Resolution No. 2011-053RESOLUTION NO. 2011-53
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON AUTHORIZING THE ISSUANCE OF A REQUEST FOR
PROPOSALS FOR GROUNDS MAINTENANCE.SERVICES FOR CITY
HALL AND RELATED FACILITIES
WHEREAS, the City of Vernon is interested in obtaining
proposals from qualified contractors to provide grounds maintenance
services at.City Hall, Fire Station No. 2; Light & Power, Petrelli
Building, Public Works Yard, 50th Street Apartments and related
facilities; and
WHEREAS, the Director of Community Services & Water has
requested the issuance of a request for grounds maintenance services
at City Hall, Fire Station No. 2, Light & Power, Petrelli Building,
Public Works Yard, 50th Street Apartments and related facilities
(the "RFP").
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The City Council of the City of Vernon hereby
directs the City Administrator, or his designee, to issue in
accordance with Vernon City Code Section 2.29-2 the RFP, a copy of
which is attached hereto as Exhibit A, to one or more qualified
contractors, and to report to the City Council on the proposals
received with a recommendation for action.
SECTION 3: The City Clerk of the City of Vernon shall
certify to the passage, approval and adoption of this resolution, and
the City Clerk of the City of Vernon shall cause this resolution and
the City Clerk's certification to be entered in the File of
Resolutions of the Council of this City.
APPROVED AND ADOPTED this 5th day of April, 2011.
Hilario Gonzales
Name:
Title: Mayor /-
- 2 -
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
I, Willard G. Yamaguchi, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution
No. 2011-53, was duly passed, approved and adopted by the City Council
of the City of Vernon at a regular meeting of the City Council duly
held on Tuesday, April 5, 2011, and thereafter was duly -signed by the
Mayor or Mayor Pro-Tem of the City of Vernon.
Executed this day of April, 2011, at Vernon, California.
(SEAL)
- 3 -
EXHIBIT A
COMMUNITY SERVICES & WATER DEPARTMENT
Samuel Kevin Wilson, Director of Community Services & Water.
4305 Santa Fe Avenue, Vernon, California 90058
Telephone (323) 583-8811 Fax (323) 826-1435
CITY OF VERNON
REQUEST FOR PROPOSAL
GROUNDS MAINTENANCE SERVICES
March 2011
The City of Vernon is seeking proposals and statements of qualifications from qualified
contractors to provide Grounds Maintenance Services to the City of Vernon.
PROPOSAL FORMAT
The proposal shall include, at minimum, the following items:
• Letter of Transmittal.
• Executive Summary — Limit to two pages.
• Understanding of, and approach to, the project.
• Experience with similar projects for the past three years and related references.
• Qualifications of the firm's members and their commitment to the project.
• A detailed description of the Scope of Work.
• Proposed schedule.
• Professional fees in a separate sealed envelope.
The following items address general proposal preparation issues:
The contractor is solely responsible for any costs incurred by responding to this Request for
Proposal.
• The proposal shall be signed by an official or representative authorized to bind the firm
to a Contracting Services Agreement with the City Contract and the Proposal.
• The contractor shall comply with all Federal, State and Local regulations governing any
aspect of the project, including conflict of interest laws and regulations.
E .clusivefy Industfid
• The contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of the contractor; state that all qualified applicants will receive consideration for
employment without regard to race; color, religious creed, national origin, ancestry,,
physical handicap, medical condition, marital status, or sex.
• The contractor shall cooperate with the City and shall promptly and appropriately
respond to feedback made by the City.
• All work shall be performed in accordance with usual and customary standards of care_.
for similar work performed.
• City action on proposals normally will be taken within 45 days of opening; however, no
guarantee or representation is made herein as to the time between the proposal opening
and subsequent action:
PROPOSAL SELECTION
The City reserves the right to accept or reject any and/or all proposals, to waive irregularities and
technicalities;. and to request resubmission. There is no obligation on the part of the City to award
the contract to the lowest bidder. The City reserves the right to award the contract to the most
qualified bidder who submits a. responsive proposal with a resulting negotiated agreement that is
most advantageous to and in the best interests of the City. The City shall be the sole judge of the
proposal and the resulting negotiated agreement, and its decision shall be final.
