Resolution No. 6960 1 RESOLUTION NO. 6960 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND AUTHORIZING THE EXECUTION OF AN ADDENDUM TO THE AGREEMENT FOR PROFESSIONAL SERVICES (CITY OFFICE ADDITION) AS AMENDED BY AND BETWEEN THE CITY OF VERNON AND BOYLE ENGINEERING CORPORATION PERTAINING TO THE REDESIGN OF CITY HALL FACILITIES FOR ADA COMPLIANCE 3 4 5 6 7 WHEREAS, by Resolution No. 6331 on October 5, 1993, the 8 City an Agreement with Engineering Council approved Boyle 9 Corporation for Professional Services (City Offices Addition) to 10 perform the Programming Phase; and 11 WHEREAS, the ci ty Council amended said Agreement by Resolution No. 6565 on December 20, 1994 (Amendment No.1), by 12 13 Resolution No. 6698 on October 17, 1995 (Amendment No.2), by Resolution No. 6759 on March 26, 1996 (Amendment No. 3 which also 14 repealed Amendment No.2), and by Resolution No. 6881 on November 5, 15 16 1996 (Addendum to Amendment No.3); and WHEREAS, the City of vernon needs architectural and 17 engineering services to design renovations in order to bring City 18 Hall facilities into compliance with the Americans with Disabilities 19 Act (ADA); and 20 21 WHEREAS, at the request of the city, Boyle Engineering Corporation has submi tted a proposal for an addendum to said Agreement as amended for additional services as described in the 22 23 24 letter dated April 7, 1997, for "Additional Services for ADA/ Title 24 Accessibility Compliance at Basement, 1st and 3rd Floors, City Hall Renovation and Expansion Project" to which is attached a 25 26 Task Exhibit for "Engineering Services Estimate - ADA Compliance 27 Bsmt, 1st & 3rd Floor "; and 28 .. 1 WHEREAS, Kevin Wilson, Director of Community Services, has 2 recOmmended that the City Council approve said addendum to the 3 Agreement at a lump sum cost of Ten Thousand Three Hundred Forty- five Dollars and No Cents ($10,345.00) as set forth therein. 4 5 6 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: 7 SECTION 1: The City Council of the City of Vernon hereby 8 finds and determines that the recitals contained hereinabove are 9 true and correct. 10 SECTION 2: The City Council of the City of Vernon hereby 11 approves said Addendum for additional services under the Agreement 12 for Professional Services (City Offices Addition), a copy of which 13 Addendum has been presented to the City Council concurrently with 14 this resolution, and the City Council hereby orders said Addendum to 15 be received and filed by the City Clerk. 16 SECTION 3: The City Council of the City of Vernon hereby 17 authorizes the Mayor and the City Clerk to execute said Addendum 18 for, and on behalf of, the City of Vernon. 19 SECTION 4: The City Clerk of the City of Vernon shall 20 certify to the passage of this Resolution, and thereupon and 21 thereafter the same shall be in full force and effect. 22 APPROVED AND ADOPTED this 20th day of May, 1997. 23 . 7 -~'Ylr-' 24 25 26 ATA BRUCE V. MALKENHORST, City Clerk 27 28 -2- . 1 STATE OF CALIFORNIA ) )ss COUNTY OF LOS ANGELES ) 2 3 I, BRUCE V. MALKENHORST, ci ty Clerk of the ci ty of 4 Vernon, do hereby certify that the foregoing Resolution, being 5 Resolution No. 6960, was duly adopted by the city Council of the 6 City of Vernon at a regular meeting of the City Council duly held on 7 Tuesday, May 20, 1997, and thereafter was duly signed by the Mayor 8 of the City of Vernon. 9 /- ~ 10 BRUCE V. MALKENHORST, City Clerk 11 (SEAL) 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 -3- l30YLE E/7G//7EEl~/~7G CO/~PO/~/~T/O/'7 1501 Quail Street P.O. Box 3030 714 / 476 - 3300 Newport Beach, CA 92658-9020 FAX 714 / 721 - 7142 Mr. Kevin Wilson, PE Apri125, 1997 CITY OF VERNON 4305 Santa Fe Avenue Vernon, California 90058 Additional Services for Repair and Retrofit of Maintenance Building and Warehouse Building Enclosed is the Task Exhibit for design and drafting work required to provide modifications described by the memorandum dated Apri125, 1997, attached. The engineering services for the tasks involved are considered additional services to the existing contract dated April 9, 1996, with the City of Vernon. The fee for providing these services is based upon Boyle's standard time and materials rates. The total not-to-exceed amount is $4,966. If the Task Exhibit conforms with the requirements of the City of Vernon please sign below, indicating acceptance of this Addendum to the Contract. Please return one signed copy to me. Boyle Engineering