20240416 Regular City Council Meeting - PacketRegular City Council Meeting Agenda April 16, 2024
Page 1 of 5
Agenda
City of Vernon
Regular City Council Meeting
Tuesday, April 16, 2024, 9:00 AM
City Hall, Council Chamber
4305 Santa Fe Avenue, Vernon, California
Crystal Larios, Mayor
Judith Merlo, Mayor Pro Tem
Melissa Ybarra, Council Member
Leticia Lopez, Council Member
Jesus Rivera, Council Member
The public is encouraged to view the agenda and meeting at CityofVernon.org/publicmeetings. You
may address the Council in the Council Chambers, via mail or email to
PublicComment@cityofvernon.org, include the meeting date and item number in the subject line
(mail and/or email must be received at least two hours prior to the start of the meeting).
CALL TO ORDER
FLAG SALUTE
ROLL CALL
APPROVAL OF AGENDA
PUBLIC COMMENT
At this time the public is encouraged to address the City Council on any matter that is within the
subject matter jurisdiction of the City Council. The public will also be given a chance to comment
on matters which are on the posted agenda during City Council deliberation on those specific
matters.
PUBLIC HEARINGS
1. Amendments to Vernon Municipal Code Sections 17.56.060 and 17.57.020 pertaining
to Automobile Parking and Truck Loading
Recommendation:
A. Find that proposed action is exempt from California Environmental Quality Act (CEQA)
review, because it is general policy and procedure-making activity that is unrelated to any
specific project, which must undergo separate CEQA review, and that will not result in direct
physical changes or reasonably foreseeable indirect physical changes in the environment,
and therefore does not constitute a “project” as defined by CEQA Guidelines Section 15378;
Regular City Council Meeting Agenda April 16, 2024
Page 2 of 5
B. Introduce and conduct first reading of Ordinance No. 1300 amending Tables 17.56.060(B)
and 17.56.060(C) in Section 17.56.060 and Table 17.57.020(B) in Section 17.57.020 of the
Vernon Municipal Code regarding standards and requirements for automobile parking and
truck loading for Data Centers; and
C. Direct staff to schedule second reading and adoption of Ordinance No. 1300 at the next
scheduled City Council meeting.
CONSENT CALENDAR
All matters listed on the Consent Calendar are to be approved with one motion. Items may be
removed from the Consent Calendar for individual consideration. Removed items will be
considered immediately following the Consent Calendar.
2. Meeting Minutes
Recommendation:
Approve the April 2, 2024 Regular City Council Meeting Minutes.
3. Claims Against the City
Recommendation:
Receive and file the claim submitted by Kevin Yee.
4. Operating Account Warrant Register
Recommendation:
Approve Operating Account Warrant Register No. 128, for the period of March 3 through
March 16, 2024, totaling $9,717,202.88 and consisting of ratification of electronic payments
totaling $9,235,499.76 and ratification of the issuance of early checks totaling $481,703.12.
5. Fire Department Activity Report
Recommendation:
Receive and file the February 2024 Fire Department Activity Report.
6. City of Vernon National Pollution Discharge Elimination System (NPDES) Permit Duly
Authorized Representatives
Recommendation:
A. Adopt Resolution No. 2024-05 repealing Resolution No. 2014-06 related to the NPDES
Permit Authorized Representatives; and
B. Authorize the Director of Public Works, Director of Health and Environmental Control and
the General Manager of Vernon Public Utilities as duly authorized representatives, to sign,
certify, and electronically submit permit registration documents, notices of termination, and
any other documents, reports, or information required by the NPDES permit.
7. Arbor Day Proclamation and Application for Tree City USA 2024
Recommendation:
A. Proclaim April 26, 2024 as Arbor Day in the City of Vernon;
B. Authorize the Public Works Department to apply to the Arbor Day Foundation for Tree City
USA 2024 certification; and
C. Authorize the Mayor to sign the 2024 Tree City USA Application for Certification when it
becomes available.
Regular City Council Meeting Agenda April 16, 2024
Page 3 of 5
8. Contract with Bear Electrical Solutions, Inc. for Citywide Traffic Signal Maintenance
and Repair FY 2024 Project - Contract No. 20240283
Recommendation:
A. Find that the proposed action is categorically exempt from California Environmental
Quality Act (CEQA) review, in accordance with CEQA Guidelines Section 15301, because
the project consists of the maintenance, repair or minor alteration of existing traffic signals
and involves negligible or no expansion of an existing use;
B. Accept the bid from Bear Electrical Solutions, Inc. (Bear Electrical) as the lowest
responsive and responsible bidder, and reject all other bids;
C. Approve and authorize the City Administrator to execute a contract with Bear Electrical in
substantially the same form as submitted, for the Citywide Traffic Signal Maintenance and
Repair FY 2024 Project, in an amount not-to-exceed $200,000 per year for a total of
$600,000 over the three-year term of Contract No. 20240283; and
D. Authorize a contingency of ten percent (10%) or $60,000 in the event of an unexpected
changed condition or additional extraordinary maintenance and grant authority to the City
Administrator to issue a change order for an amount up to the contingency amount, if
necessary.
9. Notice of Completion for Contract No. 20240122 Gifford Avenue, 48th, 49th, & 50th
Street
Recommendation:
A. Find that the proposed action is categorically exempt from California Environmental
Quality Act (CEQA) review, in accordance with CEQA Guidelines Section 15301, because
the project consists of the maintenance, repair or minor alteration of existing streets and
involves negligible or no expansion of an existing use;
B. Accept the work of Hardy & Harper, Inc. as related to City Contract No. 20240122; and
C. Authorize the Director of Public Works to execute and submit the Notice of Completion for
the project to the Los Angeles County Recorder’s Office.
10. Letter Agreement with Southern California Edison Company
Recommendation:
A. Find that the proposed action is categorically exempt from California Environmental
Quality Act (CEQA) review, because the work being approved by this Letter Agreement
(Phase 1) consists of engineering and materials procurement that will not result in direct or
indirect physical changes in the environment, and therefore does not constitute a “project” as
defined by CEQA Guidelines Section 15378. Upon completion of Phase 1, a separate Letter
Agreement will be presented to City Council for the construction portion of this project
(Phase 2);
B. Approve and authorize the City Administrator to execute a Letter Agreement with
Southern California Edison Company (SCE), in substantially the same form as submitted, for
SCE to perform required engineering and procurement work related to Interconnection
Facilities, Distribution Upgrades, and Network Upgrades, in an amount not-to-exceed
$14,024,895; and
C. Authorize a contingency amount of five percent (5%) or $701,245 for unforeseen changes
in fees or other expenses not included in the proposal, and grant authority to the City
Administrator to issue change orders for an amount up to the contingency amount, if
necessary.
Regular City Council Meeting Agenda April 16, 2024
Page 4 of 5
11. Services Agreement with Renne Public Policy Group for Legislative and Regulatory
Advocacy
Recommendation:
Approve and authorize the City Administrator to execute a Professional Services Agreement
with Renne Public Policy Group (RPPG), in substantially the same form as submitted, for
legislative and regulatory advocacy services for a total amount not-to-exceed $447,000 for a
three-year term.
ORAL REPORTS
12. City Administrator Reports on Activities and Other Announcements
13. Council Reports on Activities (including AB 1234), Announcements, or Directives to
Staff
CLOSED SESSION
14. Conference with Legal Counsel – Anticipated Litigation
Government Code Section 54956.9(d)(2)
Significant exposure to litigation (1 potential matter)
CLOSED SESSION REPORT
ADJOURNMENT
On April 11, 2024, the foregoing agenda was posted in accordance with the applicable legal
requirements. Regular and Adjourned Regular meeting agendas may be amended up to 72
hours and Special meeting agendas may be amended up to 24 hours in advance of the meeting.
Regular City Council Meeting Agenda April 16, 2024
Page 5 of 5
Guide to City Council Proceedings
Meetings of the City Council are held the first and third Tuesday of each month at 9:00 a.m. and are
conducted in accordance with Rosenberg's Rules of Order (Vernon Municipal Code Section
2.04.020).
Copies of all agenda items and back-up materials are available for review in the City Clerk
Department, Vernon City Hall, 4305 Santa Fe Avenue, Vernon, California, and are available for
public inspection during regular business hours, Monday through Thursday, 7:00 a.m. to 5:30 p.m.
Agenda reports may be reviewed on the City's website at www.cityofvernon.org or copies may be
purchased for $0.10 per page.
Disability-related services are available to enable persons with a disability to participate in this
meeting, consistent with the Americans with Disabilities Act (ADA). In compliance with ADA, if you
need special assistance, please contact the City Clerk department at CityClerk@cityofvernon.org or
(323) 583-8811 at least 48 hours prior to the meeting to assure arrangements can be made.
The Public Comment portion of the agenda is for members of the public to present items, which are
not listed on the agenda but are within the subject matter jurisdiction of the City Council. The City
Council cannot take action on any item that is not on the agenda but matters raised under Public
Comment may be referred to staff or scheduled on a future agenda. Comments are limited to three
minutes per speaker unless a different time limit is announced. Speaker slips are available at the
entrance to the Council Chamber.
Public Hearings are legally noticed hearings. For hearings involving zoning matters, the applicant
and appellant will be given 15 minutes to present their position to the City Council. Time may be set
aside for rebuttal. All other testimony shall follow the rules as set for under Public Comment. If you
challenge any City action in court, you may be limited to raising only those issues you or someone
else raised during the public hearing, or in written correspondence delivered to the City Clerk at or
prior to the public hearing.
Consent Calendar items may be approved by a single motion. If a Council Member or the public
wishes to discuss an item, it may be removed from the calendar for individual consideration. Council
Members may indicate a negative or abstaining vote on any individual item by so declaring prior to
the vote on the motion to adopt the Consent Calendar. Items excluded from the Consent Calendar
will be taken up following action on the Consent Calendar. Public speakers shall follow the
guidelines as set forth under Public Comment.
New Business items are matters appearing before the Council for the first time for formal action.
Those wishing to address the Council on New Business items shall follow the guidelines for Public
Comment.
Closed Session allows the Council to discuss specific matters pursuant to the Brown Act,
Government Code Section 54956.9. Based on the advice of the City Attorney, discussion of these
matters in open session would prejudice the position of the City. Following Closed Session, the City
Attorney will provide an oral report on any reportable matters discussed and actions taken. At the
conclusion of Closed Session, the Council may continue any item listed on the Closed Session
agenda to the Open Session agenda for discussion or to take formal action as it deems appropriate.
City Council Agenda Report
Meeting Date:April 16, 2024
From:Daniel S. Wall, P.E., Director of Public Works
Department:Public Works
Submitted by:Sergio Canales, Assistant Planner
Subject
Amendments to Vernon Municipal Code Sections 17.56.060 and 17.57.020 pertaining to
Automobile Parking and Truck Loading
Recommendation
A. Find that proposed action is exempt from California Environmental Quality Act (CEQA) review,
because it is general policy and procedure-making activity that is unrelated to any specific project,
which must undergo separate CEQA review, and that will not result in direct physical changes
or reasonably foreseeable indirect physical changes in the environment, and therefore does not
constitute a “project” as defined by CEQA Guidelines Section 15378;
B. Introduce and conduct first reading of Ordinance No. 1300 amending Tables 17.56.060(B) and
17.56.060(C) in Section 17.56.060 and Table 17.57.020(B) in Section 17.57.020 of the Vernon
Municipal Code regarding standards and requirements for automobile parking and truck loading
for Data Centers; and
C. Direct staff to schedule second reading and adoption of Ordinance No. 1300 at the next
scheduled City Council meeting.
Background
The development standards for the Industrial Zone in Vernon Municipal Code (VMC) Sections
17.56.060 and 17.57.020 require that new development and buildings comply with minimum
automobile parking, and truck loading. This requirement was established to provide adequate off-
street parking and loading areas to accommodate people normally transacting business at the building.
The last comprehensive update of the City's zoning code occurred in 2008. Design standards
for data centers were included in that update and while these standards have not been
modified, the design of data centers has undergone a dramatic transformation. The data
centers imagined by the zoning code were warehouse buildings that contained computers.
The existing zoning code requirements have not been updated to reflect the current size and
modernization of data centers. Modern data centers have very limited need for automobile
parking as the structure’s purpose is to house server and networking infrastructure. On-site staff
requirements at these properties are very low. In addition, modern data centers have low
loading and unloading requirements, necessitating less truck traffic, and maneuvering.
Modern data centers do not contribute to traffic, create odors, dust, or noise. Modern data
centers are large and steady users of electricity and provide sales tax revenues when computer
equipment is installed and periodically replaced.
Staff recommends that the minimum automobile parking and truck loading requirements for data
centers be amended. The proposed changes to Tables 17.56.060(B) and 17.56.060(C), and
Table 17.57.020(B) are shown below in red:
Table 17.56.060(B)
Minimum Number of Required Automobile Parking Spaces.
.
Item 1 Page 1 of 2
Use Type Required Spaces
Data Center 1 space per 1,250 sq. ft. of gross floor area. 1 space per 7,500 sq. ft. of
gross floor area. For new building construction, 6% of required parking
spaces, rounded up to the nearest whole number, shall be equipped with
a Level 2 or higher EV charger.
Table 17.56.060(C)
Minimum Number of Required Truck Loading Spaces
Use Type Required Spaces
Data Center 1 space per 50,000 sq. ft. of gross floor area.
1 space per data center.
Table 17.57.020(B)
Use Type Required Spaces
Data Center 1.0/KSF1.0/7.5 KSF
With the proposed amendments, the City anticipates that it will have the flexibility to
accommodate a broader range of development and expansion projects which, ultimately, will
positively contribute to the fiscal health and vitality of the City.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Ordinance No. 1300
2. Notice of Public Hearing
.
.
Item 1 Page 2 of 2
ORDINANCE NO. 1300
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF VERNON
AMENDING TABLES 17.56.060(B) AND 17.56.060(C) IN SECTION
17.56.060 AND TABLE 17.57.020(B) IN SECTION 17.57.020 OF THE
VERNON MUNICIPAL CODE REGARDING STANDARDS AND
REQUIREMENTS FOR AUTOMOBILE PARKING AND TRUCK LOADING
SECTION 1. Recitals.
A. The City of Vernon (City) is a municipal corporation and a chartered city of the
State of California organized and existing under its charter and the Constitution of the
State of California.
B. Vernon Municipal Code Title 17 – Zoning (Zoning Code), establishes zoning
regulations and provisions in the City and designates, regulates, and restricts various
matters of zoning and land use.
C. The City Council desires to amend the Vernon Municipal Code regarding
standards and requirements for automobile parking and truck loading for data centers.
D. This ordinance was assessed in accordance with the authority and criteria
contained in the California Environmental Quality Act (CEQA), the State CEQA
Guidelines, and the environmental regulations of the City. The City Council hereby finds
that the proposed action is exempt from CEQA review because it is general policy and
procedure-making activity that is unrelated to any specific project, which must undergo
separate CEQA review, and that will not result in direct physical changes or reasonably
foreseeable indirect physical changes in the environment, and therefore does not
constitute a “project” as defined by CEQA Guidelines Section 15378.
THE CITY COUNCIL OF THE CITY OF VERNON HEREBY ORDAINS:
SECTION 2. The City Council of the City of Vernon finds and determines that
the above recitals are true and correct and are a substantial part of this ordinance.
SECTION 3. Table 17.56.060(B) in Section 17.56.060 of the Vernon Municipal
Code is hereby amended to read as follows:
Table 17.56.060(B)
Minimum Number of Required Automobile Parking Spaces1
Use Type Required Spaces
Industrial Use, Industrial Gas
Manufacturing, and
Recycling Facility (including
1 space per 1,000 sq. ft. of gross floor area.
For new building construction, 6% of required parking
spaces, rounded up to the nearest whole number, shall
.
.
Item 1 Page 1 of 6
Ordinance No. 1300
Page 2 of 6
_______________________
Table 17.56.060(B)
Minimum Number of Required Automobile Parking Spaces1
Use Type Required Spaces
floor area used for ancillary
uses)
be equipped with a Level 2 or higher electric vehicle
(EV) charger.
Commercial Uses 1 space per 250 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Incidental Uses 1 space per 250 sq. ft. of floor area of incidental use.
For new building construction, 6% of required parking
spaces, rounded up to the nearest whole number, shall
be equipped with a Level 2 or higher EV charger.
Data Centers 1 space per 7,500 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Emergency Shelter 1 space for each 5 beds plus 2 additional spaces. For
new building construction, 6% of required parking
spaces, rounded up to the nearest whole number, shall
be equipped with a Level 2 or higher EV charger.
Health Clubs (gyms) 1 space per 200 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Religious Uses 1 space for each 3 fixed seats, or where no fixed seats
are provided, 1 space for every 35 gross sq. ft. of gross
floor area. For new building construction, 6% of
required parking spaces, rounded up to the nearest
whole number, shall be equipped with a Level 2 or
higher EV charger.
Residential Uses Parking determined pursuant to Development
Agreement, but no less than 1 space for each unit. For
new building construction, 6% of required parking
spaces, rounded up to the nearest whole number, shall
be equipped with a Level 2 or higher EV charger.
Restaurant (take out) 8 spaces per 1,000 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
.
.
Item 1 Page 2 of 6
Ordinance No. 1300
Page 3 of 6
_______________________
Table 17.56.060(B)
Minimum Number of Required Automobile Parking Spaces1
Use Type Required Spaces
Restaurant (sit down) 1 space per 100 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Retail (less than 25,000 sq.
ft.) and Multiple Tenant Retail
1 space per 250 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Retail (25,000 sq. ft. or
greater) - Single Tenant Only
1 space per 250 sq. ft. for the first 25,000 sq. ft. of gross
floor area and then 1 space per each additional 500 sq.
ft. of gross floor area For new building construction, 6%
of required parking spaces, rounded up to the nearest
whole number, shall be equipped with a Level 2 or
higher EV charger.
Studios (dance, etc.) 1 space per 200 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Trade Schools 1 space per 50 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Truck Terminals and Freight
Terminals
Parking shall be provided as determined by a parking
study prepared for the specific use. For new building
construction, 6% of required parking spaces, rounded
up to the nearest whole number, shall be equipped with
a Level 2 or higher EV charger.
Warehouse Use, General 1 space per 1,000 sq. ft. of gross floor area. For new
building construction, 6% of required parking spaces,
rounded up to the nearest whole number, shall be
equipped with a Level 2 or higher EV charger.
Warehouse Use, Cold
Storage
1 space per 1,000 sq. ft. of gross floor area for the first
50,000 sq. ft., and 1 space per 5,000 sq. ft. of gross
floor area above 50,000 sq. ft. For new building
construction, 6% of required parking spaces, rounded
up to the nearest whole number, shall be equipped with
a Level 2 or higher EV charger.
.
.
Item 1 Page 3 of 6
Ordinance No. 1300
Page 4 of 6
_______________________
SECTION 4. Table 17.56.060(C) in Section 17.56.060 of the Vernon Municipal
Code is hereby amended to read as follows:
Table 17.56.060(C)
Minimum Required Truck Loading Spaces
Use Type Required Spaces
Industrial Use, Warehouse Use, Industrial Gas
Manufacturing (including floor area used for
ancillary and incidental uses)
1 space per 10,000 sq. ft. of gross
floor area
Cold Storage Warehouses 1 space per 7,500 sq. ft. of gross
floor area
Data Centers 1 space per data center
Commercial Use and Retail Use Loading shall be provided as
determined by a parking study
prepared for the specific use
SECTION 5. Table 17.57.020(B) in Section 17.57.020 of the Vernon Municipal
Code is hereby amended to read as follows:
Table 17.57.020(B)
Spaces Required for Retail, Industrial, and Institutional Uses
Land Use Spaces Required
Primarily Retail Uses
Goods Sales 1.7 / KSF
Production Retail 0.7 / KSF
Restaurant 5.0 / KSF
Market 1.9 / KSF
Art Galleries 0.7 / KSF
Nightlife 5.0 / KSF
Personal Services 3.0 / KSF
Big Box Retail Parking study required
Drive-Through Retail Requirement of underlying use
Adult or Sexually Oriented Businesses 5.0 / KSF
Primarily Production / Industrial Uses
Artisan Industrial 0.7 / KSF
.
.
Item 1 Page 4 of 6
Ordinance No. 1300
Page 5 of 6
_______________________
Table 17.57.020(B)
Spaces Required for Retail, Industrial, and Institutional Uses
Land Use Spaces Required
Light Industrial 0.6 / KSF
Data Centers 1.0/7.5 KSF
Primarily Civic / Institutional Uses
Community Facilities 1.0 / KSF
Trade School 0.3 per anticipated student
Religious Use 0.2 per seat or 5.0 / KSF, whichever is less
SECTION 6. Any provision of the Vernon Municipal Code or appendices thereto
inconsistent with the provisions of this ordinance, to the extent of such inconsistencies
and no further, is repealed or modified to that extent necessary to affect the provisions of
this ordinance.
SECTION 7. If any section, subsection, paragraph, sentence, clause, phrase, or
portion thereof, of this ordinance is declared by a court of competent jurisdiction to be
unconstitutional or otherwise invalid, such decision shall not affect the validity of the
remaining portions of this ordinance. The City Council declares that it would have adopted
this ordinance, and each section, subsection, paragraph, sentence, clause, phrase, or
portion thereof, irrespective of the fact that any one or more sections, subsections,
paragraphs, sentences, clauses, phrases, or portions thereof, be declared invalid or
unconstitutional. To this end, the provisions of this ordinance are declared to be
severable.
SECTION 8. The Deputy City Clerk shall certify the adoption and publish this
ordinance as required by law.
/ / /
/ / /
/ / /
/ / /
.
.
Item 1 Page 5 of 6
Ordinance No. 1300
Page 6 of 6
_______________________
SECTION 9. This ordinance shall become effective after the thirtieth day following
its adoption.
APPROVED AND ADOPTED _________________, 2024.
CRYSTAL LARIOS, Mayor
ATTEST:
Yonnie Parker, Deputy City Clerk
(seal)
APPROVED AS TO FORM:
ZAYNAH N. MOUSSA, City Attorney
.
.
Item 1 Page 6 of 6
NOTICE OF CITY COUNCIL PUBLIC HEARING
The City Council of the City of Vernon will conduct a public hearing on April 16, 2024, at 9:00
a.m. (or as soon thereafter as the matter can be heard) which you may attend at Vernon City
Hall, City Council Chamber, 4305 Santa Fe Avenue, Vernon, CA 90058 to:
CONSIDER INTRODUCTION AND ADOPTION OF AN ORDINANCE
AMENDING VERNON MUNICIPAL CODE SECTION 17.56.060 AS IT
RELATES TO STANDARDS AND REQUIREMENTS FOR AUTOMOBILE
PARKING AND TRUCK LOADING.
All relevant documents will be available for public review on the City’s website once the
agenda for the meeting is posted or from the City Clerk at CityClerk@cityofvernon.org or
(323) 583-8811, ext. 546. All interested persons will be given an opportunity to comment
on the above-referenced items during the public hearing. In addition, written comments
or questions may be submitted prior to the hearing as set forth below. Written Testimony
or questions must be received prior to 9:00 a.m. on the date of the hearing.
Please send your comments or questions to:
Daniel Wall, Director of Public Works
City of Vernon
4305 Santa Fe Avenue, Vernon, CA 90058
(323) 583-8811, ext. 305 Email: dwall@cityofvernon.org
If you challenge the adoption of said ordinance or any provision thereof in court, you may
be limited to raising only those issues you or someone else raised at the hearing
described in this notice or in written correspondence delivered to the City of Vernon at, or
prior to, the meeting.
In compliance with the Americans with Disabilities Act (ADA), if you need special assistance
to participate in the meeting, please contact the City Clerk Department at (323) 583-8811, ext.
546 at least 48 hours prior to the meeting to assure arrangements can be made.
The hearing may be continued, adjourned, or cancelled and rescheduled to a stated time
and place without further notice of a public hearing.
Dated: March 27, 2024 Yonnie Parker, Deputy City Clerk
Publish: April 4, 2024
.
.
Item 1 Page 1 of 2
CALIFORNIA NEWSPAPER SERVICE BUREAU
PRE#
D A I L Y J O U R N A L C O R P O R A T I O N
To the right is a copy of the notice you sent to us for publication in the
HUNTINGTON PARK BULLETIN. Please read this notice carefully and call us
with any corrections. The Proof of Publication will be filed with the County
Clerk, if required, and mailed to you after the last date below. Publication
date(s) for this notice is (are):
Mailing Address : 915 E FIRST ST, LOS ANGELES, CA 90012
Telephone (800) 788-7840 / Fax (800) 464-2839
Visit us @ www.LegalAdstore.com
Yonnie Parker
CITY OF VERNON CITY CLERK
4305 SANTA FE AVE
VERNON, CA 90058
HRG NOTICE OF HEARING
Notice of Public Hearing - Standards and Requirements for Automobile
Parking and Truck Loading
04/04/2024
Notice Type:
Ad Description
COPY OF NOTICE
3798311
!A000006724834!
An invoice will be sent after the last date of publication. If you prepaid this
order in full, you will not receive an invoice.
NOTICE OF CITY COUNCIL PUBLIC HEARING
The City Council of the City of Vernon will
conduct a public hearing on April 16,2024,at
9:00 a.m.(or as soon thereafter as the matter can
be heard)which you may attend at Vernon City
Hall,City Council Chamber,4305 Santa Fe
Avenue,Vernon,CA 90058 to:
Consider introduction and adoption of an
ordinance amending Vernon Municipal Code
Section 17.56.060 as it relates to standards
and requirements for automobile parking and
truck loading.
All relevant documents will be available for public
review on the City's website once the agenda for
the meeting is posted or from the City Clerk at
CityClerk@cityofvernon.org or (323)583-8811,
ext.546.All interested persons will be given an
opportunity to comment on the above-referenced
items during the public hearing.In addition,
written comments or questions may be submitted
prior to the hearing as set forth below.Written
Testimony or questions must be received prior to
9:00 a.m.on the date of the hearing.
Please send your comments or questions to:
Daniel Wall,Director of Public Works
City of Vernon
4305 Santa Fe Avenue,Vernon,CA 90058
(323)583-8811,ext.305 Email:
dwall@cityofvernon.org
If you challenge the adoption of said ordinance or
any provision thereof in court,you may be limited
to raising only those issues you or someone else
raised at the hearing described in this notice or in
written correspondence delivered to the City of
Vernon at,or prior to,the meeting.
In compliance with the Americans with Disabilities
Act (ADA),if you need special assistance to
participate in the meeting,please contact the City
Clerk Department at (323)583-8811,ext.546 at
least 48 hours prior to the meeting to assure
arrangements can be made.
The hearing may be continued,adjourned,or
cancelled and rescheduled to a stated time and
place without further notice of a public hearing.
Dated:March 27,2024
Yonnie Parker,Deputy City Clerk
Publish:April 4,2024
4/4/24
PRE-3798311#
HUNTINGTON PARK BULLETIN
.
.
Item 1 Page 2 of 2
City Council Agenda Report
Meeting Date:April 16, 2024
From:Yonnie Parker, Deputy City Clerk
Department:City Clerk
Submitted by:Sandra Dolson, Administrative Secretary
Subject
Meeting Minutes
Recommendation
Approve the April 2, 2024 Regular City Council Meeting Minutes.
Background
Staff has prepared and submits the minutes for approval.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. April 2, 2024 Regular City Council Meeting Minutes
.
.
Item 2 Page 1 of 1
MINUTES
VERNON CITY COUNCIL
REGULAR MEETING
TUESDAY, APRIL 2, 2024
COUNCIL CHAMBER, 4305 SANTA FE AVENUE
CALL TO ORDER
Mayor Larios called the meeting to order at 9:00 a.m.
FLAG SALUTE
The Vernon Police Department Honor Guard presented the colors and led the Flag
Salute.
ROLL CALL
PRESENT:
Crystal Larios, Mayor
Melissa Ybarra, Council Member
Jesus Rivera, Council Member
ABSENT:
Judith Merlo, Mayor Pro Tem
Leticia Lopez, Council Member
STAFF PRESENT:
Angela Kimmey, Deputy City Administrator
Zaynah Moussa, City Attorney
Yonnie Parker, Deputy City Clerk
Jessica Alcaraz, Financial Services Administrator
Fredrick Agyin, Health and Environmental Control Director
Michael Earl, Human Resources Director
Robert Sousa, Police Chief
Manny Garcia, Public Works Deputy Director
Todd Dusenberry, Public Utilities General Manager
Diana Figueroa, City Administration Management Analyst
APPROVAL OF THE AGENDA
MOTION
Council Member Ybarra moved and Council Member Rivera seconded a motion to
approve the agenda. The question was called and the motion carried unanimously,
Mayor Pro Tem Merlo and Council Member Lopez absent.
PUBLIC COMMENT
None.
.
.
Item 2 Page 1 of 5
Regular City Council Meeting Minutes Page 2 of 5
April 2, 2024
PRESENTATIONS
1. Swearing-In Ceremony for New Police Officers in the Police Department
Deputy City Clerk Parker administered the Oath of Office to Police Officers Kevin
Caballero and Rafael Sepulveda.
2. Presentation of the Police Department’s 2023 Police Officer and Employee
of the Year Awards
Police Department Chief Sousa presented the staff report and Council recognized
the 2023 Officer of the Year Award, Police Officer, Teresa Flores and Employee
of the Year Award recipient, Police Lead Dispatcher, Cerissa Diaz.
3. Sexual Assault Awareness Month and Denim Day
Deputy City Clerk Parker read the proclamation and Council Proclaimed April 2024
as Sexual Assault Awareness Month and April 24, 2024 as Denim Day in the City
of Vernon.
4. City Administrator Report
Deputy City Administrator Kimmey presented a PowerPoint and provided
information on various topics including New Business Welcome, Graffiti Hotline,
Vernon Police E-Bike Team, Police Officer Body-Worn Cameras, Well 22
Construction Project, Community Partner Engagement, Business and Community
Events.
PUBLIC HEARINGS
5. General Fee Schedule for Fiscal Year 2024-25
Financial Services Administrator Alcaraz presented the staff report.
Mayor Larios opened the public hearing. There being no other speakers, Mayor
Larios closed the public hearing.
Financial Services Administrator Alcaraz answered questions related to Los
Angeles County Fire Department fees.
MOTION
Council Member Ybarra moved and Council Member Rivera seconded a motion to
adopt Resolution No. 2024-04 authorizing and adopting the General Fee Schedule
for Fiscal Year 2024-25. The question was called and the motion carried
unanimously, Mayor Pro Tem Merlo and Council Member Lopez absent.
.
.
Item 2 Page 2 of 5
Regular City Council Meeting Minutes Page 3 of 5
April 2, 2024
CONSENT CALENDAR
MOTION
Council Member Ybarra moved and Council Member Rivera seconded a motion to
approve the Consent Calendar. The question was called and the motion carried
unanimously, Mayor Pro Tem Merlo and Council Member Lopez absent.
The Consent Calendar consisted of the following items:
6. Meeting Minutes
Recommendation: Approve the March 19, 2024 Regular City Council Meeting
Minutes.
7. Warehouse Development Agreement for 5764 Alcoa Avenue
Recommendation: Conduct second reading and adopt Ordinance No. 1299
approving Warehouse Development Agreement No. WH-001 for Assessor Parcel
Numbers 6310-005-003, 6310-005-004, 6310-005-009, and 6310-005-010
between the City of Vernon and GPT Vernon Owner, LP.
8. Revised Job Description
Recommendation: Approve revised job description for Engineering Aide.
9. Public Works Department Monthly Report
Recommendation: Receive and file the February 2024 Building Report.
10. Quarterly City Housing Report
Recommendation: Receive and file the 2024 First Quarter City Housing Report.
11. Amendment No. 1 to Services Agreement with Hill Brothers Chemical
Company
Recommendation: A. Approve and authorize the City Administrator to execute
Amendment No. 1 to the Services Agreement with Hill Brothers Chemical
Company, in substantially the same form as submitted, to increase the contract by
an additional $87,300; and B. Authorize a contingency amount of ten percent
(10%) or $8,730 in the event of price volatility or other unforeseen market events
and grant the City Administrator authority to amend the contract value up to the
contingency amount, if necessary.
12. Amendment No. 1 to Labor and Materials Contract with Matheson Tri-Gas,
Inc.
Recommendation: Approve and authorize the City Administrator to execute
Amendment No. 1 to the Labor and Materials Contract with Matheson Tri-Gas,
Inc., in substantially the same form as submitted, to increase the contract by an
additional $90,000.
13. Operating Account Warrant Register
Recommendation: Approve Operating Account Warrant Register No. 127, for the
period of February 18 through March 2, 2024, totaling $9,844,833.40 and
consisting of ratification of electronic payments totaling $9,763,826.12 and
ratification of the issuance of early checks totaling $81,007.28.
.
.
Item 2 Page 3 of 5
Regular City Council Meeting Minutes Page 4 of 5
April 2, 2024
NEW BUSINESS
14. Amendment No. 1 to the Southeast Rio Vista Family YMCA Services
Agreement
Deputy City Administrator Kimmey presented the staff report.
City Administration Management Analyst Figueroa answered questions related to
the number of participants and outreach methods.
MOTION
Council Member Ybarra moved and Council Member Rivera seconded a motion
to: A. Find that Amendment No. 1 to the Services Agreement with Southeast Rio
Vista Family YMCA is exempt from the competitive bidding and selection process
pursuant to Vernon Municipal Code Section 3.32.110(B)(3) where the best
interests of the City are served by a direct award; B. Approve and authorize the
City Administrator to execute Amendment No. 1 to the Services Agreement with
Southeast Rio Vista Family YMCA for wellness programming memberships and
wear and tear of YMCA facilities, equipment, and supplies, in substantially the
same form as submitted, increasing the contract amount by $120,000 for a total
not-to-exceed contract amount of $220,000 for the term of the Agreement; and C.
Approve a contribution to the Southeast Rio Vista Family YMCA to sponsor
uniforms for local non-Vernon resident youth for one full year of participation in the
organization’s sports recreation programs for an amount not-to-exceed $10,000 to
be paid by the City on a reimbursement basis. The question was called and the
motion carried unanimously, Mayor Pro Tem Merlo and Council Member Lopez
absent.
15. Contract with Southland Roofing Inc. for City Hall Roof Replacement -
Contract No. 20240038
Public Works Deputy Director Garcia presented the staff report.
MOTION
Council Member Rivera moved and Council Member Ybarra seconded a motion
to: A. Find that the proposed action is categorically exempt from California
Environmental Quality Act (CEQA) review, in accordance with CEQA Guidelines §
15301, because the project consists of the repair and maintenance of the existing
City Hall Roof and involves negligible or no expansion of an existing use; B. Accept
the bid proposal from Southland Roofing Inc. as the lowest responsive and
responsible bidder and reject all other bids; C. Approve and authorize the City
Administrator to execute a contract with Southland Roofing Inc, in substantially the
same form as submitted, for the City Hall Roof Replacement Project in an amount
not-to-exceed $411,500; and D. Authorize a contingency amount of ten percent
(10%) or $41,150 in the event of an unexpected changed condition in the project
and grant authority to the City Administrator to issue change orders for an amount
up to the contingency amount, if necessary. The question was called and the .
.
Item 2 Page 4 of 5
Regular City Council Meeting Minutes Page 5 of 5
April 2, 2024
motion carried unanimously, Mayor Pro Tem Merlo and Council Member Lopez
absent.
ORAL REPORTS
16. City Administrator Reports on Activities and Other Announcements.
City Administrator Kimmey expressed condolences on the active-duty death of
LACO Fire Fighter Jonathan Van Oeffelen and announced a memorial service on
Monday April 8 from 9:00 am -11:00 am at Station 52 on Santa Fe.
17. City Council Reports on Activities (including AB 1234), Announcements, or
Directives to Staff.
None.
ADJOURNMENT
Mayor Larios adjourned the meeting at 9:36 a.m.
______________________________
CRYSTAL LARIOS, Mayor
ATTEST:
______________________________
YONNIE PARKER, Deputy City Clerk
(seal)
.
.
Item 2 Page 5 of 5
City Council Agenda Report
Meeting Date:April 16, 2024
From:Yonnie Parker, Deputy City Clerk
Department:City Clerk
Submitted by:Sandra Dolson, Administrative Secretary
Subject
Claims Against the City
Recommendation
Receive and file the claim submitted by Kevin Yee.
Background
The City received the following claim and, pursuant to Municipal Code Section 2.32.040, the
claim is being presented to the City Council as soon after filing as possible:
Name of the Claimant Amount Demanded Date Received
Kevin Yee $975.18 March 20, 2024
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Kevin Yee Claim
.
.
Item 3 Page 1 of 1
.
.
Item 3 Page 1 of 12
.
.
Item 3 Page 2 of 12
.
.
Item 3 Page 3 of 12
.
.
Item 3 Page 4 of 12
.
.
Item 3 Page 5 of 12
.
.
Item 3 Page 6 of 12
.
.
Item 3 Page 7 of 12
.
.
Item 3 Page 8 of 12
.
.
Item 3 Page 9 of 12
.
.
Item 3 Page 10 of 12
.
.
Item 3 Page 11 of 12
.
.
Item 3 Page 12 of 12
City Council Agenda Report
Meeting Date:April 16, 2024
From:Jessica Alcaraz, Financial Services Administrator
Department:Finance
Submitted by:John Lau, Accountant
Subject
Operating Account Warrant Register
Recommendation
Approve Operating Account Warrant Register No. 128, for the period of March 3 through March
16, 2024, totaling $9,717,202.88 and consisting of ratification of electronic payments totaling
$9,235,499.76 and ratification of the issuance of early checks totaling $481,703.12.
Background
Vernon Municipal Code Section 2.32.060 indicates the City Treasurer, or an authorized
designee, shall prepare warrants covering claims or demands against the City which are to be
presented to City Council for its audit and approval.
Pursuant to the aforementioned code section, the Deputy City Treasurer has prepared Operating
Account Warrant Register No. 128 covering claims and demands presented during the period of
March 3 through March 16, 2024, drawn, or to be drawn, from East West Bank for City Council
approval.
Fiscal Impact
The fiscal impact of approving Operating Account Warrant Register No. 128, totals
$9,717,202.88. The Finance Department has determined that sufficient funds to pay such
claims/demands, are available in the respective accounts referenced on Operating Account
Warrant Register No. 128.
Attachments
1. Operating Account Warrant Register No. 128
.
.
Item 4 Page 1 of 1
STAFF REPORT
FINANCE/TREASURY DEPARTMENT
DATE: April 09, 2024
TO: Honorable Mayor and City Council
FROM: Joaquin Leon, Deputy City Treasurer
RE: Operating Account Warrant Register for City Council Agenda of April 16, 2024
It is recommended that the attached Operating Account Warrant Register No. 128 be approved at the City Council meeting of April 16,
2024.
Operating Account Warrant Register No. 128 totals $9,717,202.88, and covers claims and demands presented for March 03, 2024 to
March 16, 2024, drawn or to be drawn, from East West Bank.
The following list details the components of Operating Account Warrant Register No. 128:
1. Ratification of electronic payments totaling $9,235,499.76.
2. Ratification of the issuance of early checks totaling $481,703.12.
.
.
Item 4 Page 1 of 52
OPERATING ACCOUNT WARRANT REGISTER
City of Vernon
No.128
I hereby Certify: that claims or demands covered by the This is to certify that the claims or demands
above listed warrants have been audited as to accuracy covered by the above listed warrants have been
and availability of funds for payments thereof; and that audited by the City Council of the City of Vernon
said claims or demands are accurate and that funds are and that all of said warrants are approved for pay-
available for payments thereof.ments except Warrant Numbers:
Joaquin Leon DATE
Deputy City Treasurer
DATE
Date:
Page 1 of 1 Operating Account Warrant Register Cover - 128 : Warrant
.
.
Item 4 Page 2 of 52
481,703.12
3/7/2024 9,910.22
Invoice Description Account PO or Contract Line Item Amount
21086683 BAN 9391053026 PERIOD 12/10/23-1/9/24 011-010-110-526010 20230186 58.50
Invoice Total: 58.50
21086684 BAN 9391053027 PERIOD 12/10/23-1/9/24 055-050-580-526010 20230186 330.33
Invoice Total: 330.33
21086685 BAN 9391053028 PERIOD 12/10/23-1/9/24 011-010-110-526010 20230186 1,978.79
Invoice Total: 1,978.79
21086686 BAN 9391053029 PERIOD 12/10/23-1/9/24 011-010-110-526010 20230186 1,466.31
Invoice Total: 1,466.31
21086687 BAN 9391053030 PERIOD 12/10/23-1/9/24 056-060-600-526010 20230186 844.04
Invoice Total: 844.04
21086786 BAN 9391055763 PERIOD 12/10/23-1/9/24 056-060-600-526010 20230186 29.25
Invoice Total: 29.25
21087118 BAN 9391060354 PERIOD 12/10/23-1/9/24 011-010-110-526010 20230186 258.95
Invoice Total: 258.95
21128128 BAN 9391053440 PERIOD 12/15/23-1/14/24 011-010-110-526010 20230186 29.31
Invoice Total: 29.31
21220122 BAN 9391054023 PERIOD 1/6/24-2/5/24 011-010-110-526010 20230186 29.34
Invoice Total: 29.34
21233914 BAN 9391053026 PERIOD 1/10-2/9/24 011-010-110-526010 20230186 58.68
Invoice Total: 58.68
21233915 BAN 9391053027 PERIOD 1/10-2/9/24 055-050-580-526010 20230186 331.34
Invoice Total: 331.34
21233916 BAN 9391053028 PERIOD 1/10-2/9/24 011-010-110-526010 20230186 1,916.86
Invoice Total: 1,916.86
21233917 BAN 9391053029 PERIOD 1/10-2/9/24 011-010-110-526010 20230186 1,443.56
Invoice Total: 1,443.56
21233918 BAN 9391053030 PERIOD 1/10-2/9/24 056-060-600-526010 20230186 846.55
Invoice Total: 846.55
EARLY CHECKS TOTAL:
VENDOR - 1948 - AT&T PAYMENT # 612453
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Page 1 of 50
.
.
Item 4 Page 3 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
21234017 BAN 9391055763 PERIOD 1/10-2/9/24 056-060-600-526010 20230186 29.34
Invoice Total: 29.34
21234349 BAN 9391060354 PERIOD 1/10-2/9/24 011-010-110-526010 20230186 259.07
Invoice Total: 259.07
3/7/2024 4,539.11
Invoice Description Account PO or Contract Line Item Amount
2069916806 ACCT 831-000-9006 723 PERIOD 12/19/23-
1/18/24
011-010-110-526010 20230186 1,962.40
Invoice Total: 1,962.40
3146166690 ACCT 8002-996-5433 PERIOD 1/19-2/18/23 011-010-110-526010 20230186 331.84
Invoice Total: 331.84
3147109265 ACCT 8002-996-5433 PERIOD 2/19-3/18/23 011-010-110-526010 20230186 331.84
Invoice Total: 331.84
3148053628 ACCT 8002-996-5433 PERIOD 3/19-4/18/23 011-010-110-526010 20230186 331.84
Invoice Total: 331.84
3148945264 ACCT 8002-996-5433 PERIOD 4/19-5/18/23 011-010-110-526010 20230186 322.82
Invoice Total: 322.82
3149617867 ACCT 8002-996-5433 PERIOD 5/19-6/18/23 011-010-110-526010 20230186 322.82
Invoice Total: 322.82
425519701 ACCT 831-000-0922 427 PERIOD 4/19-5/18/23 055-050-580-526010 20230186 152.00
Invoice Total: 152.00
5845639709 ACCT 831-000-0922 427 PERIOD 5/19-6/18/23 055-050-580-526010 20230186 152.00
Invoice Total: 152.00
6779820802 ACCT 831-000-0922 427 PERIOD 6/19-7/18/23 055-050-580-526010 20230186 152.00
Invoice Total: 152.00
6857265805 ACCT 831-001-3015 328 PERIOD 1/17-2/16/24 011-010-110-526010 20230186 327.55
Invoice Total: 327.55
7516805809 ACCT 831-000-0922 427 PERIOD 11/19-
12/18/23
055-050-580-526010 20230186 152.00
VENDOR - 1948 - AT&T PAYMENT # 612454
Page 2 of 50
.
.
Item 4 Page 4 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 152.00
3/7/2024 46.23
Invoice Description Account PO or Contract Line Item Amount
832176480X011
62024
ACCT 832176480 PERIOD 12/9/23-1/8/24 011-010-110-526010 46.23
Invoice Total: 46.23
3/7/2024 25,693.61
Invoice Description Account PO or Contract Line Item Amount
022124 COMMERCIAL EV CHARGER INCENTIVE
PROGRAM
056-060-605-529702 25,693.61
Invoice Total: 25,693.61
3/7/2024 4,437.32
Invoice Description Account PO or Contract Line Item Amount
5359 VEHICLE REPAIR 011-030-300-527000 240364 600.00
5359 VEHICLE REPAIR 011-030-300-527000 240364 508.53
5359 VEHICLE REPAIR 011-030-300-527000 240364 462.53
5359 VEHICLE REPAIR 011-030-300-527000 240364 47.27
5359 VEHICLE REPAIR 011-030-300-527000 240364 47.28
5359 VEHICLE REPAIR 011-030-300-527000 240364 704.72
5359 VEHICLE REPAIR 011-030-300-527000 240364 176.18
5359 VEHICLE REPAIR 011-030-300-527000 240364 176.18
5359 VEHICLE REPAIR 011-030-300-527000 240364 671.40
5359 VEHICLE REPAIR 011-030-300-527000 240364 85.92
Invoice Total: 3,480.01
5402 VEHICLE REPAIR 011-030-300-527000 240352 200.00
5402 VEHICLE REPAIR 011-030-300-527000 240352 671.40
5402 VEHICLE REPAIR 011-030-300-527000 240352 85.91
Invoice Total: 957.31
3/7/2024 11,258.02VENDOR - 5078 - BURKE, WILLIAMS & SORENSEN, LLP PAYMENT # 612458
VENDOR - 2889 - AT&T MOBILITY PAYMENT # 612455
VENDOR - 2740 - BAKER COMMODITIES, INC PAYMENT # 612456
VENDOR - 5366 - BLACK & WHITE EMERGENCY VEHICLES,
LLC
PAYMENT # 612457
Page 3 of 50
.
.
Item 4 Page 5 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
316378 LEGAL SERVICES 011-010-115-529200 LD-0044-1 1,075.00
Invoice Total: 1,075.00
316379 LEGAL SERVICES 011-010-115-529200 LD-0044-1 4,975.00
Invoice Total: 4,975.00
316381 LEGAL SERVICES 011-010-115-529200 LD-0044-1 2,201.02
Invoice Total: 2,201.02
316383 LEGAL SERVICES 011-010-115-529200 LD-0044-1 374.00
Invoice Total: 374.00
316387 LEGAL SERVICES 011-010-115-529200 LD-0044-1 127.00
Invoice Total: 127.00
316388 LEGAL SERVICES 011-010-115-529200 LD-0044-1 1,986.00
Invoice Total: 1,986.00
316389 LEGAL SERVICES 011-010-115-529200 LD-0044-1 520.00
Invoice Total: 520.00
3/7/2024 30.00
Invoice Description Account PO or Contract Line Item Amount
3142 SHOOTING RANGE FEES 011-030-300-529220 240062 30.00
Invoice Total: 30.00
3/7/2024 1,240.06
Invoice Description Account PO or Contract Line Item Amount
96092566 CONCRETE 011-040-430-522000 20240026 1,240.06
Invoice Total: 1,240.06
3/7/2024 241.63
Invoice Description Account PO or Contract Line Item Amount
40347 AUTO PARTS 011-040-420-522000 240016 241.63
Invoice Total: 241.63
3/7/2024 2,061.00
VENDOR - 4163 - CENTRAL FORD AUTOMOTIVE, INC. PAYMENT # 612461
VENDOR - 7372 - CHARTER COMMUNICATIONS HOLDINGS,
LLC
PAYMENT # 612462
VENDOR - 446 - BURRO CANYON ENTERPRISE, INC. PAYMENT # 612459
VENDOR - 256 - CALPORTLAND COMPANY PAYMENT # 612460
Page 4 of 50
.
.
Item 4 Page 6 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
180582 JOINT POLE 055-050-585-529215 2,061.00
Invoice Total: 2,061.00
3/7/2024 52.00
Invoice Description Account PO or Contract Line Item Amount
021924 LIVE SCAN REIMBURSEMENT 011-010-120-529215 52.00
Invoice Total: 52.00
3/7/2024 2,701.00
Invoice Description Account PO or Contract Line Item Amount
2301679VER01 WATER SAMPLES/ANALYSIS 058-070-700-529225 LP-0634 738.00
Invoice Total: 738.00
2301948VER01 WATER SAMPLES/ANALYSIS 058-070-700-529225 LP-0634 1,268.50
Invoice Total: 1,268.50
2400142VER01 WATER SAMPLE ANALYSIS 058-070-700-529225 LP-0634 694.50
Invoice Total: 694.50
3/7/2024 2,168.97
Invoice Description Account PO or Contract Line Item Amount
282184 MISC PARTS FOR WELL 20 (GATE
OPERATOR)
058-070-700-660000 240024 1,049.56
Invoice Total: 1,049.56
282185 MISC PARTS FOR WELL 20 (ELEC GATE) 058-070-700-660000 240024 329.69
Invoice Total: 329.69
282596 PARTS & SUPPLIES 011-040-415-522000 240141 108.05
Invoice Total: 108.05
282597 PARTS & SUPPLIES 011-040-415-522000 240141 597.83
Invoice Total: 597.83
282804 PARTS & SUPPLIES 011-040-415-522000 240141 27.71
VENDOR - 7767 - CHRISTIAN HERRERA PAYMENT # 612463
VENDOR - 3088 - CLINICAL LAB OF SAN BERNARDINO INC. PAYMENT # 612464
VENDOR - 1336 - CURRENT WHOLESALE ELECTRIC
SUPPLY
PAYMENT # 612465
Page 5 of 50
.
.
Item 4 Page 7 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 27.71
282805 PARTS & SUPPLIES 011-040-415-522000 240141 27.07
Invoice Total: 27.07
282806 PARTS & SUPPLIES 011-040-415-522000 240141 29.06
Invoice Total: 29.06
3/7/2024 370.00
Invoice Description Account PO or Contract Line Item Amount
EB177561 BLOWER FAN 055-050-586-529000- 20240040 370.00
Invoice Total: 370.00
3/7/2024 150.04
Invoice Description Account PO or Contract Line Item Amount
5040111 SAFETY EYE GLASSES 058-070-700-524000 150.04
Invoice Total: 150.04
3/7/2024 1,835.35
Invoice Description Account PO or Contract Line Item Amount
BD0019114 OQ RENEWAL 056-060-600-529225 1,835.35
Invoice Total: 1,835.35
3/7/2024 14,958.84
Invoice Description Account PO or Contract Line Item Amount
IN84763 FILTER HOUSING INSTALLATION 055-050-586-529005- 20240231 14,958.84
Invoice Total: 14,958.84
3/7/2024 33,467.00
Invoice Description Account PO or Contract Line Item Amount
50364D01 DECEMBER OUTAGE INSULATION 055-050-586-529005- 20240205 33,467.00
Invoice Total: 33,467.00
3/7/2024 39,452.62VENDOR - 7630 - FORNEY CORPORATION PAYMENT # 612471
VENDOR - 5593 - EMPIRE OPTICAL, INC PAYMENT # 612467
VENDOR - 4762 - ENERGY WORLDNET, INC PAYMENT # 612468
VENDOR - 7707 - ETHOSENERGY US GROUP PAYMENT # 612469
VENDOR - 7291 - ELECTRONIC BALANCING COMPANY, INC PAYMENT # 612466
VENDOR - 7273 - F. D. THOMAS, INC PAYMENT # 612470
Page 6 of 50
.
.
Item 4 Page 8 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
420471 HRSG 2 DUCT BURNER 055-050-586-529000- 230427 6,500.00
420471 HRSG 2 DUCT BURNER 055-050-586-529000- 230427 32,952.62
Invoice Total: 39,452.62
3/7/2024 703.87
Invoice Description Account PO or Contract Line Item Amount
HTU2360 HARBOR TOXIC UPSTREAM COST SHARING 011-040-430-529215 20240320 703.87
Invoice Total: 703.87
3/7/2024 42,680.31
Invoice Description Account PO or Contract Line Item Amount
022124 COMMERCIAL EV CHARGER INCENTIVE
PROGRAM
056-060-605-529702 42,680.31
Invoice Total: 42,680.31
3/7/2024 275.00
Invoice Description Account PO or Contract Line Item Amount
WOI0512101 WINDSHIELD REPAIR 011-040-420-522000 240353 169.73
WOI0512101 WINDSHIELD REPAIR 011-040-420-529000 240353 105.27
Invoice Total: 275.00
3/7/2024 1,278.06
Invoice Description Account PO or Contract Line Item Amount
39336 VEHICLE REPAIR 011-040-420-522000 240284 385.56
39336 VEHICLE REPAIR 011-040-420-529000 240284 892.50
Invoice Total: 1,278.06
3/7/2024 9,676.87
Invoice Description Account PO or Contract Line Item Amount
INV118078 AQUEOUS AMMONIA 055-050-586-520235- LP-0766 9,676.87
Invoice Total: 9,676.87
VENDOR - 2208 - HILL BROTHERS CHEMICAL CO PAYMENT # 612476
VENDOR - 6584 - GT'S LIVING FOODS PAYMENT # 612473
VENDOR - 4035 - GTO AUTO GLASS PAYMENT # 612474
VENDOR - 6308 - HI TECH ENTERPRISE PAYMENT # 612475
VENDOR - 5421 - GATEWAY WATER MGMT AUTHORITY PAYMENT # 612472
Page 7 of 50
.
.
Item 4 Page 9 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/7/2024 441.24
Invoice Description Account PO or Contract Line Item Amount
202826965 OFFSITE BACKUP STORAGE 011-010-110-526010 20240021 441.24
Invoice Total: 441.24
3/7/2024 1,959.90
Invoice Description Account PO or Contract Line Item Amount
4945674 RECOGNITION AWARD PROGRAM 011-010-120-529690 240356 270.47
4945674 RECOGNITION AWARD PROGRAM 011-010-120-529690 240356 276.13
4945674 RECOGNITION AWARD PROGRAM 011-010-120-529690 240356 130.03
4945674 RECOGNITION AWARD PROGRAM 011-010-120-529690 240356 208.68
4945674 RECOGNITION AWARD PROGRAM 011-010-120-529690 240356 308.74
4945674 RECOGNITION AWARD PROGRAM 011-010-120-529690 240356 461.01
4945674 RECOGNITION AWARD PROGRAM 011-010-120-529690 240356 304.84
Invoice Total: 1,959.90
3/7/2024 969.75
Invoice Description Account PO or Contract Line Item Amount
1153 CYBER SECURITY CONSULTING SERVICES 011-010-110-529110 20230187 969.75
Invoice Total: 969.75
3/7/2024 400.00
Invoice Description Account PO or Contract Line Item Amount
1169 CYBER SECURITY CONSULTING SERVICES 011-010-110-529110 20230187 400.00
Invoice Total: 400.00
3/7/2024 4,540.00
Invoice Description Account PO or Contract Line Item Amount
K1230102 PROFESSIONAL SERVICES (SEWC) -
JANUARY 2024
095-095-905-705000- 20240262 4,540.00
VENDOR - 7542 - KNC STRATEGIC SERVICES CORP PAYMENT # 612480
VENDOR - 7542 - KNC STRATEGIC SERVICES CORP PAYMENT # 612481
VENDOR - 7742 - KOA CONSULTING, INC PAYMENT # 612482
VENDOR - 829 - IRON MOUNTAIN, INC PAYMENT # 612478
VENDOR - 1221 - JIM HERNDON & ASSOCIATES, INC. PAYMENT # 612479
Page 8 of 50
.
.
Item 4 Page 10 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 4,540.00
3/7/2024 4,540.00
Invoice Description Account PO or Contract Line Item Amount
K1230103 PROFESSIONAL SERVICES (SEWC) -
FEBRUARY 2024
095-095-905-705000- 20240262 4,540.00
Invoice Total: 4,540.00
3/7/2024 50.00
Invoice Description Account PO or Contract Line Item Amount
24ASRE139 PARCEL MANAGEMENT SYSTEM PERIOD
1/1-1/31/24
011-010-110-529110 IT-0153 50.00
Invoice Total: 50.00
3/7/2024 125.50
Invoice Description Account PO or Contract Line Item Amount
022924 EXPENSE REIMBURSEMENT 055-050-580-529500 125.50
Invoice Total: 125.50
3/7/2024 5,466.53
Invoice Description Account PO or Contract Line Item Amount
77077342 HYDRAULIC TRUCK CRANE 055-050-586-660000- 20240215 5,466.53
Invoice Total: 5,466.53
3/7/2024 16,695.00
Invoice Description Account PO or Contract Line Item Amount
3114 REPAIRS & MAINTENANCE 011-040-410-529000 20230172 16,695.00
Invoice Total: 16,695.00
3/7/2024 52.00
Invoice Description Account PO or Contract Line Item Amount
022124 LIVE SCAN REIMBURSEMENT 011-010-120-529215 52.00
Invoice Total: 52.00
VENDOR - 7346 - MAXIM CRANE WORKS, LP PAYMENT # 612486
VENDOR - 6667 - MEGA RENOVATION, INC PAYMENT # 612487
VENDOR - 7766 - MELISSA SLAVOV PAYMENT # 612488
VENDOR - 7742 - KOA CONSULTING, INC PAYMENT # 612483
VENDOR - 1792 - LA COUNTY ASSESSOR OFFICE PAYMENT # 612484
VENDOR - 7158 - MARGIE OTTO PAYMENT # 612485
Page 9 of 50
.
.
Item 4 Page 11 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/7/2024 52.00
Invoice Description Account PO or Contract Line Item Amount
021624 LIVE SCAN REIMBURSEMENT 011-010-120-529215 52.00
Invoice Total: 52.00
3/7/2024 2,498.15
Invoice Description Account PO or Contract Line Item Amount
69978 PARTS & MAINTENANCE 055-050-586-529008- 240081 2,498.15
Invoice Total: 2,498.15
3/7/2024 1,977.13
Invoice Description Account PO or Contract Line Item Amount
S1289324001 PARTS & SUPPLIES 011-040-415-522000 240056 67.72
Invoice Total: 67.72
S1289867001 PARTS & SUPPLIES 011-040-415-522000 240056 557.98
Invoice Total: 557.98
S1289935001 PARTS & SUPPLIES 058-070-700-529000 240026 1,204.37
Invoice Total: 1,204.37
S1290999002 PARTS & SUPPLIES 011-040-415-522000 240056 147.06
Invoice Total: 147.06
3/7/2024 133.15
Invoice Description Account PO or Contract Line Item Amount
9523 NEW TIRES 011-040-420-522000 240013 133.15
Invoice Total: 133.15
3/7/2024 1,271.80
Invoice Description Account PO or Contract Line Item Amount
120433 LEGAL SERVICES 011-010-115-529200 20240239 1,271.80
Invoice Total: 1,271.80
VENDOR - 3908 - RAFAEL A. LOPEZ PAYMENT # 612492
VENDOR - 3725 - RICHARD D JONES, A PROFESSIONAL
LAW CORP
PAYMENT # 612493
VENDOR - 7768 - MIKEE JONES PAYMENT # 612489
VENDOR - 2316 - MITECH CONTROLS PAYMENT # 612490
VENDOR - 1943 - PLUMBING & INDUSTRIAL SUPPLY PAYMENT # 612491
Page 10 of 50
.
.
Item 4 Page 12 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/7/2024 30.93
Invoice Description Account PO or Contract Line Item Amount
300329 PARTS & SUPPLIES 011-040-430-522000 240059 30.93
Invoice Total: 30.93
3/7/2024 85.00
Invoice Description Account PO or Contract Line Item Amount
76550 FRONT AXLE & ALIGNMENT REPAIR 011-040-420-529000 240008 85.00
Invoice Total: 85.00
3/7/2024 69.39
Invoice Description Account PO or Contract Line Item Amount
INV66055 PARTS & SUPPLIES 055-050-586-529000- 240078 69.39
Invoice Total: 69.39
3/7/2024 49,000.00
Invoice Description Account PO or Contract Line Item Amount
558620997A DRY ICE CLEANING 055-050-586-529005- 20240193 22,500.00
Invoice Total: 22,500.00
558721075 INSULATION REMOVAL & INSTALLATION 055-050-586-529005- 20240235 22,010.00
Invoice Total: 22,010.00
558820997B DRY ICE CLEANING 055-050-586-529005- 20240193 4,490.00
Invoice Total: 4,490.00
3/7/2024 2,829.75
Invoice Description Account PO or Contract Line Item Amount
352132 ACUREN INSPECTION 055-050-586-529007- 20240047 2,829.75
Invoice Total: 2,829.75
3/7/2024 2,000.00
Invoice Description Account PO or Contract Line Item Amount
26933R PROFESSIONAL SERVICES 011-010-110-529210 20240203 2,000.00
VENDOR - 7275 - TOTAL-WESTERN, INC PAYMENT # 612498
VENDOR - 7626 - TRIDEN GROUP CORPORATION PAYMENT # 612499
VENDOR - 1973 - STEVEN J. BURRIS PAYMENT # 612495
VENDOR - 7406 - SUNSET INDUSTRIAL PARTS, INC PAYMENT # 612496
VENDOR - 7294 - TONY DEMARIA ELECTRIC, INC PAYMENT # 612497
VENDOR - 1845 - SECURITY PAVING COMPANY, INC PAYMENT # 612494
Page 11 of 50
.
.
Item 4 Page 13 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 2,000.00
3/7/2024 2,000.00
Invoice Description Account PO or Contract Line Item Amount
26874R PROFESSIONAL SERVICES 011-010-110-529210 20240203 2,000.00
Invoice Total: 2,000.00
3/7/2024 850.16
Invoice Description Account PO or Contract Line Item Amount
72811433 ACCT SV311478 PERIOD THRU 12/31/23 011-010-110-526010 20230084 118.08
Invoice Total: 118.08
72814675 ACCT SV646197 PERIOD THRU 12/31/23 011-010-110-526010 20230084 732.08
Invoice Total: 732.08
3/7/2024 1,328.17
Invoice Description Account PO or Contract Line Item Amount
849676229 SUBSCRIPTION CHARGES 011-010-110-529110 PD-0178 1,328.17
Invoice Total: 1,328.17
3/7/2024 1,862.69
Invoice Description Account PO or Contract Line Item Amount
I50001018184 ENVIRONMENTAL SERVICES 055-050-586-526000- 20240132 1,862.69
Invoice Total: 1,862.69
3/7/2024 4,666.48
Invoice Description Account PO or Contract Line Item Amount
5266072 MANAGED PRINT SERVICES 01/01-01/31/24 011-010-110-529110 IT-0141 2,333.24
Invoice Total: 2,333.24
5389257 MANAGED PRINT SERVICES 2/1-2/29/24 011-010-110-529110 IT-0141 2,333.24
Invoice Total: 2,333.24
VENDOR - 743 - XEROX CORPORATION PAYMENT # 612504
VENDOR - 1481 - VERIZON WIRELESS PAYMENT # 612501
VENDOR - 141 - WEST PUBLISHING CORPORATION PAYMENT # 612502
VENDOR - 2308 - WORLD OIL ENVIRONMENTAL SERVICES PAYMENT # 612503
VENDOR - 7626 - TRIDEN GROUP CORPORATION PAYMENT # 612500
Page 12 of 50
.
.
Item 4 Page 14 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/7/2024 7,939.91
Invoice Description Account PO or Contract Line Item Amount
022124 COMMERCIAL EV CHARGER INCENTIVE
PROGRAM
056-060-605-529702 7,939.91
Invoice Total: 7,939.91
3/12/2024 500.49
Invoice Description Account PO or Contract Line Item Amount
11636 GARNISHMENT FOR PAYROLL WARRANT
240307
011-000-000-210260 500.49
Invoice Total: 500.49
3/13/2024 41,500.00
Invoice Description Account PO or Contract Line Item Amount
022924 HSA QUARTERLY CONTRIBUTIONS 011-010-105-513030 1,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-010-110-513030 1,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-010-115-513030 1,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-010-120-513030 1,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-010-125-513030 1,500.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-010-130-513030 1,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-020-200-513030 2,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-030-300-513030 10,500.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-040-400-513030 2,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-040-405-513030 1,500.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-040-415-513030 500.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-040-420-513030 500.00
022924 HSA QUARTERLY CONTRIBUTIONS 011-040-430-513030 4,500.00
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-555-513030 500.00
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-570-513030 1,500.00
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-575-513030 500.00
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-580-513030 2,000.00
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-585-513030 1,500.00
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-586-513030- 3,500.00
VENDOR - 4239 - HSA BANK PAYMENT # 612507
VENDOR - 7765 - YINGHUA, LLC PAYMENT # 612505
VENDOR - 5333 - LA COUNTY SHERIFF'S DEPT. PAYMENT # 612506
Page 13 of 50
.
.
Item 4 Page 15 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-590-513030 500.00
022924 HSA QUARTERLY CONTRIBUTIONS 055-050-595-513030 500.00
022924 HSA QUARTERLY CONTRIBUTIONS 056-060-600-513030 500.00
022924 HSA QUARTERLY CONTRIBUTIONS 058-070-700-513030 2,500.00
Invoice Total: 41,500.00
3/14/2024 2,436.26
Invoice Description Account PO or Contract Line Item Amount
062022(2) ACCT 323 277-8949 504 0 PERIOD 05/20-
6/19/22
011-010-110-522010 2,436.26
Invoice Total: 2,436.26
3/14/2024 3,300.00
Invoice Description Account PO or Contract Line Item Amount
031424 RETIREE HEALTH REIMBURSEMENT 2024
1Q
011-010-120-513035 3,300.00
Invoice Total: 3,300.00
3/14/2024 572.00
Invoice Description Account PO or Contract Line Item Amount
021224 REFUND PUBLIC HEALTH PERMIT FEE 011-410-000-410240 488.00
021224 REFUND PUBLIC HEALTH PERMIT FEE 011-000-000-240020 84.00
Invoice Total: 572.00
3/14/2024 4,113.76
Invoice Description Account PO or Contract Line Item Amount
21434 INMATE BOOKINGS 02/24 011-030-300-529220 PD-0181 4,113.76
Invoice Total: 4,113.76
3/14/2024 27,162.29
Invoice Description Account PO or Contract Line Item Amount
108243CS STREET SWEEPING SERVICES 02/24 011-040-430-529000 CS-1434 27,162.29
Invoice Total: 27,162.29
VENDOR - 7755 - CARLOS JARAMILLO PAYMENT # 612510
VENDOR - 3846 - CITY OF HUNTINGTON PARK PAYMENT # 612511
VENDOR - 4860 - CLEANSTREET, LLC PAYMENT # 612512
VENDOR - 1948 - AT&T PAYMENT # 612508
VENDOR - 1442 - BRADLEY MACK PAYMENT # 612509
Page 14 of 50
.
.
Item 4 Page 16 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/14/2024 539.55
Invoice Description Account PO or Contract Line Item Amount
22361 DOOR MAINTENANCE AND REPAIR 011-040-415-529000 20240003 539.55
Invoice Total: 539.55
3/14/2024 247.42
Invoice Description Account PO or Contract Line Item Amount
125787005 AUTO PARTS 011-040-420-522000 240012 123.50
Invoice Total: 123.50
167162524 AUTO PARTS 011-040-420-522000 240012 123.92
Invoice Total: 123.92
3/14/2024 62.00
Invoice Description Account PO or Contract Line Item Amount
031224 LIVE SCAN REIMBURSEMENT 011-010-120-529215 62.00
Invoice Total: 62.00
3/14/2024 495.60
Invoice Description Account PO or Contract Line Item Amount
378083 OIL TESTING SERVICES 055-050-586-529000- 240041 126.00
Invoice Total: 126.00
380992 OIL TESTING SERVICES 055-050-586-529000- 240041 369.60
Invoice Total: 369.60
3/14/2024 519.77
Invoice Description Account PO or Contract Line Item Amount
202837098 OFFSITE BACKUP STORAGE 011-010-110-526010 20240021 519.77
Invoice Total: 519.77
3/14/2024 4,400.00
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 7404 - INSIGHT SERVICES, INC PAYMENT # 612517
VENDOR - 829 - IRON MOUNTAIN, INC PAYMENT # 612518
VENDOR - 1315 - JEFFREY GRAVES PAYMENT # 612519
VENDOR - 331 - COMMERCIAL DOOR OF LOS ANGELES
COUNTY
PAYMENT # 612513
VENDOR - 6696 - ELLIOTT AUTO SUPPLY CO, INC PAYMENT # 612514
VENDOR - 7771 - GARY PERDUE PAYMENT # 612516
Page 15 of 50
.
.
Item 4 Page 17 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
031224 RETIREE HEALTH REIMBURSEMENT
2023Q4 & 2024Q1
011-010-120-513035 4,400.00
Invoice Total: 4,400.00
3/14/2024 2,513.70
Invoice Description Account PO or Contract Line Item Amount
89151 VEHICLE DECALS - 2024 011-020-200-522000 240329 2,513.70
Invoice Total: 2,513.70
3/14/2024 300.00
Invoice Description Account PO or Contract Line Item Amount
1163 CYBER SECURITY CONSULTING SERVICES 011-010-110-529110 20230187 300.00
Invoice Total: 300.00
3/14/2024 13.16
Invoice Description Account PO or Contract Line Item Amount
11244049 TRANSLATION SERVICES 011-030-300-529220 20230162 13.16
Invoice Total: 13.16
3/14/2024 2,483.31
Invoice Description Account PO or Contract Line Item Amount
A10813 AUTO SPRINKLER TEST 011-040-415-529000 20240294 1,725.00
Invoice Total: 1,725.00
A10868 REPAIRS & MAINTENANCE 011-040-415-529000 20240293 250.00
Invoice Total: 250.00
A10959 REPAIRS & MAINTENANCE 011-040-415-529000 20240300 508.31
Invoice Total: 508.31
3/14/2024 2,408.41
Invoice Description Account PO or Contract Line Item Amount
23335 VACUUM TRUCK SERVICES 055-050-586-529000- 20240305 2,408.41
Invoice Total: 2,408.41
VENDOR - 3231 - MARX BROS FIRE EXTINGUISHER CO INC PAYMENT # 612523
VENDOR - 7280 - MESA ENVIRONMENTAL SERVICES, INC PAYMENT # 612524
VENDOR - 1832 - KENNEDY NAMEPLATE COMPANY, INC PAYMENT # 612520
VENDOR - 7542 - KNC STRATEGIC SERVICES CORP PAYMENT # 612521
VENDOR - 3272 - LANGUAGE LINE SERVICES, INC PAYMENT # 612522
Page 16 of 50
.
.
Item 4 Page 18 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/14/2024 2,963.29
Invoice Description Account PO or Contract Line Item Amount
IN4012958 MANAGED PRINT SERVICES 1/30-2/28/24 011-010-110-529110 IT-0141 2,963.29
Invoice Total: 2,963.29
3/14/2024 37.22
Invoice Description Account PO or Contract Line Item Amount
221890 AUTO PARTS 011-040-420-522000 240014 37.22
Invoice Total: 37.22
3/14/2024 50.00
Invoice Description Account PO or Contract Line Item Amount
022624 2024 FBI NCCA MEMBERSHIP DUES 011-030-300-529550 50.00
Invoice Total: 50.00
3/14/2024 1,703.00
Invoice Description Account PO or Contract Line Item Amount
030624 RETIREE HEALTH REIMBURSEMENT 2024
1Q
011-010-120-513035 1,703.00
Invoice Total: 1,703.00
3/14/2024 62.00
Invoice Description Account PO or Contract Line Item Amount
022024 LIVE SCAN REIMBURSEMENT 011-010-120-529215 62.00
Invoice Total: 62.00
3/14/2024 94.82
Invoice Description Account PO or Contract Line Item Amount
S1290834001 PARTS & SUPPLIES 058-070-700-529000 240026 94.82
Invoice Total: 94.82
VENDOR - 7769 - PAUL LOPEZ PAYMENT # 612529
VENDOR - 1943 - PLUMBING & INDUSTRIAL SUPPLY PAYMENT # 612530
VENDOR - 309 - NAPA AUTO PARTS PAYMENT # 612526
VENDOR - 7711 - FBI NATIONAL COMMAND COURSE
ASSOCIATION
PAYMENT # 612527
VENDOR - 1148 - NORMAN SUTHERLIN PAYMENT # 612528
VENDOR - 6203 - MRC SMART TECHNOLOGY SOLUTIONS PAYMENT # 612525
Page 17 of 50
.
.
Item 4 Page 19 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/14/2024 196.27
Invoice Description Account PO or Contract Line Item Amount
121038 LEGAL SERVICES 011-010-115-529200 20240239 196.27
Invoice Total: 196.27
3/14/2024 40.00
Invoice Description Account PO or Contract Line Item Amount
010124 EXPENSE REIMBURSEMENT 011-030-300-529500 40.00
Invoice Total: 40.00
3/14/2024 26,250.00
Invoice Description Account PO or Contract Line Item Amount
14139 ERP IMPLEMENTATION CONSULTANT 011-010-110-529210 FI-0034 17,062.50
Invoice Total: 17,062.50
14850 ERP IMPLEMENTATION CONSULTANT 011-010-110-529210 FI-0034 4,725.00
Invoice Total: 4,725.00
15106 ERP IMPLEMENTATION CONSULTANT 011-010-110-529210 FI-0034 4,462.50
Invoice Total: 4,462.50
3/14/2024 1,308.32
Invoice Description Account PO or Contract Line Item Amount
4239480 ANNUAL OPERATING FEES 011-040-415-529000 1,308.32
Invoice Total: 1,308.32
3/14/2024 168.37
Invoice Description Account PO or Contract Line Item Amount
4240834 EMISSIONS FEES 011-040-415-529000 168.37
Invoice Total: 168.37
3/14/2024 4,261.73
Invoice Description Account PO or Contract Line Item Amount
S1406730001 SUPPLIES 011-040-415-522000 240057 3,435.96
VENDOR - 1158 - SOUTH COAST AQMD PAYMENT # 612535
VENDOR - 6305 - STARBOARD TACK SUPPLY INC PAYMENT # 612536
VENDOR - 7389 - RUTH CEDENO PAYMENT # 612532
VENDOR - 7057 - SDI PRESENCE, LLC PAYMENT # 612533
VENDOR - 1158 - SOUTH COAST AQMD PAYMENT # 612534
VENDOR - 3725 - RICHARD D JONES, A PROFESSIONAL
LAW CORP
PAYMENT # 612531
Page 18 of 50
.
.
Item 4 Page 20 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 3,435.96
S1407599001 SUPPLIES 011-040-415-522000 240057 825.77
Invoice Total: 825.77
3/14/2024 231.93
Invoice Description Account PO or Contract Line Item Amount
76529 FRONT AXLE & ALIGNMENT REPAIR 011-040-420-522000 240008 51.93
76529 FRONT AXLE & ALIGNMENT REPAIR 011-040-420-529000 240008 180.00
Invoice Total: 231.93
3/14/2024 5,000.00
Invoice Description Account PO or Contract Line Item Amount
1344105 ENERGY RISK MANAGEMENT SERVICES
02/24
055-050-580-529215 20240255 5,000.00
Invoice Total: 5,000.00
3/14/2024 1,894.00
Invoice Description Account PO or Contract Line Item Amount
022124 PARKING REVENUE DISTRIBUTION 01/24 011-030-300-529220 1,894.00
Invoice Total: 1,894.00
3/14/2024 3,300.00
Invoice Description Account PO or Contract Line Item Amount
030724 RETIREE HEALTH REIMBURSEMENT 2024
1Q
011-010-120-513035 3,300.00
Invoice Total: 3,300.00
3/14/2024 2,000.00
Invoice Description Account PO or Contract Line Item Amount
27036R PROFESSIONAL SERVICES 011-010-110-529210 20240203 2,000.00
Invoice Total: 2,000.00
3/14/2024 3,600.00
VENDOR - 7626 - TRIDEN GROUP CORPORATION PAYMENT # 612541
VENDOR - 6619 - TYNER CONSULTING SERVICES, INC PAYMENT # 612542
VENDOR - 7743 - STONEX FINANCIAL INC. PAYMENT # 612538
VENDOR - 5419 - SUPERIOR CT OF CAL OF LA PAYMENT # 612539
VENDOR - 1625 - TODD PAINTON PAYMENT # 612540
VENDOR - 1973 - STEVEN J. BURRIS PAYMENT # 612537
Page 19 of 50
.
.
Item 4 Page 21 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
1659 JPE EVALUATION SERVICES 056-060-600-529225 20240269 3,600.00
Invoice Total: 3,600.00
3/14/2024 1,243.65
Invoice Description Account PO or Contract Line Item Amount
227483444001 EQUIPMENT & TOOL RENTALS 011-040-415-522000 20240017 1,243.65
Invoice Total: 1,243.65
3/14/2024 1,328.17
Invoice Description Account PO or Contract Line Item Amount
849824936 CLEAR PROFLEX SUBSCRIPTION 011-010-110-529110 PD-0178 1,328.17
Invoice Total: 1,328.17
3/14/2024 3,300.00
Invoice Description Account PO or Contract Line Item Amount
031324 RETIREE HEALTH REIMBURSEMENT 2024
1Q
011-010-120-513035 3,300.00
Invoice Total: 3,300.00
3/7/2024 6,040.87
Invoice Description Account PO or Contract Line Item Amount
030724 PAYROLL CHECKS 011-000-000-210110 3,376.68
030724 PAYROLL CHECKS 056-000-000-210110 2,664.19
Invoice Total: 6,040.87
VENDOR - 141 - WEST PUBLISHING CORPORATION PAYMENT # 612544
VENDOR - 892 - WILLIAM FOLTZ JR PAYMENT # 612545
VENDOR - 883 - UNITED RENTALS (NORTH AMERICA), INC PAYMENT # 612543
PAYROLL CHECKS
Page 20 of 50
.
.
