Loading...
Resolution No. 90231 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 t RESOLUTION NO. 9023 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND AUTHORIZING THE EXECUTION OF A LETTER AGREEMENT BY AND BETWEEN THE CITY OF VERNON AND SOUTHERN CALIFORNIA EDISON COMPANY FOR MALBURG GENERATION STATION COMMUNICATIONS FACILITIES WHEREAS, on September 16, 1997, the City Council of the City of Vernon adopted Resolution No. 7017 which, among other things, approved a Laguna Bell -Vernon Interconnection Service Agreement (the "Agreement") between the Southern California Edison Company ("Edison") and the City of Vernon setting forth the parties' respective rights and obligations to provide necessary communications facilities such as a Remote Terminal Unit ("RTU"); and WHEREAS, on October 17, 2005, the City of Vernon commenced operation of its 134 mW Malburg Generation Station ("MGS") located within Vernon's city limits and interconnected to its 66 kV system (the "Project"); and WHEREAS, Edison has determined that it needs to remotely monitor Vernon's MGS by providing real-time data to Edison's Grid Control Center; and WHEREAS, the City and Edison desire to enter into a letter agreement clarifying the arrangement whereby Edison shall engineer, design, procure, construct and install the Edison MGS Communications Facilities and the City of Vernon shall engineer, design, procure and construct the Vernon MGS Communications Facilities; and WHEREAS, under the terms and conditions in the letter agreement, the City will pay all costs incurred by Edison to design, engineer, procure, construct and install the Edison MGS Communications El 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Facilities, in the estimated sum of $54,400.00 (the "Edison MGS Communications Facilities Cost"); and WHEREAS, Edison will perform all the necessary inspections, testing, certification and other work as.required by the appropriate agencies and obtain the necessary Federal Energy Regulatory Commission and/or California Public Utilities Commission approvals; and WHEREAS, within twelve (12) months following completion of the Edison MGS Communications Facilities, Edison shall determine the actual recorded Edison MGS Communications Facilities Cost, associated Income Tax Component of Contribution and One -Time Cost and invoice or refund the City the difference between the estimated charges and the actual recorded costs; and WHEREAS, the City will also be required to enter into an amendment to the Agreement, or a similar agreement, with Edison to include the terms for Edison to own, operate and maintain the Edison MGS Communications Facilities and Vernon to own, operate and maintain the Vernon MGS Communications Facilities; and WHEREAS, the Director of Light & Power has recommended that the Letter Agreement with Edison be approved and a check issued for the estimated Edison MGS Communications Facilities Cost. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true land correct. SECTION 2: The City Council of the City of Vernon hereby approves the Letter Agreement with Edison, in substantially the same form as the copy which is attached hereto as Exhibit A and - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 incorporated by reference, and approves the payment of costs in advance in the sum of $54,400.00. SECTION 3: The City Council of the City of Vernon hereby authorizes the Capital Project Administrator, or his designee, to make whatever nonsubstantive, administrative and/or text changes, upon advice of counsel, to the Letter Agreement. SECTION 4: The City Council of the City of Vernon hereby authorizes the Capital Project Administrator to execute said Letter Agreement for, and on behalf of, the City of Vernon. SECTION 5: The City Council of the City of Vernon hereby authorizes and empowers the Capital Project Administrator to execute such other agreements and documents and to take such actions as may be necessary or convenient to carry out the City's obligations hereunder and to effect the purposes of the Letter Agreement and the transactions therein authorized. SECTION 6: The City Council of the City of Vernon hereby directs the Acting City Clerk, or his designee, to send two fully executed Letter Agreements, together with the deposit of $54,400.00, Ito: Southern California Edison Company Attn. James A. Cuillier, FERC Rates & Regulation Manager 2244 Walnut Grove Avenue Rosemead, CA 91770 - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 7: The City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 19th day of April, 2006. ATTEST: BRUCE V. Acting C rk T, JR. EO IS C. MAL URG, Mayor, - 4 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, BRUCE V. MALKENHORST, JR., Acting City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 9023, was duly adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Wednesday, April 19, 2006, and thereafter was duly signed by the Mayor of the City of Vernon. I (S EAL ) BRUCE V. Acting C XENHORST, JR. Clerk - 5 EXHIBIT VI& 04/13/2006 07:08 FAX 323 826 1438 CITY CLERK'S OFFICE laoll Southern California Edison Company Rate Schedule FERC No. )= Original Sheet No. 1 [DD r0, /% IF T3 I • Mr. Donal O'Callaghan Director of Light and Power Light and Power Department City of Vernon 4305 Santa Fe Avenue Vernon, California 90058 • • r - :n • c � . a• Mid. � _..Y.S__ : 4.. a '��l- 1 _ Dear Mr. O'Callaghan: On October 17, 2005, the City of Vernon ("Vernon') commenced operation of its 134 MW Malburg Generation Station ("MGS°) located within Vernon's city limits and interconnected to its 66 W system (the' project'). Southern California. Edison Company ("Edison') has determined that it needs to remotely monitor Vernon's MGS by providing real-time data to Edison's Grid Control Center. Until the required remote terminal unit ("RTU'J and associated communications equipment have been placed in service. Edison and Vernon have agreed that Vernon will provide the necessary data to Edison pursuant to Edison's manual operating procedures. The Laguna Bell -Vernon Interconnection Service Agreement between Edison and Vernon (the "ISA') sets forth the parties' respective rights and obligations to provide necessary communications facilities such as the RTU. The ISA will be amended concurrently with the execution of this letter agreement ("Agreement°) to include the terns for (i) Edison to own, operate and maintain the facilities specified in EA bit A hereto required for the Project (the "Edison MGS Communications Facilities') and (H) Vernon to own, operate and maintain the facilities specified in Exhibit B hereto required for the Project (the "Vernon MGS Communications Facilities'). The purpose of this Agreement is to agree upon an arraugemeut pursuant to which (i) Edison will engineer, design, and procure material and equipment for, and construct, the' Edison MGS Communications Facilities, and (h) Vernon shall engineer, design, procure and constrict the Vernon MGS Communications Facilities, as described herein. 1. This Agreement shall become effective on the effective date ordered by the Federal Enerby Regulatory Committee ("FERC'). 2. Subject to Section 3 bellow, this Agreement shall tern i mate upon the earlier of the following to occur. (i) notice that this Agreement is not accepted for filing by FERC, or (ii) completion of the audit period specified in Section 13 below. Issued by: James A_ CuiHier Manager, FERC Rates & Regulation Issued on: Effective: 04/13/2006„09 FAI 323 826 1438 CITY CLERK'S OFFICE Q 012 Southem California Edison Company Rate Schedule FERC No. XXX Original Sheet No. 2 3. Vernon's obligations to pay charges and expenses incurred or irrevocably committed to be incurred pursuant to this Agreement as of the termination date of this Agreement will survive termination of this Agreement. 4. Edison will en&eer, design, and procure material and equipment for, and construct, the Edison MGS Communications Facilities as specified in Exhibit A hereto. 5. Vernon shall engineer, design and procure material and equipment for, and construct the Vernon MGS Communications Facilities in accordance with the requirements specified in Exhibit B hereto. 6. The demarcation of ownership between the Edison MGS Communications Facilities and Vernon MGS Communications Facilities shall be the communication terminal cabinet at %orris Substation as shown in Exhibit C hereto. 7. Prior to placing the Vernon MGS Communications Facilities in service, Vernon, in conjunction with Edison, shall (i) verify all points, protocols and timing locally at the RTU; (ii) correct all incorrect values and data; and (iii) perform a point-to-point, end - to -end verification of all telemetered points. 8. As specified in Sections 9 and 10 below, Vernon shall pay all of Edison's charges and expenses for the engineering, design and procurement of material and equipment for, and construction of, the Edison MGS Communications Facilities. The charges and expenses incurred pursuant to this Agreement shall include, without limitation, Edison's costs of Edison employees and contractors including related overheads. Such charges and expenses are estimated to be $54,400, as identified in Exhibit A hereto. 9. Vernon shall pay all of Vernon's charges and expenses for the engineering, design and procurement ofmaterial and equipment for, and construction of, the Vernon MGS Communications Facilities. 10. Upon the effective date of this Agreement in accordance with Section 1 above, Edison will invoice Vernon in the amount of $54,400 for Edison to perform its obligations under the teens of this Agreement (the "Estimated Charge'). Vernon shall pay to Edison the Estimated Charge within ten (10) business days of Vernon's receipt of the invoice. 11. Within twelve (12) months following the completion of the Edison MGS Communications Facilities, Edison shall determine the actual recorded Edison MGS Communications Facilities Cost, associated TTCC and associated One -Time Cost as defined in Exhibit A, and provide Vernon with a final invoice. a. If the Estimated Charge paid by Vernon pursuant to Section 10 above is less than the amount due for the Edison MGS Communications Facilities Cost, associated TTCC and associated One -Time Cost as determined from the actual recorded Edison MGS Communications Facilities Cost, associated ITCC and associated One -Time Cost, Issued by: James A. Cuillier Manager, FERC Rates & Regulation Issued on: Effective: u4i1U/2006 07:09 FAX �29 826 1498 CITY CLERK`S OFFICE 013 Southern California Edison Company Rate Schedule FERC No. )00( Original Sheet No. 3 Edison will bill Vernon for the difference between the Estimated Charge and