Loading...
Resolution No. 7034 c" "'" "'-J: 1 2 RESOLUTION NO. 7034 3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON AMENDING RESOLUTION NOS. 5111, 5466 AND 5805, WHICH PROVIDED FOR THE ESTABLISHMENT OF ELECTRICAL RATES TO BE CHARGED FOR ELECTRICAL ENERGY DISTRIBUTED AND SUPPLIED BY SAID CITY WITHIN ITS BOUNDARIES, BY (1) AMENDING ALL RATE SCHEDULES WHICH ESTABLISH A BASE ENERGY RATE (EXHIBITS "A", "B", "C", "D", "E", "F", "G", "I", "J", "K" AND "M", RESPECTIVELY); (2) MAKING ADDITIONAL AMENDMENTS TO RATE SCHEDULES GS-1, TOU-V, LS-1, LS-2, OL-1 AND TOU-G (EXHIBITS "A", "C", "D", "E", "F" AND "M", RESPECTIVELY); AND (3) ADDING NEW RATE SCHEDULE PA- TOU (EXHIBIT "P") 4 5 6 7 8 9 10 WHEREAS, the City Council of the City of Vernon adopted 11 Resolution No. 5111 on June 5, 1984, which provided for the establishment of rates to be charged for electrical energy distributed and supplied by said City within its boundaries; and 12 13 14 WHEREAS, the City Council of the City of Vernon adopted 15 Resolution No. 5805 on August 7, 1990, which established rate schedules GS-2 (Exhibit "B"), TOU-V (Exhibit "C") and TOU-G (Exhibit "Mil); and WHEREAS, the City Council of the City of Vernon desires to amend Resolution Nos. 5111, 5466 and 5805 in order to approve and adopt revised rate schedules for all schedules that provide 16 17 18 19 20 21 for a base energy rate, to wit: Schedules GS-1 (Exhibit "A"), 22 GS-2 (Exhibit "B"), TOU-V (Exhibit "C"), LS-1 (Exhibit "D"), LS-2 23 (Exhibit liE"), OL-1 (Exhibit ."F"), TC-1 (Exhibit "G"), D (Exhibit 24 "I"), PA-1 (Exhibit "J"), PA-2 (Exhibit ilK"), and TOU-G (Exhibit 25 "Mil); and 26 WHEREAS, the City Council of the city of Vernon further 27 desires to amend Resolution Nos. 5111 and 5805 in order to approve 28 and adopt additional changes to schedules GS-1 (Exhibit "A"), " <." 1 TOU-V (Exhibit "C") LS-1 (Exhibit "0"), LS-2 (Exhibit "E"), OL-1 2 (Exhibit "F"), and TOU-G (Exhibit "Mil), and to add new schedule 3 PA-TOU (Exhibit "P"). 4 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF 5 THE CITY OF VERNON AS FOLLOWS: 6 SECTION 1: The City Council of the City of Vernon 7 hereby finds and determines that the recitals contained 8 hereinabove are true and correct. 9 SECTION 2: That the rates, terms and conditions set 10 forth in the Rate Schedules GS-1 (Exhibit "A") , GS-2 (Exhibit 11 "B") , TOU-V (Exhibit "C"), LS-1 (Exhibit "Oil), LS-2 (Exhibit "E") , 12 OL-1 Exhibit "F"), TC-1 (Exhibit "G") , 0 (Exhibit "I"), PA-1 13 (Exhibit "JII) , PA-2 (Exhibit ilK"), TOU-G (Exhibit "M") , and PA-TOU 14 (Exhibit "P") , respectively, copies of which have been presented 15 to the City Council concurrently with this Resolution and which 16 are incorporated by this reference and made a part hereof as 17 though fully set forth at length, are hereby adopted as the City's 18 rates, terms and conditions for the distribution of the electrical 19 energy supplied by the City of Vernon, and the city Council hereby 20 orders said Schedules to be received and filed by the City Clerk. 21 SECTION 3: That in all other respects, Resolution Nos. 22 6228, 6202, 5805, 5760, 5466, 5111 and 5076 shall remain in full 23 force and effect and that the provisions contained in Resolution 24 Nos. 5805, 5760, 5466, 5111 and 5076 not consistent with or in 25 conflict with this resolution are hereby repealed. 26 III 27 III 28 III -2- " 1 '-.(" 2 certify to the passage of this resolution, and thereupon and SECTION 4: The City Clerk of the city of Vernon shall 3 thereafter the same shall be in full force and effect. 4 APPROVED AND ADOPTED this 7th day of October, 1997. 5 6 7 8 ATTEST: 9 / 10 BRUCE V. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 C:,,/ / A ./ ",,~p,c."?'t:...:.-;,~-t,t~~/ I .....~ (LEONIS C. LBURG, ayor '--' ./~ MALKENHORST, City Clerk -3- .. " "- 1 STATE OF CALIFORNIA ) )ss 2 COUNTY OF LOS ANGELES ) 3 I, BRUCE V. MALKENHORST, City Clerk of the City of 4 Vernon, do hereby certify that the foregoing Resolution, being 5 Resolution No. 7034, was duly adopted by the City Council of the 6 city of Vernon at a regular meeting of the City Council duly held 7 on Tuesday, October 7, 1997, and thereafter was duly signed by the 8 Mayor of the City of Vernon. 9 x 10 ~ BRUCE V. MALKENHORST, City Clerk 11 (SEAL) 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 -4- Exhibit "I" '. _ t ~_..-. - CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. D DOMESTIC SERVICE APPLICABILITY Applicable to domestic service including lighting, heating, cooking and power or combination thereof in a single-family accommodation. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Customer Charge $1.55 Energy Charge (to be added to Customer Charge): All kWh, per kWh . . . . . . . . . . . . . . . . . . . . 2.635C Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge. SPECIAL CONDITIONS 1. Enet:gy Cost Adjustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 2. In-Lieu of "(ax and Fljinchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 5076 Eff~ctive 12/06/83 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 1 Exhibit "A" , .If ... CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. GS-l GENERAL SERVICE APPLICABILITY Applicable to single- and three-phase general service including lighting and power. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Summer Winter Customer Charge . . . . . . . . . . . . . . . . . . . . . . . . . . . . $7.25 $7.25 Energy Charge All kWh, per kWh . . . . . . . . . . . . . . . . . . . . . . . 8.699(: 7.931(: Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge. SPECIAL CONDITIONS 1. Volta~e: Service will be supplied at one standard voltage. 2. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to service separately an X-ray installation, the billing will be increased by $1.03 per kV A of transformer capacity requested. 3. TempoI'al)' Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. SIll Effective 06/08/84 Resolution No. 7034 Effective 11/01/97 1 , Schedule GS-1 (cant.) ... 4. Energy Cost Acljustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 5. In-Lieu of Tax and Franchise Pa,yments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. 6. Excess Transformer C~acity: The amount of transformer capacity requested by a customer which is in excess of the applicable standard transformer size determined by the Utility as required to serve the customer's measurable kilowatt demand. Excess transformer capacity shall be available to all customers under this schedule and shall be billed at $1.03 per kV A per month. 7. Seasons: The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. Authorized by the CiQ' of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Effective 06/08/84 Resolution No. 7034 Effective 11/01/97 2 Exhibit "B" \ CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. GS-2 GENERAL SERVICE APPLICABILITY Applicable to single- and three-phase general service including lighting and power. This schedule is not applicable to customers with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use recording meters have been installed. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Demand Charge: All kW of billing demand, per kW* . . . . . . . . . . . . . . . . . $10.04 Energy Charge (to be added to Demand Charge): All kWh, per kWh . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.220C .(Subject to Contract Demand. See Special Condition No. 10) Minimum Charge: The Demand Charge plus the Energy Charge shall be subject to a monthly minimum charge of $200.85. SPECIAL CONDITIONS 1. Voltage: Service will be supplied at one standard voltage. 2. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined to the nearest kW. Authorized by the CiQ' of Vernon Ordinance No 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 1l/0l/97 1 Schedule GS-2 (cont.) .~~ 3. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute interval in the month. 4. Voltage Qiscount: The charges before adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3 % discount will be entitled to a 4 % discount. 5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt- hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 6. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to serve separately an X-Ray installation, the minimum charge will be increased by $1.03 per kV A of transformer capacity requested. 7. Temporat:)' Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. 8. Energy Cost Adjustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. Authorized by the CiQ' of Vernon Ordinance No 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 11/01/97 2 Schedule GS-2 (cont.) '" 9. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kV A per month. 10. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the kilowatt demand, whichever is less and is expressed in kilowatts. 11. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. 12. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. 13. Recording Meters: A recording-type meter shall be installed for all customers purchasing under this schedule and having peak requirements of 500 kW or more. Customers having recording-type meters are not eligible to purchase under this schedule and JllllSt be transferred to Schedule No. TOU- V. Authorized by the CiQ' of Vern~m Ordinance No 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 11/01/97 3 Exhibit "D" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. LS-l LIGHTING-STREET Mm HIGHWAY UTILITY -OWNED SYSTEM APPLICABILITY Applicable to street and highway lighting service supplied from overhead lines where the Utility owns and maintains the street lighting equipment. TERRITORY Within the city limits of the City of Vernon. RA TES Energy Curtailment Service Lamp Size-Lumens All Night Service Per Lamp Per Month Midnight or Equivalent Service Per Lamp Per Month Facilities Charge Per Lamp Per Month High Pressure Sodium Vapor Lamps 5,800 Lumens 9,500 Lumens 16,000 Lumens 22,000 Lumens 25,500 Lumens 47,000 Lumens $ 7.55 8.52 10.32 11.83 12.81 17.25 $ 6.94 7.46 8.61 9.51 10.08 12.46 $5.51 5.67 6.18 6.54 6.59 6.90 Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 5076 Effective 12/06/83 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 1 Schedule LS-1 (cont.) SPECIAL ~ONDITIONS 1. Standard E(p1ipment Furnished: Bracket or mast arm construction will be furnished. Where feasible with existing facilities, center suspension construction may be furnished. Enclosed luminaires will be furnished for lamps of 2,500 lumens, or larger, and open reflector lighting units will be furnished for lamps of 1,000 lumens. Such standard lighting equipment will be attached to wood poles. 