20250701 Regular City Council Meeting - PacketRegular City Council Meeting Agenda July 1, 2025
Page 1 of 5
Agenda
City of Vernon
Regular City Council Meeting
Tuesday, July 1, 2025, 9:00 AM
City Hall, Council Chamber
4305 Santa Fe Avenue, Vernon, California
Leticia Lopez, Mayor
Melissa Ybarra, Mayor Pro Tem
Jesus Rivera, Council Member
Crystal Larios, Council Member
Judith Merlo, Council Member
The public is encouraged to view the agenda and meeting at CityofVernon.org/publicmeetings. In
the event of any technical difficulties, you may view the live meeting at
www.cityofvernon.org/LiveMeeting.
You may address the Council in the Council Chambers, via mail or email to
PublicComment@cityofvernonca.gov, include the meeting date and item number in the subject line
(mail and/or email must be received at least two hours prior to the start of the meeting).
CALL TO ORDER
FLAG SALUTE
ROLL CALL
APPROVAL OF AGENDA
PUBLIC COMMENT
At this time the public is encouraged to address the City Council on any matter that is within the
subject matter jurisdiction of the City Council. The public will also be given a chance to comment
on matters which are on the posted agenda during City Council deliberation on those specific
matters.
PRESENTATIONS
1. Recognition of Outgoing City Commission and Committee Members
Recommendation:
Present Certificates of Recognition to outgoing Green Vernon Commission and Vernon
CommUNITY Fund Grant Committee Member Clara Gazcon, Vernon CommUNITY Fund
Grant Committee Member Michelle Ybarra, and Vernon Housing Commission Members Juliet
Goff and Steven Froberg.
Regular City Council Meeting Agenda July 1, 2025
Page 2 of 5
CONSENT CALENDAR
All matters listed on the Consent Calendar may be approved with one motion. Items may be
removed from the Consent Calendar for individual consideration. Removed items will be
considered immediately following the Consent Calendar.
2. Meeting Minutes
Recommendation:
Approve the June 17, 2025 Regular City Council Meeting Minutes.
3. Claims Against the City
Recommendation:
Receive and file the claim submitted by Americo Blanco.
4. City Council Appointments to Outside Agencies
Recommendation:
Affirm or modify appointments of representatives and/or alternates to various outside
agencies.
5. Operating Account Warrant Register
Recommendation:
Approve Operating Account Warrant Register No. 153, for the period of May 18, 2025, through
May 31, 2025, totaling $8,248,897.44 and consisting of ratification of electronic payments
totaling $8,013,749.09 and ratification of the issuance of early checks totaling $235,148.35.
6. Employee Reclassification
Recommendation:
Approve the reclassification of one Account Clerk, Senior to the existing classification of
Administrative Secretary.
7. Vernon Public Utilities 2025 Wildfire Mitigation Plan
Recommendation:
A. Find that the proposed action is exempt from the California Environmental Quality Act
(CEQA), in accordance with CEQA Guidelines Section 15061(b)(3), the general rule that
CEQA only applies to projects that may have a significant effect on the environment. This
action receives and files an update to the city’s plan for the implementation of preventative
strategies and mitigation measures to minimize the risk of wildfires caused by electrical lines
and equipment; this action does not authorize any construction activity or any disturbance of
an environmental resource, and has no potential for causing a significant effect on the
environment; and
B. Approve the Vernon Public Utilities 2025 Wildfire Mitigation Plan.
8. Services Agreement with Nalco Company LLC
Recommendation:
A. Approve and authorize the City Administrator to execute a Service Agreement with Nalco
Company LLC, in substantially the same form as submitted, to provide chemical water
treatment services for a total amount not to exceed $913,408.80, for a three-year term; and
B. Authorize a contingency amount of fifteen percent (15%) or $137,011.32 in the event of any
price adjustments or other market factors, and grant authority to the City Administrator to
approve and execute amendments up to the contingency amount, if necessary.
Regular City Council Meeting Agenda July 1, 2025
Page 3 of 5
NEW BUSINESS
9. Commission and Committee Appointments
Recommendation:
A. Appoint two (2) Vernon Area Representatives and one (1) Council Member Representative
to full four-year terms (July 1, 2025 to June 30, 2029) to the Vernon CommUNITY Fund Grant
Committee;
B. Appoint one (1) Business Representative, one (1) Resident Representative (non-City
Council Member), and one (1) Resident Representative (City Council Member) to full four-year
terms (July 1, 2025 to June 30, 2029) to the Vernon Housing Commission;
C. Appoint one (1) Vernon Business Representative to a partial term (July 1, 2025 to June 30,
2026) to the Green Vernon Commission; and
D. Direct the City Clerk to continue recruitment efforts until all Commission and Committee
vacant seats are filled.
10. Donation to the Coalition for Human Immigrant Rights (CHIRLA) to Support Immigrant
Vernon Residents and Workers
Recommendation:
Approve and authorize a donation in the amount of $25,000 to CHIRLA, a non-profit
organization that will provide Vernon residents and workers access to legal support services
and education, and relief programs that address food insecurity, healthcare, and financial
burden (among other things) to mitigate the impacts of recent federal immigration enforcement
action in the City.
ORAL REPORTS
11. City Administrator Reports on Activities and Other Announcements
12. Council Reports on Activities (including AB 1234), Announcements, or Directives to
Staff
CLOSED SESSION
13. Conference with Labor Negotiators
Government Code Section 54957.6
Agency Designated Representative: Brian Saeki, City Administrator
Employee Organizations:
Teamsters Local 911,
IBEW Local 47,
Vernon Police Management Association, and
Vernon Police Officers’ Benefit Association
Unrepresented Employees:
Confidential, Temporary, Unclassified, Mid-Management, Management, and Executive
classifications
Regular City Council Meeting Agenda July 1, 2025
Page 4 of 5
14. Conference with Legal Counsel – Anticipated Litigation
Initiation of Litigation
Government Code Section 54956.9(d)(4)
Number of potential cases: 1
CLOSED SESSION REPORT
ADJOURNMENT
On June 26, 2025, the foregoing agenda was posted in accordance with the applicable legal
requirements. Regular and Adjourned Regular meeting agendas may be amended up to 72 hours
and Special meeting agendas may be amended up to 24 hours in advance of the meeting.
Regular City Council Meeting Agenda July 1, 2025
Page 5 of 5
Guide to City Council Proceedings
Meetings of the City Council are held the first and third Tuesday of each month at 9:00 a.m. and are
conducted in accordance with Rosenberg's Rules of Order (Vernon Municipal Code Section 2.04.020).
Copies of all agenda items and back-up materials are available for review in the City Clerk
Department, Vernon City Hall, 4305 Santa Fe Avenue, Vernon, California, and are available for public
inspection during regular business hours, Monday through Thursday, 7:00 a.m. to 5:30 p.m. Agenda
reports may be reviewed on the City's website at www.cityofvernon.org or copies may be purchased
for $0.10 per page.
Disability-related services are available to enable persons with a disability to participate in this
meeting, consistent with the Americans with Disabilities Act (ADA). In compliance with ADA, if you
need special assistance, please contact the City Clerk department at CityClerk@cityofvernon.org or
(323) 583-8811 at least 48 hours prior to the meeting to assure arrangements can be made.
The Public Comment portion of the agenda is for members of the public to present items, which are
not listed on the agenda but are within the subject matter jurisdiction of the City Council. The City
Council cannot take action on any item that is not on the agenda but matters raised under Public
Comment may be referred to staff or scheduled on a future agenda. Comments are limited to three
minutes per speaker unless a different time limit is announced. Speaker slips are available at the
entrance to the Council Chamber.
Public Hearings are legally noticed hearings. For hearings involving zoning matters, the applicant
and appellant will be given 15 minutes to present their position to the City Council. Time may be set
aside for rebuttal. All other testimony shall follow the rules as set for under Public Comment. If you
challenge any City action in court, you may be limited to raising only those issues you or someone
else raised during the public hearing, or in written correspondence delivered to the City Clerk at or
prior to the public hearing.
Consent Calendar items may be approved by a single motion. If a Council Member or the public
wishes to discuss an item, it may be removed from the calendar for individual consideration. Council
Members may indicate a negative or abstaining vote on any individual item by so declaring prior to
the vote on the motion to adopt the Consent Calendar. Items excluded from the Consent Calendar will
be taken up following action on the Consent Calendar. Public speakers shall follow the guidelines as
set forth under Public Comment.
New Business items are matters appearing before the Council for the first time for formal action.
Those wishing to address the Council on New Business items shall follow the guidelines for Public
Comment.
Closed Session allows the Council to discuss specific matters pursuant to the Brown Act,
Government Code Section 54956.9. Based on the advice of the City Attorney, discussion of these
matters in open session would prejudice the position of the City. Following Closed Session, the City
Attorney will provide an oral report on any reportable matters discussed and actions taken. At the
conclusion of Closed Session, the Council may continue any item listed on the Closed Session agenda
to the Open Session agenda for discussion or to take formal action as it deems appropriate.
1
0
4
9
City Council Agenda Report
Meeting Date:July 1, 2025
From:Genoveva Rocha, City Clerk
Department:City Clerk
Submitted by:Sandra Dolson, City Clerk Specialist
Subject
Recognition of Outgoing City Commission and Committee Members
Recommendation
Present Certificates of Recognition to outgoing Green Vernon Commission and Vernon
CommUNITY Fund Grant Committee Member Clara Gazcon, Vernon CommUNITY Fund Grant
Committee Member Michelle Ybarra, and Vernon Housing Commission Members Juliet Goff and
Steven Froberg.
Background
The City has several Boards, Commissions, and Committee, established by Charter, ordinance,
or resolution, that advise the Council on policy matters or review specific issues and carry out
assignments as requested by the City Council, or prescribed by law.
The following Commission and Committee Members have provided invaluable service to the City:
•Clara Gazcon, Green Vernon Commission and Vernon CommUNITY Fund Grant
Committee – June 7, 2022 to May 2, 2025
•Michelle Ybarra, Vernon CommUNITY Fund Grant Committee – July 20, 2021 to June
30, 2025
•Juliet Goff, Vernon Housing Commission – July 20, 2021 to June 30, 2025
•Steven Froberg, Vernon Housing Commission – June 20, 2017 to June 30, 2025
Staff recommends that the City Council present a Certificate of Recognition to each outgoing
commission and committee member for their service to the City.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
None.
.
.
Item 1 Page 1 of 1
City Council Agenda Report
Meeting Date:July 1, 2025
From:Genoveva Rocha, City Clerk
Department:City Clerk
Submitted by:Sandra Dolson, City Clerk Specialist
Subject
Meeting Minutes
Recommendation
Approve the June 17, 2025 Regular City Council Meeting Minutes.
Background
Staff has prepared and submits the minutes for approval.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. June 17, 2025 Regular City Council Meeting Minutes
.
.
Item 2 Page 1 of 1
MINUTES
VERNON CITY COUNCIL
REGULAR MEETING
TUESDAY, JUNE 17, 2025
COUNCIL CHAMBER, 4305 SANTA FE AVENUE
CALL TO ORDER
Mayor Merlo called the meeting to order at 9:10 a.m.
FLAG SALUTE
Mayor Merlo led the Pledge of Allegiance.
ROLL CALL
PRESENT:
Judith Merlo, Mayor
Melissa Ybarra, Mayor Pro Tem
Leticia Lopez, Council Member
Jesus Rivera, Council Member
Crystal Larios, Council Member
STAFF PRESENT:
Brian Saeki, City Administrator
Angela Kimmey, Deputy City Administrator
Zaynah Moussa, City Attorney
Genoveva Rocha, City Clerk
Alice Hui, Finance Director/City Treasurer
Fredrick Agyin, Health and Environmental Control Director
Lisette M. Grizzelle, Interim Human Resources Director
Robert Sousa, Police Chief
Dan Wall, Public Works Director
Todd Dusenberry, Public Utilities General Manager
APPROVAL OF THE AGENDA
MOTION
Mayor Pro Tem Ybarra moved and Council Member Larios seconded a motion to
approve the agenda. The question was called and the motion carried unanimously.
PUBLIC COMMENT
Aisha Reyes of South Coast Air Quality Management District invited the public to
trade in old gas-powered equipment for battery operated equipment at the 2025
Electric Lawn and Garden Exchange on Saturday, June 28, at Riverside City
College.
.
.
Item 2 Page 1 of 7
Regular City Council Meeting Minutes Page 2 of 7
June 17, 2025
PRESENTATIONS
1. Designation of the Mayor and Mayor Pro Tempore
City Clerk Rocha presented the staff report.
MOTION
Council Member Rivera moved and Mayor Merlo seconded a motion to conduct
City Council Reorganization and Designation of Mayor and Mayor Pro Tempore
following the Certification of the April 8, 2025, General Municipal Election (GME)
Results and Filing Submission to the California Secretary of State. The question
was called and the motion carried unanimously.
The City Council reorganized with Council Member Leticia Lopez assuming the
position of Mayor and Mayor Pro Tem Melissa Ybarra continuing as the Mayor Pro
Tem. Mayor Lopez took control and officiated the meeting
Mayor Lopez expressed gratitude and appreciation to Council Member Merlo for
her leadership, commitment to the community, and service as Mayor.
RECESS
Mayor Lopez recessed the Meeting at 9:15 a.m. to allow the City Clerk to
reorganize the dais. The meeting was reconvened at 9:19 a.m. with all City Council
Members present.
2. Employee Service Pin Awards
Interim Human Resources Director Grizzelle presented the staff report and
informed the City Council that the employees receiving awards were not in
attendance and would be provided with their service pins at a later date.
The City Council recognized the May 2025 Employee Service Pin Award
recipients: Buyer, Marisela Martinez; 25 years of service, Street Maintenance
Worker, Jose L. Zermeno; 20 years of service, and Police Officer, Carlos A.
Saldana, 5 years of service.
CONSENT CALENDAR
MOTION
Mayor Pro Tem Ybarra moved and Council Member Merlo seconded a motion to
approve the Consent Calendar. The question was called and the motion carried
unanimously.
The Consent Calendar consisted of the following items:
.
.
Item 2 Page 2 of 7
Regular City Council Meeting Minutes Page 3 of 7
June 17, 2025
3. Meeting Minutes
Recommendation: Approve the June 3, 2025, Regular City Council Meeting
Minutes.
4. Claims Against the City
Recommendation: Receive and file the claims submitted on behalf of Bedelid
Guerrero by Barbara Gossom, Agent for United Heartland aka SubroIQ, and
Andrea Gomez.
5. Operating Account Warrant Register
Recommendation: Approve Operating Account Warrant Register No. 152, for the
period of May 4, 2025 through May 17, 2025, totaling $9,114,448.66 and consisting
of ratification of electronic payments totaling $8,717,957.17 and ratification of the
issuance of early checks totaling $396,491.49.
6. Fire Department Activity Report
Recommendation: Receive and file the April 2025 Fire Department Activity Report.
7. Police Department Activity Report
Recommendation: Receive and file the April 2025 Police Department Activity
Report.
8. Public Works Department Monthly Report
Recommendation: Receive and file the April 2025 Building Report.
9. Annual Statement of Investment Policy for Fiscal Year 2025-2026
Recommendation: Adopt Resolution No. 2025-019 approving an Annual Statement
of Investment Policy for Fiscal Year 2025-26 and delegating investment authority
to the Director of Finance/City Treasurer.
10. Property and Casualty Insurance Placements for Fiscal Year 2025-26
Recommendation: Approve and authorize the City Administrator to execute all
related documents to procure the City’s annual insurance coverage for Fiscal Year
2025-26, effective July 1, 2025, through June 30, 2026, for a total amount not-to-
exceed $5,662,462.
11. Purchase/Installation of Emergency Equipment for New Patrol Tesla
Vehicle
Recommendation: A. Approve and authorize issuance of a purchase order with
Unplugged Performance for the purchase and installation of an emergency
equipment package in a new Tesla patrol vehicle for a total amount not-to-exceed
$64,926; and
B. Authorize a contingency amount of ten (10%) percent or $6,492.60, for pricing
fluctuations and grant authority to the City Administrator to issue a Change Order
for an amount up to the contingency amount, if necessary.
12. Blanket Purchase Order with The Home Depot
Recommendation: Approve the issuance of a blanket Purchase Order with The
Home Depot in an amount not-to-exceed $190,000 to procure supplies for the
Public Works Department and Vernon Public Utilities for operational needs and
special projects for Fiscal Year (FY) 2025-2026.
13. Revocable Encroachment License Agreement No. 442 with Vernon
Environmental Response Corporation, not individually but in its capacity as
Trustee of the Exide Vernon Environmental Response Trust
.
.
Item 2 Page 3 of 7
Regular City Council Meeting Minutes Page 4 of 7
June 17, 2025
Recommendation: A. Find that approval of the proposed action is categorically
exempt under the California Environmental Quality Act (CEQA), in accordance with
CEQA guidelines 15061(b)(3), the general rule that CEQA only applies to projects
which have the potential for causing a significant effect on the environment; and
B. Approve and authorize the Mayor to execute the Revocable Encroachment
License Agreement No. 442 (Agreement) between the City of Vernon and the
Vernon Environmental Response Corporation (VERC), not individually but in its
capacity as Trustee of the Exide Vernon Environmental Response Trust (VERT).
14. Services Agreement with Hill Brothers Chemical Company
Recommendation: A. Approve and authorize the City Administrator to execute a
Services Agreement with Hill Brothers Chemical Company, in substantially the
same form as submitted, for the supply of 19% aqueous ammonia for a total
amount not to exceed $179,010 for a three-year term; and B. Authorize a
contingency amount of ten percent (10%) or $17,901 in the event of unforeseen
expenses, including price volatility, and grant authority to the City Administrator to
approve and execute amendments up to the contingency amount, if necessary.
NEW BUSINESS
15. Metro Link Union Station (Link US) Project Update
Mayor Pro Tem Ybarra announced a conflict of interest, stating ownership of
property within 500 feet of proposed mitigation measures to the proposed project,
recused from council discussion and deliberation on the item, and excused herself
from the dais.
Council Member Larios announced she was recusing from council discussion and
deliberation on the item due to her employment with LA Metro out of an abundance
of caution and excused herself from the Council Chamber until the discussion on
the item concluded.
LA Metro Link US Project Team provided a PowerPoint presentation.
Mayor Lopez called for questions from City Council and invited Public Comment.
Danielle Valentino of LA Metro stated LA Metro staff were available to answer
questions on the project.
Michael Melideo of Consolidated Fabricators spoke about negative staging and
environmental impacts along Santa Fe, and his opposition to the project.
Peter Melideo of Consolidated Fabricators spoke about negative logistical and
safety concerns, and his opposition to the project.
.
.
Item 2 Page 4 of 7
Regular City Council Meeting Minutes Page 5 of 7
June 17, 2025
Greg Gurewitz of Great American Packaging spoke about possible train
derailments, negative noise, vibrations to his equipment and traffic, and his
opposition to the project.
Tim Tel esio of Dot-Line Transportation spoke about the negative impacts to the
flow of traffic on 26th Street, eminent domain, and his opposition to the project.
Marisa Olguin of Vernon Area Chamber of Commerce spoke about the need for
further review on the eastside impacts, tripling amount of train trips, and her
opposition to the project.
Parker Renick of NAI Capital spoke about the proposed cosmetic improvements,
increased congestion and movement barriers, and his opposition to the project.
Brian Baily of Pabco Paper spoke about how no one from LA Metro had met with
him, the negative existing and probable increase of soot build-up from trains on his
property that employees must inhale, and his opposition to the project.
Felipe Rodriguez of Coast Packing spoke about the negative impacts of trains
blocking crossings on Soto will spill over onto other streets, and his opposition to
the project.
Dennis Berman of Deleni Boys, LLC and Bandwagon spoke about the negative
impacts on employees traveling to and from work, impacts on truck distributors
unwilling to take trips into Vernon, and his opposition to the project.
City Clerk Rocha announced written correspondence had been submitted for
Public Comment from Saul Ewing, representing a Vernon business owner located
at 4900 S. Santa Fe Avenue, expressing their opposition to the project.
Thomas Condon of Colliers spoke about negative impacts to industry, and his
opposition to the project.
The LA Metro Project Team addressed questions raised by the public related to
train and track length, the 26th Street crossing, and clarified eminent domain did
not apply to this project.
In response to questions from the City Council, the LA Metro team assured
business owners who provided public comment would be contacted as the
environmental impact review period is ongoing.
Mayor Lopez called for additional public comments or questions for Staff or LA
Metro. There being no other speakers, Mayor Lopez called for a motion.
.
.
Item 2 Page 5 of 7
Regular City Council Meeting Minutes Page 6 of 7
June 17, 2025
MOTION
Council Member Rivera moved and Council Member Merlo seconded a motion to
receive and file the Metro Link US Project Update. The question was called and
the motion carried 3-0, Council Member Larios and Mayor Pro Tem Ybarra
recusing.
Mayor Pro Tem Ybarra and Council Member Larios rejoined the meeting at the
dais.
ORAL REPORT
16. City Administrator Reports on Activities and Other Announcements
City Administrator Saeki provided an update on immigration enforcement activity
in neighboring communities, announced upcoming city events including a reminder
of the Vernon Brand Celebration and power plant tour, the Vernon Reads!
Giveaway Event where City Council will distribute e-readers to Vernon kids and
facilitate sign-ups for subscriptions to Vernon residents, expressed thanks to
Council Member Merlo for her time served as Mayor and congratulated Council
Member Lopez on her appointment as Mayor.
17. Council Reports on Activities (including AB 1234), Announcements, or
Directives to Staff
None.
RECESS
At 10:31 a.m., Mayor Lopez recessed the meeting to Closed Session.
CLOSED SESSION
Council Member Merlo left the meeting at 10:31 a.m.
18. Conference with Labor Negotiators
Government Code Section 54957.6
Agency Designated Representative: Brian Saeki, City Administrator
Employee Organizations:
Teamsters Local 911,
IBEW Local 47,
Vernon Police Management Association, and
Vernon Police Officers’ Benefit Association
Unrepresented Employees:
.
.
Item 2 Page 6 of 7
Regular City Council Meeting Minutes Page 7 of 7
June 17, 2025
Confidential, Temporary, Unclassified, Mid- Management, Management, and
Executive classifications
19. Conference with Legal Counsel – Anticipated Litigation
Initiation of Litigation
Government Code Section 54956.9(d)(4)
Number of potential cases: 1
RECONVENE
At 11 :04 a.m., Mayor Lopez adjourned the Closed Session and reconvened the
regular meeting with Council Members Larios and Merlo absent.
Council Member Larios left the meeting at 11:03 a.m.
CLOSED SESSION REPORT
City Attorney Moussa reported that the City Council received an update and
provided direction to staff on Item 18. Due to recusals and lack of quorum, the City
Council did not consider Item 19.
ADJOURNMENT
Mayor Lopez adjourned the meeting at 11:0 4 a.m.
_____________________________
LETICIA LOPEZ, Mayor
ATTEST:
______________________________
GENOVEVA ROCHA, City Clerk
.
.
Item 2 Page 7 of 7
City Council Agenda Report
Meeting Date:July 1, 2025
From:Genoveva Rocha, City Clerk
Department:City Clerk
Submitted by:Yonnie Parker, Deputy City Clerk
Subject
Claims Against the City
Recommendation
Receive and file the claim submitted by Americo Blanco.
Background
The City received the following claim and pursuant to Municipal Code Section 2.32.040, the claim
is being presented to the City Council as soon after filing of the claim with the City as practical.
Name of Claimant Amount Demanded Date Received
Americo Blanco $500 June 9, 2025
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Americo Blanco Claim
.
.
Item 3 Page 1 of 1
.
.
Item 3 Page 1 of 11
.
.
Item 3 Page 2 of 11
.
.
Item 3 Page 3 of 11
.
.
Item 3 Page 4 of 11
.
.
Item 3 Page 5 of 11
.
.
Item 3 Page 6 of 11
.
.
Item 3 Page 7 of 11
.
.
Item 3 Page 8 of 11
.
.
Item 3 Page 9 of 11
.
.
Item 3 Page 10 of 11
.
.
Item 3 Page 11 of 11
6
3
0
City Council Agenda Report
Meeting Date:July 1, 2025
From:Genoveva Rocha, City Clerk
Department:City Clerk
Submitted by:Sandra Dolson, City Clerk Specialist
Subject
City Council Appointments to Outside Agencies
Recommendation
Affirm or modify appointments of representatives and/or alternates to various outside agencies.
Background
With the April 8, 2025 General Municipal Election and City Council reorganization on June 17,
2025, the Council has the opportunity to review appointments to outside agencies (attachment
1). Appointees serve as voting members and some positions receive a stipend.
City staff is also seeking Council appointment for a voting delegate and an alternate to represent
the City of Vernon at the General Assembly during the League of California Cities (CalCities)
2025 Annual Conference and Expo in October, and the 2026 Southern California Association of
Governments Regional Conference and General Assembly, which will be held in May.
The following table lists the current appointments and names those who have expressed interest
in continuing to serve or being appointed to a new agency:
Board/Agency Current Delegate/
Alternate
Expressed
Interest
California Contract Cities Association Larios/
Rivera
Larios/
Rivera
Central Basin Water Association
Merlo/
Larios/
VPU Rep
Merlo/
Larios/
VPU Rep
City Selection Committee (Mayor)Lopez/
Entire Council
N/A
Entire Council
County Sanitation District No. 1 (Mayor)
(Alternate is typically Mayor Pro-Tem)
Lopez/
Ybarra
N/A
Ybarra
County Sanitation District No. 2 (Mayor)
(Alternate is typically Mayor Pro-Tem)
Lopez/
Ybarra
N/A
Ybarra
County Sanitation District No. 23 Entire Council Entire Council
Gateway Cities Council of Governments Larios/
Lopez
Larios/
Lopez
Greater Los Angeles County Vector Control District
Health and Safety Code Section 2024
Ybarra
(term ends 1/5/27)Ybarra
Independent Cities Finance Authority Lopez/
Merlo
Lopez/
Merlo.
.
Item 4 Page 1 of 4
6
3
0
Board/Agency Current Delegate/
Alternate
Expressed
Interest
League of California Cities Merlo/
Lopez
Merlo/
Lopez
Southern California Association of Governments Rivera Rivera
Southeast Community Development Corporation Ybarra Ybarra
Southeast Water Coalition Ybarra/
Rivera
Ybarra/
Rivera
Vernon Solid Waste Hearing Panel
(up to 3 Council Members)
Lopez/
Ybarra/
Larios
Lopez/
Ybarra/
Larios/
California Contract Cities Association (CCCA) meets on the 3rd Wednesday monthly. The
Association develops and fosters public and private partnerships between member cities and the
business community to provide mutually beneficial resources and services; and create revenue
opportunities, long-term relationships, and forums to better serve the goals and priorities of the
CCCA and its Associate Members. Council Member Larios is the current representative, and
Council Member Rivera serves as the alternate representative.
Central Basin Water Association meets quarterly upon notice. The Association is composed
of water rights holders in the West Coast Basin, including municipalities and private owners. This
association provides a forum for members to discuss current water rights issues and policies.
Representatives receive a stipend, and an appointment requires filing a Statement of Economic
Interest Form 700. Council Member Merlo is the current representative, and Council Member
Larios serves as the alternate representative. The General Manager of Vernon Public Utilities
(VPU), or their designee, also serves as an alternate.
City Selection Committee (Mayor) meets as needed. The representative is the Mayor, and all
Council Members serve as alternates. The duties of members are to appoint City representatives
to such Boards, Commissions, and Agencies (i.e. LAFCO, South Coast Air Quality Management
District, Los Angeles County Metropolitan Transportation Authority, Los Angeles County
Hazardous Waste Management Advisory Committee; and to nominate for appointment Members
to the California Coastal Commission).
Los Angeles County Sanitation Districts have a mission to protect public health and the
environment through innovative and cost-effective wastewater and solid waste management, and
in doing so convert waste into resources such as recycled water, energy, and recycled materials.
Vernon representatives serve in Districts No. 1, 2, and 23. Representatives receive a stipend,
and an appointment to the Sanitation District requires filing a Statement of Economic Interest
Form 700.
•County Sanitation District No. 1 meets on the 2nd Wednesday monthly. The Mayor
serves as the representative. An alternate representative may be appointed by the City
Council. Mayor Pro Tem Ybarra is the current alternate representative.
.
.
Item 4 Page 2 of 4
6
3
0
•County Sanitation District No. 2 meets on the 2nd and 4th Wednesday monthly. The
Mayor serves as the representative. An alternate representative may be appointed by
the City Council. Mayor Pro Tem Ybarra is the current alternate representative.
•County Sanitation District No. 23 meets on the 2nd Wednesday monthly. All Council
Members serve as representatives.
Gateway Cities Council of Governments meets every month on the 1st Wednesday to improve
the quality of life for the residents of Southeast Los Angeles County. Targeted Initiatives include
transportation planning, affordable housing, improving air quality, economic development, and
other community-enhancing activities. Representatives receive a stipend, and an appointment to
the Council of Governments requires filing a Statement of Economic Interest Form 700. Council
Member Larios is the current representative, and Mayor Lopez serves as the alternate
representative.
Greater Los Angeles County Vector Control District Board of Trustees meets monthly on
the 2nd Thursday. Its mission is to reduce populations of public health vectors below nuisance
levels, prevent human infection associated with mosquito-transmitted diseases, and prevent the
loss of property values and commercial enterprise as the result of vector occurrence and activity.
The representative receives a stipend, and an appointment to the board requires filing a
Statement of Economic Interest Form 700. Pursuant to the California Health and Safety Code
Section 2024, representatives are appointed effective the first Monday in January for two or four-
year terms. The district does not recognize the appointment of alternate representatives. Mayor
Pro Tem Ybarra is the current representative.
Independent Cities Finance Authority conducts its annual meeting on the 1st Wednesday in
June and conducts special meetings as necessary. The Joint Powers Agreement created the
Independent Cities Finance Authority permitting two or more public agencies to collaborate to
assist public agencies in financing the acquisition, construction, installation, and/or equipping of
public capital improvements and to encourage and promote other joint and cooperative
endeavors among such public agencies for their mutual benefit. Representatives receive a
stipend, and an appointment to the finance authority requires filing a Statement of Economic
Interest Form 700. Mayor Lopez is the current representative, and Council Member Merlo is the
alternate representative.
The League of California Cities conducts its Annual Conference and Expo in October.
Delegates and alternates represent the City of Vernon at the General Assembly. The League of
California Cities assists its members by defending and expanding local control through advocacy
efforts. Council Member Merlo is the current representative, and Mayor Lopez serves as the
alternate representative.
Southern California Association of Governments (SCAG) conducts its annual General
Assembly meeting in April/May. SCAG is the nation’s largest metropolitan planning organization,
undertaking a variety of planning and policy initiatives to encourage a more sustainable Southern
California presently and in the future. Council Member Rivera is the current representative.
Southeast Community Development Corporation (SCDC) is not a City appointment and is
only listed to show comprehensive outside agency appointments. The mission of SCDC is to
promote community health, education, and safety, provide economic development, and to
improve the standard of living for residents of Southeast Los Angeles County. Mayor Pro Tem
Ybarra serves on the SCDC Board.
.
.
Item 4 Page 3 of 4
6
3
0
Southeast Water Coalition (SEWC) meets on the 1st Thursday of even-numbered months. The
Coalition was formed to improve and protect the quantity and quality of the regional water supply.
SEWC’s mission is to prevent the contamination of the Central Groundwater Basin from migrating
contaminated groundwater and to encourage good governance of water policies to ensure the
availability of reliable, quality, and affordable water. The Board of Directors consists of one
representative (normally a Council Member) from each member city. Representatives receive a
stipend, and an appointment to the coalition requires filing a Statement of Economic Interest
Form 700. Mayor Pro Tem Ybarra is the current representative, and Council Member Rivera
serves as the alternate representative.
Vernon Solid Waste Hearing Panel meets as needed. Pursuant to the Public Resources Code
Section 44308, three Council Members may be appointed. The Vernon Health and
Environmental Control Department serves as the Local Enforcement Agency for Solid Waste
Facilities in the City of Vernon. The hearing panel is available to convene and provide resolutions
to solid waste related issues and conflicts that may arise from within the Local Enforcement
Agency’s purview. Mayor Lopez, Mayor Pro Tem Ybarra, and Council Member Larios are the
current representatives.
The City Clerk Department will notify the outside agencies of the appointments and assist the
Council with its filing obligations. Additionally, according to the Fair Political Practices
Commission (FPPC) regulation 18702.5, FPPC Form 806 will be properly posted.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Outside Agency Appointments
.
.
Item 4 Page 4 of 4
COUNCIL OUTSIDE AGENCY APPOINTMENTS
Outside Agency Appointments Page 1 of 1
California Contract Cities Association Larios Rivera 5/21/24 5/21/24 3rd Wednesday monthly, 6 p.m. (dark Jan., July and Sept.)
Location varies for each meeting.
None
Central Basin Water Association Merlo Larios VPU Rep
5/21/24 5/21/24 Quarterly, will provide notice of meetings
Rio Hondo Event Center, 10627 Old River School Road
Downey, CA 90241
Form 700
City Selection Committee (Mayor) Lopez Council 6/17/25 Meets as needed. Kenneth Hahn Hall of Administration,
500 Temple St., Los Angeles, CA 90012
None
County Sanitation District #1 (Mayor) Lopez Ybarra 6/17/25 6/17/25 2nd Wednesday monthly, 1:30 p.m. at Joint Administration
Office, 1955 Workman Mill, Whittier, 90601 or Vernon City
Hall
$125 Form 700
County Sanitation District #2 (Mayor) Lopez Ybarra 6/17/25 6/17/25 2nd & 4th Wednesday monthly, 1:30 p.m. at Joint
Administration Office, 1955 Workman Mill, Whittier, 90601
or Vernon City Hall and Paramount City Hall
$175 1st meeting
$125
subsequent
meetings
Form 700 County Sanitation District #23 Entire Council Upon Council Appointment 2nd Wednesday monthly, 1:30 p.m at Joint Administration
Office, 1955 Workman Mill, Whittier, 90601 or Vernon City
Hall
$125 Form 700
Gateway Cities Council of Governments Larios Lopez 5/21/24 5/21/24 1st Wednesday monthly, 6:00 p.m.
16401 Paramount Blvd, Paramount 90723 $125
Form 700 Greater Los Angeles County Vector Control District
Health and Safety Code Section 2024
Ybarra 1/6/25 to 1/5/27 2nd Thursday of each month, 7 p.m.@ headquarters 12545
Florence Ave., Santa Fe Springs 90670
$100
Form 700
Independent Cities Finance Authority Lopez Merlo 5/21/24 5/21/24 Annual meeting 1st Wednesday in June, 12 p.m. and
special meetings as necessary at Vernon City Hall
$150
Form 700 League of California Cities Merlo Lopez 9/17/24 9/17/24 Annual Conference and Expo – General Assembly in
October
None
Southern California Association of Governments Rivera 1/21/25 Appointment should be made prior to Annual General
Assembly meeting in April or May.
Form 700
Following annual
conference
Southeast Community Development Corporation Ybarra N/A This is not a City appointment but listed to show
comprehensive outside agency appointments.
None
Southeast Water Coalition Ybarra Rivera 5/21/24 5/21/24 1st Thursday of even numbered months, 6:30 p.m.,
Norwalk Arts & Sports Complex, Sproul Room
13000 Clarkdale Avenue, Norwalk, CA 9065
$150
Form 700
Vernon Solid Waste Hearing Panel – Up to 3 Councilmembers
Public Resources Code Section 44308
Larios Ybarra Lopez
1/21/25 5/21/24 5/21/24
Meet as needed. Local Enforcement Agency for Solid
Waste Facilities – Hearing Panel
Vernon City Hall
Waste Permitting, Compliance & Mitigation Division - LEA
None
.
.
Item 4 Page 1 of 1
City Council Agenda Report
Meeting Date:July 1, 2025
From:Alice Hui, Director of Finance
Department:Finance
Submitted by:Kathryne Magana, Accountant
Subject
Operating Account Warrant Register
Recommendation
Approve Operating Account Warrant Register No. 153, for the period of May 18, 2025, through
May 31, 2025, totaling $8,248,897.44 and consisting of ratification of electronic payments totaling
$8,013,749.09 and ratification of the issuance of early checks totaling $235,148.35.
Background
Vernon Municipal Code Section 2.32.060 indicates the City Treasurer, or an authorized
designee, shall prepare warrants covering claims or demands against the City which are to be
presented to City Council for its audit and approval. Pursuant to the aforementioned code section,
the City Treasurer has prepared Operating Account Warrant Register No. 153 covering claims
and demands presented during the period of May 18, 2025, through May 31, 2025, drawn, or to
be drawn, from East West Bank for City Council approval.
Fiscal Impact
The fiscal impact of approving Operating Account Warrant Register No. 153, totals
$8,248,897.44. The Finance Department has determined that sufficient funds to pay such
claims/demands, are available in the respective accounts referenced on Operating Account
Warrant Register No. 153.
Attachments
1. Operating Account Warrant Register No. 153
.
.
Item 5 Page 1 of 1
STAFF REPORT
FINANCE DEPARTMENT
DATE: June 17, 2025
TO: Honorable Mayor and City Council
FROM: Alice Hui, City Treasurer
RE: Operating Account Warrant Register for City Council Agenda of July 1, 2025
It is recommended that the attached Operating Account Warrant Register No. 153 be approved at the City Council meeting of July 1, 2025.
Operating Account Warrant Register No. 153 totals $8,248,897.44, and covers claims and demands presented for May 18, 2025, to May
31, 2025, drawn or to be drawn, from East West Bank.
The following list details the components of Operating Account Warrant Register No. 153:
1. Ratification of electronic payments totaling $8,013,749.09
2. Ratification of the issuance of early checks totaling $235,148.35
.
.
Item 5 Page 1 of 44
OPERATING ACCOUNT WARRANT REGISTER
City of Vernon
No.153
I hereby Certify: that claims or demands covered by the This is to certify that the claims or demands
above listed warrants have been audited as to accuracy covered by the above listed warrants have been
and availability of funds for payments thereof; and that audited by the City Council of the City of Vernon
said claims or demands are accurate and that funds are and that all of said warrants are approved for pay-
available for payments thereof.ments except Warrant Numbers:
Alice Hui DATE
City Treasurer
DATE
Date:
Page 1 of 1 Operating Account Warrant Register Cover - 153 : Warrant
6/17/25
.
.
Item 5 Page 2 of 44
235,148.35
5/22/2025 31.75
Invoice Description Account PO or Contract Line Item Amount
23434448 ACCT 9391054023 PERIOD 4/6/25-5/5/25 011-010-110-526010 20230186 31.75
Invoice Total: 31.75
5/22/2025 2,123.90
Invoice Description Account PO or Contract Line Item Amount
8600570019 ACCT 831-000-0922 427 PERIOD 3/19-4/18/25 011-010-110-526010 20230186 152.00
Invoice Total: 152.00
8944561013 ACCT 831-000-9006 723 PERIOD 3/19-4/18/25 011-010-110-526010 20230186 1,971.90
Invoice Total: 1,971.90
5/22/2025 43,973.78
Invoice Description Account PO or Contract Line Item Amount
040825 SUBSCRIPTION- 911 CPE TURNKEY STAND-
ALONE SYSTEM
011-010-110-529110 250440 23,291.98
040825 SUBSCRIPTION- 911 CPE TURNKEY STAND-
ALONE SYSTEM
011-010-110-529110 250440 15,737.09
040825 SUBSCRIPTION- 911 CPE TURNKEY STAND-
ALONE SYSTEM
011-010-110-529110 250440 4,944.71
Invoice Total: 43,973.78
5/22/2025 38,325.58
Invoice Description Account PO or Contract Line Item Amount
339415 LEGAL SERVICES 011-010-115-529200 LD-0044-1 13,806.12
Invoice Total: 13,806.12
341102 LEGAL SERVICES 011-010-115-529200 LD-0044-1 7,188.50
VENDOR - 1948 - AT&T PAYMENT # 614668
VENDOR - 5078 - BURKE, WILLIAMS & SORENSEN, LLP PAYMENT # 614669
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
EARLY CHECKS TOTAL:
VENDOR - 1948 - AT&T PAYMENT # 614666
VENDOR - 1948 - AT&T PAYMENT # 614667
Page 1 of 42
.
