,7031455817ft feet .33164.5 Vertical Change REF7165.5to134808 7 ft feet 2.0-3.0171.8 Cross Slope (PAR)SF120188.3to $120 $14,3551455827ft feet -.27180.6 Vertical Change REF7181.6to134809 7 ft feet -.27189.0 Vertical Change LF7190.0to $75 $5441348107ft feet189.0 Driveway231.4to164942 feet .27230.1 Vertical Change REF7231.1to134811 7 ft feet 4.0-5.0231.8 Cross Slope (PAR)SF17234.1to $120 $2,0011455837ft feet 2.0-3.0234.1 Cross Slope (PAR)SF59242.3to $120 $7,1341455847ft feet 2.0-3.0246.0 Cross Slope (PAR)SF9247.3to $120 $1,1311455857ft feet246.5 Continuous Width SF7247.5to $120 $8701675707ft feet248.0 Driveway314.5to164943 feet .32260.2 Vertical Change REF7261.2to134812 7 ft feet .4269.0 Vertical Change REF7270.0to134813 7 ft feet .4281.6 Vertical Change REF20284.3to134814 7 ft feet .39303.9 Vertical Change REF7304.9to134815 7 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 452 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121631 Run ID Alcoa Ave 99 ID Sidewalk Width Priority feet -.26307.6 Vertical Change REF7308.6to134816 7 ft feet .42314.4 Vertical Change REF7315.4to134817 7 ft feet 3.0-4.0314.9 Cross Slope (PAR)SF43320.8to $120 $5,1331455867ft feet 5.0-6.0321.8 Cross Slope (PAR)SF30325.9to $120 $3,5671455877ft feet 3.0-4.0325.9 Cross Slope (PAR)SF47332.4to $120 $5,6551455887ft feet 5.0-6.0332.4 Cross Slope (PAR)SF119348.8to $120 $14,2681455897ft feet -.36340.1 Vertical Change REF7341.1to134818 7 ft feet340.8 Continuous Width REF7341.8to166947 7 ft feet 6.0-7.0348.8 Cross Slope (PAR)SF33353.3to $120 $3,9151455907ft feet 1354.6 Vertical Change REF7355.6to134819 7 ft feet 5.0-6.0354.6 Cross Slope (PAR)SF28358.5to $120 $3,3931455917ft feet357.6 Continuous Width SF7358.6to $120 $8701676037ft feet359.4 Driveway392.7to164944 feet .29392.0 Vertical Change REF7393.0to134821 7 ft feet 2.0-3.0394.4 Cross Slope (PAR)SF116410.4to $120 $13,9201455927ft feet395.2 Continuous Width SF7396.2to $120 $8701674997ft feet .32407.4 Vertical Change REF7408.4to134822 7 ft feet 4.0-5.0410.4 Cross Slope (PAR)SF111425.7to $120 $13,3111455937ft feet -.27422.5 Vertical Change REF7423.5to134823 7 ft feet425.8 Driveway469.3to164945 feet 2.0-3.0471.9 Cross Slope (PAR)SF38477.1to $120 $4,5241455947ft feet 2.0-3.0484.9 Cross Slope (PAR)SF25488.4to $120 $3,0451455957ft feet 4.0-5.0488.4 Cross Slope (PAR)SF40493.9to $120 $4,7851455967ft feet 3.0-4.0497.3 Cross Slope (PAR)SF61505.7to $120 $7,3081455977ft feet 2.0-3.0507.0 Cross Slope (PAR)SF89519.3to $120 $10,7011455987ft feet521.1 Driveway551.2to164946 feet -.27521.7 Vertical Change REF7522.7to134825 7 ft feet .94536.7 Vertical Change REF7537.7to134826 7 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 453 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121631 Run ID Alcoa Ave 99 ID Sidewalk Width Priority feet 5.0-6.0551.8 Cross Slope (PAR)SF38557.0to $120 $4,5241455997ft feet 3.0-4.0557.0 Cross Slope (PAR)SF9558.2to $120 $1,0441456007ft feet 2.0-3.0558.2 Cross Slope (PAR)SF15560.3to $120 $1,8271456017ft feet560.5 Driveway597.8to164947 feet 1.78574.5 Vertical Change REF7575.5to134827 7 ft feet 2.0-3.0601.9 Cross Slope (PAR)SF28605.7to $120 $3,3061456027ft feet 4.0-5.0607.9 Cross Slope (PAR)SF123624.8to $120 $14,7031456037ft feet612.4 Continuous Width SF7613.4to $120 $8701674687ft feet -.33613.8 Vertical Change REF7614.8to134829 7 ft feet 6.0-7.0625.1 Cross Slope (PAR)SF17627.5to $120 $2,0881456047ft feet 5.0-6.0627.5 Cross Slope (PAR)SF8628.6to $120 $9571456057ft feet 3.0-4.0636.8 Cross Slope (PAR)SF105651.3to $120 $12,6151456067ft feet 4.0-5.0653.7 Cross Slope (PAR)SF18656.2to $120 $2,1751456077ft feet 4.0-5.0658.3 Cross Slope (PAR)SF135676.9to $120 $16,1821456087ft feet666.9 Continuous Width REF7667.9to166852 7 ft feet -.5669.5 Vertical Change REF7670.5to134830 7 ft feet676.6 Continuous Width SF7677.6to $120 $8701674487ft feet 2.0-3.0676.9 Cross Slope (PAR)SF117693.1to $120 $14,0941456097ft feet 2.62678.9 Vertical Change REF7679.9to134831 7 ft feet691.8 Continuous Width REF7692.8to167241 7 ft feet 2.0-3.0697.6 Cross Slope (PAR)SF54705.0to $120 $6,4381456107ft feet 4.0-5.0705.0 Cross Slope (PAR)SF63713.7to $120 $7,5691456117ft feet 2.0-3.0715.2 Cross Slope (PAR)SF31719.5to $120 $3,7411456127ft feet -.35718.3 Vertical Change REF7719.3to134832 7 ft feet 4.0-5.0720.3 Cross Slope (PAR)SF25723.8to $120 $3,0451456137ft feet 2.0-3.0726.3 Cross Slope (PAR)SF20729.1to $120 $2,4361456147ft feet 4.0-5.0729.1 Cross Slope (PAR)SF31733.4to $120 $3,7411456157ft feet 2.0-3.0734.6 Cross Slope (PAR)SF107749.3to $120 $12,7891456167ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 454 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E SLAUSON AVE End Street Name 1912121631 Run ID Alcoa Ave 99 ID Sidewalk Width Priority feet735.8 Continuous Width SF7736.8to $120 $8701675927ft feet 2.0-3.0752.7 Cross Slope (PAR)SF95765.8to $120 $11,3971456177ft feet 2.0-3.0772.0 Cross Slope (PAR)SF131790.0to $120 $15,6601456187ft feet784.3 Continuous Width REF7785.3to167264 7 ft feet 4.0-5.0791.1 Cross Slope (PAR)SF136809.8to $120 $16,2691456197ft feet -.46806.4 Vertical Change REF7807.4to134834 7 ft feet 2.0-3.0810.5 Cross Slope (PAR)SF170833.9to $120 $20,3581456207ft feet812.7 Continuous Width REF7813.7to167734 7 ft feet 6.0-7.0833.7 Running Slope REF8834.8to166447 7 ft feet 8.0-9.0834.9 Running Slope SF43840.8to $120 $5,1331664487ft feet -.85842.9 Vertical Change SF7843.9to $75 $5441348357ft feet 4.0-5.0846.8 Cross Slope (PAR)SF78857.5to $120 $9,3091456217ft feet 7.0-8.0848.8 Running Slope REF27852.5to166449 7 ft feet 2.0-3.0857.5 Cross Slope (PAR)SF60865.8to $120 $7,2211456227ft feet 2.0-3.0893.6 Cross Slope (PAR)SF49900.4to $120 $5,9161456237ft feet 5.0-6.0897.4 Running Slope REF28901.3to166450 7 ft feet 6.0-7.0901.3 Running Slope REF9902.6to166451 7 ft feet 4.0-5.0901.4 Cross Slope (PAR)SF20904.2to $120 $2,4361456247ft feet 2.0-3.0911.6 Cross Slope (PAR)SF12913.3to $120 $1,4791456257ft feet 3.0-4.0916.3 Cross Slope (PAR)SF13918.1to $120 $1,5661456267ft feet918.3 Continuous Width SF7919.3to $120 $8701669967ft $445,048.50TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 455 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING (4927 ALCOA AVE) End Street Name 1912200937 Run ID Alcoa Ave 60 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF506.5to $120 $6,0451479758ft feet 2.0-3.011.5 Cross Slope (PAR)SF19837.0to $120 $23,7151479768ft feet -.4624.9 Vertical Change REF825.9to135864 8 ft feet -.329.1 Vertical Change REF830.1to135865 8 ft feet 4.0-5.037.0 Cross Slope (PAR)SF5544.1to $120 $6,6031479778ft feet 2.0-3.044.8 Cross Slope (PAR)SF10958.9to $120 $13,1131479788ft feet 2.0-3.068.1 Cross Slope (PAR)SF3072.0to $120 $3,6271479798ft feet 2.0-3.076.3 Cross Slope (PAR)SF3680.9to $120 $4,2781479808ft feet 2.0-3.086.5 Cross Slope (PAR)SF3691.1to $120 $4,2781479818ft feet 2.0-3.099.5 Cross Slope (PAR)SF40104.7to $120 $4,8361479828ft feet 2.0-3.0108.6 Cross Slope (PAR)SF403160.6to $120 $48,3601479838ft feet -.34113.1 Vertical Change REF8114.1to135866 8 ft feet .36119.1 Vertical Change REF8120.1to135867 8 ft feet .32162.6 Vertical Change REF8163.6to135868 8 ft feet 4.0-5.0163.0 Cross Slope (PAR)SF10164.3to $120 $1,2091479848ft feet 3.0-4.0167.9 Cross Slope (PAR)SF50174.3to $120 $5,9521479858ft feet 2.0-3.0175.0 Cross Slope (PAR)SF9176.2to $120 $1,1161479868ft feet -.3181.1 Vertical Change LF8182.1to $75 $5811358698ft feet185.5 Driveway241.2to165174 feet -.36199.1 Vertical Change REF8200.1to135870 8 ft feet -.27237.7 Vertical Change REF8238.7to135871 8 ft $123,713.25TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 456 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name LEONIS BLVD End Street Name 2001141521 Run ID Alcoa Ave 71 ID Sidewalk Width Priority feet 2.0-3.06.7 Cross Slope (PAR)SF5418.6to $120 $6,4261533095ft feet20.3 Continuous Width SF521.3to $120 $5401674205ft feet 2.0-3.021.8 Cross Slope (PAR)SF2226.7to $120 $2,6461533105ft feet 2.0-3.031.3 Cross Slope (PAR)SF3238.5to $120 $3,8881533115ft feet33.3 Continuous Width SF534.3to $120 $5401674215ft feet .5135.9 Vertical Change REF536.9to137236 5 ft feet 4.0-5.038.7 Cross Slope (PAR)SF2544.3to $120 $3,0241533125ft feet 2.0-3.045.2 Cross Slope (PAR)SF3553.0to $120 $4,2121533135ft feet 4.0-5.053.3 Cross Slope (PAR)SF7870.7to $120 $9,3961533145ft feet .2655.6 Vertical Change REF556.6to137237 5 ft feet 2.0-3.071.7 Cross Slope (PAR)SF973.8to $120 $1,1341533155ft feet 2.0-3.077.0 Cross Slope (PAR)SF1981.3to $120 $2,3221533165ft feet85.2 Continuous Width SF586.2to $120 $5401669205ft feet 2.0-3.086.7 Cross Slope (PAR)SF2391.8to $120 $2,7541533175ft feet 2.0-3.094.7 Cross Slope (PAR)SF86113.8to $120 $10,3141533185ft feet113.6 Continuous Width SF5114.6to $120 $5401674605ft feet 4.0-5.0115.3 Cross Slope (PAR)SF60128.7to $120 $7,2361533195ft feet -.26126.4 Vertical Change REF5127.4to137238 5 ft feet128.0 Continuous Width REF5129.0to166954 5 ft feet 2.0-3.0128.7 Cross Slope (PAR)SF14131.9to $120 $1,7281533205ft feet 3.0-4.0136.8 Cross Slope (PAR)SF9138.8to $120 $1,0801533215ft feet 2.0-3.0138.8 Cross Slope (PAR)SF23143.9to $120 $2,7541533225ft feet 4.0-5.0144.8 Cross Slope (PAR)SF29151.2to $120 $3,4561533235ft feet146.0 Continuous Width SF5147.0to $120 $5401669955ft feet 2.0-3.0151.8 Cross Slope (PAR)SF28158.1to $120 $3,4021533245ft feet152.4 Continuous Width SF5153.4to $120 $5401668095ft $69,012.00TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 457 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 44TH ST End Street Name 2001141659 Run ID Alcoa Ave 38 ID Sidewalk Width Priority feet 3.0-4.00.3 Cross Slope (PAR)SF203.0to $120 $2,4301528678ft feet3.0 Driveway14.8to165582 feet 2.0-3.014.8 Cross Slope (Driveway)SF2618.3to $40 $1,0501528688ft feet 2.0-3.021.3 Cross Slope (PAR)SF22150.8to $120 $26,5501528698ft feet .5927.4 Vertical Change REF2630.9to137140 8 ft feet .333.1 Vertical Change REF834.1to137141 8 ft feet -.4336.3 Vertical Change REF837.3to137142 8 ft feet 2.0-3.060.8 Cross Slope (PAR)SF2864.6to $120 $3,4201528708ft feet 2.0-3.066.9 Cross Slope (PAR)SF4873.3to $120 $5,7601528718ft feet 2.0-3.076.3 Cross Slope (PAR)SF1177.8to $120 $1,3501528728ft feet 3.0-4.080.1 Cross Slope (PAR)SF4786.4to $120 $5,6701528738ft feet 2.0-3.086.6 Cross Slope (PAR)SF123103.0to $120 $14,7601528748ft feet 3.0-4.0105.6 Cross Slope (PAR)SF23108.7to $120 $2,7901528758ft feet 2.0-3.0109.2 Cross Slope (PAR)SF82120.1to $120 $9,8101528768ft feet 2.0-3.0123.4 Cross Slope (PAR)SF72133.0to $120 $8,6401528778ft feet 2.0-3.0147.1 Cross Slope (PAR)SF80157.8to $120 $9,6301528788ft feet 2.0-3.0170.7 Cross Slope (PAR)SF24173.9to $120 $2,8801528798ft feet 2.0-3.0177.3 Cross Slope (PAR)SF11178.7to $120 $1,2601528808ft feet 2.0-3.0182.8 Cross Slope (PAR)SF81193.6to $120 $9,7201528818ft feet 4.0-5.0193.6 Cross Slope (PAR)SF71203.0to $120 $8,4601528828ft feet 4.0-5.0205.1 Cross Slope (PAR)SF8206.2to $120 $9901528838ft feet 2.0-3.0207.9 Cross Slope (PAR)SF80218.5to $120 $9,5401528848ft $124,710.00TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 458 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W ALCOA AVE Street Side TRAIN CROSSING (4927 ALCOA AVE) Survey Street Name Starting Street Name E 50TH ST End Street Name 1912200943 Run ID Alcoa Ave 104 ID Sidewalk Width Priority feet 5.0-6.00.2 Cross Slope (PAR)SF7215.3to $120 $8,6071479655ft feet 6.0-7.018.5 Cross Slope (PAR)SF619.8to $120 $7411479665ft feet 11.0-12.022.8 Cross Slope (PAR)SF1626.1to $120 $1,8811479675ft feet 13.0-14.028.3 Cross Slope (PAR)SF2132.7to $120 $2,5081479685ft feet 12.0-13.036.3 Cross Slope (PAR)SF1940.2to $120 $2,2231479695ft feet 14.0-15.040.2 Cross Slope (PAR)SF1844.0to $120 $2,1661479705ft feet -.2846.2 Vertical Change LF547.2to $75 $3561358605ft feet50.7 Continuous Width SF551.7to $120 $5701674105ft feet 2.0-3.051.5 Cross Slope (PAR)SF2156.0to $120 $2,5651479715ft feet 3.3256.3 Vertical Change SF557.3to $75 $3561358615ft feet 2.0-3.060.2 Cross Slope (PAR)SF7976.8to $120 $9,4621479725ft feet68.3 Continuous Width SF569.3to $120 $5701671545ft feet -.2672.8 Vertical Change REF573.8to135862 5 ft feet76.8 Driveway102.2to165173 feet 4.0-5.0103.3 Cross Slope (PAR)SF5104.3to $120 $5701479735ft feet 2.0-3.0104.8 Cross Slope (PAR)SF9106.7to $120 $1,0831479745ft feet 2.77109.4 Vertical Change SF5110.4to $75 $3561358635ft feet111.8 Continuous Width REF5112.8to166870 5 ft $34,014.75TOTAL COST FOR:ALCOA AVEWside of Starting at:TRAIN CROSSING (4927 ALCOA AVE) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 459 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N / E AYERS AVE Street Side 4395 AYERS AVE Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001171008 Run ID Ayers Ave 55 ID Sidewalk Width Priority feet 3.0-4.00.8 Cross Slope (PAR)SF304.3to $120 $3,5701586759ft feet7.1 Driveway56.9to165993 feet .3457.1 Vertical Change REF958.1to138288 9 ft feet 3.0-4.060.6 Cross Slope (PAR)SF1161.9to $120 $1,3261586769ft feet 2.0-3.062.1 Cross Slope (PAR)SF963.1to $120 $1,0201586779ft feet 2.2866.2 Vertical Change SF967.2to $75 $6381382899ft feet -.4372.2 Vertical Change LF973.2to $75 $6381382919ft feet .2873.9 Vertical Change LF974.9to $75 $6381382929ft feet -.3176.1 Vertical Change LF977.1to $75 $6381382939ft feet .3978.1 Vertical Change LF2480.9to $75 $1,7851382949ft feet 5.0-6.079.9 Cross Slope (PAR)SF2683.0to $120 $3,1621586789ft feet -.2881.8 Vertical Change REF982.8to138295 9 ft feet 2.0-3.083.9 Cross Slope (PAR)SF2586.8to $120 $2,9581586799ft feet88.7 Driveway111.3to165994 feet 3.0-4.0112.4 Cross Slope (PAR)SF97123.8to $120 $11,6281586809ft feet .31119.7 Vertical Change REF9120.7to138296 9 ft feet 2.0-3.0124.1 Cross Slope (PAR)SF62131.4to $120 $7,4461586819ft feet 4.0-5.0134.3 Cross Slope (PAR)SF52140.4to $120 $6,2221586829ft feet143.6 Driveway167.5to165995 feet 3.0-4.0168.3 Cross Slope (Driveway)SF19170.5to $40 $7481586839ft feet171.4 Cold Patch 14173.0to140561 9 ft feet 3.0-4.0174.4 Cross Slope (PAR)SF24177.2to $120 $2,8561586849ft feet .29176.5 Vertical Change REF9177.5to138297 9 ft feet 2.0-3.0181.6 Cross Slope (PAR)SF19183.8to $120 $2,2441586859ft feet .26182.7 Vertical Change REF9183.7to138298 9 ft feet .3187.1 Vertical Change LF9188.1to $75 $6381382999ft feet .26191.1 Vertical Change LF48196.7to $75 $3,5701383009ft feet 5.0-6.0196.7 Cross Slope (PAR)SF31200.3to $120 $3,6721586869ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 460 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N / E AYERS AVE Street Side 4395 AYERS AVE Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001171008 Run ID Ayers Ave 55 ID Sidewalk Width Priority feet 1.87199.2 Vertical Change REF9200.2to138301 9 ft feet 2.0-3.0200.8 Cross Slope (PAR)SF9201.8to $120 $1,0201586879ft feet .29203.3 Vertical Change LF40208.0to $75 $2,9961383029ft feet 4.0-5.0206.1 Cross Slope (PAR)SF31209.7to $120 $3,6721586889ft feet 2.0-3.0209.7 Cross Slope (PAR)SF49215.5to $120 $5,9161586899ft feet 2.0-3.0218.7 Cross Slope (PAR)SF224245.1to $120 $26,9281586909ft feet 3.49220.6 Vertical Change REF9221.6to138303 9 ft feet .4225.2 Vertical Change REF9226.2to138304 9 ft feet .26231.9 Vertical Change REF9232.9to138305 9 ft feet 4.0-5.0247.3 Cross Slope (PAR)SF33251.2to $120 $3,9781586919ft feet 3.0-4.0254.0 Cross Slope (PAR)SF11255.3to $120 $1,3261586929ft feet 2.0-3.0256.3 Cross Slope (PAR)SF26259.3to $120 $3,0601586939ft feet 3.0-4.0262.0 Cross Slope (PAR)SF75270.8to $120 $8,9761586949ft feet 3.0-4.0274.2 Cross Slope (PAR)SF9275.3to $120 $1,1221586959ft feet 2.0-3.0277.9 Cross Slope (PAR)SF11279.2to $120 $1,3261586969ft feet 3.0-4.0282.2 Cross Slope (PAR)SF148299.6to $120 $17,7481586979ft feet 5.0-6.0299.6 Cross Slope (PAR)SF87309.8to $120 $10,4041586989ft feet 3.0-4.0311.6 Cross Slope (PAR)SF60318.7to $120 $7,2421586999ft feet320.4 Driveway340.3to165996 feet 3.0-4.0344.2 Cross Slope (PAR)SF50350.1to $120 $6,0181587009ft feet 2.0-3.0350.3 Cross Slope (PAR)SF97361.7to $120 $11,6281587019ft feet 2.0-3.0367.9 Cross Slope (PAR)SF24370.7to $120 $2,8561587029ft feet 2.0-3.0374.0 Cross Slope (PAR)SF23376.7to $120 $2,7541587039ft feet376.7 Cold Patch 25379.6to140562 9 ft feet376.7 Cold Patch 66384.5to140563 9 ft feet -.47377.4 Vertical Change LF9378.4to $75 $6381383079ft feet 2.0-3.0381.3 Cross Slope (PAR)SF27384.5to $120 $3,2641587049ft $178,266.25TOTAL COST FOR:AYERS AVEN / E side of Starting at:4395 AYERS AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 461 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S AYERS AVE Street Side 4398 AYERS AVE Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001170946 Run ID Ayers Ave 88.25 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF546.4to $120 $6,5281588519ft feet 3.0-4.08.5 Cross Slope (PAR)SF15827.1to $120 $18,9721588529ft feet 2.0-3.027.1 Cross Slope (PAR)SF8737.3to $120 $10,4041588539ft feet 3.0-4.041.3 Cross Slope (PAR)SF4947.1to $120 $5,9161588549ft feet 2.0-3.047.9 Cross Slope (PAR)SF19570.8to $120 $23,3581588559ft feet 2.0-3.073.4 Cross Slope (PAR)SF974.5to $120 $1,1221588569ft feet 4.0-5.075.1 Cross Slope (PAR)SF10687.6to $120 $12,7501588579ft feet 3.0-4.091.0 Cross Slope (PAR)SF5497.4to $120 $6,5281588589ft feet 5.0-6.095.6 Running Slope REF2097.9to166632 9 ft feet98.3 Driveway149.0to166004 feet .81135.5 Vertical Change REF9136.5to138356 9 ft feet 5.0-6.0149.1 Cross Slope (Driveway)SF14150.8to $40 $5781588599ft feet 3.0-4.0152.2 Cross Slope (PAR)SF9153.3to $120 $1,1221588609ft feet 2.0-3.0155.0 Cross Slope (PAR)SF14156.6to $120 $1,6321588619ft feet167.0 Driveway217.3to166005 feet .26225.9 Vertical Change REF9226.9to138357 9 ft feet 2.0-3.0226.8 Cross Slope (PAR)SF14228.4to $120 $1,6321588629ft feet 2.0-3.0232.8 Cross Slope (PAR)SF81242.3to $120 $9,6901588639ft feet 2.0-3.0244.5 Cross Slope (PAR)SF11245.8to $120 $1,3261588649ft feet245.8 Driveway275.7to166006 feet .28276.7 Vertical Change LF9277.7to $75 $6381383589ft feet -.28279.5 Vertical Change LF9280.5to $75 $6381383599ft feet .34282.4 Vertical Change LF25285.3to $75 $1,8491383609ft feet -.26286.9 Vertical Change LF9287.9to $75 $6381383619ft feet 2.0-3.0291.3 Cross Slope (PAR)SF10292.5to $120 $1,2241588659ft feet -.26292.2 Vertical Change REF9293.2to138363 9 ft feet 2.0-3.0297.4 Cross Slope (PAR)SF9298.5to $120 $1,1221588669ft feet303.1 Driveway332.3to166007 feet 3.0-4.0334.1 Cross Slope (PAR)SF84344.0to $120 $10,0981588679ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 462 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S AYERS AVE Street Side 4398 AYERS AVE Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001170946 Run ID Ayers Ave 88.25 ID Sidewalk Width Priority feet 4.0-5.0347.5 Cross Slope (PAR)SF31351.2to $120 $3,7741588689ft feet 2.0-3.0355.2 Cross Slope (PAR)SF46360.6to $120 $5,5081588699ft feet 4.0-5.0361.0 Cross Slope (PAR)SF43366.1to $120 $5,2021588709ft feet 2.0-3.0366.8 Cross Slope (PAR)SF153384.8to $120 $18,3601588719ft feet 2.0-3.0388.6 Cross Slope (PAR)SF11389.9to $120 $1,3261588729ft feet 2.0-3.0394.9 Cross Slope (PAR)SF17396.9to $120 $2,0401588739ft feet404.2 Driveway433.5to166008 feet 2.0-3.0440.1 Cross Slope (PAR)SF17442.1to $120 $2,0401588749ft feet445.0 Driveway474.1to166009 feet 2.0-3.0474.2 Cross Slope (Driveway)SF33478.1to $40 $1,3261588759ft feet 4.0-5.0484.3 Cross Slope (PAR)SF40489.0to $120 $4,7941588769ft feet 2.0-3.0489.0 Cross Slope (PAR)SF55495.5to $120 $6,6301588779ft feet 2.0-3.0500.0 Cross Slope (PAR)SF115513.5to $120 $13,7701588789ft feet513.5 Driveway537.8to166010 feet540.2 Driveway570.8to166011 feet 2.0-3.0570.8 Cross Slope (Driveway)SF9571.8to $40 $3401588799ft feet 3.0-4.0576.8 Cross Slope (PAR)SF60583.9to $120 $7,2421588809ft feet 1.1579.9 Vertical Change REF9580.9to138364 9 ft feet 2.0-3.0583.9 Cross Slope (PAR)SF49589.7to $120 $5,9161588819ft feet -.32584.7 Vertical Change REF9585.7to138365 9 ft feet 2.0-3.0600.3 Cross Slope (PAR)SF38604.8to $120 $4,5901588829ft feet -.51607.2 Vertical Change SF9608.2to $75 $6381383669ft feet 3.0-4.0608.5 Cross Slope (PAR)SF35612.6to $120 $4,1821588839ft feet 5.0-6.0612.6 Cross Slope (PAR)SF24615.4to $120 $2,8561588849ft feet 3.0-4.0615.6 Cross Slope (PAR)SF26618.6to $120 $3,0601588859ft feet618.6 Driveway670.5to166012 feet .26622.6 Vertical Change REF25625.5to138367 9 ft feet .28630.6 Vertical Change REF9631.6to138368 9 ft feet .3660.0 Vertical Change REF9661.0to138369 9 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 463 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S AYERS AVE Street Side 4398 AYERS AVE Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001170946 Run ID Ayers Ave 88.25 ID Sidewalk Width Priority feet -.37690.6 Vertical Change LF9691.6to $75 $6381383709ft feet 2.0-3.0696.9 Cross Slope (PAR)SF26699.9to $120 $3,0601588869ft feet 2.0-3.0709.5 Cross Slope (PAR)SF35713.6to $120 $4,1821588879ft feet 2.0-3.0718.5 Cross Slope (PAR)SF9719.6to $120 $1,1221588889ft feet 2.0-3.0732.3 Cross Slope (PAR)SF24735.1to $120 $2,8561588899ft feet 2.0-3.0747.8 Cross Slope (PAR)SF114761.2to $120 $13,6681588909ft feet765.6 Driveway809.3to166013 feet 2.0-3.0809.3 Cross Slope (Driveway)SF9810.4to $40 $3741588919ft feet 2.0-3.0817.9 Cross Slope (PAR)SF9819.0to $120 $1,1221588929ft feet 2.0-3.0827.7 Cross Slope (PAR)SF71836.1to $120 $8,5681588939ft feet 2.0-3.0842.1 Cross Slope (PAR)SF10843.3to $120 $1,2241588949ft feet 2.0-3.0847.0 Cross Slope (PAR)SF45852.3to $120 $5,4061588959ft feet 2.0-3.0854.7 Cross Slope (PAR)SF29858.1to $120 $3,4681588969ft feet 2.0-3.0863.5 Cross Slope (PAR)SF9864.6to $120 $1,1221588979ft feet 2.0-3.0867.9 Cross Slope (PAR)SF167887.5to $120 $19,9921588989ft feet 3.0-4.0889.7 Cross Slope (PAR)SF15891.5to $120 $1,8361588999ft feet 2.0-3.0892.8 Cross Slope (PAR)SF335932.2to $120 $40,1881589009ft feet .29914.4 Vertical Change REF9915.4to138371 9 ft feet 2.0-3.0945.2 Cross Slope (PAR)SF26948.3to $120 $3,1621589019ft feet948.3 Driveway988.8to166014 feet948.3 Driveway1253.0to166015 feet -.44985.3 Vertical Change REF9986.3to138372 9 ft feet 3.0-4.0988.8 Cross Slope (Driveway)SF17990.8to $40 $6801589029ft feet 2.0-3.0990.8 Cross Slope (Driveway)SF19993.0to $40 $7481589039ft feet -.28991.7 Vertical Change REF9992.7to138373 9 ft feet .28998.9 Vertical Change REF9999.9to138374 9 ft feet .381002.9 Vertical Change REF91003.9to138375 9 ft feet 2.0-3.01004.7 Cross Slope (Driveway)SF331008.6to $40 $1,3261589049ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 464 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S AYERS AVE Street Side 4398 AYERS AVE Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001170946 Run ID Ayers Ave 88.25 ID Sidewalk Width Priority feet 5.0-6.01010.6 Cross Slope (Driveway)SF261013.6to $40 $1,0201589059ft feet 2.0-3.01015.3 Cross Slope (Driveway)SF391019.9to $40 $1,5641589069ft feet 3.0-4.01022.1 Cross Slope (Driveway)SF131023.6to $40 $5101589079ft feet 2.0-3.01044.5 Cross Slope (Driveway)SF371048.9to $40 $1,4961589089ft feet 4.0-5.01053.3 Cross Slope (Driveway)SF91054.3to $40 $3401589099ft feet 3.0-4.01057.0 Cross Slope (Driveway)SF451062.3to $40 $1,8021589109ft feet 3.0-4.01067.3 Cross Slope (Driveway)SF1841089.0to $40 $7,3781589119ft feet 4.0-5.01091.5 Cross Slope (Driveway)SF651099.1to $40 $2,5841589129ft feet .291095.6 Vertical Change REF91096.6to138376 9 ft feet 4.0-5.01101.3 Cross Slope (Driveway)SF191103.5to $40 $7481589139ft feet 3.0-4.01105.8 Cross Slope (Driveway)SF291109.2to $40 $1,1561589149ft feet 2.0-3.01111.3 Cross Slope (Driveway)SF891121.8to $40 $3,5701589159ft feet .331115.4 Vertical Change REF301118.9to138377 9 ft feet -.471120.1 Vertical Change REF91121.1to138378 9 ft feet .281122.0 Vertical Change REF291125.4to138379 9 ft feet 2.971126.7 Vertical Change REF91127.7to138380 9 ft feet 4.0-5.01129.9 Cross Slope (Driveway)SF751138.7to $40 $2,9921589169ft feet 5.0-6.01141.9 Cross Slope (Driveway)SF1151155.4to $40 $4,5901589179ft feet 2.0-3.01155.8 Cross Slope (Driveway)SF1051168.1to $40 $4,1821589189ft feet 3.0-4.01170.5 Cross Slope (Driveway)SF671178.4to $40 $2,6861589199ft feet .281175.8 Vertical Change REF91176.8to138381 9 ft feet 2.0-3.01180.3 Cross Slope (Driveway)SF821190.0to $40 $3,2981589209ft feet 2.0-3.01192.7 Cross Slope (Driveway)SF481198.4to $40 $1,9381589219ft feet 2.0-3.01204.7 Cross Slope (Driveway)SF361208.9to $40 $1,4281589229ft feet 3.0-4.01211.6 Cross Slope (Driveway)SF1751232.2to $40 $7,0041589239ft feet 4.0-5.01238.6 Cross Slope (Driveway)SF211241.1to $40 $8501589249ft feet 6.0-7.01241.1 Cross Slope (Driveway)SF331245.0to $40 $1,3261589259ft feet 5.0-6.01245.0 Cross Slope (Driveway)SF101246.2to $40 $4081589269ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 465 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S AYERS AVE Street Side 4398 AYERS AVE Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001170946 Run ID Ayers Ave 88.25 ID Sidewalk Width Priority feet 3.0-4.01247.2 Cross Slope (Driveway)SF411252.0to $40 $1,6321589279ft feet 5.0-6.01250.0 Running Slope REF201252.3to166633 9 ft $380,600.25TOTAL COST FOR:AYERS AVESside of Starting at:4398 AYERS AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 466 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161015 Run ID Ayers Ave 88.25 ID Sidewalk Width Priority feet 5.0-6.00.1 Cross Slope (PAR)SF163.6to $120 $1,8901576865ft feet 6.0-7.04.0 Cross Slope (PAR)SF228.8to $120 $2,5921576875ft feet 4.0-5.011.7 Cross Slope (PAR)SF813.5to $120 $9721576885ft feet 6.0-7.015.4 Cross Slope (PAR)SF3322.8to $120 $3,9961576895ft feet 5.0-6.022.8 Cross Slope (PAR)SF3330.2to $120 $3,9961576905ft feet 3.0-4.031.0 Cross Slope (PAR)SF1835.1to $120 $2,2141576915ft feet 2.0-3.038.5 Cross Slope (PAR)SF1241.1to $120 $1,4041576925ft feet43.8 Continuous Width REF544.8to167236 5 ft feet 3.0-4.045.2 Cross Slope (PAR)SF1849.2to $120 $2,1601576935ft feet -.4645.7 Vertical Change REF546.7to138073 5 ft feet .3247.9 Vertical Change REF548.9to138074 5 ft feet 2.0-3.053.3 Cross Slope (PAR)SF2458.6to $120 $2,8621576945ft feet 2.0-3.062.7 Cross Slope (Driveway)SF1967.0to $40 $7741576955ft feet 3.0-4.074.4 Cross Slope (Driveway)SF1878.3to $40 $7021576965ft feet 2.0-3.085.3 Cross Slope (Driveway)SF2691.1to $40 $1,0441576975ft feet 4.0-5.091.1 Cross Slope (Driveway)SF60104.4to $40 $2,3941576985ft feet 2.0-3.0107.2 Cross Slope (PAR)SF43116.7to $120 $5,1301576995ft feet 3.0-4.0124.7 Cross Slope (PAR)SF19129.0to $120 $2,3221577005ft feet 2.0-3.0131.1 Cross Slope (PAR)SF35138.8to $120 $4,1581577015ft feet 1.9139.9 Vertical Change SF5140.9to $75 $3381380765ft feet 3.0-4.0143.5 Cross Slope (PAR)SF20147.9to $120 $2,3761577025ft feet 4.0-5.0150.3 Cross Slope (PAR)SF47160.7to $120 $5,6161577035ft feet153.3 Continuous Width REF5154.3to167237 5 ft feet 2.0-3.0160.7 Cross Slope (PAR)SF35168.4to $120 $4,1581577045ft feet 3.0-4.0171.0 Cross Slope (PAR)SF10173.3to $120 $1,2421577055ft feet 3.0-4.0178.8 Cross Slope (PAR)SF14181.8to $120 $1,6201577065ft feet 2.0-3.0182.7 Cross Slope (PAR)SF48193.3to $120 $5,7241577075ft feet 3.0-4.0199.0 Cross Slope (PAR)SF9200.9to $120 $1,0261577085ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 467 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161015 Run ID Ayers Ave 88.25 ID Sidewalk Width Priority feet 3.0-4.0204.8 Cross Slope (PAR)SF11207.2to $120 $1,2961577095ft feet 2.0-3.0208.2 Cross Slope (PAR)SF123235.5to $120 $14,7421577105ft feet 4.0-5.0236.4 Cross Slope (PAR)SF25242.0to $120 $3,0241577115ft feet242.3 Continuous Width SF5243.3to $120 $5401668245ft feet 4.0-5.0246.1 Cross Slope (PAR)SF75262.7to $120 $8,9641577125ft feet 4.0-5.0264.8 Cross Slope (PAR)SF16268.4to $120 $1,9441577135ft feet 3.0-4.0271.3 Cross Slope (PAR)SF12273.9to $120 $1,4041577145ft feet 5.0-6.0274.1 Cross Slope (PAR)SF5275.3to $120 $6481577155ft feet 6.0-7.0275.3 Cross Slope (PAR)SF6276.6to $120 $7021577165ft feet 5.0-6.0277.6 Cross Slope (PAR)SF25283.1to $120 $2,9701577175ft feet 3.0-4.0284.8 Cross Slope (PAR)SF11287.2to $120 $1,2961577185ft feet 2.0-3.0289.0 Cross Slope (PAR)SF81307.0to $120 $9,7201577195ft feet 4.0-5.0307.6 Cross Slope (PAR)SF6308.9to $120 $7021577205ft feet .32311.9 Vertical Change LF5312.9to $75 $3381380775ft feet 3.0-4.0314.3 Cross Slope (PAR)SF6315.7to $120 $7561577215ft feet 3.0-4.0318.9 Cross Slope (PAR)SF5319.9to $120 $5401577225ft feet 4.0-5.0322.3 Cross Slope (PAR)SF42331.6to $120 $5,0221577235ft feet 5.0-6.0329.0 Running Slope REF5330.1to166609 5 ft feet331.6 Cold Patch 7333.2to140557 5 ft feet 7.0-8.0334.0 Cross Slope (PAR)SF24339.3to $120 $2,8621577245ft feet 5.0-6.0339.8 Cross Slope (PAR)SF9341.7to $120 $1,0261577255ft feet 3.0-4.0343.3 Cross Slope (PAR)SF6344.6to $120 $7021577265ft feet 2.0-3.0344.6 Cross Slope (PAR)SF26350.4to $120 $3,1321577275ft feet 2.73347.2 Vertical Change REF5348.2to138078 5 ft $123,039.00TOTAL COST FOR:AYERS AVESWside of Starting at:BANDINI BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 468 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W / N AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name 4395 AYERS AVE End Street Name 2001171001 Run ID Ayers Ave 81 ID Sidewalk Width Priority feet 4.0-5.00.3 Cross Slope (PAR)SF11113.3to $120 $13,2601587059ft feet 3.0-4.016.3 Cross Slope (PAR)SF6824.3to $120 $8,1601587069ft feet 2.0-3.027.2 Cross Slope (PAR)SF6935.3to $120 $8,2621587079ft feet 3.0-4.042.0 Cross Slope (PAR)SF1543.8to $120 $1,8361587089ft feet 2.0-3.044.6 Cross Slope (PAR)SF1045.8to $120 $1,2241587099ft feet 2.0-3.048.8 Cross Slope (PAR)SF16267.9to $120 $19,4821587109ft feet 2.0-3.070.8 Cross Slope (PAR)SF4275.7to $120 $4,9981587119ft feet 3.0-4.077.8 Cross Slope (PAR)SF16697.3to $120 $19,8901587129ft feet 2.0-3.0102.6 Cross Slope (PAR)SF14104.2to $120 $1,6321587139ft feet 3.0-4.0106.9 Cross Slope (PAR)SF56113.5to $120 $6,7321587149ft feet 2.0-3.0113.5 Cross Slope (PAR)SF79122.8to $120 $9,4861587159ft feet 2.0-3.0127.3 Cross Slope (PAR)SF13128.8to $120 $1,5301587169ft feet 4.0-5.0131.8 Cross Slope (PAR)SF13133.3to $120 $1,5301587179ft feet 2.0-3.0133.8 Cross Slope (PAR)SF9134.8to $120 $1,0201587189ft feet 2.0-3.0141.7 Cross Slope (PAR)SF43146.8to $120 $5,2021587199ft feet 3.0-4.0152.1 Cross Slope (PAR)SF10153.3to $120 $1,2241587209ft feet 5.0-6.0154.4 Cross Slope (PAR)SF82164.0to $120 $9,7921587219ft feet 2.0-3.0165.1 Cross Slope (PAR)SF65172.7to $120 $7,7521587229ft feet 4.0-5.0172.7 Cross Slope (PAR)SF118186.6to $120 $14,1781587239ft feet -.3187.3 Vertical Change LF9188.3to $75 $6381383089ft feet 5.0-6.0188.8 Cross Slope (PAR)SF22191.4to $120 $2,6521587249ft feet 5.0-6.0197.5 Cross Slope (PAR)SF20199.9to $120 $2,4481587259ft feet -.26199.5 Vertical Change REF48205.2to138309 9 ft feet 3.0-4.0200.5 Cross Slope (PAR)SF10201.7to $120 $1,2241587269ft feet 2.0-3.0205.8 Cross Slope (PAR)SF47211.3to $120 $5,6101587279ft feet .26206.1 Vertical Change REF62213.4to138310 9 ft feet -.33216.9 Vertical Change LF9217.9to $75 $6381383119ft feet 4.0-5.0218.7 Cross Slope (PAR)SF22221.3to $120 $2,6521587289ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 469 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W / N AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name 4395 AYERS AVE End Street Name 2001171001 Run ID Ayers Ave 81 ID Sidewalk Width Priority feet -.26220.5 Vertical Change REF9221.5to138312 9 ft feet 2.0-3.0221.7 Cross Slope (PAR)SF18223.8to $120 $2,1421587299ft feet -.5224.9 Vertical Change SF9225.9to $75 $6381383139ft feet 3.0-4.0229.3 Cross Slope (PAR)SF34233.3to $120 $4,0801587309ft feet 2.0-3.0233.9 Cross Slope (PAR)SF63241.3to $120 $7,5481587319ft feet 2.0-3.0243.7 Cross Slope (PAR)SF31247.3to $120 $3,6721587329ft feet 2.0-3.0252.3 Cross Slope (PAR)SF9253.4to $120 $1,1221587339ft feet 2.0-3.0256.3 Cross Slope (PAR)SF115269.8to $120 $13,7701587349ft feet -.46264.8 Vertical Change REF9265.8to138314 9 ft feet 3.0-4.0272.5 Cross Slope (PAR)SF11273.8to $120 $1,3261587359ft feet 2.0-3.0274.5 Cross Slope (PAR)SF11275.8to $120 $1,3261587369ft feet 2.0-3.0281.9 Cross Slope (PAR)SF17283.9to $120 $2,0401587379ft feet 2.0-3.0288.9 Cross Slope (PAR)SF246317.8to $120 $29,4781587389ft feet318.2 Driveway359.3to165997 feet .39365.4 Vertical Change LF9366.4to $75 $6381383159ft feet -.26367.7 Vertical Change LF9368.7to $75 $6381383169ft feet 2.0-3.0369.4 Cross Slope (PAR)SF31373.0to $120 $3,6721587399ft feet .27369.6 Vertical Change REF24372.4to138317 9 ft feet -.28373.4 Vertical Change LF9374.4to $75 $6381383189ft feet .26375.6 Vertical Change REF79384.9to138319 9 ft feet 2.0-3.0376.4 Cross Slope (PAR)SF10377.6to $120 $1,2241587409ft feet 4.0-5.0379.4 Cross Slope (PAR)SF88389.8to $120 $10,6081587419ft feet 2.0-3.0390.9 Cross Slope (PAR)SF27394.1to $120 $3,2641587429ft feet 4.0-5.0394.5 Cross Slope (PAR)SF100406.3to $120 $12,0361587439ft feet 4.0-5.0409.2 Cross Slope (PAR)SF77418.2to $120 $9,1801587449ft feet 6.0-7.0419.9 Cross Slope (PAR)SF18422.0to $120 $2,1421587459ft feet 5.0-6.0423.0 Cross Slope (PAR)SF22425.6to $120 $2,6521587469ft feet 3.0-4.0425.8 Cross Slope (PAR)SF21428.3to $120 $2,5501587479ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 470 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W / N AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name 4395 AYERS AVE End Street Name 2001171001 Run ID Ayers Ave 81 ID Sidewalk Width Priority feet 2.0-3.0428.5 Cross Slope (PAR)SF13430.0to $120 $1,5301587489ft feet 5.0-6.0432.5 Cross Slope (PAR)SF50438.4to $120 $6,0181587499ft feet 3.0-4.0438.4 Cross Slope (PAR)SF20440.7to $120 $2,3461587509ft feet 4.0-5.0444.3 Cross Slope (PAR)SF31448.0to $120 $3,7741587519ft feet 2.0-3.0448.0 Cross Slope (PAR)SF133463.6to $120 $15,9121587529ft feet .48464.5 Vertical Change LF27467.7to $75 $2,0401383209ft feet 4.0-5.0465.8 Cross Slope (PAR)SF26468.9to $120 $3,1621587539ft feet .3470.5 Vertical Change LF9471.5to $75 $6381383219ft feet 3.0-4.0475.1 Cross Slope (PAR)SF78484.3to $120 $9,3841587549ft feet 2.0-3.0485.8 Cross Slope (PAR)SF82495.4to $120 $9,7921587559ft feet 2.0-3.0497.6 Cross Slope (PAR)SF129512.8to $120 $15,5041587569ft feet 1.26501.5 Vertical Change REF9502.5to138322 9 ft feet 4.0-5.0516.7 Cross Slope (PAR)SF56523.3to $120 $6,7321587579ft feet 4.0-5.0526.0 Cross Slope (PAR)SF11527.3to $120 $1,3261587589ft feet528.3 Cold Patch 37532.7to140564 9 ft feet .33529.2 Vertical Change LF23531.9to $75 $1,7211383239ft feet 5.0-6.0533.9 Cross Slope (PAR)SF128548.9to $120 $15,3001587599ft feet 3.0-4.0550.5 Cross Slope (PAR)SF45555.8to $120 $5,4061587609ft feet .38551.1 Vertical Change REF9552.1to138324 9 ft feet558.3 Cold Patch 50564.2to140565 9 ft feet 3.0-4.0566.0 Cross Slope (PAR)SF9567.0to $120 $1,0201587619ft feet 7.0-8.0568.9 Cross Slope (PAR)SF20571.2to $120 $2,3461587629ft feet 5.0-6.0574.8 Cross Slope (PAR)SF26577.9to $120 $3,1621587639ft feet 3.0-4.0578.3 Cross Slope (PAR)SF9579.3to $120 $1,0201587649ft feet 2.0-3.0583.5 Cross Slope (PAR)SF31587.2to $120 $3,7741587659ft feet .28587.3 Vertical Change LF9588.3to $75 $6381383259ft feet 3.0-4.0591.8 Cross Slope (PAR)SF11593.1to $120 $1,3261587669ft feet .28593.7 Vertical Change REF9594.7to138326 9 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 471 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W / N AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name 4395 AYERS AVE End Street Name 2001171001 Run ID Ayers Ave 81 ID Sidewalk Width Priority feet 2.0-3.0594.3 Cross Slope (PAR)SF10595.5to $120 $1,2241587679ft feet -.27596.7 Vertical Change LF9597.7to $75 $6381383279ft feet .73600.4 Vertical Change REF9601.4to138328 9 ft feet 3.0-4.0600.9 Cross Slope (PAR)SF13602.4to $120 $1,5301587689ft feet 2.0-3.0629.7 Cross Slope (PAR)SF19631.9to $120 $2,2441587699ft feet -.36633.4 Vertical Change LF9634.4to $75 $6381383299ft feet 3.0-4.0639.2 Cross Slope (PAR)SF33643.1to $120 $3,9781587709ft feet 2.0-3.0644.3 Cross Slope (PAR)SF31647.9to $120 $3,6721587719ft feet 2.0-3.0658.4 Cross Slope (PAR)SF59665.3to $120 $7,0381587729ft feet 2.0-3.0675.4 Cross Slope (PAR)SF136691.4to $120 $16,3201587739ft feet 4.0-5.0691.4 Cross Slope (PAR)SF129706.6to $120 $15,5041587749ft feet 2.0-3.0706.6 Cross Slope (PAR)SF109719.4to $120 $13,0561587759ft feet 2.0-3.0735.0 Cross Slope (PAR)SF61742.2to $120 $7,3441587769ft feet 4.0-5.0743.3 Cross Slope (PAR)SF71751.6to $120 $8,4661587779ft feet 2.0-3.0751.6 Cross Slope (PAR)SF29755.0to $120 $3,4681587789ft feet 3.11754.0 Vertical Change REF9755.0to138330 9 ft feet 4.0-5.0756.3 Cross Slope (PAR)SF10757.5to $120 $1,2241587799ft feet -.28758.9 Vertical Change REF9759.9to138331 9 ft feet 2.0-3.0759.1 Cross Slope (PAR)SF14760.8to $120 $1,7341587809ft feet .27760.8 Vertical Change REF9761.8to138332 9 ft feet -.33763.4 Vertical Change LF9764.4to $75 $6381383339ft feet .32765.7 Vertical Change LF9766.7to $75 $6381383349ft feet .27770.0 Vertical Change LF9771.0to $75 $6381383369ft feet 2.0-3.0781.8 Cross Slope (PAR)SF48787.4to $120 $5,7121587819ft feet 3.0-4.0792.3 Cross Slope (PAR)SF110805.2to $120 $13,1581587829ft feet 2.0-3.0807.9 Cross Slope (PAR)SF12809.3to $120 $1,4281587839ft feet 4.0-5.0810.3 Cross Slope (PAR)SF26813.3to $120 $3,0601587849ft feet 2.0-3.0813.4 Cross Slope (PAR)SF47818.9to $120 $5,6101587859ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 472 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W / N AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name 4395 AYERS AVE End Street Name 2001171001 Run ID Ayers Ave 81 ID Sidewalk Width Priority feet 2.0-3.0821.5 Cross Slope (PAR)SF45826.8to $120 $5,4061587869ft feet 2.0-3.0831.3 Cross Slope (PAR)SF30834.8to $120 $3,5701587879ft feet -.32849.1 Vertical Change LF9850.1to $75 $6381383379ft feet .28851.3 Vertical Change LF24854.1to $75 $1,7851383389ft feet -.29856.7 Vertical Change LF9857.7to $75 $6381383399ft feet .28858.9 Vertical Change LF9859.9to $75 $6381383409ft feet -.26861.6 Vertical Change LF9862.6to $75 $6381383419ft feet 2.0-3.0863.2 Cross Slope (PAR)SF128878.3to $120 $15,4021587889ft feet .26863.7 Vertical Change REF30867.2to138342 9 ft feet -.27869.6 Vertical Change REF9870.6to138343 9 ft feet .46879.9 Vertical Change LF9880.9to $75 $6381383449ft feet880.8 Driveway919.3to165998 feet 2.0-3.0924.4 Cross Slope (PAR)SF21926.9to $120 $2,5501587899ft feet930.7 Driveway958.5to165999 feet930.7 Driveway1116.6to166000 feet 2.0-3.0961.5 Cross Slope (Driveway)SF11962.8to $40 $4421587909ft feet 3.0-4.0966.6 Cross Slope (Driveway)SF10967.8to $40 $4081587919ft feet 2.0-3.0968.3 Cross Slope (Driveway)SF34972.3to $40 $1,3601587929ft feet 2.0-3.0978.6 Cross Slope (Driveway)SF43983.7to $40 $1,7341587939ft feet 2.0-3.0987.3 Cross Slope (Driveway)SF64994.8to $40 $2,5501587949ft feet 2.0-3.0996.9 Cross Slope (Driveway)SF1281012.0to $40 $5,1341587959ft feet 3.0-4.01015.9 Cross Slope (Driveway)SF191018.1to $40 $7481587969ft feet 2.0-3.01018.4 Cross Slope (Driveway)SF961029.7to $40 $3,8421587979ft feet .321026.8 Vertical Change REF91027.8to138345 9 ft feet .381030.8 Vertical Change REF91031.8to138346 9 ft feet .271033.9 Vertical Change REF531040.1to138347 9 ft feet 3.0-4.01038.5 Cross Slope (Driveway)SF91039.6to $40 $3741587989ft feet 5.0-6.01040.5 Cross Slope (Driveway)SF561047.1to $40 $2,2441587999ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 473 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W / N AYERS AVE Street Side BANDINI BLVD Survey Street Name Starting Street Name 4395 AYERS AVE End Street Name 2001171001 Run ID Ayers Ave 81 ID Sidewalk Width Priority feet 3.0-4.01048.7 Cross Slope (Driveway)SF521054.8to $40 $2,0741588009ft feet 4.0-5.01057.3 Cross Slope (Driveway)SF291060.7to $40 $1,1561588019ft feet 2.0-3.01066.1 Cross Slope (Driveway)SF91067.2to $40 $3741588029ft feet 2.0-3.01069.8 Cross Slope (Driveway)SF101071.0to $40 $4081588039ft feet 2.0-3.01073.2 Cross Slope (Driveway)SF1391089.5to $40 $5,5421588049ft feet 4.0-5.01090.3 Cross Slope (Driveway)SF91091.3to $40 $3401588059ft feet 2.0-3.01092.3 Cross Slope (Driveway)SF91093.3to $40 $3401588069ft feet 5.0-6.01103.1 Cross Slope (Driveway)SF481108.8to $40 $1,9381588079ft feet 3.0-4.01109.3 Cross Slope (Driveway)SF601116.3to $40 $2,3801588089ft $567,549.25TOTAL COST FOR:AYERS AVEW / N side of Starting at:BANDINI BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 474 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE AYERS AVE Street Side E 26TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161001 Run ID Ayers Ave 72.25 ID Sidewalk Width Priority feet 6.0-7.01.1 Cross Slope (PAR)SF103.3to $120 $1,1881577655ft feet 7.0-8.06.5 Cross Slope (PAR)SF2912.9to $120 $3,4561577665ft feet 7.0-8.015.7 Cross Slope (PAR)SF917.8to $120 $1,1341577675ft feet 5.0-6.018.8 Cross Slope (PAR)SF520.0to $120 $6481577685ft feet 2.0-3.021.3 Cross Slope (PAR)SF9542.3to $120 $11,3401577695ft feet21.4 Continuous Width SF522.4to $120 $5401669235ft feet -.2732.3 Vertical Change REF533.3to138085 5 ft feet38.8 Continuous Width SF539.8to $120 $5401674315ft feet -.2740.9 Vertical Change REF541.9to138086 5 ft feet 4.0-5.042.3 Cross Slope (PAR)SF1645.8to $120 $1,8901577705ft feet 2.0-3.045.8 Cross Slope (PAR)SF2451.2to $120 $2,9161577715ft feet 4.0-5.051.9 Cross Slope (PAR)SF1555.2to $120 $1,7821577725ft feet58.9 Driveway100.4to165924 feet -.2790.3 Vertical Change REF591.3to138087 5 ft feet 2.0-3.0101.3 Cross Slope (PAR)SF74117.7to $120 $8,8561577735ft feet -.33108.2 Vertical Change REF5109.2to138088 5 ft feet108.8 Continuous Width SF5109.8to $120 $5401670965ft feet 3.0-4.0121.1 Cross Slope (PAR)SF5122.2to $120 $5941577745ft feet 2.0-3.0122.2 Cross Slope (PAR)SF37130.4to $120 $4,4281577755ft feet 4.0-5.0131.6 Cross Slope (PAR)SF28137.8to $120 $3,3481577765ft feet 2.0-3.0137.8 Cross Slope (PAR)SF7139.4to $120 $8641577775ft feet 4.0-5.0140.6 Cross Slope (PAR)SF19144.8to $120 $2,2681577785ft feet144.3 Continuous Width SF5145.3to $120 $5401670975ft feet 2.0-3.0144.8 Cross Slope (PAR)SF9146.9to $120 $1,1341577795ft feet 2.0-3.0149.1 Cross Slope (PAR)SF5150.2to $120 $5941577805ft feet 4.0-5.0152.2 Cross Slope (PAR)SF35159.9to $120 $4,1581577815ft feet 2.0-3.0160.8 Cross Slope (PAR)SF14164.0to $120 $1,7281577825ft feet165.4 Continuous Width SF5166.4to $120 $5401674325ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 475 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE AYERS AVE Street Side E 26TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161001 Run ID Ayers Ave 72.25 ID Sidewalk Width Priority feet 3.0-4.0166.8 Cross Slope (PAR)SF61180.3to $120 $7,2901577835ft feet .28167.0 Vertical Change REF5168.0to138089 5 ft feet -.3170.2 Vertical Change REF5171.2to138090 5 ft feet .49177.2 Vertical Change REF5178.2to138091 5 ft feet 5.0-6.0180.3 Cross Slope (PAR)SF61193.9to $120 $7,3441577845ft feet 4.0-5.0196.4 Cross Slope (PAR)SF21201.0to $120 $2,4841577855ft feet 4.0-5.0204.8 Cross Slope (PAR)SF25210.3to $120 $2,9701577865ft feet 5.0-6.0213.1 Cross Slope (PAR)SF56225.5to $120 $6,6961577875ft feet -.27221.0 Vertical Change REF5222.0to138092 5 ft feet 3.0-4.0227.4 Cross Slope (PAR)SF38235.9to $120 $4,5901577885ft feet 5.0-6.0236.6 Cross Slope (PAR)SF5237.7to $120 $5941577895ft feet 6.0-7.0238.0 Cross Slope (PAR)SF15241.4to $120 $1,8361577905ft feet 5.0-6.0241.4 Cross Slope (PAR)SF20245.9to $120 $2,4301577915ft feet 6.0-7.0246.3 Cross Slope (PAR)SF10248.5to $120 $1,1881577925ft feet 4.0-5.0249.6 Cross Slope (PAR)SF87269.0to $120 $10,4761577935ft feet -.26263.9 Vertical Change REF5264.9to138093 5 ft feet 4.0-5.0271.9 Cross Slope (PAR)SF124299.5to $120 $14,9041577945ft feet .31294.8 Vertical Change REF5295.8to138094 5 ft feet 2.0-3.0302.3 Cross Slope (PAR)SF9304.4to $120 $1,1341577955ft feet307.3 Continuous Width SF5308.3to $120 $5401674875ft feet 4.0-5.0309.0 Cross Slope (PAR)SF5310.0to $120 $5401577965ft feet 5.0-6.0312.0 Running Slope SF6313.3to $120 $7021666115ft feet 3.0-4.0315.9 Cross Slope (PAR)SF6317.3to $120 $7561577975ft feet .27321.6 Vertical Change REF5322.6to138095 5 ft feet 4.0-5.0322.2 Cross Slope (PAR)SF9324.3to $120 $1,1341577985ft feet 3.0-4.0327.2 Cross Slope (PAR)SF55339.5to $120 $6,6421577995ft feet 5.0-6.0339.5 Cross Slope (PAR)SF47350.0to $120 $5,6701578005ft feet 3.0-4.0350.0 Cross Slope (PAR)SF5351.0to $120 $5401578015ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 476 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE AYERS AVE Street Side E 26TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161001 Run ID Ayers Ave 72.25 ID Sidewalk Width Priority feet 2.0-3.0352.1 Cross Slope (PAR)SF12354.8to $120 $1,4581578025ft feet 2.0-3.0357.3 Cross Slope (PAR)SF55369.5to $120 $6,5881578035ft feet 5.0-6.0368.3 Running Slope REF5369.3to166612 5 ft $143,532.00TOTAL COST FOR:AYERS AVENEside of Starting at:E 26TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 477 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S AYERS AVE Street Side S SUNOL DR Survey Street Name Starting Street Name 4398 AYERS AVE End Street Name 2001171123 Run ID Ayers Ave 42.75 ID Sidewalk Width Priority feet .31.4 Vertical Change REF92.4to138176 9 ft feet 3.0-4.01.5 Cross Slope (PAR)SF92.6to $120 $1,1221582439ft feet 2.0-3.09.1 Cross Slope (PAR)SF4414.3to $120 $5,3041582449ft feet18.6 Driveway42.8to165963 feet .3124.3 Vertical Change REF925.3to138177 9 ft feet 3.0-4.043.0 Cross Slope (Driveway)SF2145.5to $40 $8501582459ft feet 2.0-3.046.4 Cross Slope (PAR)SF29080.5to $120 $34,7821582469ft feet .2766.5 Vertical Change REF967.5to138178 9 ft feet 4.0-5.080.5 Cross Slope (PAR)SF4585.8to $120 $5,4061582479ft feet 5.0-6.084.3 Running Slope REF1485.9to166624 9 ft feet86.6 Driveway134.2to165964 feet .37121.7 Vertical Change REF9122.7to138179 9 ft feet 3.0-4.0135.4 Cross Slope (PAR)SF37139.7to $120 $4,3861582489ft feet 2.0-3.0145.2 Cross Slope (PAR)SF13146.7to $120 $1,5301582499ft feet 4.0-5.0147.3 Cross Slope (PAR)SF15149.1to $120 $1,8361582509ft feet 3.0-4.0152.3 Cross Slope (PAR)SF20154.6to $120 $2,3461582519ft feet 3.0-4.0156.9 Cross Slope (PAR)SF63164.3to $120 $7,5481582529ft feet 2.0-3.0164.3 Cross Slope (PAR)SF82173.9to $120 $9,7921582539ft feet 2.0-3.0176.0 Cross Slope (PAR)SF10177.2to $120 $1,2241582549ft feet 2.0-3.0180.2 Cross Slope (PAR)SF17182.2to $120 $2,0401582559ft feet 2.0-3.0188.1 Cross Slope (PAR)SF215213.4to $120 $25,8061582569ft feet 2.0-3.0219.1 Cross Slope (PAR)SF165238.5to $120 $19,7881582579ft feet 3.0-4.0241.3 Cross Slope (PAR)SF85251.3to $120 $10,2001582589ft feet 2.49250.3 Vertical Change REF9251.3to138180 9 ft feet 2.0-3.0252.9 Cross Slope (PAR)SF241281.2to $120 $28,8661582599ft feet 2.0-3.0284.8 Cross Slope (PAR)SF9285.8to $120 $1,0201582609ft feet 2.0-3.0289.3 Cross Slope (PAR)SF82298.9to $120 $9,7921582619ft feet 3.0-4.0304.3 Cross Slope (PAR)SF97315.7to $120 $11,6281582629ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 478 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S AYERS AVE Street Side S SUNOL DR Survey Street Name Starting Street Name 4398 AYERS AVE End Street Name 2001171123 Run ID Ayers Ave 42.75 ID Sidewalk Width Priority feet 4.0-5.0318.1 Cross Slope (PAR)SF151335.9to $120 $18,1561582639ft feet -.35335.1 Vertical Change REF9336.1to138181 9 ft feet 5.0-6.0338.0 Cross Slope (PAR)SF24340.8to $120 $2,8561582649ft feet .26339.4 Vertical Change REF9340.4to138182 9 ft feet 3.0-4.0342.8 Cross Slope (PAR)SF11344.1to $120 $1,3261582659ft feet 2.0-3.0344.1 Cross Slope (PAR)SF255374.1to $120 $30,6001582669ft feet 5.0-6.0371.7 Running Slope REF20374.1to166625 9 ft $238,204.00TOTAL COST FOR:AYERS AVESside of Starting at:S SUNOL DR October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 479 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE AYERS AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161006 Run ID Ayers Ave 98.25 ID Sidewalk Width Priority feet 4.0-5.01.6 Cross Slope (PAR)SF7618.5to $120 $9,1261577285ft feet 2.0-3.018.5 Cross Slope (PAR)SF1922.8to $120 $2,3221577295ft feet 4.0-5.023.8 Cross Slope (PAR)SF1026.1to $120 $1,2421577305ft feet 4.0-5.028.8 Cross Slope (PAR)SF7545.4to $120 $8,9641577315ft feet31.3 Continuous Width SF432.3to $120 $5401671695ft feet 5.0-6.049.6 Cross Slope (PAR)SF3056.3to $120 $3,6181577325ft feet 5.0-6.058.6 Cross Slope (PAR)SF3165.4to $120 $3,6721577335ft feet63.8 Continuous Width SF564.8to $120 $5401674455ft feet 3.0-4.065.4 Cross Slope (PAR)SF3072.0to $120 $3,5641577345ft feet 3.0-4.076.2 Cross Slope (PAR)SF3283.3to $120 $3,8341577355ft feet 2.0-3.086.8 Cross Slope (PAR)SF1991.1to $120 $2,3221577365ft feet 4.0-5.092.3 Cross Slope (PAR)SF102115.0to $120 $12,2581577375ft feet 3.0-4.0117.3 Cross Slope (PAR)SF50128.3to $120 $5,9401577385ft feet 3.0-4.0136.5 Cross Slope (PAR)SF31143.4to $120 $3,7261577395ft feet 2.0-3.0150.8 Cross Slope (PAR)SF6152.1to $120 $7021577405ft feet 4.0-5.0153.8 Cross Slope (PAR)SF61167.3to $120 $7,2901577415ft feet 1.16154.5 Vertical Change REF5155.5to138079 5 ft feet .36160.9 Vertical Change REF5161.9to138080 5 ft feet 2.0-3.0168.3 Cross Slope (PAR)SF18172.4to $120 $2,2141577425ft feet 4.0-5.0174.6 Cross Slope (PAR)SF36182.5to $120 $4,2661577435ft feet 2.0-3.0183.0 Cross Slope (PAR)SF33190.3to $120 $3,9421577445ft feet 3.0-4.0194.1 Cross Slope (PAR)SF31200.9to $120 $3,6721577455ft feet -.3200.1 Vertical Change REF5201.1to138081 5 ft feet 5.0-6.0202.6 Cross Slope (PAR)SF34210.1to $120 $4,0501577465ft feet 3.0-4.0210.3 Cross Slope (PAR)SF8212.1to $120 $9721577475ft feet 5.0-6.0214.0 Cross Slope (PAR)SF7215.5to $120 $8101577485ft feet 6.0-7.0215.5 Cross Slope (PAR)SF14218.6to $120 $1,6741577495ft feet 5.0-6.0218.8 Cross Slope (PAR)SF22223.7to $120 $2,6461577505ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 480 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE AYERS AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161006 Run ID Ayers Ave 98.25 ID Sidewalk Width Priority feet 5.0-6.0227.9 Cross Slope (PAR)SF5229.0to $120 $5941577515ft feet 6.0-7.0230.1 Cross Slope (PAR)SF5231.3to $120 $6481577525ft feet 5.0-6.0231.3 Cross Slope (PAR)SF18235.2to $120 $2,1061577535ft feet 4.0-5.0239.3 Cross Slope (PAR)SF92259.8to $120 $11,0701577545ft feet 4.0-5.0263.3 Cross Slope (PAR)SF86282.5to $120 $10,3681577555ft feet271.3 Continuous Width SF5272.3to $120 $5401671295ft feet278.8 Continuous Width SF5279.8to $120 $5401674855ft feet 8.0-9.0284.9 Cross Slope (PAR)SF13287.8to $120 $1,5661577565ft feet 4.0-5.0288.7 Cross Slope (PAR)SF14291.8to $120 $1,6741577575ft feet291.3 Continuous Width SF5292.3to $120 $5401674305ft feet 2.0-3.0295.0 Cross Slope (PAR)SF17298.8to $120 $2,0521577585ft feet 4.0-5.0298.9 Cross Slope (PAR)SF31305.7to $120 $3,6721577595ft feet .51306.2 Vertical Change SF5307.2to $75 $3381380835ft feet 5.0-6.0308.8 Cross Slope (PAR)SF73325.0to $120 $8,7481577605ft feet 5.0-6.0327.6 Cross Slope (PAR)SF24332.9to $120 $2,8621577615ft feet 5.0-6.0331.1 Running Slope REF5332.3to166610 5 ft feet 3.0-4.0333.4 Cross Slope (PAR)SF43342.9to $120 $5,1301577625ft feet333.4 Continuous Width SF5334.4to $120 $5401670955ft feet337.7 Continuous Width SF5338.7to $120 $5401674865ft feet .28341.4 Vertical Change REF5342.4to138084 5 ft feet 2.0-3.0343.3 Cross Slope (PAR)SF11345.8to $120 $1,3501577635ft feet 6.0-7.0347.3 Cross Slope (PAR)SF7348.8to $120 $8101577645ft $149,593.50TOTAL COST FOR:AYERS AVENEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 481 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW AYERS AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 26TH ST End Street Name 2001161020 Run ID Ayers Ave 67.25 ID Sidewalk Width Priority feet 5.0-6.04.6 Running Slope SF85.7to $120 $9901666068ft feet 3.0-4.013.3 Cross Slope (PAR)SF9225.5to $120 $10,9801576558ft feet 2.0-3.026.0 Cross Slope (PAR)SF3330.4to $120 $3,9601576568ft feet 4.0-5.030.8 Cross Slope (PAR)SF3235.0to $120 $3,7801576578ft feet 3.0-4.037.1 Cross Slope (PAR)SF2039.8to $120 $2,4301576588ft feet 2.0-3.039.8 Cross Slope (PAR)SF8150.6to $120 $9,7201576598ft feet 4.0-5.052.1 Cross Slope (PAR)SF6160.2to $120 $7,2901576608ft feet 3.0-4.063.1 Cross Slope (PAR)SF4368.8to $120 $5,1301576618ft feet 2.0-3.070.3 Cross Slope (PAR)SF8281.2to $120 $9,8101576628ft feet 2.0-3.086.1 Cross Slope (PAR)SF5393.2to $120 $6,3901576638ft feet 2.0-3.097.0 Cross Slope (PAR)SF53104.0to $120 $6,3001576648ft feet 2.0-3.0106.8 Cross Slope (PAR)SF10108.1to $120 $1,1701576658ft feet 3.0-4.0110.8 Cross Slope (PAR)SF8111.9to $120 $9901576668ft feet 2.0-3.0122.3 Cross Slope (PAR)SF74132.2to $120 $8,9101576678ft feet139.6 Cold Patch 26143.1to140556 8 ft feet145.3 Driveway191.6to165923 feet .32147.5 Vertical Change REF8148.5to138064 8 ft feet 2.0-3.0197.0 Cross Slope (PAR)SF14198.8to $120 $1,6201576688ft feet 3.23201.4 Vertical Change SF8202.4to $75 $5631380658ft feet 2.0-3.0202.8 Cross Slope (PAR)SF11204.2to $120 $1,2601576698ft feet 2.0-3.0208.3 Cross Slope (PAR)SF323251.3to $120 $38,7001576708ft feet .37243.2 Vertical Change REF8244.2to138066 8 ft feet .55250.6 Vertical Change REF8251.6to138067 8 ft feet .98252.7 Vertical Change REF23255.8to138068 8 ft feet 2.0-3.0253.5 Cross Slope (PAR)SF16255.6to $120 $1,8901576718ft feet .58256.6 Vertical Change SF24259.8to $75 $1,8001380698ft feet 2.0-3.0259.8 Cross Slope (PAR)SF52266.7to $120 $6,2101576728ft feet .29263.3 Vertical Change REF8264.3to138070 8 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 482 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW AYERS AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 26TH ST End Street Name 2001161020 Run ID Ayers Ave 67.25 ID Sidewalk Width Priority feet 2.0-3.0271.6 Cross Slope (PAR)SF61279.8to $120 $7,3801576738ft feet -.62274.5 Vertical Change REF8275.5to138071 8 ft feet 2.0-3.0282.8 Cross Slope (PAR)SF18285.2to $120 $2,1601576748ft feet 2.0-3.0288.3 Cross Slope (PAR)SF17290.6to $120 $2,0701576758ft feet 2.0-3.0294.0 Cross Slope (PAR)SF44299.8to $120 $5,2201576768ft feet 2.0-3.0308.3 Cross Slope (PAR)SF98321.4to $120 $11,7901576778ft feet .31324.3 Vertical Change LF8325.3to $75 $5631380728ft feet 3.0-4.0327.8 Cross Slope (PAR)SF32332.1to $120 $3,8701576788ft feet 2.0-3.0332.5 Cross Slope (PAR)SF87344.1to $120 $10,4401576798ft feet 3.0-4.0346.5 Cross Slope (PAR)SF36351.3to $120 $4,3201576808ft feet 2.0-3.0352.6 Cross Slope (PAR)SF103366.3to $120 $12,3301576818ft feet 4.0-5.0366.3 Cross Slope (PAR)SF33370.7to $120 $3,9601576828ft feet 2.0-3.0371.5 Cross Slope (PAR)SF9372.7to $120 $1,0801576838ft feet 2.0-3.0377.1 Cross Slope (PAR)SF24380.3to $120 $2,8801576848ft feet 5.0-6.0379.9 Running Slope REF8381.0to166607 8 ft feet 4.0-5.0380.3 Cross Slope (PAR)SF11381.8to $120 $1,3501576858ft feet 6.0-7.0381.0 Running Slope REF11382.4to166608 8 ft $199,305.00TOTAL COST FOR:AYERS AVESWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 483 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 2939 BANDINI BLVD Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151601 Run ID Bandini Blvd 93.75 ID Sidewalk Width Priority feet 2.0-3.06.5 Cross Slope (PAR)SF118.0to $120 $1,2601540137ft feet 2.0-3.018.2 Cross Slope (PAR)SF2221.4to $120 $2,6881540147ft feet 2.0-3.023.7 Cross Slope (PAR)SF1025.1to $120 $1,1761540157ft feet .3724.5 Vertical Change REF725.5to137429 7 ft feet 2.0-3.038.0 Cross Slope (PAR)SF1139.5to $120 $1,2601540167ft feet57.6 Driveway98.5to165715 feet 3.0-4.0100.8 Cross Slope (PAR)SF43107.0to $120 $5,2081540177ft feet 4.0-5.0110.9 Cross Slope (PAR)SF60119.5to $120 $7,2241540187ft feet 3.0-4.0121.8 Cross Slope (PAR)SF14123.8to $120 $1,6801540197ft feet -.26126.8 Vertical Change REF7127.8to137430 7 ft feet 5.0-6.0127.3 Cross Slope (PAR)SF7128.3to $120 $8401540207ft feet 3.0-4.0129.8 Cross Slope (PAR)SF7130.8to $120 $8401540217ft feet 3.0-4.0133.5 Cross Slope (PAR)SF36138.7to $120 $4,3681540227ft feet 4.0-5.0142.6 Cross Slope (PAR)SF9143.9to $120 $1,0921540237ft feet 2.0-3.0148.8 Cross Slope (PAR)SF8150.0to $120 $1,0081540247ft feet 3.0-4.0152.7 Cross Slope (PAR)SF8153.9to $120 $1,0081540257ft feet 3.0-4.0156.6 Cross Slope (PAR)SF19159.3to $120 $2,2681540267ft feet 3.0-4.0174.0 Cross Slope (PAR)SF15176.1to $120 $1,7641540277ft feet176.1 Driveway194.5to165716 feet195.4 Cold Patch 73205.8to140505 7 ft feet 2.0-3.0216.2 Cross Slope (PAR)SF43222.3to $120 $5,1241540287ft feet 2.0-3.0224.5 Cross Slope (PAR)SF36229.7to $120 $4,3681540297ft feet 2.0-3.0232.6 Cross Slope (PAR)SF74243.2to $120 $8,9041540307ft feet 3.0-4.0247.3 Cross Slope (PAR)SF53254.8to $120 $6,3001540317ft feet 2.0-3.0254.8 Cross Slope (PAR)SF72265.1to $120 $8,6521540327ft feet 2.0-3.0268.7 Cross Slope (PAR)SF137288.3to $120 $16,4641540337ft feet 3.0-4.0291.0 Cross Slope (PAR)SF9292.3to $120 $1,0921540347ft feet 2.0-3.0292.6 Cross Slope (PAR)SF50299.8to $120 $6,0481540357ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 484 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 2939 BANDINI BLVD Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151601 Run ID Bandini Blvd 93.75 ID Sidewalk Width Priority feet 2.0-3.0306.7 Cross Slope (PAR)SF21309.7to $120 $2,5201540367ft feet 2.0-3.0313.0 Cross Slope (PAR)SF46319.5to $120 $5,4601540377ft feet 2.0-3.0321.8 Cross Slope (PAR)SF49328.8to $120 $5,8801540387ft feet 2.0-3.0331.2 Cross Slope (PAR)SF53338.8to $120 $6,3841540397ft feet 2.0-3.0342.0 Cross Slope (PAR)SF57350.1to $120 $6,8041540407ft feet 2.0-3.0352.3 Cross Slope (PAR)SF91365.3to $120 $10,9201540417ft feet 3.0-4.0367.7 Cross Slope (PAR)SF12369.4to $120 $1,4281540427ft feet 3.0-4.0373.5 Cross Slope (PAR)SF20376.3to $120 $2,3521540437ft feet 3.0-4.0378.8 Cross Slope (PAR)SF8380.0to $120 $1,0081540447ft feet 2.0-3.0380.2 Cross Slope (PAR)SF81391.8to $120 $9,7441540457ft feet 2.0-3.0396.1 Cross Slope (PAR)SF11397.7to $120 $1,3441540467ft feet 2.0-3.0401.8 Cross Slope (PAR)SF15404.0to $120 $1,8481540477ft feet 2.0-3.0408.5 Cross Slope (PAR)SF15410.7to $120 $1,8481540487ft feet 2.0-3.0413.5 Cross Slope (PAR)SF275452.8to $120 $33,0121540497ft feet 2.0-3.0455.8 Cross Slope (PAR)SF56463.8to $120 $6,7201540507ft feet 2.0-3.0466.8 Cross Slope (PAR)SF26470.5to $120 $3,1081540517ft feet 2.0-3.0476.8 Cross Slope (PAR)SF37482.1to $120 $4,4521540527ft feet 2.0-3.0486.2 Cross Slope (PAR)SF9487.5to $120 $1,0921540537ft feet -.32494.3 Vertical Change REF7495.3to137431 7 ft feet 2.0-3.0495.2 Cross Slope (PAR)SF71505.3to $120 $8,4841540547ft feet 2.0-3.0512.9 Cross Slope (PAR)SF36518.1to $120 $4,3681540557ft feet 2.0-3.0521.9 Cross Slope (PAR)SF17524.3to $120 $2,0161540567ft feet 3.0-4.0529.7 Cross Slope (PAR)SF42535.7to $120 $5,0401540577ft feet 2.0-3.0535.7 Cross Slope (PAR)SF50542.8to $120 $5,9641540587ft feet 4.0-5.0546.1 Cross Slope (PAR)SF15548.3to $120 $1,8481540597ft feet 2.0-3.0551.3 Cross Slope (PAR)SF26555.0to $120 $3,1081540607ft feet 2.0-3.0558.9 Cross Slope (PAR)SF45565.3to $120 $5,3761540617ft feet 4.0-5.0565.3 Cross Slope (PAR)SF19568.0to $120 $2,2681540627ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 485 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 2939 BANDINI BLVD Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151601 Run ID Bandini Blvd 93.75 ID Sidewalk Width Priority feet 2.0-3.0568.9 Cross Slope (PAR)SF38574.3to $120 $4,5361540637ft feet 4.0-5.0574.3 Cross Slope (PAR)SF41580.2to $120 $4,9561540647ft feet 2.0-3.0580.2 Cross Slope (PAR)SF10581.6to $120 $1,1761540657ft feet 2.0-3.0586.9 Cross Slope (PAR)SF55594.7to $120 $6,5521540667ft feet 2.0-3.0598.5 Cross Slope (PAR)SF99612.6to $120 $11,8441540677ft feet 2.0-3.0617.6 Cross Slope (PAR)SF24621.0to $120 $2,8561540687ft feet 2.0-3.0625.0 Cross Slope (PAR)SF53632.5to $120 $6,3001540697ft feet 6.0-7.0626.3 Running Slope REF8627.4to166508 7 ft feet 2.0-3.0635.8 Cross Slope (PAR)SF42641.8to $120 $5,0401540707ft feet 4.0-5.0644.0 Cross Slope (PAR)SF26647.7to $120 $3,1081540717ft feet 2.0-3.0661.5 Cross Slope (PAR)SF49668.5to $120 $5,8801540727ft feet 2.0-3.0674.3 Cross Slope (PAR)SF17676.7to $120 $2,0161540737ft feet 2.0-3.0680.1 Cross Slope (PAR)SF12681.8to $120 $1,4281540747ft feet 3.0-4.0693.1 Cross Slope (PAR)SF11694.6to $120 $1,2601540757ft feet 2.0-3.0695.5 Cross Slope (PAR)SF9696.8to $120 $1,0921540767ft feet 2.0-3.0701.7 Cross Slope (PAR)SF25705.3to $120 $3,0241540777ft feet 2.0-3.0708.0 Cross Slope (PAR)SF16710.3to $120 $1,9321540787ft feet 3.0-4.0713.5 Cross Slope (PAR)SF26717.2to $120 $3,1081540797ft feet 2.0-3.0717.2 Cross Slope (PAR)SF8718.4to $120 $1,0081540807ft feet 2.0-3.0727.7 Cross Slope (PAR)SF74738.2to $120 $8,8201540817ft feet 2.0-3.0746.6 Cross Slope (PAR)SF25750.2to $120 $3,0241540827ft feet 2.0-3.0752.3 Cross Slope (PAR)SF98766.3to $120 $11,7601540837ft feet 3.0-4.0769.2 Cross Slope (PAR)SF7770.2to $120 $8401540847ft feet 3.0-4.0775.3 Cross Slope (PAR)SF15777.4to $120 $1,7641540857ft feet 2.0-3.0778.3 Cross Slope (PAR)SF7779.3to $120 $8401540867ft feet 2.0-3.0786.3 Cross Slope (PAR)SF21789.3to $120 $2,5201540877ft feet 2.0-3.0792.6 Cross Slope (PAR)SF11794.2to $120 $1,3441540887ft feet 2.0-3.0798.2 Cross Slope (PAR)SF39803.8to $120 $4,7041540897ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 486 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 2939 BANDINI BLVD Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151601 Run ID Bandini Blvd 93.75 ID Sidewalk Width Priority feet 2.0-3.0814.4 Cross Slope (PAR)SF7815.4to $120 $8401540907ft feet -.42823.3 Vertical Change LF7824.3to $75 $5251374327ft feet823.9 Cold Patch 12825.6to140506 7 ft feet 3.0-4.0825.6 Cross Slope (PAR)SF10827.0to $120 $1,1761540917ft feet 3.0-4.0844.1 Cross Slope (PAR)SF99858.3to $120 $11,9281540927ft feet .32858.2 Vertical Change REF7859.2to137433 7 ft feet .29861.3 Vertical Change REF7862.3to137434 7 ft feet 2.0-3.0862.1 Cross Slope (PAR)SF106877.3to $120 $12,7681540937ft feet -.3880.9 Vertical Change REF7881.9to137435 7 ft feet 2.0-3.0881.3 Cross Slope (PAR)SF22884.5to $120 $2,6881540947ft feet884.8 Driveway920.7to165717 feet 3.0-4.0926.7 Cross Slope (PAR)SF15928.8to $120 $1,7641540957ft feet 2.0-3.0932.7 Cross Slope (PAR)SF50939.8to $120 $5,9641540967ft feet 3.0-4.0944.3 Cross Slope (PAR)SF14946.3to $120 $1,6801540977ft feet 2.0-3.0951.8 Cross Slope (PAR)SF57959.9to $120 $6,8041540987ft feet 2.0-3.0969.3 Cross Slope (PAR)SF29973.4to $120 $3,4441540997ft feet 4.0-5.0977.3 Cross Slope (PAR)SF144997.8to $120 $17,2201541007ft feet 3.0-4.01000.1 Cross Slope (PAR)SF81001.3to $120 $1,0081541017ft feet 2.0-3.01002.3 Cross Slope (PAR)SF621011.2to $120 $7,4761541027ft feet 3.0-4.01018.9 Cross Slope (PAR)SF81020.1to $120 $1,0081541037ft feet 3.0-4.01023.2 Cross Slope (PAR)SF121024.9to $120 $1,4281541047ft feet 2.0-3.01024.9 Cross Slope (PAR)SF301029.2to $120 $3,6121541057ft feet 2.0-3.01033.0 Cross Slope (PAR)SF361038.2to $120 $4,3681541067ft feet 2.0-3.01044.3 Cross Slope (PAR)SF381049.7to $120 $4,5361541077ft feet 2.0-3.01053.3 Cross Slope (PAR)SF111054.8to $120 $1,2601541087ft feet 3.0-4.01059.3 Cross Slope (PAR)SF91060.6to $120 $1,0921541097ft feet 2.0-3.01060.9 Cross Slope (PAR)SF1481082.1to $120 $17,8081541107ft feet 3.0-4.01084.3 Cross Slope (PAR)SF391089.9to $120 $4,7041541117ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 487 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 2939 BANDINI BLVD Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151601 Run ID Bandini Blvd 93.75 ID Sidewalk Width Priority feet .31095.6 Vertical Change LF71096.6to $75 $5251374377ft $453,390.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:2939 BANDINI BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 488 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side 3308 BANDINI BLVD Survey Street Name Starting Street Name CITY BOUNDARY End Street Name 2001151251 Run ID Bandini Blvd 92 ID Sidewalk Width Priority feet 3.0-4.00.8 Cross Slope (PAR)SF14319.9to $120 $17,1901550628ft feet 3.418.6 Vertical Change REF89.6to137599 8 ft feet 2.0-3.019.9 Cross Slope (PAR)SF3724.8to $120 $4,4101550638ft feet 4.0-5.024.8 Cross Slope (PAR)SF4831.2to $120 $5,7601550648ft feet 2.0-3.031.2 Cross Slope (PAR)SF19256.8to $120 $23,0401550658ft feet 4.0-5.058.2 Cross Slope (PAR)SF6566.9to $120 $7,8301550668ft feet 2.0-3.072.3 Cross Slope (PAR)SF873.3to $120 $9001550678ft feet 2.0-3.077.1 Cross Slope (PAR)SF878.2to $120 $9901550688ft feet78.2 Driveway120.8to165788 feet 3.53112.0 Vertical Change REF8113.0to137600 8 ft feet 3.35116.5 Vertical Change REF25119.8to137601 8 ft feet 2.0-3.0121.8 Cross Slope (PAR)SF116137.3to $120 $13,9501550698ft feet 3.41125.6 Vertical Change REF41131.1to137602 8 ft feet .31138.2 Vertical Change LF8139.2to $75 $5631376038ft feet138.4 Driveway191.7to165789 feet 3.59157.3 Vertical Change REF8158.3to137604 8 ft feet .28159.8 Vertical Change REF8160.8to137605 8 ft feet .26201.9 Vertical Change LF8202.9to $75 $5631376068ft feet208.6 Driveway226.5to165790 feet -.28216.0 Vertical Change REF8217.0to137607 8 ft feet 2.0-3.0228.9 Cross Slope (PAR)SF32233.2to $120 $3,8701550708ft feet 4.0-5.0235.7 Cross Slope (PAR)SF68244.7to $120 $8,1001550718ft feet 2.0-3.0244.9 Cross Slope (PAR)SF110259.6to $120 $13,2301550728ft feet 3.0-4.0263.0 Cross Slope (PAR)SF24266.2to $120 $2,8801550738ft feet 2.0-3.0266.2 Cross Slope (PAR)SF8267.3to $120 $9901550748ft feet 2.0-3.0270.5 Cross Slope (PAR)SF71280.0to $120 $8,5501550758ft feet .6277.9 Vertical Change REF8278.9to137608 8 ft feet 2.0-3.0282.3 Cross Slope (PAR)SF37287.2to $120 $4,4101550768ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 489 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side 3308 BANDINI BLVD Survey Street Name Starting Street Name CITY BOUNDARY End Street Name 2001151251 Run ID Bandini Blvd 92 ID Sidewalk Width Priority feet 4.0-5.0288.3 Cross Slope (PAR)SF49294.8to $120 $5,8501550778ft feet .58293.7 Vertical Change REF8294.7to137609 8 ft feet 2.0-3.0296.2 Cross Slope (PAR)SF18298.6to $120 $2,1601550788ft feet 2.0-3.0302.2 Cross Slope (PAR)SF8303.3to $120 $9901550798ft feet 3.0-4.0306.1 Cross Slope (PAR)SF38311.1to $120 $4,5001550808ft feet 9.0-10.0319.7 Cross Slope (PAR)SF105333.7to $120 $12,6001550818ft feet333.9 Driveway343.8to165791 feet 3.0-4.0345.9 Cross Slope (PAR)SF19348.4to $120 $2,2501550828ft feet 2.0-3.0348.8 Cross Slope (PAR)SF15350.8to $120 $1,8001550838ft feet 1.37356.8 Vertical Change SF8357.8to $75 $5631376108ft feet 2.0-3.0372.5 Cross Slope (PAR)SF16374.6to $120 $1,8901550848ft feet .27372.6 Vertical Change REF8373.6to137611 8 ft feet -.28386.4 Vertical Change REF8387.4to137612 8 ft feet 2.0-3.0387.4 Cross Slope (PAR)SF71396.9to $120 $8,5501550858ft feet .44398.5 Vertical Change LF28402.2to $75 $2,0811376138ft $160,458.75TOTAL COST FOR:BANDINI BLVDSside of Starting at:3308 BANDINI BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 490 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161608 Run ID Bandini Blvd 94 ID Sidewalk Width Priority feet .451.6 Vertical Change LF102.6to $75 $71313779110ft feet 2.0-3.05.3 Cross Slope (PAR)SF177.1to $120 $2,05215607110ft feet 2.0-3.015.1 Cross Slope (PAR)SF5821.2to $120 $6,95415607210ft feet 2.0-3.024.6 Cross Slope (PAR)SF8033.0to $120 $9,57615607310ft feet 2.0-3.047.3 Cross Slope (PAR)SF2449.8to $120 $2,85015607410ft feet 3.0-4.052.0 Cross Slope (PAR)SF1653.7to $120 $1,93815607510ft feet 3.0-4.059.3 Cross Slope (PAR)SF2061.4to $120 $2,39415607610ft feet 2.0-3.061.4 Cross Slope (PAR)SF9971.8to $120 $11,85615607710ft feet .2769.2 Vertical Change REF1070.2to137792 10 ft feet 2.0-3.084.3 Cross Slope (PAR)SF1285.6to $120 $1,48215607810ft feet .2793.5 Vertical Change LF1094.5to $75 $71313779310ft feet 2.0-3.097.0 Cross Slope (PAR)SF2199.2to $120 $2,50815607910ft feet 2.0-3.0106.0 Cross Slope (PAR)SF19108.0to $120 $2,28015608010ft feet -.28107.4 Vertical Change REF10108.4to137794 10 ft feet 2.0-3.0110.7 Cross Slope (PAR)SF130124.4to $120 $15,61815608110ft feet 2.0-3.0131.8 Cross Slope (PAR)SF48136.8to $120 $5,70015608210ft feet 2.0-3.0139.0 Cross Slope (PAR)SF31142.3to $120 $3,76215608310ft feet 2.0-3.0170.8 Cross Slope (PAR)SF21173.0to $120 $2,50815608410ft feet .86187.0 Vertical Change SF10188.0to $75 $71313779510ft feet 4.0-5.0199.8 Cross Slope (PAR)SF133213.8to $120 $15,96015608510ft feet 2.0-3.0213.9 Cross Slope (PAR)SF86222.9to $120 $10,26015608610ft feet 4.0-5.0223.8 Cross Slope (PAR)SF223247.3to $120 $26,79015608710ft feet -.26231.7 Vertical Change REF10232.7to137796 10 ft feet 4.0-5.0252.4 Cross Slope (PAR)SF82261.0to $120 $9,80415608810ft feet 3.0-4.0263.1 Cross Slope (PAR)SF44267.7to $120 $5,24415608910ft feet 2.0-3.0267.7 Cross Slope (PAR)SF22270.0to $120 $2,62215609010ft feet 2.0-3.0274.0 Cross Slope (PAR)SF31277.3to $120 $3,76215609110ft feet 2.0-3.0279.8 Cross Slope (PAR)SF14281.3to $120 $1,71015609210ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 491 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161608 Run ID Bandini Blvd 94 ID Sidewalk Width Priority feet .29284.3 Vertical Change REF10285.3to137797 10 ft feet 2.0-3.0284.8 Cross Slope (PAR)SF14286.3to $120 $1,71015609310ft feet 3.0-4.0299.0 Cross Slope (PAR)SF130312.7to $120 $15,61815609410ft feet 2.0-3.0312.7 Cross Slope (PAR)SF10313.7to $120 $1,14015609510ft feet 2.0-3.0317.9 Cross Slope (PAR)SF21320.1to $120 $2,50815609610ft feet 1.74325.1 Vertical Change SF10326.1to $75 $71313779810ft feet 2.0-3.0374.4 Cross Slope (PAR)SF23376.8to $120 $2,73615609710ft feet 2.0-3.0384.5 Cross Slope (PAR)SF73392.2to $120 $8,77815609810ft feet .5394.8 Vertical Change SF10395.8to $75 $71313779910ft feet 2.0-3.0406.0 Cross Slope (PAR)SF29409.0to $120 $3,42015609910ft feet .28411.8 Vertical Change REF10412.8to137800 10 ft feet 2.0-3.0411.9 Cross Slope (PAR)SF19413.9to $120 $2,28015610010ft feet 2.0-3.0416.2 Cross Slope (PAR)SF143431.3to $120 $17,21415610110ft feet 2.0-3.0439.7 Cross Slope (PAR)SF108451.1to $120 $12,99615610210ft feet 2.0-3.0473.6 Cross Slope (PAR)SF15475.2to $120 $1,82415610310ft feet .49480.5 Vertical Change LF10481.5to $75 $71313780110ft feet 3.0-4.0483.4 Cross Slope (PAR)SF12484.7to $120 $1,48215610410ft feet -.29485.9 Vertical Change REF10486.9to137802 10 ft feet 2.0-3.0486.0 Cross Slope (PAR)SF11487.2to $120 $1,36815610510ft feet 2.0-3.0497.5 Cross Slope (PAR)SF61503.9to $120 $7,29615610610ft feet .3506.4 Vertical Change LF10507.4to $75 $71313780310ft feet 2.0-3.0513.3 Cross Slope (PAR)SF157529.8to $120 $18,81015610710ft feet 2.0-3.0548.7 Cross Slope (PAR)SF10549.8to $120 $1,25415610810ft feet553.7 Driveway603.1to165856 feet 3.0-4.0603.1 Cross Slope (Driveway)SF34606.7to $40 $1,36815610910ft feet 2.0-3.0607.3 Cross Slope (PAR)SF35611.0to $120 $4,21815611010ft feet .49621.4 Vertical Change REF10622.4to137804 10 ft feet 5.0-6.0621.5 Cross Slope (PAR)SF27624.3to $120 $3,19215611110ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 492 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161608 Run ID Bandini Blvd 94 ID Sidewalk Width Priority feet 3.0-4.0626.7 Cross Slope (PAR)SF15628.3to $120 $1,82415611210ft feet 3.0-4.0630.8 Cross Slope (PAR)SF58636.9to $120 $6,95415611310ft feet 3.0-4.0639.3 Cross Slope (PAR)SF105650.4to $120 $12,65415611410ft feet 3.0-4.0652.9 Cross Slope (PAR)SF105664.0to $120 $12,65415611510ft feet .36665.0 Vertical Change LF10666.0to $75 $71313780510ft feet 3.0-4.0666.3 Cross Slope (PAR)SF15667.9to $120 $1,82415611610ft feet 2.0-3.0670.5 Cross Slope (PAR)SF112682.3to $120 $13,45215611710ft feet 3.0-4.0686.6 Cross Slope (PAR)SF15688.2to $120 $1,82415611810ft feet 2.0-3.0691.3 Cross Slope (PAR)SF10692.3to $120 $1,14015611910ft feet703.3 Cold Patch 28706.2to140535 10 ft feet -.48707.1 Vertical Change LF10708.1to $75 $71313780610ft feet 6.0-7.0711.5 Cross Slope (PAR)SF11712.7to $120 $1,36815612010ft feet 5.0-6.0712.7 Cross Slope (PAR)SF20714.8to $120 $2,39415612110ft feet 7.0-8.0722.4 Cross Slope (PAR)SF29725.5to $120 $3,53415612210ft feet 5.0-6.0727.1 Cross Slope (PAR)SF11728.3to $120 $1,36815612310ft feet728.5 Cold Patch 58734.6to140536 10 ft feet 4.0-5.0734.8 Cross Slope (PAR)SF112746.6to $120 $13,45215612410ft feet 3.0-4.0749.4 Cross Slope (PAR)SF26752.1to $120 $3,07815612510ft feet 2.0-3.0752.6 Cross Slope (PAR)SF16754.3to $120 $1,93815612610ft feet 2.0-3.0758.2 Cross Slope (PAR)SF11759.4to $120 $1,36815612710ft feet 4.0-5.0760.3 Cross Slope (PAR)SF156776.7to $120 $18,69615612810ft feet 2.0-3.0776.8 Cross Slope (PAR)SF11778.0to $120 $1,36815612910ft feet 2.0-3.0783.8 Cross Slope (PAR)SF137798.2to $120 $16,41615613010ft feet 3.0-4.0800.4 Cross Slope (PAR)SF95810.4to $120 $11,40015613110ft feet 2.0-3.0810.9 Cross Slope (PAR)SF32814.3to $120 $3,87615613210ft feet 3.17812.8 Vertical Change REF10813.8to137808 10 ft feet 4.0-5.0814.8 Cross Slope (PAR)SF128828.3to $120 $15,39015613310ft feet 2.0-3.0828.3 Cross Slope (PAR)SF58834.4to $120 $6,95415613410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 493 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161608 Run ID Bandini Blvd 94 ID Sidewalk Width Priority feet 3.0-4.0839.3 Cross Slope (PAR)SF56845.2to $120 $6,72615613510ft feet 3.0-4.0850.3 Cross Slope (PAR)SF14851.8to $120 $1,71015613610ft feet 3.0-4.0857.8 Cross Slope (PAR)SF48862.9to $120 $5,81415613710ft feet 2.0-3.0862.9 Cross Slope (PAR)SF11864.1to $120 $1,36815613810ft feet864.8 Cold Patch 40869.0to140537 10 ft feet -.31866.1 Vertical Change LF10867.1to $75 $71313780910ft feet 5.0-6.0872.1 Cross Slope (PAR)SF21874.3to $120 $2,50815613910ft feet .3875.2 Vertical Change LF10876.2to $75 $71313781010ft feet 5.0-6.0877.2 Cross Slope (PAR)SF10878.2to $120 $1,14015614010ft feet 4.0-5.0880.7 Cross Slope (PAR)SF105891.8to $120 $12,65415614110ft feet 2.0-3.0892.0 Cross Slope (PAR)SF27894.8to $120 $3,19215614210ft feet902.2 Driveway944.1to165857 feet 4.0-5.0944.1 Cross Slope (Driveway)SF46948.9to $40 $1,82415614310ft feet 2.0-3.0950.9 Cross Slope (PAR)SF13952.3to $120 $1,59615614410ft feet 2.0-3.0968.3 Cross Slope (PAR)SF13969.7to $120 $1,59615614510ft feet 2.0-3.0973.5 Cross Slope (PAR)SF12974.8to $120 $1,48215614610ft feet .3985.4 Vertical Change REF10986.4to137811 10 ft feet 2.0-3.0985.4 Cross Slope (PAR)SF26988.1to $120 $3,07815614710ft feet 2.0-3.0991.8 Cross Slope (PAR)SF10992.8to $120 $1,14015614810ft feet 2.0-3.0995.8 Cross Slope (PAR)SF10996.8to $120 $1,14015614910ft feet1000.7 Driveway1019.7to165858 feet .341018.7 Vertical Change REF101019.7to137812 10 ft feet 3.0-4.01020.2 Cross Slope (Driveway)SF141021.7to $40 $57015615010ft feet 2.0-3.01021.7 Cross Slope (PAR)SF1861041.3to $120 $22,34415615110ft feet .271033.0 Vertical Change REF101034.0to137813 10 ft feet 2.0-3.01043.7 Cross Slope (PAR)SF1351057.9to $120 $16,18815615210ft feet 2.0-3.01060.8 Cross Slope (PAR)SF591067.0to $120 $7,06815615310ft feet .841065.7 Vertical Change REF101066.7to137814 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 494 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161608 Run ID Bandini Blvd 94 ID Sidewalk Width Priority feet -.431073.2 Vertical Change REF101074.2to137815 10 ft feet 2.0-3.01073.5 Cross Slope (PAR)SF101074.5to $120 $1,14015615410ft feet 3.0-4.01089.7 Cross Slope (PAR)SF321093.1to $120 $3,87615615510ft feet 2.0-3.01093.3 Cross Slope (PAR)SF151094.9to $120 $1,82415615610ft feet1093.3 Continuous Width REF101094.3to167808 10 ft feet 4.0-5.01095.7 Cross Slope (PAR)SF341099.3to $120 $4,10415615710ft feet 2.0-3.01101.6 Cross Slope (PAR)SF101102.7to $120 $1,25415615810ft feet 2.0-3.01104.9 Cross Slope (PAR)SF141106.4to $120 $1,71015615910ft feet 4.0-5.01107.1 Cross Slope (PAR)SF461111.9to $120 $5,47215616010ft feet 2.0-3.01122.7 Cross Slope (PAR)SF841131.5to $120 $10,03215616110ft feet 4.0-5.01132.3 Cross Slope (PAR)SF871141.5to $120 $10,48815616210ft feet 2.0-3.01142.3 Cross Slope (PAR)SF2471168.3to $120 $29,64015616310ft feet .411147.1 Vertical Change REF101148.1to137816 10 ft feet 4.0-5.01170.4 Cross Slope (PAR)SF1801189.3to $120 $21,54615616410ft feet 2.0-3.01190.0 Cross Slope (PAR)SF541195.7to $120 $6,49815616510ft feet1195.7 Cold Patch 391199.8to140538 10 ft feet 3.0-4.01202.8 Cross Slope (PAR)SF571208.8to $120 $6,84015616610ft feet1209.1 Cold Patch 391213.2to140539 10 ft feet1209.1 Cold Patch 4771259.3to140540 10 ft feet .551210.9 Vertical Change SF101211.9to $75 $71313781710ft feet .31213.2 Vertical Change LF101214.2to $75 $71313781810ft feet1213.7 Continuous Width SF101214.7to $120 $1,14016760010ft feet 5.0-6.01219.3 Cross Slope (PAR)SF421223.7to $120 $5,01615616710ft feet 3.0-4.01223.7 Cross Slope (PAR)SF111224.9to $120 $1,36815616810ft feet 2.0-3.01225.5 Cross Slope (PAR)SF791233.8to $120 $9,46215616910ft feet 2.0-3.01241.3 Cross Slope (PAR)SF121242.6to $120 $1,48215617010ft feet .511246.1 Vertical Change SF101247.1to $75 $71313781910ft feet 2.0-3.01253.9 Cross Slope (PAR)SF231256.3to $120 $2,73615617110ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 495 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name BANDINI BLVD End Street Name 2001161608 Run ID Bandini Blvd 94 ID Sidewalk Width Priority $640,509.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:3768 BANDINI BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 496 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161652 Run ID Bandini Blvd 73 ID Sidewalk Width Priority feet 6.0-7.01.4 Cross Slope (PAR)SF132.8to $120 $1,59615582510ft feet 5.0-6.04.1 Cross Slope (PAR)SF105.2to $120 $1,25415582610ft feet 6.0-7.08.4 Cross Slope (PAR)SF1510.0to $120 $1,82415582710ft feet 5.0-6.010.3 Cross Slope (PAR)SF1712.1to $120 $2,05215582810ft feet 4.0-5.014.8 Cross Slope (PAR)SF1216.1to $120 $1,48215582910ft feet 6.0-7.019.5 Cross Slope (PAR)SF4524.2to $120 $5,35815583010ft feet .9221.3 Vertical Change REF1022.3to137747 10 ft feet 4.0-5.026.2 Cross Slope (PAR)SF7033.6to $120 $8,43615583110ft feet 4.0-5.039.4 Cross Slope (PAR)SF12652.7to $120 $15,16215583210ft feet 2.0-3.053.8 Cross Slope (PAR)SF8763.0to $120 $10,48815583310ft feet 2.0-3.066.2 Cross Slope (PAR)SF3870.2to $120 $4,56015583410ft feet70.2 Driveway90.7to165845 feet 4.0-5.093.9 Cross Slope (PAR)SF195114.4to $120 $23,37015583510ft feet 4.0-5.0117.3 Cross Slope (PAR)SF97127.5to $120 $11,62815583610ft feet 3.0-4.0130.2 Cross Slope (PAR)SF28133.1to $120 $3,30615583710ft feet 2.0-3.0133.1 Cross Slope (PAR)SF10134.2to $120 $1,25415583810ft feet 3.0-4.0141.7 Cross Slope (PAR)SF54147.4to $120 $6,49815583910ft feet 2.0-3.0156.9 Cross Slope (PAR)SF22159.2to $120 $2,62215584010ft feet 3.0-4.0166.7 Cross Slope (PAR)SF15168.3to $120 $1,82415584110ft feet 2.0-3.0169.0 Cross Slope (PAR)SF126182.3to $120 $15,16215584210ft feet 4.0-5.0182.8 Cross Slope (PAR)SF86191.8to $120 $10,26015584310ft feet .8191.4 Vertical Change REF10192.4to137748 10 ft feet 2.0-3.0192.2 Cross Slope (PAR)SF39196.3to $120 $4,67415584410ft feet 4.0-5.0197.5 Cross Slope (PAR)SF183216.8to $120 $22,00215584510ft feet 2.76199.7 Vertical Change REF10200.7to137749 10 ft feet 2.41203.5 Vertical Change REF10204.5to137750 10 ft feet 2.07207.7 Vertical Change REF10208.7to137751 10 ft feet 3.0-4.0219.2 Cross Slope (PAR)SF49224.4to $120 $5,92815584610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 497 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161652 Run ID Bandini Blvd 73 ID Sidewalk Width Priority feet 2.0-3.0224.4 Cross Slope (PAR)SF56230.3to $120 $6,72615584710ft feet .32228.1 Vertical Change REF10229.1to137752 10 ft feet 3.0-4.0236.3 Cross Slope (PAR)SF106247.5to $120 $12,76815584810ft feet 3.2237.6 Vertical Change REF10238.6to137753 10 ft feet 2.0-3.0253.4 Cross Slope (PAR)SF138267.9to $120 $16,53015584910ft feet 3.68256.1 Vertical Change REF10257.1to137754 10 ft feet -.3272.8 Vertical Change REF10273.8to137755 10 ft feet 2.0-3.0273.7 Cross Slope (PAR)SF11274.9to $120 $1,36815585010ft feet .26280.1 Vertical Change LF10281.1to $75 $71313775610ft feet 3.0-4.0282.8 Cross Slope (PAR)SF10283.9to $120 $1,25415585110ft feet 2.0-3.0286.5 Cross Slope (PAR)SF174304.8to $120 $20,86215585210ft feet 2.0-3.0314.2 Cross Slope (PAR)SF29317.3to $120 $3,53415585310ft feet .32316.8 Vertical Change REF10317.8to137757 10 ft feet -.26321.5 Vertical Change LF10322.5to $75 $71313775810ft feet 3.0-4.0325.0 Cross Slope (PAR)SF14326.5to $120 $1,71015585410ft feet 2.0-3.0327.4 Cross Slope (PAR)SF17329.2to $120 $2,05215585510ft feet 2.0-3.0339.3 Cross Slope (PAR)SF97349.5to $120 $11,62815585610ft feet 4.0-5.0352.5 Cross Slope (PAR)SF12353.8to $120 $1,48215585710ft feet 2.0-3.0354.3 Cross Slope (PAR)SF15355.9to $120 $1,82415585810ft feet 2.0-3.0362.3 Cross Slope (PAR)SF136376.6to $120 $16,30215585910ft feet 2.0-3.0379.8 Cross Slope (PAR)SF10380.8to $120 $1,14015586010ft feet 2.0-3.0386.3 Cross Slope (PAR)SF26389.0to $120 $3,07815586110ft feet .51388.8 Vertical Change REF10389.8to137759 10 ft feet 2.0-3.0391.5 Cross Slope (PAR)SF19393.5to $120 $2,28015586210ft feet 3.0-4.0402.1 Cross Slope (PAR)SF114414.1to $120 $13,68015586310ft feet415.3 Driveway436.0to165846 feet .54424.0 Vertical Change REF10425.0to137760 10 ft feet 3.0-4.0436.0 Cross Slope (Driveway)SF21438.2to $40 $83615586410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 498 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161652 Run ID Bandini Blvd 73 ID Sidewalk Width Priority feet 2.0-3.0438.3 Cross Slope (PAR)SF108449.7to $120 $12,99615586510ft feet 2.0-3.0452.6 Cross Slope (PAR)SF41456.9to $120 $4,90215586610ft feet 2.0-3.0467.8 Cross Slope (PAR)SF93477.6to $120 $11,17215586710ft feet 3.0-4.0479.9 Cross Slope (PAR)SF39484.0to $120 $4,67415586810ft feet 2.0-3.0484.3 Cross Slope (PAR)SF252510.8to $120 $30,21015586910ft feet 2.0-3.0517.1 Cross Slope (PAR)SF58523.2to $120 $6,95415587010ft feet 2.0-3.0528.6 Cross Slope (PAR)SF38532.6to $120 $4,56015587110ft feet 4.0-5.0542.6 Cross Slope (PAR)SF67549.6to $120 $7,98015587210ft feet 4.0-5.0552.8 Cross Slope (PAR)SF66559.7to $120 $7,86615587310ft feet 2.0-3.0561.3 Cross Slope (PAR)SF49566.5to $120 $5,92815587410ft feet 4.0-5.0566.8 Cross Slope (PAR)SF49572.0to $120 $5,92815587510ft feet 3.0-4.0575.3 Cross Slope (PAR)SF67582.4to $120 $8,09415587610ft feet 5.0-6.0583.8 Cross Slope (PAR)SF14585.3to $120 $1,71015587710ft feet .72585.8 Vertical Change REF10586.8to137761 10 ft feet 3.0-4.0586.8 Cross Slope (PAR)SF31590.1to $120 $3,76215587810ft feet 4.0-5.0592.9 Cross Slope (PAR)SF134607.0to $120 $16,07415587910ft feet 6.0-7.0607.8 Cross Slope (PAR)SF12609.1to $120 $1,48215588010ft feet 5.0-6.0609.6 Cross Slope (PAR)SF65616.4to $120 $7,75215588110ft feet 3.0-4.0619.4 Cross Slope (PAR)SF10620.4to $120 $1,14015588210ft feet 2.0-3.0620.4 Cross Slope (PAR)SF23622.8to $120 $2,73615588310ft feet 3.0-4.0630.0 Cross Slope (PAR)SF35633.7to $120 $4,21815588410ft feet 2.0-3.0634.0 Cross Slope (PAR)SF12635.3to $120 $1,48215588510ft feet .41635.9 Vertical Change LF10636.9to $75 $71313776210ft feet 2.0-3.0650.8 Cross Slope (PAR)SF88660.1to $120 $10,60215588610ft feet 2.0-3.0665.4 Cross Slope (PAR)SF33668.9to $120 $3,99015588710ft feet 2.0-3.0672.0 Cross Slope (PAR)SF62678.5to $120 $7,41015588810ft feet 2.0-3.0693.3 Cross Slope (PAR)SF62699.8to $120 $7,41015588910ft feet 2.0-3.0707.4 Cross Slope (PAR)SF11708.6to $120 $1,36815589010ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 499 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side 3768 BANDINI BLVD Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161652 Run ID Bandini Blvd 73 ID Sidewalk Width Priority feet 2.0-3.0711.5 Cross Slope (PAR)SF54717.2to $120 $6,49815589110ft feet 2.0-3.0736.5 Cross Slope (PAR)SF79744.8to $120 $9,46215589210ft feet 2.0-3.0752.9 Cross Slope (PAR)SF31756.2to $120 $3,76215589310ft feet 4.0-5.0756.2 Cross Slope (PAR)SF11757.4to $120 $1,36815589410ft feet 2.0-3.0759.3 Cross Slope (PAR)SF10760.4to $120 $1,25415589510ft feet 2.0-3.0772.8 Cross Slope (PAR)SF23775.2to $120 $2,73615589610ft feet 2.0-3.0784.2 Cross Slope (PAR)SF36788.0to $120 $4,33215589710ft feet 2.0-3.0790.1 Cross Slope (PAR)SF20792.2to $120 $2,39415589810ft feet 3.0-4.0801.4 Cross Slope (PAR)SF10802.5to $120 $1,25415589910ft feet 2.0-3.0803.1 Cross Slope (PAR)SF11804.3to $120 $1,36815590010ft feet 2.0-3.0812.9 Cross Slope (PAR)SF16814.6to $120 $1,93815590110ft feet 2.0-3.0818.4 Cross Slope (PAR)SF124831.4to $120 $14,82015590210ft feet 2.0-3.0833.8 Cross Slope (PAR)SF11835.0to $120 $1,36815590310ft feet 2.0-3.0838.4 Cross Slope (PAR)SF42842.8to $120 $5,01615590410ft feet 2.0-3.0845.6 Cross Slope (PAR)SF93855.4to $120 $11,17215590510ft feet 3.0-4.0858.2 Cross Slope (PAR)SF11859.4to $120 $1,36815590610ft feet 2.0-3.0863.0 Cross Slope (PAR)SF54868.7to $120 $6,49815590710ft feet 4.0-5.0868.7 Cross Slope (PAR)SF39872.8to $120 $4,67415590810ft feet872.8 Cold Patch 29875.8to140530 10 ft feet872.8 Cold Patch 561931.8to140531 10 ft feet 2.0-3.0875.8 Cross Slope (PAR)SF31879.1to $120 $3,76215590910ft feet 4.0-5.0879.1 Cross Slope (PAR)SF66886.0to $120 $7,86615591010ft feet 2.0-3.0886.0 Cross Slope (PAR)SF31889.3to $120 $3,76215591110ft feet 2.0-3.0905.6 Cross Slope (PAR)SF10906.6to $120 $1,14015591210ft feet 2.0-3.0930.0 Cross Slope (PAR)SF17931.8to $120 $2,05215591310ft $564,195.