Resolution No. 84352
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
P�M
RESOLUTION NO. 8435
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON APPROVING AND RATIFYING THE EXECUTION OF
AMENDMENTS TO CONTRACT FOR PROCUREMENT,
CONSTRUCTION AND STARTUP BY AND BETWEEN THE CITY OF
VERNON AND MARELICH MECHANICAL CO., INC., DBA
UNIVERSITY MARELICH MECHANICAL & GALLIERA, INC.,
DBA TRICO CONSTRUCTION
WHEREAS, on January 22, 2003, the City Council of the City
of Vernon adopted Resolution No. 8115 approving a Contract for
Procurement, Construction and Startup (the "Contract") with Marelich
Mechanical Co., Inc., dba University Marelich Mechanical & Galliera,
Inc., dba Trico Construction, a Joint Venture, ("Marelich"); and
WHEREAS, on August 12, 2003, the Finance Committee
considered the recommendation of Bruce V. Malkenhorst, the Director of
Finance, that a change order to the Contract with Marelich for
additional services in the sum of $3,009,756 be approved; and
WHEREAS, on March 16, 2004, the Finance Committee considered
the recommendation of Bruce V. Malkenhorst, the Director of Finance,
that a change order to the Contract with Marelich for additional
services in the sum of $1,922,124 be approved; and
WHEREAS, in order to safeguard Vernon's rights under the
Contract and in order to meet the urgent need for the additional
services, the City Administrator executed a First Amendment to the
Contract on or about October 14, 2003 and a Second Amendment to the
Contract on or about March 24, 2004, and authorized payment in
accordance with the terms thereof, subject to ratification by the City
Council; and
2811 WHEREAS, on April 21, 2004, the Finance Committee considered
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
the recommendation of Bruce V. Malkenhorst, the Director of Finance,
dated April 15, 2004, that the actions of the City Administrator
pertaining to the execution of the two amendments and the issuance of
payment in accordance therewith be ratified; and
WHEREAS, the City Council desires to approve and ratify the
First Amendment to the Contract, Second Amendment to the Contract, as
executed by the City Administrator, and the payments in accordance
therewith; and
WHEREAS, the City Council of the City of Vernon has
determined that, pursuant to the provisions of subsection (a) of
Section 2.27 of the Vernon City Code, it is in the public interest and
necessity to ratify entering into the First and Second Amendments to
the Contract with Marelich.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The City Council of the City of Vernon hereby
ratifies the execution of the First Amendment to Contract for
Procurement, Construction, and Startup, a copy of which is attached
hereto as Exhibit "A" and made a part hereof.
SECTION 3: The City Council of the City of Vernon hereby
ratifies the execution of the Second Amendment to Contract for
Procurement, Construction, and Startup, a copy of which is attached
hereto as Exhibit "B" and made a part hereof.
- 2 -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17 !,
18 !,
19
20
21
22
23
24
25
26
27
28
SECTION 4: The City Council of the City of Vernon hereby
approves and ratifies the payment of $3,009,756 and $1,891,491 in
accordance with the terms of the Amendments.
SECTION 5: The City Clerk of the City of Vernon shall
certify to the passage of this resolution, and thereupon and
thereafter the same shall be in full force and effect.
APPROVED AND ADOPTED this 21st day of April, 2004.
ATTEST:
zz'��
BRUCE V. MALKENHORST, City Clerk
EONIS C. MAL URG, gayor
- 3 -
1
2
3
4
5
6
7'
811
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution.No.
8435, was duly adopted by the City Council of the City of Vernon at a
regular meeting of the City Council duly held on Wednesday, April 21,
2004, and thereafter was duly signed by the Mayor of the City of
Vernon.
