Loading...
Resolution No. 8565T 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 8565 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON AUTHORIZING THE ISSUANCE OF REQUEST FOR ANNUAL PUMP CONTRACT -FISCAL YEAR 2004-2005 FOR THE REMOVAL, REPAIR, AND REINSTALLATION OF THE CITY'S WELL AND BOOSTER MOTOR PUMPS WHEREAS, the City of Vernon operates its own water production and distribution system; and WHEREAS, the City of Vernon is interested in obtaining proposals from qualified vendors to remove, repair and reinstall City's well and booster motor pumps and provide annual well and pump maintenance and emergency repair services on the City's system; and WHEREAS, on October 20, 2004, the Finance Committee considered the recommendation of Bruce V. Malkenhorst, Director of Finance, dated October 14, 2004, that the City issue Request for Proposal for Annual Pump Contract -Fiscal year 2004-2005 ("RFP") pursuant to Section 2.29-2 of the Vernon City Code. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon hereby directs the City Administrator/City Clerk, or his designee, to issue the RFP, a copy of which is attached hereto as Exhibit A and incorporated by reference, to one or more qualified vendors, and to report to the City,Council on the proposals received with a recommendation for action. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 3: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 20th day of October, 2004. EONIS C. MALB.RG, May r ATTEST: BRUCE V. MALKENHORST, City Clerk - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 8565, was duly adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Wednesday, October_20, 2004, and thereafter was duly signed by the Mayor of the City of Vernon. (SEAL) BRUCE V. MALKENHORST, City Clerk - 3 - EXHIBIT n CITY COUNCIL 4.EONIS C. MALBURG Mayor THOMAS A. YBARRA Mayor Pro-Tem WM. 'BILL" DAVIS Councilman H.-LARRY- GONZALES Councilman W. MICHAEL McCORMICK Councilman BRUCE V. MALKENHORST City Administrator/City Clerk Chief Executive Officer of Light & Power FAX: (323) 826-1438 CITY HALL 4305 SANTA FE AVENUE, VERNON, CALIFORNIA 90058 TELEPHONE (323) 583-8811 OCTOBER 2004 Request for Proposal ERIC T. FRESCH City Attorney FAX: (323) 82&1439 KEVIN WILSON Director of Community Services & Water FAX: (323) 826-1435 STEVEN E. PARKER Fire Chief FAX: (323) 826-1407 SOL BENUDIZ Police Chief FAX: (323) 826-1481 LEWIS J. POZZEBON Director of Environmental Health FAX: (323) 588-4320. Annual Pump Contract — Fiscal Year 2004 - 2005 The City of Vernon is requesting quotations for the removal, repair, and reinstallation of the City's well and booster motor pumps. The City has provided each vendor with an itemized list of various tasks needed to facilitate these repairs. Upon review, vendors are asked to provide firm cost estimates for these items outlined on the following page. The City will be awarding an annual contract to the vendor who best meets the requirements of the City Water Department. Insurance — Before the contract is awarded, the City of Vernon requires the contractor to provide proof of insurance, including a standard certificate of insurance, in at least the amounts and coverage indicated on Exhibit A attached hereto. In addition to the standard certificate of insurance, proof of general and umbrella liability coverage shall also be furnished in the form indicated on Exhibit A attached hereto. Bid Submittal — All bids are to be received in two separate sealed envelopes. Envelope one should be clearly marked: Bids for Cost Comparisons. Envelope two should be clearly marked: Contractor Qualifications. The contract will be