Loading...
19621107 Regular City Council Meeting - Minutes I I MINUTES OF A REGULAR MEETING OF THE CITY COUNCIL OF THE CITY OF VERNON HELD NOVEMBER 7, 1962 AT TWO O'CLOCK P.M. IN THE COUNCIL CHAMBER OF THE CITY HALL LOCATED AT 4305 SANTA FE AVENUE. VERNON. CALIFORNIA. COUNCIL PRESENT: Anderson, Furlong, Mailliard, Malburg, poxon COUNCIL ABSENT: None The meeting was called to order by Mayor R. J. Furlong. It was moved by poxon, seconded by Anderson, that minutes of the meetings of October 16, 1962 and November 1, 1962 be approved as written and submitted. Motion carried. The Clerk announced that this was the time and place for opening of bids received for furnishing street sweeper, in accordance with Contract No. 286. It was moved by Paxon, seconded by Mailliard, that the Clerk be instructed to open and read the bids submitted. Motion carried. The Clerk opened and read the following bid: The Conveyor Company $ 13,522.00 It was moved by poxon, seconded by Mailliard, that bid received for the furnishing of street sweeper, in accordance with Contract No. 286, be referred to the Traffic Engineer and the City Attorney for checking and report. Motion carried. Communication from D. D. Grayson, Traffic Engineer, dated November 1, 1962, with reference to Mr. J. Levine's letter of October 16, 1962 in which he outlined a proposal for developing 8.28 acres of land located on the southeast corner of Santa Fe Avenue and 37th Street, transmitting a plan showing the exact alignment of the planned road through said property; recommending that the Traffic Engineer be authorized to engage the services of a qualified right of way appraiser in order to determine a fair compensation for the 1.12 acres to be taken from this parcel for the planned road; and recommending that in order to expedite the negotiations with Mobil Oil Company, the same appraiser be retained to evaluate the rest of the required right of way for the Bandini Boulevard Extension between Santa Fe Avenue and Soto Street, was read. (Copy to each member of the City Council) Representatives of J. Levine & Associates appeared before the City Council. Mr. Paul Gordon addressed the City Council with reference to the proposed extension of 38th Street through the property that J. Levine & Associates plan to acquire from Mobil Oil Company and with reference to the proposed development of said property. It was moved by Mailliard, seconded by poxon, that the recommendations of the Traffic Engineer as outlined in communi- cation dated November 1, 1962, be approved. Motion carried. - I I -2- 11/7/62 Communication from D. D. Grayson, Traffic Engineer, dated October 31, 1962, with reference to bids received for the recon- struction of 52nd, 53rd, 54th and 57th Streets, Santa Fe Avenue to the East City Boundary, and Malabar Street, Fruitland Avenue to 52nd Street, in accordance with Contract No. 282, recommending that the contract be awarded to Vernon Paving Company on the basis of their bid of $37,537.05, was read. Resolution No. 2590 - A Resolution of the City Council of the City of Vernon accepting the bid of Vernon Paving Company for the reconstruction of 52nd, 53rd, 54th and 57th Streets, Santa Fe Avenue to the East City Boundary, and Malabar Street, Fruitland Avenue to 52nd Street, in accordance with Contract No. 282 of said City, was read. It was moved by Poxon, seconded by Anderson, that Resolution No. 2590 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, poxon Noes: None Absent: None Communication from D. D. Grayson, Traffic Engineer, dated October 10, 1962, advising that Ed Seymour has completed the instal- lation of traffic signals at the intersection of Fruitland Avenue and Santa Fe Avenue in accordance with Contract No. 280, and recom- mending that the work be accepted and that authority be granted to pay for same in accordance with the terms of the contract, was read. Resolution No. 2594 - A Resolution of the City Council of the City of Vernon accepting the installation of traffic signals at the intersection of Fruitland Avenue and Santa Fe Avenue, in accordance with Contract No. 280 of said City, was read. It was moved by Malburg, seconded by poxon, that Resolution No. 2594 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, poxon Noes: None Absent: None Communication from D. D. Grayson, Traffic Engineer, dated October 26, 1962, advising that Sherwin Electric Service has completed the installation of traffic signals at the intersection of District Boulevard and Atlantic Boulevard in accordance with Contract No. 274, and recommending that the work be accepted and that authority be granted to pay for same in accordance with the terms of the contract, was read. Resolution No. 2592 - A Resolution of the City Council of the City of Vernon accepting the installation of traffic signals at the intersection of District Boulevard and Atlantic Boulevard in accordance with Schedule I of Contract No. 274 heretofore approved by the City of Vernon, was read. It was moved by Malburg, seconded by poxon, that Resolution No. 2592 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, poxon Noes: None Absent: None ......