(SEAL)
BRUCE V. MALKENHORST, City Clerk
- 4 -
EXHIBIT
VAL
TRICO CONSTRUCTION 41SSSZSS12 10/27/03 11:10am P. 002
FIRST AMENDMENT
TO
CONTRACT FOR PROCUREMENT, CONSTRUCTION, AND STARTUP
This First Amendment to Contract for Procurement, Construction, and Startup for the
Malburg Generating Station Project, Vernon, California (this "Amendment") is made as of
September 10, 2003 by and between The City of Vernon, a municipal corporation (the "City")
and Marelich Mechanical Co., Inc. dba University Marelich Mechanical & Galliera, Inc. dba
Trico Construction, a Joint Venture (the "Contractor"), and is made with reference to the
following:
A. The City and the Contractor entered into that certain Contract for Procurement,
Construction, and Startup for the Malburg Generating Station Project dated February 3, 2003
(the "Agreement"), pursuant to which the parties agreed that the Contractor would provide for
the procurement, construction and start-up services for the City's development of a Combined
Cycle Power Plant (the "Project"), on the terms and conditions described in the Agreement.
B. The City and the Contractor have agreed that it would be in the best interest of the
Project for the Contractor to perform additional work and provide additional materials and
services in connection with the Project under the terms of the Agreement.
C. Paragraph 6 of the Agreement requires that changes to the Project requiring
expenditures in excess of $20,000 be accomplished by an Amendment to the Agreement. The
additional labor and materials required in connection with the Project will exceed $20,000.
Therefore, to comply with the terms of the Agreement, the City and the Contractor desire to enter
into this Amendment to amend the terms of the Agreement as set forth below. Each initially
capitalized term used in this Amendment without definition shall have the meaning ascribed to
such term in the Agreement.
THEREFORE, for valuable consideration, the parties agree as follows:
1. Additional Services Required. The City and the Contractor acknowledge and
agree that the additional services described in this Paragraph I (collectively, the "Additional
Services") are required in connection with the Project. The Additional Services constitute work
that was not originally contemplated by the parties, and is now determined by the parties to be
necessary to the Project. The Additional Services are:
1.1 Correction and revision of the drawings generated by the City's design
engineers, Power Engineering, Inc.
1.2 Construction of the gas lateral linear.
1.3 Construction of meter skid, onsite abandonment of the existing gas line.
1.4 Additional handling and storage of the CTG, STG and HRSG.
1.5 Establishment of survey control points for the construction layout.
01910/0001 89987.3
TRICO CONSTRUCTION 41SSS28512 10/27/03 11:1Oam P. 003
2. Cost of Additional Services. The City and the Contractor agree that the total cost
for all labor and materials for the Additional Services shall be a lump sum fee of $3,009,756 ( the
"Additional Cost"). The Additional Cost is payable on the terms of the Agreement, following
submission and approval of documentation as required by the Agreement. The City and the
Contractor acknowledge and agree that the Additional Cost for the Additional Services described
in Paragraph 1.1 above constitutes payment for the Contractor's pre -construction services, and
does not include the cost of any additional labor, equipment, or other upgrades that may be
required as a result of the revised drawings.
3. Terms of Additional Services. All Additional Services are to be provided in
accordance with the terms of the Agreement, are to meet the standards and specifications and
quality of work provisions set forth in the Agreement, and are to be covered by the same
warranties or guarantees, if any, that are set forth in the Agreement.
4. Approval by the City. This Amendment shall be executed by a duly authorized
representative of the City following approval of the terms of this Amendment by the City in
accordance with City policies and procedures.
2
01910/0001 89987.3
r
TRICO CONSTRUCTION
41SSS28S12 10/27/03 11:10am P. 004.
5. Remainder of Agreement. Except as specifically modified herein, all terms and
conditions of the Agreement are unmodified and remain in full force and effect, and apply to the
Additional Work and Additional Costs as if those services and costs were originally included in
the Agreement.
Executed as of the date first above written.
