Resolution No. 2011-005RESOLUTION NO. 2011-05
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON ACCEPTING THE BID OF SAK CONSTRUCTION, LLC
FOR THE INSTALLATION OF STORM DRAIN TRENCHLESS
MANHOLE -TO -MANHOLE PIPE LININGS AND SECTIONAL
LININGS (POINT REPAIRS) ALONG VERNON AVENUE
WHEREAS, Contract No. CS-0015 of the City of Vernon was
approved by the City Council of the City of Vernon pursuant to
Resolution No. 2010-157, and sealed bids were opened on
December 8, 2010; and
WHEREAS, said bids were referred to the Director of
Community Services & Water, who recommends to the City Council in a
memo dated December 16, 2010, that Contract No. CS-0015 for the
installation of storm drain trenchless manhole -to -manhole pipe linings
and sectional linings (point repairs) along Vernon Avenue be awarded
to SAK Construction, LLC on the basis of its bid in the amount of One
Hundred Ten Thousand Two Hundred Ninety Dollars and Thirty Cents
($110,290.30), being the lowest responsible bidder.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The City Council of the City of Vernon does
hereby award Contract No. CS-0015 to SAK Construction, LLC in
accordance with the recommendation of the Director of Community
Services & Water, and authorizes the Mayor or Mayor Pro-Tem to execute
the Contract for, and on behalf of, the City of Vernon, and the City
Clerk, or Deputy City Clerk, is authorized to attest thereto.
SECTION 3: All other bids are rejected subject to execution
of the contract and the City Treasurer is hereby directed to return to
unsuccessful bidders any cashier or certified checks deposited with
said bids upon the receipt of an executed contract from SAK
Construction, LLC accompanied by all required bonds and certificates.
SECTION 4: The City Clerk of the City of Vernon shall
certify to the passage, approval and adoption of this Resolution, and
the City Clerk of the City of Vernon shall cause this Resolution and
the City Clerk's certification to be entered in the File of Resolutions
of the Council of this City.
APPROVED AND ADOPTED this 3rd day of January, 2011.
AT
Willard G. YamgKgPchi, (Vity Clerk
Name: Hilario Gonzales
Title: Mayor
2
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
I, Willard G. Yamaguchi, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution
No. 2011-05, was duly passed, approved and adopted by the City Council
of the City of Vernon at a regular meeting of the City Council duly
held on Monday, January 3, 2011, and thereafter was duly signed by the
Mayor or Mayor Pro-Tem of the City of Vernon.
Executed this '� day of January, 2011, at Vernon, California.
(SEAL)
Willard G.
uchgj City Clerk
- 3 -
CITY CLERK'S OFFICE
INTER -OFFICE MEMORANDUM
DATE: January 5, 2011
TO: S. Kevin Wilson, Director of Community Services & Water
FROM: Willard Yamaguchi, City Clerk V
RE: Resolution No. 2011=05 - A Resolution of the City
Council of the City of Vernon Accepting the Bid of Sak
Construction, LLC for the Installation of Storm Drain
Trenchless Manhole -to -Manhole Pipe Linings and
Sectional Linings (Point Repairs) Along Vernon Avenue
Transmitted herewith is a copy of Resolution No. 2011-05,
referenced above, which was approved by City Council on January
3, 2011.
wY:dj
c Resolution No. 2011-05
Contract No. CS-0015
e v-�1 -1 '�' !,r21vll .--- 7
TO: Honorable Mayor and City Council
FROM: Samuel Kevin Wilson, Director of Community Services & Water
RE: Contract No, CS-0015: Vernon Avenue Storm Drain Trenehless Manhole -To -
Manhole Pipe Linings & Sectional Linings (Point Repairs) Project — Bid Award
The bids for Contract No. CS-0015, Vernon Avenue Storm Drain Trenchless Manhole -To -
Manhole Pipe Linings & Sectional Linings (Point Repairs) Project, were received and opened on
December 8, 2010. The calculated results are as follows:
SAK Construction, LLC $ 110,290.30
Sancon Engineering Inc. $ 185,983.00
The project consists of cleaning and performing Closed -Circuit Television (CCTV) in the
existing pipes. Install new pipe liners using Cured -In -Place Pipe (CIPP) method to repair damaged
sections of the storm drain main on Vernon Avenue. The project also involves sectional lining (point
repair) on 10 sections of cracked existing pipes. Existing lateral connections located within the lining
sections shall be cut open and reconnected after installation of the linings. The lined sections of the
pipes shall be CCTV again for final approval.
The project was first bid in April 2008. At that time there was only one bidder with a bid
amount of $233,064.00. The City Council was rejected the bid, since only one bid was received and
the cost was over the budget. SAK Construction, LLC's bid amount is 47.32% of the 2008 bid for the
same project.
I recommend that Contract No. CS-0015 be awarded to SAK Construction, LLC in the bid amount
of $110,290.30 and a resolution awarding the contract be adopted and the Mayor and City Clerk be
authorized to execute the contract documents.
4 Of.vRR
-
9
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: Mark Whitworth, City Administrator
FROM: Samuel Kevin Wilson, Director of Community Services & Water
DATE: December 16, 2010
SUBJECT: CONTRACT No. CS-0015 — VERNON AVENUE STORM DRAIN TRENCHLESS
MANHOLE -TO -MANHOLE PIPE LININGS & SECTIONAL LININGS (POINT
REPAIRS) - BID AWARD
The bids for Contract No. CS-0015, Vernon Avenue Storm Drain Trenchless Manhole -To -
Manhole Pipe Linings & Sectional Linings (Point Repairs) Project, were received and opened on
December 8, 2010. The calculated results are as follows:
SAK Construction, LLC $ 110,290.30
Sancon Engineering Inc. $ 185,983.00
The project was first bid in April 2008. At that time there was only one bidder with a bid amount
of $233,064.00. The City Council was rejected the bid, since only one bid was received and the cost was
over the budget. SAK Construction, LLC's bid amount is 47.32% of the 2008 bid for the same project.
It is my recommendation that Contract No. CS-0015 be awarded to SAK Construction, LLC in the
bid amount of.$110,290.30. SAX Construction, LLC has been found to be a licensed, financially capable
company and has satisfactorily completed similar capital improvement projects with other public agencies
in Southern California. Please place this item on the January 3, 2011 City Council meeting agenda. Thank
you.
SKW/pc
Enclosures
� pF VgR
V• �J
oiGl`� Rye
mop t
Bf LY 1"9
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: Willard Yamaguchi, City Clerk/Interim City Attorney
FROM: Samuel Kevin WilsorNirector of Community Services & Water
DATE: February 17, 2011
SUBJECT: Vernon Avenue Storm Drain Trenchless Manhole -To -Manhole Pipe Linings &
Sectional Linings (Point Repairs) CONTRACT No. CS-0015
Enclosed are Contract No. CS-0015 documents, in triplicate. Please sign the documents where
indicated and forward the documents to the City Mayor Mr. Hilario Gonzales for his signature.
Please return the documents to my office when they are completed. Thank you.
SKW/pc
Enclosures
O:W ENGNEERMOC.I.P.Projects\607-(CS-o015)-Ver o S.D.L &g-Bidding\ComWmdenoe\Memos\Citysigr t 021711.doc
CITY CLERK'S OFFICE
INTEROFFICE MEMORANDUM
DATE: March 8, 2011
TO: S. Kevin Wilson, Director of Community Services & Water
FROM: Willard Yamaguchi, City Clerk
RE: Contract No. CS-0015 - Vernon Avenue Storm Drain Trenchless
Manhole —to -Manhole Pipe Linings & Sectional Linings (Point
Repairs)
Transmitted herewith are two duplicate originals of the contract
referenced above, approved by the City Council of the City of Vernon
on January 3, 2011, through Resolution No. 2011-05.
If you have any questions, please let me know.
Thank you..
WY: dj
Attachments
c: Contract No. CS-0015
Resolution No. 2011-05
CITY OF VERNON
CALIFORNIA
VERNON AVENUE STORM DRAIN
TRENCHLESS MANHOLE -TO -MANHOLE PIPE
LININGS & SECTIONAL LININGS (POINT REPAIRS)
CITY CONTRACT No. CS-0015
BID OPENING DATE: December 8, 2010
COMMUNITY SERVICES & WATER DEPARTMENT
4305 SANTA FE AVENUE
VERNON, CA 90058
(323)583-8811
TABLE OF CONTENTS
A.
NOTICE INVITING SEALED PROPOSALS BIDS)
Page
............... ......................................
A-1
B.
INFORMATION FOR BIDDERS
1. General
..........................................................................................
2. Contract Documents
............................... ....I................
...........................................................
3. License
B-1
4. Proposals
B-1B-1
.......................................:...............................
5.. Contract and Bonds
........................... ..................................
6. Addenda
B-2
........................................................................
7. Withdrawal of Bid
B-3
.......................... ...
..........................
.....................................................
8. Award or Rejection of Bids
B-3
............. .
9. Bidders Interested in More Than One Bid
................................... ............
......................................
10. Insurance and Financial Requirements .....
B-3
................ .............
11. Preliminary Estimate ...........................
B-3
.............................................................:............ ..........
12. Deductive Items
B-3
......... ...........................................................................................
13. Tour of the Site
B-4
...............................................................................
14. Project Description .................................
B-4
. ........
15. Project Map ....................................
B-4
...................
B-5
C.
BID FORM PROPOSAL TO THE CITY OF VERNON
1. Proposal ..........
..................................................................................... .................
2. Bid Prices
C-1
{
............. ............
3. Materials
C-2
4. Subcontractors
.................................................................................. .............................
5. Deposit of Security .........................:.
C-6
................................................................ ....................
. Bonds
C 7
.......................................:............. .
7. Withdrawal
C-7
.
.........I .............. ........
..........................................:....................................
8. Principals....................................................... .
C-7
9. License and Signature ................
.........
.....................................................................................
10. Bidder's Qualifications .....................................
C-8
.........................................................................
11. Contractor's Acknowledgement of Insurance Requirements
C-9
..................... .....
. ...........................
C-10
D.
CONTRACT
Article 1. GENERAL
...................... ........D-1
Section 1. Scope of Work .......................
.......D-1
Section 2. Term of Contract.........................
................................................................................ .....D-1
Section3. Consideration
.................................................................................................................D-1
Section 4. Payments .................................
.............. ..D-1
Section 5. Contract Documents
......................................................:.......... - ..................... ......
........ .....D-2
Section 6. Compliance with Provisions of Law
. ..............................................
.................. ................D-3
Section 7. Costs and Attorney's Fees .......................
.........D-3
Section8. Notices
.......... ................................................ .....................................................
Section 9. Conflict with Plans and Specifications
............................ .........................D-3
Section 10. Assignment.....................................................................
.............D-3
Section 11. Paragraph Headings.........................................................................
...........................D-3
Section 12. Authority of the City's Representative
............................................................................D-4
i
Page
Article 2. WAGES, HOURS AND WORKING CONDITIONS.................................................... D-4
Section 13.
General Prevailing Wages ....................
Section14.
Hours of Work
Section15.
..................................................................................................................
Apprentices
D-4
Section16.
..................................................................................................................
Subcontractors
D-4
Section17.
..................................................................................................................
Discrimination
D-4
Section 18.
..................................................................................................................
Safety
D-5
Section 19.
...................................
Competence of Workers
...................................................................................................
D-5
Article 3. INSURANCE, INDEMNIFICATION AND BONDS ..................................................... D-5
Section20. Insurance.................................................................................................................. D-5
Section21. Indemnification................................................................................................................. D-6
Section 22. Workers' Compensation.................................................................................................... D-6
Section 23. Labor and Material Bond ....................................... :.......................................................... D-6
Section24. Performance Bond............................................................................................................ D-6
Article4. PERFORMANCE....................................................................................................I........ D-6
Section 25.
Time for Completion........................................................................................................
D-6
Section26.
Force Majeure
Section27.
..................................................................................................................
Utility Relocation
D-7
Section 28.
..............................................................................................................
Public Convenience
D-7
....................................................................................I.....................
D-7
Section29.
Excavations..................................................................................................................
D-8
Section30.
Extra Work
Section31.
..................................................................................................................
Clean-Up
D-8
Section 32.
..................................................................................................................
Materials
D-9
Section 33.
... .................................................. ..............:........................................... ...
Permits and Licenses
D-9
.........................................................................................................
D-9
Section34.
Land and Rights of Way...................................................................................................
D-10
Section 35.
Plans and Drawings
Section 36.
............................................. ........ ....................:.................................
Shop Drawings Submitted by the Contractor
D-10
...................................................................
D-10
Section 37.
Supervision by the Contractor..........................................................................................
D-11
Section38.
Inspection of Work
Section 39.
...........................................................................................................
Correction of Defective and/or Unauthorized
D-11
Work..........................................................
D-12
Section 40.
Errors or Discrepancies Noted by the Contractor........................................................... ...
D-12
Section41.
Equipment ...... ..........................................................................................................
D-12
...
Article5. MISCELLANEOUS..........................................................................................................D-12
Section 42.
Damages for Delay.............................................................................................
Section 43.
Guarantee
Section 44.
Risk of Loss Prior to Final Acceptance..............................................................
Section45.
Termination ......... ...............................................:...........................................
Section 46.
Records, Inspection, and Audit..........................................................................
Section 47.
Standard Specifications..........
.............................................................................
Section 48. Independent Contractor.......................................................................................
Section49. Waiver.......................................................................:................:............
Section 50. Governing Law ............................. .....:...............................................
.................
Section 51. City Not Obligated to Third Parties...................................................................
Section 52. Dispute Resolution..............................................................................................
..D-12
..D-13
........... ..D-13
........... ..D-13
........... ..D-14
I..I....... ..D-15
........... ..D-15
........... ..D-15
........... ..D-15
........... ..D-15
........... ..D-15
it
PaLye
Section 53. Assignment of Unfair Business Practices ......................... ............. D-16
..................................
Section 54. Entire Agreement .................................................. .... D-16
Section 55. Headings and Captions .......................................... ............. D-16
............................................
Section 56. Authority to Execute this Contract.................................................................................. D-16
Section57. Severability................................................................................................................ D-17
Section 58. Counterpart and Duplicate Originals ............................................ ............................... D-17
Section 59. Survival of Terms .......................................... ................ D-17
E. BOND FORMS AND INSURANCE REQUIREMENTS ............................................................... E-1
Workers' Compensation Certificate
..................................
................................................
PerformanceBond
E-2
..................................... I.........................................................................
Labor and Material Bond
E-3
................................:.....................
InsuranceSchedule
................................................ E-5
..........................................................................
Documentation Required ............ .....................................
............................... ...... E-7
I.
Proof of Insurance, Approval as to Form
...................:............................ ............ E-7
................... ............
Sample Irrevocable Letter of Credit
........................................................ E-8
....................................
. E-9
F. SPECIAL PROVISIONS
.............................................
..................................................... F-1
I. GENERAL
...................................................
Standard Specifications
............................................ ............... F-1
................................................:
Examinationof the Site
............................................... ............... F-1
. ................................ I.............................................................................
Mobilization................................................................................................
F-1
TrafficControl
............... F-I
.......................................................................................
Prohibited Parking In Work Area
................. ....... F-1
.............................................
ConstructionSchedule
..................................................... ....... F-1
.............................................................
ConstructionHours
........................................ .......... F-1
. ..........................................................................
Construction Signs
.......................... ........... F-2
.........................................
Construction Activities Coordination
F-2
.................................................
MaterialSubmittals
.............. F-2
................................................................
Public Convenience
.......:....................................... F-2
..............................
Temporary Water Meter
..... 17-2
....................................................:
Private or Public Property Damage ......................
............................................. .............. F-2
. ................................................................................
Cleaning of the Site During Construction
F-3
................................
Storm Water Pollution Prevention Plan (SWPPP)
......................................................... .. F-3
...............................................
Sanitary Facilities
..................... .......... F-3
.................................:.
UnitPrices
.... F-4
..............................................................................
Existing Offset Manholes on Vernon Avenue
F-4
..............................................
Additional Pipe Quantities
..................... ................. F-4
..................................................
........................................... .................. F-4
II. TRENCHLESS MANHOLE -TO -MANHOLE PIPE LININGS & POINT REPAIRS .......... F-4
500-1.1.1 General.................................................................................................... F-4
500-1.1.4 Cleaning and Preliminary Inspection ...................I F-5
500-1.1.5 Television Inspection ............................................ ....... F-5
..............................................
500-1.1.7 Miscellaneous....................................................... . .......... F-5
...........................................
500-1.2 Pipeline Point Repair,..............................................................................:...........:.... F-6
500-1.4 Cured -In -Place Pipe Liner (CIPP) ........... F-6
...............................................
500-1.7.5 Chemical Resistance and Physical Testing ............................................................... F-6
..........................................
500-1.7.6 Installation and Field Inspection .......I ................ F-6
...........................................
500-1.7.7 End Seals ............ ................ ......................................................................... F-6
G. STANDARD PLANS
ff
NOTICE INVITING SEALED PROPOSALS (BIDS)
NOTICE IS HEREBY GIVEN that the City of Vernon, (hereinafter "City") invites and will receive
sealed proposals (bids) up to the hour of two (2) o'clock p.m. on Wednesday, December 8, 2010 (according
to the clock in the City Clerk's office), for the furnishing to said City of all transportation, equipment,
materials, labor, supplies and services necessary for Contract No. CS-0015, Vernon Avenue Storm Drain
Trenchless Manhole -to -Manhole Pipe Linings & Sectional Linings (Point Repairs). Proposals (Bids)
shall be submitted to:
City Clerk
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
At said time, the bids will be opened in public and announced at the offices of the City. Bids shall
conform to and be responsive to the requirements for Contract No. CS-0015, Vernon Avenue Storm Drain
Trenchless Manhole -to -Manhole Pipe Linings & Sectional Linings (Point Repairs) and must be
accompanied by a bid bond. The City Council of the City reserves the right to reject any and all bids. Copies
of the Contract No. CS-0015, Vernon Avenue Storm Drain Trenchless Manhole -to -Manhole Pipe
Linings & Sectional Linings (Point Repairs). Proposals (Bids) are on file and maybe examined in the
office of the City located at:
mailed).
2010.
Community Services & Water Department
4305 Santa Fe Avenue
Vernon, CA 90058
Copies may be obtained from said office with a nonrefundable deposit of $20.00 per set ($40.00 if
Dated at the office of the City Cleric of the City of Vernon, this — day of
WILLARD YAMAGUCHI, CITY CLERK
of the City of Vernon, California
- A-1 -
B. INFORMATION FOR BIDDERS
1. General
The work hereunder must be done in strict conformity with the plans and specifications adopted and
approved by the City for Contract No. CS-0015, Vernon Avenue Storm Drain Trenchless Manhole -to -
Manhole Pipe Linings & Sectional Linings (Point Repairs).
2. Contract Documents
(a) The Contract Documents shall consist of the following:
Notice Inviting Sealed Proposals (Bids)
Information for Bidders
Bid Form Proposal
Bid Bond
Contract
Performance Bond
Labor and Material Bond
Proof of Insurance
Workers' Compensation Certificate
Special Provisions
Detailed Plans and Specifications
Standard Specifications and Drawings
(b) All terms and conditions contained in the Contract Documents shall become a part of the Contract
entered into between the successful bidder and the City. The City Council of the City reserves the right to
reject any and all bids, and to waive any and all irregularities in any bids.
3. License
A bid submitted by a Contractor who is not licensed in accordance with the provisions of Division
III, Chapter 9, of the Business and Professions Code of the State of California will not be considered for
award.
4. Proposals
(a) Bids must be made in. accordance with the following instructions:
(1) Bids shall be made on the Bid Form Proposal furnished by the City as a part of Contract No.
CS-0015, Vernon Avenue Storm Drain Trenchless Manhole -to Manhole Pipe Linings & Sectional
Linings (Point Repairs) All bids shall be properly executed with the signatures of all signatories written in
longhand. All blank items shall be filled in. Numbers shall be spelled out and written in Arabic figures. If
the words and Arabic figures are different, the words shall be used and the Arabic figures disregarded.
Erasures, interlineations or other corrections shall be authenticated by affixing next to the mark or correction,
or in the margin immediately adjacent thereto, the initials of the signatory(ies) to the bid. If the unit price
and the total amount set forth by a bidder, for any item, are not in the Bid Form Proposal, the unit price alone
shall be considered as representing the bidder's intention, and the totals shall be corrected to conform thereto.
(2) Bidders must submit bids on all of the schedules set forth in the Bid Form Proposal.
(3) Bids shall not contain any recapitulation of the work to be done. Alternative proposals will
not be considered except as specified. Oral, telegraphic and/or telephonic proposals or modifications will not
be considered.
B-1
(4) Bids shall be accompanied by a cashier's check, a certified check, or bidder's bond in an
amount equal to 10% of the bid, made payable to or for the benefit of (as the case may be) the City of
Vernon. Said check or bond shall be given as a guarantee that the bidder will enter into Contract No. CS-
0015, Vernon Avenue Storm Drain Trenchless Manhole -to -Manhole Pipe Linings & Sectional Linings
(Point Repairs) if awarded the work. The check or the bid bond may be forfeited to the City if the
successful bidder: (1) refuses or fails to execute the Contract within fifteen (15) calendar days after receipt of
written notice from the City that the Contract is ready for signature, or (2) refuses or fails to furnish the
required Contract bond and/or proof of insurance coverage within thirty (30) calendar days after the City has
provided written notice of award. If no bid is accepted by the City Council, or if the successful bidder
executes and delivers the necessary Contract Documents to the City, then the City will return all checks and
bonds received by it within ten (10) days after the execution of said Contract or within ten (10) days after
being requested to do so by the unsuccessful bidder.
(b) Before submitting a bid, bidders shall: read Contract No. CS-0015, Vernon Avenue Storm Drain
Trenchless Manhole -to -Manhole Pipe Linings & Sectional Linings (Point Repairs), especially the
Special Provisions, and all other Contract Documents with care; visit the site of the work, and; be fully
informed about all the existing conditions and limitations. The bidder should also be fully aware of the bond
and insurance requirements as to the successful bidder. The bid shall specify the amounts to cover the cost
of all items included in Contract No. CS-0015, Vernon Avenue Storm Drain Trenchless Manhole -.to
Manhole Pipe Linings &i Sectional Linings (Point Repairs) No allowance will be made because a bidder
failed to examine the Contract Documents or obtain the requisite knowledge about the project prior to
submitting its bid.
(c) Bids shall be seated in an envelope marked:
Contract No. CS-0015 Vernon Avenue Storm Drain Trenchless Manhole -to -Manhole Pipe Linings &
Sectional Linings (Point Repairs)
Bids shall be addressed to the City Clerk of the City and shall bear the name of the bidder. Bids shall be
delivered to the City Clerk on or before the day and hour for the opening of bids as set in the Notice Inviting
Sealed Proposals (Bids). It is the SOLE responsibility of the bidder to see that the bid is delivered and
received before the scheduled closing time for receipt of bids. Any bid received after the scheduled closing
time shall be returned to the bidder unopened.
(d) The City shall have a period of sixty (60) days after the opening of the bids within which to accept or
reject any or all of the bids.
5. Contract and Bonds
(a) The form of Contract that the successful bidder, as the Contractor, will be required to execute is
included in the Contract Documents, and should be examined by the bidder with care. The Contract, bonds
and other documents to be executed by the Contractor shall be executed in original triplicate stamped
according to law. One original shall be filed with the City and the others with the appropriate City
departments.
(b) At the time the Contract is executed, the successful bidder will be requited to furnish and. maintain
the following: (1) a Labor and Material Bond in an amount equal to 100% of the Contract price and (2) a
faithful Performance Bond in an amount equal to 100% of the Contract price. The bonds shall be secured
from a surety company that the City finds acceptable. The surety's name must be on file with the County
Clerk of Los Angeles County and/or the California Department of Insurance as an approved and financially
sound surety company, authorized to transact business in this state.
( The bonds shall meet all of the requirements and contain all of the conditions specified in Sections
3247 and 3248 inclusive, of the Civil Code, and other applicable provisions of the law and/or regulations of
the State of California.
B-2
(c) If the successful bidder fails to execute the Contract, file the required bonds, and/or file proof of
insurance coverage as required by the Contract Documents, the award of the Contract may be annulled by the
City and the bid bond forfeited.
6. Addenda
Any addenda issued before the time in which to submit bids expires, and included as a part of the
Contract Documents furnished to the bidder for preparation of its bid, shall be covered in the bid and shall be
a part of the Contract.
7. Withdrawal of Bid
Any bidder may withdraw its bid either personally or by a signed written request any time prior to
the scheduled time for opening of the bids (but not after).
8. Award or Rejection of Bids
The Contract will be awarded to the lowest responsible bidder complying with these instructions and
with the Notice Inviting Sealed Proposals (Bids). The City, however, reserves the right to reject any and all
bids or to waive any irregularities in bids received. If, in the judgment of the City, a bid contains prices for
the various items within the bid that appear to be unrealistically low, or if the bidder is not considered
responsible, the bid may be rejected.
9. Bidders Interested in More Than One Bid
No person, firm or corporation shall be allowed to make or file, or be interested in more than one bid
for the same work, unless alternative bids are permitted. A person, firm or corporation that has submitted a
subproposal to a bidder or quoted prices on material to a bidder, may submit a subproposal or quote prices to
other bidders.
10. Insurance and Financial Requirements
(a) Before entering into the Contract, the successful bidder shall furnish evidence that workers'
compensation insurance, public liability, property damage insurance, and all other insurance specified in the
insurance schedule set forth at pages E-7 and E-8 have been procured. The insurer must be an insurance
company admitted in and authorized to do business in California and maintain a rating that is acceptable to
the City. The insurance procured must be maintained in full force and effect for the entire duration of the
Contract.
(b) Before the Contract is awarded, any bidder upon request shall furnish a recent statement of said
bidder's financial condition and previous construction experience or such other evidence of the bidder's
qualifications, as maybe required by the City. If not previously provided to the. City, the successful bidder
shall furnish a recent statement of its financial condition and previous construction experience or such other
evidence of its qualifications before entering into the Contract.
11. Preliminary Estimate
The preliminary estimate of quantities of work to be done and material to be furnished, as shown in
the Contract Documents, are approximations and are given as a basis for the comparison of bids. The City
does not expressly, or by implication, agree that the actual amount of work will correspond with the
preliminary estimates. The City reserves the right to increase or decrease the quantity of any item or portion
of the work or to omit portions of the work, as it deems necessary or expedient. The successful bidder shall
not at any time after the submission of the bid have any claim for damages as a result of lowering of
anticipated profits or the loss of profits because of any difference between the quantities of work actually
B-3
done and those stated in its bidding sheets.
Each bid item should be priced to carry its pro-rata share of the costs, overhead and profit. Bidders
are cautioned against unbalancing their bid by including more than a pro-rata_share of overhead and profit in
any bid item.
12. Deductive Items
Attention should be paid to Deductive Bid Items. These items have been listed in the Bid Price
section of the Bid Form Proposal. All items will be totaled and included in the comparison of bids made by
the City. The City has the option of deducting the Deductive Bid Items from the total bid price prior to
awarding the Contract.
13. Tour of the Site
A tour of the site of the proposed work has been set for Tuesday, November 23. 2010.
The tour will start at the office of the Community Services & Water Department, City Hall, 4305
Santa Fe Avenue, Vernon, California at: 10:00 a.m.
14. Proiect Description
Contract No. CS-0015 involves cleaning, removal and disposal of debris, rock, soil, trash etc.,
CCTV the exiting pipes, cutting protruding (break in) lateral pipes from the existing 15" & 18" diameter
vitrified clay pipe (VCP), and furnish and install new pipe liners using Cured -In -Place Pipe (CIPP)
method at the following portion of the street manholes located in the City of Vernon, State of California.
(1) Vernon Avenue between Soto Street and Boyle Avenue.
• From Manhole No. 2 to Manhole No. 3 — 210 linear feet (15" diameter pipe).
• From Manhole No. 9 to Manhole No. 10 — 148 linear feet (18" diameter pipe).
The Contractor shall also perform sectional lining (point repair) on 10 sections of cracked pipes
along Vernon Avenue between Soto Street, Boyle Avenue and Alcoa Avenue. The new point repair liner
shall overlap at least one foot at both ends of cracked VCP pipe joints.
The existing pipes must be cleaned by hydro jetting to remove all debris, rock, soil, trash, tree roots,
etc. before CCTV. All portions of the protruding (break in) lateral pipes in the main storm drain line must be
cut off for clearance before installation of new liners. Existing lateral connections located within the lining
sections shall be cut open and trim the edges for reconnections after completion of the manhole -to -manhole
main liner and point repair liner installations. The Contractor shall CCTV lined sections of the pipes
(manhole to manhole and point repair) again and delivers 2 sets of DVD and hardcopy printouts to the City
for final approval.
The quantities of Bid Items may increase depending on the finding of proposed CCTV report
before lining.
B-4
15. Project Map
S'1'N
Od
�j
70 t--
m O
O
2 S�P�O U
• 'Y 00
O
Z
0
�e <
o HO
O
ti� o
mo
byyyj0�i w
O Z
m Z
O
N [V ¢
� F
Of
O N Of
w - OVO?J 1.3NM00 w Oanelv
_I
LJ
O 0
a 2 3nN3AV V001V
O L7
3nN3AV V001V
N m - w r o
z n z
v) > N u~ m
z 0
Z nN3A QZ = _ �AOG
A FS- Z
rii m F Z N g
�P� p > a w
m �
OJ a
J338is
1332f1S OlOS 133N1S Oi0s
a�G �oz W
O 2 2 3nN3AV 31IIA3S w -
Q rii ,ri M z w
z -
1131Ni1VH x N i ¢ OATH OIdIOVd o > U
F 2 z z 4
N N Z
VA83NIN K ro ~ O O
N M >
- 3nN3AV 3d V1NVS N
3nN3AV 33 V1NVS w
z
-
K N
O
N
m
N SS08 3 80 MVH
0
J3381S V03WVlV
— B-5 —
C. BID FORM PROPOSAL TO THE CITY OF VERNON
1. Proposal
WORK TO BE PERFORMED: Vernon Avenue Storm Drain Trenchless Manhole -to -Manhole
Pipe Linings & Sectional Linings (Point Repairs), Contract No
CS-0015
Name of Bidder:
Business Address:
Phone Number:
its+ackioy], o-F
Place of Residence: Q�`� V)
-Z350
U
G33 (e
The site of the work to be performed and referred to herein is in the County of Los Angeles, California.
The work to be performed will be in accordance with the specifications and Contract Documents of Contract
No. CS-0015.
TO THE CITY COUNCIL OF THE CITY OF VERNON:
.,. Pursuant to and in compliance with the Notice Inviting Sealed Proposals (Bids) and other documents
relating thereto, the undersigned bidder, having become familiar with the terms of the Contract, and the cost
of the work at the place where the work is to be done, hereby proposes and agrees to perform the Contract
within 30 working days after issuance of a "Notice to Proceed" or commencement of work, whichever
occurs first, including all of, its component parts and everything required to be performed, and to provide and
furnish any and all of the labor, material, tools, expendable equipment, and all utility and transportation
services necessary in order to perform the Contract and complete in a workmanlike manner all of the work
required as specified in Contract No. CS-0015, all in strict conformity with the plans and specifications and
other Contract Documents, including Addenda Numbers , and on file in the office of
the City Clerk.
