Loading...
Resolution No. 78761 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 KIM 21 22 23 24 25 26 27 28 RESOLUTION NO. 7876 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON AMENDING RESOLUTION NO. 7813, WHICH APPROVED AND AUTHORIZED THE FILING OF PERMIT TO CONSTRUCT AND TITLE V APPLICATIONS AND RELATED DOCUMENTS WITH THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT REGARDING THE MALBURG GENERATING STATION AND AUTHORIZED THE CITY TO DO ALL OTHER ACTIONS DEEMED NECESSARY OR ADVISABLE CONCERNING THE APPLICATION PROCESS WHEREAS, the City of Vernon is in the process of developing a 120 MW Combined Cycle Power Plant officially named the Malburg Generating Station (the "Malburg Project") for the purpose of installing additional generating capacity that will yield an efficient, cost-effective, and reliable source of electric generation to the City lof Vernon; and WHEREAS, on August 1, 2001, the City Council of the City of Vernon adopted Resolution Nos. 7812 and 7813, which approved the filing of an Application for Certification (the "AFC") with the California Energy Commission (the "CEC") and a Permit to Construct and Title V Application with the South Coast Air Quality Management District (the "AQMD"), to undertake the Malburg Project in two phases, respectively; and WHEREAS, the City has decided, based upon changes in the wholesale electric power market and the additional costs required for air quality emissions control equipment, to build the Malburg Project in one phase consisting of the installation and operation of several major items of equipment, including two combustion turbine generator units (the "CTGs"), each equipped with a heat recovery steam generator 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 (the "HRSG"), which provides steam to power a single steam turbine (generating unit (the "STG"), being operated in a combined cycle mode; land WHEREAS, Section 25550 of the California Public Resources Code' establishes the procedural requirements for expediting thermal power plant facility permits with the CEC; and WHEREAS, the City of Vernon desires the Malburg Project to be considered under the CEC's six month "fast -track" permitting process; and WHEREAS, the CEC has exclusive authority and jurisdiction to certify the sites of new power plants in excess of 50 MW; and WHEREAS, the CEC is the lead agency to certify, permit and authorize the construction of power plants, in conjunction with all local, regional and state licenses and permits; and WHEREAS, the City is required to submit in its AFC all the information required for a Permit to Construct under the Rules and Regulations of the AQMD (the "Rules"), to enable the AQMD to evaluate the Malburg Project's potential air quality impacts and conduct a Determination of Compliance (the "DOC") review of the City's AFC to establish that the proposed facility meets the requirements of all applicable sections of the federal Clean Air Act (the "Act"), stationary source regulatory programs required by the Act, and all other applicable Rules and issue a DOC letter to the CEC; and WHEREAS, as part of the CEC's six month "fast track" certification process, the City is required to submit the following documents to the AQMD: an Application for a Permit to Construct and Operate the Malburg Project, (the "Permit to Construct"), and supplemental applications consisting of a Title V Operating Permit - 2 - 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 WE Application (the "Title V Application"), a Title IV Acid Rain Permit Application, a Modification to Reclaim Facility (Identification Number 014502) Permit Application and other applications which may be required by the AQMD, as dictated by the City's facility design specifications (the "AQMD Applications"); and WHEREAS, the Rules require the City to obtain emissions reduction credits (the "ERCs") and additional credits under the AQMD's Reclaim Program (the "Reclaim Credits"), in order to commission, start-up and operate the Malburg Project; and WHEREAS, the City deems it prudent to authorize the City Administrator to obtain all the ERCs and Reclaim Credits necessary to permit and operate the Malburg Project; and WHEREAS, the City deems it beneficial and advantageous to the CEC's data adequacy determination of the City's AFC, to submit the AQMD Applications to the AQMD prior to the submission of the AFC to the CEC, in order to receive a timely DOC letter for the CEC; and WHEREAS, by letter dated November 19, 2001, the City Administrator/City Clerk, has recommended that the City Council approve the Permit to Construct, Title V Application, Title IV Acid Rain Application and Modification to Reclaim Facility Permit Application, and authorize their submittal to the AQMD. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon hereby approves and authorizes the filing of an Application for a Permit to - 3 - 1 Construct and operate the Malburg Project with the AQMD. 2 SECTION 3: The City Council of the City of Vernon hereby 3 approves and authorizes the filing of the supplemental applications 4 consisting of the Title V Application (City of Vernon Environmental 5 Protection Agency, "EPA," ID No. 000031305), Title IV Acid Rain 6 Permit, the Modification to Reclaim Facility (Facility Identification 7 Number 014502) Permit, and any other necessary applications (the 8 "Supplemental Applications"), at the City Administrator's direction 9 and required by the AQMD licensing process for the Malburg Project. 10 SECTION 4: The City Council of the City of Vernon hereby 11 authorizes the City Administrator, or his authorized designee, to 12 execute said Permit to Construct and the Supplemental Applications 13 for, and on behalf of, the City of Vernon. 14 SECTION 5: The City Administrator, or his authorized 15 designee, is hereby authorized to obtain, purchase and secure all the 16 ERCs and Reclaim Credits that are necessary to permit, commission, 17 start-up and operate the Malburg Project. 18 SECTION 6: The City Administrator, or his authorized 19 designee, is hereby authorized and empowered to undertake any acts and 20 execute any documents necessary to secure, implement and carry out the 21 purposes of this Resolution, the Permit to Construct and the 22 Supplemental Applications. 23 SECTION 7: The City Administrator, or his authorized 24 designee, is hereby authorized to make whatever changes, upon advice 25 of counsel, to the Permit to Construct and the Supplemental 26 Applications and all related documents that become necessary to 27 implement and carry out the purposes of this Resolution. 28 - 4 - 1 SECTION 8: The City Council of the City of Vernon hereby 2 directs the City Clerk, or his designee, to send the Permit to 3 Construct, the Supplemental Applications and a copy of the AFC and a 4 permit processing fee not to exceed Four Thousand Dollars and No Cents 5 ($4, 000.00) to: 6 South Coast Air Quality Management District Attn. John T. Yee, Senior Air Quality Engineer 7 21865 East Copley Drive 8 Diamond Bar, CA 91765-4182 9 SECTION 9: The City Clerk of the City of Vernon shall 10 certify to the passage of this resolution, and thereupon and 11 thereafter the same shall be in full force and effect. 12 APPROVED AND ADOPTED this 28th day of November, 2001. 13 14� f 15 EONIS C. MAL91JRG, Major 16 ATTEST: 17 18 19 BRUCE V. MALKENHORST, City Clerk 20 21 22 23 24 25 26 27 28 5 - 1 1 STATE OF CALIFORNIA ) 2 ) ss COUNTY OF LOS ANGELES ) 3 4 I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do 5 hereby certify that the foregoing Resolution, being Resolution No. 6 7876, was duly adopted by the City Council of the City of Vernon at an 7 adjourned regular meeting of the City Council duly held on Wednesday, 8 November 28, 2001, and thereafter was duly signed by the Mayor of the 9 City of Vernon. 10 11 BRUCE V. MALKENHORST, City Clerk 12 13 (SEAL) 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 - 6 - CITY COUNCIL LEONIS C. MALBURG Mayor THOMAS A. YBARRA Mayor Pro-Tem WM. `BILL" DAVIS Councilman H. "LARRY" GONZALES Councilman W. MICHAEL MCCORMICK Councilman BRUCE V. MALKENHORST City Administrator / City Clerk FAX (323) 826-1438 City Council City of Vernon Honorable Members: EDUARDO OLIVO City Attorney FAX: (562) 927-8722 KEVIN WILSON Director of Community Services & Water FAX: (323) 826-1435 CITY HALL 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 TELEPHONE (323) 583-8811 November 19, 2001 c� KENNETH J. DeDARIO Director of Municipal Utilities FAX: (323) 826-1425 STEVEN E. PARKER Fire Chief FAX: (323) 826-1407 BRUCE W. OLSON Police Chief FAX:(323)826-1481 On August 1, 2001, this legislative body approved and authorized the filing of various documents with the South Coast Air Quality Management District (AQMD) regarding the Malburg Generating Station. After further review by staff and the City Attorney, it is hereby recommended that Resolution No. 7813 adopted August 1, 2001 be amended to approve the filing of Permit to Construct, Title V applications and related documents with the AQMD under the six (6) month fast track permitting process. This amendment will also allow the City Administrator to acquire the needed emissions reduction credits for the Malburg Generating Project. Very truly yours, Bruce V. Malkenhorst City Administrator/City Clerk . r CITY COUNCIL LEONIS C. MALBURG Mayor THOMAS A. YBARRA Mayor Pro -Tern WM. 