Loading...
Resolution No. 8695 18 19 20 21 22 23 24 25 26 27 28 1 2 3 4 RESOLUTION NO. 8695 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND RATIFYING THE EXECUTION OF AN INDEMNITY AGREEMENT BY AND BETWEEN THE CITY OF VERNON AND SOUTHERN CALIFORNIA GAS COMPANY 5 6 7 WHEREAS, the City of Vernon ("City") is constructing a 134 MW Combined Cycle Power Plant, the Malburg Generating Station for the purpose of installing additional generating capacity that will yield 8 9 10 an efficient, cost-effective, and reliable source of electric 11 12 generation to the City's inhabitants; and WHEREAS, the City has constructed a natural gas distribution system served at two locations (Bandini/Downey and Fruitland/Downey) from SoCalGas Transmission Line 756 and two regulator stations are 13 14 15 16 located at the two locations to distribute gas from the transmission system into the distribution system located in the City (the "Vernon Gas System"); and 17 WHEREAS, in anticipation of the upcoming start-up of the Malburg Generating Station, the City has requested that the Southern California Gas Company ("SoCalGas") provide wholesale natural gas service to Vernon's Gas System pursuant to Tariff Schedule GW-VRN; and WHEREAS, SoCalGas is requiring that the City enter into an Indemnity Agreement setting forth the terms and conditions under which it can provide the natural gas service to the City; and WHEREAS, in order to meet the urgent need to obtain the natural gas service to Vernon's Gas System, the City Administrator executed an Indemnity Agreement (the "Agreement") with SoCalGas dated February 16, 2005, as revised, subject to ratification by the City 1 Council; and 2 WHEREAS, on March 16, 2005, the Finance Committee considered 3 the recommendation of Bruce V. Malkenhorst, the Director of Finance, 4 dated March 10, 2005, that the actions of the City Administrator in 5 executing the Agreement, as revised, with SoCalGas be ratified; and 6 WHEREAS, the City Council desires to approve and ratify the 7 Agreement and the revised Exhibit 1 to the Agreement, as executed by 8 the City Administrator; and 9 WHEREAS, the City Council of the City of Vernon has 10 determined that, pursuant to the provisions of subsection (a) of 11 Section 2.27 of the Vernon City Code, it is in the public interest and 12 necessity to ratify entering into the Agreement, as revised, with 13 SoCalGas. 14 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE 15 CITY OF VERNON AS FOLLOWS: 16 SECTION 1: The City Council of the City of Vernon hereby 17 finds and determines that the recitals contained hereinabove are true 18 and correct. 19 SECTION 2: The City Council of the City of Vernon hereby 20 ratifies the execution of the Indemnity Agreement with SoCalGas dated 21 February 16, 2005, as revised, a copy of which is attached hereto as 22 Exhibit A and incorporated by reference. 23 / / / 24 / / / 25 / / / 26 / / / 27 / / / 28 / / / - 2 - 1 SECTION 3: The City Clerk of the City of Vernon shall 2 certify to the passage of this resolution, and thereupon and 3 thereafter the same shall be in full force and effect. 4 APPROVED AND ADOPTED this 16th day of March, 2005. 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 5 6 7 ATTEST: ~..... d ' ' /~~ ., BRUCE V. MALKENHORST, City Clerk 8 '9 10 - 3 - ''). 1 STATE OF CALIFORNIA ) 2 ) ss COUNTY OF LOS ANGELES ) 3 4 I, BRUCE V. MALKENHORST, City Clerk of the City of Vernon, do 5 hereby certify that the foregoing Resolution, being Resolution No. 8695, 6 9.W4, was duly adopted by the City Council of the City of Vernon at a 7 regular meeting of the City Council duly held on Wednesday, March 16, 8 2005, and thereafter was duly signed by the Mayor of the City of 9 Vernon. 10 12 BRUCE V. MALKENHORST, City Clerk 13 (SEAL) 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 4 EXHIBIT A F; , Indemnity Agreement Between City of Vernon and Southern California Gas Company February 16,2005 This agreement ("Agreement") is entered into and effective as of February 16, 2005 ("Effective Date"), by and between Vemon, a California municipal corporation ("Vemon" or "City") and Southern California Gas Company, a California corporation ("SoCalGas" or "Company"), collectively, the "Parties" or, individually, the "Party". 1.0 General 1.1 The City of Vernon has requested the.Southem California Gas Company to provide wholesale gas service pursuant to SoCalGas' published tariff Schedule GW-VRN, Wholesale Natural Gas Service to Vernon's newly constructed natural gas distribution system, described in detail in Exhibit I attached hereto, ("Vernon's Gas System") 1.2 In furtherance of such request, Vernon has provided SoCalGas with certain data, including but not limited to testing records (pressure tests, welding, CP, etc.), installation procedures, mapping documents, and material specifications, etc. upon which SoCalGas mayor will rely to satisfy itself under appropriate DOT and SoCalGas' rules, regulations, and procedures, published or unpublished that it can turn the gas on to Vernon's Gas System. As a normal course of business, SoCalGas reviews available information to determine if it can operate a new interconnection with an end-user in accordance with applicable safety requirements and ordinances prior to initiation of service. Vernon warrants without exception that these materials Vernon has provided to SoCalGas are true, complete and accurate and that SoCalGas can rely on such truth, completeness and accuracy. in deciding to begin and continue the provision of the above referenced gas service to Vernon. 