Resolution No. 2011-036RESOLUTION NO. 2011-36
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON ESTABLISHING AND ADOPTING ENCROACHMENT,
.LICENSE AND FRANCHISE FEES AND DEPOSIT SCHEDULES
PURSUANT TO CHAPTER 22, ARTICLE VI OF THE VERNON
CITY CODE AND REPEALING RESOLUTION NO. 5088
WHEREAS, Chapter 22, Article VI of the Vernon City Code
specifies that the City Council of the City of Vernon shall, from time
to time, establish an encroachment fee and deposit schedule, a license
fee schedule and a franchise fee schedule and shall set the amount of
certain bonds and establish liability insurance requirements; and
WHEREAS, on February 21, 1984, the City Council of the City
of Vernon adopted Resolution No. 5088 adopting encroachment, license
and franchise fees and deposit schedules pursuant to Chapter 22 of the
Vernon City Code; and
WHEREAS, on March 15, 2011, the City Council of the City of
Vernon adopted Ordinance No. 1175 providing for the establishment of a
three-year restriction on cuts to newly paved or resurfaced streets, a
two-year restriction on slurry sealed or chipped sealed streets, and
amending the Code regarding deposits or surety bonds and liability
insurance for encroachment permits and licenses; and
WHEREAS, the Director of Community Services & Water by memo
dated February 23, 2011, recommended that the fees for encroachments,
licenses and franchises be increased to reflect the increase in the
cost of service provided.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: Any and all work performed by governmental
agencies, utility companies and private contractors within street
right-of-way, including, without limitation, closing of traffic lanes,
detouring traffic or interfering with the normal parking pattern or
the pedestrian use of the sidewalk, shall only be conducted pursuant
to a permit issued by the City.
SECTION 3: The City Council of the City of Vernon hereby
establishes the encroachment, license, franchise and related fees as
set forth in the schedule attached hereto as Exhibit A and incorporated
herein by reference. The fees set forth in Exhibit A shall be paid
before the issuance of any permit, or the approval of any franchise or
license.
SECTION 4: The following exemptions to Section 3 shall
apply:
A. utility companies and other governmental agencies shall
not be required to make prior payment of issuance fees or make security
deposits where an express provision of a franchise agreement with the
City provides a different arrangement.
B. The City of Vernon Water Department, Light & Power
Department, Fiber Optic Division, and Gas Department shall not be
required to pay inspection, street damage restoration, and permit fees
inasmuch as the costs for permit services are accounted for internally
for the City departments.
C. No fees shall be charged to governmental agencies with
reciprocal agreements.
SECTION 5: Effective April 15, 2011, the applicant for any
franchise, license, or encroachment permit shall provide general
2
commercial liability insurance in an amount determined by the Risk
Manager and approved by the City Attorney of the City of Vernon prior
to the issuance of each franchise, license or encroachment permit.
SECTION 6: The City's Risk Manager shall require, in
connection with any policy or policies of insurance required by
Chapter 22, Article 6, that the insurance policy or policies name the
City of Vernon as an additional insured, and shall further provide that
said policy or policies may not be cancelled without giving the City of
Vernon at least ten (10) days written notice of the insurer's intention
to so cancel said policy or policies.
SECTION 7: Prior to the issuance of an encroachment permit
a faithful performance bond payable to the City of Vernon shall be
provided to the City in an amount as set forth in the schedule attached
hereto as Exhibit B and incorporated herein by reference.
SECTION 8: In addition to the above, the franchisee or
licensee shall pay all fees and deposits necessary to obtain the
required encroachment permits.
SECTION 9: The issuance fee and annual renewal fee for
franchises and licenses shall be revised as follows:
A. The issuance fee and annual renewal fee provided for
herein shall be adjusted annually to account for -inflation based on the
Engineering News Record (ENR) Construction Cost Index. Beginning
July 1, 2011 and every July 1 thereafter, the issuance fee and annual
renewal fee will automatically increase by an amount calculated using
the following formula - multiply the most recent issuance fee and
annual renewal fee in effect by the percentage increase over the
previous 12 months immediately preceding the most recent publication of
the ENR Construction Cost Index existing on July 1 of the year of the
-3_
increase. There shall be no reduction in fees by operation of this
provision.
