Loading...
Resolution No. 5124 , , 'lit 1 , ') ~ .i ...;.." ~ ,'" 1 2 RESOLUTION NO. 5124 A RESOLUTION OF THE CITY COUNCIL OF THE CITY 3 OF VERNON AEPROVING AND AUTHORIZING THE EXECUTION OF A TRANSMISSION SERVICE AGREEMENT 4 BY AND BETWEEN SUNLAW COGENERATION PARTNERS I AND THE CITY OF VERNON FOR COGENERATION FACILITY 5 LOCATED AT-DOWNEY ROAD AT 50TH STREET 6 WHEREAS, Sunlaw Cogeneration Partners I (hereinafter 7 referred to as ItSunlawlt) proposes to own, operate and maintain 8 a 29MW electric Generating Facility fueled by natural gas, with 9 No. 2 distillate as backup fuel; and 10 WHEREAS, Sunlaw has filed for and received the II necessary approval from the Federal Energy Regulatory Commission 12 to qualify as a ItQualifying Cogeneration Facility" pursuant to 13 the Public Utility Regulatory policies Act; and 14 WHEREAS, Sunlaw has filed an Environmental Impact 15 Analysis with the U.S. Department of Energy, Economic 16 Regulatory Administration and has received an Authority to 17 Construct permit from the South Coast Air Quality Management 18 District for said Cogeneration Facility; and 19 WHEREAS, the City of Vernon ha.s performed an analysis 20 of the environmental impacts associated with the Cogeneration 21 Facility; and 22 WHEREAS, Sunlaw has filed with the City of Vernon an 23 application for a conditional use permit which would allow the 24 operation of said Cogeneration Facility at Downey Road at 50th 25 Street in the City of Vernon; and 26 WHEREAS, the City Counci16f the City of Vernon 27 on June 19, 1984, adopted and approved a Negative Declaration, 28 in accordance with the California Environmental Quality Act .. .. ,: 11 " 1 .. I that the issuance of a conditional use permit for the Co- 2 generation Facility will not have a significant effect on the 3 environment and approved a conditional use permit authorizing 4 cogeneration use at the Cogeneration Facility; and 5 WHEREAS, Sunlaw desires to operate said Cogeneration 6 Facility in electrical parallel with Vernon's electrical system 7 and to sell to Edison a maximum of 29,000 kilowatts of Capacity 8 and the Energy associated with said Capacity from said Co- 9 generation Facility in accordance with an agreement with Edison; 10 and 11 WHEREAS, Sunlaw has requested Firm Transmission Service 12 at 66 kv from Vernon to transmit said Capacity and Energy from 13 said Cogeneration Facility to the Point of Interconnection with 14 Edison; and 15 WHEREAS, Sunlaw and the City of Vernon desire to enter 16 into an agreement to establish the terms, conditions and 17 obligations necessary to accomplish the Firm Transmission 18 Service. 19 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF 20 THE CITY OF VERNON AS FOLLOWS: 21 SECTION 1: That the City Council of the City of Vernon 22 hereby determines that the recitals contained hereinabove are 23 true and correct. 24 SECTION 2: That the City Council of the City of Vernon 25 hereby approves the Transmission Service Agreement by and between 26 Sunlaw Cogeneration Partners I and the City of Vernon for 27 Cogeneration Facility located at Downey Road at 50th Street, a 28 copy of which has been presented to the City Council concurrently -2- 'I .....' ,~ It .( , 1 with this Resolution, and the City Council hereby orders said 2 Transmission Service Agreement to be received and filed by the 3 City Clerk. SECTION 3: That the City Council of the City of Vernon -I 5 hereby authorizes the Mayor and the City Clerk to execute said 6 Agreement for, and on behalf of, the City of Vernon. 7 SECTION 4: That the City Clerk of the City of Vernon 8 shall certify to the passage of this Resolution and thereupon 9 and thereafter the same shall be in full force and effect. 10 APPROVED AND ADOPTED this 3rd day of July, 1984. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ATT~.?? : .:;;';'-?/. ~.. ~/ /-:, ,"",,7 ~ . ~///i;~Z'>e,~-;I/5- BRUCE V. MALKENHORST, City Clerk -3- . 1 " . ~ '" Resolution No. 5124 , was duly adopted by the City Council of ) ) ss. COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of certify that the foregoing Resolution, being the City of Vernon, and was approved by the Mayor of said City an adjourned \ at ~ regular meeting of the City Council held on Tuesday, ., 19 84 .t ' , '- \ " '" t "" . TRANSMISSION SERVICE AGREEMENT BETWEEN SUNLAW COGENERATION PARTNERS lAND CITY OF VERNON FOR A COGENERATION FACILITY TO BE LOCATED AT \. DOWNEY ROAD AT 50TH STREET k ~;, .. .. 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0 13.0 14.0 15.0 16.0 17.0 18.0 19.0 20.0 21.0 22.0 " TART.F. OF CDNI'ENTS RECITALS . . Definitions . . . . . . . . . . . . . . . . . . . . . .. . . . .. . . . . . . . . . . . . . . . . . . . . Firm Transmission Service . . . . . . . . . . . . . . . . . Interruptible Transmission Service . . . . . . . . . . · . · CUrtailment of Service .................. Charges for Transmission Service Rate Adjustments Payxnent . . . . . . . . . . No Dedication of Facilities . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . Indemnification ...................... Liability . . . . . . Uncontrollable Forces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . Control and Maintenance of Facilities . . . . . . . . . . . Effective Date and Term . . . . . . . . . . . . . . . . . . Assigmnent or Transfer of Interest . . . . . . . . . · · · . Waiver . . . . . . . . . . . . . . . . . . . . · · · · · · · Captions Choice of Laws . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . Governmental Jurisdiction and Canpliance with Law Land Rights Metering General Technical Requirements Notices ..... . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RAge 1 4 7 8 8 10 15 15 18 18 19 20 21 21 21 22 23 23 23 24 24 25 30 ... \ ~ , f 23.0 24.0 25.0 26.0 27.0 28.0 29.0 30.0 31.0 32.0 33.0 34.0 35.0 36.0 37.0 \ TA'Rp~ OF <nnENTS. con It. Operation of the Cogeneration Facility .......... Displtes .......................... Disclaimer ........................ Interconnection Facilities Design . . . . . . . . . . . . . CMnership and Operation of Interconnection Facilities . . . Taxes . . . . . . . . . . . . . . . . . . . . . . . . . . . ~mm~io~~~t .................. Sale of Cogeneration Facility . . . . . . . . . . . . . . . Priority of Agreanent . . . . . . . . . . . . . . . . . . . Previous Catlnlmications . . . . . . . . . . . . . . . . . . Third Party Beneficiaries . . . . . . . . . . . . . . . . . Successors and Assigns .................. Fuel Use Franchise Fee .................. Insurance . . . . . . . . . . . . .. . . . . . . . . . . . Further Assurances .................... .Page 31 33 34 35 35 35 36 37 37 37 38 38 38 39 41 , . \, { r 4, , .. , TRANSMISSlOO SERVICE K;REEMENT This Agreement is made and entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all plrposes, and to be performed in Vernon, California as of the_ day of July, 1984. BY AND BEmiEEN City of Vernon, a Municip:il Corporation (hereinafter referred to as ~ernonn) 4305 Santa Fe Avenue Vernon, CA 90058 AND Sunlaw Cogeneration Partners I, a California Limited Partnership (hereinafter referred to as nCogeneratorn) 8530 Wilshire Boulevard, Suite 401 Beverly Hills, CA 90211 1. RECITALS Whereas, Cogenerator proposes to own, operate and maintain a 29MW electric Generating Facility fueled by natural gas, with No. 2 distillate as backup fuel; and Whereas, Cogenerator has agreed to sell to Edison all of the electrical Energy and Capacity produced by the Cogeneration Facility at 66 kv; and Whereas, Cogenerator has filed an application with the Federal Energy Regulatory Commission (nFERCn) requesting ce.rtification of nQualifying Cogeneration Facilityn status of a proposed Cogeneration Facility at Downey Road at 50th Street, Vernon, California; and -1- t 1 ~ I .. Co. . .. Whereas, the FERC has approved said Cogeneration Facility as a nQualifying Cogeneration Facilityn pursuant to the Public Utility Regulatory Policies Act1 and Whereas, Cogenerator has filed an Enviromnental Impact Analysis with the U.s. Department of Energy, Economic Regulatory Mministration1 and Whereas, Cogenerator has received an Authority to Construct permit from the South Coast Air Quality Management Distr ict for said Cogeneration FacilitY1 and Whereas, Vernon has performed an analysis of the environmental impacts associated with the Cogeneration FacilitY1 and Whereas, Cogenerator has filed with Vernon an application for a conditional use permit which would allow the operation of said Cogeneration Facility at Downey Road at 50th Street, Vernon, California 90058; and Whereas, Vernon has adopted and approved a Negative Declaration, in accordance with the California Environmental Quality Act, that the issuance of a conditional use permit for the Cogeneration Facility will not have a significant effect on the environment; and Whereas, Vernon has approved a conditional use permit authorizing cogeneration use at Downey Road at 50th Street, Vernon, California 900581 and Whereas, Cogenerator has entered into an agreement with Edison wherein Cogenerator will construct, own, operate and control a Cogeneration Facility at Downey Road at 50th Street, Vernon, California 900581 and Whereas, Cogenerator desires to operate said Cogeneration Facility in electrical parallel with Vernon's electrical system and to sell to Edison a maximum of 29,000 kilowatts of Capacity and the Energy associated with said -2- ,j;..':"'" ._~"~"'.'