Resolution No. 8270.. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 8270 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT NO. ONE TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES BY AND BETWEEN THE CITY OF VERNON AND RRM DESIGN GROUP WHEREAS, on March 19, 2003, the City Council of the City of Vernon adopted Resolution No. 8170 approving and authorizing the execution of an Agreement For Professional Consulting Services (the "Agreement") with RRM Design Group ("RRM") for architectural and engineering services relating to the reconstruction of Vernon Fire Station No. 2 and the remodeling of the Police Department restrooms and locker rooms; and WHEREAS, the City desires to expand the existing scope of services with RRM to provide for additional work tasks and compensation for the remodeling of the locker and shower area in the Public Works building; and WHEREAS, in accordance with Sections VII and XI.8 of the Agreement, the City of Vernon and RRM desire to amend the Agreement to incorporate changes to the scope of services and the adjustment of compensation and completion time required therefor; and WHEREAS, by letter dated August 21, 2003, Bruce V. Malkenhorst, City Administrator/City Clerk, recommended that Amendment No. One to the existing Agreement with RRM be approved and executed. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE ,ITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby :finds and determines that the recitals contained hereinabove are true .. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 and correct. SECTION 2: The City Council of the City of Vernon hereby approves the Amendment No. One to the Agreement for Professional Consulting Services with RRM, a copy of which is attached hereto as Exhibit "A" and made a part hereof. SECTION 3: The City Council of the City of Vernon hereby authorizes the Mayor and the City Clerk to execute said Amendment for, and on behalf of, the City of Vernon. SECTION 4: The City Council of the City of Vernon hereby directs the City Clerk, or his designee, to send one fully executed Amendment to: RRM Design Group Attn: Mary Mcgrath, Senior Vice President 3765 S. Higuera Street, Suite 102 San Luis Obispo, CA 93401 SECTION 5: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 16th day of July, 2003. ATTEST: BRUCE V. MALKENHORST, City Clerk- L ONIS C. MALBUR Mayor - 2 - i 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 8270, was duly adopted,by the City Council of the City of Vernon at an adjourned regular meeting of the City Council duly held on Wednesday, August 27, 2003, and thereafter was duly signed by the Mayor of the City of Vernon. ( SEAL ) BRUCE V. MALKENHORST, City Clerk 3 - EXHIBIT Is 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 .AMENDMENT NO. ONE TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES FIRE STATION NO. 2 REPLACEMENT AND POLICE DEPARTMENT REMODELING THIS AMENDMENT NO. ONE TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES (FIRE STATION NO. 2 REPLACEMENT AND POLICE DEPARTMENT REMODELING).is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this day of August, 2003. BY AND BETWEEN THE CITY OF VERNON, a municipal corporation (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, California 90058 AND RRM DESIGN GROUP (hereinafter referred to as "Consultant") 3765 S. Higuera Street, Suite 102 San Luis Obispo, CA 93401 RECITALS WHEREAS, the City and Consultant are parties to an Agreement for Professional Consulting Services dated on or about March 19, 2003 (hereinafter referred to as the "Agreement") for architectural and engineering services relating to the reconstruction of Vernon Fire Station No. 2 and the remodeling of the Police Department restrooms and locker rooms; and WHEREAS, the City and Consultant desire to amend the Agreement to provide for additional work tasks and compensation for the remodeling of locker and shower area in .the Public Works building.; and WHEREAS, Section VII of the Agreement allows for changes and additions to the services to be performed by Consultant, the scope of the Agreement and the adjustment of compensation and completion time 1 2 3 4 5 6 71 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 required thereof; and WHEREAS, Section XI.8 of the Agreement provides for amendments and modifications to the Agreement. NOW, THEREFORE, IN CONSIDERATION OF THESE MUTUAL COVENANTS, THE PARTIES HERETO AGREE AS FOLLOWS: SECTION 1: In addition to the services outlined in the SCOPE OF SERVICES section of the Agreement, Consultant shall perform the remodeling services for locker and shower area in the Public Works building as detailed in the June 6, 2003 Proposal, a*copy of which is attached hereto as Exhibit "A-1" and incorporated -herein by reference. The tasks in the June 6, 2003 Proposal include:.Task PW-1, orientation meeting;"Task PW-2, verification of existing conditions; and Task