Resolution No. 2014-050RESOLUTION NO. 2014-50
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
VERNON APPROVING AND ADOPTING AN UPDATED GENERAL
FEE SCHEDULE
WHEREAS, on July 1, 2014, the City Council of the City of
Vernon adopted Resolution No. 2014-42 approving and adopting a General
Fee Schedule; and
WHEREAS, by memorandum dated August 5, 2014, the Fire Chief
has recommended the City Council adopt an updated General Fee
Schedule, attached hereto as Exhibit A and incorporated herein by
reference (the "Updated General Fee Schedule"), to set the existing
false security alarm fee for the second emergency response within a
fiscal year to be $0; and
WHEREAS, the Council desires to approve the updated General
Fee Schedule.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF VERNON AS FOLLOWS:
SECTION 1: The City Council of the City of Vernon hereby
finds and determines that the above recitals are true and correct.
SECTION 2: The City Council of the City of Vernon finds
that this action is not subject to the California Environmental
Quality Act (CEQA), in accordance with CEQA Guidelines Section
15061(b)(3), the general rule that CEQA only applies to projects that
may have an effect on the environment, because this merely relates to
an administrative item.
SECTION 3: The City Council of the City of Vernon hereby
approves and adopts the updated General Fee Schedule as set forth in
Exhibit A.
SECTION 4: The provisions of Resolution No. 2014-42 not
consistent with or in conflict with this resolution are hereby
repealed; in all other respects, Resolution No. 2014-42 shall remain
in full force and effect, without amendment.
SECTION 5: The City Clerk, or Deputy City Clerk, of the
City of Vernon shall certify to the passage, approval and adoption of
this resolution, and the City Clerk, or Deputy City Clerk, of the City
of Vernon shall cause this resolution and the City Clerk's, or Deputy
City Clerk's, certification to be entered in the File of Resolutions
of the Council of this City.
APPROVED AND ADOPTED this 5th day of August, 2014.
ATTEST:
Ana arcia
C4tq-f=i'9kEt-./ Deputy City Clerk
APPROVED AS TO FORM:
Name: W. Michael McCormick
Title: Mayor / rrdyaf rro-ren��
Scott Porter, Deputy City Attorney
- 2 -
STATE OF CALIFORNIA )
) ss
COUNTY OF LOS ANGELES )
I Aria Barcia}/ Deputy City Clerk of the City
of Vernon, do hereby certify that the foregoing Resolution, being
Resolution No. 2014-50, was duly passed, approved and adopted by the
City Council of the City of Vernon at a regular meeting of the City
Council duly held on Tuesday, August 5, 2014, and thereafter was duly
signed by the Mayor or Mayor Pro-Tem of the City of Vernon.
Executed this '� day of August, 2014, at Vernon, California.
(SEAL)
na Bar
l
Deputy City Clerk
- 3 -
EXHIBIT A
GENERAL FEE SCHEDULE
City of Vernon
Schedule approved by City Council on July 1, 2014
Revised August 5, 2014
CITY OF VERNON
GENERAL FEE SCHEDULE
TABLE OF CONTENTS
ADMINISTRATIVE FEES
BUILDING, PLANNING, AND ENGINEERING FEES
PermitFees ---------------------------------------------------
Certificate of Occupancy Fees ----------------------------
Inspection and Other Fees ---------------------------------
ENCROACHMENT, LICENSE & FRANCHISE FEES------------------------------------------------------------- 8
Permit Issuance, Permit Inspection, and Plan Check Fees ------------------------------------------------------ 8
Reconstruction Fees for Work Completed by City Fees--------------------------------------------------------- 8
Franchises and License (Issuance & Annual Renewal)---------------------------------------------------------- 9
Encroachment Permit Faithful Performance Bond or Cash Deposit Requirements-----------------------10
ENVIRONMENTAL CONTROL FEES------------------------------------------------------------------------------- I I
FoodPermits------------------------------------------------------------------------------------------------------------ I I
FoodVehicles-----------------------------------------------------------------------------------------------------------I I
Non-Food----------------------------------------------------------------------------------------------------------------12
Underground Storage Tanks ------------------------------------------------------------------------------------------ 13
Hazardous Materials---------------------------------------------------------------------------------------------- ----13
