Resolution No. 7640T t 1 RESOLUTION NO. 7640 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 VERNON APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT NO. ONE TO THE EQUIPMENT PURCHASE CONTRACT 4 BY AND BETWEEN THE CITY OF VERNON AND BEYLIK DRILLING, INC. 5 6 WHEREAS, pursuant to Resolution No. 7586 adopted by the City 7 Council of the City of Vernon on July 26, 2000, the City Clerk was 8 directed to give notice inviting sealed proposals or bids for the 9 replacement and reinstallation of pumping equipment at Well No. 17 in 10 accordance with a Bid Proposal (Bid No. 1397); and 11 WHEREAS, the Bid Proposal was approved by the City Council of 12 the City of Vernon pursuant to Resolution No. 7586, and sealed bids 13 were opened on August 28, 2000; and 14 WHEREAS, the Bid Proposal provided for stainless steel 15 shafting rather than C-1045 carbon steel which is the industry 16 standard for oil lubricated deep well pumps like Well No. 17; and 17 WHEREAS, Beylik Drilling, Inc. ("Beylik") submitted a bid 18 which provided for stainless steel shafting as well as a bid rider 19 dated August 26, 2000, indicating that if C-1045 carbon steel was 20 acceptable that the sum of Nine Thousand One Hundred Thirty Dollars 21 and No Cents ($9,130.00) could be deducted from its bid; and 22 WHEREAS, the City Council of the City of Vernon determined 23 that Beylik was the lowest responsible bidder meeting the requirements 24 of Bid No. 1397 and adopted Resolution No. 7612 on September 5, 2000, 25 approving the execution of an Equipment Purchase Contract 26 ("Contract"); and 27 WHEREAS, the City of Vernon entered into the Contract dated 28 ti 1 1 September 18, 2000, with Beylik for the replacement and reinstallation 2 of the pumping equipment at Well No. 17 at 4355 Downey Road in Vernon; 3 and 4 WHEREAS, the Department of Community Services & Water has 5 determined that if C-1045 carbon steel is used instead of stainless 6 steel, it would lower the cost to the City under the Contract and be 7 more cost effective; and 8 WHEREAS, by notice dated September 26, 2000, Beylik advised 9 the City of .Vernon that Well No. 17 needed to be brushed and bailed 10 because perforations were moderately plugged and that Beylik could 11 perform such additional work for the sum of Seven Thousand Two Hundred 12 Dollars and No Cents ($7,200.00); and 13 WHEREAS, the Department of Community Services & Water has 14 advised that such additional work is required and because Beylik is 15 already performing work on Well No. 17, it would be more cost 16 effective and efficient to have Beylik perform the additional work; 17 and 18 WHEREAS, Beylik and the City of Vernon desire to amend the 19 Contract to allow Beylik to utilize C-1045 carbon based line shafts 20 instead of stainless steel line shafts and lower the price to be paid 21 to Beylik under the Contract by Nine Thousand One Hundred Thirty 22 Dollars and No Cents ($9,130.00); and 23 WHEREAS, pursuant to Section 2.27 of the Vernon City Code, 24 the City of Vernon and Beylik also desire to amend the Contract to 25 provide for the additional work of cleaning of Well No. 17. 26 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE 27 CITY OF VERNON AS FOLLOWS: 28 SECTION 1• The City Council of the City of Vernon hereby - 2 - 1 2 71 Ell 9 10 11 12 13 14 15 16 17 18' 19 20 21 22 23 24 25 26 27 28 finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon hereby approves the Amendment No. One to the Equipment Purchase Contract, a copy of which is attached hereto as Exhibit "A" and made a part hereof. SECTION 3: The City Council of the City of Vernon hereby authorizes the Mayor and the City Clerk to execute said Amendment No. One for, and on behalf of, the City of Vernon. SECTION 4: The City Council of the City of Vernon hereby directs the City Clerk, or his designee, to send one fully executed Amendment No. One to: Beylik Drilling, Inc. Attn: Larry Gomez 555 S. Harbor Blvd. La Habra, CA 90631 SECTION 5: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 3rd day of October, 2000. ATTEST• 74)—� /�' �-Z -- BRUCE V. MALKENHORST, City Clerk " I LEONIS C. MAhBURG,Y Mayor - 3 - 1 2! 