Resolution No. 92421 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 9242 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 BY AND BETWEEN THE CITY OF VERNON AND VCI TELCOM, INC. RELATING TO THE FIBER OPTIC PROGRAM WHEREAS, on July 2, 2003, the City Council of the City of Vernon adopted Resolution No. 8237 approving and authorizing the execution of Contract No. FO 2003, Fiber Optic Network Extension -City Facilities -Phase V, dated July 2, 2003 (the "Contract") with VCI Telcom, Inc. ("VCI") for optical fiber cable background construction, remote facilities connections and construction of fiber optic network extensions into interested business facilities within the City of Vernon; and WHEREAS, Schedule D of the Contract, Optional Task Pricing Form, provides a budget of not to exceed $100,000.00 for the fiber optic network extension work provided by VCI; and WHEREAS, under the Contract which was signed over three years ago, a number of buildings in the City have been connected to the fiber optic network and the funds allocated for the task are depleted; and WHEREAS, the City of Vernon and VCI desire to amend Schedule D of the Contract to establish a new budget of $150,000.00 for the fiber optic network for City's use and Vernon business building connections to internet services and to identify certain tasks that were previously covered under miscellaneous items under the same terms and conditions of the existing Contract; and WHEREAS, the Director of Light & Power has recommended that 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 an amendment to the Contract with VCI be approved. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE: CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon hereby approves the Amendment No. One to Contract No. FO 2003 with VCI, in substantially the same form as the copy which is attached hereto as Exhibit A and incorporated by reference. SECTION 3: The City Council of the City of Vernon hereby authorizes the Mayor to execute said Amendment for, and on behalf of, the City of Vernon and the Acting City Clerk is hereby authorized to attest thereto. SECTION 4: The City Council of the City of Vernon hereby authorizes the Acting City Administrator, or his designee, to make whatever nonsubstantive, administrative and/or text changes, upon advice of counsel, to the Amendment. SECTION 5: The City Council of the City of Vernon hereby directs the Acting City Clerk, or his designee, to send one fully executed Amendment to: VCI Telcom, Inc. Attn: John Xanthos, President 1921 W. llth Street Upland, CA 91786 - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 6: The Acting City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 20th day of February, 2007. ATTEST: NUELA GIR N Acting City Clerk HILARIO GONZAL S, Mayor Pro-Tem - 3 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, MANUELA GIRON, Acting City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 9242, was duly adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Tuesday, February 20, 2007, and thereafter was duly signed by the Mayor Pro-Tem of the City of Vernon. ANUELA GIR N Acting City Clerk (SEAL) - 4 - EXHIBIT VA& 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 THIS AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this 2OTH day of February, 2007 BY AND BETWEEN THE CITY OF VERNON, a municipal corporation (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, California 90058 AND VCI TELCOM, INC., a subsidiary of Quanta Services, Inc. (hereinafter referred to as "VCI Telcom") 1921 W. llth Street Upland, CA 91786 RECITALS WHEREAS, the City and VCI Telcom are parties to Contract No. FO 2003, Fiber Optic Network Extension -City Facilities -Phase V, dated July 2, 2003 (hereinafter referred to as the "Contract") under which VCI Telcom was to perform optical fiber cable background construction, remote facilities connections and construction of fiber optic network extensions into interested business facilities in the City; and WHEREAS, Schedule D of the Contract, Optional Task Pricing Form, provides a budget of not to exceed $100,000.00 for the fiber optic network extension work; and WHEREAS, over the past three years, a number of buildings have been connected to the fiber optic network under Schedule D of the Contract and the funds allocated for this task are now depleted; and WHEREAS, VCI Telcom notified the City on February 14, 2007 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 that it was willing to continue providing the fiber optic network extension services under the same terms and conditions of the existing Contract; and WHEREAS, the City and VCI Telcom desire to amend Schedule D of the Contract to better identify certain tasks that were previously covered under miscellaneous items in order to expedite the invoicing process and to provide for a new budget amount of not to exceed One Hundred Fifty Thousand Dollars and No Cents ($150,000.00); and WHEREAS, VCI Telcom shall continue to provide the fiber optic network extension services under the same terms and conditions of the existing Contract. NOW, THEREFORE, IN CONSIDERATION OF THESE MUTUAL COVENANTS, THE PARTIES HERETO AGREE AS FOLLOWS: SECTION 1: Schedule D of Contract No. FO 2003, Optional Task Pricing Form, is hereby amended to provide a new budget of not to exceed $150,000.00 for the fiber optic network extension work and to clarify tasks previously covered under miscellaneous items in accordance with the amended Schedule D of the Contract which is attached hereto as Exhibit A and incorporated by reference under the same terms and conditions of the Contract. SECTION 2: In all other respects, the terms and conditions of the Contract shall be renewed in its entirety. - 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, City and VCI Telcom have executed this Amendment as of the date first hereinabove set forth. CITY OF VERNON By: HILARIO GONZALES, Mayor Pro-Tem ATTEST: MANUELA GIRON, Acting City Clerk APPROVED AS TO FORM: JEFF HARRISON, Acting City Attorney VCI TELCOM, INC. (which will do business in California as Delaware VCI Telcom, Inc.) By: Print Name: Title: By: Print Name: Title: - 3 - EXHIBIT A SCHEDULE D CITY OF VERNON FIBER OPTIC NETWORK EXTENSION PHASE V - CONTRACT FO 2003 OPTIONAL TASK - BUSINESS EXTENSIONS Purchase Order No. S0420 CONTRACT Contract Item SCHEDULE ,ription A. 1 Stand and Hardware 2 Aerial Reber Placement 3 Overlash to Existing Plant 4 Delash and Relash 5 Down Guy to Existing Anchor Placement 6 Guard Arm Placement 7 Cable Arm Placement 8 5' Extension Arm Placement 9 8'-10' Extension Arm Placement 10 Aerial slack loon w/Snow shoes 11 Aerial splice Enclosure slack loop 12 Lower/Raise existing slack loo9p 13 Lower/Rasie existing Splice Enclosure 14 Rearrangement/Cable Move 15 Cable Marking w/City I.D. Information 16 Bonding 17 Dirt Anchor Placement 18 Concrete Anchor Placement 19 Miscellaneous Work (Itemize Separately and Show total price 20 Traffic Control Includes arrowboard/safety 21 OT 1 1/2 Rate Per Man Hour Standby time for Building entrances (Crew Rate to be used per 22 application) 23 Pole to building -Self support slack span with stand 24 Building attachment 25 Fiber ran inside building 26 Service drop placement 27 Building Entrance Penitration 28 Place up two 3-1 1/4" innerducts <500' 29 Place up two 3-1 1/4" innerducts >500' 30 Fiber fusion splicing test and document (up to 6 fibers) 31 Fiber fusion splicing test and document (6 to 12 fibers) 32 Fiber fusion splicing -Document and test (12 to 36 fibers) 33 Fiber fusion splicing test and document ( over 36 fibers) 34 2 man hourly crew rate with equipment 35 3 Man Hourly Crew rate with equipment 36 4 Man hourly crew rate with equipment 37 Ring Cut/Mid Entry 38 Prep New Splicing Enclosure 39 Prep/Install 12 port rack mount Patch Panel 40 Terminate 12 Fibers in the new P.P. 41 Splices at the Splice Enclosure 42 Miscellaneous Work (Itemize Separately and Show total price) 43 Re -Entry existing Enclosure (each) Unit Production Price price Amount Extension $ 0.67 $ - $ 0.67 $ - $ 0.75 $ - $ 0.90 $ - $ 46.00 $ - $ 50.00 $ - $ 110.00 $ - $ 135.00 $ - $ 260.00 $ - $ 155.00 $ - $ 220.00 $ - $ 112.00 $ - $ 112.00 $ - $ 25.00 $ - $ 2.00 $ - $ 25.00 $ - $ 385.00 $ - $ 485.00 $ - TBD $ 80.00 $ - $ 23.40 $ - TBD $ 3.00 $ - $ 35.00 $ - $ 3.50 $ - $ 2.65 $ - $ 65.00 $ - $ 1.90 $ - $ 1.45 $ - $ 45.00 $ - $ 40.00 $ - $ 35.00 $ - $ 32.00 $ - $ 141.00 $ - $ 184.00 $ - $ 219.00 $ - $ 125.00 $ - $ 200.00 $ - $ 100.00 $ - $ 150.00 $ - $ 40.00 $ - TBD 125.00 $ - SUPPORTING DOCUMENTS 4305 Santa Fe Avenue, Vernon, California 90058 Telephone (323) 583-8811 March 19, 2007 VCI Telcom, Inc. Attn: John Xanthos, President 1921 W. 11th Street Upland, CA 91786 Re: Amendment No. One to Contract No. FO 2003 Dear Mr. Xanthos: The insurance requirements have been met. Transmitted herewith is a fully executed amendment as referenced above, approved by City Council on February 20, 2007, through Resolution No. 9242. If you have any questions regarding this matter, please call Mr. Ali Nour, at (323) 583-8811 ext. 316. Very truly yours, Nelly Giron Acting City Clerk F�Cewra c: Donal O'Callaghan Ali Nour Dolores Jaunzemis Resolution No. 9242 Agreement File No. 07-016 1 2 3 4 5 6 71 8� 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 9242 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND AUTHORIZING THE EXECUTION OF AN AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 BY AND BETWEEN THE CITY OF VERNON AND VCI TELCOM, INC. RELATING TO THE FIBER OPTIC PROGRAM WHEREAS, on July 2, 2003, the City Council of the City of Vernon adopted Resolution No. 8237 approving and authorizing the execution of Contract No. FO 2003, Fiber Optic Network Extension -City Facilities -Phase V, dated July 2, 2003 (the "Contract") with VCI Telcom, Inc. ("VCI") for optical fiber cable background construction, remote facilities connections and construction of fiber optic network extensions into interested business facilities within the City of (Vernon; and WHEREAS, Schedule D of the Contract, Optional Task Pricing (Form, provides a budget of not to exceed $100,000.00 for the fiber (optic network extension work provided by VCI; and WHEREAS, under the Contract which was signed over three years ago, a number of buildings.in the City have been connected to Ithe fiber optic network and the funds allocated for the task are depleted; and WHEREAS, the City of Vernon and VCI desire to amend Schedule ID of the Contract to establish a new budget of $150,000.00 for the Ifiber optic network for City's use and Vernon business building connections to internet services and to identify certain tasks that were previously covered under miscellaneous items under the same terms land conditions of the existing Contract; and WHEREAS, the Director of Light & Power has recommended that 1 an amendment to the Contract with VCI be approved. 2 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE: 3 CITY OF VERNON AS FOLLOWS: 4 SECTION 1: The City Council of the City of Vernon hereby 5 finds and determines that the recitals contained hereinabove are true 6 and correct. 7 SECTION 2: The City Council of the City of Vernon hereby 8 approves the Amendment No. One to Contract No. FO 2003 with VCI, in 9 substantially the same form as the copy which is attached hereto as 10 Exhibit A and incorporated by reference. 11 SECTION 3: The City Council of the City of Vernon hereby 12 authorizes the Mayor to execute said Amendment for, and on behalf of, 13 the City of Vernon and the Acting City Clerk is hereby authorized to 14 attest thereto. 15 SECTION 4: The City Council of the City of Vernon hereby 16 authorizes the Acting City Administrator, or his designee, to make 17 whatever nonsubstantive, administrative and/or text changes, upon 18 advice of counsel, to the Amendment. 19 SECTION 5: The City Council of the City of Vernon hereby 20 directs the Acting City Clerk, or his designee, to send one fully 21 executed Amendment to: 22 VCI Telcom, Inc. Attn: John Xanthos, President 23 1921 W. llth Street 24 Upland, CA 91786 25 26 ! ! ! 27 28 2 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 SECTION 6: The Acting City Clerk of the City of Vernon shall certify to the passage of this resolution, and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 20th day of February, 2007. ATTEST: ANUELA GIRION Acting City Clerk HILARIO GONZAL S, Mayor Pro-Tem - 3 - 1 STATE OF CALIFORNIA ) ss 2 COUNTY OF LOS ANGELES ) 3 4 I, MANUELA GIRON, Acting City Clerk of the City of Vernon, do 5 hereby certify that the foregoing Resolution, being Resolution No. 6 9242, was duly adopted by the City Council of the City of Vernon at a 7 regular meeting of the City Council duly held on Tuesday, February 20, 8 2007, and thereafter was duly signed by the Mayor Pro-Tem of the City 9 of Vernon. 10 11 ANUELA GIR N 12 Acting City Clerk 13 (SEAL) 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 4 _ Foll '642 11 10, 1 2 3 4 5 6 7 8 X, 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 THIS AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this 20TH day of February, 2007 IBY AND BETWEEN THE CITY OF VERNON, a municipal corporation (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, California 90058 VCI TELCOM, INC., a subsidiary of Quanta Services, Inc. (hereinafter referred to as 'VCI Telcom") 1921 W. llth Street Upland, CA 91786 - - r WHEREAS, the City and VCI Telcom are parties to Contract No. FO 2003, Fiber Optic Network Extension -City Facilities -Phase V, dated July 2, 2003 (hereinafter referred to as the "Contract") under which VCI Telcom was to perform optical fiber cable background construction, remote facilities connections and construction of fiber optic network extensions into interested business facilities in the City; and WHEREAS, Schedule D of the Contract, Optional Task Pricing Form, provides a budget of not to exceed $100,000.00 for the fiber optic network extension work; and WHEREAS, over the past three years, a number of buildings have been connected to the fiber optic network under Schedule D of the Contract and the funds allocated for this task are now depleted; and WHEREAS, VCI Telcom notified the City on February 14, 2007 1 that it was willing to continue providing the fiber optic network 2 extension services under the same terms and conditions of the existing 3 Contract; and 4 WHEREAS, the City and VCI Telcom desire to amend Schedule D 5 of the Contract to better identify certain tasks that were previously 6 covered under miscellaneous items in order to expedite the invoicing 7 process and to provide for a new budget amount of not to exceed One 8 Hundred Fifty Thousand Dollars and No Cents ($150,000.00); and 9 WHEREAS, VCI Telcom shall continue to provide the fiber optic 10 network extension services under the same terms and conditions of the 11 existing Contract. 