Item 4 Page 22 of 52
9,235,499.76
3/8/2024 442,432.32
Invoice Description Account PO or Contract Line Item Amount
2024030531633
01572
REVISED CHARGES 03/23 055-050-590-520150 (12,551.02)
2024030531633
01572
REVISED CHARGES 03/23 055-050-590-520190 (7.46)
2024030531633
01572
REVISED CHARGES 03/23 055-050-590-520170 252.82
2024030531633
01572
REVISED CHARGES 11/23 055-050-590-520150 (1,808.30)
2024030531633
01572
REVISED CHARGES 11/23 055-050-590-520170 (2,833.22)
2024030531633
01572
REVISED CHARGES 11/23 055-050-590-520190 (144.34)
2024030531633
01572
INITIAL CHARGES 02/24 055-050-590-520190 7,324.10
2024030531633
01572
INITIAL CHARGES 02/24 055-050-590-520170 172.39
2024030531633
01572
INITIAL CHARGES 02/24 055-050-590-520210 12,144.15
2024030531633
01572
INITIAL CHARGES 02/24 055-050-590-520150 439,883.20
Invoice Total: 442,432.32
3/8/2024 2,879.18
Invoice Description Account PO or Contract Line Item Amount
91497 CROSSING GUARD SERVICES 011-010-160-529215 20240119 2,879.18
Invoice Total: 2,879.18
3/8/2024 4,775.73
Invoice Description Account PO or Contract Line Item Amount
2145682 VIDEO WALL DISPLAY 011-010-110-529110 20240169 4,775.73
Invoice Total: 4,775.73
ELECTRONIC TOTAL:
VENDOR - 2412 - CALIFORNIA ISO PAYMENT # 16817
VENDOR - 1490 - ALL CITY MANAGEMENT SERVICES, INC. PAYMENT # 16818
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
VENDOR - 6366 - AUDIO VISUAL INNOVATIONS, INC PAYMENT # 16819
Page 21 of 50
.
.
Item 4 Page 23 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/8/2024 2,109.00
Invoice Description Account PO or Contract Line Item Amount
Q144407 INNOVYZE RENEWAL 011-010-110-522010 240264 2,109.00
Invoice Total: 2,109.00
3/8/2024 225.00
Invoice Description Account PO or Contract Line Item Amount
175060 VALVE TESTING 056-060-600-529000 240069 225.00
Invoice Total: 225.00
3/8/2024 236.50
Invoice Description Account PO or Contract Line Item Amount
245973AM MISCELLANEOUS SUPPLIES & LABOR 058-070-700-529000 20240115 236.50
Invoice Total: 236.50
3/8/2024 236.50
Invoice Description Account PO or Contract Line Item Amount
245975AM MISCELLANEOUS SUPPLIES & LABOR 058-070-700-529000 20240115 236.50
Invoice Total: 236.50
3/8/2024 236.50
Invoice Description Account PO or Contract Line Item Amount
245977AM MISCELLANEOUS SUPPLIES & LABOR 058-070-700-529000 20240115 236.50
Invoice Total: 236.50
3/8/2024 236.50
Invoice Description Account PO or Contract Line Item Amount
245981AM MISCELLANEOUS SUPPLIES & LABOR 058-070-700-529000 20240115 236.50
Invoice Total: 236.50
3/8/2024 13,545.52
VENDOR - 7667 - C&L REFRIGERATION CORPORATION PAYMENT # 16825
VENDOR - 1401 - CENTRAL BASIN MWD PAYMENT # 16826
VENDOR - 7667 - C&L REFRIGERATION CORPORATION PAYMENT # 16822
VENDOR - 7667 - C&L REFRIGERATION CORPORATION PAYMENT # 16823
VENDOR - 7667 - C&L REFRIGERATION CORPORATION PAYMENT # 16824
VENDOR - 6445 - AUTODESK, INC PAYMENT # 16820
VENDOR - 2177 - BASIN VALVE COMPANY PAYMENT # 16821
Page 22 of 50
.
.
Item 4 Page 24 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
VERJAN24 POTABLE WATER CHARGES 01/24 058-070-700-520130 6,451.00
VERJAN24 POTABLE WATER CHARGES 01/24 055-050-586-520135- 7,094.52
Invoice Total: 13,545.52
3/8/2024 381,700.00
Invoice Description Account PO or Contract Line Item Amount
IN245298 5-YEAR ASSURE MAINTENANCE PLAN 055-050-595-529702 20240311 381,700.00
Invoice Total: 381,700.00
3/8/2024 2,129.21
Invoice Description Account PO or Contract Line Item Amount
4178452891 UNIFORM RENTAL SERVICE 011-040-420-524000 CS-1397 37.38
4178452891 UNIFORM RENTAL SERVICE 011-040-430-524000 CS-1397 260.36
Invoice Total: 297.74
4179186835 UNIFORM SERVICES 055-050-586-524000- LP-0663 297.11
4179186835 UNIFORM SERVICES 055-050-586-524000- LP-0663 96.53
4179186835 UNIFORM SERVICES 058-070-700-524000 LP-0663 200.75
4179186835 UNIFORM SERVICES 055-050-550-524000 LP-0663 15.36
4179186835 UNIFORM SERVICES 055-050-555-524000 LP-0663 198.15
Invoice Total: 807.90
4179937278 UNIFORM SERVICE 055-050-586-524000- LP-0663 312.28
4179937278 UNIFORM SERVICE 056-060-600-524000 LP-0663 79.22
4179937278 UNIFORM SERVICE 058-070-700-524000 LP-0663 141.46
4179937278 UNIFORM SERVICE 055-050-550-524000 LP-0663 15.36
4179937278 UNIFORM SERVICE 055-050-555-524000 LP-0663 166.45
Invoice Total: 714.77
4180643851 UNIFORM RENTAL SERVICE 011-040-420-524000 CS-1397 63.83
4180643851 UNIFORM RENTAL SERVICE 011-040-430-524000 CS-1397 244.97
Invoice Total: 308.80
3/8/2024 110.00
VENDOR - 7500 - CHARGEPOINT INC PAYMENT # 16827
VENDOR - 5490 - CINTAS CORPORATION NO. 2 PAYMENT # 16828
VENDOR - 947 - DAILY JOURNAL CORPORATION PAYMENT # 16829
Page 23 of 50
.
.
Item 4 Page 25 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
B3763966 PUBLICATION SERVICES 011-010-125-525000 110.00
Invoice Total: 110.00
3/8/2024 1,650.00
Invoice Description Account PO or Contract Line Item Amount
INV0109 DECEMBER OUTAGE SCAFFOLD SUPPORT 055-050-586-529005- 20240222 1,650.00
Invoice Total: 1,650.00
3/8/2024 6,867.26
Invoice Description Account PO or Contract Line Item Amount
21035 PARTS & SUPPLIES 058-070-700-529000 240025 4,222.56
Invoice Total: 4,222.56
22075 PARTS & SUPPLIES 058-070-700-529000 240025 2,644.70
Invoice Total: 2,644.70
3/8/2024 37,300.00
Invoice Description Account PO or Contract Line Item Amount
20223598 PENSION, OPEB & BOND DEBT MODELING 011-010-130-529225 FI-0039 6,527.50
20223598 PENSION, OPEB & BOND DEBT MODELING 055-050-580-529225 FI-0039 3,263.75
20223598 PENSION, OPEB & BOND DEBT MODELING 058-070-700-529225 FI-0039 1,087.92
20223598 PENSION, OPEB & BOND DEBT MODELING 011-000-000-121000 FI-0039 15,852.50
20223598 PENSION, OPEB & BOND DEBT MODELING 055-000-000-121000 FI-0039 7,926.25
20223598 PENSION, OPEB & BOND DEBT MODELING 058-000-000-121000 FI-0039 2,642.08
Invoice Total: 37,300.00
3/8/2024 979.58
VENDOR - 524 - FERGUSON WATERWORKS PAYMENT # 16831
VENDOR - 6441 - GOVINVEST, INC PAYMENT # 16832
VENDOR - 1712 - GRAINGER, CO PAYMENT # 16833
VENDOR - 7709 - DON CORNELL JACKSON PAYMENT # 16830
Page 24 of 50
.
.
Item 4 Page 26 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
9009055147 PARTS & SUPPLIES 055-050-560-529000 240114 288.61
Invoice Total: 288.61
9009414161 PARTS & SUPPLIES 055-050-560-529000 240114 89.47
Invoice Total: 89.47
9857206750 PARTS & SUPPLIES 055-050-586-529003- 240035 324.13
Invoice Total: 324.13
9973628754 PARTS & SUPPLIES 058-070-700-529000 240042 277.37
Invoice Total: 277.37
3/8/2024 968.00
Invoice Description Account PO or Contract Line Item Amount
3AX00115 WASTE DISPOSAL 011-040-410-529215 CS-1371 102.00
Invoice Total: 102.00
3CX00112 WASTE DISPOSAL 011-040-410-529215 CS-1371 102.00
Invoice Total: 102.00
41X00107 WASTE DISPOSAL 011-040-415-529215 CS-1371 171.50
Invoice Total: 171.50
41X00110 WASTE DISPOSAL 011-040-410-529215 CS-1371 102.00
Invoice Total: 102.00
42X00102 WASTE DISPOSAL 011-040-415-529215 CS-1371 171.50
Invoice Total: 171.50
42X00105 WASTE DISPOSAL 011-040-415-529215 CS-1371 319.00
Invoice Total: 319.00
3/8/2024 159,161.53
Invoice Description Account PO or Contract Line Item Amount
1101123114 MICROSOFT 365 SUBSCRIPTION LICENSE 011-010-110-529110 24027420230086 5,020.90
Invoice Total: 5,020.90
1101131820 ENTERPRISE LICENSE AGREEMENT 011-010-110-529110 24029720230086 154,140.63
Invoice Total: 154,140.63
VENDOR - 3606 - INSIGHT PUBLIC SECTOR, INC PAYMENT # 16835
VENDOR - 5350 - HAUL-AWAY RUBBISH SERVICE CO., INC PAYMENT # 16834
Page 25 of 50
.
.
Item 4 Page 27 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/8/2024 16,797.75
Invoice Description Account PO or Contract Line Item Amount
D3775700006 PROFESSIONAL SERVICES THROUGH
12/29/2023
055-050-580-529225 20240020 518.25
D3775700006 PROFESSIONAL SERVICES THROUGH
12/29/2023
058-070-700-529225 20240020 3,361.00
D3775700006 PROFESSIONAL SERVICES THROUGH
12/29/2023
055-050-586-529235- 20240020 10,377.00
D3775700006 PROFESSIONAL SERVICES THROUGH
12/29/2023
055-050-560-529215 20240020 2,541.50
Invoice Total: 16,797.75
3/8/2024 1,210.76
Invoice Description Account PO or Contract Line Item Amount
120462 TRAFFIC CONTROL SUPPLIES 011-040-430-522000 240054 721.25
Invoice Total: 721.25
123134 TRAFFIC CONTROL SUPPLIES 011-040-430-522000 240054 489.51
Invoice Total: 489.51
3/8/2024 143.87
Invoice Description Account PO or Contract Line Item Amount
58419IN SAFETY WORK BOOTS 055-050-585-524000 240237 143.87
Invoice Total: 143.87
3/8/2024 17.51
Invoice Description Account PO or Contract Line Item Amount
130982 PARTS & SUPPLIES 011-040-410-522000 240123 17.51
Invoice Total: 17.51
3/8/2024 4,072.02
Invoice Description Account PO or Contract Line Item Amount
676177368 INTERNET ACCESS SERVICES 02/24 059-080-800-520173 20240063 4,072.02
Invoice Total: 4,072.02
VENDOR - 3053 - LEVEL 3 FINANCING, INC PAYMENT # 16840
VENDOR - 5093 - JCL TRAFFIC SERVICES PAYMENT # 16837
VENDOR - 171 - L&M FOOTWEAR PAYMENT # 16838
VENDOR - 804 - LB JOHNSON INDUSTRIAL HARDWARE PAYMENT # 16839
VENDOR - 6886 - JACOBS ENGINEERING GROUP, INC PAYMENT # 16836
Page 26 of 50
.
.
Item 4 Page 28 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/8/2024 9,569.16
Invoice Description Account PO or Contract Line Item Amount
105801 GROUNDS MAINTENANCE 12/23 011-040-415-529000 CS-1413 4,709.00
Invoice Total: 4,709.00
106238 GROUNDS MAINTENANCE 01/24 011-040-415-529000 CS-1413 4,860.16
Invoice Total: 4,860.16
3/8/2024 5,203.91
Invoice Description Account PO or Contract Line Item Amount
29124762 SPECIALTY GASES 055-050-586-529000- LP-0790 4,183.77
Invoice Total: 4,183.77
29131941 SPECIALTY GASES 055-050-586-529000- LP-0790 478.76
Invoice Total: 478.76
771101550 CYLINDER RENTAL 055-050-586-529000- LP-0790 541.38
Invoice Total: 541.38
3/8/2024 15,979.49
Invoice Description Account PO or Contract Line Item Amount
6670578885 WATER TREATMENT SERVICES 055-050-586-520235- LP-0765 15,979.49
Invoice Total: 15,979.49
3/8/2024 5,000.00
Invoice Description Account PO or Contract Line Item Amount
2786 POSTAGE REPLENISHMENT 011-010-130-522000 FI-0041 5,000.00
Invoice Total: 5,000.00
3/8/2024 14,100.00
Invoice Description Account PO or Contract Line Item Amount
15849 GEOVIEWER SUBSCRIPTION 011-010-110-529110 240324 14,100.00
Invoice Total: 14,100.00
VENDOR - 7321 - NALCO COMPANY LLC PAYMENT # 16843
VENDOR - 6687 - NEXTDAY DELIVERY SERVICE, LLC PAYMENT # 16844
VENDOR - 5709 - NOBEL SYSTEMS, INC PAYMENT # 16845
VENDOR - 6422 - MARIPOSA LANDSCAPES, INC PAYMENT # 16841
VENDOR - 6520 - MATHESON TRI-GAS, INC PAYMENT # 16842
Page 27 of 50
.
.
Item 4 Page 29 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/8/2024 971.08
Invoice Description Account PO or Contract Line Item Amount
200174IN TAGGING SERVICES - FEBRUARY 2024 055-050-590-529215 240022 971.08
Invoice Total: 971.08
3/8/2024 3,358.05
Invoice Description Account PO or Contract Line Item Amount
29855 H215 INSTALL BED SLIDE 011-040-420-522000 240348 2,668.05
29855 H215 INSTALL BED SLIDE 011-040-420-529000 240348 690.00
Invoice Total: 3,358.05
3/8/2024 82.00
Invoice Description Account PO or Contract Line Item Amount
1308 CAR WASH SERVICES 055-050-555-527000 240135 70.00
Invoice Total: 70.00
1311 CAR WASHES SERVICES 011-030-300-527000 240063 12.00
Invoice Total: 12.00
3/8/2024 208.00
Invoice Description Account PO or Contract Line Item Amount
3094986460 SUBSCRIPTION DUES 02/24 011-010-115-529600 LD-0045 208.00
Invoice Total: 208.00
3/8/2024 16.00
Invoice Description Account PO or Contract Line Item Amount
123023 ADVANCED ROADSIDE IMPAIRED DRIVING
ENFORCEMENT
011-030-300-529500 16.00
Invoice Total: 16.00
3/8/2024 226.50
Invoice Description Account PO or Contract Line Item Amount
12282023 TRAINING: LASER OPERATOR 011-030-300-529500 226.50
VENDOR - 6884 - RELX, INC PAYMENT # 16849
VENDOR - 868 - RICHARD VILLEGAS PAYMENT # 16850
VENDOR - 7512 - RUDY HERNANDEZ PAYMENT # 16851
VENDOR - 629 - OPEN ACCESS TECHNOLOGY INTL PAYMENT # 16846
VENDOR - 4111 - PACIFIC COMMERCIAL TRUCK BODY PAYMENT # 16847
VENDOR - 870 - PARNASA TOV INC PAYMENT # 16848
Page 28 of 50
.
.
Item 4 Page 30 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 226.50
3/8/2024 1,050.00
Invoice Description Account PO or Contract Line Item Amount
1186113010201
24
FIBER INTERNET SERVICE 02/24 011-010-110-526010 1,050.00
Invoice Total: 1,050.00
3/8/2024 10,464.72
Invoice Description Account PO or Contract Line Item Amount
IN17179 ELEMENT REPAIR KITS 056-060-600-529000 240283 10,464.72
Invoice Total: 10,464.72
3/8/2024 50,732.28
Invoice Description Account PO or Contract Line Item Amount
402236 PUBLIC SAFETY SOFTWARE SYSTEM 011-010-110-529110 20240184 50,732.28
Invoice Total: 50,732.28
3/8/2024 16,900.00
Invoice Description Account PO or Contract Line Item Amount
45430756 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-529110 IT-0152 2,100.00
Invoice Total: 2,100.00
45431564 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-529110 IT-0152 3,500.00
Invoice Total: 3,500.00
45432516 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-529110 IT-0152 1,400.00
Invoice Total: 1,400.00
45435350(2) TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-529110 IT-0152 1,400.00
Invoice Total: 1,400.00
45453847 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-529110 IT-0152 2,100.00
Invoice Total: 2,100.00
45454927 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-660005 IT-0152 5,000.00
Invoice Total: 5,000.00
VENDOR - 1447 - TYLER TECHNOLOGIES, INC PAYMENT # 16855
VENDOR - 7419 - SPECTRUM BUSINESS PAYMENT # 16852
VENDOR - 4318 - TIMOTHY MARQUEZ PAYMENT # 16853
VENDOR - 5069 - TRITECH SOFTWARE SYSTEMS PAYMENT # 16854
Page 29 of 50
.
.
Item 4 Page 31 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
45456656 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-529110 IT-0152 1,400.00
Invoice Total: 1,400.00
3/8/2024 2,642.32
Invoice Description Account PO or Contract Line Item Amount
11413754477 PORTABLE RESTROOM 12/05/23 - 01/01/24 058-070-700-529000 20240117 188.16
Invoice Total: 188.16
11413775097 PORTABLE RESTROOM 01/02/24 - 01/29/24 058-070-700-529000 20240117 188.16
Invoice Total: 188.16
11413790460 PORTABLE RESTROOM 1/30/24 - 2/26/24 058-070-700-529000 20240117 188.16
Invoice Total: 188.16
INV4050726 PORTABLE RESTROOM 12/18/23 -01/14/24 055-050-550-529000 20240118 267.14
Invoice Total: 267.14
INV4059462 PORTABLE RESTROOM 12/21/23 - 01/17/24 055-050-550-529000 20240118 122.54
Invoice Total: 122.54
INV4059463 PORTABLE RESTROOM 12/21/23 - 01/17/24 055-050-550-529000 20240118 228.54
Invoice Total: 228.54
INV4059464 PORTABLE RESTROOM 12/21/23 - 01/17/24 055-050-550-529000 20240118 111.59
Invoice Total: 111.59
INV4116212 PORTABLE RESTROOM 1/15/24 - 2/11/24 055-050-550-529000 20240118 267.14
Invoice Total: 267.14
INV4125242 PORTABLE RESTROOM 1/18/24 - 2/14/24 055-050-550-529000 20240118 122.54
Invoice Total: 122.54
INV4126074 PORTABLE RESTROOM 1/18/24 - 2/14/24 055-050-550-529000 20240118 111.59
Invoice Total: 111.59
INV4126198 PORTABLE RESTROOM 1/18/24 - 2/14/24 055-050-550-529000 20240118 228.54
Invoice Total: 228.54
INV4183761 PORTABLE RESTROOM 2/12/24 - 3/10/24 055-050-550-529000 20240118 267.14
VENDOR - 3601 - UNITED SITE SERVICES OF CALIFORNIA,
INC.
PAYMENT # 16856
Page 30 of 50
.
.
Item 4 Page 32 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 267.14
INV4191672 PORTABLE RESTROOM 2/15/24 - 3/14/24 058-070-700-529000 20240117 122.54
Invoice Total: 122.54
INV4192141 PORTABLE RESTROOM 2/15/24 - 3/13/24 055-050-550-529000 20240118 228.54
Invoice Total: 228.54
3/8/2024 14,668.92
Invoice Description Account PO or Contract Line Item Amount
IN216005 INTERNET SERVICE 059-080-800-520173 20240299 9,271.99
Invoice Total: 9,271.99
IN216006 INTERNET SERVICE 059-080-800-520173 20240045 5,396.93
Invoice Total: 5,396.93
3/8/2024 2,200.00
Invoice Description Account PO or Contract Line Item Amount
022024 TUITION REIMBURSEMENT 011-010-120-529680 2,200.00
Invoice Total: 2,200.00
3/8/2024 7,374.22
Invoice Description Account PO or Contract Line Item Amount
5660093 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 336.26
Invoice Total: 336.26
5660096 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 437.14
Invoice Total: 437.14
5660098 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 477.49
Invoice Total: 477.49
5660099 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 336.26
Invoice Total: 336.26
5660101 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 336.26
Invoice Total: 336.26
5662042 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 336.26
Invoice Total: 336.26
VENDOR - 7446 - VERONICA PALAFOX PAYMENT # 16858
VENDOR - 7110 - WATERLINE TECHNOLOGIES, INC PAYMENT # 16859
VENDOR - 7343 - USIPCOMMUNICATION, LLC PAYMENT # 16857
Page 31 of 50
.
.
Item 4 Page 33 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
5667664 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 390.06
Invoice Total: 390.06
5667670 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 470.77
Invoice Total: 470.77
5667671 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 685.98
Invoice Total: 685.98
5667673 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 336.26
Invoice Total: 336.26
5669453 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 184.94
Invoice Total: 184.94
5669454 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 188.31
Invoice Total: 188.31
5669455 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 423.69
Invoice Total: 423.69
5669456 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 383.34
Invoice Total: 383.34
5669460 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 396.79
Invoice Total: 396.79
5669462 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 242.11
Invoice Total: 242.11
5669575 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 336.26
Invoice Total: 336.26
5670765 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 369.89
Invoice Total: 369.89
5670766 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 420.33
Invoice Total: 420.33
5670778 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 285.82
Invoice Total: 285.82
3/8/2024 543.72
Invoice Description Account PO or Contract Line Item Amount
5656188 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 (38.03)
VENDOR - 7110 - WATERLINE TECHNOLOGIES, INC PAYMENT # 16860
Page 32 of 50
.
.
Item 4 Page 34 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: (38.03)
5669461 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 134.51
Invoice Total: 134.51
5670779 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 151.32
Invoice Total: 151.32
5670783 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 161.41
Invoice Total: 161.41
5670785 SODIUM HYPOCHLORITE 058-070-700-520140 20240032 134.51
Invoice Total: 134.51
3/8/2024 4,295.00
Invoice Description Account PO or Contract Line Item Amount
SI013065 DOCUPEAK LICENSE SUBSCRIPTION 011-010-110-529110 20240285 4,295.00
Invoice Total: 4,295.00
3/6/2024 109.26
Invoice Description Account PO or Contract Line Item Amount
838245909 PERIOD: 01/24 055-050-580-522000 78.13
838245909 PERIOD: 01/24 011-010-120-522000 31.13
Invoice Total: 109.26
3/6/2024 55.98
Invoice Description Account PO or Contract Line Item Amount
838984100 PERIOD: 01/24 011-010-125-522000 55.98
Invoice Total: 55.98
3/6/2024 71.16
Invoice Description Account PO or Contract Line Item Amount
840355861 PERIOD: 02/24 011-010-120-522000 71.16
Invoice Total: 71.16
3/6/2024 78.80
VENDOR - 249 - FEDERAL EXPRESS CORPORATION PAYMENT # 16871
VENDOR - 249 - FEDERAL EXPRESS CORPORATION PAYMENT # 16872
VENDOR - 4917 - WEBIPLEX, INC PAYMENT # 16861
VENDOR - 249 - FEDERAL EXPRESS CORPORATION PAYMENT # 16869
VENDOR - 249 - FEDERAL EXPRESS CORPORATION PAYMENT # 16870
Page 33 of 50
.
.
Item 4 Page 35 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Description Account PO or Contract Line Item Amount
841038611 PERIOD: 02/24 055-050-580-522000 78.80
Invoice Total: 78.80
3/6/2024 8.74
Invoice Description Account PO or Contract Line Item Amount
966922388 PERIOD: 01/24 011-010-130-522000 8.74
Invoice Total: 8.74
3/6/2024 4.48
Invoice Description Account PO or Contract Line Item Amount
966962270 PERIOD: 01/24 011-010-130-522000 4.48
Invoice Total: 4.48
3/15/2024 1,485,281.22
Invoice Description Account PO or Contract Line Item Amount
2024031231633
66438
REVISED CHARGES 05/22 055-050-590-520150 (297.71)
2024031231633
66438
REVISED CHARGES 05/22 055-050-590-520190 (5.55)
2024031231633
66438
REVISED CHARGES 05/22 055-050-590-520170 2,026.81
2024031231633
66438
REVISED CHARGES 11/23 055-050-590-520170 (6,986.16)
2024031231633
66438
REVISED CHARGES 11/23 055-050-590-520240 (13.71)
2024031231633
66438
REVISED CHARGES 11/23 055-050-590-520190 77.99
2024031231633
66438
REVISED CHARGES 11/23 055-050-590-520210 20.42
2024031231633
66438
REVISED CHARGES 11/23 055-050-590-520150 169,296.76
2024031231633
66438
INITIAL CHARGES 02/24 055-050-590-520240 8,352.18
VENDOR - 249 - FEDERAL EXPRESS CORPORATION PAYMENT # 16874
VENDOR - 2412 - CALIFORNIA ISO PAYMENT # 16877
VENDOR - 249 - FEDERAL EXPRESS CORPORATION PAYMENT # 16873
Page 34 of 50
.
.
Item 4 Page 36 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
2024031231633
66438
INITIAL CHARGES 02/24 055-050-590-520190 8,248.74
2024031231633
66438
INITIAL CHARGES 02/24 055-050-590-520210 11,642.69
2024031231633
66438
INITIAL CHARGES 02/24 055-050-590-520180 240,633.94
2024031231633
66438
INITIAL CHARGES 02/24 055-050-590-520170 767,441.00
2024031231633
66438
INITIAL CHARGES 02/24 055-050-590-520150 284,843.82
Invoice Total: 1,485,281.22
3/15/2024 296,292.00
Invoice Description Account PO or Contract Line Item Amount
PV0324 MARCH 2024 CAPACITY 055-050-590-520180 236,153.00
PV0324 FEBRUARY 2024 ENERGY 055-050-590-520150 50,139.00
PV0324 PSF 055-000-000-122100 10,000.00
Invoice Total: 296,292.00
3/11/2024 2,524.50
Invoice Description Account PO or Contract Line Item Amount
11633 VERNON POLICE ASSOCIATION DUES
03.07.24
011-000-000-210250 2,524.50
Invoice Total: 2,524.50
3/11/2024 4,126.08
Invoice Description Account PO or Contract Line Item Amount
11635 IBEW MEMBERSHIP ASSOCIATION DUES
03.07.24
055-000-000-210250 3,651.69
11635 IBEW MEMBERSHIP ASSOCIATION DUES
03.07.24
056-000-000-210250 341.96
11635 IBEW MEMBERSHIP ASSOCIATION DUES
03.07.24
058-000-000-210250 132.43
Invoice Total: 4,126.08
VENDOR - 3407 - VERNON POLICE OFFICERS BENEFIT PAYMENT # 16879
VENDOR - 5323 - IBEW LOCAL 47 PAYMENT # 16880
VENDOR - 2517 - SCPPA PAYMENT # 16878
Page 35 of 50
.
.
Item 4 Page 37 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/15/2024 1,883,259.08
Invoice Description Account PO or Contract Line Item Amount
240058 ELECTRIC SYSTEM MAINTENANCE 02/24 055-000-000-200400 LP-0761-1 1,883,259.08
Invoice Total: 1,883,259.08
3/15/2024 16,530.00
Invoice Description Account PO or Contract Line Item Amount
433770 FEBRUARY 2024 055-050-590-520160 16,530.00
Invoice Total: 16,530.00
3/15/2024 11,992.50
Invoice Description Account PO or Contract Line Item Amount
82 GRAFFITI ABATEMENT SERVICES 011-040-430-529215 20240066 2,250.00
Invoice Total: 2,250.00
84 GRAFFITI ABATEMENT SERVICES 011-040-430-529215 20240066 4,533.75
Invoice Total: 4,533.75
85 GRAFFITI ABATEMENT SERVICES 011-040-430-529215 20240066 5,208.75
Invoice Total: 5,208.75
3/15/2024 24.00
Invoice Description Account PO or Contract Line Item Amount
022824 EXPENSE REIMBURSEMENT 011-030-300-529500 24.00
Invoice Total: 24.00
3/15/2024 7,000.00
Invoice Description Account PO or Contract Line Item Amount
02241979341 FEBRUARY 2024 055-050-590-520160 7,000.00
Invoice Total: 7,000.00
3/15/2024 694.74
Invoice Description Account PO or Contract Line Item Amount
4179186524 UNIFORM RENTAL SERVICE 011-040-420-524000 CS-1397 37.38
VENDOR - 6298 - CIMA ENERGY, LP PAYMENT # 16885
VENDOR - 5490 - CINTAS CORPORATION NO. 2 PAYMENT # 16886
VENDOR - 7225 - TWIN EAGLE HOLDINGS N.A., LLC PAYMENT # 16882
VENDOR - 7393 - APPLY THE PRESSURE GROUP PAYMENT # 16883
VENDOR - 3782 - CARLOS OURIQUE PAYMENT # 16884
VENDOR - 3049 - PETRELLI ELECTRIC, INC PAYMENT # 16881
Page 36 of 50
.
.
Item 4 Page 38 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
4179186524 UNIFORM RENTAL SERVICE 011-040-430-524000 CS-1397 260.36
Invoice Total: 297.74
4182798643 UNIFORM RENTAL SERVICE 011-040-420-524000 CS-1397 37.38
4182798643 UNIFORM RENTAL SERVICE 011-040-430-524000 CS-1397 272.59
Invoice Total: 309.97
5198634739 FIRST AID KIT RESTOCK 011-040-430-524000 CS-1397 87.03
Invoice Total: 87.03
3/15/2024 1,392,739.45
Invoice Description Account PO or Contract Line Item Amount
C0011876 FIRE PROTECTION SERVICES 04/24 011-030-305-529215 1,392,739.45
Invoice Total: 1,392,739.45
3/15/2024 200.00
Invoice Description Account PO or Contract Line Item Amount
B3789338 PUBLICATION SERVICES 011-010-125-525000 200.00
Invoice Total: 200.00
3/15/2024 421.75
Invoice Description Account PO or Contract Line Item Amount
161648 PARKING CITATION PROCESSING 01/24 011-030-300-529220 PD-0180 421.75
Invoice Total: 421.75
3/15/2024 898.50
Invoice Description Account PO or Contract Line Item Amount
A123852 ANNUAL PREVENTATIVE MAINTENANCE
SVCS
055-050-570-529215 20240110 898.50
Invoice Total: 898.50
3/15/2024 32.70
Invoice Description Account PO or Contract Line Item Amount
022224 EXPENSE REIMBURSEMENT 055-050-590-529670 32.70
VENDOR - 2051 - EFRAIN SANDOVAL PAYMENT # 16891
VENDOR - 947 - DAILY JOURNAL CORPORATION PAYMENT # 16888
VENDOR - 6191 - DATA TICKET, INC PAYMENT # 16889
VENDOR - 6714 - DUTHIE ELECTRIC SERVICE
CORPORATION
PAYMENT # 16890
VENDOR - 1444 - COUNTY OF LOS ANGELES PAYMENT # 16887
Page 37 of 50
.
.
Item 4 Page 39 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 32.70
3/15/2024 3,976.59
Invoice Description Account PO or Contract Line Item Amount
6584 PARTS & SERVICES 058-070-700-529000 230183 3,976.59
Invoice Total: 3,976.59
3/15/2024 827.50
Invoice Description Account PO or Contract Line Item Amount
159534 AUTO PARTS 011-040-420-522000 240005 827.50
Invoice Total: 827.50
3/15/2024 6,714.30
Invoice Description Account PO or Contract Line Item Amount
9000417650 PARTS & SUPPLIES 056-060-600-522000 240071 125.39
Invoice Total: 125.39
9004816436 PARTS & SUPPLIES 055-050-586-520231- 240035 409.55
Invoice Total: 409.55
9026282054 PARTS & SUPPLIES 056-060-600-529000 240071 424.37
Invoice Total: 424.37
9050954289 PARTS & SUPPLIES 011-040-415-522000 240117 93.70
Invoice Total: 93.70
9950614199 UNIFORMS 055-050-555-524000 240114 680.02
Invoice Total: 680.02
9950614207 PARTS & SUPPLIES 055-050-570-522000 240114 124.83
Invoice Total: 124.83
9970939675 PARTS & SUPPLIES 055-050-586-520231- 240035 670.16
Invoice Total: 670.16
9975090979 PARTS & SUPPLIES 056-060-600-522000 240071 111.30
Invoice Total: 111.30
9976148255 UNIFORMS 055-050-555-524000 240114 1,455.35
Invoice Total: 1,455.35
VENDOR - 1712 - GRAINGER, CO PAYMENT # 16894
VENDOR - 524 - FERGUSON WATERWORKS PAYMENT # 16892
VENDOR - 399 - GARVEY EQUIPMENT COMPANY PAYMENT # 16893
Page 38 of 50
.
.
Item 4 Page 40 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
9976154295 UNIFORMS 055-050-555-524000 240114 873.21
Invoice Total: 873.21
9976950304 UNIFORMS 055-050-555-524000 240114 1,746.42
Invoice Total: 1,746.42
3/15/2024 718,053.11
Invoice Description Account PO or Contract Line Item Amount
50153 STREET IMPROVEMENTS 011-040-430-660000 20240122 718,053.11
Invoice Total: 718,053.11
3/15/2024 885.36
Invoice Description Account PO or Contract Line Item Amount
42X00103 WASTE DISPOSAL 011-040-415-529215 CS-1371 683.36
Invoice Total: 683.36
42X00109 WASTE DISPOSAL 011-040-415-529215 CS-1371 202.00
Invoice Total: 202.00
3/15/2024 32,002.75
Invoice Description Account PO or Contract Line Item Amount
D3775700007 PROFESSIONAL SERVICES THROUGH
01/26/2024
055-050-580-529225 20240020 876.75
D3775700007 PROFESSIONAL SERVICES THROUGH
01/26/2024
055-050-586-529235- 20240020 15,804.25
D3775700007 PROFESSIONAL SERVICES THROUGH
01/26/2024
055-050-560-529215 20240020 1,775.50
Invoice Total: 18,456.50
D3775700008 PROFESSIONAL SERVICES THROUGH
2/23/2024
055-050-580-529225 20240020 959.75
D3775700008 PROFESSIONAL SERVICES THROUGH
2/23/2024
056-060-600-529225 20240020 1,282.50
D3775700008 PROFESSIONAL SERVICES THROUGH
2/23/2024
055-050-586-529235- 20240020 8,889.25
D3775700008 PROFESSIONAL SERVICES THROUGH
2/23/2024
055-050-560-529215 20240020 2,414.75
VENDOR - 6886 - JACOBS ENGINEERING GROUP, INC PAYMENT # 16897
VENDOR - 6289 - HARDY & HARPER, INC PAYMENT # 16895
VENDOR - 5350 - HAUL-AWAY RUBBISH SERVICE CO., INC PAYMENT # 16896
Page 39 of 50
.
.
Item 4 Page 41 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 13,546.25
3/15/2024 40.00
Invoice Description Account PO or Contract Line Item Amount
010124 EXPENSE REIMBURSEMENT 011-030-300-529500 40.00
Invoice Total: 40.00
3/15/2024 5,500.00
Invoice Description Account PO or Contract Line Item Amount
FEB24 VERNON COMMUNITY FUND
ADMINISTRATION 02/24
011-010-140-529215 20240111 5,500.00
Invoice Total: 5,500.00
3/15/2024 392.51
Invoice Description Account PO or Contract Line Item Amount
130487 PARTS & SUPPLIES 055-050-555-522000 240103 65.69
Invoice Total: 65.69
131094 PARTS & SUPPLIES 055-050-555-529000 240103 240.86
Invoice Total: 240.86
819203 PARTS & SUPPLIES 011-040-430-522000 240123 85.96
Invoice Total: 85.96
3/15/2024 1,511.57
Invoice Description Account PO or Contract Line Item Amount
18937138 REMOVAL PUNCH SET & SPRING PINS 055-050-560-529000 240107 249.33
Invoice Total: 249.33
18942603 PARTS & SUPPLIES 055-050-560-529000 240107 236.30
Invoice Total: 236.30
19918614 PARTS & SUPPLIES 055-050-586-529003- 240126 305.14
Invoice Total: 305.14
20155114 PARTS & SUPPLIES 055-050-586-529000- 240126 320.00
Invoice Total: 320.00
VENDOR - 804 - LB JOHNSON INDUSTRIAL HARDWARE PAYMENT # 16900
VENDOR - 1150 - MCMASTER-CARR SUPPLY COMPANY PAYMENT # 16901
VENDOR - 5630 - JASON LUCAS PAYMENT # 16898
VENDOR - 5108 - JEMMOTT ROLLINS GROUP, INC PAYMENT # 16899
Page 40 of 50
.
.
Item 4 Page 42 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
20204424 CALIBRATION SOLUTION 055-050-586-529003- 240126 71.67
Invoice Total: 71.67
20349870 MISC PARTS 055-050-560-529000 240107 329.13
Invoice Total: 329.13
3/15/2024 3,597.04
Invoice Description Account PO or Contract Line Item Amount
239437 CALIBRATIONS 056-060-600-529000 20240097 1,990.60
Invoice Total: 1,990.60
239993 ANNUAL GAS METER CALIBRATION 056-060-600-529000 20240097 1,093.71
Invoice Total: 1,093.71
240038 MAINTENANCE & REPAIR 056-060-600-529000 20240097 512.73
Invoice Total: 512.73
3/15/2024 2,574.00
Invoice Description Account PO or Contract Line Item Amount
9396 FEBRUARY 2024 055-050-590-520160 2,574.00
Invoice Total: 2,574.00
3/15/2024 24.00
Invoice Description Account PO or Contract Line Item Amount
2/22/24 EXPENSE REIMBURSEMENT 011-030-300-529500 24.00
Invoice Total: 24.00
3/15/2024 65,621.25
Invoice Description Account PO or Contract Line Item Amount
1850 PROFESSIONAL SERVICES 058-070-700-529000 20240224 1,425.00
1850 PROFESSIONAL SERVICES 058-070-700-660000 20240224 9,476.25
1850 PROFESSIONAL SERVICES 058-070-700-660000 20240224 1,425.00
1850 PROFESSIONAL SERVICES 055-050-560-660000 20240224 3,705.00
1850 PROFESSIONAL SERVICES 058-070-700-529000 20240224 2,850.00
1850 PROFESSIONAL SERVICES 055-050-560-529000 20240224 2,850.00
VENDOR - 6318 - MIECO, LLC PAYMENT # 16903
VENDOR - 6950 - NICHOLAS MANNINO PAYMENT # 16904
VENDOR - 5614 - NORTHWEST ELECTRICAL SERVICES, LLC PAYMENT # 16905
VENDOR - 839 - MEASUREMENT CONTROL SYSTEMS, INC PAYMENT # 16902
Page 41 of 50
.
.
Item 4 Page 43 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
1850 PROFESSIONAL SERVICES 055-050-580-529225 20240224 3,277.50
1850 PROFESSIONAL SERVICES 055-050-585-660000 20240224 37,620.00
1850 PROFESSIONAL SERVICES 055-050-555-660000 20240224 2,992.50
Invoice Total: 65,621.25
3/15/2024 1,234.88
Invoice Description Account PO or Contract Line Item Amount
173719lN PARTS & SERVICES 056-060-600-529000 240361 196.75
Invoice Total: 196.75
173720IN PARTS & SERVICES 056-060-600-529000 240361 251.13
Invoice Total: 251.13
173721IN PARTS & SERVICES 056-060-600-529000 240361 196.75
Invoice Total: 196.75
173722IN PARTS & SERVICES 056-060-600-529000 240361 196.75
Invoice Total: 196.75
173723IN PARTS & SERVICES 056-060-600-529000 240361 196.75
Invoice Total: 196.75
173724IN PARTS & SERVICES 056-060-600-529000 240361 196.75
Invoice Total: 196.75
3/15/2024 11,745.00
Invoice Description Account PO or Contract Line Item Amount
241750 FEBRUARY 2024 055-050-590-520160 11,745.00
Invoice Total: 11,745.00
3/15/2024 459.00
Invoice Description Account PO or Contract Line Item Amount
030824 TUITION REIMBURSEMENT 011-010-120-529680 459.00
Invoice Total: 459.00
3/15/2024 130,776.00
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 6198 - S&S LABOR FORCE, INC PAYMENT # 16909
VENDOR - 3332 - P&F DISTRIBUTORS PAYMENT # 16906
VENDOR - 5908 - PACIFIC SUMMIT ENERGY, LLC PAYMENT # 16907
VENDOR - 3701 - RAFAEL LANDA PAYMENT # 16908
Page 42 of 50
.
.
Item 4 Page 44 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
12495 SECURITY SERVICES (CITY HALL) 02/24 011-040-415-529215 20230234 10,816.00
Invoice Total: 10,816.00
12496 SECURITY SERVICES (POWER PLANT) 02/24 055-050-555-529215 20230234 85,523.20
12496 SECURITY SERVICES (POWER PLANT) 02/24 055-050-580-529215 20230234 21,380.80
Invoice Total: 106,904.00
12497 SECURITY SERVICES (EXTRA PATROL)
02/24
011-040-415-529215 20230234 13,056.00
Invoice Total: 13,056.00
3/15/2024 41,835.24
Invoice Description Account PO or Contract Line Item Amount
DH0324 MARCH 2024 055-050-590-520154 41,835.24
Invoice Total: 41,835.24
3/15/2024 347,987.44
Invoice Description Account PO or Contract Line Item Amount
ATSP0324 MARCH 2024 055-050-590-520154 347,987.44
Invoice Total: 347,987.44
3/15/2024 223,045.77
Invoice Description Account PO or Contract Line Item Amount
DSR10324 MARCH 2024 055-050-590-520154 223,045.77
Invoice Total: 223,045.77
3/15/2024 24,669.00
Invoice Description Account PO or Contract Line Item Amount
7501658659 MARCH 2024 055-050-590-520170 24,669.00
Invoice Total: 24,669.00
3/15/2024 965.08
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 2517 - SCPPA PAYMENT # 16912
VENDOR - 59 - SO CAL EDISON PAYMENT # 16913
VENDOR - 3775 - STAPLEMAN MEDIA SERVICES, INC. PAYMENT # 16914
VENDOR - 2517 - SCPPA PAYMENT # 16910
VENDOR - 2517 - SCPPA PAYMENT # 16911
Page 43 of 50
.
.
Item 4 Page 45 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
27690 ENVELOPES 011-020-200-522000 240330 434.52
Invoice Total: 434.52
27691 ENVELOPES 011-020-200-522000 240330 530.56
Invoice Total: 530.56
3/15/2024 3,000.00
Invoice Description Account PO or Contract Line Item Amount
031124 EMPLOYEE COMPUTER LOAN 011-000-000-110021 3,000.00
Invoice Total: 3,000.00
3/15/2024 3,300.00
Invoice Description Account PO or Contract Line Item Amount
030624 RETIREE HEALTH REIMBURSEMENT 2024
1Q
011-010-120-513035 3,300.00
Invoice Total: 3,300.00
3/15/2024 1,646.32
Invoice Description Account PO or Contract Line Item Amount
1120230785 DIG ALERTS & NOTIFICATIONS - 11/23 055-050-565-529000 240302 197.18
1120230785 DIG ALERTS & NOTIFICATIONS - 11/23 056-060-600-529000 240302 197.19
1120230785 DIG ALERTS & NOTIFICATIONS - 11/23 058-070-700-529000 240302 197.19
1120230785 DIG ALERTS & NOTIFICATIONS - 11/23 059-080-800-529000 240302 197.19
Invoice Total: 788.75
120240785 DIG ALERTS & NOTIFICATIONS - 01/24 055-050-565-529000 240302 104.86
120240785 DIG ALERTS & NOTIFICATIONS - 01/24 056-060-600-529000 240302 104.88
120240785 DIG ALERTS & NOTIFICATIONS - 01/24 058-070-700-529000 240302 104.88
120240785 DIG ALERTS & NOTIFICATIONS - 01/24 059-080-800-529000 240302 104.88
Invoice Total: 419.50
1220230791 DIG ALERTS & NOTIFICATIONS - 12/23 055-050-565-529000 240302 71.64
1220230791 DIG ALERTS & NOTIFICATIONS - 12/23 056-060-600-529000 240302 71.62
1220230791 DIG ALERTS & NOTIFICATIONS - 12/23 058-070-700-529000 240302 71.62
1220230791 DIG ALERTS & NOTIFICATIONS - 12/23 059-080-800-529000 240302 71.62
Invoice Total: 286.50
VENDOR - 6229 - SYLVIE DE LA RIVA GONZALEZ PAYMENT # 16915
VENDOR - 332 - TODD HEWETT PAYMENT # 16916
VENDOR - 449 - UNDERGROUND SERVICE ALERT OF SO
CAL
PAYMENT # 16917
Page 44 of 50
.
.
Item 4 Page 46 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
232424495 EXCAVATION TICKETS - 01/24 055-050-565-529000 240244 37.90
232424495 EXCAVATION TICKETS - 01/24 056-060-600-529000 240244 37.89
232424495 EXCAVATION TICKETS - 01/24 058-070-700-529000 240244 37.89
232424495 EXCAVATION TICKETS - 01/24 059-080-800-529000 240244 37.89
Invoice Total: 151.57
3/15/2024 50,030.68
Invoice Description Account PO or Contract Line Item Amount
GG1766W0224 FEBRUARY 2024 CAPACITY 055-050-590-520180 33,180.97
GG1766W0224 JANUARY 2024 ENERGY 055-050-590-520150 16,849.71
Invoice Total: 50,030.68
3/15/2024 40,185.46
Invoice Description Account PO or Contract Line Item Amount
INV0095 PUBLIC HEALTH SERVICES 03/24 011-020-200-529230- 20240109 34,535.46
Invoice Total: 34,535.46
INV0101 HEALTH OFFICER SERVICES 02/24 011-020-200-529230- HD-0054 5,650.00
Invoice Total: 5,650.00
3/15/2024 40.00
Invoice Description Account PO or Contract Line Item Amount
W4A2678 WATER SAMPLES 01/24 058-070-700-529225 20240083 40.00
Invoice Total: 40.00
3/15/2024 500.00
Invoice Description Account PO or Contract Line Item Amount
022024 RENTAL AGREEMENT 03/24 055-050-595-529703- 20240080 500.00
Invoice Total: 500.00
3/15/2024 23,400.00
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 7663 - WEST SOTO STREET PARTNERS PAYMENT # 16921
VENDOR - 6081 - YMCA OF METROPOLITAN LA PAYMENT # 16922
VENDOR - 2227 - US DEPARTMENT OF ENERGY PAYMENT # 16918
VENDOR - 7489 - WEA CA PC PAYMENT # 16919
VENDOR - 1628 - WECK ANALYTICAL ENVIRONMENTAL
SERVICES
PAYMENT # 16920
Page 45 of 50
.
.
Item 4 Page 47 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
20231211(2) YMCA COMMUNITY-BASED WELLNESS
SPONSORSHIP
011-010-160-529215 20230103 23,400.00
Invoice Total: 23,400.00
3/15/2024 3,525.49
Invoice Description Account PO or Contract Line Item Amount
INV231082 FLAME DETECTOR 055-050-560-529000 240296 3,525.49
Invoice Total: 3,525.49
3/12/2024 35.30
Invoice Description Account PO or Contract Line Item Amount
933312024 SERVICE CHARGE 011-040-405-522000 35.30
Invoice Total: 35.30
3/12/2024 36.75
Invoice Description Account PO or Contract Line Item Amount
933312034 SERVICE CHARGE 011-040-405-522000 36.75
Invoice Total: 36.75
3/12/2024 32.90
Invoice Description Account PO or Contract Line Item Amount
933312044 SERVICE CHARGE 011-040-405-522000 32.90
Invoice Total: 32.90
3/12/2024 32.90
Invoice Description Account PO or Contract Line Item Amount
933312054 SERVICE CHARGE 011-040-405-522000 32.90
Invoice Total: 32.90
3/12/2024 49.04
Invoice Description Account PO or Contract Line Item Amount
933312064 SERVICE CHARGE 011-040-405-522000 49.04
VENDOR - 1617 - UPS PAYMENT # 17015
VENDOR - 1617 - UPS PAYMENT # 17016
VENDOR - 1617 - UPS PAYMENT # 17012
VENDOR - 1617 - UPS PAYMENT # 17013
VENDOR - 1617 - UPS PAYMENT # 17014
VENDOR - 5803 - YUSSEF ACHAK PAYMENT # 16923
Page 46 of 50
.
.
Item 4 Page 48 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
Invoice Total: 49.04
3/12/2024 35.53
Invoice Description Account PO or Contract Line Item Amount
933312074 SERVICE CHARGE 011-040-405-522000 35.53
Invoice Total: 35.53
3/12/2024 30.00
Invoice Description Account PO or Contract Line Item Amount
933312503 SERVICE CHARGE 011-040-405-522000 30.00
Invoice Total: 30.00
3/15/2024 475.12
Invoice Description Account PO or Contract Line Item Amount
031424 ANNUAL EMISSION REPORT - 14502 055-050-560-520230 475.12
Invoice Total: 475.12
3/15/2024 3,449.19
Invoice Description Account PO or Contract Line Item Amount
031424(2) ANNUAL EMISSION REPORT - 195802 055-050-586-520230- 3,449.19
Invoice Total: 3,449.19
3/8/2024 233,194.93
Invoice Description Account PO or Contract Line Item Amount
11631 CALPERS PAYROLL WARRANT 240307 011-000-000-210240 155,857.52
11631 CALPERS PAYROLL WARRANT 240307 055-000-000-210240 64,391.94
11631 CALPERS PAYROLL WARRANT 240307 056-000-000-210240 4,148.12
11631 CALPERS PAYROLL WARRANT 240307 058-000-000-210240 8,444.77
11631 CALPERS PAYROLL WARRANT 240307 059-000-000-210240 87.64
11631 CALPERS PAYROLL WARRANT 240307 011-000-000-210240 264.89
11631 CALPERS PAYROLL WARRANT 240307 011-010-130-523034 0.05
Invoice Total: 233,194.93
VENDOR - 714 - CALPERS PAYMENT # 17056
VENDOR - 1617 - UPS PAYMENT # 17018
VENDOR - 1158 - SOUTH COAST AQMD PAYMENT # 17028
VENDOR - 1158 - SOUTH COAST AQMD PAYMENT # 17029
VENDOR - 1617 - UPS PAYMENT # 17017
Page 47 of 50
.
.
Item 4 Page 49 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
3/7/2024 28,105.79
Invoice Description Account PO or Contract Line Item Amount
11637 DEFERRED COMPENSATION PAYROLL
WARRANT 240307
011-000-000-210220 14,747.89
11637 DEFERRED COMPENSATION PAYROLL
WARRANT 240307
055-000-000-210220 11,552.32
11637 DEFERRED COMPENSATION PAYROLL
WARRANT 240307
056-000-000-210220 1,223.08
11637 DEFERRED COMPENSATION PAYROLL
WARRANT 240307
058-000-000-210220 532.50
11637 DEFERRED COMPENSATION PAYROLL
WARRANT 240307
059-000-000-210220 50.00
Invoice Total: 28,105.79
3/8/2024 132,487.35
Invoice Description Account PO or Contract Line Item Amount
11634 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 240307
011-000-000-210210 78,077.53
11634 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 240307
055-000-000-210210 46,309.30
11634 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 240307
056-000-000-210210 2,892.44
11634 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 240307
058-000-000-210210 5,157.45
11634 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 240307
059-000-000-210210 50.63
Invoice Total: 132,487.35
3/8/2024 42,997.39
Invoice Description Account PO or Contract Line Item Amount
11632 STATE WITHHOLDING PAYROLL WARRANT
240307
011-000-000-210210 24,500.64
11632 STATE WITHHOLDING PAYROLL WARRANT
240307
055-000-000-210210 15,849.56
VENDOR - 1635 - EMPLOYMENT DEVELOPMENT DEPT PAYMENT # 17059
VENDOR - 7541 - MISSIONSQUARE RETIREMENT PAYMENT # 17057
VENDOR - 4075 - THE DEPARTMENT OF THE TREASURY PAYMENT # 17058
Page 48 of 50
.
.
Item 4 Page 50 of 52
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
11632 STATE WITHHOLDING PAYROLL WARRANT
240307
056-000-000-210210 1,127.13
11632 STATE WITHHOLDING PAYROLL WARRANT
240307
058-000-000-210210 1,495.64
11632 STATE WITHHOLDING PAYROLL WARRANT
240307
059-000-000-210210 24.42
Invoice Total: 42,997.39
3/7/2024 696,521.68
Invoice Description Account PO or Contract Line Item Amount
030724 PAYROLL DIRECT DEPOSIT 011-000-000-210110 429,813.46
030724 PAYROLL DIRECT DEPOSIT 055-000-000-210110 222,013.36
030724 PAYROLL DIRECT DEPOSIT 056-000-000-210110 12,915.93
030724 PAYROLL DIRECT DEPOSIT 058-000-000-210110 31,529.78
030724 PAYROLL DIRECT DEPOSIT 059-000-000-210110 249.15
Invoice Total: 696,521.68
PAYROLL DIRECT DEPOSIT
Page 49 of 50
.
.
Item 4 Page 51 of 52
EARLY CHECKS TOTAL ELECTRONIC TOTAL GRAND TOTAL
$ 196,419.07 $ 3,234,859.24 $ 3,431,278.31
$ 181,512.02 $ 5,842,944.71 $ 6,024,456.73
$ 86,662.55 $ 40,604.66 $ 127,267.21
$ 8,029.48 $ 97,476.79 $ 105,506.27
$ 19,614.36 $ 19,614.36
$ 9,080.00 $ 9,080.00
$ 481,703.12 $ 9,235,499.76 $ 9,717,202.88
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 128
DATE 04/16/2024
058 - WATER
059 - FIBER
095 - SEWC JPA
Total
FUND
011 - GENERAL
055 - LIGHT & POWER
056 - NATURAL GAS
Page 50 of 50 AM
.
.
Item 4 Page 52 of 52
City Council Agenda Report
Meeting Date:April 16, 2024
From:Carlos Fandino, City Administrator
Department:City Administration
Submitted by:Diana Figueroa, Management Analyst
Subject
Fire Department Activity Report
Recommendation
Receive and file the February 2024 Fire Department Activity Report.
Background
Attached is a copy of a Fire Department Activity Report which covers the period of February 1
through February 29, 2024. The report is provided by Los Angeles County Fire and consists of
incident details and a summary for the month.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Fire Department Activity Report – February 2024
.
.
Item 5 Page 1 of 1
LOS ANGELES COUNTY FIRE DEPARTMENT
CITY OF VERNON
FIRE STATISTICAL REPORT
FEBRUARY 2024
1
.
.
Item 5 Page 1 of 13
FIRES:
Incident
Date/Time
Basic Incident Basic Incident Full
Number (FD1) Address
Basic Incident
Type Code And Property Pre-
Description
(FD1.21)
Basic Basic
Property
Losses
Basic
Contents Pre-
Incident
Basic
Content
Losses
(FD1.36)
Basic
Primary
Station
Name
Basic Incident Basic Person
Address
Favorite
Involved
Postal Code
(FD3.18)
Incident
Value
(FD1.37)
(FD1.35)Value
(FD1.38)
Address Postal
Code (FD1.78)(FD1.4)
Basic Incident City Name (FD1.16): VERNON
Basic Incident Postal Code (FD1.19): 90058
02/03/2024 LAC24041856 East LEONIS
Boulevard and S
BOYLE AV
132 - Road freight
or transport
vehicle fire
2,500 LAC013
VERNON CA 90058
02/04/2024 LAC24042576 5000 South 132 - Road freight LAC052
PACIFIC Boulevard or transport
and S PACIFIC
BLVD VERNON CA
90058
vehicle fire
02/07/2024 LAC24046652
02/09/2024 LAC24048900
02/11/2024 LAC24051809
02/12/2024 LAC24053287
02/24/2024 LAC24068354
3000 East LEONIS
Boulevard VERNON vehicle fire
CA 90058
131 - Passenger 5,000 10,000 10,000 LAC013
LAC0523600 South SOTO
Street VERNON CA rubbish fire,
90058
118 - Trash or
contained
4641 HAMPTON
Street VERNON CA rubbish, trash or
90058
151 - Outside LAC052
waste fire
2590 HARRIETT
Street VERNON CA confined to
90058
113 - Cooking fire,1
0
1
0
LAC052
LAC052
container
South SANTA FE 151 - Outside 0
Avenue and E 26TH rubbish, trash or
ST VERNON CA
90058
waste fire
02/25/2024 LAC24068459 3338 East 130 - Mobile 8,000 1,000 1,000 LAC013
SLAUSON Avenue property (vehicle)
VERNON CA 90058 fire, other
2
.
.
Item 5 Page 2 of 13
Incident
Date/Time
Basic Incident Basic Incident Full Basic Incident
Type Code And Property Pre-
Description
(FD1.21)
Basic Basic
Property
Losses
(FD1.35)
Basic
Contents Pre-
Incident
Basic
Content
Losses
(FD1.36)
Basic
Primary
Station
Name
Basic Incident Basic Person
Number (FD1)Address Address
Favorite
Involved
Postal Code
(FD3.18)
Incident
Value
(FD1.37)
Value
(FD1.38)
Address Postal
Code (FD1.78)(FD1.4)
02/27/2024 LAC24071881 East VERNON
Avenue and S
150 - Outside
rubbish fire, other
LAC013
DOWNEY RD
VERNON CA 90058
Count: 9
TRANSPORTS:
Disposition Incident Patient Disposition (eDisposition.12)Number of Incidents
(ALS) Patient Treated, Transported
Canceled (Prior to Arrival At Scene)
Canceled on Scene (FD Not Needed)
11
11
26
5Canceled on Scene (Unable to Locate Patient)
Care Transferred to BLS 28
12Patient Refusal (AMA) - (No Transport)
CITY OF VERNON STATISTICS
FEBRUARY 2024 INCIDENT SUMMARY TYPES AND TOTALS:
Cad Initial Cad Incident Type
Description
Fire Initial Cad Incident Type
Description (FD1.86)
Basic Incident Type Code And
Description (FD1.21)
Number of
incidents
Property Loss Content
Loss
Acres
Burned
Basic Incident Type Category (FD1.21): (None)
Basic Incident City Name (FD1.16): VERNON
VEH VEH 1
Total: 1
Total: 1
Total: $0
Total: $0
Total: 0 Total: 0
Total: 0Total: 0
Basic Incident Type Category (FD1.21): 1 - Fire
Basic Incident City Name (FD1.16): VERNON
ALRA
GRS
ALRA
GRS
113 - Cooking fire, confined to container
151 - Outside rubbish, trash or waste fire
118 - Trash or rubbish fire, contained
150 - Outside rubbish fire, other
1
1
1
1
1
2
1
0$0
MISC1
MISC1
MISC1
RUB
MISC1
MISC1
MISC1
RUB
151 - Outside rubbish, trash or waste fire
151 - Outside rubbish, trash or waste fire
3
.
.
Item 5 Page 3 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 INCIDENT SUMMARY
Cad Initial Cad Incident Type
Description
Fire Initial Cad Incident Type
Description (FD1.86)
Basic Incident Type Code And
Description (FD1.21)
Number of
incidents
Property Loss Content
Loss
Acres
Burned
RUB RUB 154 - Dumpster or other outside trash
receptacle fire
1 $500
TREE
VEH
TREE
VEH
130 - Mobile property (vehicle) fire, other
131 - Passenger vehicle fire
1
1
2
$8,000
$5,000
$2,500
1,000
10,000
VEHL VEHL 132 - Road freight or transport vehicle fire
Total: 12 Total: $16,000 Total: 11,001
Total: 12 Total: $16,000 Total: 11,001
Total: 0
Total: 0
Basic Incident Type Category (FD1.21): 3 - Rescue & Emergency Medical Service Incident
Basic Incident City Name (FD1.16): VERNON
ASSLT ASSLT 321 - EMS call, excluding vehicle
accident with injury
1
1BLEEDABLEEDA321 - EMS call, excluding vehicle
accident with injury
CP
CP
CP
CP
300 - Rescue, EMS incident, other 1
3321 - EMS call, excluding vehicle
accident with injury
CVA
DB
CVA
DB
321 - EMS call, excluding vehicle
accident with injury
2
1321 - EMS call, excluding vehicle
accident with injury
DIAA
EMS
EMS
DIAA
EMS
EMS
300 - Rescue, EMS incident, other
300 - Rescue, EMS incident, other
1
1
2321 - EMS call, excluding vehicle
accident with injury
EYE
INJA
EYE
INJA
321 - EMS call, excluding vehicle
accident with injury
1
9321 - EMS call, excluding vehicle
accident with injury
INJB
INJB
INJB
INJB
311 - Medical assist, assist EMS crew 1
2321 - EMS call, excluding vehicle
accident with injury
INJB INJB 322 - Motor vehicle accident with injuries 1
1POISONPOISON321 - EMS call, excluding vehicle
accident with injury
SICKA
SICKB
STAB
SICKA
SICKB
STAB
321 - EMS call, excluding vehicle
accident with injury
1
2
1
321 - EMS call, excluding vehicle
accident with injury
321 - EMS call, excluding vehicle
accident with injury
4
.
.
Item 5 Page 4 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 INCIDENT SUMMARY
Cad Initial Cad Incident Type
Description
Fire Initial Cad Incident Type
Description (FD1.86)
Basic Incident Type Code And
Description (FD1.21)
Number of
incidents
Property Loss Content
Loss
Acres
Burned
TCA TCA 321 - EMS call, excluding vehicle
accident with injury
4
TCB
TCB
TCB
TCB
300 - Rescue, EMS incident, other 1
3321 - EMS call, excluding vehicle
accident with injury
TCB
TCB
TCB
TCB
322 - Motor vehicle accident with injuries 4
1324 - Motor vehicle accident with no
injuries.
TCSTR
UNC
TCSTR
UNC
321 - EMS call, excluding vehicle
accident with injury
1
3
2
321 - EMS call, excluding vehicle
accident with injury
WATER WATER 363 - Swift water rescue
363 - Swift water rescue
Total: 51 Total: $0 Total: 0 Total: 0
Basic Incident City Name (FD1.16): VERNON CO
WATER WATER 1
Total: 1
Total: 52
Total: $0
Total: $0
Total: 0
Total: 0
Total: 0
Total: 0
Basic Incident Type Category (FD1.21): 4 - Hazardous Condition (No Fire)
Basic Incident City Name (FD1.16): VERNON
HM HM 420 - Toxic condition, other 1
Total: 1
Total: 1
Total: $0
Total: $0
Total: 0
Total: 0
Total: 0
Total: 0
Basic Incident Type Category (FD1.21): 5 - Service Call
Basic Incident City Name (FD1.16): VERNON
EMS EMS 551 - Assist police or other governmental
agency
1
HYD HYD 522 - Water or steam leak 1
Total: 2
Total: 2
Total: $0
Total: $0
Total: 0
Total: 0
Total: 0
Total: 0
Basic Incident Type Category (FD1.21): 6 - Good Intent Call
Basic Incident City Name (FD1.16): VERNON
911 911 611 - Dispatched and cancelled en route
600 - Good intent call, other
1
2ALRA
ALRA
ALRAR
ALRWF
ALRA
ALRA
ALRAR
ALRWF
611 - Dispatched and cancelled en route
611 - Dispatched and cancelled en route
600 - Good intent call, other
16
1
1
5
.
.
Item 5 Page 5 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 INCIDENT SUMMARY
Cad Initial Cad Incident Type
Description
Fire Initial Cad Incident Type
Description (FD1.86)
Basic Incident Type Code And
Description (FD1.21)
Number of
incidents
Property Loss Content
Loss
Acres
Burned
ALRWF
ALRWFR
ALRWFR
EMS
ALRWF
ALRWFR
ALRWFR
EMS
611 - Dispatched and cancelled en route
600 - Good intent call, other
6
1
1
3
1
1
3
2
2
1
1
1
3
1
1
611 - Dispatched and cancelled en route
600 - Good intent call, other
INVI INVI 600 - Good intent call, other
INVI INVI 611 - Dispatched and cancelled en route
611 - Dispatched and cancelled en route
611 - Dispatched and cancelled en route
600 - Good intent call, other
INVO
MISC1
SICKB
SICKB
STRC
TCA
INVO
MISC1
SICKB
SICKB
STRC
TCA
611 - Dispatched and cancelled en route
611 - Dispatched and cancelled en route
611 - Dispatched and cancelled en route
600 - Good intent call, otherTCBTCB
TCT TCT 611 - Dispatched and cancelled en route
600 - Good intent call, otherUNCUNC
Total: 49
Total: 49
Total: $0
Total: $0
Total: 0 Total: 0
Total: 0Total: 0
Basic Incident Type Category (FD1.21): 7 - False Alarm & False Call
Basic Incident City Name (FD1.16): VERNON
ALRA
ALRA
ALRA
ALRA
ALRA
ALRA
700 - False alarm or false call, other
730 - System malfunction, other
3
1
1741 - Sprinkler activation, no fire -
unintentional
ALRA
ALRA
ALRA
ALRA
744 - Detector activation, no fire -
unintentional
1
3745 - Alarm system activation, no fire -
unintentional
ALRWF
ALRWF
ALRWF
ALRWF
ALRWF
ALRWF
700 - False alarm or false call, other
730 - System malfunction, other
1
1
1745 - Alarm system activation, no fire -
unintentional
INVI INVI 730 - System malfunction, other 1
Total: 13
Total: 13
Total: $0
Total: $0
Total: 0
Total: 0
Total: 0
Total: 0
Total: 0Total: 130 Total: $16,000 Total: 11,001
6
.
.
Item 5 Page 6 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 CITY DETAILS CITY DETAILS:
Alarm
Date Time
Basic Incident
Number (FD1)
Cad Initial Cad
Incident Type
Description
Incident Type Address Basic Incident Full
Street Address
Basic First
Arrived At Scene
Apparatus ID
Basic
Property
Losses
(FD1.35)
Basic
Content
Losses
(FD1.36)
02/01/24 LAC24039147 HYD 522 - Water or steam
leak
South ALAMEDA Street
and E 49TH ST VERNON
CA 90058
South ALAMEDA
Street and E 49TH ST
02/01/24
02/01/24
02/02/24
LAC24039555
LAC24039600
LAC24040152
HM 420 - Toxic condition,
other
3336 FRUITLAND Avenue 3336 FRUITLAND E13
E13
E52
VERNON CA 90058 Avenue
CP 300 - Rescue, EMS
incident, other
4540 East 50TH Street
VERNON CA 90058
4540 East 50TH
Street
ASSLT 321 - EMS call,
excluding vehicle
accident with injury
4305 South SANTA FE
Avenue VERNON CA
90058
4305 South SANTA
FE Avenue
02/03/24 LAC24041856 VEHL 132 - Road freight or
transport vehicle fire
East LEONIS Boulevard
and S BOYLE AV
VERNON CA 90058
East LEONIS
Boulevard and S
BOYLE AV
E13
E52
2,500
02/03/24
02/03/24
LAC24042417
LAC24042453
ALRWF 611 - Dispatched and
cancelled en route
4425 East 49TH Street
VERNON CA 90058
4425 East 49TH
Street
POISON 321 - EMS call,
excluding vehicle
accident with injury
2920 South SANTA FE
Avenue VERNON CA
90058
2920 South SANTA
FE Avenue
02/03/24
02/04/24
LAC24042468
LAC24042576
ALRA
VEHL
611 - Dispatched and
cancelled en route
3141 East 44TH Street
VERNON CA 90058
3141 East 44TH
Street
132 - Road freight or
transport vehicle fire
5000 South PACIFIC
Boulevard and S PACIFIC
BLVD VERNON CA 90058 PACIFIC BLVD
5000 South PACIFIC
Boulevard and S
E52
E1302/04/24
02/04/24
02/05/24
LAC24042847
LAC24042885
LAC24043984
INVI
ALRA
911
600 - Good intent call, 4425 East 49TH Street
other
4425 East 49TH
StreetVERNON CA 90058
611 - Dispatched and
cancelled en route
3141 East 44TH Street
VERNON CA 90058
3141 East 44TH
Street
611 - Dispatched and
cancelled en route
3810 South SANTA FE
Avenue VERNON CA
90058
3810 South SANTA
FE Avenue
02/05/24
02/05/24
LAC24044156
LAC24044187
ALRA 611 - Dispatched and
cancelled en route
4401 South DOWNEY
Road VERNON CA 90058
4401 South DOWNEY
Road
WATER 363 - Swift water
rescue
LOS ANGELES River and
BANDINI BLVD VERNON
CO CA 90058
LOS ANGELES River S13
and BANDINI BLVD
02/05/24 LAC24044197 INJA 321 - EMS call,
excluding vehicle
accident with injury
5050 EVERETT Court
VERNON CA 90058
5050 EVERETT Court T164
7
.
.
Item 5 Page 7 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 CITY DETAILS
Alarm
Date Time
Basic Incident
Number (FD1)
Cad Initial Cad
Incident Type
Description
Incident Type Address Basic Incident Full
Street Address
Basic First
Arrived At Scene
Apparatus ID
Basic
Property
Losses
(FD1.35)
Basic
Content
Losses
(FD1.36)
02/05/24
02/05/24
LAC24044212
LAC24044543
TCT 611 - Dispatched and
cancelled en route
ROSS Street and E 37TH
ST VERNON CA 90058
ROSS Street and E
37TH ST
E9
EYE 321 - EMS call,
excluding vehicle
accident with injury
3737 South SOTO Street
VERNON CA 90058
3737 South SOTO
Street
E52
02/05/24
02/07/24
02/07/24
LAC24044626
LAC24046452
LAC24046652
BLEEDA
WATER
VEH
321 - EMS call,
excluding vehicle
accident with injury
3851 South SOTO Street
VERNON CA 90058
3851 South SOTO
Street
E52
Q13
E13
363 - Swift water
rescue
BANDINI Boulevard and S
SOTO ST VERNON CA
90058
BANDINI Boulevard
and S SOTO ST
131 - Passenger
vehicle fire
3000 East LEONIS
Boulevard VERNON CA
90058
3000 East LEONIS
Boulevard
5,000 10,000
02/07/24
02/08/24
02/08/24
LAC24046848
LAC24047960
LAC24048250
ALRWF
ALRA
700 - False alarm or
false call, other
2825 East 44TH Street
VERNON CA 90058
2825 East 44TH
Street
611 - Dispatched and
cancelled en route
4401 South DOWNEY
Road VERNON CA 90058
4401 South DOWNEY
Road
STAB 321 - EMS call,
excluding vehicle
accident with injury
4412 South PACIFIC
Boulevard VERNON CA
90058
4412 South PACIFIC
Boulevard
S13
02/08/24 LAC24048610 TCB 600 - Good intent call, South DOWNEY Road and South DOWNEY Road E13
other E 45TH ST VERNON CA
90058
and E 45TH ST
02/09/24
02/09/24
02/09/24
LAC24048900
LAC24049146
LAC24049441
MISC1
ALRA
TCB
118 - Trash or rubbish 3600 South SOTO Street 3600 South SOTO
Street
E52
fire, contained VERNON CA 90058
611 - Dispatched and
cancelled en route
2929 East 44TH Street
VERNON CA 90058
2929 East 44TH
Street
321 - EMS call,
excluding vehicle
accident with injury
East 55TH Street and S
SANTA FE AV VERNON
CA 90058
East 55TH Street and E52
S SANTA FE AV
02/09/24
02/10/24
LAC24049552
LAC24050303
ALRWF
TCA
611 - Dispatched and
cancelled en route
2929 East 44TH Street
VERNON CA 90058
2929 East 44TH
Street
611 - Dispatched and
cancelled en route
South DOWNEY Road and South DOWNEY Road S13
DISTRICT BLVD VERNON and DISTRICT BLVD
CA 90058
02/10/24
02/10/24
LAC24050339
LAC24050342
ALRA 611 - Dispatched and
cancelled en route
3336 FRUITLAND Avenue 3336 FRUITLAND
VERNON CA 90058 Avenue
SICKB 600 - Good intent call, 4580 South PACIFIC
other
4580 South PACIFIC
Boulevard
E52
Boulevard VERNON CA
90058
8
.
.
Item 5 Page 8 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 CITY DETAILS
Alarm
Date Time
Basic Incident
Number (FD1)
Cad Initial Cad
Incident Type
Description
Incident Type Address Basic Incident Full
Street Address
Basic First
Arrived At Scene
Apparatus ID
Basic
Property
Losses
(FD1.35)
Basic
Content
Losses
(FD1.36)
02/11/24 LAC24051781 ALRA 600 - Good intent call, 3365 East SLAUSON 3365 East SLAUSON E13
AvenueotherAvenue VERNON CA
90058
02/11/24
02/11/24
02/11/24
LAC24051809
LAC24052333
LAC24052420
RUB 151 - Outside rubbish, 4641 HAMPTON Street 4641 HAMPTON
Street
E52
E13
E52
trash or waste fire VERNON CA 90058
ALRWF
TCB
730 - System
malfunction, other
4425 East 49TH Street
VERNON CA 90058
4425 East 49TH
Street
322 - Motor vehicle
accident with injuries
South SANTA FE Avenue
and E VERNON AV
South SANTA FE
Avenue and E
VERNON AVVERNON CA 90058
02/11/24
02/11/24
02/12/24
LAC24052444
LAC24052462
LAC24052568
ALRWF
INVI
611 - Dispatched and
cancelled en route
4425 East 49TH Street
VERNON CA 90058
4425 East 49TH
Street
730 - System
malfunction, other
4425 East 49TH Street
VERNON CA 90058
4425 East 49TH
Street
E13
E52UNC321 - EMS call,
excluding vehicle
accident with injury
South PACIFIC Boulevard
and S SANTA FE AV
VERNON CA 90058
South PACIFIC
Boulevard and S
SANTA FE AV
02/12/24
02/12/24
LAC24052749
LAC24052794
EMS
TCB
600 - Good intent call, 5370 South BOYLE 5370 South BOYLE
Avenue
E13
other Avenue VERNON CA
90058
322 - Motor vehicle
accident with injuries
LOMA VISTA Avenue and
DISTRICT BLVD VERNON and DISTRICT BLVD
CA 90058
LOMA VISTA Avenue E13
02/12/24
02/12/24
02/12/24
02/12/24
LAC24052860
LAC24053021
LAC24053287
LAC24053336
ALRWFR
ALRA
611 - Dispatched and
cancelled en route
2110 East 51ST Street
VERNON CA 90058
2110 East 51ST Street
611 - Dispatched and
cancelled en route
3055 East 44TH Street
VERNON CA 90058
3055 East 44TH
Street
ALRA 113 - Cooking fire,
confined to container
2590 HARRIETT Street
VERNON CA 90058
2590 HARRIETT
Street
E52
E52
1
ALRA 744 - Detector
activation, no fire -
unintentional
2360 East 48TH Street
VERNON CA 90058
2360 East 48TH
Street
02/12/24
02/13/24
02/13/24
LAC24053508
LAC24053907
LAC24054095
INJB
INJA
ALRA
321 - EMS call,
excluding vehicle
accident with injury
5685 South ALCOA
Avenue VERNON CA
90058
5685 South ALCOA
Avenue
E13
E52
E13
321 - EMS call,
excluding vehicle
accident with injury
3737 South SOTO Street
VERNON CA 90058
3737 South SOTO
Street
730 - System
malfunction, other
2037 East 38TH Street
VERNON CA 90058
2037 East 38TH
Street
9
.
.
Item 5 Page 9 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 CITY DETAILS
Alarm
Date Time
Basic Incident
Number (FD1)
Cad Initial Cad
Incident Type
Description
Incident Type Address Basic Incident Full
Street Address
Basic First
Arrived At Scene
Apparatus ID
Basic
Property
Losses
(FD1.35)
Basic
Content
Losses
(FD1.36)
02/14/24
02/14/24
LAC24055170
LAC24055709
TCB 324 - Motor vehicle
accident with no
injuries.
South BOYLE Avenue and South BOYLE Avenue E13
E 54TH ST VERNON CA
90058
and E 54TH ST
SICKB 600 - Good intent call, East 57TH Street and S
other
East 57TH Street and E52
S 2ND ST2ND ST VERNON CA
90058
02/14/24
02/14/24
LAC24055749
LAC24055776
ALRA
INJA
700 - False alarm or
false call, other
2231 East 49TH Street
VERNON CA 90058
2231 East 49TH
Street
E52
S13321 - EMS call,
excluding vehicle
accident with injury
5925 South ALCOA
Avenue VERNON CA
90058
5925 South ALCOA
Avenue
02/14/24
02/14/24
02/15/24
LAC24056018
LAC24056067
LAC24056825
TCA 321 - EMS call,
excluding vehicle
accident with injury
1 FRUITLAND Avenue and 1 FRUITLAND Avenue E13
S DOWNEY RD VERNON
CA 90058
and S DOWNEY RD
ALRA
SICKA
741 - Sprinkler
activation, no fire -
unintentional
5502 South ALCOA
Avenue VERNON CA
90058
5502 South ALCOA
Avenue
E13
E52321 - EMS call,
excluding vehicle
accident with injury
3301 SACO Street
VERNON CA 90058
3301 SACO Street
02/15/24
02/16/24
02/16/24
LAC24056836
LAC24057940
LAC24058299
ALRA
ALRA
TCB
611 - Dispatched and
cancelled en route
4820 East 50TH Street
VERNON CA 90058
4820 East 50TH
Street
611 - Dispatched and
cancelled en route
2825 East 44TH Street
VERNON CA 90058
2825 East 44TH
Street
322 - Motor vehicle
accident with injuries
South PACIFIC Boulevard
and E LEONIS BLVD
VERNON CA 90058
South PACIFIC
Boulevard and E
LEONIS BLVD
E52
E5202/16/24
02/17/24
02/17/24
02/18/24
02/18/24
LAC24058337
LAC24058722
LAC24059261
LAC24059942
LAC24060226
TCA
CP
321 - EMS call,
excluding vehicle
accident with injury
South SANTA FE Avenue
and E 25TH ST VERNON
CA 90058
South SANTA FE
Avenue and E 25TH
ST
321 - EMS call,
excluding vehicle
accident with injury
3278 East SLAUSON
Avenue VERNON CA
90058
3278 East SLAUSON S13
Avenue
EMS
EMS
ALRA
321 - EMS call,
excluding vehicle
accident with injury
FRUITLAND Avenue
VERNON CA 90058
FRUITLAND
Avenue
E13
E52551 - Assist police or
other governmental
agency
2425 East 30TH Street
VERNON CA 90058
2425 East 30TH
Street
745 - Alarm system
activation, no fire -
unintentional
5353 South DOWNEY
Road VERNON CA 90058
5353 South DOWNEY E13
Road
10
.
.