the actual recorded costs, without interest, within twenty (20) calendar days of the date of such invoice without offset for any amount which may be in dispute. b. If the Estimated Charge is greater than the amount due for the Edison MGS Communications Facilities Cost, associated rTCC and associated One -Time Cost as determined from the actual recorded Edison MGS Communications Facilities Cost, associated rrCC anal associated One -Time Cost, Edison will refund Vernon for the difference between the Estimated Charge and the actual recorded costs, without interest, within twenty (20) calendar days of the date of such invoice without offset for any amount which maybe in dispute. e. In the event of a dispute, the parties shall promptly most and attempt to resolve the dispute. In the event the parties determine that Vernon did not owe Edison the full amount paid, then Edison shall refilnd, without interest, the amount overpaid to Vemon . within thirty (30) calendar days of such determination. 12. Edison and Vernon shall use commercially reasonable efforts to complete such work on or before four (4) weeks following receipt by Edison of the $54,400 Estimated Charge specified in Section 10 above. Edison and Vernon understand and acknowledge that such date is only an estimate and that equipment and material lead times or other unforeseen events could delay the actual completion date for such work. 13. Edison will maintain records and accounts of all costs incurred in sufficient detail to allow verification of all costs incurred, including, but not limited to, Iabor and associated labor burden, material and supplies, outside services, and administrative and general expenses. Vernon shall have the right, upon reasonable notice, at a reasonable time at Edison's offices and at its own expense, to audit Edison's records and accounts as necessary and as appropriate in order to verify costs incurred by Edison. Any audit requested by Vernon shall be limited to the costs reflected in the final invoice pursuant to Section 11 hereof, and shall be completed, and written notice of any audit dispute provided to Edison's authorized representative, within twenty-four (24) months following receipt by Vernon of such final invoice. 14. In no event shall either party be liable under any provision of this Agreement for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability. 15. Vernon shall at all times indemnify, defend and save Edison harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demands, suits, recoveries, costs and expenses, court costs, attorney fees and all other obligations by or to third parties, arising out of or resulting from Edison's performance of its obligations under this ,Agreement on behalf of Vernon, except in cases of negligence or intentional wrongdoing by Edisom issued by: James A. Cuillier Manager, FERC Rates & Regulation Issued on: Effective: 04/13/2006 07: 09 FAX 323 826 1438 CITY CLERK'S OFFICE IM 014 Southem California Edison Company Rate Schedule FERC No. XXX Original Sheet No. 4 16. Neither party will be considered in default as to any obligation under this Agreement if prevented from fiMling the obligation due to an event of Force Majeure. however, a parry whose performance under this Agreement is hindered by an event of Force Majeure shall make all reasonable efforts to perform its obligations under this Agreement. An event of Force Majeure means any act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, any curtailment, order, regulation or restriction imposed by governmental military or lawfully established civilian authorities, or any other cause beyond a parry's control. A Force Mad cure event does not include an act of negligence or intentional wrongdoing. 17. This Agreement constitutes the complete and final expression of the agreement between the parties and is intended as a complete and exclusive statement of the terms of their agreement which supersedes all prior and contemporaneous offers, promises, representations, negotiations, discussions, communications, and other agreements which may have been made in connection with the subject matter of this Agrement. 18. Any waiver at any time by either party of its rights with respect to a default under this Agreement, or with respect to any other matter arising from this Agreement, shall not be denied a waiver with respect to any subsequent default or other matter arising in conmection therewith. Any delay, with the exception of the statutory period of limitation in assessing or enfbreing any right, shall not be deemed a waiver of such right. 19. The covenants, obligations, and liabilities of the parties are intended to be several and not joint or collective, and nothing contained in this Agreement shall ever be construed to create an association, joint venture, trust or partnership, or to impose a trust or partnership covenant, obligation, or liability on or with regard to either party. Each party shall be individually responsible for its own covenants, obligations, and liabilities as provided in this Agreement. Neither party shall be under the control of the other party. Neither party shall be the agent of or have a right or power to bind the other party without such other party's express written consent. 