2. Other than Standard EqJ.tipment: Where the customer requests the installation of other than the standard equipment furnished by the Utility and such requested equipment is acceptable to the Utility, the Utility will install the requested equipment provided the customer agrees to advance the estimated difference in cost installed between such equipment and standard equipment. Advances made in connection with such agreements become and remain the sole property of the Utility; as do the said equipment. 3. Hours of Service: Under the Utility's standard all night operating schedule approximately 4,140 hours of service per year will be furnished. 4. Removal or Modification of Equipment: Where street lighting service and facilities were ordered removed or modified by a customer and such services and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of such reinstallation a nonrefundable amount equal to the cost of removal or modification of the prior facilities and the estimated cost of such reinstallation. Facilities removed or installed remain the sole property of the Utility. 5. Energy Cost Acljustment: The rates above for all-night service are subject to adjustment as provided for in Resolution No. 7032. The applicable energy cost adjustment billing factors set forth therein will be applied to 4 kWh per month per 1,000 lumens for high pressure sodium vapor lamps. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 1l/0l/97 2 Schedule LS-l (cont.) 6. Energy Curtailment Service: a. Where the Customer requests the installation and/or removal of equipment in order to obtain Energy Curtailment Service, and such request is acceptable to the Utility, the Utility will comply with such request provided the customer first agrees to pay to the Utility the estimated installation cost for any additional equipment required and/or the removal cost of any equipment currently installed. Such payments will not be refunded and shall be paid in advance or in installments acceptable to Utility over a period of not to exceed three years. Facilities installed in connection with such request become and remain the sole property of the Utility. b. Under the Utility's midnight (PST) or equivalent service operating schedule, approximately 2,090 hours of service per year will be furnished . c. Facilities charges shall be applicable under this schedule only when the Utility has been requested to discontinue the existing service by the customer and the customer has stipulated that the facilities are to be left in place for future use. d. The rates above for midnight or equivalent service are subject to adjustment as provided for in Resolution No. 7032. The applicable energy cost adjustment billing factors set forth therein will be applied to 2 kWh per month per l,ooo for high pressure sodium vapor lamps. 7. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. Authorized by the CiQ' of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 0~/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 3 Exhibit "E" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. LS-2 LIGHTING-STREE"f MID HIGHWAY CUSTOMER-OWNED INSTALLATION APPLICABILITY Applicable to service for the lighting of streets, highways, other public thoroughfares, and publicly-owned and publicly-operated automobile parking lots which are open to the general public, where the customer owns the street lighting equipment. TERRITORY Within the city limits of the City of Vernon. RA TES RATE A-UNMETERED SERVICE: Per Month All Night Service Midnight Service Multiple ~ Multiple ~ For each kW of lamp load, per kW . . . . $19.88 $25.84 $12.09 $14.41 RATE B-METERED SERVICE: Meter Charge: Multiple Service ...... Series Service . . . . . . . . Per Meter Per Month $ 4.64 $12.36 Energy Charge (to be added to Meter Charge): All kWh, per kWh . . . . . 5.598C RATE C-MAINTENANCE SERVICE-OPTIONAL: In addition to the Rate A or Rate B charges. Authorized by the CiQ' of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Effective 06/08/84 Resolution No. 7034 Effective 11/01/97 Schedule LS-2 (cont.) Lamp Rating Lumens Lamp Txpe 1,000. 2,500. 4,000. 6,000. 10,000. 3,500. 7,000. 11,000. 20,000. 35,000. 55,000. 5,800 9,500 16,000 22,000 25,500 47,000 Incandescent Extended Service ............. Incandescent Extended Service ............. Incandescent Extended Service ............. Incandescent Extended Service ............. Incandescent Extended Service ............. Mercury Vapor ....................... Mercury Vapor ....................... Mercury Vapor ....................... Mercury Vapor ....................... Mercury Vapor ....................... Mercury Vapor ....................... High Pressure Sodium Vapor .............. High Pressure Sodium Vapor .............. High Pressure Sodium Vapor .............. High Pressure Sodium Vapor .............. High Pressure Sodium Vapor .............. High Pressure Sodium Vapor .............. SPECIAL CONDITIONS 1. Ownership of Facilities: Per Lamp Per Month $0.34 0.39 0.41 0.43 0.46 0.37 0.34 0.41 0.37 0.56 0.50 0.82 0.82 0.80 .0.81 0.81 0.83 a. For multiple systems the Utility will deliver service at 120, 120/240 volts, or, at the option of the Utility, at 240/280 volts, three-wire, single-phase. For series systems the Utility will furnish and maintain constant current regulating transformers and deliver service at the secondary side of such transformers. b. The customer will furnish and maintain all utilization equipment beyond the point of delivery except for maintenance service provided by the Utility in accordance with Special Condition 3. c. Meter locations for multiple systems shall be at points mutually agreed upon. Meter locations for series systems shall be on the primary supply circuit to the constant current regulating transformer at a point acceptable to the Utility . 