PW-3, construction documents/bidding construction administration. All such work tasks undertaken by Consultant shall be on an as -needed basis and shall be completed at the direction of the City. Services not included. in the June 6, 2003 Proposal are: in depth generation of "As -Built" plans; hazardous materials testing, reports or recommendations for removal; design, specification and/or purchasing of furnishings and specialty equipment such as phone equipment, alarm systems, data systems, security systems and similar owner -purchased items; surveying or topographic map; utility investigation beyond those readily accessible from manholes, etc.; meetings not specifically listed; and construction.management. SECTION 2: In addition to the compensation to be paid to Consultant outlined in the COMPENSATION section of the Agreement, the City will pay Consultant for the remodeling of the Public Works building locker and shower area under this Amendment No. One a sum not to exceed Fifty -Three Thousand One Hundred Dollars and No Cents - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ($53,100.00), including reimbursable and reproduction expenses as identified in Exhibit B-3 of the Agreement. Consultant shall be paid in accordance with the Per Task Fee Schedule which is attached hereto as Exhibit B-4 and incorporated herein by this reference as though fully set forth at length. If changes or extra services are requested by the City pursuant to Section 6 of the Agreement, then the City shall pay for those services on either an agreed upon price or on a time -and - material basis according to the hourly rate identified in Exhibit B-2 of the Agreement. SECTION 3: The City will pay Consultant for work .done on the Public Works building on a time -and -materials basis according to the hourly rates set forth in Exhibit B-2 of the Agreement. Any other expenses for work done on the Public Works building not identified in the Amendment No. One may only be billed if advance written approval has been obtained from the City Administrator. SECTION 4: In all other respects, the terms and conditions of the Agreement shall be renewed in its entirety. - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, City and Consultant have executed this Amendment as of the date first hereinabove set forth. ATTEST: BRUCE V. MALKENHORST, City Clerk APPROVED AS TO FORM: EDUARDO OLIVO, City Attorney CITY OF VERNON By: LEONIS C. MALBURGi'Mayor �Rj�R,M DESIGN GROUP By: V'L Name: G' Title: Y V10, PV-4Sjdwt By: Name: Title: Cpv�Gy - 4 - EXHIBIT A-1 CITY OF VERNON Fire Station No. 2 Replacement and Police Department Bathrooms/Locker Room Remodel Public Works Locker/Shower Remodel June 6, 2003 PUBLIC WORKS LOCKER/SHOWER REMODEL PROJECT UNDERSTANDING The City of Vernon Public.Works Department wishes to completely remodel their existing locker and shower room and include the addition of a women's locker and shower area. Included in the scope of work is the replacement of the existing kitchenette including replacement of cabinets, plumbing fixtures and range oven/microwave, new floor coverings in all spaces of Locker/Shower Room building (2 .offices, lobby, kitchenette/lunch room, pump room and mechanical room), paint all existing buildings exteriors (5 buildings total). Paint all interior spaces of Locker/Shower Room building and remove and replace existing storefront along west side of the building. The south-west door at the pump room in the Locker/Shower building shall be removed and the opening sealed off. Existing finishes, fixtures, lightiq& and HVAC are to be completely removed from the locker/shower areas and replaced with new finishes, fixtures, lighting; and HVAC. Existing walls are to be removed for the layout of new walls in some spaces. Existing finishes in all other areas are to be removed and replaced. SCOPE OF WORK AND TASKS Task PW-L• Orientation Meeting Approach: Orientation meeting to establish the goals and procedures for the remodel of the restrooms/locker rooms/kitchenette and yard buildings exterior refinish. This meeting is envisioned to include the Design Team, City Management, and the Public Works Management At this meeting; we will determine the lines of project team communication, overall goals for the remodel as it pertains to budget, schedule, and operational goals. In addition, operational constraints during the renovations will be determined. An agenda will be used to provide consistency of topics among all stations. Meeting will be carefully facilitated to focus on discussions relating to finishes, fixtures, schedule, and budget Products: Meeting Notes Meetings: One (1) meeting Schedule-, One (1) week Task PW 2: Verification of Existing Conditions Approach: As -Built. Verificadon Survey/Facility Assessment to identify and quantify the existing facilities and conditions for each space. This phase is based on the premise that existing drawings