20. The parties do not intend to create rights in, or to grant remedies to, any third party as a beneficiary either of this Agreement or of any duty, covenant, obligation, or undertaking established herein. 21. This Agreement shall be interpreted by and in accordance with the laws of the State of California, without regard to the principles of conflict of laws thereof, or the laws of the United States, as applicable, as if executed and to be performed wholly within the United states. 22_ This Agreement shall be binding upon the parties and their successors and assigns. No Ply shall assign this Agreement without the other party's prior written consent, which shall not be unreasonably withheld. Issued by: James A. Willer Manager, FERC Rates & Regulation Issued on: Effective: 04/13/2006 07;09 FAX 323 826 1438 CITY CLERK'S OFFICE 015 Southem Califomia Edison Company Rate Schedule FERC No. XXX Ortglnal Sheet No. 5 23. Edison will file this Agreene at for acceptance by the FERC. Vernon shall support acceptance of this Agreement as filed, including waiver of any necessary filing and notice requirements. Such support shall include a written statement of concurrence with such filing, if requested by Edison. 24. Ambiguities or uncertainties in the wording of this Agreement shall not be construed for or against any party, but shall be construed in the manner that most accurately reflects the parties' intent as of the date they executed this Agreement. 25. If Edison does not receive the fully executed Agroement within fifteen (15) calendar days of Vernon's receipt, then the offer reflected in this Agreement will expire and this Agreement will be of no effect. SOUTHERN CALIFORNIA EDISON COMPANY sy Ronald L. Litzinger Senior Vice President Agreed to this day of . 2006 CITY OF VERNON :5 Donal O'Callaghan Director of Light and power Issued by: James A. Cuililer Manager, FERC Rates & Regulation Issued on: Effective: Q4/13/2006 07:09 FAX 323 826 1438 CITY CLERK'S OFFICE Q016 Southern California Edison Company Rate Schedule FERC No. )= Original Sheet No. 6 EXHIBIT A, DESCRIPTION OF EDISON MGS CO104MCATIONS FACILITIES AND ESTIMATED COST Scope of Work to be Performed by Edison: • Install 4W pMS (Power Management System) circuit from the Vernon handoff at Leonis Substation to Edison's Ughthipe Regional Control Center (RCC). • Provide support and engineering resources to integrate the. Malburg Generation Station into the Edison SCADA (supervisory control and data acquisition) system. • In conjunction with Vernon personnel, verify all points, protocols and timing locally at the RTU location. • Verify the telcmetered values prior to RTU in-service date. • Terminate the communication circuit from the Edison telecom drop into the Lighthipe DAC (data acquisition controller) located in the Lighthipe computer room. Estimated Cost: Edison Communications one -Time dement lF'adlllties Costf* ITC01) Costo) Total Cost Edison MGS Commumications Facilities $40 400 $14 000 $0 $54 400 (1) Edison MGS Couurmu icatiens Facilities Cost All costs, exchxft 1TCC and One -Time Cost, deternunc by Eftau to be associated with the design, engiaeerin& procurement, construction and installation of the Edison Communications Facilities. (2) rrCC: The Income Tax Component of Contribution spedfled in the Preliminary Statement, Part M of Edison's tariff an file with the Cahfbmia Public Utilities Commission, applicable to the Edison MGS Communications Facilities Cost (3) One -Time Cost: All costs determined by Edison to be associated with the installation of the Edison MGS Communications Facilities which are not capitalized. Issued by., James A. Cuililer Manager, FERC Rates & Regulation Issued on: Effective: _04/:3/2006 07:09 FAX 323 826 1438 CITY CLERK'S OFFICE R017 Southern California Edison Company Rate Schedule FERC No. XXX Original Sheet No. 7 BXMIT B SCOPE OF WORK AND EQUIPMENT AND DATA RBQUMMIENTS FOR VERNON MGS CONMITJNICATIO14S FACI.nMS Scope of Work to be Performed by Vernon: • Install the RTU at Malburg 0oneration Station and the required communications facilities from the Malburg Generation Station to the demarcation point at the communication terminal cabinet at lr eonis Substation. • In conjunction with Edison personnel, verify all points, protocols and timing locally at the RTU prior to the RTU' being connected to Edison's SCADA system. Correct values/data prior to connecting telemetry to Edison. Analog data to be scaled one-to-one. • Perform a point -by -point end -to -end verification of all telemetered points prior to placing the equipment into service. Equipment and Data Requirements: • Typo of RTU: Qualitrol IR.8600/SR8550 or a DAQ Callisto based RTU. These models are proven on SCE's PMS. • Comm 'cation Co Lion from SCE to the RTU: A dedicated 3002 type analog circuit with the modem operating at 1200 BPS. • Protocol from SCE to R'IU(V=on): CDC 44-500 type 1. • Protocol from the RTU to the SEL 2030: Modbus. • RTU point jig and data: Edison to provide, specifying the data requirements. Vernon agrees to provide the data per the RTU point list (Le_, Unit MW, WAR, W, Unit On- Line/Off-Line Status, Unit CB status. Data to be replicated for each unit)_ • Alarm: RTU-generated communication status (composite/ health bit) will be used to alarm SCE when local telemetry data fails via local communication processors (i.e. SEL 2030). Issued by: James A. Culiiler Manager, FERC