Loading...
Resolution No. 8550r 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 8550 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT NO. TWO TO AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES BY AND BETWEEN THE CITY OF VERNON AND POWER ENGINEERS, INCORPORATED FOR THE MALBURG GENERATION STATION PROJECT WHEREAS, the City of Vernon is in the process of developing the Malburg Generating Station Combined Cycle Power Plant (the "Malburg Project") for the purpose of installing additional generating capacity; and WHEREAS, on January 8, 2003, the City Council of the City of Vernon approved the execution of an Agreement for Professional Consulting Services (the "Agreement") with Power Engineers, Incorporated ("Power"); and WHEREAS, the City has determined that the existing billing arrangement with Power under the Agreement needs to be modified to a time and materials basis; and WHEREAS, the City believes that the modification to the billing arrangement will assist in managing costs associated with the Malburg Project; and WHEREAS, in accordance with Sections 6 and 12.J of the Agreement, the City of Vernon and Power desire to amend the Agreement to incorporate changes to the consulting costs; and WHEREAS, on October 6, 2004, the Finance Committee considered the recommendation of Bruce V. Malkenhorst, Director of Finance, dated September 30, 2004, that Amendment No. Two to the existing Agreement with Power be approved and executed. /// 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon hereby approves Amendment No. Two to the Agreement for Professional Consulting Services with Power, in substantially the same form as the copy which is attached hereto as Exhibit A and incorporated by reference. SECTION 3: The City Council of the City of Vernon hereby authorizes the Mayor and the City Clerk to execute said Amendment for, and on behalf of, the City of Vernon. SECTION 4: The City Council of the City of Vernon hereby directs the City Clerk, or his designee, to send one fully executed Amendment to: Power Engineers, Incorporated Attn. Todd Krankkala, Project Manager 3940 Glenbrook Drive Hailey, Idaho 83333-8446 SECTION 5: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 6th day of October, 2004. r LEONIS C. MALiBURG, Nrayor ATTEST: BRUCE V. MALKENHORST, City Clerk - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 8550, was duly adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Wednesday, October 6, 2004, and thereafter was duly signed by the Mayor of the City of Vernon. (SEAL) BRUCE V. MALKENHORST, City Clerk - 3 - EXHIBIT AM" 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17I 18 19 20 21 22 23 24 25 26 27 28 AMENDMENT NO. TWO TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES THIS AMENDMENT NO. TWO TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES (this `Amendment") is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this 6th day of October, 2004, in the City of Vernon, County of Los Angeles, California BY AND BETWEEN .\R RECITALS THE CITY OF VERNON (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, CA 90058 POWER ENGINEERS, INCORPORATED (hereinafter referred to as "Consultant") 1295 South Eagle Flight Boise, Idaho 94568-3139 WHEREAS, the City and Consultant are parties to an Agreement for Professional Services (the "Agreement") dated January 8, 2003, in connection with the proposed Malburg Generating Station Combined Cycle Power Plant (the "Project"); and WHEREAS, the City and Consultant are parties to an Amendment No. One to the Agreement dated on or about May 21, 2003, to expand the scope of services to include engineering services for the design and specification of the fire protection and detection system; and WHEREAS, the City and Consultant desire to amend the Agreement to modify the billing arrangement to a time and materials basis until the Project is completed; and WHEREAS, Section 6 of the Agreement allows for changes and additions to the services to be performed by Consultant, the 1 scope of the Agreement and the adjustment of compensation and 2 completion time required thereof; and 3 WHEREAS, Section 12.J of the Agreement provides for 4 amendments and modifications to the Agreement.. 5 NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET 6 FORTH HEREIN: 7 SECTION 1: Commencing October 6, 2004, Section 4.A, 8 Consulting Costs, in the Agreement is amended to reflect that the City 9 will pay Consultant on a time and materials basis until the Project is 10 completed for a not to exceed sum of One Million Two Hundred Ten 11 Thousand Six Hundred Twelve Dollars and No Cents ($1,210,612.00), in 12 accordance with the Schedule of Charges - 2004, a copy of which is 13 attached hereto as Exhibit A and incorporated by reference 14 SECTION 2: Approval by City. This Amendment shall be 15 executed by a duly authorized representative of City following 16 approval of the terms of this Amendment by City in accordance with 17 City policies and procedures. 