--- I I 11/7/62 -3- Communication from D. D. Grayson, Traffic Engineer, dated October 30, 1962, advising that Ben Barclay Motors has delivered two dump trucks in accordance with Contract No. 278, and recommending that the dump trucks be accepted and that authority be granted to pay for same in accordance with the terms of the contract, was read. Resolution No. 2591 - A Resolution of the City Council of the City of Vernon accepting-the furnishing of two dump trucks in accordance with Contract No. 278, was read. It was moved by Anderson, seconded by poxon, that Resolution No. 2591 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, poxon Noes: None Absent: None Communication from R. H. King, Superintendent, Water & Sewer Systems, dated October 26, 1962, advising that Hydro Construction Company has completed the Elevated Tank Connections in accordance with Contract No. 261, and recommending that the work be accepted and that authority be granted to pay for same in accordance with the terms of the contract, was read. Resolution No. 2593 - A Resolution of the City Council of the City of Vernon accepting the Elevated Tank Connections, in accordance with Contract No. 261 of said City, was read. It was moved by poxon, seconded by ~~lburg, that Resolution No. 2593 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, poxon Noes: None Absent: None Communication from Mason, Muntz & Associates, dated October 30, 1962, advising that Tom E. Norcross, Inc. has completed the construction of Fire Station No. 2 and Communications Building in accordance with Specifications No. 258 with the exception of a few minor items, and recommending that the buildings be accepted by the City of Vernon with the stipulation that these items be corrected prior to 30 days from the filing date of the Notice of Completion, was read. (Copy to each member of the City Council) Resolution No. 2596 - A Resolution of the City Council of the City of Vernon accepting the construction of Fire Station No. 2 and Communications Building, in accordance with Specifications No. 258 of said City, was read. It was moved by Mailliard, seconded by Anderson, that Resolution No. 2596 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mail1iard, Malburg, poxon Noes: None Absent: None Communication from George Halvorsen Company requesting a license to conduct a business of warehousing and distributing doors and hardware at 4185 Charter Street, was read. It was moved by poxon, seconded by Anderson, that the request of George Halvorsen Company be approved and license granted. Motion carried. ...... I I -4- 11/7/62 Communication from Industrial Finance Co. dba S & M Lamp Co. requesting a license to conduct a business of manufacturing a\ltomotive and flood lights at 2369 E. 51st St., was read. It was moved by Anderson, seconded by poxon, that the request of Industrial Finance Co. dba S & M Lamp Co. be approved and license granted. Motion carried. Communication from Royal Power Equipment Co. requesting a license to conduct a business of selling concrete and asphalt saws at 2229 E. 38th St., was read. It was moved by Malburg, seconded by Mailliard, that the request of Royal Power Equipment Co. be approved and license granted. Motion carried. Communication from Service Container Co. requesting a license to conduct a business of manufacturing corrugated shipping containers at 3320 E. 26th St., was read. It was moved by Poxon, seconded by Malburg, that the request of Service Container Co. be approved and license granted. Motion carried. Communication from Muench-Kreuzer Candle Co., Inc. requesting a license to conduct a business of manufacturing and warehousing candles at 2031 E. 51st St., was read. It was moved by Poxon, seconded by Anderson, that the request of Muench-Kreuzer Candle Co., Inc. be approved and license granted. Motion carried. Communication from Gene Allison dba Avalon DeLuxe requesting a license to operate a lunch truck in the City of Vernon, was read. It was moved by Poxon, seconded by Mailliard, that the request of Gene Allison dba Avalon DeLuxe be referred to the Health Department with power to act. Motion carried. Communication from Bernard