CONTRACTING SERVICES AGREEMENT
A sample of the City's Standard Professional Contracting Services Agreement and Insurance
Requirements that the successful Proposer will be required to enter into with the City are herein
attached. Proposers are strongly advised to review all the terms and conditions of the sample
Agreement. If the Proposer takes exception to any provision of the attached sample Agreement,
the Proposer, must specify each provision and give a detailed statement of why he takes exception
to each such provision. The extent to which the Proposer takes exception to provisions in the
Agreement will be considered and evaluated in the Agreement award. Submission of the
proposing firm's standardagreement as a part of the proposal will not be accepted.
JOB WALK
A Job Walk will be held on Tuesday, April 19, 2011, at 9:00 AM. Please contact Scott Rigg at
(323) 583-8811, extension number 279, for further details.
PROPOSAL. SUBMITTAL
The proposal and fees shall be submitted to Samuel Kevin Wilson, Director of Community
Services, 4305 Santa Fe Avenue, Vernon, CA 90058, no later than 2:00 P.M. on Tuesday, April
26, 2011. The contractor shall submit four (4) copies of the subject proposal and fee schedule.
The fee schedule shall be submitted in a separate sealed envelope.
2
SCOPE OF WORK
(See photographs attached to RFP package depicting work locations)
1. Litter Control:
A. Weekly: (City Hall, Petrelli Building & Fire Station No. 2)
1. Perform comprehensive evaluation of grounds to ensure they are kept litter free. Any removed litter
shall be disposed of in a designated disposal area:
B. Weekly: (Light & Power & 50th Street Apartments)
1. Perform comprehensive evaluation of grounds to ensure_ they are kept litter free. Any removed litter
shall be disposed of in a designated disposal area.
2. Lawn Care:
A. As Needed: (City Hall & Light & Power)
1. Lawns shall be maintained in accordance with the best practices of the trade and horticultural
procedures, As such, the lawns shall be kept weed free and be fertilized as needed.
3. General Landscaping Maintenance:
A. Weekly: (City Hall & Fire Station No. 2)
1. Perform General Landscaping Maintenance including trimming, weeding, fertilization, planting,
herbicide application, and irrigation maintenance.
B. Weekly: (Public Works Yard, Light & Power, Petrelli Building, and 50th Street Apartments)
1. Perform General Landscaping Maintenance including trimming, weeding, fertilization, planting,
herbicide application, and irrigation maintenance.
4. Seasonal Flower. Planting:
A. Three Times Annually: (City Hall Monument Planter)
1. Perform Seasonal Flower Planting three times annually. The variety of flower to be planted shall be
determined by the City of Vernon Grounds Maintenance Foreman.
Scope of Work — Optional
1. Litter Control:
A. Weekly: (Fire Station No. 1, Fire Station No. 3, Fire Station No. 4)
3
1. Perform comprehensive evaluation of grounds to ensure they are kept litter free. Any removed litter
shall be disposed of in a designated disposal area.
B. Weekly: (37th Street Median, Bandini Boulevard Median East of Ayers Avenue, Bandini
Boulevard Median East of Downey Road; District. Boulevard Median between 50th Street &
Fruitland Avenue & Bandini Boulevard Median & Turning Pocket East of Atlantic Boulevard)
1. Perform comprehensive evaluation of grounds to ensure they are kept litter free. Any removed litter
shall be disposed of in a designated disposal area.
2. General Landscaping Maintenance:
A. Weekly: (Fire Station No. 1, Fire Station No. 3, & Fire Station No. 4)
1. Perform .General Landscaping Maintenance including trimming, weeding, fertilization; planting,
herbicide application, and irrigation maintenance.