WellPermits ------------------------------------------------------------------------------------------------------------- 13
Aboveground Petroleum Storage Tank Facility Permit --------------------------------------------------------- 13
FIREPREVENTION FEES-----------------------------------------------------------------------------------------------14
Fire Inspection/Re-inspection ---------------------------------------------------------------------------------------- 14
Fire Permit - Operational ---------------------------------------------------------------------------------------------- 14
Fire Permit - Construction--------------------------------------------------------------------------------------------15
Fire Protection Systems-----------------------------------------------------------------------------------------------16
FireAlarm Systems----------------------------------------------------------------------------------------------------16
PublicEducation -------------------------------------------------------------------------------------------------------- 16
State Mandated Fire Inspections ------------------------------------------------------------------------------------- 17
Other----------------------------------------------------------------------------------------------------------------------17
POLICEFEES---------------------------------------------------------------------------------------------------------------18
General-------------------------------------------------------------------------------------------------------------------18
FalseSecurity Alarms-------------------------------------------------------------------------------------------------18
Subpoenas and Discovery Motions--------------------------------------------------------------------------------- IS
City of Vernon Master Fee Schedule
K",
W11110 RWIWOW����� M
COPIES OF PUBLIC RECORDS/INFORMATION
Copies of identifiable Public Record
/ page
Certified copies of identifiable Public Record
-$0.15
$1.75 / record
SUBPOENA FEE
Safety Personnel
$275 / appearance
Miscellaneous Personnel
$150 / appearance
STAFF TIME — Special Projects Beyond Normal Course of Business
As provided for in the California Public Records Act, City's staff time spent on extraordinary or
infrequent requests that are large in scope or require development of information to satisfy such
requests will require the requestor to reimburse the City for its actual direct cost. Actual direct
cost will include the City staff s fully burdened hourly rate which includes PERS and Medicare.
Outsourced consultant and attorney fees will be at cost billed to the City. A deposit, based upon
an estimate to fulfill a request, will be collected prior to commencement.
CREDIT CARD
City's direct cost to process credit card transactions for the convenience of the credit card user
shall be collected from the credit card user as part of the transaction.
MISCELLANEOUS
Returned Checks
$20.00
OTHER
Administrative Citations
See Resolution No.
2011-195
Civil Penalties
See Resolution No.
7011 -1 Q'i
Page 3 of 18
City of Vernon Master Fee Schedule
r.M
RM M, TN
NMI$
PERMIT FEES
Building, Electrical, Plumbing, Heating,
Ventilating, Cooling,
Refrigeration, and Fire Prevention Permits
VALUATION
FEE
$1.00 to $2,000.00
$86.40
$2,001.00 to $5,000.00
$86.40 for the first $2,000.00 plus $4.32 for each,
additional $100.00 or fraction thereof, up to and
including $5,000.00
$5,001.00 to $25,000.00
$216.00 for the first $5,000.00 plus $10.80 for
each additional $1,000.00 or fraction thereof, up to
and including $25,000.00
$25,001.00 to $50,000.00
$432.00 for the first $25,000.00 plus $8.10 for
each additional $1,000.00 or fraction thereof, up to
and including $50,000.00
$50,001.00 to $100,000.00
$634.50 for the first $50,000.00 plus $5.94 for
each additional $1,000.00 or fraction thereof, up to
and including $100,000.00
$100,00 1.00 to $500,000.00
$931.50 for the first $100,000.00 plus $4.32 for
each additional $1,000.00 or fraction thereof, up to
and including $500,000.00
$500,001.00 and up
$2,659.50 for the first $500,000.00 plus $3.34 for
each additional $1,000.00 or fraction thereof.
Plan Check Fee when required, shall be equal to 65% of the Permit Fee. Plan Check
Energy Fee 25% of the Permit Fee. Permit Energy Fee 10% of the Permit Fee.