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:3768 BANDINI BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 500 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side AYERS AVE Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001161259 Run ID Bandini Blvd 91 ID Sidewalk Width Priority feet 5.0-6.00.6 Cross Slope (PAR)SF233.0to $120 $2,73615675010ft feet 6.0-7.03.3 Cross Slope (PAR)SF225.6to $120 $2,62215675110ft feet 5.0-6.07.0 Cross Slope (PAR)SF10017.5to $120 $11,97015675210ft feet 2.0-3.018.6 Cross Slope (PAR)SF1119.8to $120 $1,36815675310ft feet 4.0-5.020.5 Cross Slope (PAR)SF7528.4to $120 $9,00615675410ft feet 2.0-3.030.8 Cross Slope (PAR)SF5736.8to $120 $6,84015675510ft feet 3.0-4.040.0 Cross Slope (PAR)SF5445.7to $120 $6,49815675610ft feet 2.0-3.045.7 Cross Slope (PAR)SF9455.6to $120 $11,28615675710ft feet 3.0-4.058.2 Cross Slope (PAR)SF1159.4to $120 $1,36815675810ft feet 2.0-3.059.4 Cross Slope (PAR)SF2161.6to $120 $2,50815675910ft feet 4.0-5.062.3 Cross Slope (PAR)SF13376.3to $120 $15,96015676010ft feet 6.0-7.076.3 Cross Slope (PAR)SF1978.3to $120 $2,28015676110ft feet 5.0-6.079.2 Cross Slope (PAR)SF11591.3to $120 $13,79415676210ft feet 2.0-3.093.9 Cross Slope (PAR)SF75101.8to $120 $9,00615676310ft feet102.3 Driveway139.0to165899 feet 2.0-3.0141.5 Cross Slope (PAR)SF48146.6to $120 $5,81415676410ft feet 2.0-3.0151.2 Cross Slope (PAR)SF224174.8to $120 $26,90415676510ft feet 3.0-4.0183.0 Cross Slope (PAR)SF28185.9to $120 $3,30615676610ft feet 2.0-3.0187.7 Cross Slope (PAR)SF47192.6to $120 $5,58615676710ft feet 4.0-5.0193.7 Cross Slope (PAR)SF12195.0to $120 $1,48215676810ft feet 6.0-7.0195.4 Cross Slope (PAR)SF32198.8to $120 $3,87615676910ft feet 5.0-6.0199.3 Cross Slope (PAR)SF13200.7to $120 $1,59615677010ft feet200.7 Driveway226.1to165900 feet 2.0-3.0226.9 Cross Slope (PAR)SF123239.8to $120 $14,70615677110ft feet 2.0-3.0243.1 Cross Slope (PAR)SF78251.3to $120 $9,34815677210ft feet 4.0-5.0251.9 Cross Slope (PAR)SF99262.3to $120 $11,85615677310ft feet 2.0-3.0263.0 Cross Slope (PAR)SF206284.7to $120 $24,73815677410ft feet 3.0-4.0289.7 Cross Slope (PAR)SF35293.4to $120 $4,21815677510ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 501 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side AYERS AVE Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001161259 Run ID Bandini Blvd 91 ID Sidewalk Width Priority feet 2.0-3.0300.7 Cross Slope (PAR)SF86309.8to $120 $10,37415677610ft feet 3.0-4.0312.2 Cross Slope (PAR)SF14313.7to $120 $1,71015677710ft feet 2.0-3.0318.8 Cross Slope (PAR)SF109330.3to $120 $13,11015677810ft feet 3.0-4.0333.6 Cross Slope (PAR)SF10334.6to $120 $1,14015677910ft feet 2.0-3.0334.6 Cross Slope (PAR)SF16336.3to $120 $1,93815678010ft feet 3.0-4.0339.9 Cross Slope (PAR)SF51345.3to $120 $6,15615678110ft feet 2.0-3.0346.8 Cross Slope (PAR)SF339382.5to $120 $40,69815678210ft feet 2.0-3.0386.4 Cross Slope (PAR)SF10387.5to $120 $1,25415678310ft feet -.31396.9 Vertical Change LF10397.9to $75 $71313792610ft feet 2.0-3.0398.1 Cross Slope (PAR)SF154414.3to $120 $18,46815678410ft feet416.2 Driveway451.3to165901 feet 5.0-6.0452.3 Cross Slope (PAR)SF22454.6to $120 $2,62215678510ft feet 3.0-4.0455.7 Cross Slope (PAR)SF12457.0to $120 $1,48215678610ft feet 2.0-3.0457.7 Cross Slope (PAR)SF20459.8to $120 $2,39415678710ft feet 3.0-4.0464.4 Cross Slope (PAR)SF24466.9to $120 $2,85015678810ft feet467.3 Cold Patch 35471.0to140548 10 ft feet 2.0-3.0471.8 Cross Slope (PAR)SF10472.8to $120 $1,14015678910ft feet 3.0-4.0475.3 Cross Slope (PAR)SF14476.8to $120 $1,71015679010ft feet 2.0-3.0477.7 Cross Slope (PAR)SF91487.3to $120 $10,94415679110ft feet 3.0-4.0489.8 Cross Slope (PAR)SF247515.8to $120 $29,64015679210ft feet .51519.9 Vertical Change SF10520.9to $75 $71313792810ft feet -.39524.2 Vertical Change LF10525.2to $75 $71313792910ft feet 3.0-4.0525.9 Cross Slope (PAR)SF37529.8to $120 $4,44615679310ft feet 2.0-3.0529.8 Cross Slope (PAR)SF14531.3to $120 $1,71015679410ft feet 3.0-4.0536.8 Cross Slope (PAR)SF131550.6to $120 $15,73215679510ft feet 2.0-3.0553.3 Cross Slope (PAR)SF10554.4to $120 $1,25415679610ft feet 3.0-4.0557.9 Cross Slope (PAR)SF91567.5to $120 $10,94415679710ft feet 2.0-3.0568.9 Cross Slope (PAR)SF12570.2to $120 $1,48215679810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 502 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side AYERS AVE Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001161259 Run ID Bandini Blvd 91 ID Sidewalk Width Priority feet 3.0-4.0573.9 Cross Slope (PAR)SF10575.0to $120 $1,25415679910ft feet 2.0-3.0575.3 Cross Slope (PAR)SF87584.5to $120 $10,48815680010ft feet 3.0-4.0586.8 Cross Slope (PAR)SF15588.4to $120 $1,82415680110ft feet 2.0-3.0592.8 Cross Slope (PAR)SF39596.9to $120 $4,67415680210ft feet599.8 Driveway647.1to165902 feet599.8 Driveway1199.0to165903 feet .29603.4 Vertical Change REF10604.4to137930 10 ft feet 2.0-3.0648.2 Cross Slope (Driveway)SF52653.7to $40 $2,09015680310ft feet 2.0-3.0663.4 Cross Slope (Driveway)SF26666.1to $40 $1,02615680410ft feet 2.0-3.0682.8 Cross Slope (Driveway)SF48687.9to $40 $1,93815680510ft feet 2.0-3.0690.8 Cross Slope (Driveway)SF56696.7to $40 $2,24215680610ft feet 2.19692.0 Vertical Change REF10693.0to137931 10 ft feet 2.0-3.0699.7 Cross Slope (Driveway)SF10700.8to $40 $41815680710ft feet 2.0-3.0704.1 Cross Slope (Driveway)SF85713.0to $40 $3,38215680810ft feet 2.0-3.0716.6 Cross Slope (Driveway)SF357754.2to $40 $14,28815680910ft feet 2.0-3.0756.3 Cross Slope (Driveway)SF52761.8to $40 $2,09015681010ft feet 2.0-3.0764.6 Cross Slope (Driveway)SF67771.6to $40 $2,66015681110ft feet 2.0-3.0774.4 Cross Slope (Driveway)SF279803.8to $40 $11,17215681210ft feet 2.0-3.0812.5 Cross Slope (Driveway)SF12813.8to $40 $49415681310ft feet 2.0-3.0818.6 Cross Slope (Driveway)SF29821.7to $40 $1,17815681410ft feet .26822.2 Vertical Change REF10823.2to137932 10 ft feet 2.0-3.0827.8 Cross Slope (Driveway)SF190847.8to $40 $7,60015681510ft feet 2.0-3.0868.2 Cross Slope (Driveway)SF39872.3to $40 $1,55815681610ft feet 2.0-3.0881.7 Cross Slope (Driveway)SF29884.7to $40 $1,14015681710ft feet 2.0-3.0887.0 Cross Slope (Driveway)SF179905.8to $40 $7,14415681810ft feet 2.0-3.0909.7 Cross Slope (Driveway)SF19911.7to $40 $76015681910ft feet 2.0-3.0918.2 Cross Slope (Driveway)SF37922.1to $40 $1,48215682010ft feet 2.0-3.0925.3 Cross Slope (Driveway)SF175943.7to $40 $6,99215682110ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 503 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side AYERS AVE Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001161259 Run ID Bandini Blvd 91 ID Sidewalk Width Priority feet 2.0-3.0947.3 Cross Slope (Driveway)SF157963.8to $40 $6,27015682210ft feet 2.0-3.0967.8 Cross Slope (Driveway)SF31971.1to $40 $1,25415682310ft feet 2.0-3.0973.8 Cross Slope (Driveway)SF158990.4to $40 $6,30815682410ft feet 2.0-3.0993.2 Cross Slope (Driveway)SF44997.8to $40 $1,74815682510ft feet .26998.5 Vertical Change REF10999.5to137933 10 ft feet 2.0-3.0999.9 Cross Slope (Driveway)SF2041021.4to $40 $8,17015682610ft feet .281011.3 Vertical Change REF101012.3to137934 10 ft feet 2.0-3.01036.3 Cross Slope (Driveway)SF1601053.1to $40 $6,38415682710ft feet 2.0-3.01056.2 Cross Slope (Driveway)SF101057.3to $40 $41815682810ft feet 2.0-3.01061.0 Cross Slope (Driveway)SF971071.2to $40 $3,87615682910ft feet 2.0-3.01075.3 Cross Slope (Driveway)SF511080.7to $40 $2,05215683010ft feet 2.0-3.01086.5 Cross Slope (Driveway)SF1501102.3to $40 $6,00415683110ft feet 2.0-3.01109.2 Cross Slope (Driveway)SF951119.2to $40 $3,80015683210ft feet 2.0-3.01122.2 Cross Slope (Driveway)SF2231145.7to $40 $8,93015683310ft feet 2.0-3.01149.6 Cross Slope (Driveway)SF341153.2to $40 $1,36815683410ft feet 2.0-3.01158.3 Cross Slope (Driveway)SF1501174.1to $40 $6,00415683510ft feet 2.0-3.01180.1 Cross Slope (Driveway)SF341183.7to $40 $1,36815683610ft feet 2.0-3.01185.8 Cross Slope (Driveway)SF671192.8to $40 $2,66015683710ft feet 2.0-3.01195.0 Cross Slope (Driveway)SF131196.4to $40 $53215683810ft $551,047.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:AYERS AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 504 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side AYERS AVE Survey Street Name Starting Street Name FWY 710 RAMP End Street Name 2001170951 Run ID Bandini Blvd 92.25 ID Sidewalk Width Priority feet -.581.1 Vertical Change SF82.1to $75 $6381383489ft feet 4.0-5.06.8 Cross Slope (PAR)SF12221.2to $120 $14,6881588099ft feet 2.0-3.023.0 Cross Slope (PAR)SF2225.6to $120 $2,6521588109ft feet 2.0-3.030.6 Cross Slope (PAR)SF6838.6to $120 $8,1601588119ft feet 4.0-5.038.6 Cross Slope (PAR)SF11652.3to $120 $13,9741588129ft feet 4.0-5.054.5 Cross Slope (PAR)SF1456.2to $120 $1,7341588139ft feet 3.0-4.059.9 Cross Slope (PAR)SF1862.0to $120 $2,1421588149ft feet 2.0-3.062.3 Cross Slope (PAR)SF2665.4to $120 $3,1621588159ft feet 4.0-5.066.8 Cross Slope (PAR)SF4772.3to $120 $5,6101588169ft feet 4.0-5.078.8 Cross Slope (PAR)SF5485.2to $120 $6,5281588179ft feet 6.0-7.085.2 Cross Slope (PAR)SF2588.1to $120 $2,9581588189ft feet 3.0-4.090.2 Cross Slope (PAR)SF991.3to $120 $1,1221588199ft feet 2.0-3.091.3 Cross Slope (PAR)SF80100.7to $120 $9,5881588209ft feet 2.0-3.0102.8 Cross Slope (PAR)SF10104.0to $120 $1,2241588219ft feet 4.0-5.0104.9 Cross Slope (PAR)SF82114.6to $120 $9,8941588229ft feet 2.0-3.0116.5 Cross Slope (PAR)SF15118.3to $120 $1,8361588239ft feet 2.0-3.0121.8 Cross Slope (PAR)SF12123.2to $120 $1,4281588249ft feet 3.0-4.0128.4 Cross Slope (PAR)SF80137.8to $120 $9,5881588259ft feet 2.0-3.0139.2 Cross Slope (PAR)SF79148.5to $120 $9,4861588269ft feet 3.0-4.0154.5 Cross Slope (PAR)SF22157.1to $120 $2,6521588279ft feet 2.0-3.0157.4 Cross Slope (PAR)SF43162.4to $120 $5,1001588289ft feet 2.0-3.0165.9 Cross Slope (PAR)SF36170.1to $120 $4,2841588299ft feet 3.0-4.0174.0 Cross Slope (PAR)SF75182.8to $120 $8,9761588309ft feet185.8 Driveway258.7to166001 feet -.29257.6 Vertical Change REF9258.6to138349 9 ft feet 4.0-5.0261.2 Cross Slope (PAR)SF80270.6to $120 $9,5881588319ft feet 4.0-5.0274.3 Cross Slope (PAR)SF72282.8to $120 $8,6701588329ft feet 5.0-6.0285.9 Cross Slope (PAR)SF9286.9to $120 $1,0201588339ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 505 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side AYERS AVE Survey Street Name Starting Street Name FWY 710 RAMP End Street Name 2001170951 Run ID Bandini Blvd 92.25 ID Sidewalk Width Priority feet 7.0-8.0290.3 Cross Slope (PAR)SF19292.5to $120 $2,2441588349ft feet 4.0-5.0293.5 Cross Slope (PAR)SF28296.8to $120 $3,3661588359ft feet 4.0-5.0299.3 Cross Slope (PAR)SF16301.2to $120 $1,9381588369ft feet 4.0-5.0304.0 Cross Slope (PAR)SF13305.5to $120 $1,5301588379ft feet 4.0-5.0309.1 Cross Slope (PAR)SF23311.8to $120 $2,7541588389ft feet 2.0-3.0314.0 Cross Slope (PAR)SF86324.1to $120 $10,3021588399ft feet 1.04324.8 Vertical Change SF9325.8to $75 $6381383509ft feet 2.0-3.0327.7 Cross Slope (PAR)SF11329.0to $120 $1,3261588409ft feet 5.0-6.0327.8 Running Slope REF10329.0to166631 9 ft feet329.0 Driveway354.4to166002 feet .52340.6 Vertical Change REF9341.6to138351 9 ft feet 3.0-4.0357.1 Cross Slope (PAR)SF18359.2to $120 $2,1421588419ft feet 3.0-4.0361.8 Cross Slope (PAR)SF9362.9to $120 $1,1221588429ft feet 3.0-4.0365.6 Cross Slope (PAR)SF52371.7to $120 $6,2221588439ft feet -.31370.3 Vertical Change REF9371.3to138352 9 ft feet 3.0-4.0378.0 Cross Slope (PAR)SF11379.3to $120 $1,3261588449ft feet 2.0-3.0381.6 Cross Slope (PAR)SF9382.7to $120 $1,1221588459ft feet 6.0-7.0389.6 Cross Slope (PAR)SF24392.4to $120 $2,8561588469ft feet 5.0-6.0393.7 Cross Slope (PAR)SF17395.7to $120 $2,0401588479ft feet 3.0-4.0398.4 Cross Slope (PAR)SF24401.2to $120 $2,8561588489ft feet 2.0-3.0402.3 Cross Slope (PAR)SF13403.8to $120 $1,5301588499ft feet404.5 Driveway447.9to166003 feet .45437.2 Vertical Change REF9438.2to138353 9 ft feet 3.0-4.0447.9 Cross Slope (Driveway)SF52454.0to $40 $2,0741588509ft feet -.29449.9 Vertical Change REF9450.9to138355 9 ft $194,089.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:AYERS AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 506 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side BANDINI BLVD Survey Street Name Starting Street Name S DOWNEY RD End Street Name 2001161615 Run ID Bandini Blvd 88 ID Sidewalk Width Priority feet 2.0-3.013.0 Cross Slope (PAR)SF1614.7to $120 $1,93815601410ft feet 2.0-3.018.2 Cross Slope (PAR)SF3321.7to $120 $3,99015601510ft feet 2.0-3.032.4 Cross Slope (PAR)SF1433.9to $120 $1,71015601610ft feet 3.0-4.041.8 Cross Slope (PAR)SF1243.1to $120 $1,48215601710ft feet 2.0-3.043.1 Cross Slope (PAR)SF21365.5to $120 $25,53615601810ft feet65.5 Cold Patch 3369.0to140532 10 ft feet69.4 Continuous Width REF1070.4to167360 10 ft feet 3.0-4.070.9 Cross Slope (PAR)SF3274.3to $120 $3,87615601910ft feet 2.0-3.074.8 Cross Slope (PAR)SF1075.9to $120 $1,25415602010ft feet 2.0-3.078.0 Cross Slope (PAR)SF18597.5to $120 $22,23015602110ft feet 2.0-3.099.6 Cross Slope (PAR)SF66106.5to $120 $7,86615602210ft feet 3.0-4.0114.0 Cross Slope (PAR)SF283143.8to $120 $33,97215602310ft feet 2.0-3.0144.6 Cross Slope (PAR)SF13146.0to $120 $1,59615602410ft feet 2.0-3.0148.3 Cross Slope (PAR)SF159165.0to $120 $19,03815602510ft feet 4.0-5.0166.6 Cross Slope (PAR)SF114178.6to $120 $13,68015602610ft feet 2.0-3.0178.6 Cross Slope (PAR)SF17180.4to $120 $2,05215602710ft feet180.7 Cold Patch 52186.2to140533 10 ft feet 1.89181.3 Vertical Change SF10182.3to $75 $71313777910ft feet 1.37183.0 Vertical Change SF10184.0to $75 $71313778010ft feet .31184.9 Vertical Change LF10185.9to $75 $71313778110ft feet187.5 Driveway238.6to165853 feet 3.0-4.0241.5 Cross Slope (PAR)SF92251.2to $120 $11,05815602810ft feet 3.0-4.0256.2 Cross Slope (PAR)SF13257.6to $120 $1,59615602910ft feet 2.0-3.0263.8 Cross Slope (PAR)SF20265.9to $120 $2,39415603010ft feet 2.0-3.0273.7 Cross Slope (PAR)SF31277.0to $120 $3,76215603110ft feet 2.0-3.0280.3 Cross Slope (PAR)SF20282.4to $120 $2,39415603210ft feet 2.0-3.0286.2 Cross Slope (PAR)SF29289.2to $120 $3,42015603310ft feet 2.0-3.0291.6 Cross Slope (PAR)SF124304.6to $120 $14,82015603410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 507 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side BANDINI BLVD Survey Street Name Starting Street Name S DOWNEY RD End Street Name 2001161615 Run ID Bandini Blvd 88 ID Sidewalk Width Priority feet 3.0-4.0306.8 Cross Slope (PAR)SF10307.9to $120 $1,25415603510ft feet 2.0-3.0308.7 Cross Slope (PAR)SF27311.5to $120 $3,19215603610ft feet 3.0-4.0315.3 Cross Slope (PAR)SF14316.8to $120 $1,71015603710ft feet 3.0-4.0325.3 Cross Slope (PAR)SF29328.4to $120 $3,53415603810ft feet329.6 Driveway373.0to165854 feet 3.0-4.0374.8 Cross Slope (PAR)SF88384.1to $120 $10,60215603910ft feet .35385.8 Vertical Change LF10386.8to $75 $71313778210ft feet 2.0-3.0389.5 Cross Slope (PAR)SF12390.8to $120 $1,48215604010ft feet 2.0-3.0394.2 Cross Slope (PAR)SF10395.3to $120 $1,25415604110ft feet 3.0-4.0407.7 Cross Slope (PAR)SF23410.1to $120 $2,73615604210ft feet 3.0-4.0414.4 Cross Slope (PAR)SF15416.0to $120 $1,82415604310ft feet 2.0-3.0416.0 Cross Slope (PAR)SF20418.1to $120 $2,39415604410ft feet 3.0-4.0421.5 Cross Slope (PAR)SF29424.6to $120 $3,53415604510ft feet 3.0-4.0428.1 Cross Slope (PAR)SF19430.1to $120 $2,28015604610ft feet 3.0-4.0433.8 Cross Slope (PAR)SF55439.6to $120 $6,61215604710ft feet 5.0-6.0447.8 Cross Slope (PAR)SF29450.9to $120 $3,53415604810ft feet -.47449.5 Vertical Change REF10450.5to137783 10 ft feet 3.0-4.0451.3 Cross Slope (PAR)SF33454.8to $120 $3,99015604910ft feet455.6 Driveway499.8to165855 feet 3.0-4.0500.4 Cross Slope (Driveway)SF87509.6to $40 $3,49615605010ft feet 5.0-6.0509.8 Cross Slope (PAR)SF81518.3to $120 $9,69015605110ft feet 2.0-3.0522.8 Cross Slope (PAR)SF102533.5to $120 $12,19815605210ft feet .57536.1 Vertical Change SF10537.1to $75 $71313778410ft feet 2.0-3.0538.8 Cross Slope (PAR)SF28541.7to $120 $3,30615605310ft feet -.35540.0 Vertical Change REF10541.0to137785 10 ft feet 3.0-4.0546.7 Cross Slope (PAR)SF16548.4to $120 $1,93815605410ft feet 2.0-3.0548.4 Cross Slope (PAR)SF42552.8to $120 $5,01615605510ft feet 4.0-5.0553.5 Cross Slope (PAR)SF13554.9to $120 $1,59615605610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 508 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side BANDINI BLVD Survey Street Name Starting Street Name S DOWNEY RD End Street Name 2001161615 Run ID Bandini Blvd 88 ID Sidewalk Width Priority feet557.8 Cold Patch 84566.6to140534 10 ft feet -.37559.1 Vertical Change LF10560.1to $75 $71313778610ft feet 3.0-4.0569.8 Cross Slope (PAR)SF25572.4to $120 $2,96415605710ft feet 3.0-4.0574.8 Cross Slope (PAR)SF14576.3to $120 $1,71015605810ft feet 2.0-3.0576.3 Cross Slope (PAR)SF17578.1to $120 $2,05215605910ft feet 2.0-3.0583.6 Cross Slope (PAR)SF126596.9to $120 $15,16215606010ft feet 2.0-3.0599.0 Cross Slope (PAR)SF20601.1to $120 $2,39415606110ft feet 3.0-4.0605.3 Cross Slope (PAR)SF60611.6to $120 $7,18215606210ft feet 2.0-3.0612.5 Cross Slope (PAR)SF46617.3to $120 $5,47215606310ft feet 3.0-4.0620.1 Cross Slope (PAR)SF194640.5to $120 $23,25615606410ft feet .69632.1 Vertical Change REF10633.1to137787 10 ft feet 5.0-6.0643.2 Cross Slope (PAR)SF33646.7to $120 $3,99015606510ft feet 2.0-3.0648.6 Cross Slope (PAR)SF10649.7to $120 $1,25415606610ft feet 2.0-3.0653.0 Cross Slope (PAR)SF20655.1to $120 $2,39415606710ft feet .28663.6 Vertical Change LF10664.6to $75 $71313778810ft feet 2.0-3.0666.5 Cross Slope (PAR)SF15668.1to $120 $1,82415606810ft feet -.67668.1 Vertical Change REF10669.1to137789 10 ft feet 4.0-5.0672.0 Cross Slope (PAR)SF22674.3to $120 $2,62215606910ft feet 2.0-3.0677.3 Cross Slope (PAR)SF38681.3to $120 $4,56015607010ft feet -.32677.9 Vertical Change REF10678.9to137790 10 ft $348,659.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:BANDINI BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 509 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side BONNIE BEACH PL Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161319 Run ID Bandini Blvd 66.25 ID Sidewalk Width Priority feet 3.0-4.00.4 Cross Slope (PAR)SF859.3to $120 $10,14615665910ft feet 3.0-4.011.8 Cross Slope (PAR)SF9221.5to $120 $11,05815666010ft feet 2.0-3.022.5 Cross Slope (PAR)SF2725.3to $120 $3,19215666110ft feet 4.0-5.028.1 Cross Slope (PAR)SF1229.4to $120 $1,48215666210ft feet 4.0-5.031.8 Cross Slope (PAR)SF8340.5to $120 $9,91815666310ft feet 2.0-3.040.8 Cross Slope (PAR)SF1342.2to $120 $1,59615666410ft feet 3.0-4.066.8 Cross Slope (PAR)SF2269.1to $120 $2,62215666510ft feet 3.0-4.072.9 Cross Slope (PAR)SF2475.4to $120 $2,85015666610ft feet 2.0-3.076.0 Cross Slope (PAR)SF3880.0to $120 $4,56015666710ft feet 2.0-3.082.7 Cross Slope (PAR)SF1384.1to $120 $1,59615666810ft feet 2.0-3.090.4 Cross Slope (PAR)SF4294.8to $120 $5,01615666910ft feet 2.0-3.097.7 Cross Slope (PAR)SF48102.7to $120 $5,70015667010ft feet 4.0-5.0103.8 Cross Slope (PAR)SF58109.9to $120 $6,95415667110ft feet 2.0-3.0109.9 Cross Slope (PAR)SF44114.5to $120 $5,24415667210ft feet 2.0-3.0117.6 Cross Slope (PAR)SF19119.6to $120 $2,28015667310ft feet 2.0-3.0122.7 Cross Slope (PAR)SF65129.5to $120 $7,75215667410ft feet 2.0-3.0134.9 Cross Slope (PAR)SF56140.8to $120 $6,72615667510ft feet 4.0-5.0143.0 Cross Slope (PAR)SF11144.2to $120 $1,36815667610ft feet147.5 Driveway200.2to165889 feet 4.0-5.0200.2 Cross Slope (Driveway)SF12201.5to $40 $49415667710ft feet 2.0-3.0204.2 Cross Slope (PAR)SF54209.9to $120 $6,49815667810ft feet209.9 Cold Patch 29212.9to140546 10 ft feet 3.0-4.0213.1 Cross Slope (PAR)SF16214.8to $120 $1,93815667910ft feet -.34214.3 Vertical Change REF10215.3to137913 10 ft feet 2.0-3.0216.3 Cross Slope (PAR)SF19218.3to $120 $2,28015668010ft feet 2.0-3.0224.4 Cross Slope (PAR)SF83233.1to $120 $9,91815668110ft feet 2.0-3.0235.8 Cross Slope (PAR)SF24238.3to $120 $2,85015668210ft feet 3.0-4.0242.5 Cross Slope (PAR)SF24245.0to $120 $2,85015668310ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 510 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side BONNIE BEACH PL Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161319 Run ID Bandini Blvd 66.25 ID Sidewalk Width Priority feet 2.0-3.0245.8 Cross Slope (PAR)SF123258.7to $120 $14,70615668410ft feet 4.0-5.0258.7 Cross Slope (PAR)SF30261.9to $120 $3,64815668510ft feet 2.0-3.0266.3 Cross Slope (PAR)SF235291.0to $120 $28,15815668610ft feet .47295.8 Vertical Change REF10296.8to137914 10 ft feet 2.0-3.0296.8 Cross Slope (PAR)SF77304.9to $120 $9,23415668710ft feet 2.0-3.0311.3 Cross Slope (PAR)SF43315.8to $120 $5,13015668810ft feet 3.39317.4 Vertical Change SF10318.4to $75 $71313791510ft feet318.8 Driveway341.6to165890 feet 3.0-4.0342.7 Cross Slope (PAR)SF26345.4to $120 $3,07815668910ft feet 5.0-6.0348.4 Cross Slope (PAR)SF42352.8to $120 $5,01615669010ft feet .29350.2 Vertical Change LF10351.2to $75 $71313791610ft feet 3.0-4.0354.3 Cross Slope (PAR)SF158370.9to $120 $18,92415669110ft feet 2.0-3.0387.0 Cross Slope (PAR)SF292417.7to $120 $34,99815669210ft feet 3.0-4.0419.8 Cross Slope (PAR)SF86428.8to $120 $10,26015669310ft feet .27432.2 Vertical Change REF10433.2to137917 10 ft feet 2.0-3.0432.9 Cross Slope (PAR)SF25435.5to $120 $2,96415669410ft feet 3.0-4.0444.3 Cross Slope (PAR)SF88453.6to $120 $10,60215669510ft feet 2.0-3.0453.8 Cross Slope (PAR)SF164471.1to $120 $19,72215669610ft feet 1.53461.7 Vertical Change REF10462.7to137918 10 ft feet476.1 Driveway515.4to165891 feet .3512.8 Vertical Change REF10513.8to137919 10 ft feet 2.0-3.0519.5 Cross Slope (PAR)SF40523.7to $120 $4,78815669710ft feet525.3 Driveway563.3to165892 feet 5.0-6.0563.3 Cross Slope (Driveway)SF119575.8to $40 $4,75015669810ft feet 4.0-5.0578.3 Cross Slope (PAR)SF223601.8to $120 $26,79015669910ft feet 2.0-3.0602.3 Cross Slope (PAR)SF11603.5to $120 $1,36815670010ft feet 2.0-3.0606.2 Cross Slope (PAR)SF44610.8to $120 $5,24415670110ft feet611.5 Driveway683.8to165893 feet .32634.4 Vertical Change REF10635.4to137920 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 511 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side BONNIE BEACH PL Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161319 Run ID Bandini Blvd 66.25 ID Sidewalk Width Priority feet 4.0-5.0683.8 Cross Slope (Driveway)SF176702.3to $40 $7,03015670210ft feet 2.0-3.0702.3 Cross Slope (PAR)SF74710.1to $120 $8,89215670310ft feet 4.0-5.0711.5 Cross Slope (PAR)SF148727.1to $120 $17,78415670410ft feet 2.0-3.0727.1 Cross Slope (PAR)SF49732.3to $120 $5,92815670510ft feet 5.0-6.0733.8 Running Slope SF10734.8to $120 $1,14016656110ft feet736.5 Cold Patch 26739.2to140547 10 ft feet .26737.8 Vertical Change LF25740.4to $75 $1,85313792110ft feet 5.0-6.0741.7 Cross Slope (PAR)SF10742.8to $120 $1,25415670610ft feet 5.0-6.0745.0 Cross Slope (PAR)SF23747.4to $120 $2,73615670710ft feet748.6 Driveway775.0to165894 feet748.6 Driveway876.9to165895 feet 2.0-3.0779.5 Cross Slope (Driveway)SF26782.2to $40 $1,02615670810ft feet 4.0-5.0783.3 Cross Slope (Driveway)SF143798.3to $40 $5,70015670910ft feet 3.0-4.0804.4 Cross Slope (Driveway)SF162821.5to $40 $6,49815671010ft feet .67809.1 Vertical Change REF10810.1to137922 10 ft feet 2.0-3.0823.3 Cross Slope (Driveway)SF10824.3to $40 $38015671110ft feet 2.0-3.0831.7 Cross Slope (Driveway)SF36835.5to $40 $1,44415671210ft feet 5.0-6.0836.4 Cross Slope (Driveway)SF13837.8to $40 $53215671310ft feet 2.0-3.0843.1 Cross Slope (Driveway)SF195863.6to $40 $7,79015671410ft feet 1.26864.6 Vertical Change REF10865.6to137923 10 ft $397,679.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:BONNIE BEACH PL October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 512 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side BONNIE BEACH PL Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001171114 Run ID Bandini Blvd 36 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF656.8to $120 $7,75215830610ft feet 4.0-5.013.3 Cross Slope (PAR)SF5819.4to $120 $6,95415830710ft feet 2.0-3.021.2 Cross Slope (PAR)SF9130.8to $120 $10,94415830810ft feet .8931.8 Vertical Change SF932.8to $75 $71313819810ft feet32.3 Driveway66.9to165966 feet 3.0-4.068.8 Cross Slope (PAR)SF1570.4to $120 $1,82415830910ft feet72.8 Driveway104.0to165967 feet 3.0-4.0105.2 Cross Slope (PAR)SF66112.1to $120 $7,86615831010ft feet 2.0-3.0112.1 Cross Slope (PAR)SF156128.5to $120 $18,69615831110ft feet 2.0-3.0130.8 Cross Slope (PAR)SF14132.3to $120 $1,71015831210ft feet 4.0-5.0133.6 Cross Slope (PAR)SF36137.4to $120 $4,33215831310ft feet 3.0-4.0139.9 Cross Slope (PAR)SF86148.9to $120 $10,26015831410ft feet .5150.0 Vertical Change SF10151.0to $75 $71313819910ft feet 4.0-5.0151.9 Cross Slope (PAR)SF23154.3to $120 $2,73615831510ft feet 2.0-3.0155.8 Cross Slope (PAR)SF19157.8to $120 $2,28015831610ft feet 2.0-3.0166.2 Cross Slope (PAR)SF32169.6to $120 $3,87615831710ft feet 4.0-5.0174.0 Cross Slope (PAR)SF48179.1to $120 $5,81415831810ft feet 2.0-3.0180.8 Cross Slope (PAR)SF48185.8to $120 $5,70015831910ft feet 4.0-5.0186.3 Cross Slope (PAR)SF32189.7to $120 $3,87615832010ft feet 2.0-3.0191.3 Cross Slope (PAR)SF33194.8to $120 $3,99015832110ft feet 3.0-4.0197.7 Cross Slope (PAR)SF55203.5to $120 $6,61215832210ft feet 3.0-4.0214.4 Cross Slope (PAR)SF58220.5to $120 $6,95415832310ft feet 2.0-3.0221.5 Cross Slope (PAR)SF53227.1to $120 $6,38415832410ft feet 3.0-4.0231.8 Cross Slope (PAR)SF10232.8to $120 $1,14015832510ft feet 2.0-3.0232.8 Cross Slope (PAR)SF43237.3to $120 $5,13015832610ft feet 2.0-3.0240.8 Cross Slope (PAR)SF12242.1to $120 $1,48215832710ft feet 2.0-3.0245.2 Cross Slope (PAR)SF103256.0to $120 $12,31215832810ft feet 2.0-3.0258.1 Cross Slope (PAR)SF67265.2to $120 $8,09415832910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 513 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side BONNIE BEACH PL Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001171114 Run ID Bandini Blvd 36 ID Sidewalk Width Priority feet 2.0-3.0287.6 Cross Slope (PAR)SF48292.7to $120 $5,81415833010ft feet 2.0-3.0302.2 Cross Slope (PAR)SF23304.6to $120 $2,73615833110ft feet 3.0-4.0307.0 Cross Slope (PAR)SF36310.8to $120 $4,33215833210ft feet324.3 Driveway358.5to165968 feet 2.65350.0 Vertical Change REF10351.0to138200 10 ft feet 2.0-3.0358.8 Cross Slope (PAR)SF50364.1to $120 $6,04215833310ft feet 4.0-5.0368.0 Cross Slope (PAR)SF26370.7to $120 $3,07815833410ft feet 2.0-3.0375.1 Cross Slope (PAR)SF35378.8to $120 $4,21815833510ft feet380.3 Driveway400.7to165969 feet380.3 Driveway587.4to165970 feet 3.53387.5 Vertical Change REF10388.5to138201 10 ft feet 2.0-3.0403.0 Cross Slope (Driveway)SF89412.4to $40 $3,57215833610ft feet 3.0-4.0416.6 Cross Slope (Driveway)SF17418.4to $40 $68415833710ft feet 2.0-3.0419.2 Cross Slope (Driveway)SF50424.5to $40 $2,01415833810ft feet 4.0-5.0430.0 Cross Slope (Driveway)SF29433.0to $40 $1,14015833910ft feet 2.0-3.0434.0 Cross Slope (Driveway)SF43438.5to $40 $1,71015834010ft feet 2.0-3.0440.6 Cross Slope (Driveway)SF45445.3to $40 $1,78615834110ft feet -.28445.0 Vertical Change REF10446.0to138202 10 ft feet 2.0-3.0457.7 Cross Slope (Driveway)SF10458.8to $40 $41815834210ft feet .41462.4 Vertical Change REF10463.4to138203 10 ft feet 2.0-3.0462.4 Cross Slope (Driveway)SF38466.4to $40 $1,52015834310ft feet 3.0-4.0468.8 Cross Slope (Driveway)SF65475.6to $40 $2,58415834410ft feet 2.0-3.0480.9 Cross Slope (Driveway)SF81489.4to $40 $3,23015834510ft feet 2.0-3.0492.6 Cross Slope (Driveway)SF117504.9to $40 $4,67415834610ft feet 2.0-3.0507.1 Cross Slope (Driveway)SF57513.1to $40 $2,28015834710ft feet 4.0-5.0513.1 Cross Slope (Driveway)SF24515.6to $40 $95015834810ft feet 2.0-3.0515.6 Cross Slope (Driveway)SF39519.7to $40 $1,55815834910ft feet 3.0-4.0524.0 Cross Slope (Driveway)SF42528.4to $40 $1,67215835010ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 514 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side BONNIE BEACH PL Survey Street Name Starting Street Name S SUNOL DR End Street Name 2001171114 Run ID Bandini Blvd 36 ID Sidewalk Width Priority feet 2.0-3.0530.7 Cross Slope (Driveway)SF15532.3to $40 $60815835110ft feet .28535.3 Vertical Change REF10536.3to138204 10 ft feet 3.0-4.0538.8 Cross Slope (Driveway)SF19540.8to $40 $76015835210ft feet 2.0-3.0540.8 Cross Slope (Driveway)SF10541.9to $40 $41815835310ft feet 2.0-3.0552.8 Cross Slope (Driveway)SF14554.3to $40 $57015835410ft feet 3.0-4.0564.9 Cross Slope (Driveway)SF45569.6to $40 $1,78615835510ft feet 2.0-3.0569.6 Cross Slope (Driveway)SF83578.3to $40 $3,30615835610ft feet 4.0-5.0580.0 Cross Slope (Driveway)SF39584.1to $40 $1,55815835710ft feet 2.0-3.0585.5 Cross Slope (Driveway)SF10586.5to $40 $38015835810ft $213,541.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:BONNIE BEACH PL October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 515 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side CITY BOUNDARY Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151306 Run ID Bandini Blvd 68.25 ID Sidewalk Width Priority feet 3.0-4.01.6 Cross Slope (PAR)SF548.8to $120 $6,4801549788ft feet 2.0-3.08.8 Cross Slope (PAR)SF6417.3to $120 $7,6501549798ft feet 2.0-3.022.8 Cross Slope (PAR)SF1024.1to $120 $1,1701549808ft feet 3.0-4.026.5 Cross Slope (PAR)SF1027.8to $120 $1,1701549818ft feet 5.0-6.027.9 Running Slope SF1029.2to $120 $1,1701665278ft feet29.2 Driveway46.9to165783 feet 3.0-4.048.8 Cross Slope (PAR)SF6056.8to $120 $7,2001549828ft feet 5.0-6.058.3 Cross Slope (PAR)SF2061.0to $120 $2,4301549838ft feet 3.0-4.078.5 Cross Slope (PAR)SF1981.1to $120 $2,3401549848ft feet 2.0-3.087.3 Cross Slope (PAR)SF2390.4to $120 $2,7901549858ft feet .27102.3 Vertical Change LF8103.3to $75 $5631375898ft feet 2.0-3.0106.8 Cross Slope (PAR)SF26110.3to $120 $3,1501549868ft feet .53109.1 Vertical Change REF8110.1to137590 8 ft feet 2.0-3.0138.8 Cross Slope (PAR)SF43144.6to $120 $5,2201549878ft feet 3.0-4.0148.6 Cross Slope (PAR)SF40153.9to $120 $4,7701549888ft feet 2.0-3.0153.9 Cross Slope (PAR)SF8154.9to $120 $9001549898ft feet 2.0-3.0157.2 Cross Slope (PAR)SF26160.6to $120 $3,0601549908ft feet 2.0-3.0167.1 Cross Slope (PAR)SF207194.7to $120 $24,8401549918ft feet 2.0-3.0201.8 Cross Slope (PAR)SF42207.4to $120 $5,0401549928ft feet 2.0-3.0210.1 Cross Slope (PAR)SF20212.8to $120 $2,4301549938ft feet 2.0-3.0232.8 Cross Slope (PAR)SF25236.1to $120 $2,9701549948ft feet 2.0-3.0239.3 Cross Slope (PAR)SF71248.8to $120 $8,5501549958ft feet 3.0-4.0253.4 Cross Slope (PAR)SF11254.8to $120 $1,2601549968ft feet 5.0-6.0256.1 Cross Slope (PAR)SF20258.8to $120 $2,4301549978ft feet 6.0-7.0259.8 Cross Slope (PAR)SF11261.3to $120 $1,3501549988ft feet 2.0-3.0267.1 Cross Slope (PAR)SF27270.7to $120 $3,2401549998ft feet 2.0-3.0282.9 Cross Slope (PAR)SF52289.8to $120 $6,2101550008ft feet 2.0-3.0293.8 Cross Slope (PAR)SF120309.8to $120 $14,4001550018ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 516 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side CITY BOUNDARY Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151306 Run ID Bandini Blvd 68.25 ID Sidewalk Width Priority feet 2.0-3.0314.8 Cross Slope (PAR)SF47321.0to $120 $5,5801550028ft feet 4.0-5.0321.0 Cross Slope (PAR)SF30325.0to $120 $3,6001550038ft feet 2.0-3.0328.8 Cross Slope (PAR)SF15330.8to $120 $1,8001550048ft feet 3.0-4.0337.0 Cross Slope (PAR)SF17339.2to $120 $1,9801550058ft feet 2.0-3.0339.3 Cross Slope (PAR)SF20341.9to $120 $2,3401550068ft feet 2.0-3.0345.7 Cross Slope (PAR)SF246378.5to $120 $29,5201550078ft feet 2.0-3.0382.3 Cross Slope (PAR)SF11383.7to $120 $1,2601550088ft feet 2.0-3.0391.3 Cross Slope (PAR)SF10392.6to $120 $1,1701550098ft feet 2.0-3.0397.5 Cross Slope (PAR)SF96410.3to $120 $11,5201550108ft feet 2.0-3.0418.0 Cross Slope (PAR)SF9419.2to $120 $1,0801550118ft feet 2.0-3.0448.9 Cross Slope (PAR)SF16451.0to $120 $1,8901550128ft feet 2.0-3.0455.9 Cross Slope (PAR)SF17458.1to $120 $1,9801550138ft feet478.3 Driveway533.1to165784 feet .3484.7 Vertical Change REF8485.7to137591 8 ft feet .27491.3 Vertical Change REF8492.3to137592 8 ft feet .29497.6 Vertical Change REF8498.6to137593 8 ft feet .4512.3 Vertical Change REF8513.3to137594 8 ft feet .36520.8 Vertical Change REF8521.8to137595 8 ft feet 3.0-4.0534.3 Cross Slope (PAR)SF62542.6to $120 $7,4701550148ft feet 3.0-4.0545.8 Cross Slope (PAR)SF67554.7to $120 $8,0101550158ft feet 2.0-3.0554.7 Cross Slope (PAR)SF22557.6to $120 $2,6101550168ft feet 2.0-3.0559.8 Cross Slope (PAR)SF68568.9to $120 $8,1901550178ft feet 4.0-5.0570.8 Cross Slope (PAR)SF30574.8to $120 $3,6001550188ft feet 2.0-3.0575.1 Cross Slope (PAR)SF39580.3to $120 $4,6801550198ft feet 3.0-4.0584.6 Cross Slope (PAR)SF18587.0to $120 $2,1601550208ft feet 2.0-3.0588.1 Cross Slope (PAR)SF43593.8to $120 $5,1301550218ft feet 3.0-4.0596.3 Cross Slope (PAR)SF35600.9to $120 $4,1401550228ft feet 3.0-4.0603.2 Cross Slope (PAR)SF56610.7to $120 $6,7501550238ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 517 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side CITY BOUNDARY Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151306 Run ID Bandini Blvd 68.25 ID Sidewalk Width Priority feet 2.0-3.0611.8 Cross Slope (PAR)SF24615.0to $120 $2,8801550248ft feet 2.0-3.0621.2 Cross Slope (PAR)SF132638.8to $120 $15,8401550258ft feet .31637.9 Vertical Change REF8638.9to137596 8 ft feet 4.0-5.0638.8 Cross Slope (PAR)SF64647.3to $120 $7,6501550268ft feet 2.0-3.0647.4 Cross Slope (PAR)SF37652.3to $120 $4,4101550278ft feet 2.0-3.0658.0 Cross Slope (PAR)SF33662.4to $120 $3,9601550288ft feet 3.0-4.0664.7 Cross Slope (PAR)SF56672.2to $120 $6,7501550298ft feet 2.0-3.0672.2 Cross Slope (PAR)SF86683.7to $120 $10,3501550308ft feet 3.0-4.0686.2 Cross Slope (PAR)SF51693.0to $120 $6,1201550318ft feet 2.0-3.0693.7 Cross Slope (PAR)SF10695.0to $120 $1,1701550328ft feet 4.0-5.0697.4 Cross Slope (PAR)SF236728.8to $120 $28,2601550338ft feet 2.0-3.0729.4 Cross Slope (PAR)SF28733.1to $120 $3,3301550348ft feet 4.0-5.0733.1 Cross Slope (PAR)SF38738.1to $120 $4,5001550358ft feet 2.0-3.0738.3 Cross Slope (PAR)SF32742.6to $120 $3,8701550368ft feet749.5 Driveway782.6to165785 feet -.27749.7 Vertical Change REF8750.7to137597 8 ft feet 3.0-4.0782.8 Cross Slope (Driveway)SF65791.5to $40 $2,6101550378ft feet 3.0-4.0793.8 Cross Slope (PAR)SF23796.8to $120 $2,7001550388ft feet 2.0-3.0797.8 Cross Slope (PAR)SF110812.4to $120 $13,1401550398ft feet 2.0-3.0816.1 Cross Slope (PAR)SF23819.1to $120 $2,7001550408ft feet 3.0-4.0822.4 Cross Slope (PAR)SF8823.4to $120 $9001550418ft feet 2.0-3.0828.2 Cross Slope (PAR)SF8829.3to $120 $9901550428ft feet 2.0-3.0834.6 Cross Slope (PAR)SF47840.8to $120 $5,5801550438ft feet 2.0-3.0845.1 Cross Slope (PAR)SF97858.0to $120 $11,6101550448ft feet 4.0-5.0858.8 Cross Slope (PAR)SF247891.7to $120 $29,6101550458ft feet -.26895.7 Vertical Change LF8896.7to $75 $5631375988ft feet895.7 Driveway931.1to165786 feet895.7 Driveway1106.1to165787 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 518 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side CITY BOUNDARY Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151306 Run ID Bandini Blvd 68.25 ID Sidewalk Width Priority feet 4.0-5.0932.2 Cross Slope (Driveway)SF90944.2to $40 $3,6001550468ft feet 2.0-3.0944.2 Cross Slope (Driveway)SF14946.1to $40 $5701550478ft feet 3.0-4.0954.3 Cross Slope (Driveway)SF10955.6to $40 $3901550488ft feet 3.0-4.0957.9 Cross Slope (Driveway)SF32962.1to $40 $1,2601550498ft feet 2.0-3.0962.1 Cross Slope (Driveway)SF134980.0to $40 $5,3701550508ft feet 2.0-3.0982.5 Cross Slope (Driveway)SF1531002.9to $40 $6,1201550518ft feet 4.0-5.01003.1 Cross Slope (Driveway)SF611011.2to $40 $2,4301550528ft feet 2.0-3.01011.2 Cross Slope (Driveway)SF441017.0to $40 $1,7401550538ft feet 4.0-5.01017.9 Cross Slope (Driveway)SF221020.8to $40 $8701550548ft feet 2.0-3.01021.5 Cross Slope (Driveway)SF481027.9to $40 $1,9201550558ft feet 3.0-4.01030.4 Cross Slope (Driveway)SF491037.0to $40 $1,9801550568ft feet 2.0-3.01039.0 Cross Slope (Driveway)SF1341056.8to $40 $5,3401550578ft feet 3.0-4.01060.1 Cross Slope (Driveway)SF1911085.6to $40 $7,6501550588ft feet 5.0-6.01085.6 Cross Slope (Driveway)SF781096.0to $40 $3,1201550598ft feet 3.0-4.01096.0 Cross Slope (Driveway)SF171098.3to $40 $6901550608ft feet 5.0-6.01099.6 Cross Slope (Driveway)SF491106.1to $40 $1,9501550618ft $453,735.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:CITY BOUNDARY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 519 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side CITY BOUNDARY Survey Street Name Starting Street Name PENNINGTON WY End Street Name 2001161130 Run ID Bandini Blvd 41.25 ID Sidewalk Width Priority feet 4.0-5.00.7 Cross Slope (PAR)SF13414.8to $120 $16,07415734710ft feet 2.0-3.016.6 Cross Slope (PAR)SF1318.0to $120 $1,59615734810ft feet 2.0-3.020.5 Cross Slope (PAR)SF1021.5to $120 $1,14015734910ft feet 3.0-4.025.3 Cross Slope (PAR)SF3929.4to $120 $4,67415735010ft feet 2.0-3.029.7 Cross Slope (PAR)SF1531.3to $120 $1,82415735110ft feet 3.0-4.033.6 Cross Slope (PAR)SF1735.4to $120 $2,05215735210ft feet .3233.8 Vertical Change REF1034.8to138001 10 ft feet 2.0-3.036.3 Cross Slope (PAR)SF10547.3to $120 $12,54015735310ft feet 2.0-3.050.9 Cross Slope (PAR)SF4655.7to $120 $5,47215735410ft feet 2.0-3.058.5 Cross Slope (PAR)SF19178.6to $120 $22,91415735510ft feet 4.0-5.080.0 Cross Slope (PAR)SF9189.6to $120 $10,94415735610ft feet 2.0-3.090.5 Cross Slope (PAR)SF6096.8to $120 $7,18215735710ft feet 2.0-3.0101.8 Cross Slope (PAR)SF170119.7to $120 $20,40615735810ft feet 2.0-3.0122.0 Cross Slope (PAR)SF276151.0to $120 $33,06015735910ft feet 3.0-4.0156.8 Cross Slope (PAR)SF66163.7to $120 $7,86615736010ft feet 2.0-3.0163.9 Cross Slope (PAR)SF12165.2to $120 $1,48215736110ft feet 4.0-5.0174.2 Cross Slope (PAR)SF39178.3to $120 $4,67415736210ft feet 2.0-3.0178.5 Cross Slope (PAR)SF131192.3to $120 $15,73215736310ft feet 5.0-6.0195.4 Running Slope SF36199.2to $120 $4,33216660310ft $173,964.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:CITY BOUNDARY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 520 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side EAST SIDE OF LA RIVER Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151239 Run ID Bandini Blvd 83 ID Sidewalk Width Priority feet 4.0-5.00.4 Cross Slope (PAR)SF81.4to $120 $9001551388ft feet 4.0-5.03.9 Cross Slope (PAR)SF13321.6to $120 $15,9301551398ft feet -.2610.8 Vertical Change REF811.8to137627 8 ft feet 5.0-6.025.5 Cross Slope (PAR)SF9838.5to $120 $11,7001551408ft feet 3.0-4.038.9 Cross Slope (PAR)SF11053.6to $120 $13,2301551418ft feet .4742.0 Vertical Change REF843.0to137628 8 ft feet 2.0-3.054.8 Cross Slope (PAR)SF855.9to $120 $9901551428ft feet 2.0-3.058.0 Cross Slope (PAR)SF3562.6to $120 $4,1401551438ft feet62.6 Driveway80.5to165802 feet 3.0-4.081.9 Cross Slope (PAR)SF2585.3to $120 $3,0601551448ft feet 4.0-5.087.8 Cross Slope (PAR)SF126104.6to $120 $15,1201551458ft feet 2.0-3.0104.8 Cross Slope (PAR)SF9106.0to $120 $1,0801551468ft feet 3.0-4.0108.5 Cross Slope (PAR)SF8109.6to $120 $9901551478ft feet 2.0-3.0109.6 Cross Slope (PAR)SF102123.2to $120 $12,2401551488ft feet 2.0-3.0126.0 Cross Slope (PAR)SF8127.1to $120 $9901551498ft feet 4.0-5.0130.3 Cross Slope (PAR)SF89142.2to $120 $10,7101551508ft feet142.2 Driveway169.5to165803 feet 2.0-3.0169.5 Cross Slope (Driveway)SF14171.4to $40 $5701551518ft feet 5.0-6.0174.8 Cross Slope (PAR)SF27178.4to $120 $3,2401551528ft feet 3.0-4.0178.8 Cross Slope (PAR)SF41184.3to $120 $4,9501551538ft feet 2.0-3.0185.1 Cross Slope (PAR)SF32189.3to $120 $3,7801551548ft feet 3.0-4.0191.4 Cross Slope (PAR)SF145210.7to $120 $17,3701551558ft feet 2.0-3.0211.5 Cross Slope (PAR)SF56218.9to $120 $6,6601551568ft feet 4.0-5.0218.9 Cross Slope (PAR)SF46225.0to $120 $5,4901551578ft feet 2.0-3.0225.3 Cross Slope (PAR)SF13227.0to $120 $1,5301551588ft feet 3.0-4.0229.3 Cross Slope (PAR)SF11230.7to $120 $1,2601551598ft feet 2.0-3.0233.9 Cross Slope (PAR)SF23237.0to $120 $2,7901551608ft feet 2.8234.3 Vertical Change REF8235.3to137629 8 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 521 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side EAST SIDE OF LA RIVER Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151239 Run ID Bandini Blvd 83 ID Sidewalk Width Priority feet 2.0-3.0243.1 Cross Slope (PAR)SF50249.8to $120 $6,0301551618ft feet 3.0-4.0252.4 Cross Slope (PAR)SF8253.5to $120 $9901551628ft feet 2.0-3.0253.5 Cross Slope (PAR)SF111268.3to $120 $13,3201551638ft feet 2.0-3.0276.7 Cross Slope (PAR)SF16278.8to $120 $1,8901551648ft feet 8.0-9.0287.8 Running Slope SF11289.3to $120 $1,3501665318ft feet 2.0-3.0292.0 Cross Slope (PAR)SF14293.9to $120 $1,7101551658ft feet 2.0-3.0313.4 Cross Slope (PAR)SF220342.7to $120 $26,3701551668ft feet 2.0-3.0359.8 Cross Slope (PAR)SF30363.8to $120 $3,6001551678ft feet 2.0-3.0367.2 Cross Slope (PAR)SF47373.5to $120 $5,6701551688ft feet 2.0-3.0377.2 Cross Slope (PAR)SF44383.0to $120 $5,2201551698ft feet383.0 Driveway409.7to165804 feet 3.0-4.0411.0 Cross Slope (PAR)SF29414.8to $120 $3,4201551708ft feet 2.0-3.0414.8 Cross Slope (PAR)SF20417.4to $120 $2,3401551718ft feet 4.0-5.0422.7 Cross Slope (PAR)SF14424.6to $120 $1,7101551728ft feet 5.0-6.0426.0 Running Slope SF9427.2to $120 $1,0801665328ft feet427.2 Driveway456.5to165805 feet 2.0-3.0463.3 Cross Slope (PAR)SF26466.8to $120 $3,1501551738ft feet 3.0-4.0469.8 Cross Slope (PAR)SF116485.2to $120 $13,8601551748ft feet 5.0-6.0485.4 Cross Slope (PAR)SF14487.3to $120 $1,7101551758ft feet 3.0-4.0488.8 Cross Slope (PAR)SF8489.9to $120 $9901551768ft feet 4.0-5.0492.2 Cross Slope (PAR)SF38497.3to $120 $4,5901551778ft feet .33496.0 Vertical Change REF8497.0to137630 8 ft feet 2.0-3.0501.3 Cross Slope (PAR)SF16503.4to $120 $1,8901551788ft feet 3.0-4.0508.0 Cross Slope (PAR)SF23511.1to $120 $2,7901551798ft feet 2.0-3.0511.1 Cross Slope (PAR)SF40516.4to $120 $4,7701551808ft feet 3.0-4.0522.3 Cross Slope (PAR)SF30526.3to $120 $3,6001551818ft feet 2.0-3.0526.5 Cross Slope (PAR)SF35531.2to $120 $4,2301551828ft feet 2.0-3.0535.3 Cross Slope (PAR)SF108549.7to $120 $12,9601551838ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 522 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side EAST SIDE OF LA RIVER Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151239 Run ID Bandini Blvd 83 ID Sidewalk Width Priority feet 2.0-3.0554.5 Cross Slope (PAR)SF32558.8to $120 $3,8701551848ft feet 2.0-3.0561.4 Cross Slope (PAR)SF51568.2to $120 $6,1201551858ft feet 5.0-6.0578.4 Running Slope SF14580.3to $120 $1,7101665338ft feet580.3 Driveway605.7to165806 feet 2.0-3.0605.7 Cross Slope (Driveway)SF39610.9to $40 $1,5601551868ft feet 2.0-3.0614.3 Cross Slope (PAR)SF22617.2to $120 $2,6101551878ft feet618.5 Driveway645.2to165807 feet .31632.5 Vertical Change REF8633.5to137631 8 ft feet 2.0-3.0645.5 Cross Slope (PAR)SF10646.8to $120 $1,1701551888ft feet 2.0-3.0661.8 Cross Slope (PAR)SF266697.3to $120 $31,9501551898ft feet .6675.0 Vertical Change REF8676.0to137632 8 ft feet 2.0-3.0699.4 Cross Slope (PAR)SF66708.2to $120 $7,9201551908ft feet 2.0-3.0714.2 Cross Slope (PAR)SF8715.3to $120 $9901551918ft feet 4.0-5.0716.6 Cross Slope (PAR)SF29720.5to $120 $3,5101551928ft feet 2.0-3.0720.5 Cross Slope (PAR)SF31724.6to $120 $3,6901551938ft feet728.6 Driveway753.7to165808 feet 6.0-7.0753.8 Cross Slope (Driveway)SF8754.9to $40 $3301551948ft feet 5.0-6.0755.1 Cross Slope (PAR)SF32759.3to $120 $3,7801551958ft feet 6.0-7.0760.5 Cross Slope (PAR)SF17762.8to $120 $2,0701551968ft feet 5.0-6.0765.0 Cross Slope (PAR)SF83776.1to $120 $9,9901551978ft feet 3.0-4.0777.8 Cross Slope (PAR)SF14779.7to $120 $1,7101551988ft feet .39790.1 Vertical Change LF8791.1to $75 $5631376338ft feet 3.0-4.0792.7 Cross Slope (PAR)SF77802.9to $120 $9,1801551998ft feet 5.0-6.0801.6 Running Slope REF11803.0to166534 8 ft feet803.7 Driveway847.6to165809 feet803.7 Driveway983.2to165810 feet -.39817.1 Vertical Change REF8818.1to137634 8 ft feet 5.0-6.0847.6 Cross Slope (Driveway)SF11849.0to $40 $4201552008ft feet 3.0-4.0849.9 Cross Slope (Driveway)SF95862.6to $40 $3,8101552018ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 523 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side EAST SIDE OF LA RIVER Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151239 Run ID Bandini Blvd 83 ID Sidewalk Width Priority feet 2.0-3.0862.6 Cross Slope (Driveway)SF73872.3to $40 $2,9101552028ft feet 4.0-5.0872.3 Cross Slope (Driveway)SF184896.8to $40 $7,3501552038ft feet 5.0-6.0900.3 Cross Slope (Driveway)SF11901.8to $40 $4501552048ft feet 5.0-6.0905.3 Cross Slope (Driveway)SF23908.3to $40 $9001552058ft feet 3.0-4.0908.3 Cross Slope (Driveway)SF35912.9to $40 $1,3801552068ft feet 3.0-4.0919.2 Cross Slope (Driveway)SF46925.3to $40 $1,8301552078ft feet 6.0-7.0928.0 Cross Slope (Driveway)SF9929.2to $40 $3601552088ft feet 5.0-6.0929.6 Cross Slope (Driveway)SF11931.1to $40 $4501552098ft feet 5.0-6.0932.9 Running Slope REF22935.8to166535 8 ft feet 4.0-5.0934.6 Cross Slope (Driveway)SF65943.3to $40 $2,6101552108ft feet938.4 Continuous Width REF8939.4to167342 8 ft feet 2.0-3.0949.0 Cross Slope (Driveway)SF24952.2to $40 $9601552118ft feet 2.0-3.0959.3 Cross Slope (Driveway)SF21962.1to $40 $8401552128ft feet 2.0-3.0966.8 Cross Slope (Driveway)SF10968.1to $40 $3901552138ft feet 2.0-3.0971.5 Cross Slope (Driveway)SF61979.6to $40 $2,4301552148ft feet 5.0-6.0980.4 Running Slope REF21983.2to166536 8 ft $387,772.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:EAST SIDE OF LA RIVER October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 524 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side FWY 710 RAMP Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 2001161108 Run ID Bandini Blvd 77 ID Sidewalk Width Priority feet 3.0-4.00.3 Cross Slope (PAR)SF394.4to $120 $4,67415751510ft feet 3.0-4.06.8 Cross Slope (PAR)SF118.0to $120 $1,36815751610ft feet 2.0-3.010.1 Cross Slope (PAR)SF1111.3to $120 $1,36815751710ft feet 2.0-3.013.7 Cross Slope (PAR)SF8522.6to $120 $10,14615751810ft feet 2.0-3.025.3 Cross Slope (PAR)SF1126.5to $120 $1,36815751910ft feet 2.0-3.030.1 Cross Slope (PAR)SF3033.3to $120 $3,64815752010ft feet 4.0-5.034.3 Cross Slope (PAR)SF1435.8to $120 $1,71015752110ft feet 2.0-3.039.2 Cross Slope (PAR)SF2341.6to $120 $2,73615752210ft feet 4.0-5.041.6 Cross Slope (PAR)SF4045.8to $120 $4,78815752310ft feet 2.0-3.045.8 Cross Slope (PAR)SF4250.2to $120 $5,01615752410ft feet 2.0-3.053.7 Cross Slope (PAR)SF10364.5to $120 $12,31215752510ft feet 3.0-4.066.9 Cross Slope (PAR)SF4371.4to $120 $5,13015752610ft feet 2.0-3.071.6 Cross Slope (PAR)SF11283.4to $120 $13,45215752710ft feet 2.0-3.085.9 Cross Slope (PAR)SF1687.6to $120 $1,93815752810ft feet 2.0-3.090.9 Cross Slope (PAR)SF5296.4to $120 $6,27015752910ft feet 3.0-4.099.1 Cross Slope (PAR)SF29102.2to $120 $3,53415753010ft feet 2.0-3.0103.3 Cross Slope (PAR)SF71110.8to $120 $8,55015753110ft feet 4.0-5.0111.8 Cross Slope (PAR)SF62118.3to $120 $7,41015753210ft feet .36113.1 Vertical Change REF10114.1to138028 10 ft feet 2.0-3.0119.6 Cross Slope (PAR)SF11120.8to $120 $1,36815753310ft feet 3.0-4.0125.4 Cross Slope (PAR)SF140140.1to $120 $16,75815753410ft feet .61129.8 Vertical Change REF10130.8to138029 10 ft feet 2.0-3.0141.3 Cross Slope (PAR)SF26144.0to $120 $3,07815753510ft feet 4.0-5.0146.5 Cross Slope (PAR)SF41150.8to $120 $4,90215753610ft feet 2.0-3.0151.6 Cross Slope (PAR)SF27154.4to $120 $3,19215753710ft feet 2.0-3.0174.8 Cross Slope (PAR)SF76182.8to $120 $9,12015753810ft feet 3.0-4.0186.2 Cross Slope (PAR)SF20188.3to $120 $2,39415753910ft feet 2.0-3.0193.4 Cross Slope (PAR)SF99203.8to $120 $11,85615754010ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 525 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side FWY 710 RAMP Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 2001161108 Run ID Bandini Blvd 77 ID Sidewalk Width Priority feet 4.0-5.0204.7 Cross Slope (PAR)SF223228.2to $120 $26,79015754110ft feet -.43224.8 Vertical Change REF10225.8to138030 10 ft feet 3.0-4.0231.3 Cross Slope (PAR)SF52236.8to $120 $6,27015754210ft feet 2.0-3.0238.1 Cross Slope (PAR)SF109249.6to $120 $13,11015754310ft feet 2.0-3.0251.9 Cross Slope (PAR)SF28254.8to $120 $3,30615754410ft feet 4.0-5.0254.9 Cross Slope (PAR)SF13256.3to $120 $1,59615754510ft feet 3.0-4.0267.3 Cross Slope (PAR)SF115279.4to $120 $13,79415754610ft feet276.1 Continuous Width REF10277.1to167034 10 ft feet 2.0-3.0280.5 Cross Slope (PAR)SF122293.3to $120 $14,59215754710ft feet 4.0-5.0293.3 Cross Slope (PAR)SF10294.3to $120 $1,14015754810ft feet 2.0-3.0298.8 Cross Slope (PAR)SF17300.6to $120 $2,05215754910ft feet 2.0-3.0303.4 Cross Slope (PAR)SF44308.0to $120 $5,24415755010ft feet 2.0-3.0314.3 Cross Slope (PAR)SF49319.5to $120 $5,92815755110ft feet 2.0-3.0321.6 Cross Slope (PAR)SF48326.7to $120 $5,81415755210ft feet 2.0-3.0347.8 Cross Slope (PAR)SF57353.8to $120 $6,84015755310ft feet 2.0-3.0357.7 Cross Slope (PAR)SF74365.5to $120 $8,89215755410ft feet 2.0-3.0375.8 Cross Slope (PAR)SF12377.1to $120 $1,48215755510ft feet 2.0-3.0410.0 Cross Slope (PAR)SF11411.2to $120 $1,36815755610ft feet .57434.0 Vertical Change SF10435.0to $75 $71313803110ft feet 2.0-3.0436.6 Cross Slope (PAR)SF26439.3to $120 $3,07815755710ft feet 2.0-3.0443.8 Cross Slope (PAR)SF20445.9to $120 $2,39415755810ft feet 3.44455.9 Vertical Change SF10456.9to $75 $71313803210ft feet 2.0-3.0479.5 Cross Slope (PAR)SF114491.5to $120 $13,68015755910ft feet 4.0-5.0491.5 Cross Slope (PAR)SF55497.3to $120 $6,61215756010ft feet 2.0-3.0498.3 Cross Slope (PAR)SF14499.8to $120 $1,71015756110ft feet499.8 Cold Patch 52505.3to140247 10 ft feet 2.0-3.0505.9 Cross Slope (PAR)SF12507.2to $120 $1,48215756210ft feet 2.0-3.0510.3 Cross Slope (PAR)SF10511.3to $120 $1,14015756310ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 526 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side FWY 710 RAMP Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 2001161108 Run ID Bandini Blvd 77 ID Sidewalk Width Priority feet 2.0-3.0517.6 Cross Slope (PAR)SF47522.5to $120 $5,58615756410ft $303,411.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:FWY 710 RAMP October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 527 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side PENNINGTON WY Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 2001161204 Run ID Bandini Blvd 81 ID Sidewalk Width Priority feet 2.0-3.02.2 Cross Slope (PAR)SF6811.3to $120 $8,1901571488ft feet 3.0-4.014.2 Cross Slope (PAR)SF1215.8to $120 $1,4401571498ft feet 3.0-4.019.8 Cross Slope (PAR)SF1321.5to $120 $1,5301571508ft feet 3.0-4.026.3 Cross Slope (PAR)SF1027.6to $120 $1,1701571518ft feet 2.0-3.028.6 Cross Slope (PAR)SF3833.6to $120 $4,5001571528ft feet 2.0-3.035.8 Cross Slope (PAR)SF3640.6to $120 $4,3201571538ft feet41.3 Cold Patch 1543.3to140550 8 ft feet 2.0-3.043.3 Cross Slope (PAR)SF1445.1to $120 $1,6201571548ft feet 2.0-3.053.0 Cross Slope (PAR)SF1855.4to $120 $2,1601571558ft feet 2.0-3.062.9 Cross Slope (PAR)SF6771.8to $120 $8,0101571568ft feet 4.0-5.071.8 Cross Slope (PAR)SF2675.3to $120 $3,1501571578ft feet 2.0-3.075.5 Cross Slope (PAR)SF11590.8to $120 $13,7701571588ft feet 2.0-3.093.7 Cross Slope (PAR)SF113108.8to $120 $13,5901571598ft feet 2.0-3.0116.3 Cross Slope (PAR)SF58124.0to $120 $6,9301571608ft feet 2.0-3.0126.8 Cross Slope (PAR)SF73136.5to $120 $8,7301571618ft feet 2.0-3.0138.9 Cross Slope (PAR)SF56146.3to $120 $6,6601571628ft feet 2.0-3.0150.4 Cross Slope (PAR)SF140169.0to $120 $16,7401571638ft feet 2.0-3.0172.5 Cross Slope (PAR)SF26175.9to $120 $3,0601571648ft feet 3.0-4.0178.8 Cross Slope (PAR)SF15180.8to $120 $1,8001571658ft feet 2.0-3.0180.8 Cross Slope (PAR)SF161202.3to $120 $19,3501571668ft feet203.7 Cold Patch 27207.3to140551 8 ft feet 2.0-3.0207.3 Cross Slope (PAR)SF50213.9to $120 $5,9401571678ft feet 3.0-4.0216.6 Cross Slope (PAR)SF20219.3to $120 $2,4301571688ft feet 2.0-3.0221.0 Cross Slope (PAR)SF59228.9to $120 $7,1101571698ft feet 3.0-4.0232.4 Cross Slope (PAR)SF38237.4to $120 $4,5001571708ft feet 2.0-3.0237.4 Cross Slope (PAR)SF44243.3to $120 $5,3101571718ft feet 2.0-3.0247.8 Cross Slope (PAR)SF191273.3to $120 $22,9501571728ft feet 4.0-5.0274.3 Cross Slope (PAR)SF31278.4to $120 $3,6901571738ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 528 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side PENNINGTON WY Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 2001161204 Run ID Bandini Blvd 81 ID Sidewalk Width Priority feet 2.0-3.0282.7 Cross Slope (PAR)SF46288.8to $120 $5,4901571748ft feet .31283.2 Vertical Change REF8284.2to137968 8 ft feet 2.0-3.0305.8 Cross Slope (PAR)SF37310.7to $120 $4,4101571758ft feet 2.0-3.0321.8 Cross Slope (PAR)SF30325.8to $120 $3,6001571768ft feet .26326.3 Vertical Change LF8327.3to $75 $5631379698ft feet 2.0-3.0329.2 Cross Slope (PAR)SF65337.8to $120 $7,7401571778ft feet 2.0-3.0341.8 Cross Slope (PAR)SF113356.8to $120 $13,5001571788ft feet 2.0-3.0358.9 Cross Slope (PAR)SF26362.3to $120 $3,0601571798ft feet 2.0-3.0373.8 Cross Slope (PAR)SF29377.6to $120 $3,4201571808ft feet 2.0-3.0385.0 Cross Slope (PAR)SF12386.6to $120 $1,4401571818ft feet 2.0-3.0389.0 Cross Slope (PAR)SF32393.2to $120 $3,7801571828ft feet 2.0-3.0407.3 Cross Slope (PAR)SF94419.8to $120 $11,2501571838ft feet 3.0-4.0424.9 Cross Slope (PAR)SF35429.5to $120 $4,1401571848ft feet 2.0-3.0430.8 Cross Slope (PAR)SF87442.4to $120 $10,4401571858ft feet 2.0-3.0453.3 Cross Slope (PAR)SF41458.8to $120 $4,9501571868ft feet455.4 Protruding Object JOB8456.4to $99 $991673108ft feet 2.0-3.0462.2 Cross Slope (PAR)SF41467.6to $120 $4,8601571878ft feet 2.0-3.0471.2 Cross Slope (PAR)SF89483.0to $120 $10,6201571888ft feet 2.0-3.0485.7 Cross Slope (PAR)SF9486.9to $120 $1,0801571898ft feet 2.0-3.0491.5 Cross Slope (PAR)SF45497.5to $120 $5,4001571908ft feet .37493.0 Vertical Change REF8494.0to137970 8 ft feet 2.0-3.0501.3 Cross Slope (PAR)SF67510.2to $120 $8,0101571918ft feet 2.0-3.0516.6 Cross Slope (PAR)SF129533.8to $120 $15,4801571928ft feet -.34521.4 Vertical Change REF8522.4to137971 8 ft feet 2.0-3.0537.1 Cross Slope (PAR)SF11538.5to $120 $1,2601571938ft feet 2.0-3.0540.6 Cross Slope (PAR)SF149560.4to $120 $17,8201571948ft feet 5.0-6.0563.3 Cross Slope (PAR)SF23566.3to $120 $2,7001571958ft feet 6.0-7.0566.3 Cross Slope (PAR)SF29570.2to $120 $3,5101571968ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 529 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side PENNINGTON WY Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 2001161204 Run ID Bandini Blvd 81 ID Sidewalk Width Priority feet 5.0-6.0570.2 Cross Slope (PAR)SF92582.5to $120 $11,0701571978ft feet 6.0-7.0582.7 Cross Slope (PAR)SF54589.9to $120 $6,4801571988ft feet 6.0-7.0592.1 Cross Slope (PAR)SF91604.3to $120 $10,9801571998ft feet 5.0-6.0606.0 Cross Slope (PAR)SF83617.1to $120 $9,9901572008ft feet 3.0-4.0617.3 Cross Slope (PAR)SF27620.9to $120 $3,2401572018ft feet 5.0-6.0620.9 Cross Slope (PAR)SF25624.3to $120 $3,0601572028ft feet 6.0-7.0625.8 Cross Slope (PAR)SF11627.3to $120 $1,3501572038ft feet 5.0-6.0627.4 Cross Slope (PAR)SF13629.1to $120 $1,5301572048ft feet 3.0-4.0629.8 Cross Slope (PAR)SF9631.0to $120 $1,0801572058ft feet 2.0-3.0631.5 Cross Slope (PAR)SF12633.1to $120 $1,4401572068ft $377,491.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:PENNINGTON WY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 530 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side PENNINGTON WY Survey Street Name Starting Street Name 5276 BANDINI BLVD End Street Name 2001161124 Run ID Bandini Blvd 69 ID Sidewalk Width Priority feet1.0 Continuous Width REF102.0to167005 10 ft feet 3.0-4.01.2 Cross Slope (PAR)SF102.2to $120 $1,14015736410ft feet .294.4 Vertical Change REF95.4to138002 10 ft feet 6.0-7.05.4 Cross Slope (PAR)SF13219.3to $120 $15,84615736510ft feet 3.298.4 Vertical Change REF109.4to138003 10 ft feet 5.0-6.019.3 Cross Slope (PAR)SF7327.0to $120 $8,77815736610ft feet 6.0-7.027.2 Cross Slope (PAR)SF2529.8to $120 $2,96415736710ft feet 5.0-6.030.5 Cross Slope (PAR)SF6337.1to $120 $7,52415736810ft feet 5.0-6.039.2 Cross Slope (PAR)SF1040.3to $120 $1,25415736910ft feet 4.0-5.045.4 Cross Slope (PAR)SF2948.5to $120 $3,53415737010ft feet 7.0-8.050.1 Cross Slope (PAR)SF3954.2to $120 $4,67415737110ft feet 5.0-6.054.4 Cross Slope (PAR)SF1055.5to $120 $1,25415737210ft feet 6.0-7.056.0 Cross Slope (PAR)SF8665.1to $120 $10,37415737310ft feet 6.0-7.067.2 Cross Slope (PAR)SF3470.8to $120 $4,10415737410ft feet 5.0-6.071.3 Cross Slope (PAR)SF1172.5to $120 $1,36815737510ft feet 6.0-7.072.8 Cross Slope (PAR)SF1474.3to $120 $1,71015737610ft feet 5.0-6.076.8 Cross Slope (PAR)SF10587.8to $120 $12,54015737710ft feet 6.0-7.087.9 Cross Slope (PAR)SF134102.0to $120 $16,07415737810ft feet 5.0-6.0102.3 Cross Slope (PAR)SF68109.5to $120 $8,20815737910ft feet 4.0-5.0113.0 Cross Slope (PAR)SF226136.8to $120 $27,13215738010ft feet 4.0-5.0141.5 Cross Slope (PAR)SF26144.2to $120 $3,07815738110ft feet 6.0-7.0145.7 Cross Slope (PAR)SF23148.1to $120 $2,73615738210ft feet 5.0-6.0148.4 Cross Slope (PAR)SF35152.1to $120 $4,21815738310ft feet 5.0-6.0154.2 Cross Slope (PAR)SF11155.4to $120 $1,36815738410ft feet 3.0-4.0156.8 Cross Slope (PAR)SF35160.5to $120 $4,21815738510ft feet 6.0-7.0162.1 Cross Slope (PAR)SF26164.8to $120 $3,07815738610ft feet 5.0-6.0164.8 Cross Slope (PAR)SF24167.3to $120 $2,85015738710ft feet 3.0-4.0167.3 Cross Slope (PAR)SF24169.8to $120 $2,85015738810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 531 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side PENNINGTON WY Survey Street Name Starting Street Name 5276 BANDINI BLVD End Street Name 2001161124 Run ID Bandini Blvd 69 ID Sidewalk Width Priority feet 3.0-4.0172.8 Cross Slope (PAR)SF87182.0to $120 $10,48815738910ft feet 6.0-7.0184.3 Cross Slope (PAR)SF23186.7to $120 $2,73615739010ft feet 3.0-4.0189.6 Cross Slope (PAR)SF39193.7to $120 $4,67415739110ft feet 5.0-6.0193.7 Cross Slope (PAR)SF104204.6to $120 $12,42615739210ft feet 5.0-6.0207.1 Cross Slope (PAR)SF12208.4to $120 $1,48215739310ft feet 5.0-6.0210.6 Cross Slope (PAR)SF119223.1to $120 $14,25015739410ft feet 6.0-7.0223.5 Cross Slope (PAR)SF47228.4to $120 $5,58615739510ft feet 5.0-6.0228.4 Cross Slope (PAR)SF15230.0to $120 $1,82415739610ft feet 4.0-5.0234.8 Cross Slope (PAR)SF21237.0to $120 $2,50815739710ft feet 5.0-6.0239.8 Cross Slope (PAR)SF14241.3to $120 $1,71015739810ft feet 6.0-7.0242.8 Cross Slope (PAR)SF11244.0to $120 $1,36815739910ft feet 6.0-7.0246.2 Cross Slope (PAR)SF64252.9to $120 $7,63815740010ft feet 5.0-6.0252.9 Cross Slope (PAR)SF30256.1to $120 $3,64815740110ft feet 6.0-7.0256.8 Cross Slope (PAR)SF33260.3to $120 $3,99015740210ft feet 5.0-6.0261.9 Cross Slope (PAR)SF89271.3to $120 $10,71615740310ft feet 6.0-7.0271.5 Cross Slope (PAR)SF29274.6to $120 $3,53415740410ft feet 6.0-7.0277.7 Cross Slope (PAR)SF82286.3to $120 $9,80415740510ft feet 5.0-6.0286.3 Cross Slope (PAR)SF126299.6to $120 $15,16215740610ft feet .39299.4 Vertical Change REF10300.4to138004 10 ft feet 6.0-7.0299.9 Cross Slope (PAR)SF24302.4to $120 $2,85015740710ft feet .3304.5 Vertical Change REF10305.5to138005 10 ft feet 5.0-6.0305.3 Cross Slope (PAR)SF46310.1to $120 $5,47215740810ft feet 4.0-5.0314.0 Cross Slope (PAR)SF27316.8to $120 $3,19215740910ft feet 6.0-7.0318.0 Cross Slope (PAR)SF26320.7to $120 $3,07815741010ft feet 5.0-6.0320.8 Cross Slope (PAR)SF95330.8to $120 $11,40015741110ft feet 6.0-7.0330.8 Cross Slope (PAR)SF110342.4to $120 $13,22415741210ft $305,634.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:PENNINGTON WY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 532 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name AYERS AVE End Street Name 2001161250 Run ID Bandini Blvd 88.5 ID Sidewalk Width Priority feet 3.0-4.07.2 Cross Slope (PAR)SF139.8to $120 $1,5601568395ft feet 2.0-3.011.5 Cross Slope (PAR)SF1414.3to $120 $1,6801568405ft feet 2.0-3.018.1 Cross Slope (PAR)SF3825.7to $120 $4,5601568415ft feet 3.0-4.031.4 Cross Slope (PAR)SF832.9to $120 $9001568425ft feet .3135.6 Vertical Change REF536.6to137935 5 ft feet 2.0-3.035.8 Cross Slope (PAR)SF1137.9to $120 $1,2601568435ft feet 2.0-3.040.8 Cross Slope (PAR)SF4349.4to $120 $5,1601568445ft feet 2.0-3.053.9 Cross Slope (PAR)SF1456.7to $120 $1,6801568455ft feet 2.0-3.062.5 Cross Slope (PAR)SF2868.1to $120 $3,3601568465ft feet 4.0-5.070.3 Cross Slope (PAR)SF2575.3to $120 $3,0001568475ft feet .2680.7 Vertical Change LF581.7to $75 $3751379365ft feet 3.0-4.084.0 Cross Slope (PAR)SF785.3to $120 $7801568485ft feet 2.0-3.086.3 Cross Slope (PAR)SF2691.4to $120 $3,0601568495ft feet .2891.6 Vertical Change LF592.6to $75 $3751379375ft feet 3.5194.9 Vertical Change SF595.9to $75 $3751379385ft feet 2.0-3.0124.1 Cross Slope (PAR)SF6125.3to $120 $7201568505ft feet 2.0-3.0129.7 Cross Slope (PAR)SF26134.8to $120 $3,0601568515ft feet 4.0-5.0134.8 Cross Slope (PAR)SF25139.8to $120 $3,0001568525ft feet 3.0-4.0143.0 Cross Slope (PAR)SF8144.7to $120 $1,0201568535ft feet .27145.7 Vertical Change LF5146.7to $75 $3751379395ft feet 3.0-4.0149.5 Cross Slope (PAR)SF20153.5to $120 $2,4001568545ft feet 2.0-3.0156.7 Cross Slope (PAR)SF6157.9to $120 $7201568555ft feet 2.0-3.0163.7 Cross Slope (PAR)SF6164.8to $120 $6601568565ft feet 2.0-3.0169.4 Cross Slope (PAR)SF7170.8to $120 $8401568575ft feet 2.0-3.0178.8 Cross Slope (PAR)SF5179.8to $120 $6001568585ft feet 2.0-3.0185.8 Cross Slope (PAR)SF13188.3to $120 $1,5001568595ft feet 2.0-3.0243.8 Cross Slope (PAR)SF68257.4to $120 $8,1601568605ft feet 5.0-6.0258.9 Cross Slope (PAR)SF10260.8to $120 $1,1401568615ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 533 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name AYERS AVE End Street Name 2001161250 Run ID Bandini Blvd 88.5 ID Sidewalk Width Priority feet 3.0-4.0264.0 Cross Slope (PAR)SF17267.3to $120 $1,9801568625ft feet 2.0-3.0268.0 Cross Slope (PAR)SF83284.6to $120 $9,9601568635ft feet288.8 Continuous Width SF5289.8to $120 $6001671215ft feet 4.0-5.0289.4 Cross Slope (PAR)SF7290.7to $120 $7801568645ft feet 2.0-3.0292.5 Cross Slope (PAR)SF16295.7to $120 $1,9201568655ft feet 2.0-3.0309.8 Cross Slope (PAR)SF25314.8to $120 $3,0001568665ft feet 2.0-3.0359.5 Cross Slope (PAR)SF14362.3to $120 $1,6801568675ft feet 2.0-3.0387.0 Cross Slope (PAR)SF6388.1to $120 $6601568685ft feet 2.0-3.0393.4 Cross Slope (PAR)SF26398.5to $120 $3,0601568695ft feet 4.0-5.0398.7 Cross Slope (PAR)SF9400.5to $120 $1,0801568705ft feet 3.0-4.0402.6 Cross Slope (PAR)SF28408.2to $120 $3,3601568715ft feet 2.0-3.0408.9 Cross Slope (PAR)SF36416.0to $120 $4,2601568725ft feet 2.0-3.0432.5 Cross Slope (PAR)SF26437.7to $120 $3,1201568735ft feet 3.0-4.0440.8 Cross Slope (PAR)SF7442.1to $120 $7801568745ft feet 2.0-3.0443.3 Cross Slope (PAR)SF78458.9to $120 $9,3601568755ft feet 2.0-3.0462.4 Cross Slope (PAR)SF22466.8to $120 $2,6401568765ft feet 3.0-4.0469.3 Cross Slope (PAR)SF38476.8to $120 $4,5001568775ft feet 2.0-3.0477.9 Cross Slope (PAR)SF10479.9to $120 $1,2001568785ft feet 3.0-4.0483.4 Cross Slope (PAR)SF7484.7to $120 $7801568795ft feet 5.0-6.0486.1 Cross Slope (PAR)SF16489.3to $120 $1,9201568805ft feet 3.0-4.0489.3 Cross Slope (PAR)SF19493.1to $120 $2,2801568815ft feet 2.0-3.0493.8 Cross Slope (PAR)SF18497.3to $120 $2,1001568825ft feet 4.0-5.0500.4 Cross Slope (PAR)SF47509.7to $120 $5,5801568835ft feet 4.0-5.0514.3 Cross Slope (PAR)SF27519.7to $120 $3,2401568845ft feet 2.0-3.0519.7 Cross Slope (PAR)SF13522.2to $120 $1,5001568855ft feet 2.0-3.0524.3 Cross Slope (PAR)SF52534.7to $120 $6,2401568865ft feet 3.0-4.0538.7 Cross Slope (PAR)SF9540.6to $120 $1,1401568875ft feet 3.0-4.0543.1 Cross Slope (PAR)SF8544.7to $120 $9601568885ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 534 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name AYERS AVE End Street Name 2001161250 Run ID Bandini Blvd 88.5 ID Sidewalk Width Priority feet 2.0-3.0545.9 Cross Slope (PAR)SF22550.3to $120 $2,6401568895ft feet 2.0-3.0556.2 Cross Slope (PAR)SF69570.1to $120 $8,3401568905ft feet576.4 Driveway617.7to165904 feet .43590.6 Vertical Change REF5591.6to137940 5 ft feet .38608.5 Vertical Change REF5609.5to137941 5 ft feet -.38617.0 Vertical Change REF5618.0to137942 5 ft feet 4.0-5.0618.5 Cross Slope (Driveway)SF5619.5to $40 $2001568915ft feet 2.0-3.0620.3 Cross Slope (PAR)SF97639.6to $120 $11,5801568925ft feet 2.0-3.0644.3 Cross Slope (PAR)SF10646.2to $120 $1,1401568935ft feet 2.0-3.0648.4 Cross Slope (PAR)SF24653.3to $120 $2,9401568945ft feet 2.0-3.0658.0 Cross Slope (PAR)SF7659.4to $120 $8401568955ft feet 3.0-4.0661.9 Cross Slope (PAR)SF21666.0to $120 $2,4601568965ft feet 2.0-3.0666.0 Cross Slope (PAR)SF50675.9to $120 $5,9401568975ft feet 2.0-3.0678.4 Cross Slope (PAR)SF12680.7to $120 $1,3801568985ft feet 2.0-3.0684.4 Cross Slope (PAR)SF12686.8to $120 $1,4401568995ft feet 2.0-3.0691.0 Cross Slope (PAR)SF8692.6to $120 $9601569005ft feet707.5 Driveway758.9to165905 feet .36732.8 Vertical Change REF5733.8to137943 5 ft feet 3.0-4.0772.7 Cross Slope (PAR)SF6773.9to $120 $7201569015ft feet 2.0-3.0774.3 Cross Slope (PAR)SF8775.8to $120 $9001569025ft feet 2.0-3.0779.7 Cross Slope (PAR)SF16782.8to $120 $1,8601569035ft feet 2.0-3.0787.6 Cross Slope (PAR)SF10789.5to $120 $1,1401569045ft feet 2.0-3.0791.8 Cross Slope (PAR)SF33798.4to $120 $3,9601569055ft feet 2.0-3.0801.3 Cross Slope (PAR)SF8802.8to $120 $9001569065ft feet 2.0-3.0811.5 Cross Slope (PAR)SF18815.1to $120 $2,1601569075ft feet 3.0-4.0817.2 Cross Slope (PAR)SF20821.2to $120 $2,4001569085ft feet 2.0-3.0825.1 Cross Slope (PAR)SF21829.3to $120 $2,5201569095ft feet 2.0-3.0836.2 Cross Slope (PAR)SF6837.3to $120 $6601569105ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 535 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name AYERS AVE End Street Name 2001161250 Run ID Bandini Blvd 88.5 ID Sidewalk Width Priority feet 3.0-4.0839.4 Cross Slope (PAR)SF7840.7to $120 $7801569115ft feet 2.0-3.0840.7 Cross Slope (PAR)SF9842.5to $120 $1,0801569125ft feet 2.0-3.0846.7 Cross Slope (PAR)SF5847.7to $120 $6001569135ft feet 2.0-3.0900.1 Cross Slope (PAR)SF16903.3to $120 $1,9201569145ft feet 2.0-3.0905.8 Cross Slope (PAR)SF19909.5to $120 $2,2201569155ft feet 2.0-3.0914.8 Cross Slope (PAR)SF83931.4to $120 $9,9601569165ft feet 2.0-3.0934.0 Cross Slope (PAR)SF35941.0to $120 $4,2001569175ft feet948.3 Driveway966.9to165906 feet -.43948.5 Vertical Change REF5949.5to137944 5 ft feet 3.0-4.0975.8 Cross Slope (PAR)SF9977.6to $120 $1,0801569185ft feet 2.0-3.0978.1 Cross Slope (PAR)SF9979.8to $120 $1,0201569195ft feet 2.0-3.0982.8 Cross Slope (PAR)SF24987.5to $120 $2,8201569205ft feet 4.0-5.0988.8 Cross Slope (PAR)SF1461017.9to $120 $17,4601569215ft $232,220.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:S ATLANTIC BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 536 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name PENNINGTON WY End Street Name 2001161118 Run ID Bandini Blvd 118.25 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF485.0to $120 $5,70015741310ft feet 3.0-4.010.3 Cross Slope (PAR)SF7718.4to $120 $9,23415741410ft feet 3.0-4.021.8 Cross Slope (PAR)SF2924.8to $120 $3,42015741510ft feet 4.0-5.026.9 Cross Slope (PAR)SF8335.6to $120 $9,91815741610ft feet 3.0-4.038.5 Cross Slope (PAR)SF3041.7to $120 $3,64815741710ft feet 2.0-3.043.0 Cross Slope (PAR)SF1244.3to $120 $1,48215741810ft feet 8.0-9.047.5 Cross Slope (PAR)SF3150.8to $120 $3,76215741910ft feet 6.0-7.051.2 Cross Slope (PAR)SF1452.7to $120 $1,71015742010ft feet 5.0-6.053.3 Cross Slope (PAR)SF10364.1to $120 $12,31215742110ft feet 3.0-4.064.8 Cross Slope (PAR)SF5570.6to $120 $6,61215742210ft feet 5.0-6.070.6 Cross Slope (PAR)SF5075.9to $120 $6,04215742310ft feet 5.0-6.079.4 Cross Slope (PAR)SF7587.3to $120 $9,00615742410ft feet 6.0-7.087.4 Cross Slope (PAR)SF4391.9to $120 $5,13015742510ft feet 5.0-6.092.3 Cross Slope (PAR)SF1293.6to $120 $1,48215742610ft feet 6.0-7.093.6 Cross Slope (PAR)SF3597.3to $120 $4,21815742710ft feet 5.0-6.098.3 Cross Slope (PAR)SF164115.6to $120 $19,72215742810ft feet 5.0-6.0118.1 Cross Slope (PAR)SF219141.2to $120 $26,33415742910ft feet 6.0-7.0141.6 Cross Slope (PAR)SF66148.5to $120 $7,86615743010ft feet 6.0-7.0152.9 Cross Slope (PAR)SF13154.3to $120 $1,59615743110ft feet 5.0-6.0155.8 Cross Slope (PAR)SF17157.6to $120 $2,05215743210ft feet 6.0-7.0161.3 Cross Slope (PAR)SF17163.1to $120 $2,05215743310ft feet 6.0-7.0167.2 Cross Slope (PAR)SF30170.4to $120 $3,64815743410ft feet 6.0-7.0175.4 Cross Slope (PAR)SF14176.9to $120 $1,71015743510ft feet 5.0-6.0176.9 Cross Slope (PAR)SF42181.3to $120 $5,01615743610ft feet 6.0-7.0181.6 Cross Slope (PAR)SF20183.7to $120 $2,39415743710ft feet 5.0-6.0183.9 Cross Slope (PAR)SF66190.8to $120 $7,86615743810ft feet 6.0-7.0192.0 Cross Slope (PAR)SF16193.7to $120 $1,93815743910ft feet 5.0-6.0193.7 Cross Slope (PAR)SF46198.5to $120 $5,47215744010ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 537 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name PENNINGTON WY End Street Name 2001161118 Run ID Bandini Blvd 118.25 ID Sidewalk Width Priority feet .78196.8 Vertical Change REF10197.8to138006 10 ft feet 6.0-7.0198.5 Cross Slope (PAR)SF37202.4to $120 $4,44615744110ft feet -.33201.8 Vertical Change REF10202.8to138007 10 ft feet 5.0-6.0202.4 Cross Slope (PAR)SF37206.3to $120 $4,44615744210ft feet .58206.7 Vertical Change REF10207.7to138008 10 ft feet 6.0-7.0207.3 Cross Slope (PAR)SF26210.0to $120 $3,07815744310ft feet 4.0-5.0211.3 Cross Slope (PAR)SF12212.6to $120 $1,48215744410ft feet 4.0-5.0215.2 Cross Slope (PAR)SF10216.3to $120 $1,25415744510ft feet 4.0-5.0218.9 Cross Slope (PAR)SF52224.4to $120 $6,27015744610ft feet 2.0-3.0226.3 Cross Slope (PAR)SF136240.6to $120 $16,30215744710ft feet235.3 Continuous Width REF10236.3to166981 10 ft feet 5.0-6.0244.8 Cross Slope (PAR)SF17246.6to $120 $2,05215744810ft feet 5.0-6.0255.9 Cross Slope (PAR)SF42260.3to $120 $5,01615744910ft feet 5.0-6.0262.7 Cross Slope (PAR)SF81271.2to $120 $9,69015745010ft feet .31264.7 Vertical Change REF10265.7to138009 10 ft feet271.8 Driveway307.5to165919 feet .27275.3 Vertical Change REF10276.3to138010 10 ft feet 1.07284.2 Vertical Change REF10285.2to138011 10 ft feet .46307.1 Vertical Change REF10308.1to138012 10 ft feet 5.0-6.0308.8 Cross Slope (PAR)SF29311.8to $120 $3,42015745110ft feet 6.0-7.0311.8 Cross Slope (PAR)SF25314.4to $120 $2,96415745210ft feet 8.0-9.0315.2 Cross Slope (PAR)SF10316.3to $120 $1,25415745310ft feet 12.0-13.0318.0 Cross Slope (PAR)SF140332.7to $120 $16,75815745410ft feet 2.16320.7 Vertical Change REF10321.7to138013 10 ft feet 14.0-15.0334.5 Cross Slope (PAR)SF23336.9to $120 $2,73615745510ft feet 7.0-8.0340.3 Cross Slope (PAR)SF200361.3to $120 $23,94015745610ft feet .26342.7 Vertical Change REF10343.7to138014 10 ft feet 5.0-6.0361.8 Cross Slope (PAR)SF83370.5to $120 $9,91815745710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 538 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name PENNINGTON WY End Street Name 2001161118 Run ID Bandini Blvd 118.25 ID Sidewalk Width Priority feet 6.0-7.0370.5 Cross Slope (PAR)SF10371.5to $120 $1,14015745810ft feet 5.0-6.0372.0 Cross Slope (PAR)SF203393.4to $120 $24,39615745910ft feet 5.0-6.0395.9 Cross Slope (PAR)SF27398.7to $120 $3,19215746010ft feet 6.0-7.0401.4 Cross Slope (PAR)SF43405.9to $120 $5,13015746110ft feet 5.0-6.0406.5 Cross Slope (PAR)SF15408.1to $120 $1,82415746210ft feet 6.0-7.0409.4 Cross Slope (PAR)SF42413.8to $120 $5,01615746310ft feet 6.0-7.0416.3 Cross Slope (PAR)SF13417.7to $120 $1,59615746410ft feet 5.0-6.0417.7 Cross Slope (PAR)SF13419.1to $120 $1,59615746510ft feet 6.0-7.0419.3 Cross Slope (PAR)SF10420.4to $120 $1,25415746610ft feet 5.0-6.0421.6 Cross Slope (PAR)SF14423.1to $120 $1,71015746710ft feet 6.0-7.0423.6 Cross Slope (PAR)SF29426.6to $120 $3,42015746810ft feet 5.0-6.0426.6 Cross Slope (PAR)SF105437.7to $120 $12,65415746910ft feet 6.0-7.0438.4 Cross Slope (PAR)SF45443.1to $120 $5,35815747010ft feet 4.0-5.0447.3 Cross Slope (PAR)SF67454.4to $120 $8,09415747110ft feet 5.0-6.0459.3 Cross Slope (PAR)SF60465.6to $120 $7,18215747210ft feet 4.0-5.0467.8 Cross Slope (PAR)SF52473.3to $120 $6,27015747310ft feet 5.0-6.0476.2 Cross Slope (PAR)SF166493.7to $120 $19,95015747410ft feet 6.0-7.0494.8 Cross Slope (PAR)SF29497.8to $120 $3,42015747510ft feet 5.0-6.0499.2 Cross Slope (PAR)SF151515.1to $120 $18,12615747610ft feet .49515.8 Vertical Change LF10516.8to $75 $71313801510ft feet 4.0-5.0518.6 Cross Slope (PAR)SF33522.1to $120 $3,99015747710ft feet 6.0-7.0522.1 Cross Slope (PAR)SF74529.9to $120 $8,89215747810ft feet 5.0-6.0529.9 Cross Slope (PAR)SF77538.0to $120 $9,23415747910ft feet 6.0-7.0538.3 Cross Slope (PAR)SF34541.9to $120 $4,10415748010ft feet 5.0-6.0541.9 Cross Slope (PAR)SF41546.2to $120 $4,90215748110ft feet 6.0-7.0546.2 Cross Slope (PAR)SF61552.6to $120 $7,29615748210ft feet 5.0-6.0550.9 Running Slope REF17552.7to166604 10 ft feet553.8 Cold Patch 32557.2to140555 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 539 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name PENNINGTON WY End Street Name 2001161118 Run ID Bandini Blvd 118.25 ID Sidewalk Width Priority feet 4.0-5.0562.7 Cross Slope (PAR)SF14564.2to $120 $1,71015748310ft feet 6.0-7.0564.9 Cross Slope (PAR)SF41569.2to $120 $4,90215748410ft feet 5.0-6.0571.0 Cross Slope (PAR)SF46575.8to $120 $5,47215748510ft feet 5.0-6.0578.7 Cross Slope (PAR)SF20580.8to $120 $2,39415748610ft feet 6.0-7.0581.4 Cross Slope (PAR)SF27584.2to $120 $3,19215748710ft feet .88583.0 Vertical Change REF10584.0to138016 10 ft feet 5.0-6.0584.3 Cross Slope (PAR)SF31587.6to $120 $3,76215748810ft feet .52588.3 Vertical Change SF10589.3to $75 $71313801710ft feet 5.0-6.0592.4 Cross Slope (PAR)SF18594.3to $120 $2,16615748910ft feet 6.0-7.0595.1 Cross Slope (PAR)SF28598.0to $120 $3,30615749010ft feet 5.0-6.0598.0 Cross Slope (PAR)SF37601.9to $120 $4,44615749110ft feet .32604.5 Vertical Change LF10605.5to $75 $71313801810ft feet 6.0-7.0605.8 Cross Slope (PAR)SF30609.0to $120 $3,64815749210ft feet .75608.1 Vertical Change REF10609.1to138019 10 ft feet 4.0-5.0610.8 Cross Slope (PAR)SF147626.3to $120 $17,67015749310ft feet -.45611.4 Vertical Change REF10612.4to138020 10 ft feet 6.0-7.0626.3 Cross Slope (PAR)SF73634.0to $120 $8,77815749410ft feet 4.0-5.0636.8 Cross Slope (PAR)SF144652.0to $120 $17,32815749510ft feet 6.0-7.0654.1 Cross Slope (PAR)SF32657.5to $120 $3,87615749610ft feet 5.0-6.0657.5 Cross Slope (PAR)SF172675.6to $120 $20,63415749710ft feet 6.0-7.0676.2 Cross Slope (PAR)SF46681.0to $120 $5,47215749810ft feet 5.0-6.0684.5 Cross Slope (PAR)SF10685.5to $120 $1,14015749910ft feet 6.0-7.0685.5 Cross Slope (PAR)SF29688.6to $120 $3,53415750010ft feet .37688.7 Vertical Change REF10689.7to138021 10 ft feet 5.0-6.0689.4 Cross Slope (PAR)SF64696.1to $120 $7,63815750110ft feet 6.0-7.0696.1 Cross Slope (PAR)SF61702.5to $120 $7,29615750210ft feet 5.0-6.0702.5 Cross Slope (PAR)SF40706.7to $120 $4,78815750310ft feet 6.0-7.0707.8 Cross Slope (PAR)SF92717.5to $120 $11,05815750410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 540 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name PENNINGTON WY End Street Name 2001161118 Run ID Bandini Blvd 118.25 ID Sidewalk Width Priority feet 5.0-6.0718.3 Cross Slope (PAR)SF70725.7to $120 $8,43615750510ft feet 3.0-4.0726.3 Cross Slope (PAR)SF17728.1to $120 $2,05215750610ft feet .44727.4 Vertical Change REF10728.4to138022 10 ft feet 6.0-7.0730.4 Cross Slope (PAR)SF17732.2to $120 $2,05215750710ft feet 5.0-6.0732.2 Cross Slope (PAR)SF32735.6to $120 $3,87615750810ft feet .26736.9 Vertical Change REF28739.8to138023 10 ft feet 7.0-8.0737.8 Cross Slope (PAR)SF10738.8to $120 $1,14015750910ft feet 6.0-7.0742.3 Cross Slope (PAR)SF96752.4to $120 $11,51415751010ft feet 5.0-6.0753.0 Cross Slope (PAR)SF41757.3to $120 $4,90215751110ft feet .35762.8 Vertical Change LF10763.8to $75 $71313802410ft feet .3773.0 Vertical Change LF10774.0to $75 $71313802510ft feet 14.0-15.0776.8 Cross Slope (PAR)SF43781.3to $120 $5,13015751210ft feet 11.0-12.0782.6 Cross Slope (PAR)SF10783.7to $120 $1,25415751310ft feet .3782.7 Vertical Change REF10783.7to138026 10 ft feet 7.0-8.0786.3 Cross Slope (PAR)SF45791.0to $120 $5,35815751410ft feet -.43786.8 Vertical Change REF10787.8to138027 10 ft feet 5.0-6.0789.8 Running Slope REF14791.3to166605 10 ft $649,600.