RESOLUTION NO. 8294
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON AMENDING RATE SCHEDULES D, GS-1, GS-2, LS-1,
LS-2, OL-1, PA-1, PA-2, PA-TOU, TC-1, TOU-G AND
TOU-V REGARDING ELECTRICAL RATES TO BE CHARGED FOR
ELECTRICAL ENERGY DISTRIBUTED AND SUPPLIED BY THE
CITY WITHIN ITS BOUNDARIES
WHEREAS, the City Council of the City of Vernon adopted
Ordinance No. 1030 on May 16, 1995, providing that rates to be charged
for electrical energy distributed and supplied by the City within its
boundaries shall be set by resolution; and
WHEREAS, on April 18, 2001, the City Council of the City of
Vernon adopted Resolution No., 7747, which amended Rate Schedules D, GS-
1, GS-2, LS-1, LS-2, OL-1, PA-1, PA-2, PA-TOU, TC-1, TOU-G and TOU-V;
and
WHEREAS, on October 3, 2001, the City Council of the City of
Vernon adopted Resolution No. 7841, which amended Rate Schedule TOU=G;
and
WHEREAS, on September 17, 2003, the Finance Committee
considered the recommendation of Bruce V. Malkenhorst, the Director of
Finance, dated September 11, 2003, to approve a 3% increase in the
electric rates for customers in order to offset the increase in the
City's operating costs and the incremental costs associated with
capital improvements to the electric system; and
WHEREAS, the proposed electric rates are to be effective on
November 1, 2003.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
a 1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The City Council of the City of Vernon hereby
adopts Rate Schedules D, GS-1, GS-2, LS-1, LS-2, OL-1, PA-1, PA-2, PA
TOU, TC-1, TOU-G and TOU-V as the City's rates for the distribution of
electrical energy supplied by the City for certain classes of service
to be effective November 1, 2003, copies of which are attached hereto
as Exhibit "A" and made a part hereof.
SECTION 3: Any provisions contained in Resolution Nos.
7689, 7638, 7557, 7248, 7062, 7747 and 7841 not consistent with or in
conflict with this resolution are hereby repealed. In all other
respects, Resolution Nos. 7689, 7638, 7557, 7248, 7062, 7747 and 7841
shall remain in full force and effect.
SECTION 4: The City Clerk of the City of Vernon shall
certify to the passage of this resolution, and thereupon and
thereafter the same shall be in full force and effect.
APPROVED AND ADOPTED this 15th day of October, 2003.
ATTEST:
v
BRUCE V. MALKENHORST, City Clerk
EONIS C. MALB RG, Ma or
- 2 -
STATE OF CALIFORNIA )
ss
COUNTY OF LOS ANGELES )
I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution No.
8294, was duly adopted by the City Council of the City of Vernon at a
regular meeting of the City Council duly held on Wednesday, October 15,
2003, and thereafter was duly signed by the Mayor of the City of
Vernon.
Q..
(SEAL)
BRUCE V. MALKENHORST, City Clerk
- 3 -
EXHIBIT
0
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. D
DOMESTIC SERVICE
APPLICABILITY
Applicable to domestic service including lighting, heating, cooking and power or combination thereof
in a single-family accommodation.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Customer Charge ..........................
Energy Charge (to be added to Customer Charge):
All kWh, per kWh .. .............. .
Per Meter Per Month
$1.60
Minimum Charge:
The monthly minimum charge shall be the monthly Customer Charge
SPECIAL CONDITIONS
4.6470
1. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
2. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
Authorized by fte City of Vernon
Ordinance No.
940
Effective 12/06/83
Resolution No.
7062
Effective 01/01/98
Resolution No.
7557
Effective 07/01/00
Resolution No.
7638
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
1
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. GS-1
GENERAL SERVICE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Customer Charge .............................
Energy Charge
All kWh, per kWh .........................
Per Meter Per Month
Summer Winter
$7.47 $7.47
11.333C 10.540C
Minimum Charge:
The monthly minimum charge shall be the monthly Customer Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage.
2. X-Ray Installations: Where the Utility installs the standard transformer capacity requested
by a customer to service separately an X-ray installation, the billing will be increased by
$1.03 per kVA of transformer capacity requested.
Authorized by the City of Vernon
Ordinance No. 940 Effective 12/06/83
Resolution No. 7062 Effective 01/01/98
Resolution No. 7557 Effective 07/01/00
Resolution No. 7638 Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective OS 1/01
Resolution No. 8294 Effective 11/01/03
1
Schedule GS-1 (cont.)
3. Temporary Discontinuance of Service: Where the use of energy is seasonal or
intermittent, no adjustments will be made for a temporary discontinuance of service. Any
customer prior to resuming service within twelve months after such service was
discontinued will be required to pay all charges which would have been billed if service
had not been discontinued.
4. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
5. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
6. Excess Transformer Capacity: The amount of transformer capacity requested by a
customer which is in excess of the applicable standard transformer size determined by the
Utility as required to serve the customer's measurable kilowatt demand. Excess
transformer capacity shall be available to all customers under this schedule and shall be
billed at $1.03 per kVA per month.
7. Seasons: The summer season time periods shall commence at 12:01 a.m. May 1 and
continue through October 31 of each year and the winter season time periods shall
commence at 12:01 a.m. November 1 and continue through April 30 of the following year.
8. Removal or Modification of Equipment: Where transformers or facilities for services are
ordered removed or modified by a customer and such services are restored within 36
months from the date of the order to remove or to modify, the customer shall pay to the
Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or
modification of the transformers or facilities of the prior installation and the estimated cost
of such reinstallation.
uthorized by the Citv of Verno
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective O1a1/Ol
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
2
Schedule GS-2 (cont.)
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage.
2. Billing Demand: Billing demand shall be the kilowatts of maximum demand, determined
to the nearest kW.
3. Maximum Demand: The maximum demand in any month shall be the measured maximum
average kilowatt input, indicated or recorded by instruments to be supplied by the Utility,
during any 15-minute interval in the month.
4. Voltage Discount: The charges including adjustment will be reduced by 3 % for service
delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service
delivered and metered at voltages of from 11 kV through 50 kV; except that when only one
transformation from a transmission voltage level is involved, a customer normally entitled
to a 3 % discount will be entitled to a 4 % discount.