2.0 Safety Vernon further warrants that its gas system is safe and meets appropriate DOT rules, regulations, and procedures. Vernon warrants it will provide information to SoCalGas for any purpose as reasonably required in accordance with good utility practice. 3.0 Tax Responsibility In furtherance of our understanding and agreement, neither Vemon nor its employees nor its agents shall be deemed employees of SoCalGas or its affiliates for any purpose whatsoever by virtue of any services provided by SoCalGas. Vernon is responsible for the construction, operation and maintenance of its gas system and neither Vernon nor its employees, contractors' agents or representatives shall be on the payroll or deemed to be on, the payroll of SoCalGas or entitled to any benefits extended to SoCalGas' employees or employees of its affiliates. Vernon shall be solely liable for withholding and remitting payment of all taxes relating to the operation of its gas system including, but not limited to state and federal income taxes, Social Security tax, self. employment tax, unemployment insurance premiums, and disability insurance contributions. 4.0 Indemnification 4.1 As between SoCalGas and Vemon, Vemon shall be solely responsible for and shall indemnify, defend and hold SoCalGas, its current.and future parent and affiliates and their respective directors, officers, shareholders, employees, agents, representatives, successors and assigns, harmless from and against any and all claims, actions, suits, proceedings, losses, liabilities, penalties, fines, damages, costs or expenses including without limitation, attorneys' fees (including costs, fees and disbursements of in... house and outside counsel) of any kind whatsoever resulting from: (a) injuries to or death of any and all individuals, including, without limitation, members of the general public, or any employee, agent, independent contractor or consultant or affiliate of either Party, arising out of or connected in any manner with the construction, operation and maintenance of Vernon's gas system and/or SoCalGas' services thereto; (b) damage to, loss of, and/or destruction of property, including, without limitation, to, property of SoCalGas, Vernon or others arising out of or connected in any manner with the construction, operation and maintenance of Vernon's Gas System and/or SoCalGas' services thereto; (c) any unauthorized release of a hazardous material by Vernon or its agents or any party acting on behalf or under the direction of Vernon; (d) any enforcement or compliance proceeding commenced by or in the name of any governmental agency because of an alleged, threatened or actual violation of any safety or environmental law , rule or regulation by Vernon; (e) any action reasonably necess~y to abate, remediate or prevent a violation or threatened violation of any safety or environmental law rule or regulation by Vernon or its agents or any party acting on behalf or under the direction of Vernon ; (f) claims, suits, damages, loss, liability, or actions for indemnity by the County of Los Angeles or any city adjacent to Vernon which is affected by the construction, operation and maintenance of Vernon's Gas System; (g) claims, suits, damages, loss, liability, or actions for indemnity by governmental agencies issuing permits in connection with the the construction, operation and maintenance of Vernon's Gas System arising out of actions or inactions of Vernon; (h) claims, suits, damages, loss, liability, or actions for indemnity by the owner or tenants of the property in the vicinity of, adjacent to, or on which any part of the construction, operation and maintenance of Vernon's Gas System is or has been performed arising out of actions or inactions by Vemon; or (i) third party claims of any kind, including but not limited to contractual indemnity obligations which SoCalGas may have assumed in connection with the construction, operation and maintenance of Vernon's Gas System or SoCalGas' service thereto, whether based upon negligence, strict liability or otherwise, arising out of or connected in any manner to Vernon's or its agents or any party acting on behalf or under the direction of Vemon actsor omissions in construction, operating or maintaining Vemon's Gas System. This indemnification obligation shall not apply to the extent that injuries, death, loss, damage or destruction is caused by either the willful misconduct of SoCalGas or SoCalGas' sole negligence. 2 4.2 If any claim or action is brought against SoCalGas arising out of or related to this Agreement or the construction, operation or maintenance of Vernon's Gas System and SoCalGas' service thereto, then Vemon shall be entitled to participate in and, unless in the opinion of counsel for SoCalGas a conflict of interest between SoCalGas and Vernon may exist with respect to such claim or action, assume the defense of such claim or action, with counsel reasonably acceptable to SoCalGas. If Vernon does not assume the defense ofSoCalGas, or if a conflict precludes SoCalGas :from assuming the defense, then Vernon shall reimburse SoCalGas on a monthly basis for SoCalGas' reasonable defense costs through separate counsel ofSoCalGas' choice. Even if Vernon assumes the defense of SoCalGas with acceptable counsel, SoCalGas, at its sole option and expense, may participate in the defense with counsel ofSoCalGas' own choice withol,lt relieving Vernon of any of its obligations hereunder. 4.3 'Vernon shall indemnify, defend and hold SoCalGas hannless from and against any and all claims, losses, damages, costs and expenses (including incidental costs incurred) of any kind whatsoever related to the filing of any mechanics' lien or any claim by a subcontractor of Vernon related to the construction, operation or maintenance of Vernon's Gas System or SoCalGas' service thereto. 