B. In the event the ENR Construction Cost Index is
discontinued such other Index or computation shall be used in order to
obtain substantially the same result that would be obtained if the ENR
Construction Cost Index had not been discontinued
SECTION 10: The fees provided for herein shall be
effective April 15, 2011, and all resolutions, or parts of
resolutions, not consistent with or in conflict with this Resolution,
including specifically Resolution No. 5088, are hereby superseded by
this Resolution.
SECTION 11: The City Clerk of the City of Vernon shall
certify to the passage, approval and adoption of this resolution, and
the City Clerk of the City of Vernon shall cause this resolution and
her certification to be entered in the File of Resolutions of the
Council of this City.
APPROVED AND ADOPTED this 15th day of March, 2011.
ATT T:
Willard G. a tgIchiUCity Clerk
Name:
Hilar_ i.o Gonzales
Title: Mayor /
4
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
I, Willard G. Yamaguchi, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution
No. 2011-36, was duly passed, approved and adopted by the City Council
of the City of Vernon at a regular meeting of the City Council duly
held on Tuesday, March 15, 2011, and thereafter was duly signed by the
Mayor or Mayor Pro-Te/m of the City of Vernon.
Executed this day of March, 2011, at Vernon, California.
Willar G. t�luclo City Clerk
(SEAL)
_5-
EXHIBIT A
EXHIBIT A
ENCROACHMENT, LICENSE & FRANCHISE
FEES
FEE
PERMIT ISSUANCE FEE
$75.00
PERMIT INSPECTION AND
PLAN CHECK FEES
RATE
REGULAR TIME 7:00 A.M.-5:30 P.M.
$84.50/HR.
OVERTIME-FRIDAY, SATURDAY,
SUNDAY, HOLIDAYS AND NIGHTS (4
HRS. MINIMUM)
$84.50/HR.
ANNUAL PERMIT FEE FOR ROUTINE
MAINTENANCE NO STREET CUTS
$500.00
RECONSTRUCTION FEES FOR
RATE
MINIMUM
WORK COMPLETED BY CITY
ASPHALT PAVEMENT
$11.75/SQ. FT.
$1,500.00
CONCRETE PAVEMENT
AND DRIVEWAY
$13.25/SQ. FT.
$1,500.00
CONCRETE SIDEWALK
$6.75/SQ. FT.
$1,000.00
CONCRETE CURB &
GUTTER
$35.00/LIN. FT.
$1,500.00
ASPHALT, CONCRETE &
SOIL REMOVAL
$9.00/SQ. FT.
$1,000.00
TREE REMOVAL
$725.00 EACH
$ 725.00
TREE PLANTING
$800.00 EACH
$ 800.00
LIGHTS, BARRICADES, OR
WARNING DEVICES
$100.00/SERVICE CALL
PLUS $2.50/BARRICADE/DAY
$100.00 plus $2.50/
BARRICADE/DAY
FURNISHED AND/OR
MAINTAINED
MONUMENT REPLACEMENT
$2,000.00/monument
$2,000.00
ALL OTHER DIRECT COSTS
TO THE CITY RESULTING
FROM THE PERMITEE'S
ACTIVITY, CALCULATED AT
ACTUAL COST PLUS
_6_
ADMINISTRATIVE COSTS
15%
FRANCHISES AND LICENSES
(ISSUANCE & ANNUAL
ISSUANCE
ANNUAL
RENEWAL)
RAILROAD CROSSINGS,
CONVEYOR BRIDGES, AND
TUNNELS ACROSS A
STREET
$25,000.00
$2,500.00
RAILROAD TRACKS,
$25,000.00 FOR EACH ONE-HALF (1/2)
$2,500.00 FOR
PIPELINES OR CONDUITS
MILE OR PORTION THEREOF
EACH ONE-HALF
ALONG A STREET
(1/2) MILE OR
PORTION
THEREOF
FOR PIPELINES OR
CONDUITS ACROSS A
STREET OR A METERING
MANHOLE IN THE STREET
$12,500.00
$1,250.00
FOR BUILDING FOOTINGS
AND APPENDAGES,
TRAFFIC SENSORS, SIGNS
AND ARCHITECTURAL
PROJECTIONS
$5,000.00
$500.00
7
l
EXHIBIT B
WA *AO
ENCROACHMENT PERMIT FAITHFUL PERFORMANCE BOND OR
CASH DEPOSIT REQUIREMENTS
The amount of an encroachment permit performance bond or cash deposit shall be determined
by multiplying the quantity of asphalt paving, concrete paving, sidewalk, concrete curb,
monuments and trench excavations proposed to be removed, disturbed or opened by the rate
shown in the table below, the sum of the totals shall establish the minimum amount of the bond
or deposit, except that in no case shall the faithful performance bond or cash deposit be less
than $5,000.
