Resolution No. 2011-184RESOLUTION NO. 2011-184
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON TO ESTABLISH AND IMPLEMENT A RENEWABLE
ENERGY COST ADJUSTMENT FACTOR, PROCEDURE AND
COMPUTATION METHOD WHICH ESTABLISHES A RENEWABLE
ENERGY COST ADJUSTMENT TO BE BILLED UNDER ALL RATE
SCHEDULES FOR ENERGY DISTRIBUTED AND SUPPLIED TO
CITY OF VERNON ELECTRICAL CONSUMERS
WHEREAS, the City of Vernon ("City") is a chartered municipal
corporation of the State of California that owns and operates a system
for the generation, purchase, transmission, distribution and sale of
electric capacity and energy; and
WHEREAS, pursuant to law, as currently in effect and as may
be enacted in the future, the City is required to provide power and
energy in a manner consistent with environmental standards, including
providing a portion of the electricity delivered by the Electric System
from renewable energy sources, purchasing energy from permitted sources
including AB 32 costs, acquiring renewable energy credits in connection
with the Electric System resource portfolio, acquiring greenhouse gas
and other environmental allowances in connection with the power and
energy produced and/or acquired by the Electric System, and otherwise
satisfying mandates with respect to the power and energy of the
Electric System to protect and/or improve the environment (all actions
to satisfy such requirements being referred to in this resolution as
the acquisition of Renewable Energy); and
WHEREAS, the City Council of the City desires to approve,
establish and implement a Renewable Energy Cost Adjustment Factor
("RECAF") in connection with the acquisition of Renewable Energy; and
WHEREAS, the City Council of the City finds that such
adjustment is necessary for the sound financial position of the Light
and Power Department operating funds; and
WHEREAS, the implementation of the RECAF will be computed
based solely on the incremental costs in acquiring Renewal Energy as
provided in this resolution; and
WHEREAS, the City Council of the City intends to approve the
RECAF effective January 1, 2012, in accordance with this Resolution and
the exhibit attached hereto; and
WHEREAS, the adoption of the RECAF shall continue until
rescinded or amended by resolution of the City Council of the City.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The City Council of the City of Vernon hereby
approves and adopts the Procedures and the Computation Sheets of the
RECAF attached hereto as Exhibit A and incorporated by reference.
SECTION 3: The effective date of the implementation of the
RECAF shall be January 1, 2012, and shall continue until rescinded or
amended by resolution of the City Council of the City.
SECTION 4: The RECAF shall be computed for each month based
on the City's actual incremental cost of acquiring Renewable Energy for
that month over the cost of acquiring a like amount of power and energy
from conventional sources as determined pursuant to Exhibit A. Billing
for the RECAF will be applied based on actual costs for the second
previous month. For example, the RECAF applied to September bills will
be based on actual costs from July.
- 2 -
SECTION 5: The City Council hereby finds and determines
that it is the intent of the Director of the Light and Power Department
to not acquire any Renewable Energy subject to the RECAF until
January 1, 2013, and to consult with the Electric Rates Advisory
Committee.
SECTION 6: All existing rate schedules are hereby amended
to provide for the implementation of the RECAF.
SECTION 7: All resolutions, or parts of resolutions not
consistent with or in conflict with this resolution are hereby
repealed.
SECTION 8: The City Clerk of the City of Vernon shall
certify to the passage, approval and adoption of this resolution, and
the City Clerk of the City of Vernon shall cause this resolution and
the City Clerk's certification to be entered in the File of
Resolutions of the Council of this City.
APPROVED AND ADOPTED this 15th day of November, 2011.
Name: Hilario Gonzales
Title: Mayor / May% Pr em
- 3 -
STATE OF CALIFORNIA )
ss
COUNTY OF LOS ANGELES )
I, Willard G. Yamaguchi, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution
No. 2011-184, was duly passed, approved and adopted by the City Council
of the City of Vernon at a regular meeting of the City Council duly
held on Tuesday, November 15, 2011, and thereafter was duly signed by
the Mayor or Mayor Pro-Tem of the City of Vernon.
Executed this /7 day of November, 2011, at Vernon, California.