- < ......:... .-.oF.... .. '__." .-.,..;... t, 1 1 J, I .. " Capacity fran said Cogeneration Facility in accordance with said agreement: and Whereas, Edison is obligated to purchase at 66kv Capacity and Energy associated with Cogeneration Facility plrsuant to said agreement: and Whereas, Cogenerator has requested Firm Transmissial Service at 66kv from Vernal to transmit said Capacity and Energy from said Cogeneration Facility to the Point of Interconnection with Edison: and Whereas, Vernal has agreed to provide Firm Transmission Service at 66kv in accordance with the terms and conditials provided for herein: and Whereas, Cogenerator desires to purchase from Vernon plrsuant to filed rates all of the electrical requirements of the Cogeneration Facility: and Whereas, Vernon acknowledges that Cogenerator receives payment from Edison plrsuant to the Edison Agreement, which depends upon the reliability of the Capacity and Energy supplied by Cogenerator and that the Firm Transmission Service provided by Vernon may affect the reliability of said Capacity and Energy: and Whereas, Cogenerator will limit the productial of electrical production from said Cogeneration Facility, if necessary to maintain the Vernon Electric System Integrity: and Whereas, the Parties desire, by this Agreement, to establish the terms, conditions, and obligations pursuant to which they can accomplish the above desires and needs. Now, therefore, in consideration of the nutual covenants, pranises, and conditions Caltained herein, the Parties hereto agree as follows: -3- 1 I " I. I.. . .. 1.0 J)efinitions - Whenever used in this Agreement, appendices or attachments hereto, the f9110wing terms when initially capitalized shall have the following meanings: 1.1 Agreement - This document, inCluding its awendices, as amended from time to time. 1.2 Both Cogeneration Facilities - The Cogeneration Facilities located in Vernon, Califomia at Downey Road at 50th Street and the southwest corner of Vemon and Alcoa Avenues. 1.3 Capacity - The maximum output capability of the Cogeneration Facility, expressed in kilowatts. 1.4 Cogeneration Facility - The Generator, together with all associated equipnent and improvements, necessary to produce electrical energy and the Interconnection Facilities installed by Cogenerator at Downey Road at 50th Street, Vernon, Califomia 90058. 1.5 Control - Tb establish and maintain the electrical energy output of the Cogeneration Facility through dispatching procedures, including shutdown and startup. 1.6 Edison - The Southem California Edison Canpany. 1.7 EdisQn l\greement - The Parallel Generation Agreement between Sunlaw Energy Corporatioo. and Southern California Edison Company, dated July 12, 1982, and its amendments, which will be fully assigned by Sunlaw Energy Corporation to Cogenerator. 1.8 Emergency - Any condition or situatioo. which would occur during any period which in Vemon's sole judgement affects Vemon's ability to maintain continuous electrical service. 1.9 Energy - Kilowatt-hours generated by the Cogeneration Facility. -4- 1 t ~ I .. '- , 1.10 Firm Qperation Date - The day ccmnencing at 0001 hours fOllowing the day on which Cogenerator notifies Vernon in writing that all features and equipment of the Cogeneration Facility are capable of operating to deliver a reliable source of Capacity and Energy through Vernon's system to Edison. 1.11 Firm Transmission Capacity - The fixed electric capacity made available on Vernon's 66kv electrical system for the plrpose of providing Firm Transmission Service to Cogenerator, and further specified as 29,000 kilowatts for the Cogeneration Facility and/or 58,000 kilowatts for Both Cogeneration Facilities. 1.12 Firm Transmission Service - Vernon's acceptance of Capacity and Energy from the Cogeneration Facility at 66kv into Vernon's Transmission Facilities, and delivery of said Capacity and Energy at 66kv less any transmission losses to Edison. 1.13 Generator - The generator and/or its associated prime rover which is a part of the Cogeneration Facility. 1.14 Harmonics - Waveforms whose frequencies are multiples of the fundamental sixty (60) Hertz waveform. 1.15 Interconnection Facilities - The protection and metering equipment and other related facilities which are required in order to permit an interface or interconnection between Vernon's electrical system and the Cogeneration Facility, all in accordance with gocx1 utility standards. 1.16 Qperate - To provide the engineering, purchasing, repairt supervision, training, inspection, testing, protection, operation, use, management, replacement, retirement, reconstruction, and maintenance of and for the Cogeneratioo Facility. -5- 1 ' " ... ( 1.17 O~ration Testing Date- The date on which the Cogeneration Facility is ready for testing purposes requiring delivery of electricity into the Vernon electric system. 1.18 Parties - Vernon and Cogenerator. 1.19 Point of Interconnection with Vernon - '!he Iilysical and electrical interconnection of the Cogeneration Facility with the 66kv electric facilities of Vernon. 1.20 Protectiv~ Devices - The equipment and apparatus installed by Cogenerator and/or Vernon to facilitate the separation of the Cogeneration Facility from Vernon's electrical system in the event of a fault. 1.21 Prudent Electrical Practices - Those practices, methods, and equipment, as changed from time to time, that are commonly used in prudent electrical engineering and operations to operate equipment lawfully and with safety, dependability, efficiency, and economy. 1.22 Special facilities - Mditions, betterments, modifications and/or reinforcements to the Vernon system which are reasonably and necessarily required to accarmodate the receipt of Capacity and Energy into the Vernon System from the Cogeneration Facility or to acconmodate the delivery of Capacity and Energy to Edison. 1.23 Transmission Facilities - The 66kv transmission lines and all associated equipment and facilities extending from the Point of Interconnection with Vernon to Vernon's Point of Interconnection with Edison. 1.24 Transmission Service Rate - Vernon's rate in dollars per kilowatt-month charged to Cogenerator for Firm Transmission Service. -6- 'I , " , ~ 1.25 Vernon EleGtric System Integri~ - Operatioo of Vemon's electric system in a manner that minimizes risk of injury to persons and/or property and enables Vemon to provide reliable electric service to its customers. 1.26 Vernon's Point of Interconnection with Edison - The point where Vernon's electrical conductors connect to Edison's electrical conductors and where transfer of electrical energy between Vernon and Edison takes o1ace. 1.27 Vernon System - Vernon's electrical system including but not limited to distribution facilities, transmission facilities, substations, metering facilities, protective devices, generating plant and other related facilities. 2.0 Firm Transmission Service 2.1 Vernon shall receive at 66kv Capacity and Energy generated py Cogenerator and transmit and deliver at 66kv said Capacity and Energy reduced by transmission losses to Edison subject to the terms and conditions provided for herein. For purposes of this Agreement, transmission losses shall be designated as 0.6 percent of the Capacity and Energy generated and delivered by Cogenerator and received by Vernon at the Point of Interconnection with Vemon. Vemon's Capacity obligation to provide Firm Transmission Service herein shall be limited to a maximum of 29,000 kilowatts. 2.2 Firm Transmission Service under this Agreement shall commence on the Firm Operation Date of the Cogeneration Facility. -7- t , t ' ~ I\. ... . 2.3 Vernon shall construct and place into operation the Special Facilities which will be used to transmit the Capacity and Energy generated by the Cogeneration Facility to Edison. Vernon shall canplete construction of such facilities prior to the Operation Testing Date of the Cogeneration Facility. 3.0 Interrqptiple Trqpsmissian Service 3.1 Vernon shall provide interruptible transmission service at 66kv commencing on the Operation Testing Date and prior to the Fir.m Operation Date, and at times when Cogenerator delivers to Vernon Energy in excess of 29,000 kilowatts when transmission capacity is available. 3.2 Interruptible transmission service will be subject to interruption at Vernon's sole discretion. 4.0 Curtailment of Service 4.1 Vernon reserves the right to interrupt, suspend or curtail Fir.m Transmission Service in order to maintain, repair or replace its Transmission Facilities or preserve Vernon's Electric System Integrity and will provide reasonable notice to Cogenerator as circumstances permit. Vernon agrees to use reasonable efforts to coordinate planned outages with Cogenerator . 