Resolution No. 2012-244 (2)CITY CLERK'S OFFICE
INTEROFFICE MEMORANDUM
DATE: February 5, 2013
TO: S. Kevin Wilson, Director of Community ServicesW
& Water
FROM: Deborah Juarez, Records Management Assistant
RE: Contract No. CS-0338 — Replacement of City Hall Chiller Unit
Transmitted. herewith are two duplicate originals of the contract referenced above, approved by the City
Council of the City of Vernon on December 18, 2012, through Resolution No. 2012-244.
If you have any questions, please let me know.
Thank you.
Enclosures
c: Contract No. CS-0338
Resolution No. 2012-244
Im�p• Y'Jo
RISK MANAGEMENT
INTER -DEPARTMENT MEMORANDUM
DATE: February 4, 2013
TO: Pin Chan, Project Engineer
FROM: Teresa McAllister
Human Resource Director--'
RE: Complete Thermal Services - City Hall Building Chiller
Replacement - Contract No. CS-0338
Please be advised that Complete Thermal Services has provided
acceptable insurance coverage including a Performance Bond as
well as .a Labor and Material Bond.
Complete Thermal services will remove and replace an existing
chiller unit located on the roof of the City Hall building.
TM/ja
D EC�T ZIE
JAM 2 3 D
CITYATTORNEY DEPT
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
TO: William J. Davis, Mayor
Nicholas George Rodriguez, City Attorney
Dana Reed, Acting City Clerk
FROM: Samuel Kevin Wilson, Director of Community Services & Water
DATE: January 22, 2013
SUBJECT: City Hall Building Chiller Replacement, Contract No. CS-0338
Enclosed are Contract No. CS-0338 documents, in triplicate. The Risk Management has approved
the insurance coverage from Complete Thermal Services, hic.
Please sign where indicated and return the documents to my office. Thank you.
SKW/pc
Enclosures
CITY OF VERNON
CALIFORNIA
CITY HALL BUILDING CHILLER REPLACEMENT
Contract No. CS-0338
Mandatory Job Walk Date: (Monday) November 26, 2012, 9:00 a.m.
Bid Opening Date: (Wednesday) December 5, 2012, 2:00 p.m.
COMMUNITY SERVICES & WATER DEPARTMENT
1 CITY OF VERNON
4305 SANTA FE AVENUE
VERNON, CA 90058
(323) 583-8811
TABLE OF CONTENTS
A.
C.
NOTICE INVITING SEALED PROPOSALS (BIDS)
INFORMATION FOR BIDDERS
1. General...................................
.......................................
.........
2. Contract Documents.....................................................................
3. License
4. Proposals.....................................................................
5. Contract and Bonds.....................................................................
6. Addenda..............................
Page
.................................... A-1
.................................... B-1
................... :................ B-1
.......................................... B-1
.......................................... B-1
.......................................... B-2
.......................................
7. Withdrawal of Bid..............................................................................
8. Award or Rejection of Bids........................................................................
9. Bidders Interested in More Than One Bid ..................................................
10. Insurance and Financial Requirements......................................................
11. Preliminary Estimate..............................................................................
12. Deductive Items..............................................................................
13. Mandatory Tour of the Site........................................................................
14. Project Description.....................................................................
15. Project Map.....................................................................
BID FORM PROPOSAL TO THE CITY OF VERNON
........................................... I�
........................................... B-5
1.
Proposal..................................................................................................................
C-1
2.
Bid Prices..................................................................................................................
C-2
3.
Materials..................................................................................................................
C4
4.
Subcontractors..................................................................................................................
C-5
5.
Deposit of Security..................................................................................................................
C-6
6.
Bonds..................................................................................................................
C-6
7.
Withdrawal..................................................................................................................
C-6
8.
Principals..................................................................................................................
C-6
9.
License and Signature..................................................................................................................
C-7
10.
Bidder's Qualifications..................................................................................................................
C-8
11.
Contractor's Acknowledgement of Insurance Requirements.........................................................
C-9
D. CONTRACT
Article1. GENERAL................................................................................................................... D-1
Section1. Scope of Work.................................................................................................................. D-1
Section2. Consideration................................................................................................................... D-1
Section3.
Payments..................................................................
Section 4.
Contract Documents...........................................................
Section 5.
Compliance with Provisions of Law ..................................
Section 6.
Costs and Attorney's Fees ..................................................
Section7.
Notices..................................................................
Section 8.
Conflict with Plans and Specifications ..............................
Section 9.
Assignment..................................................................
Section 10.
Paragraph Headings..........................................................
Section 11.
Authority of City's Representative ...................................
d
Page
Article 2. WAGES, HOURS AND WORKING CONDITIONS.................................................... D-3
Section 12. General Prevailing Wages and Livable Wages
.................................................................
Section13. Hours of Work
D-3
..................................................................................................................
Section14. Apprentices..................................................................................................................
D-3
Section15. Subcontractors
D-3
..................................................................................................................
Section16. Discrimination
D-3
..................................................................................................................
Section17. Safety...................................................................
D-4
Section 18. Character of Workers
........................................................................................................
D-4
Article 3. INSURANCE, INDEMNIFICATIONS AND BONDS
..................................................
D-4
Section 19. Insurance
.....................................................................................................
Section 20. Indemnification
............. D-4
.................................................................................................................
Section 21. Workers' Compensation
D-4
....................................................................... .............................
Section 22. Labor and Material Bond
D-5
..................................................................................................
Section23. Performance Bond
D-5
.............................................................................................................
D-5
Article4. PERFORMANCE.............................................................................................................
D-5
Section 24. Time for Completion ...................... ............................................................
....................... D-5
Section25. Force Majeure..................................................................................................................
D-5
Section26. Utility Relocation..............................................................................................................
D-5
Section27. Public Convenience
...........................................................................................................
Section28. Excavations
D-5
..................................................................................................................
Section29. Extra Work
D-6
..................................................................................................................
Section30. Clean-Up..................................................................................................................
D-6
Section31. Equipment..................................................................................................................
D-6
Section 32. Permits and Licenses
D-7
...................................:.....................................................................
Section 33. Land and Rights of Way....................................................:.................
D-7
............................
Section 34. Plans and Drawings...........................................................................................................
. D-7
Section 35. Shop Drawings Submitted by the Contractor....................................................................
D-8
D-8
Section 36. Supervision by the Contractor...........................................................................................
D-8
Section 37. Inspection of Work ..............................:................................ .............................................
D-9
Section 38. Correction of Defective and/or Unauthorized Work ........................................................
D-9
Section 39. Errors or Discrepancies Noted by Contractor
...................................................................
Section40. Equipment (Tools)...........................................................................................................
D-9
D-9
Article5. MISCELLANEOUS
.................... ..............: .............................................
.....D-10
Section41. Damages for Delay............................................................................................................
D 10
Section42. Guarantee
.......................................................................................6..........................
Section 43. Risk of Loss Prior to Final Acceptance.............................................................................
D-10
D-10
Section44. Termination
..................................................................................................................
Section 45. Standard Specifications
D I1
.....................................................................................................
D-12
R
Pape
E. BOND FORMS AND INSURANCE REOUIREMENTS...............................
:................................ E-1
Workers' Compensation Certificate............................................................. ........................................
E-2
PerformanceBond.......................................................... ......................................................
E-3
Laborand Material Bond................................................................................................................E-5
InsuranceSchedule . .................. .............................................................................................
E-7
DocumentationRequired...................................................... ..........................................................
E-7
Proof of Insurance, Approval as to Form..............................................................................................E-8
Sample Irrevocable Letter of Credit......................................................................................................E-9
F. SPECIAL PROVISIONS................................................................................................................F-1
I. GENERAL...............................................................................................................F-1
Standard Specifications................................................................
Examination of the Site...........................................................
Mobilization.........................................................
Construction Schedule ................................... I.......................
Construction Hours........................................................:..
Construction Activities Coordination ..........................................
Equipment Submittal and Lead Time .............................................
Equipment Storage Areas..........................................................
Public Convenience...........................................................
Private or Public Property Damage .................................................
Cleaning of the Site During Construction .......................................
Permits...........................................................
Best Management Practices(BMPs)...............................................
LumpSum Prices...........................................................
II. REMOVAL AND SALVAGE OF EXISTING CHILLER
III. FURNISHING AND INSTALLING A NEW CHILLER.,
.................................................. 1 -L
.................................................. F-2
.................................................. F-2
................................ I ................. F-3
.................................................. F-3
..................................... F-3
......F-3
10
NOTICE INVITING SEALED PROPOSALS (BIDS)
NOTICE IS HEREBY GIVEN that the City of Vernon, (hereinafter "City") invites and will receive
sealed proposals (bids) up to the hour of two (2) o'clock p.m. on Wednesday, December 5, 2012
(according to the clock in the City Clerk's office), for the furnishing to said City of all transportation,
equipment, materials, labor, supplies and services necessary for Contract No. CS-0338, City Hall Building
Chiller Replacement. Proposals (Bids) shall be submitted to:
City Clerk
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
At said time, the bids will be opened in public and announced at the offices of the City. Bids shall
conform to and be responsive to the requirements for Contract No. CS-0338 and must be accompanied by a
bid bond. The City Council of the City reserves the right to reject any and all bids. Copies of Contract No.
CS-0338 are on file and may be examined in the office of the City located at:
2012.
CommunityServices & Water Department
4305 Santa Fe Avenue
Vernon, CA 90058
Copies may be obtained from said office.
Dated at the office of the City Clerk of the City of Vernon, this day of
DANA REED, ACTING CITY CLERK
of the City of Vernon, California
- A-1 -
B. INFORMATION FOR BIDDERS
1. General
The work hereunder must be done in strict conformity with the plans and specifications adopted and
approved by the City for Contract No. CS-0338.
2. Contract Documents
(a) The Contract Documents shall consist of the following:
Notice Inviting Sealed Proposals (Bids)
Information for Bidders
Bid Form Proposal
Bid Bond
Contract
Performance Bond
Labor and Material Bond
Proof of Insurance
Workers' Compensation Certificate
Special Provisions
Detailed Plans and Specifications
Standard Specifications and Drawings
(b) All terms and conditions contained in the Contract Documents shall become a part of the Contract
entered into between the successful bidder and the City. The City Council of the City reserves the right to
reject any and all bids, and to waive any and all irregularities in any bids.
3. License
A bid submitted by a Contractor who is not licensed in accordance with the provisions of Division
III, Chapter 9, of the Business and Professions Code of the State of California will not be considered for
award.
4. Proposals
(a) Bids must be made in accordance with the following instructions:
(1) Bids shall be made on the Bid Form Proposal furnished by the City as a part of Contract No.
CS-0338. All bids shall be properly executed with the signatures of all signatories written in longhand. All
blank items shall be filled in. Numbers shall be spelled out and written in Arabic figures. If the words and
Arabic figures are different, the words shall be used and the Arabic figures disregarded. Erasures,
interlineations or other corrections shall be authenticated by affixing next to the mark or correction, or in the
margin immediately adjacent thereto, the initials of the signatory(ies) to the bid. If the unit price and the total
amount set forth by a bidder, for any item, are not in the Bid Form Proposal, the unit price alone shall be
considered as representing the bidder's intention, and the totals shall be corrected to conform thereto.
(2) Bidders must submit bids on all of the schedules set forth in the Bid Form Proposal.
(3) Bids shall not contain any recapitulation of the work to be done. Alternative proposals will
not be considered except as specified. Oral, telegraphic and/or telephonic proposals or modifications will not
be considered.
(4) Bids shall be accompanied by a cashier's check, a certified check, or bidder's bond in an
amount equal to 10% of the bid, made payable to or for the benefit of (as the case may be) the City of
Vernon. Said check or bond shall be given as a guarantee that the bidder will enter into Contract No.
- B-1 -
CS-0338 if awarded the work. The check of the bid bond may be forfeited to the City if the successful
bidder: (1) refuses or fails to execute the Contract within fifteen (15) working days after receipt of written
notice from the City that the Contract is ready for signature, or (2) refuses or fails to furnish the required
Contract bond and/or proof of insurance coverage within thirty (30) working days after the City has provided
written notice of award. If no bid is accepted by the City Council, or if the successful bidder executes and
delivers the necessary Contract Documents to the City, then the City will return all checks and bonds
received by it within ten (10) days after the execution of said Contract or within ten (10) days after being
requested to do so by the unsuccessful bidder.
(b) Before submitting a bid, bidders shall: read Contract No. CS-0338, especially the Special
Provisions, and all other Contract Documents with care; visit the site of the work, and; be fully informed
about all the existing conditions and limitations. The bidder should also be fully aware of the bond and
insurance requirements as to the successful bidder. The bid shall specify the amounts to cover the cost of all
items included in Contract No. CS-0338. No allowance will be made because a bidder failed to examine the
Contract Documents or obtain the requisite knowledge about the project prior to submitting its bid.
(c) Bids shall be sealed in an envelope marked:
Contract No. CS-0338, City Hall Building Chiller Replacement
Bids shall be addressed to the City Clerk of the City and shall bear the name of the bidder. Bids
shall be delivered to the City Clerk on or before the day and hour for the opening of bids as set in the Notice
Inviting Sealed Proposals (Bids). It is the SOLE responsibility of the bidder to see that the bid is delivered
and received before the scheduled closing time for receipt of bids. Any bid received after the scheduled
closing time shall be returned to the bidder unopened.