Page 4 of 18
City of Vernon Master Fee Schedule
PERMIT FEES (CONT'D)
DESCRIPTION
FEE
Green Building Standards Plan Review Mandatory Provisions
$1,020.00
Green Building Standards Plan Review Tier 1 Provisions
$2,040.00
Green Building Standards Plan Review Tier 2 Provisions
$3,060.00
Green Building Standards Inspection Mandatory Provisions
$1,000.00
Green Building Standards Inspection Tier 1 Provisions
$1,975.00
Green Building Standards Inspection Tier 2 Provisions
$2,950.00
Grading Plan Review Fee First 3 sheets
$1,035.00
Grading Plan Review Fee Each Additional Sheet
$225.00
Grading Inspection Fee
$220.00
NPDES LID Plan Review
$2,157.00
NPDES LID Inspection
$942.00
Residential Solar Panel Installation
$500.00 plus $15.00 per
kilowatt for each kilowatt
above 15kW
Commercial / Industrial Solar Panel Installation
$1,000.00 plus $7.00 per
kilowatt for each kilowatt
above 50 kw to250 kW and $5
per kilowatt for each kilowatt
above 250kW
Water Efficient Landscape Plan Review and Inspection fee
$645.00
Industrial Wastewater Discharge Permit Application Review fee
$140.00
Sani Sewer Flow Study fee
$1,640.00
Green Building Standards Administration Special Revolving fee
$1.00 for every $25,0 00 or
portion thereof of valuation
Penalty Fees
Work commencing prior to the issuance of a permit shall be subject to an additional fee equal to
the permit fee. Authorized by California Building Code § 109.4.
Page 5 of 18
City of Vernon Master Fee Schedule
CERTIFICATE OF OCCUPANCY FEES
AFFECTED FLOOR AREA
FEE
Inspection Fee
Less than 5,000 square feet
$300.00
5,001 to 50,000 square feet
$689.00
50,001 to 100,000 square feet
$815.00
Over 100,000 square feet
$940.00
Issuance of a Temporary Certificate of Occupancy
Less than 5,000 square feet
$300.00
5,001 to 50,000 square feet
$689.00
50,001 to 100,000 square feet
$815.00
Over 100,000 square feet
$940,00-
Page 6 of 18
City of Vernon Master Fee Schedule
INSPECTION AND OTHER FEES
DESCRIPTION
FEE
Permit inspection outside of normal business hours
$190.00/hr;
(minimum charge four hours)
Minimum of $760.00
Inspections for work not requiring a permit
$131.00/hr
Re -inspection fee
$131.00/hr
Additional structural plan review required by changes, additions
$250.00/hr
or revisions to the plans submitted or determination if an
existing structure can accept additional loads
Additional non-structural plan review required by changes,
$131.00/hr
additions or revisions to the plans submitted
Certified Access Specialist (CASp) Review fee
$106.00/br
Trailer Permit
$395.00/trailer
Trailer Permit for subsequent years
$395.00
Final map, parcel map, or tentative map which contains four or
$4,350.00
less parcels or lots
Final map, parcel map, or tentative map which —contains five or
$8,650.00 paid at the time of
more parcels or lots
submittal plus any County
surveyor & County Clerk
filing fees & Fish & Game
Section 711.4 fees
Conditional Use Permit
_$_12,950.00 plus applicant is
responsible for cost to retain a
consultant to prepare the
environmental document for
the project plus a 25%
administration fee, plus any
County Surveyor and County
Clerk filing fees & Fish &
Game Section 713 fees
Zoning Variance and Zoning Amendment
$8,625.00
Building Code Variance
$3,800.00
Release of Building Drawings
$50.00
Covenant and Lot Merger Review Fee
$730.00
Certificate of Compliance Fee
$790.00
Lot Line Adjustment Fee
$2,260.00
Grant/Easement Deed Review
$1,125.00
Zoning Verification
$215.00
Page 7 of 18
City of Vernon Master Fee Schedule
n,li
DESCRIPTION
FEE
PERMIT ISSUANCE FEE
$125.00
PERMIT INSPECTION AND
RATE
PLAN CHECK FEES
REGULAR TIME (7:00 A.M.-
$129.000/HR.
5:30 P.M.)
OVERTIME-FRIDAY,
$190.00/HR.
