Loading...
Resolution No. 2022-035RESOLUTION NO. 2022-35 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF VERNON APPROVING AND ADOPTING THE VERNON PUBLIC UTILITIES DEPARTMENT RESOURCE ADEQUACY PLAN FOR 2023, WHICH INCLUDES THE COINCIDENT PEAK DEMAND FORECAST, THE PLANNING RESERVE MARGIN, THE QUALIFIYING CAPACITY CRITIERIA AND THE QUALIFIYING CAPACITY FROM SUCH RESOUCRES, CITY’S RESOURCE ADEQUACY AND SUPPLY DATA AND APPROVING THE RESOURCES USED TO SATISFY THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR’S TARIFF REQUIREMENTS SECTION 1. Recitals. A. The City of Vernon (City) is a chartered municipal corporation of the State of California that owns and operates a system for the generation, purchase, transmission, distribution and sale of electric capacity and energy. B. The City has executed a Metered Subsystem Agreement (MSS Agreement) with the California Independent System Operator (CAISO). C. The City is considered a Load Serving Entity (LSE) under certain terms of the CAISO’s Tariff (Tariff). D. The Tariff requires each LSE to establish and submit to CAISO an annual Resource Adequacy Plan, which includes a coincident peak Demand Forecast, a Planning Reserve Margin, Qualifying Capacity Criteria, and a Supply Plan. E. The Tariff also requires each LSE to submit monthly Resource Adequacy Plans and Supply Plans. F. The City has reviewed the historical and expected demand for and supplies of electricity within its distribution system, including the likely peak demand for electricity within the City’s distribution system throughout 2023, the available generation and other capacity to serve that demand, and constraints which might impact the availability of capacity to serve the City’s projected peak demand. G. Based upon staff analysis, no load growth adjustment is appropriate for 2023. H. Based upon that review, the City finds that the default 15% Reserve Margin set forth in the Resource Adequacy provisions of the Market Redesign and Technology Upgrade (MRTU) Tariff is sufficient for planning purposes. I. Based upon that review, the City finds that the Projected Load forecast specified DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Resolution No. 2022-35 Page 2 of 21 _______________________ in the City of Vernon Demand Forecast for 2023, Planning Reserve Margin, and the Qualifying Capacity Criteria are sufficient and appropriate to be used in determining the amount of Qualifying Capacity needed to meet the Annual Resource Adequacy and Supply Plan requirement. J. Staff requests City Council’s adoption of the following requirements for the annual and monthly submittals: (a) annual submittals must demonstrate that (i) 90% of the total system Coincident Peak Demand Forecast, plus Planning Reserve Margin and Flexible Resource Adequacy Capacity Requirement has been secured; and (ii) 100% of the total local Resource Adequacy requirement has been secured; and (b) monthly submittals must demonstrate that 100% of the Coincident Peak Demand Forecast plus planning Reserve Margin, Flexible Resource Adequacy Capacity Requirement and local Resource Adequacy requirement has been met. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF VERNON AS FOLLOWS: SECTION 2. The City Council of the City of Vernon hereby finds and determines that the above recitals are true and correct. SECTION 3. The City Council of the City of Vernon hereby approves and adopts the Public Utilities Department Resource Adequacy Plan for Calendar Year 2023 (Annual Resource Adequacy Plan), which includes the coincident peak Demand Forecast, the Planning Reserve Margin, the Qualifying Capacity Criteria and the Qualifying Capacity from such resources, the annual Resource Adequacy and Supply data, and the Resource Adequacy resources that will be used to satisfy the City’s Local Capacity Requirement for 2023, which is attached hereto as Exhibit A. Furthermore, the City Council of the City of Vernon adopts the requirements for: (a) annual submittals must demonstrate that (i) 90% of the total system Coincident Peak Demand Forecast, plus Planning Reserve Margin and Flexible Resource Adequacy Capacity Requirement has been