Resolution No. 94421 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 9442 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING CONTRACT NO. 602, DEMOLITION OF CITY OWNED BUILDINGS AND STRUCTURES LOCATED AT 5119 DISTRICT BOULEVARD; ACCEPTING THE BID OF US DEMOLITION, INC. FOR THE DEMOLITION OF CITY OWNED BUILDINGS AND STRUCTURES IN ACCORDANCE WITH CONTRACT NO. 602 OF THE CITY OF VERNON AND APPROVING THE EXECUTION OF SAID CONTRACT; MAKING CERTAIN FINDINGS RELATIVE TO THE PROPOSED PROJECT; AND APPROVING AND ADOPTING A NEGATIVE DECLARATION FOR THE PROPOSED PROJECT WHEREAS, the City of Vernon intends to demolish approximately 255,000 square feet of City -owned buildings and structures which Ilinclude the slab and footings at property located at 5119 District Boulevard, which site was previously operated as an industrial facility with loading facilities, in preparation for a new development (the "Proposed Project"); and WHEREAS, the Proposed Project is subject to the California Environmental Quality Act ("CEQA") because it requires discretionary approval; and WHEREAS, there has been presented to the City Council of the City of Vernon Contract No. 602 for Demolition of City Owned Buildings and Structures Located at 5119 District Boulevard; and WHEREAS, the Director of Community Services & Water sent the proposal for Contract No. 602 to eight contractors and three proposals were received by September 19, 2007; and WHEREAS, said proposals were referred to Samuel Kevin Wilson, Director of Community Services & Water, who has reported to the City under the date of October 3, 2007, recommending that Contract No. 602 for the Demolition of City Owned Buildings and Structures 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 11located at 5119 District Boulevard be executed with US Demolition, Inc. on the basis of its bid in the sum of Three Hundred Thirty -Seven Thousand Nine Hundred Sixty -Five Dollars and No cents ($337,965.00), being the lowest responsible bid meeting the contract requirements; I I and WHEREAS, the Director of Community Services & Water has performed an Initial Study dated September 25, 2007, to determine whether the Proposed Project will have adverse impacts on the environment and has determined that the Proposed Project could not have a significant effect on the environment, and the Director of Community Services & Water has recommended that a Negative Declaration be adopted in compliance with CEQA; and WHEREAS, the City of Vernon has provided notice of its lintent to adopt a Negative Declaration for the Proposed Project and has provided a public review period of not less than 20 days, as required by the State CEQA Guidelines; and WHEREAS, notice of a public hearing was posted on three official bulletin boards of the City of Vernon on September 25, 2007, was mailed to interested parties within 300 feet of the Proposed Project, and was mailed to interested parties that requested notice, as required by the State CEQA Guidelines; and WHEREAS, the City Council of the City of Vernon held a public hearing on the Proposed Project and the adoption of a Negative Declaration on October 15, 2007; and WHEREAS, the Director of Community Services & Water by his memo dated October 3, 2007, has indicated that the Proposed Project is consistent with the General Plan of the City of Vernon; and WHEREAS, in accordance with Section 711.4(c) of the Fish and - 2 - 10 11 12 13 14 15) 16 17 18 19 20 21 22 23 24 25 26 27 28 JGame Code, no evidence has been found that the Proposed Project will shave the potential for adverse effects on wildlife resources, and is therefore exempt from the fees otherwise payable under Section 711.4; Iand WHEREAS, the City Council has heard and considered all evidence, both written and oral, presented in consideration of the Proposed Project and the adoption of a Negative Declaration. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby Ifinds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon hereby finds that the Proposed Project is consistent with the General Plan and Zoning Ordinance of the City of Vernon. SECTION 3: The City Council of the City of Vernon hereby finds on the basis of the whole record before it (including any comments received) that there is no substantial evidence that the Proposed Project will have a significant effect on the environment individually or cumulatively, and that the Negative Declaration reflects the City of Vernon's independent judgment and analysis, on the basis of said findings the City Council hereby approves and adopts the Negative Declaration for the Proposed Project. SECTION 4: Pursuant to Section 711.4 (c) of the Fish and Game Code, the City has found no evidence that the Proposed Project will have the potential for adverse effects on wildlife resources and the Proposed Project is therefore exempt from the fees otherwise payable under Section 711.4. - 3 - 1 SECTION 5: The City Council of the City of Vernon hereby 2 approves the Environmental Checklist Form and Initial Study and 3 Negative Declaration dated on or about September 25, 2007, together 4 with any attachments thereto. Copies of said documents have been 5 submitted to the City Council concurrently herewith, and the City 6 Clerk is directed to receive and file them. Such documents and other 7 materials which constitute the record of proceedings in this matter 8 shall be maintained in the office of the City Clerk, who is and shall 9 be the custodian thereof. 10 SECTION 6: The City Council of the City of Vernon hereby 11 directs the City Clerk, or her designee, to file a Notice of 12 Determination in regard to the environmental impact of said Proposed 13 Project. 14 SECTION 7: The City Council of the City of Vernon hereby 15 authorizes the City Administrator, or his designee, to execute any and 16 all documents necessary to implement and carry out the purpose of this 17 Resolution. 18 SECTION 8: Contract No. 602 for the Demolition of City 19 Owned Buildings and Structures Located at 5119 District Boulevard is 20 hereby approved and accepted by the City Council of the City of 21 Vernon. 22 SECTION 9: The City Clerk of the City of Vernon is hereby 23 directed to file in the office at the City Hall of the City of Vernon 24 a copy of said contract. 25 SECTION 10: The City Council of the City of Vernon does 26 hereby award Contract No. 602 to US Demolition, Inc. in accordance 27 with the recommendation of Samuel Kevin Wilson, Director of Community 28 Services & Water, and authorizes the Mayor or Mayor Pro=Tem to execute 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 the Contract for, and on behalf of, the City of Vernon and the City Clerk is hereby authorized to attest thereto. SECTION 11: All others proposals or bids are rejected subject to execution of the Contract and the City Treasurer or Deputy City Treasurer is hereby directed to return unsuccessful bidders any cashier or certified checks deposited with said bids upon the receipt of an executed Contract from US Demolition, Inc. accompanied by all required bonds and certificates. SECTION 12: The -City Clerk of the City of Vernon shall certify to the passage of this resolution and thereupon and thereafter the same shall be in full force and effect. APPROVED AND ADOPTED this 6th day of November, 2007. ATTES MANUELA GIRON, C�ity% Clerk Name: Leonis'-�C. Mal urg Title: Mayor ®r Tvrar�pr^_m4, - 5 - 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, MANUELA GIRON, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 9442, was duly adopted by the City Council of the City of Vernon at an adjourned regular meeting of the City Council duly held on Tuesday, November 6, 2007, and thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. { MANUELA GIR N, City Clerk (SEAL) - 6 - CITY CLERK'S OFFICE INTER -OFFICE MEMORANDUM November 14, 2007 DATE: Services & Water T0: Samuel Kevin Wilson, Director of Community FROM Nelly Giron, City Clerk Council Resolution No. 9442 - A Resolution of the City 602, RE: of Vernon Approving Contract No. of the City d Structures Demolition of City Owned Building and the Bid Located at 5119 District o othevDemolition of City of US Demolition, Inc. of Vernon and Owned Buildings and Structures in Accordance with Approving Contract No. 602 of the City Making Certain the the Execution of Said he Proposed Project; and Findings Relative to Prop Negative Declaration for the Approving and Adopting a Proposed Project py of Resolution No. 9442, Transmitted herewio which was approved by City Council on November referenced above, 6, 2007. NG:dr c: Resolution No. 9442 Contract No. 602 CITY OF VERNON COMMUNITY SERVICES & WATER DEPARTMENT CONTRACT CHANGE ORDER NO. 8 SUPPLEMENT NO. SHEET 1 OF 1 SHEETS PROJECT: DEMOLITION OF CITY OWNED BUILDINGS & STRUCTURES AT P.O.N®. 