12 NOW, THEREFORE, IN CONSIDERATION OF THESE MUTUAL COVENANTS, 13 THE PARTIES HERETO AGREE AS FOLLOWS: 14 SECTION 1: Schedule D of Contract No. FO 2003, Optional 15 Task Pricing Form, is hereby amended to provide a new budget of not to 16 exceed $150,000.00 for the fiber optic network extension work and to 17 clarify tasks previously covered under miscellaneous items in 18 accordance with the amended Schedule D of the Contract which is 19 attached hereto as Exhibit A and incorporated by reference under the 20 same terms and conditions of the Contract. 21 SECTION 2: In all other respects, the terms and conditions 22 of the Contract shall be renewed in its entirety. 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 i 27 28 IN WITNESS WHEREOF, City and VCI Telcom have executed this Amendment as of the date first hereinabove set forth. CITY OF VERNON By: HILARIO GONZALES, Mayor Pro -Tern FATTEST: MANUELA GIRON, Acting City Clerk APPROVED AS TO FORM: JEFF HARRISON, Acting City Attorney VCI TELCOM, INC. (which will do business in California as Delaware VCI Telcom, Inc.) By: Print Name: Title: By: Print Name: Title: - 3 - EXHIBIT A SCHEDULE D CITY OF VERNON FIBER OPTIC NETWORK EXTENSION PHASE V - CONTRACT FO 2003 OPTIONAL TASK - BUSINESS EXTENSIONS Purchase Order No. SO420 CONTRACT Contract Item SCHEDULE Description A. 1 Stand and Hardware 2 Aerial Fieber Placement 3_ Overlash to Existing Plant 4 Delash and Relash 5 Down Guy to Existing Anchor Placement 6 Guard Arm Placement 7 Cable Arm Placement 8 5' Extension Arm Placement 9 8'-10' Extension Arm Placement 10 Aerial slack loop w/Snow shoes 11 Aerial splice Enclosure slack loop 12 Lower/Raise existing slack loo92 13 Lower/Rasie existing Splice Enclosure 14 Rearrangement/Cable Move 15 Cable Marking w/City I.D. Information 16 Bonding 17 Dirt Anchor Placement 18 Concrete Anchor Placement 19 Miscellaneous Work (Itemize Separately and Show total price 20 Traffic Control Includes arrowboard/safety 21 OT 1 12 Rate Per Man Hour Standby time for Building entrances (Crew Rate to be used per 22 application) 23 Pole to building -Self support slack span with stand 24 Building attachment 25 Fiber ran inside building 26 Service drop placement 27 Building Entrance Penitration 28 Place up two 3-1 1/4" innerducts <500' 29 Place up two 3-1 1/4" innerducts >500' 30 Fiber fusion splicing test and document (up to 6 fibers) 31 Fiber fusion splicing -test and document (6 to 12 fibers) 32 Fiber fusion splicing -Document and test (12 to 36 fibers) 33 Fiber fusion -splicing -test and document ( over 36 fibers) 34 2 man hourly crew rate with equipment 35 3 Man Hourly Crew rate with equipment 36 4 Man hourly crew rate with equipment 37 Ring Cut/Mid Entry 38 Prep New Splicing Enclosure 39 Prep/install 12 port rack mount Patch Panel 40 Terminate 12 Fibers in the new P.P. 41 Splices at the Splice Enclosure 42 Miscellaneous Work (itemize Separately and Show total price) 43 Re -Entry existing Enclosure (each) Unit Price Production Price Amount Extension $ 0.67 $ - $ 0.67 $ - $ 0.75 $ - $ 0.90 $ - $ 46.00 $ - $ 50.00 $ - $ 110.00 $ - $ 135.00 $ - $ 260.00 $ - $ 155.00 $ - $ 220.00 $ - $ 112.00 $ - $ 112.00 $ - $ 25.00 $ - $ 2.00 $ - $ 25.00 $ - $ 385.00 $ - $ 485.00 $ - TBD $ 80.00 $ - $ 23.40 $ - TBD $ 3.00 $ - $ 35.00 $ - $ 3.50 $ $ 2.65 $ $ 65.00 $ - $ 1.90 $ - $ 1.45 $ - $ 45.00 $ - $ 40.00 $ - $ 35.00 $ - $ 32.00 $ - $ 141.00 $ - $ 184.00 $ - $ 219.00 $ - $ 125.00 $ $ 200.00 $ $ 100.00 $ - $ 150.00 $ - $ 40.00 $ - TBD $ 125.00 $ - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 THIS AMENDMENT NO. ONE TO CONTRACT NO. FO 2003 is made, entered into and executed in duplicate originals, either copy of which may be considered and used as the original hereof for all purposes, as of this 20TH day of February, 2007 (BY AND BETWEEN mI THE CITY OF VERNON, a municipal corporation (hereinafter referred to as the "City") 4305 Santa Fe Avenue Vernon, California 90058 VCI TELCOM, INC., a subsidiary of Quanta Services, Inc. (hereinafter referred to as "VCI Telcom") 1921 W. llth Street Upland, CA 91786 RECITALS WHEREAS, the City and VCI Telcom are parties to Contract No. FO 2003, Fiber Optic Network Extension -City Facilities -Phase V, dated July 2, 2003 (hereinafter referred to as the "Contract") under which VCI Telcom was to perform optical fiber cable background construction, remote facilities connections and construction of fiber optic network extensions into interested business facilities in the City; and WHEREAS, Schedule D of the Contract, Optional Task Pricing Form, provides a budget of not to exceed $100,000.00 for the fiber optic network extension work; and WHEREAS, over the past three years, a number of buildings have been connected to the fiber optic network under Schedule D of the Contract and the funds allocated for this task are now depleted; and 28 11 WHEREAS, VCI Telcom notified the City on February 14, 2007 1 that it was willing to continue providing the fiber optic network 2 extension services under the same terms and conditions of the existing 3 Contract; and 4 WHEREAS, the City and VCI Telcom desire to amend Schedule D 5 of the Contract to better identify certain tasks that were previously 6 covered under miscellaneous items in order to expedite the invoicing 7 process and to provide for a new budget amount of not to exceed One 8 Hundred Fifty Thousand Dollars and No Cents ($150,000.00); and 9 WHEREAS, VCI Telcom shall continue to provide the fiber optic 10 network extension services under the same terms and conditions of the 11 existing Contract. 12 NOW, THEREFORE, IN CONSIDERATION OF THESE MUTUAL COVENANTS, 13 THE PARTIES HERETO AGREE AS FOLLOWS: 14 SECTION 1: Schedule D of Contract No. FO 2003, Optional 15 Task Pricing Form, is hereby amended to provide a new budget of not to 16 exceed $150,000.00 for the fiber optic network extension work and to 17 clarify tasks previously covered under miscellaneous items in 18 accordance with the amended Schedule D of the Contract which is 19 attached hereto as Exhibit A and incorporated by reference under the 20 same terms and conditions of the Contract. 21 SECTION 2: In all other respects, the terms and conditions 22 of the Contract shall be renewed in its entirety. 23 24 25 26 27 28 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 IN WITNESS WHEREOF, City and VCI Telcom have executed this IlAmendment as of the date first hereinabove set forth. CITY OF VERNON By: HILARIO GONZALES, Mayor Pro-Tem TTEST: N ELA GIR , Acting City Clerk APPROVED- S TO FORM: JE A ISON, ,4e? City Attorney VCI TELCOM, INC. (which will do business in California AT*as VCI Telcom, Inc.) A A By: Print me : John Xanthos Title: President By: Print liant--: XV. Marovish _._. Title: Assistant Treasure - 3 - EXHIBIT A SCHEDULE D CITY OF VERNON FIBER OPTIC NETWORK EXTENSION PHASE V - CONTRACT FO 2003 OPTIONAL TASK - BUSINESS EXTENSIONS Purchase Order No. SO420 CONTRACT Contract Item SCHEDULE Description A. 1 Stand and Hardware 2 Aerial Fieber Placement 3 Overlash to Existing Plant 4 Delash and Relash 5 Down Guy to Existing Anchor Placement 6 Guard Arm Placement 7 Cable Arm Placement 8 5' Extension Arm Placement 9 8'-10' Extension Arm Placement 10 Aerial slack loop w/Snow shoes 11 Aerial splice Enclosure slack loop 12 Lower/Raise existing slack loo9p 13 Lower/Raise existing Splice Enclosure 14 Rearrangement/Cable Move 15 Cable Marking w/City I.D. Information 16 Bonding 17 Dirt Anchor Placement 18 Concrete Anchor Placement 19 Miscellaneous Work (Itemize Separately and Show total price 20 Traffic Control Includes arrowboard/safety 21 OT 1 1/2 Rate Per Man Hour Standby time for Building entrances (Crew Rate to be used per 22 application) 23 Pole to building -Self support slack span with stand 24 Building attachment 25 Fiber ran inside building 26 Service drop placement 27 Building Entrance Penitration 28 Place up two 3-1 1/4" innerducts <500' 29 Place up two 3-1 1/4" innerducts >500' 30 Fiber fusion splicing -test and document (up to 6 fibers) 31 Fiber fusion splicing -test and document (6 to 12 fibers) 32 Fiber fusion splicing -Document and test (12 to 36 fibers) 33 Fiber fusion splicing -test and document ( over 36 fibers) 34 2 man houriy crew rate with equipment 35 3 Man Hourly Crew rate with equipment 36 4 Man hourly crew rate with equipment 37 Ring Cut/Mid Entry 38 Prep New Splicing Enclosure 39 Prep/Install 12 port rack mount Patch Panel 40 Terminate 12 Fibers in the new P.P. 41 Splices at the Splice Enclosure 42 Miscellaneous Work (Itemize Separately and Show total price) 43 Re -Entry existing Enclosure (each) Unit Production Price Amount Price Extension $ 0.67 $ - $ 0.67 $ - $ 0.75 $ $ 0.90 $ - $ 46.00 $ - $ 50.00 $ - $ 110.00 $ - $ 135.00 $ - $ 260.00 $ - $ 155.00 $ - $ 220.00 $ - $ 112.00 $ - $ 112.00 $ - $ 25.00 $ - $ 2.00 $ - $ 25.00 $ - $ 385.00 $ - $ 485.00 $ - TBD $ 80.00 $ - $ 23.40 $ - TBD $ 3.00 $ - $ 35.00 $ - $ 3.50 $ - $ 2.65 $ - $ 65.00 $ - $ 1.90 $ - $ 1.45 $ - $ 45.00 $ - $ 40.00 $ - $ 35.00 $ - $ 32.00 $ - $ 141.00 $ - $ 184.00 $ - $ 219.00 $ - $ 125.00 $ - $ 200.00 $ - $ 100.00 $ - $ 150.00 $ - $ 40.00 $ - TBD $ 125.00 $ - er � JVo y ,1 OFF INTEROFFICE MEMORANDUM qq,,j Light & Power Department DATE: January 30, 2007 C�2— - TO: Eric T. Fresch, Acting City Administrator FROM: Donal O'Callaghan; Director of Light & Power Fes. jZq Z SUBJECT: VCI Telcom, Inc. Contract No. FO 2003 Amendment I recommend an amendment to the Fiber Optic System Division's Contract No. FO 2003 to allocate additional $150,000.00 funds for the expansion of the fiber optic network for City's use and Vernon business building connections to Internet Services. Contract No. F02003 was signed three years ago with VCI Telcom, Inc. and included a task which provided $100,000 fund for fiber optic expansions. To date, a number of buildings have been connected to the fiber optic network using contract F02003 and the original designated fund is now depleted. The Department is in the process of interconnecting a number of new buildings in the City for a fee and also plans to expand the city owned network for its use when required. VCI Telcom, Inc. has been providing this service according to the Contract Fee Schedule and has agreed to continue its service per fee schedule that was originally agreed upon in 2003. Should you need additional information, please let me know. DOClarn Attachments C: L& P Document Control - Fiber Optic Contract F02003 Bey a n d B eay�we�e,n Ci�t�y oaf I/e rn o n 7an, ACH, Inc,, a S V lvan#tea S�eruic�es, Inc, TABLE OF CONTENTS Page A. INFORMATION FOR CONTRACTORS..................................A-1 1. General ...................................................A-1 2. Contract Documents.........................................A-1 3. License....................................................A-1 4. Proposals..................................................A-1 5. Contract and Bonds.........................................A-2 6. Addenda....................................................A-2 7. Insurance and Financial Requirements ....................... A-2 8. Preliminary Estimate.......................................A-3 9. Project Description........................................A-3 10.Project Map ................................................ A-5 B. CONTRACT PRICING FORM PROPOSAL TO THE CITY OF VERNON......... B-1 1. Proposal...................................................B-1 2. Contract Pricing Form......................................B-1 3. Materials ................................................B-3 4. Subcontractors ...........................................B-5 5. Bonds......................................................B-6 6. Principals ......... ...................... ..............B-6 7. License and Signature......................................B-7 8. Contractor's Qualifications................................B-7 C. CONTRACT.....................................................C-1 Article 1. GENERAL ................................. ........ C-1 Section 1. Scope of Work....................................C-1 Section 2. Consideration....................................C-1 Section 3. Payments.........................................C-1 (a)Progress Payments.......... ...........................C-1 (b)Final Payment ........ ...................................C-2 (c)Payment of the Retention ............ ...................C-2 Section 4. Contract Documents...............................C-2 Section 5. Compliance with Provisions of Law................C-2 Section 6. Costs and Attorney's Fees........................C-2 Section 7. Notices ........................... ....... ........C-3 Section 8. Conflict with Plans and Specifications ........... C-3 Section 9. Assignment ....................................... C-3 Section 10. Paragraph Headings..............................C-3 Section 11. Authority of the City's Representative .......... C-3 Article 2. INSURANCE, INDEMNIFICATION and BONDS ..............C-3 Section 12. Insurance.......................................C-3 Section 13. Indemnification.................................C-4 Section 14. Workers' Compensation ........................... C-4 Section 15. Labor and Material Bond .........................C-4 Section 16. Performance Bond .................. ............C-4 Article 3. PERFORMANCE.......................................C-5 Section 17. Time for Completion ............................. C-5 Section 18. Force Majeure...................................C-5 Section 19. Utility Relocation..............................C-5 Section 20. Public Convenience..............................C-6 (a)Excavation Safety .......... ............................C-6 (b)Trenches........................................... ...C-7 (c)Removal of Materials....................................C-7 (d)Closure .................................................C-8 Section 22. Extra Work......................................C-8 Section 23. Clean Up ........................................ C-8 Section 24. Materials.......................................C-8 (a)New Materials and Equipment ............................. C-8 (b)Inspection of Materials.................................C-8 (c)Defective Equipment or Materials ........................ C-9 (d)Storage of Materials .................................... C-9 Section 25. Permits and Licenses ............................C-9 Section 26. Land and Rights of Way ..........................C-9 Section 27. Plans and.Drawings ...........................C-10 Section 28. Shop Drawings Submitted by the Contractor ...... C-10 Section 29. Supervision by the Contractor ..................C-11 Section 30. Inspection of Work ............. ...............C-11 Section 31. Suspension of Work.............................C-12 Section 32. Correction of Defective and/or Unauthorized WorkC-12 Section 33. Errors or Discrepancies Noted by the Contractor C-12 Section 34. Equipment......................................C-13 Article 4. MISCELLANEOUS....................................C-13 Section 35. Damages for Delay ................ ............C-13 Section 36. Guarantee......................................C-14 Section 37. Risk of Loss Prior to Final Acceptance ......... C-14 Section 38. Termination....................................C-14 (a)Termination (Contractor's Default).....................C-15 (b)Optional Termination of Contract by City (Contractor Not at Fault) ........................ ........ ........... --- C-16 Section 39. Standard Specifications ........................C-16 D. BOND FORMS AND INSURANCE REQUIREMENTS ........................ D-1 THROUGH D-11 E. SPECIAL PROVISIONS ......................................... E-1 THROUGH E-8 F. SCHEDULES Schedule A - Contract Pricing Form Schedule B - Contract Pricing Form Schedule C - Contract Pricing Form Schedule D - Optional Task Pricing Form G. APPENDICES - DETAILED PLANS AND SPECIFICATIONS Appendix A - Project Map Appendix B - Splice Enclosure Locations Appendix C - Schedule Drawings C.1 thru C.12 Appendix D - Aerial Make Ready Sheets C.1, C.5 and C.7 Appendix E - Make Ready Plans Sheets 1 thru 7 Appendix F - Aerial Make Ready Sheets 1-13 Appendix G - Cable Testing Logs ii A. INFORMATION FOR CONTRACTORS 1. GENERAL The work hereunder must be done in strict conformity with the plans and specifications adopted and approved by the City for Contract No. FO 2003. 2. CONTRACT DOCUMENTS (a) The Contract Documents shall consist of the following: Information for Contractors Contract Pricing Form Proposal Contract Performance Bond Labor and Material Bond Proof of Insurance Workers' Compensation Certificate Special Provisions Detailed Plans and Specifications (b) All terms and conditions contained in the Contract Documents shall become a part of the Contract entered into between the Contractor and the City. The City Council of the City reserves the right to reject any and all proposals, and to waive any and all irregularities in any proposal. 3. LICENSE A proposal submitted by a Contractor accordance with the provisions of Division Business and Professions Code of the State be considered for award. 4. PROPOSALS who is not licensed in III, Chapter 9, of the of California will not (a) Proposals must be made in accordance with the following instructions: (1) Proposal shall be made on the Contract Pricing Form Proposal furnished by the City as a part of Contract No. FO 2003. The Proposal shall be properly executed with the signatures of all signatories written in longhand. All blank items shall be filled in. Numbers shall be spelled out and written in Arabic figures. If the words and Arabic figures are different, the words shall be used and the Arabic figures disregarded. Erasures, interlineations or other corrections shall be authenticated by affixing next to the mark or correction, or in the margin immediately adjacent thereto, the initials of the signatory(ies) to the proposal. If the unit price and the total amount set forth by a Contractor, for any item, are not in the Contract Pricing Form Proposal, the unit price alone shall be considered as representing the Contractor's intention, and the totals shall be corrected to conform thereto. - A-1 - (2) Contractor must submit proposal on all of the schedules set forth in the Contract Pricing Form Proposal. (3) Proposal shall not contain any recapitulation of the work to be done. Alternative proposals will not be considered except as specified. Oral, telegraphic and/or telephonic proposals or modifications will not be considered. (b) Before submitting a proposal, Contractor shall: read Contract No. FO 2003, especially the Special Provisions and Appendices A-G, and all other Contract Documents with care; visit the site of the work, and; be fully informed about all the existing conditions and limitations. The Contractor should also be fully aware of the bond and insurance requirements on the successful Contractor. The proposal shall specify the amounts to cover the cost of all items included in Contract No. FO 2003. No allowance will be made because a Contractor failed to examine the Contract Documents or obtain the requisite knowledge about the project prior to submitting its proposal. 5. CONTRACT AND BONDS (a) The form of Contract that the Proposer, as the Contractor, will be required to execute is included in the Contract Documents, and should be examined by the Contractor with care. The Contract, bonds and other documents to be executed by the Contractor shall be executed in original triplicate stamped according to law. One original shall be filed with the City Clerk and the others with the appropriate City departments. (b) At the time the Contract is executed, the Contractor will be required to furnish and maintain the following: (1) a Labor and Material Bond in an amount equal to 100% of the Contract price and (2) a faithful Performance Bond in an amount equal to 100% of the Contract price. The bonds shall be secured from a surety company that the City finds acceptable. The surety's name must be on file with the County Clerk of Los Angeles County and/or the California Department of Insurance as an approved and financially sound surety company, authorized to transact business in this state. The bonds shall meet all of the requirements and contain all of the conditions specified in Sections 3247 and 3248 inclusive, of the Civil Code, and other applicable provisions of the law and/or regulations of the State of California. 6. ADDENDA Any addenda issued before the time in which to submit bids expires, and included as a part of the Contract Documents furnished to the Contractor for preparation of its proposal, shall be covered in the proposal and shall be a part of the Contract. 7. INSURANCE AND FINANCIAL REQUIREMENTS (a) Before entering into the Contract, the Contractor shall - A-2 - furnish evidence that workers' compensation insurance, public liability, property damage insurance, and all other insurance specified in the insurance schedule set forth at page D-8 has been procured. The insurer must be an insurance company admitted in and authorized to do business in California and maintain a rating that is acceptable to the City. The insurance procured must be maintained in full force and effect for the entire duration of the Contract (b) Before the Contract is awarded, the Contractor upon request shall furnish a recent statement of said Contractor's financial condition and previous construction experience or such other evidence of the Contractor's qualifications, as may be required by the City. If not previously provided to the City, the Contractor shall furnish a recent statement of its financial condition and previous construction experience or such other evidence of its qualifications before entering into the Contract. 8. PRELIMINARY ESTIMATE The preliminary estimate of quantities of work to be done and material to be furnished, as shown in the Contract Documents, are approximations and are given as a basis for establishing overall project cost. The City does not expressly, or by implication, agree that the actual amount of work will correspond with the preliminary estimates.. The City reserves the right to increase or decrease the quantity of any item or portion of the work or to omit portions of the work, as it deems necessary or expedient. The Contractor shall not at any time after the submission of the proposal have any claim for damages as a result of lowering of anticipated profits or the loss of profits because of any difference between the quantities of work actually done and those stated in its bidding sheets. Each proposal item should be priced to carry its pro-rata share of the costs, overhead and profit. Contractors are cautioned against unbalancing their proposal by including more than a pro- rata share of overhead and profit in any proposal item. 9. PROJECT DESCRIPTION Contract No. FO 2003 involves the City of Vernon requirements to build on its citywide optical fiber cable backbone to interconnect its remote facilities to its control and monitoring center using electronic and optical components. Contract FO 2003, Fiber Optic Network Extension, Phase V, consists of placing fiber optic cables along the City's public rights -of -way on City owned power poles and underground structures. The Project is broken down into two categories, backbone construction and remote facilities connections. The backbone construction task requires a 288-count single mode optical fiber cable (referred to as "backbone optical fiber cable") to be installed between the identified end locations of each segment. The end points require 24-count single mode optical fiber cables (referred to as "lateral optical fiber cable") to be installed - A-3 - between new aerial splice enclosures and the City remote facilities. These laterals will interconnect Programmable Logic Controllers (PLCs) and Remote Terminal Units (BTUs) to the City's Supervisory Control and Data Acquisition (SCADA) system. The Contractor shall perform acceptance testing on all optical fiber strands impacted by the Project for the City's review and approval prior to submitting the request for final payment. Project Map (Appendix A) shows the proposed construction route and Make Ready Plans detail the line construction. Splice Enclosure numbering and locations are identified in Appendix B. The City facilities to be connected to the optical network consist of: 1. Well 11 2. Well 15 3. Well 16 4. Well 18 5. Well 19 6. Well 20 7. Booster Plant 3 8. Pumping Plant 1 9. Coldgen Plant 10. Growgen Plant 11. Kinetics Substation 12. Bee -Jay Substation 13. Container Substation 14. Pulpgen Plant 15. Downey Sump 16. Washington Sump Optional Task• From time to time during the term of this Contract, the City shall provide the Contractor with a work plan to construct fiber optic cable extensions into interested business facilities in Vernon. The Contractor shall furnish and install all necessary material and labor to complete the work plan. The Contractor shall invoice the City according to the unit pricing outlined in Schedule D. - A-4 - 10. PROJECT MAP (See attached map) - A-5 - B. CONTRACT PRICING FORM PROPOSAL TO THE CITY OF VERNON 1. PROPOSAL WORK TO BE PERFORMED: Fiber Optic Network Extension - City Facilities - Phase V, Contract No. FO 2003 Name of Contractor: VCI TELCOM, Inc Business Address: 1921 W. llth Street, Upland, CA 91786 Phone Number: (909) 946-0905 Place of Residence: Upland, California The site of the work to be performed and referred to herein is in the County of Los Angeles, California. The work to be performed will be in accordance with the specifications and Contract Documents of Contract No. F0 2003 TO THE CITY COUNCIL OF THE CITY OF VERNON: Pursuant to and in compliance with the Contract Documents, the undersigned Contractor, having become familiar with the terms of the Contract, and the cost of the work at the place where the work is to be done, hereby proposes and agrees to perform the Contract within 60 calendar days after issuance of a "Notice to Proceed" or commencement of work, whichever occurs first, including all of its component parts and everything required to be performed, and to provide and furnish any and all of the labor, material, tools, expendable equipment, and all utility and transportation services necessary in order to perform the Contract and complete in a workmanlike manner all of the work required as specified in Contract No. FO 2003 , all in strict conformity with the plans and specifications and other Contract Documents, including Addenda Numbers 01 01 , and on file in the office of the City Clerk. The undersigned, as Contractor, declares that the only persons or parties interested in this proposal as principals are those named herein, and that this proposal is made without collusion with any person, firm or corporation. The Contractor proposes and agrees that if this proposal is accepted, the Contractor will execute a Contract with the City that is in substantially the same form as the Contract set forth in the Contract Documents. 2. CONTRACT PRICING FORM The undersigned, as Contractor, agrees that the Contractor will accept in full payment thereof the following not -to -exceed and unit prices, to wit: - B-1 - Perform all the work as specified herein and shown on the Plans and Specifications of Contract No. FO 2003. The total proposal price amount includes furnishing all labor, materials, equipment, mobilization, traffic control, disposal of all removals, permits, fees, overhead, profit and taxes associated with the completion of all of the work in place. City shall pay the Contractor for the completion of the work in accordance with the Contract Documents an amount in current funds not -to -exceed the sum of the amounts determined pursuant to paragraphs 2.1, 2.2, 2.3, 2.4 and the Optional paragraph 2.5 below: 2.1 Schedule A For all Work listed on Schedule A, Contract Pricing Form Proposal other than Unit Price Work, a not -to -exceed sum of: Sixty -Five Thousand Eight Hundred Twenty -One Dollars and Fifty Cents $ 65,821.50 (use words) 2.2 Schedule B For all Work listed on Schedule B, Contract Pricing Form Proposal other than Unit Price Work, a not -to -exceed sum of: Eighteen Thousand Five Hundred Twenty -Four Dollars and Fifty Cents $ 18,524.50 (use words) 2.3 Schedule C For all Work listed on Schedule C, Contract Pricing Form Proposal other than Unit Price Work, a not -to -exceed sum of: Eighty -Nine Thousand Three Hundred Eighty -Two Dollars and Fifty Cents $ 89,382.50 (use words) 2.4 Schedules A, B and C For all Work listed on Schedules A, B and C, Contract Pricing Form other than Unit Price Work, a not -to -exceed sum of: One Hundred Seventy -Three Thousand Seven Hundred Twenty -Eight Dollars and Fifty Cents $ 173,728.50 (use words) 2.5 Optional Item - Schedule D. For all Work listed on Schedule D, Contract Pricing Form other than Unit Price Work, a not -to -exceed sum of: One Hundred Thousand Dollars and No Cents $ 100,000.00 (use words) 2.6 Total Sections 2.4 and 2.5: Two Hundred Seventy -Three Thousand Seven Hundred Twenty -Eight Dollars and Fifty Cents $ 273,728.50 (use words) It is understood that the foregoing quantities are approximate only and are solely for the purpose of facilitating the comparison of Proposal, and that the Contractor's compensation will be computed upon the basis of the actual quantities in the complete work, whether they be more or less than those shown. 