(d) The City shall have a period of sixty (60) days after the opening of the bids within which to accept or
reject any or all of the bids.
5. Contract and Bonds
(a) The form of Contract that the successful bidder, as the Contractor, will be required to execute is
included in the Contract Documents, and should be examined by the bidder with care. The Contract, bonds
and other documents to be executed by the Contractor shall be executed in original triplicate stamped
according to law. One original shall be filed with the City and the others with the appropriate City
departments.
(b) At the time the Contract is executed, the successful bidder will be required to furnish and maintain
the following: (1) a Labor and Material Bond in an amount equal to 100% of the Contract price and (2) a
faithful Performance Bond in an amount equal to 100% of the Contract price. The bonds shall be secured
from a surety company that the City finds acceptable. The surety's name must be on file with the County
Clerk of Los Angeles County and/or the California Department of Insurance as an approved and financially
sound surety company, authorized to transact business in this state.
The bonds shall meet all of the requirements and contain all of the conditions specified in Sections
3247 and 3248 inclusive, of the Civil Code, and other applicable provisions of the law and/or regulations of
the State of California.
(c) If the successful bidder fails to execute the Contract, file the required bonds, and/or file proof of
insurance coverage as required by the Contract Documents, the award of the Contract may be annulled by the
City and the bid bond forfeited.
6. Addenda
Any addenda issued before the time in which to submit bids expires, and included as a part of the
Contract Documents furnished to the bidder for preparation of its bid, shall be covered in the bid and shall be
a part of the Contract.
7. Withdrawal of Bid
Any bidder may withdraw its bid either personally or by a signed written request any time prior to
the scheduled time for opening of the bids (but not after).
8. Award or Rejection of Bids
The Contract will be awarded to the lowest responsible bidder complying with these instructions and
with the Notice Inviting Sealed Proposals (Bids) based upon the Grand Total amount of the bid. The City,
however, reserves the right to reject any and all bids or to waive any irregularities in bids received. If, in the
judgment of the City, a bid contains prices for the various items within the bid that appear to be
unrealistically low, or if the bidder is not considered responsible, the bid may be rejected.
9. Bidders Interested in More Than One Bid
No person, firm or corporation shall be allowed to make or file, or be interested in more than one bid
for the same work, unless alternative bids are permitted. A person, firm or corporation that has submitted a
subproposal to a bidder or quoted prices on material to a bidder, may submit a subproposal or quote prices to
other bidders.
10. Insurance and Financial Requirements
(a) Before entering into the Contract, the successful bidder shall furnish evidence that workers'
compensation insurance, public liability, property damage insurance, and all other insurance specified in the
insurance schedule set forth at pages E-7 and E-8 have been procured. The insurer must be an insurance
company admitted in and authorized to do business in California and maintain a rating that is acceptable to
the City. The insurance procured must be maintained in full force and effect for the entire duration of the
Contract.
(b) Before the Contract is awarded, any bidder upon request shall furnish a recent statement of said
bidder's financial condition and previous construction experience or such other evidence of the bidder's
qualifications, as may be required by the City. If not previously provided to the City, the successful bidder
shall fumish a recent statement of its financial condition and previous construction experience or such other
evidence of its qualifications before entering into the Contract.
11. Preliminary Estimate
The preliminary estimate of quantities of work to be done and material to be furnished, as shown in
the Contract Documents, are approximations and are given as a basis for the comparison of bids. The City
does not expressly, or by implication, agrees that the actual amount of work will correspond with the
preliminary estimates. The City reserves the right to increase or decrease the quantity of any item or portion
of the work or to omit portions of the work, as it deems necessary or expedient. The successful bidder shall
not at any time after the submission of the bid have any claim for damages as a result of lowering of
anticipated profits or the loss of profits because of any difference between the quantities of work actually
done and those stated in its bidding sheets.
Each bid item should be priced to carry its pro-rata share of the costs, overhead and profit. Bidders
are cautioned against unbalancing their bid by including more than a pro-rata share of overhead and profit in
any bid item.
B-3 -
12. Deductive Items
Attention should be paid to Deductive Bid Items. These items have been listed in the Bid Price
section of the Bid Form Proposal. All items will be totaled and included in the comparison of bids made by
the City. The City has the option of deducting the Deductive Bid Items from the total bid price prior to
awarding the Contract.
13. Mandatory Tour of the Site
A mandatory tour of the site of the proposed work has been set for Monday, November 26, 2012.
The mandatory tour will start at the office of the Community Services & Water Department, City
Hall, 4305 Santa Fe Avenue Vernon, California at: 9:00 a.m.
14. Project Description
Contract No. CS-0338 involves the chiller replacement at the City Hall building in the City of
Vernon, State of California.
The chiller replacement at the City Hall building shall consist of removal and salvage/disposal of
existing chiller, and furnish and install a new chiller according to the City special provisions. The salvage of
existing chiller shall be reflected in the cost of bid.
15. Project Map
Z
LJ
m
LLJ
g
�OD
lal M
Of M
W OI
N 0
J
U N
= O N
U Z ,
Z U }}N
.7. Z
m 0
J U
J
2
U ,
/ i/
rv6
w
�
L31tlNtlN
F
GN
F
tlAY3NIN
mn
zG�
�1
�
SSOL
rc
0
MH A3NMO0
S '1 'N
3NN3Atl
tl oltl
zz
a
�
i
nN3A
OS
o
3fIN3Atl
3uOB
5
�
a
0105
133tl1S OlOS
3ON Atl
31 s
'we OulOtld
z
i
a
�
N
3NN3Atl
3d
VD&S
w
�
�
0
- B-5 -
F
(n
U
W
O
a
C. BID FORM PROPOSAL TO THE CITY OF VERNON CALIFORNIA
1. Proposal
WORK TO BE PERFORMED: City Hall Building Chiller Replacement -Contract No. r 0 38
Name of Bidder: Complete Thermal Services Inc
Business Address: 11570 Seaboard Circle Stanton CA 90680
Phone Number: 714-891-2265
The site of the work to be performed and referred to herein is in the County of Los Angeles, California.
The work to be performed will be in accordance with the specifications and Contract Documents of Contract No.
CS-0338.
TO THE CITY COUNCIL OF THE CITY OF VERNON:
Pursuant to and in compliance with the Notice Inviting Sealed Proposals (Bids) and other documents relating
thereto, the undersigned bidder, having become familiar with the terms of the Contract, and the cost of the work at
the place where the work is to be done, hereby proposes and agrees to perform the Contract within 75 calendar
days (Lead time for a new chiller shall be included) after issuance of a "Notice to Proceed" or commencement of
work, whichever occurs first, including all of its component parts and everything required to be performed, and to
provide and furnish any and all of the labor, material, tools, expendable equipment, and all utility and transportation
services necessary in order to perform the Contract and complete in a workmanlike manner all of the work required
as specified in Contract No. CS-0338, all in strict conformity with the plans and specifications and other Contract
Documents, including Addenda N um ber _ and _ file in the office of the City Clerk.
The undersigned, as bidder, declares that the only persons or parties interested in this proposal as principals are
those named herein, and that this proposal is made without collusion with any person, firm or corporation. The
bidder proposes and agrees that if this proposal is accepted, the bidder will execute a Contract with the City that is
in substantially the same form as the Contract set forth in the Contract Documents.
C-1-
2. Bid Prices
The undersigned, as bidder, agrees that the bidder will accept in full payment thereof the following lump sum
prices, to wit:
Perform all the work as specified herein and shown in the Special Provisions of the City Hall Building
Chiller Replacement, Contract No. CS-0338.
The total bid price amount includes furnishing all labor, materials, equipment, mobilization, removal and
salvage/disposal of all equipment and apparatus, permits, fees, overhead, profit and taxes associated with the
Contract No. CS-0338 with all of the work complete in place and in working order per contract
specifications.
Item No. 1
Disconnect, remove, salvage and or dispose of the existing chiller and associated apparatus located on the
City Hall building roof (any salvage value of the existing chiller shall be reflected in this bid item no. 1),
complete in place, approximately I lump sum at:
Item No.2
Three Thousand One Hundred Sixty -Six and 00/100 lump sum
(words)
3 166 00 lump sum
(figures)
$ 3,166.00
(figures)
Furnish and install a new Trane 80-ton nominal air cooled packaged chiller unit, associated apparatus and
required connections on the City Hall building roof per Contract Specifications, complete in place and in
working order, approximately 1 lump sum at:
Seventy Thousand Eighty -Nine and 00/100 lump sum
(words)
$70 089 00 lump sum
(figures)
$ 70,089.00
(figures)
Furnish atotal of five (5)year manufacturers extended warranty on the four compressors and the chiller unit,
approximately 1 lump sum at:
Two Thousand and 00/100 lump sum
(words)
e2 000 00 lump sum
(figures)
$ 2,000 00
(figures)
C-2
Grand Total, Item Nos. 1 through 3 inclusive:
Seventy -Five Thousand Two Hundred Fifty -Five and 00/100
(words)
T75 255 00
(figures)
C-3
3. Materials
The name and address of the manufacturer for each type of material upon which this
proposal is based is as follows:
Trane — 800 E. Bealy St Davidson NC 28016
McDonnell Miller — ITT Controls P.O. Box 422 NLr3770 AK Barneveld Gelderland The Netherlands
Owens Corning — I Owens Corning Parkway Toledo OH 43659
Anvil — 2 Holland Way, Exeter NH 03833
Smith Cooper — 2867 Vail Ave. Commerce CA 90040
Republic Conduit— 7301 Logistics Drive, Louisville, KY 40258
Encore Wire Corp. — 1329 Millwood Road, McKinney, TX 75069
Eaton Cutler Hammer — 2050 Westport Center Dr., St. Louis, MO 63146
USK Forged — B-410 New Friends Colony, New Delhi 110 025, India
Hyundai — 1400 Broadfield Blvd., Houston, TX 77084
Steel City Kindorf— 8155 T&B Blvd., Memphis, TN 38125
C-4
4. Subcontractors
The bidder as general contractor hereby identifies the subcontractors on the job for each particular
trade or subdivision of the work with each firm name and principal location of the mill, shop or office when
the value of the work, labor or service performed is in excess of one-half of one percent of the total bid. The
bidder agrees that there shall be no substitution of subcontracting except upon compliance with the
"Subletting and Subcontractors Fair Practices Act" (Public Contract Code Sections 4100, et M.).
(Instruction: List only one subcontractor for each such portion.)
DIVISION OF WORK OR NAME OF FIRM OR PRINCIPAL LOCATION
TRADE CORPORATION
Pipefitting and Welding Quinn Construction
Bellflower. CA
Electrical D B Electric Canoga Park, CA
Crane Service Crainco Whittier, CA
Scrap and Salvage Service Fred and Sons Montebello, CA
C-5
5. Deposit of Security
ACCOMPANYING THIS PROPOSAL is Bidder's Bond (insert the
words "Cashier's Check", "Certified Check", or "Bidder's Bond") in an amount equal to five percent (5%) of
the total of the bid, payable to or for the benefit of the City (as the case may be).
The undersigned deposits the required security as a bid proposal guarantee and agrees that it shall be
forfeited to the City as liquidated damages in case this bid proposal is accepted by the City, and the
undersigned fails to execute the Contract.
6. Bonds
The undersigned agrees to provide the City with a Performance Bond and Labor and Material Bond
in the form set forth in the Contract Documents within seven (7) working days after the date of mailing of
the acceptance. The surety will be one that the City finds acceptable.
Withdrawal
The bidder acknowledges that it may withdraw its bid either personally or by a signed written
request any time prior to the scheduled time for opening of the bids. Once the bids are opened, the bidder
agrees that its bid will not be withdrawn for a period of sixty (60) days after the time set for the opening
thereof.
8. Principals
The names of all persons interested in this Bid Proposal as principals are as follows:
Clements
C-6
9. License and Signature
Theundersigned is licensed in accordance with California Business and Professions Code, License
No. 805151
Name of bidder: Complete Thermal Services Inc
11570 Seaboard Circle
Stanton CA 9061
Signature of bidder:
Title: _President/Secretary. V.P./Treasurer
Dated: December 4 2012
NOTE: The complete and proper legal name of the bidder shall be set forth above. If the bidder is a
corporation, two signatures are required, as follows: (1) the chairman of the board, the president, or any vice-
president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any
assistant treasurer. If the bidder is a limited liability company, signatures are required of two members or
managers unless otherwise provided in the company's articles of organization. If the bidder is a partnership,
signatures are required of the partner or partners authorized to sign contracts on behalf of the partnership.
C-7
10. Bidder's Qualifications
The Bidder must have aminimum offive (5)years of experience as an ongoing business enterprise
in the specific type of work indicated in the proposal.
The following contracts which show experience inwork of similar scope to that covered in the
proposal and which have been satisfactorily completed inthe past five (5) years are:
CONTRACT
YEAR NAME OF FIRM AND ENGINEER LOCATION AMOUNT
2011
Toyota Sports Center / Brad Sholl
El Segundo, CA
$326,687.00
2008
Westfield Shopping Town / Karen Cohen
Sherman Oaks, CA
$92,885.00
2012
Arden Realty / Daniel Walker
Orange, CA
$41,850.00
2011
Jon Donaire Desserts / Randy Noland
Santa Fe Springs, CA
$171,101,00
2007
Simply Fresh Fruit / Jack Potter
Vernon, CA
$53,960.00
2011
RP Constructors / John Basso
Downey, CA
$192,916.00
2010
Jon Donaire Desserts / Dick Paschke
Santa Fe Springs, CA
$64,541.00
The Bidder, as a contractor, has never failed to satisfactorily complete an awarded
as follows:
contract, except
None
Ideclare under penalty of perjury, under the laws of the State of California, that the foregoing is
true and correct. Executed Stanton CA on this 4th day of December 2012
Name: William L. Clements
to
11. Contractor's Acknowledeement of Insurance Reauirements.
The Contractor acknowledges that the Insurance Schedule contained in section "E" has been
reviewed, that a copy thereof has been submitted to an authorized insurance agent or broker, and that the
proof of insurance required therein will be submitted within thirty (30) days after notification of the
acceptance of the Contractor's bid.