TYPE OF WORK TO BE
PERFORMED
RATE
ASPHALT PAVEMENT
$17.75/SQ. FT.
CONCRETE PAVEMENT
AND DRIVEWAY
$19.75/SQ. FT.
CONCRETE SIDEWALK
$10.25/SQ. FT.
CONCRETE CURB &
GUTTER
$52.50/1-IN. FT.
TRENCH EXCAVATIONS
$7,500.00/EACH OPEN EXCAVATION
MONUMENT
REPLACEMENT
$3,000.00/MONUMENT
- 8 -
CITY CLERK'S OFFICE
INTEROFFICE MEMORANDUM
DATE: March 16, 2011
TO: Ana Barcia, Deputy City Clerk
Rory Burnett, Finance Director/City Treasurer
Carlos Fandino, Director of Light & Power
Martha Valenzuela, Director of Business Services & Personnel
S. Kevin Wilson, Director of Community Services & Water
FROM: Willard Yamaguchi, City Clerk �/l
RE: Resolution No. 2011-36 — A Resolution of the City Council of the City of Vernon
Establishing and Adopting Encroachment, License and Franchise Fees and Deposit
Schedules Pursuant to Chapter 22, Article VI of the Vernon City Code and Repealing
Resolution No, 5088
Transmitted herewith is a copy of Resolution No. 2011-36 referenced above, which was approved by City
Council on March 15, 2011.
Thank you.
WY:dj
Attachment
c: Resolution Nos. 2011-36, 5088
j
RECEIVED
FEB 2 4 2011
CITY ADMINISTRATION
STAFF REPORT
COMMUNITY SERVICES & WATER DEPART
DATE: February 23, 2011
TO: Honorable Mayor and City Council
FROM: Samuel Kevin Wilson, Director of Community Services & Water
RE: Encroachment Fee Resolution
City of Vernon staff recently met with Southern California Gas Company officials to discuss the City
of Vernon's proposed'Encroachment fee resolution. The City had proposed to establish a new permit issuance
fee of $330.00 for an encroachment permit. The City had calculated this fee based on the number of man hours
an average permit application took to process, including administrative processing, reviewing and approving the
insurance provided, plan checking the drawings submitted, reviewing traffic control plans and performing
necessary research in order to determine that any excavations did not interfere with existing utilities. The Gas
Company questioned why the permit fee that was originally proposed was changed from $75.00 to $330.00.
They did not question the amount, but how it was derived. City staff advised the Gas Company that the permit
fee originally proposed only included the administrative cost, but the fee now included all plan checking
services which had not previously been accounted for.