of each space exist and that we will be verifying information as opposed to creating as -built plans. We will also arrange meetings with the City's Building Department to review key code issues prior to beginning design. Each space will be measured, photographed, and inspected to determine the existing condition of the space. This informadon will be used RRM DESIGN GROUP Page 1 of 2 CITY OF VERNON Fire Station No. 2 Replacement and Police Department Bathrooms/Locker Room Remodel Public Works Locker/Shower Remodel June 6, 2003 to create the "as -built" plans of the buildings. These plans will be used as a base -set of plans for. the proposed remodel. These plans will focus on the areas to be effected by the remodel and will only confirm the spaces involved in, this project We will meet with the Building Department to review requirements prior to beginning design. Products: Plan, Elevation, and Reflected Ceiling drawings of the existing spaces in AutoCAD format Meetings: One (1) to arrange access to spaces for surveying Schedule: Two (2) weeks Task PW-3: Construction Documents/Bidding/Construction Administration Approach: With the scope of the remodel for each space fi&y known, and the existing conditions confirmed, materials and fixtures selections, construction documents and specifications will be developed for use in Bidding and Construction of the remodels. Construction Administration services will also be provided during the construction phase of each project We anticipate attending three (3) meetings during Construction Documentation as follows: one (1) meeting at the kickoff of construction documentation, one (1) meeting at the mid -point of construction documentation, and one (1) meeting to present the construction drawings for review and plan check. We anticipate attending three (3) meetings during Construction Administration as follows: one (1) meeting at the kickoff of construction, one (1) meeting three weeks after beginning of construction, and one (1) meeting to prepare a "punch list" for the spaces when substantially complete. Products: • Facility, remodel construction documents, specifications, and calculations • RRM will provide technical specifications and will edit City's specifications Divisions 0 and 1 for bidding. • Final Cost Estimate • Interior finish selections will be presented for approval by City. • Temporary Facilities Plan for use during the construction of the project Meetings: Three (3) meetings during Construction Documents to review finishes/fixtures/plans Three (3) meetings during Construction Administration Schedule: Five (5) weeks (not including Construction period) v/100M\pmp=ANcw Bldg F m Station-Polim-Swpe do T2sks-OLK03 RRM DESIGN GROUP Page 2 of 2 EXHIBIT B-4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22� 23 24 25 26 27 28 EXHIBIT B-4 PUBLIC WORKS LOCKER/SHOWER REMODELING PER TASK FEE SCHEDULE ARCHITECTURE AND ENGINEERING FEE SUMMARY TASK FEE 1N0�g -,.... ..... -------- EM-- PUBLIC WORKS REMODEL BASIC SERVICES Task PW-1 - Orientation Meeting 1,438.00 Task PW-2 - Verification of Existing $ 6,250.00 Conditions Task PW-3 - Construction Documents/ $ 41,412.00 Bidding Construction Administration TOTAL BASIC SERVICES $ 49,100.00 4 1-0 PUBLIC WORKS REMODEL REIMBURSABLES Public Works Reimbursable Budget $ 4,000.00 EKE BEER M= 1: 1-101110=0 NINE, 0, X. XEN.". g TOTAL FEE FOR BASIC SERVICES AND $ 53,100.00 REIMBURSABLES FOR ALL PHASES EXHIBIT B-4 SUPPORTING DOCUMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AMENDMENT NO. ONE TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES (FIRE STATION NO. 2 REPLACEMENT AND POLICE DEPARTMENT REMODELING THIS AMENDMENT NO. ONE TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES (FIRE STATION NO. 2 REPLACEMENT AND POLICE DEPARTMENT REMODELING) is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this '� day of Aa4ust, 2003. BY AND BETWEEN THE CITY OF VERNON, a municipal corporation (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, California 90058 RRM DESIGN GROUP (hereinafter referred to as "Consultant") 3765 S. Higuera Street, Suite 102 San Luis Obispo, CA 93401 RECITALS WHEREAS, the City and Consultant are parties to an Agreement for Professional Consulting Services dated on or about March 19, 2003 (hereinafter referred to as the "Agreement") for architectural and engineering services relating to the reconstruction of Vernon Fire Station No. 2 and the remodeling of the Police Department restrooms and locker rooms; and WHEREAS, the City and Consultant desire to amend the Agreement to provide for additional work tasks and compensation for the remodeling of locker and shower area in the Public Works building; and WHEREAS, Section VII of the Agreement allows for changes and additions to the services to be performed by Consultant, the scope of the Agreement and the adjustment of compensation and completion time 1 2 3 4 5 6 FM 