011.00014 5119 DISTRICT BLVD. — CONTRACT 602 - RESOLUTION No. 9442 52 TO: U.S. DEMOLITION, INC. CONTRACTOR REQUESTED BY: CITY OF VERNON You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally inrinAaA in the rnntrnrt The City of Vernon hereby approves the following changes: Removal and reconstruction of 280 square feet of sidewalk damaged during demolition activities at 5119 District Blvd., part of Contract No. 602. Work to be completed by the City of Vernon -for a credit to the City. Cost for removal of existing damaged sidewalk: $ 576.28 Construction per City of Vernon Standards: $ 1,554.00 Total credit to the City $ 2,130.28 Contract Amount (Base Bid) .......................... ...............:......... $ 337,965.00 Amount of This Change Order $ (2,130.28) Amount of Previous Change Orders ......................................... $ 938,884.00 Total Change Orders ..................................................... $ 936,753.72 Modified Contract Amount .............................................. $ 1,274,718.72 By reason of this change order the time of 0 completion will be adjusted as follows: Approved: Date: 1Z - �i Director o Community Services & Water Date: /"�.9' Attest: Nlanuelg Giron, City Clerk We, the undersigned Conti -actor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted Date: Zs J �/" 1 aContractor: C l t i --h b✓1 I v► G . 5 L t /� �•�f By: Title: f c: Yrodect !rile/C;ontractor/Yurchastng nev. Volvo CITY OF VERNON COMMUNITY SERVICES & WATER DEPARTMENT CONTRACT CHANGE ORDER NO. 3 SUPPLEMENT NO. SHEET 1 OF 1 SHEETS PROJECT: DEMOLITION OF CITY OWNED BUILDINGS & STRUCTURES P.O. NO. 011.00001 AT 5119 DISTRICT BLVD. — CONTRACT 602 452 TO: US DEMOLITION, INC. CONTRACTOR REQUESTED BY: CITY OF VERNON You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally included in the contract. The site contains a previously unknown slab shown on the attached drawing approximately 118,000 sq. ft. in size, buried under a variable thickness'of soil averaging 2 feet in depth. The City of Vernon hereby approves the following changes: Uncover, remove, crush said slab and dock in accordance with contract specifications. Re -grade the soil to a level surface in accordance with NPDES requirements, spread the crushed material from the dock and slab in a uniform thickness on the surface of the soil. Work to. be done under time and material basis with a cost not to exceed $132,909.00. Cost shall be per attached Rate Schedule on the Change Order Request from dated 1/23/08. Please note that the spread crushed base was required to be compacted to 90% relative compaction. Therefore, the compaction effort is not a part of this change order. Contract Amount (Base Bid) ..... .... ....... ...... ... $ 337,965.00 Amount of This Change Order ....... ..... ....... ...... .... ... $ 132,909.00 Amount of Previous Change Orders ................... ..... ............. $ 5.649.00 Total Change Orders ................................................... .. .. $ 138,558.00 Modified Contract Amount ...... ..... ....... ......... $ 476,523.00 By reason of this change order the time of 14 d yS tension completion will be adjusted as follows: Approved: Z4r Date: Director of m4runity gerAces & Water We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment thereforethe prices shown above. Accepted Date: O/ &! '0O ontractor: s% 'le, By: !�J-S'. `P-e-W l! II WO►I li'1 C , Title: ✓1 er/ lor�cs,d-A"�- e;: rrujecL rueiwnLracwrirurcnasmg ---------- ----- ----- --- - - I, 14 LM �� y R i � +w R � I � 7 ` -- -iY--------------- ------------------ I� I I ------------ ------------------- + - _ V► I I I -- ----- b------------------ '. B ----------- ----------------- - N 41 II � � � •..•: � o .- - - - - - - - - ---------{ - a - O I R I i (� _ y r I R ------- -8R - N � -- --- -- ----- - �, v 1 O �� rr •rq R ---------�„-,--- ------ -- - -----------' - .._ ---_------ -_- __'_ ---�T ta ----------- W9. s Demolition 4510 E. Eisenhower Circle Anaheim CA 92807 Phone: (714) 695-9026 FAX: (714) 695-9024 Change Order Request U.S.D. C.O.R. M 03 U.S.D. Job # 5135 Customer Job #: 602 Ref #: To (Customer) City of Vernon Attention: Kevin Wilson Phone #: 323-583-8811 FAX M 323-826-1435 Job Name/Address: Demolition @ 5119 District Blvd. Vernon, CA As of submittal date, this scope of work is: ❑ Performer 0 Not Performed ❑ In Progress Description of Extra Work: A second slab has been discovered beneath the existing building slabs for a portion of the site. This area is roughly 118,830 SF in size and the slab in question is 6" thick. Please see attached mapping with the area outlined in blue. There is a layer of dirt between the slabs which will need to be moved off to access the concrete. (and then re -spread later) The concrete quantity is app. 2,128 CY or 4,256 tons. Time extension will be 14 days. Date/ FCO # Description Excavator Excavator Pulverizer Loader Rock Truck Labor Foreman 14 day duration Move dirt 12,000 CY Crush 4256 tons @ $3.00 Spread with remaining crushed material over site Rate Hours Total 235 80 $ 18,800 165 80 $ 13,200 55 35 $ 1,925 125 40 $ 5,000 50 470 $ 23,500 55 112 $ 6,160 2 12000 $ 24,000 4256 3 $ 12,768 4256 2 $ 8,512 Subtotal $ 113,865 Mark up 15% $ 17,080 Subtotal $ 130,945 Bond $ 1,964 Change Order Request Total: $ 132,909 Customer: By signing below, you authorize U.S. Demolition to proceed with the work described above at the amount listed and verify that you are authorized to do so. If the work has already been performed, or is in progress, your signature acknowledges that your company authorized U.S. Demolition to proceed with the work described above. Signature: Name: Title: Date: U.S. Demolition, Inc. Submitted By: Scott Moore Project Manager Submittal Date: 1/23/2008 5135COR03 US. Demolition EQUIPMENT HOURLY RATE MINIMUM CHARGE Flatsaw Gas to 8" depth 110.00 300.00 Propane to 8" depth 115.00 300.00 Electric or Hydraulic to 12" deep 125.00 300.00 Handsaw Gas to 7" depth 100.00 225.00 Gas 8" - 12" depth 110.00 225.00 Hydraulic 120.00 225.00 Wallsaw Air to 24" depth 120.00 275.00 Hydraulic to 24" depth 135.00 275.00 Plunge Saw 175.00 4 hours Wiresaw call for price Grinder 110.00 4 hours 2 Man Torch 140.00 4 hours Laborer 50.00 4 hours 853 Bobcat Loader 100.00 4 hours 853 Bobcat Backhoe 125.00 4 hours 853 Bobcat Dump Combo 125.00 4 hours 853 Bobcat Ram 150.00 4 hours 446B Cat Backhoe 110.00 4 hours 446B Cat Loader 110.00 4 hours 446B Cat Ram 175.00 4 hours 966 Wheel Loader 141.00 8 hours 973 Track Loader 165.00 8 hours 235/345/400 Excavator w/Backhoe 225.00 8 hours 235/345/400 Excavator w/Pulverizer 250.00 8 hours 235/345/400 Excavator w/Ram 285.00 8 hours 300B Excavator w/Pulverizer 250.00 8 hours 300B Excavator w/Backhoe 225.00 8 hours Crushing Plant (per ton) 3.00 General Superintendent 65.00 4 hours Foreman w/truck& tools 55.00 4 hours 10 wlr/semi end dump 88/99 4 hours Off Road Truck 125.00 4 hours Standby (except heavy equipment) 60.00 15% Overhead & Profit will be added to these rates. Dump fees are market rate plus 15% Other materials charged at market rate plus 15% A 'L ML AMAN Environmental Construction Demolition and Remediation Contractors 614 E. Edna Place Covina, CA 91723 Phone: 626-967-4287 FAX: 626-332-1877 January 29, 2008 City of