20200901 Regular City Council Meeting - Packet (6) FEEDER 21 7 KV Outage 8/20/2020 It pme Oral Repot VPU Presentation • ON THURSDAY, AUGUST 20, 2020 AT 9 :56 A.M. VPU 5 EXPERIENCED A 16 MINUTES, AND 18 SECONDS OUTAGE ON THE FEEDER 21 7KV R . CIRCUIT. THE CAUSE OF THE , < OUTAGE WAS FOUND TO BE t MYLAR BALLOONS NEAR :HOT: F=wl POLE #312VP AT ST. --. _ CHARLES AND VERNON AVE. A TOTAL OF 28 CUSTOMERS WERE Outage Time Restoration Duration INTERRUPTED. 0• - • • FEEDER 5 7 KV Outage 8/22/2020 ON SATURDAY, AUGUST 22, 2020 AT 1 1 :24 A.M. V P U EXPERIENCED A 1 HOUR, 3 w� MINUTES AND 27 SECONDS OUTAGE ON THE FEEDER 5 7KV CIRCUIT. THE CAUSE OF . A '� p� - THE OUTAGE WAS FOUND HOTM1 TO BE A DUMP TRUCK L OPEN .._ - HITTING POLE # 10325EV AT I l`= 4201 ROSS ST. A TOTAL OF 28 CUSTOMERS WERE BRIEFLY INTERRUPTED. Restoration 1 Hour, 3 • • #2 Bank Transformer 66/7KV Outage 8/29/2020- 10 circuits total + 6 Auxiliary ON SATURDAY, AUGUST 29, 2020 AT 10:06 P.M. VPU EXPERIENCED A OUTAGE ON VS #2 BANK DIFFERENI JAL�PROTECTION THE #2 TRANSFORMER BANK 66/7KV. TRANSFORMER WAS 171,1EIIT�kL CARRYING 10 CIRCUIT EN TRIP IHST 8T-� 87-2 87-3 50 51 FEEDERS: 2, 4, 5, 6, 7, 9, F"'.f TYPE OVERCllARE11T T4AGET Y{NTS 5?A`tl5 OT HEA SET [hkE�[�L�ApVO 1 RESET METER E -� 1 1 , 14, 15, 16 AN D 6 AUXI LIARY --- 1-- POWER AT THE PLANT. is ; .� . , , •_ RECOVERY TIME RANGED ,,� BETWEEN 36 AND 45 MINUTES DUE TO EMERGENCY ` SWITCHING. THE CAUSE WAS DUE TO MYLAR BALLOONS COMING IN CONTACT WITH #2 Restoration Time Duration BANK. A TOTAL OF 233 Outage - 0. - ' 'throug between 3. . CUSTOMERS AFFECTED. '22 .70 45 minutes 1770 t'