The Contractor understands that the Contract will not be executed by the City until all proof of
insurance have been received and approved as to form by the City Attorney.
The Contractor agrees that failure to submit the required proof of insurance within said thirty (30)
days shall constitute grounds at the City's discretion for awarding the Contract to the next lowest bidder and
for forfeiting the Contractor's bid bond.
Date: Dec. 4, 2012
Contractor
Name: Complete
]j Thermal Services, Inc
Signature:
Title: President
C-9
12/05/12 09: 35AM 5624964317 _ P.01
C15A 12/5/2012 11:10:00 AM PAGE 1/001 Fax Server
OD1
Western Surety Company
BID BOND
(Percentage)
Bond Number: 71 "s3 795
KNOW ALL PERSONS BY THESE PRESENTS, That we
of
11570 Seaboard Ci,rcl.e, Stan Con, CA 93680 ,hereinafter
referred to as the Principal, and W stern_s,lrety Cnn' any
as Surety, are held and firmly bound unto city of Vernon
of 4305 Santa 'e Avenue, Vernon, C.A 90058
hereinafter referred to as the Obligee, In the sum ofFi V e ( - %) percent of the greatest
amount bid, for the payment of which we bind ourselves, our legal representatives, successors and assigns
jointly and severally, firmly by these presents.
WHEREAS, Principal has submitted or is about to submit a proposal to Obligee on a contract for
Ch,illar Reol.acemant _- 4305 Santa Fe, city nif Vernon, CA 97058
NOW, THEREFORE, if the said contract be awarded to Principal and Principal shall, within such time as may be
specified, enter into the contract in writing and give such bond or bonds as may be specified in the bidding or
contract documents with surety acceptable to Obligee; or if Principal shall fail to do so, pay to Obligee the
damages which Obligee may suffer by reason of such failure not exceeding the penalty of this bond, then this
obligation shall be void, otherwise to remain in full force and effect.
SIGNED, SEALED AND DATED this 5 t h day of December 2012
Com LeC=. T.Ierinal re._vices, Inc.
(Principal)BY C.L CLIP aC._ C'- -
tde�s t'::•.rn .C,�reC• is om >:.vn
MAIIRF:RN 31AF.TT.A PMSHRR Attorney -in -Fact
Farm F5076
Received Time Dec. 5. 2012 10:39AM No, 0155
❑ acknowledgment of Principal
® Acknowledgment of Surety (Attorney -in -Fact)
STATE OF CALIFOR.NTA
88
COUNTY OF-_ �Lco,,(s Angeles "hem
On �r�� _ — I .._. before m e, invert name and title of the officer
ptrsuually appeared—- MAUP2EN SHEILA MOSHER
namr.(s")nf eignero) ._.
Who proved to me on the basis of satisfactory evidence to be tho person(s) whose name(s) is/are subscribed
to the within instrument and acknowledged to me that lie/slre/they executed the same in his/her/their
authorized capacitv(ies), and that by his/her/their signature(s) on the instrument the person(s), or the
entity upon behalf of which the permn(s) acted, oxecuted the instrument,
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and c,orm t,
WITNES ny hand and official seal.
Signature
(The balance of this page is Intentionally left blank.)
Western Surety Company
POWER Or ATTORNEY - CERTIFIED COPY
Bond No. 71353795
Know All Men By These Presents, that WESTERN SURETY COMPANY, a corporation duly organized and existing under the laws
of the State of South Dakota, and laving its principal oliwo in Sioux Falls, South Dakota (the "Company"), does by th000 presents make:
constitute and appoint MAUREEN _..u_ X1jA HQ$E1U._.
its true and lawful attorney(s)-in•£act, Kith fill power and authority hereby conferred, to execute, acknowledge and deliver for and onitt
behalf as Surety, bonds for:
Principal: Camplett- ^he.rmal Services, Inc..
Obligee: City of Vernon
Amason; $500,000.00
and to bind the Company thereby as frilly and to the. same extent as if such bunch were signed by the Senior Vice President, sealed with
the corporate seal of the Company and duly attested by its Secretary, hereby ratiPong and confii-ming all that the said atmmey(s)-iu-fact
may do within the above stated limitations. Said appointment is made under curd by authority of the following bylaw of Western Surety
Company which remains in frill force and effect.
"Section 1. All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall bo oxcouted in the
corporate name of the Coarpatky by the President, Secretary, euoy Assistant Secretary, Treasurer, or any Vice President or by such other
offioors as the Board of Directors may authorize. The President•, soy Vice President, Secretary, any Assistant Secretary, or the Treasurer
may appoint Attorneys in Pact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company.
The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the
corporation. The signataere of any such olrirer andthe corporate seal may he print.e.diby facsimile"
All authority hereby conferred shall expire and terminate, without notice, unless used before midnight, of _ __ t11a rch 5
201 3 , but until such time shall be irrevocable and in full force iced effect.
In Witness Whereof Western Surety Company has caused these presents to be signed by its Vice President, Paul T. Brutlat, and its
corporate r hjgtj xedthis Sth day of__....n cvrrit-c 201.2 .
.r .....-
`4; a n - WEST R SURE COMPANY
, r
Alta€: _ tom_
: i •e Paul T. ru[IaL, Vice President
eTi�.'•.
t�lh&Q�1i•d'1'A
COUNt 4
On this StPr day of DecetrLer iu Lhe yew ' __ __4 S11= , before me, a uuLacy public, pet•smally appeared
Paul T. Bruilet, who being to ene duly sworn, acknowledged that lie signed the above Power. of Attorney as the aforesaid officer of
WTSTERN SURETY COMPANY and acknowledged said instrument to be the voluntary act and die (said co at on.
♦ir4hMWWiveM�K�r\NAM♦
S. PETRIK
�F L HUTARY PUBLIC otary Public - 9uuth Dakota
SoUTH DM(OrA
�4•wMi�•.1r444\1,4�\•4h�Y �
My Commission Expires August 11, 2016
I the undersigned officer of Western Surety -Company, a Awk corporation of the SLute of South Dnl<ota, do hcrnhy certify chat the
attached Pnwer of Attorney, is in full force and effect and is irrevocable., and furthermore, that Seeien 1 of the bylaws of the Company as
set. fnrt.h in the Pnwer of Attorney iv now in fine -
In Lestirnouy whereof, I have hereunto set sty hand and seal of Western Surety Company this ti t.h day of
Decenioer �C712.,.__,
«'EST R SURE COMPANY
r�
D. CONTRACT
THIS CONTRACT FOR, City Hall Building Chiller Replacement Contract No CS-0338 is
made, entered into, and executed in triplicate in the City of Vernon, California, as of the
_day of , 2012.
BY AND BETWEEN CITY OF VERNON, a municipal corporation
hereinafter referred/to as "City"
AND COwvrz e TA2Y cis/ Ulz �5 zUc .
//�7o S oaici C1r C'_
referred to as "Contractor".
IN CONSIDERATION OF THE MUTUAL PROMISES, COVENANTS AND CONDITIONS
HEREIN SET FORTH, THE PARTIES DO HEREBY AGREE AS FOLLOWS:
Article 1. GENERAL
Section 1. Scope of Work
The Contractor will furnish all labor, equipment and materials and will perform all work described in
the Contract Documents attached hereto and hereby incorporated by reference.
Section 2. Consideration
The City shall pay the Contractor for the performance of the work hereunder in accordance with the
amounts set forth in Bid Form Proposal attached hereto and hereby incorporated by reference and in an
amount not to exceed $ 7!Z 2 55-, 00
Section 3. Payments
(a) Monthly Progress Payments
On or about the 25th day of each month, the Contractor shall submit to the City an application for its
monthly progress payment. The application shall contain an estimate of the amount and value of all the work
performed by the Contractor since the date of its last progress payment application. The City's
Representative shall perform a quantity validation prior to approving the monthly progress payment.
The City shall pay the Contractor, the amount of the approved monthly progress payment, less 5%
retention. The monthly progress payment may also be reduced by the following: (1) amounts due to the City
for equipment; services or materials furnished by the City in connection with work done on the project; (2)
amounts of any claims or liens, and (3) amounts required to be deducted by Federal, State or local
governmental authorities. Payment shall be made within thirty (30) working days of City's approval of the
Contractor's monthly progress payment application.
No monthly payment shall be construed as acceptance of the work, or any portion thereof, nor shall
such payment preclude the City from demanding and recovering from the Contractor such damages as may
be sustained by reason of the Contractor's failure to fully perform under the Contract.
(b) Final Progress Payment
(. Upon satisfactory completion of the work described herein, the Contractor shall furnish the City with
a complete and final accounting of all labor, materials, and other costs. The City shall pay the Contractor
according to the payment terms set forth in Section 3(a).
- D-1 -
(c) Payment of the Retention
Payment of the retention shall be made thirty-five (35) working days after the recordation of a Notice
of Completion by the City or if a Notice of Completion is not recorded sixty-five (65) working days after
acceptance of the completed project. The acceptance will be made only by an action of the City Council of
the City. Acceptance of payment of the retention by the Contractor shall constitute a waiver of all claims
against the City arising under this Contract.
Section4. Contract Documents
The complete Contract includes the Contract Documents set forth herein, including: (1) Notice
Inviting Sealed Proposal (Bids), (2) Information for Bidders, (3) Bid Form Proposal, (4) Contract, (5)
Performance Bond, Labor and Material Bond, Proof of Insurance, Workers' Compensation Certificate, (6)
the Special Provisions, (7) detailed Plans and Specifications, (8) Standard Specifications and Drawings, and
(9) any addenda.
Section 5. Compliance with Provisions of Law
The Contractor shall comply with all applicable provisions of law whether Federal, State, or local
relating to its performance under the Contract.
Section 6. Costs and Attorney's Fees
In any action or proceeding brought to enforce the provisions of this Contract, the court shall award
reasonable costs and expenses, including reasonable attorney's fees, to the prevailing party.
Section 7. Notices
Any notice required or permitted hereunder shall be given by personal delivery or by first class mail,
postage prepaid,
To: Contractor
��� ��'V'Jt�C c�J1GES, ..�i�.�•
To: City Clerk
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
Section 8. Conflict with Plans and Specifications
Any conflict between the plans and specifications and this Contract shall be brought to the attention
of the City's Representative for resolution.
Section 9. Assignment
The Contractor shall not assign the Contract or the payments due under the Contract.
Section 10. Paragraph Headings
The paragraph headings herein are for the convenience of the parties and shall not affect the
interpretation of the Contract.
Section 11. Authority of the City's Representative
The City's Representative shall decide all questions which may arise regarding the quality and/or
acceptability of materials furnished, the manner and/or acceptance of the Contractor's performance, the rate
of progress, and the interpretation of the plans and specifications.
Article 2. WAGES, HOURS and WORKING CONDITIONS
Section 12. General Prevailing and Livable Wages
The Contractor agrees that it, or any subcontractor working under it, will not pay less than the
prevailing rates of wages to all workers employed in the execution of this Contract. The Contractor will post
one copy of the established prevailing rates of wages at the job site. For each working day or portion thereof,
and for each workman paid less than the stipulated prevailing rates for such work or craft in which the
workman is employed or any work done hereunder by him, or by subcontractor under him, the Contractor
shall forfeit as a penalty to the City the sum of $50.00.
In addition employers shall pay qualifying employees a wage of no less than $10.30 per hour with
health benefits, or $11.55 per hour without health benefits.
Employers shall provide qualifying employees at least twelve compensated days off per year for sick
leave, vacation, or personal necessity and an additional ten days a year of uncompensated time for sick leave.
There is hereby a prohibition on employer retaliation against employees complaining to the City with
regard to the employer's compliance with the living wage ordinance. Employees may bring an action in
Superior Court against an employer for back pay, treble damages for willful violations, and attorney's fees,
or to compel City officials to terminate the services contract of violating employers.
Section 13. Hours of Work
(a) The time of service of any worker employed on the Contract is limited to eight hours during
a working day and forty hours during a calendar week. If an employee works in excess of the foregoing
hours, the employee will be compensated at a rate of one and one-half times their basic rate of pay.
(b) The Contractor shall keep and make available until ninety (90) working days after
completion of this Contract Agreement an accurate record showing the name of and actual hours worked
each working day and each calendar week by each worker employed by him on the work hereunder.
(c) The Contractor shall, as a penalty, forfeit to the City $50.00 for each worker employed on
the work by the Contractor or by any subcontractor for each working day during which such worker is
required or permitted to work more than eight hours a working day or forty hours in one calendar week.
Section 14. Apnrentices
The Contractor is responsible for complying with the provisions of Labor Code Section 1777.5
dealing with the employment of apprentices on the job site.