secured; and (ii) 100% of the total local Resource Adequacy requirement has been secured; and (b) monthly submittals must demonstrate that 100% of the Coincident Peak Demand Forecast plus planning Reserve Margin, Flexible Resource Adequacy Capacity Requirement and local Resource Adequacy requirement has been met. / / / / / / / / / DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Resolution No. 2022-35 Page 3 of 21 _______________________ SECTION 4. The City Clerk shall certify the passage and adoption of this resolution and enter it into the book of original resolutions. APPROVED AND ADOPTED October 4, 2022. ________________________ LETICIA LOPEZ, Mayor ATTEST: LISA POPE, City Clerk (seal) APPROVED AS TO FORM: ZAYNAH N. MOUSSA, City Attorney I CERTIFY THAT THE FOREGOING RESOLUTION NO. 2022-35 was passed and adopted by the City Council of the City of Vernon at the Regular meeting on October 4, 2022 by the following vote: AYES: 4 Council Members: Merlo, Ybarra, Larios, Lopez NOES: 0 ABSENT: 1 Council Member: Davis ABSTAIN: 0 ________________________________ LISA POPE, City Clerk (seal) DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 City of Vernon Public Utilities Department Resource Adequacy Plan Calendar Year 2023 Exhibit A Resolution No. 2022-35 Page 4 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 2 Background: The Resource Adequacy (RA) provisions of the California Independent System Operator’s (CAISO) tariff require the Scheduling Coordinator (SC) of a Load Serving Entity (LSE), such as the City of Vernon, to establish and submit the following information upon approval from its Local Regulatory Authority: (1) Coincident Peak Demand Forecast for its load, (2) Planning Reserve Margin, (3) Qualifying Capacity Criteria that will be used for determining qualifying resource types and the Qualifying Capacity from such resources, (4) an annual/monthly RA and supply data, and (5) a list of resources used to satisfy the LSE’s Local Capacity Requirement and Flexible Resource Adequacy Capacity Requirement. Staff has prepared the attached “City of Vernon Public Utilities Department’s Resource Adequacy Plan for Calendar Year 2023,” which is consistent with the CAISO Tariff requirements. The following is a discussion of each of the CAISO Tariff requirements and how the City will meet each requirement. Coincident Peak Demand Forecast: Vernon’s municipal load resides within the CAISO control area. The CAISO, as the balancing authority, has the responsibility for meeting reliability criteria established by the Western Electricity Coordinating Council (WECC). As such CAISO has entered into agreements with various market participants, Generators, Scheduling Coordinators, Participating Transmission Owners, Utility Distribution Companies, and Metered Subsystems (MSS), which impose certain responsibilities on parties to establish a reliable system. One of those responsibilities is to have operating reserves that meet the WECC minimum requirements. The CAISO’s goal in considering reserve requirements is to balance available capacity with demand across the entire CAISO control area, and therefore, CAISO’s primary concern is with the time and amount of peak demand on the CAISO controlled transmission system (the “system peak”). In order to reduce demand during the period of the system peak (and therefore, Resolution No. 2022-35 Page 5 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 3 to lower the peak demand on the transmission system), utilities generally offer retail rate structures designed to encourage load shifting away from the on-peak period. Such efforts are intended to achieve on-peak demand reduction and lower the need to build new generation to meet peak demand. Vernon has adopted a rate structure that has successfully shifted the peak demand period for Vernon’s system to a time that is generally earlier than the time of the CAISO system peak. Vernon’s share of the capacity needed to meet CAISO’s control area capacity requirements may be established by determining the amount of Vernon’s load that contributes to the CAISO system peak. Vernon’s load that contributes to