Loading...
Resolution No. 4434 1 RESOLUTION NO. 4434 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING SPECIFICATIONS NO. 404 FOR THE REPOWERING OF VERNON FIRE DEPART- :3 MENT ENGINE NO.22 AND AUTHORIZING NOTICE INVITING SEALED PROPOSALS OR BIDS IN ACCORDANCE WITH SPECIFICATIONS NO. 404 OF THE CITY OF 4 VERNON 5 WHEREAS, there has been presented to the City Council of the City 6 of Vernon, Specifications No. 404 for the repowering of Vernon 7 Fire Department Engine No. 22, and 8 WHEREAS, the City Council of the City of Vernon has determined 9 that it is in the best interesmof the City of Vernon that pro- 10 posals be made for the repowering of Vernon Fire Department Engine 11 No. 22 and that a Contract or Purchase Order be awarded in accor- 12 dance with applicable laws, 13 NOW, THEREFORE, BE IT RESOLVED: 14 SECTION 1: That Specifications No. 404 is hereby approved by 15 the City Council of the City of Vernon. 16 SECTION 2: That the City Clerk of the City of Vernon is 17 hereby directed to file in his office at the City Hall of the City 18 of Vernon a copy of Specifications No. 404. 19 SECTION 3: That the City Clerk of the City of Vernon is 20 hereby directed to give Notice, in writing, inviting sealed pro- 21 posals or bids for the repowering of Vernon Fire Department Engine 22 No. 22, in accordance with Specifications No. 404, and in accor- 23 dance with this Resolution. 24 SECTION 4: There being no newspaper of general circulation 25 printed, published or circulated in the City of Vernon, the City 26 Clerk is hereby directed to post said Notice, or cause the same 27 to be posted, in three (3) of the most public places in the City 28 of Vernon, to wit: the northwest corner of 38th Street and Santa 29 Fe Avenue, the northeast corner of Leonis Boulevard and Pacific 30 Boulevard, and on the bulletin board in the lobby of the City 31 Hall of the City of Vernon, located at 4305 Santa Fe Avenue in 32 said City. -1- 1 SECTION 5: That the City Clerk of the City of Vernon is 2 hereby directed to post said Notice forthwith and the first 3 posting of said Notice shall be not less than ten (10) days before -, 4 the opening of bids for the proposed work. That said Notice shall 5 provide that sealed proposals or bids will be received by the 6 City of Vernon, California, at the Office of the City Clerk of 7 said City at the City Hall, 4305 Santa Fe Avenue, Vernon CA 90058, 8 until the hour of two (2) o'clock P.M., on-the 7thday of Septem- 9 ber, 1976, and in accordance with Specificatiom No. 404 approved 10 by said City. 11 SEctION 6: . That the City Clerk of the City of Vernon shall 12 certify to the passage of this Resolution and thereupon and there- 13 after the same shall be in full force and effect. 14 ADOPTED AND APPROVED this 17th day of August, 1976. 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 :30 31 32 ~~~~ ~?-6k~" THOMAS A. Y , Mayor Pro Tempore L'.City Clerk -2- - '...." .. 91 10 : 11 12 1:3 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 . ..... . 1 STATE OF CALIFORNIA ) ) SSe 2 COUNTY OF LOS ANGELES ) 3 4 I, F. A. ZIEMER, City Clerk of the City of Vernon, do 5 hereby certify that the foregoing resolution, being Resolution 6 No. 4434 , was duly adopted by the City Council of the C ty of 71 8 Vernon, and approved by the Mayor of said City, at a regular August 17, 1976 meeting of the City Council held on ~ F. . Z1~. c~ty Clerk , 1 2 AFFIDAVIT OF POSTING 3 STATE OF CALIFORNIA ) ) ~ COUNTY OF LOS ANGELES ) ss. ) 5 CITY OF VERNON ) 6 7 I, F. A. ZIEMER, City Clerk of the City of Vernon, do 8 hereby certify that I did, on the 18th day of August 9 19~, post three (3) cop~es of NOTICE INVITING BIDS I ~ I 10 I 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 :31 32 (SPECIFICATIONS NO. 404) , one in each of ~he following places, to wit: At the northwest corner of 38th Street and Santa Fe Avenue, at the northeast corner of Leonis Boulevar~and Pacific Boulevard, and on the bulletin board in the lobby of the City Hall of the City of Vernon, located at 4305 Santa Fe Avenue, all in sa id City, there being no newspaper of genera.l circula tion printed and published in the City of Vernon. Signed this Au~ust , 19-IL. 18th day of ~. cityC}erk Subscribed and sworn to before me this 18th da y of d~-ilh.