The undersigned, as bidder, declares that the only persons or parties interested in this proposal as 11
principals are those named herein, and that this proposal is made without. collusion with any person, firm or
corporation. The bidder proposes and agrees that if this proposal is accepted, the bidder will execute a
Contract with the City that is in substantially the same form as the Contract set forth in the Contract
Documents.
- C-1 -
2. Bid Prices
The undersigned, as bidder, agrees that the bidder will accept in full payment thereof the following
lump sum and unit prices, to wit:
Perform all the work as specified herein and Special Provisions of Contract No. CS-0015.
The total bid price amount includes furnishing all labor, materials, equipment, mobilization, traffic
control, disposal of all removals, permits, fees, overhead, profit and taxes associated with the Contract No.
CS-0015 with all of the work in place and in working order according to the plan and specification.
Item No. 1
Remove, and dispose debris, trash, grease, soil etc. in the existing 15 ", 18" and 21" Vitrified Clay Pipe (VCP) by
hydro jetting before CCTV Video Camera Inspection, complete in place, approximately 2,798 linear feet at:
�J�� /Iia���✓Sy7 per linear foot
(words)
per linear foot
(figures)
s 7 55��
(figures)
Item No. 2
Perform CCTV Video Camera Inspection before installation of new liner in the existing 15", 18" and 21"
Vitrified Clay Pipe (VCP), complete in place, approximately 2,798 linear feet at:
per linear foot
(words)
per linear foot
(figures)
a (7 70
(figures)
Item No. 3
Cut off and dispose all portions of the protruding (break in) lateral pipes in the existing main line Vitrified Clay
Pipe (VCP),, complete in place, approximately 6 each at:
(words)
Joy,
(Figures)
each
each
$ 3o06,a
(figures)
C-2
Item No. 4
Furnish and install new liner in the existing 15" Vitrified Clay Pipe (VCP) (between manhole #2 to #3), complete
in place, approximately 210 linear feet at: /
r �n✓e /�f�a' %�/'ice �o/�S 2,4' C�� ✓ per linear foot
(words) 610
per linear foot
(figures)
(figures)
Item No. 5
Furnish and install new liner in the existing 18" Vitrified Clay Pipe (VCP) (between manhole #9 to #10),
complete in place, approximately 148 linear feet
//at:
per linear foot
CWurus)
(figures)
Item No. 6
per linear foot
23 ?a
(figures)
Furnish and install new sectional liner (point repair) in the existing 15" Vitrified Clay Pipe (VCP) at various
locations, complete in place, approximately (2 sectional lining X 10' each) 20 linear feet at:
"� �� A °� b (��✓� �` per linear foot
-rds)
per linear foot
(figures)
(figures)
Item No. 7
Furnish and install new sectional liner (point repair) in the existing 21" Vitrified Clay Pipe (VCP) at various
locations, complete in place, approximately (8 sectional lining X 10' each) 80 linear feet at:
per linear foot
(/ w rds)
per linear foot
(figures)
U�
(figures)
C-3
Item No. 8
Cut open in the newly installed pipe lining for reconnection with existing lateral pipe entrance opening, complete
in place, approximately 11 each at:
/ U,�9 l nip '� G��� ✓S ZP/31, '!mil
each
(words)
each
(figures)
(figures)
Item No. 9
Perform CCTV Video Camera Inspection. after installation of new liners in the existing 15 ", 18" and 21 " Vitrified
Clay Pipe (VCP) (only on the newly lined sections of the pipes) complete in place, approximately 1,000 linear
feet at:
V Ci per linear foot
/ (words)
�5v per linear foot
(figures)
Uv
Item No. 10
(figures)
Furnish and install Standard Construction Sign (4' X 6') per City of Vernon Std. Plan MV2217, complete in
place, approximately 2 each at:
✓� 1����✓G/)o�(�1C1 rs Z�i� �� each
words)
each
(figures)
1,1e��0.
(figures)
Total, Item Nos. 1 through 10 inclusive:
(figures)
It is understood that the foregoing quantities are approximate only and are solely for the purpose of
facilitating the comparison of bids, and that the Contractor's compensation will be computed upon the basis
of the actual quantities in the complete work, whether they be more or less than those shown.
C-4
3. Materials
The name and address of the manufacturer for each type of material upon which this proposal is
based is as follows:
co[(
3/S S
C-5
August, 2007
To Whom It May Concern:
Qualification & Process License Certification
Background
Applied Felts, Inc. is a fully owned subsidiary of Applied Felts Ltd, part of the Rawson Group, a large non-
woven textiles company. The Rawson Group was a key developer of CIPP technology beginning in 1974
and was the sole supplier of coated felt materials worldwide until the late 1980s. Applied Felts has
produced inversion tube installed by more than 300 contractors operating in more than 30 countries.
We can certify that these materials have been installed throughout the world in applications identical to
those proposed by SAK Construction with the total amount exceeding 40 Million linear feet, of which 25
Million linear feet has been successfully installed in the United States, all adhering to ASTM 1216.
SAK Construction and their inversion process is certified to install Applied Felts lining materials.
Applied Felts provides engineering support and technical assistance to its installers. Physical testing of
tensile and flexural strengths is performed with many different resin systems to insure compatibility.
Specifications
Applied Felts lining materials are made of polyester needle felt with the outside layer of the tube coated
with polyester polyurethane. Multiple layers of felt are constructed together to provide a wide range of liner
thickness.
Quality Control & Assurance
Applied Felts, Inc. is a certified ISO 9001:2000 manufacturer (see attached certificate) and all materials are
tested to ensure suitability to the various field applications. Each liner is typically tested in 28 different
ways. Detailed traceable test data is available for any particular liner.
David A. Fletcher
Applied Felts, Inc.
Applied Felts, Inc., 450 College Drive, Martinsville, VA 24112; Tel. (276)656-1904; Fax (276)656-1909 E-mail: appliedfelt@kimbanet.com
DESCRIPTION
A multiple layer felt liner with impermeable coating conforming to ASTM-1216.
APPLICATION
Installation Method:
Impregnation Method:
CURING METHODS
Resin Tvoe I f nntin
PVC
Vinyl Ester Polyurethane
PVC
E oxy Polyurethane
PVC
N/A= Not Applicable
N/R= Not Recommended
DIAMETER RANGE
THICKNESS RANGE
Inversion
Vacuum impregnation and pressure rollers
WarmWa ter < 50°C
Hot Water < 90°C
Steam < 110°C
Yes
Yes
Yes
Yes
N/A
N/A
N/A
Yes
Yes
N/A
N/A
N/A
Yes
Yes
Yes
Yes
N/R
N/R
AVAILABLE MANUFACTURED LENGTHS
Generally (6" to 80")
1.5mm. to 100mm
Any length made to order
This Product Information sheet gives general information. Exact coating type
and thickness will depend on the specific types of resin being used.
Please contact our Technical Team for specific advice.
450 College Drive, Martinsville, Virginia 24112 (P) 276-656-1904 (F) 276-656-1909 office@appliedfelts.com
4. Subcontractors
The bidder as general contractor hereby identifies the subcontractors on the job for each particular
trade or subdivision of the work with each firm name and principal location of the mill, shop or office when
the value of the work, labor or service performed is in excess of one-half of one percent of the total bid. The
- -- - — -- --bidder agrees that there shall be no substitution of subcontracting except upon compliance with the
"Subletting and Subcontractors Fair Practices Act" (Public Contract Code Sections 4100, et seq.).
(Instruction: List only one subcontractor for each such portion.)
DIVISION OF
PRINCIPAL
WORK OR TRADE
NAME OF FIRM OR CORPORATION LOCATION
C-6
5. Deposit of Security
ACCOMPANYING THIS PROPOSAL is ?)-I
words "Cashier's Check", "Certified Check", or "Bidder's Bond") in an amount equal to ten (insert
the
the total of the bid, payable to or for the benefit of the City (as the case may be),
forfeited to the City as liquidated damages in case this bid proposal
The undersigned deposits the required security as a bid proposal guarantee and agrees that it shall be
undersigned fails to execute the Contract. is accepted by the City, and the
6. Bonds
The undersigned agrees to provide the City with a Performance Bond and Labor and Material Bond
in the form set forth in the Contract Documents within seven (7) calendar days after the date of mailing of
the acceptance. The surety will be one that the City finds acceptable,
7• Withdrawal
The bidder acknowledges that it may withdraw its bid either personally or by a signed written
request any time prior to the scheduled time for opening of the bids. Once the bids are opened, the bidder
agrees that its bid will not be withdrawn for a period of sixty (60) days after the time set for the opening
thereof.
Principals
The names of all persons interested in this Bid Proposal as principals are as follows:
C--7
THE AMERICAN INSTITUTE OF ARCHITECTS
AIA Document A310
Bid Bond
KNOW ALL MEN BY THESE PRESENTS, THAT WE SAK Construction of CA, LP
103 N. Cool Springs Road, O'Fallon MO 63366
as Principal, hereinafter called the Principal, and Safeco Insurance Company of America
1001 4th Ave., Ste. 1700 Attn: Surety Claims Dept Seattle WA 98154
a corporation duly organized under the laws of the State of
as Surety, hereinafter called the Surety, are held and firmly bound unto
of Vernon
WA
4305 Santa Fe Avenue, Vernon, CA 90058
as Obligee, hereinafter called the Obligee, in the sum of Ten Percent of Amount Bid
Dollars ($ 10% )
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for Contract No. SC-0015 Trenchless manhole -to -manhole pipe linings
sectional linings (point repairs)
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt
payment of labor and materials furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise
to remain in full force and effect.
Signed and sealed this 3rd
S4eveGlvI+ee.--Sec-r-4 (Witness)
day of
December
SAK Co
Safec InsuancVCon
LP
of America
omas Bean
AIA DOCUMENT A310 • BID BOND • AIA • FEBRUARY 1970 ED. • THE AMERICAN
INSTITUTE OF ARCHITECTS,1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006
10'10
(Seal)
(Title)
(Seal)
ACKNOWLEDGEMENT FOR PRINCIPAL
ACKNOWLEDGEMENT FOR PRINCIPAL IF LIMITED PARTNERSHIP
STATE OF (WI SSO�j I }
COUNTY OF 7A. Cc IDS }
ON THE -7 T* DAY OF WAe C a D Ib BEFORE ME PERSONALLY
APPEARED 4J TO ME KNOWN AND KNOWN TO ME TO BE THE
V la — E'L eol . OF SAK CONSTRUCTION OF CA, LP, A LIMITED
PARTNERSHIP, DESCRIBED IN AND WHO EXECUTED THE FOREGOING
INSTRUMENT AND ACKNOWLEDGED TO ME THAT (S)HE EXECUTED THE
FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT (S)HE
EXECUTED THE SAME AS AND FOR THE ACT AND DEED OF SAID LIMITED
PARTNERSHIP.
Notary Public
Troy Thoma
Notary Public Notary Seal
State of Missouri County ofWarren
My Commission Expires 1211112011
Commission # 07410273
-THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 4195997
This Power of Attorney limits the sets of those named herein, and they have no authority to bind the Company except in the manner and to the extent
herein stated:
i SAFECO INSURANCE COMPANY OF AMERICA
l SEATTLE, WASHINGTON
POWER OF ATTORNEY
KNOW ALL PERSONS BY THESE PRESENTS; That Safeco Insurance Company of America (the "Company'), a Washington stock insurance company,
pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint THOMAS BEAN;
SUSAN LUPSKI, GERARD S. MACHOLZ, CAMILLE MAITLAND, ROBERT T. PEARSON, RITA SAGISTANO, GEORGE O. BREWSTER,
COLETTE R. CHISHOLM, ALL OF THE CITY OF GARDEN CITY, STATE OF NEW YORK...................................................................
.................................................................................................................................................
each individually if there be more than one named, its true and lawful attorney -in -fact to make, execute, seal, acknowledge and deliver, for and on its behalf as
surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding
THREE HUNDRED MILLION AND 00/100** ***-**DOLLARS ($ 300,000,000.00***k*********** ******) each, and the execution of such
undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed
by the president and attestedbythe secretary of the Company in their own proper persons.
That this power is made and executed pursuant to and by authority of the following By-law and Authorization:
tv
+% ARTICLE IV - Execution of Contracts: Section 12. Surety Bonds and Undertakings.
y
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitations d
CL as the Chairman or the President may prescribe, shall appoint such attorneys -in -fact, as may be necessary to act in behalf of the Corporation to make, c
execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -in- w
�e N fact, subject to the limitations set forth in their respective powers !of attorney, shall have full, power to bind the Corporation by their signature and
4; executed, such instruments shall be as binding as if signed by the president and attested by the secretary.ca
>,
C
co
L By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys -in -fact: _ G
� M
L tm Pursuant to Article IV, Section 12 of the By-laws, Garnet W. Elliott, Assistant Secretary of Safeco Insurance Company of America, is authorized to v
•� _ appoint such attorneys -in -fact as maybe necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety AW any and all undertakings, bonds, recognizances and other surety obligations. C
O>
That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. OQ'
41r .O
a Cl)
Ali V WITNESS WHEREOF, this Power of Attorney_ has been subscribed by an authorized officer or official of the Company and the corporate seal of
ov
O : ifeco. nsurance Company of America has been affixed thereto in Plymouth Meeting, Pennsylvania this 21 St day of October
L 2010
d O M
ems; R SAFECO INSURANCE COMPANY OF AMERICA a.w
vyco
' Garnet W. Elliott, Assistant Secretary O.
�
a>+ � COMMONWEALTH OF PENNSYLVANIA ss �����c O
COUNTY OF MONTGOMERY
On this __21 St day of October 201:0 before me, a Notary Public, personally came Garnet W. Elliott, to me known, and G
d'kh
'a 8+ acknowledged that he is an Assistant Secretary of Safeco insurance Company of America; that he knows the seal of said corporation; and that he:
O c. executed the above Power of Attorney and affixed the corporate seal of .Safeco Insurance Company of America thereto with the authorityand . at the
40, . direction of said corporation..N.
M
Z v. 1N TESTIMONY'WHERE05egi o subscribed my name and affixed my notarial seal at Plymouth Meeting; Pennsylvania, on the day and year O
first above written.
���,r � TiruszP ut t Sohn t$if�i�c /`r ~ r
F crr !r i t F +r na S rur €} By —
MY CO 1,ss c EXPIr Mar. la ac 1 Tere Pastella, Notary Public
CERTIFICATE �, ���' _ �riti,rrur,'srraslo.iriiaAus�iui>i�t'n%a( 1.,tar.es
I, the undersigned, Ass is �r Safeco Insurance Company of America, do hereby certify that the original power of attorney of which the
foregoing is a full, true and c spy, is In full force and effect on the date of this certificate; and f do further certify that the officer or official who
executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys -in -fact as
provided in Article IV; Section 12 of the By-laws of Safeco Insurance Company of America.
This certificate and the above -power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the
following vote of the board of directors of Safeco Insurance Company of America at a meeting duly called and held on the 18th day of September, 2009.
VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wIvrever appearing upon a certified
{ copy of any power of attorney issued bythe company in connection with surety bonds, shall be valid and binding upon the company with the
l same force and effect as though manually affixed.
IN TESTIMONY :WHERE;OF I have hereunto subscribed my na e ns #'xed the corporate seal of the said company, this Mb _day of
DEGEI�Elt -0� 0 :cx�t
,rrn Davi M. Carey Astant Secretary
ACKNOWLEDGMENT OF SURETY COMPANY
STATE OF ....... New. York. } ss
COUNTY OF ...Rassau....... }
December 3, 2010
On this ................................ before me personally came..: Thomas, l3wn
to me know, who, being by me duly sworn, did depose and say; that he/she resides in
Suffolk county ,State of. New York that he/she is the Attorney -In -Fact of the
..Safeco....
lrisurarice Company.Americathe corporation described in which
executed the above instrument; that he/she knows the seal of said corporation; that the
seal affixed to said instrument is such corporate seal; that is was so affixed by order of
the Board of Directors of said corporation; and that he/she signed his/her name thereto by
like order; and the affiant did further depose and say that the Superintendent of Insurance
of the State of New York, has, pursuant to Section 1111 of the Insurance Law of the State
of New York, issued to ... Safeco Insurance Company of America (Surety) his/her
....................
certificate of qualification evidencing the qualification of said Company and its
sufficiency under any law of the State of New York as surety and guarantor, and the
propriety of accepting and approving it as such; and that such certificate has not been
revoked.
GRACE ACKERSON
Notary Public, State of iVew York
No. 01AC611 Ls90
Qualified in Nassau County
Commission Expires June 14, 2012
NY acknowledgment
{
............ ....
of Public
hnnli ;a,perrry, frX the •p+nr ;f11jf of Ib¢ Salem Inrurnnco.Cou"y of Anrria
ASSETS
,
hM idlr,,upd
- (
------------___..----------------___..._-----
i �sds
flcn,�uiCstl
Assets
Asses
� fJCIAun�Let1
-. _.
I t3-t (khecbL D) - —
--.—.
ICah1 2)
.
Iasels
2 Shx1c5 (Sdseduk D): - -I 2alB, ,TOd.83i
_
21 Prefer slodcs
,2.928.2M,234
2:Jo7,'t55,7{7
.. .
%1 ViSI1tI�1Nl SU]005 � . -. 53,J•)1.8�
1 h'afanc k+.ns rn 127
rcz!�i=��.cr:.. 1,ern.. _
53JU9.3CQ
127,E71;2°I.
94 d28 I
3.1 Foal liens -
167,103,551
.
12 OV1a than 6ral (Ohs
-
4 Re,7 eua& .. ..
... -
.. ..
41 Properie5 oal;lpad by Co oknparty (ls S
.
0 encun2ranccl)
42 Prq-- hdd la 11, pnt t -,, d mane4-1 (less S
�
0 gxuadN axxz)
pmpe"Jes tm_d for Sale ;lean $
p aic'urbwces)
.. .
5 Cxh(S 123,139997,SchodulcE-Pasl1),cassequiva's15(S5,:c17,,af2, ..
�•"`
.....
StlnxWp P-
E 2). aid shor orm inves"mts (S 1,9,333,1�. S }x d0p DA
6. Ccnvanbansfndudin�5 )
.
r
.-..8,4Fb,3
UPrefrvumnaes)
7. Cthcritted ..
asscl5 (Sc't�u,e EA)
-
-
A RecFiv:"eifors1G3a003
:. ..
�8,5^
!6,615
34683, ,
!0 Subtaals, cash and Irnesred ussels (lines I l0 4) ... . .. - .. - �
-
It. YltzdanLSleSs5 cbWgd od .. .. .. 3.647.414,i09
7Z lr'Ymm m �tntne' due and a=,)Rd (for Tide ineumrs only) ...
.. 1.,U0$131t1
'
3§4fi.4D3,!OA
.?,�51,??1,Ila
1J. Armatru acsd WnBdetafi0ils: - - - . - . - .... ..... J8.227338
-....
.. 38.7R,5S9
.. -
- 34,037,369
erniufns era aJenls' f�'a!ze3 in Use course of Wlbv ow
13.2 Uncalecl
f32 DA.fejredorc:nlumy,agents'b2iaticesandirWalYnenLstcokedboldeferred •, ......Bo1
mm
.9.55),506
_00.221,355
280,T7u,AS6
3Ad nd yei do (isduding g (i0.781, Z eanfed twi unbifetl gti;nuins)
-
13.3 AcaL'Id eVOWM*mpfernlunu 971.si5,?�0
.... 125.54�
4.27AJf,?J3
276,167757
14. R&u4;rance: ..
. , .... r
-
770,6C6
14,1 Ahoonl5 tecrweraNe frnnt r�tltlfQlS
• • ..
...... _
142 Funds tsdJ by of rlepox(er{ vi#t rehsswed utmPanles .... . .... . ....... .
..... . .....
a1,16P,230
265,224,7-08
amuse Is kw vab}e U ddf 7dn`tlre fCE 0at1(aGts
1S AmoUnLSrxe;oablA
118,512
relnWsg to unisu0red plea
. ...... .... ............
16.1 Comt kdefal afsd fXt4n Income lax 7amrer3ble and c U i9] dwmcl
. ........
...., . ...
....
..... - -
f 61 Net tl5� tea a55rd .. .
........
.. .
fl. GuaraAty,'undshSceNableer� :....:. ........... . _.....
dCtXl�l .
. , , ,137,151,,?�U
iQ1,839,8i0
18. E�t}rq>;cdaia 2,81-0,0
i5. Filnsrulre atx! pf 0cessx19 evupment and sdt>rere
�N P nefY lnekxliny hwA ewe dof ' . ...1!•ba6,Ai5
...
20. Net 3dµrstrn°trtinaxmtsand liatzii6csdo'W"n s .. ....0) .-.._ .....�;b97,51b
exchmgetates
21. RecenraWesfront p;>;ent,w ifiariesatidaff�., . ............
22 Hea1C cam {� n . ...... . - . !,bf0
}UodWhenamowtsYc IvatSe_
23 AOeNate vrJgllr for When
i, '
OGd
.......:.:..
......16616..
.... s,45;,r3z
Can Inmsted at" .....
24. Taal3 mism�dutYmgSa,sy tAxtuh'a.Sc9fs9atedluxia:ntsand . .,.... _ .. 21,157.J7]
_
8?S1.064
.....12,916319
..,.2.282,575
Prdeded CA Aaaunls (Utley to 2�
4 FmmSaP3r',,teAm;,urb,Segre;7�A000cnLvandP. � .... ....: 4.501,?2i,155 ..
sWedrrl Cr91 A,ocounts
.113,920.&11
3.952.?38,208
26 Tdat (U t24 and 251
,..4.�27,{61.57aI
MAIL$ OF WRITE4N LINES
R�01,
0.°Ol ...-......:.
5.:4'fM:1Ny Df scmranG191NfteanS for'.►i41 'c "&-arBoW—Pago ..- ..., . •. , ..
. Tdtds 0°01 OgiXi us 0998' e B aka - • .. , ...... .
fY1, aher assets
2W2. CashSwmderVah*'LfeInsurance : 9:9i5.,.. 6,2Si,fa4
....
2305 Egrs-add d"(t5ip pods and ins �81J,?yB B,B13.6 9 ?r?a?s
2 N8 Slmma y of tertsa 0aig wrBe ins fa Une 23 hen . _ ........ �M 3j¢ 3.00&3r
??93 TaafsfLkfes.2301ihranhr4m�n.rhxmm�,._,,, .... .
" "' "'% "1" 1- 1— Al, -Jo' 'w! Ya*4 I r4tronca qompiAy M Awd,,
LIABILITIES, SURPLUS AND OTHER FUNDS
------ ---- -------
Qmjy�
...-cy Y&T
I. LN o ;r! 2A :x-4 Cd m a
11,11 Zk. W- Full 1,113 3-d 61 &djj-- t juud (Wr-*.k F. fe. I. co'". 6)
71,
4, br;M"rd (crpb.�, � 5*rnj =_m ;_ X-d dW I
k.W s,m
aewitd t.W.'y
13-T.Md 'w� and twum I
9. UXMWKWAAT4 (Pod V, U(* A pvnlra kmd
Of I M
mvi-,
N �'
Rk)ftfj,.
1d rvd, f.11 bya�.
ik.
4.
Is P-.
. ... ......
...
. . ... ......
ollb
..... ........
PaKrlohpker4 5VAVAi!j V —
. . . .
A. P*% ... ..... . ... ..
.. ....
....
h. thh'kl I%
.. ... ............
'22- (>PM fom I .........
. ......
. ...
. . . .
.. .....
....... ........
.........
....................
2i, Tow 'g4k4 M-Npwcvd C814&um "I ttrmh 23)
--------
15a 6-97
F16W104 0,A k%bka
'2:5j
...........
T0Wa*MM(UlM2lland
........ ......... ....
. ..... .. .... ..
. .....
. ..... ........... ..... .... ...... . ...
W" lixk
ow
— ...... .. .
......
&... .........
"pw Mi., .. ..... ...... .....
........ ....
..............
......
mi. qb-1 . . . j , ... ........ ........ ... .... .. . . ... .....
....
......
.
.......
.... ... ...... .... . . ............
MAIO .
............
... . ....... .... .
......... irVw- .
... ........
........ . WA1,40d h lyric 2114
. . .......� lr-,.w liq Uro 20;
VU4 pjceojY' (Lh- V us u, hu 341 fpsoe 4. Lv;a X)
Min,437
owl-
..................................... . .... ...... ..
...................... . ..... .....
:23A
. ....... .......... ...... .. .....
W'wm
..........
. ............
......................... lawm ............. ......
..........
........... . .............
............
...... ...... ..." ..........
............ I
uru9vs as
. ...... .... ............ ........ .
... ..... ..... .. .... .......... .
......... . ..... ........... .. .....
........................ ..... .. I ......... 11 ... .....
W.M. qm
eh
VN
ftyk"l
9. License and Signature
The undersigned is licensed in accordance with California Business and Professions Code, License
No. - � Cl GI S S i\ — "101A Coc 4y-&-c -&)-<
Name of bidder: Cc�iS-�i
Signature of bidder:
Title:
Dated:
1,21 1 1 1 ho
NOTE: The complete and proper legal name of the bidder shall be set forth above. If the bidder is a
corporation, two signatures are required, as follows: (1) the Mayor of the board, the president, or any vice-
president, and (2) the corporate City Clerk, any assistant corporate City Clerk, the chief financial officer, or
any assistant treasurer. If the bidder is a limited liability company, signatures are required of two members
or managers unless otherwise provided in the company's articles of organization. If the bidder is a
partnership, signatures are required of the partner or partners authorized to sign contracts on behalf of the
partnership.
C-8
'
Local Office
National Headquarters
Jerry Shaw
SAK
13405Telegraph Road
103 North Cool Springs Rd.
President
Unit #407
O'Fallon, MO 63366
CONSTRUCTION CA LP
Whittier, CA 90605
636.379.2350 telephone
Ro holder
562-225,7224 telephone
636.379.2461 fax
Vice CChairman
Chairman
PIPE REHABIUTATION AND
TUNNEL CONTRACTOR
866.542,7134 fax
www.sak-construction,com
Tom Kalishman
Chairman
October 7th,
2010
To Whom It May Concern:
Boyd Hirtz, Mice President, and General Manager of our CIPP Division is hereby
authorized to sign bids, extend offers, submit proposals and execute contracts on
behalf of SAK Construction of CA, LP.
Je ome P. Shaw
President
SAK Construction of CA, LP
State of Missouri) _
County of St. Charles)
On this 7th day of October, in the year 2010, before me, Troy Bradshaw,
a notary public, personally appeared, Jerome P. Shaw, proved on the basis
of satisfactory evidence to be the person whose name is subscribed to this
instrument, and acknowledged he executed the same. Witness my hand and
official seal.
NOTARY PUBLIC
Troy Thomas Bradshaw
Notary Public Notary Seat
State of Missouri County of Warren
My Commission Expires 12/1112011 SEAL
Commission # 07410273
An Equal Opportunity Employer
10. Bidder's Qualifications
The Bidder must have a minimum of five (5) years of experience as an ongoing business enterprise in the
specific type of work indicated in the proposal.
The following contracts which show experience in work of similar scope to that covered in the proposal
and which have been satisfactorily completed in the past five (5) years are:
YEAR NAME OF FIRM AND ENGINEER
LOCATION
&vi-,to
CONTRACT AMOUNT
The Bidder, as a contractor, has never failed to satisfactorily complete an awarded contract, except as
follows:
I declare under penalty of perjury, under the laws of the State of California, that the foregoing is true and
correct. Executed at S A V Cohs }roc+ion on this ??" day of Decen; be 2-oi k:
2010.
By:
Name: 41 4W�4
C-9
SA K
CONSTRUCTION OF CA LP
PIPE REHABILITATION AND
TUNNEL CONTRACTOR
National Headquarters I Jerry Shaw
103 North Cool Springs Rd. I President
O'Fallon, NU 63366 I RobertAflholder
636.379.2350 telephone
636.379,2461 fox > ce Chairman
wanvsakccm5tcoin I Tom Kalishman
Chairman
SAK Construction, LLC (CA LP) (SAK) is a company formed in January 2006, comprised of an experienced
team, well-known in both the pipeline rehabilitation and tunneling industries. Our core pipeline
rehabilitation focus is cured -in -place pipe (CIPP). Although a relatively new entity, SAK possesses the
experience, expertise, and resources to operate a successful construction company, executing pipeline
rehabilitation and tunneling work to the satisfaction of our customers.
Company Headquarters
Our 21,905 square -foot headquarters and CIPP wet -out facility are located near St. Louis, Missouri,
approximately 20 miles west on 1-70 from Lambert St. Louis Airport. The address and contact
information is:
SAK Construction, LLC (CA LP)
103'North Cool Springs Road
O'Fallon, Missouri 63366
Capabilities
• Cured -in -place pipe lining —6" to 96" diameter
• Tunneling — 4 foot diameter to 32 foot arch
• Large Diameter Sliplining (36" pipe and above)
• Shaft Excavation
• Shotcreting, Grouting and Crack Sealing
• Sewer Cleaning
• CCTV Inspection
• Laser Profiling
• Water Main Rehabilitation
Bonding Capacity
(636)379-2350 Telephone
(636)379-2461 Fax
SAK Construction has a minimum of $70,000,000 bonding capacity through Liberty Mutual Insurance
Licenses (where reauired
Alabama
42995
Arizona
246314
Arkansas
0194570309
California
917811 (SAK Construction of CA LP)
Florida
CUC1224641 (d/b/a Missouri SAK Construction, LLC)
Georgia
UC301933
Louisiana
49267
Nevada
0071272
South Carolina
G114041
Tennessee
00061862
Utah
7280543-5551
Virginia
2705 126032A
An Equal Opportunity Employer
N ot Headquarters
Jerry Shaw
SAK
103 NNorth Cool Springs Rd.
President
C)'Pallon, MO 63366
CONSTRUCTION OF CA LP
636.379.2350 telephone
RobertAflholder
636.379.2461 (cz
Vice Chairmon
PIPE REHA81UTATIONAN6 TUNNEL CONTR -TOR
vrvw,sakcorntcom
Tom Kalishman
Chapman
Management and KeV Personnel/Experience
Tom Kalishman —Chairman
• Board of Directors, Insituform Technologies, Inc. (ITI) from 1998 to 2005.
• President of United Pipeline Systems (ITI subsidiary) in 1998.
® Director of East Regions, ITI from 1997 to 1998. A business unit with annual revenues exceeding
$150 million.
® General Manager Southeast Region ITI from 1996 to 1997.
• Operations Manager Southeast Region ITI from 1994 to 1996.
• MBA Northwestern University; Evanston, IL.
• BS in Economics, Wharton School at the University of Pennsylvania (Magna cum Laude).
Jerry Shaw — President
• 30 years experience in the tunnel and pipeline rehabilitation industry.
• Vice President of Affholder, Inc. (ITI tunneling subsidiary) for 18 years from 1987 to 2005.
• Responsible for day to day management of a $25 million tunneling business which grew to
become a $120 million tunneling business unit.