the CAISO system peak is the City of Vernon coincident peak Demand. The process to establish Vernon’s monthly coincident peak Demand Forecast consists of the following three steps: 1. Establish Monthly Vernon System Peak Demand Forecast for 2023 To establish the City of Vernon’s system peak demand forecast, Staff performs an analysis on annual changes in the City’s energy demand peaks during a five-year period. Based on the results of the analysis, Staff forecasts a load growth rate for the upcoming calendar year (Exhibit 1). This year’s analysis the City of Vernon’s system peak demand increased and decreased year over year between 2018 and 2022. Closer review of Exhibit 1 reveals that the growth rate from 2021 to 2022 decreased by 3.58%. Based on the current load trend and recent years of inconsistencies, Staff concluded no load growth adjustment is an appropriate forecast for calendar year 2023. Exhibit 2 shows the determination of the projected system peak demand for 2023 based on no load growth adjustment. The projected system peak demand for the City of Vernon is shown below in Table 1. Resolution No. 2022-35 Page 6 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 4 Table 1 Projected Load 2023 MW January 169.62 February 174.42 March 173.45 April 183.82 May 176.02 June 184.44 July 183.34 August 187.35 September 189.41 October 180.56 November 182.44 December 173.15 2. Establish Coincidental Peak Factor The coincidental peak factor is the percentage of the City of Vernon’s energy demand at the time of the CAISO system peak demand. As set forth in Section 40 of the CAISO Tariff, the coincidental peak factor for each month has been calculated and provided to the City annually by the California Energy Commission (CEC). The monthly coincidental peak factor is shown in column C of Exhibit 3. 3. Calculate Monthly Coincident Peak Demand Forecast The City of Vernon’s Coincident Peak Demand forecast is calculated as the mathematical product of the City of Vernon’s forecasted System peak demand and the coincidental peak factor. This reflects the City of Vernon’s projected demand at the time of the CAISO system peak demand for each month. The monthly Coincident Peak Demand Forecast is calculated and listed in column D of Exhibit 3 for the period of January through December 2023. It is also shown below in Table 2. Resolution No. 2022-35 Page 7 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 5 Table 2 Demand Forecast 2023 MW January 130.8 February 137.0 March 135.4 April 138.6 May 147.0 June 148.8 July 147.1 August 147.2 September 157.2 October 151.2 November 145.9 December 137.7 Planning Reserve Margin The Planning Reserve Margin is the amount of Resource Adequacy Capacity that an LSE must maintain above its coincident peak Demand Forecast. Historically, the City of Vernon has established its Planning Reserve Margin at 15%. Staff recommends that the City Council maintain the Planning Reserve Margin at 15%. The 15% Planning Reserve Margin is used to establish the monthly Resource Adequacy obligation for the City of Vernon as listed in column E of Exhibit 3. Qualifying Capacity: A Load Serving Entity must provide the CAISO with a description of the criteria that will be used to determine the type of resources that can be used to meet its capacity obligation and the amount of capacity (Qualifying Capacity) from such resources. Historically, Vernon has used the following criterion to determine whether a resource qualifies: It qualifies if Vernon has a contractual right to the power or has an interruptible service agreement with a customer. The seven following resources are among those that meet this criterion and provide Qualifying Resolution No. 2022-35 Page 8 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 6 Capacity. The calculation for the amount of Qualifying Capacity for the seven eligible resource types are as follows: 1. CAISO IST-enabled Product. Power supply contract/s entered through WSPP Agreement (MRTU Amendment) and defined as any SC-to-SC traded product for which an IST (Inter-SC Trades) can be submitted and for which CAISO will make payment or issue an invoice, including Energy, Tier I IFM Bid Cost Recovery Obligations and Ancillary Service Obligation trades, as each defined in the Tariff. 