3. MATERIALS The name and address of the manufacturer for each type of material upon which this proposal is based is as follows: CSC - Communications Supply Corporation 6400 Artesia Blvd. Buena Park, CA 90620-1006 (714) 670-7711 (Office); (714) 670-8811 (Fax) Materials provided are fiber cable, patch panels and jumpers Telewire Supply 2191 South Burgundy Place Ontario, CA 91761 (909) 605-2901 (Office) Materials provided are pole line hardware Cal Duct Inc. 2625 S. Lilac Ave. Bloomington, CA 92316 (909) 877-0577 (Office) Materials provided are conduit, innerduct and cable lube Southwest Power Inc. 9837 Pioneer Blvd. Santa Fe Springs, CA 90670-0337 (562) 801-4577 (Office) Materials provided are pole line hardware and lineman safety products 4. SUBCONTRACTORS The Contractor as general contractor hereby identifies the subcontractors on the job for each particular trade or subdivision of the work with each firm name and principal location of the mill, shop or office when the value of the work, labor or service performed is in excess of one-half of one percent of the total proposal. The Contractor agrees that there shall be no substitution of subcontracting except upon compliance with the "Subletting and Subcontractors Fair Practices Act," as amended, (Public Contract Code Sections 4100, et seq.). (Instruction: List only one subcontractor for each such portion.) DIVISION OF PRINCIPAL WORK OR TRADE NAME OF FIRM OR CORPORATION LOCATION Fiber Splicing and Testing Westcoast Communications Inc. 1921 W. 11 St. 909-949-1350 (Office) Upland, CA 91786 909-949-6850 (Fax) 5. BONDS The undersigned agrees to provide the City with a Performance Bond and Labor and Material Bond in the form set forth in the Contract Documents within seven (7) calendar days after the date of mailing of the acceptance. The surety will be one that the City finds acceptable. 6. PRINCIPALS The names of all persons interested in this Contract Proposal as principals are as follows: Royce Jaime, President Al Ruiz, Secretar Brett Johnson, Vice President 2W-WM 7. LICENSE AND SIGNATURE The undersigned is licensed in accordance with California Business and Professions Code, License No. Name of Contractor: VCI TELCOM, INC. Signature of Contractor: Title: Royce Jaime, President Title: Al Ruiz, Secretar Dated: NOTE: The complete and proper legal name of the Contractor shall be set forth above. If the Contractor is a corporation, two signatures are required, as follows: (1) the chairman of the board, the president, or any vice- president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any assistant treasurer. If the Contractor is a limited liability company, signatures are required of two members or managers unless otherwise provided in the company's articles of organization. If the Contractor is a partnership, signatures are required of the partner or partners authorized to sign contracts on behalf of the partnership. 8. CONTRACTOR'S QUALIFICATIONS The Contractor must have a minimum of five (5) years of experience as an ongoing business enterprise in the specific type of work indicated in the proposal. The following contracts which show experience in work of similar scope to that covered in the proposal and which have been satisfactorily completed in the past five (5) years are: YEAR NAME OF FIRM AND ENGINEER LOCATION CONTRACT AMOUNT 2002 City of Anaheim; Castor Williams Anaheim $1.1 million 2002 Williams Communications Riverside $4 Million 2003 City of Claremont; Kirk Phillips Claremont $250,000.00 2003 City of Pico Rivera Michael Moore Pico Rivera $450,000.00 2003 Level 3 Communications; Chris Pida Pasadena $467,000.00 2003 SCE; Ben Gongora Various $900,000.00 2003 XO Communications; Various Lee Arnold So Cal $210,000.00 2003 SBC; Steve Acheson Orange Co. $400,000.00 The Contractor, as a contractor, has never failed to satisfactorily complete an awarded contract, except as follows: N/A I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. By: Name: - B-8 - C. CONTRACT THIS CONTRACT FOR Fiber Optic Network Extension - City Facilities - Phase V, Contract No. FO 2003 is made, entered into, and executed in triplicate in the City of Vernon, California, as of the day of July, 2003. BY AND BETWEEN AND CITY OF VERNON, a municipal corporation hereinafter referred to as "City" 4305 Santa Fe Avenue Vernon, CA 90058 VCI Telcom, Inc., a subsidiary of Quanta Services, Inc. 1921 W. llth Street Upland, CA 91786 hereinafter referred to as "Contractor" IN CONSIDERATION OF THE MUTUAL PROMISES, COVENANTS AND CONDITIONS HEREIN SET FORTH, THE PARTIES DO HEREBY AGREE AS FOLLOWS: ARTICLE 1. GENERAL Section 1. Scope of Work The Contractor will furnish all labor, equipment and materials and will perform all work described in the Contract Documents attached hereto and hereby incorporated by reference. Section 2. Consideration The City shall pay the Contractor for the performance of the work hereunder in accordance with the amounts set forth in Contract Pricing Form Proposal attached hereto and hereby incorporated by reference. Section 3. Payments (a) Progress Payments The City shall make progress payments to the Contractor based upon the milestones achieved. The progress payments shall be made as follows: 1) 30% upon completion of strand placement with its associated hardware and proof of purchase of Equipment as described on Schedule B of the Contract Pricing Forms; 2) 30% upon placement of fiber optic cable completely lashed with the exemption of splicing and termination work; 3) 30% upon completion of hardware placement for the City facilities extensions with the exemption of splicing and termination work; and 4) 10% upon completion of acceptance testing with satisfactory results after splicing and termination work for the backbone and City facilities. - C-1 - The City shall pay the Contractor, the amount of the approved progress payment, less 10% retention. The progress payment may also be reduced by the following: (1) amounts due to the City for equipment, services or materials furnished by the City in connection with work done on the project; (2) amounts of any claims or liens, and (3) amounts required to be deducted by Federal, State or local governmental authorities. Payment shall be made within twenty (20) calendar days of receipt of the Contractor's progress payment invoice. No progress payment shall be construed as acceptance of the work, or any portion thereof, nor shall such payment preclude the City from demanding and recovering from the Contractor such damages as may be sustained by reason of the Contractor's failure to fully perform under the Contract. (b) Final Payment Upon satisfactory completion of the work described herein, the Contractor shall furnish the City with a complete and final accounting of all labor, materials, and other costs. The City shall pay the Contractor according to the payment terms set forth in Section 3(a). (c) Payment of the Retention Payment of the retention shall be made thirty-five (35) calendar days after the recordation of a Notice of Completion by the City or if a Notice of Completion is not recorded sixty-five (65) calendar days after acceptance of the completed project. The acceptance will be made only by an action of the City Council of the City. Acceptance of payment of the retention by the Contractor shall constitute a waiver of all claims against the City arising under this Contract. Section 4. Contract Documents The complete Contract includes the Contract Documents set forth herein, including: (1) Information for Contractor, (2) Contract Pricing Form Proposal, (3) Contract, (4) Performance Bond, Labor and Material Bond, Proof of Insurance, Workers' Compensation Certificate, (5) the Special Provisions, and (6) detailed Plans and Specifications, Section 5. Compliance with Provisions of Law The Contractor shall comply with all applicable provisions of law whether Federal, State, or local relating to its performance under the Contract. Section 6. Costs and Attorney's Fees In any action or proceeding brought to enforce the provisions of this Contract, the court shall award reasonable costs and - C-2 - expenses, including reasonable attorney's fees, to the prevailing party. Section 7. Notices Any notice required or permitted hereunder shall be given by personal delivery or by first class mail, postage prepaid, To: Contractor VCI Telcom, Inc. 1921 W. 11TH Street Upland, CA 91786 To: City Clerk City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Section 8. Conflict with Plans and Specifications Any conflict between the plans and specifications and this Contract shall be brought to the attention of the City's Representative for resolution. Section 9. Assignment The Contractor shall not assign the Contract or the payments due under the Contract. Section 10. Paragraph Headings The paragraph headings herein are for the convenience of the parties and shall not affect the interpretation of the Contract. Section 11. Authority of the City's Representative The City's Representative shall decide all questions which may arise regarding the quality and/or acceptability of materials furnished, the manner and/or acceptance of the Contractor's performance, the rate of progress, and the interpretation of the plans and specifications. ARTICLE 2. INSURANCE, INDEMNIFICATION AND BONDS Section 12. Insurance The Contractor shall provide the City with proof of insurance naming the City and its consultants and each of its directors, officers, agents, and employees as additional -named insureds on a policy or policies of insurance providing and maintaining the coverages set forth in the Insurance Schedule contained herein. - C-3 - Said coverage is not required for the active negligence of the City to the extent that indemnification for the City's active negligence would be invalid under Section 2782(b) of the California Civil Code. The proof of insurance shall also provide that said policy or policies are not to be canceled or materially reduced without giving the City at least 30 days written notice. Section 13. Indemnification The Contractor shall indemnify, protect, defend, and hold harmless the City and its consultants, and each of its directors, officers, agents, and employees from and against any and all claims, demands, losses, damages, liabilities, fines, charges, penalties, orders, judgments, and all costs and expenses incurred in connection therewith, including reasonable attorneys' fees and costs of defense arising, directly or indirectly, in whole or in part, out of the services performed under this Contract, except to the extent arising from or caused by the sole active negligence or willful misconduct of the City, its officers, agents, or employees. Section 14. Workers' Compensation The Contractor shall secure payment of compensation to Contractor's employees pursuant to Labor Code Section 3700, and shall obtain employers' liability insurance as set forth in the Insurance Schedule. Prior to commencing work hereunder, the Contractor shall submit to the City the Workers' Compensation Certificate or an executed certificate of workers' compensation insurance as provided herein. Such insurance shall include a waiver of subrogation endorsement naming the City, and its consultants, and each of its directors, officers, agents, and employees. Section 15. Labor and Material Bond The Contractor shall execute and deliver to the City for its approval and acceptance a Labor and Material Bond in an amount equal to the total amount payable under the terms of this Contract. Said bond shall be payable by surety or sureties to the City in the event the Contractor fails to pay its subcontractors for labor and material used in this project. Said bond shall be in substantially the same form as that attached hereto. The surety will be one that the City finds acceptable. Section 16. Performance Bond The Contractor shall execute and deliver to the City for its approval and acceptance a Performance Bond in an amount equal to the total amount payable under the terms of this Contract. Said bond shall be payable by surety or sureties to the City in the event the Contractor fails to fully perform under this Contract. Said bond shall be in substantially the same form as that attached hereto. The surety will be one that the City finds acceptable. - C-4 - ARTICLE 3. PERFORMANCE Section 17. Time for Completion The work shall be completed in the number of calendar days specified in the Contract Pricing Form Proposal. The Contract completion day may be extended, at the City's sole discretion, for an additional thirty (30) days, or such other time as the City deems necessary to complete the work specified herein. Section 18. Force Majeure Neither Party shall be considered to be in default in any of its obligations under this Agreement when a failure of performance shall be due to an uncontrollable force. The term "uncontrollable force" shall mean any cause beyond the control of the party affected, including, but not restricted to, flood, earthquake, storm, fire, lightening, epidemic, war, riot, civil disturbance or disobedience, sabotage, or embargoes of the United States Government or any other government, which by exercise of due diligence such party could not reasonably have been expected to avoid and by