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:S ATLANTIC BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 541 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161600 Run ID Bandini Blvd 60.25 ID Sidewalk Width Priority feet 2.0-3.02.0 Cross Slope (PAR)SF588.1to $120 $6,95415617210ft feet 4.0-5.09.1 Cross Slope (PAR)SF4013.3to $120 $4,78815617310ft feet 2.0-3.013.8 Cross Slope (PAR)SF1115.0to $120 $1,36815617410ft feet 2.0-3.017.8 Cross Slope (PAR)SF3521.5to $120 $4,21815617510ft feet 2.0-3.030.8 Cross Slope (PAR)SF1232.1to $120 $1,48215617610ft feet 4.0-5.032.8 Cross Slope (PAR)SF10443.7to $120 $12,42615617710ft feet 2.0-3.052.9 Cross Slope (PAR)SF3556.6to $120 $4,21815617810ft feet .3457.7 Vertical Change LF1058.7to $75 $71313782010ft feet 2.0-3.071.4 Cross Slope (PAR)SF1272.7to $120 $1,48215617910ft feet 2.0-3.090.3 Cross Slope (PAR)SF2893.2to $120 $3,30615618010ft feet 2.0-3.098.9 Cross Slope (PAR)SF127112.3to $120 $15,27615618110ft feet 5.0-6.0113.3 Cross Slope (PAR)SF14114.8to $120 $1,71015618210ft feet 3.0-4.0116.2 Cross Slope (PAR)SF10117.3to $120 $1,25415618310ft feet 2.0-3.0117.3 Cross Slope (PAR)SF36121.1to $120 $4,33215618410ft feet 4.0-5.0122.5 Cross Slope (PAR)SF111134.2to $120 $13,33815618510ft feet 4.0-5.0138.3 Cross Slope (PAR)SF126151.6to $120 $15,16215618610ft feet 2.0-3.0152.3 Cross Slope (PAR)SF10153.3to $120 $1,14015618710ft feet 2.0-3.0156.2 Cross Slope (PAR)SF10157.3to $120 $1,25415618810ft feet 5.0-6.0158.5 Cross Slope (PAR)SF13159.9to $120 $1,59615618910ft feet 4.0-5.0162.0 Cross Slope (PAR)SF87171.2to $120 $10,48815619010ft feet .32163.2 Vertical Change REF10164.2to137821 10 ft feet 2.0-3.0174.8 Cross Slope (PAR)SF122187.6to $120 $14,59215619110ft feet -.3181.3 Vertical Change REF10182.3to137822 10 ft feet 4.0-5.0189.6 Cross Slope (PAR)SF33193.1to $120 $3,99015619210ft feet 2.0-3.0194.5 Cross Slope (PAR)SF12195.8to $120 $1,48215619310ft feet 3.0-4.0199.3 Cross Slope (PAR)SF18201.2to $120 $2,16615619410ft feet 5.0-6.0202.9 Cross Slope (PAR)SF14204.4to $120 $1,71015619510ft feet 6.0-7.0204.4 Cross Slope (PAR)SF42208.8to $120 $5,01615619610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 542 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161600 Run ID Bandini Blvd 60.25 ID Sidewalk Width Priority feet208.8 Cold Patch 40213.0to140541 10 ft feet .32211.4 Vertical Change LF10212.4to $75 $71313782310ft feet 5.0-6.0217.1 Cross Slope (PAR)SF16218.8to $120 $1,93815619710ft feet 5.0-6.0220.9 Cross Slope (PAR)SF28223.8to $120 $3,30615619810ft feet .42227.5 Vertical Change LF10228.5to $75 $71313782410ft feet 3.0-4.0229.1 Cross Slope (PAR)SF12230.4to $120 $1,48215619910ft feet 6.0-7.0231.5 Cross Slope (PAR)SF11232.7to $120 $1,36815620010ft feet -.28237.0 Vertical Change LF10238.0to $75 $71313782510ft feet 2.0-3.0238.5 Cross Slope (PAR)SF15240.1to $120 $1,82415620110ft feet 2.0-3.0265.3 Cross Slope (PAR)SF43269.8to $120 $5,13015620210ft feet 2.0-3.0274.0 Cross Slope (PAR)SF28276.9to $120 $3,30615620310ft feet 2.0-3.0285.6 Cross Slope (PAR)SF40289.8to $120 $4,78815620410ft feet .55285.7 Vertical Change REF10286.7to137826 10 ft feet 2.0-3.0292.3 Cross Slope (PAR)SF97302.5to $120 $11,62815620510ft feet .69294.6 Vertical Change REF10295.6to137827 10 ft feet -.26301.4 Vertical Change REF10302.4to137828 10 ft feet 2.0-3.0304.8 Cross Slope (PAR)SF43309.3to $120 $5,13015620610ft feet .29307.4 Vertical Change REF10308.4to137829 10 ft feet .39313.6 Vertical Change LF10314.6to $75 $71313783010ft feet 3.0-4.0315.3 Cross Slope (PAR)SF17317.1to $120 $2,05215620710ft feet .26319.5 Vertical Change REF10320.5to137831 10 ft feet 2.0-3.0320.5 Cross Slope (PAR)SF19322.5to $120 $2,28015620810ft feet 2.0-3.0327.3 Cross Slope (PAR)SF29330.3to $120 $3,42015620910ft feet 2.0-3.0335.2 Cross Slope (PAR)SF71342.7to $120 $8,55015621010ft feet 2.0-3.0351.2 Cross Slope (PAR)SF44355.8to $120 $5,24415621110ft feet 2.0-3.0364.8 Cross Slope (PAR)SF60371.1to $120 $7,18215621210ft feet 3.0-4.0374.7 Cross Slope (PAR)SF12376.0to $120 $1,48215621310ft feet 2.0-3.0376.5 Cross Slope (PAR)SF15378.1to $120 $1,82415621410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 543 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161600 Run ID Bandini Blvd 60.25 ID Sidewalk Width Priority feet 3.0-4.0380.2 Cross Slope (PAR)SF22382.5to $120 $2,62215621510ft feet 2.0-3.0382.5 Cross Slope (PAR)SF50387.8to $120 $6,04215621610ft feet .3385.3 Vertical Change REF35389.0to137832 10 ft feet 2.0-3.0393.3 Cross Slope (PAR)SF10394.3to $120 $1,14015621710ft feet .42398.6 Vertical Change LF10399.6to $75 $71313783310ft feet -.3400.9 Vertical Change REF10401.9to137834 10 ft feet 2.0-3.0401.9 Cross Slope (PAR)SF54407.6to $120 $6,49815621810ft feet 4.0-5.0411.2 Cross Slope (PAR)SF72418.8to $120 $8,66415621910ft feet 2.0-3.0419.3 Cross Slope (PAR)SF146434.7to $120 $17,55615622010ft feet 3.0-4.0438.0 Cross Slope (PAR)SF12439.3to $120 $1,48215622110ft feet 3.0-4.0443.0 Cross Slope (PAR)SF10444.1to $120 $1,25415622210ft feet 2.0-3.0444.6 Cross Slope (PAR)SF55450.4to $120 $6,61215622310ft feet 2.0-3.0475.3 Cross Slope (PAR)SF14476.8to $120 $1,71015622410ft feet .27492.2 Vertical Change LF10493.2to $75 $71313783510ft feet -.34494.9 Vertical Change LF10495.9to $75 $71313783610ft feet 3.0-4.0500.7 Cross Slope (PAR)SF45505.4to $120 $5,35815622510ft feet 2.0-3.0508.8 Cross Slope (PAR)SF113520.7to $120 $13,56615622610ft feet 2.0-3.0523.1 Cross Slope (PAR)SF86532.2to $120 $10,37415622710ft feet 2.0-3.0535.8 Cross Slope (PAR)SF12537.1to $120 $1,48215622810ft feet 2.0-3.0541.2 Cross Slope (PAR)SF33544.7to $120 $3,99015622910ft feet 2.0-3.0547.3 Cross Slope (PAR)SF11548.5to $120 $1,36815623010ft feet 2.0-3.0550.7 Cross Slope (PAR)SF37554.6to $120 $4,44615623110ft feet 4.0-5.0554.8 Cross Slope (PAR)SF32558.2to $120 $3,87615623210ft feet 3.0-4.0582.6 Cross Slope (PAR)SF35586.3to $120 $4,21815623310ft feet 2.0-3.0595.3 Cross Slope (PAR)SF18597.2to $120 $2,16615623410ft feet 2.0-3.0599.8 Cross Slope (PAR)SF97610.0to $120 $11,62815623510ft feet 2.0-3.0612.8 Cross Slope (PAR)SF19614.8to $120 $2,28015623610ft feet .33632.0 Vertical Change LF10633.0to $75 $71313783810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 544 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161600 Run ID Bandini Blvd 60.25 ID Sidewalk Width Priority feet .28639.9 Vertical Change LF10640.9to $75 $71313783910ft feet -.32645.8 Vertical Change LF10646.8to $75 $71313784010ft feet 3.0-4.0658.4 Cross Slope (PAR)SF25661.0to $120 $2,96415623710ft feet .29661.0 Vertical Change REF10662.0to137841 10 ft feet 5.0-6.0661.3 Cross Slope (PAR)SF46666.1to $120 $5,47215623810ft feet 3.0-4.0666.4 Cross Slope (PAR)SF14667.9to $120 $1,71015623910ft feet 3.0-4.0671.5 Cross Slope (PAR)SF14673.0to $120 $1,71015624010ft feet 2.0-3.0676.5 Cross Slope (PAR)SF31679.8to $120 $3,76215624110ft feet 4.0-5.0682.1 Cross Slope (PAR)SF11683.3to $120 $1,36815624210ft feet .29683.3 Vertical Change REF10684.3to137842 10 ft feet 2.0-3.0684.4 Cross Slope (PAR)SF10685.4to $120 $1,14015624310ft feet 2.0-3.0689.7 Cross Slope (PAR)SF28692.6to $120 $3,30615624410ft feet -.28691.7 Vertical Change REF10692.7to137843 10 ft feet 3.0-4.0711.4 Cross Slope (PAR)SF105722.4to $120 $12,54015624510ft feet 4.0-5.0725.3 Cross Slope (PAR)SF80733.7to $120 $9,57615624610ft feet 3.0-4.0739.3 Cross Slope (PAR)SF10740.4to $120 $1,25415624710ft feet 4.0-5.0747.1 Cross Slope (PAR)SF137761.5to $120 $16,41615624810ft feet 2.0-3.0762.0 Cross Slope (PAR)SF150777.8to $120 $18,01215624910ft feet 4.0-5.0779.8 Cross Slope (PAR)SF36783.6to $120 $4,33215625010ft feet 2.0-3.0783.8 Cross Slope (PAR)SF109795.3to $120 $13,11015625110ft feet 2.0-3.0802.1 Cross Slope (PAR)SF10803.1to $120 $1,14015625210ft feet 2.0-3.0806.0 Cross Slope (PAR)SF10807.0to $120 $1,14015625310ft feet 2.0-3.0813.5 Cross Slope (PAR)SF75821.4to $120 $9,00615625410ft feet 2.0-3.0838.6 Cross Slope (PAR)SF11839.8to $120 $1,36815625510ft feet 2.0-3.0844.0 Cross Slope (PAR)SF26846.7to $120 $3,07815625610ft feet 2.0-3.0852.7 Cross Slope (PAR)SF36856.5to $120 $4,33215625710ft feet .28853.7 Vertical Change REF10854.7to137844 10 ft feet 2.0-3.0860.8 Cross Slope (PAR)SF20862.9to $120 $2,39415625810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 545 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161600 Run ID Bandini Blvd 60.25 ID Sidewalk Width Priority feet .28861.5 Vertical Change REF10862.5to137845 10 ft feet862.9 Driveway899.7to165859 feet 2.0-3.0901.4 Cross Slope (PAR)SF47906.3to $120 $5,58615625910ft feet 2.0-3.0910.5 Cross Slope (PAR)SF32913.9to $120 $3,87615626010ft feet 2.0-3.0921.8 Cross Slope (PAR)SF18923.7to $120 $2,16615626110ft feet924.5 Driveway969.8to165860 feet924.5 Driveway1033.3to165861 feet .75938.2 Vertical Change REF10939.2to137846 10 ft feet 2.0-3.0980.8 Cross Slope (Driveway)SF25983.4to $40 $98815626210ft feet 2.0-3.0991.4 Cross Slope (Driveway)SF14992.9to $40 $57015626310ft feet -.26993.0 Vertical Change REF10994.0to137847 10 ft feet 2.0-3.01002.8 Cross Slope (Driveway)SF481007.8to $40 $1,90015626410ft feet 3.0-4.01010.8 Cross Slope (Driveway)SF331014.3to $40 $1,33015626510ft feet 5.0-6.01018.1 Running Slope REF111019.3to166551 10 ft feet 3.0-4.01020.5 Cross Slope (Driveway)SF251023.1to $40 $98815626610ft feet 6.0-7.01030.8 Running Slope REF221033.1to166552 10 ft $469,385.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:S INDIANA ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 546 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001171104 Run ID Bandini Blvd 45.25 ID Sidewalk Width Priority feet 2.0-3.010.2 Cross Slope (PAR)SF1912.2to $120 $2,28015844310ft feet .2713.7 Vertical Change LF1014.7to $75 $71313821910ft feet .2825.2 Vertical Change LF1026.2to $75 $71313822010ft feet 2.0-3.043.1 Cross Slope (PAR)SF11655.3to $120 $13,90815844410ft feet .7448.4 Vertical Change REF1049.4to138221 10 ft feet 2.0-3.060.6 Cross Slope (PAR)SF10271.3to $120 $12,19815844510ft feet -.2871.5 Vertical Change LF1072.5to $75 $71313822210ft feet 2.0-3.075.2 Cross Slope (PAR)SF3578.9to $120 $4,21815844610ft feet 3.0-4.081.3 Cross Slope (PAR)SF2383.7to $120 $2,73615844710ft feet 2.0-3.083.7 Cross Slope (PAR)SF1685.4to $120 $1,93815844810ft feet 2.0-3.094.9 Cross Slope (PAR)SF2897.8to $120 $3,30615844910ft feet -.3396.6 Vertical Change REF1097.6to138223 10 ft feet .47104.7 Vertical Change LF10105.7to $75 $71313822410ft feet 2.0-3.0113.8 Cross Slope (PAR)SF43118.3to $120 $5,13015845010ft feet 2.0-3.0136.9 Cross Slope (PAR)SF13138.3to $120 $1,59615845110ft feet 3.0-4.0142.8 Cross Slope (PAR)SF33146.3to $120 $3,99015845210ft feet .31146.8 Vertical Change LF10147.8to $75 $71313822510ft feet 2.0-3.0160.8 Cross Slope (PAR)SF25163.4to $120 $2,96415845310ft feet 2.0-3.0168.9 Cross Slope (PAR)SF10169.9to $120 $1,14015845410ft feet 4.0-5.0172.3 Cross Slope (PAR)SF15173.9to $120 $1,82415845510ft feet 2.0-3.0174.7 Cross Slope (PAR)SF15176.3to $120 $1,82415845610ft feet176.3 Driveway204.6to165976 feet 3.0-4.0204.6 Cross Slope (Driveway)SF24207.1to $40 $95015845710ft feet 2.0-3.0209.4 Cross Slope (PAR)SF25212.0to $120 $2,96415845810ft feet 4.0-5.0212.2 Cross Slope (PAR)SF10213.2to $120 $1,14015845910ft feet 4.0-5.0217.6 Cross Slope (PAR)SF29220.6to $120 $3,42015846010ft feet .29220.4 Vertical Change REF10221.4to138226 10 ft feet .32233.0 Vertical Change LF10234.0to $75 $71313822710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 547 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001171104 Run ID Bandini Blvd 45.25 ID Sidewalk Width Priority feet 2.0-3.0235.0 Cross Slope (PAR)SF32238.4to $120 $3,87615846110ft feet 2.0-3.0242.0 Cross Slope (PAR)SF22244.3to $120 $2,62215846210ft feet 4.0-5.0246.3 Cross Slope (PAR)SF35250.0to $120 $4,21815846310ft feet 3.0-4.0253.4 Cross Slope (PAR)SF12254.7to $120 $1,48215846410ft feet 2.0-3.0254.7 Cross Slope (PAR)SF12256.0to $120 $1,48215846510ft feet 2.0-3.0258.4 Cross Slope (PAR)SF12259.7to $120 $1,48215846610ft feet 2.0-3.0266.0 Cross Slope (PAR)SF26268.7to $120 $3,07815846710ft feet .35266.6 Vertical Change REF10267.6to138228 10 ft feet 3.0-4.0293.5 Cross Slope (PAR)SF177312.1to $120 $21,20415846810ft feet 2.0-3.0312.1 Cross Slope (PAR)SF21314.3to $120 $2,50815846910ft feet .38313.9 Vertical Change REF36317.7to138230 10 ft feet 3.0-4.0317.7 Cross Slope (PAR)SF21319.9to $120 $2,50815847010ft feet 2.0-3.0323.0 Cross Slope (PAR)SF15324.6to $120 $1,82415847110ft feet 2.0-3.0327.4 Cross Slope (PAR)SF15329.0to $120 $1,82415847210ft feet 2.0-3.0331.8 Cross Slope (PAR)SF128345.3to $120 $15,39015847310ft feet 2.0-3.0349.7 Cross Slope (PAR)SF41354.0to $120 $4,90215847410ft feet 2.0-3.0360.3 Cross Slope (PAR)SF16362.0to $120 $1,93815847510ft feet -.27365.7 Vertical Change LF10366.7to $75 $71313823110ft feet 3.0-4.0368.6 Cross Slope (PAR)SF13370.0to $120 $1,59615847610ft feet 2.0-3.0370.3 Cross Slope (PAR)SF64377.0to $120 $7,63815847710ft feet 2.0-3.0384.3 Cross Slope (PAR)SF10385.3to $120 $1,14015847810ft feet 4.0-5.0386.6 Cross Slope (PAR)SF35390.3to $120 $4,21815847910ft feet 2.0-3.0391.3 Cross Slope (PAR)SF104402.2to $120 $12,42615848010ft feet .72402.9 Vertical Change SF10403.9to $75 $71313823210ft feet -.33406.1 Vertical Change LF10407.1to $75 $71313823310ft feet 3.0-4.0407.5 Cross Slope (PAR)SF23409.9to $120 $2,73615848110ft feet 2.0-3.0412.7 Cross Slope (PAR)SF25415.3to $120 $2,96415848210ft feet 5.0-6.0413.1 Running Slope REF11414.3to166627 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 548 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001171104 Run ID Bandini Blvd 45.25 ID Sidewalk Width Priority feet415.3 Driveway464.3to165977 feet 2.0-3.0469.6 Cross Slope (PAR)SF10470.6to $120 $1,14015848310ft feet 2.0-3.0485.1 Cross Slope (PAR)SF59491.3to $120 $7,06815848410ft feet 2.0-3.0493.4 Cross Slope (PAR)SF19495.4to $120 $2,28015848510ft feet 2.0-3.0499.5 Cross Slope (PAR)SF36503.3to $120 $4,33215848610ft feet 3.0-4.0507.8 Cross Slope (PAR)SF54513.5to $120 $6,49815848710ft feet 2.0-3.0514.2 Cross Slope (PAR)SF23516.6to $120 $2,73615848810ft feet 2.0-3.0526.3 Cross Slope (PAR)SF180545.2to $120 $21,54615848910ft feet 4.0-5.0545.2 Cross Slope (PAR)SF10546.2to $120 $1,14015849010ft feet 3.0-4.0549.1 Cross Slope (PAR)SF11550.3to $120 $1,36815849110ft feet 3.0-4.0553.9 Cross Slope (PAR)SF10554.9to $120 $1,14015849210ft feet 3.0-4.0557.4 Cross Slope (PAR)SF34561.0to $120 $4,10415849310ft feet 2.0-3.0562.9 Cross Slope (PAR)SF12564.2to $120 $1,48215849410ft feet 2.0-3.0567.3 Cross Slope (PAR)SF45572.0to $120 $5,35815849510ft feet 2.0-3.0575.3 Cross Slope (PAR)SF12576.6to $120 $1,48215849610ft feet 4.0-5.0581.9 Cross Slope (PAR)SF24584.4to $120 $2,85015849710ft feet 2.0-3.0585.8 Cross Slope (PAR)SF54591.5to $120 $6,49815849810ft feet .5594.5 Vertical Change REF10595.5to138234 10 ft feet 2.0-3.0595.3 Cross Slope (PAR)SF67602.4to $120 $8,09415849910ft feet 2.0-3.0609.3 Cross Slope (PAR)SF60615.6to $120 $7,18215850010ft feet 2.0-3.0618.3 Cross Slope (PAR)SF216641.0to $120 $25,87815850110ft feet 3.0-4.0643.5 Cross Slope (PAR)SF67650.6to $120 $8,09415850210ft feet 2.0-3.0651.2 Cross Slope (PAR)SF10652.2to $120 $1,14015850310ft feet 2.0-3.0654.3 Cross Slope (PAR)SF15655.9to $120 $1,82415850410ft feet 2.0-3.0658.8 Cross Slope (PAR)SF105669.9to $120 $12,65415850510ft feet 2.0-3.0690.1 Cross Slope (PAR)SF49695.3to $120 $5,92815850610ft feet 2.0-3.0700.3 Cross Slope (PAR)SF100710.8to $120 $11,97015850710ft feet 2.0-3.0716.0 Cross Slope (PAR)SF12717.3to $120 $1,48215850810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 549 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001171104 Run ID Bandini Blvd 45.25 ID Sidewalk Width Priority feet 3.0-4.0719.8 Cross Slope (PAR)SF124732.9to $120 $14,93415850910ft feet 2.0-3.0735.8 Cross Slope (PAR)SF24738.3to $120 $2,85015851010ft feet 2.0-3.0740.5 Cross Slope (PAR)SF105751.6to $120 $12,65415851110ft feet 3.0-4.0757.3 Cross Slope (PAR)SF25759.9to $120 $2,96415851210ft feet 2.0-3.0761.8 Cross Slope (PAR)SF10762.9to $120 $1,25415851310ft feet764.0 Driveway807.7to165978 feet 3.0-4.0809.4 Cross Slope (PAR)SF36813.2to $120 $4,33215851410ft feet 2.0-3.0814.3 Cross Slope (PAR)SF18816.2to $120 $2,16615851510ft feet -.54816.6 Vertical Change SF10817.6to $75 $71313823510ft feet 4.0-5.0829.3 Cross Slope (PAR)SF57835.3to $120 $6,84015851610ft feet 2.0-3.0835.3 Cross Slope (PAR)SF249861.5to $120 $29,86815851710ft feet 4.0-5.0866.8 Cross Slope (PAR)SF14868.3to $120 $1,71015851810ft feet 2.0-3.0874.7 Cross Slope (PAR)SF10875.7to $120 $1,14015851910ft feet876.9 Driveway912.8to165979 feet 2.0-3.0916.2 Cross Slope (PAR)SF225939.9to $120 $27,01815852010ft feet 4.0-5.0941.2 Cross Slope (PAR)SF225964.9to $120 $27,01815852110ft feet965.6 Driveway998.1to165980 feet 3.0-4.0998.1 Cross Slope (Driveway)SF681005.3to $40 $2,73615852210ft feet 2.0-3.01005.4 Cross Slope (PAR)SF101006.4to $120 $1,14015852310ft feet 2.0-3.01023.6 Cross Slope (PAR)SF591029.8to $120 $7,06815852410ft feet 2.0-3.01046.3 Cross Slope (PAR)SF331049.8to $120 $3,99015852510ft feet 2.91047.4 Vertical Change REF101048.4to138236 10 ft feet 4.0-5.01050.6 Cross Slope (PAR)SF171052.4to $120 $2,05215852610ft feet1052.4 Driveway1084.3to165981 feet1052.4 Driveway1191.8to165982 feet 3.0-4.01084.3 Cross Slope (Driveway)SF381088.3to $40 $1,52015852710ft feet 4.0-5.01091.9 Cross Slope (Driveway)SF621098.4to $40 $2,47015852810ft feet .341101.7 Vertical Change REF101102.7to138237 10 ft feet 2.0-3.01108.3 Cross Slope (Driveway)SF121109.6to $40 $49415852910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 550 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S INDIANA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001171104 Run ID Bandini Blvd 45.25 ID Sidewalk Width Priority feet 2.0-3.01112.3 Cross Slope (Driveway)SF1251125.5to $40 $5,01615853010ft feet 3.011131.1 Vertical Change REF101132.1to138238 10 ft feet 2.0-3.01135.4 Cross Slope (Driveway)SF151137.0to $40 $60815853110ft feet 2.0-3.01142.6 Cross Slope (Driveway)SF191144.6to $40 $76015853210ft feet 3.0-4.01149.2 Cross Slope (Driveway)SF151150.8to $40 $60815853310ft feet 2.0-3.01151.1 Cross Slope (Driveway)SF991161.5to $40 $3,95215853410ft feet 2.0-3.01167.5 Cross Slope (Driveway)SF161169.2to $40 $64615853510ft feet 3.0-4.01171.6 Cross Slope (Driveway)SF121172.9to $40 $49415853610ft feet 4.0-5.01180.7 Cross Slope (Driveway)SF171182.5to $40 $68415853710ft feet 2.0-3.01184.5 Cross Slope (Driveway)SF461189.3to $40 $1,82415853810ft $503,785.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:S INDIANA ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 551 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SOTO ST Survey Street Name Starting Street Name EAST SIDE OF LA RIVER End Street Name 2001151231 Run ID Bandini Blvd 105.75 ID Sidewalk Width Priority feet 4.0-5.03.6 Cross Slope (PAR)SF469.7to $120 $5,4901552158ft feet 6.0-7.09.8 Cross Slope (PAR)SF1611.9to $120 $1,8901552168ft feet 3.0-4.013.3 Cross Slope (PAR)SF1515.3to $120 $1,8001552178ft feet 2.0-3.015.3 Cross Slope (PAR)SF14134.1to $120 $16,9201552188ft feet -.2821.9 Vertical Change REF822.9to137635 8 ft feet 4.0-5.034.6 Cross Slope (PAR)SF8345.7to $120 $9,9901552198ft feet 2.0-3.046.0 Cross Slope (PAR)SF9658.8to $120 $11,5201552208ft feet 1.0849.5 Vertical Change REF850.5to137636 8 ft feet 2.0-3.062.8 Cross Slope (PAR)SF4568.8to $120 $5,4001552218ft feet 4.0-5.068.8 Cross Slope (PAR)SF3773.7to $120 $4,4101552228ft feet 3.0-4.091.6 Cross Slope (PAR)SF892.7to $120 $9901552238ft feet .6591.9 Vertical Change REF892.9to137637 8 ft feet .5796.4 Vertical Change REF897.4to137638 8 ft feet 2.0-3.096.8 Cross Slope (PAR)SF1198.2to $120 $1,2601552248ft feet 2.0-3.0101.7 Cross Slope (PAR)SF8102.8to $120 $9901552258ft feet 2.0-3.0109.8 Cross Slope (PAR)SF92122.0to $120 $10,9801552268ft feet 2.0-3.0125.7 Cross Slope (PAR)SF86137.1to $120 $10,2601552278ft feet 4.0-5.0137.1 Cross Slope (PAR)SF9138.3to $120 $1,0801552288ft feet 3.0-4.0141.3 Cross Slope (PAR)SF34145.8to $120 $4,0501552298ft feet 3.0-4.0148.5 Cross Slope (PAR)SF54155.7to $120 $6,4801552308ft feet .47154.2 Vertical Change REF8155.2to137639 8 ft feet 2.0-3.0157.3 Cross Slope (PAR)SF15159.3to $120 $1,8001552318ft feet 3.0-4.0162.0 Cross Slope (PAR)SF129179.2to $120 $15,4801552328ft feet 2.0-3.0179.2 Cross Slope (PAR)SF8180.2to $120 $9001552338ft feet 2.0-3.0183.1 Cross Slope (PAR)SF64191.6to $120 $7,6501552348ft feet 4.0-5.0192.4 Cross Slope (PAR)SF50199.0to $120 $5,9401552358ft feet 2.0-3.0201.2 Cross Slope (PAR)SF45207.2to $120 $5,4001552368ft feet 2.48204.9 Vertical Change SF8205.9to $75 $5631376408ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 552 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SOTO ST Survey Street Name Starting Street Name EAST SIDE OF LA RIVER End Street Name 2001151231 Run ID Bandini Blvd 105.75 ID Sidewalk Width Priority feet 3.0-4.0209.8 Cross Slope (PAR)SF11211.3to $120 $1,3501552378ft feet 2.0-3.0211.3 Cross Slope (PAR)SF32215.5to $120 $3,7801552388ft feet 4.0-5.0217.0 Cross Slope (PAR)SF14218.8to $120 $1,6201552398ft feet 4.0-5.0221.0 Cross Slope (PAR)SF92233.3to $120 $11,0701552408ft feet 3.0-4.0236.8 Cross Slope (PAR)SF25240.1to $120 $2,9701552418ft feet -.26242.9 Vertical Change LF8243.9to $75 $5631376418ft feet 2.0-3.0245.7 Cross Slope (PAR)SF71255.2to $120 $8,5501552428ft feet .26249.5 Vertical Change REF8250.5to137642 8 ft feet 2.0-3.0265.9 Cross Slope (PAR)SF14267.8to $120 $1,7101552438ft feet 2.0-3.0270.4 Cross Slope (PAR)SF112285.3to $120 $13,4101552448ft feet 3.0-4.0288.0 Cross Slope (PAR)SF8289.1to $120 $9901552458ft feet 2.0-3.0289.1 Cross Slope (PAR)SF15291.1to $120 $1,8001552468ft feet 4.0-5.0296.8 Cross Slope (PAR)SF64305.4to $120 $7,7401552478ft feet 2.0-3.0305.4 Cross Slope (PAR)SF54312.6to $120 $6,4801552488ft feet 1.65310.4 Vertical Change REF8311.4to137643 8 ft feet 4.0-5.0313.0 Cross Slope (PAR)SF347359.2to $120 $41,5801552498ft feet 1.23321.0 Vertical Change REF8322.0to137644 8 ft feet 2.0-3.0359.2 Cross Slope (PAR)SF11360.6to $120 $1,2601552508ft feet .32363.8 Vertical Change LF8364.8to $75 $5631376458ft feet 4.0-5.0366.2 Cross Slope (PAR)SF20368.9to $120 $2,4301552518ft feet 2.0-3.0370.3 Cross Slope (PAR)SF38375.3to $120 $4,5001552528ft feet 2.0-3.0378.2 Cross Slope (PAR)SF41383.6to $120 $4,8601552538ft feet 2.0-3.0392.3 Cross Slope (PAR)SF30396.3to $120 $3,6001552548ft feet 2.0-3.0398.9 Cross Slope (PAR)SF100412.2to $120 $11,9701552558ft feet 2.0-3.0419.5 Cross Slope (PAR)SF14421.3to $120 $1,6201552568ft feet .26430.3 Vertical Change LF8431.3to $75 $5631376468ft feet 2.0-3.0447.4 Cross Slope (PAR)SF59455.2to $120 $7,0201552578ft feet 2.0-3.0469.8 Cross Slope (PAR)SF27473.4to $120 $3,2401552588ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 553 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SOTO ST Survey Street Name Starting Street Name EAST SIDE OF LA RIVER End Street Name 2001151231 Run ID Bandini Blvd 105.75 ID Sidewalk Width Priority feet 2.0-3.0482.2 Cross Slope (PAR)SF23485.3to $120 $2,7901552598ft feet 2.0-3.0488.3 Cross Slope (PAR)SF59496.2to $120 $7,1101552608ft feet 2.0-3.0502.0 Cross Slope (PAR)SF8503.1to $120 $9901552618ft feet 2.0-3.0510.4 Cross Slope (PAR)SF17512.7to $120 $2,0701552628ft feet 2.0-3.0518.0 Cross Slope (PAR)SF163539.8to $120 $19,6201552638ft feet 2.0-3.0543.0 Cross Slope (PAR)SF28546.8to $120 $3,4201552648ft feet 2.0-3.0555.6 Cross Slope (PAR)SF161577.0to $120 $19,2601552658ft feet 2.0-3.0590.8 Cross Slope (PAR)SF47597.1to $120 $5,6701552668ft feet 3.0-4.0599.5 Cross Slope (PAR)SF11601.0to $120 $1,3501552678ft feet 2.0-3.0601.0 Cross Slope (PAR)SF38606.0to $120 $4,5001552688ft feet 2.0-3.0618.6 Cross Slope (PAR)SF57626.2to $120 $6,8401552698ft feet 2.0-3.0628.9 Cross Slope (PAR)SF30632.9to $120 $3,6001552708ft feet 2.0-3.0641.2 Cross Slope (PAR)SF38646.3to $120 $4,5901552718ft feet 2.0-3.0650.8 Cross Slope (PAR)SF71660.3to $120 $8,5501552728ft feet 2.0-3.0665.3 Cross Slope (PAR)SF31669.4to $120 $3,6901552738ft feet 2.0-3.0676.3 Cross Slope (PAR)SF43682.0to $120 $5,1301552748ft feet 2.0-3.0689.4 Cross Slope (PAR)SF96702.2to $120 $11,5201552758ft feet .52691.7 Vertical Change REF8692.7to137647 8 ft feet 3.0-4.0704.3 Cross Slope (PAR)SF12705.9to $120 $1,4401552768ft feet 2.0-3.0707.6 Cross Slope (PAR)SF36712.4to $120 $4,3201552778ft feet 2.0-3.0716.4 Cross Slope (PAR)SF15718.4to $120 $1,8001552788ft feet 3.0-4.0722.8 Cross Slope (PAR)SF23725.9to $120 $2,7901552798ft feet 2.0-3.0725.9 Cross Slope (PAR)SF43731.6to $120 $5,1301552808ft feet 2.0-3.0736.2 Cross Slope (PAR)SF117751.8to $120 $14,0401552818ft feet 2.0-3.0764.8 Cross Slope (PAR)SF38769.9to $120 $4,5901552828ft feet 2.0-3.0776.5 Cross Slope (PAR)SF137794.8to $120 $16,4701552838ft feet .96782.6 Vertical Change REF8783.6to137648 8 ft feet 2.0-3.0805.3 Cross Slope (PAR)SF94817.8to $120 $11,2501552848ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 554 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SOTO ST Survey Street Name Starting Street Name EAST SIDE OF LA RIVER End Street Name 2001151231 Run ID Bandini Blvd 105.75 ID Sidewalk Width Priority feet 2.0-3.0822.5 Cross Slope (PAR)SF61830.6to $120 $7,2901552858ft feet 2.0-3.0855.9 Cross Slope (PAR)SF59863.8to $120 $7,1101552868ft feet 2.0-3.0880.2 Cross Slope (PAR)SF128897.2to $120 $15,3001552878ft feet 3.0-4.0905.8 Cross Slope (PAR)SF27909.4to $120 $3,2401552888ft feet 2.0-3.0910.5 Cross Slope (PAR)SF14912.3to $120 $1,6201552898ft feet 2.0-3.0916.9 Cross Slope (PAR)SF26920.3to $120 $3,0601552908ft feet 2.0-3.0939.0 Cross Slope (PAR)SF29942.8to $120 $3,4201552918ft feet 2.0-3.0952.5 Cross Slope (PAR)SF46958.6to $120 $5,4901552928ft feet 2.0-3.0961.5 Cross Slope (PAR)SF40966.8to $120 $4,7701552938ft feet 2.0-3.0970.5 Cross Slope (PAR)SF14972.3to $120 $1,6201552948ft feet 2.0-3.0978.1 Cross Slope (PAR)SF59986.0to $120 $7,1101552958ft feet 2.0-3.0991.9 Cross Slope (PAR)SF10993.2to $120 $1,1701552968ft feet 2.0-3.0997.8 Cross Slope (PAR)SF201000.4to $120 $2,3401552978ft feet 2.0-3.01006.2 Cross Slope (PAR)SF551013.5to $120 $6,5701552988ft feet 5.0-6.01020.6 Running Slope REF261024.1to166537 8 ft feet 6.0-7.01021.3 Cross Slope (PAR)SF201024.0to $120 $2,4301552998ft $521,550.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:S SOTO ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 555 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S SUNOL DR Survey Street Name Starting Street Name BONNIE BEACH PL End Street Name 2001161309 Run ID Bandini Blvd 46 ID Sidewalk Width Priority feet 2.0-3.00.1 Cross Slope (PAR)SF333.6to $120 $3,99015671510ft feet 2.0-3.07.0 Cross Slope (PAR)SF279.8to $120 $3,19215671610ft feet 2.0-3.032.3 Cross Slope (PAR)SF13746.7to $120 $16,41615671710ft feet 2.0-3.050.2 Cross Slope (PAR)SF1051.2to $120 $1,14015671810ft feet -.2760.8 Vertical Change LF1061.8to $75 $71313792410ft feet 2.0-3.069.0 Cross Slope (PAR)SF8878.3to $120 $10,60215671910ft feet 2.0-3.084.7 Cross Slope (PAR)SF6091.0to $120 $7,18215672010ft feet 2.0-3.095.3 Cross Slope (PAR)SF85104.2to $120 $10,14615672110ft feet 2.0-3.0108.0 Cross Slope (PAR)SF118120.4to $120 $14,13615672210ft feet 2.0-3.0129.3 Cross Slope (PAR)SF25131.9to $120 $2,96415672310ft feet 2.0-3.0135.4 Cross Slope (PAR)SF18137.3to $120 $2,16615672410ft feet 2.0-3.0142.2 Cross Slope (PAR)SF86151.3to $120 $10,37415672510ft feet 2.0-3.0158.9 Cross Slope (PAR)SF22161.2to $120 $2,62215672610ft feet 2.0-3.0166.8 Cross Slope (PAR)SF14168.3to $120 $1,71015672710ft feet 2.0-3.0175.0 Cross Slope (PAR)SF107186.3to $120 $12,88215672810ft feet 2.0-3.0206.0 Cross Slope (PAR)SF25208.6to $120 $2,96415672910ft feet209.0 Driveway260.7to165896 feet 2.0-3.0263.2 Cross Slope (PAR)SF29266.2to $120 $3,42015673010ft feet 2.0-3.0272.8 Cross Slope (PAR)SF29275.9to $120 $3,53415673110ft feet 2.0-3.0281.8 Cross Slope (PAR)SF76289.8to $120 $9,12015673210ft feet 2.0-3.0293.8 Cross Slope (PAR)SF181312.8to $120 $21,66015673310ft feet 2.0-3.0315.2 Cross Slope (PAR)SF478365.5to $120 $57,34215673410ft feet 2.0-3.0369.7 Cross Slope (PAR)SF11370.9to $120 $1,36815673510ft feet371.8 Driveway416.6to165897 feet 2.0-3.0420.5 Cross Slope (PAR)SF103431.3to $120 $12,31215673610ft feet440.9 Driveway471.9to165898 feet 2.0-3.0473.8 Cross Slope (PAR)SF76481.8to $120 $9,12015673710ft feet 4.0-5.0481.8 Cross Slope (PAR)SF90491.3to $120 $10,83015673810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 556 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side S SUNOL DR Survey Street Name Starting Street Name BONNIE BEACH PL End Street Name 2001161309 Run ID Bandini Blvd 46 ID Sidewalk Width Priority feet 2.0-3.0491.3 Cross Slope (PAR)SF28494.2to $120 $3,30615673910ft feet 4.0-5.0495.9 Cross Slope (PAR)SF35499.6to $120 $4,21815674010ft feet 2.0-3.0500.5 Cross Slope (PAR)SF107511.8to $120 $12,88215674110ft feet 2.0-3.0526.3 Cross Slope (PAR)SF30529.5to $120 $3,64815674210ft feet 4.0-5.0530.8 Cross Slope (PAR)SF107542.1to $120 $12,88215674310ft feet 6.0-7.0544.1 Cross Slope (PAR)SF121556.8to $120 $14,47815674410ft feet .44549.2 Vertical Change REF10550.2to137925 10 ft feet 5.0-6.0556.8 Cross Slope (PAR)SF24559.3to $120 $2,85015674510ft feet 3.0-4.0559.3 Cross Slope (PAR)SF62565.8to $120 $7,41015674610ft feet 2.0-3.0565.8 Cross Slope (PAR)SF16567.5to $120 $1,93815674710ft feet 3.0-4.0571.6 Cross Slope (PAR)SF23574.0to $120 $2,73615674810ft feet 2.0-3.0574.0 Cross Slope (PAR)SF67581.1to $120 $8,09415674910ft $306,346.50TOTAL COST FOR:BANDINI BLVDNside of Starting at:S SUNOL DR October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 557 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SUNOL DR Survey Street Name Starting Street Name AYERS AVE End Street Name 2001171034 Run ID Bandini Blvd 106.25 ID Sidewalk Width Priority feet .262.2 Vertical Change LF93.2to $75 $71313823910ft feet 2.0-3.06.8 Cross Slope (PAR)SF10517.8to $120 $12,54015853910ft feet 1.2922.8 Vertical Change REF1023.8to138240 10 ft feet 2.0-3.023.4 Cross Slope (PAR)SF1424.9to $120 $1,71015854010ft feet 2.0-3.029.7 Cross Slope (PAR)SF1231.0to $120 $1,48215854110ft feet 2.0-3.033.3 Cross Slope (PAR)SF6440.0to $120 $7,63815854210ft feet .6247.8 Vertical Change SF1048.8to $75 $71313824110ft feet 2.0-3.056.5 Cross Slope (PAR)SF3860.5to $120 $4,56015854310ft feet 2.0-3.063.0 Cross Slope (PAR)SF6069.3to $120 $7,18215854410ft feet 5.0-6.067.6 Running Slope REF1168.8to166628 10 ft feet69.3 Driveway90.8to165983 feet 3.0-4.090.8 Cross Slope (Driveway)SF4095.0to $40 $1,59615854510ft feet 5.0-6.095.0 Cross Slope (PAR)SF3698.8to $120 $4,33215854610ft feet 3.0-4.098.8 Cross Slope (PAR)SF18100.7to $120 $2,16615854710ft feet 2.0-3.0100.9 Cross Slope (PAR)SF106112.1to $120 $12,76815854810ft feet 4.0-5.0112.7 Cross Slope (PAR)SF78120.9to $120 $9,34815854910ft feet 2.0-3.0121.9 Cross Slope (PAR)SF25124.5to $120 $2,96415855010ft feet 4.0-5.0131.8 Cross Slope (PAR)SF14133.3to $120 $1,71015855110ft feet 2.0-3.0138.3 Cross Slope (PAR)SF12139.6to $120 $1,48215855210ft feet 2.0-3.0142.3 Cross Slope (PAR)SF10143.4to $120 $1,25415855310ft feet 4.0-5.0146.0 Cross Slope (PAR)SF28148.9to $120 $3,30615855410ft feet .43146.7 Vertical Change REF10147.7to138242 10 ft feet 2.0-3.0149.8 Cross Slope (PAR)SF237174.8to $120 $28,50015855510ft feet 4.0-5.0174.8 Cross Slope (PAR)SF12176.1to $120 $1,48215855610ft feet 2.0-3.0178.2 Cross Slope (PAR)SF10179.3to $120 $1,25415855710ft feet 3.0-4.0181.7 Cross Slope (PAR)SF10182.8to $120 $1,25415855810ft feet 2.34183.5 Vertical Change SF10184.5to $75 $71313824310ft feet 2.0-3.0185.3 Cross Slope (PAR)SF89194.7to $120 $10,71615855910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 558 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SUNOL DR Survey Street Name Starting Street Name AYERS AVE End Street Name 2001171034 Run ID Bandini Blvd 106.25 ID Sidewalk Width Priority feet197.3 Driveway227.7to165984 feet .31227.3 Vertical Change REF10228.3to138244 10 ft feet 4.0-5.0227.8 Cross Slope (Driveway)SF19229.8to $40 $76015856010ft feet 2.0-3.0230.5 Cross Slope (PAR)SF73238.2to $120 $8,77815856110ft feet 3.0-4.0242.2 Cross Slope (PAR)SF50247.5to $120 $6,04215856210ft feet 2.0-3.0247.5 Cross Slope (PAR)SF16249.2to $120 $1,93815856310ft feet 5.0-6.0248.0 Running Slope REF20250.1to166629 10 ft feet250.3 Driveway283.8to165985 feet 2.0-3.0285.9 Cross Slope (PAR)SF64292.6to $120 $7,63815856410ft feet 4.0-5.0292.6 Cross Slope (PAR)SF10293.7to $120 $1,25415856510ft feet .37299.4 Vertical Change LF10300.4to $75 $71313824510ft feet 2.0-3.0302.5 Cross Slope (PAR)SF108313.9to $120 $12,99615856610ft feet 2.0-3.0319.2 Cross Slope (PAR)SF26321.9to $120 $3,07815856710ft feet 4.0-5.0321.9 Cross Slope (PAR)SF21324.1to $120 $2,50815856810ft feet 2.0-3.0326.4 Cross Slope (PAR)SF46331.2to $120 $5,47215856910ft feet 5.0-6.0332.8 Cross Slope (PAR)SF21335.0to $120 $2,50815857010ft feet 2.0-3.0336.8 Cross Slope (PAR)SF33340.3to $120 $3,99015857110ft feet 2.0-3.0344.8 Cross Slope (PAR)SF100355.3to $120 $11,97015857210ft feet 3.45352.4 Vertical Change REF10353.4to138246 10 ft feet 2.0-3.0361.8 Cross Slope (PAR)SF47366.7to $120 $5,58615857310ft feet 4.0-5.0367.0 Cross Slope (PAR)SF24369.5to $120 $2,85015857410ft feet 3.0-4.0371.9 Cross Slope (PAR)SF21374.1to $120 $2,50815857510ft feet374.3 Driveway406.5to165986 feet -.28385.9 Vertical Change REF10386.9to138247 10 ft feet 2.0-3.0408.3 Cross Slope (PAR)SF34411.9to $120 $4,10415857610ft feet413.5 Driveway436.3to165987 feet 2.0-3.0439.7 Cross Slope (PAR)SF79448.0to $120 $9,46215857710ft feet 4.0-5.0448.4 Cross Slope (PAR)SF42452.8to $120 $5,01615857810ft feet -.28455.6 Vertical Change LF10456.6to $75 $71313824810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 559 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SUNOL DR Survey Street Name Starting Street Name AYERS AVE End Street Name 2001171034 Run ID Bandini Blvd 106.25 ID Sidewalk Width Priority feet 3.0-4.0457.6 Cross Slope (PAR)SF18459.5to $120 $2,16615857910ft feet 2.0-3.0461.8 Cross Slope (PAR)SF24464.3to $120 $2,85015858010ft feet 3.0-4.0468.2 Cross Slope (PAR)SF76476.2to $120 $9,12015858110ft feet .28474.8 Vertical Change REF10475.8to138249 10 ft feet 2.0-3.0476.9 Cross Slope (PAR)SF37480.8to $120 $4,44615858210ft feet 2.0-3.0484.8 Cross Slope (PAR)SF14486.3to $120 $1,71015858310ft feet .35490.3 Vertical Change LF10491.3to $75 $71313825010ft feet .28495.4 Vertical Change LF10496.4to $75 $71313825110ft feet 2.0-3.0498.6 Cross Slope (PAR)SF26501.3to $120 $3,07815858410ft feet 4.0-5.0504.7 Cross Slope (PAR)SF78512.9to $120 $9,34815858510ft feet .89512.0 Vertical Change REF10513.0to138252 10 ft feet 4.0-5.0516.5 Cross Slope (PAR)SF27519.3to $120 $3,19215858610ft feet -.36519.3 Vertical Change REF10520.3to138253 10 ft feet519.3 Driveway554.7to165988 feet 1.01554.7 Vertical Change REF10555.7to138254 10 ft feet 4.0-5.0554.7 Cross Slope (Driveway)SF15556.3to $40 $60815858710ft feet 4.0-5.0558.8 Cross Slope (PAR)SF79567.1to $120 $9,46215858810ft feet 6.0-7.0568.1 Cross Slope (PAR)SF32571.5to $120 $3,87615858910ft feet 4.0-5.0573.2 Cross Slope (PAR)SF35576.9to $120 $4,21815859010ft feet 2.0-3.0579.1 Cross Slope (PAR)SF13580.5to $120 $1,59615859110ft feet 4.0-5.0581.8 Cross Slope (PAR)SF49587.0to $120 $5,92815859210ft feet .3584.1 Vertical Change REF10585.1to138255 10 ft feet 2.0-3.0598.8 Cross Slope (PAR)SF40603.0to $120 $4,78815859310ft feet 3.0-4.0605.2 Cross Slope (PAR)SF64611.9to $120 $7,63815859410ft feet 2.0-3.0619.2 Cross Slope (PAR)SF17621.0to $120 $2,05215859510ft feet 4.0-5.0621.4 Cross Slope (PAR)SF35625.1to $120 $4,21815859610ft feet 2.0-3.0626.4 Cross Slope (PAR)SF10627.5to $120 $1,25415859710ft feet 3.0-4.0629.8 Cross Slope (PAR)SF32633.2to $120 $3,87615859810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 560 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SUNOL DR Survey Street Name Starting Street Name AYERS AVE End Street Name 2001171034 Run ID Bandini Blvd 106.25 ID Sidewalk Width Priority feet 4.0-5.0636.0 Cross Slope (PAR)SF60642.3to $120 $7,18215859910ft feet 3.0-4.0645.5 Cross Slope (PAR)SF18647.4to $120 $2,16615860010ft feet 3.0-4.0653.5 Cross Slope (PAR)SF24656.0to $120 $2,85015860110ft feet 2.0-3.0659.5 Cross Slope (PAR)SF23661.9to $120 $2,73615860210ft feet 3.0-4.0680.1 Cross Slope (PAR)SF11681.3to $120 $1,36815860310ft feet 2.0-3.0686.2 Cross Slope (PAR)SF10687.2to $120 $1,14015860410ft feet 3.0-4.0702.5 Cross Slope (PAR)SF80710.9to $120 $9,57615860510ft feet 2.0-3.0711.5 Cross Slope (PAR)SF18713.4to $120 $2,16615860610ft feet 2.0-3.0715.8 Cross Slope (PAR)SF17717.6to $120 $2,05215860710ft feet .75724.4 Vertical Change SF10725.4to $75 $71313825610ft feet 2.0-3.0728.0 Cross Slope (PAR)SF51733.4to $120 $6,15615860810ft feet 3.0-4.0735.6 Cross Slope (PAR)SF17737.4to $120 $2,05215860910ft feet 4.0-5.0739.8 Cross Slope (PAR)SF10740.9to $120 $1,25415861010ft feet 3.0-4.0743.1 Cross Slope (PAR)SF26745.8to $120 $3,07815861110ft feet 2.0-3.0757.3 Cross Slope (PAR)SF34760.9to $120 $4,10415861210ft feet 2.0-3.0766.2 Cross Slope (PAR)SF13767.6to $120 $1,59615861310ft feet 2.0-3.0771.5 Cross Slope (PAR)SF11772.7to $120 $1,36815861410ft feet 3.0-4.0774.8 Cross Slope (PAR)SF13776.2to $120 $1,59615861510ft feet 2.0-3.0789.3 Cross Slope (PAR)SF47794.2to $120 $5,58615861610ft feet 3.0-4.0798.8 Cross Slope (PAR)SF10799.8to $120 $1,14015861710ft feet 2.0-3.0799.8 Cross Slope (PAR)SF10800.8to $120 $1,14015861810ft feet 2.0-3.0803.7 Cross Slope (PAR)SF82812.3to $120 $9,80415861910ft feet 2.0-3.0815.6 Cross Slope (PAR)SF20817.7to $120 $2,39415862010ft feet 2.0-3.0826.2 Cross Slope (PAR)SF67833.3to $120 $8,09415862110ft feet .65845.3 Vertical Change SF10846.3to $75 $71313825710ft feet 4.0-5.0849.7 Cross Slope (PAR)SF10850.8to $120 $1,25415862210ft feet 5.0-6.0853.1 Cross Slope (PAR)SF29856.2to $120 $3,53415862310ft feet 3.0-4.0860.9 Cross Slope (PAR)SF31864.2to $120 $3,76215862410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 561 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side S SUNOL DR Survey Street Name Starting Street Name AYERS AVE End Street Name 2001171034 Run ID Bandini Blvd 106.25 ID Sidewalk Width Priority feet 2.0-3.0865.8 Cross Slope (PAR)SF14867.3to $120 $1,71015862510ft feet 3.0-4.0870.9 Cross Slope (PAR)SF151886.8to $120 $18,12615862610ft feet 6.0-7.0888.8 Cross Slope (PAR)SF17890.6to $120 $2,05215862710ft feet -.37890.0 Vertical Change REF10891.0to138258 10 ft feet 4.0-5.0892.8 Cross Slope (PAR)SF39896.9to $120 $4,67415862810ft feet 2.0-3.0899.2 Cross Slope (PAR)SF50904.5to $120 $6,04215862910ft feet 4.0-5.0905.4 Cross Slope (PAR)SF67912.5to $120 $8,09415863010ft feet 2.0-3.0914.6 Cross Slope (PAR)SF30917.8to $120 $3,64815863110ft feet 4.0-5.0918.7 Cross Slope (PAR)SF93928.5to $120 $11,17215863210ft feet 3.0-4.0936.8 Cross Slope (PAR)SF30940.0to $120 $3,64815863310ft feet 5.0-6.0949.5 Cross Slope (PAR)SF11950.7to $120 $1,36815863410ft feet 2.0-3.0959.3 Cross Slope (PAR)SF18961.2to $120 $2,16615863510ft feet 2.0-3.0971.3 Cross Slope (PAR)SF266999.3to $120 $31,92015863610ft feet 3.0-4.01002.7 Cross Slope (PAR)SF171004.5to $120 $2,05215863710ft feet 2.0-3.01005.0 Cross Slope (PAR)SF481010.1to $120 $5,81415863810ft feet 3.0-4.01015.8 Cross Slope (PAR)SF681023.0to $120 $8,20815863910ft feet 4.0-5.01026.9 Cross Slope (PAR)SF511032.3to $120 $6,15615864010ft feet 3.0-4.01035.4 Cross Slope (PAR)SF101036.5to $120 $1,25415864110ft feet 2.0-3.01038.4 Cross Slope (PAR)SF371042.3to $120 $4,44615864210ft feet 4.0-5.01043.8 Cross Slope (PAR)SF101044.9to $120 $1,25415864310ft feet 2.0-3.01046.0 Cross Slope (PAR)SF1411060.8to $120 $16,87215864410ft feet 5.0-6.01058.8 Running Slope REF141060.3to166630 10 ft $539,362.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:S SUNOL DR October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 562 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001161625 Run ID Bandini Blvd 74.5 ID Sidewalk Width Priority feet 7.0-8.00.3 Cross Slope (PAR)SF121.6to $120 $1,48215600010ft feet 9.0-10.02.3 Cross Slope (PAR)SF10913.8to $120 $13,11015600110ft feet 7.0-8.015.6 Cross Slope (PAR)SF1016.6to $120 $1,14015600210ft feet 9.0-10.018.1 Cross Slope (PAR)SF2620.8to $120 $3,07815600310ft feet 2.0-3.028.3 Cross Slope (PAR)SF2530.9to $120 $2,96415600410ft feet 2.0-3.038.3 Cross Slope (PAR)SF1740.1to $120 $2,05215600510ft feet 2.0-3.044.1 Cross Slope (PAR)SF1045.1to $120 $1,14015600610ft feet 2.0-3.051.9 Cross Slope (PAR)SF1653.6to $120 $1,93815600710ft feet 3.0-4.060.3 Cross Slope (PAR)SF1361.7to $120 $1,59615600810ft feet62.2 Driveway88.8to165852 $28,500.00TOTAL COST FOR:BANDINI BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 563 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161642 Run ID Bandini Blvd 96.25 ID Sidewalk Width Priority feet 8.0-9.01.7 Cross Slope (PAR)SF10512.8to $120 $12,65415591410ft feet 3.0-4.016.9 Cross Slope (PAR)SF9827.2to $120 $11,74215591510ft feet 3.0-4.029.3 Cross Slope (PAR)SF3633.1to $120 $4,33215591610ft feet 1.8332.0 Vertical Change REF1033.0to137763 10 ft feet 2.0-3.033.1 Cross Slope (PAR)SF1434.6to $120 $1,71015591710ft feet 1.2936.3 Vertical Change SF1037.3to $75 $71313776410ft feet 2.0-3.038.3 Cross Slope (PAR)SF5343.9to $120 $6,38415591810ft feet 3.0-4.047.7 Cross Slope (PAR)SF1549.3to $120 $1,82415591910ft feet 2.0-3.050.0 Cross Slope (PAR)SF2252.3to $120 $2,62215592010ft feet 2.0-3.054.5 Cross Slope (PAR)SF1756.3to $120 $2,05215592110ft feet 4.0-5.057.1 Cross Slope (PAR)SF15473.3to $120 $18,46815592210ft feet 2.0-3.074.4 Cross Slope (PAR)SF6581.2to $120 $7,75215592310ft feet 4.0-5.081.6 Cross Slope (PAR)SF3885.6to $120 $4,56015592410ft feet 2.0-3.085.6 Cross Slope (PAR)SF1186.8to $120 $1,36815592510ft feet 4.0-5.090.9 Cross Slope (PAR)SF2993.9to $120 $3,42015592610ft feet 4.0-5.097.0 Cross Slope (PAR)SF31100.3to $120 $3,76215592710ft feet 2.0-3.0106.0 Cross Slope (PAR)SF78114.2to $120 $9,34815592810ft feet 3.0-4.0116.8 Cross Slope (PAR)SF43121.3to $120 $5,13015592910ft feet 2.0-3.0121.9 Cross Slope (PAR)SF105133.0to $120 $12,65415593010ft feet 2.0-3.0136.6 Cross Slope (PAR)SF97146.8to $120 $11,62815593110ft feet 6.0-7.0138.5 Running Slope SF12139.8to $120 $1,48216654810ft feet 2.0-3.0156.9 Cross Slope (PAR)SF23159.3to $120 $2,73615593210ft feet 3.0-4.0161.4 Cross Slope (PAR)SF40165.6to $120 $4,78815593310ft feet 2.0-3.0167.6 Cross Slope (PAR)SF125180.8to $120 $15,04815593410ft feet 3.0-4.0183.8 Cross Slope (PAR)SF23186.2to $120 $2,73615593510ft feet 2.0-3.0186.2 Cross Slope (PAR)SF29189.3to $120 $3,53415593610ft feet190.4 Driveway208.8to165847 feet 2.0-3.0209.1 Cross Slope (Driveway)SF16210.8to $40 $64615593710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 564 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161642 Run ID Bandini Blvd 96.25 ID Sidewalk Width Priority feet 4.0-5.0211.4 Cross Slope (PAR)SF97221.6to $120 $11,62815593810ft feet 4.0-5.0223.8 Cross Slope (PAR)SF53229.4to $120 $6,38415593910ft feet 2.0-3.0229.6 Cross Slope (PAR)SF78237.8to $120 $9,34815594010ft feet 2.0-3.0248.8 Cross Slope (PAR)SF10249.9to $120 $1,25415594110ft feet 2.0-3.0254.3 Cross Slope (PAR)SF67261.3to $120 $7,98015594210ft feet 3.0-4.0266.8 Cross Slope (PAR)SF57272.8to $120 $6,84015594310ft feet 2.0-3.0272.8 Cross Slope (PAR)SF200293.9to $120 $24,05415594410ft feet -.26276.4 Vertical Change REF10277.4to137765 10 ft feet 2.0-3.0302.7 Cross Slope (PAR)SF89312.1to $120 $10,71615594510ft feet 2.0-3.0317.8 Cross Slope (PAR)SF10318.8to $120 $1,14015594610ft feet 4.0-5.0320.4 Cross Slope (PAR)SF105331.5to $120 $12,65415594710ft feet 2.0-3.0331.5 Cross Slope (PAR)SF10332.6to $120 $1,25415594810ft feet 2.0-3.0339.1 Cross Slope (PAR)SF39343.2to $120 $4,67415594910ft feet .28340.6 Vertical Change REF50345.9to137766 10 ft feet 2.0-3.0346.5 Cross Slope (PAR)SF116358.7to $120 $13,90815595010ft feet .61358.8 Vertical Change SF10359.8to $75 $71313776710ft feet 3.0-4.0366.0 Cross Slope (PAR)SF38370.0to $120 $4,56015595110ft feet 2.0-3.0370.0 Cross Slope (PAR)SF46374.8to $120 $5,47215595210ft feet 2.0-3.0377.2 Cross Slope (PAR)SF22379.5to $120 $2,62215595310ft feet 3.0-4.0383.8 Cross Slope (PAR)SF99394.2to $120 $11,85615595410ft feet 2.0-3.0395.4 Cross Slope (PAR)SF10396.4to $120 $1,14015595510ft feet .26397.2 Vertical Change LF10398.2to $75 $71313776810ft feet 2.0-3.0402.4 Cross Slope (PAR)SF120415.0to $120 $14,36415595610ft feet 2.0-3.0422.8 Cross Slope (PAR)SF45427.5to $120 $5,35815595710ft feet 1.41427.2 Vertical Change REF10428.2to137769 10 ft feet .42429.6 Vertical Change LF10430.6to $75 $71313777010ft feet 2.0-3.0432.0 Cross Slope (PAR)SF22434.3to $120 $2,62215595810ft feet -.28433.2 Vertical Change REF10434.2to137771 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 565 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161642 Run ID Bandini Blvd 96.25 ID Sidewalk Width Priority feet 2.0-3.0442.3 Cross Slope (PAR)SF45447.0to $120 $5,35815595910ft feet 3.0-4.0449.3 Cross Slope (PAR)SF170467.2to $120 $20,40615596010ft feet 4.0-5.0471.3 Cross Slope (PAR)SF37475.2to $120 $4,44615596110ft feet 3.0-4.0477.7 Cross Slope (PAR)SF70485.1to $120 $8,43615596210ft feet 1.2484.1 Vertical Change REF10485.1to137772 10 ft feet 5.0-6.0486.8 Cross Slope (PAR)SF102497.5to $120 $12,19815596310ft feet 2.0-3.0498.4 Cross Slope (PAR)SF14499.9to $120 $1,71015596410ft feet 2.0-3.0504.1 Cross Slope (PAR)SF143519.2to $120 $17,21415596510ft feet 2.0-3.0523.0 Cross Slope (PAR)SF10524.1to $120 $1,25415596610ft feet -.3526.6 Vertical Change REF10527.6to137773 10 ft feet 2.0-3.0527.2 Cross Slope (PAR)SF21529.4to $120 $2,50815596710ft feet 6.0-7.0527.4 Running Slope REF10528.4to166549 10 ft feet 2.0-3.0537.3 Cross Slope (PAR)SF22539.6to $120 $2,62215596810ft feet 2.0-3.0542.6 Cross Slope (PAR)SF58548.7to $120 $6,95415596910ft feet 2.0-3.0550.8 Cross Slope (PAR)SF29553.8to $120 $3,42015597010ft feet 2.0-3.0559.3 Cross Slope (PAR)SF67566.4to $120 $8,09415597110ft feet 3.0-4.0569.3 Cross Slope (PAR)SF187589.0to $120 $22,45815597210ft feet 2.0-3.0589.3 Cross Slope (PAR)SF104600.2to $120 $12,42615597310ft feet 2.0-3.0604.8 Cross Slope (PAR)SF95614.8to $120 $11,40015597410ft feet 2.0-3.0617.5 Cross Slope (PAR)SF12618.8to $120 $1,48215597510ft feet621.2 Driveway640.8to165848 feet 5.0-6.0640.8 Cross Slope (Driveway)SF38644.8to $40 $1,52015597610ft feet 4.0-5.0648.9 Cross Slope (PAR)SF132662.8to $120 $15,84615597710ft feet 3.0-4.0665.3 Cross Slope (PAR)SF74673.1to $120 $8,89215597810ft feet 3.0-4.0676.9 Cross Slope (PAR)SF42681.3to $120 $5,01615597910ft feet 3.0-4.0684.5 Cross Slope (PAR)SF68691.7to $120 $8,20815598010ft feet 2.0-3.0693.2 Cross Slope (PAR)SF166710.7to $120 $19,95015598110ft feet 4.0-5.0712.3 Cross Slope (PAR)SF29715.3to $120 $3,42015598210ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 566 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3768 BANDINI BLVD End Street Name 2001161642 Run ID Bandini Blvd 96.25 ID Sidewalk Width Priority feet 2.0-3.0725.6 Cross Slope (PAR)SF43730.1to $120 $5,13015598310ft feet 4.0-5.0731.5 Cross Slope (PAR)SF81740.0to $120 $9,69015598410ft feet 2.0-3.0741.1 Cross Slope (PAR)SF187760.8to $120 $22,45815598510ft feet -.34760.3 Vertical Change REF10761.3to137776 10 ft feet 4.0-5.0761.3 Cross Slope (PAR)SF421805.6to $120 $50,50215598610ft feet806.4 Driveway827.2to165849 feet 4.0-5.0827.2 Cross Slope (Driveway)SF76835.2to $40 $3,04015598710ft feet 4.0-5.0840.8 Cross Slope (PAR)SF38844.8to $120 $4,56015598810ft feet 4.0-5.0848.5 Cross Slope (PAR)SF11849.7to $120 $1,36815598910ft feet 4.0-5.0857.2 Cross Slope (PAR)SF39861.3to $120 $4,67415599010ft feet 5.0-6.0864.9 Cross Slope (PAR)SF12866.2to $120 $1,48215599110ft feet 4.0-5.0869.0 Cross Slope (PAR)SF98879.3to $120 $11,74215599210ft feet .38879.8 Vertical Change LF10880.8to $75 $71313777710ft feet880.7 Driveway897.9to165850 feet 4.0-5.0897.9 Cross Slope (Driveway)SF171915.9to $40 $6,84015599310ft feet -.3906.6 Vertical Change REF10907.6to137778 10 ft feet 5.0-6.0918.8 Cross Slope (PAR)SF30922.0to $120 $3,64815599410ft feet 3.0-4.0922.2 Cross Slope (PAR)SF147937.7to $120 $17,67015599510ft feet 5.0-6.0938.3 Cross Slope (PAR)SF44942.9to $120 $5,24415599610ft feet946.5 Driveway970.4to165851 feet 3.0-4.0970.4 Cross Slope (Driveway)SF197991.1to $40 $7,86615599710ft feet 5.0-6.0991.1 Cross Slope (PAR)SF11992.3to $120 $1,36815599810ft feet 6.0-7.0992.3 Cross Slope (PAR)SF16994.0to $120 $1,93815599910ft $680,228.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 567 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side SIERRA PINE AVE Survey Street Name Starting Street Name 2939 BANDINI BLVD End Street Name 2001151554 Run ID Bandini Blvd 68 ID Sidewalk Width Priority feet 5.0-6.00.7 Cross Slope (PAR)SF82.5to $120 $9721541125ft feet2.8 Continuous Width REF53.8to167319 5 ft feet 3.0-4.05.5 Cross Slope (PAR)SF209.9to $120 $2,3761541135ft feet14.0 Continuous Width SF515.0to $120 $5401669995ft feet 3.0-4.015.3 Cross Slope (PAR)SF516.3to $120 $5401541145ft feet 2.0-3.017.6 Cross Slope (PAR)SF1520.9to $120 $1,7821541155ft feet42.5 Driveway77.0to165718 feet 3.0-4.079.0 Cross Slope (PAR)SF680.3to $120 $7021541165ft feet 2.0-3.080.3 Cross Slope (PAR)SF1082.6to $120 $1,2421541175ft feet 2.0-3.087.4 Cross Slope (PAR)SF1189.9to $120 $1,3501541185ft feet 4.0-5.091.2 Cross Slope (PAR)SF53103.0to $120 $6,3721541195ft feet .2791.4 Vertical Change REF592.4to137438 5 ft feet 3.0-4.0109.5 Cross Slope (PAR)SF7111.1to $120 $8641541205ft feet 2.0-3.0114.3 Cross Slope (PAR)SF26120.1to $120 $3,1321541215ft feet 3.0-4.0122.4 Cross Slope (PAR)SF15125.7to $120 $1,7821541225ft feet128.3 Driveway146.4to165719 feet163.9 Driveway197.1to165720 feet 4.0-5.0198.0 Cross Slope (PAR)SF14201.1to $120 $1,6741541235ft feet 2.0-3.0207.3 Cross Slope (PAR)SF15210.7to $120 $1,8361541245ft feet 3.0-4.0213.5 Cross Slope (PAR)SF42222.8to $120 $5,0221541255ft feet 5.0-6.0224.4 Cross Slope (PAR)SF16227.9to $120 $1,8901541265ft feet 2.0-3.0230.7 Cross Slope (PAR)SF11233.1to $120 $1,2961541275ft feet 4.0-5.0233.1 Cross Slope (PAR)SF14236.3to $120 $1,7281541285ft feet236.3 Driveway269.8to165721 feet 4.0-5.0271.6 Cross Slope (PAR)SF26277.3to $120 $3,0781541295ft feet 4.0-5.0288.1 Cross Slope (PAR)SF25293.6to $120 $2,9701541305ft feet 2.0-3.0301.3 Cross Slope (PAR)SF9303.3to $120 $1,0801541315ft feet 2.0-3.0308.3 Cross Slope (PAR)SF18312.3to $120 $2,1601541325ft feet 2.0-3.0316.0 Cross Slope (PAR)SF17319.8to $120 $2,0521541335ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 568 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side SIERRA PINE AVE Survey Street Name Starting Street Name 2939 BANDINI BLVD End Street Name 2001151554 Run ID Bandini Blvd 68 ID Sidewalk Width Priority feet 2.0-3.0325.2 Cross Slope (PAR)SF29331.6to $120 $3,4561541345ft feet 4.0-5.0334.0 Cross Slope (PAR)SF49344.9to $120 $5,8861541355ft feet -.58354.0 Vertical Change SF5355.0to $75 $3381374395ft feet 3.0-4.0374.5 Cross Slope (PAR)SF45384.5to $120 $5,4001541365ft feet 2.0-3.0385.3 Cross Slope (PAR)SF11387.8to $120 $1,3501541375ft feet 3.0-4.0391.6 Cross Slope (PAR)SF18395.5to $120 $2,1061541385ft feet 2.0-3.0396.4 Cross Slope (PAR)SF32403.6to $120 $3,8881541395ft feet 2.0-3.0414.4 Cross Slope (PAR)SF6415.8to $120 $7561541405ft feet 2.0-3.0418.9 Cross Slope (PAR)SF84437.5to $120 $10,0441541415ft feet 4.0-5.0438.3 Cross Slope (PAR)SF45448.3to $120 $5,4001541425ft feet 2.0-3.0453.6 Cross Slope (PAR)SF5454.6to $120 $5401541435ft feet 3.0-4.0463.7 Cross Slope (PAR)SF16467.3to $120 $1,9441541445ft feet 3.0-4.0469.6 Cross Slope (PAR)SF39478.2to $120 $4,6441541455ft feet 2.0-3.0480.3 Cross Slope (PAR)SF9482.2to $120 $1,0261541465ft feet 2.0-3.0485.8 Cross Slope (PAR)SF9487.8to $120 $1,0801541475ft feet 2.0-3.0490.3 Cross Slope (PAR)SF17494.0to $120 $1,9981541485ft feet 3.0-4.0497.2 Cross Slope (PAR)SF50508.3to $120 $5,9941541495ft feet508.7 Driveway550.8to165722 feet 2.0-3.0550.9 Cross Slope (Driveway)SF66565.5to $40 $2,6281541505ft feet 3.0-4.0568.2 Cross Slope (PAR)SF6569.6to $120 $7561541515ft feet 2.0-3.0571.3 Cross Slope (PAR)SF5572.3to $120 $5401541525ft feet 4.0-5.0577.3 Cross Slope (PAR)SF7578.8to $120 $8101541535ft feet 3.0-4.0581.8 Cross Slope (PAR)SF9583.8to $120 $1,0801541545ft feet 3.0-4.0586.5 Cross Slope (PAR)SF17590.3to $120 $2,0521541555ft feet 2.0-3.0591.8 Cross Slope (PAR)SF17595.5to $120 $1,9981541565ft feet 3.0-4.0598.0 Cross Slope (PAR)SF29604.4to $120 $3,4561541575ft feet 5.0-6.0605.5 Cross Slope (PAR)SF35613.2to $120 $4,1581541585ft feet 3.0-4.0614.0 Cross Slope (PAR)SF18617.9to $120 $2,1061541595ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 569 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side SIERRA PINE AVE Survey Street Name Starting Street Name 2939 BANDINI BLVD End Street Name 2001151554 Run ID Bandini Blvd 68 ID Sidewalk Width Priority feet 2.0-3.0625.1 Cross Slope (PAR)SF20629.6to $120 $2,4301541605ft feet 3.0-4.0632.1 Cross Slope (PAR)SF36640.0to $120 $4,2661541615ft feet 4.0-5.0645.5 Cross Slope (PAR)SF18649.6to $120 $2,2141541625ft feet 2.0-3.0650.8 Cross Slope (PAR)SF7652.3to $120 $8101541635ft feet 5.0-6.0654.8 Cross Slope (PAR)SF23660.0to $120 $2,8081541645ft feet 3.0-4.0660.8 Cross Slope (PAR)SF5662.0to $120 $6481541655ft feet 2.0-3.0662.0 Cross Slope (PAR)SF31668.9to $120 $3,7261541665ft feet 4.0-5.0669.9 Cross Slope (PAR)SF38678.3to $120 $4,5361541675ft feet 2.0-3.0681.9 Cross Slope (PAR)SF10684.2to $120 $1,2421541685ft feet 5.0-6.0688.3 Cross Slope (PAR)SF28694.5to $120 $3,3481541695ft feet 3.0-4.0695.6 Cross Slope (PAR)SF16699.2to $120 $1,9441541705ft feet 2.0-3.0700.2 Cross Slope (PAR)SF7701.8to $120 $8641541715ft feet 2.0-3.0726.0 Cross Slope (PAR)SF121752.8to $120 $14,4721541725ft feet 3.0-4.0755.2 Cross Slope (PAR)SF8756.9to $120 $9181541735ft feet 4.0-5.0761.9 Cross Slope (PAR)SF13764.7to $120 $1,5121541745ft feet 4.0-5.0772.9 Cross Slope (PAR)SF78790.3to $120 $9,3961541755ft feet790.3 Driveway815.8to165723 feet 3.0-4.0816.3 Cross Slope (Driveway)SF5817.3to $40 $1801541765ft feet .31818.2 Vertical Change LF5819.2to $75 $3381374405ft feet 2.0-3.0844.7 Cross Slope (PAR)SF16848.3to $120 $1,9441541775ft feet 2.0-3.0858.3 Cross Slope (PAR)SF11860.8to $120 $1,3501541785ft $180,819.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:SIERRA PINE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 570 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIERRA PINE AVE Survey Street Name Starting Street Name 3308 BANDINI BLVD End Street Name 2001151246 Run ID Bandini Blvd 85.25 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF334.4to $120 $3,9601550868ft feet1.5 Continuous Width REF82.5to167001 8 ft feet 2.0-3.05.3 Cross Slope (PAR)SF16727.6to $120 $20,0701550878ft feet 1.3211.0 Vertical Change REF812.0to137614 8 ft feet 2.0-3.033.3 Cross Slope (PAR)SF6842.3to $120 $8,1001550888ft feet 5.0-6.045.8 Running Slope SF947.0to $120 $1,0801665288ft feet48.3 Driveway92.6to165792 feet -.3480.2 Vertical Change REF881.2to137615 8 ft feet 3.0-4.092.6 Cross Slope (Driveway)SF3997.8to $40 $1,5601550898ft feet 2.0-3.097.8 Cross Slope (PAR)SF999.0to $120 $1,0801550908ft feet 2.0-3.0106.8 Cross Slope (PAR)SF8107.8to $120 $9001550918ft feet 4.0-5.0110.2 Cross Slope (PAR)SF56117.6to $120 $6,6601550928ft feet .74119.7 Vertical Change SF8120.7to $75 $5631376168ft feet 3.0-4.0123.4 Cross Slope (PAR)SF21126.2to $120 $2,5201550938ft feet 2.0-3.0126.2 Cross Slope (PAR)SF42131.8to $120 $5,0401550948ft feet 2.0-3.0138.6 Cross Slope (PAR)SF35143.3to $120 $4,2301550958ft feet -1.41142.0 Vertical Change REF8143.0to137617 8 ft feet143.6 Driveway165.0to165793 feet 2.0-3.0173.7 Cross Slope (PAR)SF105187.7to $120 $12,6001550968ft feet 2.0-3.0189.9 Cross Slope (PAR)SF67198.8to $120 $8,0101550978ft feet201.3 Driveway238.2to165794 feet 2.0-3.0242.6 Cross Slope (PAR)SF17244.9to $120 $2,0701550988ft feet245.7 Driveway270.7to165795 feet 3.0-4.0271.0 Cross Slope (Driveway)SF8272.0to $40 $3001550998ft feet 2.0-3.0273.1 Cross Slope (PAR)SF95285.8to $120 $11,4301551008ft feet 2.0-3.0289.3 Cross Slope (PAR)SF32293.5to $120 $3,7801551018ft feet 2.0-3.0300.8 Cross Slope (PAR)SF19303.3to $120 $2,2501551028ft feet -.38305.8 Vertical Change LF8306.8to $75 $5631376188ft feet 5.0-6.0316.9 Running Slope SF18319.3to $120 $2,1601665298ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 571 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIERRA PINE AVE Survey Street Name Starting Street Name 3308 BANDINI BLVD End Street Name 2001151246 Run ID Bandini Blvd 85.25 ID Sidewalk Width Priority feet319.6 Driveway361.8to165796 feet 3.0-4.0362.1 Cross Slope (Driveway)SF58369.8to $40 $2,3101551038ft feet369.8 Driveway398.8to165797 feet 5.0-6.0405.3 Cross Slope (PAR)SF30409.3to $120 $3,6001551048ft feet 6.0-7.0409.3 Cross Slope (PAR)SF22412.2to $120 $2,6101551058ft feet 5.0-6.0412.2 Cross Slope (PAR)SF37417.1to $120 $4,4101551068ft feet 4.0-5.0424.7 Cross Slope (PAR)SF44430.6to $120 $5,3101551078ft feet 3.0-4.0442.9 Cross Slope (PAR)SF13444.6to $120 $1,5301551088ft feet 2.0-3.0444.6 Cross Slope (PAR)SF9445.8to $120 $1,0801551098ft feet 2.0-3.0448.3 Cross Slope (PAR)SF11449.7to $120 $1,2601551108ft feet 2.0-3.0454.3 Cross Slope (PAR)SF20457.0to $120 $2,4301551118ft feet457.0 Driveway487.7to165798 feet 2.0-3.0489.1 Cross Slope (PAR)SF17491.3to $120 $1,9801551128ft feet 2.0-3.0495.2 Cross Slope (PAR)SF53502.3to $120 $6,3901551138ft feet 4.0-5.0505.0 Cross Slope (PAR)SF72514.6to $120 $8,6401551148ft feet 2.0-3.0515.3 Cross Slope (PAR)SF143534.3to $120 $17,1001551158ft feet 3.0-4.0537.5 Cross Slope (PAR)SF97550.4to $120 $11,6101551168ft feet 3.0-4.0552.7 Cross Slope (PAR)SF8553.8to $120 $9901551178ft feet 2.0-3.0553.8 Cross Slope (PAR)SF69563.0to $120 $8,2801551188ft feet 2.0-3.0567.9 Cross Slope (PAR)SF19570.4to $120 $2,2501551198ft feet 2.0-3.0573.5 Cross Slope (PAR)SF8574.6to $120 $9901551208ft feet575.3 Driveway600.8to165799 feet 3.0-4.0615.7 Cross Slope (PAR)SF8616.8to $120 $9901551218ft feet 2.0-3.0617.2 Cross Slope (PAR)SF70626.6to $120 $8,4601551228ft feet 4.0-5.0627.8 Cross Slope (PAR)SF53634.9to $120 $6,3901551238ft feet 2.0-3.0636.8 Cross Slope (PAR)SF208664.5to $120 $24,9301551248ft feet 4.0-5.0664.5 Cross Slope (PAR)SF46670.6to $120 $5,4901551258ft feet .38671.7 Vertical Change LF8672.7to $75 $5631376198ft feet 3.0-4.0673.4 Cross Slope (PAR)SF22676.3to $120 $2,6101551268ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 572 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side SIERRA PINE AVE Survey Street Name Starting Street Name 3308 BANDINI BLVD End Street Name 2001151246 Run ID Bandini Blvd 85.25 ID Sidewalk Width Priority feet 2.0-3.0676.3 Cross Slope (PAR)SF163698.0to $120 $19,5301551278ft feet .33689.2 Vertical Change REF8690.2to137620 8 ft feet 2.0-3.0700.9 Cross Slope (PAR)SF41706.3to $120 $4,8601551288ft feet 2.0-3.0708.6 Cross Slope (PAR)SF12710.2to $120 $1,4401551298ft feet 2.0-3.0718.0 Cross Slope (PAR)SF69727.2to $120 $8,2801551308ft feet 4.0-5.0727.7 Cross Slope (PAR)SF38732.8to $120 $4,5901551318ft feet 2.0-3.0734.7 Cross Slope (PAR)SF32739.0to $120 $3,8701551328ft feet -.43741.2 Vertical Change LF8742.2to $75 $5631376218ft feet 4.0-5.0742.8 Cross Slope (PAR)SF18745.2to $120 $2,1601551338ft feet 5.0-6.0748.5 Running Slope SF25751.8to $120 $2,9701665308ft feet751.8 Driveway787.0to165800 feet 2.0-3.0787.2 Cross Slope (Driveway)SF23790.3to $40 $9301551348ft feet 4.0-5.0799.3 Cross Slope (PAR)SF9800.5to $120 $1,0801551358ft feet .58800.6 Vertical Change SF8801.6to $75 $5631376228ft feet 2.0-3.0802.4 Cross Slope (PAR)SF8803.4to $120 $9001551368ft feet809.8 Driveway852.3to165801 feet -.37824.4 Vertical Change REF8825.4to137623 8 ft feet .31828.8 Vertical Change REF8829.8to137624 8 ft feet -.31835.2 Vertical Change REF8836.2to137625 8 ft feet 2.74837.4 Vertical Change REF8838.4to137626 8 ft feet 3.0-4.0853.7 Cross Slope (PAR)SF8854.8to $120 $9901551378ft $283,852.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:SIERRA PINE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 573 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161330 Run ID Bandini Blvd 89.25 ID Sidewalk Width Priority feet 3.0-4.00.6 Cross Slope (PAR)SF354.3to $120 $4,21815654910ft feet 5.0-6.04.3 Cross Slope (PAR)SF135.7to $120 $1,59615655010ft feet 6.0-7.05.7 Cross Slope (PAR)SF7713.8to $120 $9,23415655110ft feet 8.0-9.016.0 Cross Slope (PAR)SF5321.6to $120 $6,38415655210ft feet 3.0-4.028.9 Cross Slope (PAR)SF1330.3to $120 $1,59615655310ft feet 2.0-3.030.3 Cross Slope (PAR)SF2032.4to $120 $2,39415655410ft feet 3.0-4.036.8 Cross Slope (PAR)SF2839.7to $120 $3,30615655510ft feet 2.0-3.039.7 Cross Slope (PAR)SF8849.0to $120 $10,60215655610ft feet 2.0-3.051.3 Cross Slope (PAR)SF10462.2to $120 $12,42615655710ft feet 2.0-3.071.8 Cross Slope (PAR)SF2974.8to $120 $3,42015655810ft feet 2.0-3.080.8 Cross Slope (PAR)SF198101.6to $120 $23,71215655910ft feet 3.0-4.0104.4 Cross Slope (PAR)SF13105.8to $120 $1,59615656010ft feet 2.0-3.0106.1 Cross Slope (PAR)SF20108.2to $120 $2,39415656110ft feet 2.0-3.0115.3 Cross Slope (PAR)SF32118.7to $120 $3,87615656210ft feet 3.0-4.0124.1 Cross Slope (PAR)SF40128.3to $120 $4,78815656310ft feet 2.0-3.0128.7 Cross Slope (PAR)SF28131.6to $120 $3,30615656410ft feet 2.0-3.0134.8 Cross Slope (PAR)SF23137.2to $120 $2,73615656510ft feet 3.0-4.0143.5 Cross Slope (PAR)SF12144.8to $120 $1,48215656610ft feet 3.0-4.0148.5 Cross Slope (PAR)SF29151.6to $120 $3,53415656710ft feet 2.0-3.0152.2 Cross Slope (PAR)SF22154.5to $120 $2,62215656810ft feet160.7 Driveway188.4to165879 feet 2.0-3.0188.4 Cross Slope (Driveway)SF54194.1to $40 $2,16615656910ft feet 4.0-5.0194.1 Cross Slope (PAR)SF40198.3to $120 $4,78815657010ft feet .33198.4 Vertical Change LF10199.4to $75 $71313787910ft feet 2.0-3.0205.3 Cross Slope (PAR)SF46210.1to $120 $5,47215657110ft feet -.35207.1 Vertical Change REF10208.1to137880 10 ft feet 3.0-4.0215.3 Cross Slope (PAR)SF13216.7to $120 $1,59615657210ft feet 2.0-3.0216.7 Cross Slope (PAR)SF30219.9to $120 $3,64815657310ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 574 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161330 Run ID Bandini Blvd 89.25 ID Sidewalk Width Priority feet 3.0-4.0222.0 Cross Slope (PAR)SF104232.9to $120 $12,42615657410ft feet 2.0-3.0234.6 Cross Slope (PAR)SF22236.9to $120 $2,62215657510ft feet 3.0-4.0239.3 Cross Slope (PAR)SF24241.8to $120 $2,85015657610ft feet 2.0-3.0242.8 Cross Slope (PAR)SF228266.8to $120 $27,36015657710ft feet 4.0-5.0266.8 Cross Slope (PAR)SF62273.3to $120 $7,41015657810ft feet 4.0-5.0275.6 Cross Slope (PAR)SF116287.8to $120 $13,90815657910ft feet288.6 Driveway349.4to165880 feet 2.0-3.0350.1 Cross Slope (PAR)SF20352.2to $120 $2,39415658010ft feet .26353.9 Vertical Change LF10354.9to $75 $71313788110ft feet 3.0-4.0356.3 Cross Slope (PAR)SF10357.3to $120 $1,14015658110ft feet 2.0-3.0361.5 Cross Slope (PAR)SF48366.6to $120 $5,81415658210ft feet 5.0-6.0367.5 Cross Slope (PAR)SF10368.5to $120 $1,14015658310ft feet .64370.9 Vertical Change SF10371.9to $75 $71313788210ft feet 2.0-3.0378.1 Cross Slope (PAR)SF136392.4to $120 $16,30215658410ft feet .76383.9 Vertical Change REF10384.9to137883 10 ft feet 2.31388.8 Vertical Change REF10389.8to137884 10 ft feet 4.0-5.0393.7 Cross Slope (PAR)SF10394.8to $120 $1,25415658510ft feet 3.0-4.0397.6 Cross Slope (PAR)SF76405.6to $120 $9,12015658610ft feet 2.0-3.0407.3 Cross Slope (PAR)SF19409.3to $120 $2,28015658710ft feet 2.0-3.0414.1 Cross Slope (PAR)SF29417.2to $120 $3,53415658810ft feet 1.88415.4 Vertical Change REF10416.4to137885 10 ft feet 4.0-5.0422.8 Cross Slope (PAR)SF10423.8to $120 $1,14015658910ft feet 2.0-3.0429.2 Cross Slope (PAR)SF10430.2to $120 $1,14015659010ft feet -.28439.4 Vertical Change LF10440.4to $75 $71313788610ft feet 2.0-3.0443.0 Cross Slope (PAR)SF14444.5to $120 $1,71015659110ft feet 2.0-3.0448.8 Cross Slope (PAR)SF126462.1to $120 $15,16215659210ft feet 3.0-4.0464.4 Cross Slope (PAR)SF47469.3to $120 $5,58615659310ft feet 3.0-4.0471.4 Cross Slope (PAR)SF36475.2to $120 $4,33215659410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 575 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161330 Run ID Bandini Blvd 89.25 ID Sidewalk Width Priority feet 4.0-5.0479.0 Cross Slope (PAR)SF19481.0to $120 $2,28015659510ft feet 2.0-3.0481.9 Cross Slope (PAR)SF57487.9to $120 $6,84015659610ft feet .77489.6 Vertical Change SF10490.6to $75 $71313788710ft feet 2.0-3.0492.0 Cross Slope (PAR)SF41496.3to $120 $4,90215659710ft feet 5.0-6.0496.3 Running Slope REF13497.7to166560 10 ft feet498.2 Driveway523.4to165881 feet 3.0-4.0523.4 Cross Slope (Driveway)SF83532.1to $40 $3,30615659810ft feet .34531.9 Vertical Change REF32535.3to137890 10 ft feet 8.0-9.0533.6 Cross Slope (PAR)SF10534.7to $120 $1,25415659910ft feet 2.0-3.0538.8 Cross Slope (PAR)SF30542.0to $120 $3,64815660010ft feet 2.0-3.0548.5 Cross Slope (PAR)SF10549.6to $120 $1,25415660110ft feet .46560.2 Vertical Change LF10561.2to $75 $71313789110ft feet569.3 Cold Patch 31572.6to140545 10 ft feet .26570.2 Vertical Change LF10571.2to $75 $71313789210ft feet 3.0-4.0572.6 Cross Slope (PAR)SF11573.8to $120 $1,36815660210ft feet 2.0-3.0575.5 Cross Slope (PAR)SF17577.3to $120 $2,05215660310ft feet 2.0-3.0579.5 Cross Slope (PAR)SF65586.3to $120 $7,75215660410ft feet587.0 Driveway614.4to165882 feet -.27593.0 Vertical Change REF10594.0to137893 10 ft feet615.3 Continuous Width SF10616.3to $120 $1,14016690310ft feet 2.0-3.0617.1 Cross Slope (PAR)SF67624.1to $120 $7,98015660510ft feet 4.0-5.0624.8 Cross Slope (PAR)SF22627.1to $120 $2,62215660610ft feet 8.0-9.0629.5 Cross Slope (PAR)SF17631.3to $120 $2,05215660710ft feet 4.0-5.0634.0 Cross Slope (PAR)SF10635.0to $120 $1,14015660810ft feet638.8 Driveway661.3to165883 feet 8.0-9.0661.3 Cross Slope (Driveway)SF38665.3to $40 $1,52015660910ft feet 3.0-4.0666.9 Cross Slope (PAR)SF19668.9to $120 $2,28015661010ft feet 2.0-3.0669.1 Cross Slope (PAR)SF30672.3to $120 $3,64815661110ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 576 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161330 Run ID Bandini Blvd 89.25 ID Sidewalk Width Priority feet 4.0-5.0675.6 Cross Slope (PAR)SF54681.3to $120 $6,49815661210ft feet681.5 Continuous Width SF10682.5to $120 $1,14016690410ft feet 6.0-7.0682.6 Cross Slope (PAR)SF21684.8to $120 $2,50815661310ft feet 2.0-3.0687.0 Cross Slope (PAR)SF47691.9to $120 $5,58615661410ft feet 2.0-3.0696.6 Cross Slope (PAR)SF54702.3to $120 $6,49815661510ft feet 3.0-4.0705.2 Cross Slope (PAR)SF16706.9to $120 $1,93815661610ft feet 2.0-3.0706.9 Cross Slope (PAR)SF79715.2to $120 $9,46215661710ft feet 3.0-4.0718.1 Cross Slope (PAR)SF21720.3to $120 $2,50815661810ft feet 3.0-4.0726.0 Cross Slope (PAR)SF36729.8to $120 $4,33215661910ft feet730.5 Driveway771.1to165884 feet 2.0-3.0773.8 Cross Slope (PAR)SF29776.8to $120 $3,42015662010ft feet 4.0-5.0777.7 Cross Slope (PAR)SF29780.8to $120 $3,53415662110ft feet 2.0-3.0782.9 Cross Slope (PAR)SF18784.8to $120 $2,16615662210ft feet 2.0-3.0786.9 Cross Slope (PAR)SF10788.0to $120 $1,25415662310ft feet 2.0-3.0792.8 Cross Slope (PAR)SF41797.1to $120 $4,90215662410ft feet 4.0-5.0798.3 Cross Slope (PAR)SF24800.8to $120 $2,85015662510ft feet .35802.9 Vertical Change LF10803.9to $75 $71313789410ft feet 2.0-3.0804.0 Cross Slope (PAR)SF18805.9to $120 $2,16615662610ft feet -.45808.8 Vertical Change LF10809.8to $75 $71313789510ft feet -.3815.4 Vertical Change LF10816.4to $75 $71313789710ft feet .28819.7 Vertical Change REF10820.7to137898 10 ft feet 2.0-3.0820.7 Cross Slope (PAR)SF13822.1to $120 $1,59615662710ft feet 2.0-3.0824.9 Cross Slope (PAR)SF87834.1to $120 $10,48815662810ft feet -.28828.6 Vertical Change REF10829.6to137899 10 ft feet 3.0-4.0838.8 Cross Slope (PAR)SF29841.9to $120 $3,53415662910ft feet842.9 Driveway869.7to165885 feet 3.0-4.0870.4 Cross Slope (Driveway)SF36874.2to $40 $1,44415663010ft feet 2.0-3.0874.2 Cross Slope (PAR)SF115886.3to $120 $13,79415663110ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 577 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161330 Run ID Bandini Blvd 89.25 ID Sidewalk Width Priority feet 4.0-5.0886.3 Cross Slope (PAR)SF28889.2to $120 $3,30615663210ft feet 3.0-4.0892.2 Cross Slope (PAR)SF17894.0to $120 $2,05215663310ft feet 2.0-3.0894.3 Cross Slope (PAR)SF45899.0to $120 $5,35815663410ft feet .48897.7 Vertical Change REF10898.7to137900 10 ft feet 4.0-5.0899.9 Cross Slope (PAR)SF71907.4to $120 $8,55015663510ft feet907.6 Driveway931.0to165886 feet 3.0-4.0931.5 Cross Slope (PAR)SF74939.3to $120 $8,89215663610ft feet 3.52937.2 Vertical Change REF10938.2to137901 10 ft feet 3.0-4.0942.9 Cross Slope (PAR)SF121955.6to $120 $14,47815663710ft feet .27952.4 Vertical Change REF10953.4to137902 10 ft feet 2.0-3.0955.9 Cross Slope (PAR)SF89965.3to $120 $10,71615663810ft feet 3.49965.4 Vertical Change REF10966.4to137903 10 ft feet 4.0-5.0965.5 Cross Slope (PAR)SF40969.7to $120 $4,78815663910ft feet970.5 Driveway996.1to165887 feet 1.07994.8 Vertical Change REF10995.8to137904 10 ft feet 3.0-4.0998.2 Cross Slope (PAR)SF301001.4to $120 $3,64815664010ft feet 6.0-7.01003.7 Cross Slope (PAR)SF271006.5to $120 $3,19215664110ft feet 5.0-6.01006.5 Cross Slope (PAR)SF441011.1to $120 $5,24415664210ft feet 3.0-4.01013.9 Cross Slope (PAR)SF2881044.2to $120 $34,54215664310ft feet .531035.2 Vertical Change REF101036.2to137905 10 ft feet 5.0-6.01044.2 Cross Slope (PAR)SF401048.4to $120 $4,78815664410ft feet .441047.2 Vertical Change REF101048.2to137906 10 ft feet 6.0-7.01051.1 Cross Slope (PAR)SF291054.1to $120 $3,42015664510ft feet -.331051.7 Vertical Change REF101052.7to137907 10 ft feet 9.0-10.01055.4 Cross Slope (PAR)SF101056.4to $120 $1,14015664610ft feet 4.0-5.01063.6 Cross Slope (PAR)SF471068.5to $120 $5,58615664710ft feet1068.8 Driveway1086.5to165888 feet 5.0-6.01086.5 Cross Slope (Driveway)SF2781115.8to $40 $11,13415664810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 578 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161330 Run ID Bandini Blvd 89.25 ID Sidewalk Width Priority feet -.561104.0 Vertical Change REF101105.0to137908 10 ft feet 3.0-4.01120.0 Cross Slope (PAR)SF341123.6to $120 $4,10415664910ft feet 4.0-5.01125.7 Cross Slope (PAR)SF361129.5to $120 $4,33215665010ft feet .361130.0 Vertical Change LF101131.0to $75 $71313790910ft feet 2.0-3.01131.7 Cross Slope (PAR)SF481136.7to $120 $5,70015665110ft feet 4.0-5.01136.7 Cross Slope (PAR)SF691144.0to $120 $8,32215665210ft feet 3.0-4.01148.1 Cross Slope (PAR)SF721155.7to $120 $8,66415665310ft feet 2.0-3.01158.7 Cross Slope (PAR)SF101159.8to $120 $1,25415665410ft feet 2.0-3.01164.3 Cross Slope (PAR)SF1401179.0to $120 $16,75815665510ft feet 3.221167.5 Vertical Change REF101168.5to137910 10 ft feet 3.481181.3 Vertical Change SF101182.3to $75 $71313791110ft feet 2.0-3.01183.5 Cross Slope (PAR)SF541189.2to $120 $6,49815665610ft feet 3.0-4.01191.5 Cross Slope (PAR)SF121192.8to $120 $1,48215665710ft feet 2.0-3.01192.8 Cross Slope (PAR)SF131194.2to $120 $1,59615665810ft $608,266.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 579 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name S DOWNEY RD End Street Name 2001161618 Run ID Bandini Blvd 42 ID Sidewalk Width Priority feet 2.0-3.00.9 Cross Slope (PAR)SF101.9to $120 $1,14015600910ft feet 2.0-3.04.2 Cross Slope (PAR)SF206.3to $120 $2,39415601010ft $3,534.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 580 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name BONNIE BEACH PL End Street Name 2001171110 Run ID Bandini Blvd 66.25 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF828.6to $120 $9,80415835910ft feet 6.0-7.09.4 Cross Slope (PAR)SF3212.8to $120 $3,87615836010ft feet 5.0-6.013.0 Cross Slope (PAR)SF3716.9to $120 $4,44615836110ft feet 3.0-4.017.8 Cross Slope (PAR)SF1419.3to $120 $1,71015836210ft feet 2.0-3.024.9 Cross Slope (PAR)SF24650.8to $120 $29,52615836310ft feet 3.0-4.056.9 Cross Slope (PAR)SF1858.8to $120 $2,16615836410ft feet 2.0-3.060.3 Cross Slope (PAR)SF1061.4to $120 $1,25415836510ft feet 2.0-3.069.0 Cross Slope (PAR)SF1971.0to $120 $2,28015836610ft feet72.2 Driveway105.1to165971 feet 4.0-5.0111.1 Cross Slope (PAR)SF10112.2to $120 $1,25415836710ft feet 2.0-3.0113.1 Cross Slope (PAR)SF54118.8to $120 $6,49815836810ft feet .65113.7 Vertical Change REF10114.7to138205 10 ft feet 4.0-5.0119.8 Cross Slope (PAR)SF12121.1to $120 $1,48215836910ft feet 2.0-3.0127.4 Cross Slope (PAR)SF183146.7to $120 $22,00215837010ft feet 2.0-3.0150.6 Cross Slope (PAR)SF24153.1to $120 $2,85015837110ft feet 3.0-4.0155.6 Cross Slope (PAR)SF10156.7to $120 $1,25415837210ft feet 2.0-3.0157.0 Cross Slope (PAR)SF122169.8to $120 $14,59215837310ft feet 2.0-3.0172.6 Cross Slope (PAR)SF11173.8to $120 $1,36815837410ft feet 2.0-3.0180.6 Cross Slope (PAR)SF107191.9to $120 $12,88215837510ft feet 2.0-3.0196.3 Cross Slope (PAR)SF11197.5to $120 $1,36815837610ft feet 2.0-3.0203.1 Cross Slope (PAR)SF80211.5to $120 $9,57615837710ft feet 1.14220.5 Vertical Change SF10221.5to $75 $71313820610ft feet .39222.6 Vertical Change LF10223.6to $75 $71313820710ft feet 2.0-3.0229.4 Cross Slope (PAR)SF44234.0to $120 $5,24415837810ft feet 2.0-3.0242.3 Cross Slope (PAR)SF159259.0to $120 $19,03815837910ft feet 2.0-3.0271.8 Cross Slope (PAR)SF74279.6to $120 $8,89215838010ft feet 3.0-4.0282.8 Cross Slope (PAR)SF23285.2to $120 $2,73615838110ft feet 3.55294.2 Vertical Change SF10295.2to $75 $71313820810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 581 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name BONNIE BEACH PL End Street Name 2001171110 Run ID Bandini Blvd 66.25 ID Sidewalk Width Priority feet 2.0-3.0301.8 Cross Slope (PAR)SF251328.2to $120 $30,09615838210ft feet .65319.0 Vertical Change REF10320.0to138209 10 ft feet 2.0-3.0331.6 Cross Slope (PAR)SF10332.6to $120 $1,14015838310ft feet 2.0-3.0341.4 Cross Slope (PAR)SF13342.8to $120 $1,59615838410ft feet 4.0-5.0345.4 Cross Slope (PAR)SF53351.0to $120 $6,38415838510ft feet 5.0-6.0349.1 Running Slope REF16350.8to166626 10 ft feet 2.0-3.0353.0 Cross Slope (PAR)SF147368.5to $120 $17,67015838610ft feet 3.0-4.0375.6 Cross Slope (PAR)SF16377.3to $120 $1,93815838710ft feet 2.0-3.0383.4 Cross Slope (PAR)SF40387.6to $120 $4,78815838810ft feet .44396.1 Vertical Change LF10397.1to $75 $71313821010ft feet 4.0-5.0402.9 Cross Slope (PAR)SF36406.7to $120 $4,33215838910ft feet 4.0-5.0408.8 Cross Slope (PAR)SF10409.8to $120 $1,14015839010ft feet 2.0-3.0414.4 Cross Slope (PAR)SF16416.1to $120 $1,93815839110ft feet 2.0-3.0423.8 Cross Slope (PAR)SF29426.8to $120 $3,42015839210ft feet 2.0-3.0432.3 Cross Slope (PAR)SF112444.1to $120 $13,45215839310ft feet 4.0-5.0451.1 Cross Slope (PAR)SF108462.5to $120 $12,99615839410ft feet 1.03452.0 Vertical Change REF10453.0to138211 10 ft feet 2.0-3.0463.3 Cross Slope (PAR)SF10464.4to $120 $1,25415839510ft feet 4.0-5.0468.3 Cross Slope (PAR)SF74476.1to $120 $8,89215839610ft feet 3.0-4.0478.3 Cross Slope (PAR)SF19480.3to $120 $2,28015839710ft feet 2.0-3.0481.5 Cross Slope (PAR)SF67488.5to $120 $7,98015839810ft feet 2.0-3.0491.2 Cross Slope (PAR)SF11492.4to $120 $1,36815839910ft feet 3.0-4.0509.0 Cross Slope (PAR)SF24511.5to $120 $2,85015840010ft feet 2.0-3.0514.3 Cross Slope (PAR)SF98524.6to $120 $11,74215840110ft feet 4.0-5.0524.9 Cross Slope (PAR)SF38528.9to $120 $4,56015840210ft feet 2.0-3.0529.1 Cross Slope (PAR)SF10530.1to $120 $1,14015840310ft feet 3.0-4.0535.7 Cross Slope (PAR)SF10536.8to $120 $1,25415840410ft feet 2.0-3.0537.8 Cross Slope (PAR)SF87547.0to $120 $10,48815840510ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 582 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name BONNIE BEACH PL End Street Name 2001171110 Run ID Bandini Blvd 66.25 ID Sidewalk Width Priority feet 4.0-5.0547.0 Cross Slope (PAR)SF74554.8to $120 $8,89215840610ft feet 2.0-3.0555.1 Cross Slope (PAR)SF46559.9to $120 $5,47215840710ft feet 2.0-3.0565.4 Cross Slope (PAR)SF12566.7to $120 $1,48215840810ft feet 4.0-5.0572.8 Cross Slope (PAR)SF71580.3to $120 $8,55015840910ft feet580.3 Driveway628.4to165972 feet .44590.4 Vertical Change REF10591.4to138212 10 ft feet -.31604.0 Vertical Change REF10605.0to138213 10 ft feet 3.0-4.0631.0 Cross Slope (PAR)SF55636.8to $120 $6,61215841010ft feet 2.0-3.0636.8 Cross Slope (PAR)SF14638.3to $120 $1,71015841110ft feet 3.0-4.0640.6 Cross Slope (PAR)SF57646.6to $120 $6,84015841210ft feet 2.0-3.0648.5 Cross Slope (PAR)SF39652.6to $120 $4,67415841310ft feet657.1 Cold Patch 29660.1to140560 10 ft feet .47661.1 Vertical Change LF10662.1to $75 $71313821410ft feet 2.0-3.0667.0 Cross Slope (PAR)SF58673.1to $120 $6,95415841410ft feet 2.0-3.0689.6 Cross Slope (PAR)SF125702.8to $120 $15,04815841510ft feet 3.0-4.0708.8 Cross Slope (PAR)SF11710.0to $120 $1,36815841610ft feet 2.0-3.0710.0 Cross Slope (PAR)SF13711.4to $120 $1,59615841710ft feet 2.0-3.0713.9 Cross Slope (PAR)SF23716.3to $120 $2,73615841810ft feet 5.0-6.0728.9 Cross Slope (PAR)SF10730.0to $120 $1,25415841910ft feet 3.0-4.0733.3 Cross Slope (PAR)SF19735.3to $120 $2,28015842010ft feet 2.0-3.0736.6 Cross Slope (PAR)SF74744.4to $120 $8,89215842110ft feet 3.0-4.0749.0 Cross Slope (PAR)SF16750.7to $120 $1,93815842210ft feet 2.0-3.0751.2 Cross Slope (PAR)SF59757.4to $120 $7,06815842310ft feet .3758.3 Vertical Change LF10759.3to $75 $71313821510ft feet 2.0-3.0759.6 Cross Slope (PAR)SF29762.6to $120 $3,42015842410ft feet 3.3765.0 Vertical Change SF10766.0to $75 $71313821610ft feet 2.0-3.0767.3 Cross Slope (PAR)SF57773.3to $120 $6,84015842510ft feet 3.0-4.0780.8 Cross Slope (PAR)SF32784.2to $120 $3,87615842610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 583 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S BANDINI BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name BONNIE BEACH PL End Street Name 2001171110 Run ID Bandini Blvd 66.25 ID Sidewalk Width Priority feet 2.0-3.0785.0 Cross Slope (PAR)SF17786.8to $120 $2,05215842710ft feet 4.0-5.0796.8 Cross Slope (PAR)SF71804.3to $120 $8,55015842810ft feet 2.0-3.0804.5 Cross Slope (PAR)SF45809.2to $120 $5,35815842910ft feet 3.0-4.0816.9 Cross Slope (PAR)SF18818.8to $120 $2,16615843010ft feet 2.0-3.0819.3 Cross Slope (PAR)SF145834.6to $120 $17,44215843110ft feet 5.0-6.0837.2 Cross Slope (PAR)SF12838.5to $120 $1,48215843210ft feet 3.0-4.0840.2 Cross Slope (PAR)SF82848.8to $120 $9,80415843310ft feet 5.0-6.0849.0 Cross Slope (PAR)SF46853.8to $120 $5,47215843410ft feet 4.0-5.0857.7 Cross Slope (PAR)SF12859.0to $120 $1,48215843510ft feet 3.0-4.0861.3 Cross Slope (PAR)SF22863.6to $120 $2,62215843610ft feet 2.0-3.0868.9 Cross Slope (PAR)SF43873.4to $120 $5,13015843710ft feet 2.0-3.0877.3 Cross Slope (PAR)SF44881.9to $120 $5,24415843810ft feet882.9 Driveway924.8to165973 feet 2.99918.8 Vertical Change REF10919.8to138217 10 ft feet 4.0-5.0924.8 Cross Slope (Driveway)SF41929.1to $40 $1,63415843910ft feet 2.0-3.0929.4 Cross Slope (PAR)SF13930.8to $120 $1,59615844010ft feet 3.0-4.0933.1 Cross Slope (PAR)SF11934.3to $120 $1,36815844110ft feet936.7 Driveway975.1to165974 feet936.7 Driveway977.8to165975 feet 2.0-3.0975.8 Cross Slope (Driveway)SF19977.8to $40 $76015844210ft feet -.3976.0 Vertical Change REF10977.0to138218 10 ft $505,447.50TOTAL COST FOR:BANDINI BLVDSside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 584 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N BANDINI BLVD Street Side TRAIN CROSSING BEFORE S DOWNEY RD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001161617 Run ID Bandini Blvd 53.25 ID Sidewalk Width Priority feet 3.0-4.00.2 Cross Slope (PAR)SF485.3to $120 $5,81415601110ft feet 5.0-6.01.4 Running Slope REF173.2to166550 10 ft feet 2.0-3.06.3 Cross Slope (PAR)SF299.4to $120 $3,53415601210ft feet 2.0-3.012.9 Cross Slope (PAR)SF9422.8to $120 $11,28615601310ft $20,634.00TOTAL COST FOR:BANDINI BLVDNside of Starting at:TRAIN CROSSING BEFORE S DOWNEY RD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 585 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E BICKETT ST Street Side CITY BOUNDARY Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912131019 Run ID Bickett St 54 ID Sidewalk Width Priority feet .490.5 Vertical Change REF81.5to135646 8 ft feet 3.0-4.01.4 Cross Slope (PAR)SF467.5to $120 $5,4901471408ft feet 2.0-3.07.5 Cross Slope (PAR)SF2911.4to $120 $3,5101471418ft feet 4.0-5.011.4 Cross Slope (PAR)SF6820.5to $120 $8,1901471428ft feet -.2712.1 Vertical Change REF813.1to135648 8 ft feet 1.0116.0 Vertical Change REF817.0to135649 8 ft feet 2.0-3.020.7 Cross Slope (PAR)SF10034.0to $120 $11,9701471438ft feet 2.0-3.040.0 Cross Slope (PAR)SF6348.4to $120 $7,5601471448ft feet -.2746.6 Vertical Change REF847.6to135650 8 ft feet 3.0-4.050.8 Cross Slope (PAR)SF1652.9to $120 $1,8901471458ft feet 2.0-3.054.0 Cross Slope (PAR)SF13471.8to $120 $16,0201471468ft feet 1.0255.4 Vertical Change REF856.4to135651 8 ft feet .3166.1 Vertical Change REF867.1to135652 8 ft feet .5570.8 Vertical Change REF871.8to135653 8 ft feet 4.0-5.071.8 Cross Slope (PAR)SF4577.8to $120 $5,4001471478ft feet .2975.2 Vertical Change REF876.2to135654 8 ft feet 2.0-3.077.8 Cross Slope (PAR)SF2781.4to $120 $3,2401471488ft feet .6477.9 Vertical Change REF4283.5to135655 8 ft feet 4.0-5.081.9 Cross Slope (PAR)SF10295.5to $120 $12,2401471498ft feet 1.0984.2 Vertical Change SF885.2to $75 $5631356568ft feet .6486.7 Vertical Change REF887.7to135657 8 ft feet -.6389.8 Vertical Change REF2092.5to135658 8 ft feet .5694.7 Vertical Change REF2397.8to135659 8 ft feet 2.0-3.095.5 Cross Slope (PAR)SF195121.5to $120 $23,4001471508ft feet 1.31113.8 Vertical Change REF8114.8to135660 8 ft feet .6118.3 Vertical Change REF8119.3to135661 8 ft feet 4.0-5.0122.1 Cross Slope (PAR)SF11123.6to $120 $1,3501471518ft feet 3.0-4.0127.2 Cross Slope (PAR)SF15129.2to $120 $1,8001471528ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 586 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E BICKETT ST Street Side CITY BOUNDARY Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912131019 Run ID Bickett St 54 ID Sidewalk Width Priority feet 2.0-3.0129.8 Cross Slope (PAR)SF106144.0to $120 $12,7801471538ft feet 4.0-5.0144.6 Cross Slope (PAR)SF23147.7to $120 $2,7901471548ft feet 2.0-3.0148.2 Cross Slope (PAR)SF116163.7to $120 $13,9501471558ft feet165.8 Driveway207.1to165080 feet 4.0-5.0208.6 Cross Slope (PAR)SF43214.3to $120 $5,1301471568ft feet214.3 Driveway258.5to165081 feet 2.0-3.0259.3 Cross Slope (PAR)SF60267.3to $120 $7,2001471578ft feet 4.0-5.0267.8 Cross Slope (PAR)SF60275.8to $120 $7,2001471588ft feet 3.0-4.0277.9 Cross Slope (PAR)SF35282.5to $120 $4,1401471598ft feet 2.0-3.0283.3 Cross Slope (PAR)SF77293.6to $120 $9,2701471608ft feet 3.0-4.0296.5 Cross Slope (PAR)SF9297.7to $120 $1,0801471618ft feet 2.0-3.0297.9 Cross Slope (PAR)SF39303.1to $120 $4,6801471628ft feet 2.68299.4 Vertical Change REF8300.4to135662 8 ft feet 4.0-5.0303.6 Cross Slope (PAR)SF31307.7to $120 $3,6901471638ft feet 2.0-3.0308.1 Cross Slope (PAR)SF39313.3to $120 $4,6801471648ft feet 2.0-3.0317.7 Cross Slope (PAR)SF64326.2to $120 $7,6501471658ft feet 3.0-4.0329.3 Cross Slope (PAR)SF72338.9to $120 $8,6401471668ft feet 2.0-3.0338.9 Cross Slope (PAR)SF104352.8to $120 $12,5101471678ft feet352.8 Driveway377.0to165082 feet352.8 Driveway385.3to165083 feet .96371.3 Vertical Change REF8372.3to135663 8 ft feet .75379.0 Vertical Change REF8380.0to135664 8 ft $208,012.50TOTAL COST FOR:BICKETT STEside of Starting at:CITY BOUNDARY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 587 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W BICKETT ST Street Side E 54TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912131403 Run ID Bickett St 52.5 ID Sidewalk Width Priority feet 7.0-8.00.0 Cross Slope (PAR)SF173.3to $120 $1,9801466875ft feet 