.
Item 5 Page 3 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Total: 7,188.50
341104 LEGAL SERVICES 011-010-115-529200 LD-0044-1 11,220.00
Invoice Total: 11,220.00
341105 LEGAL SERVICES 011-010-115-529200 LD-0044-1 323.00
Invoice Total: 323.00
341106 LEGAL SERVICES 011-010-115-529200 LD-0044-1 4,798.46
Invoice Total: 4,798.46
341107 LEGAL SERVICES 011-010-115-529200 LD-0044-1 227.50
Invoice Total: 227.50
341108 LEGAL SERVICES 011-010-115-529200 LD-0044-1 762.00
Invoice Total: 762.00
5/22/2025 1,541.93
Invoice Description Account PO or Contract Line Item Amount
5512 RENEW MEMBERSHIP FEE 011-020-200-529550 1,541.93
Invoice Total: 1,541.93
5/22/2025 3,762.34
Invoice Description Account PO or Contract Line Item Amount
59330 AUTO PARTS 011-040-420-522000 250041 199.35
Invoice Total: 199.35
59474 AUTO PARTS 011-040-420-522000 250041 2,718.83
Invoice Total: 2,718.83
59502 AUTO PARTS 011-040-420-522000 250041 677.19
Invoice Total: 677.19
59531 AUTO PARTS 011-040-420-522000 250041 166.97
Invoice Total: 166.97
5/22/2025 2,150.00
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 8098 - CALIFORNIA CONFERENCE OF
DIRECTORS OF ENVIRONMENTA
PAYMENT # 614670
VENDOR - 4163 - CENTRAL FORD AUTOMOTIVE, INC. PAYMENT # 614671
VENDOR - 7928 - COSTAR REALTY INFORMATIONC, INC. PAYMENT # 614672
Page 2 of 42
.
.
Item 5 Page 4 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
122123096 REAL ESTATE RESEARCH SERVICES
PERIOD MAY 2025
011-010-150-525000 20250161 2,150.00
Invoice Total: 2,150.00
5/22/2025 435.08
Invoice Description Account PO or Contract Line Item Amount
658288 WELDING SUPPLIES 056-060-600-529000 250006 435.08
Invoice Total: 435.08
5/22/2025 561.99
Invoice Description Account PO or Contract Line Item Amount
288311 PARTS & SUPPLIES 058-070-700-529000 250034 561.99
Invoice Total: 561.99
5/22/2025 8,829.25
Invoice Description Account PO or Contract Line Item Amount
24SM5642 FORMER THERMADOR INDUSTRIAL SITE 011-020-200-529225 HD-0035 8,829.25
Invoice Total: 8,829.25
5/22/2025 2,334.00
Invoice Description Account PO or Contract Line Item Amount
VPD25005 BACKGROUND INVESTIGATION SERVICE 011-030-300-529215 20240126 2,334.00
Invoice Total: 2,334.00
5/22/2025 1,320.00
Invoice Description Account PO or Contract Line Item Amount
321042R 3-HOUR ONSITE CPR/AED TRAINING 011-040-415-529670 20250336 1,100.00
321042R 3-HOUR ONSITE CPR/AED TRAINING 011-040-420-529670 20250336 220.00
Invoice Total: 1,320.00
VENDOR - 1336 - CURRENT WHOLESALE ELECTRIC
SUPPLY
PAYMENT # 614674
VENDOR - 620 - DEPT OF TOXIC SUBSTANCES CTRL PAYMENT # 614675
VENDOR - 6567 - DONALD C. LACHER PAYMENT # 614676
VENDOR - 310 - CRAIG WELDING SUPPLY, CO PAYMENT # 614673
VENDOR - 5229 - EHS INTERNATIONAL, INC PAYMENT # 614677
Page 3 of 42
.
.
Item 5 Page 5 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/22/2025 1,426.99
Invoice Description Account PO or Contract Line Item Amount
126580825 GARAGE SUPPLIES 011-040-420-522000 250043 1,426.99
Invoice Total: 1,426.99
5/22/2025 86.00
Invoice Description Account PO or Contract Line Item Amount
051425 LIVESCAN REIMBURSEMENT 011-010-120-529215 86.00
Invoice Total: 86.00
5/22/2025 667.20
Invoice Description Account PO or Contract Line Item Amount
C1AMXS PARTS & SUPPLIES 011-040-420-522000 250508 494.32
C1AMXS PARTS & SUPPLIES 011-040-420-529000 250508 34.60
Invoice Total: 528.92
C1ANNS PARTS & SUPPLIES 011-040-420-522000 250509 122.28
C1ANNS PARTS & SUPPLIES 011-040-420-529000 250509 16.00
Invoice Total: 138.28
5/22/2025 18,825.03
Invoice Description Account PO or Contract Line Item Amount
49816 HVAC SYSTEM MAINTENANCE/REPAIR 011-040-415-529000 20250150 4,684.79
Invoice Total: 4,684.79
49817 HVAC SYSTEM MAINTENANCE/REPAIR 011-040-415-529000 20250150 7,319.89
Invoice Total: 7,319.89
49818 HVAC SYSTEM MAINTENANCE/REPAIR 011-040-415-529000 20250150 6,820.35
Invoice Total: 6,820.35
5/22/2025 200.00
VENDOR - 1346 - HAAKER EQUIPMENT COMPANY PAYMENT # 614680
VENDOR - 7871 - HARBOR POINTE AIR CONDITIONING &
CONTROL SYSTEMS
PAYMENT # 614681
VENDOR - 686 - IGOE & COMPANY INCORPORATED PAYMENT # 614682
VENDOR - 6696 - ELLIOTT AUTO SUPPLY CO, INC PAYMENT # 614678
VENDOR - 8095 - ERICK JIMENEZ PAYMENT # 614679
Page 4 of 42
.
.
Item 5 Page 6 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
352817 FSA ADMINISTRATION 011-010-120-529220 100.00
Invoice Total: 100.00
358198 FSA ADMINISTRATION 011-010-120-529220 100.00
Invoice Total: 100.00
5/22/2025 6,758.94
Invoice Description Account PO or Contract Line Item Amount
2888 COLLISION REPAIR P43 011-040-420-522000 250507 3,616.28
2888 COLLISION REPAIR P43 011-040-420-529000 250507 3,142.66
Invoice Total: 6,758.94
5/22/2025 52.00
Invoice Description Account PO or Contract Line Item Amount
050525 LIVESCAN REIMBURSEMENT 011-010-120-529215 52.00
Invoice Total: 52.00
5/22/2025 300.00
Invoice Description Account PO or Contract Line Item Amount
052125 STRATEGIC PLANNING WORKSHOP 011-030-300-529670 300.00
Invoice Total: 300.00
5/22/2025 2,024.96
Invoice Description Account PO or Contract Line Item Amount
IN4777998 MANAGED PRINT SERVICES PERIOD 3/30-
4/29/25
011-010-110-529110 2,024.96
Invoice Total: 2,024.96
5/22/2025 5,970.66
VENDOR - 6203 - MRC SMART TECHNOLOGY SOLUTIONS PAYMENT # 614686
VENDOR - 6722 - MUNISERVICES, LLC PAYMENT # 614687
VENDOR - 7488 - LA AUTO BODY PAYMENT # 614683
VENDOR - 8100 - LESLIE VEGA PAYMENT # 614684
VENDOR - 138 - LOS ANGELES COUNTY POLICE CHIEFS' PAYMENT # 614685
Page 5 of 42
.
.
Item 5 Page 7 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
INV06020686 UUT AUDITING SERVICES 011-010-130-529225 FI-0043 3,979.53
Invoice Total: 3,979.53
INV06020878 CLEARVIEW/STAR Q4 24 011-010-130-529215 FI-0042 1,991.13
Invoice Total: 1,991.13
5/22/2025 262.10
Invoice Description Account PO or Contract Line Item Amount
272955 AUTO PARTS 011-040-420-522000 250045 35.01
Invoice Total: 35.01
273366 AUTO PARTS 011-040-420-522000 250045 20.27
Invoice Total: 20.27
273603 AUTO PARTS 011-040-420-522000 250045 206.82
Invoice Total: 206.82
5/22/2025 174.00
Invoice Description Account PO or Contract Line Item Amount
86732246 PRE-EMPLOYMENT PHYSICAL 011-010-120-529700 20250151 174.00
Invoice Total: 174.00
5/22/2025 2,791.16
Invoice Description Account PO or Contract Line Item Amount
B25B268 LAB SERVICE 055-050-586-520232- 20250142 2,118.20
Invoice Total: 2,118.20
B25D183 LAB SERVICE 055-050-586-520232- 20250142 672.96
Invoice Total: 672.96
5/22/2025 5,000.00
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 309 - NAPA AUTO PARTS PAYMENT # 614688
VENDOR - 6586 - OCCUPATIONAL HEALTH CENTERS OF CA PAYMENT # 614689
VENDOR - 470 - POSITIVE LAB SERVICE PAYMENT # 614690
VENDOR - 7424 - PRO-WEST & ASSOCIATES, INC PAYMENT # 614691
Page 6 of 42
.
.
Item 5 Page 8 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
INV0000001827 GIS TECHNICAL SUPPORT PERIOD 4/30/25-
4/30/26
011-010-110-529210 20250352 5,000.00
Invoice Total: 5,000.00
5/22/2025 211.25
Invoice Description Account PO or Contract Line Item Amount
253064 CANDIDATE STATEMENT PRINTING COST 011-010-125-529300 211.25
Invoice Total: 211.25
5/22/2025 7,227.44
Invoice Description Account PO or Contract Line Item Amount
R733478US MOTOR VALVE 055-050-560-529000 250451 7,177.44
Invoice Total: 7,177.44
R733480US FREIGHT CHARGE 055-050-560-529000 250451 50.00
Invoice Total: 50.00
5/22/2025 1,952.70
Invoice Description Account PO or Contract Line Item Amount
1074256524 PRE-BOOKING PHYSICAL EXAMINATIONS 011-030-300-529215 20230054 1,952.70
Invoice Total: 1,952.70
5/22/2025 450.00
Invoice Description Account PO or Contract Line Item Amount
050125 HYDRANT ACCT 350.09 011-030-305-526000 225.00
Invoice Total: 225.00
110124 HYDRANT ACCT 350.09 011-030-305-526000 225.00
Invoice Total: 225.00
5/22/2025 2,000.00
VENDOR - 1931 - REGISTRAR-RECORDER/COUNTY CLK PAYMENT # 614692
VENDOR - 8069 - SCHUBERT & SALZER INC PAYMENT # 614693
VENDOR - 380 - STACY MEDICAL CENTER PAYMENT # 614694
VENDOR - 282 - TRI-CITY MUTUAL WATER COMPANY PAYMENT # 614695
VENDOR - 7626 - TRIDEN GROUP CORPORATION PAYMENT # 614696
Page 7 of 42
.
.
Item 5 Page 9 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
28330R TGvCISO 2 YEAR AGREEMENT 011-010-110-529210 20240203 2,000.00
Invoice Total: 2,000.00
5/22/2025 956.88
Invoice Description Account PO or Contract Line Item Amount
49697 BALLISTIC VEST 011-030-300-524000 250462 956.88
Invoice Total: 956.88
5/22/2025 1,459.00
Invoice Description Account PO or Contract Line Item Amount
851881988 CLEAR PROFLEX SOFTWARE 011-010-110-529110 20250024 1,459.00
Invoice Total: 1,459.00
5/22/2025 2,696.39
Invoice Description Account PO or Contract Line Item Amount
I50001203407 BASIN RINSE WATER RECOVERY 055-050-586-520232- 20250307 2,696.39
Invoice Total: 2,696.39
5/22/2025 12,000.00
Invoice Description Account PO or Contract Line Item Amount
1226 LEGISLATIVE AND REGULATORY ADV
PERIOD APR 2025
055-050-580-529215 20240425 12,000.00
Invoice Total: 12,000.00
5/30/2025 4,972.50
Invoice Description Account PO or Contract Line Item Amount
19783510 PANORAMIC DOME IP CAMERAS 011-010-110-522010 250495 4,972.50
Invoice Total: 4,972.50
VENDOR - 141 - WEST PUBLISHING CORPORATION PAYMENT # 614698
VENDOR - 2308 - WORLD OIL ENVIRONMENTAL SERVICES PAYMENT # 614699
VENDOR - 7950 - CALIFORNIA PUBLIC POLICY GROUP, INC. PAYMENT # 614700
VENDOR - 7311 - U.S. ARMOR CORPORATION PAYMENT # 614697
VENDOR - 5460 - 247CCTV, INC PAYMENT # 614701
Page 8 of 42
.
.
Item 5 Page 10 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/30/2025 750.00
Invoice Description Account PO or Contract Line Item Amount
25138IN ON-CALL TRAFFIC ENGINEERING SERVICES-
APR. 2025
011-040-430-529215 20240158 750.00
Invoice Total: 750.00
5/30/2025 1,182.38
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#0948 058-000-000-110010 1,182.38
Invoice Total: 1,182.38
5/30/2025 455.13
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7181 058-000-000-110010 455.13
Invoice Total: 455.13
5/30/2025 174.16
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7155 058-000-000-110010 174.16
Invoice Total: 174.16
5/30/2025 900.00
Invoice Description Account PO or Contract Line Item Amount
4451 SUBSCRIPTION- SCHEDULING SERVICES
FOR CITY CLERK
011-010-110-529110 250512 900.00
Invoice Total: 900.00
5/30/2025 6,462.21
VENDOR - 8107 - AJ KIRKWOOD & ASSOCIATES INC PAYMENT # 614704
VENDOR - 8108 - AMERICAN WRECKING INC PAYMENT # 614705
VENDOR - 7371 - AMOBIUS GROUP, INC PAYMENT # 614706
VENDOR - 7699 - AGA ENGINEERS, INC PAYMENT # 614702
VENDOR - 8106 - AIREF 49TH STREET IC LLC PAYMENT # 614703
VENDOR - 1948 - AT&T PAYMENT # 614707
Page 9 of 42
.
.
Item 5 Page 11 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
23448274 ACCT 9391053028 PERIOD 4/10-5/9/25 011-010-110-526010 20230186 3,730.04
Invoice Total: 3,730.04
23448275 ACCT 9391053029 PERIOD 4/10-5/9/25 011-010-110-526010 20230186 1,533.44
Invoice Total: 1,533.44
23448276 ACCT 9391053030 PERIOD 4/10-5/9/25 056-060-600-526010 20230186 916.68
Invoice Total: 916.68
23448706 ACCT 9391060354 PERIOD 4/10-5/9/25 011-010-110-526010 20230186 282.05
Invoice Total: 282.05
5/30/2025 3,040.14
Invoice Description Account PO or Contract Line Item Amount
04202025 ACCT 323 277-8949 504 0 PERIOD 3/20-
4/19/25
056-060-600-526010 20230186 3,040.14
Invoice Total: 3,040.14
5/30/2025 46.23
Invoice Description Account PO or Contract Line Item Amount
832176480X051
62025
ACCT 832176480 PERIOD 4/9-5/8/25 011-010-110-526010 46.23
Invoice Total: 46.23
5/30/2025 348.21
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7190 058-000-000-110010 348.21
Invoice Total: 348.21
5/30/2025 494.68
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7142 058-000-000-110010 494.68
VENDOR - 8109 - BALI CONSTRUCTION PAYMENT # 614710
VENDOR - 7904 - BHL INDUSTRIES PAYMENT # 614711
VENDOR - 1948 - AT&T PAYMENT # 614708
VENDOR - 2889 - AT&T MOBILITY PAYMENT # 614709
Page 10 of 42
.
.
Item 5 Page 12 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Total: 494.68
5/30/2025 4,368.55
Invoice Description Account PO or Contract Line Item Amount
24082 INMATE HOUSING SERVICES 011-030-300-529220 20250124 4,368.55
Invoice Total: 4,368.55
5/30/2025 697.52
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7110 058-000-000-110010 697.52
Invoice Total: 697.52
5/30/2025 319.20
Invoice Description Account PO or Contract Line Item Amount
658155 CYLINDER RENTAL 055-050-586-529003- 250065 319.20
Invoice Total: 319.20
5/30/2025 2,563.90
Invoice Description Account PO or Contract Line Item Amount
10810332505 DELL HARDWARE WARRANTY FOR 2
SERVERS
011-010-110-529110 250459 2,563.90
Invoice Total: 2,563.90
5/30/2025 1,150.00
Invoice Description Account PO or Contract Line Item Amount
VPD25006 BACKGROUND INVESTIGATION 011-030-300-529215 20240126 1,150.00
Invoice Total: 1,150.00
5/30/2025 1,958.28
VENDOR - 3846 - CITY OF HUNTINGTON PARK PAYMENT # 614712
VENDOR - 6567 - DONALD C. LACHER PAYMENT # 614716
VENDOR - 997 - FORD OF MONTEBELLO, INC PAYMENT # 614717
VENDOR - 5567 - CLW FOODS, LLC PAYMENT # 614713
VENDOR - 310 - CRAIG WELDING SUPPLY, CO PAYMENT # 614714
VENDOR - 1206 - DELL MARKETING LP PAYMENT # 614715
Page 11 of 42
.
.
Item 5 Page 13 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
565391 AUTO PARTS 011-040-420-522000 250053 2,787.03
Invoice Total: 2,787.03
CM565391 AUTO PARTS 011-040-420-522000 250053 (828.75)
Invoice Total: (828.75)
5/30/2025 4,800.21
Invoice Description Account PO or Contract Line Item Amount
383206 MODEMS FOR PD VEHICLES 011-010-110-529110 250489 4,800.21
Invoice Total: 4,800.21
5/30/2025 228.19
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#6092 056-000-000-110010 228.19
Invoice Total: 228.19
5/30/2025 2,663.08
Invoice Description Account PO or Contract Line Item Amount
11122 EXECUTIVE RECRUITMENT SERVICES - HR
DIRECTOR
011-010-120-529215 20250123 2,663.08
Invoice Total: 2,663.08
5/30/2025 651.92
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7187 058-000-000-110010 651.92
Invoice Total: 651.92
5/30/2025 130.00
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 7983 - FUTURE TECHNOLOGIES VENTURE LLC PAYMENT # 614718
VENDOR - 7956 - IVAN SANCHEZ PAYMENT # 614722
VENDOR - 7190 - G & M HOLDINGS PAYMENT # 614719
VENDOR - 7910 - GVP VENTURES, INC PAYMENT # 614720
VENDOR - 8112 - INTEGRATED DEMOLITION &
REMEDIATION INC
PAYMENT # 614721
Page 12 of 42
.
.
Item 5 Page 14 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
24521 WINDOW TINT 011-040-420-529000 250523 130.00
Invoice Total: 130.00
5/30/2025 203.55
Invoice Description Account PO or Contract Line Item Amount
52125 SCAG CONFERENCE REIMBURSEMENT 011-010-100-529500 203.55
Invoice Total: 203.55
5/30/2025 250.00
Invoice Description Account PO or Contract Line Item Amount
25006VPD POLYGRAPH EXAMINATION 011-030-300-529215 20230053 250.00
Invoice Total: 250.00
5/30/2025 50.00
Invoice Description Account PO or Contract Line Item Amount
25ASRE194 PARCEL MANAGEMENT SYSTEM- APR 2025 011-010-110-529110 20250097 50.00
Invoice Total: 50.00
5/30/2025 700.00
Invoice Description Account PO or Contract Line Item Amount
1802 DJ SERVICE FOR SUMMER POWER PL 011-010-150-525000 20250401 700.00
Invoice Total: 700.00
5/30/2025 62.00
Invoice Description Account PO or Contract Line Item Amount
051625 LIVESCAN REIMBURSEMENT 011-010-120-529215 62.00
Invoice Total: 62.00
VENDOR - 7737 - JESUS RIVERA PAYMENT # 614723
VENDOR - 7836 - JOE MAR POLYGRAPH PAYMENT # 614724
VENDOR - 1792 - LA COUNTY ASSESSOR OFFICE PAYMENT # 614725
VENDOR - 8094 - LUKE J SENSEBE PAYMENT # 614726
VENDOR - 8118 - MARIE MOORE PAYMENT # 614727
Page 13 of 42
.
.
Item 5 Page 15 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/30/2025 40.00
Invoice Description Account PO or Contract Line Item Amount
M19378 FIRE EXTINGUISHER MAINTENANCE 011-040-415-529000 20250063 40.00
Invoice Total: 40.00
5/30/2025 768.90
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7176 058-000-000-110010 768.90
Invoice Total: 768.90
5/30/2025 85.22
Invoice Description Account PO or Contract Line Item Amount
274397 AUTO PARTS 011-040-420-522000 250045 85.22
Invoice Total: 85.22
5/30/2025 729.83
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7194 058-000-000-110010 729.83
Invoice Total: 729.83
5/30/2025 532.95
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7198 058-000-000-110010 532.95
Invoice Total: 532.95
5/30/2025 720.69
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7119 058-000-000-110010 720.69
VENDOR - 3231 - MARX BROS FIRE EXTINGUISHER CO INC PAYMENT # 614728
VENDOR - 8113 - MILLIE & SEVERSON INC PAYMENT # 614729
VENDOR - 309 - NAPA AUTO PARTS PAYMENT # 614730
VENDOR - 3106 - OCEAN BLUE ENVIRONMENTAL
SERVICES, INC
PAYMENT # 614731
VENDOR - 7944 - OPPENHEIMER NATIONAL PAYMENT # 614732
VENDOR - 8114 - PETERSON GRADING AND PAVING PAYMENT # 614733
Page 14 of 42
.
.
Item 5 Page 16 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Total: 720.69
5/30/2025 667.21
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7112 058-000-000-110010 667.21
Invoice Total: 667.21
5/30/2025 4,809.00
Invoice Description Account PO or Contract Line Item Amount
327279 PRYOR Q2 2025 RENEWALS 055-050-586-529670- 250516 3,206.00
327279 PRYOR Q2 2025 RENEWALS 055-050-550-529670 250516 1,603.00
Invoice Total: 4,809.00
5/30/2025 1,134.06
Invoice Description Account PO or Contract Line Item Amount
94540 MONITOR ARMS FOR PD DISPATCH 011-010-110-529110 250481 60.00
94540 MONITOR ARMS FOR PD DISPATCH 011-010-110-529110 250481 1,074.06
Invoice Total: 1,134.06
5/30/2025 460.31
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7188 058-000-000-110010 460.31
Invoice Total: 460.31
5/30/2025 878.82
Invoice Description Account PO or Contract Line Item Amount
73346281 ACCT SV646197 PERIOD APR 2025 011-010-110-526010 20250239 878.82
Invoice Total: 878.82
VENDOR - 8115 - PROPORTION FOODS LLC PAYMENT # 614734
VENDOR - 159 - PRYOR LEARNING SOLUTIONS, INC PAYMENT # 614735
VENDOR - 6153 - RUSS BASSETT CORP PAYMENT # 614736
VENDOR - 8116 - SIGNAL HILL CONSTRUCTION PAYMENT # 614737
VENDOR - 1481 - VERIZON WIRELESS PAYMENT # 614738
Page 15 of 42
.
.
Item 5 Page 17 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/30/2025 383.99
Invoice Description Account PO or Contract Line Item Amount
052025 REFUND ON CLOSED ACCT#7170 058-000-000-110010 383.99
Invoice Total: 383.99
5/30/2025 2,338.53
Invoice Description Account PO or Contract Line Item Amount
40507204 MANAGED PRINT SERVICES PERIOD MAY
2025
011-010-110-529110 2,338.53
Invoice Total: 2,338.53
5/29/2025 3,094.50
Invoice Description Account PO or Contract Line Item Amount
052925 PAYROLL CHECKS 011-000-000-210110 3,094.50
Invoice Total: 3,094.50
VENDOR - 743 - XEROX CORPORATION PAYMENT # 614740
PAYROLL CHECKS
VENDOR - 8117 - WHITING-TURNER CONTRACTING PAYMENT # 614739
Page 16 of 42
.
.
Item 5 Page 18 of 44
8,013,749.09
5/29/2025 4,750.00
Invoice Description Account PO or Contract Line Item Amount
050625 MAY OFF CYCLE EMPLOYER
CONTRIBUTION
011-010-130-513030 1,000.00
050625 MAY OFF CYCLE EMPLOYER
CONTRIBUTION
011-030-300-513030 1,250.00
050625 MAY OFF CYCLE EMPLOYER
CONTRIBUTION
011-040-430-513030 1,250.00
050625 MAY OFF CYCLE EMPLOYER
CONTRIBUTION
058-070-700-513030 1,250.00
Invoice Total: 4,750.00
5/19/2025 260.80
Invoice Description Account PO or Contract Line Item Amount
422075238001 SUPPLIES 011-010-130-522000 260.80
Invoice Total: 260.80
5/19/2025 299,942.00
Invoice Description Account PO or Contract Line Item Amount
PV0525 MAY 2025 CAPACITY 055-050-590-520180 253,092.00
PV0525 APRIL 2025 ENERGY 055-050-590-520150 36,850.00
PV0525 PSF 055-000-000-122100 10,000.00
Invoice Total: 299,942.00
5/19/2025 4,035.00
Invoice Description Account PO or Contract Line Item Amount
494057 APRIL 2025 055-050-590-520160 4,035.00
Invoice Total: 4,035.00
VENDOR - 2517 - SCPPA PAYMENT # 19849
VENDOR - 7225 - TWIN EAGLE HOLDINGS N.A., LLC PAYMENT # 19850
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
ELECTRONIC TOTAL:
VENDOR - 4239 - HSA BANK PAYMENT # 19812
VENDOR - 2190 - OFFICE DEPOT PAYMENT # 19848
Page 17 of 42
.
.
Item 5 Page 19 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/20/2025 537.67
Invoice Description Account PO or Contract Line Item Amount
050125 ACCT 700388948624 SERVICE 04/01/25-
4/30/25
011-040-430-526000 537.67
Invoice Total: 537.67
5/20/2025 556.68
Invoice Description Account PO or Contract Line Item Amount
050125(2) ACCT 700356726234 SERVICE 04/01/25-
04/3025
055-050-590-526010 556.68
Invoice Total: 556.68
5/19/2025 1,086,196.73
Invoice Description Account PO or Contract Line Item Amount
2025051331-
69238177
REVISED CHARGES 04/23 055-050-590-520190 (1,645.45)
2025051331-
69238177
REVISED CHARGES 04/23 055-050-590-520150 (858.15)
2025051331-
69238177
REVISED CHARGES 01/25 055-050-590-520150 (401.96)
2025051331-
69238177
REVISED CHARGES 01/25 055-050-590-520170 (24.70)
2025051331-
69238177
REVISED CHARGES 01/25 055-050-590-520190 (8.78)
2025051331-
69238177
REVISED CHARGES 08/17 055-050-590-520170 (54,557.39)
2025051331-
69238177
INITIAL CHARGES 04/25 055-050-590-520240 9,918.34
2025051331-
69238177
INITIAL CHARGES 04/25 055-050-590-520210 11,892.28
2025051331-
69238177
INITIAL CHARGES 04/25 055-050-590-520190 7,240.51
2025051331-
69238177
INITIAL CHARGES 04/25 055-050-590-520180 (3,666.33)
VENDOR - 59 - SO CAL EDISON PAYMENT # 19851
VENDOR - 59 - SO CAL EDISON PAYMENT # 19852
VENDOR - 2412 - CALIFORNIA ISO PAYMENT # 19853
Page 18 of 42
.
.
Item 5 Page 20 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
2025051331-
69238177
INITIAL CHARGES 04/25 055-050-590-520170 893,107.21
2025051331-
69238177
INITIAL CHARGES 04/25 055-050-590-520150 182,365.32
2025051331-
69238177
INITIAL CHARGES 05/25 055-050-590-520150 39,315.89
2025051331-
69238177
INITIAL CHARGES 05/25 055-050-590-520170 293.10
2025051331-
69238177
INITIAL CHARGES 05/25 055-050-590-520190 1,206.03
2025051331-
69238177
INITIAL CHARGES 05/25 055-050-590-520210 2,020.81
Invoice Total: 1,086,196.73
5/19/2025 1,331.45
Invoice Description Account PO or Contract Line Item Amount
2025051331-
69238017
REVISED CHARGES 08/17 055-450-590-450340 1,331.45
Invoice Total: 1,331.45
5/19/2025 255,978.13
Invoice Description Account PO or Contract Line Item Amount
25862 CALPERS PAYROLL WARRANT 250515 011-000-000-210240 172,968.99
25862 CALPERS PAYROLL WARRANT 250515 055-000-000-210240 68,205.68
25862 CALPERS PAYROLL WARRANT 250515 056-000-000-210240 4,107.37
25862 CALPERS PAYROLL WARRANT 250515 058-000-000-210240 10,602.81
25862 CALPERS PAYROLL WARRANT 250515 059-000-000-210240 94.35
25862 CALPERS PAYROLL WARRANT 250515 011-010-130-523034 (1.07)
Invoice Total: 255,978.13
5/19/2025 1,374.81
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 714 - CALPERS PAYMENT # 19896
VENDOR - 3146 - CITY OF VERNON, FSA ACCOUNT PAYMENT # 19898
VENDOR - 2412 - CALIFORNIA ISO PAYMENT # 19854
Page 19 of 42
.
.
Item 5 Page 21 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
25867 WARRANT 250515 011-000-000-100013 1,374.81
Invoice Total: 1,374.81
5/20/2025 982.08
Invoice Description Account PO or Contract Line Item Amount
25888 CALPERS PAYROLL WARRANT 2505S2 055-000-000-210240 982.08
Invoice Total: 982.08
5/20/2025 230.85
Invoice Description Account PO or Contract Line Item Amount
25889 STATE WITHHOLDING PAYROLL WARRANT
2505S2
055-000-000-210210 230.85
Invoice Total: 230.85
5/20/2025 852.15
Invoice Description Account PO or Contract Line Item Amount
25891 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 2505S2
055-000-000-210210 852.15
Invoice Total: 852.15
5/21/2025 279.44
Invoice Description Account PO or Contract Line Item Amount
25965 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 2505S3
011-000-000-210210 279.44
Invoice Total: 279.44
5/23/2025 1,273.10
Invoice Description Account PO or Contract Line Item Amount
19783487 CAMERA PROJECT 011-010-110-522010 250465 1,273.10
Invoice Total: 1,273.10
VENDOR - 714 - CALPERS PAYMENT # 19901
VENDOR - 5460 - 247CCTV, INC PAYMENT # 19907
VENDOR - 1635 - EMPLOYMENT DEVELOPMENT DEPT PAYMENT # 19902
VENDOR - 4075 - THE DEPARTMENT OF THE TREASURY PAYMENT # 19903
VENDOR - 4075 - THE DEPARTMENT OF THE TREASURY PAYMENT # 19906
Page 20 of 42
.
.
Item 5 Page 22 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/23/2025 6,940.00
Invoice Description Account PO or Contract Line Item Amount
17925 WORKERS COMPENSATION
ADMINISTRATOR
011-010-120-529220 20250223 6,940.00
Invoice Total: 6,940.00
5/23/2025 3,055.50
Invoice Description Account PO or Contract Line Item Amount
101175 CROSSING GUARD SERVICES 011-010-160-529215 20240119 3,055.50
Invoice Total: 3,055.50
5/23/2025 3,298.00
Invoice Description Account PO or Contract Line Item Amount
1028544 LEGAL SERVICES 011-010-115-529200 20250356 3,298.00
Invoice Total: 3,298.00
5/23/2025 2,899.55
Invoice Description Account PO or Contract Line Item Amount
5747 SUPPLIES ULTRA COOLANT 055-050-586-529000- 250449 2,899.55
Invoice Total: 2,899.55
5/23/2025 14,485.00
Invoice Description Account PO or Contract Line Item Amount
135808 APRIL 2025 055-050-590-520160 14,485.00
Invoice Total: 14,485.00
5/23/2025 21,227.55
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 7976 - ADMINSURE INC PAYMENT # 19908
VENDOR - 1490 - ALL CITY MANAGEMENT SERVICES, INC. PAYMENT # 19909
VENDOR - 1401 - CENTRAL BASIN MWD PAYMENT # 19913
VENDOR - 5506 - BEST BEST & KRIEGER, LLP PAYMENT # 19910
VENDOR - 7519 - BURCKHARDT COMPRESSION (US) INC PAYMENT # 19911
VENDOR - 2060 - CALPINE CORPORATION PAYMENT # 19912
Page 21 of 42
.
.
Item 5 Page 23 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
VERAPR25 PURCHASED WATER - APRIL 2025 058-070-700-520130 4,651.71
VERAPR25 PURCHASED WATER - APRIL 2025 055-050-586-520135- 16,575.84
Invoice Total: 21,227.55
5/23/2025 8,775.00
Invoice Description Account PO or Contract Line Item Amount
04253661581 APRIL 2025 055-050-590-520160 8,775.00
Invoice Total: 8,775.00
5/23/2025 19,298.00
Invoice Description Account PO or Contract Line Item Amount
819047 SUBSCRIPTION- CYBERNETICS SAN
RENEWAL
011-010-110-529110 250492 19,298.00
Invoice Total: 19,298.00
5/23/2025 2,518.00
Invoice Description Account PO or Contract Line Item Amount
1000705436 SERVICE CALL 055-050-586-529000- 20250138 1,524.00
Invoice Total: 1,524.00
1000705506 SERVICE CALL 055-050-586-529000- 20250138 994.00
Invoice Total: 994.00
5/23/2025 35,628.00
Invoice Description Account PO or Contract Line Item Amount
48999 PROFESSIONAL SERVICES THROUGH
3/31/25
055-050-580-529200 20250109 14,018.00
Invoice Total: 14,018.00
49596 PROFESSIONAL SERVICES THROUGH
4/30/25
055-050-580-529200 20250109 21,610.00
Invoice Total: 21,610.00
VENDOR - 6298 - CIMA ENERGY, LP PAYMENT # 19914
VENDOR - 3705 - CONTEMPORARY CYBERNETICS GROUP,
INC.
PAYMENT # 19915
VENDOR - 7326 - COSCO FIRE PROTECTION, INC PAYMENT # 19916
VENDOR - 7145 - DUNCAN WEINBERG GENZER &
PEMBROKE, P.C.
PAYMENT # 19917
Page 22 of 42
.
.
Item 5 Page 24 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/23/2025 18,840.00
Invoice Description Account PO or Contract Line Item Amount
4452871 APRIL 2025 055-050-590-520160 18,840.00
Invoice Total: 18,840.00
5/23/2025 15,500.00
Invoice Description Account PO or Contract Line Item Amount
900005765 ENTERPRISE AGREEMENT YR3 4/21/25-
4/20/26
011-010-110-529110 20230248 15,500.00
Invoice Total: 15,500.00
5/23/2025 456.75
Invoice Description Account PO or Contract Line Item Amount
23401 ADDITIONAL PRI LINE AGREEMENT 011-010-110-529110 20250308 456.75
Invoice Total: 456.75
5/23/2025 1,250.00
Invoice Description Account PO or Contract Line Item Amount
0425001688006 APRIL 2025 055-050-590-529215 107.50
Invoice Total: 107.50
0425001688088 APRIL 2025 055-050-590-529215 1,142.50
Invoice Total: 1,142.50
5/23/2025 30,902.00
Invoice Description Account PO or Contract Line Item Amount
D3775700022 PROFESSIONAL SERVICES THROUGH
4/25/2025
055-050-580-529225 20240020 1,934.75
VENDOR - 3982 - ENVIRONMENTAL SYSTEMS RESEARCH
INSTITUTE
PAYMENT # 19919
VENDOR - 7353 - EXTENDED OFFICE SOLUTIONS, INC PAYMENT # 19920
VENDOR - 4500 - ICE US OTC COMMODITY MARKETS, LLC PAYMENT # 19921
VENDOR - 4116 - EDF, INC. PAYMENT # 19918
VENDOR - 6886 - JACOBS ENGINEERING GROUP, INC PAYMENT # 19922
Page 23 of 42
.
.
Item 5 Page 25 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
D3775700022 PROFESSIONAL SERVICES THROUGH
4/25/2025
056-060-600-529225 20240020 223.00
D3775700022 PROFESSIONAL SERVICES THROUGH
4/25/2025
055-050-586-529235- 20240020 25,027.50
D3775700022 PROFESSIONAL SERVICES THROUGH
4/25/2025
055-050-560-529215 20240020 3,716.75
Invoice Total: 30,902.00
5/23/2025 27,275.84
Invoice Description Account PO or Contract Line Item Amount
PSI00730004 VARIABLE FREQUENCY DRIVES 058-070-700-660000 250255 27,275.84
Invoice Total: 27,275.84
5/23/2025 811.29
Invoice Description Account PO or Contract Line Item Amount
137369 MISC PARTS 058-070-700-529000 250012 347.57
Invoice Total: 347.57
137381 MISC PARTS 058-070-700-529000 250012 132.72
Invoice Total: 132.72
137390 MISC PARTS 058-070-700-529000 250012 185.12
Invoice Total: 185.12
137631 MISC SUPPLIES 058-070-700-522000 250012 145.88
Invoice Total: 145.88
5/23/2025 323,760.00
Invoice Description Account PO or Contract Line Item Amount
GASI00204058 APRIL 2025 055-050-590-520160 323,760.00
Invoice Total: 323,760.00
5/23/2025 2,111.96
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 6086 - MACQUARIE ENERGY NORTH AMERICA
TRADING
PAYMENT # 19925
VENDOR - 1150 - MCMASTER-CARR SUPPLY COMPANY PAYMENT # 19926
VENDOR - 7079 - JO-KELL, INC PAYMENT # 19923
VENDOR - 804 - LB JOHNSON INDUSTRIAL HARDWARE PAYMENT # 19924
Page 24 of 42
.
.
Item 5 Page 26 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
43730749 PARTS & SUPPLIES 055-050-586-529000- 250058 285.01
Invoice Total: 285.01
44109876 SUPPLIES - BATTERY & CHARGER 055-050-570-529000 250037 707.13
Invoice Total: 707.13
44394082 SUPPLIES 055-050-586-522000- 250058 616.04
Invoice Total: 616.04
44568401 PARTS & SUPPLIES 058-070-700-529000 250107 154.58
Invoice Total: 154.58
44870142 PARTS & SUPPLIES 058-070-700-529000 250107 349.20
Invoice Total: 349.20
5/23/2025 1,000.21
Invoice Description Account PO or Contract Line Item Amount
210582IN TAGGING SERVICES- MAY 2025 055-050-590-529215 250146 1,000.21
Invoice Total: 1,000.21
5/23/2025 10,500.00
Invoice Description Account PO or Contract Line Item Amount
247315 APRIL 2025 055-050-590-520160 10,500.00
Invoice Total: 10,500.00
5/23/2025 192.00
Invoice Description Account PO or Contract Line Item Amount
1383 CAR WASHES 011-030-300-527000 250014 72.00
Invoice Total: 72.00
1384 CAR WASHES 011-030-300-527000 250014 120.00
Invoice Total: 120.00
5/23/2025 1,026.00
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 629 - OPEN ACCESS TECHNOLOGY INTL PAYMENT # 19927
VENDOR - 5908 - PACIFIC SUMMIT ENERGY, LLC PAYMENT # 19928
VENDOR - 870 - PARNASA TOV INC PAYMENT # 19929
VENDOR - 3701 - RAFAEL LANDA PAYMENT # 19930
Page 25 of 42
.