(SEAL)
- 4 -
EXHIBIT A
EXHIBIT A
City of Vernon
Procedures for Calculating the
Renewable Energy Cost Adjustment Factor
The Renewable Energy Cost Adjustment Factor (RECAF) will be applied based on kWhs
billed under all schedules to reflect the incremental costs of the City's providing power and
energy through the City's Electric System in a manner consistent with environmental standards
mandated pursuant to law, as currently in effect and as may be enacted in the future, including
providing a portion of the electricity delivered by the Electric System from renewable energy
sources, purchasing energy from permitted sources including AB 32 costs, acquiring renewable
energy credits in connection with the Electric System resource portfolio, acquiring greenhouse
gas and other environmental allowances in connection with the power and energy produced
and/or acquired by the Electric System, and otherwise satisfying mandates with respect to the
power and energy of the Electric System to protect and/or improve the environment (all actions
to satisfy such requirements being referred to in this Exhibit A as the acquisition of Renewable
Energy).
The Renewable Energy Cost Adjustment Factor, expressed to the nearest $0.0001 per
kilowatt-hour (kWh), is to be calculated pursuant to the following equation:
RECAF = (RPS — E*B)
Se
Where,
RECAF = Renewable Energy Cost Adjustment Factor per Kilowatt Hour sold.
RPS = Cost of acquiring Renewable Energy (expressed in dollars ($)).
E = Amount of Renewable Energy acquired and produced (expressed in Kilowatt
Hours).
B = Cost of conventional market power as determined by the City from time to
time (expressed in dollars ($)).
Se = Kilowatt hours sold.
RECAF Computation Sheet
Schedule REC-1 is attached to provide the computation sheet for all period once
implementation of the RECAF commences.
A-1
REC - I
City of Vernon
Renewable Energy Cost Adjustment Factor
Computation Sheet
For the Month of 20
Incremental Costs of Acquiring Renewable Energy
a. Cost of Acquiring Renewable Energy
b. Renewable Energy Acquired (kWh)
C. Cost of Conventional Market Power (per kWh)
d. Incremental Renewable Energy Cost to be recovered [a - (b * c)]
Calculation of Factor
e. Incremental Renewable Energy Cost to be recovered
f. Total Kilowatt Hours Sold (Se)
g. Renewable Energy Cost Adjustment Factor (e / f)
A-2
CITY CLERK'S OFFICE
INTEROFFICE MEMORANDUM
DATE: November 17, 2011
TO: Carlos Fandino, Director of Light &%Power
FROM: Willard Yamaguchi, City Clerk W-4T
RE: Resolution No. 2011-184 - A Resolution of the City Council of the City of Vernon to
Establish and Implement a Renewable Energy Cost Adjustment Factor, Procedure and
Computation Method Which Establishes a Renewable Energy Cost Adjustment to be
Billed Under All Rate Schedules for Energy Distributed and Supplied to City of Vernon
Electrical Consumers
Transmitted herewith is a copy of Resolution No. 2011-184 referenced above, which was approved by
City Council on November 15, 2011.
Thank you.
WY:dj
Attachment
c: Ordinance No. 2011-184
RECEIVED
NOV 10 2011
CITY CLERK'S OFFICE
C'CC4P
ci a�ivc�
1;;12011-1W
STAFF REPORT
LIGHT & POWER
DATE: November 9, 2011
CEWED
NOV 10 2011
CITY ADMINISTRATION
TO: Honorable Mayor and City Council
FROM: Carlos Fandino Jr., Director of Light & Power AA
RE: Renewable Energy Cost Adjustment
PURPOSE:
Senate Billx1_2 requires load serving entities such as the City of Vernon to increase the
amount of electricity generated from eligible renewable energy resources per year, so
that amount of renewable energy equals at least 33% of total retail sales of electricity
per year by December 31, 2020. Consistent with the requirements of the law, the City is
in the process of procuring long-term renewable power. The cost of the Renewable
Power to the City is not fully known at this time. Further, the City incurs Greenhouse
Gas allowance cost associated with power generation.
The City of Vernon Light & Power Department is proposing to add a "Renewable
Energy Cost Adjustment Factor" to its electric rate structure. The Renewable Energy
Cost Adjustment Factor will be applied based on kWh billed under all schedules to
reflect the incremental renewable power cost and the net Greenhouse gas cost. If
approved, the proposal makes the cost of renewable power cost and greenhouse gas
allowance cost a direct pass -through to customers outside the tariff approved electric
rates.
Another reason for the proposal is that Light & Power Department is currently in the
process of securing a bond. In order to prove credit worthiness to rating agencies and
bond holders, the City must be able show how it will meet State mandate renewable
power costs.