5.0-6.04.2 Cross Slope (PAR)SF3010.1to $120 $3,5401466885ft feet 3.0-4.010.8 Cross Slope (PAR)SF465103.8to $120 $55,8001466895ft feet14.1 Continuous Width REF515.1to167191 5 ft feet59.8 Continuous Width SF560.8to $120 $6001671505ft feet104.6 Continuous Width SF5105.6to $120 $6001671515ft feet 4.0-5.0108.5 Cross Slope (PAR)SF29114.3to $120 $3,4801466905ft feet 2.0-3.0117.3 Cross Slope (PAR)SF10119.3to $120 $1,2001466915ft feet121.9 Driveway149.6to165042 feet .37125.5 Vertical Change REF5126.5to135495 5 ft feet -.27138.2 Vertical Change REF5139.2to135496 5 ft feet 4.0-5.0151.1 Cross Slope (PAR)SF44159.9to $120 $5,2801466925ft feet 4.0-5.0163.1 Cross Slope (PAR)SF180199.1to $120 $21,6001466935ft feet 2.0-3.0200.4 Cross Slope (PAR)SF87217.8to $120 $10,4401466945ft feet 2.0-3.0221.3 Cross Slope (PAR)SF25226.3to $120 $3,0001466955ft feet225.3 Continuous Width SF5226.3to $120 $6001671525ft feet 2.0-3.0228.8 Cross Slope (PAR)SF22233.1to $120 $2,5801466965ft feet230.3 Continuous Width SF5231.3to $120 $6001673785ft feet 4.0-5.0234.2 Cross Slope (PAR)SF55245.2to $120 $6,6001466975ft feet 2.0-3.0245.3 Cross Slope (PAR)SF9247.0to $120 $1,0201466985ft $118,920.00TOTAL COST FOR:BICKETT STWside of Starting at:E 54TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 588 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E BICKETT ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 54TH ST End Street Name 1912131030 Run ID Bickett St 63 ID Sidewalk Width Priority feet 3.0-4.00.7 Cross Slope (PAR)SF215.4to $120 $2,5381471155ft feet 5.0-6.08.8 Cross Slope (PAR)SF59.8to $120 $5401471165ft feet 6.0-7.09.8 Cross Slope (PAR)SF611.1to $120 $7021471175ft feet 5.0-6.012.0 Cross Slope (PAR)SF1515.4to $120 $1,8361471185ft feet14.6 Continuous Width SF515.6to $120 $5401674695ft feet16.0 Cold Patch 1419.0to140325 5 ft feet .2616.7 Vertical Change LF517.7to $75 $3381356415ft feet 4.0-5.019.4 Cross Slope (PAR)SF3627.3to $120 $4,2661471195ft feet 2.0-3.028.8 Cross Slope (PAR)SF2033.2to $120 $2,3761471205ft feet31.8 Continuous Width REF432.8to167213 5 ft feet 4.0-5.034.4 Cross Slope (PAR)SF9956.3to $120 $11,8261471215ft feet 2.0-3.056.3 Cross Slope (PAR)SF3564.1to $120 $4,2121471225ft feet60.2 Continuous Width SF561.2to $120 $5401668275ft feet -.3465.9 Vertical Change LF566.9to $75 $3381356425ft feet 2.0-3.071.0 Cross Slope (PAR)SF2576.5to $120 $2,9701471235ft feet79.6 Continuous Width SF580.6to $120 $5401669195ft feet 2.0-3.081.8 Cross Slope (PAR)SF1685.3to $120 $1,8901471245ft feet 4.0-5.086.3 Cross Slope (PAR)SF1589.7to $120 $1,8361471255ft feet90.0 Cold Patch 1893.9to140326 5 ft feet 6.0-7.095.0 Cross Slope (PAR)SF696.4to $120 $7561471265ft feet 5.0-6.097.1 Cross Slope (PAR)SF46107.3to $120 $5,5081471275ft feet 4.0-5.0109.9 Cross Slope (PAR)SF94130.8to $120 $11,2861471285ft feet117.3 Continuous Width REF5118.3to167242 5 ft feet 4.0-5.0135.4 Cross Slope (PAR)SF95156.4to $120 $11,3401471295ft feet .39157.3 Vertical Change LF5158.3to $75 $3381356445ft feet 5.0-6.0158.5 Cross Slope (PAR)SF37166.7to $120 $4,4281471305ft feet 3.0-4.0166.8 Cross Slope (PAR)SF31173.6to $120 $3,6721471315ft feet 5.0-6.0173.9 Cross Slope (PAR)SF68188.9to $120 $8,1001471325ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 589 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E BICKETT ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 54TH ST End Street Name 1912131030 Run ID Bickett St 63 ID Sidewalk Width Priority feet 3.0-4.0188.9 Cross Slope (PAR)SF58201.7to $120 $6,9121471335ft feet 4.0-5.0203.9 Cross Slope (PAR)SF42213.3to $120 $5,0761471345ft feet209.3 Continuous Width REF5210.3to167192 5 ft feet 2.0-3.0214.3 Cross Slope (PAR)SF54226.2to $120 $6,4261471355ft feet218.8 Continuous Width REF5219.8to167735 5 ft feet 4.0-5.0226.2 Cross Slope (PAR)SF18230.3to $120 $2,2141471365ft feet230.3 Cold Patch 12232.9to140327 5 ft feet232.3 Continuous Width SF5233.3to $120 $5401669255ft feet .28232.4 Vertical Change LF5233.4to $75 $3381356455ft feet 3.0-4.0233.9 Cross Slope (PAR)SF6235.3to $120 $7561471375ft feet234.6 Continuous Width SF5235.6to $120 $5401669265ft feet 6.0-7.0237.6 Cross Slope (PAR)SF32244.6to $120 $3,7801471385ft feet 5.0-6.0244.8 Cross Slope (PAR)SF5245.8to $120 $5401471395ft $109,836.00TOTAL COST FOR:BICKETT STEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 590 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W BICKETT ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name 5715 BICKETT ST End Street Name 1912131409 Run ID Bickett St 35.25 ID Sidewalk Width Priority feet1.0 Driveway24.9to165040 feet 2.0-3.025.0 Cross Slope (Driveway)SF4030.0to $40 $1,6001466738ft feet34.2 Driveway75.0to165041 feet .2837.0 Vertical Change REF838.0to135486 8 ft feet .2862.2 Vertical Change REF863.2to135487 8 ft feet 2.0-3.089.0 Cross Slope (PAR)SF8799.9to $120 $10,4641466748ft feet 2.0-3.0103.7 Cross Slope (PAR)SF48109.7to $120 $5,7601466758ft feet -.3112.1 Vertical Change LF8113.1to $75 $6001354888ft feet 2.0-3.0116.9 Cross Slope (PAR)SF518181.7to $120 $62,2081466768ft feet 2.0-3.0185.4 Cross Slope (PAR)SF311224.3to $120 $37,3441466778ft feet 2.0-3.0229.3 Cross Slope (PAR)SF356273.8to $120 $42,7201466788ft feet 2.0-3.0276.2 Cross Slope (PAR)SF28279.7to $120 $3,3601466798ft feet 2.0-3.0287.2 Cross Slope (PAR)SF342329.9to $120 $40,9921466808ft feet .26328.3 Vertical Change REF8329.3to135489 8 ft feet 3.0-4.0338.6 Cross Slope (PAR)SF16340.6to $120 $1,9201466818ft feet 2.0-3.0340.6 Cross Slope (PAR)SF10341.9to $120 $1,2481466828ft feet 2.0-3.0347.4 Cross Slope (PAR)SF22350.1to $120 $2,5921466838ft feet 2.0-3.0353.5 Cross Slope (PAR)SF9354.6to $120 $1,0561466848ft feet 2.0-3.0357.8 Cross Slope (PAR)SF127373.7to $120 $15,2641466858ft feet .26364.3 Vertical Change REF23367.2to135490 8 ft feet 5.0-6.0369.4 Running Slope REF29373.0to166458 8 ft feet .54370.1 Vertical Change REF8371.1to135491 8 ft feet .47373.4 Vertical Change REF28376.9to135492 8 ft feet 2.0-3.0377.4 Cross Slope (PAR)SF106390.6to $120 $12,6721466868ft feet .29380.7 Vertical Change REF8381.7to135493 8 ft feet -.32394.1 Vertical Change LF8395.1to $75 $6001354948ft $240,400.00TOTAL COST FOR:BICKETT STWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 591 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S CHAMBERS ST Street Side HAMPTON ST Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912051057 Run ID Chambers St 71.75 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF7910.5to $120 $9,4501622378ft feet 2.0-3.012.3 Cross Slope (PAR)SF2515.6to $120 $2,9701622388ft feet .2712.9 Vertical Change REF813.9to139594 8 ft feet 4.0-5.015.6 Cross Slope (PAR)SF13433.4to $120 $16,0201622398ft feet 2.0-3.033.4 Cross Slope (PAR)SF30273.7to $120 $36,2701622408ft feet .3141.1 Vertical Change REF842.1to139595 8 ft feet 2.0-3.082.3 Cross Slope (PAR)SF8793.9to $120 $10,4401622418ft feet93.9 Driveway116.8to166276 feet93.9 Driveway147.4to166277 feet 3.0-4.0117.4 Cross Slope (Driveway)SF54124.6to $40 $2,1601622428ft feet 5.0-6.0124.6 Cross Slope (Driveway)SF37129.5to $40 $1,4701622438ft feet 3.0-4.0130.4 Cross Slope (Driveway)SF52137.3to $40 $2,0701622448ft feet -.57131.2 Vertical Change REF8132.2to139596 8 ft feet 2.0-3.0137.3 Cross Slope (Driveway)SF14139.2to $40 $5701622458ft feet 5.0-6.0145.9 Running Slope REF11147.3to166649 8 ft $81,420.00TOTAL COST FOR:CHAMBERS STSside of Starting at:HAMPTON ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 592 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N CHAMBERS ST Street Side PACIFIC BLVD Survey Street Name Starting Street Name HAMPTON ST End Street Name 1912050930 Run ID Chambers St 88.5 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF233.0to $120 $2,7001625358ft feet 2.0-3.06.4 Cross Slope (PAR)SF2910.3to $120 $3,5101625368ft feet 4.0-5.010.3 Cross Slope (PAR)SF12827.3to $120 $15,3001625378ft feet 4.0-5.031.2 Cross Slope (PAR)SF4336.9to $120 $5,1301625388ft feet 2.0-3.038.3 Cross Slope (PAR)SF5545.6to $120 $6,5701625398ft feet .6848.8 Vertical Change REF849.8to139736 8 ft feet 2.0-3.049.7 Cross Slope (PAR)SF3254.0to $120 $3,8701625408ft feet 4.0-5.055.7 Cross Slope (PAR)SF2158.5to $120 $2,5201625418ft feet 2.0-3.058.5 Cross Slope (PAR)SF5265.4to $120 $6,2101625428ft feet 2.0-3.068.1 Cross Slope (PAR)SF3372.5to $120 $3,9601625438ft feet 4.0-5.072.5 Cross Slope (PAR)SF873.5to $120 $9001625448ft feet 4.0-5.076.3 Cross Slope (PAR)SF2479.5to $120 $2,8801625458ft feet 2.0-3.083.7 Cross Slope (PAR)SF282121.3to $120 $33,8401625468ft feet -.394.1 Vertical Change REF895.1to139738 8 ft feet 3.0-4.0124.5 Cross Slope (PAR)SF45130.5to $120 $5,4001625478ft feet 2.0-3.0131.8 Cross Slope (PAR)SF10133.2to $120 $1,2601625488ft feet 4.0-5.0135.5 Cross Slope (PAR)SF29139.3to $120 $3,4201625498ft feet 2.0-3.0139.3 Cross Slope (PAR)SF9140.5to $120 $1,0801625508ft feet .26141.7 Vertical Change LF8142.7to $75 $5631397398ft feet 2.0-3.0152.3 Cross Slope (PAR)SF49158.9to $120 $5,9401625518ft feet .3156.7 Vertical Change REF8157.7to139740 8 ft feet 5.0-6.0160.3 Cross Slope (PAR)SF31164.5to $120 $3,7801625528ft feet -.4161.3 Vertical Change REF8162.3to139741 8 ft feet .37163.2 Vertical Change REF8164.2to139742 8 ft feet166.1 Driveway200.8to166309 feet .4167.0 Vertical Change REF8168.0to139743 8 ft feet -.27188.9 Vertical Change REF8189.9to139744 8 ft feet202.3 Driveway255.9to166310 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 593 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N CHAMBERS ST Street Side PACIFIC BLVD Survey Street Name Starting Street Name HAMPTON ST End Street Name 1912050930 Run ID Chambers St 88.5 ID Sidewalk Width Priority feet202.3 Driveway402.1to166311 feet .81214.9 Vertical Change REF8215.9to139745 8 ft feet -.41222.2 Vertical Change REF8223.2to139746 8 ft feet 2.0-3.0256.0 Cross Slope (Driveway)SF115271.3to $40 $4,5901625538ft feet 4.0-5.0271.3 Cross Slope (Driveway)SF23274.3to $40 $9001625548ft feet .26280.8 Vertical Change REF8281.8to139747 8 ft feet 2.0-3.0281.9 Cross Slope (Driveway)SF80292.6to $40 $3,2101625558ft feet 3.0-4.0296.5 Cross Slope (Driveway)SF43302.2to $40 $1,7101625568ft feet 3.0-4.0305.2 Cross Slope (Driveway)SF68314.3to $40 $2,7301625578ft feet 2.0-3.0314.5 Cross Slope (Driveway)SF17316.7to $40 $6601625588ft feet 2.0-3.0323.2 Cross Slope (Driveway)SF14325.1to $40 $5701625598ft feet 4.0-5.0325.8 Cross Slope (Driveway)SF20328.5to $40 $8101625608ft feet 2.0-3.0330.7 Cross Slope (Driveway)SF53337.8to $40 $2,1301625618ft feet 2.0-3.0343.8 Cross Slope (Driveway)SF11345.3to $40 $4501625628ft feet 4.0-5.0346.4 Cross Slope (Driveway)SF22349.3to $40 $8701625638ft feet 2.0-3.0350.1 Cross Slope (Driveway)SF246382.9to $40 $9,8401625648ft feet .92387.7 Vertical Change REF8388.7to139749 8 ft feet 2.0-3.0390.8 Cross Slope (Driveway)SF85402.1to $40 $3,3901625658ft feet .71393.2 Vertical Change REF8394.2to139750 8 ft $140,692.50TOTAL COST FOR:CHAMBERS STNside of Starting at:PACIFIC BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 594 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S CHARTER ST Street Side 4200 CHARTER ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191504 Run ID Charter St 73 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF398.7to $120 $4,6981483765ft feet 4.0-5.08.7 Cross Slope (PAR)SF11333.8to $120 $13,5541483775ft feet17.8 Continuous Width SF518.8to $120 $5401676165ft feet .2719.3 Vertical Change REF520.3to135960 5 ft feet35.5 Driveway100.8to165220 feet .4189.5 Vertical Change REF590.5to135961 5 ft feet 3.0-4.0103.8 Cross Slope (PAR)SF18107.7to $120 $2,1061483785ft feet 2.0-3.0107.7 Cross Slope (PAR)SF42117.0to $120 $5,0221483795ft feet -.28119.2 Vertical Change REF5120.2to135962 5 ft feet 3.0-4.0119.3 Cross Slope (PAR)SF23124.5to $120 $2,8081483805ft feet120.6 Continuous Width REF5121.6to167331 5 ft feet 5.0-6.0124.5 Cross Slope (PAR)SF19128.8to $120 $2,3221483815ft feet 3.0-4.0129.6 Cross Slope (PAR)SF14132.8to $120 $1,7281483825ft feet133.2 Driveway154.3to165221 feet 5.0-6.0155.3 Cross Slope (PAR)SF27161.3to $120 $3,2401483835ft feet 3.0-4.0161.3 Cross Slope (PAR)SF32168.4to $120 $3,8341483845ft feet 5.0-6.0171.0 Cross Slope (PAR)SF25176.6to $120 $3,0241483855ft feet 3.0-4.0176.6 Cross Slope (PAR)SF57189.2to $120 $6,8041483865ft feet184.8 Continuous Width REF5185.8to166871 5 ft feet 2.0-3.0189.2 Cross Slope (PAR)SF70204.8to $120 $8,4241483875ft feet 4.0-5.0204.8 Cross Slope (PAR)SF53216.6to $120 $6,3721483885ft feet210.8 Continuous Width SF5211.8to $120 $5401671575ft feet215.9 Continuous Width REF5216.9to167678 5 ft feet 4.0-5.0218.8 Cross Slope (PAR)SF37227.0to $120 $4,4281483895ft feet 2.0-3.0227.3 Cross Slope (PAR)SF14230.4to $120 $1,6741483905ft feet 1.1230.7 Vertical Change REF5231.7to135964 5 ft feet 5.0-6.0231.3 Cross Slope (PAR)SF27237.4to $120 $3,2941483915ft feet 3.0-4.0237.4 Cross Slope (PAR)SF42246.7to $120 $5,0221483925ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 595 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S CHARTER ST Street Side 4200 CHARTER ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191504 Run ID Charter St 73 ID Sidewalk Width Priority feet 2.0-3.0246.7 Cross Slope (PAR)SF99268.7to $120 $11,8801483935ft feet 4.0-5.0268.8 Cross Slope (PAR)SF14271.8to $120 $1,6201483945ft feet 2.0-3.0271.8 Cross Slope (PAR)SF102294.5to $120 $12,2581483955ft feet .28287.8 Vertical Change REF5288.8to135965 5 ft feet -.51290.2 Vertical Change REF5291.2to135966 5 ft feet 4.0-5.0294.8 Cross Slope (PAR)SF15298.1to $120 $1,7821483965ft feet 2.0-3.0298.1 Cross Slope (PAR)SF7299.7to $120 $8641483975ft feet 2.0-3.0302.3 Cross Slope (PAR)SF31309.1to $120 $3,6721483985ft feet 2.0-3.0311.5 Cross Slope (PAR)SF7313.0to $120 $8101483995ft feet 2.0-3.0315.6 Cross Slope (PAR)SF41324.6to $120 $4,8601484005ft feet 4.0-5.0325.3 Cross Slope (PAR)SF43334.8to $120 $5,1301484015ft feet336.0 Continuous Width REF5337.0to167679 5 ft feet 2.0-3.0336.3 Cross Slope (PAR)SF14339.5to $120 $1,7281484025ft feet -.27341.7 Vertical Change LF5342.7to $75 $3381359675ft feet341.7 Driveway372.1to165222 feet .34354.5 Vertical Change REF5355.5to135968 5 ft feet 5.0-6.0373.1 Cross Slope (PAR)SF32380.3to $120 $3,8881484035ft feet .29373.5 Vertical Change REF5374.5to135969 5 ft feet 3.0-4.0381.0 Cross Slope (PAR)SF5382.2to $120 $6481484045ft feet 2.0-3.0382.3 Cross Slope (PAR)SF24387.6to $120 $2,8621484055ft feet394.8 Driveway457.3to165223 feet .42411.7 Vertical Change REF5412.7to135970 5 ft feet -.37415.6 Vertical Change REF5416.6to135971 5 ft feet -.32423.5 Vertical Change REF5424.5to135972 5 ft feet -.46432.6 Vertical Change REF5433.6to135973 5 ft feet .3435.3 Vertical Change REF5436.3to135974 5 ft feet 2.0-3.0458.0 Cross Slope (PAR)SF23463.0to $120 $2,7001484065ft feet461.7 Continuous Width SF5462.7to $120 $5401668295ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 596 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S CHARTER ST Street Side 4200 CHARTER ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191504 Run ID Charter St 73 ID Sidewalk Width Priority feet 4.0-5.0463.4 Cross Slope (PAR)SF5464.4to $120 $5401484075ft feet465.4 Driveway502.2to165224 feet .7474.5 Vertical Change REF5475.5to135975 5 ft feet 2.0-3.0511.7 Cross Slope (PAR)SF86530.9to $120 $10,3681484085ft feet 4.0-5.0532.8 Cross Slope (PAR)SF20537.2to $120 $2,3761484095ft feet 3.0-4.0539.4 Cross Slope (PAR)SF50550.6to $120 $6,0481484105ft feet 5.0-6.0550.6 Cross Slope (PAR)SF18554.7to $120 $2,2141484115ft feet 2.0-3.0556.8 Cross Slope (PAR)SF18560.8to $120 $2,1601484125ft feet 4.0-5.0562.1 Cross Slope (PAR)SF10564.4to $120 $1,2421484135ft feet -.28564.4 Vertical Change REF5565.4to135976 5 ft feet564.4 Driveway586.3to165225 feet 6.0-7.0587.7 Cross Slope (PAR)SF61601.2to $120 $7,2901484145ft feet 5.0-6.0601.2 Cross Slope (PAR)SF50612.2to $120 $5,9401484155ft feet 3.0-4.0612.2 Cross Slope (PAR)SF56624.7to $120 $6,7501484165ft feet 5.0-6.0625.0 Cross Slope (PAR)SF29631.4to $120 $3,4561484175ft feet 3.0-4.0632.2 Cross Slope (PAR)SF63646.3to $120 $7,6141484185ft feet636.8 Continuous Width SF5637.8to $120 $5401671325ft feet 5.0-6.0647.0 Cross Slope (PAR)SF22651.8to $120 $2,5921484195ft feet653.7 Continuous Width SF5654.7to $120 $5401673245ft feet 4.0-5.0653.9 Cross Slope (PAR)SF128682.4to $120 $15,3901484205ft feet .27655.0 Vertical Change REF5656.0to135978 5 ft feet 2.0-3.0682.4 Cross Slope (PAR)SF18686.3to $120 $2,1061484215ft feet 4.0-5.0686.3 Cross Slope (PAR)SF17690.1to $120 $2,0521484225ft feet .27691.0 Vertical Change LF5692.0to $75 $3381359795ft feet691.0 Driveway712.5to165226 feet 3.0-4.0713.4 Cross Slope (PAR)SF18717.3to $120 $2,1061484235ft feet 5.0-6.0717.3 Cross Slope (PAR)SF121744.1to $120 $14,4721484245ft feet733.3 Continuous Width SF5734.3to $120 $5401676175ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 597 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S CHARTER ST Street Side 4200 CHARTER ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191504 Run ID Charter St 73 ID Sidewalk Width Priority feet742.1 Continuous Width REF5743.1to166963 5 ft feet 3.0-4.0744.1 Cross Slope (PAR)SF25749.6to $120 $2,9701484255ft feet745.6 Continuous Width REF5746.6to166872 5 ft feet750.8 Driveway772.8to165227 feet .29771.8 Vertical Change REF5772.8to135980 5 ft feet 3.0-4.0773.3 Cross Slope (Driveway)SF82791.6to $40 $3,2941484265ft feet 5.0-6.0791.8 Cross Slope (PAR)SF36799.8to $120 $4,3201484275ft feet -.31799.4 Vertical Change REF5800.4to135981 5 ft feet799.8 Driveway820.6to165228 feet799.8 Driveway865.8to165229 feet .29820.0 Vertical Change REF5821.0to135982 5 ft feet 5.0-6.0821.8 Cross Slope (Driveway)SF27827.7to $40 $1,0621484285ft feet 4.0-5.0829.8 Cross Slope (Driveway)SF79847.3to $40 $3,1501484295ft feet 2.0-3.0847.3 Cross Slope (Driveway)SF23852.5to $40 $9361484305ft feet 4.0-5.0852.5 Cross Slope (Driveway)SF48863.1to $40 $1,9081484315ft feet864.2 Continuous Width SF5865.2to $120 $5401672795ft feet 2.0-3.0864.5 Cross Slope (Driveway)SF6865.8to $40 $2341484325ft $250,101.00TOTAL COST FOR:CHARTER STSside of Starting at:4200 CHARTER ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 598 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE CHARTER ST Street Side 4295 CHARTER ST Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912191425 Run ID Charter St 74.25 ID Sidewalk Width Priority feet 3.0-4.01.3 Cross Slope (PAR)SF6816.3to $120 $8,1001484755ft feet -.435.9 Vertical Change REF56.9to136001 5 ft feet9.2 Continuous Width REF410.2to166948 5 ft feet 2.0-3.016.3 Cross Slope (PAR)SF918.3to $120 $1,0801484765ft feet 2.0-3.030.4 Cross Slope (PAR)SF12558.2to $120 $15,0121484775ft feet -.3146.9 Vertical Change REF547.9to136002 5 ft feet .8550.0 Vertical Change REF551.0to136003 5 ft feet -.2659.4 Vertical Change LF560.4to $75 $3381360045ft feet 3.0-4.060.9 Cross Slope (PAR)SF862.6to $120 $9181484785ft feet .3161.7 Vertical Change REF562.7to136005 5 ft feet 2.0-3.062.8 Cross Slope (PAR)SF664.2to $120 $7561484795ft feet 4.0-5.065.6 Cross Slope (PAR)SF3673.7to $120 $4,3741484805ft feet 2.0-3.073.7 Cross Slope (PAR)SF3080.3to $120 $3,5641484815ft feet 2.0-3.099.3 Cross Slope (PAR)SF5100.5to $120 $6481484825ft feet 2.0-3.0103.9 Cross Slope (PAR)SF6105.2to $120 $7021484835ft feet 2.0-3.0110.3 Cross Slope (PAR)SF26116.1to $120 $3,1321484845ft feet -.29113.2 Vertical Change REF5114.2to136006 5 ft feet 3.0-4.0118.2 Cross Slope (PAR)SF33125.5to $120 $3,9421484855ft feet 3.0-4.0127.8 Cross Slope (PAR)SF21132.5to $120 $2,5381484865ft feet 2.0-3.0132.5 Cross Slope (PAR)SF9134.4to $120 $1,0261484875ft feet 2.0-3.0136.8 Cross Slope (PAR)SF51148.1to $120 $6,1021484885ft feet 2.0-3.0151.4 Cross Slope (PAR)SF50162.6to $120 $6,0481484895ft feet 2.0-3.0197.5 Cross Slope (PAR)SF13200.3to $120 $1,5121484905ft feet 4.0-5.0200.3 Cross Slope (PAR)SF43209.8to $120 $5,1301484915ft feet -.26206.9 Vertical Change REF5207.9to136007 5 ft feet 2.0-3.0220.0 Cross Slope (PAR)SF10222.3to $120 $1,2421484925ft feet 2.0-3.0226.0 Cross Slope (PAR)SF110250.4to $120 $13,1761484935ft feet 2.0-3.0253.1 Cross Slope (PAR)SF110277.6to $120 $13,2301484945ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 599 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE CHARTER ST Street Side 4295 CHARTER ST Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912191425 Run ID Charter St 74.25 ID Sidewalk Width Priority feet 2.0-3.0280.8 Cross Slope (PAR)SF17284.5to $120 $1,9981484955ft feet 4.0-5.0284.5 Cross Slope (PAR)SF55296.8to $120 $6,6421484965ft feet -.3291.9 Vertical Change REF5292.9to136008 5 ft feet 2.0-3.0297.1 Cross Slope (PAR)SF20301.6to $120 $2,4301484975ft feet 4.0-5.0302.3 Cross Slope (PAR)SF16305.8to $120 $1,8901484985ft feet 2.0-3.0306.7 Cross Slope (PAR)SF54318.7to $120 $6,4801484995ft feet 4.0-5.0319.8 Cross Slope (PAR)SF6321.2to $120 $7561485005ft feet 2.0-3.0322.4 Cross Slope (PAR)SF8324.2to $120 $9721485015ft feet 3.0-4.0326.4 Cross Slope (PAR)SF153360.3to $120 $18,3061485025ft feet 2.0-3.0361.3 Cross Slope (PAR)SF18365.3to $120 $2,1601485035ft feet 4.0-5.0365.4 Cross Slope (PAR)SF35373.1to $120 $4,1581485045ft feet 2.0-3.0374.2 Cross Slope (PAR)SF14377.3to $120 $1,6741485055ft feet 2.0-3.0379.9 Cross Slope (PAR)SF95401.1to $120 $11,4481485065ft feet401.6 Driveway427.9to165235 feet -.28412.9 Vertical Change REF5413.9to136009 5 ft feet 2.0-3.0430.3 Cross Slope (PAR)SF61443.8to $120 $7,2901485075ft feet433.9 Continuous Width SF5434.9to $120 $5401676185ft feet 4.0-5.0444.0 Cross Slope (PAR)SF32451.1to $120 $3,8341485085ft feet 2.0-3.0451.8 Cross Slope (PAR)SF25457.3to $120 $2,9701485095ft feet 2.0-3.0465.6 Cross Slope (PAR)SF39474.3to $120 $4,6981485105ft feet 2.0-3.0483.3 Cross Slope (PAR)SF41492.3to $120 $4,8601485115ft feet .39496.9 Vertical Change REF5497.9to136010 5 ft feet 2.0-3.0497.3 Cross Slope (PAR)SF60510.7to $120 $7,2361485125ft feet 4.0-5.0511.1 Cross Slope (PAR)SF47521.6to $120 $5,6701485135ft feet519.0 Continuous Width SF5520.0to $120 $5401675725ft feet 2.0-3.0521.9 Cross Slope (PAR)SF21526.6to $120 $2,5381485145ft feet 4.0-5.0526.6 Cross Slope (PAR)SF32533.7to $120 $3,8341485155ft feet534.6 Driveway587.8to165236 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 600 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE CHARTER ST Street Side 4295 CHARTER ST Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912191425 Run ID Charter St 74.25 ID Sidewalk Width Priority feet .32549.6 Vertical Change REF5550.6to136011 5 ft feet -.42561.8 Vertical Change REF5562.8to136012 5 ft feet 1.24570.8 Vertical Change REF5571.8to136013 5 ft feet 4.0-5.0587.8 Cross Slope (Driveway)SF41596.8to $40 $1,6201485165ft feet 3.0-4.0600.8 Cross Slope (PAR)SF48611.4to $120 $5,7241485175ft feet -.28601.6 Vertical Change REF5602.6to136014 5 ft feet 5.0-6.0611.4 Cross Slope (PAR)SF18615.3to $120 $2,1061485185ft feet 3.0-4.0615.3 Cross Slope (PAR)SF14618.4to $120 $1,6741485195ft feet620.9 Continuous Width SF5621.9to $120 $5401676195ft feet 3.0-4.0622.0 Cross Slope (PAR)SF49632.8to $120 $5,8321485205ft feet 5.0-6.0632.8 Cross Slope (PAR)SF23637.9to $120 $2,7541485215ft feet 6.0-7.0637.9 Cross Slope (PAR)SF14641.0to $120 $1,6741485225ft feet 5.0-6.0641.0 Cross Slope (PAR)SF10643.3to $120 $1,2421485235ft feet 3.0-4.0643.3 Cross Slope (PAR)SF19647.5to $120 $2,2681485245ft feet 2.0-3.0648.3 Cross Slope (PAR)SF47658.8to $120 $5,6701485255ft feet .49651.7 Vertical Change REF5652.7to136015 5 ft feet 4.0-5.0659.0 Cross Slope (PAR)SF18662.9to $120 $2,1061485265ft feet 2.0-3.0663.4 Cross Slope (PAR)SF15666.8to $120 $1,8361485275ft feet 4.0-5.0667.7 Cross Slope (PAR)SF20672.1to $120 $2,3761485285ft feet 3.0-4.0675.0 Cross Slope (PAR)SF157709.8to $120 $18,7921485295ft feet 2.0-3.0710.3 Cross Slope (PAR)SF23715.4to $120 $2,7541485305ft feet 5.0-6.0717.0 Running Slope SF5718.2to $120 $6481664665ft feet718.5 Driveway734.5to165237 feet734.5 Continuous Width SF5735.5to $120 $5401674395ft feet 4.0-5.0734.7 Cross Slope (PAR)SF60748.1to $120 $7,2361485315ft feet .52747.8 Vertical Change REF5748.8to136017 5 ft feet748.5 Driveway772.3to165238 feet -.26771.9 Vertical Change REF5772.9to136018 5 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 601 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE CHARTER ST Street Side 4295 CHARTER ST Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912191425 Run ID Charter St 74.25 ID Sidewalk Width Priority feet 3.0-4.0773.8 Cross Slope (PAR)SF18777.8to $120 $2,1601485325ft feet 2.0-3.0778.2 Cross Slope (PAR)SF52789.7to $120 $6,2101485335ft feet 4.0-5.0789.9 Cross Slope (PAR)SF72805.8to $120 $8,5861485345ft feet 2.0-3.0805.8 Cross Slope (PAR)SF167842.8to $120 $19,9801485355ft feet .31838.8 Vertical Change REF5839.8to136019 5 ft feet841.8 Continuous Width SF5842.8to $120 $5401675945ft feet 4.0-5.0842.8 Cross Slope (PAR)SF65857.3to $120 $7,8301485365ft feet .35848.6 Vertical Change REF5849.6to136020 5 ft feet .27854.4 Vertical Change REF5855.4to136021 5 ft feet 2.0-3.0857.6 Cross Slope (PAR)SF7859.1to $120 $8101485375ft feet -.27858.4 Vertical Change REF5859.4to136022 5 ft feet 2.0-3.0861.9 Cross Slope (PAR)SF38870.4to $120 $4,5901485385ft feet 4.0-5.0870.8 Cross Slope (PAR)SF68885.9to $120 $8,1541485395ft feet -.33883.7 Vertical Change REF5884.7to136023 5 ft $321,745.50TOTAL COST FOR:CHARTER STNEside of Starting at:4295 CHARTER ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 602 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CHARTER ST Street Side DRIVEWAY Survey Street Name Starting Street Name ROAD BLOCKED End Street Name 1912191404 Run ID Charter St 40 ID Sidewalk Width Priority feet -.421.3 Vertical Change LF42.3to $75 $3381360255ft feet 2.0-3.02.9 Cross Slope (PAR)SF146.0to $120 $1,6741485465ft feet .617.7 Vertical Change SF48.7to $75 $3381360265ft feet8.7 Driveway36.3to165239 feet 3.0-4.037.3 Cross Slope (PAR)SF2242.1to $120 $2,5921485475ft feet40.5 Continuous Width SF541.5to $120 $5401675135ft feet 2.0-3.042.7 Cross Slope (PAR)SF2448.0to $120 $2,8621485485ft feet 4.0-5.049.3 Cross Slope (PAR)SF3456.9to $120 $4,1041485495ft feet57.8 Driveway85.7to165240 $12,447.00TOTAL COST FOR:CHARTER STEside of Starting at:DRIVEWAY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 603 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CHARTER ST Street Side DRIVEWAY Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912191406 Run ID Charter St 60 ID Sidewalk Width Priority feet 13.0-14.00.1 Cross Slope (PAR)SF6815.1to $120 $8,1001485405ft feet -.3412.1 Vertical Change REF513.1to136024 5 ft feet 1515.3 Cross Slope (PAR)SF1217.9to $120 $1,4041485415ft feet 13.0-14.017.9 Cross Slope (PAR)SF5029.1to $120 $6,0481485425ft feet 3.0-4.033.6 Cross Slope (PAR)SF835.3to $120 $9181485435ft feet 2.0-3.037.3 Cross Slope (PAR)SF14168.6to $120 $16,9021485445ft feet38.2 Continuous Width SF539.2to $120 $5401674735ft feet66.3 Continuous Width SF567.3to $120 $5401671225ft feet 4.0-5.068.6 Cross Slope (PAR)SF870.3to $120 $9181485455ft $35,370.00TOTAL COST FOR:CHARTER STEside of Starting at:DRIVEWAY October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 604 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CHARTER ST Street Side EXCHANGE AVE Survey Street Name Starting Street Name ROAD BLOCKED End Street Name 1912191402 Run ID Charter St 52.5 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF61.3to $120 $7021485505ft feet 2.0-3.03.3 Cross Slope (PAR)SF4212.6to $120 $5,0221485515ft feet9.0 Continuous Width REF510.0to166940 5 ft feet 4.0-5.012.8 Cross Slope (PAR)SF11237.8to $120 $13,5001485525ft feet31.2 Continuous Width SF532.2to $120 $5401674115ft feet 2.0-3.037.8 Cross Slope (PAR)SF1541.2to $120 $1,8361485535ft feet 4.0-5.041.2 Cross Slope (PAR)SF1243.8to $120 $1,4041485545ft feet 2.0-3.044.3 Cross Slope (PAR)SF3251.5to $120 $3,8881485555ft feet 4.0-5.051.7 Cross Slope (PAR)SF3659.8to $120 $4,3741485565ft feet51.8 Continuous Width SF552.8to $120 $5401671165ft feet60.7 Driveway91.8to165241 feet -.3292.9 Vertical Change LF593.9to $75 $3381360275ft feet 3.0-4.094.9 Cross Slope (PAR)SF89114.7to $120 $10,6921485575ft feet115.4 Continuous Width SF5116.4to $120 $5401671175ft feet 5.0-6.0115.8 Cross Slope (PAR)SF19120.1to $120 $2,3221485585ft feet 3.0-4.0120.1 Cross Slope (PAR)SF43129.7to $120 $5,1841485595ft feet125.8 Continuous Width SF5126.8to $120 $5401674575ft feet 2.0-3.0129.7 Cross Slope (PAR)SF43139.3to $120 $5,1841485605ft feet 4.0-5.0139.3 Cross Slope (PAR)SF14142.4to $120 $1,6741485615ft feet 2.0-3.0142.4 Cross Slope (PAR)SF10144.7to $120 $1,2421485625ft feet145.3 Driveway168.8to165242 feet .28163.3 Vertical Change REF4164.3to136028 5 ft $59,521.50TOTAL COST FOR:CHARTER STEside of Starting at:EXCHANGE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 605 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S CHARTER ST Street Side S DOWNEY RD Survey Street Name Starting Street Name ROAD BLOCKED End Street Name 1912191447 Run ID Charter St 58 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF194.2to $120 $2,2681484335ft feet -.285.4 Vertical Change LF56.4to $75 $3381359835ft feet5.8 Driveway20.3to165230 feet 4.0-5.022.4 Cross Slope (PAR)SF4532.4to $120 $5,4001484345ft feet26.6 Continuous Width SF527.6to $120 $5401678515ft feet32.4 Continuous Width SF533.4to $120 $5401670145ft feet 2.0-3.032.6 Cross Slope (PAR)SF3740.9to $120 $4,4821484355ft feet50.7 Continuous Width SF551.7to $120 $5401668215ft feet 2.0-3.053.3 Cross Slope (PAR)SF554.3to $120 $5401484365ft feet55.0 Driveway94.6to165231 feet -.2786.4 Vertical Change REF587.4to135984 5 ft feet 4.0-5.096.9 Cross Slope (PAR)SF41106.1to $120 $4,9681484375ft feet107.1 Driveway127.5to165232 feet -.42114.0 Vertical Change REF5115.0to135985 5 ft $19,615.50TOTAL COST FOR:CHARTER STSside of Starting at:S DOWNEY RD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 606 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N CHARTER ST Street Side S MAYWOOD AVE Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912191441 Run ID Charter St 67 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF194.2to $120 $2,2681484385ft feet 4.0-5.04.2 Cross Slope (PAR)SF198.4to $120 $2,2681484395ft feet 2.0-3.08.4 Cross Slope (PAR)SF6522.8to $120 $7,7761484405ft feet18.6 Continuous Width SF519.6to $120 $5401671095ft feet22.8 Cold Patch 1626.4to140336 5 ft feet 4.0-5.027.4 Cross Slope (PAR)SF1430.5to $120 $1,6741484415ft feet -.4231.3 Vertical Change LF432.3to $75 $3381359865ft feet31.9 Cold Patch 1034.2to140337 5 ft feet .2633.3 Vertical Change LF534.3to $75 $3381359875ft feet34.7 Continuous Width SF535.7to $120 $5401674375ft feet 5.0-6.036.2 Cross Slope (PAR)SF10058.4to $120 $11,9881484425ft feet .2655.3 Vertical Change REF556.3to135988 5 ft feet 3.0-4.058.4 Cross Slope (PAR)SF4568.5to $120 $5,4541484435ft feet -.3763.9 Vertical Change REF564.9to135989 5 ft feet 2.0-3.068.5 Cross Slope (PAR)SF4678.7to $120 $5,5081484445ft feet 3.0-4.080.9 Cross Slope (PAR)SF7697.9to $120 $9,1801484455ft feet102.6 Continuous Width SF5103.6to $120 $5401674715ft feet .26103.6 Vertical Change LF5104.6to $75 $3381359905ft feet 2.0-3.0114.8 Cross Slope (PAR)SF109139.1to $120 $13,1221484465ft feet122.5 Continuous Width REF5123.5to167181 5 ft feet126.7 Continuous Width SF5127.7to $120 $5401675025ft feet 4.0-5.0139.9 Cross Slope (PAR)SF9142.0to $120 $1,1341484475ft feet 2.0-3.0148.4 Cross Slope (PAR)SF5149.5to $120 $5941484485ft feet .49148.6 Vertical Change REF5149.6to135991 5 ft $64,138.50TOTAL COST FOR:CHARTER STNside of Starting at:S MAYWOOD AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 607 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CHARTER ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name EXCHANGE AVE End Street Name 1912191517 Run ID Charter St 60 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF8619.1to $120 $10,3141483475ft feet 2.0-3.019.1 Cross Slope (PAR)SF1522.4to $120 $1,7821483485ft feet 4.0-5.022.4 Cross Slope (PAR)SF3630.5to $120 $4,3741483495ft feet 2.0-3.031.2 Cross Slope (PAR)SF933.1to $120 $1,0261483505ft feet35.8 Driveway73.8to165217 feet 6.0-7.074.4 Cross Slope (Driveway)SF1778.2to $40 $6841483515ft feet79.4 Continuous Width SF580.4to $120 $5401668285ft feet 5.0-6.079.5 Cross Slope (PAR)SF2083.9to $120 $2,3761483525ft feet 6.0-7.083.9 Cross Slope (PAR)SF1487.1to $120 $1,7281483535ft feet -.2785.2 Vertical Change REF586.2to135958 5 ft feet 5.0-6.087.1 Cross Slope (PAR)SF1189.5to $120 $1,2961483545ft feet89.5 Driveway118.7to165218 feet 3.0-4.0119.9 Cross Slope (PAR)SF23125.0to $120 $2,7541483555ft feet125.0 Driveway142.2to165219 feet 2.0-3.0148.1 Cross Slope (PAR)SF37156.3to $120 $4,4281483565ft feet 2.0-3.0163.3 Cross Slope (PAR)SF4164.3to $120 $5401483575ft feet 3.0-4.0167.5 Cross Slope (PAR)SF38176.0to $120 $4,5901483585ft feet 2.0-3.0176.2 Cross Slope (PAR)SF57188.8to $120 $6,8041483595ft feet187.7 Continuous Width REF5188.7to167329 5 ft feet 3.0-4.0191.4 Cross Slope (PAR)SF102214.0to $120 $12,2041483605ft feet 3.0-4.0217.5 Cross Slope (PAR)SF5218.7to $120 $6481483615ft feet 2.0-3.0218.9 Cross Slope (PAR)SF54230.8to $120 $6,4261483625ft feet219.7 Continuous Width SF5220.7to $120 $5401674705ft feet 3.0-4.0237.3 Cross Slope (PAR)SF13240.2to $120 $1,5661483635ft feet 2.0-3.0240.4 Cross Slope (PAR)SF33247.8to $120 $3,9961483645ft feet 4.0-5.0248.1 Cross Slope (PAR)SF47258.5to $120 $5,6161483655ft feet 2.0-3.0258.5 Cross Slope (PAR)SF35266.3to $120 $4,2121483665ft feet 4.0-5.0266.3 Cross Slope (PAR)SF65280.8to $120 $7,8301483675ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 608 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CHARTER ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name EXCHANGE AVE End Street Name 1912191517 Run ID Charter St 60 ID Sidewalk Width Priority feet 2.0-3.0281.7 Cross Slope (PAR)SF102304.3to $120 $12,2041483685ft feet 4.0-5.0305.4 Cross Slope (PAR)SF9307.3to $120 $1,0261483695ft feet 2.0-3.0308.2 Cross Slope (PAR)SF5309.2to $120 $5401483705ft feet 4.0-5.0314.1 Cross Slope (PAR)SF12316.7to $120 $1,4041483715ft feet 2.0-3.0316.7 Cross Slope (PAR)SF40325.5to $120 $4,7521483725ft feet 5.0-6.0327.0 Cross Slope (PAR)SF36334.9to $120 $4,2661483735ft feet 3.0-4.0335.9 Cross Slope (PAR)SF36344.0to $120 $4,3741483745ft feet 2.0-3.0344.0 Cross Slope (PAR)SF36352.1to $120 $4,3741483755ft feet346.8 Continuous Width SF5347.8to $120 $5401671145ft $119,754.00TOTAL COST FOR:CHARTER STWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 609 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CORONA AVE Street Side DISTRICT BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912181320 Run ID Corona Ave 61.25 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF405.3to $120 $4,7701499528ft feet 4.0-5.05.8 Cross Slope (PAR)SF309.8to $120 $3,6001499538ft feet 2.0-3.010.8 Cross Slope (PAR)SF20838.5to $120 $24,9301499548ft feet 4.0-5.039.3 Cross Slope (PAR)SF3043.3to $120 $3,6001499558ft feet 3.0-4.046.2 Cross Slope (PAR)SF1948.7to $120 $2,2501499568ft feet 2.0-3.049.0 Cross Slope (PAR)SF3553.7to $120 $4,2301499578ft feet 6.0-7.054.5 Running Slope SF1456.4to $120 $1,7101664738ft feet 8.0-9.058.0 Cross Slope (PAR)SF2961.8to $120 $3,4201499588ft feet 10.0-11.062.2 Cross Slope (PAR)SF1964.7to $120 $2,2501499598ft feet 7.0-8.065.0 Cross Slope (PAR)SF14083.7to $120 $16,8301499608ft feet 7.0-8.084.3 Running Slope SF1085.6to $120 $1,1701664748ft feet -.3286.4 Vertical Change LF887.4to $75 $5631363628ft feet 5.0-6.093.3 Running Slope REF1194.8to166475 8 ft feet 2.0-3.093.6 Cross Slope (Driveway)SF2596.9to $40 $9901499618ft $70,312.50TOTAL COST FOR:CORONA AVEWside of Starting at:DISTRICT BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 610 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CORONA AVE Street Side E 48TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912181315 Run ID Corona Ave 35 ID Sidewalk Width Priority feet 2.0-3.07.9 Cross Slope (PAR)SF10822.3to $120 $12,9601499748ft feet 4.0-5.023.3 Cross Slope (PAR)SF2626.7to $120 $3,0601499758ft feet 2.0-3.027.3 Cross Slope (PAR)SF2330.4to $120 $2,7901499768ft feet 2.0-3.034.3 Cross Slope (PAR)SF2637.7to $120 $3,0601499778ft feet 4.0-5.040.6 Cross Slope (PAR)SF1943.1to $120 $2,2501499788ft feet 2.0-3.044.5 Cross Slope (PAR)SF5351.5to $120 $6,3001499798ft feet .2949.5 Vertical Change REF850.5to136365 8 ft feet 2.0-3.054.5 Cross Slope (PAR)SF4160.0to $120 $4,9501499808ft feet 4.0-5.060.0 Cross Slope (PAR)SF1962.5to $120 $2,2501499818ft feet 2.0-3.062.5 Cross Slope (PAR)SF863.5to $120 $9001499828ft feet 2.0-3.065.6 Cross Slope (PAR)SF966.8to $120 $1,0801499838ft feet 4.0-5.069.0 Cross Slope (PAR)SF2972.9to $120 $3,5101499848ft feet 2.0-3.074.2 Cross Slope (PAR)SF9286.5to $120 $11,0701499858ft feet 3.0-4.088.6 Cross Slope (PAR)SF2792.2to $120 $3,2401499868ft feet92.6 Driveway109.8to164442 $57,420.00TOTAL COST FOR:CORONA AVEEside of Starting at:E 48TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 611 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CORONA AVE Street Side E 48TH ST Survey Street Name Starting Street Name E 49TH ST End Street Name 1912171528 Run ID Corona Ave 45.5 ID Sidewalk Width Priority feet 2.0-3.00.4 Cross Slope (PAR)SF263.9to $120 $3,1501505688ft feet 3.0-4.08.0 Cross Slope (PAR)SF9220.2to $120 $10,9801505698ft feet -.7218.7 Vertical Change REF819.7to136530 8 ft feet 3.0-4.022.5 Cross Slope (PAR)SF6731.4to $120 $8,0101505708ft feet 2.0-3.032.6 Cross Slope (PAR)SF5339.6to $120 $6,3001505718ft feet 4.0-5.041.0 Cross Slope (PAR)SF26676.4to $120 $31,8601505728ft feet 2.0-3.077.2 Cross Slope (PAR)SF2480.4to $120 $2,8801505738ft feet 4.0-5.080.4 Cross Slope (PAR)SF339125.6to $120 $40,6801505748ft feet .29112.2 Vertical Change REF8113.2to136531 8 ft feet 4.0-5.0127.8 Cross Slope (PAR)SF55135.2to $120 $6,6601505758ft feet 6.0-7.0135.2 Cross Slope (PAR)SF20137.8to $120 $2,3401505768ft feet 4.0-5.0139.2 Cross Slope (PAR)SF148158.9to $120 $17,7301505778ft feet 4.0-5.0161.7 Cross Slope (PAR)SF38166.7to $120 $4,5001505788ft feet 2.0-3.0167.2 Cross Slope (PAR)SF16169.3to $120 $1,8901505798ft feet .43167.8 Vertical Change REF8168.8to136532 8 ft feet 4.0-5.0172.0 Cross Slope (PAR)SF122188.3to $120 $14,6701505808ft $151,650.00TOTAL COST FOR:CORONA AVEWside of Starting at:E 48TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 612 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CORONA AVE Street Side E 49TH ST Survey Street Name Starting Street Name E 48TH ST End Street Name 1912171525 Run ID Corona Ave 45.5 ID Sidewalk Width Priority feet 2.0-3.013.9 Cross Slope (PAR)SF4219.5to $120 $5,0401505818ft feet 3.0-4.029.2 Cross Slope (PAR)SF2232.1to $120 $2,6101505828ft feet 2.0-3.032.8 Cross Slope (PAR)SF6040.8to $120 $7,2001505838ft feet .3441.2 Vertical Change LF842.2to $75 $5631365338ft feet 2.0-3.045.7 Cross Slope (PAR)SF2749.3to $120 $3,2401505848ft feet 2.0-3.054.6 Cross Slope (PAR)SF4660.7to $120 $5,4901505858ft feet 2.0-3.066.3 Cross Slope (PAR)SF12282.5to $120 $14,5801505868ft feet .2866.9 Vertical Change REF867.9to136534 8 ft feet 2.0-3.085.8 Cross Slope (PAR)SF3590.5to $120 $4,2301505878ft feet 4.0-5.090.8 Cross Slope (PAR)SF4196.3to $120 $4,9501505888ft feet .2892.6 Vertical Change REF893.6to136535 8 ft feet 2.0-3.096.3 Cross Slope (PAR)SF1197.8to $120 $1,3501505898ft feet 5.0-6.0103.8 Cross Slope (PAR)SF26107.3to $120 $3,1501505908ft feet -.26106.6 Vertical Change REF8107.6to136536 8 ft feet 3.0-4.0107.9 Cross Slope (PAR)SF11109.3to $120 $1,2601505918ft feet 2.0-3.0114.6 Cross Slope (PAR)SF13116.3to $120 $1,5301505928ft feet .47118.7 Vertical Change LF8119.7to $75 $5631365378ft feet 2.0-3.0123.7 Cross Slope (PAR)SF76133.8to $120 $9,0901505938ft feet 4.0-5.0133.8 Cross Slope (PAR)SF37138.7to $120 $4,4101505948ft feet 2.0-3.0138.8 Cross Slope (PAR)SF10140.2to $120 $1,2601505958ft feet 2.0-3.0144.2 Cross Slope (PAR)SF325187.5to $120 $38,9701505968ft feet 2.0-3.0189.8 Cross Slope (PAR)SF58197.5to $120 $6,9301505978ft feet 2.0-3.0212.6 Cross Slope (PAR)SF9213.8to $120 $1,0801505988ft feet 4.0-5.0214.4 Cross Slope (PAR)SF29218.3to $120 $3,5101505998ft feet 4.0-5.0220.4 Cross Slope (PAR)SF26223.8to $120 $3,0601506008ft $124,065.00TOTAL COST FOR:CORONA AVEEside of Starting at:E 49TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 613 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CORONA AVE Street Side E 49TH ST Survey Street Name Starting Street Name E 50TH ST End Street Name 1912171222 Run ID Corona Ave 44 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF10113.4to $120 $12,0601510448ft feet 2.0-3.015.2 Cross Slope (PAR)SF14334.2to $120 $17,1001510458ft feet 2.0-3.041.4 Cross Slope (PAR)SF5648.8to $120 $6,6601510468ft feet57.9 Driveway136.8to164440 feet .890.0 Vertical Change REF891.0to136645 8 ft feet .2996.4 Vertical Change REF897.4to136646 8 ft feet -.39112.8 Vertical Change REF8113.8to136647 8 ft feet .28125.6 Vertical Change REF8126.6to136648 8 ft feet 2.0-3.0136.9 Cross Slope (Driveway)SF60144.9to $40 $2,4001510478ft feet 4.0-5.0144.9 Cross Slope (PAR)SF86156.4to $120 $10,3501510488ft feet 2.0-3.0156.6 Cross Slope (PAR)SF36161.4to $120 $4,3201510498ft feet 4.0-5.0161.6 Cross Slope (PAR)SF32165.9to $120 $3,8701510508ft feet 2.0-3.0165.9 Cross Slope (PAR)SF38170.9to $120 $4,5001510518ft feet 4.0-5.0171.2 Cross Slope (PAR)SF31175.3to $120 $3,6901510528ft feet 2.0-3.0175.3 Cross Slope (PAR)SF126192.1to $120 $15,1201510538ft feet 1.41192.6 Vertical Change SF8193.6to $75 $5631366498ft $80,632.50TOTAL COST FOR:CORONA AVEWside of Starting at:E 49TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 614 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CORONA AVE Street Side E 50TH ST Survey Street Name Starting Street Name E 49TH ST End Street Name 1912171218 Run ID Corona Ave 45.25 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF405.3to $120 $4,7701510548ft feet 4.0-5.05.3 Cross Slope (PAR)SF31447.2to $120 $37,7101510558ft feet 2.0-3.048.8 Cross Slope (PAR)SF6357.2to $120 $7,5601510568ft feet57.2 Driveway111.9to164441 feet -.2657.4 Vertical Change REF858.4to136650 8 ft feet 6.0-7.0112.3 Running Slope REF17114.6to166477 8 ft feet .78113.0 Vertical Change SF8114.0to $75 $5631366518ft feet 4.0-5.0115.5 Cross Slope (PAR)SF21118.3to $120 $2,5201510578ft feet -.43118.3 Vertical Change REF8119.3to136652 8 ft feet 2.0-3.0122.2 Cross Slope (PAR)SF99135.4to $120 $11,8801510588ft feet .31126.3 Vertical Change REF8127.3to136653 8 ft feet139.0 Driveway161.8to165441 feet 2.0-3.0162.8 Cross Slope (PAR)SF298202.6to $120 $35,8201510598ft feet .29175.9 Vertical Change REF8176.9to136654 8 ft feet .28189.9 Vertical Change REF8190.9to136655 8 ft $100,822.50TOTAL COST FOR:CORONA AVEEside of Starting at:E 50TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 615 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CORONA AVE Street Side E 50TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912171205 Run ID Corona Ave 32 ID Sidewalk Width Priority feet 3.0-4.02.0 Cross Slope (PAR)SF194.6to $120 $2,3401510898ft feet 2.0-3.04.8 Cross Slope (PAR)SF5311.8to $120 $6,3001510908ft feet 2.0-3.016.9 Cross Slope (PAR)SF19743.1to $120 $23,5801510918ft feet 2.0-3.049.6 Cross Slope (PAR)SF14268.5to $120 $17,0101510928ft feet 2.0-3.072.8 Cross Slope (PAR)SF7983.3to $120 $9,4501510938ft feet 2.0-3.089.4 Cross Slope (PAR)SF890.4to $120 $9001510948ft feet 2.0-3.094.7 Cross Slope (PAR)SF296134.1to $120 $35,4601510958ft feet 2.0-3.0139.3 Cross Slope (PAR)SF136157.5to $120 $16,3801510968ft $111,420.00TOTAL COST FOR:CORONA AVEWside of Starting at:E 50TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 616 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CORONA AVE Street Side FRUITLAND AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912171210 Run ID Corona Ave 35 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF374.9to $120 $4,4101510758ft feet -.264.1 Vertical Change REF85.1to136664 8 ft feet 2.0-3.05.3 Cross Slope (PAR)SF28743.5to $120 $34,3801510768ft feet44.4 Cold Patch 3248.7to140439 8 ft feet 2.0-3.056.3 Cross Slope (PAR)SF1958.8to $120 $2,2501510778ft feet 2.0-3.067.8 Cross Slope (PAR)SF18592.5to $120 $22,2301510788ft feet 2.0-3.094.8 Cross Slope (PAR)SF110109.4to $120 $13,1401510798ft $76,410.00TOTAL COST FOR:CORONA AVEEside of Starting at:FRUITLAND AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 617 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CORONA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 50TH ST End Street Name 1912171215 Run ID Corona Ave 47 ID Sidewalk Width Priority feet 2.0-3.00.1 Cross Slope (PAR)SF10313.8to $120 $12,3301510608ft feet 2.0-3.016.0 Cross Slope (PAR)SF1818.4to $120 $2,1601510618ft feet19.0 Cold Patch 2021.6to140438 8 ft feet .4620.6 Vertical Change LF2523.9to $75 $1,8561366568ft feet22.6 Continuous Width SF823.6to $120 $9001667958ft feet 3.0-4.026.8 Cross Slope (PAR)SF3831.9to $120 $4,5901510628ft feet 2.0-3.031.9 Cross Slope (PAR)SF6640.7to $120 $7,9201510638ft feet 3.0-4.043.9 Cross Slope (PAR)SF7954.4to $120 $9,4501510648ft feet .2950.2 Vertical Change REF851.2to136657 8 ft feet 2.0-3.055.4 Cross Slope (PAR)SF12672.2to $120 $15,1201510658ft feet -.4371.2 Vertical Change REF872.2to136658 8 ft feet 4.0-5.075.0 Cross Slope (PAR)SF3079.0to $120 $3,6001510668ft feet 2.0-3.079.3 Cross Slope (PAR)SF7589.3to $120 $9,0001510678ft feet 4.0-5.089.3 Cross Slope (PAR)SF6898.3to $120 $8,1001510688ft feet -.396.1 Vertical Change REF897.1to136659 8 ft feet 3.0-4.0100.8 Cross Slope (PAR)SF11102.3to $120 $1,3501510698ft feet -.29105.8 Vertical Change REF8106.8to136660 8 ft feet 2.0-3.0105.8 Cross Slope (PAR)SF179129.7to $120 $21,5101510708ft feet -.26127.2 Vertical Change REF7128.2to136661 8 ft feet 4.0-5.0131.2 Cross Slope (PAR)SF94143.7to $120 $11,2501510718ft feet .37134.1 Vertical Change REF8135.1to136662 8 ft feet -.55140.7 Vertical Change REF8141.7to136663 8 ft feet 2.0-3.0145.0 Cross Slope (PAR)SF22147.9to $120 $2,6101510728ft feet 4.0-5.0148.6 Cross Slope (PAR)SF13150.3to $120 $1,5301510738ft feet 2.0-3.0150.9 Cross Slope (PAR)SF76161.0to $120 $9,0901510748ft $122,366.25TOTAL COST FOR:CORONA AVEEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 618 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E CORONA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name DISTRICT BLVD End Street Name 1912181317 Run ID Corona Ave 50 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF658.7to $120 $7,8301499628ft feet 5.0-6.08.7 Cross Slope (PAR)SF89.8to $120 $9901499638ft feet 6.0-7.09.8 Cross Slope (PAR)SF1612.0to $120 $1,9801499648ft feet 5.0-6.012.0 Cross Slope (PAR)SF6821.0to $120 $8,1001499658ft feet 3.0-4.022.3 Cross Slope (PAR)SF1524.3to $120 $1,8001499668ft feet 2.0-3.024.3 Cross Slope (PAR)SF4430.2to $120 $5,3101499678ft feet -.2628.4 Vertical Change REF829.4to136363 8 ft feet 2.0-3.037.9 Cross Slope (PAR)SF2641.3to $120 $3,0601499688ft feet 3.0-4.047.2 Cross Slope (PAR)SF3852.3to $120 $4,5901499698ft feet 2.0-3.067.7 Cross Slope (PAR)SF7477.5to $120 $8,8201499708ft feet 2.0-3.087.3 Cross Slope (PAR)SF888.4to $120 $9901499718ft feet93.5 Cold Patch 2696.9to140398 8 ft feet .5196.7 Vertical Change SF897.7to $75 $5631363648ft feet 2.0-3.099.3 Cross Slope (PAR)SF23102.3to $120 $2,7001499728ft feet 3.0-4.0106.7 Cross Slope (PAR)SF22109.6to $120 $2,6101499738ft $49,342.50TOTAL COST FOR:CORONA AVEEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 619 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CORONA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912171207 Run ID Corona Ave 35 ID Sidewalk Width Priority feet 2.0-3.02.4 Cross Slope (PAR)SF144.0to $120 $1,6321510809ft feet 4.0-5.06.4 Cross Slope (PAR)SF4411.6to $120 $5,3041510819ft feet 2.0-3.012.5 Cross Slope (PAR)SF1914.7to $120 $2,2441510829ft feet 2.0-3.021.9 Cross Slope (PAR)SF24150.3to $120 $28,9681510839ft feet 4.0-5.050.5 Cross Slope (PAR)SF3154.1to $120 $3,6721510849ft feet 2.0-3.056.0 Cross Slope (PAR)SF4661.4to $120 $5,5081510859ft feet -.2659.2 Vertical Change REF3263.0to136665 9 ft feet 4.0-5.061.8 Cross Slope (PAR)SF3065.3to $120 $3,5701510869ft feet 2.0-3.065.9 Cross Slope (PAR)SF3570.0to $120 $4,1821510879ft feet 2.0-3.073.1 Cross Slope (PAR)SF16892.9to $120 $20,1961510889ft $75,276.00TOTAL COST FOR:CORONA AVEWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 620 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes W CORONA AVE Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 48TH ST End Street Name 1912181321 Run ID Corona Ave 32 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF618.1to $120 $7,2901499468ft feet 2.0-3.010.2 Cross Slope (PAR)SF9322.6to $120 $11,1601499478ft feet22.6 Driveway45.5to165354 feet 3.0-4.046.4 Cross Slope (Driveway)SF16868.8to $40 $6,7201499488ft feet 2.0-3.068.8 Cross Slope (PAR)SF2772.4to $120 $3,2401499498ft feet 3.0-4.075.9 Cross Slope (PAR)SF4882.3to $120 $5,7601499508ft feet 4.0-5.086.4 Cross Slope (PAR)SF2990.3to $120 $3,5101499518ft $37,680.00TOTAL COST FOR:CORONA AVEWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 621 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side CORONA AVE Survey Street Name Starting Street Name LOMA VISTA AVE End Street Name 1912191128 Run ID District Blvd 79 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF16517.4to $120 $19,83614877310ft feet 2.0-3.024.1 Cross Slope (PAR)SF3227.5to $120 $3,87614877410ft feet 2.0-3.034.8 Cross Slope (PAR)SF7843.0to $120 $9,34814877510ft feet 3.0-4.045.1 Cross Slope (PAR)SF7853.3to $120 $9,34814877610ft feet -.2645.6 Vertical Change REF1046.6to136096 10 ft feet 3.0-4.056.3 Cross Slope (PAR)SF4360.8to $120 $5,13014877710ft feet61.9 Driveway106.8to165269 feet 4.0-5.0106.8 Cross Slope (Driveway)SF13108.2to $40 $53214877810ft feet 2.0-3.0109.7 Cross Slope (PAR)SF29112.8to $120 $3,53414877910ft feet 4.0-5.0112.9 Cross Slope (PAR)SF13114.3to $120 $1,59614878010ft feet114.3 Driveway136.8to165270 feet 3.0-4.0137.6 Cross Slope (PAR)SF105148.7to $120 $12,65414878110ft feet 2.0-3.0149.4 Cross Slope (PAR)SF32152.8to $120 $3,87614878210ft feet 4.0-5.0153.4 Cross Slope (PAR)SF257180.5to $120 $30,89414878310ft feet 3.0-4.0183.1 Cross Slope (PAR)SF22185.4to $120 $2,62214878410ft feet 3.0-4.0195.1 Cross Slope (PAR)SF102205.8to $120 $12,19814878510ft feet 5.0-6.0206.1 Cross Slope (PAR)SF34209.7to $120 $4,10414878610ft feet 3.0-4.0211.3 Cross Slope (PAR)SF23213.7to $120 $2,73614878710ft feet 2.0-3.0216.0 Cross Slope (PAR)SF104226.9to $120 $12,42614878810ft feet .78229.2 Vertical Change SF10230.2to $75 $71313609710ft feet 2.0-3.0230.8 Cross Slope (PAR)SF19232.8to $120 $2,28014878910ft feet 4.0-5.0234.5 Cross Slope (PAR)SF148250.1to $120 $17,78414879010ft feet 2.55247.9 Vertical Change REF10248.9to136098 10 ft feet 2.0-3.0250.1 Cross Slope (PAR)SF71257.6to $120 $8,55014879110ft feet257.6 Driveway306.6to165271 feet 3.0-4.0308.3 Cross Slope (PAR)SF35312.0to $120 $4,21814879210ft feet 2.0-3.0312.0 Cross Slope (PAR)SF22314.3to $120 $2,62214879310ft feet314.8 Driveway362.7to165272 feet 2.0-3.0363.9 Cross Slope (PAR)SF26366.6to $120 $3,07814879410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 622 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side CORONA AVE Survey Street Name Starting Street Name LOMA VISTA AVE End Street Name 1912191128 Run ID District Blvd 79 ID Sidewalk Width Priority feet 3.0-4.0369.2 Cross Slope (PAR)SF54374.9to $120 $6,49814879510ft feet 5.0-6.0375.5 Cross Slope (PAR)SF41379.8to $120 $4,90214879610ft feet 4.0-5.0383.9 Cross Slope (PAR)SF99394.3to $120 $11,85614879710ft feet 2.0-3.0394.3 Cross Slope (PAR)SF99404.7to $120 $11,85614879810ft feet .33399.5 Vertical Change REF10400.5to136099 10 ft feet -.44401.4 Vertical Change REF10402.4to136100 10 ft feet402.1 Protruding Object JOB10403.1to $99 $9916731710ft feet 4.0-5.0405.9 Cross Slope (PAR)SF29408.9to $120 $3,42014879910ft feet 2.0-3.0409.6 Cross Slope (PAR)SF159426.3to $120 $19,03814880010ft feet 4.0-5.0427.7 Cross Slope (PAR)SF48432.7to $120 $5,70014880110ft feet 2.0-3.0433.5 Cross Slope (PAR)SF15435.1to $120 $1,82414880210ft feet 2.0-3.0437.3 Cross Slope (PAR)SF22439.6to $120 $2,62214880310ft feet 4.0-5.0439.6 Cross Slope (PAR)SF24442.1to $120 $2,85014880410ft feet 5.0-6.0444.3 Cross Slope (PAR)SF79452.6to $120 $9,46214880510ft feet .33446.4 Vertical Change REF10447.4to136101 10 ft feet 6.0-7.0454.4 Cross Slope (PAR)SF17456.2to $120 $2,05214880610ft feet 6.0-7.0460.3 Cross Slope (PAR)SF10461.3to $120 $1,14014880710ft feet 5.0-6.0462.3 Cross Slope (PAR)SF26465.0to $120 $3,07814880810ft feet 4.0-5.0467.3 Cross Slope (PAR)SF108478.7to $120 $12,99614880910ft feet 6.0-7.0479.5 Cross Slope (PAR)SF27482.3to $120 $3,19214881010ft feet 5.0-6.0482.3 Cross Slope (PAR)SF11483.5to $120 $1,36814881110ft feet 3.0-4.0484.6 Cross Slope (PAR)SF88493.9to $120 $10,60214881210ft feet 2.0-3.0494.5 Cross Slope (PAR)SF17496.3to $120 $2,05214881310ft feet 2.0-3.0500.2 Cross Slope (PAR)SF25502.8to $120 $2,96414881410ft feet 2.0-3.0505.3 Cross Slope (PAR)SF49510.5to $120 $5,92814881510ft feet 3.0-4.0513.2 Cross Slope (PAR)SF48518.3to $120 $5,81414881610ft feet518.3 Driveway571.3to165273 feet 3.0-4.0572.7 Cross Slope (PAR)SF57578.7to $120 $6,84014881710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 623 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side CORONA AVE Survey Street Name Starting Street Name LOMA VISTA AVE End Street Name 1912191128 Run ID District Blvd 79 ID Sidewalk Width Priority feet 2.0-3.0580.4 Cross Slope (PAR)SF100590.9to $120 $11,97014881810ft feet 2.0-3.0593.7 Cross Slope (PAR)SF69601.0to $120 $8,32214881910ft feet -.31597.5 Vertical Change REF10598.5to136103 10 ft feet 2.0-3.0605.7 Cross Slope (PAR)SF17607.5to $120 $2,05214882010ft feet 2.0-3.0610.1 Cross Slope (PAR)SF214632.6to $120 $25,65014882110ft feet 2.0-3.0636.8 Cross Slope (PAR)SF11638.0to $120 $1,36814882210ft feet 2.0-3.0645.7 Cross Slope (PAR)SF224669.3to $120 $26,90414882310ft feet 2.0-3.0680.3 Cross Slope (PAR)SF179699.1to $120 $21,43214882410ft feet 1.69683.0 Vertical Change REF10684.0to136104 10 ft feet 2.0-3.0720.8 Cross Slope (PAR)SF37724.7to $120 $4,44614882510ft feet 2.0-3.0734.8 Cross Slope (PAR)SF39738.9to $120 $4,67414882610ft feet 2.37735.3 Vertical Change REF10736.3to136105 10 ft feet 2.0-3.0780.6 Cross Slope (PAR)SF11781.8to $120 $1,36814882710ft feet 2.0-3.0789.8 Cross Slope (PAR)SF59796.0to $120 $7,06814882810ft feet801.5 Driveway824.1to165274 feet -.28804.0 Vertical Change REF10805.0to136106 10 ft feet .26812.8 Vertical Change REF10813.8to136107 10 ft feet 4.0-5.0825.3 Cross Slope (PAR)SF62831.8to $120 $7,41014882910ft feet -.26833.0 Vertical Change REF10834.0to136108 10 ft feet 3.0-4.0834.0 Cross Slope (PAR)SF17835.8to $120 $2,05214883010ft feet 2.0-3.0836.7 Cross Slope (PAR)SF131850.5to $120 $15,73214883110ft feet 2.0-3.0855.8 Cross Slope (PAR)SF166873.3to $120 $19,95014883210ft feet 4.0-5.0873.6 Cross Slope (PAR)SF10874.6to $120 $1,14014883310ft feet 6.0-7.0874.8 Cross Slope (PAR)SF30878.0to $120 $3,64814883410ft feet 3.0-4.0879.6 Cross Slope (PAR)SF26882.3to $120 $3,07814883510ft feet 2.0-3.0882.3 Cross Slope (PAR)SF118894.7to $120 $14,13614883610ft feet 4.0-5.0894.7 Cross Slope (PAR)SF112906.5to $120 $13,45214883710ft feet 2.0-3.0906.5 Cross Slope (PAR)SF51911.9to $120 $6,15614883810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 624 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side CORONA AVE Survey Street Name Starting Street Name LOMA VISTA AVE End Street Name 1912191128 Run ID District Blvd 79 ID Sidewalk Width Priority feet 2.0-3.0941.2 Cross Slope (PAR)SF259968.5to $120 $31,12214883910ft feet 4.0-5.0968.8 Cross Slope (PAR)SF76976.8to $120 $9,12014884010ft feet 2.0-3.0978.9 Cross Slope (PAR)SF26981.6to $120 $3,07814884110ft feet -.3997.9 Vertical Change LF10998.9to $75 $71313610910ft feet 3.0-4.01001.6 Cross Slope (PAR)SF261004.3to $120 $3,07814884210ft feet 2.0-3.01004.3 Cross Slope (PAR)SF171006.1to $120 $2,05214884310ft feet 3.0-4.01012.9 Cross Slope (PAR)SF351016.6to $120 $4,21814884410ft feet 2.0-3.01018.5 Cross Slope (PAR)SF261021.2to $120 $3,07814884510ft $570,574.00TOTAL COST FOR:DISTRICT BLVDNside of Starting at:CORONA AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 625 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S / SW DISTRICT BLVD Street Side CORONA AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912190855 Run ID District Blvd 70 ID Sidewalk Width Priority feet 3.0-4.00.8 Cross Slope (PAR)SF121.9to $120 $1,38614937511ft feet2.8 Cold Patch 346.0to140373 11 ft feet .284.2 Vertical Change LF115.2to $75 $78813623311ft feet11.2 Cold Patch 4015.0to140374 11 ft feet 3.0-4.016.9 Cross Slope (PAR)SF14630.8to $120 $17,51414937611ft feet 2.0-3.030.8 Cross Slope (PAR)SF3333.9to $120 $3,90614937711ft feet 4.0-5.034.3 Cross Slope (PAR)SF5739.7to $120 $6,80414937811ft feet 2.0-3.040.6 Cross Slope (PAR)SF1341.8to $120 $1,51214937911ft feet 2.0-3.051.4 Cross Slope (PAR)SF5756.8to $120 $6,80414938011ft feet 3.4953.4 Vertical Change REF1154.4to136234 11 ft feet 3.0-4.059.0 Cross Slope (PAR)SF5063.8to $120 $6,04814938111ft feet 2.0-3.063.8 Cross Slope (PAR)SF1164.8to $120 $1,26014938211ft feet 2.0-3.068.4 Cross Slope (PAR)SF23190.4to $120 $27,72014938311ft feet92.3 Driveway110.2to165314 feet 4.0-5.0110.3 Cross Slope (Driveway)SF82118.1to $40 $3,27614938411ft feet 1.79113.5 Vertical Change REF11114.5to136235 11 ft feet 2.0-3.0118.1 Cross Slope (PAR)SF122129.7to $120 $14,61614938511ft feet 4.0-5.0129.7 Cross Slope (PAR)SF70136.4to $120 $8,44214938611ft feet 2.0-3.0136.4 Cross Slope (PAR)SF12137.5to $120 $1,38614938711ft feet138.1 Driveway161.6to165315 feet 3.12161.9 Vertical Change REF11162.9to136236 11 ft feet 3.0-4.0162.3 Cross Slope (Driveway)SF51167.2to $40 $2,05814938811ft feet 2.0-3.0167.4 Cross Slope (PAR)SF13168.6to $120 $1,51214938911ft feet 2.0-3.0175.3 Cross Slope (PAR)SF37178.8to $120 $4,41014939011ft feet 2.0-3.0187.3 Cross Slope (PAR)SF16188.8to $120 $1,89014939111ft feet -.28189.1 Vertical Change LF11190.1to $75 $78813623711ft feet 4.0-5.0194.6 Cross Slope (PAR)SF34197.8to $120 $4,03214939211ft feet 3.0-4.0201.8 Cross Slope (PAR)SF34205.0to $120 $4,03214939311ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 626 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S / SW DISTRICT BLVD Street Side CORONA AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912190855 Run ID District Blvd 70 ID Sidewalk Width Priority feet 5.0-6.0205.0 Cross Slope (PAR)SF24207.3to $120 $2,89814939411ft feet 6.0-7.0210.3 Cross Slope (PAR)SF16211.8to $120 $1,89014939511ft feet 4.0-5.0213.8 Cross Slope (PAR)SF63219.8to $120 $7,56014939611ft feet 2.0-3.0222.8 Cross Slope (PAR)SF27225.4to $120 $3,27614939711ft feet 4.0-5.0226.0 Cross Slope (PAR)SF23228.2to $120 $2,77214939811ft feet 5.0-6.0230.7 Cross Slope (PAR)SF43234.8to $120 $5,16614939911ft feet 3.0-4.0235.1 Cross Slope (PAR)SF106245.2to $120 $12,72614940011ft feet 2.0-3.0247.1 Cross Slope (PAR)SF21249.1to $120 $2,52014940111ft feet 5.0-6.0251.1 Cross Slope (PAR)SF20253.0to $120 $2,39414940211ft feet 2.0-3.0254.9 Cross Slope (PAR)SF23257.1to $120 $2,77214940311ft feet 2.0-3.0265.2 Cross Slope (PAR)SF83273.1to $120 $9,95414940411ft feet 4.0-5.0277.0 Cross Slope (PAR)SF109287.4to $120 $13,10414940511ft feet287.7 Driveway313.0to165316 feet .71302.7 Vertical Change REF11303.7to136238 11 ft feet 3.0-4.0313.2 Cross Slope (Driveway)SF70319.9to $40 $2,81414940611ft feet 2.0-3.0319.9 Cross Slope (PAR)SF193338.3to $120 $23,18414940711ft feet 4.0-5.0340.1 Cross Slope (PAR)SF29342.9to $120 $3,52814940811ft feet .29343.9 Vertical Change LF11344.9to $75 $78813623911ft feet 5.0-6.0347.4 Cross Slope (PAR)SF20349.3to $120 $2,39414940911ft feet 3.0-4.0350.5 Cross Slope (PAR)SF11351.5to $120 $1,26014941011ft feet 3.0-4.0354.0 Cross Slope (PAR)SF87362.3to $120 $10,45814941111ft feet 2.0-3.0362.3 Cross Slope (PAR)SF194380.8to $120 $23,31014941211ft feet381.4 Driveway409.8to165317 feet381.4 Driveway466.4to165318 feet 3.0-4.0409.8 Cross Slope (Driveway)SF77417.1to $40 $3,06614941311ft feet 5.0-6.0417.1 Cross Slope (Driveway)SF39420.8to $40 $1,55414941411ft feet .42417.4 Vertical Change REF11418.4to136240 11 ft feet 2.0-3.0422.6 Cross Slope (Driveway)SF86430.8to $40 $3,44414941511ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 627 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S / SW DISTRICT BLVD Street Side CORONA AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912190855 Run ID District Blvd 70 ID Sidewalk Width Priority feet 1.01424.8 Vertical Change REF11425.8to136241 11 ft feet 4.0-5.0431.1 Cross Slope (Driveway)SF76438.3to $40 $3,02414941611ft feet 2.0-3.0442.8 Cross Slope (Driveway)SF17444.4to $40 $67214941711ft $266,710.50TOTAL COST FOR:DISTRICT BLVDS / SW side of Starting at:CORONA AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 628 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side E 49TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912190910 Run ID District Blvd 49 ID Sidewalk Width Priority feet 2.0-3.00.1 Cross Slope (PAR)SF414.3to $120 $4,91414931110ft feet 2.0-3.06.4 Cross Slope (PAR)SF137.7to $120 $1,52114931210ft feet 3.159.6 Vertical Change REF1010.6to136220 10 ft feet 2.0-3.010.3 Cross Slope (PAR)SF5115.5to $120 $6,08414931310ft feet29.5 Cold Patch 2031.5to140372 10 ft feet .2731.0 Vertical Change LF1032.0to $75 $73113622110ft feet 2.0-3.032.6 Cross Slope (PAR)SF3536.2to $120 $4,21214931410ft feet -.4435.2 Vertical Change REF1036.2to136222 10 ft feet 2.0-3.042.3 Cross Slope (PAR)SF27070.0to $120 $32,40914931510ft feet70.4 Driveway96.5to165307 feet -.2680.9 Vertical Change REF1081.9to136223 10 ft feet 3.0-4.098.8 Cross Slope (PAR)SF1099.8to $120 $1,17014931610ft feet 3.0-4.0102.3 Cross Slope (PAR)SF11103.4to $120 $1,28714931710ft feet 2.0-3.0110.8 Cross Slope (PAR)SF74118.4to $120 $8,89214931810ft feet 2.0-3.0122.5 Cross Slope (PAR)SF40126.6to $120 $4,79714931910ft feet 2.0-3.0129.4 Cross Slope (PAR)SF293159.5to $120 $35,21714932010ft feet160.3 Driveway185.8to165308 feet160.3 Driveway232.7to165309 feet 2.0-3.0186.8 Cross Slope (Driveway)SF41191.0to $40 $1,63814932110ft feet 4.0-5.0191.0 Cross Slope (Driveway)SF23193.4to $40 $93614932210ft feet 2.0-3.0194.3 Cross Slope (Driveway)SF113205.9to $40 $4,52414932310ft feet 2.0-3.0226.9 Cross Slope (Driveway)SF35230.5to $40 $1,40414932410ft $109,736.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:E 49TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 629 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side E 50TH ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912190918 Run ID District Blvd 78 ID Sidewalk Width Priority feet 3.0-4.00.6 Cross Slope (PAR)SF192.5to $120 $2,22314926910ft feet 3.0-4.06.8 Cross Slope (PAR)SF7014.0to $120 $8,42414927010ft feet12.2 Continuous Width REF1013.2to167803 10 ft feet 2.0-3.014.5 Cross Slope (PAR)SF4018.6to $120 $4,79714927110ft feet 4.0-5.019.5 Cross Slope (PAR)SF8528.2to $120 $10,17914927210ft feet 2.0-3.030.1 Cross Slope (PAR)SF2132.3to $120 $2,57414927310ft feet 4.0-5.032.3 Cross Slope (PAR)SF11744.3to $120 $14,04014927410ft feet 2.0-3.044.4 Cross Slope (PAR)SF4448.9to $120 $5,26514927510ft feet 4.0-5.048.9 Cross Slope (PAR)SF6255.3to $120 $7,48814927610ft feet 2.0-3.058.1 Cross Slope (PAR)SF1159.2to $120 $1,28714927710ft feet 2.0-3.080.5 Cross Slope (PAR)SF2683.2to $120 $3,15914927810ft feet 2.0-3.0111.8 Cross Slope (PAR)SF73119.3to $120 $8,77514927910ft feet 2.0-3.0122.8 Cross Slope (PAR)SF14124.2to $120 $1,63814928010ft feet 4.0-5.0136.5 Cross Slope (PAR)SF11137.6to $120 $1,28714928110ft feet182.3 Driveway211.3to165306 feet .38210.2 Vertical Change REF10211.2to136214 10 ft feet 5.0-6.0212.3 Cross Slope (PAR)SF100222.6to $120 $12,05114928210ft feet .3213.9 Vertical Change REF10214.9to136215 10 ft feet 1.01216.3 Vertical Change REF10217.3to136216 10 ft feet 3.0-4.0222.6 Cross Slope (PAR)SF11223.7to $120 $1,28714928310ft feet 2.0-3.0224.5 Cross Slope (PAR)SF72231.9to $120 $8,65814928410ft feet 3.0-4.0234.3 Cross Slope (PAR)SF63240.8to $120 $7,60514928510ft feet 2.0-3.0240.8 Cross Slope (PAR)SF16242.4to $120 $1,87214928610ft feet 2.0-3.0246.3 Cross Slope (PAR)SF19248.2to $120 $2,22314928710ft $104,832.00TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:E 50TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 630 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side EVERETT AVE Survey Street Name Starting Street Name S MAYWOOD AVE End Street Name 1912181635 Run ID District Blvd 62 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF252.6to $120 $2,96414954710ft feet 2.0-3.03.8 Cross Slope (PAR)SF9513.8to $120 $11,40014954810ft feet 3.0-4.017.7 Cross Slope (PAR)SF5323.3to $120 $6,38414954910ft feet 2.0-3.024.0 Cross Slope (PAR)SF1525.6to $120 $1,82414955010ft feet 2.0-3.035.8 Cross Slope (PAR)SF1036.8to $120 $1,14014955110ft feet 2.0-3.048.6 Cross Slope (PAR)SF6355.2to $120 $7,52414955210ft feet 2.0-3.060.6 Cross Slope (PAR)SF2663.3to $120 $3,07814955310ft feet 2.0-3.0106.3 Cross Slope (PAR)SF81114.8to $120 $9,69014955410ft feet 2.0-3.0137.3 Cross Slope (PAR)SF76145.3to $120 $9,12014955510ft feet 2.0-3.0149.0 Cross Slope (PAR)SF10150.0to $120 $1,14014955610ft feet 2.0-3.0153.7 Cross Slope (PAR)SF28156.6to $120 $3,30614955710ft feet 2.0-3.0162.7 Cross Slope (PAR)SF51168.1to $120 $6,15614955810ft feet 2.0-3.0181.8 Cross Slope (PAR)SF112193.6to $120 $13,45214955910ft feet195.6 Driveway214.5to165328 feet 3.0-4.0214.5 Cross Slope (Driveway)SF45219.2to $40 $1,78614956010ft feet 5.0-6.0219.2 Cross Slope (PAR)SF43223.7to $120 $5,13014956110ft feet 2.0-3.0224.4 Cross Slope (PAR)SF13225.8to $120 $1,59614956210ft feet 3.0-4.0231.3 Cross Slope (PAR)SF35235.0to $120 $4,21814956310ft feet 2.0-3.0235.0 Cross Slope (PAR)SF205256.6to $120 $24,62414956410ft feet -.33236.8 Vertical Change REF10237.8to136261 10 ft feet 4.0-5.0259.6 Cross Slope (PAR)SF40263.8to $120 $4,78814956510ft feet 2.0-3.0263.8 Cross Slope (PAR)SF199284.7to $120 $23,82614956610ft feet 3.0-4.0291.2 Cross Slope (PAR)SF56297.1to $120 $6,72614956710ft feet 2.0-3.0297.1 Cross Slope (PAR)SF14298.6to $120 $1,71014956810ft feet 2.0-3.0301.2 Cross Slope (PAR)SF48306.3to $120 $5,81414956910ft feet 2.0-3.0309.7 Cross Slope (PAR)SF148325.3to $120 $17,78414957010ft feet326.0 Driveway350.1to165329 feet 2.0-3.0357.0 Cross Slope (PAR)SF25359.6to $120 $2,96414957110ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 631 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side EVERETT AVE Survey Street Name Starting Street Name S MAYWOOD AVE End Street Name 1912181635 Run ID District Blvd 62 ID Sidewalk Width Priority feet .33362.1 Vertical Change LF10363.1to $75 $71313626210ft feet 2.0-3.0363.6 Cross Slope (PAR)SF35367.3to $120 $4,21814957210ft feet368.0 Driveway394.4to165330 feet -.3397.0 Vertical Change REF10398.0to136263 10 ft feet 3.0-4.0397.9 Cross Slope (PAR)SF16399.6to $120 $1,93814957310ft feet 2.0-3.0399.8 Cross Slope (PAR)SF21402.0to $120 $2,50814957410ft feet .43403.2 Vertical Change LF10404.2to $75 $71313626410ft feet 2.0-3.0410.3 Cross Slope (PAR)SF13411.7to $120 $1,59614957510ft feet -.29413.1 Vertical Change LF10414.1to $75 $71313626510ft feet 3.0-4.0418.4 Cross Slope (PAR)SF37422.3to $120 $4,44614957610ft feet 2.0-3.0428.2 Cross Slope (PAR)SF67435.3to $120 $8,09414957710ft feet 4.0-5.0436.9 Cross Slope (PAR)SF47441.8to $120 $5,58614957810ft feet 2.0-3.0447.6 Cross Slope (PAR)SF21449.8to $120 $2,50814957910ft feet 5.0-6.0451.2 Cross Slope (PAR)SF39455.3to $120 $4,67414958010ft feet -.29456.2 Vertical Change LF10457.2to $75 $71313626610ft feet 5.0-6.0459.2 Cross Slope (PAR)SF61465.6to $120 $7,29614958110ft feet 3.0-4.0465.8 Cross Slope (PAR)SF42470.2to $120 $5,01614958210ft feet 2.0-3.0473.5 Cross Slope (PAR)SF11474.7to $120 $1,36814958310ft feet .31477.0 Vertical Change LF10478.0to $75 $71313626710ft feet 2.0-3.0483.3 Cross Slope (PAR)SF51488.7to $120 $6,15614958410ft feet 3.0-4.0494.3 Cross Slope (PAR)SF19496.3to $120 $2,28014958510ft feet 4.0-5.0498.7 Cross Slope (PAR)SF13500.1to $120 $1,59614958610ft feet 2.0-3.0502.6 Cross Slope (PAR)SF33506.1to $120 $3,99014958710ft feet 2.0-3.0508.5 Cross Slope (PAR)SF13509.9to $120 $1,59614958810ft feet 2.0-3.0515.6 Cross Slope (PAR)SF10516.7to $120 $1,25414958910ft feet 2.0-3.0518.9 Cross Slope (PAR)SF12520.2to $120 $1,48214959010ft feet 3.0-4.0524.3 Cross Slope (PAR)SF19526.3to $120 $2,28014959110ft feet 2.0-3.0526.6 Cross Slope (PAR)SF10527.7to $120 $1,25414959210ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 632 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side EVERETT AVE Survey Street Name Starting Street Name S MAYWOOD AVE End Street Name 1912181635 Run ID District Blvd 62 ID Sidewalk Width Priority $252,842.50TOTAL COST FOR:DISTRICT BLVDNside of Starting at:EVERETT AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 633 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side EVERETT AVE Survey Street Name Starting Street Name LOMA VISTA AVE End Street Name 1912181615 Run ID District Blvd 59.5 ID Sidewalk Width Priority feet 2.0-3.03.8 Cross Slope (PAR)SF10514.6to $120 $12,63614964210ft feet 3.0523.3 Vertical Change SF1024.3to $75 $73113627810ft feet 2.0-3.033.8 Cross Slope (PAR)SF3837.7to $120 $4,56314964310ft feet 4.0-5.037.7 Cross Slope (PAR)SF5042.8to $120 $5,96714964410ft feet42.8 Cold Patch 3546.4to140377 10 ft feet 3.0-4.046.4 Cross Slope (PAR)SF2749.2to $120 $3,27614964510ft feet 2.0-3.050.1 Cross Slope (PAR)SF1151.2to $120 $1,28714964610ft feet 2.0-3.053.3 Cross Slope (PAR)SF18572.3to $120 $22,23014964710ft feet 2.0-3.074.6 Cross Slope (PAR)SF4879.5to $120 $5,73314964810ft feet 3.0-4.084.3 Cross Slope (PAR)SF1585.8to $120 $1,75514964910ft feet 2.0-3.087.5 Cross Slope (PAR)SF203108.3to $120 $24,33614965010ft feet 2.0-3.0113.4 Cross Slope (PAR)SF198133.7to $120 $23,75114965110ft feet136.4 Cold Patch 43140.8to140378 10 ft feet 3.0-4.0143.3 Cross Slope (PAR)SF15144.8to $120 $1,75514965210ft feet 2.0-3.0144.8 Cross Slope (PAR)SF58150.7to $120 $6,90314965310ft feet151.2 Cold Patch 22153.5to140379 10 ft feet 2.0-3.0163.8 Cross Slope (PAR)SF104174.5to $120 $12,51914965410ft feet 4.0-5.0174.5 Cross Slope (PAR)SF245199.6to $120 $29,36714965510ft feet 2.0-3.0201.9 Cross Slope (PAR)SF253227.8to $120 $30,30314965610ft feet228.4 Driveway274.3to165333 feet 3.0-4.0275.6 Cross Slope (PAR)SF36279.3to $120 $4,32914965710ft feet 5.0-6.0281.2 Cross Slope (PAR)SF40285.3to $120 $4,79714965810ft feet 3.0-4.0285.3 Cross Slope (PAR)SF10286.3to $120 $1,17014965910ft feet 2.0-3.0287.1 Cross Slope (PAR)SF10288.1to $120 $1,17014966010ft feet 2.0-3.0291.1 Cross Slope (PAR)SF41295.3to $120 $4,91414966110ft feet295.3 Driveway330.3to165334 feet 2.0-3.0331.1 Cross Slope (PAR)SF74338.7to $120 $8,89214966210ft feet 3.0-4.0345.2 Cross Slope (PAR)SF37349.0to $120 $4,44614966310ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 634 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side EVERETT AVE Survey Street Name Starting Street Name LOMA VISTA AVE End Street Name 1912181615 Run ID District Blvd 59.5 ID Sidewalk Width Priority feet 3.0-4.0353.3 Cross Slope (PAR)SF91362.6to $120 $10,88114966410ft feet 2.0-3.0362.6 Cross Slope (PAR)SF13363.9to $120 $1,52114966510ft feet 2.0-3.0366.0 Cross Slope (PAR)SF25368.6to $120 $3,04214966610ft feet 4.0-5.0369.3 Cross Slope (PAR)SF27372.1to $120 $3,27614966710ft feet 2.0-3.0373.0 Cross Slope (PAR)SF186392.1to $120 $22,34714966810ft feet 3.0-4.0394.2 Cross Slope (PAR)SF37398.0to $120 $4,44614966910ft feet398.9 Driveway429.7to165335 feet 3.0-4.0429.9 Cross Slope (Driveway)SF198450.2to $40 $7,91714967010ft feet 2.0-3.0451.0 Cross Slope (PAR)SF15452.5to $120 $1,75514967110ft feet 3.0-4.0464.3 Cross Slope (PAR)SF141478.8to $120 $16,96514967210ft feet 2.0-3.0478.8 Cross Slope (PAR)SF12480.0to $120 $1,40414967310ft feet 3.0-4.0483.7 Cross Slope (PAR)SF84492.3to $120 $10,06214967410ft feet 2.0-3.0502.3 Cross Slope (PAR)SF146517.3to $120 $17,55014967510ft feet 2.0-3.0520.6 Cross Slope (PAR)SF23523.0to $120 $2,80814967610ft feet529.9 Driveway558.6to165336 feet .29533.9 Vertical Change REF10534.9to136280 10 ft feet 2.0-3.0564.0 Cross Slope (PAR)SF62570.4to $120 $7,48814967710ft feet 2.0-3.0574.8 Cross Slope (PAR)SF30577.9to $120 $3,62714967810ft feet 2.0-3.0581.4 Cross Slope (PAR)SF38585.3to $120 $4,56314967910ft feet 2.0-3.0587.8 Cross Slope (PAR)SF149603.1to $120 $17,90114968010ft feet 2.0-3.0614.4 Cross Slope (PAR)SF92623.8to $120 $10,99814968110ft feet 2.0-3.0625.9 Cross Slope (PAR)SF15627.4to $120 $1,75514968210ft feet 3.0-4.0630.6 Cross Slope (PAR)SF104641.3to $120 $12,51914968310ft feet643.2 Driveway693.1to165337 feet 2.0-3.0693.1 Cross Slope (Driveway)SF50698.2to $40 $1,98914968410ft feet 1.24718.6 Vertical Change REF10719.6to136281 10 ft feet 3.0-4.0719.4 Cross Slope (PAR)SF34722.9to $120 $4,09514968510ft feet 2.0-3.0726.7 Cross Slope (PAR)SF144741.5to $120 $17,31614968610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 635 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side EVERETT AVE Survey Street Name Starting Street Name LOMA VISTA AVE End Street Name 1912181615 Run ID District Blvd 59.5 ID Sidewalk Width Priority feet .32734.0 Vertical Change REF10735.0to136282 10 ft feet 4.0-5.0741.5 Cross Slope (PAR)SF127754.5to $120 $15,21014968710ft feet 2.0-3.0754.5 Cross Slope (PAR)SF17756.2to $120 $1,98914968810ft feet 2.0-3.0760.9 Cross Slope (PAR)SF37764.7to $120 $4,44614968910ft feet 4.0-5.0764.7 Cross Slope (PAR)SF40768.8to $120 $4,79714969010ft feet 2.0-3.0768.8 Cross Slope (PAR)SF62775.2to $120 $7,48814969110ft feet 4.0-5.0775.2 Cross Slope (PAR)SF26777.9to $120 $3,15914969210ft feet 2.0-3.0777.9 Cross Slope (PAR)SF15779.4to $120 $1,75514969310ft feet 2.0-3.0781.8 Cross Slope (PAR)SF28784.7to $120 $3,39314969410ft feet 2.65782.0 Vertical Change REF10783.0to136283 10 ft feet 3.0-4.0793.0 Cross Slope (PAR)SF139807.3to $120 $16,73114969510ft feet 2.0-3.0808.3 Cross Slope (PAR)SF25810.9to $120 $3,04214969610ft feet 2.0-3.0814.9 Cross Slope (PAR)SF56820.6to $120 $6,66914969710ft $471,734.25TOTAL COST FOR:DISTRICT BLVDSside of Starting at:EVERETT AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 636 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side FRUITLAND AVE Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 1912191033 Run ID District Blvd 67 ID Sidewalk Width Priority feet 4.0-5.01.4 Cross Slope (PAR)SF7719.5to $120 $9,2311490674ft feet13.4 Continuous Width REF414.4to167244 4 ft feet 2.0-3.019.8 Cross Slope (PAR)SF3628.3to $120 $4,3351490684ft feet20.7 Continuous Width REF421.7to167775 4 ft feet .3229.9 Vertical Change REF430.9to136156 4 ft feet 4.0-5.030.1 Cross Slope (PAR)SF6645.7to $120 $7,9561490694ft feet 2.0-3.047.1 Cross Slope (PAR)SF2252.2to $120 $2,6011490704ft feet49.1 Continuous Width REF450.1to167245 4 ft feet .453.5 Vertical Change REF454.5to136157 4 ft feet 4.0-5.053.8 Cross Slope (PAR)SF655.3to $120 $7651490714ft feet 2.0-3.056.7 Cross Slope (PAR)SF658.1to $120 $7141490724ft feet57.3 Continuous Width SF458.3to $120 $5101676214ft feet -.3557.6 Vertical Change REF458.6to136158 4 ft feet58.1 Cold Patch 1160.6to140361 4 ft feet 3.0-4.063.3 Cross Slope (PAR)SF10287.3to $120 $12,2401490734ft feet 4.0-5.090.5 Cross Slope (PAR)SF68106.5to $120 $8,1601490744ft feet95.7 Continuous Width SF496.7to $120 $5101675214ft feet 2.0-3.0107.3 Cross Slope (PAR)SF13110.4to $120 $1,5811490754ft feet 3.0-4.0116.5 Cross Slope (PAR)SF102140.5to $120 $12,2401490764ft feet130.8 Continuous Width SF4131.8to $120 $5101671184ft feet 3.0-4.0145.2 Cross Slope (PAR)SF12148.0to $120 $1,4281490774ft feet 2.0-3.0151.1 Cross Slope (PAR)SF27157.4to $120 $3,2131490784ft feet 4.0-5.0157.4 Cross Slope (PAR)SF20162.0to $120 $2,3461490794ft feet 3.0-4.0164.2 Cross Slope (PAR)SF200211.3to $120 $24,0211490804ft feet181.0 Continuous Width SF4182.0to $120 $5101671194ft feet 3.29211.7 Vertical Change SF4212.7to $75 $3191361594ft feet 2.0-3.0213.6 Cross Slope (PAR)SF43223.6to $120 $5,1001490814ft feet 2.0-3.0225.8 Cross Slope (PAR)SF34233.9to $120 $4,1311490824ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 637 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side FRUITLAND AVE Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 1912191033 Run ID District Blvd 67 ID Sidewalk Width Priority feet 2.0-3.0240.3 Cross Slope (PAR)SF6241.7to $120 $7141490834ft feet 4.0-5.0243.8 Cross Slope (PAR)SF14247.1to $120 $1,6831490844ft feet244.9 Continuous Width SF4245.9to $120 $5101678354ft feet 2.0-3.0250.6 Cross Slope (PAR)SF15254.1to $120 $1,7851490854ft feet 2.0-3.0256.3 Cross Slope (PAR)SF6257.6to $120 $6631490864ft feet 4.0-5.0258.6 Cross Slope (PAR)SF5259.8to $120 $6121490874ft feet 4.0-5.0263.4 Cross Slope (PAR)SF34271.3to $120 $4,0291490884ft feet .42265.8 Vertical Change REF4266.8to136160 4 ft feet 2.0-3.0273.4 Cross Slope (PAR)SF31280.6to $120 $3,6721490894ft feet276.9 Continuous Width REF4277.9to167215 4 ft feet287.1 Cold Patch 433389.0to140362 4 ft feet .27308.8 Vertical Change LF4309.8to $75 $3191361624ft feet -.27330.8 Vertical Change LF4331.8to $75 $3191361634ft feet .36332.7 Vertical Change LF4333.7to $75 $3191361644ft feet .28339.9 Vertical Change LF4340.9to $75 $3191361664ft feet -.29342.8 Vertical Change LF4343.8to $75 $3191361674ft feet .53359.2 Vertical Change SF4360.2to $75 $3191361684ft feet 1.37365.2 Vertical Change SF4366.2to $75 $3191361694ft feet .31372.5 Vertical Change LF4373.5to $75 $3191361704ft feet .29385.0 Vertical Change LF4386.0to $75 $3191361714ft $118,957.50TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:FRUITLAND AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 638 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side GIFFORD AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912190903 Run ID District Blvd 46 ID Sidewalk Width Priority feet 2.0-3.00.6 Cross Slope (PAR)SF131.9to $120 $1,52114934010ft feet 2.0-3.04.4 Cross Slope (PAR)SF267.1to $120 $3,15914934110ft feet 2.0-3.013.8 Cross Slope (PAR)SF1815.6to $120 $2,10614934210ft feet 2.0-3.043.8 Cross Slope (PAR)SF3147.0to $120 $3,74414934310ft feet 4.0-5.047.0 Cross Slope (PAR)SF8155.3to $120 $9,71114934410ft feet 2.0-3.055.6 Cross Slope (PAR)SF1256.8to $120 $1,40414934510ft feet 2.0-3.058.9 Cross Slope (PAR)SF6966.0to $120 $8,30714934610ft feet 2.0-3.071.6 Cross Slope (PAR)SF4576.2to $120 $5,38214934710ft feet .4986.5 Vertical Change REF1087.5to136228 10 ft feet 2.0-3.087.0 Cross Slope (PAR)SF2089.0to $120 $2,34014934810ft feet 2.0-3.099.4 Cross Slope (PAR)SF87108.3to $120 $10,41314934910ft feet 2.0-3.0114.7 Cross Slope (PAR)SF16116.3to $120 $1,87214935010ft feet 2.0-3.0118.5 Cross Slope (PAR)SF45123.1to $120 $5,38214935110ft feet 2.0-3.0130.9 Cross Slope (PAR)SF52136.2to $120 $6,20114935210ft feet .32137.5 Vertical Change LF10138.5to $75 $73113622910ft feet 3.0-4.0140.5 Cross Slope (PAR)SF36144.2to $120 $4,32914935310ft feet 2.0-3.0146.8 Cross Slope (PAR)SF63153.3to $120 $7,60514935410ft feet 3.0-4.0168.8 Cross Slope (PAR)SF27171.6to $120 $3,27614935510ft feet171.6 Driveway201.5to165311 feet171.6 Driveway228.6to165312 feet 3.2175.1 Vertical Change REF10176.1to136230 10 ft feet 4.0-5.0201.5 Cross Slope (Driveway)SF31204.7to $40 $1,24814935610ft feet 2.0-3.0206.1 Cross Slope (Driveway)SF21208.3to $40 $85814935710ft feet 2.0-3.0210.8 Cross Slope (Driveway)SF24213.3to $40 $97514935810ft feet 3.43217.9 Vertical Change REF10218.9to136231 10 ft feet 2.0-3.0219.4 Cross Slope (Driveway)SF84228.0to $40 $3,35414935910ft $83,918.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:GIFFORD AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 639 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side HELIOTROPE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001280948 Run ID District Blvd 41.5 ID Sidewalk Width Priority feet 3.0-4.00.5 Cross Slope (PAR)SF164.5to $120 $1,9201636564ft feet 2.0-3.04.5 Cross Slope (PAR)SF2711.3to $120 $3,2641636574ft feet -.2813.4 Vertical Change LF414.4to $75 $3001399854ft feet 2.0-3.019.6 Cross Slope (PAR)SF5733.8to $120 $6,8161636584ft feet34.8 Driveway93.6to166359 feet .2894.6 Vertical Change LF495.6to $75 $3001399864ft feet 4.0-5.097.8 Cross Slope (PAR)SF17102.1to $120 $2,0641636594ft feet 6.0-7.0104.8 Cross Slope (PAR)SF5106.0to $120 $5761636604ft feet 5.0-6.0106.0 Cross Slope (PAR)SF6107.6to $120 $7681636614ft feet .54109.8 Vertical Change SF4110.8to $75 $3001399874ft feet 2.0-3.0111.1 Cross Slope (PAR)SF18115.7to $120 $2,2081636624ft feet 4.0-5.0115.7 Cross Slope (PAR)SF36124.8to $120 $4,3681636634ft feet124.8 Driveway158.9to166360 feet -.29146.5 Vertical Change REF4147.5to139988 4 ft $22,884.