.
Item 5 Page 27 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
051925 TUITION REIMBURSEMENT 011-010-120-529680 1,026.00
Invoice Total: 1,026.00
5/23/2025 17,456.26
Invoice Description Account PO or Contract Line Item Amount
525 RESOLUTION BILLING - MAY 2025 055-050-580-529215 10,450.00
525 RESOLUTION BILLING - MAY 2025 055-050-590-529200 7,006.26
Invoice Total: 17,456.26
5/23/2025 35,240.18
Invoice Description Account PO or Contract Line Item Amount
DH0525 MAY 2025 055-050-590-520154 35,240.18
Invoice Total: 35,240.18
5/23/2025 257.79
Invoice Description Account PO or Contract Line Item Amount
S4233377001 PARTS & SUPPLIES 056-060-600-529000 250016 257.79
Invoice Total: 257.79
5/23/2025 24,669.00
Invoice Description Account PO or Contract Line Item Amount
7501824925 MAY 2025 055-050-590-520170 24,669.00
Invoice Total: 24,669.00
5/23/2025 4,696.11
Invoice Description Account PO or Contract Line Item Amount
INV00839527 DELL MONITOR FOR PD DISPATCH 011-010-110-529110 250488 40.00
INV00839527 DELL MONITOR FOR PD DISPATCH 011-010-110-529110 250488 4,656.11
Invoice Total: 4,696.11
VENDOR - 2517 - SCPPA PAYMENT # 19931
VENDOR - 2517 - SCPPA PAYMENT # 19932
VENDOR - 4229 - SMARDAN SUPPLY CO PAYMENT # 19933
VENDOR - 59 - SO CAL EDISON PAYMENT # 19934
VENDOR - 6711 - SOUTHERN COMPUTER WAREHOUSE, INC PAYMENT # 19935
Page 26 of 42
.
.
Item 5 Page 28 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/23/2025 3,129.00
Invoice Description Account PO or Contract Line Item Amount
25871 MAY 2025 TEAMSTERS ASSOCIATION DUES 011-000-000-210250 2,360.40
25871 MAY 2025 TEAMSTERS ASSOCIATION DUES 055-000-000-210250 327.60
25871 MAY 2025 TEAMSTERS ASSOCIATION DUES 058-000-000-210250 441.00
Invoice Total: 3,129.00
5/23/2025 302,016.21
Invoice Description Account PO or Contract Line Item Amount
0425 APRIL 2025 055-050-590-525022 302,016.21
Invoice Total: 302,016.21
5/23/2025 4,416.25
Invoice Description Account PO or Contract Line Item Amount
28593 SERVICES - BOOSTER PLANT #2 058-070-700-529000 20250232 2,176.00
Invoice Total: 2,176.00
28594 SERVICES - BOOSTER PLANT #3 058-070-700-529000 20250232 2,240.25
Invoice Total: 2,240.25
5/23/2025 4,000.00
Invoice Description Account PO or Contract Line Item Amount
25508655 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-660005 IT-0152 3,200.00
Invoice Total: 3,200.00
25509213 TYLER TECHNOLOGIES ERP SYSTEM 011-010-110-660005 IT-0152 800.00
Invoice Total: 800.00
5/23/2025 1,951.69
VENDOR - 1581 - THE GAS COMPANY PAYMENT # 19937
VENDOR - 5556 - TOTAL POWER SOLUTIONS LLC PAYMENT # 19938
VENDOR - 1447 - TYLER TECHNOLOGIES, INC PAYMENT # 19939
VENDOR - 5392 - TEAMSTERS LOCAL 911 PAYMENT # 19936
VENDOR - 3407 - VERNON POLICE OFFICERS BENEFIT PAYMENT # 19940
Page 27 of 42
.
.
Item 5 Page 29 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
25868 VERNON POLICE DUES WARRANT 011-000-000-210250 1,951.69
Invoice Total: 1,951.69
5/23/2025 193,864.32
Invoice Description Account PO or Contract Line Item Amount
033125 GROUNDWATER PROD & ASSESSMENT
MONTH ENDING 3/31/25
058-070-700-520110 158,980.60
Invoice Total: 158,980.60
202420 QUARTERLY PAYMENT - NO. 20 058-000-000-272010 34,883.72
Invoice Total: 34,883.72
5/23/2025 8,625.00
Invoice Description Account PO or Contract Line Item Amount
17022691 SYNCTA SOFTWARE 011-020-200-529225 8,625.00
Invoice Total: 8,625.00
5/23/2025 90.32
Invoice Description Account PO or Contract Line Item Amount
886411481 SUPPLIES 055-050-586-529000- 90.32
Invoice Total: 90.32
5/27/2025 329,877.58
Invoice Description Account PO or Contract Line Item Amount
2025052031-
69384816
INITIAL CHARGES 05/25 055-050-590-520150 297,348.33
2025052031-
69384816
INITIAL CHARGES 05/25 055-050-590-520190 14,909.16
2025052031-
69384816
INITIAL CHARGES 05/25 055-050-590-520210 12,483.59
VENDOR - 249 - FEDERAL EXPRESS CORPORATION PAYMENT # 19943
VENDOR - 2412 - CALIFORNIA ISO PAYMENT # 19944
VENDOR - 1658 - WATER REPLENISHMENT DISTRICT PAYMENT # 19941
VENDOR - 6666 - WATTS REGULATOR COMPANY PAYMENT # 19942
Page 28 of 42
.
.
Item 5 Page 30 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
2025052031-
69384816
INITIAL CHARGES 05/25 055-050-590-520170 (3,647.19)
2025052031-
69384816
REVISED CHARGES 02/25 055-050-590-520170 504.82
2025052031-
69384816
REVISED CHARGES 02/25 055-050-590-520150 (350.07)
2025052031-
69384816
REVISED CHARGES 02/25 055-050-590-520190 42.39
2025052031-
69384816
REVISED CHARGES 0/25 055-050-590-520190 25.47
2025052031-
69384816
REVISED CHARGES 0/25 055-050-590-520170 8,565.75
2025052031-
69384816
REVISED CHARGES 0/25 055-050-590-520150 (4.67)
Invoice Total: 329,877.58
5/27/2025 1,039,321.72
Invoice Description Account PO or Contract Line Item Amount
4780841 APRIL 2025 055-050-590-520160 1,039,321.72
Invoice Total: 1,039,321.72
5/27/2025 40,563.82
Invoice Description Account PO or Contract Line Item Amount
3DINV-55349 2023 055-050-590-520154 40,563.82
Invoice Total: 40,563.82
5/27/2025 17,042.50
Invoice Description Account PO or Contract Line Item Amount
236965 APRIL 2025 055-050-590-520160 17,042.50
Invoice Total: 17,042.50
5/27/2025 53,660.00
VENDOR - 6262 - MERCURIA ENERGY AMERICA, LLC PAYMENT # 19945
VENDOR - 7456 - 3DEGREES GROUP, INC PAYMENT # 19946
VENDOR - 5388 - CONOCOPHILLIPS COMPANY PAYMENT # 19947
VENDOR - 7099 - CRC MARKETING, INC PAYMENT # 19948
Page 29 of 42
.
.
Item 5 Page 31 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
5017512 APRIL 2025 055-050-590-520160 53,660.00
Invoice Total: 53,660.00
5/27/2025 9,505.95
Invoice Description Account PO or Contract Line Item Amount
6655199370 CREDIT 055-050-586-520235- LP-0765 (40,473.54)
Invoice Total: (40,473.54)
6655199371 CREDIT 055-050-586-520235- LP-0765 (1,831.20)
Invoice Total: (1,831.20)
665522760 CREDIT 055-050-586-520235- LP-0765 (89,159.76)
Invoice Total: (89,159.76)
6670755800 WATER TREATMENT SERVICES MGS 055-050-586-520235- LP-0765 44,832.51
Invoice Total: 44,832.51
6670756273 WATER TREATMENT SERVICES MGS 055-050-586-520235- LP-0765 17,809.65
Invoice Total: 17,809.65
6670770546 WATER TREATMENT SERVICES MGS 055-050-586-520235- LP-0765 21,664.64
Invoice Total: 21,664.64
6670784983 WATER TREATMENT SERVICES MGS 055-050-586-520235- LP-0765 22,885.60
Invoice Total: 22,885.60
6670799059 WATER TREATMENT SERVICES MGS 055-050-586-520235- LP-0765 26,440.96
Invoice Total: 26,440.96
6670799602 WATER TREATMENT SERVICES MGS 055-050-586-520235- LP-0765 7,337.09
Invoice Total: 7,337.09
5/27/2025 39,303.60
Invoice Description Account PO or Contract Line Item Amount
8017 FEBRUARY 2025 055-050-590-529215 LP-0463 7,860.72
Invoice Total: 7,860.72
8040 JUNE 2025 055-050-590-529215 LP-0463 7,860.72
VENDOR - 7321 - NALCO COMPANY LLC PAYMENT # 19949
VENDOR - 7918 - YES ENERGY LLC PAYMENT # 19950
Page 30 of 42
.
.
Item 5 Page 32 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Total: 7,860.72
8041 MAY 2025 055-050-590-529215 LP-0463 7,860.72
Invoice Total: 7,860.72
8042 APRIL 2025 055-050-590-529215 LP-0463 7,860.72
Invoice Total: 7,860.72
8043 MARCH 2025 055-050-590-529215 LP-0463 7,860.72
Invoice Total: 7,860.72
5/23/2025 111,113.97
Invoice Description Account PO or Contract Line Item Amount
052225 PURCHASE CARD STATEMENT 05/25 999-000-000-200105 111,113.97
Invoice Total: 111,113.97
5/28/2025 46.62
Invoice Description Account PO or Contract Line Item Amount
051225 ACCT 12710008009 SERVICE 4/9/25-5/8/25 011-040-415-526000 46.62
Invoice Total: 46.62
5/28/2025 21.92
Invoice Description Account PO or Contract Line Item Amount
051325 ACCT 10220033335 SERVICE 4/10/25-5/9/25 056-060-600-526000 21.92
Invoice Total: 21.92
5/30/2025 10,972.41
Invoice Description Account PO or Contract Line Item Amount
796656 SERVICES AGREEMENT 056-060-600-529000 20240134 7,754.28
Invoice Total: 7,754.28
796774 SERVICES AGREEMENT 056-060-600-529000 20240134 3,218.13
Invoice Total: 3,218.13
VENDOR - 5594 - US BANK CORPORATE PAYMENT # 19951
VENDOR - 1581 - THE GAS COMPANY PAYMENT # 19952
VENDOR - 1581 - THE GAS COMPANY PAYMENT # 19953
VENDOR - 4840 - GENERAL ENGINEERING CONTRACTING
INC.
PAYMENT # 19955
Page 31 of 42
.
.
Item 5 Page 33 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/30/2025 2,032.14
Invoice Description Account PO or Contract Line Item Amount
4228384294 UNIFORM SERVICES 055-050-586-524000- 20250073 368.85
4228384294 UNIFORM SERVICES 056-060-600-524000 20250073 81.05
4228384294 UNIFORM SERVICES 058-070-700-524000 20250073 119.44
4228384294 UNIFORM SERVICES 055-050-550-524000 20250073 13.36
4228384294 UNIFORM SERVICES 055-050-555-524000 20250073 142.01
Invoice Total: 724.71
4229186857 UNIFORM SERVICES 055-050-586-524000- 20250073 274.49
4229186857 UNIFORM SERVICES 056-060-600-524000 20250073 81.05
4229186857 UNIFORM SERVICES 058-070-700-524000 20250073 119.44
4229186857 UNIFORM SERVICES 055-050-550-524000 20250073 13.36
4229186857 UNIFORM SERVICES 055-050-555-524000 20250073 131.88
Invoice Total: 620.22
4229923365 UNIFORM SERVICES 055-050-586-524000- 20250073 211.12
4229923365 UNIFORM SERVICES 056-060-600-524000 20250073 81.05
4229923365 UNIFORM SERVICES 058-070-700-524000 20250073 176.73
4229923365 UNIFORM SERVICES 055-050-550-524000 20250073 13.36
4229923365 UNIFORM SERVICES 055-050-555-524000 20250073 204.95
Invoice Total: 687.21
5/30/2025 190.00
Invoice Description Account PO or Contract Line Item Amount
B3919317 PUBLICATION SERVICES - RFB 055-050-586-520235- 190.00
Invoice Total: 190.00
5/30/2025 5,657.25
Invoice Description Account PO or Contract Line Item Amount
475128 PROFESSIONAL SERVICES - APRIL 2025 055-050-580-529225 20240064 5,657.25
VENDOR - 5490 - CINTAS CORPORATION NO. 2 PAYMENT # 19956
VENDOR - 947 - DAILY JOURNAL CORPORATION PAYMENT # 19957
VENDOR - 6519 - EN ENGINEERING, LLC PAYMENT # 19958
Page 32 of 42
.
.
Item 5 Page 34 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Total: 5,657.25
5/30/2025 4,995.00
Invoice Description Account PO or Contract Line Item Amount
27871IN 2025 ANNUAL CP SURVEY 056-060-600-529225 20250079 4,995.00
Invoice Total: 4,995.00
5/30/2025 147.14
Invoice Description Account PO or Contract Line Item Amount
168366 SUPPPLIES 011-040-420-522000 250042 147.14
Invoice Total: 147.14
5/30/2025 9,000.00
Invoice Description Account PO or Contract Line Item Amount
0520254 SACA AGREEMENT - GIRLS ON THE RUN LA
COUNTY
011-010-160-529715 20250369 9,000.00
Invoice Total: 9,000.00
5/30/2025 599.20
Invoice Description Account PO or Contract Line Item Amount
9496983504 MISC ITEMS 056-060-600-529000 250009 417.91
Invoice Total: 417.91
9498942748 BLANK TAG BRASS 058-070-700-529000 250106 124.53
Invoice Total: 124.53
9498942755 MARKING PAINT 056-060-600-529000 250009 56.76
Invoice Total: 56.76
5/30/2025 10,501.73
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 1712 - GRAINGER, CO PAYMENT # 19962
VENDOR - 7079 - JO-KELL, INC PAYMENT # 19963
VENDOR - 2947 - FARWEST CORROSION CONTROL CO. PAYMENT # 19959
VENDOR - 399 - GARVEY EQUIPMENT COMPANY PAYMENT # 19960
VENDOR - 6498 - GIRLS ON THE RUN OF LA COUNTY PAYMENT # 19961
Page 33 of 42
.
.
Item 5 Page 35 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
PSI00730005 VARIABLE FREQUENCY DRIVES 058-070-700-660000 250255 10,501.73
Invoice Total: 10,501.73
5/30/2025 399.45
Invoice Description Account PO or Contract Line Item Amount
137721 MISC PARTS 055-050-560-529000 250100 399.45
Invoice Total: 399.45
5/30/2025 544.19
Invoice Description Account PO or Contract Line Item Amount
771141500 CYLINDER RENTAL 055-050-586-529000- LP-0790 544.19
Invoice Total: 544.19
5/30/2025 572.34
Invoice Description Account PO or Contract Line Item Amount
44045083 GLADIATOR CASTERS 058-070-700-660000 250107 572.34
Invoice Total: 572.34
5/30/2025 36,756.57
Invoice Description Account PO or Contract Line Item Amount
2239524 FUEL 011-000-000-120030 250094 26,846.60
Invoice Total: 26,846.60
2239525 FUEL 011-000-000-120030 250094 9,909.97
Invoice Total: 9,909.97
5/30/2025 2,400.00
Invoice Description Account PO or Contract Line Item Amount
16131 SUBSCRIPTION- GEOVIEWER MOBILE 011-010-110-529110 250510 2,400.00
Invoice Total: 2,400.00
VENDOR - 804 - LB JOHNSON INDUSTRIAL HARDWARE PAYMENT # 19964
VENDOR - 5709 - NOBEL SYSTEMS, INC PAYMENT # 19968
VENDOR - 6520 - MATHESON TRI-GAS, INC PAYMENT # 19965
VENDOR - 1150 - MCMASTER-CARR SUPPLY COMPANY PAYMENT # 19966
VENDOR - 209 - MERRIMAC PETROLEUM, INC. PAYMENT # 19967
Page 34 of 42
.
.
Item 5 Page 36 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/30/2025 3,623.32
Invoice Description Account PO or Contract Line Item Amount
S100249081001 MISCELLANEOUS PARTS 058-070-700-529000 250473 3,623.32
Invoice Total: 3,623.32
5/30/2025 12,168.00
Invoice Description Account PO or Contract Line Item Amount
18578 SECURITY SERVICES - APRIL 2025 011-040-415-529215 20230234 12,168.00
Invoice Total: 12,168.00
5/30/2025 568.42
Invoice Description Account PO or Contract Line Item Amount
S4237573001 PVC PIPE 056-060-600-529000 250016 568.42
Invoice Total: 568.42
5/30/2025 1,185,512.00
Invoice Description Account PO or Contract Line Item Amount
7501824967 LETTER AGREEMENT FOR DATA CENTER 055-050-585-660000 20240441 1,185,512.00
Invoice Total: 1,185,512.00
5/30/2025 1,172.79
Invoice Description Account PO or Contract Line Item Amount
22548 JOINT POLE COMMITTEE 055-050-585-529215 1,172.79
Invoice Total: 1,172.79
5/30/2025 180.00
VENDOR - 6340 - S & J SUPPLY COMPANY, INC PAYMENT # 19969
VENDOR - 6198 - S&S LABOR FORCE, INC PAYMENT # 19970
VENDOR - 289 - VIET NGUYEN PAYMENT # 19974
VENDOR - 4229 - SMARDAN SUPPLY CO PAYMENT # 19971
VENDOR - 59 - SO CAL EDISON PAYMENT # 19972
VENDOR - 2079 - SO CAL JOINT POLE COMMITTEE PAYMENT # 19973
Page 35 of 42
.
.
Item 5 Page 37 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
51325 PE LICENSE REIMBURSEMENT 055-050-585-529550 180.00
Invoice Total: 180.00
5/30/2025 500.00
Invoice Description Account PO or Contract Line Item Amount
051925 RENTAL AGREEMENT - JUNE 2025 055-050-595-529703- 20240080 500.00
Invoice Total: 500.00
5/30/2025 15,000.00
Invoice Description Account PO or Contract Line Item Amount
052225 VCF GRANT AGREEMENT - SE RIO VISTA
YMCA
011-010-140-529715 20250399 15,000.00
Invoice Total: 15,000.00
5/30/2025 50,644.51
Invoice Description Account PO or Contract Line Item Amount
26137 STATE WITHHOLDING PAYROLL WARRANT
250529
011-000-000-210210 27,185.95
26137 STATE WITHHOLDING PAYROLL WARRANT
250529
055-000-000-210210 19,949.19
26137 STATE WITHHOLDING PAYROLL WARRANT
250529
056-000-000-210210 1,091.31
26137 STATE WITHHOLDING PAYROLL WARRANT
250529
058-000-000-210210 2,390.83
26137 STATE WITHHOLDING PAYROLL WARRANT
250529
059-000-000-210210 27.23
Invoice Total: 50,644.51
5/29/2025 1,374.81
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 7663 - WEST SOTO STREET PARTNERS PAYMENT # 19975
VENDOR - 6081 - YMCA OF METROPOLITAN LA PAYMENT # 19976
VENDOR - 1635 - EMPLOYMENT DEVELOPMENT DEPT PAYMENT # 19994
VENDOR - 3146 - CITY OF VERNON, FSA ACCOUNT PAYMENT # 19995
Page 36 of 42
.
.
Item 5 Page 38 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
26138 FSA WARRANT 250529 011-000-000-100013 1,374.81
Invoice Total: 1,374.81
5/30/2025 154,511.57
Invoice Description Account PO or Contract Line Item Amount
26140 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 250529
011-000-000-210210 88,177.85
26140 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 250529
055-000-000-210210 56,906.01
26140 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 250529
056-000-000-210210 2,486.94
26140 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 250529
058-000-000-210210 6,883.42
26140 FWH, SSW, AND MEDICARE PAYROLL
WARRANT 250529
059-000-000-210210 57.35
Invoice Total: 154,511.57
5/29/2025 32,034.87
Invoice Description Account PO or Contract Line Item Amount
26142 DEFERRED COMPENSATION PAYROLL
WARRANT 250529
011-000-000-210220 16,083.39
26142 DEFERRED COMPENSATION PAYROLL
WARRANT 250529
055-000-000-210220 14,191.74
26142 DEFERRED COMPENSATION PAYROLL
WARRANT 250529
056-000-000-210220 375.00
26142 DEFERRED COMPENSATION PAYROLL
WARRANT 250529
058-000-000-210220 1,334.74
26142 DEFERRED COMPENSATION PAYROLL
WARRANT 250529
059-000-000-210220 50.00
Invoice Total: 32,034.87
5/28/2025 496,630.00
VENDOR - 7541 - MISSIONSQUARE RETIREMENT PAYMENT # 19997
VENDOR - 714 - CALPERS PAYMENT # 20088
VENDOR - 4075 - THE DEPARTMENT OF THE TREASURY PAYMENT # 19996
Page 37 of 42
.
.
Item 5 Page 39 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Invoice Description Account PO or Contract Line Item Amount
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-010-100-512020 2,285.00
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-010-105-512020 19,716.19
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-010-110-512020 14,898.89
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-010-115-512020 6,704.50
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-010-120-512020 13,806.30
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-010-125-512020 9,137.98
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-010-130-512020 31,089.01
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-030-300-512020 29,797.77
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-020-200-512020 21,454.39
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-040-400-512020 17,481.36
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-040-405-512020 14,104.28
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-040-410-512020 5,860.23
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-040-415-512020 7,598.43
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-040-420-512020 8,492.36
1000000178747
39
MISC (CLASSIC AND PEPRA) 011-040-430-512020 36,849.91
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-550-512020 6,803.82
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-555-512020 46,285.87
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-570-512020 1,589.21
Page 38 of 42
.
.
Item 5 Page 40 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-575-512020 10,180.91
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-580-512020 24,533.50
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-585-512020 23,093.27
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-586-512020- 67,144.31
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-590-512020 19,616.87
1000000178747
39
MISC (CLASSIC AND PEPRA) 055-050-595-512020 4,916.63
1000000178747
39
MISC (CLASSIC AND PEPRA) 056-060-600-512020 18,275.97
1000000178747
39
MISC (CLASSIC AND PEPRA) 058-070-700-512020 34,714.40
1000000178747
39
MISC (CLASSIC AND PEPRA) 059-080-800-512020 198.64
Invoice Total: 496,630.00
5/28/2025 290,358.42
Invoice Description Account PO or Contract Line Item Amount
1000000178747
52
MONTHLY EXPENSE OF UAL POLICE
(CLASSIC)
011-030-300-512020 290,358.42
Invoice Total: 290,358.42
5/28/2025 1,172.58
Invoice Description Account PO or Contract Line Item Amount
1000000178747
60
MONTHLY EXPENSE OF UAL FIRE (PEPRA) 011-030-300-512020 1,172.58
Invoice Total: 1,172.58
5/28/2025 844.50
Invoice Description Account PO or Contract Line Item Amount
VENDOR - 714 - CALPERS PAYMENT # 20089
VENDOR - 714 - CALPERS PAYMENT # 20090
VENDOR - 714 - CALPERS PAYMENT # 20091
Page 39 of 42
.
.
Item 5 Page 41 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
1000000178747
68
MONTHLY EXPENSE OF UAL POLICE
(PEPRA)
011-030-300-512020 844.50
Invoice Total: 844.50
5/28/2025 443,033.17
Invoice Description Account PO or Contract Line Item Amount
1000000178747
76
MONTHLY EXPENSE OF UAL FIRE
(CLASSIC)
011-030-305-512020 443,033.17
Invoice Total: 443,033.17
5/28/2025 150.92
Invoice Description Account PO or Contract Line Item Amount
1000000178747
84
MONTHLY EXPENSE OF UAL PROSECUTOR
(CLASSIC)
011-010-115-512020 150.92
Invoice Total: 150.92
5/29/2025 784,119.39
Invoice Description Account PO or Contract Line Item Amount
052925 PAYROLL DIRECT DEPOSIT 011-000-000-210110 472,691.29
052925 PAYROLL DIRECT DEPOSIT 055-000-000-210110 249,982.29
052925 PAYROLL DIRECT DEPOSIT 056-000-000-210110 17,546.95
052925 PAYROLL DIRECT DEPOSIT 058-000-000-210110 43,628.72
052925 PAYROLL DIRECT DEPOSIT 059-000-000-210110 270.14
Invoice Total: 784,119.39
5/29/2025 1,377.30
Invoice Description Account PO or Contract Line Item Amount
052925 PAYROLL DIRECT DEPOSIT 011-000-000-210110 1,377.30
Invoice Total: 1,377.30
VENDOR - 714 - CALPERS PAYMENT # 20093
PAYROLL DIRECT DEPOSIT
PAYROLL DIRECT DEPOSIT
VENDOR - 714 - CALPERS PAYMENT # 20092
Page 40 of 42
.
.
Item 5 Page 42 of 44
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
5/29/2025 2,803.75
Invoice Description Account PO or Contract Line Item Amount
052925 PAYROLL DIRECT DEPOSIT 058-000-000-210110 2,803.75
Invoice Total: 2,803.75
PAYROLL DIRECT DEPOSIT
Page 41 of 42
.
.
Item 5 Page 43 of 44
EARLY CHECKS TOTAL ELECTRONIC TOTAL GRAND TOTAL
191,855.20 1,908,838.30 2,100,693.50
29,843.19 5,580,648.82 5,610,492.01
4,620.09 61,639.90 66,259.99
8,829.87 350,810.39 359,640.26
697.71 697.71
111,113.97 111,113.97
235,148.35 8,013,749.09 8,248,897.44
058 - WATER
059 - FIBER
999 - POOLED
Total
FUND
011 - GENERAL
055 - LIGHT & POWER
056 - NATURAL GAS
CITY OF VERNON
OPERATING ACCOUNT
WARRANT REGISTER NO. 153
DATE 07/01/2025
Page 42 of 42
.
.
Item 5 Page 44 of 44
City Council Agenda Report
Meeting Date:July 1, 2025
From:Lisette Grizzelle, Interim Director of Human Resources
Department:Human Resources
Submitted by:Lisette Grizzelle, Interim Director of Human Resources
Subject
Employee Reclassification
Recommendation
Approve the reclassification of one Account Clerk, Senior to the existing classification of
Administrative Secretary.
Background
The Human Resources (HR) Department is responsible for the annual review of employee
reclassification requests. Consistent with the City’s Reclassification Policy, reclassification is
defined as the reallocation of a position in one class to a different class as a result of a significant
change in the duties, responsibilities, and/or qualification requirements of the position. As part
of the annual budget process, the HR Department works collaboratively with employees,
Department Directors, and the City Administrator to review and consider reclassification
requests. A reclassification is typically recommended when the incumbent employee has been
performing different work or work at a different level of responsibility or complexity than is
reflected in their current job description in excess of one year. This year, the HR Department
received one reclassification request. Following a thorough review, the position is being
recommended for reclassification to an existing classification title.
Staff is recommending the following: Reclassification of one Account Clerk, Senior (Salary Grade
G18) to Administrative Secretary (existing classification) (Salary Grade C20). The recommended
upward reclassification has been reviewed and approved by the City Administrator and is
submitted to City Council for approval. Upon approval, this reclassification would be effective
July 27, 2025. This recommendation was included as part of the Fiscal Year 2025-26 budget
presentation.
Fiscal Impact
The fiscal impact is estimated at $4,379 (Salary $3,902 and Benefits $447) associated with the
approval of this reclassification. Sufficient funds are available in Electric Fund, Public Utilities
Department, Account L& P Administration, Salaries, Account No. 055-050-580-510010 for the
current fiscal year.
Attachments
None.
.
.
Item 6 Page 1 of 1
City Council Agenda Report
Meeting Date:July 1, 2025
From:Todd Dusenberry, General Manager of Public Utilities
Department:Public Utilities
Submitted by:Adriana Ramos, Senior Management Analyst
Subject
Vernon Public Utilities 2025 Wildfire Mitigation Plan
Recommendation
A. Find that the proposed action is exempt from the California Environmental Quality Act (CEQA),
in accordance with CEQA Guidelines Section 15061(b)(3), the general rule that CEQA only
applies to projects that may have a significant effect on the environment. This action receives
and files an update to the city’s plan for the implementation of preventative strategies and
mitigation measures to minimize the risk of wildfires caused by electrical lines and equipment;
this action does not authorize any construction activity or any disturbance of an environmental
resource, and has no potential for causing a significant effect on the environment; and
B. Approve the Vernon Public Utilities 2025 Wildfire Mitigation Plan.
Background
In 2018, the California legislature adopted Senate Bill 901 (SB 901), requiring every publicly
owned electric utility (POU) to prepare and present a Wildfire Mitigation Plan (WMP) to its
governing body by January 1, 2020, and update it annually. Assembly Bill 1054 (Holden, Chapter
79, Statutes of 2019) and Assembly Bill 111 (Committee on Budget, Chapter 81, Statutes of
2019) made additional significant reforms relating to wildfires, establishing a state agency called
the California Wildfire Safety Advisory Board (Board) and requiring all POUs to submit their
WMPs to the Board each year, starting in 2020. The Board will then review the POU plans and
provide comments and advisory opinions on the content and sufficiency of the plans. At least
once every three years, the submission shall be a comprehensive revision of the plan.
On May 18, 2021, the City Council adopted Resolution No. 2021-12, approving the Vernon Public
Utilities 2021 Wildfire Mitigation Plan. Section 4 of the resolution allows the City Council to
approve subsequent annual updates and triennial comprehensive revisions by minute order.
Approval of the WMP revisions is necessary to meet state requirements.
The Board notes that many POUs have a relatively low likelihood of seeing or causing
catastrophic wildfires in their service areas, due to characteristics such as the small size of their
service area, and a service territory that is mostly, if not wholly, urban with no High Fire Threat
District areas within or abutting. The Board expects to engage with such low probability POUs to
be more appropriate in scope to the likelihood of wildfires in those areas.
In 2018, the Vernon Public Utilities (VPU) Department requested that the Vernon Fire Department
perform an assessment of the electric service territories’ risk of wildfire caused by electric
operations and equipment. The Vernon Fire Department's 2018 assessment reviewed Vernon's
historical fire data, geographical location, and local conditions. The assessment also included
information from the United States Forest Service's Fire Modeling Institute and the Office of the
State Fire Marshal of CAL FIRE. Based on this information, the determination was made that
VPU's electric equipment and operations do not pose a risk of igniting a fire that could cause any
significant or catastrophic wildfire conditions. This assessment of low risk was confirmed by an
independent evaluator in May 2023 and is incorporated in the WMP in Appendix A.
.
.
Item 7 Page 1 of 2
Notwithstanding Vernon's low wildfire risk, VPU is required to develop a WMP in accordance with
Public Utilities Code Section 8387, which requires WMPs to consider, as necessary, certain
specified elements. VPU's WMP meets all the required criteria pursuant to Section 8387,
including identification of elements that do not apply to Vernon due to the sparsity of wildfire fuel
sources and distance from High Fire-Threat District Elevated risk areas, and an independent
evaluator‘s determination that VPU's WMP addressed all required elements.
As part of this most recent update, VPU reviewed the 2024 plan for changes to the electric system
and key wildfire risks and incorporated, where feasible, the Board's recommendations.
Updates in the 2025 plan include the following:
•Revision of dates throughout the document to reflect the current year.
•Section 13: Update of all three metrics tables to include 2024 data.
Additionally, there were minor formatting and non-substantive revisions. The next triennial
comprehensive review and revision by an independent evaluator is scheduled for July 1, 2026.
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. 2025 Wildfire Mitigation Plan
2. 2025 Wildfire Mitigation Plan Redline
.
.
Item 7 Page 2 of 2
0
CITY OF VERNON PUBLIC UTILITIES
4305 S SANTA FE AVE.
VERNON, CALIFORNIA 90058
Version: 6.0
Effective Date: 7/1/2025
Wildfire
Mitigation
Plan
.
.
Item 7 Page 1 of 35
1
Contents
Executive Summary .................................................................................................................... i
Wildfire Safety Advisory Board Recommendations ............................................................. i
1. Executive Summary ........................................................................................................... 1
2. Introduction ....................................................................................................................... 1
2.1. Policy Statement ......................................................................................................... 2
2.2. Organization of the Wildfire Mitigation Plan ............................................................. 2
2.3. City of Vernon .............................................................................................................. 2
2.4. Vernon Public Utilities Profile ..................................................................................... 3
2.5. Generation and Distribution Facilities ........................................................................ 3
2.6. Wildfire Risk Assessment ............................................................................................ 3
3. Objectives .......................................................................................................................... 4
4. Roles and Responsibilities ................................................................................................ 4
4.1. Wildfire Prevention ..................................................................................................... 4
4.2. Wildfire Response and Recovery ................................................................................ 5
4.3. Standardized Emergency Management System ........................................................ 5
5. Wildfire Risks and Drivers ................................................................................................. 6
5.1. Design, Construction, Operation, and Maintenance ................................................. 6
5.2. Topographic and Climatological Risk Factors ............................................................ 6
6. Enterprise-wide Safety Risks ............................................................................................ 6
7. Wildfire Preventative Strategies ...................................................................................... 7
8. Vegetation Management .................................................................................................. 7
9. Inspections ........................................................................................................................ 9
10. De-energization Protocols .............................................................................................. 10
10.1. Reclosing Policy ......................................................................................................... 10
10.2. De-energization ......................................................................................................... 10
11. Customer Notification Procedure .................................................................................. 10
12. Restoration of Service ..................................................................................................... 11
13. Evaluation Metrics .......................................................................................................... 12
13.1. Metrics and Assumptions for Measuring Plan Performance .................................. 12
14. Impact of Metrics on Plan .............................................................................................. 14
15. Monitoring and Auditing the Plan .................................................................................. 14 .
.
Item 7 Page 2 of 35
2
15.1. Identifying and Correcting Deficiencies in the Plan ................................................. 14
15.2. Monitoring the Effectiveness of Inspections ........................................................... 14
16. Independent Evaluator ................................................................................................... 14
17. Acronym Glossary ........................................................................................................... 15
APPENDIX
A. Independent Evaluation of Vernon Plan........................................................ 16
.
.
Item 7 Page 3 of 35
i
Reference Guide
Vernon Public Utilities (VPU) is dedicated to providing safe, reliable electric services to the
residents and businesses in City of Vernon at competitive prices.
While VPU’s service territory and operations do not include or abut high wildfire threat areas,
VPU remains committed to evaluating hazards that may affect the reliability and safety of the
City of Vernon. This WMP describes the activities that VPU is taking to mitigate the threat of
power-line ignited wildfires, including its various programs, policies and procedures. This plan
will be reviewed and evaluated by its City Council on an annual basis.
Utility Overview and Context
The California Wildfire Safety Advisory Board (WSAB) issued the Guidance Advisory Opinion for
the 2023 Wildfire Mitigation Plans of Electric Publicly Owned Utilities and Rural Electric
Cooperatives (“2023 WSAB Guidance Advisory Opinion”) on November 16, 2022. VPU provides
this document to the WSAB in order to respond to the recommendations included in the 2023
WSAB Guidance Advisory Opinion. VPU will provide a narrative response and/or a cross
reference to the location in VPU’s Wildfire Mitigation Plan (WMP) where the topic is addressed.
Where the recommendation is not applicable to VPU, the response will provide a brief
description supporting this conclusion.
Table 1: Context-Setting Information
Utility Name Vernon Public Utilities (VPU)
Service Territory Size 5.2 square miles
Owned Assets ☐ Transmission ☒Distribution ☒Generation
Number of Customers
Served
2,000 customer accounts
Population Within Service
Territory
222 people
Customer Class Makeup
Number of Accounts Share of Total Load (MWh)
4% Residential;
5% Government;
0% Agricultural;
64% Small/Medium Business,
Commercial;
26% Industrial
3% Residential;
5% Government;
0% Agricultural;
64% Small/Medium Business,
Commercial;
28% Industrial
Service Territory 0% Agriculture
0% Barren/Other .
.
Item 7 Page 4 of 35
ii
Location/Topography1 0% Conifer Forest
0% Conifer Woodland
0% Desert
0% Hardwood Forest
0% Hardwood Woodland
0% Herbaceous
0% Shrub
100% Urban
0% Water
Service Territory
Wildland Urban Interface2
(based on total area)
0% Wildland Urban Interface;
0% Wildland Urban Intermix;
Percent of Service
Territory in CPUC High Fire
Threat Districts (based on
total area)
Tier 2: 0%
Tier 3: 0%
Prevailing Wind Directions
& Speeds by Season
The windier part of the year lasts for 6 months, from November to May, with
average wind speeds of more than 6.9 miles per hour. The windiest day of the
year is December 31, with an average hourly wind speed of 8.6 miles per
hour.
The calmer time of year lasts for 6 months, from May to November. The
calmest day of the year is August 10, with an average hourly wind speed of
5.3 miles per hour.
The wind is most often from the west for 5 months, from February to July,
with a peak percentage of 47% on May 23. The wind is most often from the
north for 4 months, from October to February, with a peak percentage of 36%
on January 1.
Miles of Owned Lines
Underground and/or
Overhead
Overhead Dist.: 145 miles
Overhead Trans.: 0 miles
Underground Dist.: 31 miles
Underground Trans.: 0 miles
Explanatory Note 1 - Methodology for Measuring “Miles”: measured in line
miles
Percent of Owned Lines in
CPUC High Fire Threat
Districts
Overhead Distribution Lines as % of Total Distribution System
(Inside and Outside Service Territory)
Tier 2: 0%
Tier 3: 0%
Overhead Transmission Lines as % of Total Transmission System
(Inside and Outside Service Territory)
Tier 2: 0%
Tier 3: 0%
1 This data shall be based on the California Department of Forestry and Fire Protection, California Multi-Source
Vegetation Layer Map, depicting WHR13 Types (Wildlife Habitat Relationship classes grouped into 13 major land
cover types) available at: https://www.arcgis.com/home/item.html?id=b7ec5d68d8114b1fb2bfbf4665989eb3.
2 This data shall be based on the definitions and maps maintained by the United States Department of Agriculture ,
as most recently assembled in The 2010 Wildland-Urban Interface of the Conterminous United States, available at
https://www.fs.fed.us/nrs/pubs/rmap/rmap_nrs8.pdf. .
.
Item 7 Page 5 of 35
iii
Customers have ever lost
service due to an IOU PSPS
event?
☐ Yes ☒No
Customers have ever been
notified of a potential loss
of service to due to a
forecasted IOU PSPS
event?
☐ Yes ☒No
Has developed protocols
to pre-emptively shut off
electricity in response to
elevated wildfire risks?
☐ Yes ☒No
Has previously pre-
emptively shut off
electricity in response to
elevated wildfire risk?
☐ Yes ☒No
I. Cross Reference to Statutory requirements
WSAB requested that POUs provide a clear roadmap as to where each statutory
requirement is addressed within the POU WMP.