exercise of due diligence has been unable to overcome Either party rendered unable to fulfill any of its obligations under this Agreement by reason of an uncontrollable force, shall give written notice within five (5) business days of such fact to the other party and shall exercise due diligence to remove such inability with all reasonable dispatch. Section 19. Utility Relocation (a) The City will identify the main and/or trunk lines in the plans and specifications. The City is responsible for the timely removal, relocation or protection of existing main and/or trunk line utility facilities located on the construction site, unless such utilities facilities are identified by the City in the plans and specifications. The City shall pay the costs of removing or relocating utility facilities not identified in the plans and specifications with reasonable accuracy, repairing damage not due to the Contractor's failure to exercise reasonable care, and equipment on the project necessarily idled during such work. The Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay is caused by the failure of the City or the utility owner to provide for the removal or relocation of such utility facilities. (b) Nothing herein shall be deemed to require the City to indicate the presence of existing service laterals or appurtenances whenever the presence of such utilities on the construction site can be inferred from the presence of other visible facilities, such as buildings or metering junction boxes on or adjacent to the construction site. (c) If the Contractor, while performing the Contract, - C-5 - discovers utility facilities not identified by the City in the plans or specifications, the Contractor shall immediately notify the City's Representative and the utility owner in writing. Section 20. Public Convenience (a) The Contractor's operation shall not unnecessarily cause any public inconvenience. The access rights of the public shall be considered at all times. Unless otherwise authorized, traffic shall be permitted to pass through the work or an approved detour shall be provided. Safe, adequate, continuous and unobstructed pedestrian and vehicular access shall be maintained to fire hydrants, water valves, residences, commercial and industrial establishments, churches, schools, parking lots, service stations, motels, fire and police stations, and hospitals, unless other arrangements are made satisfactory to owners thereof. (b) Vehicular access to residential driveways shall be maintained to the property line except when necessary construction precludes such access for reasonable periods of time. (c) Grading operations, roadway excavation and embankment construction shall be conducted by the Contractor in a manner to provide a reasonably satisfactory surface for traffic. When rough grading is completed the roadbed surface shall be brought to a smooth, even condition satisfactory for traffic. (d) The Contractor shall comply with all applicable State, County and City requirements for the closure of streets. The Contractor shall provide barriers, guards, lights, signs, temporary bridges, flagmen and watchmen advising the public of detours and construction hazards. The Contractor shall also be responsible for compliance with additional public safety requirements that may arise during construction. The Contractor shall furnish and install and, upon completion of the work, promptly remove all signs and warning devices. (e) At least 48 hours in advance of closing or partial closing or of reopening any street, alley, or other public thoroughfare, the Contractor shall notify the police, fire, traffic and engineering departments of the City and any other jurisdictional agencies involved and shall comply with their requirements. Section 21. Excavations (a) Excavation Safet During the excavation of trenches five (5) feet or more in depth, the Contractor shall submit to the City, for its approval, a detailed plan showing the design of shoring, bracing, sloping, and other provisions to be made for worker protection from the hazard of caving ground. Said plan shall be at least as effective as that required by the Construction Safety Orders of the California Division of Industrial Safety. If the Contractor's plan varies from the - C-6 - (BANK OR SAVINGS AND LOAN ASSOCIATION LETTERHEAD) Date: S A M City of Vernon P 4305 Santa Fe Avenue L Vernon, CA 90058 E IRREVOCABLE LETTER OF CREDIT Contract Gentlemen: Please consider this letter as an Irrevocable Letter of Credit pledging that * in the amount of $ is/are deposited and guaranteed to insure the Contractor's faithful performance under Contract No. 561 in lieu of withholding any funds due the Contractor under progress payments. In compliance with Part 5 (commencing with Section 22300) of Division 2 of the California Public Contract Code, we agree that the funds or other securities designated by this instrument shall become trust funds for the purposes set forth in this instrument. This instrument shall terminate upon formal acceptance by the City Council of the City of Vernon of the work performed by the Contractor under said Contract. Any claims under this Irrevocable Letter of Credit shall be presented in the following manner: The City's written statement, signed by the Director of Community Services, certifying that there has been loss, damage or liability resulting from the Contractor's duties and obligations under Contract, or from negligence, act or omission of the Contractor, its agents, servants and employees (such statement to be substantiated by an attached detailed report) in the amount of the accompanying sight draft on us and that the amount of this draft is therefore now due and payable. The above statement will be all that is required to certify the amount set forth under this Irrevocable Letter of Credit, dated this date, is due and payable to the City of Vernon pursuant to the above -stated Contract No. (Name of Bank or Savings and Loan Association) 0 �0 President Secretary ALL SIGNATURES MUST BE NOTARIZED Attach proper jurats • Securities as listed in Section 16430 of the Government Code, or - D-12 - shoring system standards established by said Safety Orders, the plan shall be prepared by a registered civil or structural engineer. (b) Trenches When the project involves digging trenches or other excavation that extend deeper than four (4) feet below the surface, the following provisions apply: (1) The Contractor shall promptly, and before the following conditions are disturbed, notify the City, in writing, of any: (i) Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. (ii) Subsurface or latent physical conditions at the site differing from those indicated. (iii)Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the contract. (2) The City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in the Contractor's cost of, or the time required for, performance of any part of the work shall issue a change order under the procedures described in the contract. (3) In the event that a dispute arises between the City and the Contractor whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in the contractor's cost of, or time required for, performance of any part of work, the Contractor shall not be excused from any scheduled completion date provided for by the contract, but shall proceed with all work to be performed under the contract. The Contractor shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting parties. (c) Removal of Materials Excavation includes the removal of all materials and obstructions of whatever nature. The Contractor shall satisfy itself as to the quantity of acceptable material that may be produced at locations designated by the City, and the City assumes no responsibility for the quantity of acceptable material at designated locations. - C-7 - (d) Closure At the close of each working day, the Contractor shall cover completely all open excavations in the public right-of-way with steel plates in accordance with normal practice in the industry and the rules, regulations, laws and ordinances of the State of California, the County of Los Angeles, and the City of Vernon. Section 22. Extra Work (a) The City may require changes in, additions to, or deductions from the work to be performed or to the materials to be furnished hereunder. No extra work shall be performed or change or addition made without a written order from the City. The written order shall state that the extra work, change or addition is authorized by the City, identify the work that is to be done and method to be used to accomplish the work, and set forth the basis upon which payment is to be made. Nothing in this article shall excuse the Contractor from proceeding with the prosecution of the work so changed. The Contractor shall, when required by the City, furnish an itemized breakdown of the quantities and prices used in computing the amount of any change or addition that might be ordered. The adjustment, if any, in the amount to be paid to the Contractor by reason of any such change, addition or deduction shall be determined by one of the following methods: (1) By applying the unit prices proposal incorporated in the agreement between the City Section 23. Clean Up contained in the Contractor's Contract Documents or fixed by and the Contractor. Upon completion of the work, the Contractor shall remove all debris and surplus materials from the work site. Section 24. Materials (a) New Materials and Equipment Unless otherwise specified, shown, or permitted by the City all material and equipment incorporated in the work shall be new and of current manufacture. The City may request that the Contractor furnish manufacturer's certificates indicating the quality of the material. No material shall be installed until approved by the City's Representative. (b) Inspection of Materials All material furnished hereunder shall be subject to inspection and testing by the City's authorized agents at the City's expense. In the event that such inspection and testing reveals material that does not comply with the Contract Documents, the Contractor shall bear the cost of necessary corrective measures as well as the cost of subsequent inspection and testing. (c) Defective Equipment or Materials The inspection under Section 30(b) shall not relieve the Contractor of any of its obligations under the Contract. Even though equipment or material required to be provided has been inspected, accepted, and included in a monthly pay application, the Contractor shall, at Contractor's expense, replace or repair any such equipment or material found to be defective or otherwise non- compliant with the Contract Documents up through the guarantee period in Section 36. (d) Storage of Materials All material for use in the work shall be stored by the Contractor in such a manner as to prevent damage from exposure to the elements, from admixture of foreign materials or from any other cause. The Contractor shall be solely responsible for damage or loss of materials caused by exposure, weather or other causes. Section 25. Permits and Licenses (a) The Contractor shall apply for and procure all permits and licenses necessary for the work except: None (b) The Contractor shall provide all notices necessary and incidental to the lawful prosecution of the work and shall comply with the terms and conditions of all permits and licenses. (c) The Contractor shall pay all charges and fees in connection with all permits and licenses except those required by the following: None Section 26. Land and Rights of Way (a) The City shall provide, or arrange for the provision of, the land and rights of way upon which the work is to be constructed. (b) The Contractor shall procure any additional rights of way desired by the Contractor to facilitate construction of the work. The Contractor shall enter into written agreements with property owners for such purposes and shall provide the City with copies of such agreements. (c) Except as provided in Section 19, when the work described in the Contract Documents is to be performed in the vicinity of existing improvements, said improvements shall not be disturbed or damaged. However, the Contractor may remove or relocate improvements in the land and rights of way provided by the City pursuant to Section 26(a). - C-9 - Section 27. Plans and Drawings (a) The approved plans may be supplemented by working drawings as are necessary to monitor the work. All drawings shall be consistent with the Contract Documents. All such drawings delivered to the Contractor shall be deemed written instructions to the Contractor. (b) The City will furnish the Contractor with copies of all drawings and specifications reasonably necessary for the execution of the work, at no charge. The Contractor shall keep one set of drawings and specifications in good order at the job site and make them available to the City's Representative and to the Contractor's representatives. (c) The drawings and/or plans will show conditions as the City believes them to exist; but it is not intended or to be inferred that the conditions as shown thereon constitute a representation by the City that such conditions are existent. The City shall not be liable for any loss sustained by the Contractor as a result of any variance of the conditions as shown on the drawings and/or plans and the actual conditions revealed during the progress of the work, or otherwise. Section 28. Shop Drawings Submitted by the Contractor (a) No portion of the work requiring a shop drawing submittal shall be commenced until the submittal has been reviewed by the City and returned to the Contractor with a notation that the City has completed its review of the shop drawing. Shop drawings are drawings, diagrams, illustrations, schedules, performance charts, brochures and other data which are prepared by the Contractor or any subcontractor, manufacturer, supplier or distributor, and which illustrate some portion of the material or work. (b) The Contractor shall review, approve, and submit for review by the City's Representative shop drawings for material and equipment to be incorporated into the work. Four copies of shop drawings shall be submitted to the City with a letter of transmittal listing the drawings submitted. Drawings shall show the name of the project, the name of the Contractor, and the names of suppliers, manufacturers, and