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:HELIOTROPE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 640 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side LOMA VISTA AVE Survey Street Name Starting Street Name EVERETT AVE End Street Name 1912181624 Run ID District Blvd 75 ID Sidewalk Width Priority feet 2.0-3.00.5 Cross Slope (PAR)SF222.8to $120 $2,62214959310ft feet .355.0 Vertical Change LF106.0to $75 $71313626810ft feet 2.0-3.06.3 Cross Slope (PAR)SF4911.5to $120 $5,92814959410ft feet 3.0-4.025.7 Cross Slope (PAR)SF3729.6to $120 $4,44614959510ft feet 2.0-3.029.6 Cross Slope (PAR)SF29660.8to $120 $35,56814959610ft feet 2.0-3.067.3 Cross Slope (PAR)SF18787.0to $120 $22,45814959710ft feet 2.0869.2 Vertical Change REF1070.2to136270 10 ft feet .6285.8 Vertical Change REF1086.8to136271 10 ft feet 4.0-5.087.0 Cross Slope (PAR)SF3891.0to $120 $4,56014959810ft feet 3.3390.4 Vertical Change REF1091.4to136272 10 ft feet 2.0-3.091.0 Cross Slope (PAR)SF3094.2to $120 $3,64814959910ft feet 3.5594.5 Vertical Change SF1095.5to $75 $71313627310ft feet 2.0-3.097.9 Cross Slope (PAR)SF1099.0to $120 $1,25414960010ft feet 2.0-3.0103.1 Cross Slope (PAR)SF29106.2to $120 $3,53414960110ft feet 4.0-5.0107.5 Cross Slope (PAR)SF17109.3to $120 $2,05214960210ft feet 3.0-4.0111.4 Cross Slope (PAR)SF13112.8to $120 $1,59614960310ft feet 2.0-3.0112.8 Cross Slope (PAR)SF12114.1to $120 $1,48214960410ft feet 2.0-3.0121.4 Cross Slope (PAR)SF28124.3to $120 $3,30614960510ft feet 2.0-3.0129.4 Cross Slope (PAR)SF140144.1to $120 $16,75814960610ft feet 3.0-4.0146.4 Cross Slope (PAR)SF18148.3to $120 $2,16614960710ft feet 3.0-4.0150.6 Cross Slope (PAR)SF12151.9to $120 $1,48214960810ft feet 2.0-3.0151.9 Cross Slope (PAR)SF55157.7to $120 $6,61214960910ft feet 3.0-4.0162.0 Cross Slope (PAR)SF84170.8to $120 $10,03214961010ft feet 2.0-3.0170.8 Cross Slope (PAR)SF10171.8to $120 $1,14014961110ft feet176.4 Driveway200.8to165331 feet 2.0-3.0201.8 Cross Slope (PAR)SF17203.6to $120 $2,05214961210ft feet 3.0-4.0209.1 Cross Slope (PAR)SF36212.9to $120 $4,33214961310ft feet 2.0-3.0213.3 Cross Slope (PAR)SF90222.8to $120 $10,83014961410ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 641 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side LOMA VISTA AVE Survey Street Name Starting Street Name EVERETT AVE End Street Name 1912181624 Run ID District Blvd 75 ID Sidewalk Width Priority feet 2.0-3.0230.6 Cross Slope (PAR)SF49235.8to $120 $5,92814961510ft feet 2.0-3.0240.8 Cross Slope (PAR)SF194261.2to $120 $23,25614961610ft feet255.8 Continuous Width SF10256.8to $120 $1,14016729610ft feet 4.0-5.0261.2 Cross Slope (PAR)SF12262.5to $120 $1,48214961710ft feet -.38272.6 Vertical Change LF10273.6to $75 $71313627410ft feet .39300.4 Vertical Change LF10301.4to $75 $71313627510ft feet301.4 Continuous Width SF10302.4to $120 $1,14016729710ft feet 2.0-3.0311.8 Cross Slope (PAR)SF36315.6to $120 $4,33214961810ft feet 3.0-4.0327.2 Cross Slope (PAR)SF13328.6to $120 $1,59614961910ft feet 2.0-3.0329.3 Cross Slope (PAR)SF129342.9to $120 $15,50414962010ft feet 4.0-5.0342.9 Cross Slope (PAR)SF88352.2to $120 $10,60214962110ft feet 2.0-3.0352.3 Cross Slope (PAR)SF60358.6to $120 $7,18214962210ft feet 1.35357.8 Vertical Change REF10358.8to136276 10 ft feet 4.0-5.0358.6 Cross Slope (PAR)SF290389.1to $120 $34,77014962310ft feet 3.0-4.0391.3 Cross Slope (PAR)SF67398.3to $120 $7,98014962410ft feet 2.0-3.0399.2 Cross Slope (PAR)SF53404.8to $120 $6,38414962510ft feet 2.0-3.0407.9 Cross Slope (PAR)SF57413.9to $120 $6,84014962610ft feet 3.0-4.0416.1 Cross Slope (PAR)SF20418.2to $120 $2,39414962710ft feet 2.0-3.0418.2 Cross Slope (PAR)SF74426.0to $120 $8,89214962810ft feet426.8 Driveway447.7to165332 feet 5.0-6.0448.7 Cross Slope (PAR)SF67455.7to $120 $7,98014962910ft feet 3.0-4.0455.7 Cross Slope (PAR)SF17457.5to $120 $2,05214963010ft feet 7.0-8.0459.5 Cross Slope (PAR)SF29462.5to $120 $3,42014963110ft feet 6.0-7.0464.8 Cross Slope (PAR)SF14466.3to $120 $1,71014963210ft feet 5.0-6.0466.3 Cross Slope (PAR)SF29469.3to $120 $3,42014963310ft feet 3.0-4.0469.3 Cross Slope (PAR)SF63475.9to $120 $7,52414963410ft feet 5.0-6.0475.9 Cross Slope (PAR)SF32479.3to $120 $3,87614963510ft feet 3.0-4.0479.3 Cross Slope (PAR)SF57485.3to $120 $6,84014963610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 642 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side LOMA VISTA AVE Survey Street Name Starting Street Name EVERETT AVE End Street Name 1912181624 Run ID District Blvd 75 ID Sidewalk Width Priority feet 5.0-6.0485.3 Cross Slope (PAR)SF47490.2to $120 $5,58614963710ft feet 4.0-5.0494.2 Cross Slope (PAR)SF88503.5to $120 $10,60214963810ft feet 2.0-3.0505.3 Cross Slope (PAR)SF18507.2to $120 $2,16614963910ft feet .36513.1 Vertical Change REF10514.1to136277 10 ft feet 4.0-5.0513.4 Cross Slope (PAR)SF13514.8to $120 $1,59614964010ft feet 5.0-6.0517.3 Cross Slope (PAR)SF89526.7to $120 $10,71614964110ft $357,618.00TOTAL COST FOR:DISTRICT BLVDNside of Starting at:LOMA VISTA AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 643 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side LOMA VISTA AVE Survey Street Name Starting Street Name CORONA AVE End Street Name 1912190848 Run ID District Blvd 74 ID Sidewalk Width Priority feet 2.0-3.03.3 Cross Slope (PAR)SF21124.9to $120 $25,27214941810ft feet 2.0-3.028.8 Cross Slope (PAR)SF9738.8to $120 $11,70014941910ft feet 2.0-3.058.3 Cross Slope (PAR)SF1159.4to $120 $1,28714942010ft feet 3.0-4.078.1 Cross Slope (PAR)SF3081.2to $120 $3,62714942110ft feet 2.0-3.084.0 Cross Slope (PAR)SF183102.8to $120 $21,99614942210ft feet 3.4987.8 Vertical Change REF1088.8to136242 10 ft feet 4.0-5.0102.8 Cross Slope (PAR)SF29105.8to $120 $3,51014942310ft feet 2.0-3.0106.2 Cross Slope (PAR)SF34109.7to $120 $4,09514942410ft feet 4.0-5.0109.7 Cross Slope (PAR)SF140124.1to $120 $16,84814942510ft feet 2.0-3.0125.3 Cross Slope (PAR)SF11126.4to $120 $1,28714942610ft feet132.0 Driveway181.8to165319 feet 2.0-3.0181.8 Cross Slope (Driveway)SF20183.8to $40 $78014942710ft feet 4.0-5.0184.7 Cross Slope (PAR)SF123197.3to $120 $14,74214942810ft feet 3.63192.3 Vertical Change REF10193.3to136243 10 ft feet 3.0-4.0201.3 Cross Slope (PAR)SF29204.3to $120 $3,51014942910ft feet 3.0-4.0210.4 Cross Slope (PAR)SF184229.3to $120 $22,11314943010ft feet 2.0-3.0229.3 Cross Slope (PAR)SF12230.5to $120 $1,40414943110ft feet 4.0-5.0233.6 Cross Slope (PAR)SF18235.4to $120 $2,10614943210ft feet 2.0-3.0236.8 Cross Slope (PAR)SF53242.2to $120 $6,31814943310ft feet 2.0-3.0254.5 Cross Slope (PAR)SF14255.9to $120 $1,63814943410ft feet 4.0-5.0257.7 Cross Slope (PAR)SF53263.1to $120 $6,31814943510ft feet .65259.3 Vertical Change SF10260.3to $75 $73113624510ft feet 2.0-3.0264.1 Cross Slope (PAR)SF36267.8to $120 $4,32914943610ft feet268.5 Cold Patch 33271.9to140375 10 ft feet -.36269.9 Vertical Change LF10270.9to $75 $73113624610ft feet 2.0-3.0271.9 Cross Slope (PAR)SF10272.9to $120 $1,17014943710ft feet 3.0-4.0275.6 Cross Slope (PAR)SF94285.2to $120 $11,23214943810ft feet 3.0-4.0289.7 Cross Slope (PAR)SF12290.9to $120 $1,40414943910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 644 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side LOMA VISTA AVE Survey Street Name Starting Street Name CORONA AVE End Street Name 1912190848 Run ID District Blvd 74 ID Sidewalk Width Priority feet -.31297.0 Vertical Change LF10298.0to $75 $73113624710ft feet 3.0-4.0302.8 Cross Slope (PAR)SF64309.4to $120 $7,72214944010ft feet 2.0-3.0310.1 Cross Slope (PAR)SF53315.5to $120 $6,31814944110ft feet -.33310.4 Vertical Change REF10311.4to136248 10 ft feet 2.0-3.0318.8 Cross Slope (PAR)SF47323.6to $120 $5,61614944210ft feet 3.0-4.0326.4 Cross Slope (PAR)SF78334.4to $120 $9,36014944310ft feet 3.0-4.0337.0 Cross Slope (PAR)SF34340.5to $120 $4,09514944410ft feet 2.0-3.0341.8 Cross Slope (PAR)SF18343.6to $120 $2,10614944510ft feet 2.0-3.0348.3 Cross Slope (PAR)SF159364.6to $120 $19,07114944610ft feet 4.0-5.0374.7 Cross Slope (PAR)SF17376.4to $120 $1,98914944710ft feet 3.0-4.0378.9 Cross Slope (PAR)SF29381.9to $120 $3,51014944810ft feet 2.0-3.0385.8 Cross Slope (PAR)SF15387.3to $120 $1,75514944910ft feet 3.0-4.0389.8 Cross Slope (PAR)SF14391.2to $120 $1,63814945010ft feet 2.0-3.0391.8 Cross Slope (PAR)SF54397.3to $120 $6,43514945110ft feet 2.0-3.0399.4 Cross Slope (PAR)SF16401.0to $120 $1,87214945210ft feet 2.0-3.0403.5 Cross Slope (PAR)SF137417.6to $120 $16,49714945310ft feet419.0 Driveway447.8to165320 feet 4.0-5.0448.3 Cross Slope (Driveway)SF34451.8to $40 $1,36514945410ft feet 2.0-3.0452.3 Cross Slope (PAR)SF142466.9to $120 $17,08214945510ft feet 4.0-5.0466.9 Cross Slope (PAR)SF31470.1to $120 $3,74414945610ft feet 2.0-3.0471.5 Cross Slope (PAR)SF61477.8to $120 $7,37114945710ft feet 3.0-4.0483.5 Cross Slope (PAR)SF13484.8to $120 $1,52114945810ft feet 2.0-3.0484.8 Cross Slope (PAR)SF98494.8to $120 $11,70014945910ft feet494.8 Driveway521.6to165321 feet .48520.1 Vertical Change REF10521.1to136249 10 ft feet 3.0-4.0522.4 Cross Slope (Driveway)SF37526.2to $40 $1,48214946010ft feet 2.0-3.0529.8 Cross Slope (PAR)SF15531.3to $120 $1,75514946110ft feet 2.0-3.0540.3 Cross Slope (PAR)SF71547.6to $120 $8,54114946210ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 645 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side LOMA VISTA AVE Survey Street Name Starting Street Name CORONA AVE End Street Name 1912190848 Run ID District Blvd 74 ID Sidewalk Width Priority feet552.4 Driveway584.5to165322 feet 3.0-4.0586.4 Cross Slope (PAR)SF93595.9to $120 $11,11514946310ft feet 3.0-4.0600.2 Cross Slope (PAR)SF56605.9to $120 $6,66914946410ft feet .28602.6 Vertical Change LF10603.6to $75 $73113625010ft feet 2.0-3.0607.5 Cross Slope (PAR)SF15609.0to $120 $1,75514946510ft feet 2.0-3.0611.3 Cross Slope (PAR)SF131624.7to $120 $15,67814946610ft feet 2.0-3.0627.9 Cross Slope (PAR)SF15629.4to $120 $1,75514946710ft feet 2.0-3.0633.1 Cross Slope (PAR)SF75640.8to $120 $9,00914946810ft feet 3.0-4.0648.1 Cross Slope (PAR)SF27650.9to $120 $3,27614946910ft feet 5.0-6.0650.9 Cross Slope (PAR)SF22653.2to $120 $2,69114947010ft feet 3.0-4.0653.2 Cross Slope (PAR)SF69660.3to $120 $8,30714947110ft feet 2.0-3.0660.3 Cross Slope (PAR)SF12661.5to $120 $1,40414947210ft feet 2.0-3.0664.1 Cross Slope (PAR)SF14665.5to $120 $1,63814947310ft feet 2.0-3.0682.1 Cross Slope (PAR)SF83690.6to $120 $9,94514947410ft feet 2.0-3.0692.7 Cross Slope (PAR)SF33696.1to $120 $3,97814947510ft feet 2.0-3.0698.9 Cross Slope (PAR)SF129712.1to $120 $15,44414947610ft feet 2.0-3.0715.9 Cross Slope (PAR)SF14717.3to $120 $1,63814947710ft feet 3.0-4.0727.9 Cross Slope (PAR)SF16729.5to $120 $1,87214947810ft feet 2.0-3.0734.2 Cross Slope (PAR)SF113745.8to $120 $13,57214947910ft feet 2.0-3.0748.1 Cross Slope (PAR)SF78756.1to $120 $9,36014948010ft feet 3.0-4.0758.3 Cross Slope (PAR)SF59764.4to $120 $7,13714948110ft feet 2.0-3.0764.4 Cross Slope (PAR)SF28767.3to $120 $3,39314948210ft feet 4.0-5.0767.3 Cross Slope (PAR)SF30770.4to $120 $3,62714948310ft feet 2.0-3.0770.9 Cross Slope (PAR)SF12772.1to $120 $1,40414948410ft feet 2.0-3.0774.7 Cross Slope (PAR)SF154790.5to $120 $18,48614948510ft feet 2.0-3.0797.4 Cross Slope (PAR)SF98807.4to $120 $11,70014948610ft feet 3.0-4.0815.3 Cross Slope (PAR)SF32818.6to $120 $3,86114948710ft feet 2.0-3.0818.6 Cross Slope (PAR)SF24821.1to $120 $2,92514948810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 646 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side LOMA VISTA AVE Survey Street Name Starting Street Name CORONA AVE End Street Name 1912190848 Run ID District Blvd 74 ID Sidewalk Width Priority feet 2.0-3.0823.3 Cross Slope (PAR)SF78831.3to $120 $9,36014948910ft feet832.9 Cold Patch 46837.6to140376 10 ft feet 3.0-4.0838.7 Cross Slope (PAR)SF24841.2to $120 $2,92514949010ft feet 2.0-3.0843.7 Cross Slope (PAR)SF17845.4to $120 $1,98914949110ft feet 2.0-3.0848.2 Cross Slope (PAR)SF24850.7to $120 $2,92514949210ft feet 2.0-3.0861.1 Cross Slope (PAR)SF98871.2to $120 $11,81714949310ft feet 2.0-3.0877.2 Cross Slope (PAR)SF53882.6to $120 $6,31814949410ft feet 2.0-3.0886.9 Cross Slope (PAR)SF101897.3to $120 $12,16814949510ft feet 2.21895.3 Vertical Change REF10896.3to136251 10 ft feet 5.0-6.0898.0 Cross Slope (PAR)SF85906.7to $120 $10,17914949610ft feet 2.0-3.0907.3 Cross Slope (PAR)SF106918.2to $120 $12,75314949710ft feet 4.0-5.0918.8 Cross Slope (PAR)SF48923.7to $120 $5,73314949810ft feet 2.0-3.0924.6 Cross Slope (PAR)SF41928.8to $120 $4,91414949910ft $564,876.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:LOMA VISTA AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 647 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191045 Run ID District Blvd 83.5 ID Sidewalk Width Priority feet 2.0-3.00.9 Cross Slope (PAR)SF458.1to $120 $5,4001490186ft feet 4.0-5.08.6 Cross Slope (PAR)SF20942.0to $120 $25,0501490196ft feet 2.0-3.042.0 Cross Slope (PAR)SF2445.8to $120 $2,8501490206ft feet 4.0-5.045.8 Cross Slope (PAR)SF2449.6to $120 $2,8501490216ft feet 2.0-3.049.6 Cross Slope (PAR)SF850.9to $120 $9751490226ft feet 2.0-3.054.1 Cross Slope (PAR)SF655.1to $120 $7501490236ft feet 3.0-4.058.8 Cross Slope (PAR)SF1661.4to $120 $1,9501490246ft feet 2.0-3.061.4 Cross Slope (PAR)SF6071.0to $120 $7,2001490256ft feet 3.0-4.082.8 Cross Slope (PAR)SF984.2to $120 $1,0501490266ft feet 3.0-4.088.7 Cross Slope (PAR)SF1991.8to $120 $2,3251490276ft feet 2.0-3.091.8 Cross Slope (PAR)SF3296.9to $120 $3,8251490286ft feet 4.0-5.097.5 Cross Slope (PAR)SF25101.5to $120 $3,0001490296ft feet 2.0-3.0102.3 Cross Slope (PAR)SF47109.8to $120 $5,6251490306ft feet 5.0-6.0112.5 Cross Slope (PAR)SF16115.1to $120 $1,9501490316ft feet115.3 Protruding Object JOB6116.3to $99 $991673126ft feet 3.0-4.0116.7 Cross Slope (PAR)SF35122.3to $120 $4,2001490326ft feet 2.0-3.0122.3 Cross Slope (PAR)SF55131.1to $120 $6,6001490336ft feet 3.0-4.0137.6 Cross Slope (PAR)SF13139.6to $120 $1,5001490346ft feet140.7 Driveway176.3to165291 feet 3.0-4.0176.4 Cross Slope (Driveway)SF13178.4to $40 $5001490356ft feet 2.0-3.0179.3 Cross Slope (PAR)SF8180.6to $120 $9751490366ft feet 3.0-4.0187.8 Cross Slope (PAR)SF25191.8to $120 $3,0001490376ft feet 2.0-3.0191.9 Cross Slope (PAR)SF11193.7to $120 $1,3501490386ft feet 2.0-3.0198.8 Cross Slope (PAR)SF154223.5to $120 $18,5251490396ft feet 2.0-3.0227.0 Cross Slope (PAR)SF18229.9to $120 $2,1751490406ft feet 2.0-3.0233.7 Cross Slope (PAR)SF66244.2to $120 $7,8751490416ft feet 2.0-3.0247.3 Cross Slope (PAR)SF33252.6to $120 $3,9751490426ft feet 2.0-3.0259.3 Cross Slope (PAR)SF80272.1to $120 $9,6001490436ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 648 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191045 Run ID District Blvd 83.5 ID Sidewalk Width Priority feet 2.0-3.0279.4 Cross Slope (PAR)SF12281.3to $120 $1,4251490446ft feet 2.0-3.0286.8 Cross Slope (PAR)SF6287.8to $120 $7501490456ft feet 3.0-4.0292.9 Cross Slope (PAR)SF8294.2to $120 $9751490466ft feet 2.0-3.0294.4 Cross Slope (PAR)SF21297.8to $120 $2,5501490476ft feet 2.0-3.0307.8 Cross Slope (PAR)SF61317.6to $120 $7,3501490486ft feet 2.0-3.0320.8 Cross Slope (PAR)SF143343.6to $120 $17,1001490496ft feet 2.0-3.0345.7 Cross Slope (PAR)SF135367.3to $120 $16,2001490506ft feet -.51357.9 Vertical Change REF6358.9to136146 6 ft feet 3.0-4.0371.3 Cross Slope (PAR)SF19374.3to $120 $2,2501490516ft feet -.34374.5 Vertical Change LF6375.5to $75 $4691361476ft feet 2.0-3.0379.3 Cross Slope (PAR)SF50387.3to $120 $6,0001490526ft feet 4.0-5.0387.3 Cross Slope (PAR)SF30392.1to $120 $3,6001490536ft feet 2.0-3.0392.1 Cross Slope (PAR)SF7393.2to $120 $8251490546ft feet 3.0-4.0399.3 Cross Slope (PAR)SF22402.8to $120 $2,6251490556ft feet 4.0-5.0404.9 Cross Slope (PAR)SF105421.7to $120 $12,6001490566ft feet 2.0-3.0421.7 Cross Slope (PAR)SF10423.3to $120 $1,2001490576ft feet -.5427.0 Vertical Change REF6428.0to136148 6 ft feet 2.0-3.0427.9 Cross Slope (PAR)SF40434.3to $120 $4,8001490586ft feet -.35432.6 Vertical Change REF6433.6to136149 6 ft feet 2.0-3.0436.8 Cross Slope (PAR)SF139459.0to $120 $16,6501490596ft feet459.3 Driveway503.3to165292 feet .32481.2 Vertical Change REF6482.2to136150 6 ft feet -.41487.5 Vertical Change REF6488.5to136151 6 ft feet 3.0-4.0503.8 Cross Slope (PAR)SF13505.9to $120 $1,5751490606ft feet 2.0-3.0506.3 Cross Slope (PAR)SF9507.8to $120 $1,1251490616ft feet .91510.1 Vertical Change SF6511.1to $75 $4691361526ft feet 3.0-4.0519.1 Cross Slope (PAR)SF22522.6to $120 $2,6251490626ft feet .37519.8 Vertical Change REF6520.8to136153 6 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 649 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191045 Run ID District Blvd 83.5 ID Sidewalk Width Priority feet 2.0-3.0523.0 Cross Slope (PAR)SF41529.6to $120 $4,9501490636ft feet .79532.0 Vertical Change SF6533.0to $75 $4691361546ft feet 2.0-3.0533.1 Cross Slope (PAR)SF25537.1to $120 $3,0001490646ft feet 2.0-3.0541.5 Cross Slope (PAR)SF118560.4to $120 $14,1751490656ft feet 3.09567.7 Vertical Change SF6568.7to $75 $4691361556ft feet 2.0-3.0573.8 Cross Slope (PAR)SF13575.8to $120 $1,5001490666ft $252,899.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:S ATLANTIC BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 650 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001281111 Run ID District Blvd 64 ID Sidewalk Width Priority feet 2.0-3.01.0 Cross Slope (PAR)SF547.8to $120 $6,5281642778ft feet 2.0-3.014.3 Cross Slope (PAR)SF20539.9to $120 $24,5761642788ft feet .3138.6 Vertical Change REF839.6to140175 8 ft feet 2.0-3.053.2 Cross Slope (PAR)SF3457.4to $120 $4,0321642798ft feet 2.0-3.061.3 Cross Slope (PAR)SF1463.0to $120 $1,6321642808ft feet 2.0-3.075.8 Cross Slope (PAR)SF5482.5to $120 $6,4321642818ft feet 2.0-3.086.6 Cross Slope (PAR)SF4892.6to $120 $5,7601642828ft feet 2.0-3.095.9 Cross Slope (PAR)SF2999.5to $120 $3,4561642838ft feet 2.0-3.0105.4 Cross Slope (PAR)SF18107.6to $120 $2,1121642848ft feet 2.0-3.0117.3 Cross Slope (PAR)SF52123.8to $120 $6,2401642858ft feet -.26141.8 Vertical Change REF8142.8to140176 8 ft feet 2.0-3.0142.3 Cross Slope (PAR)SF46148.0to $120 $5,4721642868ft feet 2.0-3.0163.3 Cross Slope (PAR)SF28166.8to $120 $3,3601642878ft feet 4.0-5.0168.6 Cross Slope (PAR)SF50174.8to $120 $5,9521642888ft feet 2.0-3.0174.9 Cross Slope (PAR)SF11176.3to $120 $1,3441642898ft feet179.0 Driveway221.4to166394 feet .27179.9 Vertical Change REF8180.9to140177 8 ft feet 2.0-3.0227.1 Cross Slope (PAR)SF152246.1to $120 $18,2401642908ft feet 2.0-3.0248.3 Cross Slope (PAR)SF74257.5to $120 $8,8321642918ft feet 2.0-3.0261.4 Cross Slope (PAR)SF22264.2to $120 $2,6881642928ft feet .29269.0 Vertical Change LF8270.0to $75 $6001401788ft feet 2.0-3.0270.3 Cross Slope (PAR)SF30274.1to $120 $3,6481642938ft feet 2.0-3.0276.4 Cross Slope (PAR)SF193300.5to $120 $23,1361642948ft feet300.5 Driveway343.5to166395 feet .37324.1 Vertical Change REF8325.1to140179 8 ft feet 3.0-4.0344.7 Cross Slope (PAR)SF49350.8to $120 $5,8561642958ft feet 2.0-3.0350.8 Cross Slope (PAR)SF305388.9to $120 $36,5761642968ft feet 2.0-3.0393.5 Cross Slope (PAR)SF22396.3to $120 $2,6881642978ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 651 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001281111 Run ID District Blvd 64 ID Sidewalk Width Priority feet 2.0-3.0400.7 Cross Slope (PAR)SF143418.6to $120 $17,1841642988ft feet 2.0-3.0422.8 Cross Slope (PAR)SF21425.4to $120 $2,4961642998ft feet 2.0-3.0428.4 Cross Slope (PAR)SF15430.3to $120 $1,8241643008ft feet 2.0-3.0462.3 Cross Slope (PAR)SF18464.6to $120 $2,2081643018ft feet 4.0-5.0465.5 Cross Slope (PAR)SF54472.3to $120 $6,5281643028ft feet .29465.7 Vertical Change REF8466.7to140180 8 ft feet 2.0-3.0472.5 Cross Slope (PAR)SF20475.0to $120 $2,4001643038ft feet 2.0-3.0484.4 Cross Slope (PAR)SF27487.8to $120 $3,2641643048ft feet -.3485.1 Vertical Change REF8486.1to140181 8 ft feet490.7 Driveway545.3to166396 feet .28515.1 Vertical Change REF8516.1to140182 8 ft feet 2.0-3.0554.0 Cross Slope (PAR)SF18556.3to $120 $2,2081643058ft feet 2.0-3.0559.8 Cross Slope (PAR)SF54566.5to $120 $6,4321643068ft feet 3.0-4.0568.9 Cross Slope (PAR)SF10570.1to $120 $1,1521643078ft feet 2.0-3.0570.1 Cross Slope (PAR)SF13571.7to $120 $1,5361643088ft feet .36571.0 Vertical Change REF8572.0to140184 8 ft feet 2.0-3.0574.1 Cross Slope (PAR)SF85584.7to $120 $10,1761643098ft feet 2.0-3.0588.3 Cross Slope (PAR)SF62596.0to $120 $7,3921643108ft feet .42591.4 Vertical Change REF8592.4to140185 8 ft feet 2.0-3.0603.1 Cross Slope (PAR)SF124618.6to $120 $14,8801643118ft feet 2.0-3.0621.6 Cross Slope (PAR)SF125637.2to $120 $14,9761643128ft feet 2.0-3.0646.3 Cross Slope (PAR)SF83656.7to $120 $9,9841643138ft feet 2.0-3.0673.9 Cross Slope (PAR)SF34678.1to $120 $4,0321643148ft feet 2.0-3.0686.2 Cross Slope (PAR)SF49692.3to $120 $5,8561643158ft feet 2.0-3.0694.6 Cross Slope (PAR)SF58701.8to $120 $6,9121643168ft feet 2.0-3.0706.6 Cross Slope (PAR)SF31710.5to $120 $3,7441643178ft feet 2.0-3.0712.8 Cross Slope (PAR)SF159732.7to $120 $19,1041643188ft feet 2.0-3.0735.1 Cross Slope (PAR)SF46740.8to $120 $5,4721643198ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 652 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S ATLANTIC BLVD Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001281111 Run ID District Blvd 64 ID Sidewalk Width Priority feet 2.0-3.0763.0 Cross Slope (PAR)SF28766.5to $120 $3,3601643208ft feet 2.0-3.0769.3 Cross Slope (PAR)SF38774.1to $120 $4,6081643218ft feet779.1 Driveway828.3to166397 feet 2.0-3.0828.5 Cross Slope (Driveway)SF14830.3to $40 $5761643228ft feet .35835.9 Vertical Change LF8836.9to $75 $6001401868ft feet .26848.9 Vertical Change LF8849.9to $75 $6001401878ft feet856.3 Driveway912.8to166398 feet -.27894.9 Vertical Change REF8895.9to140188 8 ft feet 2.0-3.0922.1 Cross Slope (PAR)SF30925.9to $120 $3,6481643238ft feet 2.0-3.0933.3 Cross Slope (PAR)SF34937.6to $120 $4,1281643248ft feet 2.0-3.0941.0 Cross Slope (PAR)SF66949.3to $120 $7,9681643258ft feet -.31941.8 Vertical Change REF8942.8to140189 8 ft feet 2.0-3.0957.4 Cross Slope (PAR)SF27960.8to $120 $3,2641643268ft feet 2.0-3.0980.8 Cross Slope (PAR)SF62988.6to $120 $7,4881643278ft feet 2.0-3.0992.3 Cross Slope (PAR)SF32996.3to $120 $3,8401643288ft feet 2.0-3.0999.8 Cross Slope (PAR)SF681008.3to $120 $8,1601643298ft feet 2.0-3.01014.1 Cross Slope (PAR)SF101015.4to $120 $1,2481643308ft feet 2.0-3.01025.9 Cross Slope (PAR)SF1351042.8to $120 $16,2241643318ft feet 2.0-3.01052.6 Cross Slope (PAR)SF431058.0to $120 $5,1841643328ft feet 2.0-3.01061.5 Cross Slope (PAR)SF751070.9to $120 $9,0241643338ft feet 2.0-3.01073.0 Cross Slope (PAR)SF131074.6to $120 $1,5361643348ft feet 2.0-3.01076.9 Cross Slope (PAR)SF821087.2to $120 $9,8881643358ft feet 2.0-3.01091.0 Cross Slope (PAR)SF241094.0to $120 $2,8801643368ft feet 2.0-3.01097.8 Cross Slope (PAR)SF141099.5to $120 $1,6321643378ft feet 2.0-3.01108.8 Cross Slope (PAR)SF81109.8to $120 $9601643388ft feet 2.0-3.01120.3 Cross Slope (PAR)SF421125.6to $120 $5,0881643398ft $430,824.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:S ATLANTIC BLVD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 653 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S DOWNEY RD Survey Street Name Starting Street Name SIDEWALK CONSTRUCTION End Street Name 1912181548 Run ID District Blvd 110.75 ID Sidewalk Width Priority feet 6.0-7.00.1 Running Slope SF101.9to $120 $1,1881664716ft feet3.6 Continuous Width SF54.6to $120 $6601676236ft feet 5.0-6.09.7 Running Slope SF1412.2to $120 $1,6501664726ft feet12.0 Continuous Width SF613.0to $120 $6601678496ft feet 4.0-5.016.8 Cross Slope (PAR)SF4725.3to $120 $5,6101497566ft feet 2.0-3.025.3 Cross Slope (PAR)SF826.8to $120 $9901497576ft feet .3925.9 Vertical Change REF626.9to136300 6 ft feet 3.0-4.030.4 Cross Slope (PAR)SF4338.3to $120 $5,2141497586ft feet39.2 Cold Patch 1742.3to140381 6 ft feet 2.9140.8 Vertical Change SF641.8to $75 $4131363016ft feet 3.0-4.043.2 Cross Slope (PAR)SF644.3to $120 $7261497596ft feet 2.0-3.045.9 Cross Slope (PAR)SF1949.3to $120 $2,2441497606ft feet 2.0-3.052.7 Cross Slope (PAR)SF954.3to $120 $1,0561497616ft feet .2756.3 Vertical Change LF657.3to $75 $4131363026ft feet -.6361.5 Vertical Change SF662.5to $75 $4131363036ft feet 2.0-3.063.8 Cross Slope (PAR)SF3770.6to $120 $4,4881497626ft feet 2.0-3.074.8 Cross Slope (PAR)SF1377.1to $120 $1,5181497636ft feet .5775.1 Vertical Change REF676.1to136304 6 ft feet 3.0-4.079.7 Cross Slope (PAR)SF680.7to $120 $6601497646ft feet .3382.1 Vertical Change LF683.1to $75 $4131363056ft feet82.3 Cold Patch 1184.3to140382 6 ft feet 2.0-3.089.9 Cross Slope (PAR)SF690.9to $120 $6601497656ft feet100.0 Cold Patch 20103.6to140383 6 ft feet 2.67101.9 Vertical Change SF6102.9to $75 $4131363066ft feet 4.0-5.0107.6 Cross Slope (PAR)SF6108.6to $120 $6601497666ft feet 3.0-4.0114.3 Cross Slope (PAR)SF14116.9to $120 $1,7161497676ft feet118.6 Cold Patch 18121.8to140384 6 ft feet -.34119.3 Vertical Change LF6120.3to $75 $4131363076ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 654 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S DOWNEY RD Survey Street Name Starting Street Name SIDEWALK CONSTRUCTION End Street Name 1912181548 Run ID District Blvd 110.75 ID Sidewalk Width Priority feet125.1 Cold Patch 17128.1to140385 6 ft feet 5.0-6.0132.7 Cross Slope (PAR)SF6133.8to $120 $7261497686ft feet .34138.5 Vertical Change LF6139.5to $75 $4131363086ft feet139.3 Cold Patch 23143.4to140253 6 ft feet -.88141.6 Vertical Change SF6142.6to $75 $4131363096ft feet .26143.5 Vertical Change LF6144.5to $75 $4131363106ft feet -.29147.7 Vertical Change LF6148.7to $75 $4131363116ft feet 2.0-3.0152.9 Cross Slope (PAR)SF11154.9to $120 $1,3201497696ft feet 2.0-3.0158.2 Cross Slope (PAR)SF76172.0to $120 $9,1081497706ft feet 3.0-4.0174.6 Cross Slope (PAR)SF10176.4to $120 $1,1881497716ft feet 2.0-3.0177.1 Cross Slope (PAR)SF10178.9to $120 $1,1881497726ft feet 2.0-3.0182.9 Cross Slope (PAR)SF53192.5to $120 $6,3361497736ft feet 2.0-3.0195.3 Cross Slope (PAR)SF34201.5to $120 $4,0921497746ft feet -.27202.1 Vertical Change LF6203.1to $75 $4131363126ft feet 3.0-4.0205.9 Cross Slope (PAR)SF14208.4to $120 $1,6501497756ft feet .35209.8 Vertical Change LF6210.8to $75 $4131363136ft feet .73226.3 Vertical Change SF16229.2to $75 $1,1961363146ft feet228.6 Driveway282.9to165339 feet -.3237.3 Vertical Change REF6238.3to136315 6 ft feet .26267.6 Vertical Change REF6268.6to136316 6 ft feet 4.0-5.0283.6 Cross Slope (PAR)SF19287.1to $120 $2,3101497766ft feet 2.0-3.0288.1 Cross Slope (PAR)SF7289.4to $120 $8581497776ft feet 4.0-5.0293.8 Cross Slope (PAR)SF7295.1to $120 $8581497786ft feet 2.0-3.0297.2 Cross Slope (PAR)SF61308.3to $120 $7,3261497796ft feet 4.0-5.0311.4 Cross Slope (PAR)SF21315.3to $120 $2,5741497806ft feet 2.0-3.0320.6 Cross Slope (PAR)SF52330.1to $120 $6,2701497816ft feet 4.0-5.0334.2 Cross Slope (PAR)SF9335.8to $120 $1,0561497826ft feet 3.0-4.0338.9 Cross Slope (PAR)SF10340.8to $120 $1,2541497836ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 655 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S DOWNEY RD Survey Street Name Starting Street Name SIDEWALK CONSTRUCTION End Street Name 1912181548 Run ID District Blvd 110.75 ID Sidewalk Width Priority feet 2.0-3.0340.8 Cross Slope (PAR)SF42348.4to $120 $5,0161497846ft feet348.4 Cold Patch 19351.9to140386 6 ft feet .47350.5 Vertical Change LF6351.5to $75 $4131363186ft feet 4.0-5.0351.9 Cross Slope (PAR)SF31357.5to $120 $3,6961497856ft feet .31357.2 Vertical Change REF6358.2to136319 6 ft feet -.65363.5 Vertical Change SF6364.5to $75 $4131363206ft feet .29366.6 Vertical Change LF6367.6to $75 $4131363216ft feet 2.0-3.0373.7 Cross Slope (PAR)SF8375.1to $120 $9241497866ft feet 3.0-4.0377.3 Cross Slope (PAR)SF6378.3to $120 $6601497876ft feet 2.0-3.0378.3 Cross Slope (PAR)SF11380.3to $120 $1,3201497886ft feet 2.0-3.0383.0 Cross Slope (PAR)SF30388.5to $120 $3,6301497896ft feet 2.0-3.0393.4 Cross Slope (PAR)SF12395.5to $120 $1,3861497906ft feet395.6 Driveway439.0to165340 feet -.42402.3 Vertical Change REF6403.3to136322 6 ft feet -.4420.8 Vertical Change REF6421.8to136324 6 ft feet .6426.2 Vertical Change REF6427.2to136325 6 ft feet .38439.4 Vertical Change REF20443.0to136326 6 ft feet 9.0-10.0439.5 Cross Slope (PAR)SF6440.5to $120 $6601497916ft feet440.5 Cold Patch 18443.8to140387 6 ft feet 2.0-3.0445.7 Cross Slope (PAR)SF12447.8to $120 $1,3861497926ft feet .67450.0 Vertical Change SF6451.0to $75 $4131363276ft feet 2.0-3.0461.8 Cross Slope (PAR)SF6462.8to $120 $6601497936ft feet463.8 Cold Patch 23467.9to140388 6 ft feet463.8 Cold Patch 88479.8to140389 6 ft feet 5.0-6.0467.9 Cross Slope (PAR)SF28473.0to $120 $3,3661497946ft $108,314.25TOTAL COST FOR:DISTRICT BLVDSside of Starting at:S DOWNEY RD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 656 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side S MAYWOOD AVE Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912181641 Run ID District Blvd 87.25 ID Sidewalk Width Priority feet 3.0-4.01.6 Cross Slope (PAR)SF597.8to $120 $7,06814950010ft feet 2.0-3.08.0 Cross Slope (PAR)SF9317.8to $120 $11,17214950110ft feet 4.0-5.018.6 Cross Slope (PAR)SF15434.8to $120 $18,46814950210ft feet 2.0-3.036.5 Cross Slope (PAR)SF6743.6to $120 $8,09414950310ft feet 2.0-3.050.3 Cross Slope (PAR)SF8158.8to $120 $9,69014950410ft feet 4.0-5.058.8 Cross Slope (PAR)SF1059.8to $120 $1,14014950510ft feet 2.0-3.061.1 Cross Slope (PAR)SF1162.3to $120 $1,36814950610ft feet 2.0-3.068.0 Cross Slope (PAR)SF12280.8to $120 $14,59214950710ft feet -.3180.3 Vertical Change REF1081.3to136252 10 ft feet 2.0-3.086.6 Cross Slope (PAR)SF4991.8to $120 $5,92814950810ft feet 2.0-3.095.1 Cross Slope (PAR)SF79103.4to $120 $9,46214950910ft feet 2.0-3.0108.9 Cross Slope (PAR)SF36112.7to $120 $4,33214951010ft feet 2.0-3.0124.3 Cross Slope (PAR)SF52129.8to $120 $6,27014951110ft feet 3.0-4.0134.9 Cross Slope (PAR)SF110146.5to $120 $13,22414951210ft feet 3.0-4.0149.8 Cross Slope (PAR)SF29152.8to $120 $3,42014951310ft feet 2.0-3.0152.8 Cross Slope (PAR)SF48157.8to $120 $5,70014951410ft feet 2.0-3.0160.0 Cross Slope (PAR)SF88169.3to $120 $10,60214951510ft feet 4.0-5.0169.8 Cross Slope (PAR)SF143184.9to $120 $17,21414951610ft feet 2.0-3.0185.1 Cross Slope (PAR)SF13186.5to $120 $1,59614951710ft feet 4.0-5.0188.7 Cross Slope (PAR)SF63195.3to $120 $7,52414951810ft feet 2.0-3.0200.0 Cross Slope (PAR)SF55205.8to $120 $6,61214951910ft feet 2.0-3.0208.8 Cross Slope (PAR)SF108220.2to $120 $12,99614952010ft feet 2.0-3.0223.8 Cross Slope (PAR)SF139238.4to $120 $16,64414952110ft feet 6.0-7.0242.0 Cross Slope (PAR)SF37245.9to $120 $4,44614952210ft feet 6.0-7.0248.8 Cross Slope (PAR)SF48253.8to $120 $5,70014952310ft feet -.27254.5 Vertical Change REF10255.5to136253 10 ft feet 4.0-5.0255.4 Cross Slope (PAR)SF11256.6to $120 $1,36814952410ft feet 2.0-3.0257.1 Cross Slope (PAR)SF11258.3to $120 $1,36814952510ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 657 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side S MAYWOOD AVE Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912181641 Run ID District Blvd 87.25 ID Sidewalk Width Priority feet259.5 Driveway284.3to165323 feet 3.0-4.0289.0 Cross Slope (PAR)SF55294.8to $120 $6,61214952610ft feet 2.0-3.0295.6 Cross Slope (PAR)SF107306.9to $120 $12,88214952710ft feet307.8 Driveway331.6to165324 feet .27327.3 Vertical Change REF10328.3to136254 10 ft feet 3.0-4.0332.8 Cross Slope (PAR)SF72340.4to $120 $8,66414952810ft feet 2.0-3.0340.4 Cross Slope (PAR)SF10341.5to $120 $1,25414952910ft feet 3.0-4.0344.3 Cross Slope (PAR)SF141359.1to $120 $16,87214953010ft feet 2.0-3.0360.4 Cross Slope (PAR)SF31363.7to $120 $3,76214953110ft feet363.7 Driveway396.8to165325 feet 3.0-4.0396.8 Cross Slope (Driveway)SF28399.7to $40 $1,10214953210ft feet 3.0-4.0401.8 Cross Slope (PAR)SF47406.7to $120 $5,58614953310ft feet .28407.0 Vertical Change REF10408.0to136255 10 ft feet 2.0-3.0407.5 Cross Slope (PAR)SF11408.7to $120 $1,36814953410ft feet -.73411.3 Vertical Change REF10412.3to136256 10 ft feet 2.0-3.0412.3 Cross Slope (PAR)SF57418.3to $120 $6,84014953510ft feet 4.0-5.0418.7 Cross Slope (PAR)SF323452.7to $120 $38,76014953610ft feet -.35450.7 Vertical Change REF10451.7to136257 10 ft feet 6.0-7.0452.7 Cross Slope (PAR)SF15454.3to $120 $1,82414953710ft feet 5.0-6.0455.6 Cross Slope (PAR)SF62462.1to $120 $7,41014953810ft feet .88463.8 Vertical Change SF10464.8to $75 $71313625810ft feet 3.0-4.0465.2 Cross Slope (PAR)SF10466.3to $120 $1,25414953910ft feet468.1 Driveway510.1to165326 feet468.1 Driveway575.5to165327 feet 3.0-4.0510.9 Cross Slope (Driveway)SF11512.1to $40 $45614954010ft feet 2.0-3.0512.8 Cross Slope (Driveway)SF14514.3to $40 $57014954110ft feet 5.0-6.0514.6 Running Slope REF18516.5to166469 10 ft feet 3.0-4.0516.4 Cross Slope (Driveway)SF32519.8to $40 $1,29214954210ft feet 2.0-3.0519.8 Cross Slope (Driveway)SF19521.8to $40 $76014954310ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 658 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side S MAYWOOD AVE Survey Street Name Starting Street Name S DOWNEY RD End Street Name 1912181641 Run ID District Blvd 87.25 ID Sidewalk Width Priority feet .27528.8 Vertical Change REF10529.8to136259 10 ft feet 5.0-6.0546.3 Running Slope REF33549.8to166470 10 ft feet .28547.0 Vertical Change REF10548.0to136260 10 ft feet 2.0-3.0547.5 Cross Slope (Driveway)SF11548.7to $40 $45614954410ft feet 3.0-4.0561.3 Cross Slope (Driveway)SF35565.0to $40 $1,40614954510ft feet 2.0-3.0565.5 Cross Slope (Driveway)SF68572.7to $40 $2,73614954610ft $328,576.50TOTAL COST FOR:DISTRICT BLVDNside of Starting at:S MAYWOOD AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 659 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S MAYWOOD AVE Survey Street Name Starting Street Name EVERETT AVE End Street Name 1912181606 Run ID District Blvd 62.5 ID Sidewalk Width Priority feet 3.0-4.00.5 Cross Slope (PAR)SF313.8to $120 $3,76214969810ft feet 5.0-6.03.8 Cross Slope (PAR)SF125.1to $120 $1,48214969910ft feet 3.0-4.07.2 Cross Slope (PAR)SF138.6to $120 $1,59614970010ft feet 2.0-3.014.1 Cross Slope (PAR)SF7522.0to $120 $9,00614970110ft feet .3517.3 Vertical Change REF1018.3to136284 10 ft feet 4.0-5.022.9 Cross Slope (PAR)SF4828.0to $120 $5,81414970210ft feet 2.0-3.033.5 Cross Slope (PAR)SF35170.4to $120 $42,06614970310ft feet 2.8847.9 Vertical Change REF1048.9to136285 10 ft feet 4.0-5.070.8 Cross Slope (PAR)SF7578.7to $120 $9,00614970410ft feet 3.0-4.080.8 Cross Slope (PAR)SF1382.2to $120 $1,59614970510ft feet 2.0-3.082.4 Cross Slope (PAR)SF7290.0to $120 $8,66414970610ft feet -.2783.1 Vertical Change REF1084.1to136286 10 ft feet 3.0-4.092.6 Cross Slope (PAR)SF1794.4to $120 $2,05214970710ft feet 2.0-3.094.4 Cross Slope (PAR)SF2997.4to $120 $3,42014970810ft feet 2.0-3.0107.1 Cross Slope (PAR)SF106118.3to $120 $12,76814970910ft feet 2.0-3.0123.5 Cross Slope (PAR)SF117135.8to $120 $14,02214971010ft feet 4.0-5.0147.8 Cross Slope (PAR)SF165165.2to $120 $19,83614971110ft feet165.2 Driveway198.1to165338 feet 2.0-3.0199.0 Cross Slope (PAR)SF106210.2to $120 $12,76814971210ft feet .42212.3 Vertical Change LF10213.3to $75 $71313628710ft feet 2.0-3.0214.2 Cross Slope (PAR)SF50219.5to $120 $6,04214971310ft feet 3.44214.6 Vertical Change REF10215.6to136288 10 ft feet .35217.4 Vertical Change REF28220.3to136289 10 ft feet 2.0-3.0227.9 Cross Slope (PAR)SF23230.3to $120 $2,73614971410ft feet .48240.5 Vertical Change LF10241.5to $75 $71313629010ft feet 7.0-8.0241.9 Cross Slope (PAR)SF17243.7to $120 $2,05214971510ft feet 3.0-4.0246.0 Cross Slope (PAR)SF33249.5to $120 $3,99014971610ft feet 2.0-3.0249.5 Cross Slope (PAR)SF23251.9to $120 $2,73614971710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 660 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side S MAYWOOD AVE Survey Street Name Starting Street Name EVERETT AVE End Street Name 1912181606 Run ID District Blvd 62.5 ID Sidewalk Width Priority feet 2.0-3.0254.2 Cross Slope (PAR)SF151270.1to $120 $18,12614971810ft feet 3.5266.6 Vertical Change REF10267.6to136291 10 ft feet 4.0-5.0270.1 Cross Slope (PAR)SF21272.3to $120 $2,50814971910ft feet 3.0-4.0282.3 Cross Slope (PAR)SF19284.3to $120 $2,28014972010ft feet 2.0-3.0284.4 Cross Slope (PAR)SF175302.8to $120 $20,97614972110ft feet 3.0-4.0307.5 Cross Slope (PAR)SF18309.4to $120 $2,16614972210ft feet 2.0-3.0309.4 Cross Slope (PAR)SF19311.4to $120 $2,28014972310ft feet 2.0-3.0323.2 Cross Slope (PAR)SF29326.2to $120 $3,42014972410ft feet 3.0-4.0328.7 Cross Slope (PAR)SF162345.7to $120 $19,38014972510ft feet 2.0-3.0345.7 Cross Slope (PAR)SF29348.7to $120 $3,42014972610ft feet 2.0-3.0352.4 Cross Slope (PAR)SF25355.0to $120 $2,96414972710ft feet 2.0-3.0359.3 Cross Slope (PAR)SF14360.8to $120 $1,71014972810ft feet 4.0-5.0361.1 Cross Slope (PAR)SF57367.1to $120 $6,84014972910ft feet 2.0-3.0367.1 Cross Slope (PAR)SF22369.4to $120 $2,62214973010ft $255,531.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:S MAYWOOD AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 661 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name S ATLANTIC BLVD End Street Name 2001281028 Run ID District Blvd 63 ID Sidewalk Width Priority feet 4.0-5.00.2 Cross Slope (PAR)SF11013.9to $120 $13,1521639468ft feet 3.0-4.020.1 Cross Slope (PAR)SF6227.9to $120 $7,4881639478ft feet 2.3824.1 Vertical Change REF825.1to140078 8 ft feet 2.0-3.028.3 Cross Slope (PAR)SF18150.9to $120 $21,6961639488ft feet .2637.2 Vertical Change REF838.2to140079 8 ft feet 4.0-5.050.9 Cross Slope (PAR)SF4957.0to $120 $5,8561639498ft feet 3.0-4.061.8 Cross Slope (PAR)SF19586.2to $120 $23,4241639508ft feet86.7 Driveway116.3to166389 feet 4.0-5.0117.4 Cross Slope (PAR)SF8118.4to $120 $9601639518ft feet 2.0-3.0121.7 Cross Slope (PAR)SF253153.3to $120 $30,3361639528ft feet .53145.4 Vertical Change REF8146.4to140081 8 ft feet 4.0-5.0154.5 Cross Slope (PAR)SF293191.1to $120 $35,1361639538ft feet 4.0-5.0193.3 Cross Slope (PAR)SF118208.1to $120 $14,2081639548ft $152,256.00TOTAL COST FOR:DISTRICT BLVDNside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 662 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001280952 Run ID District Blvd 54.25 ID Sidewalk Width Priority feet 4.0-5.00.2 Cross Slope (PAR)SF236.0to $120 $2,7841636644ft feet -.279.6 Vertical Change LF410.6to $75 $3001399894ft feet10.2 Driveway84.8to166361 feet -.4425.3 Vertical Change REF426.3to139990 4 ft feet .2664.2 Vertical Change REF465.2to139991 4 ft feet 2.0-3.087.9 Cross Slope (PAR)SF4097.8to $120 $4,7521636654ft feet 4.0-5.098.9 Cross Slope (PAR)SF58113.5to $120 $7,0081636664ft feet 2.0-3.0115.9 Cross Slope (PAR)SF15119.6to $120 $1,7761636674ft feet 2.0-3.0131.1 Cross Slope (PAR)SF14134.7to $120 $1,7281636684ft feet 3.0-4.0138.8 Cross Slope (PAR)SF44149.9to $120 $5,3281636694ft feet 2.0-3.0150.5 Cross Slope (PAR)SF28157.6to $120 $3,4081636704ft feet 3.0-4.0160.0 Cross Slope (PAR)SF5161.3to $120 $6241636714ft feet 2.0-3.0161.3 Cross Slope (PAR)SF6162.8to $120 $7201636724ft feet 5.0-6.0165.3 Cross Slope (PAR)SF16169.4to $120 $1,9681636734ft feet 3.0-4.0171.4 Cross Slope (PAR)SF15175.2to $120 $1,8241636744ft feet 2.0-3.0177.9 Cross Slope (PAR)SF38187.3to $120 $4,5121636754ft feet .26184.5 Vertical Change REF4185.5to139992 4 ft feet 4.0-5.0189.8 Cross Slope (PAR)SF165231.0to $120 $19,7761636764ft feet 2.0-3.0231.0 Cross Slope (PAR)SF40240.9to $120 $4,7521636774ft feet 2.0-3.0243.4 Cross Slope (PAR)SF80263.3to $120 $9,5521636784ft feet -.29260.5 Vertical Change LF4261.5to $75 $3001399934ft feet 4.0-5.0269.7 Cross Slope (PAR)SF37279.0to $120 $4,4641636794ft feet 5.0-6.0281.3 Cross Slope (PAR)SF6282.7to $120 $6721636804ft feet282.7 Driveway307.2to166362 feet 3.0-4.0308.2 Cross Slope (PAR)SF69325.4to $120 $8,2561636814ft feet 3.0-4.0327.8 Cross Slope (PAR)SF45339.1to $120 $5,4241636824ft feet 5.0-6.0339.4 Cross Slope (PAR)SF12342.3to $120 $1,3921636834ft feet343.9 Driveway361.2to166363 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 663 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001280952 Run ID District Blvd 54.25 ID Sidewalk Width Priority feet 3.0-4.0362.8 Cross Slope (PAR)SF49375.0to $120 $5,8561636844ft feet -.32373.8 Vertical Change REF4374.8to139994 4 ft feet 3.0-4.0377.5 Cross Slope (PAR)SF4378.5to $120 $4801636854ft feet 2.0-3.0378.8 Cross Slope (PAR)SF6380.2to $120 $6721636864ft feet 3.0-4.0384.9 Cross Slope (PAR)SF52398.0to $120 $6,2881636874ft feet 5.0-6.0398.0 Cross Slope (PAR)SF10400.6to $120 $1,2481636884ft feet 3.0-4.0400.9 Cross Slope (PAR)SF5402.1to $120 $5761636894ft feet402.1 Driveway420.1to166364 feet 4.0-5.0421.3 Cross Slope (PAR)SF5422.6to $120 $6241636904ft feet 4.0-5.0424.8 Cross Slope (PAR)SF4425.8to $120 $4801636914ft feet 2.0-3.0426.9 Cross Slope (PAR)SF7428.6to $120 $8161636924ft feet 5.0-6.0430.2 Running Slope SF4431.3to $120 $5281667524ft $108,888.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 664 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name ALAMO AVE End Street Name 2001281000 Run ID District Blvd 61.5 ID Sidewalk Width Priority feet 4.0-5.00.0 Cross Slope (PAR)SF699.8to $120 $8,2321636937ft feet 2.0-3.09.8 Cross Slope (PAR)SF1011.2to $120 $1,1761636947ft feet15.2 Driveway49.7to166365 feet 2.0-3.051.8 Cross Slope (PAR)SF5259.2to $120 $6,2161636957ft feet 2.0-3.062.3 Cross Slope (PAR)SF7172.4to $120 $8,4841636967ft feet82.3 Driveway126.6to166366 feet 2.0-3.0126.7 Cross Slope (Driveway)SF13128.5to $40 $5041636977ft feet -.37127.0 Vertical Change REF7128.0to139996 7 ft feet 2.0-3.0130.6 Cross Slope (PAR)SF179156.1to $120 $21,4201636987ft feet -.29135.8 Vertical Change REF7136.8to139997 7 ft feet .56144.4 Vertical Change REF7145.4to139998 7 ft feet 2.0-3.0160.8 Cross Slope (PAR)SF66170.3to $120 $7,9801636997ft feet 4.0-5.0170.8 Cross Slope (PAR)SF78181.9to $120 $9,3241637007ft feet 2.0-3.0183.1 Cross Slope (PAR)SF50190.3to $120 $6,0481637017ft feet .41191.7 Vertical Change REF7192.7to139999 7 ft feet 4.0-5.0192.1 Cross Slope (PAR)SF8193.3to $120 $1,0081637027ft feet -.69195.1 Vertical Change REF7196.1to140000 7 ft feet 4.0-5.0196.0 Cross Slope (PAR)SF109211.5to $120 $13,0201637037ft feet .27203.3 Vertical Change REF7204.3to140001 7 ft feet 2.0-3.0212.0 Cross Slope (PAR)SF51219.3to $120 $6,1321637047ft feet219.9 Driveway246.3to166367 feet 2.0-3.0247.9 Cross Slope (PAR)SF93261.2to $120 $11,1721637057ft feet261.4 Driveway304.5to166368 feet 2.0-3.0306.3 Cross Slope (PAR)SF7307.3to $120 $8401637067ft feet 2.0-3.0309.5 Cross Slope (PAR)SF36314.6to $120 $4,2841637077ft feet 2.0-3.0327.7 Cross Slope (PAR)SF101342.1to $120 $12,0961637087ft feet 6.0-7.0339.6 Running Slope REF10341.0to166753 7 ft feet 2.0-3.0349.6 Cross Slope (PAR)SF69359.4to $120 $8,2321637097ft feet 3.0-4.0365.0 Cross Slope (PAR)SF92378.2to $120 $11,0881637107ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 665 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name ALAMO AVE End Street Name 2001281000 Run ID District Blvd 61.5 ID Sidewalk Width Priority feet 2.0-3.0378.6 Cross Slope (PAR)SF59387.0to $120 $7,0561637117ft feet 2.0-3.0390.3 Cross Slope (PAR)SF29394.4to $120 $3,4441637127ft feet 4.0-5.0394.4 Cross Slope (PAR)SF20397.2to $120 $2,3521637137ft feet 2.0-3.0398.7 Cross Slope (PAR)SF63407.7to $120 $7,5601637147ft feet 5.0-6.0409.0 Cross Slope (PAR)SF97422.9to $120 $11,6761637157ft feet 5.0-6.0426.2 Cross Slope (PAR)SF29430.3to $120 $3,4441637167ft feet 3.0-4.0432.8 Cross Slope (PAR)SF16435.1to $120 $1,9321637177ft feet 2.0-3.0439.4 Cross Slope (PAR)SF228472.0to $120 $27,3841637187ft feet 3.0-4.0476.6 Cross Slope (PAR)SF11478.1to $120 $1,2601637197ft feet 2.0-3.0478.9 Cross Slope (PAR)SF241513.3to $120 $28,8961637207ft feet 2.0-3.0515.8 Cross Slope (PAR)SF50522.9to $120 $5,9641637217ft feet 3.0-4.0525.0 Cross Slope (PAR)SF29529.2to $120 $3,5281637227ft feet 2.0-3.0529.3 Cross Slope (PAR)SF23532.6to $120 $2,7721637237ft feet532.6 Driveway555.6to166369 feet 3.0-4.0555.6 Cross Slope (Driveway)SF23558.9to $40 $9241637247ft feet -.81560.7 Vertical Change SF7561.7to $75 $5251400027ft feet 2.0-3.0565.3 Cross Slope (PAR)SF11566.8to $120 $1,2601637257ft feet 2.0-3.0587.3 Cross Slope (PAR)SF8588.4to $120 $9241637267ft feet617.8 Driveway649.5to166370 feet .35618.4 Vertical Change REF7619.4to140003 7 ft feet 3.0-4.0650.9 Cross Slope (PAR)SF8652.0to $120 $9241637277ft feet 2.0-3.0652.0 Cross Slope (PAR)SF8653.2to $120 $1,0081637287ft feet 5.0-6.0662.8 Running Slope SF14664.8to $120 $1,6801667547ft feet668.9 Driveway691.3to166371 feet668.9 Driveway792.7to166372 feet 2.0-3.0697.9 Cross Slope (Driveway)SF12699.6to $40 $4761637297ft feet 5.0-6.0702.8 Running Slope REF34707.6to166755 7 ft feet 6.0-7.0708.8 Running Slope REF7709.8to166756 7 ft feet 5.0-6.0710.6 Running Slope REF7711.6to166757 7 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 666 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name ALAMO AVE End Street Name 2001281000 Run ID District Blvd 61.5 ID Sidewalk Width Priority feet 6.0-7.0712.2 Running Slope REF11713.7to166758 7 ft feet .29713.9 Vertical Change REF7714.9to140004 7 ft feet 5.0-6.0718.1 Running Slope REF43724.3to166759 7 ft feet 4.0-5.0718.8 Cross Slope (Driveway)SF60727.3to $40 $2,3801637307ft feet 5.0-6.0728.8 Running Slope REF20731.7to166760 7 ft feet 3.0-4.0731.8 Cross Slope (Driveway)SF15734.0to $40 $6161637317ft feet 3.0-4.0736.4 Cross Slope (Driveway)SF19739.1to $40 $7561637327ft feet 2.0-3.0739.1 Cross Slope (Driveway)SF8740.3to $40 $3361637337ft feet 2.0-3.0753.1 Cross Slope (Driveway)SF22756.3to $40 $8961637347ft feet 2.0-3.0759.5 Cross Slope (Driveway)SF7760.5to $40 $2801637357ft feet 3.0-4.0765.6 Cross Slope (Driveway)SF13767.5to $40 $5321637367ft feet 3.0-4.0770.1 Cross Slope (Driveway)SF7771.1to $40 $2801637377ft feet 2.0-3.0772.5 Cross Slope (Driveway)SF48779.3to $40 $1,9041637387ft feet 4.0-5.0785.2 Cross Slope (Driveway)SF29789.3to $40 $1,1481637397ft feet 2.0-3.0791.1 Cross Slope (Driveway)SF8792.2to $40 $3081637407ft $261,681.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 667 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001281112 Run ID District Blvd 32.25 ID Sidewalk Width Priority feet 5.0-6.01.3 Running Slope SF153.2to $120 $1,8241667888ft feet .372.7 Vertical Change LF83.7to $75 $6001401908ft feet 9.0-10.05.0 Cross Slope (PAR)SF7214.0to $120 $8,6401643408ft feet 7.0-8.012.3 Running Slope REF813.3to166789 8 ft $11,064.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 668 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001281113 Run ID District Blvd 31 ID Sidewalk Width Priority feet 2.0-3.00.9 Cross Slope (PAR)SF608.4to $120 $7,2001643418ft feet 2.0-3.021.4 Cross Slope (PAR)SF16542.0to $120 $19,7761643428ft feet42.0 Driveway92.5to166399 feet -.2678.4 Vertical Change REF879.4to140191 8 ft feet -.3488.5 Vertical Change REF889.5to140192 8 ft $26,976.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 669 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001281115 Run ID District Blvd 55 ID Sidewalk Width Priority feet 6.0-7.02.7 Cross Slope (PAR)SF54.2to $120 $5401643433ft feet 5.0-6.04.6 Cross Slope (PAR)SF76.8to $120 $7921643443ft feet 6.0-7.013.3 Cross Slope (PAR)SF615.2to $120 $6841643453ft feet .3916.4 Vertical Change LF317.4to $75 $2251401933ft feet 6.0-7.020.9 Cross Slope (PAR)SF3031.0to $120 $3,6361643463ft feet .3127.5 Vertical Change REF328.5to140194 3 ft feet 5.0-6.032.4 Cross Slope (PAR)SF634.5to $120 $7561643473ft feet .3335.8 Vertical Change REF336.8to140195 3 ft feet 6.0-7.035.9 Cross Slope (PAR)SF1340.2to $120 $1,5481643483ft feet 4.0-5.041.8 Cross Slope (Driveway)SF1546.8to $40 $6001643493ft feet 7.0-8.049.1 Cross Slope (Driveway)SF751.5to $40 $2881643503ft feet 3.0-4.053.7 Cross Slope (Driveway)SF354.8to $40 $1321643513ft feet 2.0-3.060.8 Cross Slope (Driveway)SF361.9to $40 $1321643523ft feet 5.0-6.064.3 Cross Slope (Driveway)SF1268.4to $40 $4921643533ft feet -.6470.8 Vertical Change REF371.8to140196 3 ft feet 3.0-4.071.4 Cross Slope (Driveway)SF874.1to $40 $3241643543ft feet 4.0-5.076.2 Cross Slope (Driveway)SF3487.5to $40 $1,3561643553ft feet 2.0-3.088.6 Cross Slope (Driveway)SF389.7to $40 $1321643563ft feet .3492.7 Vertical Change REF393.7to140197 3 ft feet 4.0-5.092.7 Cross Slope (PAR)SF794.9to $120 $7921643573ft feet 2.0-3.095.7 Cross Slope (PAR)SF15100.8to $120 $1,8361643583ft feet 1.298.1 Vertical Change REF399.1to140198 3 ft feet 4.0-5.0102.5 Cross Slope (PAR)SF9105.5to $120 $1,0801643593ft feet 3.0-4.0109.0 Cross Slope (PAR)SF5110.5to $120 $5401643603ft $15,885.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 670 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S DISTRICT BLVD Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name HELIOTROPE AVE End Street Name 2001281117 Run ID District Blvd 55 ID Sidewalk Width Priority feet 2.0-3.07.0 Cross Slope (PAR)SF79.3to $120 $8281643613ft feet 3.0-4.013.4 Cross Slope (PAR)SF2220.7to $120 $2,6281643623ft feet .3213.7 Vertical Change REF314.7to140199 3 ft feet 5.0-6.020.7 Cross Slope (PAR)SF3733.1to $120 $4,4641643633ft feet 4.0-5.036.1 Cross Slope (PAR)SF537.8to $120 $6121643643ft feet 5.0-6.040.4 Cross Slope (PAR)SF542.0to $120 $5761643653ft feet 3.0-4.042.4 Cross Slope (PAR)SF1547.5to $120 $1,8361643663ft feet 2.0-3.047.9 Cross Slope (PAR)SF11084.7to $120 $13,2481643673ft feet 1.2948.6 Vertical Change REF349.6to140200 3 ft feet .3465.6 Vertical Change REF366.6to140201 3 ft feet 4.0-5.084.8 Cross Slope (PAR)SF2994.5to $120 $3,4921643683ft feet 4.0-5.096.8 Cross Slope (PAR)SF698.8to $120 $7201643693ft feet .54102.3 Vertical Change SF3103.3to $75 $2251402033ft feet 4.0-5.0107.0 Cross Slope (PAR)SF12110.9to $120 $1,4041643703ft feet 2.0-3.0110.9 Cross Slope (PAR)SF11114.4to $120 $1,2601643713ft $31,293.00TOTAL COST FOR:DISTRICT BLVDSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 671 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191048 Run ID District Blvd 56.5 ID Sidewalk Width Priority feet0.0 Driveway19.0to165289 feet0.0 Driveway147.5to165290 feet 2.0-3.019.4 Cross Slope (Driveway)SF19339.7to $40 $7,71414900610ft feet 4.0-5.040.6 Cross Slope (Driveway)SF1342.0to $40 $53214900710ft feet 6.0-7.043.4 Cross Slope (Driveway)SF1044.5to $40 $41814900810ft feet 3.0-4.047.7 Cross Slope (Driveway)SF1148.9to $40 $45614900910ft feet 2.0-3.051.3 Cross Slope (Driveway)SF5056.6to $40 $2,01414901010ft feet 2.0-3.062.5 Cross Slope (Driveway)SF5268.0to $40 $2,09014901110ft feet 3.0-4.077.2 Cross Slope (Driveway)SF2980.3to $40 $1,17814901210ft feet 2.0-3.080.8 Cross Slope (Driveway)SF1081.8to $40 $38014901310ft feet 2.0-3.095.5 Cross Slope (Driveway)SF135109.7to $40 $5,39614901410ft feet 3.0-4.0114.0 Cross Slope (Driveway)SF30117.2to $40 $1,21614901510ft feet 2.0-3.0118.9 Cross Slope (Driveway)SF25121.5to $40 $98814901610ft feet 2.0-3.0126.0 Cross Slope (Driveway)SF13127.4to $40 $53214901710ft $22,914.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 672 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING (4949 DISTRICT BLVD) End Street Name 1912191054 Run ID District Blvd 68.5 ID Sidewalk Width Priority feet 2.0-3.00.4 Cross Slope (PAR)SF404.6to $120 $4,78814897110ft feet 2.0-3.07.8 Cross Slope (PAR)SF11820.2to $120 $14,13614897210ft feet 2.0-3.022.8 Cross Slope (PAR)SF1624.5to $120 $1,93814897310ft feet28.8 Driveway55.6to165285 feet 2.0-3.056.8 Cross Slope (PAR)SF8365.5to $120 $9,91814897410ft feet 2.0-3.072.0 Cross Slope (PAR)SF1773.8to $120 $2,05214897510ft feet73.8 Driveway107.3to165286 feet -.31107.7 Vertical Change LF10108.7to $75 $71313614110ft feet .32110.0 Vertical Change REF10111.0to136142 10 ft feet 5.0-6.0110.6 Cross Slope (PAR)SF11111.8to $120 $1,36814897610ft feet 3.0-4.0112.2 Cross Slope (PAR)SF65119.0to $120 $7,75214897710ft feet 2.0-3.0119.0 Cross Slope (PAR)SF48124.0to $120 $5,70014897810ft feet 2.0-3.0131.3 Cross Slope (PAR)SF80139.7to $120 $9,57614897910ft feet 2.0-3.0145.7 Cross Slope (PAR)SF46150.5to $120 $5,47214898010ft feet 2.0-3.0155.6 Cross Slope (PAR)SF45160.3to $120 $5,35814898110ft feet 2.0-3.0167.2 Cross Slope (PAR)SF39171.3to $120 $4,67414898210ft feet 2.0-3.0179.8 Cross Slope (PAR)SF92189.5to $120 $11,05814898310ft feet 2.0-3.0243.9 Cross Slope (PAR)SF35247.6to $120 $4,21814898410ft feet 2.0-3.0251.9 Cross Slope (PAR)SF65258.7to $120 $7,75214898510ft feet 2.0-3.0261.8 Cross Slope (PAR)SF100272.3to $120 $11,97014898610ft feet 1.36273.6 Vertical Change SF10274.6to $75 $71313614310ft feet 2.0-3.0275.3 Cross Slope (PAR)SF15276.9to $120 $1,82414898710ft feet 2.0-3.0286.5 Cross Slope (PAR)SF126299.8to $120 $15,16214898810ft feet -.55290.4 Vertical Change REF10291.4to136144 10 ft feet 3.0-4.0337.9 Cross Slope (PAR)SF33341.4to $120 $3,99014898910ft feet 2.0-3.0342.4 Cross Slope (PAR)SF14343.9to $120 $1,71014899010ft feet 2.0-3.0359.3 Cross Slope (PAR)SF16361.0to $120 $1,93814899110ft feet 2.0-3.0364.3 Cross Slope (PAR)SF38368.3to $120 $4,56014899210ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 673 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING (4949 DISTRICT BLVD) End Street Name 1912191054 Run ID District Blvd 68.5 ID Sidewalk Width Priority feet 2.0-3.0371.3 Cross Slope (PAR)SF36375.1to $120 $4,33214899310ft feet 2.0-3.0385.8 Cross Slope (PAR)SF43390.3to $120 $5,13014899410ft feet 2.0-3.0393.8 Cross Slope (PAR)SF29396.8to $120 $3,42014899510ft feet406.2 Driveway430.0to165287 feet406.2 Driveway558.2to165288 feet 3.0-4.0430.3 Cross Slope (Driveway)SF26433.0to $40 $1,02614899610ft feet 2.0-3.0433.6 Cross Slope (Driveway)SF10434.6to $40 $38014899710ft feet 3.0-4.0438.8 Cross Slope (Driveway)SF29441.8to $40 $1,14014899810ft feet .27441.7 Vertical Change REF10442.7to136145 10 ft feet 2.0-3.0443.6 Cross Slope (Driveway)SF46448.4to $40 $1,82414899910ft feet 2.0-3.0451.3 Cross Slope (Driveway)SF11452.5to $40 $45614900010ft feet 2.0-3.0455.3 Cross Slope (Driveway)SF28458.2to $40 $1,10214900110ft feet 2.0-3.0488.9 Cross Slope (Driveway)SF51494.3to $40 $2,05214900210ft feet 2.0-3.0500.3 Cross Slope (Driveway)SF52505.8to $40 $2,09014900310ft feet 2.0-3.0516.2 Cross Slope (Driveway)SF27519.0to $40 $1,06414900410ft feet 2.0-3.0536.3 Cross Slope (Driveway)SF15537.9to $40 $60814900510ft $162,963.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 674 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name GIFFORD AVE End Street Name 1912190859 Run ID District Blvd 40 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF282.9to $120 $3,39314936010ft feet 2.0-3.05.8 Cross Slope (PAR)SF248.3to $120 $2,92514936110ft feet 2.0-3.037.2 Cross Slope (PAR)SF3640.9to $120 $4,32914936210ft feet 2.0-3.053.8 Cross Slope (PAR)SF8862.8to $120 $10,53014936310ft feet 2.0-3.068.3 Cross Slope (PAR)SF6775.2to $120 $8,07314936410ft feet 2.0-3.077.5 Cross Slope (PAR)SF10888.6to $120 $12,98714936510ft feet94.2 Driveway118.8to165313 feet .37122.3 Vertical Change LF10123.3to $75 $73113623210ft feet 2.0-3.0123.4 Cross Slope (PAR)SF164140.2to $120 $19,65614936610ft feet 3.0-4.0145.3 Cross Slope (PAR)SF14146.7to $120 $1,63814936710ft feet 2.0-3.0147.8 Cross Slope (PAR)SF47152.6to $120 $5,61614936810ft feet 2.0-3.0155.0 Cross Slope (PAR)SF16156.6to $120 $1,87214936910ft feet 2.0-3.0158.8 Cross Slope (PAR)SF83167.3to $120 $9,94514937010ft feet 4.0-5.0167.3 Cross Slope (PAR)SF21169.5to $120 $2,57414937110ft feet 2.0-3.0181.6 Cross Slope (PAR)SF70188.8to $120 $8,42414937210ft feet 3.0-4.0192.1 Cross Slope (PAR)SF82200.5to $120 $9,82814937310ft feet 2.0-3.0200.5 Cross Slope (PAR)SF19202.4to $120 $2,22314937410ft $104,744.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 675 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 49TH ST End Street Name 1912190907 Run ID District Blvd 49 ID Sidewalk Width Priority feet 2.0-3.010.4 Cross Slope (PAR)SF2412.9to $120 $2,92514932510ft feet 2.0-3.016.5 Cross Slope (PAR)SF16233.1to $120 $19,42214932610ft feet 3.0-4.047.9 Cross Slope (PAR)SF2250.2to $120 $2,69114932710ft feet 2.0-3.051.3 Cross Slope (PAR)SF2053.4to $120 $2,45714932810ft feet -.2957.9 Vertical Change LF1058.9to $75 $73113622410ft feet 1.7460.2 Vertical Change SF1061.2to $75 $73113622510ft feet 2.0-3.063.6 Cross Slope (PAR)SF1665.2to $120 $1,87214932910ft feet .3765.0 Vertical Change REF1066.0to136226 10 ft feet 2.0-3.070.1 Cross Slope (PAR)SF1471.5to $120 $1,63814933010ft feet 2.0-3.074.5 Cross Slope (PAR)SF3277.8to $120 $3,86114933110ft feet 2.0-3.080.3 Cross Slope (PAR)SF1882.1to $120 $2,10614933210ft feet84.5 Driveway109.3to165310 feet .3686.4 Vertical Change REF1087.4to136227 10 ft feet 2.0-3.0112.0 Cross Slope (PAR)SF61118.3to $120 $7,37114933310ft feet 2.0-3.0120.8 Cross Slope (PAR)SF37124.6to $120 $4,44614933410ft feet 2.0-3.0129.6 Cross Slope (PAR)SF88138.6to $120 $10,53014933510ft feet 2.0-3.0146.8 Cross Slope (PAR)SF24149.3to $120 $2,92514933610ft feet 2.0-3.0153.0 Cross Slope (PAR)SF27155.8to $120 $3,27614933710ft feet 3.0-4.0177.1 Cross Slope (PAR)SF12178.3to $120 $1,40414933810ft feet 4.0-5.0183.7 Cross Slope (PAR)SF98193.8to $120 $11,81714933910ft $80,203.50TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 676 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name E 50TH ST End Street Name 1912190913 Run ID District Blvd 50.5 ID Sidewalk Width Priority feet 2.0-3.02.1 Cross Slope (PAR)SF325.4to $120 $3,86114928810ft feet 2.0-3.08.4 Cross Slope (PAR)SF4813.3to $120 $5,73314928910ft feet 2.0-3.018.0 Cross Slope (PAR)SF4222.3to $120 $5,03114929010ft feet 2.0-3.025.3 Cross Slope (PAR)SF11437.0to $120 $13,68914929110ft feet 3.0-4.039.3 Cross Slope (PAR)SF2441.8to $120 $2,92514929210ft feet 2.0-3.042.0 Cross Slope (PAR)SF1343.3to $120 $1,52114929310ft feet 2.0-3.047.1 Cross Slope (PAR)SF12960.3to $120 $15,44414929410ft feet 2.0-3.072.5 Cross Slope (PAR)SF5678.2to $120 $6,66914929510ft feet 2.0-3.080.7 Cross Slope (PAR)SF6487.3to $120 $7,72214929610ft feet 2.0-3.091.9 Cross Slope (PAR)SF1293.1to $120 $1,40414929710ft feet 3.0-4.095.8 Cross Slope (PAR)SF53101.2to $120 $6,31814929810ft feet 5.0-6.0101.2 Cross Slope (PAR)SF16102.8to $120 $1,87214929910ft feet 3.0-4.0104.3 Cross Slope (PAR)SF11105.4to $120 $1,28714930010ft feet 2.0-3.0105.4 Cross Slope (PAR)SF23107.8to $120 $2,80814930110ft feet 2.0-3.0110.0 Cross Slope (PAR)SF115121.8to $120 $13,80614930210ft feet .26126.3 Vertical Change LF10127.3to $75 $73113621710ft feet -.41128.9 Vertical Change LF10129.9to $75 $73113621810ft feet 3.0-4.0133.8 Cross Slope (PAR)SF20135.9to $120 $2,45714930310ft feet 2.0-3.0139.5 Cross Slope (PAR)SF110150.8to $120 $13,22114930410ft feet -.29140.4 Vertical Change REF10141.4to136219 10 ft feet 3.0-4.0163.1 Cross Slope (PAR)SF13164.4to $120 $1,52114930510ft feet 2.0-3.0166.0 Cross Slope (PAR)SF31169.2to $120 $3,74414930610ft feet 2.0-3.0173.3 Cross Slope (PAR)SF10174.3to $120 $1,17014930710ft feet 3.0-4.0176.8 Cross Slope (PAR)SF99187.0to $120 $11,93414930810ft feet 5.0-6.0187.0 Cross Slope (PAR)SF29190.0to $120 $3,51014930910ft feet 4.0-5.0192.8 Cross Slope (PAR)SF59198.8to $120 $7,02014931010ft $136,129.50TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 677 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side TRAIN CROSSING Survey Street Name Starting Street Name FRUITLAND AVE End Street Name 1912190927 Run ID District Blvd 69.5 ID Sidewalk Width Priority feet 2.0-3.00.4 Cross Slope (PAR)SF14534.6to $120 $17,4421492274ft feet9.8 Continuous Width REF410.8to167197 4 ft feet31.0 Continuous Width REF432.0to167198 4 ft feet33.9 Continuous Width SF434.9to $120 $5101672914ft feet 5.0-6.035.3 Cross Slope (PAR)SF1538.8to $120 $1,7851492284ft feet 3.0-4.038.8 Cross Slope (PAR)SF2043.4to $120 $2,3461492294ft feet 2.0-3.044.6 Cross Slope (PAR)SF3753.2to $120 $4,3861492304ft feet 4.0-5.053.8 Cross Slope (PAR)SF1356.8to $120 $1,5301492314ft feet 2.0-3.056.8 Cross Slope (PAR)SF1660.5to $120 $1,8871492324ft feet 2.0-3.062.7 Cross Slope (PAR)SF563.9to $120 $6121492334ft feet 4.0-5.065.3 Cross Slope (PAR)SF9687.9to $120 $11,5261492344ft feet70.4 Continuous Width SF471.4to $120 $5101675774ft feet 3.0-4.091.3 Cross Slope (PAR)SF592.5to $120 $6121492354ft feet 5.0-6.094.3 Cross Slope (PAR)SF1196.8to $120 $1,2751492364ft feet 3.0-4.097.8 Cross Slope (PAR)SF57111.3to $120 $6,8851492374ft feet -.31108.9 Vertical Change REF4109.9to136211 4 ft feet 3.0-4.0116.3 Cross Slope (PAR)SF4117.3to $120 $5101492384ft feet 2.0-3.0117.3 Cross Slope (PAR)SF75135.0to $120 $9,0271492394ft feet 3.0-4.0140.6 Cross Slope (PAR)SF10143.0to $120 $1,2241492404ft feet 2.0-3.0143.0 Cross Slope (PAR)SF6144.3to $120 $6631492414ft feet145.8 Continuous Width REF4146.8to167217 4 ft feet 2.0-3.0149.2 Cross Slope (PAR)SF5150.3to $120 $5611492424ft feet 3.0-4.0153.0 Cross Slope (PAR)SF23158.3to $120 $2,7031492434ft feet -.31153.7 Vertical Change REF4154.7to136212 4 ft feet 5.0-6.0159.9 Cross Slope (PAR)SF9162.0to $120 $1,0711492444ft feet 4.0-5.0168.2 Cross Slope (PAR)SF37176.8to $120 $4,3861492454ft feet 5.0-6.0180.3 Cross Slope (PAR)SF6181.8to $120 $7651492464ft $72,216.00TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 678 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE / N DISTRICT BLVD Street Side TRAIN CROSSING (4735 DISTRICT BLVD) Survey Street Name Starting Street Name CORONA AVE End Street Name 1912191116 Run ID District Blvd 52 ID Sidewalk Width Priority feet2.7 Driveway59.5to165275 feet 2.0-3.059.5 Cross Slope (Driveway)SF9369.3to $40 $3,72414884610ft feet 3.0-4.073.8 Cross Slope (PAR)SF5079.1to $120 $6,04214884710ft feet 4.0-5.081.3 Cross Slope (PAR)SF4485.9to $120 $5,24414884810ft feet 2.0-3.087.3 Cross Slope (PAR)SF133101.3to $120 $15,96014884910ft feet105.4 Driveway125.6to165276 feet 2.0-3.0150.7 Cross Slope (PAR)SF10151.8to $120 $1,25414885010ft feet 2.0-3.0166.2 Cross Slope (PAR)SF28169.1to $120 $3,30614885110ft feet 2.0-3.0173.2 Cross Slope (PAR)SF10174.3to $120 $1,25414885210ft feet 2.0-3.0182.2 Cross Slope (PAR)SF21184.4to $120 $2,50814885310ft feet 2.0-3.0208.4 Cross Slope (PAR)SF40212.6to $120 $4,78814885410ft feet 2.0-3.0229.5 Cross Slope (PAR)SF74237.3to $120 $8,89214885510ft feet 2.0-3.0254.1 Cross Slope (PAR)SF29257.1to $120 $3,42014885610ft feet270.0 Cold Patch 37273.9to140359 10 ft feet 3.0-4.0275.8 Cross Slope (PAR)SF15277.4to $120 $1,82414885710ft feet 2.0-3.0286.0 Cross Slope (PAR)SF22288.3to $120 $2,62214885810ft feet 4.0-5.0289.9 Cross Slope (PAR)SF36293.7to $120 $4,33214885910ft feet 2.0-3.0294.3 Cross Slope (PAR)SF76302.3to $120 $9,12014886010ft feet 2.0-3.0310.3 Cross Slope (PAR)SF26313.0to $120 $3,07814886110ft feet 4.0-5.0313.5 Cross Slope (PAR)SF64320.2to $120 $7,63814886210ft feet 2.0-3.0320.4 Cross Slope (PAR)SF67327.5to $120 $8,09414886310ft feet .39331.5 Vertical Change REF10332.5to136111 10 ft feet 2.0-3.0331.9 Cross Slope (PAR)SF16333.6to $120 $1,93814886410ft feet 2.0-3.0341.5 Cross Slope (PAR)SF39345.6to $120 $4,67414886510ft feet 2.0-3.0351.8 Cross Slope (PAR)SF34355.4to $120 $4,10414886610ft feet 4.0-5.0355.4 Cross Slope (PAR)SF101366.0to $120 $12,08414886710ft feet .82356.9 Vertical Change REF10357.9to136112 10 ft feet 1.39363.9 Vertical Change REF10364.9to136113 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 679 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE / N DISTRICT BLVD Street Side TRAIN CROSSING (4735 DISTRICT BLVD) Survey Street Name Starting Street Name CORONA AVE End Street Name 1912191116 Run ID District Blvd 52 ID Sidewalk Width Priority feet 2.0-3.0366.0 Cross Slope (PAR)SF56371.9to $120 $6,72614886810ft feet 2.0-3.0379.7 Cross Slope (PAR)SF37383.6to $120 $4,44614886910ft feet383.6 Driveway397.4to165277 feet 2.83399.8 Vertical Change REF10400.8to136114 10 ft feet 2.0-3.0400.3 Cross Slope (PAR)SF149416.0to $120 $17,89814887010ft feet 4.0-5.0416.8 Cross Slope (PAR)SF35420.5to $120 $4,21814887110ft feet 2.0-3.0421.2 Cross Slope (PAR)SF37425.1to $120 $4,44614887210ft feet 4.0-5.0425.3 Cross Slope (PAR)SF28428.2to $120 $3,30614887310ft feet429.5 Driveway456.5to165278 feet -.38443.5 Vertical Change REF10444.5to136115 10 ft feet 2.0-3.0458.4 Cross Slope (PAR)SF10459.4to $120 $1,14014887410ft feet 2.0-3.0461.8 Cross Slope (PAR)SF46466.6to $120 $5,47214887510ft feet 2.0-3.0469.8 Cross Slope (PAR)SF55475.6to $120 $6,61214887610ft feet 3.0-4.0477.9 Cross Slope (PAR)SF16479.6to $120 $1,93814887710ft feet 2.0-3.0480.5 Cross Slope (PAR)SF50485.8to $120 $6,04214887810ft feet 3.0-4.0488.5 Cross Slope (PAR)SF454536.3to $120 $54,49214887910ft feet 2.0-3.0537.3 Cross Slope (PAR)SF68544.5to $120 $8,20814888010ft feet 4.0-5.0545.8 Cross Slope (PAR)SF96555.9to $120 $11,51414888110ft feet 2.0-3.0556.3 Cross Slope (PAR)SF104567.2to $120 $12,42614888210ft feet 2.0-3.0569.7 Cross Slope (PAR)SF99580.1to $120 $11,85614888310ft feet580.1 Cold Patch 39584.2to140360 10 ft feet 4.0-5.0586.7 Cross Slope (PAR)SF48591.8to $120 $5,81414888410ft feet 2.0-3.0592.3 Cross Slope (PAR)SF57598.3to $120 $6,84014888510ft feet598.5 Driveway642.3to165279 feet 3.0-4.0644.8 Cross Slope (PAR)SF10645.8to $120 $1,14014888610ft feet 3.0-4.0648.8 Cross Slope (PAR)SF50654.1to $120 $6,04214888710ft feet 2.0-3.0654.6 Cross Slope (PAR)SF108666.0to $120 $12,99614888810ft feet 3.0-4.0668.8 Cross Slope (PAR)SF15670.4to $120 $1,82414888910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 680 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE / N DISTRICT BLVD Street Side TRAIN CROSSING (4735 DISTRICT BLVD) Survey Street Name Starting Street Name CORONA AVE End Street Name 1912191116 Run ID District Blvd 52 ID Sidewalk Width Priority feet 2.0-3.0671.3 Cross Slope (PAR)SF46676.1to $120 $5,47214889010ft feet677.7 Driveway721.8to165280 feet677.7 Driveway735.3to165281 feet 2.0-3.0722.3 Cross Slope (Driveway)SF29725.3to $40 $1,14014889110ft feet 3.0-4.0728.9 Cross Slope (Driveway)SF58735.0to $40 $2,31814889210ft $320,226.00TOTAL COST FOR:DISTRICT BLVDNE / N side of Starting at:TRAIN CROSSING (4735 DISTRICT BLVD) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 681 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING (4825 DISTRICT BLVD) Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191107 Run ID District Blvd 67.75 ID Sidewalk Width Priority feet 2.0-3.01.4 Cross Slope (PAR)SF20222.7to $120 $24,28214889310ft feet 7.0-8.011.3 Running Slope REF2914.3to166467 10 ft feet 2.0-3.025.3 Cross Slope (PAR)SF8334.0to $120 $9,91814889410ft feet .2630.9 Vertical Change REF1031.9to136116 10 ft feet 4.0-5.037.4 Cross Slope (PAR)SF4742.3to $120 $5,58614889510ft feet 2.0-3.042.3 Cross Slope (PAR)SF1143.5to $120 $1,36814889610ft feet 3.0-4.051.4 Cross Slope (PAR)SF1452.9to $120 $1,71014889710ft feet 2.0-3.054.4 Cross Slope (PAR)SF2857.3to $120 $3,30614889810ft feet 3.0-4.059.5 Cross Slope (PAR)SF5865.6to $120 $6,95414889910ft feet 5.0-6.065.6 Cross Slope (PAR)SF2267.9to $120 $2,62214890010ft feet 2.0-3.069.3 Cross Slope (PAR)SF5875.4to $120 $6,95414890110ft feet 2.0-3.083.6 Cross Slope (PAR)SF4087.8to $120 $4,78814890210ft feet 2.0-3.090.2 Cross Slope (PAR)SF5395.8to $120 $6,38414890310ft feet 2.0-3.0100.5 Cross Slope (PAR)SF57106.5to $120 $6,84014890410ft feet 4.0-5.0106.5 Cross Slope (PAR)SF50111.8to $120 $6,04214890510ft feet 2.0-3.0114.3 Cross Slope (PAR)SF22116.6to $120 $2,62214890610ft feet .44114.6 Vertical Change REF10115.6to136117 10 ft feet .87127.4 Vertical Change SF10128.4to $75 $71313611810ft feet 2.0-3.0131.9 Cross Slope (PAR)SF51137.3to $120 $6,15614890710ft feet 2.0-3.0143.1 Cross Slope (PAR)SF64149.8to $120 $7,63814890810ft feet 4.0-5.0149.8 Cross Slope (PAR)SF13151.2to $120 $1,59614890910ft feet 3.0-4.0153.3 Cross Slope (PAR)SF20155.4to $120 $2,39414891010ft feet 2.0-3.0155.8 Cross Slope (PAR)SF222179.2to $120 $26,67614891110ft feet 4.0-5.0179.2 Cross Slope (PAR)SF32182.6to $120 $3,87614891210ft feet183.4 Driveway232.7to165282 feet -.26188.8 Vertical Change REF10189.8to136119 10 ft feet .81221.5 Vertical Change REF10222.5to136120 10 ft feet 2.68227.7 Vertical Change REF10228.7to136121 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 682 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING (4825 DISTRICT BLVD) Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912191107 Run ID District Blvd 67.75 ID Sidewalk Width Priority feet 3.0-4.0233.8 Cross Slope (PAR)SF61240.2to $120 $7,29614891310ft feet 2.0-3.0240.8 Cross Slope (PAR)SF12242.1to $120 $1,48214891410ft feet 2.0-3.0255.3 Cross Slope (PAR)SF17257.1to $120 $2,05214891510ft feet .48261.8 Vertical Change LF10262.8to $75 $71313612210ft feet .75318.8 Vertical Change SF10319.8to $75 $71313612310ft feet 1.18390.3 Vertical Change SF10391.3to $75 $71313612410ft feet -.33420.3 Vertical Change LF10421.3to $75 $71313612510ft feet 2.0-3.0431.5 Cross Slope (PAR)SF119444.0to $120 $14,25014891610ft feet 2.0-3.0446.4 Cross Slope (PAR)SF71453.9to $120 $8,55014891710ft feet 3.0-4.0456.9 Cross Slope (PAR)SF80465.3to $120 $9,57614891810ft feet 2.0-3.0467.7 Cross Slope (PAR)SF18469.6to $120 $2,16614891910ft feet 3.0-4.0471.8 Cross Slope (PAR)SF131485.6to $120 $15,73214892010ft feet485.7 Driveway514.0to165283 feet 2.0-3.0516.8 Cross Slope (PAR)SF304548.8to $120 $36,48014892110ft feet 2.0-3.0559.4 Cross Slope (PAR)SF68566.6to $120 $8,20814892210ft feet .28568.8 Vertical Change LF10569.8to $75 $71313612610ft $247,779.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING (4825 DISTRICT BLVD) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 683 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING (4949 DISTRICT BLVD) Survey Street Name Starting Street Name TRAIN CROSSING (4825 DISTRICT BLVD) End Street Name 1912191101 Run ID District Blvd 61.75 ID Sidewalk Width Priority feet 3.0-4.01.3 Cross Slope (PAR)SF14316.3to $120 $17,10014892310ft feet 5.0-6.016.3 Cross Slope (PAR)SF3820.3to $120 $4,56014892410ft feet 2.917.5 Vertical Change SF1018.5to $75 $71313612710ft feet 3.0-4.020.7 Cross Slope (PAR)SF1121.9to $120 $1,36814892510ft feet 3.0-4.024.2 Cross Slope (PAR)SF5630.1to $120 $6,72614892610ft feet 2.0-3.030.9 Cross Slope (PAR)SF13745.3to $120 $16,41614892710ft feet .6648.2 Vertical Change SF1049.2to $75 $71313612810ft feet 3.0-4.050.3 Cross Slope (PAR)SF9059.8to $120 $10,83014892810ft feet 2.0-3.059.8 Cross Slope (PAR)SF1060.8to $120 $1,14014892910ft feet 2.0-3.063.3 Cross Slope (PAR)SF5969.5to $120 $7,06814893010ft feet 4.0-5.072.2 Cross Slope (PAR)SF4877.2to $120 $5,70014893110ft feet 2.0-3.077.7 Cross Slope (PAR)SF215100.3to $120 $25,76414893210ft feet 3.0-4.0102.5 Cross Slope (PAR)SF46107.3to $120 $5,47214893310ft feet 2.0-3.0107.3 Cross Slope (PAR)SF238132.4to $120 $28,61414893410ft feet 4.0-5.0132.4 Cross Slope (PAR)SF26135.1to $120 $3,07814893510ft feet .26134.0 Vertical Change REF10135.0to136129 10 ft feet 3.0-4.0139.1 Cross Slope (PAR)SF128152.6to $120 $15,39014893610ft feet 2.0-3.0153.3 Cross Slope (PAR)SF157169.8to $120 $18,81014893710ft feet 4.0-5.0171.2 Cross Slope (PAR)SF49176.4to $120 $5,92814893810ft feet .27180.2 Vertical Change LF10181.2to $75 $71313613010ft feet 2.0-3.0183.8 Cross Slope (PAR)SF70191.2to $120 $8,43614893910ft feet 2.0-3.0194.9 Cross Slope (PAR)SF143210.0to $120 $17,21414894010ft feet 3.0-4.0214.4 Cross Slope (PAR)SF68221.6to $120 $8,20814894110ft feet 2.0-3.0222.0 Cross Slope (PAR)SF16223.7to $120 $1,93814894210ft feet 3.0-4.0230.3 Cross Slope (PAR)SF41234.6to $120 $4,90214894310ft feet -.48233.3 Vertical Change REF10234.3to136131 10 ft feet 5.0-6.0234.6 Cross Slope (PAR)SF53240.2to $120 $6,38414894410ft feet .28242.5 Vertical Change REF10243.5to136132 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 684 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING (4949 DISTRICT BLVD) Survey Street Name Starting Street Name TRAIN CROSSING (4825 DISTRICT BLVD) End Street Name 1912191101 Run ID District Blvd 61.75 ID Sidewalk Width Priority feet 4.0-5.0242.9 Cross Slope (PAR)SF82251.5to $120 $9,80414894510ft feet 2.0-3.0251.5 Cross Slope (PAR)SF189271.4to $120 $22,68614894610ft feet .64254.8 Vertical Change REF10255.8to136133 10 ft feet 2.0-3.0275.3 Cross Slope (PAR)SF41279.6to $120 $4,90214894710ft feet 2.0-3.0282.2 Cross Slope (PAR)SF16283.9to $120 $1,93814894810ft feet -.28283.3 Vertical Change REF10284.3to136135 10 ft feet 2.0-3.0286.1 Cross Slope (PAR)SF144301.3to $120 $17,32814894910ft feet 2.0-3.0305.8 Cross Slope (PAR)SF62312.3to $120 $7,41014895010ft feet 2.0-3.0315.0 Cross Slope (PAR)SF48320.1to $120 $5,81414895110ft feet 4.0-5.0321.4 Cross Slope (PAR)SF231345.7to $120 $27,70214895210ft feet -.28331.4 Vertical Change REF10332.4to136136 10 ft feet -.31340.9 Vertical Change REF10341.9to136137 10 ft feet 2.0-3.0346.8 Cross Slope (PAR)SF28349.7to $120 $3,30614895310ft feet .48350.5 Vertical Change LF10351.5to $75 $71313613810ft feet 2.0-3.0353.8 Cross Slope (PAR)SF21356.0to $120 $2,50814895410ft feet 3.0-4.0373.8 Cross Slope (PAR)SF14375.3to $120 $1,71014895510ft feet 2.0-3.0376.8 Cross Slope (PAR)SF22379.1to $120 $2,62214895610ft feet 2.0-3.0383.3 Cross Slope (PAR)SF40387.5to $120 $4,78814895710ft feet390.9 Driveway424.8to165284 feet 4.0-5.0425.3 Cross Slope (Driveway)SF106436.5to $40 $4,25614895810ft feet -.31427.0 Vertical Change REF10428.0to136139 10 ft feet 2.0-3.0437.0 Cross Slope (PAR)SF48442.1to $120 $5,81414895910ft feet 4.0-5.0442.1 Cross Slope (PAR)SF26444.8to $120 $3,07814896010ft feet 2.0-3.0446.1 Cross Slope (PAR)SF275475.0to $120 $32,94614896110ft feet 2.0-3.0477.1 Cross Slope (PAR)SF74484.9to $120 $8,89214896210ft feet 2.0-3.0487.0 Cross Slope (PAR)SF123499.9to $120 $14,70614896310ft feet 3.0-4.0502.1 Cross Slope (PAR)SF22504.4to $120 $2,62214896410ft feet 2.0-3.0504.4 Cross Slope (PAR)SF67511.5to $120 $8,09414896510ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 685 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE DISTRICT BLVD Street Side TRAIN CROSSING (4949 DISTRICT BLVD) Survey Street Name Starting Street Name TRAIN CROSSING (4825 DISTRICT BLVD) End Street Name 1912191101 Run ID District Blvd 61.75 ID Sidewalk Width Priority feet .38505.8 Vertical Change REF10506.8to136140 10 ft feet 4.0-5.0511.5 Cross Slope (PAR)SF55517.3to $120 $6,61214896610ft feet 2.0-3.0517.3 Cross Slope (PAR)SF10518.4to $120 $1,25414896710ft feet 4.0-5.0520.3 Cross Slope (PAR)SF52525.8to $120 $6,27014896810ft feet 2.0-3.0531.4 Cross Slope (PAR)SF13532.8to $120 $1,59614896910ft feet 5.0-6.0537.8 Running Slope SF10538.8to $120 $1,14016646810ft feet 3.0-4.0540.3 Cross Slope (PAR)SF83549.0to $120 $9,91814897010ft $443,612.00TOTAL COST FOR:DISTRICT BLVDNEside of Starting at:TRAIN CROSSING (4949 DISTRICT BLVD) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 686 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW DISTRICT BLVD Street Side TRAIN CROSSING (AFTER DISTRICT BLVD) Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1912190922 Run ID District Blvd 55 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF111.1to $120 $1,28714924710ft feet 2.0-3.01.1 Cross Slope (PAR)SF253.7to $120 $3,04214924810ft feet .975.9 Vertical Change SF106.9to $75 $73113621310ft feet 4.0-5.09.0 Cross Slope (PAR)SF7716.9to $120 $9,24314924910ft feet 2.0-3.016.9 Cross Slope (PAR)SF4821.8to $120 $5,73314925010ft feet 2.0-3.031.0 Cross Slope (PAR)SF1332.3to $120 $1,52114925110ft feet 2.0-3.045.3 Cross Slope (PAR)SF11557.1to $120 $13,80614925210ft feet 2.0-3.063.3 Cross Slope (PAR)SF1364.6to $120 $1,52114925310ft feet 2.0-3.077.7 Cross Slope (PAR)SF1579.2to $120 $1,75514925410ft feet 2.0-3.096.0 Cross Slope (PAR)SF1997.9to $120 $2,22314925510ft feet 2.0-3.0115.4 Cross Slope (PAR)SF364152.7to $120 $43,64114925610ft feet 2.0-3.0155.0 Cross Slope (PAR)SF33158.4to $120 $3,97814925710ft feet 3.0-4.0163.5 Cross Slope (PAR)SF11164.6to $120 $1,28714925810ft feet 2.0-3.0166.6 Cross Slope (PAR)SF99176.8to $120 $11,93414925910ft feet 4.0-5.0178.2 Cross Slope (PAR)SF20180.2to $120 $2,34014926010ft feet 3.0-4.0183.0 Cross Slope (Driveway)SF10184.0to $40 $39014926110ft feet 3.0-4.0186.3 Cross Slope (Driveway)SF20188.4to $40 $81914926210ft feet 2.0-3.0188.4 Cross Slope (Driveway)SF82196.8to $40 $3,27614926310ft feet 4.0-5.0197.3 Cross Slope (Driveway)SF124210.0to $40 $4,95314926410ft feet 2.0-3.0210.0 Cross Slope (Driveway)SF62216.4to $40 $2,49614926510ft feet 4.0-5.0218.1 Cross Slope (PAR)SF26220.8to $120 $3,15914926610ft feet 2.0-3.0223.3 Cross Slope (PAR)SF85232.0to $120 $10,17914926710ft feet 2.0-3.0237.5 Cross Slope (PAR)SF14238.9to $120 $1,63814926810ft $130,952.25TOTAL COST FOR:DISTRICT BLVDSWside of Starting at:TRAIN CROSSING (AFTER DISTRICT BLVD) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 687 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side 2120 E 25TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911221105 Run ID E 25Th St 61.5 ID Sidewalk Width Priority feet 3.0-4.01.1 Cross Slope (PAR)SF13514.6to $120 $16,20014262110ft feet 2.0-3.016.4 Cross Slope (PAR)SF13830.2to $120 $16,56014262210ft feet 2.0-3.033.4 Cross Slope (PAR)SF9943.3to $120 $11,88014262310ft feet 2.0-3.046.3 Cross Slope (PAR)SF19565.8to $120 $23,40014262410ft feet 4.0-5.069.6 Cross Slope (PAR)SF8678.2to $120 $10,32014262510ft feet79.0 Driveway95.1to164684 feet 3.0-4.096.7 Cross Slope (PAR)SF1798.4to $120 $2,04014262610ft feet -.5497.4 Vertical Change REF1098.4to133798 10 ft feet 2.0-3.098.4 Cross Slope (PAR)SF87107.1to $120 $10,44014262710ft feet 2.0-3.0111.3 Cross Slope (PAR)SF30114.3to $120 $3,60014262810ft feet .66114.9 Vertical Change SF10115.9to $75 $75013379910ft feet 2.0-3.0121.0 Cross Slope (PAR)SF68127.8to $120 $8,16014262910ft feet 2.0-3.0132.4 Cross Slope (PAR)SF19134.3to $120 $2,28014263010ft feet 4.0-5.0138.0 Cross Slope (PAR)SF33141.3to $120 $3,96014263110ft feet -.87141.8 Vertical Change REF10142.8to133800 10 ft feet 6.0-7.0141.8 Cross Slope (PAR)SF22144.0to $120 $2,64014263210ft feet 5.0-6.0144.0 Cross Slope (PAR)SF47148.7to $120 $5,64014263310ft feet 3.0-4.0148.7 Cross Slope (PAR)SF29151.6to $120 $3,48014263410ft feet 2.0-3.0152.3 Cross Slope (PAR)SF43156.6to $120 $5,16014263510ft feet 4.0-5.0156.8 Cross Slope (PAR)SF84165.2to $120 $10,08014263610ft feet 2.0-3.0165.2 Cross Slope (PAR)SF17166.9to $120 $2,04014263710ft feet .67166.1 Vertical Change REF10167.1to133801 10 ft feet 2.0-3.0176.9 Cross Slope (PAR)SF204197.3to $120 $24,48014263810ft feet 2.0-3.0201.2 Cross Slope (PAR)SF150216.2to $120 $18,00014263910ft feet217.8 Driveway235.5to164685 feet 2.89230.2 Vertical Change REF10231.2to133802 10 ft feet 1.63234.5 Vertical Change REF10235.5to133803 10 ft feet 4.0-5.0235.5 Cross Slope (Driveway)SF43239.8to $40 $1,72014264010ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 688 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side 2120 E 25TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911221105 Run ID E 25Th St 61.5 ID Sidewalk Width Priority feet239.8 Driveway282.6to164686 feet -.27267.9 Vertical Change REF10268.9to133804 10 ft feet 4.0-5.0282.8 Cross Slope (Driveway)SF284311.2to $40 $11,36014264110ft feet 2.0-3.0311.2 Cross Slope (PAR)SF164327.6to $120 $19,68014264210ft feet 2.0-3.0329.7 Cross Slope (PAR)SF261355.8to $120 $31,32014264310ft feet 2.0-3.0359.8 Cross Slope (PAR)SF70366.8to $120 $8,40014264410ft feet 4.0-5.0366.8 Cross Slope (PAR)SF46371.4to $120 $5,52014264510ft feet 2.95371.1 Vertical Change REF10372.1to133805 10 ft feet 2.0-3.0371.7 Cross Slope (PAR)SF314403.1to $120 $37,68014264610ft feet 2.0-3.0415.5 Cross Slope (PAR)SF52420.7to $120 $6,24014264710ft feet 2.0-3.0428.1 Cross Slope (PAR)SF222450.3to $120 $26,64014264810ft feet .34432.7 Vertical Change REF10433.7to133806 10 ft feet .77446.9 Vertical Change REF10447.9to133807 10 ft feet 2.0-3.0453.2 Cross Slope (PAR)SF161469.3to $120 $19,32014264910ft feet472.3 Driveway569.5to164687 feet -.3504.0 Vertical Change REF10505.0to133808 10 ft feet .26506.4 Vertical Change REF10507.4to133809 10 ft feet .26512.3 Vertical Change REF10513.3to133810 10 ft feet .31535.5 Vertical Change REF10536.5to133811 10 ft feet 2.0-3.0569.7 Cross Slope (Driveway)SF116581.3to $40 $4,64014265010ft feet581.3 Driveway626.4to164688 feet -.27594.9 Vertical Change REF10595.9to133812 10 ft feet -.33622.4 Vertical Change REF10623.4to133814 10 ft feet 3.0-4.0626.4 Cross Slope (Driveway)SF12627.6to $40 $48014265110ft feet 2.0-3.0627.6 Cross Slope (PAR)SF145642.1to $120 $17,40014265210ft feet 2.0-3.0646.0 Cross Slope (PAR)SF46650.6to $120 $5,52014265310ft feet 3.0-4.0652.8 Cross Slope (PAR)SF12654.0to $120 $1,44014265410ft feet 2.0-3.0654.0 Cross Slope (PAR)SF189672.9to $120 $22,68014265510ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 689 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side 2120 E 25TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911221105 Run ID E 25Th St 61.5 ID Sidewalk Width Priority feet 4.0-5.0672.9 Cross Slope (PAR)SF32676.1to $120 $3,84014265610ft feet 2.0-3.0676.7 Cross Slope (PAR)SF60682.7to $120 $7,20014265710ft feet 4.0-5.0682.7 Cross Slope (PAR)SF724755.1to $120 $86,88014265810ft feet -.54737.6 Vertical Change REF10738.6to133815 10 ft $499,070.00TOTAL COST FOR:E 25TH STSside of Starting at:2120 E 25TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 690 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side S ALAMEDA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221043 Run ID E 25Th St 57.75 ID Sidewalk Width Priority feet 3.0-4.00.2 Cross Slope (PAR)SF14415.4to $120 $17,32814272010ft feet -.311.5 Vertical Change REF102.5to133851 10 ft feet 2.139.6 Vertical Change REF1010.6to133852 10 ft feet 5.0-6.017.0 Cross Slope (PAR)SF7324.7to $120 $8,77814272110ft feet 3.0-4.024.7 Cross Slope (PAR)SF18143.7to $120 $21,66014272210ft feet .3242.4 Vertical Change REF1043.4to133853 10 ft feet 3.0-4.046.3 Cross Slope (PAR)SF25673.2to $120 $30,66614272310ft feet .4464.6 Vertical Change REF1065.6to133854 10 ft feet .4573.9 Vertical Change LF1074.9to $75 $71313385510ft feet 4.0-5.075.4 Cross Slope (PAR)SF12388.4to $120 $14,82014272410ft feet -.4184.2 Vertical Change REF1085.2to133856 10 ft feet 6.0-7.088.9 Cross Slope (PAR)SF1390.3to $120 $1,59614272510ft feet 5.0-6.090.3 Cross Slope (PAR)SF5496.0to $120 $6,49814272610ft feet .3492.6 Vertical Change REF1093.6to133857 10 ft feet 3.0-4.096.0 Cross Slope (PAR)SF2198.2to $120 $2,50814272710ft feet 3.0-4.0101.4 Cross Slope (PAR)SF10102.4to $120 $1,14014272810ft feet 2.0-3.0102.7 Cross Slope (PAR)SF27105.5to $120 $3,19214272910ft feet 3.0-4.0116.3 Cross Slope (PAR)SF16118.0to $120 $1,93814273010ft feet 2.0-3.0118.0 Cross Slope (PAR)SF14119.5to $120 $1,71014273110ft feet 2.0-3.0123.5 Cross Slope (PAR)SF91133.1to $120 $10,94414273210ft feet .28132.8 