4.4 Vernon's obligation to indemnify SoCalGas shall not be limited in any way by any limitation on the amount or type of damages, compensation, penalty or benefits payable by or for Vemon under any statutory scheme, including without limitation, any Workers Compensation Acts, Disability Benefit Acts or other Employee Benefit Acts. IN WITNESS WHEREOF, the authorized representative(s) of the parties have executed both duplicate originals as of the date written above. VERNON By: /. SOUTHERN CALIFORNIA GAS COMPANY '/~BY: Name: Bruce V. Mal kenhorst Name: Title: City Administrator Date: February 16, 2005 Title: Date: 3 '., .. . . EXHIBITl Vernon's Gas System The City of Vernon gas $ystem comprises approximately 36,000 ft. of 10-inch transmission system operating with an MAOP of650psig that is served at two locations (Bandini/Downey and FruitlandlDowney) from SoCalGas Transmission Line 765. Two regulator stations are located along the lO-inch transmission system at BandiniIDowney and FruitlandlDowney. These regulator stations distribute gas from the transmission system into the distribution system operating at 60 psig MAOP. The distribution system ,consists of approximately 215,000 ft. of ~inch PE piping located in the majority of the city; Pleased see attached Exhibit 1.1 map ofVemon's nafural gas distribution system. VERNON By: ~ Name: Bruce V. MaJkenhorst Title: , City Administrato,r 3/f'~5 Date: 4 '" '". "" > '~. ID ... .. 0 III @ N (,l ~ Q 01 III J " I I I I ~ . , I o.....III.~ In;;i~1 Cl I I AIIII I ~i d il~ I I I I ~l ~ ~ I 0 EXHIBIT 1.1 CITY COUNCIL C' JOHN KARNS LEONIS C.MALBURG Karns&Karabian Mayor General Counsel THOMAS A.YBARRA KEVIN WILSON Mayor Pro-Tem Director of Community Services&Water WM. 'BILL"DAVIS Councilman STEVEN E.PARKER H."LARRY" GONZALES Fire Chief Councilman W.MICHAEL McCORMICK SOL BENUDIZ Councilman Police Chief BRUCE V.MALKENHORST LEWIS J.POZZEBON City Administrator/City Clerk Director of Environmental Health Chief Executive Officer of CITY HALL Light&Power RORY BURNETT ERIC T.FRESCH 4305 SANTA FE AVENUE,VERNON,CALIFORNIA 90058 coney,Schneider&Co.LLP City Attorney TELEPHONE(323)587-8811 City Accountant March 10, 2005 Finance Committee City of Vernon Honorable Members: i In anticipation of the upcoming start-up of the Malburg Generating Station, an Indemnity Agreement with Southern California Gas Company (SoCalGas) , dated February 16, 2005, was executed. SoCalGas submitted a revised Exhibit 1 for said agreement that has been accepted by the City. This has been reviewed by the City Attorney and it is hereby recommended that the execution of the Indemnity Agreement with SoCalGas and the acceptance of the revised Exhibit 1 be ratified. Very truly yours, Bruce V. Malkenhorst Director of Finance BVM/ng "Exclusively Industrial" .7 Indemnity Agreement Between City of Vernon and Southern California Gas Company February 16,2005 v/6 This agreement ("Agreement")is entered into and effective as of February 16, 2005 ("Effective Date"),by and between Vernon, a California municipal corporation("Vernon"or"City")and Southern California Gas Company, a California corporation("SoCalGas"or"Company"), collectively,the"Parties" or, individually,the "Party". en 1.0 General 1.1 The City of Vernon has requested the Southern California Gas Company to provide wholesale gas service pursuant to SoCalGas'published tariff Schedule GW-VRN, Wholesale Natural Gas Service to Vernon's newly constructed natural gas distribution system, described in detail in Exhibit 1 attached hereto, ("Vernon's Gas System") / 1.2 In furtherance of such request, Vernon has provided SoCalGas with certain data, including but not limited to testing records (pressure tests, welding, CP, etc.), installation procedures, mapping documents, and material specifications, etc. upon which SoCalGas may or will rely to satisfy itself under appropriate DOT and SoCalGas' rules, regulations, and procedures, published or unpublished that it can turn the gas on to Vernon's Gas System. As a normal course of business, SoCalGas reviews available information to determine if it can operate a new interconnection with an end-user in accordance with applicable safety requirements and ordinances prior to initiation of service. Vernon warrants without exception that these materials Vernon has provided to SoCalGas are true, complete and accurate and that SoCalGas can rely on such truth, completeness and accuracy in deciding to begin and continue the provision of the above referenced gas service to Vernon. 2.0 Safety Vernon further warrants that its gas system is safe and meets appropriate DOT rules, regulations, and procedures. Vernon warrants it will provide information to SoCalGas for any purpose as reasonably required in accordance with good utility practice. 3.0 Tax Responsibility In furtherance of our understanding and agreement, neither Vernon nor its employees nor its agents shall be deemed employees of SoCalGas or its affiliates for any purpose whatsoever by virtue of any services provided by SoCalGas. Vernon is responsible for the construction, operation and maintenance of its gas system and neither Vernon nor its employees, contractors' agents or representatives shall be on the payroll or deemed to be on the payroll of SoCalGas or entitled to any benefits extended to SoCalGas' employees or employees of its affiliates. Vernon shall be solely liable for withholding and remitting payment of all taxes relating to the operation of its gas system including, but not limited to state and federal income taxes, Social Security tax, self- employment tax, unemployment insurance premiums, and disability insurance contributions. 