subcontractors, if any. Shop drawings shall be submitted with promptness and in orderly sequence so as to cause no delay in progress of the work. (c) Shop drawings shall be complete. If the shop drawings show any deviation from the requirements of the plans and specification because of standard shop practices or other reasons, the deviations and the reasons therefore shall be set forth in the letter of transmittal. (d) By approving and submitting shop drawings, the Contractor represents that material, equipment and other work shown thereon conforms to the plans and specifications except for any deviation - C-10 - identified in the letter of transmittal. (e) Within ten (10) calendar days after receipt of the shop drawings, the City will return two prints of the drawings to the Contractor along with its comments. The Contractor shall resubmit corrected drawings, if the City has so requested. Resubmitted shop drawings shall be processed in the same manner as the original submittals. The Contractor's letter of transmittal accompanying its resubmitted shop drawings shall highlight the revisions requested by the City. (f) The City's Representative will review the shop drawings only for general conformance with the design concept of the project and general compliance with the plans and specifications. The City's review of the shop drawings shall not be construed as relieving the Contractor of its responsibilities under the Contract, including but not limited to: (1) providing material and equipment; (2) ensuring the proper fitting and construction of the pipeline; (3) submitting accurate and complete shop drawings; (4) selecting proper fabrication processes and techniques; and (5) performing the work in a safe manner. Section 29. Supervision by the Contractor The Contractor shall have a designated representative or alternative representative present at the worksite whenever work is in progress. The Contractor's designated representative or alternate representative shall have authority to act for the Contractor. Before starting the work, the Contractor shall inform the City, in writing, of the name of its designated representative. An alternate representative may also be designated. Any communication between the City and the Contractor's representative shall be deemed as a communication to the Contractor. If the Contractor fails to have a designated representative present at the worksite, the City's Representative may give necessary direction or instruction to the superintendent or foreman having charge of the specific work to which the direction or instruction applies. The superintendent or foreman shall comply with the direction or instruction promptly and shall relay the City's communication to the Contractor or its designated representative. Section 30. Inspection of Work (a) The City shall have access to the worksite at all times to review and/or inspect the progress of the work, the workmanship and the material being used. (b) Whenever the Contractor changes its hours of operation, notice shall be given to the City's Representative prior to institution of the change. Any work done in the absence of the City's Representative may be subject to rejection, at the City's discretion. (c) All excavations that are to be backfilled shall be - C-11 - inspected and approved by the City's Representative prior to backfilling. The Contractor shall give the City's Representative advanced notice of the backfilling. (d) Inspection of the work by the City's Representative shall not relieve the Contractor of the obligation to fulfill the Contract. Defective work shall be corrected, notwithstanding the fact that the City's Representative may have previously accepted the defective work. Section 31. Suspension of Work The City Engineer or his designee may orally direct the Contractor to suspend the work in whole or in part when determined by the City Engineer or his designee that the suspension is necessary in the interest of the City. The City Engineer or his designee may also direct the Contractor to subsequently resume performance of all or any part of the work. Such directions from the City Engineer or his designee shall be confirmed in writing. An equitable adjustment in the work completion schedule and price may be negotiated and confirmed by a Change Order or a revision to a task assignment if such suspension impacts the costs of the work and/or work completion schedule. The City shall complete the payments due and properly owing for the suspended work up to the effective date of suspension notice and shall resume payments effective as of the work resumption date, if applicable. Section 32. Correction of Defective and/or Unauthorized Work (a) All work that has been rejected shall be corrected, or removed and replaced by the Contractor, at the City's direction. Any remedial work will be done in a manner acceptable to the City. The Contractor shall pay the remediation and/or removal and replacement costs. The Contractor must obtain written authorization to perform extra or unauthorized work prior to undertaking such work. The Contractor will not be compensated for any unauthorized work. In addition, the City may order the Contractor to remove, at the Contractor's expense, any extra or unauthorized work. (b) The Contractor must comply promptly with any order made by the City under the provisions of this article. If the Contractor fails to comply with the City's orders, the City may in its discretion cause defective work to be corrected by its own forces or by another contractor. The amount that the City paid to correct the defective work will be deducted from any monies due or to become due to the Contractor. Section 33. Errors or Discrepancies Noted by the Contractor (a) If the Contractor, either before commencing work or in the course of the work, finds any discrepancy between the contract, especially the plans, specifications, drawings, and boring logs, or between any of them and the physical conditions at the worksite, or finds any error or omission in any of the plans, specifications, drawings, boring logs, or in any survey, the Contractor shall - C-12 - promptly notify the City in writing of such discrepancy, error, or omission. If the Contractor observes that any plans, specifications, or drawings are at variance with any applicable law, ordinance, regulation, order or decree, Contractor shall promptly notify the City in writing of such deviation or conflict. (b) The City, upon receipt of such notice, shall promptly investigate the circumstances and give appropriate instruction to the Contractor consistent with Section 29. Until such instruction is given by the City Engineer, any work done by the Contractor, either directly or indirectly after its discovery of such error, discrepancy, omission, deviation or conflict, will be at the Contractor's own risk. The Contractor shall bear all costs arising from any work that incorporates such error, discrepancy, omission, deviation or conflict. Section 34. Equipment The Contractor shall furnish equipment and facilities to perform the work to the industry standard in accordance with the plans and specifications. Such equipment and facilities must be in a good state of repair, be maintained in such state during the progress of the work, and shall meet all requirements of applicable ordinances and laws. No worn or obsolete equipment shall be used, and in no case shall the manufacturer's rating of capacity for any equipment be exceeded. ARTICLE 4. MISCELLANEOUS Section 35. Damages for Delay (a) The Contractor acknowledges the City's desire that the project be completed on or before the date specified in the Contract. The Contractor also acknowledges that if its work is not completed on or before said date, the City will incur substantial damages that cannot be ascertained at this time. Accordingly, the Contractor shall pay to the City any and all damages caused by the Contractor's delay in completing the work under the Contract. (b) If the work is not completed in accordance with the foregoing, it is mutually agreed that the City will suffer damage, that it will be impractical and unfeasible to determine the amount of actual damage. Therefore, the Contractor will pay the City, as fixed and liquidated damages and not as a penalty, the sum of $300.00, for each and every calendar day of delay, and that the Contractor and its Surety will be liable for the amount thereof. The Contractor, however, will not be charged liquidated damages because of any delays in the completion of the work due to Force Majeure or acts of the City, acts of another Contractor in the performance of a Contract with the City, and without the fault or negligence of the Contractor. (c) The Contractor shall within ten (10) days from the beginning of any such delay (unless the City grants a further - C-13 - period of time prior to the date of final settlement of the Contract) notify the City in writing of the cause of delay. Upon notification of a delay, the City shall ascertain the facts and extent of the delay and extend the time for completing the work if in its sole discretion its findings justify such an extension. The City's findings shall be final and conclusive on the parties hereto. (d) The City shall have the right to extend the time for completion if it determines such extension to be in the City's best interest. If the City extends the time limit for completing the work by way of a change order at the request of the Contractor, and for other than Force Majeure, it is understood and agreed that such time extension will increase the City's expenses. These expenses include, but are not limited to, the costs associated with engineering, inspection, supervision, incidental and overhead expenses that are directly chargeable to the Contract and that accrue during the period of extension. Therefore, the Contractor acknowledges that the City shall be reimbursed for its expenses before the final payment of the ten percent (10%) retention is made. Section 36. Guarantee The Contractor guarantees all work against defective workmanship, and the materials furnished, for a period of one year from the date the City accepts the work in accordance with Section 3(c). The Contractor shall repair and replace any and all such defective work, together with any other work which may be displaced in so doing, at no cost to the City. The Contractor is not responsible for the repair or replacement of material damaged through ordinary wear and tear, usual abuse, or neglect. The City may proceed to repair or replace defective work and/or material if the Contractor fails to do so within a week after Contractor's receipt of written notice from the City. The Contractor agrees to pay the costs and charges the City incurs in repairing and replacing defective work and/or material upon demand. Section 37. Risk of Loss Prior to Final Acceptance Except as set forth hereinabove relating to Force Majeure, all risk of loss resulting from total or partial destruction of the work, or any part thereof, or any damage thereto, prior to final acceptance of the work by City, shall be borne by the Contractor regardless of the cause. The Contractor, at its sole cost, shall repair or replace such damaged or destroyed work to its prior undamaged condition before being entitled to additional progress payments, the final progress payment or payment of the retention. Such total or partial destruction or damage shall not excuse the Contractor from completion of the work in accordance with the provisions of this Contract. Section 38. Termination - C-14 - (a) Termination (Contractor's Default) (1) The Contractor will be in default if it does any of the following: (a) declares bankruptcy, becomes insolvent, or assigns its assets for the benefit of its creditors; (b) disregards or violates a material provision of the Contract or the City's instructions; (c) fails to prosecute the work according to the approved construction schedule; (d) fails to provide a qualified superintendent, representative, competent workers, or subcontractors; and/or (e) fails to provide materials or equipment that meets the requirements of the plans, specifications, and drawings. The City, will notify the Contractor in writing of such default. Upon receipt of written notice of default, the Contractor shall, at Contractor's expense, preserve at the project site, all construction materials and equipment, and shall undertake immediate steps to remedy such default. (2) If the Contractor fails to remedy such default within ten (10) calendar days after receipt of written notice of default, the City may, at its option, terminate the right to proceed with the work to which default has occurred or may terminate the Contract. Written notice will be provided to the Contractor, but not to the Contractor's sureties. Upon receipt of such written notice, the Contractor shall at its expense and for the work affected by any such termination: (i) assist the City in making an inventory of all material and equipment located at the site, enroute to the site, in storage or manufacture away from the site, and/or on order from suppliers; (ii) assign subcontracts, material and equipment supplier contracts, and equipment rental agreements to the City, as designated by the City; and (iii) remove from the site all construction material and equipment listed in said inventory other than the material and equipment which are to be used by the City in completing the Contract. (3) The City shall have the right to complete the work to which the termination applies. The Contractor agrees that the City shall have the right, for such purpose and for as long as necessary, to designate in writing, take possession of and use any or all of the material, plant, tools, equipment, supplies and property furnished by the Contractor. (4) The cost of completing such work, together with reasonable costs for administering any contract for completion, will be charged to the Contractor. The City will deduct these costs from the sum due or the sum that may become due to the Contractor. If these costs exceed the sum which would have been - C-15 - payable under the Contract, then the Contractor and/or its sureties shall be liable for and, upon written notice from the City, shall promptly pay the excess amount to the City. The City shall not be required to retain the Contractor with the lowest estimate for