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11required thereof; and WHEREAS, Section XI.8 of the Agreement provides for amendments and modifications to the Agreement. NOW, THEREFORE, IN CONSIDERATION OF THESE MUTUAL COVENANTS, THE PARTIES HERETO AGREE AS FOLLOWS: SECTION 1: In addition to the services outlined in the SCOPE OF SERVICES section of the Agreement, Consultant shall perform the remodeling services for locker and shower area in the Public Works building as detailed in the June 6, 2003 Proposal, a copy of which is attached hereto as Exhibit "A-1" and incorporated herein by reference. The tasks in the June 6, 2003 Proposal include: Task PW-1, orientation meeting; Task PW-2, verification of existing conditions; and Task PW-3, construction documents/bidding construction administration. All such work tasks undertaken by Consultant shall be on an as -needed basis and shall be completed at the direction of the'City. Services not included in the June 6, 2003 Proposal are: in depth generation of "As -Built" plans; hazardous materials testing, reports or recommendations for removal; design, specification and/or purchasing of furnishings and specialty equipment such as phone equipment, alarm systems, data systems, security systems and similar owner -purchased items; surveying or topographic map; utility investigation beyond those readily accessible from manholes, etc.; meetings not specifically listed; and 1construction management. SECTION 2: In addition to the compensation to be paid to Consultant outlined in the COMPENSATION section of the Agreement,, the City will pay Consultant for the remodeling of the Public Works building locker and shower area under this Amendment No. One a sum not Ito exceed Fifty -Three Thousand One Hundred Dollars and No Cents - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 ($53,100.00), including reimbursable and reproduction expenses as identified in Exhibit B-3 of the Agreement. Consultant shall be paid in accordance with the Per Task Fee Schedule which is attached hereto as Exhibit B-4 and incorporated herein by this reference as though fully set forth at length. If changes or extra services are requested by the City pursuant to Section 6 of the Agreement, then the City shall pay for those services on either an agreed upon price or on a time -and - material basis according to the hourly rate identified in Exhibit B-2 of the Agreement. SECTION 3: The City will pay Consultant for work done on the Public Works building on a time -and -materials basis according to the hourly rates set forth in Exhibit B-2 of the Agreement. Any other expenses for work done on the Public Works building not identified in the Amendment No. One may only be billed if advance written approval has been obtained from the City Administrator. SECTION 4: In all other respects, the terms and conditions of the Agreement shall be renewed in its entirety. - 3 - 1 2 3 4 5 6 7 8 9 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, City and Consultant have executed this Amendment as of the date first hereinabove set forth. ATTES f v BRUCE V. MALKENHORST, City Clerk APPROVED AS TO FORM: EDUARDO OLIVO, City Attorney CITY OF VERNON By: t ONIS C. MALBUR Mayo R/R�M DESIGN GROUP By: Name • L• Title: Y t Y•t By: Ll Name: f/� .���✓� Title: C�v�GJo - 4 - EXHIBIT A-1 CITY OF VERNON Fire Station No: 2 Replacement and Police Department Bathrooms/Locker Room Remodel Public Works Locker/Shower Remodel June 6, 2003 PUBLIC WORKS LOCKER/SHOWER REMODEL PROJECT UNDERSTANDING The City of Vernon Public Works Department wishes to completely remodel their existing locker and shower room and include the addition of a women's locker and shower area. Included in the scope of work is the replacement of the existing kitchenette including replacement of cabinets, plumbing fixtures and range oven/microwave, new floor coverings in all spaces of Locker/Shower Room building (2 offices, lobby, kitchenette/lunch room, pump room and mechanical room), paint all existing buildings exteriors (5 buildings total). Paint all interior spaces of Locker/Shower Room building and remove and replace existing storefront along west side of the building. The south-west door at the pump room in the Locker/Shower building shall be removed and the opening sealed off. Existing finishes, fixtures, lighting, and HVAC are to be completely removed from the locker/shower areas and replaced with new finishes, fixtures, lighting, and HVAC. Existing walls are to be removed for the layout of new walls in some spaces. Existing finishes in all other areas are to be removed and replaced. SCOPE OF WORK AND TASKS Task PW-L• Orientation Meeti ff Approach: Orientation meeting to establish the goals and procedures for the remodel of the resttooms/locker rooms/kitchenette and yard buildings exterior refinish. This meeting is envisioned to include the Design Team, City Management, and the Public Works