4.0 Indemnification 4.1 As between SoCalGas and Vernon, Vernon shall be solely responsible for and shall indemnify, defend and hold SoCalGas, its current and future parent and affiliates and their respective directors, officers, shareholders, employees, agents, representatives, successors and assigns, harmless from and against any and all claims, actions, suits, proceedings, losses, liabilities,penalties, fines, damages, costs or expenses including Without limitation, attorneys' fees(including costs, fees and disbursements of in- house and outside counsel) of any kind whatsoever resulting from: (a) injuries to or death of any and all individuals, including, without limitation, members of the general public, or any employee, agent, independent contractor or consultant or affiliate of either Party, arising out of or connected in any manner with the construction, operation and maintenance of Vernon's gas system and/or SoCalGas' services thereto; (b)damage to, loss of, and/or destruction of property, including, without limitation, to,property of SoCalGas,Vernon or others arising out of or connected in any manner with the construction, operation and maintenance of Vernon's Gas System and/or SoCalGas' services thereto; (c) any unauthorized release of a hazardous material by Vernon or its agents or any party acting on behalf or under the direction of Vernon; (d) any enforcement or compliance proceeding commenced by or in the name of any governmental agency because of an alleged, threatened or actual violation of any safety or environmental law, rule or regulation by Vernon ; (e)any action reasonably necessary to abate, remediate or prevent a violation or threatened violation of any safety or environmental law rule or regulation by Vernon or its agents or any party acting on behalf or under the direction of Vernon ; (f) claims, suits,damages, loss, liability, or actions for indemnity by the County of Los Angeles or any city adjacent to Vernon which is affected by the construction, operation and maintenance of Vernon's Gas System; (g) claims, suits, damages, loss, liability, or actions for indemnity by governmental agencies issuing permits in connection with the the construction, operation and maintenance of Vernon's Gas System arising out of actions or inactions of Vernon ; (h) claims, suits, damages, loss, liability, or actions for indemnity by the owner or tenants of the property in the vicinity of, adjacent to, or on which any part of the construction, operation and maintenance of Vernon's Gas System is or has been performed arising out of actions or inactions by Vernon ; or(i) third party claims of any kind, including but not limited to contractual indemnity obligations which SoCalGas may have assumed in connection with the construction, operation and maintenance of Vernon's Gas System or SoCalGas' service thereto,whether based upon negligence, strict liability or otherwise,arising out of or connected in any manner to Vernon's or its agents or any party acting on behalf or under the direction of Vernon acts or omissions in construction, operating or maintaining Vernon's Gas System . This indemnification obligation shall not apply to the extent that injuries, death, loss, damage or destruction is caused by either the willful misconduct of SoCalGas or SoCalGas' sole negligence. 2 4.2 If any claim or action is brought against SoCalGas arising out of or related to this Agreement or the construction, operation or maintenance of Vernon's Gas System and SoCalGas' service thereto, then Vernon shall be entitled to participate in and,unless in the opinion of counsel for SoCalGas a conflict of interest between SoCalGas and Vernon may exist with respect to such claim or action, assume the defense of such claim or action, with counsel reasonably acceptable to SoCalGas. If Vernon does not assume the defense of SoCalGas, or if a conflict precludes SoCalGas from assuming the defense,then Vernon shall reimburse SoCalGas on a monthly basis for SoCalGas' reasonable defense costs through separate counsel of SoCalGas' choice. Even if Vernon assumes the defense of SoCalGas with acceptable counsel, SoCalGas, at its sole option and expense, may participate in the defense with counsel of SoCalGas' own choice without relieving Vernon of any of its obligations hereunder. 4.3 Vernon shall indemnify, defend and hold SoCalGas harmless from and against any and all claims, losses, damages, costs and expenses (including incidental costs incurred) of any kind whatsoever related to the filing of any mechanics' lien or any claim by a subcontractor of Vernon related to the construction, operation or maintenance of Vernon's Gas System or SoCalGas' service thereto. 