Resolution No. 2018-035RESOLUTION NO. 2018-35 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON ADOPTING A NEW TRANSMISSION REVENUE REQUIREMENT FOR 2019 IN ACCORDANCE WITH VERNON'S TRANSMISSION OWNER TARIFF AND PROVIDING FOR TARIFF SHEET CHANGES TO IMPLEMENT THE ADJUSTMENT WHEREAS, the City of Vernon ("City") is a chartered municipal corporation of the State of California that owns and operates a system for the generation, purchase, transmission, distribution and sale of electric capacity and energy; and WHEREAS, the City is a Participating Transmission Owner ("PTO") with the California Independent System Operator Corporation ("ISO"), and the Federal Energy Regulatory Commission ("FERC") has approved its existing Transmission Owner Tariff ("TO Tariff"); and WHEREAS, the ISO reimburses the City according to the City's current Transmission Revenue Requirement ("TRR") in return for the City turning over to the ISO the operation and control of the City's transmission entitlements; and WHEREAS, each PTO must include in its TO Tariff its Gross Load, which the ISO uses to calculate its grid -wide Transmission Access Charge ("TAC") rates, and which is related to the City's ability to recover its full TRR; and WHEREAS, the City's transmission entitlements include rights under certain contracts (each an "ETC") including (i) an agreement with the City of Los Angeles Department of Water and Power entitled "Los Angeles -Vernon Adelanto-Victorville-Lugo Firm Transmission Service Agreement" (the "LAWDP ETC"); (ii) an agreement with Southern California Edison Company ("SCE") entitled "Amended and Restated Edison -Vernon Victorville-Lugo Firm Transmission Service Agreement" (the "SCE Victorville-Lugo ETC"); and (iii) an agreement with SCE entitled "Amended and Restated Edison -Vernon Mead Firm Transmission Services Agreement" (the "SCE Mead ETC"); and WHEREAS, the City's costs under the LADWP ETC, the SCE Victorville-Lugo ETC, and the SCE Mead ETC have traditionally been based upon a negotiated fixed "path -specific" rate charged by LADWP or SCE, based on the actual costs of the specific transmission lines made available under each ETC, multiplied by the amount of transmission capacity guaranteed to the City under each ETC; and WHEREAS, on August 1, 2008, SCE filed a petition with FERC seeking to amend the pricing structure under the SCE Victorville-Lugo ETC and the SCE Mead ETC to replace the negotiated path -specific rates set forth in those ETCs with a "postage -stamp" rate which reflects the blended rate SCE charges to the ISO for the actual usage of all of SCE's transmission lines by customers of the ISO; and WHEREAS, the postage -stamp rate which SCE charges to the ISO is derived from SCE's TRR and, therefore, will change each time SCE amends its TRR; and WHEREAS, on September 30, 2008, FERC accepted, subject to refund and hearing and settlement procedures, SCE's proposed revisions under the SCE Victorville-Lugo ETC and the SCE Mead ETC to replace the negotiated path -specific rates set forth in those ETCs with a postage - stamp rate, and thus the City's costs under the SCE Victorville-Lugo ETC and the SCE Mead ETC will vary proportionately with any changes in SCE's TRR; and WHEREAS, the City reached a settlement agreement (the "SCE Settlement") with SCE to amend the SCE Victorville-Lugo ETC and the SCE - 2 - Mead ETC to replace the path -specific rates set forth in those ETCs with SCE's postage -stamp rate after a phase -in period that began on August 1, 2009, during which the City's path -specific rates in those ETCs are gradually stepped -up over three years (the "Phase -In Rates") until the path -specific rates are equal to SCE's postage -stamp rate as of January 1, 2013; and WHEREAS, under the SCE Settlement, the City's costs for the SCE Victorville-Lugo ETC and the SCE Mead ETC are equal to (i) from August 1, 2009, until December 31, 2012, the Phase -In Rates, and beginning on January 1, 2013, the SCE postage -stamp rate, in each case multiplied by (ii) the amount of transmission capacity guaranteed to the City under each ETC; and WHEREAS, FERC approved the SCE Settlement pursuant to an order issued September 11, 2009, 128 FERC ¶ 61,237 (2009), in FERC Docket Nos. ER08-1343-000, ER08-1353-000, ER09-187-000, ER09-187-001, EL09-19-000, and ER09-446-000 ("SCE Settlement Order"); and WHEREAS, on behalf of the City, the Brattle Group, an experienced utilities consulting firm, developed a tracking mechanism for the City's TRR ("TRR Tracking Mechanism") to allow the City's TRR to be adjusted annually, effective January 1 of each year, to reflect changes in the City's costs under the SCE Victorville-Lugo ETC and the SCE Mead ETC that change as a result of (i) the stepped -up rates implemented between August 1, 2009 and December 31, 2012; or (ii) any change in SCE's TRR on or after January 1, 2013; and WHEREAS, on the basis of The Brattle Group's analysis and evidence from City staff, which was considered during a public meeting of the City Council held on July 13, 2009, the City, on July 15, 2009 ("July 15 FERC Filing"), filed with FERC proposed revisions to its TO - 3 - Tariff proposing stated TRRs for each of the years 2010 to 2012, which dollar amounts were also included in the SCE Settlement ("TO Tariff Revisions"); and WHEREAS, the City also submitted in the July 15 FERC Filing a request to utilize an "ETC Adjustment Clause" to adjust automatically each year the costs the City incurs attributable to any changes in SCE's TRR associated with SCE's High Voltage Existing Contracts Access Charge ("HVECAC") rate; and WHEREAS, FERC approved the City's request to utilize an ETC Adjustment Clause to reflect annual projected changes to SCE's TRR, in an order issued September 11, 2009, 128 FERC 61,235 (2009), in FERC Docket No. EL09-64-000 ("TO Tariff Order"); and WHEREAS, under the TO Tariff Order, the City's TO Tariff revisions went into effect on August 1, 2009; and WHEREAS, on January 6, 2015, the City approved revisions to the template used to calculate the annual ETC Adjustment Clause; and WHEREAS, on April 8, 2015, FERC approved the City's 2015 filing with FERC reflecting modifications to the base TRR as calculated using the revised ETC Adjustment Clause template; and WHEREAS, on October 24, 2017, the City approved revisions to the Gross Load included in the City's TO Tariff that updated the Gross Load to be based on 2016 load data, rather than 2010 load data; and WHEREAS, on December 8, 2017, FERC approved the City's 2017 filing with FERC reflecting revisions to the Gross Load included in the City's TO Tariff; and WHEREAS, the City is required under the TO Tariff Order to submit annual filings with FERC reflecting modifications to the base TRR; and - 4 - WHEREAS, a Notice of Public Hearing was published on September 20, 2018, notifying all interested parties that a hearing to consider evidence to establish the City's new TRR was scheduled for October 16, 2018, at approximately 9:00 a.m., subject to the hearing being continued or adjourned to a stated time and place without further notice of public hearing; and WHEREAS, on October 16, 2018, the City Council held a Public Hearing in which the City Council took evidence from staff and those other persons in attendance who wished to be heard on the calculation of the City's new TRR; and WHEREAS, the TRR for 2019 is shown in the amended Appendix I to the TO Tariff, a copy of which is attached hereto as Exhibit A and made a part hereof. WHEREAS, the Public Utilities Department has prepared a Report, dated October 16, 2018, with exhibits, a copy of which is attached hereto as Exhibit B and made a part hereof, which reiterates its previous conclusions that the TRR and ETC Adjustment Clause mechanism developed by The Brattle Group, approved by FERC under the amended TO Tariff, and revised in 2015 are reasonable and which calculates the amount derived under the ETC Adjustment Clause for 2019; and WHEREAS, the Public Utilities Department has recommended the City adopt the TRR shown in the amended Appendix I to the TO Tariff, attached as Exhibit A, to be effective on January 1, 2019; and WHEREAS, the City Council has heard and considered all evidence, written and oral, presented in consideration of the establishment of the City's new TRR. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE - 5 - CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon finds that this action does not constitute a "project" pursuant to section 15378(b)(2) of the Guidelines to the California Environmental Quality Act ("CEQA"), because such action constitutes an administrative activity; and even if the adoption of the proposed item did constitute a project, it would be exempt in accordance with CEQA Guidelines section 15061(b)(3), the general rule that CEQA only applies to projects that may have an effect on the environment. SECTION 3: The City Council of the City of Vernon hereby further finds and determines that all persons have had the opportunity to be heard or to file written comments to the proposed adoption of the City's TRR, and after due consideration of any and all evidence submitted at the Public Hearing, determines there are compelling reasons to justify the adoption of the City's TRR, to be effective January 1, 2019. SECTION 4: The City Council of the City of Vernon hereby declares that: (a) any determination made pursuant to this Resolution regarding the validity or reasonableness of any portion of any TRR or TO Tariff shall apply only prospectively from the date of this Resolution; and (b) in no way shall this Resolution affect the City Council's adoption or determination of any previous TRR or TO Tariff. SECTION 5: The City Council of the City of Vernon hereby - 6 - approves, pursuant to the TO Tariff and to be effective on January 1, 2019, the.establishment of the City's new TRR and Appendix I to the TO Tariff implementing the new TRR, as described in the Public Utilities Department Report dated October 16, 2018. SECTION 6: The City Council of the City of Vernon hereby authorizes outside counsel to submit the City's TRR, the amended Appendix I to the Vernon TO Tariff, and supporting documentation, such as the Report, and this City Council Resolution approving the new TRR, to FERC on behalf of the City of Vernon. SECTION 7: The City Clerk of the City of Vernon shall certify to the passage, approval and adoption of this resolution, and the City Clerk of the City of Vernon shall cause this resolution and the City Clerk's certification to be entered in the File of resolutions of the Council of this City. APPROVED AND ADOPTED this 16th day of October, 2018. Name: Yvette Woodruff -Perez ATTEST: Mari E. Ayala, City Clerk APPROVED AS TO FORM: Katharine Mapes, Esq. Spiegel & McDiarmid, LLP Special Counsel to City Title: Mavor - 7 - STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, Maria E. Ayala, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. 2018-35, was duly passed, approved and adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on October 16, 2018, and thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. Executed this Viay of October, 2018, at Vernon, California. (SEAL) Mari E. Ayala, City Clerk - 8 - EXHIBIT A APPENDIX I Transmission Revenue Requirement and TRBAA The Vernon Base Transmission Revenue Requirement is $.2,446,805 and is comprised of the following components: Base TRR costs not subject to ETC Adjustment Clause: $498,480 ETC Adjustment Clause: Forecast SCE ETC Costs: $02,388.720 Balance of Difference between prior year Forecast and Actual SCE ETC Costs: (417 712 Interest on Difference between prior year Forecast and Actual SCE ETC Costs: ($?2,683) The ETC Adjustment Clause is: The projected SCE ETC Cost for the next calendar year, plus the true -up (positive or negative) of the prior October through September SCE ETC Cost with interest calculated pursuant to 18 C.F.R. § 35.19a. The ETC Adjustment Clause will be recalculated annually and filed with the Commission with a proposed effective date of January 1 of each year. The TRBAA is a negative $� 176 for calendar year 2012. Vernon's Gross Load, consistent with its TRR, used by the ISO to develop the Transmission Access Charge is 1,154,492 MWhs. All of Vernon's transmission facilities and Entitlements placed under the ISO's Operational Control are High Voltage Facilities as defined by the ISO Tariff. The TRBAA will be recalculated annually consistent with the ISO Tariff approved by the Vernon City Council, and provided to the ISO. Delete Delete Delete Delete Delete APPENDIX I Transmission Revenue Requirement and TRBAA The Vernon Base Transmission Revenue Requirement is $2,446,805 and is comprised of the following components: Base TRR costs not subject to ETC Adjustment Clause: $498,480 ETC Adjustment Clause: Forecast SCE ETC Costs: $2,388,720 Balance of Difference between prior year Forecast and Actual SCE ETC Costs: ($417,712) Interest on Difference between prior year Forecast and Actual SCE ETC Costs: ($22,683) The ETC Adjustment Clause is: The projected SCE ETC Cost for the next calendar year, plus the true -up (positive or negative) of the prior October through September SCE ETC Cost with interest calculated pursuant to 18 C.F.R. § 35.19a. The ETC Adjustment Clause will be recalculated annually and filed with the Commission with a proposed effective date of January 1 of each year. The TRBAA is a negative $21,176 for calendar year 2019. Vernon's Gross Load, consistent with its TRR, used by the ISO to develop the Transmission Access Charge is 1,154,492 MWhs. All of Vernon's transmission facilities and Entitlements placed under the ISO's Operational Control are High Voltage Facilities as defined by the ISO Tariff. The TRBAA will be recalculated annually consistent with the ISO Tariff approved by the Vernon City Council, and provided to the ISO. EXHIBIT B CITY OF VERNON PUBLIC UTILITIES DEPARTMENT REPORT REGARDING THE ESTABLISHMENT OF A REVISED NEW TRANSMISSION REVENUE REQUIREMENT ASSOCIATED WITH VERNON'S HIGH VOLTAGE ENTITLEMENTS October 16, 2018 The City of Vernon ("Vernon" or "City") is a Scheduling Coordinator and a Participating Transmission Owner ("PTO") in the California Independent System Operator Corporation ("ISO"). To participate in the ISO, PTOs are required to turn over administrative control of their transmission facilities and entitlements to the ISO. In return, the ISO collects revenues for each PTO pursuant to calculations that reflect the expenses and capital costs incurred by each PTO to provide transmission services. These calculations are known as Transmission Revenue Requirements ("T R Rs") . The relationship between PTOs and the ISO is governed by a Transmission Control Agreement ("TCA"), which sets forth specific duties and obligations of all PTOs. The TCA requires all PTOs to file a Transmission Owner Tariff ("TO Tariff") and TRR with the Federal Energy Regulatory Commission ("FERC"). The TCA further requires all PTOs to file any changes in their TRRs with FERC. Each PTO must also include in its TO Tariff its Gross Load which the ISO uses to calculate its grid -wide Transmission Access Charge (" TAC") rates, and which is related to the City's ability to recover its full TRR. TRANSMISSION REVENUE REQUIREMENT At present, the City's high voltage transmission assets consist of three long-term contracts (known as "existing transmission contracts" or "ETCs") which provide the City with dedicated access to high voltage transmission facilities owned by other entities. Specifically, the City has contractual entitlements to utilize transmission assets pursuant to one long-term transmission contract with the Los Angeles Department of Water and Power ("LADWP") and two long-term transmission contracts with Southern California Edison ("SCE"). The ETCs with SCE consist of one (the "SCE Victorville-Lugo ETC" described in SCE's FERC Rate Schedule 360) TRR Report 2019 Page 2 of 6 providing 11 MW of transmission capacity along the path between the Victorville- Lugo midpoint and the point of interconnection with the City's internal transmission system (the "City Gate"), and one (the "SCE Mead ETC" described in SCE's FERC Rate Schedule 207) providing 26 MW of transmission capacity along the path between the Mead 230 substation and the City Gate. The costs of these ETCs make up the majority of the costs recovered through the City's TRR. Until recently, for each of the ETCs, the City paid the owner of the transmission facilities a fixed rate which was specific to the transmission path provided under each ETC. On August 1, 2008, SCE proposed to increase its TRR and associated rates in FERC Docket No. ER08-1343-000. In a related filing submitted in FERC Docket No. ER08-1353-000, SCE proposed to transition both of its ETCs with Vernon from their current, fixed "path -specific" rates to a so-called "postage stamp" rate methodology which reflects the blended rate which SCE charges the ISO pursuant to its own TRRs for the actual usage of all of SCE's transmission facilities by customers of the ISO (the "HVECAC Rate"). The HVECAC Rate that SCE proposed in its TO Tariff is derived from SCE's TRR and, therefore, will change each time SCE amends its TRR. On September 30, 2008, FERC accepted, subject to refund and hearing and settlement procedures, SCE's proposed revisions to its TO Tariff to transition the negotiated path -specific rates set forth in the SCE Victorville-Lugo ETC and the SCE Mead ETC to the uniform HVECAC Rate, and thus the City's costs under those ETCs will vary proportionately with any changes in SCE's TRR. The City reached a settlement agreement (the "SCE Settlement") with SCE to amend the SCE Victorville-Lugo ETC and the SCE Mead ETC to fully transition the path -specific rates set forth in those ETCs to SCE's HVECAC Rate after a phase -in period that began on August 1, 2009, during which the City's path -specific rates in those ETCs have been gradually stepped -up under incrementally increasing fixed TRR Report 2019 Page 3 of 6 rates (the "Phase -In Rates") until the path -specific rates are equal to the HVECAC Rate as of January 1, 2013. FERC approved the SCE Settlement pursuant to an order issued September 11, 2009, 128 FERC ¶ 61, 237 (2009), in FERC Docket Nos. ER08-1343-000, ER08-1353-000, ER09-187-000, ER09-187-001, EL09-19- 000, and ER09-446-000 ("SCE Settlement Order"). On behalf of the City, The Brattle Group, an experienced utilities consulting firm, developed a TRR tracking mechanism clause for the City's TRR ("ETC Adjustment Clause"), which allows the City's TRR to be adjusted annually, effective January 1 of each year, to reflect changes in the City's transmission expenses associated with any changes implemented by SCE in the HVECAC Rate associated with the SCE Victorville-Lugo ETC and the SCE Mead ETC. On the basis of The Brattle Group's analysis and evidence from City staff, which was considered during a public meeting of the City Council held on July 13, 2009, the City, on July 15, 2009 ("July 15 FERC Filing"), filed with FERC the proposed (i) revisions to its TO Tariff proposing the City's stated TRRs for each of the years 2010 to 2012, which dollar amounts were also included in the SCE Settlement ("TO Tariff Revisions") and (ii) the ETC Adjustment Clause tracking mechanism. The July 15 FERC Filing acknowledged that, to the extent that the SCE Settlement was accepted, because the stated Phase -In Rates would be fixed, the ETC Adjustment Clause for the term of the Phase -In Rates would be zero FERC approved the City's July 15 FERC Filing, including the TO Tariff Revisions, the City's proposed calculations of the TRR for years 2010 to 2012, and the City's request to utilize an ETC Adjustment Clause, in an order issued September 11, 2009, 128 FERC ¶ 61,235 (2009), in FERC Docket No. EL09-64-000 ("TO Tariff Order"). The City is required under the TO Tariff Order to submit annual filings each year with FERC reflecting annual modifications to the base TRR of the City. In January 2015, the City approved revisions to the template used to calculate the TRR Report 2019 Page 4 of 6 ETC Adjustment Clause and submitted these revisions to FERC. On April 8, 2015, FERC approved the City's 2015 TRR filing as calculated using the revised ETC Adjustment Clause template; the City has prepared this year's filing using that revised template. CALCULATION OF THE ETC ADJUSTMENT CLAUSE Section 5.3 of the Vernon TO Tariff identifies the items to be reflected in the ETC Adjustment. The ETC Adjustment Clause shall be calculated as: ETC Adjustment = ETCCF+ ETCCT+ I ETCCF = The forecast of SCE ETC Cost for the following calendar year ETCCT = The balance representing the prior period difference between the projected cost of the SCE ETCs ("SCE ETC Cost") and the actual cost. I = The interest balance for the ETC, which shall be calculated using the interest rate pursuant to Section 35.19(a) of FERC's regulations under the Federal Power Act (18 C.F.R. 35.19(a)). Interest shall be calculated based on the average ETC true -up balance each month, compounded quarterly. A summary of the elements of the Vernon ETC Adjustment Clause proposed to be effective January 1, 2019 is shown in Exhibit 1. The ETC Adjustment Clause to be effective for the twelve months starting January 1, 2019 is $1,948,325. The ETCCF Component The ETCCF component stands for the forecast of SCE ETC costs for the following calendar year, in this case 2019. These forecast SCE ETC costs reflect 2019 rates from Southern California Edison Company's draft FERC Filing, posted on its website pursuant to its formula rate protocols (approved in FERC Docket No. ER11-3697). That filing is scheduled to be made at FERC, in its final form, in December 2018; Vernon will true up any differences in its SCE ETC costs when it makes its 2020 TRR Report 2019 Page 5 of 6 TRR filing. The ETCCF for 2018 SCE ETC costs are projected to be $2,388,720 as shown in line 8 of Exhibit 1. The ETCCT Component ETCCT represents a balance that reflects the difference between prior year forecast and actual SCE ETC costs. The prior period in this case is the twelve-month period starting October 1, 2017 and ending September 30, 2018. A summary of the determination of the September 30, 2018 balance in the ETC Adjustment Clause is shown in Exhibit 1. The ETCCT component reflects 1) the previously projected 2016 SCE ETC costs of $225,700 per month, for the months October through December 2017 and projected 2018 SCE ETC costs of $230,510 per month, for the months January through September 2018, 2) actual 2017 SCE ETC costs of $ 20,9420 per month, for the months October through December 2017 and $227,920 per month, for the months January through September 2018, and 3) refunds received by the City —all elements as reflected on Line No. 8, 15, and 16 of Exhibit 1. The net of these elements produce the under (or over) collection figures reflected in Line 17 of Exhibit 1. The ending balance is the sum of the beginning balance on October 1 and the (over)/under collection — both elements as reflected on Line 1 and 17 of Exhibit 1. The cumulative monthly balances are carried forward from month to month and the ETCCT component on September 30, 2018 of negative $417,712 is shown in line 19 of Exhibit 1. The I (Interest) Component The Interest component reflects interest on the difference between prior year forecast and actual SCE ETC costs. The monthly interest carrying costs are calculated using the 18 C.F.R. § 35.19(a) interest rates and calculation method. These interest rates are published by FERC and reflect the prime rate values published in the Federal Reserve Bank's "Selected Interest Rates." TRR Report 2019 Page 6 of 6 Interest is calculated monthly on the average cumulative monthly balance and is compounded quarterly. The interest component is negative $22,683, as shown in Lines 20-24 of Exhibit 1. RECOMMENDATIONS 1. Approve the establishment of the City's revised new TRR for 2019 and revised Appendix I to the TO Tariff. 2. Authorize outside counsel to submit the City's TRR, ETC Adjustment Clause amount, the revised Appendix I to the TO Tariff, and this City Council Resolution approving the TRR and ETC Adjustment Clause amount to FERC on behalf of the City of Vernon. s z° o" ..... ........... __...... E ...._. ...... m m ._... {I m �I r m _ $ o {I __.._ g $ - e .... ........ _ x 16 m16 m^'- — .. n a' Jw 16ct N $ r E NI o 16 m a m I Iry Iry o - At a .mi m JIn 9u a a' - - $ $'� 16 m m 16 n r a m 16 m $. F = m n 16 m {{ff S $ OX m m 14 16 m g� g N $� i ci E m - - E Id 8� 8 m 2 $I o 1 g Ci 6 — z° m 0 i E _ r — T�i u n A t m Z 8 i ? 'o ' c c Qa m ^ v� m u m z �.+ d�a w TRANSMITTAL COMMUNICATION CITY CLERK'S OFFICE INTEROFFICE MEMORANDUM DATE: October 24, 2018 TO: Kelly Nguyen, General Manager of Public Utilities FROM: Deborah Juarez, Records Management Assistant G � N ;) RE: Resolution No. 2018-35 — A Resolution of the City Council of the City of Vernon Adopting a New Transmission Revenue Requirement for 2019 in Accordance with Vernon's Transmission Owner Tariff and Providing for Tariff Sheet Changes to Implement the Adjustment Transmitted herewith is a certified copy of Resolution No. 2018-35 referenced above, for your transmittal, which was approved by City Council on October 16, 2018. Please ensure that a copy of the transmittal communication is sent to my attention for the file. Thank you. Enclosure c: Abraham Alemu Resolution No. 2018-35 CERTIFICATE STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES) I, Maria E. Ayala, City Clerk of the City of Vernon, County of Los Angeles, State of California, hereby certify that the attached is a full and complete copy of: RESOLUTION NO. 2018-35 - A Resolution of the City Council of the City of Vernon Adopting a New Transmission Revenue Requirement for 2019 in Accordance with Vernon's Transmission Owner Tariff and Providing for Tariff Sheet Changes to Implement the Adjustment IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official Seal of the City of Vernon, County of Los Angeles, State of California, on this —q= day of October 2018. SEAL: Mari E. Aya Cit Clerk STAFF REPORT City Council Agenda Item Report Agenda ItemNo. COV-336-2018 Submitted by: Abraham Alemu Submitting Department: Public Utilities Meeting Date: October 16, 2018 SUBJECT A Resolution Adopting a New Transmission Revenue Requirement for 2019 in Accordance with Vernon!s Transmission Owner Tariff and Providing