RESOLUTION NO. 8505
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON APPROVING AND AUTHORIZING THE EXECUTION OF
AN AMENDMENT NO. THREE TO AGREEMENT FOR
PROFESSIONAL CONSULTING SERVICES BY AND BETWEEN THE
CITY OF VERNON AND RAYMUNDO ENGINEERING CO., INC.
REGARDING GAS DISTRIBUTION SYSTEM
WHEREAS, on June 20, 2001, the City Council of the City of
Vernon adopted Resolution No. 7792 approving and authorizing the
execution of an Agreement for Professional Consulting Services (the
"Agreement") with Raymundo Engineering Company, Inc. ("Raymundo") for
engineering technical support for the gas distribution system; and
WHEREAS, on July 3, 2002, the City Council of the City of
Vernon adopted Resolution No. 7996 approving and authorizing the
execution of Amendment No. One to the Agreement with Raymundo to extend
the Agreement to June 30, 2003; and
WHEREAS, on June 18, 2003, the City Council of the City of
Vernon adopted Resolution No. 8216 approving and authorizing the
execution of Amendment No. Two to the Agreement with Raymundo to extend
the Agreement to June 30, 2004, and to increase the annual compensation
under the Agreement to a sum not to exceed $50,000.00; and
WHEREAS, in accordance with Section ll.G of the Agreement,
the City of Vernon and Raymundo desire (i) to extend the Agreement
through and including June 30, 2005, with the same annual compensation
of a sum not to exceed $50,000.00; (ii) to increase the scope of work
to include tasks relating to the SCADA system equipment substitution by
contractor; preconstruction and construction phase support; preliminary
work only for testing, commissioning, project completion and closure
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
support; provide chief building official review and Pipeline Integrity
Management Plan; and (iii) to increase the compensation provisions to
reflect the additional cost of performing the aforementioned extra
tasks for a not to exceed amount of $115,750.00, for a total
compensation of not to exceed $165,750.00; and
WHEREAS, on July 27, 2004, the Finance Committee considered
the recommendation of Bruce V. Malkenhorst, Director of Finance, dated
July 22, 2004, that an amendment to the Agreement be approved and
executed.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The City Council of the City of Vernon hereby
approves the Amendment No. Three to the Agreement for Professional
Consulting Services with Raymundo, a copy of which is attached hereto
as Exhibit A and incorporated by reference.
SECTION 3: The City Council of the City of Vernon hereby
authorizes the Mayor and the City Clerk to execute said Amendment for,
and on behalf of, the City of Vernon.
SECTION 4: The City Council of the City of Vernon hereby
directs the City Clerk, or his designee, to send one fully executed
Amendment to:
RAYMUNDO ENGINEERING COMPANY, INC.
ATTN: WILLIAM L. RAYMUNDO, PRESIDENT
488 N. WIGET LANE
WALNUT CREEK, CA 94598
- 2 -
r
s
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
SECTION 5: The City Clerk of the City of Vernon shall
certify to the passage of this resolution, and thereupon and
thereafter the same shall be in full force and effect.
APPROVED AND ADOPTED this 4th day of August, 2004.
[ATTEST:
BRUCE V. MALKENHORST, City Clerk
(LEONIS C. MALBURG, f4ayor
- 3 -
It
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution No.
8505, was duly adopted by the City Council of the City of Vernon at a
regular meeting of the City Council duly held on Wednesday, August 4,
2004, and thereafter was duly signed by the Mayor of the City of
Vernon.