'BILL" DAVIS Councilman H. "LARRY" GONZALES Councilman W. MICHAEL MCCORMICK Councilman BRUCE V. MALKENHORST City Administrator / City Clerk FAX (323) 581-7924 CITY HALL 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 TELEPHONE (323) 583-8811 November 20, 2001 Mr. Bruce V. Malkenhorst City Administrator City Of Vernon 4305 Santa Fe Avenue Vernon, California 90058 DUARDO OLIVO City Attorney FAX: (562) 927-8722 KEVIN WILSON Director of Community Services & Water FAX: (323) 588-2761 KENNETH J. DeDARIO Director of Municipal Utilities FAX: (323) 583-1983 STEVEN E. PARKER Fire Chief FAX: (323) 581-1385 BRUCE W. OLSON Police Chief FAX: (323) 583-5236 Re: Revised Request For Resolutions Of The City Council To Approve The City's Applications To The California Energy Commission And The South Coast Air Quality Management District To Construct The Malburg Generating Station Dear Bruce: You have previously authorized submitting resolutions to the City Council for the November 28, 2001 meeting to approve filing permit applications with the California Energy Commission and the Air Quality Management District ("AQMD"). I request that the California Energy Commission resolution be held back until the City Council meeting of December 5, 2001. The City's air quality consultant, Parson's Engineering, will revise air emissions data from revised figures to be submitted by Alstom Power. This delay is necessary in order to minimize the required amount of air emissions credits the City must purchase to commission, start up and operate the power plant in the combined cycle mode. I further request that you consider submitting the attached revised resolution concerning the filing of the AQMD permit Mr. Bruce V. Malkenhorst November 20, 2001 Page 2 application for the November 28, 2001 City Council meeting. This resolution additionally authorizes you to acquire the needed emissions reduction credits ("ERCs") for the Malburg Project, either directly from the AQMD's priority reserve or from outside vendors, to comply with the AQMD air quality requirements. There are many price competitive offers for ERCs in the market today, and it is in the best interests of the City to empower you to act upon these opportunities. The City will need these ERCs no later than June, 2002, in order to begin construction of the plant. I look forward to discussing this matter with you at your earliest convenience. Sincerely, 2: V-11� Eric Fresch Legal Counsel EF: j 1 Enclosure cc: Eddie Olivo Ken DeDario Ramon Abueg Jorge Somoano Sharon Johnson Chuck Montoya 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 7876 11/20/01 3:53 PM A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON AMENDING RESOLUTION NO. 7813, WHICH APPROVED AND AUTHORIZED THE FILING OF PERMIT TO CONSTRUCT AND TITLE V APPLICATIONS AND RELATED DOCUMENTS WITH THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT REGARDING THE MALBURG GENERATING STATION AND AUTHORIZED THE CITY TO DO ALL OTHER ACTIONS DEEMED NECESSARY OR ADVISABLE CONCERNING THE APPLICATION PROCESS WHEREAS, the City of Vernon is in the process of developing a 120 MW Combined Cycle Power Plant officially named the Malburg Generating Station (the "Malburg Project") for the purpose of installing additional generating capacity that will yield an efficient, cost-effective, and reliable source of electric generation to the City of Vernon; and WHEREAS, on August 1, 2001, the City Council of the City of Vernon adopted Resolution Nos. 7812 and 7813, which approved the filing of an Application for Certification .(the "AFC") with the California Energy Commission (the "CEC") and a Permit to Construct and Title V Application with the South Coast Air Quality Management District (the "AQMD"), to undertake the Malburg Project in two phases, respectively; and WHEREAS, the City has decided, based upon changes in the wholesale electric power market and the additional costs required for air quality emissions control equipment, to build the Malburg Project in one phase consisting of the installation and operation of several major items of equipment, including two combustion turbine generator units (the "CTGs"), each equipped with a heat recovery steam generator 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 MM ME (the "HRSG"), which provides steam to power a single steam turbine (generating unit (the "STG"), being operated in a combined cycle mode; Iand