Section 15. Subcontractors
(a) The Contractor shall comply with the provisions of the "Subletting and Subcontracting Fair
Practices Act" contained in Public Contract Code Sections 4100, et s
D-3 -
(b) The Contractor shall submit to the City the following information:
(1) The name and location of the place of business of each subcontractor who will
perform work or labor or render services to the Contractor hereunder, or a subcontractor licensed by the State
of California, who, under subcontract to the Contractor, specially fabricates and installs a portion of the work
or improvement according to detailed drawings contained in the plans and specifications, in an amount in
excess of one-half of one percent of the Contractor's total bid.
(2) The portion of the work to be done by each subcontractor identified in Section
15(b)(1).
(c) The Contractor shall list only one subcontractor for each portion of work as defined by the
Contractor in its bid.
Section 16. Discrimination
The Contractor shall not refuse to employ or promote any person, shall not discriminate against any
person with respect to compensation received or terms and conditions of employment, and shall not
discipline or discharge any person in its employment because of the person's race, religion, creed, color, age,
national origin, ancestry or sex. In addition, the Contractor shall not refuse to accept otherwise qualified
employees as indentured apprentices solely on the grounds of race, religion, creed, color, national origin,
ancestry or sex.
Section 17. Safety
The Contractor and all subcontractors shall comply with the provisions of the Safety and Health
Regulations for Construction, promulgated by the U.S. Secretary of Labor under Section 107 of the "Contract
Work Hours and Safety Standards Act", as set forth in Title 29, C.F.R. and by the State of California,
Division of Industrial Safety.
Section 18. Character of Workers
.Only competent workers shall be employed to work on the Contract. Any person employed, who is
found to be incompetent, intemperate, troublesome, disorderly or otherwise objectionable, or who fails or
refuses to perform his work properly and acceptably, shall be immediately removed from the work by the
Contractor and shall not be re -hired to perform work on the contract.
Article 3. INSURANCE, INDEMNIFICATION and BONDS
Section 19. Insurance
The Contractor shall provide the City with proof of insurance naming the City, its consultants and
each of its directors, officers, agents, and employees as additional -named insureds on a policy or policies of
insurance providing and maintaining the coverages set forth in the Insurance Schedule contained herein.
Said coverage is not required for the active negligence of the City to the extent that indemnification for the
City's active negligence would be invalid under Section 2782(b) of the California Civil Code. The proof of
insurance shall also provide that said policy or policies are not to be canceled or materially reduced without
giving the City at least 30 days written notice.
Section 20. Indemnification
The Contractor shall indemnify, protect, defend, and hold harmless the City, its consultants and each
of its directors, officers, agents, and employees from and against any and all claims, demands, losses,
damages, liabilities, fines, charges, penalties, orders, judgments, and all costs and expenses incurred in
connection therewith, including reasonable attorneys' fees and costs of defense arising, directly or indirectly,
- D-4 -
in whole or in part, out of the services performed under this Contract, except to the extent arising from or
caused by the sole active negligence or willful misconduct of the City, its officers, agents, or employees.
Section 21. Workers' Compensation
The Contractor shall secure payment of compensation to Contractor's employees pursuant to Labor
Code Section 3700, and shall obtain employers' liability insurance as set forth in the Insurance Schedule.
Prior to commencing work hereunder, the Contractor shall submit to the City the Workers' Compensation
Certificate or an executed certificate of workers' compensation insurance as provided herein. Such insurance
shall include a waiver of subrogation endorsement naming the City, and its consultants, and each of its
directors, officers, agents, and employees.
Section 22. Labor and Material Bond
The Contractor shall execute and deliver to the City for its approval and acceptance a Labor and
Material Bond in an amount equal to the total amount payable under the terms of this Contract. Said bond
shall be payable by surety or sureties to the City in the event the Contractor fails to pay its subcontractors for
labor and material used in this project. Said bond shall be in substantially the same form as that attached
hereto. The surety will be one that the City finds acceptable.
Section 23. Performance Bond
The Contractor shall execute and deliver to the city for its approval and acceptance a Performance
Bond in an amount equal to the total amount payable under the terms of this Contract. Said bond shall be
payable by surety or sureties to the City in the event the Contractor fails to fully perform under this Contract.
Said bond shall be in substantially the same form as that attached hereto. The surety will be one that the City
finds acceptable.
Article 4. PERFORMANCE
Section 24. Time for Completion
The work shall be completed in the number of calendar days specified in the Bid Form Proposal.
Section 25. Force Madeure
Neither Party shall be considered to be in default in any of its obligations under this Agreement when
a failure of performance shall be due to an uncontrollable force. The term "uncontrollable force" shall mean
any cause beyond the control of the party affected, including, but not restricted to, flood, earthquake, storm,
fire, lightening, epidemic, war, riot, civil disturbance or disobedience, sabotage, or embargoes of the United
States Government or any other government, which by exercise of due diligence such party could not
reasonably have been expected to avoid and by exercise of due diligence has been unable to overcome.
Either party rendered unable to fulfill any of its obligations under this Agreement by reason of an
uncontrollable force, shall give written notice within five (5) business days of such fact to the other party and
shall exercise due diligence to remove such inability with all reasonable dispatch.
Section 26. Utility Relocation
Section 26 is not applicable to this project.
Section 27. Public Convenience
(a) The Contractor's operation shall not unnecessarily cause any public and city staff
inconvenience. The access rights of the public shall be considered at all times.
- D-5 -
Section 28. Excavations
Section 28 is not applicable to this project.
Section 29. Extra Work
(a) The City may require changes in, additions to, or deductions from the work to be performed
or to the materials to be furnished hereunder. No extra work shall be performed or change or addition made
without a written order from the City. The written order shall state that the extra work, change or addition is
authorized by the City, identify the work that is to be done and method to be used to accomplish the work,
and set forth the basis upon which payment is to be made. Nothing in this article shall excuse the Contractor
from proceeding with the prosecution of the work so changed. The Contractor shall, when required by the
City, furnish an itemized breakdown of the quantities and prices used in computing the amount of any
change or addition that might be ordered. The adjustment, if any, in the amount to be paid to the Contractor
by reason of any such change, addition or deduction shall be determined by one of the following methods:
(1) A lump sum or unit prices proposal from the Contractor.
(3) By proceeding with the work and furnishing daily reports of extra work by the close of the
next working day. Failure to submit the daily report in a timely manner may waive the
Contractor's right to compensation for that day. An attempt shall be made to reconcile the
report daily, and it shall be signed by the City's Engineer or his designee. The daily report
shall itemize the costs for labor, materials, and equipment rental. Reported labor costs shall
include the names and classifications of the workers, the hours worked, and the rates of pay.
Reported equipment costs shall include the type of equipment used, the identification
number, the hours of operation, and hourly rate. All records and reports shall be made
immediately available to the City's Representative.
(b) Mat'kuk
This section shall modify and replace "Section 3-3.2.3, Markup" of the Standard Specifications for
Public Works Construction.
(1) Work by Contractor. The following percentages shall be added to the Contractor's costs and
shall constitute the markup for all overhead and profits:
a)
Labor ......................20%
b)
Materials ......................15%
c)
Equipment Rental .....................15%
d)
Other Items and Expenditures ............15%
To the sum of the costs and markups provided for in this subsection, 1 percent shall be added
as compensation for bonding.
(2) Work by Subcontractor. When all or any part of the extra work is performed by a
Subcontractor, the markup established in (1) shall be applied to the Subcontractor's actual
cost of such work. A markup of 10 percent on the first $5,000 of the subcontracted portion of
the extra work and a markup of 5 percent on work added in excess of $5,000 of the
subcontracted portion of the extra work may be added by the contractor.
Section 30. Clean Up
Upon completion of the work, the Contractor shall remove all debris and surplus materials from the
work site.
- D-6 -
Section 31. Equipment
(a) New Equipment
Unless otherwise specified, shown, or permitted by the City all equipment incorporated in the work
shall be new and of current manufacture. The City may request that the Contractor furnish manufacturer's
certificates indicating the quality of the equipment. No equipment shall be installed until approved by the
City's Representative.
(b) Inspection of Equipment
All equipment furnished hereunder shall be subject to inspection and testing by the City's authorized
agents at the City's expense. In the event that such inspection and testing reveals equipment that does not
comply with the Contract documents, the Contractor shall bear the cost of necessary corrective measures as
well as the cost of subsequent inspection and testing.
(c) Defective Equipment
The inspection under Section 31(b) shall not relieve the Contractor of any of its obligations under the
Contract. Even though equipment required to be provided has been inspected, accepted, and included in a
monthly pay application, the Contractor shall, at Contractor's expense, replace or repair any such equipment
found to be defective or otherwise non -compliant with the Contract documents up through the guarantee
period in Section 42.
(d) Storage of Equipment
All equipment for use in the work shall be stored by the Contractor in such a manner as to prevent
damage from exposure to the elements, from admixture of foreign materials or from any other cause. The
Contractor shall be solely responsible for damage or loss of equipment caused by exposure, weather or other
causes.
Section 32. Permits and Licenses
(a) The Contractor shall apply for and procure all permits and licenses necessary for the work
except:
Building Permits from City of Vernon.
(b) The Contractor shall provide all notices necessary and incidental to the lawful prosecution of
the work and shall comply with the terms and conditions of all permits and licenses.
(c) The Contractor shall pay all charges and fees in connection with all permits and licenses
except those required by the following:
Building Permits from City of Vernon.
Section 33. Land and Rights of Way
Section 33 is not applicable to this project.
- D-7 -
Section 34. Plans and Drawings
(a) The approved plans may be supplemented by working drawings as are necessary to monitor
the work. All drawings shall be consistent with the Contract Documents. All such drawings delivered to the
Contractor shall be deemed written instructions to the Contractor.
(b) The City will furnish the Contractor with copies of all drawings and specifications
reasonably necessary for the execution of the work, at no charge. The Contractor shall keep one set of
drawings and specifications in good order at the job site and make them available to the City's
Representative and to the Contractor's Representatives.
(c) - The drawings and/or plans will show conditions as the City believes them to exist; but it is
not intended or to be inferred that the conditions as shown thereon constitute a representation by the City that
such conditions are existent. The City shall not be liable for any loss sustained by the Contractor as a result
of any variance of the conditions as shown on the drawings and/or plans and the actual conditions revealed
during the progress of the work, or otherwise.
Section 35. Shop Drawings Submitted by the Contractor
(a) No portion of the work requiring a shop drawing submittal shall be commenced until the
submittal has been reviewed by the City and returned to the Contractor with a notation that the City has
completed its review of the shop drawing. Shop drawings are drawings, diagrams, illustrations, schedules,
performance charts, brochures and other data which are prepared by the Contractor or any subcontractor,
manufacturer, supplier or distributor, and which illustrate some portion of the material or work.
(b) The Contractor shall review, approve, and submit for review by the City's Representative
shop drawings for material and equipment to be incorporated into the work. Four copies of shop drawings
shall be submitted to the City with a letter of transmittal listing the drawings submitted. Drawings shall
show the name of the project, the name of the Contractor, and the names of suppliers, manufacturers, and
subcontractors, if any. Shop drawings shall be submitted with promptness and in orderly sequence so as to
cause no delay in progress of the work.
(c) Shop drawings shall be complete. If the shop drawings show any deviation from the
requirements of the plans and specification because of standard shop practices or other reasons, the
deviations and the reasons therefore shall be set forth in the letter of transmittal.
(d) By approving and submitting shop drawings, the Contractor represents that material,
equipment and other work shown thereon conforms to the plans and specifications except for any deviation
identified in the letter of transmittal.
(e) Within ten (10) calendar days after receipt of the shop drawings, the City will return two
prints of the drawings to the Contractor along with its comments. The Contractor shall resubmit corrected
drawings, if the City has so requested. Resubmitted shop drawings shall be processed in the same manner as
the original submittals. The Contractor's letter of transmittal accompanying its resubmitted shop drawings
shall highlight the revisions requested by the City.
(f) The City's Representative will review the shop drawings only for general conformance with
the design concept of the project and general compliance with the plans and specifications. The City's
review of the shop drawings shall not be construed as relieving the Contractor of its responsibilities under the
Contract, including but not limited to: (1) providing material and equipment; (2) ensuring the proper fitting
and construction of the pipeline; (3) submitting accurate and complete shop drawings; (4) selecting proper
fabrication processes and techniques; and (5) performing the work in a safe manner.
Section 36. Supervision by the Contractor
The Contractor shall have a designated representative or alternative representative present at the
- D-8 -
worksite whenever work is in progress. The Contractor's designated representative or alternate
representative shall have authority to act for the Contractor. Before starting the work, the Contractor shall
inform the City, in writing, of the name of its designated representative. An alternate representative may also
be designated. Any communication between the City and the Contractor's Representative shall be deemed as
a communication to the Contractor. If the Contractor fails to have a designated representative present at the
worksite; the City's Representative may give necessary direction or instruction to the superintendent or
foreman having charge of the specific work to which the direction or instruction applies. The superintendent
or foreman shall comply with the direction or instruction promptly and shall relay the City's communication
to the Contractor or its designated representative.
Section 37. Inspection of Work
(a) The City shall have access to the worksite at all times to review and/or inspect the progress
of the work, the workmanship and the material being used.
(b) Whenever the Contractor changes its hours of operation, notice shall be approved by the
City's Representative one week prior to institution of the change. Any work done in the absence of the City's
Representative may be subject to rejection, at the City's discretion.