Item 5 Page 10 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 CITY DETAILS
Alarm
Date Time
Basic Incident
Number (FD1)
Cad Initial Cad
Incident Type
Description
Incident Type Address Basic Incident Full
Street Address
Basic First
Arrived At Scene
Apparatus ID
Basic
Property
Losses
(FD1.35)
Basic
Content
Losses
(FD1.36)
02/19/24
02/19/24
02/20/24
02/20/24
02/21/24
02/21/24
02/21/24
02/21/24
02/21/24
02/21/24
02/22/24
02/22/24
02/22/24
02/23/24
LAC24061240
LAC24061462
LAC24062292
LAC24063079
LAC24063580
LAC24063661
LAC24063676
LAC24063703
LAC24063796
LAC24064064
LAC24064814
LAC24064931
LAC24065455
LAC24066112
ALRA 745 - Alarm system
activation, no fire -
unintentional
4577 MAYWOOD Avenue
VERNON CA 90058
4577 MAYWOOD
Avenue
E13
E13
E13
S13
ALRA
INJB
INJA
ALRA
CVA
745 - Alarm system
activation, no fire -
unintentional
5701 South BOYLE
Avenue VERNON CA
90058
5701 South BOYLE
Avenue
311 - Medical assist,
assist EMS crew
4909 South ALCOA
Avenue VERNON CA
90058
4909 South ALCOA
Avenue
321 - EMS call,
excluding vehicle
accident with injury
2485 East VERNON
Avenue VERNON CA
90058
2485 East VERNON
Avenue
611 - Dispatched and
cancelled en route
5503 South BOYLE
Avenue VERNON CA
90058
5503 South BOYLE
Avenue
321 - EMS call,
excluding vehicle
accident with injury
4580 South PACIFIC
Boulevard VERNON CA
90058
4580 South PACIFIC
Boulevard
E52
E52
E52
E52
S13
S13
E52
E52
E163
TCB 300 - Rescue, EMS
incident, other
East LEONIS Boulevard
and S PACIFIC BLVD
VERNON CA 90058
East LEONIS
Boulevard and S
PACIFIC BLVD
TCB 322 - Motor vehicle
accident with injuries
South PACIFIC Boulevard
and E LEONIS BLVD
VERNON CA 90058
South PACIFIC
Boulevard and E
LEONIS BLVD
CVA 321 - EMS call,
excluding vehicle
accident with injury
3870 SEVILLE Avenue
VERNON CA 90058
3870 SEVILLE
Avenue
TCA 321 - EMS call,
excluding vehicle
accident with injury
4988 CORONA Avenue
VERNON CA 90058
4988 CORONA
Avenue
TCA 321 - EMS call,
excluding vehicle
accident with injury
1 South BOYLE Avenue
and E SLAUSON AV
VERNON CA 90058
1 South BOYLE
Avenue and E
SLAUSON AV
INVI 611 - Dispatched and
cancelled en route
3737 South SANTA FE
Avenue VERNON CA
90058
3737 South SANTA
FE Avenue
MISC1
ALRWFR
611 - Dispatched and
cancelled en route
BANDINI Boulevard and S
SOTO ST VERNON CA
90058
BANDINI Boulevard
and S SOTO ST
600 - Good intent call, 5015 DISTRICT Boulevard 5015 DISTRICT
other VERNON CA 90058 Boulevard
11
.
.
Item 5 Page 11 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 CITY DETAILS
Alarm
Date Time
Basic Incident
Number (FD1)
Cad Initial Cad
Incident Type
Description
Incident Type Address Basic Incident Full
Street Address
Basic First
Arrived At Scene
Apparatus ID
Basic
Property
Losses
(FD1.35)
Basic
Content
Losses
(FD1.36)
02/23/24
02/23/24
02/23/24
02/23/24
02/23/24
LAC24066174
LAC24066175
LAC24066845
LAC24067044
LAC24067058
SICKB 321 - EMS call,
excluding vehicle
accident with injury
2451 East 57TH Street
VERNON CA 90058
2451 East 57TH
Street
E52
E13EMS
INJB
CP
600 - Good intent call, 5500 South BOYLE
other
5500 South BOYLE
AvenueAvenue VERNON CA
90058
322 - Motor vehicle
accident with injuries
East 55TH Street and
MALABAR ST VERNON
CA 90058
East 55TH Street and E52
MALABAR ST
321 - EMS call,
excluding vehicle
accident with injury
1 South SANTA FE Avenue 1 South SANTA FE
and E 37TH ST VERNON
CA 90058
E52
E13
E52
Avenue and E 37TH
ST
DB 321 - EMS call,
excluding vehicle
accident with injury
2901 FRUITLAND Avenue 2901 FRUITLAND
VERNON CA 90058 Avenue
02/24/24
02/24/24
LAC24067484
LAC24067635
ALRA
INJA
700 - False alarm or
false call, other
2325 East 38TH Street
VERNON CA 90058
2325 East 38TH
Street
321 - EMS call,
excluding vehicle
accident with injury
5333 South DOWNEY
Road VERNON CA 90058
5333 South DOWNEY S13
Road
02/24/24
02/24/24
02/24/24
02/24/24
02/25/24
LAC24067682
LAC24067975
LAC24068224
LAC24068354
LAC24068459
INVO
EMS
UNC
GRS
TREE
611 - Dispatched and
cancelled en route
South ALAMEDA Street
and E 55TH ST VERNON
CA 90058
South ALAMEDA
Street and E 55TH ST
321 - EMS call,
excluding vehicle
accident with injury
HAMPTON Street and
FRUITLAND AV VERNON FRUITLAND AV
CA 90058
HAMPTON Street and E52
321 - EMS call,
excluding vehicle
accident with injury
FRUITLAND Avenue and
GIFFORD AV VERNON CA and GIFFORD AV
90058
FRUITLAND Avenue E163
E52151 - Outside rubbish, South SANTA FE Avenue
trash or waste fire
South SANTA FE
Avenue and E 26TH
ST
0 0
and E 26TH ST VERNON
CA 90058
130 - Mobile property
(vehicle) fire, other
3338 East SLAUSON
Avenue VERNON CA
90058
3338 East SLAUSON E13
Avenue
8,000 1,000
02/25/24
02/25/24
02/26/24
LAC24068462
LAC24068660
LAC24070150
VEH 6011 MALBURG Way
VERNON CA 90058
6011 MALBURG Way Q13
ALRA
TCSTR
611 - Dispatched and
cancelled en route
5203 South DOWNEY
Road VERNON CA 90058
5203 South DOWNEY E13
Road
321 - EMS call,
excluding vehicle
accident with injury
4801 South PACIFIC
Boulevard and E LEONIS
BLVD VERNON CA 90058 LEONIS BLVD
4801 South PACIFIC
Boulevard and E
E165
12
.
.
Item 5 Page 12 of 13
CITY OF VERNON STATISTICS
FEBRUARY 2024 CITY DETAILS
Alarm
Date Time
Basic Incident
Number (FD1)
Cad Initial Cad
Incident Type
Description
Incident Type Address Basic Incident Full
Street Address
Basic First
Arrived At Scene
Apparatus ID
Basic
Property
Losses
(FD1.35)
Basic
Content
Losses
(FD1.36)
02/26/24
02/26/24
02/26/24
02/27/24
02/27/24
02/27/24
02/27/24
02/28/24
LAC24070485
LAC24070603
LAC24070685
LAC24071634
LAC24071700
LAC24071727
LAC24071881
LAC24072086
INJB 321 - EMS call,
excluding vehicle
accident with injury
3046 East 50TH Street
VERNON CA 90058
3046 East 50TH
Street
E13
E52
E52
E52
E52
E52
E13
E52
UNC 321 - EMS call,
excluding vehicle
accident with injury
South PACIFIC Boulevard
and E 45TH ST VERNON
CA 90058
South PACIFIC
Boulevard and E 45TH
ST
STRC
EMS
611 - Dispatched and
cancelled en route
South SANTA FE Avenue
and E 26TH ST VERNON
CA 90058
South SANTA FE
Avenue and E 26TH
ST
600 - Good intent call, South SANTA FE Avenue
other
South SANTA FE
Avenue and E 26TH
ST
and E 26TH ST VERNON
CA 90058
TCB 321 - EMS call,
excluding vehicle
accident with injury
South ALAMEDA Street
and E VERNON AV
VERNON CA 90058
South ALAMEDA
Street and E VERNON
AV
TCB 600 - Good intent call, East VERNON Avenue and East VERNON
other S ALAMEDA ST VERNON Avenue and S
CA 90058 ALAMEDA ST
MISC1
SICKB
150 - Outside rubbish
fire, other
East VERNON Avenue and East VERNON
S DOWNEY RD VERNON
CA 90058
Avenue and S
DOWNEY RD
321 - EMS call,
excluding vehicle
accident with injury
3805 South SOTO Street
VERNON CA 90058
3805 South SOTO
Street
02/28/24
02/29/24
LAC24072442
LAC24073361
Count: 101
TCB
UNC
600 - Good intent call, 4401 South DOWNEY
other Road VERNON CA 90058
4401 South DOWNEY E13
Road
600 - Good intent call, 4580 East 49TH Street
other VERNON CA 90058
4580 East 49TH
Street
E13
13
.
.
Item 5 Page 13 of 13
City Council Agenda Report
Meeting Date:April 16, 2024
From:Freddie Agyin, Director of Health and Environmental Control
Department:Health and Environmental Control
Submitted by:Veronica Petrosyan, Deputy Director of Health and Environmental
Control
Subject
City of Vernon National Pollution Discharge Elimination System (NPDES) Permit Duly Authorized
Representatives
Recommendation
A. Adopt Resolution No. 2024-05 repealing Resolution No. 2014-06 related to the NPDES
Permit Authorized Representatives; and
B. Authorize the Director of Public Works, Director of Health and Environmental Control and the
General Manager of Vernon Public Utilities as duly authorized representatives, to sign, certify,
and electronically submit permit registration documents, notices of termination, and any other
documents, reports, or information required by the NPDES permit.
Background
Approximately 7250 permitted Municipal Separate Storm Sewer Systems (MS4s) exist
nationwide, operating under an NPDES permit. The NPDES permit requires permittees to
develop and implement a comprehensive Storm Water Management Program (SWMP) that must
include pollution prevention measures, treatment or removal techniques, monitoring, use of legal
authority, and other appropriate measures to control the quality of stormwater discharge to the
storm drains. The NPDES permit is issued to the County of Los Angeles and 84 cities by the
California Regional Water Quality Control Board, Los Angeles Region (Board).
The NPDES permits are issued for a five-year term and include required reports and responses
to the Board, which must be signed by a principal executive officer, ranking elected official, or a
duly authorized representative of a principal executive officer or ranking elected official. Even if
the principal executive officer (e.g., City Administrator) or ranking elected official (e.g., Mayor)
intends to sign the required reports and other information for the NPDES Permit, the City may
choose to have a duly authorized representative on file with the Board.
On March 4, 2014, the City adopted Resolution No. 2014-06 to designate the Director of
Community Services and Water and the Director of Light and Power as duly authorized
representatives. Departmental changes and staff title changes since then require new
designations for duly authorized representatives to reflect the correct city positions having
responsibility for the NPDES permit. Pursuant to Section 40 CFR 122.22 (a)(3), (b) and (b)(2),
signatories for permit applications and reports may be either a principal executive officer (City
Administrator) or ranking elected official or a duly authorized representative (specified by either
name or position) of that person. Since the City’s stormwater program responsibilities reside with
the Department of Public Works, Department of Health and Environmental Control, and Vernon
Public Utilities, the City Administrator desires to designate the Director of Public Works, Director
of Health and Environmental Control, and Vernon Public Utilities General Manager as duly
authorized representatives. While authorized representatives are permissible under the CFR
Section aforementioned, pursuant to Vernon Municipal Code Section 3.32.040, signatory
authority must be delegated by the City Council. As such, it would be appropriate for Council to
authorize said staff positions to sign, certify, and electronically submit permit registration .
.
Item 6 Page 1 of 2
documents, notices of termination, and any other documents, reports, or information required by
the NPDES permit.
Resolution No. 2024-05 repeals Resolution No. 2014-06 as the staff titles designated previously
are obsolete and future NPDES authorizations will be made by minute order.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Resolution No. 2024-05
.
.
Item 6 Page 2 of 2
RESOLUTION NO. 2024-05
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON
REPEALING RESOLUTION NO. 2014-06 RELATED TO THE NATIONAL
POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) PERMIT
AUTHORIZED REPRESENTATIVES
SECTION 1. Recitals.
A. On March 4, 2014, the City Council adopted Resolution No. 2014-06 authorizing
City staff to sign, certify, and electronically submit permit registration documents, notices
of termination, and any other documents, reports, or information which pertain to the City
of Vernon and on the City’s behalf required by (1) the Municipal National Pollutant
Discharge Elimination System (NPDES) Permit and any NPDES Permit related
documents, and (2) the General Construction Activities Stormwater NPDES Permit as it
relates to Public Utilities projects.
B. By memorandum dated April 16, 2024, the Director of Health & Environmental
Control has recommended that City Council adopt a resolution repealing Resolution No.
2014-06 because the staff titles therein are obsolete and future NPDES authorizations
will be made by minute order.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF VERNON AS FOLLOWS:
SECTION 2. The City Council of the City of Vernon finds and determines that the
above recitals are true and correct.
SECTION 3. The City Council of the City of Vernon hereby repeals Resolution
No. 2014-06.
/ / /
/ / /
/ / /
/ / /
.
.
Item 6 Page 1 of 2
Resolution No. 2024-05
Page 2 of 2
_______________________
SECTION 4. The Deputy City Clerk shall certify the passage and adoption of this
resolution and enter it into the book of original resolutions.
APPROVED AND ADOPTED April 16, 2024.
________________________
CRYSTAL LARIOS, Mayor
ATTEST:
YONNIE PARKER, Deputy City Clerk
(seal)
APPROVED AS TO FORM:
ZAYNAH N. MOUSSA, City Attorney
.
.
Item 6 Page 2 of 2
City Council Agenda Report
Meeting Date:April 16, 2024
From:Daniel S. Wall, P.E., Director of Public Works
Department:Public Works
Submitted by:Manuel Garcia, Deputy Director of Public Works
Subject
Arbor Day Proclamation and Application for Tree City USA 2024
Recommendation
A. Proclaim April 26, 2024 as Arbor Day in the City of Vernon;
B. Authorize the Public Works Department to apply to the Arbor Day Foundation for Tree City
USA 2024 certification; and
C. Authorize the Mayor to sign the 2024 Tree City USA Application for Certification when it
becomes available.
Background
Arbor Day originated in Nebraska City, Nebraska in 1872. The Nebraska State Board of
Agriculture accepted a resolution by J. Sterling Morton "to set aside one day to plant trees, both
forest and fruit." Since then, all 50 states have passed legislation adopting Arbor Day, which is
celebrated on a date appropriate for tree planting in each state's respective region. California's
official Arbor Day is recognized annually on March 7, however, the benefits of trees may be
celebrated at any time of year. The City’s proclamation coincides with National Arbor Day which
falls on April 26, 2024.
It is recommended that City Council proclaim April 26, 2024, as Arbor Day in the City of Vernon.
Additionally, staff seeks Council's authorization to apply for Tree City USA designation as
provided by the Arbor Day Foundation.
On November 19, 2019, the City adopted Ordinance No. 1263, the "Tree Ordinance," which
establishes that the Director of Public Works shall be responsible for the enforcement of the Tree
Ordinance and the maintenance of City-owned trees. Furthermore, the Public Works Department
(Department) maintains a budget of $100,000 (close to $500 per capita) for tree planting and
maintenance. The Department continues to maintain and expand the City’s urban forest,
recognizing the importance of trees as a source of beauty and comfort that creates a healthy
living environment, promotes energy conservation, and improves air quality.
The Arbor Day Foundation is a national non-profit organization dedicated to planting trees and
improving the environment. The Arbor Day Foundation, in partnership with the U.S. Forest
Services and National Association of State Foresters, recognizes cities throughout the nation
under its Tree City USA program. The Department seeks City Council authorization to submit an
application to the Arbor Day Foundation for the City of Vernon to be designated a Tree City USA
for the fifth year. There are four (4) requirements that must be met prior to submittal of a Tree
City USA application to ensure that every qualifying community has a viable tree management
program. The City has already met the first three requirements and by proclaiming April 26, 2024,
as Arbor Day in Vernon, the City will have fulfilled all four of the requirements noted below:
1) Designate a responsible Tree Board/Department;
2) Possess an adopted Tree Ordinance;
3) Implement a Community Forestry Program with an annual budget of at least $2 per capita;
.
.
Item 7 Page 1 of 2
and
4) Proclaim and Observe Arbor Day.
The City of Vernon was honored with the Tree City USA designation in past years. The proposed
application would be submitted for the City to be considered for certification as a Tree City USA
for the year 2024.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. 2024 Arbor Day Proclamation
.
.
Item 7 Page 2 of 2
~
/~"'
"~ ..~
VET -~
~~.~~ `~
~, ~ F O R N i ,~1
A PROCLAMATION OF THE MAYOR AND THE CITY COUNCIL OF THE CITY OF
VERNON DECLARING APRIL 26, 2024 AS ARBOR DAY
WHEREAS, in 1872, the Nebraska Board of Agriculture established a special day to be set
aside for the planting of trees; and
WHEREAS, this holiday, called Arbor Day, was first observed with the planting of more
than a million trees in Nebraska; and
WHEREAS, trees are an important tool in combating climate change by reducing the
erosion of our precious topsoil by wind and water, cutting heating and cooling costs,
moderating the temperature, cleaning the air, producing life-giving oxygen, and providing
habitats for wildlife; and
WHEREAS, the City of Vernon recognizes the importance of trees in our daily lives as a
source of beauty and comfort by improving community appearance, creating a healthier living
environment, promoting energy conservation, moderating temperature and providing shade,
heat reflection and wind protection, and improving air quality; and
WHEREAS, the City of Vernon is committed to continuing its tree-planting endeavors; and
WHEREAS, to promote community awareness of the importance of trees, the Mayor and
City Council of the City of Vernon, on behalf of its employees, residents, and businesses,
encourage all citizens to plant trees to promote the wellbeing of present and future
generations.
NOW, THEREFORE, THE MAYOR AND THE CITY COUNCIL OF THE CITY OF VERNON, ON
BEHALF OF ITS EMPLOYEES, RESIDENTS AND BUSINESSES HEREBY DECLARES APRIL 26, 2024, AS ARBOR
DAY. THIS PROCLAMATION IS BEING PRESENTED BY THE HONORABLE MAYOR CRYSTAL LARIOS FOR
AND ON BEHALF OF THE CITY COUNCIL OF THE CITY OF VERNON THIS 16TH OF APRIL, TWO
THOUSAND AND TWENTY-FOUR.
CITY OF VERNON
CRYSTAL LARIOS, Mayor
.
.
Item 7 Page 1 of 1
City Council Agenda Report
Meeting Date:April 16, 2024
From:Daniel S. Wall, P.E., Director of Public Works
Department:Public Works
Submitted by:Lissette Melendez, Project Engineer
Subject
Contract with Bear Electrical Solutions, Inc. for Citywide Traffic Signal Maintenance and Repair
FY 2024 Project - Contract No. 20240283
Recommendation
A. Find that the proposed action is categorically exempt from California Environmental Quality
Act (CEQA) review, in accordance with CEQA Guidelines Section 15301, because the project
consists of the maintenance, repair or minor alteration of existing traffic signals and involves
negligible or no expansion of an existing use;
B. Accept the bid from Bear Electrical Solutions, Inc. (Bear Electrical) as the lowest responsive
and responsible bidder, and reject all other bids;
C. Approve and authorize the City Administrator to execute a contract with Bear Electrical in
substantially the same form as submitted, for the Citywide Traffic Signal Maintenance and Repair
FY 2024 Project, in an amount not-to-exceed $200,000 per year for a total of $600,000 over the
three-year term of Contract No. 20240283; and
D. Authorize a contingency of ten percent (10%) or $60,000 in the event of an unexpected
changed condition or additional extraordinary maintenance and grant authority to the City
Administrator to issue a change order for an amount up to the contingency amount, if necessary.
Background
The City of Vernon currently operates 42 traffic signals and requires the services of a vendor that
can provide monthly inspection and maintenance services for the City’s traffic signals. In addition,
the vendor must be capable of performing emergency repairs on damaged or non-functioning
equipment at all locations including repair or replacement of failed components and the
emergency replacement of equipment damaged by vehicular accidents. This extraordinary work
will be performed on an on-call basis available 24 hours a day, 7 days a week.
In accordance with Vernon Municipal Code (VMC) Section 3.32.070, on February 13, 2024, the
City Administrator authorized the advertisement of the Notice Inviting Sealed, Competitive Bids
for the Citywide Traffic Signal Maintenance and Repair FY 2024 Project. The Notice Inviting Bids
was advertised on the Planetbids online platform and published in the Huntington Park Bulletin.
The Notice Inviting Bids published included the City’s standard contract template as approved by
the City Council. The bids for Contract No. 20240283, Citywide Traffic Signal Maintenance and
Repair FY 2024 Project, were received and opened on March 6, 2024. The calculated results
were as follows:
1. Bear Electrical Solutions, Inc. $ 339,250.00
2. Crosstown Electrical & Data $ 351,902.00
4. Yunex Traffic $ 502,259.00
Staff reviewed the bids received and deemed the bid received from Bear Electrical was the lowest
responsive and responsible bid. Accordingly, staff recommends that a contract agreement be
awarded to Bear Electrical in the amount of $600,000. Bids were used for comparison purposes
only, as the actual scope of work is not definitively known. Staff defined an assortment of general .
.
Item 8 Page 1 of 2
services to determine a low bidder because exact quantities and types of services needed are
unpredictable. Under the proposed contract, the City of Vernon will pay $47,880.00 per year for
preventative maintenance. The remaining funds will be used towards extraordinary (emergency)
work, which will be based on actual time and materials established by the unit prices
provided. Additionally, staff recommends the authorization of a $60,000 contingency in the event
of unexpected changed conditions or extraordinary maintenance.
The proposed contract has been reviewed and approved as to form by the City Attorney’s Office.
Fiscal Impact
The fiscal impact is not-to-exceed $660,000 for the three-year term of the contract, including a
contingency amount of $60,000. Sufficient funds are available in the General Fund, Public Works
Department, Street Maintenance Division, Repairs and Maintenace Account No. 011-040-430-
529000 for the current fiscal year and will be budgeted in subsequent fiscal years.
Attachments
1. Contract No. 20240283: Citywide Traffic Signal Maintenance & Repair FY2024
.
.
Item 8 Page 2 of 2
STANDARD FORM OF
CONSTRUCTION CONTRACT BETWEEN
CITY AND CONTRACTOR
This Agreement is made and entered into at Vernon, California this 1st day of May , 2024, by and
between the CITY OF VERNON, a California charter City and municipal corporation (hereinafter "City") and Bear
Electrical Solutions, Inc., a California corporation (hereinafter "Contractor"), for construction of Citywide Traffic Signal
Maintenance & Repair FY2024, Contract No. 20240283.
THE PARTIES HERETO AGREE AS FOLLOWS:
1.CONTRACT DOCUMENTS
The “Contract Documents” except for modifications issued after execution of this Agreement, shall consist of the
following documents which are either attached hereto as exhibits or are incorporated into this Agreement by this
reference, with the same force and effect as if set forth at length herein:
A. Governmental Approvals including, but not limited to, permits required for the Work
B. This Agreement
C. Exhibit A – General Conditions
D. Exhibit 1 – Performance Bond
E. Exhibit 2 – Payment Bond
F. Exhibit 3 – Maintenance Bond
G. Exhibit 4 – Insurance Requirements
H. Exhibit 5 – Statement of Intent to Comply with Minimum Requirements of the Stormwater Permit
I. Exhibit B – Special Provisions Specific for this Project
J. Exhibit C – Equal Employment Opportunity Practices Provisions
K. Notice Inviting Bids
L. Instructions to Bidders
M. Bid Forms
N. Designation of Subcontractors
Page 1 of 120
.
.
Item 8 Page 1 of 221
O. Bidding Addenda Nos. 1_
REFERENCE DOCUMENTS2.
The following Reference Documents are not considered Contract Documents and were provided to the Contractor for
informational purposes. Contractor may rely upon the technical data contained in such documents but not upon non-
technical data, interpretations, opinions or provisional statements contained therein:
A. None
3.SCOPE OF WORK
Within the Contract Time and for the stated Contract Sum, subject to adjustments thereto, and pursuant to the Contract
Documents, the Contractor shall perform and provide all necessary: labor; services; supervision; materials; tools;
equipment; apparatus; facilities; supplies; tools; permits, inspections, plan checks, and similar Governmental
Approvals; temporary utilities; utility connections; and transportation necessary to complete the Work in strict conformity
with the Contract Documents for:
Citywide Traffic Signal Maintenance & Repair FY2024
Contract No. 20240283
4.TIME FOR PERFORMANCE
Contract Time. Contractor shall achieve Substantial Completion of the Work within 1095 calendar days from
the Date of Commencement established in City’s written Notice to Proceed (“Contract Time”), subject to adjustment in
accordance with the Contract Documents. Contractor shall achieve Final Completion of the Work, within the time
established by the Certificate of Substantial Completion issued by the City. The Contract Time may only be adjusted
as permitted by this Construction Contract and the General Conditions.
Time is of the essence of this Agreement. Except when the Contract Documents state otherwise, time is of
the essence in the performance of the Work. Contractor acknowledges that the time limits and deadlines set forth in
the Contract Documents are reasonable for Contractor to perform and complete the Work.
Liquidated Damages. If Contractor fails to achieve Substantial Completion of the entire Work within the
Contract Time for Substantial Completion, Contractor shall pay City as liquidated damages the amount of five-hundred
dollars ($500) per day, with respect to Contractor’s non-completion of the monthly Routine Maintenance Inspection
Page 2 of 120
.
.
Item 8 Page 2 of 221
.
.
Item 8 Page 3 of 221
.
.
Item 8 Page 4 of 221
.
.
Item 8 Page 5 of 221
EXHIBIT A
GENERAL CONDITIONS
ARTICLE 1 - PRELIMINARY PROVISIONS
1.01 DEFINITIONS
The following words shall have the following meanings:
A.Allowance. A line item cost estimate established by the City to be carried in the Base Bid sum, Contract
Sum, and Schedule of Values for Payment for a particular item of Work, which cannot be sufficiently
defined so as to allow the Contractor to adequately determine fair value before the Bid Deadline.
Allowances include estimated amounts established by the City for certain construction elements that
have not yet been fully designed or authorized for inclusion in the Work or to permit deferred approval
or selection of actual materials and equipment to a later date when additional information is available
for evaluation.
B.As-Builts. The documents prepared by Contractor showing the condition of the Work as actually
built, including, without limitation, all changes and the exact locations of all mechanical, electrical,
plumbing, HVAC or other portions of the Work that are shown diagrammatically in the Contract
Documents.
C.
D.
E.
Base Bid. The total sum stated in the Bid Form for which the Bidder offers to perform Work described
in the Contract Documents as the base Contract Work (e.g. not designated as part of a Bid Alternate).
Bid. A complete and properly executed offer by the Bidder on City-prescribed forms to perform the
Work for the prices stated in response to the Notice Inviting Bids.
Bid Alternate. An item of Work described in the Contract Documents as an Alternate Bid that will be
added to or deducted from the Base Bid and the Contractor’s responsibility only if the City accepts
the Bid Alternate.
F.Bid Forms: The City-prescribed forms which the Bidder shall complete and use to submit a Bid. The
Bid Forms include: (1) Bidder’s Proposal; (2) Schedule of Bid Prices; (3) Incumbency Certificate; (4)
Bid Bond; (5) Bidder’s Statement of Qualifications; (6) Experience Form; (7) Trades Experience
Form; (8) Contractor Safety Questionnaire; (9) Designation of Subcontractors; (10) Affidavit of Non-
Collusion; (11) Insurance Requirements Affidavit; and (12) forms included in the Specification
required by the type of project funding (e.g. federal, ARRA, HUD, etc.).
G.
H.
Bidder. The individual, partnership, firm, corporation, joint venture or other legal entity submitting a bid
on these Contract Documents or any part thereof.
Bidding Documents. Bidding Documents include the Bidding Requirements and the proposed Contract
Documents. The Bidding Requirements consist of: (1) Notice Inviting Bids; (2) Instructions to Bidders;
and (3) Bid Forms. The proposed Contract Documents consist of: (1) the Bidding Requirements; (2)
the Construction Contract Between City and Contractor; (3) the Conditions of the Contract (General,
Supplementary, and Special, if applicable); (4) all Exhibits to the Contract; (5) the Drawings; (6) the
Specifications; (7) all Addenda issued prior to the execution of the Construction Contract; (8) all
Modifications issued after the execution of the Construction Contract; and (9) Governmental Approvals,
if any, including but not limited to, permits.
Page 4 of 120
.
.
Item 8 Page 6 of 221
I.Change Order. A Change Order is a written document prepared by the City reflecting the agreement
between the City and Contractor for: a change in the terms or conditions of the Contract, if any; a
specific Scope Change in the Work; the amount of the adjustment, if any, in the Contract Sum; and
the extent of the adjustment, if any, in the Contract Time.
J.Change Order Request (COR). A Change Order Request is a written document originated by the
Contractor, which describes an instruction issued by the City after the effective date of the Contract,
which Contractor believes to be a scope change that may result in changes to the Contract Sum or
Contract Time or, which describes the need for or desirability of a change in the Work proposed by
Contractor.
K.City or Owner. The City of Vernon, California, acting through its City Council or other City officials
authorized to act for the City, acting in its proprietary rather than regulatory capacity in connection with
the Project.
L.Construction Change Directive. A written order prepared and signed by the City directing a change in
Work prior to agreement on adjustment, if any, in the Contract Sum or Contract Time, or both.
M.Contract Documents. The Contract Documents are enumerated in the Construction Contract
between City and Contractor and consist of: (1) the Bidding Requirements; (2) the Construction
Contract; (3) the Conditions of the Contract (General, Supplementary, and Special, if applicable); (4)
all Exhibits to the Contract; (5) the Drawings; (6) the Specifications; (7) all Addenda issued prior to the
execution of the Contract; (8) all Modifications issued after the execution of the Contract; and (9)
Governmental Approvals, including, but not limited to, permits. The intent of the Contract Documents
is to include all items necessary for the proper execution and completion of the Work by the
Contractor. The Contract Documents are complementary, and what is required by one shall be as
binding as if required by all; performance by the Contractor shall be required to the extent consistent
with the Contract Documents and reasonably inferable from them as being necessary to produce the
indicated results.
N.Contract. The Contract Documents form the Contract for Construction. The Contract Represents
the entire and integrated agreement between the parties hereto and supersedes prior negotiations,
representations, or agreements, either written or oral. The Contract may be amended or modified
on by a Modification. The Contract Documents shall not be construed to create a contractual
relationship of any kind between any persons or entities other than the Owner and the Contractor.
There shall be no third party beneficiaries of the Contract Documents.
O.
P.
Contract Sum. The total amount of compensation stated in the Construction Contract that is payable
to Contractor for the complete performance of the Work in accordance with the Contract Documents.
Contract Time. The total number of days set forth in the Construction Contact within which
Substantial Completion of the Work must be achieved beginning with the Date of Commencement
established in the Notice to Proceed, subject to adjustments in accordance with the terms of the
Contract Documents. The Contract Time for Contractor's performance of the Work is measured in
calendar days (not work days).
Q.Contractor. The individual, partnership, firm, corporation, joint venture or other legal entity with whom
the Contract is made by City, or the agent or legal representative who may be appointed to represent
such individual, partnership, firm, corporation, joint venture or other legal entity in the execution of the
Contract as general contractor for construction of the Work.
Page 5 of 120
.
.
Item 8 Page 7 of 221
R.
S.
T.
Correction Period. Correction Period is synonymous with the terms of the correction guarantee period
used in the Contract Documents.
Date of Commencement. The date for commencement of the Work fixed by City in a Notice to
Proceed to Contractor.
Day. The terms “day” or “days” mean calendar days unless otherwise specifically designated in the
Contract Documents. The term “Work Day” or “Working Day” shall mean any calendar day except
Saturdays, Sundays and City recognized legal holidays. City Holidays are as follows:
1. January 1st – New Year’s Day
2. The 3rd Monday in January – Martin Luther King, Jr. Day
3. The 3rd Monday in February – Presidents Day
4. March 31st – Cesar Chavez Day
5. The last Monday in May – Memorial Day
6. July 4th – Independence Day
7. The first Monday in September – Labor Day
8. The second Monday in October – Indigenous Peoples’ Day
9. November 11th – Veterans Day
10. The 4th Thursday in November – Thanksgiving Day
11. December 24th – Christmas Eve
12. December 25th – Christmas Day
13. December 31st – New Year’s Eve
U.
V.
Director. The Director of the Public Works Department of the City of Vernon or his/her duly appointed
representative.
Drawings. The Drawings are the graphic and pictorial portions of the Contract Documents showing the
design, location, and dimensions of the Work, generally including plans, elevations, sections, details,
schedules, and diagrams.
W.Extra Work. New or unforeseen work will be classified as Extra Work when determined by the City
that the work is not described in, or reasonably inferable from, the Contract Documents, the work is
not covered by any Bid line item or Allowance, and the work causes Contractor to incur additional
and unforeseen costs.
X.
Y.
Field Directive. See, “Work Directive.”
Final Completion. Final Completion is the stage of performance of the Work when (1) all Work
required by the Contract Documents has been fully completed in compliance with the Contract
Documents and all applicable laws including, but not limited to, correction or completion of all punch
list items noted by City upon Substantial Completion; (2) Contractor has delivered to City an
Application for Final Payment and all closeout documentation required by the Contract Documents;
and (3) documentation of all final Governmental Approvals has been submitted to City including, but
not limited to a final Certificate of Occupancy or equivalent Building Department sign-off has been
issued covering the entire Project site without exception or conditions.
Z.Force Majeure. “Force Majeure” includes but is not limited to declared or undeclared war, sabotage,
insurrection, riot, or other acts of civil disobedience, labor disputes, fires, explosions, floods,
earthquakes or other acts of God.
Page 6 of 120
.
.
Item 8 Page 8 of 221
AA.
BB.
Fragnet. The sequence of new activities that are proposed to be added to an existing schedule.
Governmental Approval. Any approval, authorization, inspection, certification, consent, exemption,
filing, permit, registration, plan check, ruling or similar authorization required by any federal, state or
local law, regulation or procedures in order for Contractor to perform the Work.
CC.Guarantee. Assurance to City by Contractor or product manufacturer or other specified party, as
guarantor, that the specified warranty will be fulfilled by the guarantor in the event of default by the
warrantor.
DD.
EE.
FF.
GG.
HH.
II.
Modification. A Modification is: (1) a written amendment to Contract signed by both parties; (2) a
Change Order; or (3) a Construction Change Directive.
Notice to Proceed. The Notice to Proceed is a document issued by the City fixing the date for
Commencement for the Work.
Parties. The City and Contractor may be referred to in the Contract Documents from time to time as
the Parties.
Permit Fees. Governmental Approvals and Utility Fees as required by any agency to be paid by the
City of Vernon.
Permit Fees Reimbursement. A payment made to the Contractor by the City in addition to the Contract
Sum to compensate Contractor for the actual direct cost of all Permit Fees.
Project. The Project is the total construction of which the Work performed under the Contract
Documents may be the whole or a part and which may include construction by the City or by separate
contractors.
JJ.Project Manual/Contract Package. The volumes of Contract Documents and reference documents
assembled for the Work made available to Bidders.
KK.Record Documents. The Drawings, Specifications, addenda, requests for information, bulletins,
Change Orders and other modifications to the Contract Documents, approved shop drawings,
product data, samples, mock-ups, permits, inspection reports, test results, daily logs, schedules,
subcontracts, and purchase orders. Records Documents shall include a set of “As-Built” Drawings
and Specifications, which shall be continuously updated during the prosecution of the Work.
LL.Site. The physical area designated in the Contract Documents for Contractor's performance of the
Work.
MM.Specifications. The Specifications are the volume(s) assembled for the Work that includes, without
limitation, the Bidding Documents, the Construction Contract and Exhibits, the General Conditions,
Supplementary and/or Special Conditions, if any, the “GREENBOOK” STANDARD
SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (2021 Edition), the Standard Plans for
Public Works Construction (2021 Edition), State of California, Department of Transportation
Standard Plans (2022 Edition) and State of California, Department of Transportation Standard
Specifications (2018 Edition), and the City of Vernon Standard Plans.
NN.Specifications. The Specifications are that portion of the Contract Documents consisting of the
written requirements for materials, equipment, systems, standards, and workmanship for the Work
Page 7 of 120
.
.
Item 8 Page 9 of 221
and performance of related services, including, but not limited to, the Project Technical
Specifications, Standard Specifications, if any, and any applicable Trade Association Specifications.
OO.Substantial Completion. Substantial Completion is defined to mean the stage in the progress of the
Work when the Work is sufficiently complete in accordance with the Contract Documents as
determined by the City so that the City can occupy and utilize the Work for its intended use and as
further defined in the Contract Documents.
PP.Unilateral Change Order. See “Work Directive.”
QQ.Utility Fees. The fees charged by any public, private, cooperative, municipal and/or government line,
facility or system used for the carriage, transmission and/or distribution of cable television, electric
power, telephone, water, gas, oil, petroleum, steam, chemicals, sewage, storm water or similar
commodity including, but not limited to fees for temporary utilities and refuse hauling.
RR.
SS.
Warranty. Assurance to City by contractor, installer, supplier, manufacturer or other party responsible
as warrantor, for the quantity, quality, performance and other representations of a product, system
service of the Work.
Work. The term "Work" means the construction and other services required by, and reasonably
inferable from the Contract Documents, whether completed or partially completed, and includes all
other labor, materials, equipment, and services provided or to be provided by the Contractor to fulfill
the Contractor's obligations. The Work may constitute the whole or a part of the Project.
TT.Work Directive. A Work Directive is a unilateral written order issued by the City directing Contractor
to continue performance of the Work or to perform a disputed change in the Work prior to agreement
or adjustment, if any, in the Contract Sum, Contract Time, or both.
1.02 REPRESENTATIVES
A.The Director shall be the representative of the City and, except as otherwise expressly provided
herein, shall make all decisions and interpretations to be made by the City under the provisions of the
Contract Documents.
B.The Contractor shall at all times be represented on the Work in person or by a duly designated agent.
Instructions and information given by the Director to the Contractor's agent on the Work shall be
considered as having been given to the Contractor.
1.03 PERMITS, INSPECTIONS, PLAN CHECKS, AND SIMILAR GOVERNMENTAL APPROVALS AND
UTILITIES
A.
B.
C.
D.
City of Vernon shall obtain all Governmental Approvals and Utility Fees required for the construction of
the project.
Contractor shall obtain a no-fee encroachment permit from the City of Vernon’s Public Works
Department.
All documents evidencing Contractor’s satisfaction with all Governmental Approvals and Utility Fees
must be submitted to the City prior to submission of the Application for Final Payment.
Where requirements of the Governmental Approvals differ from those of the Drawings and
Page 8 of 120
.
.
Item 8 Page 10 of 221
Specifications, the more stringent requirements shall apply.
LICENSES1.04
1.05
The Contractor shall apply for, obtain, and pay for all licenses required by governing authorities for the Work.
Contractor shall apply and pay for a City of Vernon business license.
ALLOWANCES
A.
B.
Contractor shall include in the Contract Sum and Schedule of Values for Payment, the City’s estimated
cost established for each Work item covered by an Allowance stated in the Contract Documents. See
Paragraph 1.01 for definition of Allowance.
The line item cost estimate established by the City for Work covered by an Allowance includes the cost
to Contractor of: all materials and equipment, preparation of submittals; labor; transportation; delivery;
handling; installation; supervision; overhead; profit; licenses; bonds; insurance; all sales, use and other
taxes legally chargeable; and all other costs and expenses incidental to such Work.
C.Work items covered by Allowances shall be supplied with such materials and equipment and for such
prices approved in advance by City. Contractor shall notify and request City’s approval of material
equipment, and pricing information for Work covered by an Allowance before ordering the material or
equipment and in sufficient time to avoid delay to the Work. City shall provide approval of materials,
equipment, and prices with reasonable promptness. The material, equipment, and pricing information
submitted by the Contractor to the City’s Project Manager shall, at a minimum, include product data
and detailed costs of material, equipment, and labor to complete such Work, itemized by costs incurred
by Contractor and each subcontractor associated with the performance of such Work. Contractor shall
not order materials or equipment or proceed with Work covered by an Allowance until the material,
equipment, and pricing information for such Work items have been submitted to the City’s Project
Representative for review and the Contractor has received City’s approval to proceed with a Work item
covered by an Allowance.
D.
E.
All expenditures for Allowance Work shall be separately itemized in each Application for Payment.
To the extent that the cost of Work items covered by an Allowance is less than the Allowance cost
estimate established by the City, the Contact Sum shall be reduced by Change Order or Construction
Change Directive to reflect the actual cost of the Allowance item. Similarly, to the extent the cost of
Work items covered by an Allowance is greater than the Allowance cost estimate, the Contract Sum
shall be increased by Change Order or Construction Change Directive to reflect the actual cost of the
Allowance item. If Work items covered by an Allowance are not performed or the City deletes such
items from the Scope of Work, the Contract Sum shall be reduced by Change Order or Construction
Change Directive to deduct the Cost of the unused Allowance item.
1.06
1.07
WAIVER
A waiver by City of any breach of any term, covenant, or condition contained in the Contract Documents shall
not be deemed to be a waiver of any subsequent breach of the same or any other term, covenant, or condition
contained therein, whether of the same or a different character.
DATA TO BE FURNISHED BY THE CONTRACTOR
The Contractor shall furnish the Director with such information as the Director may desire respecting the
Page 9 of 120
.
.
Item 8 Page 11 of 221
character of the materials and the progress and manner of the Work, including all information necessary to
determine the Contractor’s costs, such as the number of persons employed, their pay, the time during which
they worked on the various classes of construction, and other pertinent data.
1.08
1.09
CONTRACT DRAWINGS
The City will accept no responsibility for errors resulting from misinterpretation or scaling of the Drawings.
SPECIFICATIONS AND DRAWINGS
A.The Contractor shall keep on the Work Site a copy of all Specifications, Drawings, and Change
Orders pertaining to the Work and shall at all times give the Director access thereto. Anything
mentioned in the Specifications and not shown on the Drawings or shown on the Drawings and not
mentioned in the Specifications shall be of like effect as though shown or mentioned in both.
B.
C.
In general, the Drawings will show dimensions, positions, and kind of construction; and the
Specifications will define materials, quality, and standards. Any Work not particularly detailed,
marked or specified, shall be the same as similar parts that are detailed, marked or specified.
The Drawings shall not be scaled to determine dimensions, and in all cases shall be calculated from
figures shown on the Drawings. Any discrepancies between scale and figured dimensions, not
marked “not to scale,” must be brought to the Director’s attention before proceeding with the Work
affected by the discrepancy.
D.
E.
F.
Omissions from the Drawings and/or Specifications shall not relieve the Contractor from the
responsibility of furnishing, making, or installing all items required by law or code, or usually
furnished, made or installed in a project of the scope and general character indicated by the Drawings
and Specifications.
For convenience, the Drawings and Specifications may be arranged in various trade subparagraphs,
but such segregation shall not be considered as limiting the Work of any subcontract or trade. The
Contractor shall be solely responsible for all subcontract arrangements of the Work regardless of the
location or provision in the Drawings and Specifications.
The City will furnish free of charge to the Contractor, a maximum of six (6) sets of Contract Drawings
and Specifications. The Contractor shall pay for the costs of any additional sets or portions thereof.
The Contractor shall be responsible to see that all sets are the same as the up-to-date approved set.
1.10 PRECEDENCE OF CONTRACT DOCUMENTS
A.In the event of conflict between any of the Contract Documents, the provisions placing a more
stringent requirement on the Contractor shall prevail. The Contractor shall provide the better
quality or greater quantity of Work and/or materials unless otherwise directed by City in writing. In
the event none of the Contract Documents place a more stringent requirement or greater burden
on the Contractor, the controlling provision shall be that which is found in the document with higher
precedence in accordance with the following order of precedence:
1.
2.
Governmental Approvals including, but not limited to, permits required for the Work
Modifications issued after execution of the Contract (including modifications to Drawings
and Specifications)
Page 10 of 120
.
.
Item 8 Page 12 of 221
3.The Contract, including all exhibits, attachments, appendices and Addenda, with later
Addenda having precedence over earlier Addenda
Special Conditions, if any
General Conditions
Specifications
Drawings
4.
5.
6.
7.
8.Bidding Requirements
B.With reference to the Drawings, the order of precedence is as follows:
1.
2.
3.
4.
5.
6.
7.
8.
9.
Change Order Drawings
Addenda Drawings
Contract Drawings
Project Drawings
Standard Drawings
Detail Drawings
General Drawings
Figures
Scaled dimensions
C.Within the Specifications, the order of precedence is as follows:
1.
2.
3.
4.
5.
Change Orders
Special Conditions
Project Technical Specifications
Standard Specifications, if any
Applicable Trade Association Specifications
1.11 NOTICE OF CONFLICTS
If the Contractor, in the course of the Work, becomes aware of any claimed conflicts, errors or omissions in
the Contract Documents or in the City's fieldwork or work of City's separate contractors, the Contractor shall
immediately notify the Director in writing. The Director shall promptly review the matter, and if the Director
finds a conflict, error or omission, the Director shall determine the corrective actions and advise the Contractor
accordingly. If the correction associated with a conflict, error or omission increases or decreases the amount
of Work called for in the Contract, the City shall issue an appropriate Change Order in accordance with the
Contract Documents. After discovery of an error or omission by the Contractor, any related additional work
performed by the Contractor shall be done at the Contractor's risk unless authorized by the Director.
1.12 REPORTS
A.Daily Construction Reports: The Contractor shall prepare a daily construction report recording the
following information concerning events at Project site:
1.
2.
3.
4.
5.
6.
List of Subcontractors at Project site.
List of other contractors at Project site.
Approximate count of personnel at Project site.
Equipment at Project site.
Material deliveries.
High and low temperatures and general weather conditions, including presence of rain or
snow.
Page 11 of 120
.
.
Item 8 Page 13 of 221
7.Accidents.
8.Meetings and significant decisions.
9.Unusual events.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
Stoppages, delays, shortages, and losses.
Meter readings and similar recordings.
Emergency procedures.
Orders and requests of authorities having jurisdiction.
Change Orders received and implemented.
Construction Change Directives received and implemented.
Services connected and disconnected.
Equipment or system tests and startups.
Partial completions and occupancies.
Substantial Completions authorized.
List of visitors to Project Site.
List of personnel at Project Site including names and job classifications.
Description of Work for the day including locations, quantities and related bid items.
Immediately upon discovery of a difference between field conditions and the Contract Documents, the
Contractor shall prepare and submit a detailed report through a Request for Information (RFI). Include a
detailed description of the differing conditions, together with recommendations for a remedy.
The Daily Construction Report must be: signed by Contractor’s Superintendent, submitted within 24 hours
(next Working Day) to the Director, and shall be made available to others as directed by City.
1.13 LINES, GRADES, AND MEASUREMENTS
A.All lines and grades will be established by the Contractor. The Contractors shall carefully preserve all
survey stakes and reference points as far as possible. Should any stakes or points be removed or
destroyed unnecessarily by any act of the Contractor or his/her employees, they must be reset to the
satisfaction of the Director, at the Contractor's expense.
B.
C.
The Contractor shall inform the Director 48 hours (two Work Days) in advance of the times and places
at which he/she intends to Work in order that inspection may be provided, and that necessary
measurements for records and payments may be made with minimum inconvenience.
No direct payment will be made for the cost to the Contractor of any of the Work or delay occasioned
by giving lines and grades, by making other necessary measurements, or by inspection.
1.14 RIGHT OF WAY
A.The site for the installation of equipment or the right of way for the Work to be constructed under this
Contract will be provided by the City.
B.The City will provide the appropriate rights of way and property for pipelines and structures. Upon
approval by the Director, the Contractor may, without cost, use portions of any of the City's rights of
way or property which may be suitable for working space and for storage of equipment and
materials. The Contractor will be held responsible for any damage to structures, streets, and roads,
trees and landscaping, and for any damage that may result from his/her use of City property.
C.In case areas additional to those available on the City's rights of way or property are required by the
Contractor for his/her operations, he/she shall make arrangements with the property owners for the use
Page 12 of 120
.
.
Item 8 Page 14 of 221
of such additional areas at his/her own expense.
CONTRACTOR’S OPERATIONS/STORAGE YARD1.15
In the event the Contractor requires space for the storage and/or staging of construction materials, supplies,
equipment, stockpiling of debris, or any other needs required for construction operations, he/she shall acquire at
his/her own expense such areas as he/she may desire. For properties within the City of Vernon, the staging
area must be enclosed at Contractor’s expense with construction fencing covered with a mesh screen to limit
visibility to the site. Private property used for storage of construction material or debris shall be restored to a legal
condition with regard to appearance and maintenance upon conclusion of the project. Property should be graded
and free of weeds and debris when project is completed.
[END OF ARTICLE]
Page 13 of 120
.
.
Item 8 Page 15 of 221
ARTICLE 2 - PERFORMANCE OF THE WORK
2.01 PERFORMANCE OF WORK - GENERAL
Contractor shall, at its own cost and expense, furnish all necessary materials, labor, transportation, and
equipment for doing and performing said Work and the materials used shall comply with the requirements of the
Contract Documents. All Work shall be performed and completed as required in the Contract Documents, and
subject to the approval of the Director, or his/her designated assistant.
2.02
2.03
NO ASSIGNMENT OR DELEGATION
Contractor shall not assign or delegate the duties or obligations under this Contract or his/her interest therein in
whole or in part without the prior written consent of the City which may be withheld at the City's sole discretion.
STANDARD OF PERFORMANCE
Contractor agrees that all services performed hereunder shall be provided in a manner commensurate with the
highest professional standards and shall be performed by qualified and experienced personnel; that any Work
performed by Contractor under the Contract will be performed in the best manner; that any material furnished
shall be subject to the approval of the Director; and that both Work and materials will meet fully the requirements
of the Contract Documents. Any work deemed unacceptable by the Director, whether a cause is determined or
not shall be repaired or replaced by Contractor at Contractor’s expense.
The Contractor shall be responsible for the final product and shall make any quality control, adjustments and
corrections necessary to obtain the final product accepted by the City Engineer. The Contractor shall perform
process and quality control sampling and testing and exercise management control the work of his/her
subcontractors, technicians and workers to ensure that the milling, transporting, recycling, spreading,
compaction, and finishing processes conform to these Specifications. The proficiency of testing laboratories
and sampling and testing personnel shall be reviewed and approved by the City Engineer prior to providing
services to the project. The City Engineer shall have unrestricted access to the laboratory, sampling, testing
sites, and all information resulting from mix design and quality control activities. All Quality Control testing
results shall be submitted to the City Engineer on a daily basis.
2.04 DEFECTIVE WORK
Within the time periods that the City specifies, the Contractor shall correct all deficient, improperly executed, or
unsatisfactory Work determined by the City.
The Contractor shall remove and shall repair or replace, at his/her own expense any part of the Work that is
deficient, improperly executed, or unsatisfactorily executed, even though it has been included in the monthly
estimates. If he/she refuses or neglects to remove, repair, or replace such defective Work, prior to the City’s
acceptance of the Work, it may be replaced by the City at the expense of the Contractor, plus 15% for overhead
expenses, and his/her sureties shall be liable therefor. (See Paragraph 2.15 for curing defects after acceptance
of the Work.)
2.05 CITY’S RIGHT TO CARRY OUT THE WORK
A.Notwithstanding other remedies available to the City, if the Contractor defaults, fails to perform Work
required by the Contract Documents, or otherwise neglects to carry out the Work in accordance with
the Contract Documents and fails within a 48 hour period after receipt of written notice from the City to
commence and correct such default, failure to perform, or neglect with diligence and promptness, the
Page 14 of 120
.
.
Item 8 Page 16 of 221
City, at its sole discretion and without obligation, may, with its own or outside forces, perform the Work
Contractor has failed to perform and/or replace or correct deficiencies in the Work. In such case, a
Change Order or Construction Change Directive shall be issued deducting from payments then or
thereafter due to the Contractor the cost of completion, replacement or correction of such deficiencies,
including compensation for additional services by the City’s project management staff, the Architect,
and their respective consultants made necessary by such default, failure to perform, or neglect, plus
15% for City’s overhead expenses. If payments then or thereafter due the Contractor are not sufficient
to cover such amounts, the Contractor shall pay the difference to the City immediately. This remedy is
cumulative.
B.The City also has the right, but not the obligation, to self-perform or have outside forces perform portions
of the Work previously assigned to Contractor. In such case a Change Order or Construction Change
Directive shall be issued, reducing the Contract Sum by the Unit Price(s) applicable to such deleted
Work or, in the absence of Unit Prices, an amount that reflects the reasonable cost of performing such
deleted Work and the Allowable Mark-Up applicable to such deleted Work.
2.06 COMMUNICATIONS AND NOTICES REGARDING THE WORK
A. Notices under the Contract Documents shall be submitted in writing via email to Lissette Melendez
at lmelendez@cityofvernon.org or (a) delivered personally, (b) sent by certified mail, return receipt requested,
or (c) sent by a recognized overnight mail or courier service, with delivery receipt requested, to the following
addresses (or to such other address as may from time to time be specified in writing by such Person):
All correspondence with Contractor shall be sent to the following address:
Bear Electrical Solutions, Inc.
1252 State Street P.O. Box 924
Alviso, CA 95002
Attention:
Phone:
Email:
Robert Asuncion, Vice President
(408) 449-5178
estimating@bear-electrical.com
All communications shall be copied to City and shall be delivered to City’s Director at the address
set forth below, with copies to such additional persons as may be directed by City’s Director.
City of Vernon
Public Works Department
4305 Santa Fe Avenue
Vernon, CA 90058
Attention:
Phone:
Lissette Melendez, Project Engineer
(323) 583-8811 ext. 246
E-mail:lmelendez@cityofvernon.org
B.Notices shall be deemed received when actually received in the office of the addressee (or by the
addressee if personally delivered) or when delivery is refused, as shown on the receipt of the U. S.
Postal Service, private carrier or other Person making the delivery. All notices received after 5:00
p.m. shall be deemed received on the first business day following delivery. Any technical or other
communications pertaining to the Work shall be conducted by Contractor's Project Manager and
technical representatives designated by City. Contractor's representatives shall be available at all
Page 15 of 120
.
.
Item 8 Page 17 of 221
reasonable times for consultation, and shall be authorized to act on behalf of Contractor in matters
concerning the Work.
C.
D.
Contractor shall copy City on all written correspondence pertaining to the Contract between
Contractor and any Person other than Contractor's Subcontractors, consultants and attorneys.
Notification of Affected Residents/Businesses. The Contractor shall be responsible for distribution of
the general information letter of the project to all affected residents and businesses. A project general
information letter and sufficient copies thereof will be prepared by City staff for Contractor distribution
to all residents, business establishments, and institutions fronting on or directly affected by the project.
The Contractor shall be responsible for distribution of said letter in handout form to all the appropriate
residences and buildings in the subject area. Distribution shall be accomplished in a manner
acceptable to the City Engineer and shall be five (5) working days prior to the beginning of construction
operations in the immediate vicinity. In addition to the above, the Contractor shall be fully responsible
for such other notifications as may be required related to necessary closures of streets, alleys,
driveways, etc., or to unavoidable access or parking restrictions. These notifications shall apply where
the closures and access or parking restrictions required in the performance of any work under this
contract preclude any resident, tenant, or property owner from utilizing the premises or conducting
business thereon in a reasonable and customary manner.
Additional notification to the affected businesses and residents shall be prepared by the City and
distributed by the Contractor for roadway and driveway closures five (5) working days in advance of
any construction work. No removal or excavation work is allowed until the additional notification has
been distributed to the affected residents and businesses.
If a Contractor is unable to adhere to his schedule as indicated on his written notification, then all the
affected residents and places of business shall be re-notified of the revised schedule, in writing, as
indicated above.
Contractor costs for all of the above notifications shall be considered as included in the appropriate
items of the Bid Proposal.
E.Notification of Utilities – The provisions of Section 402 entitled "Utilities" of the “Greenbook” Standard
Specifications shall apply. The Contractor shall contact the Underground Service Alert of Southern
California (U.S.A.) at least two working days in advance of the construction work.
2.07
2.08
INDEPENDENT CONTRACTOR
The Contractor in the performance of the Work hereunder will be acting in an independent capacity and not
as an agent, employee, partner, or joint venture of the City.
EMERGENCY WORK
A.During Working Hours:
In case of an emergency which threatens loss or injury of property, and/or safety of life during working
hours, the Contractor shall act, without previous instructions from the City, as the situation may warrant.
He/she shall notify the Director of the emergency and the action taken immediately thereafter.
Any compensation claimed by the Contractor, together with substantiating documents in regard to
Page 16 of 120
.
.
Item 8 Page 18 of 221
expense, shall be submitted to the Director within 15 calendar days after the emergency.
Compensation, if allowed, will be paid for as Extra Work.
B.Outside of Working Hours:
Whenever, in the opinion of the City, there shall arise outside of the regular Working hours on the
Contract Work of an emergency nature which threatens loss or injury of property, or danger to public
safety, the Contractor shall act, without previous instructions from the City as the situation may
warrant. He/she shall notify the Director of the emergency and the action taken immediately
thereafter. Any compensation claimed by the Contractor, together with substantiating documents in
regard to expense, shall be submitted to the Director within 15 calendar days after the emergency.
Compensation, if allowed, will be paid for as Extra Work. In the event the Contractor is not able to
respond to an emergency outside of regular working hours, the City's forces will handle such
emergency Work. If such emergency arises out of or is the result of operations by the Contractor, the
cost of the corrective measures will be billed to the Contractor and deducted from his/her payment as
provided in the Contract Documents. The performance of emergency Work by City forces will not
relieve the Contractor of any of his/her responsibilities, obligations, or liabilities under the Contract.
2.09 SUBCONTRACTORS
A.Each subcontract shall contain a reference to the Contract between the City and the principal
Contractor, and the terms of the Contract and all parts thereof shall be made part of each subcontract
insofar as applicable to the Work covered thereby. If, in the Director’s opinion, the Subcontractor fails
to comply with the requirements of the principal Contract insofar as the same may be applicable to the
Subcontractor’s Work, the Director may disqualify the Subcontractor.
B.
C.
Nothing contained in these Contract Documents shall be construed as creating any contractual
relationship between any Subcontractor and the City.
The Contractor shall be considered the employer of the Subcontractors and shall be fully responsible
to the City for the acts and omissions of Subcontractors and of persons employed by them as the
Contractor is for the acts and omissions of persons directly employed by him/her.
D.The Contractor shall be responsible for the coordination of the trades, Subcontractors, and material
suppliers engaged upon the Work. It shall be the Contractor’s duty to see that all of his/her
Subcontractors commence their Work at the proper time and carry it on with due diligence so that
they do not delay or injure either the Work or materials; and that all damage caused by them or their
workers is made good at his/her expense.
E.
F.
The City will not undertake to settle differences between the Contractor and his/her Subcontractors or
between subcontractors.
The Contractor shall utilize the services of specialty Subcontractors, without additional expense to the
City, on those parts of the Work which are specified to be performed by specialty contractors.
2.10 USE OF FACILITIES PRIOR TO COMPLETION OF CONTRACT
A.Whenever in the opinion of the Director any Work under the Contract, or any portion(s) thereof, is in a
condition suitable for use by the City, the City may, after written notice and designation from the
Director to the Contractor, use (which includes, but is not limited to, taking over or placing into
Page 17 of 120
.
.
Item 8 Page 19 of 221
service) any portion(s) designated by the Director.
B.
C.
D.
The use of any portion(s) by the City shall not be construed as, and will not constitute acceptance in
any sense, of any portion(s) of the Work of the Contractor nor will such use trigger the running of any
warranty and/or guarantee periods.
All necessary repairs, renewals, changes, or modifications in the Work or any portion thereof so used,
not due to ordinary wear and tear, but due to defective materials or workmanship, the operations of
the Contractor, or any other cause, shall be made at the expense of the Contractor.
The use of any portion(s) by the City shall not relieve the Contractor of any of his/her responsibilities
or liabilities under the Contract nor constitute a waiver by the City of any of the conditions thereof.
Said use shall not cancel liquidated damages as of the first date of use, or any continuance thereof,
nor impair, reduce, or change the amount of liquidated damages.
2.11 COOPERATION WITH OTHER WORK FORCES
A.The City reserves the right to perform other Work at or near the site at any time by the use of its own
forces or other contractors.
B.Other contractors, other utilities and public agencies or their contractors, other City contractors, and
City personnel may be working in the vicinity during the project construction period. There may be
some interference between these activities and the Work under the Contract Documents. The
Contractor shall cooperate and coordinate his/her Work with that of other Work forces to assure
timely Contract completion.
2.12
2.13
AGREEMENTS WITH PROPERTY OWNERS
Agreements with property owners for storing excavated material, storing any other materials, or for any other
purpose related to the Work shall be made in writing and a copy submitted to the Director for his/her
information. All storage charges shall be at the Contractor’s sole expense.
PROTECTION OF PROPERTY
All public and private property, pavement or improvement, shall be safely guarded from damage or loss in
connection with this Contract by the Contractor at all times. Should any facility, structure, or property be damaged
during operations of the Contractor, he/she shall immediately notify the property owners or authorities. All
damages and losses incurred shall be paid by the Contractor.
2.14 CONTRACTOR'S RESPONSIBILITIES FOR LOSSES OR LIABILITIES
A.Risk of Loss
Except as otherwise provided in the Contract Documents and except as to the cost of repair or
restoration of damage to the Work caused by force majeure, the Contractor shall bear all losses
resulting to him/her on account of the amount or character of the Work, or from any unforeseen
obstructions or difficulties which may be encountered, or from any encumbrances on the line of the
Work, or because the nature of the ground in or on which the Work is done is different from what is
assumed. The Contractor shall bear the risk for any City equipment, material, or supplies with which
he/she has been entrusted.
Page 18 of 120
.
.
Item 8 Page 20 of 221
B.Materials and Facilities
The Contractor shall be responsible for materials and facilities as hereinafter provided and in the
event of his/her failure to carry out said responsibilities, the same may be carried out by the City at the
expense of the Contractor:
1.
2.
3.
The Contractor shall be responsible for any materials so furnished and for the care of all
Work until its completion and final acceptance, and he/she shall at his/her own expense
replace damaged or lost materials and repair damaged parts of the Work.
The Contractor shall protect City facilities from damage resulting from his/her Work. City
facilities damaged by, or as a result of, the Contractor's Work under this Contract shall be
repaired or replaced, as directed by the Director, at the Contractor's expense.
The Contractor shall remove from the vicinity of the completed Work all buildings, rubbish,
unused material, concrete forms, and other materials belonging or used under his/her
direction during construction. If Contractor fails to completely remove such items within a
reasonable time the City may do so at the Contractor’s expense.
C.Laws and Regulations
1. The Contractor shall obey all laws, ordinances, and regulations in any manner affecting those
engaged or employed on the Work, or the materials used in the Work, or in any way affecting
the conduct of the Work, and of all court orders and decrees having any jurisdiction or authority
over the same. If any discrepancy or inconsistency should be discovered in this Contract, or in
the Drawings or Specifications herein referred to, in relation to any such law, ordinance,
regulation, order, or decree, he/she shall immediately report the same in writing to the Director.
2. Contractor shall, at all times, cause all his/her agents and employees to observe and comply with
all such applicable laws, ordinances, regulations, orders, and decrees in effect or which may
become effective before Final Completion of this Contract.
3. Nothing in the Contract Documents shall be construed to permit Work not conforming to such laws,
ordinances, and regulations. If the Contractor ascertains at any time that any requirement of this
Contract is at variance with such applicable law requirement, he/she shall immediately notify the
Director.
4. If such applicable law requirement was not in effect on the date of submission of bids, any
necessary adjustment of the Contract price shall be made as provided in Article 6 herein. If such
applicable law requirement was in effect on said date of bid submission, no adjustment of Contract
price will be considered.
5. The Contractor, at his/her own expense, shall pay all taxes properly assessed against his/her
equipment, materials, or property used or required in connection with the Work.
2.15 WARRANTY AND CORRECTIONS
A.Warranty
1.Warranty. The Contractor warrants to the City that: (i) materials and equipment furnished
under the Contract will be of good quality and new unless otherwise required or permitted by
Page 19 of 120
.
.
Item 8 Page 21 of 221
the Contract Documents; (ii) the Work will be of good quality and free from defects; (iii) the
Work will conform to the requirements of the Contract Documents; and (iv) Contractor will
deliver the Project free of stop notice claims. Work not conforming to these requirements,
including substitutions not accepted by the City, will be deemed defective. The Contractor’s
warranty excludes improper or insufficient maintenance, improper operation, or normal wear
and tear and normal usage. If required by the City, the Contractor shall furnish satisfactory
evidence as to the kind and quality of materials and equipment. This warranty is not limited
by the correction obligation of Paragraph 2.04 herein.
2.
3.
Overlap. Where any warranties provided under the Contract Documents overlap, conflict, or
are duplicative, Contractor will be bound by the more stringent requirements.
Procurement and Assignment of Warranties: Contractor shall obtain in the name of City, or
transfer or assign to City or City’s designee prior to the time of Final Completion of the Work,
any and all warranties or guarantees which Contractor is required to obtain pursuant to the
contract Documents and which Contractor obtained from any other person or entity other than
Contractor including, but not limited to, Subcontractors and manufacturers, and further agrees
to perform the Work in such a manner so as to preserve any and all such warranties.
Contractor shall secure written warranties from all Subcontractors. Contractor and its
Subcontractors shall offer any warranty upgrades or extensions that are offered by
manufacturers of any equipment or system installed in the Work to the City. Contractor shall
deliver to City all warranty and guarantee documents and policies.
4.Survival of Warranties: The provisions of this paragraph 2.15 will survive Contractor’s
completion of the Work or termination of Contractor’s performance of the Work.
B.Correction of Work
1.Before or After Final Completion. The Contractor shall promptly correct Work rejected by
the City or City’s designee, as failing to conform to the requirements of the Contract
Documents, whether discovered before or after Final Completion and whether or not
fabricated, installed, or completed. Costs of correcting such rejected Work, including
additional testing, inspections, and compensation for the City’s services and expenses
made necessary thereby, will be at the Contractor’s expense within the Contract Price.
2.After Final Completion.
(a)In addition to the Contractor’s warranty obligations under Paragraph 2.15-A, if,
within one (1) year after the date of Final Completion of the Work or within the time
period established by any applicable special warranty required by the Contract
Documents, any of the Work is found to be not in accordance with the
requirements of the Contract Documents, the Contractor shall commence
correction or replacement of such Work within forty-eight (48) hours after receipt
of written notice from the City to do so. The Contractor shall perform such
corrective work without charge or cost to the City after Final Completion of the
Work. The City shall give such notice promptly after discovery of the condition.
(b)If the Contractor fails to commence correction or replacement of non-conforming
Work within forty-eight (48) hours after receipt of written notice, the City will
proceed to have defects repaired or replaced at the expense of the Contractor and
its Performance Bond surety, plus fifteen percent (15%) for the City’s overhead
Page 20 of 120
.
.
Item 8 Page 22 of 221
and administrative expense. The City may charge such costs against any
payment due Contractor. If, in the opinion of the City, defective work creates a
dangerous or hazardous condition or requires immediate correction or attention to
prevent further loss to the City or to prevent interruption of operations of the City,
the City may take immediate action, give notice, make such correction, or provide
such attention and the cost of such correction or attention will be charged against
the Contractor. Such action by the City will not relieve the Contractor of the
warranties provided in this Article or elsewhere in the Contract Documents.
3.Replacement or Removal of Defective or Unauthorized Work. The Contractor shall remove
from the Site and replace those portions of the Work which are not in accordance with the
requirements of the Contract Documents in a manner acceptable to and as ordered by the
Director. No compensation shall be allowed for such removal or replacement. Director
shall have authority to cause defective work to be remedied, removed or replaced and to
deduct the costs from monies due or to become due to the Contractor.
4.
5.
Destruction or Damage. In the event the Contractor destroys or damages any construction
of the City or another contractor while correcting or removing Work which is not in
accordance with the requirements of these Contract Documents, the Contractor shall bear
the cost of repairing or reconstructing that other construction as well.
No Limitation. Nothing contained in Paragraph 2.15-B will be construed to establish a
period of limitation with respect to other obligations which the Contractor might have under
the Contract Documents. Establishment of the one-year period for correction of Work as
described in Paragraph 2.15-B relates only to the specific obligation of the Contractor to
correct the Work, and has no relationship to the limitations periods established by statute
for any construction defect or other causes of action.
2.16 CLEANING AND ENVIRONMENTAL CONTROLS
The Contractor, Subcontractors and employees shall comply with all litter and pollution laws and it shall be the
responsibility of the Contractor to ensure compliance. The Contractor shall do all of the following:
A.Maintain the Site free of waste materials, debris, and rubbish and in a clean and orderly condition;
and Remove waste materials, debris and rubbish from site and dispose off-site legally.
B.The Contractor shall maintain at his/her disposal any and all equipment necessary to prevent and
remediate any sanitary sewer overflow arising out of the Work. The Contractor shall furnish and operate
a self-loading motor sweeper with spray nozzles, as directed by the Director, to maintain the affected
areas in a condition of cleanliness acceptable to the City at all locations affected by the Contractor’s
operations. For purposes of this Paragraph, the affected areas include the project Site as well as all
haul routes to and from the project Site and all areas of construction and restoration which have not
been completed.
C.
D.
The Contractor shall take appropriate action to ensure that no dust originates from the project Site.
Any equipment or vehicles driven and/or operated within or adjacent to a street gutter, storm drain,
runoff conveyance or ocean shall be checked and maintained daily to prevent leaks of materials that
if introduced to water could be deleterious to aquatic life.
E.No debris, soil, silt, sand, bark, trash, sawdust, rubbish, cement or concrete or washings thereof, oil or
Page 21 of 120
.
.
Item 8 Page 23 of 221
petroleum products or other organic or earthen material from any construction, or associated activity or
whatever nature shall be allowed to enter into or placed where same may be washed by rainfall or
runoff into waters of the State. When operations are completed, any excess materials or debris shall
be removed from the Work area.
2.17 WATER POLLUTION CONTROL
A.The Contractor shall meet all applicable City of Vernon, state and federal clean water laws, rules and
regulations including but not limited to all conditions set forth in the Vernon Municipal Code Chapter
21, Article 5 regarding stormwater and urban runoff controls as it relates to public agency activities
including, but not limited to storm and/or sanitary sewer system inspection and repair, street
sweeping, trash pick-up and disposal, and street and right-of-way construction and repair are
required to implement and maintain the activity specific Best Management Practices (BMPs) listed
in Table 2-1 below in compliance with the National Pollutant Discharge Elimination System (NPDES)
requirements. Contractor shall not discharge any water containing trash, debris, pollutants, fuels,
oils, soaps or other non-allowable constituents from its sweeping vehicles upon any city street, to
any storm drain or any non-permitted outlet. As part of its submission, contractor shall describe its
methods for preventing NPDES violations during sweeping operations within the City. In addition,
Contractor shall comply with all NPDES requirements at its maintenance facilities, storage yards and
company facilities. Failure to comply with this section may result in termination for cause by the City
of any contract resulting from this solicitation.
Table 2-1. BMPs for Public Agency Facilities and Activities
General and Activity Specific BMPs
Scheduling and Planning
Spill Prevention and Control
Sanitary/SepticWasteManagement
Material Use
General BMPs Safer Alternative Products
Vehicle/Equipment Cleaning, Fueling and Maintenance
Illicit Connection Detection, Reporting and Removal
Illegal Spill Discharge Control
Maintenance Facility Housekeeping Practices
Asphalt Cement Crack and Joint Grinding/ Sealing
Asphalt Paving
Structural Pavement Failure (Digouts) Pavement Grinding and PavingFlexiblePavement
Emergency Pothole Repairs
SealingOperations
Portland Cement Crack and Joint Sealing
Mudjacking and DrillingRigid Pavement
Concrete Slab and Spall Repair
ShoulderGrading
Nonlandscaped Chemical Vegetation Control
Nonlandscaped Mechanical Vegetation Control/Mowing
Nonlandscaped Tree and Shrub Pruning, Brush Chipping, Tree and Shrub
Removal
Slope/Drains/Vegetation
Page 22 of 120
.
.
Item 8 Page 24 of 221
Fence Repair
Drainage Ditch and Channel Maintenance
Drain and Culvert Maintenance
Curb and Sidewalk Repair
SweepingOperations
Litter and Debris RemovalLitter/ Debris/ Graffiti
Landscaping
Emergency Response and Cleanup Practices
Graffiti Removal
ChemicalVegetation Control
Manual Vegetation Control
Landscaped Mechanical Vegetation Control/ Mowing
Landscaped Tree and Shrub Pruning, Brush Chipping, Tree and Shrub Removal
Irrigation Line Repairs
Irrigation (Watering), Potable and Nonpotable
Storm Drain Stenciling
Roadside Slope Inspection
Environmental
Bridges
RoadsideStabilization
StormwaterTreatment Devices
Traction Sand Trap Devices
Welding and Grinding
Sandblasting, Wet Blast with Sand Injection and Hydroblasting
Painting
Bridge Repairs
Pump Station Cleaning
Tube and Tunnel Maintenance and Repair
Tow Truck OperationsOtherStructures
Electrical
Toll Booth Lane Scrubbing Operations
Sawcutting for Loop Installation
Thermoplastic Striping and Marking
Paint Striping and Marking
Raised/ Recessed Pavement Marker Application and Removal
Sign Repair and MaintenanceTrafficGuidance
Median Barrier and Guard Rail Repair
Emergency Vehicle Energy Attenuation Repair
Minor Slides and Slipouts Cleanup/ Repair
Building and Grounds Maintenance
Storage of Hazardous Materials (Working Stock)
Material Storage Control (Hazardous Waste)
Outdoor Storage of Raw Materials
Vehicle and Equipment Fueling
StormMaintenance
Management and Support
Vehicle and Equipment Cleaning
Vehicle and Equipment Maintenance and Repair
Aboveground and Underground Tank Leak and Spill Control
Page 23 of 120
.
.
Item 8 Page 25 of 221
B.Water Quality Protection Requirements for Construction Projects with Less than One (1) Acre of
Disturbed Soil.
All construction projects, regardless of size, will be required to implement best management practices
(BMPs) necessary to reduce pollutants to the Maximum Extent Practicable (MEP) to meet the
minimum water quality protection requirements and implement all applicable set of BMPs as defined
in Table 2-2.
Table 2-2
Minimum Water Quality Protection Requirements and Applicable Set of BMPs for All Construction Projects
Category Minimum Requirements BMPs
1. Sediment Control Sediments generated on the project site shall be retained
using adequate Treatment Control or Structural BMPs.
Sediment Control
2. Non-Stormwater
Management, Waste
Management and
Materials Pollution
Control
Construction-related materials, wastes, spills or residues
shall be retained at the project site to avoid discharge to
streets, drainage facilities, receiving waters, or adjacent
properties by wind or runoff.
Non-storm water runoff from equipment and vehicle washing
and any other activity shall be contained at the project sites.
Stormwater
Management; Waste
Management
3. Erosion Control Erosion from slopes and channels shall be controlled by
implementing an effective combination of BMPs, such as the
limiting of grading scheduled during the wet season;
inspecting graded areas during rain events; planting and
maintenance of vegetation on slopes; and covering erosion
susceptible slopes.
Erosion Control
Please refer to the California Stormwater Quality Association’s Construction Handbook (available on their website:
www.cabmphandbooks.com) for further information regarding the BMPs listed in Table 2-2.
All construction projects with Less than One (1) Acre of Disturbed Soil shall submit to the City a
signed Statement of Intent to Comply with Minimum Requirements of the Stormwater Permit
(Exhibit 5).
The Contractor may self-certify that the following training was completed on an annual basis
providing they certify they have received all applicable training:
The Contractor shall train all of their employees in targeted positions (whose interactions,
jobs, and activities affect stormwater quality) on the requirements of the overall stormwater
management program.
When the Work includes the use or have the potential to use pesticides or fertilizers, the
Contractor shall train all of their employees (whether or not they normally apply pesticides
or fertilizers as part of their work). Training programs shall address:
1) The potential for pesticide-related surface water toxicity;
2) Proper use, handling, and disposal of pesticides;
Page 24 of 120
.
.
Item 8 Page 26 of 221
3) Least toxic methods of pest prevention and control, including Integrated Pest
Management; and
4) Reduction of pesticide use
C.Water Quality Protection Requirements for Construction Projects with One (1) Acre (or greater) of
Disturbed Soil. In addition to the minimum BMPs required in Paragraphs A and B, all construction
projects where at least one (1) acre of soil will be disturbed, construction activity that results in land
surface disturbances of less than one acre if the activity is part of a larger common plan of development,
or the sale of one or more acres of disturbed land surface requires a Construction Activities Storm
Water General Permit (2009-0009-DWQ Permit).
Prior to commencement of construction activities, the Permit Registration Documents (PRDs) must
be submitted electronically in the Storm Water Multi-Application Report Tracking System (SMARTS)
(http://smarts.waterboards.ca.gov/smarts/faces/SwSmartsLogin.jsp). PRDs consist of the
Notice of Intent, Risk Assessment, Post-Construction Calculations, a Site Map, the Storm Water
Pollution Prevention Plan (SWPPP), a signed certification statement by the Legally Responsible
Person (LRP), and the first annual fee.
See: http://www.swrcb.ca.gov/water_issues/programs/stormwater/construction.shtml for more
information. A Waste Discharger Identification (WDID) will be emailed to the LRP after the PRDs
have been submitted and are deemed complete. Construction activities cannot begin until a WDID is
issued by the State Water Resources Control Board. Contractor shall bear the costs of any delays to
the Project caused by a delay in obtaining its WDID.
The SWPPP shall include:
1. The name, location, period of construction, and a brief description of the project;
2. Contact information for the owner and contractor;
3. The building permit number for the project;
4. The grading permit number for the project (where applicable);
5. A list of major construction materials, wastes, and activities at the project site;
6. A list of best management practices to be used to control pollutant discharges from major
construction materials, wastes, and activities;
7. A site plan (construction plans may be used) indicating the selection of BMPs and their
location where appropriate;
8. Non-storm water discharges, their locations, and the BMPs necessary to prevent the
discharge;
9. A maintenance and self-inspection schedule of the BMPs to determine the effectiveness
and necessary repairs of the BMPs; and
10. A certification statement that all required and selected BMPs will be effectively
implemented.
Within seven (7) days after the City awards the Contract, the Contractor shall submit one (1) original
hard copy and one (1) electronic copy via email to lmelendez@cityofvernon.org of the proposed
SWPPP to the City. The City shall review the SWPPP within 14 days of receipt of the plan. If revisions
are required, the Contractor shall revise and re-submit the document within seven (7) days of its receipt
of the City’s comments. The City shall then have seven (7) days to consider the revisions made by the
Contractor and approve the SWPPP.