4.2 Vernon reserves the right to interrupt, suspend or curtail Firm Transmission Service in order to improve its Transmission Facilities in accordance with Prudent Electric Practice upon giving reasonable advance notice, pursuant to the provisions of Section 23.3. Vernon agrees to use reasonable efforts to coordinate planned outages with Cogenerator. -8- I , , "- , ~ 4.3 Vernon shall retain priority of use over its Transmission Facilities, and reserves the right to interrupt, suspend or curtail Firm Transmission Service and will provide reasonable notice to Cogenerator as circumstances permit in the event that said facilities are required by Vernon for transmission of Capacity and Energy throughout its system. 4.4 In the event that Firm Transmission Service or any portion thereof is interrupted, suspended or curtailed, Vernon shall not be obligated to deliver to Edison for Cogenerator from Vernon resources or the resources of another, that amount of Energy or Capacity that Cogenerator would have transmitted to Edison had Firm Transmission Service not been interrupted, suspended or curtailed. 4.5 Vernon acknowledges that the Firm Transmission Service provided for herein may impact Cogenerator's revenue from Edison under the Edison Agreement and therefore Vernon shall use its best efforts to minimize the frequency and duration of curtailments. 4.6 Vernon's inability to provide Firm Transmission Service during a per iod of emergency on the Edison system in accordance with the Edison Agreement may subject Cogenerator to a penalty in the level of payments which Cogenerator receives from Edison for its Capacity. Accordingly, at Cogenerator' s request, Vernon shall use its best efforts during such periods to deliver Cogenerator's Capacity to Edison. In the event that said emergency occurs during a time period that Vernon has previously scheduled an outage, Vernon shall make reasonable efforts to reschedule the outage. 4.7 The provisions of this Agreement have been designed under the assumption that Edison will not improperly deny Vernon the right or ability to receive econany energy and/or to obtain energy credits for said ecooany energy as -9- , , -\.. .. . a result of the deliver of Capacity and Energy by Cogenerator into the Vernon System. In the event that Edison improperly denies Vernon the right to receive said econany energy and/or credits as a result of the delivery of Capacity and - Ene rgy by Cogene rator into the Vernon System, Vernon filiall notify Cogenerator of such event. Said notification shall include the capacity, cost of energy, duration of availability and any other relevant details pertaining to the economy energy purchase available to Vernon to the extent that such information is available. Following such notification, Cogenerator shall at its option: (i) curtail the delivery of Capacity and Energy to the Vernon System during such time that said ecmany energy is available for plrchase by Vernon, provided that, such curtailment by Cogenerator will enable Vernon to receive said econany energy and/or credits fran Edison; or (ii) indemnify Vernon for financial losses incurred as a result of Edison' s improper denial of Vernon's ability to receive said econany energy. 5.0 Charqes for Transmission Service 5.1 The obligation to pay charges for Firm Transmission Service under this Agreement shall conmence as of the Firm Operation Date, but in no event shall payment for Firm Transmission Service be deferred beyond Decent>er 31, 1987. 5.2 Cogenerator and Vernon intend to execute a similar transmissioo. agreement to transmit Capacity and Energy fran a cogeneration facility located at Downey Road at 50th Street, Vernon, California 90058. Therefore, a total of 58,000 kilowatts of Firm Transmission Capacity will be required in order to provide service for Both Cogeneration Facilities. -10- ~-<-,. '-, '!' , I " . '-- . ~ J 5.2.l Cogenerator shall pay Vernon a monthly fee for Firm Transmission Service mder this Agreement. Subject to Sectial 5.2.2 and Article 6, the Transmission Service Rate shall be $1.006 per kilowatt-month for the first ten (10) years (120 months) after the Firm Operation Dates of Both Cogeneration Facilities. Themonthly fee charged to Cogenerator shall be canputed by multiplying the Transmission Service Rate times the canbined 58,000 kilowatt Firm Transmission Capacity reserved and required for Both Cogeneration Facilities. 5.2.2 In the event that ally one Cogeneration Facility is finally canpleted or that the Firm Operation Dates of Both Cogenera- tion Facilities are not the same, then subject to Article 6, the Transmission Service Rate shall be increased to 1.115 dollars per kilowatt-month and the IOOnthly fee for Firm Transmission Service for the first-canpleted Facility shall be canputed by multiplying the Transmission Service Rate, as provided for in this Section 5.2.2, times the 29,000 kilowatt Firm Transmission Capacity reserved and required for the completed facility, until the secald facility is also canpleted. 5.3 Additionally, Cogenerator shall pay to Vernon a fee of 2 ttdlls ($0.002) per kilowatt-hour for interruptible transmission service, applied to the Energy actually received at the Point of Interconnection with Vernon, for (a) the transmission of Energy delivered to Edison from the Operation Testing Date and continuing until the Firm Operation Date for the Cogeneration Facility is established, and (b) the transmission of Energy delivered to Edison which is -11- 1 . . l , . I $ greater than 29,000 kilowatts or a combined 58,000 kilowatts for Both Cogeneration, Facilities when measured at the Point of Interconnection with Vernon. 5.4 Cogenerator shall coordinate with Vernon concerning the initiation of operation testing, and shall provide thirty (30) days advance written notification of establishment of the Firm Operation Date for the Cogeneration Facility. 5.5 Cogenerator shall pay the costs of all Special Facilities required to provide or continue to provide Firm Transmission Service wherever located except Vernon shall pay the first TWo Hundred Fifty Thousand Dollars ($250,000) of the Cogeneration Facility, or the first Five Hundred Thousand Dollars ($500,000) of Both Cogeneration Facilities installed on Vernon's side of the Point of Interconnection with Vernon. 5.6 Cogenerator shall pay costs reasonably and necessarily incurred by Vernon in the event Vernon must redesign its system or modify the Vernon/Edison intertie in the future to continue to provide Firm Transmission Service to Cogenerator herein. In the event that there are other cogenerators on the Vernon System contributing to the need for such redesign or IOOdification of the Vernon System, Cogenerator shall be required to pay only its proportionate share of said cost, based on the total capacity of transmission service provided by Vernon to all cogenerators contributing to the need for said redesign or modification. 5.7 In the event that Cogenerator abandons its plans for installation of the Cogeneration Facility at any time and for any reason whatsoever, including the failure to obtain any required ~rmits, Cogenerator shall provide thirty (30) days advance notice to Vernon to stop construction and cancel .equipment -12- j . '" , .... }. I " " purchases. Cogenerator agrees to reimburse Vernon for any and all non-recoverable costs incurred by Vernon for the Special Facilities prior to the date of such notification. Cogenerator shall reimburse Vernon for all such costs within thirty (30) days after presentation of an invoice. Vernon shall supply doctnnentation of said costs incurred at Cogenerator' s request. 5.8 Cogenerator acknowledges that (a) electrical line losses will occur as a result of Vernon's transmission of Energy generated by the Cogeneration Facility from the Point of Interconnection with Vernon to the Point of Interconnection with Edison, (b) Vernon estimates that such losses will amount to 0.6 percent of the Energy received by Vernon at the Point of Interconnection with Vernon, (c) Vernon and Cogenerator agree that Vernon should be canpensated by or receive appropriate credits from Edison for actual line losses, (d) as of the date of this Agreement, Vernon and Edison have not reached a satisfactory agreement as to a method for providing such compensation or credit, and (e) Vernon desires to encourage the developnent of cogeneration resources within the City, and is therefore willing to execute this Agreement prior to reaching a satisfactory understanding with Edison concerning compensation ,or credit to Vernon for said line losses, provided that. Cogenerator shall agree, to reimburse Vernon for up to one-third of such expected line losses. 5.9 Cogenerator agrees to pay to Vernon line loss reimbursement as follows: 5.9.1 Payments for reimbursement by Cogenerator to Vernon for line losses shall only be due in the event that (a) the Cogeneration Facility shall have produced more than 235 million kilowatt-hours of e~ectrical energy in a calendar year for which the -13- , ., ~ .. determination of payment is to be made, and (b) Vernon has remained unsuccessful in negotiating an arrangement with Edison to receive for actual line loss full canpensation or full credit. 