5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three
consecutive months, a kilovar-hour meter will be installed as soon as practical, and,
thereafter, until the billing demand has been less than 150 kW for twelve consecutive
months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand
imposed on the Utility in excess of 33 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of
measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours.
Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet
device will be installed on the kilovar-hour meter to prevent its reverse operation on
leading power factors.
6. X-Ray Installations: Where the Utility installs the standard transformer capacity requested
by a customer to serve separately an X-Ray installation, the minimum charge will be
increased by $1.03 per kVA of transformer capacity requested.
Authorized by the City of Vernon
Ordinance No 940
Resolution No. 7062
Resolution No. 7557
Resolution No. 7638
Effective 12/06/83
Effective 01/01/98
Effective 07/O1/00
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
2
Schedule GS-2 (cont.)
7. Temporary Discontinuance of Service: Where the use of energy is seasonal or
intermittent, no adjustments will be made for a temporary discontinuance of service. Any
customer prior to resuming service within twelve months after such service was
discontinued will be required to pay all charges which would have been billed if service
had not been discontinued.
8. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract
demand either required by the Utility because of the nature of the customer's load or
requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA
per month.
9. Contract Demand: A contract demand will be established by the Utility, based upon
applicant's demand requirements for any customer newly requesting service on this
schedule and for any customer of record on this schedule who requests an increase or
decrease in transformer capacity in accordance with the Light and Power Department Rules
for Electric Service. A contract demand arrangement is available upon request for all
customers of record on this schedule. Contract demand is based upon the nominal kilovolt -
ampere rating of the Utility's serving transformer(s) or the standard transformer size
determined by the kilowatt demand, whichever is less and is expressed in kilowatts.
10. Minimum Demand Charge: Where a contract demand is established, the monthly
minimum demand charge shall be $1.03 per kilowatt of contract demand.
11. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
12. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
13. Recording Meters: A recording -type meter shall be installed for all customers purchasing
under this schedule and having peak requirements of 500 kW or more. Customers having
recording -type meters are not eligible to purchase under this schedule and must be
transferred to Schedule No. TOU-V.
14. Removal or Modification of Equipment: Where transformers or facilities for services are
ordered removed or modified by a customer and such services are restored within 36
months from the date of the order to remove or to modify, the customer shall pay to the
Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or
modification of the transformers or facilities of the prior installation and the estimated cost
of such reinstallation.
Authorized by the Citv of Vernon
Ordinance No
940
Effective
12/06/83
Resolution No.
7062
Effective
01/01/98
Resolution No.
7557
Effective
07/01/00
Resolution No.
7638
Effective
10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. LS-1
LIGHTING -STREET AND HIGHWAY
UTILITY -OWNED SYSTEM
APPLICABILITY
Applicable to street and highway lighting service supplied from overhead lines where the Utility owns
and maintains the street lighting equipment.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Energy Curtailment
Service
Midnight or
All Night Service Equivalent Service
Facilities Charge
Lamp Size -Lumens Per Lamp Per Month Per Lamp Per Month
Per Lamp Per Month
High Pressure Sodium Vapor Lamps
5,800 Lumens $ 8.24 $ 7.68
$ 5.68
9,500 Lumens 9.55 8.54
5.84
16,000 Lumens 11.93 10.36
6.37
22,000 Lumens 13.97 11.85
6.74
25,500 Lumens 15.27 12.76
6.79
47,000 Lumens 21.59 17.21
7.11
Authorized by the Citv of Vernon
Ordinance No.
940
Effective 12/06/83 Resolution No. 7689 Effective 01/01/01
Resolution No.
7062
Effective 01/01/98 Resolution No. 7747 Effective 05/01/01
Resolution No.
7557
Effective Q7/O1/00 Resolution No. 8294 Effective—! _1/01/03
Resolution No.
7638
Effective 10/01/00
1
Schedule LS-1 (cont.)
SPECIAL CONDITIONS
Standard Equipment Furnished: Bracket or mast arm construction will be furnished.
Where feasible with existing facilities, center suspension construction may be furnished.
Enclosed luminaires will be furnished for lamps of 2,500 lumens, or larger, and open
reflector lighting units will be furnished for lamps of 1,000 lumens. Such standard lighting
equipment will be attached to wood poles.
2. Other than Standard Equipment: Where the customer requests the installation of other than
the standard equipment furnished by the Utility and such requested equipment is acceptable
to the Utility, the Utility will install the requested equipment provided the customer agrees
to advance the estimated difference in cost installed between such equipment and standard
equipment. Advances made in connection with such agreements become and remain the
sole property of the Utility; as do the said equipment.
3. Hours of Service: Under the Utility's standard all night operating schedule approximately
4,140 hours of service per year will be furnished.
4. Removal or Modification of Equipment: Where street lighting service and facilities were
ordered removed or modified by a customer and such services and facilities, or their
equivalent, are ordered reinstalled within 36 months from the date of the order to remove
or to modify, the customer shall pay to the Utility in advance of such reinstallation a
nonrefundable amount equal to the cost of removal or modification of the prior facilities
and the estimated cost of such reinstallation. Facilities removed or installed remain the
sole property of the Utility.
5. Energy Curtailment Service:
a. Where the Customer requests the installation and/or removal of equipment
in order to obtain Energy Curtailment Service, and such request is
acceptable to the Utility, the Utility will comply with such request provided
the customer first agrees to pay to the Utility the estimated installation cost
for any additional equipment required and/or the removal cost of any
equipment currently installed. Such payments will not be refunded and
shall be paid in advance or in installments acceptable to Utility over a
period of not to exceed three years. Facilities installed in connection with
such request become and remain the sole property of the Utility.
Authorized_bv the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
Schedule LS-1 (cont.)
b. Under the Utility's midnight (PST) or equivalent service operating
schedule, approximately 2,090 hours of service per year will be furnished.
C. Facilities charges shall be applicable under this schedule only when the
Utility has been requested to discontinue the existing service by the
customer and the customer has stipulated that the facilities are to be left in
place for future use.
6. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
7. Public Benefits Charge,: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
Authorized by the Citv of Vernon
Ordinance No. 940
Resolution No. 7062
Resolution No. 7557
Resolution No. 7638
Effective 12/06/83
Effective O1/O1/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective Ol/Ol/01
Resolution No. 7747 Effective 05 111101
Resolution No. 8294 Effective 11/01/03
9
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. LS-2
LIGHTING -STREET AND HIGHWAY
CUSTOMER -OWNED INSTALLATION
APPLICABILITY
Applicable to service for the lighting of streets, highways, other public thoroughfares, and publicly -
owned and publicly -operated automobile parking lots which are open to the general public, where the
customer owns the street lighting equipment.
TERRITORY
Within the city limits of the City of Vernon.
RATES
RATE A-UNMETERED SERVICE:
For each kW of lamp load, per kW .........
RATE B-METERED SERVICE:
Meter Charge:
Multiple Service............ .
Series Service ........ .....
Energy Charge (to be added to Meter Charge):
All kWh, per kWh ..........
RATE C-MAINTENANCE SERVICE -OPTIONAL:
In addition to the Rate A or Rate B charges.
Authorized by the Citv of Vernon
Ordinance No
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective
12/06/83
Effective
01/01/98
Effective
07/01/00
Effective
10/01/00
Per Month
All Night Service Midnight Service
Multiple Series Multiple Series
$27.70 $36.00 $16.12 $19.58
Per Meter
Per Month
$ 4.78
$12.73
7.799C
Resolution No. 7698 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
1
Schedule LS-2 (cont.)
Lamp Rating
Per Lamp
Lumens
Lamp Type
Per Mon
1,000*
Incandescent Extended Service .....................
$0.34
2,500*
Incandescent Extended Service .....................
0.39
4,000*
Incandescent Extended Service .....................
0.41
6,000*
Incandescent Extended Service .....................
0.43
10,000*
Incandescent Extended Service .....................
0.46
3,500*
Mercury Vapor ..............................
0.37
7,000*
Mercury Vapor ..............................
0.34
11,000*
Mercury Vapor ..............................
0.41
20,000*
Mercury Vapor ..............................
0.37
35,000*
Mercury Vapor ..............................
0.56
55,000*
Mercury Vapor ..............................
0.50
5,800
High Pressure Sodium Vapor ......................
0.82
9,500
High Pressure Sodium Vapor ......................
0.82
16,000
High Pressure Sodium Vapor ......................
0.80
22,000
High Pressure Sodium Vapor ......................
0.81
25,500
High Pressure Sodium Vapor ......................
0.81
47,000
High Pressure Sodium Vapor ......................
0.83
SPECIAL CONDITIONS
1. Ownership of Facilities:
a. For multiple systems, the Utility will deliver service 120/240 volt overhead circuits.
For series systems the Utility will furnish and maintain constant current regulating
transformers and deliver service at the secondary side of such transformers.
b. The customer will furnish and maintain all utilization equipment beyond the point
of delivery except for maintenance service provided by the Utility in accordance
with Special Condition 3.
C. Meter locations for multiple systems shall be at points mutually agreed upon. Meter
locations for series systems shall be on the primary supply circuit to the constant
current regulating transformer at a point acceptable to the Utility.
*Closed to new installation as of November 1, 1997
Authorized by the Citv of Vernon
Ordinance No
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7698 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
2
Schedule LS-2 (coot.)
2.
Lamp Load: The lamp load for regular (general purpose) multiple incandescent lamps
shall be the manufacturers' lamp rating in watts.
The lamp load in watts for lumen rated street lighting lamps shall be as follows:
HIGH
MERCURY
PRESSURE
INCANDESCENT VAPOR
SODIUM PRESSURE
MULTIPLE SERIES
GROUP
GROUP EXTENDED REPLACEMENT EXTENDED
LUMENS
REGULAR REPLACEMENT SVS. REGULAR Svc. SVS.
MULT.
SERIES
Watts Watts Watts Watts Watts Watts Watts
Watts
Watts
600*
55 58 -- 42 45 -
--
-
800*
-- -- 57 --
--
-
1,000*
85 92 103 62 65 73 -
--
2,500*
175 189 202 143 152 164 --
--
3,500*
-- 125
--
-
4,000*
268 295 327 210 -- 251 --
--
--
5,800*
-- 220 -- --
82
85
6,000*
370 405 448 310 325 364 --
--
--
7,000*
-- -- -- -- -- -- 208
--
--
9,500
-- --
140
121
10,000*
575 620 690 525 558 605 --
--
--
11,000*
-- 292
-
-
15,000*
800 860 -- 755 822 - 447
--
--
16,000
-- --
202
174
20,000*
-- 447
--
—
22,000
-- --
248
233
25,000*
-- -- -- 1,275
--
--
25,500
-- -- ----
320
-
35,000*
- 753
--
-
47,000
--
485
55,000*
-- -- -- -- ---- 1,058
--
Total lamp load shall be determined to the nearest 1 / 10 kW
*Closed to new installation as of November 1, 1997.
Authorized by the Cily of
Vernon
Ordinance No
940
Effective
12/06/83 Resolution No. 7698 Effective 01/01/01
Resolution No.
7062
Effective
01/01/98 Resolution No. 7747 Effective 05/01/01
Resolution No.
7557
Effective
07/01/00 Resolution No. 8294 Effective 11/01/03
Resolution No.
7638
Effective
10/01/00
3
Schedule LS-2 (cont.)
3. Maintenance Service: Maintenance service furnished by the Utility under Rate C for the
lamps specified shall include the following:
a. Renewal of lamps after the original installation by the customer.
b. Regular inspection.
C. Periodic cleaning of globes.
d. Labor of replacing lamps and globes.
Incandescent lamps furnished under this provision will be extended service lamps only.
Mercury vapor lamps and high pressure sodium vapor lamps furnished under this provision
will be as specified by the Utility. Globes for renewal shall be furnished by the customer.
Maintenance service will be furnished only where, in the opinion of the Utility, no undue
hazard or expense will result because of location, mounting height, or other reasons.
