RESOLUTION NO. 7898
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON APPROVING AND AUTHORIZING THE EXECUTION OF
AMENDMENT NO. TWO TO THE AGREEMENT FOR PROFESSIONAL
CONSULTING SERVICES BY AND BETWEEN THE CITY OF
VERNON AND PARSONS ENGINEERING SCIENCE, INC. AND
RATIFYING THE EXECUTION OF AN AUTHORIZATION FOR
ADDITIONAL WORK
WHEREAS, the City of Vernon is in the process of developing
the Malburg Generating Station Combined Cycle Power Plant (the
"Project") for the purpose of installing additional generating
capacity; and
WHEREAS, on June 20, 2001, the City Council of the City of
Vernon adopted Resolution No. 7790 approving and authorizing the
execution of an Agreement for Professional Consulting Services (the
"Agreement") with Parsons Engineering Science, Inc. ("Parsons"); and
WHEREAS, on September 19, 2001, the City Council of the City
of Vernon adopted Resolution No. 7831 approving and authorizing the
execution of an Amendment No. One to the Agreement ("Amendment One")
with Parsons; and
WHEREAS, environmental permitting support is needed to
complete the Application for Certification ("AFC") for submission to
the California Energy Commission ("CEC") and the Permit to Construct
application and other license applications for submission to the South
Coast Air Quality Management District ("AQMD") for the Project; and
WHEREAS, in order to meet the urgent need for the
environmental permitting support, on January 14, 2002, the City
Administrator executed a Letter of Authorization to Parsons for
additional work to validate a verbal authorization given on
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
January 11, 2002, subject to ratification by the City Council; and
WHEREAS, on January 11, 2002, the AQMD issued a "Letter of
Completeness" to the City signifying that all eleven (11) of the
City's permit applications that were filed with the AQMD are complete
and can be processed for approval, thereby satisfying a major
condition of the City's AFC filed with the CEC; and
WHEREAS, in accordance with Sections 6 and ll.G of the
Agreement, the City of Vernon and Parsons desire to amend the
Agreement to incorporate changes to the scope of services and the
adjustment of compensation and completion time required therefor; and
WHEREAS, the City Council desires to approve and ratify the
Letter of Authorization for additional air quality work for the
Project; and
WHEREAS, by letter dated January 17, 2002, Bruce V.
Malkenhorst, City Administrator/City Clerk, has recommended that a
second amendment to the Agreement be approved and executed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
land correct.
SECTION 2: The City Council of the City of Vernon hereby
approves and ratifies the execution of the Letter of Authorization to
(Parsons, a copy of which is attached hereto as Exhibit "A" and made a
1part hereof.
SECTION 3: The City Council of the City of Vernon hereby
approves the Amendment No. Two to the Agreement for Professional
Consulting Services with Parsons, a copy of which is attached hereto
- 2 -
as Exhibit "B" and made a part hereof.
SECTION 4: The City Council of the City of Vernon hereby
authorizes the Mayor and the City Clerk to execute said Amendment for,
and on behalf of, the City of Vernon.
SECTION 5: The City Council of the City of Vernon hereby
directs the City Clerk, or his designee, to send one fully executed
Amendment to:
Parsons Engineering Science, Inc.
Attn. Krishna Nand, Ph.D., Q.E.P., Project Manager
100 W. Walnut Street
Pasadena, CA 91124
SECTION 6: The City Clerk of the City of Vernon shall
certify to the passage of this resolution, and thereupon and
thereafter the same shall be in full force and effect.
APPROVED AND ADOPTED this 22°d day of January, 2002.
ATTEST:
BRUCE V. MALKENHORST, City Clerk
LEONIS C. MALB RG, Ma or
- 3 -
1 STATE OF CALIFORNIA )
2 ) ss
COUNTY OF LOS ANGELES )
3
4 I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do
5 hereby certify that the foregoing Resolution, being Resolution No.