B. Weekly: (37t" Street Median, Bandini Boulevard Median East of Ayers Avenue, Bandini
Boulevard Median East of Downey Road, District Boulevard Median between 50th Street &
Fruitland Avenue & Bandini Boulevard Median & Turning Pocket East of Atlantic Boulevard)
1. Perform General Landscaping- Maintenance including trimming, weeding, fertilization, planting,
herbicide application, and irrigation maintenance.
3. Lawn Care:
A. As Needed: (Fire Station No. 1, Fire Station No. 3, & Fire Station No. 4)
1. Lawns shall be maintained in accordance with the best practices of the trade and horticultural
procedures. As such, the lawns shall be kept weed free and be fertilized as needed.
4
GENERAL REQUIRMENTS
1) City staff shall not be required to inform contractor when to perform as needed
maintenance/cleaning; the contractor is expected to anticipate the need and, if within the
scope of the. Agreement; perform the required services.
2) The contractor shall provide. a call out list .with regularly updated telephone numbers to
handle emergency or unusual grounds maintenanceservices.
3) The contractor shall provide a. list of all employees and their supervisors who may work
upon the City's premises.
4) A periodic meeting to review service performance will be conducted at the request of the
City. Attendees shall include the City's Public Works & Water Superintendent, a
representative of the contractor, and City Foreman or his designee.
5) Licenses and Permits:
The contractor shall maintain a. C27 California Landscape Contractor's license, and will
comply with all other license and permit requirements of the City, State and Federal
Governments, as well as other requirements of the law.
6) Sign -in Requirement:
A log sheet shall be provided by the City. All employees assigned by the contractor to
work in each facility shall sign in at the beginning of the work shift and upon leaving that
facility:
7) Supervision and Inspection:
It is mandatory that the contractor have a supervisor on duty 7 days a week and that a
pager be issued to him/her. The pager number must be given to the Building Maintenance
Foreman or his designee on the effective date of the Agreement or before services under
the Agreement are performed.
8) Uniforms:
The contractor shall provide appropriate work uniforms for all personnel. Uniforms shall
be worn at all times while performing work in City facilities. The name of the company
must appear on the front of each uniform. Each employee shall have a picture
identification nametag with company name pinned on front of uniform at all times.
9) General. Work Provisions:
1) The contractor shall be required to assign a designated English-speaking supervisor as
project supervisor.
5
2) The contractor shall provide an annual maintenance schedule outlining specific tasks to
be performed.
10) Equipment and Supplies:
All equipment and supplies necessary to.perform the requested services, including but not
liiriited to tractors; lawn mowers, edgers; trucks,, seed mulch, fertilizers, pesticides; and
replacement plant materials. All supplies will be of a name brand and not privately
labeled.
11) Reasonable Time Frames are defined as follows:
1) Einergency.service notification must be responded to within two hours.
2) Areas impacted and affected. by health and safety issues shall be barricaded to inform
the public and City personnel of potential dangers in that area..
3) All other issues will receive written notification ("Punch List") giving two (2) working
days for completion. If the deficiency is not corrected within the required two-day period,
any item that has not been corrected may be completed by the City or by other contractual
services and actual costs will be charged to the contractor without further notification.
12) General Conditions:
1) All damages that, in the City's opinion, are due to the contractor's operation shall be
repaired at the contractor's expense.
2) The contractor shall meet standards of local, state, and federal requirements including
safety regulations for equipment. All personnel shall be equipped with proper Personal
Protective Equipment.
3) It shall be the contractor's responsibility to inspect and identifyany practices and
conditions that render any portion of the maintained areas unsafe.
4) If any person employed by the contractor, or any subcontractor, fails or refuses to carry
out the directions of City management or, in the City's opinion, is incompetent, disorderly,
or uses threatening or abusive language to any person on the work site, that employee or
subcontractor shall be discharged from the project immediately.
5) The contractor warrants that in the performance of this Agreement, it shall comply with
all Federal, State and local laws and ordinances.
G.