• Project manager of various tunnel projects 1983 to 1987.
• BS Business Administration, Southwest Missouri State University (now Missouri St. Univ.).
Robert Affholder —Vice Chairman
• Board of Directors and Executive Vice President, Insituform Technologies, Inc. 1995 to 2005.
• Board of Directors and President, Insituform Mid -America from 1986 to 1995.
• Formed Affholder, Inc. in 1968 to compete in the tunneling industry. Purchased first Insituform
franchise in 1982, and took the company public as Insituform Mid -America, with Affholder, Inc.
and six (6) Insituform franchise territories becoming wholly owned subsidiaries, Company
revenues exceeded $125 million.
• 1996 Trenchless Technology Person -of -the -Year.
• 1995 key facilitator of merger between Insituform Mid -America. and Insituform Technologies,
Inc., resulting in his being put in charge of all North American contracting for the corporation,
• President ofAffholder, Inc. from 1968 to 2002.
Jackie Lynch —Safety Director
• 33 years experience working as a safety manager for firms such as Affholder, Inc. and
Insituform, and joined SAK as Safety Director in May 2009.
• Extensive training with OSHA guidelines, has Confined Space Training and Certification.
An Egaal Opportunity Employer
SA K
CONSTRUCTION OF CA LP
PIPE REHANUTATION AND
TUNNEL CONTRACTOR
l,atlonel Headquarters I Jerry Shaw
103 North Cool Sprirgs Rd, I President
O'Pallon, MO 63366
636.379.2350 telephone RobertAfiholder
636.379.2461 fox I
Vice Chairman
vnvwsa const.com I Tom Kalishman
Chairman
• Jackie has designed, built, and implemented safety programs and training for both tunneling and
CIPP installation crews.
• Mine Safety and Health Administration Certification
• Occupational Safety and Health Administration Certification
• American Red Cross First Aid / CPR (CPR Instructor)
• Member American Society of Safety Engineers
• National Association of Safety Professionals (Certified Safety Manager)
Boyd Hirtz — Vice President and General Manager, CIPP Division
• 22 plus years in the CIPP and tunneling industries.
• Area Manager for Affholder, Inc. (ITI subsidiary) from 2003 to 2006
• General Manager/Vice President for Insituform Technologies, Inc. from 1997 to 2002.
• Responsible for all day to day operations for central Midwest for projects ranging; in size up to
$8 million, with annual central Midwest revenues of$35 million.
• CIPP operations and project management.
• BS in Civil Engineering from University of Missouri -Rolla.
• Professional Engineer registered in the State of Missouri.
Steve Hirtz —Vice President Rehab Operations
• 25 years experience in the tunneling and pipeline rehabilitation industry
• General Manager for Mid America Pipe Services from November 2007 to May 2009. Responsible
for the day to day operations of the pipeline cleaning, CCTV Inspection and Assessment work
done by the Company's crews.
• Director of Field Operations for Insituform Technologies, Inc. from June 2004 to November
2007. Responsible for North American Field Operations of 65 crews producing $300 million in
revenue annually.
• Senior Operations Manager for Insituform Technologies West Coast Operations from March
2000 to June 2004. Responsible for day to day field operations for the West Coast based in
Benecia CA.
• Operations Manager for Insituform Technologies/Insituform Mid -America from March 1990 to
March 2000. Responsible for the day to day field operations for the Midwest based in
Chesterfield MO.
• Superintendent for Insituform Mid -America from 1985 to March 1990. Directly managed pipe
rehabilitation crews in the Midwest.
Steve Stulce —Chief Financial Officer
• 15 years experience in the tunneling and pipeline rehabilitation industry.
• Business Unit Controller for Maverick Tube, Inc. from May 2005 to 2007.
An Equai Opporwnity Empfoyer
SAK
CONSTRUCTION OF CA LP
PIPE REHABILITArION.AND
TUNNEL CONTRA -TOR
National Headquarters I Jerry Shaw
103 North Cool Sprirg Rd, I President
O'Fallon, MO 63366
636.379.2350 telephone RoberLAfiholder
636.379.2461 fax I vice Chairman
wwwsakconsl com Tom Kallshman
Chairman
• Managed all financial aspects of an $800 million business unit of a steel pipe manufacturer with
total annual sales of $1.6 billion.
• Business Unit Controller for Affholder, Inc. from 1999 to 2005. Senior management role with
responsibilities for budgeting, forecasting, cash flow, payables, and receivables.
• BS in Accounting from the University of Missouri -Columbia.
• Member, Certified Public Accountants
Casey Smith —Area Manager, West
• 15 years experience in the CIPP industry. Joined SAK during September 2008.
• Director of Construction Operations, Torrent Resources, Inc. — Phoenix, AZ; August 2006 to
September 2008.
• District General Manager, Insituform Technologies, Inc. — Phoenix, AZ; September 2004 to
August 2006. Profit & loss responsibilities for a $37mm/year business unit.
• Lead negotiator on $111mm in construction contracts during a 4 year period. Reviewed and
approved all estimates and bids.
• Project Executive, Insituform Technologies, Inc. — Phoenix, AZ; August 2002 to September 2004.
• Managed Insituform's 2003 Project of the Year in Phoenix, with the scope including the CIPP
rehabilitation of 10,200 feet of 90" RCP, 120mgd bypass, cleaning, manhole rehab and traffic
control in 72 days with a contract value of $10.2mm.
• Director of Operations - Europe, Insituform Technologies, Inc..- Paris; Sept. 1999 to July 2002.
• Training Manager, Insituform Technologies, Inc. — September 1997 to September 1999.
• Designed and built $1mm Corporate Training Center in St. Louis, MO. Created, structured and
implemented centralized, companywide training program. Trained 250 people per year.
• Senior Project Engineer, Insituform Technologies, Inc. — Memphis, TN and St. Louis, MO; May
1992 to August 1997.
• BS in Civil Engineering, Southern Methodist University; Dallas, TX
James Byrd — Senior Project Manager, Tunneling
• 30 plus years experience in the tunneling industry.
• Area Manager for Affhol'der, Inc. from 2003 to 2006.
• Responsibility for performance on multiple tunneling projects ranging in size up to $70 million.
• Project Manager for Aff holder, Inc. from 2000 to 2003. Responsible for management and
construction of soft ground & hard rock tunnels ranging in size from $500,000 to $22 million.
• Superintendent for Seven K Construction from 1995 to 2000.
• BS in Civil Engineering, Texas A&M University.
Jeff Oberhofer— General Superintendent
• Joined SAK in June 2008
An Equal OpportaoityEmpfoyer
National Headquarters Jerry Shaw
SAK 103 North Cool SpriV Rd, President
O'rallon, MO 63366
CONSTRUCTION OF CA LP 636.379,2350 telephone RobertANholder
636.379.29bi (ox Vice Chornnan
PIPE NFL C LI TRACTOR wwwsakcomtcom Tom Kallshman
TUNNi=L CONTRACTOR
Chairman
• 24 years experience in the pipeline rehabilitation industry with CIPP.
® Operations Manager for Insituform Technologies, Inc. based in Phoenix, AZ 2007 to 2008.
• Responsible for crews operating for Insituform in Arizona, Nevada, and Southern California.
• General Superintendent for Insituform Technologies, Inc. based in Phoenix, AZ 2001 to 2007.
• Extensive large diameter CIPP pipe rehabilitation operations management, as well as extensive
experience in bypassing sanitary sewer flow in conjunction with these operations.
• Began as_a laborer with Insituform in 1984 and progressed in achieving increasing levels of
responsibility until he became a General Superintendent in the late 1990's.
Jason Laney — CIPP Superintendent/installer
• 12 years experience in the pipeline rehabilitation industry with CIPP.
• Superintendent/Installer for Insituform Technologies,;lnc. from 2001 to 2007.
• Responsible for crew's daily operations on projects throughout the Midwest.
• Foreman for Insituform Technologies, Inc. from 1999 to 2001.
• Crew member for Insituform Technologies, Inc. from 1996 to 1999, duties included TV
Technician and Lateral Lining Foreman.
• Supervisor experience installing 6- to 72-inch diameter CIPP.
• Foreman/Crew Member on the 2002 Trenchless Technology Project of the Year— Phoenix Salt
River Outfall CIPP.
Jeff Hirtz — CIPP Superintendent/Installer
• 12 plus years experience in the pipeline rehabilitation industry with CIPP.
• Superintendent/Installer for Insituform Technologies, Inc. from 2004 to 2007.
• Supervisor experience installing 6- to 84-inch diameter CIPP.
• Responsible for crew's daily operations on projects throughout the Midwest.
• Shop/Wet-Out Foreman for Insituform Technologies, Inc. from 1996 to 2004.
Troy Bradshaw — Lead Estimator, Tunneling
• Senior Estimator for Aff holder, Inc, from 2004 to 2007,
• Special Projects Superintendent for Affholder, Inc. from 2002 to 2004.
• Estimator and Scheduler for S.A. Healy from 2000 to 2002.
• Estimator for Kiewit Underground from 1999 to 2000.
• Tunnel Superintendent for Kiewit Underground from 1998 to 1999.
• Worked in various positions from a tunnel miner through the Superintendents role for various
companies from 1978 to 1998.
An Equal Opportunity Employer
N Headquarters
Jerry Shaw
SAK
103 North Cool Springs Rd.
President
O'rallon, MO 63366
CONSTRUCTION OF CA LP
636,379.2350 te1 h
op. one
Roechairm oldee
636.379.2461 fox
Vice ChoimSun
N HABILITATION AND
TUNNEL
TUNa�IEL CONTRACTOR
v ww.;akconst.com
Tom Kalishman
Chairman
Charlie Kuhnmuench — Vice President Business Development
• 10 years experience developing business and working with clients on solutions minimizing
surface disruption in the CIPP pipeline rehabilitation industry. Joined SAK in January 2008.
• Vice President Hanneke Hardware & Industrial Supply from May 2005 to September 2007.
• Responsible for leadership of business development team & marketing for a multi -store
hardware and industrial supply business, serving the St. Louis construction market.
• Global VP Business Development & Marketing for Insituform Technologies, Inc., June 2004 to
May 2005. Responsible for the leadership, strategic communication and skill development of
the domestic and international sales and marketing staff comprised of 68 people.
• Director of Sales & Marketing, Insituform Technologies, Inc. from January 2002 to June 2004.
.• Director of Strategic Accounts, Insituform Technologies, Inc. from January 2001 to January 2002.
• Central Region Sales Manager, Insituform Technologies, Inc. from January 1999 to January 2001.
• Technical Sales Representative, Insituform Technologies, Inc. from March 1997 to January 1999.
• BS in Business Administration, University of Missouri; Columbia, MID
Gordon Marshall — Business Development
• Joined SAK in August 2008.
• 19 years experience in the CIPP pipeline rehabilitation industry understanding issues and
problems municipalities have with underground infrastructure and finding solutions.
• Business Development Manager, AUI, LLC from May 2007 to August 2008. Responsible for
developing business in the Southeast for a regional supplier of SSES type work for Municipalities.
• Vice President Business Development & Training, MBDi (Mastering Business Development, Inc)
from April 2006 to May 2007. Grew the business through cold calling and asking existing clients
about issues they face in growing their business through their BD force, then leading their
training in process and system.
• Area Director Business Development, Insituform Technologies, Inc. from August 2003 to April
2006. Responsible for revenue and margin growth, also the leadership, training and
development of the southeastern sales team.
• Technical Sales Representative, Insituform Technologies, Inc. August 1986 to August 2003.
Joe Huffman — Business Development
Joined SAK in November 2008, and is responsible for Business Development in central and.
western Missouri and eastern Kansas.
17 years experience in the CIPP pipeline rehabilitation industry working with municipal clients,
consulting engineers and contracting partners to fix underground infrastructure problems faced
by municipalities.
An Equal Opportunity Employer
SA
CONSTRUCTION OF CA LP
PIPE REHABILITATION AND
TUNNEL CONTRACTOR
National Headquarters I Jerry Shaw
103 North Cool Springs Rd, I President
OTallon, MO 63366
636.379.2350 telephone RobertAfiholder
636.379.2161 fox ice C airman
mvwsakconstcom I Tom Kalishman
Chairman
• From July 2007 through October 2008 served as Business Development Manager for TREKK
Design Group, TREKK provides comprehensive services for evaluation, condition assessment,
diagnosis and rehabilitation of sanitary and combined sewer systems.
• Business Development Manager for Insituform Technologies, Inc. from July 1990 to April 2007.
• Insituform Salesman of the Year for North American Division in 1997, 1998, 1999, 2000, 2001,
2004 & 2005.
• Member of the Missouri Water Environment Association (MWEA), Kansas Water Environment
Association (KWEA), and American Public Works Association. Received the Golden Manhole
Award from MWEA in 2602 and from KWEA in 2001.
• President of the Engineers' Club of Kansas City 1996-1997.
Tim Bussen — Project Engineer
• Joined SAK in September 2007.
• Estimator and Engineer responsibilities for projects throughout the Midwest U.S.
• Responsibilities include jobsite surveys, project estimating, workload forecasting, bid
preparation, submittals, project scheduling and project closeouts, and communication with
client representatives throughout the project cycle.
• Several years of field experience in hard -rock, soft -ground, and mixed -face tunneling with
Affholder, Inc. as a laborer, and in CIPP pipeline rehabilitation as a Field Engineer with Insituform
Technologies, Inc. —St. Louis, MO.
• B.S. in Construction Management - Missouri State University.
Cory Street — Project Engineer
• Joined SAK in July 2008.
• Estimator and project manager responsibilities for CIPP projects in the Southwest U.S. for SAK.
• Responsibilities include jobsite surveys, project estimating, workload forecasting, bid
preparation, submittals, and project scheduling and project closeouts.
• 4 years experience in pipeline rehabilitation, specifically CIPP.
• Experience includes various positions including laborer, field engineer, and project manager for
Insituform Technologies, Inc.
• B.S. in Construction Management from the Ira A. Fulton School of Engineering —Arizona State
University.
An Equal Opportunity Employe
SA K
CONSTRUCTION OF CA LP
PIPE REHABILMATIONAND
TIUMMEL CONTRA -TOR
Trenchless Experience
National Headquarters I Jerry Shaw
103 North Cool Springs Rd. I President
07allon, MO 63366
636.379.2350 telephone RobertAfiholder
636.379.2461 (r,;x I
VICE chaitmon
a vwsakconstcom I Tom Kalishman
Chairman
SAK key personnel have installed millions of linear feet of cured -in -place pipe, and managed the
installation of tens of millions of linear feet of cured -in -place pipe. SAK Construction, LLC is a relatively
new entity, but our personnel are among the most experienced and well-known in the industry.
Having formed the original Affholder company in 1968, Robert Affholder (SAK Vice Chairman) and Jerry
Kalishman (SAK Chairman Tom Kalishman's father) purchased their first Insituform license in 1982. They
subsequently bought five (5) additional licensees for a total of six (6) licensed geographies: Insituform
Missouri, Insituform Central, Insituform Plains, Insituform Texark, Insituform Rockies, and Insituform
Southeast. This combined company, Insituform Mid -America, grew to become the world's leading
installer of Insituform, with sales of $107 million in 1995 representing more than 40% of the total sales
for Insituform Technologies, Inc. worldwide. Jerry Shaw (SAK President) and Boyd Hirtz (SAK Vice
President and General Manager) were both employed and heavily involved throughout this time as
installers and project engineers. In October 1995, the merger of Insituform Mid -America, Inc. and
Insituform Technologies, Inc. was completed. This put Bob Affholder in charge of all North American
contracting for the corporation, Jerry Shaw became Vice President of Affholder, Inc. (tunneling) and
Boyd Hirtz became a Vice President and General Manager in the central Midwest for Insituform (CIPP).
Two of our Installers/Superintendents, Jeff Hirtz and Jason Laney, have been employed in the CIPP
industry since each joined Insituform in 1996. Jeff Hirtz worked in a shop labor role before eventually
managing the wet -out (resin impregnation of the dry felt tubes) for the central Midwest, and then
becoming a Superintendent/Installer from 2004 to 2007. Jason Laney was initially a crew member,
before becoming a Foreman on a crew in 1999, and ultimately a Superintendent/Installer from 2001 to
2007. During these time frames they have each been involved in the installation of hundreds of
thousands of feet of cured -in -place pipe. We were fortunate to have them join SAK in late 2007.
Steve Hirtz recently joined SAK as Vice President of Rehab Operations. He is responsible for all Cleaning,
CCTV, and CIPP Field Operations. As shown above Steve has been in the industry for 25 years holding
positions from Superintendent to General Manager to Director. He has been responsible for CIPP
installations from 4 inches in diameter to 96 inches in diameter. He has also managed projects with
extensive CCTV inspection work as well as bypass pumping systems that were designed to pump in
excess of 220 MGD.
Jeff Oberhofer is a General Superintendent for SAK based in Phoenix, Arizona, responsible for our CIPP
installation operations in the Western and Southwestern U.S. He started in the industry with Insituform
in 1984 in Chicago, Illinois, moved to Phoenix in 2001 as a General Superintendent, and became
Operations Manager in late 2007. We were fortunate Jeff decided to join SAK in June 2008, and bring
his 24 years of CIPP operations experience to our team.
An Eyivl Opponunity €mployer
SA
CONSTRUCTION OF CA LP
PIPE REHABILITATION AND
TUNNEL CONTRACTOR
National Headquarters I Jerry Shaw
103 North Cool Spdags Rd, I President
07allon, MO 63366
636.379.2350telephone RobertAftholcler
636.379.2461 fox I
vice chairman
Y vWmsakcomtcom Tom Kalishman
Chairman
As an organization our people have seen and done it with cured -in -place pipe. Working for municipal,
private, military/government, and industrial clients installing cured -in -place pipe in sanitary and storm
sewers of various materials, shapes and diameters from 6 inches to 96 inches.
CIPP Liner Materials
SAK provides a CIPP product that is a proven technology. We utilize AquaCureTM_ Coated Felt Inversion
Liner manufactured by Applied Felts, Inc., who, with its parent company, Rawson Textiles, has provided
polymer coated felt tubes for use in the CIPP lining industry for more than twenty (20) years. Applied
Felts is a registered ISO 9001:2000 company which has produced CIPP tube installed by more than 300
contractors operating in more than 30 countries. More than 60 million linear feet of Applied Felts
product has been installed worldwide, of which 35 million linear feet has been successfully installed in
the United States. Applied Felts was the sole supplier of coated felt materials worldwide until the late
1980s, when Insituform Technologies, Inc. began manufacturing their own coated felt CIPP tubes.
SAK Construction, LLC (CA LP)is certified by Applied Felts to install their lining materials, follows their
recommended installation procedures, and Applied Felts provides engineering support and technical
assistance to its installers. Accompanying this document is a Qualification & Process License
Certification from Applied Felts, Inc. for SAK Construction, LLC, along with literature on Applied Felts'
AquaCureT"^, and a copy of Applied Felts ISO 9001:2000 Certificate of Registration.
SAK utilizes cured -in -place pipe resins manufactured by AOC and Interplastic leaders in the CIPP resin
industry, and registered ISO 9001:2000 companies. The third party test results supporting the short-
term and long-term performance of the resin products we install are available upon request.
SAK installs cured -in -place pipe in accordance with ASTM F1216 for inversion and curing.
Ao f quol pppoaunity Employer
I_ r
SAK CONSTRUCTION PROJECTS LIST AS OF DECEMBER 1, 2009
Job #
Owner
Contact Name & Telephone
Type
Contract Amount
Total Footage
Percent Com fete
Footage Com let
- 1000
Village of Godfrey, IL
Dennis Hartman; Village of Godfrey
Tremont Subdivision Sewer CIPP Repair
618/466-4319
Wastewater
$49,588.00
1612
100%
1612
1001
City of Carbondale, IL
Gary Belles, City of Carbondale
Sanitary Sewer Rehab at Eason Dr.
618/549-5302
Wastewater
$127,901.00
3430
100%
3430
City of Osawatomie, KS
1002
2007 Sanitary Sewer Impprovements
Kris Bates; Bates Utility Co.
636/939-5628
Wastewater
$834,552.00
37242
100%
37242
sub to Bates Utility Co.
-
MSD St. Louis
1003
Grand Avenue Sewer Rehabilitation
Dan Laughlin; 0.1. Laughling Plumbing
sub to O.J. Laughlin Plumbing Co.
636/225-0992
Wastewater
$21,250.00
250
100%
250
1004
City of Mt. Olive, IL
Jesse Maynard, E.I.; HMG Engineers
Sewer Rehabilitation
618/596-3711
Wastewater
$15G,510.00
4319
100%
4319
1005
City of Lincoln/Lancaster County, NE
_ Roger Kmll; City of Lincoln, NE
Rehab of Sanitary Sewers by Liner Insertion
402/441-7985
Wastewater
$111,035.00
4603
100%
4603
1006
Buccaneer Bay SID No. 5; Cass County, NE
Lucas Billesbach, E.I.; JEO Consulting Group
2007 Sanitary Sewer Improvements
402/934-4850
Wastewater
$88,934.00
2896
100%
2896
1007
City of Davenport, IA
Brian Schmidt; City of Davenport, IA
2008 Sanitary Sewer Lining Program
563/327-5156
Wastewater
$456,142.00
17408
100%
17408
1009
City of Jefferson, MO
Eric Seaman, P.E.; City of Jefferson, MO
Basin 17 Rehabilitation
573/634-6443
Wastewater
$1,807,450.00
34458
100%
34458
City of Phoenix, A2-Peel. 4108J00062
1010
Sm. Diam San. Sewer Rehab -JOA 1,2, & 3
Dan Broderick; Achen-Gardner Engineering, LLC
Wastewater
$1,514,016.00
49136
sub to Achen-Gardner Engineering
480/940-1300
100%
49136
1011
City of Pipestone, MIN
Scot teddy, P.E.; Banner Associates, Inc.
Pipestone Sanitary Sewer Lining 2008
60S/692-6342
Wastewater
$262,452.00
10402
100%
10402
Paducah -McCracken Joint Sewer Agency
1012
Contract No. 4 Wastewater Collection System
John Hodges, Paducah -McCracken JSA
Wastewater
$534,632.00
12332
Rehabilitation
270/575-0056
100%
12332
Little Rock Wastewater Utility (AR)
1013
Jimmerson Creek Rehabilitation
Kouresh Malek; Building & Utility Contractors
sub to Building &Utility Contractors
501/397-2594
Wastewater
$99,036.00
3837
100%
3837
1014
City of St. Paul, MN
Patrick Lowry, City of St. Paul
-
Biglow/Bush Sewer Rehabilitation
651/266-6251
Wastewater
$1,334,314.00
34711
100%
34711
lots
City of Waterloo, IL
Jesse Maynard, E.I.; HMG Engineers
Waterloo 24" Sewer Rehabilitation
618/596-3711
Wastewater
- $23,450.00
370
100%
370
1016
City of Waverly, NE
Justin Stine; JEO Consulting Group
2008 Sanitary Sewer Sliplining Improvements
4021435-4110
Wastewater
$88,948.00
317G
100%
3176
City of Scottsdale, AZ
1017
8-inch CIPP Rehabilitation
Chuck Watkins; Western Waterworks Contracting
Western Waterworks Contracting
623/879-7420
Wastewater
$5,452.00
150
100%
150
City of Phoenix, AZ-JOC 99th Ave.
1018
Interceptor Sewer Siphon Improvements
Nick Mason; Quest Civil Constructors, Inc.
Wastewater
$127,238.00
ZJ6
sub to Quest Civil Constructors
602/725-6286
100%
276
Pima County, AZ- Roger Road Tx, Plant
1019
24-inch CIPP Rehab 'AirLine
Scott Gossford; Quest Civil Constructors, Inc.
sub to Quest Civil Constructors
520/887-6011
Wastewater
$155,175.00
750-
100%
750
City of Pevely, MO
1020
Sanitary Sewer Rehabilitation
Jeff Huck, P.E.; Cochran
Wastewater
$265,531.00
6924
Landmark Mobile Home Park
636/584-0540
100%
6924
1021
City of Baldwin, IL
Travis Liefer, Rhutasel and Associates
Sanitary Sewer Call. System Rehab
618/532-1992
Wastewater
$249,940.00
11321
100%
11321
1022
Little Rock Wastewater Utility (AR)
Keith Brown; LittleRockWastewater Utility
Large Diameter Sewer Rehabilitation
501/223-1520
Wastewater
$518,920.00
3450
100%
3450
MAWSS (Mobile, AL)
1023
Rehab of Sewers by Lining & Abandonment In Orange
Gary Tillman; Burk-Kleinpeter, Inc.
Grove/Hope VI Area
251/342-3888
Wastewater
$657,431.00
5311
100%
5311
1025
City of Granite City, It
Steve Osborn; Juneau Associates, Inc.
Nameoki Area Manhole & Sewer Rehab
618/877-1400
Wastewater
$1,297,853.00
22364
100%
22364
Little Rock Wastewater Utility (AR)
-
1026
Allsop Rehabilitation
Kouresh Malek; Building & Utility Contractors
sub to Building& Utili Contractors
501/397-2594
Wastewater
$627,980.00
9449
100%
9449
1027
City of St. Paul, MN
Patrick Lowry; City of 5t. Paul
Euclid/Edgewater Sewer Lining
653/266-6251
Wastewater
$1,328,571.00
32260
100%
32260
1028
Boone County (MO) Regional Sewer District
Andy Lister; Boone Co. Regional Sewer District
Sunrise Estates Sewer Rehabilitation
573/441-0210
Wastewater
$507,831.00
17142
100%
17142
Little Rock Wastewater Utility (AR)
1029
Trenchless Sewer Line Rehabilitation
Keith Brown; Little Rock Wastewater Utility
Annual Contract 4 Renewals
501/223-1520
Wastewater
$350,033.00
9349
100%
9349
City of Phoenix, AZ- COP Proj. 4108J00062
030
Sm. Diam Sam. Sewer Rehab -JOA 4
Dan Broderick; Achen-Gardner Engineering, LLC
Wastewater
$604,580.00
sub to Achen-Gardner Engineering
480/940-1300
19014
100%
19014
1031
MSD St. Louis
Ron Moore; MSD St. Louis
Infrastructure Repairs FY2009 Ph. 11
314/768-6388
Wastewater
$4,898,000.00
225087
95%
213833
SAK CONSTRUCTION PROJECTS LIST AS OF DECEMBER 1, 2009
Job fi
Owner City and County of Denver, CO
Contact Name & Telephone
Type
Contract Amount
Total Foota a
Percent Com fete
Footage Com let
' 1032
2008 WMD Annual Sanitary Sewer
Chuck Hart; City & County of Denver, CO
Wastewater
-
$2,358,526.00
119654
,.-
{
Improvements-ontract No. CE80829
303/446-3641
100%
119854
University of Arkansas Medical Center
1033
CIPP Lining at UA Mad Center
Mickey Reese; Arkansas Cleaning & Televising
Wastewater
$80,000.00
819
sub to Arkansas Cleanin & Televising
501/687-1610
100%
819
MSD St. Louis
1034
CIPP Rehab Express Scripts Campus
Collette Hermann Koscielski; Clayco, Inc.
Wastewater
$18,601.00
400
sub to Clayco, Inc.
314/592-2173
100%
400
1035
City of El Dorado, KS -
Kurt Bookout; City of El Dorado, KS
CIPP Rehabilitation
316/321-9100
Wastewater
$177,783.00
7059
100%
7059
City of Peoria, AZ
1036
Northern & 91A Emergency Repair
Nick Mason; Quest Civil Constructors, Inc.
Civil
602/725-6286
Wastewater
$259,405.00
901
100%
901
Quest Constructors, Inc.
MSD St. Louis
1037
DC-09 Sanitary Relief (SKME-655)
- Ron Moore; MSD St. Louis
Wastewater
$862,659.00
28414
Separate Sewer Area I Reduction 900019C
314/768-6388
100%
28414
1038
Marshall (MO) Municipal Utilities
Monte Chase; Marshall Municipal Utilities
Proposal a7-09-UF Sewer Rehab
660/886-6966
Wastewater
$23,039.00
575
100%
575
City of Phoenix, AZ-Proj. 4108J00062
1040
Sm. Diam. Sanitary Sewer Rehab JOA 6
Dan Broderick; Achen-Gardner Engineering, LLC
Wastewater
$387,893.00
sub to Achen-Gardner En ineerin
480/940-1300
11305
100%
11305
1041
Seacoast Utility. Authority (FL) -
Keith Haas; Seacoast Utility Authority
Annual Gravity Sewer Rehab using CIPP
561/627-2900
Wastewater
$540,662.00
9597
100%
9597
1042
Sunburst Farms Irrigation Water Delivery Dist.
Sunburst Farms; Glendale, AZ
Improvements to Sunburst Farms
602/938-8760
Irrigation Water
$175,000.00
2750
100%
2750
City of Phoenix, AZ- Proj. 4108J00062
1043
Sm. Diam San. Sewer Rehab -JOA 7
Dan Broderick; Achen-Gardner Engineering, LLC
sub to Achen-Gardner Engineering
480/940-1300
Wastewater
$528,877.00
16628
100%
16628
City of Phoenix, AZ- Proj. 4108J00062
1044
Sm. Diam. San. Sewer Rehab -JOA 8
Dan Broderick; Achen-Gardner Engineering, LLC
Wastewater
$466,518.00
15827
sub to Achen-Gardner Engineering
480/940-1300
300%
15827
City of Phoenix, AZ-Proj. 4108J00062
1045
Sm. Diam. San. Sewer Rehab -JOA 9
Dan Broderick; Achen-Gardner Engineering, LLC
sub to Achen-Gardner
480/940-1300 1
Wastewater
$313,096.00
8801
100%
8801
Engineering
1048
Johnson County (KS) Wastewater
Joe Barnes; Johnson Co. Wastewater
- CIPP Term &Supply Contract
913/715-8636
Wastewater
$533,072.00
22181
100%
22181
-
City of Peoria, AZ
-
-049
Northern: 83rd to 91st -CIPP of 24"
Nick Mason; Quest Civil Constructors, Inc.
to Quest Civil Constructors,
Wastewater astewater
$315,311.00
5121
100%
5121
sub Inc.
t
Olathe, KS
1050
2009 Sanitary Sewer Maintenance
Ric Gere; Olathe, KS
P.N. 1-C-075-09, Contract
913/971-9119
Wastewater
$263,304.00
9919
100%
9914
1051
Unified Government of Wyandotte Co., KS
John Menkhus; Unified Govt. of Wyandotte Co, KS
NSRP Trenchless Sewer Repairs
- 913/573-5700
Wastewater
$106,624.00
478
100%
478
City of Las Vegas, NV
1052
- Brush Street Project
Joe Pescio; Contri Construction Co.
sub to Contri Const. Co.
702/458-6004 -
Wastewater
$113,552.00
1027
100%
1027
City of Phoenix, AZ- Proj. 4108J00062
1053
Sm. Diam. San. Sewer Rehab-JOA 10
.Dan Broderick; Achen-Gardner Engineering, LLC
-
Achen-Gardner Engineering
480/940-1300
Wastewater
$481,549.00
15846
100%
15846
-
1054
City of Clinton, MO
Cliff -Jordan; City of Clinton, MO
2009 Sanitary Sewer Repairs (CIP)
660/885-6611
Wastewater
$125,968.00
10670
100%
10670
1055
Camden Water Utilities (AR)
David Richardson; Camden Water Utilities
CIPP Rehabilitation of 15"
870/836-7331
Wastewater
$81,321.00
1525
100%
1525
1056
Village of Brighton, IL
.