Management. At this meeting, we will determine the lines of Project team communication, overall goals for the remodel as it pertains to budget, schedule, and operational goals. In addition, operational constraints during the renovations will be determined. An agenda will be used to provide consistency of topics among all stations. Meeting will be carefully facilitated to focus on discussions relating to finishes, fixtures, schedule, and budget Products: Meeting Notes Meetings: One (1) meeting Schedule:. One (1) week Task PW--2: Verification of Existing Conditions Approach: As -Built Verification Survey/Facility Assessment to identify and quantify the existing facilities and conditions for each space. This phase is based on the premise that existing drawings of each space exist and that we will be verifying information as opposed to creating as -built plans. We will also arrange meetings with the City's Building Department to review key code issues prior to beginning design. Each space will be measured, photographed, and inspected to determine the existing condition of the space. This information will be used RRM DESIGN GROUP Page 1 of 2 CITY OF VERNON Fire Station No. 2 Replacement and Police Department Bathrooms/Locker Room Remodel Public Works Locker/Shower Remodel June 6, 2003 to create the "as -built" plans of the buildings. These plans will be used as a base set of plans for. the proposed remodel. These plans will focus on the areas to be effected by the remodel and will only confirm the spaces involved in this project. We will meet with the Building Department to review requirements prior to beginning design. Products: Plan, Elevation, and Reflected Ceiling drawings of the existing spaces in AutoCAD format Meetings: One (1) to arrange access to spaces for surveying Schedule: Two (2) weeks Task PW-3: Construction Documents/Biddin /Construction Administration Approach: With the scope of the remodel for each space fully known, and the existing conditions confirmed, materials and fixtures selections, construction documents and specifications will be developed for use in Bidding and Construction of the remodels. Construction Administration services will also be provided during the construction phase of each project. We anticipate attending three (3) meetings during Construction Documentation as follows: one (1) meeting at the kickoff of construction documentation, one (1) meeting at the mid -point of construction documentation, and one (1) meeting to present the construction drawings for review and plan check. We anticipate attending three (3) meetings during Construction Administration as follows: one (1) meeting at the kickoff of construction, one (1) meeting three weeks after beginning of construction, and one (1) meeting to prepare a "punch list" for the spaces when substantially complete. Products: • Facility remodel construction documents, specifications, and calculations • RRM will provide technical specifications and will edit City's specifications Divisions 0 and 1 for bidding. • Final Cost Estimate • Interior finish selections will be presented for approval by City. • Temporary Facilities Plan for use during the construction of the project Meetings: Three (3) meetings during Construction Documents to review finishes/fixtures/plans Three (3) meetings during Construction Administration Schedule: Five (5) weeks (not including Construction period) v/1002502\proposal\New Bldg Fire Station-Polico-Scope & T2sks-01.08.03 RRM DESIGN GROUP Page 2 of 2 EXHIBIT B-4 1 2 3 4 5 6 7, 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 EXHIBIT B-4 PUBLIC WORKS LOCKER/SHOWER REMODELING PER TASK FEE SCHEDULE ARCHITECTURE AND ENGINEERING FEE SUMMARY TASK FEE PUBLIC WORKS REMODEL BASIC SERVICES Task PW-1 - Orientation Meeting $ 1,438.00' Task PW-2 - Verification of Existing $ 6,250.00 Conditions Task PW-3 - Construction Documents/ $ 41,412.00 Bidding Construction Administration TOTAL BASIC SERVICES $ 49,100.00 PUBLIC WORKS REMODEL REIMBURSABLES Public Works Reimbursable Budget $ 4,000.00 :.::.:.::..:.:::::::..::::..::::.:::::.::::::::.:::::::::::.::::::::::::::::::............ TOTAL FEE FOR BASIC SERVICES AND $ 53,100.00 REIMBURSABLES FOR ALL PHASES EXHIBIT B-4 CITY OF VERNON COMMUNITY SERVICES DEPARTMENT AGREEMENT EXTRA ORDER NO. 5 SUPPLEMENT NO. SHEET 1 OF I SHEETS PROJECT: Professional Consulting Services Agreement P.O. NO. 369 TO: RRM Design Group CONTRACTOR REQUESTED BY: City You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the nlans and specifications on this contract. EXTRA WORK AT AGREED PRICE The City of Vernon herein approves the addition of fees according to your proposal dated_ January 4, 2007 for additional work to be performed as follows: Provide consultant services for construction according to the original agreement from January 4, 2007 through March 30, 2007 at a total cost of twelve thousand dollars ($12,000.00). No other adjustment of compensation will be allowed for this change. Contract Amount (Base Bid) $ 304,740.00 Amount of This Change Order ....... ... $ 12,000.00 Amount of Previous Change Orders $ 52 310.00 Total Amount of Change Orders $ 64,310.00 Modified Contract Amount ... ............ $ 369,050.00 By reason of this order the time of NO d nt completion will be adjusted as follows: Approved: Date: z • 13-07 ector of Co unity Services & Water We, the undersigned Consultant, have given careful consideration to the change proposed and hereby agree, if this proposal is approved that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. -o�wAccepted: Date: Consultant: By:' -�J�� ��Y�— Title: ) 4 . t 1 l ) RRM Design Group 31831 Camino Capistrano, Ste. 200 San Juan Capistrano, CA 92675 P: (949) 488-0933 F: (949) 488-0316 www.rrmdesign.com f Dear Woody: January 4, 2007 Woody Natsuhara City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Re: Additional Services rbi P ctr tir en�rlt ref � WON" Below please find our formal request for Additional Services for the Vernon Fire Station No. 2, Police Department and Public Works Remodel projects. Currently the proposed construction length is scheduled to go through the month of March. This is over the original 12 months scheduled for construction administration services. Therefore we are requesting additional compensation to cover the costs associated with the extended construction length in the following amount: • Additional Construction Administration (to be billed as Task FS-5.3): $12,000 The additional construction administration support will start in January and run through March. If you have any questions please feel free to contact me. Sincerely, RRM DESIGN GROUP Don Iler Manager, Public Safety Services RAM/alw Authorized Client Representative COMMUNITY PUBLIC SAFETY I RECREATION I EDUCATION I URBAN ARCHITECTS I ENGINEERS I LANDSCAPE ARCHITECTS I PLANNERS I SURVEYORS A California Corporation I Victor Mantgemery, ArchitectIC11090 I Jerry Michael, PE 136895, LS 162761 Jeff Ferber, LA I2844 °Fv��'L RECEIVED FEB - 6 20071 Community Services COMMUNITY SERVICES & WATER DEPARTMENT OFFICE MEMORANDUM TO: Eric Fresch, Acting City Administrator FROM: Samuel Kevin Wilson; llirector of Community Services & Water DATE: January 11, 2007 SUBJECT: Fire Station No. 2 Replacement, Police Department and Public Works Building Remodel — RRM Design Group — Contract Change Order No. 5 The construction of the Fire Station No. 2 and Police Building Remodel portions of Contract No. 582 will be extended due to additional time allotted to the contractor for extra work and allowable delay days. It is estimated that the project will extend into March 2007 and the services of the design firm, RRM Design Group will be required for the review and clarification of the plans and specifications. RRM Design Group requests an additional $12,000.00 for the three month extension of time. The cost has been verified as the cost that will be expended by the consultant to complete the review, clarification of the plans and close out of this project. I recommend that we approve Change Order No. 5 to the contract of RRM Design Group for this work. Please approve and schedule for City Council approval. SKW/sn Enclosure 09- o-7°Z CITY OF VERNON`�� COMMUNITY SERVICES DEPARTMENT AGREEMENT EXTRA ORDER NO. 6 SUPPLEMENT NO. SHEET 1 OF I SHEETS PROJECT: Professional Consulting Services Agreement P.O. NO. 369 TO: RRM Design Group CONTRACTOR REQUESTED BY: City You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not Included in the nlnns nnrl cnarifwnt;nne nn th;� ,try EXTRA WORK AT AGREED PRICE The City of Vernon herein approves the addition of fees according to your proposal dated March 15, 2007 for additional work to be performed as follows: Architectural work for the remodel of City Hall offices on the 3rd floor as outlined on the proposal dated March 15, 2007 for a cost of $55,120 plus a not to exceed $8,000 for reimbursables totaling $63,120 Contract Amount (Base Bid) .. $ 304,740.00 Amount of This Change Order .... .. . .. . ....... $ 63,120.00 Amount of Previous Change Orders $ 64,310.00 Total Amount of Change Orders ............................... $ 127,430.00 Modified Contract Amount .. $ 432,170.00 By reason of this order the time of completion will be adjusted as follows: Approved: Date: Zd:g -!