The Contractor shall maintain a minimum of two (2) readily accessible copies of the SWPPP at the
Project site. The SWPPP shall be made available upon request of a representative of the Los
Page 25 of 120
.
.
Item 8 Page 27 of 221
Angeles Regional Water Quality Control Board (LARWQCB) or the U.S. Environmental Protection
Agency (U.S. EPA). Requests by environmental groups and the public shall be directed to the
City.
D.Best Management Practices
The objective of the SWPPP is to identify potential sources of pollution that may reasonably affect
the quality of storm water discharge associated with construction activities. The plan will describe
and ensure the implementation of Best Management Practices (BMPs) which will be used to
reduce pollutants in the storm water discharges from the construction site. A Best Management
Practice is defined as any program, technology, process, operating method, measure, or device
that controls, prevents, removes, or reduces pollution. The Contractor shall select appropriate
BMPs from the California Stormwater BMP Handbook, Municipal, Industrial, New Development,
and Construction Volumes (www.cabmphandbooks.com) in conjunction with all activities and
construction operations. Copies of the California Stormwater BMP Handbooks may be obtained
from:
California Stormwater Quality Association
P.O. Box 2313
Livermore, CA 94551
Cashier
Los Angeles County DPW
900 South Fremont Avenue
Alhambra, CA 91803
Tel. No. (626) 458-6959
www.cabmphandbooks.com
E.Implementation
The Contractor will be responsible throughout the duration of the Project for the installation,
monitoring, inspection and maintenance of the BMPs included in the SWPPP and for removing and
disposing of temporary BMPs. The Contractor may be required to implement additional BMPs as a
result of changes in actual field conditions, contractor’s activities, or construction operations.
The Contractor shall demonstrate the ability and preparedness to fully deploy these SWPPP
control measures to protect soil-disturbed areas of the project site before the onset of precipitation
and shall maintain a detailed plan for the mobilization of sufficient labor and equipment to fully
deploy these control measures.
Throughout the winter season, active soil-disturbed areas of the project site shall be fully protected
at the end of each day with these control measures unless fair weather is predicted through the
following day. The Contractor shall monitor daily weather forecasts. If precipitation is predicted
prior to the end of the following workday, construction scheduling shall be modified, as required,
and the Contractor shall deploy functioning control measures prior to the onset of the precipitation.
The City may order the suspension of construction operations which are creating water pollution if
the Contractor fails to conform to the requirements of this Paragraph 2.17. Unless otherwise directed
by the City, the Contractor’s responsibility for SWPPP implementation shall continue throughout any
temporary suspension of the Work.
F.Sewage Spill Prevention. The Contractor’s attention is directed to the sewer bypass operation
required during any sewer construction pursuant to the 2021 edition of the “Greenbook” Standard
Specifications for Public Works Construction, Section 3-12.5 or as that section is subsequently
amended.
The Contractor shall exercise extraordinary care to prevent the cause of events that may lead to a
sewage spill. In the event of a sewage spill, the Contractor shall make arrangements for an
Page 26 of 120
.
.
Item 8 Page 28 of 221
emergency response unit comprised of emergency response equipment and trained personnel to
be immediately dispatched to the project site.
The Contractor shall be fully responsible for preventing and containing sewage spills as well as
recovering and properly disposing of raw sewage. In addition, the Contractor is responsible for any
fines, penalties and liabilities arising from negligently causing a sewage spill. Any utility that is
damaged by the contractor shall be immediately repaired at the Contractor’s expense. The
Contractor shall take all measures necessary to prevent further damage or service interruption and
to contain and clean up the sewage spills.
G.Sewage Spill Telephone Notification
Should a sewage spill occur, the Contractor shall immediately report the incident to both of these two
City Departments:
Sewer Maintenance Services...............City of Vernon Control Center (323) 826-1461
Fire Department Dispatch Center................................................................................. 911
The Contractor is encouraged to obtain telephone numbers, pager numbers and cellular telephone
numbers of City representatives such as Project Managers and Inspectors. However, if these City
representatives are not available, then the Contractor shall immediately call:
City of Vernon Control Center (323) 826-1461
H.Sewage Spill Written Notification
The Contractor shall prepare and submit a written report to the Director within three (3) Working
Days from the occurrence of a spill to the City. This report shall describe all of the following:
1. The exact location on the Thomas Guide map.
2. The nature and volume.
3. The date, time and duration.
4. The cause.
5. The type of remedial and/or cleanup measures taken and date and time
implemented.
6. The corrective and preventive action taken.
7. The water body impacted and results of necessary monitoring.
I.Enforcement
The City is subject to enforcement actions by the LARWQCB, U.S. EPA, environmental groups and
private citizens. The Contractor shall indemnify, defend and hold City, its officers, agents and
employees harmless from Contractor’s failure to comply and/or fulfill the requirements set forth in
this Paragraph 2.17. Contractor shall be responsible for all costs and liabilities imposed by law as
result of Contractor’s failure to comply and/or fulfill the requirements set forth in this Paragraph 2.17.
The costs and liabilities include, but are not limited to fines, penalties and damages whether
assessed against the City or the Contractor.
Page 27 of 120
.
.
Item 8 Page 29 of 221
In addition to any remedy authorized by law, any money due to the Contractor under this contract
shall be retained by the City until all costs and liabilities imposed by law against the City or Contractor
have been satisfied.
J.Maintenance
The Contractor shall ensure the proper implementation and functioning of BMP control measures
and shall regularly inspect and maintain the construction site for the BMPs identified in the
SWPPP. The Contractor shall identify corrective actions and time frames in order to properly
address any damaged measure, or reinitiate any BMPs that have been discontinued.
If the City identifies a deficiency in the deployment or functioning of identified control measures, the
deficiency shall be corrected by the Contractor immediately or by a later date and time if agreed to
by Director and if requested in writing, but not later than the onset of the subsequent precipitation
events. The correction of deficiencies shall be at no additional cost to the City.
K.Payment
All costs involved in the implementation of the SWPPP, including furnishing all labor, materials,
tools, equipment and all incidentals; and for doing all the work involved in installing, constructing,
maintaining, removing, and disposing of control measures, except those that were installed as a
part of another structure, shall be included in the unit prices bid for the various related items of
work and no additional compensation will be made therefor.
2.18 SOLID WASTE DISPOSAL AND DIVERSION
The Contractor shall submit to the Director the following summary of solid waste generated by the Work,
disposed in Class III landfills, or diverted from disposal through recycling. Report disposal in inert fill
separately. This form must be accompanied by legible copies of weight tickets, receipts, or invoices that
specifically identify the project generating the material. Said documents must be from recyclers and/or
disposal site operators that are acceptable to the Director. Further, the documents must be submitted to the
Director with each application for progress payment. Failure to submit the form and its supporting
documentation will render the application for progress payment incomplete and delay progress payments.
Page 28 of 120
.
.
Item 8 Page 30 of 221
.
.
Item 8 Page 31 of 221
.
.
Item 8 Page 32 of 221
ARTICLE 3 - TIME OF COMMENCEMENT AND COMPLETION
3.01 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
A.Notice to Proceed
The Contractor is not authorized to perform any Work the Contract Documents until he/she has
received from the City an official notification to commence Work. The date on which the notification is
received by the Contractor is herein referred to as the Notice to Proceed. The Contractor shall
commence Work on the Date of Commencement established in the Notice to Proceed is issued. The
Notice to Proceed shall be issued after the Contract is properly executed, bonds are furnished and
approved, and insurance has been submitted and approved.
B.
C.
Prosecution of the Work
Work shall be continued at all times with such force and equipment as will be sufficient to complete it
within the specified time. The Contractor expressly proposes that he/she has taken into consideration
and made allowances for all ordinary delays and hindrances to the Work to be performed and that
he/she will complete the Work within the specified time.
Required Contract Completion
Time is of the essence in the completion of this Contract. The Work shall be completed in its entirety
and made ready for service within one thousand ninety-five (1,095) calendar days following the Date
of Commencement established in the Notice to Proceed (“Contract Time”). By executing the Contract,
Contractor confirms that the Contract Time is a reasonable period for performing the Work.
3.02
3.03
CITY'S DISCRETION TO EXTEND CONTRACT TIME
In the event the Work required hereunder is not satisfactorily completed in all parts and in compliance with the
Contract Documents, City shall have the right, in its sole discretion, to increase the number of Working Days or
not, as may seem best to serve the interest of City. A change order extending the Contract Time only will be
issued by the City should the City decide to increase the number of Working Days.
SUBSTANTIAL COMPLETION
A.Contractor Request for Inspection and Punch List
When the Contractor considers that it has achieved Substantial Completion of the Work, or
designated portion thereof, Contractor shall prepare and submit to the Director a request for
inspection and a comprehensive punch list of items to be completed or corrected prior to Final
Payment. Failure to include an item on such punch list does not alter the responsibility of the
Contractor to complete all Work in accordance with the Contract Documents.
B.City Inspection
Upon receipt of the Contractor's punch list, the Director will make an inspection to determine
whether the Work or designated portion thereof is Substantially Complete. If the inspection
discloses any item, whether or not included on the Contractor's punch list, which is not sufficiently
complete in accordance with the Contract Documents so that the City can occupy or utilize the
Work or designated portion thereof for its intended use, the Contractor shall, before City's issuance
of the Certificate of Substantial Completion, complete or correct such item upon notification by City.
Page 30 of 120
.
.
Item 8 Page 33 of 221
The Contractor shall then submit a request for another inspection by City to determine Substantial
Completion.
C.Certificate of Substantial Completion
When the Work or designated portion thereof is substantially complete, the Director will prepare a
Certificate of Substantial Completion which shall establish the date of Substantial Completion, shall
establish responsibilities of the City and Contractor for security, maintenance, utilities, damage to the
Work, and insurance, and shall fix the time within which the Contractor shall finish all items on the
Contractor’s punch list accompanying the Certificate. Warranties required by the Contract
Documents shall commence on the date of Substantial Completion of the Work. Contractor shall
deliver to City all warranty and guarantee documents and policies.
3.04 DELAYS AND EXTENSIONS OF TIME FOR CONTRACTOR
A.
B.
C.
The Contractor shall take reasonable precautions to foresee and prevent delays to the Work. In the
event of any delay to the Work, the Contractor shall revise his/her sequence of operations, to the
extent possible under the terms of the Contract, to offset the delay.
If any delay to the Work is caused by circumstances within the Contractor's control, it is not excusable
and not compensable, and the Contractor will not be entitled to any extension of time or to any other
compensation for damages resulting directly or indirectly therefrom.
If any delay having a direct effect on the Work is caused by circumstances beyond the control of the
Contractor except for causes of delay specified in Paragraph 3.04-D., such delay may be excusable
and may entitle the Contractor to an equivalent extension of time, but not to any other compensation.
Excusable but not compensable causes include but are not limited to labor disputes, weather
conditions unfavorable for prosecution of the Work, and force majeure.
D.If any delay having a direct effect on the Work is caused by failure of the City to provide information
as specified, or necessary instructions for carrying on the Work, or to provide the necessary right of
way or site for installation, or failure of a utility to remove or relocate an existing facility such delay
may be compensable and may entitle the Contractor to an equivalent extension of time, and to
compensation for damages resulting directly from any of the causes of delay specified in this
paragraph.
E.
F.
The Contractor shall notify the Director in writing of any delay having a direct effect on the Work and
the causes thereof within 15 days from the beginning of such delay.
Any claim for an extension of time or for compensation for damages resulting from delay shall be
made in writing to the Director not more than 30 days after the ending of such delay. The Contractor
shall provide a written report evaluating the impact of the delay which shall include, at a minimum,
all of the following:
1. a narrative description of the delay and its impact on the critical path to Substantial Completion of
the Work or a portion of the Work designated by City;
2. a detailed breakdown of the Allowable Costs, if any, sought by Contractor due to the delay;
3. the number of days of extension sought by Contractor as an adjustment to the Contract time;
4. a statement that Contractor has complied with the requirements of the General Conditions for
written notice of delays, along with the dates and copies of such notices;
5. the measures taken by Contractor and Subcontractors to prevent or minimize the delay; and
Page 31 of 120
.
.
Item 8 Page 34 of 221
6. the Contactor’s recommendations for reordering or re-sequencing the Work to avoid or minimize
further delay.
No extension of time or compensation for damages resulting from delay will be granted unless the
delay affects the timely completion of the overall Work under the Contract or the timely completion
of a portion of the Work for which a time of completion is specified.
G.
H.
The Director will investigate the facts and ascertain the extent of the delay, and his/her findings
thereon shall be final and conclusive.
Failure of the Contractor to give written notice of a delay, or to submit or document a claim for an
extension of time or for damages resulting from delay in the manner and within the times stated
above shall constitute a waiver of all claims thereto.
I.When a Contractor experiences two concurrent delays, one compensable and the other excusable,
no compensation other than an extension of time will be allowed.
J.An extension of time must be approved by the Director to be effective, but an extension of time
whether with or without consent of the sureties, shall not release the sureties from their obligations,
which shall remain in full force until the discharge of the Contract.
3.05 CLIMATIC CONDITIONS
A.
B.
C.
The Director may suspend the Work whenever weather conditions or conditions resulting from
inclement weather are unfavorable for the prosecution of the Work. The delay caused by such
suspension may entitle the Contractor to an extension of time but not to any other compensation.
If the Contractor believes that Work should be suspended under this Paragraph 3.05, he/she may
request such suspension. The delay caused by such suspension may entitle the Contractor to an
extension of time but not to any other compensation.
No extension of time will be granted for suspension of Work unless the suspension affects the timely
completion of all Work under the Contract or the timely completion of a portion of the Work for which
a time of completion is specified. Determination that the suspension for inclement weather conditions
or conditions resulting from inclement weather affects timely completion and entitles the Contractor
to an extension of time shall be made and agreed to in writing by the Director and the Contractor on
each day that Work is suspended. In the event of failure to agree, the Contractor may protest under
the provisions of Paragraph 7.07.
D.If Work is suspended and an extension of time is granted under this Paragraph 3.05 the Contractor
will be entitled to a one day extension of time for each day that he/she is unable to Work at least
one-half of his/her current normal Work day; and if the Work is suspended at the regular starting time
on any Work day and the Contractor's Workforce is dismissed as a result thereof, then he/she will
be entitled to a one day extension of time whether or not conditions change thereafter and the major
portion of the day is suitable for Work.
3.06 COMPLETION AND ACCEPTANCE
A.Upon request by the Contractor, the Director shall conduct a final inspection of the Work. If, in the
Director’s opinion, Final Completion has been achieved, the Director will accept the Work by issuing a
“Notice of Completion” of the Work to the Contractor. Upon the issuance of the Notice of Completion
the Contractor will be relieved from responsibility to protect the Work.
B.Within 15 calendar days after issuing the Notice of Completion, the Director will record the Notice of
Page 32 of 120
.
.
Item 8 Page 35 of 221
Completion with the County Recorder.
LIQUIDATED DAMAGES3.07
A.Contractor and City agree to liquidate damages in the amount of five hundred dollars ($500) per day,
with respect to Contractor’s non-completion of the monthly Routine Maintenance-Inspection and
Cleaning work for each day past the first seven (7) working days for half of the intersections listed in
Attachment B and the seven (7) working days for the other half of the intersections each month. In
addition, the Contractor shall pay to the City, or have withheld from the monies due it, the sum of on-
hundred ($100) for each hour late when responding to emergency situations. The Parties intend for the
liquidated damages set forth herein to apply to this Contract as set forth in Government Code Section
53069.85. The Contractor acknowledges and agrees that the liquidated damages are intended to
compensate City solely for the Contractor’s failure to meet the deadline for Substantial Completion and
shall not excuse Contractor from liability from any other breach, including any failure of the Work to
conform to the requirements of the Contract Documents.
B.
C.
In the event that Contractor fails to achieve Substantial Completion of the Work within the Contract
Time, Contractor agrees to pay City the amount specified in the Contract form for each calendar day
that Substantial Completion is delayed.
Contractor and City acknowledge and agree that the foregoing liquidated damages have been set
based on an evaluation of damages that the City will incur in the event of late completion of the Work.
Contractor and City acknowledge and agree that the amount of such damages are impossible to
ascertain as of the effective date hereof and have agreed to such liquidated damages to fix City’s
damages and to avoid later disputes. It is understood and agreed by Contractor that liquidated
damages payable pursuant to this Agreement are not a penalty and that such amount are not manifestly
unreasonable under the circumstances existing as of the effective date of this Agreement.
D.It is further mutually agreed that City shall have the right to deduct liquidated damages against progress
payments or retainage and that the City will issue a Construction Change Directive and reduce the
Contract Sum accordingly. In the event the remaining unpaid Contract Sum is insufficient to cover the
full amount of liquidated damages. Contractor shall pay the difference to City.
[END OF ARTICLE]
Page 33 of 120
.
.
Item 8 Page 36 of 221
ARTICLE 4 - CONSTRUCTION SCHEDULES
4.01 BASELINE PROJECT SCHEDULE
The Contractor shall submit his/her work Baseline Project Schedule, in electronic as well as hard-copy format,
to the Director at the pre-construction meeting showing in detail how the Contractor plans to execute and
coordinate the Work. The construction schedule shall show the sequence of work, critical path and estimated
time for completion of each segment of work. This schedule must be reviewed and accepted by the Director
before the Contractor will be permitted to begin work. In addition, the Contractor shall submit a detailed schedule
forecasting two (2) weeks of work describing each day’s work. This schedule shall be updated and submitted to
the City every other Monday during the construction period. The Contractor shall give 48 hours notice to the City
Engineer prior to the start of the work.
A.Format
1. At a minimum, the Baseline Project Schedule activities shall be coded on a work discipline basis
and by geographic area or location on the Project. The Baseline Project Schedule shall include a
detailed description of each activity code. The Baseline Project Schedule shall be based on and
incorporate contract milestone and completion dates specified in the Contract Documents. It shall
depict events, jobs, and their interrelationships and shall recognize the progress that must be made
on one task before subsequent tasks can begin. The schedule shall be comprehensive and shall
include all logical interdependencies and interactions required to perform the Work of the Project.
2. Overall time of completion and time of completion for each milestone shown on the Schedule shall
adhere to the specified Contract Time, unless an earlier (advanced) time of completion is
requested by Contractor, agreed to by the City and formalized by Change Order.
3. Contractor shall use the latest version of Microsoft Project or equivalent software agreed to by
the parties.
4. The City will review the submitted Baseline Project Schedule for conformance with these
scheduling requirements. Within fourteen (14) calendar days after receipt, the City will accept the
proposed Baseline Project Schedule or will return it with comments. If the proposed Baseline
Project Schedule is accepted by the City, it shall be deemed part of the Contract Documents. If
the Baseline Project Schedule is not accepted by City, Contractor shall revise the Baseline Project
Schedule, in accordance with the recommendations of the City, and re-submit same for
acceptance, no later than seven (7) calendar days after receipt of said recommendation.
5. Acceptance of Baseline Project Schedule by City, failure to include an element of work, or
inaccuracy in Baseline Project Schedule shall not relieve Contractor from the responsibility for
accomplishing the Work in accordance with the Contract Documents.
B.Float
1. Critical Work activities are defined as Work activities which, if delayed or extended, will delay the
scheduled completion of the milestones and/or time of completion. All other Work activities are
defined as non-critical Work activities and are considered to have float. Float is defined as the
time that a non-critical Work activity can be delayed or extended without delaying the scheduled
completion of the milestones and/or time of completion. Float is considered a Project resource
available to either party or both parties as needed. Once identified, Contractor shall monitor,
account for, and maintain float in accordance with Critical Path Methodology.
Page 34 of 120
.
.
Item 8 Page 37 of 221
2. Delays of any non-critical Work shall not be the basis for an extension of Contract Time until the
delays consume all float associated with that non-critical Work activity and cause the Work activity
to become critical.
3. It is acknowledged that City-caused time savings (i.e., critical path submittal reviews returned in
less time than allowed by the Contract Documents, approval of substitution requests which result
in a savings of time for Contractor, etc.) create shared float. Accordingly, City-caused delays may
be offset by City-caused time savings.
C.Weather (This section applies only to projects of one (1) year duration or longer)
The completion time contemplated by this Contract anticipates zero (0) lost days (Work Days) due to
normal weather conditions annually and prorated for any duration less than twelve months. Only
unusual or extreme weather conditions, as determined by the National Oceanic and Atmospheric
Administration, for the time of year will be considered as justification for an extension of time to complete
the Project, and only after the zero (0) weather days have been utilized. Annual weather days are not
cumulative, and unused days shall become “float” for the benefit of the project, and the schedule
adjusted accordingly. The use of weather days by the Contractor shall be subject to all the conditions
of claim for an extension of time. The Contractor shall notify the City in writing within ten (10) days of
the commencement of each rain event.
D. Early Completion
While the Contractor may schedule completion of the Project earlier than the date established by the
Contract Documents, no additional compensation shall become due the Contractor for the use of float
time between the Contractor’s projected early completion date and the date for Substantial Completion
established by the Contract Documents, unless an earlier (advanced) time of completion is requested
by Contractor, agreed to by the City, and formalized by Change Order.
4.02 SCHEDULE UPDATES
A.With each Application for Payment submitted by Contractor (other than the final Application for
Payment), the Contractor shall submit to the City an updated Project Schedule revised to indicate the
Work completed, status of Work in progress, all progress slippages, corrective actions taken, or
slippage carry-over, for all anticipated delays or difficulties, and all other information required to
accurately present the actual status of the progress of the Work as of the date of the Application for
Payment. If the Contractor does not submit an updated Project Schedule with an Application for
Payment, City may withhold payment, in whole or in part, until the updated Project Schedule is
submitted. In the event that an update to the Project Schedule indicates a delay to the Contract Time
the Contractor shall propose an affirmative plan to correct each such delay, including overtime and/or
additional labor, if necessary. In no event shall any Project Schedule update constitute an adjustment
in the Contract Time, any deadline, or the Contract Sum unless any such adjustment is agreed to by
the City and authorized pursuant to Change Order or Work Directive.
B.
C.
At no time shall historical data contained within the updated Project Schedule (i.e. completed activities)
be removed and/or altered in any way. This historical data is to be preserved within each of the updated
Project Schedules and submitted with the final schedule update to reflect the actual start and finish
dates for each activity within the Schedule.
Any work stoppages within individual work activities that exceed seven (7) calendar days in duration
shall be clearly indicated within the updated Project Schedule. In cases where unplanned activity work
Page 35 of 120
.
.
Item 8 Page 38 of 221
stoppages exceed seven (7) calendar days activities shall be added to the Project Schedule to clearly
indicate the work stoppage period and identify forecasted resumption and completion of the activity
where work has stopped. Contractor shall clearly note all schedule revisions when Project Schedule
updates are submitted, as required in this Paragraph 4.02 above.
4.03 NONCOMPENSABLE EXTRAORDINARY MEASURES
A.Should the City determine, in its sole judgment, that the performance of the Work has not progressed
to the level of completion required by the Contract Documents, City shall have the right to order the
Contractor to take corrective measures to expedite the progress of construction, at no additional cost
to the City, including, without limitation, the following:
1. Working additional shifts of overtime.
2. Supplying additional manpower, equipment, and/or facilities.
3. Reschedule activities to maximize practical concurrence of accomplishment of activities.
4. Submitting a Recovery Schedule discussed above, for resequencing performance of the Work or
other similar measures.
5. Any other actions that may be necessary to mitigate delays.
B.Such Extraordinary Measures shall continue until the progress of the Work is no longer behind schedule
and/or reaches the stage of completion required by the Contract Documents. Contractor shall not be
entitled to an adjustment in the Contract Sum in connection with the performance of any such
Extraordinary Measures required by the City under this Paragraph. The City may exercise the rights
furnished the City pursuant to this Paragraph as frequently as the City deems necessary to ensure that
the Contractor’s performance of the Work will comply with the Contract Time or interim completion
dates set forth in the Contract Documents. If Contractor or its Subcontractors fail to implement or
commence Extraordinary Measures within ten (10) calendar days of City’s written demand, City may,
without prejudice to other remedies, take corrective action at the expense of the Contractor which shall
reduce the Contract Sum accordingly.
4.04 CONDITION OF PAYMENT
Compliance by Contractor with the requirements of the Contract Documents pertaining to preparation,
submission, revising and updating of the Schedule is a condition precedent to City’s obligation to make payment
to Contractor of any or all sums that might otherwise be due to Contractor in the absence of such noncompliance.
Payment by City under circumstances in which City, for any reason, fails or elects not to assert its right to withhold
payment for noncompliance with this Paragraph shall not be construed as a waiver of the right to withhold future
payments on account of such noncompliance or any other noncompliance.
[END OF ARTICLE]
Page 36 of 120
.
.
Item 8 Page 39 of 221
ARTICLE 5 - SUSPENSION OR TERMINATION OF CONTRACT
5.01 TERMINATION BY THE CONTRACTOR
A.Contractor shall have the right to terminate its performance of the Contract only upon the occurrence
of one of the following:
1. The Work is stopped for a period of ninety (90) consecutive days through no act or fault of the
Contractor, any Subcontractor, Sub-subcontractor, their agents or employees, or any other
persons or entities performing portions of the Work under direct or indirect contract with the
Contractor, due to:
a.
b.
the issuance of an order of a court or other public authority having jurisdiction; or
an act of government, such as a declaration of national emergency making material
unavailable;
and Contractor has given City written notice within ten (10) days of the occurrence of such ground
for termination, then the Contractor may, upon thirty (30) additional calendar days written notice to
City, unless the reason has theretofore been cured, terminate its performance of the Work.
2. The Work is stopped for a period of 120 consecutive days through no act or fault of Contractor,
any Subcontractor, Sub-subcontractor, their agents or employees, or any other persons or entities
performing portions of the Work under direct or indirect contract with the Contractor, because the
City has persistently failed to perform any material obligation under the Contract Documents and
fails to cure such default within ninety (90) days after the receipt of notice from Contractor stating
the nature of such default.
B.If Contractor terminates its performance of the Contract in accordance with this Paragraph 5.01, the
City shall pay Contractor for the Work executed through the date of termination as set forth in Paragraph
5.04-C below.
5.02 TERMINATION BY THE CITY FOR CAUSE
A.Grounds
The City shall have the right to terminate the Contractor’s performance of the Contract, in whole or in
part, without liability to City if:
1. Contractor fails promptly to begin the Work under the Contract Documents; or
2. Contractor refuses or fails to supply enough properly skilled workers or proper materials; or
3. Contractor fails to perform the Work in accordance with the Contract Documents, including
conforming to applicable standards set forth therein in constructing the Project, or refuses to
remove and replace rejected materials or unacceptable Work; or
4. Contractor discontinues the prosecution of the Work (exclusive of work stoppage: (a) due to
termination by City; or (b) due to and during the continuance of a Force Majeure event or
suspension by City); or
Page 37 of 120
.
.
Item 8 Page 40 of 221
5. Contractor fails to resume performance of Work which has been suspended or stopped, within a
reasonable time after receipt of notice from City to do so or (if applicable) after cessation of the
event preventing performance; or
6. Any representation or warranty made by Contractor in the Contract Documents or any certificate,
schedule, instrument, or other document delivered by Contractor pursuant to the Contract
Documents shall have been false or materially misleading when made; or
7. Contractor fails to make payment to Subcontractors or Material Suppliers for materials or labor in
accordance with the respective Contract Documents and applicable law; or
8. Contractor disregards laws, ordinances, or rules, regulations, or orders of a public authority having
jurisdiction; or
9. Contractor is guilty of breach of a provision of the Contract Documents; or
10. Contractor becomes insolvent, is adjudicated bankrupt, or makes a general assignment for the
benefit of creditors and fails to provide City with adequate assurances of Contractor’s ability to
satisfy its contractual obligations.
A receiver, trustee, or other judicial officer shall not have any right, title, or interest in or to the Contract.
Upon that person’s appointment, City has, at its option and sole discretion, the right to immediately
cancel the Contract and declare it null and void.
B.City’s Rights.
When any of the reasons specified in Paragraph 5.02-A exist, the City may, in addition to and without
prejudice to any other rights or remedies of the City, and after giving the Contractor five (5) calendar
days written notice, terminate Contractor’s performance of the Work, in whole or in part, and may:
1. Take possession of the site and all materials, equipment, tools, construction equipment, and
machinery thereon owned by the Contractor;
2. Withhold from Contractor amounts unpaid hereunder and to offset such amounts against damages
or losses incurred by City;
3. Accept assignment of subcontracts from Contractor, at the sole discretion of City, and
4. Finish the Work by whatever reasonable method the City may deem expedient.
Upon request of the Contractor, the City shall furnish to the Contractor a detailed accounting of the
costs incurred by the City in finishing the Work.
C.
D.
Costs
If City’s costs to complete and damages incurred due to Contractor’s default exceed the unpaid
Contract balance, the Contractor shall pay the difference to the City.
Wrongful Termination
If it has been adjudicated or otherwise determined that City has wrongfully terminated the Contractor
Page 38 of 120
.
.
Item 8 Page 41 of 221
for cause, then said termination shall be deemed converted to a termination for convenience as set
forth in Paragraph 5.04 and Contractor’s remedy for wrongful termination in such event shall be limited
to the recovery of the payments permitted for termination for convenience as set forth in Paragraph
5.04.
5.03 PARTIAL DELETION OR SUSPENSION OF WORK BY THE CITY
A.Contractor agrees that the City may determine whether any or all of the Work described in the Contract
Documents shall be deleted or performance suspended without electing to terminate the Contractor’s
performance under the Contract and without any penalty being incurred by the City.
B.Any such partial deletion or suspension of the Work shall in no way void or invalidate the Contract nor
shall it provide Contractor with any basis for seeking payment from City for Work deleted or suspended
except to the extent such Work has already been performed and is otherwise compensable under the
Contract.
C.
D.
The City shall have the right to later have any such suspended or deleted Work performed by Contractor
or others without any penalty to the City.
In the event of any partial or complete deletion or suspension of Work, the City shall furnish Contractor
with prompt written notice thereof, and the City shall be entitled to take possession of and have as its
property all Record Documents, Accounting Records, and other data prepared by Contractor or its
Subcontractors.
E.Suspension for Convenience.
1. The City may at any time and from time to time, without cause, order the Contractor, in writing, to
suspend, delay, or interrupt the Work in whole or in part for such period of time as the City may
determine. Such order shall be specifically identified as a “Work Suspension Directive” under this
Section.
2. Upon receipt of a Work Suspension Directive, Contractor shall, at the City’s expense, comply with
its terms and take all reasonable steps to minimize costs allocable to the Work covered by the
Work Suspension Directive during the period of Work stoppage.
3. Within the period of suspension, or such extension to that period as is agreed upon by Contractor
and the City, the City shall either cancel the Work Suspension Directive or delete the Work covered
by such Work Suspension Directive by issuing a Change Order or Construction Change Directive.
4. If a Work Suspension Directive is cancelled or expires, Contractor shall continue the Work. A
Change Order or Construction Change Directive will be issued to cover any adjustments of the
Contract Sum and Contract Time necessarily caused by such suspension. No adjustment shall be
made to the extent:
(a) That performance is, was, or would have been so suspended, delayed, or interrupted by
another cause for which the Contractor is responsible; or
(b) That an equitable adjustment is made or denied under another provision of the Contract.
Suspensions for CauseF.
City has the authority by written order to suspend the Work, in whole or in part, without liability to City
Page 39 of 120
.
.
Item 8 Page 42 of 221
for Contractor’s failure to:
1. Correct conditions unsafe for the Project personnel or general public, or
2. Carry out the Contract; or
3. Carry out orders of City.
G.Responsibilities of Contractor During Suspension Periods
During periods that Work is suspended, Contractor shall continue to be responsible for the Work and
shall prevent damage or injury to the Project, provide for drainage, and shall erect necessary temporary
structures, signs or other facilities required to maintain the Project and continue to perform according
to the Contract Documents.
5.04 TERMINATION BY THE CITY FOR CONVENIENCE
A.Grounds
Without limiting any rights which City may have by reason of any default by Contractor hereunder, City
may terminate Contractor’s performance of the Contract, in whole or in part, at any time, for
convenience upon fifteen (15) calendar days written notice to Contractor.
B.Contractor Actions
Upon receipt of such notice, Contractor shall perform the duties required by Paragraph 5.05 below.
At the election of and as directed by the City, any or all of the subcontracts and purchase orders
entered in to by Contractor prior to the effective date of termination shall be terminated or shall be
assigned to City.
C.Compensation
1. If the Parties are unable to agree on the amount of a termination settlement, the City shall pay
the Contractor the following amounts:
a. For Work performed before the effective date of termination, the total (without duplication of
any items) of:
i. The cost of the Work; and
ii. A sum, as overhead and profit on the cost of the Work, determined by the City to be
fair and reasonable. In no event shall Contractor be entitled to recover overhead or
profit on Work not performed.
b. The reasonable costs of settlement of the Work terminated, including:
i. Accounting, clerical, and other expenses reasonably necessary for the preparation
of termination settlement proposals and supporting data, if any; and
ii. Storage, transportation, and other costs reasonably necessary for the preservation,
protection, or disposition of inventory.
Page 40 of 120
.
.
Item 8 Page 43 of 221
2. Such payment shall be Contractor’s exclusive remedy for termination for convenience and will be
due and payable on the same conditions as set forth for final payment to the extent applicable.
Upon receipt of such payment, the Contractor and City shall have no further obligations to each
other except for Contractor’s obligations with respect to warranties, representations, indemnity,
maintenance of insurance, and other obligations that survive termination or Final Completion as
provided for herein.
3. It is understood and agreed that no fee, anticipated profit, compensation for lost opportunity costs,
or other compensation or payment of any kind or character shall be due or payable for unperformed
Work regardless of the basis of termination and the inclusion of this provision within this
subparagraph shall in no way limit its application to termination under this Paragraph.
4. Contractor agrees that each of its subcontracts will reserve for the Contractor the same right of
termination for convenience provided by this Paragraph 5.04.
D.No Consequential Damages
Under no circumstances shall Contractor be entitled to anticipatory or unearned profits or consequential
or other damages as a result of a termination or partial termination under this Article 5. The payment
to Contractor determined in accordance with this Article constitutes Contractor’s exclusive remedy for
a termination hereunder.
5.05 CONTRACTOR’S DUTIES UPON TERMINATION FOR CAUSE OR CONVENIENCE
If the City terminates Contractor’s performance of Work under the Contract, for cause or convenience or if
Contractor terminates a Subcontractor with the City’s approval, Contractor shall:
(1) cease performance of the Work to the extent specified in the notice;
(2) take actions necessary or that the City may direct, for the protection and preservation of the Work;
(3) settle outstanding liabilities, as directed by City;
(4) transfer title and deliver to City Work in progress, specialized equipment necessary to perform the Work;
(5) submit all Record Documents, Accounting Records and other data prepared pursuant to the Contract by
Contractor and/or its Subcontractors, as applicable, to the City with fifteen (15) calendar days after the City’s
notice of termination in an organized, usable form, in both hard copy and electronic/digital form, with all items
properly labeled to the degree of detail specified by the City; and,
(6) except for Work directed by City to be performed prior to the effective date of termination stated in the notice,
incur no further costs or expenses and enter into no further subcontracts and purchase orders.
No compensation shall be due Contractor, if any, until Contractor complies with the requirements of this
Paragraph.
[END OF ARTICLE]
Page 41 of 120
.
.
Item 8 Page 44 of 221
ARTICLE 6 – CHANGES
6.01
6.02
CITY'S RIGHT TO ORDER CHANGES
The City, without invalidating the Contract, may authorize changes in the Work consisting of additions,
deletions, or other revisions, with the Contract Sum and Contract Time being adjusted accordingly, if
necessary. All such changes in the Work shall be authorized by Change Order or Construction Change
Directive and Contractor shall perform such changes in the Work according to the applicable requirements
of the Contract Documents.
APPLICABLE PROVISIONS
Changes in the Work shall be performed under applicable provisions of the Contract Documents. The
Contractor shall proceed promptly and diligently with the change, unless otherwise provided in the Change
Order or Construction Change Directive. It is of the essence to this Contract that all scope changes in the
Work that form the basis of an adjustment of the Contract Sum or Contract Time must be authorized in
advance in writing through either a Change Order or Construction Change Directive. A change in the Contract
Sum or the Contract Time shall be accomplished only by Change Order or Construction Change Directive.
Accordingly, no verbal directions, course of conduct or dealings between the Parties, express or implied
acceptance of alterations or additions to the Work, or claim that the Contract has been abandoned or the City
has been unjustly enriched by any alteration or addition to the Work shall be the basis of any claim for an
increase in any amounts due under the Contract Documents or a change in any time period provided in the
Contract Documents.
6.03 NOTICE OF SCOPE CHANGE
Contractor shall submit written notice of any change in scope to the Director if, in the Contractor’s opinion,
any instruction, request, Drawings, Specifications, action, condition, omission, default, or other situation
occurs that the Contractor believes constitutes a scope change or other matter resulting in Extra Work, for
which Contractor believes it is entitled to an adjustment of the Contract Sum or Contract Time. Such notice
shall be provided prior to performance of the Work affected by such occurrence and within seven (7) calendar
days after the discovery date of the circumstances of such scope change or other matters. The written notice
shall state the date, circumstances, extent of adjustment to the Contact Sum or the Contract Time, if any,
requested. The mere presentation of such notice shall not establish the existence of any right by Contractor
to adjustment of the Contract Sum or Contract Time. Failure to provide such timely written notice described
herein shall constitute a waiver by Contractor of the right to any adjustment to the Contract Sum or Contract
Time on account thereof.
6.04 CHANGE ORDERS
A.Computation
Methods used in determining adjustments to the Contract Sum by Change Order may include those
listed in Paragraph 6.06 below.
B.Accord and Satisfaction
Agreement on any Change Order shall be a full compromise and settlement of all adjustments to
Contract Time and Contract Sum, and compensation for any and all delay, extended or additional
field and home office overhead, disruption, acceleration, inefficiencies, lost labor or equipment
productivity, differing Site conditions, construction interferences and other extraordinary or
Page 42 of 120
.
.
Item 8 Page 45 of 221
consequential damages (hereinafter called "Impacts"), including any ripple or cumulative effects of
said Impacts on the overall Work under the Contract arising directly or indirectly from the
performance of Work described in the Change Order. By execution of any Change Order, Contractor
agrees that the Change Order constitutes a complete accord and satisfaction with respect to all
claims for schedule extension, Impacts, or any costs of whatever nature, character or kind arising
out of or incidental to the Change Order. No action, conduct, omission, product failure or course of
dealing by the City shall act to waive, modify, change, or alter the requirement that (i) Change Order's
must be in writing, signed by the City and Contractor and; (ii) that such written Change Orders are
the exclusive method for effectuating any change to the Contract Sum and/or Contract Time.
6.05 CONSTRUCTION CHANGE DIRECTIVE (FIELD DIRECTIVE)
A.A Construction Change Directive shall be used in the absence of total agreement on the terms of a
Change Order. The City may by Construction Change Directive, without invalidating the Contract,
order changes in the Work within the general scope of the Contract consisting of additions, deletion,
or other revisions, the Contract Sum and Contract Time being adjusted accordingly.
B.
C.
If the Construction Change Directive provides for an adjustment to the Contract Sum, the adjustment
shall be calculated in accordance with Paragraph 6.06 herein (Pricing Changes in the Work).
Upon receipt of the Construction Change Directive, the Contractor shall promptly proceed with the
change in the Work involved and advise the City of the Contractor’s agreement or disagreement with
the method, if any, provided in the Construction Change Directive, for determining the proposed
adjustment in the Contract Sum or Contract Time.
D.If Contractor believes a Construction Change Directive constitutes a basis for adjustment to the
Contract Sum or Contract Time, then Contractor shall give a Notice of Scope Change provided in
Paragraph 6.03, followed by a submission of a Change Order Request as required by Paragraph
6.08. Contractor shall, if requested by City in such Construction Change Directive or in a subsequent
Construction Change Directive, proceed with the performance of the Work as described in the
Construction Change Directive. Failure of Contractor to proceed with the performance of Work, as
described in the Construction Change Directive shall give the City the right to carry out the Work, as
set forth in Paragraph 2.05.
E.
F.
A Construction Change Directive signed by the Contractor indicates the Contractor’s agreement
therewith, including adjustment in Contract Sum and Contract Time or the method for determining
them. Such agreement shall be effective immediately and shall be recorded as a Change Order.
If the Contractor does not respond promptly or disagrees with the method for adjustment in the
Contract Sum, the method and the adjustment shall be determined by the City on the basis of
reasonable expenditures and savings of those performing the Work attributable to the change,
including, in the case of an increase in the Contract Sum, Allowable Mark-Ups in accordance with
Paragraph 6.06(E) herein.
6.06 PRICING CHANGES IN THE WORK
A.Alternative Methods of Pricing
The amount of any adjustment by Change Order or Construction Change Directive increasing or
decreasing the Contract Sum shall be determined by the Director using one or a combination of the
following methods:
Page 43 of 120
.
.
Item 8 Page 46 of 221
1. Lump Sum. By mutual acceptance of a lump sum proposal from Contractor properly itemized
and supported by sufficient substantiating data to permit evaluation. Such proposal shall be
based solely on Allowable Costs, as defined in Subparagraph 6.06-C, and Allowable Mark-Ups,
as defined in Subparagraph 6.06-E, and shall not include any costs or expense that is not
permitted by the terms of any provision of the Contract Documents.
2. Unit Prices. By unit prices contained in Contractor’s original Bid and incorporated in the Contract
Documents or fixed by subsequent agreement between City and Contractor. Unless otherwise
stated in the Bidding Documents, unit prices stated in the Contract Documents or agreed upon
by the County and Contractor shall be deemed to include and encompass all Allowable Markups.
3. Time and Materials. By calculating the actual Allowable Costs directly incurred, plus a sum for
Allowable Mark-Ups on such Allowable Costs.
4. Deletion of Work. By Unit Prices contained in Contractor’s original Bid and incorporated in the
Contract Documents, or by using the Schedule of Values to determine the value of the decrease
of the Contract Sum, less the value of any Work performed, plus a reasonable percentage of
the decrease for the Contractor’s saved overhead unless the Schedule of Values allocates
general conditions costs to individual line items, in which case no percentage of the decrease
shall be added. When a change consists of both addition and deletion of Work, the added costs
and deleted costs shall be calculated separately, and then added together, resulting in the net
cost for the change. The Allowable Mark-Up shall be applied to this net cost.
B.Contractor Maintenance of Daily Records for Changes
1. In the event that Contractor is directed to perform any Extra Work, or should Contractor
encounter conditions which the Contractor believes would obligate the City to adjust the Contract
Sum and/or the Contract Time, Contractor shall maintain detailed records of the cost of such
changes on a daily basis summarized in a daily report supplemented by back-up records. Such
records shall include without limitation:
a.
b.
c.
Labor. At the close of each day on which such Extra Work is performed, Contractor
shall submit an Extra Work labor report, on forms provided by Director, to Director that
sets forth a list of the actual hours spent in performing the Extra Work, that clearly
differentiates between the labor expended on the Extra Work and other Work, and the
Allowable Costs for such Extra Work performed that day showing the names of
workers, their classifications, hours worked and hourly rates.
Materials, Equipment. A list of Allowable Costs of materials and equipment consumed
in the performance of the Extra Work on the day on which such Extra Work is
performed, together with copies of applicable delivery tickets and unit prices for all
materials and for all equipment used the type of equipment, identification number,
hours of operation (including loading and transportation) and hourly/daily rates involved
for that day.
Other Services or Expenditures. A list of other services and expenditures constituting
Allowable Costs incurred in performance of the Extra Work on the day on which such
Extra Work is performed, along with documentation verifying the amounts thereof in
such detail as Director may require.
Page 44 of 120
.
.
Item 8 Page 47 of 221
2. In the event that more than one change to the Work is performed by the Contractor in a calendar
day, Contractor shall maintain separate records of labor, construction equipment, materials, and
equipment for each such change. In the event that any Subcontractor of any tier shall provide
or perform any portion of any change to the Work, Contractor shall require that each such
Subcontractor maintain records in accordance with this Section.
3. Each daily record maintained hereunder shall be signed by Contractor; such signature shall be
deemed Contractor’s representation and warranty that all information contained therein is true,
accurate, complete, and relates only to the change referenced therein. All records maintained
by Subcontractors of any tier, relating to the costs of a change in the Work shall be signed by
such Subcontractor’s authorized project manager or superintendent.
All such records shall be forwarded to the Director on the day the Work is performed (same day)
for independent verification. The Director shall attempt to review and reconcile costs for
changes on a daily basis. Records not available on the day on which the Extra Work is
performed, such as, but not limited to, material invoices, shall be submitted as soon as they are
available but not later than five (5) calendar days after the earlier of the day of delivery or
incorporation of the particular item of Extra Work at the Site.
4. The Director may additionally require authentication of all time and material tickets and invoices
by persons designated by the Director for such purpose. In the event that Contractor shall fail
or refuse, for any reason, to maintain or make available for inspection, review, and/or
reproduction such records, adjustments to the Contract Sum or Contract Time, if any, on account
of any change to the Work may be deemed waived for that day. Contractor’s obligation to
maintain back-up records hereunder is in addition to, and not in lieu of, any other Contractor
obligation under the Contract Documents with respect to changes to the Work.
5. Waiver by Contractor. Failure to submit such records as are required by this Paragraph daily
shall waive any rights for recovery of Allowable Costs incurred for Extra Work performed that
day. The failure of the Contractor to secure any required authentication shall, if the City elects
in its sole discretion to treat it as such, constitute a waiver by the Contractor of any right to
adjustment of the Contract Sum for the Allowable Cost of all or that portion of the Extra Work
covered by such non-authenticated ticket or invoice.
C.Allowable Costs
The term “Allowable Costs” shall mean in the case of Extra Work actual costs incurred by Contractor
and/or any Subcontractor, regardless of tier, and necessarily involved in direct performance of the
Extra Work, or in the case of deleted work the actual costs that would have been incurred in
performing deleted work by Contractor and/or any Subcontractor, regardless of tier, and shall be
limited to the following costs:
1. Labor. Straight-time wages or salaries, and overtime wages and salaries specifically authorized
by City in writing, for employees employed at the site, or at fabrication sites off the site, in the
direct performance of the Extra Work or that would have been incurred in the direct performance
of the deleted work, based on the actual cost for wages prevailing locally for each craft or type
of workers at the time the Extra Work is done or the deleted work is ordered eliminated. Labor
costs for equipment operators and helpers shall be reported only when such costs are not
included in the invoice for equipment rental. The use of labor classification which would increase
the Allowable Cost for Extra Work will not be permitted unless Contractor establishes the
necessity for such additional costs.
Page 45 of 120
.
.
Item 8 Page 48 of 221
2. Benefits. Payroll taxes, insurance, health and welfare, pension, vacation, apprenticeship funds
and benefits required by lawful collective bargaining agreements for employees on straight-time
wages or salaries, and on overtime wages and salaries specifically authorized by City in writing,
for employees employed at the site, or at fabrication sites off the site, in the direct performance
of the Extra Work or that would have been incurred in the direct performance of the deleted
work.
3. Materials, Consumables. Costs of materials and consumable items which are furnished and
incorporated into the Work, as approved by City, or that would have been incorporated into the
Work in the case of deleted work shall be at the lowest price available to Contractor but in no
event shall such costs exceed competitive wholesale prices obtainable from other
Subcontractors, suppliers, manufacturers and distributors in the general vicinity of the site. If
City determines, in its discretion, that the cost of materials is excessive, or if Contractor fails to
furnish satisfactory evidence of the cost from the actual supplier thereof, then in either case the
cost of the materials shall be deemed to be the lowest wholesale price at which similar materials
are available in the quantities required at the time they were needed. The City reserves the right
to furnish such materials as it deems advisable, and Contractor shall have no claim for costs or
profits on materials so furnished. Material invoices must be included with the extra work report
to obtain payment.
4. Taxes. Sales taxes on the costs of materials and consumable items described in Paragraph
5.04-C.3 above.
5. Tool, Equipment Rental. Rental charges for necessary machinery and equipment, whether
owned or hired, as authorized in writing by City, exclusive of hand tools, used directly in the
performance of the Extra Work or that would have been used in the direct performance of the
deleted work. Regardless of ownership, such rental charges shall not exceed the hourly rate
derived from the most recently published “Rental Rate Blue Book for Construction Equipment”
or the “Rental Rate Blue Book for Older Construction Equipment,” as published by K-111, San
Jose, California, which is in effect at the time of commencement of the changed work. The
Contractor shall attach a copy of the rate schedule to the daily reports required by Paragraph
6.06-B, above. The charges for any machinery and equipment shall cease when the use thereof
is no longer necessary for the Extra Work or deleted work. No charge shall be allowed for use
of equipment or tools which have a replacement value of $500 or less. The allowable rental
rates shall include the cost of fuel, power oil, lubrication, supplies, small tools, necessary
attachments, loading, transportation, repairs and maintenance of any kind, depreciation,
storage, insurance, and all incidentals. Notwithstanding the provisions of Paragraph 6.06-E
below, no mark-up shall be allowed for overhead, profit or bond premiums for use of equipment
if the equipment is supplied by an equipment rental firm. If equipment is used intermittently and,
when not in use, could be returned to its rental source at less expense to City than holding it at
the Site, it shall be returned, unless Contractor elects to keep it at the Site at no expense to City.
Costs incurred while equipment is inoperative due to breakdowns, regular maintenance, or for
non-Working Days shall not be allowed. The rental time shall include the time required to move
the equipment to the Work from the nearest available source for rental of such equipment and
to return it to the source. If such equipment is not moved by its own power, then loading and
transportation will be allowed. Neither moving time nor loading and transportation costs will be
paid if the equipment is for use on the Project unrelated to the Extra Work. All equipment shall
be acceptable to City, in good working condition, and suitable for the purpose for which it is to
be used.
Page 46 of 120
.
.
Item 8 Page 49 of 221
6. Royalties. Additional or saved costs of royalties due to the performance of the Extra Work or
deleted work.
7. Insurance, Bonds. Additional or saved costs of insurance and bonds, provided, however, that
for Extra Work such costs shall not exceed one percent (1%) of Items 1 through 6 above.
D.Costs Not Allowed
Allowable Costs shall not include any of the following:
1. Wages, salaries, fringe benefits and payroll taxes of Contractor’s and all Subcontractor’s non-
craft labor (above a Foreman level);
2. Overhead (including home office overhead), administrative or general expenses of any kind
including engineering, estimating, scheduling, drafting, detailing, etc., incurred in connection
with Extra Work;
3. Vehicles not dedicated solely for the performance of the extra of deleted work;
4. Small tools (replacement value not exceeding $500);
5. Office expenses, including secretarial and administrative staff, materials and supplies;
6. On-site and off-site trailer and storage rental and expenses;
7. Site fencing;
8. Utilities, including gas, electric, sewer, water, telephone, telefax, copier equipment;
9. Computer and data processing personnel, equipment and software;
10. Federal, state of local business income and franchise taxes;
11. Losses of efficiency or productivity; and
12. Costs and expenses of any kind or item not specifically and expressly included in Paragraph
6.06-C.
E.Allowable Mark-Up
1. Extra Work by contractor (Markup): The following percentages shall be added to the Contractor’s
costs and shall constitute the markup for all overhead and profits:
Labor
Materials
Equipment Rental
Other Items and Expenditures
33%
15%
15%
15%
2. Extra Work by Subcontractor (Markup): When all or any part of the extra work is performed by a
Subcontractor, the markup provided for the Contractor in 6.06.E.1 shall apply to the
Subcontractor’s actual costs. A markup of 5% on the subcontracted portion of each extra work
may be added for the Contractor.
Page 47 of 120
.
.
Item 8 Page 50 of 221
F.Net Allowable Costs
If anyone scope change involves both Extra Work and deleted work in the same portion of the Work
and the additive allowable costs exceed the deductive allowable costs, the Allowable Markups on
the Extra Work will be only the difference between the two amounts.
6.07 CITY ORIGINATED REQUEST FOR ITEMIZED CHANGE ORDER PROPOSAL REQUEST
City may issue a Construction Change Directive or other written request to Contractor describing a proposed
change to the Work and requesting the Contractor submit an itemized change order proposal in a format
acceptable to City within ten (10) calendar days after City issues the request. The Contractor's change order
proposal shall include an analysis of impacts to cost and time, if any, to perform additional work, change
Work or delete Work, as applicable, including the effects and impacts, if any, on unchanged Work, estimates
of costs (broken down by the cost categories listed in this Paragraph), and Contractor's proposed methods
to minimize costs, delay, and disruption to the performance of the Work. If Contractor fails to submit a written
change order proposal within such period of time, it shall be presumed that the change described in the City's
original proposal request will not result in an increase to the Contract Sum or Contract Time and the change
shall be performed by Contractor without additional compensation to Contractor. City's request for itemized
change order proposal request does not authorize the Contractor to commence performance of the change.
If City desires that the proposed change be performed, the Work shall be authorized according to the Change
Order or Construction Change Directive procedures set forth herein.
6.08 CONTRACTOR ORIGINATED CHANGE ORDER REQUEST (COR)
If the Contractor believes that instructions issued by the City after the effective date of the Contract will result
in changes to the Contract Sum or Contract Time or if the Contractor otherwise becomes aware of the need
for or desirability of a change in the Work, Contractor may submit a written Change Order Request ("COR")
to the City in writing, in a format acceptable to City and in accordance with the notice provisions and other
requirements of Article 7 below for Claims. The COR must specify the reasons for the proposed change, cost
impacts and relevant circumstances and impacts on the Construction Schedule. The document shall be
complete in its description of the Work, its material and labor quantities and detail, and must support and
justify the costs and credits claimed by the Contractor. A Critical Path Method schedule Fragnet is required
to support and justify any additional time of performance requested by the Contractor. The City will not review
any COR which is incomplete. The Contractor may request additional compensation and/or time through a
COR but not for instances that occurred more than ten (10) calendar days prior to the notice date. Contractor's
failure to initiate a COR within this ten-day period or to provide detailed back-up documentation to
substantiate the COR within thirty (30) calendar days of the initial written notice shall be deemed a waiver of
the right to adjustment of the Contract Sum or the Contract Time for the alleged change. Any COR that is
approved by the City shall be incorporated in a Change Order or Construction Change Directive. If the COR
is denied but the Contractor believes that it does have merit, the Contractor shall proceed with the disputed
Work and may submit a Claim in accordance with the procedures set forth herein.
6.09 ISSUANCE OF WORK DIRECTIVE (UNILATERAL).
In the event of a dispute as to whether or not Extra Work is required, City shall have the right to unilaterally
issue a Work Directive; Contractor shall continue performance of disputed Work pending resolution and shall
maintain and submit to City all accounting and cost data necessary to substantiate Contractor’s cost of such
disputed Work.
[END OF ARTICLE]
Page 48 of 120
.
.
Item 8 Page 51 of 221
ARTICLE 7 - CONTRACT PAYMENTS AND CLAIMS
7.01 GENERAL
A.
B.
C.
Payment will be made at the price for each item listed on the bidding form or as Extra Work as provided
in the General Conditions.
Initial progress payment will not be made prior to approval by the Director of the Schedule of Values,
the Construction Progress Schedule, and the Schedule of Submittals.
No subsequent progress payment will be made prior to receipt by the Director of the monthly revision
of the Construction Progress Schedule.
7.02 SCHEDULE OF VALUES FOR PAYMENTS
A.Submission
Upon City’s request, the three (3) lowest bidders shall complete and submit a Preliminary Schedule
of Values, within seven (7) calendar days.
In addition, Contractor shall complete and furnish within seven (7) calendar days after receiving the
Notice of Award of the Construction Contract a Final Schedule of Values giving a complete
breakdown of the Contract Sum for each component of the Work.
B.Content
The Schedule of Values shall be in sufficient detail as the Director may, in its discretion, deem
necessary to evaluate progress at any point in the performance of the Work. Unless otherwise
specified in the Contract Documents, the Schedule of Values shall include, without limitation, a
breakdown of the general categories of Subcontractor work, direct overhead, profit and contingency,
and a further breakdown of the general categories of Subcontractor work into separate trade line
items of costs for Subcontractor services, labor and material, which is based on actual Subcontractor
contract, subcontract, purchase order or vendor prices. If requested by Director, Contractor shall
revise the Schedule of Values to allocate sums for Contractor overhead, profit and/or contingency
among the individual line items for trade portions of the Work. No amounts shall be reflected in the
Schedule of Values or Application for Payment for Extra Work or Deleted Work for which a Change
Order has not been executed by Contractor and City or for which a Construction Change Directive
has not been issued by City. Amounts that have been mutually agreed to by Change Order or
unilaterally determined by City pursuant to a Construction Change Directive shall be segregated from
the cost of the base Contract Work and separately listed by line item in the Schedule of Values. The
Schedule of Values must be prepared in sufficient detail and supported by sufficient data to
substantiate its accuracy as the Director may require.
C.Applications for Payment
The Schedule of Values, when approved by the Director, shall be used as a basis for Contractor's
Applications for Payment and may be considered as fixing a basis for adjustments to the Contract
Sum.
Page 49 of 120
.
.
Item 8 Page 52 of 221
D.Revisions
If, at any time, it is determined that the Schedule of Values does not allocate the Contract Sum in a
manner that reasonably and fairly reflects the actual costs anticipated to be progressively incurred
by Contractor, it shall be revised and resubmitted for the Director’s approval.
7.03 APPLICATIONS FOR PAYMENT
A.
B.
Marked Schedule of Values
Five (5) Days prior to the date set forth in Paragraph 7.03-B below for the monthly progress payment
meeting, Contractor shall submit to Director a copy of the proposed Schedule of Values, marked to
show the percentage of completion certified by Contractor for each line item in the Schedule of
Values, including any stored materials approved for payment by City pursuant to Paragraph 7.03-D,
below and any withholdings from Contractor proposed by Director.
Monthly Review
For the purpose of expediting the progress payment procedure, Contractor shall meet with the
Director on or before the twentieth (20th) day of each month to review the Contractor's marked
Schedule of Values prepared in accordance with Paragraph 7.03-A, above. The Director shall revise
as appropriate and sign the marked Schedule of Values to verify such review. If any item in the
marked Schedule of Values submitted for payment is disputed during this review, Contractor agrees
to use its best efforts to resolve the disputed items with the Director before submitting its Application
for Payment. If the Director and Contractor cannot agree, then the percentage completion shall be
established at such percentage as the Director, in good faith, determines is appropriate to the actual
progress of the Work. No inaccuracy or error in the Director’s good faith estimate shall operate to
release Contractor or Surety from any responsibility or liability arising from or related to performance
of the Work. The Director shall have the right subsequently to correct any error and dispute any item
submitted in Contractor's Application for Payment, regardless of whether an item was identified as
disputed in the review process provided for herein.
C.Certification
Each Application for Payment shall be signed and certified by Contractor under penalty of perjury to
City that:
1. The data comprising the Application for Payment is accurate and the Work has progressed to
the point indicated;
2. To the best of Contractor's knowledge, information and belief, the Work is in accordance with
the Contract Documents;
3. Contractor is entitled to payment in the amount certified; and
4. All sums previously applied for by Contractor on account of Work performed by Subcontractors
and that have been paid by City have been paid to the Subcontractors performing such Work,
without any retention, withholding or backcharge by Contractor.
Page 50 of 120
.
.
Item 8 Page 53 of 221
D.Stored Materials
Payments may be made by City, at its discretion, on account of materials or equipment not
incorporated into the Work but delivered on the ground at the Site and suitably stored by Contractor
or stored off-Site under the control of City. Such payments shall only be considered upon submission
by Contractor of satisfactory evidence that it has acquired title to same, that the material or equipment
will be utilized in the Work and that the material is satisfactorily stored, protected and insured, and
that such other procedures are in place satisfactory to City to protect City's interests. To be
considered for payment, materials or equipment stored off-Site shall, in addition to the above
requirements and unless otherwise specifically approved by City in writing, be stored in a bonded
warehouse, fully insured, and available to City for inspection. City shall have sole discretion to
determine the amount of material and equipment that may be stored on the Site at any given time.
7.04 PROGRESS PAYMENTS
A. Conditions to Progress Payments
Contractor shall submit its Application for Payment to the Director, using such forms as required by
City, once a month on or before the first (1st) Day of the month following the month in which the
Work that is the subject of such Application for Payment was performed. Without limitation to any
other provisions of the Contract Documents, the following shall be conditions precedent to a proper
submission and to the Director approval of each Application for Payment:
1. Submission of a Schedule of Values that reflects the percentages of completion either agreed
to or determined by Director in accordance with Paragraph 7.03-B, above;
2. Submission of the Contractor's certification required by Paragraph 7.03-C, above;
3. Submission of conditional releases of stop notice, if any, and bond rights upon progress
payment, complying with California Civil Code Section 8132, for all Work performed during the
time period covered by the current Application for Payment, signed by Contractor, its
Subcontractors of every tier, and all material suppliers to each, and (2) forms of unconditional
release of stop notice and bond rights upon progress payment, complying with California Civil
Code Section 8134 for all Work performed during the time period covered by the previous
Application for Payment, signed by Contractor, its Subcontractors of every tier and all material
suppliers to each;
4. Compliance by Contractor with its obligation for maintenance of As-Builts as required by the
Contract Documents;
5. Compliance by Contractor with its obligation for submission of monthly and daily reports as
required by the Contract Documents;
6. Compliance by Contractor with its obligations for submission of scheduling information and
updating of the Construction Schedule as required by Article 4, above and other provisions of
the Contract Documents pertaining to preparation or updating of schedule information;
7. Submission of certified payroll records as required by the Contract Documents;
8. Submission of certifications by Contractor and each Subcontractor as required by applicable
collective bargaining agreements certifying that all employee benefit contributions due and
Page 51 of 120
.
.
Item 8 Page 54 of 221
owed pursuant to any applicable collective bargaining agreement have been paid in full; and
9. Compliance by Contractor with all of its other obligations for submission of documentation or
performance of conditions which, by the terms of the Contract Documents, constitute conditions
to Contractor's right to receive payment for Work performed.
B.Payments by City
Pursuant to California Public Contract Code Section 20104.50, City shall make progress payment of
undisputed sums due within thirty (30) Days after receipt by Director of an undisputed and properly
submitted Application for Payment, calculated on the basis of ninety-five percent (95%) of value
determined pursuant to Paragraph 7.03-B above of the following:
1. The portion of the Work permanently installed and in place;
2. Plus, the value of materials delivered on the ground or in storage as approved by City pursuant
to Paragraph 7.03-D, above,
3. Less, the aggregate of previous payments, and
4. Less, any other withholdings authorized by the Contract Documents.
Rejection by CityC.
D.
Any Application for Payment determined not to be undisputed, proper and suitable for payment shall
be returned to Contractor as soon as practicable, but not later than seven (7) Days, after receipt by
City accompanied by an written explanation of the reasons why the payment request was rejected.
Failure by City or Director to either timely reject an Application for Payment or specify any grounds
for rejection shall not constitute a waiver of any rights by City. Applications for Payment that are
rejected shall be corrected and resubmitted within seven (7) Days after receipt by Contractor.
Interest
If City fails to make a progress payment to Contractor as required by Paragraph 7.04-B, above, City
shall pay interest to Contractor equivalent to the legal rate set forth in subdivision (a) of California
Code of Civil Procedure Section 685.010. The number of Days available to City to make payment
pursuant to Paragraph 7.04-B, above without incurring interest pursuant to this Paragraph shall be
reduced by the number of Days by which City exceeds the seven (7) Day return requirement
applicable to City as set forth in Paragraph 7.04-C, above.
7.05 FINAL PAYMENT
A.Retention
ln addition to withholdings permitted by Paragraph 7.09 below, a sum equal to five percent (5%) of
all sums otherwise due to Contractor as progress payments shall be withheld by city pursuant to
Paragraph 7.04-B from each progress payment (“Retention”) and retained until such time as it is due
as described herein. A higher Retention amount may be approved by the City Council where project
is deemed “substantially complex” by City Council.
Page 52 of 120
.
.
Item 8 Page 55 of 221
B.Conditions to Final Payment
Contractor shall submit its Application for Final Payment, using such forms as required by Director,
prior to requesting a final inspection of the Work in accordance with Paragraph 3.06 above. Such
Application for Final Payment shall be accompanied by all the following:
1. An affidavit that payrolls, bills for materials and equipment, and other indebtedness connected
with the Project for which City or City's property or funds might be liable have been paid or
otherwise satisfied;
2. Contractor’s certification as required by Paragraph 7.03-C, above;
3. Consent of surety, if any, to Final Payment;
4. A certificate evidencing that the insurance required by the Contract Documents is in force;
5. Conditional Waiver and Release Upon Final Payment in the form required by California Civil
Code Section 8136 executed by Contractor, all Subcontractors of every tier and by all material
suppliers of each, covering the final payment period;
6. Unconditional Waiver and Release Upon Progress Payment in the form required by California
Civil Code Section 8136 executed by Contractor, all Subcontractors of every tier and by all
material suppliers of each, covering the previous payment period;
7. All Record Documents (including, without limitation, complete and accurate As-Built drawings
which shall be kept up to date during the performance of the Work);
8. Documentation that Contractor has inspected, tested, and adjusted performance if every system
or facility of the Work to ensure that overall performance is in compliance with the terms of the
Contract Documents;
9. Four (4) copies of all warranties from vendors and Subcontractors, operation and maintenance
manuals, instructions and related agreements, and equipment certifications and similar
documents;
10. Certifications by Contractor and each Subcontractor as required by applicable collective
bargaining agreements that all employee benefit contributions due and owing pursuant to any
applicable collective bargaining agreement have been paid in full;
11. Releases of rights and claims relating to patents and trademarks, as required by the Contract
Documents; and
12. Any other documents or information required by the Contract Documents as a condition of Final
Payment or Final Completion.
C.Final Payment
Pursuant to the Public Contract Code Section 7107, within sixty (60) Days after City issues the Notice
Page 53 of 120
.
.
Item 8 Page 56 of 221
of Completion to Contractor, the Final Payment, including Retention, shall be released to Contractor,
subject to the City’s right to withhold 150% of any disputed amounts.
D.Disputed Amounts
Pursuant to California Public Contract Code 7107, City may deduct and withhold from the Final
Payment due under Paragraph 7.05-C, above, an amount up to 150% of any disputed amounts,
including, without limitation, amounts to protect City against any loss caused or threatened as a result
of Contractor's failing to fully perform all of those obligations that are required to be fulfilled by
Contractor as a condition to Final Completion and Final Payment. Alternatively, City may elect, in its
sole discretion, to accept the Work without correction or completion and adjust the Contract Sum
pursuant to the Contract Documents.
E.Acceptance of Final Payment
Acceptance of Final Payment by Contractor shall constitute a waiver of all rights by Contractor
against City for recovery of any loss, excepting only those Claims that have been submitted by
Contractor in the manner required by the Contract Documents prior to or at the time of the Final
Payment.
7.06 MISCELLANEOUS
A. Joint Payment
City shall have the right, if deemed necessary in its sole discretion, to issue joint checks made
payable to Contractor and any Subcontractor(s) of any Tier. The joint check payees shall be solely
responsible for the allocation and disbursement of funds included as part of any such joint payment.
Endorsement on such check by a payee shall be conclusively presumed to constitute receipt of
payment by such payee. In no event shall any joint check payment be construed to create any
contract between City and a Subcontractor of any Tier, any obligation from City to such Subcontractor
or any third party rights against City or Director.
B.Withholding/Duty to Proceed
The payment, withholding or retention of all or any portion of any payment claimed to be due and
owing to Contractor shall not operate in any way to relieve Contractor from its obligations under the
Contract Documents. Contractor shall continue diligently to prosecute the Work without reference
to the payment, withholding or retention of any payment. The partial payment, withholding or
retention by City in good faith of any disputed portion of a payment, whether ultimately determined
to be correctly or incorrectly asserted, shall not constitute a breach by City of the Construction
Contract and shall not be grounds for an adjustment of the Contract Sum or Contract Time.
C.
D.
No Acceptance
No payment by City or partial or entire use of the Work by City shall be construed as approval or
acceptance of the Work, or any portion thereof.
Contractor Payment Warranty
Submission of an Application for Payment shall constitute a representation and warranty by
Contractor that:
Page 54 of 120
.
.
Item 8 Page 57 of 221
1. Title to Work covered by an Application for Payment will pass to City either by incorporation into
the construction or upon receipt of payment by Contractor, whichever occurs first; and
2. Work covered by previous Applications for Payment are free and clear of liens, stop notices,
claims, security interests or encumbrances imposed by the Contractor or any other person.
E.Corrections
No inaccuracy or error in any Application for Payment provided by Contractor shall operate to release
Contractor from the error, or from losses arising from the Work, or from any obligation imposed by
the Contract Documents. City retains the right to subsequently correct any error made in any
previously approved Application for Payment, or progress payment issued, by adjustments to
subsequent payments.
7.07 PAYMENTS BY CONTRACTOR
Contractor shall not include in its Applications for Payment sums on account of any Subcontractor's portion
of the Work that it does not intend to pay to such Subcontractor. Upon receipt of payment from City, Contractor
shall pay the Subcontractor performing Work on the Project, out of the amount paid to Contractor on account
of such Subcontractor's portion of the Work, the amount to which said Subcontractor is entitled in accordance
with the terms of its contract with Contractor and applicable laws, including, without limitation, California Public
Contract Code Section 7107. Contractor shall remain responsible notwithstanding a withholding by City
pursuant to the terms of these Contract Documents, to promptly satisfy from its own funds sums due to all
Subcontractors who have performed Work that is included in Contractor's Application for Payment. Contractor
shall, by appropriate agreement, require each Subcontractor to make payments to its subcontractors and
material suppliers in similar manner. City shall have no obligation to pay or be responsible in any way for
payment to a Subcontractor of any tier or material supplier.
7.08 PAYMENTS WITHHELD
A.Withholding by City
In addition to any other amounts which City may have the right to retain under the Contract
Documents, City may withhold a sufficient amount of any payment otherwise due to Contractor as
City, in its sole discretion, may deem necessary to cover actual or threatened loss due to any of the
following:
1. Third Party Claims. Third-party claims or stop notices filed or reasonable evidence indicating
probable filing of such claims or stop notices. City shall promptly inform Contractor of any third
party claims related to this Contract;
2. Defective Work. Defective Work not remedied;
3. Nonpayment. Failure of Contractor to make proper payments to its Subcontractors for services,
labor, materials or equipment;
4. Inability to Complete. Reasonable doubt that the Work can be completed for the then unpaid
balance of the Contract Sum or within the Contract Time;
Page 55 of 120
.
.
Item 8 Page 58 of 221
5. Violation of Applicable Laws. Failure of Contractor or its Subcontractors to comply with
applicable laws or lawful orders of governmental authorities;
6. Penalty. Any claim or penalty asserted against City by virtue of Contractor’s failure to comply
with applicable laws or lawful orders of governmental authorities (including, without limitation
labor laws);
7. Failure to Meet Contract Time. Any damages which may accrue as a result of Contractor failing
to meet the Construction Schedule or failing to perform within the Contract Time;
8. Setoff. Any reason specified elsewhere in the Contract Documents as grounds for a withholding
offset or set off or that would legally entitle City to a set-off or recoupment;
9. Consultant Services. Additional professional, consultant or inspection services required due to
Contractor’s failure to comply with the Contract Documents;
10. Liquidated Damages. Liquidated damages assessed against Contractor;
11. Materials. Materials ordered by City pursuant to the Contract Documents;
12. Damages. Loss caused by Contractor or Subcontractor to City, Separate Contractors or any
other person or entity under contract to City;
13. Clean Up. Clean up performed by City and chargeable to Contractor pursuant to the Contract
Documents;
14. Employee Benefits. Failure of Contractor to pay contributions due and owing to employee
benefits funds pursuant to any applicable collective bargaining agreement or trust agreement;
15. Required Documents. Failure of Contractor to submit on a timely basis, proper and sufficient
documentation required by the Contract Documents, including, without limitation, Construction
Schedule updates, ‘look ahead’ schedules, Submittals, Schedules of Values, information on
Subcontractors, Change Orders, certifications and other required reports or documentation; and
16. Other Breach. A breach of any obligation or provision of the Contract Documents.
Release of WithholdingB.
C.
If and when City determines, in its sole discretion, that the above grounds for withholding have been
removed and that all losses incurred or threatened have been paid, credited or otherwise satisfied, then
payment shall be made for amounts withheld because of them.
Application of Withholding
City may apply sums withheld pursuant to Paragraph 7.08-A above, in payment of any loss or
threatened loss as City determines, in its sole discretion, to be appropriate. Such payments may be
made without a prior judicial determination of City’s actual rights with respect to such loss. Contractor
agrees and hereby designates City as its agent for such purposes, and agrees that such payments
shall be considered as payments made under Construction Contract by City to Contractor. City shall
not be liable to Contractor for such payments made in good faith. City shall submit to Contractor an
accounting of such funds disbursed on behalf of Contractor. As an alternative to such payment, City
Page 56 of 120
.
.
Item 8 Page 59 of 221
may, in its sole discretion, elect to exercise its right to adjust the Contract Sum as provided in the
Contract Documents.
D.Continuous Performance
Provided City pays the undisputed portion, if any, of funds withheld in good faith, Contractor shall
maintain continuous and uninterrupted performance of the Work during the pendency of any disputes
or disagreements with City.
7.09 SUBSTITUTION OF SECURITIES
A.Public Contract Code
Pursuant to the requirements of California Public Contract Code Section 22300, upon Contractor’s
request, City will make payment to Contractor of any funds withheld from payments to ensure
performance under the Contract Documents if Contractor deposits with City, or in escrow with a
California or federally chartered bank in California acceptable to City (“Escrow Agent”), securities
eligible for the investment of State Funds under Government Code Section 16430, or bank or savings
and loan certificates of deposit, interest-bearing demand deposit accounts, standby letters of credit, or
any other security mutually agreed to by the Contractor and the City, upon the following conditions:
1. Contractor shall be the beneficial owner or any securities substituted for monies withheld for the
purpose of receiving any interest thereon.
2. All expenses relating to the substitution of securities under Public Contract Code Section 22300
and under this Paragraph 7.04, including, but not limited to City’s overhead and administrative
expenses, and expenses of Escrow Agent shall be the responsibility of Contractor.
3. Securities or certificates of deposit substituted for monies withheld shall be of a value of at least
equivalent to the amounts of retention to be paid to Contractor pursuant to the Contract
Documents.
4. If Contractor chooses to deposit securities in lieu of monies withheld with an Escrow Agent,
Contractor, City and Escrow Agent shall, as a prerequisite to such deposit, enter into an escrow
agreement, using the City’s form, “Escrow Agreement for Deposit of Securities in Lieu of
Retention.”
5. Contactor shall obtain the written consent of Surety to such agreement.
6. Securities, if any, shall be returned to Contractor only upon satisfactory Final Completion of the
Work.
B.Substitute Security
To minimize the expense caused by such substitution of securities, Contractor shall, prior to or at the
time Contractor requests to substitute security, deposit sufficient security to cover the entire amount to
be withheld. Should the current market value of such substituted security fall below the amount for
which it was substituted, or any other amounts which the City withholds pursuant to the Contract
Documents, Contractor shall immediately and at Contractor’s expense and at no cost to City deposit
additional security qualifying under Public Contract Code Section 22300 until the current market value
of the total security deposited is no less than the amount subject to withholding under the Contract
Page 57 of 120
.
.
Item 8 Page 60 of 221
Documents. Securities shall be valued as often as conditions of the securities market warrant, but in
no case less frequently than once per month.
C.Deposit of Retentions
Alternatively, subject to the conditions set forth in Paragraph 7.04-A above, upon request of
Contractor, City shall make payment of retentions directly to Escrow Agent at the expense of
Contractor, provided that Contractor, City and Escrow Agent shall, as a prerequisite such payment,
enter into an escrow agreement in the same form as prescribed in Part 4 of Paragraph A, above. At
the expense of Contractor and at no cost to City, Contractor may direct the investment of the
payments into securities and interest bearing accounts, and Contractor shall receive the interest
earned on the investments. Escrow Agent shall hold such direct payments by City under the same
terms provided herein for securities deposited by Contractor. Upon satisfactory Final Completion of
the Work, Contractor shall receive from Escrow Agent all securities, interest and payments received
by Escrow Agent from City, less escrow fees and charges of the Escrow Account, according to the
terms of Public Contract Code Section 22300 and the Contract Documents.
D.Time for Election of Substitution of Securities
Notwithstanding the provision of 7.04 A, B, and C above and California Public Contract Code Section
22300, the failure of Contractor to request the Substitution of eligible securities for monies to be withheld
by City within ten (10) days of the award of Contract to Contractor shall be deemed to be a waiver of
all such rights.
7.10 CLAIMS
A.Arising of Claim.
1. Scope Change. When Contractor has a claim for an increase in the Contract Sum or Contract
Time due to a scope change which has not yet become final, a “claim” will be deemed to arise
once the Director has issued a decision denying, in whole or in part, the Contractor’s Change
Order Request.
2. Other Claims. In the case of a Claim by Contractor that does not involve an adjustment to the
Contract Sum or Contract Time due to a scope change and which has not become final, the
Claim may be asserted if, and only if, Contractor gives written notice to City of intent to file the
Claim within three (3) days of the date of discovery relative to such circumstances (even if
Contractor has not yet been damaged or delayed). Such written notice of intent to file a Claim
shall be valid if, and only if, it identifies the event or condition giving rise to the Claim, states its
probable effect, if any with respect to Contractor's entitlement to an adjustment of the Contract
Sum or Contract Time and complies with the requirements of Paragraph 7.11-B, below. For
purposes of this Paragraph 7.11, a Claim for which such written notice is required and has been
given by Contractor shall be deemed to arise on the date that such written notice is received by
City.
B.Content of Claim
A Claim by Contractor must include all of the following:
1. A statement that it is a Claim and a request for a decision on the Claim;
Page 58 of 120
.
.
Item 8 Page 61 of 221
2. A detailed description of the act, error, omission, unforeseen condition, event or other
circumstance giving rise to the Claim.