2. Lamp Load: The lamp load for regular (general purpose) multiple incandescent lamps shall be the manufacturers I lamp rating in watts. The lamp load in watts for lumen rated street lighting lamps shall be as follows: .Closed to new installation as of November I, 1997. Authorized by the CiQ' of Vernon Ordinance No 940 Resolution No. 5076 Effective 12/06/83 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/0l/97 2 Schedule LS-2 (cont.) HIGH MERCURY PRESSURE INCANDESCENT VAPOR SODIUM PRESSURE MULTIPLE SERIES GROUP GROUP EXTENDED REPLACEMENT EXTENDED LUMENS REGULAR REPLACEMENT ~ REGULAR SVC. svs. MULL ~ Watts Walts Watts Watts Watts Watts Walts Watts Walts 600. 55 58 42 45 800. 57 1,000. 85 92 103 62 65 73 2,500. 175 189 202 143 152 164 3,500. 125 4~000. 268 295 327 210 251 5,800. 220 82 85 6,000. 370 405 448 310 325 364 7,000. 208 9,500 140 121 10,000. 575 620 690 S2S S58 605 11,000. 292 15,000. 800 860 7SS 822 447 16,000 202 174 20,000. 447 22,000 248 233 25,000. 1,275 25,500 320 35,000. 753 47,000 485 55,000. 1,058 Tota11amp load shall be determined to the nearest 1/ lO kW. *Closed to new installation as of November 1, 1997. l Authorized by the CiQ' of Vernon Ordinance No 940 Resolution No. 5076 Effective 12/06/83 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 3 Schedule LS-2 (cont.) 3. Maintenance Service: Maintenance service furnished by the Utility under Rate C for the lamps specified shall include the following: a. Renewal of lamps after the original installation by the customer. b. Regular inspection. c. Periodic cleaning of globes. d. Labor of replacing lamps and globes. Incandescent lamps furnished under this provision will be extended service lamps only. Mercury vapor lamps and high pressure sodium vapor lamps furnished under this provision will be as specified by the Utility. Globes for renewal shall be furnished by the customer. Maintenance service will be furnished only where, in the opinion of the Utility, no undue hazard or expense will result because of location, mounting height, or other reasons. 4. Switching Facilities: For all night or midnight (Pacific Standard Time) service under the Utility's standard operating schedules, the Utility will furnish, maintain, and operate the necessary switching facilities. For other operating schedules, the customer shall furnish, maintain, and operate switching facilities as specified by the Utility and take metered service under Rate B. 5. Hours of Service: Under the Utility's standard all night operating schedule, approximately 4,140 hours of service per year will be furnished and under the Utility's standard midnight (Pacific Standard Time) operating schedule approximately 2,090 hours of service per year will be furnished. 6. Removal of E(pIipOlent: Where street lighting service and facilities were ordered removed by a customer and such service and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal of the prior facilities and the estimated cost of such reinstallation. Utility-owned facilities removed or installed remain the sole property of the Utility. 7. Energy Curtailment Service: Where the customer requests the installation and/or removal of equipment in order to curtail energy requirements, and such request is acceptable to the Utility, the Utility will comply with such request provided the customer first agrees to pay to Utility the estimated cost installed or any additional equipment required and/or the removal cost of any equipment currently installed. Authorized by the CiQ' of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 4 Schedule LS-2 (cont.) Such payments will not be refunded and shall be paid in advance or in installments acceptable to Utility over a period of not to exceed three years. Facilities installed in connection with such requests become and remain the sole property of the Utility . 8. Energy Cost Acljustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. The applicable energy cost adjustment billing factors set forth therein will be applied to the kWh shown below: "(we of Senrice kWh Per kW Per MOl1th All Night Multiple All Night Series Midnight Multiple Midnight Series 355 462 180 233 9. In-Lieu of Tax and Franchise Payments: . The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. Authorized by the CiQ' of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 5 Exhibit "F" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. OL-l OUTDOOR AR}:A LIGHTING SERVICE APPLICABILITY Applicable to outdoor area lighting service, other than street and highway lighting service, supplied from overhead lines where the Utility owns and maintains the area lighting equipment. TERRITORY Within .the city limits of the City of Vernon. RA TES LUMINAIRE CHARGE: Energy Curtailment Service Lamp Size-Lumens All Night Service Per Lamp