3' 4 5 6 7 8 9 10 11 12 13 14 15 16 17I 18' 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 7640, was duly adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Tuesday, October 3, 2000, and thereafter was duly signed by the Mayor of the City of Vernon. (SEAL) BRUCE V. MALKENHORST, city ClerK - 4 EXHIBIT 0 t A i 1 AMENDMENT NO. ONE TO THE EQUIPMENT PURCHASE CONTRACT 2 3 THIS AMENDMENT NO. ONE TO THE EQUIPMENT PURCHASE CONTRACT 4 (the "Amendment") is made, entered into and executed in duplicate 5 originals, either copy of which may be considered and used as the 6 original hereof for all purposes, as of this day of October, 7 2000. 8 BY AND BETWEEN THE CITY OF VERNON, a municipal 9 corporation (hereinafter referred to as the "City") 10 4305 Santa Fe Avenue Vernon, California 90058 11 12 AND Beylik Drilling, Inc. (hereinafter referred to as 13 "Beylik") 14 555 S. Harbor Blvd. La Habra, CA 90631 15 16 17 RECITALS 181 WHEREAS, City and Beylik are parties to an Equipment 19 purchase Contract dated September 18, 2000 (hereinafter referred to as 20 the "Contract") with respect to the replacement and reinstallation of 21 the pumping equipment at Well No. 17 at 4355 Downey Road in Vernon for 22 the total sum of Fifty -Five Thousand Nine Hundred Eighty -Seven Dollars 23 and No Cents ($55,987.00); and 24 WHEREAS, pursuant to the Contract, Beylik was to replace line shaft bearings, line shaft enclosing tubes with couplings, and 25 stainless steel line shafts (20, sections) - assemble and wrap ends to 26 approximately 440- feet for a cost of Twenty Thousand Nine Hundred 27 Dollars and No Cents ($20,900.00); and 28 I WHEREAS, the staff of the Department of Community Services & 2 Water has determined that carbon based line shafts are commonly used 3 on oil lubricated pump applications because the risk of any corrosion 4 occurring is remote, while water lubricated pumps require stainless 5 steel line shafts to avoid the effect of corrosion normally associated with the use of carbon based shafts; and 7 WHEREAS, the pump unit at Well No. 17 is oil lubricated and, 8 therefore, the use of C-1045 carbon based line shafts is the preferred 9 construction material; and 10. WHEREAS, the cost of using C-1045 carbon based line shafts 11 is approximately Eleven Thousand Seven Hundred Seventy Dollars and No 12 Cents ($11,770.00), approximately Nine Thousand One Hundred Thirty 13 Dollars and No Cents ($9,130.00) less than the previous bid amount; 14 and 151 WHEREAS, the staff of the Department of Community Services & 161 Water have reviewed a video log of Well No. 17 and discovered that 17 perforations along the entire length of the casing are moderately 18 plugged with nodular growth which should be removed in order to extend 19 the useful life and productivity of the well; and 20 WHEREAS, Beylik has proposed that Well No. 17 be brushed and 21 bailed to alleviate the growth at an approximate cost of Seven 22 Thousand Two Hundred Dollars and No Cents ($7,200.00); and 23 WHEREAS, the incorporation of the two changes into Beylik's 24 original bid will lower the original bid amount by approximately One 25 Thousand Nine Hundred Thirty Dollars and No Cents ($1,930.00) and the 26 new bid amount would be approximately Fifty -Four Thousand Fifty -Seven 27 Dollars and No Cents ($54,057.00); and 28 WHEREAS, the staff of the Department of Community Services & - 2 - I Water recommend the incorporation of the two changes to the bid 2 specifications for the repair of the pump unit at Well No. 17 in order 3 to extend the useful life and productivity of the well; and 4 WHEREAS, the City and Beylik desire to amend the Contract to 5 change the scope of the work to incorporate the aforementioned 6 changes. 