Computation of the RECAF will be in accordance with the Renewable Energy Cost
Adjustment Tariff attached as Exhibit A and Exhibit B. All existing electric rate schedules
have been amended to provide for the RECAF assessment. The "Renewable Energy
Cost Adjustment Factor" will be based on actual costs,
Page — 2
RECOMMENDATION
The City of Vernon Light and Power Department recommends the following:
1. The inclusion of the RECAF clause to all electric rate schedules be
approved.
2. The Renewable Energy Cost Adjustment Tariff as attached be approved
and be effective January 1, 2012.
3. The proposed Renewable Energy Cost Adjustment be a separate charge
on customer's bill in cents per kilowatt-hour consumed.
CRF:ah
Attachments
": i 17cClaffWJ0441
City of Vernon
Procedures for Calculating the
Renewable Energy Cost Adjustment Factor
The Renewable Energy Cost Adjustment Factor (RECAF) will be applied based
on kWh billed under all schedules to reflect the incremental renewable power cost and
the net Greenhouse gas cost; consisting of renewable power cost, the cost of conventional
market power in the base rates, the cost of greenhouse gas allowances associated with
power generation, AB32 implementation charges, and the proceeds from free greenhouse
gas allowances allocated to load serving entities.
The Renewable Energy Cost Adjustment Factor, expressed to the nearest
$0.0001per kilowatt-hour (kWh), is to be calculated pursuant to the following equation:
RECAF = (RPS — E*B) +(GHG +C — F)
Se
Where,
RECAF = Renewable Energy Cost Adjustment Factor per Kilowatt Hour sold.
RPS = Renewable power cost.
E = Renewable energy purchased.
B = The price of conventional market power in the base rates.
GHG = The cost of greenhouse gas allowances associated with power generation.
C = AB32 implementation charges.
F = Proceeds from free greenhouse gas allowances allocated to load serving entities
Se = Kilowatt Hours sold
ATTACHMENT B
RECAF Computation Sheet
Schedule REC-1 is attached to provide the computation sheet for all period once
implementation is completed.
Renewable Energy Cost Adjustment Factor (RECAF)
Items I through 2 represent the incremental renewable power cost and the net
Greenhouse gas cost which are to be used in computing the period's RECAF.
Line 1 represents the incremental renewable power cost, which is the renewable power
cost adjusted for the cost of conventional market power in the base rates.
Line 2 represents in the net greenhouse cost; including cost of greenhouse gas allowances
associated with power generation and AB32 implementation charges adjusted for the
proceeds from free greenhouse gas allowances allocated to load serving entities.
ATTACHMENT B
REC-1
City of Vernon
Renewable Energy Cost Adjustment Factor
Computation Sheet
For the Month of 20
Renewable Energy Costs
1. Incremental Renewable Power Cost
a. Renewable Power Cost
b. Renewable Energy Purchased
c. Price of Conventional Market Power in the Base Rates
d. Incremental Renewable Power Cost to be recovered,[ a - (b* c)]
2. Net Greenhouse Gas Cost
e. Cost of Greenhouse gas allowances
Associated with power generation
f. AB32 Implementation Charges
g. Proceeds from free greenhouse gas allowances allocated to
Load Serving Entities
h. Net Greenhouse gas cost, ( e + f — g )
Calculation of Factor
i. Renewable Cost to be recovered, (1+2)
j. Kilowatt Hours Sold (Se)
k. Renewable Energy Cost Adjustment Factor, ( i / j )
SUPPORTING DOCUMENTS
RERECEIVE
1 JUN 0 9 2016
9ff RE0' 1-9OR € CITY ADMINISTRATION
STAFF REPORT *
VERNON GAS & ELECTRIC DEPARTMENT
DATE: June 21, 2016
TO: Honorable Mayor and City Council
,01 . A^ ----
FROM: Peter Hervish, Interim Director of Vernon Gas & Electric Department
Originator: Abraham Alemu, Electric Resources Planning and Development
Manager
RE: Correction to the Procedures for Calculating the Renewable Energy Cost
Adjustment Factor
Recommendation
A. Find that (a) the Correction to the Procedures for Calculating the Renewable Energy Cost
Adjustment Factor is not in reference to a "project" subject to the California
Environmental Quality Act (CEQA) under Guidelines section 15378 because it involves
the administrative activity of correcting an existing procedure and (b) even if this
approval were a "project" subject to CEQA, the approval requested is exempt in
accordance with CEQA Guidelines Section 15301(b), the general rule that CEQA only
applies to projects that may have an effect on the environment because correcting the
procedures for calculating the renewable energy cost adjustment factor is purely an
administrative activity, and any construction that may occur by a private party in the
future in reliance on this approval would be subject to CEQA review by another
governmental agency at that time when actual details of any physical proposal would be
more than speculative; and
B. Approve the Correction to the Procedures for Calculating the Renewable Energy Cost
Adjustment Factor, in substantially the same form as attached herewith, for the purpose
to aligning the computation of the Renewable Energy Cost Adjustment Factor with the
intent of Resolution No. 2011-184.