Table 2: Cross References to Statutory Requirements
Requirement Statutory Language Location in
WMP
Persons
Responsible
PUC § 8387(b)(2)(A): An accounting of the responsibilities of
persons responsible for executing the plan. Section 4
Objectives of
the Plan
PUC § 8387(b)(2)(B): The objectives of the wildfire mitigation
plan. Section 3
Preventive
Strategies
PUC § 8387(b)(2)(C): A description of the preventive strategies
and programs to be adopted by the local publicly owned
electric utility or electrical cooperative to minimize the risk of
its electrical lines and equipment causing catastrophic wildfires,
including consideration of dynamic climate change risks.
Section 7
Evaluation
Metrics
PUC § 8387(b)(2)(D): A description of the metrics the local
publicly owned electric utility or electrical cooperative plans
to use to evaluate the wildfire mitigation plan’s performance
and the assumptions that underlie the use of those metrics.
Section 13
Impact of
Metrics
PUC § 8387(b)(2)(E): A discussion of how the application of
previously identified metrics to previous wildfire mitigation
plan performances has informed the wildfire mitigation plan.
Section 14
Deenergization
Protocols
PUC § 8387(b)(2)(F): Protocols for disabling reclosers and
deenergizing portions of the electrical distribution system that
consider the associated impacts on public safety, as well as
protocols related to mitigating the public safety impacts of
Section 10
.
.
Item 7 Page 6 of 35
iv
those protocols, including impacts on critical first responders
and on health and communication infrastructure.
Customer
Notification
Procedures
PUC § 8387(b)(2)(G): Appropriate and feasible procedures for
notifying a customer who may be impacted by the
deenergizing of electrical lines. The procedures shall consider
the need to notify, as a priority, critical first responders, health
care facilities, and operators of telecommunications
infrastructure.
Section 11
Vegetation
Management
PUC § 8387(b)(2)(H): Plans for vegetation management. Section 8
Inspections
PUC § 8387(b)(2)(I): Plans for inspections of the local publicly
owned electric utility’s or electrical cooperative’s electrical
infrastructure.
Section 9
Prioritization of
Wildfire Risks
PUC § 8387(b)(2)(J): A list that identifies, describes, and
prioritizes all wildfire risks, and drivers for those risks,
throughout the local publicly owned electric utility’s or
electrical cooperative’s service territory. The list shall include,
but not be limited to, both of the following:
(i) Risks and risk drivers associated with design, construction,
operation, and maintenance of the local publicly owned electric
utility’s or electrical cooperative’s equipment and facilities.
(ii) Particular risks and risk drivers associated with topographic
and climatological risk factors throughout the different parts of
the local publicly owned electric utility’s or electrical
cooperative’s service territory.
Section 5
CPUC Fire
Threat Map
Adjustments
PUC § 8387(b)(2)(K): Identification of any geographic area in
the local publicly owned electric utility’s or electrical
cooperative’s service territory that is a higher wildfire threat
than is identified in a commission fire threat map, and
identification of where the commission should expand a high
fire threat district based on new information or changes to the
environment.
Section 2.3
Section 2.6
Enterprisewide
Risks
PUC § 8387(b)(2)(L): A methodology for identifying and
presenting enterprisewide safety risk and wildfire-related risk. Section 6
Restoration of
Service
PUC § 8387(b)(2)(M): A statement of how the local publicly
owned electric utility or electrical cooperative will restore
service after a wildfire.
Section 12
Monitor and
Audit
PUC § 8387(b)(2)(N): A description of the processes and
procedures the local publicly owned electric utility or electrical
cooperative shall use to do all of the following
(i) Monitor and audit the implementation of the wildfire
mitigation plan.
(ii) Identify any deficiencies in the wildfire mitigation plan
or its implementation, and correct those deficiencies.
Section 15
.
.
Item 7 Page 7 of 35
v
(iii) Monitor and audit the effectiveness of electrical line
and equipment inspections, including inspections
performed by contractors, that are carried out under the
plan, other applicable statutes, or commission rules.
Qualified
Independent
Evaluator
PUC § 8387(c): The local publicly owned electric utility or
electrical cooperative shall contract with a qualified
independent evaluator with experience in assessing the safe
operation of electrical infrastructure to review and assess the
comprehensiveness of its wildfire mitigation plan. The
independent evaluator shall issue a report that shall be made
available on the Internet Web site of the local publicly owned
electric utility or electrical cooperative, and shall present the
report at a public meeting of the local publicly owned electric
utility’s or electrical cooperative’s governing board.
Section 16
II. WSAB Guidance Advisory Opinion Recommendations
Process for Utility Adoption and Submittal of Annual WMP and Opportunities for Public
Comment:
VPU is governed by the Vernon City Council. Accordingly, the 2021 Vernon Public Utilities
Wildfire Mitigation Plan was presented to the Vernon City Council on May 18, 2021, and was
adopted in Resolution No. 2021-12. Subsequent annual updates and triennial comprehensive
revisions shall be publicly presented and approved by minute order of the City Council.
Description of Where WMP Information Can be Found on Utility Website
The Vernon Public Utilities Wildfire Mitigation Plan and the independent evaluator’s report will
be posted to the City of Vernon’s website under regulatory reports3 and has been presented to
Vernon’s City Council at a noticed public meeting.
3 https://www.cityofvernon.org/government/public-utilities/regulatory-reports
.
.
Item 7 Page 8 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 1
1. Executive Summary
1.1. The Vernon Public Utilities Wildfire Mitigation Plan meets applicable California
Senate Bill 901, Assembly Bill 1054, and Assembly Bill 111 requirements.
1.2. The City of Vernon is an industrial city of 5.2 square miles, adjacent to Downtown
Los Angeles. Wildfire ignition risks are low due to the sparsity of vegetation and
fuel sources in Vernon’s industrial environment.
1.3. Vernon is located more than 10 miles from the nearest California Public Utilities
Commission (CPUC) High Fire-Threat District Elevated risk area.
1.4. Vernon Public Utilities (VPU) does not own or operate transmission, distribution,
or generation facilities in CPUC High Fire-Threat District.
1.5. VPU does not own or operate transmission, distribution, or generation facilities in
California Department of Forestry and Fire Protection’s (CAL FIRE) Fire and
Resource Assessment Program (FRAP) Fire Threat Map’s designated High or
Extreme Wildfire Hazard areas.
1.6. VPU’s Wildfire Mitigation Plan includes required program components such as
performance metrics, continuous improvement, and responsible parties.
1.7. VPU will make annual Wildfire Mitigation Plan progress updates to the Vernon
City Council and the California Wildfire Safety Advisory Board.
2. Introduction
Over the last few years, California has seen some of its most devastating and destructive
wildfires. Climate Change is recognized as a contributing factor (long hot spells, low
moisture, etc.). In response, Senate Bill (SB) 901 authored by Senator Dodd, was enacted
in 2018. SB 901 requires every electric utility to prepare a wildfire mitigation plan (WMP)
and annually present the plan to its governing body. SB 901 amended Public Utilities Code
(PUC) section 8387. Section 8387 generally requires every publicly owned utility to
construct, maintain, and operate its electrical facilities to minimize the risk of wildfire
posed by those facilities. As further required by Assembly Bill (AB) 1054 enacted in 2019,
the WMP shall be submitted to the California Wildfire Safety Advisory Board for review
and advisory opinion annually by July 1. At least once every three years, the submittal
must be a comprehensive revision of the WMP.
This document outlines Vernon Public Utilities’ activities in accordance with these
requirements.
.
.
Item 7 Page 9 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 2
2.1. Policy Statement
Vernon Public Utilities' overarching goal is to provide safe, reliable, and economic electric
service to its local community. In order to meet this goal, VPU constructs, maintains, and
operates its electrical lines and equipment in a manner that minimizes the risk of
catastrophic wildfire posed by its electrical lines and equipment.
2.2. Organization of the Wildfire Mitigation Plan
This Wildfire Mitigation Plan includes the following elements:
• Objectives of the plan;
• Roles and responsibilities for carrying out the plan;
• Identification of key wildfire risks and risk drivers;
• Description of wildfire prevention, mitigation, and response strategies and
programs;
• Metrics for evaluating the performance of the plan and identifying areas for
improvement; and
• Review and validation of the plan.
2.3. City of Vernon
The City of Vernon is an industrial city
of 5.2 square miles located several
miles to the southeast of Downtown
Los Angeles in Southern California. The
City’s business-friendly environment,
low-cost utilities, and proximity to
ports, trucking and rail transport make
Vernon an ideal location for industrial
uses.
The City of Vernon is located in a
region of Los Angeles County with low
wildfire risk. No part of VPU’s service
territory is located in or near the High
Fire-Threat District, designed in the
California Public Utilities Commission’s
(CPUC) Fire Threat Map. Further, all of
VPU’s service territory is excluded from
the High, Very High, and Extreme
Threat areas of the California Department of Forestry and Fire Protection’s (CAL FIRE) Fire
and Resource Assessment Program (FRAP) Fire Threat Map. Based on a review of local
.
.
Item 7 Page 10 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 3
conditions and historical fires, the Vernon Fire Department has determined that VPU’s
electrical lines and equipment do not pose a significant risk of wildfire.
Despite this low risk, VPU takes appropriate actions to help its region prevent and
respond to the increasing risk of wildfires. In its role as a public agency, VPU closely
coordinates with other local safety and emergency officials to help protect against fires
and respond to emergencies. In its role as a utility, VPU follows all applicable design,
construction, operation, and maintenance requirements that reduce safety risks
associated with its system. This Wildfire Mitigation Plan describes the safety-related
measures that Vernon Public Utilities follows to reduce its risk of causing wildfires.
2.4. Vernon Public Utilities Profile
Formerly known as Vernon Light and Power and Vernon Gas & Electric, the City of Vernon
has consolidated all utility services within the VPU. VPU provides electric, water, natural
gas, and fiber optic services.
VPU serves about 2,000 mainly commercial and industrial electric customers with electric
sales of approximately 1,128 GWh annually, and peak loads of approximately 184 MW in
the summer and 174 MW in the winter.
2.5. Generation and Distribution Facilities
VPU’s electric system includes generation and distribution facilities that are completely
located within VPU’s electric service territory in the LA Basin. VPU does not own or
operate any transmission facilities. VPU has two generation facilities that are located
within VPU service territory. Malburg Generating Station (MGS), a 139 MW combined-
cycle natural gas-fired plant and two H. Gonzales units, a combined 10 MW natural gas
plant. VPU has 176 miles of distribution lines and 24 miles of 66 kV subtransmission lines.
No overhead distribution lines span over naturally vegetated open space areas.
Therefore, there is no potential for electrical equipment igniting a wildfire. The
generation and distribution facilities are located entirely within the CAISO balancing area
and are connected to the CAISO through the Southern California Edison (SCE) 220 -66 kV
Laguna Bell Substation. The Vernon load is supplied and supported by five 66 kV source
lines that exit the SCE Laguna Bell 220/66 kV Substation. With the support of Vernon’s
local generation, the VPU electric system reliability will most likely not be compromised
under a double contingency (N-2) situation, where two 66 kV transmission lines are out of
service.
2.6. Wildfire Risk Assessment
In 2018, Vernon Fire Department conducted a risk assessment of wildfires caused by
VPU’s overhead electrical lines and equipment, in compliance with Senate Bill 1028 (Hill,
2016). VPU provides electric service to the City of Vernon within the greater Los A ngeles .
.
Item 7 Page 11 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 4
basin. Specifically, VPU's service area is not within or near any wildland-urban interface
zones and more than ten miles from the nearest wildland-urban interface area. The
assessment includes information from the US Forest Service’s Fire Modeling Institute, and
the CAL FIRE Office of the State Fire Marshal. Also considered were Vernon’s historical
fire data, geographical location, and local conditions. Based on this information, the
determination was made that VPU’s electric equipment and operations do not pose a risk
of igniting a fire that could cause any significant wildfire condition.
3. Objectives
The primary objectives of this Wildfire Mitigation Plan are to:
1. Describe VPU’s existing programs, practices, and measures that effectively reduce
the probability that VPU’s electric supply system could be the origin or
contributing source for the ignition of a wildfire.
To support this goal, VPU regularly evaluates the prudent and cost -effective
improvements to its physical assets, operations, and training that can help reduce
the risk of equipment-related fires.
2. The secondary objective of this Wildfire Mitigation Plan is to improve the resiliency
of the electric grid. As part of the development of this plan, VPU assesses new
industry practices and technologies that will reduce the likelihood of an
interruption (frequency) in service and improve the restoration (duration) of
service.
3. Create a WMP that is consistent with state law and objectives.
4. Roles and Responsibilities
4.1. Wildfire Prevention
VPU staff that have responsibility for wildfire prevention are:
General Manager: Assumes overall responsibility for VPU’s planning and mitigation
activities, including maintaining compliance with state and federal safety and operating
requirements.
Assistant General Manager: Responsible for emergency preparedness, emergency
response, and coordinating recovery after a fire.
Utilities Operations Manager: Responsible for the reliable operation of VPU’s electric
distribution system and safety protocols, including the evaluation and installation of new
protective equipment to reduce fire risk. Maintain compliance with federal, state and
.
.
Item 7 Page 12 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 5
local fire management personnel to ensure that appropriate preventive measures are in
place.
Electric Operations Supervisor: Is primarily responsible for ensuring inspections of electric
lines, poles, and equipment, in addition to the performance of operations and
maintenance (O&M).
While other individuals, such as linemen, have the responsibility to inspect and report any
faulty operations of equipment, the primary responsibility for preventing electrical-
ignited fires and coordinating recovery is the Utilities Operations Manager and Assistant
General Manager.
4.2. Wildfire Response and Recovery
VPU is a member of the California Utility Emergency Association, which plays a key role in
ensuring communications between utilities and with California Office of Emergency
Services (CAL-OES) during emergencies. VPU also participates in the American Public
Power Association (APPA) Mutual Assistance Agreement, which is a mutual assistance
agreement covering municipal utilities across the United States.
4.3. Standardized Emergency Management System
As a local governmental agency,4 VPU has planning, communication, and coordination
obligations pursuant to the California Office of Emergency Services’ Standardized
Emergency Management System (SEMS) Regulations,5 adopted in accordance with
Government Code section 8607. The SEMS Regulations specify roles, responsibilities, and
structures of communications at five different levels: field response, local government,
operational area, regional, and state.6 Pursuant to this structure, VPU annually
coordinates and communicates with the relevant safety agencies as well as other relevant
4 As defined in Cal. Gov. Code § 8680.2.
5 19 CCR § 2407.
6 Cal. Gov. Code § 2403(b):
(1) “Field response level” commands emergency response personnel and resources to carry out tactical decisions and
activities in direct response to an incident or threat.
(2) “Local government level” manages and coordinates the overall emergency response and recovery activities within
their jurisdiction.
(3) “Operational area level” manages and/or coordinates information, resources, and priorities among local
governments within the operational area and serves as the coordination and communication link between the local
government level and the regional level.
(4) “Regional level” manages and coordinates information and resources among operational areas within the mutual aid
region designated pursuant to Government Code §8600 and between the operational areas and the state level. This
level along with the state level coordinates overall state agency support for emergency response activities.
(5) “State level” manages state resources in response to the emergency needs of the other levels, manages and
coordinates mutual aid among the mutual aid regions and between the regional level and state level, and serves as the
coordination and communication link with the federal disaster response system. .
.
Item 7 Page 13 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 6
local and state agencies. Pursuant to the SEMS structure, VPU participates in annual
training exercises with the Vernon Disaster Council. The Council meets quarterly to
discuss emergency management protocols, FEMA and SEMS procedures, and lessons
learned from disasters around the world. On an annual basis, the City’s Emergency
Operating Center is exercised by the Disaster Council as part of an Emergency Drill.
5. Wildfire Risks and Drivers
Pursuant to Public Utilities Code section 8387(b)(2), VPU has determined that it is not
necessary to describe Wildfire Risks and Drivers in this Wildfire Mitigation Plan because of
the unique characteristics of the service territory and operations of VPU, including lack of
wildfire fuel sources, and distance from any designated elevated fire-threat areas.
5.1. Design, Construction, Operation, and Maintenance
Due to the minimal risk of VPU’s electrical supply facilities igniting a wildfire, VPU is not
adopting wildfire specific protocols for Wildfire Risks and Drivers Associated with Design,
Construction, Operation, and Maintenance. However, VPU meets or exceeds the
minimum design and construction requirements provided in CPUC GO 95, which specifies
that electric supply systems shall be designed, constructed, and maintained for their
intended use with regard given to the conditions under which they are to be operated to
enable the furnishing of safe, proper, and adequate service.
5.2. Topographic and Climatological Risk Factors
Due to the minimal risk of VPU’s electrical supply facilities igniting a wildfire, VPU is not
adopting wildfire specific protocols for Wildfire Risks and Drivers Associated with
Topographic and Climatological Risk Factors.
6. Enterprise-wide Safety Risks
Pursuant to Public Utilities Code section 8387(b)(2), VPU has determined that it is not
necessary to describe Enterprise-wide Safety Risks in this Wildfire Mitigation Plan because
of the unique characteristics of the service territory and operations of VPU , including lack
of wildfire fuel sources, and distance from any designated elevated fire-threat areas.
.
.
Item 7 Page 14 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 7
7. Wildfire Preventative
Strategies
Pursuant to Public Utilities Code section 8387(b)(2), VPU has determined that it is not
necessary to describe Wildfire Preventative Strategies in this Wildfire Mitigation Plan
because of the unique characteristics of the service territory and operations of VPU,
including lack of wildfire fuel sources, and distance from any designated elevated fire-
threat areas.
High Fire-Threat District
In coordination with the California Municipal Utilities Association, VPU participated in the
development of the CPUC’s Fire-Threat Map,7 which defines a statewide High Fire-Threat
District (HFTD).
In the map development process, VPU reviewed the proposed boundaries of the High
Fire-Threat District and confirmed that, based on local conditions and historical fire data,
all of VPU’s service territory was properly excluded.
Design and Construction Standards
VPU’s electric facilities are designed and constructed to meet or exceed the relevant
federal, state, or industry standard. VPU treats CPUC General Orders (GO) 95 and 128 as
a key industry standard for design and construction standards for overhead and
underground electrical facilities. VPU meets or exceeds all standards in GO 95 and GO
128. Additionally, VPU monitors and follows, as appropriate, the National Electric Safety
Code.
8. Vegetation Management
Due to the industrial nature of the City of Vernon, there is very little risk of vegetation
igniting a wildfire, or impeding Vernon Public Utilities’ services. VPU’s service territory
neither contains nor is adjacent to any wildlands or elevate fire-threat areas and thus,
there is no risk of igniting wildfires.
8.1. City of Vernon Urban Forest is comprised of approximately 1,200 trees, which are
maintained and are pruned annually by a contracted Urban Forest Management
7 Adopted by CPUC Decision 17-12-024. .
.
Item 7 Page 15 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 8
Service company. Tree conditions are managed regularly in an asset management
system, and routine maintenance occurs on an annual basis.
8.2. Substations require bare ground for the safe operation of high voltage equipment.
Electric Operators monitor substations, switchyards, and other electric facilities on
a daily basis and remove invasive weeds and other vegetation as necessary. This
may be accomplished by pulling the vegetation, pruning, or spraying with an
herbicide such as glyphosate.
8.3. VPU meets or exceeds the minimum industry standard vegetation management
practices. For distribution level facilities, VPU meets: (1) Public Resources Code
section 4292; (2) Public Resources Code section 4293; (3) GO 95 Rule 35; and (4)
the GO 95 Appendix E Guidelines to Rule 35. These standards require significantly
increased clearances in the High Fire-Threat District. The recommended time-of-
trim guidelines do not establish a mandatory standard, but instead, provide useful
guidance to utilities.
GO 95, Rule 35, Table 1
Case Type of Clearance Trolley
Contact,
Feeder and
Span Wires,
0-5kv
Supply
Conductors
and Supply
Cables, 750 -
22,500 Volts
Supply
Conductors
and Supply
Cables, 22.5 -
300 kV
Supply
Conductors
and Supply
Cables, 300 -
550 kV (mm)
13 Radial clearance of
bare line conductors
from tree branches
or foliage
18 inches 18 inches ¼ Pin Spacing ½ Pin Spacing
14 Radial clearance of
bare line conductors
from vegetation in
the Fire-Threat
District
18 inches 48 inches 48 inches 120 inches
.
.
Item 7 Page 16 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 9
Appendix E
Guidelines to Rule 35
The radial clearances shown below are recommended minimum clearances that should be
established, at time of trimming, between the vegetation and the energized conductors and
associated live parts where practicable. Reasonable vegetation management practices may
make it advantageous for the purposes of public safety or service reliability to obtain greater
clearances than those listed below to ensure compliance until the next scheduled
maintenance. Each utility may determine and apply additional appropriate clearances
beyond clearances listed below, which take into consideration various factors, including: line
operating voltage, length of span, line sag, planned maintenance cycles, location of
vegetation within the span, species type, experience with particular species, vegetation
growth rate and characteristics, vegetation management standards and best practices, local
climate, elevation, fire risk, and vegetation trimming requirements that are applicable to
State Responsibility Area lands pursuant to Public Resource Code Sections 4102 and 4293.
Voltage of Lines Case 13 Case 14
Radial clearances for any conductor of a line
operating at 2,400 or more volts, but less than
72,000 volts
4 feet
12 feet
Radial clearances for any conductor of a line
operating at 72,000 or more volts, but less than
110,000 volts
6 feet
20 feet
Radial clearances for any conductor of a line
operating at 110,000 or more volts, but less
than 300,000 volts
10 feet
30 feet
Radial clearances for any conductor of a line
operating at 300,000 or more volts
15 feet
30 feet
9. Inspections
VPU meets or exceeds the minimum inspection requirements provided in CPUC GO 165
and CPUC GO 95, Rule 18. Pursuant to these rules, utilities inspect electric facilities in the
High Fire-Threat District more frequently than the other areas of its service territory. As
described above, VPU currently does not have any overhead powerlines located within, or
near the High Fire-Threat District within the CPUC’s Fire-Threat Map but still maintains
compliance with the inspection requirements as a best business practice. VPU performs
intrusive pole inspections and has a pole replacement priority and schedule program to
remove potential pole failure hazards, even though there is no significant native
vegetation below VPU’s overhead distribution lines.
VPU staff uses their knowledge of the specific environmental and geographical conditions
of VPU’s service territory to determine if any particular areas require more frequent
inspections. .
.
Item 7 Page 17 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 10
If VPU staff discovers a facility in need of repair that is owned by an entity other than
VPU, VPU will issue a notice of repair to the facility owner and work to ensure that
necessary repairs are completed promptly.
In accordance with CPUC GO165, VPU annually reports and publicly posts its inspection
data to its website under regulatory reports.8 Publicly posted information includes the
number of patrols, detailed overhead and underground inspections, and instrusive
inspections.
10. De-energization Protocols
10.1. Reclosing Policy
Due to the low wildfire threat in VPU’s service territory, VPU does not disable re-closers
due to anticipated wildfires. VPU does not have a formal procedure identified for
disabling re-closers. VPU will continue to assess the wildfire threat and will develop a
procedure as needed.
10.2. De-energization
Electrical outages can adversely affect electrical system equipment, customer production
and equipment, devices vital to public health and safety such as lighting, traffic signals,
wells and chlorinators and can cause disruption to critical communication n etworks.
Due to Vernon’s low wildfire risk profile, VPU is not adopting wildfire specific protocols for
de-energizing any portions of its electric distribution system. VPU will re-evaluate the
need to pre-emptively shut off power due to fire-threat conditions in future updates to
this Wildfire Mitigation Plan.
11. Customer Notification
Procedure
While VPU has a low risk of igniting a wildfire, VPU and its customers may be subject to a
wildfire threat to a major shared transmission line(s) that impacts the statewide grid or
parts of it- creating a resource shortage for the utilities that rely on the resources the
line(s) provides.
8 https://www.cityofvernon.org/government/public-utilities/regulatory-reports .
.
Item 7 Page 18 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 11
VPU proactively communicates to customers and key stakeholders through multiple
channels about preparing for potential curtailments, and the power restoration process.
VPU recognizes that many entities and individuals are particularly vulnerable during
extended power outages and makes every effort to provide up-to-date information to
these populations prior to, during, and after an event.
VPU’s Customer Service Center, Key Accounts staff, social media and CityofVernon.org
will provide ongoing and available resources for communication and education for the
overall customer base.
Key stakeholders, federal, state, and local elected officials, City and County executive staff
and first responders are also contacted via a variety of channels and personnel.
VPU has specific personnel assigned to elected officials and agencies, and to critical
customers including water and telecommunications utilities, potentially affected by an
outage to a major shared transmission line.
Any communications by VPU during an active emergency, such as wildfire, will be in
accordance with California’s Standardized Emergency Management System (SEMS) and
will be at the direction of the entity responsible for disseminating information about the
emergency.
12. Restoration of Service
Due to Vernon’s low wildfire risk profile, VPU is not adopting wildfire specific protocols for
restoration of service after de-energizing its electric distribution system.
General Steps to Restoration of Service are:
Patrol. VPU crews patrol the line to look for vegetation in lines and any obvious damage
that may prevent safe energization.
Repair. During patrol, crews look for potential damage to the lines and poles. Where
equipment damage is found, additional crews are dispatched with new materials to repair
or replace damaged equipment.
Test. Once the lines and poles are safe to operate, crews test the infrastructure by closing
the fuse or breaker to re-energize the line segment.
Restore. Power is restored, and the outage communication system provides notification
of power restoration to customers.
.
.
Item 7 Page 19 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 12
13. Evaluation Metrics
This section provides the metrics used to measure the performance of the Plan and
outlined programs.
13.1. Metrics and Assumptions for Measuring Plan
Performance
VPU will track three metrics to measure the performance of this Wildfire Mitigation Plan:
(1) number of fire ignitions; (2) wires down within the service territory; and (3) outage
caused by trees.
Metric 1: Fire Ignitions
For purposes of this metric, a Fire Ignition is defined as follows:
• VPU facility was associated with the fire;
• The fire was self-propagating and of a material other than electrical and/or
communication facilities;
• The resulting fire traveled greater than one linear meter from the ignition point; and
• VPU has knowledge that the fire occurred.
In future Wildfire Mitigation Plans, VPU will provide the number of Fire Ignitions that
occurred that were less than 5 acres in size. Any fires greater than 5 acres will be
individually described.
YEAR Number of Fire Ignitions
2019 0
2020 0
2021 0
2022 0
2023 0
2024 0
Metric 2: Wires Down
The second metric is the number of distribution wires downed within VPU’s service
territory. (VPU does not own or operate any transmission lines.) For purposes of this
metric, a Wires Down event includes any instance where an electric primary distribution
conductor falls to the ground, or on to a foreign object. As VPU does not own or operate
.
.
Item 7 Page 20 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 13
any transmission lines or own/operate distribution lines in the High Fire-Threat District,
reporting of Wires Down is limited to local distribution outside of the High Fire-Threat
District.
VPU will not normalize this metric by excluding unusual events, such as severe storms.
Instead, VPU will supplement this metric with a qualitative description of any such
unusual events.
YEAR Number of Wires Down
2019 0
2020 0
2021 0
2022 0
2023 0
2024 2
Metric 3: Outage Caused by Trees
The third metric is the number of distribution outages caused by trees within VPU’s
service territory. (VPU does not own or operate any transmission lines.) For purposes of
this metric, a tree-related outage event includes any instance where service on an electric
primary distribution circuit is interrupted by contact with a tree or vegetation. As VPU
does not own or operate any transmission lines or own/operate distribution lines in the
High Fire-Threat District, reporting of tree-related outages is limited to local distribution
outside of the High Fire-Threat District.
VPU will not normalize this metric by excluding unusual events, such as severe storms.
Instead, VPU will supplement this metric with a qualitative description of any such
unusual events.
YEAR Number of Tree Outages
2019 0
2020 0
2021 1
2022 0
2023 2
2024 0
.
.
Item 7 Page 21 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 14
14. Impact of Metrics on Plan
Due to VPU’s extremely-low risk wildfire circumstances, VPU anticipates that there will be
relatively limited data gathered through these metrics. However, as the data collection
history increases, VPU will be able to identify if any areas of its operations and service
territory are disproportionately impacted. VPU will then evaluate potential
improvements in future updates to this Plan including the use of additional metrics.
15. Monitoring and Auditing
the Plan
This Wildfire Mitigation Plan will be reviewed annually and will include an assessment of
the Plan programs and performance. Annual updates and triennial comprehensive
revisions shall be publicly presented and approved by minute order of the City Council
and adopted by resolution.
15.1. Identifying and Correcting Deficiencies in the Plan
At any point in time, when deficiencies are identified, the Utilities Operations Manager or
his/her delegates are responsible for correcting the deficiencies.
15.2. Monitoring the Effectiveness of Inspections
VPU’s Utilities Operations Manager will be responsible for monitoring and auditing the
targets specified in the Plan to confirm that the objectives of the Plan are met.
16. Independent Evaluator
Public Utilities Code section 8387(c) requires VPU to contract with a qualified
independent evaluator with experience in assessing the safe operation of electrical
infrastructure to review and assess the comprehensiveness of this Wildfire Mitigation
Plan. The independent evaluator must issue a report that is posted to the City of
Vernon’s website. This report must also be presented to the Vernon City Council at a
public meeting.
VPU participated in a public request for proposals, to identify the best qualified
independent evaluator to assess the comprehensiveness of VPU’s Wildfire Mitigation .
.
Item 7 Page 22 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 15
Plan. VPU contracted with Dudek & Associates, a qualified independent evaluator with
experience in assessing the safe operation of electrical infrastructure. Dudek’s
Independent Evaluation is attached in Appendix A of this Plan.
The independent evaluator’s report is posted to the City of Vernon’s website and has
been presented to Vernon’s City Council at a noticed public meeting.
17. Acronym Glossary
AB (Assembly Bill)
CAISO (California Independent System Operation)
CAL FIRE (California Department of Forestry and Fire Protection)
CPUC (California Public Utilities Commission)
CUEA (California Utilities Emergency Association)
ERM (Enterprise Risk Management)
FRAP (Fire Resource and Assessment Program)
GHG (Greenhouse gas)
GIS (Geographic Information System)
GO (General Order)
KV (Kilovolt)
KWH (Kilowatt Hours)
MW (Mega Watts)
O&M (Operations & Maintenance)
EOC (Emergency Operations Centers)
OES (Office of Emergency Services)
PUC (Public Utilities Code)
SB (Senate Bill)
SEMS (Standardized Emergency Management System)
SME (Subject Matter Expert)
T&D (Transmission and Distribution)
WMP (Wildfire Mitigation Plan)
.
.
Item 7 Page 23 of 35
VERNON WILDFIRE MITIGATION PLAN 2025 Page 16
Appendix A: Independent
Evaluation of Vernon Plan
.
.
Item 7 Page 24 of 35
May 31, 2023, 12255.06
Mrs. Lisa Umeda
Utilities Compliance Administrator
Vernon Public Utilities
City of Vernon
4305 Santa Fe Ave.
Vernon, CA 90058
Subject: Independent Evaluator’s Report of Vernon Public Utilities’ 2023 Wildfire Mitigation Plan
1 Introduction
Vernon Public Utilities (VPU) contracted with Dudek to engage in an independent evaluation of its 2023 Wildfire
Mitigation Plan (WMP). This independent evaluation report describes the technical review and evaluation of the
WMP prepared by the VPU. The WMP requirements are codified in California Public Utilities Code (PUC)
Section 8387(b)(2) for local publicly owned electric utilities (POUs). PUC Section 8387(c) requires that an
independent evaluator review and assess the comprehensiveness of a POU’s WMP and issue a summary report. The
year 2023 is important for POUs because they are required by PUC Section 8387(b)(1) to comprehensively revise their
WMPs “at least once every three years.”. The VPU’s last independent evaluator’s report was prepared for the review
of the VPU’s 2020 WMP.
Dudek conducted a review of VPU ’s 2023 WMP from May 17 to May 31, 2023. The focus of the evaluation was to
determine the comprehensiveness of WMP and ensure it included all elements required under PUC
Section 8387(b)(2).
In addition to evaluating the elements required by the PUC, Dudek reviewed the Wildfire Safety Advisory Board’s
(WSAB’s) specific guidance for the VPU published in their Guidance Advisory Opinion for the 2023 Wildfire Mitigation
Plans of Electric Publicly Owned Utilities and Rural Electrical Cooperatives (WSAB 2022).
This Independent Evaluator’s report contains the following elements: (1) an overview of the VPU , (2) A review of
the statutory requirements in PUC Section 8387(b)(2) for local POUs, (3) A review of the specific recommendations
published by the WSAB for the VPU 2022 WMP, (4) 2022 wildfire mitigation and prevention accomplishments of
the VPU , (5) an overview of the metrics used the VPU ’s WMP, and (6) a comparison of wildfire risk reduction
strategies used by the VPU with those used by similar utilities and municipal utility industry standards.
.
.
Item 7 Page 25 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
2 An Overview of Vernon Public Utilities
Vernon Public Utilities is a municipal utility provider that provides electric service to customers within the city limits
of Vernon. The VPU’s service territory covers 5.2 square miles and is located approximately 4 miles southeast of
downtown Los Angeles in the heavily urbanized east Los Angeles area. The City and the VPU’s entire service territory
is located in the relatively level Los Angeles basin and lacks any hills, canyons, or other topographic features. The
City and the VPU’s entire service territory is urban, mostly commercial, and industrial structures, with no areas of
natural vegetation or open space. The communities surrounding the VPU’s service territory are also composed of
urban, fully developed areas. Vegetation is sparse throughout the VPU’s service territory and is limited to islands of
landscaping or street trees widely separated by large areas of non-combustible pavement or development.
The VPU’s asset portfolio consists of distribution lines and generation equipment. The VPU’s lines are primarily
aboveground (%80) with some underground (%20). The VPU has 66kV sub-transmission lines but does not have
any transmission assets. Southern California Edison (SCE) has a transmission line that runs along the north side of
the service territory along the Los Angeles River/canal.
As described above, the City of Vernon and the VPU’s service territory including all facilities, equipment, and service
lines are in a highly urban area near downtown area Los Angeles and there is no natural vegetation or open space.
No portion of the VPU’s service territory lies within a high fire threat district nor does any area adjacent to the VPU’s
service territory lie within a high fire threat district. Since the city is fully urbanized there is insufficient vegetation
to sustain a wildfire and no portion of their service territory is classified as Wildland Urban Interface (WUI)( Radeloff,
V.C., 2022). No areas adjacent to the City limits are classified as WUI.
The VPU ’s service territory and the Los Angeles basin experiences a fire season that lasts from April to November
during a typical year. Early fall, September-October, are considered the most critical period due to the combination
of Santa Ana winds and low fuel moistures. While weather conditions in the Los Angeles area in the summer and
fall may be conducive to wildfire there is a very low risk that the city will experience a wildfire. This is evident in the
lack of a recorded wildfire in the VPU’s service territory and adjacent areas since CAL FIRE began recording fire data
in the early part of the 20th century. Given that the VPU’s service territory is entirely developed it is unlikely that
there will ever be increase in wildfire risk within their service territory.
.
.
Item 7 Page 26 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
3 Summary of Statutory Requirements for Wildfire
Mitigation Plans
PUC Section 8387(b)(2) lists the statutory requirements for WMPs. These are the specific elements that the
independent evaluator must review to make its determination for this report. The specific elements that must be
addressed in VPU ’s WMP are summarized here for reference.
▪ Staff responsibilities
▪ General objectives
▪ Wildfire risk reduction program descriptions
▪ The metrics used to evaluate the WMP’s performance.
▪ How the application of previously identified metrics has informed the WMP.
▪ Protocols for reclosers, de-energization, and public safety power shut-off.
▪ Procedures for community notification and outreach
▪ Vegetation management plans
▪ Electrical equipment and infrastructure inspection plans
▪ Description of wildfire risks and drivers for those risks throughout the service territory, including design,
construction, operation, and maintenance of equipment and facilities and topographic and climatological
risk factors
▪ Identification of any geographic area in the service territory that is a higher wildfire threat than is identified
in a commission fire threat map.
▪ Identification of enterprise-wide safety risk and wildfire-related risks
▪ How the service will be restored after a wildfire
▪ The processes and procedures used to monitor and audit the implementation of the WMP and identify any
deficiencies, and the effectiveness of electrical line and equipment inspections.
.
.
Item 7 Page 27 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
4 Review of the Comprehensiveness of the WMP in
Meeting Statutory Requirements
Dudek found that VPU ’s WMP meets the statutory requirements of comprehensiveness per PUC Section 8387. The
review of the WMP’s elements is summarized relative to the application of the WMP. Dudek’s assessment is in bold
text beneath the description of the requirement.
Minimizing Wildfire Risks
PUC Section 8387(a) requires the following: “Each local publicly owned electric utility and electrical cooperative
shall construct, maintain, and operate its electrical lines and equipment in a manner that will minimize the risk of
wildfire posed by those electrical lines and equipment.”
The VPU ’s WMP describes the safety-related measures and the regulatory standards that the VPU utilizes to reduce
the risk of its electrical equipment causing wildfires. Dudek has determined that VPU complies with this requirement
through the design of its system, its operations, and the implementation of wildfire risk reduction and wildfire
response strategies. Dudek also recognizes that the VPU is aware of the inherently low wildfire risk in their territory
and has selected wildfire prevention programs appropriate for their equipment and the conditions within their
service territory.
Evaluation of WMP Elements
Below is a summary of the WMP elements as required by PUC Section 8387, including restating sections of the
WMP where applicable.
8387(b)(2)(A): Responsibilities of Persons Responsible for Executing the Plan.
Section 4.1 of the VPU WMP comprehensively describes staff responsibilities and functions in the
implementation of their WMP including which staff positions are responsible for the wildfire prevention
programs described in the WMP.
8387(b)(2)(B): Objectives of the Wildfire Mitigation Plan
Section 3 of the VPU WMP describes the utility’s WMP three objectives. The objectives are brief but aptly
describe the objectives of the VPU’s WMP.
8387(b)(2)(C): Prevention Strategies and Programs
Section 7, 8, and 9 in the VPU’s WMP describe the wildfire prevention programs the VPU utilizes to
ensure wildfire risk remains low in their service territory.
8387(b)(2)(D): Metrics and Assumptions for Measuring WMP Performance
Section 13.1 contains a description of the metrics used by the WMP. The VPU tracks three metrics; fire
ignitions, wires down, and outages caused by trees.
.
.
Item 7 Page 28 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
8387(b)(2)(E): Impact of Previous Metrics on WMP
Section 14 provides a general statement about the impact of previous metrics on the current version the
WMP. Section 13 contains metric data collected since the 2020 version of the WMP. It is recommended
that part of this section be rewritten since the intent of the statutory requirement is to have the utility
state why the metrics in the WMP are useful for describing the effectiveness of the WMP and the
prevention strategies described within. The statement “Due to VPU’s extremely-low risk wildfire
circumstances, VPU anticipates that there will be relatively limited data gathered through
these metrics. However, as the data collection history increases, VPU will be able to identify if
any areas of its operations and service territory are disproportionately impacted.“ suggests that
these metrics are not useful for the WMP since the events these metrics are tracking are unlikely to
occur.
8387(b)(2)(F): Reclosing Protocols
Section 10.1 in the VPU’s WMP describes the utility’s reclosing policy. The VPU utilizes automatic
reclosing schemes and does not modify or disable automatic reclosing. Modifying or disabling reclosing
schemes is not necessary in the VPU’s service territory due to the lack of continuous vegetation near their
electrical equipment. An automatic reclosing scheme does not increase the risk that the VPU’s equipment
will start a wildfire.
