Loading...
Resolution No. 84671 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 8467 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT NO. ONE TO EQUIPMENT PURCHASE AND PROFESSIONAL SERVICES CONTRACT BY AND BETWEEN THE CITY OF VERNON AND RHINO CONSTRUCTION SERVICES REGARDING THE MALBURG GENERATING STATION PROJECT WHEREAS, the City of Vernon ("City") is constructing a 134 MW Combined Cycle Power Plant, the Malburg Generating Station (the "Malburg Project"), for the purpose of installing additional generating capacity that will yield an efficient, cost-effective, and reliable source of electric generation to the City's inhabitants; and WHEREAS, on July 16, 2003, the City Council of the City of Vernon adopted Resolution No. 8252 with the intention of expediting the purchase of supplies and services for the Malburg Project; and WHEREAS, to facilitate the integration of the Malburg Project into the Vernon electrical system, the City needs to have a cable -tray system designed to house associated cables and circuits being upgraded or replaced at the Vernon Substation (hereinafter "Cable Tray System"); land WHEREAS, the Cable Tray System is needed for the upgrade and/or replacement of electrical equipment, protection systems and various controls panels to improve the effectiveness of the operation of the Malburg Project; and WHEREAS, on March 24, 2004, the City Council of the City of Vernon adopted Resolution No. 8406 approving and authorizing the execution of an Equipment Purchase and Professional Services Contract ("the Contract") with Rhino Construction Services ("Rhino") for ongoing electrical substation maintenance activities during e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Construction of the Malburg Project for fiscal year 2003/2004; and WHEREAS, on or about April 7, 2004, Rhino provided the City with Proposal No. RCS-4-84-REV-2 to provide the Cable Tray System; and WHEREAS, the City desires to expand the existing scope of services with Rhino to provide for the design, delivery, installation, testing and support services for the Cable -Tray System and to modify the compensation and time of performance accordingly; and WHEREAS, in accordance with Section 14.K of the Contract, the City of Vernon and Rhino desire to amend the Contract to incorporate changes to the scope of services and the adjustment of compensation and completion time required therefor; and WHEREAS, on June 8, 2004, the Finance Committee considered the recommendation of Bruce V. Malkenhorst, Director of Finance, dated June 3, 2004, that Amendment No. One to the existing Contract with Rhino be approved; and WHEREAS, the City Council of the City of Vernon has determined that, pursuant to the provisions of subsection (a) of Section 2.27 of the Vernon City Code, it is in the public interest and necessity to enter into an amendment with Rhino. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true land correct. SECTION 2: The City Council of the City of Vernon hereby approves the Amendment No. One to Equipment Purchase and Professional Services Contract with Rhino Construction Services, a copy of which is attached hereto and incorporated herein by reference as Exhibit A. - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 3: The City Council of the City of Vernon hereby authorizes the Mayor and the City Clerk to execute said Amendment for, and on behalf of, the City of Vernon. SECTION 4: The City Council of the City of Vernon hereby directs the City Clerk, or his designee, to send one fully executed Amendment to: Rhino Construction Services Attn. James Megorden 2672 Kempton Drive Los Alamitos, CA 90720 SECTION 5: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 16th day of June, 2004. ATTEST: BRUCE V. MALKENHORST, City Clerk EONIS C. MALEbRG, Malryor - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 8467, was duly adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Wednesday, June 16, 2004, and thereafter was duly signed by the Mayor of the City of Vernon. (SEAL) Z<-155" — i BRUCE V. MALKENHORST, City Clerk - 4 - EXHIBIT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AMENDMENT NO. ONE TO EQUIPMENT PURCHASE AND PROFESSIONAL SERVICES CONTRACT THIS AMENDMENT NO. ONE TO THE EQUIPMENT PURCHASE AND PROFESSIONAL SERVICES CONTRACT is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this day of June, 2004, in the City of Vernon, County of Los Angeles, California, BY AND BETWEEN THE CITY OF VERNON, (hereinafter referred