SATURDAY, SUNDAY,
HOLIDAYS AND NIGHTS (4
HRS. MINIMUM)
ANNUAL PERMIT FEE FOR
$450.00
ROUTINE MAINTENANCE
(NO STREET CUTS)
RECONSTRUCTION FEES
RATE
MINIMUM
FOR WORK COMPLETED
BY CITY
ALL OTHER DIRECT COSTS
TO THE CITY RESULTING
FROM THE PERMITEE'S
ACTIVITY, CALCULATED
AT ACTUAL COST PLUS 25%
ADMINISTRATIVE COSTS
Page 8 of 18
City of Vernon Master Fee Schedule
'..E
DESCRIPTION
ISSUANCE
ANNUAL FEE
FRANCHISES AND
LICENSES (ISSUANCE &
ANNUAL RENEWAL)
RAILROAD CROSSINGS,
$25,000.00
$2,500.00
CONVEYOR BRIDGES, AND
TUNNELS ACROSS A
STREET
RAILROAD TRACKS,
$25,000.00 FOR EACH ONE-
$2,500.00 FOR EACH
PIPELINES OR CONDUITS
HALF (1/2) MILE OR
ONE-HALF (1/2) MILE
ALONG A STREET
PORTION THEREOF
OR PORTION
THEREOF
FOR PIPELINES OR
$12,500.00
$1,250.00
CONDUITS ACROSS A
STREET OR A METERING
MANHOLE IN THE STREET
FOR BUILDING FOOTINGS
$5,000.00
$500.00
AND APPENDAGES,
TRAFFIC SENSORS, SIGNS,
MONITORING WELLS AND
ARCHITECTURAL
PROJECTIONS
The fee for any encroachment not specifically listed in the table shall be the same fee for
the most similar structure listed in the table as determined by the City.
Page 9 of 18
City of Vernon Master Fee Schedule
"' i�C i 11 T I E`lt" ,5�
{� cm y , yM 't.,
ENCROACHMENT PERMIT FAITHFUL PERFORMANCE BOND OR
CASH DEPOSIT REQUIREMENTS
The amount of an encroachment permit cash deposit, certified or cashier's check, surety bond, or
letter of credit shall be determined by multiplying the quantity of asphalt paving, concrete
paving, sidewalk, concrete curb, monuments and trench excavations proposed to be removed,
disturbed or opened by the rate shown in the table below, the sum of the totals shall establish the
minimum amount of the bond or deposit, except that in no case shall the faithful total security be
less than $5,000. Authorized by Vernon Municipal Code § 22.47.
TYPE OF WORK TO BE PERFORMED
RATE
ASPHALT PAVEMENT
$17.75/SQ. FT.
CONCRETE PAVEMENT AND DRIVEWAY
$19.75/SQ. FT.
CONCRETE SIDEWALK
$10.25/SQ. FT.
CONCRETE CURB & GUTTER
$52.50/LIN. FT.
TRENCH EXCAVATIONS
$7,500.00/EACH OPEN
EXCAVATION
MONUMENT REPLACEMENT
$3,000.00/MONUMENT
Page 10 of 18
City of Vernon Master Fee Schedule
PERMIT TYPE
FEES
FOOD PERMITS:
CATERER 1625 - ANNUAL
$283
CATERER 1625 - DAILY
$94
COMMERCIAL AGRICULTURAL OPERATION 1677
$161
COMMISSARY 1650
$577
FOOD PROCESSING 1655 : <= 2,000 S . FT.
$405
ESTABLISHMENT 1656 : > 2,000 S .FT.