awarded based on a combination of cost and qualification factors. The submittal of any incomplete forms will automatically disqualify the bidder from the bid process. Bid Deadline — All bids must be delivered to the City of Vernon Water Department by 2:00 P.M. on Tuesday, November 16, 2004. Contact Person — The contact person for this repair is Scott Rigg who can be reached at (323) 583-8811 Monday through Thursday between 7:00 A.M. and 5:30 P.M. BID ITEMS: ITEM 1: Mobilization — Mobilize and demobilize pump rig for the installation or removal of well pumping equipment Each: ITEM 2: Removal - Remove Pumping equipment for oil lubricated vertical turbine well including motor, discharge head, column pipe, line shaft assembly, pump assembly, suction pipe, shaft assembly, suction pipe and strainer. Pump depths - may vary between 300-feet and 475-feet. Total Cost: ITEM 3: Removal - Remove vertical turbine booster, pump equipment including. motor, discharge head, column pipe, shaft assembly and pump assembly. Pump depths may be at approximately 5-feet to 40-feet. Total Cost: ITEM 4: Service Crane — Furnish service crane for the installation and removal of booster pump equipment. Total Cost: ITEM 5: Horizontal Booster Pump — Disassemble horizontal booster pump and inspect for wear and damage. City crews will remove and deliver pump to contractor's repair facilities and pickup upon completion of repairs. 6" Horizontal Booster Pump 8" Horizontal Booster Pump Cost Per Unit: Cost Per Unit: ITEM 6: Horizontal Booster Pump, Split Case — Disassemble booster pump, split case, and inspect for wear and damage. City crews will remove and deliver pump to contractor's repair facilities and pickup upon completion of repairs. 6" Horizontal Booster Pump, Split Case: Cost Per Unit: 8" Horizontal Booster Pump, Split Case: Cost Per Unit: ITEM 7: Removal — Remove pumping equipment for submersible well including discharge head, column pipe, pump assembly, electrical cable and motor. Pump depths may vary between 300-feet and 475-feet. Cost Per Foot: ITEM 8: Cable Replacement — Furnish new electrical cable and necessary fittings for submersible well with 200 H.P. motor. Pump depths range from 370- feet to 400- feet. Complete in place. Cost Per Foot: ITEM 9: _ Column Pipe — Furnish and install new steel column pipe. 10-inch x 20-foot Lengths: Cost Per Unit: 12-inch x 20-foot Lengths: Cost Per Unit: ITEM 10: Installation — Install pumping equipment for oil lubricated vertical turbine well including motor, discharge head, column pipe, line shaft assembly, pump assembly, suction pipe and strainer. In addition, stretch shaft, check rotation and test pump operation. City crews will assist in wiring and energizing motor. Complete in place. Total Cost: ITEM 11: Installation - Install vertical turbine booster pump equipment including motor, discharge head, column pipe, shaft assembly and pump assembly. Pump depth may be at approximately 5-feet to 40-feet. In addition, stretch shaft, check rotation and test pump operation. City crews will assist in wiring and energizing motor. Complete in place. Total Cost: ITEM 12: Installation — Install pumping equipment for submersible well including discharge head, column pipe, pump assembly, electrical cable and motor. Total Cost: ITEM 13: Line Shaft Assembly — Replacement parts cost for oil lubricated line shaft assembly. Complete in place. Line Shaft Bearings: Line Shaft Enclosing Tube: Stainless Steel Line Shaft: 1045 Carbon Steel Line Shaft: Cost Per Unit: Cost Per Unit: Cost Per Unit: Cost Per Unit: ITEM 14: Line Shaft Assembly Replacement — Furnish and assemble new