Background
On November 15, 2011, City Council approved Resolution No. 2011-184. The Resolution
intended to establish and implement a Renewable Energy Cost Adjustment Factor and the
procedure and computation method which establishes a Renewable Energy Cost Adjustment to
be billed under all Rate Schedules.
Page 1 of 2
Pursuant to Section 4 of Resolution No. 2011-184, the Resolution intended for the Renewable
Energy Cost Adjustment Factor (RECAF) to be computed for each month based on the City's
actual incremental cost of acquiring renewable energy for that month over the cost of acquiring a
like amount of power and energy from conventional sources as determined pursuant to Exhibit
A. While the Resolution intended for the computation to be based on actual monthly cost
(dynamic in nature), one of the components in the formula for the RECAF as outlined in Exhibit
A is based on an historical value (static). Specifically, component `B" in the formula is set as
the price of conventional market power in the base electric rates instead of reflecting the cost of
power in the current (prevailing) month.
The Correction to the Procedures for Calculating the Renewable Energy Cost Adjustment Factor
will align the computation of the Renewable Energy Cost Adjustment Factor with the intent of
Resolution No. 2011-184. Specifically, the definition of component "B" in the RECAF formula
will be revised from: "The price of conventional market power in the base rates," to read "The
price of acquiring like amount of conventional market power for the month."
VG&E staff recommends that the Correction to the Procedures for Calculating the Renewable
Energy Cost Adjustment Factor, which has been reviewed and approved as to form by the City
Attorney's office, be approved in order to align the computation of the Renewable Energy Cost
Adjustment Factor with the intent of Resolution No. 2011-184.
Fiscal Impact
The proposed correction, if approved, will eliminate the time lag between the recognition of
revenues and expenses incurred in connection with the procurement of renewable energy
resources.
Attachment(s)
1. Attachments A and B to Exhibit A, clean
2. Attachments A and B to Exhibit A, redline
3. Resolution No. 2011-184
Page 2 of 2
ATTACHMENT A
City of Vernon
Procedures for Calculating the
Renewable Energy Cost Adjustment Factor
The Renewable Energy Cost Adjustment Factor (RECAF) will be applied based
on kWh billed under all schedules to reflect the incremental renewable power cost and
the net Greenhouse gas cost, consisting of renewable power cost, the cost of conventional
market power in'', tesfor the month for like amount, the cost of greenhouse gas
allowances associated with power generation, AB32 implementation charges, and the
proceeds from free greenhouse gas allowances allocated to load serving entities.
The Renewable Energy Cost Adjustment Factor, expressed to the nearest
$0.0001per kilowatt-hour (kWh), is to be calculated pursuant to the following equation:
RECAF = (RPS — E*B ) +(GHG +C — F)
Se
Where,
RECAF = Renewable Energy Cost Adjustment Factor per Kilowatt Hour sold.
RPS = Renewable power cost.
E = Renewable energy purchased.
B = The price of acquiring like amount of conventional market power for the
month.
GHG = The cost of greenhouse gas allowances associated with power generation.
C = AB32 implementation charges.
F = Proceeds from free greenhouse gas allowances allocated to load serving entities
Se = Kilowatt Hours sold
Formatted: Indent: Left: 0", Hanging: 1"
ATTACHMENT B
RECAF Computation Sheet
Schedule REC-I is attached to provide the computation sheet for all period once
implementation is completed.
Renewable Energy Cost Adjustment Factor (RECAF)
Items 1 through 2 represent the incremental renewable power cost and the net
Greenhouse gas cost which are to be used in computing the period's RECAF.