$843
FOOD VENDING MACHINE BUSINESS 1644
$33/ MACHINE
FOOD WAREHOUSE 1647
$324
RESTAURANT 1622-1623 : 0-30 SEATS
$324
RESTAURANT 1622-1623 : 31 SEATS & OVER
$642
RETAIL FOOD MARKET 1611
$314
RETAIL FOOD PRODUCTION ESTABLISHMENT 1615
$314
TEMPORARY EVENT ORGANIZER 1660
$235
TEMPORARY FOOD FACILITY 1670
$91 -
FOOD VEHICLES:
MOBILE FOOD FACILITY 1638 Fruit & Ve
$175
A. WHOLE PRODUCE RFVV 1636 Packaged food
$175
MOBILE FOOD PREP UNIT (HOT TRUCK) (1635) -
ANNUAL
$430
MOBILE FOOD PREP UNIT HOT TRUCK 1635 - DAILY
$145
WHOLESALE FOOD VEHICLE 1637
$95
RETAIL FOOD VEHICLE COLD TRUCK 1634
$95
Page 11 of 18
City of Vernon Master Fee Schedule
S pp
PERMIT TYPE
7%
FEES
NON-FOOD:
GARMENT MANUFACTURING 3130
$308
LAUNDRY FACILITY
/A IF FACILITY IS NOT A VERNON BUSINESS
7822
$244
LAUNDRY VEHICLE 7823
$95 PER VEHICLE
WASTE PROCESSING FACILITY 7437
$357
WASTE TRANSFER STATION 7444
$244
WASTE COLLECTION BUSINESS 7422
$1,193
WASTE COLLECTION VEHICLE 7423
$207
WASTE COLLECTION VEHICLE YARD 7442
$260
RENDERING PLANT BUSINESS 7456
$423
RENDERING PLANT VEHICLE 7462
$207
WASTE DISPOSAL SITE 7433
$244
WATER SUPPLY UTILITY (7611)
$8 / SERVICE
CONNECTION
LIQUID WASTE PUMPING BUSINESS 7241
$207
LIQUID WASTE PUMPING VEHICLE 7244
$181
OFFAL BUSINESS 7424
$207
OFFAL VEHICLE 7425
$181
Page 12 of 18
City of Vernon Master Fee Schedule
22
FEES
PERMIT TYPE
UNDERGROUND STORAGE TANKS:
UNDERGROUND STORAGE TANK FACILITY 4110
$975 / FACILITY
ANNUAL TANK OPERATING PERMIT 4100
$637 / TANK
HAZARDOUS MATERIALS:
APPLICATION FEE
$255
HAZARDOUS MATERIALS PERMIT
CLASS A 4201
$380
CLASS B 4202
$429
CLASS C 4203
$1,590
CERTIFICATE OF CLOSURE LETTER 4252
$268
Hazardous Material Closure:
Small
$244
Medium
$488
Large
$732
Ex -large
$976
WELL PERMITS:
DRILLING A WATER WELL 7368
$505
DESTROYING OR CONVERTING AN EXISTING WATER
WELL 7369
$505
DRILLING A MONITORING WELL < 50 FT. 7365
$455
REPAIRING / MODIFYING A WELL 7371
$372
ABOVEGROUND PETROLEUM STORAGE TANK
FACILITY PERMIT
Category 4001 - >_ 1320 gallons and < 10,000 gallons
$210
Category 4002 ->_ 10,000 gallons and < 100,000 gallons
$420
Category 4003 ->_ 100,000 gallons and < 1,000,000 gallons
$800
Category 4004-> 1,000,000 gallon
$1,600
GENERAL PLAN CHECK
1-5 sheets
$426
6-10 sheets
$792
11-25 sheets
$1,036
Additional sheets
$181
Page 13 of 18
City of Vernon Master Fee Schedule
h
FIRE PREVENTION FEE
Annual Business Fire Inspection based on building size)
0 to 5,000 s . ft.
$217
5001 to 9,999 s . ft.
$248
10,000 to 24,999 s . ft.
$279
25,000 to 50,000 s . ft.
$310
50,001 to 99,999 s . ft.
$341
100,000 to 249,999 s . ft.
$372
250,000 s . ft. and greater
$403
Annual Business Fire Re -Ins ection* after 2nd re -inspection
l' re -inspection
$0
2"d re -inspection and additional inspections beyond
$322 ea.
Fire Department Permit (Required Operational Permits)
• Aerosol Products
• Combustible dust operations
• Combustible, fiber storage
• Explosives (fireworks only)
• Flammable & combustible liquids
• Hazardous materials
• High -piled storage
• Miscellaneous combustible storage
$107.00/hr.
• Ovens — industrial baking & drying
• Repair garages
• Special events (assemblies >50 people)
• Spraying and dipping
• Tents & temporary membrane structures (>400 sq. ft.)
• Waste handling
• Woodworking plants
Page 14 of 18
City of Vernon Master Fee Schedule
'. t -,3 4 d
p of k f; 'k i
T, ak1-'s1'1'���.ki ili �. ���' th;:.:
.w.