6 7898, was duly adopted by the City Council of the City of Vernon at an
7 adjourned regular meeting of the City Council duly held on Tuesday,
8 January 22, 2002, and thereafter was duly signed by the Mayor of the
9 City of Vernon.
10
BRUCE V. MALKENHORST, City Clerk
12
13 (SEAL)
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4 _
SUPPORTING
DOCUMENTS
EXHIBIT
A
CITY COUNCIL
LEONIS C. MALBURG
Mayor
THOMAS A. YBARRA
Mayor Pro-Tem
WM. 'BILL" DAVIS
Councilman
H. "LARRY" GONZALES
Councilman
W. MICHAEL MCCORMICK
Councilman
BRUCE V. MALKENHORST
City Administrator / City Clerk
FAX (323) 581-7924
January 14, 2002
VIA U.S. MAIL
CITY HALL
4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058
TELEPHONE (323) 583-8811
Mr. Krishna Nand, Ph.D., Q.E.P.
Project Manager
Parsons Engineering Science, Inc.
100 W. Walnut Street
Pasadena, CA 91124
EDUARDO OLIVO
City Attorney
FAX: (562) 927-8722
KEVIN WILSON
Director of Community Services & Water
FAX: (323) 588-2761
KENNETH J. DeDARIO
Director of Municipal Utilities
FAX: (323) 583-1983
STEVEN E. PARKER
Fire Chief
FAX: (323) 581-1385
BRUCE W. OLSON
Police Chief
FAX: (323) 583-5236
Re: Authorization For Additional Work; Malburg Generating
Station ("MGS") Project
Dear Mr. Nand:
This letter shall serve as authorization to Parsons Engineering
Science, Inc. ("Parsons") to undertake the work tasks described
in Table l attached to this letter.
All work tasks undertaken by Parsons shall be as needed by the
City at the direction of authorized City personnel. All the
terms and conditions of the existing City contract with Parsons
for the MGS Project remain in full force and effect.
The remuneration to Parsons for the work tasks authorized herein
in attached Table 1 shall not exceed the amounts enumerated in
said Table 1. If the City requires less work from Parsons for
Krishna Nand, Ph.D., Q.E.P.
January 14, -2002
Page 2
task items described in Table 1, then Parsons shall receive its
reasonable time and materials for that task item.
Sincerely,
CITY OF VERNON
Bruce V. Malkenhorst
City Administrator/City Clerk
BVM:jl
Enclosure
cc: Eddie Olivo
Ken DeDario
Ramon Z. Abueg
January 7, 2002
Page 2
Table 1
Cost Estimate
Cost
Task
1. Preparation of revised traffic and transportation, biology, cultural
noise, and geologic hazards
$35,000
resources, paleontology, socioeconomic,
to incorporate the impacts from the reclaimed water and
sections
sewer pipeline in the Application for Certification (AFC).
$75,000
2. Multiple revisions of the air permit and air quality section of the
air dispersion modeling and health risk assessment
AFC, including
due to numerous changes in the Combustion Turbine Generator
design data (emission characteristics).
$15,000
3, preparation of air quality cumulative analysis report
$20�000
4. Provide support in obtaining air permit from the South Coast Air
Quality Management District.
$10,000
CEMS Application for SCAQMD
5. Provide assistance in preparing
approval
6. Provide assistance in developing source test protocol, obtaining
approval for the protocol, and coordinating the source
$10,000
SCAQMD's
testing and preparation of the source test report.
$4,000
7. Provide assistance in obtaining acid rain credits (SO2 credit).
8. Provide assistance in obtaining emission (CO, Mo, and NOx)
$5,000
credits.
training, and completing
$10,000
9. Data recovery, cultural resources awareness
the Native American Consultation.
after
$20,000
10, Develop community noise awareness program, noise monitoring
and develop the plant startup P noise contours.
action plan, and
$20,000
11. Provide assistance in developing IIPP, emergency
facility fire prevention and protection plan.
$10,000
12. Preparation of hazardous materials inventory and business plan.
$25,000
13. Preparation of California Accidental Release Prevention Program.
$30,000
14. Develop waste management plan including the spill control and
prevention
management procedures, prepare storm water pollution
conditional exemption limiting permit, prepare
plan, prepare
Industrial Waste Water Discharge Permit, obtain EPA ID Number
and amendment of City
and register as a hazardous waste generator,
hazardous materials establishment permit for Station "A"
of Vernon
Generating Station.
faults (geological hazards) within 60 miles from the
$2,000
15. Identify principal
project site.