4. Switching Facilities: For all night or midnight (Pacific Standard Time) service under the
Utility's standard operating schedules, the Utility will furnish, maintain, and operate the
necessary switching facilities. For other operating schedules, the customer shall furnish,
maintain, and operate switching facilities as specified by the Utility and take metered service
under Rate B.
5. Hours of Service: Under the Utility's standard all night operating schedule, approximately
4,140 hours of service per year will be furnished and under the Utility's standard midnight
(Pacific Standard Time) operating schedule approximately 2,090 hours of service per year will
be furnished.
6. Removal of Equipment: Where street lighting service and facilities were ordered removed by
a customer and such service and facilities, or their equivalent, are ordered reinstalled within
36 months from the date of the order to remove, the customer shall pay to the Utility in
advance of reinstallation a nonrefundable amount equal to the cost of removal of the prior
facilities and the estimated cost of such reinstallation. Utility -owned facilities removed or
installed remain the sole property of the Utility.
7. Energy Curtailment Service: Where the customer requests the installation and/or removal of
equipment in order to curtail energy requirements, and such request is acceptable to the
Utility, the Utility will comply with such request provided the customer first agrees to pay to
Utility the estimated cost installed or any additional equipment required and/or the removal
cost of any equipment currently installed.
Authorized by the Citv of Vernon
Ordinance No 940
Effective 12/06/83
Resolution No. 7062
Effective O1/O1/98
Resolution No. 7557
Effective 07/O1/00
Resolution No. 7638
Effective 10/01/00
Resolution No. 7698 Effective O1/O1/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/O1/03
Schedule LS-2 (cont.)
Such payments will not be refunded and shall be paid in advance or in installments
acceptable to Utility over a period of not to exceed three years. Facilities installed in
connection with such requests become and remain the sole property of the Utility.
8. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
9. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The charge
is 2.85 percent of the total bill before any special fees or charges. In accordance with the
mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will be assessed
through January 1, 2012.
Authorized by the Citv of Vernon
Ordinance No 940
Resolution No. 7062
Resolution No. 7557
Resolution No. 7638
Effective 12/06/83
Effective O1/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7698 Effective O1/O1/O1
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/O1/03
5
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. OL-1
OUTDOOR AREA LIGHTING SERVICE
APPLICABILITY
Applicable to outdoor area lighting service, other than street and highway lighting service, supplied
from overhead lines where the Utility owns and maintains the area lighting equipment.
TERRITORY
Within the city limits of the City of Vernon.
RATES
LUMINAIRE CHARGE:
Energy Curtailment Service
Midnight or
All Night Service Equivalent Service Facilities Charge
Lamp Size -Lumens Per Lamp Per Month Per Lamp Per Month Per Lamp Per Month
High -Pressure Sodium Vapor Lamps
5,800 Lumens ......... $ 8.52 $ 8.01 $5.73
9,500 Lumens ......... 9.97 $ 9.05 $5.89
22,000 Lumens ......... $14.88 $12.84 $6.79
POLE CHARGE (to be added to Luminaire Charge): Per Pole
Per Month
For each additional new wood pole installed .... $2.75
Authorized by the Citv of Vernon
Ordinance No. 940
Effective
12/06/83
Resolution No. 7062
Effective
01 01/98
Resolution No. 7557
Effective
07/01/00
Resolution No. 7638
Effective
10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
1
Schedule OL-1 (cont.)
SPECIAL CONDITIONS
Hours of Service: Area all night lighting service will be furnished from dusk to dawn,
approximately 4,140 hours per year, by Utility -owned luminaires supplied from the
Utility's existing 120/240 volt overhead circuits and mounted on existing Utility -owned
wood poles as standard equipment.
2. Other Than Standard Equipment: Where the customer requests the installation of other
than the standard equipment furnished by the Utility and such requested equipment is
acceptable to the Utility, the Utility will install the requested equipment provided the
customer agrees to advance the estimated difference in installation cost installed between
such equipment and standard equipment. Advances made for this purpose will not be
refunded. Facilities installed in connection with such agreements become and remain the
sole property of the Utility. Utility will provide customer with adjusted per lamp charges
and customer will pay such charges.
3. Service and Facilities Furnished: This service will be in accordance with Utility's
specifications as to the equipment, installation, maintenance, and operation.
4. Replacement of Lamps: The Utility will replace lamps on a scheduled basis, and
individual lamps will be replaced upon service failure, as soon as practical after
notification by customer, subject to Utility's operating schedules.
5. Contract: A written contract for a term of three year will be required by the Utility when
service is first established under this schedule.
6. Type of Service: This service will be furnished only where the installation is considered
by the Utility to be of a permanent and established character.
7. Removal or Modification of Equipment: Where area lighting service and facilities were
ordered removed or modified by a customer and such service and facilities, or their
equivalent, are ordered reinstalled within 36 months from the date of the order to remove
or to modify, the customer shall pay to the Utility in advance of reinstallation a
nonrefundable amount equal to the cost of removal or modification of the prior facilities
and the estimated cost of such reinstallation. Facilities removed or installed remain the
sole property of the Utility.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective OS 1/01
Resolution No. 8294 Effective 11/01/03
PA
Schedule OL-1 (cont.)
8. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
9. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
Authorized by the Citv of Vernon
Ordinance No. 940
Resolution No. 7062
Resolution No. 7557
Resolution No. 7638
Effective 12/06/83
Effective O1/O1/98
Effective 07/01/00
Effective 10/01100
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/O1/03
Q
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. PA-1
POWER -AGRICULTURAL AND PUMPING
CONNECTED LOAD BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes or for general water or sewerage
pumping.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Horsepower of
Connected Load
Per Meter
2 and over .........................
Energy Charge to be added to Service Charge -Rate
All kWh, per kWh ....................
Monthly Service Charge
Per Meter Per hp
$1.06
10.457C
Minimum Charge: The monthly minimum charge shall be the monthly Service Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard power voltage.
Authorized by the City of Vernon
Ordinance No.
940
Effective 12/06/83
Resolution No.
7062
Effective 01/01/98
Resolution No.
7557
Effective 07/01/00
Resolution No.
7638
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
1
Schedule PA-1 (cont.)
