RESOLUTION NO. 8811
3
4
5
6
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON APPROVING AND AUTHORIZING THE EXECUTION OF A
LETTER AGREEMENT BY AND BETWEEN THE CITY OF VERNON
AND THE LOS ANGELES JUNCTION RAILWAY COMPANY
REGARDING WATER AND SEWER LINE INSTALLATION AS PART
OF CONTRACT NO. 592
7
WHEREAS, on June 1, 2005, the City Council of the City of
Vernon adopted Resolution No. 8758 approving Contract No. 592 for the
District Boulevard and Fruitland Avenue Sewer Main Replacement, Central
8
9
10
Manufacturing District (CMD) Sewer Phase III (the "Sewer Improvement
11
Project"); and
WHEREAS, construction of the Sewer Improvement Project will
be located near two Los Angeles Junction Railway Company railroad
tracks; and
WHEREAS, pursuant to Contract No. 592, a contractor will be
required to install new water and sewer pipelines under the railroad
tracks of Los Angeles Junction Railway Company through an open trench
operation on District Boulevard at 48th Street in the City of Vernon
(Crossing No. 25B-1.01C); and
WHEREAS, the Los Angeles Junction Railway Company has
provided written approval for the work near its tracks subject to
certain construction requirements, and the City signing a statement of
indemnification holding Los Angeles Junction Railway Company harmless
against all damages that may occur during the installation of the
proposed water and sewer lines; and
WHEREAS, the proposed work to be performed will be divided
into two phases, the first phase will be the installation of the water
line in the north side or toward the Los Angeles River side and the
-,
., ~'"
.'
1 second phase will involve a sewer line on the south side of District
2 Boulevard; and
3 WHEREAS, by memo dated July 13, 2005, Kevin Wilson, the
4 Director of Community Services & Water, has recommended that a letter
5 agreement with Los Angeles Junction Railway Company be approved and
6 executed so that the proposed sewer and water lines can be installed
7 as part of Contract No. 592.
8 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
9 CITY OF VERNON AS FOLLOWS:
10
SECTION 1:
The City Council of the City of Vernon hereby
11 finds and determines that the recitals contained hereinabove are true
12 and correct.
13
SECTION 2:
The City Council of the City of Vernon hereby
14 approves the Letter Agreement with Los Angeles Junction Railway
15 Company, a copy of which is attached hereto as Exhibit A and
16 incorporated by reference.
17
SECTION 3:
The City Council of the City of Vernon hereby
18 authorizes the Mayor to execute said Letter Agreement for, and on
19 behalf of, the City of Vernon and the Acting City Clerk is hereby
20 authorized to attest thereto.
21
22
23
24
25
26
27
28
SECTION 4:
The City Council of the City of Vernon hereby
directs the Acting City Clerk, or his designee, to send a copy of a
fully executed Agreement to:
Los Angeles Junction Railway Company
Attn. R~W. Edwards, General Manager
4433 Exchange Avenue
Los Angeles, CA 90058
/ / /
/ / /
- 2 -
5
6
7 ATTEST.
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
-,
.1 '
,.r__ "."1'
1 SECTION 5: The Acting City Clerk of the City of Vernon
2 shall certify to the passage of this resolution, and thereupon and
3 thereafter the same shall be in full force and effect.
4 APPROVED AND ADOPTED this 20th day of July, 2005.
, Acting
v. MALKENHORST JR.
- 3 -
.
. .
1 STATE OF CALIFORNIA
2
3
ss
COUNTY OF LOS ANGELES
4
I, BRUCE V. MALKENHORST, Acting City Clerk of the City of Vernon,
do hereby certify that the foregoing Resolution, being Resolution No.
8811, was duly adopted by the City Council of the City of Vernon at a
regular meeting of the City Council duly held on Wednesday, July 20,
2005, and thereafter was duly signed by the Mayor of the City of
5
6
7
8
9
Vernon.
10
11
12
13 (SEAL)
14
15
16
,
BRUCE V. MALKENHO T JR., ACTING CITY CLER
17
18
19
20
21
22
23
24
25
26
27
28
- 4 -
EXHIBIT
A
. ,. .r'
et'
. . .
"
l2s AJ\geles JUt\etioJ\. R&Jlwa~ Companl
..
4433 EXCHANGE AVENUE
LOS ANGELES. CA 90058
TELEPHONE (323) 277.2004 . FAX (323) 277.2009
June 28, 2005
320-14
Mr. E. Maximous
P. E., Civil Engineer
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
RE: Open Trenches for Water and Sewer Line Installation on DistrictBlvd.
at48lh Street in the City of Vernon (Crossing No. 25B-1.01C)
Dear Sir:
This letter will serve to confirm our conversation with Mr. Pin Chan and the plan review for the
proposed water and sewer lines under the Los Angeles Junction Railway Company (LAJ) railroad
tracks at the above referred to location.