7 NOW, THEREFORE, IN CONSIDERATION OF THESE MUTUAL COVENANTS, 8 THE PARTIES HERETO AGREE AS FOLLOWS: 9 SECTION 1: Paragraph 1 of the Contract entitled "Purchase," 10 is hereby amended to read as follows: 11 1. Purchase. Beylik agrees to furnish parts and 12 labor to replace and reinstall the pumping equipment at Well 13 No. 17 located at 4355 Downey Road in Vernon according to 14 the specifications contained in the City's Bid documents 15 dated August 10, 2000, and Beylik's Bid of August 11, 2000 16 (the "Bid Documents"). A copy of the'Bid Documents are 17 attached hereto as Exhibit "A" and incorporated herein by 18 reference. It is further understood and agreed that the 19 change proposed in Beylik's letter of August 26, 2000, 20 attached hereto as Exhibit "C" and made a part hereof, will 21 provide the City with C-1045 carbon steel shafting instead 22 of stainless steel shafting and the change proposed in 23 Beylik's letter of September 26, 2000, attached hereto as 24 Exhibit "D" and made a part hereof, provides for the 25 necessary cleaning of the perforations along the entire 26 length of the casing. 27 28 / / / SECTION 2: Paragraph 2 Of the Contract entitled "Price," is hereby amended to read as follows: 2. Price. Consistent with its.Bid, Beylik agrees to provide parts and labor for the replacement, and reinstallation of pumping equipment at Well No. 17 and the cleaning of perforations along the entire length of the casing for the total sum of Fifty -Four Thousand Fifty -Seven Dollars and No Cents ($54,057.00), tax included. SECTION 3: Paragraph 3 of the Contract entitled ".Payment Terms," is hereby amended to read as follows: 3. Payment Terms. The City agrees to pay Beylik a total of Fifty -Four Thousand Fifty -Seven Dollars and No Cents ($54,057.00), tax included, for parts and labor' associated with the replacement and reinstallation of the pumping equipment at Well No. 17 pursuant to an invoice provided by Beylik. SECTION 4: In all other respects, the terms and conditions of the contract shall be renewed in its entirety. - 4 - 1 2 3 4 5 6, 7 8 9 10 11 12 13 14, 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, City and Beylik have executed this Amendment as of the date first hereinabove set forth. CITY OF VERNON By: LEONIS C. MALBURG, Mayor ATTEST: BRUCE V. MALKENHORST, City Clerk APPROVED AS TO FORM: EDUARDO OLIVO, City Attorney YLI R LING,. I By: Douglos L. Watson Title: Vice President By: William R. Godwin Title: Vice President - 5 - EXHIBIT o,t vVvL.j ,ALLIED BUSINESS FORMS. INC. ' (818)'960-3802 REDIDallLING AUGREQUEST FORQU TCITY OF VERNON, CALIFORNIA NOT A PURCHASE ER PURCHASING DEPARTMENT DIRECT ALL INQUIRIES TO. CITY HALL CITY PURCHASING AGENT TELEPHONE(213) W-8811 4305 Santa Fe Ave. — Vernon, California 90058 TO Larr Gomez c/o BEYLIK DRILLING, INC., La Habra, CA 90631 FOR CITY USE ONLY r� QUOTATION NO. 1397 8/10/00, DATE MAILED REC'D BY CI OPE BY ay cified te on each item tely Please quote hdreon the lowest net a stating so on body ohf farticles orC City reservesservicesthee right tobaccept(oro eject quotationsreceivedonBany eorna qualify quotations as all or none by 9 items. In order to maintain their name on City's Bidder File, Vendor should return this form whether a price is quoted or not. TOTAL NET UNIT PRIDE QUANTITY DESCRIPTION Replace and reinstall pump equipment, including the pump, column pipe, shaft, tubing and strainer at Well No. 17 located at 4355 Downey Road in Vernon, as per attached specification sheets. Please include total cost of the bid plus applicable sales tax on both forms. PLEASE NOTE: Please mark bid number 1397 on the outside of the envelope, otherwise bid will not be accepted. IF INSUFFICIENT SPACE PROVIDED ABOVE FOR PAYSROPOSAL, ATTACH RIDER OR SUPPLEMENT. CASH DISCOUNTS RECEIVED 0 O itES PERIODS TOO 1 SS REQUEST FOR QUOTATION WILL BEWILL NOT BE DOpNEO yi CITY URCHASINGWHEN ORDER IS DACaENTS ___J AT b OFFICE ON THE i th _ DAY OF . NOT Et Quote prices exclusive of Sales Tax and.Excis* T��a��xes..�� B. Indicate Excise Tax in this space $ ...-•••-•-•'•"'""'..._. ...... A. Indicate Sales Tax in this space $..... ................... .......... �, F.O.B. .............................. C. Above quotations subject to Cosh Discount of.... F+� ... ' D. To be delivered to CITY OF VERNON at ............................ ........... h - .. da s*from receipt of purchase order gt rit*s specified eif�ed Wr.(I) Gyre* to fumish Gbeve in ....................... ........... .». ... FOR... ...k'... '•••,•r.J' Firm e A COUNCIL LEONIS C. MALBURG Mayor THOMAS A. YBARRA Mayor Pro-Tem Wm. 