Freedman dba Scotty's Catering requesting a license to operate a lunch truck in the City of Vernon, was read. It was moved by Poxon, seconded by Mailliard, that the request of Bernard Freedman dba Scotty's Catering be approved and license granted. Motion carried. Communication from D. N. & E. Walter & Co. requesting a license to conduct a business of wholesale distributors and manu- facturers of carpet and wholesale distributors of drapery and upholstery fabrics at 4505 Bandini Blvd., was read. It was moved by poxon, seconded by Malburg, that the request of D. N. & E. Walter & Co. be approved and license granted. Motion carried. I I -5- 11/7/62 Communication from Independent Cities of Los Angeles County, dated October 18, 1962, transmitting a copy of the resolution adopted by the general membership of the Independent Cities of Los Angeles County and submitted to Mr. Debs, Chairman of the Board of Supervisors, commending the County of Los Angeles on its factual stand regarding the costs of contractual police services and urging them to consider an equitable application of tax credits; and urging the City of Vernon to adopt a similar resolution and send a copy to the Board of Supervisors, was read. (Copy to each member of the City Council) It was moved by Anderson, seconded by Poxon, that communi- cation from Independent Cities of Los Angeles County, dated October 18, 1962, together with copy of resolution, be received and filed. Motion carried. Communication from Acme Meat Co., Inc., dated October 22, 1962, requesting permission to construct an enclosed loading dock which will extend 6'10" from existing dock, facing Alcoa Avenue, and leaving a truck space of 32'211 from new dock to curb; and trans- mitting a preliminary drawing of the proposed dock, was read. (Copy to each member of the City Council) It was moved by Poxon, seconded by Mailliard, that the request of Acme Meat Co., Inc., dated October 22,1962, be referred to the Traffic Engineer for study and report. Motion carried. Copy of a letter addressed to ~myor Robert J. Furlong, dated October 29, 1962, from C. A. Yont, with reference to the Vernon Fire Department, was read. (Copy to each member of the City Council) It was moved by Anderson, seconded by Poxon, that copy of a letter addressed to Mayor Robert J. Furlong, dated October 29, 1962, from C. A. Yont, be referred to the Fire Chief. Motion carried. Communication from R. J. Furlong, Director of Civil Defense, dated October 23, 1962, requesting authority for G. G. Skalsky, Assistant Director of Civil Defense, to attend the Southern California and Northern California Civil Defense & Disaster Associ- ation meeting at Bakersfield, California, November 15 & 16, 1962, with an expense allowance of $55.00, was read. It was moved by Poxon, seconded by Mailliard, that the request of the Director of Civil Defense, dated October 23, 1962, be approved and authority granted to issue warrant to G. G. Skalsky in the amount of $55.00. Motion carried. Communication from R. H. Bockhacker, Police Chief, dated October 24, 1962, requesting authority to purchase an additional letter-size filing cabinet with three regular size drawers and two card-size drawers at the top, gray in color, at an approximate cost of $135.00, for use by the Records Division, was read. (Not budgeted) It was moved by Poxon, seconded by Anderson, that the request of the Police Chief, dated October 24, 1962, be approved. Motion carried. I I 11/7/62 -6- Communication from R. H. Bockhacker, police October 17, 1962, recommending that L. S. Rosenkrantz from Sergeant, Grade 4 to Grade 3, effective November read. Chief, dated be advanced 1, 1962, was It was moved by Anderson, seconded by Malburg, that the recommendation of the police Chief, dated October 17, 1962, be approved. Motion carried. Communication from R. H. Bockhacker, police Chief, dated October 30, 1962, requesting authority to purchase an intercommuni- cation system between the Fire Department and the police Department at an approximate cost of $400.00, was read. (Not budgeted) It was moved by Poxon, seconded by Malburg, that the request of the Police Chief, dated October 30, 1962, be approved. Motion carried. Communication from Pittsburgh-Des Moines Steel Company, dated October 26, 1962, transmitting a copy of a written report covering the inspection made of the elevated tank by Mr. H. M. Engle, and offering to correct the four defects mentioned in the fourth paragraph on the second page of Mr. Engle's report, was read. (Copy to each member of the City Council) Draft of a proposed letter to Pittsburgh-Des Moines Steel Company in answer to their communication