4.4 Vernon's obligation to indemnify SoCalGas shall not be limited in any way by any limitation on the amount or type of damages;compensation, penalty or benefits payable by or for Vernon under any statutory scheme, including without limitation, any Workers Compensation Acts, Disability Benefit Acts or other Employee Benefit Acts. . IN WITNESS WHEREOF,the authorized representative(s) of the parties have executed both duplicate originals as of the date written above. VERNON J SOUTHERN CALIFORNIA GAS COMPANY By: � Name: Bruce V. Mal kenhorst Name: Title:_ City Administrator Title: Date: February 16, 2005 Date: 3 EXHIBIT 1 Vernon's Gas System The City of Vernon gas system comprises approximately 36,000 ft. of 10-inch transmission system operating with an MAOP of 650 psig that is served at two locations (Bandini/Downey and Fruitland/Downey) from SoCalGas Transmission Line 765. Two regulator stations are located along the 10-inch transmission system at Bandini/Downey and Fruitland/Downey. These regulator stations distribute gas from the transmission system into the distribution system operating at 60 psig MAOP. The distribution system consists of approximately 215,000 ft of 6-inch PE piping located in the majority of the city. 4 INTEROFFICE MEMORANDUM Light & Power Department— Bulk Power & Gas Division Date: 02/16/05 To: Manuel Garcia/Assistant Director of Resource Management From: Daniel E. Garcia/Bulk Power Manager Subject: Indemnity Agreement with So Cal Gas Manuel, Attached you will find the revised final Indemnity Agreement with So Cal Gas. I recommend that we sign this agreement as revised and after review by COV legal. Should you have any questions please call me. EXHIBIT 1 Vernon's Gas System The City of Vernon gas system comprises approximately 36,000 ft. of 10-inch transmission system operating with an MAOP of 650 psig that is served at two locations (Bandini/Downey and Fruitland/Downey) from SoCalGas Transmission Line 765. Two regulator stations are located along the 10-inch transmission system at Bandini/Downey and Fruitland/Downey. These regulator stations distribute gas from the transmission system into the distribution system operating at 60 psig MAOP. The distribution system consists of approximately 215,000 ft of 6-inch PE piping located in the majority of the city. Please see attached Exhibit 1.1 map of Vernon's natural gas distribution system. EXHIBIT 1 Vernon's Gas System The City of Vernon gas system comprises approximately 36,000 ft. of 10-inch transmission system operating with an MAOP of 650 psig that is served at two locations (Bandini/Downey and Fruitland/Downey) from SoCalGas Transmission Line 765. Two regulator stations are located along the 10-inch transmission system at Bandini/Downey and Fruitland/Downey. These regulator stations distribute gas from the transmission system into the distribution system operating at 60 psig MAOP. The distribution system consists of approximately 215,000 ft of 6-inch PE-piping located in the majority of the city. Please see attached Exhibit 1.1 map of Vernon's natural gas distribution system. FROM THE CITY ATTORNEY'S OFFICE INTER OFFICE MEMORANDUM DATE: March 7, 2005 V TO: Bruce V. Malkenhorst, City Clerk/City Administrator U FROM: Eric T. Fresch, City Attorney SUBJECT: Revised Indemnity Agreement with SoCliGas VV I have reviewed the revision to the Indemnity Agreement with SoCalGas and recommend your signature of approval on attached Exhibit 1 to the agreement. I look forward to discussing this matter with you at your earliest convenience. ETF:ah Attachment c: Manuel G. Garcia, Generation Operations Manager INTEROFFICE MEMORANDUM Light and Power - Operations DATE: March 7,2005 TO: Bruce V.Malkenhorst, City Administrator/CEO of Light& Power FROM: Manuel G. Garcia, Generation Operations Manager SUBJECT: Revised Indemnity Agreement with SoCalGas I recommend that the attached Revised Indemnity Agreement, Exhibit 1 with SoCalGas be approved and signed. The revised Exhibit 1 has been reviewed by the City Attorney's office. If you have any questions, please contact me. MGG:ah Attachment Indemnity Agreement Between City of Vernon and Southern California Gas Company February 16,2005 This agreement("Agreement") is entered into and effective as of February 16, 2005 ("Effective Date"), by and between Vernon, a California municipal corporation ("Vernon"or"City") and Southern California Gas Company, a California corporation("SoCalGas" or"Company"), collectively, the "Parties" or, individually, the"Party". 1.0 General 1.1 The City of Vernon has requested the Southern California Gas Company to provide wholesale gas service pursuant to SoCalGas'published tariff Schedule GW-VRN, Wholesale Natural Gas Service to Vernon's newly constructed natural gas distribution system, described in detail in Exhibit 1 attached hereto, ("Vernon's Gas System") 1.2 In furtherance of such request, Vernon has provided SoCalGas with certain data, including but not limited to testing records (pressure tests, welding, CP, etc.), installation procedures,mapping documents, and material specifications, etc. upon which SoCalGas may or will rely to satisfy itself under appropriate DOT and SoCalGas' rules,regulations, and procedures,published or unpublished that it can turn the gas on to Vernon's Gas System. As a normal course of business, SoCalGas reviews available information to determine if it can operate a new interconnection with an end-user in accordance with applicable safety requirements and ordinances prior to initiation of service. Vernon warrants without exception that these materials Vernon has provided to SoCalGas are true, complete and accurate and that SoCalGas can rely on such truth, completeness and accuracy.in deciding to begin and continue the provision of the above referenced gas service to Vernon. 2.0 Safety Vemon further warrants that its gas system is safe and meets appropriate DOT rules, regulations, and procedures. Vernon warrants it will provide information to SoCalGas for any purpose as reasonably required in accordance with good utility practice. 