Line 1 represents the incremental renewable power cost. which is the renewable power
cost adjusted for the price of acquiring like amount of conventional market power for the
month, est of eefiveiiti fiat market power in the base Fates
Line 2 represents in the net greenhouse cost; including cost of greenhouse gas allowances
associated with power generation and AB32 implementation charges adjusted for the
proceeds from free greenhouse gas allowances allocated to load serving entities.
ATTACHMENT B
REC - 1
City of Vernon
Renewable Energy Cost Adjustment Factor
Computation Sheet
For the Month of 20
Renewable Energy Costs
1. Incremental Renewable Power Cost
a. Renewable Power Cost
b. Renewable Energy Purchased
c. Price of like amount Conventional Market Power in the for the month
d. Incremental Renewable Power Cost to be recovered,[ a - (b* c)]
2. Net Greenhouse Gas Cost
e. Cost of Greenhouse gas allowances
Associated with power generation
f AB32 Implementation Charges
g. Proceeds from free greenhouse gas allowances allocated to
Load Serving Entities
h. Net Greenhouse gas cost, ( e + f — g )
Calculation of Factor
i. Renewable Cost to be recovered, (1+2)
j. Kilowatt Hours Sold (Se)
k. Renewable Energy Cost Adjustment Factor, ( i / j )
ATTACHMENT A
City of Vernon
Procedures for Calculating the
Renewable Energy Cost Adjustment Factor
The Renewable Energy Cost Adjustment Factor (RECAF) will be applied based
on kWh billed under all schedules to reflect the incremental renewable power cost and
the net Greenhouse gas cost; consisting of renewable power cost, the cost of conventional
market power for the month for like amount, the cost of greenhouse gas allowances
associated with power generation, AB32 implementation charges, and the proceeds from
free greenhouse gas allowances allocated to load serving entities.
The Renewable Energy Cost Adjustment Factor, expressed to the nearest
$0.0001per kilowatt-hour (kWh), is to be calculated pursuant to the following equation:
RECAF = (RPS — E*B )+GHG +C — F)
Se
Where,
RECAF = Renewable Energy Cost Adjustment Factor per Kilowatt Hour sold.
RPS = Renewable power cost.
E = Renewable energy purchased.
B = The price of acquiring like amount of conventional market power for the
month.
GHG = The cost of greenhouse gas allowances associated with power generation.
C = AB32 implementation charges.
F = Proceeds from free greenhouse gas allowances allocated to load serving entities
Se = Kilowatt Hours sold
ATTACHMENT B
RECAF Computation Sheet
Schedule REC-1 is attached to provide the computation sheet for all period once
implementation is completed.
Renewable Energy Cost Adjustment Factor (RECAF)
Items 1 through 2 represent the incremental renewable power cost and the net
Greenhouse gas cost which are to be used in computing the period's RECAF.
Line 1 represents the incremental renewable power cost, which is the renewable power
cost adjusted for the price of acquiring like amount of conventional market power for the
month.
Line 2 represents in the net greenhouse cost; including cost of greenhouse gas allowances
associated with power generation and A1332 implementation charges adjusted for the
proceeds from free greenhouse gas allowances allocated to load serving entities.
ATTACHMENT B
REC - 1
City of Vernon
Renewable Energy Cost Adjustment Factor
Computation Sheet
For the Month of , 20
Renewable Energy Costs
1. Incremental Renewable Power Cost
a. Renewable Power Cost
b. Renewable Energy Purchased
c. Price of like amount Conventional Market Power for the month
d. Incremental Renewable Power Cost to be recovered,[ a - (b* c)]
Net Greenhouse Gas Cost
e. Cost of Greenhouse gas allowances
Associated with power generation
f. A1332 Implementation Charges
g. Proceeds from free greenhouse gas allowances allocated to
Load Serving Entities
h. Net Greenhouse gas cost, ( e + f — g )
Calculation of Factor
i. Renewable Cost to be recovered, (1+2)
j. Kilowatt Hours Sold (Se)
k. Renewable Energy Cost Adjustment Factor, ( i / j )
RESOLUTION NO. 2011-184
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON TO ESTABLISH AND IMPLEMENT A RENEWABLE
ENERGY COST ADJUSTMENT FACTOR, PROCEDURE AND
COMPUTATION METHOD WHICH ESTABLISHES A RENEWABLE
ENERGY COST ADJUSTMENT TO BE BILLED UNDER ALL RATE
SCHEDULES FOR ENERGY DISTRIBUTED AND SUPPLIED TO
CITY OF VERNON ELECTRICAL CONSUMERS
WHEREAS, the City of Vernon ("City") is a chartered municipal
corporation of the State of California that owns and operates a system
for the generation, purchase, transmission, distribution and sale of
electric capacity and energy; and
WHEREAS, pursuant to law, as currently in effect and as may
be enacted in the future, the City is required to provide power and
energy in a manner consistent with environmental standards, including
providing a portion of the electricity delivered by the Electric System