After further consideration City Staff is recommending that the permit issuance fee only reflect the
administrative cost to the City. Encroachment permit projects can vary in complexity from projects requiring
street closures with complex traffic detouring, pipelining projects that can stretch for miles, to a simple pothole
in a parking lane requiring no traffic detouring. Therefore it is not possible to have one average plan check fee
that can covered the variety of projects the City will be permitting. Staff is now recommending that a separate
plan check fee be charged based on the number of man hours spent reviewing the plans. Attached herewith is a
revised resolution with a new fee schedule reflecting that the permit issuance fee be $75.00 and that the permit
plan check fee will be at a rate of $84.50 per hour.
SKW
Attachment
RECEIVED �OF vp
FEB 2.8 2011
�
CITY CLERK'S OFFICE
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: Mark C. Whitworth, City Administrator
FROM: Samuel Kevin Wilson, Director of Community Services & Water
DATE: February 23, 2011
SUBJECT: Encroachment Fee Resolution
City of Vernon staff recently met with Southern California Gas Company officials to discuss the City
of Vernon's proposed Encroachment fee resolution. The City had proposed to establish a new permit issuance
fee of $330.00 for an encroachment permit. The City had calculated this fee based on the number of man hours
an average permit application took to process, including administrative processing, reviewing and approving the
insurance provided, plan checking the drawings submitted, reviewing traffic control plans and performing
necessary research in order to determine that any excavations did not interfere with existing utilities. The Gas
Company questioned why the permit fee that was originally proposed was changed from $75.00 to $330.00.
They did not question the amount, but how it was derived. City staff advised the Gas Company that the permit
fee originally proposed only included the administrative cost, but the fee now included all plan checking
services which had not previously been accounted for.
After further consideration City Staff is recommending that the permit issuance fee only reflect the
administrative cost to the City. Encroachment permit projects can vary in complexity from projects requiring
street closures with complex traffic detouring, pipelining projects that can stretch for miles, to a simple pothole
in a parking lane requiring no traffic detouring. Therefore it is not possible to have one average plan check fee
that can covered the variety of projects the City will be permitting. Staff is now recommending that a separate
plan check fee be charged based on the number of man hours spent reviewing the plans. Attached herewith is a
revised resolution with a new fee schedule reflecting that the permit issuance fee be $75.00 and that the permit
plan check fee will be at a rate of $84.50 per hour.
SKW
Attachment
DRAFT 11
1 RESOLUTION NO.
2
3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON ESTABLISHING AND ADOPTING ENCROACHMENT,
4 LICENSE AND FRANCHISE FEES AND DEPOSIT SCHEDULES
PURSUANT TO CHAPTER 22, ARTICLE VI OF THE VERNON
5 CITY CODE AND REPEALING RESOLUTION NO. 5088
6
7 WHEREAS, Chapter 22, Article VI of the Vernon City Code
specifies that the City Council of the City of Vernon shall, from time
8
9 to time, establish an encroachment fee and deposit schedule, a license
10 fee schedule and a franchise fee schedule and shall set the amount of
11 certain bonds and establish liability insurance requirements; and
12 WHEREAS, on February 21, 1984, the City Council of the City
13 of Vernon adopted Resolution No. 5088 adopting encroachment, license
14 and franchise fees and deposit schedules pursuant to Chapter 22 of the
Vernon City Code; and
15
16 WHEREAS, on 2010, the City Council of the
17 City of Vernon adopted Ordinance No. 1175 providing for the
18 establishment of a three-year restriction on cuts to newly paved or
19 resurfaced streets, a two-year restriction on slurry sealed or chipped
20 sealed streets, and amending the Code regarding deposits or surety
21 bonds and liability insurance for encroachment permits and licenses;
and
22
23 WHEREAS, the Director of Community Services & Water by memo
24. dated September 20, 2010, recommended that the fees for
encroachments, licenses and franchises be increased to reflect the
25
26 increase in the cost of service provided.
27 II
M
DRAFT 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct
SECTION 2: Any and all work performed by governmental
agencies, utility companies and private contractors within street
right-of-way, including, without limitation, closing of traffic lanes,
detouring traffic or interfering with the normal parking pattern or
the pedestrian use of the sidewalk, shall only be conducted pursuant
Ito a permit issued by the City.