Per Month Midnight or Equivalent Service Per Lamp Per Month Facilities Charge Per Lamp Per Month High-Pressure Sodium Vapor Lamps 5,800 Lumens 9,500 Lumens 22,000 Lumens $ 7.60 8.57 $11.88 $7.04 $7.57 $9.74 $5.56 $5.72 $6.59 POLE CHARGE (to be added to Luminaire Charge): Per Pole Per Month For each additional new wood pole installed ....... $2.67 Authorized by the CiQ' of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Effective 06/08/84 Resolution No. 7034 Effective 11/01/97 Schedule OL-1 (cont.) SPECIAL CONDITIONS 1. Hours of Service: Area all night lighting service will be furnished from dusk to dawn, approximately 4,140 hours per year, by Utility-owned luminaires supplied from the Utility's existing 120/140 volt overhead circuits and mounted on existing Utility-owned wood poles as standard equipment. 2. Oth~r Than Standard Eqpipm~nt: Where the customer requests the installation of other than the standard equipment furnished by the Utility and such requested equipment is acceptable to the Utility, the Utility will install the requested equipment provided the customer agrees to advance the estimated difference in installation cost installed between such equipment and standard equipment. Advances made for this purpose will not be refunded. Facilities installed in connection with such agreements become and remain the sole property of the Utility. 3. Service and Facilities Furnished: This service will be in accordance with Utility's specifications as to the equipment, installation, maintenance, and operation. 4. Replacement of Lamps: The Utility will replace lamps on a scheduled basis, and individual lamps will be replaced upon service failure, as soon as practical after notification by customer, subject to Utility's operating schedules. 5. Contract: A written contract for a term of one year will be required by the Utility when service is first established under this schedule. 6. T}!pe of Service: This service will be furnished only where the installation is considered by the Utility to be of a permanent and established character. 7. Removal or Modification of Eqpipment: Where area lighting service and facilities were ordered removed or modified by a customer and such service and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the prior facilities and the estimated cost of such reinstallation. Facilities removed or installed remain the sole property of the Utility. Authorized by the CiQ' of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 2 Schedule OL-l (cont.) 8. Energy Cost Aqjustment: The rates above for all-night service are subject to adjustment as provided for in Resolution No. 7032. The applicable energy cost adjustment billing factors set forth therein will be applied to 4 kWh per month per 1,000 lumens for high pressure sodium vapor lamps. 9. Energy Curtailment Service: a. Where the customer requests the installation and/or removal of equipment in order to obtain Energy Curtailment Service, and such request is acceptable to the Utility, the Utility will comply with such request provided the customer first agrees to advance the estimated installation cost of any additional equipment required and/or the removal cost of any equipment currently installed. Such advances will not be refunded. Facilities installed in connection with such requests become and remain the sole property of the Utility. b. Under the Utility's midnight Pacific Standard Time (pST) or equivalent service operating schedule, approximately 2,090 hours of service per year will be furnished. c. Facilities charges shall be applicable under this schedule only when the Utility has been requested to discontinue the existing service by the customer and the customer has stipulated that the facilities are to be left in place for future use. d. The rates above for midnight or equivalent services are subject to adjustment as provided for in Resolution No. 7032. The applicable energy cost adjustment billing factors set forth therein will be applied to 2 kWh per month per 1,000 lumens for high pressure sodium vapor lamps. 10. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. Authorized by the CiQ' of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5976 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11 /Ot /97 3 Exhibit "J" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. PA-l POWER-AGRICULTURAL AND PUMPING CONNECTED WAD BASIS APPLICABILITY Applicable to power service for general agricultural purposes or for general water or sewerage pumping. TERRITORY Within the city limits of the City of Vernon. RATES Horsepower of Connected Load Per Meter Monthly Service Charge Per Meter Per hp 2 and over . . . . . . . . . . . . . . . . . . . . $1. 03 Energy Charge to be added to Service Charge-Rate All kWh, per kWh . . . . . . . . . . . . . . . 7.874C Minimum Charge: The monthly minimum charge shall be the monthly Service Charge. SPECIAL CONDmONS 1. Volta&'e: Service will be supplied at one standard power voltage. 