2. Palo Verde. Vernon Purchase Power Contract with SCPPA for 4.9% of SCPPA’s share of Palo Verde Nuclear Generating Station (Palo Verde) shall be eligible as Qualifying Capacity. The power is scheduled as an import generally at Westwing Substation through the CAISO’s entitlement of transmission from Westwing to SP-15. 3. Boulder Canyon. Contract NO 16-DSR-12650 between United States Department of Energy Western Area Power Administration Boulder Canyon Project and City of Vernon, California for Electric Service shall be eligible to count as Qualifying Capacity. The power is scheduled as an import at Mead Substation generally through the CAISO’s entitlement of transmission from Mead Substation to SP-15. The amount of Qualifying Capacity will be based on the most current schedule for the available capacity from the Boulder Canyon Project at the time of submittal of the Resource Adequacy Plan. 4. Vernon Units. Generating units and system units (excluding Vernon diesel generating units) within Vernon’s MSS, including the Malburg Generating Station and the City owned H. Gonzalez units, as reflected in Schedule 14 of Vernon’s MSS Agreement with CAISO shall be eligible to count as Qualifying Capacity. The amount of Qualifying Capacity of such units shall not exceed the Net Qualifying Capacity (NQC) as determined and listed annually by the CAISO. 5. Long Term Power Purchase Contracts. Long term power supply contracts (5 years or greater) entered through a power purchase agreement shall be eligible to count as Qualifying Capacity. The amount of Qualifying Capacity will be based on the City of Vernon’s percentage share of the Net Qualifying Capacity of each contract. For the upcoming year, the following contracts will count as Qualifying Capacity, Antelope Resolution No. 2022-35 Page 9 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 7 DSR 1 Solar Project, Astoria 2 Solar Project and Puente Hills Landfill Gas-To-Energy Facility. 6. Other Units. All other capacity from a Participating Generator, a System Unit, or a System Resource, as defined in the CAISO Tariff, shall be eligible as Qualifying Capacity. System Resources, however, must be located in the CAISO control area or have a firm transmission path from source to the CAISO control area. Such criteria for firm transmission facilities over the CAISO control area can be satisfied with the possession of a firm transmission right from the CAISO on the path associated with the System Resource. Firm transmission rights provide physical priority right to schedule over congested paths. 7. Interruptible Service Agreements. Interruptible Service Agreements with the City’s Electrical customers. Currently Vernon has an Interruptible Service Agreement where the customer agrees to interrupt up to 27 MW of load within a 30-minute notification. A period of interruption can occur upon notification from the Independent System Operator (ISO) requiring the City to shed load or upon the unscheduled outage of the Malburg Generating Station (MGS) or any other generating unit internal to the City’s system. Local Capacity Area Resources: In accordance with Section 40.3 of the CAISO Tariff, CAISO annually publishes a Local Capacity Technical Study that determines the amount of local capacity needed in the Los Angeles Basin area that must be available to the CAISO. Based on the Local Capacity Technical Study, the CAISO allocates responsibility for Local Capacity Area Resources to the Scheduling Coordinators of the LSEs. The CAISO validates that the Scheduling Coordinator list enough local resources in its Resource Adequacy data templates to satisfy its obligation. Staff has prepared the Resource Adequacy data templates (Exhibit 4) which lists the Resource Adequacy Resources including the Malburg Generating Station, Puente Hills Landfill Gas-To- Energy Facility and the City owned H. Gonzalez units that will be counted on to satisfy the Local Area Capacity requirement for the City of Vernon. Additionally, any Interruptible Service Agreements