3. If the Claim involves an adjustment to the Contract Sum or Contract Time due to a change in
scope, a statement demonstrating that all requisite notices were provided, including, without
limitation, timely written notice and a Change Order Request as required by Article 6 of these
General Conditions and timely notice of delay and request for extension of time in accordance
with Article 3. If the Claim does not involve an adjustment to the Contract Sum or Contract Time
due to a change in scope, a statement demonstrating that a notice of intent to file the Claim was
timely submitted as required by Paragraph 7.10-A.2, above;
4. A detailed justification for any remedy or relief sought by the Claim including without limitation,
a detailed cost breakdown in the form required for submittal of Change Order Requests and
actual job cost records demonstrating that the costs have been incurred;
5. If the Claim involves a request for adjustment of the Contract Time, written documentation
demonstrating that Contractor has complied with the requirements of the Contract Documents
and written substantiation (including, without limitation, a Time Impact Analysis) demonstrating
that Contractor is entitled to an extension of time under the Contract Documents; and
6. A written certification signed by a managing officer of Contractor's organization, who has the
authority to sign contracts and purchase orders on behalf of Contractor and who has personally
investigated and confirmed the truth and accuracy of the matters set forth in such certification,
in the 'following form:
"I hereby certify under penalty of perjury that I am a managing officer of (Contractor's name) and
that I have reviewed the Claim presented herewith on Contractor's behalf and/or on behalf of
(Subcontractor's name) and that, to the best of my knowledge after conducting a diligent inquiry
into the facts of the Claim, the following statements are true and correct:
The facts alleged in or that form the basis for the Claim are, to the best of my knowledge
following diligent inquiry, true and accurate; and,
(a)I do not know of any facts or circumstances, not alleged in the Claim, that by
reason of their not being alleged render any fact or statement alleged in the Claim
materially misleading; and,
(b)I have, with respect to any request for money or damages alleged in or that forms
the basis for the Claim, reviewed the job cost records (including those maintained
by Contractor and by any Subcontractor, of any tier, that is asserting all or any
portion of the Claim) and confirmed with reasonable certainty that the losses or
damages suffered by Contractor and/or such Subcontractor were in fact suffered
in the amounts and for the reasons alleged in the Claim; and,
(c)I have, with respect to any request for extension of time or claim of delay,
disruption, hindrance or interference alleged in or that forms the basis for the
Claim, reviewed the job schedules (including those maintained by Contractor and
the Subcontractor, of any tier, that is asserting all or any portion of the Claim) and
confirmed on an event-by-event basis that the delays or disruption suffered by
Contractor and/or such Subcontractor were in fact experienced for the durations,
in the manner, and with the consequent effects on the time and/or sequence of
Page 59 of 120
.
.
Item 8 Page 62 of 221
.
.
Item 8 Page 63 of 221
.
.
Item 8 Page 64 of 221
3. Meet and Confer. If Contractor disputes City's response, or if City fails to respond within the
prescribed time set forth in Paragraph 7.10-E.1 and 7.10-E.2, above, Contractor may so notify
City, in writing, within fifteen (15) days of City's response, or within fifteen (15) days of City’s
response due date in the event of a failure to respond, and demand an informal conference to
meet and confer for settlement of the issues in dispute. Upon such demand, City shall schedule
a meet and confer conference within thirty (30) days of such demand, for discussion of
settlement of the dispute.
F.Finality of Decision
If Contractor disputes the Director’s decision under this Article, it shall commence the Dispute
Resolution Process as set forth in Article 15 of these General Conditions by filing a Statement of
Dispute within seven (7) days after receipt of the Director’s response.
G.Continuing Contract Performance/Duty to Proceed with Disputed Work
Contractor shall not delay or postpone any Work pending resolution of any claims, disputes or
disagreements. Pending final resolution of a claim, the Contactor shall proceed diligently with
performance of the Contract and the City shall continue to make payments for undisputed Work in
accordance with the Contract Documents. In the event of disputed Work, City shall have the right to
unilaterally issue a Work Directive and Contractor shall continue performance pending resolution of the
dispute and shall maintain the accounting and cost data to substantiate the cost of such disputed work.
[END OF ARTICLE]
Page 61 of 120
.
.
Item 8 Page 65 of 221
ARTICLE 8 - MATERIALS AND EQUIPMENT
8.01 GENERAL
A.The Contractor shall furnish all materials and equipment needed to complete the Work and installations
required under the terms of this Contract, except those materials and equipment specified to be
furnished by the City.
B.The Contractor shall submit satisfactory evidence that the materials and equipment to be furnished and
used in the work are in compliance with the Specifications. Materials and equipment incorporated in
the Work and not specifically covered in the Specifications shall be the best of their kind. Unless
otherwise specified, all materials and equipment incorporated in the Work under the Contract shall be
new.
8.02 QUALITY AND WORKMANSHIP
All material and equipment furnished by the Contractor shall be new, high grade, and free from defects and
imperfections, unless otherwise hereinafter specified. Workmanship shall be in accordance with the best
standard practices. All materials and equipment must be of the specified quality and equal to approved samples,
if samples have been required. All Work shall be done and completed in a thorough, workmanlike manner,
notwithstanding any omission from the Specifications or Drawings, and it shall be the duty of the Contractor to
call attention to apparent errors or omissions and request instructions before proceeding with the Work. The
Director may, by appropriate instructions, correct errors and supply omissions, which instructions shall be binding
upon the Contractor as though contained in the original Specifications or Drawings. All Work performed under
the Specifications will be inspected by the Director as provided in Paragraph 8.04. All materials and equipment
furnished and all Work done must be satisfactory to the Director. Work, material, or equipment not in accordance
with the Specifications, in the opinion of the Director shall be made to conform thereto. Unsatisfactory materials
and equipment will be rejected, and if so ordered by the Director, shall, at the Contractor's expense, be
immediately removed from the vicinity of the Work.
8.03
8.04
TRADE NAMES AND "OR APPROVED EQUAL" PROVISION
Whenever in the Specifications or Drawings the name or brand of a manufactured article is used it is intended
to indicate a measure of quality and utility or a standard. Except in those instances where the product is
designated to match others in use on a particular improvement either completed or in the course of completion,
the Contractor may substitute any other brand or manufacture of equal appearance, quality, and utility on
approval of the Director, provided the use of such brand or manufacture involves no additional cost to the City.
APPROVAL OF MATERIALS
A.The Contractor shall furnish without additional cost to the City such quantities of construction materials
as may be required by the Director for test purposes. He/she shall place at the Director's disposal all
available facilities for and cooperate with him in the sampling and testing of all materials and
workmanship. The Contractor shall prepay all shipping charges on samples. No samples are to be
submitted with the bids unless otherwise specified.
B.Each sample submitted shall be labeled. A letter, in duplicate, submitting each shipment of samples
shall be mailed to the Director by the Contractor. Both the label on the sample and the letter of
transmittal shall indicate the material represented, its place of origin, the names of the producer and
the Contractor, the Specifications number and title, and a reference to the applicable Drawings and
Specifications paragraphs.
Page 62 of 120
.
.
Item 8 Page 66 of 221
C.
D.
Materials or equipment of which samples are required shall not be used on the Work until approval has
been given by the Director in writing. Approval of any sample shall be only for the characteristics of the
uses named in such approval and no other. No approval of a sample shall be taken in itself to change
or modify any Contract requirement.
Failure of any material to pass the specified tests, including life cycle maintenance data may be
sufficient cause for refusal to consider under this Contract, any further sample of the same brand or
make of that material.
8.05 ORDERING MATERIALS AND EQUIPMENT
One copy of each of the Contractor's purchase orders for materials and equipment forming a portion of the Work
must be furnished to the Director, if requested. Each such purchase order shall contain a statement that the
materials and equipment included in the order are subject to inspection by the City. Materials and equipment
purchased locally will, at the City’s discretion, be inspected at the point of manufacture or supply, and materials
and equipment supplied from points outside the Los Angeles area will be inspected upon arrival at the job, except
when other inspection requirements are provided for specific materials in other sections of the Contract
Documents.
8.06 AUTHORITY OF THE DIRECTOR
A.
B.
On all questions concerning the acceptability of materials or machinery, the classification of materials,
the execution of the Work, and conflicting interests of Contractors performing related work, the decision
of the Director shall be final and binding.
The Director will make periodic observations of materials and completed work to observe their
compliance with Drawings, Specifications, and design and planning concepts, but he/she is not
responsible for the superintendence of construction processes, site conditions, operations, equipment,
personnel, or the maintenance of a safe place to work or any safety in, on, or about the site of work.
8.07 INSPECTION
All materials furnished and work done under this Contract will be subject to rigid inspection. The Contractor shall
furnish, without extra charge, the necessary test pieces and samples, including facilities and labor for obtaining
them, as requested by the Director. The Director, or his/her authorized agent or agents, at all times shall have
access to all parts of the shop and the works where such materials under his/her inspection is being
manufactured or the work performed. Work or material that does not conform to the Specifications, although
accepted through oversight, may be rejected at any stage of the Work. Whenever the Contractor is permitted or
directed to do night work or to vary the period during which work is carried on each day, he/she shall give the
Director due notice, so that inspection may be provided. Such work shall be done under regulations to be
furnished in writing by the Director.
8.08 INFRINGEMENT OF PATENTS
The Contractor shall hold and save the City, its officers, agents, servants, and employees harmless from and
against all and every demand or demands, of any nature or kind, for or on account of the use of any patented
invention, process, equipment, article, or appliance employed in the execution of the Work or included in the
materials or supplies agreed to be furnished under this Contract, and should the Contractor, his/her agents,
servants, or employees, or any of them, be enjoined from furnishing or using any invention, process, equipment,
article, materials, supplies or appliance supplied or required to be supplied or used under this Contract, the
Contractor shall promptly substitute other inventions, processes, equipment, articles, materials, supplies, or
Page 63 of 120
.
.
Item 8 Page 67 of 221
appliances in lieu thereof, of equal efficiency, quality, finish, suitability, and market value, and satisfactory in all
respects to the Director. Or in the event that the Director elects, in lieu of such substitution, to have, supplied,
and to retain and use, any such invention, process, equipment, article, materials, supplies, or appliances, as may
by this Contract be required to be supplied and used, in that event the Contractor shall at his/her expense pay
such royalties and secure such valid licenses as may be requisite and necessary to enable the City, its officers,
agents, servants, and employees, or any of them, to use such invention, process, equipment, article, materials,
supplies, or appliances without being disturbed or in way interfered with by any proceeding in law or equity on
account thereof. Should the Contractor neglect or refuse promptly to make the substitution hereinbefore required,
or to pay such royalties and secure such licenses as may be necessary and requisite for the purpose aforesaid,
then in that event the Director shall have the right to make such substitution, or the City may pay such royalties
and secure such licenses and charge the cost thereof against any money due the Contractor from the City, or
recover the amount thereof from him/her and his/her surety, notwithstanding final payment under this Contract
may have been made.
[END OF ARTICLE]
Page 64 of 120
.
.
Item 8 Page 68 of 221
ARTICLE 9 – SUBMITTALS
9.01 GENERAL
A.The Contractor shall submit samples, drawings, and data for the Director's approval which demonstrate
fully that the construction, and the materials and equipment to be furnished will comply with the
provisions and intent of the Drawings and Specifications.
B.Specific items to be covered by the submittals shall include, as a minimum, the following:
1.
2.
3.
For structures, submit all shop, setting, equipment, miscellaneous iron and reinforcement
drawings and schedules necessary.
For conduits, submit a detailed layout of the conduit with details of bends and fabricated
specials and furnish any other details necessary. Show location of shop and field welds.
For equipment which requires electrical service, submit detailed information to show power
supply requirements, wiring diagrams, control and protection schematics, shop test data,
operation and maintenance procedures, outline drawings, and manufacturer's
recommendation of the interface/interlock among the equipment.
4.For mechanical equipment submit all data pertinent to the installation and maintenance of
the equipment including shop drawings, manufacturer's recommended installation
procedure, detailed installation drawings, test data and curves, maintenance manuals, and
other details necessary.
5.Samples
6.Colors
7.Substitutions
8.Manuals
9.As-built drawings
Safety plans required by Article 1010.
9.02
9.03
PRODUCT HANDLING
A.Submittals shall be accompanied by a letter of transmittal and shall be in strict accordance with the
provisions of this Article.
B.Submit priority of processing when appropriate.
SCHEDULE OF SUBMITTALS
A.The Contractor shall prepare and submit a schedule of submittals. The schedule of submittals shall be
in the form of a submittal log. Refer to Paragraph 9.12.
Page 65 of 120
.
.
Item 8 Page 69 of 221
9.04 SHOP DRAWINGS
A.
B.
C.
All shop drawings shall be produced to a scale sufficiently large to show all pertinent features of the
item and its method of connection to the Work.
All shop drawing prints shall be made in blue or black line on white background. Reproductions of
City/Contract Drawings are not acceptable.
The overall dimensions of each drawing submitted to the Director shall be equal to one of the City's
standard sheet sizes as listed below. The title block shall be located in the lower right hand corner of
each drawing and shall be clear of all line Work, dimensions, details, and notes.
Sheet Sizes
Height X Width
11" X 8 1/2"
11" X 17"
24" X 36"
30” X 42”
9.05 COLORS
Unless the precise color and pattern are specified elsewhere, submit accurate color charts and pattern charts to
the Director for his/her review and selection whenever a choice of color or pattern is available in a specified
product. Label each chart naming the source, the proposed location of use on the project, and the project.
9.06
9.07
MANUFACTURERS' LITERATURE
Where contents of submitted literature from manufacturers includes data not pertinent to the submittal, clearly
show which portions of the contents are being submitted for review.
SUBSTITUTIONS
A.The Contract is based on the materials, equipment, and methods described in the Contract Documents.
Any Contractor proposed substitutions are subject to the Director’s approval.
The Director will consider proposals for substitution of materials, equipment, and methods only when
such proposals are accompanied by full and complete technical data, and all other information,
including life cycle maintenance data, required by the Director to evaluate the proposed substitution.
B.
C.
Any requests for substitutions by the Contractor must be made within forty-five (45) calendar days from
the Issuance Date on the Notice to Proceed. Otherwise, such requests will not be considered.
Trade names and "or approved equal" provision as set forth in Paragraph 8.03.
9.08 MANUALS
A. When manuals are required to be submitted covering items included in this Work, prepare and submit
such manuals in approximately 8-1/2" X 11" format in durable plastic binders. In addition, manuals
shall be submitted in electronic format. Manuals shall contain at least the following:
1.Identification on, or readable through, the front cover stating general nature of the manual.
Page 66 of 120
.
.
Item 8 Page 70 of 221
2.Neatly typewritten index near the front of the manual, furnishing immediate information as to
location in the manual of all emergency data regarding the installation.
3.
4.
Complete instructions regarding operation and maintenance of all equipment involved.
Complete nomenclature of all replaceable parts, their part numbers, current cost, and name
and address of nearest vendor of parts.
5.
6.
Copy of all guarantees and warranties issued.
Copy of drawings with all data concerning changes made during construction.
B.Where contents of manuals include manufacturers' catalog pages, clearly indicate the precise items
included in this installation and delete, or otherwise clearly indicate, all manufacturers' data with which
this installation is not concerned.
9.09 AS-BUILT DRAWINGS
A.When required to be submitted covering items included in this Work, the Contractor shall deliver to the
City one complete set of final As-Built hard copy drawings together with a set of AutoCAD drawing files
in electronic format showing completed building, “as-built” for City records before the Contract will be
accepted by the City.
B.
C.
The drawings shall be duplicates and at the same size and dimensional scale as the originals. They
shall be on a polyester translucent base material with a minimum sheet thickness of .003 inch (.08mm).
The legibility and contrast of each drawing submitted to the City shall be such that every line, number,
letter, and character is clearly readable in a full size blow back from a 35 mm microfilm negative of the
drawing.
9.10
9.11
SUBMITTALS QUANTITIES
A.Submit one (1) copy via email to lmelendez@cityofvernon.org of all data and drawings unless specified
otherwise.
B.Submit all samples, unless specified otherwise, in the quantity to be returned, plus two, which will be
retained by the Director.
IDENTIFICATION OF SUBMITTALS
Completely identify each submittal and re-submittal by showing at least the following information:
A.Name and address of submitter, plus name and telephone number of the individual who may be
contacted for further information.
B.
C.
Name of project as it appears in the Contract Documents and Specification No.
Drawing number and Specifications section number other than this section to which the submittal
applies.
D.Whether this is an original submittal or re-submittal.
Page 67 of 120
.
.
Item 8 Page 71 of 221
E.For samples, indicate the source of the sample.
9.12 SCHEDULE OF SUBMITTALS
A.
B.
C.
Submit initial schedule of submittals within five (5) Working Days after the Issuance Date on Notice to
Proceed.
Submit revised schedule of submittals within five (5) Working Days after date of request from the
Director.
The Director will review schedule of submittals and will notify Contractor that schedule is acceptable
or not acceptable within five (5) Working Days after receipt.
9.13 COORDINATION OF SUBMITTALS
A. Prior to submittal for the Director’s review, use all means necessary to fully coordinate all material,
including the following procedures:
1. Determine and verify all field dimensions and conditions, materials, catalog numbers, and similar
data.
2. Coordinate as required with all trades and with all public agencies involved.
3. Secure all necessary approvals from public agencies and others and signify by stamp, or other
means, that they have been secured.
4. Clearly indicate all deviations from the Specifications.
B.Unless otherwise specifically permitted by the Director, make all submittals in groups containing all
associated items; the Director may reject partial submittals as not complying with the provisions of the
Specifications.
9.14 TIMING FOR SUBMITTALS
A.Make all submittals far enough in advance of scheduled dates of installation to provide all required time
for reviews, for securing necessary approvals, for possible revision and re-submittal, and for placing
orders and securing delivery.
B.
C.
In scheduling, allow at least 15 Working Days for the Director’s review, plus the transit time to and from
the City office.
Manuals shall be submitted prior to performing functional tests.
9.15 APPROVAL BY CITY
A.Each submittal, except manuals, schedule of costs for progress payments, and as-built drawings will
be returned to the Contractor marked "No Exceptions Taken," “Make Corrections Noted - Do Not
Resubmit,” or “Make Corrections Noted - Resubmit.” Manuals, schedule of costs, and as-built drawings
will be returned to Contractor via email for re-submittal if incomplete or unacceptable.
B.Submittals marked "Approved as Noted" need not be resubmitted, but the notes shall be followed.
Page 68 of 120
.
.
Item 8 Page 72 of 221
C.
D.
If submittal is returned for correction, it will be marked to indicate what is unsatisfactory.
Resubmit one (1) original hard copy and one (1) electronic copy (via email to
lmelendez@cityofvernon.org) of the revised drawings or data as indicated.
E.Approval of each submittal by the Director will be general only and shall not be construed as:
1. Permitting any departures from the Specifications requirements.
2. Relieving the Contractor of the responsibility for any errors and omissions in details, dimensions,
or of other nature that may exist.
3. Approving departures from additional details or instructions previously furnished by the Director.
9.16 CHANGES TO APPROVED SUBMITTALS
A.A re-submittal is required for any proposed change to an approved submittal. Changes which require
re-submittal include, but are not necessarily limited to, drawing revisions, changes in materials and
equipment, installation procedures and test data. All re-submittals shall include an explanation of the
necessity for the change.
B.Minor corrections to an approved submittal may be accomplished by submitting a "Corrected Copy".
[END OF ARTICLE]
Page 69 of 120
.
.
Item 8 Page 73 of 221
ARTICLE 10 – SAFETY
10.01 PROTECTION OF PERSONS AND PROPERTY
A.Contractor's Responsibility: Notwithstanding any other provision of the Contract Documents, the
Contractor shall be solely and completely responsible for conditions of the job site, including safety of
all persons and property, during performance of the Work. This requirement will apply continuously and
will not be limited to normal working hours. Safety and sanitary provisions shall conform to all applicable
Federal, State, County, and local laws, regulations, ordinances, standards, and codes. Where any of
these are in conflict, the more stringent requirement shall be followed.
B.
C.
Sanitary Facilities. The Contractor shall furnish and maintain sanitary facilities by the worksites for the
entire construction period.
Protection of the Public. The Contractor shall take such steps and precautions as his/her operations
warrant to protect the public from danger, loss of life, loss of property or interruption of public services.
Unforeseen conditions may arise which will require that immediate provisions be made to protect the
public from danger or loss, or damage to life and property, due directly or indirectly to prosecution of
work under this contract. Whenever, in the opinion of the Director, a condition exists which the
Contractor has not taken sufficient precaution of public safety, protection of utilities and/or protection of
adjacent structures or property, the Director will order the Contractor to provide a remedy for the
condition. If the Contractor fails to act on the situation within a reasonable time period as determined
by the Director, or in the event of an emergency situation, the Director may provide suitable protection
by causing such work to be done and material to be furnished as, in the opinion of the Director, may
seem reasonable and necessary. The cost and expense of all repairs (including labor and materials)
as are deemed necessary, shall be borne by the Contractor. All expenses incurred by the City for
emergency repairs will be deducted from the final payment due to the Contractor.
10.02 PROTECTION FROM HAZARDS
A.Trench Excavation
Excavation for any trench four (4) feet or more in depth shall not begin until the Contractor has received
approval from the Director of the Contractor's detailed plan for worker protection from the hazards of
caving ground during the excavation of such trench. Such plan shall show the details of the design of
shoring, bracing, sloping or other provisions to be made for worker protection during such excavation.
No such plan shall allow the use of shoring, sloping or protective system less effective than that required
by the Construction Safety Orders of the Division of Occupational Safety and Health, and if such plan
varies from the shoring system standards established by the Construction Safety Orders, the plan shall
be prepared and signed by an engineer who is registered as a Civil or Structural Director in the State
of California.
B.Confined Spaces
Contractor shall comply with all of the provisions of General Industry Safety Orders of the California
Code of Regulations. Entry of a confined space shall not be allowed until the Contractor has received
approval from the Director of the Contractor’s program for confined space entry. Confined space means
a space that (1) Is large enough and so configured that an employee can bodily enter and perform
assigned Work; and (2) Has limited or restricted means for entry or exit (for example, tanks, vessels,
silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry); and (3)
Is not designed for continuous employee occupancy. Failure to submit a confined space entry program
Page 70 of 120
.
.
Item 8 Page 74 of 221
may result in actions as provided in Article 5: “Suspension or Termination of Contract.”
Material Safety Data SheetC.
Contractor shall comply with all of the provisions of General Industry Safety Orders of the California
Administrative Code. The Contractor shall submit to the Director a Material Safety Data Sheet (MSDS)
for each hazardous substance proposed to be used, ten (10) days prior to the delivery of such materials
to the job site or use of such materials at a manufacturing plant where the Director is to perform an
inspection. For materials which are to be tested in City laboratories, the MSDS shall be submitted with
the sample(s). Hazardous substance is defined as any substance included in the list (Director's List)
of hazardous substances prepared by the Director, California Department of Industrial Relations,
pursuant to Labor Code Section 6382. Failure to submit an MSDS for any hazardous substance may
result in actions as provided in Article 5, "Suspension or Termination of Contract".
10.03 DIFFERING SITE CONDITIONS
A.Differing Site Conditions Defined. The Contractor shall promptly, and before such conditions are
disturbed, notify the Director in writing of any Differing Site Conditions. Differing Site Conditions are
those conditions, located at the project site or in existing improvements and not otherwise ascertainable
by Contractor through the exercise of due diligence in the performance of its inspection obligations in
the Contract Documents, encountered by Contractor in digging trenches or other excavations(s) that
extend deeper than four feet below the surface of the ground that constitute:
1. Material that the Contractor believes may be material that is hazardous waste as defined in Section
25117 of the Health and Safety Code, which is required to be removed to a Class I, Class II, or
Class III disposal site in accordance with provisions of existing law.
2. Subsurface or latent physical conditions at the site differing materially from those indicated in these
Contract Documents.
3. Unknown physical conditions at the site, of any unusual nature, different materially from those
ordinarily encountered and generally recognized as inherent in Work of the character provided for
in these Contract Documents.
B.
C.
D.
Notice by Contractor. If the Contractor encounters conditions it believes constitute Differing Site
Conditions, then notice of such conditions shall, before such conditions are disturbed, be promptly
reported to the Director followed within twenty-four (24) hours by a further written notice stating a
detailed description of the conditions encountered.
The Director will promptly investigate the conditions and If he/she finds that such conditions do
materially differ, or do involve hazardous waste, and do cause an increase or decrease in the
Contractor's cost of, or time required for, performance of any part of the Work under this Contract, an
equitable adjustment will be made, as determined by the Director.
Change Order Request. If Contractor intends to seek an adjustment to the Contract Sum or Contract
Time based upon Differing Site Conditions, it must, within ten (10) Days after the Discovery Date relative
to such conditions, submit a Change Order Request setting forth a detailed cost breakdown and Time
Impact Analysis, in the form required by Article 6 of these General Conditions, of the additional
Allowable Costs and Excusable Delay resulting from such Differing Site Conditions.
E.Failure to Comply. Failure by Contractor to strictly comply with the requirements of this Paragraph
Page 71 of 120
.
.
Item 8 Page 75 of 221
10.03 concerning the timing and content of any notice of Differing Site Conditions or request for
adjustment in Contract Sum or Contract Time based on Differing Site Conditions shall be deemed
waiver of any right by the Contractor for an adjustment in the Contract Sum or Contract Time by reason
of such conditions.
F.Final Completion. No claim by the Contractor for additional compensation for Differing Site Conditions
shall be allowed if asserted after Final Payment.
G.In the event of disagreement between the Contractor and the Director whether the conditions do
materially differ or whether a hazardous waste is involved or whether the conditions cause an increase
or decrease in the Contractor's cost of, or time required for, performance of any part of the Work, the
Contractor shall not be excused from any completion date required by the Contract, but shall proceed
with all Work to be performed under the Contract Documents.
H.
I.
The Contractor shall retain all rights provided by, and shall be subject to all requirements of, this
Contract which pertain to the resolution of disputes and protests.
Contractor Responsibility. Except as otherwise provided in this Paragraph 10.03 for Differing Site
Conditions, Contractor agrees to solely bear the risk of additional cost and Delay due to concealed or
unknown conditions, surface or subsurface, at the Site or in Existing Improvements, without adjustment
to the Contract Sum or Contract Time.
10.04 TRAFFIC REGULATION
A.During the performance of the Work the Contractor shall erect and maintain necessary temporary
fences, bridges, railings, lights, signals, barriers, or other safeguards as shall be appropriate under the
circumstance in his/her judgment for the prevention of accidents; and he/she shall take other
precautions as necessary for public safety including, but not limited to, traffic control. Traffic control
shall be conducted in accordance with the latest edition of the California Manual on Uniform Traffic
Control Devices (MUTCD), published by BNi Books, and as directed and approved by the City
Engineer.
B.
C.
Contractor shall submit at least ten (10) Working Days prior to Work a detailed traffic control plan, that
is approved by all agencies having jurisdiction and that conforms to all requirements of the
Specifications.
No changes or deviations from the approved detailed traffic control plan shall be made, except
temporary changes in emergency situations, without prior approval of the City Engineer and all
agencies having jurisdiction.
Contractor shall immediately notify the Director, the City Engineer and the agencies having jurisdiction
of occurrences that necessitate modification of the approved traffic control plan.
D.Contractor’s failure to comply with this provision may result in actions as provided in Article 5:
“Suspension or Termination of Contract” of these General Conditions.
10.05 TRAFFIC CONTROL DEVICES
A. Traffic signs, flashing lights, barricades and other traffic safety devices used to control traffic shall
conform to the requirements of the California Manual on Uniform Traffic Control Devices (MUTCD)
Page 72 of 120
.
.
Item 8 Page 76 of 221
and as approved by the City Engineer.
1. Portable signals shall not be used unless permission is given in writing by the agency having
jurisdiction.
2. Warning signs used for nighttime conditions shall be reflectorized or illuminated. "Reflectorized
signs" shall have a reflectorized background and shall conform to the current State of California
Department of Transportation specification for reflective sheeting on highway signs.
B.If the Contractor fails to provide and install any of the signs or traffic control devices required herby or
ordered by the City staff, staff may cause such signs or traffic control devices to be placed by others,
charge the costs therefore against the Contractor, and deduct the same from the next progress
payment.
10.06 EXECUTION
A.
B.
C.
D.
The Contractor shall provide written notification to the Police Department, Traffic Bureau (323) 587-
5171, at least two (2) weeks prior to the beginning of construction at any particular location. Notification
will include the specific location, project dates, what lanes of the roadway will be closed and when. Also
the construction project manager’s name and business phone number and the construction inspector’s
name and business phone number.
The Contractor shall notify, by telephone, the Police Department, (323) 587-5171 at the completion of
any posting of temporary no parking signs. Notification will include the times, dates and locations of
the posting. When vehicles must be towed for violation of temporary no parking signs, the person who
actually posted the signs, or on-view supervisor of that posting, will be present to answer pertinent
questions that may be asked by the parking enforcement officer or police officer towing the vehicles.
The Contractor shall notify the Fire Department, on a daily basis during the entire period that
construction is in progress whenever roadways are reduced in width or blocked. Notification shall be
made to the Fire Dispatch (323) 881-6183 and the Contractor shall provide the information required to
identify which roadways would have accessibility problems due to his/her operations. The Contractor
shall submit to Fire Department schedule of Work for their use and files.
Roads subject to interference from the Work covered by this Contract shall be kept open, and the
fences subject to interference shall be kept up by the Contractor until the Work is finished. Except
where public roads have been approved for closure, traffic shall be permitted to pass through
designated traffic lanes with as little inconvenience and delay as possible.
E.
F.
G.
Where alternating one-way traffic has been authorized, the maximum time that traffic will be delayed
shall be posted at each end of the one-way traffic section. The maximum delay time shall be approved
by the agency having jurisdiction.
Contractor shall install temporary traffic markings where required to direct the flow of traffic and shall
maintain the traffic markings for the duration of need. Contractor shall remove the markings by abrasive
blasting when no longer required.
Convenient access to driveways and buildings in the vicinity of Work shall be maintained as much as
possible. Temporary approaches to, and crossing of, intersecting traffic lanes shall be provided and
Page 73 of 120
.
.
Item 8 Page 77 of 221
kept in good condition.
H.When leaving a Work area and entering a roadway carrying public traffic, the Contractor's equipment,
whether empty or loaded, shall in all cases yield to public traffic.
10.07 FLAGGING
A. Contractor shall provide flaggers to control traffic where required by the approved traffic control plan.
1. Flaggers shall perform their duties and shall be provided with the necessary equipment in
accordance with the current "Instructions to Flaggers" of the State of California Department of
Transportation.
2. Flaggers shall be employed full time on traffic control and shall have no other duties.
10.08 PEDESTRIAN CANOPIES OR BARRICADE IMPROVEMENTS
Refer to City of Vernon for requirements for building or access road safety improvements that the Contractor
shall construct during construction period. These devices or improvements, as the City deems necessary or
prudent, shall be at the expense of the Contractor.
[END OF ARTICLE]
Page 74 of 120
.
.
Item 8 Page 78 of 221
ARTICLE 11 - INDEMNITY
11.01 INDEMNITY
To the maximum extent permitted by law, the Contractor shall fully indemnify, hold harmless, protect, and defend
the City, its officers, employees, agents, representatives and their successors and assigns (“Indemnitees”) from
and against any and all demands, liability, loss, suit, claim, action, cause of action, damage, cost, judgment,
settlement, decree, arbitration award, stop notice, penalty, loss of revenue, and expense (including any fees of
accountants, attorneys, experts or other professionals, and costs of investigation, mediation, arbitration, litigation
and appeal), in law or in equity, of every kind and nature whatsoever, arising out of or in connection with, resulting
from or related to, or claimed to be arising out of the Work performed by Contractor, or any of its officers, agents,
employees, Subcontractors, Sub-Subcontractors, design consultants or any person for whose acts any of them
may be liable, regardless of whether such claim, suit or demand is caused, or alleged to be caused, in part, by
an Indemnitee, including but not limited to:
A.
B.
Bodily injury, emotional injury, sickness or disease, or death to any persons;
Infringement of any patent rights, licenses, copyrights or intellectual property which may be brought
against the Contractor or City arising out of Contractor’s Work, for which the Contractor is responsible;
C.Stop notices and claims for labor performed or materials used or furnished to be used in the Work,
including all incidental or consequential damages resulting to City from such stop notices and claims;
D.
E.
F.
Failure of Contractor or its Subcontractors to comply with the provisions for insurance;
Failure to comply with any Governmental Approval or similar authorization or order;
Misrepresentation, misstatement, or omission with respect to any statement made in or any document
furnished by the Contractor in connection therewith;
G.
H.
I.
Breach of any duty, obligation, or requirement under the Contract Documents;
Failure to provide notice to any Party as required under the Contract Documents;
Failure to protect the property of any utility provider or adjacent property owner; or
Failure to make payment of all employee benefits.J.
This indemnity provision is effective regardless of any prior, concurrent, or subsequent active or passive
negligence by Indemnitees, except that, to the limited extent mandated by California Civil Code Section 2782,
the Contractor shall not be responsible for liabilities which arise from the sole negligence or willful misconduct of
Indemnitees or arise from the active negligence of City.
11.02 ENFORCEMENT
Contractor’s obligations under this Article extend to claims occurring after termination of the Contractor’s
performance of the Contract or Final Payment to Contractor. The obligations apply regardless of any actual or
alleged negligent act or omission of Indemnitees. Contractor, however, shall not be obligated under this
Agreement to indemnify an Indemnitee for claims arising from the sole active negligence or willful misconduct of
the Indemnitee or independent contractors who are directly responsible to Indemnitees. Contractor’s obligations
under this Article are in addition to any other rights or remedies which the Indemnitees may have under the law
Page 75 of 120
.
.
Item 8 Page 79 of 221
or under the Contract Documents. In the event of any claim, suit or demand made against any Indemnitees, the
City may in its sole discretion reserve, retain or apply any monies due to the Contractor under the Contract for
the purpose of resolving such claims; provided, however, that the City may release such funds if the Contractor
provides the City with reasonable assurance of protection of the City’s interests. The City shall in its sole
discretion determine whether such assurances are reasonable.
11.03 NO LIMITATIONS
Contractor’s indemnification and defense obligations set forth in this Article are separate and independent from
the insurance provisions set forth in Article 12 herein; and do not limit, in any way, the applicability, scope, or
obligations set forth in those insurance provisions. In claims, suits, or demands against any Indemnitee by an
employee of the Contractor, a Subcontractor, anyone directly or indirectly employed by them, or anyone for
whose acts they may be liable, the Contractor’s indemnification and defense obligations shall not be limited by
a limitation on amount or type of damages, compensation, or benefits payable by or for the Contractor or a
Subcontractor under workers’ compensation acts, disability benefits acts, or other employee benefits acts.
[END OF ARTICLE]
Page 76 of 120
.
.
Item 8 Page 80 of 221
ARTICLE 12 – INSURANCE
12.01 CONDITION TO COMMENCEMENT
Contractor shall not commence Work under this Contract until Contractor has obtained all insurance required
hereunder from a company or companies acceptable to City, nor shall the Contractor allow any Subcontractor
to commence Work on a subcontract until all insurance required of said Subcontractor has been obtained. Proof
of insurance including insurance certificates and endorsements as set forth in Exhibit 4 must be submitted by
the Contractor prior to the City’s execution of the Contract.
12.02 MINIMUM COVERAGE AND LIMITS
Contractor shall maintain the insurance coverage as set forth in Exhibit 4 throughout the term of the Contract.
12.03 CONDITIONS REGARDING INSURANCE COVERAGE AND LIMITS
City and Contractor agree as follows:
A.All insurance coverage and limits provided pursuant to the Contract Documents shall apply to the full
extent of the policies involved, available or applicable. Nothing contained in the Contract Documents
or any other agreement relating to City or its operations limits the application of such insurance
coverage.
B.None of the policies required by this Contract shall be in compliance with these requirements if they
include any limiting endorsement that has not been first submitted to City and approved in writing by
the City’s Risk Manager.
12.04 INSURANCE OBLIGATION IS SEPARATE FROM INDEMNITY OBLIGATION
This Agreement’s insurance provisions:
A.
B.
Are separate and independent from the indemnification and defense provisions in Article 12 of the
Agreement; and
Do not limit, in any way, the applicability, scope, or obligations of the indemnification and defense
provisions in Article 12 of the Agreement.
[END OF ARTICLE]
Page 77 of 120
.
.
Item 8 Page 81 of 221
ARTICLE 13 – BONDS
13.01 REQUIRED BONDS
A. Contractor shall furnish the following bonds:
1. A Performance Bond in an amount equal to one hundred percent (100%) of the total Contract price
in the form shown in Exhibit "1" attached hereto.
2. A Payment Bond (Labor and Material) in an amount equal to one hundred percent (100%) of the
total Contract price in the form shown in Exhibit "2" attached hereto.
3. A Maintenance Bond in an amount equal to ten percent (10%) of the total Contract price in the
form shown in Exhibit "3" attached hereto.
13.02 POWER OF ATTORNEY
All bonds shall be accompanied by a power of attorney from the surety company authorizing the person
executing the bond to sign on behalf of the company. If the bonds are executed outside the State of California,
all copies of the bonds must be countersigned by a California representative of the surety. The signature of the
person executing the bond on behalf of Surety shall be acknowledged by a Notary Public as the signature of the
person designated in the power of attorney.
13.03 APPROVED SURETY
All bonds must be issued by a California admitted surety insurer with the minimum A.M Best Company
Financial strength rating of “A: VII”, or better. Bonds issued by a California admitted surety not listed on
Treasury Circular 570 will be deemed accepted unless specifically rejected by the City. Bonds issued from
admitted surety insurers not listed in Treasury Circular 570 must be accompanied by all documents
enumerated in California Code of Civil Procedure Section 995.660. All such bonds must be accompanied by
a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of
the company. If the bonds are executed outside the State of California, all copies of the bonds must be
countersigned by a California representative of the surety. The signature of the person executing the bond
on behalf of Surety must be acknowledged by a Notary Public as the signature of the person designated in
the power of attorney.
13.04 REQUIRED PROVISIONS
Every bond must display the surety’s bond number and incorporate the Contract for construction of the Work by
reference. The terms of the bonds shall provide that the surety agrees that no change, extension of time,
alteration, or modification of the Contract Documents or the Work to be performed thereunder shall in any way
affect its obligations and shall waive notice of any such change, extension of time, alteration, or modification of
the Contract Documents.
13.05 NEW OR ADDITIONAL SURETIES
If, during the continuance of the Contract, any of the sureties, in the opinion of the City, are or become non-
responsible or otherwise unacceptable to City, City may require other new or additional sureties, which the
Contractor shall furnish to the satisfaction of City within ten (10) days after notice, and in default thereof the
Contract may be suspended and the materials may be purchased or the Work completed as provided in Article
5 herein.
Page 78 of 120
.
.
Item 8 Page 82 of 221
13.06 WAIVER OF MODIFICATIONS AND ALTERATIONS
No modifications or alterations made in the Work to be performed under the Contract or the time of performance
shall operate to release any surety from liability on any bond or bonds required to be given herein. Notice of
such events shall be waived by the surety.
13.07 APPROVAL OF BONDS
The Contract will not be executed by City nor the Notice to Proceed issued until the required bonds have been
received and approved by City. City's decision as to the acceptability of all sureties and bonds is final. No
substitution of the form of the documents will be permitted without the prior written consent of City.
[END OF ARTICLE]
Page 79 of 120
.
.
Item 8 Page 83 of 221
ARTICLE 14 - LABOR PROVISIONS
14.01 WORKING HOURS
A.
B.
C.
Work or activity of any kind shall be limited to the hours from 7:00 a.m. to 7:00 p.m. No construction
noise shall be permitted between the hours of 7:00 p.m. and 7:00 a.m. of the next day.
Work in excess of eight (8) hours per day, on Saturdays, Sundays, or on City holidays requires prior
consent of the Director and is subject to Cost of Overtime Construction Inspection.
Night, Sunday and Holiday Work. No Work shall be performed at night, Sunday, or the ten (10) legal
holidays to wit: New Year’s Day, Martin Luther King, Jr. Day, President’s Day, Cesar Chavez Day,
Memorial Day, Independence Day, Labor Day, Indigenous People’s Day, Veteran’s Day,
Thanksgiving Day, Christmas Eve, Christmas Day and New Year’s Eve, except Work pertaining to
the public safety or with the permission of the Director, and accordance with such regulations as
he/she shall furnish in writing. Before performing any Work at said times, except Work pertaining to
the public safety, the Contractor shall give written notice to the Director so that proper inspection
may be provided. “Night” as used in this paragraph shall be deemed to include the hours from 7:00
P.M. to 7:00 A.M. of the next succeeding day.
14.02 COST OF OVERTIME CONSTRUCTION SERVICES AND INSPECTIONS
A.Overtime construction Work performed at the option of, or for the convenience of, the Contractor will
be inspected by the City at the expense of the Contractor. For any such overtime beyond the regular
8-hour day and for any time worked on Saturday, Sunday, or holidays the charges will be determined
by the City, and submitted to the Contractor for payment.
B.
C.
Equipment, materials, or services provided by the City, in connection with Contractor-initiated overtime
construction Work described in Paragraph 14.02(A), will also be at the expense of the Contractor. The
charges will be determined by the City, and submitted to the Contractor for payment.
There will be no charges to the Contractor for the inspection of overtime Work ordered by the Director
or required by the Contract Documents.
14.03 COMPLIANCE WITH STATE LABOR CODE
A. Contractor shall comply with the provisions of the Labor Code of the State of California and any
amendments thereof.
1. The time of service of any worker employed upon the Work shall be limited and restricted to eight
(8) hours during any one-calendar day, and 40 hours during any one-calendar week.
2. Work performed by employees of the Contractor in excess of eight (8) hours per day, and 40 hours
during any one calendar week, shall be permitted upon compensation for all hours worked in
excess of eight (8) hours per day at not less than one and one-half times the basic rate of pay.
3. The Contractor and every Subcontractor shall keep an accurate record showing the name of and
the actual hours worked each calendar day and each calendar week by each worker employed by
him/her in connection with the Work; the record shall be kept open at all reasonable hours to the
inspection of the City and to the Division of Labor Standards Enforcement of the State of California.
Page 80 of 120
.
.
Item 8 Page 84 of 221
4. In the event City deems Contractor is in violation of this Paragraph 14.03, the Contractor shall, as
a penalty, forfeit Fifty Dollars ($50.00) for each worker employed in the execution of the Contract
by the Contractor or by any Subcontractor for each calendar day for which the employee was
underpaid in addition to an amount sufficient to recover underpaid wages. For each subsequent
violation, a (one hundred dollar) $100 penalty shall apply for each underpaid employee for each
pay period for which the employee was underpaid in addition to an amount sufficient to cover
underpaid wages. This subparagraph is effective to the extent it does not directly conflict with the
overtime penalty provision of California Labor Code Section 558. In the event of such conflict, the
California Labor Code governs over this Paragraph 14.03(A)(4).
14.04 WAGE RATES
A.Prevailing Wages
1. Contractor shall comply with the general prevailing rates of per diem wages and the general
prevailing rates for holiday and overtime Work in the locality in which the Work is to be performed,
for each craft, classification, or type of worker needed to execute the Contract. The Director of
the Department of Industrial Relations of the State of California (pursuant to California Labor
Code) and the United States Secretary of Labor (pursuant to the Davis-Bacon Act) have
determined the general prevailing rates of wages in the locality in which the Work is to be
performed. The rates are available from the City at its Public Works Department, which shall be
made available to any interested party upon request; or online at www.dir.ca.gov/DLSR/PWD/.
To the extent that there are any differences in the federal and state prevailing wage rates for
similar classifications of labor, the Contractor and its Subcontractors shall pay the highest wage
rate.
2. The Contractor shall post a copy of the general prevailing rate of per diem wages at the job site.
3. The Contractor and any Subcontractor under him/her shall pay not less than the specified
prevailing rate of wages to all workers employed in the execution of the Contract.
4. The holidays upon which such rates shall be paid shall be all holidays recognized in the collective
bargaining Contract applicable to the particular craft, classification, or type of worker employed on
the project.
5. The Contractor shall, as a penalty to the State or the City, forfeit not more than Fifty Dollars
($50) for each calendar day, or portion thereof, for each worker paid less than the prevailing
rates for the Work or craft in which the worker is employed under the Contract by the Contractor
or by any Subcontractor under him. The difference between the prevailing wage rates and the
amount paid to each worker for each calendar day or portion thereof for which such worker was
paid less than the stipulated prevailing wage rate shall be paid to such worker by the Contractor.
6. The specified wage rates are minimum rates only and the City will not consider and shall not be
liable for any claims for additional compensation made by the Contractor because of payment
by him/her of any wage rate in excess of the general prevailing rates. All disputes in regard to
the payment of wages in excess of those specified herein shall be adjusted by the Contractor at
his/her own expense.
B.Payroll Records
1. Pursuant to California Labor Code Section 1776, the Contractor and each Subcontractor shall
Page 81 of 120
.
.
Item 8 Page 85 of 221
keep an accurate payroll record, showing the name, address, social security number, Work
classification, straight time and overtime hours worked each day and week, and the actual per
diem wages paid to each journeyman, apprentice, worker or other employee employed in
connection with the Work. The payroll records shall be certified and shall be available for
inspection.
2. The Contractor shall inform the City of the location of the payroll records, including the street
address, city and county, and shall, within five (5) Working Days, provide a notice of change in
location and address.
3. Upon request by the Director, the Contractor shall provide a copy of the certified payroll records
along with a statement of compliance.
14.05 APPRENTICESHIP STANDARDS
A.Compliance with California Labor Code Section 1777.5 et seq. requires all public works contractors
and subcontractors to:
1.
2.
Prior to commencing work on a public works contract, submit Contract Award information
to the applicable joint apprenticeship committee, including an estimate of the journeyman
hours to be performed under the Contract, the number of apprentices to be employed, and
the approximate dates the apprentices will be employed. Use Form DAS-140 from the State
Department of Industrial Relations. The City reserves the right to require Contractor and
Subcontractors to submit a copy of said forms to the City.
Employ apprentices for the public work at a ratio of no less than one (1) hour or apprentice
work for every five (5) hours or labor performed by a journeyman. To request dispatch of
apprentices, use Form DAS-142 from the State Department of Industrial Relations. The
City reserves the right to require Contractor and Subcontractors to submit a copy of said
forms to the City.
3.
4.
Pay the apprentice rate on public works projects only to those apprentices who are
registered, as defined in Labor Code Section 3077.
Contribute to the training fund in the amount identified in the Prevailing Wage Rate
publication for journeyman and apprentices. Contractors who choose not to contribute to
the local training trust fund must make their contributions to the California Apprenticeship
Council, P.O. Box 420603, San Francisco, CA 94142.
B.
C.
California Labor Code Section 1777.7, subdivision (g), provides that the interpretation of Section
1777.5 shall be in accordance with the regulations of the California Apprenticeship Council, with
which Contractor must also comply.
Failure to comply with the provisions of California Labor Code Section 1777.5 et seq. may result in
the loss of the right to bid or perform work on all public works projects for a period of one to three
years and the imposition of a civil penalty of One Hundred Dollars ($100.00) for each calendar day
of noncompliance for the first violation and up to Three Hundred Dollars ($300.00) for each calendar
day of noncompliance for a second or subsequent violation. Contractor should make a separate
copy of this material for each of his/her Subcontractors.
Page 82 of 120
.
.
Item 8 Page 86 of 221
D.
E.
Payroll Records. The Contractor and each Subcontractor shall keep an accurate payroll record,
showing the name, address, social security number, work classification, straight time and overtime
hours worked each day and week, and the actual per diem wages paid to each journeyman
apprentice, worker or other employee employed in connection with the work. The payroll records
shall be certified and shall be submitted to the Project Manager every two weeks.
Statement of Employer Fringe Benefit Payments. Within five (5) calendar days of signing the
Contract or Subcontract, as applicable, the Statement of Employer Payments (DLSE Form PW 26
from the State Department of Industrial Relations) shall be completed for each Contractor and
Subcontractor of any tier who pays benefits to a third party trust, plan or fund for health and welfare
benefits, vacation funds or makes pension contributions. The form must contain, for each worker
classification, the fund, plan or trust name, address, administrator, the amount per hour contributed
and the frequency of contributions. Training fund contributions shall also be reported in this form.
City reserves the right to require Contractors and Subcontractors to submit a copy of said forms to
the City.
14.06 EMPLOYMENT OF APPRENTICES
A.In the performance of this Contract, the Contractor and any Subcontractor shall comply with the
provisions concerning the employment of apprentices in the Labor Code of the State of California
and any amendments thereof, including but not limited to Labor Code Sections 1776, 1777.5, 1777.6
and 1777.7.
B.In the event the Contractor or any Subcontractor willfully fails to comply with the aforesaid provisions
of the Labor Code, such Contractor or Subcontractor shall be subject to the penalties for
noncompliance in the Labor Code of the State of California and any amendments thereof.
14.07 REGISTRATION WITH THE STATE DEPARTMENT OF INDUSTRIAL RELATIONS
In the performance of this Contract, Contractor and/or any Subcontractor must be currently registered and
qualified (including payment of any required fee) with the State Department of Industrial Relations pursuant
to Labor Code section 1725.5. This project is subject to compliance monitoring and enforcement by the State
Department of Industrial Relations.
14.08 CHARACTER OF WORKERS
The Contractor shall not allow his/her agents or employees, Subcontractors, or any agent or employee thereof,
to trespass on premises or lands in the vicinity of the Work. Only skilled supervisors and workers shall be
employed on Work requiring special qualifications, and when required by the Director, the Contractor shall
discharge any person who commits trespass, or in the opinion of the Director, acts in a disorderly, dangerous,
insubordinate, incompetent, or otherwise objectionable manner. Any employee being intoxicated or bringing
or having intoxicating liquors or controlled substances on the Work shall be discharged. Such discharge shall
not be the basis of any claim for compensation of damages against the City or any of its officers, agents, and
employees.
14.09 NO SMOKING – STATE LABOR CODE SECTION 6404.5
The Contractor and its agents, employees, Subcontractors, representatives, and any person under
Contractor’s control, are prohibited from smoking in— or within a 20-foot distance from— the Site, which is a
"place of employment" under California Labor Code § 6404.5.
[END OF ARTICLE]
Page 83 of 120
.
.
Item 8 Page 87 of 221
ARTICLE 15 - DISPUTE RESOLUTION
15.01 SUBMISSION OF CLAIMS
A.By Contractor
Contractor’s right to commence the Claims Dispute Resolution Process shall arise upon the Director’s
written response denying all or part of a Claim. Contractor shall submit a written Statement of Dispute
to the Director within seven (7) Days after the Director rejects all or a portion of Contractor’s Claim.
Contractor’s Statement of Dispute shall be signed under penalty of perjury and shall state with
specificity the events or circumstances giving rise to the Claim, the dates of their occurrence and the
effect, if any, on the compensation due or performance obligations of Contractor under the Construction
Contract. Such Statement of Dispute shall include adequate supporting data to substantiate the
disputed Claim. Adequate supporting data for a Claim relating to the adjustment of the Contractor’s
obligations relative to time of performance shall include a detailed, event-by-event description of the
impact of each delay on Contractor’s time for performance. Adequate supporting data to a Statement
of Dispute submitted by Contractor involving Contractor’s compensation shall include a detailed cost
breakdown and supporting cost data in such form and including such detailed information and other
supporting data as required to demonstrate the grounds for, and precise amount of, the Claim.
B.
C.
By City
City’s right to commence the Claims Dispute Resolution Process shall arise at any time following the
City’s actual discovery of the circumstances giving rise to the Claim. Nothing contained herein shall
preclude City from asserting Claims in response to a Claim asserted by Contractor. A Statement of
Dispute submitted by City shall state the events or circumstances giving rise to the Claim, the dates of
their occurrence and the damages or other relief claimed by City as a result of such events.
Claims Defined
The term “claims” as used herein shall be as defined in California Public Contract Code § 9204(c)(1).
15.02 CLAIMS DISPUTE RESOLUTION PROCESS
The parties shall utilize each of the following steps in the Claims Dispute Resolution Process in the sequence
they appear below. Each party shall participate fully and in good faith in each step in the Claims Dispute
Resolution Process, which good faith effort shall be a condition precedent to the right of each party to proceed
to the next step in the Claims Dispute Resolution Process.
A.Direct Negotiations
Designated representatives of City and Contractor shall meet as soon as possible (but not later than
ten (10) Days after receipt of the Statement of Dispute) in a good faith effort to negotiate a resolution
to the Claim. Each party shall be represented in such negotiations by an authorized representative
with full knowledge of the details of the Claim or defenses being asserted by such party, and with full
authority to resolve such Claim then and there, subject only to City’s right and obligation to obtain City
Council [or other City official] approval of any agreed settlement or resolution. In the Claim involves the
assertion of a right or claim by a Subcontractor against Contractor that is in turn being asserted by
Contractor against City, then such Subcontractor shall also have a representative attend such
negotiations, with the same authority and knowledge as just described. Upon completion of the
Page 84 of 120
.
.
Item 8 Page 88 of 221
meeting, if the Claim is not resolved, the parties may either continue the negotiations or either party
may declare negotiations ended. All discussions that occur during such negotiations and all documents
prepared solely for the purpose of such negotiations shall be confidential and privileged pursuant to
California Evidence Code Sections 1119 and 1152.
B.Deferral of Claims
Following the completion of the negotiations required by Paragraph 15.02-A., all unresolved Claims,
except those that do not involve parties other than the Contractor and City, shall be deferred pending
Final Completion of the Work, subject to City’s right, in its sole and absolute discretion, to require that
the claims Dispute Resolution Process proceed prior to Final Completion. In the event that City does
not elect to proceed with the Claims Dispute Resolution Process prior to Final Completion of the Work,
all Claims that have been deferred until such Final Completion shall be consolidated within a
reasonable time after such Final Completion and thereafter pursued to resolution pursuant to the Claims
Dispute Resolution Process. Nothing contained in this Article 15 shall be interpreted as limiting the
parties’ rights to continue informal negotiations of Claims that have been deferred until such Final
Completion; provided, however, that such informal negotiations shall not be interpreted as altering the
provisions of this Article 15 deferring final determination and resolution of unresolved Claims until after
Final Completion of the Work.
C.Required Provisions On Contract Claim Resolution Under California Law
If a Claim is not resolved by the steps described in this Article 15(A) and 15(B), Public Contract Code
Section 9204 specifies required provisions on resolving contract Claims of any size, and Public Contract
Code Section 20104, et seq., specifies required provisions on resolving contract Claims less than
$375,000. Those statutes constitute a part of this Contract. In the event any other Contract provision
violates such statutes, the applicable statute controls. Public Contract Code Section 9204 provides:
For the purposes of this section, “Claim” means a separate demand by Contractor for (1) a time
extension, (2) payment or money or damages arising from Work done by or on behalf of Contractor
arising under the contract documents and payment of which is not otherwise expressly provided
for or the claimant is not otherwise entitled to, or (3) an amount the payment of which is disputed
by the City.
Upon receipt of a Claim the City shall conduct a reasonable review of the Claim and within 45
days, or if the City’s governing body must approve the City’s response to the Claim and the
governing body has not met within the 45 days, then within three (3) days of the Agency’s meeting,
shall provide Contractor with a written statement identifying what portion of the Claim is disputed
and what portion is undisputed. Should the City take no action on the Claim within 45 days of
submission, it shall be deemed denied.
If the Contractor disputes the City’s response to its Claim, including a failure to respond, it may
submit via registered mail or certified mail, return receipt requested, a written demand for an
informal conference to meet and confer for settlement of the issues in dispute. The City shall
schedule such a meet and confer conference within 30 days for settlement of the dispute. Within
ten (10) days of the meet and confer conference the City shall provide Contractor with a written
statement identifying the portion of the Claim that remains in dispute and the portion that is
undisputed. If the Contractor disputes the City’s statement, it shall inform the City and they shall
mutually agree to a mediator within 10 business days of the written statement.
The City shall pay the undisputed portions of the Claim within 60 days of the issuance of a written
Page 85 of 120
.
.
Item 8 Page 89 of 221
statement identifying an undisputed portion.
Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to
nonbinding mediation, with the City and the Contractor sharing the associated costs equally. The
City and Contractor shall mutually agree to a mediator within 10 business days after the disputed
portion of the Claim has been identified in writing. If the parties cannot agree upon a mediator,
each party shall select a mediator and those mediators shall select a qualified neutral third party
to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and
costs charged by its respective mediator in connection with the selection of the neutral mediator.
If mediation is unsuccessful, the parts of the Claim remaining in dispute shall be subject to
applicable procedures outside this section.
For Claims under $375,000, unless the parties agree otherwise in writing, mediation pursuant to
these provisions shall excuse the mediation obligation under Public Contracting Code section
20104.4(a).
The parties may mutually agree, in writing, to waive the mediation requirements of this subsection
and proceed to the commencement of a civil action.
Failure by the City to respond to a Claim from Contractor within the time periods described in this
subdivision or to otherwise meet the time requirements of this section shall result in the Claim
being deemed rejected in its entirety. A Claim that is denied by reason of the City’s failure to have
responded to a Claim, or its failure to otherwise meet the time requirements of this section, shall
not constitute an adverse finding with regard to the merits of the Claim or the responsibility or
qualifications of the Contractor.
Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per
annum.
If a Subcontractor or a lower tier subcontractor lacks legal standing to assert a Claim against the
City because privity of contract does not exist, the Contractor may present to the City a Claim on
behalf of a Subcontractor or lower tier subcontractor. A Subcontractor may request in writing, either
on his or her own behalf or on behalf of a lower tier subcontractor, that the Contractor present a
Claim for work which was performed by the Subcontractor or by a lower tier subcontractor on
behalf of the Subcontractor. The Subcontractor requesting that the Claim be presented to the
public entity shall furnish reasonable documentation to support the Claim. Within 45 days of receipt
of this written request, the Contractor shall notify the Subcontractor in writing as to whether the
Contractor presented the Claim to the City and, if the original Contractor did not present the Claim,
provide the Subcontractor with a statement of the reasons for not having done so.
Nothing in this section shall impose liability upon the City that makes loans or grants available
through a competitive application process, for the failure of an awardee to meet its contractual
obligations.
Public Contract Code Section 20104, et seq., provides:
For the purposes of this section, “Claim” means a separate demand by Contractor of $375,000 or
less for (1) a time extension, (2) payment or money or damages arising from Work done by or on
behalf of Contractor arising under the Contract Documents and payment of which is not otherwise
expressly provided for or the claimant is not otherwise entitled to, or (3) an amount the payment of
which is disputed by the City. Claims that together total more than $375,000 do not qualify as a
Page 86 of 120
.
.
Item 8 Page 90 of 221
“separate demand of $375,000 or less,” and are not subject to this section.
A voucher, invoice, payment application, or other routine or authorized form of request for payment
is not a Claim for purposes of this section. If such request is disputed as to liability or amount, then
the disputed portion of the submission may be converted to a Claim under this section by
submitting a separate Claim in compliance with Contract Documents Claim submission
requirements.
Caution. This section does not apply to tort Claims, and nothing in this section is intended nor
shall be construed to change the time periods for filing tort Claims or actions specified by Chapter
1 and Chapter 2 of Part 3 of Division 3.6 of Title 1 of the California Government Code.
The Claim must be in writing, submitted in compliance with all requirements of the Contract
Documents.
For Claims of fifty thousand dollars ($50,000) or less, the City shall respond in writing within forty-
five (45) days of receipt of the Claim, or the City may request in writing within thirty (30) days of
receipt of the Claim, any additional documentation supporting the Claim or relating to any defenses
or Claims the City may have against claimant. If additional information is thereafter required, it shall
be requested and provided in accordance with this section upon mutual agreement of the City and
claimant. The City’s written response to the Claim, as further documented, shall be submitted to
claimant within fifteen (15) days after receipt of further documentation or within a period of time no
greater than taken by claimant in producing the additional information, whichever is greater.
For Claims over Fifty Thousand Dollars ($50,000) and less than or equal to $375,000: the City
shall respond in writing within sixty (60) days of receipt of the Claim, or the City may request in
writing within thirty (30) days of receipt of the Claim, any additional documentation supporting the
Claim or relating to any defenses or Claims the City may have against claimant. If additional
information is thereafter required, it shall be requested and provided in accordance with this
section, upon mutual agreement of the City and claimant; the City’s written response to the Claim,
as further documented, shall be submitted to claimant within thirty (30) days after receipt of further
documentation or within a period of time no greater than taken by claimant in producing the
additional information, whichever is greater.
Meet and Confer: If claimant disputes the City’s written response, or the City fails to respond within
the time prescribed above, claimant shall notify the City, in writing, either within fifteen (15) days of
receipt of the City’s response or within fifteen (15) days of the City’s failure to timely respond, and
demand an informal conference to meet and confer for settlement of the issues in dispute. Upon
demand the City will schedule a meet and confer conference within thirty (30) days for settlement
of the dispute.
Following the meet and confer conference described herein, if the Claim or any portion remains in
dispute, claimant may file a Claim as provided in Chapter 1 (commencing with Section 900) and Chapter
2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the California Government Code.
For purposes of those provisions, the running of the period of time within which a Claim must be filed
shall be tolled from the time claimant submits its written Claim as set forth herein, until the time that
Claim is denied as a result of the meet and confer process, including any period of time utilized by the
meet and confer process.
Page 87 of 120
.
.
Item 8 Page 91 of 221
D.Legal Proceedings
If the Claim is not resolved by the procedures described in this Article 15 (A), 15 (B) and 15 (C) above,
then the party wishing to further pursue resolution or determination of the Claim may submit the Claim
for determination by commencing legal proceedings in a court of competent jurisdiction.
15.03 NO WAIVER
Participation in the Claims Dispute Resolution Process shall not constitute a waiver, release or compromise of
any defense of either party, including, without limitation, any defense based on the assertion that the rights of
Contractor that are the basis of a Claim were previously waived by Contractor due to failure to comply with the
Contract Documents, including, without limitation, Contractor’s failure to comply with any time periods for
providing notices or for submission or supporting documentation of Claims.
[END OF ARTICLE]
Page 88 of 120
.
.
Item 8 Page 92 of 221
ARTICLE 16 - ACCOUNTING RECORDS
16.01 MAINTENANCE OF RECORDS
Contractor shall keep, and shall include in its contracts with its Subcontractors, provisions requiring its
Subcontractors to keep full and detailed books and records in accordance with the requirements of the
Contract Documents, including the following: all information, materials and data of every kind and character
(hard copy, as well as computer readable data if it exists), that have any bearing on or pertain to any matters,
rights, duties or obligations relating to the Project or the performance of the Work, including, without limitation,
agreements, purchase orders, leases, contracts, commitments, arrangements, notes, change orders, change
order requests, estimates, field orders, schedules, diaries, logs, reports, shop drawings, samples, exemplars,
Drawings, Specifications, invoices, delivery tickets, receipts, vouchers, cancelled checks, memoranda;
accounting records; job cost reports; job cost files (including complete documentation covering negotiated
settlements); backcharge; general ledgers; documentation of cash and trade discounts earned; insurance
rebates and dividends, and other documents relating in way to Claims or Change Orders, Construction
Change Directives, Work Directives, or other claims for payment related to the Project asserted by Contractor
or any Subcontractor (“Accounting Records”). Contractor shall exercise such controls as may be necessary
for proper financial management of the Work. Such accounting and control systems shall comply with
prevailing custom and practice for similar projects, be satisfactory to City and shall include preservation of
such records for a period of five (5) years after approval of the Notice of Completion and Acceptance by City,
or for such longer period as may be required by applicable laws.
16.02 ACCESS TO RECORDS
Contractor shall allow, and shall include in its contracts with its Subcontractors provisions requiring its
Subcontractors to allow, City and its authorized representative(s), auditors, attorneys and accountants, upon
twenty-four (24) hours notice to Contractor, full access to inspect and copy all books and records relating to
the Project that Contractor is required to maintain pursuant to Paragraph 16.01, above.
16.03 CONTRACTOR NONCOMPLIANCE, WITHHOLDING
Contractor's compliance with Paragraphs 16.01 and 16.02, above, shall be a condition precedent to
maintenance of any legal action or arbitration by Contractor against City. In addition to and without limitation
upon City's other rights and remedies for breach, including any other provisions for withholding set forth in the
Contract Documents, City shall have the right, exercised in its sole discretion, to withhold from any payment
to Contractor due under a current Application for Payment an additional sum of up to ten percent (10%) of the
total amount set forth in such Application for Payment, until Contractor and its Subcontractors have complied
with any outstanding and unsatisfied request by City under this Article 16. Upon such compliance with this
Article 16, any additional monies withheld pursuant to this Paragraph 16.03 shall be released to Contractor.
16.04 SPECIFIC ENFORCEMENT BY CITY
Contractor agrees that any failure by Contractor or any Subcontractor to provide access to its books and
records as required by this Article 16 shall be specifically enforceable, by issuance of a preliminary and/or
permanent mandatory injunction by a court of competent jurisdiction based on affidavits submitted to such
court and without the necessity of oral testimony, to compel Contractor to permit access, inspection, audits
and/or reproduction of such books and records or to require delivery of such books and records to City for
inspection, audit and/or reproduction.
[END OF ARTICLE]
Page 89 of 120
.
.
Item 8 Page 93 of 221
ARTICLE 17-MISCELLANEOUS PROVISIONS
17.01 COMPLIANCE WITH APPLICABLE LAWS
A.Notices, Compliance
Contractor shall give all notices required by governmental authorities and comply with all applicable
laws and lawful orders of governmental authorities, including but not limited to the provisions of the
California Code of Regulations applicable to contractors performing construction and all laws,
ordinances, rules, regulations and lawful orders relating to safety, prevailing wage and equal
employment opportunities.
B.Taxes, Employee Benefits
Contractor shall pay at its own expense, at no cost to the City and without adjustment to the Contract
Sum, all local, state and federal taxes, including, without limitation all sales, consumer, business
license, use and similar taxes on materials, labor or other items furnished for the Work or portions
thereof provided by Contractor or Subcontractors, all taxes arising out of its operations under the
Contract Documents and all benefits, insurance, taxes and contributions for social security and
unemployment insurance which are measured by wages, salaries or other remuneration paid to
Contractor's employees. If under federal excise tax law any transaction hereunder constitutes a sale
on which a federal excise tax is imposed and the sale is exempt from such excise tax because it is a
sale for its exclusive use, then City, upon request, will execute documents necessary to show that is a
political subdivision of the State for the purposes of such exemption and that the sale is for the exclusive
use of the City, in which case no excise tax for such materials shall be included in the Bid or Contract
Sum.
C.Notice of Violations
Contractor shall immediately notify the City and Director in writing of any instruction received from the
City, Director, Architect or other person or entity that, if implemented, would cause a violation of any
applicable law or lawful order of a governmental authority. If Contractor fails to provide such notice,
then Director shall be entitled to assume that such instruction is in compliance with applicable laws and
lawful orders of governmental authorities. If Contractor observes that any portion of the Drawings and
Specifications or Work are at variance with applicable laws or lawful orders of governmental authorities,
or should Contractor become aware of conditions not covered by the Contract Documents which will
result in Work being at variance therewith, Contractor shall promptly notify Director in writing. If, without
such notice to Director, Contractor or any Subcontractor performs any Work which it knew, or through
the exercise of reasonable care should have known, was contrary to lawful orders of governmental
authorities or applicable laws, then Contractor shall bear all resulting losses at its own expense, at no
cost to City and without adjustment to the Contract Sum.
17.02 OWNERSHIP OF DESIGN DOCUMENTS
A.Property of City
All Design Documents, Contract Documents and Submittals (including, without limitation, all copies
thereof) and all designs and building designs depicted therein are and shall remain the sole and
exclusive property of the City and the City shall solely and exclusively hold all copyrights thereto.
Without derogation the City’s rights under this Paragraph, the Contractor and Subcontractors are
Page 90 of 120
.
.
Item 8 Page 94 of 221
granted a limited, non-exclusive license, revocable at will of City, to use and reproduce applicable
portions of the Contract Documents and Submittals as appropriate to and for use in the execution of
the Work and for no other purpose.
B.
C.
Documents on Site
Contractor shall keep on the Project site, at all times and for use by City, Director, Inspectors of Record
and City’s Consultants, a complete set of the Contract Documents that have been approved by
applicable Governmental Authorities.
Delivery to City
All Design Documents, Contract Documents and Submittals in the possession of Contractor or
Subcontractors shall be returned to the City upon the earlier of Final Completion or termination of the
Construction Contract; provided, however, that Contractor and each Subcontractor shall have the right
to retain one (1) copy of the Contract Documents and Submittals for its permanent records.
D.Subcontractors
Contractor shall take all necessary steps to assure that a provision is included in all subcontracts with
Subcontractors, of every tier, who perform Work on the Project establishing, protecting and preserving
the, City’s rights set forth in this Paragraph.
17.03 AMENDMENTS
The Contract Documents may be amended only by a written instrument duly executed by the parties or their
respective successors or assigns.
17.04 WAIVER
Either party's waiver of any breach or failure to enforce any of the terms, covenants, conditions or other
provisions of the Contract Documents at any time shall not in any way limit or waive that party's right thereafter
to enforce or compel strict compliance with every term, covenant, condition or other provision, any course of
dealing or custom of the trade notwithstanding. Furthermore, if the parties make and implement any
interpretation of the Contract Documents without documenting such interpretation by an instrument in writing
signed by both parties, such interpretation and implementation thereof will not be binding in the event of any
future disputes.
17.05 INDEPENDENT CONTRACTOR
Contractor is an independent contractor, and nothing contained in the Contract Documents shall be construed
as constituting any relationship with City other than that of Project owner and independent contractor. In no
event shall the relationship between City and Contractor be construed as creating any relationship whatsoever
between City and Contractor's employees. Neither Contractor nor any of its employees is or shall be deemed
to be an employee of City. Except as otherwise specified in the Contract Documents, Contractor has sole
authority and responsibility to employ, discharge and otherwise control its employees and has complete and
sole responsibility as a principal for its agents, for all Subcontractors and for all other Persons that Contractor
or any Subcontractor hires to perform or assist in performing the Work.
Page 91 of 120
.
.
Item 8 Page 95 of 221
17.06 SUCCESSORS AND ASSIGNS
The Contract Documents shall be binding upon and inure to the benefit of City and Contractor and their
permitted successors, assigns and legal representatives.
A.
B.
City may assign all or part of its right, title and interest in and to any Contract Documents, including
rights with respect to the Payment and Performance Bonds, to (a) any other governmental person
as permitted by governmental rules, provided that the successor or assignee has assumed all of
City's obligations, duties and liabilities under the Contract Document then in effect; and (b) any other
Person with the prior written approval of Contractor.
Contractor may collaterally assign its rights to receive payment under the Contract Documents.
Contractor may not delegate any of its duties hereunder, except to Subcontractors as expressly
otherwise permitted in the Contract Documents. Contractor's assignment or delegation of any of its
Work under the Contract Documents shall be ineffective to relieve Contractor of its responsibility for
the Work assigned or delegated, unless City, in its sole discretion, has approved such relief from
responsibility.
Any assignment of money shall be subject to all proper set-offs and withholdings in favor of City and
to all deductions provided for in the Contract. All money withheld, whether assigned or not, shall be
subject to being used by City for completion of the Work, should Contractor be in default.
C.Except for the limited circumstances set forth in Paragraph 17.06-B, above, Contractor may not,
without the prior written consent of City in its sole discretion, voluntarily or involuntarily assign,
convey, transfer, pledge, mortgage or otherwise encumber its rights or interests under the Contract
Documents. No partner, joint venturer, member or shareholder of Contractor may assign, convey,
transfer, pledge, mortgage or otherwise encumber its ownership interest in Contractor without the
prior written consent of City, in City’s sole discretion.
17.07 SURVIVAL
Contractor’s representations and warranties, the dispute resolution provisions contained in Article 15, and all
other provisions which by their inherent character should survive termination of the Contract and/or Final
Acceptance, shall survive the termination of the Contract and the Final Acceptance Date.
17.08 LIMITATION ON THIRD PARTY BENEFICIARIES
It is not intended by any of the provisions of the Contract Documents to create any third party beneficiary
hereunder or to authorize anyone not a party hereto to maintain a suit for personal injury or property damage
pursuant to the terms or provisions hereof, except to the extent that specific provisions (such as the warranty
and indemnity provisions) identify third parties and state that they are entitled to benefits hereunder. The
duties, obligations and responsibilities of the parties to the Contract Documents with respect to such third
parties shall remain as imposed by law. The Contract Documents shall not be construed to create a
contractual relationship of any kind between City and a Subcontractor or any other Person except Contractor.
17.09 PERSONAL LIABILITY OF CITY EMPLOYEES
City’s authorized representatives are acting solely as agents and representatives of City when carrying out
the provisions of or exercising the power or authority granted to them under the Contract. They shall not be
liable either personally or as employees of City for actions in their ordinary course of employment.
Page 92 of 120
.
.
Item 8 Page 96 of 221
No agent, consultant, Council member, officer or authorized employee of City, shall be personally responsible
for any liability arising under the Contract.
17.10 NO ESTOPPEL
City shall not, nor shall any officer thereof, be precluded or estopped by any measurement, estimate or
certificate made or given by the City representative or other officer, agent, or employee of City under any
provisions of the Contract from at any time (either before or after the final completion and acceptance of the
Work and payment therefor) pursuant to any such measurement, estimate or certificate showing the true and
correct amount and character of the work done, and materials furnished by Contractor or any person under
the Contract or from showing at any time that any such measurement, estimate or certificate is untrue and
incorrect, or improperly made in any particular, or that the work and materials, or any part thereof, do not in
fact conform to the Contract Documents. Notwithstanding any such measurement, estimate or certificate, or
payment made in accordance therewith, City shall not be precluded or estopped from recovering from
Contractor and its Sureties such damages as City may sustain by reason of Contractor’s failure to comply or
to have complied with the Contract Documents.
17.11 GOVERNING LAW
The laws of the State of California govern the construction and interpretation of the Contract Documents,
without regard to conflict of law principles. Unless the Contract Documents provide otherwise, any reference
to laws, ordinances, rules, or regulations include their later amendment, modifications, and successor
legislation. If Contractor or City brings a lawsuit to enforce or interpret one or more provisions of the Contract
Documents, jurisdiction is in the Superior Court of the County of Los Angeles, California, or where otherwise
appropriate, in the United States District Court, Central District of California. Contractor and City acknowledge
that the Contract Documents were negotiated, entered into, and executed—and the Work was performed—in
the City of Vernon, California.
17.12 FURTHER ASSURANCES
Contractor shall promptly execute and deliver to City all such instruments and other documents and
assurances as are reasonably requested by City to further evidence the obligations of Contractor hereunder,
including assurances regarding assignments of Subcontractors contained herein.
17.13 SEVERABILITY
If any clause, provision, section, paragraph or part of the Contract is ruled invalid by a court having proper
jurisdiction, then the parties shall: (a) promptly meet and negotiate a substitute for such clause, provision,
section, paragraph or part, which shall, to the greatest extent legally permissible, effect the original intent of
the parties, including an equitable adjustment to the Contract Price to account for any change in the Work
resulting from such invalidated portion; and (b) if necessary or desirable, apply to the court or other decision
maker (as applicable) which declared such invalidity for an interpretation of the invalidated portion to guide
the negotiations. The invalidity or unenforceability of any such clause, provision, section, paragraph or part
shall not affect the validity or enforceability of the balance of the Contract, which shall be construed and
enforced as if the Contract did not contain such invalid or unenforceable clause, provision, section, paragraph
or part.
Page 93 of 120
.
.
Item 8 Page 97 of 221
17.14 HEADINGS
The captions of the sections of the Contract are for convenience only and shall not be deemed part of the
Contract or considered in construing the Contract.
17.15 ENTIRE AGREEMENT
The Contract Documents contain the entire understanding of the parties with respect to the subject matter
hereof and supersede all prior agreements, understandings, statements, representations and negotiations
between the parties with respect to its subject matter.
17.16 COUNTERPARTS
This instrument may be executed in two or more counterparts, each of which shall be deemed an original, but
all of which together shall constitute one and the same instrument.
[END OF ARTICLE]
Page 94 of 120
.
.
Item 8 Page 98 of 221
.
.
Item 8 Page 99 of 221
.
.
Item 8 Page 100 of 221
.
.
Item 8 Page 101 of 221
.
.
Item 8 Page 102 of 221
.
.
Item 8 Page 103 of 221
.
.
Item 8 Page 104 of 221
.
.
Item 8 Page 105 of 221
.
.
Item 8 Page 106 of 221
.
.
Item 8 Page 107 of 221
.
.
Item 8 Page 108 of 221
.
.
Item 8 Page 109 of 221
.
.
Item 8 Page 110 of 221
.
.
Item 8 Page 111 of 221
.
.
Item 8 Page 112 of 221
.
.
Item 8 Page 113 of 221
.
.
Item 8 Page 114 of 221
.
.
Item 8 Page 115 of 221
.
.
Item 8 Page 116 of 221
.
.
Item 8 Page 117 of 221
.
.
Item 8 Page 118 of 221
.
.
Item 8 Page 119 of 221
EXHIBIT 4
INSURANCE REQUIREMENTS
1.0 REQUIRED INSURANCE POLICIES
At its own expense, Contractor shall obtain, pay for, and maintain – and shall require each of its
Subcontractors to obtain and maintain – for the duration of the Agreement, policies of insurance meeting the following
requirements:
A.Workers’ Compensation/Employer’s Liability Insurance shall provide workers’ compensation statutory
benefits as required by law. The policy shall be endorsed to waiver all rights of subrogation against City, its directors,
commissioners, officers, employees, and volunteers for losses arising from performance of this Contract.
1.Employer’s Liability insurance shall be in an amount not less than:
(a)
(b)
ONE MILLION DOLLARS ($1,000,000) per accident for bodily injury or disease;
ONE MILLION DOLLARS ($1,000,000) per employee for bodily injury or disease;
and
(c)ONE MILLION DOLLARS ($1,000,000) policy limit.
B.Commercial General Liability (“CGL”) (primary). City and its employees and agents shall be added as
additional insureds, not limiting coverage for the additional insured to “ongoing operations” or in any way excluding
coverage for completed operations. Coverage shall apply on a primary, non-contributing basis in relation to any other
insurance or self-insurance, primary or excess, available to City or any employee, representative or agent of City.
Coverage shall not be limited to the vicarious liability or supervisory role of any additional insured. Coverage shall
contain no contractors’ limitation or other endorsement limiting the scope of coverage for liability arising from explosion,
collapse, or underground property damage.
1.CGL insurance must not be written for less than the limits of liability specified as follows:
(a)ONE MILLION DOLLARS ($1,000,000) per occurrence for bodily injury (including
accidental death) to any one person;
(b)ONE MILLION DOLLARS ($1,000,000) per occurrence for personal and
advertising injury to any one person;
(c)
(d)
ONE MILLION DOLLARS ($1,000,000) per occurrence for property damage; and
TWO MILLION DOLLARS ($2,000,000) general aggregate limit.
2.CGL insurance must include all major divisions of coverage and must cover:
(a)Premises Operations (including Explosion, Collapse, and Underground [“X,C,U”]
coverages as applicable);
(b)Independent Contractor’s Protective;
Page 107 of 120
.
.
Item 8 Page 120 of 221
(c)Independent Contractors;
(d)Products and Completed Operations (maintain same limits as above until five (5)
years after recordation of Notice of Completion);
(e)
(f)
Personal and Advertising Injury (with Employer’s Liability Exclusion deleted);
Contractual Liability (including specified provision for Contractor’s obligation under
Article 11 of the General Conditions); and
(g)Broad Form Property Damage.