Corporation Daniel G. Whyte, P Managing Engineer Accepte by City of V ~ on,~` ~~~~dc'' Name: Rrh('p V Malkenhorst Title: City Administrator Date: July 14 , 1997 Enclosures ES-V25-300-00/mcp AUTHLTR3.DOC CITY COUNCIL ~ DAVID B. BREARLEY LEONIS C. MALBURG City Attorney Mayor FAX: (818) 330-5818 THOMAS A. YBARRA KEVIN WILSON Mayor Pro-Tem Director of Community Services & Water FAX: (213) 588-2761 Wm. "BILL" DAVIS Councilman KENNETH J. DeDARIO Director of Light & Power H. "LARRY" GONZALES FAX: (213) 583-1983 Councilman DAVE TELFORD W. MICHAEL McCORMICK Fire Chief Councilman FAX: (213) 581-1385 BRUCE V. MALKENHORST CITY HALL LOUIS RosENKRANTZ City Administrator/City Clerk 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 Police Chief FAX: (213) 581-7924 TELEPHONE (213) 583-8811 FAX: (213) 581-1178 June 12, 1997 City Council City of Vernon Honorable Members: The City previously approved an agreement with Boyle Engineering for Professional Services. (City Office Addition) which included retrofit work on the Warehouse which sustained severe earthquake damage. Boyle has reviewed the structural integrity of the warehouse building and determined that the roof is not capable of withstanding. the additional loads required by the retrofit. Additional engineering work is required. This has been reviewed by the Director of Community Services and the City Attorney, and it is hereby recommended that approval be granted for Boyle Engineering to perform the additional engineering work at a cost not to exceed $4,996. Very truly yours, Bruce V. Malkenhorst City Clerk GJO/hr s. ~ • T F ~4. 11 1 - - ~ 1 1 ? ~ 1 s, -fir r~~~~~ < 1 > 44 i~+ _A -t\ \ ~ \ t 1, R }.5 rr 7~7 ~ ~ j, x . ~ i ~ i 'a ri ` r- ~ 1~ 9 ~/1• June 10, 1997 TO: Bruce V. Malkenhorst, City Administrator FROM: Samuel "Kevin" Wilson~Director of Community Services & Water SUBJECT: WAREHOUSE Boyle Engineering has reviewed the structural integrity of the Warehouse. The situation is far worse than expected. As you are aware the Warehouse suffered damage in the last earthquake. Several columns sustained severe cracks. In the interim the City has installed large wooded posts to help support the roof structure. It was our assumption that if the roof were tied to the wall, that the loads could be transferred to the entire pane l through the roof structure. Unfortunately the roof structure is under designed and extensive work is necessary. The agreement for the Engineering of the retrofit work did not include this additional work.. Therefore it is recommended that Boyle Engineering's contract be amended to include this. additional work at a cost not to exceed $4,996. SKW:ps cc: City Attorney F30YLE E~'7G/nEER/!7G CORPOR/=IT/O/7 1501 Quail Street P.O. Box 3030 714 / 476 - 3300. Newport Beach, CA 92658-9020 FAX 714 / 721 -7142 Mr. Kevin Wilson, PE April 28, 1997 CITY OF VERNON 4305 Santa Fe Avenue Vernon, California 90058 Additional Services for Repair and Retrofit of . Maintenance Building and Warehous~_Buildin~ Enclosed is the Task Exhibit for design ~.nd drafting work required to provide modifications _ described by the memorandum dated Apri125, 1997, attached: The engineering services for the tasks involved are considered additional services to the existing contract dated April 9, 1996, with the City of Vernon. The fee for providing these services is based upon Boyle's standard time and materials rates. " " The total not-to-exceed amount is $4966. If the Task Exhibit conforms with the requirements of the. City of Vernon please sign below, indicating acceptance of this Addendum to the Contract. Please return one signed copy to me. Boyle Engineering Corporation, Daniel G. Whyte, PE Managing Engineer Accepted by City of Vernon Name: Title: Date:. Enclosures AUTHI ,"rI23.DOC TASK EXHIBIT ~Y~R~P~~ TQ:_ Kevin Wilson -DATE:° ar~s~ FRQM:' Marc Pange JQB NOs ES-V25-300-00 SUBJECT: ENGINEERING SERVECES ESTIMATE - ADDITIONAL RETROFIT DESIGN CLIENT; City of Vernon ' I~nASTE~ FILE:lmcpwerrton ~ROJr Maintenance & Warehouse Buildings REVS ~a~sr Autnor:'MCP CLASSIFICATIONS PRWCIP s~i4R n;soc ~rrnoR ~ I c~sR~ TQTAi. cone- ' REPRq 7pTA~,, Eritat~a Frx3taR ENONR DRFT' cn~ 'LABOR'. PuTER QTHER RATES :150 125 95 65 51 52 ' Mlsc TASK l~ESCRkPTION' MANH4URS 1 structural Design 24 0 8 3408 120 3528 2 Roof Plan, Details, Specifications 8 4 2 1364 74 1438 'o a o o ,o ;o o Q o a o 0 o a a 0 0 o o a >~o a o """'a 0 0 ,o a o o TOTALS ' 4772 194 0 496fi BASIS Q~ ESTIIUTATE 1) See attached memorandum from project structural engineer dated April 25, 1997. 