SECTION 3: The City Council of the City of Vernon hereby
establishes the encroachment, license, franchise and related fees as
set forth in the schedule attached hereto as Exhibit.A and incorporated
herein by reference. The fees set forth in Exhibit A shall be paid
before the issuance of any permit, or the approval of any franchise or
license.
SECTION 4: The following exemptions to Section 3 shall
apply:
A. Utility companies and other governmental agencies shall
not be required to make prior payment of issuance fees or make security
deposits where an express provision of a franchise agreement with the
City provides a different arrangement.
B. The City of Vernon Water Department, Light & Power
Department, Fiber Optic Division, and Gas Department shall not be
required to pay inspection, street damage restoration, and permit fees
inasmuch as the costs for permit services are accounted for internally
for the City departments.
- 2 -
DRAFT 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
C. No fees shall be charged to governmental agencies with
reciprocal agreements.
SECTION 5: Effective the applicant for
any franchise, license, or encroachment permit shall provide general
commercial liability insurance in an amount determined by the Risk
Manager and approved by the City Attorney of the City of Vernon prior
to the issuance of each franchise, license or encroachment permit.
SECTION 6: The City's Risk Manager shall require, in
connection with any policy or policies of insurance required by
Chapter 22, Article 6, that the insurance policy or policies name the
City of Vernon as an additional insured, and shall further provide that
said policy or policies may not be cancelled without giving the City of
Vernon. at least ten (10) days written notice of the insurer's intention
to so cancel said policy or policies.
SECTION 7: Prior to the issuance of an encroachment permit
a faithful performance bond payable to the City of Vernon shall be
provided to the City in an amount as set forth in the schedule attached
hereto as Exhibit B and incorporated herein by reference.
SECTION 8: In addition to the above, the franchisee or
Ilicensee shall pay all fees and deposits necessary to obtain the
required encroachment permits.
SECTION 9: The issuance fee and annual renewal fee for
franchises and licenses shall be revised as follows:
A. The issuance fee and annual renewal fee provided for
herein shall be adjusted annually to account for inflation based on the
Engineering News Record (ENR) Construction Cost Index. Beginning
July 1, 2011 and every July 1 thereafter, the issuance fee and annual
renewal fee will automatically increase by an amount calculated using
- 3 -
IDRAFT 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
the following formula - multiply the most recent issuance fee and
annual renewal fee in effect by the percentage increase over the
previous 12 months immediately preceding the most recent publication of
the ENR Construction CostIndexexisting on July 1 of the year of the
increase. There shall be no reduction in fees by operation of this
provision.
B. In the event the ENR Construction Cost Index is
discontinued such other Index or computation shall be used in order to
obtain substantially the same result that would be obtained if the ENR
Construction Cost Index had not been discontinued.
SECTION 10: The fees provided for herein shall be
effective , and all resolutions, or parts of
resolutions, not consistent with or in conflict with this Resolution,
including specifically Resolution No. 5088, are hereby superseded by
this Resolution.
SECTION 11: The City Clerk of the City of Vernon shall
certify to the passage, approval and adoption of this resolution, and
the City Clerk of the City of Vernon shall cause this resolution and
her certification to be entered in the Book of Resolutions of the
Council of this City.
- 4 -
DRAFT 11
1
2
3
4
5
61
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
APPROVED AND ADOPTED this
ATTEST:
WILLARD YAMAGUCHI, City Clerk
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
day of
2010.
Name:
Title: Mayor / Mayor Pro-Tem
I, WILLARD YAMAGUCHI, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution
No. was duly passed, approved and adopted by the City Council
of the City of Vernon at a regular meeting of the City Council duly
held on Monday, and thereafter was duly signed by the
Mayor or Mayor Pro-Tem of the City of Vernon
Executed this day of 2010, at Vernon, California.
WILLARD YAMAGUCHI, City Clerk
(SEAL)
- 5 -
DRAFT 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EXHIBIT A
ENCROACHMENT, LICENSE & FRANCHISE
FEES
FEE
PERMIT ISSUANCE FEE
$75.00
PERMIT INSPECTION AND
PLAN CHECK FEES
RATE
REGULAR TIME (7:00 A.M.-5:30 P.M.)