Rates & Regulation Issued on: Effective: uai.lsiLuOK 07:10 FAX 323 $26 1438 CITY CLERK'S OFFICE 0 018 Southern California Edison Company Rate Schedule FERC No. XXX Original Sheet No. 8 B)auBTT C DIAGRAM OF C01104MCATION CIRCUIT [Note: This diagram will be enlarged on tho tlnal.] Maiburg RTU to Lighthipe RCC Cammunicati m Vernon i SEA TN4U ,WkMW*SftMWIYAVRjuand Roc k--R - its Issued by: James K Cuiilier Manager, FERC Rates & Regulation Issued on: Ltglll olm Lw*0Sub Effective: SUPPORTING DOCUMENTS ' SOUTHERN CALIFORNIA EDISON® An F,DISON INTERNATIONAL® Company Mr. Donal O'Callaghan Director of Light and Power City of Vernon 4305 Santa Fe Avenue Vernon, California 90058 Robert J. Lugo Mgr., Grid Interconnection & Contract Development April 27, 2006 (S Vl Re: Letter Agreements Associated with the Malburg Generation Station Communications Facilities and the Additional 66 kV Interconnection Facilities for Execution Dear Mr. O'Callaghan: Enclosed, for execution by the City of Vernon ("Vernon"), are two originals each of the following letter agreements: (i) An engineering, design, procurement and construction letter agreement for the Vernon Malburg Generation Station communications facilities required for Edison to remotely monitor the station ("Malburg Letter Agreement"). (ii) An engineering, design, procurement and construction letter agreement for an additional 66 kV point of interconnection to serve a new Vernon substation ("66kV Letter Agreement"). (iii) A letter agreement to amend the Laguna Bell -Vernon Interconnection Service Agreement ("Laguna Bell Letter Agreement") to include the provisions for the parties to own, operate and maintain the facilities associated with Items (i) and (ii) above. "Clean" and redline versions of the amended Laguna Bell -Vernon Interconnection Service Agreement are attached to the Laguna Bell Letter Agreement. The Malburg Letter Agreement provides the terms and conditions for Southern California Edison Company ("Edison") and Vernon to engineer, design, and procure material and equipment for, and construct, the required communications facilities on their respective properties (the "Edison MGS Communications Facilities" and "Vernon MGS Communications Facilities"). The estimated cost of the Edison MGS Communications Facilities is $54,540. Such amount will be due within ten (10) business days after Edison tenders the invoice to Vernon after the effective date of the Malburg Letter Agreement. The estimated completion date of such facilities is four weeks after receipt of the payment. The 66kV Letter Agreement provides the terms and conditions for Edison to engineer, design, and procure material and equipment for, and construct, the facilities required to accommodate an additional point of interconnection via the tapping of the existing Laguna Bell — Leonis No. 1 66 kV line (the "Additional Interconnection Project Facilities"). The estimated cost of the Additional Interconnection Project Facilities is $238,842.50. Such amount is due to Edison upon execution of the 66kV Letter Agreement. The parties are targeting an August 1, 2006 in-service date for the facilities. P.O. sox 800 2244 Walnut Grove Ave. Rosemead, CA 91770 626-302-8501/PAX 28501 Fax 626-302-1152 robert.lugo@sce.com Mr. Donal O'Callaghan April 27, 2006 Page 2 of 2 The Laguna Bell Letter Agreement authorizes the parties to amend the Laguna Bell -Vernon Interconnection Service Agreement C Amended ISA") to include the following provisions: (i) Edison to own, operate and maintain the Edison MGS Communications Facilities and the Additional Interconnection Project Facilities, and (ii) Vernon to own, operate and maintain the Vernon MGS Communications Facilities. Vernon will pay the Edison MGS Communications Facilities Charge and the Additional Interconnection Project Facilities Charge each month, estimated to be $137.36 and $552.67, respectively, for the ongoing O&M costs, A&G expenses, and Franchise Taxes. Please arrange to have the two sets of originals signed and dated, and return one original set of the three letter agreements to me along with the $238,842.50 payment for the Additional Interconnection Project Facilities by May 5, 2006. Upon receipt of the executed letter agreements, Edison will make the necessary filings with FERC. If you have any questions regarding this letter, please contact Ms. Teri Kondo at (626) 302-8703. Sincerely, 1,4� 71"eelr i6n Robert J. Lugo enclosures Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 1 April 26, 2006 Mr. Bruce Malkenhorst Capital Project Administrator Light and Power Department City of Vernon 4305 Santa Fe Avenue Vernon, California 90058 Re: EWjneering, Design, Procurement and Construction Letter Agreement for Malburg Generation Station Communications Facilities Dear Mr. Malkenhorst: On October 17, 2005, the City of Vernon ("Vernon") commenced operation of its 134 MW Malburg Generation Station ("MGS") located within Vernon's city limits and interconnected to its 66 kV system (the "Project'). Southern California Edison Company ("Edison") has determined that it needs to remotely monitor Vernon's MGS by providing real-time data to Edison's Grid Control Center. Until the required remote terminal unit ("RTU") and associated communications equipment have been placed in service, Edison and Vernon have agreed that Vernon will