c:\d=\W& -1_a-
Ramon Z. Abueg
January 7, 2002
Page 3
Table 1(continued)
Cost Estimate
Cost
Task
16. Provide support in responding to California Energy Commission's $50,000
comments on the AFC. it is presumed that no new additional studies
will be required for the MGS. $30,000
17. Project Management $371,000
Total Labor Cost
$20,00
ODCs (travel, reproduction, and communication costs) $39 0 00
TOTAL COST
EXHIBIT
�Lmonlemini 1 •'
•'• to) �•1 y 0 X*JI Z &1 01 ft I a 4
THIS AMENDMENT NO. TWO TO THE AGREEMENT FOR PROFESSIONAL
CONSULTING SERVICES is made, entered into and executed in duplicate
originals, either copy of which may be considered and used as the
original hereof for all purposes, as of this day of January,
2002, in the City of Vernon, County of Los Angeles, California
BY AND BETWEEN
THE CITY OF VERNON
(hereinafter referred to as
the "City")
4305 Santa Fe Avenue
Vernon, CA 90058
PARSONS ENGINEERING SCIENCE,'
INC., a Unit of Parsons
Infrastructure & Technology
Group Inc. (hereinafter
referred to as "Consultant")
100 West Walnut Street
Pasadena, CA 91124
WHEREAS, the City and Consultant are parties to an Agreement
for Professional Services dated on or about June 20, 2001 in connection
with the proposed Malburg Generating Station Combined Cycle Power
Plant (the "Project"); and
WHEREAS, the City and Consultant are parties to an Amendment
No. One to the Agreement for Professional Consulting Services dated on
or about September 19, 2001 ("Amendment One") in connection with the
Project; and
WHEREAS, the City and Consultant desire to amend the Agreement
to provide for additional work tasks and compensation for
environmental permitting support to complete the Application for
Certification ("AFC") for submission to the California Energy
Commission ("CEC") and a Permit to Construct application for
1
submission to the South Coast Air Quality Management District
2
("SCAQMD") for the Project; and
3
WHEREAS, Section 6 of the Agreement allows for changes and
4
additions to the services to be performed by Consultant, the scope of
5
the Agreement and the adjustment of compensation and completion time
6
required thereof; and
7
WHEREAS, Section ll.G of the Agreement provides for
8
amendments and modifications to the Agreement.
9
NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET
10
FORTH HEREIN:
11
SECTION 1: In addition to the services outlined in the
12
SCOPE OF SERVICES section in the Agreement and Amendment No. One,
13
Consultant shall be available to perform the services as detailed in
14
Exhibit "A" which is attached hereto and incorporated herein by
15
reference. All such work tasks undertaken by Consultant shall be on
16
an as -needed basis and shall be completed at the direction of the
17
City.
18
SECTION 2: In addition to the compensation to be paid to
19
Consultant under the Agreement and Amendment No. One, the City will
20
pay Consultant on a time -and -materials basis, according to the hourly
21
rates set forth in Table 5-2 of the Agreement, for tasks performed
22
pursuant to Section 1 above. The total amount paid to Consultant for
23
each task shall not exceed the estimated amount for that task that is
24
set forth in Exhibit "A." Further, the total amount to be paid to
25
Consultant under this Amendment No. Two shall not exceed Three Hundred
26
Ninety -One Thousand Dollars and No Cents ($391,000.00).
27
SECTION 3: In all other respects, the terms and conditions
28
of the Agreement shall remain in full force and effect.
IN WITNESS WHEREOF, the parties have caused this Amendment
No. Two to be executed by and through their authorized officers on the
date, month and year first written above.
ATTEST:
BRUCE V. MALKENHORST, City Clerk
APPROVED AS TO FORM:
EDUARDO OLIVO, City Attorney
CITY OF VERNON
By:
LEONIS C. MALBURG, Mayor
PARSONS ENGINEERING SCIENCE, INC.
By:
Title:
By:
Title:
EXHIBIT A
Table 1
rnet F.ctimate
Task
Cost
1.
Preparation of revised traffic and transportation, biology, cultural
$35,000
resources, paleontology, socioeconomic, noise, and geologic hazards
sections to incorporate the impacts from the reclaimed water and
sewer pipeline in the Application for Certification (AFC).
2.
Multiple revisions of the air permit and air quality section of the
$75,000
AFC, including air dispersion modeling and health risk assessment
due to numerous changes in the Combustion Turbine Generator
design data (emission characteristics).
3.
Preparation of air quality cumulative analysis report
$15,000
4.
Provide support in obtaining air permit from the South Coast Air
$20,000
Quality Management District.
5.