2. Connected Load: Connected load is the sum of the rated capacities of all of the customer's
equipment that it is possible to connect to the Utility's lines at the same time, determined
to the nearest 1/10 hp. In no case will charges be based on less than 2 hp for single-phase
service or no less than 3 hp for three-phase service. The rated capacity of the customer's
equipment will be the rated horsepower output of standard rated motors, and the rated
kilovolt -ampere input capacity of other equipment, with each kilovolt -ampere of input
considered equal to one horsepower. Normally such ratings will be based on the
manufacturer's rating as shown on the nameplate or elsewhere but may, at the option of
the Utility, be based on tests or other reliable information.
3. Overloaded Motors: Whenever, upon test, any motor under normal operating conditions
is found to be delivering more than 115 percent of its capacity as indicated by its nameplate
rating, the Utility may disregard the nameplate rating and base its charges upon the output
as calculated from test. Any motor which is billed on a basis in excess of its nameplate
rating in accordance with this special condition shall be rested at intervals to be determined
by the Utility or upon notification by the customer of a permanent change in operating
conditions.
4. Temporary Reduction of Connected Load: Where the use of energy is seasonal or
intermittent, no adjustment will be made for any temporary reduction of connected load.
Any customer, prior to resuming service on such connected load within 12 months after
it was disconnected, will be required to pay all charges which would have been billed if
the temporary reduction of connected load had not been made.
5. In -Lieu Tax and Franchise Payments: The base rates and charges have been increased by
3 percent to reflect payments in -lieu of tax and franchise payments.
6. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
Authorized by the City of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
2
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. PA-2
POWER -AGRICULTURAL AND PUMPING
DEMAND BASIS
APPLICABILITY
Applicable to power service for general agricultural purposes for general water or sewerage pumping.
Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Per Meter Per Month
Demand Charge:
First 75 kW or less of billing demand .............
All excess kW of billing demand, per kW ..........
Energy Charges (to be added to Demand Charge):
All kWh per kWh ...........................
Minimum Charge:
The monthly minimum charge shall be the monthly Demand Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
$556.97
$ 7.426
8.036C
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective OS/Ol/Ol
Resolution No. 8294 Effective 11/O1/03
1
Schedule PA-2 (cont.)
2. Billing Demand: The billing demand shall be the kilowatts of maximum demand but not
less than 50 % of the highest maximum demand established in the preceding eleven months,
however, in no case shall the billing demand be less than 75 kW. Billing demand shall be
determined to the nearest kW.
3. Maximum Demand: The maximum demand in any month shall be the measured maximum
average kilowatt input, indicated or recorded by instruments to be supplied by the Utility,
during any 15-minute metered interval in the month. Where demand is intermittent or
subject to violent fluctuations, a 5-minute interval may be used.
4. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three
consecutive months, a kilovar-hour meter will be installed as soon as practical, and,
thereafter, until the billing demand has been less than 150 kW for twelve consecutive
months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand
imposed on the Utility in excess of 33 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of
measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours.
Demand in kilowatts and kilovars shall be determined to the nearest unit. A ratchet device
will be installed on the kilovar-hour meter to prevent its reverse operation on leading
power factors.
5. Te=orary Discontinuance of Service: Where the use of energy is seasonal or
intermittent, no adjustments will be made for a temporary discontinuance of service. Any
stomer, prior to resuming service within twelve months after such service was
discontinued, will be required to pay all charges which would have been billed if service
had not been discontinued.
6. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
7. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
Authorized by the City of Vernon
Ordinance No.
940
Effective 12/06/83 Resolution No. 7689 Effective 01/O1/O1
Resolution No.
7062
Effective 01/01/98 Resolution No. 7747 Effective 05/01/01
Resolution No.
7557
Effective 07/O1/00 Resolution No. 8294 Effective 11/O1/03
Resolution No.
7638
Effective 10/01/00
Schedule PA-2 (cont.)
8. Excess Transformer CapacitX: The transformer capacity in excess of a customer's contract
demand which is either required by the Utility because of the nature of the customer's
load or requested by the customer. Excess transformer capacity shall be billed at $1.03
per kVA per month.
9. Contract Demand: A contract demand will be established by the Utility, based on
applicant's demand requirements for any customer of record on this schedule who requests
an increase or decrease in transformer capacity in accordance with the Light and Power
Department Rules for Electric Service. A contract demand arrangement is available upon
request for all customers of record on this schedule. Contract demand is based upon the
nominal kilovolt -ampere rating of the Utility's serving transformer(s) or the standard
transformer size determined by the Utility as required to serve the customer's stated
measurable kilowatt demand, whichever is less and is expressed in kilowatts.
10. Minimum Demand Charge: Where a contract demand is established, the monthly
minimum demand charge shall be $1.03 per kilowatt of contract demand.
Authorized by the City of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
3
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. PA-TOU
POWER -AGRICULTURAL AND PUMPING
TIME -OF -USE
APPLICABILITY
Applicable to power service for general agricultural purposes for general water or sewerage pumping.
Service under this schedule is elective for customers with a monthly maximum demand that exceeds
100 kW for three months during the preceding twelve months but are less than 500 kW for any nine
months during the preceding twelve months. Service under this schedule is subject to meter
availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES
Customer Charge .. ............................ .
Demand Charge (to be added to Customer Charge):
All kW of on -peak maximum billing demand, per kW .....
Plus all kW of mid -peak maximum billing demand, per kW .
Plus all kW of off-peak billing demand, per kW .........
Energy Charge (to be added to Demand Charge):
All on -peak kWh, per kWh ......................
Plus all mid -peak kWh, per kWh ..................
Plus all off-peak kWh, per kWh ...................
to Minimum Demand Charge. See Special Condition No. 11.)
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Per Meter Per Month
$164.29
$ 10.954
$ 1.700
No Charge*
5.5130
5.1680
4.6510
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective Q 1/01
Resolution No. 8294 Effective 11/01/03
1
Schedule PAJOU (cont.)
SPECIAL CONDITIONS
1. Time Period:
Time Periods are defined as follows:
On -Peak: 1:00 p.m. to 7:00 p.m.
Summer Weekdays except holidays
5:00 p.m. to 10:00 p.m.