with the City’s electric customers shall count towards the City’s Local Capacity’s requirement. Resolution No. 2022-35 Page 10 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 8 Flexible Resource Adequacy Capacity: In accordance with Section 40.10 of the CAISO Tariff, CAISO annually conducts a study to determine the Flexible Capacity Need for the CAISO Balancing Authority Area for each month of the next calendar year and provides the results of the study to each Local Regulatory Authority in the CAISO Balancing Authority Area. Flexible resources are resources with the potential to ramp up and down quickly and have the capability to start and shut down multiple times per day. The need for flexible capacity is a result of the CAISO managing a “greener” grid. The increase of variable energy resources and distributed generation has presented significant challenges to grid reliability. These types of resources are projected to continue to increase in the future which will create an increase in supply and load variability and unpredictability within the CAISO system. In order for the CAISO to efficiently operate the grid, it needs measures to ensure that flexible resources are economically bid into the CAISO markets and as a result optimally dispatch them. The CAISO study calculates the total system amount of Flexible Capacity needed for each of the three Flexible Capacity categories: (1) Base ramping flexibility; (2) Peak ramping flexibility; and (3) Super-peak ramping flexibility. Section 40.10.3 of the CAISO Tariff sets the criteria needed by resources to qualify for each category. For the Calendar Year 2023, the CAISO has determined the system-wide Flexible Capacity needs and has notified each LSE their monthly requirement. Exhibit 6 lists the City’s Flexible Capacity requirement by month and category. Furthermore, the CAISO has established the Effective Flexible Capacity for each resource and the category of Flexible Capacity each resource will qualify for the upcoming compliance year. For Calendar Year 2023, the CAISO has established 99 MW of category 1 base ramping flexible resources adequacy capacity for Malburg Generating Station, and 5.75 MW category 1 base ramping flexible resource adequacy capacity for H. Gonzales Units (Exhibit 7). CAISO Tariff Section 40.10.5.1 requires the Scheduling Coordinators of LSEs to identify the resources it will rely on to satisfy its Flexible Resource Adequacy Capacity on both the annual and monthly Resource Adequacy data templates. Staff has prepared the Resource Adequacy data templates (Exhibit 4) which lists the Resource Adequacy Resources including the Malburg Generating Station and the City owned H. Resolution No. 2022-35 Page 11 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 9 Gonzalez units that will be counted on to satisfy the Flexible Resource Adequacy Capacity requirement for the City of Vernon. Annual and Monthly Resource Adequacy and Supply data: The CAISO Tariff requires that the scheduling coordinator of a load serving entity provide an annual and a monthly Resource Adequacy Plan (Section 40.2.2.4) using the required templates and submitted on the set schedules. Furthermore, the scheduling coordinator of a resource providing resource adequacy must submit both an annual and monthly Supply Plan (Section 40.4.7.1) using the required templates and submitted on the set schedules. Staff asks that City Council adopt the following two requirements for both the annual and monthly submittals: 1. Annual: submittals must demonstrate that 90% of the forecasted coincident peak demand plus planning reserves margin and flexible resource adequacy requirement has been secured; and 100% of the total local resource adequacy requirement has been secured. 