Vernon — Community Services & Water Department 4305 Santa Fe Avenue Vernon, CA 90058 Attention: Samuel Kevin Wilson, Director Phone: 323-583-8811 Fax: 323-826-1435 Subject: Demolition of Buried Concrete Slab at Former Thermador Site Mr. Wilson: Aman Environmental Construction, Inc. (Aman) submits the following bid proposal for the above subject project: SCOPE OF WORK - Remove and stockpile on -site approximately V to 3' of soil from on top of existing buried slab - Demolish approximately 120,000 SF of 6-inch thick concrete slab on grade - Process concrete slab debris and crush to 3-inch minus to be used as structure backfill in accordance "Greenbook" Standard Specifications for Public Works Construction - Mix existing stockpiled soil with crushed concrete debris to backfill previously buried slab area - Backfilled slab areas will be level and graded to existing site contours TOTAL LUMP SUM PRICE: $143,825.00 Add Alternate — Cost of Payment & Performance Bond: $1,500.00 Proposal Conditions and Assumptions: o Buried concrete slab is assumed to be no greater than 6-inches thick and does not contain any moisture barrier waterproof membranes under the slab. o Removal of any below grade concrete foundations, besides concrete slab on grade, shall be performed at the direction of the City of Vernon on a Time -and -Material basis utilizing Aman's Equipment and Labor Rental Rate Sheet (attached). o Cost of Payment & Performance Bond is included in the lump sum price. o All items to be removed for reuse or salvaged for the City of Vernon shall be removed by others prior to demolition operations and Aman is not responsible for pre-existing conditions. o All utilities and piping shall be located, cut, capped, made safe and/or relocated, protected by others prior to start of demolition. o All live utilities to remain shall be clearly marked and brought to the attention of Aman prior to commence - Page 1 of 3 AMAN Environmental Construction Demolition and Remediation Contractors ment of demolition. o Unless otherwise noted in this proposal, all equipment, scrap and salvage shall become the property of Aman. o This proposal does not include the removal of any hidden subsurface construction (such as double slabs, footings or foundations) from previously demolished structures, not identified in the above scope of work. o This proposal is predicated on the assumption that the City of Vernon will schedule the work in a manner that provides a safe and reasonable work area and sufficient access/egress to allow for efficient debris removal. Proposal assumes contractor to have access to site 8-hours per day, 5-days per week. o No new work or temporary work shall be installed in an area where demolition is to take place that inhibits reasonable access or operations. o Project includes one (1) move-in(s). All additional mobilizations will be charged $3,500.00 each. Additional mobilizations for crusher equipment will be $4,000.00 each. o Aman shall complete all work within four (4) weeks after a written Notice -To -Proceed from the City of Vernon; the current schedule is based on working five (5) days per week (see attached preliminary schedule). o Aman will procure City of Vernon Demolition Permit and SCAQMD Notification for Demolition. Any other permits or fees are excluded. Demolition permit will be no -fee. o In the event of a dispute, the method of remedy will be to submit the matter to arbitration in accordance with the rules of the American Arbitration Association. The prevailing party shall be entitled to reasonable attorney fees associated with the dispute. o Where a Claim is the result of the joint or concurrent negligence, the duty of indemnification and defense shall be in proportion to the indemnifying parties' share of such joint or concurring negligence. o Work beyond the scope of work as detailed herein shall be completed on a Time and Materials basis in accordance with Aman Equipment and Labor Rental Rate Sheet. Qualifications: o This proposal, including all conditions, qualifications, additive/deductive alternates, and exclusions shall become apart of any agreement. o Aman reserves the right to withdraw or modify this proposal if not accepted in writing within 30-days and no work shall start until a Contract Agreement is properly executed, with mutually agreeable language, terms, conditions and schedule. o Retention shall be no greater than 10% and be released / paid within 35-days of completion of our work. o Proposal is based on non -union, non -prevailing wage rates to perform this work. o Cost of Payment & Performance Bond is included in the base bid. Exclusions: o Permits (Cost of),unless specifically identified in scope of work o Locate, cut, cap or purge utilities/ piping / tanks/ vessels o Salvage for others o Preparation of old surfaces for new finishes o Layout o Engineering / Testing / Inspection o Import/Export of Soil or Engineered Fill o Topsoil and/or fine grading o Work for M.E.P. Trades o Replacement of existing improvements Page 2 of 3 AMAN Environmental Construction Demolition and Remediation Contractors o SWPPP / Erosion Control / De -watering o Dust and/or Noise Partitions o Bushing / Sandblasting / Roughen Surfaces o Grinding or patching of surfaces to remain o Handling or removal of hazardous/toxic/regulated materials o Removal of underground piping, conduit, or utilities o Pest Control o Removal of sand or sub -base material o Removal of footings, piles or caissons o Removal of City of Vernon or other utility company equipment or property , o Repairs to existing fence damaged by others o Pedestrian canopy or walk covers o Site Security o Certified Compaction / Soils Engineer If you have any questions or require additional information, please contact me at (626) 967-4287, extension 3004, Sincerely, Aman Environmental Construction, Inc. Brian S. Laurin Vice President Page 3 of 3 AMAN Enviroa mental construction - 1)en%hr;arr �� �tei�retioYet±er� Connors BARE MAINTAINED EQUIPMENT EXCAVATORS 170,000-185,000# Excavator/Hydraulic Beaker 170,000-185,000# Excavator/Bucket 130,000-150,000# Excavator/Beaker 130,000-150,000# Excavator/Hydraulic Shear 130,000-150,000# Excavator/Concrete Pulverizer 130,000-150,000# Excavator//Grapple 130,000-150,000# Excavator/Bucket 90,000-110,000 # Excavator/Breaker 90,000-110,000 # Excavator/Hydraulic Shear 90,000-110,000 # Excavator/Concrete Pulverizer 90,000-110,b00 # Excavator/Grapple 90,000-110,000 # Excavator/Bucket 65,000-75,000 # Excavator/Breaker 65,000-75,000 # Excavator/Hydraulic Shear 65,000-75,000 # Excavator/Grapple 65,000-75,000 # Excavator/Bucket Mobilization (Excavator) mobilization+demobilization LOADERS Rubber Tire Backhoe/Loader 14' depth Rubber Tire Backhoe/Loader 17' depth Rubber Tire Backhoe/Loader 14' depth/Breaker Rubber Tire Backhoe/Loader 17' depth/Breaker *** Additional attatchments available upon request Mobilization (Loader/Backhoe) Rubber Tire Loader 7cy Rubber Tire Loader 6cy Rubber Tire Loader 5cy Rubber Tire Loader 4cy Track Loader 3.4 cy Track Loader 2.25 cy Track Loader 2.20 cy Track Loader 1.25 cy mobilization+demobilization Mobilization (Loader) mobilization+demobilization DAILY RATES $3,640 DAY $2,240 DAY $2,240 DAY $2,240 DAY $1,640 DAY $1,640 DAY $1,240 DAY $1,960 DAY $1,960 DAY $1,440 DAY $1,200 DAY $1,080 DAY $1,760 DAY $960 DAY $840 DAY $1,400 EA $400 DAY $480 DAY $960 DAY $1,120 DAY $600 EA $960 DAY $840 DAY $720 DAY $600 DAY $1,040 DAY $840 DAY $600 DAY $520 DAY $1,000 DAY *** ALL BARE EQUIPMENT WILL BE CHARGED AT THE DAILY RATE + MOBILIZATION ON THE 1ST DAY *** ALL EQUIPMENT/MATERIALS/MOBILIZATION/DEMOBILIZATION WILL BE BILLED RATES PLUS 15% MARK UP*** *** ALL LABOR WILL BE BILLED RATES PLUS 15% MARK UP*** AA' AMAN Environnwltal Conswetion � Dw-w11T m &d Renwdavap Ujnkaaors BARE MAINTAINED EQUIPMENT Bobcat 873 Skid Steer Loader/Hydraulic Breaker Bobcat 873 Skid Steer Loader/Hydraulic Shear Bobcat 873 Skid Steer Loader/Grapple Skid Steer Loader/Bucket DIAMOND EQUIPMENT Diamond Flatsaw (1 "-8" Depth) Diamond