oil lubricated line shaft assembly including 1045 carbon steel line shaft, line shaft enclosing tube, line shaft bearings and tube stabilizers. During assembly, file off all wrench marks and wrap ends. Pump depths may vary between 300-feet and 475-feet. Complete in place. Cost Per Foot: ITEM 15: Pump Assembly — Disassemble and clean pump assembly for damage assessment and inspection by a City inspector. Each section of line shaft, line shaft tube and line shaft bearings shall be disassembled and inspected for wear and damage. Cost Per Foot: ITEM 16: Pump Assembly — Reassemble existing line shaft, line shaft tubing and line shaft bearings. Machine the face of all tubes flat and true, balance and straighten all line shafts, file off wrench marks, and wrap ends. Cost Per Foot: ITEM 17: Suction Pipe Replacement — Furnish and install new 10-inch x 10-foot long suction pipe. Cost Per Unit: ITEM 18: Galvanized Cone Strainer — Furnish and install new galvanized cone strainer Total Cost: ITEM 19: Top Tube Assembly — Furnish and install new top shaft and top shaft enclosing and recondition existing tube stretch assembly. Complete in place. Cost Per Unit: ITEM 20: Transport — Transport well pumping equipment including discharge head, column pipe, shaft/tube assembly, pump assembly, suction pipe and strainer from well site to contractors shop' and from shop back to well site. Pump lengths may vary between 300-feet and 475-feet. Total Cost: ITEM 21: Transport — Transport booster pump equipment including discharge head, column pipe, and pump assembly from booster plant to contractor shop and from shop back to booster plant. Pump lengths are approximately 5- feet to 40-feet. Total Cost: ITEM 22: Video Inspection — Perform video inspection of entire well casing and furnish complete inspection report and video. Well depths range from 1,300-feet to 1,600- feet. Total Cost: ITEM 23: Bailing and Removal — Bail approximately 100-feet of sediment from well bottom. All materials bailed from well shall be removed from well site and properly disposed of. Contractor will be required to follow N.PD.E.S. standards. Per Gallon Cost: ITEM 24: Wirebrush — Wirebrush all perforated zones of well casing. Perforated zones typically range from 510-feet to 1,600-feet. Cost Per Foot: ITEM 25: Airliffing — Remove sediment and debris by means of airlifting. Each: ITEM 26: Install Test Pump: Furnish, install and remove test pump equipment capable of producing 3,000 GPM at 500-feet TDH to redevelop well to maximum production, and include a deep suction pipe to maximize the redevelopment process. Total Cost: ITEM 27: Redevelop — Redevelop well with test pump. Cost Per Hour: ITEM 28: Discharge Piping — Furnish, install and remove temporary discharge piping for well redevelopment and/or flushing. Cost Per Foot: ITEM 29: Sonar Jet — Sonar Jet all perforated zones of well casing. Perforated zones typically"range from 510-feet to 1,600-feet. Cost Per Foot: ITEM 30: Casing Repair — Swedge liner into well casing to repair miscellaneous holes or - damaged areas. A typical liner will be approximately 5-feet to 10- feet long. Complete in place. 