(c) Inspection of the work by the City's Representative shall not relieve the Contractor of the
obligation to fulfill the Contract. Defective work shall be corrected, notwithstanding the fact that the City's
Representative may have previously accepted the defective work.
Section 38. Correction of Defective and/or Unauthorized Work
(a) All work that has been rejected shall be corrected, or removed and replaced by the
Contractor, at the City's direction. Any remedial work will be done in a manner acceptable to the City. The
Contractor shall pay the remediation and/or removal and replacement costs. The Contractor must obtain
written authorization to perform extra or unauthorized work prior to undertaking such work. The Contractor
will not be compensated for any unauthorized work. In addition, the City may order the Contractor to
remove, at the Contractor's expense, any extra or unauthorized work.
(b) The Contractor must comply promptly with any order made by the City under the provisions
of this article. If the Contractor fails to comply with the City's orders, the City may in its discretion cause
defective work to be corrected by its own forces or by another contractor. The amount that the City paid to
correct the defective work will be deducted from any monies due or to become due to the Contractor.
Section 39. Errors or Discrepancies Noted by the Contractor
(a) If the Contractor, either before commencing work or in the course of the work, finds any
discrepancy between the contract, especially the plans, and specifications, or between any of them and the
physical conditions at the worksite, or finds any error or omission in any of the plans, and specification's, or
in any survey, the Contractor shall promptly notify the City in writing of such discrepancy, error, or
omission. If the Contractor observes that any plans, specifications, or drawings are at variance with any
applicable law, ordinance, regulation, order or decree, Contractor shall promptly notify the City in writing of
such deviation or conflict.
(b) The City, upon receipt of such notice, shall promptly investigate the circumstances and give
appropriate instruction to the Contractor consistent with Section 29. Until such instruction is given by the
City Engineer, any work done by the Contractor, either directly or indirectly after its discovery of such error,
discrepancy, omission, deviation or conflict, will be at the Contractor's own risk. The Contractor shall bear
all costs arising from any work that incorporates such error, discrepancy, omission, deviation or conflict.
Section 40. Equipment (Tools)
The Contractor shall furnish equipment/tools and facilities to perform the work to the industry
D 9
standard in accordance with the specifications. Such equipment and facilities must be in a good state of
repair, be maintained in such state during the progress of the work, and shall meet all requirements of
applicable ordinances and laws. No worn or obsolete equipment/tools shall be used, and in no case shall the
manufacturer's rating of capacity for any equipment/tools be exceeded.
Article 5. MISCELLANEOUS
Section 41. Damages for Delay
(a) The Contractor acknowledges the City's desire that the project be completed on or before the
date specified in the Contract. The Contractor also acknowledges that if its work is not completed on or
before said date, the City will incur 'substantial damages that cannot be ascertained at this time. Accordingly,
the Contractor shall pay to the City any and all damages caused by the Contractor's delay in completing the
work under the Contract.
(b) If the work is not completed in accordance with the foregoing, it is mutually agreed that the
City will suffer damage, that it will be impractical and unfeasible to determine the amount of actual damage.
Therefore, the Contractor will pay the City, as fixed and liquidated damages and not as a penalty, the sum of
$1,500.00, for each and every working day of delay, and that the Contractor and its Surety will be liable
for the amount thereof. The Contractor, however, will not be charged liquidated damages because of any
delays in the completion of the work due to Force Majeure or acts of the City, acts of another Contractor in
the performance of a Contract with the City, and without the fault or negligence of the Contractor.
(c) The Contractor shall within ten (10) days from the beginning of any such delay (unless the
City grants a further period of time prior to the date of final settlement of the Contract) notify the City in
writing of the cause of delay. Upon notification of a delay, the City shall ascertain the facts and extent of the
delay and extend the time for completing the work if in its sole discretion its findings justify such an
extension. The City's findings shall be final and conclusive on the parties hereto.
(d) The City shall have the right to extend the time for completion if it determines such
extension to be in the City's best interest. If the City extends the time limit for completing the work by way
of a change order at the request of the Contractor, and for other than Force Majeure, it is understood and
agreed that such time extension will increase the City's expenses. These expenses include, but are not
limited to, the costs associated with engineering, inspection, supervision, incidental and overhead expenses
that are directly chargeable to the Contract and that accrue during the period of extension. Therefore, the.
Contractor acknowledges that the City shall be reimbursed for its expenses before the final payment of the
ten percent (10%) retention is made.
Section 42. Guarantee
The Contractor guarantees all work against defective workmanship, and the equipment furnished, for
a period of one year from the date the City accepts the work in accordance with Section 3(c). The Contractor
shall repair and replace any and all such defective work, together with any other work which may be
displaced in so doing, at no cost to the City. The Contractor is not responsible for the repair or replacement
of equipment damaged through ordinary wear and tear, usual abuse, or neglect. The City may proceed to
repair or replace defective work and/or equipment if the Contractor fails to do so within a week after
Contractor's receipt of written notice from the City. The Contractor agrees to pay the costs and charges the
City incurs in repairing and replacing defective work and/or equipment upon demand.
Section 43. Risk of Loss Prior to Final Acceptance
Except as set forth hereinabove relating to Force Majeure, all risk of loss resulting from total or
partial destruction of the work, or any part thereof, or any damage thereto, prior to final acceptance of the
work by City, shall be borne by the Contractor regardless of the cause. The Contractor, at its sole cost, shall
repair or replace such damaged or destroyed work to its prior undamaged condition before being entitled to
additional progress payments, the final progress payment or payment of the retention. Such total or partial
- D-10 -
destruction or damage shall not excuse the Contractor from completion of the work in accordance with the
provisions of this Contract.
Section 44. Termination
(a) Termination (Contractor's Default)
(1) The Contractor will be in default if it does any of the following: (a) declares bankruptcy,
becomes insolvent, or assigns its assets for the benefit of its creditors; (b) disregards or violates a material
provision of the Contract or the City's instructions; (c) fails to prosecute the work according to the approved
construction schedule; (d) fails to provide a qualified superintendent, representative, competent workers, or
subcontractors; and/or (e) fails to provide materials or equipment that meets the requirements of the plans,
specifications, and drawings. The City, will notify the Contractor in writing of such default. Upon receipt of
written notice of default, the Contractor shall, at Contractor's expense, preserve at the project site, all
construction materials and equipment, and shall undertake immediate steps to remedy such default.
(2) If the Contractor fails to remedy such default within ten (10) working days after receipt of
written notice. of default, the City may, at its option, terminate the right to proceed with the work to which
default has occurred or may terminate the Contract. Written notice will be provided to the Contractor, but
not to the Contractor's sureties. Upon receipt of such written notice, the Contractor shall at its expense and
for the work affected by any such termination:
(i) Assist the City in making an inventory of all material and equipment located at the site,
enroute to the site, in storage or manufacture away from the site, and/or on order from
suppliers;
Assign subcontracts, material and equipment supplier contracts, and equipment rental
agreements to the City, as designated by the City; and
(iii) Remove from the site all construction material and equipment listed in said inventory
other than the material and equipment which are to be used by the City in completing the
Contract.
(3) The City shall have the right to complete the work to which the termination applies. The
Contractor agrees that the City shall have the right, for such purpose and for as long as necessary, to
designate in writing, take possession of and use any or all of the material, plant, tools, equipment, supplies
and property furnished by the Contractor.
(4) The cost of completing such work, together with reasonable costs for administering any
contract for completion, will be charged to the Contractor. The City will deduct these costs from the sum
due or the sum that may become due to the Contractor. If these costs exceed the sum which would have been
payable under the Contract, then the Contractor and/or its sureties shall be liable for and, upon written notice
from the City, shall promptly pay the excess amount to the City. The City shall not be required to retain the
bidder with the lowest estimate for completion of the work. The City may make any expenditure that, in its
sole judgment, best accomplish the completion of the project.
If such costs are less than the balance that would have been due, the Contractor shall have no claim
to the difference. The City may, however, decide to reimburse the Contractor or the Contractor's sureties for
costs incurred for materials, tools, equipment, property, and labor which were used in performing the work
and of which the City shall have received the benefit. In computing the costs, as it relates to equipment
owned by the Contractor, the salvage value at completion of the work shall be deducted from the depreciated
value at the time the Contract was terminated.
(b) Optional Termination of Contract by City (Contractor Not at Fault)
City may terminate the Contract upon ten (10) days written notice to the Contractor, if it is found that
- D-11 -
reasons beyond the control of either the City or the Contractor make it impossible or against the City's
interests to complete the work. In such a case, the Contractor shall have no claims against the City except for
(1) the cost of the work performed up to the date the Contract is terminated, and (2) for the cost of materials
and equipment at the site, in transit, or on definite commitment, as of the date the Contract is terminated,
provided that such materials and equipment would be needed in the work and meet the requirements of the
specifications.
The cost of the work performed and the cost of materials and equipment, as mentioned above, shall
be determined by the City in accordance with the procedure prescribed for malting of a final progress
payment as described in Section 3.
Section 45. Standard Specifications
The "Standard Specifications for Public Works Construction" (SSPWC) 2012 Edition published by
Building News, Inc. is hereby incorporated by this reference and made a part hereof as though fully set forth
at length. In the event, however, that said Standard Specifications are inconsistent with the terms of this
Contract, including the Special Provisions attached hereto, and then this Contract and the Special Provisions
shall be deemed controlling.
- D 12 -
IN WITNESS WHEREOF the parties hereto have executed this Contract or caused it to be executed
as of the day, month and year first above written.
APPROVED r'I�(�I/ FORM: � ,j 12
/ ti
IM
Nicholas 56orge Rodriguez, City Attorney
CITY OF VERNON
William J. D is, Mayor
CONTRACTOR
Name `il 1110-M4 l./2i29 /q/
Signature (t/(�-�.�^-
Title )OeteS,
Name oa^le- C o 4
Signature
Title
NOTE: The complete and proper legal name of the Contractor shall be set forth above. If the Contractor is a
corporation, two signatures are required, as follows: (1) the chairman of the board, the president, or any vice-
president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any
assistant treasurer. If the bidder is a limited liability company, signatures are required of two members or
managers unless otherwise provided in the company's articles of organization. If the bidder is a partnership,
signatures are required of the partner or partners authorized to sign contracts on behalf of the partnership.
- D-13 -
CALIFORNIA ALL-PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of
O /W 70/ before me,
personally appeared NZ, 6�&e,4 �Lp/iL /, awe,,, %3 ,
who proved to me on the basis of satisfactory evidence to be the persorowhose name s r subscribed to
the withi strument and acknow�ed to me that j�e/,ehe he executed the same in jxs Jeer eir uthorized
capacity ie , and that by }igher emir' ignaturesoon the instrument the person, or the entity upon behalf of
which the perso s) acted, execute the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
JUSTIN HUNNEWELL FISK
COMM #1914831 In
ui Notary PublloCellfomla
ORANGE COUNTY
Comm. Ex . DEC 2 2014
(Notary Sea[)
ADDITIONAL OPTIONAL INFORMATION
DESCRIPTION OF THE ATTACHED DOCUMENT
(Title or description of attached document)
(Title or description of attached document continued)
Number of Pages _Z_ Document Date
(Additional information)
CAPACITY CLAIMED BY THE SIGNER
❑
Individual (s)
❑
Corporate Officer
(Title)
❑
Partner(s)
❑
Attorney -in -Fact
❑
Trustee(s)
❑
Other
INSTRUCTIONS FOR COMPLETING THIS FORM
Any acknowledgment completed in California must contain verbiage exactly as
appears above in the notary section or a separate acknowledgment form must be
properly completed and attached to that document The only exception is if a
document is to be recorded outside of California. In such instances, any alternative
acknowledgment verbiage as may be printed on such a document so long as the
verbiage does not require the notary to do something that is illegal for a notary in
California (i.e. certifying the authorized capacity of the signer). Please check the
document carefully for proper notarial wording and attach this form if required.
• State and County information must be the Stale and County where the document
signer(s) personally appeared before the notary public for acknowledgment.
• Date of notarization must be the date that the signer(s) personally appeared which
must also be the same date the acknowledgment is completed.
• The notary public must print his or her name as it appears within his or her
commission followed by a comma and then your title (notary public).
• Print the name(s) of document signers) who personally appear at the time of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms (Le,
he/she/*sy, is /ure ) or circling the correct forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression most be clear and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, re -scat if a
sufficient area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public must match the signature on file with the office of
the county clerk.
+ Additional information is not required but could help to ensure this
acknowledgment is not misused or attached to a different document.
Indicate title or type of attached document, number of pages and date.
Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document
2008 Vcmion CAPA v12.10.07 800-873-9865 www.NolaryC]asses.com
E. BOND FORMS AND INSURANCE REQUIREMENTS
Contractor shall provide the City with a Workers' Compensation Certificate in a form substantially
similar to that shown herein. Both the Performance Bond and the Labor and Material Bond shall be provided
on the forms enclosed herewith. A Sample Letter of Credit is also enclosed as a guide for a bidder's security.
Insurance coverage shall be provided in the types and amounts shown on the Insurance Schedule. A
copy of the policy or a notarized letter from the insurance underwriter or carrier verifying the coverage must
be provided to the City in order to demonstrate proof of insurance.
E_1 -
WORKERS' COMPENSATION CERTIFICATE
The undersigned acknowledges that Section 3700 of the California Labor Code requires every
employer to be insured against liability for worker's compensation or to undertake self-insurance in
accordance with the provisions of that Labor Code. The undersigned agrees to comply with such provisions
before commencing the performance of this Contract.