8387(b)(2)(G): De-energization Notification Procedures
Section 10.2 in the VPU WMP states that the VPU does not have a wildfire specific notification protocol
due to the low risk of wildfire in their service territory. While not required (because the VPU does not have
a de-energization policy), I recommend briefly adding a description of how the VPU generally notifies
customers of outages or other utility related issues since the City does have a system in place i.e., the
City’s Emergency Alerts program.
8387(b)(2)(H): Vegetation Management
Section 8 of the VPU’s WMP describes the utility’s vegetation management program. The VPU uses the
states GO rules as its guidelines for treatment levels.
8387(b)(2)(I): Inspections
Section 9 of the VPU’s WMP describes the utility’s inspection program. The VPU uses the states GO rules
as its guidelines for inspection frequencies and type.
8387(b)(2)(J)(i): Risks and Risk Drivers Associated with Design and Construction Standards
Section 5.1 in the VPU’s WMP describes risk drivers related to design, construction, operation, and
maintenance. This section identifies that the VPU meets all regulatory requirements related to the design,
construction, operation, and maintenance of their electrical equipment. In addition, this section identifies
that the due to the conditions within their service territory the VPU does not have the risks/risk drivers
associated with design, construction, operation, and maintenance that are present in POU’s with service
territories that extend over open space or into remote areas.
.
.
Item 7 Page 29 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
8387(b)(2)(J)(ii): Risks and Risk Drivers Associated with Topographic and Climatological Risk Factors
Section 5.2 in the VPU’s WMP correctly identifies that the VPU’s service territory lacks the conditions to
sustain the spread of a wildfire and does not have any identifiable risks or risk drivers associated with
topography or climate.
8387(b (2)) (K): Geographical Area of Higher Wildfire Threat
Section 7 in the VPU states that the utility has examined the High Fire Threat District maps for the VPU
and sees no areas where it needs to be expanded.
8387(b)(2)(L): Enterprise-wide Safety Risks
Section 6 in the VPU’s WMP states “VPU has determined that it is not necessary to describe
Enterprise-wide Safety Risks in this Wildfire Mitigation Plan because of the unique
characteristics of the service territory and operations of VPU, including lack of wildfire fuel
sources, and distance from any designated elevated fire-threat areas.” While it is true that there is
very low risk of wildfire within their service territory, the VPU’s WMP should include a description of how
the VPU identifies utility wide risk or if the VPU uses the risk assessment process in the City’s LHMP.
8387(b)(2)(M): Restoration of Service
Section 12 of the VPU’s WMP describes the utility’s general process for restoring service.
8387(b)(2)(N)(i): Monitoring and Auditing WMP Implementation, 8387(b)(2)(N)(ii): Identifying and
correcting WMP deficiencies, 8387(b)(2)(N)(iii): Monitoring and Auditing the effectiveness of inspections.
Section 15 in the VPU’s WMP describes their monitoring and auditing programs for the WMP. Section
15.1 identifies the utilities process for identifying and correction deficiencies (on an as needed basis).
Section 15.2 states the Utilities Operations Manager evaluates inspection results and determines if the
inspection results confirm the inspection results are accurate and measure the effectiveness of the WMP.
5 Wildfire Safety Advisory Board Guidance
Advisory Opinions
In November 2022, the WSAB published a report with a description of general recommendations for improving the
WMPs for POUs and rural electrical cooperatives. At the end of the report the WSAB provided specific
recommendations for each utility that submitted a WMP for review by the board. Dudek reviewed the WSAB’s report,
and the section below contains a summary of each recommendation the WSAB had for the VPU ’s 2022 WMP and
whether the 2023 WMP has addressed the WSAB’s recommendation (WSAB 2022). The materials published by the
WSAB and the recommendations within are for guidance and are not statutory requirements.
In their 2021 WMP the VPU addressed or answered several general questions and recommendations made by the
WSAB for WMPs prepared by POUs. It is worth noting that in the WSAB’s 2022 guidance document that the WSAB
.
.
Item 7 Page 30 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
had only one VPU specific recommendation for a change to their WMP. The other two recommendations were
related to posting WMP material on the City’s website. The WSAB’s single recommendations for the VPU WMP is:
“The WSAB appreciates that Vernon provided tracking results information for their “number of ignitions” metric and
“wires down” metric for 2019-2021. The WSAB encourages Vernon to develop performance metrics that aim to
provide relevant information about how mitigation activities themselves are progressing (inspections accomplished
per goal, etc.).” (Wildfire Safety Advisory Board 2022).
For the 2023 the VPU added a third metric to the WMP, outages caused by trees. Outages caused by trees is an
outcome based metric but the addition of the new metric does provide more information to the VPU on the
effectiveness of their vegetation management program and presumably will provide useful information about
locations or specific tree/vegetation related issues that increase the risk of an outage. Dudek agrees with the WSAB
recommendation to consider changing the existing metrics or adding new performance based metrics WMP. It
would be more effective to track the accomplishments of the two main wildfire prevention strategies e mployed by
the VPU in their WMP (vegetation management and inspections).
.
.
Item 7 Page 31 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
6 Vernon Public Utilities 2022 Progress in Implementing
Wildfire Mitigation Plan Wildfire Prevention Strategies
This section describes the VPU’s accomplishments in 2022 for the wildfire prevention program and strategies
described in the WMP.
Vegetation Management
▪ Vegetation/Line Clearance Completed: 304 trees trimmed.
Inspections 1
• Overhead line visual patrols: 49.
• Overhead lines detailed inspections: 1000.
• Substation Inspections: 36
System Hardening
• Pole replacement program accomplishments: 107 poles replaced.
7 Wildfire Mitigation Plan Metric Overview
Metrics help POUs determine if their wildfire prevention strategies are effective for reducing the risk of a wildfire
ignited by their electrical equipment.
The VPU has adopted three metrics: Fire Ignitions and Wires Down were adopted in the first version of the WMP in
2020 and have been used in the subsequent versions of the WMP. For the 2023 the VPU adopted an additional
metric for their WMP, outages caused by trees. The VPU records the three metrics on an event occurrence basis.
For the metrics Fire Ignitions and Wires Down the VPU recorded the zero events from 2019 to 2021. For Outages
Caused By Trees, the VPU recorded one event in 2021 and zero events in 2019, 2020, and 2022.
These three metrics are appropriate given the type of assets the VPU has, and that most of their wires (80%) are
aboveground. However, because the VPU’s service territory has low wildfire risk performance based metrics would
be more useful to the VPU for understanding the effectiveness of their WMP and their wildfire prevention strategies.
It is recommended that the VPU replace the Fire Ignitions metric with one or two metrics that track the progress of
their wildfire prevention strategies such as the number of circuit miles visually inspected or trees trimmed annually.
As an alternative the Fire Ignitions can be kept but some additional Fire Ignition data should be collected to
complement the number of Fire Ignitions. For example, a comparison of the total number of fires the Los Angeles
1 The VPU posts inspection data on the City’s website from 2014 to 2022. .
.
Item 7 Page 32 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
County Fire Department responds to in the Vernon city limits to the number of fires attributable to the VPU’s
equipment.
8 Comparison of Industry Standards and Similar Utility
Wildfire Prevention Strategies
As part of this review of the VPU ’s 2023 WMP, Dudek compared the wildfire prevention strategies described in the
WMP to the strategies being implemented by POUs and accepted electrical industry practices for reducing wildfire
risk. While City of Vernon shares many similarities with its immediate in terms of wildfire risk (topography,
vegetation, and weather) its neighbors are served by SCE or Los Angeles Department of Water and Power, utilities
that are very different from the VPU. For this independent evaluator’s report Alameda Municipal Power (AMP) was
selected to compare the VPU’s WMP and wildfire prevention strategies to. The AMP is larger than the VPU in terms
of service territory size and number of customers, but they share a similar low wildfire risk exposure that comes
from being located in urban areas with no portion of their service territory in a high fire threat district , have a very
low risk of wildfire due to the lack of continuous flammable vegetation, and have adopted similar wildfire prevention
strategies.
8.1 Vegetation Management
Both utilities implement vegetation management programs that meet GO 95 requirements including tree trimming
around their poles and wires and surface vegetation management at their substations. Because they have no
overhead lines or equipment in the high fire threat district the VPU and AMP vegetation management programs are
primarily tree trimming programs.
8.2 System Hardening
Pole Replacement Program
The VPU has an ongoing on pole replacement priority and schedule program that replaces on average 106 aging
poles each year. The AMP’s WMP does not describe a dedicated pole replacement program, but the AMP replaces
pole on an as needed basis when the pole fails an inspection or intrusive testing.
8.3 Situational Awareness
Patrols and Visual In spec tions
Both utilities perform inspection cycles in accordance with GO 165. Problems that are identified during inspection
are prioritized for correction. Inspection findings are examined to identify trends and recurring problems. Routine
ground patrols and visual inspections of overhead lines and equipment are electrical industry standard practices
and particularly useful for these two utilities where equipment inspection and vegetation management are the main
wildfire prevention strategies.
.
.
Item 7 Page 33 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
9 Conclusion
The VPU has prepared a comprehensive WMP for 2023. The plan meets the statutory requirements described in
PUC Section 8387(b)(2) for a POU. In their most recent guidance document, The Wildfire Safety Advisory Board had
one recommended revision that applied to the VPU’s WMP which the VPU adopted by adding an additional metric.
The VPU ’s WMP describes a wildfire mitigation program that accurately assesses the risks and risk drivers present
in their service territory and is correct in identifying the low risk of wildfire present within the City limits.
Based on the information available in the WMP and information collected in the preparation of this report, the VPU
is aware of the wildfire risk present in its service territory, operates and maintains its electrical system in a safe and
efficient manner, and takes the necessary steps to reduce the risk that their equipment is the source of fire ignition.
Sincerely,
________________________________
Jeremy Cawn
Fire Protection Planner
.
.
Item 7 Page 34 of 35
TO: LISA UMEDA
SUBJECT: INDEPENDENT EVALUATOR’S REPORT OF VERNON PUBLIC UTILITIES 2023 WILDFIRE MITIGATION PLAN
10 References
Carlson, A.R., Helmers, D.P., Hawbaker, T.J., Mockrin, M.H., and Radeloff, V.C., 2022, Wildland-urban interface
maps for the conterminous U.S. based on 125 million building locations: U.S. Geological Survey data
release, https://doi.org/10.5066/P94BT6Q7.
CAL FIRE. (2022, October 1). Fire Perimeters through 2021. Retrieved from Fire and Resource Assessment
Program: https://frap.fire.ca.gov/mapping/gis-data/
WSAB (California Wildfire Safety Advisory Board). 2022. Guidance Advisory Opinion for the 2023 Wildfire
Mitigation Plans of Electric Publicly Owned Utilities and Rural Electric Cooperatives Draft. Office of Energy
Infrastructure Safety. October 17, 2022. Sacramento, California. Retrieved from: Wildfire Safety Advisory
Board | Office of Energy Infrastructure Safety (ca.gov)
.
.
Item 7 Page 35 of 35
0
CITY OF VERNON PUBLIC UTILITIES
4305 S SANTA FE AVE.
VERNON, CALIFORNIA 90058
Version: 65.0
Effective Date: 6/18/2024 7/1/2025
Wildfire
Mitigation
Plan
.
.
Item 7 Page 1 of 25
1
Contents
Executive Summary .................................................................................................................... i
Wildfire Safety Advisory Board Recommendations ............................................................. i
1. Executive Summary ........................................................................................................... 1
2. Introduction ....................................................................................................................... 1
2.1. Policy Statement ......................................................................................................... 2
2.2. Organization of the Wildfire Mitigation Plan ............................................................. 2
2.3. City of Vernon .............................................................................................................. 2
2.4. Vernon Public Utilities Profile ..................................................................................... 3
2.5. Generation and Distribution Facilities ........................................................................ 3
2.6. Wildfire Risk Assessment ............................................................................................ 3
3. Objectives .......................................................................................................................... 4
4. Roles and Responsibilities ................................................................................................ 4
4.1. Wildfire Prevention ..................................................................................................... 4
4.2. Wildfire Response and Recovery ................................................................................ 5
4.3. Standardized Emergency Management System ........................................................ 5
5. Wildfire Risks and Drivers ................................................................................................. 6
5.1. Design, Construction, Operation, and Maintenance ................................................. 6
5.2. Topographic and Climatological Risk Factors ............................................................ 6
6. Enterprise-wide Safety Risks ............................................................................................ 6
7. Wildfire Preventative Strategies ...................................................................................... 7
8. Vegetation Management .................................................................................................. 7
9. Inspections ........................................................................................................................ 9
10. De-energization Protocols .............................................................................................. 10
10.1. Reclosing Policy ......................................................................................................... 10
10.2. De-energization ......................................................................................................... 10
11. Customer Notification Procedure ............................................................................. 1111
12. Restoration of Service ..................................................................................................... 11
13. Evaluation Metrics ..................................................................................................... 1313
13.1. Metrics and Assumptions for Measuring Plan Performance ............................. 1313
14. Impact of Metrics on Plan ......................................................................................... 1515
15. Monitoring and Auditing the Plan ............................................................................. 1515 .
.
Item 7 Page 2 of 25
2
15.1. Identifying and Correcting Deficiencies in the Plan ............................................ 1515
15.2. Monitoring the Effectiveness of Inspections ...................................................... 1515
16. Independent Evaluator .............................................................................................. 1515
17. Acronym Glossary ...................................................................................................... 1616
APPENDIX
A. Independent Evaluation of Vernon Plan........................................................ 16
.
.
Item 7 Page 3 of 25
i
Reference Guide
Vernon Public Utilities (VPU) is dedicated to providing safe, reliable electric services to the
residents and businesses in City of Vernon at competitive prices.
While VPU’s service territory and operations do not include or abut high wildfire threat areas,
VPU remains committed to evaluating hazards that may affect the reliability and safety of the
City of Vernon. This WMP describes the activities that VPU is taking to mitigate the threat of
power-line ignited wildfires, including its various programs, policies and procedures. This plan
will be reviewed and evaluated by its City Council on an annual basis.
Utility Overview and Context
The California Wildfire Safety Advisory Board (WSAB) issued the Guidance Advisory Opinion for
the 2023 Wildfire Mitigation Plans of Electric Publicly Owned Utilities and Rural Electric
Cooperatives (“2023 WSAB Guidance Advisory Opinion”) on November 16, 2022. VPU provides
this document to the WSAB in order to respond to the recommendations included in the 2023
WSAB Guidance Advisory Opinion. VPU will provide a narrative response and/or a cross
reference to the location in VPU’s Wildfire Mitigation Plan (WMP) where the topic is addressed.
Where the recommendation is not applicable to VPU, the response will provide a brief
description supporting this conclusion.
Table 1: Context-Setting Information
Utility Name Vernon Public Utilities (VPU)
Service Territory Size 5.2 square miles
Owned Assets ☐ Transmission ☒Distribution ☒Generation
Number of Customers
Served
2,000 customer accounts
Population Within Service
Territory
150 222 people
Customer Class Makeup
Number of Accounts Share of Total Load (MWh)
4% Residential;
5% Government;
0% Agricultural;
64% Small/Medium Business,
Commercial;
26% Industrial
3% Residential;
5% Government;
0% Agricultural;
64% Small/Medium Business,
Commercial;
28% Industrial
Service Territory 0% Agriculture
0% Barren/Other .
.
Item 7 Page 4 of 25
ii
Location/Topography1 0% Conifer Forest
0% Conifer Woodland
0% Desert
0% Hardwood Forest
0% Hardwood Woodland
0% Herbaceous
0% Shrub
100% Urban
0% Water
Service Territory
Wildland Urban Interface2
(based on total area)
0% Wildland Urban Interface;
0% Wildland Urban Intermix;
Percent of Service
Territory in CPUC High Fire
Threat Districts (based on
total area)
Tier 2: 0%
Tier 3: 0%
Prevailing Wind Directions
& Speeds by Season
The windier part of the year lasts for 6 months, from November to May, with
average wind speeds of more than 6.9 miles per hour. The windiest day of the
year is December 31, with an average hourly wind speed of 8.6 miles per
hour.
The calmer time of year lasts for 6 months, from May to November. The
calmest day of the year is August 10, with an average hourly wind speed of
5.3 miles per hour.
The wind is most often from the west for 5 months, from February to July,
with a peak percentage of 47% on May 23. The wind is most often from the
north for 4 months, from October to February, with a peak percentage of 36%
on January 1.
Miles of Owned Lines
Underground and/or
Overhead
Overhead Dist.: 145 miles
Overhead Trans.: 0 miles
Underground Dist.: 31 miles
Underground Trans.: 0 miles
Explanatory Note 1 - Methodology for Measuring “Miles”: measured in line
miles
Percent of Owned Lines in
CPUC High Fire Threat
Districts
Overhead Distribution Lines as % of Total Distribution System
(Inside and Outside Service Territory)
Tier 2: 0%
Tier 3: 0%
Overhead Transmission Lines as % of Total Transmission System
(Inside and Outside Service Territory)
Tier 2: 0%
Tier 3: 0%
1 This data shall be based on the California Department of Forestry and Fire Protection, California Multi-Source
Vegetation Layer Map, depicting WHR13 Types (Wildlife Habitat Relationship classes grouped into 13 major land
cover types) available at: https://www.arcgis.com/home/item.html?id=b7ec5d68d8114b1fb2bfbf4665989eb3.
2 This data shall be based on the definitions and maps maintained by the United States Department of Agriculture ,
as most recently assembled in The 2010 Wildland-Urban Interface of the Conterminous United States, available at
https://www.fs.fed.us/nrs/pubs/rmap/rmap_nrs8.pdf. .
.
Item 7 Page 5 of 25
iii
Customers have ever lost
service due to an IOU PSPS
event?
☐ Yes ☒No
Customers have ever been
notified of a potential loss
of service to due to a
forecasted IOU PSPS
event?
☐ Yes ☒No
Has developed protocols
to pre-emptively shut off
electricity in response to
elevated wildfire risks?
☐ Yes ☒No
Has previously pre-
emptively shut off
electricity in response to
elevated wildfire risk?
☐ Yes ☒No
I. Cross Reference to Statutory requirements
WSAB requested that POUs provide a clear roadmap as to where each statutory
requirement is addressed within the POU WMP.
Table 2: Cross References to Statutory Requirements
Requirement Statutory Language Location in
WMP
Persons
Responsible
PUC § 8387(b)(2)(A): An accounting of the responsibilities of
persons responsible for executing the plan. Section 4
Objectives of
the Plan
PUC § 8387(b)(2)(B): The objectives of the wildfire mitigation
plan. Section 3
Preventive
Strategies
PUC § 8387(b)(2)(C): A description of the preventive strategies
and programs to be adopted by the local publicly owned
electric utility or electrical cooperative to minimize the risk of
its electrical lines and equipment causing catastrophic wildfires,
including consideration of dynamic climate change risks.
Section 7
Evaluation
Metrics
PUC § 8387(b)(2)(D): A description of the metrics the local
publicly owned electric utility or electrical cooperative plans
to use to evaluate the wildfire mitigation plan’s performance
and the assumptions that underlie the use of those metrics.
Section 13
Impact of
Metrics
PUC § 8387(b)(2)(E): A discussion of how the application of
previously identified metrics to previous wildfire mitigation
plan performances has informed the wildfire mitigation plan.
Section 14
Deenergization
Protocols
PUC § 8387(b)(2)(F): Protocols for disabling reclosers and
deenergizing portions of the electrical distribution system that
consider the associated impacts on public safety, as well as
protocols related to mitigating the public safety impacts of
Section 10
.
.
Item 7 Page 6 of 25
iv
those protocols, including impacts on critical first responders
and on health and communication infrastructure.
Customer
Notification
Procedures
PUC § 8387(b)(2)(G): Appropriate and feasible procedures for
notifying a customer who may be impacted by the
deenergizing of electrical lines. The procedures shall consider
the need to notify, as a priority, critical first responders, health
care facilities, and operators of telecommunications
infrastructure.
Section 11
Vegetation
Management
PUC § 8387(b)(2)(H): Plans for vegetation management. Section 8
Inspections
PUC § 8387(b)(2)(I): Plans for inspections of the local publicly
owned electric utility’s or electrical cooperative’s electrical
infrastructure.
Section 9
Prioritization of
Wildfire Risks
PUC § 8387(b)(2)(J): A list that identifies, describes, and
prioritizes all wildfire risks, and drivers for those risks,
throughout the local publicly owned electric utility’s or
electrical cooperative’s service territory. The list shall include,
but not be limited to, both of the following:
(i) Risks and risk drivers associated with design, construction,
operation, and maintenance of the local publicly owned electric
utility’s or electrical cooperative’s equipment and facilities.
(ii) Particular risks and risk drivers associated with topographic
and climatological risk factors throughout the different parts of
the local publicly owned electric utility’s or electrical
cooperative’s service territory.
Section 5
CPUC Fire
Threat Map
Adjustments
PUC § 8387(b)(2)(K): Identification of any geographic area in
the local publicly owned electric utility’s or electrical
cooperative’s service territory that is a higher wildfire threat
than is identified in a commission fire threat map, and
identification of where the commission should expand a high
fire threat district based on new information or changes to the
environment.
Section 2.3
Section 2.6
Enterprisewide
Risks
PUC § 8387(b)(2)(L): A methodology for identifying and
presenting enterprisewide safety risk and wildfire-related risk. Section 6
Restoration of
Service
PUC § 8387(b)(2)(M): A statement of how the local publicly
owned electric utility or electrical cooperative will restore
service after a wildfire.
Section 12
Monitor and
Audit
PUC § 8387(b)(2)(N): A description of the processes and
procedures the local publicly owned electric utility or electrical
cooperative shall use to do all of the following
(i) Monitor and audit the implementation of the wildfire
mitigation plan.
(ii) Identify any deficiencies in the wildfire mitigation plan
or its implementation, and correct those deficiencies.
Section 15
.
.
Item 7 Page 7 of 25
v
(iii) Monitor and audit the effectiveness of electrical line
and equipment inspections, including inspections
performed by contractors, that are carried out under the
plan, other applicable statutes, or commission rules.
Qualified
Independent
Evaluator
PUC § 8387(c): The local publicly owned electric utility or
electrical cooperative shall contract with a qualified
independent evaluator with experience in assessing the safe
operation of electrical infrastructure to review and assess the
comprehensiveness of its wildfire mitigation plan. The
independent evaluator shall issue a report that shall be made
available on the Internet Web site of the local publicly owned
electric utility or electrical cooperative, and shall present the
report at a public meeting of the local publicly owned electric
utility’s or electrical cooperative’s governing board.
Section 16
II. WSAB Guidance Advisory Opinion Recommendations
Process for Utility Adoption and Submittal of Annual WMP and Opportunities for Public
Comment:
VPU is governed by the Vernon City Council. Accordingly, the 2021 Vernon Public Utilities
Wildfire Mitigation Plan was presented to the Vernon City Council on May 18, 2021, and was
adopted in Resolution No. 2021-12. Subsequent annual updates and triennial comprehensive
revisions shall be publicly presented and approved by minute order of the City Council.
Description of Where WMP Information Can be Found on Utility Website
The Vernon Public Utilities Wildfire Mitigation Plan and the independent evaluator’s report will
be posted to the City of Vernon’s website under regulatory reports3 and has been presented to
Vernon’s City Council at a noticed public meeting.
3 https://www.cityofvernon.org/government/public-utilities/regulatory-reports
.
.
Item 7 Page 8 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 1
1. Executive Summary
1.1. The Vernon Public Utilities Wildfire Mitigation Plan meets applicable California
Senate Bill 901, Assembly Bill 1054, and Assembly Bill 111 requirements.
1.2. The City of Vernon is an industrial city of 5.2 square miles, adjacent to Downtown
Los Angeles. Wildfire ignition risks are low due to the sparsity of vegetation and
fuel sources in Vernon’s industrial environment.
1.3. Vernon is located more than 10 miles from the nearest California Public Utilities
Commission (CPUC) High Fire-Threat District Elevated risk area.
1.4. Vernon Public Utilities (VPU) does not own or operate transmission, distribution,
or generation facilities in CPUC High Fire-Threat District.
1.5. VPU does not own or operate transmission, distribution, or generation facilities in
California Department of Forestry and Fire Protection’s (CAL FIRE) Fire and
Resource Assessment Program (FRAP) Fire Threat Map’s designated High or
Extreme Wildfire Hazard areas.
1.6. VPU’s Wildfire Mitigation Plan includes required program components such as
performance metrics, continuous improvement, and responsible parties.
1.7. VPU will make annual Wildfire Mitigation Plan progress updates to the Vernon
City Council and the California Wildfire Safety Advisory Board.
2. Introduction
Over the last few years, California has seen some of its most devastating and destructive
wildfires. Climate Change is recognized as a contributing factor (long hot spells, low
moisture, etc.). In response, Senate Bill (SB) 901 authored by Senator Dodd, was enacted
in 2018. SB 901 requires every electric utility to prepare a wildfire mitigation plan (WMP)
and annually present the plan to its governing body. SB 901 amended Public Utilities Code
(PUC) section 8387. Section 8387 generally requires every publicly owned utility to
construct, maintain, and operate its electrical facilities to minimize the risk of wildfire
posed by those facilities. As further required by Assembly Bill (AB) 1054 enacted in 2019,
the WMP shall be submitted to the California Wildfire Safety Advisory Board for review
and advisory opinion annually by July 1. At least once every three years, the submittal
must be a comprehensive revision of the WMP.
This document outlines Vernon Public Utilities’ activities in accordance with these
requirements.
.
.
Item 7 Page 9 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 2
2.1. Policy Statement
Vernon Public Utilities' overarching goal is to provide safe, reliable, and economic electric
service to its local community. In order to meet this goal, VPU constructs, maintains, and
operates its electrical lines and equipment in a manner that minimizes the risk of
catastrophic wildfire posed by its electrical lines and equipment.
2.2. Organization of the Wildfire Mitigation Plan
This Wildfire Mitigation Plan includes the following elements:
• Objectives of the plan;
• Roles and responsibilities for carrying out the plan;
• Identification of key wildfire risks and risk drivers;
• Description of wildfire prevention, mitigation, and response strategies and
programs;
• Metrics for evaluating the performance of the plan and identifying areas for
improvement; and
• Review and validation of the plan.
2.3. City of Vernon
The City of Vernon is an industrial city
of 5.2 square miles located several
miles to the southeast of Downtown
Los Angeles in Southern California. The
City’s business-friendly environment,
low-cost utilities, and proximity to
ports, trucking and rail transport make
Vernon an ideal location for industrial
uses.
The City of Vernon is located in a
region of Los Angeles County with low
wildfire risk. No part of VPU’s service
territory is located in or near the High
Fire-Threat District, designed in the
California Public Utilities Commission’s
(CPUC) Fire Threat Map. Further, all of
VPU’s service territory is excluded from
the High, Very High, and Extreme
Threat areas of the California Department of Forestry and Fire Protection’s (CAL FIRE) Fire
and Resource Assessment Program (FRAP) Fire Threat Map. Based on a review of local
.
.
Item 7 Page 10 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 3
conditions and historical fires, the Vernon Fire Department has determined that VPU’s
electrical lines and equipment do not pose a significant risk of wildfire.
Despite this low risk, VPU takes appropriate actions to help its region prevent and
respond to the increasing risk of wildfires. In its role as a public agency, VPU closely
coordinates with other local safety and emergency officials to help protect against fires
and respond to emergencies. In its role as a utility, VPU follows all applicable design,
construction, operation, and maintenance requirements that reduce safety risks
associated with its system. This Wildfire Mitigation Plan describes the safety-related
measures that Vernon Public Utilities follows to reduce its risk of causing wildfires.
2.4. Vernon Public Utilities Profile
Formerly known as Vernon Light and Power and Vernon Gas & Electric, the City of Vernon
has consolidated all utility services within the VPU. VPU provides electric, water, natural
gas, and fiber optic services.
VPU serves about 2,000 mainly commercial and industrial electric customers with electric
sales of approximately 1,128 GWh annually, and peak loads of approximately 184 MW in
the summer and 174 MW in the winter.
2.5. Generation and Distribution Facilities
VPU’s electric system includes generation and distribution facilities that are completely
located within VPU’s electric service territory in the LA Basin. VPU does not own or
operate any transmission facilities. VPU has two generation facilities that are located
within VPU service territory. Malburg Generating Station (MGS), a 139 MW combined-
cycle natural gas-fired plant and two H. Gonzales units, a combined 10 MW natural gas
plant. VPU has 176 miles of distribution lines and 24 miles of 66 kV subtransmission lines.
No overhead distribution lines span over naturally vegetated open space areas.
Therefore, there is no potential for electrical equipment igniting a wildfire. The
generation and distribution facilities are located entirely within the CAISO balancing area
and are connected to the CAISO through the Southern California Edison (SCE) 220 -66 kV
Laguna Bell Substation. The Vernon load is supplied and supported by five 66 kV source
lines that exit the SCE Laguna Bell 220/66 kV Substation. With the support of Vernon’s
local generation, the VPU electric system reliability will most likely not be compromised
under a double contingency (N-2) situation, where two 66 kV transmission lines are out of
service.
2.6. Wildfire Risk Assessment
In 2018, Vernon Fire Department conducted a risk assessment of wildfires caused by
VPU’s overhead electrical lines and equipment, in compliance with Senate Bill 1028 (Hill,
2016). VPU provides electric service to the City of Vernon within the greater Los A ngeles .
.
Item 7 Page 11 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 4
basin. Specifically, VPU's service area is not within or near any wildland-urban interface
zones and more than ten miles from the nearest wildland-urban interface area. The
assessment includes information from the US Forest Service’s Fire Modeling Institute, and
the CAL FIRE Office of the State Fire Marshal. Also considered were Vernon’s historical
fire data, geographical location, and local conditions. Based on this information, the
determination was made that VPU’s electric equipment and operations do not pose a risk
of igniting a fire that could cause any significant wildfire condition.
3. Objectives
The primary objectives of this Wildfire Mitigation Plan are to:
1. Describe VPU’s existing programs, practices, and measures that effectively reduce
the probability that VPU’s electric supply system could be the origin or
contributing source for the ignition of a wildfire.
To support this goal, VPU regularly evaluates the prudent and cost -effective
improvements to its physical assets, operations, and training that can help reduce
the risk of equipment-related fires.
2. The secondary objective of this Wildfire Mitigation Plan is to improve the resiliency
of the electric grid. As part of the development of this plan, VPU assesses new
industry practices and technologies that will reduce the likelihood of an
interruption (frequency) in service and improve the restoration (duration) of
service.
3. Create a WMP that is consistent with state law and objectives.
4. Roles and Responsibilities
4.1. Wildfire Prevention
VPU staff that have responsibility for wildfire prevention are:
General Manager: Assumes overall responsibility for VPU’s planning and mitigation
activities, including maintaining compliance with state and federal safety and operating
requirements.
Assistant General Manager: Responsible for emergency preparedness, emergency
response, and coordinating recovery after a fire.
Utilities Operations Manager: Responsible for the reliable operation of VPU’s electric
distribution system and safety protocols, including the evaluation and installation of new
protective equipment to reduce fire risk. Maintain compliance with federal, state and
.
.
Item 7 Page 12 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 5
local fire management personnel to ensure that appropriate preventive measures are in
place.
Electric Operations Supervisor: Is primarily responsible for ensuring inspections of electric
lines, poles, and equipment, in addition to the performance of operations and
maintenance (O&M).
While other individuals, such as linemen, have the responsibility to inspect and report any
faulty operations of equipment, the primary responsibility for preventing electrical-
ignited fires and coordinating recovery is the Utilities Operations Manager and Assistant
General Manager.
4.2. Wildfire Response and Recovery
VPU is a member of the California Utility Emergency Association, which plays a key role in
ensuring communications between utilities and with California Office of Emergency
Services (CAL-OES) during emergencies. VPU also participates in the American Public
Power Association (APPA) Mutual Assistance Agreement, which is a mutual assistance
agreement covering municipal utilities across the United States.
4.3. Standardized Emergency Management System
As a local governmental agency,4 VPU has planning, communication, and coordination
obligations pursuant to the California Office of Emergency Services’ Standardized
Emergency Management System (SEMS) Regulations,5 adopted in accordance with
Government Code section 8607. The SEMS Regulations specify roles, responsibilities, and
structures of communications at five different levels: field response, local government,
operational area, regional, and state.6 Pursuant to this structure, VPU annually
coordinates and communicates with the relevant safety agencies as well as other relevant
4 As defined in Cal. Gov. Code § 8680.2.
5 19 CCR § 2407.
6 Cal. Gov. Code § 2403(b):
(1) “Field response level” commands emergency response personnel and resources to carry out tactical decisions and
activities in direct response to an incident or threat.
(2) “Local government level” manages and coordinates the overall emergency response and recovery activities within
their jurisdiction.
(3) “Operational area level” manages and/or coordinates information, resources, and priorities among local
governments within the operational area and serves as the coordination and communication link between the local
government level and the regional level.
(4) “Regional level” manages and coordinates information and resources among operational areas within the mutual aid
region designated pursuant to Government Code §8600 and between the operational areas and the state level. This
level along with the state level coordinates overall state agency support for emergency response activities.
(5) “State level” manages state resources in response to the emergency needs of the other levels, manages and
coordinates mutual aid among the mutual aid regions and between the regional level and state level, and serves as the
coordination and communication link with the federal disaster response system. .
.
Item 7 Page 13 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 6
local and state agencies. Pursuant to the SEMS structure, VPU participates in annual
training exercises with the Vernon Disaster Council. The Council meets quarterly to
discuss emergency management protocols, FEMA and SEMS procedures, and lessons
learned from disasters around the world. On an annual basis, the City’s Emergency
Operating Center is exercised by the Disaster Council as part of an Emergency Drill.
5. Wildfire Risks and Drivers
Pursuant to Public Utilities Code section 8387(b)(2), VPU has determined that it is not
necessary to describe Wildfire Risks and Drivers in this Wildfire Mitigation Plan because of
the unique characteristics of the service territory and operations of VPU, including lack of
wildfire fuel sources, and distance from any designated elevated fire-threat areas.
5.1. Design, Construction, Operation, and Maintenance
Due to the minimal risk of VPU’s electrical supply facilities igniting a wildfire, VPU is not
adopting wildfire specific protocols for Wildfire Risks and Drivers Associated with Design,
Construction, Operation, and Maintenance. However, VPU meets or exceeds the
minimum design and construction requirements provided in CPUC GO 95, which specifies
that electric supply systems shall be designed, constructed, and maintained for their
intended use with regard given to the conditions under which they are to be operated to
enable the furnishing of safe, proper, and adequate service.
5.2. Topographic and Climatological Risk Factors
Due to the minimal risk of VPU’s electrical supply facilities igniting a wildfire, VPU is not
adopting wildfire specific protocols for Wildfire Risks and Drivers Associated with
Topographic and Climatological Risk Factors.
6. Enterprise-wide Safety Risks
Pursuant to Public Utilities Code section 8387(b)(2), VPU has determined that it is not
necessary to describe Enterprise-wide Safety Risks in this Wildfire Mitigation Plan because
of the unique characteristics of the service territory and operations of VPU , including lack
of wildfire fuel sources, and distance from any designated elevated fire-threat areas.
.
.
Item 7 Page 14 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 7
7. Wildfire Preventative
Strategies
Pursuant to Public Utilities Code section 8387(b)(2), VPU has determined that it is not
necessary to describe Wildfire Preventative Strategies in this Wildfire Mitigation Plan
because of the unique characteristics of the service territory and operations of VPU,
including lack of wildfire fuel sources, and distance from any designated elevated fire-
threat areas.
High Fire-Threat District
In coordination with the California Municipal Utilities Association, VPU participated in the
development of the CPUC’s Fire-Threat Map,7 which defines a statewide High Fire-Threat
District (HFTD).
In the map development process, VPU reviewed the proposed boundaries of the High
Fire-Threat District and confirmed that, based on local conditions and historical fire data,
all of VPU’s service territory was properly excluded.
Design and Construction Standards
VPU’s electric facilities are designed and constructed to meet or exceed the relevant
federal, state, or industry standard. VPU treats CPUC General Orders (GO) 95 and 128 as
a key industry standard for design and construction standards for overhead and
underground electrical facilities. VPU meets or exceeds all standards in GO 95 and GO
128. Additionally, VPU monitors and follows, as appropriate, the National Electric Safety
Code.
8. Vegetation Management
Due to the industrial nature of the City of Vernon, there is very little risk of vegetation
igniting a wildfire, or impeding Vernon Public Utilities’ services. VPU’s service territory
neither contains nor is adjacent to any wildlands or elevate fire-threat areas and thus,
there is no risk of igniting wildfires.
8.1. City of Vernon Urban Forest is comprised of approximately 1,200 trees, which are
maintained and are pruned annually by a contracted Urban Forest Management
7 Adopted by CPUC Decision 17-12-024. .
.
Item 7 Page 15 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 8
Service company. Tree conditions are managed regularly in an asset management
system, and routine maintenance occurs on an annual basis.
8.2. Substations require bare ground for the safe operation of high voltage equipment.
Electric Operators monitor substations, switchyards, and other electric facilities on
a daily basis and remove invasive weeds and other vegetation as necessary. This
may be accomplished by pulling the vegetation, pruning, or spraying with an
herbicide such as glyphosate.
8.3. VPU meets or exceeds the minimum industry standard vegetation management
practices. For distribution level facilities, VPU meets: (1) Public Resources Code
section 4292; (2) Public Resources Code section 4293; (3) GO 95 Rule 35; and (4)
the GO 95 Appendix E Guidelines to Rule 35. These standards require significantly
increased clearances in the High Fire-Threat District. The recommended time-of-
trim guidelines do not establish a mandatory standard, but instead, provide useful
guidance to utilities.
GO 95, Rule 35, Table 1
Case Type of Clearance Trolley
Contact,
Feeder and
Span Wires,
0-5kv
Supply
Conductors
and Supply
Cables, 750 -
22,500 Volts
Supply
Conductors
and Supply
Cables, 22.5 -
300 kV
Supply
Conductors
and Supply
Cables, 300 -
550 kV (mm)
13 Radial clearance of
bare line conductors
from tree branches
or foliage
18 inches 18 inches ¼ Pin Spacing ½ Pin Spacing
14 Radial clearance of
bare line conductors
from vegetation in
the Fire-Threat
District
18 inches 48 inches 48 inches 120 inches
.
.
Item 7 Page 16 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 9
Appendix E
Guidelines to Rule 35
The radial clearances shown below are recommended minimum clearances that should be
established, at time of trimming, between the vegetation and the energized conductors and
associated live parts where practicable. Reasonable vegetation management practices may
make it advantageous for the purposes of public safety or service reliability to obtain greater
clearances than those listed below to ensure compliance until the next scheduled
maintenance. Each utility may determine and apply additional appropriate clearances
beyond clearances listed below, which take into consideration various factors, including: line
operating voltage, length of span, line sag, planned maintenance cycles, location of
vegetation within the span, species type, experience with particular species, vegetation
growth rate and characteristics, vegetation management standards and best practices, local
climate, elevation, fire risk, and vegetation trimming requirements that are applicable to
State Responsibility Area lands pursuant to Public Resource Code Sections 4102 and 4293.
