Loading...
Resolution No. 7747A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 7747 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON AMENDING RESOLUTION NOS. 7689, 7638, 7557, 7248 AND 7062 WHICH PROVIDED FOR THE ESTABLISHMENT OF ELECTRICAL RATES TO BE CHARGED FOR ELECTRICAL ENERGY DISTRIBUTED AND SUPPLIED BY SAID CITY WITHIN ITS BOUNDARIES BY AMENDING RATE SCHEDULES D, GS-1, GS-2, LS-1, LS-2, OL-1, PA-1, PA-2, PA-TOU, TC-1, TOU-G AND.TOU-V WHEREAS, the City Council of the City.of Vernon adopted Ordinance No. 1030 on May 16, 1995, providing that rates to be charged for electrical energy distributed and supplied by the City within its boundaries shall be set by resolution; and WHEREAS, on December 16, 1997, the City Council of the City of Vernon adopted Resolution No. 7062, providing for the establishment- of electrical rates to be charged for,electrical energy distributed and supplied by the City within its boundaries; and WHEREAS, on December 15, 1998, the City Council of the City of Vernon adopted Resolution No. 7248, which amended Rate Schedules TOU-G and TOU-V; and WHEREAS, on June 20, 2000, the City Council of the City of Vernon adopted Resolution No. 7557, which amended Rate Schedules CS, D, GS-1, GS-2, LS-1, LS-2, OL-1, PA-1, PA-TOU, TC-1, TOU-G and TOU-V; and WHEREAS, on September 19, 2000, the City Council of the City of Vernon adopted Resolution No. 7638, which amended Rate Schedules D, GS-1, GS-2, LS-1, LS-2, OL-1, PA-1, PA-21 PA-TOU, TC-1, TOU-G and TOU- V; and WHEREAS, on January 17, 2001, the City Council of the City lof Vernon adopted Resolution No. 7689, which amended Rate Schedules i 1 � r Q 4F ♦ !` 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 D, GS-1, GS-2, LS-1, LS-2, OL-1, PA-1, PA-2, PA-TOU, S, TC-1, TOU-G and TOU-V; and WHEREAS, by letter dated April 12, 2001, Bruce V. Malkenhorst, City Administrator/City Clerk, recommended that the City approve increases in the electric.rates for customers in order to offset the increase in energy -related costs; and WHEREAS, the proposed electric rates are to be effective on May 1, 2001. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: - SECTION 1 The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon hereby adopts Rate Schedules D, GS-1, GS-2, LS-1, LS-2, OL-1, PA-1, PA-2, PA TOU, TC-1, TOU-G and TOU-V as the City's rates for the distribution of electrical energy supplied by the City for certain classes of service to be effective May 1, 2001, copies of which are attached hereto as Exhibit "A" and made a part hereof. SECTION 3 Any provisions contained in Resolution Nos. 7689, 7638, 7557, 7248 and 7062 not consistent with or in conflict with this resolution are hereby repealed. In all other respects, Resolution Nos. 7689, 7638, 7557, 7248 and 7062 shall remain in full force and effect. - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 4: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED 'AND ADOPTED this 18th day of April, 2001. ATTEST: BRUCE V. MALKENHORST, City Clerk ���� �✓�/ • ,b - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 i 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 7747, was duly adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Wednesday, April 18, 2001, and thereafter was duly signed by the Mayor of the City of Vernon. (SEAL) BRUCE V. MALKENHORST, City Clerk - 4 - EXHIBIT 0 r CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. D DOMESTIC SERVICE APPLICABILITY Applicable to domestic service including lighting, heating, cooking and power or combination thereof in a single-family accommodation. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Customer Charge .......................... $1.55 Energy Charge (to be added to Customer Charge): All kWh, per kWh .............. 4.512C Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge. SPECIAL CONDITIONS 1. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 2. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7638 Effective 10/01J00 Resolution No. ' 7062 Effective 01J01198 Resolution No. 7689 Effective 01/01/01 Resolution No. 7557 Effective 07/01/00 Resolution No. Effective. - 7 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. GS-1 GENERAL SERVICE APPLICABILITY Applicable to single- and three-phase general service including lighting and power. TERRITORY Within the city limits of the City of Vernon. RATES Per Meter Per Month Summer Winter Customer Charge ............................ $7.25 $7.25 Energy Charge All kWh, per kWh 11.003G 10.2330 Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge. SPECIAL CONDITIONS 1.. Voltage: Service will be supplied at one standard voltage. 2. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to service separately an X-ray installation, the billing will be increased by $1.03 per kVA of transformer capacity requested. Authorized by the City of Verb Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective 01/01/98 Resolution No. 7557 Effective 07/Oi/00 Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective D1&2Q Resolution No. Effective ` t . Schedule GS-1 (cont.) 3. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. 4. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 5. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. 6. Excess Transformer Capacity: The amount of transformer capacity requested by a customer which is in excess of the applicable standard transformer size determined by the Utility as required to serve the customer's measurable kilowatt demand. Excess transformer capacity shall be available to all customers under this schedule and shall be billed at $1.03 per kVA per month. 7. Seasons: The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. 8. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7638 Effective 10/01/00 Resolution No. 7062 Effective QI /98 Resolution No. 7689 Effective 01/01/01 Resolution No. 7557 Effective 07/01/00 Resolution No. Effective 2 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. GS-2 GENERAL SERVICE APPLICABILITY Applicable to single- and three-phase general service including lighting and power. This schedule is not applicable to customers with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use recording meters have been installed. TERRITORY " Within the city limits of the City of Vernon. RATES Per Meter Per Month Demand Charge: All kW of billing demand, per kW* ................. $10.04 Energy Charge (to be added to Demand Charge): All kWh, per kWh ............................. 6.3470 *(Subject to Contract Demand. See Special Condition No. 9.) Minimum Charge: The Demand Charge plus the Energy Charge shall be subject to a monthly minimum charge of $200.85. Authorized by the City of Vernon Ordinance No 9440_ Effective 12/06/83 Resolution No. 7062 Effective 01/01/98 Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective 01/01/01 Resolution No. Effective - Schedule GS-2 (cont.) SPECIAL CONDITIONS 1. Voltage: Service will be supplied at one standard voltage. 2. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined to the nearest kW 3. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute interval in the month. 4. Voltage Discount: The charges including adjustment will be reduced by 3 % for service delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3 % discount will be entitled to a 4 % discount. 5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 6. X-Ray Installations: Where the Utility installs the standard transformer capacity requested by a customer to serve separately an X-Ray installation, the minimum charge will be increased by $1.03 per kVA of transformer capacity requested. Authorized by the City of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 7062 Effective Ol/Ol/98 Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 10101/00 Resolution No. 7689 Effective QI&L/Q Resolution No. Effective - 2 T ' T Schedule GS-2 (cont.) 7. Tempos Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer prior to resuming service within twelve months after such service was discontinued will be required to pay all charges which would have been billed if service had not been discontinued. 8. Excess Transformer CapacitX: The transformer capacity in excess of a customer's contract demand either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month. 9. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt - ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the kilowatt demand, whichever is less and is expressed in kilowatts. 10. Minimum Demand Charge: Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. 11. Dieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 12. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. 13. Recording Meters: A recording -type meter shall be installed for all customers purchasing under this schedule and having peak requirements of 500 kW or more. Customers having recording -type meters are not eligible to purchase under this schedule and must be transferred to Schedule No. TOU-V. 14. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or \to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation. Authorized by the City of Vernon Ordinance No 940 Effective 12/U6/83Resolution No. 7638 Effective 10/Oi/00 Resolution No. M Effective Ol/Ol/98 Resolution No. 7689 Effective 01/01/01 Resolution No. 7557 Effective 07/Ol/00 Resolution No. Effective 3 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. LS-1 LIGHTING -STREET AND HIGHWAY UTILITY -OWNED SYSTEM APPLICABILITY Applicable to street and highway lighting service supplied from overhead lines where the Utility owns and maintains the street lighting equipment. TERRITORY Within the city limits of the City of Vernon. RATE Lamp Size -Lumens High Pressure Sodium Vapor Lamps Energy Curtailment Service Midnight or All Night Service Equivalent Service . Facilities Charge Per Lamp Per Month Per Lamp Per Month Per Lamy Per Month 5,800 Lumens $ 8.00 $ 7.46 $ 5.51 9,500 Lumens 9.27 8.29 5.67 16,000 Lumens 11.58 10.06 6.18 22,000 Lumens 13.57 11.51 6.54 25,500 Lumens 14.82 12.39 6.59 47,000 Lumens 20.96 16.71 6.90 Authorized by the Ci of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective 01/01/9§, Resolution No. 7557 Effective 07/Ol/00 Resolution No. 7638 Effective 10/Ol/00 Resolution No. 7689 Effective -01M / —1 Resolution No. Effective 1 Schedule LS-1 (cont.) SPECIAL CONDITIONS Standard Equipment Furnished: Bracket or mast arm construction will be furnished. Where feasible with existing facilities, center suspension construction may be furnished. Enclosed luminaires will be furnished for lamps of 2,500 lumens, or larger, and open reflector lighting units will be furnished for lamps of 1,000 lumens. Such standard lighting equipment will be attached to wood poles. 2. Other than Standard Equipment: Where the customer requests the installation of other than the standard equipment furnished by the Utility and such requested equipment is acceptable to the Utility, the Utility will install the requested equipment provided the customer agrees to advance the estimated difference in cost installed between such equipment and standard equipment. Advances made in connection with such agreements become and remain the sole property of the Utility; as do the said equipment. 3. Hours of Service: Under the Utility's standard all night operating schedule approximately 4,140 hours of service per year will be furnished. 4. Removal or Modification of Equipment: Where street lighting service and facilities were ordered removed or modified by a customer and such services and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of such reinstallation a nonrefundable amount equal to the cost of removal or modification of the prior facilities and the estimated cost of such reinstallation. Facilities removed or installed remain the sole property of the Utility. 5. Energy Curtailment Service: a. Where the Customer requests the installation and/or removal of equipment in order to obtain Energy Curtailment Service, and such request is acceptable to the Utility, the Utility will comply with such request provided the customer first agrees to pay to the Utility the estimated installation cost for any additional equipment required and/or the removal cost of any equipment currently installed. Such payments will not be refunded and shall be paid in advance or in installments acceptable to Utility over a period of not to exceed three years. Facilities installed in connection with such request become and remain the sole property of the Utility. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7638 Effective 10/Ol/00 Resolution No. 7062 Effective--UM-1/8 Resolution No. 7689 Effective Oi/01101 Resolution No. 7557 Effective 07/01/00 Resolution No. Effective 2 Schedule LS-1 (cont.) b. Under the Utility's midnight (PST) or equivalent service operating schedule, approximately 2,090 hours of service per year will be furnished. C. Facilities charges shall be applicable under this schedule only when the Utility has been requested to discontinue the existing service by the customer and the customer has stipulated that the facilities are to be left in place for future use. 6. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No.940 Effective 12/06/83 Resolution No. 7062 Effective_Ol/02§- Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective OU01/Ol Resolution No. Effective 3 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. LS-2 LIGHTING -STREET AND HIGHWAY CUSTOMER -OWNED INSTALLATION APPLICABILITY Applicable to service for the lighting of streets, highways, other public thoroughfares, and publicly - owned and publicly -operated automobile parking lots which are open to the general public, where the customer owifs the street lighting equipment. TERRITORY Within the city limits of the City of Vernon. RATES RATE A-UNMETERED SERVICE: For each kW of lamp load, per kW ......... RATE B-METERED SERVICE: Meter Charge: Multiple Service ............ Series Service .... .... Energy Charge (to be added to Meter Charge): All kWh, per kWh .......... RATE C-MAINTENANCE SERVICE -OPTIONAL: In addition to the Rate A or Rate B charges. Authorized by the City of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 7062 Effective 01/Ol/98 Resolution No. 7557 Effective 07/Ol/00 " Per Month All Night Service Midnight Service Mulfiple Sgds Multiple suita $26.89 $34.95 $15.65 $19.01 Per Meter Per Month $ 4.64 $12.36 7.5720, Resolution No. 7638 Effective 10/01/00 Resolution No. 7698 Effective 01/01/01 Resolution No. Effective 1 Schedule LS-2 (cont.) Lamp Rating Per Lamp Lumens Lamp Type Per Month 1,000* Incandescent Extended Service .................... $0.34 2,500* Incandescent Extended Service .................... 0.39 4,000* Incandescent Extended Service .................... 0.41 6,000* Incandescent Extended Service .................... 0.43 10,000* Incandescent Extended Service .................... 0.46 3,500* Mercury Vapor ................................ 0.37 7,000* Mercury Vapor .............................. 0.34 11,000* Mercury Vapor ........................... 0.41 20,000* - Mercury Vapor ............................. 0.37 35,000* Mercury Vapor .............................. 0.56 55,000* Mercury Vapor .............................. 0.50 5,800 High Pressure Sodium Vapor ..................... 0.82 9,500 High Pressure Sodium Vapor ..................... 0.82 16,000 _ High Pressure Sodium Vapor ..................... 0.80 22,000 High Pressure Sodium Vapor ..................... 0.81 25,500 High Pressure Sodium Vapor ..................... 0.81 47,000 High Pressure Sodium Vapor ..................... 0.83 SPECIAL CONDITIONS 1. Ownership of Facilities: a. For multiple systems, the Utility will deliver service 120/240 volt overhead circuits. For series systems the Utility will furnish and maintain constant current regulating transformers and deliver service at the secondary side of such transformers. b. The customer will furnish and maintain all utilization equipment beyond the point of delivery except for maintenance service provided by the Utility in accordance with Special Condition 3. C. Meter locations for multiple systems shall be at points mutually agreed upon. Meter locations for series systems shall be on the primary supply circuit to the constant current regulating transformer at a point acceptable to the Utility. *Closed to new installation as of November 1, 1997 Authorized by the City of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 7062 Effective I Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 10/01/00 Resolution No. 7698 Effective Ol/Ol/Ol Resolution No. Effective 2 Schedule LS-2 (cunt.) 2. Lamp Load: The lamp load for regular (general purpose) multiple incandescent lamps shall be the manufacturers' lamp rating in watts. The lamp load in watts for lumen rated street lighting lamps shall be as follows: HIGH MERCURY PRESSURE INCANDESCENT VAPOR SODIUM PRESSURE MULTIPLE SERIES GROUP GROUP EXTENDED REPLACEMENT EXTENDED LUMENS REGULAR REPLACEMENT SVS. REGULAR Svc. SVS. MULT, SERIES Watts Watts Watts Watts Watts Watts Watts Watts Watts 600* 55 58 -- 42 45 -- -- — - 800* — -- -- 57 -- -- - 1,000* 85 92 103 62 65 73 -- -- - 2,500* 175 189 202 143 152 164 -- -- -- 3,500* -- -- -- -- ---- 125 -- -- 4,000* 268 295 327 210 -- 251 -- -- -- 5,800* -- -- -- -- 220 -- -- 82 85 6,000* 370 405 448 310 325 364 -- -- -- - 208 -- — 9,500 -- -- -- -- -- -- — 140 121 10,000* 575 620 690 525 558 605 -- — — 11,000* -- -- -- -- ---- 292 -- - 15,000* 800 860 - 755 822 — 447 -- — 16,000 -- -- -- -- ---_ -- 202 174 20,000* -- -- -- — ---- 447 -- -- 22,E -- -- -- -- ---- -- 248 233 25,000* -- -- 1,275 - — — -- -- 25,500 -- -- -- -- -- ---- 320 -- 35,000* -- -- — -- ---- 753 -- 47,000 — -- — -- -- ---- 485 -- 55,000* -- -- — -- — — 1,058 -- -- Total lamp load shall be determined to the nearest 1 / 10 kW . *Closed to new installation as of November 1, 1997. Authorized by the City of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 7062 Effective O1f01/98 ^ Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 1O/01/00 Resolution No. 7698 Effective Ol/OL Resolution No. Effective 3 Schedule LS-2 (cont.) 3. Maintenance Service: Maintenance service furnished by the Utility under Rate C for the lamps specified shall include the following: a. Renewal of lamps after the original installation by the customer. b. Regular inspection. C. Periodic cleaning of globes. d. Labor of replacing lamps and globes. Incandescent lamps furnished under this provision will be extended service lamps only. Mercury, vapor lamps and high pressure sodium vapor lamps furnished under this provision will be as specified by the Utility. Globes for renewal shall be furnished by the customer. Maintenance service will be furnished only where, in the opinion of the Utility, no undue hazard or expense will result because of location, mounting height, or other reasons, 4. Switching Facilities: For all night or midnight (Pacific Standard Time) service under the Utility's standard operating schedules, the Utility will furnish, maintain, and operate the necessary switching facilities. For other operating schedules, the customer shall furnish, maintain, and operate switching facilities as specified by the Utility and take metered service under Rate B. 5. Hours of Service: Under the Utility's standard all night operating schedule, approximately 4,140 hours of service per year will be furnished and under the Utility's standard midnight (Pacific Standard Time) operating schedule approximately 2,090 hours of service per year will be furnished. 6. Removal of Equipment: Where street lighting service and facilities were ordered removed by a customer and such service and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal of the prior facilities and the estimated cost of such reinstallation. Utility -owned facilities removed or installed remain the sole property of the Utility. 7. Energy Curtailment Service: Where the customer requests the installation and/or removal of equipment in order to curtail energy requirements, and such request is acceptable to the Utility, the Utility will comply with such request provided the customer first agrees to pay to Utility the estimated cost installed or any additional equipment required and/or the removal cost of any equipment currently installed. Authorized by the City of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 7638 Effective 10/Oi/00 Resolution No. 7062 Effective Ol/o1/98 Resolution No. 7698 Effective OlMI& Resolution No. 7557 Effective 07/01/00 Resolution No. Effective 4 Schedule LS-2 (cont.) Such payments will not be refunded and shall be paid in advance or in installments acceptable to Utility over a period of not to exceed three years. Facilities installed in connection with such requests become and remain the sole property of the Utility. 8. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 9. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No 940 Effective 12/06/83 Resolution No. 7638 Effective 10/Ol/00 Resolution No. 7062 Effective Ol/Ol/98 Resolution No. 7698 Effective O1/01/O1 Resolution No. 7557 Effective 07/Ol/00 Resolution No. Effective CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. OL-1 OUTDOOR AREA LIGHTING SERVICE APPLICABILITY Applicable to outdoor area lighting service, other than street and highway lighting service, supplied from overhead lines where the Utility owns and maintains the area lighting equipment. TERRITORY Within the city limits of the City of Vernon. RATES LUMINAIRE CHARGE: Enemy Curtailment Service Midnight or All Night Service Equivalent Service Facilities Charge Lamp Size -Lumens Per Lame Per Month Per Lamp Per Month Per Lamy Per Month High -Pressure Sodium Vapor Lamps 5,800 Lumens ......... $ 8.27 $ 7.78 $5.56 9,500 Lumens ......... 9.68 $ 8.79 $5.72 22,000 Lumens .... $14.45 $12.57 $6.59 POLE CHARGE (to be added to Luminaire Charge): Per Pole Per Month For each additional new wood pole installed ..... $2.67 tzuuavaucu vy u11, �iLX vi rciiivii Ordinance No. 940 Effective 12/06/83 Resolution No. 7638 Effective 10/01/00 Resolution No. 7062 Effective Ol/Ol/98 . Resolution No. 7689 Effective /01 Ol/01 Resolution No. 7557 Effective 07/01/00 Resolution No. Effective - I Schedule OL-i (cont.) SPECIAL CONDITIONS 1. Hours of Service: Area all night lighting service will be furnished from dusk to dawn, approximately 4,140 hours per year, by Utility -owned luminaires supplied from the Utility's existing 120/240 volt overhead circuits and mounted on existing Utility -owned wood poles as standard equipment. 2. Other Than Standard Equipment: Where the customer requests the installation of other than the standard equipment furnished by the Utility and such requested equipment is acceptable to the Utility, the Utility will install the requested equipment provided the customer agrees to advance the estimated difference in installation cost installed between such equipment and standard equipment. Advances made for this purpose will not be refunded. Facilities installed in connection with such agreements become and remain the sole property of the Utility. Utility will provide customer with adjusted per lamp charges and customer will pay such charges. 3. Service and Facilities Furnished: This service will be in accordance with Utility's specifications as to the equipment, installation, maintenance, and operation. 4. Replacement of Lamps: The Utility will replace lamps on a scheduled basis, and individual lamps will be replaced upon service failure, as soon as practical after notification by customer, subject to Utility's operating schedules. 5. Contract: A written contract for a term of three year will be required by the Utility when service is first established under this schedule. 6. Type of Service: This service will be furnished only where the installation is considered by the Utility to be of a permanent and established character. 7. Removal or Modification of Equipment: Where area lighting service and facilities were ordered removed or modified by a customer and such service and facilities, or their equivalent, are ordered reinstalled within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the prior facilities and the estimated cost of such reinstallation. Facilities removed or installed remain the sole property of the Utility. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7638 Effective 10/Ol/00 Resolution No. 7062 Effective Ol/Ol/98 Resolution No. 7689 Effective QJMJ Ol Resolution No.. 7557 Effective 07/01/00 Resolution No. Effective 2 Schedule OL-1 (cont.) 8. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 9. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective O M112B Resolution No. 7557 Effective 0jMjLQ0 Resolution No. 7638 Effective 10/01J00 Resolution No. 7689 Effective Oi&ER Resolution No. Effective 3 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. PA-1 POWER -AGRICULTURAL AND PUMPING CONNECTED LOAD BASIS APPLICABILITY Applicable to power service for general agricultural purposes or for general water or sewerage pumping TERRITORY Within the city limits of the City of Vernon. RATES Horsepower of Connected Load Monthly Service Charge Per Meter Per Meter Per hp 2 and over ............. $1.03 Energy Charge to be added to Service Charge -Rate All kWh, per kWh .................... 10.152C Minimum Charge: The monthly minimum charge shall be the monthly Service Charge. SPECIAL CONDITIONS 1. of e: Service will be supplied at one standard power voltage. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective Ui/Ul/g8 Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective Ol/01/01 Resolution No. Effective - I Schedule PA-1 (cont.) 2. Connected Load: Connected load is the sum of the rated capacities of all of the customer's equipment that it is possible to connect to the Utility's lines at the same time, determined to the nearest 1/10 hp. In no case will charges be based on less than 2 hp for single-phase service or no less than 3 hp for three-phase service. The rated capacity of the customer's equipment will be the rated horsepower output of standard rated motors, and the rated kilovolt -ampere input capacity of other equipment, with each kilovolt -ampere of input considered equal to one horsepower. Normally such ratings will be based on the manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of the Utility, be based on tests or other reliable information. 3. Overloaded Motors: Whenever, upon test, any motor under normal operating conditions is found to be delivering more than 115 percent of its capacity as indicated by its nameplate rating, the Utility may disregard the nameplate rating and base its charges upon the output as calculated from test. Any motor which is billed on a basis in excess of its nameplate rating in accordance with this special condition shall be rested at intervals to be determined by the Utility or upon notification by the customer of a permanent change in operating conditions. 4. Tempos Reduction of Connected Load: Where the use of energy is seasonal or intermittent, no adjustment will be made for any temporary reduction of connected load. Any customer, prior to resuming service on such connected load within 12 months after it was disconnected, will be required to pay all charges which would have been billed if the temporary reduction of connected load had not been made. 5. In -Lieu Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 6. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective Ol/O B Resolution No. 7557 Effective 07/Ol/00 Resolution No. 7638 Resolution No. 7689 Resolution No. Effective 10/Ol/00 Effective 01MI& Effective - 2 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. PA-2 POWER -AGRICULTURAL AND PUMPING DEMAND BASIS APPLICABILITY Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is subject to meter availability. TERRITORY Within the city limits of the City of Vernon. RATE Per Meter Per Month Demand Charge: First 75 kW or less of billing demand .............. $540.75 All excess kW of billing demand, per kW ........... $ 7.21 Energy Charges (to be added to Demand Charge): All kWh per kWh ........................... 7.802C Minimum Charge: The monthly minimum charge shall be the monthly Demand Charge. SPECIAL CONDITIONS 1. Volta Service will be supplied at one standard voltage. Authorized by the Cb of Vernon Ordinance No.940 Effective 12/06/83 Resolution No. 7638 Effective 101 UW Resolution No. 7062 Effective 01/01/98 Resolution No. 7689 Effective 01/01/01 Resolution No. 7557 Effective 07/Ol/00 Resolution No. Effective 0 Schedule PA-2 (cont.) 2. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 50% of:the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 75 M. Billing demand shall be determined to the nearest kW. 3. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month. Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. 4. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 5. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued. 6. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/ 3 Resolution No. 7638 Effective 10/Ol/00 Resolution No. 7062 Effective Ol/0M Resolution No. 7689 Effective Ol&JM Resolution No. 7557 Effective 07/Ol/00 Resolution No. Effective 2 Schedule PA-2 (cont.) 8. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month. 9. Contract Demand: A contract demand will be established by the Utility, based on applicant's demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt -ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts. 10. Minimum Demand Charge: Where a contract, demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. Authorized by the City of Vernon Ordinance No. 940 „ Effective 121Q&D Resolution No. 7638 Effective 10/01/00 Resolution No. 7062 Effective 0110IL28 Resolution No. 7689 Effective 01/01/01 Resolution No. 7557 Effective' Q2aj 00 Resolution No. Effective 3 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. PA-TOU BOWER -AGRICULTURAL AND PUMPING TIME -OF -USE APPLICABILITY Applicable to power service for general agricultural purposes for general water or sewerage pumping. Service under this schedule is elective for customers with a monthly maximum demand that exceeds 100 kW for three months during the preceding twelve months but are less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is subject to meter availability. TERRITORY I Within the city limits of the City of Vernon. Customer Charge ................................ Demand Charge (to be added to Customer Charge): All kW of on -peak maximum billing demand, per kW .... Plus all kW of mid -peak maximum billing demand, per kW Plus all kW of off-peak billing demand, per kW ........ Per Meter Per Month $159.50 $ 10.635 $ 1.650 No Charge* Energy Charge (to be added to Demand Charge): All on -peak kWh, per kWh ............ 5.3520, Plus all mid -peak kWh, per kWh .................. 5.0170 Plus all off-peak kWh, per kWh .................. 4.515C *(Subject to Minimum Demand Charge. See Special Condition No. 1.1.) Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective 01/01/98 Resolution No. 7557 Effective 07/Ol/UO Resolution No. 7638 Effective JWgJ 00 Resolution No. 7689 Effective Ol/Ol/01 Resolution No. Effective. Schedule PA-TOU (cone.) SPECIAL CONDITIONS 1. Time Period: Time Periods are defined as follows: On -Peak: 1:00 p.m. to 7:00 p.m. Summer Weekdays except holidays 5:00 p.m. to 10:00 p.m. Winter weekdays except holidays Mid -Peak 9:00 a.m. to 1:00 p.m. and 7:00 p.m. to 11:00 p.m. Summer weekdays except holidays 8:00 a.m. to 5:00 p.m. Winter weekdays except holidays Off -Peak: All other hours: Off -Peak. Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday. The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. 2. Voltage: Service will be supplied at one standard voltage. Authorized by the City of Vernon Ordinance No.941 Effective 12/06/83 Resolution No. 7062 Effective 01101/98 Resolution No. 7557 Effective 07/ JM Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective Ol/01101 Resolution No. Effective 2 Schedule PA-TOU (cont.) 3. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not less than 25 % of the highest maximum demand established in the preceding eleven months, however, in no case shall the billing demand be less than 50 kW. Billing demand shall be determined to the nearest kW . 4. Maximum Demand: The maximum demand in any month shall be the measured maximum average kilowatt input, indicated or recorded by instruments to be supplied by the Utility, during any 15-minute metered interval in the month. Where demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. 5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three consecutive months, a kilovar-hour meter will be installed as soon as practical, and, thereafter, until the billing demand has been less than 150 kW for twelve consecutive months, the charges will be adjusted each month for power factor, as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 33 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 6. Temporary Discontinuance of Service: Where the use of energy seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued. 7. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 8. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No. 940 Resolution No. 7062 Resolution No. 7557 Effective 12/06/83 Resolution No. 7638 Effective 10/01/00 Effective 01/01/98 Resolution No. 7689 Effective 01/01/Ol Effective 07/01/00 Resolution No. Effective 3 Schedule PA-TOU (cont.) 9. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month. 10. Contract Demand: A contract demand will be established by the Utility, based on applicant's demand requirements for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt -ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts. 11. Minimum Demand Charge Where a contract demand is established, the monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. Authorized h the City of Vernon Ordinance No. 940 Effective 1ZM /83 Resolution No.