CONTRACTOR
Name il)jLi�ppu+� ��P�Jt)
Signature �/r I ems- .7•
Title
Name
Signal
Title
NOTE: The complete and proper legal name of the Contractor shall be set forth above._ If the Contractor is a
corporation, two signatures are required, as follows: (1) the chairman of the board, the president, or any vice-
president, and (2) the corporate secretary, any assistant corporate secretary, the chief financial officer, or any
assistant treasurer. If the Contractor is a limited liability company, signatures are required of two members
or managers unless otherwise provided in the company's articles of organization. If the Contractor is a
partnership, signatures are required of the partner or partners authorized to sign contracts on behalf of the
partnership.
Workers' Compensation Certificate - 1
E_2 -
CALIFORNIA ALL-PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of
Onybefore me, 4xAg4&ZL k�,I-/1///G,
A i(Ifore insert na ne anrtle of the officer)/
personally appeared%�GI/41 elif
who proved to me on the basis of satisfactory evidence to b4c personewhose name scribed to
the within ' strument and acknow ged to me thate%sbe/ he executed the same in �xts/h� eir uthorized
capacity to , and that by l*1kfer the' signature(9 on the instrument the persor&or the entity upon behalf of
which the perso s) cted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
9i,6%2CNNEWEUSTINNULLFISK
COMM #19148NNEWE
WIT SS my and a d official seal. Notary PUGIIo-Calllomla
ORANGE COUNTY
My Comm. Exp. DEC 2 2014
Signature ofNo[a I (Notary Seal)
ADDITIONAL OPTIONAL INFORMATION
DESCRIPTION OF THE ATTACHED DOCUMENT
WO/ fS ( 0%<A' 1'4
(Title or de;ccc ppttiidnn of attac�hheej-d�document)
(Title or description of attached continued)
Number of Pages / Document Date
(Additional information)
CAPACITY CLAIMED BY THE SIGNER
❑
Individual (s)
❑
Corporate Officer
(Title)
❑
Partner(s)
❑
Attorney -in -Fact
❑
Trustee(s)
❑
Other
INSTRUCTIONS FOR COMPLETING THIS FORM
Any acknowledgment completed in California must contain verbiage exactly as
appears above in the notary section or a separate acknowledgment form must be
properly completed and attached to that document. The only exception is if a
document is to be recorded outside of California. In such instances, any alternative
acknowledgment verbiage as may be printed on such a document so long as the
verbiage does not require the notary to do something that is illegal for a notary in
California (i.e. certifying the authorized capacity of the signer). Please check the
document carefully forprmper notarial wording and attach this form if required
• State and County information must be the State and County where the document
signer(s) personally appeared before the notary public for acknowledgment.
• Date of notarization must be the date that the signer(s) personally appeared which
must also be the same date the acknowledgment is completed.
• The notary public must print his or her name as it appears within his or her
commission followed by a comma and then your title (notary public).
• Print the name(s) of document signer(s) who personally appear at the lime of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms (i.e.
he/shc/they,- is /ere) or circling the correct forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression must be clear and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, rc-seal if a
sufficient area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public must match the signature on file with the office of
the county clerk.
• Additional information is not required but could help to ensure this
acknowledgment is not misused or attached to a different document.
Indicate title or type of attached document, number of pages and date.
Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document
2008 Version CAPA v 12.10.07 800-873-9865 www.NotaryClasscs.com
EXECUTED IN TRIPLICATE
13OND No. 71362090
PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENTS: That
WHEREAS, the City Council of the CITY OF VERNON, a municipal corporation, by action on the
2012
18 t h day of December has awarded to Complete Thermal
Services, Inc. hereinafter designated as the "Principal", Contract No. CS-0338 for Ciy Hall
Building Chiller Replacement in Los Angeles County, California; and
WHEREAS, said Principal is required under the terms of said Contract to furnish a bond for the
faithful performance of said Contract;
NOW, THEREFORE, we, the Principal and _WESTERN SURETY COMPANY as Surety,
�s� i�� l o " �WN hereinafter called the "Obligee," in the penal sum of
Fi tv ive an no DOLLARS (S 75, 255.00 1
lawful money of the United States of America, for the payment of which sum well and truly to be made, we
bind ourselves, our heirs, executors, administrators and successors, jointly and severally and firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if the above bounden Principal, his
heirs, executors, administrators, successorssor assigns shall in all things stand to and abide by, and well and
truly keep and perform the covenants, conditions, and agreements in said Contract, and any alteration thereof
made as therein provided, on his part.to be kept and performed at the time and in the manner therein
specified, and in all respects according to their true intent and meaning, and shall indemnify and save
harmless the Obligee, its officers and agents, as therein stipulated, this obligation shall become null and void;
otherwise it shall be and remain in full force and virtue. And the said Surety, for value received, hereby
stipulates and agrees that no change, extension of time, alteration, or addition to the terms of the Contract, or
to the work to be performed thereunder, or the specifications accompanying the same, shall in any way affect
its obligation on this bond, and it does thereby waive notice of any such change, extension of time, alteration
or addition to the terms of the Contract, or to the work or to the specifications, and said Surety agrees that in
case suit is brought on this bond, Surety will pay City's reasonable attorney's fees to be fixed by the court.
Performance Bond - 1
IN WITNESS WHEREOF, three (3) identical counterparts of this instrument, each of which shall for
all purposes be deemed an original hereof, have been duly executed by the Principal and Surety above
named, on the 2nd day of January 2013..
Name COMPLETE THERMAL SERVICES, INC.
q (Principal)
(Attach Acknowledgment) By
Name WESTERN SURETY COMPANY
(Surety)
By (/ 1 t r t
L, Davis, Asa't. Sec.
By
(Attorney -in -fact)
APPROVED AS TO FORM:
n( ti�ti
Nicholas Ge+rge Oftuez, City Attorney
Performance Bond - 2
CALIFORNIA ALL-PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of
On v before me, personally appeared 0-6 ,im Z, O 4112�
who proved to me on the basis of satisfactory evidence to be the persorl;(o whose name Is/ subscribed to
the within instrument and knowledged to me that aeY executed the same in is /xlteir authorized
capacity(Ies), and that b his/ t.Iteir signaturek on e. instrument the person(s)or the entity upon behalf of
which the person( acte , ecuted the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct.
official seal.
9USTiN HUNNEWELL FISKCOMM #1914831 In
Notary Publlo-Callfomle .a
ORANGE COUNTY
My Comm. Exo. DEC 2.2014
(Notary Seal)
ADDITIONAL OPTIONAL INFORMATION
DESCRIPTION OF THE ATTACHED DOCUMENT
(Title or description of attached document)
(Title or description of attached document continued)
Number of Pages —.71— Document Date
(Additional information)
CAPACITY CLAIMED BY THE SIGNER
❑ Individual (a)
❑ Corporate Officer
(Title)
❑ Partner(s)
❑ Attorney -in -Fact
❑ Trustee(s)
❑ Other
INSTRUCTIONS FOR COMPLETING THIS FORM
Any acknowledgment completed in California must contain verbiage exactly as
appears above in the notary section or a separate acknowledgment form must be
properly completed and attached to that document. The only exception is if a
document is to be recorded outside of California. In such instances, any alternative
acknowledgment verbiage as may be printed on such a document so long as the
verbiage does not require the notary to do something that is illegal for a notary in
California (i.e. certifying the authorized capacity of the signer). Please check the
document carefully for proper notarial wording and attach this form if required
• Slate and County information must be the State and County where the document
signers) personally appeared before the notary public for acknowledgment.
• Date of notarization must be the date that the signer(s) personally appeared which
must also be the same date the acknowledgment is completed.
• The notary public must print his or her name as it appears within his or her
commission followed by a comma and then your title (notary public).
• Print the name(s) of document signer(s) who personally appear at the time of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms (i.e.
Wshe/ilwy— is /ere ) or circling the correct forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression must be clear and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, re -seal if a
sufficient area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public must match the signature on file with the office of
the county clerk.
Additional information is not required but could help to ensure this
acknowledgment is not misused or attached to a different document.
Indicate title or type of attached document, number of pages and date.
Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document
2008 Version CAPA v12.10.07 800-873-98G5 www.NotaryClasscs.com
EXECUTED IN TRIPLICATE
BOND No. 71362090
LABOR AND MATERIAL BOND
KNOW ALL MEN BY THESE PRESENTS: That
WHEREAS, the City Council of the City of Vernon, a municipal corporation, by action on the
2012
18th
day of December -20.3, has awarded to Complete Thermal
Services, Inc. , hereinafter designated as the "Principal," Contract No. CS-0338 for City Hall
Building Chiller Replacement in Los Angeles County, California; and
WHEREAS said Principal is required to furnish a bond in connection with said Contract providing
that if said Principal or any of his subcontractors shall fail to pay for any materials, provisions, provender, or
other supplies, or teams used in, upon, for or about the performance of the work contracted to be done, or for
any work or labor done thereon of any kind, or for amounts due under the Unemployment Insurance Act, the
Surety on this bond will pay the same to the extent hereinafter set forth.
NOW, THEREFORE, we, the Principal and WESTERN SURETY COMPANY
as Surety, r4leld vd d E' b�qugc�unrlq the CITY OF VERNON in the penal sum of .Seventy Five
Thousan wo un r r t�y ive DOLLARS ($_75.255.00 ), lawful
money o t e United States of America, for the payment of which sum well and truly to be made, we bind
ourselves, our heirs, executors, administrators, and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that if said Principal, his subcontractors,
heirs, executors, administrators, successors, or assigns, shall fail to pay for any materials, provisions,
provender or other supplies or teams used in, upon, for or about the performance of the work contracted to be
done, or for work or labor thereon of any kind, or fail to pay any of the persons named in California Civil
Code Section 3181, or amounts due under the Unemployment Insurance Code with respect to work or labor
performed by any such claimant, or for any amounts required to be deducted, withheld, and paid over to the
Franchise Tax Board from the wages of employees ofthe Contractor and his subcontractors pursuant to
Section 18663 of the Revenue and Taxation Code with respect to such work and labor, and all other
applicable laws of the State of California and rules and regulations of its agencies, then said Surety will pay
the same in or to an amount not exceeding the amount hereinabove set forth, and also will pay, in case suit is
brought upon this bond, such reasonable attorneys' fees as shall be fixed by the court, pursuant to Section
3191 of the California Civil Code.
This bond shall inure to the benefit of any of the persons named in Section 3181 of the California
Civil Code, so as to give a right of action to them or their assigns in any suit brought upon this bond, and the
said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration, or
addition to the terms of the Contract, or the work to be performed thereunder, or the specifications
accompanying the same, shall in any way affect its obligation on this bond, and it does hereby waive notice
of any such change, extension of time, alteration, or addition to the terns of the Contract, or to the work or to
the specifications.
Labor and Material Bond - I
IN WITNESS WHEREOF, three (3) identical counterparts of this instrument each of which shall for
all purposes be deemed an original thereof, have been duly executed by the Principal and Surety above
named on the end day of January 2013.
Name COMPLETE THERMAL SERVICES INC.
(Principal)
(Attach Acknowledgment) By
APPROVED
Nicholas
STATE OF SOUTH DAKOTA
SS
County of Minnehaha
Name WESTERN SURETY COMPANY
LZ
M
(Surety)
L. Davis, AWL SeG.
(Attorney -in -fact)
City Attorney
ACKNOWLEDGMENT OF SURETY
(Corporate Officer)
On this 2nd day of January 2013 before me, a Notary Public in
and for said County, personally appeared
L. Davis, Ase't. Sec.
personally known to me, who being by me duly sworn, did say that he is the aforesaid officer of WESTERN SURETY
COMPANY, a corporation duly organized and existing under the laws of the State of South Dakota, that the seal affixed to the
foregoing instrument is the corporate seal of said corporation, that the said instrument was signed, sealed and executed on
behalf of said corporation by authority of its Board of Directors, and further acknowledge that the said instrument and the
execution thereof to be the voluntary act and deed of said corporation.
IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my official seal the day and year last above
written. I I
My commission g ires J. Hrwom
dly COMMISWOrl Expired 6-22-2013
Notary Public
Form 11/3-12-96
Western Surety Company
POWER OF ATTORNEY - CERTIFIED COPY
Bond No. 71362090
Know All Men By These Presents, that WESTERN SURETY COMPANY, a corporation duly organized and existing under the
laws of the State of South Dakota, and having. its principal office in Sioux Falls, South Dakota (the "Company"), does by these presents
make, constitute and appoint - L. Davis
its true and lawful attorney(s)-in-fact, with full power and authority hereby conferred, to execute, acknowledge and deliver for and on
its behalf as Surety, bonds for:
Principal: Complete Thermal Services, Inc.
Obligee: City of Vernon
Amount: $500,000.00
and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the Senior Vice President, sealed
with the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said
attorney(s)-in-fact may do within the above stated limitations. Said appointment is made under and by authority of the following
bylaw of Western Surety Company which remains in full force and effect.
"Section 7. All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the
corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President or by such
other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the
Treasurer may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of
the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other
obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile."
All authority hereby conferred shall expire and terminate, without notice, unless used before midnight of June 1
2013 —,but until such time shall be irrevocable and in full force and effect.