Coredriller ( 1" - 12" Dia. ) Diamond Wallsaw (1 "-12" Depth) TRUCK CRANES 75 Ton Truck Crane 100 Ton Truck Crane 125 Ton Truck Crane 150 Ton Truck Crane 180 Ton Truck Crane 250 Ton Truck Crane HYDRAULIC CRANES 14.5 Ton 40 Ton 60 Ton 70 Ton 80 Ton 90 Ton 100 Ton 120 Ton TRUCKS 2000 Gallon Water Truck 3500 Gallon Water Truck Truck 3/4 Ton Truck 1/2 Ton Fuel truck 1 Ton Job Cart / Gator ROUGH TERRAIN CRANES 70-75 ton rough terrain crane 50-55 ton rough terrain crane 30-55 ton rough terrain crane 25 ton rough terrain crane DAILY RATES $640 DAY $640 DAY $320 DAY $280 DAY $680 DAY $720 DAY $760 DAY $1,600 DAY $1,800 DAY $1,880 DAY $1,960 DAY $2,200 DAY $2,800 DAY $880 DAY $960 DAY $1,800 DAY $1,880 DAY $2,120 DAY $2,280 DAY $2,400 DAY $2,720 DAY $270 DAY $500 DAY $80 DAY $70 DAY $100 DAY $55 DAY $1,700 DAY $1,035 DAY $845 DAY $600 DAY *** ALL BARE EQUIPMENT WILL BE CHARGED AT THE DAILY RATE + MOBILIZATION ON THE 1ST DAY *** ALL EQUIPMENT/MATERIALS/MOBILIZATION/DEMOBILIZATION WILL BE BILLED RATES PLUS 15% MARK UP* *** ALL LABOR WILL BE BILLED RATES PLUS 15% MARK UP*** AMAN Environmental Construebon I� r "4 6 a&-- Rewaatwvr Corwau vs AERIAL EQUIPMENT 40' Boom Lift 60' Boom Lift 80' Boom Lift 110' Boom Lift 15' Scissor Lift 20' Scissors Lift 33' Scissors Lift FORKLIFTS & COMPACTION DRUMS 5000# Forklift 8000# Forklift 10000# Forklift ELECTRICAL EQUIPMENT Light Tower 10 k.v.w. Generator Plasma Cutter MISCELLANEOUS Two Way Radios Air Compressor 185 cfm Air Compressor 250 cfm Compressor 375 cfm Compressor $235 DAY $340 DAY $760 DAY $1,100 DAY $80 DAY $88 DAY $175 DAY $115 DAY $200 DAY $235 DAY $100 DAY $86 DAY $150 DAY $15 DAY $150 DAY $100 DAY $140 DAY $160 DAY *** ALL BARE EQUIPMENT WILL BE CHARGED AT THE DAILY RATE + MOBILIZATION ON THE 1ST DAY *** ALL EQUIPMENT/MATERIALS/MOBILIZATIONIDEMOBILIZATION WILL BE BILLED RATES PLUS 15% MARK UP*** *** ALL LABOR WILL BE BILLED RATES PLUS 16% MARK UP*** 'Adsk s AMAN Environnmial Consinwction = Renj QkYxm CQrlf/doatS LOADERS Skip Loader 60-75hp/4WD/DSL D4 Dozer D6 Dozer D8 Dozer TRUCKS Articulate Truck 30 T Articulate Truck 35 T Mobilization (Articulate Truck) WHEEL TRACTOR SCRAPPERS 623 Scrapper 637 Scrapper Mobilization (Scrapper) MOTOR GRADERS Motor Grader (CAT 12H) Motor Grader (CAT 140H) Mobilization (Motor Grader) Aero-stomper Mobilization (Aero-stomper) Tractor w/ 2,000 Impactor Mobilization (Tractor w/ 2,000 Impactor) mobilization+demobilization mobilization+demobilization mobil ization+demobilization mobilization+demobilization mobilization+demobilization $220 DAY $660 DAY $1,100 DAY $1,900 DAY $1,040 DAY $1,120 DAY $2,000 EA $1,200 DAY $1,920 DAY $2,500 EA $800 DAY $840 DAY $1,000 EA $1,120 DAY $600 EA $1,720 DAY $1,000 EA *" ALL BARE EQUIPMENT WILL BE CHARGED AT THE DAILY RATE + MOBILIZATION ON THE 1ST DAY ** ALL EQUIPMENT/MATERIALS/MOBILIZATION/DEMOBILIZATION WILL BE BILLED RATES PLUS 16% MARK UP*** *** ALL LABOR WILL BE BILLED RATES PLUS 16% MARK UP*",* A! .AN Envirorimnio Construction l r+lrl ima wd fdGr3FBCAaw Carlffadm LABOR RATES HOURLY RATE Labor / Truck $53 HR Labor / Torch $53 HR Labor ST $45 HR Labor OT (add) $16 HR Labor DT (add) $30 HR Operator ST $60 HR Operator OT (add) $20 HR Operator DT (add) $35 HR Project Manager $75 HR Superintendent $75 HR General Foreman $65 HR Foreman $55 HR Safety Engineer $65 HR Site Secretary/TimeKeeper $30 HR Per Diem Meals & Incidentals $34 HR Per Diem Meals, Incidentals & Lodging $80 HR Travel Time $65 HR Asbestos Foreman $69 HR Asbestos Labor $64 HR PPE Level A / Man / Shift Level B / Man / Shift Level C / Man / Shift Level D / Man / Shift ** Does not include oxygen ** Does not include oxygen $150 HR $80 HR $40 HR $0 HR -ALL BARE EQUIPMENT WILL BE CHARGED AT THE DAILY RATE + MOBILIZATION ON THE 1ST DAY * ALL EQUIPMENT/MATERIALS/MOBILIZATION/DEMOBILIZATION WILL BE BILLED RATES PLUS 15% MARK UP*** * ALL LABOR WILL BE BILLED RATES PLUS 15% MARK UP*** Page 1 of 1 Wilson, Kevin From: Dan_Ngo@URSCorp.com Sent: Tuesday, January 29, 2008 3:49 PM To: Wilson, Kevin Subject: RE: Proposal for Demolition former Thermador site Importance: High Attachments: Bid Proposal - City of Vernon 20080129.pdf Hi Kevin: Attached is the cost proposal for removal of the buried concrete slab at the former Thermador site in Vernon. The earthwork price came in substantially lower than my plug price. Also, I separated the bond cost from the lump sum price. The existing contractor has a slight advantage since they already have most of their equipment on -site. Anyway, I appreciate you giving us the opportunity to provide a cost proposal; please contact me for any upcoming demolition or remediation projects you may have. Sincerely, Dan Ngo Cleveland Wrecking Company 628 E. Edna Place Covina, CA 91723 626-967-9799 phone 626-967-1479 fax (See attached file: Bid Proposal - City of Vernon 20080129.pdfi This e-mail and any attachments are confidential. If you receive this message in error or are not the intended recipient, you should not retain, distribute, disclose or use any of this information and you should destroy the e-mail and any attachments or copies. r 1/31/2008 C' FA :4 L r % V I_ 4 n M ■ N 7 i MARCOR Remedletlon, Inc. 16027 Carmenits Rd. Cerritos, CA 90703 800-237-5271 Fiiix 562-921-2383 FAX COVER SHEET Please Deliver The Forthcoming Pages To: Name: Fax Machine Number: From: Date: — l _� 1'tsnamlealon inciudee — Pogo (a) - Including this com shb*L If you do not race" ell the pa es Indicated above plaaeo call (6132) 921. 733. 7'f**f ffff"R1lRIMwi4lrw AMMR IRRRYIflf�kfYF t4yA1Fw ■kNki Nfiffxfxffxfffs*fA41i VAii **kkRNNNNNNNRR R7lkal*wRlkR11RRRRlISH1A**i*7FAk7rAek•**k kkrki 4RGbR ReMedWYh,% !na olfisra st"narhnnkay-anvlmnmen&1 wntr w&V servlcaw mdth.a caampAgre mve ofaay► aw for OrlyA&V pircyfectaifih ea- AJ' �"'� ♦ � r. 'i r. 'tip r _: �. ...�,.:�>Ji J� is .■■■■■■■■■err■rr■r■r'■■■■■■■■s■■r■■r.r..■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■.ri.FPll rl Comments and/or Spada] Instructions: "'Confidentiality Notice—" The documents accompanying this telecopy transmisalon Contain Confldentlal InformaWn belonging to the sender, whlCh Is legally privileged. The Information is Intended only for the use of the Individual or entity named above. If ybu are not the Intended recipient you Are hereby..notiiled that any disclosures, copying distribution orthe taking of any action in reliance an the contents of this telecopiad information Is strictly prohibited, If you have received this talecapy in error, please Immediately notify us by the telephone to arrange for the return of original documents to us. Amnnta, GAi Baltimore, MD" Boston, hw Corrltos, CA* Norfolk, VAN Philadatphia, PA' Rochester, NY* Sallsbury, MDf • 01.11511h, CA T'd EBEz-TZ6-Z95 'OWI`WOIldIQ3W3H M00NUW Wdfr2r13 BOOZ TE Uer Wip WCE,pAc,� C alc%a'frK MARCOR Remedlailion, Ino. 14027 Cormenita Road Cerritos, CA 90703-2208 be P7366B 1 k Y 40n2 C /A_ , 1 IV" January 30, 2008 1-323-820 -1435 Mr. )Gavin Wileorn Clty of Vernon 4309 Santa Fe Avenue Vernon, CA. 9DOSS RE: Demolition Proposal Asphalt and Concrete Crushing A %ntic Avenue and District Blvd, City of Vernon MARCOR Proposal* 108.081 Dear Mr, Wilson: MARCOR Remodiation, Inc. (MARCOR) le pleased to present our proposal for Demolition at the above referenced location. Our proposal has been prepared In accordance with the bid package prepared by Verbal Instructions. A walk through of the site to verify scope of work and e)dsting conditions was conducted on 1/30108. MARCOR's proposal is based upon the Information provided, SCOPE OF WORK The Scope of Work includes: Removal of 13,112 cubic yards of dirt off of secondary asphalt and concroto pad, Removal and crushing on slte of 3000 cubic yards of secondary concrete and asphalt paid discovered during initial demolition by others. Redistribution of 13112 cubic yards of removed dirt across area of initial removal, compaction by track loader, spreading of crushed asphalt and concrete base materiel, genoratedfram chushing of removed asphalt and concrete pad, and rough grading at