SPECIFICATIONS FOR STANDARD WORK PRACTICES
Mowing:
The contractor shall, prior to mowing, thoroughly clean their mowing: equipment to ensure
seeds from different <species of .grass do not contaminate the ICity's lawns:_ Lawns shall be.
mowed at a height between 2" and 3". The contractor shall. adjust lawn mowing height if
requested by the City of Vernon Grounds Maintenance Foreman. Trash and debris; if
present, shall be removed and disposed of prior to mowing. All rotary mowing equipment
will have the blades replacedwithsharpened blades on a weekly basis, so as not to tear the
grass:
Trimming:
The contractor shall be responsible at every mowing for trimming around trees, sign posts,
near buildings, and any. other part of the lawn area where lawn mowers may not be able to
reach during mowing. Trimmed areas shall be at the same level as the mowing level of the
lawn. Care will be taken to avoid damaging trees, shrubs, buildings, and objects.
Shrub and Bed Maintenance:
1) All small ornamental trees shall be pruned to remove dead, diseased, and miss -shaped
limbs. All limbs that are -removed shall be done so in accordance with the best practices of
the trade and horticultural procedures.
2) Small flowering and multi-trunked tress shall be pruned in accordance with the
standards for the particular species.
Tree Care.-
1) The contractor shall remove dead. limbs and branches from all trees on an as needed
basis. Any branch perceived as a safety issue will be removed immediately. All cuts shall
be in accordance, with trade standards and horticultural procedures.
2) The contractor shall immediately prune trees obstructing pedestrian or automobile
traffic. If the tree in question cannot be maintained in an acceptable aesthetic manner, the
contractor shall recommend removal to the Grounds Maintenance Forman. The contractor
shall not perform any tree removals until such time that he/she receives written approval
from the Grounds Maintenance Forman.
3) The contractor shall prune all trees on an annual basis, per horticultural acceptable
standards, in order to maintain the aesthetic properties of the specific tree. species.
Weed Control:
1) All shrubs and groundcover beds, shall be kept weed and liter free.
7
2) Broadleaf weed_ s shall be removed by hand and/or by application of a non -selective
herbicide.
3) Weeds growing in sidewalks, curbs, gutters,. medians, and parking areas shall be
removed continuously during the term of this agreement.
4) Pre -emergent shall be added to all shrubs and groundcover beds. This application shall
be done on an as needed basis, which shall be determined by the Grounds Maintenance
Forman.
Irrigation Svstem Maintenance:
1) The contractor shall perform an audit to ensure adequate irrigation coverage is
achieved; clocks, valves, and sprinkler heads are functioning as designed.
2) The contractor shall check irrigation facilities for leaks and repair as necessary.
Ongoing Irrigation System : Maintenance:
The contractor shall adjust heads, clean nozzles and valves, monitor all.parts and irrigation
schedules to make sure the. system is operating correctly and efficiently. The City of
Vernon Grounds Maintenance Foreman will ensure that the irrigation system is functional
at the start of this agreement.
RI
FACILITY
MONTHLY COST
City Hall
Fire Station No. 2
Light.& Power
Petrelli Building
Public Works. Yard
50th Street A artments
TOTAL COST PER MONTH
OPTIONAL BID ITEMS
FACILITY
MONTHLY COST
Fire Station No. 1 & Training Yard
Fire Station No. 3
Fire Station No. 4
37th. Street Median
Bandini Boulevard Median East of Ayers
Avenue
Bandini Boulevard Median East of Downey
Road
District Boulevard Median between 50th Street
& Fruitland Avenue
Bandini Boulevard Median and Turning Pocket
East of Atlantic Boulevard
TOTAL COST PER MONTH
I
MR
NAM
FjQ
�._ Pill
�- 1h . k 'r � �'�� �'. ,�%'e��}�ys`' n,
.. ..
Nam
- x-_ ..MI
i
AQ
Az
OlbOxt
y
�5S .: aS - �',ri _.Y4 ;' FC�k� _ a�q � 4.2. _.-. - �" s , . .. ,. � �'.• �' -..Z"3 .. i -3�{
� 7��� +�-,§ ��� �.,k?c., ''l �` .�. e.k i ; -�, -9 T.�__ '�"-�,�`��Y �` is 1 �'•Y•'�.