Provide assistance in preparing CEMS Application for SCAQMD
$10,000
approval
6.
Provide assistance in developing source test protocol, obtaining
$10,000
SCAQMD's approval for the protocol, and coordinating the source
testing and preparation of the source test report.
7.
Provide assistance in obtaining acid rain credits (SOZ credit).
$4,000
8.
Provide assistance in obtaining emission (CO, PM10, and NOx
$5,000
credits.
9.
Data recovery, cultural resources awareness training, and
$10,000
completing the Native American Consultation.
10.
Develop community noise awareness program, noise monitoring
$20,000
after the plant startup and develop noise contours.
11.
Provide assistance in developing IIPP, emergency action plan, and
$20,000
facility fire prevention and protection plan.
12. Preparation of hazardous materials inventory and business plan.
$10,000
13. Preparation of California Accidental Release Prevention Program.
$25,000
14.
Develop waste management plan including the spill control and
$30,000
management procedures, prepare storm water pollution prevention
plan, prepare conditional exemption limiting permit, prepare
Industrial Waste Water Discharge Permit, obtain EPA ID Number
and register as a hazardous waste generator, and amendment of City
of Vernon hazardous materials establishment permit for Station "A"
GeneratingStation.
15. Identify principal faults (geological hazards) within 60 miles from
$2,000
the project site.
C:\DOCUMF-I\nbuegu.00ALS--1\TempAaddko-l.d[m
�FJT�Nufc3��
Table 1 (continued)
rnst F,stimate
. Task
Cost
16. Provide support in responding to California Energy Commission's
comments on the AFC. It is presumed that no new additional studies
will be required for the MGS.
$50,000
17. Project Management
$30,000
Total Labor Cost
$371,000
ODCs (travel, reproduction, and communication costs)
$20,000
TOTAL COST _1:::$391,000
C:OOCUME-1\nbwgVXALS--1\T-v\addk -l.d-
CITY COUNCIL
LEONIS C. MALBURG
Mayor
THOMAS A. YBARRA.
Mayor Pro-Tem
WM. "BILL" DAVIS
Councilman
H. "LARRY" GONZALES
Councilman
W. MICHAEL MCCORMICK
Councilman
BRUCE V. MALKENHORST
City Administrator/City Clerk
FAX (323) 826-1438
CITY HALL
4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058
TELEPHONE (323) 583-8811
February 6, 2002
Parsons Engineering Science,
Inc., Unit of Parsons
Infrastructure& Technology Group Inc.
100 West Walnut Street
Pasadena, CA 91124
EDUARDO OLIVO
City Attorney
FAX: (562) 869-1883
KEVIN WILSON
Director of Community Services & Water
FAX: (323) 826-1435
KENNETH J. DeDARIO
Director of Municipal Utilities
FAX: (323) 826-1425
Re: Amendment No. Two to the Agreement for Professional
Consulting Services
To Whom It May Concern:
STEVEN E. PARKER
Fire Chief
FAX: (323) 826-1407
BRUCE W. OLSON
Police Chief
FAX: (323) 826-1481
Transmitted herewith is a duplicate original copy of the above
referenced approved by the Vernon City Council on January 22,.2002.
If you have any questions regarding this matter, please call Mr. Ken
DeDario at (323) 583-8811 ext. 211.
Very truly yours,
el Giro
Assistant Chief Deputy City Clerk
NG:gm
cc: Ken DeDario
Agreement No. 02-003
Dolores Fonseca
CITY COUNCIL
LEONIS C. MALBURG
Mayor
THOMAS A. YBARRA
Mayor Pro-Tem
WM. 'BILL" DAVIS
Councilman
H. "LARRY" GONZALES
Councilman
W. MICHAEL MCCORMICK
Councilman
BRUCE V. MALKENHORST
City Administrator / City Clerk
FAX (323) 826-1438
City Council
City of Vernon
Honorable Members:
EDUARDO OLIVO
City Attorney
FAX: (562) 927-8722
KEVIN WILSON
Director of Community Services & Water
FAX: (323) 826-1435
KENNETH J. DeDARIO
Director of Municipal Utilities
FAX: (323) 826-1425
STEVEN E. PARKER
Fire Chief
FAX: (323) 826-1407
CITY HALL BRUCE W. OLSON
4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 Police Chief
TELEPHONE (323) 583-8811 FAX: (32(33))8826-1481
January 17, 2002 "V
The Director of Utilities is requesting that an amendment to the
existing agreement with Parsons Engineering Science, Inc., be approved
to include consulting services for the completion of the following
permit applications that are needed for the implementation of the
Malburg Generating Station Project:
• Application for Certification (AFC) for the California
Energy Commission (CEC).