completion, price includes all mobIllzatlon of equipment, labor, materials, Inaurance and fees required to complete the scope of -work. M013IL17-ATION PROCEDURES lAgbl Ilzatlon: Mobilization will commence upon recelpt of acceptance to this proposal or issuance of Notice to Proceed. Anencv Notilicatlon' The regulatory notification includes submission of properly executed notification forms and fees to applicable agencies. Typically, 10 working days notification is required. Staging of Supplies and Waste Dumgster Suppllss will be staged in a neat and orderly manner and will be coordinated with the dasignated Owner's Representative. Dumpster will be located $9 close as possible to the designated waste egress, and coordinated with the Owner's Representative, 562-921-2733 Z62.921.23133 JFAX) 900-237.6271 www.mamor.com AssE5T05 - LEAD - MOLD - PCBs - TANKS - HAZWASTE . COATINGS - SOIL - GROUNDWATER . DECOMMISSIONING ■ DEMO - DISASTERS 2-cl 6862-126-299 '3WI`W0IlidIQ3W3N NO3NUW Wd-bi?;6 8002 TE uer EWAI�a N V IO N M 1 N 7 L SCHEDULE Work will proceed 10 working days following submission of notification to regulatory agencies. Work will be substantially complete within approximately 20 working days, A detailed schedule, showing task sequence and critical dates will be submitted upon request, HEALTH AND SAFETY: MARCOR employe a full time Director of Health and safety, who Is responsible for developing, implementing and enforcing our quality assurance program, GOVERNING REGULATIONS: All work performed by MARCOR Remedlotion, Inc„ will be In accordance with written procedures, and all applicable laws, rule* and regulations. In conducting our research, we have collaborated with governmental regulatory agencies, Including The U.S. Environmental Protection Agency (USEPA), the U.S. Occupational Safety and Health Administration (OSHA), the State of California Department of Health Servleats (DOHS), the California Department of Industrial Relations Division of Ocoupatlonel Safety and Health (CaVOSHA), and the National Institute of Occupational Safety and Health (NIOSH). Our work procedures are planned, documented and performed in compliance with the following regulations and specifications; Cedl Of Ward Repalstbna(0h) Publmlan■: 20 CFR 1019,194- Rsoptalmy PNtaallon 29 CFR 1a10.1495 - Op10)A018111 far Asxldant #-raMtlan • slam and TfiQA 29 4FR 1110.1001 • Albestol 406PR 41,0ppR A, Osnsral PrWvlone 40 CFR 01."Pad p • Nollonal lmIsston amndoroa far FhaaNaul At PCIhXVh (HU-1 P) CaIr7"fi Cols of R0021stion► (CCR) TIN* B B OCR a41.9la 5;1,15 B CCR 1fi2i Ammkan Nalbnal Inam,na (ANSI) P1NbliM0bne 215279-Fundarnantsls CbmY4mNP lea 066INp1 And Opsntlan Of L"al rxmuot "torn ZF.2L0 . Prartlaea for haapintory prelaetian Amwrlaan Oppley fcr Tntlna and Ma1anY1 (ASTM) Moo Intlimto for Ooeupatlonal Sahty inn Haahh (NI0$M 77-171 OmpPWtIOMI WWO OfiIho" 5(mle2y Manual Bbvth Coast At 0901y Management NvIdet (sengmo) RUN 1407 INSURANCEAND BONDING: MARCOR carries standard General Liability Insurance in the Amount of $1 million per occurrenoe/$1 million aggregate with AIG Insurance Company, Best Rated A+16; and a $10 million dollar Umbrella with Steadfast Insurance Company, Best Rated A+15, MARCOR is capable of raising the Umbrella Policy to a $20 million limit if raaquired (at additional post), Bonds are provided at owner's account by Reliance Insurance Company of the State of Pennsylvania, Best Rated A-f+15. TERMS AND CONDITIONS: Incluslons: ` All egipment, labor, materials notifications, insurance and fees, ` Mobilization and de-moblll2atien of crushing plant. Location to be determined in field. See scope above for estimated quantities of materials, " Sanitary Facilities for MARCOR workers only, • All salvage is the property of MARCOR Ramadistion, NotificationsHees to SCAQMD and Cal/OSHA Removal of up to V-011 of dln from secondary pad. Materiels are to remain on site for future use. LL All secondary asphalt and concrete slabs discovered during demolition by others MARCOR has used square footages provided by City of Vernon for our estimate of quantities, ` Rough Grading and compaction by Track loader only, No spec provided at time of Quote, " Mutually agreeable contract terms - including MARCOR's Standard Propose YAgreement Form, " Pricing valid for 60 days. Environmental Controcting Services Since 1980. C - d EBEZ— T ZB—Z9S 'DWI `WD I lid I Q3W3N NOONYW WWt'2 r 6 B002 le ueC 7,100m4- ugluslons: The following is speclfloaily excluded from this work: " Any Hazardous Materials " Removal of any other hazardous material. Footings, grade beams etc. MARCOR assumes that slab was a parking lot, " Replacement of any materials removed unless specified In the Scope of Work. " This proposal excludes demolition of Items beyond three ( 3 ) foot below existing grads except as noted above. SWPPP Plan, Plan is in place by others. ' Adherence to Specification®/PrDcadures submitted to MARCOR after proposal submission. ` Distribution of crushed materials generated by others. " Costs or conditions caused by delays by others beyond MARCOR's control. " Layout, excavation, baokf ll and compaction except as noted above. Unknown hems below ground. ' Performancs andror Payment Bonds. ` Prevailing wages, union labor or overtime costs, unless specifically noted. t:tw s Rea onslbilltlss: The Ownerlagant Is responsible for providing the following: Water, power (including asslstancs to hook up temporary power). Staging areas for equipment. " 24 hour eecesa to the work area. " Site security. Parking for work force (free of charge). Designate those Items to be left or saved prior to MARCOR mobilization. ' Identification of underground utilities to be protected In place. TERMS OF PAYMENT: Payment wlll be progreeaive, net 30 days upon substantial completion. Substantial completion is defined as Complats visuai removal of asbestos materials and achievemont air. nlanrw,h— PRICING: Per the Soops of Work as specified herein (price valid for 60 days): $134,096,00 /LS Thank you for this opportunity to submit a proposal for this project, If you have any questions or require any additional Information, please do not hesitate to contact me at 562.921-2733. Respectfully Submitted, ACCEPTANCE: MARCOR Remediation, Inc, Agreed to this t (Signature) Ronald Rotzisn Project Managef (Date) Environmental Contracting Services Since 1980. �- d ESEZ- T z6-Z9S ' 0W I `W0I ld I 1I3W3N 2I03NUlk! WHisz t 6 9002 T E uer APPROVED FEB 0 4 '08 CITY COUNCIL COMMUNITY SERVICES & WATER DEPARTMENT Samuel Kevin Wilson, Director of Community Services & Water 4305 Santa Fe Avenue, Vernon, California 90058 _ Telephone (323) 583-8811 Fax (323) 826-1435 CITY CLERK DISTRIBUTION 1 /T_CLAODIA, A, (r) February 4, 2008 Honorable City Council City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Gentlemen: Contract No. 602 During the demolition of the site located at 5119 District Boulevard under Contract No. 602, U.S. Demolition discovered a concrete slab underneath the existing building slabs. The onsite contractor U.S. demolition has agreed to remove the slab for a not to exceed price of $132,909.00. The Community Services staff obtained bids from two additional contractors to remove the slab, their bids were slightly higher, see attached quotes. The City of Vernon Engineering Division requests authorization to issue a Change Order for additional work to be completed under time and materials with a cost not to exceed $132,909.00. This cost includes uncovering the slab, removal, process, crushing and spreading of the material over the site. Upon your approval a Change Order will be issued to U.S,�Demolition for the work. SKW/lm Attachments c: Eric Fresch Jeff Harrison Manuela Giron Suel Kevin Wilson, P.E. Director of Community Services & Water Exc(usive(y Industrial CITY OF VERNON COMMUNITY SERVICES & WATER DEPARTMENT CONTRACT CHANGE ORDER NO. 4 SUPPLEMENT NO. SHEET 1 PROJECT: DEMOLITION OF CITY OWNED BUILDINGS & STRUCTURES AT 5119 DISTRICT BLVD. — CONTRACT 602 TO: U.S. DEMOLITION, INC. REQUESTED BY: CITY OF VERNON OF 1 SHEETS P.O. NO. 011.00001 452 CONTRACTOR You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally included in the contract. The City of Vernon hereby approves the following changes: Removal of buried footings, concrete slab, asphalt concrete pavement and utilities that were discovered when the top slab was removed, excluding the work performed on Change Order #3. Work to be performed on a "time & materials" basis per the attached Rate Schedule and a Not to Exceed Cost of $25,000.00. Contract Amount (Base Bid) ...... ......... ... $ 337,965.00 Amount of This Change Order $ 25,000.00 Amount of Previous Change Orders ............ ..... .. . $ 138,558.00 Total Change Orders ....................................................... $ 163,558.00 Modified Contract Amount ......... ............. .... ........ .... ....... $ 501,523.00 By reason of this change order the time of completion will be adjusted as follows: q Approved: Date: DirecOYdffCmrdunity Services & Water We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted Date: �j�� O/ 0 P Contractor: • S o �l 'f'1 �� , (41 . By: Title: �'GSiI/%(►il — / woe c: rroject rtteit ontractorirurenasmg U. S Demoliliorr EQUIPMENT HOURLY RATE MINIMUM CHARGE Flatsaw Gas to 8" depth 110.00 300.00 Propane to 8" depth 115.00 300.00 Electric or Hydraulic to 12" deep 125.00 300.00 Handsaw Gas to 7" depth 100.00 225.00 Gas 8" - 12" depth 110.00 225.00 Hydraulic 120.00 225.00 Wallsaw Air to 24" depth 120.00 275.00 Hydraulic to 24" depth 135.00 275.00 Plunge Saw 175.00 4 hours Wiresaw call for price Grinder 110.00 4 hours 2 Man Torch 140.00 4 hours Laborer 50.00 4 hours 853 Bobcat Loader 100.00 4 hours 853 Bobcat Backhoe 125.00 4 hours 853 Bobcat Dump Combo 125.00 4 hours 853 Bobcat Ram 150.00 4 hours 4466 Cat Backhoe 110.00 4 hours 446B Cat Loader . 110.00 4 hours 4466 Cat Ram 175.00 4 hours 966 Wheel Loader 141.00 8 hours 973 Track Loader 165.00 8 hours 235/345/400 Excavator w/Backhoe 225.00 8 hours 235/345/400 Excavator w/Pulverizer 23 S. 8 hours 235/345/400 Excavator w/Ram 285.00 8 hours 300B Excavator w/Pulverizer Z 3.� > 269.90, 8 hours 300B Excavator w/Backhoe 225.00 8 hours Crushing Plant (per ton) 3.00 General Superintendent 65.00 4 hours Foreman w/truck& tools 55.00 4 hours 10 wlr/semi end dump 88/99 4 hours Off Road Truck 126.00 4 hours Standby (except heavy equipment) 60.00 15% Overhead & Profit will be added to these rates. Dump fees are market rate plus 15% Other materials charged at market rate plus 15% CITY OF VERNON COMMUNITY SERVICES & WATER DEPARTMENT CONTRACT CHANGE ORDER NO. ' 5 SUPPLEMENT NO. SHEET 1 OF 1 SHEETS PROJECT: DEMOLITION OF CITY OWNED BUILDINGS & STRUCTURES P.O. NO. 011.00001 AT 5119 DISTRICT BLVD. — CONTRACT 602 452 TO: U.S. DEMOLITION, INC. CONTRACTOR REQUESTED BY: CITY OF VERNON You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally included in the contract. The City of Vernon hereby approves the following changes: Removal of buried footings, concrete slab, asphalt concrete pavement and utilities that were discovered when the top slab was removed, excluding the work performed on Change Order #3 and Change Order #4. Work to be performed on a "time & materials" basis per the attached Rate Schedule and a Not to Exceed Cost of $50,000.00. *r DQC) Contract Amount (Base Bid)...... .......................................... $ 337,965.00 Amount of This Change Order I ....... .. .. ........ ... $ 50,000.00 Amount of Previous Change Orders .......................................... $ 163,558.00 Total Change Orders ... $ 213,558.00 Modified Contract Amount ............ ............... $ 551,523.00 By reason of this change order the time of D YS TO BE DETERMINED completion will be adjusted as follows: Approved: _ Date: Director of 06n u rty Services & Water We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. ,{ ,[, Accepted Date: T/ 0Y Contractor: v(. S /G� 0 1(s( t 77'k, ` /�q C . By: Title: c: Project File/Contractor/Purchasing %v/zV/V 6 Clam. HeeAlf i E.S. Demo/itior� EQUIPMENT HOURLY RATE MINIMUM CHARGE Flatsaw Gas to 8" depth 110.00 300.00 Propane to 8" depth 115.00 300.00 Electric or Hydraulic to 12" deep 125.00 300.00 Handsaw Gas to 7" depth 100.00 225.00 Gas 8" - 12" depth 110.00 225.00 Hydraulic 120.00 225.00 Wallsaw Air to 24" depth 120.00 275.00 Hydraulic to 24" depth 135.00 275.00 Plunge Saw 175.00 4 hours Wiresaw call for price Grinder 110.00 4 hours 2 Man Torch 140.00 4 hours Laborer 50.00 4 hours 853 Bobcat Loader 100.00 4 hours 853 Bobcat Backhoe 125.00 4 hours 853 Bobcat Dump Combo 125.00 4 hours 853 Bobcat Ram 150.00 4 hours 446E Cat Backhoe 110.00 4 hours 446E Cat Loader 110.00 4 hours 446E Cat Ram 175.00 4 hours 966 Wheel Loader 141.00 8 hours 973 Track Loader 165.00 8 hours 235/345/400 Excavator w/Backhoe 225.00 8 hours 235/345/400 Excavator w/Pulverizer 23 5 . > 8 hours 235/345/400 Excavator w/Ram 285.00 8 hours 300B Excavator w/Pulverizer ? 3 �' > 269.9g. 8 hours 300B Excavator w/Backhoe G' 225.00 8 hours Crushing Plant (per ton) 3.00 General Superintendent 65.00 4 hours Foreman w/truck& tools 55.00 4 hours 10 wlr/semi end dump 88/99 4 hours Off Road Truck 125.00 4 hours Standby (except heavy equipment) 60.00 15% Overhead & Profit will be added to these rates. Dump fees are market rate plus 15°% Other materials charged at market rate plus 15% of"' v COMMUNITY SERVICES Sr WATER DEPARTMENT Samuel Kevin Wilson, Director of Community Services & Water 4305 Santa Fe Avenue, Vernon, California 90058 Telephone (323) 583-8811 Fax (323) 826-1435 Honorable City Council City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 Gentlemen: February 28, 2008 APPROVED MAR 17 '08 CITY COUNCIL Contract No. 602 - C During the demolition of the site located at 5119 District Boulevard under Contract No. 602, the contractor, U.S. Demolition, discovered concrete slabs, concrete boxes, foundations as well as other miscellaneous materials underneath the existing building slabs. U.S. Demolition has agreed to remove the miscellaneous materials on a time & material basis. Change Order #4 in the amount of $25,000.00 was issued for this work but during work under this Change Order more material than previously known has been discovered. Additional funds are necessary. The City of Vernon Engineering Division requests authorization to issue a second Change Order for the additional work to be completed under time and materials with a cost not to exceed $50,000.00. This cost includes uncovering the material, removal, process, crushing of concrete and spreading of the base material over the site. Upon your approval a Change Order will be issued to U.S. Demolition for the work. SKW/Im Attachments c: Eric Fresch Jeff Harrison Manuela Giron (--evm Wflson, P.E. of Community Services & Water Excfusively Industhaf CITY OF VERNON CONTf"4,.t1:CT 'k.<4 ANG, E ORDER ` R NO. :.3UP $..i',M ENT N'IL.J'. SHEET T f` SHEETS �C ,l DEMOLITION CITY OWNED 111nILDINGS &STRUCfi'URr ��,��, IIII.tII,001 452 TO: U.S. DEMOLITION, INC. CONTRACTOR REQUESTED CITY fir' OF VERNON You ,are hera4*t'y directed tomake thy. hart in described claaar ges ts, the plans quad s ecificaa ions or do the f' ticowiiag destrilaed work not pvcvrc wdy itnclra•da cl in the plan, 'arad Slxa cfficat oirs of."this contnict. E,xcelat as sl cifica lty--nodified hercirt, all lorms and L ondititaras of the. original contnxt rvmain in full fcarcc and effi ct, and apply to the a d ib rail work as, it' paid work iras sariginadly included in the contract US. Demolition is hereby dilwed to removeand 6<lrsposc taf`the metatls and otmleurn c-4.ant.atatinated soil located on flu," 11 l 1, trit t--oulcvard site, raa cc4trdanc-e %vide thealtached S'€ opis of )Rork (.;t: . l�ita�califlr�rt 5.