20200901 Regular City Council Meeting - Packet (6) FEEDER 21 7 KV Outage 8/20/2020 It pme Oral Repot
VPU Presentation
•
ON THURSDAY, AUGUST 20,
2020 AT 9 :56 A.M. VPU
5 EXPERIENCED A 16 MINUTES,
AND 18 SECONDS OUTAGE
ON THE FEEDER 21 7KV
R .
CIRCUIT. THE CAUSE OF THE
, < OUTAGE WAS FOUND TO BE
t MYLAR BALLOONS NEAR
:HOT: F=wl
POLE #312VP AT ST.
--. _ CHARLES AND VERNON
AVE. A TOTAL OF 28
CUSTOMERS WERE
Outage Time Restoration Duration INTERRUPTED.
0•
- • •
FEEDER 5 7 KV Outage 8/22/2020
ON SATURDAY, AUGUST 22,
2020 AT 1 1 :24 A.M. V P U
EXPERIENCED A 1 HOUR, 3
w� MINUTES AND 27 SECONDS
OUTAGE ON THE FEEDER 5
7KV CIRCUIT. THE CAUSE OF
. A
'� p� - THE OUTAGE WAS FOUND
HOTM1 TO BE A DUMP TRUCK
L OPEN
.._ - HITTING POLE # 10325EV AT
I l`= 4201 ROSS ST. A TOTAL OF
28 CUSTOMERS WERE
BRIEFLY INTERRUPTED.
Restoration 1 Hour, 3
• •
#2 Bank Transformer 66/7KV Outage
8/29/2020- 10 circuits total + 6 Auxiliary
ON SATURDAY, AUGUST 29,
2020 AT 10:06 P.M. VPU
EXPERIENCED A OUTAGE ON
VS #2 BANK DIFFERENI JAL�PROTECTION THE #2 TRANSFORMER BANK
66/7KV. TRANSFORMER WAS
171,1EIIT�kL CARRYING 10 CIRCUIT
EN TRIP IHST 8T-� 87-2 87-3 50 51
FEEDERS: 2, 4, 5, 6, 7, 9,
F"'.f TYPE OVERCllARE11T T4AGET Y{NTS 5?A`tl5 OT HEA SET [hkE�[�L�ApVO 1
RESET METER E
-� 1 1 , 14, 15, 16 AN D 6 AUXI LIARY
--- 1-- POWER AT THE PLANT.
is ; .� . , , •_ RECOVERY TIME RANGED
,,� BETWEEN 36 AND 45 MINUTES
DUE TO EMERGENCY
` SWITCHING. THE CAUSE WAS
DUE TO MYLAR BALLOONS
COMING IN CONTACT WITH #2
Restoration Time Duration BANK. A TOTAL OF 233
Outage - 0. - ' 'throug between 3. . CUSTOMERS AFFECTED.
'22
.70
45 minutes
1770
t'