Winter weekdays except holidays
Mid -Peak 9:00 a.m. to 1:00 p.m. and
7:00 p.m. to 11:00 p.m.
Summer weekdays except holidays
8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off -Peak: All other hours:
Off -Peak Holidays are: New Year's Day (January 1), Washington's
Birthday (third Monday in February), Memorial Day (last Monday in May),
Independence Day (July 4), Labor Day (first Monday in September),
Veteran's Day (November 11), Thanksgiving Day (fourth Thursday in
November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized
as an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through
October 31 of each year and the winter season time periods shall commence at 12:01 a.m.
November 1 and continue through April 30 of the following year.
2. Voltage: Service will be supplied at one standard voltage.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
2
Schedule PAJOU (cont.)
3. Billing; Demand: The billing demand shall be the kilowatts of maximum demand but not less
than 25 % of the highest maximum demand established in the preceding eleven months,
however, in no case shall the billing demand be less than 50 kW. Billing demand shall be
determined to the nearest kW .
4. Maximum Demand: The maximum demand in any month shall be the measured maximum
average kilowatt input, indicated or recorded by instruments to be supplied by the Utility,
during any 15-minute metered interval in the month. Where demand is intermittent or
subject to violent fluctuations, a 5-minute interval may be used.
5. Power Factor Adjustment: When the billing demand has exceeded 200 kW for three
consecutive months, a kilovar-hour meter will be installed as soon as practical, and,
thereafter, until the billing demand has been less than 150 kW for twelve consecutive
months, the charges will be adjusted each month for power factor, as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand
imposed on the Utility in excess of 33 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured
maximum demand by the ratio of the kilovar-hours to the kilowatt-hours. Demand in
kilowatts and kilovars shall be determined to the nearest unit. A ratchet device will be
installed on the kilovar-hour meter to prevent its reverse operation on leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy seasonal or intermittent,
no adjustments will be made for a temporary discontinuance of service. Any customer, prior
to resuming service within twelve months after such service was discontinued, will be
required to pay all charges which would have been billed if service had not been
discontinued.
7. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
8. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 07/01/00
Effective 10/01/00
Resolution No. 7689 Effective 01 01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/01/03
3
Schedule PA-TOU (cont.)
9. Excess Transformer Capacity: The transformer capacity in excess of a customer' s contract
demand which is either required by the Utility because of the nature of the customer' s load
or requested by the customer. Excess transformer capacity shall be billed at $1.03 per kVA
per month.
10. Contract Demand: A contract demand will be established by the Utility, based on
applicant' s demand requirements for any customer of record on this schedule who requests
an increase or decrease in transformer capacity in accordance with the Light and Power
Department Rules for Electric Service. A contract demand arrangement is available upon
request for all customers of record on this schedule. Contract demand is based upon the
nominal kilovolt -ampere rating of the Utility's serving transformer(s) or the standard
transformer size determined by the Utility as required to serve the customer's stated
measurable kilowatt demand, whichever is less and is expressed in kilowatts.
11. Minimum Demand Charge: Where a contract demand is established, the monthly minimum
demand charge shall be $1.03 per kilowatt of contract demand.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7557
Resolution No.
7638
Effective
12/06/83
Effective
01/01/98
Effective
07/O1/00
Effective
10/01/00
Resolution No. 7689 Effective 01/01/01
Resolution No. 7747 Effective 05/01/01
Resolution No. 8294 Effective 11/O1/03
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. TC-1
TRAFFIC CONTROL SERVICE
APPLICABILITY
Applicable to single-phase service for traffic -directional signs or traffic -signal systems located on
streets, highways and other public thoroughfares and to railway crossing and track signals.
TERRITORY
Within the city limits of the City of Vernon.
RATES Per Meter Per Month
Customer Charge: $5.04
Energy Charge (to be added to Customer Charge) :
All kWh, per kWh ........................ 9.304G
Minimum Charge: The monthly minimum charge shall be
the monthly Customer Charge.
SPECIAL CONDITIONS
1. Voltage: Service will be supplied at one standard voltage not in excess of 240 volts or, at
the option of the Utility, at 240/480 volts, three -wire, single-phase.
2. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
3. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
Authorized by the Citv of Vernon
Ordinance No. 940
Effective
12/06/83 Resolution No. 7689 Effective 01/01/01
Resolution No. 7062
Effective
01/01/98 Resolution No. 7747 Effective 05/01/01
Resolution No. 7557
Effective
07/01/00 Resolution No. 8294 Effective 11/01/03
Resolution No. 7638
Effective
10/01/00
1
CITY OF VERNON
LIGHT AND POWER DEPARTMENT
Schedule No. TOU-G
GENERAL SERVICE -LARGE
APPLICABILITY
Applicable to single- and three-phase general service including lighting and power. Service under
this schedule is elective for customers served under Schedule No. GS-2 with a monthly maximum
demand that exceeds 100 kW for three months during the preceding twelve months but is less than
500 kW for any nine months during the preceding twelve months. Service under this schedule is
elective for all existing customers with time of use metering who have been taking service under
Schedule TOU-V with a monthly maximum demand that exceeds 100 kW for three months during
the preceding twelve months but is less than 500 kW for any nine months during the preceding 12
months. Service under this schedule is subject to meter availability.
TERRITORY
Within the city limits of the City of Vernon.
RATES
PER METER PER MONTH
Summer Winter
May, June, Oct July, August, Sent Nov. thru April
Customer Charge ................................
$164.29
$164.29
$164.29
Demand Charge (to be added to Customer Charge):
All kW of on -peak maximum billing demand, per kW .......
$ 9.269
$ 10.954
$ 9.269
Plus all kW of mid -peak maximum billing demand, per kW ...
$ 1.700
$ 1.700
$ 1.700
Plus all kW of off-peak billing demand, per kW ...........
No Charge*
No Charge*
No Charge*
Energy Charge (to be added to Demand Charge):
All on -peak kWh, per kWh ........................
5.490C
6.844C
5.490C
Plus all mid -peak kWh, per kWh ....................
5.145C
6.499C
5.145C
Plus all off-peak kWh, per kWh .....................