'BILL" DAVIS Councilman H. "LARRY" GONZALES Councilman W. MICHAEL McCORMICK Councilman DAVID B. BREARLEY City Attorney FAX: (626) 330-5818 KEVIN WILSON Director of Community Services do Water FAX: (323) 588-2761 KENNETH J. DeDARIO Director of Municipal Utilities FAX: (323) 583-1983 DAVE TELFORD Fire Chief FAX: (323) 581-1385 BRUCE V. MALKENHORST CITY HALL BRUCE W. OLSON City Administrator / City Clerk 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 Police Chief FAX (323) 581-7924 TELEPHONE (323) 583-8811 FAX: (323) 583-5236 June 20, 2000 BID SPECIFICATIONS WELL 17'REPAIR (BID No. 1397) The City of Vernon is requesting quotations for the replacementand reinstallation of the pump equipment, including the pump, column pipe, shaft, tubing, and strainer at Well No. 17 located at 4355 Downey Road in Vernon. The City requests that the contractor provide firm estimates on the items listed below. If there are other items that you feel will be necessary to ensure the proper operation of the well, please include these items on a separate sheet. In addition, each bid shall include specifications of types of parts to be used as replacement parts. Wherever possible, replacement parts shall made by the same manufacturer as the original equipment. The City of Vernon requires that the contractor who is awarded this work provide a one year warranty on all work performed during the project. Any pump failures that result from leaks in the shaft tubing, premature bearing failure, or other causes related to the work performed by the contractor shall be repaired at no cost to the City. A written statement of warranty must accompany your bid sheets. Attached you will find Bid Specifications and Request for Quotation forms. The submittal of any incomplete forms will automatically disqualify the bidder from the bid process. All bids must be received in a sealed envelope and returned to the City of Vernon Finance Department no later than 2:00 p.m. XX. The Bid No.1397 must also be clearly indicated on the sealed envelope. E. I Waterl Well 17WQ well 17Pump. dvc Before the contract is awarded, the City of Vernon requires the contractor to provide proof of insurance, including a standard certificate of insurance, in at least the amounts and coverage indicated on the insurance schedule. In addition to the standard certificate of insurance, proof of general and umbrella liability coverage shall also be furnished in the form indicated on the attached insurance schedule. BID ITEMS: ITEM 1: Replace line shaft bearings, line shaft enclosing tubes with couplings, and stainless steel line shafts .(20' sections) — assemble and wrap ends to approximately 440- feet. 'ti cost: ';w , gL00• ITEM 2: Replace bowl assembly — Furnish and install new 14" bowl assembly to yield 1550 GPM at 360 TDH at 1200 RPM. Bowl bearings to be combo bronze and rubber type to help prevent sand intrusion. Cost: ji rW0� ITEM 3: Replace column pipe — Furnish and install 22 sections of 12-inch column pipe, approximately 440 feet. Note these are to be 20;foot pipe sections. Cost: ITEM 4: Replace suction assembly — Furnish and install 10-inch x 10-foot long suction assembly with galvanized cone strainer. co Cost: ITEM 5: Installation — Transport and install pump equipment in well, install and wire motor, stretch shaft, set rotation and test well operation. cost: „ „ _, a ITEM 6: Sounding tube — Furnish and install 440-feet of 1-inch PVC schedule 40 sounding tube for water level measurement. Tubing shall be strapped to column pipe during pump installation and come up through the base of the discharge head. Cost: l `"l 0. ITEM 7: Disinfect well Inject chlorine solution into well casing and hold residual in all parts of well above 250 ppm for a minimum of 48 hours; neutralize chlorine prior to discharge drain oy cost: _j �_D(�__ F. iWater1Well 17UM Well 17 Pump.doc 2 ITEM 8: Repair top tube assembly including new top tube. Cost: ITEM 9: ITEM 10: ITEM 11: Replace top 2' section of 12" column pipe. 0-1 Cost: q 60 Replace 12" x 3 %s" tube stabilizers - Quantity 8 Cost: 0 ' ar � � Bail approximately 100-feet of fill and sediment from well bottom. All materials bailed from well shall be removed from well site and properly disposed of. Cost: d ITEM 12: Please include applicable taxes. Cost:-tPCt(A060 oa TOTAL COST: S �� Note: The total cost must also be included on the Request for Quotation Forms. Submitted by:Lam- Address: VE6 WA �a� ch oc�3i Signature: If a bidder wishes to propose additional repair alternatives, the City of Vernon is open to any suggestions so long as the repair alternative can be included in a revised Request for proposal that will be open to all bidders. E.IWaterlWell 171RFQ Well 17 Pump. doc 3 EXHIBIT BEYLIK DRILLIRG INC. 003 REYLIK DRILL.,ING, INC. 555 S. Harbor Blvd. • La Habra • California 90631 • (714) 870-5360 • (562) 691-0903 • FAX (562) 690-9192 WATER WELL DRILLING MONITORING WELLS WELL AND'PUMP REPAIR TEST HOLES CITY OF VERNON 4305 SANTA FE AVE. VERNON, CA. 90058 August 26,2000 Attention: Mr. Scott Rigg _ Gentlemen In regards to your request for repairs to your Well q 17, we would advise you of the followiAg. Feylik Drilling's quote is based upon using the requested 2-3/16" 416 Stainless Steel shafting. If C-1045 carbon steel is acceptable you inay deduct a total of $9,130.00 from our quote for a new total of $46,857.00. Please note the C-1045 carbon steel is a industry .nandard for oil lubricated deep well pumps. Should you have any questions please feel free to contact our offices. S' ely Yours L . Gomez STATE OF CALIFORNIA CONTRACTOR'S NO. -306291-C-57- & SC-61 EXHIBIT • F, s , 62 690 9192 BEYLIK DRILLING INC. 4 BEYLIK DRILLING, INC. 555 S. Harbor Blvd. • La Habra - California 90631 • (714) 870-5360 - (562) 691-0903 - FAX (562) 690-9192 HOLES WATER WELL DRILLING - MONITORING WELLS • ' WELL AND PUMP REPAIR • TEST FAX TRANSMITTAL TO�� COMPANY (�,CT%f of FAX # rr nn 'lease deliver these pages to the inndividual named above. `you have difficulty receiving this transmission, or if any pages are missing, please call ;62-691-0903 or 714- 870-5360 and speak to: - MESSAGEICOMMENTS l�-� Gi 1 / A-C-V•.R-Nelwln p6mca - wS. �iP t'� �- fi*016 Wm. Ppuca Lua-40 MAJ %u ME bites AA Z.O k LS t3hul 14 hoe" C7 v STATE OF CAUFORNIA CONTRACTOR'S NO. 306291-C-57- & SC-61 & A. 700-Y SUPPORTING DOCUMENTS AMENDMENT NO. ONE TO THE EQUIPMENT PURCHASE CONTRACT THIS AMENDMENT NO. ONE TO THE EQUIPMENT PURCHASE CONTRACT (the "Amendment") is made, entered into and executed in duplicate originals, either copy of which may be considered and ,psed as the ,. original hereof for all purposes, as of this J day of October, 2000. BY AND BETWEEN THE CITY OF VERNON, a municipal corporation (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, California 90058 AND Beylik Drilling, Inc. (hereinafter referred to as "Beylik") 555 S. Harbor Blvd. La Habra, CA 90631 ` RECITALS WHEREAS, City and Beylik are parties to an Equipment Purchase Contract dated September 18, 2000 (hereinafter referred to as the "Contract") with respect to the replacement and reinstallation of the pumping equipment at Well No. 17 at 4355 Downey Road in Vernon for the total sum of Fifty -Five Thousand Nine Hundred Eighty -Seven Dollars and No Cents ($55,987.00); and WHEREAS, pursuant to the Contract, Beylik was to replace line shaft bearings, line shaft enclosing tubes with couplings, and stainless steel line shafts (20' sections) - assemble and wrap ends to approximately 440- feet for a cost of Twenty Thousand Nine Hundred Dollars and No Cents ($20,900.00); and I WHEREAS, the staff of the Department of Community Services & 2 Water has determined that carbon based line shafts are commonly used 3 on oil lubricated pump applications because the risk of any corrosion 4 occurring is remote, while water lubricated pumps require stainless 5 steel line shafts to avoid the effect of corrosion normally associated 6 with the use of carbon based shafts; and 71 WHEREAS, the pump unit at Well No. 17 is oil lubricated and, 8 therefore, the use of C-1045 carbon based line shafts is the preferred 91 construction material; and. 10 WHEREAS, the cost of using C-1045 carbon based line shafts 11 is