5.9.2 In the event that such conditions have occurred, Vernon shall, within thirty (30) days fOllowing the end of each calendar year for which any payment under this Section is due, sul::Jnit an invoice to Cogenerator in an amount to be canputed by multiplying: (i) one-fifth (l/5) of the number of kilowatt-hours in excess of 235 million kilowatt-hours generated by the Cogeneration Facility and delivered to the Point of Inter- connection with Vernon, provided that, the number of kilowatt- hours so canputed shall not exceed 470,000 kilowatt-hours; times (ii) the average rate for electric energy (in dollars-per-kilowatt-hour) during the year for which the payment determination is made, charged by Edison to resale customers as filed with the Federal Energy Regulatory Carmission (currently Edison I s TCXJ-R rate, or such successor designations as may fran time to time be applied).. 5.9.3 In the event that Vernon and Edison agree to a method whereby Vernon is fully canpensated by or receives full a};propriate credits from Edison for actual line losses, Cogenerator shall be relieved of any further line loss payments to Vernon. Vernon will pass through to Cogenerator any refunds that may eventually be received by Vernon from Edison in respect to said line loss canpensation or credits to the extent that Cogenerator has paid funds to Vernon as provided for in this Section 5.9. -14- 1 , , 11 f -I . 6.0 Rate Mjustments - The Transmission Service Rate for Firm Transmission Service provided for herein shall be adjusted after ten (10) years (120 months). Said rate adjustment shall take effect on the one hundred twenty-first (121) month after the Firm Operation Date. Thereafter, said rate shall be further adjusted at the time of each new Rate Case Design Study approved by the City Council. Transmission Service Rate adjusbnents shall be made in accordance with the formula specified in Appendix A attached hereto. 7.0 Pa,yment 7.1 Vernon shall render a monthly billing to Cogenerator for Transmission Service for the preceeding month. The amount of the bill ing shall be the monthly charge computed in accordance with the charges provided for in Article 5 and Article 6. 7.2 Cogenerator's payment obligations shall be reduced ~ one-half (50%) for the total number of hours of any period of time during which interruption or curtailment of Firm Transmission Service was necessitated as a result of the exercise by Vernon of its rights under Section 4.1 and Section 4.2 of this Agreement, or which was the result of the occurrence of an uncontrollable circumstance pursuant to Article 11 hereof, provided that said interruption or curtailment results in a capacity penalty or reduction in capacity payments received by Cogenerator pursuant to the Edison Agreement. In such event, the monthly fee charged to Cogenerator pursuant to Section 5.2 hereof shall be reduced for each occurrence of said curtailment by an amount equal to the result of dividing: -15- \ ) ~ .. (i) the Transmission Service Rate times the CUrtailment Capacity times the number of hours, or portion thereof, during which said interruption or curtailment of Firm Transmission Service was necessitated times me-half; by (ii) the total number of hours in the monthly billing pericx1. For the plrposes of this Agreement, the term "Curtailment Capacity" shall mean the difference obtained by subtracting (a) the actual Capacity of Both Cogeneration Facilities permitted to be delivered into the Vernon System, fram (b) the 58,000 kilowatt Firm Transmission Capacity of Both Cogeneration Facilities; or in the event that only one Cogeneration Facility is developed, said term shall mean the difference obtained by subtracting (x) the actual Capacity permitted to be delivered into the Vernon System, from (y) the Firm Transmission Capacity of 29,000 kilowatts. 7.3 Curtailment which was the result of the exercise by Vernon of its right under Section 4.3 and Section 4.7 of this Agreement shall result in the amount of the bill being pro-rata reduced for the total number of hours of curtailment during the period for which the bill was rendered, provided thatr said interruption or curtailment results in a capacity penalty orreductim in capacity payments received by Cogenerator plrsuant to the Edison Agreement. In such event, the monthly fee charged to Cogenerator pursuant to Section 5.2 hereof shall be reduced for each occurrence of said curtailment by an amount equal to the result of dividing: -16- \ ) .. (i) the Transmission Service Rate times the Curtailment Capacity times the number of hours, or portioo thereof, during which said interruptioo or curtailment of Firm Transmissioo Service was necessitated; by (ii) the total number of hours in the IOOnthly billing period. 7.4 Bills which are not paid in full within thirty (30) days after receipt thereof shall thereafter bear interest at a IOOnthly rate equal to prime plus one percentage point as specified by Bank of America, Los Angeles, California, pro-rated by days until payment is made; provided that, if bills are not paid in full within ninety (90) days after receipt thereof, Vemon shall have the right to disconnect the Point of Interconnection with Vernon and Vemon's obligation to provide Firm Transmission Service hereunder shall cease until all bills due are paid by Cogenerator. However, Cogenerator' s ooligations to make payments shall continue in force until such time as this Agreement is terminated pursuant to Article 29. 7.5 Vemon shall render bills for costs of all Transmission Facilities and Special Facilities required to provide or continue Firm Transmission Service. Payment of those bills shall be subject to the same conditions set forth in Section 7.4; provided further that, Cogenerator shall pay all bills for Transmission Facilities and Special Facilities which it is obligated to pay pursuant to Section 5.4 prior to the Operation Testing Date. 7.5.1 Vernon shall give Cogenerator ninety (90) days advance notice of additional costs for said Transmission Facilities and Special Facilities, including any such costs which Cogenerator may be obligated to pay prior to the Operatioo Testing Date. -17- ~,:i _. ~~-- -;,-<-,~-',._,.:..",.~;'. ";,_.'__,,,::,,,,_"';. ~_~_.'."..,,~-.:" l ~ 8.0 No Dedication of Facil i ties - No undertaking by one Party to the other under any provision of this Agreement shall constitute the dedication of that Party's system or any portim thereof to the other Party or to the public, nor affect the status of Vemon as an independent municipal utility or Cogenerator as an independent entity. 9.0 Indemnification 9.1 Each Party shall indemnify the other Party, its officers, agents and employees against all loss, damage, expense and liability for injury to or death to person, or injury to property, except as provided in Article 10, caused by the indemnifying Party's engineering, design, construction, ownership, maintenance or operatim of or making of replacements, additions or betterments to, that Party's works or facilities used in connection with this Agreement by reason of anissim or negligence, whether active or passive. '!he indennifying Party shall, m the other Party's request, defend any suit asserting a claim covered by this indemnity. '!be indemnifying Party shall pay all costs that may be incurred by the other Party in enforcing this indemnity. 9.2 The provisions of this Agreement have been designed under the assumption that Vernon's cost of capacity and energy purchases from Edison will not be adversely impacted by the arrangement provided for in this Agreement. Therefore, it is understood and agreed that Cogenerator will indemnify and hold Vernon harmless against Cogenerator' s pro-rated share of any and all additional costs and liabilities incurred by Vemon, inCluding increased charges that Vemon is required to pay to Edison and expenses incurred by Vemon in defending against an Edison attempt to increase such charges, due to a revision by Edison, or an -18- attempt by Edison to revise, the rates or dlarges at which &Uson sells capacity and energy to, Vernon, in the event that Edison has included in its filed resale rate under Section 205 of the Federal Power Act additional costs arising out of or related to the Firm Transmission Service provided for in this Agreement. Such indemnification shall be co-extensi ve both as to dollar amount and to the timing of any and all adverse monetary impact experienced by Vernon, resulting from the arrangement provided for in this Agreement, in connecticn with Vernon's capacity and energy pJrchases from Edison. Vernon will pass through to Cogenerator any refmds that may eventually be received by Vernon from Edison in respect to said issue and to the extent that Cogenerator has paid fmds to Vernon as provided for herein. Vernon shall bill Cogenerator in accordance with the provisions of Article 7 hereof for any indemnification required pursuant to this Section 9.2. 