�7 D4jir'MVri y Services & Water We, the undersigned Consultant, have given careful consideration to the change proposed and hereby agree, if this proposal is approved that we will provide all labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted: Date: Consultant: '0�0 By: Title: l /lC t City of Vernon CITY HALL 3RD FLOOR OFFICE REMODEL March 15, 2007 R3 FiS h� A' PROJECT UNDERSTANDING The City of Vernon wishes to remodel the third floor of their City Hall offices to consolidate their Light and Power divisions which will include light office storage, private offices, open office space and evaluation and recommendations on existing HVAC and electrical power requirements at the third floor. Included in the scope of work is design/specifications for new finishes (carpet, base, paint, ceiling grids and tiles), light fixtures, electrical and HVAC reconfiguration. The reuse of (E)HVAC units will be a goal for the remodel. SCOPE OF WORK AND TASKS PLANNING PHASE TASK A: Orientation Meeting/Schematic Design Approach: Meet with City personnel to determine project goals, constraints and develop/verify space planning based on City of Vernon goals, and produce a conceptual floor plan. Three sub -tasks are anticipated for Task A as follows: Task A.1: Orientation and Programming Orientation meeting to establish the goals and procedures for the remodel of the third floor of the City Hall office spaces and requirements. This meeting is envisioned to include the Design Team, City Management, and pertinent City of Vernon staff. At this meeting, we will determine the lines of project team communication, overall goals for the remodel as it pertains to budget, schedule, and operational goals. In addition, operational constraints during the renovations will be determined. Meeting will be carefully -facilitated to focus on discussions relating to space planning, finishes, fixtures, schedule, and budget. Task A.2: Verification and (E) Base Drawings Verification Survey/Facility Assessment to identify and quantify the existing facilities and conditions for each space, Drawings are not available in CAD and will be generated by RRM based on existing drawings provided by the City; we will be generally verifying information as opposed to creating as -built plans. Each space will be photographed and inspected to determine the existing condition of the space. Structural columns and exterior perimeter walls will be field verified for locations only; all other interior walls will be visuallylinspected for general conformance to City provided as -built drawings. Task A.3: Conceptual Design This phase will incorporate review comments from previous sub tasks into the drawings to, create a basis for start of Construction Documents. This information along with CAD drawings prepared previously will be used to create the existing and demolition plans of the space. These plans will be used as a base set of plans for the proposed remodel. These plans will focus on Page I of 2 creating environments people enjoy"" the areas to be affected by the remodel and will only confirm the spaces involved in this project. Products: Floor Plans, (E) and Revised Floor Plans Meetings: Three (3) meetings Schedule: Three (3) weeks DESIGN PHASE TASK B: Construction Documents Approach: With the scope of the remodel for each space fully known, and the existing conditions confirmed, materials and fixtures selections, construction documents and specifications will be developed along with Building Department approvals for use in Bidding and Construction of the remodel It is anticipated that the design team will respond to plan check comments generated out of first plan check. Any additional comments beyond first plan check comments will be billed on an hourly basis. Products: Facility remodel construction documents, specifications and calculations • RRM will provide technical specifications and will edit City's specifications Divisions 0 and,1 for bidding. • Provide conceptual opinion of probable construction cost • Interior finishes to match existing • 90% plans and specifications for Building Department submittal • 100% plans and specifications for Bidding and Construction addressing comments from the Building Department. Meetings: None Schedule: Four (4) weeks CONSTRUCTION PHASE TASK C: Bidding/Construction Administration Approach: Construction Administration and Bid Negotiating assistance services will be provided during the construction and bidding of the project. We anticipate attending six (6) meetings during this phase as follows: one (1) meeting at pre -bid conference, one (1) meeting at the kickoff of construction, three (3) meetings during the course of construction and one (1) meeting to prepare a 'punch list' for the remodeled spaces when substantially complete. It is anticipated that construction will last six (6) months. This phase will be billed as an hourly not -to -exceed rate as shown on the attached Fee Summary page. Products: RFI's, Addendums, Shop Drawing Review, Substantial Completion Documentation, Punch List Meetings: Six (6) meetings for Construction Observation and kick-off meeting, Bidding and project punch list. Schedule: Estimated six (6) months for construction rrm11-4 "A e S 'group IN creating Page 2 of 2 r_ g p g environments people enjoy" 'i f ya_ City of Vernon CITY HALL 3RD FLOOR OFFICE REMODEL s �l March 15, 2007 COST SUMMARY FOR BASIC SERVICES TASKS FEES Planning Services Task A.1 Orientation