� ill i it irl Litt €lay �Lttr�il u"Intitie to@' Iaaaat�l iarl dispos' d or handled, The b lows ww=eig to ,teed volumes are, tor estitaaaati rarer jlosc�s onk-1 Item Cost Total, wqk A. 1 iavose of Metals ('011tamin a tee Soil I _ Load- tr°araspor, r, and dispose of Federal IkCRA and C`talil' rnia. laarz trdcrus w- a ste 26 wn vlt"itJd'con s i 1,%() Load, transport, alntl ditipo e ofnon-RCRA and CaliC r°niaa hazardous waste. `,0 lons $109/ton -M$5 i 'fask B. Dispose of l c.trtrl rrEtt lrrrltac.te t Soil 1, Excavate clean and later icnrar impacted soil 8,000 cy Wev $32,000 '. I.:taaadi trarir tac'rrt,,meal djsi osc (thermally twat) p0"roll,uin impactedsoil 10,00.0 trans S56!ton $560,000 J. Baackfill excavation with clean soil stnckpiled per Task. 13. l and o n zi to crushed Mersa. 8,000 cy S51cy $alll. 00 4. lkr cl"t+t t :=sril cc. tiraBased Mtn: aaewal firm; and raaatterittl4 for, as cost not: to excec I €i.d}(Jtl TOTAL S724,810 Allwork shall be pedortned *r. C of tra o A rtacaa_Itat 1 as id) . , ....... ....... tnCttrtt a:r�l l its It�trtL rd a ...... , ....724,810.00 _., -___ e aratarttft i C` Previous lr era C r' LaYr 21 558,00 _-_ Total Chanue Ordersands ._�..R_ .... �' Ltadi i a C'cr t,ac: �.tr cttttft ...... . ... . ...... . . .m. l ? >`i,, .11l ell-an,w 'adcr it lo t I az€ ' J, -5 c ale Iar d' s €nlatL.w€wa F lu tai! ;nd J tfel Iv in l,,ws Approved: Datc: D' ceto cifC;:aaturaa.trr q sUr vice-"s Water WC, I;he I15,Ive given ;: W611ar +'�aua!fC`.PeaL`io w €tic )j,, ogc t',r)[Hr"d aw, here I' y a gme, iTINS t7SF po.";" I$" Kpil1o4ed, fti l ue will povide al I }3t1C)F,. crttlllT at llr. a IYIsI GIt ,S: IlTCtEI 7€kL l3h'4IItl Y . C t 3S Etliky -0Jhc r"'i%c t L Ssoul ear Live, F11 pcir un U'W'Tvi .z"ti nc 3.�,,;m I'L�t Ltl 3 T't above t 4L7 E 4t: aAllti will ;t3=avvp! as is€II payment dke"n"fg1t rhw '4'avc. A ccqued Date;: � v2 �/ 0 s � `aarrtf,a�:trtr : (,6"f ' %�" d � l �7 a ✓i C t�l e ' --------- , ry t�7 C`�Ct{ Ida"f FI sa"iCz_fL7�'3 t}4S€L:-1Lfika�a;~ SCOPE OF WORK FOR CHANGE. ORDER NO. 6 TO C'ONTHACT NO, 02 RumediattOn of metals and Ix troleurn coma nband soils contained on the l roperty located at 5119 District Boulevard and ass outlined in the P[C EnvTirontrtentazl Sai ices reports dated Nla'tr '25. 26, and 27.2008. Task A, l+`eLRIS tvOtttU[ninat d Waste Disp,)s4fl li l t" ad, trnnsprq and dispose of 20± t,ttlric ya h (2& carts) of Federal ltt`RA and Cattifornia hazardous wasa; at either the U.S. l ,colog t'ac lity in _Beatty, Nevada, or the Waste Mautk ement Altlentatrr 1"liils llazarilon's Waste theiligN Pivvide hazaidous waste trranirests and tia.rlificd weiplr't dell ts. US, Demolition will be lurid fia sed on acts all terns (l spowd. ) Loal umnsport, and disposc of . 00± cuNc yards, ( 50at tons) of non-RCR , t : ,1117ornia lrazatr d ris warste to tl,S, 1;cofogy faci lily in att�7, Nevada or ilia, waste mankigernettt ettl man fUl s Hazardous Waste lhoility, Provide hazardous waste manifests and ec iAl ed weigg tickets. US, Demolition will be paid Ims d on acm al tons dispowd. Task 13. Excavate, Tra nsporl and Dispose of` Petrolemn Impac-led ;oil Utilizing Clef=site "l h rniat Destructicrtt: l..xc.a ate clean sod itl order to provide access to pd troleum hnpatcsted soil Excavate lreuvimul impacted sc-ril_ A total ofapproximately BA00 cubic yards will be excatvarted. Clean soil shall be segmpttd orn cont,ttni,nated soil and stockpiled lo, r batcklill. 1. e av°at€gat shall iaac: nde any iecessary slot ctiffing where a "Neat Excavation" is necessa, LIS. Dernolithn mAl fie pa id based on actual quantity ofsoil excavate([ both clean and tonrar inalt tl. € oad_ tram arson, and disp s (dierntxaily treat) aj)P11�xii)-jf1tejY 104000 turfs € Ff' etrojcttnr k patcted sail at the RTfacility in Lynwood, Catlifdrniat, or the TRS futility in Azttsa,. trarlif 5t° th. Prav% disposal niat ikst9 and eeniAed x,vcigltt 6okets. US. DenioNon W11 be paid frs d Ott aetoaal tons of material dkposed. aj Reco npxact ematvattedatrea wilh clean soil stockpile fi-orn the excavatedarea and crush nrisc llatrte3c�trR liar e ti ttttetttl�' l i$., t cf rtt tl� sits. 13ackfil1 material shall lie Compacted to a relaadve corapaction of 9t1%{ U.S. Demolition vv'ill be paid based on the ct al volmne cri rtta<wriaal backl'ilied Act compaol- d- 7 td.e:t&n fire set -vices oVa 0cotea:hnicA Engineer to CeAi "v the e0tttpatc Lion of lic laaclaf ll material. APPROVED MAY 19 '08 CITY COUNCIL COMMUNITY SERVICES & WATER DEPARTMENT CITY CLERK DISTRIBUTION Samuel Kevin Wilson, Director of Community Services & Wate j ft.l,& d C L A U 1>1 A A., 4305 Santa Fe Avenue, Vernon, California 90058 Telephone (323) 583-8811 Fax (323) 826-1435 May 15, 2008 Honorable City Council City of Vernon Gentlemen: Contract No. 602 The City is in the process of demolishing the structures at 5119 District Boulevard under Contract No. 602. During the removal of the footings of the building a leaking underground tank was discovered. The City retained the services of PIC Environmental Services, Inc. (PIC) to investigate the extent of the soil contamination. PIC has concluded their investigation and has determined that an area approximately 100 feet by 80 feet to a depth of 25 feet contains petroleum contaminated soil. Approximately 8,000 cubic yards of soil will have to be excavated and treated in order to receive environmental clearance on the property. In addition during the demolition metal contaminated debris and brick was encountered. This material is required to be hauled off and disposed of in a hazardous waste landfill. City staff has sought and received three proposals to remove the metal contaminated debris and remediate the petroleum contaminated soil. Two means to treat the soil was proposed. The first method was to excavate the soil and haul the soil to a thermal treatment facility where the soil is rendered non- hazardous. The second method is to land farm the petroleum impacted soil, which has more uncertainty as to time to remediate, success in the remediation process and would require regulatory review. The cost to haul the soil offsite and thermally treat the soil is approximately $55,000 more than the land farming proposal, however City staff is of the opinion that given the risks associated with the land farming methodology, that the thermal treatment method be utilized. It is hereby recommended that the City issue two change orders to accomplish the remediation of the soil on the Thermador site: 1) Change order (#6) be issued to U.S. Demolition in the amount of $725,000 to excavate, remove and dispose of the petroleum impacted and metals contaminated soils. The exact cost will be based on the exact quantities of soil excavated, hauled off and disposed and the amount of material backfilled based on per ton and per cubic yard costs. Ea cfusivefy Industfial City Council -2- May 15, 2008 2) Change order (#2) be issued to PIC Environmental Services in the approximate amount of $30,040 based on time and materials to perform environmental oversight of the remediation activities and laboratory testing. Actual cost will be based on the number of oversight hours provided and number of soil samples required to be analyzed. Sincere , 1 Samuel Kevin Wilson, P.E. Director of Community Services & Water SKW/ca Enclosure V=+t� BeRVIN011 CONTRACTORS LICENSE # 778598 SUBMITTED TO: City of Vernon PROJECT: Soil Remediation 4305 Sante Fe Ave. 5119 District Blvd. Vernon, CA 90058 Vernon. CA TELEPHONE: 323-583-8811 FAX: 323-826-1435 ATTN: Kevin Wilson We propose to furnish materials, labor, and equipment (the work) in accordance with the specifications, terms and conditions as set forth below for the sum of: $ See Below Payment due within thirty (30) days upon substantial completion of the work. Payment for work completed the preceding month shall be received by the tenth (10th) of the following month and payment in full shall be made within thirty (30) days of completion. A charge of 1 Y2% per month (18% per year) will be charged on past due accounts. Payment in full shall be made if a break of continuity of work exceeds thirty-five (35) days. Should legal action be necessary for any reason, prevailing party shall have legal fees reimbursed, including interest. U.S. Demolition hereby proposes to provide the following scope of work: Pricing per instruction letter dated 4-8-08, per items listed 1-4: 1) $ 89,192.00 2) No Bid 3) $ 627,000.00 Re -compact with existing stockpiled base material. Proposed utilizing ART site for thermal treatment of TPH soil only, no back haul of treated material included. 