,�'��„� = � � ma's �� a 4i 7 t �,`� �i � � ,fit .�� �° ♦ � _ � rw--� �t r� �
M7Vill
Aug
KGO
iS r
-ma-n yDate 1 1-172-09 ( 1997 .. ., - .e`i�7%4- N1 :?7':7 c1�. 295 f'
14 :'3E 1497
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
50th Street Apartments
M
p
i
s
PP j]
43.g a 'utss �ki�4�zx Si._vi . �d� V
e
� -T .._
RR
�� urn
r
NMI
I'�z�'. .
SOL of
77,
�;.
_t e_' a;
Jim' 40
WPM
F. R
o
�g
.__
Law 7D
yY
c"3.t �fE9
Vi
r
sm
o f'Alin
34, diN It2'121?S3 Net to
VE
1.7li� ---, - - j7y -, g
we
geo�
/� � �
\
:5 64-A- Me`
F7
_}
5
,m
fffifp
Ox-
CITY CLERK'S OFFICE
INTEROFFICE MEMORANDUM
DATE: April 7, 2011
TO: S. Kevin Wilson, Director of Community Services & Water
FROM: Willard Yamaguchi, City Clerk
RE: Resolution No. 2011-53 — A Resolution of the City Council of the City of Vernon
Authorizing the Issuance of a Request for Proposals for Grounds Maintenance Services for
City Hall and Related Facilities
Transmitted herewith is a copy of Resolution No. 2011-53 referenced above, which was approved by City
Council on April 5, 2011.
Thank you.
WY:dj
Attachment
c: Purchasing Department
Resolution No. 2011-53
RECEIVED
MAR 2 2 2011
CITY ADMINISTRATION
STAFF REPORT
COMMUNITY SERVICES & WATER DEPART
DATE: March 21, 2011
TO: Honorable Mayor and City Council
FROM: Samuel Kevin Wilson„ Director of Community Services & Water
RE: Permission to Seek Request for Proposals for Grounds Maintenance Services
The Department of Community Services and Water (Department) has prepared a Request for
Proposal (RFP) to seek bids from qualified contractors to perform Grounds Maintenance Services at City
Hall, Fire Station No. 2, Light & Power, Petrelli Building, Public < Works Yard, and 50"' Street -
Apartments. In addition, the 'RFP incorporates an Optional Bid Item Section that. includes Ground
Maintenance Services for Fire Station No. land Training Yard; Fire Station No 3, Fire Station No. 4, 37th
Street Median, Bandim Boulevard Median East of Ayers, Bandini Boulevard Median EastofDowney
Road, District Boulevard Median between 50th Street and Fruitland Avenue, and Bandini< Boulevard
Median and Turning Pocket East of :Atlantic Boulevard. The Optional Bid Item Section can be used to
ascertain if any further cost saving opportunities may exist at the.above-mention facilities.
Moreover, preliminary cost estimates indicate that a contractor can potentially perform the
subject functions at a far lower cost that can be done in-house. In addition, those crewmembers currently
assigned to the Grounds Maintenance functions can be shifted to other Department sections once a
contractor is selected in order to make up for staffing shortages as a result of attrition. It is important to -
bid the Grounds Maintenance Services to allow the Department to perform an in-depth cost analysis of
current market rates associated with Grounds Maintenance Services. This will allow for enhanced
quantification of potential cost savings for the City at large.
The RFP for Grounds Maintenance Services at City Hall, Fire Station No 2, Light & Power,
Petrelli Building, Public Works Yard, 50th Street Apartments, and Optional Bid Items is herein attached.
It is my recommendation that the City Council grant the Department permission to seek RFP's from
qualified' contractors to perform Grounds Maintenance Services at the April 5, 2611, City Council
meeting. Thank you.