10.0 Liabili~ 10.1 Except for the obligations cited herein, nothing in this Agreement shall be construed to create any duty to, any standard of care with reference to or any liability to any person not a Party to this Agreement. 10.2 Neither Vernon, its officers, agents, or employees shall be liable for any claims, demands, costs, losses, cause of action, or any other liability of any nature or kind, arising out of the engineering, design, construction, ownership, maintenance or operation of, or making of replacenients, additions or betterments to the Cogeneration Facility by Cogenerator or any other person or entity, or for the exercise of the curtailment provisions p.1rsuant to Article 4 resulting in the curtailment of Firm Transmission Service. -19- . 10.3 Neither Vernon, its officers, agents or employees shall be liable for damages to the Cogeneration Facility caused by an electric disturbance on the Vernon System, or on the system of another, whether or not the electric disturbance results fran the negligence of Vernon. 10.4 Except where specifically stated in this Agreement to be otherwise, the duties, Obligations and liabilities of the Parties shall be several and not joint. 10.5 Nothing contained in this Agreement shall be construed to create an association, trust, partnership or joint venture or impose a trust or partnership duty, obligatioo or liability on or with regard to either Party. 10.6 Cogenerator hereby releases Vernon, its councilmen, officers, employees, agents and attorneys from any and all claims and demands arising based upon violatioo of state and federal antitrust laws out of the negotiation and execution of this Agreement including any positicns asserted in such negotiations or conduct taken respecting the subject matter of this Agreement of whatever nature, anticipated, known or unknown prior to the date of this Agreement. Cogenerator expressly waives the provisions of Section 1542 of the Civil Code of the State of California, reading as follows: "1542 Certain Claims Not Affected by General Release. A general release does not extend to claims which the creditor does not know or suspect to exist in his favor at the time of executing the release, which is known by him must have materially affected his settlement with the debtor. n 11.0 Uncontrollable Forces - Neither Party shall be liable to the other for failure to perform its obligations hereunder, except for the Obligation to make -20- . , . . payment of money subject to Section 7.2, if the failure is due to strikes, lockouts, labor disturbances, revocation of land rights, riots, sabotage, vandalism, war, acts of God, or the plblic enemy, unavoidable accidents or other matters beyond the reasonable control of and without the fault or negligence of the Party so obligated. Upon the cessation of the mcontrollable circumstances, the obligations of the Parties heremder shall recamlence and the Parties shall continue to diligently perform all obligations mder this Agreement. 12.0 Control and Maintenance of Facilities - The Transmission Facilities and Special Facilities shall at all times be and remain in the exclusive possession and control of Vernon and this Agreement shall not be construed to grant to Cogenerator any rights of ownership in or possession of any of those facilities. 13.0 Effective Date and Term 13.1 This Agreement shall be effective when duly executed ~ both Parties and shall continue in force for twenty (20) years fran the later of the Firm Operation Date or such similar date for the other cogeneration facility to be developed by Cogenerator as contemplated in Section 5.2 hereof, unless terminated p,lrsuant to Article 29. 13.2 Notice of any degree of curtailment moor Article 4 shall not be construed as constituting notice of termination mder this Article 13. 14.0 Assignment or Transfer of Interest 14.1 Any assignment or transfer by a Party of its interest in this -21- . , Agreement which is made without written consent of the other Party shall not relieve the assigning or transferring Party fran primary liability for any of its duties and <i>ligations under this Agreement, and in the event of such assignment or transfer, the assigning or transferring Party shall continue to remain primarily liable for payment of any and all money due the other Party as provided under this Agreement, and for the performance and observance of all other covenants, duties and obligations to be performed and observed under this 1\greement by the Party to the same extent as though no assignment or transfer has been made. 14.2 Whenever an assignment or a transfer of a Party's interest in this Agreement is made with the written consent of the other Party, the assigning or transferring Party's assignee or transferee shall expressly assume in writing the duties and obligatiOns under this 1\greement of the assigning or tranSferring Party and, within thirty (30) days after any such assignment or transfer and assumption of duties and obligations, the assigning or transferring Party shall furnish or cause to be furnished to the other Party a true and correct copy of such assignment or transfer and assumption of duties and obligations. Upon furnishing of such assignment or transfer, the assigning or transferring Party shall be released fran all its obligations lD'lder this 1\greement. 15.0 Waiver - Any waiver at any time by either Party of its rights with respect to a defualt under this Agreement, or with respect to any other matters arising in connection with this Agreement, shall not be deemed a waiver with respect to any subsequent default or other matter. -22- 16.0 Cqptions - All indexes, titles, subject headings, section titles and similar items are provided for the purpose of reference and convenience and are not intended to be inclusive, definitive or to affect the meaning of the contents or scope of this Agreement. 17.0 Choice Of Laws - This Agreement shall be construed and interpreted in accordance with the laws of the State of Califomia. 18.0 GoverrnnentRl Jurisdiction and Crnlpl:lpnce with Law 18.1 This Agreement is subject to the jurisdiction of those govermnental agencies having control over either Party or this Agreement. The Parties shall take all reasonable action necessary to secure all required governmental approvals necessary to construct and operate the Cogeneration Facility. The Parties shall at all times confo~ to all applicable laws and regulations. 18.2 Vemon shall not be obligated to accept delivery of Capacity and Energy generated by the Cogeneration Facility until all required governmental authorizations and pe~its listed in Appendix B attached hereto are first obtained and copies thereof are sul:xni.tted to Vernon. 18.3 Cogenerator shall maintain any governmental authorizations and permits required to legally operate the Cogeneration Facility. If Cogenerator fails to maintain such authorizations and pe~its, Vernon may refuse to accept delivery of Capacity and Energy hereunder after giving reasonable advance written notice. -23- 19.0 Land Ri(1hts - Cogenerator hereby grants to Vernon for the term of this Agreement all necessary rights-of-way, easements or irrevocable licenses to install, operate, inspect, maintain, replace, and remove any Special Facilities required to be located on property leased or CMIled by Cogenerator, and to inspect the Cogeneration Facility, including adequate and continuing access rights on property leased or CMIled by Cogenerator, and Cogenerator agrees to execute all other grants, deeds, or documents as Vernon may require to enable it to record those rights-of-way, easements, or irrevocable licenses. 20.0 ~tering 20.1 Vernon shall provide, install, and maintain in and out kilowatt-hour meters, in and out pulse recorders, and instrument transformers at a mutually agreed upon designated location at Cogenerator's expense. The out-meters shall be used to record and indicate the integrated demand for each half-hour and to measure kilowatt-hour deliveries of Energy from Cogenerator into the Vernon System. The in-meters shall be used to record and indicate the integrated demand for each half-hour and to measure kilowatt-hour deliveries of any energy from Vernon to Cogenerator. Meters and pulse recorders for measurement of reactive VOlt-ampere hours shall also be provided. All costs for installation, maintenance, administration, inspection and testing of said meters shall be borne by Cogenerator. 20.2 All meters used to determine deliveries of Energy and Capacity hereunder shall be sealed and the seals shall be broken only upon occasions when the meters are to be inspected, tested or adjusted by Vernon personnel. -24.... . , 20.3 Vernon shall inspect and test all meters upon their installation and at least mce each year thereafter. Vernon shall give reasonable notice of the time when any inspection or test shall take place to Cogenerator, and Cogenerator may have representatives present at the test inspectien. If a meter is found to be inaccurate or defective, it shall be adjusted, repaired or replaced in order to provide accurate metering. 