8" CIPP Sewer Rehab
Tim Ferguson; Village of Brighton
Wastewater
$25,255.00
925
100%
925
City of Scottsdale, AZ
1057
Indian School Rd -CIPP of 24" SRP
Brian Froelich; Achen-Gardner Engineering, LLC
sub to Achen-Gardner Engineering
602/376-0103
Wastewater
$59,245.00
374
100%
374
.City of Peoria, AZ
-
1058
Northern: 91st to 99th - CIPP of 36"
Nick Mason; quest Civil Constructors, Inc.
sub to quest Civil Constructors
602/725-6286
Wastewater
$475,615.00
4051
100%
4051
1059
City of St. Paul, MN
Patrick Lowry; City of St. Paul
Greenbrier/Lawson CIPP Sewer Lining Project
651/266-6251
Wastewater
$1,382,893.00
6812
100%
6812
1060
MSD St. Louis.
Kris Bates; Bates Utility Co.
48" CIPP as sub to Bates Utility Co.
636/939-5628
Wastewater
$35,000.00
100
100%
100
lOfil
Metro Wastewater Reclamation District (CO)
Matthew Duncan; Metro Wastewater Red. Dist.
PAR 1112- Interceptor Rehab 2009
303/286-3422
Wastewater
$2,684,285.00
12281
100%
12281
1062
Yavapal-Apache Nation (AZ)
Ken Fitzgerald; Sr. Field Engr, Indian Health Services
Sewerline Replacement Proj. WA 05-09
480/592-0091 ext. 237
Wastewater
$262,920.00
6000
100%
6000
063
Marysville, KS
RickShan, City Administrator; Marysville, KS
Sanitary Sewer Rehab Project 2009
785/562-5331
Wastewater
$57,696.00
2514
100%
2514
City of St. Joseph, MO
1064
Cretex Concrete 36" CIPP
Steve Rowland, Cretex Concrete Products Midwest;
sub to Cretex Concrete
913/422-3634
Wastewater
$105,656,00
- 707
100%
707
SAK CONSTRUCTION PROJECTS LIST AS OF DECEMBER 1, 2009
.�
Job ft
Owner
- 1065
City of St. Joseph, MO
CIPP Project
1066
BNSF Railroad, Newton, KS
sub to Kissick Construction Co.
City of Melbourne, FL
1067
DB Lee Water Reclamation Plant
50 LF of42" Diameter CIPP
1068
City of Belton, MO
CIPP Lining
City of Lincoln/Lancaster County, NE
1069
2008/09 Rehabilitation of Sanitary Sewer by Liner
Insertion
1070
City of Jefferson, MO
Basin 16 Rehabilitation
1072
Salt Lake City Suburban Sanitary District #1 (UT)
CIP Line Rehabilitation 2009-2010
1074
City of Vermillion, SD
Vermillion Sanitary Sewer Improvements
Gary Leftin, City of StJoseph, MO
816/271-4948
Wastewater
$530,988.00
4387
100%
4387
Kissick; Kissick Construction Company 816/363
5530
Wastewater
$61,945:00
483
100%
483
_ Mike Brink; City of Melbourne, FIL
-.
321/255-4617
Wastewater
$30,000.00
50
100%
50
Dennis Hudson; City of Belton, MO
816/331-7789
Wastewater
$181,805.00
4703
100%
4703
Brian Kramer; City of Lincoln, NE
402/441-7985
Wastewater
$401,772.00
16926
100%
16926
Eric Seaman, P.E.; City of Jefferson, MO
573/634-6443
Wastewater
$1,300,546.00
65379
100%
65379
Don Telford, P.E.; SLCSSD 91
801/262-2904
Wastewater
$526,552.00
12786
100%
12786
Scott Mohror, P.E.; Banner Associates, Inc.
fins/rgl.fiaa�
Wastewater
$962,395.00
17g6R
innoi
1075
Village of Albers, IL
Jesse Maynard, E.I., HMG Engineers
Sewer Lining
618/596-3711
Wastewater
$36,374.00
1580
100%
1580
1076
City of Spring Hill, KS
Julie Parker, Ponzer-Youngquist Engineers
Sanitary Sewer Improvements
913/782-0541
Wastewater
$145,295.00
5072
100%
5072
Village of Palm Springs, FL
1077
CIPP Lining of 8" Sanitary Sewer Line on Purdy Lane a
Bill Davis, Village of Palm Springs, FL
Rue Road
561 965-5770
/
Wastewater
- $11,864.00
382
100%
382
1078
City of Maryville, MO
'Eric Lance, City of Maryville, MO
CIPP Lining of 10" Diameter Sanitary Sewer Line
660/562-3713
Wastewater
$17,468.00
507
100%
507
City of Eldon, MO
1079
Collection System Improvements in Miller Co.
Luke Hake, Stockman Construction Corp.
sub to Stockman Construction Corp-
573/635-1316
Wastewater
$31,697.00
1280
100%
1280
City of Live Oak, FL
1080
Live Oak Sewer Rehabilitation
Troy Freed, WRS Compass
Sub to WRS Compass
989/213-4408
Wastewater
$1,420,247.00
36500 -
100%
36500
1081
City of Pittsburg, KS
Bruce D. Remsberg, P.E.; Professional Engineering Consultants
Sanitary Sewer Line Repair Project l
P.A. 620/235-0195
Wastewater
$631,276.00
21785
100%
21785
1082
City of Shawnee, KS
Kenny Khongmaly, City of5hawnee, K5
"
Storm Sewer Rehab
913/742-6232
Stormwater
$23,935.00
165
100%
165
City of O'Fallon, MO
1094
Walmart O'Fallon 8" CIPP
Buddy Hulbert, Weis Builders
sub to Weis Builders
- 612/802-1702
Wastewater
$13, 635.00
203
100%
203
1085
Galesburg, IL
Steve Bmner, Bmner, Cooper & Zuck
Galesburg -Sewer Improvements
309/343-9282
Wastewater
$249,054.00
3471
100%
3471
1086
City of Lee's Summit, MO
Ryan Ratcliff,, City of tee's Summit, MO
CIPP Rehabilitation 2010
- 816/969-1900
Wastewater
$224,849.00
8503
100%
8503
City of Grain Valley, MO
1087
Grain Valley Sewer Rehabilitation
Cliff Cate, P.E.; TREKK Design Group, LLC
sub to TREKK Design Group, LLC
816/874-4659
Wastewater
$59,68S.00
2300
100%
2300
1088
Salt River Project (SRP); Phoenix, AZ
Dave Kiefer, SRP
SRP -67th Avenue & Northern
602/809-1371
Irrigation Water
$621,248-00
1660
100%.
1660
1089
Price Development Group, Kansas City, MO
tY
Monte Wendler; Price Development Group
Riverstone Apartments 8-inch line
816/268-5880
Wastewater
$11,000.00
200
100%
200
1090
County Sanitation Districts of Los Angeles
Mike Tatalovich; CSD of Los Angeles
Los Coyotes Interceptor Sewer Rehabilitation, Phase
562/908-4288 ext. 1623
Wastewater
$10,430,145,00
10505
85%
8929
1091
Unified Government of Wyandotte Co., KS
John Menkhus; Unified Govt. of Wyandotte Co., KS
2009 Trenchless Rehab
913/573-5700
Wastewater
$274,472.00
9791
100%
9791
1093
Salt River Project (SRP); Phoenix, AZ _
Dave Kiefer; SRP
SRP-Country Club & University
602/809-1371
Irrigation Water
$94,228.00
440
100%
440
City of Tempe, AZ
1099
Southern Ave. Interceptor Rehab, Phase II
Darr Broderick; Achen-Gardner Engineering, LLC
sub to Achen-Gardner Engineering, ILLC
480/940-1300
Wastewater
$5,088,745.00
18269
100%
18269
City and County of Denver, CO
1101
2009 Sanitary Master Plan
Rick Zimmat; City & County of Denver
Improvements - Contract No. CE90667
303/446-3718
Wastewater
$3,055,074.00
69191
45%
_
31136
1102
Chillicothe Municipal Utilities
Dick Rhodes; Rhodes Engineering Co., Inc.
Chillicothe, MO
660/258-7745
Wastewater
$1,485,000.00
36006
20%
7201
01 /
MSD St. Louis
Ron Moore; MSD St. Louis
102
Infrastructure Repairs FY2010 Phase A
314/768-6388
Wastewater
$4,827,637.00
131384
15%
19708
80201 / MSD St. Louis
Ron Moore; MSD St. Louis
80202 Infrastructure Repairs FY2010
314/768-6388
Wastewater 1
$5,278,533.00
156111
20%
31222
4
r
SAK CONSTRUCTION PROJECTS LIST AS OF DECEMBER 1, 2009
-. Job p
Owner
Contact Name & Tele hone
Type
Contract Amount
Total Footage
Percent Com fete
Foota a Com let
- ' 1106
City of Blue Springs, MO
Rodney Jones; City of Blue Springs, MO
2010 Sewer Rehabilitation
816/228-0195
Wastewater
$252,972.00
14728
100%
14728
City of Warsaw, MO
1110
Sanitary Sewer. Repairs
- Doug Adrian; J.C. Industries, Inc
573/636-2711
Wastewater
$52,914.00
21010
100%
21010
Subcontractor to J.C. Industries, Inc.
In
1111
Salt River Project (SRP); Phoenix, A2
Dave Kiefer; SRP
-
SRP Main & Stapley
602/809-1371
Irrigation Water
$118,451.00
598
100%
598
City of West Palm Beach, FL
1112
Monroe Drive Utility Improvements
Howard Wight; Char Equipment
_
Subcontractor to Chaz Equipment
561/333-2109
Wastewater
$87,000.00
-
200
100%
200
1113
City of Boynton Beach, FL
Tony Lombardi; City of Boynton Beach
CIPP Lining of 10" Diameter Sewer
561/742-6421
Wastewater
$4,151.00
138
100%
138
1114
Kansas City, MO Water Services Dept,
Matt Thomas; Kansas City, MO Water Services Dept.
"
Line Creek Sewer Rehabilitation
816/513-0306
Wastewater
$1,484,000.00
6307
20%
1261
1115
City of Lakeland, FL
Drew Adcock; City of Lakeland - Water Utilities
Sewer Rehabilitation
863/834-6704
Wastewater
$480,486.00
15532
100%
15532
-111G
HHP Corporation (for City of Tampa, FL)
- Ron Wilkes; HHP Corporation
MacDlll & Kathleen Road 14" CIPP
941/256-6072
Wastewater
$22,091.00
256
100%
256
1122
City of Gladstone, MO
Bryan Maddux; City of Gladstone
2010 Sanitary Sewer Rehabilitation
816/423-4155
Wastewater
$246,245.00
11429
100%
11429
1125
Lake City, FL
Thomas Henry; Lake City, FL
Sewer Rehabilitation
386/758-5400
Wastewater
$42,984.00
2096
100%
2096
1126
Sanitation District No. 1, Ft. Wright, KY
Rich McGillis; Sanitation Dist. No. 1
Newport Pavilion
859/547-1642
Wastewater
$282,000.00
500
0%
0
Octavio Sosa, Kansas City, KS
1127
Parking Lot Development Project
Jose Angel Martinez, Architect
Wastewater
$9,975.00
214
1414 Central Ave., Kansas City, KS 66102
913/825-3700
100%
214
Wal-Mart, O'Fallon, MO
1128
Subcontractor to Bommarito Construction
Joe Bommarito; Bommarito. Construction
Wastewater
$7,900.00
SO
SO if of8-inch CIPP
314/353-0104
100%
50
1129
City of Cherry Hills Village, CO
Kathy McKune; City of Cherry Hills Village, CO
CIPP Sewer Line Repair
303/762-.8222
Wastewater
$30,975.00
1050
100%
1050
1130
City of San Juan Capistrano, CA
Joe. Mankawich; City of San Juan Capistrano, CA
Hydraulic Capacity Project 1
949/487-4313
Wastewater
$658,075.00
9840
85%
8364
1131,
City of Madison, IL
Steve Osborn; Juneau Associates, Inc.
"
Emergency 24" CIPP Meechum Crossing
61S/877-1400
Wastewater
$32,731.00
192
100%
192
1132
Little Rock Wastewater Utility (AR)
Keith Brown; Little Rock Wastewater Utility
Tamarack Pines Condominiums, Proj. p 4091600
501/223-1500
Wastewater
$54,375.00
935
100%
935
1134
Granger -Hunter Improvement District (UT)
Brad Paxman, P.E.; Granger -Hunter Improvement Dist.
-
"
District lOH Sewer Rehabilitation Project
801/968-3551
Wastewater
$491,310.00
11368
90%
10231
1135
Urbana& Champaign Sanitary District(IL)
Christine Childress; Sodemann & Associates
2011 Interceptor Rehabilitation
217/352-7688
Wastewater
$478,000.00
6492
75%
4869
" 1136
Baxmeyer Construction, Inc.
Dave Baxmeyer, Baxmeyer Construction, Inc.
"
I.D.O.T. Contract 1176633 Madison County, IL
618/939-3000 ext. 19
Wastewater
$268,249.00
2203
40%
881
Paducah -McCracken Joint Sewer Agency
1137
Contract No. 6 Wastewater Collection System
John Hodges; Paducah -McCracken JSA
Wastewater
$1,086,969.00
31253
Rehabilitation
270/575-0056
75%
23440
1138
Palm Beach State College; Lake Worth, FL
Doug Todd; Fastrack MCI
8-inch Sewer ClPP Rehabilitation
561/304-7881
Wastewater
$112,750,00
4100
100%
4100
1140
Central Missouri Professional Services (MO)
Mike Bates; Central Mo. Professional Services, Inc.
1CPS 8-inch Sewer Rehabilitation
573/634-3455
Wastewater
$14,210.00
926
100%
926
City of Phoenix; Az COP Proj. PW590500115
1142
JOA #021 PVC Lined Concrete S.S. Rehabilitation
Dan Broderick; Achen-Gardner Engineering, LLC
sub to Achen-Gardner Engineering, L.LC
480/940-1300
Wastewater
$57,889.00
125
100%
125
1143
- Budrovich Excavating & Grading
Kurt Dulle; Budrovich Excavating & Grading
Edward Jones Campus 30-inch Sewer CIPP
314/892-4666
Wastewater
$32,502.00
705
100%
705
1144
City of Riverside (CA) Public Works
Lonny Young, P.E.; City of Riverside
Canyon Crest Sewer Rehabilitation
951/826-5294
Wastewater
$70,730.00
410
100%
410
1145 -
Kansas Dept. of Health & Environment (KS)
Randy Carlson; KS Dept. of Health & Environment
Emergency CIPP 8-inch Sanitary Sewer Lining -
785/296-1678
Wastewater
$25,1%00
777
100%.
777
Total Foota a Contracted/Defined
$76,938,618,00
1687906
1362734
1' s
11. Contractor's Acknowledeement of Insurance Requirements
The Contractor acknowledges that the Insurance Schedule contained in section "E" has been
reviewed, that a copy thereof has been submitted to an authorized insurance agent or broker, and that the
proof of insurance required therein will be submitted within thirty (30) days after notification of the
acceptance of the Contractor's bid.
The Contractor understands that the Contract will not be executed by the City until all proof of
insurance have been received and approved as to form by the City. Attorney.
The Contractor agrees that failure to submit the required proof of insurance within said thirty (30)
days shall constitute grounds at the City's discretion for awarding the Contract to the next lowest bidder and
for forfeiting the Contractor's bid bond.
Date: �2
Contractor
Name:
Signatui
Title:
C-to
D. CONTRACT
THIS CONTRACT FOR, Contract No. CS-0015, Vernon Avenue Storm Drain Trenchless
1 Manhole -To -Manhole Pipe Linings & Sectional Linings (Point Repairs) is made, entered into; and
executed in triplicate in the City of Vernon, California, as of the day of
2010.
BY AND BETWEEN
CITY OF VERNON, a municipal corporation
hereinafter referred to as "City"
SAK Con6+wch'pn of CA, I. P
referred to as "Contractor".
IN CONSIDERATION OF THE MUTUAL PROMISES, COVENANTS AND CONDITIONS
HEREIN SET FORTH, THE PARTIES DO HEREBY AGREE AS FOLLOWS:
Article 1. GENERAL
Section 1. Scope of Work
The Contractor will perform all the work described in the Contract Documents (the "Work") and
furnish all labor, equipment, tools, and materials necessary to complete the Work.
Section 2. Term of Contract
The term of this Contract shall be from the date this Contract is made and entered, as first written
above, and shall be completed upon final acceptance of the Work by the City and expiration of the guarantee
period as set forth in Section 43.
Section 3. Consideration
The City shall pay the Contractor for the performance of the Work hereunder in accordance with the
amounts set forth in the Bid Form Proposal completed by Contractor ("Bid Form Proposal").
Section 4. Payments
(a) Monthly Progress ss Payments
On or about the 25th day of each month, the Contractor shall submit to the City a monthly progress
payment request. The request shall contain an estimate of the amount and value of all the work performed by
the Contractor since the date of its last progress payment request. Upon receipt of the progress payment
request, the City's Representative shall review it as soon as practicable after receipt for the purpose of
determining that the request is a proper payment request. The City's Representative shall perform a quantity
validation prior to approving the monthly progress payment.
The City shall pay the Contractor the amount of the approved monthly progress payment, less 10%
retention. The monthly progress payment may also be reduced by the following: (1) amounts due to the City
for equipment, services or materials furnished by the City in connection with work done on the project; (2)
amounts of any claims or liens, and (3) amounts required to be deducted by Federal, State or local
governmental authorities. Payment shall be made within thirty (30) calendar days of City's approval of the
Contractor's monthly progress payment application.
If the City fails to make any progress payment within thirty (30) calendar days after receipt of an
undisputed and properly submitted progress payment request from Contractor, City shall pay interest to
- D-1 -
Contractor equivalent to the legal rate set forth in Code of Civil Procedure Section 685.010(a).
Any progress'payment request determined not to be a proper payment request suitable for payment
shall be returned to Contractor as soon as practicable, but not later than seven (7) days, after receipt. A
request returned pursuant to this section shall be accompanied by a document setting forth in writing the
reasons why the progress payment request is not proper.
The number of days available to the City to make a progress payment without incurring interest
pursuant to this section shall be reduced by the number of days by which the City exceeds the seven-day
return requirement set forth above.
No monthly payment shall be construed as acceptance of the Work, or any portion thereof, nor shall
such payment preclude the City from demanding and recovering from the Contractor such damages as may
be sustained by reason of the Contractor's failure to fully perform under the Contract.
(b) Final Progress ss Payment
Upon satisfactory completion of the Work described herein, the Contractor shall furnish the City
with a complete and final accounting of all labor, materials, and other costs incurred in the performance of
the Work. The Contractor shall be required to complete a close-out form certifying that the Work has been
completed and releasing the City from all further obligations and liabilities. The City shall pay the
Contractor according to the payment terms set forth in Section 4(a).
(c) Payment of the Retention
Payment of the retention shall be made thirty-five (35) calendar days after the recordation of a
Notice of Completion by the City or if a Notice of Completion is not recorded sixty-five (65) calendar days
after acceptance of the completed project. The acceptance will be made only by an action of the City
( Council of the City. Acceptance of payment of the retention by the Contractor shall constitute a waiver of all
claims against the City arising under this Contract.
Section 5. Contract Documents
(a) The Contract Documents shall govern the Work. The Contract Documents shall include the
following: (1) Notice Inviting Sealed Proposals (Bids); (2) Information for Bidders; (3) Bid Form Proposal;
(4) Contract; (5) Bid Bond, Performance Bond, Labor and Material Bond, Proof of Insurance, and Workers'
Compensation Certificate; (6) the City of Vernon Special Provisions and Federal Highway Administration
Requirements (collectively, "Special Provisions"); (7) detailed Plans and Specifications; (8) Standard
Specifications and Drawings; and (9) any addenda to Information for Bidders ("Addenda"). The Contract
Documents are intended to be complementary and cooperative.
Anything specified in the Specifications and not shown on the Plans, or shown on the Plans and not
specified in the Specifications, shall be as though shown on or specified in both.
(b) Precedence of Contract Documents
If there is a conflict between any of the Contract Documents, the document highest in precedence
shall control. The precedence shall be as follows:
1) Permits issued by jurisdictional regulatory agencies.
2) Change Orders and/or Supplemental Contracts; whichever occurs last.
3) The Contract.
4) Addenda.
5) Information for Bidders.
5) Bid Form Proposal.
6) Special Provisions.
- D-2 -
7) Detailed Plans and Specifications.
8) Standard Specifications and Drawings.
9) Bid Bond, Performance Bond, Labor and Material Bond, Proof of Insurance, and
Workers' Compensation Certificate.
Detailed drawings shall take precedence over general drawings.
Section 6. Compliance with Provisions of Law
The Contractor shall comply with all applicable provisions of law whether Federal, State, or local
relating to its performance under the Contract.
Section 7. Costs and Attorney's Fees
In the event a dispute, claim or litigation arises regarding this Contract, the prevailing party shall
beentitled to reimbursement for reasonable attorneys fees and actual costs, which may be set by arbitrators or
the court in the same action or in a separate action brought for that purpose, in addition to any other relief
which is obtained.
Section 8. Notices
Any notices, approvals, consents and other communications required or permitted hereunder shall be
given by personal delivery or by certified mail (return receipt requested), postage prepaid, and shall be
deemed received on (a) the day of delivery if delivered by hand during the receiving party's regular business
hours; or (b) the second business day following deposit in the United States mail as certified mail (return
receipt requested), postage prepaid, to the addresses set forth below:
To: Contractor
SACK Co nst ruc-ii c YN of CA, LP
l 0 3
N• Cool
Sp✓)
n6.s .
D' rnn
I I on
Mo
(o33 6 b -
To: City Clerk
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
Section 9. Conflict with Plans and Specifications
Any conflict between the Plans and Specifications and this Contract shall be brought to the attention
of the City's Representative for resolution.
Section 10. Assignment
The Contractor shall not assign the Contract in whole or in part or any rights, duties, or obligations
arising under the Contract. Any attempt by Contractor to so assign this Contract or any rights, duties, or
obligations arising hereunder shall be void and of no effect.
Section 11. Paragraph Headings
The paragraph headings herein are for the convenience of the parties and shall not affect the
interpretation of the Contract. .
- D-3 -
Section 12. Authority of the'City's Representative
The City's Representative shall be the City Administrator or his designee. The City;s Representative
shall decide all questions which may arise regarding the quality and/or acceptability of materials furnished,
the manner and/or acceptance of the Contractor's performance, the rate of progress, and the interpretation of
the Plans and Specifications.
Article 2. WAGES, HOURS and WORKING CONDITIONS
Section 13. General Prevailing Wages
The Contractor agrees that it, or any subcontractor working under it, will not pay less than the
prevailing rates of wages to all workers employed in the execution of this Contract. The Contractor will post
one copy of the established prevailing rates of wages at the job site. For each calendar day or portion
thereof, and for each workman paid less than the stipulated prevailing rates for such work or craft in which
the workman is employed or any work done hereunder by him, or by subcontractor under him, the Contractor
shall forfeit as a penalty to the City the sum of $25.00. The City shall take cognizance of all violations of
this section committed in the course of the execution of the Contract and shall report them to the Division of
Labor Standards Enforcement.
Section 14. Hours of Work
(a) The time of service of any worker employed on the Contract is limited to eight hours during
a calendar day and forty hours during a calendar week. If an employee works in excess of the foregoing
hours, the employee will be compensated at a rate of one and one-half times their basic rate of pay.
(b) The Contractor shall keep and make available until three (3) years after recordation of a
Notice of Completion by the City an accurate record showing the name of and actual hours worked each
calendar day and each calendar week by each worker employed by it on the work he
(c) The Contractor shall, as.a penalty, forfeit to the City $50.00 for each worker employed on
the work by the Contractor or by any subcontractor for each calendar day during which such worker is
required or permitted to work more than eight hours a calendar day or forty hours in one calendar week.
Section 15. Apprentices
The Contractor is responsible for complying with the provisions of Labor Code Section 1777.5
dealing with the employment of apprentices on the job site.
Section 16. Subcontractors
(a) The Contractor shall comply with the provisions of the "Subletting and Subcontracting Fair
Practices Act" contained in Public Contract Code Sections 4100, et sec..
(b) The Contractor shall submit to the City the following information:
(1) The name and location of the place of business of each subcontractor who will
perform work or labor or render services to the Contractor hereunder, or a subcontractor licensed by the State
of California, who, under subcontract to the Contractor, specially fabricates and installs a portion of the
Work or improvement according to detailed drawings contained in the Plans and Specifications, in an
amount in excess of one-half of one percent of the Contractor's total bid.
(2) The portion of the Work to be done by each subcontractor identified in Section
16(b)(1).
- D-4 -
(c) The Contractor shall list only one subcontractor for each portion of Work as defined by the
Contractor in its bid.
(d) The Contractor shall not use a subcontractor who is ineligible to perform work on a public
works project pursuant to Labor Code Section1777.1 or 1777.7.
Section 17. Discrimination
The Contractor shall not refuse to employ or promote any person, shall not discriminate against any
person with respect to compensation received or terms and conditions of employment, and shall not
discipline or discharge any person in its employment because of the person's race, religion, creed, color,
national origin, ancestry or sex. In addition, the Contractor shall not refuse to accept otherwise qualified
employees as indentured apprentices solely on the grounds of race, religion,, creed, color, national origin,
ancestry or sex.
Section 18. Safety
The Contractor and all subcontractors shall comply with the provisions of the Safety and Health
Regulations for Construction, promulgated by the U.S. Secretary of Labor under Section 107 of the "Contract
Work Hours and Safety Standards Act'-', as set forth in Title 29 of the Code of Federal Regulations, and by
the State of California, Division of Industrial Safety.
Section 19. Competence of Workers
All persons performing the Work shall have all necessary technical expertise, permits, professional
licenses, certificates, training, and other qualifications required by this Contract or other applicable laws.
Contractor shall provide City with said permits, licenses, and certificates at the request of City.
Article 3. INSURANCE, INDEMNIFICATION and BONDS
Section 20. Insurance
(a) The Contractor shall provide the City with proof of insurance naming the City, its
consultants and each of it selected officials, officers, agents, employees, and volunteers as additional -named
insureds on a policy or policies of insurance providing and maintaining the coverages set forth in the
Insurance Schedule contained herein. The Contractor shall at all times during the term of the Contract carry,.
maintain, and keep in full force and effect, the policy or policies of insurance set forth in the Insurance
Schedule, including all special endorsements listed on the Insurance Schedule. Said coverage is not required
for the active negligence of the City to the extent that indemnification for the City's active negligence would
be invalid under Civil Code Section 2782(b) of the. The proof of insurance shall also provide that said
policy or policies are not to be canceled or materially reduced without giving the City at least 30 days written
notice.
(b) The Contractor shall require each of its subconsultants or subcontractors to maintain
insurance coverage that meets all of the requirements of the Contract.
(c) The policy or policies required by this Contract shall be issued by an insurer. admitted in the
State of California and with a rating of at least a B+;VII in the latest edition of Best's Insurance Guide.
(d) The Contractor agrees that if it does not keep the aforesaid insurance in full force and effect,
the City may either immediately terminate the Contract or, if insurance is available at a reasonable cost, the.
City maytake out the necessary insurance and pay, at Contractor's expense, the premium thereon.
(e) The insurance provided by Contractor shall be primary to any coverage available to the City,
and any insurance or self-insurance maintained by the City or its elected officials, officers, agents, employees
or volunteers shall be in excess of Contractor's insurance and shall not contribute to it. The policies of
D-5 -
insurance required by the Contract shall include provisions for waiver of subrogation against the City.
(f) Any deductibles or self -insured retentions must be declared to and approved by the City. At
( the option of the City, Contractor shall either reduce or eliminate the deductibles or self -insured retentions
with respect to the City, or Contractor shall procure a bond guaranteeing payment of losses and expenses.
Section 21. Indemnification
(a) . To the fullest extent permitted by law, Contractor shall indemnify, protect, defend, and hold
Harmless the City, its consultants and each of its elected officials, officers, agents, employees, and volunteers,
from and against any and all claims, demands, losses, damages, liabilities, fines, charges, penalties, orders,
judgments, and all costs and expenses incurred in connection therewith, including reasonable attorneys' fees
And costs of defense arising, directly or indirectly, in whole or in part, out of the services performed under
this Contract, except to the extent arising from or caused by the sole active negligence or willful misconduct.
of the City, its elected officials, officers, agents, employees or volunteers.
(b) The provisions of this section shall not terminate or expire, shall be given the broadest
possible interpretation, and shall survive the expiration or earlier termination of this Contract.
(c) The obligations in this section are in addition to Contractor's duty to provide insurance and
shall not be limited by any limitation on the amount or type of insurance coverage carried by Contractor.
Section 22. Workers' Compensation
The Contractor shall secure payment of compensation to Contractor's employees pursuant to Labor
Code Section 3700, and shall obtain employers' liability insurance as set forth in the Insurance Schedule.
Prior to commencing work hereunder; the Contractor shall submit to the City the Workers' Compensation
Certificate. or an executed certificate of workers' compensation insurance as provided herein. Such insurance
shall include a waiver of subrogation endorsement naming the City, and its consultants, and each of its
elected officials, officers, agents, employees and volunteers.
Section 23. Labor and Material Bond
The Contractor shall execute and deliver to the City for its approval and acceptance a Labor and
Material Bond in an amount equal to the total amount payable under the terms of this Contract. Said bond
shall be payable by surety or sureties to the City in the event the Contractor fails to pay its subcontractors for
labor and material used in this project. Said bond shall be in substantially the same form as that attached
hereto. The surety will be one that the City finds acceptable.
Section 24. Performance Bond
The Contractor shall execute and deliver to the City for its approval and acceptance a Performance
Bond in an amount equal to the total amount payable under the terms of this Contract. Said bond shall be
payable by surety or sureties to the City in the event the Contractor fails to fully perform under this Contract.
Said bond shall be in substantially the same form as that attached hereto. The surety will be one that the
City finds acceptable.
Article 4. PERFORMANCE
Section 25. Time for Completion
The work shall be completed in the number of working days specified in the Bid Form Proposal.
=DW=
Section 26. Force Maieure
Neither Party shall be considered to be in default in any of its obligations under this Contract when a
failure of performance shall be due to an uncontrollable force. The term "uncontrollable force" shall mean
any cause beyond the control of the party affected,, including, but not restricted to, flood, earthquake, storm,
fire, lightening, epidemic, war, riot, civil disturbance or disobedience, sabotage, or embargoes of the United
States Government or any other government, which by exercise of due diligence such party could not
reasonably have been expected to avoid and by exercise of due diligence has been unable to overcome.
Either party rendered unable to fulfill any of its obligations under this Contract by reason of an uncontrollable
force, shall give. written notice within five (5) Business Days of such fact to the other party and shall exercise
due diligence to remove such inability with all reasonable dispatch.