3.Umbrella or Excess Liability Insurance (over primary), if provided, shall be at least as broad
as any underlying coverage. Coverage shall be provided on a “pay on behalf” basis, with
defense costs payable in addition to policy limits. There shall be no cross liability exclusion
and no contractor’s limitation endorsement. The policy shall have starting and ending dates
concurrent with the underlying coverages. The Named Insured may determine the layering
of primary and excess liability insurance provided that if such layering differs from that
described here, the actual coverage program meets the minimum total required limits and
complies with all other requirements listed here. The coverage shall also apply to
automobile liability.
C.Business Automobile Liability Insurance
1.Business Automobile Liability Insurance must cover all vehicles, whether rented, leased,
hired, scheduled, owned or non-owned. If Contractor does not own any vehicles, this
requirement may be satisfied by a non-owned vehicle endorsement to the general and
umbrella liability policies. Business Automobile Liability Insurance coverage amounts shall
not be less than the following:
(a)ONE MILLION DOLLARS ($1,000,000) per occurrence for bodily injury (including
accidental death) to any one person; and
(b)
(c)
ONE MILLION DOLLARS ($1,000,000) per occurrence for property damage; or
ONE MILLION DOLLARS ($1,000,000) combined single limit.
D.Contractors Pollution Liability Insurance (CPL)
1.Contractor or Subcontractor shall obtain, pay for, and maintain for the duration of the
Contract Contractors Pollution Liability insurance that provides coverage for liability caused
by pollution conditions arising out of the operations of the Contractor. Coverage shall be
included on behalf of the insured for covered claims arising out of the actions of independent
contractors. If the insured is using Subcontractors, the policy must include work performed
“by or on behalf” of the insured.
2.The policy limit shall provide coverage of no less than one million dollars ($1,000,000) per
claim and in the aggregate. Coverage shall apply to bodily injury; property damage,
including loss of use of damaged property or of property that has not been physically inured;
cleanup costs; and costs of defense, including costs and expenses incurred in the
Page 108 of 120
.
.
Item 8 Page 121 of 221
investigation, defense, or settlement of claims.
3.All activities contemplated in the Contract shall be specifically scheduled on the CPL policy
as “covered operations.” In addition, the policy shall provide coverage for the hauling of
waste from the Project site to the final disposal location, including non-owned disposal sites.
4.The policy shall specifically provide for a duty to defend on the part of the insurer. City, its
officers, employees and agents shall be added to the policy as additional insureds by
endorsement.
E.Builder’s Risk Insurance
1. Builder’s Risk Insurance covering all real and personal property for “all risks” of loss or
“comprehensive perils” coverage including but not limited to the perils of earth movement
including earthquake and flood for all buildings, structures, fixtures, materials, supplies,
machinery and equipment to be used in or incidental to the construction at the site, off site,
or in transit, for the full replacement value of such properties. Coverage shall be included for
property of others in the care, custody or control of the insured for which any insured may be
liable. The City will purchase a builder’s risk policy for the Project instead of a contractor
purchased policy. Bidder should not include cost for this coverage in his/her bid.
F.If Contractor maintains broader coverage and/or higher limits than the minimums shown above, City
requires and shall be entitled to the broader coverage and/or the higher limits maintained by the Contractor.
Any available insurance proceeds in excess of the specified minimum limits of insurance and coverage shall be
available to the City.
2.0 GENERAL REQUIREMENTS—ALL POLICIES
A.Qualifications of Insurer. At all times during the term of this Contract, Contractor’s insurance
company must meet all of the following requirements:
1.“Admitted” insurer by the State of California Department of Insurance or be listed on the
California Department of Insurance’s “List of Surplus Line Insurers” (“LESLI”), or non-
admitted insurer approved by the City.
2.
3.
Domiciled within, and organized under the laws of, a State of the United States; and
Carry an A.M. Best & Company minimum rating of “A:VII”.
B.Continuation Coverage. For insurance coverages that are required to remain in force after the
Final Payment, and if reasonably available, Contractor shall submit to City, with the final Application for Payment, all
certificates and additional insured endorsements evidencing the continuation of such coverage.
C.Deductibles or Self-Insured Retentions. All deductibles or self-insured retentions are subject to
City’s review and approval, in its sole discretion.
D.Commercial General Liability and Business Automobile insurance policies must be written on an
“occurrence” basis and must add the City of Vernon and its officers, agents, employees and representatives as
additional insureds.
Page 109 of 120
.
.
Item 8 Page 122 of 221
E.Contractor’s Insurance Primary. Other insurance (whether primary, excess, contingent or self-
insurance, or any other basis) available to City, or its representatives, or both, is excess over Contractor’s insurance.
City’s insurance, or self-insurance, or both, will not contribute with Contractor’s insurance policy.
F.Waiver of Subrogation Endorsement. Contractor and Contractor’s insurance company waive—
and shall not exercise— any right of recovery or subrogation that Contractor or the insurer may have against City, or
its representatives, or both.
G.Separation of Insureds. Contractor’s insurance policy applies separately to each insured or
additional insured who is seeking coverage, or against whom a claim is made or suit is brought, except that the
naming of multiple insureds will not increase an insurance company’s limits of liability.
H.Claims by Other Insureds. Contractor’s insurance policy applies to a claim or suit brought by an
additional insured against a Named Insured or other insured, arising out of bodily injury, personal injury, advertising
injury, or property damage.
I.Premiums. City is not liable for a premium payment or another expense under Contractor’s policy
At any time during the duration of this Contract, City may do any one or more of the following:J.
1.
2.
Review this Agreement’s insurance coverage requirements;
Require that Contractor obtain, pay for, and maintain more insurance depending on City’s
assessment of any one or more of the following factors:
(a) City’s risk of liability or exposure arising out of, or in any way connected with, the
services of Contractor under this Agreement;
(b) The nature or number of accidents, claims, or lawsuits arising out of, or in any way
connected with, the services of Contractor under this Agreement; or
(c) The availability, or affordability, or both, of increased liability insurance coverage.
3.Require the Contractor to obtain, pay for, or maintain a bond (as a replacement for an
insurance coverage) from a California corporate surety, guaranteeing payment to City for
liability, or costs, or both, that City incurs during City’s investigation, administration, or
defense of a claim or a suit arising out of this Agreement; or
K.Contractor shall maintain the insurance policy without interruption, from the Project’s
commencement date to the Final Payment date, or until a date that City specifies for any coverage that Contractor
must maintain after the Final Payment.
L.Contractor shall not allow any insurance to expire, cancel, terminate, lapse, or non-renew.
Contractor’s insurance company shall mail City written notice at least thirty (30) days in advance of the policy’s
cancellation, termination, non-renewal, or reduction in coverage and ten (10) days before its insurance policy’s
expiration, cancellation, termination, or non-renewal, Contractor shall deliver to City evidence of the required
coverage as proof that Contractor’s insurance policy has been renewed or replaced with another insurance policy
which, during the duration of this Agreement, meets all of this Agreement’s insurance requirements.
M.At any time, upon City’s request, Contractor shall furnish satisfactory proof of each type of
insurance coverage required— including a certified copy of the insurance policy or policies; certificates, endorsements,
Page 110 of 120
.
.
Item 8 Page 123 of 221
renewals, or replacements; and documents comprising Contractor’s self-insurance program— all in a form and content
acceptable to the City Attorney or City’s Risk Manager.
N.If Contractor hires, employs, or uses one or more Subcontractor(s) to perform work, services,
operations, or activities on Contractor’s behalf, Contractor shall ensure that the Subcontractor complies with the
following.
1.
2.
Meets, and fully complies with, this Agreement’s insurance requirements; and
Furnishes City at any time upon its request, with a complete copy of the Subcontractor’s
insurance policy or policies for City’s review, or approval, or both. Failure of City to
request copies of such documents shall not impose any liability on City, or its employees.
O.Contractor’s failure to comply with an insurance provision in this Agreement constitutes a material
breach upon which City may immediately terminate or suspend Contractor’s performance of this Agreement, or
invoke another remedy that this Agreement or the law allows. At its discretion and without waiving any other rights it
may have pursuant to law, City has the right but not a duty to obtain or renew the insurance and pay all or part of the
premiums. Upon demand, Contractor shall repay City for all sums or monies that City paid to obtain, renew, or
reinstate the insurance, or City may offset the cost of the premium against any sums or monies that City may owe
Contractor.
3.0 CONTRACTOR’S SUBMITTAL OF CERTIFICATES AND ENDORSEMENTS
A.Contractor shall have its insurance carrier(s) or self-insurance administrator(s) complete and
execute the following insurance documents and shall deliver said documents at the same time Contractor delivers
this Agreement to City. City will neither sign this Agreement nor issue a “Notice to Proceed” until the City Attorney or
City’s Risk Manager has reviewed and approved all insurance documents. City's decision as to the acceptability of all
insurance documents is final. Sample insurance documents in the City’s approved format are set forth in Exhibit 4.
B.Required Submittals for Commercial General Liability and Business Automobile Insurance and
Contractor’s Pollution Liability Insurance. The following submittals must be on forms satisfactory to the City Attorney or
City’s Risk Manager, and signed by the insurance carrier or its authorized representative – which fully meet the
requirements of, and contain provisions entirely consistent with, all of the insurance requirements set forth herein.
1.
2.
3.
“Certificate of Insurance”
“Additional Insured Endorsement”
Waiver of Subrogation Endorsement: “Waiver of Transfer to Rights of Recover Against Others”
Both Certificates of Insurance and Additional Insured Endorsements must read as follows: “The City of Vernon,
and its officers, agents, employees and representatives are included as additional insureds under the policy(s). This
insurance is primary to all other insurance of the City. The City’s insurance and self-insurance will apply in excess of,
and will not contribute with this insurance. This insurance applies separately to each insured or additional insured who
is seeking coverage, or against whom a claim is made or a suit is brought. The issuing company shall mail thirty (30)
days advance notice to the City for any policy cancellation, termination, non-renewal, or reduction in coverage.”
C.Required Submittals for Workers’ Compensation Insurance. Contractor shall provide City with a
certificate of insurance and a subrogation endorsement on forms satisfactory to the City Attorney or City’s Risk
Manager, and signed by the insurance carrier or its authorized representative – which fully meet the requirements of,
and contain provisions entirely consistent with, this Contract’s workers compensation insurance requirements. If
Contractor is self-insured for workers’ compensation, a copy of the “Certificate of Consent to Self-insure” from the
State of California is required; or if Contractor is lawfully exempt from workers’ compensation laws, an “Affirmation of
Exemption from Labor Code §3700” form is required.
Page 111 of 120
.
.
Item 8 Page 124 of 221
D.Required Evidence of Builder’s Risk Coverage. Contractor will provide a certificate of insurance and
a declarations page on a form satisfactory to the City Attorney or City’s Risk Manager, and signed by the insurance
carrier or its authorized representative. The policy terms must fully meet the requirements of, and contain provisions
entirely consistent with, all of the insurance requirements set forth herein. The City shall be named as a loss payee on
the insurance policy for the full replacement value of all buildings, structures, fixtures and materials to be constructed,
maintained, repaired or supplied pursuant to this Contract.
E.Contractor agrees to monitor and review all such coverage and assumes all responsibility for
ensuring that all required coverage is provided. Contractor agrees to obtain certificates evidencing such coverage.
F.Contractor agrees to provide immediate notice to City of any claim or loss against Contractor that
includes City or any other indemnitee as a defendant. City assumes no obligation or liability by such notice, but has the
right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City.
G.No liability policy shall contain any provision or definition that would serve to eliminate so-called “third
party action over” claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or
subcontractor.
H.Any “self-insured retention” must be declared and approved by City. City reserves the right to require
the self-insured retention to be eliminated or replaced by a deductible as approved by the City. Self-funding, policy
fronting or other mechanisms to avoid risk transfer are not acceptable. If Contractor has such a program, Contractor
must fully disclose such program to City.
Page 112 of 120
.
.
Item 8 Page 125 of 221
.
.
Item 8 Page 126 of 221
.
.
Item 8 Page 127 of 221
.
.
Item 8 Page 128 of 221
.
.
Item 8 Page 129 of 221
EXHIBIT B
SPECIAL PROVISIONS
SPECIFIC FOR THIS PROJECT
Page 116 of 120
.
.
Item 8 Page 130 of 221
EXHIBIT B – SPECIAL PROVISIONS
SPECIFIC FOR THIS PROJECT
Citywide Traffic Signal Maintenance &
Repair FY2024
Contract No. 20240283
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
1
.
.
Item 8 Page 131 of 221
Table of Contents
A. General..................................................................................................................................................4
1.
2.
3.
4.
5.
6.
7.
8.
9.
Scope of Work..................................................................................................................................4
Contract Specifications ....................................................................................................................4
Specifications ...................................................................................................................................4
Length of Contract ...........................................................................................................................4
Liquidated Damages.........................................................................................................................4
Delays and Extensions of time.........................................................................................................4
Quality of Work................................................................................................................................5
Unit Prices........................................................................................................................................5
Extra Work .......................................................................................................................................5
10. Compliance with Laws, Regulations, and Safe Practices .................................................................5
B. Construction Specifications ..................................................................................................................6
1.
2.
3.
4.
5.
6.
7.
8.
9.
Scheduling of Work..........................................................................................................................6
Construction Hours..........................................................................................................................6
Traffic Requirements .......................................................................................................................6
Notification of Utilities.....................................................................................................................8
Protection of the Public ...................................................................................................................8
Noise Restrictions ............................................................................................................................8
Construction Order of Work ............................................................................................................8
Character of Workers.......................................................................................................................9
Examination of Site ..........................................................................................................................9
10. Mobilization .....................................................................................................................................9
11. Dust Control.....................................................................................................................................9
12. Best Management Practices (BMP’s)...............................................................................................9
13. Temporary Water Meter................................................................................................................10
14. Cleaning of Site During Construction.............................................................................................10
15. Parkway Restoration......................................................................................................................10
16. Final Cleaning of Site and Restoration...........................................................................................10
17. Contractor Responsibility...............................................................................................................10
C. Routine Maintenance .........................................................................................................................11
1.
2.
Monthly and Annual Preventative Maintenance...........................................................................11
Traffic Signal Control Equipment ...................................................................................................11
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
2
.
.
Item 8 Page 132 of 221
3.New Installation or Deletions ........................................................................................................12
D. Extraordinary Maintenance ................................................................................................................12
1.
2.
3.
4.
5.
6.
Definitions......................................................................................................................................12
Notification ....................................................................................................................................12
Emergencies...................................................................................................................................12
Method of Payment.......................................................................................................................13
Rewire ............................................................................................................................................14
Knockdowns...................................................................................................................................14
E. Miscellaneous .....................................................................................................................................14
1.
2.
3.
4.
5.
6.
Records ..........................................................................................................................................14
Notification ....................................................................................................................................14
Shutdowns .....................................................................................................................................14
Compensation for Routine Maintenance ...................................................................................... 15
Types of Signals..............................................................................................................................15
Traffic Detector Loops....................................................................................................................15
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
3
.
.
Item 8 Page 133 of 221
A.General
1. Scope of Work
This project consists of ongoing and regular field preventative maintenance and repair of traffic
signal equipment, as further described in these special provisions and Attachment “C” -
Monthly Preventative Maintenance Tasks, and other related equipment by truly trained and
qualified personnel. In addition, the Contractor shall provide and maintain Emergency Service
response of the City’s forty-two (42) signalized intersections on a 24-hour a day, 7 days per
week basis, including all holidays.
2. Contract Specifications
The location map is shown on Attachment “A”. The written list of locations for the 42 signalized
intersections are shown on Attachment “B”. The list of the monthly preventative maintenance
tasks are shown on Attachment “C”.
3. Specifications
Installation and payment for all the work shall conform to the Standard Specifications for Public
Works Construction (2021 Edition), State of California Department of Transportation “Caltrans”
Standard Plans (2022 Edition) and State of California Department of Transportation Standard
Specifications (2018 Edition), latest edition of the California Manual on Uniform Traffic Control
Devices, and the City of Vernon Standard Plans.
The Standard Specifications for Public Works Construction (2021 Edition) shall be referred to
hereafter as the “Standard Specifications”. The Caltrans Standard Plans (2022 Edition) shall be
referred to hereafter as the “Caltrans Standard Plans”.
4. Length of Contract
The term of the contract shall not exceed three (3) years pursuant to the Vernon Municipal
Code beginning upon City Council approval.
5. Liquidated Damages
As stated in Section 3.07 in Exhibit A – General Conditions, the Contractor shall pay the sum of
$500.00 for each day past the first and last seven (7) working days of each month for non-
completion of the Routine Maintenance-Inspection and Cleaning work. Contractor shall pay to
the City, or have withheld from monies due it, the sum of $200.00 for each hour late when
responding to emergency situations.
6. Delays and Extensions of time
The provisions of Section 6-4 entitled "Delays and Extensions of Time" of the Standard
Specifications shall apply except as modified and supplemented below.
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
4
.
.
Item 8 Page 134 of 221
The second paragraph of subsection 6-4.1 is hereby deleted and the following paragraph shall be
inserted in its place:
No extension of time will be granted for a delay caused by the inability of the Contractor to obtain
materials, equipment and labor, except as authorized by the City's Project Manager. The length
of contract time stipulated includes any time which may be required to obtain materials,
equipment and labor, and the Contractor in submitting a bid shall be deemed to have ascertained
the availability of materials, equipment and labor and considered same in his/her proposed
construction schedule.
7. Quality of Work
The provisions of Section 3 entitled "Control of the Work" of the Standard Specifications shall
apply. In addition, any work deemed unacceptable by the City's Project Manager, whether a
cause is determined or not shall be repaired or replaced by the Contractor at his/her expense.
8. Unit Prices
All costs not covered by specific unit prices but required for a complete job in place, shall be
included in the items most related to the work.
9. Extra Work
In the event the City and the Contractor are unable to negotiate an agreed price for extra work,
which is acceptable to both parties, payment shall be made based on time and materials as
follows:
Work by the Contractor: The following percentages shall be added to the Contractor's
cost and shall constitute the markup for all overhead and profits:
1.
2.
3.
4.
Labor 33%
15%
15%
15%
Materials
Equipment Rental
Other Items and Expenditures
Work by the Subcontractor: When all or any part of the extra work is performed by a
subcontractor, the markup provided by the Contractor as mentioned above shall apply to
the subcontractor’s actual costs. A markup of 5% of the subcontracted portion of each
extra work may be added for the Contractor.
10. Compliance with Laws, Regulations, and Safe Practices
The Contractor shall perform all work in a safe, competent manner and in accordance with all
federal, state, and local statues, regulations, ordinances, rules, and governmental orders. The
Contractor will be solely and completely responsible for the conditions of the job site, including
safety of all persons and property during performance of the work. This requirement will apply
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
5
.
.
Item 8 Page 135 of 221
continuously and not be limited to normal working hours. Inspection of the Contractor's
performance by the City, its agents, or employees is not intended to include review of the
adequacy of the Contractor's safety measures in or near the job site.
B.Construction Specifications
1. Scheduling of Work
The Contractor shall submit his/her preventative maintenance work schedule to the City's Project
Manager prior to the pre-construction meeting. This schedule must be reviewed and accepted
by the City's Project Manager before the Contractor will be permitted to begin work. The
Contractor shall give 24 hours’ notice to the City's Project Manager prior to the start of the work.
2. Construction Hours
All preventative work shall occur Monday-Friday between the hours of 7:00 am to 4:00 pm,
excluding emergency work.
Contractor shall perform Monthly Maintenance-Inspection and Cleaning work to half of the
signalized intersection listed in Attachment “B” and shown in Attachment “A” during the first
seven (7) working days of each month and the other half shall be performed during the last seven
(7) working days of each month unless otherwise approved by the City's Project Manager.
3. Traffic Requirements
Before any partial or total closure of any street, the Contractor shall be required to obtain the
approval of the City's Project Manager.
The Contractor shall comply with Section 600 and 601 of the Standard Specifications and provide
safe and continuous passage for pedestrian and vehicular traffic at all times. The Contractor shall
provide and maintain all necessary flagmen, barricades, delineators, signs, flashers and any other
safety equipment as set forth in the latest publication of the State of California, Division of
Highways, Traffic Manual or as required by the City's Project Manager to ensure safe passage of
traffic.
The following provisions shall apply unless otherwise directed by the City's Project Manager.
The traffic control shall be in accordance with the California Manual of Temporary Traffic
Controls (CA MUTCD, latest edition) handbook.
Except for emergency work, the Contractor shall submit detour plans to the City's
Project Manager for approval at least ten (10) calendar days prior to any proposed
shutdowns where traffic flow has to be diverted. This will not apply to emergency
responses.
The Contractor shall submit traffic channelization and detour plans to the City's Project
Manager for approval at least fourteen (14) fourteen working days prior to
commencement of work. Traffic control plans (previously approved by the City's Project
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
6
.
.
Item 8 Page 136 of 221
Manager) shall be maintained within the construction zone for the duration of the
construction.
Traffic Control Work shall include all labor, materials, tools, equipment, transportation
and incidentals necessary to maintain and control all vehicular and pedestrian traffic
through the construction site. The cost of furnishing and maintaining traffic control during
the construction including flagmen as necessary must be included in the various bid items,
and no extra compensation will be paid to the Contractor.
In addition to the requirements of the MUTCD handbook, the City's Project Manager may
require fifteen (15) foot wide travel lanes, flatter traffic tapers, additional traffic control
devices, barricading, and other signing in order to ensure driver awareness and safety in
the construction area. Further, the Contractor shall provide Type II or Type III barricades
with flashers and delineators at locations as determined by the City's Project Manager.
The Contractor shall provide access to local businesses at all times unless otherwise
approved by the City's Project Manager. This may include providing steel plates at some
driveway approaches. Message boards shall be used for pre-construction warnings, lane
closure/detour areas, and placed 14 calendar days in advance of the closure/detour.
The posting of "NO PARKING" signs within the construction limits is permitted with the
approval of the City Engineer. "NO PARKING" signs shall contain a "TOW AWAY" warning.
These signs shall be furnished and maintained by the Contractor and shall be of the type
approved by the City's Project Manager. Each sign posted shall have the date and time
indicating the duration of the "NO PARKING" prohibition printed clearly in a manner
acceptable to the City's Project Manager. New signs shall be posted when changes occur
in the parking prohibitions indicated on the previously posted signs. Signs must be posted
at least seventy-two (72) hours in advance of construction or they are invalid. Signs shall
not be attached to trees or taped to street light or traffic signal poles. Contractor shall
only post "NO PARKING SIGNS" on one side of the street at a time unless otherwise
approved by the City's Project Manager. The signs shall be effective for no more than five
(5) working days and shall be removed within twenty-four (24) hours after the work is
complete. If signs are not removed in a timely manner, the City's Project Manager may
suspend all work until the signage requirement is corrected. All signs, lights and other
warning devices used shall be in accordance with State of California Business and
Transportation City Department of Public Works Manual of Warning Signs, Lights and
Devices for Use in Performance of Work upon Highways.
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
7
.
.
Item 8 Page 137 of 221
4. Notification of Utilities
The provisions of Section 402 entitled "Utilities" of the Standard Specifications shall apply. The
Contractor shall contact the Underground Service Alert of Southern California (U.S.A.) at least
three (3) working days in advance of the construction work.
5. Protection of the Public
The Contractor shall take such steps and precautions as his/her operations warrant to protect
the public from danger, loss of life, loss of property or interruption of public services. Unforeseen
conditions may arise which will require that immediate provisions be made to protect the public
from danger or loss, or damage to life and property, due directly or indirectly to prosecution of
work under the contract. Whenever, in the opinion of the City's Project Manager, a condition
exists in which the Contractor has not taken sufficient precaution of public safety, protection of
utilities, and/or protection of adjacent structures or property, the City's Project Manager will
order the Contractor to provide a remedy for the condition. If the Contractor fails to act on the
situation within a reasonable time period as determined by the City's Project Manager, or in the
event of an emergency situation, the City's Project Manager may provide suitable protection by
causing such work to be done and material to be furnished as, in the opinion of the City's Project
Manager, may seem reasonable and necessary. The cost and expense of all repairs (including
labor and materials) as are deemed necessary, shall be borne by the Contractor. All expenses
incurred by the City for emergency repairs will be deducted from the final payment due to the
Contractor.
6. Noise Restrictions
The Contractor may not operate certain power equipment, within a residential area or within a
radius of five-hundred (500) feet from a residential area, except during the following times:
From 7:00 am to 4:00 pm, Monday through Friday
From 6:00 am to 5:00 pm on Saturday and Sunday
In addition, the noise level from the Contractor's operations shall not exceed eighty-five (85) dBA
when measured within a one hundred (100) foot radius at any time.
7. Construction Order of Work
Work shall be scheduled so as to lessen the impact upon businesses. All construction shall
conform to the latest edition of the Standard Specifications and shall proceed in a smooth,
efficient, timely and continuous manner. As such, once construction is started in a work area, the
Contractor will be required to work continuously in that work area until construction has been
completed and the work area is open and accessible to both vehicular and pedestrian traffic in a
manner approved by the City's Project Manager before the next stage of work will be allowed to
begin.
Once construction is started in a work area, the Contractor shall not withdraw manpower or
equipment from that work area in order to start construction in another work area if doing so, in
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
8
.
.
Item 8 Page 138 of 221
the opinion of the City's Project Manager, delays the completion of the work presently under
construction.
The Contractor shall maintain continuous access to all residents and businesses within the project
limits, including drive approaches, unless the Contractor has obtained the approval of the City's
Project Manager to close either such access or drive approach.
No stockpiling of material and construction equipment on public streets or sidewalks will be
permitted on this project unless approved by the City's Project Manager. Material and equipment
placed on public streets, sidewalks and on the construction areas shall be used the same day.
8. Character of Workers
If any subcontractor or person employed by the Contractor shall fail or refuse to carry out
directions of the City's Project Manager or shall appear to the City's Project Manager to be
incompetent or act in a disorderly or otherwise improper manner, he/she shall be immediately
discharged from the project on the request of the City's Project Manager, and such person shall
not be reemployed on the work. If said individual has an ownership interest in the contracting
entity, the City's Project Manager will serve written notice upon the Contractor and the Surety
providing the faithful performance bond, in accordance with Section 6-8, "Termination of the
Contractor by Default" of the Standard Specifications, demanding complete and satisfactory
compliance with the Contract.
9. Examination of Site
The Contractor is required to examine the site and judge for themselves the location. Physical
conditions, substructures and surroundings of the proposed work.
10. Mobilization
The cost of all preparatory work and operations for the multiple movements of personnel,
equipment, supplies, and incidentals to the project site must be included in the various bid items,
and no extra compensation will be paid to the Contractor.
11. Dust Control
Throughout all phases of construction, including suspension of work, and until final acceptance
of the project, the Contractor shall abate dust nuisance by cleaning, sweeping and sprinkling
water, or other means as necessary when requested by the City. Failure of the Contractor to
comply with the City's Project Manager cleanup orders may result in an order to suspend work
until the condition is corrected. No additional compensation or extension of contract completion
time will be allowed as a result of such suspension. The cost of furnishing and operating dust
control during the construction project shall be included in the various bid items, and no extra
compensation will be paid to the Contractor.
12. Best Management Practices (BMP’s)
The Contractor shall submit a copy of their Best Management Practices (BMPs) to the City
Engineer for review ten (10) days prior to the beginning of any work.
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
9
.
.
Item 8 Page 139 of 221
The Contractor is hereby notified that specific construction practices in the Standard Specifications,
Section 3-12.6.2, “Best Management Practices (BMPs)” are considered to be Best Management
Practices. The Contractor shall implement and maintain such BMP’s as are relevant to the work, and
as are specifically required by the Plans or Special Provisions. The Contractor shall not commence
activity until the BMP submittal has been reviewed and approved.
13. Temporary Water Meter
If necessary, the Contractor shall obtain a temporary water meter from the City of Vernon
Water Department by placing a deposit of $1,000. Contractor shall pay for all water used.
Contractor shall not relocate the service. The Contractor shall call the City of Vernon Water
Department to relocate the service and will be charged fifty dollars ($50.00) for each relocation.
14. Cleaning of Site During Construction
During construction, all existing improvements, including pavement, sidewalk, curb and gutter,
adjacent to the work area shall be swept free from soils, gravel, dirt or debris on a daily basis.
The Contractor is responsible for maintaining all sidewalk, curb and gutter areas within the
construction zone free from loose materials at all times.
15. Parkway Restoration
Parkway and lawn areas disturbed by construction and/or root removal operations shall be
backfilled with material approved by the City's Project Manager, mechanically compacted to 90%
of optimum density, and graded to join the adjacent improvements and parkway lawn areas. The
parkway and lawn area shall be restored by sodding in accordance with Section 801-4.8 of the
Standard Specifications, and the irrigation system to match the adjacent parkway area. The
payment for this work shall be included in the most appropriately related bid item.
16. Final Cleaning of Site and Restoration
The Contractor shall be responsible for cleaning and restoration of all damaged existing
improvements such as sidewalk, driveway, curb and gutter, and private property at no cost to
the City. The Contractor shall remove all loose aggregates by sweeping all the sidewalks and
gutters. The cost of furnishing and operating such sweeping after the construction of the project
must be included in the various bid items, and no extra compensation will be paid to the
Contractor.
17. Contractor Responsibility
The Contractor shall be responsible for the final product and shall make any quality control,
adjustments and corrections necessary to obtain the final product accepted by the City's Project
Manager. The Contractor shall perform process and quality control sampling and testing and
exercise management control the work of his/her subcontractors, technicians and workers to
ensure that the milling, transporting, spreading, compaction, and finishing processes conform to
these Specifications. The City's Project Manager shall have unrestricted access to the laboratory,
sampling, testing sites, and all information resulting from mix design and quality control activities.
All Quality Control testing results shall be submitted to the City's Project Manager on a daily basis.
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
10
.
.
Item 8 Page 140 of 221
C.Routine Maintenance
The Contractor shall enact a continuing comprehensive maintenance program designed to
eliminate or reduce any incidence of malfunctions, complaints, and extension of the useful life
of the City’s traffic signal equipment. The program shall include at a minimum the following:
1. Monthly and Annual Preventative Maintenance
The Contractor shall provide monthly and annual preventative maintenance on the forty-two (42)
signalized intersections per the list of tasks in Attachment “C”. The Contractor shall complete
Monthly Preventative Maintenance Checks per the list for each maintenance inspection and shall
indicate the minimum work required for each item.
The Contractor shall maintain a record of all service calls and work performed upon the signal
equipment, listing dates, hour of day and description of service work performed. A copy of such
record shall be maintained at all times within the controller cabinet at each signal location. A log
sheet giving a brief description of all routine and extraordinary maintenance activities shall be
attached to each monthly invoice. A monthly report of activities for each intersection's events,
sorted by time, is to be included in the reports requested by the City. This is to be accompanied by
a report of all activities sorted by time as well.
The Contractor shall maintain electronic records of the completed checklist form for each
intersection in the Contractor’s MMS throughout the term of this contract. The Contractor shall
make available via a web interface electronic records of the completed monthly preventative
maintenance checks as well as activity reports in real time.
The Contractor shall maintain two separate logs at each signalized intersection under this contract.
One log shall detail each monthly and preventative maintenance inspection by the Contractor. The
Contractor shall complete at a minimum on this log, the inspection date, arrival time, departure
time, type of inspection, any findings or repairs, and the Contractor’s employee name or ID. The
other log shall detail any extraordinary repairs or service calls for the intersection. This log shall detail
the nature of the emergency/service call, the Contractor’s findings, the repair made, Repair Order
number, if applicable, arrival time at the intersection, departure time, and the Contractor’s
employee name or ID. All information must be collected and submitted with the monthly invoice.
2. Traffic Signal Control Equipment
The Contractor shall repair, replace or otherwise render in good working order any and all
defective parts of all traffic signal control equipment. Whenever the Contractor replaces any
defective parts on either a temporary and/or permanent basis, the Contractor shall identify the
parts being replaced by manufacture’s make and model. Furthermore, the Contractor shall only
use new parts for permanent replacement. Exceptions to this requirement shall only occur on
an individual basis upon advance written approval from the City.
No permanent changes of traffic signal control devices shall be done without prior written
approval from the City. In addition, any changes shall also be indicated on the maintenance or
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
11
.
.
Item 8 Page 141 of 221
repair log within the traffic signal controller cabinet. The Contractor agrees to notify the City in
advance of any planned or scheduled traffic signal turn-offs/ turn-ons only upon prior written
approval by the City.
3. New Installation or Deletions
The Contractor shall maintain any new traffic signal equipment and any other related devices,
which are installed for or by the City throughout the term of the contract. These devices will be
deemed to be added to the existing signalized intersections listed on Attachment “B” when the
City notifies the Contractor of the installation thereof. These added devices, regardless of the
complexity and technology shall be maintained in the same manner and for the same flat rate
as those devices already covered by the contract.
Should responsibility for the maintenance of any current or future traffic signal device cease to
be the City’s, the City will notify the Contractor in writing of the last date to perform
maintenance.
D. Extraordinary Maintenance
1. Definitions
Extraordinary maintenance shall consist of but not be limited to the following:
a. Repair or replacement of failed or malfunctioning parts of the signal system if
caused by vehicle collision, vandalism, civil disorder, windstorm, natural disasters,
street construction, or excavation.
b. Minor upgrading or installations as directed by the City.
c. Replacement of detector loops including saw cut lead-ins as required.
d. Replacement of pedestrian indications.
e. Installation of complete new pedestrian heads.
f. Installation or replacement of pedestrian push buttons.
g. Installation of new traffic signal heads.
h. Installation of Light Emitting Diodes (LED’s) as directed by the City representative.
2. Notification
The Contractor shall contact the City's Project Manager regarding any extraordinary
maintenance work except emergency repairs and seek his/her prior approval in writing before
the work is scheduled. The Contractor shall notify the City representative by telephone at least
twenty-four (24) hours in advance before any work is commenced, except in emergencies
where injury or property damage may result without prompt response.
3. Emergencies
The Contractor shall respond immediately to emergency calls such as a total blackout, when
directed by the City, and dispatch the qualified personnel and equipment to reach the site
within two (2) hours under normal circumstances.
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
12
.
.
Item 8 Page 142 of 221
For the emergency repair of a signal, which is totally blacked out, the following procedure of
traffic control shall apply:
a. The Contractor shall dispatch qualified personnel and equipment to reach the site
within two (2) hours under normal conditions. The Contractor's vehicles shall carry
traffic cones, flashing arrow boards, traffic warning signs, etc., which shall be used
when directing traffic during an emergency and/or when deemed necessary by the
signal technician, the City's Project Manager or his representative.
b. If no police officer is present and temporary stop signs have been set up when the
Contractor arrives at the site, the Contractor shall set up more traffic warning and
control devices, if deemed necessary, and proceed to repair the signal. After the
signal is back in operation, the Contractor shall set the intersection in flash, remove
all of the temporary traffic control devices and place those devices owned by the
City off to the side of the road and then switch the intersection back to normal
operation.
c. If a police officer is still at the site when the Contractor arrives, the Contractor shall
quickly examine the signal, evaluate the situation and discuss it with the police
officer. If the repair will take only a few minutes, the police officer may stay to
continue to direct traffic while the Contractor repairs the signal. If the repair will
take longer than the officer can wait, the Contractor shall immediately set up
necessary traffic control devices and other necessary warning devices and relieve
the police officer.
4. Method of Payment
Upon receipt of an itemized invoice within thirty (30) days of completion of the work, City shall
compensate Contractor for such repairs required beyond the scope of routine maintenance as
follows:
a. Materials - The city shall pay the Contractor for materials used in extraordinary
maintenance per the bid items on the Bidder’s Proposal plus the percentage markup
specified in this agreement NOT TO EXCEED 15%. All materials and parts shall be
new or have the approval of the City's Project Manager, if otherwise. The City has
the right to inspect the Contractor's records to verify any material costs used in
extraordinary maintenance.
b. Direct Labor - The Contractor shall present with their monthly invoice with a record
of hours spent in extraordinary maintenance of traffic signals and appurtenances per
intersection. City shall pay the Contractor for such hours of extraordinary
maintenance at the rates specified in this agreement. Said hourly rates shall be the
total cost to the City. Rates shall include all compensation for wages, profit,
overhead, any fringe benefits such as employer payments to, or on behalf of
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
13
.
.
Item 8 Page 143 of 221
workmen for health and welfare, insurance worker's compensation, pension,
vacation, sick leave or any local, State, Federal or union tax or assessment.
c. Equipment - The City shall pay Contractor for equipment used in extraordinary
maintenance on a per trip basis as specified in this agreement. The listing of per trip
equipment rates shall constitute total rates to be paid by City when specified
equipment is used. No additional payments of any kind shall be paid for equipment
except as specified in this agreement of per trip rates as stated. No additional
compensation shall be paid for transporting the equipment to or from the job site.
d. Traffic Collisions – Repairs or replacement of failed or malfunctioning parts of the
signal system caused by vehicle collisions shall be billed separately per incident.
5. Rewire
Rewire of any intersection will be charged on a time and material basis. Prior to any work of this
type, a written proposal will be submitted by Contractor and approved by the City's Project
Manager before any work commences.
6. Knockdowns
All knockdowns (except for a Type I-A pole) will be charged on a time and material basis. A
written proposal will be submitted by Contractor and approved by the City's Project Manager
for the replacement of any damaged poles or mast arms before the order is placed.
E.Miscellaneous
1. Records
The Contractor shall maintain a record of all service calls and work performed upon the signal
equipment, listing dates, hour of day and description of service work performed. A copy of such
record shall be maintained at all times within the controller cabinet at each signal location.
A log sheet giving a brief description of all routine and extraordinary maintenance activities
shall be attached to each monthly invoice.
A monthly report of activities for each intersection's events, sorted by time, is to be included in
the reports requested by the City. This is to be accompanied by a report of all activities sorted
by time as well.
2. Notification
The Contractor shall notify by telephone, the City's Project Manager or his authorized
representative, within 24 hours of the alteration of the operation of any signal or the
installation or removal of any substitute controller or component.
3. Shutdowns
The Contractor shall notify the Vernon Police Department and the City's Project Manager or his
authorized representative of any signal turn-offs or turn-ons necessitated by his operations and
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
14
.
.
Item 8 Page 144 of 221
shall not make said turn-offs or turn-ons until a police officer is present or unless given
permission to proceed without police control by the City's Project Manager or his authorized
representative.
4. Compensation for Routine Maintenance
The City will compensate Contractor at the agreed price per signalized intersection per month.
Said compensation shall include all services rendered, labor, materials, equipment, overhead
and profit. Delays due to Contractor are subject to liquidated damages as specified in the
specifications (Section B-1.07).
5. Types of Signals
The agreed upon prices for both routine and extraordinary maintenance shall apply to all types
of signal controllers, accessories and systems as may exist in the City now or that may be
installed during the life of the contract.
6. Traffic Detector Loops
The traffic detector loops shall be installed per the Caltrans Standard Plan ES-5B. Loops and
“home runs” shall be cut 4 inches deep with the stub out cut to match. Home run loops shall be
spliced in series and twisted at a rate of 3 turns per foot. Cut out, deburr, and place new 4 inches
deep threaded ring for stub out.
The cost of furnishing and installation of new traffic detector loops and “home runs” complete in
place and in working order must be included in the loop bid item.
EXHIBIT B – SPECIAL PROVISIONS
Contract No. 20240283
15
.
.
Item 8 Page 145 of 221
EXHIBIT C
EQUAL EMPLOYMENT OPPORTUNITY
PRACTICES PROVISIONS
A. Contractor certifies and represents that, during the performance of this Agreement, the contractor and each
subcontractor shall adhere to equal opportunity employment practices to assure that applicants and employees
are treated equally and are not discriminated against because of their race, religious creed, color, national
origin, ancestry, handicap, sex, or age. Contractor further certifies that it will not maintain any segregated
facilities.
B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for employment placed by or
on behalf of Contractor, state that it is an "Equal Opportunity Employer" or that all qualified applicants will
receive consideration for employment without regard to their race, religious creed, color, national origin,
ancestry, handicap, sex or age.
C. Contractor agrees that it shall, if requested to do so by the City, certify that it has not, in the performance of this
Agreement, discriminated against applicants or employees because of their membership in a protected class.
D. Contractor agrees to provide the City with access to, and, if requested to do so by City, through its awarding
authority, provide copies of all of its records pertaining or relating to its employment practices, except to the
extent such records or portions of such records are confidential or privileged under state or federal law.
E. Nothing contained in this Agreement shall be construed in any manner as to require or permit any act which is
prohibited by law.
Page 117 of 120
.
.
Item 8 Page 146 of 221
ATTACHMENT A
TRAFFIC SIGNAL LOCATIONS MAP
SPECIFIC FOR THIS PROJECT
Page 118 of 120
.
.
Item 8 Page 147 of 221
.
.
Item 8 Page 148 of 221
ATTACHMENT B
INTERSECTIONS
SPECIFIC FOR THIS PROJECT
Page 119 of 120
.
.
Item 8 Page 149 of 221
ATTACHMENT “B”
VERNON SIGNALIZED INTERSECTIONS
1. 26TH STREET @ BONNIE BEACH PLACE
2. 37TH STREET @ SEVILLE AVENUE
3. ALCOA AVENUE @ FRUITLAND AVENUE
4. ALCOA AVENUE @ LEONIS BOULEVARD
5. ATLANTIC BOULEVARD @ 3030 ATLANTIC
6. ATLANTIC BOULEVARD @ BANDINI BOULEVARD
7. ATLANTIC BOULEVARD @ DISTRICT BOULEVARD
8. BANDINI BOULEVARD @ I-710 OFF-RAMP
9. BANDINI BOULEVARD @ BONNIE BEACH PLACE
10. BANDINI BOULEVARD @ PENNINGTON WAY
11. BANDINI BOULEVARD @ SIERRA PINE AVENUE
12. BANDINI BOULEVARD @ SUNOL/AYERS
13. BOYLE AVENUE @ FRUITLAND AVENUE
14. BOYLE AVENUE @ LEONIS BOULEVARD
15. BOYLE AVENUE @ RANDOLPH STREET
16. DISTRICT BOULEVARD @ LOMA VISTA AVENUE
17. DOWNEY ROAD @ DISTRICT/LEONIS BOULEVARD
18. DOWNEY ROAD @ FRUITLAND AVENUE
19. DOWNEY ROAD @ VERNON AVENUE
20. PACIFIC BOULEVARD @ FRUITLAND AVENUE
21. PACIFIC BOULEVARD @ LEONIS BOULEVARD
22. SANTA FE AVENUE @ 25TH/26TH STREET
23. SANTA FE AVENUE @ 27TH STREET
24. SANTA FE AVENUE @ 28TH STREET
25. SANTA FE AVENUE @ 37TH STREET
26. SANTA FE AVENUE @ 38TH STREET
27. SANTA FE AVENUE @ VERNON AVENUE
28. SANTA FE AVENUE @ PACIFIC BOULEVARD/VERNON AVENUE
29. SANTA FE AVENUE @ 48TH STREET
30. SANTA FE AVENUE @ FRUITLAND AVENUE/51ST STREET
31. SANTA FE AVENUE @ 55TH STREET
32. SLAUSON AVENUE @ ALCOA AVENUE
33. SLAUSON AVENUE @ BOYLE AVENUE
34. SLAUSON AVENUE @ DOWNEY ROAD/MALBURG WAY
35. SOTO STREET @ 26TH STREET
36. SOTO STREET @ 2800 SOTO
37. SOTO STREET @ 37TH STREET/BANDINI BOULEVARD
38. SOTO STREET @ FARMER JOHN DRIVEWAY
39. SOTO STREET @ FRUITLAND AVENUE
40. SOTO STREET @ LEONIS BOULEVARD
41. SOTO STREET @ VERNON AVENUE
42. WASHINGTON BOULEVARD @ HOBART YARD DRIVEWAY
.
.
Item 8 Page 150 of 221
ATTACHMENT C
TASKS
SPECIFIC FOR THIS PROJECT
Page 120 of 120
.
.
Item 8 Page 151 of 221
ATTACHMENT “C”
MONTHLY PREVENTATIVE MAINTENANCE TASKS
I.ROUTINE MONTHLY MAINTENANCE
GENERAL:
It is the intent of the City of Vernon that the City's 41 traffic signals are maintained so as to
provide the motoring public with a minimum of inconvenience caused by the failure of any
signal components, and to present a well-kept signal installation. All traffic signal work: sha1l be
performed in accordance with the current Standard Plans and Section 86. "Signals, Lighting, and
Electrical Systems" of the Standard Specifications for the State of California, Department of
Transportation and the current City Standard Traffic Details. This maintenance sha1l be
extended to include future signal installations at the proposed unit prices. The following is a list
of tasks to be completed for each intersection on a monthly basis:
CONTROLLER CABINET:
CONTROLLER CABINET MOUNTING:
Check the snugness of the nuts on the cabinet anchor bolts, tighten, if necessary, being sure not
to distort the cabinet door opening by over tightening.
CONTROLLER CABINET FOUNDATION SEAL:
If standing water or evidence of water is present inside the bottom of the cabinet, check the seal
between the bottom of the cabinet and the foundation for deterioration; report the need for a
reseal, as necessary.
DOOR GASKETS:
Check all door gaskets on the controller cabinet, service cabinet and any other enclosures for
evidence of moisture or deterioration. Report the need to completely replace any gaskets
showing signs of leaking or deterioration.
CABINET VENTS:
Check the vents in both the cabinet door and above the door, or at the top of the cabinet to ensure
that they are free of any foreign material.
AIR FILTER:
Vacuum or knock the dust out of filters. Filters shall be changed every 6 months unless damaged.
For any permanent filters, vacuum, wash or knock the dust out of the filter. Permanent filters
require no replacing unless damaged.
CABINET FAN:
Verify that the cabinet fan operates properly with a minimum of noise.
Contract No. 20240283 Attachment C - MONTHLY PREVENTATIVE MAINTENANCE TASKS 1 of 5.
.
Item 8 Page 152 of 221
THERMOSTAT:
Verify that the cabinet fan thermostat is set at 100 degrees.
INTERIOR LIGHT:
Verify the proper operation of the cabinet's interior light. If a manual light is installed, check for
proper operation.
DOOR PANEL HARNESSES:
Check the harnesses leading from the main panel to the police and auxiliary panels on the cabinet
door to ensure they are not being pinched and do not bind against the cabinet door. Adjust, if
necessary.
HINGES AND LOCKS:
Check for free movement of all doors, latching assemblies and locks on the controller cabinet,
service cabinet and any other enclosures. Use a minimum of oil or spray lubricant and remove
any excess. Use oil for this purpose which does not attract dirt or leave residue.
VACUUM CABINET:
Blow or brush off shelves, terminal blocks and components and thoroughly vacuum the interior
of the cabinet, including the police panel.
INSECT INFESTATION:
Check for any signs of ants, wasps or other insects within the cabinet and report any positive
findings for the City to take the necessary steps for extermination and prevention.
CABINET GROUNDING:
Using appropriate equipment, check during the 1st month of the contract and then annually the
resistance between AC and Ground.
SERVICE CONNECTIONS:
Verify that the neutral, ground and power connections are secure in the controller and service
cabinets.
PLUG-IN COMPONENTS:
Check that each plug-in component Crack mount detectors, relays, load switches, etc.) fits tightly
and securely.
TERMINAL CONNECTIONS:
Test semi-annually or following any wiring repair, each terminal screw by backing off slightly
then retightening to confirm that it is secure.
GROUND FAULT RECEPTACLE:
Verify the proper operation of "Test" and "Reset" buttons on GFI type outlets.
Contract No. 20240283 Attachment C - MONTHLY PREVENTATIVE MAINTENANCE TASKS 2 of 5.
.
Item 8 Page 153 of 221
INTERSECTION RECORDS:
Ensure that all intersection cabinet wiring diagrams are present. Notify City representative if
updates are required. Note all work, routine and extraordinary, in the log in the cabinet as to the
reason for the call/work and results or work accomplished by date and time.
CONTROLLER OPERATION:
Manually place vehicle and pedestrian calls on each phase through the cabinet test switches or
the controller key pad, to verify controller servicing of each active phase. Check controller logs
for any faults that may have occurred and take notes for the file.
CONFLICT MONITOR MALFUNCTION MANAGEMENT UNIT:
Verify time and dates are correct in any CMU/MMU with an intema1 clock and for proper
operation of the unit.
DETECTOR OPERATION:
Verify the detection zones for each detector by observing the turn-on of the appropriate detector
indicator as a vehicle passes over the detector loop(s) or detection zone. Check also that a call is
placed on the correct controller phase. Verify detection zone vertically above loops whenever a
problem has occurred.
EQUIPMENT DISPLAYS AND INDICATORS:
Verify that all video, LED and LCD displays and indications on all cabinet equipment are
working properly.
SYSTEM TELEMETRY:
Check operation of telemetry on controller display and modem, if equipped, located in the
cabinet. Report any malfunction immediately.
EMERGENCY VEHICLE PREEMPTION (EVP):
Verify that the EVP is operating with the use of a strobe light. Report any malfunction
immediately (Completed every 90 days).
INTERSECTION WALK-AROUND:
GENERAL:
Remove any easily removed, unauthorized signs and posters and report all graffiti existing on
signal poles or equipment.
SIGNAL HEADS:
Verify that all vehicle and pedestrian signal heads properly display all indications and the signals
are not damaged. Verify the alignment of all heads to the intended direction. Also verify that all
backplates, visors and doors are visibly secure.
Contract No. 20240283 Attachment C - MONTHLY PREVENTATIVE MAINTENANCE TASKS 3 of 5.
.
Item 8 Page 154 of 221
PEDESTRIAN EQUIPMENT:
Check all pedestrian push buttons and signals by band to ensure that they are securely mounted
and operating properly. Contractor will maintain a supply of ADA push buttons, as these are to
be repaired immediately on discovery and reported to City staff.
MISCELLANEOUS:
Check operation of safety lighting using the manual test switch located in the service cabinet
Visibly check all signal-mounted signs and advance warning signs/beacons for deterioration,
proper mounting, alignment and operation; Verify that all pullbox covers, hand hole covers, etc.
are secured and not damaged or missing. Check all detector loops for sealant deterioration,
exposed wire, etc. Record any problems or irregularities and take corrective action as soon as
possible, for contractor provided services. Visibly check pullboxes for evidence of ants and
gophers. Report any positive findings.
LAMPS AND LIGHTING:
When a vehicle or pedestrian indication is found to be out and the lamp and module is damaged,
defective or past its useful life, the lamps/module shall be replaced without charge for labor or
equipment using Dialight LED Ball Signal Modules (8 inch and 12 inch) and shall be fully
compliant to the ITE VTCSH LED Circular Supplement specifications dated and adopted June
27, 2005. All Countdown Pedestrian Signals shall be replaced when needed with Dialight
(16x18), part number 430-6479-001X. Contractor shall replace internally Illuminated Street
Name Sign lamps as they become dim or inoperative. ISNS lamps shall be F72T2 Cool White
Fluorescent lamps meeting the requirements of ANSI STD. C78. The Contractor shall during the
1st of this month clean and polish all lenses and reflectors including illuminated street name
signs and safety lights. The contractor shall replace burned out lamps as they occur under extra
work charges.
ANNUAL CONFLICT MONITOR TESTING:
Replace conflict monitor's (CMU's, MMU's) with a spare unit and submit the monitors for
testing and certification. It is suggested that ten (10) monitors be replaced and the originals be
submitted for testing and certification on a rotating basis over 11 months. Printed certification is
to be provided for each conflict monitor/malfunction management unit. The contractor will have
available 6 spare MMU's and 4 spare CMU's for rotation use in testing. Testing of conflict
monitors shall be included in price proposal for routine maintenance.
PAINTING:
Contractor shall repaint all metal standards, signal heads, back plates, visors, and controller
housing (if already painted) on the second year of the contract, unless directed otherwise by the
City. Repainting shall be completed in June and shall be conducted by spray painting methods.
Colors as specified by the City. For those controller cabinets that have metal finishes, the
Contractor shall wipe clean controller with detergent. Detergent per manufacturer's requirements.
Contract No. 20240283 Attachment C - MONTHLY PREVENTATIVE MAINTENANCE TASKS 4 of 5.
.
Item 8 Page 155 of 221
ROUTINE EMERGENCY SERVICES:
The Contractor shall maintain a twenty-four (24) hour per day emergency service for the
replacement of burned-out signal and safety lamps, adjustment of turned heads, repair of
controller malfunctions or any damage creating a public hazard. The Contractor shall repair
parts, replace parts and lamps, and otherwise keep the traffic signals in good working condition.
This telephone number is to be made available to all persons designated by the City.
The Contractor shall make immediate service calls on an emergency basis, responding within
two (2) hours in the event of malfunctions of the controller or signal system or turned head. The
replacement of burned-out signal lamps, internally illuminated street name sign lamps, or safety
lights need not be on an emergency basis provided that there are at least two (2) indications still
operative for each direction of travel. Such replacements shall be handled on the next business
day but in no case more than 48 hours. All labor, materials, equipment, travel, and parts for
routine emergency service shall be included in the routine maintenance proposal price per
signalized intersection per month, and no additional compensation will be allowed.
Contract No. 20240283 Attachment C - MONTHLY PREVENTATIVE MAINTENANCE TASKS 5 of 5.
.
Item 8 Page 156 of 221
NOTICE INVITING BIDS
for
Citywide Traffic Signal Maintenance & Repair FY2024
in the
City of Vernon
One original sealed bid must be signed and submitted prior to 2:00 p.m., Wednesday, March 6,
2024 to the City Clerk’s Office, City of Vernon, 4305 Santa Fe Avenue, Vernon, CA 90058,
(“Bid Deadline”).
All bids shall be enclosed in sealed envelopes, distinctly marked “Bid” with the title of the
bid and the bidder’s name and address appearing on the outside.
Bids shall be clearly titled and should be mailed or delivered in person before 2:00 p.m. on the
Bid Deadline. LATE SUBMITTALS WILL NOT BE ACCEPTED. Bids will be opened in
the City Clerk’s Office at 2:00 p.m. on Wednesday, March 6, 2024. At the bid opening, the
City Clerk shall open bid packages and acknowledge the receipt of Bids. Once all Bid Packages
are opened and announced, the contents (collectively, the “Completed Bid Forms” and the
uncompleted forms, the “Bid Forms”) will be made available for public review. Except as set
forth in Paragraph 22 (“Public Records”), the Completed Bid Forms, once removed from the Bid
Packages by the City Clerk, will be a matter of public record.
Bid Documents, Plans and Specifications are available at no charge at
www.cityofvernon.org/planetbids.
Pre-Bid Meeting:
A pre-bid meeting to answer any questions regarding the project plans and specifications is
scheduled for 10:30 a.m. on Wednesday, February 28, 2024 in the Public Works Department,
4305 Santa Fe Avenue, Vernon, California. This meeting is to answer any questions regarding
the project plans and specifications.
Attendees must adhere to the State and local guidelines regarding COVID-19, including
applicable industry guidelines for construction sites. Attendance is not mandatory.
City of Vernon Contact Person:Public Works Department
Attention: Lissette Melendez, Project Engineer
Phone: (323) 583-8811 ext. 246
Email: lmelendez@cityofvernon.org
Page 7 of 182
.
.
Item 8 Page 157 of 221
Mandatory Qualifications for Bidder and Designated Subcontractors:
A Bid may be rejected as non-responsive if the Bidder fails to meet the essential requirements for
qualification.
General Scope of Work:
Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform
work involved in the Project. The Work in the Bid is defined in the Project Drawings and
Specifications and will generally include the following:
Ongoing and regular field preventative maintenance and repair of traffic signal equipment, as
further described in the special provisions, and other related equipment by truly trained and
qualified personnel. In addition, the Contractor shall provide Emergency Service response for the
repair of the City’s forty-two (42) signalized intersections on a 24-hour a day, 7 days per week
basis, including all holidays.
In the event of any conflicts, refer to the Procedure of Contract Documents” contained in General
Conditions, Section 1.10.
Mandatory Qualifications for Bidder and Designated Subcontractors:
A Bid may be rejected as non-responsive if the Bid fails to document that Bidder meets the
essential requirements for qualification. As part of the Bidder’s Statement of Qualifications,
each Bid must establish that:
Bidder satisfactorily completed at least three (3) prevailing wage public contracts in California;
each comparable in scope and scale to this Project, within three (3) years prior to the Bid
Deadline and with a dollar value in excess of the Bid submitted for this Project.
Other Bidding Information:
1.Contract Time: This Work must be completed within 1,095 calendar days from the date
of commencement as established by the City’s written Notice to Proceed.
2.
3.
Amount of Liquidated Damages:
a. $200 per hour late on emergency call-outs.
b. $500 for each day past the first and last seven (7) working days of the month of non-
completion of the preventative maintenance.
Intermediate Completion Milestones
- Contractor shall perform Monthly Maintenance to half of the signalized intersections
listed in Attachment B during the first seven (7) working days of each month and the
other half during the last seven (7) working days of each month.
4.
5.
Bidding Documents. Bids must be made on the Proposal Form contained herein.
Engineer’s Estimate. An Engineer’s Estimate of the cost of construction of this Work has
Page 8 of 182
.
.
Item 8 Page 158 of 221
been prepared. Said estimate is in the range of $43,000 to $49,000 per year.
6. Acceptance or Rejection of Bids. The City reserves the right to reject any and all bids, to
award all or any individual part/item of the bid, and to waive any informalities, irregularities or
technical defects in such bids and determine the lowest responsible bidder, whichever may be in
the best interests of the City. No late bids will be accepted, nor will any oral, facsimile or
electronic bids be accepted by the City.
7.Contractor’s License. At the time of the Bid Deadline and at all times during
performance of the Work, including full completion of all corrective work during the Correction
Period, Contractor must possess a California contractor’s license or licenses, current and active,
of the classification required for the Work, in accordance with the provisions of Chapter 9,
Division 3, Section 7000 et seq. of the Business and Professions Code. In compliance with
Public Contract Code Section 3300, the City has determined that the Bidder must possess the
following license(s): C-10, Electrical Contractor, and D-31, Pole Installation and
Maintenance Contractor from the California State License Board as applicable to such
self-performed Work. Contractor may substitute the D-31 license for a Class A, General
Engineering Contractor’s License. The Bidder will not receive a Contract award if at the time
of submitting the bid, the Bidder is unlicensed, does not have all of the required licenses, or one
or more of the licenses are not current and active. If the City discovers at the time of the Bid
Deadline that Contractor is unlicensed, does not have all of the required licenses, or one or more
of the licenses are not current and active, the City may reject the Bid, cancel the award, declare
the Bid Bond as forfeited, keep the Bid Bond’s proceeds, and exercise any one or more of the
remedies in the Contract Documents in addition to those provided by law.
8.Subcontractors’ Licenses and Listing. Bidders must list each Subcontractor whom the
Bidder must disclose under Public Contract Code Section 4104 (Subcontractor Listing Law), and
the Bidder must provide all of the Subcontractor information that Section 4104 requires (name,
address, license number, public works contractor registration number issued pursuant to Labor
Code Section 1725.5, and portion of the Work). An inadvertent error in the license number or
public works contractor registration number will not be considered nonresponsive if corrected
within 24 hours after the bid opening. In addition, the City requires the Bidder to list the dollar
value of each Subcontractor’s labor or services. The City reserves the right to review and
disqualify any proposed Subcontractor. The City’s disqualification of a Subcontractor does not
disqualify a Bidder. In such case, prior to and as a condition to award of the Contract, the
successful Bidder shall substitute a properly licensed and qualified Subcontractor— without an
adjustment of the Bid Amount. At the time of the Bid Deadline and at all times during
performance of the Work, each listed Subcontractor’s license must be current and active for the
portion of the Work listed and shall hold all specialty certifications required for such Work.
9.Permits, Inspections, Plan Checks, Governmental Approvals, Utility Fees and Similar
Authorizations.
Unless specified otherwise, all Governmental Approvals and Utility Fees shall be obtained and
paid for by Contractor and will be reimbursed based on Contractor’s actual direct cost without
markup.
10.Bid Forms and Security: Each Bid must be made on the Bid Forms obtainable at
www.cityofvernon.org/planetbids or at the Public Works Department. Each Bid shall be
accompanied by a cashier’s check or certified check drawn on a solvent bank, payable to “City of
Page 9 of 182
.
.
Item 8 Page 159 of 221
Vernon,” for an amount equal to ten percent (10%) of the total maximum amount of the Bid.
Alternatively, a satisfactory corporate surety Bid Bond for an amount equal to ten percent (10%)
of the total maximum amount of the Bid may accompany the Bid. Said security shall serve as a
guarantee that the successful Bidder will, within fifteen (15) calendar days after the date of the
award of the contract, enter into a valid contract with the City for said Work in accordance with
the Contract Documents.
11.Bid Irrevocability. Bids shall remain open and valid for ninety (90) calendar days after
the Bid Deadline.
12.Substitution of Securities. Pursuant to California Public Contract Code Section 22300,
substitution of securities for withheld funds is permitted in accordance therewith.
13.Prevailing Wages. This Project is a “public work” as defined in California Labor Code
Section 1720. Contractor awarded this Contract and all Subcontractors of any tier shall not pay
less than the minimum prevailing rate of per diem wages for each craft, classification, or type of
worker needed to perform the Work. The Director of Industrial Relations of the State of
California, pursuant to the California Labor Code, and the rates determined by the California
Director of Industrial Relations are available online at www.dir.ca.gov/DLSR/PWD/.
14. Payroll Records. Pursuant to SB 854, Contractor and any Subcontractors shall furnish
electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor
Standards Enforcement).
15. Registration with the Department of Industrial Relations (DIR). No contractor or
subcontractor may be listed on a bid proposal for a public works project unless currently
registered and qualified (including payment of any required fee) with the DIR pursuant to Labor
Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under
Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for
public work on a public works project unless currently registered and qualified (including
payment of any required fee) with the DIR pursuant to Labor Code section 1725.5. This project
is subject to compliance monitoring and enforcement by the DIR.
Carlos Fandino
City Administrator
Dated: ___________ (Approved as to form by the City Attorney’s Office)
Published: _______
Page 10 of 182
.
.
Item 8 Page 160 of 221
City of Vernon
Instructions for Bidders
Project: Citywide Traffic Signal Maintenance & Repair FY 2024
for the Department of Public Works
City personnel with whom prospective bidders will deal with are:
Lissette Melendez, Project Engineer, Public Works Department, 4305 Santa Fe Avenue, Vernon,
CA 90058 (323) 583-8811 ext. 246
Bid opening date and time: Wednesday, March 6, 2024, at 2:00 p.m. (“Bid Deadline”).
Bids will be received and opened at the Office of the City Clerk, 4305 Santa Fe Avenue, Vernon,
CA 90058.
The bid must be received by the City Clerk’s Office prior to the time set for bid opening. A bid
received by the City Clerk’s Office after the time set for the bid opening is a non-responsive bid
and shall not be considered.
GENERAL BID REQUIREMENTS
To be considered, a bidder must strictly follow the format for bids in the specifications. Bids must
be binding and firm. Any bids may be withdrawn before bid opening, but bids shall remain open
and valid for ninety (90) calendar days after the Bid Deadline.
1.CONTRACTORS LICENSE
The Bidder must possess a valid State of California Contractors License and must list type
in the classification(s) specified in the Notice Inviting Bids at the time of the Bid Deadline
and at all times during the performance of the Work, except as otherwise provided in
California Business and Professions Code Section 7028.15.
2.INTERPRETATION OF BIDDING DOCUMENTS, SPECIFICATIONS AND
ADDENDA
A.If any Bidder contemplating submitting a Bid is in doubt as to the true meaning of
any part of the Bidding Documents, or who finds discrepancies, errors or omissions
therein or who finds variances in any of the Bidding Documents with applicable
law, such Bidder shall at once submit a written request for an interpretation or
correction thereof to the City’s representative identified in the Notice Inviting Bids,
or other designated individual. All Bidders shall submit such written requests to
City not less than ten (10) calendar days prior to the Bid Deadline. The person or
entity submitting the request shall be responsible for its prompt delivery to City’s
Contact Person identified in the Notice Inviting Bids.
Any interpretation or correction will be made only by Addendum issued by the City
and a copy of such Addendum will be delivered to all Interested Bidders of record.
Page 11 of 182
.
.
Item 8 Page 161 of 221
Any Addenda so issued must be acknowledged in the Bid and the cost of
performing Work described in the Addenda shall be included in the Bid. Bidder’s
failure to acknowledge receipt of all Addenda may result in rejection of the Bid as
nonresponsive. No person is authorized to render an oral interpretation or correction
of any Bidding Documents and no Bidder may rely on any such oral interpretation
or correction issued by the City. The City shall not be responsible for any other
explanation or interpretation of the Drawings or Specifications, or for any oral
instructions. City reserves the right to extend the Bid Deadline by issuing an
Addendum to Interested Bidders no later than 72 hours prior to the Bid Deadline.
Bidders shall use complete sets of Bidding Documents in preparing Bids; City shall
not assume responsibility for errors or misinterpretations resulting from the use of
incomplete sets of Bidding Documents.
B.Addenda will be made available for inspection at
www.cityofvernon.org/planetbids. Each Bidder shall ascertain prior to submitting
a Bid that the Bidder has received all Addenda issued and the Bidder shall
acknowledge their receipt in the Bid.
3.
4.
OBTAINING DRAWINGS AND DOCUMENTS
Bidder may secure Bidding Documents only from the location specified in the Notice
Inviting Bids. City will maintain a list of persons who obtained a copy of these
Specifications (“Interested Bidders”). Only Interested Bidders will receive Addenda, if so
issued.
BID FORMS – SUBMITTAL
A.
B.
The Bids shall be made on the forms provided herein with all blank spaces properly
filled in.
The phraseology shall not be changed, and no additions shall be made to the items
mentioned herein. Unauthorized conditions, exemptions, limitations, or provisions
attached to a Bid will render it informal and may cause its rejection. All forms
requiring specific information shall be completed with all applicable information
for a Bid to be considered responsive.
C.
D.
Include all Bid Forms, properly executed, and intact on forms provided. Enclose
the Bid Forms in a sealed envelope; type or print on the envelope "BIDS for"
followed by the title and Specification Number and the date and time of the Bid
Deadline, and the Bidder's name and address. The envelope may be mailed, hand
delivered, or delivered by courier or package delivery service.
One Original Bid shall be hand delivered, delivered by courier or package delivery
service to the Office of the City Clerk, City of Vernon, 4305 Santa Fe Avenue,
Vernon, CA 90058.
Page 12 of 182
.
.
Item 8 Page 162 of 221
E.Bids received after the Bid Deadline or at any place other than the Office of the
City Clerk will not be considered.
5.BID FORMS – AUTHORIZED SIGNATURES
A.The full name, business address, zip code, and business telephone number, with
area code of the individual, partnership, joint venture, or corporation submitting the
Bid shall be typewritten or legibly printed on the Bid Forms. The Bidder shall sign
the form with his/her usual wet ink signature.
B.
C.
Sole Proprietorship: An individual shall sign.
Partnership (General or Limited): A partner shall sign for a partnership; the
partner shall give the names and addresses of all partners.
D.Corporation: An officer shall sign for a corporation. The corporate name must be
attested by the corporate seal. The names and titles of the president and all officers
of the corporation who are authorized to sign the Bid Forms must be listed in an
authenticated Incumbency Certificate signed by the corporate secretary.A
signature other than a corporate officer’s will be accepted only if an authenticated
Incumbency Certificate is attached.
E.Joint Venture: Bidders shall use the appropriate section(s) listed above in B-D,
based on their applicable situation.
6.BID FORMS – SCHEDULE OF BID PRICES
A.The Bidder shall include in his/her Bid price(s) any and all expense or costs that
may be necessary to complete the project in accordance with the requirements of
the Contract. The cost of all mobilization, preparatory work and operations for the
multiple movements of personnel, equipment, supplies, and incidentals to the
various project sites must be included in the various bid items, and no extra
compensation will be paid to Contractor.
B.The Bidder shall state for each item on the Schedule of Bid Prices form, in clearly
legible figures, the Base Bid, the alternates, and the unit price and item total or lump
sum, as the case may be, for which he/she proposes to supply labor, materials, and
equipment and to perform the Work. Bids must not contain any erasures,
interlineations, strike-throughs or other corrections unless the same are suitably
authenticated by affixing in the margin immediately opposite such erasure or
correction the initials of the person(s) signing the Bid. If any Bid, or portion
thereof, is determined by the City to be illegible, ambiguous or inconsistent, City
may reject such a Bid as being non-responsive.
C.In the case of a unit price item, the amount set forth, as the item total shall be the
product of the estimated quantity times the unit price Bid. In the event of a
discrepancy between the unit price Bid and the item total, the unit price shall
Page 13 of 182
.
.
Item 8 Page 163 of 221
prevail; however, if the unit price is ambiguous, unintelligible, or uncertain for
any cause, or is omitted, or is the same amount as the entry for the item total, then
the item total shall prevail and shall be divided by the estimated quantity for the
item and the price thus obtained shall be the unit price. Where so indicated by the
makeup of the Bid Form, sums shall be expressed in both words and figures, and
in case of discrepancy between the two, the amount written in words shall govern.
D.All requested Alternates, if any, shall be Bid. See the Schedule of Bid Prices for
more information and the list of Bid Alternates, if any. If no change in the Base
Bid is required, enter “No Change.”
7.BID SECURITY
A.
B.
Each Bid shall be accompanied by cash or a cashier’s check or a certified check,
drawn on a responsible bank doing business in the United States payable to the
City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as a
principal and a California admitted surety company (as defined by California Code
of Civil Procedure §§995.120 and 995.311) as surety (“Bid Security”).
All bonds must be issued by a California admitted surety insurer with the minimum
A.M Best Company Financial strength rating of “A:VII” or better. Bonds issued
by a California admitted surety not listed on Treasury Circular 570 will be deemed
accepted unless specifically rejected by the City. Bonds issued from admitted
surety insurers not listed in Treasury Circular 570 must be accompanied by all
documents enumerated in California Code of Civil Procedure Section 995.660. All
such bonds must be accompanied by a power of attorney from the surety company
authorizing the person executing the bond to sign on behalf of the company. If the
bonds are executed outside the State of California, all copies of the bonds must be
countersigned by a California representative of the surety. The signature of the
person executing the bond on behalf of Surety must be acknowledged by a Notary
Public as the signature of the person designated in the power of attorney.
C.Bid Security shall be in an amount not less than 10% of the Base Bid. Any Bid
submitted without Bid Security will be rejected as non-responsive. The Bid
Security shall be given as a guarantee that the successful Bidder will execute the
Contract and will provide the insurance, bonds and other required forms within
fourteen (14) calendar days after award of the Contract. Bidders will be entitled to
return of Bid Security except when a successful Bidder forfeits its Bid Security. A
forfeit may occur, for example, if the successful Bidder withdraws its Bid prior to
the expiration of ninety (90) calendar days after award of the Contract; attempts to
withdraw its Bid when the requirements of Public Contract Code § 5101 et seq. are
not met; or refuses or fails to execute the Contract and provide the required bonds,
insurance or certificates within fourteen (14) calendar days after award of the
Contract. In any one or more of these events, if City awards the Contract for the
Work to the next lowest responsible Bidder, the amount of the original lowest
Bidder’s security shall be applied to the Contract Price differential between the
lowest Bid and the second lowest Bid. Any surplus will be returned to the original
Page 14 of 182
.
.
Item 8 Page 164 of 221
lowest Bidder. If the City rejects all other Bids presented and re-advertises, the
lowest Bidder’s Bid Security may be used to offset the City’s cost of re-advertising
and receiving new Bids. In that case, the surplus if any, will be returned to the
original lowest Bidder.
D.The Bid Security shall be held for ninety (90) calendar days after the award of the
Contract or until posting by the successful Bidder of the payment and performance
bonds, proof of insurance, return of executed copies of the Contract and necessary
certification(s), whichever first occurs, after which time the Bid Security will be
returned to all Bidders.
E.
F.
If a Bid Bond is to be submitted, Bidder shall use the form entitled "Bid Bond"
contained in the Bidding Documents, which Bid Bond shall be properly executed
and acknowledged by the Bidder and by a corporate surety authorized to transact
such business in the State of California.
Any alteration of said form of Bid Bond, or imperfection in the execution thereof,
as herein required, will render it informal and may, at the option of the City, result
in the rejection of the Bid under which the Bid Bond is submitted.
8.BIDDER'S AND SPECIALTY CONTRACTORS’ STATEMENTS OF
QUALIFICATIONS
A.Each Bidder shall be required to complete, execute and submit with its Bid, the
form entitled "Bidder's Statement of Qualifications." Notwithstanding the
provisions of Paragraph 22 herein, the Bidder’s Statement of Qualifications shall
not be public records. All information required by a Bidder’s or Specialty
Contractor Statement of Qualifications shall be completely and fully provided. If
no information is to be filled in a blank space, then write "none." Any Bid not
accompanied by a Bidder’s Statement of Qualifications form completed with all
information required may render the Bid non-responsive. If the City determines
that any information provided by a Bidder in the Bidder’s Statement of
Qualifications is false or misleading, or is incomplete so as to be false or
misleading, the City may reject the Bid submitted by such Bidder as being non-
responsive.
B.A responsible Bidder is a Bidder who has demonstrated the attribute of
trustworthiness, as well as quality, fitness, capacity and experience to satisfactorily
perform fully the requirements of the contract documents. In selecting the lowest
responsible Bidder, consideration will be given not only to the Bidder’s financial
standing but also to the general competency of the Bidder for the performance of
the work covered by the Bid including, but not limited to, the experience of the
Bidder in construction of public buildings for public agencies. By submitting a
Bid, each Bidder agrees that the City, in determining the successful Bidder and its
eligibility for the award, may consider the Bidder’s experience with similar types
of construction projects and facilities, conduct and performance under other
Page 15 of 182
.
.
Item 8 Page 165 of 221
contracts, financial condition, reputation in the industry, and other factors which
could affect the Bidder’s performance of the work.
9.DESIGNATION OF SUBCONTRACTORS
A.Subcontractor Listing. On the Designation of Subcontractors form, the Bidder shall
list each Subcontractor whom the Bidder must disclose under the Subletting and
Subcontracting Fair Practice Act, Public Contract Code Section 4104. The Bidder
shall provide: each Subcontractor’s name, the trade and type of work that the
Subcontractor will perform, the location (address) of the Subcontractor’s place of
business, each Subcontractor’s license number, each Subcontractor’s public works
contractor registration number, and the dollar value of each Subcontractor’s labor
or services. If additive Alternate Bid Items are included in the Bidding Documents,
the Bidder shall identify each Subcontractor performing additive Alternate Bid
Items, when such Work or the combination of base Contract Work and Alternate
Work exceeds one-half of one percent of the total Bid Amount.
B.
C.
Subcontractors’ Licenses. At the time of the Bid Deadline and at all times during
performance of the Work, each listed Subcontractor shall possess a current and
active California Contractor’s license appropriate for the portion of the Work listed
for such Subcontractor and hold all specialty certifications required for such Work.
Disqualification of a Subcontractor. The City has the right to review the suitability
and qualifications of any Subcontractor proposed by the Bidder. As part of this
review, the City may request a Bidder to submit additional information about one
or more of the listed Subcontractors including, but not limited to a statement
detailing the Subcontractor’s experience with pertinent information as to similar
projects and other evidence of the Subcontractor’s qualifications. If requested, the
Bidder shall provide the information to the City within the time specified in the
City’s written request. After due investigation, if the City has a reasonable
objection to any proposed Subcontractor, the City may, before giving the notice of
award, require the apparent successful Bidder to submit an acceptable substitute.
The City’s disqualification of a Subcontractor does not disqualify a Bidder.
However, prior to and as a condition to award of the Contract, the successful Bidder
shall substitute a properly licensed and qualified Subcontractor without an
adjustment of the Bid Price.
D.Work of Subcontractors. The organization or arrangement of the Specifications
and Drawings do not limit the extent of the Work for the Contract Documents.
Accordingly, all Bidders are encouraged to disseminate all of the Specifications,
Drawings and other Contract Documents to all persons or entities submitting sub-
bids to the Bidder. The omission of any portion or item of Work from the Bid or
from sub-bids, which is reasonably inferable from the Contract Documents, will
not be a basis for adjustment of the Contract Price or the Contract Time.
Page 16 of 182
.
.
Item 8 Page 166 of 221
E.Ineligible Subcontractors. The successful Bidder is prohibited from performing
Work on the Project with any Subcontractor who is ineligible to perform work on
a public works project pursuant to California Labor Code Sections 1777.1 or
1777.7. In submitting its Bid, the Bidder certifies that it has investigated the
eligibility of each and every listed Subcontractor and has determined that none is
ineligible to perform work pursuant to the above code provisions.
10.
11.
CONTRACTOR’S AFFIDAVIT OF NON-COLLUSION
An Affidavit of Non-Collusion in the form provided by the City shall be signed under
penalty of perjury, certifying that the Bid is not the result of and has not been influenced
by collusion. Bidder shall submit this form with its Bid. Any Bid made without such
affidavit, or believed to be made in violation of the requirements set forth in the affidavit
form, may be rejected.
INSURANCE REQUIREMENTS
The Bidder shall submit to its insurance company or insurance agent the Insurance
Requirements in this Specification and the Contract Documents. The insurance company’s
underwriter or agent must complete the Insurance Requirements documentation which
states that the insurer’s underwriter or agent will furnish the City with the required
insurance documents within fourteen (14) days after the Bidder’s having been notified of
the Contract’s award. The Bidder shall submit this form with its Bid. Any Bid made
without this statement, or made with an incomplete statement, may be rejected.
12.EXAMINATION OF DRAWINGS, SPECIFICATIONS, AND SITE OF WORK
A.The Bidder shall examine carefully the site of the Work contemplated and the
Drawings and Specifications. The submission of a Bid will be conclusive evidence
that the Bidder has investigated and is satisfied as to the conditions to be
encountered, as to the character, quality, and quantities of Work to be performed
and materials to be furnished, the difficulties to be encountered, and to the
requirements of the Drawings, Specifications, and other Contract Documents. The
Bidder shall ascertain the locations of the existing utility services, and other
underground facilities, and provide for carrying out its operations so as to cause the
minimum possible inconvenience to the occupants of properties along any streets
affected. All Work and costs involved in the safeguarding of the properties of
others shall be at the expense of the Bidder to whom the Contract may be awarded.
B.The Bidder hereby certifies that it has examined the local conditions, has read each
and every clause of the Contract Documents, and that it has included all costs
necessary to complete the specified Work in its Bid prices, and the Bidder agrees
that if it is awarded the Contract, it will make no claim against the City based upon
ignorance of local conditions or misunderstanding of any of the provisions of the
Contract. Should the conditions turn out otherwise than the Bidder anticipated, the
Bidder agrees to assume all risks incident thereto.
Page 17 of 182
.
.