2. Connected Load: Connected load is the sum of the rated capacities of all of the customer's equipment that it is possible to connect to the Utility's lines at the same time, determined to the nearest 1/10 hp. In no case will charges be based on less than 2 hp for single-phase service or no less than 3 hp for three-phase service. The rated capacity of the customer's equipment will be the rated horsepower output of standard rated motors, and the rated kilovolt-ampere input capacity of other Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Effective 06/98/84 Resolution No. 7034 Effective 1l/0l/97 1 Schedule PA-1 (cont.) equipment, with each kilovolt-ampere of input considered equal to one horsepower. Normally such ratings will be based on the manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of the Utility, be based on tests or other reliable information. 3. Overloaded Motors: Whenever, upon test, any motor under normal operating conditions is found to be delivering more than 115 percent of its capacity as indicated by its nameplate rating, the Utility may disregard the nameplate rating and base its charges upon the output as calculated from test. Any motor which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be rested at intervals to be determined by the Utility or upon notification by the customer of a permanent change in operating conditions. 4. Temporary Reduction of Connected Load: Where the use of energy is seasonable or intermittent, no adjustment will be made for any temporary reduction of connected load. Any customer, prior to resuming service on such connected load within 12 months after it was disconnected, will be required to pay all charges which would have been billed if the temporary reduction of connected load had not been made. 5. Energy Cost Acljustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 6. In-Lieu Tax aod Fnutchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. Authorized by the City of Vernon Ordinance No. ~4O Effective 12/06/83 Resolution No. 5076 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 2 E}thibit "K" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. PA~2 POWER-AGRICULTURAL AND PUMPING DEMAND BASIS APPLICABILITY Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is subject to meter availability. TERRITORY Within the city limits of the City of Vernon. RA TES Per Meter Per Month Demand Charge: First 75 kW or less of billing demand . . . . . . . . . . . . . . All excess kW of billing demand, per kW . . . . . . . . . . . $540.75 $ 7.21 Energy Charges (to be added to Demand Charge): All kWh per kWh .......................... 5.524C Minimum Charge: The monthly minimum charge shall be the monthly Demand Charge. SPECIAL CONDITIONS 1. Voltage: Service will be supplied at one standard voltage. 2. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 50 % of the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 75 kW. Billing demand shall be determined to the nearest kW. Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 5076 Effective 12/06/83 Effective 06/08/84 Resolution No. 5tll Resolution No. 7034 Effective 06/08/84 Effective 1l/0l/97 1 . Schedule PA-2 (cont.) 3. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month. Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. 4. Power}"actor Acljustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 5. Tempom:y Discontinuance of Service: Where the use of energy seasonable for intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. 6. Energy Cost Acljustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 7. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. 8. Excess Transformer C~acity: The transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kV A per month. Authorized by the ~i~ of 'Vernon Ordinance No. 940 Resolution No. 5076 Effective 12/06/83 Effective 06/08/84 Resolution No. 5111 Resolution No. 7034 Effective 06/08/84 Effective 11/01 /97 2 Schedule PA-2 (cont.) . 9. Contract Demand: A contract demand will be established by the Utility, based on applicant's demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts. 10. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 5076 Effective 12/06/83 Effective 06/08/84 Resolution No. 51ll Resolution No. 7034 Effective 06/08/84 Effective 11/01/97 3 Exhibit "P" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. PA-TOU POWER-AGRICULTURAL AND PUMPING TIME-OF-USE APPLICABILITY Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is elective for customers with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but are less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is subject to meter availability. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Customer Charge .10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $159.50 Demand Charge (to be added to Customer Charge): All kW of on-peak maximum billing demand, per kW Plus all kW of mid-peak maximum billing demand, per kW . Plus all kW of off-peak billing demand, per kW ........ $ 10.635 $ 1.650 No Charge* Energy Charge (to be added to Demand Charge): All on-peak kWh, per kWh . . . . . . . . . . . . . . . . . . . . . . Plus all mid-peak kWh, per kWh . . . . . . . . . . . . . . . . . . Plus all off-peak kWh, per kWh . . . . . . . . . . . . . . . . . . . 3.334C 3.009C 2.507C *(Subject to Minimum Demand Charge. See Special Condition No. 11.) Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 7034 Resolution No. Effective 12/06/83 Effective 11/01/97 Effective 1 Schedule PA-TOU (coot.) &JlECIAL CONDITIONS 1. Time Period: Time Periods are defined as follows: On-Peak: 1:00 p.m. to 7:00 p.m. Summer Weekdays except holidays 5:00 p.m. to 10:00 p.m. Winter weekdays except holidays Mid-Peak 9:00 a.m. to 1:00 p.m. and 7:00 p.m. to 11:00 p.m. Summer weekdays except holidays 8:00 a.m. to 5:00 p.m. Winter weekdays except holidays Off-Peak: All other hours: Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday. The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. 2. Voltage: Service will be supplied at one standard voltage. 3. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 25 % of the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 50 kW. Billing demand shall be determined to the nearest kW. Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 7034 Resolution No. Effective 12/06/83 Effective 1l/01l97 Effective 2 Schedule PA-TOU (cont.) 4. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month. Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. 5. Power Factor Acijustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 6. TempoI'aQ' ~iscontinuance of Service: Where the use of energy seasonable for intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. 7. Energy Cost Adjustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 8. In-~jeu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. 9. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kV A per month. Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 7034 Resolution No. Effective 12/06/83 Effective 11/01/97 Effective 3 Schedule PA-TOU (cont.) 10. Contract D~mand: A contract.demand will be established by the Utility, based on applicant's demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts. 11. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. Authorized by the City of Vernon Ordinance No. 940 Resolution No. 7034 Resolution No. Effective 12/06/83 Effective 11 /01197 Effective 4 Exhibit "G" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. TC-l TRAFFIC CONTROL SERVICE APPLICABILITY Applicable to single-phase service for traffic-directional signs or traffic-signal systems located on streets, highways and other public thoroughfares and to railway crossing and track signals. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Customer Charge: $4.89 Energy Charge (to be added to Customer Charge): All kWh, per kWh . . . . . . . . . . . . . . . . . . . . . . . 6.885C Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge. SPECIAL CONDITIONS 1. Vol~e: Service will be supplied at one standard voltage not in excess of 240 volts or, at the option of the Utility, at 240/480 volts, three-wire, single-phase. 2. Energy Cost A<ljustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 3. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 5076 Effective 06/0&/84 Resolution No. 5111 Effective 06/08/84 Resolution No. 7034 Effective 11/01/97 1 Exhibit "M" CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. TOU-G GENERAL SERVICE-LARGE APPLICABILITY Applicable to single- and three-phase general service including lighting and power. Service under this schedule is elective for customers served under Schedule No. GS-2 with a monthly maximum demand that exceeds 200 kW for three months during the preceding twelve months but are less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is elective for all existing customers with time of use metering who have been taking service under Schedule TOU-V with a monthly maximum demand that exceeds 200 kW for three months during the preceding twelve months but are less than 500 kW for any nine months during the preceding l2 months. Service under this schedule is subject to meter availability. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month CustomerCharge ................................. $159.50 Demand Charge (to be added to Customer Charge): All kW' of on-peak maximum billing demand, per kW . . . . . . Plus all kW of mid-peak maximum billing demand, per kW .. Plus all kW of off-peak billing demand, per kW ......... Energy Charge (to be added to Demand Charge): All on-peak kWh, per kWh . . . . . . . . . . . . . . . . . . . . . . . Plus all mid-peak kWh, per kWh ................... Plus all off-peak kWh, per kWh . . . . . . . . . . . . . . . . . . . . $ 10.635 $ 1. 650 No Charge* 3.344C 3.009C 2.507C *(Subject to Minimum Demand Charge. See Special Condition No. 10.) Authorize4 by the qQ' of Vernon Ordinance No. 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 11/01/97 1 Schedule TOU-G (cont.) SPECIAL CONqlTJONS 1. Time Period: Time Periods are defined as follows: On-Peak: 1:00 p.m. to 7:00 p.m. Summer Weekdays except holidays 5:00 p.m. to 10:00 p.m. Winter weekdays except holidays Mid-Peak: 9:00 a.m. to 1:00 p.m. and 7:00 p.m. to 11:00 p.m. Summer weekdays except holidays 8:00 a.m. to 5:00 p.m. Winter weekdays except holidays Off-Peak: All other hours: Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday. The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. 2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW. Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 11/01/97 2 Schedule TOU-G (cont.) 3. Maximum Demand: The maximum demands shall be established for the on-peak, mid-peak, and off-peak periods. The maximum demand for each period shall be the measured maximum. average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. 