provide the necessary data to Edison pursuant to Edison's manual operating procedures. The Laguna Bell -Vernon Interconnection Service Agreement between Edison and Vernon (the "ISA') sets forth the parties' respective rights and obligations to provide necessary communications facilities such as the RTU. The ISA will be amended concurrently with the execution of this letter agreement ("Agreement") to include the terms for (i) Edison to own, operate and maintain the facilities specified in Exhibit A hereto required for the Project (the "Edison MGS Communications Facilities") and (ii) Vernon to awn, operate and maintain the facilities specified in Exhibit B hereto required for the Project (the "Vernon MGS Communications Facilities"). The purpose of this Agreement is to agree upon an arrangement pursuant to which (i) Edison will engineer, design, and procure material and equipment for, and construct, the Edison MGS Communications Facilities, and (ii) Vernon shall engineer, design, procure and construct the Vernon MGS Communications Facilities, as described herein. 1. This Agreement shall become effective on the effective date ordered by the Federal Energy Regulatory Committee ("FERC"). 2. Subject to Section 3 below, this Agreement shall terminate upon the earlier of the following to occur: (i) notice that this Agreement is not accepted for filing by FERC, or (ii) completion of the audit period specified in Section 13 below. Issued by: James A. Cuillier Manager, FERC Rates & Regulation Issued on: Effective: Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 2 3. Vernon's obligations to pay charges and expenses incurred or irrevocably committed to be incurred pursuant to this Agreement as of the termination date of this Agreement will survive termination of this Agreement. 4. Edison will engineer, design, and procure material and equipment for, and construct, the Edison MGS Communications Facilities as specified in Exhibit A hereto. 5. Vernon shall engineer, design and procure material and equipment for, and construct the Vernon MGS Communications Facilities in accordance with the requirements specified in Exhibit B hereto. 6. The demarcation of ownership between the Edison MGS Communications Facilities and Vernon MGS Communications Facilities shall be the communication terminal cabinet at Leonis Substation as shown in Exhibit C hereto. 7. Prior to placing the Vernon MGS Communications Facilities in service, Vernon, in conjunction with Edison, shall (i) verify all points, protocols and timing locally at the RTU; (ii) correct all incorrect values and data; and (iii) perform a point-to-point, end - to -end verification of all telemetered points. 8. As specified in Sections 9 and 10 below, Vernon shall pay all of Edison's charges and expenses for the engineering, design and procurement of material and equipment for, and construction of, the Edison MGS Communications Facilities. The charges and expenses incurred pursuant to this Agreement shall include, without limitation, Edison's costs of Edison employees and contractors including related overheads. Such charges and expenses are estimated to be $54,540, as identified in Exhibit A hereto. 9. Vernon shall pay all of Vernon's charges and expenses for the engineering, design and procurement of material and equipment for, and construction of, the Vernon MGS Communications Facilities. 10. Upon the effective date of this Agreement in accordance with Section 1 above, Edison will invoice Vernon in the amount of $54,540 for Edison to perform its obligations under the terms of this Agreement (the "Estimated Charge"). Vernon shall pay to Edison the Estimated Charge within ten (10) business days of Vernon's receipt of the invoice. 11. Within twelve (12) months following the completion of the Edison MGS Communications Facilities, Edison shall determine the actual recorded Edison MGS Communications Facilities Cost, associated ITCC and associated One -Time Cost as defined in Exhibit A, and provide Vernon with a final invoice. a. If the Estimated Charge paid by Vernon pursuant to Section 10 above is less than the amount due for the Edison MGS Communications Facilities Cost, associated ITCC and associated One -Time Cost as determined from the actual recorded Edison MGS Communications Facilities Cost, associated ITCC and associated One -Time Cost, Issued by: James A. Cuilfier Manager, FERC Rates & Regulation Issued on: Effective: Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 3 Edison will bill Vernon for the difference between the Estimated Charge and the actual recorded costs, without interest, within twenty (20) calendar days of the date of such invoice without offset for any amount which may be in dispute. b. If the Estimated Charge is greater than the amount due for the Edison MGS Communications Facilities Cost, associated ITCC and associated One -Time Cost as determined from the actual recorded Edison MGS Communications Facilities Cost, associated ITCC and associated One -Time Cost, Edison will refund Vernon for the difference between the Estimated Charge and the actual recorded costs, without interest, within twenty (20) calendar days of the date of such invoice without offset for any amount which may be in dispute. c. In the event of a dispute, the parties shall promptly meet and attempt to resolve the dispute. In the event the parties determine that Vernon did not owe Edison the full amount paid, then Edison shall refund, without interest, the amount overpaid to Vernon within thirty (30) calendar days of such determination. 