-..l Notary Public in and for the County of Los Angeles, State of California. AUGUST , 19~ ~ Sfl:AL \ H. MC~\ENNA Cf\L_l-FO~~NIA , :~ ( i ,~TY ,lJ78 ~3Q5 Santa Fe Ave., Vcrnvii, ".. """"" r CITY OF VERNON~ CALIFO~~IA NOTICE INVITING BIDS FOR THE REPOWERING OF VERNON FIRE DEPARTMENT ENGINE NO. 22 IN ACCORDANCE WITH SPECIFICATIONS NO. 404 Sealed proposals will be received by the CITY OF VERNON, CALIFORNIA at the CITY CLERK'S OFFICE of said City at 4305 Santa FE;..Avenue, Vernon, CaUforni a 90058, until 2 :00 p.m. on SEP f - 1::176 for repowering of the City of Vernon Fire Department Engine No. 22 in accordance with Specification No. 404 approved by said City. The proposal will be publicly opened and read in the lunch room of the Public Works facility located in the Northwest corner of the City Hall property located at 4305 Santa Fe Avenue in the City of Vernon, California, on the date and at the above mentioned time. Specifica- tions may be obtained at the City Clerk's Office. The equipment to be furnished under said specifications is as follows: Fire Department Specifications for Repowering Engine No. 22 (See attached for equipment list and specifications) ~ F. A. Zi emer, . City Clerk - Director of Finance City of Vernon, California -AUG 17 1976 Dated: II -'" SPECIFICATIONS #404 FOR REPOWERING FIRE ENGINE #22 Specifications prOVide for the repowering of City Fire Engine #22~ with a diesel automotive engine~ Cummins Custom Built ~10del #NTC-350~ 350 H.P.~ 855 cubic inch~ 6 cylinder or equivalent, subject to City approval~ complete with the following: 130 amp alternator, bracket and regulator. 12 volt starting motor. air compressor. Farr air cleaner. Full flow oi 1 fil ter. Single Stage fuel filter. Water filter. Fly wheel, with housing and fan. The engin~ is presently powered by a 1091 Hall Scott gasoline engine rated 324 horsepower at 2300 RPM and drives a triple combination 2000 GPM waterous pump. The present electrical system is 12 volt and shall remain negative ground system. City will furnish necessary batteries. Electrical knife switch is to be replaced with a marine electrical perca1 switch to be located on left hand side of Captain1s seat, accessible to the driver. The present radiator refill and auxiliary system shall remain. It may be modified as necessary and approved by the City. Cooling shall comply with engine manufacturers specifications and include deaireation system. Work to be done as follows: SECTION A - ENGINE 1. Remove eXisting engine, all engine compartment wiring, stearn clean and refinish engine compartment. Deliver old 1091 Hall Scott ... ... engine to Vernon Fire Department garage. 2. Air filter shall be dry type, Farr, or City approved and shall be installed in an area that will supply sufficient atmospheric air to meet manufacturing engine specifications and to maintain adequate cooling of engine. 3. Furnish and install Perry model water filter, disposable cartridge type, acces'sible through compartment. 4. Modify or reconstruct the complete exhaust system including headers, mufflers and tailpipes as necessary. 5. Purge and clean present fuel tank ready to accept diesel fuel. 6. Total diesel installation shall be made in a factory-like manner to fully meet the required standards for fire apparatus, in qual ity, performance, reliability and appearance. SECTION B - CLUTCH 1. Remoye existing clutch. 2. Install new clutch, spicer, angle spring, 2 plate type twin disc with brake clutch, or City approved equal. Clutch foot pressure shall not exceed 40. pounds foot pressure. SECTION C - PRE-HEATER UNIT 1. Kim, Jet or City appr~ved equal shall maintain approximately 100-140 degrees temperature. The pl ug-i n receptacl e shall be on the driver's side of the vehicle with the receptacle matching the standardized units of the Vernon Fire Department. SECTION 0.- MISCELLANEOUS 1. Completed unit shall be road tested and the pump tested to quality NFPA standards. Should pump require repair, contractor shall submit a report on the cost and type of reapirs required for City approval. Cost to make necessary repairs will not be a part of this bid. -2- \ ...,. ...~ .11'_ .,. ,'),.~ 3. Pump acceptance test to be conducted at Vernon Fire Department Station #1,3375 Fruitland Avenue, Vernon, California, by success- ful bidder. 4. Noise level of engine shall be reduced to meet current California State Industrial Safety orders, Standards of Occupational Noise Exposure. 5. All applicable Federal and California State standards for exhaust omission shall be in conformity with standards required. SECTION E - TRANSMISSION 1. Inspect and replace all worn parts of pump and road transmission using parts supplied by original equipment manufacturer. SECTION F - WATER TANK & TANK GAUGE 1. Replace present gauge.with MC tank level unit (lite unit). Inspect, repair as necessary and coat water tank. Installa~ion shall include all labor, materials and components required to bring the pumper to National Fire Protection Association standards. Installation and components shall be unconditionally guaranteed for a period of one year. Price to include all applicable taxes, surcharges, etc. SECTION G - COMPRESSION RELEASE Engine shall be equipped with a compression release. SECTION H - HAND BRAKE SYSTEM Remove old hand brake system and replace with a new maxi-spring brake and valves. Check and replace. gear shift linkage if necessary. Bidder shall furnish shop manual for engine and parts manual for compon- ents and parts numbers. -3- ,