Voltage of Lines Case 13 Case 14
Radial clearances for any conductor of a line
operating at 2,400 or more volts, but less than
72,000 volts
4 feet
12 feet
Radial clearances for any conductor of a line
operating at 72,000 or more volts, but less than
110,000 volts
6 feet
20 feet
Radial clearances for any conductor of a line
operating at 110,000 or more volts, but less
than 300,000 volts
10 feet
30 feet
Radial clearances for any conductor of a line
operating at 300,000 or more volts
15 feet
30 feet
9. Inspections
VPU meets or exceeds the minimum inspection requirements provided in CPUC GO 165
and CPUC GO 95, Rule 18. Pursuant to these rules, utilities inspect electric facilities in the
High Fire-Threat District more frequently than the other areas of its service territory. As
described above, VPU currently does not have any overhead powerlines located within, or
near the High Fire-Threat District within the CPUC’s Fire-Threat Map but still maintains
compliance with the inspection requirements as a best business practice. VPU performs
intrusive pole inspections and has a pole replacement priority and schedule program to
remove potential pole failure hazards, even though there is no significant native
vegetation below VPU’s overhead distribution lines.
.
.
Item 7 Page 17 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 10
VPU staff uses their knowledge of the specific environmental and geographical conditions
of VPU’s service territory to determine if any particular areas require more frequent
inspections.
If VPU staff discovers a facility in need of repair that is owned by an entity other than
VPU, VPU will issue a notice of repair to the facility owner and work to ensure that
necessary repairs are completed promptly.
In accordance with CPUC GO165, VPU annually reports and publicly posts its inspection
data to its website under regulatory reports.8 Publicly posted information includes the
number of patrols, detailed overhead and underground inspections, and instrusive
inspections.
10. De-energization Protocols
10.1. Reclosing Policy
Due to the low wildfire threat in VPU’s service territory, VPU does not disable re-closers
due to anticipated wildfires. VPU does not have a formal procedure identified for
disabling re-closers. VPU will continue to assess the wildfire threat and will develop a
procedure as needed.
10.2. De-energization
Electrical outages can adversely affect electrical system equipment, customer production
and equipment, devices vital to public health and safety such as lighting, traffic signals,
wells and chlorinators and can cause disruption to critical communication n etworks.
Due to Vernon’s low wildfire risk profile, VPU is not adopting wildfire specific protocols for
de-energizing any portions of its electric distribution system. VPU will re-evaluate the
need to pre-emptively shut off power due to fire-threat conditions in future updates to
this Wildfire Mitigation Plan.
8 https://www.cityofvernon.org/government/public-utilities/regulatory-reports .
.
Item 7 Page 18 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 11
11. Customer Notification
Procedure
While VPU has a low risk of igniting a wildfire, VPU and its customers may be subject to a
wildfire threat to a major shared transmission line(s) that impacts the statewide grid or
parts of it- creating a resource shortage for the utilities that rely on the resources the
line(s) provides.
VPU proactively communicates to customers and key stakeholders through multiple
channels about preparing for potential curtailments, and the power restoration process.
VPU recognizes that many entities and individuals are particularly vulnerable during
extended power outages and makes every effort to provide up-to-date information to
these populations prior to, during, and after an event.
VPU’s Customer Service Center, Key Accounts staff, social media and CityofVernon.org
will provide ongoing and available resources for communication and education for the
overall customer base.
Key stakeholders, federal, state, and local elected officials, City and County executive staff
and first responders are also contacted via a variety of channels and personnel.
VPU has specific personnel assigned to elected officials and agencies, and to critical
customers including water and telecommunications utilities, potentially affected by an
outage to a major shared transmission line.
Any communications by VPU during an active emergency, such as wildfire, will be in
accordance with California’s Standardized Emergency Management System (SEMS) and
will be at the direction of the entity responsible for disseminating information about the
emergency.
12. Restoration of Service
Due to Vernon’s low wildfire risk profile, VPU is not adopting wildfire specific protocols for
restoration of service after de-energizing its electric distribution system.
General Steps to Restoration of Service are:
Patrol. VPU crews patrol the line to look for vegetation in lines and any obvious damage
that may prevent safe energization.
.
.
Item 7 Page 19 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 12
Repair. During patrol, crews look for potential damage to the lines and poles. Where
equipment damage is found, additional crews are dispatched with new materials to repair
or replace damaged equipment.
Test. Once the lines and poles are safe to operate, crews test the infrastructure by closing
the fuse or breaker to re-energize the line segment.
Restore. Power is restored, and the outage communication system provides notification
of power restoration to customers.
.
.
Item 7 Page 20 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 13
13. Evaluation Metrics
This section provides the metrics used to measure the performance of the Plan and
outlined programs.
13.1. Metrics and Assumptions for Measuring Plan
Performance
VPU will track three metrics to measure the performance of this Wildfire Mitigation Plan:
(1) number of fire ignitions; (2) wires down within the service territory; and (3) outage
caused by trees.
Metric 1: Fire Ignitions
For purposes of this metric, a Fire Ignition is defined as follows:
• VPU facility was associated with the fire;
• The fire was self-propagating and of a material other than electrical and/or
communication facilities;
• The resulting fire traveled greater than one linear meter from the ignition point; and
• VPU has knowledge that the fire occurred.
In future Wildfire Mitigation Plans, VPU will provide the number of Fire Ignitions that
occurred that were less than 5 acres in size. Any fires greater than 5 acres will be
individually described.
YEAR Number of Fire Ignitions
2019 0
2020 0
2021 0
2022 0
2023 0
2024 0
Metric 2: Wires Down
The second metric is the number of distribution wires downed within VPU’s service
territory. (VPU does not own or operate any transmission lines.) For purposes of this
metric, a Wires Down event includes any instance where an electric primary distribution
conductor falls to the ground, or on to a foreign object. As VPU does not own or operate
.
.
Item 7 Page 21 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 14
any transmission lines or own/operate distribution lines in the High Fire-Threat District,
reporting of Wires Down is limited to local distribution outside of the High Fire-Threat
District.
VPU will not normalize this metric by excluding unusual events, such as severe storms.
Instead, VPU will supplement this metric with a qualitative description of any such
unusual events.
YEAR Number of Wires Down
2019 0
2020 0
2021 0
2022 0
2023 0
2024 2
Metric 3: Outage Caused by Trees
The third metric is the number of distribution outages caused by trees within VPU’s
service territory. (VPU does not own or operate any transmission lines.) For purposes of
this metric, a tree-related outage event includes any instance where service on an electric
primary distribution circuit is interrupted by contact with a tree or vegetation. As VPU
does not own or operate any transmission lines or own/operate distribution lines in the
High Fire-Threat District, reporting of tree-related outages is limited to local distribution
outside of the High Fire-Threat District.
VPU will not normalize this metric by excluding unusual events, such as severe storms.
Instead, VPU will supplement this metric with a qualitative description of any such
unusual events.
YEAR Number of Tree Outages
2019 0
2020 0
2021 1
2022 0
2023 2
2024 0
.
.
Item 7 Page 22 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 15
14. Impact of Metrics on Plan
Due to VPU’s extremely-low risk wildfire circumstances, VPU anticipates that there will be
relatively limited data gathered through these metrics. However, as the data collection
history increases, VPU will be able to identify if any areas of its operations and service
territory are disproportionately impacted. VPU will then evaluate potential
improvements in future updates to this Plan including the use of additional metrics.
15. Monitoring and Auditing
the Plan
This Wildfire Mitigation Plan will be reviewed annually and will include an assessment of
the Plan programs and performance. Annual updates and triennial comprehensive
revisions shall be publicly presented and approved by minute order of the City Council
and adopted by resolution.
15.1. Identifying and Correcting Deficiencies in the Plan
At any point in time, when deficiencies are identified, the Utilities Operations Manager or
his/her delegates are responsible for correcting the deficiencies.
15.2. Monitoring the Effectiveness of Inspections
VPU’s Utilities Operations Manager will be responsible for monitoring and auditing the
targets specified in the Plan to confirm that the objectives of the Plan are met.
16. Independent Evaluator
Public Utilities Code section 8387(c) requires VPU to contract with a qualified
independent evaluator with experience in assessing the safe operation of electrical
infrastructure to review and assess the comprehensiveness of this Wildfire Mitigation
Plan. The independent evaluator must issue a report that is posted to the City of
Vernon’s website. This report must also be presented to the Vernon City Council at a
public meeting.
VPU participated in a public request for proposals, to identify the best qualified
independent evaluator to assess the comprehensiveness of VPU’s Wildfire Mitigation .
.
Item 7 Page 23 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 16
Plan. VPU contracted with Dudek & Associates, a qualified independent evaluator with
experience in assessing the safe operation of electrical infrastructure. Dudek’s
Independent Evaluation is attached in Appendix A of this Plan.
The independent evaluator’s report is posted to the City of Vernon’s website and has
been presented to Vernon’s City Council at a noticed public meeting.
17. Acronym Glossary
AB (Assembly Bill)
CAISO (California Independent System Operation)
CAL FIRE (California Department of Forestry and Fire Protection)
CPUC (California Public Utilities Commission)
CUEA (California Utilities Emergency Association)
ERM (Enterprise Risk Management)
FRAP (Fire Resource and Assessment Program)
GHG (Greenhouse gas)
GIS (Geographic Information System)
GO (General Order)
KV (Kilovolt)
KWH (Kilowatt Hours)
MW (Mega Watts)
O&M (Operations & Maintenance)
EOC (Emergency Operations Centers)
OES (Office of Emergency Services)
PUC (Public Utilities Code)
SB (Senate Bill)
SEMS (Standardized Emergency Management System)
SME (Subject Matter Expert)
T&D (Transmission and Distribution)
WMP (Wildfire Mitigation Plan)
.
.
Item 7 Page 24 of 25
VERNON WILDFIRE MITIGATION PLAN 20242025 Page 17
Appendix A: Independent
Evaluation of Vernon Plan
.
.
Item 7 Page 25 of 25
City Council Agenda Report
Meeting Date:July 1, 2025
From:Todd Dusenberry, General Manager of Public Utilities
Department:Public Utilities
Submitted by:Adriana Ramos, Senior Management Analyst
Subject
Services Agreement with Nalco Company LLC
Recommendation
A. Approve and authorize the City Administrator to execute a Service Agreement with Nalco
Company LLC, in substantially the same form as submitted, to provide chemical water treatment
services for a total amount not to exceed $913,408.80, for a three-year term; and
B. Authorize a contingency amount of fifteen percent (15%) or $137,011.32 in the event of any
price adjustments or other market factors, and grant authority to the City Administrator to approve
and execute amendments up to the contingency amount, if necessary.
Background
The Malburg Generating Station (MGS) requires chemical water treatment services that include
chemical supply, chemical program oversight, and training for staff. MGS utilizes recycled treated
water as its primary source of raw water for all operational processes. The proper application of
chemical treatments maximizes unit efficiency and availability by minimizing scale, corrosion,
fouling, and microbiological growth, which can result in decreased efficiency in power plant
systems and components.
The City has engaged Nalco Company LLC (Nalco) for the procurement of Chemical Water
Treatment Services. On June 21, 2022, the City Council approved a three-year Services
Agreement with Nalco for chemical water treatment services. The current agreement is set to
expire on June 30, 2025. As per Vernon Municipal Code (VMC) Section 3.32.080, on April 17,
2025, staff issued a request for Proposals (RFP) to seek proposals from qualified firms to provide
chemical water treatment Services for MGS. The RFP was advertised on the City’s Planet Bids
platform. The scope of services encompasses supplying chemical products, developing a
chemical program, and training City personnel on the implementation and upkeep of the water
treatment systems.
Proposal packages were received from three firms by the May 5, 2025 deadline. A qualified panel
thoroughly examined the proposals based on qualifications (40%), cost (30%), references (20%),
and responsiveness to the RFP (10%). Based on the evaluation process, the proposal submitted
by Nalco demonstrated a combination of expertise, understanding, experience, and a
comprehensive approach that was best suited to fulfill the scope of services outlined in the RFP.
The proposal submitted by Nalco ranked the highest score across the panel and was, therefore,
deemed most qualified. Nalco specializes in solutions for water and process management, and
it is the world's largest manufacturer and marketer of specialty water treatment chemicals.
Staff recommends that the City Council approve a Services Agreement with Nalco for chemical
water treatment services for a total amount not to exceed $913,408.80, which includes estimated
sales taxes of $86,794.50. Additionally, staff recommends a contingency amount of fifteen
percent (15%) or $137,011.32, to cover any price adjustments or market changes, for a combined
total not to exceed $1,050,420.12. Pursuant to VMC Section 3.32.030(A), City Council approval
is required for the proposed agreement, as the total value of the contract exceeds $100,000.
.
.
Item 8 Page 1 of 2
The proposed Services Agreement has been reviewed and approved as to form by the City
Attorney’s Office.
Fiscal Impact
The fiscal impact is not-to-exceed $1,050,420.12. Sufficient funds are available in the Electric
Fund, Malburg Generating Station, Chemicals, Account No. 055-050-586-520235 for FY 2025-
26, and will be budgeted in subsequent years.
Attachments
1. Services Agreement with Nalco Company LLC
.
.
Item 8 Page 2 of 2
SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND NALCO COMPANY
LLC FOR CHEMICAL WATER TREATMENT SERVICES FOR THE MALBURG
GENERATING STATION
COVER PAGE
Contractor: Nalco Company LLC
Responsible Principal of Contractor: Scott Isherwood, District Manager
Notice Information - Contractor: Nalco Company LLC
1601 W. Diehl Rd.
Naperville, IL 60563-1198
Attention: General Counsel,
Industrial Sector
Telephone: (509) 431-5062
Notice Information - City: City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
Attention: Todd Dusenberry,
General Manager
Telephone: (323) 583-8811 ext. 579
Commencement Date: July 1, 2025
Termination Date: June 30, 2028
Consideration: Total not to exceed $913,408.80
(includes all applicable sales tax); and
more particularly described in Exhibit B
Records Retention Period Three (3) years, pursuant to Section
11.20
.
.
Item 8 Page 1 of 46
Nalco Company LLC
Services Agreement
Page 2 of 24
______________________
SERVICES AGREEMENT BETWEEN THE CITY OF VERNON AND NALCO COMPANY
LLC FOR CHEMICAL WATER TREATMENT FOR THE MALBURG GENERATING
STATION
This Agreement is made between the City of Vernon, a California charter City
and California municipal corporation (“City”), and Nalco Company LLC, a Delaware
limited liability company (“Contractor”).
The City and Contractor agree as follows:
1.0 EMPLOYMENT OF CONTRACTOR. City agrees to engage Contractor to
perform the services as hereinafter set forth as authorized by the City Council on July 1,
2025.
2.0 SCOPE OF SERVICES.
2.1 Contractor shall perform all work necessary to complete the
services set forth in the City’s Request for Proposals issued on or about April 16, 2025,
and titled RFP for Chemical Water Treatment for the Malburg Generating Station, and
Contractor's proposal to the City ("Proposal") dated May 5, 2025, Exhibit “A”, a copy
which is attached to and incorporated into this Agreement by reference.
2.2 All services shall be performed to the reasonable satisfaction of
City.
2.3 All services shall be performed in a competent, professional, and
reasonably satisfactory manner in accordance with the prevailing industry standards for
such services.
3.0 PERSONNEL.
3.1 Contractor represents that it employs, or will employ, at its own
expense, all personnel required to perform the services under this Agreement.
3.2 Contractor shall not subcontract any services to be performed by it
under this Agreement without prior written approval of City.
3.3 All of the services required hereunder will be performed by
Contractor or by City approved subcontractors. Contractor, and all personnel engaged
in the work, shall be fully qualified and authorized or permitted under State and local law
to perform such services and shall be subject to approval by the City.
.
.
Item 8 Page 2 of 46
Nalco Company LLC
Services Agreement
Page 3 of 24
______________________
4.0 TERM. The term of this Agreement shall commence on July 1, 2025, and
it shall continue until June 30, 2028, unless terminated at an earlier date pursuant to the
provisions thereof.
5.0 COMPENSATION AND FEES.
5.1 Contractor has established rates for the City of Vernon which are
comparable to and do not exceed the best rates offered to other governmental entities
in and around Los Angeles County for the same services. For satisfactory and timely
performance of the services, the City will pay Contractor in accordance with the
payment schedule set forth in Exhibit “B” attached hereto and incorporated herein by
reference.
5.2 Contractor's grand total compensation for the entire term of this
Agreement, shall not exceed $913,408.80 without the prior authorization of the City, as
appropriate, and written amendment of this Agreement. Contractor will provide notice to
City if the limit is approached. In the event that the parties are not able to agree to
amendment to adjusts the limit, Contractor shall be free to cease performing when the
limit is reached.
5.3 Contractor shall, at its sole cost and expense, furnish all necessary
and incidental labor, material, supplies, facilities, equipment , and transportation which
may be required for furnishing services pursuant to this Agreement. Materials shall be
of the highest quality. The above Agreement fee shall include all staff time and all
clerical, administrative, overhead, insurance, reproduction, telephone, air travel, auto
rental, subsistence, and all related costs and expenses.
5.4 City shall reimburse Contractor only for those costs or expenses
specifically approved in this Agreement, or specifically approved in writing in advance
by City. Unless otherwise approved, such costs shall be limited and include nothing
more than the following costs incurred by Contractor:
5.4.1 The actual costs of subcontractors for performance of any of
the services that Contractor agrees to render pursuant to this Agreement, which have
been approved in advance by City and awarded in accordance with this Agreement.
5.4.2 Approved reproduction charges.
.
.
Item 8 Page 3 of 46
Nalco Company LLC
Services Agreement
Page 4 of 24
______________________
5.4.3 Actual costs and/or other costs and/or payments specifically
authorized in advance in writing and incurred by Contractor in the performance of this
Agreement.
5.5 Contractor shall not receive any compensation for extra work
performed without the prior written authorization of City. As used herein, “extra work”
means any work that is determined by City to be necessary for the proper completion of
the Project, but which is not included within the Scope of Services and which the parties
did not reasonably anticipate would be necessary at the time of execution of this
Agreement but which the Contractor has agreed to accept and is reasonably able to
provide with its staffing for the City site. Compensation for any authorized extra work
shall be paid in accordance with the payment schedule as set forth in Exhibit “B,” if the
extra work has been approved by the City.
5.6 Licenses, Permits, Fees, and Assessments. Contractor shall
obtain, at Contractor’s sole cost and expense, such licenses, permits, and approvals as
may be required by law for the performance of the services required by this Agreement.
Contractor shall have the sole obligation to pay for any fees, assessments, and taxes
(other than sales or use taxes, which will be invoiced as a separate item ), plus
applicable penalties and interest, which may be imposed by law and which arise from or
are necessary for the performance of the Services by this Agreement. Contractor will
not be responsible for any licenses or permits associated with the City’s operation of its
facilities.
6.0 PAYMENT.
6.1 As scheduled services are completed, Contractor shall submit to
the City an invoice for the services completed, authorized expenses, and authorized
extra work actually performed or incurred according to said schedule.
6.2 Each such invoice shall state the basis for the amount invoiced,
including a detailed description of the services completed, the number of hours spent,
reimbursable expenses incurred and any extra work performed.
6.3 Contractor shall also submit a progress report with each invoice
.
.
Item 8 Page 4 of 46
Nalco Company LLC
Services Agreement
Page 5 of 24
______________________
that describes in reasonable detail the services and the extra work, if any, performed in
the immediately preceding calendar month.
6.4 Contractor understands and agrees that invoices which lack
sufficient detail to measure performance will be returned and not processed for
payment.
6.5 City will pay Contractor the amount invoiced within thirty (30) days
after the City approves the invoice.
6.6 Payment of such invoices shall be payment in full for all services,
authorized costs, and authorized extra work covered by that invoice.
7.0 CITY'S RESPONSIBILITY. City shall cooperate with Contractor as may
be reasonably necessary for Contractor to perform its services; and will give any
required decisions as promptly as practicable so as to avoid unreasonable delay in the
progress of Contractor's services.
8.0 COORDINATION OF SERVICES. Contractor agrees to work closely with
City staff in the performance of Services and shall be available to City’s staff,
consultants, and other staff at all reasonable times.
9.0 INDEMNITY. Contractor agrees to indemnify City, its officers, elected
officials, employees and agents against, and will hold and save each of them harmless
from, any and all actions, suits, claims, losses, costs, penalties, obligations, errors,
omissions or liabilities for injury to persons or damages to tangible property (herein
“claims or liabilities”), including but not limited to professional negligence, tha t are
asserted or claimed by third party to the extent arising out of or in connection with
negligence or willful misconduct in the work, operations or activities of Contractor, its
agents, employees, subcontractors, or invitees, provided for herein, or arising from the
acts or omissions of Contractor hereunder, except to the extent such claims or liabilities
arise from the gross negligence or willful misconduct of City, its officers, elected
officials, agents or employees.
10.0 INSURANCE. Contractor shall procure and maintain for the duration of
the Agreement insurance against claims for injuries to persons or damage to property
that may arise from or in connection with the performance of the work hereunder by the
.
.
Item 8 Page 5 of 46
Nalco Company LLC
Services Agreement
Page 6 of 24
______________________
Contractor, its agents, representative, or employees. The policies shall state that they
afford primary coverage.
10.1 Automobile Liability Insurance – Primary insurance coverage shall be
written on ISO Business Auto coverage form for all owned, hired, and non -owned
automobiles or any auto. The policy shall have a combined single limit of not less than
one million dollars ($1,000,000). If Contractor is transporting one or more non -
employee passengers in the performance of the services, the automobile liability policy
shall have a combined single limit of two million dollars ($2,000,000). If Contractor
owns no autos, a hired, non-owned auto endorsement to the General Liability policy is
acceptable.
10.1.1 Contractor agrees to subrogate automobile liability resulting from
performance under this agreement by agreeing to defend,
indemnify, and hold harmless, the City, and its respective
employees, agents, and City Council from and against all claims,
liabilities, suits, losses, damages, injuries and expenses, including
all costs and reasonable attorney’s fees (“Claims”), which are
attributable to any act or omission by the Contractor under the
performance of the services. The City of Vernon, its directors,
commissioners, officers, employees, agents, and volunteers must
be endorsed on the policy as additional insureds and, under the
Contractors’ policy, there shall be a waiver of subrogation, and the
policy shall be primary and non-contributory and will not seek
contribution from the City’s insurance. All grants of additional
insured and primary non-contributory status, and all waivers of
subrogation, are subject to the contractor’s indemnification
obligations included in this agreement.
10.2 Commercial General Liability Insurance – Contractor shall carry General
Liability Insurance covering all operations performed by or on behalf of the Contractor
providing coverage for bodily injury and property damage with a single limit of not less
than one million dollars ($1,000,000) per occurrence and two million dollars
.
.
Item 8 Page 6 of 46
Nalco Company LLC
Services Agreement
Page 7 of 24
______________________
($2,000,000) general aggregate limit written on an Insurance Services Office (ISO)
Comprehensive General Liability "occurrence" Form CG 00 01 or its equivalent for
coverage on an occurrence basis. The City of Vernon, its directors, commissioners,
officers, employees, agents, and volunteers must be endorsed on the policy as
additional insureds with respect to liability arising out of the Contractor's performance of
this Agreement. The additional insured coverage under the Contractor’s policy shall be
primary and non-contributory and will not seek contribution from the City’s insurance.
The policy shall be endorsed to include a waiver of subrogation.
10.2.1 If Contractor intends to employ other contractors as part of the
services rendered, the City must approve and will establish the
appropriate insurance requirements.
10.2.2 Contractor agrees to subrogate General Liability resulting from
performance under this agreement by agreeing to defend,
indemnify, and hold harmless, the City, and its respective
employees, agents, and City Council from and against all claims,
liabilities, suits, losses, damages, injuries and expenses, including
all costs and reasonable attorney’s fees (“Claims”), which are
caused by negligence or willful misconduct of the Contractor under
the performance of the services.
10.3 Professional Errors and Omissions Coverage in a sum of not less than
one million dollars ($1,000,000), where such risk is applicable. Applicable aggregate
must be identified and claims history provided to determine amounts remaining under
the aggregates. Contractor shall maintain such coverage for at least one (1) year after
the termination of this agreement.
10.4 Umbrella Liability Insurance – An umbrella (over primary) may be used to
comply with limits or other primary coverage requirements. When used, the umbrella
policy shall apply to bodily injury/property damage and personal injury/advertising injury
and shall include a “dropdown” provision providing primary coverage for any liability not
covered by the primary policy. The umbrella policy shall have no additional exclusion or
coverage difference from the primary policy. The coverage shall also apply to
.
.
Item 8 Page 7 of 46
Nalco Company LLC
Services Agreement
Page 8 of 24
______________________
automobile liability.
10.5 Workers’ Compensation/Employers Liability - Contractor shall comply with
the applicable sections of the California Labor Code concerning workers' compensation
for injuries on the job. Compliance is accomplished in one of the following manners:
10.5.1 Provide a copy of the permissive self-insurance certificate approved
by the State of California; or
10.5.2 Secure and maintain in force a policy of workers' compensation
insurance with statutory limits and Employer's Liability Insurance
with a limit of one million dollars ($1,000,000) per accident. The
policy shall be endorsed to waive all rights of subrogation against
City, its directors, commissioners, officers, employees, and
volunteers for losses arising from performance of this Agreement or
10.5.3 If Contractor has no employees, it may certify or warrant to the City
that it does not currently have any employees or individuals who
are defined as “employees” under the Labor Code, and the
requirement for Workers’ Compensation coverage will be waived by
completing the waiver form provided by the City.
10.6 If Contractor maintains broader coverage and/or higher limits than the
minimums shown above, City requires and shall be entitled to the broader coverage
and/or the higher limits maintained by the Contractor. Any available insurance proceeds
in excess of the specified minimum limits of insurance and coverage shall be available
to the City.
10.7 Each insurance policy included in this clause shall be endorsed to state
that coverage shall not be cancelled except after thirty (30) days prior written notice to
City.
10.8 Insurance shall be placed with insurers with an A.M. Best rating of no less
than A-VIII. Any policies written on a claims-based basis must include a minimum of a
3-year tail.
10.9 Prior to the commencement of performance, Contractor shall furnish City
with a certificate of insurance for each policy. Each certificate is to be signed by a
.
.
Item 8 Page 8 of 46
Nalco Company LLC
Services Agreement
Page 9 of 24
______________________
person authorized by that insurer to evidence coverage on its behalf. The certificate(s)
must be in an Acord form approved by City. City may require complete, certified copies
of any or all policies upon request.
10.10 Failure to maintain required insurance at all times shall constitute a default
and material breach. In such event, Contractor shall immediately notify City and cease
all performance under this Agreement until further directed by the City. In the absence
of satisfactory insurance coverage, City may, at its option: (a) procure insurance with
collection rights for premiums, attorney's fees, and costs against Contractor by way of
set-off or recoupment from sums due to Contractor, at City's option; (b) immediately
terminate this Agreement and seek damages from the Agreement resulting from said
breach; or (c) self-insure the risk, with all damages and costs incurred, by judgment,
settlement or otherwise, including attorney's fees and costs, being collectible from
Contractor, by way of set-off or recoupment from any sums due to Contractor.
Notwithstanding anything in this Agreement to the contrary, all grants of
additional insured and primary and non-contributory status are subject to Contractor’s
indemnification obligations included in this Agreement, and all waivers of subrogation
shall not extend to damages that are caused by negligence or willful misconduct of the
City or any other Additional Insureds.
11.0 GENERAL TERMS AND CONDITIONS.
11.1 INDEPENDENT CONTRACTOR.
11.1.1 It is understood that in the performance of the services
herein provided for, Contractor shall be, and is, an independent contractor, and is not an
agent, officer or employee of City and shall furnish such services in its own manner and
method except as required by this Agreement, or any applicable statute, rule, or
regulation. Further, Contractor has and shall retain the right to exercise full control over
the employment, direction, compensation and discharge of all persons employed by
Contractor in the performance of the services hereunder. City assumes no liability for
Contractor’s actions and performance, nor assumes responsibility for taxes, bonds,
payments, or other commitments, implied or explicit, by or for Contractor. Contractor
shall be solely responsible for, and shall indemnify, defend and save City harmless from
.
.
Item 8 Page 9 of 46
Nalco Company LLC
Services Agreement
Page 10 of 24
______________________
all matters relating to the payment of its employees, subcontractors and independent
contractors, including compliance with social security, withholding and all other wages,
salaries, benefits, taxes, exactions, and regulations of any nature whatsoever.
11.1.2 Contractor acknowledges that Contractor and any
subcontractors, agents or employees employed by Contractor shall not, under any
circumstances, be considered employees of the City, and that they shall not be entitled
to any of the benefits or rights afforded employees of City, including, but not limited to,
sick leave, vacation leave, holiday pay, Public Employees Retirement System benefits,
or health, life, dental, long-term disability or workers' compensation insurance benefits.
11.2 CONTRACTOR NOT AGENT. Except as the City may authorize
in writing, Contractor and its subcontractors shall have no authority, express or implied,
to act on behalf of or bind the City in any capacity whatsoever as agents or otherwise.
11.3 OWNERSHIP OF WORK. All documents and materials furnished
by the City to Contractor shall remain the property of the City and shall be returned to
the City upon termination of this Agreement. All reports, drawings, plans, specifications,
computer tapes, floppy disks and printouts, studies, memoranda, computation sheets ,
and other documents prepared by Contractor in furtherance of the work shall be the
sole property of City and shall be delivered to City whenever requested at no additional
cost to the City. Contractor shall keep such documents and materials on file and
available for audit by the City for at least three (3) years after completion or earlier
termination of this Agreement. Contractor may make duplicate copies of such materials
and documents for its own files or for such other purposes as may be authorized in
writing by the City.
11.4 CORRECTION OF WORK. Contractor shall promptly correct any
defective, inaccurate or incomplete tasks, deliverables, goods, services and other work,
without additional cost to the City. The performance or acceptance of services
furnished by Contractor shall not relieve the Contractor from the obligation to correct
subsequently discovered defects, inaccuracy, or incompleteness.
11.5 RESPONSIBILITY FOR ERRORS. Contractor shall be responsible
for its work and results under this Agreement. Contractor, when requested, shall furnish
.
.
Item 8 Page 10 of 46
Nalco Company LLC
Services Agreement
Page 11 of 24
______________________
clarification and/or explanation as may be required by the City, regarding any services
rendered under this Agreement at no additional cost to City. In the event that an error or
omission attributable to Contractor occurs, then Contractor shall, at no cost to City,
provide all necessary design drawings, estimates and other Contractor professional
services necessary to rectify and correct the matter to the reasonable satisfaction of
City and to participate in any meeting required with regard to the correction. The goods
and services do not cover, and Contractor makes no warranties with respect to, water
system biohazards from waterborne pathogens, including but not limited to Legionella
bacteria. Contractor shall not be liable for any failure caused by City’s f ailure to follow
Contractor’s written instructions. CONTRACTOR DISCLAIMS ALL OTHER
WARRANTIES, EXPRESS OR IMPLIED, AND DISCLAIMS THE IMPLIED
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR
PURPOSE.
11.6 WAIVER. The City's waiver of any term, condition, breach, or
default of this Agreement shall not be considered to be a waiver of any other term,
condition, default or breach, nor of a subsequent breach of the one waived. The delay
or failure of either party at any time to require performance or compliance by the other
of any of its obligations or agreements shall in no way be deemed a waiver of those
rights to require such performance or compliance. No waiver of any provi sion of this
Agreement shall be effective unless in writing and executed by a duly authorized
representative of the party against whom enforcement of a waiver is sought.
11.7 SUCCESSORS. This Agreement shall inure to the benefit of, and
shall be binding upon, the parties hereto and their respective heirs, successors, and/or
assigns.
11.8 NO ASSIGNMENT. Contractor shall not assign or transfer this
Agreement or any rights hereunder without the prior written consent of the City and
approval by the City Attorney, which may be withheld in the City's sole discretion. Any
unauthorized assignment or transfer shall be null and void and shall constitute a
material breach by the Contractor of its obligations under this Agreement. No
.
.
Item 8 Page 11 of 46
Nalco Company LLC
Services Agreement
Page 12 of 24
______________________
assignment shall release the original parties from their obligations or otherwise
constitute a novation.
11.9 COMPLIANCE WITH LAWS. Contractor shall comply with all
Federal, State, County and City laws, ordinances, rules and regulations, which are, as
amended from time to time, incorporated herein and applicable to the performance
hereof. Violation of any law material to performance of this Agreement shall entitle the
City to terminate the Agreement and otherwise pursue its remedies. Further, if the
Contractor performs any work knowing it to be contrary to such laws, rules, and
regulations Contractor shall be solely responsible for all costs arising therefrom.
11.10 ATTORNEY'S FEES. If any action at law or in equity is brought to
enforce or interpret the terms of this Agreement, the prevailing party shall be entitled to
reasonable attorney's fees, costs, and necessary disbursements in addition to any other
relief to which such party may be entitled.
11.11 CONSEQUENTIAL DAMAGES DISCLAIMER, LIABILITY CAP.
NOTWITHSTANDING ANYTHING TO THE CONTRARY CONTAINED HEREIN OR
OTHERWISE, IN NO EVENT SHALL EITHER PARTY BE LIABLE FOR ANY SPECIAL,
CONSEQUENTIAL OR INDIRECT DAMAGES. EXCEPT FOR DAMAGES WHICH
ARISE OR RESULT FROM FRAUD OR WILLFUL MISCONDUCT OF CONTRACTOR
OR ANY OF ITS SUBCONTRACTORS, CONTRACTOR´S AGGREGATE LIABILITY
SHALL NOT EXCEED 200% OF THE TOTAL PAYMENTS MADE BY CITY IN THE
TWELVE (12) MONTH PERIOD IMMEDIATELY PRECEDING THE ALLEGED INJURY;
DAMAGE OR CLAIM; EXCEPT TO THE EXTENT DAMAGES TO TANGIBLE
PROPERTY OR PERSONAL INJURY OR DEATH ARE CAUSED BY
CONTRACTOR´S FRAUD OR WILLFUL MISCONDUCT.
11.12 CONTRACTOR-OWNED EQUIPMENT TERMS. The additional
terms and conditions applicable to Contractor-owned equipment provided to City on a
rental or usage basis and the additional terms applicable to Contractor’s digital
programs are set forth in Exhibit E.
.
.
Item 8 Page 12 of 46
Nalco Company LLC
Services Agreement
Page 13 of 24
______________________
11.13 INTERPRETATION.
11.13.1 Applicable Law. This Agreement shall be deemed an
agreement and shall be governed by and construed in accordance with the laws of the
State of California. Contractor agrees that the State and Federal courts which sit in the
State of California shall have exclusive jurisdiction over all controversies and disputes
arising hereunder, and submits to the jurisdiction thereof.
11.13.2 Entire Agreement. This Agreement, including any
exhibits attached hereto, constitutes the entire agreement and understanding between
the parties regarding its subject matter and supersedes all prior or contemporaneous
negotiations, representations, understandings, correspondence, documentation, and
agreements (written or oral).
11.13.3 Written Amendment. This Agreement may only be
changed by written amendment executed by Contractor and the City Administrator or
other authorized representative of the City, subject to any requisite authorization by the
City Council. Any oral representations or modifications concerning this Agreement shall
be of no force or effect.
11.13.4 Severability. If any provision in this Agreement is held by
any court of competent jurisdiction to be invalid, illegal, void, or unenforceable, such
portion shall be deemed severed from this Agreement, and the remaining provisions
shall nevertheless continue in full force and effect as fully as though such invalid, illegal,
or unenforceable portion had never been part of this Agreement.
11.13.5 Order of Precedence. In case of conflict between the
terms of this Agreement and the terms contained in any document attached as an
Exhibit or otherwise incorporated by reference, the terms of this Agreement shall strictly
prevail. The terms of the City’s Request for Proposals shall control over the Contractor’s
Proposal.
11.13.6 Construction. In the event an ambiguity or question of
intent or interpretation arises with respect to this Agreement, this Agreement shall be
construed as if drafted jointly by the parties and in accordance with its fair meaning.
.
.
Item 8 Page 13 of 46
Nalco Company LLC
Services Agreement
Page 14 of 24
______________________
There shall be no presumption or burden of proof favoring or disfavoring any party b y
virtue of the authorship of any of the provisions of this Agreement.
11.14 TIME OF ESSENCE. Time is strictly of the essence of this
agreement and each and every covenant, term, and provision hereof.
11.15 AUTHORITY OF CONTRACTOR. The Contractor hereby
represents and warrants to the City that the Contractor has the right, power, legal
capacity, and authority to enter into and perform its obligations under this Agreement,
and its execution of this Agreement has been duly authorized.
11.16 ARBITRATION OF DISPUTES. Any dispute for under $25,000
arising out of or relating to the negotiation, construction, performance, non -performance,
breach, or any other aspect of this Agreement, shall be settled by binding arbitration in
accordance with the Commercial Rules of the American Arbitration Association at Los
Angeles, California and judgment upon the award rendered by the Arbitrators may be
entered in any court having jurisdiction thereof. The City does not waive its right to
object to the timeliness or sufficiency of any claim filed or required to be filed against the
City and reserves the right to conduct full discovery.
11.17 NOTICES. Any notice or demand to be given by one party to the
other must be given in writing and by personal delivery or prepaid first-class, registered
or certified mail, addressed as follows. Notice simply to the City of Vernon or any other
City department is not adequate notice.
If to the City:
City of Vernon
Attention: Todd Dusenberry, General Manager
4305 Santa Fe Avenue
Vernon, CA 90058
If to the Contractor:
Nalco Company LLC
Scott Isherwood, District Manager
1601 W. Diehl Rd.
Naperville, IL 60563-1198
.
.
Item 8 Page 14 of 46
Nalco Company LLC
Services Agreement
Page 15 of 24
______________________
Any such notice shall be deemed to have been given upon delivery, if
personally delivered, or, if mailed, upon receipt, or upon expiration of three (3) business
days from the date of posting, whichever is earlier. Either party may change the address
at which it desires to receive notice upon giving written notice of such request to the
other party.
11.18 NO THIRD PARTY RIGHTS. This Agreement is entered into for the
sole benefit of City and Contractor and no other parties are intended to be direct or
incidental beneficiaries of this Agreement and no third party shall have any right or
remedy in, under, or to this Agreement.
11.19 TERMINATION FOR CONVENIENCE (Without Cause). City may
terminate this Agreement in whole or in part at any time, for any cause or without cause,
upon 30 calendar days' written notice to Contractor. Contractor may terminate for
convenience upon 6 months prior written notice. If the Agreement is thus terminated by
City for reasons other than Contractor's failure to perform its obligations, City shall pay
Contractor a prorated amount based on the services satisfactorily completed and
accepted prior to the effective date of termination. Such payment shall be Contractor's
exclusive remedy for termination without cause.
11.20 DEFAULT. In the event either party materially defaults in its
obligations hereunder, the other party may declare a default and terminate this
Agreement by written notice to the defaulting party. The notice shall specify the basis for
the default. The Agreement shall terminate unless such default is cured before the
effective date of termination stated in such notice, which date shall be no sooner than
30 days after the date of the notice. In case of default by Contractor, the City reserves
the right to procure the goods or services from other sources and to hold the Contractor
responsible for any excess costs occasioned to the City thereby. Contractor shall not be
held accountable for additional costs incurred due to delay or default as a result of
Force Majeure. Contractor must notify the City immediately upon knowing that non -
performance or delay will apply to this Agreement as a result of Force Majeure. At that
time Contractor is to submit in writing a Recovery Plan for this Agreement. If the
Recovery Plan is not acceptable to the City or not received within 30 days of the
.
.
Item 8 Page 15 of 46
Nalco Company LLC
Services Agreement
Page 16 of 24
______________________
necessary notification of Force Majeure default, then the City may cancel this order in
its entirety at no cost to the City, owing only for goods and services completed to that
point.