for Tariff Sheet Changes to Implement the Adjustment Recommendation: A. Find that approval of this action does not constitute a "project" pursuant to section 15378(b)(2) of the Guidelines to the California Environmental Quality Act ("CEQA'), because such action constitutes an administrative activity; and even if the adoption of the proposed item did constitute a project, it would be exempt in accordance with CEQA Guidelines section 15061(b)(3), the general rule that CEQA only applies to projects that may have an effect on the environment; and B. Conduct a Public Hearing; and C. Adopt a resolution adopting a new transmission revenue requirement for 2019 in accordance with Vemods Transmission Owner Tariff and providing for Tariff Sheet changes to implement the adjustment. Backgroud: The City of Vernon ("Vernon" or "Cky) is a Scheduling Coordinator and a Participating Transmission Owner ('PTO') in the California Independent System Operator Corporation ("ISO'). To participate in the ISO, PTOs are required to turn over administrative control of their transmission facilities and entitlements to the ISO. In return, the ISO collects revenues for each PTO pursuant to calculations that reflect the expenses and capital costs incurred by each PTO to provide transmission services. These calculations are known as Transmission Revenue Requirements (`°IRRs'). The relationship between PTOs and the ISO is governed by a Transmission Control Agreement ('TCA'), which sets forth specific duties and obligations of all PTOs. The TCA requires all PTOs to file a Transmission Owner Tariff ("TO Tariff) and TRR with the Federal Energy Regulatory Comrnission ("FERC'). The TCA further requires all PTOs to file any changes in their TRRs with FERC. Each PTO must also include in its TO Tariff its Gross Load which the ISO uses to calculate its grid -wide Transmission Access Charge ("TAC') rates, and which is related to the City's ability to recover its full TRR. TRANSMISSION REVENUE REQUIREMENT At present, the City's high voltage transmission assets consist of three long-term contracts (known as "existing transmission contracts" or "ETCs') which provide the City with dedicated access to high voltage transmission facilities owned by other entities. Specifically, the City has contractual entitlements to utilize transmission assets pursuant to one long-term transmission contract with the Los Angeles Department of Water and Power ("LADWP') and two long-term transmission contracts with Southern California Edison ("SCE'). The ETCs with SCE consist of one (the "SCE Victorville- Lugo ETC" described in SCE's FERC Rate Schedule 360) providing 11 MW of transmission capacity along the path between the Victorville- Lugo midpoint and the point of interconnection with the City's internal transmission system (the "City Gate"), and one (the "SCE Mead ETC" described in SCE's FERC Rate Schedule 207) providing 26 MW of transmission capacity along the path between the Mead 230 substation and the City Gate. The costs of these ETCs make up the majority of the costs recovered through the City's TRR. Until recently, for each of the ETCs, the City paid the owner of the transmission facilities a fixed rate which was specific to the transmission path provided under each ETC. The attached TRR Report supports the establishment of a new transmission revenue requirement associated with Vernon's high voltage entitlements. Fiscal Impact: The cost of Existing Transmission Service Contracts (ETC) incurred by the City will be recovered. ATTACHMENTS 1. Notice of Public Hearing to Establish Transmission Revenue Requirement 2. Resolution Adopting New TRR 2019.pdf City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323)583-8811 NOTICE OF TWO SEPARATE PUBLIC HEARINGS REGARDING THE ESTABLISHMENT OF VERNON'S NEW TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT AND VERNON'S NEW EXISTING TRANSMISSION CONTRACT ADJUSTMENT The City of Vernon will conduct a Public Hearing, which you may attend. PLACE: Vernon City Hall City Council Chamber 4305 Santa Fe Avenue Vernon, CA 90058 DATE & TIME: Tuesday, October 16, 2018, at 9:00 a.m. (or as soon thereafter as the matter can be heard) PURPOSE/SUBJECT: (1) To consider evidence to establish Vernon's new Transmission Revenue Balancing Account Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff, and (2) To consider evidence to establish Vernon's new Existing Transmission Contract Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff. DOCUMENTS FOR REVIEW: Copies of a Resolution Establishing a Transmission Revenue Balancing Account Adjustment for 2019 and a Resolution Adopting a New Transmission Revenue Requirement will be available for public examination at Vernon City Hall, located at 4305 Santa Fe Avenue, Vernon, California from October 4, 2018 through October 16, 2018. Please send your comments or questions to: Abraham Alemu City of Vernon, Public Utilities 4305 Santa Fe Avenue, Vernon, CA 90058 (323) 583-8811 Ext. 250 AALcmu�t�verno».ca.3ts PROPOSED CEQA FINDING: Find that approval of the proposed action is exempt from California Environmental Quality Act ("CEQA") review, because it is a fiscal and administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378. If you challenge the adoption/approval of the establishment of Vernon's new Transmission Revenue Balancing Account Adjustment, or Vernon's new Existing Transmission Contract Adjustment or any provision thereof in court, you may be limited to raising only those issues you or someone else raised at the hearing described in this notice or in written correspondence delivered to the City of Vernon at, or prior to, the meeting. Americans with Disabilities Act (ADA): In compliance with ADA, if you need special assistance to participate in the meeting, please contact the Office of the City Clerk at (323) 583-8811 ext. 546. The hearing may be continued or adjourned or cancelled and rescheduled to a stated time and place without further notice of a public hearing. Dated: September 13, 2018 Matthew Ceballos, Deputy City Clerk CALIFORNIA NEWSPAPER SERVICE BUREAU DAILY JOURNAL CORPORATION Mailing Address: 915 E FIRST ST, LOS ANGELES, CA 90012 Telephone (800) 788-7840 / Fax (800) 464-2839 Visit us @ www.LegalAdstore.com MATTHEW CEBALLOS CITY OF VERNON CITY CLERK 4305 SANTA FE AVE VERNON, CA 90058 COPY OF NOTICE Notice Type: GPN GOVT PUBLIC NOTICE Ad Description NOTICE OF TWO SEPARATE PUBLIC HEARINGS REGARDING THE ESTABLISHMENT OF VERNON'S NEW TRANSMISSION REVENUE BALANCING To the right is a copy of the notice you sent to us for publication in the HUNTINGTON PARK BULLETIN. Please read this notice carefully and call us with any corrections. The Proof of Publication will be filed with the County Clerk, if required, and mailed to you after the last date below. Publication date(s) for this notice is (are): 09/20/2018 An invoice will be sent after the last date of publication. If you prepaid this order in full, you will not receive an invoice. 11E $1111111111111111111111111111111111111111111111 1l1 1111$ 1111 PRE# 3174920 NOTICE OF TWO SEPARATE PUBLIC HEARINGS REGARDING THE ESTABLISHMENT OF VERNON'S NEW TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT AND VERNON'S NEW EXISTING TRANSMISSION CONTRACT ADJUSTMENT The City of Vernon will conduct a Public Hearing, which you may attend. PLACE: Vernon City Hall City Council Chamber 4305 Santa Fe Avenue Vernon, CA 90058 DATE & TIME: Tuesday, October 16, 2018, at 9:00 a.m. (or as soon thereafter as the matter can be heard) PURPOSE/SUBJECT: (1) To consider evidence to establish Vernon's new Transmission Revenue Balancing Account Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff, and (2) To consider evidence to establish Vernon's new Existing Transmission Contract Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff. DOCUMENTS FOR REVIEW: Copies of a Resolution Establishing a Transmission Revenue Balancing Account Adjustment for 2019 and a Resolution Adopting a New Transmission Revenue Requirement will be available for public examination at Vernon City Hall, located at 4305 Santa Fe Avenue, Vernon, California from October 4, 2018 through October 16, 2018. Please send your comments or questions to, Abraham Alemu City of Vernon, Public utilities 4305 Santa Fe Avenue, Vernon, CA 90058 (323) 583-8811 Ext. 250 AALemu(d,)ci.vernon ca us PROPOSED CEQA FINDING: Find that approval of the proposed action is exempt from California Environmental Quality Act ("CEQA") review, because it is a fiscal and administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378. If you challenge the adoption/approval of the establishment of Vernon's new Transmission Revenue Balancing Account Adjustment, or Vernon's new Existing Transmission Contract Adjustment or any provision thereof in court, you may be limited to raising only those issues you