3.0 Tax Responsibility In furtherance of our understanding and agreement, neither Vernon nor its employees nor its agents shall be deemed employees of SoCalGas or its affiliates for any purpose whatsoever by virtue of any services provided by SoCalGas. Vernon is responsible for the construction, operation and maintenance of its gas system and neither Vernon nor its employees, contractors' agents or representatives shall be on the payroll or deemed to be on the payroll of SoCalGas or entitled to any benefits extended to SoCalGas' employees or employees of its affiliates: Vernon shall be solely liable for withholding and remitting payment of all taxes relating to the operation of its gas system including, but not limited to state and federal income taxes, Social Security tax, self- . ' employment tax, unemployment insurance premiums, and disability insurance contributions. 4.0 Indemnification 4.1 As between SoCalGas and Vernon, Vernon shall be solely responsible for and shall indemnify,defend and hold SoCalGas, its current and future parent and affiliates and their respective directors, officers, shareholders, employees, agents,representatives, successors and assigns,harmless from and against any and all claims, actions, suits, proceedings, losses, liabilities, penalties, fines, damages, costs or expenses including without limitation, attorneys' fees (including costs, fees and disbursements of in- house and outside counsel) of any kind whatsoever resulting from: (a) injuries to or death of any and all individuals, including, without limitation, members of the general public, or any employee, agent, independent contractor or consultant or affiliate of either Party, arising out of or connected in any manner with the construction, operation and maintenance of Vernon's gas system and/or SoCalGas' services thereto; (b) damage to, loss of, and/or destruction-of property, including, without limitation, to,property of SoCalGas,Vernon or others arising out of or connected in any manner with the construction, operation and maintenance of Vernon's Gas System and/or SoCalGas' services thereto; (c) any unauthorized release of a hazardous material by Vernon or its agents or any party acting on behalf or under the direction of Vernon; (d) any enforcement or compliance proceeding commenced by or in the name of any governmental agency because of an alleged,.threatened or actual violation of any safety or environmental law, rule or regulation by Vernon ; (e) any action reasonably necessary to abate, remediate or prevent a violation or threatened violation of any safety or environmental law rule or regulation by Vernon or its agents or any party acting on behalf or under the direction of Vernon ; (f) claims, suits, damages, loss, liability, or actions for indemnity by the County of Los Angeles or any city adjacent to Vernon which is affected by the construction, operation and maintenance of Vernon's Gas System; (g) claims, suits, damages, loss, liability, or actions for indemnity by governmental agencies issuing permits in connection with the the construction, operation and maintenance of Vernon's Gas System arising out of actions or inactions of Vernon ; (h) claims, suits, damages, loss, liability, or actions for indemnity by the owner or tenants of the property in the vicinity of, adjacent to, or on which any part of the construction, operation and maintenance of Vernon's Gas System is or has been performed arising out of actions or inactions by Vernon ; or(i)third party claims of any kind, including but not limited to contractual indemnity obligations which SoCalGas may have assumed in connection with the construction, operation and maintenance of Vernon's Gas System or SoCalGas' service thereto, whether based upon negligence, strict liability or otherwise,arising out of or connected in any manner to Vernon's or its agents or any party acting on behalf or under the direction . of Vernon acts or omissions in construction, operating or maintaining Vernon's Gas System . This indemnification obligation shall not apply to the extent that injuries, death, loss, damage or destruction is caused by either the willful misconduct of SoCalGas or SoCalGas' sole negligence. 2 4.2 If any claim or action is brought against SoCalGas arising out of or related to this Agreement or the construction, operation or maintenance of Vernon's Gas System and SoCalGas' service thereto, then Vernon shall be entitled to participate in and, unless in the opinion of counsel for SoCalGas a conflict of interest between SoCalGas and Vernon may exist with respect to such claim or action, assume the defense of such claim or action,with counsel reasonably acceptable to SoCalGas. If Vernon does not assume the defense of SOCalGas' or if a conflict precludes SoCalGas from assuming the defense, then Vernon shall reimburse SoCalGas on a monthly basis for SoCalGas'reasonable defense costs through separate counsel of SoCalGas' choice. Even if Vernon assumes the defense of SoCalGas with acceptable counsel, SoCalGas, at its sole option and expense, may participate in the defense with counsel of SoCalGas' own choice without relieving Vernon of any of its obligations hereunder. 4.3 Vernon shall indemnify, defend and hold SoCalGas harmless from and against any and all claims, losses, damages, costs and expenses (including incidental costs incurred) of any kind whatsoever related to the filing of any mechanics' lien or any claim by a subcontractor of Vernon related to the construction, operation or maintenance of Vernon's Gas System or SOCalGas' service thereto. 