to as %%City") 4305 Santa Fe Avenue Vernon, California 90058 I m l RECITALS RHINO CONSTRUCTION SERVICES (hereinafter referred to as "Rhino") 2672 Kempton Drive Los Alamitos, CA 90720 WHEREAS, the City and Rhino entered into an Equipment Purchase and Professional Services Contract dated March 24, 2004 (hereinafter referred to as the "Contract"), under which Rhino was to provide ongoing electrical substation maintenance activities during construction of the Malburg Generating Station Combined Cycle Power Plant at 2715 E. 50th Street in the City (hereinafter referred to as t "Malburg Project") throughout the fiscal year 2003/2004; and WHEREAS, the City and Rhino desire to amend the Contract to modify the scope of services provided by Rhino to include the design of a cable -tray system to house associated cables and circuits being upgraded or replaced at the Vernon Substation in order to integrate the Malburg Project into the Vernon electrical system (70-VS/MGS Protection 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Control Panels) (hereinafter "Cable Tray System"), modify the compensation to reflect the additional cost for the Cable Tray System to a sum not to exceed Fifty -Two Thousand Eight Hundred Seventy -Five Dollars and No Cents ($52,875.00, and modify the time of performance to reflect the additional tasks); and WHEREAS, the Cable Tray System is needed for the upgrade and/or replacement of electrical equipment, protection systems and various control panels to improve the effectiveness of the operation of the Malburg Project; and WHEREAS, Section 14.K of the Contract allows for amendments and modifications to the Contract. NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET FORTH HEREIN: SECTION l: The following language shall be added to Section 1, Scope of Services: Under this Amendment No. One, Rhino agrees to design, deliver, install, test and provide support services for a cable -tray system to house associated cables and circuits being upgraded or replaced at the Vernon Substation (70-VS/MGS Protection Control Panels) as set forth and described in detail in the Proposal dated April 7, 2004 (the "Proposal"), which is attached hereto and incorporated herein by reference as Exhibit A. The tasks to be performed include: 1. Provide and install new Type 12B aluminum cable tray system from the east end of the basement to the existing and future equipment locations between column lines 9 thru 13 as indicated on drawings. 2. Provide coordination of the installation to maximize future cable installations. - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. Provide and install unistrut support racks with appropriate seismic restraint for Zone 4 to support the new cable tray system. 4. Provide dividers within the cable tray system to provide separation as needed for future cable installations. 5. Provide CAD drawings indicating as -built installation. SECTION 2: The following language shall be added to Section 2, Time of Performance: Rhino's time of performance under Amendment No. One shall commence upon the full execution of this Amendment No. One and shall continue until October 1, 2004, unless the Contract is otherwise terminated or extended. SECTION 3: The following language shall be added to Section 3, Compensation• Under this Amendment No. One, City will pay Rhino for the Cable Tray System a sum not to exceed Fifty -Two Thousand Eight Hundred Seventy -Five Dollars and No Cents ($52,875.00), in accordance with the Proposal. SECTION 4: In all other respects, the terms and conditions of the Contract shall be renewed in its entirety. - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, City and Rhino have executed this Amendment as of the date first hereinabove set forth. ATTEST: BRUCE V. MALKENHORST, City Clerk JAPPROVED AS TO FORM: IERIC T. FRESCH, City Attorney By: CITY OF VERNON LEONIS C. MALBURG, Mayor RHINO CONSTRUCTION SERVICES Title. By: Title. - 4 - EXHIBIT VI& utno �nns�r�u icr n GENERAL BUILDING & ELECTRICAL CONTRACTOR �. 2672 Kempton Drive, Los. Alamitos CA 90720 Date: April 7, 2004 Phone:562-773-9045 Fax 562-594-7466 B, C-10, License: 812470 To: City of Vernon Attention Mr. Otis Smith 1-323-583-8811 FAX 1-323-585-1425 PROPOSAL: RCS-448441EV 2: Vernon Station control & relay cable tray system Overview: Provide all labor, material and equipment to instal new aluminum cable tray system Type 12B based on provided drawings and specifications; to allow future conductors to enter the basement from the existing conduit stubs connected to the existing cable trend which wig provide a pathway to the SEL control & relay cabinets and to the new and existing control room equipment locations. Scope: 1. Provide and install new Type 12B aluminum cable tray system from the east end of the basement to the existing and future equipment locations between column lines 9 thru 13 as indicated on drawings. 