or someone else raised at the hearing described in this notice or in written correspondence delivered to the City of Vernon at, or prior to, the meeting. Americans with Disabilities Act (ADA): In compliance with ADA, if you need special assistance to participate in the meeting, please contact the Office of the City Clerk at (323) 583- 8811 ext. 546. The hearing may be continued or adjourned or cancelled and rescheduled to a stated time and place without further notice of a public hearing. Dated: September 13, 2018 Is/ Matthew Ceballos, Deputy City Clerk 9/20/18 PRE-3174920A HUNTINGTON PARK BULLETIN RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON ADOPTING A NEW TRANSMISSION REVENUE REQUIREMENT FOR 2019 IN ACCORDANCE WITH VERNON'S TRANSMISSION OWNER TARIFF AND PROVIDING FOR TARIFF SHEET CHANGES TO IMPLEMENT THE ADJUSTMENT WHEREAS, the City of Vernon ("City") is a chartered municipal corporation of the State of California that owns and operates a system for the generation, purchase, transmission, distribution and sale of electric capacity and energy; and WHEREAS, the City is a Participating Transmission Owner ("PTO") with the California Independent System Operator Corporation ("ISO"), and the Federal Energy Regulatory Commission ("FERC") has approved its existing Transmission Owner Tariff ("TO Tariff"); and WHEREAS, the ISO reimburses the City according to the City's current Transmission Revenue Requirement ("TRR") in return for the City turning over to the ISO the operation and control of the City's transmission entitlements; and WHEREAS, each PTO must include in its TO Tariff its Gross Load, which the ISO uses to calculate its grid -wide Transmission Access Charge ("TAC") rates, and which is related to the City's ability to recover its full TRR; and WHEREAS, the City's transmission entitlements include rights under certain contracts (each an "ETC") including (i) an agreement with the City of Los Angeles Department of Water and Power entitled "Los Angeles -Vernon Adelanto-Victorville-Lugo Firm Transmission Service Agreement" (the "LAWDP ETC"); (ii) an agreement with Southern California Edison Company ("SCE") entitled "Amended and Restated E Edison -Vernon Victorville-Lugo Firm Transmission Service Agreement" (the "SCE Victorville-Lugo ETC"); and (iii) an agreement with SCE entitled "Amended and Restated Edison -Vernon Mead Firm Transmission Services Agreement" (the "SCE Mead ETC"); and WHEREAS, the City's costs under the LADWP ETC, the SCE Victorville-Lugo ETC, and the SCE Mead ETC have traditionally been based upon a negotiated fixed "path -specific" rate charged by LADWP or SCE, based on the actual costs of the specific transmission lines made available under each ETC, multiplied by the amount of transmission capacity guaranteed to the City under each ETC; and WHEREAS, on August 1, 2008, SCE filed a petition with FERC seeking to amend the pricing structure under the SCE Victorville-Lugo ETC and the SCE Mead ETC to replace the negotiated path -specific rates set forth in those ETCs with a "postage -stamp" rate which reflects the blended rate SCE charges to the ISO for the actual usage of all of SCE's transmission lines by customers of the ISO; and WHEREAS, the postage -stamp rate which SCE charges to the ISO is derived from SCE's TRR and, therefore, will change each time SCE amends its TRR; and WHEREAS, on September 30, 2008, FERC accepted, subject to refund and hearing and settlement procedures, SCE's proposed revisions under the SCE Victorville-Lugo ETC and the SCE Mead ETC to replace the negotiated path -specific rates set forth in those ETCs with a postage - stamp rate, and thus the City's costs under the SCE Victorville-Lugo ETC and the SCE Mead ETC will vary proportionately with any changes in SCE's TRR; and WHEREAS, the City reached a settlement agreement (the "SCE Settlement") with SCE to amend the SCE Victorville-Lugo ETC and the SCE - 2 - Mead ETC to replace the path -specific rates set forth in those ETCs with SCE's postage -stamp rate after a phase -in period that began on August 1, 2009, during which the City's path -specific rates in those ETCs are gradually stepped -up over three years (the "Phase -In Rates") until the path -specific rates are equal to SCE's postage -stamp rate as of January 1, 2013; and WHEREAS, under the SCE Settlement, the City's costs for the SCE Victorville-Lugo ETC and the SCE Mead ETC are equal to (i) from August 1, 2009, until December 31, 2012, the Phase -In Rates, and beginning on January 1, 2013, the SCE postage -stamp rate, in each case multiplied by (ii) the amount of transmission capacity guaranteed to the City under each ETC; and WHEREAS, FERC approved the SCE Settlement pursuant to an order issued September 11, 2009, 128 FERC 1 61,237 (2009), in FERC Docket Nos. ER08-1343-000, ER08-1353-000, ER09-187-000, ER09-187-001, EL09-19-000, and ER09-446-000 ("SCE Settlement Order"); and WHEREAS, on behalf of the City, the Brattle Group, an experienced utilities consulting firm, developed a tracking mechanism for the City's TRR ("TRR Tracking Mechanism") to allow the City's TRR to be adjusted annually, effective January 1 of each year, to reflect changes in the City's costs under the SCE Victorville-Lugo ETC and the SCE Mead ETC that change as a result of (i) the stepped -up rates implemented between August 1, 2009 and December 31, 2012; or (ii) any change in SCE's TRR on or after January 1, 2013; and WHEREAS, on the basis of The Brattle Group's analysis and evidence from City staff, which was considered during a public meeting of the City Council held on July 13, 2009, the City, on July 15, 2009 ("July 15 FERC Filing"), filed with FERC proposed revisions to its TO E - 3 - Tariff proposing stated TRRs for each of the years 2010 to 2012, which dollar amounts were also included in the SCE Settlement ("TO Tariff Revisions"); and WHEREAS, the City also submitted in the July 15 FERC Filing a request to utilize an "ETC Adjustment Clause" to adjust automatically each year the costs the City incurs attributable to any changes in SCE's TRR associated with SCE's High Voltage Existing Contracts Access Charge ("HVECAC") rate; and WHEREAS, FERC approved the City's request to utilize an ETC Adjustment Clause to reflect annual projected changes to SCE's TRR, in an order issued September 11, 2009, 128 FERC 1 61,235 (2009), in FERC Docket No. EL09-64-000 ("TO Tariff Order"); and WHEREAS, under the TO Tariff Order, the City's TO Tariff revisions went into effect on August 1, 2009; and WHEREAS, on January 6, 2015, the City approved revisions to the template used to calculate the annual ETC Adjustment Clause; and WHEREAS, on April 8, 2015, FERC approved the City's 2015 filing with FERC reflecting modifications to the base TRR as calculated using the revised ETC Adjustment Clause template; and WHEREAS, on October 24, 2017, the City approved revisions to the Gross Load included in the City's TO Tariff that updated the Gross Load to be based on 2016 load data, rather than 2010 load data; and WHEREAS, on December 8, 2017, FERC approved the City's 2017 filing with FERC reflecting revisions to the Gross Load included in the City's TO Tariff; and WHEREAS, the City is required under the TO Tariff Order to submit annual filings with FERC reflecting modifications to the base TRR; and - 4 - c WHEREAS, a Notice of Public Hearing was published on September 20, 2018, notifying all interested parties that a hearing to consider evidence to establish the City's new TRR was scheduled for October 16, 2018, at approximately 9:00 a.m., subject to the hearing being continued or adjourned to a stated time and place without further notice of public hearing; and WHEREAS, on October 16, 2018, the City Council held a Public Hearing in which the City Council took evidence from staff and those other persons in attendance who wished to be heard on the calculation of the City's new TRR; and WHEREAS, the TRR for 2019 is shown in the amended Appendix I to the TO Tariff, a copy of which is attached hereto as Exhibit A and made a part hereof. WHEREAS, the Public Utilities Department has prepared a Report, dated October 16, 2018, with exhibits, a copy of which is attached hereto as Exhibit B and made a part hereof, which reiterates its previous conclusions that the TRR and ETC Adjustment Clause mechanism developed by The Brattle Group, approved by FERC under the amended TO Tariff, and revised in 2015 are reasonable and which calculates the amount derived under the ETC .Adjustment Clause for 2019; and WHEREAS, the Public Utilities Department has recommended the City adopt the TRR shown in the amended Appendix I to the TO Tariff, attached as Exhibit A, to be effective on January 1, 2019; and WHEREAS, the City Council has heard and considered all evidence, written and oral, presented in consideration of the establishment of the City's new TRR. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE 1C - 5 - CITY OF VERNON AS FOLLOWS: SECTION 1: The City Council of the City of Vernon hereby finds and determines that the recitals contained hereinabove are true and correct. SECTION 2: The City Council of the City of Vernon finds that this action does not constitute a "project" pursuant to section 15378(b)(2) of the Guidelines to the California Environmental Quality Act ("CEQA"), because such action constitutes an administrative activity; and even if the adoption of the proposed item did constitute a project, it would be exempt in accordance with CEQA Guidelines section 15061(b)(3), the general rule that CEQA only applies to projects that may have an effect on the environment. SECTION 3: The City Council of the City of Vernon hereby further finds and determines that all persons have had the opportunity to be heard or to file written comments to the proposed adoption of the City's TRR, and after due consideration of any and all evidence submitted at the Public Hearing, determines there are compelling reasons to justify the adoption of the City's TRR, to be effective January 1, 2019. SECTION 4: The City Council of the City of Vernon hereby declares that: (a) any determination made pursuant to this Resolution regarding the validity or reasonableness of any portion of any TRR or TO Tariff shall apply only prospectively from the date of this Resolution; and (b) in no way shall this Resolution affect the City Council's adoption or determination of any previous TRR or TO Tariff. SECTION 5: The City Council of the City of Vernon hereby 11 - 6 - approves, pursuant to the TO Tariff and to be effective on January 1, 2019, the.establishment of the City's new TRR and Appendix I to the TO Tariff implementing the new TRR, as described in the Public Utilities Department Report dated October 16, 2018. SECTION 6: The City Council of the City of Vernon hereby authorizes outside counsel to submit the City's TRR, the amended Appendix I to the Vernon TO Tariff, and supporting documentation, such as the Report, and this City Council Resolution approving the new TRR, to FERC on behalf of the City of Vernon. SECTION 7: The City Clerk of the City of Vernon shall certify to the passage, approval and adoption of this resolution, and the City Clerk of the City of Vernon shall cause this resolution and the City Clerk's certification to be entered in the File of resolutions of the Council of this City. APPROVED AND ADOPTED this 16th day of October, 2018. ATTEST: Maria E. Ayala, City Clerk APPROVED AS TO FORM: l Katharine Mapes, Esq. Spiegel & McDiarmid, LLP Special Counsel to City Name: Title: Mavor `M - 7 - STATE OF CALIFORNIA ) ) ss COUNTY OF LOS ANGELES ) I, Maria E. Ayala, City Clerk of the City of Vernon, do hereby certify that the foregoing Resolution, being Resolution No. , was duly passed, approved and adopted by the City Council of the City of Vernon at a regular meeting of the City Council duly held on October 16, 2018, and thereafter was duly signed by the Mayor or Mayor Pro-Tem of the City of Vernon. Executed this day of October, 2018, at Vernon, California. (SEAL) - 8 - Maria E. Ayala, City Clerk 13 EXHIBIT A 14 APPENDIX I Transmission Revenue Requirement and TRBAA The Vernon Base Transmission Revenue Requirement is $.2 446,805 and is comprised of the following components: Base TRR costs not subject to ETC Adjustment Clause: $498,480 ETC Adjustment Clause: Forecast SCE ETC Costs: $,Z.388,720 Balance of Difference between prior year Forecast and Actual SCE ETC Costs: (417 712) Interest on Difference between prior year Forecast and Actual SCE ETC Costs: ($r2,683) The ETC Adjustment Clause is: The projected SCE ETC Cost for the next calendar year, plus the true -up (positive or negative) of the prior October through September SCE ETC Cost with interest calculated pursuant to 18 C.F.R. § 35.19a. The ETC Adjustment Clause will be recalculated annually and filed with the Commission with a proposed effective date of January 1 of each year. The TRBAA is a negative $� 1,176 for calendar year 201F). Vernon's Gross Load, consistent with its TRR, used by the ISO to develop the Transmission Access Charge is 1,154,492 MWhs. All of Vernon's transmission facilities and Entitlements placed under the ISO's Operational Control are High Voltage Facilities as defined by the ISO Tariff. The TRBAA will be recalculated annually consistent with the ISO Tariff approved by the Vernon City Council, and provided to the ISO. _ ___. Dele f ele Dele [Re e DeIe D le 15 APPENDIX I Transmission Revenue Requirement and TRBAA The Vernon Base Transmission Revenue Requirement is $2,446,805 and is comprised of the following components: Base TRR costs not subject to ETC Adjustment Clause: $498,480 ETC Adjustment Clause: Forecast SCE ETC Costs: $2,388,720 Balance of Difference between prior year Forecast and Actual SCE ETC Costs: ($417,712) Interest on Difference between prior year Forecast and Actual SCE ETC Costs: ($22,683) The ETC Adjustment Clause is: The projected SCE ETC Cost for the next calendar year, plus the true -up (positive or negative) of the prior October through September SCE ETC Cost with interest calculated pursuant to 18 C.F.R. § 35.19a. The ETC Adjustment Clause will be recalculated annually and fled with the Commission with a proposed effective date of January 1 of each year. The TRBAA is a negative $21,176 for calendar year 2019. Vernon's Gross Load, consistent with its TRR, used by the ISO to develop the Transmission Access Charge is 1,154,492 MWhs. All of Vernon's transmission facilities and Entitlements placed under the ISO's Operational Control are High Voltage Facilities as defined by the ISO Tariff. The TRBAA will be recalculated annually consistent with the ISO Tariff approved by the Vernon City Council, and provided to the ISO. W. EXHIBIT B 17 CITY OF VERNON PUBLIC UTILITIES DEPARTMENT REPORT REGARDING THE ESTABLISHMENT OF A REVISED NEW TRANSMISSION REVENUE REQUIREMENT ASSOCIATED WITH VERNON'S HIGH VOLTAGE ENTITLEMENTS October 16, 2018 The City of Vernon ("Vernon" or "City") is a Scheduling Coordinator and a Participating Transmission Owner ("PTO") in the California Independent System Operator Corporation ("ISO"). To participate in the ISO, PTOs are required to turn over administrative control of their transmission facilities and entitlements to the ISO. In return, the ISO collects revenues for each PTO pursuant to calculations that reflect the expenses and capital costs incurred by each PTO to provide transmission services. These calculations are known as Transmission Revenue Requirements ("TRRs"). The relationship between PTOs and the ISO is governed by a Transmission Control Agreement ("TCA"), which sets forth specific duties and obligations of all PTOs. The TCA requires all PTOs to file a Transmission Owner Tariff ("TO Tariff") and TRR with the Federal Energy Regulatory Commission ("FERC"). The TCA further requires all PTOs to file any changes in their TRRs with FERC. Each PTO must also include in its TO Tariff its Gross Load which the ISO uses to calculate its grid -wide Transmission Access Charge ("TAC") rates, and which is related to the City's ability to recover its full TRR. TRANSMISSION REVENUE REQUIREMENT At present, the City's high voltage transmission assets consist of three long-term contracts (known as "existing transmission contracts" or "ETCs") which provide the City with dedicated access to high voltage transmission facilities owned by other entities. Specifically, the City has contractual entitlements to utilize transmission assets pursuant to one long-term transmission contract with the Los Angeles Department of Water and Power ("LADWP") and two long-term transmission contracts with Southern California Edison ("SCE"). The ETCs with SCE consist of 18 one (the "SCE Victorville-Lugo ETC" described in SCE's FERC Rate Schedule 360) TRR Report 2019 Page 2 of 6 providing 11 MW of transmission capacity along the path between the Victorville- Lugo midpoint and the point of interconnection with the City's internal transmission system (the "City Gate"), and one (the "SCE Mead ETC" described in SCE's FERC Rate Schedule 207) providing 26 MW of transmission capacity along the path between the Mead 230 substation and the City Gate. The costs of these ETCs make up the majority of the costs recovered through the City's TRR. Until recently, for each of the ETCs, the City paid the owner of the transmission facilities a fixed rate which was specific to the transmission path provided under each ETC. On August 1, 2008, SCE proposed to increase its TRR and associated rates in FERC Docket No. ER08-1343-000. In a related filing submitted in FERC Docket No. ER08-1353-000, SCE proposed to transition both of its ETCs with Vernon from their current, fixed "path -specific" rates to a so-called "postage stamp" rate methodology which reflects the blended rate which SCE charges the ISO pursuant to its own TRRs for the actual usage of all of SCE's transmission facilities by customers of the ISO (the "HVECAC Rate"). The HVECAC Rate that SCE proposed in its TO Tariff is derived from SCE's TRR and, therefore, will change each time SCE amends its On September 30, 2008, FERC accepted, subject to refund and hearing and settlement procedures, SCE's proposed revisions to its TO Tariff to transition the negotiated path -specific rates set forth in the SCE Victorville-Lugo ETC and the SCE Mead ETC to the uniform HVECAC Rate, and thus the City's costs under those ETCs will vary proportionately with any changes in SCE's TRR. The City reached a settlement agreement (the "SCE Settlement") with SCE to amend the SCE Victorville-Lugo ETC and the SCE Mead ETC to fully transition the path -specific rates set forth in those ETCs to SCE's HVECAC Rate after a phase -in period that began on August 1, 2009, during which the City's path -specific rates in those ETCs have been gradually stepped -up under incrementally increasing fixed 19 TRR Report 2019 Page 3 of 6 rates (the "Phase -In Rates") until the path -specific rates are equal to the HVECAC Rate as of January 1, 2013. FERC approved the SCE Settlement pursuant to an order issued September 11, 2009, 128 FERC ¶ 61, 237 (2009), in FERC Docket Nos. ER08-1343-000, ER08-1353-000, ER09-187-000, ER09-187-001, EL09-19- 000, and ER09-446-000 ("SCE Settlement Order"). On behalf of the City, The Brattle Group, an experienced utilities consulting firm, developed a TRR tracking mechanism clause for the City's TRR ("ETC Adjustment Clause"), which allows the City's TRR to be adjusted annually, effective January 1 of each year, to reflect changes in the City's transmission expenses associated with any changes implemented by SCE in the HVECAC Rate associated with the SCE Victorville-Lugo ETC and the SCE Mead ETC. On the basis of The Brattle Group's analysis and evidence from City staff, which was considered during a public meeting of the City Council held on July 13, 2009, the City, on July 15, 2009 ("July 15 FERC Filing"), filed with FERC the proposed (i) revisions to its TO Tariff proposing the City's stated TRRs for each of the years 2010 to 2012, which dollar amounts were also included in the SCE Settlement ("TO Tariff Revisions") and (ii) the ETC Adjustment Clause tracking mechanism. The July 15 FERC Filing acknowledged that, to the extent that the SCE Settlement was accepted, because the stated Phase -In Rates would be fixed, the ETC Adjustment Clause for the term of the Phase -In Rates would be zero. FERC approved the City's July 15 FERC Filing, including the TO Tariff Revisions, the City's proposed calculations of the TRR for years 2010 to 2012, and the City's request to utilize an ETC Adjustment Clause, in an order issued September 11, 2009, 128 FERC ¶ 61,235 (2009), in FERC Docket No. EL09-64-000 ("TO Tariff Order"). The City is required under the TO Tariff Order to submit annual filings each year with FERC reflecting annual modifications to the base TRR of the City. In January 2015, the City approved revisions to the template used to calculate the 2C TRR Report 2019 Page 4 of 6 ETC Adjustment Clause and submitted these revisions to FERC. On April 8, 2015, FERC approved the City's 2015 TRR filing as calculated using the revised ETC Adjustment Clause template; the City has prepared this year's filing using that revised template. CALCULATION OF THE ETC ADJUSTMENT CLAUSE Section 5.3 of the Vernon TO Tariff identifies the items to be reflected in the ETC Adjustment. The ETC Adjustment Clause shall be calculated as: ETC Adjustment = ETCCF+ ETCCT+ I ETCCF = The forecast of SCE ETC Cost for the following calendar year ETCCT = The balance representing the prior period difference between the projected cost of the SCE ETCs ("SCE ETC Cost") and the actual cost. I = The interest balance for the ETC, which shall be calculated using the interest rate pursuant to Section 35.19(a) of FERC's regulations under the Federal Power Act (18 C.F.R. 35.19(a)). Interest shall be calculated based on the average ETC true -up balance each month, compounded quarterly. A summary of the elements of the Vernon ETC Adjustment Clause proposed to be effective January 1, 2019 is shown in Exhibit 1. The ETC Adjustment Clause to be effective for the twelve months starting January 1, 2019 is $1,948,325. The ETCCF Component The ETCCF component stands for the forecast of SCE ETC costs for the following calendar year, in this case 2019. These forecast SCE ETC costs reflect 2019 rates from Southern California Edison Company's draft FERC Filing, posted on its website pursuant to its formula rate protocols (approved in FERC Docket No. ER11-3697). That filing is scheduled to be made at FERC, in its final form, in December 2018; Vernon will true up any differences in its SCE ETC costs when it makes its 2020 21 TRR Report 2019 Page 5of6 TRR filing. The ETCCF for 2018 SCE ETC costs are projected to be $2,388,720 as shown in The ETCCT Component ETCCT represents a balance that reflects the difference between prior year forecast and actual SCE ETC costs. The prior period in this case is the twelve-month period starting October 1, 2017 and ending September 30, 2018. A summary of the determination of the September 30, 2018 balance in the ETC Adjustment Clause is shown in Exhibit 1. The ETCCT component reflects 1) the previously projected 2016 SCE ETC costs of $225,700 per month, for the months October through December 2017 and projected 2018 SCE ETC costs of $230,510 per month, for the months January through September 2018, 2) actual 2017 SCE ETC costs of $ 20,9420 per month, for the months October through December 2017 and $227,920 per month, for the months January through September 2018, and 3) refunds received by the City —all elements as reflected on Line No. 8, 15, and 16 of Exhibit 1. The net of these elements produce the under (or over) collection figures reflected in Line 17 of Exhibit 1. The ending balance is the sum of the beginning balance on October 1 and the (over)/under collection — both elements as reflected on Line 1 and 17 of Exhibit 1. The cumulative monthly balances are carried forward from month to month and the ETCCT component on September 30, 2018 of negative $417,712 is shown in line 19 of Exhibit 1. The I (Interest) Component The Interest component reflects interest on the difference between prior year forecast and actual SCE ETC costs. The monthly interest carrying costs are calculated using the 18 C.F.R. § 35.19(a) interest rates and calculation method. These interest rates are published by FERC and reflect the prime rate values published in the Federal Reserve Bank's "Selected Interest Rates." 22 TRR Report 2019 Page 6 of 6 Interest is calculated monthly on the average cumulative monthly balance and is compounded quarterly. The interest component is negative $22,683, as shown in Lines 20-24 of Exhibit 1. RECOMMENDATIONS 1. Approve the establishment of the City's revised new TRR for 2019 and revised Appendix I to the TO Tariff. 2. Authorize outside counsel to submit the City's TRR, ETC Adjustment Clause amount, the revised Appendix I to the TO Tariff, and this City Council Resolution approving the TRR and ETC Adjustment Clause amount to FERC on behalf of the City of Vernon. 23 n 3 3 � n 3 3 S S c c10 m im m z — _ 3 X q s S 73 ggg8 _ ae ae 0��� a og W ti N W V a g $ Y Y c I m No _ - r a 7• & � d' � `$ ? g o I� g' m o to � W L" 'n K a u g• W .