approximately Eleven Thousand Seven Hundred Seventy Dollars and No 12 Cents ($11,770.00), approximately Nine Thousand One Hundred Thirty 13 Dollars and No Cents ($9,130.00) less than the previous bid amount; 14 and 15 WHEREAS, the staff of the Department of Community Services & 16 Water have reviewed a video log of Well No. 17 and discovered that 17 perforations along the entire length of the casing are moderately 18 plugged with nodular growth which should be removed in order to extend 19 the useful life and productivity of the well; and 20 WHEREAS, Beylik.has proposed that Well No. 17 be brushed and 21 bailed to alleviate the growth at an approximate cost of Seven 221 Thousand Two Hundred Dollars and No Cents ($7,200.00); and 23 WHEREAS, the incorporation of the two changes into Beylik`s 24 original bid will lower the original bid amount by approximately One 25 Thousand Nine Hundred Thirty Dollars and No Cents ($1,930.00) and the 26 new bid amount would be approximately Fifty -Four Thousand Fifty -Seven 27 Dollars and No Cents ($54,057.00); and 28 WHEREAS, the staff of the Department of Community Services & - 2 - I Water recommend the incorporation of the two changes to the bid 2 specifications for the repair of the pump unit at Well No. 17 in order 3 to extend the useful life and productivity of the well; and 4 WHEREAS, the City and Beylik desire to amend the Contract to 5 change the scope of the work to incorporate the aforementioned 6 changes. 7 NOW, THEREFORE, IN CONSIDERATION OF THESE MUTUAL COVENANTS, 8 THE PARTIES HERETO AGREE AS FOLLOWS: 9 SECTION 1: Paragraph 1 of the Contract entitled "Purchase, 10 is hereby amended to read as follows: 11 1. Purchase. Beylik agrees to furnish parts and 12 labor to replace and reinstall the pumping equipment at Well 13 No. 17 located at 4355 Downey Road in Vernon according to 14 the specifications contained in the City's Bid documents 15 dated August 10, 2000, and Beylik's Bid of August 11, 2000 16 (the "Bid Documents"). A copy of the Bid Documents are 17 attached hereto as Exhibit "A" and incorporated herein by 18 reference. It is further understood and agreed that the 19 change proposed in Beylik's letter of August 26, 2000, 20 attached hereto as Exhibit "C" and made a part hereof, will 21 provide the City with C-1045 carbon steel shafting instead 22 of stainless steel shafting and the change proposed in 23 Beylik's letter of September 26, 2000, attached hereto as 241 Exhibit "D" and made a part hereof, provides for the 25 necessary cleaning of the perforations along the entire 26 length of the casing. 27 28 / / / SECTION 2: Paragraph 2 of the Contract entitled "Price," is hereby amended to read as follows: 2. Price. Consistent with its Bid, Beylik agrees to provide parts and labor for the replacement, and reinstallation of pumping equipment at Well No. 17 and the cleaning of perforations along the entire length of the casing for the total sum of Fifty -Four Thousand Fifty -Seven Dollars and No Cents ($54,057.00), tax included. SECTION 3: Paragraph 3 of the Contract entitled "Payment Terms," is hereby amended to read as follows: 3. Payment Terms. The City agrees to pay Beylik a total of Fifty -Four Thousand Fifty -Seven Dollars and No Cents ($54,057.00), tax included, for parts and labor associated with the replacement and reinstallation of the pumping equipment at Well No. 17 pursuant to an invoice provided by Beylik. SECTION 4: In all other respects, the terms and conditions of the contract shall be renewed in its entirety. - 4 - IN WITNESS WHEREOF, City and Beylik have executed this Amendment as of the date first hereinabove set forth. ATTEST: B UCE V. MALKENHORST, City Clerk APPROVED AS TO FORM• AA^CC'& ck,, EDUARDO OLIVO, City Attorney CITY OF VERNON Byc EONIS C. M4BURG, Kayor BEYL ILLI G INC. By: Dougl s L. Watson Title: Virg Prenidanffi--i - 5 - EXHIBIT v V V ALLIED BUSINESS FORMS, INC. • (818),980-3802 s" R:ECEIVED 1 1 2000REQUEST FOR QU T DRILLINGING. CITY OF VERNON, CALIFORNIA NOT A PURCHASE ER PURCHASING DEPARTMENT DIRECT ALL INQUIRIES TO. CITY HALL CITY PURCHASING AGENT TELEPHONE (213).583-8811 4305 Santa Fe