}jt `yd P �;9 ( I
.. .�.1-! r r., �'��r:�ti d'rc`r
FIRE PREVENTION
CONT'D FEE
Fire Department Permit (Required Construction Permits)
Construction permits include:
• Automatic fire -extinguishing systems
• Battery Systems
• Compressed gases
• Cryogenic fluids
• Emergency responder radio coverage system
• Fire alarm and detection systems and related equipment
• Fire pumps and related equipment
• Flammable and combustible liquids
• Hazardous materials
• Industrial ovens
• LP -gas
• Private fire hydrants
• Solar photovoltaic power systems
• Spraying or dipping
• Standpipe systems
• Temporary membrane Structures and tents
VALUATION
$1.00 to $2,000.00
$157.60
$157.60 for the first $2,000.00 plus $7.88 for each
$2,001.00 to $5,000.00
additional $100.00 or fraction thereof, up to and
including $5,000.00
$394.00 for the first $5,000.00 plus $19.70 for each
$5,001.00 to $25,000.00
additional $1,000.00 or fraction thereof, up to and
including $25,000.00
$788.00 for the first $25,000.00 plus $14.78 for
$25,001.00 to $50,000.00
each additional $1,000.00 or fraction thereof, up to
and including $50,000.00
$1157.50 for the first $50,000.00 plus $10.84 for
$50,001.00 to $100,000.00
each additional $1,000.00 or fraction thereof, up to
and including $100,000.00
$1699.50 for the first $100,000.00 plus $7.88 for
$100,001.00 to $500,000.00
each additional $1,000.00 or fraction thereof, up to
and including $500,000.00
$500,001.00 and UP
$4851.50 for the first $500,000.00 plus $6.11 for
each additional $1,000.00 or fraction thereof
Plan Check Fee when required, shall be equal to 65% of the Permit Fee.. The minimum Plan
Check Fee for Automatic Fire Sprinkler Hydraulic Calculations shall be $250.00.
Page 15 of 18
City of Vernon Master Fee Schedule
siZTZ e'0a`
FIRE PREVENTION (CONT'D) FEE
Constructions permit inspection outside of normal business hours $642.00
minimum char a four hours at a rate of $160.50 er hr.
Inspections for work not requiring a permit
$107.00/hr.
Construction and operational per mit re -inspection fee
$107.00/hr.
Additional plan review required by changes, additions or revisions to
the plans submitted
$107.00/hr.
Additional plan review required by changes, additions or revisions to
the plans submitted to the outside fire consultant
$99.00/hr.
Penalty Fees - Work commencing prior to the issuance of a construction permit shall be subject
to an additional fee equal to the construction permit fee. See California Building Code § 109.4
Fire Protection Systems
Back flush - Five yearsprinkler system testing (per system)
$150
Fire Alarm Systems
Fire alarm registration initial
$54
Fire alarm registration annual
$27
False Security Alarm no charge for the first two within a fiscal ear
3rd false security alarm with emergency response
$749
4th false security alarm with emergency response
$874
5th false security alarm with emergency response
$999
6th false security alarm with emergency response, and each additional
security alarm thereafter
$1,124
Public Education
Community Emergency Response Training (CERT) (supplies)
$0
CPR training (supplies)
$100 per person
Evacuation planning & drill
$0
Fire extinguisher training — Max. 30 students
$50/ea. session
Page 16 of 18
City of Vernon Master Fee Schedule
!!n5 PREVENTION (CONT'D)
FEE
State Mandated Fire Inspections
Apartments and schools
$161
Other Fees
After-hours fire inspection (based on 4 hour minimum)
$696
Apparatus and crew charge (hourly) — Per CAL OES State Fire
Program
$200 hr.