2) Prepare roof plan, parapet detail, and related specifications required for demolition and replacement of existing roof membrane with new built=up-roofing membrane. Page 1 r t MEMORANDUM ;i Apri} 25, 1997 T0: ~ Marc Pange BEC/ES ~RqM: Robert Hawthorne BBC/AL City of Vernon Maintenance. and. Warehouse Retrofit SUBJECT: In a telephone conversation on April. 23, 1997 with Mr. Richard Lucas, I brought to his attention the findings of my structural design of the warehouse retrofit. Referencing the Scope of Services I noted that we specifically indicate the. wall panels will be attached to: the roof structure to enhance the stability of the building in a seismic event and will not necessarily be designed to the 1444 UBC. However in the design it was determined the roof structure only has appraximateiy half of the capacity needed to resist the seismic:. loads. Since retrofit design of the. roof deck is beyond the scope. of work, I was requesting direction from Richard__ Ri.chard_ then indicated that I prepare a task exhibit to identify the out of scope services.: Qn the warehouse building the magnitudeof design forces exceed the capacity of the plywood -roof structure as it is currently constructed. The tiltup wall panels can be attached to .the roof, - ~ however the roof cannot transfer the loads to theend walls. Several options are available to modify the structure to obtain the required transfer: of seismic loads. 1, Remove a portion of-the existing roof deck and replace the plywood and joists with larger elements. The balance of the roof would require additional nailing to meet the requirements. This option would require the roof membrane to be completely removed and re~Iaced. 2. Provide new interior braced frames or shearwalls at locations to allow the existing roof deck nailing to work as presently constructed. This option could interfere with the operations of the facility. 3. Provide new exterior buttresses at the column locations to provide the required resistance. My recommendation is to proceed with option 1 to upgrade the facility to transfer the seismic loads to the shearwalls. At presen# the project is on hold until we receive direction and the notice to proceed. ` ~ ALv2S20031lreh BQ~~ .ti 5 F30YLE E/7G!/-7EE/~//7G CO/t'!~O/~/=IT/On 1501 Quail Street P.O. Box 3030 ~ 714 / 476 - 3300 Newport Beach, CA 92658-9020 FAX 714 / 721 - 7142 Mr. Kevin Wilson, PE `Apri 28, 1997 CITY OF VERNON 4305 Santa Fe Avenue Vernon, California .90058- ' Additional Services for Repair and. Retrofit trf . Maintenance Building and Warehouse Buihding - Enclosed is the Task Exhibit for design and ck'afting work required to provide modifications - - described by the memorandum dated April ~S, 1997, attached. The engineering services for the tasks involved are considered additional services to the existing contract dated Apri19, 1996, with the City of Vernon. The fee for providing hese services is bated upon Boyle's standard time. and materials rates. ' t' The total not-to-exceed amount is $4,96.b. If the Task Exhibit conforms with: the ruirements of the City of Vernon please sign below, indicating acceptance of this Addendurr~r'to the Contract. Please return one signed copy to me. Boyle Engineering Corporation • Daniel G. Whyte, PE Managing Engineer Accepted by City of Vernon Name: Title: _ --Date: Enclosures AUTHI .l'1t3.DOC ti , MEMORANDUM ' April 25, 1.997 TO: ~ Marc Pange BEC/ES ~RQM: Robert Hawthorne BBC/AL City of Vernon Maintenance and Warehouse .Retrofit .SUBJECT: In a telephone conversation on April 23, -1997 with Mr. Richard Lucas, I brought to his attention the findings of my structural design of the warehouse: retrofit. Referencing the Scope of Services I noted that we specifically indicate the wall panels will be attached to :the roof structure to enhance the stability of the building in a seismic event and will not necessarily be designed to the 1994 UBC. However in the design it was determined the roof structure only has approximately half of the capacity needed to resist the seismic loads.. Since retrofit design of the roof deck is beyond the scope of work, I was requesting direction from Richard__ Richard.- then indicated that I prepare a task exhibit to identify the out of scope services. On the warehouse building the magnitude of design forces exceed the capacity of the plywood roof structure as it is currently constructed. The tiltup wall panels can be attached to the roof, i however the roof cannot transfer the loads to the end walls. Several-options- are available to modify the structure to obtain the required. transfer of seismic loads. 