20.4 If a meter fails to register, or if the measurement made by a meter during a test varies by more than two percent (2%) from the measurement made by the standard meter used in the test, adjustments shall be made correcting all measurements made by the inaccurate meter for: 20.4.1 The actual period during which inaccurate measurements were na.de, if the period can be determined1 or if not, 20.4.2 The period imnediately preceding the test of the meter equal to ene-half the time from the date of the last previous test of the neter 1 provided that, the period covered by the correction shall not exceed six (6) months. 20.4.3 Cogenerator shall be responsible for resolving all disputes arising from metering accuracy of Edison's neters with Edison. 20.5 Cogenerator, after reasonable notice to Vernon, shall have the right of access to all metering and related records. 21.0 Gen~ral Technical ReQpirements 21.1 Cogenerator shall design, construct, maintain, and Operate the Cogeneration FaCility. Said facility and related equipment shall meet all requirements of applicable codes and all standards of Prudent Electrical Practices. -2.5"';' ). 21.2 Vernon agrees to design, construct, operate and maintain its Transmission Facilities and Special Facilities in a manner consistent with good utility standards and Prudent Electrical Practices. 21.3 Cogenerator shall provide Vernon with specifications of all major electrical equipnent and facilities associated with the generator and protectioo thereof for review at least two (2) months prior to the scheduled Operation Testing Date. If Cogenerator fails to do so, Vernon may refuse interconnection until two (2) months after the specifications are submitted to Vernon. Cogenerator shall give written notice to Vernon at three (3) month intervals of the estimated Operation Testing Date. If Cogenerator fails to notify Vernoo, Vernon may at its optioo refuse interconnection for a period not to exceed three (3) months fran the date of actual notice. 21.3.1 Vernon agrees to provide Cogenerator with construction schedules for the Transmission Facilities and Special Facilities and to advise Cogenerator of any changes to same. 21.3.2 Cogenerator shall change its facilities and equipnent as may be reasonably required by Vernon to meet current or future requirements of the Vernon System. 21.4 Cogenerator shall not cause, as the result of its interconnection, any reductioo in the quality of service being provided to Vernon customers. 21.4.1 Abnormal voltages, frequencies, radio or T'J interference or Harmonics shall not be permitted. 21.4.2 Cogenerator shall not cause interference with the electrical or structural integrity of Vernoo facilities. 21.5 Cogenerator shall provide synchronizing relays at the main generator breaker as required. Inductioo starting, automatic synchronizing or -26- ) manual synchronizing shall be supervised by a synchronizing check relay. Inductioo starting will be permitted only when the inrush current will not exceed limits specified by Vernon which limits shall be in accordance with good utility practice. Synchronous generatioo shall include loss of excitation relays. 21.6 Cogenerator shall' naintain its equipnent in good operating order. The Generator and related electrical equipment shall be subject to periodic inspection by Vernon. If Cogenerator fails to provide proper routine naintenance of said equipnent in accordance with good utility practice, Vernon shall have the right to disconnect the Point of Interconnection with Vernon after providing reasonable advance written notice and Vernon's obligation to provide Firm Transmission Service heret.mder shall cease t.mtil appropriate corrective action is taken. 21.7 Parallel operation of the Cogeneration Facility with the Vernon System shall be with the permission of the Vernon System dispatcher. Vernon reserves the right to separate the Cogeneration Facility from the Vernon System without notice due to a Vernon System Emergency as determined at the time by the Vernon System dispatcher. The Vernon dispatcher may notify and separate the Generating Facility from the Vernon System in order to maintain Vernon's Electric System Integrity. Vernon shall promptly notify Cogenerator when such separation is no longer necessary. 21.8 Cogenerator shall provide equipnent necessary to inhibit manual or automatic reclosing to an energized line so that the Interconnection Facility cannot be established with the Generator out of phase with the Vernon System. Cogenerator shall not be permitted to energize a deenergized Vernon circuit. -27- j }. . 21.9 The Cogeneration Facility shall be capable of generating at a power factor, between .90 lag and .95 lead. If necessary, Cogenerator may be required to naintain voltage levels and reactive support for the Vernon System. 21.10 Protective Devices such as fuses, relays, and circuit breakers necessary to immediately remove the fault contribution into the Vernon System from the Cogeneration Facility shall be owned, operated, and maintained by Cogenerator. eanplete maintenance records must be maintained and be available for Vernon review. If Cogenerator fails to maintain and keep operational necessary Protective Devices, Vernon shall have the right after reasonable notificaticn to disconnect the Point of Interconnection with Verncn and Vernon's obligation to provide Firm Transmission Service hereunder shall cease until such time as necessary corrective actions have been performed. Cogenerator's obligations shall remain in force. 21.10.1 Cogenerator shall provide overcurrent voltage restrained relays to detect faults in the Vernon line to which the Cogeneration Facility is connected. These relays shall separate and lock out the Cogeneraticn Facility from the Vernon System until the Vernon System restabilizes and/or the dispatcher reauthorizes parallel operaticn. 21.10.2 Cogenerator shall provide under/over frequency relays to separate the Cogeneration Facility fran the Vernon System in case of sustained under/over frequency conditions. 21.10.3 Cogenerator shall provide reverse power relays to separate the Cogeneraticn Facility in the event of loss of the prime mover. -28- , . ~ ,. ) . .. 21.10.4 Cogenerator shall provide over/under voltage relays to separate the Cogeneration Facility fran the Vernon System if the line voltage exceeds limits designated by Vernon, which limits shall be in accordance with Prudent Electrical Practices. These relays shall also prevent paralleling of the Generator if the line voltage is not within said limits or if the line is deenergized. 21.10.5 Cogenerator shall provide indicators in the form of alarms, meters, and armunciators designed to monitor Generator parameters such as current, watts, vars, temperature and any other applicable point to give its operator a clear assessment of the operation of the Cogeneratioo Facility. 21.10.6 All Protective Devices installed to protect the Vernon System from the Cogeneratioo Facility infeed during abnormal conditions are subject to review and approval by Vernon, such awroval not to be unreasonably withheld. All Protective Devices at the Point of Interconnection with Vernon shall be utility grade. 21.10.7 Vernon reserves the right to observe the checkout and testing of all Protective Devices. Assemblies involving the sequential operation of devices shall be tested to ensure that the devices in the sequence function properly and in the order intended. Relay settings of Protective Devices shall be reviewed with Vernon. The correctness of control wiring shall be verified by either actual electrical operatioo of the canponent cootrol devices or individual circuit checks by electrical circuit testers. 21.10.8 Any generatioo failure which may result in unnecessary disturbance to the Vernon System must be pranptly removed fran service. -29- ( , .. ) ... " . .. 21.11 Cogenerator shall provide disconnects, capable of being locked in the open position to isolate the Cogeneration Facility from the Vernon System. Said discamects shall provide open or closed visible indicatioo. 21.11.1 Cogenerator shall notify the Vernoo dispatcher prior to scheduling cxmnencement or ceasing parallel operatioo with the Vernon System. The Vernoo dispatcher must be notified of the status and operatioo of the discamects prior to and after each operatioo. 21.12 If Cogenerator fails to canply with any of the provisions of this Article 21 or fails to correct any of the conditions set forth herein, Vernon shall have the right to disconnect, after providing reasonable advance written notice, the Point of Interconnection with Vernon and Vernon's obligatioo to provide Finn Transmission Service hereunder shall cease until such provisions are complied with or such conditions are corrected by Cogenerator. Cogenerator's obligations shall remain in force. 