Ave. — Vernon, California 900S8 TO Larr Gomez c/o BEYLIK DRILLING, INC., La Habra, CA 90631 FOR CITY USE ONLY QUOTATION NO. 1397 8/10/00, DATE MAFLED ^ NFAMMu�i� ' r r •52A ay specified te on item tely Please quote hdreon the lowest net bPrice You can furnish so on body ohf form.Cityreservesor sthe right obaccept Qo� eject quotations sreceived on Bidder nor all qualify quotations as all or no Y items. In order to maintain their name on City's Bidder File, Vendor should return this form whether a price is quoted or not. TOTAL _ NET UNIT PRIDE QUANTITY DESCRIPTION Replace and reinstall pump equipment, including the pump, column pipe, shaft, tubing and strainer at Well No. 17 located at 4355 Downey Road in Vernon, as per attached specification sheets. Please include total cost of the bid plus applicable sales tax on both forms. PLEASE NOTE: Please mark bid number 1397 on the outside of the envelope, otherwise bid will not be accepted. 55,al8�• 4W UNTS IF INSUFFICIENT SPACE PROVIDED ABOVE FOR PROPOSAL. ATTACH RIDER OR SUPPLEMENT • �HN QUOTED FOR PERIODS OF LESS THAN DAYS WILL NOT BE CONSIDERED WHEN ORDER IS AWARDED. BIOS RECEIVED MI RESPONSE TO THIS REQUEST FOR QUOTATION WILL BE OPEN ^CIAT PURCHASING ASI OFFICE ON THE 2&th DAY OF. vim' NOT Et Quote prieos exclusive of Soles Tax and .Exciiss Taxes. B. Indicate Excise Tax in this space $ ------------------------------------- A. Indicate Sales Tax in this space 5.--.. *aYS................. - of. 'V rr. ..9., F.0.8......_... C. Above quotations subject ro Cosh Discount ....................-_--•-•--•--••-••'-' D. 7o M d•liwred to CITY OF VERNON of ................Y:..._._.. .................................................. I -._.dos from reeei t of pu� d+ase order rites Yes sp•dh•d Wr.(t) agree ro furnish above in ............... ........... ................... r FOR ... ....... ,- ..... • .. Firnt • ..0 OPT ..-._.-... .... . .. ... ........ ................... ```.Y . .�7 • A y . COUNCIL LEONIS C. MALBURG Mayor THOMAS A. YBARRA Mayor Pro -Tern Wm. 'BILL" DAVIS Councilman H. "LARRY" GONZALES Councilman W. MICHAEL McCORMICK Councilman BRUCE V. MALKENHORST City Administrator / City Clerk FAX (323) 581-7924 CITY -HALL 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 TELEPHONE (323) 583-8811 June 20, 2000 BID SPECIFICATIONS WELL 17 REPAIR (BID No. 1397) DAVID B. BREARLEY City Attomey FAX: (626) 330-5818 KEVIN WILSON Director of Community Services & Water FAX: (323) W-2761 KENNETH J. DeDARIO Director of Municipal Utilities FAX: (323) 583-1983 DAVE TELFORD Fire Chief FAX: (323) 581-1385 BRUCE W. OLSON Police Chief FAX: (323) 583-5236 The City of Vernon is requesting quotations for the replacement and reinstallation of the pump equipment, including the pump, column pipe, shaft, tubing, and strainer at Well No. 17 located at 4355 Downey Road in Vernon. The City requests that the contractor provide firm estimates on the items listed below. If there are other items that you feel will be necessary to ensure the proper operation of the well, please include these items on a separate sheet. In addition, each bid shall include specifications of types of parts to be used as replacement parts. Wherever possible, replacement parts shall made by the same manufacturer as the original equipment. The City of Vernon requires that the contractor who is awarded this work provide a one year warranty on all work performed during the project. Any pump failures that result from leaks in the shaft tubing, premature bearing failure, or other causes related to the work performed by the contractor shall be repaired at no cost to the City. A written statement of warranty must accompany your bid sheets. Attached you will find Bid Specifications and Request for Quotation forms. The submittal of any incomplete forms will automatically disqualify the bidder from the bid process. All bids must be received in a sealed envelope and returned to the City of Vernon Finance Department no later than 2:00 p.m. XX. The Bid No.1397 must also be clearly indicated on the sealed envelope. F IWater%Well 171RFQ Well 17 Pump.doe Before the contract is awarded, the City of Vernon