12. Edison and Vernon shall use commercially reasonable efforts to complete such work on or before four (4) weeks following receipt by Edison of the $54,540 Estimated Charge specified in Section 10 above. Edison and Vernon understand and acknowledge that such date is only an estimate and that equipment and material lead times or other unforeseen events could delay the actual completion date for such work. 13. Edison will maintain records and accounts of all costs incurred in sufficient detail to allow verification of all costs incurred, including, but not limited to, labor and associated labor burden, material and supplies, outside services, and administrative and general expenses. Vernon shall have the right, upon reasonable notice, at a reasonable time at Edison's offices and at its own expense, to audit Edison's records and accounts as necessary and as appropriate in order to verify costs incurred by Edison. Any audit requested by Vernon shall be limited to the costs reflected in the final invoice pursuant to Section 11 hereof, and shall be completed, and written notice of any audit dispute provided to Edison's authorized representative, within twenty-four (24) months following receipt by Vernon of such final invoice. 14.. In no event shall either party be liable under any provision of this Agreement for any losses, damages, costs or expenses for any special, indirect, incidental, consequential, or punitive damages, whether based in whole or in part in contract, in tort, including negligence, strict liability, or any other theory of liability. 15. Vernon shall at all times indemnify, defend and save Edison harmless from, any and all damages, losses, claims, including claims and actions relating to injury to or death of any person or damage to property, demands, suits, recoveries, costs and expenses, court costs, attorney fees and all other obligations by or to third parties, arising out of or resulting from Edison's performance of its obligations under this Agreement on behalf of Vernon, except in cases of negligence or intentional wrongdoing by Edison. Issued by: James A. Cuillier Manager, FERC Rates & Regulation Issued on: Effective: Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 4 16. Neither party will be considered in default as to any obligation under this Agreement if prevented from fulfilling the obligation due to an event of Force Majeure. However, a party whose performance under this Agreement is hindered by an event of Force Majeure shall make all reasonable efforts to perform its obligations under this Agreement. An event of Force Majeure means any act of God, labor disturbance, act of the public enemy, war, insurrection, riot, fire, storm or flood, explosion, breakage or accident to machinery or equipment, any curtailment, order, regulation or restriction imposed by governmental military or lawfully established civilian authorities, or any other cause beyond a parry's control. A Force Majeure event does not include an act of negligence or intentional wrongdoing. 17. This Agreement and the ISA constitute the complete and final expression of the agreement between the parties and is intended as a complete and exclusive statement of the terms of their agreement which supersedes all prior and contemporaneous offers, promises, representations, negotiations, discussions, communications, and other agreements which may have been made in connection with the subject matter of this Agreement. 18. Any waiver at any time by either party of its rights with respect to a default under this Agreement, or with respect to any other matter arising from this Agreement, shall not be deemed a waiver with respect to any subsequent default or other matter arising in connection therewith. Any delay, with the exception of the statutory period of limitation in assessing or enforcing any right, shall not be deemed a waiver of such right. 19. The covenants, obligations, and liabilities of the parties are intended to be several and not joint or collective, and nothing contained in this Agreement shall ever be construed to create an association, joint venture, trust or partnership, or to impose a trust or partnership covenant, obligation, or liability on or with regard to either party. Each party shall be individually responsible for its own covenants, obligations, and liabilities as provided in this Agreement. Neither party shall be under the control of the other party. Neither party shall be the agent of or have a right or power to bind the other party without such other parry's express written consent. 20. - The parties do not intend to create rights in, or to grant remedies to, any third party as a beneficiary either of this Agreement or of any duty, covenant, obligation, or undertaking established herein. 21. This Agreement shall be interpreted by and in accordance with the laws of the State of California, without regard to the principles of conflict of laws thereof, or the laws of the United States, as applicable, as if executed and to be performed wholly within the United States. Issued by: James A. Cuillier Manager, FERC Rates & Regutation Issued on: Effective: Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 5 22. This Agreement shall be binding upon the parties and their successors and assigns. No party shall assign this Agreement without the other party's prior written consent, which shall not be unreasonably withheld. 