WHEREAS, Section 25550 of the California Public Resources Code establishes the procedural requirements for expediting thermal power plant facility permits with the CEC; and WHEREAS, the City of Vernon desires the Malburg Project to be considered under the CEC's six month "fast -track" permitting process; and WHEREAS, the CEC has exclusive authority and jurisdiction to certify the sites of new power plants in excess of 50 MW; and WHEREAS, the CEC is the lead agency to certify, permit and authorize the construction of power plants, in conjunction with all local, regional and state licenses and permits; and WHEREAS, the City is required to submit in its AFC all the information required for a Permit to Construct under the Rules and Regulations of the AQMD (the "Rules"), to enable the AQMD to evaluate the Malburg Project's potential air quality impacts and conduct a Determination of Compliance (the "DOC") review of the City's AFC to establish that the proposed facility meets the requirements of all applicable sections of the federal Clean Air Act (the "ACT"), stationary source regulatory programs required by the Act, and all other applicable Rules and issue a DOC letter to the CEC; and WHEREAS, as part of the CEC's six month "fast track" certification process, the City is required to submit the following documents to the AQMD: an Application for a Permit to Construct and Operate the Malburg Project, (the "Permit to Construct"), and supplemental applications consisting of a Title V Operating Permit - 2 - 1 Application (the "Title V Application"), a Title IV Acid Rain Permit 2 Application, a Modification to Reclaim Facility (Identification Number 3 014502) Permit Application and other applications which may be 4 required by the AQMD, as dictated by the City's facility design 5 specifications (the "AQMD Applications"); and 6 WHEREAS, the City deems it beneficial and advantageous to 7 the CEC's data adequacy determination of the City's AFC, to submit the 8 AQMD Applications to the AQMD prior to the submission of the AFC to 9 the CEC, in order to receive a timely DOC letter for the CEC; and 10 WHEREAS, by letter dated November 19, 2001, the City 11 Administrator/City Clerk, has recommended that the City Council 12 approve the Permit to Construct, Title V Application, Title IV Acid 13 Rain Application and Modification to Reclaim Facility Permit 14 Application, and authorize their submittal to the AQMD. 15 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE 16 CITY OF VERNON AS FOLLOWS: 17 SECTION 1: The City Council of the City of Vernon hereby 18 finds and determines that the recitals contained hereinabove are true 19 and correct. 20 SECTION 2: The City Council of the City of Vernon hereby 21 approves and authorizes the filing of an Application for a Permit to 22 Construct and operate the Malburg Project with the AQMD, a copy of 23 which has been presented to the City Council concurrently with this 24 Resolution, and the City Council hereby orders said Permit to 25 Construct to be received and filed by the City Clerk. 26 SECTION 3: The City Council of the City of Vernon hereby 27 approves and authorizes the filing of the supplemental applications 28 consisting of the Title V Application (City of Vernon Environmental 1 Protection Agency, "EPA," ID No. 000031305), Title IV Acid Rain 2 Permit, the Modification to Reclaim Facility (Facility Identification 3 Number 014502) Permit, and any other necessary applications (the 4 "Supplemental Applications"), at the City Administrator's direction 5 and required by the AQMD licensing process for the Malburg Project. 6 SECTION 4: The City Council of the City of Vernon hereby 7 authorizes the City Administrator, or his authorized designee, to 8 execute said Permit to Construct and the Supplemental Applications 9 for, and on behalf of, the City of Vernon. 10 SECTION 5: The City Administrator, or his authorized 11 designee, is hereby authorized and empowered to undertake any acts and 12 execute any documents necessary to secure, implement and carry out the 13 purposes of this Resolution, the Permit to Construct and the 14 Supplemental Applications. 15 SECTION 6: The City Administrator, or his authorized 16 designee, is hereby authorized to make whatever changes, upon advice 17 of counsel, to the Permit to Construct and the Supplemental 18 Applications and all related documents that become necessary to 19 implement and carry out the purposes of this Resolution. 