requires the contractor to provide proof of insurance, including a standard certificate of insurance, in at least the amounts and coverage indicated on the insurance schedule. In addition to the standard certificate of insurance, proof of general and umbrella liability coverage shall also be furnished in the form indicated on the attached insurance schedule. BID ITEMS:' ITEM 1: Replace line shaft bearings, line shaft enclosing tubes with couplings, and stainless steel line shafts (20' sections) — assemble and wrap ends to approximately 440- feet. Cost: �oI q.a0 got ITEM 2: Replace bowl assembly — Furnish and install new 14" bowl assembly to yield 1550 GPM at 360 TDH at 1200 RPM. Bowl bearings to be combo bronze and rubber type to help prevent sand intrusion. G" Cost: l ( ta 5$. ITEM 3: Replace column pipe — Furnish and install 22 sections of 12-inch column pipe, approximately 440 feet. Note these are to be 20 foot pipe sections. Cost: ITEM 4: Replace suction assembly — Furnish and install 10-inch x 10-foot long suction assembly with galvanized cone strainer. w Cost: ctS• ITEM 5: Installation — Transport and install pump equipment in well, install and wire motor, stretch shaft, set rotation and test well operation. cost: �sc-O- - ITEM 6: Sounding tube — Furnish and install 440-feet of 1-inch PVC schedule 40 sounding tube for water level measurement. Tubing shall be strapped to column pipe during pump installation and come up through the base of the discharge head. Cost: t 14 �0- ITEM 7: Disinfect well — Inject chlorine solution into well casing and hold residual in all parts of well above 250 ppm for a minimum of 48 hours; neutralize chlorine prior to discharge drain. � Cost: ,�_OCi, F-IWaterlWell 171RFQ Well V hmk .doc 2 ITEM 8: ITEM 9: ITEM 10: ITEM 11 Repair top tube assembly including new top tube. Replace top 2' section of 12" column pipe. Cost: -7 DO °,. Cost: 60,r Replace 12" x 3 %2" tube stabilizers - Quantity 8 t a a: Cost: Bail approximately 100-feet of fill and sediment from well bottom. All materials bailed from well shall be removed from well site and properly disposed of. Cost: 2) d a� ITEM 12: Please include applicable taxes. Cost: TpeluP60 c` TOTAL COST: S �� • Note: The total cost must also be included on the Request for Quotation Forms. Submitted by:�" L1�1: i�l I �-• Address:hYt%Jo�L- �A Signature: If a bidder wishes to propose additional repair alternatives, the City of Vernon is open to any suggestions so long as the repair alternative can be included in a revised Request for proposal that will be open to all bidders. ,j. E. I Waterl Well I71RFQ Well 17 Pump.doc 3 EXHIBIT 0 BEYLIK DRILLING INC. Q oos BEYLIK DRILLING, INC. 555 S. Harbor Blvd. • La Habra • California 90631 • (714) 870-5360 • (562) 691-0903 • FAX (562) 690-9192 WATER WELL DRILLING MONITORING WELLS WELL AND'PUMP REPAIR TEST HOLES CITY OF VERNON 4305 SANTA FE AVE. VERNON, CA. 90058 August 26,2000 Attention: Mr. Scott Rigg Geutlemen • In regards to your request for repairs to your Well q 17, we would advise you of the £ollowiug_ Beylik Drilling's quote is based upon using the requested 2-3/16" 416 Stainless Steel shafting. If C-1045 carbon steel is acceptable you may deduct a total of $9,130.00 from our quote for a new total of $46,857.00. Please note the C-1045 carbon steel is a industry smndard for oil lubricated deep well pumps. Should you have any questions please feel free to contact our offices. S' rely Yours L . Gomez 0 STATE OF CAUFORNIA CONTRACTOR'S NO.-306291-C-57- & SC-61 EXHIBIT BEYLIK'DRILLNG INC. BEYLIK DRILLING, INC. 555 S. Harbor Blvd. • La Habra - California 90631 • (714) 870-5360 - (562) 691-0903 - FAX (562) 690-9192 WATER WELL DRILLING - MONITORING WELLS - WELL AND PUMP REPAIR TEST HOLES FAX TRANSMITTAL FAX # 3;� 3 5 bS - Please deliver these pages to the inndividual named above. If you have difficulty receiving this transmission, or if any pages are missing, please call 562-691-0903 or 714- 870-5360 and speak to: - MESSAGEICOMMENTS A-r-TV(.. 4jL-qLL)1n Vito= �M�q - sU 2o4�r�s 43h;;i 14 how'& Rovwus "M STATE OF CAIIFORNIA CONTRACTO:R'S NO. 306291-C-57- & SC-61 & A. ' 7�'