• Permit to Construct for the South Coast Air Quality
Management District (SCAQMD)
These services will be provided at a cost not to exceed $391,000,00.
This has been reviewed by the City Attorney and it is hereby
recommended that the execution of an authorization for the additional
work be approved and ratified.
Very truly yours,
Bruce V. Malkenhorst
City Administrator/City Clerk
BVM/ng
January 16, 2002
TO: Bruce V. Malkenhorst, City Administrator
FROM: Kenneth J. DeDario, Director of Utilities
SUBJECT: Malburg Generating Station Project — Environmental
I recommend approval of the attached Amendment No. Two To The Agreement For Professional
Consulting Services By And Between The City of Vernon And Parsons Engineering Science,
Inc. for environmental permitting support for the Malburg Generating Station Project. This
Amendment provides for consultant services to complete the Application for Certification (AFC)
for the California Energy Commission (CEC) and the Permit to Construct for the South Coast
Air Quality Management District (SCAQMD). These services are for a not to exceed cost of
$391,000. This Amendment has been reviewed by the City Attorney.
I also recommend ratification of the January 14, 2002 execution of the Authorization For
Additional Work as described in Exhibit A of the attached.
If you have any questions or comments, please contact me. Thank you for your consideration.
KJD:ah
Attachment
WA F T"
-rwo
AMENDMENT NO OW TO THE AGREEMENT FOR
THIS AMENDMENT NO. ONE TO THE AGREEMENT FOR PROFESSIONAL
CONSULTING SERVICES is made, entered into and executed in duplicate
originals, either copy of which may be considered and used as the
original hereof for all purposes,.as of this day of September,
2001, in the City of Vernon, County of Los'Angeles, California
BY AND BETWEEN THE CITY OF VERNON
(hereinafter referred to as
the "City")
4305 Santa Fe Avenue
Vernon, CA 90058
AND PARSONS ENGINEERING SCIENCE,
INC., a Unit of Parsons
Infrastructure & Technology
Group Inc. (hereinafter
referred to as "Consultant")
100 W. Walnut Street
Pasadena, CA 91124
WHEREAS, the City and Consultant are parties to an Agreement
for Professional Services dated on or about June 20, 2001 (hereinafter
referred to as the "Agreement") in connection with the proposed Malburg
Generating Station Combined Cycle Power Plant (the "Project"); and
WHEREAS, circumstances have changed since the Agreementwas
executed; and
WHEREAS, the City desires -that the Project be considered under
the California Energy Commission's "Expedited Permit" six (6) month
permitting process in accordance with Section 25552 of the California
Public Resources Code; and
WHEREAS, City and Consultant.desire to amend the Agreement to
revise the scope of services and compensation provisions for the
preparation of.the Application for Certification ("AFC") for submission
to the California Energy Commission ("CEC") and a Permit to Construct
application for submission to the South Coast Air Quality Management
District ("SCAQMD") for the Project; and
WHEREAS, Section 6 of the Agreement allows for changes and
additions to the services to be 'performed by Consultant, the scope of
the Agreement and the adjustment of compensation and completion time
required thereof; and
WHEREAS, Section 11.G of the Agreement provides for
amendments and modifications to the Agreement.
NOW,, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET
FORTH HEREIN:
SECTION 1: Section 1 of the Agreement entitled SCOPE OF
SERVICES is hereby amended to read as follows:
Consultant shall perform the scope of services as detailed in
Exhibit "A" which is attached hereto and incorporated herein by
reference. In addition, Consultant will prepare and submit the
responses to requests for data adequacy by the CEC after the'AFC`for
the Project is submitted.
SECTION 2: Section 2 of the Agreement entitled PROGRESS
REPORTS is hereby amended to read as follows:
Consultant shall provide written progress reports, as
requested by the City, in order to advise the City, as quickly as
possible, of significant milestones or conclusions that will assist
the City in making progress toward the completion of the AFC and the
permitting process of the Project. Consultant shall also meet with
City staff, upon City's request, or as needed, in order to provide
reports or information concerning the services being performed by
Consultant under this Agreement.