22.0 Notices -MY notice, demand or request required or pennitted .to be given by either Party to the other and any instrument required or permitted to be tendered or delivered by either Party to the other may be so given, tendered or delivered, as the case may be by depositing the same in any United States Post Office with postage prepaid, for transmission by certified or registered mail, addressed to the Party, or personally delivered to the Party, at the address designated in this Agreement. Changes in such designatioo may be made by notice similarly given. All written notices shall be directed as follows: -30- . .. <f; ~ (' To Vernon: City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Attn: City Administrator To Cogenerator: S\Dllaw Cogeneratioo Partners I 8530 Wilshire Blvd., Suite 401 Beverly Bills, CA 90211 23.0 Qperation of the C0generation Facili~ - Cogenerator shall Operate the Cogeneration Facility, subject to the following provisions: 23.1 The Cogeneration Facility and Protective Devices shall be operated and maintained in accordance with applicable utility industry standards and good engineering practices with respect to synchronizing, voltage and reactive power control. 23.2 The Cogeneration Facility shall be operated with all of the Protective Devices in service whenever the Generator is connected to or is operated in parallel with the Vernon System. Any deviatioo for brief periods of Emergency or maintenance shall only be by mutual agreement. 23.3 Cogenerator shall keep Vernon notified as to the scheduled outages of the Generator, including any changes thereto and shall provide Vernon with reasonable advance notice regarding its scheduled outages for the Generator. Vernon shall provide reasonable advance notice to Cogenerator as to the Vernon / System I s maintenance and scheduled outage requirements affecting Vernon I s ability to provide Firm Transmission Service. Reasonable advance notice is defined as follows: -31- . " . .. ... \- l SCHF.nrlT.m OOTAGES EXPECl'ED IIJRATIQN ADVANCE mrICE 'lO l?ARTIES Less than one day 24 hours One day or more 1 week One week or longer 6 months Notification of outage date and duration should be by telephone and directed as follows: Vernon: Electrical Dispatch Center Cogenerator: Cogeneration Facility Control Center Written notification plrsuant to Article 22 shall also be provided for scheduled outages of one day or more. 23.4 Cogenerator shall naintain an operating log with records of real and reactive pc1t/er flow, changes in operating status, outages, Protective Devices operations and any lUlusual conditions found during inspection. In addition, Cogenerator shall maintain records applicable to the Generator, including the electrical characteristics of the Generator and settings or adjustments of the Generator control equipnent and Protective Devices. Such information shall be available to Vernon upon request and copies of such operating logs and records shall be provided, if requested, to Vernon within thirty (30) days. 23.5 If at any time Vernon has reason to suspect the integrity of any of the Protective Devices and such suspected loss of integrity is hazardous to ~32.,..: ~ . , ~ the Vernon Electric System Integrity, Cogenerator shall demonstrate, to Vemon's satisfaction',the correct calibratioo and operation of the equipnent in question. 23.6 Cogenerator shall test all Protective Devices with qualified personnel at intervals of not more than four (4) years. 23.7 Cogenerator shall notify Vemon at least fourteen (14) calendar days prior to the initial energizing of the ~int of Interconnection with Vernon and initial testing of the Protective Devices. Vernon shall have the right to have a representative present at such time. 23.8 Cogenerator shall, to the extent IX>ssible, provide reactive power for his own requirements. Cogenerator shall not deliver excess reactive power to Vernon unless otherwise nutually agreed upon between the Parties. 24.0 Di~tes 24.1 Any dispute arising between the Parties relating to interpretation of the provisions of this Agreement or to performance of the Parties hereunder shall be reduced to writing by the disputing Party, stating the canplaint and the proposed solution, and submitted to the other Party's manager responsible for administration of this Agreement, whose interpretation and decision thereon shall be incorporated into a written document, which shall specify that it is the final decision of such manager, and a copy of said docmnent shall be fumished to the disputing Party within ten (10) days following receipt of the disputing Party's written canplaint. 24.2 The decision of the manager pursuant to Section 24.1 shall be final and conclusive thirty (30) days after receipt of such copy by the disputing Party unless, within such thirty (30) day period, the displting Party fumished a :...'33- .. \.- I l written appeal to such manager. Following receipt of such appeal, a joint hearing shall be held at a mutually acceptable date within fifteen (15) days, at which time t:he Parties shall each be afforded an opportunity to present evidence - in support of their respective positions. SUch joint hearing shall be conducted by one authorized representative of Vernon, and one authorized representative of Cogenerator which representatives may be assisted by other persons deemed necessary by either Party. Pending final decision of a dispute pursuant to this section, the Parties shall proceed diligently with the performance of their obligations under this Agreement and maintain the status quo of the Calditim under dispute unless a mutually acceptable interim solution is develOped. 24.3 The final decision by the Parties' authorized representatives shall be made within fifteen (15) days after presentation of all data affecting the dispute, and shall be reduced to writing. The decision shall be final and conclusive. 24.4 If the Parties' authorized representatives cannot reach a final decision regarding the dispute within fifteen (15) days, any remedies which are provided by law may be p.lrsued. 25.0 Disclaimer - Any review by Vernon of the design, constructim, operatim, or maintenance of the project is solely for the information of Vernon. By making such review, Vernon makes no representation as to the economic and technical feasibility, operational capability, or reliability of the Cogeneration Facility. Cogenerator shall in no way represent to any third party that any such review by Vernon of the Cogeneration Facility, including but not limited to, any review of the design, construction, operation, or maintenance of the Cogeneratim Facility -34- l." .. . Facility by Vernon is a representation by Vernon as to the econanic and technical feasibilitY',operational capability, or reliability of said facilities. Cogenerator is solely responsible for economic and technical feasibility, operational capability, or reliability thereof. Vernon shall not be liable to Cogenerator for, and Cogenerator shall defend and indemnify Vernon fram, any claim, cost, loss, damage, or liability arising from any contrary representation concerning the effect of Vernon I s review of the design, construction, operation, or maintenance of the Cogeneration Facility. 26.0 Interconnection Facilities Desiqn - The Interconnection Facilities shall be designed, installed, operated and maintained at Cogenerator I s expense. The design, installation, operaticn and maintenance of the Interconnection Facilities shall be in accordance with applicable codes and good engineeering practice. 27.0 Ownership and Operation of Interconnection Faciliti~s 27.1 Cogenerator shall not commence parallel operation of the Cogeneration Facility until written ag>roval for operation of the Interconnection Facility has been given by Vernon, such ag>roval not to be unreasonably withheld. 27.2 Cogenerator shall own, operate and maintain the Interconnection Facilities. 28.0 Taxes - Cogenerator shall pay ad valorem taxes and other taxes properly attributable to the Cogeneration Facility. If such taxes are assessed or levied against Vernon, Cogenerator shall pay Vernon for such assessment or levy. -35- . . , . 4 29.0 Termination/Abandonment 29.1 This Agreement shall terminate if the Firm Operaticn Date does not occur within five (5) years of the date of the Agreement execution. 29.2 Vernon shall have the right to terminate this Agreement if Cogenerator continually fails to make Firm Transmission Service payments as set forth in this Agreement. 29.3 Vernon shall have the right to terminate this Agreement if Cogenerator abandons the Cogeneration Facility. The Cogeneration Facility shall be deemed to be abandoned if Cogenerator discontinues operation of the Cogeneration Facility with the intent that such discontinuance be per-manent. Such intent shall be conclusively presumed by either (i) Cogenerator's notice to Vernon of such intent, or (ii) Cogenerator's operation of the Cogeneration Facility in such a manner that no Energy is generated therefrom for two hundred (200) consecutive days during any period after the Firm Operation Date unless Cogenerator has continued to make payments to Vernon for Firm Transmission Service, or unless otherwise agreed to in writing by the Parties. 29.4 Vernon shall have the right to terminate Firm Transmission Service upcn the termination of the Edison Agreement. At such time, Vernal may effectuate a p:>wer plrchase agreement with Cogenerator. 