Section 27. Utility Relocation
(a) The City will identify the main and/or trunk lines in the Plans and Specifications. The City
is responsible for the timely removal, relocation or protection of existing main and/or trunk line utility
facilities located on the construction site, unless such utilities facilities are identified by the City in the Plans
and Specifications. The City shall pay the costs of removing or relocating utility facilities not identified in
the Plans and Specifications with reasonable accuracy, repairing damage not due to the Contractor's failure
to exercise reasonable care, and equipment on the project necessarily idled during such work. The
Contractor shall not be assessed liquidated damages for delay in completion of the project, when such delay
is caused by the failure of the City or the utility owner to provide for the removal or relocation of such utility
facilities.
(b) Nothing herein shall be deemed to require the City to indicate the presence of existing
service laterals or appurtenances whenever the presence of such utilities on the construction site can be
inferred from the presence of other visible facilities, such as buildings or metering junction boxes on or
adjacent to the construction site.
(c) If the Contractor, while performing under the Contract, discovers utility facilities not .
identified by the City in the Plans or Specifications, the Contractor shall immediately notify the City's
Representative and the utility owner in writing.
.Section 28. Public Convenience
(a) The Contractor's operation shall not unnecessarily cause any public inconvenience. The
access rights of the public shall be considered at all times. Unless otherwise authorized, traffic shall be
permitted to pass through the Work or an approved detour shall be. provided. Safe, adequate, continuous and
unobstructed pedestrian and vehicular access shall be maintained to fire hydrants, water valves,
residences, commercial and industrial establishments, churches, schools, parking lots, service stations,
motels, .fire and police stations, and hospitals, unless other arrangements are made satisfactory to owners
thereof.
(b) Vehicular access to residential driveways shall be maintained to the property line except
when necessary construction precludes such access for reasonable periods of timer
(c) Grading operations, roadway excavation and embankment construction shall be conducted
by the Contractor in a manner that provides a reasonably satisfactory surface for traffic. When rough grading
is completed, the roadbed surface shall be brought to a smooth, even condition satisfactory for traffic.
(d) The Contractor shall comply with all applicable State, County and City requirements for the
closure of streets. The Contractor shall provide barriers, guards, lights, signs, temporary bridges, flagmen
and watchmen advising the public of detours and construction hazards. The Contractor shall also be
responsible for compliance with additional public safety requirements that may arise during construction.
The Contractor shall furnish and install and, upon completion of the Work, promptly remove all signs and
warning devices.
D-7 -
(e) At least 48 hours in advance of closing or partial closing or of reopening any street, alley, or
other public thoroughfare, the Contractor shall notify the police, fire., public transportation (MTA), traffic
and engineering departments of the City and any other jurisdictional agencies involved and shall comply with
their requirements.
Section 29. Excavations
(a) Excavation Safety
During the excavation of trenches five (5) feet or more in depth, the Contractor shall submit to the
City, for its approval, a detailed plan showing the design of shoring, bracing, sloping, and other provisions to
be made for worker protection from the hazard of caving ground. Said plan shall be at least as effective as
that required by the Construction Safety Orders of the California Division of Industrial Safety. If the
Contractor's plan varies from the shoring system standards established by said Safety Orders, the plan shall
be prepared by a registered civil or structural engineer.
(b) Closure
At the close of each working day, the Contractor shall cover completely all open excavations in the
public right-of-way with steel plates in accordance with normal practice in the industry and the rules,
regulations, laws and ordinances of the State of California, the County. of Los Angeles, and the City of
Vernon, and the Special Provisions -Temporary Cold Mix Asphalt Concrete.
Section 30. Extra Work
(a) The City may require changes in, additions to, or deductions from the Work to be performed
or to. the materials to be furnished hereunder. No extra work shall. be performed or change or addition made
without a written order from the City. The written order shall state that the extra work, change or. addition is
authorized by the City, identify the work that is to be done and method to be used to accomplish the work,
and set forth the basis upon which payment is to be made. Nothing yin this article shall excuse the Contractor
from proceeding with the prosecution of the Work so changed. The Contractor shall, when required by the
City, furnish an itemized breakdown of the quantities and prices used in computing the amount of any
change or addition that might be ordered. The adjustment, if any, in the amount to be paid to the Contractor
..by reason of any such change,. addition or deduction shall be determined by one of the following methods:
(1) A lump sum proposal from the Contractor.
(2) By applying the unit prices contained in the Bid Form Proposal or fixed by agreement
between the City and the Contractor.
(3) By proceeding with the Work and furnishing daily reports of extra work by the close of the
next working day. Failure to submit the daily report in a timely manner may waive the
Contractor's right to compensation for that day. An attempt shall be made to reconcile the
report daily, and it shall be signed by the City's Engineer or his designee. The daily report
shall itemize the costs for labor, materials, and equipment rental. Reportedlabor costs shall
include the names and classifications of the workers, the hours worked, and the rates of pay.
Reported equipment costs shall include the, type of equipment used, the identification
number, the hours of operation, and hourly rate. All records and reports shall be made
immediately available to the City's Representative.
(b) Markup
This section shall modify and replace "Section 3-3.2.3, Markup" of the Standard Specifications for
Public Works Construction (2009 Edition) referenced and incorporated herein by Section 47.
(1) Work by Contractor. The following percentages shall be added to the Contractor's costs and
- D-8 -
shall constitute the markup for all overhead and profits:
a) Labor 20%
. ......................
b) Materials ......................15%
c) Equipment Rental .....................15%
d) Other Items and Expenditures ............15%
To the sum of the costs and markups provided for in this subsection, 1 percent shall be added
as compensation for bonding.
(2) Work by Subcontractor. When all or any part of the extra work is performed by a
Subcontractor, the markup established in (1) shall be applied to the Subcontractor's actual
cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of
the extra work and a markup of 5 percent on work added in excess of $5,000 of the
subcontracted portion .of the extra work may be added by the Contractor.
Section 31. Clean Up
Upon completion of the Work, the Contractor shall remove all debris and surplus materials from the
work site.
Section 32. Materials
(a) New Materials and Equipment
Unless otherwise specified, shown, or permitted by the City all material and equipment incorporated
in the Work shall be new and of current manufacture. The City may request that the Contractor furnish
manufacturer's certificates indicating the quality of the material. No material shall be installed until
approved by the City's Representative.
(b) Inspection of Materials
All material furnished hereunder shall be subject to inspection and testing by the City's authorized
agents at the City's expense. In the event that such inspection and testing reveals material that does not
comply with the Contract Documents, the Contractor shall bear the cost of necessary corrective measures as
well as the cost of subsequent inspection and testing.
(c) Defective Equipment or Materials
The inspection under Section 31(b) shall not relieve the Contractor of any of its obligations under the
Contract. Even though equipment or material required to be provided has been inspected, accepted, and
included in a monthly progress payment request, the Contractor shall, at Contractor's expense, replace or
repair any such equipment or material found to be defective or otherwise non -compliant with the Contract
Documents up through the guarantee period in Section 43.
(d) Storage of Materials
All material for use in the Work shall be stored by the Contractor in such a manner as to prevent
damage from exposure to the elements, from admixture of foreign materials or from any other cause. The
Contractor shall be solely responsible for damage or loss of materials caused by exposure, weather or other
causes.
Section 33. Permits and Licenses
(a) The Contractor shall apply for and procure all certificates, permits and licenses required by
federal, state, or local law, rule or regulation necessary for the work except:
- D-9 -
Encroachment Permits from City of Vernon.
(b) The Contractor shall provide all notices necessary and incidental to the lawful prosecution of
the work and shall comply with the terms and conditions of all certificates, permits and licenses.
(c) The Contractor shall pay all charges and fees in connection with all certificates, permits and
licenses except those required by the following:
Encroachment Permits from City of Vernon.
Section 34. Land and Rights of Way
(a) The Cityshall provide, or arrange for the provision of, the land and rights of way upon
which the Work is to be constructed.
(b) The Contractor. shall procure any additional rights of way desired by the Contractor to
facilitate construction of the Work. The Contractor shall enter into written agreements with property owners
for such purposes and shall provide the City with copies of such agreements.
(c) Except as provided in Section 27, when the work described in the Contract Documents is to
be performed in the vicinity of existing improvements, said improvements shall not be disturbed or damaged.
However, the Contractor may remove or relocate improvements in the land and rights of way provided by the .
City pursuant to Section 34(a).
Section 35. Plans and Drawings
(a) The approved plans may be supplemented by working drawings as are necessary to monitor
the Work. All drawings shall be consistent with the Contract Documents. All such drawings delivered to the
Contractor shall be deemed written instructions to the Contractor.
(b) The City will. furnish the Contractor with copies of all drawings and specifications
reasonably necessary for the execution of the work, at no charge. The Contractor shall keep one set of
drawings and specifications in good order at the job site and make them available to the City's
Representative and to the Contractor's representatives.
(c) The drawings and/or plans will show conditions as the City believes them. to exist; but it is
not intended or to be inferred that the conditions as shown thereon constitute a representation -by the City that
such conditions are existent. The City shall not be liable for any loss sustained by the Contractor as a result
of any variance of the conditions as shown on the drawings and/or plans and the actual conditions revealed
during the progress of the Work, or otherwise.
Section 36. Shop Drawings Submitted by the Contractor
(a) No portion of the Work requiring a shop drawing submittal shall be commenced until the
submittal has been reviewed by the City and returned to the Contractor with a notation that the City has
completed its review of the shop drawing. Shop drawings are drawings, diagrams, illustrations, schedules,
performance charts, brochures and other data which are prepared by the Contractor or any subcontractor,
manufacturer, supplier or distributor, and which illustrate some portion of the material or Work.
(b) The Contractor shall review, approve, and submit for review by the City's Representative
shop drawings for material and equipment to be incorporated into the Work. Four (4) copies of shop
drawings shall be submitted to the City with a letter of transmittal listing the submitted. Drawings shall
show the name of the project, the name of the Contractor, and the names of suppliers, manufacturers, and
- D-10 -
subcontractors, if any. Shop drawings shall be submitted with promptness and in orderly sequence so as to
cause no delay in progress of the Work.
j (c) Shop drawings shall be complete. If the shop drawings show any deviation from the
requirements of the Plans and Specifications because of standard shop practices or other reasons, the
deviations and the reasons therefore shall be set forth in the letter of transmittal.
(d) By approving and submitting shop drawings, the Contractor represents that material,
equipment and other work shown thereon conforms to the plans and specifications except for. any deviation
identified in the letter of transmittal.
(e) Within ten (10) calendar days after receipt of the shop drawings, the City will return two
prints of the drawings to the Contractor along with its comments. The Contractor shall resubmit corrected
drawings, if the City has so requested. Resubmitted shop drawings shall be processed in the same manner as
the original submittals. The Contractor's letter of transmittal accompanying its resubmitted shop drawings
shall highlight the revisions requested by the City.
(f) The City's Representative will review the shop drawings only for general conformance with
the design concept of the project and general compliance with the Plans and Specifications. The City's
review of the shop drawings shall not be construed as relieving the Contractor of its responsibilities under the
Contract, including but not limited to: (1) providing material and equipment; (2) ensuring the proper fitting
and construction of the pipeline; (3) submitting accurate and complete shop drawings; (4) selecting proper
fabrication processes and techniques; and (5) performing the Work in a safe manner.
Section 37. Supervision by the Contractor
The Contractor shall have a designated representative or alternative representative present at the
worksite whenever work is in. progress. The Contractor's designated representative or alternate
representative shall have authority to act for the Contractor. Before starting the Work, the Contractor shall
inform the City, in writing, of the name of its designated representative. An alternate representative may also
be designated. Any communication between the City and the Contractor's representative shall be deemed as
a communication to the Contractor. If the Contractor fails to have a designated representative present at the
worksite, the City's Representative may give necessary direction or instruction to the superintendent or
foreman having charge of the specific work to which the direction or instruction applies. The superintendent
or foreman shall comply with the direction or instruction promptly and shall relay the City's communication
to the Contractor or its designated representative.
Section A Inspection of Work
(a) The City shall have access to the worksite at all times to review and/or inspect the progress
of the Work, the workmanship and the material being used.
(b) Whenever the Contractor changes its hours of operation, notice shall be approved by the
City's Representative one week prior to institution of the change. Any work done in the absence of the City's
Representative may be subject to rejection, at the City's discretion.
(c) All excavations that are to be backfilled shall be inspected and approved by the City's
Representative prior to backfilling. The Contractor shall give the City's Representative advanced notice of
the backfilling.
(d) Inspection of the Work by the City's Representative shall not relieve the Contractor of the
obligation to fulfill the Contract. Defective work shall be corrected, notwithstanding the fact that the City's
Representative may have previously accepted the defective work.
- D-11 -
Section 39. Correction of Defective and/or Unauthorized Work
(a) All work that has been rejected shall be corrected, or removed and replaced by the
Contractor, at the City's direction. Any remedial work will be done in a manner acceptable to the City. The
Contractor shall pay the remediation and/or removal and replacement costs. The Contractor must obtain
written authorization from the City to perform extra or unauthorized work prior to undertaking such work.
The Contractor will not be compensated for any unauthorized work. In addition, the City may order the
Contractor to remove, at the Contractor's expense, any extra or unauthorized work.
(b) The Contractor must comply promptly with any order made by the City under the provisions
of this article. If the Contractor fails to comply with the City's orders, the City may in its discretion cause
defective work to be corrected by its own forces or by another contractor. The amount that the .City paid to
correct the defective work will be deducted from any monies due or to become due to the Contractor.
Section 40. Errors or Discrepancies Noted by the. Contractor
(a) If the Contractor, either before commencing the Work or in the course of performing the
Work, finds any discrepancy between the Contract Documents, especially the Plans, Specifications,
drawings, and boring logs, or between any of them and .the physical conditions at the worksite, or finds any
error or omission in any of the Plans, Specifications, drawings, boring logs, or in any survey, the. Contractor
shall promptly notify the City in writing of such discrepancy, error, or omission. If the Contractor observes
that any Plans, Specifications, or drawings are at variance with any applicable law, ordinance, regulation,
order or decree, Contractor shall promptly notify the :City in writing of such deviation or conflict.
(b) The City, upon receipt of such notice, shall promptly investigate the circumstances and give
appropriate instruction to the Contractor consistent with Section 30. Until such instruction is given by the
City Engineer, any work done by the Contractor, either directly or indirectly after its discovery of such error,
discrepancy, omission, deviation or conflict, will be at the. Contractor's own risk. The Contractor shall bear
all costs arising from any work that incorporates such error, discrepancy, omission, deviation or conflict.
Section 41. Equipment
The Contractor shall furnish equipment and facilities to perform the work to the industry standard in
accordance with the Plans and Specifications. Such equipment and facilities must be in a good state of
repair, be maintained in such state during the progress of the Work, and shall meet all requirements of
applicable ordinances and laws. No worn or obsolete equipment shall be used, and in no case shall.the
manufacturer's rating of capacity for any equipment be exceeded.
Article 5. MISCELLANEOUS
Section 42. Damages for Delay
(a) The Contractor acknowledges the City's desire that the Work be completed on or before the
dates specified in the Bid Form Proposal. The Contractor also acknowledges that if its work is not completed
on or before said dates, the City will incur substantial damages that cannot be ascertained at this time.
Accordingly, the Contractor shall pay to the City any and all damages caused by the Contractor's delay in
completing the Work under the Contract.
(b) If the Work is not completed in accordance with the foregoing, it is mutually agreed that the
City will suffer damage, that it will be impractical and unfeasible to determine the amount of actual damage.
Therefore, the Contractor will pay the City, as fixed and liquidated damages and not as a penalty, the sum of
$1,500.00, for each and every calendar day of delay, and that the Contractor and its Surety will be liable for
the amount thereof. The Contractor, however, will not be charged liquidated damages because of any delays
in the completion of the work due to Force Majeure or acts of the City, acts of another Contractor in the
performance of a Contract with the City, and without the fault or negligence of the Contractor.
D-12 -
(c) The Contractor shall within ten (10) days from the beginning of any such delay (unless the
City grants a further period of time prior to the date of final settlement of the Contract) notify the City in
writing of the cause of delay. Upon notification of a delay, the City shall ascertain the facts and extent of the
delay and extend the time for completing the work if in its sole and absolute discretion its findings justify
such an extension. The City's findings shall be final and conclusive on the parties hereto.
(d) The City shall have the right to extend the.time for completion if it determines such
extension to be in the City's best interest. If the City extends the time limit for completing the work by way
of a change order at the request of the Contractor, and for other than Force Majeure, it is understood and
agreed that such time extension will increase the City's expenses. These expenses include, but are not
limited to, the costs associated with engineering, inspection, supervision, incidental and overhead expenses
that are directly chargeable to the Contract and that accrue during the period of extension. Therefore, the
Contractor acknowledges that the City shall be reimbursed for its expenses before the final payment of the
ten percent (10%) retention is made.
Section 43. Guarantee
The Contractor guarantees the Work against defective workmanship, and the. materials furnished, for
a period of one year from the date the City accepts the work in accordance with Section 4(c). The Contractor
shall repair and replace any and all such defective work, together with any other work which may be
displaced in so doing, at no cost to the City. The Contractor. is not responsible for the.repair or replacement
of material damaged through ordinary wear and tear, usual abuse, or neglect. The City may proceed to repair
or replace defective work and/or material. if the Contractor fails to do so within a week after Contractor's
receipt of written notice from the City. The Contractor agrees to pay the costs and charges the City incurs in
repairing and replacing defective work and/or materials upon demand.
Section 44. Risk of Loss Prior to Final Acceptance
Except as set forth hereinabove relating to Force Majeure, all risk of loss resulting from total or
partial destruction of the Work, or any part thereof, or any damage thereto, prior to final acceptance of the
work by City, shall be borne by the Contractor regardless of the cause. The Contractor, at. its sole cost, shall
repair or replace such damaged or destroyed work to its prior undamaged condition before being entitled to
additional progress payments, the final progress payment or payment of the retention. Such total or partial
destruction or damage shall not excuse the Contractor from completion of the Work.in accordance with the
provisions of this Contract.
Section 45. Termination
(a) Termination (Contractor's Default)
(1) The Contractor will be in default if it does any of the following: (a) declares bankruptcy,
becomes insolvent, or assigns its assets for the benefit of its creditors; (b) disregards or violates a material
provision of the Contract or the City's instructions; (c) fails to prosecute the Work according to the approved
construction schedule; (d) fails to provide a qualified superintendent, representative, competent workers, or
subcontractors; and/or (e) fails to provide materials or equipment that meets the requirements of the Plans,
Specifications, and drawings. The City shall notify the Contractor in writing of such default. Upon receipt
of written notice of default, the Contractor shall, at Contractor's expense, preserve at the project site, all
construction materials and equipment, and shall undertake immediate steps to remedy such default.
(2) Upon the occurrence of any of the events stated in Section 45(a)(1), the City may, at its
option, terminate the right to proceed with the Work to which default has occurred or terminate the Contract
if the Contractor fails to cure such default within ten (10) calendar days after receipt of written notice of
default. A written notice of termination shall be provided to the Contractor, but not to the Contractor's
sureties. Upon receipt of such written notice, the Contractor shall at its expense and for the work affected by
any such termination:
D-13 -
(i) assist the City in making an inventory of all material and equipment located at the site,
enroute to the site, in storage or manufacture away from the site, and/or on order from
suppliers;
assign subcontracts, material and equipment supplier contracts, and equipment rental
agreements to the City, as designated by the City; and
remove from the site all construction material and equipment listed in said inventory
other than the material and equipment which are to be used by the City in completing the
Contract.
(3) The City shall have the right to complete the Work to which the termination applies. The
Contractor agrees that the City shall have the right, for such purpose and for as long as necessary, to
designate in writing, take possession of and use any or all of the material, plant, tools, equipment, supplies
and property furnished by the Contractor.
(4) The cost of completing such work, together with reasonable costs for administering any
contract for completion, will be charged to the Contractor. The City will deduct these costs from the sum
due or the sum that may become due to the Contractor. If these costs exceed the sum which would have been
payable under the Contract, then the Contractor and/or its sureties shall be liable for and, upon written notice
from the City, shall promptly pay the excess amount to the City. The City shall not be required to retain the
bidder with the lowest estimate for completion of the work. The City may make any expenditures that, in its
sole judgment, best accomplish the completion of the project.
If such costs are less than the balance that would have been due, the Contractor shall have no claim
to the difference. The City may, however, decide to reimburse the Contractor or the Contractor's sureties for
costs incurred for materials, tools, equipment, property, and labor which were usedin performing the Work
and of which the City shall have received the benefit. In computing the costs, as it relates to equipment
owned by the Contractor, the salvage value at completion of the Work shall be deducted from the depreciated
value at the time the Contract was terminated.
(b) Optional Termination of Contract by City
(Contractor Not at Fault)
City may terminate the Contract upon ten (10) .days written notice to the Contractor, if it is found that
reasons beyond: the control of either the City or the Contractor make it impossible or against the City's
interests to complete the Work. In such a case, the Contractor shall have no claims against the City except
for (1) the cost of the work performed up to the date the Contract is terminated, and (2) for the cost of
materials and equipment at the site, in transit, or on definite commitment, as of the date the Contract is
terminated, provided that such materials and equipment would be needed in the Work and meet the
requirements of the specifications.
The cost of the work performed and the cost of materials and equipment, as mentioned above, shall
be determined by the City in accordance with the procedure prescribed for making of a final progress
payment as described in Section 3.
Section 46. Records, Inspection, and Audit
During the course of the Work performed under this Contract, Contractor and any of its
subcontractors shall maintain and retain, not less than three (3) years after the term of the Contract expires,
complete and accurate records of the Contractor's costs which are chargeable to the City under this Contract.
City or its designated, authorized representatives shall have the right during this three (3) year period, upon
written reasonable notice, to inspect and audit those records. Such records to be maintained and retained.by
Contractor shall include: (a) payroll record accounting for the total time distribution of the Contractor's
employees working full or part time on the Work (to permit tracing to payroll payments in cash); (b) invoices
for purchases, receiving and issuing documents, and all the other unit -inventory records for the Contractor's
D-14 -
stores, stock or capital items; (c) paid invoices and canceled checks for material purchased and for the
subcontractor's and other third parties' charges; and (d) any other documentation the City deems necessary to
support costs and charges under this Contract.
Section 47. Standard Specifications
The "Standard Specifications for Public Works Construction", 2009 Edition, published by Building
News, Inc. is hereby incorporated by this reference and made a part hereof as though fully set forth at length.
In the event, however, that said Standard Specifications are inconsistent with the terms of this Contract and
the Special Provisions, then this Contract and the Special Provisions shall be deemed controlling.
Section 48. Independent Contractor,
The Contractor is and shall at all times remain, as to the City, a wholly independent Contractor.
neither the City nor any of its elected officials, officers, employees, agents or volunteers shall have control
over the conduct of Contractor or any of Contractor's agents or employees, except as herein set forth.
Contractor shall not, at any time, or in any manner,_ represent that it or any of its agents or employees are in
any manner agents or employees of the City.
Section 49. Waiver
The waiver by either party of a breach or default by the other party shall not be deemed a waiver of
any different or later breach whether of the same or other covenant or condition; nor shall any delay or
omission by either party to exercise any right it. may have under this Contract operate as a waiver of any
breach or default of such a right. The failure of either party to this Contract to exercise any of its rights under
this Contract does not constitute a breach of it and shall not be deemed to be a waiver of such rights or a
waiver of any subsequent breach. No waiver, benefit, privilege, or service voluntarily given or performed by
a party shall give the other party any contractual rights by custom, estoppel, or otherwise.
Section 50. Governing Law
The rights, obligations, duties and liabilities of the parties to this Contract and the interpretation of
this Contract shall be governed by the domestic law of the State of California, without regard to its laws
regarding choice of applicable law. Any litigation concerning this Contract shall take. place in the superior
court with geographic jurisdiction over the City of Vernon.
Section 51. City Not Obligated to Third Parties
The City shall not be obligated or liable under this Contract to any party other than Contractor. The
City shall timely notify Contractor of the receipt of any third -party claim relating to this Contract. The City
shall be entitled to recover its reasonable costs incurred in providing the notification required by this section.
Section 52. Dispute Resolution
(a) All disputes arising out of or related to this Contract, either party's conduct in connection
with this Contract, and the relationship and rights of the parties in connection with this Contract, whether
characterized as a breach of contract, tort, .or otherwise, shall be determined by binding arbitration in
accordance with the terms of this section. The submittal of matters to arbitration in accordance with the
terms of this section is the sole and exclusive method, means, and procedure to resolve any and all claims,
disputes or disagreements arising under this Contract, except for claims by either party which seek injunctive
relief, which claims shall be shall be resolved by suit filed in the Superior Court of the County of Los
Angeles, California, the decision of which court shall be subject to appeal pursuant to applicable law. The
parties hereby irrevocably waive any and all rights to the contrary and shall at all times conduct themselves
in accordance with the terms of this Section, relying on arbitration as the sole means of resolution of
disputes.
- D-15 -
(b) Arbitration of all matters required to be arbitrated hereunder shall take place before a panel
of three (3) retired judges of the Superior Court of the State of California (the "Arbitrators") under the
_ auspices of the Judicial Arbitration & Mediation Services ("JAMS"). Such arbitration shall be initiated by
the parties, or either of them, within ten (10) calendar days after either party sends notice of a demand to
arbitrate ("Arbitration Notice") to the other party and to JAMS. The Arbitration Notice shall contain a
description of the subject matter of the arbitration, the dispute with respect thereto, the amount involved, if
any, and the remedy or determination sought. Each party shall select a retired judge from the JAMS panel,
and the two. selected judges shall mutually agree on the third retired judge from the JAMS panel. If one of
the parties does not select a retired judge from the JAMS panel within fourteen (14) calendar days after
receipt of the Arbitration Notice, JAMS will select the second judge, and the judge selected by JAMS and the
judge selected by the other party will select the third judge for the panel. The third judge shall be selected
within ten (10) calendar days following the selection of the first two judges. The three judges will together
serve as the Arbitrators. The arbitration shall be conducted in Los Angeles, California. Any party may be
represented by counsel and/or other authorized representatives. Except as specifically provided in this
Section 30, the arbitration shall be conducted in accordance with JAMS Engineering and Construction
Arbitration Rules and Procedures.
(c) In rendering decision(s), the Arbitrators shall determine the rights and obligations of the
parties according to the substantive and procedural laws of the State of California and the terms of this
Contract. The Arbitrators' decision shallbe based on the evidence introduced.atthe hearing and
accompanied by a written statement of decision as to each of the principal controverted issues. The
agreement of two (2) of the three (3).Arbitrators as to the resolution of the dispute shall be a conclusive
resolution. The Arbitrators shall deliver the written decision to the parties within thirty.(30) calendar days
following the date of the hearing. The decision shall be conclusive and binding, and it may thereafter be
confirmed.as a judgment by the Superior Court of the State of California; subject only to challenge on the
grounds set forth in Code of Civil Procedure Section 1286.2.
(d) The validity and enforceability of the Arbitrators' decision shall be determined exclusively
by the California courts.
Section 53. Assignment of Unfair Business Practices
The Contractor and its subcontractors offer and agree to assign to the City all rights, title, and interest
in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the
Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and
Professions Code), arising from the purchases of goods, services, or materials pursuant to this Contract or
subcontracts. This assignment shall be made and become effective at the time the City tenders final payment
to the Contractor, without further acknowledgment by the parties.
Section 54. Entire Agreement
This Contract represents the entire integrated agreement between the City and Contractor, and
supersedes all prior negotiations, representations or agreements, either written or oral. This Contract may be
amended only by a written instrument signed by both the City and Contractor.
Section 55. Headings and Captions
The headings and captions used in this Contract are for convenience only and shall in no way define,
limit, or describe the scope or intent of this Contract or any part of it.
Section 56. Authority to Execute this Contract
The person or persons executing this Contract on behalf of Contractor warrants and represents that
he or she has the authority to execute this Contract on behalf of Contractor and has the authority to bind
Contractor to the performance of its obligations hereunder.
- D-16 -
Section 57. Severability
- Invalidation of any provision contained herein or the application thereof to any person or entity by
judgment or court order shall in no way affect any of the other covenants, conditions, restrictions, or
provisions hereof, or the application thereof to any other person or entity, and the same shall remain in full
force and effect.
Section 58. Counterpart and Duplicate Originals
This Contract may be executed in counterpart originals, duplicate originals, or both, each of which is
deemed to be an original for all purposes.
Section 59. Survival of Terms
All of the terms and conditions of this Contract related to payment, indemnification, dispute
resolution and waiver shall survive termination of this Contract..
s
— D-17 —
IN WITNESS WHEREOF the parties hereto have executed this Contractor caused it to be executed
as of the day, month and year first above written.
AT'.
to
in
CITY OF VERNON
By
Hilario Gonzales, Ma or
A Q `i () PCYP M-
Yamaguchi ,/ Ir�,�erim amity Attorney
�/ CONTRACTOR
sun.d_wL
it* ft
Zcu. bY...C4. who pwsm* eppeaw
�n»endxww,w mt Name A ,� p1^ f
1W nu curvaee sKpreaed
r
-77
a> Signature
4psljet,:(
ZTitle
Thomas Bred'N
Notary Public Notary Seal
L.Troy
te of Missouri County of Warren
Commission Expires 12/11/2011 Name
Commission # 07410273
Signature
Title
NOTE: The complete and proper legal name of the Contractor shall be set forth above. If the Contractor is a
corporation, two signatures are required, as follows: (1) the chairman of the board, the president, or any vice-
president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any
assistant treasurer. If the bidder is a limited liability company, signatures are required of two members or
managers unless otherwise provided in the company's articles of organization. If the bidder is a partnership,
signatures are required of the partner or partners authorized to sign contracts on behalf of the partnership.
- D-18 -
E. BOND FORMS AND INSURANCE REQUIREMENTS
Contractor shall provide the City with a Workers' Compensation Certificate in a form substantially
similar to that shown herein. Both the Performance Bond and the Labor and Material Bond shall be provided
on the forms enclosed herewith. A Sample Letter of Credit is also enclosed as a guide for a bidder's security.
Insurance coverage shall be provided in the types and amounts shown on the Insurance Schedule. A
copy of the policy or a notarized letter from the insurance underwriter or carrier verifying the coverage must
be provided to the City in order to demonstrate proof of insurance.
- E-1 -
WORKERS' COMPENSATION CERTIFICATE
The undersigned acknowledges that Section 3700 of the California Labor Code requires every
employer to be insured against liability for worker's compensation or to undertake self-insurance in
accordance with the provisions of that Labor Code. The undersigned agrees to comply with such provisions
before commencing the performance of this Contract.
CONTRACTOR
Name
Signatui
Title .
Name
Signature
Title
NOTE: The complete and proper legal name of the Contractor shall be set forth above. If the Contractor is 'a
corporation, two signatures are required, as follows: (1) the chairman of the board,.the president, or any vice-
president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any
assistant treasurer. If the Contractor is a limited liability company, signatures are required of two members
or managers unless otherwise provided in the company's articles of organization. If the Contractor is a
partnership, signatures are required of the partner or partners authorized to sign contracts on behalf of the
partnership.