from renewable energy sources, purchasing energy from permitted sources
including AB 32 costs, acquiring renewable energy credits in connection
with the Electric System resource portfolio, acquiring greenhouse gas
and other environmental allowances in connection with the power and
energy produced and/or acquired by the Electric System, and otherwise
satisfying mandates with respect to the power and energy of the
Electric System to protect and/or improve the environment (all actions
to satisfy such requirements being referred to in this resolution as
the acquisition of Renewable Energy); and
WHEREAS, the City Council of the City desires to approve,
establish and implement a Renewable Energy Cost Adjustment Factor
("RECAFN) in connection with the acquisition of Renewable Energy; and
WHEREAS, the City Council of the City finds that such
adjustment is necessary for the sound financial position of the Light
and Power Department operating funds; and
WHEREAS, the implementation of the RECAF will be computed
based solely on the incremental costs in acquiring Renewal Energy as
provided in this resolution; and
WHEREAS, the City Council of the City intends to approve the
RECAF effective January 1, 2012, in accordance with this Resolution and
the exhibit attached hereto; and
WHEREAS, the adoption of the RECAF shall continue until
rescinded or amended by resolution of the City Council of the City.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the recitals contained hereinabove are true
and correct.
SECTION 2: The City Council of the City of Vernon hereby
approves and adopts the Procedures and the Computation Sheets of the
RECAF attached hereto as Exhibit A and incorporated by reference.
SECTION 3: The effective date of the implementation of the
RECAF shall be January 1, 2012, and shall continue until rescinded or
amended by resolution of the City Council of the City.
SECTION 4: The RECAF shall be computed for each month based
on the City,s actual incremental cost of acquiring Renewable Energy for
that month over the cost of acquiring a like amount of power and energy
from conventional sources as determined pursuant to Exhibit A. Billing
for the RECAF will be applied based on actual costs for the second
previous month. For example, the RECAF applied to September bills will
be based on actual costs from July.
- 2 -
SECTION 5: The City Council hereby finds and determines
that it is the intent of the Director of the Light and Power Department
to not acquire any Renewable Energy subject to the RECAF until
January 1, 2013, and to consult with the Electric Rates Advisory
Committee.
SECTION 6: All existing rate schedules are hereby amended
to provide for the implementation of the RECAF.
SECTION 7: All resolutions, or parts of resolutions not
consistent with or in conflict with this resolution are hereby
repealed.
SECTION 8: The City Clerk of the City of Vernon shall
certify to the passage, approval and adoption of this resolution, and
the City Clerk of the City of Vernon shall cause this resolution and
the City Clerk's certification to be entered in the File of
Resolutions of the Council of this City.
Wi
APPROVED AND ADOPTED this 15th day of November, 2011.
ity Clerk
Name: Hilario Gonzales
Title: Mayor / Mava�__PrRtiem
- 3 -
STATE OF CALIFORNIA )
} ss
COUNTY OF LOS ANGELES }
I, Willard G. Yamaguchi, City Clerk of the City of Vernon, do
hereby certify that the foregoing Resolution, being Resolution
No. 2011-184, was duly passed, approved and adopted by the City Council
of the City of Vernon at a regular meeting of the City Council duly
held on Tuesday, November 15, 2011, and thereafter was duly signed by
the Mayor or Mayor Pro-Tem of the City of Vernon.
Executed this /7 day of November, 2011, at Vernon, California.
(SEAL)
- 4 -
EXHIBIT A
EXHIBIT A
City of Vernon
Procedures for Calculating the
Renewable Energy Cost Adjustment Factor
The Renewable Energy Cost Adjustment Factor (RECAF) will be applied based on kWhs
billed under all schedules to reflect the incremental costs of the City's providing power and
energy through the City's Electric System in a manner consistent with environmental standards
mandated pursuant to law, as currently in effect and as may be enacted in the future, including
providing a portion of the electricity delivered by the Electric System from renewable energy
sources, purchasing energy from permitted sources including AB 32 costs, acquiring renewable
energy credits in connection with the Electric System resource portfolio, acquiring greenhouse
gas and other environmental allowances in connection with the power and energy produced
and/or acquired by the Electric System, and otherwise satisfying mandates with respect to the
power and energy of the Electric System to protect and/or improve the environment (all actions
to satisfy such requirements being referred to in this Exhibit A as the acquisition of Renewable
Energy).