�7062 Effective Ol/Oil98s,, Resolution No. 7557 Effective 07/Ol/00 Resolution No. 7638 Effective 10/O1100 Resolution No. 7689 Effective OlMM-1 Resolution No. Effective 4 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. TC-1 TRAFFIC CONTROL SERVICE APPLICABILITY Applicable to single-phase service for traffic -directional signs or traffic -signal systems located on streets, highways and other public thoroughfares and to railway crossing and track signals. TERRITORY Within the city limits of the City of Vernon. RATES Customer Charge: Energy Charge (to be added to Customer Charge): All kWh, per kWh ...................... . Minimum Charge: The monthly minimum charge shall be the monthly Customer Charge. SPECIAL CONDITIONS Per Meter Per Month $4.89 9.033C 1. Voltage: Service will be supplied at one standard voltage not in excess of 240 volts or, at the option of the Utility, at 240/480 volts, three -wire, single-phase. 2. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 3. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. Authorized by the City of Vernon Ordinance No.940 Effective 12/06/U Resolution No. 7062 Effective QI&LI $ - Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective 01/01/_Q Resolution No. Effective 1 1 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. TOU-G GENERAL SERVICE -LARGE APPLICABILITY Applicable to.:single- and three-phase general service including lighting and power. Service under this schedule is elective for customers served under Schedule No. GS-2 with a monthly maximum demand that exceeds 200 kW for three months during the preceding twelve months but is less than 500 kW for any nine months during the preceding twelve months. Service under this schedule is elective for all existing customers with time of use metering who have been taking service under Schedule TOU-V with a monthly maximum demand that exceeds 200 kW for three months during the preceding twelve months but is less than 500 kW for any nine months during the preceding 12 months. Service under this schedule is subject to meter availability. Within the city limits of the City of Vernon. RATES Customer Charge .. .............................. . Demand Charge (to be added to Customer Charge): All kW of on -peak maximum billing demand, per kW ....... Plus all kW of mid -peak maximum billing demand, per kW .... Plus all kW of off-peak billing demand, per kW ........... PER METER PER MONTH Summer Winter May. June. Oct July. August, Seot Nov. duu April $159.50 $159.50 $159.50 $ 8.999 $ 10.635 $ 8.999 $ 1.650 $ 1.650 $ 1.650 No Charge* No Charge* No Charge* Energy Charge (to be added to Demand Charge): ............ All on -peak kWh, per kWh ......................... 5.330C 6.645C 5.330C Plus all mid -peak kWh, per kWh ..................... 4,995C 6.310C 4.995C Plus all off-peak kWh, per kWh ...................... 4.4930 5.176C 4.493C *(Subject to Minimum Demand Charge. See Special Condition No. 9.) of Verno Ordinance No. 940 , Effective 12/06/83 Resolution No. 7062 Effective Ol/Ol/98 Resolution No. 7248 Effective Ol/Ol/99: Resolution No. 7557 Effective�Q7/Ol/OO Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective Oi/Ol/Ol Resolution No. Effective - I Schedule TOU-G (cont.) SPECIAL CONDITIONS 1. Time Period: Time Periods are defined as follows: 1:00 p.m. to 7:00 p.m. Summer Weekdays except holidays 5:00 p.m. to 10:00 p.m. Winter weekdays except holidays Mid -Peak 9:00 a.m. to 1:00 p.m. and 7:00 p.m. to 11:00 p.m. Summer weekdays except holidays 8:00 a.m. to 5:00 p.m. Winter weekdays except holidays All other hours: Off -Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday. The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. 2. Billing Demand: Separate billing demands for the on -peak, mid -peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW. 3. Maximum Demand: The maximum demands shall be established for the on -peak, mid - peak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15- minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective 01/01/98 Resolution No. 7248 Effective Ol/O1J99 Resolution No. 7557 Effective 07/01/00. Resolution No. 7638 Effective 10/Ol/0o Resolution No. 7689 Effective Ol/Ol/Ol Resolution No. Effective- 7 Schedule TOU-G (cont.) 4. Voltage Discount: The charges including adjustment will be reduced by 3 % for service delivered and metered at voltages of from 2 kV through 10 kV; by 4 % for service delivered and metered at voltages of from 11 kV through 50 kV; and by 5 % for service delivered and metered at voltages over 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3 % discount will be entitled to a 4 % discount. 5. Power Factor Adjustment: a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at Less than 4 M The charges will be adjusted each month for the power factor as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in kilowatts and kilovars shall be determined to the nearest unit. A racket device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued. Authorized by the City of Vernon Ordinance No. 940 Effective 12106/83 Resolution No. 7638 Effective 10/0l/00 Resolution No. 7062 Effective O1/01198 Resolution No. 7689 Effective ol/Ol/Ol Resolution No. 7248 Effective ol/Ol/99 Resolution No. Effective Resolution No. 7557 Effective 07i01/00 3 Schedule TOU-G (cont.) 7. Excess Transformer Capacity: A transformer capacity in excess of a customer's contract demand which is either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at$1.03 kVA per month. 8. Contract Demand: A contract demand will be established by the Utility, based upon' applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts. 9. Minimum Demand Charge: Where a non -time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. 10. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. 11. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 12. Voltage: Service will be supplied at one standard voltage. 13. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective-DIM-1/8 Resolution No. 72Q _ Effective o1/Ol/,Q Resolution No. 7557 Effective 07/Ol/00 Resolution No. 7638 Effective 10/011 Resolution No. 7689 Effective 0I&ILQl . Resolution No. - Effective 4 CITY OF VERNON LIGHT AND POWER DEPARTMENT Schedule No. TOU-V GENERAL SERVICE -LARGE APPLICABILITY This schedule is applicable for all customers with demands of 500 kW or higher for any three months during the preceding twelve months and for whom time of use meters have been installed. TERRITORY Within the city limits of the City of Vernon. RATES PER METER PER MONTH Summer Winter May, June, Oct July. August. Sent Nov. thru April Customer Charge ............................... $159.50 $159.50 $159.50 Demand Charge (to be added to Customer Charge): All kW of on -peak maximum billing demand, per kW ..... $ 8.427 $ 10.295 $ 6.677 Plus all kW of mid -peak maximum billing demand, per kW .. $ ,1.597 $ 1.597 $ 1.597 Plus all kW of off-peak billing demand, per kW ......... No Charge* No Charge* No Charge* Energy Charge (to be added to Demand Charge): All on -peak kWh, per kWh ..... .................. 5.063C 6.362C 5.063C Plus all mid -peak kWh, per kWh . ................ 4.7380 6.037C 4.738C Plus all off-peak kWh, per kWh .. ................. 