Workers' Compensation Certificate - I
- E-2 -
BOND NO. 12S401124
PREMIUM AMOUNT $1,586.00
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That
WHEREAS, the City Council of the City of Vernon, a municipal corporation, by action on the
day of 2010, has awarded to SAK CONSTRUCTION OF CA, LP
hereinafter designated as the "Principal", Contract No. CS-0015 for Vernon Avenue Storm Draiu
Trenchless Manhole -To -Manhole Pipe Linings & Sectional Linings (Point Repairs) in Los Angeles
County, California; and
WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the
faithful performance of said Contract;
SAFECO INSURANCE COMPANY OF AMERICA
NOW, THEREFORE, we, the Principal and as Surety, are held firmly bound unto the
CITY OF VBRNON hereinafter called the "Obligee," in the penal sum of ONE HUNDRED TEN THOUSAND TWO HUNDRED
NINETY AND 301100 DOLLARS ($ 110,290,30 ) lawful money of the United States of America, for
the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators
and successors, jointly and severally and firmly by these presents,
TIM CONDITION OF THIS OBLIGATION IS SUCH that if the abovebounden Principal, his heirs,
executors, administrators, successors or assigns shall in all things stand to and abide by, and well and truly
keep and perform the covenants, conditions, and agreements in said Contract, and any alteration thereof
made as therein provided, on his part to be kept and performed at the time and in the mammr therein
specified, and in all respects according to their true intent and meaning, and shall indemnify and save
harmless the Obligee, its officers and agents, as therein stipulated, this obligation shall become null and void;
otherwise it shall be and remain in full force and virtue. And the said Surety, for value received, hereby
stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract, or
to the work to be performed thereunder, or the specifications accompanying the same, shall in any way affect
its obligation on this bond, and it does thereby waive notice of any such change, extension of time, alteration
or addition to the terms of the Contract, or to the work or to the specifications, and said Surety agrees that in
case suit is brought on this bond, Surety will'pay City's reasonable attorney's fees to be fixed by the court.
Performance Bond - l
- E-3 -
IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for
all purposes be deemed an original hereof, have been duly executed by the Principal and Surety above
named, on the 11TH day of JANUARY 2011.
SAK CONSTRUCTION OF CA, LP
103 NORTH COOL SPRINGS ROAD, O'FALLON, MO 63366
Name _ _ ,
(Attach Acknowledgment) By
SAFECO INSURANCE COMPANY OAMERICA
ATTN: SURETY LAIMS DEPARTM T
1001 4TH AVEN i , STE. 1700, SEA LE, WA 98154
Name
(Surety
By
Lz-
SUSAN LUPSKI, ATTORNEY -IN -FACT
(Attorney -in -fact) .
APPROVED AS TO FORM:
Willard Yamagu Interim City Attorney
Performance Bond - 2
- E-4 -
ACKNOWLEDGEMENT FOR CONTRACTOR
ACKNOWLEDGEMENT FOR CONTRACTOR, IF LIMITED PARTNERSHIP
STATE OF MISSOURI }
COUNTY OF ST. CHARLES }
ON THE 13th DAY OF January 2011 , BEFORE ME
PERSONALLY APPEARED Boyd Hirtz TO ME KNOWN AND KNOWN TO ME
TO BE THE Vice President OF SAK Construction of CA LP,
A LIMITED LIABILITY COMPANY, DESCRIBED IN AND WHO EXECUTED THE
FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT (S)HE
EXECUTED THE FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT
(S)HE EXECUTED THE SAME AS AND FOR THE ACT AND DEED OF SAID LIMITED
LIABILITY COMPANY.
Notary Public
Troy Thomas Bradshaw
Notary Public Notary Seal
State of Missouri County of Warren
My Commission Expires 12/11/2011
Commission # 07410273
ACKNOWLEDGMENT OF SURETY COMPANY
STATE OF ......... Naw.Y.ork.) ss
COUNTY OF ...Nassau,,,,,,.
On this... January 11, 2011 before me personally came.. Susan Lupski
........
.....
to me know, who, being by me duly sworn, did depose and say; that he/she resides in
Nassau Cpunty . , , State of........ New York � that he/she is the Attorney -In -Fact of the
Safeco Insurance Company of America , ...the corporation described in which
.. .: .............
executed the above instrument; that he/she knows the seal of said corporation; that the
seal affixed to said instrument is such corporate seal; that is was so affixed by order of
the Board of Directors of said corporation; and that he/she signed his/her name thereto by
like order; and the affiant did further depose and say that the Superintendent of Insurance
of the State of New York, has, pursuant to Section 1111 of the Insurance Law of the State
of New York, issued to.... Safeco Insurance ...
Company of America .... ,,,,(Surety) his/her
...................................
certificate of qualification evidencing the qualification of said Company and its
sufficiency under any law of the State of New York as surety and guarantor, and the
propriety of accepting and approving it as such; and that such certificate has not been
revoked.
GRACE ACKERSON
Notary No IOIAC6111590w York
Qualified in Nassau County
Commission Expires June 14, 2012
NY acknowledgment
• Auru,Y56narr IrceNO;lr7(>1QulII,e SalecoIniurvuoCnmpunyo(hjn'
__.._..._. ._. ------'• _.___.___.___._...,.....--ASSETS
i NOMrnrted I
HenaCvlCW Aster I WIAftUed
Assets (Cr�s,,•2} 1 Assets
I acr d (Schecru,e D) _
2 Shxlcs (Saredula D); 2arn,283,831 2.9t82l5,'4}I 2,3v7 t5's,747
21 Prelervdsioricv
22 CU11114mstodcs .. ... ,
j 53,OJr.382 `'i3,A?S,EfR a4,fi28,lgtg
d Makk'go M,'ns rv, re�4 ewLL^ ?. ��e l3 •. .. . �??.871 axi. .. 12ik31,;2 187.403,551
3.1 IN liens
32 DG'uu tha•, Iirl Fdre .. 4y?z.k�,3 5232,S113
4 RMeAalo( ,IeA); '
4.1 Pny,eries reaped by IN MpanY (IM S , . 0 envumbrancp) .
42 P;Cper'des held (or Be aod(n.";on d inccnv (less 5 0 enaw+l>raxGi
4.3 Png gibes hed lot Sale )
peiwmkrontesj
5 Ca;h (S 123, i3 9°7 Schodu!a E • Parl i , Caa� - .. .. . .
Sthedub E • Pkl 2), aid shoti•Ierm invc=,,menls {$ i �9,355,18"0. S-.hCdd!a DA) r„�g (� .
G, CrnBagl�anc(vdudng& Ot�tYNamnar5 1g' 32B 2G7,x375a
7. Crhertl,rale�os5eis(8diodd,eaA) .... }
8. flcoa,v>utesfurszsu,ri8ea .. ,. T9,521, 5 ..,1,C3r{,005 ,?A,Sj6,E15 ,•34,5Q3,�
9 n+�grs9a'le+ueanvtorinveslodas§r.�s......
,U 6ubV-*. cash and fayU l Rml5 L,nes I to , ' .
,1, nEaplants le5ss ( `� re Imp
, . 0 d,ar5eo d 8 (kr 7il{e:M'U, aontpj .
12 ,nresimenlInWmeducanda rated ....
13. Prceliulns 582175�3 88$ZI,93Q 34;0�7f389
ectd wtisidelatioes: .. .... ... .. .
13.1 UncdlegedpteMMS VW ag"W bakrV,, In,he mfn cif cdlnd rn
13z D5 mm Pre,&-. alter,t;' ba1a,40 and hsit„AnCnls twlkbd hu(darrtfed' � � 501. ° ISr506 a1,?2!;3 5 780,278/{!5
akina(Yetdue(kldudingg(i0.781,421)eanledbuiunbFloi.pmmirms) 42YaS,75p S(
13,3 Aa,rrad rblro premiums
i4. Rareurance: .... , .. .. .. , .... ....a,az(,!ga ......?�,� .....?.�,1!9 ... • nQ•�
14.1 Airxwnl9 teccveraMe tram re nswers ....81,. 23p
i'42 Funds held bYe,'depha8ai vidr teAistl(ed r�rl,liar,l¢s. ..... . ... . ....... ... , . ... , . ¢!,169,230 .... ?(i9,,22.1,7Atl
14,3 Otl,er wr+tt(s Ca{Yahle underYainn,Imnce conlr�ys ...... , MAR
irL AmogntS nee VAM rely ft 10 Dri"Ured Pi"
45,1 own, fetCt aftcl nincomil at,eWVeYalfleandtn .. ......, .. .
IV Net Ws poW W 4SSe1 fdr s! diairxii . ..... (2,32,� ,G82 ' — " . ,!e 94 §88
17, ouaranlyfuadvid 1,$9�. ..,.j1�?goo .. ..oisse,��a
eC(vali,e or m do pt h .......... 1 i ,
i8. E!?ttrcb,c data Woo¢sskty equpnxx t sad 5tihu,re {� U14.� ... $,4029
1s. F(vndureand c�tip(hidi4ln h�aBil.w�redatv�lyas ....... ............i! . ?k yf
.20 Netadk`h11AaSsatauhd„ahalGtadUAtCfcrel@nealtHnretdtes v 169KIM
.' . ,784
21. Recehratlles8eyrlpg,ahl,subsrtadesAndA(Cdiaies . i ..
22 Neai@i casts . , . , , •,1aSS•h;, (1� ........ �•?� ,6S1,S G � G,d55.332 «rd oBl�r �no(m!s tFxeivab(e
23 A(�regaleµr'J�is for adxx Ihan Invexied taahp , • • ................... .. .
24 iotaissmts ,udhg$sp apyAxWhU, �d .....' 21,iB1 B?54 64 2910313 2, 257a
area Aa+ovdtsaid 1 �
PAA(cdodCsllAvpounls(Uge510W 4.,�Qj,7z a1s 173,020f91 4
i5 PremSntsataieAc�wnfs.;ie6cmJatedAcuvunleandPtMetdntlCeq�ounly•.....,.... .. ......,.-` ., ...'I�,�r?� ... S.8S2,233,20U
26 'RW(tq,ts24and ?Sl
WAl1.41 QF WRVF94N UNPU
OM),
s:>ixn rafrm,mriingu�tieinGkrune m.................
... ......
.... ..... .....
asp. rugs 05ai irir arm us4J a e ana .. , ... , ...
2°Ot. other
...............AM. Cash Swreder Va;ue4.� .
2J83 E9d61c1 and Uepos,ts tg pools and e4sat d xte ........ • .. , ..... . B.613,619 ,
�§•§�... .......::. 5
8tmmaryoiremarilnaWtBefnsforlG,e23hama,+ealo4tpage ........ ..... � .. .,... .;� .
2M Tart,tamps.?amn,m,,,r
1
BOND NO. 12S401124
PREMIUM INCLUDED IN PREMIUM FOR
LABOR AND MATERIAL BOND PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That
WHEREAS, the City Council of the City of Vernon, a municipal corporation, by action on the __..
day of 2010, has awarded to SAK CONSTRUCTION OF CA, LP
hereinafter designated as the "Principal," Contract No. CS-0015, for Vernon Avenue Storm Drain
Trenchless Manhole -To -Manhole Pipe Linings & Sectional Linings (,Point Repairs) in Los Angeles
County, California; and
WHEREAS said Principal is required to furnish a bond in connection with said Contract providing
that if said Principal or any of his,subcontractors shall fail to pay for any materials, provisions, provender, or
other supplies, or teams used in, upon, for or about the performance of the work contracted to be done, or for
any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Act, the
Surety on this bond will pay the same to the extent hereinafter set forth.
NOW, THEREFORE, we, the Principal and SAFECO INSURANCE COMPANY OF AMERICA
firmly
y 1 y ONE HUNDRED TEN THOU AND TWO
a5 Surety, are held and firmly UOUnd unto the City Of Vernon in file penal SUM
of
HUNDRED NINETY AND 30/100
DOLLARS ($110,290.30 ), lawful money of the United States of America, for the payment of
which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, and successors,
jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his subcontractors,
( heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions,
provender or other supplies or teams used in, upon, for or about the performance of the work contracted to be
done, or for work or labor thereon of any kind, or fail to pay any of the persons named in California Civil
Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor
performed by any such claimant, or for any amounts required to be deducted, withheld, andpaid over to the
Franchise Tax Board from the wages of employees of the Contractor and his subcontractors pursuant to
Section 18663 of the Revenue and Taxation Code with respect to such work and labor, and all other
applicable laws of the State of California and rules and regulations of its agencies, then said Surety will pay
the same in or to an amount not exceeding the amount hereinabove set forth, and also will pay, in case suit is
brought upon this bond, such reasonable attorneys' fees as shall be fixed by the court, pursuant to Section
3181 of the California Civil Code.
Labor and Material Band -1
This bond shall inure to the benefit of any of the persons named in Section 3181 of the California
Civil Code, so as to give a right of action to them or their assigns in any, suit brought upon this bond, and the
said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or
addition to the terms, of the Contract, or the work to be performed thereunder, or the specifications
accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice
of any such change, extension of time, alteration, or addition to the terms of the Contract, or to the work or to
the specifications.
IN WITNESS WHEREOF, three (3) identical counterparts of this instrument each of which shall for
all purposes be deemed an original thereof, have been duly executed by the Principal and Surety above
named on the 11TH day of JANUARY 2011.
SAK CONSTRUCTION OF CA, LP
Name 103 NORTH COOL SPRINGS ROAD, O-FALLON, MO 63366
(Attach Acknowledgment) By /
s
SAFECO I RANCce COMPANY OF AME ICA
ATTN; SURETY CLAI S DEPARTMEN"
1001 4TH AVENUE, ST . 1700, SEATTLE, A 98154
Name
(Sure )
�,. By
13y SUSAN LUPSKI, ATTORNEY -IN -FACT
(Attorney -in -fact)
APPROVED AS TO FORM:
Willard YamaguC Interim City Attorney
Labor and Material Bond - 2
- 8-6 -
ACKNOWLEDGEMENT FOR CONTRACTOR
ACKNOWLEDGEMENT FOR CONTRACTOR, IF LIMITED PARTNERSHIP
STATE OF MISSOURI }
COUNTY OF ST. CHARLES }
ON THE 13th DAY OF January , 2011 , BEFORE ME
PERSONALLY APPEARED Boyd Hirtz TO ME KNOWN AND KNOWN TO ME
TO BE THE Vice President OF SAK Construction of CA. LP,
A LIMITED LIABILITY COMPANY, DESCRIBED IN AND WHO EXECUTED THE
FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT (S)HE
EXECUTED THE FOREGOING INSTRUMENT AND ACKNOWLEDGED TO ME THAT
(S)HE EXECUTED THE SAME AS AND FOR THE ACT AND DEED OF SAID LIMITED
LIABILITY COMPANY.
Notary Public
Troy Thomas radshew
Notary Public Notary Seel
State of Missouri County of Warren
My Commission Expires 12/11/2011
Commission # 07410273
ACKNOWLEDGMENT OF SURETY COMPANY
STATE OF ......... New.Y.ork. } SS
COUNTY OF ...Nassau,,,,,,,}
On this .,, January 11, 2011 before me personally came.. Susan Lupski
....................... ..............
to me know, who, being by me duly sworn, did depose and say; that he/she resides in
... , Nassau County . , , , . State of....... , New York that he/she is the Attorney -In -Fact of the
, , , , Safeco, Insurance Co )anX of America , , . , , , , ,,,the corporation described in which
executed the above instrument; that he/she knows the seal of said corporation; that the
seal affixed to said instrument is such corporate seal; that is was so affixed by order of
the Board of Directors of said corporation; and that he/she signed his/her name thereto by
like order; and the affiant did further depose and say that the Superintendent of Insurance
of the State of New York, has, pursuant to Section 1111 of the Insurance Law of the State
of New York, issued to.... Safeco Insurance Company of America (Surety) his/her
certificate of qualification evidencing the qualification of said Company and its
sufficiency under any law of the State of New York as surety and guarantor, and the
propriety of accepting and approving it as such; and that such certificate has not been
revoked.
GRACE ACKERSON
Notary Public, State of New York
No. 01AC6111590
Qualified in Nassau Cuunty
Commission Expires June 14, 2012
NY acknowledgment
AurlkiSl,nMrr:9fr,rihe'nnr7r>,10ulUfe 5alee0lnr.uruuoCofrrp:Nyof6nrria
ASSETS
tr1 iatrilled
1 Bwda (Schacble D)
(Coll.1•ij
/sseis
2 SWca(ShedolaD):
x ,Z43,e3i
2, 826A,231
2,3u7t55,747
"
21 PrerUn-od stocky
21 CMf4n,SWK1 • • • • .. • •
•t.,,:
I . 5a,t 1y.8p2
•
d Mau;no q,•n,� rn r 2,! ctar� � ...
.�:Je l3]• ..
127 631 a73
1 ... ,..
.. ..
121k31ri�
187An3,55f
3.1 Firsiliens
i
32 OG•xu Ihan 6r,1 tutu - . ..
' . '47a1,54q
. .
30,2;C�,SLt3
4 Rae3la;c(,gdy*leA): '' ''
41 Prcper es acurad by UW axaparly {{ S ..... 0 enaurlb anOq)
42 P: peruts hed (orlle pro lncl�n d inarm. {less S
0 enwa+h(a cys
4.3 Pmper6eshedlors 9(Iesn;
5 Cah(3 123,13 9 schbdu!-E-Palli,castDatpN(S
s .. ) rxWlrr>lanI5 (6,N.412r
.. ,. .
:dreduHE-F'b1Yl,xfdsfiorJ•krtninvc,Gnents(� tf3.93J3,IG2,S-Jx'du'�DA)
G, Ctailradbais(Ndudng&
xl'G{G639'i
„267,an3,760
7. Gtlmrklr�stedasseLt{Set�ureEA)•• Oprt�Vumflo'A5J
tr RroS v as fa secur gas
7Q,521,lj45
: , .. f CO& W7
�r1,516,61¢
. . 3q,6J,3,' r�g
9 AWropla 4�' a.Inp far Inve"M,i as Ljs . , . . . .. .......
.:., .... ,
,a 6ubW-Ids, oah and favftw Nsseis p'' I to J . ...... . .. ... ..
H. flCapianlslessS Odr - •. ,..
off (la Tide insurers only]
�•(j(%?19,i09
.. 1Jy1s(DD�
-
„�,`y�(Qd43,1b9'
2,951,'.,31,i1d
....... ,
12 Irres4nenl fitrwme dire and axfut:d
... ,
, ..
.
ia. I M10afa trttd 0on9kleratious;
3822I A3B
3827l936
... ......
13.1 UncaJegedp[C�ntiums�da9�ntsJrYxslnJheooUrseatOolJ¢dioe
132 D*4MprdlVuw.agents'hzlatKksondinsltllSnentxkeaku(bUfdefetthd
„ .O'ltJIA!
QfdT,506
u6,?i1355
78p,278,446
arkf nfd yMdue (yx2,Wlas g (ip,761.d2(j rammed butunbFletl.pn!mums}
13.3 A—Wrelra3�premium
. 427.ai6,
14. Retmure cw
$s?1, 2
... , . .33
14 A Arnounls ww mrailie fiahi rNAsn(ers
14-1 Funds held by orde Aed uiHl reMaYued r�rhJwflla
61.tr 92 q
¢{,16923➢
26s,224,740
14,3 O6ty enr917Jd§roca[Mbla Underrefneurance CaiJrads .. ......... ...•.
1i nfnourltsraelAlbMi,3
... ...'•...
...,..•.,
6tourjMUredplanx,
i 6.1 Canrnl Ce;i" and %7 Jnmmb W rtNx>1anle and 1n t�9lUtamoil
, ....
. ........
.... .
� .
1G2 NetUuWred, axuS Pl ......Ix?2?�582
17, Owxrxltyfunde'fdoe{vahfecrmi} ptis(j ..
i�Lyf�,7Up
_..41MON10(,838,A�
,. 1?326,667�
i695(§
16. Gkxtrgric dale praoeasl l� a ltdpuJenl and svRvrafe
is. Ftvr6bua mW W. ttprtgfil Inuturlihy hea6h•r�fa rla6vety assets ($'
$��i�?e
: � '�
.. ,04 k(5,1G5
� 19,9�9
...... 70Q
gg 94s
'�
(I
20. Nn[adjf>56nehllAass'a14Ws1J1abU16o3drlet9fer4ign ew;iiNny"ordtes ...... , .) . • ... _
.....�.893,6Gii
...¢ ,'�1.ax..
....
a�
21, ReceNrablesFmhlD9relJl.eubsxlarfusRrsdaffdaf ... ......
{ 0)arrdouJer �namisrrssa�ua6(e
A!
... , .!.Q
....
eJ1a s.. .....I.........
r thanInveatettasap . ..
....?•
.
.....S..i6010
24. Tp1al.�ts�tudin9Acsauhf,.Se9reAatedlcocwntsand , .. ... - ,
2/,167,
241, ,.
.....:......
2.3625i8
POvAOU Cell Acounis (Um in to dJ}
.. .
2 Fram•Snlskcwnls.SepcvyaleuAwounL�mUPIMc(rxIGeUFirmunty
AQI'??b
173u2�,fi$1
„A!),�{rt?1
3.852233206
TOW(tlnati JAnnN2R1. ...,.....
.___:__
..
INSURANCE SCHEDULE (CONTRACTOR)
Contractor shall provide and shall maintain on file with the City proof of insurance, including but not limited
to, a standard certificate of insurance, in at least the following amounts and coverage (combined single limit
permitted):
I• Coverage and Limits
Bodily Injury Property Damage
Hazards Each Person Each Accident Each Accident
Automobile Liability
Owned Automobiles
Hired Automobiles
$ 500,000
$1,000,000
$ 500,000
Non -Owned Automobiles
$ 500,000
$ 500,000
$1,000,000
$1,000,000
$ 500,000
$ 500,000
Workers' Compensation
$ Statutory
Employers' Liability
$1 000 000
per employer
IL Liability
General Liability
Premises Operations
$1,000,000
$2000,000
$1,000,000
Elevators (If Applicable)
$1,000,000
$1,000,000
$2,000,000
$2,000,000
$1,000,000
$1,000,000
Independent Contractors
Products - Completed Operations
$1,000,000
$1,000,000
$2,000,0,00
$1,000,000
Contractual Liabilit
$1 000000
$2,000,000
$2,000,000
$1,000,000
$1,000,000
Umbrella Liability
$2 000 A-
$2,000,000—
$2,000,000
a. The general liability policy shall contain
the following special endorsements which shall be noted
or attached to the standard certificate of insurance:
on
t An original endorsement naming the City of Vernon, its elected officials, officers, agents,
employees and volunteers as additional insureds under the policy.
2. An endorsement providing the City of Vernon thirty (30) days notice of cancellation or
material reduction of coverage.
3. An endorsement providing coverage for all operations under this Contract and specifying the
activities covered.
4. Such other endorsement as may be required by City.
5. A copy of your general and umbrella insurance policy declarations page.
6. A copy of schedule of forms of endorsement.
b. In addition to the above, the Contractor shall provide such further proof of insurance documentation
as the City deems necessary.
DOCUMENTATION REQUIRED
• Certificate of Insurance from contractor's insurance agent;
• Copy of insurance policy Declaration Page for General and Umbrella Liability;
• Actual copies of any Endorsement;
• Additional Insured Endorsement naming City as Additional Insured, Form CG 2010-1185 required;
• Contractor's insurance package to include Endorsement appropriate to the project being undertaken
on the City's behalf,
• Copy of Schedule of Forms and Endorsements
- E-7 -
PROOF OF INSURANCE
APPROVAL AS TO FORM
Proof of the following insurance coverage has been received and approved as to form:
(1) Contractual Liability.
(2) Automobile Liability.
(3) Worker's Compensation.
(4) Employer's Liability.
(5) General Liability.
(6) Umbrella Liability.
Dated:/
r.
Willard Yam g i, Interim
City Attorney
- E-8 -
(BANK OR SAVINGS AND LOAN ASSOCIATION LETTERHEAD)
Date:
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
Gentlemen:
S
A
M
P
L
E
IRREVOCABLE LETTER OF CREDIT
Contract No.
Please consider this letter as an Irrevocable Letter of Credit pledging that in
the amount of $ is/are deposited and guaranteed to insure the Contractor's faithful
performance under Contract No. in lieu of withholding any funds due the Contractor under
progress payments. In compliance with Part 5 (commencing with Section 22300) of Division 2 of the
California Public Contract Code, we agree that the funds or other securities designated by this instrument
shall become trust funds for the purposes set forth in this instrument. This instrument shall terminate upon
formal acceptance by the City Council of the City of Vernon -of the work performed .by the Contractor under
said Contract.
Any claims under this Irrevocable Letter of Credit shall be presented in the following manner:
The City's written statement, signed by the Director of Community Services,
certifying that there has been loss, damage or liability resulting from the Contractor's
duties and obligations under Contract, or from negligence, act or omission of the
Contractor, its agents, servants and employees (such statement to be substantiated by
an attached detailed report) in the amount of the accompanying sight draft on us and
that the amount of this draft is therefore now due and payable.
The above statement will be all that is required to certify the amount set forth under this Irrevocable Letter of
Credit, dated this date, is due and payable to the City of Vernon pursuant to the above -stated Contract No.
(Name of Bank or Savings and Loan Association)
By
President
By
Secretary
ALL SIGNATURES MUST BE NOTARIZED
Attach proper jurats
• Securities as listed in Section 16430 of the Government Code, or bank or savings and loan
certificates of deposit.
- E-9 -
SPECIAL PROVISIONS
F. SPECIAL PROVISIONS
I. GENERAL
STANDARD SPECIFICATIONS
For the purpose of this contract, the "GREENBOOK" STANDARD SPECIFICATIONS FOR
PUBLIC WORKS CONSTRUCTION (Latest Edition), the Standard Plans for Public Works Construction
(Latest Edition) shall apply.
EXAMINATON OF THE SITE
The bidders are required to examine the site and judge for themselves the location, physical
conditions, substructures, and surroundings of the proposed work.
MOBILIZATION
The cost of all preparatory work and operations for the multiple movements of personnel,
equipment, supplies, and incidentals to the various project sites must be included in the various bid items,
and no extra compensation will be paid to the Contractor.
TRAFFIC CONTROL
The Contractor shall submit traffic channelization and detour plans to the City Engineer for
approval at least ten working days prior to commencement of work. One lane in each direction shall be
maintained on all streets and the Contractor shall provide access to places of business at all times.
Flashing arrow boards shall be used on Vernon Avenue. The traffic control shall be in accordance with the
Work Area Traffic Control Handbook (W.A.T.C.H) or California Manual of Temporary Traffic Controls.
Traffic Control Work shall include all labor, materials, tools, equipment, transportation and
incidentals necessary to maintain and control all vehicular and pedestrian traffic through the construction
site. The cost of furnishing and maintaining traffic control during the construction must be included in the
various bid items, and no extra compensation will be paid to the Contractor.
PROHIBITED PARKING IN WORK AREA
Contractor shall provide the City with 72 hours notice for parking restrictions that will be posted in
the work area during construction. All traffic and parking signs are to be provided and posted by the
Contractor. All signs, lights and other warning devices used shall be in accordance with State of California
Business and Transportation Agency Department of Public Works Manual of Warning Signs, Lights and
Devices for Use in Performance of Work Upon Highways.
The cost of furnishing and maintaining signs, lights and warning devices during the construction
project must be included in the various bid items, and no extra compensation will be paid to the
Contractor.
CONSTRUCTION SCHEDULE
` At the pre -construction meeting, Contractor shall submit to the City, in writing, a
construction schedule of proposed work. The construction schedule shall show sequence of work,
- F-1 -
SPECIAL PROVISIONS
critical path and estimated time for completion of each work. The Contractor shall give 48 hours notice to
the Director of Community Services & Water prior to the start of the work.
In addition, the Contractor shall submit a detailed schedule forecasting two weeks of work
describing each day's work. This schedule shall be updated and submitted to the City every Monday
during the construction period.
CONSTRUCTION HOURS
All work shall only occur on Monday through Friday between the hours of 7:00 a.m. to 3:30 p.m.
If the Contractor elects to work at other times, it must obtain Director of Community Services &
Water's approval and pay for the inspection fee of $50.00 per hour per City inspector for a minimum of 4
hours.
CONSTRUCTION SIGNS
Two construction signs shall be built according to Standard Plan MV2217 (see attached page F-7)
and shall be placed at each end of the construction limits on Vernon Avenue. The signs shall be placed
two weeks prior to the commencement of construction. The wording of each sign shall be approved by the
City prior to printing.
CONSTRUCTION ACTIVITIES COORDINATION
The Contractor shall notify the City of Vernon Community Services & Water Department, Police
Department, Fire Department, Utility Companies, Railroad Companies, Business/Property Owners and
Metropolitan Transportation Authority of the proposed work and coordinate all work under this contract
with all Utilities and Public Agencies.
MATERIAL SUBMITTALS
The Contractor shall provide all required submittals including, but not limited to shop drawings
and materials to the City upon reward of the contract for review and approval before the construction. The
"Notice to Proceed" wilf not be issued to the Contractor until all the submittals have been reviewed and
approved by the City.
PUBLIC CONVENIENCE
The Contractor shall conduct operations to minimize the obstruction of access and inconvenience
to the public and businesses.
TEMPORARY WATER METER
Contractor shall obtain a temporary water meter from the City of Vernon Water Department by
placing a deposit of $600.00. Contractor shall pay for all water used. Contractor shall not relocate the
service. The Contractor shall call the City of Vernon Water Department to relocate the service and will be
charged $50.00 for each relocation.
- F-2 -
SPECIAL PROVISIONS
PRIVATE OR PUBLIC PROPERTY. DAMAGE
Any damage to private or public property caused by the Contractor shall be repaired or replaced at
no cost to the City. Repairs and replacements shall be at least equal to existing improvements and shall
match in materials, finish and dimensions.
CLEANING OF THE SITE DURING CONSTRUCTION
During construction, all pavement, sidewalk, curb and gutter adjacent to construction areas shall
be swept free from soils, gravel, dirt or debris on a daily basis. The Contractor is responsible for
maintaining sidewalk and pavement within the construction zone free from loose materials at all times.
STORM WATER POLLUTION PREVENTION PLAN (SWPPP)
Prior to Contractor commencing work, a City approved Storm Water Pollution Prevention Plan (SWPPP)
shall be implemented, and maintained on file at the construction site to comply with the Vernon City Stormwater
Code. The Contractor shall develop and administer a SWPPP. The SWPPP shall be prepared by a California
Registered Civil Engineer and considered as part of these Special Provisions.
The Contractor shall submit a SWPPP for review and approval by the City before the construction
commences. The Contractor is notified that the SWPPP may require revisions from time to time during
construction to reflect needed improvements to best management practices (BMPs) and/or actual construction
practices. The SWPPP document shall include, at a minimum, all items in Section A of the State General
Construction Activity Storm Water Permit.
l The SWPPP document shall not be construed to be a waiver of the Contractor's obligation to review and
understand the State General Construction Activity Storm Water Permit before submitting a bid. By submitting a
bid, the Contractor acknowledges satisfaction as to the requirements of the State General Construction Activity
Storm Water Permit.