and Programming $ 3,120 Task A.2 Site Review and Demolition Base $ 7,560 Drawings Task A.3 Conceptual Design $ 5,840 Design and Construction Services Task B Construction Documents r _ $ 26,100 Task C Construction Administration $ 12,500 (Hourly) Basic Services Fee Subtotal (Tasks A-C): *$ 55,120 *Not including reimbursables. Reimbursable budget to be $8,000. RRM Design Group reimbursable expenses shall include photocopies at $.20 per copy. All other types of RRM Design Group reproductions such as blueprinting, process camera, typesetting, mileage and printing shall be billed at the local vendor's current rate plus 10% to cover our overhead and administrative expenses. Page I of 1 rrm. r ; t . group creating environments people enjoy"' RRM Design Group Principal $125 to $225 Manager (Work Group or Market Sector) $120 to $160 Principal Planner, Project Manager, Principal Landscape Architect, Surveying Supervisor $1 00to $140 Senior Architect, Sr. Designer, Sr. Construction Administrator, Sr. Landscape Architect, Sr. Planner, ,Sr., Civil Designer, Sr. Engineer, Sr. Party Chief, Sr. Land Surveyor $80 to $120 Architect, Landscape Architect, Licensed Engineer tnW-31.10 ,Job Captain, Associate Planner, Associate Landscape Architect, Civil Designer, Engineer, Survey Tech 111 $65 to $105 Designer, Planning Asst.,.Landscape Architecture Asst. CAD Designer Ili Survey Tech .11 $55:049.5 Intern, CAD Designer 1, Survey Tech 1, Support Staff $45 to $75 rrmJNOR ' -group creating w IronmgUs APPRO'VEO MAR 19 '07 CITY COUNCIL COMMUNITY SERVICES & WATER DEPARTMENT OFFICE MEMORANDUM TO: Eric Fresch, Acting City Administrator FROM: Samuel Kevin Wilson, Director of Community Services & Wa DATE: March 13, 2007 SUBJECT: 3rd FLOOR REMODEL As you are aware the City is proposing to remodel the 3Td floor of the City Hall building to consolidate the Light & Power Department into one office area. In order to commence reconstruction plans and specifications must be prepared outlining the work to be performed including but not limited to space planning, design of new finishes, and reconfiguration of lighting, electrical and HVAC systems. The City is currently under contract with the architectural firm, RRM Design Group, for the reconstruction of Fire Station No. 2. They also designed a small office remodel on the 2nd floor on behalf of the City. This firm has a working knowledge of the City requirements and is capable of performing the work in a qualitative manner. Enclosed herewith is a proposal for the architectural work including project administration. It is my recommendation that RRM Design Group be retained to prepare the contract drawings and construction administration as outlined in the proposal dated March 8, 2007 and that a Change Order be issued to RRM Design Group in the amount of $63,120 of which $8,000 is for reimbursable expenditures. SKW/ca Enclosure c: Nelly Giron Judy Lehr You are hereby directed to make the herein described changes from the plans and soecifications or do the followine descrihe.d work not included in the plans; and specifications on this contract EXTRA WORK AT AGREED PRICE The City of Vernon herein approves the addition of fees according to your proposal dated April 13, 2007 for additional work to be performed as follows: Additional construction review and consultation through the end of the project on a time and material basis for a cost not to exceed $5,500.00 Contract Amount (Base Bid) $ 304,740.00 Amount of This Change Order $ 5,500.00 Amount of Previous Change Orders $ 127,430.00 Total Amount of Change Orders $ 132,930.00 Modified Contract Amount $ 437, 70.00 By reason of this order the time of completion will be adjusted as follows; Approved: Date: 2-3 - j 7 of ommunity services & Water 'J"/ We, the undersigned Consultant, have given careful consideration to the change proposed and hereby agree, if this proposal is approved that we will provide all labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted: Date: 0"1 Consultant:_ By: Title: X k OF VERB °ice II <.eo o ei SI'f LY INOJ`' COMMUNITY SERVICES & WATER DEPARTMENT OFFICE MEMORANDUM TO: Eric Fresch, Acting City Administrator FROM: Samuel Kevin Wilson, Director of Community Services & Water DATE: April 24, 2007 SUBJECT: Fire Station No. 2 Replacement, Police Department and Public Works Building Remodel - Contract No. 582— RRM Design Group Change Order No. 7 — Construction Review and Consultation The project has been extended by the addition of more work for the contractor beyond the original completion date. In order for the work to be completed in accordance with the plans and specifications, the architect, RRM Design Group will need to be consulted. RRM Design Group has proposed a time and materials extension not to exceed $5,500.00 for the balance of the contract time. I have authorized this work. The change order is enclosed for your records. SKW/sn Enclosures