1. Remove a portion of the existing roof deck and replace the plywood and joists with larger elements. The balance of the roof would require additional nailing to meet the requirements.. This option would require the. roof membrane to be completely removed a»d replaced. 2. Provide new interior braced frames or shearwalls at locations to allow the existing roof deck nailing to work as presently constructed. This option could interfere. with the. operations of the facility. 3. Provide new exterior buttresses at the column locations to provide the required resistance. My recommendation is to proceed with option to upgrade the facility to transfer the seismic Toads to the shearwalls. At present the project is on .held ~intil vve receive direction and the notice to proceed.. ` ~ ALv2S20031/reh er++[..l/ JC c r c MEMORANDUM -CITY OF VERNON 9~ t~ DATE: October 6, 1999 TO: Bruce V. Malkenhorst City Administrator FROM: Samuel Kevin Wilson ~ Director of Community Services & Water RE: Change Order No. 5 -Increase Size of Steel Rods for Retrofit of Warehouse Attached is Change Order No. 5 to provide for the increase in size of certain steel rods for the retrofit of the warehouse building. The increased rod sizes will match the clevis sizes per the manufacturer's recommendation. The cost for this modification is $2,881.00. Boyle Engineering Corporation has reviewed the cost for the work and has determined it to be reasonable.. It is recommended that you authorize the Department to proceed with this change order work. Attachment cc: Dolores Fonseca, Purchasing ~ 1~~ /11~'~~~ MEMO-BVM-CCO#5 CITY OF VERNON COMMUNITY SERVICES DEPARTMENT CONTRACT CHANGE ORDER; NO. 5 SUPPLEIl~IENT NO. _ SHEET 1 OF 1 SHEETS PROJECT: Construction of City Hall Addition and Remodel CONTRACT NO. TO: Amelco Construction CONTRACTOR REQUESTED BY: City You are hereby directed to-make the herein described changes from. the plans and specifications or do the following described woxk not included in the plans and specifications on this contract. CHANGE IN PLANS -ADJUSTMENT OF COMPENSATION City and Contractor hereby agree to adjustment of compensation due to the changed character of the following item of work: The diameter of certain rods shown on Drawing No. S7.2 are to be increased in size to match the clevis size per the manufacturer's recommendation in accordance with RFI #62. A total of 28 out. of 44 rods ;will be affected by this change. 1. 16 rods to be increased from 1" to 13/8" diameter to match no. 4 clevis. 2. 8 rods to be increased from 1'/4" to 1'/2' diameter to match no. 5 clevis. 3. 4 rodsto be increased from 13/8" to 1'/Z" diameter to match no. 5 clevis. A lump sum price of $2.,881.00 will be made. for this modification. This sum constitutes full compensation, including all mark-ups, for this change. RFC~:IF:TZTT~•1~ SEP 1 5 1999 BY: >~-d~ Contract .Amount (Base Bid) $ 5,176,000.00 Amount of Tl'iis Change Order $ 2,881.00 Amount of Previous Change Order $ 80,921.00 Total Change Orders $ 83,802.00 Modified Contract Amount $ 5,259,802.00 By reason of this order the time of NO adfUStment completion will be adjusted as follows: _ _ Approved:. Date: Director of ommunity Services & Water We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved thatwe will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specitied, and will accept as full - payment therefor the prices shown above. p~ p~ • ~ ~ 1 f Accept te:, ~ ~i / Contractor: /Jh~ GUN~'41~?G gy. Title: ~ ~ ~1/~--- xc: Finance/Resident Engine r r je t File/Contractor CCQ+kS--STEELRCDS CITY ADMINISTRATOR/CITY CLERK'S OFFICE INTER-DEPARTMENT MEMORANDUM DATE: October 30, 2000 T0: Kevin Wilson Director of Community Services and Water FROM: Bruce V. Malkenhorst City Administrator Kevin, Victor Opincar communicated to me that it is his understanding that the contract for the construction of the City Hall Annex ended October 28, 2000, and that you have cited Amendment No.3 which states that the construction and administration phase terminates when the final certificate of payment to the contractor is issued and that you told him they are responsible until such time. Please advise me why we have this difference of opinion. BVM/ng ~1 I304~LE 1501 .Quail Street ~`t,~ Newport