2. Provide coordination of the installation to maximize future cable Installations. 3. Provide and install unistrut support -racks with appropriate seismic restraint for Zone 4 to support the new cable tray'system. 4. Provide dividers within the cable tray system to provide separation as needed for future cable installations. 5. Provide CAD drawings indicating as -built Installation. We propose to fumish required installation complete In accordance with the above scope items 1 through 5 as Indicated for Fifty Two Thousand Eight Hundred Seventy Five and 00/100 dollars ($52,875.00). `L Rhino Construction Services thanks you for the opportunity to provide a proposal to quote this scope of work for the City of Vernon. Ali materials guaranteed to be -as specified as indicated above. Al work performed by RHINO CONSTRUCTION SERVICES and SUBCONTRACTORS 'is to be performed in a workmanlike manner, per 1999 NEC and NEMA VE-1 standard; according to the specifications submitted and per standard practices. Any aleration or deviation from the above specifications involving extra costs may become an extra charge over and above the estimate, which will only be executed upon written change order. This proposal includes no agreements for contingency such as strikes, accidents, or delays beyond our control. Our workers are fully covered by Workmen's Compensation Insurance. If either party commences legal action to enforce its rights pursuant to this agreement the prevailing party in said legal action shall be entitled to recover reasonable attomey's fees and costs of litigation relating to said legal action as determined by a court of competent jurisdiction. Authorized Signature: NOTE This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL RCS-4-84-REV-2: Vernon Station control & relay cable tray The above -mentioned prices, specifications and conditions ate satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment for said work will be made as outlined above. Signature (of owner or authorized representative): Signature (of James Megorden — Rhino Construction Services) Date of acceptance: SUPPORTING DOCUMENTS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 19 20 21 22 23 24 25 26 27 28 AMENDMENT NO. ONE TO EQUIPMENT PURCHASE AND PROFESSIONAL SERVICES CONTRACT THIS AMENDMENT NO. ONE TO THE EQUIPMENT PURCHASE AND PROFESSIONAL SERVICES CONTRACT is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this 2.e day of June, 2004, in the City of Vernon, County of Los Angeles, California, BY AND BETWEEN THE CITY OF VERNON, (hereinafter referred to as "City") 4305 Santa Fe Avenue Vernon, California 90058 AND RHINO CONSTRUCTION SERVICES (hereinafter referred to as "Rhino") 2672 Kempton Drive Los Alamitos, CA 90720 RECITALS WHEREAS, the City and Rhino entered into an Equipment Purchase and Professional Services Contract dated March 24, 2004 (hereinafter referred to as the "Contract"), under which Rhino was to provide ongoing electrical substation maintenance activities during construction of the Malburg Generating Station Combined Cycle Power Plant at 2715 E. 50th Street in the City (hereinafter referred to as the "Malburg Project") throughout the fiscal year 2003/2004; and WHEREAS, the City and Rhino desire to amend the Contract to modify the scope of services provided by Rhino to include the design of a cable -tray system to house associated cables and circuits being upgraded or replaced at the Vernon Substation in order to integrate the Malburg Project into the Vernon electrical system (70-VS/MGS Protection, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Control Panels) (hereinafter "Cable Tray System"), modify the compensation to reflect the additional cost for the Cable Tray System to a sum not to exceed Fifty -Two Thousand Eight Hundred Seventy -Five Dollars and No Cents ($52,875.00, and modify the time of performance to. reflect the additional tasks); and WHEREAS, the Cable Tray System is needed for the upgrade and/or replacement of electrical equipment, protection systems and various control panels to improve the effectiveness