2 _
SECTION 3: Section 3 of the Agreement entitled TIME OF
PERFORMANCE is hereby amended to read as follows:
Consultant's services shall commence upon complete execution
of the Agreement and shall continue until the Scope of Services as
provided for in Section l hereinabove are completed, unless the
Agreement is terminated.
SECTION 4: Section 4 of the Agreement entitled COMPENSATION
is hereby amended to read as follows:
A. Consulting Costs. The City will compensate
Consultant for assistance in the preparation of the AFC and the Permit
to Construct as part of the CEC Siting Process pursuant to
Consultant's cost estimate contained in Exhibit "A." The total amount
to be paid to.Consultant under this Agreement shall not exceed Two
Hundred Eighty -Three Thousand Five Hundred Dollars and No,.Cents
($283, 500.00)
B. Other Expenses. The Consulting Costs identified in
4A above include the "Other Direct Costs" which are identified "in
Exhibit "A." Any other expenses not identified in the Proposal ,may
only be billed if advance written approval has been obtained from the
City Administrator.
SECTION 5: In all other respects, the terms and conditions
of the Agreement shall be renewed in its entirety.
- 3 -
IN WITNESS WHEREOF, the parties have caused this Amendment to
be executed by and through their authorized officers on the date,
month and year first written above.
CITY OF VERNON
By:
THOMAS A. YBARRA, Mayor Pro Tem
ATTEST:
BRUCE V. MALKENHORST, City Clerk
APPROVED AS TO FORM:
EDUARDO OLIVO, City Attorney
PARSONS ENGINEERING SCIENCE, INC.
By:
Title:
By•
Title:
4 _
EXHIBIT A
Ramon Z. Abueg
January 7, 2002
Page 2
Table 1
Cost Estimate
Task
Cost
1. Preparation of revised traffic and transportation, biology, cultural
$35,000
resources, paleontology, socioeconomic, noise, and geologic hazards
sections to incorporate the impacts from the reclaimed water and
sewer pipeline in the Application for Certification (AFC).
2. Multiple revisions of the air permit and air quality section of the
$75,000
AFC, including air dispersion modeling and health risk assessment
due to numerous changes in the Combustion Turbine Generator
design data (emission characteristics).
3. ' Preparation of air quality cumulative analysis report
$15,000
4. Provide support in obtaining air permit from the South Coast Air
$20,000
Quality Management District.
5. Provide assistance in preparing CEMS Application for SCAQMD
$10,000
approval
6. Provide assistance in developing source test protocol, obtaining
$10,000
SCAQMD's approval for the protocol, and coordinating the source
testing and preparation of the source test report.
7. Provide assistance in obtaining acid rain credits (SO2 credit).
$4,000
8. Provide assistance in obtaining emission (CO, PMIo, and NOX)
$5,000
credits.
9. Data recovery, cultural resources awareness training, and
$10,000
completing the Native American Consultation.
10. Develop community noise awareness program, noise monitoring
$20,000
after the plant startup and develop noise contours.
11. Provide assistance in developing UPP, emergency action plan, and
$20,000
facility fire prevention and protection plan.
12. Preparation of hazardous materials inventory and business plan.
$10,000
13. Preparation of California Accidental Release Prevention Program.
$25,000
14. Develop waste management plan including the spill control and
$30,000
management procedures, prepare storm water pollution prevention
plan, prepare conditional exemption limiting permit, prepare
Industrial Waste Water Discharge Permit, obtain EPA ID Number
and register as a hazardous waste generator, and amendment of City
of Vernon hazardous materials establishment permit for Station "A"
Generating Station.
15. Identify principal faults (geological hazards) within 60 miles from
$2,000
the project site.
C:\DOCUMFrl\rabuegU XALS- I\TaWWdk -l.doc
Ramon Z. Abueg
i January 7, 2002
Page 3
Table 1 (continued)
Cost Estimate
Task
Cost
16. Provide support in responding to California Energy Commission's
comments on the AFC. It is presumed that no new additional studies
will be required for the MGS.
$50,000
17. Project Management
$30,000
Total Labor Cost
$371,000
ODCs (travel, reproduction, and communication costs)
$20,000
F- TOTAL COST
$3911000
C:\DOCUME-lkabuegV,OCALS-1\Temp\aMeo-l.doc