23. Edison will file this Agreement for acceptance by the FERC. Vernon shall support acceptance of this Agreement as filed, including waiver of any necessary filing and notice requirements. Such support shall include a written statement of concurrence with such filing, if requested by Edison. 24. Ambiguities or uncertainties in the wording of this Agreement shall not be construed for or against any party, but shall be construed in the manner that most accurately reflects the parties' intent as of the date they executed this Agreement. 25. If Edison does not receive the fully executed Agreement within seven (7) calendar days of Vernon's receipt, then the offer reflected in this Agreement will expire and this Agreement will be of no effect. APPROVED STEPHEN E. PICKETT Sr. Vice President and General Counsel By _ Attorney , 2011,G._ SOUTHERN CALIFORNIA EDISON COMPANY By �r Ronald L. Litzinger Senior Vice President Agreed to this O' d day of 2006 CITY OF VERNON By Bruce Malkenhkoh Capital Project Administrator APPROVED AS TO FORM: Eric T. Fresch, City Atto Issued by: James A. Cuillier . Manager, FERC Rates & Regulation Issued on: Effective: Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 6 EXHIBIT A DESCRIPTION OF EDISON MGS COMMUNICATIONS FACILITIES AND ESTIMATED COST Scope of Work to be Performed by Edison: • Install 4W PMS (Power Management System) circuit from the Vernon handoff at Leonis Substation to Edison's Lighthipe Regional Coptrol Center (RCC). • Provide support and engineering resources to integrate the Malburg Generation Station into the Edison SCADA (supervisory control and data acquisition) system. • In conjunction with Vernon personnel, verify all points, protocols and timing locally at the RTU location. • Verify the telemetered values prior to RTU in-service date. • Terminate the communication circuit from the Edison telecom drop into the Lighthipe DAC (data acquisition controller) located in the Lighthipe computer room. Estimated Cost: Edison Communications One -Time Element Facilities Cosy) ITCCM Cost0) Total Cost Edison MGS Communications Facilities $40,400 $14,140 $0 $54,540 (1) Edison MGS Communications Facilities Cost: All costs, excluding ITCC and One -Time Cost, determine by Edison to be associated with the design, engineering, procurement, construction and installation of the Edison Communications Facilities. (2) ITCC: The Income Tax Component of Contribution specified in the Preliminary Statement, Part M of Edison's tariff on file with the California Public Utilities Commission, applicable to the Edison MGS Communications Facilities Cost. (3) One -Time Cost: All costs determined by Edison to be associated with the installation of the Edison MGS Communications Facilities which are not capitalized. Issued by: James A. Cuiilier Manager, FERC Rates & Regulation Issued on: Effective: Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 7 EXHIBIT B SCOPE OF WORK AND EQUIPMENT AND DATA REQUIREMENTS FOR VERNON MGS COMMUNICATIONS FACILITIES Scope of Work to be Performed by Vernon: • Install the RTU at Malburg Generation Station and the required communications facilities from the Malburg Generation Station to the demarcation point at the communication terminal cabinet at Leonis Substation. • In conjunction with Edison personnel, verify all points, protocols and timing locally at the RTU prior to the RTU being connected to Edison's SCADA system. Correct values/data prior to connecting telemetry to Edison. Analog data to be scaled one-to-one. • Perform a point -by -point end -to -end verification of all telemetered points prior to placing the equipment into service. Equipment and Data Requirements: • Type of RTU: Qualitrol IR8600/SR8550 or a DAQ Callisto based RTU. These models are proven on Edison's PMS. • Communication Connection from Edison to the RTU: A dedicated 3002 type analog circuit with the modern operating at 1200 BPS. • Protocol from Edison to RTU(Yernon): CDC 44-500 type 1. • Protocol from the RTU to the SEL 2030: Modbus. • RTU point list and data: Edison to provide, specifying the data requirements. Vernon agrees to provide the data per the RTU point list (i.e., Unit MW, MVAR, kV, Unit On- Line/Off-Line Status, Unit CB status. Data to be replicated for each unit). • Alarm: RTU-generated communication status (composite/ health bit) will be used to alarm Edison when local telemetry data fails via local communication processors (i.e. SEL 2030). Issued by: James A. Cuillier Manager, FERC Rates & Regulation Issued on: Effective: Southern California Edison Company Rate Schedule FERC No. 473 Original Sheet No. 8 11 EXHIBIT C DIAGRAM OF COMMUNICATION CIRCUIT 0 Malburg RTU to Lighthipe RCC Communications 30=0M8C8 Malburg GS Vernon Sub I elm QM comad Caa�sd `I Leonij Bandini Sub Sub Vernon I SCE Note: The actual tone levels at the Malburg RTU and Lighthipe RCC are -8 dBm Tx, -8 dBm Rx RCC 0" Bak Lighthipe RCC TSank Cmard '.0 Laguna Bell Sub S� F Issued by: James A. Cuillier Manager, FERC Rates & Regulation Issued on: Effective: DACE Lighthipe Sub