11.21 TERMINATION FOR CAUSE. Termination for cause shall relieve
the terminating party of further liability or responsibility under this Agreement, including
the payment of money, except for payment for services satisfactorily and timely
performed prior to the service of the notice of termination, and except for reimbursement
of (1) any payments made by the City for service not subsequently performed in a timely
and satisfactory manner, and (2) direct costs incurred by the City in obtaining substitute
performance. If this Agreement is terminated as provided herein, City may require, at no
additional cost to City, that Contractor provide all finished or unfinished documents,
data, and other information of any kind prepared by Contractor in connection with the
performance of Services under this Agreement. Contractor shall be required to provide
such document and other information within fifteen (15) days of the request.
11.21.1 Additional Services. In the event this Agreement is
terminated in whole or in part as provided herein, City may procure, upon such terms
and in such manner as it may determine appropriate, services similar to those
terminated.
11.22 MAINTENANCE AND INSPECTION OF RECORDS.
The City, or its authorized auditors or representatives, shall have
access to and the right to audit and reproduce any of the Contractor's records to the
extent the City deems necessary to ensure it is receiving all money to which it is entitled
under the Agreement and/or is paying only the amounts to which Contractor is properly
entitled under the Agreement or for other purposes relating to the Agreement.
The Contractor shall maintain and preserve all such records for a
period of at least three (3) years after termination of the Agreement.
Upon request, Contractor shall promptly deliver the records to the
City of Vernon.
11.23 CONFLICT. Contractor hereby represents, warrants, and certifies
that no member, officer, or employee of the Contractor is a director, officer, or employee
.
.
Item 8 Page 16 of 46
Nalco Company LLC
Services Agreement
Page 17 of 24
______________________
of the City of Vernon, or a member of any of its boards, commissions, or committees,
except to the extent permitted by law.
11.24 HEADINGS. Paragraphs and subparagraph headings contained in
this Agreement are included solely for convenience and are not intended to modify,
explain or to be a full or accurate description of the content thereof and shall not in any
way affect the meaning or interpretation of this Agreement.
11.25 ENFORCEMENT OF WAGE AND HOUR LAWS. Eight hours labor
constitutes a legal day's work. The Contractor, or subcontractor, if any, shall forfeit
twenty-five dollars ($25) for each worker employed in the execution of this Agreement
by the respective Contractor or subcontractor for each calendar day during which the
worker is required or permitted to work more than 8 hours in any one calendar day and
40 hours in any one calendar week in violation of the provisions of Sections 1810
through 1815 of the California Labor Code as a penalty paid to the City; provided,
however, work performed by employees of contractors in excess of 8 hours per day,
and 40 hours during any one week, shall be permitted upon compensation for all hours
worked in excess of 8 hours per day at not less than 1½ times the basic rate of pay.
11.26 EQUAL EMPLOYMENT OPPORTUNITY PRACTICES. Contractor
certifies and represents that, during the performance of this Agreement, it and any other
parties with whom it may subcontract shall adhere to equal employment opportunity
practices to assure that applicants, employees and recipients of service are treated
equally and are not discriminated against because of their race, religion, color, national
origin, ancestry, disability, sex, age, medical condition, sexual orientation or marital
status. Contractor further certifies that it will not maintain any segregated facilities.
Contractor further agrees to comply with The Equal Employment Opportunity Practices
provisions as set forth in Exhibit “C”.
[Signatures Begin on Next Page].
.
.
Item 8 Page 17 of 46
Nalco Company LLC
Services Agreement
Page 18 of 24
______________________
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the
Commencement Date stated on the cover page.
City of Vernon, a California charter City
and California municipal corporation
By: ____________________________
Brian Saeki, City Administrator
Nalco Company LLC, a Delaware limited
liability company
By:
Name:
Title:
ATTEST:
_______________________________
Genoveva Rocha, City Clerk
By:
Name:
Title:
APPROVED AS TO FORM:
_______________________________
Zaynah N. Moussa,
City Attorney
.
.
Item 8 Page 18 of 46
Nalco Company LLC
Services Agreement
Page 19 of 24
______________________
EXHIBIT A
CONTRACTOR'S PROPOSAL
.
.
Item 8 Page 19 of 46
Proposal for Water Treatment
Services and Chemicals
Page 3
Executive Summary/Introduction
Nalco Water greatly appreciates the opportunity to provide a proposal for specialty chemicals and
services for the City of Vernon’s Malburg Generating Station (MGS).
Nalco’s business model is based on creating and maintaining value (CMV) for our customers. By focusing
on our customer’s Key Business Drivers and aligning our projects and service plans to apply to those key
drivers. Every aspect of how we do business, from ensuring the product is properly made, delivered
professionally, and used in the most cost-effective manner is done to provide a business partnership with
our customers that will EXCEED THEIR EXPECTATIONS.
In the proposal we have summarized the treatment program based on the specifications supplied in the
City of Vernon RFP.
• All pricing listed in the following proposal is valid for a minimum of 90 days.
• The estimated annual cost for the specialty treatment chemicals as based upon 2023/2024
historical capacity factors, is $86,481.48. The detailed breakdown of these chemicals for the
MGS facility is located within the report.
• The estimated costs for commodity chemistry is $173,468.62. See the proposal for details.
• Our proposal includes the installation and lease of a NEW 3DTrasar All-In-One controller for
monitoring and control of the tower chemistry. This controller has all the features of the NextGen
controller currently being used with the addition of a Real Time Deposit Monitor, which will
provide an additional level of protection from scale or microbiological challenges. The AIO
controller provides connectivity and security, as well as the 24/7 system monitoring, automated
reporting, and alarm service you have been using at a rate of $1,000 per month.
• The proposal includes access to the City of Vernon’s unique Ecolab3D web site where Nalco
reports, site-specific documentation (Program Administration Manual, etc.), SDS’s, and other
information can be found 24/7. This includes the use of Nalco’s web-based Ecolab3D E-data
management system for the recording of site water chemistry, inventory, and equipment logs.
This service is customized to meet any of your site sampling and logging needs. There is a
charge of $324/month for this service.
• The estimated annual value of routine offsite analytical testing, including legionella testing is
estimated at $7,858. Nalco is proposing to include these tests at no charge to the City of Vernon.
Not only have we provided a very competitive program, but Nalco is also uniquely positioned to continue
supporting the City of Vernon with any subsequent design changes/alterations with our broad engineering
support and plant modeling capabilities.
We look forward to presenting our capabilities and discussing this proposal with you.
Chris Buchholz Zach Kahalioumi Scott Isherwood
Area Manager Field Service Rep District Manager
(510) 207-1666 (281) 318-9863 (509) 431-5062
cbuchholz@ecolab.com Zachary.kahalioumi@ecolab.com skisherwood@ecolab.com
.
.
Item 8 Page 20 of 46
Proposal for Water Treatment
Services and Chemicals
Page 4
Support Personnel and Service
The Nalco Representative
We strive to hire and develop the best people. The Nalco Water logo represents a network of
employees all focused on helping customers achieve a return on their investment with Nalco.
Following are characteristics of a Nalco representative: professional, problem-solver and problem
preventer.
A network of experts in customer service, product development, environmental compliance,
analytical and metallurgical testing, process simulation, automation technology, chemical
handling, operator training, and more, backs up every Nalco representative.
Local Representatives for the City of Vernon
Following is a summary of team members who have direct responsibility for the successful
implementation and operation of the chemical treatment programs for the Malburg Generating
Station. These individuals will have support from the entire Nalco organization. Nalco is the
largest manufacturer and marketer of specialty water treatment chemicals in the world, with
numerous highly trained technical engineers and support personnel.
The professional support you will receive from Nalco is extensive and forms the foundation of
water management programs you will receive. The following summaries present information on
the primary members of the Nalco Water team.
Area Manager: Chris Buchholz
Residence: Pleasant Hill, CA
Current Assignment: Area Manager
Education: University of Washington
Degree: B.S Mechanical Engineering
Years with Nalco: 30 years
Provided oversight, service, and engineering support during the construction and startup of
seven (7) different Combined Cycle plants in the Bay Area. Currently provides water treatment
service to nine (9) different combined cycle plants in the Bay Area and Southern California.
Extensive experience in the Power Industry working with over 25 different combined cycle
plants in California over the last 30 years.
Customer References
Jon Santibanes - O&M Manager Crockett Cogen - jon.Santibanes@ethosenergy.com
Ron Pagtalonia - Assistant Plant Manager PIC Berkeley Cogen - ronald.pagtalonia@picgroupinc.com
Jermaine Woodall - Plant Manager High Desert Power - jwoodall@mrpgenco.com
Josh Harris - Senior Plant Manager PG&E Colusa Gen Station- joshua.harris@pge.com
Doug Welch - Chem Tech PG&E Gateway Gen. Station - DGW3@pge.com
Al Rodriguez - Calpine Delta Plant Manager - arodriguez@calpine.com
.
.
Item 8 Page 21 of 46
Proposal for Water Treatment
Services and Chemicals
Page 5
Field Service Representative: Zach Kahalioumi
Residence: Cypress, CA
Current Assignment: Field Service Representative
Training: Nalco Power Group
Years with Nalco: 5 years.
Currently provides service support at eight (8) different combined cycle plants in Nevada and
California.
Customer References
Robbie Suprenant - PG&E Maintenance Supervisor - RSZ4@pge.com
John Andrade - PG&E Mechanic / Water Contact - JJAW@pge.com
Oliver Cannon - NV Energy Ops Supervisor - Oliver.cannon@nvenergy.com
Tony Green - NV Energy Ops Supervisor - Tony.Green@nvenergy.com
District Manager: Scott Isherwood
Residence: West Richland, WA
Current Assignment: District Manager
Education: University of Washington
Degree(s): Chemical Engineering
Years with Nalco: 18 years.
Technical Consultant: Derek Roberts
Residence: Fresno, CA
Current Assignment: District Account Manager
Education: US Naval Academy
Degree: Mechanical Engineering
Years with Nalco: 33 years.
Previous Experience: US Navy nuclear power
Rationale for Treatment Program Selection
Mechanical, Operational, and Chemical Assumptions
All treatment programs for the Malburg Generating Station were based on the information
provided RFP, along with several years of experience servicing the facility.
Predictive Models Used: 3D TRASAR Optimizer
This simulation program allows using the Mechanical, Operational and Chemical (MOC) make-
up properties to model the tower for acceptable scale, corrosion and microbiological control.
.
.
Item 8 Page 22 of 46
Proposal for Water Treatment
Services and Chemicals
Page 6
In the Optimizer, operating data is entered & the model selects the optimal treatment program
based on French creek and Nalco stability models integrated with Nalco’s product lines, providing
scaling and corrosion potentials. This technology is balanced against the historical results that
have been seen at the MGS facility.
Summary of Included Specialty Treatment Chemicals
SDS sheets for all the specified specialty chemicals are on file with the Malburg Generating
Station
RO and MicroFiltration Water Treatment
PermaTreat® PC-1611T - NEW – Phosphorus Free Antiscalant
RO Antiscalant
Description
PermaTreat PC-1611T is a phosphorus free antiscalant developed for reverse osmosis
(RO) membrane systems. PermaTreat PC-1611T includes the patented TRASAR®
Technology for accurate dosage and advanced monitoring and control.
Scaling and iron fouling of the RO membranes will reduce system performance and lead
to premature membrane replacement. Scaling and iron deposits build up on the RO
membrane, which leads to poor permeate quality, low permeate production,
unscheduled downtime, increased water consumption and increased energy costs.
PermaTreat PC-1611T is a specially formulated product using proprietary blend of
polymers to control iron, manganese, calcium carbonate, calcium phosphate, calcium
sulfate deposition in (RO) membrane systems. In contrast to traditional polymeric
antiscalants, PC-1611T does not contribute to membrane biofouling.
PermaTreat PC-1611T is phosphorous free, and can be used in situations where
phosphorous is limited by discharge regulations or where phosphate deposition has
been noted in the membranes.
Rationale for Selection
Nalco’s exclusive 3D TRASAR RO Optimizer Modeling program was used to determine
the product and dosage using the supplied base case. Recent RO Membrane Autopsy
analysis has shown a potential for the previous chemistry to form Polymeric Phosphate
deposits.
.
.
Item 8 Page 23 of 46
Proposal for Water Treatment
Services and Chemicals
Page 7
NALCO 7408
Chlorine Scavenger
Description
NALCO 7408 is a fast-acting dechlorination agent used to reduce the levels of residual
chlorine in chlorinated water supplies without increasing objectionable chloramines.
NALCO 7408 is a bisulfite-based material that reacts instantaneously with chlorine. It
does not include any catalyst and, therefore, reacts more slowly with oxygen. Its primary
use is dechlorination of water, feedwater for reverse osmosis (RO), feedwater to ion
exchange units, and wastewater.
NALCO 2581
Alkalinity – 25% Diaphragm Grade Sodium Hydroxide, for process optimization
NALCO 2B11
Alkalinity – 50% Diaphragm Grade Sodium Hydroxide Used for off-line cleaning to remove
organics
NALCO 8344
Iron Removal - 51% Citric Acid used for off-line cleaning for iron removal
.
.
Item 8 Page 24 of 46
Proposal for Water Treatment
Services and Chemicals
Page 8
Cooling Tower Circulating Water
3D TRASAR® 3DT487
Cooling Water Corrosion Inhibitor and Deposit Inhibitor (Mineral Dispersant)
Description
3D TRASAR 3DT487 is a balanced blend of corrosion and scale inhibitors designed for
use in open recirculating water systems. 3DT487 contains:
• Dual function phosphonate inhibitor for both cathodic corrosion and calcium
carbonate scale. The active material is a patented, proprietary chemical called
Phosphinosuccinic Oligomer (PSO).
• Phosphoric acid for anodic (pitting) corrosion inhibition
• Organic High Stress Polymer 2 (HSP2) dispersant.
Rationale for Inclusion
Nalco’s exclusive 3D TRASAR Cooling Tower Optimizer Modeling program was used to
determine the product and dosage using the supplied base case.
3D TRASAR Control System: New - Nalco All-In-One Advanced Controller with Deposit
Monitor
Due to the changing demand of your system and water chemistry, Nalco is proposing an
upgrade to our existing 3DTRASAR automation package to include our newest
Advanced 3DTRASAR All-in-One Controller with Deposit Monitor.
3D TRASAR® control helps level the peaks and valleys associated with typical feed and
bleed control strategies providing the protection needed and optimizes system
performance and program economics. Varying plant loads and the resulting blowdown
rates can rapidly change the demand for chemical. Nalco’s 3DTRASAR technology
provides direct feedback control of the Active Polymer Dispersant level in the water to
vary dosage based upon demand.
The upgraded controller will include a more robust PLC controller with both improved
data security and increased reliability.
The Nalco Deposit Monitor provides real time monitoring of the fouling potential in a
cooling water system and helps provide information to discern between Particulate
Fouling, Microbio Fouling, Silica Deposition, or General Mineral Scale formation. This
information can then be used to optimize treatment levels, blowdown limits, and pH
control to minimize water and chemical costs while providing real time program
validation and an early warning against efficiency losses in the Cooling Water system.
.
.
Item 8 Page 25 of 46
Proposal for Water Treatment
Services and Chemicals
Page 9
Nalco NALSPERSE 73551 Microbial Dispersant
Cooling Tower Fill Cleaner/Biodetergent
Description
NALSPERSE 73551 is a dispersant and detergent that can be applied to a cooling water
system including cooling tower fill, condenser water-side tubes and tube-side heat
exchangers. It cleans and prepares cooling systems so that a registered biocide can
remove microbiological-based slime and silt deposits. NALSPERSE 73551 can attach to
particles in the system changing their charge profiles such that the particles repel each
other, avoiding agglomeration, thus keeping them in solution. A properly maintained and
cleaned system will allow for optimum performance of heat exchangers and cooling and
ventilation equipment.
Nalco 90005 Non-oxidizing Biocide - Cooling Water Microbiocide
Description
90005 is a broad-spectrum, nonoxidizing biocide approved for use in recirculating
cooling towers and decorative fountains. 90005 is particularly effective in controlling
algae.
Rationale for Inclusion
90005 has been selected based on its historical effectiveness on the cooling tower at
this facility and its effectiveness on many other cooling towers throughout the power
industry. It is available, if needed or desired, for treatment of the large volume of water
in the recirculating cooling water system, often based upon the observation of algae in
the system.
Sodium Hypochlorite/Bleach
Description
Sodium Hypochlorite/Bleach is an aqueous 12.5% solution of sodium hypochlorite. It is
intended for use in cooling tower, evaporative condenser water, pulp and papermill water, and
industrial water systems. Sodium Hypochlorite represents an alternative biocide to gaseous
chlorine as a cost effective and safe oxidizing biocide.
Rationale for Inclusion
The sodium hypochlorite is a commodity chemistry but is an integral part of the cooling
tower chemical program. By including in the program, Nalco can assist with inventory
management of this critical chemistry.
.
.
Item 8 Page 26 of 46
Proposal for Water Treatment
Services and Chemicals
Page 10
Sulfuric Acid
Description
Sulfuric Acid is 93% concentrated sulfuric acid used for both alkalinity and pH control of
the cooling tower. By using acid, the cooling tower can use significantly less water
without fouling the tower fill and improves the efficacy of the oxidizing biocide program.
It should be noted that sulfuric acid can be both dangerous to handle and can do
significant damage to systems if not properly controlled. Nalco’s NextGen Cooling tower
controller not only provides a secondary pH measurement, it also watches for signs of
turbidity (due to iron dissolution) and has real time corrosion monitoring, which provides
additional security to this program.
Rationale for Inclusion
The sulfuric acid is a commodity chemistry but is an integral part of the cooling tower
chemical program. By including in the program, Nalco can assist with inventory
management of this critical chemistry.
.
.
Item 8 Page 27 of 46
Proposal for Water Treatment
Services and Chemicals
Page 11
Main Steam Cycle
.
NALCO® 5711 Amine (Steam & condensate pH Adjustment)
Description
Nalco 5711 is a volatile corrosion inhibitor that contains an aqueous blend of a volatile
neutralizing amine and ammonia designed for use in steam and condensate systems.
Nalco 5711 is designed to adjust the pH in the boiler feedwater and to protect metal
surfaces from corrosion due to dissolved acids or low pH conditions in initial and
extended areas of the steam, and feedwater system.
The combination of low and high distribution ratio components in Nalco 5711 enhances
protection in the early condensation zones of the turbine. The blend helps reduce the
tendency for Flow Assisted Corrosion (FAC) in HRSGs by maintaining pH throughout all
the pressure zones better than ammonia alone. Nalco 5711 enables maintenance of
feedwater pH targets with minimal impact on steam cation conductivity measurements.
BT-4000
Internal Boiler Treatment
Description
BT-4000 is a liquid boiler feedwater treatment that provides an excellent scale and
deposit control. BT -4000 is specifically designed as a phosphate-pH control program
(Na:PO4 ratio of 4:1) for systems with feedwater hardness of less than 20 ppb. The
product is formulated to essentially eliminate product ammonia contribution to improve
condensate system corrosion control. The suggested operating pressure limit is 2,600
psig.
Power Film 10000
POWERFILM 10000 contains a volatile surface active corrosion inhibitor designed for
use in steam and condensate systems that require additional corrosion protection due to
cyclic operations. The product is formulated “amine free” to reduce concerns regarding
breakdown and handling associated with organic neutralizing amines. POWERFILM
10000 provides a surface-active barrier which shuts down corrosion occurring in breaks,
voids and cracks in the oxide layer, limiting further oxidation of the base metal (and the
resulting “iron throw” during cycling operations.)
.
.
Item 8 Page 28 of 46
Proposal for Water Treatment
Services and Chemicals
Page 12
Closed Loop
NALCO TRAC100
Closed System Corrosion Inhibitor
Description
TRASAR TRAC100 product is a liquid corrosion inhibitor for use in closed cooling and hot
water heating systems. TRASAR TRAC100 product is a complete inhibitor that provides
ferrous metal, copper alloy and aluminum corrosion protection. TRASAR TRAC100
product is nitrite-free, minimizing the challenge of bacterial control.
Rationale for Inclusion
Trac100 recently replaced the Nitrite based inhibitor, Nalco 8338. This change was
made due to concern with oil contamination within the closed loop which could lead to
bacterial growth. Nitrite can act as a food source for the bacteria, where as Molybdate
does not.
NALCO 7330 Non-oxidizing Biocide – Closed Loop Microbiocide
Description
NALCO 7330 is a broad-spectrum, nonoxidizing biocide approved for use in recirculating
cooling towers, air washers with mist eliminators, pasteurizers, and heat transfer
systems. NALCO 7330 is particularly effective in controlling fungi and slime-forming
bacteria.
Rationale for Inclusion
Nalco 7330 has been selected based on its historical effectiveness at this facility and its
effectiveness in similar applications throughout the power industry.
.
.
Item 8 Page 29 of 46
Proposal for Water Treatment
Services and Chemicals
Page 13
Chemical Treatment Program Summary
Program Pricing
Nalco proposes to provide both Nalco Specialty Chemicals, along with the commodities of Sodium
Hypochlorite and Sulfuric Acid for use in the water treatment systems.
The pricing for the Nalco Specialty Chemicals is set for the following 12 months. See section
below on Pricing Adjustment Policy for how adjustments are made to these products.
The pricing for the commodity chemicals is set for 3 months and is evaluated every quarter based
upon commodity chemistry pricing available to Nalco. Nalco does a rigorous job of selecting and
negotiating for commodity chemistry but the chemical prices for these products can be much more
volatile than the Specialty Chemicals produced by Nalco. Commodity pricing can go up or down
on a quarterly basis depending on market trends.
It should be noted that total expenses for the MGS operation are directly tied to the run rates of
the power plant operation. In this proposal, the average run rate of 2023 and 2024 were used to
calculate expected total cost. If the run rate should be reduced significantly, the City of Vernon
should expect the expenses to drop significantly as well.
All other services, as described in the Service Plan, are included in this offering at no additional
cost to the City of Vernon.
.
.
Item 8 Page 30 of 46
Proposal for Water Treatment
Services and Chemicals
Page 14
Total Estimated Annual Cost Subtotal = $275,538.10
Invoicing
Once per month, Nalco will calculate the total usage of chemical for the site and issue one
Invoice per month.
Price Adjustment Policy
In June 2026, and each June following, the product, analytical, and service prices will be reviewed.
Any adjustments will become effective the following July 1st.
The following price adjustment formula will be used for specialty chemicals and services, with
an allowed price adjustment range no higher than 7% and no lower than 2%.
% Price Adjustment = 40% Labor + 60% Chemical, where
Labor = NAICS Employment Cost Index (CIU2010000000000I)
Chemical = 55% PCU325 +
20% WPU061 +
15% WPU067905 +
10% WPU061303
.
.
Item 8 Page 31 of 46
Proposal for Water Treatment
Services and Chemicals
Page 15
Commodity chemistry pricing is adjusted on a quarterly basis based on actual costs from the
supplier.
Extraordinary Inflationary Disruption
Product Pricing Hardship – Contractor may temporarily increase the prices for the products or
services if, at any time during the term of this agreement, an Extraordinary Inflationary Disruption
occurs. Extraordinary Inflationary Disruption is defined as an increase in raw materials, freight,
labor, or energy costs beyond the control of Contractor of (7%) percent and sustained over a
three-month period. Any price change will take effect on the fourth month. If Nalco Water’s cost
decrease below the (7%) threshold sustained over a three-month period, pricing will return to
previously maintained pricing in the fourth month prior to the hardship price.
• Contractor will provide the Owner the following hardship detail:
o Product(s)/package(s) affected
o Original Price/New Price
o %Cost Change
o Raw material or material family causing cost change
The City of Vernon will have a 30 day grace period to allow review and approval by City Council.
Service Plan Overview
MGS has unique needs for water chemistry engineering and operational support based on the
complexity of the water systems, site and environmental design requirements, and the
experience and size of the operating staff. Nalco Water recognizes the support needs, and
developed a detailed service plan based on the goals and objectives of MGS and the City of
Vernon.
Our service will include:
• An Annual Risk Management meeting to review onsite chemicals and the associated
personnel and environmental exposure risks.
• Safety, Health, and Environmental communications as required including updating soft
copies of SDS and Product Bulletins and the review and update of any other SH&E
communications as needed. All site personnel with Ecolab3D accounts have on-line
access to the Nalco SDS library.
• Documentation and training of program specifications to ensure safe application of the
chemicals provided. Soft copies of product descriptions, proper product dosage,
methods to calculate or monitor dosage, and environmental limits will be provided and
updated at least annually.
• Emergency response during chemical transit, chemical spills, or other treatment process
and uses. No less than two (2) emergency contacts and a 24-hour emergency response
number will be provided.
.
.
Item 8 Page 32 of 46
Proposal for Water Treatment
Services and Chemicals
Page 16
• A System Survey will be provided describing chemical application points, water
treatment processes and uses, and water flow diagrams will be provided. This survey
will also include a one-line diagram of the whole-plant water system labeling all major
equipment and chemical injection points.
• A People Survey will be provided describing plant contacts, responsible reporting
parties, and vendor contacts. This list will be updated annually.
• A Program Administration Manual (PAM) will be provided that includes an overview for
each treatment system, chemical program and product descriptions, feed points, target
concentrations, control and troubleshooting guidelines. Both hard and soft copies of the
PAM will be provided and updated at least annually. Nalco has worked with site
personnel to keep your detailed commissioning program description up to date as we
have completed operator training and made program adjustments.
• Written personal service reports (PSR) for each site visit will be provided describing
services performed, problems found, actions taken, recommendation for the plant, and
planned follow-up. For more information see Nalco’s Six Service Standards section
below.
• A Service Plan will be provided describing the frequency of site visits, specific services
to be performed during each visit, and the frequency of recurring service items.
.
.
Item 8 Page 33 of 46
Proposal for Water Treatment
Services and Chemicals
Page 17
NALCO SERVICE PLAN
Service Component Weekly
Daily
Twice a
Month Quarterly Yearly As
Required Ongoing
Annual Business Review
Nalco
Update of People Survey Nalco
Personal Service Reports & Updates Nalco
Automated 3DTrasar and EData Report Nalco
Update-Plant Survey & Operations Nalco MGS
Nalco
Program Administration Manual Nalco
Update of Annual Service Plan MGS
Nalco
Routine Service Calls Nalco
Boiler Water System Testing MGS Nalco
Cooling Water System Testing MGS Nalco
Legionella Testing Nalco
Deposit Analysis Nalco
Corrosion Coupon Analysis Nalco
Equipment Inspections with
Photographs Nalco
Inspection & Calibration of Feed
Systems Nalco MGS
Inventory of Test Reagents and Test
Kits MGS
Metallographic Analysis Nalco
Operator Training (Chemical Safety) Nalco
Operator Training (System Operation) Nalco
Recommendations for System Control Nalco Nalco
Review of Treatment Logs MGS Nalco MGS
Treatment Chemical Inventory MGS Nalco
Microbial Testing Nalco Nalco
.
.
Item 8 Page 34 of 46
Proposal for Water Treatment
Services and Chemicals
Page 18
• An annual business review will be conducted documenting the total value of all goods
and services consumed, the estimated expenditures for the coming year, a summary of
projects completed and supporting data for any cost savings achieved, and technical
and financial goals for the coming year. Soft copies of this review will be provided.
• Inspection of water and steam system during operation and outages will be provided. A
written report detailing equipment status and recommendations will be supplied within 4
weeks of any inspection, but is usually provide the same day as the inspection with
pictures and text. Nalco will meet with plant personnel at least monthly to determine the
need for inspections in the following month.
• Water and deposit analysis will be performed at Nalco’s analytical laboratory and
specified in the RFP and as needed to verify the proper operation of our chemicals and
services. Sample containers will be provided, and a written analysis and sample results
will be provided within four weeks of the sample date.
• Metallographic analysis can be performed at the Nalco Water Analytical Laboratory to
ensure proper operation of the Nalco provided chemistry and services. Written analysis
and sample results will be provided within 4 weeks of the sample date.
• Laboratory procedure and training will be provided to ensure proper performance of
chemical tests required to ensure proper application of Nalco chemicals and services.
Training can be provided annually and will consist of a single pre-scheduled laboratory
procedures demonstration where a Nalco representative will meet with available plant
operators to perform wet chemistry and demonstrate the proper wet test procedures.
Documentation will be provided showing the persons trained, date, and time. A soft
copy of training materials will be provided.
• Visual inspection for each chemical feed, control, and storage system will be provided at
least annually. This inspection will identify any necessary repairs or safety issues and
that SDS are properly updated for each storage tank. Recommendations will be provided
concerning feed and control system improvements. A soft copy of this report will be
provided.
• Nalco will provide monitoring, control, and corrective actions for plant water systems.
This service will include a review of log sheets and trends for plant water streams or
systems for data provided. Recommendations for improvement will be provided for any
parameter with less than 80% of readings within the target range. A soft copy will be
provided.
• Nalco will provide detailed chemistry evaluations and recommendations for each
system’s chemical treatment program. Nalco will review the treatment program design,
purpose, and efficacy; compare chemical treatment program goals to results; and A soft
copy copies will be provided.
.
.
Item 8 Page 35 of 46
Proposal for Water Treatment
Services and Chemicals
Page 19
• Provide corrosion rate monitoring of recirculating, and closed loop cooling systems.
Corrosion coupon results will be maintained in a Nalco supplied database and made
available to the plant at least quarterly. Reports shall include both general and pitting
corrosion rates. Coupon exposure time shall be approximately 90 days. A soft copy of
all reports will be provided.
• In-service inspections of the MGS evaporative cooling tower will be performed at least
twice per year. The MGS cooling tower is routinely given a visual inspection during each
service visit. Any anomalies will be noted in the service report as a soft copy email to
site personnel. As noted, a soft copy of this report will be provided.
• Annual training will be provided for operators, supervisors, and managers as requested
by MGS management. It will be provided on basic water chemistry, cooling systems,
HRSG systems, and pre-treatment systems. Other topics as determined by site
management are also appropriate, including the Nalco on-line E-data system and the
on-line eCommerce system. Training will include at least two different training sessions
covering the same material to accommodate shift schedules, however we have been
most successful when conducting the same training over four (4) successive weeks to
reach all four shifts when on their day rotation. Training material and records will be
provided in an electronic formats. Hard copy documents appropriate to the training topic
may be provided as a appropriate for each training topic,
• Onsite emergency response during normal working hours: Nalco will provide no less
than less than two (2) emergency contacts and a 24-hour emergency response phone
number.
• Provide chemistry data trending software capable of importing existing plant data to
ensure previous historical data is retained: Nalco’s E-data system has been in service
for close to (5) years for some systems. The E-data logs can be exported to Excel and
off-line Excl log sheets generated by E-data can be used to upload off-line data back to
E-data.
• Provide recirculating, and closed loop cooling system biological control monitoring
including sessile bacteria counts, bacteria metabolic residuals and bacteria speciation
analysis at least quarterly. Reports shall include recommendations for improvements,
cost analysis of biological treatment programs, and evaluation of current program
efficacy. Electronic reports including speciation analysis shall be provided to the plant
quarterly.
• Quarterly reporting of all corrosion data will be included in the corresponding monthly
report.
• Annual reports will include Business Reviews, chemistry evaluations, and chemical
safety audits in the corresponding monthly report.
• Special reports will include outage inspection of water and steam systems, deposit
samples, specially requested water samples, metallographic analysis, and training
presentations.
.
.
Item 8 Page 36 of 46
Proposal for Water Treatment
Services and Chemicals
Page 20
Action Link Emergency Response Team
1 – 800 – 424 – 9300
EMERGENCY NUMBER
24 HOURS/DAY
The Nalco Water ALERT Emergency Response System was created to minimize the
human and environmental impact of all incidents involving Nalco Water products, and
to work to prevent future incidents. The Distribution Safety Department is
responsible for the management of the Nalco Water ALERT System. Distribution
Safety is also responsible for responding to all distribution and transportation
emergency incidents. * Nalco Environmental Health & Safety Toxicologists respond
to all medical exposures involving our products.
*A transportation emergency is any occurrence, which results, or is likely to
result, in an uncontrolled release of product while a shipment is loading, in
transit, or unloading.
In case of an emergency, a special number is printed on shipping papers, product
labels, and Material Safety Data Sheets: 1-800-424-9300. A call to that number
activates the ALERT Emergency Response System.
Nalco Customer Delivery Specialists, common carriers and all other parties involved
in the management of the distribution channel are instructed to call the emergency
number in the event of a leaking container or spill. Notification of an incident to the
ALERT System is mandatory regardless of the quantity involved or if the product is
hazardous or non-hazardous. (Delivery Specialists are not trained to aggressively
stop or clean up major spills; however, if it is safe to do so, they will secure the scene
and take limited containment action.)
When a call comes in, the Control Center obtains preliminary information, instructs
the caller to stand by, and notifies the Emergency Response Coordinators (ERCs) in
Distribution Safety.
ERCs are divided into three groups and are on-call 24 hours a day, seven days a
week. In an emergency, the Control Center first pages ERC Group A. If Group A
does not respond within five minutes, the Control Center will contact Group B. If the
.
.
Item 8 Page 37 of 46
Proposal for Water Treatment
Services and Chemicals
Page 21
Control Center is unable to reach Group B within five minutes, they will proceed to
Group C, again by telephone contact. Since 1995, ERC Group A has responded to
over 2,900 incidents. During that same time period, only two incidents have gone on
to be responded to by ERC Group B.
ERCs are the primary decision-makers in an emergency. The methodology used by
the ERC is a disciplined approach to minimize the human and environmental impact
of the incident. Once the Control Center contacts an ERC, he or she is provided with
preliminary information. The ERC then contacts the caller to obtain more details and
proceeds to develop an action strategy. When necessary, the ERC coordinates
Nalco Water or carrier emergency response teams, contractors, and civil authorities
to begin recovery operations. The ERC has cradle-to-grave responsibility for the
incident and ensures that all parties involved handle the incident appropriately.
The ERC may also arrange an on-site remediation response if the incident involves
the company fleet, if civil authorities request Nalco Water to respond on-site, or if a
common carrier is unable to arrange remediation. These efforts may or may not
include a Nalco Emergency Response Team (ERT).
Nalco Emergency Response Teams conduct on-site cleanup, remediation and
recovery. They are available only at Nalco Water plant locations. The facility
manager is responsible for making the final decision on mobilizing an ERT.
If a company ERT is not able to respond to an emergency, the ERC will hire an
emergency response contractor. Distribution Safety maintains a special list of
contractors for this purpose. The ERC may also contact CHEMTREC (Chemical
Transportation Emergency Center), for a referral. CHEMTREC is a service
established by the American Chemistry Council (ACC).
Because Nalco Water is also a subscriber to CHEMNET, a CMA mutual aid network,
Nalco Water can request assistance from a chemical company that is near the scene.
The ALERT System also processes calls on medical emergencies and customer
incidents that involve Nalco Water products.
.
.
Item 8 Page 38 of 46
Nalco Company LLC
Services Agreement
Page 20 of 24
______________________
EXHIBIT B
SCHEDULE
.
.
Item 8 Page 39 of 46
Proposal for Water Treatment
Services and Chemicals
Page 13
Chemical Treatment Program Summary
Program Pricing
Nalco proposes to provide both Nalco Specialty Chemicals, along with the commodities of Sodium
Hypochlorite and Sulfuric Acid for use in the water treatment systems.
The pricing for the Nalco Specialty Chemicals is set for the following 12 months. See section
below on Pricing Adjustment Policy for how adjustments are made to these products.
The pricing for the commodity chemicals is set for 3 months and is evaluated every quarter based
upon commodity chemistry pricing available to Nalco. Nalco does a rigorous job of selecting and
negotiating for commodity chemistry but the chemical prices for these products can be much more
volatile than the Specialty Chemicals produced by Nalco. Commodity pricing can go up or down
on a quarterly basis depending on market trends.
It should be noted that total expenses for the MGS operation are directly tied to the run rates of
the power plant operation. In this proposal, the average run rate of 2023 and 2024 were used to
calculate expected total cost. If the run rate should be reduced significantly, the City of Vernon
should expect the expenses to drop significantly as well.
All other services, as described in the Service Plan, are included in this offering at no additional
cost to the City of Vernon.
.
.
Item 8 Page 40 of 46
Proposal for Water Treatment
Services and Chemicals
Page 14
Total Estimated Annual Cost Subtotal = $275,538.10
Invoicing
Once per month, Nalco will calculate the total usage of chemical for the site and issue one
Invoice per month.
Price Adjustment Policy
In June 2026, and each June following, the product, analytical, and service prices will be reviewed.
Any adjustments will become effective the following July 1st.
The following price adjustment formula will be used for specialty chemicals and services, with
an allowed price adjustment range no higher than 7% and no lower than 2%.
% Price Adjustment = 40% Labor + 60% Chemical, where
Labor = NAICS Employment Cost Index (CIU2010000000000I)
Chemical = 55% PCU325 +
20% WPU061 +
15% WPU067905 +
10% WPU061303
.
.
Item 8 Page 41 of 46
Proposal for Water Treatment
Services and Chemicals
Page 15
Commodity chemistry pricing is adjusted on a quarterly basis based on actual costs from the
supplier.
Extraordinary Inflationary Disruption
Product Pricing Hardship – Contractor may temporarily increase the prices for the products or
services if, at any time during the term of this agreement, an Extraordinary Inflationary Disruption
occurs. Extraordinary Inflationary Disruption is defined as an increase in raw materials, freight,
labor, or energy costs beyond the control of Contractor of (7%) percent and sustained over a
three-month period. Any price change will take effect on the fourth month. If Nalco Water’s cost
decrease below the (7%) threshold sustained over a three-month period, pricing will return to
previously maintained pricing in the fourth month prior to the hardship price.
•Contractor will provide the Owner the following hardship detail:
o Product(s)/package(s) affected
o Original Price/New Price
o %Cost Change
o Raw material or material family causing cost change
The City of Vernon will have a 30 day grace period to allow review and approval by City
Council.
.
.
Item 8 Page 42 of 46
Nalco Company LLC
Services Agreement
Page 21 of 24
______________________
EXHIBIT C
EQUAL EMPLOYMENT OPPORTUNITY
PRACTICES PROVISIONS
A. Contractor certifies and represents that, during the performance of this Agreement,
the contractor and each subcontractor shall adhere to equal opportunity
employment practices to assure that applicants and employees are treated equally
and are not discriminated against because of their race, religious creed, color,
national origin, ancestry, handicap, sex, or age. Contractor further certifies that it
will not maintain any segregated facilities.
B. Contractor agrees that it shall, in all solicitations or advertisements for applicants for
employment placed by or on behalf of Contractor, state that it is an "Equal
Opportunity Employer" or that all qualified applicants will receive consideration for
employment without regard to their race, religious creed, color, national origin,
ancestry, handicap, sex or age.
C. Contractor agrees that it shall, if requested to do so by the City, certify that it has
not, in the performance of this Agreement, discriminated against applicants or
employees because of their membership in a protected class.
D. Contractor agrees to provide the City with access to, and, if requested to do so by
City, through its awarding authority, provide copies of all of its records pertaining or
relating to its employment practices, except to the extent such records or portions of
such records are confidential or privileged under state or federal law.
E. Nothing contained in this Agreement shall be construed in any manner as to require
or permit any act which is prohibited by law.
.
.