4) $ 723,000.00 Includes hauling of material off site to a properly licensed landfill. Includes backfill and compact with on site base material. Alternate: Provide on site consultant to monitor activities and provide clearance sampling protocols including 1166 monitoring, perimeter air sampling, etc. Covers up to 8,520 CY of soil. Also includes compaction testing for backfill. Add: $ 38,000.00 Alternate: Utilize on site soil in lieu of base materials for backfill and compaction to 90%, based on 8,000 CY quantity: Add: $19,200.00 Exclusions / Conditions 1 move in; Includes slot cutting as required at areas where "neat excavations" are necessary due to slope back not being possible; On -site consultant included to provide activity specific H & S plan, AQMD 1166 permit, and daily oversight by a field technician. Sampling protocol will be in accordance with RWQSB / DTSC guidelines. Breakouts of per ton pricing pricing: RCRA material: $ 460.00 Ton Non-RCRA material: $109.00 Ton TPH soil Thermal treatment: $ 56.00 Ton TPH soil landfill: $ 65.00 Ton Additional soil excavation and stockpile immediately adjacent to hole: Add $ 4.00 CY Backfill and compact additional base materials: Add: $ 5.00 CY Backfill and compact additional on site soils: Add: $ 6.00 CY 4510 E. Eisenhower Circle, Anaheim, CA 92807 "PHONE 714-695-9026 *FAX 714-695-9024 VernonSoil2 Compaction testing: Per hour: Forthcoming CONDITIONS/EXCLUSIONS: One move -on; straight time work; no footings below 3 feet; slab and removal based on four to five inches (4-5"). Excludes permits; layouts; identification or location of underground utilities; disconnect or capping of utilities; excavation, grading or compaction; shoring or bracing; fencing; barricades, protective covers or canopies; underpinning or falsework; protection of finished surfaces; floor preparation, grinding or mastic removal; bushing / roughening of surfaces; removal of hazardous waste; demolition, removals, concrete cutting or drilling for other trades. All Conditions/Exclusions apply unless otherwise indicated above. OUR CONDITIONS/EXCLUSIONS SHALL BECOME A PART OF THE SUBJECT CONTRACT AGREEMENT SHOULD WE BE THE SUCCESSFUL LOW BIDDER ON THIS PROJECT. Submitted By: U. S. Demolition, Inc. Scott Moore, Owner Date of Submittal: 5-13-08 4510 E. Eisenhower Circle, Anaheim, CA 92807 Approved By: Signature: Print Name: Date of Acceptance: PHONE 714-695-9026 *FAX 714-695-9024 VernonSoi12 CITY OF VERNON COMMUNITY SERVICES & WATER DEPARTMENT CONTRACT CHANGE ORDER NO. 7 SUPPLEMENT NO. SHEET 1 OF 1 SHEETS PROJECT: DEMOLITION OF CITY OWNED BUILDINGS & STRUCTURES AT P.O. NO. 011.00014 5119 DISTRICT BLVD. — CONTRACT602 - RESOLUTION No. 9442 52 TO: U.S. DEMOLITION, INC. CONTRACTOR REQUESTED BY: CITY OF VERNON You are hereby directed to make the herein described changes to the plans and specifications or do the following described work not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally included in i:he contract. The City of Vernon hereby approves the following changes: Trench Plate and Toilet Rental for one month from completion of crushing operations io commencement of soil remediation. Contract Amount (Base Bid) $ 337,965.00 Amount of This Change Order ............................................. $ 516.00 Amount of Previous Change Orders ......................................... $ 938,368,00 Total Change Orders ..................................................... $ 938,884.00 Modified Contract Amount .............................................. $ 1,276,849.00 By reason of this change order the time of 0 completion will be adjusted as follows: Approved: Date: - /�—egg it" m ity Services & Water Attest: Date: l �' Manuela Gir , City Clerk We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefore the prices shown above. Accepted Date: / �� Q d Contractor: By: Title:�-- c: Yroject rile/Contractor/Yurchasmg Rev. 06/08 - 4510 E. Eisenhower Circle Anaheim CA 92807 U. S. Demolition Phone: (714) 695-9026 FAX: (714) 695-9024 Change Order Request U.S.D. C.O.R. #: 07 U.S.D. Job # 5135 Customer Job #: 602 Ref #: Grading To (Customer) City of Vernon Attention: Kevin Wilson Phone #: 323-583-881 1 FAX #: 323-826-1435 Job Name/Address: Demolition @ 5119 District Blvd. Vernon, CA As of submittal date, this scope of work is: 0 Performer ❑ Not Performed ❑ In Progress Description of Extra Work: Date/ FCO # Description Rate Hours Total Trench Plate and Toilet Rental for one month from completion of crushing operations (4/30) to commencement of soil remediation (5/29). (dates on invoices not exact, but we are charging for one month rental) Andy Gump One Month 162.40 Trench Plate Rental One Month 280.00 Subtotal 442.40 Mark up 15% 66.36 Subtotal 508.76 Bond @ 1.5% 7.63 Change Order Request Total: 1 516 (rounded to nearest dollar) Customer: By signing below, you authorize U.S. Demolition to proceed with the work described above at the amount listed and verify that you are authorized to do so. If the work has already been performed, or is in progress, your signature acknowledges that your company authorized U.S. Demolition to proceed with the work described above. Signature: Name: Title: Date: U.S. Demolition, Inc. Submitted By: &AV.,- O-A? Scott Moore Project Manager Submittal Date: 7/24/2008 5135COR07 ANDY GUMP, INC. , FED. I.D. # 95-2588604 „ Q_ 26954 RUETHER AVE. SANTA CLARITA, CA 91351 992 VOICE (800) 7 FAX (661) 251 7729 -77 TEMpol4A`vlAndy.3y ESEIRVICES. www.andygump.com "There ie a' ®iffe"rence" INV01C:E # C531:10- IU k'' ."i 1)-1 'a] VDICE BILL TO: ; � � ? JOB TYPE; JOB TYPE: U8 DEMI.ILITICIN ADDRESS: �11 I IrT-RIL BLVD cc 451.0 E ET13FN(-OWER CIRCLE ANAIiE II k, CA 92801 CITY: VERNON900 8 MAP # f,i --E4 C/S: C/S ATLANTIC BLVD TRACT #: LOT #: METER ADD: TP MAIN #: PHONE: 714..6 5-90 26 PHONE: 714-9st -63 AG DRIVER IHEC--ro•t l i I`f I I LOON N EC E I 'T I I t I/ 11 i 8 41 ANDY GUI'�P W/HAIgDWNf3I-j 8),09 e�f 1-a i"Is 17.�'{z11 ' a 1. �0' 1 1 CIS Wr'HW WL'EkL\( Fit RV1C. 5/09 -6105 Efit A 1,219. ON 1 39s 0 ��f�'IIt3E1 L if' trt �t7 i it r • �I'I1 J. 00 UN .I. T V 32401 r: 9 (1 959) *-*AE MAY 1 4 2008 13 Y: ___m______oav_o__ SUB i I.su�.YAL. PLEASE RETURN ONE COPY WITH REMITTANCE WHICH IS DUE UPON RECEIPT PLEASE REMIT PAYMENT TO: TEMPORARYAndyGum SERVICES��' b T 26954 RUETHER AVENUE — SANTA CLARITA, CA 91351 • PORTABLE TOILETS • FIELD OFFICES • TEMPORARY POWER POLES • AUGER KING HOLE DRILLING • RESIDENTIAL PUMPING • FENCING • SPECIAL EVENTS �E nr%nTA nl wn—w i A nr•. r-\ /n nr-. r+\ /l r�r•r•� w-r v/ /r- r�r+-r, r.• l r. a- -.-. ,.- l F-l. r. r-.-- Invoice INVOICE NUMBER: 1 1-02145-08 INVOICE DATE: 5/14/08 Billing Address:, Pr6Ject Info U S DEMOLITION Prdect Name: 5135 Job # : 5135 ACCOUNTS. PAYABLE Ordered 8' : HERB CLARK P10 Number. 5135 510 E, EISENHAUER CRC Phone: 714-695-9026 JS Contact: HERB CLARK NAHEIM CA 92807 Job Clt . VERNON CA Job Site phone 714-695-9026 ffice Phone: map Log: 675 E5 PaaeNcell. 714-936-4006 ust ID #: 940843 ob Site Location: ATLANTIC & DISTRICT`675 E5 Delivery Instructions: PLEASE DELIVER 02-20-08 BEFORE 11:30 CUSTOMER CAN NOT OFFLOAD Start Rent Date : 2/20/08 Rental Contract Number DWY00523-08 Status Qty Item Description and Rate From Thru Rate Each Rate DateDate Extended Out 2 1.0 in.x8X10 Rock Plate 4/16/08 5/13/08 140.00 ' 280.00 EACH. 5.00/Day 35.00/Week 140.0014 Week 5 Days Min RP 1702, RP1698 Labor ME MAY 1 6 23318 BY------------ lllvul :C Ju ERMS: C.O.D. Accounts, Deposit Estimate Due Upon Delivery. Credit Accounts are due and payable net 30 days from invoice date. This invoice is subject to additional terms and conditions printed on the reverse side hereof, limiting the seller's warranty, obligations and excluding liability for consequential damages. Contract #DWY00523-08 Customer:U S DEMOLITION Page 1 of 1