(SEAL)
BRUCE V. MALKENHORST, City Clerk
- 4 -
EXHIBIT
1 AMENDMENT NO. THREE TO THE AGREEMENT FOR
2 PROFESSIONAL CONSULTING SERVICES
3
4 THIS AMENDMENT NO. THREE TO THE AGREEMENT FOR PROFESSIONAL
5 CONSULTING SERVICES is made, entered into and executed in duplicate
6 originals, either copy of which may be considered and used as the
7 original hereof for all purposes, as of this 4th day of August, 2004,
8 in the City of Vernon, County of Los Angeles, California
9 BY AND BETWEEN THE CITY OF VERNON
10 (hereinafter referred to as
the "City")
11 4305 Santa Fe Avenue
Vernon, CA 90058
12 AND RAYMUNDO ENGINEERING COMPANY,
13 INC. (hereinafter referred
to as "Consultant")
14 488 N. Wiget Lane
Walnut Creek, CA 94598
15 RECITALS
16
WHEREAS, the City and Consultant are parties to an Agreement
17 for Professional Services dated on or about June 20, 2001 (hereinafter
18 referred to as the "Agreement") for en
g gineering technical support for
19 a gas distribution system; and
20 WHEREAS, the Cityand Consultant are parties to an Amendment
21 No. One to the Agreement dated on or about July 3, 2002, that extended
22 said Agreement through and including June 30, 2003; and
23 WHEREAS, the City and Consultant are parties to an Amendment
24 No. Two to the Agreement dated on or about June 18, 2003, that
25 extended the Agreement through and including June 30, 2004; and
26 WHEREAS, City and Consultant desire to amend the Agreement
27 to extend the term of the Agreement for another year, through and
28 including June 30, 2005; and
1 WHEREAS, Consultant's annual compensation under the
2 Agreement, as amended, was for a sum not to exceed $50,000.00; and
3 WHEREAS, the City and Consultant desire to modify the
4 Agreement (I) to increase the scope of work to include the following
5 tasks and subtasks: Task 1-revise drawings to reflect SCADA system
6 equipment substitution by contractor; Task 2-provide preconstruction
7 and construction phase support; Tasks 3 and 4-provide preliminary work
8 only on testing, commissioning, project completion and closure
9 support; Task 5-provide CBO review; and Task 6-development of a
10 Pipeline Integrity Management Plan for the City's 10 inch Natural Gas
11 Transmission Pipeline or other system commissioning services as
12 necessary; and (II) to increase the compensation to be paid for the
13 additional scope of work to a sum not to exceed $115,750.00; and
14 WHEREAS, Section 6 of the Agreement allows for changes and
15 additions to the services to be performed by Consultant, the scope of
161 the Agreement and the adjustment of compensation and completion time
17 required thereof; and
18 WHEREAS, Section ll.G of the Agreement provides for
19 amendments and modifications to the Agreement.
20 NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET
21 FORTH HEREIN:
22 SECTION 1: In addition to the services outlined in Section
23 1 of the Agreement entitled SCOPE OF SERVICES, Consultant shall
24 perform the services described in Exhibit A-1 which is attached hereto
25 and incorporated by reference on a time and material basis.
26 SECTION 2: Section 3 of the Agreement entitled TIME OF
27 PERFORMANCE is hereby amended to read as follows:
28
- 2 -
1 Consultant's services shall be extended from June 30,
2 2004. The extension period will commence on July 1,
3 2004 and shall continue until June M, 2005, unless the
4 Agreement is terminated or extended.
5 SECTION 3: In addition to the compensation to be paid
6 to Consultant outlined in the COMPENSATION section of the
7 Agreement, as amended, the City will pay Consultant for the
8 additional tasks and subtasks to be performed under this
9 Amendment No. Three a sum not to exceed One Hundred Fifteen
10 Thousand Seven Hundred Fifty Dollars and No Cents ($115,750.00).
11 Any other expenses for work identified in this Amendment No.
12 Three may only be billed if advance written approval has been
13 obtained from the City Administrator.
14 SECTION 4: In all other respects, the terms and conditions
15 of the Agreement, as amended, shall be renewed in its entirety.
16
17
18
19
20
21
22
23
24
25
26
27
28
- 3 -
1
2
3
4
5
6
7
8
9
10
11
12
13
141
15
16
17
18
19
20
21
22
23
24
25
26
27
28
IN WITNESS WHEREOF, the parties have caused this Amendment
to be executed by and through their authorized officers on the date,
month and year first written above.
I ATTEST:
BRUCE V. MALKENHORST, City Clerk
APPROVED AS TO FORM:
ERIC T. FRESCH, City Attorney
CITY OF VERNON
By:
LEONIS C. MALBURG, Mayor
RAYMUNDO ENGINEERING COMPANY, INC.
By:
Title:
By:
Title:
- 4 -
EXHIBIT
1
2
3
4
5
6
7
8.