2. Monthly: submittals must demonstrate 100% of the forecasted coincident peak Demand plus planning reserves margin, flexible resource adequacy requirement and local resource adequacy requirement has been met. Data on the monthly plans may be adjusted for seasonal variations in the City’s load or changes in its contracted/owned resources. Therefore, as required by the CAISO, the City of Vernon, as a load serving entity and a scheduling coordinator for resource adequacy resources, must submit a Resource Adequacy and Supply Plan on the set schedules. Staff has prepared the Annual Resource Adequacy (Exhibit 4) and Supply data (Exhibit 5) for calendar year 2023. Staff will submit the monthly Resource Adequacy and Supply data to the CAISO as they become due. The data to be submitted on the monthly plans will demonstrate that 100% of all requirements have been met and may be adjusted from the annual Resource Adequacy and Supply Plan for seasonal variations as well as load and resource changes. The monthly plan is due to the CAISO 45 days prior to the beginning of the month. Resolution No. 2022-35 Page 12 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Exhibit 1 Year Peak % Inc./Dec. (A)(B)(C) 1 2018 182.8 2 2019 177.2 -3.063% 3 2020 191.4 8.014% 4 2021 194.3 1.520% 5 2022 187.4 -3.582% 6 Average 186.6 0.7% A Year B Source: (City Historical Sytem Peak Load Data) C % Increase/Decrease from previous year. Note: The five year system peak demand average will not be used in this year's RA Plan. It has been determined that no load growth is appropriate for calendar 2023. 5 year Sytem Peak Demand Analysis Resolution No. 2022-35 Page 13 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Exhibit 2 Month Forecast based 2021-2022 (Actual City System Load) 2023 Projected System Peak Load (A)(B)(C) 1 January '22 169.62 169.62 2 February '22 174.42 174.42 3 March '22 173.45 173.45 4 April '22 183.82 183.82 5 May '22 176.02 176.02 6 June '22 184.44 184.44 7 July '22 183.34 183.34 8 August '22 187.35 187.35 9 September '21 189.41 189.41 10 October '21 180.56 180.56 11 November '21 182.44 182.44 12 December '21 173.15 173.15 A Month and Year B Source: (Forecasted Peak Based on Historical System Peak Load Data) C Projected Load for 2023 no load growth is applied) January - December 2023 Projected Load Resolution No. 2022-35 Page 14 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Exhibit 3 Month Vernon System Peak Demand Coincidental Peak Factor Coincident Peak Demand Forecast RA Capacity Requirement (A)(B)(C)(D)(E) 1 January 169.6 77.1%130.8 150.4 2 February 174.4 78.5%137.0 157.5 3 March 173.5 78.1%135.4 155.7 4 April 183.8 75.4%138.6 159.4 5 May 176.0 83.5%147.0 169.0 6 June 184.4 80.7%148.8 171.1 7 July 183.3 80.2%147.1 169.2 8 August 187.4 78.5%147.2 169.2 9 September 189.4 83.0%157.2 180.8 10 October 180.6 83.7%151.2 173.9 11 November 182.4 80.0%145.9 167.8 12 December 173.2 79.5%137.7 158.4 A Month B Source: (Exhibit 2 Column E) C Source: CEC D Product of B and C E Product of D and 115% (115% reflects Planning Reserve Margin) January - December 2023 Resource Adequacy Requirement Resolution No. 2022-35 Page 15 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Report Type Annual (Monthly/ Annual) Report Date 9/13/2022 (MM/DD/YYYY) Name of Load Serving Entity (LSE):City of Vernon (Text Field) Scheduling Coordinator (SCID):VERN (AAAA) Person who prepared this RA Plan (Name):Efrain Sandoval (Text Field) Title:Principal Resource Scheduler/Trader (Text Field) Primary Contact Name:Efrain Sandoval (Text Field) Title:Principal Resource Scheduler/Trader (Text Field) Address:4305 Santa Fe Ave.(Text Field) Address 2:(Optional, Text Field) City:Vernon (Text Field) State:CA (Text Field) Zip:90058 (Numeric) Telephone:(323) 826-1424 (Numeric) Email esandoval@ci.vernon.ca.us (Text Field) Back-Up Contact Name:Shawn Sharif (Text Field) Title:Principal Resource Scheduler/Trader (Text Field) Telephone:(323)826-3625 (Numeric) Email:ssharif@ci.vernon.ca.us (Text Field) Confidential RA Data 1 of 2 9/14/2022 Exhibit 4 Resolution No. 2022-35 Page 16 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Resource ID in CAISO Master File Local RA Capacity (MW 00.00 No Rounding) System RA Capacity (MW 00.00 No Rounding) Flexible RA Capacity (MW 00.00 No Rounding) Flex Category RA Capacity Effective Start Date (mm/dd/yyyy) RA Capacity Effective End Date (mm/dd/yyyy) VERNON 6 MALBRG 68 66 50 1 1/1/2023 1/31/2023 VERNON 6 MALBRG 68 66 66 1 2/1/2023 2/28/2023 VERNON 6 MALBRG 68 66 66 1 3/1/2023 3/31/2023 VERNON 6 