18 SECTION 3: Remainder of Agreement. Except as specifically 19 modified herein, all terms and conditions of the Agreement are 20 unmodified and remain in full force and effect, and are hereby 21 ratified by the parties. 22 SECTION 4: Entire Agreement. The provisions of this 23 Amendment shall constitute the entire agreement of the parties hereto 24 with respect to the subject matter included in this Amendment and 25 shall supercede any other agreement, understanding or arrangement, 26 whether written or oral, between the parties with respect to the 27 subject matter of this Amendment. 28 -2- r + . 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, the parties have caused this Amendment No. Two to be executed by and through their authorized officers on the date, month and year first written above. ATTEST: BRUCE V. MALKENHORST, City Clerk APPROVED AS TO FORM: ERIC T. FRESCH, City Attorney CITY OF VERNON LEONIS C. MALBURG, Mayor POWER ENGINEERS, INCORPORATED By: Name• Title. By: Name• Title: -3- SUPPORTING DOCUMENTS 1 2 3 4 5 6 7 8 91 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AMENDMENT NO. TWO TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES THIS AMENDMENT NO. TWO TO THE AGREEMENT FOR PROFESSIONAL CONSULTING SERVICES (this "Amendment") is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this 6th day of October, 2004, in the City of Vernon, County of Los Angeles, California BY AND BETWEEN :ZED THE CITY OF VERNON (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, CA•90058 POWER ENGINEERS, INCORPORATED (hereinafter referred to as "Consultant") 1295 South Eagle Flight Boise, Idaho 94568-3139 WHEREAS, the City and Consultant are parties to an Agreement for Professional Services (the "Agreement") dated January 8, 2003, in connection with the proposed Malburg Generating Station Combined Cycle Power Plant (the "Project"); and WHEREAS, the City and Consultant are parties to an Amendment No. One to the Agreement dated on or about May 21, 2003, to expand the scope of services to include engineering services for the design and specification of the fire protection and detection system; and WHEREAS, the City and Consultant desire to amend the Agreement to modify the billing arrangement to a time and materials basis until the Project is completed; and WHEREAS, Section 6 of the Agreement allows for changes and additions to the services to be performed by Consultant, the I scope of the Agreement and the adjustment of compensation and 2 completion time required thereof; and 3 WHEREAS, Section 12.J of the Agreement provides for 4 amendments and modifications to the Agreement. 5 NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS SET 6 FORTH HEREIN: 7 SECTION 1: Commencing October 6, 2004, Section 4.A, 8 Consulting Costs, in the Agreement is amended to reflect that the City g will pay Consultant on a time and materials basis until the Project is 10 completed for a not to exceed sum of One Million Two Hundred Ten 11 Thousand Six Hundred Twelve Dollars and No Cents ($1,210,612.00), in 12 accordance with the Schedule of Charges - 2004, a copy of which is 13 attached hereto as Exhibit A and incorporated by reference 14 SECTION 2: Approval by City. This Amendment shall be 15 executed by a duly authorized representative of City following 16 approval of the terms of this Amendment by City in accordance with 17 City policies and procedures. 18 SECTION 3: Remainder of Agreement. Except as specifically 19 modified herein, all terms and conditions of the Agreement are 20 unmodified and remain in full force and effect, and are hereby 21 ratified by the parties. 22 SECTION 4: Entire Agreement. The provisions of this 23 Amendment shall constitute the entire agreement of the parties hereto 24 with respect to the subject matter included in this Amendment and 25 shall supercede any other agreement, understanding or arrangement, 26 whether written or oral, between the parties with respect to the 27 subject matter of this Amendment. 