dated October 26, 1962, was presented by the Superintendent, Water & Sewer Systems. (Copy to each member of the City Council) It was moved by Anderson, seconded by poxon, that a letter be sent to Pittsburgh-Des Moines Steel Company advising them that the City's position remains unchanged, and that the contents of said letter be substantially the same as the draft presented by the Superintendent, Water & Sewer Systems. Motion carried. Activity Log of the police Department for the period October 16 - 31, 1962, inclusive, was presented. It was moved by Anderson, seconded by poxon, that Activity Log of the police Department be received and filed. Motion carried. Communication from D. D. Grayson, Traffic Engineer, dated November 1, 1962, submitting Contract No. 283, Traffic Signal Installation Pacific Boulevard at Fruitland Avenue, and recommending that said contract be approved and that authority be granted to advertise for bids, was read. Resolution No. 2579 - A Resolution of the City Council of the City of Vernon approving Contract No. 283 and Plan No. T 1678 for traffic signal installation at the intersection of Pacific Boulevard and Fruitland Avenue, and determining the general prevailing rate of per diem wages, was read. It was moved by Poxon, seconded by Malburg, that Resolution No. 2579 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, poxon Noes: None Absent: None - I I -7- 11/7/62 Resolution No. 2580 - A Resolution of the City Council of the City ofVernond1rectingthe giving of notice inviting sealed proposals or bids for traffic signal installation at the intersection of Pacific Boulevard and Fruitland Avenue, in accordance with Contract No. 283 of the City of Vernon, was read. It was moved by Poxon, seconded by Anderson, that Resolution No. 2580 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, Poxon Noes: None Absent: None Communication from Robert H. King, Superintendent, Water & Sewer Systems, dated November 1, 1962, advising that Johnson- Peltier Electrical Contractors have completed Equipment and Site Improvement, Well No. 14, Schedule II, Electrical, in accordance with Contract No. 264, and recommending that the work be accepted and that authority be granted to pay for same in accordance with the terms of the contract, was read. Resolution No. 2595 - A Resolution of the City Council of the City of Vernon accepting the electrical work for Well No. 14, in accordance with Schedule II of Contract No. 264 of said City, was read. It was moved by Poxon, seconded by Malburg, that Resolution No. 2595 be approved and adopted. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, Poxon Noes: None Absent: None Communication from East Central Area Planning Committee, dated November 1, 1962, transmitting a copy of a Resolution recently adopted by the East Central Area Planning Committee urging the preliminary design of the Slauson Freeway and the Industrial Freeway to allow orderly progress in the development of the local street systems throughout the East Central Area, and suggesting that each of the participating cities transmit similar Resolutions to the Division of Highways in order that they may be assured that these matters are of significance to the respective communities, was read. (Copy to each member of the City Council) It was moved by Anderson, seconded by Malburg, that the City Attorney be instructed to draft a resolution similar to the one transmitted by the East Central Area Planning Committee with its communication dated November 1, 1962. Motion carried. Communication from the City of Hawthorne, dated October 30, 1962, transmitting a copy of Hawthorne Resolution No. 3467 requesting the support of adoption of State-wide legislation requiring manu- facturing of model glue and related substances to remove from such products those elements harmful to human life, tissue or organs when fumes from such substances are breathed or inhaled, or to require the addition of an odor element to such products designed to give an unpleasant odor thereto thus discouraging the voluntary breathing or inhalation of the fumes from such products, commonly known as IIGlue Sniffing", and requesting that a similar Resolution be adopted by the City of Vernon, was read. -8- 11/7/62 It was moved by Anderson, seconded by Poxon, that communi- cation from the City of Hawthorne, dated October 30, 1962, together with copy of Hawthorne Resolution No. 34,67, be received and filed. Motion carried. I Communication from D. D. Grayson, Traffic Engineer, dated November 1, 1962, requesting authority to purchase one emergency replacement controller, Model ERC-l, with connecting cable wired for a 5l7EG