9
10
11
12
13
14
15
16
17
18
19
20
21
22
231
24
25
26
27
28
EXHIBIT A-1
COST ESTIMATE OF SCOPE OF SERVICES AND COSTS
TASK 1.0: Revise drawings to reflect SCADA system equipment substitution by contractor
1.1: Discuss w/City & contractor the objectives for the substitution
1.2: Request & review PO & specifications for substitute SCADA equip
1.3: Discuss new system w/vendor & request installation manuals
IA: Revise PO as required
1.5: Review submittals from vendor
1.6: Revise existing drawings
101 Drawing Index
112A P&ID
112B P&ID
112C P&ID
112E P&ID
126 Aux & Control Piping - Plan
127D Aux & Control Piping - Details
128s1 Aux & Control Piping - Bill of Mat'l
131B Electrical - Elementary Diagram, AC/DC Power Supplies & Dist.
131E Electrical - Elementary Diagram, SCADA & Communications
131F Electrical - Elementary Diagram, Flow Computer
131G Electrical - Elementary Diagram, Flow Computer
131 H Electrical - Elementary Diagram, RTU
131I Electrical - Elementary Diagram, GC
133 Power & Controls, Electrical - Plan
134A Power & Controls, Electrical - Section & Details
134C Power & Controls, Electrical - Section & Details
134D Power & Controls, Electrical - Section & Details
135 Power & Controls, Electrical - Bill of Materials
136s1 Power & Controls, Electrical - Connection Diagram
136s2 Power & Controls, Electrical - Connection Diagram
136s4 Power & Controls, Electrical - Connection Diagram
136s5 Power & Controls, Electrical - Connection Diagram
136s6 Power & Controls, Electrical - Connection Diagram
137 Power & Controls. Electrical - Circuit Schedule
1.7: Review & approve drawings for client review
1.8: Incorporate client's comments
1.9: Approve & issue drawings for CBO review
1.10 Incorporate CBO comments, approve & issue drawings for construction
Task 1 Subtotal for Services and Expenses
$ 13,000.00
.51
1
2
3
4
5
6
7
8
9
10
11
12
13'
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
TASK 2.0: Provide Preconstruction & Construction Phase Support
2.1: Review & research submittals & RFIs prior to 10/30/03
2.2: Review & research submittals & RFIs after 10/30/03
2.3: Discuss w/ vendor/contractor when applicable .
2.4: Prepare response to submittals & RFIs, update logs
2.5: Approve & issue to City/WRMS
2.6: Assist Vernon Project Manager resolve const issues & respond to inquiries
2.7: Observe work in progress for compliance with plans & specifications
Task 2 Subtotal for Services and Expenses $ 42,000.00
TASK 3
and 4: Preliminary Testing and Commissioning Phase Support and Preliminary Project
Completion and Closure Support
Task 3 and 4 Subtotal for Services and Expenses $ 750.00
TASK 5.0: CBO review of Tasks 1-4
5.1: Investigate and review CBO comments
5.2: Prepare and discuss responses
5.3: Perform calculations for all standard equipment
5.4: Incorporate all approved changes to the following drawings:
MGS-D-P-123
MGS-D-C-162
MGS-D-C-163
MGS-D-P-124
MGS-D-E-134D
GS-D-J-118
GS-D-P-1203
5.5: Submit bid item #1 for CBO approval
5.6: Submit bid item #2 for CBO approval
5.7: Sign two sets of drawings for each bid package
5.8: Reproduce 4 sets of signed drawings for each bid package
5.9: Mail 6 sets of drawings for each bid package
Task 5 Subtotal for Services and Expenses $-30,000.00
A-2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16'
17
18
19
20
21
22
23
24
25
26
27
28
TASK 6.0
Develop Pipeline Integrity Management Plan for Vernon's 10" Natural Gas Transmission
Pipeline
6.1: Review pipeline integrity management rules
6.1.1: Identify regulatory requirements and timelines
6.1.2: Define work plan and data gathering requirements
6.2: Identify High Consequence Areas (HCAs)
6.2.1: Calculate Potential Impact Radius
6.2.1.1: Examine aerial photos for occupied buildings
6.2.1.2: Perform pipeline survey
6.2.2: Catalog "Identified Sites" within HCA's
6.2.2.1: Check with local emergency planning commissions and agencies
6.2.2.2: Perform pipeline survey
6.3: Map gas system using ArcView GIS software
6.4: Prepare cost estimate for drafting written plan (Phase 2)
6.5: Prepare cost estimate for implementation (Phase 3)
6.6: Such other system commissioning services as necessary
Task 6 Subtotal for Services and Expenses
SUMMARY:
TASK 1:
$13,000.00
TASK 2:
$42,000.00
TASK 3 AND 4:
$ 750.00
TASK 5:
$30,000.00
TASK 6:
$30,000.00
$ 30,000.00
$115,750.00
Costs include travel expenses (transportation, photos, meals, auto rental), plotting, printing, and
telephones.