SKW/sr
Enclosures
of VP
i I ,009' may,
ED
e
R.EC OY( MMUNITY SERVICES & WATER DEPARTMENT
MAR 2 3 2011 OFFICE MEMORANDUM
CITY CLERK'S OFFICE
TO: Mark' Whitworth, City Administrator
FROM: Samuel Kevin Wilsonirector of Community Services and Water
DATE: March 21, 2011
SUBJECT: Permission to Seek Request for Proposals for Grounds Maintenance Services
The Department of Community Services and Water (Department) has prepared a Request for Proposal
(RFP) to seek bids from qualified contractors to perform Grounds Maintenance Services at City Hall, Fire
Station No. 2, Light &Power, Petrelli Building, Public Works Yard; and 5W' Street Apartments. In addition, the
RFP incorporates an optional bid section that includes Ground Maintenance Services for Fire Station No. 1 and
Training Yard; Fire Station No. 3, Fire Station No. 4, 37`t Street Median, Bandim. Boulevard Median East of
Ayers, Bandini Boulevard Median East of Downey Road, District Boulevard Median between 50'b Street and
Fruitland Avenue, and Bandini Boulevard Median and Turning Pocket East of Atlantic Boulevard. "
Moreover, preliminary cost estimates indicate that a contractor can potentially perform the subject
functions at. a far lower cost that can be done in-house. In addition, those crewmembers currently assigned to the
grounds maintenance functions can be shifted to other sections once a contractor is selected in order to make up
for staffing shortages as a result of attrition.
The RFP for Grounds Maintenance Services is herein attached, along with a Staff Report
recommending that the City Council grant approval to issue RFP's to qualified contractors to perform the
above -mentioned functions at the April 5, 2011, City Council meeting. Thank you.
SKW/sr
Enclosures
F:\Scott\Scott\N1y Documents\Guunds Maintenance Contacting\Grounds Maintenance City Adminishator.doc
t
COMMUNITY SERVICES & WATER DEPARTMENT
Samuel Kevin Wilson, Director of Community Services & Water
4305 Santa Fe Avenue, Vernon, California 90058
Telephone (323) 583-8811 Fax (323) 826-1435
CITY OF VERNON
REQUEST FOR PROPOSAL
GROUNDS MAINTENANCE SERVICES
March 2011
The City of Vernon is seeking proposals and statements of qualifications from qualified
contractors to provide Grounds Maintenance Services to the City of Vernon.
PROPOSAL FORMAT
The proposal shall include, at minimum, the following items
• Letter of Transmittal.
+ Executive Summary - Limit to two pages.
• Understanding of, and approach to, the project.
• Experience with similar projects for the past three years and related references.
• Qualifications of the firm's members and their commitment to the project.
• A detailed description of the Scope of Work.
• Proposed schedule.
• Professional fees in a separate sealed envelope.
The following items address general proposal preparation issues:
The contractor is solely responsible for any costs incurred by responding to this Request for
Proposal.
• The proposal shall be signed by an official or representative authorized to bind the firm
to a Contracting Services Agreement with the City Contract and the Proposal.
• The contractor shall comply with all Federal, State and -Local regulations governing any
aspect of the project, including conflict of interest laws and regulations.
Excfusivefy Inddustriaf
• The contractor shall, in all solicitations- or advertisements for employees placed by or on
behalf of the contractor;state that all qualified applicants' will receive consideration for
employment without regard to race, color, religious creed, national origin, ancestry,
physical handicap, medical condition, marital status, or sex.
• The contractor shall cooperate with the City and shall promptly and appropriately
respond to feedback made by the City.
• All work shall be performed in` accordance with usual and customary standards of care
for similar work performed.
• City action on proposals normally will be taken within 45 days of opening; ,however, no
guarantee or representation is made herein as to the time between the proposal opening
and subsequent action.