4.251C 4.915C 4.251C *(Subject to Minimum Demand Charge. See Special Condition No. 9.) Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective 01/01/98 Resolution No. 7248 Effective Old Resolution No. 7557 Effective 07/01/00 Resolution No. 7638 Effective 10/01/00 Resolution No. 7689 Effective Ol/Ol/Ol Resolution No. Effective - I Schedule TOU-V (cont.) SPECIAL CONDITIONS 1. Time Period: Time Periods are defined as follows: On -Peak Mid -Peak 1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and Summer weekdays except holidays 7:00 p.m. to 11:00 p.m. 5:00 p.m. to 10:00 p.m. Summer weekdays except holidays Winter weekdays except holidays 8:00 a.m. to 5:00 p.m. Winter weekdays except holidays All other hours: Off -Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in November), and Christmas Day (December 25). When any holiday listed above falls on Sunday, the following Monday will be recognized as an off-peak period. No change in off-peak will be made for holidays falling on Saturday. The summer season time periods shall commence at 12:01 a.m. May 1 and continue through October 31 of each year and the winter season time periods shall commence at 12:01 a.m. November 1 and continue through April 30 of the following year. 2. Billing: Demand: Separate billing demands for the on -peak, mid -peak, and off-peak time periods shall be established for each monthly billing period. The billing demand for each time period shall be the maximum demand for that time period occurring during the respective monthly billing period. The billing demand shall be determined to the nearest kW. 3. Maximum Demand: The maximum demands shall be established for the on -peak, mid -peak, and off-peak periods. The maximum demand for each period shall be the measured maximum average kilowatt input indicated or recorded by instruments during any 15-minute metered interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute interval may be used. e City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7062 Effective Ol/Ol/98 Resolution No. 7248 Effective—QI&M. Resolution No. 7557 Effective 07/Ol/00 Resolution No. 7638 Effective 10/Ol/00 Resolution No. 7689 Effective Ol/Ol/Ol Resolution No. Effective 2 t Schedule TOU-V (cont.) 4. Voltage Discount: The charges including adjustment will be reduced by 3 % for service delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service delivered and metered at voltages of from 11 kV through 50 kV; and by 5 % for service delivered and metered at voltages over 50 kV; except that when only one transformation from a transmission voltage level is involved, a customer normally entitled to a 3 % discount will be entitled to a 4 % discount. 5. Power Factor Adjustment: a. `Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted each month for reactive demand as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The maximum reactive demand shall be the highest measured maximum average kilovar demand indicated or recorded by metering to be supplied by the Utility during any 15-minute metered interval in the month. The kilovars shall be determined to the nearest unit. A ratchet device will be installed on each kilovar meter to prevent reverse operation of the meter. b. Service Delivered and Metered at Less than 4 M The charges will be adjusted each month for the power factor as follows: The charges will be increased by 20 cents per kilovar of maximum reactive demand imposed on the Utility in excess of 20 percent of the maximum number of kilowatts. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be installed on the kilovar-hour meter to prevent its reverse operation on leading power factors. 6. Temporary Discontinuance of Service: Where the use of energy is seasonal or intermittent, no adjustments will be made for a temporary discontinuance of service. Any customer, prior to resuming service within twelve months after such service was discontinued, will be required to pay all charges which would have been billed if service had not been discontinued. Authorized by the City of Vernon Ordinance No. 940 Effective 12/06/83 Resolution No. 7638 Effective 10/01/00 Resolution No. 7062 Effective Ol l/98 Resolution No. 7689 Effective ILQJLOl Resolution No. 7248 Effective O DI/-99 . Resolution No. Effective Resolution No. 7557 Effective 07/01/00 3 Schedule TOU-V (cont.) 7. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract demand either required by the Utility because of the nature of the customer's load or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA per month. 8. Contract Demand: A contract demand will be established by the Utility, based upon applicant's demand requirements for any customer newly requesting service on this schedule and for any customer of record on this schedule who requests an increase or decrease in transformer capacity in accordance with the Light and Power Department Rules for Electric Service. A contract demand arrangement is available upon request for all customers of record on this schedule. Contract demand is based upon the nominal kilovolt - ampere rating of the Utility's serving transformer(s) or the standard transformer size determined by the Utility as required to serve the customer's stated measurable kilowatt demand, whichever is less and is expressed in kilowatts. 9. Minimum Demand Charge: Where a non -time related maximum demand or contract demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of contract demand. 10. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased by 3 percent to reflect payments in -lieu of tax and franchise payments. 11. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge is 2.85 percent of the total bill before any special fees or charges. In accordance with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed through January 1, 2012. 12. Voltage: Service will be supplied at one standard voltage. 