Auto Rental: $65/day including gas
Plotfiles: $6/plot (2406); $3/plot (l 1x17)
Prints: $1.25 (2406); $.50 (11x17)
FedEx: $25-$45/pkg. Depending on weight
Airfare: $176/tix roundtrip (Oak - Bur)
Hotel: $150/night
Meals: $50/day
Costs exclude full time field inspector
A-3
RAYMUNDO ENGINEERING COMPANY, INC.
LABOR AND EXPENSE RATE SCHEDULE
The following billing rates are effective through December 31, 2004.
Rates are subject to adjustment annually on January 1'.
LABOR
HOURLY RATE
Principal
$ 130.00
William L. Raymundo
Supervising Engineer
$ 115.00
James Dong (Gas Processing)
John Byrne (Stations and Pipelines)
Senior Engineer
$ 105.00
. Bernard B. Wroblewski (Civil)
Engineer
$ 90.00
Karli Maeda
Designer
$ 75.00
Senior CAD Specialist
$ 65.00
Cristina M. Raymundo
CAD Specialist
$ 55.00
Nikica Favretto
Stephen Jung
Technical Assistant
$ 45.00
Lauren Raymundo
Philip Cullinen
Secretary
$ 40.00
Clerical
$ 35.00
Melissa Urroz
Chief Inspector
$ 82.00
Carl K. Whatley
Inspector
$ 76.00
Expenses
Federal. Per Diem Rate
Equipment (Truck)
$ 10.00
Cellular Phone Service
At Cost
Auto Mileage (Prevailing IRS rate) $0.36/mile
Auto Rental and Gas $50.00/d
Meals $30 ay
Films and Prints (24 Exposure) .00/roll
Express Mailing 13.00/package
Plotfile
24X36 sheet $7.00/sheet
I IX17 sheet $3.50/sheet
2 sheet $1.25/sheet
rIX17 sheet $0.45/sheet
Vellum sheet (24X36) $7.00/sheet
a
A - 4
SUPPORTING
DOCUMENTS
t
1 AMENDMENT NO. THREE TO THE AGREEMENT FOR
2 PROFESSIONAL CONSULTING SERVICES
3
4 THIS AMENDMENT NO. THREE TO THE AGREEMENT FOR PROFESSIONAL
5 CONSULTING SERVICES is made, entered into and executed in duplicate
6 originals, either copy of which may be considered and used as the
7 original hereof for all purposes, as of this 4th day of August, 2004,
8 in the City of Vernon, County of Los Angeles, California
9 BY AND BETWEEN THE CITY OF VERNON
10 (hereinafter referred to as
the "City")
11 4305 Santa Fe Avenue
Vernon, CA 90058
12 AND RAYMUNDO ENGINEERING COMPANY,
13 INC. (hereinafter referred
to as "Consultant")
14 488 N. Wiget Lane
Walnut Creek, CA 94598
15 RECITALS
16
WHEREAS, the City and Consultant are parties to an Agreement
17 for Professional Services dated on or about June 20, 2001 (hereinafter
18 referred to as the "Agreement") for engineering technical support for
19 a gas distribution system; and
20 WHEREAS, the City and Consultant are parties to an Amendment
21 F; N.o. One to the Agreement dated on or about July 3, 2002, that extended
221. said Agreement through and including June 30, 2003; and
23 WHEREAS, the City and Consultant are parties to an Amendment
24 No. Two to the Agreement dated on or about June 18, 2003, that
25 extended the Agreement through and including June 30, 2004; and
26 WHEREAS, City and Consultant desire to amend the Agreement
27 to extend the term of the Agreement for another year, through and
28 including June 30, 2005; and
0
1 WHEREAS, Consultant's annual compensation under the
2 Agreement, as amended, was for a sum not to exceed $50,000.00; and
3 WHEREAS, the City and Consultant desire to modify the
4 Agreement (I) to increase the scope of work to include the following
5 tasks and subtasks: Task 1-revise drawings to reflect SCADA system
6 equipment substitution by contractor; Task 2-provide preconstruction
7 and construction phase support; Tasks 3 and 4-provide preliminary work
8 only on testing, commissioning, project completion and closure
9 support; Task 5-provide CBO review; and Task 6-development of a
10 Pipeline Integrity Management Plan for the City's 10 inch Natural Gas
11 Transmission Pipeline or other system commissioning services as
12 necessary; and (II) to increase the compensation to be paid for the
13 additional scope of work to a sum not to exceed $115,750.00; and
14 WHEREAS, Section 6 of the Agreement allows for changes and
15 additions to the services to be performed by Consultant, the scope of
16 the Agreement and the adjustment of compensation and completion time
17 required thereof; and
18 WHEREAS, Section ll.G of the Agreement provides for
19 amendments and modifications to the Agreement.
20 NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET
21 JORTH HEREIN:
22 SECTION 1: In addition to the services outlined in Section
23 1 of the Agreement entitled SCOPE OF SERVICES, Consultant shall
24 perform the services described in Exhibit A-1 which is attached hereto
25 and incorporated by reference on a time and material basis.
26 SECTION 2: Section 3 of the Agreement entitled TIME OF
27 PERFORMANCE is hereby amended to read as follows:
28 / /
- 2 -
I Consultant's services shall be extended from June 30,
2 2004. The extension period will commence on July 1,
3 2004 and shall continue until June 30, 2005, unless the
4 Agreement is terminated or extended.
5 SECTION 3: In addition to the compensation to be paid
6 to Consultant outlined in the COMPENSATION section of the
7 Agreement, as amended, the City will pay Consultant for the
8 additional tasks and subtasks to be performed under this
9 Amendment No. Three a sum not to exceed One Hundred Fifteen
10 Thousand Seven Hundred Fifty Dollars and No Cents ($115,750.00).
11 Any other expenses for work identified in this Amendment No.
12 Three may only be billed if advance written approval has been
13 obtained from the City Administrator.
14 SECTION 4: In all other respects, the terms and conditions
15 of the Agreement, as amended, shall be renewed in its entirety.
16
17
18
19
20
21
22
23
24
25
26
27
28
- 3 -
1 IN WITNESS WHEREOF, the parties have caused this Amendment
2 to be executed by and through their authorized officers on the date,
3 month and year first written above.
4 CITY OF VERNON
5 '
By:
6 L ONIS C. MALBU , Ma or Y
7 ATTEST:
8
BRUCE V. MALKENHORST, City Clerk
9
10 APPROVED AS TO RM:
11
12 ERIC T. FRE C , City Attorney
13 RAYMUNDO ENGINEERING COMPANY, INC.
14
15
16 Title: PRESIDENT
17 Avw a0t,
18 By:
19 Title: CORPORATE SEC-TREAS
20
21
22
23
24
25
26
27
28
- 4 -
EXHIBIT
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
11
EXHIBIT A-1
COST ESTIMATE OF SCOPE OF SERVICES AND COSTS
TASK 1.0: Revise drawings to reflect SCADA system equipment substitution by contractor
1.1: Discuss w/City & contractor the objectives for the substitution
1.2: Request & review PO & specifications for substitute SCADA equip
1.3: Discuss new system w/vendor & request installation manuals
1.4: Revise PO as required
1.5: Review submittals from vendor
1.6: Revise existing drawings
101 Drawing Index
112A P&ID
112B P&ID
112C P&ID
112E P&ID
126 Aux & Control Piping - Plan
127D Aux & Control Piping - Details
128sl Aux & Control Piping - Bill of Mat'l
131B Electrical - Elementary Diagram, AC/DC Power Supplies & Dist.
131E Electrical - Elementary Diagram, SCADA & Communications
131F Electrical - Elementary Diagram, Flow Computer
131 G Electrical - Elementary Diagram, Flow Computer
131H Electrical - Elementary Diagram, RTU
131I Electrical - Elementary Diagram, GC
133 Power & Controls, Electrical - Plan
134A Power & Controls, Electrical - Section & Details
134C Power & Controls, Electrical - Section & Details
134D Power & Controls, Electrical - Section & Details
135 Power & Controls, Electrical - Bill of Materials
136s1 Power & Controls, Electrical - Connection Diagram
136s2 Power & Controls, Electrical - Connection Diagram
136s4 Power & Controls, Electrical - Connection Diagram
136s5 Power & Controls, Electrical - Connection Diagram
136s6 Power & Controls, Electrical - Connection Diagram
137 Power & Controls. Electrical - Circuit Schedule
1.7: Review & approve drawings for client review
1.8: Incorporate client's comments
1.9: Approve & issue drawings for CBO review
1.10 Incorporate CBO comments, approve & issue drawings for construction
Task 1 Subtotal for Services and Expenses
$ 13,000.00
A-1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
TASK 6.0: Develop Pipeline Integrity Management Plan for Vernon's 10" Natural Gas Transmission
Pipeline
6.1: Review pipeline integrity management rules
6.1.1: Identify regulatory requirements and timelines
6.1.2: Define work plan and data gathering requirements
6.2: Identify High Consequence Areas (HCAs)
6.2.1: Calculate Potential Impact Radius
6.2.1.1: Examine aerial photos for occupied buildings
6.2.1.2: Perform pipeline survey
6.2.2: Catalog "Identified Sites" within HCA's
6.2.2.1: Check with local emergency planning commissions and agencies
6.2.2.2: Perform pipeline survey
6.3: Map gas system using ArcView GIS software
6.4: Prepare cost estimate for drafting written plan (Phase 2)
6.5: Prepare cost estimate for implementation (Phase 3)
6.6: Such other system commissioning services as necessary
Task 6 Subtotal for Services and Expenses
SUMMARY:
TASK 1:
$13,000.00
TASK 2:
$42,000.00
TASK 3 AND 4:
$ 750.00
TASK 5:
$30,000.00
TASK 6:
$30,000.00
$ 30,000.00
$115,750.00
Costs include travel expenses (transportation, photos, meals, auto rental), plotting, printing, and
telephones.
Auto Rental: $65/day including gas
Plotfiles: $6/plot (24x36); $3/plot (l 1xl7)
Prints: $1.25 (2406); $.50 (1lx17)
FedEx: $25-$45/pkg. Depending on weight
Airfare: $176/tix roundtrip (Oak - Bur)
Hotel: $150/night
Meals: $50/day
Costs exclude full time field inspector
F� c
RAYMUNDO ENGINEERING COMPANY INC
LABOR AND EXPENSE RATE SCHEDULE
The following billing rates are effective through December 31, 2004.
Rates are subject to adjustment annually on January lac
LABOR
HOURLY RATE
Principal
$ 130.00
William L. Raymundo
Supervising Engineer
$ 115.00
James Dong (Gas Processing)
John Byrne (Stations and Pipelines)
Senior Engineer
$ 105.00
Bernard B. Wroblewski (Civil)
Engineer
$ 90.00
Karli Maeda
Designer
$ 75.00
Senior CAD Specialist
$ 65.00
Cristina M. Raymundo
CAD Specialist
$ 55.00
Nikica Favretto
Stephen Jung
Technical Assistant
$ 45.00
Lauren Raymundo
Philip Cullinen
Secretary
$ 40.00
Clerical
$ 35.00
Melissa Urroz
Chief Inspector
$ 82.00
Carl K. Whatley
Inspector
$ 76.00
Expenses
Federal Per Diem Rate
Equipment (Truck)
$ 10.00
Cellular Phone Service
At Cost
Auto Mileage (Prevailing IRS rate) $0.36/mile
Auto Rental and Gas $50.001
Meals $30 ay
Films and Prints (24 Exposure) .00/roll
Express Mailing 13.00/package
Plotfile
24X36 sheet $7.00/sheet
11 X 17 sheet $3.50/sheet
jJ
, &I sheet $1.25/sheet
17 sheet $0.45/sheet
Vellum sheet (24X36) $7.00/sheet
A — 4