Beach, CA-92660-2726 1~v` TEL: (949)476-3300 FAX: (949)721--7142 www.boyleerigineering:com Kevin Wilson, Director of Community Services and Water October 11, 2000 CITY OF VERNON 4305 Santa Fe Avenue .Vernon, CA 90058 City Offices Addition Agreement The contractor's contractual completion date'for the City Offices Addition is October 28, 2000, and it is now evident that their actual completion date will be at least nine months past that date. We discussedacltional cotilpensat>on=for Boyle's construction phase services after the weekly meeting on September 27, 2000. ~~~Y~sterday, you cited Amendment No 3 to cur Agreement ,which states the construction and administration phase tei•lilinafes'~wheri'the final certificate of ~s:n~ ~ . ~ . ~~paynieiit to i~~e~cont>•actor is issued ~ We have had a good working relationship with the City and we would Tike this to cohtinue; however, we think it unfair to expect Boyle to assume. expenses for construction delays .beyond our control. Therefore, I have requested Mr. Victor Opincar, .Vice. President with Boyle, to contact the City Manager regarding our expenses beyond the contractor's contractual completion date. Mr. Opincar has conversed. with the City Manager with regards to this project from its inception. Boyle Engineering Corporation ~ A11en J. Randall; PE Managing Engineer cc:~`~tc-(~~~~ii~car ~ 01~ ~ G~ ~ ~ ~ U~ ~ ES-B99-190-00/gjd/Letter to Kevin Wilson2:doc 'Pj~9 ~ BOYLE ENGINEERING CORPORATION ®Recycletl Paper _ ¦ I o:. .......::iS i::ii::i::i n:[::::.[{ ~:i -'i::i:::. i<: ' ~ ; i;:ii;x'iii;:i;oi~oi~oi;p:ir '•:ii::iii::iii:::i::is:i:Y::::i::i:r,:::is{tii;oi;oii ISSUE DATE": MM D . a/.111.11®........± ::::::F fly R~l~. :::i::::~::~:~;:::::::::::::::::::::. . .~~r . . ~ . .....;:::<::>::::>::>::>::><:<:::>:::<:>:>::>::::>:<:::>::::::i::;:i:#:i:::::Y<:;:i;:;:>::::>::::>::::>:<:::: ~ ::::>::::;<:::>::>:::<%:i:«:::i::i::i:::;:i::i:;~>i::tY2::>i:<;>:;:::ii::i::i::i> :::;.: ~ a><:>.;;;>:.;:.;:.;;;:::;<::.>:.;;:.;:.;;:.;:.;:.;:.;::.;;::.>;:.;:.;:.;;:.;::;::::: 9/98 122 ;:;<:.x;;::;• .::.::.::.:::~:::,;.;:««:;:<:<::::;;; ~;:iii:;:::i::ii:::;:i::i:<::<::<::<:<:<:::;>;::<:::::;x::z:;; ::;;:;:.;:isii::ii:<::;::;:::<:;::: ;:«<;;:;:::;::;:«:;::;::;:,;:::;::;::: ::;:iii:;;;::»::;:;::<::<:::ii::i;<::;;: <<:»>:>:::>::>::>:;: ~::<::<:;:>:»:>:::<::<::<:;:::<<::i:::::>:::zi:::.;...:.................... . PROOUCeR :THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE Dealey, Renton & Associates :POLICIES BELOW. License #0020739 3 Hutton Centre suite 450 COMPANIES AFFORDING COVERAGE Santa Ana CA 92707 coMPANY A Hartford Fire Ins. Co. E LETTER E LETTER Y B Design .Prof. Ins. t:0. ......................C COMPANY INSBoDIe En :neerin Cor orati On !...LETTER.... ~ ~ ..............~~,~qa~i.............. 1501 Quail Street coMPANY Newport Beach CA 92660.7350 LETTER D COMPANY E . LETTER v >:'.'11.LR'A. ~ ':::>:::»»:::'::>::::>:::<z:::>:>':<:::>::?>::>:>::>:!>::>::::::::::>::>::::»::>>::::::>::>:>:»:~:::::>::::>::>::i:::>:>::>t:::#:#?##;::;:;'•;:>,'.;:>;:;:r::;;:>:;:>:#:?::>;:p: ';'•';'!#>3::>;'::>;:::>;:::>;:::>:::::z;>:::::::;»>::>::>>:#::~::::>:::>:<:>::<:»::>::>::::>::::>:<i:'rtl;:::;# :::::::::::::::::E:::::i::::>::>::::>::::z:;:;:t:::i: .~tl!...........Q.. ~ ::::::THIS:.I.::: T.::::::ERT:F S O C I Y THAT THE POLICIES OF INSURANCE. LISTED BELOW HAVE BEEN ISSUED TO THE INSURED. NAMED ABOVE FOR THE POLICY PERIOD. INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH- RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEflEIN iS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. CO : TYPE OF INSURANCE POLICY NUMBER :POLICY EFFECTNE POLICY EXPIRATK)N LIMITS LTR; DATE (MMIDD/YY) DATE (MM/DD/YY) GENERAL LIABILITY . . A 57CESSS9265 12/31/98 12/31/99 :GENERAL AGGREGATE $ 2,000,000...,. X .COMMERCIAL GENERAL LIABILITY ~ :PRODUCTS COMP/OP AGG $ 1 000 000 r i ! CLAIMS MADE ; x :OCCUR, ;PERSONAL & ADV. INJURY. $ 1 , 000, OOO OWNER'S 8 CONTRACTOR'S PROT. F1{CH OCCURRENCE $ 1 , OOO, 000 ................300 000...... E FIRE DAMAGE (Any one tire) , ED EXPENSE (Any one person)$ 10,000 .....E ~ ' ; M - - AUTOMOBILE LIABILITY :COMBINED, SINGLE ANY AUTO ~(/~,~,~',(J~1 :LIMIT... . 