of the operation of the Malburg Project; and WHEREAS, Section 14.K of the Contract allows for amendments and modifications to the Contract. NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET FORTH HEREIN: SECTION 1: The following language shall be added to Section 1, Scope of Services: Under this Amendment No. One, Rhino agrees to design, deliver, install, test and provide support services for a cable -tray system to house associated cables and circuits being upgraded or replaced at the Vernon Substation (70-VS/MGS Protection Control Panels)', as set forth and described in detail in the Proposal dated April 7, 2004 (the "Proposal"), which is attached hereto and incorporated herein, by reference as Exhibit A. The tasks to be performed include: 1. Provide and install new Type 12B aluminum cable tray system from the east end of the basement to the existing and future equipment locations between column lines 9 thru 13 as indicated on drawings. 2. Provide coordination of the installation to maximize future cable installations. - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, City and Rhino have executed this Amendment as of the date first hereinabove set forth. ATTES % v BRUCE V. MALKENHORST, City Clerk APPROZ AS TO RM: ERIC T. FRE CH, City Attorney CITY OF VERNON By: EONIS C. MAL RG, Mayor RHINO CONSTRUCTION SERVICES By: Title: Title: "fjc - 4 - mino ronSTRUffillff GENERAL BUILDING & ELECTRICAL CONTRACTOR �. 2672 Kempton Drive, Los. Alamitos CA 90720 Date: April 7, 2004 Phone:562-773-9045 Fax 562-594-7466 B, C-10, License: 812470 To: City of Vernon Attention Mr. Otis Smith 1-323-583-8811 - FAX 1-323-585-1425 PROPOSAL: RCS-4-84-REV-2: Vernon Station control & relay cable tray system Overview: Provide all labor, material and equipment to Install new aluminum cable tray system Type 12B based on provided drawings and specifications to allow future conductors to enter the basement from the existing conduit stubs connected to the existing cable trench which will provide a pathway to the SEL control 8 relay cabinets and to the new and existing control room equipment locations. Scope: 1. Provide and install new Type 12B aluminum cable tray system from the east end of the basement to the existing and future equipment locations between column lines 9 thru 13 as indicated on drawings. 2. Provide coordination of the installation to maximize future cable Installations. 3. Provide and install unistrut support racks with appropriate seismic restraint for Zone 4 to support the new cable tray system. 4. Provide dividers within the cable tray system to provide separation as needed for future cable installations. 5. Provide CAD drawings indicating as -built installation. We propose to furnish required installation complete in accordance with the above scope items 1 through 5 as indicated for Fifty Two Thousand Eight Hundred Seventy Five and 00/100 dollars (a52,875.00). Rhino Construction Services thanks you for the opportunity to provide a proposal to quote this scope of work for the City of Vernon. AN materials guaranteed to be -as speed as indicated above. All work performed by RHINO CONSTRUCTION SERVICES and SUBCONTRACTORS is to be performed in a workmanlike manner, per 1999 NEC and NEMA VE-1 standard; according to the specifications submitted and per standard practices. Any alteration or deviation from the above specifications involving extra costs may become an extra charge over and above the estimate, which will only be executed upon written change order. This proposal includes no agreements for contingency such as strikes, accidents, or delays beyond our control. Our workers are fully covered by Workmen's Compensation Insurance. If either party commences legal action to enforce its rights pursuant to this agreement the prevailing party in said legal action shall be entitled to recover reasonable attorney's fees and costs of litigation relating to said legal action as determined by a court of competent jurisdiction. Authorized Signature: NOTE: This proposal may be withdrawn by us If not accepted within 30 days. ACCEPTANCE OF PROPOSAL: RCS-4-84-REV-2: Vernon Station control & relay cable tray The above -mentioned prices, specifications and conditions ate satisfactory and are hereby accepted. You are authorized to do the work as specified. Payment for said work will be made as outlined above. Signature (of owner or authorized representative): Signature (of James Megorclen — Rhino Construction Services) Date of acceptance: