Resolution No. 2015-064RESOLUTION NO. 2015-64 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON ESTABLISHING A TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT FOR 2016 IN ACCORDANCE WITH VERNON'S TRANSMISSION OWNER TARIFF AND PROVIDING FOR TARIFF SHEET CHANGES TO IMPLEMENT THE ADJUSTMENT WHEREAS, the City of Vernon ("City") is a chartered municipal corporation of the State of California that owns and operates a system for the generation, purchase, transmission, distribution and sale of electric capacity and energy; and WHEREAS, the City is a Participating Transmission Owner ("PTO") with the California Independent System Operator Corporation, a California nonprofit public benefit corporation ("CAISO"); and WHEREAS, the CAISO requires a PTO to turn over operational control of its transmission facilities and entitlements to the CAISO; and WHEREAS, in return, the CAISO collects revenues for each PTO pursuant to calculations that reflect the expenses and capital costs incurred by each PTO to provide transmission services; and WHEREAS, the relationship between PTOs and CAISO is governed by a Transmission Control Agreement ("TCA") which sets forth the specific duties and obligations of all PTOs including the filing of a Transmission Owner Tariff ("TO Tariff") with the Federal Energy Regulatory Commission ("FERC"); and WHEREAS, in order to ensure that all Transmission Revenue Credits are flowed through to CAISO's open access transmission tariff ("CAISO Tariff") customers, the City annually updates its Transmission Revenue Balancing Account Adjustment ("TRBAA") by a dollar amount reflecting the proposed Transmission Revenue Credits adjusted for difference between projected and actual credits from the prior year; and WHEREAS, a Notice of Public Hearing was published on October 1, 2015, notifying all interested parties that a hearing to consider evidence to establish the City's new TRBAA for 2016 was scheduled for October 20, 201.5, at approximately 9 a.m., subject to the hearing being continued or adjourned to a stated time and place without further notice of public hearing; and WHEREAS, a Public Hearing was held on October 20, 2015, in which the City Council. took evidence from staff and those other persons in attendance who wished to be heard on the establishment of the City's new TRBAA; and WHEREAS, the Gas & Electric Department has prepared a Report, with exhibits, dated on or about October 20, 2015 ("Report"), which determines the new TRBAA for. 2016 to be consistent with the TO Tariff and supports the TRBAA and the changes to Appendix I of the TO Tariff to implement the new TRBAA effective January 1, 2016; and WHEREAS, the Gas & Electric Department has recommended that the TRBAA and Appendix I to the TO Tariff implementing the new TRBAA be approved; and WHEREAS, the City Council has heard and considered all evidence, both written and oral., presented in consideration of the establishment of the City's new TRBAA and revised Appendix I to the TO Tariff implementing the new TRBAA. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION l: The City Council of the City of Vernon hereby - 2 - finds and determines that the above recitals are true and correct. SECTION 2: The City Council of the City of Vernon finds that this action is exempt under the California Environmental Quality Act (CEQA), in accordance with Section 15061(b)(3), the general rule that CEQA only applies to projects that may have an effect on the environment. SECTION 3: The City Council of the City of Vernon hereby further finds and determines that all persons have had the opportunity to be heard or to file written comments to the proposed establishment of the City's new TRBAA and amended Appendix 1. to the TO Tariff implementing the new TRBAA, and, after due consideration of any and all evidence submitted at the public hearing, determines that there are compelling reasons to justify the establishment of the City's new TRBAA for 2016 and an amended Appendix I to the TO Tariff implementing the new TRBAA for 201.6, a copy of which is attached hereto as Exhibit A and made a part hereof. SECTION 4: The City Council of the City of Vernon hereby approves, pursuant to the TO Tariff and to be effective on January 1, 2016, the establishment of the City's new TRBAA for 2016 and revised Appendix I to the TO Tariff implementing the new TRBAA for 2016, as described in the Report, a copy of which is attached hereto as Exhibit B and made a part hereof. SECTION 5: The City Council of the City of Vernon hereby authorizes outside counsel to submit the City's new TRBAA for 2016, the revised Appendix I to the TO Tariff., and supporting documentation, such as the Report and this City Council Resolution, to FERC on behalf of the City of Vernon. - 3 - SECTION 6: The City Clerk, or Deputy City Clerk, of the City of Vernon shall certify to the passage, approval and adoption of this resolution, and the City Clerk, or Deputy City Clerk, of the City of Vernon shall cause this resolution and the City Clerk's, or Deputy City Clerk's, certification to be entered in the File of resolutions of the Council of this City. APPROVED AND ADOPTED this 20" day of. October, 2015. Name: W. Michael McCormick Title: ATTEST: Ana $ ci Ci--ty-Clerk--" % Deputy -City Clerk APPROVED AS TO FORM: Katharine Mape,�, Esq. Spiegel & McDiarmid, LLP Special Counsel to City - 4 - STATE OF CALIFORNIA ) ss COUNTY OF LOS ANGELES ) I, Ana Barcia 'Crty El�r� f Deputy City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 2015-64, was duly passed, approved and adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on Tuesday, October 20, 2015, and thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. Executed this 4 day of October, 2015, at Vernon, California. (SEAL) - 5 - s, A a Bar' City--Cl-e-I& % Deputy City Clerk APPENDIX I Transmission Revenue Requirement and TRBAA The Vernon Base Transmission Revenue Requirement is $ ;1 r390> t)'1 % and is comprised of the following components: Base TRR costs not subject to ETC Adjustment Clause: $498,480 ETC Adjustment Clause: Forecast SCE ETC Costs: $ , - `1 "' 515.-200 Balance of Difference between prior year Porecast and Actual SCE ETC Costs: Interest on Difference between prior year Forecast and Actual SCE ETC Costs: ($6.9,M � '027) The ETC Adjustment Clause is: The projected SCE ETC Cost for the next calendar year, phis the true -up (positive or negative) of the prior October through September SCE ETC Cost with interest calculated pursuant to 18 C.F.R. § 35.19a. The ETC Adjustment Clause will be recalculated annually and fled with the Commission with a proposed effective date of January I of each year. The TRBAA is a positive $1 , 58J, ; for calendar year 2011-0. Vernon's Gross Load, consistent with its TRR, used by the ISO to develop the "Transmission Access Charge is 1,181,728 MWhs. All of Vernon's transmission facilities and Entitlements placed under the ISO's Operational Control are High Voltage Facilities as defined by the ISO Tariff. The TRBAA will be recalculated annually consistent with the ISO Tariff approved by the Vernon City Council, and provided to the ISO. APPENDIX I Transmission Revenue Requirement and TR13AA The Vernon Base Transmission Revenue Requirement is $2,973,047 and is comprised of the following components: Base TRR costs not subject to ETC Adjustment Clause: $498,480 ETC Adjustment Clause: Forecast SCE ETC Costs: $2,575,200 Balance of Difference between prior year Forecast and Actual SCE ETC Costs: ($95,371) Interest on Difference between prior year Forecast and Actual SCE ETC Costs: ($5,262) The ETC Adjustment Clause is: The projected SCE ETC Cost for the next calendar year, plus the true -up (positive or negative) of the prior October through September SCE F FC Cost with interest calculated pursuant to 18 C.F.R. § 35.19a. The ETC Adjustment Clause will be recalculated annually and filed with the Commission with a proposed effective date of January I of each year. The TRBAA is a positive $411 for calendar year 2016 Vernon's Gross Load, consistent with its TRR, used by the ISO to develop the Transmission Access Charge is 1,181,728 MWhs. All of Vernon's transmission facilities and Entitlements placed under the ISO's Operational Control are High Voltage Facilities as defined by the ISO Tariff. The TRBAA will be recalculated annually consistent with the ISO Tariff approved by the Vernon City Council, and provided to the ISO. CITY OF VERNON GAS & ELECTRIC DEPARTMENT REPORT REGARDING THE ESTABLSHMENT OF A NEW TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT FOR CALENDAR YEAR 2016 October 20, 2015 The City of Vernon ("Vernon" or "City") is a Scheduling Coordinator and a Participating Transmission Owner ("PTO") in the California Independent System Operator Corporation ("ISO"). To participate in the ISO, PTOs are required to turn over administrative control of their transmission facilities and entitlements to the ISO. In return, the ISO collects revenues for each PTO pursuant to calculations that reflect the expenses and capital costs incurred by each PTO to provide transmission services. The relationship between PTOs and the ISO is governed by a Transmission Control Agreement ("TCA"), which sets forth the specific duties and obligations of all PTOs. The TCA requires all PTOs to file a Transmission Owner Tariff ("TO Tariff") with the Federal Energy Regulatory Commission ("FERC"). Pursuant to Section 5.2 of the TO Tariff, Vernon updates its Transmission Revenue Balancing Account Adjustment ("TRBAA") annually. The TRBAA is a tariff mechanism designed to ensure that all Transmission Revenue Credits ("TRCs") are flowed through to ISO open access transmission tariff ("ISO Tariff") customers via annual update filings at the FERC by PTOs. Appendix F, Schedule 3, Section 6.1(b), of the ISO Tariff describes the annual TRBAA calculation as "a dollar amount based on the projected Transmission Revenue Credits as adjusted for the true up of the prior year's difference between projected and actual credits." This Report supports the establishment of a new TRBAA based on the requirements of the TO Tariff and the ISO Tariff. SUMMARY Section 5.2 of the Vernon TO Tariff identifies the items to be reflected in the TRBAA TRBAA Report 2016 Page 2 of 5 and sets forth the procedure for revising the Transmission Revenue Balancing Account ("TRBA") on an annual basis, as follows: 5.2 Transmission Revenue Balancing Account Adjustment The Participating TO shall maintain a TRBA that will ensure that all Transmission Revenue Credits and the refunds, specified in Sections 6 and 8 of Appendix F, Schedule 3 of the ISO Tariff, flow through to transmission customers. The TRBAA shall be equal to: TRBAA = TRCF + TRCT+ I. TRCT = The balance representing the prior period difference between the projected Transmission Revenue Credits and the actual credits. TRCF = The forecast of Transmission Revenue Credits for the following calendar year. I = The interest balance for the TRBA, which shall be calculated using the interest rate pursuant to Section 35.19(a) of FERC's regulations under the Federal Power Act (18 C.F.R. § 35.19(a)). Interest shall be calculated based on the average TRBA principal balance each month, compounded quarterly. Transmission Revenue Credits ("TRCs") are defined in Section 3.12 of the current Vernon TO Tariff as follows: 3.12 Transmission Revenue Credit: The sum of all revenues received by the Participating TO from the ISO for Wheeling service. The TRBAA is based on the balance in the TRBA as of September 30 of the current year and a forecast of the TRCs expected to be received in the following year. A summary of the elements of the Vernon TRBAA proposed to be effective January 1, 2016 is shown in Exhibit 1. It shows that the balance in the Vernon TRBA as of "rRBAA Report 2016 Page 3 of 5 September 30, 2015, which reflects services rendered through June 30, 2015, is a debit of $1,446, including interest. TRCs are projected to be a credit of $1,035. Taken together, these items sum up to a TRBAA to be effective for the twelve months starting January 1, 2016 of a debit, or positive, balance of $411. All of the Vernon transmission entitlements that are reflected in Vernon's transmission rates and the TRBAA are high voltage facilities. Therefore, there is no need to allocate TRCs or other TRBAA components between high voltage and low voltage rates. CALCULATION OF THE NEW TRBAA The TRBAA is equal to the sum of: TRCF + TRCT+ I. The balance in the TRBA of a debit of $1,446 as of September 30, 2015 represents the sum of the TRCT and the I components. The TRCT Component of Vernon's TRBAA TRCT represents a balance that reflects the difference for the prior period between the projected TRCs and the actual credits. The prior period in this case is the twelve-month period starting October 1, 2014 and ending September 30, 2015, A summary of the determination of the September 30, 2015 balance in the Vernon TRBA is shown in Exhibit 2. The TRCT component reflects 1) the previously projected 2014 TRCs for Vernon of $13,331 or $1,110.92 per month, for the months October through December 2014, and 2) projected 2015 TRCs of $12,458 or $1,038.17 per month, for the months January through September 2015—both elements as reflected on Line No. 10 of Exhibit 2. Adjustments for actual payable TRCs reflecting high voltage wheeling revenues payable to the TO (i.e., Vernon) are reflected in Line 11 of Exhibit 2 and produce the under (over) collection figures for the monthly payable TRC balances reflected in Line 14 of Exhibit 2. The monthly balances are carried forward from month to month in Line 14 of Exhibit 2. Interest is calculated monthly (the I component) on the average monthly balance and is compounded quarterly into the monthly payable TRC balances pursuant to Section TRBAA Report 2016 Page 4 of 5 5.2 of the Vernon TO Tariff. The interest calculation for payable TRC balances is shown in Lines 16-20 of Exhibit 2. The TRBA balance on September 30, 2015 is shown in Line 25 of Exhibit 2. The I (Interest) Component of Vernon's TRBAA As discussed above, the I component reflects interest on payable balances and on payments for prior year TRCs. As provided in Section 5.2 of Vernon's TO Tariff, monthly interest carrying costs are calculated using the 18 C.F.R. § 35.19(a) interest rates and calculation method. These interest rates are published by FERC and reflect the prime rate values published in the Federal Reserve Bank's "Selected Interest Rates." The calculation of interest is reflected in Exhibit 2 and is included as an integral part of the calculation of the TRBA balance on September 30, 2015. It is not reflected as a separate line item in Exhibit 1. The TRCF Component of Vernon's TRBAA The TRCF component of Vernon's TRBAA stands for the forecast of TRCs for the following calendar year, in this case 2016. These forecast TRCs reflect projected wheeling revenues. Wheeling revenues, which correspond to ISO Charge Type 384, are projected to be a credit of $1,034.60, as shown in Exhibit 3. These projections are based on the accruals for services provided during the twelve- month period ending June 30, 2015, which are reflected in the ISO's invoices to Vernon through September 30, 2015. A summary of the monthly accruals for the twelve months ending September 30, 2015 is shown in Exhibit 4. TRBAA Report 2016 Page 5 of 5 RECOMMENDATIONS 1. Approve the newly calculated TRBAA of a positive $411, 2. Approve replacing the existing TRBAA of positive $12,458 with the new TRBAA for 2016 of a positive $411. 3. Approve the attached revised Appendix I of Vernon's TO Tariff reflecting the TRBAA of positive $411. 4. Authorize outside counsel to submit Vernon's TRBAA and supporting documentation, such as this Report and the City Council Resolution approving the new TRBAA to FERC. �7:1 : ��I TRBAA Report 2016 Exhibit 1 CITY OF VERNON TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT (TRBAA) CALENDAR YEAR 2016 DESCRIPTION Balance in TRBA on September 30, 2015 including interest Forecast Transmission Revenue Credits Source: Line 9 Exhibit 2, Column N, Line No.25. Line 12 Exhibit 3, Column E, Line No.23. TOTAL $1,446 ($1, 035) $411 C��a e'w m F J7U O a ago n �r A 1 N n r„ win via m a M �S L0 a 'S TRBAA Report 2016 Exhibit 3 MONTH January-16 February-16 March-16 April-16 May-16 June-16 July-16 August-16 September-16 October-16 November-16 December-16 CITY OF VERNON FORECAST TRANSMISSION CREDITS for Calendar Year 2016 TRBAA Wheelina ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) 8($ 6.22) Total ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) ($86 22) ($86.22) ($86.22) ($86.22) ($86.22) ($86.22) Total ($1,034.60) ($1,034.60) i TRBAA Report 2016 Exhibit 4 Vernon Historical Transmission Credits for Calendar Year 2016 TRBAA Wheeling Revenues ISO INVOICE Month CT 384 Final Adjustments Total July-14 ($70.83) $ (34.79) ($105.63) August-14 ($75.72) ($4.96) ($80,68) September-14 ($48.74) $9.21 ($39.53) October-14 ($2.24) $16.61 $14.37 November-14 ($3.91) $2.60 ($1.32) December-14 ($28.77) $3.20 ($25.57) January-15 ($66.34) ($5,37) ($71.71) February-15 ($26.70) $2.26 ($24.44) March-15 ($80.72) $0,00 ($80.72) April-15 ($115.54) ($20.95) ($136.49) May-15 ($309.60) ($32.55) ($342.15) June-15 ($142.81) $2.08 ($140.73) ! Mot". �l W.1, I I MIT ol", � CITY CLERK'S OFFICE INTEROFFICE MEMORANDUM DATE: October 26, 2015 TO: Carlos Fandino, Director of Gas & Electric FROM: Deborah Juarez, Records Management Assistant �f RE: Resolution No. 2015-64 — A Resolution of the City Council of the City of Vernon Establishing a Transmission Revenue Balancing Account Adjustment for 2016 in Accordance with Vernon's Transmission Owner Tariff and Providing for Tariff Sheet Changes to Implement the Adjustment Transmitted herewith is a certified copy of Resolution No. 2015-64 referenced above, which was approved by City Council on October 20, 2015, and an original notarized affidavit of Carlos R. Fandino Jr. for your transmittal to the appropriate party. Please ensure that a copy of the transmittal communication is sent to my attention for the file. Thank you. Enclosures Abraham Alemu Resolution No. 2015-64 CERTIFICATE STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES) I, Ana Barcia, Deputy City Clerk of the City of Vernon, County of Los Angeles, State of California, hereby certify that the attached is a full and complete copy of: RESOLUTION NO. 2015-64 - A Resolution of the City Council of the City of Vernon Establishing a Transmission Revenue Balancing Account Adjustment for 2016 in Accordance with Vernon's Transmission Owner Tariff and Providing for Tariff Sheet Changes to Implement the Adjustment IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official Seal of the City of Vernon, County of Los Angeles, State of California, on this 2 day of October 2015. SEAL: Ana Ba mi Deputy City Cle-rk AFFIDAVIT OF CARLOS R. FANDINO JR. STATE OF CALIFORNIA ss. COUNTY OF LOS ANGELES Carlos R. Fandino, Jr., being duly sworn, deposes and states that he is the Director of the Vernon Gas and Electric Department; that the "City of Vernon Gas and Electric Department Staff Report Regarding the Establishment of a New Transmission Revenue Balancing Account Adjustment for Calendar Year 2016," including Exhibit 1 through 4 that are part of that Report, were prepared under his supervision; that the report and exhibits are correct to the best of his knowledge, information, and belief; and that he presented this report to the Vernon City Council as the basis for the Transmission Revenue Balancing Account Adjustment and Transmission Owner Tariff Appendix I Amendment that is being filed by Vernon at the Federal Energy Regulatory Commission. 6. 10/21 /2015 Carlos R. Fandi o, Jr. Date ACKNOWLEDGMENT A notary public or other officer completing this certificate verities only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California) County of Los Angeles) On October 21, 2015 before me Marisol Trujillo Notary Public (insert name and title of the officer) personally appeared Carlos R. Fandino Jr who proved to me on the basis of satisfactory evidence to be the person(s} whose name(} Ware subscribed to the within instrument and acknowledged to me that hetsheithey executed the same in histlrerftheir authorized capacity(ies) and that by hisfffmft heir signature(s}on the instrument the personfs, or the entity upon behalf of which the person(s) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. MARIsoL TRUJILLo Commission # 2093319 Notary Public - California z ( ® Los Angeles County n My Comm. Expires Doc 23, 2013 Signah— I� - a, s e h ,i Of vsq � l r� x , _ ... STAFF E T ii I �ln � , - LI i��RN®N GAS & ELECTRIC DEPARTMENT DATE: October 20, 2015 TO: Honorable Mayor and City Council FROM: Carlos Fandino Jr., Director of Vernon Gas & Electric Department Originator: Abraham Alemu, Electric Resource Planning & llevelo meat Manager jointly with Spiegel & McDiarmid, Outside Counsel RE: Establishment of New Transmission Revenue Requirement (TRR) Associated with Vernon's High Voltage Entitlements ("TRR Report") Recommendation A. Find that the establishment of a new Transmission Revenue Requirement (TRR) associated with Vernon's high voltage entitlements is exempt under the California Environmental Quality Act (CEQA) in accordance with Section 15061(b)(3), the general rule that CEQA only applies to projects that may have an effect on the environment; and B. Conduct a Public Hearing; and C. Approve the attached Resolution, pursuant to the Transmission Owner Tariff, to be effective on January 1, 2016, for the establishment of the City's new TRR Transmission Revenue Requirement (TRR) and Appendix I to the TO Tariff implementing the new TRR, as described in the Gas & Electric TRR Report dated on or about October 20, 2015; and D. Authorize outside counsel to submit the City's TRR, the amended Appendix I to the Vernon TO Tariff, and supporting documentation such as the TRR Report, to the Federal Energy Regulatory Commission (FERC) on behalf of the City of Vernon. Background The City of Vernon ("Vernon" or "City") is a Scheduling Coordinator and a Participating Transmission Owner ("PTO") in the California Independent System Operator Corporation (`ISO"). To participate in the ISO, PTOs are required to turn over administrative control of their transmission facilities and entitlements to the ISO. In return, the ISO collects revenues for each PTO pursuant to calculations that reflect the expenses and capital costs incurred by each PTO to Page 1 of 2 provide transmission services. These calculations are known as Transmission Revenue Requirements ("TRRs"). The relationship between PTOs and the ISO is governed by a Transmission Control Agreement ("TCA"), which sets forth specific duties and obligations of all PTOs. The TCA requires all PTOs to file a Transmission Owner Tariff ("TO Tariff') and TRR with the Federal Energy Regulatory Commission ("FERC"). The TCA further requires all PTOs to file any changes in their TRRs with FERC. Each PTO must also include in its TO Tariff its Gross Load which the ISO uses to calculate its grid -wide Transmission Access Charge ("TAC") rates, and which is related to the City's ability to recover its full TRR. TRANSMISSION REVENUE REQUIREMENT At present, the City's high voltage transmission assets consist of three long-term contracts (known as "existing transmission contracts" or "ETCs") which provide the City with dedicated access to high voltage transmission facilities owned by other entities. Specifically, the City has contractual entitlements to utilize transmission assets pursuant to one long-term transmission contract with the Los Angeles Department of Water and Power ("LADWP") and two long-term transmission contracts with Southern California Edison ('SCE"). The ETCs with SCE consist of one (the "SCE Victorville-Lugo ETC" described in SCE's FERC Rate Schedule 360) providing 11 MW of transmission capacity along the path between the Victorville-Lugo midpoint and the point of interconnection with the City's internal transmission system (the "City Gate"), and one (the "SCE Mead ETC" described in SCE's FERC Rate Schedule 207) providing 26 MW of transmission capacity along the path between the Mead 230 substation and the City Gate. The costs of these F,TCs make up the majority of the costs recovered through the City's TRR. Until recently, for each of the ETCs, the City paid the owner of the transmission facilities a fixed rate which was specific to the transmission path provided under each ETC. The attached TRR Report supports the establishment of a new transmission revenue requirement associated with Vernon's high voltage entitlements. Fiscal Impact The cost of Existing Transmission Service Contracts (ETC) incurred by the City will be recovered. Attachment(s) 1. City of Vernon Notice of Public Hearing to establish New Transmission Revenue Requirement Page 2 of 2 o` >�1 4 4305 Santa Fe Avenue City of Vernon y Vernon, CA 90058 (323) 583-8811 4 S��'£lY 1N9J NOTICE OF TWO SEPARATE PIJ13LIC HEARINGS The City Council of the City of Vernon will conduct two public hearings, which you may attend. PLACE: Vernon City Hall City Council Chambers 4305 Santa Fe Avenue Vernon, CA 90058 DATE & Tuesday, October 20, 2015 at 9:00 a.m. TIME: (or as soon thereafter as the matter can be heard) SU13JECTS: (1) To consider evidence to establish Vernon's new Transmission Revenue Balancing Account Adjustment for its high voltage (over 200 I(V) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff, and (2) To consider evidence to establish Vernon's new Existing Transmission Contract Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff. REQUEST: All parties are invited to be present and to submit statements orally or in writing beforc or during the applicable public hearing REVIEW OF Subject documents are available for inspection by the public at THE FILE: Vernon City Ilall, City Clerk Department, 4305 Santa Fe Avenue, Vernon, California 90058, Monday through Thursday, 7:00 a.m. to 5:30 p.m. and on the City'swebsiteat. htt�;/4e�����iuflcinon.gi«'�u�arnment�hublic_ n7c�un,�/�[y c�unul PROPOSED Staff plans to recommend that the Vernon City Council cletermine CEQA that the proposals will not have a significant effect on the environment and FINDING: are exempt from the California Environmental Quality Act (CEQA) If you desire to challenge the actions taken by the City Council or any portion thereof in court, YOU may be limited to raising only those issues you or someone else raised at the applicable hearings described in this notice or in written correspondence delivered to the City of Vernon during, or before, the hearings. The hearings may be continued or adjourned or cancelled and rescheduled to a stated time and place without further official notice of the public hearings. Dated: / I I- / L L�/L, -- — Jr., Director of Veq¢kn Gas & Electric