Item 8 Page 43 of 46
Nalco Company LLC
Services Agreement
Page 22 of 24
______________________
EXHIBIT D
LEGIONELLA ANALYTICAL/TESTING SERVICES
1. Analytical
a) Culturing and testing procedures require up to 14 days for confirmation and reporting of
test results.
b) All test samples will be submitted to the Contractor Lab which holds the appropriate
certifications for performing analytical services and Legionella culture testing (CDC-
ELITE, ISO 9001:2008, QWAS-LGC, UKAS-PHE).
c) Legionella testing will be performed per the International Organization of Standardization
ISO method 11731 or an equivalent method.
d) The Lab can detect Legionella at a limit of 0.1 Colony Forming Units per Milliliter
(CFU/mL).
e) The Lab reserves the right to process a water sample at a different detection limit due to
limitations caused by water sample quality such as turbidity or other contaminants that
would prevent a sample from being processed at the detection limit requested.
f) Analytical results are reported as follows: Total Legionella (all species), Legionella
pneumophila Serogroup 1, Legionella pneumophila Serogroups 2-14 (combined), Other
Legionella species (all non-pneumophila species), Fluorescent Legionella (reported if
detected).
2. Sample Submittal
Test samples will be shipped by overnight courier using the Lab provided test kits. The Lab
is closed on Saturdays, Sundays, and Holidays. Therefore, test samples cannot be
collected/shipped on Fridays or the day before a holiday.
3. Test Reports
Analytical results will only be reported electronically via email to designated City contacts.
4. Terms of Service
a) Contractor recommends that Legionella analytical testing be performed and interpreted
within the context of a properly designed Legionella or Waterborne Pathogen Water
Safety Plan or equivalent.
b) The City understands and acknowledges they have sole responsibility for interpretation
of test results and for responding and taking corrective action for any detectable species
of Legionella.
c) Unless mutually agreed in a separate written service contract signed by authorized
Contractor and the City representatives, Contractor is not responsible for any corrective
action to remediate or respond to any detectable species of Legionella.
.
.
Item 8 Page 44 of 46
Nalco Company LLC
Services Agreement
Page 23 of 24
______________________
EXHIBIT E
CONTRACTOR-OWNED EQUIPMENT TERMS AND DIGITAL PROGRAM TERMS
Contractor-Owned Equipment Terms
For equipment (including Porta-Feed units, 3D TRASAR, OMNI, Purate, and Pareto
equipment and other proprietary equipment of Contractor and any associated computer
hardware or software) furnished to City on a rental or use basis (the “Equipment”), the
following terms and conditions shall also apply.
1. Equipment shall remain the sole personal property of Contractor even though City
may attach Equipment to realty. Contractor may cause such Equipment to be
marked to indicate its ownership. City shall take no action which is inconsistent with
Contractor’s title to the Equipment, and shall not move, encumber or alter the
Equipment without Contractor’s written authorization. City shall be responsible for
any personal property or use taxes associated with the Equipment.
2. City shall not use the Equipment with any materials or products other than those
recommended or approved by Contractor. The proper functioning of the Equipment
is conditioned upon City operating it in accordance with Contractor’s
recommendations.
3. City shall install and provide the utilities necessary for the Equipment, and will
provide a suitable location for the Equipment, including but not limited to shelter,
tank pads, spill protection, foundations, etc., as appropriate. City shall receive,
unload, place and remove Equipment at no cost to Contractor and should be
responsible for procuring any necessary permits or licenses for such actions. With
respect to Porta-Feed units, City agrees to provide access for a standard truck (min.
40 feet end-to-end, 14 feet high) to be driven safely to an area (e.g. loading dock) in
the vicinity of the base tank to offload refill units.
4. City shall not alter the Equipment without Contractor’s written authorization. City
assumes all risk of loss or liability arising from or pertaining to its possession,
operation or use of the Equipment, and shall indemnify, defend and hold Contractor
harmless from all losses, claims, damages and expenses arising from City’s
possession and use of the Equipment except to the extent damage to the Equipment
is caused by Contractor’s negligence or willful misconduct. City shall obtain and
maintain for the term of this Contract all risks property insurance against loss or
damage to the Equipment.
5. Upon City’s written authorization, which shall not unreasonably be withheld, City
mayl allow Contractor to subcontract portions of work to be performed under this
.
.
Item 8 Page 45 of 46
Nalco Company LLC
Services Agreement
Page 24 of 24
______________________
Contract with respect to Equipment including but not limited to data -hosting,
transmission of data through internet service providers and use other service
providers. Contractor shall have the right to inspect and service Equipment during
normal City business hours.
6. Upon termination of this Contract by either Contractor or City, City shall return
Equipment to Contractor at City’s sole expense in the same condition as received,
ordinary wear and tear excepted. In the event Equipment is lost, damaged or
destroyed, City shall pay to Contractor the cost of replacement, or of repair at
Contractor’s standard charges then in effect, unless such loss or damage is
attributable to the negligence or willful misconduct of Contractor . During the term of
this Contract, the Equipment will remain the exclusive property of Contractor.
7. City shall promptly notify Contractor of any material change in City’s status,
including, but not limited to, change of address, desired Equipment location, close of
business.
8. Contractor reserves the right to use non-union labor for supervised, installation,
testing and service of Equipment.
9. City agrees to inform Contractor of any special or unusual safety precautions that
should be taken because of conditions in City’s plant or process.
Digital Program Terms
Ecolab Digital Program(s) and the software, websites, mobile applications, or other
interactive properties through which the Ecolab Digital Program is delivered
(collectively, the “Program”) are subject to the Digital Program General Terms and
Conditions, including Ecolab’s Data Processing Agreement incorporated herein by
reference and available at https://www.ecolab.com/ecolab3dtandc (the “Digital
Terms”). To the extent of any conflict between the Digital Terms and this Agreement,
the Digital Terms will govern regarding any technical and legal aspects of the platform
usage, but the commercial terms (term/subscription fee) of this Agreement will govern
regarding all other aspects including usage of the Program.
.
.
Item 8 Page 46 of 46
City Council Agenda Report
Meeting Date:July 1, 2025
From:Genoveva Rocha, City Clerk
Department:City Clerk
Submitted by:Yonnie Parker, Deputy City Clerk
Subject
Commission and Committee Appointments
Recommendation
A. Appoint two (2) Vernon Area Representatives and one (1) Council Member Representative to
full four-year terms (July 1, 2025 to June 30, 2029) to the Vernon CommUNITY Fund Grant
Committee;
B. Appoint one (1) Business Representative, one (1) Resident Representative (non-City Council
Member), and one (1) Resident Representative (City Council Member) to full four-year terms
(July 1, 2025 to June 30, 2029) to the Vernon Housing Commission;
C. Appoint one (1) Vernon Business Representative to a partial term (July 1, 2025 to June 30,
2026) to the Green Vernon Commission; and
D. Direct the City Clerk to continue recruitment efforts until all Commission and Committee vacant
seats are filled.
Background
The City has several Commission and Committees established by Ordinance that serve to advise
the City Council on policy matters or review specific issues and carry-out assignments as
requested by the Council or prescribed by law. Pursuant to Title 2 of the Vernon Municipal Code,
the City Council has the pleasure of making appointments to each body. Appointments to fill the
current vacancies will comply with the requirement of the Code to provide for staggered terms
on each Commission. Except for City Council Members, serving members may receive a stipend
of $100 per meeting, up to a maximum of $200 in any calendar month.
Currently, there are vacancies on the Vernon CommUNITY Fund Grant Committee, the Vernon
Housing Commission, and the Green Vernon Commission. The recruitment began in April to fill
scheduled (term expiration) and unscheduled (resignation) vacancies and was widely advertised
on the City’s website and social media outlets as well as distributed through the Vernon Chamber
of Commerce. The due date to submit an application was extended twice aiming to reach a
greater number of potential candidates and, on May 27, the due date was updated to sustain the
recruitment until all vacant seats are filled.
VERNON COMMUNITY FUND GRANT COMMITTEE (VCFGC) serves to improve the quality of
life for the Vernon Area by awarding student scholarships and grants to charitable and
governmental entities for projects and programs that benefit those who live, work, and attend
school in Vernon and its surrounding communities.
The Committee consists of seven members: One representing member of the California
Legislature; four Vernon Area Representatives that reside or work in the Vernon area; one
Business Representative who represents the owner or operator of a business located in Vernon;
and one current City Council Member. Each member serves a four-year term, and the Committee
meets on the 3rd Wednesday in May and November at 10:00 a.m.
Three (3) Vernon Area Representative seats and one (1) Vernon City Council Member seat .
.
Item 9 Page 1 of 3
expired on June 30, 2025. During the recruitment to fill the scheduled vacancies, one (1) Vernon
Area Representative seat was resigned in May, vacated earlier than the term expiration. The
unexpired seat was posted pursuant to regulations outlined in Government Code Section 54974.
The following candidates are presented to the City Council for appointment consideration:
Two (2) Vernon Area Representative seats (full 4-year terms July 1, 2025 – June 30, 2029)
•Steven Froberg is a current representative and is eligible to serve a second term
•Frank Gaviña is a current representative and is eligible to serve a second term
One (1) Resident Council Member (full 4-year term July 1, 2025 – June 30, 2029)
•Council Member Lopez is a current representative and is eligible to serve a second term
Upon appointment of Area Representatives, vacant seats will remain. Therefore, the City Clerk
will continue recruitment efforts to fill vacancies until such time the Committee has seven seated
members.
VERNON HOUSING COMMISSION (VHC) makes decisions regarding leasing, market rental
rates, repair and maintenance and offers recommendations to the City Council on potential
divestment and development opportunities.
The Commission consists of seven members: Three Vernon Residents, one of whom shall be a
member of the City Council; three Vernon Business Representatives that own or operate a
business in the City; and one Business Employee. Each member serves a four-year term, and
the Commission meets on the 2nd Wednesday each quarter in the months of March, June,
September, and December at 6:00 p.m.
One (1) Vernon Business Representative seat, one (1) Vernon Resident Representative seat,
and one (1) Vernon Resident Council Member seat expired on June 30, 2025. The
following candidates are presented to the City Council for appointment consideration:
One (1) Vernon Business Representative (full 4-year term July 1, 2025 through June 30, 2029)
•Jacquie Cabrera
•Frank Gaviña
One (1) Vernon Resident Representative (full 4-year term July 1, 2025 through June 30, 2029)
•Ulisses Sanchez
•Dora Douglas
•Sandra Solorzano
One (1) Resident Council Member (full 4-year term July 1, 2025 through June 30, 2029)
•Council Member Lopez is a current representative and is eligible to serve a second term
GREEN VERNON COMMISSION (GVC) reviews the City’s Sustainability Action Plan and
provides a forum for addressing the public’s concerns relating to sustainability and energy
efficiency issues.
The Commission consists of seven members: Three Vernon Business Representatives; two
Labor Representatives; and two Environmental Representatives engaged in the advancement of
environmental and sustainability issues. Each member serves a four-year term, and the
Commission meets on the 3rd Wednesday each quarter in the months of March, June,
September, and December at 3:30 p.m.
One (1) Vernon Business Representative seat (partial term July 1, 2025 through June 30, 2026). .
.
Item 9 Page 2 of 3
was resigned, vacated earlier than the term expiration, and was posted pursuant to regulations
outlined in Government Code Section 54974. The following candidates are presented to the City
Council for appointment consideration:
•Jacquie Cabrera
•Frank Gaviña
Fiscal Impact
There is no fiscal impact associated with this report.
Attachments
1. Notice Inviting Applications
2. Notice of Unscheduled Vacancy
3. Recruitment Flyer
4. Applications Received Chart
5. VCFGC Applications
6. VHC Applications
7. GVC Applications
8. Current Members Local Appointment List
.
.
Item 9 Page 3 of 3
REVISED NOTICE INVITING APPLICATIONS FOR APPOINTMENT TO
COMMISSIONS AND COMMITTEES
The City of Vernon is accepting applications for appointments to the following Commissions and
Committees:
CommUNITY Fund Grant Committee
One (1) Vernon Area Representative – Partial Term through June 30, 2026
Three (3) Vernon Area Representatives – Full Term through June 30, 2029
Housing Commission
One Business Representative – Full Term through June 30, 2029
One Vernon Resident – Full Term through June 30, 2029
Green Vernon Commission
One Business Representative – Partial Term through June 30, 2026
Information on each commission/committee and the application is available on the City’s website at
http://www.cityofvernon.org/BoardAppointments or through the City Clerk Department at
cityclerk@cityofvernon.org or (323) 583-8811, ext. 546.
Appointments will be made at the City Council meeting on June 3, 2025. Applications must be received
by May 27, 2025, to be considered for appointment.
Post: May 14, 2025
Genoveva Rocha, City Clerk
.
.
Item 9 Page 1 of 1
CITY OF VERNON
NOTICE OF UNSCHEDULED VACANCY
(Government Code Section 54974)
VACANT POSITION PREVIOUS INCUMBENT APPOINTMENT DATE
Vernon CommUNITY Fund Grant
Committee Clara Gazcon June 3, 2025
Green Vernon Commission Clara Gazcon June 3, 2025
Interested persons should contact the City Clerk Department at (323) 583-8811, ext. 546 or
by email at cityclerk@cityofvernonca.gov for more information.
Posted: May 13, 2025
Genoveva Rocha, City Clerk
.
.
Item 9 Page 1 of 1
Applications for the following City of Vernon Commissions
and Committees are being accepted continuously until filled
Green Vernon Commission
One (1) Business Representative – Unexpired Term through June 2026
The Green Vernon Commission reviews the Sustainability Action Plan and provides a forum for
addressing the public’s concerns relating to sustainability and energy efficiency issues.
Vernon CommUNITY Fund Grant Committee
One (1) Vernon Area Representative – Unexpired Term through June 2026
Three (3) Vernon Area Representatives – Term through June 2029
The Committee awards student scholarships and grants to charitable and governmental entities for
projects and programs that benefit those who live, work, and attend school in the Vernon area.
Vernon Housing Commission
One (1) Business Representative – Term through June 2029
One (1) Vernon Resident – Term through June 2029
The Housing Commission makes decisions regarding leasing, market rental rates, repair, and
maintenance of City-owned housing, and offers recommendations to the City Council regarding
potential divestment and development opportunities.
Additional information and applications for each
commission/committee are available on the City’s website at
www.CityofVernon.org/BoardAppointments,
or through the City Clerk Department at
CityClerk@cityofvernonca.gov (323) 583-8811, ext. 546. .
.
Item 9 Page 1 of 1
COMMISSIONS AND COMMITTEES
LIST OF APPLICATIONS FOR APPOINTMENT
July 1, 2025
VERNON HOUSING COMMISSION APPLICANTS
One Business Representative
(Full Term July 1, 2025 - June 2029)
• Cabrera, Jacquie - Business Rep.
• Gavina, Frank – Business Rep.
One Vernon Resident
(Full Term July 1, 2025 -June 2029)
• Sanchez, Ulisses – Resident Rep.
• Douglas, Dora – Resident Rep.
• Solorzano, Sandra – Resident Rep.
GREEN VERNON COMMISSION APPLICANTS
One Business Representative
(Partial Term July 1, 2025 - June 30, 2026)
• Cabrera, Jacquie – Business Rep.
• Gavina, Frank – Business Rep.
VERNON COMMUNITY FUND GRANT
COMMITTEE
APPLICANTS
Three Vernon Area Representatives
(Full Term July 1, 2025 – June 30, 2029)
One Vernon Area Representative
(Partial Term July 1, 2025 -June 30, 2026)
• *Froberg, Steven – Area Rep.
• *Gavina, Frank – Area Rep.
*Current Member; eligible to serve an additional four-year term
.
.
Item 9 Page 1 of 1
.
.
Item 9 Page 1 of 2
.
.
Item 9 Page 2 of 2
ATIFOTNIA
mUNITY Fund Grant Committee as
Qausiness Representalive
sim Commission as
Business Representative
n Vernon Commission as
usiness Representative
COMMISSION AND COMMITTEE APPLICATION
ernon Area Representative
Emdoyee of Vemon Business O aesioent
Environmental Representative QLabor Representative
NON
Canmission/Committee (select all of interest)read back of form for qualifications and meeting inlormation
Nun," JACQUIE CABRERA
Residence Address:
DIRECTOR OF HUMAN RESOURCES . ROSE & SHORE, INC.Employer
EmployerAddress 515l ALCOA AVE' VERNON' CA' 90058
Email:JCABRERA@ROSE-SHORE.COM Phone
eualifications and Reasons for lnterest in Serving on a Commission / Committee (attach addilional sheet if
necessaryf
By signing below, I affitm that I meet the requirements of the appointing categoty -! !"'11!1":1".9 I affirm that
iiirr ire a"state-ent of Economic lnrerests Form 700 and complete the required z-ht AB12u Ethics Training
within 30 da iving noticB of appointrnent to a Commissaon?Date: OS ??70signatu
citYcl erk@ci wofvern o nca.oov or lllall to Cl ty Glerk Dopartment, 4305 Santa Fc Avenue'
For oliica Use OntY
5-22€
d"fm ERear E ELabor 0 Envitonmental E Vernon Area D Emp'oyBo EResident
Vernon, CA 9fi158.
REC :IVED
clw oF GRroUfl('S 0FFICE
lausiness and lndustn Cdnmission as:
-$r.in.r, R"pr"r"nt tir. Ohea esrate Professional Q-auor neprcsentative
e
Occupation:
Email to
Qualifications conlinpd bY
.
.
Item 9 Page 1 of 8
Cornmissiory'Committee (see page 2 for qralifications):
and lndusby Commission a a:
Business Representative Qnear
lTY Fund Grant C.ommittee as a:
$usines s Representative
Name: Dora M. Dou las
Residence Address:
Occupation:Retired
REC|; iED
MAY I 5 2025
Qrruor Representative
G"*Representative
Qausiness Representative Qv"r* Area Representative
Housing Commission c a:
Qusiness Representative $mgoyee of Vemon Business
I_lcr*n vemon commission as a:
Estate Professirnal
Representative
Employer Address:
NONoRNA
crrY dprugfrni6il0rncE
COMMISSION AND GOMMITTEE
APPLICATION
Emair: vdiorT9 hoo.com Phone:
Qualifications and Reasons for lnterest in SeMng on a Commission / Committee (attach additional
sheet if necessary):
I was responsible for preparing and organizing mortgage loan applications for undenruriting, er
By signing lmeet requirements of the appointing category I have indicated.
sig oare: May 5, 2025
citvclerlr@clWofriernon.oro or tall
Vernon, CA 90058.
City Clerk Department 43Gt Santa Fe
ForffircoUseOnly
Qualffications confimd by oll 5-
nBusiness flnea flLabor E Envionmental E Vemqr Area fl Empnyee desuent
Emall to
AYenue,
Esgfusiaefi Industriaf
Employer:
.
.
Item 9 Page 2 of 8
DORAM. DOUGLAS
City of Vernon, CA
Mortsape Lon Pro cessor
Responsible for preparing and organizing mortgage loan applications for
underwriting, ensuring all necessary documentation is collected, reviewed, and
verified. I acted as a key point ofcontact for borrowers, loan officers, and
underwriters, facilitating the loan process application from beginning to closing.
Kev Resoonsibiliti es:
Gathering and Organizing Documentation:
Collecting and veriffing essential documents like income statements, bank
statements, credit reports, and property details.
Completing Loan Files:
Ensuring loan files are complete and accurate, meeting lender and regulatory
standards.
Communicating with Stakeholders:
Collaborating with borrowers, loan oflicers, and third pa(ies to resolved
discrepancies or obtaining missing information.
Ttacking Loan Progress:
Monitoring loan application and managing deadlines to ensure-timely processing.
Data Entry and Software Proficiency:
Inputting loan information into processing systems and using relevant software.
Ensuring Compliance:
Adhering to federal, state, and local lending regulations and compariy policies.
Preparing for Underwriting:
Preparing loan files for underwriting and assisting with closing procedures.
.
.
Item 9 Page 3 of 8
Troubleshooting:
Identifliing and resolving issues that may delay loan approval or closing.
llla intaining Records :
Keeping detailed records of communication and documentation.
Essential Skills:
o Attention to Detail: Meticulous organization and accuracy in reviewing
applications and documentation.
' Communication and Interpersonal Skills: Effectively communicating with
borrowers, loan offrcers, and underwrites.
. Time Management: Managing multiple tasks and meeting deadlines.
o Problem-Solving: Identifring and resolving issues that may arise during the
loan process.
. Familiarity with Lending Regulations: Understanding and adhering to
relevant federal, state, and local regulations.
. Software Proficiency: Proficiency in using loan processing software and
relevant database systems.
.
.
Item 9 Page 4 of 8
NOtlALIFOTNIA
CITY OF VERNON
COMMISSION AND COMMITTEE APPLICATION
Commission/Committee (select all of interest) read back of form for qualifications and meeting information:
usiness and lndustry Commission as:
usiness Representative al Estate Professional bor Representative
UNITY Fund Grant Committee as
usiness Representative emon Area Representative
ousr ng Commission as:
ployee of Vemon Business On""iusiness Representative dent
n Vemon Commission as
usiness Representalive vironmental Representative OLabor Representative
"".".
Frank Gavina
Residence Address:
Occupation:Executive Employer:Gavina Coffee Company
Employer Address 2700 Fruitland Ave. Vernon CA 90058
fran k.gavi na@gavina.com Phone:
Qualmcations and Reasons for lnterest in Serving on a Commission i Committee (attach additional sheet if
necessary):
I have chaired both the Vernon Housing Commission and the Community Fund Grant Committee c
!
By signing below, I afflrm that I meet the requirements of the appointing category I have indicated. I affirm that
I will file a Statement of Economic lnterests Form 700 and complete the required 2-hr A81234 Ethics Training
within 30 days of receiving notice of appointment to a Commission.
Signature ffiHsi'Ju"o'-n'* ffiffi Date. 5128125
Emall to citvclerk@ciwofvernonca.oov or Mall to Clty Clerk Dopartment, 4305 Santa Fe Avenue,
Vernon, CA 90058.
Q ualifi cations conli med by Yonnie Parker
For Olflce Use Onty
on 5t29t2025
EBuslness EReal Estate fltabor E Envlronmental E Vemon erea E EmPloyoo EResldent
Email:
.
.
Item 9 Page 5 of 8
and lndustry Commission as a:
Business Representative
NITY Fund Grant Committee as a:
QBr"ir."" Representative Vemon Area Representative
Housing Commission as a:
$usiness Representative of Vemon Business Resldent
Residence Address:
Occupation:
Employer Address . 333 S. Grand Avenue, Suite 3310, Los Angeles, CA 90071
Email: ulisses@centrostrategies.com Phone
Qualifications and Reasons for lnterest in Serving on a Commission / Committee (attach additional
sheet if necessary):
Please review my Statement of lnterest and Qualifications included with this file.
By signing below,I afiirm that I meet the requirements of the appointing category I have indicated
Signature:
Emall to jlgglglXcqg.iqg@ or Mall to Clty Clork Department, 4305 Santa Fe
Avenue, Vernon, CA 90058.
For Olllca Use Onty
on 5-2?-K-
ELabor fl Envlronmontal E vomon Arer E Employee #esuent
NONALIFORNIA
A?R'I V LUIX
ctw oF vE
COMMISSION AND
RilGlN rrii'c nrcrnr
SUilrhhltlEE "'
APPLICATION
In[ustriaf
RECEIVED
Commission/Committee (see page 2 for qualifications):
QnealEstateProfessionaf Qf-aborRepresentative
Z
Qemptoyee
ncr."n V".on Commission as a:
$usiness Representawe
Name. Ulisses Sanchez
QEnvironmental Representative Q-aborRepresentative
Employer:Centro Strategies LLC
Date:4t28125
Qualiflcelons conltrmed by
!8u3lne3s EReal
.
.
Item 9 Page 6 of 8
Statement of lnterest and Oualifications
Vernon Housing Commission
Ulisses Sanchez
As a resident at 3560 E. Vernon Avenue, I humbly submit my Statement of lnterest and
Qualifications for the Vernon Resident slot in the Vernon Housing Commission. lt is my desire to
serve on the Vernon Housing Commission as lbelieve that lcan contribute during this time
critical period in which the City will be making decisions that are aligned with its goals of growth
that incorporate strategic opportunities which will include residential and business development.
Through my professional experience - working in local and state government along as a business
owner who has consulted on various housing development projects - I have been able to witness
first-hand how access to housing serves as lhe fundamental building block to any sustainable
community. One key example is my work on the Weingart Center's Weingart Tower'l and 2 in
Skid Row, which include over 400 units of housing with a mix of permanent supportive housing
and affordable housing aimed at helping veterans within our community. ln this project, I
oversaw the community outreach efforts and assisted with the entitlement process with the
developer and non-profit partner with the City of Los Angeles. lt is a project that all of us involved
are very proud of as it was built with the intent of bringing an attraclive construction model that
incorporated innovative architectural designs that are seen more often in major market rate
developments. We knew that being proud of one's home uplifts residents and that goal was
achieved, setting a new standard for housing developments throughout Los Angeles.
When you begin to incorporate mixed-use development strategies, you begin to include
amenities that are essential for any area to grow as a community, let alone begin to feel like one.
Exploring opportunities that will allow for the inclusion of businesses that are essential to building
healthy communities (such as markets, restaurants and general goods) is something that lhope
to be involved with through the Commission, providing input and be engaged in a manner where
my contribution will serve as a real benefit to those who call Vernon home and serve as an
attraction to those who explore the City of Vernon's new housing opportunities.
Recently, I had the honor to serve on the City of Vernon's Rebranding Steering Committee, which
allowed me to engage with city staff and other stakeholders on how we see our city and how we
wish to represent our city to others - from those who are familiar with the city to those who are
new to the city. One key message that I walked away with from this experience was that the City
of Vernon is ready to go in a new direction. away from the motto "exclusively industrial".
Ultimately, we saw that in the logo and the tagline we selected - "lndustry I community I
lnnovation" - which the Council voted and adopted during the March 4th Council meeting.
Being a member of the City's Housing Commission will allow me to be a part of the City's efforts
to iniorporate that mission and that vision. lt is a role that lwillfully and wholeheartedly will do,
ensuring that my time on the Commission is one seen as a productive term that helped the City
of Vernon move forward.
I thank you for your time and consideration.
.
.
Item 9 Page 7 of 8
REcETvED
MAy)1 2125
ALI'OINIA
ITY Fund Granl Committee as
Repres€ntalive ernon Area Representalive
Name:
Gmpnyee or vemon Business ERoia"nr
n Vemon Csnmission as
usiness Representative Gnrironrrent"tRepresentative OLaborRoprcrnratvc
lo^d*o 3. .lolorro', o
COMMISSION AND COMMITTEE APPLICATION
r,i,.: c;F/c[
CITY OF VERNON
Occupation
Email
Je 0**(
-Emproyer
tt'\o
L
es,,C4
loors
Phone
Qualillcations and Reasons for lnterest in Servhg on a Commission / Committec (attach additional sheet if
neoessary): tJ a,ra.r.a po.1l e4 v*n L;tLl Oe4 n*b-- , W ^.t
W*r^ k)iuj oL eat' 4o b0u9p' ll o442'.tt"o-o^ alT
bl*'r<+ ; (^ c., fti j\t +;o--' llvt Llo.-, .
Ay signintbebw, I affrm that I me€t th€ r€quiremenb of the appotnting €tegory I have indicated. I affim that
I will filc , Statement of Economic lnter€sts Form 700 and completE the requited Z-hr AB'12% Ethics TrainirE
within 30 days of rec€iving notic. of rppointment to a Commi$ion.
Signature
Emall to cltyclerk@cllvofvemonca.oov or illall to Clty Clerk Dcpartment, 4306 Sama Fe Avenue,
Vernon, CA 90058.
Fot Orric. Usc Only
Oudificatons confrmd by t/onrn P44fu on 14 May 2025
T
l8usrness ERed E$ab OLabor E Ene.onmsnd E v€fnon Arla E Employee pfiesoent
Commlssion/Committee (seloct ell ot lnteres0 read Dak o, form br qualmcations and meetlng lnformatim:
I-brsn"", -o tndustry commrssion as:
Qusiness Repesentative Qeal Estate Probssional QLabor Repreeentative
Ehousinq comnission as
OBr.in"., R.pr"sentative
Residence Address.
Employer Address:
oae, oSl t.z / z ^2.,{
.
.
Item 9 Page 8 of 8
NON
RECEIVED
MAY 2 2 2025
0[lY LL,: , ' '] iilluL
CITY OF VERNON
COMMISSION AND COMMITTEE APPLICATION
a
ALIFORNIA
Cdnmission/Committee (select all of interesl) read back of form for qualificalions and meeling inlormation
siness and lndustry Cdnmission as
usiness Representative OheatEstateProfessional Q-aoorRepresentatlve
UNITY Fund Grant Committee as
Qausiness Representative ernon Area Representative
sing Commission as
Eusiness Representa(ive Oemdoyee ot vernon Business O nesioent
usiness Representative Environmental Representative OLabor Representative
Na.e JACQUIE CABRERA
Residence Address
OIRECTOR OF HUMAN RESOURCES Employer:ROSE & SHORE, INC.
EmployerAddress Sl5l ALCOA AVE, VERNON' CA' 90058
Emait: JCABRERA@ROSE-SHORE.COM phone:
By signing below, I atfirm that I meet the requirements ol the appointing categov I nav-1i191c9te9.. I affirm that
t ri1tt ite jstaternent of Economic lntere$s Form 700 and complete the required 2-ht AB1234 Ethics Training
within 30 da iving notice of appointmenl to a Commission
Sign
DS ??70
Email to citvclerk@ciwofvernonca.qov or tlla ll 1o Clty Clerk Oeparlmcnt, 4305 Sant. Fe Avenue'
Fot Ollica Use only
Ou alificalions confi rogd bY 5'27-zF
{r'flk EReal Es El|.abor E Envrronmental E Vernon Area E Emdoyee EResidenl
Vernon, CA 9005E.
[feen vernon commission as:
at
Occupation:
Oualifications and Reasons for lnteresl in Serving on a Commission / Committee (attach additional sheet if
necessary):
Date.
.
.
Item 9 Page 1 of 2
REGEIVED
MAY 2 I 2025
NOr.lALIFORNIA
CIiY CLERK'S OFFICE
CITY OF VERNON
COMMISSION AND COMMITTEE APPLICATION
Commission/Committee (select all of interest) read back of form for qualifications and meeting information
usiness and lndu stry Commission as:
Sr"in"r"Represenlative GealEstateProfessional QlaborRepresentative
mUNITY Fund Grant Committee as
usiness Representalive emon Area Representative
ployee of Vernon Business Cn""iue nt
en Vemon Commission as
usiness Representative vironmental Representative or Representative
*"r". Frank Gavina
Residence Address:
Occupation:Executive Employer . Gavina Coffee Company
2700 Fruitland Ave. Vernon CA 90058Employer Address:
Email:frank. gavina@gavina.com Phone:
Qualifications and Reasons for lnterest in Serving on a Commission / Committee (attach additional sheet if
necessary):
I have chaired both the Vernon Housing Commission and the Community Fund Grant Committee c
I
By signing below, I afiirm that I meet the requirements of the appointing category I have indicated. I afiirm that
I will file a Statement of Economic lnterests Form 700 and complete the required 2-ht A81234 Ethics Training
within 30 days of receiving notice of appointment to a Commission.
SiEnature:
eb5Losc{b76<!@-e2c8. ffi Date 5t28t25
Emall to clwclerk@cltvofvernonca.oov or Mall to Clty Clerk Departmont, 4305 Santa Fe Avenue,
Vernon, CA 90058.
EResldent
Eqrr,nn commission as:
L)Business Representative
For Olllce Use only
ouatiflcerons confirmro o, Yonnie Parker ",
512912025
vr, F- .v ,1L- Ett ,r-
Eausl#is /flR€al Estal€ E Labor ! Envlronmental E Vemon ArBa E EmPloyee.
.
Item 9 Page 2 of 2
LOCAL APPOINTMENTS LIST
Government Code Section 54972
March 3, 2025
Following are the boards, commissions, and committee appointed by, and serving at the pleasure of
the Vernon City Council.1
BUSINESS AND INDUSTRY COMMISSION
The Vernon Business and Industry Commission consists of seven members including three
individuals that represent the owner or operator of a business located in Vernon; two individuals that
have knowledge of the Vernon real estate market; one individual who is employed by a business
located in Vernon or who is a member of a labor union that represents workers at a business located
in Vernon; and one current member of the Vernon City Council. Members serve four-year terms and
shall serve no more than two full consecutive terms. The Commission’s regular meetings are
quarterly (February, May, August, and November) on the second Thursday at 9:00 a.m. in the Vernon
Council Chamber. (Municipal Code Chapter 2.52)
Appointee Classification Date Appointed Term Expires
Brian Bailey Business Representative June 4, 2024 June 30, 2028
Cathy Browne Business Representative June 7, 2022 June 30, 2026
Duncan Sachdeva Business Representative June 7, 2022 R* June 30, 2026
Melissa Ybarra City Council Representative June 4, 2024 June 30, 2028
Hector Morfin Employee/Labor Rep. June 7, 2022 June 30, 2026
Thomas Condon Real Estate Representative June 7, 2022 June 30, 2026
Paul Sablock Real Estate Representative June 4, 2024 June 30, 2028
CommUNITY FUND GRANT COMMITTEE
The Vernon CommUNITY Fund Grant Committee consists of seven members including one individual
representing members of the California Legislature with a district including a portion of the Vernon
area, four individuals that reside or work in the Vernon area, one Business Representative and one
current Council Member. Each member serves a four-year term and shall serve no more than two
consecutive terms. The Committee meets semi-annually in May and November, on the third
Wednesday at 10:00 a.m. in the Vernon Council Chamber. (Municipal Code Chapter 2.48)
Appointee Classification Date Appointed Term Expires
Ronit Edry Business Representative June 7, 2022 June 30, 2026
Leticia Lopez Council Member July 20, 2021 June 30, 2025
Sebastian Lozano Legislative Representative March 3, 2025 June 30, 2026
Steve Froberg Vernon Area Representative July 20, 2021 June 30, 2025
Frank Gavina Vernon Area Representative July 20, 2021 June 30, 2025
Clara Gazcon Vernon Area Representative June 7, 2022 June 30, 2026
Michelle Ybarra Vernon Area Representative July 20, 2021 June 30, 2025
1 Appointees are subject to change based on term expirations and unscheduled vacancies that may occur throughout the
year. For a current list of members, please contact the City Clerk’s Department at (323)583-8811, ext. 546 or at
cityclerk@cityofvernon.org.
*Reappointed - second term .
.
Item 9 Page 1 of 2
Local Appointments List
April 14, 2025 Page 2 of 2
GREEN VERNON COMMISSION
The Green Vernon Commission consists of seven members including three representatives from
Vernon’s business community, two labor representatives, and two environmental representatives.
Members serve four-year terms and shall serve no more than two full consecutive terms. The
Commission’s regular meetings are quarterly (March, June, September, and December) on the third
Wednesday at 3:30 p.m. in the Vernon Council Chamber. (Municipal Code Chapter 2.44)
HOUSING COMMISSION
The Vernon Housing Commission consists of seven members including three residents (one of whom
shall be a member of the City Council), three business representatives, and one employee of a
Vernon business. Members serve four-year terms and shall serve no more than two full consecutive
terms. The Commission meets quarterly (March, June, September, and December) on the second
Wednesday at 6:00 p.m. in the Vernon Council Chamber. (Municipal Code Chapter 2.40)
APPEALS BOARD – BUILDING AND SAFETY
In accordance with California Building Code Section 113, California Electrical Code Section 89.108.8,
Electrical Code Administrative Provisions Section 1101, California Mechanical Code Section 110 and
California Plumbing Code Section 1.8.8, an appeals board is to be established by the governing
authority to decide any appeals of orders, decisions or determinations made by the building official
relative to the application and interpretation of the building code. The board is appointed by the City
Council and holds office at its pleasure.
Appointments were last made in 2011 and the Appeals Board has not met in several years. It will be
necessary to make new appointments when necessary.
Appointee Classification Date Appointed Term Expires
Jack Cline Business Representative June 4, 2024 June 30, 2028
Ronit Edry Business Representative June 7, 2022 June 30, 2026
Clara Gazcon Business Representative June 7, 2022 June 30, 2026
Cathy Browne Environmental Representative June 7, 2022 June 30, 2026
Hector Morfin Environmental Representative June 4, 2024 R* June 30, 2028
Martin Perez Labor Representative June 4, 2024 R* June 30, 2028
Stan Stosel Labor Representative June 4, 2024 R* June 30, 2028
Appointee Classification Date Appointed Term Expires
Ronit Edry Business Representative June 6, 2023 R* June 30, 2027
Juliet Goff Business Representative July 20, 2021 June 30, 2025
Jorge Nevarez Jr. Business Representative June 6, 2023 R* June 30, 2027
Bertha Padilla Employee of a Business June 6, 2023 June 30, 2027
Steven Froberg Resident July 20, 2021 R* June 30, 2025
Leticia Lopez Resident (Council Member) July 20, 2021 June 30, 2025
Marlene Ybarra Resident June 6, 2023 R* June 30, 2027
.
.
Item 9 Page 2 of 2
City Council Agenda Report
Meeting Date:July 1, 2025
From:Brian Saeki, City Administrator
Department:City Administration
Submitted by:Diana Figueroa, Senior Management Analyst
Subject
Donation to the Coalition for Human Immigrant Rights (CHIRLA) to Support Immigrant Vernon
Residents and Workers
Recommendation
Approve and authorize a donation in the amount of $25,000 to CHIRLA, a non-profit organization
that will provide Vernon residents and workers access to legal support services and education,
and relief programs that address food insecurity, healthcare, and financial burden (among other
things) to mitigate the impacts of recent federal immigration enforcement action in the City.
Background
In light of recent federal immigration enforcement actions within Vernon and in the broader
region, understandably, there is growing concern among community members. The City is
committed to the safety, dignity, and well-being of all individuals – regardless of immigration
status. As such, City staff proposes contributing funds to support the unique needs of immigrant
families during these challenging times.
The Coalition for Human Immigrant Rights (CHIRLA) is dedicated to supporting the needs of
immigrants and offers a variety of specialized services through its network of partner
organizations. Through CHIRLA, immigrants may find access to much needed essential
resources like food and medication and may leverage legal counsel and representation to
respond to federal immigration enforcement agents’ actions in a strategic, peaceful, and lawful
manner. CHIRLA has been advocating for immigrants’ rights for over 30 years. This trusted
organization is highly engaged in the communities it serves and has the ability to provide
comprehensive assistance to Vernon residents and workers.
City staff recommend that funding be directed to CHIRLA because of the organization’s
experience, expertise, ability to mobilize quickly and efficiently, and their capability to address
multiple, varying community needs. CHIRLA has been vetted by the City’s Vernon CommUNITY
Fund consultant, Jemmott Rollins Group, a firm that is anchored by philanthropic best practices
and understands the requisite for non-profit service organizations to demonstrate accountability,
financial health, and transparency.
With Vernon’s monetary donation, CHIRLA has agreed to:
•Prioritize services for Vernon residents and workers
•Conduct outreach throughout the City of Vernon to ensure that impacted residents and
workers are aware of the services that CHIRLA provides
•Offer educational resources and workshops at various locations in the City
•Consult with individuals and families seeking assistance as needed
•Provide a brief report on the use of funds after the City’s donation has been fully expended
.
.
Item 10 Page 1 of 2
With Council’s approval, City staff will facilitate the donation to CHIRLA and work with the
organization to ensure that immigrant Vernon residents and workers have access to specialized
support services.
Fiscal Impact
The fiscal impact is not-to-exceed $25,000. Sufficient funds are available in the General Fund
City Administration Community Development Account No. 011-010-160-525000 for the current
fiscal year.
Attachments
None.
.
.
Item 10 Page 2 of 2