completion of the work. The City may make any expenditures that, in its sole judgment, best accomplish the completion of the project. If such costs are less than the balance that would have been due, the Contractor shall have no claim to the difference. The City may, however, decide to reimburse the Contractor or the Contractor's sureties for costs incurred for materials, tools, equipment, property, and labor which were used in performing the work and of which the City shall have received the benefit. In computing the costs, as it relates to equipment owned by the Contractor, the salvage value at completion of the work shall be deducted from the depreciated value at the time the Contract was terminated. (b) Optional Termination of Contract by City (Contractor Not at Fault) City may terminate the Contract upon ten (10) days written notice to the Contractor, if it is found that reasons beyond the control of either the City or the Contractor make it impossible or against the City's interests to complete the work. In such a case, the Contractor shall have no claims against the City except for (1) the cost of the work performed up to the date the Contract is terminated, and (2) for the cost of materials and equipment at the site, in transit, or on definite commitment, as of the date the Contract is terminated, provided that such materials and equipment would be needed in the work and meet the requirements of the specifications. The cost of the work performed and the cost of materials and equipment, as mentioned above, shall be determined by the City in accordancewith the procedure prescribed for making of a final progress payment as described in Section 3. Section 39. Standard Specifications The "Standard Specifications for Public Works Construction" (2000 Edition), published by Building News, Inc. is hereby incorporated by this reference and made a part hereof as though fully set forth at length. In the event, however, that said Standard Specifications are inconsistent with the terms of this Contract, including the Special Provisions attached hereto, then this Contract and the Special Provisions shall be deemed controlling. - C-16 - IN WITNESS WHEREOF the parties hereto have executed this Contract or caused it to be executed as of the day, month and year first above written. ATTEST: ME Bruce V. Malkenhorst, City Clerk APPROVED AS TO FORM: By EDUARDO OLIVO, City Attorney M CITY OF VERNON Leonis C. Malburg, Mayor CONTRACTOR Name: VCI TELCOM, INC. WN Royce Jaime Title President By Al Ruiz Title Secretary NOTE: The complete and proper legal name of the Contractor shall be set forth above. If the Contractor is a corporation, two signatures are required, as follows: (1) the chairman of the board, the president, or any vice-president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any assistant treasurer. If the Contractor is a limited liability company, signatures are required of two members or managers unless otherwise provided in the company's articles of organization. If the Contractor is a partnership, signatures are required of the partner or partners authorized to sign contracts on behalf of the partnership. - C-17 - D. BOND FORMS AND INSURANCE REQUIREMENTS Contractor shall provide the City with a Workers' Compensation Certificate in a form substantially similar to that shown herein. Both the Performance Bond and the Labor and Material Bond shall be provided on the forms enclosed herewith. A Sample Letter of Credit is also enclosed as a guide for a Contractor's security. Insurance coverage shall be provided in the types and amounts shown on the Insurance Schedule. A copy of the policy or a notarized letter from the insurance underwriter or carrier verifying the coverage must be provided to the City in order to demonstrate proof of insurance. - D-1 - WORKERS' COMPENSATION CERTIFICATE The undersigned acknowledges that Section 3700 of the California Labor Code requires every employer to be insured against liability for worker's compensation or to undertake self-insurance in accordance with the provisions of that Labor Code. The undersigned agrees to comply with such provisions before commencing the performance of this Contract. CONTRACTOR Name VCI TELCOM. INC. Dated By Title By Title NOTE: The complete and proper legal name of the Contractor shall be set forth above. If the Contractor is a corporation, two signatures are required, as follows: (1) the chairman of the board, the president, or any vice-president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any assistant treasurer. If the Contractor is a limited liability company, signatures are required of two members or managers unless otherwise provided in the company's articles of organization. If the Contractor is a partnership, signatures are required of the partner or partners authorized to sign contracts on behalf of the partnership. Workers' Compensation Certificate - 1 - D-2 - PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS: That WHEREAS, the City Council of the City of Vernon, a municipal corporation, by action on the has awarded to day of hereinafter designated as the "Principal", Contract No. for in Los Angeles County, California; and 2003, WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the faithful performance of said Contract; NOW, THEREFORE, we, the Principal and , as Surety, are held firmly bound unto the CITY OF VERNON hereinafter called the "Obligee," in the penal sum of DOLLARS($ ) lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally and firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that if the abovebounden Principal, his heirs, executors, administrators, successors or assigns shall in all things stand to and abide by, and well and truly keep and perform the covenants, conditions, and agreements in said Contract, and any alteration thereof made as therein provided, on his part to be kept and performed at the time and in the manner therein specified, and in all respects according to their true intent and meaning, and shall indemnify and save harmless the Obligee, its officers and agents, as therein stipulated, this obligation shall become null and void; otherwise it shall be and remain in full force and virtue. And the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract, or to the work to be performed thereunder, or the specifications accompanying the same, shall in any way affect its obligation on this bond, and it does thereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract, or to the work or to the specifications, and said Surety agrees that in case suit is brought on this bond, Surety will pay City's reasonable attorney's fees to be fixed by the court. Performance Bond - 1 - D-3 - IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for all purposes be deemed an original hereof, have been duly executed by the Principal and Surety above named, on the day of 2003. Name (Principal) (Attach Acknowledgment) By Name (Surety) By By ---- (Attorney-in-fact) APPROVED AS TO FORM: EDUARDO OLIVO, City Attorney - D-4 - Performance Bond - 2 LABOR AND MATERIAL BOND KNOW ALL MEN BY THESE PRESENTS: That WHEREAS, the City Council of the CITY OF VERNON, a municipal corporation, by action on the day of awarded to 2003, has hereinafter designated as the "Principal," Contract No. For in Los Angeles County, California; and 01 WHEREAS said Principal is required to furnish a bond in connection with said Contract providing that if said Principal or any of his subcontractors shall fail to pay for any materials, provisions, provender, or other supplies, or teams used in, upon, for or about the performance of the work contracted to be done, or for any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Act, the Surety on this bond will pay the same to the extent hereinafter set forth. NOW, THEREFORE, we, the Principal and as Surety, are neia ana firmly bound unto the CITY OF VERNON in the penal sum of DOLLARS ($ ), lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents. THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his subcontractors, heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions, provender or other supplies or teams used in, upon, for or about the performance of the work contracted to be done, or for work or labor thereon of any kind, or fail to pay any of the persons named in California Civil Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor performed by any such claimant, or for any amounts required to be deducted, withheld, and paid over to the Franchise Tax Board from the wages of employees of the Contractor and his subcontractors pursuant to Section 18663 of the Revenue and Taxation Code with respect to such work and labor, and all other applicable laws of the State of California and rules and regulations of its agencies, then said Surety will pay the same in or to an amount not exceeding the amount hereinabove set forth, and also will pay, in case suit is brought upon this bond, such reasonable attorneys: fees as shall be fixed by the court, pursuant to Section 3181 of the California - D-5 - Civil Code. Labor and Material Bond - 1 This bond shall inure to the benefit of any of the persons named in Section 3181 of the California Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond, and the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract, or the work to be performed thereunder, or the specifications accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration, or addition to the terms of the Contract, or to the work or to the specifications. IN WITNESS WHEREOF, three (3) identical counterparts of this instrument each of which shall for all purposes be deemed an original thereof, have been duly executed by the Principal and Surety above named on the day of 2003. (Attach Acknowledgment) APPROVED AS TO FORM: Name By Name By EDUARDO OLIVO, City Attorney (Principal) ( Surety) (Attorney -in -fact) - D-6 - Labor and Material Bond - 2 CONTRACTOR'S ACKNOWLEDGEMENT OF INSURANCE REQUIREMENTS The Contractor acknowledges that the Insurance Schedule contained herein has been reviewed, that a copy thereof has been submitted to an authorized insurance agent or broker, and that the proof of insurance required therein will be submitted within thirty (30) days after notification of the acceptance of the Contractor's proposal. The Contractor understands that the Contract will not be executed by the City of Vernon until all proof of insurance have been received and approved as to form by the City Attorney. The Contractor agrees that failure to submit the required proof of insurance within said thirty (30) days shall constitute grounds at the City's discretion for awarding the Contract to the next lowest Contractor and for forfeiting the Contractor's bid bond. Date: Contractor Title: - D-7 - INSURANCE SCHEDULE (CONTRACTOR) The Contractor shall provide proof of insurance, including a standard certificate of insurance, in at least the following amounts and coverage (combined single limit permitted): I. Coverage and Limits Bodily Injury Property Damage Hazards Each Person Each Accident Each Accident Automobile Liability Owned Automobiles $ 500,000 $1,000,000 $ 500,000 Hired Automobiles $ 500,000 $1,000,000 $ 500,000 Non -Owned Automobiles $ 500,000 $1,000,000 $ 500,000 Workers' Compensation $ Statutory Employers' Liability $1,000,000 per employer II. General Liability Premises Operations $1,000,000 $2,000,000 $1,000,000 Elevators (if applicable) $1,000,000 $2,000,000 $1,000,000 Independent Contractors $1,000,000 $2,000,000 $1,000,000 Products - Completed_ Operations $1,000,000 $2,000,000 $1,000,000 Contractual Liability $1,000,000 $2,000,000 $1,000,000 Umbrella Liability $1,000,000 $1,000,000 $1,000,000 a. The general liability policy shall contain the following special endorsements that shall be noted on or attached to the standard certificate of insurance: 1. An endorsement naming the City of Vernon, its officers, and employees as insureds under the policy. 2. An endorsement providing the City of Vernon thirty (30) days notice of cancellation or material reduction of coverage. 3. An endorsement providing coverage for all operations under the City of Vernon Contract for this project. 4. Such other endorsement as may be required by addendum hereto. b. In addition to the standard certificate of insurance, proof of general and umbrella liability coverage shall be furnished in the form checked below. X For each policy, a notarized letter from the underwriter or carrier certifying that the coverage and statements in the standard certificate of insurance (attached thereto) - D-8 - are true and correct and that the signator is an officer authorized to so certify. A copy of each policy certified by an officer of the underwriter or carrier and notarized. PROOF OF INSURANCE APPROVAL AS TO FORM Proof of the following insurance coverage has been received and approved as to form: (1) Contractual Liability. (2) Automobile Liability. (3) Worker's Compensation. (4) Employer's Liability. (5) General Liability. (6) Umbrella Liability. Dated: EDUARDO OLIVO City Attorney - D-9 - - D-10 - INSURANCE FORM LETTER (To be issued on insurance carrier letterhead) Date: City Clerk City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 S A M P L E Re: Insurance for City of Vernon (description of permit or Contract) Policy Number(s) Named Insured: City Clerk: I hereby certify that the certificate of insurance attached hereto and made a part hereof by reference truly and accurately represents the above cited insurance policies and the insurance coverage of each for the named insured issued by (insurance carrier). The City of Vernon, its officers, and employees are included in said policies as additional insureds and the City of Vernon will be provided with thirty (30) days written notice of cancellation or material reduction of coverage. I certify that I am an officer of the insurance carrier named herein and that I am authorized to sign this certificate on behalf of said insurance carrier. (Notary) Signature Title - D-11 - bank or savings and loan certificates of deposit. - 0-13 - SPECIAL PROVISIONS E. SPECIAL PROVISIONS CONTRACT F02003 - PHASE V 1.1 Standard Specifications For the purpose of this Contract, all materials shall be in accordance with these specifications and the Standard General Conditions of the Construction Contract (hereinafter called Standard Specifications). Section numbers cited herein refer to these Standard Specifications. 