13. Removal or Modification of Equipment: Where transformers or facilities for services are ordered removed or modified by a customer and such services are restored within 36 months from the date of the order to remove or to modify, the customer shall pay to the Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or modification of the transformers or facilities of the prior installation and the estimated cost of such reinstallation. Authorized k the City of Vernon Ordinance No.940_ Effective 12/06/83 Resolution No. 7638 Effective 10/Ol/00 Resolution No. 7062 Effective Ol/Ol/98 Resolution No. 7689 Effective OlMIM Resolution No. 7248 Effective Ole Resolution No. Effective Resolution No. 7557 Effective 07/Ol/00 4 SUPPORTING DOCUMENTS CITY COUNCIL LEONIS C. MALBURG Mayor THOMAS A. YBARRA Mayor Pro —Tern WM. "BILL" DAVIS Councilman H. "LARRY" GONZALES Councilman W. MICHAEL MCCORMICK Councilman BRUCE V. MALKENHORST City Administrator / City Clerk FAX (323) 581-7924 City Council City of Vernon CITY HALL 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 TELEPHONE (323) 583-8811 EDUARDO OLIVO City Attorney FAX: (562) 927-8722 KEVIN WILSON Director of Community Services & Water FAX: (323) 588-2761 KENNETH J. DeDARIO Director of Municipal Utilities FAX: (323) 583-1983 STEVEN E. PARKER Fire Chief FAX: (323) 581-1385 BRUCE W. OLSON Police Chief FAX: (323) 583-5236 April 12, 2001 \� G Honorable Members: Due to the turmoil in the Electrical Energy Arena, the Utilities Department has been reviewing it budgetary position. Due to the increasing energy costs and the financial position of many electric agencies the department is proposing an electric rate increase of 1.189 cents per kWh effective May 1, 2001. This is equal to an average rate increase of approximately 19%. Even with this increase the City will continue to be below Edison's electric rates by approximately 30-48% and LADWP's by approximately 5-27%, thus remaining competitive. It is hereby recommended that Vernon's electric rates be increased pursuant to the above stated information and adopted effective May 1, 2001. Very truly yours, Bruce V. Malkenhorst City Administrator/City Clerk BVM/ng April 11, 2001 TO: Bruce V. Malkenhorst, City Administrator FROM: Kenneth J. DeDario, Director of Utilities NL-__ SUBJECT: Electric Rates Recent events have only magnified the electrical energy crisis in California. Pacifi,-Gas & Electric Co. (PG&E) and the Power Exchange (PX) have declared bankruptcy while PG&E, the PX and Southern California Edison Co. (Edison) have defaulted on obligations and the Independent System Operator (ISO) has ceased paying bills. In addition, the cost of energy and ISO services continues to rise with no imminent relief in sight. The Utilities Department proposed budget for Fiscal Year 2001-2002 reflects a revenue shortfall of approximately $14.3 million. This is mainly due to an increase in energy related costs from various ISO services such as: ancillary services, grid management charge, transmission access charge, in -balance energy, and neutrality (a combination of many other miscellaneous charges). Since the increase in cost is primarily a direct result of the increase in energy costs, I recommend that the shortfall be collected from kWh sales. I specifically recommend an average retail electric rate increase of 1.189 cents per kWh effective May 1, 2001. This change translates to an average rate increase of approximately 19%. In spite of this electric rate increase, the City's electric rates will remain one of the lowest in the state. Additionally before this rate increase, Vernon's electric rates were from approximately 35 — 57% Edison and from approximately 17 — 40% below the Los Angeles Department of Water & Power (LADWP). After this rate increase, Vernon's electric rates will be below Edison's electric rates by approximately 30 — 48% and LADWP's by approximately 5 — 27%. Also, LADWP has a 121/2% city electricity users tax on commercial and industrial customers and 10% on residential customers and other exempt non-profit organizations. Vernon's electric rates will continue to be very competitive. Based on the above, I recommend that the attached electric rate schedules be adopted effective May 1, 2001. If you have any questions or comments, please contact me. Thank you for your consideration. KJD:dm Attachments 12-MONTH REVENUE VERSUS EXPENSE PROJECTION FISCAL YEAR 2002 Expense Projection TOTAL RETAIL LOAD (MWh) 1,203,457 DEPARTMENT BUDGET Utilities Administration $6,064,408 E&O $7,473,635 Customer Service $730,438 Street Lighting $298,553 Resource Planning . Committed Capacity and Energy $70,160,966 . Uncommitted Energy $4,106,285 . Other Cost $21,015,649 . A&GE $1,501,175 Less: Capital Expenditure ($4,438,000) Total $106,913,108 Revenue Projection Based on Current Rates $93,019,376 Power Resources Cost Reduction Account $4 $93,019,376 Projected Deficit Projected Deficit $13,893,732 In -lieu of tax increase (3% of deficit) $416,812 $14,310,544 Proposed Rate Increase (¢/kWh) 1.19 Effect of Rate Increase on Retail Rates Based on Current Average New Rate Rates With Rate increase Change % Change increase (¢/kWh) (¢/kWh) Retail Revenue TOU-V $44,100,699 $53,785,096 $9,684,397 21.96% 1.189 6.604' TOU-G $6,973,453 $8,221,161 $1,247,708 17.89% 1.189 7.835 PA-TOU $207,631 $243,476 $35,845 17.26% 1.189 8.077 GS2 $18,399,083 $21,059,109 $2,660,026 14.46% 1.189 9.414 GS1 $5,012,006 $5,636,207 $624,201 12.45% 1.189 10.737 Residential $5,031 $6,722 $1,691 33.61% 1.189 4.727 Pump/Agr $154,221 $172,685 $18,464 11.97% 1.189 11.121 Traffic Control $55,019 $62,752 $7,733 14.06% 1.189 9.649 Street Lighting $6,387 $7,553 $1,166 18.26% 1.189 7.700 Outside Lighting $109,841 $117,458 $7,617 6.93% 1.189 18.336 Unknown $275,412 $297,106 $21,694 7,88% 1.189 16,285 Total $75,298,782 $89.609.326 $14.310.544 19.01°k 1-M ZA46 Adjusted Net Revenue $0 4/11 /01 [A.A.] RstudyAP01.xls 0401 Rates plus .04 for sce + .01189 for COV Customer Type and Load LADWP ($) SCE ($) Vernon ($) DWP SCE WINTER 10,000 kWh 1,150.30 1,445.50 1,036.30 9.91 % 28.31 % 40 kW - 50,000 kWh 4,896.63 6,551.25 4,679.50 4.43% 28.57% 150 kW 100,000 kWh 9,768.26 13,056.48 9,218.00 5.63% 29.40% 300 kW 250,000 kWh 18,020.35 26,410.51 15,556.02 13.68% 41.10% 350 kW 300,000 kWh 29,238.04 34,920.76 22,397.40 23.40% 35.86% 1,000 kW 600,000 kWh 51,000.87 66,226.68 35,704.00 29.99% 46.09% 1,000 kW - 2,000,000 kWh 171,676.80 219,859.16 132,604.01 22.76% 39.69% 5,000 kW 7,000,000 kWh 487,458.80 620,658.76 398,115.00 18.33% 35.86% 10,000 kW J-A-S 10000 kWh 40 kW 50000 kWh 150 kW 100000 kWh 300 kW 250000 kWh 350 kW 300,000 kWh 1,000 kW 600,000 kWh 1,000 kW 2,000,000 kWh 5,000 kW 7,000,000 kWh 1,196.70 1,755.50 1,036.30 13.40% 40.97% 5,056.89 7,713.75 4,679.40 7.46% 39.34% 10,088.78 15,381.48 9,218.00 8.63°% 40.07% 18,401.85 29,123.01 18,252.81 0.81 % 37.33% 30,326.04 55,360.44 29,203.93 3.70% 47.25% 54,647.32 102,221.36 45,064.00 17.54% 55.92% 176,874.80 323,561.88 169,955.70 3.91% 47.47% 498,058.80 781,997.71 476,949.00 4.24% 39.01% c jrs - 4/11/01 1 0401 Rates plus .04 for sce + .01189 for COV Customer type and load LADWP ($) SCE ($) Vernon ($) DWP SCE W.1-O 1,150.30 1,345.50 1,036.30 9.91% 22.98% 4,896.63 6,051.25 4,679.50 4.43% 22.67% 9,768.26 12,056.48 9,218.00 5.63% 23.54% 18,020.35 23,910.51 15,556.02 13.68% 34.94% 29,238.04 31,920.76 22,397.40 23.40% 29.83% 51,000.87 60,226.68 35,704.00 29.99% 40.72% 171,676.80 199,859.16 132,604.01 22.76% 33.65% 487,458.80 550,658.76 398,115.00 18.33% 27.70% AVERAGE 1,161.90 1,498.00 1,036.30 10.81 % 30.82% 4,936.70 6,716.88 4,679.48 5.21% 30.33% 9,848.39 13,387.73 9,218.00 6.40% 31.15% 18,115.73 26,463.64 16,230.22 10.41% 38.67% 29,510.04 39,280.68 24,099.03 18.34% 38.65% 51,912.48 73,725.35 38,044.00 26.72% 48.40% 172,976.30 240,784.84 141,941.93 17.94% 41.05% 490,108.80 643,493.50 417,823.50 14.75% 35.07% jrs - 4/11/01