4.628C
5.331C
4.628C
to Minimum Demand Charge. See Special Condition No. 9.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No. 7248
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective 01/01/98
Effective 01/01/99
Effective 07/01/00
Effective 10/01/00
Resolution No.
7689
Resolution No.
7747
Resolution No.
7841
Resolution No.
8294
Effective 01/01/01
Effective 05/01/01
Effective 10/01/01
Effective 11/01/03
1
Schedule TOU-G (cont.)
SPECIAL CONDITIONS
Time Period:
Time Periods are defined as follows:
On -Peak
1:00 p.m. to 7:00 p.m.
Summer Weekdays except holidays
5:00 p.m. to 10:00 p.m.
Winter weekdays except holidays
Mid -Peak
9:00 a.m. to 1:00 p.m. and
7:00 p.m. to 11:00 p.m.
Summer weekdays except holidays
8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off -Peak
All other hours:
Off -Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third
Monday in February), Memorial Day (last Monday in May), Independence Day (July 4),
Labor Day (first Monday in September), Veteran's Day (November 11), Thanksgiving Day
(fourth Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized
as an off-peak period. No change in off-peak will be made for holidays falling on
Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue
through October 31 of each year and the winter season time periods shall commence at
12:01 a.m. November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on -peak, mid -peak, and off-peak time
periods shall be established for each monthly billing period. The billing demand for each
time period shall be the maximum demand for that time period occurring during the
respective monthly billing period. The billing demand shall be determined to the nearest
kW.
3. Maximum Demand: The maximum demands shall be established for the on -peak, mid -
peak, and off-peak periods. The maximum demand for each period shall be the measured
maximum average kilowatt input indicated or recorded by instruments during any 15-
minute metered interval. Where the demand is intermittent or subject to violent
fluctuations, a 5-minute interval may be used.
Authorized by the Citv of Vernon
Ordinance No.
940
Effective
12/06/83
Resolution No.
7689
Effective
01/01/01
Resolution No.
7062
Effective
01/01/98
Resolution No.
7747
Effective
05/01/01
Resolution No.
7248
Effective
01/01/99
Resolution No.
7841
Effective
10/01/01
Resolution No.
7557
Effective
07/01/00
Resolution No.
8294
Effective
11/01/03
Resolution No.
7638
Effective
10/01/00
2
Schedule TOU-G (cont.)
4. Voltage Discount: The charges including adjustment will be reduced by 3 % for service
delivered and metered at voltages of from 2 kV through 10 kV; by 4 % for service
delivered and metered at voltages of from 11 kV through 50 kV; and by 5 % for service
delivered and metered at voltages over 50 kV; except that when only one transformation
from a transmission voltage level is involved, a customer normally entitled to a 3 %
discount will be entitled to a 4 % discount.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted
each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand
imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average
kilovar demand indicated or recorded by metering to be supplied by the Utility
during any 15-minute metered interval in the month. The kilovars shall be
determined to the nearest unit. A ratchet device will be installed on each kilovar
meter to prevent reverse operation of the meter.
b. Service Delivered and Metered at Less than 4 kV: The charges will be adjusted each
month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand
imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of
measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours.
Demand in kilowatts and kilovars shall be determined to the nearest unit. A rachet
device will be installed on the kilovar-hour meter to prevent its reverse operation on
leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or
intermittent, no adjustments will be made for a temporary discontinuance of service. Any
customer, prior to resuming service within twelve months after such service was
discontinued, will be required to pay all charges which would have been billed if service
had not been discontinued.
Authorized by the Citv of Vernon
Ordinance No.
940
Effective 12/06/83
Resolution No.
7689
Effective 01/01/01
Resolution No.
7062
Effective 01/O1/98
Resolution No.
7747
Effective 05/01/01
Resolution No.
7248
Effective O1/O1/99
Resolution No.
7841
Effective 10/01/01
Resolution No.
7557
Effective 07/O1/00
Resolution No.
8294
Effective 11/Ol/03
Resolution No.
7638
Effective 10/01/00
3
Schedule TOU-G (cont.)
7. Excess Transformer Capa!;&: A transformer capacity in excess of a customer's contract
demand which is either required by the Utility because of the nature of the customer's load
or requested by the customer. Excess transformer capacity shall be billed at $1.03 kVA
per month.
8. Contract Demand: A contract demand will be established by the Utility, based upon
applicant's demand requirements for any customer newly requesting service on this
schedule and for any customer of record on this schedule who requests an increase or
decrease in transformer capacity in accordance with the Light and Power Department Rules
for Electric Service. A contract demand arrangement is available upon request for all
customers of record on this schedule. Contract demand is based upon the nominal kilovolt -
ampere rating of the Utility's serving transformer(s) or the standard transformer size
determined by the Utility as required to serve the customer's stated measurable kilowatt
demand, whichever is less and is expressed in kilowatts.
9. Minimum Demand Charge: Where a non -time related maximum demand or contract
demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of
contract demand.
10. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
11. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
12. Voltage: Service will be supplied at one standard voltage.
13. Removal or Modification of Equipment: Where transformers or facilities for services are
ordered removed or modified by a customer and such services are restored within 36
months from the date of the order to remove or to modify, the customer shall pay to the
Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or
modification of the transformers or facilities of the prior installation and the estimated cost
of such reinstallation.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7248
Resolution No.
7557
Resolution No.
7638
Effective 12/06/83
Effective O1/O1/98
Effective 01/O1/99
Effective 07/01/00
Effective 10/01/00
Resolution No.
7689
Resolution No.
7747
Resolution No.
7841
Resolution No.
8294
Effective
O1/O1/01
Effective
05/01/O1
Effective
10/01/O1
Effective
11/01/03
4
Schedule TOU-V (cont.)
SPECIAL CONDITIONS
Time Period:
Time Periods are defined as follows:
On -Pe ak Mid -Pe
1:00 p.m. to 7:00 p.m. 9:00 a.m. to 1:00 p.m. and
Summer weekdays except holidays 7:00 p.m. to 11:00 p.m.
5:00 p.m. to 10:00 p.m. Summer weekdays except holidays
Winter weekdays except holidays 8:00 a.m. to 5:00 p.m.