$84.50/HR.
OVERTIME-FRIDAY, SATURDAY,
SUNDAY, HOLIDAYS AND NIGHTS (4
HRS. MINIMUM)
$84.50/HR.
ANNUAL PERMIT FEE FOR ROUTINE
MAINTENANCE (NO STREET CUTS)
$500.00
RECONSTRUCTION FEES FOR
RATE
MINIMUM
WORK COMPLETED BY CITY
ASPHALT PAVEMENT
$11.75/SQ. FT.
$1,500.00
CONCRETE PAVEMENT
AND DRIVEWAY
$13.25/SQ. FT.
$1,500.00
CONCRETE SIDEWALK
$6,75/SQ. FT.
$1,000.00
CONCRETE CURB &
GUTTER
$35.00/LIN. FT.
$1,500.00
ASPHALT, CONCRETE &
SOIL REMOVAL
$9.00/SQ. FT.
$1,000.00
TREE REMOVAL
$725.00 EACH
$ 725.00
TREE PLANTING
$800.00 EACH
$ 800.00
LIGHTS, BARRICADES, OR
WARNING DEVICES
$100.00/SERVICE CALL
PLUS $2.50/BARRICADE/DAY
$100.00 plus $2.50/
BARRICADE/DAY
FURNISHED AND/OR
MAINTAINED
MONUMENT REPLACEMENT
$2,000.00/monument
$2,000.00
ALL OTHER DIRECT COSTS
TO THE CITY RESULTING
FROM THE PERMITEE'S
ACTIVITY, CALCULATED AT
ACTUAL COST PLUS
- 6 -
DRAFT 11
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
ADMINISTRATIVE COSTS
15%
FRANCHISES AND LICENSES
(ISSUANCE & ANNUAL
ISSUANCE
ANNUAL
RENEWAL)
RAILROAD CROSSINGS,
CONVEYOR BRIDGES, AND
TUNNELS ACROSS A
STREET
$25, 000.00
$2, 500.00
RAILROAD TRACKS,
$25,000.00 FOR EACH ONE-HALF (1/2)
$2,500.00 FOR
PIPELINES OR CONDUITS
MILE OR PORTION THEREOF
EACH ONE-HALF
ALONG A STREET
(1/2) MILE OR
PORTION
THEREOF
FOR PIPELINES OR
CONDUITS ACROSS A
STREET OR A METERING
MANHOLE IN THE STREET
$12,500.00
$1,250.00
FOR BUILDING FOOTINGS
AND APPENDAGES,
""TRAFFIC SENSORS, SIGNS
AND ARCHITECTURAL
PROJECTIONS
$5,000.00
$500.00
- 7 -
DRAFT 11
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EXHIBIT B
ENCROACHMENT PERMIT FAITHFUL PERFORMANCE BOND OR
CASH DEPOSIT REQUIREMENTS
The amount of an encroachment permit performance bond or cash deposit shall be determined
by multiplying the quantity of asphalt paving, concrete paving, sidewalk, concrete curb,
monuments and trench excavations proposed to be removed, disturbed or opened by the rate
shown in the table below, the sum of the totals shall establish the minimum amount of the bond
or deposit, except that in no case shall the faithful performance bond or cash deposit be less .
than $5,000.
TYPE OF WORK TO BE
PERFORMED
RATE
ASPHALT PAVEMENT
$17.75/SQ. FT.
CONCRETE PAVEMENT
AND DRIVEWAY
$19.75/SQ. FT.
CONCRETE SIDEWALK
$10.25/SQ. FT.
CONCRETE CURB &
GUTTER
$52.50/LIN. FT.
TRENCH EXCAVATIONS
$7,500.00/EACH OPEN EXCAVATION
MONUMENT
REPLACEMENT
$3,000.00/MONUMENT
- 8 -