20 SECTION 7: The City Council of the City of Vernon hereby 21 directs the City Clerk, or his designee, to send the Permit to 22 Construct, the Supplemental Applications and a copy of the AFC and a 23 permit processing fee not to exceed Three Thousand Dollars and No 24 Cents ($3,000.00) to: 25 South Coast Air Quality Management District Attn. John T. Yee, Senior Air Quality Engineer 26 21865 East Copley Drive 27 Diamond Bar, CA 91765-4182 28 - 4 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 8: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 28th day of November, 2001. ATTEST: BRUCE V. MALKENHORST, City Clerk LEONIS C. MALBURG, Mayor - 5 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 7876, was duly adopted by the City Council of the City of Vernon at an adjourned regular meeting of the City Council duly held on Wednesday, November 28, 2001, and thereafter was duly signed by the Mayor of the City of Vernon. (SEAL) BRUCE V. MALKENHORST, City Clerk - 6 - 3 CITY COUNCIL t LEONIS C. MALBURG Mayor THOMAS A. YBARRA Mayor Pro—Tem WM. 'BILL" DAVIS Councilman H. "LARRY" GONZALES Councilman W. MICHAEL MCCORMICK Councilman BRUCE V. MALKENHORST City Administrator / City Clerk FAX (323) 826-1438 December 5, 2001 Ms. Sharon Johnson Deputy City Treasurer City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 CITY HALL 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 TELEPHONE (323) 583-8811 Re: Malburg Generating Station Project; Check for Permit Fees Dear Sharon: EDUARDO OLIVO City Attorney FAX: (562) 927-8722 KEVIN WILSON Director of Community Services & Water FAX: (323) 826-1435 KENNETH J. DeDARIO Director of Municipal Utilities FAX: (323) 826-1425 STEVEN E. PARKER Fire Chief FAX: (323) 826-1407 BRUCE W. OLSON Police Chief FAX: (323)826-1481 Please draw a check in the amount of Two Thousand One Hundred Ohe and 39/100 ($2,101.39), made payable to the South Coast Air Quality Management District (AQMD) for the fees due for the filing of the Permit to Construct and Operate Application to the AQMD. This represents the balance due for total fees of $15,490.03, less the credit applied for moneys tendered from a previous submission, as per the attached documents. These fees have been authorized by the City Council pursuant to check is needed by the end of today. Please have the check deli Call me if you have any questions. Sincerely, Eric Fresch EF:ah Attachments c: Bruce V. Malkenhorst Kenneth J. DeDario Ramon Z. Abueg lution No. 7876. The to Ramon Abueg. Page 1 of d Abueg, Ramon From: Chris Perri [CPerri@agmd.gov] Sent: Thursday, August 30, 2001 1:18 PM To: 'rabueg@ci.vernon.ca.us' Cc: 'beller@energy.state.ca.us'; John Yee; Tran Vo Ramon: RE: A/N's 389635, 389636, 389637, 389638, 389639, 389640, 389641, 389642, 389643, 389644 We received your letter of August 22, 2001 stating that the City will be amending or re -filing its AFC with the California Energy Commission for the proposed Malburg Generating Station. We understand that the project description has changed in that the proposal for simple cycle operation in the summer of'02 has been eliminated, and instead the turbines will be constructed and operated as combined cycle units only, to begin operation in summer '03. We further understand that the revised application package, including air quality information, pertaining to the combined cycle operation will not be available until mid -October of this year. In light of these facts, the AQMD will cancel the City's pending applications submitted to us on August 2, 2001 for the simple cycle turbines. The City will need to refile applications for the combined cycle units, the associated control equipment, and the ammonia tank when the necessary permitting information becomes available. The application fees submitted with the initial filing will be refunded. If you have any comments or concerns about this issue, please contact me at (909) 396-2696. Thank you. Chris Perri Air Quality Engineer South Coast AQMD 12/4/2001 i Application for Permit to Construct Malburg Generating Station Project Fees • SECTION 6 FEES A gas turbine less than or equal to 50 MW is listed as Schedule D in Rule 301 Permit Fees. An SCR/Catalyst system is Schedule C. The Emergency IC Engines are Schedule B. Equipment/Process Schedule MW Gas Turbine <— 50 MW D SCR NOx and CO Catalyst Control System C Emergency IC Engines > 500 HP B Aqueous Ammonia Storage Tank C Item Fee,1" Equip Fee for each additional identical Equipment Total Fee Schedule D — 2 $3,731.89 $1,865.95 $5,597.84 Schedule C — 2 $2,101.39 $1,050.70 $3,152.09 Schedule B - 5 $662.44 331.22 $1,987.32 Schedule C —1 $2,101.39 $2,101.30 RECLAIM Permit Fee 550.00 Total $13,388.64 6-1 K:\Reports\R1379 (Vemon)\Permit\SEC6.D0C 8/1/01