I am in agreement with your drawings, 82513 - Sheet 8 of 10 and WD2579 - Sheet 1 of 1,
and further agree to allow you to open trench under our tracks on the following conditions:
1. Backfill by using slurry (3 sacks) concrete up to 8" from the bottom of tie.
2. " Support for rail is not possible.
3. Open trenches must be shored by OSHA guidelines.
4. LAJ will need at least 72 hours notification when work is anticipated under or near the
tracks. "
5. LAJ track charts indicate a possibility of a 310 track crossing District Blvd. in this project
area. In the evenUrack is located it will remain in place.
6. The project is divided into two phases, the first phase will be the installation of the
water line in the north side or toward the L.A. River side and the second phase will
involve a sewer line on the south side of District Blvd. There will be a short time span
separation between the two projects. The result will be two weekends (3 days each)
for open trenching that the tracks will remain out of service.
Page 1 of 2
.
. ,
"
.
.,
. ,
" .... ( ..~..
6128105
320-14
Page 2 012
7. That the City of Vernon and/or your contractor(s) agree(s) to release, indemnify and
hold LAJ harmless from and against all costs, expenses, claims and liabilities for injury
to or death of any persons, and for damages to or loss of any property, resulting from,
arising out of, or in any way connected with the installation of the proposed water and
sewer lines.
If the above conditions meet with your approval please have the appropriate representative
sign and return a copy of the letter acknowledging acceptance of the terms thereof.
R. W. Edwards
General Manager
Acknowtedged:
Date:
Signature LEONIS C. MALBURG, Mayor
ATTEST:
By:
f~ BRUCE V. MALKENHORST, Acting City Clerk
APPROVED AS TO FORM:
~ ERIC T. FRESCH, City Attorney
. SUPPORTING
DOCUMENTS
-'
/."
t
128 ~ieles J\1.t\e1iol\.RailWa.l Comp&J\l
4433 EXCHANGE AVENUE
LOS ANGELES. CA 90058
TELEPHONE (323) 277-2004 . FAX (323) 277-2009
June 28, 2005
320-14
Mr. E. Maximous
P. E., Civil Engineer
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
RE: Open Trenches for Water and Sewer Line Installation on DistricfBlvd.
at 48th Street in the City of Vernon (Crossing No. 25B-1.01C)
Dear Sir:
This letter will serve to confirm our conversation with Mr. Pin Chanand the plan review for the
proposed water and sewer lines under the Los Angeles Junction Railway Company (LAJ) railroad
tracks at the above referred to location.
I am in agreement with your drawings, 82513 - Sheet 8 of 10 and WD2579 - Sheet 1 of 1,
and further agree to allow you to open trench under our tracks on the following conditions:
1. Backfill by using slurry (3 sacks) concrete up to 8" from the bottom of tie.
2. . Support for rail is not possible.
3. Open trenches must be shored by OSHA guidelines.
4. LAJ will need at least 72 hours notification when work is anticipated under or near the
tracks. .
5. LAJ track charts indicate a possibility of a 3rd track crossing District Blvd. in this project
area. In the event track is located it will remain in place.
6. The project is divided into two phases, the first phase will be the installation of the
water line in the north side or toward the L.A. River side and the second phase will
involve a sewer line on the south side of District Blvd. There will be a short time span
separation between the two projects. The result will be two weekends (3 days each)
for open trenching that the tracks will remain out of service.
P*1of2
./.
, .
,
6128105
320-14
Page 2 012
7. That the City ofVemon and/or your contractor(s) agree(s) to release, indemnify and
hold LAJ harmless from and against all costs, expenses, claims and liabilities for injury
to or death of any persons,.and for damages to or loss of any property, resulting from,
arising out of, or in any way connected with the installation of the proposed water and
sewer lines.
If the above conditions meet with your approval please have the appropriate representative
sign and return a copy of the letter acknowledging acceptance of the terms thereof.
R. W. Edwards
General Manager
Acknowledged:
By:
~-BRUe-E-V-:-'MM:;IH~NHeRS-'F-, Acting City Clerk,
APPROVED AS TO FORM:
fC,ZA.
Da ERIC T.~SCH, City Attorn~
ate:
'7 ifl los-
t .
~.
SignatlJ'fe EONIS C. MALBU G, Mayor
ATTEST:
. MALKENHORST, JR.