PROPOSAL SELECTION
The City reserves the right to accept or reject any and/or all proposals, to waive irregularities and
technicalities, and to request resubmission: There is no obligation on the part of the City to award
the contract to the lowest bidder. The City reserves the right to award the contract to the most
qualified bidder who submits a responsive proposal with a resulting negotiated agreement that is
most advantageous to and in the best interests of the City. The City shall' be the sole judge of the
proposal and the resulting negotiated agreement, and its decision shall be final.
CONTRACTING SERVICES AGREEMENT
A sample of the City's Standard Professional Contracting Services Agreement and Insurance
Requirements that the successful Proposer will be required to enter into with the City are herein
attached. Proposers are strongly advised to review all the terms and conditions of the sample
Agreement. If the Proposer takes exception to any provision of the attached sample Agreement,
the Proposer must specify each provision and give a detailed statement of why he takes exception
to each such provision. The extent to which the Proposer takes exception to provisions in the
Agreement will be considered and evaluated in the Agreement award. Submission of the
proposing firm's-standard agreement as a part of the proposal will not be accepted.
JOB WALK
A Job Walk will be held on Tuesday, April 19, 2011, at 9:00 AM. Please contact Scott Rigg at
(323) 583--8811, extension number 279, for further details.
PROPOSAL SUBMITTAL
The proposal and fees shall be submitted to Samuel Kevin Wilson, Director of Community
Services, 4305 Santa Fe Avenue, Vernon, CA 90058, nolater than 2:00 P.M. on Tuesday, April
26, 2011. The contractor shall submit four (4) copies of the subject proposal and fee schedule.
The fee schedule shall be submitted in a separate sealed envelope.
2
II
i
GENERAL REQUIRMENTS
1) City staff shall not be required to inform contractor when to perform as needed
2) The contractor shall provide an annual maintenance schedule outlining specific tasks to
be performed.
1,0) Equipment and Supplies:
All equipment and supplies necessary to perform the requested services; including but not
limited to tractors, lawn mowers; edgers, trucks, seed mulch, fertilizers, pesticides, and
replacement plant materials. All; supplies will be of a name brand and not privately
labeled:
11) Reasonable Time Frames are defined as follows:
1) Emergency service notification must be responded to within two hours
2) Areas impacted and affected by health and safety, issues shall be barricaded to inform
the public and City personnel of potential dangers in that area.
3) All other issues will receive written notification ("Punch List") giving two (2) working
days for completion. If the deficiency is not corrected within the required two-day period,
any item that has not been corrected may be completed by the City or by other contractual
servicesand actual costs will be charged to the contractor without further notification.
12) General Conditions:
1) All damages that,; in the City's opinion; are due to the contractor's operation shall be
repaired at the, contractor's expense.
2) The contractor shall meet standards of local, state, and federal requirements including
safety regulations for equipment. All personnel shall be equipped with proper Personal
Protective Equipment.
3) It shall be the contractor's responsibility to inspect and identify any practices and
conditions that render any portion of the maintained areas unsafe.
4) If any person employed by the contractor, or any subcontractor, fails or refuses to carry
out the directions of City management or, in the City's opinion, is incompetent, disorderly,
or, uses threatening or abusive language to any person on the work site, that employee or
subcontractor shall be discharged from the project immediately.
5)'` The contractor warrants that in the performance of this Agreement, it shall comply with
all Federal, State and local laws and ordinances.
SPECIFICATIONS FOR STANDARD WORK PRACTICES
Mowing:
Weed Control:
1) All shrubs and groundcover beds shall be kept weed and liter free.
7
_ -
J - - -
9
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
City Hall, Petrelli Building, Fire Station No. 2
& Public Works Yard
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
City of Vernon Light & Power Department
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
50th Street Apartments
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
Fire Station No. 1
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
Fire Station No. 4
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
37th St. Median
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
Bandini Blvd Median e/o Ayers Ave.
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
Bandini Blvd. Median
(East of Downey Rd.)
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
District Blvd. Median
(Between 50th St. & Fruitland Ave.)
City of Vernon
Grounds Maintenance Services
General Area Map & Pictures For
Bandini Blvd. Median and Turning Pocket
(East of Atlantic Blvd.)