Item 8 Page 167 of 221
13.PRICES AND PAYMENTS
Approximate quantities listed in the Schedule of Bid Prices are estimates given for
comparing Bids, and no claim shall be made against the City for excess or deficiency
therein, actual or relative. Payment at the prices agreed upon will be in full for the
completed Work and will cover materials, supplies, labor, tools, equipment, and all other
expenditures incident to a satisfactory compliance with the Contract, subject to all
applicable provisions in the Contract and General Conditions.
14.
15.
PERMIT FEES
If provided in the General Conditions, Contractor shall be reimbursed for the actual direct
cost of all Permit Fees, as defined in Paragraph 1.01 and addressed in 1.03 of the General
Conditions. Bidder shall exclude the cost of Permit Fees from Bidder’s Base Bid sum;
Base Bid sum shall include the cost of administration and coordination for all
Governmental Approvals and Utility Fees.
SUBSTITUTIONS
No requests for substitution of any material, device, product, equipment, fixture, form, or
type of construction shall be considered by City prior to award of the Contract. Bidders
shall submit all requests for substitution and substantiating data, within seven (7) calendar
days from the date of the Notice to Proceed. Bidder shall refer to the appropriate provisions
of the General Conditions for additional information regarding substitutions.
Authorization of a substitution is solely within the discretion of the City.
16.
17.
RETURN OF IMPROPER BIDS
Bids submitted after the Bid Deadline are non-responsive and shall be returned to the
Bidder unopened. Oral, telephonic, telegraphic, facsimile or electronically transmitted
Bids shall not be considered unless the Notice Inviting Bids expressly permits such means
of transmittal.
WITHDRAWAL OF BIDS
Bidder may withdraw its Bid either personally or by written request any time prior to the
scheduled Bid Deadline by notice to the City’s Contact Person designated in the Notice
Inviting Bids. If such notice is written, it shall be signed by the Bidder and shall be date-
stamped and time-stamped by the City upon receipt. Withdrawn Bids may be resubmitted
before the Bid Deadline provided that they are in full conformance with these Instructions
to Bidders. Once submitted, all Bids are irrevocable, except as otherwise provided by law.
Requests for withdrawal of Bids after the Bid Deadline shall be made only in accordance
with California Public Contract Code § 5100, et seq. Bidder agrees by submitting a Bid
that such Bid shall remain open, is irrevocable, and may not be modified, withdrawn, or
cancelled for a period of ninety (90) days after award of the Contract.
Page 18 of 182
.
.
Item 8 Page 168 of 221
18.OPENING AND EVALUATION OF BIDS
A.Bid Opening and Tabulation. The Bids shall be opened and read in public after
the Bid Deadline has expired at the time and location listed in the Notice Inviting
Bids. A tabulation of all Bids received will be available for public inspection at the
Office of the City Clerk, 4305 Santa Fe Avenue, Vernon, CA 90058 during regular
business hours for a period of not less than thirty (30) calendar days following the
Bid Deadline. The City reserves the right to accept or reject any or all Bids and be
the sole judge regarding the suitability of the products, services or supplies offered;
and/or to waive any irregularities or informalities in any Bids or in the bidding
process. The City further reserves the right to purchase all or fewer than all items
or quantities of each item listed in the Bidding Documents. The award of the
Contract, if made by the City, shall be to the lowest responsive and responsible
Bidder. If Bid Alternate Items are called for, the lowest Bid shall be determined
according to Paragraph 20 below.
B.Evaluation of Bids.
1.Mandatory Qualifications. A Bid shall be rejected as non-responsive if the
Bidder fails to document in the Bid that Bidder meets the essential
requirements for qualification described in the Notice Inviting Bids. As part
of the Bidder’s Statement of Qualifications each Bidder must establish that
it, as the current entity: (1) has successfully completed at least three (3)
similar projects involving similar work within the last three (3) years with
a cost equal to or in excess of the Bidder’s Bid; and (2) has successfully
completed at least three (3) public works projects.
2.
3.
Responsive Bid. A responsive Bid is a Bid which conforms, in all material
respects, to the Bidding Requirements and Contract Documents.
Responsible Bidder. A responsible Bidder is a Bidder who has
demonstrated the attribute of trustworthiness, as well as quality, fitness,
capacity and experience to satisfactorily perform fully the requirements of
the Contract Documents.
4.Competency of Bidders. In selecting the lowest responsible Bidder,
consideration will be given not only to the financial standing but also to the
general competency of the Bidder for the performance of the Work covered
by the Bid including, but not limited to, the experience of the Bidder in
construction of public works for public agencies. By submitting a Bid, each
Bidder agrees that the City, in determining the successful Bidder and its
eligibility for the award, may consider the Bidder’s experience with similar
types of construction projects and facilities, conduct and performance under
other contracts, financial condition, reputation in the industry, safety record
and protocols and other factors which could affect the Bidder’s performance
of the Work.
Page 19 of 182
.
.
Item 8 Page 169 of 221
19.
20.
AWARD OF CONTRACT
The City reserves the right to reject any or all Bids and to waive any or all information or
technical defects, as the interest of the City may require. Award of Contract or rejection
of Bids will be made by the City within ninety (90) calendar days following the Bid
Opening.
BASIS OF AWARD
A.
B.
A Contract will be awarded to the lowest responsive and responsible Bidder
meeting all requirements set forth in these Bidding Documents.
City reserves the right in its sole discretion to select any, all, or none of the Bid
Alternates at the time of award of the Contract, regardless of whether such Bid
Alternates were used in the analysis to determine the lowest Bid.
21.EXECUTION OF CONTRACT
Within fourteen (14) calendar days after being notified by City that it has been awarded
the Contract, Contractor shall deliver to the City the following documents:
A.
B.
C.
One executed Contract in the form included herein, properly executed by
Contractor and, if Contractor is a corporation, evidence of its corporate existence
and that the persons signing the Contract are authorized to do so. All signatures
must be notarized.
Properly executed copies of the (a) Performance Bond, (b) Labor and Material
(Payment) Bond and (c) Maintenance Bond in accordance with the requirements
set forth in Article 13 of the General Conditions and in the form shown on Exhibits
1, 2 and 3 attached thereto. All signatures must be notarized.
Properly executed policies of all of the following: (a) the Commercial General
Liability Insurance, (b) the Automotive Liability Insurance, and (c) Professional
Liability, if required, and (e) the corresponding endorsements for each policy in
accordance with the requirements set forth in Article 12 of the General Conditions.
In the event that the fourteenth calendar day falls on Saturday, Sunday, a legal holiday for
the State of California, or on days when City Hall is closed, the aforesaid documents shall
be delivered by the following working day.
After receipt of said documents within said time period or any extension thereof granted
by the City, the City shall execute the Contract and return a fully executed copy to
Contractor for its files.
Page 20 of 182
.
.
Item 8 Page 170 of 221
22.PUBLIC RECORDS
City seeks to conduct its business openly. Except as set forth in paragraph 8.A., upon
opening, all Bids shall become a matter of public record and shall be regarded as public,
with the exception of those elements of each Bid that are identified by the Bidder and
plainly marked as “trade secret,” “confidential,” or “proprietary,” including any Statement
of Qualifications and financial statements to be submitted by Bidders. Each element of a
Bid which a Bidder desires not to be considered a public record must be clearly marked as
set forth above, and any blanket statement (i.e. regarding entire pages, documents, or other,
non-specific designations) shall not be sufficient and shall not bind the City in any way
whatsoever. If City receives a request from a third party to make a Bid available for
inspection and copying, the City will notify the Bidder of the request. If a Bidder instructs
the City that the information is not to be released, City will withhold the information,
provided, the Bidder expeditiously seeks a protective order from a court of competent
jurisdiction to prevent such release. If disclosure is required under the California Public
Records Act or otherwise by law (despite the Bidder’s request for confidentiality), the City
shall not in any way be liable or responsible for the disclosure of any such records or part
thereof.
Bidder shall indemnify, defend (including Bidder’s providing and paying for legal counsel
for City), and hold harmless City, its officers, agents, employees, and representatives from
and against all liability, claims, suits, demands, damages, fines, penalties, costs, or expenses
arising out of or alleging City’s refusal to publicly disclose one or more records that Bidder
identifies as protectable, or asserts is protectable.
23.PREVAILING WAGE RATES AND EMPLOYMENT OF APPRENTICES
A.Prevailing Wage Rates. The Bidder and all Subcontractors shall utilize the relevant
prevailing wage rate determinations in effect on the first advertisement date of the
Notice Calling for Bids in preparing the Bid Proposal and all component price
quotations, provided, however, that when Davis Bacon wage rates apply, such rates
are subject to increase by written notice, issued by Addendum not less than 10
calendar days before the Bid Deadline. Pursuant to California Labor Code Section
1770 et seq., the Director of the Department of Industrial Relations of the State of
California and the United States Secretary of Labor have determined the general
prevailing wage rates in the locality in which the Work is to be performed. Said
rate schedules are available from the City at its Public Works Department, which
shall be made available to any interested party upon request; or on the Internet at
www.dir.ca.gov/DLSR/PWD/. The wage rate for any classification not listed, but
which may be required to execute the Work, shall be commensurate and in accord
with specified rates for similar or comparable classifications for those performing
similar or comparable duties. To comply with California Labor Code Section
1773.2, Contractor shall post, at appropriate and conspicuous locations on the job
site, a schedule showing all applicable prevailing wage rates and shall also comply
with the requirements of California Labor Code Sections 1773 et seq.
Page 21 of 182
.
.
Item 8 Page 171 of 221
B.Apprenticeship Committee Contract Award Information. Pursuant to California
Labor Code § 1777.5 and Title 8 of the California Code of Regulations § 230,
Contractor and Subcontractors of any tier who are not already approved to train by
an apprenticeship program sponsor shall, within ten (10) calendar days of signing
the Contract or subcontract, as applicable, but in any event prior to the first day in
which Contractor or Subcontractor has workers employed on the Project, submit
the Public Works Contract Award Information form (DAS Form 140) to the
appropriate local apprenticeship committees whose geographic area of operation
include the area of the Project and who can supply apprentices to the Project. City
reserves the right to require Contractors and Subcontractors to submit a copy of
said forms to the City.
C.Statement of Employer Fringe Benefit Payments. Within five (5) calendar days of
signing the Contract or subcontract, as applicable, the Statement of Employer
Payments (DLSE Form PW 26) shall be completed for each Contractor and
Subcontractor of any tier who pays benefits to a third party trust, plan or fund for
health and welfare benefits, vacation funds or makes pension contributions. The
form must contain, for each worker classification, the fund, plan or trust name,
address, administrator, the amount per hour contributed and the frequency of
contributions. Training fund contributions shall also be reported in this form. City
reserves the right to require Contractors and Subcontractors to submit a copy of
said forms to the City.
D.Notice to Subcontractors. Bidders shall notify all potential Subcontractors
submitting price quotations for portions of the Work of the requirements concerning
payment of prevailing wage rates, payroll records, hours of Work, and employment
of apprentices.
24.REGISTRATION WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS
(DIR)
No contractor or subcontractor may be listed on a bid proposal for a public works project
unless currently registered and qualified (including payment of any required fee) with the
DIR pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement
for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor
may be awarded a contract for public work on a public works project unless currently
registered and qualified (including payment of any required fee) with the DIR pursuant to
Labor Code section 1725.5. This project is subject to compliance monitoring and
enforcement by the DIR.
25.SPECIAL CITY REQUIREMENTS
Special City forms and their instructions are an integral part of these specifications and
failure to submit same may be grounds, in the sole discretion of the City, for rejection of
any Bidder.
Page 22 of 182
.
.
Item 8 Page 172 of 221
A. Prevailing Wage Where Applicable. Upon request, certified payroll documents
shall be provided to the City.
B. Equal Employment Opportunity in Contracting. The City of Vernon is committed
to a policy of equal opportunity in contracting. Qualified firms including small
businesses and businesses owned by women, minorities, and disabled persons are
encouraged to submit bids or proposals. Contractors expressly agree to comply with
the City’s ordinances and regulations regarding Equal Opportunity Employment as
well as regulations that may be mandated by the source of the funds supporting the
Contract. Contractor certifies and represents that during the performance of this
Contract, it and any other parties with whom it may subcontract shall adhere to
equal employment opportunity practices to assure that applicants, employees and
recipients of service are treated equally and are not discriminated against because
of their age not discriminated against because of their race, religion, religious belief,
color, national origin, citizenship, ancestry, disability, sex, age, medical condition,
pregnancy, sexual orientation or marital status. Contractor certifies that it will not
maintain any segregated facilities.
Contractor shall comply with all applicable Federal and California laws including,
but not limited to, the California Fair Employment and Housing Act (California
Government Code Section 12900, et seq.), California Labor Code Section 1735,
and The Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.).
Contractor shall require like compliance by all Subcontractors employed on the
Work.
26.BID PROTEST PROCEDURES
A.Any Bidder submitting a Bid directly to the City and eligible for award of the
Contract may file a protest if the Bidder complies with all of the following
requirements and conditions:
1. The Bid protest is in writing;
2. A protest based upon alleged defects or improprieties in the Contract
Documents is filed with the City prior to the Bid Deadline;
3. All other protests are to be filed and received by the City no more than five (5)
calendar days following the City’s notice of intent to award the Contract; and
4. The written Bid protest sets forth, in detail, all grounds for the Bid protest,
including without limitation: all facts, supporting documentation, legal
authorities, and argument in support of the grounds for the Bid protest. All
factual contentions must be supported by competent, admissible, and credible
evidence.
Page 23 of 182
.
.
Item 8 Page 173 of 221
B.
C.
Any matters not set forth in the written Bid protest will be deemed waived. Any
Bid protest not conforming to the foregoing requirements and conditions will be
rejected by the City as invalid.
Bid Dispute Indemnification. In the event of a Bid dispute based upon the Bidder’s
submission of this Bid and the City acceptance of same, the Bidder shall indemnify,
defend (with counsel acceptable to City), and hold harmless the City, its City
Council members, employees, and agents from liability, claims, demands,
damages, and costs arising therefrom if such dispute or action arises solely upon
the award of a Contract in compliance with federal, state, and local laws.
[END OF DOCUMENT]
Page 24 of 182
.
.
Item 8 Page 174 of 221
BIDDING FORMS
Page 25 of 182
.
.
Item 8 Page 175 of 221
.
.
Item 8 Page 176 of 221
.
.
Item 8 Page 177 of 221
.
.
Item 8 Page 178 of 221
.
.
Item 8 Page 179 of 221
.
.
Item 8 Page 180 of 221
.
.
Item 8 Page 181 of 221
.
.
Item 8 Page 182 of 221
.
.
Item 8 Page 183 of 221
.
.
Item 8 Page 184 of 221
.
.
Item 8 Page 185 of 221
.
.
Item 8 Page 186 of 221
.
.
Item 8 Page 187 of 221
.
.
Item 8 Page 188 of 221
.
.
Item 8 Page 189 of 221
.
.
Item 8 Page 190 of 221
.
.
Item 8 Page 191 of 221
.
.
Item 8 Page 192 of 221
.
.
Item 8 Page 193 of 221
.
.
Item 8 Page 194 of 221
.
.
Item 8 Page 195 of 221
.
.
Item 8 Page 196 of 221
.
.
Item 8 Page 197 of 221
.
.
Item 8 Page 198 of 221
.
.
Item 8 Page 199 of 221
.
.
Item 8 Page 200 of 221
.
.
Item 8 Page 201 of 221
.
.
Item 8 Page 202 of 221
.
.
Item 8 Page 203 of 221
.
.
Item 8 Page 204 of 221
.
.
Item 8 Page 205 of 221
.
.
Item 8 Page 206 of 221
.
.
Item 8 Page 207 of 221
.
.
Item 8 Page 208 of 221
.
.
Item 8 Page 209 of 221
.
.
Item 8 Page 210 of 221
.
.
Item 8 Page 211 of 221
.
.
Item 8 Page 212 of 221
.
.
Item 8 Page 213 of 221
.
.
Item 8 Page 214 of 221
.
.
Item 8 Page 215 of 221
February 29, 2024
Via Planetbids
NOTICE TO BIDDERS – ADDENDUM No.1
CITYWIDE TRAFFIC SIGNAL MAINTENANCE & REPAIR FY2024
CONTRACT No. 20240283
This notice shall be considered as Addendum No. 1 to the Specifications for the above-
mentioned project and modifies the original Specifications and Contract Documents as noted
below. Portions of the Contract, not specifically mentioned in the Addendum, remain in force.
Contract Specifications:
1. “SCHEDULE OF BID PRICES”, Page 31-35 shall be replaced with the attached updated
sheets.
If you have any questions, please contact Lissette Melendez of my staff at
lmelendez@cityofvernon.org.
Sincerely,
Daniel Wall, P.E.
Director of Public Works
Enclosures
Public Works Department
4305 Santa Fe Avenue, Vernon, CA, 90058
CityofVernon.org
.
.
Item 8 Page 216 of 221
SCHEDULE OF BID PRICES
PROJECT: Citywide Traffic Signal Maintenance & Repair FY2024, Contract No. 20240283
BIDDER’S NAME: _________________________________________________
BASE BID
Pursuant to and in compliance with your Notice Inviting Bids and Contract Documents relating to the Project including
all Addenda (attach signed copies), Bidder, having become thoroughly familiar with the terms and conditions of the
Contract Documents and with local conditions affecting the performance and the costs of the Work at the place where
the Work is to be done, hereby proposes and agrees to fully perform the Work within the time stated in strict accordance
with the Contract Documents (including the furnishing of any and all labor, materials, tools, expendable equipment,
and utility and transportation services necessary to fully perform the Work and complete it in a workmanlike manner)
for the total Base Bid sum of:
________________________________________________ Dollars
Proposed Construction Costs Breakdown
($_____________________)
SECTION I – ROUTINE MAINTENANCE
Unit Price Per
Month
Total Cost
Per YearItem No.
1
Description Unit Qty
EA 42Routine Maintenance-Inspection and Cleaning
per Attachment “C”$$
SECTION II- EXTRAORDINARY MAINTENANCE
A. Material: Contractor’s cost for the supply plus (+) 15% per the Green Book
B. Labor: Contractor’s hourly rates (including all fringe benefits, markup, overhead, etc.) for all job
classifications involved in extraordinary maintenance.
C. Regular timer hours are Monday – Friday 7:00AM – 4:00PM (excluding Holidays). Overtime hours are
Monday – Friday 4:00PM – 7:00AM, Weekend and Holidays
Bid
Item
No.
Hours
Per
Year
5
Total Cost
Per YearClassification Title
Operations Superintendent
Unit Straight Time
2
3
4
5
6
7
8
HR
HR
HR
HR
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Foreman 5
Engineering/Systems Technician
Laboratory Technician
10
10
80
80
30
Traffic Signal Technician- Lead (IMSA Level III Certified) HR
Traffic Signal Technician- (IMSA Level II Certified)
Utility Technician
HR
HR
SUBTOTAL FOR BID ITEMS NO. 2 THROUGH NO. 8 $ _____________________________________
Page 31 of 182
.
.
Item 8 Page 217 of 221
Bid
Item
No.
Hours
Per
Year
Total Cost
Per YearClassification Title
Operations Superintendent
Unit Overtime
9 HR
HR
HR
HR
5 $
$
$
$
$
$
$
$
$
$
$
$
$
$
10 Foreman 5
11 Engineering/Systems Technician
12 Laboratory Technician
10
10
80
80
30
13 Traffic Signal Technician- Lead (IMSA Level III Certified) HR
14 Traffic Signal Technician- (IMSA Level II Certified)
15 Utility Technician
HR
HR
SUBTOTAL FOR BID ITEMS NO. 9 THROUGH NO. 15
Bid
$ _____________________________________
Qty Total Cost
Per YearItem
No.
Labor and Material Unit Per Unit Price
Year
16 Install 6’ diameter traffic loop (4 or less)
17 Install 6’ diameter traffic loop (more than 4)
18 Furnish and Install 6’ diameter bike loop (4 or less)
19 Furnish and Install 6’ diameter bike loop (more than 4)
20 Furnish and Install No. 5 pullbox
EA
EA
EA
EA
EA
EA
EA
EA
12
12
12
12
4
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
21 Furnish and Install No. 6 pullbox 4
22 Furnish and Install No. 5 pullbox lid 4
23 Furnish and Install No. 6 pullbox lid 4
Furnish and install LED Countdown Pedestrian Head-
(Dialight)24 EA
EA
EA
EA
EA
12
10
8
$
$
$
$
$
$
$25 Furnish and install ADA push button.
Furnish and install ADA push button assembly complete
with signs.26 $
27 Furnish and install pedestrian push button post 4 $
$Furnish and install handhole cover (Small Plastic oval or
rectangular).
Furnish and install handhole cover (Small Galvanized oval
or rectangular).
Furnish and install handhole cover (Large Plastic oval or
rectangular).
28
29
30
31
4
EA
EA
4
8
$
$
$
$
Furnish and install handhole cover (Large Galvanized oval
or rectangular).EA
EA
8
4
$
$
$
$32 Furnish and install 3 section 12” head on shaft
33 Furnish and install 5 section 12” head on shaft
34 Furnish and install 3 section 12” head on mast arm
EA
EA
2
2
$
$
$
$
Page 32 of 182
.
.
Item 8 Page 218 of 221
Furnish and install 5 section 12” doghouse with mast arm
mount35 EA 2 $$
36 Furnish and install 12” Tunnel Visor EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
4
4
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
37 Furnish and install NEMA conflict monitor
38 Furnish and install 24 volt power supply 4
39 Furnish and install 12” LED Red Ball (Dialight)
40 Furnish and install 12” LED Yellow Ball (Dialight)
41 Furnish and install 12” LED Green Ball (Dialight)
42 Furnish and install 12” LED Red Arrow (Dialight)
43 Furnish and install 12” LED Yellow Arrow (Dialight)
44 Furnish and install 12” LED Green Arrow (Dialight)
45 Furnish and install 72”x18” ISNS Panel (Green/White)
46 Install City furnished regulatory sign on signal mast arm
47 Replace Type 1-A (10’) pole.
24
8 $
24
4
$
$
$
$
$
$
$
$
2
4
12
50
4
48 Adjust alignment of signal head on mast arm.4
Furnish and install Type 332 cabinet. Cabinet and auxiliary
49 equipment shall conform to Caltrans specifications.
(8-phase intersection. Weekend Work)
Furnish and install Type P1 or M1 cabinet. Cabinet and
50 auxiliary equipment shall conform to Caltrans
specifications. (8-phase intersection. Weekend Work)
EA
EA
2
2
$
$
$
$
51 Furnish and install 170 ATC McCain controller
52 Furnish and install Cobalt Controller
EA
EA
EA
EA
EA
EA
2
2
$
$
$
$
$
$
$
$
$
$
$
$
53 Furnish and install model 2070LX Controller
54 Furnish and install Retroreflective Signal Backplate
55 90-Degree Elbow for vehicle signal
2
50
10
1256 Conduct Safety Light and ISNS Night Survey (Monthly)
SUBTOTAL FOR BID ITEM NO. 16 THROUGH NO. 56 (LABOR & MATERIAL) $ ___________________________
Page 33 of 182
.
.
Item 8 Page 219 of 221
Bid
Item
No.
Qty. Per
Year
Total Cost
Per YearEquipmentUnitUnit Price
57
58
59
60
61
62
63
Service Truck TRIP
TRIP
TRIP
TRIP
TRIP
TRIP
TRIP
80
120
5
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Bucket Truck
Hydraulic Boom Truck
Compressor with tools
Crane Truck
5
5
Concrete Saw 5
Towable Arrow Board 5
SUBTOTAL BID ITEM NO. 57 THROUGH NO. 63 (EQUIPMENT) $ __________________________
SECTION III- CONTRACT PROPOSAL COST SUMMATIONS
GRAND TOTAL BID ITEMS NO. 1 THROUGH NO 63 (USED FOR BID PURPOSES ONLY):
Dollars ($______________________)
Written Dollar Amount (Also, enter Total at top of page 32)
Bid is for comparison purposes. Actual pay to the Contractor for emergency work will be based on actual time and
materials based on unit prices provided. All unit prices shall include all overhead costs and profits.
All other work items, labor, materials, tools and incidentals which are not specifically listed in the above bid items, but
are necessary to complete the project per specifications, and all other applicable standards and codes are considered
to be included in the above bid items.
If there is a discrepancy between (1) the “Grand Total” shown immediately above, (2) any of the “total costs” shown in
the far right column above, or (3) the individual Unit Price, then the Unit price shall control over the total cost, and the
total cost shall control over the total. If, however, the unit price is ambiguous, unintelligible, or uncertain for any cause,
or is omitted, or is the same amount as the entry for the item total, then the item total shall prevail and shall be divided
by the estimated quantity for the item and the price thus obtained shall be the unit price.
Bidder shall exclude the cost of Permit Fees from Bidder’s Base Bid sum; Base Bid sum shall include the cost of
administration and coordination of Governmental Approvals and Utility Fees.
Page 34 of 182
.
.
Item 8 Page 220 of 221
Respectfully submitted:
Signature
Title
Address
Date
License Number Date of Expiration
(SEAL – if Bid is by a corporation)
Attest:
Amount of Certified or Cashier’s Check or Bid Bond $
Name of Bonding Company:
Page 35 of 182
.
.
Item 8 Page 221 of 221
City Council Agenda Report
Meeting Date:April 16, 2024
From:Daniel S. Wall, P.E., Director of Public Works
Department:Public Works
Submitted by:Gerard Garcia, Assistant Engineer
Subject
Notice of Completion for Contract No. 20240122 Gifford Avenue, 48th, 49th, & 50th Street
Improvements
Recommendation
A. Find that the proposed action is categorically exempt from California Environmental Quality
Act (CEQA) review, in accordance with CEQA Guidelines Section 15301, because the project
consists of the maintenance, repair or minor alteration of existing streets and involves negligible
or no expansion of an existing use;
B. Accept the work of Hardy & Harper, Inc. as related to City Contract No. 20240122; and
C. Authorize the Director of Public Works to execute and submit the Notice of Completion for the
project to the Los Angeles County Recorder’s Office.
Background
On January 16, 2024, the City Council awarded City Contract No. 20240122 Gifford Avenue,
48th, 49th, & 50th Street Improvements in the amount of $792,000, including a 10% contingency.
The final construction cost was $755,845.38. This project involved installing thick asphalt
concrete in one lift along Gifford Avenue, 48th, 49th, and 50th Street. In addition, the project
included the construction of ADA ramps, a new curb and gutter, and the construction of tree
wells.
City Contract No. 20240122 was completed and accepted on March 4, 2024, in accordance with
the project specifications and City Staff expectations.
The Notice of Completion was approved as to form by the City Attorney’s office.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Notice of Completion – Contract No. 20240122
.
.
Item 9 Page 1 of 1
RECORDING REQUESTED BY AND WHEN
RECORDED, RETURN TO:
City of Vernon
Attention: City Clerk
4305 Santa Fe Avenue
Vernon, CA 90058
SPACE ABOVE THIS LINE RESERVED FOR RECORDER’S USE
For the benefit of City of Vernon
No fee per Government Code Section 27383 APN: N/A
NOTICE OF COMPLETION
NOTICE IS HEREBY GIVEN THAT, PURSUANT TO CIVIL CODE SECTION 9024:
1. The undersigned is the owner, or corporate officer of the owner, of the interest or estate below in the
property hereinafter described.
2. The full name of the owner is: The City of Vernon.
3. The full address of the owner is: 4305 Santa Fe Avenue, Vernon, CA 90058.
4. The nature of the interest or estate of the owner is: In Fee.
5. A work of improvement on the property hereinafter described was completed and accepted on March 4,
2024. The work done was: Gifford Avenue, 48th,49th, and 50th Street Improvements, Contract No.
20240122.
6. The name of the contractor, if any, for such work of improvement was Hardy & Harper, Inc.
The property on which said work of improvement was completed is in the City of Vernon, County of Los
Angeles, State of California, and is described as follows: Project involved installing thick asphalt concrete in
one lift along Gifford Avenue, 48th, 49th, and 50th Street. In addition, the project included the construction
of ADA ramps, a new curb and gutter, and the construction of tree wells.
Dated: April 16, 2024
I, Daniel Wall, Director of Public Works, verify the foregoing Notice of Completion on behalf of the City of
Vernon; I have read said Notice and know the contents thereof; and I have personal knowledge of the facts
stated herein. I declare under penalty of perjury that the foregoing is true and correct.
_______________________________
Daniel Wall, Director of Public Works
On __________, before me, Yonnie Parker, Deputy City Clerk for the City of Vernon, personally appeared
Daniel Wall, Director of Public Works for the City of Vernon, who proved to me on the basis of satisfactory
evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he
executed the same in his authorized capacity, and that by his signature on the instrument the person, or entity
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document, to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
.
.
Item 9 Page 1 of 2
upon behalf of which he acted, executed the instrument.
WITNESS my hand and official seal.
_________________________________
Yonnie Parker, Deputy City Clerk
.
.
Item 9 Page 2 of 2
City Council Agenda Report
Meeting Date:April 16, 2024
From:Todd Dusenberry, General Manager of Public Utilities
Department:Public Utilities
Submitted by:Adriana Ramos, Administrative Analyst
Subject
Letter Agreement with Southern California Edison Company
Recommendation
A. Find that the proposed action is categorically exempt from California Environmental Quality
Act (CEQA) review, because the work being approved by this Letter Agreement (Phase 1)
consists of engineering and materials procurement that will not result in direct or indirect physical
changes in the environment, and therefore does not constitute a “project” as defined by CEQA
Guidelines Section 15378. Upon completion of Phase 1, a separate Letter Agreement will be
presented to City Council for the construction portion of this project (Phase 2);
B. Approve and authorize the City Administrator to execute a Letter Agreement with Southern
California Edison Company (SCE), in substantially the same form as submitted, for SCE to
perform required engineering and procurement work related to Interconnection Facilities,
Distribution Upgrades, and Network Upgrades, in an amount not-to-exceed $14,024,895; and
C. Authorize a contingency amount of five percent (5%) or $701,245 for unforeseen changes in
fees or other expenses not included in the proposal, and grant authority to the City Administrator
to issue change orders for an amount up to the contingency amount, if necessary.
Background
The City is proposing to provide new electric service to several large commercial projects under
development, which requires that up to 150 megawatts of new electric load be constructed at
different locations in Vernon. The potential new electric loads will demand service from the City’s
66kV sub-transmission system that is interconnected with the Southern California Edison
Company (SCE) Laguna Bell Substation (the Project).
In accordance with the Laguna Bell – Vernon Interconnection Service Agreement (IA), adopted
on September 16, 1997 via Resolution No. 7017, Vernon Public Utilities (VPU) submitted a
request to SCE for Interconnection Service and Transmission Service. Although the service
request was made under the existing IA, SCE concluded that a System Impact Study and a
Facilities Study were required to determine the adequacy of SCE’s electrical system including,
but not limited to, the portion of SCE’s electrical system that is part of the California Independent
System Operator (CAISO) Grid. Accordingly, on September 20, 2022, the City entered into the
Laguna Bell-Vernon Interconnection Service Agreement Combined System Impact and Facilities
Study Agreement with SCE. SCE has completed the study, and the Interconnection Facilities
Study Report (Report) was published on September 7, 2023.The Report detailed the upgrades
that are necessary for the SCE system which will be performed in two phases to accommodate
the new electric load, and will include enhancements to facilities at the Laguna Bell Substation
and two new sub-transmission source lines from SCE’s Laguna Bell Substation to the City
boundaries.
In the interest of working towards the goal of increasing the City’s electric load capacity to feed
potential new development projects, staff recommends that SCE commence work recommended
by the Report. Phase 1 of the Project consists of the engineering and material procurement by
SCE for which the City will pay for specified portions (as described in Exhibit C, Payment, and .
.
Item 10 Page 1 of 2
Financial Security Schedule, of the Letter Agreement). The estimated cost to complete the
necessary work in Phase 1 is $14,024,895, and the City will make eighteen (18) monthly
payments to SCE for Phase 1.
Upon completion of SCE’s engineering and procurement activities, the City will move into Phase
2 of the Project and will be required to enter into a separate Agreement with SCE for the
construction portion of the Project which is expected to be presented to the City Council in March
2025. The cost for the construction in Phase 2 of the Project will be determined based on SCE’s
engineering and design activities of Phase 1. VPU staff has addressed the Project funding for
Phase 1 as part of the Fiscal Year 2024-25 budget process. Pursuant to Vernon Municipal Code
Sections 3.32.110 (A)(2) and 3.32.110 (B)(1), the proposed work is exempt from competitive
bidding and competitive selection, as SCE is the City’s transmission service provider and the
engineering and procurement work related to Interconnection Facilities, Distribution Upgrades,
and Network Upgrades can only be performed by SCE.
The SCE Letter Agreement has been reviewed and approved as to form by the City Attorney’s
Office.
Fiscal Impact
The fiscal impact is not-to-exceed $14,726,140, including the five percent contingency. Sufficient
funds of $2,366,804 are available in Electric Fund, Engineering Department, Capital Outlay
Account No. 055-050-585-660000 for the current fiscal year (FY) and remaining project costs will
be budgeted in FY 2024-25 and FY 2025-26.
Attachments
1. SCE - Letter Agreement
.
.
Item 10 Page 2 of 2
1
Title Page
Southern California Edison Company FERC FPA Electric Tariff
Tariff Title: Wholesale Distribution Access Tariff
Tariff Record Title: Service Agreement No. XXX
LETTER AGREEMENT
BETWEEN
CITY OF VERNON
AND
SOUTHERN CALIFORNIA EDISON COMPANY
PROJECT: DATA CENTERS TWO (SCE EAK048 AND SCE WDT1810EXP)
Contract Effective Date: xx/xx/xx Tariff Record Proposed Effective Date: xx/xx/xx
905.xxx.x Version Number: 0.0.0
EAK048 AND WDT1810EXP Option Code: A
.
.
Item 10 Page 1 of 29
2
LETTER AGREEMENT
April 8, 2024
Carlos R. Fandino
City Administrator
City of Vernon
Vernon Public Utilities
4305 Santa Fe Avenue Vernon, CA 90058
Re: Letter Agreement for the Data Centers Two Project EAK048 and WDT1810EXP
Mr. Fandino:
City of Vernon (“Interconnection Customer”) is proposing to construct and operate the Data
Centers Two Project (“Project”), consisting of a 150 MW load project sited at three different
locations within the City of Vernon service area. Each of the three new sites will have a 50 MW
load, totaling 150 MW.
On May 12, 2022, Interconnection Customer submitted a load Interconnection Request to
Southern California Edison Company (“SCE”), requesting to interconnect the Project at SCE’s
existing Laguna Bell 66 kV Substation. Interconnection Customer’s load Interconnection
Request was received by SCE on May 12, 2022. It describes the projected amount of load
growth, the general location of the load, and the estimated in-service date for each load (“Data
Centers Two Project Load Request”). Based on the Data Centers Two Project Load Request,
SCE performed a Method of Service Study and provided Interconnection Customer with a
Method of Service Study Subtransmission Assessment dated March 6, 2023, which describes the
impacts to SCE’s electrical system from the Interconnection Customer’s Data Centers Two
Project Load Request (“Method of Service Study Report”). As a result of the findings identified
in the Method of Service Study Report, SCE performed an Interconnection Facilities Study and
provided Interconnection Customer with a report dated September 7, 2023, which estimates the
scope, cost and installation schedule of the required mitigations needed to accommodate the load
requirements of the Project (“Interconnection Facilities Study Report”). The Method of Service
Study Report and the Interconnection Facilities Study Report were provided to Interconnection
Customer on September 7, 2023.
All capitalized terms used herein which are, not otherwise defined, shall have the meaning
ascribed to that term in Section 2 of, or Attachment I to the SCE Wholesale Distribution Access
Tariff (“WDAT”)(“GIP”) 1. Interconnection Customer and SCE are sometimes referred to
herein individually as “Party” and collectively as “Parties.”
1 While the instant Agreement uses certain capitalized terms defined in the Generator Interconnection Procedures
(“GIP”) Attachment to SCE’s WDAT, both Parties understand that the Project is a load interconnection project, not
a generation interconnection project. .
.
Item 10 Page 2 of 29
3
In the interest of working towards the achievement of Interconnection Customer’s expected
operating date for the Project, as set forth in Exhibit D (Milestones), Interconnection Customer
desires for SCE to commence certain engineering and design work prior to executing an
Interconnection Facilities Agreement (“IFA”). Accordingly, the purpose of this letter agreement
(“Agreement”) sets forth the terms and conditions of an interim arrangement pursuant to which
SCE will perform, and Interconnection Customer will pay for, certain Work, as described herein:
1. Work. SCE will perform the Work, as described in Exhibit A, upon payment by
Interconnection Customer of amounts described in Section 2 and according to the terms
provided herein. SCE shall perform the Work only after receipt of the payments and
Financial Security set forth in Exhibit C, as may be modified by Section 2.2 and any
applicable Milestones set forth in Exhibit D. The Interconnection Customer acknowledges
and understands that upon completion of the Work described in Exhibit A, additional
Network Upgrades, Interconnection Facilities and/or Distribution Upgrades may be
necessary to enable operation of the Project, and such will be included in the IFA
contemplated by the Parties.
2. Payments and Financial Security
2.1. Payments/Financial Security. In order for SCE to perform its obligations under
the terms and conditions of this Agreement, Interconnection Customer shall
provide to SCE the payments and Financial Security, in such estimated amounts
as set forth in Exhibits B and C (as may be modified as described in Section 2.2)
and in such form and on such dates as set forth in Exhibit C. SCE will provide
Interconnection Customer an invoice of such payment obligations, which must be
paid by the payment dates set forth in Exhibit C.
.
.
Item 10 Page 3 of 29
4
2.2. Additional Amounts. SCE shall notify Interconnection Customer in writing
within a reasonable time if SCE learns that charges and expenses are likely to
exceed the estimated amounts specified in Exhibit B, warranting adjustments to
amounts in Exhibit C. In the event of such notification, SCE shall specify the
payment and corresponding Financial Security increase(s) and Interconnection
Customer shall pay such additional amounts within thirty (30) Calendar Days of
receipt of an invoice for such additional amounts. The Parties will agree to amend
the Agreement in order to reflect and collect the additional amounts required,
subject to FERC’s approval, as applicable, before an invoice for the additional
amounts is issued to the Interconnection Customer.
2.3. Failure to Pay; Insolvency. Subject to Section 3.2, in the event that
Interconnection Customer fails to provide payment for amounts incurred or
irrevocably committed to be incurred, or fails to provide Financial Security,
pursuant to this Agreement, SCE may (a) immediately stop Work; (b) draw on the
Interconnection Financial Security for any amounts due to SCE during the term of
this Agreement, and/or (c) terminate this Agreement by written notice of
cancellation effective upon FERC approval. In the event that Interconnection
Customer (i) is dissolved; (ii) becomes insolvent; (iii) becomes the subject of a
petition in bankruptcy, either voluntary or involuntary, or in any other proceeding
under federal bankruptcy laws; (iv) makes an assignment for the benefit of
creditors, excluding any assignment for financing purposes; (v) is named in a suit
for the appointment of a receiver, SCE may, in addition to (a) through (c) above,
.
.
Item 10 Page 4 of 29
5
draw on the Tax Security (as defined in the IFA) for any tax liability imposed on
SCE during the term of this Agreement.
3. Dispute. Disputes arising out of or in connection with this Agreement shall be resolved
as follows:
3.1. Submission. In the event either Party has a dispute, or asserts a claim, that arises
out of or in connection with this Agreement or its performance, such Party (the
“disputing Party”) shall provide the other Party with written notice of the dispute
or claim (“Notice of Dispute”). Such dispute or claim shall be referred to a
designated senior representative of each Party for resolution on an informal basis
as promptly as practicable after receipt of the Notice of Dispute by the other
Party. In the event the designated representatives are unable to resolve the claim
or dispute through unassisted or assisted negotiations within thirty (30) Calendar
Days of the other Party’s receipt of the Notice of Dispute, such claim or dispute
may, upon mutual agreement of the Parties, be submitted to arbitration and
resolved in accordance with the arbitration procedures set forth below. In the
event the Parties do not agree to submit such claim or dispute to arbitration, each
Party may exercise whatever rights and remedies it may have in equity or at law
consistent with the terms of this Agreement.
3.2. Payment Dispute. In the event of a billing dispute between SCE and the
Interconnection Customer, SCE shall continue to perform the Work under this
Agreement as long as the Interconnection Customer: (i) continues to make all
payments not in dispute; and (ii) pays to SCE or into an independent escrow
account the portion of the invoice in dispute, pending resolution of such dispute. .
.
Item 10 Page 5 of 29
6
If the Interconnection Customer fails to meet these two requirements for
continuation of service, then SCE may invoke remedies in Section 2.3. Within
thirty (30) Calendar Days after the resolution of the dispute, the Party that owes
money to the other Party shall pay the amount due with interest calculated in
accordance with the methodology set forth in FERC's Regulations at 18 C.F.R. §
35.19a(a)(2)(iii).
3.3. External Arbitration Procedures. Any arbitration initiated under this
Agreement shall be conducted before a single neutral arbitrator appointed by the
Parties. If the Parties fail to agree upon a single arbitrator within ten (10)
Calendar Days of the submission of the dispute to arbitration, each Party shall
choose one arbitrator who shall sit on a three-member arbitration panel. The two
arbitrators so chosen shall within twenty (20) Calendar Days select a third
arbitrator to chair the arbitration panel. In either case, the arbitrators shall be
knowledgeable in electric utility matters, including electric transmission and bulk
power issues, and shall not have any current or past substantial business or
financial relationships with any party to the arbitration (except prior arbitration).
The arbitrator(s) shall provide each of the Parties an opportunity to be heard and,
except as otherwise provided herein, shall conduct the arbitration in accordance
with the Commercial Arbitration Rules of the American Arbitration Association
(“Arbitration Rules”) and any applicable FERC regulations; provided, however,
in the event of a conflict between the Arbitration Rules and the terms of Section 3,
the terms of this Section 3 shall prevail.
.
.
Item 10 Page 6 of 29
7
3.4. Arbitration Decisions. Unless otherwise agreed by the Parties, the arbitrator(s)
shall render a decision within ninety (90) Calendar Days of appointment and shall
notify the Parties in writing of such decision and the reasons therefor. The
arbitrator(s) shall be authorized only to interpret and apply the provisions of this
Agreement and shall have no power to modify or change any provision of this
Agreement in any manner. The decision of the arbitrator(s) shall be final and
binding upon the Parties, and judgment on the award may be entered in any court
having jurisdiction. The decision of the arbitrator(s) may be appealed solely on
the grounds that the conduct of the arbitrator(s), or the decision itself, violated the
standards set forth in the Federal Arbitration Act or the Administrative Dispute
Resolution Act. The final decision of the arbitrator must also be filed with FERC
if it affects jurisdictional rates, terms and conditions of service, or Interconnection
Facilities.
3.5. Costs. Each Party shall be responsible for its own costs incurred during the
arbitration process and for the following costs, if applicable: (1) the cost of the
arbitrator chosen by the Party to sit on the three-member arbitration panel and one
half of the cost of the third arbitrator chosen; or (2) one half the cost of the single
arbitrator jointly chosen by the Parties.
4. Milestone Schedule. The milestone schedule is attached as Exhibit D. SCE shall use
commercially reasonable efforts to complete the Work in accordance with this schedule;
however, SCE does not warrant the Work will be completed in time to meet such deadlines,
and Interconnection Customer understands and acknowledges that such deadlines are only
.
.
Item 10 Page 7 of 29
8
estimates and that the due dates in Exhibit D are dependent on Interconnection Customer
coordinating with SCE to complete the milestones as specified in a timely manner. SCE shall
not be liable for any cost or damage incurred by Interconnection Customer as a result of or
due to any delay in the completion of the Work pursuant to the milestone schedule.
5. Termination.
5.1. Except for terms that survive termination, this Agreement shall terminate upon the
earliest of the following to occur: (i) notice that this Agreement is not accepted for
filing by FERC, if applicable; (ii) the effective date of the IFA, which the Parties
intend to supersede this Agreement; (iii) the Interconnection Customer’s receipt
of SCE’s notice of cancellation pursuant to Section 2.3, which is subject to
acceptance by FERC; (iv) two (2) Business Days after receipt by SCE of a
termination notice from Interconnection Customer to SCE at any time and for any
reason; or (v) withdrawal of the Interconnection Customer’s Interconnection
Request for the Project.
5.2. In the event that either Party terminates this Agreement for reasons other than the
execution of the IFA, SCE shall use commercially reasonable efforts to mitigate
the costs, damages, and charges arising as a consequence of such termination. To
that end, SCE shall cancel, to the extent possible, any pending orders of, or return,
any materials, or equipment procured pursuant to this Agreement. To the extent
that Interconnection Customer has already paid SCE for any or all costs of such
materials, equipment or contracts cancelled or returned, SCE shall refund such
amounts to Interconnection Customer, less any costs or penalties incurred by SCE
to cancel pending orders, or return, of such materials and equipment. .
.
Item 10 Page 8 of 29
9
5.3. In the event that this Agreement is terminated or if the Work is completed before
the effective date of the IFA and a payment shortfall exists pursuant to Section
5.3.2 of this Agreement, SCE shall make reasonable efforts to submit a final
invoice to Interconnection Customer of all charges and expenses within twelve
(12) months from the date of termination of or completion of the Work performed
under this Agreement. In such event, the following true-up process will be used:
5.3.1. Payment Excess. In the event that Interconnection Customer’s
payment(s) paid in accordance with this Agreement exceeds the amount of
SCE’s charges and expenses incurred or irrevocably committed to be incurred
pursuant to this Agreement, SCE shall return the excess amount without
interest to Interconnection Customer within thirty (30) Calendar Days after the
date of a final invoice without offset for any amount that may be in dispute.
5.3.2. Payment Shortfall. In the event that Interconnection Customer’s
payment(s) paid in accordance with this Agreement is less than the amount of
SCE’s charges and expenses incurred or irrevocably committed to be incurred
pursuant to this Agreement, then Interconnection Customer shall pay the
difference, without interest, within thirty (30) Calendar Days of the date of
receipt of a final invoice, without offset for any amount which may be in
dispute. If Interconnection Customer fails to pay the final invoice, SCE shall
also have the right to draw on the Interconnection Financial Security for any
payment shortfall.
5.4. In the event that Interconnection Customer elects to terminate this Agreement but
still take delivery of materials or equipment procured pursuant to this Agreement, .
.
Item 10 Page 9 of 29
10
Interconnection Customer shall assume all payment obligations with respect to
delivery of such materials, equipment, and contracts, and SCE shall transfer such
materials and equipment, and, if necessary, assign such contracts, to
Interconnection Customer as soon as reasonably practicable, at Interconnection
Customer’s expense.
5.5. In the event that Interconnection Customer and SCE enter into a IFA concurrently
with the termination of this Agreement, then any applicable work product
generated by SCE and any associated payments made by Interconnection
Customer pursuant to this Agreement not already credited shall be reflected in the
scope of, and the amount due under, such IFA.
6. Taxes
6.1. ITCC: The Income Tax Component of Contribution specified in the Preliminary
Statement, Part M of SCE’s tariff on file with the CPUC, applicable to the
Interconnection Facilities Cost, and the Capital Additions Cost. The ITCC
applicable to the Interconnection Facilities Cost is provided in Exhibit B.
6.2. If SCE or the IRS makes a determination that the payment(s) made pursuant to
this Agreement are taxable as contributions in aid of construction, either: (i) SCE
may draw on the financial security provided by the Interconnection Customer for
the estimated tax liability held on behalf of the Project to pay the tax liability
imposed on SCE; or (ii) Interconnection Customer may elect to make a
nonrefundable cash payment to SCE within thirty (30) Calendar Days of receipt
of the invoice in the actual amount of the resultant tax liability. The tax liability
will be calculated in accordance with IRS Notice 2016-36.
.
.
Item 10 Page 10 of 29
11
7. Uncontrollable Force. No Party shall be considered to be in default with respect to any
obligation hereunder, other than the obligation to pay money when due, if prevented from
fulfilling such obligation by Uncontrollable Force, which for purposes of clarity shall include
pandemic. A Party unable to fulfill any obligation hereunder (other than an obligation to pay
money when due) by reason of Uncontrollable Force shall give notice and the full particulars
of such Uncontrollable Force to the other Party in writing or by telephone as soon as
reasonably possible after the occurrence of the cause relied upon. Telephone notices given
pursuant to this Section 7 shall be confirmed in writing as soon as reasonably possible and
shall specifically state the full particulars of the Uncontrollable Force, the time and date
when the Uncontrollable Force occurred, and when the Uncontrollable Force is reasonably
expected to cease. The Party affected shall exercise due diligence to remove such disability
with reasonable dispatch, but shall not be required to accede or agree to any provision not
satisfactory to it in order to settle and terminate a strike or other labor disturbance.
8. Indemnity. Each Party shall at all times indemnify, defend, and hold the other Party
harmless from, any and all Losses arising out of or resulting from the other Party’s action or
inactions with respect to its obligations under this Agreement on behalf of the indemnifying
Party, except in cases of gross negligence or intentional wrongdoing by the indemnified
Party.
9. Consequential Damages. In no event shall any Party be liable under any provision of this
Agreement for any losses, damages, costs or expenses for any special, indirect, incidental,
consequential, or punitive damages, including but not limited to loss of profit or revenue, loss
of the use of equipment, cost of capital, or cost of temporary equipment or services, whether
based in whole or in part in contract or in tort, including negligence, strict liability, or any
.
.
Item 10 Page 11 of 29
12
other theory of liability; provided, however, that damages for which a Party may be liable to
another Party under another agreement will not be considered to be special, indirect,
incidental, or consequential damages hereunder.
10. Entire Agreement. This Agreement, including all Exhibits attached hereto, constitutes the
complete and final expression of the agreement between the Parties and is intended as a
complete and exclusive statement of the terms of their agreement. This Agreement
supersedes all prior and contemporaneous offers, promises, representations, negotiations,
discussions, communications, and other agreements, which may have been made in
connection with the subject matter of this Agreement. Nothing in this Agreement is intended
or shall be deemed to require SCE or Interconnection Customer to enter into any other
agreement, including without limitation any agreement to interconnect the Project. Should
the Parties enter into an IFA, such IFA will supersede this Agreement.
11. Insurance. Each Party shall maintain insurance coverage consistent with the requirements as
set forth in the IFA.
12. Access Rights. Each Party shall provide access rights consistent with the requirements as set
forth in the IFA.
13. Waiver. Any waiver at any time by either Party of its rights with respect to this Agreement,
shall not be deemed a waiver with respect to any other failure to comply with any obligation,
right or duty of this Agreement. Any delay, with the exception of the statutory period of
limitation in assessing or enforcing any right, shall not be deemed a waiver of such right.
14. No Joint Liability. The covenants, obligations, and liabilities of the Parties are intended to
be several and not joint or collective, and nothing contained in this Agreement shall ever be
.
.
Item 10 Page 12 of 29
13
construed to create an association, joint venture, trust, or partnership, or to impose a trust or
partnership covenant, obligation, or liability on or with regard to either Party. Each Party
shall be individually responsible for its own covenants, obligations, and liabilities as
provided in this Agreement. Neither Party shall be under the control of the other Party.
Neither Party shall be the agent of or have a right or power to bind the other Party without
such other Party’s express written consent.
15. No Third Party Beneficiaries. The Parties do not intend to create rights in, or to grant
remedies to, any third party as a beneficiary either of this Agreement or of any duty,
covenant, obligation, or undertaking established herein.
16. Governing Law. This Agreement shall be interpreted by and in accordance with the laws of
the State of California, without regard to the principles of conflict of laws therefor, or the
laws of the United States, as applicable, as if executed and to be performed wholly within the
United States.
17. Successors and Assigns. This Agreement shall be binding upon the Parties and their
successors and assigns. This Agreement may be assigned by a Party only with the written
consent of the other Party; provided that a Party may assign this Agreement without the
consent of the other Party to any Affiliate of the assigning Party with an equal or greater
credit rating and with the legal authority and operational ability to satisfy the obligations of
the assigning Party under this Agreement; and provided further that the Interconnection
Customer shall have the right to assign this Agreement, without the consent of the other
Party, for collateral security purposes to aid in providing financing for the Generating
Facility, provided that the Interconnection Customer will require any secured party, trustee or
mortgagee to notify the other Party of any such assignment. Any financing arrangement .
.
Item 10 Page 13 of 29
14
entered into by the Interconnection Customer pursuant to this Section will provide that prior
to or upon the exercise of the secured party’s, trustee’s or mortgagee’s assignment rights
pursuant to said arrangement, the secured creditor, the trustee or mortgagee will notify the
other Party of the date and particulars of any such exercise of assignment right(s). Any
attempted assignment that violates this Section is void and ineffective. Any assignment
under this Agreement shall not relieve a Party of its obligations, nor shall a Party’s
obligations be enlarged, in whole or in part, by reason thereof. Where required, consent to
assignment will not be unreasonably withheld, conditioned or delayed.
18. Survival. Indemnity obligations and obligations to pay charges and expenses incurred or
irrevocably committed to be incurred pursuant to this Agreement will survive termination of
this Agreement.
19. FERC Filing. SCE will report this Agreement and amendments thereto in its Electronic
Quarterly Report (“EQR”) in lieu of filing it at FERC, pursuant to Applicable Laws and
Regulations.
20. Reservation of Rights. SCE shall have the right to make a unilateral filing with FERC to
modify this Agreement with respect to any rates, terms and conditions, charges,
classifications of service, rule or regulation under section 205 or any other applicable
provision of the Federal Power Act and FERC’s rules and regulations thereunder, and
Interconnection Customer shall have the right to make a unilateral filing with FERC to
modify this Agreement pursuant to section 206 or any other applicable provision of the
Federal Power Act and FERC’s rules and regulations thereunder; provided that each Party
shall have the right to protest any such filing by another Party and to participate fully in any
proceeding before FERC in which such modifications may be considered. Nothing in this .
.
Item 10 Page 14 of 29
15
Agreement shall limit the rights of the Parties or of FERC under sections 205 or 206 of the
Federal Power Act and FERC’s rules and regulations thereunder, except to the extent that the
Parties otherwise mutually agree as provided herein.
21. Construction. Ambiguities or uncertainties in the wording of this Agreement shall not be
construed for or against any Party, but shall be construed in the manner that most accurately
reflects the Parties’ intent as of the date they executed this Agreement.
22. Amendment. The Parties may by mutual agreement amend this Agreement by a written
instrument duly executed by all of the Parties. Such amendment shall become effective and a
part of this Agreement upon satisfaction of all Applicable Laws and Regulations.
23. Confidentiality. The provisions governing confidentiality in the IFA are hereby incorporated
herein, in their entirety.
24. Authority. Each Party hereby represents that it has the right, power, and authority to enter
into this Agreement, to become a Party hereto and to perform its obligations hereunder. This
Agreement is a legal, valid and binding obligation of such Party, enforceable against such
Party in accordance with its terms, except as the enforceability thereof may be limited by
applicable bankruptcy, insolvency, reorganization or other similar laws affecting creditors’
rights generally and by general equitable principles (regardless of whether enforceability is
sought in a proceeding in equity or at law).
25. Warranties. Interconnection Customer warrants that it is duly organized, validly existing
and in good standing under the laws of the state in which it is organized, formed, or
incorporated, as applicable; and that it is qualified to do business in the state or states in
which the Interconnection Facilities will be located; and that it has the corporate power and
.
.
Item 10 Page 15 of 29
16
authority to own its properties, to carry on its business as now being conducted and to enter
into this Agreement and carry out the transactions contemplated hereby and perform and
carry out all covenants and obligations on its part to be performed under and pursuant to this
Agreement.
26. Headings. The descriptive headings of the various Sections of this Agreement have been
inserted for convenience of reference only and are of no significance in the interpretation or
construction of this Agreement.
27. Execution. This Agreement may be executed in two or more counterparts, each of which is
deemed an original, but all constitute one and the same instrument.
.
.
Item 10 Page 16 of 29
17
28. Effective Date. This Agreement shall become effective upon execution by all Parties subject
to acceptance by FERC (if applicable), or if filed unexecuted, upon the date specified by
FERC.
SOUTHERN CALIFORNIA EDISON COMPANY
By _________________________
Name: Jim Buerkle
Title: Managing Director of Major Projects, Design
Engineering, and Grid Contracts
ACCEPTED AND AGREED to this day of __________________
CITY OF VERNON
By: _____________________________
Name: _ Carlos R. Fandino_____________
Title: __City Administrator____________
ATTEST:
____________________________________
Yonnie Parker, Deputy City Clerk
APPROVED AS TO FORM:
_____________________________________
Zaynah N. Moussa, City Attorney
ACCEPTED AND AGREED to this day of __________________
.
.
Item 10 Page 17 of 29
18
EXHIBIT A
SCOPE OF WORK
A description of the Work to be performed by SCE. A one-line diagram of the interconnection is
included.
SCE’s Interconnection Facilities described in this Exhibit A to the Agreement are based on
SCE’s preliminary engineering and design and were derived from SCE’s Interconnection
Facilities Study Report.
The Work to be performed under this Agreement is solely the detailed design, engineering, and
procurement for the Interconnection Facilities described below, in order to advance the Project
towards its in-service date using reasonable efforts prior to the execution of an IFA. SCE will not
perform any construction for the Interconnection Facilities under this Agreement; such
construction activities will be performed pursuant to a subsequent IFA.
SCE will commence detailed design, engineering, and procurement for the Interconnection
Facilities described below.
1. Interconnection Facilities:
(i) Laguna Bell Substation (DE Section for 50 MW of the 150 MW)
Perform relay coordination study
(ii) Laguna Bell Substation (AB Section for 100 MW of the 150 MW)
1. Install facilities for two (2) new 66 kV switchrack positions. This work includes the
following for each of the new positions:
a. One (1) 66 kV dead-end switchyard structure.
b. Two (2) 66 kV voltage transformers with steel pedestal support structures.
c. Three (3) 66 kV line drops.
d. Two (2) 66 kV circuit breakers.
e. Four (4) 66 kV group operated disconnect switches, one with grounding
attachment.
2. Install the following relays to protect the new line position:
Two (2) line current differential relays. The make and type of current differential
relays will be specified by SCE during final engineering of SCE Interconnection
Facilities.
(iii) Laguna Bell-P.S.33 66 kV line (AB Section for 100 MW of the 150 MW).
1. Utilize approximately 3.75 miles of existing idle line. Use of this existing idle line
will require pole replacements, pole head frames, and insulator replacements which
will be determined during execution of the project.
2. Install new overhead and underground facilities to complete the line into Laguna Bell
Substation (AB section). The actual scope will be determined during execution of the
project. This study assumed the following:
a. Installation of three (3) tubular steel riser poles
.
.
Item 10 Page 18 of 29
19
b. Installation of three (3) underground vaults
c. Installation of approximately 1,500’ of duct bank
d. Installation of approximately 5,700’ of underground cable
e. Installation of ten (10) wood poles
f. Thirty-three (33) pole head reframes
g. Thirteen (13) pole head insulator replacements
h. Approximately 2,500’ of overhead conductor
(iv) Laguna Bell-P.S.20-P.S.38 66 kV line. (AB Section for 100 MW of the 150 MW)
1. Utilize approximately 3.25 miles of existing idle line. Use of this existing idle line will
require pothead replacements, pole head frames, and insulator replacements which will
be determined during execution of the project.
2. Install new overhead and underground facilities to complete the line into Laguna Bell
Substation (AB section). The actual scope will be determined during execution of the
project. The Interconnection Facilities Study Report assumed the following:
a. Installation of two (2) tubular steel riser poles
b. Installation of six (6) underground vaults
c. Installation of approximately 5,700’ of duct bank
d. Installation of approximately 19,000’ of underground cable
e. Installation of one (1) pole switch
f. Forty-one (41) pole head reframes
g. Sixteen (16) pole head insulator replacements
h. Two (2) tubular steel pole pothead replacements
i. One (1) tubular steel pole replacement
(v) Telecommunications. (AB Section for 100 MW of the 150 MW)
1. Install all required lightwave, channel banks, and associated equipment (including
terminal equipment), supporting line protection and the RTU requirements at the
Laguna Bell Substation.
2. Install fiber optic cable from Laguna Bell Substation to the City of Vernon boundary
along the existing Laguna Bell-P.S.33 66 kV line. The Study assumed the installation
of approximately 300’ of underground fiber optic cable from Laguna Bell Substation to
outside the fence line and rise up with approximately 3.75 miles of overhead fiber optic
cable to the City of Vernon boundary.
3. Install fiber optic cable from Laguna Bell Substation to the City of Vernon boundary
along the existing Laguna Bell-P.S.20-P.S.38 66 kV line. The Study assumed the
installation of approximately 300’ of underground fiber optic cable from Laguna Bell
Substation to outside the fenceline and rise up with approximately 3.25 miles of
overhead fiber optic cable to the City of Vernon boundary.
(vi) Metering. (AB Section for 100 MW of the 150 MW).
Install meters required to meter the retail load at the City of Vernon. Notwithstanding
that the meters will be located on the Interconnection Customer’s side of the Point of
Change of Ownership, SCE shall own, operate and maintain such facilities as part of the
SCE’s Interconnection Facilities.
(vii) Power System Controls. (AB Section for 100 MW of the 150 MW).
Add points to existing RTU at Laguna Bell Substation to include points for new protection
.
.
Item 10 Page 19 of 29
20
relay/status/alarm/control.
(viii) Real Properties. (AB Section for 100 MW of the 150 MW).
Obtain easements and/or acquire land for the installation of SCE’s Interconnection
Facilities.
(ix) Environmental Activities, Permits, and Licensing. (AB Section for 100 MW of the 150
MW)
Perform and/or coordinate the required environmental activities and obtain required
licensing and permits for the installation of SCE’s Interconnection Facilities, including any
associated telecommunication equipment, if applicable.
1. SCE Scope of Work
i. SCE will act as the lead for regulatory agency communication for permits
issued to SCE covering such SCE facilities.
ii. SCE environmental activities may include, but are not limited to, the following:
a. Perform all environmental studies and construction monitoring of SCE
internal substation construction activities and provide study results to
the City of Vernon for inclusion in its environmental documents, if
applicable.
b. Collaborate with the City of Vernon during the environmental study
phase on the City of Vernon’s proposed study methodologies and
findings, as studies are being planned and performed for SCE’s scope of
work.
c. Review City of Vernon’s CEQA and/or National Environmental Policy
Act (“NEPA”) documents, technical studies, surveys, and other
environmental documentation to ensure SCE’s scope of work is
adequately described in such documents (City of Vernon will include
SCE’s scope of work in its environmental documents. If the City of
Vernon’s CEQA and/or NEPA documents do not sufficiently incorporate
SCE’s scope of work, SCE’s assumed environmental work and permitting
level of effort may increase, resulting in the need to update cost and
duration estimates, and potentially amend the Interconnection
Agreement).
d. Review SCE’s internal existing technical reports/documents when
available.
e. Prepare SCE’s project description, including scope changes during
permitting/preconstruction or construction.
f. Communicate scope changes to the City of Vernon’s environmental
team and discuss/approve subsequent actions including new surveys as
necessary.
g. Complete General Order 131-D Consistency Determination and
Environmental Evaluation.
h. Regulatory agency communication, consultation, reporting, and
acquisition of SCE permits addressing SCE's facilities and scope of work.
i. Prepare environmental requirements for construction clearance.
j. Develop communication plan.
.
.
Item 10 Page 20 of 29
21
k. Perform pre-construction coordination field visit.
l. Provide Environmental Awareness/Worker Environmental Awareness
Program (“WEAP”) training.
m. Perform construction monitoring oversight.
n. Complete construction and post-construction site assessments.
2. City of Vernon Scope of Work
i. City of Vernon will perform all environmental studies and prepare draft
environmental permit applications related to the installation of such SCE
facilities, except for the SCE internal substation activities as described above. The
City of Vernon’s responsibilities include as applicable, but are not limited to:
notifications to the Native American Heritage Commission (“NAHC”) and follow
up notifications to the tribes and individuals in the NAHC contact list; performing
cultural and paleontological resources records searches, cultural resources
inventories (survey and recording), testing and evaluation and/or data recovery of
archaeological sites, and appropriate documents in the form of inventory reports,
research design, and/or data recovery reports; cultural and
paleontological monitoring when/if required, and arranging curation agreements
for artifacts and fossil specimens collected; performing a California Natural
Diversity Database search, habitat assessment, and protocol or focused surveys
for species with the potential of occurring in identified suitable habitat;
conducting jurisdictional delineations for wetlands and other regulated waters;
preparing draft environmental permit applications, pre-construction biological
resource surveys for such SCE facilities, biological resource monitoring during
construction of such SCE facilities; mitigation costs including, but not limited to,
offsite/compensatory mitigation and onsite restoration, and developing
mitigation plans or other environmental reports or submittals to support
installation of such SCE facilities.
ii. Prior to commencing work and during execution of work, the City of Vernon
should collaborate and obtain SCE concurrence on all work outlined above.
Should the City of Vernon-performed environmental studies, surveys, or
construction monitoring not meet the Federal or State industry standards in
accordance with Applicable Laws and Regulations, and as determined by SCE,
the City of Vernon shall be obligated to remedy deficiencies under SCE’s
direction.
In the event the assumptions presume that the Interconnection Customer performs
part of the environmental activities on SCE’s behalf, the Interconnection
Customer will be required to:
1. Provide SCE the Environmental Services Costs Declaration of the actual
costs incurred for work performed.
2. Remedy any and all deficiencies under SCE’s direction, should the
environmental studies and resulting reports not comply with industry
standards established by State of California and/or Applicable Laws and
Regulations, as determined by SCE.
.
.
Item 10 Page 21 of 29
22
2. Point of Change of Ownership, Point of Interconnection and One-Line Diagram of
Interconnection:
For purposes of the Work to be performed under this Agreement, the following assumptions
shall apply with respect to the Point of Change of Ownership and Point of Interconnection:
i. Point of Change of Ownership.
(i) Laguna Bell-P.S.33 66 kV Line: The Point of Change of Ownership shall be the
point where the conductors of the Laguna Bell-P.S.33 66 kV Line are attached to
the Last Structure at the City of Vernon boundary. The City of Vernon shall own
and maintain the Last Structure, the conductors, insulators, and jumper loops from
such Last Structure to the City of Vernon facilities. SCE will own the insulators that
are used to attach the SCE owned conductors to the Last Structure.
(ii) Laguna Bell-P.S.33 66 kV Line telecommunication fiber optic cable: The Point of
Change of Ownership shall be the point designated by SCE where the
Interconnection Customer’s fiber optic cable is attached to the SCE owned fiber
optic cable at the City of Vernon boundary.
(iii) Laguna Bell-P.S.20-P.S.38 66 kV Line: The Point of Change of Ownership shall be
the point where the conductors of the Laguna Bell-P.S.33 66 kV Line are attached
to the Last Structure at the City of Vernon boundary. The City of Vernon shall own
and maintain the Last Structure, the conductors, insulators, and jumper loops from
such Last Structure to the City of Vernon facilities. SCE will own the insulators that
are used to attach the SCE owned conductors to the Last Structure.
(iv) Laguna Bell-P.S.20-P.S.38 66 kV Line telecommunication fiber optic cable: The
Point of Change of Ownership shall be the point designated by SCE where the
Interconnection Customer’s fiber optic cable is attached to the SCE owned fiber
optic cable at the City of Vernon boundary.
ii. Point of Interconnection. SCE’s Laguna Bell 66 kV Substation.
.
.
Item 10 Page 22 of 29
23
iii. One-Line Diagram of Interconnection.
.
.
Item 10 Page 23 of 29
24
EXHIBIT B
ESTIMATED COST OF THE WORK AND FINANCIAL SECURITY
SCE will provide an estimated cost of the Work identified in Exhibit A and any associated
financial security, including Interconnection Financial Security and ITCC.
a. Estimated Cost
Element- Interconnection
Facilities Cost
One-Time Cost
ITCC Total
Distribution Provider’s Interconnection
Facilities
Laguna Bell-P.S.33 66kV Line $2,513,331 $603,199 $3,116,530
Laguna Bell-P.S. 20-P.S.38 66 kV Line $4,108,342 $986,002 $5,094,343
Laguna Bell Substation Switchrack $3,324,745 $797,939 $4,122,683
Power System Controls $15,904 $0.00 $15,904
Metering Services $62,044 $14,890 $76,934
IT Telecommunications $199,478 $47,875 $247,352
Laguna Bell-P.S.33 66kV Line
Transmission Telecommunication $395,926 $95,022 $490,948
Laguna Bell-P.S. 20-P.S.38 66 kV Line
Transmission Telecommunication $409,232 $98,216 $507,448
Environmental and Licensing $117,513 $28,203 $145,716
Real Properties $115,006 $27,601 142,607
Laguna Bell Relay Coordination $64,430 $0.00 $64,430
Total $11,245,614 $80,334 $2,698,947 $14,024,895
Note 1: All amounts shown above are in nominal dollars.
Note 2: The estimated costs provided in the table above are based on the Interconnection Facilities Study
Report and have been adjusted to reflect solely the Work SCE will perform for the Facilities as provided in
Exhibit A of this Agreement.
b. Financial Security
i. Interconnection Financial Security.
1. The Distribution Provider’s Interconnection Facilities: Pursuant to Section 2 of this
Agreement, the Interconnection Customer shall provide Interconnection Financial
Security in the total amount of $2,000,000 to cover the costs for the Work identified
in Section a.i of Exhibit A. The Interconnection Customer can reduce the
Inteconnection Financial Security amount on a dollar for dollar basis once the total
Project Payment amount outstanding becomes less than the Interconnection Financial
Security amount posted.
ii. Estimated Tax Liability.
Pursuant to Section 6 of this Agreement, the Interconnection Customer’s estimated tax
liability is as follows:
Estimated tax liability for Distribution Provider’s Interconnection Facilities = The sum of
the product of (i) the applicable ITCC rate for the year payments are to be received, and
.
.
Item 10 Page 24 of 29
25
(ii) the total of the payments to be received for the Interconnection Facilities Cost for that
year.
Year(s) payments
to be received
Applicable ITCC
rate
Total payments to be
received for
Interconnection
Facilities Cost
ITCC for Distribution
Provider’s
Interconnection
Facilities
2023 & beyond See Section 4.4 of
Attachment J to
the Tariff
$11,245,614 Applicable ITCC rate x
Total payments to be
received for
Interconnection
Facilities Cost
*The rate(s) applicable to the Tax Security is in accordance with Attachment J to the WDAT.
.
.
Item 10 Page 25 of 29
26
EXHIBIT C
PAYMENT AND FINANCIAL SECURITY SCHEDULE
SCE will include a schedule(s) of the amount, and due date, for the payments and financial
security, as applicable, reflected in Exhibit B.
a. Payment Schedule
The payment amounts shown below are based on an estimate of the monthly incurred costs
for the scope of Work identified in Exhibit A.
Payment
No.
Payment
Due Date
Interconnection
Facilities Cost
One-
Time
Cost
ITCC Project
Payment
1 5/1/2024 $132,670 $948 $31,841 $165,459
2 6/1/2024 $161,445 $1,153 $38,747 $201,345
3 7/1/2024 $195,893 $1,399 $47,014 $244,306
4 8/1/2024 $236,857 $1,692 $56,846 $295,395
5 9/1/2024 $285,176 $2,037 $68,442 $355,655
6 10/1/2024 $341,605 $2,440 $81,985 $426,030
7 11/1/2024 $406,703 $2,905 $97,609 $507,217
8 12/1/2024 $480,697 $3,434 $115,367 $599,498
9 1/1/2025 $566,745 $4,049 $136,019 $706,813
10 2/1/2025 $657,474 $4,697 $157,794 $819,965
11 3/1/2025 $753,885 $5,385 $180,932 $940,202
12 4/1/2025 $852,957 $6,093 $204,710 $1,063,760
13 5/1/2025 $950,582 $6,790 $228,140 $1,185,512
14 6/1/2025 $1,041,710 $7,441 $250,010 $1,299,161
15 7/1/2025 $1,120,741 $8,006 $268,978 $1,397,725
16 8/1/2025 $1,182,128 $8,445 $283,711 $1,474,284
17 9/1/2025 $1,221,117 $8,723 $293,068 $1,522,908
18 10/1/2025 $657,229 $4,697 $157,735 $819,661
Total $11,245,614 $80,334 $2,698,947 $14,024,895*
All amounts shown above are in nominal dollars.
*Interconnection Facilities Payment (Interconnection Facilities Costs $11,245,614 + One-Time Cost $80,334 +
ITCC $2,698,947) = $14,024,895 (based on Estimated Cost)
b. Financial Security Schedule
i. Interconnection Financial Security
The Interconnection Customer shall provide to SCE Interconnection Financial Security in
the total amounts specified in Section b.i of Exhibit B of this Agreement by the dates as
provided below.
.
.
Item 10 Page 26 of 29
27
Interconnection
Financial
Security (IFS)
Interconnection
Facilities
ITCC Total Amount Due Date
IFS amount
required
pursuant to this
Agreement
$11,325,948
$2,698,947 $2,000,000
Within thirty
calendar days
of the
Effective Date
Total $11,325,948 $2,698,947 $2,000,000
The Interconnection Financial Security posted by the Interconnection Customer in
accordance with this Agreement shall be applied towards the Interconnection Customer’s
obligation to post Interconnection Financial Security pursuant to the WDAT Section 8.
.
.
Item 10 Page 27 of 29
28
EXHIBIT D
MILESTONES
SCE will include a list of relevant milestones applicable to the Work.
Item Milestone Responsible
Party Due Date
(b) Submittal of written authorization to
proceed with design and procurement
of the Distribution Provider’s
Interconnection Facilities,
Distribution Upgrades and Network
Upgrades to SCE
Interconnection
Customer
Within thirty (30)
Calendar Days after the
Effective Date of this
Agreement
(c) Submittal of posting of
Interconnection Financial Security for
the Distribution Provider’s
Interconnection Facilities,
Distribution Upgrades and Network
Upgrades to SCE, pursuant to Section
b.i of Exhibit C of this Agreement
Interconnection
Customer
In accordance with the
schedule in Section b.i of
Exhibit C of this
Agreement
(e) Submittal of Tax Security for the
estimated tax liability to SCE,
pursuant to Section b.ii of Exhibit C
of this Agreement
Interconnection
Customer
In accordance with the
schedule in Section b.ii
of Exhibit C of this
Agreement
(f) Submittal of initial specifications for
the Interconnection Customer’s
Interconnection Facilities including
System Protection Facilities
Interconnection
Customer
Within thirty (30)
Calendar Days after the
Effective Date of this
Agreement
(g) Review of and comment on the
Interconnection Customer’s initial
specifications
SCE
Within thirty (30)
Calendar Days after the
Interconnection
Customer’s submission
of initial specifications
(h) Submittal of initial information
including SCE’s Transmission
System information necessary to
allow the Interconnection Customer
to select equipment SCE
Within ninety (90)
Calendar Days after the
Effective Date of this
Agreement
(i) Submittal of final specifications for
the Interconnection Customer’s
Interconnection Facilities including
System Protection Facilities, to SCE
Interconnection
Customer
At least twelve (12)
months prior to
completion of the
Distribution Provider’s
Interconnection
Facilities, Distribution
.
.
Item 10 Page 28 of 29
29
Item Milestone Responsible
Party Due Date
Upgrades and Network
Upgrades
(j) Review of and comment on the
Interconnection Customer’s final
specifications
SCE
Within thirty (30)
Calendar Days after the
Interconnection
Customer’s submission
of final specifications
(k) Submittal of updated information by
the Interconnection Customer,
including manufacturer information Interconnection
Customer
No later than one
hundred eighty (180)
Calendar Days prior to
Trial Operation
(l) Completion of the Distribution
Provider’s Interconnection Facilities *
SCE
Within thirty-six (36)
months following the
Effective Date of this
Agreement
(m) In -Service Date* Interconnection
Customer May 1, 2027
* Note: SCE shall use commercially reasonable efforts to complete the Work described in Exhibit
A to support a May 1, 2027, In-Service Date assuming this Agreement is executed by April 30,
2024; however, pursuant to Section 4 of the Agreement, the timeline in this Exhibit D is
dependent on the Interconnection Customer coordinating with SCE to complete the milestones as
specified in a timely manner. SCE does not warrant that such Work will be completed in time to
meet such date, and the Interconnection Customer acknowledges and understands that such date
is only an estimate and therefore, SCE shall not be liable for any cost or damage incurred by the
Interconnection Customer as a result of or due to any delay in the completion of the Work
provided for in this Agreement. In the event SCE reasonably expects that it will not be able to
complete the Distribution Provider’s Interconnection Facilities, by the specified date, SCE shall
promptly provide written notice to the Interconnection Customer and shall undertake
commercially reasonable efforts to meet the earliest date thereafter.
.
.
Item 10 Page 29 of 29
City Council Agenda Report
Meeting Date:April 16, 2024
From:Carlos Fandino, City Administrator
Department:City Administration
Submitted by:Angela Kimmey, Deputy City Administrator
Subject
Services Agreement with Renne Public Policy Group for Legislative and Regulatory Advocacy
Recommendation
Approve and authorize the City Administrator to execute a Professional Services Agreement with
Renne Public Policy Group (RPPG), in substantially the same form as submitted, for legislative
and regulatory advocacy services for a total amount not-to-exceed $447,000 for a three-year
term.
Background
The City requires the services of a third-party firm to provide legislative, regulatory, and
administrative advocacy on the full spectrum of legislative and regulatory proposals that could
impact the City’s overall operations, specifically with expertise in public health and utility services.
Such advocacy services are necessary to remain apprised of important legislative and regional
issues that may impact the City in a positive or negative way, to protect the City’s interests and
to identify resources available to enhance City Services and programs. To that end, and pursuant
to Vernon Municipal Code (VMC) Section 3.32.080, on January 25, 2024, City Administration
issued a Request for Proposals (RFP) for Legislative and Regulatory Advocacy Services. In
general, the scope of work included in the RFP consisted of monitoring legislation, providing
testimony, developing strategy, working with California administrative agencies, attending and
participating in legislative and regulatory conference calls and meetings, arranging meetings, and
providing regular updates to City staff. Under the direction of the City Administrator, the selected
firm will assist the City in developing and successfully pursuing its legislative and funding
priorities.
Pursuant to VMC Section 3.32.130, the RFP was posted on the PlanetBids online platform and
emailed to 13 qualified firms in compliance. In response to the RFP, four proposals were received
by the March 4, 2024 deadline. The written proposals were subject to a review process by city
staff with knowledge of the City’s legislative and regulatory needs. Individual scores were applied
by members of the selection panel using the evaluation criteria set forth in the RFP. At the
conclusion of the assessment, Renne Public Policy Group (RPPG) emerged as the best suited
firm to meet the city’s legislative and regulatory advocacy needs as communicated through the
RFP.