�. N g b m m e e a s e� _ z 4 C p 0 a 3 � i. 9 c o � o g� r`�^ .g• ' 2S b S Ya' fie' c ? m QQg• � ass r'4 City of Vernon 4305 Santa Fe Avenue Vernon, CA 90058 (323) 583-8811 NOTICE OF TWO SEPARATE PUBLIC HEARINGS REGARDING THE ESTABLISHMENT OF VERNON'S NEW TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT AND VERNON'S NEW EXISTING TRANSMISSION CONTRACT ADJUSTMENT The City of Vernon will conduct a Public Hearing, which you may attend. PLACE: Vernon City Hall City Council Chamber 4305 Santa Fe Avenue Vernon, CA 90058 DATE & TIME: Tuesday, October 16, 2018, at 9:00 a.m. (or as soon thereafter as the matter can be heard) PURPOSE/SUBJECT: (1) To consider evidence to establish Vernon's new Transmission Revenue Balancing Account Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff, and (2) To consider evidence to establish Vernon's new Existing Transmission Contract Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff. DOCUMENTS FOR REVIEW: Copies of a Resolution Establishing a Transmission Revenue Balancing Account Adjustment for 2019 and a Resolution Adopting a New Transmission Revenue Requirement will be available for public examination at Vernon City Hall, located at 4305 Santa Fe Avenue, Vernon, California from October 4, 2018 through October 16, 2018. Please send your comments or questions to: Abraham Alemu City of Vernon, Public Utilities 4305 Santa Fe Avenue, Vernon, CA 90058 (323) 583-8811 Ext. 250 AAl.,ci-nu i.vernon.ca.us PROPOSED CEQA FINDING: Find that approval of the proposed action is exempt from California Environmental Quality Act ("CEQA") review, because it is a fiscal and administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378. If you challenge the adoption/approval of the establishment of Vernon's new Transmission Revenue Balancing Account Adjustment, or Vernon's new Existing Transmission Contract Adjustment or any provision thereof in court, you may be limited to raising only those issues you or someone else raised at the hearing described in this notice or in written correspondence delivered to the City of Vernon at, or prior to, the meeting. Americans with Disabilities Act (ADA): In compliance with ADA, if you need special assistance to participate in the meeting, please contact the Office of the City Clerk at (323) 583-8811 ext. 546. The hearing may be continued or adjourned or cancelled and rescheduled to a stated time and place without further notice of a public hearing. Dated: September 13, 2018 � Matthew Ceballos, Deputy City Clerk CALIFORNIA NEWSPAPER SERVICE BUREAU DAILY JOURNAL CORPORATION Mailing Address: 915 E FIRST ST, LOS ANGELES, CA 90012 Telephone (800) 788-7840 / Fax (800) 464-2839 Visit us @ www.LegalAdstore.com MATTHEW CEBALLOS CITY OF VERNON CITY CLERK 4305 SANTA FE AVE VERNON, CA 90058 COPY OF NOTICE Notice Type: GPN GOVT PUBLIC NOTICE Ad Description NOTICE OF TWO SEPARATE PUBLIC HEARINGS REGARDING THE ESTABLISHMENT OF VERNON'S NEW TRANSMISSION REVENUE BALANCING To the right is a copy of the notice you sent to us for publication in the HUNTINGTON PARK BULLETIN. Please read this notice carefully and call us with any corrections. The Proof of Publication will be filed with the County Clerk, if required, and mailed to you after the last date below. Publication date(s) for this notice is (are): 09/20/2018 An invoice will be sent after the last date of publication. If you prepaid this order in full, you will not receive an invoice. ..000004ea=9.,. PRE# 3174920 NOTICE OF TWO SEPARATE PUBLIC HEARINGS REGARDING THE ESTABLISHMENT OF VERNON'S NEW TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT AND VERNON'S NEW EXISTING TRANSMISSION CONTRACT ADJUSTMENT The City of Vernon will conduct a Public Hearing, which you may attend. PLACE: Vernon City Hall City Council Chamber 4305 Santa Fe Avenue Vernon, CA 90058 DATE & TIME: Tuesday, October 16, 2018, at 9:00 a.m. (or as soon thereafter as the matter can be heard) PURPOSE/SUBJECT: (1) To consider evidence to establish Vernon's new Transmission Revenue Balancing Account Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff, and (2) To consider evidence to establish Vernon's new Existing Transmission Contract Adjustment for its high voltage (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff. DOCUMENTS FOR REVIEW: Copies of a Resolution Establishing a Transmission Revenue Balancing Account Adjustment for 2019 and a Resolution Adopting a New Transmission Revenue Requirement will be available for public examination at Vernon City Hall. located at 4305 Santa Fe Avenue, Vernon, California from October 4, 2018 through October 16, 2018. Please send your comments or questions to: Abraham Alemu City of Vernon, Public Utilities 4305 Santa Fe Avenue, Vernon, CA 90058 (323) 583-8811 Ext. 250 AAI-emuCa�ci.vernon.ca. u s PROPOSED CEQA FINDING: Find that approval of the proposed action is exempt from California Environmental Quality Act ("CEQA") review, because it is a fiscal and administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378. If you challenge the adoption/approval of the establishment of Vernon's new Transmission Revenue Balancing Account Adjustment, or Vernon's new Existing Transmission Contract Adjustment or any provision thereof in court, you may be limited to raising only those issues you or someone else raised at the hearing described in this notice or in written correspondence delivered to the City of Vernon at, or prior to, the meeting. Americans with Disabilities Act (ADA): In compliance with ADA.. if you need special assistance to parucipate in the meeting, please contact the Office of the City Clerk at (323) 583- 8811 ext. 546. The hearing may be continued or adjourned or cancelled and rescheduled to a stated time and place without further notice of a public hearing. Dated: September 13, 2018 /s/ Matthew Ceballos, Deputy City Clerk 9/20/18 PRE3174920# HUNTINGTON PARK BULLETIN HUNTINGTON PARK BULLETIN 3731 WILSHIRE BLVD STE 840, LOS ANGELES, CA 90010 Telephone (323) 556-5720 / Fax (213) 835-0584 This space for filing stamp only MATTHEW CEBALLOS CITY OF VERNON CITY CLERK PRE#: 3174920 4305 SANTA FE AVE NOTICE OF TWO SEPARATE PUBLIC REGARDING THE VERNON,EARINGS ERNON, CA - 90058 ESTABLISHMENT OF VERNON'S NEW TRANSMISSION REVENUE BALANCING ACCOUNT ADJUSTMENT AND VERNON'S NEW EXISTING TRANSMISSION CONTRACT ADJUSTMENT The City of Vernon will conduct a Public Hearing, PROOF OF PUBLICATION You may attend. VernonCity PLACE: on Cty Hall City Council Chamber 4305 Santa Fe Avenue (2015.5 C.C.P.) Vernon, CA 90058 DATE & TIME: Tuesday, October 16, 2018, at State of California ) 9:00 a.m(or as soon thereafter as the matter can County of LOS ANGELES ) ss beheard) PURPOSE/SUBJECT: (1) To consider evidence to establish Vernon's new Transmission Revenue Balancing Account Adjustment for its high voltage Notice Type: GPN - GOVT PUBLIC NOTICE (over 200 kV) transmission entitlements (all located outside the City) pursuant to Vernon's Transmission Owner Tariff, and (2) To consider evidence to establish Vernon's new Existing Ad Description: Transmission Contract Adjustment for its high voltage (over 200 kV) transmission entitlements NOTICE OF TWO SEPARATE PUBLIC HEARINGS located outsideCi )pursuant to Vernon's W.,rismsson OwnerhTariff DOCUMENTS FOR REVIEW: I am a citizen of the United States and a resident of the State of California, I am copies ofa Resolution Establishing a Transmission Revenue Balancing Account over the age of eighteen years, and not a party to or interested in the above Adjustment for 2019 entitled matter. I am the principal clerk of the printer and publisher of the and a Resolution Adopting a New Transmission Revenue Requirement will be available for public HUNTINGTON PARK BULLETIN, a newspaper published in the English examination at Vernon City Hall, located at 4305 language in the city of HUNTINGTON PARK, county of LOS ANGELES, and Santa Fe Avenue, Vernon, California from October 4, 2018 through October 16, 2018. adjudged a newspaper of general circulation as defined by the laws of the State Please send your comments or questions to: of California by the Superior Court of the County of LOS ANGELES, State of Abraham Alemu California, under date 06/14/1943, Case No. 485073. That the notice, of which City of Vernon, Public Utilities 4305 Santa Fe Avenue, Vernon, CA 90058 the annexed is a printed copy, has been published in each regular and entire (323) 583-8811 Ext. 250 issue of said newspaper and not in any supplement thereof on the following AALemuc3ci.vernon.ca.us dates, to -wit: PROPOSED CEQA FINDING: Find that approval of the proposed action is exempt from California Environmental Quality Act ("CEQA") review, because it is a fiscal and administrative activity that will not result in direct or indirect physical changes in the environment, and therefore does not constitute a "project" as defined by CEQA Guidelines section 15378. If you challenge the adoption/approval of the establishment of Vernon's new Transmission Revenue Balancing Account Adjustment, or Vernon's new Existing Transmission Contract Adjustment or any provision thereof in court, you 09/20/2018 may be limited to raising only those issues you or someone else raised at the hearing described in this notice or in written correspondence delivered to the City of Vernon al, or prior to, the meeting. Executed on: 09/20/2018 At Los Angeles, California Americans with Disabilities Act (ADA): In compliance with ADA, if you need special assistance to participate in the meeting, please of that the foregoing is true and contact the Office of the City Clerk at (323) 583- I certify (or declare) under penalty perjury 8811 ext. 546. correct. The hearing may be continued or adjourned or cancelled and rescheduled to a stated time and place without further notice of a public hearing. Dated: September 13. 2018 LL Signature IIIIIII IIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIII IIII * A 0 0 0 0 0 4 8 6 8 7 4 9 Email Matthew Ceballos, Deputy City Clerk 9/20/18 PRE-3/749200 HUNTINGTON PARK BULLETIN