1.2 Examination of Site The Contractor must visit the work sites to become familiar with and satisfy the Contractor as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the work. Contractor must promptly notify the City of all conflicts, errors, ambiguities or discrepancies which Contractor has discovered in or between the Contract Documents and such other related documents. 1.3 Existing Utilities and Soil Conditions The City maintains drawings of existing utilities showing plan and profile views of the installation of various conditions in the City right-of-way. Plans for job sites requiring trenching or digging for an anchor will be available to the Contractor for identifying any existing facilities. The Contractor shall notify USA Dig Alert 72 hours prior to start of any excavation. 1.3.1 Soil Boring Logs. Prior to entering into this Contract, the Contractor must investigate the soil conditions in the project area by referring to maps, plans, drawings and soil boring logs on and off site as maintained by the City. All such information is available to the Contractor upon request. 1.3.2 Substructure and Utilities. The Contractor shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. If no pay item is provided -E-1- SPECIAL PROVISIONS in the Contract for this work, full compensation for such work shall be considered as included in the prices bid for other items of work. All crossings of underground structures, utility mains and laterals as indicated on the plans shall be potholed by Contractor prior to the beginning of the work. Elevations shall be verified and water laterals shall be relocated by the City of Vernon Water Department as necessary. The costs of furnishing necessary potholes, and cutting and plugging abandoned interfering pipes during the construction must be included in the other bid items; no extra compensation will be paid to the Contractor for items related to potholing, cutting and plugging abandoned pipes. 1.4 Unit Prices All other costs not covered by specific unit prices but required for a complete job shall be included in the items most related to the work. Any adjustments to the unit prices to be paid to the Contractor are identified in Schedule D, Optional Task Pricing Form. The Contractor shall provide the City with progress billing, identifying unit quantities and Unit Prices as set forth in Schedules A, C and D. 1.5 Traffic Control The Contractor shall provide all traffic signs. All signs, lights, warning devices, as well as temporary lane markings used, shall comply with the State of California, Business, Transportation and Housing Agency, Department of Transportation "Manual of Traffic Controls for Construction and Maintenance Work Zones." All barricades used shall be equipped with a flasher. The Contractor shall maintain a minimum of one lane of traffic in each direction through work area at all times. 1.6 Building Entries The Contractor shall install fiber cable, via the existing conduit system, into the buildings. The Contractor 0i51wm SPECIAL PROVISIONS shall install appropriate inner ducts from the riser into the building termination points. The Contractor shall furnish and install secured rigid pathway inside the buildings from building entry to the demarcation point where the patch panel will be located. Buildings requiring special pathways to the patch panel include Washington Sump, Downey Sump and Well No. 20. 1.7 Coordination The Contractor shall notify the City Representative 48 hours in advance of any entry into a manhole/vault. The City Representative will assign qualified personnel to monitor Contractor working in the proximity of high voltage lines and equipment. The Contractor shall provide the City with as -built drawings prior to any milestone payment. Work will not commence until the Contractor has all equipment and material in his possession. The Contractor shall address all correspondence, equipment shop drawings, fiber cable factory test reports, pre -installation cable tests, as -built drawing, maintenance and installation manuals to the City s follows: Ali R. Nour City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 The Contractor shall identify a representative who will act as Project Manager. The Project Manager will be responsible for all daily crew activities and would be available to respond to any questions that may arise during the construction period. 1.8 As -built Drawings The Contractor shall provide the City with as -built drawings for the following three milestones: 1.8.1 After the placement of strand. The as -built drawings shall depict the length of the strand; number of cable arms, extension arms and guard arms, down guys, anchors and any other hardware related to the placement of messenger strand. With this as -built set of -E-3- SPECIAL PROVISIONS drawings, the Contractor shall furnish all information related to the pole height attachments. 1.8.2 After the placement of fiber optic cable, the Contractor shall furnish another set of as - built drawings confirming the locations of slack loops and splice enclosure cable slacks. 1.8.3 After the completion of all work and before submitting request for the final payment. The Contractor shall furnish a final as -built set showing all the information above with any changes and modifications to the original installation. 1.9 Schedule and Progress Reports The Contractor shall provide the City with a proposed project schedule for City's approval prior to the start of the construction. The Contractor shall provide the City bi-weekly progress report outlining completed and remaining work. 1.10 Optional Task The Contractor shall furnish all material and labor to install and connect other buildings to the City's fiber optic network. All material shall consist of cable, attachment hardware, demarcation point hardware such as splicing enclosures, patch panels and patch cord, risers, conduits and all other parts required to complete the connection, pursuant to the Unit Pricing established in this Contract. 2.1 Splice Enclosures Splice Enclosures shall meet Bellcore Testing Requirement GR-711-CORE. The Contractor shall furnish and install Preformed Line Products (PLP)Coyote closures. Standard 22" long and 8.5" in diameter Coyote enclosures shall be placed for loose buffer tube fiber optic cable. The enclosures shall be for aerial and underground use and the enclosures shall be furnished with six port three section end plates, one blank end plate and express storage compartment kit. 2.2 Patch Panels -E-4- SPECIAL PROVISIONS The Contractor shall furnish and install heavy duty, rugged, fiber optic distribution enclosures at all locations identified in Schedule C of the Contract Pricing Form. The wall -mount patch panels shall be installed in City remote facilities, inside the building and almost all inside a NEMA-3 communications cabinet. The connector panels shall be standard single mode fiber SC type. The patch panels shall have fiber slack storage, splice tray storage if applicable, gasketed cable entry, top and bottom cable entry ports and key locking mechanism on the double metal doors. The Contractor shall provide adequate identifying markings on all ports that fiber is terminated and connectorized. 2.3 Patch Cords The patch cords shall conform to published connector/cable specifications. The single mode patch cords shall be duplex cable assembled and produced using 9/125 um fiber and ceramic ferruled connectors. The patch cord connectors shall SC -SC or SC-ST as described in Schedule B of the Contract Pricing Form. The connector utilized in this project shall be high -density SC modules. The associated losses for these connectors shall be under 0.5 dB. All patch panels required under this contract shall be 12 ports. 2.4 Terminations at Leonis Substation The Contractor shall connectorize and terminate an additional 24 strands of existing fiber at the existing patch panel. Currently, the existing 72 port patch panel only has its 48 ports populated. The Contractor shall terminate fiber strands 49 through 72 at the remaining 24 available ports. 2.5 Terminations at Fire Station No. 1 The Contractor shall connectorize and terminate 48 stands of existing fiber at two 24 port patch panels a Fire Station No. 1. Fiber strands 1 through 24 shall be terminated in one existing 24 port patch panel and fiber 73 through 96 shall be terminated in the other existing 24 port patch panel. 3.0 Aerial Line Construction The Contractor shall build strand and place fiber optic cable at the following location routes, as shown on Project Map Appendix "A": -E-5- SPECIAL PROVISIONS 9 57thStreet between Alameda Street and Santa Fe Avenue, • 51st Street, between Alameda and Well No. 18, • Alameda Avenue between 57th Street and 38th Street, • Vernon Avenue between Alameda Avenue and Santa Fe Avenue, • 38th Street/Irving/37th Street, • Santa Fe Avenue between 37th Street and Vernon Avenue, • Vernon Avenue between Santa Fe Avenue and Alcoa Avenue, • Downey Road between Fruitland Avenue and 50th Street, • 50th Street between Downey Road and Alcoa Avenue, • 26th Street, Downey Overpass to Splice Enclosure No. 31, • Washington Boulevard Sump, • District Boulevard Well No. 20. 3.1 Fiber Optic Cable The Contractor shall install City furnished fiber optic cable. The cable shall be Pirelli Cable consisting of a 25,000 of 24-count single mode cable and 33,000'of 288-count single mode fiber cable delivered to the City Hall Warehouse on wooden reels. The Contractor shall be responsible for the safe keeping of the fiber optic cable starting from the time the City delivers the reels to the Contractor up till and including the complete commissioning of the system. The Contractor must be aware of the cable's minimum bend radius and pulling tension during installation. The minimum bending radius, as specified by the manufacturer, for loaded conditions, and unloaded conditions must not be exceeded. Maximum pulling tensions during installation are specified by the manufacturer and should not be exceeded at any time. The cable must be installed using the minimum possible tension. For permanent installed cable conditions, the tensile load on the cable shall be kept to a minimum, well below manufacturer's specification for tensile load in a permanent installation 3.2 Fiber Optic Pre -installation Test At the time of delivery, the cable manufacturer's representative will be present to visually inspect the condition of the delivered cable. The Contractor shall be present to visually inspect and verify the condition of the -E-6- SPECIAL PROVISIONS delivered cable for any damages during shipping. The Contractor shall immediately notify the manufacturer representative, shipper and the City of any anomalies or other conditions not meeting specifications. The Contractor shall test all three reels in one direction at 1550 nm uni-directionally and losses shall not exceed 0.3 dB/km. The Contractor shall provide the City with documented. test results in electronic format and a hard copy within three days from the delivery date. The Acceptance Test. This test will be performed after the entire fiber optic system has been completely installed and ready for commissioning. It shall provide the final commissioning data for engineering acceptance and archive data. The cable shall be tested with an Optical Domain Reflectometer (OTDR) and power meter test at dual wave length of 1310 nm and 1550 nm on any applicable end -to -end points and test reports shall be provided to the City in hardcopy on City furnished Cable Testing Logs. 3.3 Pole Attachments The Contractor shall attach the fiber optic cable and associated attachment hardware to the existing City owned distribution pole within communication space. Street crossing and railroad crossings shall comply with California Public Utilities Commission General Order 95 minimum requirements. In general, the proposed fiber optic cable shall be installed at a minimum depth of one and a half feet above telephone lines. Portions of this project line construction consist of overlashing the existing fiber optic cable plant. The Contractor shall remove any existing loose overlash wire prior to placing new fiber optic cable on the route. 3.4 Aerial Slack Loops The Contractor shall furnish and install aerial slack loops pursuant to the Make Ready Plans and instructions. The location of slack loops as shown on plans can only be adjusted only with City Representative's approval. All slack loops shall be installed and the Contractor shall not eliminate without the City's approval. The City plans to use certain aerial slack loops for future splice enclosures. The "figure 8" snow shoes shall be neatly installed at both ends of slack loops. 3.5 Riser Details -E-7- SPECIAL PROVISIONS The Contractor shall install the entire vertical riser the same size as the sweep rising from the ground without placement of any reducers. The proposed risers shall either be 4" conduit or 2" conduits. The vertical risers above ground and on the body of the power pole shall be schedule 80, Polyvinyl Chloride (PVC) conduit. On poles, supporting communication and supply conductors, vertical runs, risers, ground wire, guys and hardware, where practicable shall be a minimum of 1-1/2 inches apart. The PVC and other protective coverings shall be installed in a workmanlike manner. The methods used are subject to the approval of the City and should not conflict with the requirements of G.O. 95 Rule 84.6-E. The PVC couplings are to be cemented to PVC conduit at top socket of couplings. The lower socket of all couplings are not to be cemented to allow for expansion and contraction of conduit. 3.6 Cable Identification Requirements The Contractor shall identify the fiber optic cable at every underground access point, on every aerial splice casing,,and at all pole attachments. Tags shall be attached securely. Each cable identification tag will provide the following information: City Identification - Each identification shall indicate that the cable is the property of City of Vernon. Each identification shall provide a laser light hazard indication in accordance with approved Federal and State standards. 3.7 Approved Manufacturers Siecor AMP Netconnect Superior Modular Products Fibertron Pirelli Cables and Systems Alcatel Preformed Line Products (PLP)