No storm water quality complications are anticipated from this construction project; however, if a
problem develops, the Contractor shall comply with all the conditions contained within the SWPPP and the
Vernon City Stormwater Code. If an unauthorized stormwater discharge or a violation of Vernon City Stormwater
Code occurs, the contractor's superintendant (or his/her designee) shall immediately notify the City of Vernon
Health & Environmental Control Department. Any additional work required for compliance with the requirements
of the SWPPP and the Vernon City Stormwater Code shall be performed by the Contractor.
SWPPP preparation guidelines.are available at the State of California website:
http: wwwm
.waterl)oards ca gov/water issues/progras'stor�nwater/construction shtml
The Contractor is hereby notified that specific construction practices in the Standard Specifications,
Section 7, "Responsibilities of the Contractor" are considered to be Best Management Practices. Applicable
construction practices in the Standard Specifications shall be incorporated into the SWPPP.
All payments and full compensations for preparing and administering to conform to Contractor's best
management practices (BMPs) and/or actual construction practices for Storm Water Pollution Prevention Plan
(SWPPP) and Vernon City Stormwater Code shall be included in the various bid items of work involved and no
additional or extra compensation will be paid to the Contractor.
- F-3 -
SPECIAL PROVISIONS
SANITARY FACILITIES
The Contractor shall furnish and maintain sanitary facilities by the worksites for the entire
construction period.
UNIT PRICES
All costs not covered by specific unit prices but required for a complete job, shall be included in
the items most related to the work.
EXISTING OFFSET MANHOLES ON VERNON AVENUE
Existing manhole number 1, 2 and 3 are the offset manholes located along the northerly sidewalk
of Vernon Avenue just east of Soto Street. All costs related for working inside the existing offset manholes
to install new pipe linings shall be included in the unit prices bid for the various related items of work and
no additional compensation will be made therefore.
ADDITIONAL PIPE QUANTITIES
There may be additional cracks in the existing storm drain main line (VCP) pipes. The City
shall decide if any additional linings are required for new cracks after reviewing the Contractor's
newly taped CCTV inspection video. All additional pipe quantities shall be paid by the
corresponding Contract Bid Item unit prices.
II. TRENCHLESS MANHOLE -TO -MANHOLE PIPE LININGS & POINT REPAIRS
Trenchless storm drain pipe lining.shall conform to Section 500 of the 2009 Edition of Standard
Specifications for Public Works Construction "Greenbook" And Its Supplements Except As Modified
Herein.
Cured -In -Place Pipe Liner (CIPP) shall comply with Subsection 500-1.4 of the Standard
Specifications for Public Works Construction.
500-1.1.1 General. (Add the following paragraphs)
The CONTRACTOR shall field verify the pipe diameter at the manholes and lengths prior to
ordering liner materials. The CONTRACTOR shall notify the Director of Community Services and Water
of any discrepancies between information obtained in the field and existing plans.
Installation of the storm drain lining shall be performed by a CONTRACTOR licensed by
the manufacturer/owner of the process. Bidders are required to submit copies of such licenses with
their bids. A bidder's failure to do so shall render their bid non -responsive.
The minimum finished pipe liner wall thickness shall conform to Table 500-1.1.1. (A)
Table 500-1.1.1 (A)
-F-4-
SPECIAL PROVISIONS
All costs involved with lining shall be included in the unit prices bid for the various related items
of work and no additional compensation will be made therefore.
500-1.1.4 Cleaning and Preliminary Inspection (Add after the first paragraph).
The CONTRACTOR shall assume that the pipes require normal cleaning of two (2), three (3) or
more passes of a jet cleaner before CCTV.
500-1.1.5 Television Inspection (Modify by adding to first paragraph in Subsection 500-1.1.5)
All original video tapes shall be submitted to and will become the property of the City.
Video tapes shall be recorded on a DVD recorder on (SP) standard play speed.
(Third paragraph is replaced with the following):
Pre -lining CCTV inspection shall be performed utilizing a rotating lens video camera.
The pre -lining video inspection and recording performed with this camera shall stop at each lateral
and the head rotated to look up the lateral to identify if the lateral is active, plugged or has roots that could
interfere with the complete lateral reinstatement. The pre -lining and post -lining video will be performed
while the upstream lines are plugged or bypassed. The line shall be dry except for flow from the laterals in
the section of line being televised. Post -lining video will be performed only on liner installed sections of
the pipes.
The contractor's method of by-pass shall be approved by the City Engineer prior to the start of
work. The cost for by-passing (if any) live storm drain water shall be included in the various bid items, and
no extra compensation will be paid to the Contractor.
500-1.1.7 Miscellaneous (Modify by adding the following):
(a) Service Connections (Add the following paragraphs)
Protruding Laterals. The CONTRACTOR shall assume that there are no protruding laterals unless
it is noted in the special provisions, TV log sheets, or video tapes made available to the CONTRACTOR
before the bid opening. Prior to insertion of the liner, the CONTRACTOR shall cut-off interfering
identified protruding laterals as close to flush with the pipe interior as practicable.
To prevent maintenance problems such as roots, infiltration, ex -filtration, or loss of backfill
material into the newly lined pipe all plugged service connections identified in the pre -lining video tape
shall not be opened unless specifically directed by the Director of Community Services and Water in the
special provisions.
(Replace the fourth sentence in the second paragraph with the following).
The service opening shall be reinstated from a minimum of 95 percent to a maximum of 105
percent of the original service connection.
(Add to the end of the second paragraph).
- F-5 -
SPECIAL PROVISIONS
The lateral opening cuts shall conform to the shape and size of the inside diameter of the existing
service connection.
All final lateral cuts shall be finished off with a wire brush to remove chips and provide a smooth
opening.
500-1.2 Pipeline Point Repair (Add to 500-1.2.4)
The new point repair liner shall overlap at least one foot at both ends of cracked VCP pipe joints.
500-1.4 Cured -In -Place Pipe Liner (CIPP)
500-1.4.6 (Modify by adding the paragraph as follows)
The curing water used for the CIPP lining.shall not be discharged onto the street surface or
concrete gutter or into the storm drain catch basin but into the sewer manhole.
500-1.7.5 Chemical Resistance and Physical Testing. (Modify the last sentence of paragraph as
follows):
Proof of meeting these requirements shall be submitted with the Contractor's Bid.
500-1.7.6 Installation and Field Inspection (Replace paragraph with the following):
�., Before installation, the pipe coils shall be checked by the inspector to verify compliance with the
minimum wall thickness.
500-1.7.7 End Seals (Replace the paragraph with the following):
After installation, the liner shall be cut off in the manhole. The cut shall be smooth and parallel
with the manhole wall. The finished liner shall not protrude into the manhole over one (1) inch.
If a manhole has been lined through, the top half of the liner pipe may be cut off even with the top
of the shelf leaving the channel lined. Compensation will be made by linear feet of corresponding pipe
lining Contract Bid Item unit prices.
- F-6 -
G . STANDARD .PLANTS
r
s)a
CITY O'F VERNON
CONSTRUCTION PROJECT
PRQJE'CT NAME
4I-0„
SCHEDULED TO BEGIN
s,--o„ DATE
A,M. TO P.M.
EXPECT .TRAFFIC DELAYS
s"
61
NOTES:
1. ALL FRAMING LUMBER TO BE. ,24 x 6" S4S D.F.
2. ENTIRE . SIGN, INCLUDING. FRAING, TO QE PAItM
WITH TWO COATS Or EXTERIOR OIL BASE WHCiE PAINT.
3. L.EMRING TO BE DONE -AN BLACK BY QUALIFIED
SIGN PAINTEW AND TO THE SATISFACTION OF THE
EjJGIN�ER,
4, SIGNS TO BE MAINTAINED IN A CQNDITION SATiS—
FaMRY TO THE ENGIN'MR.
5, SIGNS TO BE FURNISHED BY CONTRACTOR AND IN—
'i'AL,LED AND MOVED BY cON OTOR AS , DIRIwOtD
BY THIS ENGINEER, NO.00NMU01ION SHALL Com -
MENCE ' UNTIL SIGNS ARE IN PLACE.
.ST'ANDA.RD, CONSTRUCTION SIGN
orry, OF VERN0
�ill!H:.19 STANDARD PLAN
M , 1 `'
1
` 1
---
---
•�.�JI.,IfiliOwt.o.G1.:..yyn,r•... w. /
1 x.far ae.
�'TGRf�I DRAIfa P�
1
1
r-fCdr,�W LM
Ey.In► a►/ f�..lw+t,
\ I M j .IHsl.ua
NI
INN.afr
,arcs-rha. z.
— — --
ns,fs.
1' I
1
1
1 ,
1
11
I: jer,7 = !. s1LIAlAI �►p.I>rltY^� 1•. •i. \��
1
,TfN1Ys/r�f. • ii'x. �..IY C j BAN
1 p
I
I.
sa
1 p1
1i0 a �� �•r'�" .
p 1 K1l,P! li; �-
-r 8fal,twb•,•rrem.
I
I.• • I p � 1cliat!
1
• 1 pl 1•
r 1 MI�
�� y 1 Y.1 LAN i.Y/f•afcth.r i
a I .. sorc ok..
- 1
1
• r -
:= 1 M
ZI ��� %�• ' '>Li ' 1 p l
I! 1 I arrrFe'a.r.�. L I I
1 I 1 Al
•� 1 lh �
R rw c.v w.r
s.ar'f.ww,.: 1 p fat'tj''�!u'•'r .•t?'
I p ♦l yl,,,r�er w• .,
it 1 p 1 Avo Wf
•I I
I yw,jtr •..9.7 I
1
vpM s/
a..rs-.�add.�+..:r• pr�►,riA•.a, .�•:.•:�w:,Ar.r-i ,s1
ir,wwsar:-
1 � M
a� 1
f ,
1 11
,
,
1
1
1=N'1:•
1 ArA! ,mow
1 �
1
,p
� .rr� CmiA-:.c: • » •70.• :f R1sALC/ M i {M, �xd
M
1
11 A 1
' JWAkWAIP
-
�vr� I G.WiL¢ is
- �(lfrM,I7MioR t•p'e�ed'°''r.w / ,Wi! f%Wkr.TvR' �. � "�
r�i�a��.Q1�wr.lMwap/ G��' Gnd�Orc:.t�lS:alvA' � �
NJ p'au
vpjw-
Ap
IL
a
aai a..er s rc a�
a�sr�.ar�•gw _
Abl+Tro 1 t
A 4.�
,
•r/truas � '
1 I
I Y--Irmo I
I
1
-� c As�a� iv__ •— — -
u>arrs I
r
Ic,torAl9 i � KA410P I I
1 �
v
ATAI Aj�+•I
-a-----
1 ' -
1 _, KrrYl•3
1'
KNat3
1 �
,
r � _
Caw"
r . w7.3 Mf►f0
�a rr•air��OH 4
"o u .-ra I.
M�
Ad+w. ds GIda9 � I I
I I
,
1
.f2,y
1
y
0
1
rA • �..
N
N
1
Iwr r,.wr • d
si
.
i
A,,.:.;�
•1-t
>�9-r5rc
p
i�
jf./Itlb
1
TL
1'
ca rfa
i
SO
o
�. x
r-
_ 9'•
ai•rsey�+'r
.�,,,, ,-.raffia
,
ieNaa-:'.re
14
1'
ML•,. da. 4;.,CQ9
,.
r
1 '
1 �
1
1
1
iYYb•dY._I'Awa �Nfi
r-,.m
j
1'
,
�+�war•
-
N
VAM
1�
1
1
1 ;
iefr 7ii7, c-ss••o
1 � rc%•�xr
Nitoym+++l � 4•
s
y ,
N (�
�e $
o^ ; k
N
. Aurlhi ra U e •pear 2m.q ui the Salec� Imunnca Corr�uny of Mrr_ria
ASSETS
4
Mdndn,�rd
\
1
rrrnaCnle^d
Assets
Asses
jcoi . 7 .2j
NelAft1w
165Cis
2 SbLtS PIMCW D);
2a�,2U3,n31
2, 8266,834
2,au7 265,7ti7
2I Prefer:cdsb:sm
2-2 W'DiMm'sbc s .. ... .. ......
1
d AtgUvokv,•vlcrn mat e=[ar�;�e,.�„icEj•
107,407,551
3.1 FhIGea 't
1
32 cow tha,'IErlCure
?A,7,3ZR
.. ...
?0,232,Slli
4 Rare MUTA (file A); - • . .. .
" Propeniev eceupred by dw n�npa,ly (lets S .. .. 0 encumbrances)42 .
P.cQp�Je9hedforlltpoduondina�v(fessS
4 OentuadNr¢Y�)
1'mpetiestledlwsaleilessQ 0aicumtruntetj
ail{$ 123,136,99T, Schodule E-Prvl i),wst erlulvr�15 (E 5,t{a,,4t2,
..
...
...
Sduxlub E • Pki 21, aid shod•121M inveslrneniis {3 log Schedu'4 DA
6. Canrregbass('vhdudingI 0 )'
„_329
!,ae3,750
....f>rt�tuumnatas)
7. Ctherkivasted aesels (Swl°dd a EA)
_
..
.
B. Rcoer+'>t>i'<afasPcurl9ra .. ..
79,521,l1(5
7, l`rJ6,�
� i B S 6,D4S
'(
.....+1
9 lu�gwiu Wu a&u far InveStod
ft, POD gantsleses 9edafl(farTilk nsurereonlyj
12 kresPnanl�aomedueandacaued
3.bji�l9,ig(:
.. •..,...,
IMP
¢i&443.t�o
2,95Q,1,1{d
13. Plem ins atd wnskieratio-ls: ... .... • • •
aJB227B
.. ..,
88?2T ii3R
"34 077r369
13,1 Uncaleciedprem ums orld agen{s fntces to the oourseaf oollecr na
13z DefehEdlmri7fums.agents'r�zlalKx+sontllh�tllYnenl,�k�akedbUtdafcrccd• .,
.SQ�,Boi
9657506
,gq,221356
,. 380,?781uF;
2fdnalye[due(tMrudirgg tt0.70142YJemedbutunbllea.prethiuMs)
13.3 Aral relroitsedivepremiums
t27a3S, 0
(Val
42Tpai,jJ1
276,r67j757
14. Relnsuranee: .... . , .. ... .. , .
2.821,(g2
.. , . . 23
.. , . Z r67y113
0.
14.1 AMnl.9r'eraCverokiefMMreNW, ft
142 Funds held by ardapaa!(ed v�th rePosnied r mna�ll¢s ..............
....il,I%ZD
�(,1GE?�30
266224 7Atl
... ,
14,3 C61er Q rsrftgt A CalVabla under reTne(ua lce f7G41fdCi5
iS AmwtdsrQcelvabrb re>AunSllo uryruured plsnx .. ......... .....
. . . ..... •
, ... , . .
...Ties jz
Ml Current 7edefel bnd ' n In fe " "' .... '
oWr(�t1�Ca1Ytal9eandln4etOgldwJrGi1
16.2 Net ws4Rred i& 84
• .... .�•..
3Z ,
, .... , .
... ,
.... .......
..:...
i8,88
17. 0 rlarartty funds'FUaeiYalde�rm ... .. ...............
ik.jlosit
16, Fl�trgricdoh pimmkiyeqtgWotandsofh�re .
r,..
"it^a325
1ry{ ��
....{�r+r+�',,•�,4,
( §fig
,10(838,8'f1{,,
19. FIUMAaetltlMfdptnB111klaludTlf�haeNh.r�fa ........ . .
da8mryasscts($ �)
�!' 6 5
01, r',j6S
Q2i1,71i6
AMR20.
Naiadjustrn°nllAassetegpol ....
18asdU9tvtoel@newiuul erdl�s
1�,693G66
A.kpG
j
21. Reter able9 f f JA p iiClll, 64bs7diadCs Atrd Afti5a#
Aeal9tcaa(� • ,
173regala+sl8.eAns for othCrtl,aninvaatedaehp .. ..
..• ......
.............
....•
•
,
24 Total.�sal5 exduditrgSePrati3AcctnrhU.S¢gTeA /�aoUdtsasd '
zf,187,
6291f8d
1 i8�ta
2,U25 '
Pmtacied CaU Axvunls (Llrre5 74 M 2�
Fmrn•Sn1>arSrNaawnts.e8cugatetlluzowrl�mUPh�leGrxlCedounlx .....
. A¢(,?A?16
.. 1?Q24,fi8i
lt{?�
5.95¢233,206
2&_7Ual(Unal:7Aanr1z5t' •,..
_.
.'•.
0
LIABILITIES, SURPLUS AND UTHERFUNDS
-------'------------------- -
| -i_---�
� |
KRIM
`
°`
�
^^
Aram
'�---`'�------.._.---� .----`.-`-.
,xx___~^ '---~^-----^-' ---' ,__..... ....... ��« ' '^---^--~` ''--.L-'-__ -T � -'-'~>
20
CAL
CITY OF VERNON
COMMUNITY SERVICES & WATER DEPARTMENT
CONTRACT CHANGE ORDER NO. 1 SUPPLEMENT NO. SHEET I OF 1 SHEETS
PROJECT: Vernon Avenue Storm Drain Trenchless Lining & Point Repair P.O. No. 011.0006642
TO: SAK Construction of CA, LP CONTRACTOR
REQUESTED BY: City of Vernon
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and
conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally
included in the contract
After reviewing the videos, deteriorated 2 1 " diameter storm drain pipe along Vernon Avenue and 8" diameter
sewer pipe along District Boulevard which are not part of the original bid items are also needed to be
realigned.
Bid Item No. Descriptio Quantit Unit Cost Total Cost
(11) Install 2 1 " new liner between Manhole # 10 to #11 711 LF $ 158.00 $ 112,338.00
(12) Install 18" new liner, sectional lining -point repair 8 LF $ 400.00 $ 3,200.00
(13) Install 8" new liner between Manhole # 7 to #.11 1,231 LF, $ 38.00 $ 46,778.00
(14) Install 8" new liner, sectional lining -point repair 92 LF $ 250,00 $ 23,000.00
Total Amount of this Change Order = $185,316.00
Final Change Order No. 1 cost will be based on the actual amount of work performed in the field.
Contract Amount (Base Bid) ..........................................
$
110,290.30
Amount of This Change Order
...................................................
$
185,316.00
Amount of Previous Change Orders ................ I ........................
$
0.00
Total Change OrdersI .....................................................
$
185,316.00
Modified Contract Amount
............................................
$
295,606.30
By reason ofthis change order the time of None
completion will be adjusted as follows:
Approved: Date:
Dor o I ARY Se i ces & Water
Attest: Date:
WiJrairb Ya a chi, City Clerk
onsideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
We, the undersigned Contractor, have given cUd,
labor, equipment and materials, including ovexcept as may otherwise be noted above, and perform all services necessary for the work above specified, and
will accept as full payment therefore the prices shown above. r
Aedc te: �/ �� Contractor: C cm— 2 ��
d,Azrille: 1 J Ldv_�f
c. riujcUrrlit;/k ivau01/1'urc1145� Rev.06/09
STAFF REPORT
COMMUNITY SERVICES & WATER DEPAR
The City has awarded Contract No. CS-0015 to SAK Construction of CA, LP (SAK) for the
lining of certain sections of the Vernon Avenue storm drain. As part of their initial work SAK was
required to clean and videotape the storm drain line. The Closed -Circuit Television (CCTV) video
recorded and submitted by SAK for the Vernon Avenue storm drain from Soto Street to Alcoa
Avenue has showed additional large cracks in a 21 diameter storm drain pipe section. When the pipe
was videotaped in March 2005 (over .6 years ago) this .deteriorated pipe was not identified. In order to .
reduce the potential for vehicle (heavy truck) wheel load related damage or failures, it is
recommended that this section of pipe also be lined. One section of the pipe next to Farmer John's
driveway collapsed (crushed) in April 2005 and was replaced with a new pipe by the City crews.
In addition to the aforementioned. repair, a section of the District Boulevard 8" sewer pipe
between Heliotrope Avenue and Slauson Avenue (about 1,231 linear feet) is. in very poor shape and
also in. need of pipe Lining and point repairs.: While this was not included in the original scope of
work, SAK is offering a very reasonable lining price of $38.00 per linear foot including cleaning and
CCTV.. Staff is recommending that this deteriorated section of District Boulevard's 8" sewer pipe
repair be added into this Contract.
Currently, the cost estimate for the removal and replacement of a 21" diameter storm drain
pipe at about 6 to.10 feet deep in the ground will be about $300.00 per linear foot. SAK's proposed
price for trenchless lining of the 21" storm drain pipe is $158.00 per linear. foot. Similarly, the cost to
replace an 8" sewer line 6 to .10 feet in the ground is approximately $150.00 per linear foot. SAK is
proposing to line the pipe for $38.00 a linear foot. The cost differential for the Change Order No.1
will be $185,316.00 for trenchless lining vs. $414,150.00 for removal and replacement of the pipe
which means a savings of $228,834.00 (or) 55:25%.
Given the extremely poor condition of the pipe segments and cost savings, I recommend that
Change Order No. 1 be approved and issued to SAK Construction LLC, and that funds from Account
No. 0,11.100.150 be utilized to construct :this :improvement. during this financially challenging time.
This fund has approximately $2.5 million that can only be utilized for street improvement purposes.
RECEIVED
MAY 12 5 2011
CITY CLERK'S OFFICE
4 CF vER
S�VEL1' IN�V�
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: Mark Whitworth, City Administrator
FROM: Samuel Kevin Wilson, Director of Community Services &Water
DATE: May 25, 2011
SUBJECT: Contract No. CS-0015: Vernon .Avenue Storm Drain Trenchless Manhole -To -
Manhole Pipe Lining & Sectional Linings (Point Repairs) -` Change ,Order No. 1
The City has awarded Contract No. CS-0015 to SAK Construction of CA, LP (SAK) for the
lining of certain sections of the Vernon Avenue storm drain. As part of their initial work SAK was
required to clean and videotape the storm drain line. The Closed -Circuit Television (CCTV) video
recorded and submitted by SAK for the Vernon Avenue storm drain from Soto Street to Alcoa
Avenue has showed additional large cracks in a 2 1 " diameter storm drain pipe section. When the pipe
was videotaped in March 2005 (over 6 years ago) this deteriorated pipe was not identified. In order to
reduce the potential for vehicle (heavy truck) wheel load related damage or failures, it is
recommended that this section of pipe also be lined. One section of the pipe next to Farmer John's
driveway collapsed (crushed) in April 2005 and was replaced with a new pipe by the City crews.
In addition to the aforementioned repair, a section of the District Boulevard 8" sewer pipe
between Heliotrope Avenue and Slauson Avenue (about 1,231 linear feet) is in very poor shape and
also in need of pipe lining and point repairs. While this was not included in the original scope of
work, SAK is offering a very reasonable lining price of $38.00 per linear foot including cleaning and
CCTV. Staff is recommending that this deteriorated section of District Boulevard's 8" sewer pipe
repair be added into this Contract.
Currently, the cost estimate for the removal and replacement of a 2 1 " diameter storm drain
pipe at about 6 to-10 feet deep in the ground will be about $300.00 per linear foot. SAK's proposed
price for trenchless lining of the 21" storm drain pipe is $158.00 per linear foot. Similarly, the cost to
replace an 8" sewer line 6 to 10 feet in the ground is approximately $150.00 per linear foot. SAK is
proposing to line the pipe for $38.00 `a linear foot. The cost differential for the Change Order No.l
will be $185,316.00 for trenebless lining vs. $414,150.00 for removal and replacement of the pipe
which means a savings of $228,834.00 (or) 55.25%.
Given the extremely poor condition of the pipe segments and cost savings, I recommend that
Change Order No. 1 be approved and issued to SAK Construction LLC, and that funds from Account
No. 011.100150 be utilized to construct this improvement during this financially challenging time.
This fund has approximately $2.5 million that can only be utilized for street improvement purposes.
SKW/pc
Enclosures
CITY OF VERNON
COMMUNITY SERVICES & WATER DEPARTMENT
CONTRACT CHANGE ORDER NO. 1 SUPPLEMENT NO. SHEET 1 OF 1 SHEETS
PROJECT: Vernon Avenue Storm Drain.Trenchless Lining & Point Repair P.O. No. 011.0006642
TO: SAK Construction of CA, LP CONTRACTOR
REQUESTED BY: City of Vernon
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and
conditions of the original contract remain in full force and effect, and apply to the additional workas if said work was originally
included in he contract.
After reviewing the videos, deteriorated 21" diameter storm drainpipe along Vernon Avenue and 8" diameter
sewer pipe along District Boulevard which are not part of the original bid items are also needed to be
realigned.
Bid Item No. Descriptio Quantit Unit Cost Total Cost
(11) Install 21" new liner between Manhole # 10 to #11 711 LF $ 158.00 $ 112,338.00
(12) Install 18" new liner, sectional lining --point repair 8 LF $ 400.00 $ 3200.00
(13) Install 8" new liner between Manhole # 7 to #11 1,231 LF $ 38.00 $ 46,778.00
(14) Install 8" new liner, sectional lining -point repair 92 LF $ 250.00 $ 23,000.00
Total Amount of this Change Order = $185,316.00
Final Change Order No. 1 cost will be based on the actual amount of work performed in the field.
Contract Amount (Base Bid)
... ..... ......... ......
$
110,290.30
Amount of This Change Order
.. .... ...... .. ..
$
185,316.00
Amount of Previous Change Orders
......................................
$
0.00
Total Change Orders
...... . ......... ...... ......
$
185,316.00
Modified Contract Amount
..... ... .
$
295,606.30
By reason of this change order the time of None
completion will be adjusted as follows:
Approved: Date:
Director of Community Services & Water
Attest: Date:
Willard Yamaguchi, City Clerk
We, the undersigned Contractor, have given careful consideration to The change proposed and hereby agree; if this proposal is approved, that we will provide all
labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and
will accept as full payment therefore the prices shown above:
Accepted Date: Contractor:
By: Title:
c: Project rile/Contractor/Purchasing Rev. 06/08
Observation
Report with Still Images
Main Assen 17°
- ProjmtIVryPTe; latsp�ctionDat#: Weather: apecotor,
District Blvd. mH 8 To.
c l of Vernon
Y
1 � 28.2008
1 1' I)m Ayfeswerlf�
District i vd Mii 7
2:29:53 PM -
up u"111}t Node=
vawastream mode;.
Mani U%ijlti;
District Blvd, MH 7
i iWicq Blvd MH 8
305Q
t:6riin}exits:
Pipe Size: 8 x 8
Pipe Type; VCR
Direction U - Upstream
Observations
r
Reversed
u, -
0.0 ... «�
START US Yes
n_ -
- - - -
1-5 1,0
PFBSV pip0- Yes4
4 f=.6
Fa I l acre
-Broken Soil
£iar }ML
Visible
lam+ gyrax'
Fa�a karts., c
iv T�c`
-_ - Observations with Still Images Thursday, December 04, 2008 k35 PM Page 4 rf 1�4
� -- -
ddfd`§:y:%\ :
Distance i ength
i
123 4 Crack Crack Y f
CITY OF VERNON
COMMUNITY SERVICES & WATER DEPARTMENT
`6 J
e':P-a6i,S-
CONTRACT CHANGE ORDER NO. 2 SUPPLEMENT NO. SHEET 1 OF I SHEETS
PROJECT: Vernon Avenue Storm Drain Trenchless Lining & Point Repair P.O. No. 011.0006642
TO: SAK Construction of CA, LP CONTRACTOR
REQUESTED BY: City of Vernon
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and
conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally
inchulerl in the cnntrnct_
The old and deteriorated 5' long 12" diameter concrete sewer pipe along Everett Court which is not part of the
original bid item is now also needed to be removed and replaced.
Bid Item No. Descriptio Quantily Unit Cost Total Cost
(1) Remove and dispose debris 8" & 12" pipe on Everett Ct 330 LF $ 2.70 $ 891.00
(20) Excavate 8' deep 5' long & point repair 12" on Everett Ct 1 LS $ 4,579.30 $ 4,579.30
Total Amount of this Change Order = $ 5,470.30
Final Change Order No. 2 cost will be based on the actual amount of work performed in the field.
Contract Amount (Base Bid)
.... ..... .... .........
...... ......... .........
$
110,290.30
Amount of This Change Order
...... .. .......
...... ........ ............ ....
$
5,470.30
Amount of Previous Change Orders
..... .... ......
...... ........ ............
$
185,316.00
Total Change Orders
....... ....... ....... .
......... ....... ...... ..........
$
190,786.30
Modified Contract Amount
...... ....... .......
...... ...... .......... ...
$
301,076.60
By reason of this change order the time of 120 working days
completion will be adjusted as follows:
`
Approved: Date:
ee unity Servi s & Water
Date:
Attest: f
ar Yama c i, City Clerk
We, the undersigned Contractor, have givesideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
n c 1 con
labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and
will accept as full payment therefore the prices shown above.
Accepted Date: a ,- � a011 Contractor: 5�,� �IJY/�� .p �j�yl c� C19 LP
94e�ei�-
By: Title:
c: YrojecXYrle/U6fitractor/Purchasing xev. voiva
Z�1/-off RECEIVED
RECEIVED SEP 13 2011
SEP 14 2011 9 CITY ADMINISTRATION
CITY CLERK'S OFFICE STAFF REPORT
.. ............... ..
COMMUNITY SERVICES & WATER DEPARTM
6
DATE: September 13,2011
TO: Honorable Mayor and City Council
FROM: Samuel Kevin Wilson-; Director of Community Services & Water
RE: Contract No. CS-0015: Vernon Avenue Storm Drain Trenchless Manhole -To -
Manhole Pipe Lining & Sectional Linings (Point Repairs) — Change Order No. 3
The City has awarded Contract No. CS-0015 to SAK Construction of CA, LP (SAK) for the
lining and point repair of certain sections of the Vernon Avenue storm drain. The bid was far below
the Engineer's estimate. Because of the low cost the City approved a change order to repair the
District Boulevard sewer east of Heliotrope Avenue. City staff is now recommending that additional
work be performed to complete the repairs to the City sewer system Citywide.
When the City's sewer system was videotaped for inspection and evaluation in March 2005
(over 6 years ago), City staff identified various deteriorated sections of pipe within the City's street
system. Staff is recommending all deteriorated sections of the sewer system with the exception of a
section of sewer on Everett Court be repaired as part of Contract CS-0015. SAK was requested to
provide the City with unit prices to line or repair the remaining deteriorated sections of sewer system.
SAK responded with a total cost of $50,973.37 which will include the removal and replacement of a
broken and beyond repair 5' long section of 8" sewer pipe located at 25s' Street west of Santa Fe
Avenue, 27 spot repairs and the lining of approximately 140 feet of 8" sewer pipe.
The City recently had SAK Construction expose the 12" sewer line on Everett Court to
determine if the sewer could be lined. It was determined that the concrete sewer pipe was in such
poor condition that it could not be repaired. The City has requested SAK to provide a cost proposal to
replace 190' of the sewer pipe on Everett Court. Staff will evaluate the proposal once it's received to.
determine if SAK should be awarded this work through an additional change order.
Given the extremely poor condition of the pipe segments and cost savings, I recommend that
Change Order No. 3 be approved and authorize SAK to perform all repairs to the sewer system with
the exception of Everett Court and that funds from Account No. 011.100150 be utilized to construct
this improvement during this financially challenging time. This fund has approximately $2.5 million
that can only be utilized for street improvement purposes.