Vertical Change REF10133.8to133858 10 ft feet 4.0-5.0133.1 Cross Slope (PAR)SF163150.3to $120 $19,60814273310ft feet -.28141.9 Vertical Change REF10142.9to133859 10 ft feet 2.0-3.0151.0 Cross Slope (PAR)SF11152.2to $120 $1,36814273410ft feet155.7 Driveway199.6to164700 feet -.32159.8 Vertical Change REF10160.8to133860 10 ft feet 2.0-3.0205.9 Cross Slope (PAR)SF74213.7to $120 $8,89214273510ft feet .27212.6 Vertical Change REF10213.6to133862 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 691 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side S ALAMEDA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221043 Run ID E 25Th St 57.75 ID Sidewalk Width Priority feet 3.0-4.0215.8 Cross Slope (PAR)SF17217.6to $120 $2,05214273610ft feet 2.0-3.0218.8 Cross Slope (PAR)SF54224.5to $120 $6,49814273710ft feet 4.0-5.0224.5 Cross Slope (PAR)SF107235.8to $120 $12,88214273810ft feet -.31233.6 Vertical Change REF10234.6to133863 10 ft feet 2.0-3.0235.9 Cross Slope (PAR)SF38239.9to $120 $4,56014273910ft feet 2.0-3.0264.3 Cross Slope (PAR)SF19266.3to $120 $2,28014274010ft feet 2.0-3.0297.5 Cross Slope (PAR)SF37301.4to $120 $4,44614274110ft feet 3.0-4.0324.2 Cross Slope (PAR)SF17326.0to $120 $2,05214274210ft feet 2.0-3.0332.3 Cross Slope (PAR)SF29335.3to $120 $3,42014274310ft feet 2.0-3.0339.2 Cross Slope (PAR)SF39343.3to $120 $4,67414274410ft feet 4.0-5.0343.3 Cross Slope (PAR)SF147358.8to $120 $17,67014274510ft feet 2.0-3.0359.7 Cross Slope (PAR)SF14361.2to $120 $1,71014274610ft feet -.3360.5 Vertical Change REF10361.5to133864 10 ft feet 2.0-3.0367.0 Cross Slope (PAR)SF121379.7to $120 $14,47814274710ft feet 4.0-5.0379.7 Cross Slope (PAR)SF320413.4to $120 $38,41814274810ft feet397.5 Continuous Width SF10398.5to $120 $1,14016703110ft feet .34402.8 Vertical Change REF10403.8to133865 10 ft feet 2.0-3.0413.4 Cross Slope (PAR)SF20415.5to $120 $2,39414274910ft feet 7.0-8.0414.9 Running Slope REF22417.2to166425 10 ft feet 5.0-6.0418.5 Running Slope SF10419.5to $120 $1,14016642610ft feet420.8 Driveway466.8to164701 feet420.8 Driveway506.9to164702 feet 3.0-4.0467.4 Cross Slope (Driveway)SF270495.8to $40 $10,79214275010ft feet .37467.9 Vertical Change REF10468.9to133866 10 ft feet .35473.4 Vertical Change REF10474.4to133867 10 ft feet -.32485.7 Vertical Change REF10486.7to133868 10 ft feet .45492.5 Vertical Change REF10493.5to133869 10 ft feet -.38496.8 Vertical Change REF10497.8to133870 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 692 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side S ALAMEDA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221043 Run ID E 25Th St 57.75 ID Sidewalk Width Priority feet 2.0-3.0497.0 Cross Slope (Driveway)SF11498.2to $40 $45614275110ft feet 5.0-6.0500.9 Running Slope REF14502.4to166427 10 ft feet 6.0-7.0502.9 Running Slope REF13504.3to166428 10 ft feet 8.0-9.0505.0 Running Slope REF10506.0to166429 10 ft feet 6.0-7.0505.3 Cross Slope (Driveway)SF10506.3to $40 $38014275210ft $284,800.50TOTAL COST FOR:E 25TH STSside of Starting at:S ALAMEDA ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 693 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221222 Run ID E 25Th St 103.25 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF687.2to $120 $8,20814241110ft feet 2.0-3.017.2 Cross Slope (PAR)SF1719.0to $120 $2,05214241210ft feet .2722.2 Vertical Change LF1023.2to $75 $71313371110ft feet 2.0-3.028.4 Cross Slope (PAR)SF2931.5to $120 $3,53414241310ft feet 2.0-3.044.2 Cross Slope (PAR)SF7752.3to $120 $9,23414241410ft feet 2.0-3.055.3 Cross Slope (PAR)SF5761.3to $120 $6,84014241510ft feet 2.0-3.071.4 Cross Slope (PAR)SF6277.9to $120 $7,41014241610ft feet 2.0-3.093.1 Cross Slope (PAR)SF6199.5to $120 $7,29614241710ft feet101.0 Driveway160.1to164640 feet .35126.8 Vertical Change REF10127.8to133712 10 ft feet161.8 Driveway183.0to164641 feet .28171.5 Vertical Change REF10172.5to133713 10 ft feet 3.0-4.0183.0 Cross Slope (Driveway)SF11184.2to $40 $45614241810ft feet 2.0-3.0184.2 Cross Slope (PAR)SF25186.8to $120 $2,96414241910ft feet 2.0-3.0191.4 Cross Slope (PAR)SF284221.3to $120 $34,08614242010ft feet 2.0-3.0229.7 Cross Slope (PAR)SF28232.6to $120 $3,30614242110ft feet235.4 Driveway256.3to164642 feet 2.0-3.0268.3 Cross Slope (PAR)SF58274.4to $120 $6,95414242210ft feet 2.0-3.0276.7 Cross Slope (PAR)SF32280.1to $120 $3,87614242310ft feet280.1 Driveway296.7to164643 feet .36283.3 Vertical Change REF10284.3to133714 10 ft feet -.72293.5 Vertical Change REF10294.5to133715 10 ft feet 2.0-3.0297.3 Cross Slope (Driveway)SF60303.6to $40 $2,39414242410ft feet 2.0-3.0309.4 Cross Slope (PAR)SF98319.7to $120 $11,74214242510ft feet 4.0-5.0319.7 Cross Slope (PAR)SF148335.3to $120 $17,78414242610ft feet 2.0-3.0335.3 Cross Slope (PAR)SF34338.9to $120 $4,10414242710ft feet 2.0-3.0342.8 Cross Slope (PAR)SF62349.3to $120 $7,41014242810ft feet 4.0-5.0349.3 Cross Slope (PAR)SF258376.5to $120 $31,00814242910ft feet .52377.5 Vertical Change SF10378.5to $75 $71313371610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 694 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221222 Run ID E 25Th St 103.25 ID Sidewalk Width Priority feet 2.0-3.0380.1 Cross Slope (PAR)SF10381.2to $120 $1,25414243010ft feet 3.0-4.0385.2 Cross Slope (PAR)SF10386.3to $120 $1,25414243110ft feet 5.0-6.0386.6 Cross Slope (PAR)SF12387.9to $120 $1,48214243210ft feet 6.0-7.0387.9 Cross Slope (PAR)SF42392.3to $120 $5,01614243310ft feet .27388.1 Vertical Change REF10389.1to133717 10 ft feet 5.0-6.0393.2 Cross Slope (PAR)SF18395.1to $120 $2,16614243410ft feet 5.0-6.0397.5 Cross Slope (PAR)SF25400.1to $120 $2,96414243510ft feet 3.0-4.0403.3 Cross Slope (PAR)SF10404.3to $120 $1,14014243610ft feet 2.0-3.0407.5 Cross Slope (PAR)SF62414.0to $120 $7,41014243710ft feet .58409.8 Vertical Change REF10410.8to133718 10 ft feet 4.0-5.0414.0 Cross Slope (PAR)SF42418.4to $120 $5,01614243810ft feet418.4 Driveway496.3to164644 feet -.33467.9 Vertical Change REF10468.9to133719 10 ft feet 2.24476.3 Vertical Change REF10477.3to133720 10 ft feet .29491.3 Vertical Change REF10492.3to133721 10 ft feet 2.0-3.0496.3 Cross Slope (Driveway)SF14497.8to $40 $57014243910ft feet 2.0-3.0510.8 Cross Slope (PAR)SF101521.4to $120 $12,08414244010ft feet .54524.7 Vertical Change REF10525.7to133722 10 ft feet 3.0-4.0524.8 Cross Slope (PAR)SF187544.5to $120 $22,45814244110ft feet 5.0-6.0545.6 Cross Slope (PAR)SF22547.9to $120 $2,62214244210ft feet 3.0-4.0550.6 Cross Slope (PAR)SF55556.4to $120 $6,61214244310ft feet 2.0-3.0556.9 Cross Slope (PAR)SF14558.4to $120 $1,71014244410ft feet 4.0-5.0559.8 Cross Slope (PAR)SF82568.4to $120 $9,80414244510ft feet 2.0-3.0568.4 Cross Slope (PAR)SF12569.7to $120 $1,48214244610ft feet 2.0-3.0575.3 Cross Slope (PAR)SF66582.2to $120 $7,86614244710ft feet588.9 Driveway616.8to164645 feet .34594.9 Vertical Change REF10595.9to133723 10 ft feet 2.86603.4 Vertical Change REF10604.4to133724 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 695 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221222 Run ID E 25Th St 103.25 ID Sidewalk Width Priority feet 2.0-3.0620.8 Cross Slope (PAR)SF131634.6to $120 $15,73214244810ft feet .69633.6 Vertical Change REF10634.6to133725 10 ft feet 3.0-4.0637.6 Cross Slope (PAR)SF37641.5to $120 $4,44614244910ft feet 2.0-3.0641.5 Cross Slope (PAR)SF44646.1to $120 $5,24414245010ft feet646.8 Driveway691.1to164646 feet .7655.2 Vertical Change REF9656.2to133726 10 ft feet 2.47685.9 Vertical Change REF10686.9to133727 10 ft feet 4.0-5.0691.1 Cross Slope (Driveway)SF29694.2to $40 $1,17814245110ft feet 2.0-3.0694.2 Cross Slope (PAR)SF69701.5to $120 $8,32214245210ft feet 5.0-6.0700.3 Running Slope REF10701.3to166423 10 ft feet702.3 Driveway732.5to164647 feet .33719.7 Vertical Change REF10720.7to133728 10 ft feet 3.0-4.0732.5 Cross Slope (Driveway)SF98742.8to $40 $3,91414245310ft feet 2.0-3.0743.2 Cross Slope (PAR)SF19745.2to $120 $2,28014245410ft feet 2.0-3.0756.5 Cross Slope (PAR)SF41760.8to $120 $4,90214245510ft feet 2.0-3.0763.8 Cross Slope (PAR)SF166781.3to $120 $19,95014245610ft feet 4.0-5.0782.0 Cross Slope (PAR)SF30785.2to $120 $3,64814245710ft feet786.8 Driveway840.8to164648 feet 3.31817.2 Vertical Change REF10818.2to133730 10 ft feet 2.76818.9 Vertical Change REF10819.9to133731 10 ft feet842.1 Driveway857.1to164649 feet -.55850.6 Vertical Change REF10851.6to133732 10 ft feet 3.0-4.0857.1 Cross Slope (Driveway)SF47862.0to $40 $1,86214245810ft feet 1.04859.6 Vertical Change REF10860.6to133733 10 ft feet 2.0-3.0862.0 Cross Slope (PAR)SF68869.2to $120 $8,20814245910ft feet 4.0-5.0869.2 Cross Slope (PAR)SF380909.2to $120 $45,60014246010ft feet .31878.3 Vertical Change REF10879.3to133734 10 ft feet .44903.8 Vertical Change REF10904.8to133735 10 ft feet 2.0-3.0918.0 Cross Slope (PAR)SF55923.8to $120 $6,61214246110ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 696 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221222 Run ID E 25Th St 103.25 ID Sidewalk Width Priority feet925.3 Driveway957.5to164650 feet 6.0-7.0957.6 Cross Slope (Driveway)SF11958.8to $40 $45614246210ft feet 4.0-5.0960.8 Cross Slope (PAR)SF114972.8to $120 $13,68014246310ft feet 2.0-3.0972.8 Cross Slope (PAR)SF60979.1to $120 $7,18214246410ft feet 4.0-5.0979.1 Cross Slope (PAR)SF34982.7to $120 $4,10414246510ft feet 2.0-3.0983.0 Cross Slope (PAR)SF130996.7to $120 $15,61814246610ft feet 4.0-5.0996.7 Cross Slope (PAR)SF1071008.0to $120 $12,88214246710ft feet -.341009.0 Vertical Change LF101010.0to $75 $71313373610ft feet 2.0-3.01016.8 Cross Slope (PAR)SF1761035.3to $120 $21,09014246810ft feet 3.0-4.01037.4 Cross Slope (PAR)SF2131059.8to $120 $25,53614246910ft feet1061.0 Driveway1106.3to164651 feet .471072.5 Vertical Change REF101073.5to133737 10 ft feet .451092.6 Vertical Change REF101093.6to133738 10 ft feet 14.0-15.01110.5 Cross Slope (PAR)SF811119.0to $120 $9,69014247010ft feet .331111.6 Vertical Change REF101112.6to133740 10 ft feet -.291118.5 Vertical Change REF101119.5to133741 10 ft feet 5.0-6.01126.3 Cross Slope (PAR)SF601132.6to $120 $7,18214247110ft feet 6.0-7.01132.8 Cross Slope (PAR)SF181134.7to $120 $2,16614247210ft feet 8.0-9.01135.5 Cross Slope (PAR)SF451140.2to $120 $5,35814247310ft feet 6.0-7.01141.4 Cross Slope (PAR)SF101142.5to $120 $1,25414247410ft feet 2.0-3.01144.3 Cross Slope (PAR)SF141145.8to $120 $1,71014247510ft feet1147.2 Driveway1149.3to164652 feet 4.0-5.01149.7 Cross Slope (PAR)SF1151161.8to $120 $13,79414247610ft feet 1.191158.9 Vertical Change REF101159.9to133742 10 ft feet 2.0-3.01161.8 Cross Slope (PAR)SF981172.1to $120 $11,74214247710ft feet1172.5 Driveway1204.8to164653 feet -.331190.9 Vertical Change REF101191.9to133743 10 ft feet 5.0-6.01204.8 Cross Slope (Driveway)SF481209.8to $40 $1,90014247810ft feet 3.0-4.01212.0 Cross Slope (PAR)SF791220.3to $120 $9,46214247910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 697 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221222 Run ID E 25Th St 103.25 ID Sidewalk Width Priority feet 3.0-4.01222.9 Cross Slope (PAR)SF271225.7to $120 $3,19214248010ft feet 3.0-4.01227.8 Cross Slope (PAR)SF1531243.9to $120 $18,35414248110ft feet 5.0-6.01245.4 Cross Slope (PAR)SF1221258.2to $120 $14,59214248210ft feet -.831253.0 Vertical Change REF101254.0to133744 10 ft feet1258.2 Driveway1282.2to164654 feet 6.0-7.01282.9 Cross Slope (PAR)SF131284.3to $120 $1,59614248310ft feet 5.0-6.01284.8 Cross Slope (PAR)SF951294.8to $120 $11,40014248410ft feet 3.0-4.01294.8 Cross Slope (PAR)SF361298.6to $120 $4,33214248510ft feet .261296.9 Vertical Change REF101297.9to133745 10 ft feet 2.0-3.01298.8 Cross Slope (PAR)SF1581315.4to $120 $18,92414248610ft feet .311301.1 Vertical Change REF101302.1to133746 10 ft feet .311317.7 Vertical Change LF101318.7to $75 $71313374710ft feet 5.0-6.01319.4 Cross Slope (PAR)SF661326.3to $120 $7,86614248710ft feet1326.3 Driveway1350.2to164655 feet 2.0-3.01351.2 Cross Slope (PAR)SF241353.7to $120 $2,85014248810ft feet 4.0-5.01354.6 Cross Slope (PAR)SF1181367.0to $120 $14,13614248910ft feet 3.0-4.01369.9 Cross Slope (PAR)SF141371.4to $120 $1,71014249010ft feet 2.0-3.01371.4 Cross Slope (PAR)SF511376.8to $120 $6,15614249110ft feet1376.8 Driveway1403.3to164656 feet 1.421386.1 Vertical Change REF101387.1to133748 10 ft feet 2.0-3.01405.5 Cross Slope (PAR)SF141407.0to $120 $1,71014249210ft feet 2.0-3.01409.3 Cross Slope (PAR)SF1441424.5to $120 $17,32814249310ft feet .271415.1 Vertical Change REF101416.1to133749 10 ft feet 4.0-5.01424.8 Cross Slope (PAR)SF641431.5to $120 $7,63814249410ft feet 3.0-4.01433.9 Cross Slope (PAR)SF371437.8to $120 $4,44614249510ft feet1437.8 Driveway1458.4to164657 feet .271438.1 Vertical Change REF101439.1to133750 10 ft feet 2.0-3.01459.5 Cross Slope (PAR)SF691466.8to $120 $8,32214249610ft feet 4.0-5.01467.1 Cross Slope (PAR)SF641473.8to $120 $7,63814249710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 698 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221222 Run ID E 25Th St 103.25 ID Sidewalk Width Priority feet 2.0-3.01473.9 Cross Slope (PAR)SF561479.8to $120 $6,72614249810ft feet 2.0-3.01483.5 Cross Slope (PAR)SF2351508.2to $120 $28,15814249910ft feet 2.0-3.01511.5 Cross Slope (PAR)SF2551538.3to $120 $30,55214250010ft feet 4.0-5.01541.3 Cross Slope (PAR)SF391545.4to $120 $4,67414250110ft feet 2.0-3.01545.7 Cross Slope (PAR)SF1051556.7to $120 $12,54014250210ft feet 4.0-5.01556.7 Cross Slope (PAR)SF1051567.7to $120 $12,54014250310ft feet1567.7 Driveway1578.5to164658 feet 2.0-3.01579.4 Cross Slope (PAR)SF1881599.2to $120 $22,57214250410ft feet 2.291594.6 Vertical Change REF101595.6to133752 10 ft feet 10.0-11.01604.8 Cross Slope (PAR)SF1531620.9to $120 $18,35414250510ft feet1620.9 Driveway1629.8to164659 feet 2.0-3.01633.8 Cross Slope (PAR)SF1451649.1to $120 $17,44214250610ft feet 2.0-3.01653.3 Cross Slope (PAR)SF231655.7to $120 $2,73614250710ft feet 2.0-3.01669.3 Cross Slope (PAR)SF1831688.6to $120 $22,00214250810ft feet 4.0-5.01688.6 Cross Slope (PAR)SF491693.8to $120 $5,92814250910ft feet1689.3 Continuous Width REF101690.3to166987 10 ft feet 2.0-3.01693.8 Cross Slope (PAR)SF781702.0to $120 $9,34814251010ft $908,884.00TOTAL COST FOR:E 25TH STNside of Starting at:S SANTA FE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 699 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name S ALAMEDA ST End Street Name 1911221232 Run ID E 25Th St 54 ID Sidewalk Width Priority feet 2.0-3.01.1 Cross Slope (PAR)SF8710.3to $120 $10,48814237310ft feet 4.0-5.010.3 Cross Slope (PAR)SF9420.2to $120 $11,28614237410ft feet 2.0-3.020.2 Cross Slope (PAR)SF2823.1to $120 $3,30614237510ft feet 4.0-5.024.3 Cross Slope (PAR)SF4228.7to $120 $5,01614237610ft feet 4.0-5.031.8 Cross Slope (PAR)SF11844.2to $120 $14,13614237710ft feet 2.0-3.045.3 Cross Slope (PAR)SF8854.6to $120 $10,60214237810ft feet 2.0646.1 Vertical Change REF1047.1to133701 10 ft feet 1.2153.8 Vertical Change REF1054.8to133702 10 ft feet 2.0-3.057.1 Cross Slope (PAR)SF4261.5to $120 $5,01614237910ft feet 2.0-3.065.3 Cross Slope (PAR)SF1466.8to $120 $1,71014238010ft feet 2.0-3.075.0 Cross Slope (PAR)SF8984.4to $120 $10,71614238110ft feet 3.486.7 Vertical Change SF1087.7to $75 $71313370310ft feet 2.0-3.088.1 Cross Slope (PAR)SF155104.4to $120 $18,58214238210ft feet 1.4994.9 Vertical Change REF1095.9to133704 10 ft feet 4.0-5.0104.7 Cross Slope (PAR)SF62111.2to $120 $7,41014238310ft feet 2.0-3.0111.3 Cross Slope (PAR)SF84120.1to $120 $10,03214238410ft feet 4.0-5.0120.1 Cross Slope (PAR)SF37124.0to $120 $4,44614238510ft feet 2.0-3.0124.0 Cross Slope (PAR)SF212146.3to $120 $25,42214238610ft feet .36126.9 Vertical Change REF10127.9to133705 10 ft feet 4.0-5.0147.3 Cross Slope (PAR)SF76155.3to $120 $9,12014238710ft feet 1.01153.0 Vertical Change REF10154.0to133706 10 ft feet 2.0-3.0156.2 Cross Slope (PAR)SF14157.7to $120 $1,71014238810ft feet .39159.6 Vertical Change REF10160.6to133707 10 ft feet 2.0-3.0160.4 Cross Slope (PAR)SF88169.7to $120 $10,60214238910ft feet 2.0-3.0172.8 Cross Slope (PAR)SF390213.8to $120 $46,74014239010ft feet 3.0-4.0217.3 Cross Slope (PAR)SF180236.2to $120 $21,54614239110ft feet .36217.8 Vertical Change REF10218.8to133708 10 ft feet236.2 Driveway256.1to164638 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 700 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 25TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name S ALAMEDA ST End Street Name 1911221232 Run ID E 25Th St 54 ID Sidewalk Width Priority feet 4.0-5.0257.8 Cross Slope (PAR)SF112269.6to $120 $13,45214239210ft feet261.3 Continuous Width REF10262.3to167793 10 ft feet 2.0-3.0269.6 Cross Slope (PAR)SF86278.7to $120 $10,37414239310ft feet 2.0-3.0286.8 Cross Slope (PAR)SF98297.1to $120 $11,74214239410ft feet 2.0-3.0300.8 Cross Slope (PAR)SF326335.1to $120 $39,10214239510ft feet 3.0-4.0337.3 Cross Slope (PAR)SF57343.3to $120 $6,84014239610ft feet 2.0-3.0343.4 Cross Slope (PAR)SF15345.0to $120 $1,82414239710ft feet 2.0-3.0347.8 Cross Slope (PAR)SF22350.1to $120 $2,62214239810ft feet 4.0-5.0350.1 Cross Slope (PAR)SF47355.0to $120 $5,58614239910ft feet 2.0-3.0356.8 Cross Slope (PAR)SF67363.8to $120 $7,98014240010ft feet370.3 Continuous Width REF10371.3to167818 10 ft feet 3.0-4.0371.3 Cross Slope (PAR)SF32374.7to $120 $3,87614240110ft feet -.32372.9 Vertical Change REF10373.9to133709 10 ft feet 2.0-3.0375.2 Cross Slope (PAR)SF185394.7to $120 $22,23014240210ft feet 2.0-3.0401.5 Cross Slope (PAR)SF126414.8to $120 $15,16214240310ft feet 1.09414.0 Vertical Change REF10415.0to133710 10 ft feet415.9 Driveway456.6to164639 feet 3.0-4.0457.3 Cross Slope (Driveway)SF22459.6to $40 $87414240410ft feet 2.0-3.0459.6 Cross Slope (PAR)SF429504.8to $120 $51,52814240510ft feet479.6 Continuous Width REF10480.6to167811 10 ft feet 2.0-3.0508.8 Cross Slope (PAR)SF98519.1to $120 $11,74214240610ft feet 3.0-4.0521.7 Cross Slope (PAR)SF124534.8to $120 $14,93414240710ft feet 2.0-3.0535.1 Cross Slope (PAR)SF188554.9to $120 $22,57214240810ft feet 2.0-3.0558.2 Cross Slope (PAR)SF27561.0to $120 $3,19214240910ft feet 4.0-5.0566.1 Cross Slope (PAR)SF37570.0to $120 $4,44614241010ft $478,676.50TOTAL COST FOR:E 25TH STNside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 701 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name 2120 E 25TH ST End Street Name 1911221057 Run ID E 25Th St 77 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF141.4to $120 $1,68014265910ft feet 2.0-3.012.3 Cross Slope (PAR)SF6919.2to $120 $8,28014266010ft feet -.4213.7 Vertical Change REF1014.7to133816 10 ft feet19.3 Cold Patch 12331.6to140267 10 ft feet 3.5520.4 Vertical Change SF1021.4to $75 $75013381710ft feet .3527.2 Vertical Change LF1028.2to $75 $75013381810ft feet 2.0-3.032.3 Cross Slope (PAR)SF3135.4to $120 $3,72014266110ft feet35.4 Cold Patch 8644.0to140268 10 ft feet 3.0-4.044.0 Cross Slope (PAR)SF6850.8to $120 $8,16014266210ft feet .4847.1 Vertical Change REF1048.1to133819 10 ft feet 2.0-3.050.8 Cross Slope (PAR)SF1452.2to $120 $1,68014266310ft feet 5.0-6.054.6 Cross Slope (PAR)SF2056.6to $120 $2,40014266410ft feet 2.0-3.058.2 Cross Slope (PAR)SF1659.8to $120 $1,92014266510ft feet -.3562.4 Vertical Change REF1063.4to133820 10 ft feet 2.0-3.062.8 Cross Slope (PAR)SF4967.7to $120 $5,88014266610ft feet 2.0-3.070.7 Cross Slope (PAR)SF3974.6to $120 $4,68014266710ft feet 2.0-3.077.1 Cross Slope (PAR)SF1178.2to $120 $1,32014266810ft feet 4.0-5.079.4 Cross Slope (PAR)SF10790.1to $120 $12,84014266910ft feet .4385.4 Vertical Change REF1086.4to133821 10 ft feet 2.0-3.090.1 Cross Slope (PAR)SF3793.8to $120 $4,44014267010ft feet 3.0-4.096.0 Cross Slope (PAR)SF59101.9to $120 $7,08014267110ft feet .3897.6 Vertical Change REF1098.6to133822 10 ft feet .47101.8 Vertical Change REF10102.8to133823 10 ft feet 2.0-3.0101.9 Cross Slope (PAR)SF198121.7to $120 $23,76014267210ft feet121.9 Driveway163.9to164689 feet -.26138.2 Vertical Change REF10139.2to133824 10 ft feet -.39163.4 Vertical Change REF10164.4to133825 10 ft feet 4.0-5.0165.7 Cross Slope (PAR)SF181183.8to $120 $21,72014267310ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 702 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name 2120 E 25TH ST End Street Name 1911221057 Run ID E 25Th St 77 ID Sidewalk Width Priority feet -.3180.5 Vertical Change REF10181.5to133826 10 ft feet 2.0-3.0183.8 Cross Slope (PAR)SF135197.3to $120 $16,20014267410ft feet -.27191.2 Vertical Change REF10192.2to133827 10 ft feet197.3 Driveway221.8to164690 feet .28197.8 Vertical Change REF10198.8to133828 10 ft feet 4.0-5.0224.6 Cross Slope (PAR)SF37228.3to $120 $4,44014267510ft feet -.27228.3 Vertical Change REF10229.3to133829 10 ft feet 2.0-3.0229.3 Cross Slope (PAR)SF190248.3to $120 $22,80014267610ft feet .35230.9 Vertical Change REF10231.9to133830 10 ft feet 4.0-5.0248.6 Cross Slope (PAR)SF31251.7to $120 $3,72014267710ft feet 2.18252.0 Vertical Change SF10253.0to $75 $75013383110ft feet253.0 Driveway284.9to164691 feet -.26268.4 Vertical Change REF10269.4to133832 10 ft feet 4.0-5.0285.2 Cross Slope (Driveway)SF23287.5to $40 $92014267810ft feet .26285.8 Vertical Change REF10286.8to133833 10 ft feet 2.0-3.0287.5 Cross Slope (PAR)SF118299.3to $120 $14,16014267910ft feet .51299.8 Vertical Change SF10300.8to $75 $75013383410ft feet -.54305.0 Vertical Change SF10306.0to $75 $75013383510ft feet 3.0-4.0306.3 Cross Slope (PAR)SF10307.3to $120 $1,20014268010ft feet 3.0-4.0310.2 Cross Slope (PAR)SF144324.6to $120 $17,28014268110ft feet .76317.5 Vertical Change REF10318.5to133836 10 ft feet 3.0-4.0327.0 Cross Slope (PAR)SF58332.8to $120 $6,96014268210ft feet 5.0-6.0332.8 Cross Slope (PAR)SF77340.5to $120 $9,24014268310ft feet340.7 Driveway369.7to164692 feet -.31355.7 Vertical Change REF10356.7to133837 10 ft feet 4.0-5.0371.3 Cross Slope (PAR)SF15372.8to $120 $1,80014268410ft feet 2.0-3.0377.4 Cross Slope (PAR)SF89386.3to $120 $10,68014268510ft feet 4.0-5.0387.2 Cross Slope (PAR)SF74394.6to $120 $8,88014268610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 703 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name 2120 E 25TH ST End Street Name 1911221057 Run ID E 25Th St 77 ID Sidewalk Width Priority feet 3.0-4.0396.8 Cross Slope (PAR)SF25399.3to $120 $3,00014268710ft feet 2.0-3.0399.3 Cross Slope (PAR)SF35402.8to $120 $4,20014268810ft feet 4.0-5.0403.6 Cross Slope (PAR)SF142417.8to $120 $17,04014268910ft feet 4.0-5.0420.0 Cross Slope (PAR)SF12421.2to $120 $1,44014269010ft feet .42421.0 Vertical Change REF10422.0to133838 10 ft feet421.3 Driveway454.1to164693 feet .3429.7 Vertical Change REF10430.7to133839 10 ft feet .36436.3 Vertical Change REF10437.3to133840 10 ft feet 3.0-4.0455.8 Cross Slope (PAR)SF323488.1to $120 $38,76014269110ft feet 2.0-3.0488.1 Cross Slope (PAR)SF54493.5to $120 $6,48014269210ft feet 4.0-5.0493.8 Cross Slope (PAR)SF295523.3to $120 $35,40014269310ft feet .36506.0 Vertical Change REF10507.0to133841 10 ft feet523.3 Driveway556.4to164694 feet .39534.5 Vertical Change REF10535.5to133842 10 ft feet -.27545.3 Vertical Change REF10546.3to133843 10 ft feet 4.0-5.0557.2 Cross Slope (PAR)SF224579.6to $120 $26,88014269410ft feet 4.0-5.0584.3 Cross Slope (PAR)SF58590.1to $120 $6,96014269510ft feet 2.7586.7 Vertical Change REF10587.7to133844 10 ft feet591.4 Driveway615.5to164695 feet .37594.0 Vertical Change REF10595.0to133845 10 ft feet -.34600.5 Vertical Change REF10601.5to133846 10 ft feet 3.0-4.0616.1 Cross Slope (Driveway)SF37619.8to $40 $1,48014269610ft feet 4.0-5.0622.0 Cross Slope (PAR)SF79629.9to $120 $9,48014269710ft feet 2.0-3.0629.9 Cross Slope (PAR)SF88638.7to $120 $10,56014269810ft feet -.27635.2 Vertical Change REF10636.2to133847 10 ft feet 4.0-5.0638.8 Cross Slope (PAR)SF65645.3to $120 $7,80014269910ft feet 2.64641.0 Vertical Change REF10642.0to133848 10 ft feet 2.0-3.0646.5 Cross Slope (PAR)SF52651.7to $120 $6,24014270010ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 704 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 25TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name 2120 E 25TH ST End Street Name 1911221057 Run ID E 25Th St 77 ID Sidewalk Width Priority feet 4.0-5.0652.0 Cross Slope (PAR)SF51657.1to $120 $6,12014270110ft feet657.6 Driveway681.7to164696 feet 2.0-3.0686.8 Cross Slope (PAR)SF126699.4to $120 $15,12014270210ft feet699.9 Driveway742.8to164697 feet -.31713.2 Vertical Change REF10714.2to133849 10 ft feet 5.0-6.0743.8 Cross Slope (PAR)SF18745.6to $120 $2,16014270310ft feet 3.0-4.0748.8 Cross Slope (PAR)SF306779.4to $120 $36,72014270410ft feet 2.0-3.0781.3 Cross Slope (PAR)SF45785.8to $120 $5,40014270510ft feet 3.0-4.0788.3 Cross Slope (PAR)SF53793.6to $120 $6,36014270610ft feet 2.0-3.0795.2 Cross Slope (PAR)SF21797.3to $120 $2,52014270710ft feet 3.48799.1 Vertical Change SF10800.1to $75 $75013385010ft feet 2.0-3.0801.3 Cross Slope (PAR)SF16802.9to $120 $1,92014270810ft feet 3.0-4.0806.7 Cross Slope (PAR)SF56812.3to $120 $6,72014270910ft feet 2.0-3.0812.3 Cross Slope (PAR)SF245836.8to $120 $29,40014271010ft feet 3.0-4.0840.1 Cross Slope (PAR)SF124852.5to $120 $14,88014271110ft feet 2.0-3.0852.5 Cross Slope (PAR)SF37856.2to $120 $4,44014271210ft feet 4.0-5.0856.5 Cross Slope (PAR)SF107867.2to $120 $12,84014271310ft feet 2.0-3.0869.7 Cross Slope (PAR)SF249894.6to $120 $29,88014271410ft feet 4.0-5.0894.6 Cross Slope (PAR)SF61900.7to $120 $7,32014271510ft feet 2.0-3.0900.7 Cross Slope (PAR)SF181918.8to $120 $21,72014271610ft feet919.7 Driveway961.5to164698 feet 2.0-3.0961.5 Cross Slope (Driveway)SF21963.6to $40 $84014271710ft feet 4.0-5.0965.8 Cross Slope (PAR)SF40969.8to $120 $4,80014271810ft feet 2.0-3.0969.8 Cross Slope (PAR)SF64976.2to $120 $7,68014271910ft feet976.3 Driveway1029.5to164699 $624,900.00TOTAL COST FOR:E 25TH STSside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 705 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 2640 E 26TH ST Survey Street Name Starting Street Name S SOTO ST End Street Name 1912041344 Run ID E 26Th St 97.25 ID Sidewalk Width Priority feet1.1 Cold Patch 19640.4to140578 5 ft feet 1541.4 Running Slope SF943.2to $120 $1,0801666445ft feet44.7 Continuous Width REF545.7to167032 5 ft feet .472.6 Vertical Change LF573.6to $75 $3751391235ft feet -.2796.7 Vertical Change LF597.7to $75 $3751391245ft feet -.28165.6 Vertical Change LF5166.6to $75 $3751391255ft feet -.77182.8 Vertical Change SF5183.8to $75 $3751391265ft feet 2.0-3.0236.1 Cross Slope (PAR)SF9237.8to $120 $1,0201612295ft feet -.27251.7 Vertical Change LF5252.7to $75 $3751391275ft feet 2.0-3.0291.3 Cross Slope (PAR)SF48300.8to $120 $5,7001612305ft feet 2.0-3.0304.3 Cross Slope (PAR)SF95323.2to $120 $11,3401612315ft feet 5.0-6.0304.3 Running Slope SF12306.6to $120 $1,3801666455ft feet 6.0-7.0307.0 Running Slope SF68320.6to $120 $8,1601666465ft feet321.1 Continuous Width REF5322.1to167033 5 ft feet 2.0-3.0325.6 Cross Slope (PAR)SF8327.1to $120 $9001612325ft feet 2.0-3.0329.2 Cross Slope (PAR)SF29334.9to $120 $3,4201612335ft feet 2.0-3.0341.3 Cross Slope (PAR)SF14344.1to $120 $1,6801612345ft feet 2.0-3.0347.9 Cross Slope (PAR)SF61360.1to $120 $7,3201612355ft feet 3.0-4.0362.3 Cross Slope (PAR)SF49372.1to $120 $5,8801612365ft feet 2.0-3.0372.3 Cross Slope (PAR)SF34379.1to $120 $4,0801612375ft feet 4.0-5.0379.5 Cross Slope (PAR)SF229425.3to $120 $27,4801612385ft feet 2.0-3.0425.3 Cross Slope (PAR)SF64438.0to $120 $7,6201612395ft feet438.3 Driveway484.0to166192 feet .28462.7 Vertical Change REF5463.7to139128 5 ft feet -.29471.3 Vertical Change REF5472.3to139129 5 ft feet .33482.9 Vertical Change REF5483.9to139130 5 ft feet 4.0-5.0485.0 Cross Slope (PAR)SF216528.3to $120 $25,9801612405ft feet 2.0-3.0528.8 Cross Slope (PAR)SF20532.7to $120 $2,3401612415ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 706 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 2640 E 26TH ST Survey Street Name Starting Street Name S SOTO ST End Street Name 1912041344 Run ID E 26Th St 97.25 ID Sidewalk Width Priority feet -.55530.4 Vertical Change REF14533.3to139131 5 ft feet 4.0-5.0533.2 Cross Slope (PAR)SF38540.9to $120 $4,6201612425ft feet542.4 Driveway615.3to166193 feet -.32544.3 Vertical Change REF5545.3to139132 5 ft feet 5.0-6.0615.9 Cross Slope (PAR)SF8617.4to $120 $9001612435ft feet 6.0-7.0617.4 Cross Slope (PAR)SF9619.2to $120 $1,0801612445ft feet 5.0-6.0619.3 Cross Slope (PAR)SF43627.8to $120 $5,1001612455ft feet628.6 Driveway662.6to166194 feet 4.0-5.0663.8 Cross Slope (PAR)SF49673.6to $120 $5,8801612465ft feet 3.0-4.0676.0 Cross Slope (PAR)SF7677.3to $120 $7801612475ft feet 2.0-3.0679.9 Cross Slope (PAR)SF7681.2to $120 $7801612485ft feet 4.0-5.0682.7 Cross Slope (PAR)SF31688.9to $120 $3,7201612495ft feet692.9 Driveway719.1to166195 feet .27696.6 Vertical Change REF5697.6to139133 5 ft feet 5.0-6.0720.3 Cross Slope (PAR)SF13722.8to $120 $1,5001612505ft feet 3.0-4.0725.4 Cross Slope (PAR)SF51735.6to $120 $6,1201612515ft feet -.59727.9 Vertical Change REF5728.9to139134 5 ft feet 5.0-6.0735.6 Cross Slope (PAR)SF5736.6to $120 $6001612525ft feet 6.0-7.0736.6 Cross Slope (PAR)SF19740.3to $120 $2,2201612535ft feet 4.0-5.0741.5 Cross Slope (PAR)SF37748.9to $120 $4,4401612545ft feet 2.0-3.0748.9 Cross Slope (PAR)SF25753.8to $120 $2,9401612555ft feet 4.0-5.0755.7 Cross Slope (PAR)SF73770.2to $120 $8,7001612565ft feet 5.0-6.0773.1 Cross Slope (PAR)SF43781.7to $120 $5,1601612575ft feet778.0 Continuous Width SF5779.0to $120 $6001669835ft $172,395.00TOTAL COST FOR:E 26TH STSside of Starting at:2640 E 26TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 707 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side 2677 E 26TH ST Survey Street Name Starting Street Name HARRIET ST End Street Name 1912041614 Run ID E 26Th St 49 ID Sidewalk Width Priority feet 2.0-3.017.8 Cross Slope (PAR)SF5022.8to $120 $6,00016059810ft feet 2.0-3.028.3 Cross Slope (PAR)SF1029.3to $120 $1,20016059910ft feet 2.0-3.036.1 Cross Slope (PAR)SF1938.0to $120 $2,28016060010ft feet 2.0-3.059.8 Cross Slope (PAR)SF5365.1to $120 $6,36016060110ft feet 2.0-3.087.0 Cross Slope (PAR)SF2189.1to $120 $2,52016060210ft feet 2.0-3.096.7 Cross Slope (PAR)SF1097.7to $120 $1,20016060310ft feet 2.0-3.0100.9 Cross Slope (PAR)SF10101.9to $120 $1,20016060410ft feet 2.0-3.0117.3 Cross Slope (PAR)SF75124.8to $120 $9,00016060510ft feet120.2 Continuous Width REF10121.2to167799 10 ft feet124.8 Driveway164.3to166157 feet165.1 Cold Patch 168181.9to140573 10 ft feet .29179.0 Vertical Change LF10180.0to $75 $75013897310ft feet182.0 Driveway214.1to166158 feet 2.0-3.0225.0 Cross Slope (PAR)SF35228.5to $120 $4,20016060610ft feet 2.0-3.0236.6 Cross Slope (PAR)SF54242.0to $120 $6,48016060710ft feet 2.0-3.0251.4 Cross Slope (PAR)SF14252.8to $120 $1,68016060810ft feet 2.0-3.0255.9 Cross Slope (PAR)SF79263.8to $120 $9,48016060910ft feet 2.0-3.0271.8 Cross Slope (PAR)SF56277.4to $120 $6,72016061010ft feet 2.0-3.0292.3 Cross Slope (PAR)SF82300.5to $120 $9,84016061110ft feet 3.0-4.0305.5 Cross Slope (PAR)SF34308.9to $120 $4,08016061210ft feet 2.0-3.0309.9 Cross Slope (PAR)SF14311.3to $120 $1,68016061310ft feet 2.0-3.0313.5 Cross Slope (PAR)SF12314.7to $120 $1,44016061410ft feet 2.0-3.0330.7 Cross Slope (PAR)SF39334.6to $120 $4,68016061510ft feet 2.0-3.0385.3 Cross Slope (PAR)SF27388.0to $120 $3,24016061610ft feet 2.0-3.0393.5 Cross Slope (PAR)SF33396.8to $120 $3,96016061710ft feet -.78400.2 Vertical Change SF10401.2to $75 $75013897410ft feet 2.0-3.0407.4 Cross Slope (PAR)SF14408.8to $120 $1,68016061810ft feet 2.0-3.0411.2 Cross Slope (PAR)SF26413.8to $120 $3,12016061910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 708 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side 2677 E 26TH ST Survey Street Name Starting Street Name HARRIET ST End Street Name 1912041614 Run ID E 26Th St 49 ID Sidewalk Width Priority feet 2.0-3.0420.3 Cross Slope (PAR)SF35423.8to $120 $4,20016062010ft feet 2.0-3.0430.4 Cross Slope (PAR)SF23432.7to $120 $2,76016062110ft feet432.7 Driveway458.9to166159 feet 3.0-4.0459.3 Cross Slope (Driveway)SF48464.1to $40 $1,92016062210ft feet 3.0-4.0466.3 Cross Slope (PAR)SF103476.6to $120 $12,36016062310ft feet 2.0-3.0477.8 Cross Slope (PAR)SF20479.8to $120 $2,40016062410ft feet .27482.8 Vertical Change LF10483.8to $75 $75013897510ft feet 2.0-3.0486.8 Cross Slope (PAR)SF10487.8to $120 $1,20016062510ft feet 2.0-3.0495.3 Cross Slope (PAR)SF35498.8to $120 $4,20016062610ft feet 2.0-3.0501.0 Cross Slope (PAR)SF136514.6to $120 $16,32016062710ft feet 3.0-4.0520.1 Cross Slope (PAR)SF61526.2to $120 $7,32016062810ft feet 2.0-3.0532.5 Cross Slope (PAR)SF140546.5to $120 $16,80016062910ft feet 4.0-5.0546.5 Cross Slope (PAR)SF91555.6to $120 $10,92016063010ft feet 2.0-3.0555.6 Cross Slope (PAR)SF119567.5to $120 $14,28016063110ft feet 2.0-3.0572.1 Cross Slope (PAR)SF29575.0to $120 $3,48016063210ft feet .28573.3 Vertical Change REF10574.3to138976 10 ft feet 2.0-3.0581.0 Cross Slope (PAR)SF235604.5to $120 $28,20016063310ft feet 2.0-3.0606.8 Cross Slope (PAR)SF26609.4to $120 $3,12016063410ft feet 2.0-3.0613.4 Cross Slope (PAR)SF75620.9to $120 $9,00016063510ft feet 2.0-3.0627.8 Cross Slope (PAR)SF222650.0to $120 $26,64016063610ft feet -.4629.3 Vertical Change REF10630.3to138977 10 ft feet 2.0-3.0654.7 Cross Slope (PAR)SF64661.1to $120 $7,68016063710ft $267,090.00TOTAL COST FOR:E 26TH STNside of Starting at:2677 E 26TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 709 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 3770 E 26TH ST Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161545 Run ID E 26Th St 35.75 ID Sidewalk Width Priority feet 2.0-3.02.3 Cross Slope (PAR)SF438.0to $120 $5,1301563278ft feet 2.0-3.010.3 Cross Slope (PAR)SF1312.0to $120 $1,5301563288ft feet 2.0-3.014.1 Cross Slope (PAR)SF1215.7to $120 $1,4401563298ft feet 2.0-3.019.9 Cross Slope (PAR)SF3424.4to $120 $4,0501563308ft feet 2.0-3.028.2 Cross Slope (PAR)SF5735.8to $120 $6,8401563318ft feet 4.0-5.037.9 Cross Slope (PAR)SF19664.1to $120 $23,5801563328ft feet 2.0-3.065.3 Cross Slope (PAR)SF8076.0to $120 $9,6301563338ft feet 3.0-4.078.6 Cross Slope (PAR)SF1180.1to $120 $1,3501563348ft feet80.1 Driveway109.8to165864 feet 4.0-5.0111.8 Cross Slope (PAR)SF84123.0to $120 $10,0801563358ft feet123.0 Driveway150.4to165865 feet 3.0-4.0150.7 Cross Slope (PAR)SF8151.7to $120 $9001563368ft feet 2.0-3.0151.8 Cross Slope (PAR)SF86163.3to $120 $10,3501563378ft feet 2.0-3.0165.8 Cross Slope (PAR)SF12167.4to $120 $1,4401563388ft feet 2.0-3.0172.5 Cross Slope (PAR)SF29176.3to $120 $3,4201563398ft feet 4.0-5.0177.3 Cross Slope (PAR)SF11178.8to $120 $1,3501563408ft feet 2.0-3.0179.9 Cross Slope (PAR)SF18182.3to $120 $2,1601563418ft feet 4.0-5.0184.6 Cross Slope (PAR)SF30188.6to $120 $3,6001563428ft feet 3.0-4.0193.2 Cross Slope (PAR)SF12194.8to $120 $1,4401563438ft feet 2.0-3.0194.8 Cross Slope (PAR)SF9196.0to $120 $1,0801563448ft feet 4.0-5.0201.3 Cross Slope (PAR)SF8202.4to $120 $9901563458ft feet 3.0-4.0204.9 Cross Slope (PAR)SF269240.8to $120 $32,3101563468ft feet 3.59221.1 Vertical Change REF8222.1to137854 8 ft feet 2.0-3.0243.5 Cross Slope (PAR)SF17245.8to $120 $2,0701563478ft feet 4.0-5.0246.4 Cross Slope (PAR)SF77256.7to $120 $9,2701563488ft feet 2.0-3.0256.7 Cross Slope (PAR)SF24259.9to $120 $2,8801563498ft feet 3.0-4.0262.5 Cross Slope (PAR)SF77272.8to $120 $9,2701563508ft feet 2.0-3.0272.8 Cross Slope (PAR)SF184297.4to $120 $22,1401563518ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 710 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 3770 E 26TH ST Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161545 Run ID E 26Th St 35.75 ID Sidewalk Width Priority feet 2.0-3.0299.9 Cross Slope (PAR)SF128317.0to $120 $15,3901563528ft feet 4.0-5.0317.5 Cross Slope (PAR)SF82328.4to $120 $9,8101563538ft feet 2.0-3.0328.7 Cross Slope (PAR)SF12330.3to $120 $1,4401563548ft feet 2.0-3.0340.9 Cross Slope (PAR)SF509408.8to $120 $61,1101563558ft feet 2.0-3.0418.8 Cross Slope (PAR)SF11420.3to $120 $1,3501563568ft feet 2.0-3.0428.7 Cross Slope (PAR)SF74438.6to $120 $8,9101563578ft feet 2.0-3.0446.1 Cross Slope (PAR)SF122462.4to $120 $14,6701563588ft feet .59463.2 Vertical Change SF8464.2to $75 $5631378558ft feet 3.0-4.0473.8 Cross Slope (PAR)SF56481.3to $120 $6,7501563598ft feet 2.0-3.0485.8 Cross Slope (PAR)SF11487.3to $120 $1,3501563608ft feet 3.0-4.0491.3 Cross Slope (PAR)SF24494.5to $120 $2,8801563618ft feet 2.0-3.0497.1 Cross Slope (PAR)SF20499.8to $120 $2,4301563628ft feet 2.0-3.0502.6 Cross Slope (PAR)SF25505.9to $120 $2,9701563638ft feet505.9 Driveway561.4to165866 feet 2.0-3.0571.5 Cross Slope (PAR)SF54578.7to $120 $6,4801563648ft feet 5.0-6.0576.4 Running Slope REF10577.7to166553 8 ft feet581.3 Driveway628.7to165867 feet 2.0-3.0635.1 Cross Slope (PAR)SF9636.3to $120 $1,0801563658ft feet 2.0-3.0645.3 Cross Slope (PAR)SF44651.2to $120 $5,3101563668ft feet 2.0-3.0656.3 Cross Slope (PAR)SF38661.3to $120 $4,5001563678ft feet 2.0-3.0664.8 Cross Slope (PAR)SF11666.2to $120 $1,2601563688ft feet 2.0-3.0670.1 Cross Slope (PAR)SF10671.4to $120 $1,1701563698ft feet 2.0-3.0686.3 Cross Slope (PAR)SF43692.0to $120 $5,1301563708ft feet 3.0-4.0694.9 Cross Slope (PAR)SF15696.9to $120 $1,8001563718ft feet 5.0-6.0697.4 Cross Slope (PAR)SF8698.4to $120 $9001563728ft feet 6.0-7.0699.7 Cross Slope (PAR)SF11701.1to $120 $1,2601563738ft feet 3.0-4.0706.8 Cross Slope (PAR)SF51713.6to $120 $6,1201563748ft feet 2.0-3.0717.8 Cross Slope (PAR)SF29721.6to $120 $3,4201563758ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 711 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 3770 E 26TH ST Survey Street Name Starting Street Name S INDIANA ST End Street Name 2001161545 Run ID E 26Th St 35.75 ID Sidewalk Width Priority feet 2.0-3.0748.6 Cross Slope (PAR)SF347794.9to $120 $41,6701563768ft feet 2.0-3.0800.4 Cross Slope (PAR)SF31804.5to $120 $3,6901563778ft feet 2.0-3.0807.0 Cross Slope (PAR)SF105821.0to $120 $12,6001563788ft feet 3.0-4.0826.8 Cross Slope (PAR)SF11828.3to $120 $1,3501563798ft feet 3.0-4.0831.5 Cross Slope (PAR)SF134849.3to $120 $16,0201563808ft feet 2.0-3.0850.7 Cross Slope (PAR)SF34855.2to $120 $4,0501563818ft feet 3.0-4.0857.6 Cross Slope (PAR)SF38862.6to $120 $4,5001563828ft feet 2.0-3.0862.8 Cross Slope (PAR)SF44868.7to $120 $5,3101563838ft feet 3.0-4.0875.2 Cross Slope (PAR)SF76885.3to $120 $9,0901563848ft feet 2.0-3.0885.8 Cross Slope (PAR)SF143904.8to $120 $17,1001563858ft feet 2.0-3.0907.5 Cross Slope (PAR)SF70916.8to $120 $8,3701563868ft feet 3.0-4.0920.4 Cross Slope (PAR)SF89932.3to $120 $10,7101563878ft feet 2.0-3.0932.7 Cross Slope (PAR)SF114947.9to $120 $13,6801563888ft feet 4.0-5.0947.9 Cross Slope (PAR)SF24951.1to $120 $2,8801563898ft feet -.28949.1 Vertical Change REF8950.1to137856 8 ft feet 2.0-3.0954.1 Cross Slope (PAR)SF28957.8to $120 $3,3301563908ft feet 5.0-6.0956.7 Running Slope REF18959.1to166554 8 ft $490,702.50TOTAL COST FOR:E 26TH STSside of Starting at:3770 E 26TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 712 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 4366 E 26TH ST Survey Street Name Starting Street Name AYERS AVE End Street Name 2001160953 Run ID E 26Th St 73.25 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF314.6to $120 $3,7261578047ft feet 4.0-5.05.8 Cross Slope (PAR)SF3010.3to $120 $3,6451578057ft feet 2.0-3.010.3 Cross Slope (PAR)SF911.7to $120 $1,1341578067ft feet 3.0-4.014.7 Cross Slope (PAR)SF1416.8to $120 $1,7011578077ft feet 2.0-3.016.8 Cross Slope (PAR)SF11834.3to $120 $14,1751578087ft feet 2.0-3.036.9 Cross Slope (PAR)SF8048.8to $120 $9,6391578097ft feet 4.0-5.050.6 Cross Slope (PAR)SF2053.6to $120 $2,4301578107ft feet 4.0-5.055.9 Cross Slope (PAR)SF3661.3to $120 $4,3741578117ft feet 2.0-3.067.9 Cross Slope (PAR)SF7278.6to $120 $8,6671578127ft feet 2.0-3.082.7 Cross Slope (PAR)SF4489.2to $120 $5,2651578137ft feet -.2782.8 Vertical Change REF783.8to138096 7 ft feet89.2 Driveway115.9to165925 feet .3102.0 Vertical Change REF7103.0to138097 7 ft feet 3.0-4.0118.3 Cross Slope (PAR)SF51125.8to $120 $6,0751578147ft feet 2.0-3.0127.7 Cross Slope (PAR)SF106143.4to $120 $12,7171578157ft feet 2.0-3.0147.8 Cross Slope (PAR)SF58156.4to $120 $6,9661578167ft feet 3.0-4.0160.3 Cross Slope (PAR)SF22163.5to $120 $2,5921578177ft feet 2.0-3.0163.5 Cross Slope (PAR)SF12165.3to $120 $1,4581578187ft feet 2.0-3.0167.4 Cross Slope (PAR)SF33172.3to $120 $3,9691578197ft feet .29173.1 Vertical Change LF7174.1to $75 $5061380987ft feet 3.0-4.0175.0 Cross Slope (PAR)SF8176.2to $120 $9721578207ft feet .41180.1 Vertical Change REF7181.1to138099 7 ft feet 3.0-4.0180.6 Cross Slope (PAR)SF15182.8to $120 $1,7821578217ft feet 2.0-3.0194.8 Cross Slope (PAR)SF61203.8to $120 $7,2901578227ft feet 2.0-3.0213.2 Cross Slope (PAR)SF22216.5to $120 $2,6731578237ft feet 3.0-4.0219.0 Cross Slope (PAR)SF39224.8to $120 $4,6981578247ft feet 2.0-3.0224.8 Cross Slope (PAR)SF197254.0to $120 $23,6521578257ft feet .32261.5 Vertical Change LF7262.5to $75 $5061381017ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 713 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 4366 E 26TH ST Survey Street Name Starting Street Name AYERS AVE End Street Name 2001160953 Run ID E 26Th St 73.25 ID Sidewalk Width Priority feet264.2 Cold Patch 24267.8to140558 7 ft feet 7.0-8.0270.6 Cross Slope (PAR)SF12272.4to $120 $1,4581578267ft feet .29274.4 Vertical Change LF7275.4to $75 $5061381027ft feet 2.0-3.0276.0 Cross Slope (PAR)SF10277.5to $120 $1,2151578277ft feet 2.0-3.0280.4 Cross Slope (PAR)SF13282.3to $120 $1,5391578287ft feet 3.0-4.0284.5 Cross Slope (PAR)SF16286.8to $120 $1,8631578297ft feet 3.0-4.0288.9 Cross Slope (PAR)SF30293.3to $120 $3,5641578307ft feet 2.0-3.0293.3 Cross Slope (PAR)SF30297.7to $120 $3,5641578317ft feet 2.0-3.0300.4 Cross Slope (PAR)SF133320.1to $120 $15,9571578327ft feet 3.0-4.0325.3 Cross Slope (PAR)SF10326.8to $120 $1,2151578337ft feet 2.0-3.0326.8 Cross Slope (PAR)SF43333.1to $120 $5,1031578347ft feet 4.0-5.0337.6 Cross Slope (PAR)SF8338.8to $120 $9721578357ft feet 2.0-3.0339.3 Cross Slope (PAR)SF7340.3to $120 $8101578367ft feet 2.0-3.0343.7 Cross Slope (PAR)SF7344.7to $120 $8101578377ft feet 2.0-3.0346.8 Cross Slope (PAR)SF60355.7to $120 $7,2091578387ft feet 1.95354.6 Vertical Change REF7355.6to138103 7 ft feet 5.0-6.0363.7 Cross Slope (PAR)SF7364.8to $120 $8911578397ft feet 6.0-7.0365.1 Cross Slope (PAR)SF44371.6to $120 $5,2651578407ft feet371.6 Driveway421.2to165926 feet 4.0-5.0423.4 Cross Slope (PAR)SF9424.8to $120 $1,1341578417ft feet 3.0-4.0427.0 Cross Slope (PAR)SF39432.8to $120 $4,6981578427ft feet 3.0-4.0435.1 Cross Slope (PAR)SF14437.1to $120 $1,6201578437ft feet 3.0-4.0443.8 Cross Slope (PAR)SF10445.3to $120 $1,2151578447ft feet 2.0-3.0445.8 Cross Slope (PAR)SF28449.9to $120 $3,3211578457ft feet 4.0-5.0449.9 Cross Slope (PAR)SF14451.9to $120 $1,6201578467ft feet 2.0-3.0455.0 Cross Slope (PAR)SF7456.0to $120 $8101578477ft feet468.3 Driveway495.3to165927 feet 2.0-3.0495.5 Cross Slope (PAR)SF49502.8to $120 $5,9131578487ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 714 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 4366 E 26TH ST Survey Street Name Starting Street Name AYERS AVE End Street Name 2001160953 Run ID E 26Th St 73.25 ID Sidewalk Width Priority feet 2.0-3.0506.6 Cross Slope (PAR)SF8507.8to $120 $9721578497ft feet 2.0-3.0518.6 Cross Slope (PAR)SF35523.8to $120 $4,2121578507ft feet526.3 Driveway555.9to165928 feet .26542.2 Vertical Change REF7543.2to138104 7 ft feet 3.0-4.0556.7 Cross Slope (PAR)SF9558.0to $120 $1,0531578517ft feet 2.0-3.0559.1 Cross Slope (PAR)SF86571.8to $120 $10,2871578527ft feet 5.0-6.0568.8 Running Slope REF11570.4to166613 7 ft feet572.8 Driveway589.8to165929 feet .42578.4 Vertical Change REF7579.4to138105 7 ft feet 2.0-3.0590.3 Cross Slope (Driveway)SF8591.5to $40 $3241578537ft feet 3.0-4.0600.8 Cross Slope (PAR)SF17603.3to $120 $2,0251578547ft feet 3.0-4.0607.9 Cross Slope (PAR)SF38613.6to $120 $4,6171578557ft feet 2.0-3.0619.1 Cross Slope (PAR)SF45625.7to $120 $5,3461578567ft feet625.8 Driveway668.3to165930 feet 2.0-3.0673.3 Cross Slope (PAR)SF19676.1to $120 $2,2681578577ft feet 4.0-5.0676.1 Cross Slope (PAR)SF34681.2to $120 $4,1311578587ft feet 3.0-4.0683.7 Cross Slope (PAR)SF45690.4to $120 $5,4271578597ft feet 2.0-3.0691.0 Cross Slope (PAR)SF49698.3to $120 $5,9131578607ft feet -.29694.5 Vertical Change REF7695.5to138106 7 ft feet 2.0-3.0704.3 Cross Slope (PAR)SF84716.7to $120 $10,0441578617ft feet 4.0-5.0716.7 Cross Slope (PAR)SF26720.6to $120 $3,1591578627ft feet 2.0-3.0720.6 Cross Slope (PAR)SF12722.4to $120 $1,4581578637ft feet 2.0-3.0725.1 Cross Slope (PAR)SF35730.3to $120 $4,2121578647ft feet .26728.5 Vertical Change REF7729.5to138107 7 ft feet 4.0-5.0730.4 Cross Slope (PAR)SF57738.8to $120 $6,8041578657ft feet 2.0-3.0745.5 Cross Slope (PAR)SF51753.0to $120 $6,0751578667ft feet 2.0-3.0755.7 Cross Slope (PAR)SF32760.5to $120 $3,8881578677ft feet -.31758.6 Vertical Change REF7759.6to138108 7 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 715 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side 4366 E 26TH ST Survey Street Name Starting Street Name AYERS AVE End Street Name 2001160953 Run ID E 26Th St 73.25 ID Sidewalk Width Priority feet 2.0-3.0763.4 Cross Slope (PAR)SF182790.4to $120 $21,8701578687ft feet776.1 Continuous Width REF7777.1to167761 7 ft feet 3.0-4.0794.1 Cross Slope (PAR)SF49801.3to $120 $5,8321578697ft feet .33799.6 Vertical Change REF7800.6to138109 7 ft feet 2.0-3.0802.0 Cross Slope (PAR)SF24805.6to $120 $2,9161578707ft feet -.26806.6 Vertical Change REF7807.6to138110 7 ft feet 4.0-5.0807.2 Cross Slope (PAR)SF118824.7to $120 $14,1751578717ft feet -.27814.1 Vertical Change REF7815.1to138111 7 ft feet815.9 Continuous Width SF7816.9to $120 $8101668167ft feet .39817.3 Vertical Change REF7818.3to138112 7 ft feet 7.0-8.0827.3 Cross Slope (PAR)SF12829.1to $120 $1,4581578727ft feet 5.0-6.0832.8 Cross Slope (PAR)SF10834.3to $120 $1,2151578737ft feet 3.0-4.0835.0 Cross Slope (PAR)SF10836.5to $120 $1,2151578747ft feet 2.0-3.0836.5 Cross Slope (PAR)SF11838.1to $120 $1,2961578757ft $335,886.75TOTAL COST FOR:E 26TH STSside of Starting at:4366 E 26TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 716 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side AYERS AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001161030 Run ID E 26Th St 115 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF101.3to $120 $1,1701575658ft feet 5.0-6.04.4 Cross Slope (PAR)SF197.0to $120 $2,3401575668ft feet 6.0-7.07.0 Cross Slope (PAR)SF88.1to $120 $9901575678ft feet 6.0-7.011.3 Cross Slope (PAR)SF812.3to $120 $9001575688ft feet 5.0-6.014.3 Cross Slope (PAR)SF1616.4to $120 $1,8901575698ft feet 3.0-4.016.9 Cross Slope (PAR)SF1418.8to $120 $1,7101575708ft feet 5.0-6.020.8 Cross Slope (PAR)SF1422.7to $120 $1,7101575718ft feet 2.0-3.025.6 Cross Slope (PAR)SF4431.5to $120 $5,3101575728ft feet 2.0-3.034.3 Cross Slope (PAR)SF935.5to $120 $1,0801575738ft feet 3.0-4.045.1 Cross Slope (PAR)SF1046.4to $120 $1,1701575748ft feet 2.0-3.046.4 Cross Slope (PAR)SF1047.7to $120 $1,1701575758ft feet 3.0-4.052.9 Cross Slope (PAR)SF2956.7to $120 $3,4201575768ft feet 2.0-3.071.0 Cross Slope (PAR)SF6679.8to $120 $7,9201575778ft feet 3.0-4.083.8 Cross Slope (PAR)SF884.8to $120 $9001575788ft feet 5.0-6.085.5 Cross Slope (PAR)SF2488.7to $120 $2,8801575798ft feet 2.0-3.089.4 Cross Slope (PAR)SF890.4to $120 $9001575808ft feet .3198.5 Vertical Change LF899.5to $75 $5631380338ft feet 2.0-3.0101.1 Cross Slope (PAR)SF52108.0to $120 $6,2101575818ft feet 6.0-7.0110.8 Cross Slope (PAR)SF8111.9to $120 $9901575828ft feet 2.0-3.0115.7 Cross Slope (PAR)SF48122.1to $120 $5,7601575838ft feet .43127.1 Vertical Change LF8128.1to $75 $5631380348ft feet 2.0-3.0129.7 Cross Slope (PAR)SF12131.3to $120 $1,4401575848ft feet 2.0-3.0135.8 Cross Slope (PAR)SF54143.0to $120 $6,4801575858ft feet 2.0-3.0146.3 Cross Slope (PAR)SF28150.0to $120 $3,3301575868ft feet 2.22149.5 Vertical Change REF8150.5to138035 8 ft feet149.8 Continuous Width REF8150.8to167837 8 ft feet 4.0-5.0152.7 Cross Slope (PAR)SF22155.6to $120 $2,6101575878ft feet 2.0-3.0155.6 Cross Slope (PAR)SF8156.7to $120 $9901575888ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 717 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side AYERS AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001161030 Run ID E 26Th St 115 ID Sidewalk Width Priority feet 3.0-4.0159.8 Cross Slope (PAR)SF20162.5to $120 $2,4301575898ft feet 2.0-3.0162.7 Cross Slope (PAR)SF54169.9to $120 $6,4801575908ft feet .37164.1 Vertical Change REF8165.1to138036 8 ft feet 2.0-3.0173.0 Cross Slope (PAR)SF44178.9to $120 $5,3101575918ft feet 4.0-5.0178.9 Cross Slope (PAR)SF92191.1to $120 $10,9801575928ft feet .7181.8 Vertical Change REF8182.8to138037 8 ft feet 2.0-3.0192.9 Cross Slope (PAR)SF11194.4to $120 $1,3501575938ft feet 2.0-3.0196.6 Cross Slope (PAR)SF58204.3to $120 $6,9301575948ft feet 2.0-3.0210.3 Cross Slope (PAR)SF12211.9to $120 $1,4401575958ft feet 5.0-6.0215.0 Cross Slope (PAR)SF26218.5to $120 $3,1501575968ft feet 2.0-3.0218.9 Cross Slope (PAR)SF11220.3to $120 $1,2601575978ft feet .26220.5 Vertical Change LF8221.5to $75 $5631380388ft feet225.3 Continuous Width SF8226.3to $120 $9001672998ft feet .4226.1 Vertical Change LF8227.1to $75 $5631380398ft feet .5229.9 Vertical Change REF22232.8to138040 8 ft feet 2.0-3.0230.3 Cross Slope (PAR)SF17232.6to $120 $2,0701575988ft feet -.53235.3 Vertical Change SF24238.5to $75 $1,8001380418ft feet 2.0-3.0237.1 Cross Slope (PAR)SF216265.9to $120 $25,9201575998ft feet -.3243.9 Vertical Change REF8244.9to138042 8 ft feet .56252.8 Vertical Change REF8253.8to138043 8 ft feet .29255.9 Vertical Change REF7256.9to138044 8 ft feet .43264.3 Vertical Change REF8265.3to138045 8 ft feet 4.0-5.0265.9 Cross Slope (PAR)SF28269.6to $120 $3,3301576008ft feet 2.0-3.0272.1 Cross Slope (PAR)SF25275.4to $120 $2,9701576018ft feet 3.0-4.0279.7 Cross Slope (PAR)SF29283.6to $120 $3,5101576028ft feet 2.0-3.0284.4 Cross Slope (PAR)SF62292.7to $120 $7,4701576038ft feet 3.22292.9 Vertical Change REF8293.9to138046 8 ft feet 4.0-5.0293.4 Cross Slope (PAR)SF80304.1to $120 $9,6301576048ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 718 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side AYERS AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001161030 Run ID E 26Th St 115 ID Sidewalk Width Priority feet .47303.9 Vertical Change REF8304.9to138047 8 ft feet .5308.1 Vertical Change SF27311.7to $75 $2,0251380488ft feet 2.0-3.0309.8 Cross Slope (PAR)SF8310.8to $120 $9001576058ft feet .28314.1 Vertical Change LF8315.1to $75 $5631380498ft feet .9315.7 Vertical Change SF8316.7to $75 $5631380508ft feet 3.0-4.0317.8 Cross Slope (PAR)SF58325.5to $120 $6,9301576068ft feet .32320.7 Vertical Change REF8321.7to138051 8 ft feet .79323.2 Vertical Change REF8324.2to138052 8 ft feet 2.0-3.0326.3 Cross Slope (PAR)SF128343.3to $120 $15,3001576078ft feet 2.0-3.0345.5 Cross Slope (PAR)SF49352.0to $120 $5,8501576088ft feet .8353.9 Vertical Change REF8354.9to138053 8 ft feet 3.0-4.0354.4 Cross Slope (PAR)SF47360.6to $120 $5,5801576098ft feet .33359.3 Vertical Change REF8360.3to138054 8 ft feet 2.0-3.0360.6 Cross Slope (PAR)SF10361.9to $120 $1,1701576108ft feet 2.0-3.0364.8 Cross Slope (PAR)SF62373.0to $120 $7,3801576118ft feet 4.0-5.0374.2 Cross Slope (PAR)SF20376.9to $120 $2,4301576128ft feet .46374.7 Vertical Change REF8375.7to138055 8 ft feet 2.0-3.0378.5 Cross Slope (PAR)SF35383.2to $120 $4,2301576138ft feet .52379.6 Vertical Change REF8380.6to138056 8 ft feet 2.0-3.0386.1 Cross Slope (PAR)SF10387.4to $120 $1,1701576148ft feet 2.0-3.0390.4 Cross Slope (PAR)SF39395.6to $120 $4,6801576158ft feet394.9 Continuous Width SF8395.9to $120 $9001673008ft feet -.4395.4 Vertical Change REF8396.4to138057 8 ft feet .26397.9 Vertical Change LF8398.9to $75 $5631380588ft feet 4.0-5.0400.8 Cross Slope (PAR)SF60408.8to $120 $7,2001576168ft feet 3.0-4.0412.2 Cross Slope (PAR)SF8413.3to $120 $9901576178ft feet 2.0-3.0413.3 Cross Slope (PAR)SF14415.1to $120 $1,6201576188ft feet 3.0-4.0417.5 Cross Slope (PAR)SF44423.3to $120 $5,2201576198ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 719 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side AYERS AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001161030 Run ID E 26Th St 115 ID Sidewalk Width Priority feet 2.0-3.0424.1 Cross Slope (PAR)SF13425.8to $120 $1,5301576208ft feet 3.0-4.0427.9 Cross Slope (PAR)SF8428.9to $120 $9001576218ft feet 2.0-3.0431.5 Cross Slope (PAR)SF182455.8to $120 $21,8701576228ft feet -.3437.1 Vertical Change REF8438.1to138059 8 ft feet 2.0-3.0462.1 Cross Slope (PAR)SF74471.9to $120 $8,8201576238ft feet 2.0-3.0475.7 Cross Slope (PAR)SF162497.3to $120 $19,4401576248ft feet .82476.8 Vertical Change REF8477.8to138060 8 ft feet502.3 Driveway531.5to165920 feet 2.0-3.0531.5 Cross Slope (Driveway)SF13533.2to $40 $5101576258ft feet 4.0-5.0537.3 Cross Slope (PAR)SF17539.6to $120 $2,0701576268ft feet 2.0-3.0539.6 Cross Slope (PAR)SF26543.0to $120 $3,0601576278ft feet 2.0-3.0548.9 Cross Slope (PAR)SF51555.7to $120 $6,1201576288ft feet 2.0-3.0558.7 Cross Slope (PAR)SF91570.9to $120 $10,9801576298ft feet 4.0-5.0570.9 Cross Slope (PAR)SF32575.1to $120 $3,7801576308ft feet 2.0-3.0575.1 Cross Slope (PAR)SF20577.7to $120 $2,3401576318ft feet 4.0-5.0579.1 Cross Slope (PAR)SF20581.8to $120 $2,4301576328ft feet 2.0-3.0586.1 Cross Slope (PAR)SF14587.9to $120 $1,6201576338ft feet 3.0-4.0592.3 Cross Slope (PAR)SF25595.6to $120 $2,9701576348ft feet .99601.0 Vertical Change REF8602.0to138061 8 ft feet 3.0-4.0601.9 Cross Slope (PAR)SF8602.9to $120 $9001576358ft feet 2.0-3.0604.3 Cross Slope (PAR)SF8605.3to $120 $9001576368ft feet 2.0-3.0607.5 Cross Slope (PAR)SF10608.8to $120 $1,1701576378ft feet 2.0-3.0614.1 Cross Slope (PAR)SF36618.9to $120 $4,3201576388ft feet -.3622.0 Vertical Change LF8623.0to $75 $5631380628ft feet 3.0-4.0626.8 Cross Slope (PAR)SF11628.2to $120 $1,2601576398ft feet 2.0-3.0628.2 Cross Slope (PAR)SF113643.2to $120 $13,5001576408ft feet 2.0-3.0650.7 Cross Slope (PAR)SF8651.8to $120 $9901576418ft feet 2.0-3.0655.3 Cross Slope (PAR)SF186680.1to $120 $22,3201576428ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 720 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side AYERS AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001161030 Run ID E 26Th St 115 ID Sidewalk Width Priority feet 4.0-5.0680.1 Cross Slope (PAR)SF26683.5to $120 $3,0601576438ft feet 2.0-3.0684.1 Cross Slope (PAR)SF58691.8to $120 $6,9301576448ft feet 4.0-5.0692.6 Cross Slope (PAR)SF33697.0to $120 $3,9601576458ft feet 2.0-3.0698.3 Cross Slope (PAR)SF11699.8to $120 $1,3501576468ft feet 2.0-3.0702.9 Cross Slope (PAR)SF12704.5to $120 $1,4401576478ft feet 2.0-3.0706.6 Cross Slope (PAR)SF174729.8to $120 $20,8801576488ft feet 5.0-6.0731.4 Cross Slope (PAR)SF14733.3to $120 $1,7101576498ft feet 3.0-4.0733.9 Cross Slope (PAR)SF14735.7to $120 $1,6201576508ft feet 2.0-3.0735.8 Cross Slope (PAR)SF11737.2to $120 $1,2601576518ft feet 3.0-4.0741.4 Cross Slope (PAR)SF14743.2to $120 $1,6201576528ft feet .29742.3 Vertical Change REF8743.3to138063 8 ft feet 2.0-3.0743.2 Cross Slope (PAR)SF11744.7to $120 $1,3501576538ft feet749.1 Driveway801.8to165921 feet749.1 Driveway825.3to165922 feet 2.0-3.0802.6 Cross Slope (Driveway)SF69811.8to $40 $2,7601576548ft $420,015.00TOTAL COST FOR:E 26TH STSside of Starting at:AYERS AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 721 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side E 26TH ST Survey Street Name Starting Street Name S BONNIE BEACH PL End Street Name 2001160900 Run ID E 26Th St 52.75 ID Sidewalk Width Priority feet 3.0-4.00.5 Cross Slope (PAR)SF132.2to $120 $1,5301580718ft feet 2.0-3.02.4 Cross Slope (PAR)SF154.4to $120 $1,8001580728ft feet 2.0-3.07.6 Cross Slope (PAR)SF6115.7to $120 $7,2901580738ft feet17.8 Driveway55.3to165948 feet 1.8649.4 Vertical Change REF850.4to138156 8 ft feet 3.0-4.058.4 Cross Slope (PAR)SF1960.9to $120 $2,2501580748ft feet 3.0-4.063.3 Cross Slope (PAR)SF2266.2to $120 $2,6101580758ft feet 3.0-4.069.4 Cross Slope (PAR)SF1971.9to $120 $2,2501580768ft feet 2.0-3.073.1 Cross Slope (PAR)SF3978.3to $120 $4,6801580778ft feet 2.0-3.082.2 Cross Slope (PAR)SF8092.9to $120 $9,6301580788ft feet 2.0-3.095.9 Cross Slope (PAR)SF44101.8to $120 $5,3101580798ft feet 3.0-4.0105.8 Cross Slope (PAR)SF38110.8to $120 $4,5001580808ft feet 2.0-3.0112.5 Cross Slope (PAR)SF52119.4to $120 $6,2101580818ft feet 3.0-4.0122.2 Cross Slope (PAR)SF12123.8to $120 $1,4401580828ft feet 2.0-3.0126.2 Cross Slope (PAR)SF8127.3to $120 $9901580838ft feet 3.0-4.0130.1 Cross Slope (PAR)SF66138.9to $120 $7,9201580848ft feet 2.0-3.0138.9 Cross Slope (PAR)SF58146.7to $120 $7,0201580858ft feet 4.0-5.0148.2 Cross Slope (PAR)SF91160.3to $120 $10,8901580868ft feet 4.0-5.0162.8 Cross Slope (PAR)SF10164.1to $120 $1,1701580878ft feet166.5 Driveway189.9to165949 feet 2.0-3.0191.0 Cross Slope (PAR)SF95203.6to $120 $11,3401580888ft feet 4.0-5.0203.6 Cross Slope (PAR)SF41209.0to $120 $4,8601580898ft feet 2.0-3.0214.8 Cross Slope (PAR)SF25218.1to $120 $2,9701580908ft feet218.1 Driveway256.3to165950 feet .36218.8 Vertical Change REF8219.8to138157 8 ft feet 4.0-5.0257.6 Cross Slope (PAR)SF91269.7to $120 $10,8901580918ft feet 5.0-6.0267.3 Running Slope REF10268.6to166620 8 ft feet270.4 Driveway296.2to165951 feet 3.0-4.0297.5 Cross Slope (PAR)SF73307.2to $120 $8,7301580928ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 722 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side E 26TH ST Survey Street Name Starting Street Name S BONNIE BEACH PL End Street Name 2001160900 Run ID E 26Th St 52.75 ID Sidewalk Width Priority feet 2.0-3.0307.2 Cross Slope (PAR)SF250340.5to $120 $29,9701580938ft feet 3.0-4.0343.0 Cross Slope (PAR)SF9344.2to $120 $1,0801580948ft feet 2.0-3.0350.2 Cross Slope (PAR)SF35354.9to $120 $4,2301580958ft feet 2.0-3.0357.7 Cross Slope (PAR)SF144376.9to $120 $17,2801580968ft feet 3.0-4.0379.3 Cross Slope (PAR)SF40384.6to $120 $4,7701580978ft feet 3.0-4.0389.1 Cross Slope (PAR)SF10390.4to $120 $1,1701580988ft feet 3.0-4.0394.1 Cross Slope (PAR)SF53401.2to $120 $6,3901580998ft feet .35398.6 Vertical Change REF8399.6to138158 8 ft feet 3.0-4.0405.9 Cross Slope (PAR)SF77416.2to $120 $9,2701581008ft feet 2.0-3.0416.2 Cross Slope (PAR)SF101429.6to $120 $12,0601581018ft feet 2.0-3.0435.9 Cross Slope (PAR)SF131453.3to $120 $15,6601581028ft feet 2.0-3.0456.1 Cross Slope (PAR)SF9457.3to $120 $1,0801581038ft feet 4.0-5.0458.3 Cross Slope (PAR)SF53465.3to $120 $6,3001581048ft feet 2.0-3.0466.1 Cross Slope (PAR)SF148485.8to $120 $17,7301581058ft feet .69470.2 Vertical Change REF8471.2to138159 8 ft feet487.5 Driveway586.6to165952 feet 1.44522.2 Vertical Change REF8523.2to138160 8 ft feet .28565.0 Vertical Change REF8566.0to138161 8 ft feet 5.0-6.0586.6 Cross Slope (Driveway)SF37591.5to $40 $1,4701581068ft feet 3.0-4.0591.7 Cross Slope (PAR)SF8592.8to $120 $9901581078ft feet 3.0-4.0603.9 Cross Slope (PAR)SF35608.5to $120 $4,1401581088ft feet610.6 Driveway635.2to165953 feet 3.04620.1 Vertical Change REF8621.1to138162 8 ft feet 4.0-5.0635.9 Cross Slope (PAR)SF25639.2to $120 $2,9701581098ft feet 4.0-5.0642.7 Cross Slope (PAR)SF8643.8to $120 $9901581108ft feet 2.0-3.0646.8 Cross Slope (PAR)SF10648.1to $120 $1,1701581118ft feet 2.0-3.0657.1 Cross Slope (PAR)SF62665.3to $120 $7,3801581128ft feet666.8 Driveway690.5to165954 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 723 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side E 26TH ST Survey Street Name Starting Street Name S BONNIE BEACH PL End Street Name 2001160900 Run ID E 26Th St 52.75 ID Sidewalk Width Priority feet 4.0-5.0691.0 Cross Slope (PAR)SF51697.8to $120 $6,1201581138ft feet 3.0-4.0700.3 Cross Slope (PAR)SF9701.5to $120 $1,0801581148ft feet 3.0-4.0705.0 Cross Slope (PAR)SF92717.2to $120 $10,9801581158ft feet 3.0-4.0719.6 Cross Slope (PAR)SF123736.0to $120 $14,7601581168ft feet 2.0-3.0737.5 Cross Slope (PAR)SF11738.9to $120 $1,2601581178ft feet 2.0-3.0746.3 Cross Slope (PAR)SF8747.4to $120 $9901581188ft feet 3.0-4.0752.2 Cross Slope (PAR)SF11753.7to $120 $1,3501581198ft feet 2.0-3.0756.8 Cross Slope (PAR)SF20759.4to $120 $2,3401581208ft feet 2.0-3.0765.9 Cross Slope (PAR)SF13767.6to $120 $1,5301581218ft feet 2.0-3.0777.9 Cross Slope (PAR)SF9779.1to $120 $1,0801581228ft feet 2.0-3.0785.9 Cross Slope (PAR)SF14787.8to $120 $1,7101581238ft feet 2.0-3.0792.9 Cross Slope (PAR)SF50799.5to $120 $5,9401581248ft feet804.5 Driveway850.2to165955 feet .91822.6 Vertical Change REF8823.6to138163 8 ft feet 2.0-3.0855.0 Cross Slope (PAR)SF30859.0to $120 $3,6001581258ft feet 2.0-3.0864.5 Cross Slope (PAR)SF45870.5to $120 $5,4001581268ft feet 3.0-4.0872.7 Cross Slope (PAR)SF14874.5to $120 $1,6201581278ft feet 2.0-3.0877.3 Cross Slope (PAR)SF8878.3to $120 $9001581288ft feet 2.0-3.0884.7 Cross Slope (PAR)SF12886.3to $120 $1,4401581298ft feet 3.0-4.0893.8 Cross Slope (PAR)SF29897.7to $120 $3,5101581308ft feet 2.0-3.0898.0 Cross Slope (PAR)SF13899.7to $120 $1,5301581318ft feet 2.0-3.0902.4 Cross Slope (PAR)SF8903.5to $120 $9901581328ft feet 2.0-3.0907.8 Cross Slope (PAR)SF98920.8to $120 $11,7001581338ft feet 2.0-3.0925.3 Cross Slope (PAR)SF117940.9to $120 $14,0401581348ft feet 4.0-5.0941.4 Cross Slope (PAR)SF26944.9to $120 $3,1501581358ft feet 2.0-3.0947.6 Cross Slope (PAR)SF77957.9to $120 $9,2701581368ft feet 2.0-3.0960.6 Cross Slope (PAR)SF64969.1to $120 $7,6501581378ft feet 3.0-4.0972.3 Cross Slope (PAR)SF20974.9to $120 $2,3401581388ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 724 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side E 26TH ST Survey Street Name Starting Street Name S BONNIE BEACH PL End Street Name 2001160900 Run ID E 26Th St 52.75 ID Sidewalk Width Priority feet 3.26972.8 Vertical Change REF8973.8to138164 8 ft feet 3.0-4.0980.8 Cross Slope (PAR)SF22983.7to $120 $2,6101581398ft feet990.1 Driveway1036.8to165956 feet990.1 Driveway1114.2to165957 feet 2.0-3.01036.8 Cross Slope (Driveway)SF111038.2to $40 $4201581408ft feet 2.0-3.01056.6 Cross Slope (Driveway)SF181059.0to $40 $7201581418ft feet 2.321062.5 Vertical Change REF81063.5to138165 8 ft feet 5.0-6.01075.4 Cross Slope (Driveway)SF251078.8to $40 $1,0201581428ft feet 2.0-3.01079.8 Cross Slope (Driveway)SF111081.2to $40 $4201581438ft feet 4.0-5.01083.7 Cross Slope (Driveway)SF741093.6to $40 $2,9701581448ft feet 3.111088.8 Vertical Change REF81089.8to138166 8 ft feet 4.0-5.01096.4 Cross Slope (Driveway)SF81097.5to $40 $3301581458ft feet 3.0-4.01102.6 Cross Slope (Driveway)SF81103.6to $40 $3001581468ft feet 2.0-3.01104.7 Cross Slope (Driveway)SF251108.0to $40 $9901581478ft feet 4.0-5.01111.2 Cross Slope (Driveway)SF181113.6to $40 $7201581488ft $389,160.00TOTAL COST FOR:E 26TH STSside of Starting at:E 26TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 725 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side HARRIET ST Survey Street Name Starting Street Name MINERVA ST End Street Name 1911211600 Run ID E 26Th St 55.5 ID Sidewalk Width Priority feet 2.0-3.01.3 Cross Slope (PAR)SF22028.8to $120 $26,4001416538ft feet 2.0-3.032.7 Cross Slope (PAR)SF12548.3to $120 $14,9761416548ft feet 2.0-3.051.4 Cross Slope (PAR)SF8762.3to $120 $10,4641416558ft feet 2.0-3.070.8 Cross Slope (PAR)SF3475.1to $120 $4,1281416568ft feet 2.0-3.078.4 Cross Slope (PAR)SF3182.3to $120 $3,7441416578ft feet 2.0-3.088.4 Cross Slope (PAR)SF1189.8to $120 $1,3441416588ft feet97.6 Cold Patch 36102.1to140261 8 ft feet -.2797.7 Vertical Change LF898.7to $75 $6001334248ft feet .2799.6 Vertical Change LF8100.6to $75 $6001334258ft feet 2.0-3.0103.2 Cross Slope (PAR)SF262136.0to $120 $31,4881416598ft feet .34110.3 Vertical Change REF8111.3to133426 8 ft feet .27136.3 Vertical Change LF8137.3to $75 $6001334278ft feet 2.0-3.0139.7 Cross Slope (PAR)SF86150.4to $120 $10,2721416608ft feet -.27144.8 Vertical Change REF8145.8to133428 8 ft feet .33151.8 Vertical Change LF8152.8to $75 $6001334298ft feet -.31153.5 Vertical Change LF8154.5to $75 $6001334308ft feet 2.0-3.0156.3 Cross Slope (PAR)SF49162.4to $120 $5,8561416618ft feet162.9 Driveway207.8to164557 feet -.26166.8 Vertical Change REF8167.8to133431 8 ft feet -.37184.8 Vertical Change REF8185.8to133432 8 ft feet .28193.8 Vertical Change REF8194.8to133433 8 ft feet .27207.6 Vertical Change REF8208.6to133434 8 ft feet 2.0-3.0208.5 Cross Slope (Driveway)SF22211.2to $40 $8641416628ft feet 2.0-3.0214.8 Cross Slope (PAR)SF44220.3to $120 $5,2801416638ft feet .79216.5 Vertical Change REF8217.5to133435 8 ft feet 2.0-3.0223.3 Cross Slope (PAR)SF26226.6to $120 $3,1681416648ft feet 3.0-4.0229.6 Cross Slope (PAR)SF10230.9to $120 $1,2481416658ft feet239.0 Driveway282.3to164558 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 726 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side HARRIET ST Survey Street Name Starting Street Name MINERVA ST End Street Name 1911211600 Run ID E 26Th St 55.5 ID Sidewalk Width Priority feet -.33260.3 Vertical Change REF8261.3to133436 8 ft feet 5.0-6.0282.7 Cross Slope (PAR)SF20285.2to $120 $2,4001416668ft feet 3.0-4.0285.2 Cross Slope (PAR)SF24288.2to $120 $2,8801416678ft feet 5.0-6.0288.2 Cross Slope (PAR)SF49294.3to $120 $5,8561416688ft feet 3.0-4.0294.3 Cross Slope (PAR)SF158314.1to $120 $19,0081416698ft feet 2.0-3.0314.1 Cross Slope (PAR)SF124329.6to $120 $14,8801416708ft feet 2.0-3.0331.9 Cross Slope (PAR)SF158351.7to $120 $19,0081416718ft feet 1.83332.3 Vertical Change REF8333.3to133437 8 ft feet 2.0-3.0355.6 Cross Slope (PAR)SF254387.3to $120 $30,4321416728ft feet 2.0-3.0389.4 Cross Slope (PAR)SF68397.9to $120 $8,1601416738ft feet 2.0-3.0400.0 Cross Slope (PAR)SF190423.7to $120 $22,7521416748ft feet 2.0-3.0429.3 Cross Slope (PAR)SF11430.7to $120 $1,3441416758ft feet 2.0-3.0432.8 Cross Slope (PAR)SF106446.0to $120 $12,6721416768ft feet 2.0-3.0448.7 Cross Slope (PAR)SF12450.2to $120 $1,4401416778ft feet 2.0-3.0457.3 Cross Slope (PAR)SF32461.3to $120 $3,8401416788ft feet 2.0-3.0465.1 Cross Slope (PAR)SF48471.1to $120 $5,7601416798ft feet 3.0-4.0474.0 Cross Slope (PAR)SF34478.2to $120 $4,0321416808ft feet 2.0-3.0478.2 Cross Slope (PAR)SF26481.5to $120 $3,1681416818ft feet .27486.2 Vertical Change REF8487.2to133438 8 ft feet 3.0-4.0487.2 Cross Slope (PAR)SF42492.4to $120 $4,9921416828ft feet 2.0-3.0492.8 Cross Slope (PAR)SF56499.8to $120 $6,7201416838ft feet 4.0-5.0500.2 Cross Slope (PAR)SF9501.3to $120 $1,0561416848ft $292,632.00TOTAL COST FOR:E 26TH STNside of Starting at:HARRIET ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 727 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side HARRIET ST Survey Street Name Starting Street Name 2640 E 26TH ST End Street Name 1912041332 Run ID E 26Th St 68 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF91.7to $120 $1,0201612585ft feet1.9 Driveway33.5to166196 feet3.8 Continuous Width REF54.8to167013 5 ft feet 2.0-3.034.3 Cross Slope (Driveway)SF2839.9to $40 $1,1201612595ft feet -.6838.1 Vertical Change REF539.1to139135 5 ft feet 2.0-3.045.4 Cross Slope (PAR)SF846.9to $120 $9001612605ft feet 4.0-5.049.5 Cross Slope (PAR)SF851.1to $120 $9601612615ft feet 3.0-4.053.3 Cross Slope (PAR)SF22898.8to $120 $27,3001612625ft feet -.3397.5 Vertical Change REF598.5to139136 5 ft feet 5.0-6.099.6 Cross Slope (PAR)SF6100.7to $120 $6601612635ft feet 6.0-7.0100.8 Cross Slope (PAR)SF7102.1to $120 $7801612645ft feet 5.0-6.0103.5 Cross Slope (PAR)SF17106.9to $120 $2,0401612655ft feet 3.0-4.0106.9 Cross Slope (PAR)SF68120.4to $120 $8,1001612665ft feet 3.0-4.0122.8 Cross Slope (PAR)SF13125.3to $120 $1,5001612675ft feet 4.0-5.0127.4 Cross Slope (PAR)SF36134.7to $120 $4,3801612685ft feet 2.0-3.0134.7 Cross Slope (PAR)SF28140.3to $120 $3,3601612695ft feet 3.0-4.0142.5 Cross Slope (PAR)SF22146.8to $120 $2,5801612705ft feet 2.0-3.0146.8 Cross Slope (PAR)SF8148.3to $120 $9001612715ft feet -.58149.8 Vertical Change SF5150.8to $75 $3751391375ft feet 3.0-4.0151.4 Cross Slope (PAR)SF6152.7to $120 $7801612725ft feet 2.0-3.0154.4 Cross Slope (PAR)SF88172.0to $120 $10,5601612735ft feet -.36167.0 Vertical Change REF5168.0to139138 5 ft feet179.1 Driveway219.9to166197 feet 2.0-3.0222.0 Cross Slope (PAR)SF54232.7to $120 $6,4201612745ft feet 2.0-3.0238.9 Cross Slope (PAR)SF18242.4to $120 $2,1001612755ft feet255.5 Driveway292.3to166198 feet .33282.2 Vertical Change REF5283.2to139139 5 ft feet 2.0-3.0364.9 Cross Slope (PAR)SF11367.0to $120 $1,2601612765ft feet377.5 Driveway472.1to166199 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 728 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side HARRIET ST Survey Street Name Starting Street Name 2640 E 26TH ST End Street Name 1912041332 Run ID E 26Th St 68 ID Sidewalk Width Priority feet377.5 Driveway694.4to166200 feet .27396.4 Vertical Change REF5397.4to139140 5 ft feet -.28423.2 Vertical Change REF5424.2to139141 5 ft feet -.49445.0 Vertical Change REF5446.0to139142 5 ft feet .28453.4 Vertical Change REF5454.4to139143 5 ft feet 3.0-4.0472.7 Cross Slope (Driveway)SF5473.7to $40 $2001612775ft feet 2.0-3.0474.3 Cross Slope (Driveway)SF9476.1to $40 $3601612785ft feet 2.0-3.0479.6 Cross Slope (Driveway)SF31485.8to $40 $1,2401612795ft feet .45487.2 Vertical Change REF5488.2to139144 5 ft feet -.88489.5 Vertical Change REF5490.5to139145 5 ft feet 5.0-6.0490.8 Cross Slope (Driveway)SF27496.2to $40 $1,0801612805ft feet .41492.0 Vertical Change REF5493.0to139146 5 ft feet 2.0-3.0497.8 Cross Slope (Driveway)SF110519.8to $40 $4,4001612815ft feet 5.0-6.0521.6 Cross Slope (Driveway)SF5522.6to $40 $2001612825ft feet 4.0-5.0525.9 Cross Slope (Driveway)SF42534.3to $40 $1,6801612835ft feet 2.0-3.0535.8 Cross Slope (Driveway)SF65548.8to $40 $2,6001612845ft feet 4.0-5.0550.5 Cross Slope (Driveway)SF18554.0to $40 $7001612855ft feet 2.0-3.0557.8 Cross Slope (Driveway)SF19561.5to $40 $7401612865ft feet 3.0-4.0564.2 Cross Slope (Driveway)SF70578.3to $40 $2,8201612875ft feet 5.0-6.0579.8 Cross Slope (Driveway)SF10581.8to $40 $4001612885ft feet 4.0-5.0584.8 Cross Slope (Driveway)SF33591.4to $40 $1,3201612895ft feet 6.0-7.0591.9 Cross Slope (Driveway)SF6593.1to $40 $2401612905ft feet 5.0-6.0595.6 Cross Slope (Driveway)SF178631.1to $40 $7,1001612915ft feet 6.0-7.0632.0 Cross Slope (Driveway)SF16635.2to $40 $6401612925ft feet 7.0-8.0638.0 Cross Slope (Driveway)SF7639.4to $40 $2801612935ft feet 5.0-6.0641.8 Cross Slope (Driveway)SF32648.1to $40 $1,2601612945ft feet 3.0-4.0649.2 Cross Slope (Driveway)SF15652.3to $40 $6201612955ft feet 2.0-3.0653.6 Cross Slope (Driveway)SF61665.7to $40 $2,4201612965ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 729 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side HARRIET ST Survey Street Name Starting Street Name 2640 E 26TH ST End Street Name 1912041332 Run ID E 26Th St 68 ID Sidewalk Width Priority feet 2.0-3.0670.7 Cross Slope (Driveway)SF119694.4to $40 $4,7401612975ft $112,135.00TOTAL COST FOR:E 26TH STSside of Starting at:HARRIET ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 730 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side MINERVA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911211616 Run ID E 26Th St 63 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF648.2to $120 $7,6261415898ft feet 4.0-5.08.2 Cross Slope (PAR)SF4714.3to $120 $5,6731415908ft feet 3.0-4.016.8 Cross Slope (PAR)SF1618.8to $120 $1,8601415918ft feet 2.0-3.018.8 Cross Slope (PAR)SF3723.6to $120 $4,4641415928ft feet 1.4320.5 Vertical Change REF821.5to133409 8 ft feet 4.0-5.023.6 Cross Slope (PAR)SF5130.2to $120 $6,1381415938ft feet 5.0-6.032.4 Cross Slope (PAR)SF1233.9to $120 $1,3951415948ft feet 4.0-5.037.2 Cross Slope (PAR)SF12252.9to $120 $14,6011415958ft feet 5.0-6.057.2 Cross Slope (PAR)SF958.3to $120 $1,0231415968ft feet 6.0-7.058.6 Cross Slope (PAR)SF959.7to $120 $1,0231415978ft feet 5.0-6.059.7 Cross Slope (PAR)SF960.9to $120 $1,1161415988ft feet 6.0-7.060.9 Cross Slope (PAR)SF5067.3to $120 $5,9521415998ft feet .3665.6 Vertical Change REF866.6to133410 8 ft feet 6.0-7.069.8 Cross Slope (PAR)SF1271.3to $120 $1,3951416008ft feet 5.0-6.071.3 Cross Slope (PAR)SF2174.0to $120 $2,5111416018ft feet 3.0-4.074.4 Cross Slope (PAR)SF7183.6to $120 $8,5561416028ft feet 5.0-6.083.6 Cross Slope (PAR)SF1285.2to $120 $1,4881416038ft feet .5987.0 Vertical Change SF888.0to $75 $5811334118ft feet 3.0-4.088.4 Cross Slope (PAR)SF1490.2to $120 $1,6741416048ft feet 3.0-4.097.5 Cross Slope (PAR)SF33101.7to $120 $3,9061416058ft feet 2.0-3.0103.3 Cross Slope (PAR)SF116118.3to $120 $13,9501416068ft feet 2.0-3.0121.4 Cross Slope (PAR)SF23124.4to $120 $2,7901416078ft feet 2.0-3.0128.4 Cross Slope (PAR)SF33132.6to $120 $3,9061416088ft feet 2.0-3.0136.1 Cross Slope (PAR)SF192160.9to $120 $23,0641416098ft feet .5157.6 Vertical Change REF8158.6to133412 8 ft feet 2.0-3.0164.3 Cross Slope (PAR)SF9165.5to $120 $1,1161416108ft feet 2.0-3.0171.0 Cross Slope (PAR)SF294208.9to $120 $35,2471416118ft feet .32183.4 Vertical Change REF8184.4to133413 8 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 731 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side MINERVA ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911211616 Run ID E 26Th St 63 ID Sidewalk Width Priority feet 4.0-5.0211.2 Cross Slope (PAR)SF26214.5to $120 $3,0691416128ft feet 2.0-3.0223.3 Cross Slope (PAR)SF52230.0to $120 $6,2311416138ft feet 4.0-5.0230.3 Cross Slope (PAR)SF25233.5to $120 $2,9761416148ft feet233.5 Driveway249.5to164552 feet 6.0-7.0251.7 Cross Slope (PAR)SF12253.3to $120 $1,4881416158ft feet 5.0-6.0253.3 Cross Slope (PAR)SF43258.9to $120 $5,2081416168ft feet 4.0-5.0261.2 Cross Slope (PAR)SF29265.0to $120 $3,5341416178ft feet 6.0-7.0265.0 Cross Slope (PAR)SF42270.4to $120 $5,0221416188ft feet 5.0-6.0270.8 Cross Slope (PAR)SF33275.0to $120 $3,9061416198ft feet 3.0-4.0275.0 Cross Slope (PAR)SF19277.5to $120 $2,3251416208ft feet 2.0-3.0277.5 Cross Slope (PAR)SF29281.2to $120 $3,4411416218ft feet 4.0-5.0282.0 Cross Slope (PAR)SF227311.3to $120 $27,2491416228ft feet 2.29297.5 Vertical Change REF8298.5to133414 8 ft feet 2.0-3.0311.3 Cross Slope (PAR)SF59318.9to $120 $7,0681416238ft feet 4.0-5.0320.0 Cross Slope (PAR)SF22322.9to $120 $2,6971416248ft feet 4.0-5.0326.2 Cross Slope (PAR)SF288363.3to $120 $34,5031416258ft feet .44352.3 Vertical Change REF8353.3to133415 8 ft feet363.3 Driveway391.3to164553 feet .31372.6 Vertical Change REF8373.6to133416 8 ft feet .44377.1 Vertical Change REF8378.1to133417 8 ft $259,772.25TOTAL COST FOR:E 26TH STNside of Starting at:MINERVA ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 732 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S BONNIE BEACH PL Survey Street Name Starting Street Name 4366 E 26TH ST End Street Name 2001160944 Run ID E 26Th St 66.25 ID Sidewalk Width Priority feet 4.0-5.00.8 Cross Slope (PAR)SF315.4to $120 $3,7261578767ft feet 5.0-6.08.0 Cross Slope (PAR)SF79.1to $120 $8911578777ft feet 2.0-3.012.5 Cross Slope (PAR)SF2616.4to $120 $3,1591578787ft feet16.5 Continuous Width REF717.5to167003 7 ft feet 4.0-5.016.6 Cross Slope (PAR)SF3621.9to $120 $4,2931578797ft feet 2.0-3.026.0 Cross Slope (PAR)SF4532.7to $120 $5,4271578807ft feet28.4 Continuous Width REF729.4to167330 7 ft feet 4.0-5.034.1 Cross Slope (PAR)SF1736.6to $120 $2,0251578817ft feet 2.0-3.039.0 Cross Slope (PAR)SF1641.4to $120 $1,9441578827ft feet 2.0-3.053.3 Cross Slope (PAR)SF6563.0to $120 $7,8571578837ft feet 4.0-5.063.0 Cross Slope (PAR)SF1765.5to $120 $2,0251578847ft feet 2.0-3.066.3 Cross Slope (PAR)SF1168.0to $120 $1,3771578857ft feet 2.0-3.070.7 Cross Slope (PAR)SF771.7to $120 $8101578867ft feet 3.0-4.073.8 Cross Slope (PAR)SF1676.1to $120 $1,8631578877ft feet 2.0-3.082.0 Cross Slope (PAR)SF8194.0to $120 $9,7201578887ft feet 4.0-5.096.4 Cross Slope (PAR)SF113113.1to $120 $13,5271578897ft feet 4.0-5.0115.8 Cross Slope (PAR)SF13117.7to $120 $1,5391578907ft feet 7.0-8.0119.4 Cross Slope (PAR)SF52127.1to $120 $6,2371578917ft feet 2.0-3.0129.7 Cross Slope (PAR)SF78141.3to $120 $9,3961578927ft feet 2.0-3.0144.2 Cross Slope (PAR)SF20147.2to $120 $2,4301578937ft feet147.2 Driveway182.9to165931 feet 3.0-4.0185.1 Cross Slope (PAR)SF70195.4to $120 $8,3431578947ft feet 2.0-3.0195.4 Cross Slope (PAR)SF47202.4to $120 $5,6701578957ft feet 3.31202.1 Vertical Change REF7203.1to138113 7 ft feet 2.0-3.0208.3 Cross Slope (PAR)SF61217.4to $120 $7,3711578967ft feet 5.0-6.0215.0 Running Slope REF11216.6to166614 7 ft feet217.4 Driveway252.3to165932 feet 2.0-3.0253.4 Cross Slope (PAR)SF28257.6to $120 $3,4021578977ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 733 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S BONNIE BEACH PL Survey Street Name Starting Street Name 4366 E 26TH ST End Street Name 2001160944 Run ID E 26Th St 66.25 ID Sidewalk Width Priority feet 4.0-5.0261.0 Cross Slope (PAR)SF81273.0to $120 $9,7201578987ft feet270.6 Continuous Width SF7271.6to $120 $8101678627ft feet 6.0-7.0273.0 Cross Slope (PAR)SF12274.8to $120 $1,4581578997ft feet 5.0-6.0274.8 Cross Slope (PAR)SF14276.8to $120 $1,6201579007ft feet 3.0-4.0277.2 Cross Slope (PAR)SF18279.9to $120 $2,1871579017ft feet283.2 Continuous Width SF7284.2to $120 $8101678617ft feet 3.0-4.0284.7 Cross Slope (PAR)SF53292.5to $120 $6,3181579027ft feet .87290.6 Vertical Change REF7291.6to138114 7 ft feet 2.0-3.0292.8 Cross Slope (PAR)SF146314.4to $120 $17,4961579037ft feet 2.0-3.0327.8 Cross Slope (PAR)SF98342.3to $120 $11,7451579047ft feet343.0 Driveway368.2to165933 feet .68367.5 Vertical Change REF7368.5to138115 7 ft feet 3.0-4.0370.2 Cross Slope (PAR)SF71380.7to $120 $8,5051579057ft feet374.8 Continuous Width REF7375.8to167762 7 ft feet 3.0-4.0383.3 Cross Slope (PAR)SF9384.6to $120 $1,0531579067ft feet 2.0-3.0384.6 Cross Slope (PAR)SF70395.0to $120 $8,4241579077ft feet 3.0-4.0402.3 Cross Slope (PAR)SF22405.6to $120 $2,6731579087ft feet 2.0-3.0407.3 Cross Slope (PAR)SF15409.5to $120 $1,7821579097ft feet 2.0-3.0415.6 Cross Slope (PAR)SF74426.6to $120 $8,9101579107ft feet 3420.5 Vertical Change REF7421.5to138116 7 ft feet 4.0-5.0427.5 Cross Slope (PAR)SF15429.7to $120 $1,7821579117ft feet 2.0-3.0431.1 Cross Slope (PAR)SF69441.3to $120 $8,2621579127ft feet .31435.7 Vertical Change REF7436.7to138117 7 ft feet 2.0-3.0449.3 Cross Slope (PAR)SF51456.8to $120 $6,0751579137ft feet 3.0-4.0459.3 Cross Slope (PAR)SF73470.1to $120 $8,7481579147ft feet 5.0-6.0470.5 Cross Slope (PAR)SF32475.2to $120 $3,8071579157ft feet 2.0-3.0482.0 Cross Slope (PAR)SF7483.0to $120 $8101579167ft feet 2.0-3.0488.9 Cross Slope (PAR)SF8490.1to $120 $9721579177ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 734 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S BONNIE BEACH PL Survey Street Name Starting Street Name 4366 E 26TH ST End Street Name 2001160944 Run ID E 26Th St 66.25 ID Sidewalk Width Priority feet 2.0-3.0494.3 Cross Slope (PAR)SF15496.5to $120 $1,7821579187ft feet 3.0-4.0501.0 Cross Slope (PAR)SF20504.0to $120 $2,4301579197ft feet 5.0-6.0506.9 Cross Slope (PAR)SF25510.6to $120 $2,9971579207ft feet 4.0-5.0514.0 Cross Slope (PAR)SF17516.5to $120 $2,0251579217ft feet 4.0-5.0519.7 Cross Slope (PAR)SF196548.7to $120 $23,4901579227ft feet 1.9539.1 Vertical Change REF7540.1to138118 7 ft feet 2.0-3.0550.8 Cross Slope (PAR)SF34555.9to $120 $4,1311579237ft feet 3.0-4.0561.4 Cross Slope (PAR)SF21564.5to $120 $2,5111579247ft feet 2.0-3.0565.3 Cross Slope (PAR)SF39571.1to $120 $4,6981579257ft feet 5.0-6.0568.5 Running Slope REF8569.7to166615 7 ft feet571.3 Driveway604.7to165934 feet 2.0-3.0620.2 Cross Slope (PAR)SF26624.1to $120 $3,1591579267ft feet 2.0-3.0629.6 Cross Slope (PAR)SF17632.1to $120 $2,0251579277ft feet 2.0-3.0634.3 Cross Slope (PAR)SF47641.2to $120 $5,5891579287ft feet 2.0-3.0653.8 Cross Slope (PAR)SF11655.4to $120 $1,2961579297ft feet655.1 Continuous Width REF7656.1to167763 7 ft feet656.7 Driveway688.6to165935 feet 3.0-4.0690.8 Cross Slope (PAR)SF11692.5to $120 $1,3771579307ft feet 2.0-3.0692.5 Cross Slope (PAR)SF93706.3to $120 $11,1781579317ft feet -.27700.9 Vertical Change REF7701.9to138119 7 ft feet 2.0-3.0711.4 Cross Slope (PAR)SF28715.5to $120 $3,3211579327ft feet .3712.3 Vertical Change REF7713.3to138120 7 ft feet 2.0-3.0720.4 Cross Slope (PAR)SF134740.2to $120 $16,0381579337ft feet 2.0-3.0744.1 Cross Slope (PAR)SF11745.8to $120 $1,3771579347ft feet 2.0-3.0752.3 Cross Slope (PAR)SF10753.8to $120 $1,2151579357ft feet757.7 Driveway796.1to165936 feet 4.0-5.0796.1 Cross Slope (Driveway)SF15798.3to $40 $5941579367ft feet 3.0-4.0805.6 Cross Slope (PAR)SF27809.6to $120 $3,2401579377ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 735 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S BONNIE BEACH PL Survey Street Name Starting Street Name 4366 E 26TH ST End Street Name 2001160944 Run ID E 26Th St 66.25 ID Sidewalk Width Priority feet 3.0-4.0812.4 Cross Slope (PAR)SF36817.8to $120 $4,3741579387ft feet 3.0-4.0820.2 Cross Slope (PAR)SF38825.9to $120 $4,6171579397ft feet 3.0-4.0828.9 Cross Slope (PAR)SF84841.3to $120 $10,0441579407ft feet 2.0-3.0842.3 Cross Slope (PAR)SF111858.8to $120 $13,3651579417ft feet 2.42844.0 Vertical Change REF7845.0to138121 7 ft feet 4.0-5.0859.1 Cross Slope (PAR)SF28863.2to $120 $3,3211579427ft feet 3.0-4.0865.5 Cross Slope (PAR)SF32870.3to $120 $3,8881579437ft feet 4.0-5.0872.8 Cross Slope (PAR)SF155895.8to $120 $18,6301579447ft feet .44875.8 Vertical Change REF7876.8to138122 7 ft feet .37880.8 Vertical Change REF7881.8to138123 7 ft feet 2.0-3.0896.3 Cross Slope (PAR)SF67906.2to $120 $8,0191579457ft feet -.28896.8 Vertical Change REF7897.8to138124 7 ft feet909.1 Driveway959.3to165937 $377,730.00TOTAL COST FOR:E 26TH