controller cabinet, at an approximate cost of $350.00, was read. (Copy to each member of the City Council) It was moved by Anderson, seconded by l1alburg, that the request of the Traffic Engineer, dated November 1, 1962, be approved. Motion carried. Communication from W. H. Daum & Staff, Industrial Properties, dated November 2, 1962, advising that 4.75 acres of property at 52nd Street and Santa Fe Avenue is available for purchase, and inquiring if the City of Vernon is interested in acquiring this property, was read. It was moved by Malburg, seconded by Mailliard, that communication from W. H. Daum & Staff, Industrial Properties, dated November 2, 1962, be received and filed. Motion carried. Report of Health Department activities for the month of October, 1962, was presented. (Copy to each member of the City Council) It was moved by Poxon, seconded by Anderson, that report of Health Department activities be received and filed. Motion carried. Communication from the Bell Chamber of Commerce, dated October 29, 1962, transmitting a copy of its resolution urging the General Services Administration to sell the Cheli Air Force Base surplus property to private industry, was read. It was moved by Anderson, seconded by Malburg, that communication from the Bell Chamber of Commerce, together with copy of resolution, be received and filed. Motion carried. I Communication from Food Processing Equipment Co. requesting a license to conduct a business of selling and fabricating food machinery at 3840 Fruitland Avenue, was read. It was moved by Poxon, seconded by Anderson, that the request of Food Processing Equipment Co. be approved and license granted. Motion carried. Communication from Aerojet-General Corporation, dated November 1, 1962, thanking and complimenting the City of Vernon on the resuscitation exhibition two weeks ago, was read. (Copy to each member of the City Council) It was moved by Anderson, seconded by Poxon, that communi- cation from Aerojet-General Corporation, dated November 1, 1962, be received and filed. Motion carried. -9- 11/7/62 Communication from Graham Brothers Inc., dated November 5, 1962, requesting permission to park 25 to 40 employees' automobiles on city-owned property directly east and behind Fire Station No. 3 on a temporary basis, was read. It was moved by Anderson, seconded by Mailliard, that the request of Graham Brothers Inc., dated November 5, 1962, be referred to the Engineering Departments for investigation and report. Motion carried. I Communication from the Public Utilities Commission, State of California, dated November 6, 1962, transmitting a certified copy of Resolution No. CP-860 allocating, from the Crossing Protection Fund to the City of Vernon, an amount equal to one-half of the city's share of the cost but not to exceed a maximum amount of $4,265.00 in constructing grade crossing protection at Crossing No. 3A-3.9, the crossing of District Boulevard and the track of Union Pacific Railroad Company, was read. It was moved by Anderson, seconded by Poxon, that communi- cation from the Public Utilities Commission, State of California, dated November 6, 1962, together with certified copy of Resolution No. CP-860, be received and filed. Motion carried. Communication from Royal Catering requesting a license to operate a lunch truck in the City of Vernon, was read. It was moved by Poxon, seconded by Malburg, that the request of Royal Catering be approved and license granted. Motion carried. The following excavation applications, all having approval of the Engineering Departments, were presented: Application 24843 - So. Calif. Gas Co. to test for gas leakage in S/s Fruitland Ave. from Boyle Ave. to Soto St. Application 24844 - Richfield Oil Corp. to repair leak in gasoline pipeline in Boyle Ave. E/o CL, 5/0 CL of Belgrave Ave. I Application 24845 - Vulcan Detinning Division to remove 2 palm trees N/o 50th St. W/o Soto St. Application 24846 - So. Calif. Edison Co. to install 2 poles and remove 3 poles in wls Soto St. N/o Fruitland Ave. Application 24847 - So. Calif. Edison Co. to install one pole in W/s Alcoa Ave. 5/0 Leonis Blvd. Ap-plication 24848 - So. Calif. Edison Co. to install 2 anchors in N & S/s Fruitland Ave. W/o Alcoa Ave. Ap~lication 24849 - Union Pacific Railroad Co. to remove switch track and repave with std. A.C. in E. 37th St. at Jewel Ave. -10- 11/7/62 A:pplication 24850 - Harwin-Stern to construct two driveways, full sidewalk and curb in sls 25th St. ~lication 24851 - So. Calif. Edison Co. to relocate 3 poles and install one anchor at various locations on Santa Fe Ave., 52nd St. & Malabar St. I Application 24852 - So. Calif. Edison Co. to