MALBRG 68 66 63 1 4/1/2023 4/30/2023 VERNON 6 MALBRG 68 66 61 1 5/1/2023 5/31/2023 VERNON 6 MALBRG 68 66 61 1 6/1/2023 6/30/2023 VERNON 6 MALBRG 68 66 59 1 7/1/2023 7/31/2023 VERNON 6 MALBRG 68 66 61 1 8/1/2023 8/31/2023 VERNON 6 MALBRG 68 66 62 1 9/1/2023 9/30/2023 VERNON 6 MALBRG 68 66 65 1 10/1/2023 10/31/2023 VERNON 6 MALBRG 68 66 59 1 11/1/2023 11/30/2023 VERNON 6 MALBRG 68 66 51 1 12/1/2023 12/31/2023 VERNON 6 GONZL1 5.75 1/1/2023 1/31/2023 VERNON 6 GONZL1 5.75 2/1/2023 2/28/2023 VERNON 6 GONZL1 5.75 3/1/2023 3/31/2023 VERNON 6 GONZL1 5.75 4/1/2023 4/30/2023 VERNON 6 GONZL1 5.75 5/1/2023 5/31/2023 VERNON 6 GONZL1 5.75 6/1/2023 6/30/2023 VERNON 6 GONZL1 5.75 7/1/2023 7/31/2023 VERNON 6 GONZL1 5.75 8/1/2023 8/31/2023 VERNON 6 GONZL1 5.75 9/1/2023 9/30/2023 VERNON 6 GONZL1 5.75 10/1/2023 10/31/2023 VERNON 6 GONZL1 5.75 11/1/2023 11/30/2023 VERNON 6 GONZL1 5.75 12/1/2023 12/31/2023 VERNON 6 GONZL2 5.75 1/1/2023 1/31/2023 VERNON 6 GONZL2 5.75 2/1/2023 2/28/2023 VERNON 6 GONZL2 5.75 3/1/2023 3/31/2023 VERNON 6 GONZL2 5.75 4/1/2023 4/30/2023 VERNON 6 GONZL2 5.75 5/1/2023 5/31/2023 VERNON 6 GONZL2 5.75 6/1/2023 6/30/2023 VERNON 6 GONZL2 5.75 7/1/2023 7/31/2023 VERNON 6 GONZL2 5.75 8/1/2023 8/31/2023 VERNON 6 GONZL2 5.75 9/1/2023 9/30/2023 VERNON 6 GONZL2 5.75 10/1/2023 10/31/2023 VERNON 6 GONZL2 5.75 11/1/2023 11/30/2023 VERNON 6 GONZL2 5.75 12/1/2023 12/31/2023 VERN MEAD230 I UC IMS001 22 1/1/2023 1/31/2023 VERN MEAD230 I UC IMS001 22 2/1/2023 2/28/2023 VERN MEAD230 I UC IMS001 22 3/1/2023 3/31/2023 VERN MEAD230 I UC IMS001 22 4/1/2023 4/30/2023 VERN MEAD230 I UC IMS001 22 5/1/2023 5/31/2023 VERN MEAD230 I UC IMS001 22 6/1/2023 6/30/2023 VERN MEAD230 I UC IMS001 22 7/1/2023 7/31/2023 VERN MEAD230 I UC IMS001 22 8/1/2023 8/31/2023 VERN MEAD230 I UC IMS001 22 9/1/2023 9/30/2023 VERN MEAD230 I UC IMS001 22 10/1/2023 10/31/2023 VERN MEAD230 I UC IMS001 22 11/1/2023 11/30/2023 VERN MEAD230 I UC IMS001 22 12/1/2023 12/31/2023 VERN WESTWING500 I UC IMS001 11.59 1/1/2023 1/31/2023 VERN WESTWING500 I UC IMS001 11.59 2/1/2023 2/28/2023 VERN WESTWING500 I UC IMS001 11.59 3/1/2023 3/31/2023 VERN WESTWING500 I UC IMS001 11.59 4/1/2023 4/30/2023 VERN WESTWING500 I UC IMS001 11.59 5/1/2023 5/31/2023 VERN WESTWING500 I UC IMS001 11.59 6/1/2023 6/30/2023 VERN WESTWING500 I UC IMS001 11.59 7/1/2023 7/31/2023 VERN WESTWING500 I UC IMS001 11.59 8/1/2023 8/31/2023 VERN WESTWING500 I UC IMS001 11.59 9/1/2023 9/30/2023 VERN WESTWING500 I UC IMS001 11.59 10/1/2023 10/31/2023 VERN WESTWING500 I UC IMS001 11.59 11/1/2023 11/30/2023 VERN WESTWING500 I UC IMS001 11.59 12/1/2023 12/31/2023 WALNUT 6 HILLGEN 4.64 1/1/2023 1/31/2023 WALNUT 6 HILLGEN 4.6 2/1/2023 2/28/2023 WALNUT 6 HILLGEN 4.57 3/1/2023 3/31/2023 WALNUT 6 HILLGEN 2.11 4/1/2023 4/30/2023 WALNUT 6 HILLGEN 4.07 5/1/2023 5/31/2023 WALNUT 6 HILLGEN 4.46 6/1/2023 6/30/2023 WALNUT 6 HILLGEN 4.42 7/1/2023 7/31/2023 WALNUT 6 HILLGEN 4.39 8/1/2023 8/31/2023 WALNUT 6 HILLGEN 4.35 9/1/2023 9/30/2023 WALNUT 6 HILLGEN 4.32 10/1/2023 10/31/2023 WALNUT 6 HILLGEN 4.28 11/1/2023 11/30/2023 WALNUT 6 HILLGEN 4.25 12/1/2023 12/31/2023 ASTORA 2 SOLAR2 0.07 1/1/2023 1/31/2023 ASTORA 2 SOLAR2 0.42 2/1/2023 2/28/2023 ASTORA 2 SOLAR2 1.8 3/1/2023 3/31/2023 ASTORA 2 SOLAR2 5.75 4/1/2023 4/30/2023 ASTORA 2 SOLAR2 5.28 5/1/2023 5/31/2023 ASTORA 2 SOLAR2 7.75 6/1/2023 6/30/2023 ASTORA 2 SOLAR2 7.22 7/1/2023 7/31/2023 ASTORA 2 SOLAR2 7.1 8/1/2023 8/31/2023 ASTORA 2 SOLAR2 5.78 9/1/2023 9/30/2023 ASTORA 2 SOLAR2 5.09 10/1/2023 10/31/2023 ASTORA 2 SOLAR2 0.71 11/1/2023 11/30/2023 ASTORA 2 SOLAR2 0.61 12/1/2023 12/31/2023 BIGSKY 2 SOLAR7 0.1 1/1/2023 1/31/2023 BIGSKY 2 SOLAR7 0.75 2/1/2023 2/28/2023 BIGSKY 2 SOLAR7 0.87 3/1/2023 3/31/2023 BIGSKY 2 SOLAR7 1.1 4/1/2023 4/30/2023 BIGSKY 2 SOLAR7 1.6 5/1/2023 5/31/2023 BIGSKY 2 SOLAR7 3.28 6/1/2023 6/30/2023 BIGSKY 2 SOLAR7 3.6 7/1/2023 7/31/2023 BIGSKY 2 SOLAR7 3.1 8/1/2023 8/31/2023 BIGSKY 2 SOLAR7 2.77 9/1/2023 9/30/2023 BIGSKY 2 SOLAR7 1.85 10/1/2023 10/31/2023 BIGSKY 2 SOLAR7 1.43 11/1/2023 11/30/2023 BIGSKY 2 SOLAR7 0.87 12/1/2023 12/31/2023 Confidential RA Data 2 of 2 9/14/2022 Resolution No. 2022-35 Page 17 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Report Type Annual Report Date 9/23/2022 Name of Supplier:City of Vernon Scheduling Coordinator:VERN Person who prepared this RA Plan (Name):Efrain Sandoval (Text Field) Title:Principal Resource Scheduler/Trader (Text Field) Primary Contact Name:Efrain Sandoval (Text Field) Title:Principal Resource Scheduler/Trader (Text Field) Address:4305 Santa Fe Ave.