9 1 lV ~ ...............................i$..... ALL OWNED AUTOS L Y :SCHEDULED AUTOS ~ (ODlper~) R HIRED AUTOS (-~%1~~~~ BODILY INJU) Y ?NON-OWNED AUTOS ~ ~ ? (er accident i GARAGE LIABILITY ? i C~- .................i$................................... a PROPERTY DAMAGE $ 66r ~ EXCESS LIABILffY ; r`~ :EACH OCCURRENCE $ UMBRELLA FORM :AGGREGATE $ OTHER THAN UMBRELLA FORM WORKER'S COMPENSATION STATUTORY LIMITS ' r.J EACH ACCIDENT $ ~D ///%'l I E DISEASE POLICY LIMIT $ EMPLOYERS' LIABILITY (iC~ DISEASE -EACH EMPLOYEE : S OTHER B PROFESSIONAL LIABILITY PL700825-01 12/31/98 12/31/99 :PER CLAIM AND 1,000,000 :ANNUAL AGGREGATE DESCRIPTION OF OPERATK)NSiLOCATIONSNEHICLESISPECIAL ffEMS FOR PROFESSIONAL LIABILITY COVERAGE THE AGGREGATE CITY OFFICES ADDITION LIMIT IS THE TOTAL INSURANCE AVAILABLE FOR ALL CERTIFICATE HOLDER IS NAMED AS ADDITIONAL INSURED AS RESPECTS GENERAL COVERED CLAIMS PRESENTED WITHIN THE POLICY PERIOD. ----LIABI-LI-T-Y.-- THE LIMIT WILL BE REDUCED BY PAYMENTS OF INDEMNITY (AI/X) AND EXPENSE. £HT11=1: •~k::::F1~~ L~7i::::.€€€>;>€€€€€€€€€€>€ss>~>»'>?s>i<'>'s:`<>`:•>':'~';>'';>>>'::• :::.::::.::::.:.:::....::<„''z€€€€€€€€€€€€z<:;:>::::>:::>::€<s>:>:<':>:€::€:€:>€<::>s>?#>>::>::>:?<':€:'•> :::>:::>::>:>::>~:<<:<:>~:::>»::>::>:::'.: ..........:..~..'C~......4.. EA..:::.::::::::::::::::::. N ELLX~'f C!~.::C.,:::.::::::::~N.:::::::::::::::::::::::::.:::::.::::.:::::::::::::::::::::::::::::::::...::::::::::::::::::::.~::::::::::::::.::::.::.:::::::::::.~ SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL XDGBHDNG281C7(~XXXXXX CITY OF VERNON MAIL 30 * DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE ATTN: CITY ADMINISTRATOR LEFT, BI9R~UgXDEiFXHXX~@C~SI41~)9XDf~l!(H~NCXXAGR~fSIItXDO(~I~AXDObDC19I9XXXXXXXXX 4035 SANTA FE AVENUE IUD[]4X'X~(g(X~6D(XBp?OI~XQ[~Q>.CX7AIfXtZC>'Bbl(gYgQ~(Xp~pXEXX~OQgrAF186~10]IDC6(9~p(XXXXX VERNON CA 90058.0805 i :':'#iAUTHORIZED REPRESENTATIVE I AA /~~i ~y ) '~R:E'7! .2 ..A..aI .........~.I~:. ..X94::::::<:::::::;:;`:;?.:~:::::::::>:::::: ::::.::::::::::::';`:;:.::::::::s2;'•:`::;%':;:;::::::::::':~::::::::::::::`::::::::::::::::::::;.:?::^;.:'`;:;:;;',.::::::: ;:;:.,s~::ii:?:::';:;:y',:;:i::::>:':::::::::':::':::::;:;:.:•:::;:•!:..:.:::.~<;, f``r E17 ~ ~ GENERAL ENDORSEMENT In consideration of an additional premium of N/A , it is hereby understood and agreed that the following applies: [ X ] ADDITIONAL INSURED - GN001013 CITY OF VERNON is/are Additional Insured/s as respects to work done by Named Insured. [ X ] NOTICE OF CANCELLATION It is understood and agreed that in the event of cancellation of the Policy for any reason other than non-payment of premium, 30 days written notice will be sent to the following by mail. CITY OF VERNON ATTN: CITY ADMINISTRATOR 4035 SANTA FE AVENUE VERNON, CA 90058-0805 In the event the policy is canceled for non-payment of premium, 10 days written notice will be sent to the above. Policy No.: 57CESSS9265 Effective Date: 12/31/98 Insurance Company: Hartford Fire Ins. Co. Issued to: Boyle Engineering Corporation Issue Date: 12/29/98 utho ' ed resentative l~ I~~ r 2959 Monterey-Salinas Highway Monterey, CA 93940-6439 info@dpic.com http: / /www. dpic. com ~p~C DPIC COrilIJlrileS 408.649.5522 800.227.4284 Orion Capital 408.649.1734 Fnx December 9, 1998 City Clerk City of Vernon 4305 Santa Fe Avenue Vernon, California 90058 Re: Insurance for City of Vernon. Named Insured & Policy Number (s) Bo, ly e En ing Bering Corporation City Clerk: I hereby certify that the certif cite of insurance attached hereto and made a part hereof by reference truly and accurately represents the above-cited insurance policies and the insurance coverage of each for the named insured issued by DPIC Companies.- The City of Vernon will be provided with thirty (30) days written notice of cancellation except for nonpayment of premium. I certify that I am an officer of the insurance carrier named herein and that I am authorized to sign this certificate on behalf of said insurance carrier. Sincerell~y, 7 TT~7 A T'~ DLSIGl\TPR'lJl'L'JSIiJl~TLiL4C)il"V ST~'iNCi. i..•~1V;S r"1L11 t Larry Moonan Vice President & Regional Leader ~,~y-~~, Design Professionals Security Insurance The Connecticut Insurance Company Cmnpany of Har ford Indemnity Company l:ITY COUNCIL DAVID B. BREARLEY City Attorney LEONIS C. MALBURG FAX: (818) 330-5818 Mayor KEVIN WILSON THOMAS A. YBARItA Director of Community Services & Water Mayor Pro-Tem FAX: (213) 588-2761 Wm. "BILL" DAMS KENNETH J. DeDARIO Councilman Director of Light & Power H. "LARRY" GONZALES PAX: (213) 583-1983 Councilman DAVE TELFORD W. MICHAEL McCORMICK Fire Chief Councilman FAX: (213) 581-13$5 BRUCE V. MALKENHORST CITY HALL LOUIS ROSENKRANTZ City Administrator/City Clerk 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 