29.5 If after this Agreement becomes effective, any governmental agency having jurisdiction over either Party or this Agreement imposes an lmreasonably burdensome condition or obligation on either Party with respect to such Party's obligations lmder this Agreement, and the affected Party has challenged such ruling to the best of its abilities and such challenge has been unsuccessful, the affected Party may terminate this Agreement upon thirty (30) days written notificatial to the other Party, unless an alternative resolution, agreeable to both Parties, can be reached. "';36.,... ..' ~, . . . . 4., '. 30.0 Sale of Cogeneration Facility 30.1 If Cogenerator. desires to sell the Cogeneration Facility and has made an offer to or received an offer from any public utility or municipal utility (as those terms are defined in the California Public Utility Code) then, Cogenerator shall pranptly offer to Vernon, or any entity designated by Vernon in its sole discretion, the right to purchase the Cogeneration Facility. Vernal or any such entity designated by Vernon, shall have up to sixty (60) days following the offer to accept Cogenerator I s offer to reach agreement with Cogenerator. 30.2 If Cogenerator abandms the Cogeneratim Facility during the term of this Agreement, Vernon, or any entity designated by Vernon in its sole discretion, shall have the right to plrchase the Cogeneration Facility at fair market value. 31.0 Priority of 1\greement - If there is a conflict between this Agreement and any aJ;:pendix, the provisions of this document shall govern. Each Party shall notify the other imnediately upon the determination of the existence of any such conflict. 32.0 Previous Communications - This Agreement contains the entire agreement and understanding between the Parties, their agents, and employees as to the subject matter of this Agreement, and merges and supercedes all prior agreements, commitments, representations, and discussions between the Parties. No Party shall be bound to any obligations, conditions, or representations from prior agreements, conmitments, representations and discussion between the Parties with respect to the subject matter of this Agreement. -37- ,t 1 ( ... . . . 4. A' ~ 33.0 Third Party ~eficiaries - 'lhis Agreement is for the sole benefit of the Parties and shall not be construed as granting any rights to any persoo or entity other than the Parties or imposing obligatioos on either Party to any person or entity other than the Parties. 34.0 Spccessors and A$signs - This llgreement shall be binding upon and inure to the benefit of the respective successors and assigns of the Parties. 35.0 Fuel Use Franchise Fee - Cogeneratoracknowledges that Vernon has reduced its transmission fees in recognition that Cogeneration Facility will consume natural gas as its primary fuel source and Vernon will therefore receive additional franchise fees from Southern California Gas CDnpany at the rate of one percent (1%) of ngross billingn of all natural gas CQ'lsumed in the Cogeneration Facility_ If Cogenerator should consume a fuel other than natural gas in the Cogeneration Facility, and if Vernon does not receive franchise fees for the use by Cogenerator of such alternate fuel, then Cogenerator shall pay Vernon a fee equal to one percent (1%) of the purchase price of the alternate fuel which is consumed in the Cogeneration Facility, except for alternate fuels used for up to three hundred (300) hours per year for testing or reliability purposes. -38- ,.. , ~ 'If I I> " , . I{ 1\ 36.0 Insuranc~ 36.1 Oogenerator shall obtain and maintain in force as hereinafter provided comprehensive general liability insurance, including contractual liability coverage, with a combined single limit of not less than Five Millicn . Dollars ($5,000,000) for each occurrence. '!be insurance carrier or carriers and form of policy shall be subject to review and approval by Vernon, such approval not to be mreasonably withheld. 36.2 Prior to the date Cogeneration Facility is first operated in parallel with the Vernon System, Oogenerator shall (a) furnish a certificate of insurance to Vernon, which certificate shall provide that such insurance shall not be terminated nor expire except on thirty (30) days prior written notice to Vernon, (b) maintain such insurance in effect for so long as Cogenerator's Cogeneration Facility is operated in parallel with Vernon's electric system, and (c) furnish to Vernon an additional insured endorsement with respect to such insurance in substantially the following form: aIn consideraticn of the premium charges, Vernon is named as additional insured with respect to all liabilities arising out of Oogenerator's use and ownership of Oogenerator's facilities. The inclusion of more than cne insured mder this policy shall not operate to impair the rights of one insured against another insured and the coverages afforded by this policy will apply as though separate :"39- 11 , . .. I \ J " It ,. " policies had been issued to each insured. '!he inclusion of more than one insured will not, however, - operate to increase the limit of the carrier's liability. Vemon will not, by reason of its inclusion under this policy, incur liability to the insurance carrier for payment of premium for this policy. Any other insurance carried by Vemon which may be applicable shall be deemed excess insurance and Cogenerator's insurance primary for all purposes despite any conflicting provisioos in Cogenerator's policy to the contrary." 36.3 If Cogenerator fails to comply with all of the provisions of this Article 36, Cogenerator shall, at its own cost, defend, indemnify, and hold harmless Vernon, its directors, officers, employees, agents, assigns, and successors in interest from and against any and all loss, damage, claim, cost, charge, or expense of any kind or nature including direct, indirect or consequential loss, damage, claim, cost, charge, or expense, including attorney's fees and other costs of litigation resulting from the death or injury to any persoo or damage to any property, including the personnel and property of Vernon, to the extent that Vernon would have been protected had Cogenerator complied with all of the provisions of this Article 36. -40- \; ~ "f j" " j. 1 \. . .. ... 1,. .. 37.0 Further Ass~rances - Each Party, on request of the other Party, will perform such, acts as may be reasonably necessary or advisable to carry out the intent of this Agreement. IN WITNESS WHEREOF, the Parties have executed this Agreement Q'1 . CITY OF ~ BY. U!onis C. Malburg, Mayor A'rI'EST: BY. Bruce V. Malkenhorst, City Clerk APPRO\1E[) AS ro FORM: BY. David B. Brearley, City Attorney SUNIJ\W <:roENERATIOO PARTNERS I a California Limited Partnership By: Sunlaw Operating Corporation, a California corporation, its General Partner BY. E. Jay Lobit, Vice President -41- '.....1. ,..... ... I' H .. J ..jJ IiIl t l. .. .. ~ Appendix A Pursuant to Article 5 of this Agreement, the rate for Firm Transmission Service shall be initially adjusted after ten (10) years (120 months) from the Firm Operation Date. Such adjustment shall be based on cost and demand information contained in the most recent Report on Rate Design of the Municipal Light Department, City of Vernon, California, prior to the date for such adjustment, as approved by the City Council. Further adjustments shall be made at the time of each succeeding Report on Rate Design. All such adjustments shall be made in accordance with the following formula: Rate for Firm Transmission Service = (in dollars per kilowatt per roonth) MC+OC+D+R+LP(0.15) CG(12)+ASD where, MC == Annual Miscellaneous Costs (in dollars per year) OC = Annual Operating Costs (in dollars per year) D = Annual Depreciation Allowance (in dollars per year) R = Vernon rate base multiplied by rate of return on rate base granted in Edison roost recent CRJC rate case LP = Annual In Lieu Payment (in dollars per year) 0.15 = 15 Percent Factor to be Applied to In Lieu Payment CG = Canbined Firm Transmission Capacity of Cogeneration Projects Operating on the Vernon System (in kilowatts) 12 = twelve months per year ASD = The sum of City of Vernon roonthly retail sales Peak Demand Adjusted for Losses (in kilowatts-month per year) ~ H . " .... ,. .. .,. " 4.1.r . 4. APPENDIX B . ~ ~J , ~ " Governmenra 1 Agenqy Goverr;unental authorizations and permits required by Cogenerator: Federal Enerw Regulatory Conmission u.s. Dept. of Energy, Economic Regulatory Administration u.s. Environmental Protection Agency South Coast Air Quality Management District Los Angeles County Sanitatim District City of Vernon L.A. Juncticn and Union Railroads (U.S. Growers only) Authorization Qr Pepnit Qualifying Cogeneration Facility Status Fuel Use Act Exemption Prevention of Significant Deterioration Review Exemption Authority to Construct Permit Industrial Wastewater Discharge Permit Conditional Use Permit for Cogeneration Building and Safety Permit Irrevocable lease for Anmonia liquid and gas pipelines