RECEIVED
SEP 1 4 2011
CITY CLERT8 UNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: Mark Whitworth, City Administrator
FROM: Samuel Kevin Wilson Director of Community Services & Water
DATE: September 13, 2011
SUBJECT: Contract No. CS-0015: Vernon Avenue Storm Drain Trenchless Manhole -To -
Manhole Pipe Lining & Sectional Linings (Point Repairs) — Change Order No. 3
The City has awarded Contract No. CS-0015 to SAK Construction of CA, LP (SAK) for the
lining and point repair of certain sections of the Vernon Avenue storm drain. The bid was far below
the Engineer's estimate. Because of the low cost the City approved a change order to repair the
District Boulevard sewer east of Heliotrope Avenue. City staff is now recommending that additional
work be performed to complete the repairs to the City sewer system Citywide.
When the City's sewer system was videotaped for inspection and evaluation in March 2005
(over 6 years ago), City staff identified various deteriorated sections of pipe within the City's street
system. Staff is recommending all deteriorated sections of the sewer system with the exception of a
section of sewer on Everett Court be repaired as part of Contract CS-0015. SAK was requested to
provide the City with unit prices to line or repair the remaining deteriorated sections of sewer system:
SAK responded with a total cost of $50,973.37 which will include the removal and replacement of a
broken and beyond repair 5' long section of 8" sewer pipe located at 25`h Street west of Santa Fe
Avenue, 27 spot repairs and the lining of approximately 140 feet of 8" sewer pipe.
The City recently had SAK Construction expose the 12" sewer line on Everett Court to
determine if the sewer could be lined. It was determined that the concrete sewer pipe was in such poor
condition that it could not be repaired. The City has requested SAK to provide a cost proposal to
replace 190' of the sewer pipe on Everett Court. Staff will evaluate the proposal once it's received to
determine if SAK should be awarded this work through an additional change order.
Given the extremely poor condition of the pipe segments and cost savings, I recommend that
Change Order No. 3 be approved and authorize SAK to perform all repairs to the sewer system with
the exception of Everett Court and that funds from Account No. 0 11. 100 150 be utilized to construct
this improvement during this financially challenging time. This fund has approximately $2.5 million
that can only be utilized for street improvement purposes.
SKW/pc
Enclosures
CITY OF VERNON
COMMUNITY SERVICES & WATER DEPARTMENT
CONTRACT CHANGE ORDER NO. 3 SUPPLEMENT NO. SHEET 1 OF 1 SHEETS
PROJECT: Vernon Avenue Storm Drain Trenchless Lining & Point Repair P.O. No. 011.0006642
TO: SAK Construction of CA, LP CONTRACTOR
REQUESTED BY: City of Vernon
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and
conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally
included in the contract.
The old and deteriorated 8" diameter sewer pipe along Everett Court which is not part of the original bid item
is now also needed to be realigned.
Bid Item No. Descriptio Quantit Unit Cost
Total Cost
(16) Install 8" liner at Everett Ct-Manhole #6413 to #64C 140 LF $ 38.00
$ 5,320.00
(17) Cut off protruding (break in) lateral pipe 6 LF $ 500.00
$ 3,000.00
(18) Cut open and reconnect lateral entrances 27 EA $ 250.00
$ 6,750.00
(19) Install point repair 8" at various streets 108 LF $ 250.00
$ 27,000.00
(21) Excavate 13' deep 5' long & point repair on 25th St 1 LS $ 5,996.37
$ 5,996.37
(22) CCTV Video on newly installed liners 1,938 LF $ 1.50
$ 2,907.00
Total Amount of this Change Order =
$ 50,973.37
Final Change Order No. 3 cost will be based on the actual amount of work performed in the field.
Contract Amount (Base Bid)
I ...............................................
$
110,290.30
Amount of This Change Order
I .............................................
$
50,973.37
Amount of Previous Change Orders
I .........................................
$
190,786.30
Total Change Orders
I .....................................................
$
241,759.67
Modified Contract Amount
.............................................
$
352,049.97
By reason of this change order the time of 30 working days
completion will be adjusted as follows: g
Approved: Date:
Director of Community Services & Water
Attest: Date:
Willard Yamaguchi, City Clerk
We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and
will accept as full payment therefore the prices shown above.
Accepted Date: Contractor:
By: Title:
c: rrolect ruereontractovrumnasing Rev. 06/08
lee'�l ';7 O S
CITY OF VERNON
COMMUNITY SERVICES & WATER DEPARTMENT
CONTRACT CHANGE ORDER NO. 4 SUPPLEMENT NO. SHEET 1 OF 1 SHEETS
PROJECT: Vernon Avenue Storm Drain Trenchless Lining & Point Repair P.O. No. 011.0006642
TO: SAK Construction of CA, LP CONTRACTOR
REQUESTED BY: City of Vernon
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and
conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally
included in the cnntmet
Replace 183 linear feet of deteriorated, broken and beyond repair existing 12" diameter concrete sewer
pipe, on Everett Court in Central Manufacturing District (CMD) with a new 8" diameter vitrified clay pipe
(VCP). The construction shall also include the replacement of an existing manhole with a new deeper drop
sewer manhole with T-Lock inside liner.
In addition at street station 21+50 on 25th Street, a new terminal sewer manhole shall be constructed to
serve as an upper most point of the sewer line.
Total Amount of Change Order No. 4 = S 60,656.20 (see detailed costs on attached sheet)
Final Change Order No. 4 cost will be based on the actual amount of work performed in the field..
Contract Amount Base Bid
....
$
110,290.30
Amount of This Change Order
I .............................................
$
60,656.20
Amount of Previous Change OrdersI .........................................
$
241,759.67
Total Change Orders
I .....................................................
$
' 302,415.87
Modified Contract Amount .............................................
$
412,706.17
By reason of this change order the time of 3 0 working days
completion will be ad 'usted as Follows; -
/ c
Approved: t Date:
a ran unity Services & Water
/Dire
// p
Attest: Date:
it rd Y aguchi, City Clerk
We, the undersigned Contractor, have giv eful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and
will accept as full payment therefore the prices shown above.
I
Accepted Date: / - % Contractor: r,4k &c IC7 ✓6y tidy;
� Title:
By: 411-
c: rroteor- munnmecmvrurcnasmg Rev. 06/08
10/192011
SAK Construction CA LP - Proposed Change Order No. 4
Contract No. CS-0015
Vernon Avenue Strom Drain Trenchless Linings
Everett Court from 49th Street toward North direction
8" Sewer Line Replacement (183 linear feet) from new Drop MH to existing 49th Street MH
NO
s r DESCRIPTIONi y
UNIT
QUANTITY-
UNIT PRICE
COST ''
1
Remove 48"dia. existing sewer manhole(5 feet deep)
EA
1
$ 1,148.00
$ 1,148.00
2
Construct new drop sewer MH per APWA Std. 202-2 with T-Lock inside liner
EA
1
$ 7,968.00
$ 7.968.00
3
Construct trench shoring
LS
1
$ 1,210.00
$ 1,210.00
4
Sawcut & construct 8" VCP sewer with 12 sack slurry trench backfill
LF
183
$ 147.00
$ 26,901.00
5
Install 6" Full Body Wye with 4 feet lateral to reconnect existing lateral
LS
1
$ 550.00
$ 550.00
6
Fill the abandoned 12" the. sewer with 1/2 sack of sand slurry
If
183
$ 20.00
$ 3,660.00
7
Break into existing manhole & connect new 8" VCP pipe
LS
1
$ 1,540.00
$ 1,540.00
8
Bulk cap 12" dia. hole with brick & mortar in existing manhole _
LS
1
$ 550.00
$ 550.00
9
Reconnect 8" VCP sewer with new sewer drop manhole
LS
I
$ 1,210.00
$ 1,210.00
10
Construct 8" thick asphalt concrete (trench) on 49th Street (C2 PG-70-10)
SF
63
$ 41.20
$ 2,595.60
11
Construct 8" thick concrete slab/drive approach (trench) on Everett Court
SF
486
$ 12.60
$ 6,123.60
SUB -TOTAL =
$53,456.20
Added proposal for a new terminal sewer manhole on 251h Street
12
Construct new sewer MH per APWA Std. 200-3 with T-Lock inside liner
EA
1 -
$ 7,200.00
$ 7,200.00
TOTAL =
$60,656.20
a
i�G� 070%/-Gj
GL ////�//
DECEIVED
OCT 2 5 2011
RECEIVE® CITY ADMINISTRATION
OCT 2 5 2011
CITY CLERK'S OFFICE STAFF REPORT
COMMUNITY SERVICES & WATER DEPART T
DATE: October 24, 2011
TO: Honorable Mayor and City Council
FROM: Samuel Kevin Wilson, Director of Community Services & Water
RE: Contract No. CS-0015: Vernon Avenue Storm Drain Trenchless Manhole -To -
Manhole Pipe Lining & Sectional Linings (Point Repairs) - Change Order No. 4
The City has awarded Contract No. CS-0015 to SAK Construction of CA, LP (SAK) for the
lining and point repair of certain sections of the Vernon Avenue storm drain.
The City recently had SAK expose the 12" sewer line on Everett Court to determine if the
sewer could be lined. It was determined that the concrete sewer pipe was in such poor condition that
it could not be repaired. The City has requested SAK and other sewer contractors to provide a cost
proposal to replace 183 linear feet of the existing sewer pipe and a drop manhole on Everett Court.
Staff has received the following proposals and SAK is the lowest responsible bidder.
(1) SAK Construction of CA LP $ 53,456.20
(2) Valverde Construction, Inc. $ 72,280.00
(3) Miramontes Construction, Inc. $ 73,815.00
(4) Vasilj Inc. $ 76,715.00
After excavation for the deteriorated and broken 8" sewer pipe repair on 25s' Street per
Change Order No. 3, SAK discovered that the sewer pipe was encased by concrete and could not be
reached for repair and suggested to construct a new terminal sewer manhole to serve as an upper
most point of the sewer line. SAK was requested to provide the City with a unit price of new sewer
manhole and SAK responded with a cost of $7,200.00 which is a reasonable cost for that depth and
location. Therefore staff is recommending the proposed Change Order No.4 be issued for total of
$60,656.20 to include the new sewer manhole.
Given the extremely poor condition of the pipe segments, I recommend that Change Order
No. 4 be approved and authorize SAK to perform replacement of the deteriorated, broken and beyond
repair sewer system on Everett Court north of 49°i Street and construct a new terminal sewer
manhole on 25s' Street. It is further recommended that funds from Account No. 011. 100 150 be
utilized to construct these improvements. This fund has approximately $2.5 million that can only be
utilized for street improvement purposes.
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: Mark Whitworth, City Administrator
FROM: Samuel Kevin Wilson, of Community Services & Water
DATE: October 24, 2011
SUBJECT: Contract No. CS-0015: Vernon Avenue Storm Drain Trenchless Manhole -To -
Manhole Pipe Lining & Sectional Linings (Point Repairs) — Change Order No. 4
The City has awarded Contract No. CS-0015 to SAK Construction of CA, LP (SAK) for the
lining and point repair of certain sections of the Vernon Avenue storm drain.
The City recently had SAK expose the 12 sewer line on Everett Court to determine if the
sewer could be lined. It was determined that the concrete sewer pipe was in such poor condition that it
could not be repaired. The City has requested SAK and other sewer contractors to provide a cost
proposal to replace 183 linear feet of the existing sewer pipe and a drop manhole on Everett Court.
Staff has received the following proposals and SAK is the lowest responsible bidder.
(1) SAK Construction of CA LP $ 53,456.20
(2) Valverde Construction, Inc. $ 72,280.00
(3) Miramontes Construction, Inc. $ 73,815.00
(4) Vasilj Inc. $ 76,715.00
After excavation for the deteriorated and broken 8" sewer pipe repair on 25`h Street per
Change Order No. 3, SAK discovered that the sewer pipe was encased by concrete and could not be
reached for repair and suggested to construct a new terminal sewer manhole to serve as an upper most
point of the sewer line. SAK was requested to provide the City with a unit price of new sewer
manhole and SAK responded with a cost of $7,200.00 which is a reasonable cost for that depth and
location. Therefore staff is recommending the proposed Change Order No.4 be issued for total of
$60,656.20 to include the new sewer manhole.
Given the extremely poor condition of the pipe segments, I recommend that Change Order
No. 4 be approved and authorize SAK to perform replacement of the deteriorated, broken and beyond
repair sewer system on Everett Court north of 49`h Street and construct a new terminal sewer manhole
on 25`h Street. It is further recommended that funds from Account No. 011.100150 be utilized to
construct these improvements. This fund has approximately $2.5 million that can only be utilized for
street improvement purposes.
SKW/pc
Enclosures
CITY OF VERNON
COMMUNITY SERVICES & WATER DEPARTMENT
CONTRACT CHANGE ORDER NO. 4 SUPPLEMENT NO. _ SHEET 1 OF 1 SHEETS
PROJECT: Vernon Avenue Storm Drain Trenchless Lining & Point Repair P.O. No. 011.0006642
TO: SAK Construction of CA, LP CONTRACTOR
REQUESTED BY:
of Vernon
You are hereby directed to make the herein described changes to the plans and specifications or do the following described work
not previously included in the plans and specifications of this contract. Except as specifically modified herein, all terms and
conditions of the original contract remain in full force and effect, and apply to the additional work as if said work was originally
included in the contract.
Replace 183 linear feet of deteriorated, broken and beyond repair existing 12" diameter concrete sewer
pipe, on Everett Court in Central Manufacturing District (CMD) with a new 8" diameter vitrified clay pipe
(VCP). The construction shall also include the replacement of an existing manhole with a new deeper drop
sewer manhole with T-Lock inside liner.
In addition at street station 21+50 on 25th Street, a new terminal sewer manhole shall be constructed to
serve as an upper most point of the sewer line.
Total Amount of Change Order No. 4 = $ 60,656.20 (see detailed costs on attached sheet)
Final Change Order No. 4 cost will be based on the actual amount of work performed in the field.
Contract Amount Base Bid
...............................................
$
110,290.30
Amount of This Change Order
I .............................................
$
60,656.20
Amount of Previous Change Orders
I .........................................
$
241,759.67
Total Change Orders
I .....................................................
$
302,415.87
Modified Contract Amount
.............................................
$
412,706.17
By reason of this change order the time of 30 working days
g
completion will be adjusted as follows:
Approved: Date:
Director of Community Services & Water
Attest: Date:
Willard Yamaguchi, City Clerk
We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all
labor, equipment and materials, including overhead, except as may otherwise be noted above, and perform all services necessary for the work above specified, and
will accept as full payment therefore the prices shown above.
Accepted Date: Contractor:
By: Title:
c: Project File/Contractor/Purchasing Rev. 06/08
10/19/2011
SAK Construction CA LP - Proposed Change Order No. 4
Contract No. CS-0015
Vernon Avenue Strom Drain Trenchless Linings
Everett Court from 49th Street toward North direction
8" Sewer Line Replacement (183 linear feet) from new Drop MR to existing 49th Street MH
1
Remove 48" dia. existing sewer manhole (5 feel deep)
EA
I
$ 1,148.00
$ 1,148.00
2
Construct new drop sewer MH per APWA Std. 202-2 with T-Lock inside liner
EA
1
$ 7,968.00
$ 7,968.00
3
Construct trench shoring
LS
1
$ 1,210.00
$ 1,210.00
4
Sawcut & construct 8" VCP sewer with 1/2 sack slurry trench backIIll
LF
183
$ 147.00
$ 26,901.00
5
Install 6" Full Body Wye with 4 feet lateral to reconnect existing lateral
LS
I
$ 550.00
$ 550.00
6
Fill the abandoned 12" dia. sewer with 1/2 sack of sand sluny
If
183
$ 20.00
$ 3,660.00
7
Break into existing manhole & connect new 8" VCP pipe
LS
I
$ 1,540.00
$ 1,540.00
8
Bulk cap 12" dia. hole with brick & mortar in existing manhole
LS
I
$ 550.00
$ 550.00
9
Reconnect 8" VCP sewer with new sewer drop manhole
LS
1
$ 1,210.00
$ 1,210.00
10
Construct 8" thick asphalt concrete (trench) on 49th S[rect (C2 PG-70-10)
SF
63
$ 41.20
$ 2,595.60
11
Construct 8" thick concrete slab/drive approach (trench) on Everett Court
SF
486
$ 12.60
$ 6,123.60
SUB -TOTAL =
$53,456.20
Added proposal for a new terminal sewer manhole on 25th Street
12
Construct new sewer MH per APWA Sod. 200-3 with T-Lock inside liner
EA
1
$ 7,200.00
$ 7,200.00
TOTAL =
$60,656.20
RESOLUTION NO. 2012-102
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON ACCEPTING THE WORK OF SAK CONSTRUCTION, LLC
IN ACCORDANCE WITH CONTRACT NO. CS-0015 OF THE CITY
OF VERNON
WHEREAS, SAK Construction, LLC was awarded Contract No.
CS-0015 for the construction of the Vernon Avenue storm drain
trenchless manhole -to -manhole pipe linings and sectional linings
project pursuant to Resolution No. 2011-05 of the City of Vernon; and
WHEREAS, the Director of Community Services and Water has
reported to the City Council of the City of Vernon that said work has
been completed and recommends that the work be accepted and payment be
made to the Contractor in accordance with the agreement.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The work of SAK Construction, LLC pursuant to
Contract No. CS-0015 is hereby approved and accepted.by the City
Council of the City of Vernon.
SECTION 3: The original contract amount was One Hundred Ten
Thousand Two Hundred Ninety Dollars and Thirty Cents ($110,290.30).
Four change orders were issued for a total final contract amount of
Three Hundred Ninety -Six Thousand One Hundred Twenty Dollars and
Forty -One Cents ($396,120.41). The ten percent retention (10%) or the
sum of Thirty -Nine Thousand Six Hundred Twelve Dollars and Four Cents
($39,612.04) is payable thirty-five (35) days after the recordation of
the Notice of Completion, except such amounts as are required by law
to be withheld by properly executed and filed notices to stop payment,
or as may authorized by the contract to be further retained.
SECTION 4: The City Council of the City of Vernon hereby
directs payment of said sums as set forth to SAK Construction, LLC and
instructs the City Clerk to file a Notice of Completion with the
County Recorder.
SECTION 5: The City Clerk of the City of Vernon shall
certify to the passage, approval and adoption of this resolution, and
the City Clerk of the City of Vernon shall cause this resolution and
the City Clerk's certification to be entered in the File of
Resolutions of the Council of this City.
APPROVED AND ADOPTED this 19th day of June, 2012.
Name: William J. Davis
Title: H , J/ Mayor Pro-Tem
2
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
I, Willard G. Yamaguchi, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution
No. 2012-102, was.duly passed, approved and adopted by the City
Council of the City of Vernon at a regular meeting of the City Council
duly held on Tuesday, June 19, 2012, and thereafter was duly signed by
the Mayor or Mayor Pro-Tem of the City of Vernon.
Executed this )-� day of June, 2012, at Vernon, California.
(SEAL)
3
4305 Santa Fe Avenue, Vernon, California 90058
Telephone (323) 583-8811
June 21, 2012
County of Los Angeles
Registrar -Recorder
Document Analysis and Recording
P.O. Box 53115
Los Angeles, CA 90053-0115
Re: Completion of Contract No. CS-0015
Dear Sir of Madam:
Transmitted herewith is a Notice of Completion to be recorded by your office.
Please return the Recorded Notice to the attention of the undersigned.
Very tr& yours,
/ � A
LLIKRD G. Y.
City Clerk
WGY:dj
Enclosure
c: Pin Chan
S. Kevin Wilson
Contract No. CS-0015
Resolution No. 2011-05, 2012-102
E,-�cfusi=5 Industrial
By:
WHEN RECORDED MAIL TO
r T
Name WILLARD YAMAGUCHI
Street 4305 SANTA FE AVENUE
Address
City VERNON
State CA
Zip 90058
L J
Space above this line for recorders use
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. (See reverse side for complete requirements.) -
Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described.
2. The full name of the owner is CITY OF VERNON
3. The fug address of the owner is 4305 SANTA FE AVENUE, VERNON, CA 90058
4. The nature of the interest or estate of the owner is: In fee.
A MUNICIPAL CORPORATION
(If other than Fee. stdke'In fee' and insert, for ammple.'purchaser under contract of Purchase; or'Lessee)
S. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are:
NAMES ADDRESSES
6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the
commencement of the work or improvements herein referred to:
NAMES ADDRESSES
7. A work of improvement on the property hereinafter described was completed on 06/ 19/ 2012 -. The work done was:
6. The names of the contractor, if any, for such work of improvement was SAK CONSTRUCTION OF CA, LP
103 N. COOL SPRINGS RD., O'FALLON, MO 63366
(It no contractor for work of inwro mir ant as a whole, Insert 'None) (Date of Contract)
9. The property on which said work of improvement was completed is in the City of VERNON
County of LOS ANGELES ,Stateof CA and is described as follows: CONTRACT NO. CS-0015 VERNON AVENUE
STORM DRAIN TRENCHLESS MANHOLE -TO -MANHOLE PIPE LININGS & SECTIONAL LININGS POINT RE
10. The st/rg/Q� add/ra ss said property is NUINt
/ (If no street address has been officially assigned, insen'rans'.)
L^I
(Signature of Owner or corporate officer of Owner named in paragraph 2. or his agent)
VERIFICATION
I, the undersigned, say: I am the CITY CLERK , the Declarant of the foregoing Notice of Completion;
(President of, Manager at, Partner of, Owner of, etc.) -
I have read said Notice of Completion and know the contents thereof; the same is true to my own knowledge. I declare under penalty of
perjury that the foregoing is true and correct. -
Executedon JUNE ,iZ-� ,2o� VERNX /% eo� CA
aINltanta of the Notice of Completion are true)
I R!
Before you use this forth fill in all blanks, and make whatever changes are appropriate and necessary IIIIIIIIIII �IIIIIIIIIIIII
to your particular transaction. Consult a lawyer if you doubt the forth s fitness or your purpose and use. N
Wolcotts makes no representation or warranty, express or implied, with respect to the merchantability T 67775 01114 2
or fitness of this form for an intended use or purpose. 02005 WOLCOTTS FORMS, INC.
FORM 1114 Rev. 10-05
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California / 1
County of L
On "� �� before me,. f7/�CL A-111174 A1111414i Ndl7� y PIA110
Date /Here Insert Name and Title of the Officer
personally appeared y/I/�C�� C-7 &IM1 11el2/
ANA KARINA RUEDA
Commission ♦ 1900284
Notary Public • California_
Los Angeles County
My .Comm. Expires Aug19, 2014+
who proved to me on the basis of satisfactory
evidence to be the person) whose nameA is/0
subscribed to the within instrument and acknowledged
to me that he/s,A/toy executed the same in
his/h¢f/tf l§ir authorized capacityp4s), and that by
his4r/t Ar signature) on the instrument the
person,€), or the entity upon behalf of which the
person(' acted, executed the instrument.
I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature Y
Place Notary Seal Above Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name: N//��l// [ 1 ��1//7iG/GLl
❑ Corporate Officer — Title(s)! i
Number of Pages:
Signer's Name:
❑ Corporate Officer —
❑ Individual ❑ Individual
❑ Partner — ❑ Limited ❑ General Top of thumb here ❑ Partner — ❑ Limited ❑ General Top of thumb here
❑ Attorney in Fact ❑ Attorney in Fact
❑ Trustee ❑ Trustee
❑ Guardian or Conservator ❑ Guardian or Conservator
V Other: ❑ Other:
Signer IIssJR resenting: Signer Is Representing:
0 2009 National Notary Association • NationalNotary.org • 1.800-US NOTARY (1-800-876-6827) Item #5907
RECEIVED
JUN 1-2 2012
CITY CLMK'S OFFICE
STAFF REPORT
RECEIVED
JUN 11 2012
CITY ADMINISTRATION
COMMUNITY SERVICES & WATER DEPARTMENT
DATE: June 11, 2012
TO: Honorable Mayor and.City Council
FROM: Samuel Kevin Wilson, Director of Community Services & Water
RE: CONTRACT No. CS-0015 — VERNON AVENUE STORM DRAIN
TRENCHLESS MANHOLE -TO -MANHOLE PIPE LININGS & SECTIONAL
LININGS (POINT REPAIRS)
The City of Vernon's contractor SAK Construction, LLC has completed construction of the
Vernon Avenue Storm Drain Trenchless Manhole -To- Manhole Pipe Linings & Sectional Linings
(Point Repairs) Project, City Contract No. CS-0015 and all work has been found to be acceptable.
Funds for the project has come from "EWB Street Improvements" Account No. 011.100150.
The SAK Construction, LLC's final total contract amount including Change Orders No. 1,2,
3 and 4 is $396,120.41 (Three Hundred Ninety Six Thousand One Hundred Twenty Dollars and forty
one cents). It is recommended that the ten percent (10%) retention of $39,612.04 (Thirty Nine
Thousand Six Hundred Twelve Dollars and four cents) be paid thirty-five (35) days after the
recordation of the Notice of Completion, except such amounts as are required by law to be withheld
by properly executed and filed notices to stop payment, or as may be authorized by the contract to be
further retained.
RECEIVEpF �fq
JUN 12 2012
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: Mark Whitworth, City Administrator
41J
FROM: Samuel Kevin Wilson, Director of Community Services & Water
DATE: June 11, 2012
SUBJECT: CONTRACT No. CS-0015 — VERNON AVENUE STORM DRAIN
TRENCHLESS MANHOLE -TO -MANHOLE PIPE LININGS & SECTIONAL
LININGS (POINT REPAIRS)
The Vernon Avenue Storm Drain Trenchless Manhole -To- Manhole Pipe Linings & Sectional
Linings (Point Repairs) Project, City Contract No. CS-0015 has completed and all work has been found
to be acceptable. The Department of Community Services and Water recommends that the work be
accepted by the City Council at its next City Council meeting.
SKW/pc
Enclosures
This page Is part of your document - DO NOT DISCARD -
20120965770
Recorded/Filed in Official Records
Recorder's Office, Los Angeles County,
California
06/29/12 AT 08:45AM
RECEIVED
JUL 18 2012
CITY CLERK'S OFFICE
FEES:
TAXES:
OTHER:
PAID:
�YE�191�I�ImINdII�AI�Y�191tl�IW
LEADSHEET
201206290900004
00006037941
I IIIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII IIII
004101046
SEQ:
01
DAR - Mailll (Hard Copy)
IIII IIIIIIIIIIIIIIIIIIIIIIIIIIII�Illlllll�llllIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIIII
IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIII IIIIIIIIIII
EMUS THIS FORM IS NOT TO BE DUPLICATED
P000es
0.00
0.00
0.00
0.00
RECORDING REQUESTED BY:
WHEN RECORDED MAIL TO:
r
Name WILLARD YAMAGUCHI
Street 4305 SANTA FE AVENUE
Address
City VERNON
State CA
Zip 90058
L
0612912012
i
*20120965770*
Space above this line for recorder's use
NOTICE OF COMPLETION
Notice pursuant to Civil Code Section 3093, must be filed within 10 days after completion. (See reverse side for complete requirements.) -
Notice is hereby given that:
1. The undersigned is owner or corporate officer of the owner of the interest or estate stated below in the property hereinafter described.
2. The full name of the owner is CITY OF VERNON
3. The full address of the owner is 4305 SANTA FE AVENUE, VERNON CA 90058
4. The nature of the interest or estate of the owner is: In fee.
A MUNICIPAL CORPORATION
(II other than Fee. stdke'In fee and insert. for example,'purchaser under contract of purchase,' or 'Lessee')
5. The full names and full addresses of all persons, if any, who hold title with the undersigned as joint tenants or as tenants in common are:
NAMES ADDRESSES
6. The full names and full addresses of the predecessors in interest of the undersigned, if the property was transferred subsequent to the
commencement of the work or improvements herein referred to:
NAMES ADDRESSES
7. , A work of improvement on the propertyhereinafterdescribed was completed on 06 / 19/ 2012 The work done was:
6.. The names of the contractor, if any, for such work of improvement was SAK CONSTRUCTION OF CA, LP
1r1Q hl runt CDDTkIrC nn ni rAI r nsr un 11n11
(II no contractor for work of improvement as a whde, insen'None) (Date of Contract)
9. The property on which said work of improvement was completed is in the City of VERNON
County of LOS ANGELES ,Stateof CA and is described as follows: CONTRACT NO. CS-0015 VERNON AVENUE
STORM DRAIN TRENCHLESS MANHOLE —TO —MANHOLE PIPE LININGS & SECTIONAL LININGS POINT REPAIR!
10. The str addr ss said propertyis _ NONE
�� n_ /^ (II no street address has been oNkielly assigned, insen'mne'.)
WI
(Signature of Owner or Corporate officer of Owner named In paragraph 2, or his aged)
VERIFICATION
I, the undersigned, say: I am the CITY CLERK , the Declarant of the foregoing Notice of Completion;
(Presided of, Manager of. Partner of, Owner of, etc.
I have read said Notice of Completion and know the contents thereof; the same is true to my own knowledge. I declare under penalty of
perjury that the foregoing is true and correct.
Executed on JUNE 20 t VERNONCA
floOffiarefIAT.natur. AI 1h. indiMd, n xnnn h, M m.
v
is form fill in all blanks, and make whatever changes are appropriate and necessary IIIIIIIYIII Illllllfglll
Irans0ion. Consult a lawyer if you doubt the forth s fitness for your purpose and use. u INN
to representation or warranty, express or implied, with respect to the merchantability 7 67775 01114 2
Irtn for an intended use or purpose. 02005 WOLCOTTS FORMS, INC.
FORM 1114 Rev. 10-05
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
State of California / l
County of ds /ilf/�S J/i/ �/j /
On &A�/a before me, T/{94 6J11174 161et 4j ND�%/
„ � Date , _ _ ^� /Hem Insert Name anti Title of the Officer
personally -appeared
ANA KARINA RUEDA
Commission # 1900284
Notary Public - California _ D,
Los Angeles County
My Comm. Expires Aug19.2014'
who proved to me on the basis of satisfactory
evidence to be the person(§) whose narri is/0
subscribed to the within instrument and acknowledged
to me that he/st/toy executed the same in
his/hpvtl}2ir authorized capaci*s), and that by
his/h/ rft iir signature$) on the instrument the
person`), or the entity upon behalf of which the
persono acted, executed the instrument.
I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
S��"/
Place Notary Seel Above SignaturSignature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons helying on the document
and could prevent fraudulent removal and reattachment of this form to another document.
Description of Attached Document
Title or Type of Document:
Document Date:
Signers) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Corporate Officer — Title(s):
❑ Individual
❑ Partner — ❑ Limited ❑ General Top of thumb here
❑ Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
Other:
Signer Is R presentin :
ez zoo
Number of Pages:
Signer's Name:
❑ Corporate Officer— Title(s):
❑ Individual
❑ Partner — ❑ Limited ❑ General Top of thumb here
❑ Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
02009 National Notary Assoclation • NationalNotary.org • 1.800-US NOTARY (1.800-8]8-682]) item ffbam