APPROVED AS TO FORM
ric T. Fresch, fegal. Counse
LADOCS_89067_I.doe
CITY OF VERNON
Bruce V. Malkenhorst,
City Administrator
CONTRACTOR
Marelich Mechanical Co., Inc. dba University
Marelich Mechanical & Galliera, Inc. dba Trico
Conqk,uction, a Joint Venture
Si tore
Date: /`?,_27` `� 2
Name: L.,;.,- iT � ,� =774"r- e-
Title: Z
By:
S atu
Date: l e' . i 41. a 3
Name: J &0 €.<' ' 2cCsc ;'y "?'A
Title:
EXHIBIT
SECOND AMENDMENT
(to]
CONTRACT FOR PROCUREMENT, CONSTRUCTION. AND STARTUP
This Second Amendment to Contract for Procurement, Construction, and Startup for the
Malburg Generating Station Project, Vernon, California (this "Amendment") is made as of
March 17, 2004 by and between The City of Vernon, a municipal corporation (the "City") and
Marelich Mechanical Co., Inc. dba University Marelich Mechanical & Galliera, Inc. dba Trico
Construction, a Joint Venture (the "Contractor"), and is made with reference to the following:
A. The City and the Contractor entered into that certain Contract for Procurement,
Construction, and Startup for the Malburg Generating Station Project dated February 3, 2003, as
amended on September 10, 2003 (collectively, the "Agreement"), pursuant to which the parties
agreed that the Contractor would provide for the procurement, construction and start-up services
for the City's development of a Combined Cycle Power Plant (the "Project"), on the terms and
conditions described in the Agreement.
B. The City and the Contractor have agreed that it would be in the best interest of the
Project for the Contractor to perform additional work and provide additional materials and
services in connection with the Project under the terms of the Agreement.
C. Paragraph 6 of the Agreement requires that changes to the Project requiring
expenditures in excess of $20,000 be accomplished -by an Amendment to the Agreement. The
additional labor and materials required in connection with the Project will exceed $20,000.
Therefore, to comply with the terms of the Agreement, the City and the Contractor desire to enter
into this Amendment to amend the terms of the Agreement as set forth below. Each initially
capitalized term used in this Amendment without definition shall have the meaning ascribed to
such term in the Agreement.
THEREFORE, for valuable consideration, the parties agree as follows:
1. Additional Services Required. The City and the Contractor acknowledge and
agree that the additional services described in Exhibit "A" to this Agreement, a copy of which is
attached hereto and incorporated herein by this reference (collectively, the "Additional
Services"), are required in connection with the Project. The Additional Services constitute work
that was not originally contemplated by the parties, and is now determined by the parries to be
necessary to the Project. This Amendment is entered into solely for the purpose of evidencing
the City's approval of the cost components of the items listed in Exhibit "A". The parties
specifically acknowledge and agree that this Amendment is not intended to and does not
evidence the City's approval or the Contractor's waiver or settlement of any reference to or
description of or claim in regard to a time delay or schedule impact that may be set forth in any
of the Contractor's cost estimates, whether or not listed in Exhibit "A", all of which are subject
to review and evaluation by the City. Contractor hereby waives any claim that the City's
01910/0001 98038.3
execution of this Amendment or payment of the Additional Cost (as described below) constitutes
the City's express or implied agreement to any reference in any of the Contractor's cost
estimates related to time delays or schedule impacts.
2. Cost of Additional Services. The City and the Contractor agree that the total cost
for all labor and materials for the Additional Services shall be GMP of $1,891,491.00 (the
"Additional Cost!). The Additional Cost is payable on the terms of the Agreement, following
submission and approval of documentation as required by the Agreement.
3. Terms of Additional Services. All Additional Services are to be provided in
accordance with the terms of the Agreement, are to meet the standards and specifications and
quality of work provisions set forth in the Agreement, and are to be covered by the same
warranties or guarantees, if any, that are set forth in the Agreement.
4. Ap rop val by the City. This Amendment shall be executed by a duly authorized
representative of the City following approval of the terms of this Amendment by the City in
accordance with City policies and procedures.
2
01910/0001 98038.3
5. Remainder of Agreement. Except as specifically modified herein, all terms and
conditions of the Agreement are unmodified and remain in full force and effect, and apply to the
Additional Work and Additional Costs as if those services and costs were originally included in
the Agreement.
Executed as of the date first above written.
CITY OF VERNON
By: �i�-'✓1'" .
Bruce V. Malkenhorst,
City Administrator
APPROVED AS TO FORM
Eric T. Fresch, City XtEforney
CONTRACTOR
Marelich Mechanical Co., Inc. dba University
Marelich Mechanical & Galliera, Inc. dba Trico
Construction, a Jg�int Venture
'-- _._-.' Si e (
Date: vLo
Name: ( v
Title: VQ-7,
By:
_(' 'S '- a
Date: '�42 5 10q
Name: JA A-tr,& >g0!QC14k tx-A—
Title: G ! /
01910/0001 98038.3
EXHIBIT A
ADDITIONAL WORK
CE
38
$612,773
Shoring
CE
70
$16,004
Removal of Underground Piping
CE
70B
$3,278
Removal of CS Piping
CE
82
$69,962
Correction to Remediation Trench
CE
96
$193,617
Export soil from Site to 55th Street Lot
CE
100
$1,781
BM Discrepancy Check
CE
02
$12,566
Fuel Gas Heater Upgrade:
CE
02A
$1,528
Certs for Fuel Gas Heater
CE
07
$4,777
Fuel Gas Liquid Waste Drain Tank
CE
09
$200,950
Sales Tax through 09-03-03
CE
09A
$186,331
Sales Tax 09-04-03 through 11-03-03
CE
09B
$11,937
Sales Tax 11-04-03 through 12-03-04
CE
09C
$912
Sales Tax 12-04-03 through 12-31-03
CE
09D
$1,162
Sales Tax 01-01-04 through 01-31-04
CE
12
$33,296
Parshall Flume PO's 008 and 0017
CE
13
$41,113
Alfa Laval Heat Exchanger- Increased Heat Transfer
CE
15
$8,395
Oil Retention Vaults
CE
16
$36,610
CCI Control Valves
CE
23
$12,227
Virginia Transformer Extended Warranty
CE
27
$10,978
Security Fences, Equipment and Personnel
CE
34C
$102,182
Changes Rebar Quantity
CE
35B
$77,055
Conduit Increase-Alstom Drawings
CE
35C
$88,262
Seismic Requirements
CE
70C
$382
Remove Oil Pipe Southside of Jobsite
CE
70D
$4,025
Expose Cut/Cap PVC Pipes
CE
71
$2,204
CCE Trip Hailey
CE
73
$21,573
Locate 3 Bypass Valves at Cooling Tower
CE
73A
$2,507
Earthwork and Survey Existing Water Lines
CE
82A
$22,548
Remediation Trench HRSG #2 out to its Terminus
CE
85
$3,600
Grouting Lube Oil Cooler
CE
86
$9,372
Add Handicap Ramps to Security Trailer
CE
88
$4,388
Removal of Debris and Piping South Side of Site
CE
94
$39,410
Fab Bottom Ring -Two Tanks- Condensate and Raw Water
CE
104
$5,210
ADA Portable Toilets
CE
126
$1,408
Fuel Gas Heater Certs of Compliance
CE
133
$797
Water Tank Usage Delay Time
CE
168
$1,829
FedEx of Alstom Parts
CE
173
$564
Galvanizing Anchor Bolts HRSG Blowdown Tank
CE
173A
$327
Galvanizing 8 Anchor Bolts Ladder Rungs
CE
174
$15,724
Additional Fence Soto and Leonis/2910 50th
CE
182
$6,605
Fab Rings HRSG Stacks
CE
184
$3,160
2-24" Water Lines Removed
CE
185
$4,836
Ramps for Fire Road
CE
265
$828
Remove and Replace Wet Material at GSU's
CE
267
$7,013
Fills for the Ammonia Ramp
CE
268
$5,485
Fill and Compact Ammonia Ramp -
TOTAL $1,891,491.00
LI
01910/0001 98038.3