Police Chief FAX: (213) 581-7924 TELEPHONE (213) 583-8811 FAX: (213) 581-1178 June 10, 1997 Daniel G. Whyte, PE Managing Engineer Boyle Engineering Corporation P.O. Box 3030 Newport Beach, CA 92658-9020 . Re: Addendum to Agreement for Professional Services Dear Mr. Whyte: Enclosed herewith for your records is a fully executed duplicate original of the above-referenced addendum to agreement. If you should have any questions, please do not hesitate to contact Mr. Kevin Wilson. Very-truly yours, CIT OF VERNON QZ'LC.ev ~ i~-O i J. Oro 0 C of Deputy ity Clerk GJO/hr Enclosure- cc: Kevin Wilson - - Director of Community Services ~~A~~ ~ ~7 0 t~~~~n~~~~aE:ii~ty ~~rvic~s F30YLE E/7G/nEEI~//7G CO/~POI~IaT/O!7 CONSULTING ENGINEERS/ARCHITECTS 1501 Quail Street P.O. Box 3030 714 / 476 - 3300 Newport Beach, CA 92658-9020 FAX 714 / 721 - 7142 Mr. Kevin Wilson, PE April 7, 1997 CITY OF VERNON 4305 Santa Fe Avenue Vernon, California 90058 Additional Services for ADA /Title 24 Accessibility Compliance at Basement, 1st and 3rd Floors Citv Hall Renovation and Expansion Project Enclosed is the Task Exhibit for design and drafting work required to provide modifications for disabled access in the existing City Hall building. The scope has been defined by the attached "Transition Plan -Americans with Disabilities Act Evaluation" provided by the-City of Vernon. The engineering services for the tasks involved are considered additional services to the existing contract dated April 9, 1996, with the City of Vernon. If the Task Exhibit conforms with the requirements of the City of Vernon please sign below, indicating acceptance of this Addendum to the Contract. Please return one signed copy to me. Boyle Engineering Corporation Daniel G. Whyt , PE Managing Engineer Accepted by City of Vernon c se~~ l Nam : Leonis C. albur~ Title: Mayor Date: ATTEST:. ~v A roved as to Form: Enclosures - pp Bruce V. Malkenhorst ES-V25-300-00/mcp City C 1 e rk AUTHLTR3.DOC David B. Brearle City Attorney TASK EXHIBIT aY~R~P~~E TO; Kevin Wilson DATE: arr~s~ FROM: Marc Pange JOB Nb: ES-V25-200-20 SUBJECT: 'ENGINEERING SERVICES ESTIMATE - ADA COMPLIANCE BSMT, 1ST i3~ 3RD'FLOQR CLIENT: City Of Vemon MASTER FILE:1mcplvernon PRO,i: City Hall Renovation & Expansion REVe ~aJ,-s~ Author: McP' CLAS$11=1CATIQNS a sENioa nssoc ~woR ufl~ TgTAL oM' R~PRQ TOTAL F]Jt3N EN6NR FIJGNR DgFT CAL LABOR PUTRR ^?HER RATES',($ - - - - 150 125, 95 ' 65 ' 51 'S2 ~,~5~ TASK 1 DESCRIPTION.'. ' MAN'HUUM~S ~ ~ 5 $ BASEMENT ~ Q 1 Draft Reference Floor Plan 2 12 970 1$0 '1150 2 Path of Travel Modifications 2 2 320 30 360 3 Door Hardware Compliance 4 2 510 30 540 4 Drinking Fountain Demo & Inst Specs 2 2 320 30 350 5 Audio Assistance Modifications 4 4 760 60 82Q 0 0 0 15T FLOOR 0 0 0 6 Draft Reference Floor Plan (Ext.) 2 12 970 18U 1150 7 Primary Entrance Modifications 1 1 160 ' 15 175 8 Reception Counter Modifications 2 4 450 60 510 - g Path of Travel Modifications 2 2 320 ' 30 350 10 Door Hardware Compliance 4 2 _ 510 ' 30 540 11 Audio Assistance Modifications 4 4 ''760 ' 60 ' 820 12 Reconfigure Existing Rest Rooms 4 12 1.'160 180 1340 0 0 0 3RD FLOOR 13 Draft Reference Floor Plan (Ext.) 2 6 5$0 90 670 14 Reception Counter Modifications 2 4 450 ' 60 ' 510 15 Audio Assistance Modifications 4 4 '760 ' 60 820 16 P. M. !Quality Control 2 250 0 250 TOTALS ` 9250 1095 0 10345`. BASIS OP' ESTIMATE 1) Draft basement level floor plan; integrate with document set in progress. 2) On-site survey to locate path of travel obstructions. Keynote plan; detail fix as required. 3) Locate non-complying door hardware, specify complying hardware as required. 4) Locate and specify removal of two(2) drinking fountains; Replace with complying fixtures. 5) Locate and specify complying visual fire alarms; Integrate w/ existing building alarm system. 6) Draft 1st floor plan (extension); integrate with document set in progress. 7) Specify main entry threshold removal /replacement with complying threshold; detail. 8) Design complying ht. HC counter in front of existing counter; Specify bell to ring in adjacent office. 9) On-site survey to locate path of travel obstructions. Keynote plan; detail fix as required. 10) Locate non-complying door hardware, specify complying hardware as required. 11) Locate and specify complying visual fire alarms; Integrate w/ existing building alarm system. 12) Design and draft complying mens and womens (indiv. occ.) rest rooms to replace existing at lobby. - Page 1 13) Draft 3rd floor plan (extension); integrate with document set in progress. 