In Witness Whereof, Western Surety Company has caused these presents to be signed by its Vice President, Paul T. Bruflat, and
this 2nd day of January 2013
WES SURE Y COMPANY
r
Paul T. Auflat, Vice President
as
On this 2nd day of - January , in the year 2 013 , before me, a notary public, personally appeared
Paul T. Bruflat, who being to me duly sworn, acknowledged that he signed the above Power of Attorney as the aforesaid officer of
WESTERN SURETY COMPANY and acknowledged said instrument to be the voluntary act and deli of said q�or tiory
/0444444444bS444444444444� J\ I �/Gn
S. PETRIK i
NOTARY PUBLIC
pr't`JSOUTH DAKOTA SEAL i Notary Public - South Dakota
*h44444444444bbb00464004+
My Commission Expires August 11, 2016
I the undersigned officer of Western Surety Company, a stock corporation of the State of South Dakota, do hereby certify that the
attached Power of Attorney is in full force and effect and is irrevocable, and furthermore, that Section 7 of the bylaws of the Company
as set forth in the Power of Attorney is now in force.
In testimony whereof, I have hereunto set my hand and seal of Western Surety Company this 2nd day of
January 2013
W E S R SURE Y COMPANY
Paul T. Auflat, Vice President
Form F5306-8-2012
CALIFORNIA ALL-PURPOSE
CERTIFICATE OF ACKNOWLEDGMENT
State of California
County of
personally appeared
who proved to me on the basis of satisfactory evidencA to be the person(kywhose name is/ subscribed to
the within instrument and acknowledged to me that 6 /they executed the same in is authorized
capacity(iesy,, and that bChhi)�their signature(, , onI the instrument the person(�sa; or entity upon behalf of
which the person( acted; executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph
is true and correct
9XIS011IIJINN HNEWELL FISK t
CM #1914831 �n
WI ESS JZ official seal. Notary Putillo-Celifornle
ORANGE COUNTY
Comm. Ex . DEC 2 2014
(Notary Seal)
ADDITIONAL OPTIONAL INFORMATION
DESCRIPT N OF THE
ATTACHED DOCUMENT
/'/V "`
V(Title or description of attached document)
(Title or description of attached document continued)
Number of Pages —1— Document Date
(Additional information)
CAPACITY CLAIMED BY THE SIGNER
❑ Individual (s)
❑ Corporate Officer
(Title)
❑ Partner(s)
❑ Attorney -in -Fact
❑ Trustee(s)
❑ Other
INSTRUCTIONS FOR COMPLETING THIS FORM
Any acknowledgment completed in California nmst contain verbiage exactly as
appears above in the notary section or a separate acknowledgment form must be
Property completed and attached to that document. The only exception is if a
document is to be recorded outside of California. In such instances, any alternative
acknowledgment verbiage as may be printed on such a document so long as the
verbiage does not require the notary to do something that is illegal for a notary in
California (i.e. certifying the authorized capacity of the signer). Please check the
document carefully for proper notarial wording and attach this. form if required.
• Stale and County information must be the State and County where the document
signer(s) personally appeared before the notary public for acknowledgment.
• Date of notarization must be the date that the signers) personally appeared which
must also be the same date the acknowledgment is completed.
• The notary public must print his or her name as it appears within his or her
commission followed by a comma and then your title (notary public).
• Print the name(s) of document signer(s) who personally appear at the time of
notarization.
• Indicate the correct singular or plural forms by crossing off incorrect forms (i.e.
he/she/they— is /ere) or circling the comet forms. Failure to correctly indicate this
information may lead to rejection of document recording.
• The notary seal impression must be clear and photographically reproducible.
Impression must not cover text or lines. If seal impression smudges, re -seal if a
sufficient area permits, otherwise complete a different acknowledgment form.
• Signature of the notary public must match the signature on file with the office of
the county clerk.
Additional information is not required but could help to ensure this
acknowledgment is not misused or attached to a different document.
Indicate title or type of attached document, number of pages and date.
Indicate the capacity claimed by the signer. If the claimed capacity is a
corporate officer, indicate the title (i.e. CEO, CFO, Secretary).
• Securely attach this document to the signed document
2008 Version CAPA vl2.10.07 800-873-9865 www.NotaryClasses.com
Complete
IIiT& 1i"
Services, Inc.
January 24, 2013
Pin Chan, Project Engineer
City of Vernon
4305 Santa Fe Ave.
Vernon, CA 90058
Subject: Performance and Labor and Material Bonds
This is to notify that Complete Thermal Services, Inc. concurs that the City of Vernon type in the
"contract awarded date" of December 18, 2012 on the two bonds for the City Hall Chiller Replacement
project.
Sincerely,
William L. Clements
President
11570 Seaboard Circle
Stanton
CH 90680
Tel 714. 891. 2265
Fox 714. 891. 2086
GENERAL PURPOSE RIDER
TO BE ATTACHED to and form part of Bond Number
71362090
issued by the
WESTERN SURETY COMPANY ,as
Surety, on behalf of Complete Thermal Services, Inc. Of
11570 Seaboard Cir., Stanton, CA 90680 , hereinafter referred
to as the Principal and in favor of city of Vernon
of 9305 Santa Fe Avenue, Vernon, CA 90058 hereinafter
Seventy -Five Thousand Two Hundred Fifty -Five and
referred to as the Obligee, in the sum of 00/100
Dollars( $75, 255. 00 ), effective the 2nd day of January 2013
NOW, THEREFORE, it is agreed that the Contract date is December 18, 2012
IT IS FURTHER AGREED that all other terms and conditions of this bond shall remain unchanged.
THIS RIDER IS TO BE EFFECTIVE the 25th day of January 2013
SIGNED, SEALED AND DATED this 25th day of January 2013
Accepted By:
City of Vernon Complete Thermal .Services, Inc
(Principal)
By: By: (Seal)
RN SURETY COMPANY
By: I 42— - -1 • (Seal)
Paul T. aruflat, Vice Pr sident__A#l;g y-in-Fact
Form F9976
Western Surety Company
101%WGI1461QGVW003121WdwloDI0101WR"11160 8M
Bond No. 71362090
Enow All Men By These Presents, that WESTERN SURETY COMPANY, a corporation duly organized and existing under the laws
of the State of South Dakota, and having its principal office in Sioux Falls, South Dakota (the "Company"), does by these presents make,
constitute and appoint —_ Paul T. Bruflat
its true and lawful attorney(s)-in-fact, with full power and authority hereby conferred, to execute, acknowledge and deliver for and on its
behalf as Surety, bonds for:
Principal: Complete Thermal Services, Inc.
Obligee: City of Vernon
Amount: $500,000.00
and to bind the Company thereby as fully and to the same extent as if such bonds were signed by the Senior Vice President, sealed with
the corporate seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said attomey(s)-in-fact
may do within the above stated limitations, Said appointment is made under and by authority of the following bylaw of Western Surety
Company which remains in full force and effect.
"Section 7. All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the
corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President or by such other
officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer
may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company.
The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the
corporation. The signature of any such officer and the corporate seal may be printed by facsimile."
All authority hereby conferred shall expire and terminate, without notice, unless used before midnight of June 1
2013 , but until such time shall be irrevocable and in full force and effect.
In Witness Whereof, Western Surety Company has caused these presents to be signed by its Vice President, Paul T. Bruflat, and its
corporates_ }j%4Laffixed this 25th day of January 2013
—OR 0r'T4 s
WEST R SURE COMPANY
r
Paul T, Arriflat, Vice President
ST1Y.'yaJr-sGl bYTA
Co
On this 25th day of January ,in the year 20i3 ,before me, a notary public, personally appeared
Paul T. Brullat, who being to me duly sworn, aknowledged that he signed the above Power of Attorney as the aforesaid officer of
WESTERN SURETY COMPANY and acknowledged said instrument to be the voluntary act and dee f said Pat'
'4\\g11Yh4hM\4Nb\bM\4q i
S. PETRIK ;
i L NOTARY PUBLIC 6EAL i otary Public - South Dakota
r SOUTH DAKOTA�f
�\\\b\Nb4444b4......... ✓F
My Commission Expires August 11, 2016
I the undersigned officer of Westernn Suuety Company, a stock corporation of the State of South Dakota, do hereby certify that the
attached Power of Attorney is in full force and effect and is irrevocable, and furthermore, that Section 7 of the bylaws of the Company as
set forth in the Power of Attorney is now in forme.
In testimony whereof, I have hereunto set my hand mid seal of Western Surety Company this 25th day of
January 1 2013 .
Form F6806-e-2012
WEST R SURE COMPANY
r�
Paul T. A uflat, Vice President
k
INSURANCE SCHEDULE (CONTRACTOR)
Contractor shall provide proof of insurance, including but not limited to, a standard certificate of insurance,
in at least the following amounts and coverage (combined single limit permitted):
I. Coverage and Limits
Bodily Iniury Property Damage
Hazards Each Person Each Accident Each Accident
Automobile Liability
Owned Automobiles
$
500,000
$1,000,000 $ 500,000
Hired Automobiles
$
500,000
$1,000,000 $ 500,000
Non -Owned Automobiles
$
500,000
$1,000,000 $ 500,000
Workers' Compensation
$
Statutory
Employers' Liability
$1,000,000
per employer
II. Liability
General Liability
$1,000,000
$2,000,000
$1,000,000
Premises Operations
$1,000,000
$2,000,000
$1,000,000
Elevators (If Applicable)
$1,000,000
$2,000,000
$1,000,000
Independent Contractors
$1,000,000
$2,000,000
$1,000,000
Products - Completed Operations
$1,000,000
$2,000,000
$1,000,000
Contractual Liability
$1,000,000
$2,000,000
$1,000,000
Umbrella Liability
$2,000,000
$2,000,000
$2,000,000
a. The general liability policy shall contain the following special endorsements which shall be noted on
or attached to the standard certificate of insurance:
7
1. An endorsement naming the City of Vernon, its officers, and employees as additional insureds
under the policy.
2. An endorsement providing the City of Vernon thirty (30) days notice of cancellation or material
reduction of coverage.
3. An endorsement providing coverage for all operations under this Agreement.
4. Such other endorsement as may be required by the City.
b. In addition to the above, the Contractor shall provide such further proof of insurance documentation
as the City deems necessary.
DOCUMENTATION REQUIRED
• Certificate of Insurance from contractor's insurance agent;
• Copy of insurance policy Declaration Page for General and Umbrella Liability;
• Actual copies of any Endorsement;
• Additional Insured Endorsement naming City as Additional Insured, Form CG 2010-1185 required;
• Contractor's insurance package to include Endorsement appropriate to the project being undertaken
on the City's behalf,
• Copy of Schedule of Forms and Endorsements
Commercial Certificate of Insurance
FARMER S
Agency
. MOSHER INSURANCE AGENCY
Name . 4113 LOS COYOTES DIAGONAL
&
Issue Date (MM/DD/YY) 12/27/12
• LAKEWOOD, CA. 90713
Address
This certificate is issued as a matter of Information only and confers no rights
upon the certificate holder. This certificate does not amend, extend or alter the
St. 29 Dist. 62 Agent 397 coverage afforded by the policies shown below..
Companies Providing Coverage:
Insured
an Cons r A 'frock insurance Exchange
. COMPLETE THERMAL SERVICES
Imerp
Name . 11570 SEABOARD CIRCLE
company B Farmers Insurance Exchange
& • STANTON, CA. 90680
filter
company C Mid -Century Insurance Company
Address -
Uner
Company
Letter
Coverages
This Is to certify that the policies of Insurance listed below have been Issued to the Insured
named above for the policy period Indicated. Notwithstanding
.
any requirement, term or condition of any contract or other document with respect to which this certificate may be issued or may pertain, the Insurance
'r
afforded by the policies described herein Is subjtet to all the terms, exclusions and conditions of such policies. Limps shown may have been reduced by
paid claims.
La'
La'
Type of Tnsurence
yp
Pnlicy Numl)el*
Policy Effective
Date IMM/DD/vY)
Policy Expinniun
Date (NINIMD/YY)
Policy Limits
A
General liability
09418-18.62
04/01/12
04/01/13
General Aggregate
$2,000,000
X
Commercial General
Products-Comp/Ops
Liability
Aggregate
$2,000,000
- Occurrence Version
I
Personal &
Advertising Injury
S 2,000,000
Contractual - Incidental
I -
Each Occurrence
Y �,000,000
I
Only
Fire Damage
Owners & Contractors Prot.
(Any one fire)
S 2,000,000
Medical Expense
(Any one person)
$2,000.000
A
X
Automobile Liability
09418-18-62
04/Ol/12
04/04/13
Combined Single
All Owned Commercial
Limit
S 2,000,000
Autos
Bodily Inj)ury
Scheduled Autos
I
(Per person
$
X
Hired Autos
Bodily Injury
X
Non -Owned Autos
I
(PeraWdent)
$
Garage Liability
Property Damage
S
I
Garage Aggregate
S
A
X
Umbrella Liability
60483-47.56
03/01/12
03/01/13
Limit
S 4,000,000
A X
Workers' Compensation
A0922.5-49
03/01/12
13/01/13 -
Statutory
and
Each Accident
S 1,000.000
Employers' Liability
Disease - coal Empioyew
S 1000000
Disease - Policy Limit
S 1:000:000
Description of Operations/Vehicles/Resu9ctions/Special items:
-
Certificate holder, its officials, and employees are listed as additional insureds..
—�"—•' w..,...-.'w,� 111�1UV 10 MUU IKAYML IrvJVRCU0.