(Text Field) Address 2:(Optional, Text Field) City:Vernon (Text Field) State:CA (Text Field) Zip:90058 (Numeric) Telephone:(323) 826-1424 (Numeric) Email esandoval@ci.vernon.ca.us (Text Field) Back-Up Contact Name:Shawn Sharif (Text Field) Title:Principal Resource Scheduler/Trader (Text Field) Telephone:(Numeric) Email:ssharif@ci.vernon.ca.us (Text Field) Confidential Supply Data 1 of 3 9/14/2022 Exhibit 5 Resolution No. 2022-35 Page 18 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Resource ID in CAISO Master File Local RA Capacity (MW 00.00 No Rounding) System RA Capacity (MW 00.00 No Rounding) Flexible RA Capacity (MW 00.00 No Rounding) Flexible Category 1,2,3 RA Capacity Effective Start Date (mm/dd/yyyy) RA Capacity Effective End Date (mm/dd/yyyy) SCID of Load Serving Entity VERNON_6_GONZL2 5.75 12/1/2023 12/31/2023 VERN VERN_MEAD230_I_UC_IMS001 22 1/1/2023 1/31/2023 VERN VERN_MEAD230_I_UC_IMS001 22 2/1/2023 2/28/2023 VERN VERN_MEAD230_I_UC_IMS001 22 3/1/2023 3/31/2023 VERN VERN_MEAD230_I_UC_IMS001 22 4/1/2023 4/30/2023 VERN VERN_MEAD230_I_UC_IMS001 22 5/1/2023 5/31/2023 VERN VERN_MEAD230_I_UC_IMS001 22 6/1/2023 6/30/2023 VERN VERN_MEAD230_I_UC_IMS001 22 7/1/2023 7/31/2023 VERN VERN_MEAD230_I_UC_IMS001 22 8/1/2023 8/31/2023 VERN VERN_MEAD230_I_UC_IMS001 22 9/1/2023 9/30/2023 VERN VERN_MEAD230_I_UC_IMS001 22 10/1/2023 10/31/2023 VERN VERN_MEAD230_I_UC_IMS001 22 11/1/2023 11/30/2023 VERN VERN_MEAD230_I_UC_IMS001 22 12/1/2023 12/31/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 1/1/2023 1/31/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 2/1/2023 2/28/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 3/1/2023 3/31/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 4/1/2023 4/30/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 5/1/2023 5/31/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 6/1/2023 6/30/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 7/1/2023 7/31/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 8/1/2023 8/31/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 9/1/2023 9/30/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 10/1/2023 10/31/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 11/1/2023 11/30/2023 VERN VERN_WESTWING500_I_UC_IMS001 11.59 12/1/2023 12/31/2023 VERN Confidential Supply Data 3 of 3 9/23/2021 Resolution No. 2022-35 Page 19 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Exhibit 6 Min. Base Flexibility Requirement Peak Flexibility Super Peak Flexibilty Total Flexible RA Requirement (A)(B)(C)(D)(E) 1 January 16.09 31.30 2.49 49.88 2 February 20.98 40.80 3.25 65.03 3 March 21.06 40.97 3.26 65.29 4 April 20.03 38.95 3.10 62.08 5 May 27.60 29.75 3.02 60.37 6 June 27.78 29.93 3.04 60.75 7 July 26.93 29.02 2.94 58.90 8 August 27.47 29.61 3.00 60.08 9 September 28.16 30.35 3.08 61.59 10 October 20.69 40.24 3.21 64.13 11 November 18.79 36.55 2.91 58.26 12 December 16.28 31.67 2.52 50.47 A Month B Requirement for Category 1 - Base Ramping Resources C Maximum allowed use of Category 2 - Peak Flexibility D Maximum allowed use of Category 3 - Super Peak Flexibility E Total Flexible RA Requirement for City of Vernon January - December 2023 Flexible RA Requirement Resolution No. 2022-35 Page 20 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55 Exhibit 7 Effective Flexible Capacity Flexible Capacity Category (A)(B)(C) 1 Malburg Generating Station 99 1 2 H.Gonzalez 2 5.75 1 3 H.Gonzalez 2 5.75 1 A Designated flexible resource B Designated Effective Flexible Capacity (Qualified Flexible Capacity by each Resource) C Designated Flexible Capacity Category January - December 2023 Effective Flexible Capacity Resolution No. 2022-35 Page 21 of 21 ________________________ DocuSign Envelope ID: 8FA11837-2F1F-4478-9816-AABEB08DDA55