4.4 Vernon's obligation to indemnify SoCalGas shall not be limited in any way by any limitation on the amount or type of damages;compensation, penalty or benefits payable by or for Vernon under any statutory scheme, including without limitation, any Workers Compensation Acts; Disability Benefit Acts or other Employee Benefit Acts. IN WITNESS WHEREOF,the authorized representative(s) of the.parties have executed both duplicate originals as of the date written above. VERNON SOUTHERN CALIFORNIA GAS COMPANY Name: Bruce V. Malkenhorst Name: Title: City Administrator Title: Date: February 16, 2005 Date: 3 EXHIBIT 1 �9 Vernon's Gas System i ,f� The City of Vernon gas system comprises approximately 36,000 ft. of 10-inch transmission system operating with an MAOP of 650 psig that is served at two locations (Bandini/Downey and Fruitland/Downey) from SoCalGas Transmission Line 765. Two regulator stations are located along the 10-inch transmission system at Bandini/Downey and Fruitland/Downey. These regulator stations distribute gas from the transmission system into the distribution system operating at 60 psig MAOP. The distribution system consists of approximately 215,000 ft of 6-inch PE piping located in the majority of the city. 4 FxiMBrr 1 Vernon's Gas System The City of Vernon gas system comprises approximately 36,000 ft. of 10-inch transmission system operating with an MAOP of 650 psig that is served at two locations(Bandini/Downey and Fruitland/Downey) from SoCalGas Transmission Line 765. Two regulator stations are located along the 10-inch transmission system at Bandini/Downey and Fruitland/Downey. These regulator stations distribute gas from the transmission system into the distribution system operating at 60 psig MAOP. The distribution system consists of approximately 215,000 ft. of 6-inch PE piping located in the majority of the city: Pleased see attached Exhibit 1.1 map of Vernon's natural gas distribution system. VERNON By: Name: Bruce V. Malkenhorst Title: City Administrator Date: 4 Indemnity Agreement Between City of Vernon and Southern California Gas Company February 16,2005 This agreement("Agreement") is entered into and effective as of February 16, 2005 ("Effective Date"), by and between Vernon, a California municipal corporation (."Vernon"or"City") and Southern California Gas Company, a California corporation("SoCalGas" or"Company"), collectively, the "Parties" or, individually,the "Party". 1.0 General 1.1 The City of Vernon has requested the Southern California Gas Company to provide wholesale gas service pursuant to SoCalGas'published tariff Schedule GW-VRN, Wholesale Natural Gas Service to Vernon's newly constructed natural gas distribution system, described in detail in Exhibit 1 attached hereto, ("Vernon's Gas System") 1.2 In furtherance of such request, Vernon has provided SoCalGas with certain data, including but not limited to testing records (pressure tests, welding, CP, etc.), installation procedures, mapping documents, and material specifications, etc. upon which SoCalGas may or will rely to satisfy itself under appropriate DOT and SoCalGas' rules, regulations, and procedures,published or unpublished that it can turn the gas on to Vernon's Gas System. As a normal course of business, SoCalGas reviews available information to determine if it can operate a new interconnection with an end-user in accordance with applicable safety requirements and ordinances prior to initiation of service. Vernon warrants without exception that these materials Vernon has provided to SoCalGas are true,complete and accurate and that SoCalGas can rely on such truth, completeness and accuracy in deciding to begin and continue the provision of the above referenced gas service to Vernon. 2.0 Safety Vernon further warrants that its gas system is safe and meets appropriate DOT rules, regulations, and procedures. Vernon warrants it will provide information to SoCalGas for any purpose as reasonably required in accordance with good utility practice. 3.0 Tax Responsibility In furtherance of our understanding and agreement, neither Vernon nor its employees nor its agents shall be deemed employees of SoCalGas or its affiliates for any purpose whatsoever by virtue of any services provided by SoCalGas. Vernon is responsible for the construction, operation and maintenance of its gas system and neither Vernon nor its employees, contractors' agents or representatives shall be on the payroll or deemed to be on.the payroll of SoCalGas or entitled to any benefits extended to SoCalGas' employees or employees of its affiliates: Vernon shall be solely liable for withholding and remitting payment of all taxes relating to the operation of its gas system including, but not limited to state and federal income taxes, Social Security tax, self- employment tax, unemployment insurance premiums, and disability insurance contributions. 4.0 Indemnification 4.1 As between SoCalGas and Vernon, Vernon shall be solely responsible for and shall indemnify, defend and hold SoCalGas, its current.and future parent and affiliates and their respective directors, officers, shareholders, employees, agents, representatives, successors and assigns, harmless from and against any and all claims, actions, suits, proceedings, losses, liabilities,penalties, fines, damages, costs or expenses including without limitation, attorneys' fees (including costs, fees and disbursements of in- house and outside counsel) of any kind whatsoever resulting from: (a) injuries to or death of any and all individuals, including, without limitation, members of the general public, or any employee, agent, independent contractor or consultant or affiliate of either Party, arising out of or connected in any manner with the construction, operation and maintenance of Vernon's gas system and/or SoCalGas'services thereto; (b) damage to, loss of, and/or destruction.of property, including, without limitation, to,property