STSside of Starting at:S BONNIE BEACH PL October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 736 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW E 26TH ST Street Side S DOWNEY RD Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 2001171218 Run ID E 26Th St 50.75 ID Sidewalk Width Priority feet 3.0-4.00.2 Cross Slope (PAR)SF232.5to $120 $2,76015822310ft feet 4.0-5.05.1 Cross Slope (PAR)SF136.4to $120 $1,56015822410ft feet 2.0-3.07.8 Cross Slope (PAR)SF15022.8to $120 $18,00015822510ft feet 4.0-5.023.3 Cross Slope (PAR)SF9232.5to $120 $11,04015822610ft feet 2.0-3.033.9 Cross Slope (PAR)SF25459.3to $120 $30,48015822710ft feet 5.0-6.039.3 Running Slope REF1440.7to166623 10 ft feet 2.0-3.062.1 Cross Slope (PAR)SF6068.1to $120 $7,20015822810ft feet 2.0-3.083.0 Cross Slope (PAR)SF1184.1to $120 $1,32015822910ft feet 5.0-6.085.8 Cross Slope (PAR)SF3989.7to $120 $4,68015823010ft feet 3.0-4.089.9 Cross Slope (PAR)SF5995.8to $120 $7,08015823110ft feet 2.0-3.096.8 Cross Slope (PAR)SF3099.8to $120 $3,60015823210ft feet 4.0-5.0100.8 Cross Slope (PAR)SF458146.6to $120 $54,96015823310ft feet 2.0-3.0149.6 Cross Slope (PAR)SF74157.0to $120 $8,88015823410ft feet 2.0-3.0160.2 Cross Slope (PAR)SF39164.1to $120 $4,68015823510ft feet 2.0-3.0169.4 Cross Slope (PAR)SF81177.5to $120 $9,72015823610ft feet 3.0-4.0182.7 Cross Slope (PAR)SF11183.8to $120 $1,32015823710ft feet184.8 Driveway220.7to165962 feet 2.0-3.0220.9 Cross Slope (Driveway)SF24223.3to $40 $96015823810ft feet 2.0-3.0225.6 Cross Slope (PAR)SF18227.4to $120 $2,16015823910ft feet 4.0-5.0228.7 Cross Slope (PAR)SF138242.5to $120 $16,56015824010ft feet 2.0-3.0242.5 Cross Slope (PAR)SF144256.9to $120 $17,28015824110ft feet 2.0-3.0260.4 Cross Slope (PAR)SF10261.4to $120 $1,20015824210ft $205,440.00TOTAL COST FOR:E 26TH STSWside of Starting at:S DOWNEY RD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 737 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S INDIANA ST Survey Street Name Starting Street Name E 26TH ST End Street Name 2001160852 Run ID E 26Th St 42.75 ID Sidewalk Width Priority feet 5.0-6.00.0 Cross Slope (PAR)SF233.1to $120 $2,7901581498ft feet10.3 Cold Patch 2012.9to140559 8 ft feet -.5311.1 Vertical Change SF812.1to $75 $5631381678ft feet 3.0-4.012.9 Cross Slope (PAR)SF2716.5to $120 $3,2401581508ft feet 2.0-3.017.5 Cross Slope (PAR)SF17240.4to $120 $20,6101581518ft feet 4.0-5.040.4 Cross Slope (PAR)SF5647.9to $120 $6,7501581528ft feet 2.0-3.047.9 Cross Slope (PAR)SF15468.4to $120 $18,4501581538ft feet 2.0-3.071.8 Cross Slope (PAR)SF4277.4to $120 $5,0401581548ft feet 2.0-3.086.8 Cross Slope (PAR)SF2590.1to $120 $2,9701581558ft feet 2.0-3.092.3 Cross Slope (PAR)SF2295.2to $120 $2,6101581568ft feet 2.0-3.097.3 Cross Slope (PAR)SF90109.3to $120 $10,8001581578ft feet 4.0-5.0110.3 Cross Slope (PAR)SF8111.3to $120 $9001581588ft feet 2.0-3.0112.7 Cross Slope (PAR)SF30116.7to $120 $3,6001581598ft feet 4.0-5.0116.9 Cross Slope (PAR)SF29120.7to $120 $3,4201581608ft feet 2.0-3.0120.7 Cross Slope (PAR)SF129137.9to $120 $15,4801581618ft feet 2.0-3.0142.3 Cross Slope (PAR)SF118158.1to $120 $14,2201581628ft feet -.32158.4 Vertical Change LF8159.4to $75 $5631381688ft feet 2.0-3.0160.3 Cross Slope (PAR)SF10161.6to $120 $1,1701581638ft feet .46160.6 Vertical Change REF8161.6to138169 8 ft feet 4.0-5.0162.0 Cross Slope (PAR)SF16164.1to $120 $1,8901581648ft feet165.4 Driveway195.3to165958 feet 2.0-3.0195.3 Cross Slope (Driveway)SF10196.6to $40 $3901581658ft feet 2.0-3.0204.3 Cross Slope (PAR)SF131221.8to $120 $15,7501581668ft feet221.8 Driveway256.2to165959 feet -.4254.7 Vertical Change REF8255.7to138170 8 ft feet 3.0-4.0256.2 Cross Slope (Driveway)SF11257.6to $40 $4201581678ft feet 2.0-3.0257.6 Cross Slope (PAR)SF21260.4to $120 $2,5201581688ft feet 2.0-3.0267.3 Cross Slope (PAR)SF36272.1to $120 $4,3201581698ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 738 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S INDIANA ST Survey Street Name Starting Street Name E 26TH ST End Street Name 2001160852 Run ID E 26Th St 42.75 ID Sidewalk Width Priority feet 2.0-3.0275.9 Cross Slope (PAR)SF8276.9to $120 $9001581708ft feet 2.0-3.0279.8 Cross Slope (PAR)SF68288.8to $120 $8,1001581718ft feet 2.0-3.0306.3 Cross Slope (PAR)SF94318.8to $120 $11,2501581728ft feet 2.0-3.0330.4 Cross Slope (PAR)SF53337.4to $120 $6,3001581738ft feet 2.0-3.0344.8 Cross Slope (PAR)SF49351.3to $120 $5,8501581748ft feet 5.0-6.0345.3 Running Slope REF18347.7to166621 8 ft feet 2.0-3.0355.3 Cross Slope (PAR)SF38360.3to $120 $4,5001581758ft feet 2.0-3.0363.2 Cross Slope (PAR)SF43368.9to $120 $5,1301581768ft feet 4.0-5.0368.9 Cross Slope (PAR)SF16371.0to $120 $1,8901581778ft feet 3.0-4.0373.8 Cross Slope (PAR)SF8374.8to $120 $9001581788ft feet 2.0-3.0375.9 Cross Slope (PAR)SF71385.3to $120 $8,4601581798ft feet 6.0-7.0381.3 Running Slope REF18383.7to166622 8 ft feet 3.0-4.0390.1 Cross Slope (PAR)SF43395.8to $120 $5,1301581808ft feet 2.0-3.0395.8 Cross Slope (PAR)SF164417.7to $120 $19,7101581818ft feet 2.0-3.0441.6 Cross Slope (PAR)SF59449.4to $120 $7,0201581828ft feet 3.0-4.0459.6 Cross Slope (PAR)SF8460.6to $120 $9001581838ft feet 2.0-3.0461.3 Cross Slope (PAR)SF8462.3to $120 $9001581848ft feet 3.0-4.0465.7 Cross Slope (PAR)SF9466.9to $120 $1,0801581858ft feet 5.0-6.0473.3 Cross Slope (PAR)SF21476.1to $120 $2,5201581868ft feet 2.0-3.0477.3 Cross Slope (PAR)SF49483.8to $120 $5,8501581878ft feet 3.0-4.0486.8 Cross Slope (PAR)SF32491.0to $120 $3,7801581888ft feet 4.0-5.0501.3 Cross Slope (PAR)SF29505.2to $120 $3,5101581898ft feet 2.0-3.0505.2 Cross Slope (PAR)SF32509.5to $120 $3,8701581908ft feet510.1 Driveway542.3to165960 feet 3.0-4.0544.4 Cross Slope (PAR)SF10545.7to $120 $1,1701581918ft feet 2.0-3.0545.9 Cross Slope (PAR)SF13547.6to $120 $1,5301581928ft feet 4.0-5.0550.3 Cross Slope (PAR)SF9551.5to $120 $1,0801581938ft feet 3.0-4.0554.5 Cross Slope (PAR)SF11556.0to $120 $1,3501581948ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 739 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S INDIANA ST Survey Street Name Starting Street Name E 26TH ST End Street Name 2001160852 Run ID E 26Th St 42.75 ID Sidewalk Width Priority feet 2.0-3.0560.9 Cross Slope (PAR)SF62569.2to $120 $7,4701581958ft feet 2.0-3.0575.3 Cross Slope (PAR)SF73585.0to $120 $8,7301581968ft feet 2.0-3.0590.9 Cross Slope (PAR)SF47597.1to $120 $5,5801581978ft feet 2.0-3.0609.5 Cross Slope (PAR)SF25612.8to $120 $2,9701581988ft feet 2.0-3.0616.5 Cross Slope (PAR)SF41621.9to $120 $4,8601581998ft feet 2.0-3.0635.4 Cross Slope (PAR)SF44641.2to $120 $5,2201582008ft feet644.3 Driveway680.3to165961 feet 3.06644.4 Vertical Change REF8645.4to138171 8 ft feet .43662.0 Vertical Change REF8663.0to138172 8 ft feet 2.0-3.0680.3 Cross Slope (Driveway)SF15682.3to $40 $6001582018ft feet 3.0-4.0684.9 Cross Slope (PAR)SF8685.9to $120 $9001582028ft feet 2.0-3.0687.1 Cross Slope (PAR)SF9688.3to $120 $1,0801582038ft feet 2.0-3.0691.3 Cross Slope (PAR)SF11692.8to $120 $1,3501582048ft feet .46702.1 Vertical Change LF8703.1to $75 $5631381738ft feet 2.0-3.0704.0 Cross Slope (PAR)SF29707.8to $120 $3,4201582058ft feet 4.0-5.0709.0 Cross Slope (PAR)SF29712.8to $120 $3,4201582068ft feet 2.0-3.0715.1 Cross Slope (PAR)SF11716.6to $120 $1,3501582078ft feet 2.0-3.0723.8 Cross Slope (PAR)SF8724.8to $120 $9001582088ft feet 2.0-3.0730.3 Cross Slope (PAR)SF11731.8to $120 $1,3501582098ft feet 2.0-3.0736.4 Cross Slope (PAR)SF65745.1to $120 $7,8301582108ft feet 2.0-3.0773.1 Cross Slope (PAR)SF16775.2to $120 $1,8901582118ft feet 2.0-3.0787.4 Cross Slope (PAR)SF23790.5to $120 $2,7901582128ft feet 2.0-3.0794.3 Cross Slope (PAR)SF23797.3to $120 $2,7001582138ft feet .55795.0 Vertical Change REF8796.0to138174 8 ft feet 2.0-3.0800.6 Cross Slope (PAR)SF15802.6to $120 $1,8001582148ft feet 2.0-3.0807.2 Cross Slope (PAR)SF31811.3to $120 $3,6901582158ft feet 2.0-3.0859.9 Cross Slope (PAR)SF29863.8to $120 $3,5101582168ft feet -.27866.7 Vertical Change REF8867.7to138175 8 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 740 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S INDIANA ST Survey Street Name Starting Street Name E 26TH ST End Street Name 2001160852 Run ID E 26Th St 42.75 ID Sidewalk Width Priority feet 2.0-3.0867.5 Cross Slope (PAR)SF10868.8to $120 $1,1701582178ft feet 2.0-3.0875.8 Cross Slope (PAR)SF32880.1to $120 $3,8701582188ft feet 2.0-3.0950.6 Cross Slope (PAR)SF41956.1to $120 $4,9501582198ft feet 2.0-3.0962.3 Cross Slope (PAR)SF9963.5to $120 $1,0801582208ft feet 3.0-4.0992.4 Cross Slope (PAR)SF17994.6to $120 $1,9801582218ft feet 2.0-3.0995.6 Cross Slope (PAR)SF441001.5to $120 $5,3101582228ft $343,477.50TOTAL COST FOR:E 26TH STSside of Starting at:S INDIANA ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 741 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911211524 Run ID E 26Th St 45.5 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF344.4to $120 $4,0921417688ft feet 4.0-5.04.4 Cross Slope (PAR)SF20931.4to $120 $25,1101417698ft feet 2.0-3.033.3 Cross Slope (PAR)SF6641.8to $120 $7,9051417708ft feet 2.0-3.044.2 Cross Slope (PAR)SF5351.1to $120 $6,4171417718ft feet 3.0-4.057.5 Cross Slope (PAR)SF10871.4to $120 $12,9271417728ft feet 2.0-3.072.1 Cross Slope (PAR)SF7882.2to $120 $9,3931417738ft feet 6.0-7.084.4 Cross Slope (PAR)SF885.4to $120 $9301417748ft feet 4.0-5.087.8 Cross Slope (PAR)SF1089.1to $120 $1,2091417758ft feet .8688.6 Vertical Change REF889.6to133475 8 ft feet 3.0-4.091.4 Cross Slope (PAR)SF1092.7to $120 $1,2091417768ft feet 4.0-5.095.3 Cross Slope (PAR)SF53102.1to $120 $6,3241417778ft feet 296.7 Vertical Change REF897.7to133476 8 ft feet 2.0-3.0102.1 Cross Slope (PAR)SF40107.2to $120 $4,7431417788ft $80,259.00TOTAL COST FOR:E 26TH STSside of Starting at:S SANTA FE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 742 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name 2677 E 26TH ST End Street Name 1912041602 Run ID E 26Th St 89.5 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF244.7to $120 $2,8201606385ft feet 3.482.3 Vertical Change SF53.3to $75 $3751389785ft feet 4.0-5.04.7 Cross Slope (PAR)SF2710.2to $120 $3,3001606395ft feet9.4 Continuous Width SF510.4to $120 $6001669845ft feet 6.0-7.011.2 Cross Slope (PAR)SF1113.3to $120 $1,2601606405ft feet 3.0-4.015.8 Cross Slope (PAR)SF817.3to $120 $9001606415ft feet 2.0-3.026.8 Cross Slope (PAR)SF9746.1to $120 $11,5801606425ft feet37.4 Continuous Width SF538.4to $120 $6001675825ft feet 2.0-3.048.4 Cross Slope (PAR)SF6962.1to $120 $8,2201606435ft feet50.6 Continuous Width SF551.6to $120 $6001676065ft feet 3.0-4.064.8 Cross Slope (PAR)SF665.9to $120 $6601606445ft feet 2.0-3.065.9 Cross Slope (PAR)SF1468.7to $120 $1,6801606455ft feet 4.0-5.070.8 Cross Slope (PAR)SF1373.4to $120 $1,5601606465ft feet 2.0-3.075.3 Cross Slope (PAR)SF3181.4to $120 $3,6601606475ft feet 2.0-3.085.8 Cross Slope (PAR)SF2390.3to $120 $2,7001606485ft feet 4.0-5.091.1 Cross Slope (PAR)SF115114.1to $120 $13,8001606495ft feet97.9 Continuous Width REF598.9to167768 5 ft feet 2.0-3.0114.1 Cross Slope (PAR)SF9115.8to $120 $1,0201606505ft feet 2.0-3.0118.4 Cross Slope (PAR)SF6119.5to $120 $6601606515ft feet 2.0-3.0123.3 Cross Slope (PAR)SF64136.0to $120 $7,6201606525ft feet 3.0-4.0140.9 Cross Slope (PAR)SF7142.3to $120 $8401606535ft feet145.8 Continuous Width REF5146.8to167769 5 ft feet 2.0-3.0146.9 Cross Slope (PAR)SF44155.7to $120 $5,2801606545ft feet155.7 Driveway186.4to166160 feet .39170.3 Vertical Change REF5171.3to138979 5 ft feet 2.0-3.0186.4 Cross Slope (Driveway)SF51196.6to $40 $2,0401606555ft feet197.9 Driveway226.7to166161 feet -.27215.9 Vertical Change REF5216.9to138980 5 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 743 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name 2677 E 26TH ST End Street Name 1912041602 Run ID E 26Th St 89.5 ID Sidewalk Width Priority feet 6.0-7.0226.8 Cross Slope (Driveway)SF8228.3to $40 $3001606565ft feet 5.0-6.0228.3 Cross Slope (PAR)SF32234.7to $120 $3,8401606575ft feet 3.0-4.0235.3 Cross Slope (PAR)SF11237.5to $120 $1,3201606585ft feet 3.0-4.0241.9 Cross Slope (PAR)SF12244.3to $120 $1,4401606595ft feet 2.0-3.0244.3 Cross Slope (PAR)SF11246.4to $120 $1,2601606605ft feet246.9 Continuous Width SF5247.9to $120 $6001670385ft feet 2.0-3.0250.8 Cross Slope (PAR)SF83267.3to $120 $9,9001606615ft feet264.8 Continuous Width SF5265.8to $120 $6001675475ft feet 2.0-3.0269.9 Cross Slope (PAR)SF43278.5to $120 $5,1601606625ft feet .37327.2 Vertical Change LF5328.2to $75 $3751389815ft feet 2.0-3.0331.4 Cross Slope (PAR)SF11333.5to $120 $1,2601606635ft feet 4.0-5.0334.1 Cross Slope (PAR)SF6335.3to $120 $7201606645ft feet 2.0-3.0335.8 Cross Slope (PAR)SF7337.1to $120 $7801606655ft feet 2.0-3.0352.8 Cross Slope (PAR)SF18356.3to $120 $2,1001606665ft feet 2.0-3.0359.0 Cross Slope (PAR)SF138386.5to $120 $16,5001606675ft feet371.0 Continuous Width SF5372.0to $120 $6001673775ft feet 2.0-3.0389.6 Cross Slope (PAR)SF49399.4to $120 $5,8801606685ft feet397.7 Continuous Width SF5398.7to $120 $6001670425ft feet403.5 Driveway446.7to166162 feet 2.0-3.0446.7 Cross Slope (Driveway)SF6447.8to $40 $2201606695ft feet455.1 Cold Patch 19458.8to140574 5 ft feet .76457.5 Vertical Change SF5458.5to $75 $3751389825ft feet458.8 Continuous Width REF5459.8to166905 5 ft feet -.29528.2 Vertical Change LF5529.2to $75 $3751389835ft feet 2.0-3.0542.8 Cross Slope (PAR)SF6544.0to $120 $7201606705ft feet -.78545.4 Vertical Change SF5546.4to $75 $3751389845ft feet .26579.9 Vertical Change LF5580.9to $75 $3751389855ft feet -.36597.1 Vertical Change LF5598.1to $75 $3751389865ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 744 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name 2677 E 26TH ST End Street Name 1912041602 Run ID E 26Th St 89.5 ID Sidewalk Width Priority feet 2.0-3.0683.8 Cross Slope (PAR)SF9685.5to $120 $1,0201606715ft feet 2.0-3.0705.0 Cross Slope (PAR)SF79720.7to $120 $9,4201606725ft feet 2.0-3.0731.4 Cross Slope (PAR)SF12733.7to $120 $1,3801606735ft feet734.8 Cold Patch 47744.1to140575 5 ft feet -.26735.4 Vertical Change LF5736.4to $75 $3751389875ft feet 2.0-3.0744.1 Cross Slope (PAR)SF9745.9to $120 $1,0801606745ft $141,100.00TOTAL COST FOR:E 26TH STNside of Starting at:S SOTO ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 745 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151510 Run ID E 26Th St 80.75 ID Sidewalk Width Priority feet 2.0-3.01.5 Cross Slope (PAR)SF7515.8to $120 $9,0091543445ft feet 4.0-5.017.1 Cross Slope (PAR)SF2021.0to $120 $2,4571543455ft feet 2.0-3.023.3 Cross Slope (PAR)SF8439.3to $120 $10,0801543465ft feet 2.0-3.041.7 Cross Slope (PAR)SF6954.8to $120 $8,2531543475ft feet 2.0-3.061.8 Cross Slope (PAR)SF1564.6to $120 $1,7641543485ft feet 3.0-4.076.0 Cross Slope (PAR)SF877.6to $120 $1,0081543495ft feet 2.0-3.078.0 Cross Slope (PAR)SF3885.2to $120 $4,5361543505ft feet 2.0-3.089.9 Cross Slope (PAR)SF1893.3to $120 $2,1421543515ft feet 3.0-4.096.0 Cross Slope (PAR)SF597.0to $120 $6301543525ft feet 2.0-3.097.3 Cross Slope (PAR)SF64109.4to $120 $7,6231543535ft feet 2.0-3.0111.8 Cross Slope (PAR)SF7113.2to $120 $8821543545ft feet 2.0-3.0115.4 Cross Slope (PAR)SF9117.1to $120 $1,0711543555ft feet 2.0-3.0121.3 Cross Slope (PAR)SF12123.6to $120 $1,4491543565ft feet 2.0-3.0127.6 Cross Slope (PAR)SF91145.0to $120 $10,9621543575ft feet 7.0-8.0138.9 Running Slope REF9140.7to166513 5 ft feet 4.0-5.0145.0 Cross Slope (PAR)SF6146.1to $120 $6931543585ft feet146.3 Driveway201.2to165735 feet 4.0-5.0201.2 Cross Slope (Driveway)SF78216.0to $40 $3,1081543595ft feet 2.0-3.0217.3 Cross Slope (PAR)SF8218.8to $120 $9451543605ft feet 2.0-3.0221.2 Cross Slope (PAR)SF64233.3to $120 $7,6231543615ft feet 3.0-4.0238.7 Cross Slope (PAR)SF6239.9to $120 $7561543625ft feet 2.0-3.0240.9 Cross Slope (PAR)SF161271.5to $120 $19,2781543635ft feet 2.0-3.0273.7 Cross Slope (PAR)SF37280.8to $120 $4,4731543645ft feet 5.0-6.0285.2 Running Slope SF15288.0to $120 $1,7641665145ft feet288.0 Driveway322.0to165736 feet 2.0-3.0322.0 Cross Slope (Driveway)SF7323.4to $40 $2941543655ft feet 4.0-5.0333.3 Cross Slope (PAR)SF26338.2to $120 $3,0871543665ft feet 2.0-3.0339.8 Cross Slope (PAR)SF123363.3to $120 $14,8051543675ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 746 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151510 Run ID E 26Th St 80.75 ID Sidewalk Width Priority feet 4.0-5.0365.8 Cross Slope (PAR)SF20369.7to $120 $2,4571543685ft feet 2.0-3.0370.1 Cross Slope (PAR)SF57381.0to $120 $6,8671543695ft feet 4.0-5.0388.2 Cross Slope (PAR)SF7389.6to $120 $8821543705ft feet 3.0-4.0394.6 Cross Slope (PAR)SF41402.5to $120 $4,9771543715ft feet 2.0-3.0403.3 Cross Slope (PAR)SF26408.3to $120 $3,1501543725ft feet 2.0-3.0411.7 Cross Slope (PAR)SF6412.9to $120 $7561543735ft feet 2.0-3.0416.4 Cross Slope (PAR)SF54426.6to $120 $6,4261543745ft feet 2.0-3.0429.8 Cross Slope (PAR)SF40437.4to $120 $4,7881543755ft feet 4.0-5.0437.4 Cross Slope (PAR)SF15440.3to $120 $1,8271543765ft feet 2.0-3.0443.0 Cross Slope (PAR)SF6444.2to $120 $7561543775ft feet 4.0-5.0448.0 Cross Slope (PAR)SF14450.7to $120 $1,7011543785ft feet450.7 Cold Patch 14453.3to140507 5 ft feet 4.0-5.0453.3 Cross Slope (PAR)SF32459.4to $120 $3,8431543795ft feet 3.0-4.0462.4 Cross Slope (PAR)SF8464.0to $120 $1,0081543805ft feet 2.0-3.0468.8 Cross Slope (PAR)SF44477.1to $120 $5,2291543815ft feet 5.0-6.0479.1 Cross Slope (PAR)SF17482.3to $120 $2,0161543825ft feet 3.0-4.0482.9 Cross Slope (PAR)SF88499.6to $120 $10,5211543835ft feet 3.0-4.0501.8 Cross Slope (PAR)SF45510.4to $120 $5,4181543845ft feet 4.0-5.0515.6 Cross Slope (PAR)SF65528.0to $120 $7,8121543855ft feet 2.0-3.0529.3 Cross Slope (PAR)SF9531.0to $120 $1,0711543865ft feet 3.0-4.0533.1 Cross Slope (PAR)SF9534.8to $120 $1,0711543875ft feet 2.0-3.0535.3 Cross Slope (PAR)SF5536.3to $120 $6301543885ft feet .41538.7 Vertical Change LF5539.7to $75 $3941374705ft feet 4.0-5.0540.1 Cross Slope (PAR)SF31546.0to $120 $3,7171543895ft feet547.8 Driveway644.1to165737 feet .39603.2 Vertical Change REF5604.2to137471 5 ft feet -.28604.9 Vertical Change REF5605.9to137472 5 ft feet .3621.3 Vertical Change REF5622.3to137473 5 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 747 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151510 Run ID E 26Th St 80.75 ID Sidewalk Width Priority feet 4.0-5.0644.1 Cross Slope (Driveway)SF98662.8to $40 $3,9271543905ft feet647.0 Continuous Width SF5648.0to $120 $6301675435ft feet658.2 Continuous Width REF5659.2to167332 5 ft feet 2.0-3.0664.3 Cross Slope (PAR)SF8665.8to $120 $9451543915ft feet 4.0-5.0667.4 Cross Slope (PAR)SF28672.8to $120 $3,4021543925ft feet 2.0-3.0673.7 Cross Slope (PAR)SF8675.3to $120 $1,0081543935ft feet676.3 Continuous Width REF5677.3to166855 5 ft feet 2.0-3.0678.8 Cross Slope (PAR)SF13681.2to $120 $1,5121543945ft feet 4.0-5.0681.3 Cross Slope (PAR)SF53691.3to $120 $6,3001543955ft feet684.4 Continuous Width SF5685.4to $120 $6301675995ft feet 2.0-3.0693.3 Cross Slope (PAR)SF35700.0to $120 $4,2211543965ft feet 2.0-3.0705.1 Cross Slope (PAR)SF17708.4to $120 $2,0791543975ft feet 2.0-3.0719.2 Cross Slope (PAR)SF28724.6to $120 $3,4021543985ft feet 4.0-5.0726.3 Cross Slope (PAR)SF27731.5to $120 $3,2761543995ft feet 2.0-3.0732.7 Cross Slope (PAR)SF19736.3to $120 $2,2681544005ft feet 2.0-3.0738.8 Cross Slope (PAR)SF60750.3to $120 $7,2451544015ft feet 3.0-4.0755.7 Cross Slope (PAR)SF23760.0to $120 $2,7091544025ft feet 2.0-3.0760.0 Cross Slope (PAR)SF23764.3to $120 $2,7091544035ft feet 3.0-4.0767.3 Cross Slope (PAR)SF34773.7to $120 $4,0321544045ft feet 3.0-4.0777.7 Cross Slope (PAR)SF31783.6to $120 $3,7171544055ft feet 2.0-3.0783.8 Cross Slope (PAR)SF69796.9to $120 $8,2531544065ft feet790.8 Continuous Width SF5791.8to $120 $6301676575ft feet 3.0-4.0799.0 Cross Slope (PAR)SF35805.6to $120 $4,1581544075ft feet 2.0-3.0806.6 Cross Slope (PAR)SF32812.7to $120 $3,8431544085ft feet 3.0-4.0816.3 Cross Slope (PAR)SF16819.4to $120 $1,9531544095ft feet 2.0-3.0820.8 Cross Slope (PAR)SF59832.1to $120 $7,1191544105ft feet 2.0-3.0834.3 Cross Slope (PAR)SF247881.4to $120 $29,6731544115ft feet 4.0-5.0882.3 Cross Slope (PAR)SF23886.7to $120 $2,7721544125ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 748 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151510 Run ID E 26Th St 80.75 ID Sidewalk Width Priority feet 2.0-3.0888.1 Cross Slope (PAR)SF38895.3to $120 $4,5361544135ft feet890.1 Continuous Width SF5891.1to $120 $6301676585ft feet 4.0-5.0896.2 Cross Slope (PAR)SF27901.4to $120 $3,2761544145ft feet 3.0-4.0903.8 Cross Slope (PAR)SF11905.9to $120 $1,3231544155ft feet906.8 Driveway941.8to165738 feet .3911.0 Vertical Change REF5912.0to137474 5 ft feet 3.0-4.0942.8 Cross Slope (PAR)SF8944.4to $120 $1,0081544165ft feet 2.0-3.0945.6 Cross Slope (PAR)SF29951.2to $120 $3,5281544175ft feet946.8 Continuous Width REF5947.8to166883 5 ft feet952.0 Driveway988.3to165739 feet 3.0-4.0988.3 Cross Slope (Driveway)SF11990.4to $40 $4411544185ft feet 3.3991.1 Vertical Change REF5992.1to137475 5 ft feet 2.0-3.0991.6 Cross Slope (PAR)SF14994.2to $120 $1,6381544195ft feet 2.0-3.01003.4 Cross Slope (PAR)SF351010.1to $120 $4,2211544205ft feet1008.3 Continuous Width REF51009.3to167340 5 ft feet 2.0-3.01021.7 Cross Slope (PAR)SF221025.9to $120 $2,6461544215ft feet 2.0-3.01030.8 Cross Slope (PAR)SF61032.0to $120 $7561544225ft feet 2.0-3.01041.9 Cross Slope (PAR)SF111044.0to $120 $1,3231544235ft feet 2.0-3.01049.1 Cross Slope (PAR)SF121051.3to $120 $1,3861544245ft feet 4.0-5.01051.3 Cross Slope (PAR)SF591062.6to $120 $7,1191544255ft feet 3.0-4.01064.8 Cross Slope (PAR)SF201068.7to $120 $2,4571544265ft feet 2.0-3.01070.8 Cross Slope (PAR)SF561081.4to $120 $6,6781544275ft feet 4.0-5.01082.6 Cross Slope (PAR)SF161085.7to $120 $1,9531544285ft feet 2.0-3.01090.0 Cross Slope (PAR)SF161093.0to $120 $1,8901544295ft feet 2.0-3.01106.6 Cross Slope (PAR)SF61107.7to $120 $6931544305ft feet 3.0-4.01110.3 Cross Slope (PAR)SF91112.1to $120 $1,1341544315ft feet 2.0-3.01117.0 Cross Slope (PAR)SF131119.4to $120 $1,5121544325ft feet 2.0-3.01122.2 Cross Slope (PAR)SF191125.8to $120 $2,2681544335ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 749 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side S SOTO ST Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151510 Run ID E 26Th St 80.75 ID Sidewalk Width Priority feet 3.0-4.01127.9 Cross Slope (PAR)SF271133.1to $120 $3,2761544345ft feet 2.0-3.01133.4 Cross Slope (PAR)SF151136.3to $120 $1,8271544355ft feet 3.0-4.01138.9 Cross Slope (PAR)SF561149.6to $120 $6,7411544365ft feet 5.0-6.01147.6 Running Slope REF91149.3to166515 5 ft $372,681.75TOTAL COST FOR:E 26TH STSside of Starting at:S SOTO ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 750 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151423 Run ID E 26Th St 79 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF102.4to $120 $1,1521546704ft feet 2.0-3.03.1 Cross Slope (PAR)SF5416.6to $120 $6,4801546714ft feet 2.0-3.018.8 Cross Slope (PAR)SF6234.3to $120 $7,4401546724ft feet 2.0-3.038.2 Cross Slope (PAR)SF1140.9to $120 $1,2961546734ft feet 2.0-3.043.4 Cross Slope (PAR)SF6258.9to $120 $7,4401546744ft feet 2.0-3.079.8 Cross Slope (PAR)SF1683.7to $120 $1,8721546754ft feet 2.0-3.094.0 Cross Slope (PAR)SF41104.3to $120 $4,9441546764ft feet111.9 Cold Patch 15115.7to140511 4 ft feet 4.0-5.0122.6 Cross Slope (PAR)SF10125.1to $120 $1,2001546774ft feet 4.0-5.0128.9 Cross Slope (PAR)SF39138.7to $120 $4,7041546784ft feet134.3 Continuous Width SF4135.3to $120 $4801670844ft feet .27136.0 Vertical Change LF4137.0to $75 $3001375314ft feet -.3139.5 Vertical Change LF4140.5to $75 $3001375324ft feet140.7 Cold Patch 5142.0to140512 4 ft feet140.7 Cold Patch 665306.9to140513 4 ft feet142.1 Continuous Width SF4143.1to $120 $4801673824ft feet 2.0-3.0143.8 Cross Slope (PAR)SF28150.8to $120 $3,3601546794ft feet 4.0-5.0152.7 Cross Slope (PAR)SF14156.3to $120 $1,7281546804ft feet 2.0-3.0156.7 Cross Slope (PAR)SF4157.8to $120 $5281546814ft feet 2.0-3.0163.7 Cross Slope (PAR)SF33172.0to $120 $3,9841546824ft feet 3.0-4.0174.9 Cross Slope (PAR)SF10177.4to $120 $1,2001546834ft feet 2.15177.9 Vertical Change SF4178.9to $75 $3001375334ft feet 3.0-4.0180.3 Cross Slope (PAR)SF28187.3to $120 $3,3601546844ft feet 2.0-3.0188.3 Cross Slope (PAR)SF5189.6to $120 $6241546854ft feet 3.0-4.0191.9 Cross Slope (PAR)SF8193.8to $120 $9121546864ft feet 3.0-4.0196.0 Cross Slope (PAR)SF15199.8to $120 $1,8241546874ft feet 5.0-6.0204.9 Cross Slope (PAR)SF5206.2to $120 $6241546884ft feet -.39209.7 Vertical Change LF4210.7to $75 $3001375344ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 751 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151423 Run ID E 26Th St 79 ID Sidewalk Width Priority feet 3.0-4.0212.8 Cross Slope (PAR)SF14216.4to $120 $1,7281546894ft feet 5.0-6.0216.4 Cross Slope (PAR)SF4217.5to $120 $5281546904ft feet 6.0-7.0217.5 Cross Slope (PAR)SF17221.8to $120 $2,0641546914ft feet .29217.9 Vertical Change REF4218.9to137535 4 ft feet 5.0-6.0222.8 Cross Slope (PAR)SF4223.8to $120 $4801546924ft feet 6.0-7.0224.0 Cross Slope (PAR)SF19228.7to $120 $2,2561546934ft feet 5.0-6.0232.4 Cross Slope (PAR)SF4233.5to $120 $5281546944ft feet 5.0-6.0237.7 Cross Slope (PAR)SF18242.3to $120 $2,2081546954ft feet 4.0-5.0244.6 Cross Slope (PAR)SF49256.8to $120 $5,8561546964ft feet245.4 Continuous Width SF4246.4to $120 $4801674274ft feet -.37249.4 Vertical Change REF4250.4to137536 4 ft feet 3.0-4.0260.2 Cross Slope (PAR)SF28267.3to $120 $3,4081546974ft feet 4.0-5.0270.3 Cross Slope (PAR)SF16274.4to $120 $1,9681546984ft feet 3.0-4.0278.5 Cross Slope (PAR)SF10280.9to $120 $1,1521546994ft feet280.1 Continuous Width SF4281.1to $120 $4801669334ft feet 4.0-5.0285.3 Cross Slope (PAR)SF4286.4to $120 $5281547004ft feet 3.0-4.0290.0 Cross Slope (PAR)SF4291.0to $120 $4801547014ft $80,976.00TOTAL COST FOR:E 26TH STNEside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 752 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name HARRIET ST End Street Name 1911211543 Run ID E 26Th St 71.25 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF71.5to $120 $8551417045ft feet35.3 Continuous Width REF536.3to166867 5 ft feet 2.0-3.044.3 Cross Slope (PAR)SF1246.9to $120 $1,4821417055ft feet 3.0-4.049.2 Cross Slope (PAR)SF1051.2to $120 $1,1401417065ft feet 2.0-3.058.7 Cross Slope (PAR)SF1261.3to $120 $1,4821417075ft feet 3.0-4.063.8 Cross Slope (PAR)SF665.1to $120 $7411417085ft feet 2.0-3.065.4 Cross Slope (PAR)SF566.4to $120 $5701417095ft feet .9265.7 Vertical Change REF566.7to133447 5 ft feet 2.0-3.084.2 Cross Slope (PAR)SF112107.8to $120 $13,4521417105ft feet 4.0-5.0107.8 Cross Slope (PAR)SF19111.8to $120 $2,2801417115ft feet 2.0-3.0111.8 Cross Slope (PAR)SF19115.8to $120 $2,2801417125ft feet 4.0-5.0115.8 Cross Slope (PAR)SF39124.0to $120 $4,6741417135ft feet 2.0-3.0124.0 Cross Slope (PAR)SF44133.2to $120 $5,2441417145ft feet 2129.2 Vertical Change REF5130.2to133448 5 ft feet 4.0-5.0135.8 Cross Slope (PAR)SF109158.8to $120 $13,1101417155ft feet 2.0-3.0159.2 Cross Slope (PAR)SF83176.6to $120 $9,9181417165ft feet 3.19162.5 Vertical Change REF5163.5to133449 5 ft feet 3.05168.6 Vertical Change REF5169.6to133450 5 ft feet 4.0-5.0179.6 Cross Slope (PAR)SF10181.8to $120 $1,2541417175ft feet 2.0-3.0182.7 Cross Slope (PAR)SF101204.0to $120 $12,1411417185ft feet 2.0-3.0206.1 Cross Slope (PAR)SF65219.8to $120 $7,8091417195ft feet 4.0-5.0220.5 Cross Slope (PAR)SF78237.0to $120 $9,4051417205ft feet 2.0-3.0237.0 Cross Slope (PAR)SF23241.9to $120 $2,7931417215ft feet 4.0-5.0241.9 Cross Slope (PAR)SF29248.1to $120 $3,5341417225ft feet248.1 Driveway279.8to164560 feet 2.0-3.0281.3 Cross Slope (PAR)SF18285.1to $120 $2,1661417235ft feet 2.0-3.0288.8 Cross Slope (PAR)SF39297.1to $120 $4,7311417245ft feet 2.0-3.0299.7 Cross Slope (PAR)SF19303.7to $120 $2,2801417255ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 753 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name HARRIET ST End Street Name 1911211543 Run ID E 26Th St 71.25 ID Sidewalk Width Priority feet 2.0-3.0308.3 Cross Slope (PAR)SF64321.8to $120 $7,6951417265ft feet 4.0-5.0321.8 Cross Slope (PAR)SF31328.4to $120 $3,7621417275ft feet -.33328.0 Vertical Change REF5329.0to133452 5 ft feet 2.0-3.0328.7 Cross Slope (PAR)SF41337.3to $120 $4,9021417285ft feet 2.0-3.0339.9 Cross Slope (PAR)SF184378.7to $120 $22,1161417295ft feet .78361.5 Vertical Change REF5362.5to133453 5 ft feet 2.0-3.0382.6 Cross Slope (PAR)SF167417.7to $120 $20,0071417305ft feet .28397.4 Vertical Change REF5398.4to133454 5 ft feet 2.0-3.0433.7 Cross Slope (PAR)SF45443.2to $120 $5,4151417315ft feet .76445.3 Vertical Change REF5446.3to133455 5 ft feet 3.0-4.0446.0 Cross Slope (PAR)SF9447.8to $120 $1,0261417325ft feet 3.0-4.0451.5 Cross Slope (PAR)SF24456.6to $120 $2,9071417335ft feet 2.0-3.0456.6 Cross Slope (PAR)SF5457.7to $120 $6271417345ft feet 2.0-3.0465.1 Cross Slope (PAR)SF114489.0to $120 $13,6231417355ft feet .88480.3 Vertical Change REF5481.3to133456 5 ft feet 2.0-3.0493.8 Cross Slope (PAR)SF9495.6to $120 $1,0261417365ft feet 3.0-4.0498.3 Cross Slope (PAR)SF7499.7to $120 $7981417375ft feet 5.0-6.0500.0 Running Slope SF14503.0to $120 $1,7101664195ft feet 14.0-15.0504.2 Cross Slope (PAR)SF33511.2to $120 $3,9901417385ft feet511.5 Driveway529.0to164561 feet511.5 Driveway539.2to164562 feet 3.21530.0 Vertical Change REF5531.0to133457 5 ft feet 4.0-5.0531.2 Cross Slope (Driveway)SF17534.8to $40 $6841417395ft feet 2.0-3.0535.7 Cross Slope (Driveway)SF17539.2to $40 $6651417405ft $194,294.00TOTAL COST FOR:E 26TH STSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 754 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3770 E 26TH ST End Street Name 2001161539 Run ID E 26Th St 65.25 ID Sidewalk Width Priority feet 3.0-4.00.5 Cross Slope (PAR)SF172.7to $120 $1,9801563918ft feet 4.0-5.07.3 Cross Slope (PAR)SF149.1to $120 $1,6201563928ft feet 2.0-3.023.8 Cross Slope (PAR)SF2126.6to $120 $2,5201563938ft feet 4.0-5.029.3 Cross Slope (PAR)SF2732.9to $120 $3,2401563948ft feet 2.0-3.033.1 Cross Slope (PAR)SF1134.5to $120 $1,2601563958ft feet 7.0-8.034.7 Running Slope SF1536.7to $120 $1,8001665558ft feet 3.0-4.039.4 Cross Slope (PAR)SF2242.3to $120 $2,6101563968ft feet 2.0-3.044.6 Cross Slope (PAR)SF2047.2to $120 $2,3401563978ft feet 4.0-5.048.5 Cross Slope (PAR)SF2952.3to $120 $3,4201563988ft feet 2.0-3.052.5 Cross Slope (PAR)SF4057.8to $120 $4,7701563998ft feet 4.0-5.058.3 Cross Slope (PAR)SF6266.6to $120 $7,4701564008ft feet 2.0-3.066.9 Cross Slope (PAR)SF1568.9to $120 $1,8001564018ft feet 2.0-3.075.7 Cross Slope (PAR)SF876.8to $120 $9901564028ft feet 4.0-5.078.2 Cross Slope (PAR)SF5986.1to $120 $7,1101564038ft feet 2.0-3.088.4 Cross Slope (PAR)SF1390.1to $120 $1,5301564048ft feet 2.0-3.097.6 Cross Slope (PAR)SF29101.5to $120 $3,5101564058ft feet 3.0-4.0104.0 Cross Slope (PAR)SF13105.7to $120 $1,5301564068ft feet 5.0-6.0104.2 Running Slope REF11105.6to166556 8 ft feet 2.0-3.0105.7 Cross Slope (PAR)SF33110.1to $120 $3,9601564078ft feet107.9 Continuous Width REF8108.9to167809 8 ft feet 2.0-3.0113.3 Cross Slope (PAR)SF20115.9to $120 $2,3401564088ft feet 2.0-3.0119.3 Cross Slope (PAR)SF70128.7to $120 $8,4601564098ft feet 3.0-4.0134.8 Cross Slope (PAR)SF15136.8to $120 $1,8001564108ft feet 4.0-5.0142.8 Cross Slope (PAR)SF30146.8to $120 $3,6001564118ft feet 2.0-3.0147.6 Cross Slope (PAR)SF59155.5to $120 $7,1101564128ft feet 4.0-5.0155.5 Cross Slope (PAR)SF9156.7to $120 $1,0801564138ft feet 3.0-4.0161.6 Cross Slope (PAR)SF47167.8to $120 $5,5801564148ft feet 4.0-5.0171.6 Cross Slope (PAR)SF50178.3to $120 $6,0301564158ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 755 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3770 E 26TH ST End Street Name 2001161539 Run ID E 26Th St 65.25 ID Sidewalk Width Priority feet 3.0-4.0180.4 Cross Slope (PAR)SF18182.8to $120 $2,1601564168ft feet 3.0-4.0186.0 Cross Slope (PAR)SF15188.0to $120 $1,8001564178ft feet 4.0-5.0191.6 Cross Slope (PAR)SF75201.6to $120 $9,0001564188ft feet 2.0-3.0201.6 Cross Slope (PAR)SF61209.7to $120 $7,2901564198ft feet 4.0-5.0213.2 Cross Slope (PAR)SF37218.1to $120 $4,4101564208ft feet 4.0-5.0220.7 Cross Slope (PAR)SF23223.8to $120 $2,7901564218ft feet 2.0-3.0224.3 Cross Slope (PAR)SF20227.0to $120 $2,4301564228ft feet 3.0-4.0233.2 Cross Slope (PAR)SF167255.5to $120 $20,0701564238ft feet -.4255.0 Vertical Change REF8256.0to137857 8 ft feet 3.0-4.0257.8 Cross Slope (PAR)SF204285.0to $120 $24,4801564248ft feet 3.0-4.0288.6 Cross Slope (PAR)SF120304.6to $120 $14,4001564258ft feet 4.0-5.0307.7 Cross Slope (PAR)SF43313.4to $120 $5,1301564268ft feet 2.0-3.0313.7 Cross Slope (PAR)SF44319.6to $120 $5,3101564278ft feet 3.0-4.0322.3 Cross Slope (PAR)SF11323.8to $120 $1,3501564288ft feet 2.0-3.0324.1 Cross Slope (PAR)SF43329.8to $120 $5,1301564298ft feet 4.0-5.0331.3 Cross Slope (PAR)SF9332.5to $120 $1,0801564308ft feet 4.0-5.0335.3 Cross Slope (PAR)SF31339.4to $120 $3,6901564318ft feet 4.0-5.0341.8 Cross Slope (PAR)SF88353.5to $120 $10,5301564328ft feet 2.0-3.0353.5 Cross Slope (PAR)SF29357.4to $120 $3,5101564338ft feet 4.0-5.0359.3 Cross Slope (PAR)SF42364.9to $120 $5,0401564348ft feet 3.0-4.0370.3 Cross Slope (PAR)SF11371.8to $120 $1,3501564358ft feet 5.0-6.0373.4 Cross Slope (PAR)SF29377.2to $120 $3,4201564368ft feet 3.36377.6 Vertical Change SF8378.6to $75 $5631378588ft feet 4.0-5.0379.3 Cross Slope (PAR)SF67388.2to $120 $8,0101564378ft feet 2.0-3.0389.8 Cross Slope (PAR)SF17392.1to $120 $2,0701564388ft feet 4.0-5.0393.6 Cross Slope (PAR)SF60401.6to $120 $7,2001564398ft feet 2.0-3.0401.6 Cross Slope (PAR)SF34406.1to $120 $4,0501564408ft feet406.6 Driveway458.4to165868 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 756 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3770 E 26TH ST End Street Name 2001161539 Run ID E 26Th St 65.25 ID Sidewalk Width Priority feet .26440.8 Vertical Change REF8441.8to137859 8 ft feet 3.0-4.0459.7 Cross Slope (PAR)SF11461.2to $120 $1,3501564418ft feet 2.0-3.0462.4 Cross Slope (PAR)SF32466.7to $120 $3,8701564428ft feet468.2 Driveway495.4to165869 feet -.41486.3 Vertical Change REF8487.3to137860 8 ft feet 3.0-4.0499.3 Cross Slope (PAR)SF124515.8to $120 $14,8501564438ft feet 3.0-4.0522.8 Cross Slope (PAR)SF36527.6to $120 $4,3201564448ft feet 2.0-3.0531.2 Cross Slope (PAR)SF16533.3to $120 $1,8901564458ft feet 4.0-5.0534.8 Cross Slope (PAR)SF32539.1to $120 $3,8701564468ft feet 2.0-3.0540.2 Cross Slope (PAR)SF44546.1to $120 $5,3101564478ft feet .42542.6 Vertical Change REF8543.6to137861 8 ft feet 2.0-3.0548.3 Cross Slope (PAR)SF32552.6to $120 $3,8701564488ft feet 3.0-4.0555.2 Cross Slope (PAR)SF14557.1to $120 $1,7101564498ft feet 2.0-3.0557.1 Cross Slope (PAR)SF43562.8to $120 $5,1301564508ft feet 2.0-3.0569.7 Cross Slope (PAR)SF95582.4to $120 $11,4301564518ft feet 4.0-5.0582.6 Cross Slope (PAR)SF65591.3to $120 $7,8301564528ft feet 2.0-3.0591.3 Cross Slope (PAR)SF53598.3to $120 $6,3001564538ft feet .34599.1 Vertical Change LF8600.1to $75 $5631378628ft feet 2.0-3.0602.4 Cross Slope (PAR)SF143621.4to $120 $17,1001564548ft feet -.34616.3 Vertical Change REF8617.3to137863 8 ft feet 2.0-3.0632.8 Cross Slope (PAR)SF43638.5to $120 $5,1301564558ft feet640.3 Driveway663.9to165870 feet 3.0-4.0671.2 Cross Slope (PAR)SF12672.8to $120 $1,4401564568ft feet 2.0-3.0673.2 Cross Slope (PAR)SF10674.5to $120 $1,1701564578ft feet 3.0-4.0679.3 Cross Slope (PAR)SF12680.9to $120 $1,4401564588ft feet 2.0-3.0680.9 Cross Slope (PAR)SF33685.3to $120 $3,9601564598ft feet685.3 Driveway703.7to165871 feet 3.0-4.0704.9 Cross Slope (PAR)SF62713.2to $120 $7,4701564608ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 757 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3770 E 26TH ST End Street Name 2001161539 Run ID E 26Th St 65.25 ID Sidewalk Width Priority feet 5.0-6.0713.2 Cross Slope (PAR)SF16715.3to $120 $1,8901564618ft feet 6.0-7.0716.0 Cross Slope (PAR)SF10717.3to $120 $1,1701564628ft feet 5.0-6.0717.5 Cross Slope (PAR)SF76727.6to $120 $9,0901564638ft feet 5.0-6.0727.2 Running Slope REF8728.3to166557 8 ft feet 6.0-7.0728.1 Cross Slope (PAR)SF17730.3to $120 $1,9801564648ft feet730.8 Driveway773.8to165872 feet -.27735.2 Vertical Change REF8736.2to137864 8 ft feet -.29773.1 Vertical Change REF8774.1to137865 8 ft feet 2.0-3.0777.0 Cross Slope (PAR)SF74786.9to $120 $8,9101564658ft feet 2.0-3.0790.0 Cross Slope (PAR)SF16792.1to $120 $1,8901564668ft feet 3.0-4.0794.3 Cross Slope (PAR)SF21797.1to $120 $2,5201564678ft feet 2.0-3.0797.1 Cross Slope (PAR)SF275833.8to $120 $33,0301564688ft feet .3803.2 Vertical Change REF8804.2to137866 8 ft feet 4.0-5.0836.2 Cross Slope (PAR)SF21839.0to $120 $2,5201564698ft feet 2.0-3.0839.6 Cross Slope (PAR)SF59847.5to $120 $7,1101564708ft feet 3.0-4.0849.7 Cross Slope (PAR)SF132867.3to $120 $15,8401564718ft feet 5.0-6.0867.3 Cross Slope (PAR)SF42872.9to $120 $5,0401564728ft feet 4.0-5.0875.3 Cross Slope (PAR)SF71884.8to $120 $8,5501564738ft feet 2.0-3.0884.8 Cross Slope (PAR)SF19887.3to $120 $2,2501564748ft feet 4.0-5.0888.2 Cross Slope (PAR)SF8889.2to $120 $9001564758ft feet889.6 Driveway940.1to165873 feet 2.0-3.0942.0 Cross Slope (PAR)SF38947.0to $120 $4,5001564768ft feet 3.0-4.0950.4 Cross Slope (PAR)SF76960.5to $120 $9,0901564778ft feet 2.0-3.0968.1 Cross Slope (PAR)SF31972.2to $120 $3,6901564788ft feet 2.0-3.0974.3 Cross Slope (PAR)SF23977.4to $120 $2,7901564798ft feet 3.0-4.0986.0 Cross Slope (PAR)SF18988.4to $120 $2,1601564808ft feet990.2 Driveway1018.6to165874 feet 3.0-4.01019.3 Cross Slope (Driveway)SF1501039.3to $40 $6,0001564818ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 758 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name 3770 E 26TH ST End Street Name 2001161539 Run ID E 26Th St 65.25 ID Sidewalk Width Priority feet .551027.0 Vertical Change REF81028.0to137868 8 ft feet -.391042.8 Vertical Change LF81043.8to $75 $5631378698ft feet1042.8 Driveway1071.5to165875 feet1042.8 Driveway1093.2to165876 feet -.261070.3 Vertical Change REF81071.3to137870 8 ft feet 2.0-3.01072.8 Cross Slope (Driveway)SF411078.2to $40 $1,6201564828ft feet 3.0-4.01081.7 Cross Slope (Driveway)SF461087.8to $40 $1,8301564838ft feet 2.0-3.01087.8 Cross Slope (Driveway)SF341092.3to $40 $1,3501564848ft feet 5.0-6.01091.4 Running Slope REF81092.4to166558 8 ft $492,007.50TOTAL COST FOR:E 26TH STSside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 759 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIERRA PINE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151330 Run ID E 26Th St 88.25 ID Sidewalk Width Priority feet .60.3 Vertical Change REF51.3to137561 5 ft feet 3.0-4.00.5 Cross Slope (PAR)SF235.0to $120 $2,7001548515ft feet5.6 Continuous Width SF56.6to $120 $6001676595ft feet 2.0-3.06.0 Cross Slope (PAR)SF2511.0to $120 $3,0001548525ft feet 2.0-3.014.7 Cross Slope (PAR)SF8932.4to $120 $10,6201548535ft feet .9727.5 Vertical Change REF528.5to137562 5 ft feet .2631.7 Vertical Change REF532.7to137563 5 ft feet 4.0-5.032.4 Cross Slope (PAR)SF833.9to $120 $9001548545ft feet 3.0-4.036.3 Cross Slope (PAR)SF3543.2to $120 $4,1401548555ft feet 1.3441.8 Vertical Change REF542.8to137564 5 ft feet 3.0-4.046.0 Cross Slope (PAR)SF1148.1to $120 $1,2601548565ft feet 2.0-3.049.0 Cross Slope (PAR)SF12072.9to $120 $14,3401548575ft feet56.7 Continuous Width REF557.7to167233 5 ft feet .4261.4 Vertical Change REF562.4to137565 5 ft feet73.6 Cold Patch 6085.5to140524 5 ft feet 1.6579.8 Vertical Change SF580.8to $75 $3751375665ft feet 2.0-3.087.9 Cross Slope (PAR)SF3995.7to $120 $4,6801548585ft feet 3.295.5 Vertical Change REF596.5to137567 5 ft feet96.5 Continuous Width REF597.5to167709 5 ft feet 2.0-3.0101.1 Cross Slope (PAR)SF5102.1to $120 $6001548595ft feet 2.02101.6 Vertical Change REF5102.6to137568 5 ft feet 4.0-5.0103.0 Cross Slope (PAR)SF20107.0to $120 $2,4001548605ft feet 2.0-3.0108.8 Cross Slope (PAR)SF9110.5to $120 $1,0201548615ft feet 4.0-5.0112.8 Cross Slope (PAR)SF6113.9to $120 $6601548625ft feet 2.0-3.0116.4 Cross Slope (PAR)SF42124.8to $120 $5,0401548635ft feet 4.0-5.0125.1 Cross Slope (PAR)SF20129.1to $120 $2,4001548645ft feet 3.0-4.0132.8 Cross Slope (PAR)SF8134.3to $120 $9001548655ft feet 2.0-3.0135.0 Cross Slope (PAR)SF33141.5to $120 $3,9001548665ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 760 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIERRA PINE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151330 Run ID E 26Th St 88.25 ID Sidewalk Width Priority feet 4.0-5.0141.5 Cross Slope (PAR)SF16144.7to $120 $1,9201548675ft feet 6.0-7.0144.7 Cross Slope (PAR)SF5145.7to $120 $6001548685ft feet 5.0-6.0145.7 Cross Slope (PAR)SF61157.8to $120 $7,2601548695ft feet 3.0-4.0158.8 Cross Slope (PAR)SF11161.1to $120 $1,3801548705ft feet 2.0-3.0161.8 Cross Slope (PAR)SF15164.8to $120 $1,8001548715ft feet 3.0-4.0166.9 Cross Slope (PAR)SF61179.1to $120 $7,3201548725ft feet 5.0-6.0179.3 Cross Slope (PAR)SF8180.8to $120 $9001548735ft feet 3.0-4.0184.5 Cross Slope (PAR)SF7185.8to $120 $7801548745ft feet 2.0-3.0185.8 Cross Slope (PAR)SF32192.1to $120 $3,7801548755ft feet 4.0-5.0192.6 Cross Slope (PAR)SF56203.8to $120 $6,7201548765ft feet 1.29193.4 Vertical Change REF5194.4to137569 5 ft feet 2.0-3.0208.4 Cross Slope (PAR)SF11210.5to $120 $1,2601548775ft feet 5.0-6.0210.6 Running Slope SF6211.7to $120 $6601665225ft feet213.7 Continuous Width SF5214.7to $120 $6001676605ft feet .54216.8 Vertical Change SF5217.8to $75 $3751375705ft feet217.3 Driveway240.7to165775 feet 2.0-3.0240.7 Cross Slope (Driveway)SF24245.5to $40 $9601548785ft feet 5.0-6.0265.9 Cross Slope (PAR)SF12268.2to $120 $1,3801548795ft feet268.7 Driveway303.6to165776 feet268.7 Driveway491.4to165777 feet .28291.2 Vertical Change REF5292.2to137571 5 ft feet .31294.6 Vertical Change REF5295.6to137572 5 ft feet 5.0-6.0306.3 Cross Slope (Driveway)SF26311.5to $40 $1,0401548805ft feet 5.0-6.0316.8 Cross Slope (Driveway)SF5317.9to $40 $2201548815ft feet 6.0-7.0317.9 Cross Slope (Driveway)SF6319.0to $40 $2201548825ft feet 4.0-5.0320.1 Cross Slope (Driveway)SF6321.4to $40 $2601548835ft feet 3.0-4.0325.1 Cross Slope (Driveway)SF52335.6to $40 $2,1001548845ft feet 4.0-5.0337.8 Cross Slope (Driveway)SF22342.1to $40 $8601548855ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 761 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side SIERRA PINE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151330 Run ID E 26Th St 88.25 ID Sidewalk Width Priority feet 6.0-7.0342.1 Cross Slope (Driveway)SF12344.4to $40 $4601548865ft feet 5.0-6.0344.4 Cross Slope (Driveway)SF22348.7to $40 $8601548875ft feet .27345.6 Vertical Change REF5346.6to137573 5 ft feet 5.0-6.0351.5 Cross Slope (Driveway)SF24356.3to $40 $9601548885ft feet 3.0-4.0356.9 Cross Slope (Driveway)SF14359.6to $40 $5401548895ft feet 2.0-3.0359.6 Cross Slope (Driveway)SF49369.3to $40 $1,9401548905ft feet 3.0-4.0373.5 Cross Slope (Driveway)SF6374.7to $40 $2401548915ft feet 2.0-3.0375.3 Cross Slope (Driveway)SF76390.5to $40 $3,0401548925ft feet 4.0-5.0390.5 Cross Slope (Driveway)SF49400.3to $40 $1,9601548935ft feet 2.0-3.0407.0 Cross Slope (Driveway)SF225451.9to $40 $8,9801548945ft feet 2.0-3.0455.8 Cross Slope (Driveway)SF18459.3to $40 $7001548955ft feet 3.0-4.0462.0 Cross Slope (Driveway)SF21466.2to $40 $8401548965ft feet 4.0-5.0468.6 Cross Slope (Driveway)SF49478.3to $40 $1,9401548975ft feet 2.0-3.0478.4 Cross Slope (Driveway)SF25483.3to $40 $9801548985ft feet 2.0-3.0486.3 Cross Slope (Driveway)SF26491.4to $40 $1,0201548995ft feet 6.0-7.0489.5 Running Slope REF10491.4to166523 5 ft $126,390.00TOTAL COST FOR:E 26TH STSside of Starting at:SIERRA PINE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 762 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911211621 Run ID E 26Th St 32 ID Sidewalk Width Priority feet 2.0-3.07.0 Cross Slope (PAR)SF5013.6to $120 $5,9401415838ft feet 4.0-5.014.4 Cross Slope (PAR)SF3318.8to $120 $3,9601415848ft feet18.8 Driveway43.6to164550 feet 2.0-3.044.3 Cross Slope (Driveway)SF9056.3to $40 $3,6001415858ft feet 4.0-5.060.2 Cross Slope (PAR)SF1762.5to $120 $2,0701415868ft feet 2.0-3.062.9 Cross Slope (PAR)SF10877.3to $120 $12,9601415878ft feet77.8 Driveway100.8to164551 feet 2.0-3.0103.9 Cross Slope (PAR)SF180127.9to $120 $21,6001415888ft $50,130.00TOTAL COST FOR:E 26TH STNside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 763 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151430 Run ID E 26Th St 74.25 ID Sidewalk Width Priority feet 2.0-3.010.9 Cross Slope (PAR)SF1313.3to $120 $1,5121546365ft feet 4.0-5.013.3 Cross Slope (PAR)SF3319.5to $120 $3,9061546375ft feet 2.0-3.020.3 Cross Slope (PAR)SF9638.6to $120 $11,5291546385ft feet 4.0-5.038.6 Cross Slope (PAR)SF6450.7to $120 $7,6231546395ft feet 2.0-3.053.0 Cross Slope (PAR)SF954.7to $120 $1,0711546405ft feet 4.0-5.055.6 Cross Slope (PAR)SF1859.0to $120 $2,1421546415ft feet 3.0-4.061.4 Cross Slope (PAR)SF2967.0to $120 $3,5281546425ft feet67.5 Continuous Width REF568.5to167204 5 ft feet 5.0-6.068.6 Cross Slope (PAR)SF1872.0to $120 $2,1421546435ft feet 3.0-4.072.0 Cross Slope (PAR)SF8287.7to $120 $9,8911546445ft feet 2.0-3.087.7 Cross Slope (PAR)SF1289.9to $120 $1,3861546455ft feet90.7 Driveway107.3to165758 feet -.3491.5 Vertical Change REF592.5to137521 5 ft feet 2.0-3.0107.5 Cross Slope (PAR)SF27112.7to $120 $3,2761546465ft feet 3.0-4.0119.4 Cross Slope (PAR)SF14122.1to $120 $1,7011546475ft feet .59124.3 Vertical Change SF5125.3to $75 $3941375225ft feet 3.0-4.0126.4 Cross Slope (PAR)SF35133.0to $120 $4,1581546485ft feet133.0 Driveway149.2to165759 feet 2.0-3.0152.8 Cross Slope (PAR)SF23157.1to $120 $2,7091546495ft feet -.28161.0 Vertical Change LF5162.0to $75 $3941375235ft feet 5.0-6.0169.8 Cross Slope (PAR)SF9171.6to $120 $1,1341546505ft feet172.3 Driveway187.6to165760 feet202.2 Driveway226.1to165761 feet .32214.3 Vertical Change REF5215.3to137524 5 ft feet 5.0-6.0228.4 Cross Slope (PAR)SF7229.8to $120 $8821546515ft feet 5.0-6.0232.7 Cross Slope (PAR)SF28238.0to $120 $3,3391546525ft feet 3.0-4.0241.9 Cross Slope (PAR)SF7243.2to $120 $8191546535ft feet 3.0-4.0245.8 Cross Slope (PAR)SF26250.8to $120 $3,1501546545ft feet .38248.1 Vertical Change REF5249.1to137525 5 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 764 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151430 Run ID E 26Th St 74.25 ID Sidewalk Width Priority feet 5.0-6.0255.4 Cross Slope (PAR)SF7256.8to $120 $8821546555ft feet 3.0-4.0258.7 Cross Slope (PAR)SF24263.3to $120 $2,8981546565ft feet .31261.4 Vertical Change REF5262.4to137526 5 ft feet 3.0-4.0266.1 Cross Slope (PAR)SF27271.3to $120 $3,2761546575ft feet 2.0-3.0283.7 Cross Slope (PAR)SF5284.7to $120 $6301546585ft feet 2.0-3.0289.5 Cross Slope (PAR)SF102308.9to $120 $12,2221546595ft feet 1.01311.2 Vertical Change REF5312.2to137527 5 ft feet 3.0-4.0311.4 Cross Slope (PAR)SF25316.2to $120 $3,0241546605ft feet314.4 Continuous Width SF5315.4to $120 $6301671375ft feet 2.0-3.0316.8 Cross Slope (PAR)SF64328.9to $120 $7,6231546615ft feet 2.0-3.0333.0 Cross Slope (PAR)SF36339.8to $120 $4,2841546625ft feet 4.0-5.0343.7 Cross Slope (PAR)SF121366.8to $120 $14,5531546635ft feet 2.0-3.0369.4 Cross Slope (PAR)SF7370.7to $120 $8191546645ft feet 2.0-3.0373.1 Cross Slope (PAR)SF10375.0to $120 $1,1971546655ft feet378.1 Driveway405.1to165762 feet .33393.9 Vertical Change REF5394.9to137528 5 ft feet .27421.4 Vertical Change LF5422.4to $75 $3941375295ft feet433.6 Continuous Width REF5434.6to167728 5 ft feet 2.0-3.0433.9 Cross Slope (PAR)SF28439.2to $120 $3,3391546665ft feet 4.0-5.0441.7 Cross Slope (PAR)SF6442.8to $120 $6931546675ft feet444.2 Driveway468.7to165763 feet .29471.1 Vertical Change REF5472.1to137530 5 ft feet 3.0-4.0471.5 Cross Slope (PAR)SF7472.8to $120 $8191546685ft feet 2.0-3.0472.8 Cross Slope (PAR)SF23477.2to $120 $2,7721546695ft feet 5.0-6.0475.6 Running Slope REF7476.9to166519 5 ft $126,740.25TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 765 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING (3305 E 26TH ST) End Street Name 2001151440 Run ID E 26Th St 98.25 ID Sidewalk Width Priority feet0.6 Driveway13.8to165752 feet 4.0-5.013.8 Cross Slope (Driveway)SF1115.9to $40 $4411545775ft feet 2.0-3.016.2 Cross Slope (PAR)SF3422.6to $120 $4,0321545785ft feet 2.0819.2 Vertical Change REF520.2to137486 5 ft feet 4.0-5.023.4 Cross Slope (PAR)SF4031.1to $120 $4,8511545795ft feet -.3830.0 Vertical Change REF531.0to137487 5 ft feet .2833.3 Vertical Change LF534.3to $75 $3941374885ft feet 2.0-3.034.8 Cross Slope (PAR)SF1637.8to $120 $1,8901545805ft feet 3.0-4.041.2 Cross Slope (PAR)SF742.5to $120 $8191545815ft feet 4.0-5.046.5 Cross Slope (PAR)SF3352.7to $120 $3,9061545825ft feet -.3549.7 Vertical Change REF550.7to137489 5 ft feet 2.0-3.053.8 Cross Slope (PAR)SF9872.4to $120 $11,7181545835ft feet .3169.2 Vertical Change REF570.2to137490 5 ft feet 2.0-3.076.1 Cross Slope (PAR)SF1579.0to $120 $1,8271545845ft feet -.3277.4 Vertical Change REF578.4to137491 5 ft feet 4.0-5.079.9 Cross Slope (PAR)SF2183.9to $120 $2,5201545855ft feet 2.0-3.084.4 Cross Slope (PAR)SF2088.3to $120 $2,4571545865ft feet 2.0-3.091.5 Cross Slope (PAR)SF792.8to $120 $8191545875ft feet 2.0-3.096.3 Cross Slope (PAR)SF1599.1to $120 $1,7641545885ft feet101.1 Driveway130.9to165753 feet .26101.3 Vertical Change REF5102.3to137492 5 ft feet -.26112.8 Vertical Change REF5113.8to137493 5 ft feet 2.0-3.0136.5 Cross Slope (PAR)SF7137.8to $120 $8191545895ft feet 2.0-3.0147.1 Cross Slope (PAR)SF13149.5to $120 $1,5121545905ft feet 3.0-4.0152.2 Cross Slope (PAR)SF15155.1to $120 $1,8271545915ft feet 3.0-4.0166.8 Cross Slope (PAR)SF5167.8to $120 $6301545925ft feet 2.0-3.0172.3 Cross Slope (PAR)SF20176.1to $120 $2,3941545935ft feet .29190.5 Vertical Change LF5191.5to $75 $3941374945ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 766 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING (3305 E 26TH ST) End Street Name 2001151440 Run ID E 26Th St 98.25 ID Sidewalk Width Priority feet 3.0-4.0197.1 Cross Slope (PAR)SF19200.8to $120 $2,3311545945ft feet 2.0-3.0202.3 Cross Slope (PAR)SF9204.1to $120 $1,1341545955ft feet 3.0-4.0206.3 Cross Slope (PAR)SF72220.1to $120 $8,6941545965ft feet 1.4215.4 Vertical Change REF5216.4to137495 5 ft feet226.8 Driveway349.3to165754 feet -.31256.9 Vertical Change REF5257.9to137497 5 ft feet .26304.7 Vertical Change REF5305.7to137498 5 ft feet -.27346.3 Vertical Change REF5347.3to137499 5 ft feet 2.0-3.0350.0 Cross Slope (PAR)SF15352.9to $120 $1,8271545975ft feet 3.0-4.0357.9 Cross Slope (PAR)SF6359.1to $120 $7561545985ft feet 2.0-3.0362.8 Cross Slope (PAR)SF5363.8to $120 $6301545995ft feet 4.0-5.0366.0 Cross Slope (PAR)SF17369.3to $120 $2,0791546005ft feet .31373.7 Vertical Change LF5374.7to $75 $3941375005ft feet373.9 Cold Patch 76388.3to140510 5 ft feet 1.26375.6 Vertical Change SF5376.6to $75 $3941375015ft feet .5386.7 Vertical Change SF5387.7to $75 $3941375025ft feet 5.0-6.0390.1 Running Slope SF6391.2to $120 $6931665185ft feet 2.0-3.0393.0 Cross Slope (PAR)SF84409.0to $120 $10,0801546015ft feet 2.0-3.0418.2 Cross Slope (PAR)SF22422.4to $120 $2,6461546025ft feet .31425.8 Vertical Change LF5426.8to $75 $3941375035ft feet -.59427.7 Vertical Change SF5428.7to $75 $3941375045ft feet 3.0-4.0432.9 Cross Slope (PAR)SF15435.7to $120 $1,7641546035ft feet 2.0-3.0435.7 Cross Slope (PAR)SF50445.2to $120 $5,9851546045ft feet 2.0-3.0447.3 Cross Slope (PAR)SF38454.5to $120 $4,5361546055ft feet 4.0-5.0456.4 Cross Slope (PAR)SF41464.2to $120 $4,9141546065ft feet464.2 Driveway500.1to165755 feet .35473.5 Vertical Change REF5474.5to137505 5 ft feet 4.0-5.0500.1 Cross Slope (Driveway)SF14502.7to $40 $5461546075ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 767 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING (3305 E 26TH ST) End Street Name 2001151440 Run ID E 26Th St 98.25 ID Sidewalk Width Priority feet 1.53502.4 Vertical Change REF5503.4to137506 5 ft feet 4.0-5.0505.2 Cross Slope (PAR)SF61516.9to $120 $7,3711546085ft feet 4.0-5.0519.1 Cross Slope (PAR)SF6520.2to $120 $6931546095ft feet 4.0-5.0523.3 Cross Slope (PAR)SF80538.6to $120 $9,6391546105ft feet 3.0-4.0541.8 Cross Slope (PAR)SF15544.7to $120 $1,8271546115ft feet 5.0-6.0544.9 Cross Slope (PAR)SF8546.4to $120 $9451546125ft feet 5.0-6.0553.8 Cross Slope (PAR)SF6555.0to $120 $7561546135ft feet 3.0-4.0556.1 Cross Slope (PAR)SF13558.5to $120 $1,5121546145ft feet 2.0-3.0558.5 Cross Slope (PAR)SF28563.9to $120 $3,4021546155ft feet .62559.3 Vertical Change REF5560.3to137507 5 ft feet .89561.8 Vertical Change REF5562.8to137508 5 ft feet 4.0-5.0564.7 Cross Slope (PAR)SF80579.9to $120 $9,5761546165ft feet 2.46566.7 Vertical Change REF5567.7to137509 5 ft feet 5.0-6.0582.7 Cross Slope (PAR)SF16585.8to $120 $1,9531546175ft feet 2.74592.9 Vertical Change SF5593.9to $75 $3941375105ft feet 5.0-6.0598.4 Cross Slope (PAR)SF6599.5to $120 $6931546185ft feet 2.0-3.0601.3 Cross Slope (PAR)SF5602.3to $120 $6301546195ft feet 4.0-5.0603.4 Cross Slope (PAR)SF6604.5to $120 $6931546205ft feet .8608.0 Vertical Change SF5609.0to $75 $3941375115ft feet 4.0-5.0609.1 Cross Slope (PAR)SF56619.8to $120 $6,7411546215ft feet .3618.6 Vertical Change REF5619.6to137512 5 ft feet 3.0-4.0625.8 Cross Slope (PAR)SF5626.8to $120 $6301546225ft feet 3.0-4.0631.1 Cross Slope (PAR)SF22635.3to $120 $2,6461546235ft feet 2.0-3.0635.3 Cross Slope (PAR)SF24639.9to $120 $2,8981546245ft feet 4.14635.5 Vertical Change REF5636.5to137513 5 ft feet641.7 Driveway676.6to165756 feet 2.18679.3 Vertical Change REF5680.3to137514 5 ft feet 3.0-4.0680.3 Cross Slope (PAR)SF11682.4to $120 $1,3231546255ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 768 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING (3305 E 26TH ST) End Street Name 2001151440 Run ID E 26Th St 98.25 ID Sidewalk Width Priority feet -.28682.7 Vertical Change LF5683.7to $75 $3941375155ft feet 3.0-4.0687.9 Cross Slope (PAR)SF13690.3to $120 $1,5121546265ft feet .27692.9 Vertical Change REF5693.9to137516 5 ft feet 2.0-3.0693.3 Cross Slope (PAR)SF8694.8to $120 $9451546275ft feet 4.0-5.0696.8 Cross Slope (PAR)SF88713.6to $120 $10,5841546285ft feet 3.0-4.0715.8 Cross Slope (PAR)SF79730.8to $120 $9,4501546295ft feet 2.0-3.0732.0 Cross Slope (PAR)SF16735.1to $120 $1,9531546305ft feet 4.0-5.0735.1 Cross Slope (PAR)SF75749.3to $120 $8,9461546315ft feet .92749.9 Vertical Change SF5750.9to $75 $3941375175ft feet750.1 Driveway767.4to165757 feet 5.0-6.0767.4 Cross Slope (Driveway)SF27772.6to $40 $1,0921546325ft feet 4.0-5.0779.6 Cross Slope (PAR)SF8781.2to $120 $1,0081546335ft feet 4.0-5.0783.3 Cross Slope (PAR)SF127807.4to $120 $15,1831546345ft feet .57793.2 Vertical Change REF5794.2to137518 5 ft feet -.35811.1 Vertical Change REF5812.1to137519 5 ft feet 13.0-14.0811.4 Cross Slope (PAR)SF124835.1to $120 $14,9311546355ft feet841.5 Driveway870.0to164438 feet .36892.1 Vertical Change LF5893.1to $75 $3941375205ft $217,098.00TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 769 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name MINERVA ST End Street Name 1911211533 Run ID E 26Th St 67 ID Sidewalk Width Priority feet 2.0-3.00.7 Cross Slope (PAR)SF5611.3to $120 $6,6781417415ft feet .542.0 Vertical Change REF53.0to133458 5 ft feet .814.1 Vertical Change REF55.1to133459 5 ft feet .528.9 Vertical Change REF59.9to133460 5 ft feet 4.0-5.014.4 Cross Slope (PAR)SF4523.0to $120 $5,4181417425ft feet .5319.2 Vertical Change REF520.2to133461 5 ft feet -.2923.6 Vertical Change LF524.6to $75 $3941334625ft feet 2.0-3.028.0 Cross Slope (PAR)SF1430.6to $120 $1,6381417435ft feet 2.0-3.035.0 Cross Slope (PAR)SF936.8to $120 $1,1341417445ft feet 2.0-3.042.6 Cross Slope (PAR)SF15972.8to $120 $19,0261417455ft feet 2.0-3.075.5 Cross Slope (PAR)SF977.2to $120 $1,0711417465ft feet77.9 Cold Patch 3183.9to140262 5 ft feet .3681.0 Vertical Change LF582.0to $75 $3941334635ft feet 2.0-3.089.2 Cross Slope (PAR)SF1091.1to $120 $1,1971417475ft feet 2.6391.4 Vertical Change SF592.4to $75 $3941334645ft feet 2.0-3.094.0 Cross Slope (PAR)SF2899.3to $120 $3,3391417485ft feet 2.0-3.0101.8 Cross Slope (PAR)SF65114.2to $120 $7,8121417495ft feet 4.0-5.0114.7 Cross Slope (PAR)SF45123.2to $120 $5,3551417505ft feet 2.0-3.0126.2 Cross Slope (PAR)SF53136.3to $120 $6,3631417515ft feet 1.19129.8 Vertical Change REF5130.8to133465 5 ft feet 2.0-3.0138.8 Cross Slope (PAR)SF15141.7to $120 $1,8271417525ft feet 3.0-4.0154.4 Cross Slope (PAR)SF7155.8to $120 $8821417535ft feet 2.0-3.0164.8 Cross Slope (PAR)SF69177.9to $120 $8,2531417545ft feet177.9 Driveway221.1to164563 feet -.26194.3 Vertical Change REF5195.3to133466 5 ft feet .27211.7 Vertical Change REF5212.7to133467 5 ft feet 4.0-5.0222.0 Cross Slope (PAR)SF53232.0to $120 $6,3001417555ft feet 2.0-3.0232.9 Cross Slope (PAR)SF36239.8to $120 $4,3471417565ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 770 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name MINERVA ST End Street Name 1911211533 Run ID E 26Th St 67 ID Sidewalk Width Priority feet 3.35243.1 Vertical Change REF5244.1to133468 5 ft feet 2.0-3.0243.9 Cross Slope (PAR)SF23248.2to $120 $2,7091417575ft feet -.26246.4 Vertical Change REF5247.4to133469 5 ft feet 3.0-4.0250.3 Cross Slope (PAR)SF23254.7to $120 $2,7721417585ft feet252.4 Continuous Width SF5253.4to $120 $6301671105ft feet 2.0-3.0254.7 Cross Slope (PAR)SF144282.1to $120 $17,2621417595ft feet 3.46259.0 Vertical Change REF5260.0to133470 5 ft feet .31261.0 Vertical Change REF5262.0to133471 5 ft feet .43271.6 Vertical Change REF5272.6to133472 5 ft feet275.6 Continuous Width SF5276.6to $120 $6301670905ft feet282.5 Driveway309.3to164564 feet 2.0-3.0310.8 Cross Slope (PAR)SF16313.8to $120 $1,8901417605ft feet313.8 Driveway378.5to164565 feet 2.0-3.0379.0 Cross Slope (PAR)SF104398.8to $120 $12,4741417615ft feet 2.0-3.0401.5 Cross Slope (PAR)SF30407.2to $120 $3,5911417625ft feet 2.0-3.0411.9 Cross Slope (PAR)SF23416.3to $120 $2,7721417635ft feet 4.0-5.0421.8 Cross Slope (PAR)SF8423.3to $120 $9451417645ft feet 2.0-3.0423.9 Cross Slope (PAR)SF5424.9to $120 $6301417655ft feet 3.0-4.0432.5 Cross Slope (PAR)SF11434.6to $120 $1,3231417665ft feet 2.0-3.0434.6 Cross Slope (PAR)SF19438.3to $120 $2,3311417675ft feet439.3 Driveway455.4to164566 feet 2.88439.9 Vertical Change REF5440.9to133473 5 ft feet .26458.1 Vertical Change LF5459.1to $75 $3941334745ft $132,174.00TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 771 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING BEFORE S DOWNEY RD End Street Name 2001151335 Run ID E 26Th St 55.5 ID Sidewalk Width Priority feet 2.0-3.00.5 Cross Slope (PAR)SF121.7to $120 $1,47615480910ft feet 4.0-5.04.1 Cross Slope (PAR)SF155.6to $120 $1,84515481010ft feet 2.0-3.07.5 Cross Slope (PAR)SF229.6to $120 $2,58315481110ft feet 4.0-5.026.2 Cross Slope (PAR)SF5531.6to $120 $6,64215481210ft feet 3.0-4.034.8 Cross Slope (PAR)SF2136.8to $120 $2,46015481310ft feet 2.0-3.036.9 Cross Slope (PAR)SF1638.5to $120 $1,96815481410ft feet 5.0-6.040.1 Cross Slope (PAR)SF1041.1to $120 $1,23015481510ft feet 6.0-7.041.3 Cross Slope (PAR)SF1042.3to $120 $1,23015481610ft feet 3.0-4.045.3 Cross Slope (PAR)SF3148.3to $120 $3,69015481710ft feet 2.0-3.057.3 Cross Slope (PAR)SF1158.4to $120 $1,35315481810ft feet60.1 Driveway117.8to165770 feet 2.0-3.0135.8 Cross Slope (PAR)SF59141.6to $120 $7,13415481910ft feet 2.0-3.0152.5 Cross Slope (PAR)SF32155.6to $120 $3,81315482010ft feet 2.0-3.0158.3 Cross Slope (PAR)SF23160.5to $120 $2,70615482110ft feet 2.0-3.0170.8 Cross Slope (PAR)SF56176.3to $120 $6,76515482210ft feet 2.0-3.0183.0 Cross Slope (PAR)SF59188.8to $120 $7,13415482310ft feet 2.0-3.0192.7 Cross Slope (PAR)SF68199.3to $120 $8,11815482410ft feet 2.0-3.0204.5 Cross Slope (PAR)SF12205.7to $120 $1,47615482510ft feet 2.0-3.0207.8 Cross Slope (PAR)SF50212.7to $120 $6,02715482610ft feet 2.0-3.0215.8 Cross Slope (PAR)SF15217.3to $120 $1,84515482710ft feet .63218.4 Vertical Change SF10219.4to $75 $76913755410ft feet 2.0-3.0225.8 Cross Slope (PAR)SF16227.4to $120 $1,96815482810ft feet 2.0-3.0230.2 Cross Slope (PAR)SF25232.6to $120 $2,95215482910ft feet240.1 Driveway283.7to165771 feet 3.0-4.0290.3 Cross Slope (PAR)SF10291.3to $120 $1,23015483010ft feet 2.0-3.0291.8 Cross Slope (PAR)SF17293.5to $120 $2,09115483110ft feet 4.0-5.0304.8 Cross Slope (PAR)SF13306.1to $120 $1,59915483210ft feet306.1 Driveway342.2to165772 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 772 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING BEFORE S DOWNEY RD End Street Name 2001151335 Run ID E 26Th St 55.5 ID Sidewalk Width Priority feet -.31313.0 Vertical Change REF10314.0to137555 10 ft feet .27329.1 Vertical Change REF10330.1to137556 10 ft feet 5.0-6.0343.1 Cross Slope (PAR)SF45347.5to $120 $5,41215483310ft feet 2.0-3.0354.1 Cross Slope (PAR)SF23356.3to $120 $2,70615483410ft feet 2.0-3.0367.8 Cross Slope (PAR)SF13369.1to $120 $1,59915483510ft feet 2.0-3.0372.7 Cross Slope (PAR)SF15374.2to $120 $1,84515483610ft feet 2.0-3.0380.8 Cross Slope (PAR)SF16382.4to $120 $1,96815483710ft feet 2.0-3.0385.5 Cross Slope (PAR)SF18387.3to $120 $2,21415483810ft feet 2.0-3.0390.2 Cross Slope (PAR)SF256415.2to $120 $30,75015483910ft feet 2.0-3.0417.8 Cross Slope (PAR)SF118429.3to $120 $14,14515484010ft feet 4.0-5.0430.1 Cross Slope (PAR)SF21432.1to $120 $2,46015484110ft feet432.1 Driveway464.3to165773 feet432.1 Driveway530.5to165774 feet -.28441.0 Vertical Change REF29443.8to137557 10 ft feet 4.0-5.0467.3 Cross Slope (Driveway)SF64473.5to $40 $2,54215484210ft feet -.27470.1 Vertical Change REF10471.1to137558 10 ft feet 3.0-4.0479.7 Cross Slope (Driveway)SF11480.8to $40 $45115484310ft feet 2.0-3.0480.8 Cross Slope (Driveway)SF33484.0to $40 $1,31215484410ft feet 4.0-5.0484.2 Cross Slope (Driveway)SF10485.2to $40 $41015484510ft feet 4.0-5.0487.8 Cross Slope (Driveway)SF17489.5to $40 $69715484610ft feet 5.0-6.0493.0 Cross Slope (Driveway)SF23495.2to $40 $90215484710ft feet .38496.8 Vertical Change REF10497.8to137559 10 ft feet 2.0-3.0500.2 Cross Slope (Driveway)SF160515.8to $40 $6,39615484810ft feet 4.0-5.0516.3 Cross Slope (Driveway)SF19518.2to $40 $77915484910ft feet 3.47520.2 Vertical Change REF10521.2to137560 10 ft feet 3.0-4.0522.7 Cross Slope (Driveway)SF36526.2to $40 $1,43515485010ft $158,126.75TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 773 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151531 Run ID E 26Th St 42.75 ID Sidewalk Width Priority feet 4.0-5.00.5 Cross Slope (PAR)SF112.6to $120 $1,2601542655ft feet0.5 Continuous Width SF51.5to $120 $6001675985ft feet3.3 Driveway47.0to165729 feet .7310.6 Vertical Change REF511.6to137454 5 ft feet .5135.9 Vertical Change REF536.9to137455 5 ft feet 4.0-5.048.7 Cross Slope (PAR)SF750.1to $120 $8401542665ft feet 2.0-3.072.0 Cross Slope (PAR)SF873.5to $120 $9001542675ft feet 5.0-6.082.0 Cross Slope (PAR)SF1284.3to $120 $1,3801542685ft feet83.9 Continuous Width SF584.9to $120 $6001668335ft feet 3.0-4.085.6 Cross Slope (PAR)SF887.2to $120 $9601542695ft feet 2.0-3.090.8 Cross Slope (PAR)SF591.8to $120 $6001542705ft feet 2.0-3.095.5 Cross Slope (PAR)SF596.5to $120 $6001542715ft feet .26103.9 Vertical Change LF5104.9to $75 $3751374565ft feet 3.0-4.0108.6 Cross Slope (PAR)SF5109.6to $120 $6001542725ft feet123.3 Continuous Width SF5124.3to $120 $6001676505ft feet 2.0-3.0125.0 Cross Slope (PAR)SF10126.9to $120 $1,1401542735ft feet127.8 Driveway145.7to165730 feet 3.0-4.0145.7 Cross Slope (Driveway)SF14148.5to $40 $5601542745ft feet 2.0-3.0183.3 Cross Slope (PAR)SF8184.9to $120 $9601542755ft feet 2.0-3.0188.3 Cross Slope (PAR)SF82204.6to $120 $9,7801542765ft feet198.8 Continuous Width REF5199.8to167708 5 ft feet206.3 Driveway258.6to165731 feet 2.0-3.0260.9 Cross Slope (PAR)SF14263.6to $120 $1,6201542775ft feet262.9 Continuous Width REF5263.9to167691 5 ft feet 2.0-3.0267.0 Cross Slope (PAR)SF8268.6to $120 $9601542785ft feet 5.0-6.0270.3 Cross Slope (PAR)SF8271.8to $120 $9001542795ft feet 3.0-4.0272.9 Cross Slope (PAR)SF20276.8to $120 $2,3401542805ft feet278.8 Continuous Width SF5279.8to $120 $6001673235ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 774 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name SIERRA PINE AVE End Street Name 2001151531 Run ID E 26Th St 42.75 ID Sidewalk Width Priority feet 6.0-7.0282.7 Cross Slope (PAR)SF6283.8to $120 $6601542815ft feet 4.0-5.0290.1 Cross Slope (PAR)SF9291.9to $120 $1,0801542825ft feet290.3 Continuous Width REF5291.3to167692 5 ft feet293.3 Driveway318.8to165732 feet293.3 Driveway360.7to165733 feet -.48304.6 Vertical Change REF5305.6to137457 5 ft feet 3.0-4.0323.8 Cross Slope (Driveway)SF13326.4to $40 $5201542835ft feet 2.0-3.0326.8 Cross Slope (Driveway)SF8328.3to $40 $3001542845ft feet 3.0-4.0331.8 Cross Slope (Driveway)SF5332.8to $40 $2001542855ft feet 5.0-6.0333.3 Cross Slope (Driveway)SF18336.8to $40 $7001542865ft feet333.8 Continuous Width REF5334.8to166879 5 ft feet 3.0-4.0338.4 Cross Slope (Driveway)SF26343.6to $40 $1,0401542875ft feet 2.0-3.0344.4 Cross Slope (Driveway)SF10346.4to $40 $4001542885ft feet344.8 Continuous Width REF5345.8to167693 5 ft feet 4.0-5.0353.3 Cross Slope (Driveway)SF10355.3to $40 $4001542895ft feet 5.0-6.0358.4 Running Slope REF7359.8to166511 5 ft $33,475.00TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 775 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151456 Run ID E 26Th St 87.25 ID Sidewalk Width Priority feet 2.0-3.00.8 Cross Slope (PAR)SF235.1to $120 $2,7091544375ft feet 2.0-3.07.8 Cross Slope (PAR)SF99.5to $120 $1,0711544385ft feet 5.0-6.010.5 Cross Slope (PAR)SF3817.8to $120 $4,5991544395ft feet 3.0-4.020.3 Cross Slope (PAR)SF2825.7to $120 $3,4021544405ft feet -.3526.1 Vertical Change LF527.1to $75 $3941374765ft feet 2.0-3.027.4 Cross Slope (PAR)SF3534.1to $120 $4,2211544415ft feet 2.0-3.039.1 Cross Slope (PAR)SF640.3to $120 $7561544425ft feet 2.0-3.044.7 Cross Slope (PAR)SF1647.8to $120 $1,9531544435ft feet 4.0-5.049.3 Cross Slope (PAR)SF7062.6to $120 $8,3791544445ft feet .3649.9 Vertical Change REF550.9to137477 5 ft feet 2.0-3.063.7 Cross Slope (PAR)SF865.2to $120 $9451544455ft feet 3.0-4.067.8 Cross Slope (PAR)SF3975.3to $120 $4,7251544465ft feet 4.0-5.079.1 Cross Slope (PAR)SF2884.4to $120 $3,3391544475ft feet 2.0-3.086.3 Cross Slope (PAR)SF587.3to $120 $6301544485ft feet 2.0-3.090.2 Cross Slope (PAR)SF1693.3to $120 $1,9531544495ft feet 4.0-5.096.0 Cross Slope (PAR)SF1398.5to $120 $1,5751544505ft feet 4.0-5.0101.3 Cross Slope (PAR)SF25106.0to $120 $2,9611544515ft feet 3.0-4.0108.2 Cross Slope (PAR)SF47117.1to $120 $5,6071544525ft feet 4.0-5.0124.8 Cross Slope (PAR)SF44133.1to $120 $5,2291544535ft feet 5.0-6.0130.8 Running Slope REF7132.1to166516 5 ft feet133.3 Driveway197.2to165740 feet .51182.8 Vertical Change REF5183.8to137478 5 ft feet 4.0-5.0198.8 Cross Slope (PAR)SF18202.2to $120 $2,1421544545ft feet 4.0-5.0206.7 Cross Slope (PAR)SF16209.8to $120 $1,9531544555ft feet 3.0-4.0214.3 Cross Slope (PAR)SF92231.9to $120 $11,0881544565ft feet232.0 Driveway276.5to165741 feet 3.0-4.0276.8 Cross Slope (PAR)SF49286.2to $120 $5,9221544575ft feet 5.0-6.0287.3 Cross Slope (PAR)SF16290.3to $120 $1,8901544585ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 776 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151456 Run ID E 26Th St 87.25 ID Sidewalk Width Priority feet 3.0-4.0290.3 Cross Slope (PAR)SF23294.7to $120 $2,7721544595ft feet 2.0-3.0296.3 Cross Slope (PAR)SF6297.5to $120 $7561544605ft feet 2.0-3.0302.3 Cross Slope (PAR)SF22306.4to $120 $2,5831544615ft feet 3.0-4.0309.3 Cross Slope (PAR)SF33315.5to $120 $3,9061544625ft feet 5.0-6.0315.2 Running Slope REF8316.8to166517 5 ft feet318.3 Driveway366.2to165742 feet 2.0-3.0368.4 Cross Slope (PAR)SF30374.1to $120 $3,5911544635ft feet 3.0-4.0377.9 Cross Slope (PAR)SF44386.3to $120 $5,2921544645ft feet 3.0-4.0390.9 Cross Slope (PAR)SF9392.7to $120 $1,1341544655ft feet 4.0-5.0395.3 Cross Slope (PAR)SF25400.0to $120 $2,9611544665ft feet 2.0-3.0408.1 Cross Slope (PAR)SF59419.3to $120 $7,0561544675ft feet -.26417.5 Vertical Change REF5418.5to137479 5 ft feet 2.0-3.0424.6 Cross Slope (PAR)SF9426.4to $120 $1,1341544685ft feet429.6 Driveway464.9to165743 feet 3.0-4.0467.2 Cross Slope (PAR)SF8468.7to $120 $9451544695ft feet 3.0-4.0471.4 Cross Slope (PAR)SF13473.8to $120 $1,5121544705ft feet 2.0-3.0474.1 Cross Slope (PAR)SF81489.6to $120 $9,7651544715ft feet 3.0-4.0492.4 Cross Slope (PAR)SF25497.2to $120 $3,0241544725ft feet 2.0-3.0497.9 Cross Slope (PAR)SF55508.3to $120 $6,5521544735ft feet .31511.5 Vertical Change LF5512.5to $75 $3941374805ft feet 2.0-3.0517.3 Cross Slope (PAR)SF16520.3to $120 $1,8901544745ft feet 3.0-4.0522.4 Cross Slope (PAR)SF14525.1to $120 $1,7011544755ft feet 2.0-3.0525.1 Cross Slope (PAR)SF6526.3to $120 $7561544765ft feet 2.0-3.0530.3 Cross Slope (PAR)SF9532.0to $120 $1,0711544775ft feet -.39533.7 Vertical Change LF5534.7to $75 $3941374815ft feet534.5 Driveway563.0to165744 feet 3.0-4.0563.7 Cross Slope (PAR)SF54573.9to $120 $6,4261544785ft feet 5.0-6.0575.8 Cross Slope (PAR)SF16578.8to $120 $1,8901544795ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 777 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151456 Run ID E 26Th St 87.25 ID Sidewalk Width Priority feet 3.0-4.0583.3 Cross Slope (PAR)SF11585.4to $120 $1,3231544805ft feet 5.0-6.0585.4 Cross Slope (PAR)SF5586.4to $120 $6301544815ft feet 6.0-7.0586.9 Cross Slope (PAR)SF8588.5to $120 $1,0081544825ft feet 5.0-6.0591.8 Cross Slope (PAR)SF28597.1to $120 $3,3391544835ft feet 3.0-4.0597.8 Cross Slope (PAR)SF24602.3to $120 $2,8351544845ft feet 5.0-6.0602.3 Cross Slope (PAR)SF19605.9to $120 $2,2681544855ft feet606.7 Driveway642.0to165745 feet 2.0-3.0643.3 Cross Slope (PAR)SF46652.0to $120 $5,4811544865ft feet 2.0-3.0655.4 Cross Slope (PAR)SF17658.7to $120 $2,0791544875ft feet658.8 Driveway697.7to165746 feet 2.0-3.0729.1 Cross Slope (PAR)SF33735.3to $120 $3,9061544885ft feet 2.0-3.0739.4 Cross Slope (PAR)SF57750.3to $120 $6,8671544895ft feet 2.0-3.0759.3 Cross Slope (PAR)SF36766.2to $120 $4,3471544905ft feet 4.0-5.0770.7 Cross Slope (PAR)SF30776.4to $120 $3,5911544915ft feet 4.0-5.0779.7 Cross Slope (PAR)SF8781.2to $120 $9451544925ft feet 4.0-5.0783.9 Cross Slope (PAR)SF13786.3to $120 $1,5121544935ft feet 4.0-5.0788.5 Cross Slope (PAR)SF42796.5to $120 $5,0401544945ft feet 4.0-5.0801.8 Cross Slope (PAR)SF6802.9to $120 $6931544955ft feet 4.0-5.0805.2 Cross Slope (PAR)SF32811.2to $120 $3,7801544965ft feet 2.0-3.0812.8 Cross Slope (PAR)SF5813.8to $120 $6301544975ft feet814.8 Driveway856.2to165747 feet 4.0-5.0856.2 Cross Slope (Driveway)SF19859.9to $40 $7771544985ft feet 3.0-4.0862.9 Cross Slope (PAR)SF8864.4to $120 $9451544995ft feet 2.0-3.0865.0 Cross Slope (PAR)SF88881.8to $120 $10,5841545005ft feet 1.82876.2 Vertical Change REF5877.2to137482 5 ft feet 5.0-6.0883.4 Cross Slope (PAR)SF29889.0to $120 $3,5281545015ft feet 3.0-4.0890.1 Cross Slope (PAR)SF13892.5to $120 $1,5121545025ft feet 2.0-3.0892.9 Cross Slope (PAR)SF52902.8to $120 $6,2371545035ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 778 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151456 Run ID E 26Th St 87.25 ID Sidewalk Width Priority feet 2.0-3.0907.3 Cross Slope (PAR)SF7908.6to $120 $8191545045ft feet 4.0-5.0910.5 Cross Slope (PAR)SF7911.8to $120 $8191545055ft feet .37913.9 Vertical Change LF5914.9to $75 $3941374835ft feet 3.0-4.0915.1 Cross Slope (PAR)SF26920.1to $120 $3,1501545065ft feet 2.0-3.0920.8 Cross Slope (PAR)SF24925.3to $120 $2,8351545075ft feet 4.0-5.0927.6 Cross Slope (PAR)SF22931.7to $120 $2,5831545085ft feet 2.0-3.0932.5 Cross Slope (PAR)SF26937.5to $120 $3,1501545095ft feet 3.0-4.0944.7 Cross Slope (PAR)SF15947.6to $120 $1,8271545105ft feet 2.0-3.0949.0 Cross Slope (PAR)SF46957.8to $120 $5,5441545115ft feet 2.0-3.0965.0 Cross Slope (PAR)SF57975.9to $120 $6,8671545125ft feet 3.0-4.0978.2 Cross Slope (PAR)SF1551007.8to $120 $18,6481545135ft feet 2.0-3.01008.8 Cross Slope (PAR)SF181012.3to $120 $2,2051545145ft feet 4.0-5.01013.8 Cross Slope (PAR)SF61014.9to $120 $6931545155ft feet 2.0-3.01016.3 Cross Slope (PAR)SF291021.9to $120 $3,5281545165ft feet 4.0-5.01022.3 Cross Slope (PAR)SF321028.4to $120 $3,8431545175ft feet 3.0-4.01030.9 Cross Slope (PAR)SF201034.8to $120 $2,4571545185ft feet 2.0-3.01042.7 Cross Slope (PAR)SF291048.3to $120 $3,5281545195ft feet1048.9 Continuous Width REF51049.9to167203 5 ft feet 2.0-3.01052.8 Cross Slope (PAR)SF451061.3to $120 $5,3551545205ft feet1062.1 Cold Patch 181065.6to140508 5 ft feet 3.0-4.01068.7 Cross Slope (PAR)SF71070.0to $120 $8191545215ft feet1074.3 Cold Patch 181077.8to140509 5 ft feet 2.0-3.01081.9 Cross Slope (PAR)SF291087.4to $120 $3,4651545225ft feet 3.0-4.01091.9 Cross Slope (PAR)SF681104.8to $120 $8,1271545235ft feet 4.0-5.01107.6 Cross Slope (PAR)SF211111.6to $120 $2,5201545245ft feet 2.0-3.01111.8 Cross Slope (PAR)SF321117.9to $120 $3,8431545255ft feet 4.0-5.01119.3 Cross Slope (PAR)SF181122.8to $120 $2,2051545265ft feet 2.0-3.01123.8 Cross Slope (PAR)SF131126.2to $120 $1,5121545275ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 779 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name S SOTO ST End Street Name 2001151456 Run ID E 26Th St 87.25 ID Sidewalk Width Priority feet 4.0-5.01132.0 Cross Slope (PAR)SF71133.4to $120 $8821545285ft feet 4.0-5.01136.3 Cross Slope (PAR)SF221140.5to $120 $2,6461545295ft feet 4.0-5.01142.9 Cross Slope (PAR)SF301148.7to $120 $3,6541545305ft feet 3.0-4.01161.7 Cross Slope (PAR)SF61162.9to $120 $7561545315ft feet 3.0-4.01168.8 Cross Slope (PAR)SF51169.8to $120 $6301545325ft feet 3.0-4.01172.5 Cross Slope (PAR)SF51173.5to $120 $6301545335ft feet1173.0 Continuous Width SF51174.0to $120 $6301669985ft feet 2.0-3.01173.5 Cross Slope (PAR)SF51174.5to $120 $6301545345ft feet 2.0-3.01177.1 Cross Slope (PAR)SF71178.5to $120 $8821545355ft $320,880.00TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING (3211 E 26TH ST) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 780 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151523 Run ID E 26Th St 74.25 ID Sidewalk Width Priority feet 2.0-3.013.3 Cross Slope (PAR)SF7227.6to $120 $8,5801542905ft feet14.0 Continuous Width REF515.0to166861 5 ft feet19.5 Continuous Width SF520.5to $120 $6001676515ft feet 3.0-4.034.9 Cross Slope (PAR)SF1437.7to $120 $1,6801542915ft feet 3.0-4.042.4 Cross Slope (PAR)SF843.9to $120 $9001542925ft feet 3.0-4.048.8 Cross Slope (PAR)SF950.6to $120 $1,0801542935ft feet 4.0-5.053.3 Cross Slope (PAR)SF854.8to $120 $9001542945ft feet 4.0-5.062.7 Cross Slope (PAR)SF663.8to $120 $6601542955ft feet 2.0-3.067.1 Cross Slope (PAR)SF1369.7to $120 $1,5601542965ft feet 3.0-4.078.3 Cross Slope (PAR)SF1380.8to $120 $1,5001542975ft feet80.8 Continuous Width SF581.8to $120 $6001676525ft feet 2.0-3.081.0 Cross Slope (PAR)SF682.1to $120 $6601542985ft feet 1.3985.0 Vertical Change SF586.0to $75 $3751374585ft feet 2.0-3.086.6 Cross Slope (PAR)SF687.8to $120 $7201542995ft feet 2.0-3.096.9 Cross Slope (PAR)SF18100.4to $120 $2,1001543005ft feet 3.0-4.0111.0 Cross Slope (PAR)SF38118.6to $120 $4,5601543015ft feet 2.0-3.0118.6 Cross Slope (PAR)SF8120.2to $120 $9601543025ft feet 2.0-3.0123.8 Cross Slope (PAR)SF5124.8to $120 $6001543035ft feet 3.0-4.0137.5 Cross Slope (PAR)SF6138.7to $120 $7201543045ft feet .27138.3 Vertical Change REF5139.3to137459 5 ft feet 5.0-6.0141.1 Cross Slope (PAR)SF8142.6to $120 $9001543055ft feet 3.49142.7 Vertical Change SF5143.7to $75 $3751374605ft feet 2.0-3.0144.0 Cross Slope (PAR)SF83160.6to $120 $9,9601543065ft feet145.5 Continuous Width SF5146.5to $120 $6001676535ft feet .31145.6 Vertical Change REF5146.6to137461 5 ft feet158.4 Continuous Width REF5159.4to167257 5 ft feet 2.0-3.0169.8 Cross Slope (PAR)SF33176.3to $120 $3,9001543075ft feet183.6 Continuous Width REF5184.6to167807 5 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 781 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151523 Run ID E 26Th St 74.25 ID Sidewalk Width Priority feet 2.0-3.0190.3 Cross Slope (PAR)SF79206.0to $120 $9,4201543085ft feet 1.35195.0 Vertical Change REF5196.0to137462 5 ft feet 3.0-4.0212.4 Cross Slope (PAR)SF34219.1to $120 $4,0201543095ft feet 4.0-5.0221.5 Cross Slope (PAR)SF14224.3to $120 $1,6801543105ft feet 2.0-3.0225.4 Cross Slope (PAR)SF10227.3to $120 $1,1401543115ft feet 4.0-5.0229.2 Cross Slope (PAR)SF9230.9to $120 $1,0201543125ft feet 3.0-4.0234.0 Cross Slope (PAR)SF9235.8to $120 $1,0801543135ft feet 2.37254.4 Vertical Change REF5255.4to137463 5 ft feet 2.0-3.0254.8 Cross Slope (PAR)SF24259.5to $120 $2,8201543145ft feet256.8 Continuous Width SF5257.8to $120 $6001676545ft feet -.27257.1 Vertical Change REF5258.1to137464 5 ft feet 2.64260.6 Vertical Change SF5261.6to $75 $3751374655ft feet 3.0-4.0263.3 Cross Slope (PAR)SF9265.0to $120 $1,0201543155ft feet 2.0-3.0265.0 Cross Slope (PAR)SF13267.5to $120 $1,5001543165ft feet 3.0-4.0273.8 Cross Slope (PAR)SF15276.8to $120 $1,8001543175ft feet 2.0-3.0277.5 Cross Slope (PAR)SF5278.5to $120 $6001543185ft feet279.9 Driveway342.5to165734 feet 4.0-5.0343.7 Cross Slope (PAR)SF16346.8to $120 $1,8601543195ft feet 2.0-3.0346.8 Cross Slope (PAR)SF35353.7to $120 $4,1401543205ft feet348.8 Continuous Width REF5349.8to166862 5 ft feet 2.88357.7 Vertical Change REF5358.7to137466 5 ft feet 3.0-4.0358.0 Cross Slope (PAR)SF14360.8to $120 $1,6801543215ft feet 4.0-5.0363.3 Cross Slope (PAR)SF8364.9to $120 $9601543225ft feet 2.0-3.0366.3 Cross Slope (PAR)SF17369.7to $120 $2,0401543235ft feet 4.0-5.0370.7 Cross Slope (PAR)SF36377.8to $120 $4,2601543245ft feet 2.0-3.0377.8 Cross Slope (PAR)SF26382.9to $120 $3,0601543255ft feet 4.0-5.0383.6 Cross Slope (PAR)SF11385.8to $120 $1,3201543265ft feet 2.0-3.0388.9 Cross Slope (PAR)SF5389.9to $120 $6001543275ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 782 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 26TH ST Street Side TRAIN CROSSING (3211 E 26TH ST) Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 2001151523 Run ID E 26Th St 74.25 ID Sidewalk Width Priority feet 5.0-6.0391.3 Cross Slope (PAR)SF23395.8to $120 $2,7001543285ft feet 3.0-4.0396.0 Cross Slope (PAR)SF16399.2to $120 $1,9201543295ft feet 3.0-4.0401.3 Cross Slope (PAR)SF7402.7to $120 $8401543305ft feet 2.0-3.0402.7 Cross Slope (PAR)SF126427.8to $120 $15,0601543315ft feet415.2 Continuous Width SF5416.2to $120 $6001676555ft feet 4.0-5.0429.3 Cross Slope (PAR)SF135456.3to $120 $16,2001543325ft feet 3.0-4.0461.8 Cross Slope (PAR)SF11463.9to $120 $1,2601543335ft feet 2.0-3.0467.8 Cross Slope (PAR)SF20471.7to $120 $2,3401543345ft feet 4.0-5.0472.6 Cross Slope (PAR)SF79488.3to $120 $9,4201543355ft feet479.6 Continuous Width SF5480.6to $120 $6001676565ft feet .5491.6 Vertical Change REF5492.6to137467 5 ft feet 4.0-5.0491.6 Cross Slope (PAR)SF20495.5to $120 $2,3401543365ft feet 5.0-6.0497.8 Cross Slope (PAR)SF30503.8to $120 $3,6001543375ft feet -.41500.3 Vertical Change REF5501.3to137468 5 ft feet 3.0-4.0504.7 Cross Slope (PAR)SF6505.8to $120 $6601543385ft feet 2.0-3.0505.9 Cross Slope (PAR)SF21510.0to $120 $2,4601543395ft feet 5.0-6.0510.5 Cross Slope (PAR)SF6511.6to $120 $6601543405ft feet -.3522.8 Vertical Change LF5523.8to $75 $3751374695ft feet 3.0-4.0530.1 Cross Slope (PAR)SF46539.3to $120 $5,5201543415ft feet 2.0-3.0545.4 Cross Slope (PAR)SF54556.1to $120 $6,4201543425ft feet 2.0-3.0559.4 Cross Slope (PAR)SF12561.8to $120 $1,4401543435ft feet 6.0-7.0559.8 Running Slope REF10561.7to166512 5 ft $165,900.00TOTAL COST FOR:E 26TH STSside of Starting at:TRAIN CROSSING (3211 E 26TH ST) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 783 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING (3305 E 26TH ST) Survey Street Name Starting Street Name TRAIN CROSSING (3211 E 26TH ST) End Street Name 2001151447 Run ID E 26Th St 42 ID Sidewalk Width Priority feet 3.0-4.01.2 Cross Slope (PAR)SF162.8to $120 $1,96815453610ft feet 2.0-3.05.3 Cross Slope (PAR)SF7812.9to $120 $9,34815453710ft feet 3.0-4.015.5 Cross Slope (PAR)SF10625.8to $120 $12,66915453810ft feet 5.0-6.032.3 Cross Slope (PAR)SF5637.8to $120 $6,76515453910ft feet 5.0-6.044.5 Cross Slope (PAR)SF2747.1to $120 $3,19815454010ft feet 2.0-3.048.8 Cross Slope (PAR)SF8657.2to $120 $10,33215454110ft feet 3.0-4.061.0 Cross Slope (PAR)SF11772.4to $120 $14,02215454210ft feet 2.0-3.072.9 Cross Slope (PAR)SF8080.7to $120 $9,59415454310ft feet 3.0-4.083.8 Cross Slope (PAR)SF1685.4to $120 $1,96815454410ft feet 2.0-3.090.4 Cross Slope (PAR)SF5996.2to $120 $7,13415454510ft feet 4.0-5.096.3 Cross Slope (PAR)SF149110.8to $120 $17,83515454610ft feet 2.0-3.0110.8 Cross Slope (PAR)SF18112.6to $120 $2,21415454710ft feet 4.0-5.0113.6 Cross Slope (PAR)SF12114.8to $120 $1,47615454810ft feet 2.0-3.0118.4 Cross Slope (PAR)SF16120.0to $120 $1,96815454910ft feet .32119.3 Vertical Change REF10120.3to137484 10 ft feet124.8 Driveway149.4to165748 feet 2.0-3.0164.3 Cross Slope (PAR)SF10165.3to $120 $1,23015455010ft feet166.5 Driveway217.8to165749 feet 2.39219.5 Vertical Change REF10220.5to137485 10 ft feet 2.0-3.0220.0 Cross Slope (PAR)SF38223.7to $120 $4,55115455110ft feet 3.0-4.0229.5 Cross Slope (PAR)SF75236.8to $120 $8,97915455210ft feet 2.0-3.0239.6 Cross Slope (PAR)SF15241.1to $120 $1,84515455310ft feet 3.0-4.0243.4 Cross Slope (PAR)SF19245.3to $120 $2,33715455410ft feet 2.0-3.0245.3 Cross Slope (PAR)SF135258.5to $120 $16,23615455510ft feet 4.0-5.0259.8 Cross Slope (PAR)SF123271.8to $120 $14,76015455610ft feet 4.0-5.0277.4 Cross Slope (PAR)SF110288.1to $120 $13,16115455710ft feet 4.0-5.0294.1 Cross Slope (PAR)SF127306.5to $120 $15,25215455810ft feet 3.0-4.0311.3 