Fire code appeals (not refundable)
$239
Film Permit
$214
Inspection charge (special events)
$107
Standby service (4 hour minimum per man hour)
$98
Page 17 of 18
City of Vernon Master Fee Schedule
General:
Fees
Vehicle release fee - standard
$40.00
Vehicle release fee - driving under the influence
$115.00
Fee to release complete copy of arrest reports, traffic accident reports,
incident reports
$20.00
Fee to release complete copy of arrest reports, traffic accident reports,
and incident reports (certified)
$25.00
Fee to release certified traffic citation
$1.75
Repossession fee for vehicles repossessed in Vernon (Government
Code 41612)
$15.00
VIN verification fee
$35.00
Citation sign -off fee
$35.00
DUI Emergency Response
City's cost
False Security Alarms: (no charge for the first 3 within
a fiscal year)
4th false security alarm
$134.00
5th false security alarm
$165.00
6th false security alarm
$196.00
false security alarm, and each additional security alarm thereafter
$227.00
Subpoenas and Discovery Motions:
$195.00
Basic Police background investigation
$15.00
Video tape copy (blank tape provided by requester) (VHS)
$15.00
Video tape copy (blank tape provided by requester) (digital)
$15.00
Page 18 of 18
TRANSMITTAL COMMUNICATION
CITY CLERK'S OFFICE
INTEROFFICE MEMORANDUM
DATE: August 7, 2014
TO: Daniel Calleros, Police Chief
Kristen Enomoto, Deputy City Administrator
Carlos Fandino, Director of Gas & Electric
William Fox, Finance Director/City Treasurer
Leonard Grossberg, Director of Health & Environmental Control
Masami Higa, Assistant Finance Director
Alex Kung, Economic Development Manager
Joaquin Leon, Deputy City Treasurer
Teresa McAllister, Director of Human Resources
Lisette Michel, Sr. Human Resources Analyst
Hema Patel, City Attorney
Mark Whitworth, City Administrator
Michael Wilson, Fire Chief
S. Kevin Wilson, Director of Public Works, Waterl\& Development Services
FROM: Deborah Juarez, Records Management Assistant
RE: Resolution No. 2014-50 — A Resolution of the City Council of the City of Vernon
Approving and Adopting an Updated General Fee Schedule
Transmitted herewith is a copy of Resolution No. 2014-50 referenced above, which was approved by City
Council on August 5, 2014.
Thank you.
Attachment
c: Resolution No. 2014-50
STAFF REPORT
DATE: August 5, 2014
TO: Honorable Mayor and City Council
FROM: Michael A. Wilson, Fire Chief
RE: Revision to the General Fee Schedule in Exhibit A of Resolution No. 2014-42
regarding the False Security Alarm Fees
Recommendation
It is recommended that the City Council:
1. Approve a resolution to, among other things, amend Exhibit A of the City's General Fee
Schedule to remove the existing false security alarm fee for the second false alarm
response within a fiscal year. The lack of a fee for the first false alarm would continue,
and the fees for third and each subsequent false alarm response would remain unaffected.
The resolution would also find that the revision to the false security alarm fee is exempt
under the California Environmental Quality Act (CEQA) in accordance with CEQA
Guidelines Section 15061(b)(3), the general rule that CEQA only applies to projects that
may have an effect on the environment.
Background
On July 1, 2014 the City of Vernon City Council approved and adopted a city-wide General Fee
Schedule via Resolution No. 2014-42. Among other things, the General Fee Schedule included a
fee to defray a portion of the Vernon Fire Department's costs of responding to false security
alarms.' The General Fee Schedule states that Vernon is to charge nothing for the first false
security alarm within a fiscal year, with fees for each subsequent violation.
1 Vernon Municipal Code Section 114.1(r) defines False Alarm as "the wilful and knowing
initiation or transmission of a signal, message or other notification of an event of fire when no
such danger exist, or the activation of any fire alarm system due to malfunction, mechanical or
electrical defect, improper operation or procedure by any person, or a false oral, or written report
to any department of the City of Vernon that an emergency exists requiring immediate or
emergency response by the Vernon Fire Department".
The Department recommends the schedule be revised as follows:
False Security Alarm (no charge for the first two within a fiscal
ear
3rd false security alarm with emergency response
$749
4th false security alarm with emergency response
$874
5th false security alarm with emergency response
$999
6th false security alarm with emergency response,
and each additional security alarm thereafter
$1,124
The Vernon Fire Department recommends that the fee of $624 for second false alarms be deleted
to better track with the requirements of, Section 104.12 of the California Fire CodeZ which
authorizes fees of three or more false alarms per year, rather than two:
"The fire code official is authorized to assess a service charge, as set forth by resolution,
against the person owning or responsible for an alarm system when a fire department
response occurs as a result of the third false alarm at the same address or location within
any twelve month period, and for each subsequent false alarm thereafter, or against any
person who intentionally, or in violation of the law reports, or causes to be reported, a
false alarm to any department of the City of Vernon that an emergency exists requiring
immediate or emergency response by the City of Vernon Fire Department".
Fiscal Impact
The recommended action would decrease revenue to the City by approximately $20,000 in the
first year, and somewhat less in subsequent years, as the City expects some businesses will
respond to the new fees by taking actions to limit the number of false alarms.
2 This section of the Building Code was amended pursuant to Vernon Municipal Code § 7.12(b).