Winter weekdays except holidays
Off -Peak
All other hours:
Off -Peak Holidays are: New Year's Day (January 1), Washington's Birthday (third Monday
in February), Memorial Day (last Monday in May), Independence Day (July 4), Labor Day
(first Monday in September), Veteran's Day (November 11), Thanksgiving Day (fourth
Thursday in November), and Christmas Day (December 25).
When any holiday listed above falls on Sunday, the following Monday will be recognized as
an off-peak period. No change in off-peak will be made for holidays falling on Saturday.
The summer season time periods shall commence at 12:01 a.m. May 1 and continue through
October 31 of each year and the winter season time periods shall commence at 12:01 a.m.
November 1 and continue through April 30 of the following year.
2. Billing Demand: Separate billing demands for the on -peak, mid -peak, and off-peak time
periods shall be established for each monthly billing period. The billing demand for each time
period shall be the maximum demand for that time period occurring during the respective
monthly billing period. The billing demand shall be determined to the nearest kW.
3. Maximum Demand: The maximum demands shall be established for the on -peak, mid -peak,
and off-peak periods. The maximum demand for each period shall be the measured maximum
average kilowatt input indicated or recorded by instruments during any 15-minute metered
interval. Where the demand is intermittent or subject to violent fluctuations, a 5-minute
interval may be used.
Authorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7248
Resolution No.
7557
Effective 12/06/83
Effective 01/01/98
Effective 01/01/99
Effective 07/01/00
Resolution No.
7638
Resolution No.
7689
Resolution No.
7747
Resolution No.
8294
Effective 10/01/00
Effective 01/01/01
Effective 05/01/01
Effective 11/01/03
Schedule TOU-V (cont.)
4. Voltage Discount: The charges including adjustment will be reduced by 3 % for service
delivered and metered at voltages of from 2 kV through 10 kV; by 4% for service
delivered and metered at voltages of from 11 kV through 50 kV; and by 5 % for service
delivered and metered at voltages over 50 kV; except that when only one transformation
from a transmission voltage level is involved, a customer normally entitled to a 3 %
discount will be entitled to a 4 % discount.
5. Power Factor Adjustment:
a. Service Delivered and Metered at 4 kV or Greater: The charges will be adjusted
each month for reactive demand as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand
imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The maximum reactive demand shall be the highest measured maximum average
kilovar demand indicated or recorded by metering to be supplied by the Utility
during any 15-minute metered interval in the month. The kilovars shall be
determined to the nearest unit. A ratchet device will be installed on each kilovar
meter to prevent reverse operation of the meter.
b. Service Delivered and Metered at Less than 4 M The charges will be adjusted each
month for the power factor as follows:
The charges will be increased by 20.6 cents per kilovar of maximum reactive demand
imposed on the Utility in excess of 20 percent of the maximum number of kilowatts.
The kilovars of reactive demand shall be calculated by multiplying the kilowatts of
measured maximum demand by the ratio of the kilovar-hours to the kilowatt-hours.
Demands in kilowatts and kilovars shall be determined to the nearest unit. A ratchet
device will be installed on the kilovar-hour meter to prevent its reverse operation on
leading power factors.
6. Temporary Discontinuance of Service: Where the use of energy is seasonal or
intermittent, no adjustments will be made for a temporary discontinuance of service. Any
customer, prior to resuming service within twelve months after such service was
discontinued, will be required to pay all charges which would have been billed if service
had not been discontinued.
Authorized by the City of Vernon
Ordinance No.
940
Effective
12/06/83
Resolution No.
7638
Effective 10/01/00
Resolution No.
7062
Effective
O1/O1/98
Resolution No.
7689
Effective 01/01/01
Resolution No.
7248
Effective
O1/01/99
Resolution No.
7747
Effective 05/01/01
Resolution No.
7557
Effective
07/01/00
Resolution No.
8294
Effective 11/O1/03
c
Schedule TOU-V (cont.)
7. Excess Transformer Capacity: The transformer capacity in excess of a customer's contract
demand either required by the Utility because of the nature of the customer's load or
requested by the customer. Excess transformer capacity shall be billed at $1.03 per.kVA
per month.
8. Contract Demand: A contract demand will be established by the Utility, based upon
applicant's demand requirements for any customer newly requesting service on this
schedule and for any customer of record on this schedule who requests an increase or
decrease in transformer capacity in accordance with the Light and Power Department Rules
for Electric Service. A contract demand arrangement is available upon request for all
customers of record on this schedule. Contract demand is based upon the nominal kilovolt -
ampere rating of the Utility's serving transformer(s) or the standard transformer size
determined by the Utility as required to serve the customer's stated measurable kilowatt
demand, whichever is less and is expressed in kilowatts.
9. Minimum Demand Charge: Where a non -time related maximum demand or contract
demand is established, a monthly minimum demand charge shall be $1.03 per kilowatt of
contract demand.
10. In -Lieu of Tax and Franchise Payments: The base rates and charges have been increased
by 3 percent to reflect payments in -lieu of tax and franchise payments.
11. Public Benefits Charge: A mandatory Public Benefits Charge has been assessed pursuant
to Assembly Bill 1890, signed into law by the Governor on September 20, 1996. The
charge is 2.85 percent of the total bill before any special fees or charges. In accordance
with the mandates of Assembly Bill 995, the Public Benefits Charge of 2.85 percent will
be assessed through January 1, 2012.
12. Voltage: Service will be supplied at one standard voltage.
13. Removal or Modification of Equipment: Where transformers or facilities for services are
ordered removed or modified by a customer and such services are restored within 36
months from the date of the order to remove or to modify, the customer shall pay to the
Utility in advance of reinstallation a nonrefundable amount equal to the cost of removal or
modification of the transformers or facilities of the prior installation and the estimated cost
of such reinstallation.
uthorized by the Citv of Vernon
Ordinance No.
940
Resolution No.
7062
Resolution No.
7248
Resolution No.
7557
Effective 12/06/83
Effective O101/98
Effective O1/01/99
Effective 07/01/00
Resolution No. 7638
Resolution No. 7689
Resolution No. 7747
Resolution No. 8294
Effective 10/01/00
Effective 01/01/01
Effective OS 1/Ol
Effective 11/01/03
4