of SoCalGas,Vernon or others arising out of or connected in any manner with the construction, operation and maintenance of Vernon's Gas System and/or SoCalGas' services thereto; (c)any unauthorized release of a hazardous material by Vernon or its agents or any party acting on behalf or under the direction of Vernon; (d)any enforcement or compliance proceeding commenced by or in the name of any governmental agency because of an alleged,threatened or actual violation of any safety or environmental law, rule or regulation by Vernon ; (e) any action reasonably necessary to abate, remediate or prevent a violation or threatened violation of any safety or environmental law rule or regulation by Vernon or its agents or any party acting on behalf or under the direction of Vernon ; (f) claims, suits, damages, loss, liability, or actions for indemnity by the County of Los Angeles or any city adjacent to Vernon which is affected by the construction, operation and maintenance of Vernon's Gas System; (g) claims, suits, damages, loss, liability, or actions for indemnity by governmental agencies issuing permits in connection with the the construction, operation and maintenance of Vernon's Gas System arising out of actions or inactions of Vernon ; (h) claims, suits, damages, loss, liability, or actions for indemnity by the owner or tenants of the property in the vicinity of, adjacent to, or on which any part of the construction, operation and maintenance of Vernon's Gas System is or has been performed arising out of actions or inactions by Vernon; or(i)third party claims of any kind, including but not limited to contractual indemnity obligations which SoCalGas may have assumed in connection with the construction, operation and maintenance of Vernon's Gas System or SoCalGas' service thereto, whether based upon negligence, strict liability or otherwise, arising out of or connected in any manner to Vernon's or its agents or any party acting on behalf or under the direction of Vernon acts or omissions in construction, operating or maintaining Vernon's Gas System . This indemnification obligation shall not apply to the extent that injuries, death, loss, damage or destruction is caused by either the willful misconduct of SoCalGas or SoCalGas' sole negligence. 2 4.2 If any claim or action is brought against SoCalGas arising out of or related to this Agreement or the construction, operation or maintenance of Vernon's Gas System and SoCalGas' service thereto, then Vernon shall be entitled to participate in and, unless in the opinion of counsel for SoCalGas a conflict of interest between SoCalGas and Vernon may exist with respect to such claim or action, assume the defense of such claim or action, with counsel reasonably acceptable to SoCalGas. If Vernon does not assume the defense of SoCalGas, or if a conflict precludes SoCalGas from assuming the defense,then Vernon shall reimburse SoCalGas on a monthly basis for SoCalGas'reasonable defense costs through separate counsel of SoCalGas' choice. Even if Vernon assumes the defense of SoCalGas with acceptable counsel, SoCalGas, at its.sole option and expense,may participate in the defense with counsel of SoCalGas' own choice without relieving Vernon of any of its obligations hereunder. 4.3 Vernon shall indemnify, defend and hold SoCalGas harmless from and against any and all claims, losses, damages, costs and expenses (including incidental costs incurred) of any kind whatsoever related to the filing of any mechanics' lien or any claim by a subcontractor of Vernon related to the construction, operation or maintenance of Vernon's Gas System or SoCalGas' service thereto. 4.4 Vernon's obligation to indemnify SoCalGas shall not be limited in any way by any limitation on the amount of type of damages;compensation, penalty or benefits payable by or for Vernon under any statutory scheme, including without limitation, any Workers Compensation Acts, Disability Benefit Acts or other Employee Benefit Acts. IN WITNESS WHEREOF,the authorized representative(s) of the parties have executed both duplicate originals as of the date written above. VERNON SOUTHERN CALIFORNIA GAS COMPANY By: By: Name: Bruce V. Malkenhorst Name: Title: City Administrator Title: Date: February 16, 2005 Date: 3 EXIMIT 1 Vemon's Gas System The City of Vernon gas system comprises approximately 36,000 ft. of I0-inch transmission system operating with an MAOP of 650psig that is served at two locations(Bandini/Downey and Fruitland/Downey) from SoCalGas Transmission Line 765. Two regulator stations are located along the 10-inch transmission system at Bandini/Downey and.Fruitland/Downey. These regulator stations distribute gas from the transmission system into the distribution system operating at 60 psig MAOP. The distribution system consists of approximately 215,000 ft. of 64nch PE piping located in the majority of the city: Pleased see attached Exhibit 1.1 map of Vernon's natural gas distribution system. VERNON- By: Name: Bruce V. Malkenhor t Title: CityAdministrator Date: d 4 CITY ADMINISTRATOR/CITY CLERK' S INTER-OFFICE MEMORANDUM DATE: March 28, 2005 TO: Manual Garcia, Generation Operations Manager/ MGS Project Manager FROM� ,w� Nelly Giron, Deputy City Clerk Re : ( IVY�VI Resolution No. 8695 - Approving and Ratifying the Execution of a Delegation Agreement Transmitted herewith is a copy of the above-referenced resolution for your file that was approved by City Council on March 16, 2005 . Please ensure that one fully executed original agreement is submitted to the City Clerk' s office. Thank you. NG:rcm CC: Resolution No. 8695 Agreement No. 05-041