The Renewable Energy Cost Adjustment Factor, expressed to the nearest $0.0001 per
kilowatt-hour (kWh), is to be calculated pursuant to the following equation:
RECAF = (RPS — E*B)
S,
Where,
RECAF = Renewable Energy Cost Adjustment Factor per Kilowatt Hour sold.
RPS = Cost of acquiring Renewable Energy (expressed in dollars ($)).
E = Amount of Renewable Energy acquired and produced (expressed in Kilowatt
Hours).
B = Cost of conventional market power as determined by the City from time to
time (expressed in dollars
Se = Kilowatt hours sold.
RECAF Comptutation Sheet
Schedule REC-1 is attached to provide the computation sheet for all period once
implementation of the RECAF commences.
A-1
REC - 1
City of Vernon
Renewable Energy Cost Adjustment Factor
Computation Sheet
For the Month of
Incremental Costs of Acquiring Renewable Energy
,20
a. Cost of Acquiring Renewable Energy
b. Renewable Energy Acquired (kWh)
C. Cost of Conventional Market Power (per kWh)
d. Incremental Renewable Energy Cost to be recovered [a - (b * c)]
Calculation of Factor
e. Incremental Renewable Energy Cost to be recovered
f. Total Kilowatt Hours Sold (S,,)
g. Renewable Energy Cost Adjustment Factor (e / f)
A-2
ATTACHMENT A
City of Vernon
Procedures for Calculating the
Renewable Energy Cost Adjustment Factor
The Renewable Energy Cost Adjustment Factor (RECAF) will be applied based
on kWh billed under all schedules to reflect the incremental renewable power cost and
the net Greenhouse gas cost; consisting of renewable power cost, the cost of conventional
market power in the base rates, the cost of greenhouse gas allowances associated with
power generation, AB32 implementation charges, and the proceeds from free greenhouse
gas allowances allocated to load serving entities.
The Renewable Energy Cost Adjustment Factor, expressed to the nearest
$0.0001per kilowatt-hour (kWh), is to be calculated pursuant to the following equation:
RECAF = (RPS — E*B)+(GHG +C — F)
Se
Where,
RECAF = Renewable Energy Cost Adjustment Factor per Kilowatt Hour sold.
RPS = Renewable power cost.
E = Renewable energy purchased.
B = The price of conventional market power in the base rates.
GHG = The cost of greenhouse gas allowances associated with power generation.
C = AB32 implementation charges.
F = Proceeds from free greenhouse gas allowances allocated to load serving entities
Se = Kilowatt Hours sold
ATTACHMENT B
RECAF Computation Sheet .
Schedule REC-1 is attached to provide the computation sheet for all period once
implementation is completed.
Renewable Energy Cost Adjustment Factor (RECAF)
Items I through 2 represent the incremental renewable power cost and the net
Greenhouse gas cost which are to be used in computing the period's RECAF.
Line 1 represents the incremental renewable power cost, which is the renewable power
cost adjusted for the cost of conventional market power in the base rates.
Line 2 represents in the net greenhouse cost; including cost of greenhouse gas allowances
associated with power generation and AB32 implementation charges adjusted for the
proceeds from free greenhouse gas allowances allocated to load serving entities.
ATTACHMENT B
REC - I
City of Vernon
Renewable Energy Cost Adjustment Factor
Computation Sheet
For the Month of , 20
Renewable Energy Costs
1. Incremental Renewable Power Cost
a. Renewable Power Cost
b. Renewable Energy Purchased
c. Price of Conventional Market Power in the Base Rates
d. Incremental Renewable Power Cost to be recovered,[ a - (b* c)]
2. Net Greenhouse Gas Cost
e. Cost of Greenhouse gas allowances
Associated with power generation
f. AB32 Implementation Charges
g. Proceeds from free greenhouse gas allowances allocated to
Load Serving Entities
h. Net Greenhouse gas cost, ( e + f — g )
Calculation of Factor
i. Renewable Cost to be recovered, (1+2)
j. Kilowatt Hours Sold (Se)
k. Renewable Energy Cost Adjustment Factor, ( i / j )