Cross Slope (PAR)SF33314.5to $120 $3,93615455910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 784 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes NE E 26TH ST Street Side TRAIN CROSSING (3305 E 26TH ST) Survey Street Name Starting Street Name TRAIN CROSSING (3211 E 26TH ST) End Street Name 2001151447 Run ID E 26Th St 42 ID Sidewalk Width Priority feet 3.0-4.0318.4 Cross Slope (PAR)SF47323.0to $120 $5,65815456010ft feet 2.0-3.0323.5 Cross Slope (PAR)SF107333.9to $120 $12,79215456110ft feet 4.0-5.0338.5 Cross Slope (PAR)SF45342.9to $120 $5,41215456210ft feet 4.0-5.0345.0 Cross Slope (PAR)SF10346.0to $120 $1,23015456310ft feet 4.0-5.0348.6 Cross Slope (PAR)SF103358.6to $120 $12,30015456410ft feet 2.0-3.0359.8 Cross Slope (PAR)SF26362.3to $120 $3,07515456510ft feet362.9 Driveway401.4to165750 feet 2.0-3.0402.2 Cross Slope (PAR)SF97411.7to $120 $11,68515456610ft feet 6.0-7.0422.3 Cross Slope (PAR)SF25424.7to $120 $2,95215456710ft feet 2.0-3.0428.3 Cross Slope (PAR)SF97437.8to $120 $11,68515456810ft feet 2.0-3.0443.8 Cross Slope (PAR)SF96453.2to $120 $11,56215456910ft feet 2.0-3.0456.1 Cross Slope (PAR)SF64462.3to $120 $7,62615457010ft feet 4.0-5.0463.5 Cross Slope (PAR)SF36467.0to $120 $4,30515457110ft feet 2.0-3.0468.7 Cross Slope (PAR)SF91477.6to $120 $10,94715457210ft feet 2.0-3.0481.8 Cross Slope (PAR)SF33485.0to $120 $3,93615457310ft feet 2.0-3.0492.6 Cross Slope (PAR)SF36496.1to $120 $4,30515457410ft feet 2.0-3.0498.9 Cross Slope (PAR)SF30501.8to $120 $3,56715457510ft feet 4.0-5.0508.8 Cross Slope (PAR)SF12510.0to $120 $1,47615457610ft feet513.3 Driveway573.8to165751 $297,291.00TOTAL COST FOR:E 26TH STNEside of Starting at:TRAIN CROSSING (3305 E 26TH ST) October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 785 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW E 26TH ST Street Side TRAIN CROSSING BEFORE S DOWNEY RD Survey Street Name Starting Street Name S DOWNEY RD End Street Name 2001151340 Run ID E 26Th St 73 ID Sidewalk Width Priority feet 3.0-4.02.2 Cross Slope (PAR)SF53.3to $120 $5611547844ft feet 2.0-3.03.6 Cross Slope (PAR)SF3912.7to $120 $4,6411547854ft feet 3.0-4.017.6 Cross Slope (PAR)SF2323.1to $120 $2,8051547864ft feet 5.0-6.024.3 Cross Slope (PAR)SF725.9to $120 $8161547874ft feet .4124.5 Vertical Change REF425.5to137546 4 ft feet 6.0-7.026.3 Cross Slope (PAR)SF627.8to $120 $7651547884ft feet 4.0-5.028.3 Cross Slope (PAR)SF529.5to $120 $6121547894ft feet 3.0-4.032.1 Cross Slope (PAR)SF2638.3to $120 $3,1621547904ft feet -.8736.8 Vertical Change REF437.8to137547 4 ft feet39.3 Driveway102.1to165768 feet -.3657.3 Vertical Change REF458.3to137548 4 ft feet .2988.4 Vertical Change REF489.4to137549 4 ft feet 5.0-6.0103.7 Cross Slope (PAR)SF4104.7to $120 $5101547914ft feet 6.0-7.0112.9 Cross Slope (PAR)SF6114.3to $120 $7141547924ft feet 5.0-6.0114.3 Cross Slope (PAR)SF20118.9to $120 $2,3461547934ft feet 4.0-5.0121.1 Cross Slope (PAR)SF15124.7to $120 $1,8361547944ft feet 5.0-6.0129.3 Cross Slope (PAR)SF11131.8to $120 $1,2751547954ft feet 3.0-4.0135.1 Cross Slope (PAR)SF6136.4to $120 $6631547964ft feet 2.0-3.0136.6 Cross Slope (PAR)SF61151.0to $120 $7,3441547974ft feet158.8 Driveway177.1to165769 feet 3.0-4.0178.1 Cross Slope (PAR)SF4179.1to $120 $5101547984ft feet 3.0-4.0181.8 Cross Slope (PAR)SF9183.8to $120 $1,0201547994ft feet185.2 Cold Patch 14188.6to140523 4 ft feet .34186.4 Vertical Change LF4187.4to $75 $3191375504ft feet 2.0-3.0210.4 Cross Slope (PAR)SF8212.3to $120 $9691548004ft feet 2.0-3.0224.1 Cross Slope (PAR)SF10226.4to $120 $1,1731548014ft feet 2.0-3.0242.3 Cross Slope (PAR)SF14245.6to $120 $1,6831548024ft feet -.42243.9 Vertical Change REF4244.9to137551 4 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 786 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes SW E 26TH ST Street Side TRAIN CROSSING BEFORE S DOWNEY RD Survey Street Name Starting Street Name S DOWNEY RD End Street Name 2001151340 Run ID E 26Th St 73 ID Sidewalk Width Priority feet 2.0-3.0250.4 Cross Slope (PAR)SF34258.3to $120 $4,0291548034ft feet .28310.4 Vertical Change REF4311.4to137553 4 ft feet 2.0-3.0310.5 Cross Slope (PAR)SF5311.7to $120 $6121548044ft feet 3.0-4.0314.8 Cross Slope (PAR)SF9316.8to $120 $1,0201548054ft feet 2.0-3.0317.8 Cross Slope (PAR)SF6319.3to $120 $7651548064ft feet 3.0-4.0321.7 Cross Slope (PAR)SF5322.8to $120 $5611548074ft feet 2.0-3.0326.2 Cross Slope (PAR)SF11328.8to $120 $1,3261548084ft $42,036.75TOTAL COST FOR:E 26TH STSWside of Starting at:TRAIN CROSSING BEFORE S DOWNEY RD October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 787 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 27TH ST Street Side 2200 E 27TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911211513 Run ID E 27Th St 79.5 ID Sidewalk Width Priority feet 3.0-4.00.3 Cross Slope (PAR)SF151.9to $120 $1,7761417949ft feet1.9 Driveway45.8to164569 feet 2.0-3.046.4 Cross Slope (Driveway)SF1648.1to $40 $6291417959ft feet 3.0-4.050.2 Cross Slope (PAR)SF1051.3to $120 $1,2211417969ft feet 2.0-3.051.8 Cross Slope (PAR)SF11664.3to $120 $13,8751417979ft feet 4.0-5.064.3 Cross Slope (PAR)SF5169.8to $120 $6,1051417989ft feet .5565.0 Vertical Change REF966.0to133480 9 ft feet 3.0-4.072.0 Cross Slope (PAR)SF973.0to $120 $1,1101417999ft feet 2.0-3.073.0 Cross Slope (PAR)SF1074.1to $120 $1,2211418009ft feet 2.0-3.076.2 Cross Slope (PAR)SF3179.5to $120 $3,6631418019ft feet 4.0-5.079.8 Cross Slope (PAR)SF14094.9to $120 $16,7611418029ft feet 2.0-3.094.9 Cross Slope (PAR)SF204117.0to $120 $24,5311418039ft feet 2.0-3.0120.4 Cross Slope (PAR)SF138135.3to $120 $16,5391418049ft feet -.31127.9 Vertical Change REF9128.9to133481 9 ft feet 4.0-5.0135.3 Cross Slope (PAR)SF27138.2to $120 $3,2191418059ft feet 2.0-3.0143.8 Cross Slope (PAR)SF43148.5to $120 $5,2171418069ft feet 4.0-5.0148.5 Cross Slope (PAR)SF17150.3to $120 $1,9981418079ft feet 3.0-4.0152.4 Cross Slope (PAR)SF100163.2to $120 $11,9881418089ft feet 2.0-3.0163.2 Cross Slope (PAR)SF37167.2to $120 $4,4401418099ft feet 4.0-5.0167.2 Cross Slope (PAR)SF10168.3to $120 $1,2211418109ft feet168.3 Driveway201.2to164570 feet -.69183.6 Vertical Change REF9184.6to133482 9 ft feet .27196.5 Vertical Change REF9197.5to133483 9 ft feet 2.0-3.0201.2 Cross Slope (Driveway)SF61207.8to $40 $2,4421418119ft feet 4.0-5.0207.8 Cross Slope (PAR)SF166225.7to $120 $19,8691418129ft feet 2.0-3.0226.5 Cross Slope (PAR)SF12227.8to $120 $1,4431418139ft feet 2.0-3.0231.0 Cross Slope (PAR)SF22233.4to $120 $2,6641418149ft feet 2.0-3.0241.3 Cross Slope (PAR)SF262269.6to $120 $31,4131418159ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 788 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 27TH ST Street Side 2200 E 27TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911211513 Run ID E 27Th St 79.5 ID Sidewalk Width Priority feet .32267.8 Vertical Change REF9268.8to133484 9 ft feet 4.0-5.0269.8 Cross Slope (PAR)SF302302.4to $120 $36,1861418169ft feet 2.0-3.0302.4 Cross Slope (PAR)SF46307.4to $120 $5,5501418179ft feet 2.0-3.0312.5 Cross Slope (PAR)SF308345.8to $120 $36,9631418189ft feet 3.0-4.0348.0 Cross Slope (PAR)SF40352.3to $120 $4,7731418199ft feet 2.0-3.0352.3 Cross Slope (PAR)SF164370.0to $120 $19,6471418209ft feet 2.0-3.0374.2 Cross Slope (PAR)SF44379.0to $120 $5,3281418219ft feet .54376.2 Vertical Change REF9377.2to133485 9 ft feet379.0 Driveway423.0to164571 feet -.32390.5 Vertical Change REF9391.5to133486 9 ft feet -.29418.0 Vertical Change REF9419.0to133487 9 ft feet 2.0-3.0427.3 Cross Slope (PAR)SF49432.6to $120 $5,8831418229ft feet 1.13430.5 Vertical Change REF9431.5to133488 9 ft feet 2.0-3.0435.7 Cross Slope (PAR)SF146451.5to $120 $17,5381418239ft feet .75442.0 Vertical Change REF9443.0to133489 9 ft feet 3.44451.1 Vertical Change REF9452.1to133490 9 ft feet 2.0-3.0454.3 Cross Slope (PAR)SF46459.3to $120 $5,5501418249ft feet .47460.3 Vertical Change LF9461.3to $75 $6941334919ft feet 2.0-3.0466.1 Cross Slope (PAR)SF27469.0to $120 $3,2191418259ft feet 2.0-3.0480.3 Cross Slope (PAR)SF106491.8to $120 $12,7651418269ft feet491.8 Driveway543.0to164572 feet -.27500.8 Vertical Change REF9501.8to133492 9 ft feet .33511.3 Vertical Change REF9512.3to133493 9 ft feet 3.0-4.0543.5 Cross Slope (PAR)SF14545.0to $120 $1,6651418279ft feet 3.11544.9 Vertical Change REF9545.9to133494 9 ft feet 2.0-3.0545.2 Cross Slope (PAR)SF86554.5to $120 $10,3231418289ft feet 4.0-5.0554.5 Cross Slope (PAR)SF66561.6to $120 $7,8811418299ft feet 2.0-3.0561.6 Cross Slope (PAR)SF316595.8to $120 $37,9621418309ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 789 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 27TH ST Street Side 2200 E 27TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911211513 Run ID E 27Th St 79.5 ID Sidewalk Width Priority feet .48562.3 Vertical Change REF9563.3to133495 9 ft feet 2.0-3.0601.8 Cross Slope (PAR)SF59608.2to $120 $7,1041418319ft feet 4.0-5.0608.2 Cross Slope (PAR)SF71615.9to $120 $8,5471418329ft feet 2.0-3.0615.9 Cross Slope (PAR)SF310649.4to $120 $37,1851418339ft feet 4.0-5.0650.2 Cross Slope (PAR)SF234675.5to $120 $28,0831418349ft feet 2.0-3.0675.5 Cross Slope (PAR)SF209698.1to $120 $25,0861418359ft feet .78679.7 Vertical Change REF9680.7to133497 9 ft feet 4.0-5.0698.1 Cross Slope (PAR)SF38702.2to $120 $4,5511418369ft feet 2.0-3.0702.7 Cross Slope (PAR)SF181722.3to $120 $21,7561418379ft feet .81703.2 Vertical Change REF9704.2to133498 9 ft feet 3.14714.4 Vertical Change REF9715.4to133499 9 ft feet 4.0-5.0722.3 Cross Slope (PAR)SF64729.2to $120 $7,6591418389ft feet .37730.7 Vertical Change LF9731.7to $75 $6941335009ft feet 2.0-3.0734.1 Cross Slope (PAR)SF33737.7to $120 $3,9961418399ft feet .27736.4 Vertical Change REF9737.4to133501 9 ft feet 6.0-7.0739.8 Cross Slope (PAR)SF16741.5to $120 $1,8871418409ft feet 3.0-4.0743.7 Cross Slope (PAR)SF15745.3to $120 $1,7761418419ft feet 3.0-4.0748.1 Cross Slope (PAR)SF84757.2to $120 $10,1011418429ft feet 2.0-3.0758.6 Cross Slope (PAR)SF230783.5to $120 $27,6391418439ft feet 4.0-5.0783.5 Cross Slope (PAR)SF43788.1to $120 $5,1061418449ft feet 2.0-3.0788.3 Cross Slope (PAR)SF42792.8to $120 $4,9951418459ft $581,436.50TOTAL COST FOR:E 27TH STSside of Starting at:2200 E 27TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 790 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 27TH ST Street Side 2375 E 27TH ST Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1911211647 Run ID E 27Th St 73 ID Sidewalk Width Priority feet 2.0-3.00.5 Cross Slope (PAR)SF374.2to $120 $4,44014148110ft feet 4.0-5.04.2 Cross Slope (PAR)SF6610.8to $120 $7,92014148210ft feet 3.0-4.013.4 Cross Slope (PAR)SF14027.4to $120 $16,80014148310ft feet 2.0-3.027.4 Cross Slope (PAR)SF21148.5to $120 $25,32014148410ft feet 2.0-3.050.8 Cross Slope (PAR)SF2152.9to $120 $2,52014148510ft feet52.9 Driveway77.9to164541 feet 5.0-6.078.0 Cross Slope (Driveway)SF4882.8to $40 $1,92014148610ft feet 3.0-4.083.1 Cross Slope (PAR)SF3186.2to $120 $3,72014148710ft feet 5.0-6.086.2 Cross Slope (PAR)SF3489.6to $120 $4,08014148810ft feet 3.0-4.089.6 Cross Slope (PAR)SF4594.1to $120 $5,40014148910ft feet 5.0-6.094.1 Cross Slope (PAR)SF156109.7to $120 $18,72014149010ft feet 3.0-4.0109.9 Cross Slope (PAR)SF101120.0to $120 $12,12014149110ft feet 2.0-3.0120.0 Cross Slope (PAR)SF407160.7to $120 $48,84014149210ft feet162.3 Driveway194.4to164542 feet 4.0-5.0194.7 Cross Slope (PAR)SF25197.2to $120 $3,00014149310ft feet 2.0-3.0197.2 Cross Slope (PAR)SF292226.4to $120 $35,04014149410ft feet227.1 Driveway252.6to164543 feet 5.0-6.0253.2 Cross Slope (Driveway)SF22255.4to $40 $88014149510ft feet 3.0-4.0256.4 Cross Slope (PAR)SF184274.8to $120 $22,08014149610ft feet 2.0-3.0274.8 Cross Slope (PAR)SF10275.8to $120 $1,20014149710ft feet 2.0-3.0279.4 Cross Slope (PAR)SF15280.9to $120 $1,80014149810ft feet282.3 Driveway314.6to164544 feet .26282.8 Vertical Change REF10283.8to133384 10 ft feet -.43295.6 Vertical Change REF10296.6to133385 10 ft feet 4.0-5.0314.8 Cross Slope (Driveway)SF105325.3to $40 $4,20014149910ft feet 6.0-7.0327.3 Cross Slope (PAR)SF19329.2to $120 $2,28014150010ft feet 5.0-6.0329.6 Cross Slope (PAR)SF28332.4to $120 $3,36014150110ft feet 3.0-4.0333.2 Cross Slope (PAR)SF237356.9to $120 $28,44014150210ft feet 2.0-3.0356.9 Cross Slope (PAR)SF173374.2to $120 $20,76014150310ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 791 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 27TH ST Street Side 2375 E 27TH ST Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1911211647 Run ID E 27Th St 73 ID Sidewalk Width Priority feet 2.0-3.0376.8 Cross Slope (PAR)SF30379.8to $120 $3,60014150410ft feet 3.0-4.0382.8 Cross Slope (PAR)SF86391.4to $120 $10,32014150510ft feet 2.9384.5 Vertical Change REF10385.5to133386 10 ft feet 2.0-3.0391.4 Cross Slope (PAR)SF351426.5to $120 $42,12014150610ft feet 3.0-4.0429.0 Cross Slope (PAR)SF71436.1to $120 $8,52014150710ft feet 3.0-4.0438.9 Cross Slope (PAR)SF80446.9to $120 $9,60014150810ft feet 2.0-3.0446.9 Cross Slope (PAR)SF162463.1to $120 $19,44014150910ft feet 2.0-3.0466.0 Cross Slope (PAR)SF68472.8to $120 $8,16014151010ft feet473.3 Driveway494.6to164545 feet .3492.0 Vertical Change REF10493.0to133387 10 ft feet 3.0-4.0495.7 Cross Slope (PAR)SF34499.1to $120 $4,08014151110ft feet 3.0-4.0501.5 Cross Slope (PAR)SF211522.6to $120 $25,32014151210ft feet522.8 Driveway549.1to164546 feet -.28535.8 Vertical Change REF10536.8to133388 10 ft feet 4.0-5.0549.6 Cross Slope (PAR)SF51554.7to $120 $6,12014151310ft feet 2.0-3.0554.7 Cross Slope (PAR)SF338588.5to $120 $40,56014151410ft feet 3.0-4.0590.7 Cross Slope (PAR)SF14592.1to $120 $1,68014151510ft feet 2.0-3.0592.1 Cross Slope (PAR)SF329625.0to $120 $39,48014151610ft feet 3.0-4.0628.2 Cross Slope (PAR)SF111639.3to $120 $13,32014151710ft feet -.36629.0 Vertical Change REF10630.0to133390 10 ft feet -.36634.5 Vertical Change REF10635.5to133391 10 ft feet 5.0-6.0639.8 Cross Slope (PAR)SF40643.8to $120 $4,80014151810ft feet 3.0-4.0645.6 Cross Slope (PAR)SF126658.2to $120 $15,12014151910ft feet 2.0-3.0658.2 Cross Slope (PAR)SF51663.3to $120 $6,12014152010ft $533,200.00TOTAL COST FOR:E 27TH STNside of Starting at:2375 E 27TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 792 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 27TH ST Street Side 2443 E 27TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911221147 Run ID E 27Th St 55.5 ID Sidewalk Width Priority feet 3.0-4.01.2 Cross Slope (PAR)SF223.5to $120 $2,62214251410ft feet 2.0-3.03.5 Cross Slope (PAR)SF6510.3to $120 $7,75214251510ft feet 4.0-5.010.3 Cross Slope (PAR)SF12123.0to $120 $14,47814251610ft feet 2.0-3.023.0 Cross Slope (PAR)SF2325.4to $120 $2,73614251710ft feet25.4 Driveway65.1to164660 feet 3.0-4.065.1 Cross Slope (Driveway)SF33099.8to $40 $13,18614251810ft feet .3382.0 Vertical Change REF1083.0to133753 10 ft feet 3.0-4.0102.6 Cross Slope (PAR)SF61109.0to $120 $7,29614251910ft feet 5.0-6.0109.3 Cross Slope (PAR)SF53114.9to $120 $6,38414252010ft feet 6.0-7.0115.3 Cross Slope (PAR)SF10116.3to $120 $1,14014252110ft feet .29116.3 Vertical Change REF10117.3to133754 10 ft feet 5.0-6.0116.3 Cross Slope (PAR)SF28119.2to $120 $3,30614252210ft feet 3.0-4.0119.2 Cross Slope (PAR)SF19121.2to $120 $2,28014252310ft feet 4.0-5.0125.3 Cross Slope (PAR)SF238150.3to $120 $28,50014252410ft feet 2.0-3.0150.3 Cross Slope (PAR)SF69157.6to $120 $8,32214252510ft feet 4.0-5.0157.6 Cross Slope (PAR)SF202178.9to $120 $24,28214252610ft feet -.41172.2 Vertical Change REF10173.2to133755 10 ft $122,284.00TOTAL COST FOR:E 27TH STNside of Starting at:2443 E 27TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 793 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 27TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1911211638 Run ID E 27Th St 53 ID Sidewalk Width Priority feet 3.0-4.00.8 Cross Slope (PAR)SF947.3to $120 $11,31014152115ft feet 2.0-3.07.3 Cross Slope (PAR)SF208.7to $120 $2,43614152215ft feet 3.0-4.011.1 Cross Slope (PAR)SF12519.7to $120 $14,96414152315ft feet 2.0-3.025.3 Cross Slope (PAR)SF3627.8to $120 $4,35014152415ft feet 2.0-3.030.7 Cross Slope (PAR)SF4533.8to $120 $5,39414152515ft feet 2.0-3.036.3 Cross Slope (PAR)SF5139.8to $120 $6,09014152615ft feet 2.0-3.050.3 Cross Slope (PAR)SF37175.9to $120 $44,54414152715ft feet .2666.1 Vertical Change LF1567.1to $75 $1,08813339215ft feet 4.0-5.075.9 Cross Slope (PAR)SF13585.2to $120 $16,18214152815ft feet -.3981.7 Vertical Change REF1582.7to133393 15 ft feet 6.0-7.086.0 Cross Slope (PAR)SF1987.3to $120 $2,26214152915ft feet 5.0-6.087.3 Cross Slope (PAR)SF13896.8to $120 $16,53014153015ft feet -.2692.5 Vertical Change REF1593.5to133395 15 ft feet 3.0-4.096.8 Cross Slope (PAR)SF318118.7to $120 $38,10614153115ft $163,255.50TOTAL COST FOR:E 27TH STNside of Starting at:S SANTA FE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 794 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 27TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221119 Run ID E 27Th St 49.5 ID Sidewalk Width Priority feet 2.0-3.02.2 Cross Slope (PAR)SF8910.9to $120 $10,70114259010ft feet 3.0-4.013.2 Cross Slope (PAR)SF2215.3to $120 $2,58314259110ft feet 2.0-3.015.3 Cross Slope (PAR)SF41355.6to $120 $49,56914259210ft feet 2.0-3.060.8 Cross Slope (PAR)SF3063.7to $120 $3,56714259310ft feet 4.0-5.063.7 Cross Slope (PAR)SF2966.5to $120 $3,44414259410ft feet 2.0-3.066.5 Cross Slope (PAR)SF3369.7to $120 $3,93614259510ft feet 4.0-5.070.3 Cross Slope (PAR)SF3173.3to $120 $3,69014259610ft feet 2.0-3.073.8 Cross Slope (PAR)SF22795.9to $120 $27,18314259710ft feet 4.0-5.096.7 Cross Slope (PAR)SF52101.8to $120 $6,27314259810ft feet 2.0-3.0101.8 Cross Slope (PAR)SF68108.4to $120 $8,11814259910ft feet 5.0-6.0111.5 Cross Slope (PAR)SF26114.0to $120 $3,07514260010ft feet 3.0-4.0114.0 Cross Slope (PAR)SF13115.3to $120 $1,59914260110ft feet 2.0-3.0115.3 Cross Slope (PAR)SF21117.3to $120 $2,46014260210ft feet121.3 Driveway131.9to164675 feet .26122.2 Vertical Change REF10123.2to133784 10 ft feet132.4 Driveway136.4to164676 feet 4.0-5.0136.8 Cross Slope (PAR)SF117148.2to $120 $14,02214260310ft feet148.2 Driveway173.1to164677 feet 3.0-4.0174.0 Cross Slope (PAR)SF285201.8to $120 $34,19414260410ft feet 2.0-3.0202.8 Cross Slope (PAR)SF273229.4to $120 $32,71814260510ft feet .45203.0 Vertical Change REF10204.0to133785 10 ft feet 4.0-5.0229.4 Cross Slope (PAR)SF10230.4to $120 $1,23014260610ft feet231.8 Driveway258.5to164678 feet -.29248.2 Vertical Change REF10249.2to133786 10 ft feet 3.0-4.0263.4 Cross Slope (PAR)SF92272.4to $120 $11,07014260710ft feet -.31267.2 Vertical Change REF10268.2to133787 10 ft feet .31271.6 Vertical Change REF10272.6to133788 10 ft feet 2.0-3.0272.4 Cross Slope (PAR)SF89281.1to $120 $10,70114260810ft feet 4.0-5.0281.5 Cross Slope (PAR)SF54286.8to $120 $6,51914260910ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 795 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 27TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221119 Run ID E 27Th St 49.5 ID Sidewalk Width Priority feet287.6 Driveway306.7to164679 feet -.29305.9 Vertical Change REF10306.9to133790 10 ft feet 2.0-3.0316.8 Cross Slope (PAR)SF36320.3to $120 $4,30514261010ft feet321.3 Driveway366.7to164680 feet .27366.2 Vertical Change REF10367.2to133791 10 ft feet 2.0-3.0367.5 Cross Slope (PAR)SF190386.0to $120 $22,75514261110ft feet -.27383.7 Vertical Change REF10384.7to133792 10 ft feet 4.0-5.0387.4 Cross Slope (PAR)SF165403.5to $120 $19,80314261210ft feet -.37400.6 Vertical Change REF10401.6to133793 10 ft feet 2.0-3.0404.1 Cross Slope (PAR)SF89412.8to $120 $10,70114261310ft feet 4.0-5.0412.8 Cross Slope (PAR)SF160428.4to $120 $19,18814261410ft feet428.4 Driveway449.9to164681 feet -.32436.0 Vertical Change REF10437.0to133794 10 ft feet -.31449.4 Vertical Change REF10450.4to133795 10 ft feet 3.0-4.0451.5 Cross Slope (PAR)SF39455.3to $120 $4,67414261510ft feet 2.0-3.0455.7 Cross Slope (PAR)SF33458.9to $120 $3,93614261610ft feet458.9 Driveway518.5to164682 feet 2.0-3.0519.3 Cross Slope (PAR)SF98528.9to $120 $11,80814261710ft feet 2.0-3.0531.3 Cross Slope (PAR)SF152546.1to $120 $18,20414261810ft feet 3.0-4.0549.7 Cross Slope (PAR)SF12550.9to $120 $1,47614261910ft feet 4.0-5.0553.5 Cross Slope (PAR)SF16555.1to $120 $1,96814262010ft feet556.5 Driveway580.8to164683 feet .38569.0 Vertical Change REF10570.0to133796 10 ft feet -.26580.0 Vertical Change REF10581.0to133797 10 ft $355,470.00TOTAL COST FOR:E 27TH STSside of Starting at:S SANTA FE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 796 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E E 27TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221137 Run ID E 27Th St 72.75 ID Sidewalk Width Priority feet 2.0-3.012.8 Cross Slope (PAR)SF30945.3to $120 $37,05014253510ft feet .2630.9 Vertical Change REF1031.9to133759 10 ft feet 4.0-5.045.8 Cross Slope (PAR)SF4450.4to $120 $5,24414253610ft feet 3.0-4.052.6 Cross Slope (PAR)SF11865.0to $120 $14,13614253710ft feet 2.0-3.065.0 Cross Slope (PAR)SF20086.1to $120 $24,05414253810ft feet86.1 Driveway111.8to164664 feet 3.0-4.0112.6 Cross Slope (PAR)SF41116.9to $120 $4,90214253910ft feet 2.0-3.0116.9 Cross Slope (PAR)SF787199.7to $120 $94,39214254010ft feet 4.0-5.0199.8 Cross Slope (PAR)SF216222.5to $120 $25,87814254110ft feet 3.09204.0 Vertical Change REF10205.0to133760 10 ft feet 2.0-3.0222.8 Cross Slope (PAR)SF45227.5to $120 $5,35814254210ft feet227.6 Driveway250.6to164665 feet 2.0-3.0250.6 Cross Slope (Driveway)SF121263.3to $40 $4,82614254310ft feet 2.0-3.0268.5 Cross Slope (PAR)SF138283.0to $120 $16,53014254410ft feet 2.0-3.0287.3 Cross Slope (PAR)SF45292.0to $120 $5,35814254510ft feet 4.0-5.0292.0 Cross Slope (PAR)SF621357.4to $120 $74,55614254610ft feet .44317.1 Vertical Change REF10318.1to133761 10 ft feet 2.0-3.0357.4 Cross Slope (PAR)SF182376.6to $120 $21,88814254710ft feet .35375.9 Vertical Change REF10376.9to133762 10 ft feet 4.0-5.0376.6 Cross Slope (PAR)SF22378.9to $120 $2,62214254810ft feet 3.0-4.0381.2 Cross Slope (PAR)SF13382.6to $120 $1,59614254910ft feet 3.0-4.0388.6 Cross Slope (PAR)SF111400.3to $120 $13,33814255010ft feet 2.0-3.0408.2 Cross Slope (PAR)SF48413.2to $120 $5,70014255110ft feet 4.0-5.0413.2 Cross Slope (PAR)SF165430.6to $120 $19,83614255210ft feet 2.0-3.0430.6 Cross Slope (PAR)SF102441.3to $120 $12,19814255310ft feet 2.0-3.0444.2 Cross Slope (PAR)SF24446.7to $120 $2,85014255410ft feet 2.0-3.0449.2 Cross Slope (PAR)SF13450.6to $120 $1,59614255510ft feet 2.0-3.0453.0 Cross Slope (PAR)SF36456.8to $120 $4,33214255610ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 797 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E E 27TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221137 Run ID E 27Th St 72.75 ID Sidewalk Width Priority feet 4.0-5.0457.4 Cross Slope (PAR)SF156473.8to $120 $18,69614255710ft feet 5.0-6.0466.2 Running Slope REF10467.3to166424 10 ft feet473.8 Driveway501.5to164666 feet 3.0-4.0502.6 Cross Slope (PAR)SF54508.3to $120 $6,49814255810ft feet .42504.1 Vertical Change REF10505.1to133763 10 ft feet 2.0-3.0508.5 Cross Slope (PAR)SF70515.9to $120 $8,43614255910ft feet 4.0-5.0516.6 Cross Slope (PAR)SF125529.8to $120 $15,04814256010ft feet 2.0-3.0529.8 Cross Slope (PAR)SF214552.3to $120 $25,65014256110ft feet 4.0-5.0553.0 Cross Slope (PAR)SF281582.6to $120 $33,74414256210ft feet 2.86558.0 Vertical Change REF10559.0to133764 10 ft feet586.4 Continuous Width SF10587.4to $120 $1,14016679610ft feet 3.0-4.0588.4 Cross Slope (PAR)SF118600.8to $120 $14,13614256310ft feet .3598.7 Vertical Change REF10599.7to133766 10 ft feet601.1 Continuous Width REF10602.1to166868 10 ft feet 4.0-5.0604.1 Cross Slope (PAR)SF37608.0to $120 $4,44614256410ft feet608.0 Driveway652.6to164667 feet 4.0-5.0652.6 Cross Slope (Driveway)SF334687.8to $40 $13,37614256510ft feet658.0 Continuous Width REF10659.0to166798 10 ft feet -.28663.4 Vertical Change LF10664.4to $75 $71313376710ft feet669.9 Continuous Width SF10670.9to $120 $1,14016679710ft feet 2.12674.9 Vertical Change REF10675.9to133768 10 ft feet 2.0-3.0687.8 Cross Slope (PAR)SF113699.7to $120 $13,56614256610ft feet 3.0-4.0702.3 Cross Slope (PAR)SF88711.6to $120 $10,60214256710ft feet 2.0-3.0711.6 Cross Slope (PAR)SF75719.5to $120 $9,00614256810ft feet -.43718.7 Vertical Change REF10719.7to133769 10 ft feet 5.0-6.0720.4 Cross Slope (PAR)SF13721.8to $120 $1,59614256910ft feet .73721.0 Vertical Change REF10722.0to133770 10 ft feet 4.0-5.0724.3 Cross Slope (PAR)SF84733.1to $120 $10,03214257010ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 798 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E E 27TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221137 Run ID E 27Th St 72.75 ID Sidewalk Width Priority feet 2.0-3.0741.3 Cross Slope (PAR)SF61747.7to $120 $7,29614257110ft feet 4.0-5.0753.0 Cross Slope (PAR)SF10754.0to $120 $1,14014257210ft feet 4.0-5.0756.1 Cross Slope (PAR)SF48761.1to $120 $5,70014257310ft feet 2.0-3.0766.2 Cross Slope (PAR)SF91775.8to $120 $10,94414257410ft feet 3.0-4.0779.3 Cross Slope (PAR)SF85788.2to $120 $10,14614257510ft feet 2.0-3.0788.2 Cross Slope (PAR)SF320821.9to $120 $38,41814257610ft feet 4.0-5.0821.9 Cross Slope (PAR)SF78830.1to $120 $9,34814257710ft feet 2.0-3.0830.1 Cross Slope (PAR)SF99840.5to $120 $11,85614257810ft feet840.5 Driveway867.5to164668 feet 4.0-5.0867.8 Cross Slope (Driveway)SF174886.1to $40 $6,95414257910ft feet -.27871.3 Vertical Change REF10872.3to133771 10 ft feet .28878.0 Vertical Change REF10879.0to133772 10 ft feet 2.0-3.0886.1 Cross Slope (PAR)SF333921.2to $120 $40,01414258010ft feet -.5906.3 Vertical Change REF10907.3to133773 10 ft feet 4.0-5.0921.2 Cross Slope (PAR)SF320954.9to $120 $38,41814258110ft feet -.35923.9 Vertical Change REF10924.9to133774 10 ft feet957.3 Driveway1035.4to164669 feet -.27968.7 Vertical Change REF10969.7to133775 10 ft feet 4.0-5.01035.4 Cross Slope (Driveway)SF671042.5to $40 $2,69814258210ft feet 4.0-5.01047.7 Cross Slope (PAR)SF601054.0to $120 $7,18214258310ft feet 2.0-3.01054.0 Cross Slope (PAR)SF1021064.7to $120 $12,19814258410ft feet .261056.4 Vertical Change REF101057.4to133776 10 ft feet1064.7 Cold Patch 351068.4to140266 10 ft feet1068.9 Driveway1089.8to164670 feet .331088.3 Vertical Change REF101089.3to133777 10 ft feet .921090.0 Vertical Change REF101091.0to133778 10 ft feet 4.0-5.01092.8 Cross Slope (PAR)SF1421107.7to $120 $16,98614258510ft feet1107.8 Driveway1189.1to164671 feet -.471136.0 Vertical Change REF101137.0to133779 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 799 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes E E 27TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name TRAIN CROSSING End Street Name 1911221137 Run ID E 27Th St 72.75 ID Sidewalk Width Priority feet .271148.7 Vertical Change REF101149.7to133780 10 ft feet .281179.4 Vertical Change REF101180.4to133781 10 ft feet 3.0-4.01189.7 Cross Slope (PAR)SF331193.2to $120 $3,99014258610ft feet 5.0-6.01193.2 Cross Slope (PAR)SF221195.5to $120 $2,62214258710ft feet1195.5 Driveway1214.7to164672 feet .451206.3 Vertical Change REF101207.3to133782 10 ft feet -.521215.5 Vertical Change REF101216.5to133783 10 ft feet 4.0-5.01216.3 Cross Slope (PAR)SF1001226.8to $120 $11,97014258810ft feet1226.8 Driveway1242.9to164673 feet1226.8 Driveway1246.1to164674 feet 3.0-4.01244.8 Cross Slope (Driveway)SF101245.9to $40 $41814258910ft $824,362.50TOTAL COST FOR:E 27TH STEside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 800 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 27TH ST Street Side TRAIN CROSSING Survey Street Name Starting Street Name 2455 E 27TH ST End Street Name 1911221142 Run ID E 27Th St 51 ID Sidewalk Width Priority feet 2.0-3.05.2 Cross Slope (PAR)SF18624.8to $120 $22,34414252710ft feet -.2812.9 Vertical Change REF1013.9to133756 10 ft feet 2.0-3.027.8 Cross Slope (PAR)SF16044.6to $120 $19,15214252810ft feet .2940.2 Vertical Change REF941.2to133757 10 ft feet44.6 Driveway81.9to164661 feet 2.0-3.081.9 Cross Slope (Driveway)SF5687.8to $40 $2,24214252910ft feet 4.0-5.087.8 Cross Slope (PAR)SF8997.2to $120 $10,71614253010ft feet 2.0-3.097.8 Cross Slope (PAR)SF158114.4to $120 $18,92414253110ft feet114.4 Driveway144.9to164662 feet 3.0-4.0145.5 Cross Slope (PAR)SF105156.6to $120 $12,65414253210ft feet 1.43156.3 Vertical Change REF10157.3to133758 10 ft feet 3.0-4.0159.0 Cross Slope (PAR)SF18160.9to $120 $2,16614253310ft feet 2.0-3.0161.7 Cross Slope (PAR)SF62168.2to $120 $7,41014253410ft feet168.3 Driveway214.5to164663 $95,608.00TOTAL COST FOR:E 27TH STNside of Starting at:TRAIN CROSSING October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 801 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 28TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912021443 Run ID E 28Th St 55.5 ID Sidewalk Width Priority feet -.321.9 Vertical Change LF92.9to $75 $6941383829ft feet 2.0-3.08.9 Cross Slope (PAR)SF10119.8to $120 $12,0991589289ft feet20.2 Driveway48.0to166016 feet -.2636.8 Vertical Change REF937.8to138383 9 ft feet 2.0-3.069.5 Cross Slope (PAR)SF1370.9to $120 $1,5541589299ft feet 2.0-3.073.9 Cross Slope (PAR)SF4578.8to $120 $5,4391589309ft feet 2.0-3.0104.2 Cross Slope (PAR)SF13105.6to $120 $1,5541589319ft feet 2.0-3.0109.8 Cross Slope (PAR)SF128123.6to $120 $15,3181589329ft feet124.6 Driveway145.1to166017 feet -.27133.4 Vertical Change REF9134.4to138384 9 ft feet 2.0-3.0160.7 Cross Slope (PAR)SF14162.2to $120 $1,6651589339ft feet 2.0-3.0166.8 Cross Slope (PAR)SF46171.8to $120 $5,5501589349ft feet -.31170.8 Vertical Change REF9171.8to138385 9 ft feet 2.0-3.0177.8 Cross Slope (PAR)SF62184.5to $120 $7,4371589359ft feet 3.0-4.0188.7 Cross Slope (PAR)SF17190.5to $120 $1,9981589369ft feet190.5 Driveway226.8to166018 feet -.48202.8 Vertical Change REF9203.8to138386 9 ft feet 3.0-4.0226.8 Cross Slope (Driveway)SF189247.2to $40 $7,5481589379ft feet -.36244.0 Vertical Change REF9245.0to138387 9 ft feet 2.0-3.0247.4 Cross Slope (PAR)SF91257.2to $120 $10,8781589389ft feet259.0 Driveway288.2to166019 feet -.41259.2 Vertical Change REF9260.2to138388 9 ft feet -.35287.5 Vertical Change REF9288.5to138389 9 ft feet 2.0-3.0288.6 Cross Slope (PAR)SF57294.8to $120 $6,8821589399ft feet 2.0-3.0298.0 Cross Slope (PAR)SF13299.4to $120 $1,5541589409ft feet 2.0-3.0308.4 Cross Slope (PAR)SF13309.8to $120 $1,5541589419ft feet 2.0-3.0312.3 Cross Slope (PAR)SF111324.3to $120 $13,3201589429ft feet325.3 Driveway360.8to166020 feet 2.0-3.0365.1 Cross Slope (PAR)SF9366.1to $120 $1,1101589439ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 802 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 28TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912021443 Run ID E 28Th St 55.5 ID Sidewalk Width Priority feet 2.0-3.0371.3 Cross Slope (PAR)SF41375.7to $120 $4,8841589449ft feet376.8 Driveway407.3to166021 feet .46377.5 Vertical Change REF9378.5to138390 9 ft feet .27397.7 Vertical Change REF9398.7to138391 9 ft feet 2.0-3.0408.8 Cross Slope (PAR)SF97419.3to $120 $11,6551589459ft feet -.48416.5 Vertical Change REF9417.5to138392 9 ft feet 4.0-5.0422.2 Cross Slope (PAR)SF185442.2to $120 $22,2001589469ft feet 2.0-3.0442.5 Cross Slope (PAR)SF181462.1to $120 $21,7561589479ft feet .28455.7 Vertical Change REF9456.7to138393 9 ft feet 4.0-5.0462.9 Cross Slope (PAR)SF55468.8to $120 $6,5491589489ft feet 2.0-3.0469.7 Cross Slope (PAR)SF91479.5to $120 $10,8781589499ft feet 4.0-5.0479.8 Cross Slope (PAR)SF32483.3to $120 $3,8851589509ft feet 2.0-3.0483.3 Cross Slope (PAR)SF25486.0to $120 $2,9971589519ft feet 2.0-3.0489.3 Cross Slope (PAR)SF76497.5to $120 $9,1021589529ft feet 3.0-4.0501.3 Cross Slope (PAR)SF12502.6to $120 $1,4431589539ft feet503.0 Driveway535.1to166022 feet .27510.3 Vertical Change REF9511.3to138394 9 ft feet 2.0-3.0535.2 Cross Slope (Driveway)SF100546.0to $40 $3,9961589549ft feet .7544.4 Vertical Change REF9545.4to138395 9 ft feet .36549.0 Vertical Change LF9550.0to $75 $6941383969ft feet 2.0-3.0550.7 Cross Slope (PAR)SF76558.9to $120 $9,1021589559ft feet 2.0-3.0564.8 Cross Slope (PAR)SF29567.9to $120 $3,4411589569ft feet 2.0-3.0570.5 Cross Slope (PAR)SF15572.1to $120 $1,7761589579ft feet576.0 Cold Patch 241602.0to140566 9 ft feet .7576.7 Vertical Change SF9577.7to $75 $6941383979ft feet -.39600.4 Vertical Change LF9601.4to $75 $6941383989ft feet 3.0-4.0602.0 Cross Slope (PAR)SF13603.4to $120 $1,5541589589ft feet 2.0-3.0603.4 Cross Slope (PAR)SF162620.9to $120 $19,4251589599ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 803 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 28TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912021443 Run ID E 28Th St 55.5 ID Sidewalk Width Priority feet 4.0-5.0621.2 Cross Slope (PAR)SF243647.5to $120 $29,1931589609ft feet .3642.5 Vertical Change REF9643.5to138399 9 ft feet647.5 Driveway680.3to166023 feet 3.0-4.0681.1 Cross Slope (PAR)SF48686.3to $120 $5,7721589619ft feet .29690.2 Vertical Change REF9691.2to138400 9 ft feet 3.0-4.0690.3 Cross Slope (PAR)SF19692.3to $120 $2,2201589629ft feet 2.0-3.0692.3 Cross Slope (PAR)SF145708.0to $120 $17,4271589639ft feet .29703.1 Vertical Change REF9704.1to138401 9 ft feet 4.0-5.0708.0 Cross Slope (PAR)SF30711.2to $120 $3,5521589649ft feet 2.0-3.0711.2 Cross Slope (PAR)SF10712.3to $120 $1,2211589659ft feet 3.0-4.0714.6 Cross Slope (PAR)SF265743.3to $120 $31,8571589669ft feet744.5 Driveway783.4to166024 feet 2.0-3.0784.8 Cross Slope (PAR)SF63791.6to $120 $7,5481589679ft feet 4.0-5.0791.6 Cross Slope (PAR)SF34795.3to $120 $4,1071589689ft feet 2.0-3.0795.6 Cross Slope (PAR)SF43800.3to $120 $5,2171589699ft feet 2.0-3.0802.7 Cross Slope (PAR)SF765885.4to $120 $91,7971589709ft feet 4.0-5.0885.4 Cross Slope (PAR)SF95895.7to $120 $11,4331589719ft feet 2.0-3.0897.0 Cross Slope (PAR)SF21899.3to $120 $2,5531589729ft feet 2.0-3.0901.7 Cross Slope (PAR)SF51907.2to $120 $6,1051589739ft feet 3.0-4.0911.9 Cross Slope (PAR)SF33915.5to $120 $3,9961589749ft feet .32913.1 Vertical Change REF9914.1to138402 9 ft feet 2.0-3.0915.5 Cross Slope (PAR)SF293947.2to $120 $35,1871589759ft feet947.2 Driveway985.7to166025 feet 3.0-4.0986.1 Cross Slope (Driveway)SF2601014.2to $40 $10,3971589769ft feet 2.0-3.01014.2 Cross Slope (PAR)SF151015.8to $120 $1,7761589779ft feet 2.0-3.01026.5 Cross Slope (PAR)SF1511042.8to $120 $18,0931589789ft feet 3.0-4.01047.2 Cross Slope (PAR)SF421051.7to $120 $4,9951589799ft feet 5.0-6.01052.8 Cross Slope (PAR)SF651059.8to $120 $7,7701589809ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 804 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 28TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912021443 Run ID E 28Th St 55.5 ID Sidewalk Width Priority feet 3.0-4.01059.8 Cross Slope (PAR)SF1241073.2to $120 $14,8741589819ft feet 2.0-3.01074.0 Cross Slope (PAR)SF1091085.8to $120 $13,0981589829ft feet .261075.4 Vertical Change REF91076.4to138403 9 ft feet .821079.1 Vertical Change REF91080.1to138404 9 ft feet .411081.6 Vertical Change REF91082.6to138405 9 ft feet 4.0-5.01086.6 Cross Slope (PAR)SF481091.8to $120 $5,7721589839ft feet 2.0-3.01091.8 Cross Slope (PAR)SF431096.4to $120 $5,1061589849ft feet 4.0-5.01097.9 Cross Slope (PAR)SF2101120.6to $120 $25,1971589859ft feet .351117.6 Vertical Change REF91118.6to138406 9 ft feet 4.0-5.01123.1 Cross Slope (PAR)SF3921165.5to $120 $47,0641589869ft feet 2.0-3.01165.7 Cross Slope (PAR)SF891175.3to $120 $10,6561589879ft feet 4.0-5.01176.3 Cross Slope (PAR)SF651183.3to $120 $7,7701589889ft feet 2.0-3.01186.4 Cross Slope (PAR)SF291189.5to $120 $3,4411589899ft feet .931187.6 Vertical Change REF91188.6to138408 9 ft feet 3.0-4.01191.8 Cross Slope (PAR)SF141193.3to $120 $1,6651589909ft feet 2.0-3.01193.6 Cross Slope (PAR)SF671200.8to $120 $7,9921589919ft feet1200.8 Driveway1242.9to166026 feet 2.0-3.01243.8 Cross Slope (PAR)SF1391258.8to $120 $16,6501589929ft $694,379.00TOTAL COST FOR:E 28TH STSside of Starting at:S SANTA FE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 805 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 28TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912021334 Run ID E 28Th St 62.75 ID Sidewalk Width Priority feet 2.0-3.00.0 Cross Slope (PAR)SF586.3to $120 $6,9931591519ft feet 2.0-3.08.8 Cross Slope (PAR)SF38750.6to $120 $46,3981591529ft feet .434.3 Vertical Change REF935.3to138466 9 ft feet .3141.9 Vertical Change REF942.9to138467 9 ft feet50.6 Driveway84.8to166040 feet .369.8 Vertical Change REF970.8to138468 9 ft feet 3.0-4.085.4 Cross Slope (Driveway)SF3188.7to $40 $1,2211591539ft feet 2.0-3.089.4 Cross Slope (PAR)SF5995.8to $120 $7,1041591549ft feet 4.0-5.095.8 Cross Slope (PAR)SF100106.6to $120 $11,9881591559ft feet 2.0-3.0106.6 Cross Slope (PAR)SF80115.2to $120 $9,5461591569ft feet 4.0-5.0115.2 Cross Slope (PAR)SF526172.1to $120 $63,1591591579ft feet172.6 Driveway195.8to166041 feet .33182.4 Vertical Change REF9183.4to138469 9 ft feet 3.0-4.0195.8 Cross Slope (Driveway)SF427242.0to $40 $17,0941591589ft feet .92201.7 Vertical Change REF9202.7to138470 9 ft feet .27223.5 Vertical Change REF9224.5to138471 9 ft feet242.0 Driveway270.3to166042 feet 3.0-4.0270.3 Cross Slope (Driveway)SF145286.0to $40 $5,8091591599ft feet 2.0-3.0286.0 Cross Slope (PAR)SF17287.8to $120 $1,9981591609ft feet 2.0-3.0290.0 Cross Slope (PAR)SF216313.4to $120 $25,9741591619ft feet 3.11308.3 Vertical Change SF9309.3to $75 $6941384729ft feet 2.0-3.0315.8 Cross Slope (PAR)SF32319.3to $120 $3,8851591629ft feet319.3 Driveway346.9to166043 feet 2.0-3.0347.9 Cross Slope (PAR)SF170366.3to $120 $20,4241591639ft feet366.3 Driveway386.8to166044 feet 4.0-5.0386.8 Cross Slope (Driveway)SF59393.2to $40 $2,3681591649ft feet -.28394.8 Vertical Change LF9395.8to $75 $6941384739ft feet 5.0-6.0396.1 Cross Slope (PAR)SF37400.1to $120 $4,4401591659ft feet .37396.9 Vertical Change REF9397.9to138474 9 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 806 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 28TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912021334 Run ID E 28Th St 62.75 ID Sidewalk Width Priority feet 3.0-4.0400.3 Cross Slope (PAR)SF26403.1to $120 $3,1081591669ft feet 2.0-3.0403.3 Cross Slope (PAR)SF28406.3to $120 $3,3301591679ft feet 4.0-5.0406.9 Cross Slope (PAR)SF28409.9to $120 $3,3301591689ft feet 2.0-3.0409.9 Cross Slope (PAR)SF48415.1to $120 $5,7721591699ft feet 4.0-5.0415.1 Cross Slope (PAR)SF35418.9to $120 $4,2181591709ft feet 2.0-3.0420.7 Cross Slope (PAR)SF266449.5to $120 $31,9681591719ft feet -.4437.7 Vertical Change REF9438.7to138475 9 ft feet 4.0-5.0449.5 Cross Slope (PAR)SF45454.4to $120 $5,4391591729ft feet 2.0-3.0454.4 Cross Slope (PAR)SF27457.3to $120 $3,2191591739ft feet 4.0-5.0459.1 Cross Slope (PAR)SF49464.4to $120 $5,8831591749ft feet 2.0-3.0464.4 Cross Slope (PAR)SF97474.9to $120 $11,6551591759ft feet 4.0-5.0475.3 Cross Slope (PAR)SF45480.2to $120 $5,4391591769ft feet 2.0-3.0480.5 Cross Slope (PAR)SF53486.2to $120 $6,3271591779ft feet 4.0-5.0489.9 Cross Slope (PAR)SF84499.0to $120 $10,1011591789ft feet -.34498.0 Vertical Change REF9499.0to138476 9 ft feet 2.0-3.0512.6 Cross Slope (PAR)SF20514.8to $120 $2,4421591799ft feet 2.02519.0 Vertical Change SF9520.0to $75 $6941384779ft feet 2.0-3.0531.0 Cross Slope (PAR)SF187551.2to $120 $22,4221591809ft feet 2.0-3.0553.5 Cross Slope (PAR)SF132567.8to $120 $15,8731591819ft feet .27558.2 Vertical Change REF9559.2to138478 9 ft feet 4.0-5.0567.8 Cross Slope (PAR)SF163585.4to $120 $19,5361591829ft feet 4.0-5.0587.6 Cross Slope (PAR)SF191608.3to $120 $22,9771591839ft feet 2.0-3.0608.3 Cross Slope (PAR)SF14609.8to $120 $1,6651591849ft feet609.8 Driveway627.6to166045 feet -.46611.2 Vertical Change REF9612.2to138479 9 ft feet 2.0-3.0629.2 Cross Slope (PAR)SF19631.3to $120 $2,3311591859ft feet 3.0-4.0634.1 Cross Slope (PAR)SF82643.0to $120 $9,8791591869ft feet 2.0-3.0643.7 Cross Slope (PAR)SF23646.2to $120 $2,7751591879ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 807 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 28TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912021334 Run ID E 28Th St 62.75 ID Sidewalk Width Priority feet .33648.2 Vertical Change LF9649.2to $75 $6941384809ft feet 2.0-3.0651.5 Cross Slope (PAR)SF12652.8to $120 $1,4431591889ft feet662.8 Cold Patch 0662.8to140568 9 ft feet 2.0-3.0663.9 Cross Slope (PAR)SF23666.4to $120 $2,7751591899ft feet .26674.9 Vertical Change LF9675.9to $75 $6941384819ft feet 2.0-3.0680.3 Cross Slope (PAR)SF13681.7to $120 $1,5541591909ft feet 2.0-3.0686.2 Cross Slope (PAR)SF29689.3to $120 $3,4411591919ft feet 7.0-8.0687.4 Running Slope REF16689.1to166635 9 ft feet -.35688.5 Vertical Change REF9689.5to138482 9 ft feet690.1 Driveway710.8to166046 feet -.46717.9 Vertical Change REF9718.9to138483 9 ft feet 4.0-5.0717.9 Cross Slope (PAR)SF45722.8to $120 $5,4391591929ft feet 2.0-3.0722.8 Cross Slope (PAR)SF23725.3to $120 $2,7751591939ft feet 2.0-3.0731.6 Cross Slope (PAR)SF413776.3to $120 $49,6171591949ft feet 2.0-3.0779.8 Cross Slope (PAR)SF16781.5to $120 $1,8871591959ft feet 3.0-4.0786.6 Cross Slope (PAR)SF15788.2to $120 $1,7761591969ft feet 2.0-3.0788.2 Cross Slope (PAR)SF99798.9to $120 $11,8771591979ft feet 2.0-3.0801.1 Cross Slope (PAR)SF215824.3to $120 $25,7521591989ft feet 2.0-3.0826.6 Cross Slope (PAR)SF140841.7to $120 $16,7611591999ft feet 3.0-4.0843.8 Cross Slope (PAR)SF37847.8to $120 $4,4401592009ft feet 2.0-3.0847.8 Cross Slope (PAR)SF116860.3to $120 $13,8751592019ft feet 3.0-4.0862.8 Cross Slope (PAR)SF56868.8to $120 $6,6601592029ft feet 2.0-3.0869.0 Cross Slope (PAR)SF120882.0to $120 $14,4301592039ft feet 2.0-3.0885.8 Cross Slope (PAR)SF228910.5to $120 $27,4171592049ft feet -.31894.1 Vertical Change REF9895.1to138484 9 ft feet 2.0-3.0913.3 Cross Slope (PAR)SF72921.1to $120 $8,6581592059ft feet 2.0-3.0925.0 Cross Slope (PAR)SF343962.1to $120 $41,1811592069ft feet .26952.0 Vertical Change REF9953.0to138485 9 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 808 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 28TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912021334 Run ID E 28Th St 62.75 ID Sidewalk Width Priority feet 3.0-4.0964.7 Cross Slope (PAR)SF11965.9to $120 $1,3321592079ft feet 2.0-3.0966.4 Cross Slope (PAR)SF89976.0to $120 $10,6561592089ft feet 4.0-5.0976.0 Cross Slope (PAR)SF35979.8to $120 $4,2181592099ft feet 4.0-5.0982.1 Cross Slope (PAR)SF2491009.0to $120 $29,8591592109ft feet -.31005.0 Vertical Change REF91006.0to138486 9 ft feet 2.0-3.01009.0 Cross Slope (PAR)SF2411035.0to $120 $28,8601592119ft feet 4.0-5.01035.0 Cross Slope (PAR)SF1881055.3to $120 $22,5331592129ft feet .261038.3 Vertical Change REF91039.3to138487 9 ft feet -.431054.5 Vertical Change REF91055.5to138488 9 ft feet 2.0-3.01055.6 Cross Slope (PAR)SF111056.8to $120 $1,3321592139ft feet .361056.7 Vertical Change REF91057.7to138489 9 ft feet 2.0-3.01066.3 Cross Slope (PAR)SF581072.6to $120 $6,9931592149ft feet 4.0-5.01072.6 Cross Slope (PAR)SF431077.2to $120 $5,1061592159ft feet 2.0-3.01077.2 Cross Slope (PAR)SF2951109.1to $120 $35,4091592169ft feet -.321078.1 Vertical Change REF91079.1to138490 9 ft feet -.351095.3 Vertical Change REF91096.3to138491 9 ft feet 3.0-4.01111.6 Cross Slope (PAR)SF251114.3to $120 $2,9971592179ft feet 3.0-4.01118.3 Cross Slope (PAR)SF221120.7to $120 $2,6641592189ft feet 2.0-3.01120.7 Cross Slope (PAR)SF691128.2to $120 $8,3251592199ft feet1128.8 Driveway1145.1to166047 feet 2.0-3.01148.8 Cross Slope (PAR)SF1341163.3to $120 $16,0951592209ft feet 2.0-3.01166.0 Cross Slope (PAR)SF1041177.2to $120 $12,4321592219ft feet 2.0-3.01180.2 Cross Slope (PAR)SF151181.8to $120 $1,7761592229ft feet 2.0-3.01205.6 Cross Slope (PAR)SF271208.5to $120 $3,2191592239ft feet 2.0-3.01213.0 Cross Slope (PAR)SF301216.2to $120 $3,5521592249ft feet 2.0-3.01222.9 Cross Slope (PAR)SF131224.3to $120 $1,5541592259ft feet 2.0-3.01232.8 Cross Slope (PAR)SF191234.8to $120 $2,2201592269ft feet 2.0-3.01248.3 Cross Slope (PAR)SF101249.4to $120 $1,2211592279ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 809 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 28TH ST Street Side SIDEWALK BEGINS Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912021334 Run ID E 28Th St 62.75 ID Sidewalk Width Priority feet 2.0-3.01254.3 Cross Slope (PAR)SF131255.7to $120 $1,5541592289ft $877,223.75TOTAL COST FOR:E 28TH STNside of Starting at:SIDEWALK BEGINS October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 810 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 30TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912021414 Run ID E 30Th St 55.75 ID Sidewalk Width Priority feet 2.0-3.010.0 Cross Slope (PAR)SF2813.0to $120 $3,3301590359ft feet 2.0-3.017.1 Cross Slope (PAR)SF10027.9to $120 $11,9881590369ft feet -.327.9 Vertical Change REF928.9to138422 9 ft feet 3.0-4.030.6 Cross Slope (PAR)SF12243.8to $120 $14,6521590379ft feet 2.0-3.044.3 Cross Slope (PAR)SF6351.1to $120 $7,5481590389ft feet 2.0-3.055.1 Cross Slope (PAR)SF2057.3to $120 $2,4421590399ft feet 2.0-3.060.2 Cross Slope (PAR)SF5065.6to $120 $5,9941590409ft feet 2.0-3.068.8 Cross Slope (PAR)SF3772.8to $120 $4,4401590419ft feet -.3969.0 Vertical Change REF970.0to138423 9 ft feet 2.0-3.088.8 Cross Slope (PAR)SF106100.3to $120 $12,7651590429ft feet .2891.7 Vertical Change REF3195.0to138424 9 ft feet 2.0-3.0102.8 Cross Slope (PAR)SF38106.9to $120 $4,5511590439ft feet 8.0-9.0106.0 Running Slope REF12107.3to166634 9 ft feet 2.0-3.0112.2 Cross Slope (PAR)SF13113.6to $120 $1,5541590449ft feet 2.0-3.0117.3 Cross Slope (PAR)SF60123.8to $120 $7,2151590459ft feet124.8 Cold Patch 0124.8to140567 9 ft feet .27127.6 Vertical Change LF9128.6to $75 $6941384259ft feet .26131.4 Vertical Change LF9132.4to $75 $6941384269ft feet 2.0-3.0133.4 Cross Slope (PAR)SF13134.8to $120 $1,5541590469ft feet .59135.6 Vertical Change SF9136.6to $75 $6941384279ft feet141.3 Driveway232.5to166030 feet -.27175.4 Vertical Change REF9176.4to138428 9 ft feet .36178.3 Vertical Change REF9179.3to138429 9 ft feet -.26186.2 Vertical Change REF9187.2to138430 9 ft feet -.28191.6 Vertical Change REF9192.6to138431 9 ft feet -.29202.2 Vertical Change REF9203.2to138432 9 ft feet .29231.6 Vertical Change REF9232.6to138433 9 ft feet 3.0-4.0232.6 Cross Slope (PAR)SF11233.8to $120 $1,3321590479ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 811 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 30TH ST Street Side S SANTA FE AVE Survey Street Name Starting Street Name SIDEWALK ENDS End Street Name 1912021414 Run ID E 30Th St 55.75 ID Sidewalk Width Priority feet 2.0-3.0233.8 Cross Slope (PAR)SF447282.1to $120 $53,6131590489ft feet 2.0-3.0286.8 Cross Slope (PAR)SF77295.1to $120 $9,2131590499ft feet 4.0-5.0295.3 Cross Slope (PAR)SF21297.6to $120 $2,5531590509ft feet -.45295.8 Vertical Change REF30299.0to138434 9 ft feet298.6 Driveway385.2to166031 feet -.3304.8 Vertical Change REF9305.8to138435 9 ft feet -.38357.3 Vertical Change REF9358.3to138436 9 ft feet .3362.4 Vertical Change REF9363.4to138437 9 ft feet .3376.6 Vertical Change REF9377.6to138439 9 ft $146,825.25TOTAL COST FOR:E 30TH STSside of Starting at:S SANTA FE AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 812 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 37TH ST Street Side 2350 E 37TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1911211055 Run ID E 37Th St 53 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF868.8to $120 $10,29614226710ft feet .31.0 Vertical Change REF102.0to133659 10 ft feet 2.0-3.08.8 Cross Slope (PAR)SF4113.0to $120 $4,91414226810ft feet13.2 Driveway32.1to164618 feet 2.0-3.032.9 Cross Slope (PAR)SF11044.2to $120 $13,22114226910ft feet44.3 Driveway58.2to164619 feet 3.0-4.059.3 Cross Slope (PAR)SF2061.4to $120 $2,45714227010ft feet 2.0-3.061.4 Cross Slope (PAR)SF17579.3to $120 $20,94314227110ft feet 2.0-3.081.8 Cross Slope (PAR)SF6988.9to $120 $8,30714227210ft feet 3.0-4.091.6 Cross Slope (PAR)SF90100.8to $120 $10,76414227310ft feet 2.0-3.0101.2 Cross Slope (PAR)SF11102.3to $120 $1,28714227410ft feet 2.0-3.0106.1 Cross Slope (PAR)SF50111.2to $120 $5,96714227510ft feet 4.0-5.0111.8 Cross Slope (PAR)SF65118.5to $120 $7,83914227610ft $85,995.00TOTAL COST FOR:E 37TH STSside of Starting at:2350 E 37TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 813 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912030948 Run ID E 37Th St 96 ID Sidewalk Width Priority feet 2.0-3.016.3 Cross Slope (PAR)SF2519.8to $120 $3,0451604667ft feet 4.0-5.019.8 Cross Slope (PAR)SF7029.4to $120 $8,3521604677ft feet 2.0-3.029.4 Cross Slope (PAR)SF6738.6to $120 $8,0041604687ft feet 4.0-5.040.7 Cross Slope (PAR)SF10955.8to $120 $13,1371604697ft feet 2.0-3.055.8 Cross Slope (PAR)SF1958.4to $120 $2,2621604707ft feet 2.0-3.065.9 Cross Slope (PAR)SF6875.3to $120 $8,1781604717ft feet 2.0-3.077.5 Cross Slope (PAR)SF8989.8to $120 $10,7011604727ft feet 2.0-3.092.7 Cross Slope (PAR)SF140112.0to $120 $16,7911604737ft feet 2.0-3.0115.7 Cross Slope (PAR)SF71125.5to $120 $8,5261604747ft feet 4.0-5.0125.5 Cross Slope (PAR)SF71135.3to $120 $8,5261604757ft feet 2.0-3.0137.4 Cross Slope (PAR)SF28141.3to $120 $3,3931604767ft feet 2.0-3.0145.6 Cross Slope (PAR)SF107160.3to $120 $12,7891604777ft feet161.3 Driveway210.7to166147 feet .32201.2 Vertical Change REF7202.2to138940 7 ft feet 3.41210.2 Vertical Change REF7211.2to138941 7 ft feet 3.0-4.0210.8 Cross Slope (Driveway)SF17213.1to $40 $6671604787ft feet 2.0-3.0213.3 Cross Slope (PAR)SF14215.2to $120 $1,6531604797ft feet 4.0-5.0215.5 Cross Slope (PAR)SF9216.8to $120 $1,1311604807ft feet 3.0-4.0219.7 Cross Slope (PAR)SF15221.8to $120 $1,8271604817ft feet 2.0-3.0221.8 Cross Slope (PAR)SF104236.1to $120 $12,4411604827ft feet 4.0-5.0237.2 Cross Slope (PAR)SF25240.6to $120 $2,9581604837ft feet 2.0-3.0241.4 Cross Slope (PAR)SF26245.0to $120 $3,1321604847ft feet245.9 Continuous Width SF7246.9to $120 $8701670187ft feet250.3 Cold Patch 186275.9to140228 7 ft feet .44250.8 Vertical Change LF7251.8to $75 $5441389427ft feet -.5261.1 Vertical Change SF7262.1to $75 $5441389437ft feet276.0 Driveway302.9to166148 feet .3292.8 Vertical Change REF7293.8to138944 7 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 814 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912030948 Run ID E 37Th St 96 ID Sidewalk Width Priority feet 5.0-6.0302.9 Cross Slope (Driveway)SF32307.3to $40 $1,2761604857ft feet 3.18304.2 Vertical Change REF7305.2to138945 7 ft feet 3.0-4.0307.7 Cross Slope (PAR)SF15309.8to $120 $1,8271604867ft feet309.8 Driveway366.3to166149 feet .58325.0 Vertical Change REF7326.0to138946 7 ft feet -.33360.6 Vertical Change REF7361.6to138947 7 ft feet 2.0-3.0366.3 Cross Slope (Driveway)SF44372.3to $40 $1,7401604877ft feet 2.0-3.0376.0 Cross Slope (PAR)SF19378.6to $120 $2,2621604887ft feet 2.0-3.0381.5 Cross Slope (PAR)SF15383.6to $120 $1,8271604897ft feet 2.0-3.0386.5 Cross Slope (PAR)SF78397.3to $120 $9,3961604907ft feet 2.0-3.0409.0 Cross Slope (PAR)SF12410.7to $120 $1,4791604917ft feet411.3 Driveway437.8to166150 feet 5.0-6.0438.7 Cross Slope (PAR)SF35443.5to $120 $4,1761604927ft feet 3.0-4.0445.8 Cross Slope (PAR)SF57453.6to $120 $6,7861604937ft feet 5.0-6.0453.6 Cross Slope (PAR)SF34458.3to $120 $4,0891604947ft feet 3.0-4.0458.3 Cross Slope (PAR)SF8459.4to $120 $9571604957ft feet 2.0-3.0461.9 Cross Slope (PAR)SF21464.8to $120 $2,5231604967ft feet 3.0-4.0469.6 Cross Slope (PAR)SF9470.8to $120 $1,0441604977ft feet 3.0-4.0475.4 Cross Slope (PAR)SF26479.0to $120 $3,1321604987ft feet 3.0-4.0483.8 Cross Slope (PAR)SF9485.0to $120 $1,0441604997ft feet 2.0-3.0485.0 Cross Slope (PAR)SF20487.8to $120 $2,4361605007ft feet488.7 Driveway518.0to166151 feet -.28489.3 Vertical Change REF7490.3to138948 7 ft feet 3.0-4.0519.9 Cross Slope (PAR)SF33524.5to $120 $4,0021605017ft feet 5.0-6.0524.9 Cross Slope (PAR)SF28528.8to $120 $3,3931605027ft feet 3.0-4.0529.8 Cross Slope (PAR)SF26533.4to $120 $3,1321605037ft feet 5.0-6.0536.2 Cross Slope (PAR)SF12537.8to $120 $1,3921605047ft feet 3.0-4.0538.9 Cross Slope (PAR)SF8540.0to $120 $9571605057ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 815 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912030948 Run ID E 37Th St 96 ID Sidewalk Width Priority feet 4.0-5.0542.1 Cross Slope (PAR)SF28546.0to $120 $3,3931605067ft feet 4.0-5.0548.5 Cross Slope (PAR)SF90560.9to $120 $10,7881605077ft feet560.9 Driveway589.4to166152 feet .28581.5 Vertical Change REF7582.5to138950 7 ft feet 3.0-4.0589.4 Cross Slope (Driveway)SF62597.9to $40 $2,4651605087ft feet 2.0-3.0598.7 Cross Slope (PAR)SF9600.0to $120 $1,1311605097ft feet 5.0-6.0608.8 Cross Slope (PAR)SF11610.3to $120 $1,3051605107ft feet 2.0-3.0614.1 Cross Slope (PAR)SF42619.9to $120 $5,0461605117ft feet .27614.6 Vertical Change REF7615.6to138951 7 ft feet 2.0-3.0624.0 Cross Slope (PAR)SF117640.1to $120 $14,0071605127ft feet 4.0-5.0641.7 Cross Slope (PAR)SF73651.8to $120 $8,7871605137ft feet 2.0-3.0651.8 Cross Slope (PAR)SF30655.9to $120 $3,5671605147ft feet 4.0-5.0656.3 Cross Slope (PAR)SF40661.8to $120 $4,7851605157ft feet .29658.8 Vertical Change REF7659.8to138952 7 ft feet .36665.4 Vertical Change REF7666.4to138953 7 ft feet 4.0-5.0665.4 Cross Slope (PAR)SF299706.7to $120 $35,9311605167ft feet -.31671.9 Vertical Change REF7672.9to138954 7 ft feet .32693.4 Vertical Change REF7694.4to138955 7 ft feet .27702.7 Vertical Change REF7703.7to138956 7 ft feet -.3706.3 Vertical Change REF20709.1to138957 7 ft feet708.4 Driveway730.8to166153 feet .26727.1 Vertical Change REF7728.1to138958 7 ft feet 4.0-5.0731.8 Cross Slope (PAR)SF12733.5to $120 $1,4791605177ft feet 2.0-3.0734.3 Cross Slope (PAR)SF22737.3to $120 $2,6101605187ft feet 4.0-5.0738.2 Cross Slope (PAR)SF166761.1to $120 $19,9231605197ft feet 2.0-3.0761.8 Cross Slope (PAR)SF18764.3to $120 $2,1751605207ft feet 4.0-5.0765.3 Cross Slope (PAR)SF199792.8to $120 $23,9251605217ft feet .38778.5 Vertical Change REF7779.5to138959 7 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 816 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name S SANTA FE AVE End Street Name 1912030948 Run ID E 37Th St 96 ID Sidewalk Width Priority feet 2.0-3.0793.5 Cross Slope (PAR)SF92806.2to $120 $11,0491605227ft feet 5.0-6.0806.9 Cross Slope (PAR)SF10808.3to $120 $1,2181605237ft feet 6.0-7.0808.3 Cross Slope (PAR)SF23811.5to $120 $2,7841605247ft feet 5.0-6.0811.5 Cross Slope (PAR)SF34816.2to $120 $4,0891605257ft feet 3.0-4.0816.8 Cross Slope (PAR)SF141836.2to $120 $16,8781605267ft feet 5.0-6.0836.2 Cross Slope (PAR)SF41841.8to $120 $4,8721605277ft feet 3.0-4.0841.8 Cross Slope (PAR)SF15843.8to $120 $1,7401605287ft feet 2.0-3.0843.8 Cross Slope (PAR)SF15845.8to $120 $1,7401605297ft $374,027.50TOTAL COST FOR:E 37TH STNside of Starting at:2522 E 37TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 817 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name JEWEL AVE End Street Name 1912031056 Run ID E 37Th St 88 ID Sidewalk Width Priority feet 2.0-3.00.3 Cross Slope (PAR)SF212.8to $120 $2,5501602749ft feet 2.0-3.06.3 Cross Slope (PAR)SF9817.8to $120 $11,7301602759ft feet 2.0-3.024.1 Cross Slope (PAR)SF5931.0to $120 $7,0381602769ft feet 2.0-3.040.8 Cross Slope (PAR)SF6448.3to $120 $7,6501602779ft feet 2.0-3.055.8 Cross Slope (PAR)SF10768.4to $120 $12,8521602789ft feet 4.0-5.070.8 Cross Slope (PAR)SF4476.0to $120 $5,3041602799ft feet 2.0-3.076.0 Cross Slope (PAR)SF977.0to $120 $1,0201602809ft feet 3.0-4.096.0 Cross Slope (PAR)SF2999.4to $120 $3,4681602819ft feet 2.0-3.099.8 Cross Slope (PAR)SF514160.3to $120 $61,7101602829ft feet 2.0-3.0163.7 Cross Slope (PAR)SF38168.2to $120 $4,5901602839ft feet 4.0-5.0168.7 Cross Slope (PAR)SF88179.0to $120 $10,5061602849ft feet 5.0-6.0181.3 Cross Slope (PAR)SF40186.0to $120 $4,7941602859ft feet 3.0-4.0186.3 Cross Slope (PAR)SF41191.1to $120 $4,8961602869ft feet 4.0-5.0194.7 Cross Slope (PAR)SF35198.8to $120 $4,1821602879ft feet 6.0-7.0199.8 Cross Slope (PAR)SF11201.1to $120 $1,3261602889ft feet 6.0-7.0206.3 Cross Slope (PAR)SF62213.6to $120 $7,4461602899ft feet 5.0-6.0213.6 Cross Slope (PAR)SF43218.6to $120 $5,1001602909ft feet 3.0-4.0219.2 Cross Slope (PAR)SF28222.5to $120 $3,3661602919ft feet 4.0-5.0225.4 Cross Slope (PAR)SF101237.3to $120 $12,1381602929ft feet 2.0-3.0237.3 Cross Slope (PAR)SF76246.2to $120 $9,0781602939ft feet 4.0-5.0246.2 Cross Slope (PAR)SF24249.0to $120 $2,8561602949ft feet 6.0-7.0249.0 Cross Slope (PAR)SF23251.7to $120 $2,7541602959ft feet 5.0-6.0251.7 Cross Slope (PAR)SF16253.6to $120 $1,9381602969ft feet 3.0-4.0254.3 Cross Slope (PAR)SF41259.1to $120 $4,8961602979ft feet 5.0-6.0259.4 Cross Slope (PAR)SF25262.3to $120 $2,9581602989ft feet 3.0-4.0263.0 Cross Slope (PAR)SF153281.0to $120 $18,3601602999ft feet -.26275.2 Vertical Change REF9276.2to138870 9 ft feet 5.0-6.0281.7 Cross Slope (PAR)SF81291.2to $120 $9,6901603009ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 818 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name JEWEL AVE End Street Name 1912031056 Run ID E 37Th St 88 ID Sidewalk Width Priority feet 3.0-4.0293.6 Cross Slope (PAR)SF12295.0to $120 $1,4281603019ft feet 2.0-3.0297.2 Cross Slope (PAR)SF208321.7to $120 $24,9901603029ft feet .26314.9 Vertical Change REF9315.9to138871 9 ft feet 4.0-5.0321.7 Cross Slope (PAR)SF277354.3to $120 $33,2521603039ft feet 2.0-3.0355.2 Cross Slope (PAR)SF23357.9to $120 $2,7541603049ft feet 4.0-5.0359.5 Cross Slope (PAR)SF116373.1to $120 $13,8721603059ft feet 6.0-7.0374.0 Cross Slope (PAR)SF9375.0to $120 $1,0201603069ft feet 5.0-6.0375.0 Cross Slope (PAR)SF28378.3to $120 $3,3661603079ft feet 3.0-4.0379.0 Cross Slope (PAR)SF63386.4to $120 $7,5481603089ft feet 4.0-5.0389.9 Cross Slope (PAR)SF164409.2to $120 $19,6861603099ft feet .35400.3 Vertical Change REF9401.3to138872 9 ft feet 4.0-5.0412.0 Cross Slope (PAR)SF151429.8to $120 $18,1561603109ft feet430.0 Driveway466.3to166131 feet 5.0-6.0466.9 Cross Slope (PAR)SF50472.8to $120 $6,0181603119ft feet 3.0-4.0475.0 Cross Slope (PAR)SF150492.6to $120 $17,9521603129ft feet 1.44497.0 Vertical Change REF9498.0to138873 9 ft feet 3.0-4.0497.0 Cross Slope (PAR)SF235524.7to $120 $28,2541603139ft feet -.27505.3 Vertical Change REF9506.3to138874 9 ft feet 5.0-6.0524.7 Cross Slope (PAR)SF22527.3to $120 $2,6521603149ft feet 3.0-4.0527.3 Cross Slope (PAR)SF10528.5to $120 $1,2241603159ft feet 2.0-3.0528.5 Cross Slope (PAR)SF45533.8to $120 $5,4061603169ft feet 4.0-5.0533.8 Cross Slope (PAR)SF136549.8to $120 $16,3201603179ft feet -.34541.1 Vertical Change REF9542.1to138875 9 ft feet .35548.6 Vertical Change REF9549.6to138876 9 ft feet 2.0-3.0549.8 Cross Slope (PAR)SF33553.7to $120 $3,9781603189ft feet 4.0-5.0553.7 Cross Slope (PAR)SF145570.8to $120 $17,4421603199ft feet .42568.6 Vertical Change REF9569.6to138877 9 ft feet571.9 Driveway601.6to166132 October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 819 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name JEWEL AVE End Street Name 1912031056 Run ID E 37Th St 88 ID Sidewalk Width Priority feet 4.0-5.0601.7 Cross Slope (Driveway)SF264632.8to $40 $10,5741603209ft feet 4.0-5.0635.6 Cross Slope (PAR)SF125650.3to $120 $14,9941603219ft feet 2.0-3.0650.5 Cross Slope (PAR)SF20652.8to $120 $2,3461603229ft feet 2.0-3.0655.5 Cross Slope (PAR)SF93666.4to $120 $11,1181603239ft feet 4.0-5.0666.4 Cross Slope (PAR)SF63673.8to $120 $7,5481603249ft feet674.1 Driveway703.2to166133 feet -.36693.0 Vertical Change REF9694.0to138878 9 ft feet 4.0-5.0703.3 Cross Slope (Driveway)SF111716.3to $40 $4,4201603259ft feet 2.0-3.0716.3 Cross Slope (PAR)SF13717.8to $120 $1,5301603269ft feet 3.0-4.0721.5 Cross Slope (PAR)SF69729.6to $120 $8,2621603279ft feet .3729.3 Vertical Change REF9730.3to138879 9 ft feet 2.0-3.0729.6 Cross Slope (PAR)SF12731.0to $120 $1,4281603289ft feet 2.0-3.0733.3 Cross Slope (PAR)SF115746.8to $120 $13,7701603299ft feet 4.0-5.0747.8 Cross Slope (PAR)SF114761.2to $120 $13,6681603309ft feet762.0 Driveway798.5to166134 feet .26766.4 Vertical Change REF9767.4to138880 9 ft feet 4.0-5.0798.6 Cross Slope (PAR)SF144815.5to $120 $17,2381603319ft feet -.29812.5 Vertical Change LF9813.5to $75 $6381388819ft feet .29817.4 Vertical Change REF9818.4to138882 9 ft feet 3.0-4.0817.6 Cross Slope (PAR)SF24820.4to $120 $2,8561603329ft feet 2.0-3.0820.4 Cross Slope (PAR)SF17822.4to $120 $2,0401603339ft feet 4.0-5.0825.2 Cross Slope (PAR)SF86835.3to $120 $10,3021603349ft feet .26825.8 Vertical Change REF9826.8to138883 9 ft feet 2.0-3.0837.0 Cross Slope (PAR)SF70845.2to $120 $8,3641603359ft feet 4.0-5.0845.9 Cross Slope (PAR)SF315882.9to $120 $37,7401603369ft feet .31872.9 Vertical Change REF9873.9to138884 9 ft feet883.9 Driveway913.2to166135 feet 4.0-5.0913.5 Cross Slope (PAR)SF82923.2to $120 $9,8941603379ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 820 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 37TH ST Street Side 2522 E 37TH ST Survey Street Name Starting Street Name JEWEL AVE End Street Name 1912031056 Run ID E 37Th St 88 ID Sidewalk Width Priority feet 2.0-3.0923.2 Cross Slope (PAR)SF60930.3to $120 $7,2421603389ft feet 4.0-5.0930.9 Cross Slope (PAR)SF85940.9to $120 $10,2001603399ft feet 5.0-6.0944.2 Cross Slope (PAR)SF77953.3to $120 $9,2821603409ft feet 3.0-4.0953.3 Cross Slope (PAR)SF43958.4to $120 $5,2021603419ft feet 2.0-3.0965.7 Cross Slope (PAR)SF47971.2to $120 $5,6101603429ft feet 2.0-3.0973.6 Cross Slope (PAR)SF30977.1to $120 $3,5701603439ft feet .51979.4 Vertical Change REF9980.4to138885 9 ft feet 4.0-5.0980.2 Cross Slope (PAR)SF59987.1to $120 $7,0381603449ft feet 3.0-4.0990.1 Cross Slope (PAR)SF20992.4to $120 $2,3461603459ft feet .43990.2 Vertical Change REF9991.2to138886 9 ft $678,733.50TOTAL COST FOR:E 37TH STSside of Starting at:2522 E 37TH ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 821 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 37TH ST Street Side IRVING ST Survey Street Name Starting Street Name 2350 E 37TH ST End Street Name 1911211050 Run ID E 37Th St 73 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF46647.8to $120 $55,92614227710ft feet 2.0-3.047.8 Cross Slope (PAR)SF10458.5to $120 $12,51914227810ft feet 4.0-5.058.5 Cross Slope (PAR)SF12271.0to $120 $14,62514227910ft feet 2.0-3.071.0 Cross Slope (PAR)SF5376.4to $120 $6,31814228010ft feet .777.8 Vertical Change SF1078.8to $75 $73113366010ft feet 2.8990.3 Vertical Change SF1091.3to $75 $73113366110ft feet 1.6395.7 Vertical Change SF1096.7to $75 $73113366210ft feet 2.0-3.0101.0 Cross Slope (PAR)SF62107.4to $120 $7,48814228110ft feet 4.0-5.0107.4 Cross Slope (PAR)SF99117.6to $120 $11,93414228210ft feet119.1 Driveway140.8to164620 feet 3.38120.3 Vertical Change REF10121.3to133663 10 ft feet 4.0-5.0140.9 Cross Slope (Driveway)SF232164.7to $40 $9,28214228310ft feet 2.0-3.0164.7 Cross Slope (PAR)SF15166.2to $120 $1,75514228410ft feet 2.0-3.0173.2 Cross Slope (PAR)SF74180.8to $120 $8,89214228510ft feet 2.0-3.0184.8 Cross Slope (PAR)SF400225.8to $120 $47,97014228610ft feet 2.0-3.0228.9 Cross Slope (PAR)SF74236.5to $120 $8,89214228710ft feet236.5 Driveway293.3to164621 feet 2.0-3.0294.6 Cross Slope (PAR)SF200315.1to $120 $23,98514228810ft feet315.5 Driveway364.6to164622 feet 2.0-3.0365.8 Cross Slope (PAR)SF31369.0to $120 $3,74414228910ft feet369.0 Driveway395.9to164623 feet 4.0-5.0396.5 Cross Slope (Driveway)SF38400.4to $40 $1,52114229010ft feet 2.0-3.0400.4 Cross Slope (PAR)SF216422.6to $120 $25,97414229110ft feet 2.34412.1 Vertical Change REF10413.1to133664 10 ft feet 2.0-3.0425.5 Cross Slope (PAR)SF96435.3to $120 $11,46614229210ft feet 1.19428.4 Vertical Change REF10429.4to133665 10 ft feet 2.0-3.0439.7 Cross Slope (PAR)SF98449.8to $120 $11,81714229310ft feet 2.0-3.0455.0 Cross Slope (PAR)SF53460.4to $120 $6,31814229410ft feet 2.0-3.0464.9 Cross Slope (PAR)SF28467.8to $120 $3,39314229510ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 822 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes S E 37TH ST Street Side IRVING ST Survey Street Name Starting Street Name 2350 E 37TH ST End Street Name 1911211050 Run ID E 37Th St 73 ID Sidewalk Width Priority feet 4.0-5.0467.8 Cross Slope (PAR)SF78475.8to $120 $9,36014229610ft feet 1.17474.1 Vertical Change REF10475.1to133666 10 ft feet 2.0-3.0475.8 Cross Slope (PAR)SF42480.1to $120 $5,03114229710ft $290,403.75TOTAL COST FOR:E 37TH STSside of Starting at:IRVING ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 823 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side JEWEL AVE Survey Street Name Starting Street Name 2522 E 37TH ST End Street Name 1912030935 Run ID E 37Th St 80.5 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF202.7to $120 $2,3491605307ft feet 2.0-3.03.3 Cross Slope (PAR)SF418.9to $120 $4,8721605317ft feet 1.817.9 Vertical Change REF78.9to138961 7 ft feet 4.0-5.08.9 Cross Slope (PAR)SF2512.4to $120 $3,0451605327ft feet 2.0-3.012.8 Cross Slope (PAR)SF2516.3to $120 $3,0451605337ft feet16.5 Driveway59.3to166154 feet 2.0-3.059.3 Cross Slope (Driveway)SF8370.8to $40 $3,3351605347ft feet 4.0-5.070.8 Cross Slope (PAR)SF3575.6to $120 $4,1761605357ft feet 2.0-3.077.1 Cross Slope (PAR)SF10892.0to $120 $12,9631605367ft feet 4.0-5.092.7 Cross Slope (PAR)SF505162.4to $120 $60,6391605377ft feet .6393.8 Vertical Change REF794.8to138962 7 ft feet 2.0-3.0163.2 Cross Slope (PAR)SF75173.6to $120 $9,0481605387ft feet 4.0-5.0175.3 Cross Slope (PAR)SF99189.0to $120 $11,9191605397ft feet 2.0-3.0189.0 Cross Slope (PAR)SF20191.7to $120 $2,3491605407ft feet 3.0-4.0194.4 Cross Slope (PAR)SF188220.3to $120 $22,5331605417ft feet 2.0-3.0221.5 Cross Slope (PAR)SF65230.4to $120 $7,7431605427ft feet 2.0-3.0236.1 Cross Slope (PAR)SF24239.4to $120 $2,8711605437ft feet 4.0-5.0240.8 Cross Slope (PAR)SF114256.5to $120 $13,6591605447ft feet 6.0-7.0256.5 Cross Slope (PAR)SF17258.9to $120 $2,0881605457ft feet 4.0-5.0259.8 Cross Slope (PAR)SF12261.5to $120 $1,4791605467ft feet 4.0-5.0263.8 Cross Slope (PAR)SF491331.5to $120 $58,8991605477ft feet -.34283.4 Vertical Change REF7284.4to138963 7 ft feet .27304.2 Vertical Change REF7305.2to138964 7 ft feet 6.0-7.0334.4 Cross Slope (PAR)SF16336.6to $120 $1,9141605487ft feet 2.0-3.0339.2 Cross Slope (PAR)SF22342.2to $120 $2,6101605497ft feet 2.0-3.0347.0 Cross Slope (PAR)SF24350.3to $120 $2,8711605507ft feet 2.0-3.0361.2 Cross Slope (PAR)SF26364.8to $120 $3,1321605517ft feet 2.0-3.0368.5 Cross Slope (PAR)SF9369.7to $120 $1,0441605527ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 824 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side JEWEL AVE Survey Street Name Starting Street Name 2522 E 37TH ST End Street Name 1912030935 Run ID E 37Th St 80.5 ID Sidewalk Width Priority feet 2.0-3.0377.1 Cross Slope (PAR)SF9378.3to $120 $1,0441605537ft feet 2.0-3.0380.6 Cross Slope (PAR)SF189406.7to $120 $22,7071605547ft feet -.28387.9 Vertical Change REF7388.9to138966 7 ft feet -.26415.4 Vertical Change REF7416.4to138967 7 ft feet 2.0-3.0416.2 Cross Slope (PAR)SF27419.9to $120 $3,2191605557ft feet 2.0-3.0458.3 Cross Slope (PAR)SF32462.7to $120 $3,8281605567ft feet 2.0-3.0467.6 Cross Slope (PAR)SF20470.3to $120 $2,3491605577ft feet 2.0-3.0472.4 Cross Slope (PAR)SF10473.8to $120 $1,2181605587ft feet 2.0-3.0478.0 Cross Slope (PAR)SF106492.6to $120 $12,7021605597ft feet 3.0-4.0494.8 Cross Slope (PAR)SF21497.7to $120 $2,5231605607ft feet 2.0-3.0497.7 Cross Slope (PAR)SF29501.7to $120 $3,4801605617ft feet 4.0-5.0503.3 Cross Slope (PAR)SF117519.5to $120 $14,0941605627ft feet 2.0-3.0520.8 Cross Slope (PAR)SF73530.9to $120 $8,7871605637ft feet 3.0-4.0537.4 Cross Slope (PAR)SF16539.6to $120 $1,9141605647ft feet 2.0-3.0539.6 Cross Slope (PAR)SF9540.8to $120 $1,0441605657ft feet 2.0-3.0544.5 Cross Slope (PAR)SF120561.1to $120 $14,4421605667ft feet -.28551.1 Vertical Change REF7552.1to138968 7 ft feet 2.0-3.0563.3 Cross Slope (PAR)SF28567.1to $120 $3,3061605677ft feet 2.0-3.0571.6 Cross Slope (PAR)SF19574.2to $120 $2,2621605687ft feet 2.0-3.0576.3 Cross Slope (PAR)SF188602.2to $120 $22,5331605697ft feet 4.0-5.0602.2 Cross Slope (PAR)SF30606.3to $120 $3,5671605707ft feet .66604.2 Vertical Change REF7605.2to138969 7 ft feet 2.0-3.0608.3 Cross Slope (PAR)SF11609.8to $120 $1,3051605717ft feet 3.0-4.0619.3 Cross Slope (PAR)SF29623.3to $120 $3,4801605727ft feet 2.0-3.0623.3 Cross Slope (PAR)SF40628.8to $120 $4,7851605737ft feet -.33628.6 Vertical Change REF7629.6to138970 7 ft feet 2.0-3.0630.9 Cross Slope (PAR)SF94643.9to $120 $11,3101605747ft feet .26637.1 Vertical Change REF7638.1to138971 7 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 825 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side JEWEL AVE Survey Street Name Starting Street Name 2522 E 37TH ST End Street Name 1912030935 Run ID E 37Th St 80.5 ID Sidewalk Width Priority feet 2.0-3.0646.4 Cross Slope (PAR)SF54653.8to $120 $6,4381605757ft feet 2.0-3.0662.8 Cross Slope (PAR)SF117679.0to $120 $14,0941605767ft feet 4.0-5.0679.0 Cross Slope (PAR)SF91691.6to $120 $10,9621605777ft feet693.8 Driveway719.0to166155 feet 2.0-3.0720.3 Cross Slope (PAR)SF22723.4to $120 $2,6971605787ft feet 2.0-3.0727.9 Cross Slope (PAR)SF50734.8to $120 $6,0031605797ft feet 4.0-5.0735.4 Cross Slope (PAR)SF50742.3to $120 $6,0031605807ft feet 2.0-3.0746.2 Cross Slope (PAR)SF109761.3to $120 $13,1371605817ft feet 4.0-5.0761.3 Cross Slope (PAR)SF108776.2to $120 $12,9631605827ft feet 2.0-3.0776.6 Cross Slope (PAR)SF102790.7to $120 $12,2671605837ft feet 4.0-5.0790.7 Cross Slope (PAR)SF26794.3to $120 $3,1321605847ft feet 2.0-3.0794.3 Cross Slope (PAR)SF159816.2to $120 $19,0531605857ft feet 3.0-4.0818.3 Cross Slope (PAR)SF27822.0to $120 $3,2191605867ft feet 2.0-3.0824.1 Cross Slope (PAR)SF87836.1to $120 $10,4401605877ft feet 4.0-5.0836.1 Cross Slope (PAR)SF118852.4to $120 $14,1811605887ft feet 2.0-3.0853.5 Cross Slope (PAR)SF68862.9to $120 $8,1781605897ft feet 2.0-3.0868.0 Cross Slope (PAR)SF84879.6to $120 $10,0921605907ft feet 2.0-3.0887.8 Cross Slope (PAR)SF91900.3to $120 $10,8751605917ft feet 2.0-3.0904.2 Cross Slope (PAR)SF9905.5to $120 $1,1311605927ft feet907.3 Driveway948.5to166156 feet 2.0-3.0948.5 Cross Slope (Driveway)SF122965.3to $40 $4,8721605937ft feet .27966.9 Vertical Change REF7967.9to138972 7 ft feet 2.0-3.0967.7 Cross Slope (PAR)SF12969.4to $120 $1,4791605947ft feet 4.0-5.0970.3 Cross Slope (PAR)SF87982.3to $120 $10,4401605957ft feet 2.0-3.0984.1 Cross Slope (PAR)SF79995.0to $120 $9,4831605967ft feet 2.0-3.0997.3 Cross Slope (PAR)SF351002.1to $120 $4,1761605977ft $579,797.00TOTAL COST FOR:E 37TH STNside of Starting at:JEWEL AVE October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 826 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side ROSS ST Survey Street Name Starting Street Name IRVING ST End Street Name 1911211029 Run ID E 37Th St 69.5 ID Sidewalk Width Priority feet 3.0-4.00.0 Cross Slope (PAR)SF464.8to $120 $5,47214230910ft feet 2.0-3.04.8 Cross Slope (PAR)SF8714.0to $120 $10,48814231010ft feet 2.0-3.016.1 Cross Slope (PAR)SF11528.2to $120 $13,79414231110ft feet .3527.6 Vertical Change REF1028.6to133673 10 ft feet 3.0-4.030.8 Cross Slope (PAR)SF10541.8to $120 $12,54014231210ft feet 3.0-4.044.8 Cross Slope (PAR)SF12457.8to $120 $14,82014231310ft feet58.8 Driveway72.3to164625 feet 3.0-4.072.3 Cross Slope (Driveway)SF2975.3to $40 $1,14014231410ft feet 3.4475.2 Vertical Change REF1076.2to133674 10 ft feet 2.0-3.075.3 Cross Slope (PAR)SF8083.7to $120 $9,57614231510ft feet 3.0-4.087.5 Cross Slope (PAR)SF2189.7to $120 $2,50814231610ft feet 2.0-3.091.3 Cross Slope (PAR)SF202112.6to $120 $24,28214231710ft feet 3.0-4.0115.5 Cross Slope (PAR)SF49120.7to $120 $5,92814231810ft feet 3.0-4.0124.1 Cross Slope (PAR)SF16125.8to $120 $1,93814231910ft feet 2.0-3.0126.6 Cross Slope (PAR)SF92136.3to $120 $11,05814232010ft feet137.7 Driveway169.8to164626 feet 2.0-3.0171.4 Cross Slope (PAR)SF89180.8to $120 $10,71614232110ft feet 3.0-4.0184.7 Cross Slope (PAR)SF19186.7to $120 $2,28014232210ft feet .28186.6 Vertical Change REF10187.6to133675 10 ft feet186.7 Driveway210.2to164627 feet 4.0-5.0210.8 Cross Slope (PAR)SF62217.3to $120 $7,41014232310ft feet 2.0-3.0219.8 Cross Slope (PAR)SF352256.9to $120 $42,29414232410ft feet .4252.7 Vertical Change REF10253.7to133676 10 ft feet 2.0-3.0259.0 Cross Slope (PAR)SF293289.8to $120 $35,11214232510ft feet 3.0-4.0292.5 Cross Slope (PAR)SF101303.1to $120 $12,08414232610ft feet 2.0-3.0304.1 Cross Slope (PAR)SF12305.4to $120 $1,48214232710ft feet306.4 Driveway373.8to164628 feet -.37327.3 Vertical Change REF35331.0to133677 10 ft feet 4.0-5.0375.4 Cross Slope (PAR)SF85384.3to $120 $10,14614232810ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 827 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side ROSS ST Survey Street Name Starting Street Name IRVING ST End Street Name 1911211029 Run ID E 37Th St 69.5 ID Sidewalk Width Priority feet 2.0-3.0385.8 Cross Slope (PAR)SF22388.1to $120 $2,62214232910ft feet 2.0-3.0392.8 Cross Slope (PAR)SF201414.0to $120 $24,16814233010ft feet 2.0-3.0417.8 Cross Slope (PAR)SF333452.9to $120 $40,01414233110ft feet .39423.8 Vertical Change REF10424.8to133678 10 ft feet .35452.6 Vertical Change REF10453.6to133679 10 ft feet 2.0-3.0455.7 Cross Slope (PAR)SF91465.3to $120 $10,94414233210ft feet465.3 Cold Patch 19467.3to140218 10 ft feet 2.0-3.0469.4 Cross Slope (PAR)SF66476.3to $120 $7,86614233310ft feet .26477.8 Vertical Change REF10478.8to133680 10 ft feet 2.0-3.0478.8 Cross Slope (PAR)SF12480.1to $120 $1,48214233410ft feet 4.0-5.0480.9 Cross Slope (PAR)SF61487.3to $120 $7,29614233510ft feet 3.0-4.0489.5 Cross Slope (PAR)SF65496.3to $120 $7,75214233610ft feet497.1 Driveway524.8to164629 feet 2.0-3.0525.3 Cross Slope (Driveway)SF29528.4to $40 $1,17814233710ft feet528.4 Cold Patch 22530.7to140219 10 ft feet -.29529.8 Vertical Change LF10530.8to $75 $71313368110ft feet 2.0-3.0531.7 Cross Slope (PAR)SF100542.2to $120 $11,97014233810ft feet .36532.9 Vertical Change REF10533.9to133682 10 ft feet 2.0-3.0546.4 Cross Slope (PAR)SF57552.4to $120 $6,84014233910ft feet 2.0-3.0556.1 Cross Slope (PAR)SF145571.4to $120 $17,44214234010ft feet571.7 Driveway602.9to164630 feet 2.0-3.0609.6 Cross Slope (PAR)SF83618.3to $120 $9,91814234110ft feet618.3 Cold Patch 22620.6to140220 10 ft feet 2.0-3.0621.3 Cross Slope (PAR)SF12622.6to $120 $1,48214234210ft feet 2.0-3.0625.8 Cross Slope (PAR)SF238650.8to $120 $28,50014234310ft feet 2.0-3.0657.7 Cross Slope (PAR)SF46662.5to $120 $5,47214234410ft feet662.5 Driveway694.5to164631 feet695.0 Cold Patch 15696.6to140221 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 828 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side ROSS ST Survey Street Name Starting Street Name IRVING ST End Street Name 1911211029 Run ID E 37Th St 69.5 ID Sidewalk Width Priority feet 3.0-4.0696.6 Cross Slope (PAR)SF17698.4to $120 $2,05214234510ft feet 2.0-3.0698.4 Cross Slope (PAR)SF23700.8to $120 $2,73614234610ft feet710.1 Driveway774.1to164632 feet .32714.7 Vertical Change REF10715.7to133683 10 ft feet .34754.2 Vertical Change REF10755.2to133684 10 ft feet .5775.9 Vertical Change REF10776.9to133685 10 ft feet 7.0-8.0776.8 Cross Slope (PAR)SF10777.8to $120 $1,14014234710ft feet778.3 Driveway794.8to164633 feet .26795.7 Vertical Change LF10796.7to $75 $71313368610ft feet 2.0-3.0797.3 Cross Slope (PAR)SF24799.8to $120 $2,85014234810ft feet 4.0-5.0799.8 Cross Slope (PAR)SF125813.0to $120 $15,04814234910ft feet 2.0-3.0816.9 Cross Slope (PAR)SF13818.3to $120 $1,59614235010ft feet 3.0-4.0821.5 Cross Slope (PAR)SF60827.8to $120 $7,18214235110ft feet828.3 Driveway841.5to164634 feet 4.0-5.0841.5 Cross Slope (Driveway)SF86850.6to $40 $3,45814235210ft feet 3.38842.1 Vertical Change REF10843.1to133687 10 ft feet .68844.7 Vertical Change REF10845.7to133688 10 ft feet 3.37850.3 Vertical Change REF10851.3to133689 10 ft feet 2.0-3.0854.3 Cross Slope (PAR)SF364892.6to $120 $43,66214235310ft feet .27867.6 Vertical Change REF10868.6to133690 10 ft feet 3.06878.5 Vertical Change REF10879.5to133691 10 ft feet .67891.5 Vertical Change REF10892.5to133692 10 ft feet893.5 Driveway910.7to164635 feet 3.48897.9 Vertical Change REF10898.9to133693 10 ft feet 1.35905.3 Vertical Change REF10906.3to133694 10 ft feet 3.0-4.0911.4 Cross Slope (Driveway)SF70918.8to $40 $2,81214235410ft feet 2.0-3.0918.8 Cross Slope (PAR)SF57924.8to $120 $6,84014235510ft feet 4.0-5.0925.3 Cross Slope (PAR)SF58931.4to $120 $6,95414235610ft feet 2.0-3.0931.4 Cross Slope (PAR)SF112943.2to $120 $13,45214235710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 829 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side ROSS ST Survey Street Name Starting Street Name IRVING ST End Street Name 1911211029 Run ID E 37Th St 69.5 ID Sidewalk Width Priority feet .3932.3 Vertical Change REF10933.3to133695 10 ft feet943.2 Driveway1007.1to164636 feet .41951.4 Vertical Change REF10952.4to133696 10 ft feet .28994.3 Vertical Change REF10995.3to133697 10 ft feet .321007.1 Vertical Change REF101008.1to133698 10 ft $531,221.00TOTAL COST FOR:E 37TH STNside of Starting at:ROSS ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 830 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side ROSS ST Survey Street Name Starting Street Name S ALAMEDA ST End Street Name 1911211240 Run ID E 37Th St 55.5 ID Sidewalk Width Priority feet 2.0-3.00.3 Cross Slope (PAR)SF162.0to $120 $1,93814194710ft feet 2.0-3.04.8 Cross Slope (PAR)SF9514.8to $120 $11,40014194810ft feet 4.0-5.015.1 Cross Slope (PAR)SF4519.8to $120 $5,35814194910ft feet 4.0-5.022.4 Cross Slope (PAR)SF13736.8to $120 $16,41614195010ft feet -.2728.1 Vertical Change REF1029.1to133524 10 ft feet 2.0-3.036.8 Cross Slope (PAR)SF2539.4to $120 $2,96414195110ft feet 1.5837.5 Vertical Change REF1038.5to133525 10 ft feet39.4 Driveway55.3to164581 feet .7146.1 Vertical Change REF1047.1to133526 10 ft feet 2.0-3.055.3 Cross Slope (Driveway)SF1957.3to $40 $76014195210ft feet 2.0-3.060.5 Cross Slope (PAR)SF8969.9to $120 $10,71614195310ft feet 2.0-3.073.2 Cross Slope (PAR)SF9583.2to $120 $11,40014195410ft feet83.2 Driveway101.3to164582 feet115.9 Driveway155.9to164583 feet -.38156.4 Vertical Change REF10157.4to133527 10 ft feet 3.0-4.0157.3 Cross Slope (PAR)SF125170.5to $120 $15,04814195510ft feet 4.0-5.0174.3 Cross Slope (PAR)SF152190.3to $120 $18,24014195610ft feet 2.0-3.0192.4 Cross Slope (PAR)SF124205.5to $120 $14,93414195710ft feet .87200.0 Vertical Change SF10201.0to $75 $71313352810ft feet205.8 Driveway232.6to164584 feet 2.0-3.0234.2 Cross Slope (PAR)SF10235.3to $120 $1,25414195810ft feet 4.0-5.0236.8 Cross Slope (PAR)SF86245.9to $120 $10,37414195910ft feet 2.9241.5 Vertical Change REF10242.5to133529 10 ft feet 2.0-3.0245.9 Cross Slope (PAR)SF53251.5to $120 $6,38414196010ft feet 4.0-5.0252.2 Cross Slope (PAR)SF82260.8to $120 $9,80414196110ft feet -.33254.2 Vertical Change REF10255.2to133530 10 ft feet 2.0-3.0264.3 Cross Slope (PAR)SF10265.4to $120 $1,25414196210ft feet266.5 Driveway280.6to164585 feet .33268.3 Vertical Change REF10269.3to133531 10 ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 831 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side ROSS ST Survey Street Name Starting Street Name S ALAMEDA ST End Street Name 1911211240 Run ID E 37Th St 55.5 ID Sidewalk Width Priority feet 4.0-5.0281.5 Cross Slope (PAR)SF319315.1to $120 $38,30414196310ft feet -.3300.2 Vertical Change REF10301.2to133532 10 ft feet -.32312.6 Vertical Change REF10313.6to133533 10 ft feet 3.0-4.0317.6 Cross Slope (PAR)SF83326.3to $120 $9,91814196410ft feet -.55318.5 Vertical Change REF10319.5to133534 10 ft feet326.3 Driveway349.4to164586 feet 5.0-6.0349.5 Cross Slope (PAR)SF29352.6to $120 $3,53414196510ft feet 3.0-4.0352.6 Cross Slope (PAR)SF17354.4to $120 $2,05214196610ft feet 2.0-3.0354.4 Cross Slope (PAR)SF19356.4to $120 $2,28014196710ft feet 2.0-3.0361.3 Cross Slope (PAR)SF102372.0to $120 $12,19814196810ft feet372.8 Driveway404.8to164587 feet .33394.5 Vertical Change REF10395.5to133535 10 ft feet .36406.9 Vertical Change REF10407.9to133536 10 ft feet 4.0-5.0407.0 Cross Slope (PAR)SF43411.5to $120 $5,13014196910ft feet 2.0-3.0412.8 Cross Slope (PAR)SF59419.0to $120 $7,06814197010ft feet 2.1416.5 Vertical Change REF10417.5to133537 10 ft feet 4.0-5.0419.0 Cross Slope (PAR)SF216441.7to $120 $25,87814197110ft feet 1.07428.4 Vertical Change REF10429.4to133538 10 ft feet 2.0-3.0441.7 Cross Slope (PAR)SF257468.8to $120 $30,89414197210ft feet .3458.4 Vertical Change REF10459.4to133539 10 ft feet 4.0-5.0468.8 Cross Slope (PAR)SF42473.2to $120 $5,01614197310ft feet 3.0-4.0475.3 Cross Slope (PAR)SF48480.4to $120 $5,81414197410ft feet480.8 Driveway522.3to164588 feet -.26503.1 Vertical Change REF10504.1to133540 10 ft feet 3.0-4.0522.3 Cross Slope (Driveway)SF66529.2to $40 $2,62214197510ft feet .34530.2 Vertical Change LF10531.2to $75 $71313354110ft feet 3.0-4.0531.8 Cross Slope (PAR)SF13533.2to $120 $1,59614197610ft feet 2.0-3.0534.2 Cross Slope (PAR)SF95544.2to $120 $11,40014197710ft October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 832 Access Compliance Survey Report - SidewalksCity of Vernon Year to be Completed TBDFunding Source:TBD Dist. from Corner UnitQtyBarrier Type Total CostAs-is Measurement/Notes N E 37TH ST Street Side ROSS ST Survey Street Name Starting Street Name S ALAMEDA ST End Street Name 1911211240 Run ID E 37Th St 55.5 ID Sidewalk Width Priority feet 2.03548.4 Vertical Change REF10549.4to133542 10 ft feet 2.0-3.0548.8 Cross Slope (PAR)SF81557.3to $120 $9,69014197810ft feet 4.0-5.0557.3 Cross Slope (PAR)SF67564.3to $120 $7,98014197910ft $321,043.00TOTAL COST FOR:E 37TH STNside of Starting at:ROSS ST October 2020 Prepared by Sally Swanson Architects, Inc. Project #19033.00 833