Certificate Holder
. CITY OF VERNON
Natne . 4305 SANTA FE AVENUE
& . VERNON. CA. 90058
Address -
Cancellation
Should any of the above described policies be cancelled before the expiration date
thereof, the Issuing company will endeavor to mall30 days written notice to the
certificate holder named to the left, but failure to mall such notice shall impose no
obligation or liability orally kind upon the company. Its agents or representatives.
LvtZ" AYd4. Lri'c� #: 0 42743
56-2492- 4-04
POLICY NUMBER: 09418-18.62 COMMERCIAL GENERAL LIABILITY
NAMED INSURED: COMPLETE THERMAL SERVICES
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY
ADDITIONAL INSURED -- OWNERS, LESSEES OR CONTRACTORS
(FORM B)
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
Name of Person or Organization:
THE CITY OF VERNON, ITS OFFICERS, AND EMPLOYEES
(If no entry appears above, information required to complete this endorsement will be shown in the
Declarations as applicable to this endorsement.)
WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown
in the Schedule, but only with respect to liability arising out of "your work" for that insured by or for you.
It is further agreed that such Insurance as is afforded by this policy fix the benefit of the above Additional
Insured(s) shall be primary insurance as respects any claim, loss or liability arising out of the Named -
Insured's operations, and any other insurance maintained by the Additional Insured(s) shall be excess and
non-contributory with the insurance provided hereunder. -
CG 20 10 1185 Copyright, Insurance Services Office, Inc.
RISK MANAGEMENT
INTER -DEPARTMENT MEMORANDUM
DATE: January 17, 2,'0'13
TO: Pift Chan, Ptoject Ehg�ine6r
PROM: Teresa McAllister
HuMan Resource; Directo
RE: Complete Thermal S.6tvices - City Hall Building Chil.16r
'keplacement - Contract No. C8-0338
Please be advised that Complete Thermal Services has: provided
acceptable insurance coverage.
Complete -Thermal services will remove and replace an existing
chiller unit located on the roof of the
City Hall building.
PROOF OF INSURANCE
APPROVAL AS TO FORM
Proof of the following insurance coverage has been received and approved as to form:
(1)
Contractual Liability.
(2)
Automobile Liability.
(3)
Worker's Compensation.
(4)
Employer's Liability.
(5)
General Liability.
(6)
Umbrella Liability.
Dated:
2( �, 10
George Rodriguez, City Attorney
- E-8 -
(BANK OR SAVINGS AND LOAN ASSOCIATION LETTERHEAD)
Date:
ft
City of Vernon
4305 Santa Fe Avenue
Vernon, CA 90058
Gentlemen:
n
M
P
L
E
IRREVOCABLE LETTER OF CREDIT
Contract No.
Please consider this letter as an Irrevocable Letter of Credit pledging that in
the amount of $ is/are deposited and guaranteed to insure the Contractor's faithful
performance under Contract No. in lieu of withholding any funds due the Contractor under
progress payments. In compliance with Part 5 (commencing with Section 22300) of Division 2 of the
California Public Contract Code, we agree that the funds or other securities designated by this instrument
shall become trust funds for the purposes set forth in this instrument. This instrument shall terminate upon
formal acceptance by the City Council of the City of Vernon of the work performed by the Contractor under
said Contract.
Any claims under this Irrevocable Letter of Credit shall be presented in the following manner:
The City's written statement, signed by the Director of Community Services,
certifying that there has been loss, damage or liability resulting from the Contractor's
duties and obligations under Contract, or from negligence, act or omission of the
Contractor, its agents, servants and employees (such statement to be substantiated by
an attached detailed report) in the amount of the accompanying sight draft on us and
that the amount of this draft is therefore now due and payable.
The above statement will be all that is required to certify the amount set forth under this Irrevocable Letter of
Credit, dated this date, is due and payable to the City of Vernon pursuant to the above -stated Contract No.
(Name of Bank or Savings and Loan Association)
By
President
By
Secretary
ALL SIGNATURES MUST BE NOTARIZED
Attach proper jurats
• Securities as listed in Section 16430 of the Government Code, or bank or savings and loan
certificates of deposit.
- E-9 -
OFFICE OF THE CITY CLERK
4305 Santa Fe Avenue, Vernon, California 90058
Telephone (323) 583-8811
June 5, 2013
County of Los Angeles
Registrar -Recorder
Document Analysis and Recording
P.O. Box 1250
Norwalk, CA 90651-1250
Re: Completion of Contract No. CS-0338
Dear Sir or Madam:
Transmitted herewith is a Notice of Completion to be recorded by your office.
Please return the Recorded Notice to the attention of the undersigned.
Very truly yours,
Az�l 7
Deborah R. Juare
Records Management Assistant
Enclosure
c: William Fox
Rafael Contreras
S. Kevin Wilson
Contract No. CS-0338
Resolution No. 2012-244
E�ccfusivefy Industriaf
Recording Requested By
City of Vernon, Department of Community Services and water
Fee Waived Pursuant To Govt. Code 6103
When Recorded Mail To:
City Clerk
4305 Santa Fe Avenue
Vernon, CA. 90058
SPACE ABOVE THIS LANE RESERVED FOR RECORDER'S USE
NOTICE OF COMPLETION
NOTICE OF COMPLETION IS HEREBY GIVEN that
1. The City of Vernon, whose address is 4305 Santa Fe Avenue, Vernon, California, as Owner of the public work of
improvement known as the City Hall Chiller Replacement Project, located at 4305 Santa Fe Avenue, Vernon
CA 90058 as improved in accordance with Contract No. CS-0338 between Complete Thermal Services, Inc.
whose address is: 11570 Seaboard Circle Stanton, California 00680 as CONTRACTOR, and the
DEPARTMENT OF COMMUNITY SERVICES AND WATER for the following work, to wit:
Furnish all necessary labor, material, equipment, transportation and service for the removal and
salvage/disposal of an existing chiller unit and associated apparatus, and furnish and install a new
chiller unit as described within the project specifications.
2. Notice is given that the Work of Contract No. CS-0338, as amended by Owner -approved changes, if any, was
completed on June 6, 2013, provided, however, this notice does not alter the responsibility of the Contractor for
any failure to comply with the requirements of the Contract Documents including, but not limited to, Contractor's
liability for any unauthorized or non -conforming work [and does not constitute acceptance of any disputed
claims].
The name of the surety on said contract is: Western Surety Company
This notice is given in accordance with the provisions of Section 3093 of the Civil Code of the State of California.
Dated: to15-L13
Dana Reed, Interim City Clerk
DEPARTMENT OF MMUNITY SERVICES & WATER
CITY OF VERNO
BY:
u vin Wilson, P.E.
Director of Community Services & Water
VERIFICATION
I, Samuel Kevin Wilson, Director of Community Services & Water, state that I am an officer of the City of Vernon, to wit: Director of Community
Services & Water; that i have read the foregoing Notice of Completion and know the contents thereof and that same is true of my own knowledge,
except as to the matters which are therein stated on information or belief, and as to those matters I believe Wto be true. I declare under penalty of
perjury under the laws of the State of California that the foregoing is We and correct Executed in the City o
117,
_ on on the above stated date.
1
Ii 7 Sam K i1 on, P.E.
Director Approved as to4 o Community Services & Water
.
City Attome3�-/
Nicholas George Rodriguez
RECEIVED
MAY 2 9 2013
RECEIVED 1W CITY ADMINISTRATION
MAY 2 9 2013 STAFF REPORT
CITY CLERK'SOMMUNITY SERVICES & WATER DEPARTMEN
EnQ
DATE: June 4, 2013
TO: Honorable Mayor and City Council
FROM: Samuel Kevin Wilson, Director of Community Services & Water
RE: Contract No. CS-0338: City Hall Building Chiller Replacement —
Acceptance of Work
Recommendation
It is recommended that the City Council:
Affirm that accepting the work of Complete Thermal Services, Inc., on the City Hall
Building Chiller Replacement Project, Contract No. CS-0338, is exempt under the
California Environmental Quality Act (CEQA) in accordance with Title 14, Chapter
3, Class 1, Section 15301, and in accordance with Section 15061(b)(3) because the
project consisted of the repair of an existing mechanical piece of equipment involving
no expansion of use beyond that existing at time of the lead agency's determination.
2. Accept the work by Complete Thermal Services, Inc. as part of the City Hall Building
Chiller Replacement Project, Contract No. CS-0338.
Background
The project involves the repair to the City Hall's 30 year old Heating, Ventilation and Air
Conditioning (HVAC) system. The Community Services Department obtained approval on
October 31, 2012 to advertise to obtain competitive bids for the replacement of the chiller unit
servicing the City Hall building located at 4305 Santa Fe Avenue. Bids were sought per the
City's Purchasing Procedures and the contract was awarded to Complete Thermal Services, Inc.
on December 18 , 2012. The work has been completed in accordance with the project
specifications and it is recommended that the work be accepted.
Fiscal Impact
The City Hall Building Chiller Replacement contract was awarded to Complete Thermal
Services, Inc. with a total bid amount of $75,255. There were no contract change orders. It is
recommended that the project be accepted and that the five percent (5%) retention of $3,762.75
be paid thirty-five (35) days after the recordation of the Notice of Completion, except such
amounts as are required by law to be withheld by properly executed and filed notices to stop
payment, or as may be authorized by the contract to be further retained.
COMMUNITY SERVICES & WATER DEPARTMENT
OFFICE MEMORANDUM
En
TO: Mark Whitworth, City Administrator
9J
FROM: Samuel Kevin Wilson, Director of Community Services & Water
DATE: June 4, 2013
SUBJECT: Contract No. CS-0338: City Hall Building Chiller Replacement —
Acceptance of Work
The City Hall Building Chiller Replacement Project is completed and all work has been
found to be acceptable. The Department of Community Services and Water recommends that the
work be accepted by the City Council at its next City Council meeting.
SKW/rc
RECEIVED �
This page is part of your document - DO NOT DISCARD JUL 01 20A
flo2013087656411IRK'SOFFICE
III II IIIII II I IIIII II IIII in IIIII IIIII IIIII IIIII IIII III Po�Oz
+ Recorded/Filed i } Recorder's Office, Los Angeles County,
California
06/12/13 AT 11:46AM
LEADSHEET
201306120090080
00007853777
IIIIIII IIIII IIIII lull IIIII IIIII IIIII IIIII IIIII IIII IIII
004930030
SEQ:
01
DAR - Mail (Hard Copy)
IIIIIII IIIII IIII IIIII IIIIII IIII IIII IIII IIII NIIII IIII I IIIII IIII IIII IIIIII IIIIII IIIII IIIII III IIII
IIIIII IIIIII IIIII IIIII IIIII IIII IIIIII IIIII IIIII IIIII IIIIII IIII IIIII IIIIII IIII IIIII IIIII IIIIII III IIII
THIS FORM IS NOT TO BE DUPLICATED
Feu
PEES:
TAXES:
OTHER:
PAID:
0.00
0.00
0.00
0.00
Recording Requested By
City of Vernon, Department of Community Services and water
Fee Waived Pursuant To Govt. Code 6103
When Recorded Mail To:
City Clerk
4305 Santa Fe Avenue
Vernon, CA. 90058
06/12/2013
ABOVE THIS LINE RESERVED FOR RECORDERS USE
NOTICE OF COMPLETION
NOTICE OF COMPLETION IS HEREI3Y'61VEN"that
1. The City of Vernon, whose address is 4305 Santa Fe Avenue, Vernon, California, as Owner of the public work of
improvement known as the City Hall Chiller Replacement Project, located at 4305 Santa Fe Avenue, Vernon
CA 90058 as improved in accordance with Contract No. CS-0338 between Complete Thermal Services, Inc.
whose address is: 11570 Seaboard Circle Stanton, California 90680 as CONTRACTOR, and the
DEPARTMENT OF COMMUNITY SERVICES AND WATER for the following work, to wit:
Furnish all necessary_labor, material, equipment transportation and service for the removal and
salvage/disposal of an existing chiller unit and associated apparatus, and furnish and install a new
chiller unit as described within the project specifications.
2. Notice is given that the Work of Contract No. CS-0338, as amended by Owner -approved changes, if any, was
completed on June 6, 2013, provided, however; this notice does not alter the responsibility of the Contractor for
any failure to comply with the requirements of the Contract Documents including, but not limited to, Contractor's
liability for any unauthorized or non -conforming work [and does not constitute acceptance of any disputed
claims].
The name of the surety on said contract is: Western Surety Company
This notice is given in accordance with the provisions of Section 3093 of the Civil Code of the State of California.
Dated: �a%S `/J� "'` DEPARTMENT. OF M,MUNITY SERVICES.& WATER
CITY OF VERNO
BY:
S mu vin Wilson, P.E.
Director of Community Services & Water
Dana Reed, Interim City Clerk
VERIFICATION
1, Samuel Kevin Wilson, Director of Community Services & Water, state that I am an officer of the City of Vernon, to wit: Director of Community
Services & Water; that I have read the foregoing Notice of Completion and know dte contents thereof and that same is true of my own knowledge,
except as to the matters which are therein stated on information or belief, and as to those matters I believe, to be true. I declare under penalty of
perjury under the laws of the State of California that the foregoing is true and correct. Executed in the City o on on the above stated date.
I
Approved as to F�r 13
City Attome} J
Nicholas George Rodriguez
Samnel K Xigon, P.E.
Director o Community Services & Water