14) Design complying ht. HC counter in Light and Power office. 15) Locate and specify complying visual fire alarms; Integrate w/ existing building alarm system. 16) Project Management; document modification review. NOTE: Reference attached "TRANSITION PLAN" provided by City of Vernon for basis of scope. Page 2 H o g ~ U g ~ ~ r., 1 ~ O~ z ~ ~ c~ o ~ ~ a ~ ~ 8 EW-~ F' W ~ ~ Ud' V ~ ~ ~ ~ ~ a~~ ~ ~ ~~~a ~ ~ ~ ~ d ~ C4 w V ~ 3 Ax U ~ o ~ ~ $ ~ 1 a ° ~ ~ ~ ~ a~ ~ ~ o ~ ~ ~ ~ ~ E a a~ ~ ~ f+ U ~ d" z_ d U w~ z ~ o ~ ~ oo zN o~ ca Q ~Q HQ Q ~ ~ ~ ~ s g ~ ~ E ~ rn rn rn O ad' -o ~ ~ ° ~ ~ ~ ~ N~ w a ~o o a ~ w ~ a b ' ~ ~ > _ z ~ ~ ~ o ~ ~ b ~ ac, ~ ~ ~ ~ W U d v~ ~ a A ~ a; g 3 ~ U A~ ~ ~ a g c ~ A • a~i o ~ g ~ ' ~ ~ U p4 o y ~d i to f/1 b N ~ 8 ~ ~ N W o~ o ~ ~ ~ Z a ~ wa U ~ H w ?Wa ~ ~ -O~ ~ ~ n• . ~ o U ~ ~ ~ g o xo o~. b ~ ~ v @a ~ ~w W p. c~a Q r+ ~4 ~ •v O g 8 H~ z ~A g g g 0 H a ~ ~ ° w W ~ 3 Z~~ H U ~ a g ~ z~~ H M ' ~ 'a" ~ ' ~ 8 ~~w ~ ~ W A ~ r~ @ ~ A x GW7 ~ ~ ~ ~ ~ ~~H ~ ~ ~ ~ ~ ~ ~ ~ ~ ~x ~ ~ ~ b b~ 'o ~ a a ~ ~ w ~ ~ z a > ~ ~ H ~ ~ w o ~ ca o~ ~ o~ ~ F-'a U Qw ~ ~ CITY COUNCIL DAVID B. BREARLEY LEONIS C. MALBURG ~ I ' City Attorney FAX: (818) 330-5818 Mayor THOMAS A. YBARRA WIC'SON Mayor Pro-Tem Director of Community Services & Water FAX: (213) 588-2761 Wm. "BILL" DAMS Councilman KENNETH J. DeDARIO Director of Light & Power H. "LARRY" GONZALES FAX: (213) 583-1983 Councilman DAVE TELFORD W. MICHAEL McCORMICK Fire Chief Councilman FAX: (213) 581-1385 BRUCE V. MALKENHORST CITY HALL LOUIS RosENKRANTZ City Administrator/City Clerk 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 Police Chief FAX: (213) 581-7924 TELEPHONE (213) 583-8811 FAX: (213) 581-1178 May 15, 1997 City Council City of Vernon Honorable Members: The first floor of City Hall (police station) has not yet been retro- fitted to comply with the Americans with D~abi3it~s Act. The City currently has an agreement with Boyle Engineering which can be amended to provide architectural services to redesign the restrooms, counters, etc. for ADA compliance at a cost of $10,345. This has been reviewed by the Director of Community Services and the City Attorney, and it is hereby recommended that the agreement with Boyle Engineering be amended to provide said archite~'izrai`se~vices at a cost not to exceed $10,345. Very truly yours, Br ce V. Malkenh st City Clerk BVM/hr May 14, 1997. TO: Bruce. V. Malkenhorst, City Administrator FROM: Samuel "Kevin" Wilson~Director of Community Services & Water SUBJECT: AMERICANS WITH DISABILITIES ACT The Americans with Disabilities Act requires all public. buildings to be retrofitted to accommodate disabled individuals. With the recent construction of the third floor and the total proposed remodeling of the second floor. of the City Hall, this leaves .only the Police Station out of compliance. Joan Francone has stated that there may be some benefits in our insurance rates if the City is in compliance with-the regulations.. Due to these factors, it is recommended that Boyle Engineering have their agreement amended so that they may provide the Architectural Services to redesign the restrooms, counters, etc. to meet ADA compliance. Construction would take place some time in the future. Boyle Engineering has given me a cost of $10,345.00 to provide these services. If you foresee any further architectural services on the first floor, such as in the Library, or old City Attorney's offices, then this would be the time to either include those services in their contract at an additional cost, or wait on the ADA Architectural services until we have a firm idea of what we want to do on that floor., Either way, the restrooms on the first floor serve our .City Council Chambers and they should be made disabled accessible as soon as possible. Therefore it is recommended that Boyle. Engineers contract be amended to provide ADA Architectural services for the Police Station at a cost not to exceed $10,345.00. SKW:ps cc: City Attorney ~ ~ ~ Information to be entered when assigning new agreement# to system. CATEGORY (circle -one only) : L & P, GAS, GENERAL OR LICENSE AGREEMENTS # 1. .Approval date: ®~j # 1 a. Agreement #2. Title f Agreement: ~G~C~Qiri v.~ ~q ~c3/- oar. /t/~~~ a CS'e~-Pi IGC4+1 ~Q. ~ ~ 5 7 7 'rQ.~ ~ ~ ~ ~6 7 #3. Effective Date: (if different from approval date) #4. Expiration Date: (if applicable) OR #5. Expiration at .NONE. :AgrmntData