4. Voltage Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; by 4 % for service delivered and metered at voltages of from 11 kV through 50 kV; and by 5% for service delivered and metered at voltages over 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3% discount will be entitled to a 4% discount. 5. Power Factor Acljustment: a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each month for the power factor as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A rachet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. Authorized by the C.Q' of Vernon Ordinance No. 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/0 l/90 Effective 1110l/97 3 Schedule TOU-O (cont.) 6. Temporat:}' Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. 7. Enet:iy Cost Acijqstment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 8. Excess Transformer Capacity: A transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 kV A per month. 9. Contract Demand:. A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts. 10. Minimum Demand Charge: Where a non-time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. 11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. 12. Contracts: An additional three-year facilities contract may be required where applicant requires new or added serving capacity exceeding 2,000 kV A. 13. . 'Yoltage: Service will supplied at one standard voltage. Authorized by the CiQ' of Vernon Ordinance No. 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 11/01/97 4 Exhibit "e" . CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. TOU-V GENERAL SERVICE-LARGE APPLICABILITY This schedule is applicable for all customers with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use meters have been installed. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Summer Winter Customer Charge ................................ $159.50 $159.50 Demand Charge (to be added to Customer Charge): All kW of on-peak maximum billing demand, per kW Plus all kW of mid-peak maximum billing demand, per kW . Plus all kW of off-peak billing demand, per kW ........ $ 10.295 $ 8.545 $ 1.597 $ 1.597 No Charge No Charge* Energy Charge (to be added to Demand Charge): All on-peak kWh, per kWh . . . . . . . . . . . . . . . . . . . . . . Plus all mid-peak kWh, per kWh . . . . . . . . . . . . . . . . . . Plus all off-peak kWh, per kWh . . . . . . . . . . . . . . . . . . . 3.186C 2.861C 2.374C 3.186C 2.861C 2.374C *(Subject to Minimum Demand Charge. See Special Condition No. 10.) Authorized by the CiQ' 9fVernon Ordinance No. 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 11/01/97 1 Schedule TOU-V (cont.) SPECIAL CONDITIONS 1. Time Period: Time Periods are defined as follows: On-Peak 1:00 p.m. to 7:00 p.m. Summer weekdays except holidays 5:00 p.m. to 10:00 p.m. Winter weekdays except holidays Mid-Peak: 9:00 a.m. to 1:00 p.m. and 7:00 p.m. to 11:00 p.m. Summer weekdays except holidays 8:00 a.m. to 5:00 p.m. Winter weekdays except holidays Off-Peak: All other hours: Off-Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday. The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. 2. Billing Demand: Separate billing demands for the on-peak, mid-peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW. Authorized by the Ci\V of Vernon Ordinance No. 940 Resolution No. 5076 Resolution No. SIll Effective t 2/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 1 t/0l/97 2 .. Schedule TOU-V (cont.) ~ 3. MaximJIm Demand: The maximum demands shall be established for the on-peak, mid-peak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. 4. Volb\&e Discount: The charges including adjustment will be reduced by 3% for service delivered and metered at voltages of from 2 kV through 10 kV; by 4 % for service delivered and metered at voltages of from 11 kV through 50 kV; and by 5 % for service delivered and metered at voltages over 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled. to a 3 % discount will be entitled to a 4 % discount. 5. Power Factor Acljustment: a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at ~ss than 4 kV: The charges will be adjusted each month for the power factor as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. Authorized by the City of Vernon Ordinance No. 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective 07/01/90 Effective 11/01/97 3 ~ Schedule TOU-V (cont.) ~ ~. J ~ 6. Tell\POrat:Y Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. 7. Energy Cost Acljustment: The rates above are subject to adjustment as provided for in Resolution No. 7032. 8. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kV A per month. 9. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt-ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less.and is expressed in kilowatts. 10. Minimum Demand Charge: Where a non-time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. 11. In-Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in-lieu of tax and franchise payments. 12. Contracts: An additional three-year facilities contract may be required where applicant requires new or added serving capacity exceeding 2,000 kV A. 13. Voltage: Service will be supplied at one standard voltage. Authorized bv the City of Vernon Ordinance No. 940 Resolution No. 5076 Resolution No. 5111 Effective 12/06/83 Effective 06/08/84 Effective 06/08/84 Resolution No. 5760 Resolution No. 7034 Effective. 07/01/90 Effective 11/01/97 4