remove and install one pole in N/s 52nd St. E/o Santa Fe Ave. Application 24853 - So. Calif. Edison Co. to install one anchor in N/s 25th St. E/o Alameda St. It was moved by Malburg, seconded by Mailliard, that excavation applications numbered 24.84.3 to 24853 inclusive be filed and permits granted. Motion carried. The following building applications, all having approval of the Building Engineer, were presented: Application 24854 - Socony Mobil Oil Co. to construct slab and footings for future canopy at 2647 E. 37th St. Approximate cost 200.00 Application 24855 - Pan Pacific Mfg. Co. to alter office at 2053 E. 38th St. Approximate cost 6,000.00 Application 24856 - L.A. By Products Co. to construct office at 2920 Ross St. Approximate cost 8,000.00 A~plication 24857 - Stokely-Van Camp Inc. to install fire sprinklers at 2600 S. Bonnie Beach Pl. Approximate cost 3,808.00 Application 24858 - Dunn-Edwards Inc. to install fire sprinklers at 4935 E. 52nd Place. Approximate cost 5,967.00 I Application 24859 - Bethlehem Steel Co. to install sprinkler system at 6000 Alcoa St. Approximate cost 5,400.00 Application 24860 - Bethlehem Steel Co. to partitions and ceiling St. Approximate cost install at 6000 Alcoa 3,000.00 Application 24861 - Chalk Metal Co. to construct warehouse at 2035 E. 46th St. Approximate cost 52,000.00 Application 24862 - Bohemian Distributing addition to spri.nkler E. 49th St. Approximate cost Co. to install system at 2254 875.00 -11- 11/7/62 ~ication 24863 .. Acme Steel Co. to install forced air unit with gas piping at 4.901 Pacific Blvd. Approximate cost 850.00 I Application 24864 .. Snap-Out Binding Co. to install six suspended heaters and gas line at 4445 Santa Fe Ave. Approximate cost 1,300.00 Application 24.865 .. Victorvi1le Barstow Truck Lines to construct dock shed at 2030 E. Ross St. Approximate cost 500.00 Application 24866 .. E. Russell Werdin to construct building at 3650 S. Soto St. Approximate cost 9,500.00 Application 24867 - General Mills to buildings and 15 Fruitland Ave. Approximate cost demolish three silos at 4309 Application 24868 - Service Container line and drinking 26th St. Approximate cost Co. to install water fountain at 3320 E. 125.00 Application 24869 - Central Manufacturing District to install garbage disposal and water heater at 4802 Loma Vista. Approximate cost 325.00 Application 24870 - Aluminum Alloys Heat Treating Inc. to construct addition to building at 3310 Fruitland Ave. Approximate cost 2,991.00 Application 24871 - Standard Auto Body to install plumbing for office addition at 4900 Soto St. Approximate cost 2,500.00 I Application 24872 .. Application 24873 - Consolidated Rock Products to construct three underground rock and sand storage bunkers at 2730 S. Alameda St. Approximate cost 21,000.00 Shu-Mak-Up Inc. to construct dock addition at 3317 E. 50th St. Approximate cost 2,500.00 ~E1ication 24874 - General Electric to remodel building at 2936 E. 46th St. Approximate cost 3,000.00 Application 24875 - Butler Bros. to remodel building at 3030 Atlantic Ave. Approximate cost 1,800.00 -12- 11/1/62 I Application 24876 - Hamm Brewing Co. to reroof building at 4908 S. Alameda Bt. Approximate cost 510.00 Application 24871 - Packers Central Loading to construct smoke house enclosure at 4401 S. Soto St. Approximate cost 4,000.00 A~plication 24878 - Royal Wholesale Cigar Co. to install plumbing at 2910 Alameda St. Approximate cost 2,800.00 Application 24879 - Blatt Distributing Co. to install air conditioning for warehouse addition at 2454 E. 21th St. Approximate cost 4,000.00 APplication 24880 - Ingle Bros. to construct shed roof at 4700 District Blvd. Approximate cost 2,600.00 It was moved by Malburg, seconded by Poxon, that building applications numbered 24854 to 24880 inclusive be filed and permits granted. MOtion carried. "Harrant Register No. 128" covering claims and demands presented during the period October 16 to 31, which includes Demands Nos. 10066 to 10244 (both inclusive), and Nos. LP 1 to LP 8 (both inclusive) drawn on the United California Bank, totaling $1,128,67/+.85 (accounting period November, 1962), was examined and audited. It was moved by Anderson, seconded by Paxon, that "Warrant Register No. 128" be approved and payment authorized for Demands Nos. 10066 to 10244 (both inclusive) and Demands Nos. LP 1 toLP 8 (both inclusive), with no exceptions. Motion carried. Ayes: Anderson, Furlong, Mailliard, Malburg, Poxon Noes: None Absent: None I There being no further business to come before the meeting, it was moved by Anderson, seconded by Poxon, that the meeting adjourn. Motion carried. Attest: ~ F. A. Ziemer, City Clerk 88