12" Liner: Per Unit Cost: 14" Liner: Per Unit Cost: 16" Liner: Per Unit Cost: 18" Liner: Per Unit Cost: ITEM 31: Sounding Tube — Furnish and install 1" PVC schedule 80 sounding tube with . flush joint connections. Sounding tube shall be strapped to column pipe using inch stainless stainless steel bandit & buckle during pump installation and come up through the base of the discharge head. Complete in place. Cost Per Foot: ITEM 32: Air -Line — Furnish and install 1/4" Stainless Steel air -line (1-piece type) with stainless steel fitting, calibrated level indicator gauge and mounting bracket. Air- line shall be strapped to column pipe using 3/4-inch stainless steel bandit & buckle during pump installation and come up through the base of the discharge head. Complete in place. Cost Per Foot: ITEM 33: Lubricating Oil Removal— Remove and dispose of all lubricating oil from well. All material removed from well shall be removed from well site and properly disposed of. Contractor will be required to follow N.P.D.E.S. standards. Total Cost: ITEM 34: Repair Recommendations— Prepare a detailed report outlining repair recommendations and materials needed to restore the well to meet intended operating requirements Each: ITEM 35: Disinfection — Inject chlorine solution into well casing and hold residual in all parts of well above 250 ppm for a minimum of 48 hours. Chlorine shall be neutralized before discharging to drain. Contractor will be required to prepare and follow a N.P.D.E.S. workplan in accordance with appropriate standards. Total Cost: The estimated quantities are for cost comparisons only. The City will only be responsible for the actual materials installed and labor time spent based on the per unit prices. WELL AND BOOSTER PUMP SPECIFICATIONS Well 11: Make: Layne & Bowler Serial Number: V75 — 70614 Bowls: Rg Column: 12" Standard Butt Tubing: 3 1/2" Shafting: 2 7/16" Suction: _ 12" — 20' Overall Length: 471' Airline: 425' Pump Bowls: 440' Well Depth: 1,343' Well 12: Make: A.O. Smith Serial Number: 7351795 Bowls: D.K.L. —15 — T, 8 Stage, 14" Length Column: 8" Standard Butt Tubing: 3 %2" Shafting: 2 V4" Suction: 12" - 20' Overall Length: 420' Airline: 420' Bowl Depth: 470' Well Depth: 1,588' Well 14: Make: Layne & Bowler Serial Number: 29640 Bowls: 13 Cm, 8 Stage, Length 10'9-%2" Column: 12" Standard Butt Tubing: 3" Shafting: 1-15116" Suction: 12" — 20' Strainer: 3' — 2-1/2" Overall Length: 390' Airline: 362' Bowl Depth:. 420' Well Depth: 1,302' 8 Well 15: Make: Johnson Vertical Turbine Serial Number: JZ3981. Type: 14 BC Bowls: Cast Iron U.T. Impellers, 5 stage Length Column: 12" — 20' Standard Butt Joints Tubing: 2-1/2" x 6'8" In 20' Lengths Shafting: 1-11/16" Suction: 10" x 20' Strainer: 30" Overall Length: 357' Airline: 345' Bowl Depth: 400' Well Depth: 1,550' Well 16: Make: Byron Jackson, Submersible Serial Number: 701— LO — 292 Bowl Assembly: 14 CGL, 4 Stage RPM: 1,770 Volts: 460 (Cable Size: 300 MCM, 600 Volts 350') AMPS: 240 Airline: 369' Bowl Depth: NA Well Depth: 1,520' Well 17: Make: Layne & Bowler Serial Number: 23547 Bowls: 14 R4, 10 Stages Column: 347', 34 x 10'— 12" Tubing: 3-1/2" Shaft: 2-3/16" Suction: 12" — 20' Standard Butt Bowl Depth: 440' Well Depth: 1,550' 9 Well 18: Make: Serial Number: Casing Size: Bowl Depth: Column: Airline: Cable: Bowl Depth: Well Depth: Well 19: Make: Serial Number: Tube: Shaft: Suction: Bowl Depth: Well Depth: Bowl Depth: Well Depth: Well 20: Make: Tube: Shaft: Depth: Bowl: Byron Jackson, Submersible 346119 16" 400', 96 — WR - 0028 10"-20' 410', V4" 300 MCM, with Sub -Cable, 405' 400' 1,443' Layne & Bowler 16511 3-1/2" 2-3/16" 12'2 NA 1,660' 300' 1,620' Layne & Bowler 3-1/2" 2-3/16" 1,620' 14 RM, 12 Stage Booster Plant I - Booster Puma I: Make: Layne & Bowler, Verti-line Serial Number: D-16288 RPM: 1,770 GPM: 800 Model: 10 R Booster Plant I - Booster Puma 2: Make: Layne & Bowler, Verti-line Serial Number: D-16289 RPM: 1,770 GPM: 1,350. Model: 12 R 10 Booster Plant I — Booster Pump 3 Make: Layne & Bowler, Verti-line Serial Number: D16290 RPM: 1,770 GPM: 2,100 Model: 16 EH Booster Plant I Booster Puma 4: Make: Layne & Bowler Serial Number: D16291A RPM: 1,775 GPM: 3,150 Model: 16 KH Booster Plant I — Booster Puma 5 Make: Layne & Bowler, Verti-line Serial Number: D1629B RPM: 1,775 GPM: 3,150 Model: 16 KH Booster Plant 2 — Booster Puma 1: Make: A.O. Smith Serial Number: 7351793 Type: Vertical Turbine; 12" DKH 3 Stage Application: 1,100 GPM @ 601bs Booster Plant 2 — Booster Pump 2• Make: A.O. Smith Serial Number: 7351793 Type: Verti-line Turbine, 12" DKH, 3 Stage Application: 1,100 GPM @ 60 lbs Booster Plant 2 - Booster Pump 3: Make: A.O. Smith Serial Number: 7351794 Type: Vertical Turbine, 14" DKH, 4 Stage Application: 2,900 GPM @ 70 lbs 11 Booster Plant 2 — Booster Pump Make: Fairbanks Morse Serial Number: 339812 Type: 8" 5814E, Stage — Double Suction Centrifugal Application: 1,500 GPM @ 60 lbs Booster Plant 2 — Booster Pump 5 Make: Fairbanks Morse Serial Number: 500949 Type: _ 6" 5814E, Stage — Double Suction Centrifugal Application: 23000 GPM @ 60 lbs Booster Plant 2 — Booster Pump 6• Make: Fairbanks Morse Serial Number: 500941 —503251 Type: 8" 5814E, Double Suction Centrifugal Application: 2,800 GPM @ 100 lbs Booster Plant 3 — Booster Pump 1 Make: A.O. Smith Serial Number: 7351793 Type: Vertical Turbine, 12" DKH, 3 Stage Application: 1,100 GPM @ 60 lbs Booster Plant 3 — Booster Pump 2• Make: A.O. Smith Serial Number: 7351793 Type: Vertical Turbine, 12" DKH, 3 Stage Application: 1,100 GPM @ 60 lbs Booster Plant 3 — Booster Pump Make: Smithway Serial Number: 7351794 Type: Vertical Turbine, 14 DKH, 4 Stage Application: 2,900 GPM @ 70 lbs Booster Plant 3 — Booster Pump 4• Make: U.S. Pump Serial Number: 339812 Type: Verti Booster, 3 Stage Application: 1,800 GPM 12 Booster Plant 3 — Booster Pump Make: U.S. Pump Serial Number: NA Type: Verti Booster, 3 Stage Washington Underpass - Pump 1 Serial Number: K209915 Washington Underpass — Pump 2• Serial Number: K209915 Downey Underpass — Pump 1 Make: Fairbanks Morse Model: 6715 Downey UndeMass — j= 2• Make: Fairbanks Morse Model: 6715 13 EXHIBIT INSURANCE SCHEDULE (CONTRACTOR) Contractor shall provide proof of insurance, including a standard certificate of insurance, in at least the following amounts and coverage (combined single limit permitted): I. Coverage and Limits Bodily jury PropertDamage Hazards Each Person Each Accident Each Accident Automobile Liability Owned Automobiles $ 500,000 $1,000,000 $ 500,000 Hired Automobiles $ 500,000 $1,000,000 $ 500,000 Non -Owned Automobiles $ 500,000 $1,000,000 $ 500,000 Workers' Compensation $ Statutory Employers' Liability $1,000,000 per em llooyer II. Liabili General Liability $1,000,000 $2,000,000 $1,000,000 Premises Operations $1,000,000 $2,000,000 $1,000,000 Elevators (If Applicable) $1,000,000 $2,000,000 $1,000,000 Independent Contractors $1,000,000 $2,000,000 $1,000,000 Products - Completed Operations $1,000,000 $2,000,000 $1,000,000 Contractual Liabilitv $1,000,000 $2,000,000 $1,000,000 Umbrella Liability $2,000,000 $2 000 000 $2,000,000 a. The general liability policy shall contain the following special endorsements which shall be noted on or attached to the standard certificate of insurance: I. An endorsement naming the City of Vernon, its officers, and employees as additional insureds under the policy. 2. An endorsement providing the City of Vernon thirty (30) days notice of cancellation or material reduction of coverage. 3. An endorsement providing coverage for all operations under this Agreement. 4. Such other endorsement as may be required by City. b. In addition to the above, the Consultant shall provide such further proof of insurance documentation as the City deems necessary.