28 -2- 1 2 3 4 5 6 7' 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, the parties have caused this Amendment No. Two to be executed by and through their authorized officers on the date, month and year first written above. CITY OF VERNON By: LEONIS C. MALB RG, Ma or ATTEST: firr__ BRUCE V. MALKENHORST, City Clerk APPROVED AS TO FORM: —5-r— 7�� ERI T. RE C , -C'1'-ty Attorney POWER NG N ERS, INCORPORATED By: Name • JO H/V (!'qV'91Vf✓9't Tj N2 -3- Page 2 POWER ENGINEERS INC. SCHEDULE OF CHARGES —2004 This standard scnedae of Charges is for professional services, be or of the work and will be due and payable when 1-sued. All accounts not paid w" chicly (30) days r Owners rece4x of the Invoke vA bear a SERVICE CHARGE OF 1.0% PER MONTH for each month the Invoice is unpaid. SPECIAL APPLICATION SOFTWARE REPRODUCTION Level I Software$10.001hr. Level II Software " $20.00/hr. Drawin 9 s Level lit Software ••• $35 Electrostatic (C Size) $1.30/ea. Level IV So ftware'••• .00/ftr. $i10.00/hr. Electrostatic (D Size) Electrostatic (E Size) $3.0%a. $5.50%a. ' Level 1 Software includes, among others, CPM, Traverse PC, Mylar (C Sae) $10.IXUea. . Structural Design, Foundation Design, HVAC Design, and Mylar (D Size) $14,00/� Conveyor Design. de um $14.00lea. (C Size) Level II Software Includes, among others, SIMFLEXS, DPAG, Dapper, Captor, PTW, Harrnflo, Cafes PLS Vellum Size) Velum Velum (E Size $6 IWea. CADD. TL-CADD. AutoCAD, MicroStatlon, Drafting Station Scanning See Igor rate w/software, and specialized estimating programs. Documents "'Level III Software includes, among others, PDS, Rebis, GIS Single -sided Copies 11 x 17 $0.15/ea. 8 x 11 $0.05/ea. Workstation, and Engineering Workstation. Double -sided Copies 11 x 17 $0.301ea. 8 x 11 $0.10/ea. Single -Sided Color Copies 11 x 17 $3.00/ea. 8 x 11 $1.50/ea. ""Level IV Software includes, among others, T-2000, CDEGS, Spiral Comb $2.651ea. PTI, and Animation. 3 Ring Binder Dependent on size Transparencies $1.00%a SURVEY EQUIPMENT Special Copy Center Projects (Labor) $30.00/hr. Survey Equip. to support field crew $70.00fday GPS Equipment 2 Units $60.00/hour $350.001day ° . GPS Equipment 3 Units $80.00fixwr $450.00/day PHOTOGRAPHIC RECORDING Portable Video Camara $35.00/day Video Tapes $10.0WO& Otter expenses such as subcontractors, rental equipment, photography. transportation, rental vehicles, shipping. outside computer services. lodging. meals, other reproduction, express mail, courier/delivery service, special supplies, are charged at cost plus a carrying and handling charge of 10%. Communication Charge - including but not limited to long distance telephone and fax, charged at 1 % of labor billing charges. 2004 Fees(03/24/04) Page 1 POWER ENGINEERS INC. SCHEDULE OF CHARGES — 2004 Tills standard schedule of Charoes to eferr voices win be suhmki ad —* y and/or upon oo Mbll n OMWIMM be duo and M e r is —Ot of the hhvoke w11 beer a SERVICE CHARGE OF 1.0% PER MONTH for each month the Invoice Is unpaid. PERSONNEL CLASSIFICATION President................................................................... $165.00/Itr. .......................................................................... Corporate Principal SeniorProject Manager III ............................ ................................................................................................................. $165.00/hr. Senior Project Manager II ........................................ $149.00/hr. ................................................................................................. Construction Manager 111 Senior Project Manager I ............... Project Manager III Construction Manager 11 Senior Project Engineer II Engineer V Project Manager II.......... Construction Manager I Senior Project Engineer I R-O-W Agent IV Project Engineer ill Engineer IV Designer V ....................................................................................... $129.00/hr. ............. $108.00/hr. ProjectManager i........................................................................ ........................ $103.00/hr. Project Engineer II Engineer III Designer IV Environmental Specialist III R-O-W Agent III EngineerII................................................................. Project Engineer I Designer III Technician IV Environmental Specialist II Procurement Specialist 11 Scheduling Specialist II R-O-W Agent II Programmer III Engineeri.................................................................................. Designer It Technician ill Environmental Specialist 1 Procurement Specialist i Field Representative IV Scheduling Specialist I Programmer 11 ..................................................... $93.00/hr. $82.00/hr. DesignerI ................................................... ................................ ....................... $72.00/t1r. Drafter III Technician 11 Administrative Assistant I Field Representative III Staff Assistant 11 Programmer I Drafter11................................................................................................. $59.00/lu. Staff Assistant Field Representative 11 Drafter1............................................................................................................................. ........................... $47.00/hr. General Office Assistant Field Representative I utility No P—lw t is charged for overtime work. Personnet with speciatized experWne are employed by or on retekw to POWER. Charges for these specialists are negogeted an an k1*,4du21 basis depending on the assigromL Prolessional Um for depositions and testimony is charged at 1.5 times the rate for services: fuk-day minimums apply. 2004 Fees (03/24/04) oy ..a95- PROJECT: Engineering — 66kV Comprehensive Protection Maintenance Sweep and Comprehensive Coordination Study for Performance & Reliability of the System PO 13117 TO: Power Engineers, Inc. 3940 Glenbrook Drive (Consultant and/or Vendor) P.O. Box 1066, Halley, ID 83333 REQUESTED BY: City of Vernon You are hereby directed to make the herein described changes, or do the following described work not included in the original agreement. ADDITIONAL SCOPE OF WORK AND ADJUSTMENTS IN COMPENSATION AS IDENTIFIED BELOW FOR THE REMAINDER OF THIS CALENDAR YEAR: Continue to assist with tasks associated with the "Protective Relay Study" and the "Protection Sweep Field Testing," which will include: • Identifying and correcting schematic and wiring changes • System drawing updates (modifications, proof checking and final reproduction) • Drafting, as necessary Total amount of this requested Change Order not to exceed: $94,000.00 Except as specifically modified herein, all terms and conditions of the original Agreement are unmodified and remain in full force and effect, and apply to the extended time of performance, the additional work and additional costs as if those terms, services and costs were originally included in the Agreement Base Amount of Contract..............................................$225,950.00 Approved Contract Amount ........................................ ........................ $225,950.00 Revised contract Am i I 'ng this requ sted Change Order No.1).... ........................ 319 950.00 Approve Date: 2006 AL O'CALLAGH3KDhyAQa Light & Power We, the undersigned Consultant(Vendor, have given careful consideration to the change proposed and hereby agree. If this proposal is approved we will provide all equipment, furnish all materials (except as may be noted otherwise), and perform all services necessary for the work specified above, and will accept as full payment therefore the prices shown ,/albove. Accepted: Power En ineers I . (ConsultanYVendor) Date: IV `' V 157 2006 By: '�./ �,.. Title: ira car / l rJ �GfZ cc: Purchasing DATE: November 30, 2006 TO: Bruce V. Malkenhorst, Jr., Assistant City Attorney/Acting City Clerk FROM: Gloria J. Orosco RE: Power Engineers The Finance Committee at their meeting held November 21, 2006 recommended approval of Change Order No.1 to the Power Engineers, Inc., agreement (PO13117). This was subsequently approved by City Council at their November 22, 2006 meeting. Attached hereto is a fully executed duplicate original Change Order No.1 for your records. A fully executed duplicate original has been submitted to Power Engineers, Inc. for their records. If you have any questions with regard to this matter please do not hesitate to contact me. Thank you. /gjo c: D. O'Callaghan (via e-mail) Light & Power Document Control L & P AP Contract File DATE: November 8, 2006 O;S�� " TO: Bruce V. M8Ikenhorst, Jr., Assistant City Attorney/Acting City Clerk FROM: Donal O'Callaghan, Director of Light &Power ICJ M r"0 p)�0 RE: PEI — PO 13117 — Request for Change Order No. 1 ffc i I I21 0 CO 11 On March 23, 2006, a purchase order was issued to Power Engineers, Inc. in the amount of $225,950.00 pursuant to City Council approval on January 18, 2006. PEI was contracted with for the purpose of providing us a detailed power system analysis of the city's 66kV system. At this point in time PEI has identified (and corrected) a number of schematic and wiring changes as necessary. In addition to this they are revising/correcting system drawings, proof checking and reproducing final documentation, as well as drafting any additional drawings. Attached hereto for your review is proposed Change Order No. 1 It is hereby recommended that the attached proposed Change Order No. 1 to the original Services Agreement with Power Engineers, Inc., be approved in an amount not to exceed $94,000.00. If approval is granted, this will amend the contract total to a not to exceed amount of $319,950.00. /gjo i�a �.e,-� �11 c: A. Nour .� � `�. L & P Document Control���j, Q-�« L & P A/P Contract File C 1-4