Based on the results of the RFP process, staff recommends approval of a three-year agreement
with RPPG to provide legislative and regulatory advocacy services for the City. As noted in their
proposal, RPPG is partnering with Emanuels Jones and Associates to meet the City’s diverse
needs for expertise in general city legislation, and also specialty expertise in public health and
utilities including support for grant funding identification. As noted in RPPG’s proposal, by the
end of 2024, the Legislature will have fully turned over since 2012. This provides an opportunity
for Vernon and VPU to establish new relationships both inside and outside the City’s legislative
delegation. Increased legislative engagement will enable the city to develop robust relationships
with legislative leaders, the Administration, key state agencies, staff, and regulatory bodies. To
leverage this opportunity, RPPG will conduct an educational tour at the Capitol, guided by the
.
.
Item 11 Page 1 of 2
City’s legislative priorities, to drive awareness on the issues of greatest importance to the city
and promote the city’s efforts to grow and evolve. This will better position the city for successful
funding requests.
The proposed agreement has been reviewed and approved as to form by the City Attorney’s
Office. City Council approval of the proposed agreement is required pursuant to VMC Section
3.32.030 (A) as it exceeds $100,000.
Fiscal Impact
The fiscal impact is not-to-exceed $447,000 over the three-year term of the agreement. The cost
for the proposed services agreement will be shared between City Administration and the Public
Utilities Department (VPU) with a $49,000 annual cost allocated to City Administration and
$100,000 to VPU. Sufficient funds are available in General Fund, City Administration
Department, Professional Services Account No. 011-010-105-529215 and Electric Enterprise
Fund, Professional Services Account No. 055-050-580-529215 for the current fiscal year and will
be budgeted in subsequent years.
Attachments
1. Services Agreement – Renne Public Policy Group
.
.
Item 11 Page 2 of 2
SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND RENNE PUBLIC
POLICY GROUP FOR LEGISLATIVE AND REGULATORY ADVOCACY SERVICES
COVER PAGE
Contractor: Renne Public Policy Group
Responsible Principal of Contractor: Jon Holtzman, Founding Partner
Notice Information - Contractor: Renne Public Policy Group
1127 11th Street, Suite 300
Sacramento, CA 95814
Attention: Dane Hutchings, Director
Telephone: (916) 230-6935
Notice Information - City: City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
Attention: Carlos R. Fandino, Jr.,
City Administrator
Telephone: (323) 583-8811 ext. 228
Commencement Date: April 16, 2024
Termination Date: April 15, 2027
Consideration: Total not to exceed $447,000 (includes all
applicable sales tax); and more particularly
described in Exhibit B
Records Retention Period Three (3) years, pursuant to Section 11.20
.
.
Item 11 Page 1 of 39
SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND RENNE PUBLIC POLICY
GROUP FOR LEGISLATIVE AND REGULATORY ADVOCACY SERVICES
This Agreement is made between the City of Vernon, a California charter City and
California municipal corporation (“City”), and Renne Public Policy Group, a division of Renne
Public Law Group, a California Limited Liability Partnership (“Contractor”).
The City and Contractor agree as follows:
1.0 EMPLOYMENT OF CONTRACTOR. City agrees to engage Contractor to
perform the services as hereinafter set forth as authorized by the City Council on April 16, 2024.
2.0 SCOPE OF SERVICES.
2.1 Contractor shall perform all work necessary to complete the services set
forth in the City’s Request for Proposals issued on or about January 25, 2024, and titled
Legislative and Regulatory Advocacy Services, and Contractor's proposal to the City
("Proposal") dated March 4, 2024, Exhibit “A”, a copy which is attached to and incorporated into
this Agreement by reference.
2.2 All services shall be performed to the satisfaction of City.
2.3 All services shall be performed in a competent, professional, and
satisfactory manner in accordance with the prevailing industry standards for such services.
3.0 PERSONNEL.
3.1 Contractor represents that it employs, or will employ, at its own expense,
all personnel required to perform the services under this Agreement.
3.2 Contractor shall not subcontract any services to be performed by it under
this Agreement without prior written approval of City.
3.3 All of the services required hereunder will be performed by Contractor or
by City approved subcontractors. Contractor, and all personnel engaged in the work, shall be
fully qualified and authorized or permitted under State and local law to perform such services
and shall be subject to approval by the City.
4.0 TERM. The term of this Agreement shall commence on April 16, 2024, and it shall
continue until April 15, 2027, unless terminated at an earlier date pursuant to the provisions
thereof.
5.0 COMPENSATION AND FEES.
5.1 Contractor has established rates for the City of Vernon which are
comparable to and do not exceed the best rates offered to other governmental entities in and
around Los Angeles County for the same services. For satisfactory and timely performance of
Services Agreement Renne Public Policy Group
Page 2 of 39
.
.
Item 11 Page 2 of 39
the services, the City will pay Contractor in accordance with the payment schedule set forth in
Exhibit “B” attached hereto and incorporated herein by reference.
5.2 Contractor's grand total compensation for the entire term of this
Agreement, shall not exceed $447,000 without the prior authorization of the City, as appropriate,
and written amendment of this Agreement.
5.3 Contractor shall, at its sole cost and expense, furnish all necessary and
incidental labor, material, supplies, facilities, equipment, and transportation which may be
required for furnishing services pursuant to this Agreement. Materials shall be of the highest
quality. The above Agreement fee shall include all staff time and all clerical, administrative,
overhead, insurance, reproduction, telephone, air travel, auto rental, subsistence, and all related
costs and expenses.
5.4 City shall reimburse Contractor only for those costs or expenses
specifically approved in this Agreement, or specifically approved in writing in advance by City.
Unless otherwise approved, such costs shall be limited and include nothing more than the
following costs incurred by Contractor:
5.4.1 The actual costs of subcontractors for performance of any of the
services that Contractor agrees to render pursuant to this Agreement, which have been
approved in advance by City and awarded in accordance with this Agreement.
5.4.2 Approved reproduction charges.
5.4.3 Actual costs and/or other costs and/or payments specifically
authorized in advance in writing and incurred by Contractor in the performance of this
Agreement.
5.5 Contractor shall not receive any compensation for extra work performed
without the prior written authorization of City. As used herein, “extra work” means any work that
is determined by City to be necessary for the proper completion of the Project, but which is not
included within the Scope of Services and which the parties did not reasonably anticipate would
be necessary at the time of execution of this Agreement. Compensation for any authorized
extra work shall be paid in accordance with the payment schedule as set forth in Exhibit “B,” if
the extra work has been approved by the City.
5.6 Licenses, Permits, Fees, and Assessments. Contractor shall obtain, at
Contractor’s sole cost and expense, such licenses, permits, and approvals as may be required
by law for the performance of the services required by this Agreement. Contractor shall have the
sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and
Services Agreement Renne Public Policy Group
Page 3 of 39
.
.
Item 11 Page 3 of 39
interest, which may be imposed by law and which arise from or are necessary for the
performance of the Services by this Agreement.
6.0 PAYMENT.
6.1 As scheduled services are completed, Contractor shall submit to the
City an invoice for the services completed, authorized expenses, and authorized extra work
actually performed or incurred according to said schedule.
6.2 Each such invoice shall state the basis for the amount invoiced, including
a detailed description of the services completed, the number of hours spent, reimbursable
expenses incurred and any extra work performed.
6.3 Contractor shall also submit a progress report with each invoice that
describes in reasonable detail the services and the extra work, if any, performed in the
immediately preceding calendar month.
6.4 Contractor understands and agrees that invoices which lack sufficient
detail to measure performance will be returned and not processed for payment.
6.5 City will pay Contractor the amount invoiced within thirty (30) days after
the City approves the invoice.
6.6 Payment of such invoices shall be payment in full for all services,
authorized costs, and authorized extra work covered by that invoice.
7.0 CITY'S RESPONSIBILITY. City shall cooperate with Contractor as may be
reasonably necessary for Contractor to perform its services; and will give any required decisions
as promptly as practicable so as to avoid unreasonable delay in the progress of Contractor's
services.
8.0 COORDINATION OF SERVICES. Contractor agrees to work closely with City
staff in the performance of Services and shall be available to City’s staff, consultants, and other
staff at all reasonable times.
9.0 INDEMNITY. Contractor agrees to indemnify City, its officers, elected officials,
employees and agents against, and will hold and save each of them harmless from, any and all
actions, suits, claims, damages to persons or property, losses, costs, penalties, obligations,
errors, omissions or liabilities (herein “claims or liabilities”), including but not limited to
professional negligence, that may be asserted or claimed by any person, firm or entity arising
out of or in connection with the work, operations or activities of Contractor, its agents,
employees, subcontractors, or invitees, provided for herein, or arising from the acts or
omissions of Contractor hereunder, or arising from Contractor’s performance of or failure to
perform any term, provision, covenant or condition of this Agreement, except to the extent such
Services Agreement Renne Public Policy Group
Page 4 of 39
.
.
Item 11 Page 4 of 39
claims or liabilities arise from the gross negligence or willful misconduct of City, its officers,
elected officials, agents or employees.
10.0 INSURANCE. Contractor shall, at its own expense, procure and maintain
policies of insurance of the types and in the amounts set forth below, for the duration of the
Agreement, including any extensions thereto. The policies shall state that they afford primary
coverage.
i. Automobile Liability with minimum limits of at least $1,000,000 combined single
limit, including owned, hired, and non-owned liability coverage.
ii. Contractor agrees to subrogate automobile liability resulting from performance
under this Agreement by agreeing to defend, indemnify and hold harmless, the City, and its
respective employees, agents, and City Council from and against all claims, liabilities, suits,
losses, damages, injuries and expenses, including all costs and reasonable attorney’s fees
(“Claims”), which are attributable to any act or omission by the Contractor under the
performance of the services.
iii. General Liability with minimum limits of at least $1,000,000 per occurrence and
$2,000,000 aggregate written on an Insurance Services Office (ISO) Comprehensive General
Liability "occurrence" form or its equivalent for coverage on an occurrence
basis. Premises/Operations and Personal Injury coverage is required. The City of Vernon, its
directors, commissioners, officers, employees, agents, and volunteers must be endorsed on the
policy as additional insureds as respects liability arising out of the Contractor's performance of
this Agreement.
(1) If Contractor employs other contractors as part of the services rendered,
Contractor's Protective Coverage is required. Contractor may include all
subcontractors as insureds under its own policy or shall furnish separate
insurance for each subcontractor, meeting the requirements set forth
herein.
(2) Contractor agrees to subrogate General Liability resulting from
performance under this Agreement by agreeing to defend, indemnify and
hold harmless, the City, and its respective employees, agents, and City
Council from and against all claims, liabilities, suits, losses, damages,
injuries and expenses, including all costs and reasonable attorney’s fees
(“Claims”), which are attributable to any act or omission by the City under
the performance of the services.
iv. Professional Errors and Omissions coverage in a sum of at least $1,000,000,
Services Agreement Renne Public Policy Group
Page 5 of 39
.
.
Item 11 Page 5 of 39
where such risk is applicable. Applicable aggregates must be identified and claims history
provided to determine amounts remaining under the aggregate. Contractor shall maintain such
coverage for at least one (1) year after the termination of this Agreement.
v. Excess Coverage – Any umbrella or excess insurance shall contain or be
endorsed to contain a provision that such coverage shall also apply on a primary and non-
contributory basis for the benefit of City. Any umbrella liability policy or excess liability policy will
in “following form” and will contain a provision to the effect that, if the underlying aggregate is
exhausted, the excess coverage will drop down as primary insurance.
vi. Contractor shall comply with the applicable sections of the California Labor Code
concerning workers' compensation for injuries on the job. In addition, Contractor shall require
each subcontractor to similarly maintain workers’ compensation insurance in accordance with
the laws for California for all of the subcontractor’s employees. Compliance is accomplished in
one of the following manners:
(1) Provide copy of permissive self-insurance certificate approved by the
State of California; or
(2) Secure and maintain in force a policy of workers' compensation insurance
with statutory limits and Employer's Liability Insurance with a minimal limit
of $1,000,000 per accident. The policy shall be endorsed to waive all
rights of subrogation against City, its directors, commissioners, officers,
employees, and volunteers for losses arising from performance of this
Agreement; or
(3) Provide a "waiver" form certifying that no employees subject to the Labor
Code's Workers' Compensation provision will be used in performance of
this Agreement.
vii. Each insurance policy included in this clause shall be endorsed to state that
coverage shall not be cancelled except after thirty (30) days' prior written notice to City.
viii. Insurance shall be placed with insurers with a Best's rating of no less than A-VIII.
ix. Prior to commencement of performance, Contractor shall furnish City with a
certificate of insurance for each policy. Each certificate is to be signed by a person authorized
by that insurer to bind coverage on its behalf. The certificate(s) must be in a form approved by
City. City may require complete, certified copies of any or all policies at any time.
x. Failure to maintain required insurance at all times shall constitute a default and
material breach. In such event, Contractor shall immediately notify City and cease all
performance under this Agreement until further directed by the City. In the absence of
Services Agreement Renne Public Policy Group
Page 6 of 39
.
.
Item 11 Page 6 of 39
satisfactory insurance coverage, City may, at its option: (a) procure insurance with collection
rights for premiums, attorney's fees and costs against Contractor by way of set-off or
recoupment from sums due to Contractor, at City's option; (b) immediately terminate this
Agreement and seek damages from the Agreement resulting from said breach; or (c) self-insure
the risk, with all damages and costs incurred, by judgment, settlement or otherwise, including
attorney's fees and costs, being collectible from Contractor, by way of set-off or recoupment
from any sums due to Contractor.
11.0 GENERAL TERMS AND CONDITIONS.
11.1 INDEPENDENT CONTRACTOR.
11.1.1 It is understood that in the performance of the services herein
provided for, Contractor shall be, and is, an independent contractor, and is not an agent, officer
or employee of City and shall furnish such services in its own manner and method except as
required by this Agreement, or any applicable statute, rule, or regulation. Further, Contractor
has and shall retain the right to exercise full control over the employment, direction,
compensation and discharge of all persons employed by Contractor in the performance of the
services hereunder. City assumes no liability for Contractor’s actions and performance, nor
assumes responsibility for taxes, bonds, payments, or other commitments, implied or explicit, by
or for Contractor. Contractor shall be solely responsible for, and shall indemnify, defend and
save City harmless from all matters relating to the payment of its employees, subcontractors
and independent contractors, including compliance with social security, withholding and all other
wages, salaries, benefits, taxes, exactions, and regulations of any nature whatsoever.
11.1.2 Contractor acknowledges that Contractor and any subcontractors,
agents or employees employed by Contractor shall not, under any circumstances, be
considered employees of the City, and that they shall not be entitled to any of the benefits or
rights afforded employees of City, including, but not limited to, sick leave, vacation leave,
holiday pay, Public Employees Retirement System benefits, or health, life, dental, long-term
disability or workers' compensation insurance benefits.
11.2 CONTRACTOR NOT AGENT. Except as the City may authorize
in writing, Contractor and its subcontractors shall have no authority, express or implied, to act
on behalf of or bind the City in any capacity whatsoever as agents or otherwise.
11.3 OWNERSHIP OF WORK. All documents and materials furnished by the
City to Contractor shall remain the property of the City and shall be returned to the City upon
termination of this Agreement. All reports, drawings, plans, specifications, computer tapes,
floppy disks and printouts, studies, memoranda, computation sheets, and other documents
Services Agreement Renne Public Policy Group
Page 7 of 39
.
.
Item 11 Page 7 of 39
prepared by Contractor in furtherance of the work shall be the sole property of City and shall be
delivered to City whenever requested at no additional cost to the City. Contractor shall keep
such documents and materials on file and available for audit by the City for at least three (3)
years after completion or earlier termination of this Agreement. Contractor may make duplicate
copies of such materials and documents for its own files or for such other purposes as may be
authorized in writing by the City.
11.4 CORRECTION OF WORK. Contractor shall promptly correct any
defective, inaccurate or incomplete tasks, deliverables, goods, services and other work, without
additional cost to the City. The performance or acceptance of services furnished by Contractor
shall not relieve the Contractor from the obligation to correct subsequently discovered defects,
inaccuracy, or incompleteness.
11.5 RESPONSIBILITY FOR ERRORS. Contractor shall be responsible for its
work and results under this Agreement. Contractor, when requested, shall furnish clarification
and/or explanation as may be required by the City, regarding any services rendered under this
Agreement at no additional cost to City. In the event that an error or omission attributable to
Contractor occurs, then Contractor shall, at no cost to City, provide all necessary design
drawings, estimates and other Contractor professional services necessary to rectify and correct
the matter to the sole satisfaction of City and to participate in any meeting required with regard
to the correction.
11.6 WAIVER. The City's waiver of any term, condition, breach, or default of
this Agreement shall not be considered to be a waiver of any other term, condition, default or
breach, nor of a subsequent breach of the one waived. The delay or failure of either party at any
time to require performance or compliance by the other of any of its obligations or agreements
shall in no way be deemed a waiver of those rights to require such performance or compliance.
No waiver of any provision of this Agreement shall be effective unless in writing and executed
by a duly authorized representative of the party against whom enforcement of a waiver is
sought.
11.7 SUCCESSORS. This Agreement shall inure to the benefit of, and shall
be binding upon, the parties hereto and their respective heirs, successors, and/or assigns.
11.8 NO ASSIGNMENT. Contractor shall not assign or transfer this
Agreement or any rights hereunder without the prior written consent of the City and approval by
the City Attorney, which may be withheld in the City's sole discretion. Any unauthorized
assignment or transfer shall be null and void and shall constitute a material breach by the
Services Agreement Renne Public Policy Group
Page 8 of 39
.
.
Item 11 Page 8 of 39
Contractor of its obligations under this Agreement. No assignment shall release the original
parties from their obligations or otherwise constitute a novation.
11.9 COMPLIANCE WITH LAWS. Contractor shall comply with all Federal,
State, County and City laws, ordinances, rules and regulations, which are, as amended from
time to time, incorporated herein and applicable to the performance hereof. Violation of any law
material to performance of this Agreement shall entitle the City to terminate the Agreement and
otherwise pursue its remedies. Further, if the Contractor performs any work knowing it to be
contrary to such laws, rules, and regulations Contractor shall be solely responsible for all costs
arising therefrom.
11.10 ATTORNEY'S FEES. If any action at law or in equity is brought to
enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to
reasonable attorney's fees, costs, and necessary disbursements in addition to any other relief to
which such party may be entitled.
11.11 INTERPRETATION.
11.11.1 Applicable Law. This Agreement shall be deemed an
agreement and shall be governed by and construed in accordance with the laws of the State of
California. Contractor agrees that the State and Federal courts which sit in the State of
California shall have exclusive jurisdiction over all controversies and disputes arising hereunder,
and submits to the jurisdiction thereof.
11.11.2 Entire Agreement. This Agreement, including any exhibits
attached hereto, constitutes the entire agreement and understanding between the parties
regarding its subject matter and supersedes all prior or contemporaneous negotiations,
representations, understandings, correspondence, documentation, and agreements (written or
oral).
11.11.3 Written Amendment. This Agreement may only be changed
by written amendment executed by Contractor and the City Administrator or other authorized
representative of the City, subject to any requisite authorization by the City Council. Any oral
representations or modifications concerning this Agreement shall be of no force or effect.
11.11.4 Severability. If any provision in this Agreement is held by any
court of competent jurisdiction to be invalid, illegal, void, or unenforceable, such portion shall be
deemed severed from this Agreement, and the remaining provisions shall nevertheless continue
in full force and effect as fully as though such invalid, illegal, or unenforceable portion had never
been part of this Agreement.
Services Agreement Renne Public Policy Group
Page 9 of 39
.
.
Item 11 Page 9 of 39
11.11.5 Order of Precedence. In case of conflict between the terms of
this Agreement and the terms contained in any document attached as an Exhibit or otherwise
incorporated by reference, the terms of this Agreement shall strictly prevail. The terms of the
City’s Request for Proposals shall control over the Contractor’s Proposal.
11.11.6 Construction. In the event an ambiguity or question of intent
or interpretation arises with respect to this Agreement, this Agreement shall be construed as if
drafted jointly by the parties and in accordance with its fair meaning. There shall be no
presumption or burden of proof favoring or disfavoring any party by virtue of the authorship of
any of the provisions of this Agreement.
11.12 TIME OF ESSENCE. Time is strictly of the essence of this agreement
and each and every covenant, term, and provision hereof.
11.13 AUTHORITY OF CONTRACTOR. The Contractor hereby represents
and warrants to the City that the Contractor has the right, power, legal capacity, and authority to
enter into and perform its obligations under this Agreement, and its execution of this Agreement
has been duly authorized.
11.14 ARBITRATION OF DISPUTES. Any dispute for under $25,000
arising out of or relating to the negotiation, construction, performance, non-performance,
breach, or any other aspect of this Agreement, shall be settled by binding arbitration in
accordance with the Commercial Rules of the American Arbitration Association at Los Angeles,
California and judgment upon the award rendered by the Arbitrators may be entered in any
court having jurisdiction thereof. The City does not waive its right to object to the timeliness or
sufficiency of any claim filed or required to be filed against the City and reserves the right to
conduct full discovery.
11.15 NOTICES. Any notice or demand to be given by one party to the other
must be given in writing and by personal delivery or prepaid first-class, registered or certified
mail, addressed as follows. Notice simply to the City of Vernon or any other City department is
not adequate notice.
If to the City:
City of Vernon
Attention: Carlos R. Fandino, Jr.
City Administrator
4305 Santa Fe Avenue
Vernon, CA 90058
Services Agreement Renne Public Policy Group
Page 10 of 39
.
.
Item 11 Page 10 of 39
If to the Contractor:
Renne Public Policy Group
Attention: Jon Holtzman, Founding Partner
1127 11th Street, Suite 300
Sacramento, CA 95814
Any such notice shall be deemed to have been given upon delivery, if personally
delivered, or, if mailed, upon receipt, or upon expiration of three (3) business days from the date
of posting, whichever is earlier. Either party may change the address at which it desires to
receive notice upon giving written notice of such request to the other party.
11.16 NO THIRD PARTY RIGHTS. This Agreement is entered into for the sole
benefit of City and Contractor and no other parties are intended to be direct or incidental
beneficiaries of this Agreement and no third party shall have any right or remedy in, under, or to
this Agreement.
11.17 TERMINATION FOR CONVENIENCE (Without Cause). City may
terminate this Agreement in whole or in part at any time, for any cause or without cause, upon
fifteen (15) calendar days' written notice to Contractor. If the Agreement is thus terminated by
City for reasons other than Contractor's failure to perform its obligations, City shall pay
Contractor a prorated amount based on the services satisfactorily completed and accepted prior
to the effective date of termination. Such payment shall be Contractor's exclusive remedy for
termination without cause.
11.18 DEFAULT. In the event either party materially defaults in its obligations
hereunder, the other party may declare a default and terminate this Agreement by written notice
to the defaulting party. The notice shall specify the basis for the default. The Agreement shall
terminate unless such default is cured before the effective date of termination stated in such
notice, which date shall be no sooner than ten (10) days after the date of the notice. In case of
default by Contractor, the City reserves the right to procure the goods or services from other
sources and to hold the Contractor responsible for any excess costs occasioned to the City
thereby. Contractor shall not be held accountable for additional costs incurred due to delay or
default as a result of Force Majeure. Contractor must notify the City immediately upon knowing
that non-performance or delay will apply to this Agreement as a result of Force Majeure. At that
time Contractor is to submit in writing a Recovery Plan for this Agreement. If the Recovery Plan
is not acceptable to the City or not received within 10 days of the necessary notification of Force
Majeure default, then the City may cancel this order in its entirety at no cost to the City, owing
only for goods and services completed to that point.
Services Agreement Renne Public Policy Group
Page 11 of 39
.
.
Item 11 Page 11 of 39
11.19 TERMINATION FOR CAUSE. Termination for cause shall relieve the
terminating party of further liability or responsibility under this Agreement, including the payment
of money, except for payment for services satisfactorily and timely performed prior to the service
of the notice of termination, and except for reimbursement of (1) any payments made by the City
for service not subsequently performed in a timely and satisfactory manner, and (2) costs
incurred by the City in obtaining substitute performance. If this Agreement is terminated as
provided herein, City may require, at no additional cost to City, that Contractor provide all
finished or unfinished documents, data, and other information of any kind prepared by
Contractor in connection with the performance of Services under this Agreement. Contractor
shall be required to provide such document and other information within fifteen (15) days of the
request.
11.19.1 Additional Services. In the event this Agreement is terminated in
whole or in part as provided herein, City may procure, upon such terms and in such manner as
it may determine appropriate, services similar to those terminated.
11.20 MAINTENANCE AND INSPECTION OF RECORDS.
The City, or its authorized auditors or representatives, shall have access
to and the right to audit and reproduce any of the Contractor's records to the extent the City
deems necessary to insure it is receiving all money to which it is entitled under the Agreement
and/or is paying only the amounts to which Contractor is properly entitled under the Agreement
or for other purposes relating to the Agreement.
The Contractor shall maintain and preserve all such records for a period
of at least three (3) years after termination of the Agreement.
The Contractor shall maintain all such records in the City of Vernon. If
not, the Contractor shall, upon request, promptly deliver the records to the City of Vernon or
reimburse the City for all reasonable and extra costs incurred in conducting the audit at a
location other than the City of Vernon, including, but not limited to, such additional (out of the
City) expenses for personnel, salaries, private auditors, travel, lodging, meals, and overhead.
11.21 CONFLICT. Contractor hereby represents, warrants, and certifies that no
member, officer, or employee of the Contractor is a director, officer, or employee of the City of
Vernon, or a member of any of its boards, commissions, or committees, except to the extent
permitted by law.
11.22 HEADINGS. Paragraphs and subparagraph headings contained in this
Agreement are included solely for convenience and are not intended to modify, explain or to be
Services Agreement Renne Public Policy Group
Page 12 of 39
.
.
Item 11 Page 12 of 39
a full or accurate description of the content thereof and shall not in any way affect the meaning
or interpretation of this Agreement.
11.23 ENFORCEMENT OF WAGE AND HOUR LAWS. Eight hours labor
constitutes a legal day's work. The Contractor, or subcontractor, if any, shall forfeit twenty-five
dollars ($25) for each worker employed in the execution of this Agreement by the respective
Contractor or subcontractor for each calendar day during which the worker is required or
permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar
week in violation of the provisions of Sections 1810 through 1815 of the California Labor Code
as a penalty paid to the City; provided, however, work performed by employees of contractors in
excess of 8 hours per day, and 40 hours during any one week, shall be permitted upon
compensation for all hours worked in excess of 8 hours per day at not less than 1½ times the
basic rate of pay.
11.24 EQUAL EMPLOYMENT OPPORTUNITY PRACTICES. Contractor
certifies and represents that, during the performance of this Agreement, it and any other parties
with whom it may subcontract shall adhere to equal employment opportunity practices to assure
that applicants, employees and recipients of service are treated equally and are not
discriminated against because of their race, religion, color, national origin, ancestry, disability,
sex, age, medical condition, sexual orientation or marital status. Contractor further certifies that
it will not maintain any segregated facilities. Contractor further agrees to comply with The Equal
Employment Opportunity Practices provisions as set forth in Exhibit “C”.
[Signatures Begin on Next Page].
Services Agreement Renne Public Policy Group
Page 13 of 39
.
.
Item 11 Page 13 of 39
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the
Commencement Date stated on the cover page.
City of Vernon, a California charter City
and California municipal corporation
By: ____________________________
Carlos R. Fandino, Jr.,
City Administrator
Renne Public Policy Group, a California LLP
By:
Name:
Title:
ATTEST:
_______________________________
Yonnie Parker, Deputy City Clerk
By:
Name:
Title:
APPROVED AS TO FORM:
_______________________________
Zaynah N. Moussa,
City Attorney
Services Agreement Renne Public Policy Group
Page 14 of 39
Jonathan V. Holtzman
Managing Partner
.
.
Item 11 Page 14 of 39
EXHIBIT A
CONTRACTOR'S PROPOSAL
Services Agreement Renne Public Policy Group
Page 15 of 39
.
.
Item 11 Page 15 of 39
1
PROPOSAL FOR
LEGISLATIVE AND REGULATORY ADVOCACY SERVICES
CITY OF VERNON
Prepared by:
Dane Hutchings
Managing Director
Phone: (916) 974-9270
dhutchings@publicpolicygroup.com
Services Agreement Renne Public Policy Group
Page 16 of 39
.
.
Item 11 Page 16 of 39
1 The City of Vernon, Legislative and Regulatory Advocacy Services
COVER LETTER
March 4, 2024
City of Vernon
Attention: Angela Kimmey, Deputy City Administrator
4305 Santa Fe Avenue
Vernon, CA 90058
Re: Legislative and Regulatory Advocacy Services
Dear Ms. Kimmey:
On behalf of Renne Public Law Group, LLP [DBA: Renne Public Policy Group], we are pleased to
submit our proposal for Legislative and Regulatory Advocacy Services for the City of Vernon.
Renne Public Policy Group (RPPG) is a full-service state lobbying and consulting practice that
advocates for the best interests of public entities and those organizations that align with public
entities. We do so effectively and efficiently, without compromising on ethics or integrity. R PPG
is a division of Renne Public Law Group (RPLG), a law firm that primarily represents local public
agencies.
RPPG draws from the wisdom of respected former public officials, the knowledge of municipal
funding and policy experts, and the tenacity of experienced legislative advocates to provide a
uniquely tailored service for your specific
needs and goals. We believe we are the best
choice for the City of Vernon because our
experience with and firsthand knowledge of
local agency operations is combined with a
diverse team that understands your region and
can provide you a critically important seat at
the table. Our powerhouse team of legislative,
policy, funding, and technical experts is well-
positioned with extensive networks in the
Capitol and a stellar record of legislative
successes. We provide responsive, concierge-
level service that will keep you informed and
empowered at every step of the way, and our
team’s steadfast advocacy and passion for
local government are unsurpassed.
Services Agreement Renne Public Policy Group
Page 17 of 39
.
.
Item 11 Page 17 of 39
2 The City of Vernon, Legislative and Regulatory Advocacy Services
Jon Holtzman
Founding Partner
Renne Public Law Group, LLP®
As detailed further in this proposal, at RPPG we customize our approach to fit your needs, amplify
your voice through sustained, timely communications, and comb through the State Budget
assessing potential funding prospects. We would anticipate your opport unities and challenges
based on our local agency-specific policy experience and advocate for Vernon’s needs with
tenacity and grit. In short, we provide our clients with a holistic approach to legislative, political,
communications, funding, and operational counsel. We refer to this as our “wraparound service
approach.” In addition, we intend to subcontract with Kyra Ross, Principal at Emanuels, Jones
and Associates, LLC. Kyra’s direct policy expertise in the areas of electrical utilities and public
health complements RPPG’s policy-based, detail-oriented approach. The proposal narrative
includes more information about our team’s specific roles and responsibilities.
Dane Hutchings, Managing Director, will act as the project supervisor and primary contact for
this proposal; he can be reached by phone at (916) 916-230-6935 or e-mail at
dhutchings@publicpolicygroup.com. RPPG’s Founding Partner Jon Holtzman has the authority to
negotiate on behalf of and bind the firm in an agreement and can be reached at (415) 848 -7200.
RPPG will perform the services and adhere to the requirements as described in this RFP. This
proposal is valid 90 days from the submittal date.
Firm Contact Information
Regards,
Renne Public Law Group, LLP
350 Sansome Street, Floor 3
San Francisco, CA 94104
(415) 848-7200
Billing will be handled out of the San
Francisco office.
Renne Public Policy Group
1127 11th Street, Suite 300
Sacramento, CA 95814
(916) 974-9270
All other services will be primarily
performed out of the Sacramento office.
Dane Hutchings
Managing Director
Renne Public Policy Group, A Division
of Renne Public Law Group, LLP
Services Agreement Renne Public Policy Group
Page 18 of 39
.
.
Item 11 Page 18 of 39
3 The City of Vernon, Legislative and Regulatory Advocacy Services
INTRODUCTION
The RPPG legislative , regulatory and grant advocacy practice area is led by Managing Director
Dane Hutchings. He is supported by seasoned legislative advocates Alyssa Silhi and Sharon
Gonsalves (proposed co -leads). As detailed further in this proposal, RPPG’s Policy and
Strategic advisors support our clients’ overall advocacy strategy by providing unique and
experienced perspectives on the real -world impacts of pending legislative, regulatory, and
administrative proposals ––leveraging their experience for the betterment of RPPG clients.
More details regarding specific roles, responsibilities, and qualifications for each member of
the RPPG team are provided in the following sections.
GENERAL SCOPE OF WORK
The City of Vernon is seeking qualified and talented representation at the state level to serve as
its eyes, ears, and voice and successfully advocate on behalf of the City of Vernon and Vernon
Public Utilities (VPU). The team selected will be an integral part of the City’s overall advocacy
efforts and an important element of the City’s work to engage with key stakeholders of interest.
The scope of services requested is robust and requires legislative, regulatory, and administrative
advocacy on the full spectrum of legislative and regulatory proposals that could impact the City’s
overall operations and public health and utility services. With such a complex issue portfolio,
Vernon has unique opportunities to further partner with the State of California as well as
potential challenges to meet as the City’s population continues to grow.
Our firm’s understanding of the services requested, general approach, and proposed
methodologies and strategies needed to achieve them is set forth in this proposal.
Agency Understanding: City of Vernon
The City of Vernon covers 5.2 square miles located 5 miles south of downtown Los Angeles
and prides itself on being a “prime location for business .” The City is primarily composed of
industrial areas, with a prevalence of warehouses and meatpacking plants. Despite its
relatively small geographical size, the City provides a complex array of in-house services,
including water, electric, natural gas , and broadband utility service s through VPU as well as
Vernon’s Department of Health and Environmental Control (DHEC).
Given its heavy concentration of industrial uses, Vernon ranks in the 98th percentile in
CalEnviroScreen with 4.0 for pollution burden. The City has been taking considerable steps
to address impacts attributed to climate change , including implementing resilience efforts
to mitigate air pollution and nu isance odors and initiating an environmental sustainability
action plan study in Spring 2023.
With 222 residents as of the 2020 U.S. Census count, Vernon is the second least populous
city in California. According to the state Department of Parks and Recreation, 100% of
Vernon residents live in areas with less than 3 acres of parks or open space per 1,000
residents. Upon initial review , our assessment is that Vernon qualifies both as a
Services Agreement Renne Public Policy Group
Page 19 of 39
.
.
Item 11 Page 19 of 39
4 The City of Vernon, Legislative and Regulatory Advocacy Services
disadvantaged community and an AB 1550 low -income community through the California
Climate Investments Priority Populations tool. This provides unique opportunities for the
City as it continue s to seek regional, state and federal resources .
In 2022, Vernon’s leadership launched the Reimagine Vernon initiative to develop a new
Westside Specific Plan intended to facilitate new development and adaptive reuse. Based
on currently available drafts of the Specific Plan EIR, the proposed zoning reforms will
facilitate the development of 874 new residential units —a considerable increase in total
city population—and create 360,429 sq. feet of office/research and development and
253,021 sq . feet of production retail. The Specific Plan would decrease Vernon’s industrial
footprint by more than 575,000 sq . feet.
Vernon receives th e majority of its revenues from a combination of sales taxes, parcel
taxes, and utility user taxes ; only 7% of its FY 2023 revenue came from property taxes.
Major Challenges and Items of Special Consideration
Business Partnerships + General Government: Vernon values local control and the ability to
conduct operations in a way that maximizes value to the community, protects infrastructure
investments, and strengthens its deep partnerships with its strong industrial base. We have a
deep understanding of the policies that are important to shared goals of the City and its trusted
partners. This gives Vernon the unique advantage of having a team that can explore opportunities
for collaboration while remaining focused on the City’s best interests.
With respect to governance, several legislative measures have proposed eroding operational and
legal autonomy for local government. From new avenues of litigation to costly new (unfunded)
mandates, lawmakers have set their sights on local revenues to fund new mandates and
programs.
Energy: Vernon Public Utilities (VPU) and California municipal utilities will likely face several
challenges related to energy in 2024 and beyond; the first involves ongoing discussions regarding
electricity costs. Municipal utilities continue working toward meeting RPS and zero-carbon
targets while procuring enough energy and containing costs for ratepayers. Ongoing efforts
include discussions with Senate and Assembly legislative leadership and the California Energy
Commission on the rapidly increasing costs associated with new renewable energy contracts and
the rising costs of Renewable Energy Credits that must be addressed to facilitate our long -term
clean energy progress. Ongoing discussions and legislation to build out California’s energy
transmission system, including EV charging facilities, will also be a major issue in 2024
Water + Solid Waste: The State continues to seek solutions on many issues of interest to VPU,
including water allocation, water quality standards, water conservation, greenhouse gas
reduction, and sustainable solid waste disposal practices. Often, these proposals diminish the
role of local agencies in the decision-making process and reduce local control. Furthermore, the
State often oversaturates compliance and reporting requirements by creating new mechanisms
and programs that impose an additional burden on local agencies to provide data or complicate
rather than streamlining existing regulatory processes. It will be important for the City’s advocacy
Services Agreement Renne Public Policy Group
Page 20 of 39
.
.
Item 11 Page 20 of 39
5 The City of Vernon, Legislative and Regulatory Advocacy Services
team to work with the Department to monitor proposals that alter existing regulations and to
work to streamline them where appropriate.
WORK PLAN
The RPPG Strategic Approach
Our client service model is unique, particularly when compared with the way most contract
governmental affairs firms conduct business. The RPPG brand is founded on delivering superior
work product quality and a “white glove” service experience. Our goal is to make you feel like
our only client, every time. We are enthusiastic, passionate local government advocates who
deliver tenacious representation and consistent, tailored, and timely communication.
The art of advancing critical needs on one front while defending local decision -making on
another requires an exceptional in -depth understanding of the client’s needs, accompanied
by strong personal relationships with key decision -makers. While legislative and regulatory
advocacy has many facets, our overarching advocacy strategy and approach is grounded in
these principles:
Proactive Engagement: Building on a solid foundation of your goals and key messaging, RPPG
will continually engage early and often with key decision -makers and like-minded
stakeholders throughout the legislative process, during the interim recesses, and between
legislative sess ions. This includes consistent communication with your legislative delegation
on items of concern and opportunity, as well as proactive engagement with relevant
committee chairs, key legislative leaders, consultants, Administration of ficials, and outside
advocacy organizations to identify opportunities for a blended advocacy strategy that both
enhances and protects your interests.
Creative Solutions: The success of advancing legislative or fiscal proposals, negotiating
amendments, and mounting a coordinated public affairs campaign when necessary is often
determined by the approach taken to achieve results. We avoid one-size-fits-all solutions and
instead assess the full landscape for your specific circumstances and needs. This enables us
to provide the proper guidance, messaging, and on -the-ground maneuvering that extends
well beyond the cookie-cutter solutions frequently provided in California politics.
The Ability to Pivot Throughout the Political Process: We have curated a team of strategic
operatives with a depth of experience in various policy arenas, from former high -ranking
Capitol staff and committee consultants to former elected officials and legislative advocates
for the League of California Cities and California Special Districts Association. Our bro ad
professional network is collectively leveraged to accomplish our client ’s objectives. Due to
our rich and diverse political and professional backg rounds, we have worked on virtually
every single issue affecting local jurisdictions at some point in time.
We are nimble professionals with the ability to get up to speed quickly on client -specific policy
issues and to engage effectively with stakeholders and lawmakers. When one door closes, we
are able to find another to open so that we can continue to advance your priorities. Our
Services Agreement Renne Public Policy Group
Page 21 of 39
.
.
Item 11 Page 21 of 39
6 The City of Vernon, Legislative and Regulatory Advocacy Services
signature work ethic, determination, agility, and solid policy background keep us one step
ahead of the opposition, ensuring that your needs and concerns are heard, seen, and
successfully advanced within the legislative process.
A Tenacious Work Ethic and Passion for Local Government: Advocacy is a field that rewards
persistence, experience, and hard work. Each principal at RPPG performs the work as
specified in the client contract; we go above and beyond to deliver a customized product
based on your individual needs. Our principal staff are local government experts —each
comes from local government or has extensive experience successfully engaging in the myriad
policies that impact public agencies. We will work to intimately unders tand the challenges
facing Vernon and its Department staff and deeply value the critical role you play in your
community. This enables us to help develop your distinctive voice, share your story, and
advance your goals more efficiently.
Effective Communication: At RPPG, we understand you do not merely want to have a voice
in Sacramento, but also require that voice to communicate in a manner authentic to your
City, accurately reflect ing your priorities and values. We work tremendously hard for our
clients because each client who partners with RPPG has placed their trust in us to represent
their interests in the state Capitol and also be a reliable messenger of their brand and story.
In addition, we provide you with the tools to communicate directly with your Council,
community members, and regional partners and stakeholders about how Vernon is using its
voice in Sacramento. We achieve this through frequent client contact and consistent
accountability, including monthly detailed reports of our activities on your behalf, monthly
legislative memos and priority bill lists, and memos detailing significant ben chmarks
throughout the year, such as Budget Act updates and legislative deadlines, so that your staff,
leaders, and community understand the value of investing in a robust advocacy program.
Methodologies
We believe in a smart, focused approach to lobbying in Sacramento. Our experience proves that
carefully selecting a few top priorities and bringing the best minds to work on them typically
bears fruit. We are proud of our dexterity in navigating legislation through the Appropriation and
Budget processes, and our well-established professional relationships enable us to call on the
legislators and key staff who analyze, debate, and decide the fate of many fiscal bills. We spend
significant time meeting with decision-makers and educating legislators about our client’s needs
and interests throughout the full spectrum of the policy development process. More specifically,
we propose to meet your objectives in the following ways.
State Legislative and Regulatory Engagement, Tracking, and Advocacy. RPPG will track, review,
and analyze any introduced and amended legislation and advocate on legislation and any State
Budget issues impacting Vernon and its Departments, including the VPU and DHEC. We will assist
in evaluating proposed legislation and identifying priorities based upon the ir potential impact,
and we will consult on and develop strategic documents that include draft policy and regulatory
positions, budgetary letters, a priority legislative tracking matrix customized according to your
specifications, budget analysis, and background papers to ensure that you are kept informed of
Services Agreement Renne Public Policy Group
Page 22 of 39
.
.
Item 11 Page 22 of 39
7 The City of Vernon, Legislative and Regulatory Advocacy Services
the latest developments and that your voice is heard by policymakers and stakeholders. In
addition, RPPG will assist in developing, drafting, and sponsoring state legislation and
amendments needed to advance your goals and priorities.
Participate and Advise in Annual Legislative Strategic Planning. Establishing a proactive strategy
plays an important role in your overall success. Through a series of “deep dive” meetings, RPPG
will work with the City’s staff and leadership to discuss and identify whom to include internally
in discussions to determine goals, objectives, opportunities, and challenges related to Vernon’s
priorities. We will use this information to develop an annual and multi -year legislative strategic
plan that reflects your unique organizational needs.
Explore Potential Funding Opportunities, General Fund. With State budget deficits, being
projected at close to $80 Billion for FY -24-25, direct General Fund earmarks will be limited if
not entirely eliminated in the short term. That is why it is critical that Vernon partner with a
team that has a proven track record of securing funding through the Federal Community
Project Program, as well as through other federal, state, and regional grant opportunities .
Our proposed team is composed of diverse professiona ls who have secured over $265 million
in federal, state, and reginal funding in just over the past 4 years alone . We will work with
your staff to identify General Fund, community projects and grant opportunities to explore
any viable funding opportunity —leaving no stone unturned . (Please note that our team will
assist in grant identification as a complementary service offering. Should the City of Vernon
wish to enlist our firm for grant writing and research services, this would require an amended
scope of work and change in pricing.)
Representation. RPPG will represent the City and its Departments at policy-related meetings,
conferences, events, regulatory proceedings, legislative hearings, and other appropriate venues
to deliver comments and testimony and give you a consistent presence in the Capitol.
Frequent, Reliable Communication. Keeping you fully informed is a top priority. Our team will
provide regular written and verbal communications and updates to keep Vernon and the VPU up
to date on our advocacy efforts, individual tasks, and timeline for meeting milestones. Regular
communication between Vernon and our team will also ensure that we are responsive to the
direction of your Council and staff throughout the entire State Budget and legislative processes.
This will include monthly written policy status and activity reports, along with more in -depth
reports and recaps during each major milestone throughout the legislative year (e.g., every
budget milestone, bill introduction deadline, house of origin deadline, summer recess, and end
of session). We will supplement these reports with an updated legislative matrix and, during the
legislative session, a monthly check-in via Zoom with City staff where we will review legislation
and brief you on the latest developments.
Relationship Building. By the end of 2024, the Legislature will have fully turned over since 2012.
This provides an opportunity for Vernon and VPU to establish new relationships both inside and
Services Agreement Renne Public Policy Group
Page 23 of 39
.
.
Item 11 Page 23 of 39
8 The City of Vernon, Legislative and Regulatory Advocacy Services
outside its legislative delegation. RPPG will build on your presence in Sacramento to assist in
further developing robust relationships with legislative leaders, the Administration, key state
agencies, staff, and regulatory bodies. We will continue to foster our relationships within your
state legislative delegation, the Governor’s Office, California Natural Resources Agency,
California Air Resources Board, CalRecycle, State Water Resources Control Board, Department of
Water Resources, and other departments and agencies with funding programs, regulations, or
initiatives that may intersect with your identified needs and priorities. Our firm will make meeting
recommendations, schedule arrangements, and strategize in advance on messaging. This
approach ensures that we have laid the groundwork for Vernon’s bill proposals year over year.
Educational Tour. Guided by your legislative priorities, RPPG is prepared to conduct an
educational tour in the Capitol to drive awareness on the issues of greatest importance to
Vernon. This will ensure that the appropriate communication channels with legislative staff and
legislators remain open throughout the 2024-2025 legislative session and beyond.
Targeted Engagement with Statewide Local Government Association , Trade Association and
Local Agency Partners. RPPG has strong contacts and proven working relationships with the
League of California Cities, California Contract Cities Association, California Special Districts
Association, California Municipal Utilities Association, Southern California Public Power
Association, Association of California Water Agencies, California Association of Sanitation
Agencies, WateReuse Association, Regional Water Authority, Solid Waste Association of North
America–California Chapters, California Product Stewardship Council, California State Association
of Counties, Rural Counties Representatives of California, Urban Counties of California, and other
statewide and regional advocacy organizations whose interests overlap Vernon’s. These
relationships will ensure that we can effectively communicate your policy positions to RPPG’s
partners in these associations and agencies—and, when appropriate, incorporate a blended
strategy—to achieve success on all matters of import to Vernon and VPU.
Other Stakeholder Engagement. To advance your budget and legislative priorities, RPPG will
secure the support of potential stakeholders, including identifying, prioritizing, leading outreach
efforts to relevant stakeholders, and building and working with related coalitions. Our experience
working with organized labor and the business industry will best position the City and to help
meet both short- and long-term goals.
FPPC. RPPG will file all required forms on behalf of Vernon, including but not limited to forms 602
(annual Lobbying Firm Activity Authorization) and 635 (Report of Lobbyist Employer).
QUALIFICATIONS AND EXPERIENCE
We recognize that the needs of public agencies differ significantly. While many issues of
interest affect all public agencies, RPPG is fluent in the nuances of the policy areas and
Services Agreement Renne Public Policy Group
Page 24 of 39
.
.
Item 11 Page 24 of 39
9 The City of Vernon, Legislative and Regulatory Advocacy Services
governmental operations that should be monitored and assessed for possible engagement
on behalf of the City of Vernon and VPU.
The following examples illustrate the accomplishments of the RPPG team members proposed
for Vernon. Each example includes a detailed summary of specific work in advancing policy
and administrative issues on behalf of our public sector clients throughout California.
CLIENT: City of Mountain View
Demonstrated Skills: Stopping Detrimental Legislation, Advancing Sponsored Legislation
(which included securing an author outside the client’s represented delegation), Strategic
Partnerships and Coalition Building, Issue Area Proficiency: Transportation policy.
AB 971 (Lee) Vehicles: Transit -Only Traffic Lanes (2023 –2024 Legislative Session)
Sponsoring a piece of legislation allows the client to have more ownership throughout the
legislative process —as the client will act as the lead in both drafting the proposed policy and
leading the negotiations with all stakeholders throughout the entire y ear. Typically speaking,
lawmakers representing the client’s jurisdiction would introduce such a proposal; however,
when the client requested the bill, the City’s delegation had already committed to other
organizations and had reached their respective bill limit for the year. In response, RPPG was
able to secure an author outside our client’s legislative delegation despite the author’s not
representing the City. AB 971 (Lee, D -Milpitas) supports Mountain View’s efforts in furthering
its North Bayshore Preci se Plan by opening up the specific types of mass transit vehicles
eligible to use the City’s reversible transit lane project along Shoreline Boulevard (upon
project completion). The ability to permit Mountain View’s fare -free transit operation was
critical to the City’s ability to meet the required capacity threshold needed to move forward
with the project. AB 971 was signed into law.
Client Contact: Christina Gilmore, Intergovernmental Relations Manager
Phone Number: (650) 903-6215
Email Address: christina.gilmore@mountainview.gov
Address: 500 Castro St., Mountain View, CA 94041
Years Performed: 2021-Present (ongoing)
CLIENT: Burbank-Glendale -Pasadena Airport Authority (Hollywood Burbank Airport)
Demonstrated Skills: Legislative and Executive Advocacy, Strategic Partnerships and Coalition
Building; Issue Area Proficiency: Airport Operations, Revenue Generation, Personal Vehicle
Sharing
AB 893 (Papan) Personal Vehicle Sharing Programs. (Authority Position, Support, 2022–2023
Legislative Session )
AB 893 is a measure that aims to provide equity in the post -airport transit space. This measure
applies the same customer facility charges (CFCs) on “personal vehicle sharing programs”
Services Agreement Renne Public Policy Group
Page 25 of 39
.
.
Item 11 Page 25 of 39
10 The City of Vernon, Legislative and Regulatory Advocacy Services
(e.g., peer-to-peer platforms, Turo, etc.). CFCs are collected to pay for the use of an airport -
mandated common use bus or light rail transit system operated for the movement of
passengers between the terminal and a consolidated on -airport rental car facil ity. The fees
typically pay off the bonded indebtedness incurred by the airport for the construction of the
facility. Peer-to-peer platforms claimed that they were not subject either to permitting
requirements or CFCs that apply to rental car companies and other forms of transit. The lack
of regulation creates an inequitable marketplace. On behalf of Hollywood Burbank Airport,
we engaged in support of AB 893. We worked with the California Airports Council, California
Labor Federation, California Teamsters P ublic Affairs Council, and others to steer AB 893
through the legislative process. In addition, our team met with the Governor’s legislative staff
to convey support —even prior to the measure officially advancing to his desk. This strategy
was used to ensure that the Administration did not have any last -minute technical
amendments that could have warranted a veto. As a result, AB 893 was signed by Governor
Newsom.
Client Contact: Pamela Marcello, Legislative Director
Phone: (818) 524-3828
Email: pmarcello@Bur.org
Address: 2627 N. Hollywood Way, Burbank, CA 91505
Years Performed: 2023 – Present (ongoing)
CLIENT: City of Santa Rosa
Demonstrated Skills: Strategic Communications, State Budget Advocacy, Issue Area
Proficiency: Navigating the State Budget Process
(Demonstrated Skills: Strategic Partnerships and Coalition Building, Advocating on
Detrimental Legislation; Issue Area Proficiency: Water Resources)
SB 1157 (Hertzberg) Urban water use objectives (City Position, Oppose, 2021-2022
Legislative Session )
SB 1157 circumvented a previously agreed -upon legislative package thoughtfully negotiated
by impacted stakeholders by incrementally lowering the standard for indoor residential water
use to 47 gallons per capita per day (gpcd) starting Jan. 1, 2025, and 42 gpcd beginning Jan.
1, 2030. However, due to the robust advocacy efforts of a broad coalition of stakeholders,
which RPPG participated in, the measure was significantly amended several times throughout
the process to:
• Require the Department of Water Resources (DWR) in coordination with the State
Water Resources Control Board (SWRCB) to conduct studies and investigations to
assess and quantify the economic benefit and impacts of meeting the 2030 indoor
residential use st andard on water, wastewater, and recycled water systems;
• Summarize the findings in a report to the Legislature by Jan. 1, 2027;
Services Agreement Renne Public Policy Group
Page 26 of 39
.
.
Item 11 Page 26 of 39
11 The City of Vernon, Legislative and Regulatory Advocacy Services
• Prohibit enforcement of specified provisions against an urban retail water supplier
solely for failing to meet the indoor residential use standard;
• Allow DWR and SWRCB to recommend an alternate date for the 2030 standard to take
effect if they determine the 2030 indoor residential use standard is likely to unduly
impact affordability of water and wastewater services; and
• Require DWR to consider whether to recommend additional variances to
accommodate unique challenges related to residential indoor water use based on
findings for adoption by SWRCB.
RPPG represented the City’s interests against SB 1157 as part of a robust coalition of
stakeholders led by the Association of California Water Agencies (ACWA). The City remained
opposed despite many stakeholder associations taking a neutral position, and R PPG
continued efforts with ACWA and a smaller subset of partners to hold the bill, working the
Appropriations committees, key legislative leaders, and the Floor. RPPG collaborated with
City staff on a coordinated outreach strategy to the City’s delegation, including Senate
Majority Leader Mike McGuire. In the process, additional amendments were procured in
response to the significant concerns raised surrounding impacts on affordability and
feasibility. The City removed its opposition to the measure upon sec uring additional
amendments.
Client Contact: Scott Alonso, Government Affairs Officer
Phone: (707) 543-4624
Email: salonso@srcity.org
Address: 637 First Street, Santa Rosa, CA 95404
Year Performed: 2020-Present (ongoing)
CLIENT: City of Bakersfield
Demonstrated Skills: Monitoring Rule -Making Procedures and Client Communication; Issue
Area Proficiency: Regulatory Oversight, Zero -Emission Vehicle Policy
Advanced Clean Fleets Regulation (2022–2023 )
Like most local agencies, the City of Bakersfield is significantly impacted by the California Air
Resources Board (CARB) Advanced Clean Fleets Regulations. These regulations dictate how
private and public fleets will transition to Zero Emission Vehicles (Z EVs) in coming years, in
compliance with the climate goals established in Governor Newsom’s Executive Order N -79-
20. The mandate for local government agencies —including cities —begins Jan. 1, 2024, with
benchmarks set for compliance thereafter. RPPG monitored the rule -making process for the
City, advising on the latest pending developments, comment periods, and potentia l impacts.
Once CARB voted to adopt the final regulations, the City could not find a digestible resource
that presented the regulatory provisions in an easily understood and accessible manner for
the staff who would be required to ensure compliance. In res ponse, RPPG produced a
“cheat sheet” document for our clients’ use that distilled the complex 38 -page final ruling
Services Agreement Renne Public Policy Group
Page 27 of 39
.
.
Item 11 Page 27 of 39
12 The City of Vernon, Legislative and Regulatory Advocacy Services
document into a 9 -page chart for agencies’ easy reference in tracking their progress in the
transition to compliance.
Client Contact: Anthony Valdez, Assistant to the City Manager
Phone: (661) 326-3029
Email: avaldez@bakersfieldCity.us
Address: 1600 Truxtun Avenue, Bakersfield, CA 93301
Years Performed: 2021 – Present (ongoing)
FEES AND COSTS
$15,000.00 Per Month $180,000.00 Annually
$5,000.00 (not to exceed annual,
travel)
Total not-to-exceed: $185,000.000
RPPG proposes a flat monthly retainer fee for all services outlined for both the City of
Vernon and the Vernon Public Utilities . This pricing includes all work performed by RPPG
primary staff, subcontractors, advisors, operational and administrative support as detailed
as well as inclusive of all costs associated with the quarterly filings required by the Fair
Political Practices Commission. Please note that the $5,000.00 not -to-exceed annual travel
would only be used in connected with client -request travel outside of the Sacramento
Metropolitan Region (e.g., air travel, h otel, transportation etc. associated with a requested
in-person meeting). No travel -related expenses shall be assessed unless specifically
requested and approved by the client.
Renne Public Policy Group List of All Current Clients
Note: Unless otherwise indicated , all clients listed below are contracted with RPPG for
direct State legislative advocacy services (lobbying).
• All clients listed with a single asterisk (*) symbol are grant writing only clients.
• All clients listed with two asterisks (**) symbol s are combined grant writing and
lobbying clients .
• All clients listed with a plus (+) symbol are legislative tracking (non-lobbying) clients.
California Alliance for Jobs*
California Association of Recreation and
Parks Districts
City Clerks Association of California
City of Bakersfield**
City of Beaumont**
City of Belmont
City of Brisbane*
City of Carlsbad
City of Corona**
City of Eastvale
City of El Cerrito**
Services Agreement Renne Public Policy Group
Page 28 of 39
.
.
Item 11 Page 28 of 39
13 The City of Vernon, Legislative and Regulatory Advocacy Services
City of Foster City
City of Greenfield*
City of Hidden Hills+
City of Merced
City of Morgan Hill*
City of Mountain View**
City of Rancho Cucamonga**
City of Rancho Palo s Verdes
City of Redwood City**
City of Roseville Environmental Utilities
Dept.
City of San Bernardino*
City of Santa Rosa**
City of Westlake Village+
Hollywood Burbank Airport Authority
Housing Authority of San Bernardino*
San Bernardino Community College
District*
YMCA Silicon Valley*
Town of Hillsboroug h
Current Client List for RPPG Subcontractor: Emanuels Jones & Associates, LLC
Capito l Area Development Authority
City of Burbank
City of Coronado
City of Glendale
City of Los Angeles+
City of Pasadena
City of San Marcos
City of Solana Beach
City of Stockton
San Raf ael/Marin County Council of
Mayors & Council Members
Town of Mammoth Lakes
Town of Truckee
Navigating Conflicts (RPPG’s Formal Policy)
For the most part, the interest s of local government s typically align. However, from time to
time, issues may arise that split the interest s of local government s. At RPPG, we pride
ourselves on finding ways to balance the interest s of our client s regardless of the issue.
Should one client take a formal position on legislation that may conflict with another
client’s adopted position, we evaluate the nature of the conflict with each client and, if
appropriate, our firm implements the following process.
1. Clear and Timely Communication of the Actual or Perceived Conflict: As soon as we are
aware of the potential conflict, we immediately inform client or clients. The issue or
issues in question are assigned to a single RPPG lobbyist and dedicated support team.
2. Ethical Wall Formed: All communication with respect to legislative activity, strategy or
any active direct or indirect advocacy efforts on the matter at hand are immediately
“walled off” from one another until such time that the matter has resolved.
3. Short -Term Issue-Specific Subcontractor: In the event that after the steps above have
been enacted and the City is not satisfied, our firm would be open to exploring other
options that may provide the City with more assurance , including identifying and
retaining a suitable subcontractor on a short -term basis specific to the singular issue at
no additional cost to the City until the matter is resolved. To date, no client has ever felt
the need to request this action. Note: Our proposal includes a reputable subcontractor
who is qualified to represent Vernon’s interests of the City.
Services Agreement Renne Public Policy Group
Page 29 of 39
.
.
Item 11 Page 29 of 39
14 The City of Vernon, Legislative and Regulatory Advocacy Services
ABILITY OF THE PROPOSER TO PERFORM
Lobbying Team (Primary Staff)
Dane Hutchings, Managing Director
APPLICABLE EXPERIENCE: AT A GLANCE
• Over 15 years of legislative advocacy and public affairs
experience representing various business and local government
entities
• Former Legislative Representative and Federal Policy Liaison,
League of California Cities
• Strong relationships with key legislative, administrative, and
executive branch officials
• Registered lobbyist with the State of California; B.A. in Public
Affairs, California State University, Sacramento; M.P.P., New
England College
For over 15 years, Dane Hutchings has been advocating for the best interests of both public
and private entities. He is a seasoned legislative advocate and political strategist with a keen
understanding of the California political process and landscape. As Managing Director of
RPPG, Dane has successfully advanced policies for clients in several areas of importance
including natural resources, land use, revenue and taxation, homelessness, and emergency
response. Dane is located in Sacramento.
He has demonstrated success in effectively navigating the State Budget process to secure
millions in one-time earmarks for RPPG clients. Recently, Dane — with support from the RPPG
team — secured $15 million in the FY23 -24 State Budget, despite historic de ficits. In 2022, he
secured nearly $40 million in one -time funding for RPPG clients.
Prior to launching RPPG in 2019, Dane worked for the League of California Cities . As a
Legislative Representative and Federal Policy Liaison , he acted as the key strategist, advisor,
and advocate on issues including labor relations policies, privacy and technology,
governmental transparency, the Brown Act, workers’ compensation, and other issues related
to local government operations. As the Fede ral Policy Liaison, Dane worked across multiple
policy areas of importance to local government, including public safety, infrastructure,
housing, and environmental policy. In conjunction with the National League of Cities, Dane
advocated for increased HUD funding for the State Community Development Block Grant
funding and other federal programs that local agencies rely upon.
While at the California Grocers Association, Dane represented over 300 members in the retail
food and supplier industry. He specialized in labor and employment, healthcare, retail food
and general business issues. Dane worked directly with local government al bodies, staff and
their organizations on local and statewide policies that ensured continuity for his clients while
preserving local government authority.
Services Agreement Renne Public Policy Group
Page 30 of 39
.
.
Item 11 Page 30 of 39
15 The City of Vernon, Legislative and Regulatory Advocacy Services
Dane’s direct experience in public affairs provides a distinctive approach on how an effective
issue-based “inside -outside” communications/advocacy strategy can support legislative
priorities by providing political cover for legislators as well as the Gove rnor’s office. Dane
spent 4 years working as an Account Executive and Government Relations Advocate at
Ogilvy—a premier and influential multi -national public affairs and advocacy firm. Dane
engaged in multiple issue -based campaigns specifically designed to support legislative
strategies for private sector clients in the industrial, energy and automotive sectors.
In 2011, Dane was asked to join the crisis communications team for Mexico’s Secretaria De
Turismo, working with national and international publications, private companies, and
government officials to drive key economic development, travel and trade goals .
Alyssa Silhi, Director of Government Affairs
APPLICABLE EXPERIENCE: AT A GLANCE
• Over 15 years of governmental affairs and public relations
experience
• Former Legislative Representative, California Special Districts
Association
• Strong background in natural resources and environmental
policy
• Former elected Council Member and Special District Board
Member
• Registered lobbyist with the State of California; B.A. in both
English and Communications, University of California, Davis
Alyssa has been advancing statewide policies for the public good for over 15 years . She is a
proven strategist with a reputation for balancing tenacity and effectiveness with strong ethics
and skillful communication to get the job done. Alyssa is located in Sacramento.
As an experienced former City Council Member and Air Pollution Control District Board
Member, Alyssa has firsthand insight into the mechanisms of operating and maintaining
reliable and regulatorily compliant municipal utility services. She brings this keen
understanding of the nuances of local agency operations to her work in advocating on issues
of importance to public agencies .
Prior to joining RPPG in early 2022, Alyssa was a Legislative Representative for the California
Special Districts Association (CSDA), where she was the lead advocate and strategist on policy
and fiscal proposals related to utility services – including solid waste and recycling, water,
wastewater, and water quality – and environmental policy, emergency response and
preparedness, public works, and public contracting.
While at CSDA, Alyssa successfully navigated the politics of the State Budget process to secure
a cumulative $1.42 billion in state funding, including $20 million in Public Safety Power
Shutoff state grant funds for special districts with critical infrastructur e and $100 million in
COVID -19 funding relief for impacted districts. She played a critical role in the coalition that
Services Agreement Renne Public Policy Group
Page 31 of 39
.
.
Item 11 Page 31 of 39
16 The City of Vernon, Legislative and Regulatory Advocacy Services
secured utility arrearage relief, resulting in $1 billion for water and wastewater services and
nearly $300 million for publicly owned utilities.
Sharon Gonsalves , Director of Government Affairs
APPLICABLE EXPERIENCE: AT A GLANCE
• Over 15 years of legislative advocacy and Capitol staff
experience
• Strong policy background in natural resources and water issues
• Proven track record in advising clients on the successful
procurement of federal and state grant funding
• Skilled in successfully navigating the State Budget process
• Registered lobbyist with the State of California; B.A. in
Communications Studies, California State University, Monterey
Sharon has spent her career advocating for legislative and funding priorities of municipalities
throughout California and brings over 15 years of state legislative and Capitol staff experience to
the RPPG team. She has a stellar track record of leveraging her strong relationships in the Capitol,
Administration, and key government agencies to advance her clients’ goals. Her expertise covers
the policy sectors of natural resources and water, both as a former legislative staff member and
legislative advocate. Sharon is located in Sacramento.
Having spent nearly a decade working in both houses of the Legislature, Sharon has a unique
understanding of and experience in navigating California’s complex budget process. This has
proved critical when advocating for increased funding for conservation e fforts and other
environmental protections through the State Budget process, Cap and Trade, and bond -related
legislation. She is adept in leveraging her relationships in the Legislature to secure State Budget
earmarks for her clients.
Prior to joining RPPG in 2020, Sharon was a Senior Associate at Townsend Public Affairs
representing local public agency clients, specializing in those from California’s severely
disadvantaged regions. She has helped secure millions of dollars for critical infrastructure and
public safety improvements. In that position, Sharon worked on behalf of her most
disadvantaged clients to secure the passage of SB 200, the Safe and Affordable Drinking Water
Fund (Monning) [Chapter 120, Statutes of 2019], which requires the annual transfer of 5 per-cent
of the Greenhouse Gas Reduction Fund (GGRF) into the Fund until June 30, 2030.
On behalf of the City of Turlock, Sharon lobbied the Administration, Legislature, and state
and federal agencies on the North Valley Regional Recycled Water Project (NVRRWP) and the
Stanislaus Regional Water Authority (SRWA). Her efforts included coordinat ing multiple
advocacy trips to meet with key members of the Administration’s cabinet, members of both
legislative houses, committee staff, and members of State Water Resources Control Board
(SWRCB) to increase support and discuss funding opportunities. As a result, she was able to
secure $4.3 million from the Bureau of Reclamation for the NVRRWP and $30 million for
SRWA through Proposition 68 in 2018.
Services Agreement Renne Public Policy Group
Page 32 of 39
.
.
Item 11 Page 32 of 39
17 The City of Vernon, Legislative and Regulatory Advocacy Services
Sharon has utilized the relationships she has built over the years in her work advocating on behalf
of public agencies. Under Governor Newsom’s Administration, she works frequently with key
policy advisors in state agencies, including the Natural Resources Agency and California Air
Resources Board (CARB).
Kyra Emanuels Ross — President of Emanuels Jones & Associates (RPPG Subcontractor)
APPLICABLE EXPERIENCE: AT A GLANCE
• Over 25 years of legislative advocacy and Capitol staff experience
• Former Chief Consultant , Assembly Natural Resources Committee
• Policy Expertise in the areas of Utilities, Environment, and Public
Health
• Skilled in successfully navigating the State Budget process
• Registered lobbyist with the State of California; B.A. Political Science,
University of California, Davis
Kyra is President of the lobbying firm Emanuels Jones & Associates. She joined the EJ&A team
in 2012, bringing a wealth of local government, energy and climate policy knowledge as well
as significant Capitol and State Agency experience. She has over 25 years of experience
working in the State legislative, budget, and regulatory environment s.
Kyra began her career in the Legislature, serving over a decade in the Assembly. During that
time, she was the Chief Consultant to the Assembly Natural Resources Committee, where
she was responsible for the daily work and policy setting for the Assembly on environmental
issues, focusing primarily on waste, energy, and climate. Kyra was involved with the drafting
and analysis of major climate -related bills, including AB 32 (2006).
She also served as Senior Legislative Representative for the League of California Cities.
During that time, Kyra was the lead lobbyist dealing with environmental and community
services issue s, including air quality, climate change, cap -and-trade, energy, CEQA, water
supply, water quality, and hazardous and solid waste, and more.
Since 2012, Kyra has served as the principal lobbyist, and now President of Emanuels Jones
& Associates. Over the past decade, she has been instrumental in securing more than $500
million in state funding and grants for clients. Her work includes helping clients navigate the
state legislative and annual State Budget process, obtaining grants through state agencies
and bonds, and navigating the state regulatory process.
Kyra has been vital in client legislative success es. She played an instrumental role in
procuring legislation to provide injunctive relief under CEQA for a new entertainment sports
complex ; establishing a regional housing trust fund along with a $23 million S tate Budget
appropriation to provide funding for affordable housing ; and successfully lobbying the state
for one -time funding to procure a $3 million helicopter for a major city.
RPPG (Non-Lobbying) Advisory Team
Dan Carrigg — Senior Policy and Strategic Advisor , Economic Development
Services Agreement Renne Public Policy Group
Page 33 of 39
.
.
Item 11 Page 33 of 39
18 The City of Vernon, Legislative and Regulatory Advocacy Services
APPLICABLE EXPERIENCE: AT A GLANCE
• 30 years of legislative advocacy experience
• 25 years of specifically advocating for local government ,
including specializing in economic development policy
• Former Deputy Executive Director, League of California Cities
• Strong relationships with agency officials and legislators
• Seasoned legislative advocate and expert in California’s
legislative, political, and budget processes
Dan Carrigg is a political consultant and thought leader in California public policy directly
impacting local government. With wide -ranging experience in legislative analysis, strategy,
and advocacy, and an excellent reputation for hard work, Dan spent nea rly 25 years with the
League of California Cities , beginning as the League’s housing and land use lobbyist, and
holding increasingly responsible advocacy roles including Legislative Director and Deputy
Executive Director. Until retiring from the League in October 2019, Dan supervised its
legislative and public affairs program, developed policy, managed its legislative and public
affairs teams, drafted and reviewed legislation, reviewed and analyzed ballot measures, and
testified before the Legislature. He works remotely.
Dan offers RPPG clients a deep policy background and strong political acumen across a vast
spectrum of issues that impact public agencies , including areas of revenue, taxation, and local
economic development.
Throughout his career, Dan has worked on many high-profile issues, including representing the
League as part of the transportation coalition to pass SB 1 (Beall) [Chapter 5, Statutes of 2017).
Later, he advocated to secure revenue for local governments in Prop 1B, the 2006 transportation
bond, and defeat a legislative effort to take nearly $1 billion in city and county road maintenance
funds.
Prior to his work with the League, Dan drew on his background in construction to represent the
Department of General Services and the Division of the State Architect on state real estate,
construction, and public contracting from 1996 -1998.
Bruce Rudd — Senior Policy and Strategic Advisor , Local Agency Operations
APPLICABLE EXPERIENCE: AT A GLANCE
• 40+ years of Local Agency Expertise
• Policy expertise in the areas of, public utility services including
water, wastewater, recycled water, stormwater, and solid waste .
• Extensive experience in water, environmental, and infrastructure
policy
• B.S. in Business Administration, University of Phoenix
Services Agreement Renne Public Policy Group
Page 34 of 39
.
.
Item 11 Page 34 of 39
19 The City of Vernon, Legislative and Regulatory Advocacy Services
Bruce Rudd is a policy and technical strategic advisor, following 42 years of public service with
the City of Fresno, a full -service city. During that time, he served as the City Manager,
Assistant City Manager, Director of Transportation, Interim Director of Parks and Recreation,
a Board Member for the Fresno Economic Development Corporation, and a Policy Advisory
Board Member for the County of Fresno Council of Governments. Bruce works remotely.
Prior to joining the City Manager’s Office in 2005, Bruce served as Fresno’s Director of
Transportation (1998 -2005); and possesses an extensive background and understanding of
state and federal transportation programs and grants. One of his responsibilitie s as an
Assistant City Manager was to oversee the City’s Public Works, Transportation and Airport
departments, which he continued to perform as City Manager.
While serving as Assistant City Manager and City Manager, Bruce was involved in a number
of projects, programs, and policies related to the manner in which water, wastewater, and
solid waste services were funded and provided. These included “Recharge Fresn o,” a $430
million program that was needed to support the City’s need to transition from groundwater
to sustainable surface water through the construction of a new $250 million, 80 -million gallon
per day surface water treatment plant, and other related cap ital investments. He was also
instrumental in negotiating a new surface water conveyance agreement with the Fresno
Irrigation District and restructuring the City’s existing debt, including that of the City’s Public
Utilities Department, result ing in a $1 million reduction in annual debt service payments and
long-term borrowing costs as none of the debt was extended beyond previous maturity dates.
During his career, Bruce has been responsible for writing and/or administering numerous
federal, state, and local grant programs that have been successfully used to fund a variety of
capital investments. His intimate understanding of municipal government also provides acute
insight as to how changes in legislation or regulations can impact the costs of and/or manner
in which services are provided to the public, specifically with respect to utility operations.
Jake Whitaker – Director of Grant Services
APPLICABLE EXPERIENCE: AT A GLANCE
• Certificated grant writer with over $90 million in funding secured
and 42 successful proposals developed in partnership with
municipal governments, county governments, institutions of
higher education, and nonprofits
• Member of the Grant Professionals Association
• 8 years of experience working in local government
• 4 years of experience as a local government elected official
Jake’s exceptional ability to tell the story of public agencies and nonprofits produces
successful and highly competitive grant applications. These awards include a wide range of
various project types: transportation infrastructure, water system improvemen t, economic
development, public safety and victim service programs, urban greening, wildfire mitigation,
higher education programs, and transitional housing and homelessness service programs.
Services Agreement Renne Public Policy Group
Page 35 of 39
.
.
Item 11 Page 35 of 39
20 The City of Vernon, Legislative and Regulatory Advocacy Services
In 2021, he joined RPPG’s team to build a grant writing practice augmenting the firm’s service
offerings, providing a highly individualized, client -centric consulting service.
Jake served on the Woodland Joint Unified School District’s Board of Trustees for four years.
His experience as a member of a public agency’s governing board, coupled with his
experience as a public agency staffer, give Jake the rare ability to support syn ergy between
the governance team’s goals and staff priorities in building a cohesive grant -seeking effort.
Jake is fluent in submitting applications through grants.gov, JustGrants (Dept. of Justice), the
FEMA GO Grants Portal, the System for Online Application Review (SOAR, used by CNRA),
Submittable (used by OGALS), FastLane (used by NSF), My AmeriCorps, and v arious portal
systems commonly used by philanthropic organizations. He has experience preparing SF -424s
and other federal forms, maintaining active registration status in SAM.gov, and applying the
regulations outlined in 2 CFR Part 170 (commonly referred t o as the OMB “Super Circular”).
Administrative and Legislative Support
RPPG has a robust operational and administrative support team. To adhere to RFP page limits,
we ask that you visit our website to see our full team.
Services Agreement Renne Public Policy Group
Page 36 of 39
.
.
Item 11 Page 36 of 39
March 2013
AFFIDAVIT OF NON-COLLUSION BY CONTRACTOR
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
_______________________________________________________________, being first duly sworn deposes
and says that he/she is ______________________________________________________________________
(Insert "Sole Owner", "Partner", "President, "Secretary", or other proper title)
of______________________________________________________________________________________
(Insert name of bidder)
who submits herewith to the City of Vernon a bid/proposal;
That all statements of fact in such bid/proposal are true;
That such bid/proposal was not made in the interest of or on behalf of any undisclosed person,
partnership, company, association, organization or corporation;
That such bid/proposal is genuine and not collusive or sham;
That said bidder has not, directly or indirectly by agreement, communication or conference with anyone
attempted to induce action prejudicial to the interest of the City of Vernon, or of any other bidder or
anyone else interested in the proposed contract; and further
That prior to the public opening and reading of bids/proposals, said bidder:
a. Did not directly or indirectly, induce or solicit anyone else to submit a false or sham
bid/proposal;
b. Did not directly or indirectly, collude, conspire, connive or agree with anyone else that said
bidder or anyone else would submit a false or sham bid/proposal, or that anyone should refrain
from bidding or withdraw his/her bid/proposal;
c. Did not, in any manner, directly or indirectly seek by agreement, communication or conference
with anyone to raise or fix the bid/proposal price of said bidder or of anyone else, or to raise or
fix any overhead, profit or cost element of his/her bid/proposal price, or of that of anyone else;
d. Did not, directly or indirectly, submit his/her bid/proposal price or any breakdown thereof, or
the contents thereof, or divulge information or data relative thereto, to any corporation,
partnership, company, association, organization, bid depository, or to any member or agent
thereof, or to any individual or group of individuals, except the City of Vernon, or to any person
or persons who have a partnership or other financial interest with said bidder in his/her business.
I certify under penalty of perjury that the above information is correct
By:______________________________________ Title:________________________________
Date:____________________________________
City of Vernon Legislative and Regulatory Advocacy Services Request for
Proposals
Page 13 of 34
____________________________________________________________________________Managing Partner
2/27/2024
Jonathan V. Holtzman
Managing Partner
Renne Public Policy Group
Services Agreement Renne Public Policy Group
Page 37 of 39
.
.
Item 11 Page 37 of 39
EXHIBIT B
FEES AND COSTS
Retainer: $12,000 Per Month
Travel reimbursement: up to $5,000 annually
Annual total not-to-exceed: $149,000
Monthly retainer: Contractor will receive a flat monthly retainer fee for all services outlined for
both the City and the Vernon Public Utilities. This pricing includes all work performed by
Contractor primary staff, subcontractors, advisors, operational and administrative support as set
forth in Contractor’s proposal and inclusive of all costs associated with the quarterly filings
required by the Fair Political Practices Commission.
Travel reimbursement: Any travel-related expenses must be approved by the City in writing and
in advance. The $5,000.00 annual travel budget shall only be used in connection with client-
requested travel outside of the Sacramento Metropolitan Region (e.g., air travel, hotel,
transportation etc. associated with a requested in-person meeting). No travel-related expenses
shall be assessed unless specifically requested and approved by the City.
Services Agreement Renne Public Policy Group
Page 38 of 39
.
.
Item 11 Page 38 of 39
EXHIBIT C
EQUAL EMPLOYMENT OPPORTUNITY
PRACTICES PROVISIONS
A. Contractor certifies and represents that, during the performance of this Agreement, the
contractor and each subcontractor shall adhere to equal opportunity employment practices
to assure that applicants and employees are treated equally and are not discriminated
against because of their race, religious creed, color, national origin, ancestry, handicap,
sex, or age. Contractor further certifies that it will not maintain any segregated facilities.
B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for
employment placed by or on behalf of Contractor, state that it is an "Equal Opportunity
Employer" or that all qualified applicants will receive consideration for employment without
regard to their race, religious creed, color, national origin, ancestry, handicap, sex or age.
C. Contractor agrees that it shall, if requested to do so by the City, certify that it has not, in the
performance of this Agreement, discriminated against applicants or employees because of
their membership in a protected class.
D. Contractor agrees to provide the City with access to, and, if requested to do so by City,
through its awarding authority, provide copies of all of its records pertaining or relating to its
employment practices, except to the extent such records or portions of such records are
confidential or privileged under state or federal law.
E. Nothing contained in this Agreement shall be construed in any manner as to require or
permit any act which is prohibited by law.
Services Agreement Renne Public Policy Group
Page 39 of 39
.
.
Item 11 Page 39 of 39